National Library of Energy BETA

Sample records for action rbca regulations

  1. USING RISK-BASED CORRECTIVE ACTION (RBCA) TO ASSESS (THEORETICAL) CANCER DEATHS AVERTED COMPARED TO THE (REAL) COST OF ENVIRONMENTAL REMEDIATION

    SciTech Connect (OSTI)

    Miller, M. L.; Hylko, J. M.

    2002-02-25

    In 1978, on the basis of existing health studies at the time, the Uranium Mill Tailings Remedial Action (UMTRA) Project legislation was proposed that would authorize remedial action at inactive uranium processing sites and vicinity properties. The cost of the program to the Federal Government was expected to be $180 million. With the completion of this project, approximately 1300 theoretical cancer deaths were prevented in the next 100 years at a cost of $1.45 billion, based on the Fiscal Year 1998 Federal UMTRA budget. The individual site costs ranged from $0.2 million up to $18 billion spent per theoretical cancer death averted over the next 100 years. Resources required to sustain remediation activities such as this are subject to reduction over time, and are originally based on conservative assumptions that tend to overestimate risks to the general public. This evaluation used a process incorporating risk-based corrective action (RBCA); a three-tiered, decision-making process tailoring corrective action activities according to site-specific conditions and risks. If RBCA had been applied at the start of the UMTRA Project, and using a criterion of >1 excess cancer death prevented as justification to remediate the site, only 50% of the existing sites would have been remediated, yielding a cost savings of $303.6 million to the Federal Government and affected States, which share 10% of the cost. This cost savings equates to 21% of the overall project budget. In addition, only 22% of the vicinity properties had structural contamination contributing to elevated interior gamma exposure and radon levels. Focusing only on these particular properties could have saved an additional $269.3 million, yielding a total savings of $573 million; 40% of the overall project budget. As operational experience is acquired, including greater understanding of the radiological and nonradiological risks, decisions should be based on the RBCA process, rather than relying on conservative assumptions that tend to overestimate risks to the general public.

  2. Soils Project Risk-Based Corrective Action Evaluation Process with ROTC 1 and ROTC 2, Revision 0

    SciTech Connect (OSTI)

    Matthews, Patrick; Sloop, Christina

    2012-04-01

    This document formally defines and clarifies the NDEP-approved process the NNSA/NSO Soils Activity uses to fulfill the requirements of the FFACO and state regulations. This process is used to establish FALs in accordance with the risk-based corrective action (RBCA) process stipulated in Chapter 445 of the Nevada Administrative Code (NAC) as described in the ASTM International (ASTM) Method E1739-95 (NAC, 2008; ASTM, 1995). It is designed to provide a set of consistent standards for chemical and radiological corrective actions.

  3. Action

    National Nuclear Security Administration (NNSA)

    Register / Vol. 72, No. 39 1 Wednesday, February 28, 2007 /Notices 9037 - has requested this exemption in order to revise the October 1988 exemption to include additional combustibles such as the 480V Reactor Building Vent Boards lB, 2B, and 3B; small panels in Units 1, 2 and 3; and the one hour fire rated fire wrap (Thermo-lag) material for the 20- foot separation zones identified. Environmental Impacts of the Proposed Action The proposed action will not significantly increase the probability

  4. Soils RBCA Eval Process.book

    National Nuclear Security Administration (NNSA)

    within these craters would require personnel entering the craters to position drilling and excavation equipment. This would present significant logistical concerns and...

  5. Addendum to the Closure Report for Corrective Action Unit 403: Second Gas Station, Tonopah Test Range, Nevada, Revision 0

    SciTech Connect (OSTI)

    Grant Evenson

    2009-05-01

    This document constitutes an addendum to the Closure Report for Corrective Action Unit 403: Second Gas Station, Tonopah Test Range, Nevada, September 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: This page that refers the reader to the SIR document for additional information The cover, title, and signature pages of the SIR document The NDEP approval letter The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-004-0360, Underground Storage Tanks. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

  6. Addendum to the Closure Report for Corrective Action Unit 398: Area 25 Spill Sites, Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Lynn Kidman

    2008-10-01

    This document constitutes an addendum to the April 2003, Closure Report for Corrective Action Unit 398: Area 25 Spill Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: This cover page that refers the reader to the UR Modification document for additional information The cover and signature pages of the UR Modification document The NDEP approval letter The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-25-17, Subsurface Hydraulic Oil Spill. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

  7. Addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada, Revision 1

    SciTech Connect (OSTI)

    Grant Evenson

    2009-05-01

    This document constitutes an addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada (Revision 1), December 2002 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: This page that refers the reader to the SIR document for additional information The cover, title, and signature pages of the SIR document The NDEP approval letter The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 06-25-01, CP-1 Heating Oil Release. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

  8. Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Grant Evenson

    2009-05-01

    This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: This page that refers the reader to the SIR document for additional information The cover, title, and signature pages of the SIR document The NDEP approval letter The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: 25-25-09, Spill H940825C (from UST 25-3101-1) 25-25-14, Spill H940314E (from UST 25-3102-3) 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

  9. Addendum 2 to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Grant Evenson

    2009-05-01

    This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: This page that refers the reader to the SIR document for additional information The cover, title, and signature pages of the SIR document The NDEP approval letter The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: 12-25-08, Spill H950524F (from UST 12-B-1) 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

  10. Addendum 2 to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada, Revison 0

    SciTech Connect (OSTI)

    Grant Evenson

    2009-05-01

    This document constitutes an addendum to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada, January 2004 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: This page that refers the reader to the SIR document for additional information The cover, title, and signature pages of the SIR document The NDEP approval letter The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 19-09-05, Mud Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

  11. Addendum to the Closure Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Discharge Area, Nevada Test Site, Revision 0

    SciTech Connect (OSTI)

    Grant Evenson

    2009-05-01

    This document constitutes an addendum to the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, December 1997 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-19-01, A12 Fleet Ops Steam Cleaning Efflu. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

  12. Revision of Army regulation (AR) 200-2, environmental effects of Army actions, and the application of total quality mangement (TQM) principles

    SciTech Connect (OSTI)

    Merkel, H,K.; Robitaille, P.

    1995-12-01

    AR 200-2 is the Army`s implementing regulation to the National Environmental Policy Act (NEPA) and DoD`s NEPA Directive DoDD 6050.1. AR 200-2 was last revised in the late 1980s and since then the scope of Army NEPA compliance activities have significantly increased, and NEPA practice and case law are continually changing. The purpose of revising AR 200-2 is to provide Army personel with clear and Concise guidance on how to meet their NEPA compliance requirements. The revision process included reviewing the current AR 200-2 to identify areas and topics needing clarification or modification; conferring with Army NEPA personnel to obtain views on NEPA compliance practices and procedures; conducting a review and analysis of significant, recent developments in NEPA case law; reviewing other federal NEPA implementing regulations to identify useful, transferrable concepts; preparing a {open_quotes}strawman{close_quotes} version of AR 200-2 to use as a starting point in the revision process; coordinating and consolidating input from the AR 200-2 Revisions Steering Committee; and responding to review comments. A draft version of AR 200-2 has been completed and informal Army-wide comments have been addressed. Some of the issues that the AR 200-2 Revisions Steering Committee considered during the revision effort included expanding the list of categorical exclusions, determining the appropriate length for the public comment period for environmental assessments prior to approval of the finding of no significant impact, determining the appropriate level of analysis for Army actions abroad, and determining whether Comprehensive Environmental Response Compensation Liability Act (CERCLA) or Resource Conservation and Recovery Act (RCRA) actions should be addressed under NEPA. Total Quality Management (TQM) principles were applied during the revision process. GroupSystems{trademark} software was used as a vehicle to enhance total group participation from managers to practitioners.

  13. Resources for Utility Regulators

    SciTech Connect (OSTI)

    SEE Action

    2012-06-01

    Provides a summary of State and Local Energy Efficiency Action Network (SEE Action) information resources available to utility regulators, organized by topic.

  14. RCRA corrective action and closure

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This information brief explains how RCRA corrective action and closure processes affect one another. It examines the similarities and differences between corrective action and closure, regulators` interests in RCRA facilities undergoing closure, and how the need to perform corrective action affects the closure of DOE`s permitted facilities and interim status facilities.

  15. Action Items

    Office of Environmental Management (EM)

    ACTION ITEMS Presentation to the DOE High Level Waste Corporate Board July 29, 2009 Kurt Gerdes Office of Waste Processing DOE-EM Office of Engineering & Technology 2 ACTION ITEMS...

  16. ACTION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    plan is to establish the overall plan for hazardous waste permitting, meeting closure and postclosure requirements, and remedial action under the Federal Resource Conservation ...

  17. Corrective Action

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Corrective Action Complete is demonstrated by one of the following: Eliminate Exposure (11 SMAs, 16 Sites) SMA SITE Submittal Date Document 2M-SMA-2.2 03-003(k) September...

  18. Mitigation Action Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  19. Defining the no action alternative for NEPA document of continuing actions

    SciTech Connect (OSTI)

    McCold, L.N.; Saulsbury, J.W.

    1995-12-01

    Environmental professionals today must address many issues that might not have been foreseen by developers of the National Environmental Policy Act of 1969 (NEPA) or the President`s Council on Environmental Quality (CEQ) regulations for implementing NEPA. One issue is the definition of the no action alternative for NEPA documentation of continuing actions. The CEQ regulations do not define the no action alternative, but merely state that NEPA analyses shall {open_quotes}include the alternative of no action{close_quotes}. For NEPA analyses of newly proposed actions, the practical definition of the no action alternative is clear (i.e., the agency will not implement the proposed action or alternative actions). However, the practical definition for NEPA analyses of continuing actions is not so clear. To clarify the definition of the no action alternative for continuing actions, particularly those that involve agency decisions about relicensing existing projects or continuing to operate existing programs or facilities. In trying to clarify the definition of the no action alternative for continuing actions, this paper examines the function of the no action alternative for NEPA analyses in general. Pertinent issues include how the definition of the no action alternative affects the selection of the baseline for environmental analysis and whether inclusion of the no action alternative really forces agencies to consider no action as a realistic alternative. To address these issues, this paper begins with a discussion of relevant legal decisions involving the no action alternative in NEPA analyses. The paper then examines some agency NEPA regulations and recent NEPA documents to provide examples of how some agencies address the no action alternative for continuing actions. Finally, the paper suggests definitions of the no action alternative for continuing actions and methods for addressing no action as a realistic alternative.

  20. Environmental Laws and Regulations | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Record Files Natural Resource Damage Assessments Environmental Laws and Regulations More Documents & Publications Paducah Public Involvement Plan Portsmouth Removal Actions...

  1. Defining the no-action alternative for National Environmental Policy Act analyses of continuing actions

    SciTech Connect (OSTI)

    McCold, L.N.; Saulsbury, J.W.

    1998-01-01

    The Council on Environmental Quality (CEQ) regulations for implementing the National Environmental Policy Act of 1969 (NEPA) do not define the no-action alternative, stating only that EPA analyses shall include the alternative of no action. The definition of the no-action alternative for newly proposed actions seems clear. However, for continuing actions, the meaning of the no-action alternative is ambiguous. This article examines the overall function of the no-action alternative for NEPA analyses of continuing actions. It begins with a discussion of the conflicting definitions of the no-action alternative for continuing activities, including CEQ regulations and guidelines related to the no-action alternative and legal decisions that have helped establish precedence for defining no action. A review of NEPA regulations and guidelines of 10 federal agencies shows how different agencies define no-action for continuing actions. Review of six recent NEPA documents on continuing actions reveals how their definition of the no-action alternative promote or impede informed decision-making.

  2. RCRA corrective action: Work plans

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This Information Brief describes the work plans that owners/operators may have to prepare in conjunction with the performance of corrective action for compliance with RCRA guidelines. In general, the more complicated the performance of corrective action appears from the remedial investigation and other analyses, the more likely it is that the regulator will impose work plan requirements. In any case, most owner/operators will prepare work plans in conjunction with the performance of corrective action processes as a matter of best engineering management practices.

  3. Title 25 CFR 2 Appeals from Administrative Actions | Open Energy...

    Open Energy Info (EERE)

    CFR 2 Appeals from Administrative Actions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 25 CFR 2 Appeals from...

  4. Building Actionable Climate Action Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Actionable Climate Action Plans Building Actionable Climate Action Plans Transcript PDF icon Presentation More Documents & Publications Partnering with Utilities Part 2: ...

  5. RCRA corrective action determination of no further action

    SciTech Connect (OSTI)

    1996-06-01

    On July 27, 1990, the U.S. Environmental Protection Agency (EPA) proposed a regulatory framework (55 FR 30798) for responding to releases of hazardous waste and hazardous constituents from solid waste management units (SWMUs) at facilities seeking permits or permitted under the Resource Conservation and Recovery Act (RCRA). The proposed rule, `Corrective Action for Solid Waste Management Units at Hazardous Waste Facilities`, would create a new Subpart S under the 40 CFR 264 regulations, and outlines requirements for conducting RCRA Facility Investigations, evaluating potential remedies, and selecting and implementing remedies (i.e., corrective measures) at RCRA facilities. EPA anticipates instances where releases or suspected releases of hazardous wastes or constituents from SWMUs identified in a RCRA Facility Assessment, and subsequently addressed as part of required RCRA Facility Investigations, will be found to be non-existent or non-threatening to human health or the environment. Such releases may require no further action. For such situations, EPA proposed a mechanism for making a determination that no further corrective action is needed. This mechanism is known as a Determination of No Further Action (DNFA) (55 FR 30875). This information Brief describes what a DNFA is and discusses the mechanism for making a DNFA. This is one of a series of Information Briefs on RCRA corrective action.

  6. Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order, Revision 0

    SciTech Connect (OSTI)

    Birney, Cathleen; Krauss, Mark J

    2013-09-01

    This document is part of an effort to reevaluate 37 FFACO and Administrative URs against the current Soils Risk-Based Corrective Action Evaluation Process. After reviewing 37 existing FFACO and Administrative URs, 3 URs addressed in this document have sufficient information to determine that these current URs may be removed, based on the RBCA criteria. This document presents recommendations on modifications to existing URs that will be consistent with the RBCA criteria.

  7. Recommendations and Justifications for Modifications To Downgrade Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order, Revision 1

    SciTech Connect (OSTI)

    Birney, Cathleen; Krauss, Mark J

    2013-10-01

    This document is part of an effort to reevaluate 37 FFACO and Administrative URs against the current Soils Risk-Based Corrective Action Evaluation Process. After reviewing 37 existing FFACO and Administrative URs, 11 URs addressed in this document have sufficient information to determine that these current URs may be downgraded to Administrative URs based on the RBCA criteria. This document presents recommendations on modifications to existing URs that will be consistent with the RBCA criteria.

  8. Corrective Actions Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community, Environment » Environmental Stewardship » Environmental Cleanup » Corrective Actions Corrective Actions Process The general process for evaluating and remediating potential release sites is called the corrective action process. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Corrective actions The Laboratory's corrective actions process refers to the way in which the Laboratory investigates, stabilizes,

  9. Civil Penalty Actions For Certification Violations Resolved | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Civil Penalty Actions For Certification Violations Resolved Civil Penalty Actions For Certification Violations Resolved May 6, 2010 - 12:39pm Addthis Today, the Department of Energy announced that it had resolved civil penalty actions against four showerhead manufacturers for having violated the Department's water conservation certification regulations. To resolve these actions Zoe Industries, Altmans Products LLC, EZ-FLO International, and Watermark Designs Ltd. have now certified

  10. 2014 Joint Action Workshop

    Broader source: Energy.gov [DOE]

    The Joint Action Workshop is an annual event for joint action agencies and their members to meet informally and discuss emerging policy, regulatory, and power supply issues, and other topics...

  11. Mitigation Action Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  12. Mitigation Action Plan

    Energy Savers [EERE]

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  13. Action Item Review and Status

    Office of Environmental Management (EM)

    Board Action Items Action Item Resolution Action Item Strategic Planning Initiative Optimization Study Resolution Presentation by S. Schneider (HLW System Integrated Project...

  14. RCRA corrective action program guide (Interim)

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The US Department of Energy (DOE) is responsible for compliance with an increasingly complex spectrum of environmental regulations. One of the most complex programs is the corrective action program proposed by the US Environmental Protection Agency (EPA) under the authority of the Resource Conservation and Recovery Act (RCRA) as amended by the Hazardous and Solid Waste Amendments (HSWA). The proposed regulations were published on July 27, 1990. The proposed Subpart S rule creates a comprehensive program for investigating and remediating releases of hazardous wastes and hazardous waste constituents from solid waste management units (SWMUs) at facilities permitted to treat, store, or dispose of hazardous wastes. This proposed rule directly impacts many DOE facilities which conduct such activities. This guidance document explains the entire RCRA Corrective Action process as outlined by the proposed Subpart S rule, and provides guidance intended to assist those persons responsible for implementing RCRA Corrective Action at DOE facilities.

  15. Action Plan - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agreement Action Plan Tri-Party Agreement The Agreement Action Plan Announcements List of Approved Changes TPA Project Manager's Lists Modifications for Public Comment Data Management MP-14 WIDS Information Hanford Site Waste Management Units Report Hanford Public Involvement Plan Administrative Record (AR) Related Links Action Plan Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Executive Summary 1.0 Introduction 1.1 Purpose 1.2 Regulatory Authorities 1.3

  16. Status of Corrective Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP AIB Report » Status of Corrective Actions Status of Corrective Actions at LANL Department of Energy Issues Accident Investigation Board (AIB) Report on February 14 Incident at the Waste Isolation Pilot Project in Carlsbad, New Mexico April 12, 2012 x x Contact Communication Office (505) 667-7000 Corrective Actions Undertaken by Los Alamos National Laboratory though a collaborative effort led by the Associate Director for Environmental Safety and Health (ADESH), the Associate Director for

  17. SEAB Climate Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    A presentation on the Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy.

  18. Climate Action Champions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Southeast Florida Regional Climate Compact 10 - Cities 4 - CountiesRegional Collaborative ... Technology transfer of smart grid advances to support the White House actions to respond ...

  19. Notes and Action Items

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rick Kendall, Tom Kitchens, Horst Simon SubCommittee on Visualization and Graphics Software Responsibility: JN Leboeuf, Judy Giarrusso, Steve Jardin, and Steve Lau Actions:...

  20. Remedial Action Performed

    Office of Legacy Management (LM)

    ... action, e.g., for inclusion in local land records. ... safety, and health, including requirements of DOE orders. ... petroleum and natural gas products that preexist in ...

  1. ARM - Status and Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status and Actions Campaign Details News Field Participants Resources Status and Actions ARM Data Discovery Browse Data Status and Actions For up-to-date campaign action, please see News 28.JUN.07 Requests for all field participants: Please place your preliminary data on the CHAPS ftp site no later than December. Connor Flynn has worked with ARM colleagues to give us a password protected FTP site. If you haven't received the instructions already from Connor regarding how to access the site,

  2. Protective Actions and Reentry

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    This volume defines appropriate protective actions and reentry of a site following an emergency. Canceled by DOE G 151.1-4.

  3. EIS-0460: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FutureGen 2.0 Project, Morgan County, Illinois This Mitigation Action Plan (MAP) briefly ... DOE prepared this MAP in accordance with 10 Code of Federal Regulations (CFR) 1021.331. ...

  4. WREP Mitigation Action Plan

    Energy Savers [EERE]

    Electrical Interconnection of the Whistling Ridge Energy Project 1 Mitigation Action Plan June 2015 Mitigation Action Plan for the Whistling Ridge Energy Project Measure Implementation Timeline Implementation Responsibility Earth (geology, soils, topography, and geologic hazards) Prior to Project construction, confirm subsurface soil and rock types and strength properties through a detailed geotechnical investigation of the specific locations of all wind Project elements, including wind

  5. Two Manufacturers Agree to Civil Penalties to Resolve Enforcement Actions |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Two Manufacturers Agree to Civil Penalties to Resolve Enforcement Actions Two Manufacturers Agree to Civil Penalties to Resolve Enforcement Actions February 15, 2011 - 5:30pm Addthis The Department of Energy today announced it has now settled two civil penalty actions against companies for violations of DOE regulations requiring that they certify products as compliant with federal efficiency standards. In the first case, DOE cited Perlick Residential & Hospitality

  6. National Environmental Policy Act (NEPA) Categorically Excluded Actions |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy NEPA » National Environmental Policy Act (NEPA) Categorically Excluded Actions National Environmental Policy Act (NEPA) Categorically Excluded Actions Categorical Exclusions (CX) - Categorical exclusions are categories of actions that DOE has determined, by regulation, do not individually or cumulatively have a significant effect on the human environment and for which neither an environmental assessment nor an environmental impact statement is typically required. Title

  7. A Chronological History of Federal Fleet Actions and Mandates

    SciTech Connect (OSTI)

    2011-04-22

    This chronological history of Federal fleet actions and mandates provides a year-by-year timeline of the acts, amendments, executive orders, and other regulations that affect Federal fleets. The fleet actions and mandates included in the timeline span from 1988 to 2009.

  8. Chronological History of Federal Fleet Actions and Mandates (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2011-04-01

    This chronological history of Federal fleet actions and mandates provides a year-by-year timeline of the acts, amendments, executive orders, and other regulations that affect Federal fleets. The fleet actions and mandates included in the timeline span from 1988 to 2009.

  9. Subtitle D: Groundwater monitoring and corrective action requirements

    SciTech Connect (OSTI)

    Ward, C.G.; McDaniel, L. )

    1993-01-01

    The newly promulgated Subtitle-D landfill regulations (40 CFR 258) require that landfill owners and operators adhere to certain design or performance standards for the location, design, operation and closure of municipal solid waste landfill facilities. This paper addresses the groundwater monitoring requirements and corrective action requirements of those regulations. The section of the regulations addressing groundwater monitoring and corrective action, Subpart-E, is the most comprehensive section of the regulations. As with other parts of the regulation, Subpart-E also contains inherent flexibility. This paper addresses the compliance schedules, exemptions to Subpart-E, and groundwater monitoring systems which include: background determination, multi-unit systems, hydrogeologic investigations, and monitoring well installation. The paper further addresses sampling and analysis requirements for detection and assessment monitoring, and the requirements for corrective action such as remedy assessment, selection, and implementation.

  10. Status of Corrective Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report on February 14 Incident at the Waste Isolation Pilot Project in Carlsbad, New Mexico April 12, 2012 x x Contact Communication Office (505) 667-7000 Corrective Actions...

  11. Notices ACTION: Notice.

    Office of Environmental Management (EM)

    8867 Federal Register Vol. 80, No. 215 Friday, November 6, 2015 Notices ACTION: Notice. SUMMARY: This notice announces EPA's receipt of an application 91163-EUP-R from Texas...

  12. Notices ACTION: Notice.

    Energy Savers [EERE]

    867 Federal Register Vol. 80, No. 215 Friday, November 6, 2015 Notices ACTION: Notice. SUMMARY: This notice announces EPA's receipt of an application 91163-EUP-R from Texas...

  13. Climate Action Champion: Technical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    betterbuildings Climate Action Champion: Technical Assistance to the City of Seattle Planning for Seattle's new Building Energy Code Overview The City of Seattle, identified as a Climate Action Champion (CAC) by the Department of Energy (DOE), is revising its 2012 Energy Code, already one of the most progressive in the country. Seattle has made a pledge to be carbon neutral by 2050. Seattle received technical assistance from the Pacific Northwest National Laboratory in order to develop a

  14. Corrective Action Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-03-02

    This Guide was developed to assist the Department of Energy (DOE) organizations and contractors in the development, implementation, and followup of corrective action programs utilizing the feedback and improvement core safety function within DOE's Integrated Safety Management System. This Guide outlines some of the basic principles, concepts, and lessons learned that DOE managers and contractors might consider when implementing corrective action programs based on their specific needs. Canceled by DOE G 414.1-2B. Does not cancel other directives.

  15. Regulations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Center Regulations Regulations Personnel Security Regulations Click Here FOIA Regulations Click Here Privacy Act Regulations Click Here Whistleblower Protection ...

  16. EO 13211: Regulations That Significantly Affect Energy Supply...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive Order 13211 of May 18, 2001 Actions Concerning Regulations That Significantly ... present the related submission under Executive Order 12866 of September 30, 1993, or ...

  17. Title 40 CFR 1502.14 Alternatives Including the Proposed Action...

    Open Energy Info (EERE)

    .14 Alternatives Including the Proposed Action Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR...

  18. Title 32 CFR 651 Environmental Analysis of Army Actions (AR 200...

    Open Energy Info (EERE)

    of Army Actions (AR 200-2) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 32 CFR 651...

  19. Title 40 CFR 1506.1 Limitations On Actions During NEPA Process...

    Open Energy Info (EERE)

    .1 Limitations On Actions During NEPA Process Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR...

  20. VOLTAGE REGULATOR

    DOE Patents [OSTI]

    Von Eschen, R.L.; Scheele, P.F.

    1962-04-24

    A transistorized voltage regulator which provides very close voitage regulation up to about 180 deg F is described. A diode in the positive line provides a constant voltage drop from the input to a regulating transistor emitter. An amplifier is coupled to the positive line through a resistor and is connected between a difference circuit and the regulating transistor base which is negative due to the difference in voltage drop across thc diode and the resistor so that a change in the regulator output causes the amplifier to increase or decrease the base voltage and current and incrcase or decrease the transistor impedance to return the regulator output to normal. (AEC)

  1. ES H action plan

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  2. EIS-0472: Mitigation Action Plan

    Broader source: Energy.gov [DOE]

    Uranium Leasing Program Mitigation Action Plan for the Final Uranium Leasing Program Programmatic Environmental Impact Statement

  3. Appendix VI Corrective Action Strategy

    National Nuclear Security Administration (NNSA)

    ......... 15 3.0 Underground Test Area............ 13 3-1 Underground Test Area Corrective Action ...

  4. Environmental Assessment - Proposed Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    availability of Waste Isolation Pilot Plant (WIPP) facilities and infrastructure to scientists who wish to conduct experiments there. DOE would allow these experiments if they can be conducted without interfering with the WIPP's primary transuranic waste disposal mission and if they reflect contemporary budget priorities. This fact sheet presents questions and answers about the proposed action and its alternative. The deep geologic repository at the WIPP could provide a favorable environment for

  5. Interim Action Determination

    Energy Savers [EERE]

    Interim Action Determination Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site The Department of Energy (DOE) is preparing the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS, DOE/EIS-0283-S2). DOE is evaluating alternatives for disposition of non-pit plutonium that is surplus to the national security needs of the United States. Although the Deputy Secretary of Energy approved Critical

  6. Description of Proposed Action

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RECORD OF CATEGORICAL EXCLUSION DETERMINATION 1 Description of Proposed Action Performance of a three-dimensional seismic survey line on approximately 2,409 acres contained within the WIPP Land Withdrawal Area as part of a larger survey to determine whether hydrocarbons are present in the region in quantities that warrant extraction and development. Number and Title of Applicable Categorical Exclusion B3.1 Site Characterization/Environmental Monitoring Activities covered by this Categorical

  7. February 2007 Standards Actions

    Energy Savers [EERE]

    DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 01-26-2007 Activity

  8. April 2008 Standards Actions

    Energy Savers [EERE]

    Apps for Vehicles Challenge Finalists Announced Apps for Vehicles Challenge Finalists Announced February 5, 2013 - 12:14pm Addthis Apps for Vehicles Finalists Apps for Vehicles Finalists Ian Kalin Director of the Energy Data Initiative What does this project do? The Apps for Vehicles competition challenges entrepreneurs to use vehicle open data to make cars and drivers safer and more efficient. American innovators have once again responded to a national call to action. Nearly 40 teams submitted

  9. August 2006 Standards Actions

    Energy Savers [EERE]

    DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 07-26-2006 Activity Summary In Conversion - 4 In

  10. Overview of the State and Local Energy Efficiency Action Network

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEE Action Update for the State and Local Energy Advisory Board Johanna Zetterberg SEE Action Network Coordinator March 12, 2013 www.seeaction.energy.gov * Executive Group met Jan 30 th (Washington DC) to review Working Group plans for this year * New guidance documents were published - Energy Efficiency Program Impact Evaluation Guide - Guide for Regulators on Data Access and Privacy - Guide to the Successful Implementation of State Combined Heat and Power (CHP) Policies * New events were held

  11. Acquisition Regulation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... for DOE until such time as the DOE Acquisition Regulation (DEAR) is amended to ... 2015. The clause provides the necessary language to require M&O contractors (to include ...

  12. 3RS action plan

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  13. Notices ACTION: Notice.

    Energy Savers [EERE]

    867 Federal Register / Vol. 80, No. 215 / Friday, November 6, 2015 / Notices ACTION: Notice. SUMMARY: This notice announces EPA's receipt of an application 91163-EUP-R from Texas Corn Producers Board requesting an experimental use permit (EUP) for the Aspergillus flavus strains TC16F, TC35C, TC38B, and TC46G. The Agency has determined that the permit may be of regional and national significance. Therefore, because of the potential significance, EPA is seeking comments on this application. DATES:

  14. Climate Action Tracker | Open Energy Information

    Open Energy Info (EERE)

    References: Climate Action Tracker1 "This "Climate Action Tracker" is an independent science-based assessment, which tracks the emission commitments and actions of countries. The...

  15. Emergencies and Emergency Actions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Emergency Actions Emergencies and Emergency Actions Selected documents on the topic of Emergencies and Emergency Actions under NEPA. May 12, 2010 Memorandum for Heads of...

  16. Guam Energy Action Plan

    SciTech Connect (OSTI)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  17. Natural Gas: Major Legislative and Regulatory Actions (1935 - 2008)

    Reports and Publications (EIA)

    2009-01-01

    This special report Web-based product presents a chronology of some of the key federal legislative and regulatory actions that have helped shape the natural gas market, with particular emphasis on policy directives from 1978 to October 2008. Separate reports provide brief descriptions of specific legislation, regulations, or policies, and their impacts on the natural gas market.

  18. International Program Action Table - October 2012 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Communication & Engagement International Programs International Program Action Table - October 2012 International Program Action Table - October 2012 International Program ...

  19. Energy Department Announces New Energy Efficiency Financing Publication Available through SEE Action Network

    Broader source: Energy.gov [DOE]

    The State and Local Energy Efficiency Action Network (SEE Action), a state- and local-led effort facilitated by the U.S. Department of Energy and the U.S. Environmental Protection Agency to achieve all cost effective energy efficiency, recently published a new report that provides an overview of the current state of on-bill lending programs with actionable insights for consideration by state policymakers, utility regulators and program administrators.

  20. Enforcement actions: Significant actions resolved individual actions. Semiannual progress report, January 1996--June 1996

    SciTech Connect (OSTI)

    1996-08-01

    This document summarizes significant enforcement actions that have been resolved during the period of January-June 1996. The report includes copies of Orders and Notices of Violations sent by the Nuclear Regulatory Commission to individuals with respect to the enforcement actions.

  1. Method for triggering an action

    DOE Patents [OSTI]

    Hall, David R.; Bartholomew, David B.; Johnson, Monte L.; Moon, Justin; Koehler, Roger O.

    2006-10-17

    A method for triggering an action of at least one downhole device on a downhole network integrated into a downhole tool string synchronized to an event comprises determining latency, sending a latency adjusted signal, and performing the action. The latency is determined between a control device and the at least one downhole device. The latency adjusted signal for triggering an action is sent to the downhole device. The action is performed downhole synchronized to the event. A preferred method for determining latency comprises the steps: a control device sends a first signal to the downhole device; after receiving the signal, the downhole device sends a response signal to the control device; and the control device analyzes the time from sending the signal to receiving the response signal.

  2. ICDF Complex Remedial Action Report

    SciTech Connect (OSTI)

    W. M. Heileson

    2007-09-26

    This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

  3. Complexity, action, and black holes

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Brown, Adam R.; Roberts, Daniel A.; Susskind, Leonard; Swingle, Brian; Zhao, Ying

    2016-04-18

    In an earlier paper "Complexity Equals Action" we conjectured that the quantum computational complexity of a holographic state is given by the classical action of a region in the bulk (the `Wheeler-DeWitt' patch). We provide calculations for the results quoted in that paper, explain how it fits into a broader (tensor) network of ideas, and elaborate on the hypothesis that black holes are the fastest computers in nature.

  4. Regulations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulations Regulations Security Reviews Click Here FOIA Appeals Click Here Whistleblower Protection Click Here Procedural Regulations Click Here Browse Title 10 Energy Click Here

  5. Enforcement actions: Significant actions resolved individuals actions. Semiannual progress report, July--December 1996

    SciTech Connect (OSTI)

    1997-04-01

    This compilation summarizes significant enforcement actions that have been resolved during the period (July - December 1996) and includes copies of Orders and Notices of Violation sent by the Nuclear Regulatory Commission to individuals with respect to-these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

  6. Enforcement actions: Significant actions resolved individual actions. Semiannual progress report, January 1997--June 1997

    SciTech Connect (OSTI)

    1997-09-01

    This compilation summarizes significant enforcement actions that have been resolved during the period (January - June 1997) and includes copies of Orders and Notices of Violation sent by the Nuclear Regulatory Commission to individuals with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

  7. Climate Action Champions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Initiatives » Climate Action Champions Climate Action Champions Climate Action Champions The White House launched the Climate Action Champions (CAC) Initiative in December 2014 with the U.S. Department of Energy (DOE) as lead Agency and, expanded the initiative in December 2015 through a strategic partnership with the Corporation for National Community Service (CNCS). PROGRAM POLICY OBJECTIVES The Climate Action Champions Initiative supports local and tribal government climate actions by:

  8. Part 3: Removal Action | Department of Energy

    Office of Environmental Management (EM)

    3: Removal Action Part 3: Removal Action Question: When may removal actions be initiated? Answer: Removal actions may be initiated when DOE determines that the action will prevent, minimize, stabilize, or eliminate a risk to health or the environment. The NCP specifies that the determination that a risk to health or the environment is appropriate for removal action should be based on: actual or potential exposure of humans, animals, or the food chain the presence of contained hazardous

  9. Charge regulation circuit

    DOE Patents [OSTI]

    Ball, Don G. (Livermore, CA)

    1992-01-01

    A charge regulation circuit provides regulation of an unregulated voltage supply in the range of 0.01%. The charge regulation circuit is utilized in a preferred embodiment in providing regulated voltage for controlling the operation of a laser.

  10. Energy Action Month October 2013 Poster

    Broader source: Energy.gov [DOE]

    Poster for Federal Energy Management Program (FEMP) features slogan "Take Action Now: Empower a Secure Energy Future" for October 2013 Energy Action Month.

  11. Climate Protection Action Fund | Open Energy Information

    Open Energy Info (EERE)

    Repower America Retrieved from "http:en.openei.orgwindex.php?titleClimateProtectionActionFund&oldid767417" Categories: Organizations Political Action Committees Policy...

  12. Inter Action Corp | Open Energy Information

    Open Energy Info (EERE)

    Action Corp Jump to: navigation, search Name: Inter Action Corp Place: Kanagawa, Japan Zip: 236-0004 Product: Semiconductor equipment and testing devices maker building a PV...

  13. Ecology Action: Small Market Advanced Retrofit Transformation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ecology Action: Small Market Advanced Retrofit Transformation Program (SMART) Lead Performer: Ecology Action - Santa Cruz, CA Partners: - New Buildings Institute - Portland, OR - ...

  14. Energy Agency Coordinators for Energy Action Month

    Broader source: Energy.gov [DOE]

    Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

  15. EAC Recommendations for DOE Action Regarding Interconnection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection-Wide Planning - June 6, 2013 EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 EAC Recommendations for DOE Action Regarding ...

  16. Climate Action Plan | OpenEI Community

    Open Energy Info (EERE)

    actions that the administration believes will mitigate the environmental and economic costs of climate change. Obama's six Climate Action Initiatives: 1. Phasing out Fossil Fuels...

  17. California Climate Action Registry | Open Energy Information

    Open Energy Info (EERE)

    Climate Action Registry Jump to: navigation, search Name: California Climate Action Registry Place: Los Angeles, California Zip: 90014 Product: Los Angeles-based NPO which develops...

  18. Renewable Energy Action Project | Open Energy Information

    Open Energy Info (EERE)

    Action Project Jump to: navigation, search Name: Renewable Energy Action Project Place: San Francisco, California Zip: 94107 Product: REAP is a San Francisco-based non-profit...

  19. Presidential Climate Action Project | Open Energy Information

    Open Energy Info (EERE)

    Page Edit with form History Presidential Climate Action Project Jump to: navigation, search Name: Presidential Climate Action Project Place: Denver, Colorado Zip: 80217-3364...

  20. Florida state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1981-02-27

    This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  1. Iowa state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1981-02-09

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  2. Maryland State information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  3. Oregon state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  4. Oregon state information handbook formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  5. Massachusetts state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  6. Pennsylvania state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  7. Corrective Action Decision Document for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Mark Krause

    2010-08-01

    This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): 02-26-11, Lead Shot 02-44-02, Paint Spills and French Drain 02-59-01, Septic System 02-60-01, Concrete Drain 02-60-02, French Drain 02-60-03, Steam Cleaning Drain 02-60-04, French Drain 02-60-05, French Drain 02-60-06, French Drain 02-60-07, French Drain 23-60-01, Mud Trap Drain and Outfall 23-99-06, Grease Trap 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: Determine whether COCs are present. If COCs are present, determine their nature and extent. Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus corrective action is required. Assessment of the data generated from investigation activities conducted at CAU 562 is shown in Table ES-1. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 13 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 562. No further action is the preferred corrective action for CASs 02-60-01, 02-60-06, and 02-60-07. Clean closure is the preferred corrective action for CASs 02-26-11, 02-44-02, 02-59-01, 02-60-02, 02-60-03, 02-60-04, 02-60-05, 23-60-01, 23-99-06, and 25-60-04. The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposures to contaminated media to acceptable levels. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: No further corrective action is required at CASs 02-60-01, 02-60-06, and 02-60-07. Clean closure is recommended for the remaining 10 CASs in CAU 562. A Corrective Action Plan will be submitted to the Nevada Division of Environmental Protection that contains a detailed description of the proposed actions that will be taken to implement the selected corrective actions.

  8. Missouri State information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations.

  9. Texas Solar Collaboration Action Plan

    SciTech Connect (OSTI)

    Winland, Chris

    2013-02-14

    Texas Solar Collaboration Permitting and Interconenction Process Improvement Action Plan. San Antonio-specific; Investigate feasibility of using electronic signatures; Investigate feasibility of enabling other online permitting processes (e.g., commercial); Assess need for future document management and workflow/notification IT improvements; Update Information Bulletin 153 regarding City requirements and processes for PV; Educate contractors and public on CPS Energy’s new 2013 solar program processes; Continue to discuss “downtown grid” interconnection issues and identify potential solutions; Consider renaming Distributed Energy Resources (DER); and Continue to participate in collaborative actions.

  10. Corrective Action Decision Document/Closure Report for Corrective Action Unit 567: Miscellaneous Soil Sites Nevada National Security Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Matthews, Patrick

    2014-12-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 567 based on the implementation of the corrective actions. The corrective actions implemented at CAU 567 were developed based on an evaluation of analytical data from the CAI, the assumed presence of COCs at specific locations, and the detailed and comparative analysis of the CAAs. The CAAs were selected on technical merit focusing on performance, reliability, feasibility, safety, and cost. The implemented corrective actions meet all requirements for the technical components evaluated. The CAAs meet all applicable federal and state regulations for closure of the site. Based on the implementation of these corrective actions, the DOE, National Nuclear Security Administration Nevada Field Office provides the following recommendations: • No further corrective actions are necessary for CAU 567. • The Nevada Division of Environmental Protection issue a Notice of Completion to the DOE, National Nuclear Security Administration Nevada Field Office for closure of CAU 567. • CAU 567 be moved from Appendix III to Appendix IV of the FFACO.

  11. Guidance Regarding Actions That May Proceed During the NEPA Process...

    Office of Environmental Management (EM)

    Actions That May Proceed During the NEPA Process: Interim Actions Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions DOE guidance to provide...

  12. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

    1982-09-01

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

  13. Regulators, Requirements, Statutes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regulators, Requirements, Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Environmental laws and regulations LANL complies with more than 30 state and federal regulations and policies designed to protect human health and the environment. Regulators Regulators Environmental

  14. POST-REMEDIAL ACTION REPORT

    Office of Legacy Management (LM)

    POST-REMEDIAL ACTION REPORT . FORTHE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA SEPTEMBER 1995 Prepared for United States' Department of Energy Oak Ridge Operations Office Under Contract No. DE-ACQ5-910R2 1949 Gchtel National, 1nc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . r FIGURES iv . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  15. Action Sheet 36 Final Report

    SciTech Connect (OSTI)

    Kips, R E; Kristo, M J; Hutcheon, I D

    2012-02-24

    Pursuant to the Arrangement between the European Commission DG Joint Research Centre (EC-JRC) and the Department of Energy (DOE) to continue cooperation on research, development, testing, and evaluation of technology, equipment, and procedures in order to improve nuclear material control, accountancy, verification, physical protection, and advanced containment and surveillance technologies for international safeguards, dated 1 September 2008, the IRMM and LLNL established cooperation in a program on the Study of Chemical Changes in Uranium Oxyfluoride Particles under IRMM-LLNL Action Sheet 36. The work under this action sheet had 2 objectives: (1) Achieve a better understanding of the loss of fluorine in UO{sub 2}F{sub 2} particles after exposure to certain environmental conditions; and (2) Provide feedback to the EC-JRC on sample reproducibility and characteristics.

  16. Take the Energy Action Challenge

    K-12 Energy Lesson Plans and Activities Web site (EERE)

    Students will work in pairs or small groups to apply knowledge of energy-wise habits to evaluate energy use in their homes and schools and make recommendations for improved efficiency. They will use an energy audit tool to collect data on their home and school energy habits and present an action plan to their class. Further communication at the school and district level is encouraged.

  17. MITIGATION ACTION PLAN FOR THE PLAINS & EASTERN CLEAN LINE TRANSMISSION PROJECT

    Energy Savers [EERE]

    MITIGATION ACTION PLAN FOR THE PLAINS & EASTERN CLEAN LINE TRANSMISSION PROJECT DOE/EIS-0486 MARCH 2016 3 1 INTRODUCTION The U.S. Department of Energy (DOE) National Environmental Policy Act (NEPA) Implementing Procedures (Title 10 Code of Federal Regulations [CFR] 1021.331) require completion of a mitigation action plan (MAP) following each Environmental Impact Statement (EIS) and its associated Record of Decision (ROD) to address mitigation commitments expressed in the ROD. The DOE Notice

  18. City of Boulder- Climate Action Plan Fund

    Broader source: Energy.gov [DOE]

    Note: As of 2015, the Climate Action Plan is now referred to as the Climate Commitment. In November 2015, Boulder voters approved an extension of the  Climate Action Plan tax through 2020, with...

  19. Multimedia regulated chemicals

    SciTech Connect (OSTI)

    Lee, C.C.; Huffman, G.L.; Mao, Y.L.

    1999-10-01

    This article examines those chemicals that are listed in either environmental laws or regulations. Its objective is to help readers determine which laws regulate what types of chemicals and which types of chemicals are regulated by what laws. It is multimedia in scope, describing the various chemicals that are regulated in the different media (i.e., air, water, or land).

  20. State action in regional transmission groups

    SciTech Connect (OSTI)

    Rokach, J.Z.

    1994-12-01

    States should participate in coordinated transmission planning through regional transmission groups, while reserving their right to pass upon transmission planning. This would smooth an otherwise difficult transition, as FERC and state regulators seek to facilitate a competitive bulk power market that ignores arbitrary jurisdiction lines. Since the Federal Energy Regulatory Commission issued its Policy Statement on Regional Transmission Groups, two RTG`s, the Western Regional Transmission Association and the Southwest Regional Transmission Association, have gained conditional approval from FERC. A third, the Northwest Regional Transmission Association, files its governing agreement with the Commission, seeking FERC`s approval. Price setting within RTGs and information exchanges involved in planning the grid raise questions of the legality of these collective actions under the antitrust laws. All three agreements allow for exchanges of commercial and planning information, but, conspicuously, do not set transmission prices. For the moment, therefore, antitrust liability for RTGs would arise out of the information exchanges involved in planning the grid. In addition, with FERC pushing for `restructuring` at the wholesale level through open access and the states becoming aggressive in trying to institute competition at the consumer level through retail wheeling, issues of federal-state jurisdiction in transmission have come to the fore.

  1. Energy Action Month | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Action Month Energy Action Month Energy Action Month Lead our nation to a secure, clean, and prosperous energy future As proclaimed by President Obama, October marks Energy Action Month. With the March announcement of Executive Order 13693: Planning for Federal Sustainability in the Next Decade, the federal government faces even more challenging goals to reduce energy consumption. Agencies are committed to stepping up and adopting more sustainable operations to cut greenhouse gas

  2. Climate Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Climate Action Plan Climate Action Plan Since President Obama's announcement of the Climate Action Plan (CAP) on June 25, 2013, the Department of Energy (DOE) has moved forward to lead initiatives and support interagency efforts that cut carbon pollution, augment resilience and preparedness in the face of climate impacts, and strengthen international partnerships addressing the issue. This effort involves activities all across the Department, including actions led by the Office of International

  3. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    II Environmental Management Headquarters Corrective Action Plan - Radiological Release ... for addressing Office of Environmental Management (EM) Headquarters (HQ) issues ...

  4. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    I Environmental Management Headquarters Corrective Action Plan - Radiological Release ... for addressing Office of Environmental Management (EM) Headquarters (HQ) issues ...

  5. SEE Action Series: Strategic Energy Management

    Broader source: Energy.gov [DOE]

    A presentation on Strategic Energy Management from a webinar hosted by the Existing Commercial Buildings Working Group at SEE Action.

  6. NREL: Technology Deployment - Climate Action Planning Tool

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home Technology Deployment Climate Action Planning Tool Technology Deployment - Climate Action Planning Tool NREL's Climate Action Planning Tool provides a quick, basic estimate of how various technology options can contribute to an overall climate action plan for your research campus. Use the tool to identify which options will lead to the most significant reductions in consumption of fossil fuels and in turn meet greenhouse gas reduction goals. Follow these four steps: Gather baseline energy

  7. EIS-0380: Mitigation Action Plan Annual Report

    Broader source: Energy.gov [DOE]

    Los Alamos National Laboratory Site-Wide Environmental Impact Statement Fiscal Year 2012 Mitigation Action Plan Annual Report

  8. Energy Action Month October 2014 Campaign Materials

    Broader source: Energy.gov [DOE]

    Campaign materials for "Transition to a Clean Energy Reality," the theme for Energy Action Month October 2014.

  9. Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions

    Broader source: Energy.gov [DOE]

    DOE guidance to provide assistance in determining whether an action within the scope of an EIS may be taken before a record of decision is issued. The guidance reviews applicable requirements, gives examples of the types of actions that may proceed as interim actions, describes case studies, and outlines the steps in the EIS process for interim actions.

  10. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    SciTech Connect (OSTI)

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  11. Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography

    SciTech Connect (OSTI)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1985-09-01

    This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.

  12. EIS-0397: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EIS-0397: Mitigation Action Plan Lyle Falls Fish Passage Project This Mitigation Action Plan identifies measures that are intended to avoid, reduce, or...

  13. PIA - Correspondence and Action Tracking System (CATS) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Correspondence and Action Tracking System (CATS) PIA - Correspondence and Action Tracking System (CATS) PIA - Correspondence and Action Tracking System (CATS) PDF icon PIA - ...

  14. China-Partnership for Climate Action | Open Energy Information

    Open Energy Info (EERE)

    Partnership for Climate Action (Redirected from Partnership for Climate Action - China) Jump to: navigation, search Name Partnership for Climate Action - China AgencyCompany...

  15. Earned Value Management System (EVMS) Corrective Action Standard...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EVMS) Corrective Action Standard Operating Procedure Earned Value Management System (EVMS) Corrective Action Standard Operating Procedure This EVMS Corrective Action Standard ...

  16. EA-1923: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EA-1923: Mitigation Action Plan Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This Mitgation Action Plan ...

  17. Historical impacts of environmental regulation of silver

    SciTech Connect (OSTI)

    Purcell, T.W.; Peters, J.J.

    1999-01-01

    Exposure to silver, and hence its possible environmental effects, has been regulated since the 1960s. Rules were first developed in the United States to protect against potential negative effects to humans due to ingestion of drinking water containing silver. As regulations for other environmental media were developed, silver was generally included because of its designation as a drinking water chemical of concern. Ambient water quality criteria were developed based on the toxic action of ionic silver. In the early 1990s the US Environmental Protection Agency`s Office of Drinking Water downgraded silver from a primary to a secondary maximum contaminant level because the effects of exposure to silver were judged to be cosmetic. Regulations pertaining to solid waste, surface waters, and occupational exposure have not been changed, but may be changed in the near future as the fate and toxic mechanisms of silver become better understood.

  18. Corrective Action Decision Document for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada (Rev. No.: 0, February 2001)

    SciTech Connect (OSTI)

    DOE /NV

    2001-02-23

    This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's selection of a recommended Corrective Action Alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 490, Station 44 Burn Area, Tonopah Test Range (TTR), Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 490 is located on the Nellis Air Force Range and the Tonopah Test Range and is approximately 140 miles northwest of Las Vegas, Nevada. This CAU is comprised of four Corrective Action Sites (CASs): 03-56-001-03BA, Fire Training Area (located southwest of Area 3); RG-56-001-RGBA, Station 44 Burn Area (located west of Main Lake); 03-58-001-03FN, Sandia Service Yard (located north of the northwest corner of Area 3); and 09-54-001-09L2, Gun Propellant Burn Area (located south of the Area 9 Compound on the TTR). A Corrective Action Investigation was performed in July and August 2000, and analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine contaminants of concern (COCs). There were no COCs identified in soil at the Gun Propellant Burn Area or the Station 44 Burn Area; therefore, there is no need for corrective actions at these two sites. Five soil samples at the Fire Training Area and seven at the Sandia Service Yard exceeded PALs for total petroleum hydrocarbons-diesel. Upon the identification of COCs specific to CAU 490, Corrective Action Objectives were developed based on a review of existing data, future use, and current operations at the TTR, with the following three CAAs under consideration: Alternative 1 - No Further Action, Alternative 2 - Closure In Place - No Further Action With Administrative Controls, and Alternative 3 - Clean Closure by Excavation and Disposal. These alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of this evaluation, the preferred choice for CAU 490 was Alternative 3. This alternative was judged to meet all requirements for the technical components evaluated, all applicable state and federal regulations for closure of the site, and will eliminate potential future exposure pathways to the contaminated soils at this site.

  19. Environmental Management Headquarters Corrective Action Plan - Radiological

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Release Phase I | Department of Energy I Environmental Management Headquarters Corrective Action Plan - Radiological Release Phase I The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Phase 1: Radiological Release Event at the Waste Isolation Pilot Plant (WIPP) on February 14, 2014. The report identified 31

  20. Environmental Management Headquarters Corrective Action Plan - Radiological

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Release Phase II | Department of Energy II Environmental Management Headquarters Corrective Action Plan - Radiological Release Phase II The purpose ofthis Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant (WIPP) on February 14, 2014. The report identified

  1. Action Codes Table | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Action Codes Table U.S. Department of Energy / U.S. Nuclear Regulatory Commission Nuclear Materials Management & Safeguards System Action Codes Table Action codes *U.S.: **IAEA: A - Shipper's original data A B - Receiver's data accepting shipper's weights without measurement W C - Shipper's adjustment or acknowledgement C D - Receiver's adjustment or acknowledgement W, Z E - Receiver's independent measurement or determination W, Z I - Inventory difference explanation data *Historical -

  2. Load regulating expansion fixture

    DOE Patents [OSTI]

    Wagner, L.M.; Strum, M.J.

    1998-12-15

    A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils is disclosed. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components. 1 fig.

  3. Load regulating expansion fixture

    DOE Patents [OSTI]

    Wagner, Lawrence M.; Strum, Michael J.

    1998-01-01

    A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components.

  4. Solar Action Network | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name: Solar Action Network Address: PO Box 15546 Place: San Luis Obispo, California Zip: 93401 Phone Number: 5058476527 Website:...

  5. Mitigation Action Implementation Network (MAIN) | Open Energy...

    Open Energy Info (EERE)

    of Nationally Appropriate Mitigation Actions (NAMAs) and Low-Carbon Development (LCD) strategies in developing countries through regionally based dialogues, web-based...

  6. Categorical Exclusion Determination Form Proposed Action Title...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed Action Title: (0473-1597) Smart Wire Grid, Inc. - Distributed Power Flow Contro l Using Smart Wires for Energy Routing Program or Field Office: Advanced Research Projects ...

  7. Portsmouth Remedial Actions Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Remedial Action documents for: Portsmouth Site Process Buildings and Complex Facilities ... Plan for the Process Buildings and Complex Facilities D&D Evaluation Project PDF ...

  8. Action Codes Table | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Blog Home About Us Our Programs Defense Nuclear Security Nuclear Materials Management & Safeguards System NMMSS ... Action Codes Table U.S. Department of Energy ...

  9. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Truck Fire Environmental Management Headquarters Corrective Action Plan - Truck Fire The ... for addressing Office of Environmental Management (EM) Headquarters (HQ) issues ...

  10. Climate Protection Action Fund | Open Energy Information

    Open Energy Info (EERE)

    Repower America References The Climate Protetion Action Fund - Contact Us Learn More About Repower America Retrieved from "http:en.openei.orgw...

  11. Rainforest Action Network RAN | Open Energy Information

    Open Energy Info (EERE)

    pressure corporations into publicly adopting policies that protect rainforests and the human rights of those living in those areas. References: Rainforest Action Network (RAN)1...

  12. Utilities Working with Industry: Action Plan

    SciTech Connect (OSTI)

    none,

    2010-06-25

    This action plan outlines joint ITP and utility activities that will help reach a national goal of reducing energy by 25 percent over then next 10 years.

  13. Nuclear facility decommissioning and site remedial actions

    SciTech Connect (OSTI)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  14. Worldwide Energy Efficiency Action through Capacity Building...

    Open Energy Info (EERE)

    Capacity Building and Training (WEACT) Jump to: navigation, search Logo: Worldwide Energy Efficiency Action through Capacity Building and Training (WEACT) Name Worldwide...

  15. A comparison of the RCRA Corrective Action and CERCLA Remedial Action Processes

    SciTech Connect (OSTI)

    Traceski, Thomas T.

    1994-02-01

    This document provides a comprehensive side-by-side comparison of the RCRA corrective action and the CERCLA remedial action processes. On the even-numbered pages a discussion of the RCRA corrective action process is presented and on the odd-numbered pages a comparative discussion of the CERCLA remedial action process can be found. Because the two programs have a difference structure, there is not always a direct correlation between the two throughout the document. This document serves as an informative reference for Departmental and contractor personnel responsible for oversight or implementation of RCRA corrective action and CERCLA remedial action activities at DOE environmental restoration sites.

  16. Guidance Regarding Actions That May Proceed During the NEPA Process:

    Energy Savers [EERE]

    Interim Actions (DOE, 2003) | Department of Energy Actions That May Proceed During the NEPA Process: Interim Actions (DOE, 2003) Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions (DOE, 2003) DOE guidance to provide assistance in determining whether an action within the scope of an EIS may be taken before a record of decision is issued. The guidance reviews applicable requirements, gives examples of the types of actions that may proceed as interim actions,

  17. Rulison Site corrective action report

    SciTech Connect (OSTI)

    1996-09-01

    Project Rulison was a joint US Atomic Energy Commission (AEC) and Austral Oil Company (Austral) experiment, conducted under the AEC`s Plowshare Program, to evaluate the feasibility of using a nuclear device to stimulate natural gas production in low-permeability gas-producing geologic formations. The experiment was conducted on September 10, 1969, and consisted of detonating a 40-kiloton nuclear device at a depth of 2,568 m below ground surface (BGS). This Corrective Action Report describes the cleanup of petroleum hydrocarbon- and heavy-metal-contaminated sediments from an old drilling effluent pond and characterization of the mud pits used during drilling of the R-EX well at the Rulison Site. The Rulison Site is located approximately 65 kilometers (40 miles) northeast of Grand Junction, Colorado. The effluent pond was used for the storage of drilling mud during drilling of the emplacement hole for the 1969 gas stimulation test conducted by the AEC. This report also describes the activities performed to determine whether contamination is present in mud pits used during the drilling of well R-EX, the gas production well drilled at the site to evaluate the effectiveness of the detonation in stimulating gas production. The investigation activities described in this report were conducted during the autumn of 1995, concurrent with the cleanup of the drilling effluent pond. This report describes the activities performed during the soil investigation and provides the analytical results for the samples collected during that investigation.

  18. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.

  19. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    SciTech Connect (OSTI)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  20. Pressure reducing regulator

    DOE Patents [OSTI]

    Whitehead, John C. (Davis, CA); Dilgard, Lemoyne W. (Willits, CA)

    1995-01-01

    A pressure reducing regulator that controls its downstream or outlet pressure to a fixed fraction of its upstream or inlet pressure. The regulator includes a housing which may be of a titanium alloy, within which is located a seal or gasket at the outlet end which may be made of annealed copper, a rod, and piston, each of which may be made of high density graphite. The regulator is insensitive to temperature by virtue of being without a spring or gas sealed behind a diaphragm, and provides a reference for a system in which it is being used. The rod and piston of the regulator are constructed, for example, to have a 1/20 ratio such that when the downstream pressure is less than 1/20 of the upstream pressure the regulator opens and when the downstream pressure exceeds 1/20 of the upstream pressure the regulator closes.

  1. Pressure reducing regulator

    DOE Patents [OSTI]

    Whitehead, J.C.; Dilgard, L.W.

    1995-10-10

    A pressure reducing regulator that controls its downstream or outlet pressure to a fixed fraction of its upstream or inlet pressure is disclosed. The regulator includes a housing which may be of a titanium alloy, within which is located a seal or gasket at the outlet end which may be made of annealed copper, a rod, and piston, each of which may be made of high density graphite. The regulator is insensitive to temperature by virtue of being without a spring or gas sealed behind a diaphragm, and provides a reference for a system in which it is being used. The rod and piston of the regulator are constructed, for example, to have a 1/20 ratio such that when the downstream pressure is less than 1/20 of the upstream pressure the regulator opens and when the downstream pressure exceeds 1/20 of the upstream pressure the regulator closes. 10 figs.

  2. Corrective Action Plan for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada

    SciTech Connect (OSTI)

    Bechtel Nevada

    1998-08-31

    This corrective action plan provides the closure implementation methods for the Area 3 Landfill Complex, Corrective Action Unit (CAU) 424, located at the Tonopah Test Range. The Area 3 Landfill Complex consists of 8 landfill sites, each designated as a separate corrective action site.

  3. Policy and Regulations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulations Policy and Regulations map-1019833_960_720.jpg

  4. WIPP Documents - Federal Regulations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Regulations 40 CFR Part 191 Environmental radiation protection standards for management and disposal of spent nuclear fuel, high-level and transuranic radioactive wastes. 40 CFR Part 194 Criteria for the certification and re-certification of the Waste Isolation Pilot Plant's compliance with the 40 CFR Part 191 disposal regulations.

  5. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568.

  6. President's Climate Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar Energy in the United States » President's Climate Action Plan President's Climate Action Plan President’s Climate Action Plan In June 2013, President Obama put forward a broad-based plan to cut the carbon pollution that causes climate change and affects public health. Cutting carbon pollution will help spark business innovation to modernize our power plants, resulting in cleaner forms of American-made energy that will create good jobs and cut our dependence on foreign oil. Combined

  7. Enforcement actions: Significant actions resolved. Volume 14, No. 2, Part 1: Individual actions. Quarterly progress report, April--June 1995

    SciTech Connect (OSTI)

    1995-09-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1995) and includes copies of Orders sent by the Nuclear Regulatory Commission to individuals with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

  8. Corrective Action Decision Document for Corrective Action Unit 5: Landfills, Nevada Test Site, Nevada: Revision No. 0 (with Record of Technical Change No. 1)

    SciTech Connect (OSTI)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-10-24

    This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action (CAU) 5: Landfills, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Areas 5, 6, 12, 20, and 23 of the NTS, CAU 5 is comprised of eight corrective action sites (CASs). The corrective action investigation (CAI) of CAU 5 was conducted from October 7, 2002 through January 30, 2003, with geophysical surveys completed from March 6 through May 8, 2002, and topographic surveys conducted from March 11 through April 29, 2003. Contaminants of concern (COCs) were identified only at CAS 12-15-01. Those COCs included total petroleum hydrocarbons and volatile organic compounds. Based on the evaluation of analytical data from the CAI, review of future and current operations in Areas 5, 6, 12, 20, and 23 of the Nevada Test Site, and the detailed and comparative analysis of the potential CAAs, the following single alternative was developed for consideration. Close in Place with Administrative Controls is the recommended alternative for all of the CASs in CAU 5. This alternative was judged to meet all requirements for the technical components evaluated. Additionally, the alternative meets all applicable state and federal regulations for closure of the sites and will eliminate inadvertent intrusion into landfills at CAU 5.

  9. double-action | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reversible Ionic Liquids as Double-Action Solvents for Efficient CO2 Capture Project No.: ... a solvent that results in a less-expensive, more energy efficient CO2 scrubbing system. ...

  10. Green Building Action Plan for State Facilities

    Broader source: Energy.gov [DOE]

    On December 14, 2005, California’s governor signed Executive Order S-20-04, creating a Green Building Action Plan to improve the energy performance of all state buildings. The order established...

  11. Action South Facing | Open Energy Information

    Open Energy Info (EERE)

    search Name: Action South Facing Place: United Kingdom Zip: HP2 6HG Sector: Buildings Product: UK-based installer of grid-connected PV systems on commercial buildings in...

  12. Processing Financial Assistance Actions in STRIPES

    Broader source: Energy.gov [DOE]

    The attached booklet is a companion to the STRIPES Financial Assistance Desk Guide. It provides tips on processing financial assistance actions in STRIPES. The booklet will be available in the...

  13. Federal Actions to Address Impacts of Uranium

    Office of Legacy Management (LM)

    Federal Actions to Address Impacts of Uranium Contamination in the Navajo Nation 2014 Page | i TABLE OF CONTENTS Executive Summary ....................................................................................................................... 1 Introduction .................................................................................................................................... 2 Summary of Work Completed 2008-2012

  14. QER- Comment of Berkshire Environmental Action Team

    Broader source: Energy.gov [DOE]

    Dear members of the Quadrennial Energy Review Task Force, Please find attached comments from the Berkshire Environmental Action Team, Inc. (BEAT) regarding the proposed natural gas pipeline expansion. Thank you for considering our comments.

  15. Portsmouth Removal Actions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report for Phases I and II of X-334 Transformer CleaningStorage Building at Portsmouth - Nov 2011 PDF icon Removal Action Completion Report for X-103 Auxiliary Office Building ...

  16. Easy Energy Action Plan Checklist | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Easy Energy Action Plan Checklist Easy Energy Action Plan Checklist 10 Simple Ways To Use Energy Wisely PDF icon EnergyActionChecklist_English.pdf PDF icon EnergyActionChecklist_Spanish.pdf More Documents & Publications Ahorre Energía Get Current: Switch on Clean Energy Activity Book Easy Energy Action Plan Checklist Conocimiento de Energia

  17. EM International Program Action Table - June 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Action Table - June 2014 EM International Program Action Table - June 2014 EM International Program Action Table - June 2014 PDF icon EM International Program Action Table - June 2014 More Documents & Publications International Program Action Table - October 2012 Across the Pond Newsletter Issue 9 Across the Pond Newsletter Issue 3

  18. CPR_RemedialAction_flowchart_final.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    characterize site STOP no further action needed No Yes Is development successful? 4b No Yes Is it appropriate to invest time and money in new treatment technologies? (consider risk) 4a Yes No Are treatment technologies available? 4 Yes No Are retrieval technologies available? 3 Yes No Does the waste site require action? (consider risk) 2 Has the waste site been adequately characterized? 1 Yes No Yes No Are disposal alternatives available? 5 Yes No Are retrieval, treatment and disposal

  19. Corrective Action Plan for Environmenta' Management Headquarters

    Energy Savers [EERE]

    Corrective Action Plan for Environmenta' Management Headquarters Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant on February 14~ 2014 Washington, DC 20585 August 2015 Corrective Action Plan for Environmental Management Headquarters Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant on February 14, 2014 Deputy Assistant Secretary for Safety, Security, and Quality Programs Environmental Management Approved by: Monica Regalbuto Assistant Secretary for

  20. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    SciTech Connect (OSTI)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program, Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.

  1. Nuclear facility decommissioning and site remedial actions

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

  2. State-federal interactions in nuclear regulation

    SciTech Connect (OSTI)

    Pasternak, A.D.; Budnitz, R.J.

    1987-12-01

    The Atomic Energy Act of 1954 established, and later Congressional amendments have confirmed, that except in areas which have been explicitly granted to the states, the federal government possesses preemptive authority to regulate radiation hazards associated with the development and use of atomic energy. Since the passage of the original Act, numerous decisions by the courts have reaffirmed the legitimacy of federal preemption, and have defined and redefined its scope. In this study, the aim is to explore the underlying issues involved in federal preemption of radiation-hazard regulation, and to recommend actions that the Department of Energy and other agencies and groups should consider undertaking in the near term to protect the preemption principle. Appropriate roles of the states are discussed, as well as recent state-level activities and their rationale, and several current arenas in which state-federal conflicts about regulation of hazards are being played out. The emphasis here is on four particular arenas that are now important arenas of conflict, but the issues discussed are far broader in scope. These four arenas are: state-level moratorium activity; emergency planning for reactors; conflicts arising from state financial regulation; and inroads in federal preemption through litigation under state law.

  3. Of Refrigerators & Regulations

    Broader source: Energy.gov [DOE]

    Editor's Note: This entry has been cross-posted from The White House Blog. The President took a moment during his speech to put the debate over regulation in a different perspective.

  4. HIGH PRESSURE GAS REGULATOR

    DOE Patents [OSTI]

    Ramage, R.W.

    1962-05-01

    A gas regulator operating on the piston and feedback principle is described. The device is particularly suitable for the delicate regulation of high pressure, i.e., 10,000 psi and above, gas sources, as well as being perfectly adaptable for use on gas supplies as low as 50 psi. The piston is adjustably connected to a needle valve and the movement of the piston regulates the flow of gas from the needle valve. The gas output is obtained from the needle valve. Output pressure is sampled by a piston feedback means which, in turn, regulates the movement of the main piston. When the output is other than the desired value, the feedback system initiates movement of the main piston to allow the output pressure to be corrected or to remain constant. (AEC)

  5. Tonopah Test Range Summary of Corrective Action Units

    SciTech Connect (OSTI)

    Ronald B. Jackson

    2007-05-01

    Corrective Action Sites (CASs) and Corrective Action Units (CAUs) at the Tonopah Test Range (TTR) may be placed into three categories: Clean Closure/No Further Action, Closure in Place, or Closure in Progress.

  6. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 528: POLYCHLORINATED BIPHENYLS CONTAMINATION NEVADA TEST SITE, NEVADA

    SciTech Connect (OSTI)

    BECHTEL NEVADA

    2005-06-01

    Corrective Action Unit (CAU) 528: Polychlorinated Biphenyls Contamination is listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO, 1996) and is located in Area 25 of the Nevada Test Site. CAU 528 was created to address polychlorinated biphenyl (PCB) contamination identified during the CAU 262 corrective action investigation. CAU 528 consists of one Corrective Action Site (CAS): CAS 25-27-03, Polychlorinated Biphenyls Surface Contamination.

  7. Enforcement actions: Significant actions resolved material licensees. Semiannual progress report, July--December 1996

    SciTech Connect (OSTI)

    1997-04-01

    This compilation summarizes significant enforcement actions that have been resolved during the period and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to material licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  8. Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans

    SciTech Connect (OSTI)

    none,

    2009-07-01

    EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.

  9. The Climate Change Action Plan: Technical supplement

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This Technical Annex documents the assumptions and parameters used in developing the supporting analysis for the Climate Change Action Plan (the Plan) issued by President Clinton on October 19, 1993. The Annex is intended to meet the needs of independent energy and environmental analysts who wish to better understand the Plan, its analytical underpinnings, and the events that need to transpire for the emissions reductions called for in the Plan to be realized. The Plan documented in this Annex reflects the outcome of a wide-ranging effort by Government agencies and interested members of the public to develop and implement actions that can reduce net greenhouse gas emissions in the year 2000 to their aggregate 1990 level. Based on agency and public input, the Climate Change Mitigation Group, chaired by the White House Office on Environmental Policy, developed the Plan`s content. Many of the actions called for in the Plan are now underway, while others are in advanced planning pending congressional action on the fiscal year 1995 budget. The analysis supporting the Plan represents the results of an interagency effort. The US Department of Energy (DOE) was responsible for the integrated analysis of energy-related options, based on the analysis of individual energy-related options by DOE, the US Environmental Protection Agency (EPA), and the US Department of Transportation (DOT). EPA led in providing analysis for actions related to methane, hydrofluorocarbons, and perfluorocarbons. The US Department of Agriculture (USDA) led the analysis of carbon sequestration actions and cooperated with EPA in the analysis of actions to reduce nitrous oxide emissions.

  10. EAC Recommendations for DOE Action Regarding the Power Marketing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recommendations for DOE Action Regarding the Power Marketing Administrations - June 18, 2012 EAC Recommendations for DOE Action Regarding the Power Marketing Administrations - June ...

  11. EIS-0218: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EIS-0218: Mitigation Action Plan Implementation of a Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel The ...

  12. FACT SHEET: Energy Department Actions to Deploy Combined Heat...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FACT SHEET: Energy Department Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency FACT SHEET: Energy Department Actions to Deploy Combined Heat and Power, Boost ...

  13. EIS-0389: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Action Plan EIS-0389: Mitigation Action Plan Trinity Public Utilities District Direct Interconnection Project Western Area Power Administration (Western) proposes to...

  14. One Year into President's Climate Action Plan, Finance Playing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    One Year into President's Climate Action Plan, Finance Playing an Important Role One Year into President's Climate Action Plan, Finance Playing an Important Role June 25, 2014 - ...

  15. Energy Department Actions to Deploy Combined Heat and Power,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency Energy Department Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency October 21, 2013 -...

  16. San Francisco, California: Solar in Action (Brochure), Solar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Francisco, California: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Francisco, California: Solar in Action (Brochure), Solar ...

  17. LEDS Collaboration in Action Workshop Attendee List | Open Energy...

    Open Energy Info (EERE)

    LEDS Collaboration in Action Workshop Attendee List (Redirected from LEDS Collaboration in Action Workshop Participating Countries) Jump to: navigation, search Low Emission...

  18. Mitigation Action Plans and Scenarios (MAPS) | Open Energy Information

    Open Energy Info (EERE)

    Mitigation Action Plans and Scenarios (MAPS) (Redirected from CIFF-Chile-Mitigation Action Plans and Scenarios (MAPS)) Jump to: navigation, search Retrieved from "http:...

  19. Vietnam-Renewable Energy Action Plan | Open Energy Information

    Open Energy Info (EERE)

    Renewable Energy Action Plan Jump to: navigation, search Name Vietnam-Renewable Energy Action Plan AgencyCompany Organization World Bank Sector Energy Focus Area Renewable Energy...

  20. EO 12114: Environmental Effects Abroad of Major Federal Actions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline (DOE, 1981) Unified Procedures Applicable to Major Federal Actions Relating to Nuclear Activities ...

  1. U.S. Mayor's Climate Protection Agreement: Climate Action Handbook...

    Open Energy Info (EERE)

    Action Handbook offers examples of actions that local governments can take to reduce global warming emissions and implement the commitments for climate protection called out...

  2. Department of Energy Initiates Formal Enforcement Action in Los...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Initiates Formal Enforcement Action in Los Alamos National Laboratory Classified Information Breach Department of Energy Initiates Formal Enforcement Action in Los Alamos National ...

  3. Los Alamos National Security Corrective Action Plan - Radiological...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security Corrective Action Plan - Radiological Release Phase II Los Alamos National Security Corrective Action Plan - Radiological Release Phase II Los Alamos National Security ...

  4. Angola-Nationally Appropriate Mitigation Actions (NAMAs) in the...

    Open Energy Info (EERE)

    Angola-Nationally Appropriate Mitigation Actions (NAMAs) in the Congo Basin Jump to: navigation, search Name Angola-Nationally Appropriate Mitigation Actions (NAMAs) in the Congo...

  5. Seattle, Washington: Solar in Action (Brochure), Solar America...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Seattle, Washington: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Seattle, Washington: Solar in Action (Brochure), Solar America ...

  6. Corrective Action Tracking System User's Guide | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    September 07, 2004 Corrective Action Tracking System (CATS) User's Guide for Direct Web Access The Department of Energy (DOE) Corrective Action Management Program (CAMP) prescribes...

  7. US-China Partnership for Climate Action | Open Energy Information

    Open Energy Info (EERE)

    US-China Partnership for Climate Action Jump to: navigation, search Name US-China Partnership for Climate Action AgencyCompany Organization Institute for Sustainable Communities...

  8. Houston, Texas: Solar in Action (Brochure), Solar America Cities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Houston, Texas: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Houston, Texas: Solar in Action (Brochure), Solar America Cities, ...

  9. EIS-0464: Mitigation Action Plan | Department of Energy

    Office of Environmental Management (EM)

    Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas This Mitigation Action Plan (MAP) briefly describes the mitigation actions ...

  10. San Antonio, Texas: Solar in Action (Brochure), Solar America...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Antonio, Texas: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Antonio, Texas: Solar in Action (Brochure), Solar America Cities, ...

  11. Burundi-National Adaptation Plan of Action to Climate Change...

    Open Energy Info (EERE)

    National Adaptation Plan of Action to Climate Change Jump to: navigation, search Name Burundi-National Adaptation Plan of Action to Climate Change AgencyCompany Organization...

  12. Ethiopia-Climate Change National Adaptation Programme of Action...

    Open Energy Info (EERE)

    Climate Change National Adaptation Programme of Action Jump to: navigation, search Name Ethiopia-Climate Change National Adaptation Programme of Action AgencyCompany Organization...

  13. Bangladesh Climate Change Strategy and Action Plan | Open Energy...

    Open Energy Info (EERE)

    Bangladesh Climate Change Strategy and Action Plan Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Bangladesh Climate Change Strategy and Action Plan AgencyCompany...

  14. India National Action Plan on Climate Change | Open Energy Information

    Open Energy Info (EERE)

    Action Plan on Climate Change Jump to: navigation, search Tool Summary LAUNCH TOOL Name: India National Action Plan on Climate Change AgencyCompany Organization: India Prime...

  15. Rwanda-National Adaptation Programs of Action to Climate Change...

    Open Energy Info (EERE)

    National Adaptation Programs of Action to Climate Change Jump to: navigation, search Name Rwanda-National Adaptation Programs of Action to Climate Change AgencyCompany...

  16. Indonesia National Action Plan Addressing Climate Change | Open...

    Open Energy Info (EERE)

    National Action Plan Addressing Climate Change Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Indonesia National Action Plan Addressing Climate Change AgencyCompany...

  17. PIA - Savannah River Operations Office Executive Commitment Action...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations ...

  18. Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions (January 2009) Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions (January 2009) The purpose of...

  19. Chapter 50 - Extraordinary Contractual Actions and the Safety...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Act PDF icon 50.1ExtraordinaryContractualActions0.pdf More Documents & Publications Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions (January 2009) Source...

  20. ROOT CAUSE ANALYSIS AND CORRECTIVE ACTION PLAN CLOSURE REPORT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ROOT CAUSE ANALYSIS AND CORRECTIVE ACTION PLAN CLOSURE REPORT ROOT CAUSE ANALYSIS AND CORRECTIVE ACTION PLAN CLOSURE REPORT The Department conducted a root cause analysis (RCA) ...

  1. Environmental Management Los Alamos Field Corrective Action Plan...

    Energy Savers [EERE]

    Los Alamos Field Corrective Action Plan - Radiological Release Phase II Environmental Management Los Alamos Field Corrective Action Plan - Radiological Release Phase II On March...

  2. Two Tribes Recognized as Climate Action Champions During White...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Two Tribes Recognized as Climate Action Champions During White House Tribal Nations Conference Two Tribes Recognized as Climate Action Champions During White House Tribal Nations ...

  3. United States and Japan Sign Joint Nuclear Energy Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy Cooperation United States and Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy ...

  4. Nuclear Waste Partnership (NWP) Corrective Action Plan - Truck...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Waste Partnership (NWP) Corrective Action Plan - Truck Fire and Radiological ... Event Corrective Action Plan under Nuclear Waste Partnership LLC Contract ...

  5. EAC Recommendations for DOE Action Regarding Consumer Acceptance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action ...

  6. DOE Action Plan Addressing the Electricity Transmission System

    Broader source: Energy.gov (indexed) [DOE]

    U.S. DEPARTMENT OF ENERGY ACTION PLAN ADDRESSING THE ELECTRICITY TRANSMISSION SYSTEM DRAFT DOE Action Plan Addressing the Electricity Transmission System 1 Table of Contents * ...

  7. EA-1706: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EA-1706: Mitigation Action Plan West Tennessee Solar Farm Project Haywood County, Tennessee Based on the analyses in the Environmental Assessment, DOE...

  8. Notice of Emergency Action - Emergency Order To Resume Limited...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Emergency Action - Emergency Order To Resume Limited Operation at the Potomac River ... Notice of Emergency Action - Emergency Order To Resume Limited Operation at the Potomac ...

  9. Tonopah Test Range Environmental Restoration Corrective Action Sites

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2010-08-04

    This report describes the status (closed, closed in place, or closure in progress) of the Corrective Action Sites and Corrective Action Units at the Tonopah Test Range

  10. Policy and Procedures for the Review of Federal Actions Impacting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy and Procedures for the Review of Federal Actions Impacting the Environment (EPA, 1984) Policy and Procedures for the Review of Federal Actions Impacting the Environment (EPA, ...

  11. EIS-0380: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : Mitigation Action Plan EIS-0380: Mitigation Action Plan Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico PDF icon Site-Wide Environmental Impact ...

  12. Orlando, Florida: Solar in Action (Brochure), Solar America Cities...

    Office of Environmental Management (EM)

    Orlando, Florida: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Orlando, Florida: Solar in Action (Brochure), Solar America Cities,...

  13. Denver, Colorado: Solar in Action (Brochure), Solar America Cities...

    Office of Environmental Management (EM)

    Denver, Colorado: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Denver, Colorado: Solar in Action (Brochure), Solar America Cities,...

  14. Ricardo's ACTION Strategy: An Enabling Light Duty Diesel Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ricardo's ACTION Strategy: An Enabling Light Duty Diesel Technology for the US Market Ricardo's ACTION Strategy: An Enabling Light Duty Diesel Technology for the US Market 2005 ...

  15. Implementation Proposal for the National Action Plan on Demand...

    Energy Savers [EERE]

    Implementation Proposal for the National Action Plan on DemandResponse - July 2011 Implementation Proposal for the National Action Plan on Demand Response - July 2011 Report to ...

  16. Energy Efficiency NAMAs and Actions | Open Energy Information

    Open Energy Info (EERE)

    NAMAs and Actions Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy Efficiency NAMAs and Actions AgencyCompany Organization: United Nations Foundation Sector:...

  17. DOE SEE Action, "Behavior Change Strategies in Traditional Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEE Action, "Behavior Change Strategies in Traditional Energy Efficiency Programs" Webinar DOE SEE Action, "Behavior Change Strategies in Traditional Energy Efficiency Programs"...

  18. Lessons Learned: Creating the Chicago Climate Action Plan | Open...

    Open Energy Info (EERE)

    Lessons Learned: Creating the Chicago Climate Action Plan Jump to: navigation, search Name Lessons Learned: Creating the Chicago Climate Action Plan AgencyCompany Organization...

  19. Microsoft Word - Actions to address lessons learned.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Actions to address Work Planning and Scheduling System lessons learned Action Executive owner Staff assigned Due date Understand the business environment of vendor references....

  20. Transition of Long-Term Response Action Management Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transition of Long-Term Response Action Management Requirements Transition of Long-Term Response Action Management Requirements The purpose of this memorandum is to provide you ...

  1. Policy and Procedures for the Review of Federal Actions Impacting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy and Procedures for the Review of Federal Actions Impacting the Environment Policy and Procedures for the Review of Federal Actions Impacting the Environment This manual...

  2. EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2011 Mitigation Action Plan Annual Report for the 2008 Los Alamos Site-Wide Environmental Impact Statement EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual ...

  3. EAC Recommendations for DOE Action Regarding the Electricity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Electricity Workforce - October 17, 2012 EAC Recommendations for DOE Action Regarding the Electricity Workforce - October 17, 2012 EAC Recommendations for DOE Action Regarding ...

  4. New Mexico state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    2014-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  5. ICDF Complex Remedial Action Work Plan

    SciTech Connect (OSTI)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  6. Supplemental Investigation Plan for FFACO Use Restrictions, Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Lynn Kidman

    2008-02-01

    This document is part of an effort to re-evaluate all FFACO URs against the current RBCA criteria (referred to in this document as the Industrial Sites [IS] RBCA process) as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006a). After reviewing all of the existing FFACO URs, the 12 URs addressed in this Supplemental Investigation Plan (SIP) could not be evaluated against the current RBCA criteria as sufficient information about the contamination at each site was not available. This document presents the plan for conducting field investigations to obtain the needed information. This SIP includes URs from Corrective Action Units (CAUs) 326, 339, 358, 452, 454, 464, and 1010, located in Areas 2, 6, 12, 19, 25, and 29 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada; and CAU 403, located in Area 3 of the Tonopah Test Range, which is approximately 165 miles north of Las Vegas, Nevada.

  7. New Jersey state information handbook: Formerly Utilized Sites Remedial Action Program

    SciTech Connect (OSTI)

    1980-10-31

    Under the implied authority of the Atomic Energy Act of 1954, as amended, radiological surveys and research work has been conducted to determine radiological conditions at former MED/AEC sites. As of this time, 31 sites in 13 states have been identified that require or may require remedial action. This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of New Jersey. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations. The loose-leaf format used in these volumes will allow the material to be updated periodically as the Remedial Action Program progresses.

  8. Federal government information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    Not Available

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations.

  9. Housekeeping category corrective action unit work plan

    SciTech Connect (OSTI)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process.

  10. Unique Auxin Regulation Mechanism Discovered

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Unique Auxin Regulation Mechanism Discovered Print The plant hormone auxin regulates many plant growth and development processes, including shoot growth, root branching, fruit...

  11. Unique Auxin Regulation Mechanism Discovered

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Auxin Regulation Mechanism Discovered Print Wednesday, 29 August 2007 00:00 The plant hormone auxin regulates many plant growth and development processes, including shoot growth,...

  12. Corrective Action Decision Document/Closure Report for Corrective Action 405: Area 3 Septic Systems, Tonopah Test Range, Nevada Rev. No.: 0, April 2002

    SciTech Connect (OSTI)

    IT Coroporation, Las Vegas, NV

    2002-04-17

    This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 405, Area 3 Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. Located on the Tonopah Test Range (TTR) approximately 235 miles north of Las Vegas, Nevada, CAU 405 consists of three Corrective Action Sites (CASs): 03-05-002-SW03, Septic Waste System (aka: Septic Waste System [SWS] 3); 03-05-002-SW04, Septic Waste System (aka: SWS 4); 03-05-002-SW07, Septic Waste System (aka: SWS 7). The CADD and CR have been combined into one report because no further action is recommended for this CAU, and this report provides specific information necessary to support this recommendation. The CAU consists of three leachfields and associated collection systems that were installed in or near Area 3 for wastewater disposal. These systems were used until a consolidated sewer system was installed in 1990. Historically, operations within various buildin gs in and near Area 3 of the TTR generated sanitary and industrial wastewaters. There is a potential that contaminants of concern (COCs) were present in the wastewaters and were disposed of in septic tanks and leachfields. The justification for closure of this CAU without further action is based on process knowledge and the results of the investigative activities. Closure activities were performed at these CASs between January 14 and February 2, 2002, and included the removal and proper disposal of media containing regulated constituents and proper closure of septic tanks. No further action is appropriate because all necessary activities have been completed. No use restrictions are required to be imposed for these sites since the investigation showed no evidence of COCs identified in the soil for CAU 405.

  13. Reviving regulation - and antitrust

    SciTech Connect (OSTI)

    Shepherd, W.G.

    1994-06-01

    The ills of utility regulation have been overstated by interested players and at least some academics. One can have the best features of both competition and regulation by a paradigm that combines some regulation with stronger antitrust enforcement. It is now obvious that the success of deregulation actually depends crucially on whether antitrust policy is effective in preventing monopoly. In fact, antitrust policies have been extremely weak since 1980, under a deliberate Reagan administration withdrawal of enforcement. Where deregulation has led to market dominance, which antitrust cannot well cure, the policy changes of the 1980`s may have created costly and irreversible mistakes in a number of major sectors. Yet fast-paced events are currently creating a frenzy of even more deregulation, supposedly to fit new {open_quotes}revolutions{close_quotes} in technology and the impacts of large mergers. Instead it is time for particular caution in electricity.

  14. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2011-04-30

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation activities. (11) CAS 23-60-01, Mud Trap Drain and Outfall, will be clean closed by removing sediment from the mud trap. As a BMP, the mud trap and outfall pipe will be removed. (12) CAS 23-99-06, Grease Trap, will be clean closed by removing sediment from the grease trap and backfilling the grease trap with grout. (13) CAS 25-60-04, Building 3123 Outfalls, will be clean closed by removing contaminated soil and the sludge-containing outfall pipe.

  15. Remedial action planning for Trench 1

    SciTech Connect (OSTI)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.

    1998-07-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site.

  16. Multi-Pollutant Legislation and Regulations (released in AEO2005)

    Reports and Publications (EIA)

    2005-01-01

    The 108th Congress proposed and debated a variety of bills addressing pollution control at electric power plants but did not pass any of them into law. In addition, the Environmental Protection Agency (EPA) currently is preparing two regulations-a proposed Clean Air Interstate Rule (pCAIR) and a Clean Air Mercury Rule (CAMR)-to address emissions from coal-fired power plants. Several states also have taken legislative actions to limit pollutants from power plants in their jurisdictions. This section discusses three Congressional air pollution bills and the EPA's pCAIR and CAMR regulations.

  17. FPDS-NG National Interest Action (NIA) Code to Track Procurement Actions Made in Support of the Pacific Earthquake and Tsunami

    Broader source: Energy.gov [DOE]

    The purpose of this Policy Flash is to advise Contracting Officers of the establishment of a new National Interest Action (NIA) Code to track procurement actions made in support of the Pacific Earthquake and Tsunami. As explained below, this action does not trigger or otherwise authorize agencies to use any Emergency Acquisition Flexibilities in Federal Acquisition Regulation (FAR) 18.2. Effective immediately, procurement actions in direct response to the Pacific earthquake and tsunami should be reported in FPDS-NG using the NIA code "Pacific Earthquake/Tsunami 2011." The NIA value for Pacific Earthquake and Tsunami is currently valid from March 11, 2011, to September 12, 2011. Since responses to this incident may be conducted inside or outside the United States, Contracting Officers should ensure that "Place of Performance" data accurately reflects where the work will be performed. Note: This NIA Code should be used only to facilitate cost collection and reporting. Use of this NIA Code does not authorize or justify use of any Emergency Acquisition Flexibilities in FAR 18.2. However, the acquisition flexibilities described in FAR 18.1 may be available, as well as others in agency acquisition supplements, to support the response to the Pacific Earthquake and Tsunami.

  18. PIA - Savannah River Operations Office Executive Commitment Action Tracking

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System | Department of Energy Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PDF icon PIA - Savannah River Operations Office Executive Commitment Action Tracking System More Documents & Publications PIA - GovTrip (DOE data) PIA - Bonneville Power Adminstration Ethics Helpline

  19. Seeing Atoms and Molecules in Action with an Electron 'Eye'

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Seeing Atoms and Molecules in Action with an Electron 'Eye' ← Previous Next →

  20. Earned Value Management System (EVMS) Corrective Action Standard Operating

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedure | Department of Energy (EVMS) Corrective Action Standard Operating Procedure Earned Value Management System (EVMS) Corrective Action Standard Operating Procedure This EVMS Corrective Action Standard Operating Procedure (ECASOP) serves as PM's primary reference for development of Corrective Action Requests (CARs) and Continuous Improvement Opportunities (CIOs), as well as the assessment of contractors procedures and implementation associated with Variance Analysis Reports (VARs) and

  1. White House Highlights Climate Action Champions' Achievements

    Broader source: Energy.gov [DOE]

    After a competitive application process, the Department of Energy designated 16 communities as Climate Action Champions, including two tribes: the Sault Ste. Marie Tribe of Chippewa Indians (Michigan) and the Blue Lake Rancheria Tribe (California). These tribes were selected for their local leadership in climate mitigation and adaptation.

  2. FTCP Corrective Action Plan- Revision 1

    Broader source: Energy.gov [DOE]

    January 2007 FTCP Corrective Action Plan, Revision 1, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004- 1, Oversight of Complex, High-Hazard Nuclear Operations

  3. Litigation, Regulation and Enforcement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    General Counsel for Legislation, Regulation and Energy Efficiency (GC-33) Litigation, Regulation and Enforcement Litigation Enforcement Legislation, Regulation and Energy ...

  4. Categorical Exclusion Determinations: Natural Gas Regulation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Natural Gas Regulation Categorical Exclusion Determinations: Natural Gas Regulation Categorical Exclusion Determinations issued by Natural Gas Regulation. DOCUMENTS AVAILABLE FOR ...

  5. FTCP Corrective Action Plan - Revision 2 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corrective Action Plan - Revision 2 FTCP Corrective Action Plan - Revision 2 FTCP Corrective Action Plan, Revision 2, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations PDF icon FTCP Corrective Action Plan Revision 2 More Documents & Publications FTCP Corrective Action

  6. Los Alamos National Security Corrective Action Plan - Radiological Release

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Phase II | Department of Energy Security Corrective Action Plan - Radiological Release Phase II Los Alamos National Security Corrective Action Plan - Radiological Release Phase II Los Alamos National Security Corrective Action Plan - Radiological Release Phase II PDF icon Los Alamos National Security Corrective Action Plan - Radiological Release Phase II More Documents & Publications Environmental Management Los Alamos Field Office Corrective Action Plan - Radiological Release Phase II

  7. Institutional Change Process Step 4: Implement an Action Plan | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 4: Implement an Action Plan Institutional Change Process Step 4: Implement an Action Plan Graphic showing 5 gears. They progress from Determine Goal to Identify Context-Rules, Roles and Tools to Develop Action Plan to Implement Plan to Measure and Evaluate. Process for Continuous Change Writing a good action plan is one thing; implementing it is another. Institutional change principles and methods can be incorporated into action plans (program design), but on-the-ground

  8. Action plan for the Tiger Team assessment report

    SciTech Connect (OSTI)

    Not Available

    1990-08-30

    This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.

  9. EIS-0486: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EIS-0486: Mitigation Action Plan Plains & Eastern Clean Line Transmission Project DOE issued a Mitigation Action Plan that explains how mitigation measures, which have been designed to mitigate adverse environmental impacts associated with the course of action directed by the Record of Decision, will be planned and implemented. For more information visit the project page: http://energy.gov/node/583039. Download Document PDF icon EIS-0486: Mitigation Action Plan More

  10. Enforcement actions: Significant actions resolved reactor licensees. Semiannual progress report, July 1996--December 1996

    SciTech Connect (OSTI)

    1997-04-01

    This compilation summarizes significant enforcement actions that have been resolved during the period (July-December 1996) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to reactor licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  11. Corrective Action Decision Document/ Closure Report for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada with Errata Sheet, Revision 0

    SciTech Connect (OSTI)

    Grant Evenson

    2008-09-01

    This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit 556, Dry Wells and Surface Release Points, located at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended February 2008). Corrective Action Unit (CAU) 556 is comprised of four corrective action sites (CASs): • 06-20-04, National Cementers Dry Well • 06-99-09, Birdwell Test Hole • 25-60-03, E-MAD Stormwater Discharge and Piping • 25-64-01, Vehicle Washdown and Drainage Pit The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 556 with no further corrective action. To achieve this, corrective action investigation (CAI) activities began on February 7 and were completed on June 19, 2008, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada (NNSA/NSO, 2007). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. The CAU 556 data were evaluated based on the data quality assessment process, which demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 556 that required the completion of a corrective action. Assessment of the data generated from investigation activities conducted at CAU 556 revealed the following: • Corrective Action Sites 06-20-04, 06-99-09, and 25-64-01 do not contain contamination at concentrations exceeding the FALs. • Polychlorinated biphenyl (PCB) contamination above the FAL was identified in the surface and/or shallow subsurface soils at the outfall and around Catch Basin 2, and in soils contained within the catch basins and the manhole at CAS 25-60-03. A corrective action of close in place with a soil removal action and use restriction (UR) was completed at CAS 25-60-03. The PCB-contaminated soils were removed from the outfall area and around Catch Basin 2, and disposed of at a Nevada Test Site landfill as part of a removal action. The catch basins and the manhole were sealed shut by filling them with grout. The end of the outfall pipe was plugged using grout, covered with soil, and the area was regraded. A UR was applied to the entire stormwater system at CAS 25-60-03, which includes the three catch basins, manhole, and associated piping. No further action is the corrective action for CASs 06-20-04, 06-99-09, and 25-64-01. The liquids in the test holes at CAS 06-99-09 were removed for disposal and the features were filled with grout as a best management practice. The drainage pipe between the vehicle washdown pad and the drainage pit at CAS 25-64-01 was sealed at each end as a best management practice. The corrective actions were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. They were judged to meet all requirements for the technical components evaluated. The corrective actions meet all applicable federal and state regulations for closure of the site and will reduce potential exposure pathways to the contaminated media to an acceptable level at CAU 556. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Maintain a UR for the entire stormwater drainage system (i.e., three catch basins, one manhole, and associated piping) at CAS 25-60-03. • No further corrective action for CAU 556. • A Notice of Completion to the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 556. • Corrective Action Unit 556 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.

  12. CORRECTIVE ACTION DECISION DOCUMENT FOR THE AREA 3 LANDFILL COMPLEX, TONOPAH TEST RANGE, CAU 424, REVISION 0, MARCH 1998

    SciTech Connect (OSTI)

    DOE /NV

    1998-03-03

    This Corrective Action Decision Document (CADD) has been prepared for the Area 3 Landfill Complex (Corrective Action Unit [CAU] 424) in accordance with the Federal Facility Agreement and Consent Order (FFACO) of 1996. Corrective Action Unit 424 is located at the Tonopah Test Range (TTR) and is comprised of the following Corrective Action Sites (CASs), each an individual landfill located around and within the perimeter of the Area 3 Compound (DOE/NV, 1996a): (1) Landfill A3-1 is CAS No. 03-08-001-A301. (2) Landfill A3-2 is CAS No. 03-08-002-A302. (3) Landfill A3-3 is CAS No. 03-08-002-A303. (4) Landfill A3-4 is CAS No. 03-08-002-A304. (5) Landfill A3-5 is CAS No. 03-08-002-A305. (6) Landfill A3-6 is CAS No. 03-08-002-A306. (7) Landfill A3-7 is CAS No. 03-08-002-A307. (8) Landfill A3-8 is CAS No. 03-08-002-A308. The purpose of this CADD is to identify and provide a rationale for the selection of a recommended corrective action alternative for each CAS. The scope of this CADD consists of the following: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (6) Recommend and justify a preferred corrective action alternative for each CAS. In June and July 1997, a corrective action investigation was performed as set forth in the Corrective Action Investigation Plan (CAIP) for CAU No. 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada (DOE/NV, 1997). Details can be found in Appendix A of this document. The results indicated four groupings of site characteristics as shown in Table ES-1. Based on the potential exposure pathways, the following corrective action objectives have been identified for CAU No. 424: (1) Prevent or mitigate human exposure to subsurface soils containing waste. (2) Remediate the site per applicable state and federal regulations (NAC, 1996c). (3) Prevent adverse impacts to groundwater quality. Based on the review of existing data, future land use, and current operations at the TTR, the following alternatives were developed for consideration at the Area 3 Landfill Complex CAU: Alternative 1 - No Action; Alternative 2 - Administrative Closure; Alternative 3 - Partial Excavation, Backfill, and Recontouring The corrective action alternatives were evaluated based on four general corrective action standards and five remedy-selection decision factors. Based on the results of this evaluation, preferred alternatives were selected for each CAS as indicated in Table ES-2. The preferred corrective action alternatives were evaluated on their technical merits, focusing on performance, reliability, feasibility, and safety. The alternatives were judged to meet all requirements for the technical components evaluated. These alternatives meet all applicable state and federal regulations for closure of the site and will reduce potential future exposure pathways to the contents of the landfills. During corrective action implementation, these alternatives will present minimal potential threat to site workers who come in contact with the waste. However, procedures will be developed and implemented to ensure worker health and safety.

  13. Regulation of Meiotic Recombination

    SciTech Connect (OSTI)

    Gregory p. Copenhaver

    2011-11-09

    Meiotic recombination results in the heritable rearrangement of DNA, primarily through reciprocal exchange between homologous chromosome or gene conversion. In plants these events are critical for ensuring proper chromosome segregation, facilitating DNA repair and providing a basis for genetic diversity. Understanding this fundamental biological mechanism will directly facilitate trait mapping, conventional plant breeding, and development of genetic engineering techniques that will help support the responsible production and conversion of renewable resources for fuels, chemicals, and the conservation of energy (1-3). Substantial progress has been made in understanding the basal recombination machinery, much of which is conserved in organisms as diverse as yeast, plants and mammals (4, 5). Significantly less is known about the factors that regulate how often and where that basal machinery acts on higher eukaryotic chromosomes. One important mechanism for regulating the frequency and distribution of meiotic recombination is crossover interference - or the ability of one recombination event to influence nearby events. The MUS81 gene is thought to play an important role in regulating the influence of interference on crossing over. The immediate goals of this project are to use reverse genetics to identify mutants in two putative MUS81 homologs in the model plant Arabidopsis thaliana, characterize those mutants and initiate a novel forward genetic screen for additional regulators of meiotic recombination. The long-term goal of the project is to understand how meiotic recombination is regulated in higher eukaryotes with an emphasis on the molecular basis of crossover interference. The ability to monitor recombination in all four meiotic products (tetrad analysis) has been a powerful tool in the arsenal of yeast geneticists. Previously, the qrt mutant of Arabidopsis, which causes the four pollen products of male meiosis to remain attached, was developed as a facile system for assaying recombination using tetrad analysis in a higher eukaryotic system (6). This system enabled the measurement of the frequency and distribution of recombination events at a genome wide level in wild type Arabidopsis (7), construction of genetic linkage maps which include positions for each centromere (8), and modeling of the strength and pattern of interference (9). This proposal extends the use of tetrad analysis in Arabidopsis by using it as the basis for assessing the phenotypes of mutants in genes important for recombination and the regulation of crossover interference and performing a novel genetic screen. In addition to broadening our knowledge of a classic genetic problem - the regulation of recombination by crossover interference - this proposal also provides broader impact by: generating pedagogical tools for use in hands-on classroom experience with genetics, building interdisciplinary collegial partnerships, and creating a platform for participation by junior scientists from underrepresented groups. There are three specific aims: (1) Isolate mutants in Arabidopsis MUS81 homologs using T-DNA and TILLING (2) Characterize recombination levels and interference in mus81 mutants (3) Execute a novel genetic screen, based on tetrad analysis, for genes that regulate meiotic recombination

  14. ELECTRON EMISSION REGULATING MEANS

    DOE Patents [OSTI]

    Brenholdt, I.R.

    1957-11-19

    >An electronic regulating system is described for controlling the electron emission of a cathode, for example, the cathode in a mass spectrometer. The system incorporates a transformer having a first secondary winding for the above-mentioned cathode and a second secondary winding for the above-mentioned cathode and a second secondary winding load by grid controlled vacuum tubes. A portion of the electron current emitted by the cathode is passed through a network which develops a feedback signal. The system arrangement is completed by using the feedback signal to control the vacuum tubes in the second secondary winding through a regulator tube. When a change in cathode emission occurs, the feedback signal acts to correct this change by adjusting the load on the transformer.

  15. Economics and regulation of petroleum futures markets

    SciTech Connect (OSTI)

    Not Available

    1980-08-01

    Because the futures market in petroleum products is a relatively recent phenomenon, the implications of public policies formulated for that market have not yet been fully explored. To provide the Office of Competition of the Department of Energy (DOE) with sufficient information to assess policy alternatives, Resource Planning Associates, Inc. (RPA) was asked to analyze the development of the futures market in No. 2 oil, assess the potential for futures markets in other petroleum products, and identify policy alternatives available to DOE. To perform this analysis, the criteria for a viable futures market was established first. Then, the experience to date with the 18-month-old futures market in No. 2 oil was examined, and the potential for viable futures markets in No. 6 oil, gasoline, jet fuel, and crude oil was assessed. Finally, how existing DOE regulations and prospective actions might affect petroleum futures market development was investigated.

  16. STEAB Renewable Energy Production Incentive (REPI) Action

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    STEAB Renewable Energy Production Incentive (REPI) Action The Renewable Energy Production Incentive (REPI) was introduced in 1992 in order to provide financial incentives that were comparable to tax credits that were available to the private sector for renewable energy generation investors and developers. The REPI program was reauthorized for an additional ten years in the Energy Policy Act of 2005. There is increasing demand being placed on private and public utilities to generate electricity

  17. National Biofuels Action Plan, October 2008

    SciTech Connect (OSTI)

    none,

    2008-10-01

    To help industry achieve the aggressive national goals, Federal agencies will need to continue to enhance their collaboration. The Biomass Research and Development (R&D) Board was created by Congress in the Biomass Research and Development Act of 2000. The National Biofuels Action Plan outlines areas where interagency cooperation will help to evolve bio-based fuel production technologies from promising ideas to competitive solutions.

  18. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM

    Office of Legacy Management (LM)

    . FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM 'FOR , ELW~~I~NREPORT FOR&fERMCKINNEYTOOLANDMANUFACT@INGCC)&iPANY ~. 1688 ARAB,EkLA ROiD CL&VELAND,OHIO ,,, .I _. .' , Jaquary 1994 ,. I U. S . De@rtment of Energy Office ,of EnvironFental Restoration ' ,' I ,,' ' , i ., ; 1 ! i ' , ' . 1 .' ( ,. ,' ," ' .~ : "' ; ,' . ' _ EliminationReport~ .' _. 5' Former McKhmey Tool add Manufacturing Company: " ' . ..,' : ., 8. ,, .: _, :. TABLE OF CONTENTS - i. /i 1' JN'

  19. Sodium dichromate expedited response action assessment

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) perform an expedited response action (ERA) for the Sodium Dichromate Barrel Disposal Landfill. The ERA lead regulatory agency is Ecology and EPA is the support agency. The ERA was categorized as non-time-critical, which required preparation of an engineering evaluation and cost analysis (EE/CA). The EE/CA was included in the ERA proposal. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA goal is to reduce the potential for any contaminant migration from the landfill to the soil column, groundwater, and Columbia River. Since the Sodium Dichromate Barrel Disposal Landfill is the only waste site within the operable unit, the removal action may be the final remediation of the 100-IU-4 Operable Unit. This ERA process started in March 1992. The ERA proposal went through a parallel review process with Westinghouse Hanford Company (WHC), DOE Richland Operations (RL), EPA, Ecology, and a 30-day public comment period. Ecology and EPA issued an Action Agreement Memorandum in March 1993 (Appendix A). The memorandum directed excavation of all anomalies and disposal of the collected materials at the Hanford Site Central Landfill. Primary field activities were completed by the end of April 1993. Final waste disposal of a minor quantity of hazardous waste was completed in July 1993.

  20. N Springs expedited response action proposal

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    Since signing the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in 1989, the parties to the agreement have recognized the need to modify the approach to conducting investigations, studies, and cleanup actions at Hanford. To implement this approach, the parties have jointly developed the Hanford Past-Practice Strategy. The strategy defines a non-time-critical expedited response action (ERA) as a response action ``needed to abate a threat to human health or welfare or the environment where sufficient time exists for formal planning prior to initiation of response. In accordance with the past-practice strategy, DOE proposes to conduct an ERA at the N Springs, located in the Hanford 100 N Area, to substantially reduce the strontium-90 transport into the river through the groundwater pathway. The purpose of this ERA proposal is to provide sufficient information to select a preferred alternative at N Springs. The nature of an ERA requires that alternatives developed for the ERA be field ready; therefore, all the technologies proposed for the ERA should be capable of addressing the circumstances at N Springs. A comparison of these alternatives is made based on protectiveness, cost, technical feasibility, and institutional considerations to arrive at a preferred alternative. Following the selection of an alternative, a design phase will be conducted; the design phase will include a detailed look at design parameters, performance specifications, and costs of the selected alternative. Testing will be conducted as required to generate design data.

  1. Interrelationship of Program Regulations and Financial Assistance Regulations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1980-04-24

    The purpose of this Order is to set forth the interrelationship between all program regulations which will result in assistance awards (Program Regulations) and the Department of Energy Assistance Regulations (DOE-AR, 10 CRF Part 600), including procedures for exceptions, deviations or waivers.

  2. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 4

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Faust, R.A.

    1983-09-01

    This bibliography of 657 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fourth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic documents of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - have been references in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; and (6) Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author, or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. Appendix A lists 264 bibliographic references to literature identified during this reporting period but not abstracted due to time constraints. Title and publication description indexes are given for this appendix. Appendix B defines frequently used acronyms, and Appendix C lists the recipients of this report according to their corporate affiliation.

  3. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2010-11-22

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.

  4. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.

  5. SUBPART B - Exception Regulations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... with respect to actions brought under the APA, an administrative appeal is a prerequisite ... II. Procedural Requirements A. Executive Order 12866 Today's regulatory action has been ...

  6. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    SciTech Connect (OSTI)

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  7. Self-regulating valve

    DOE Patents [OSTI]

    Humphreys, D.A.

    1982-07-20

    A variable, self-regulating valve having a hydraulic loss coefficient proportional to a positive exponential power of the flow rate. The device includes two objects in a flow channel and structure which assures that the distance between the two objects is an increasing function of the flow rate. The range of spacing between the objects is such that the hydraulic resistance of the valve is an increasing function of the distance between the two objects so that the desired hydraulic loss coefficient as a function of flow rate is obtained without variation in the flow area.

  8. When regulations go too far the taking of private property by environmental regulations

    SciTech Connect (OSTI)

    Plott, D.M.

    1995-12-01

    Seventy years ago Justice Oliver Wendell Homes wrote in an Opinion of the United States Supreme Court that{open_quotes}...while property may be regulated to a certain extent, if regulation goes too far it will be recognized as a taking.{close_quotes} Pennsylvania Coal Co. v. Mahon, 260 U.S. 393 (1992) The Fifth Amendment of the United States Constitution provides that private property shall not be {open_quotes}taken for public use, without just compensation{close_quotes}. After lying dormant for half a century, the {open_quotes}takings{close_quotes} clause of the United States constitution is being invoked to challenge environmental regulations throughout the country. In essence, property owners are saying that if the government wants to regulate to protect wetlands, wildlife habitat and other natural resources it must pay just compensation to the property owners for the restrictions imposed upon the use of their land. During the past ten years, the U.S. Supreme Court has decided several takings cases. While the judicial branch of government has become increasingly active in takings cases, the U.S. Congress and State legislatures have also been extremely active in efforts to protect private property rights. Typically, these legislative requires a takings impact analysis by the government to determine if its actions are likely to result in the compensable taking of private property or require compensation if property values are reduced by a certain percentage. This paper reviews the judicial standards that have been established for reviewing taking claims and sets forth a framework for analyzing when a regulation goes {open_quotes}too far{close_quotes} so as to require payment of compensation.

  9. Temperature controlled high voltage regulator

    DOE Patents [OSTI]

    Chiaro, Jr., Peter J. (Clinton, TN); Schulze, Gerald K. (Knoxville, TN)

    2004-04-20

    A temperature controlled high voltage regulator for automatically adjusting the high voltage applied to a radiation detector is described. The regulator is a solid state device that is independent of the attached radiation detector, enabling the regulator to be used by various models of radiation detectors, such as gas flow proportional radiation detectors.

  10. 2014 Directory of Potential Stakeholders for DOE Actions under...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 Directory of Potential Stakeholders for DOE Actions under NEPA Issued 2014 Directory of Potential Stakeholders for DOE Actions under NEPA Issued July 7, 2014 - 5:02pm Addthis ...

  11. 2012 National Energy Assurance Planning Conference After-Action...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Assurance Planning Conference After-Action Report (August 2012) 2012 National Energy Assurance Planning Conference After-Action Report (August 2012) On June 28-29, 2012, the...

  12. FORMERLY REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT...

    Office of Legacy Management (LM)

    30 1985 Department of Energy Office of Nuclear Waste Office of Remedial Action and Waste ... The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and ...

  13. EAC Recommendations for DOE Action Regarding Non-Wires Solutions...

    Office of Environmental Management (EM)

    Non-Wires Solutions - October 17, 2012 EAC Recommendations for DOE Action Regarding Non-Wires Solutions - October 17, 2012 EAC Recommendations for DOE Action Regarding Non-Wires...

  14. Audit of Selected Hazardous Waste Remedial Actions Program Costs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hazardous Waste Remedial Actions Program Costs, ER-B-97-04 Audit of Selected Hazardous Waste Remedial Actions Program Costs, ER-B-97-04 PDF icon Audit of Selected Hazardous Waste ...

  15. Corrective Action Tracking System (CATS) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The CATS web-based database is used to enter, track, and report the status of corrective actions developed and implemented in the DOE Corrective Action Management Program (CAMP) to...

  16. EIS-0473: Mitigation Action Plan | Department of Energy

    Office of Environmental Management (EM)

    EIS-0473: Mitigation Action Plan W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas This Mitigation Action Plan (MAP) briefly describes the ...

  17. EIS-0026: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0026: Mitigation Action Plan Waste Isolation Pilot Plant This MAP focuses on ... Action Plan, is the central focus of this MAP and will be updated as needed to allow for ...

  18. Process safety management and interim or remedial action plans

    SciTech Connect (OSTI)

    Boss, M.J.; Henney, D.A.; Heitzman, V.K. [HWS Consulting Group, Inc., Omaha, NE (United States); Day, D.W. [Army Corps of Engineers, Omaha, NE (United States)

    1996-12-31

    Remedial Actions, including Interim Remedial Activities, often require the use of treatment facilities or stabilization techniques using on-site chemical processes. As such, the 29 CFR 1910.119 Process Safety Management (PSM) of Highly Hazardous Chemicals (PSM Standard) and the USEPA regulations for Risk Management Planning require that these chemicals and their attendant potential hazards be identified. A Hazard and Operation (HAZOP) study, Failure Mode and Effect Analysis (FMEA), Fault Tree Analysis, or equivalent graphic presentation of processes must be completed. These studies form a segment of the Process Hazard Analysis (PHA). HAZOP addresses each system and each element of a system that could deviate from normal operations and thus cause a hazard. A full assessment of each process is produced by looking at the hazards, consequences, causes and personnel protection needed. Many variables must be considered when choosing the appropriate PHA technique including the size of the plant, the number of processes, the types of processes, and the types of chemicals used. A mixture of these techniques may be required to adequately transmit information about the process being evaluated.

  19. Managing Legacy Records for Formerly Utilized Sites Remedial Action Program

    Energy Savers [EERE]

    Sites | Department of Energy Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites (Waste Management Conference 2008) PDF icon Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites More Documents & Publications FUSRAP Overview Recent Developments in DOE FUSRAP Process for

  20. Carlsbad Field Office (CBFO) Corrective Action Plan - Truck Fire and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radiological Release | Department of Energy Carlsbad Field Office (CBFO) Corrective Action Plan - Truck Fire and Radiological Release Carlsbad Field Office (CBFO) Corrective Action Plan - Truck Fire and Radiological Release The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) actions for addressing issues identified in the March 2014, accident investigation report for the Underground Salt Haul Truck Fire at the Waste

  1. EA-1508: Mitigation Action Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    and dewatering, landscape engineering, borrow pits and recommended procedures for Raptors and powerline construction. Mitigation Action Plan to Implement Mitigation...

  2. Peru-GEF Nationally Appropriate Mitigation Actions in the Energy...

    Open Energy Info (EERE)

    (Redirected from UNDP-Peru GEF Nationally Appropriate Mitigation Actions in the Energy Generation and End-Use Sectors)...

  3. EIS-0425: Record of Decision and Mitigation Action Plan

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration Record of Decision and Mitigation Action Plan for the Mid-Columbia Restoration Project

  4. Nuclear Waste Partnership (NWP) Corrective Action Plan - Truck Fire and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radiological Release Phase I | Department of Energy - Truck Fire and Radiological Release Phase I Nuclear Waste Partnership (NWP) Corrective Action Plan - Truck Fire and Radiological Release Phase I Submittal of the Underground Salt Haul Truck Fire Corrective Action Plan and the Radiological Release Event Corrective Action Plan under Nuclear Waste Partnership LLC Contract DE-EM0001971. PDF icon Nuclear Waste Partnership (NWP) Corrective Action Plan - Truck Fire and Radiological Release Phase

  5. Guidance on the Consideration of Past Actions in Cumulative Effects

    Energy Savers [EERE]

    Analysis (CEQ, 2005) | Department of Energy on the Consideration of Past Actions in Cumulative Effects Analysis (CEQ, 2005) Guidance on the Consideration of Past Actions in Cumulative Effects Analysis (CEQ, 2005) In this Memorandum, the Council on Environmental Quality provides guidance on the extent to which agencies of the Federal government are required to analyze the environmental effects of past actions when they describe the cumulative environmental effect of a proposed action. PDF

  6. Corrective Action Plan (CAP) 2008 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corrective Action Plan (CAP) 2008 Corrective Action Plan (CAP) 2008 The Root Cause Analysis Corrective Action Plan ensures that the root causes identified in the Root Cause Analysis report are addressed with meaningful and lasting solutions in order to improve contract and project management performance. PDF icon Corrective Action Plan (CAP) 2008 Key Resources PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates More Documents & Publications Layout 1 National Defense

  7. Application of NEPA to CERCLA and RCRA Cleanup Actions

    Broader source: Energy.gov [DOE]

    The document clarifies DOE policies to streamline the environmental review of actions to be taken under CERCLA and RCRA.

  8. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR OCCIDENTAL CHEMICAL ... ELIMINATION REPORT FOR OCCIDENTAL CHEMICAL CORPORATION (FORMER HOOKER ...

  9. NREL: Climate Neutral Research Campuses - Implementing the Climate Action

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Implementing the Climate Action Plan When implementing climate action plans on research campuses, two important and related questions must be answered. How do we pay for climate actions? And, who will manage and oversee implementation of the plan? The answer to each question will be specific to your campus. Narrow climate action plans focus on incremental savings through low-cost and voluntary measures. This approach begs the question about what should be done after the short-term,

  10. EA-1628: Mitigation Action Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Lignocellulosic Biorefinery, Emmetsburg, Iowa This Mitigation Action Plan specifieis the methods for implementing mitigation measures that address the potential environmental...

  11. EIS-0380: Annual Mitigation Action Plan Annual Report

    Broader source: Energy.gov [DOE]

    Los Alamos National Laboratory Site-Wide Environmental Impact Statement Fiscal Year 2013 Mitigation Action Plan Annual Report

  12. Group action in topos quantum physics

    SciTech Connect (OSTI)

    Flori, C.

    2013-03-15

    Topos theory has been suggested first by Isham and Butterfield, and then by Isham and Doering, as an alternative mathematical structure within which to formulate physical theories. In particular, it has been used to reformulate standard quantum mechanics in such a way that a novel type of logic is used to represent propositions. In this paper, we extend this formulation to include the notion of a group and group transformation in such a way that we overcome the problem of twisted presheaves. In order to implement this we need to change the type of topos involved, so as to render the notion of continuity of the group action meaningful.

  13. Notices ACTION: Notice of Open Teleconference Meeting.

    Energy Savers [EERE]

    405 Federal Register / Vol. 78, No. 160 / Monday, August 19, 2013 / Notices ACTION: Notice of Open Teleconference Meeting. SUMMARY: This notice announces a meeting of the Advanced Scientific Computing Advisory Committee (ASCAC). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register. DATES: Tuesday, September 3, 2013, 12:00 p.m. to 3:00 p.m. ADDRESSES: The meeting is open to the public. To access the

  14. NERSC.COE.key.actions-4.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NERSC8 CoE Key Actions when optimizing for KNL Nathan Wichmann wichmann@cray.com Outline 2/24/2014 Cray Private 2 Characterization and Multi-node Considerations ● Target Science ● Profiles and Hotspots ● Scaling and Communication Single node optimizations ● Memory and cache footprint analysis ● Memory bandwidth requirements ● Vectorization ● Creating a kernel to aid in further analysis and testing Example: BerkeleyGW - FF kernel What Science do you want to run on Cori 3 Identify 1

  15. Laser action by optically depumping lower states

    DOE Patents [OSTI]

    Krupke, W.F.

    1975-11-26

    A method and apparatus are described for obtaining laser action between an upper energy level and a lower energy level of a gaseous medium. The upper energy level is populated to some degree (short of achieving a conventional inverted population) by any suitable pumping means, and an inverted population is established by transiently and selectively depumping the lower energy level. The depumping may be done by exposing the medium to an intense source of radiation which selectively causes the transformation of the lower energy level species to some other energy level. Thus, a thermally pumped/optically depumped gas laser system is produced.

  16. Laser action by optically depumping lower states

    DOE Patents [OSTI]

    Krupke, William F.

    1977-01-01

    A method and apparatus for obtaining laser action between an upper energy level and a lower energy level of a gaseous medium, which comprises populating the upper energy level to some degree (short of achieving a conventional inverted population) by any suitable pumping means, and thereafter establishing an inverted population by transiently and selectively depumping the lower energy level such as by exposing the medium to an intense source of radiation which selectively causes the transformation of the lower energy level species to some other energy level. Thus, a thermally pumped/optically depumped gas laser system is produced.

  17. Cylinder yard inspections and corrective actions

    SciTech Connect (OSTI)

    Barlow, C.R.; Ziehlke, K.T.; Pryor, W.A.

    1990-07-31

    Inspection of valves on stored uranium hexafluoride (UF{sub 6}) cylinders was initiated at the three diffusion plant sites in Oak Ridge, Tennessee, Paducah, Kentucky, and Portsmouth, Ohio as the result of the discovery of valve defects and evidence of valve leaks at the Oak Ridge K-25 plant. The coordinated inspection culminated in the identification of additional factors related to long-term safe storage of UF{sub 6}, and plans for correction of such deficiencies are presently being developed and implemented. These corrective actions supplement existing programs aimed at assurance of safe storage as summarized in the report.

  18. Int'l Smart Grid Action Network | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Int'l Smart Grid Action Network Int'l Smart Grid Action Network International PDF icon Int'l Smart Grid Action Network More Documents & Publications Clean Energy Ministerial Press Fact Sheet IEA: Tracking Clean Energy Progress: Energy Technology Perspectives 2012 Joint Statement by Energy Ministers of G8, The People's Republic of China, India and The Republic of Korea (June 2008)

  19. Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada

    SciTech Connect (OSTI)

    K. B. Campbell

    2002-04-01

    Corrective Action Unit (CAU) 490, Station 44 Burn Area is located on the Tonopah Test Range (TTR). CAU 490 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) and includes for Corrective Action Sites (CASs): (1) Fire Training Area (CAS 03-56-001-03BA); (2) Station 44 Burn Area (CAS RG-56-001-RGBA); (3) Sandia Service Yard (CAS 03-58-001-03FN); and (4) Gun Propellant Burn Area (CAS 09-54-001-09L2).

  20. Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0

    SciTech Connect (OSTI)

    Susan Evans

    2004-11-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release and migration behavior (Pohlmann et al., 2000). The second modeling phase (known as a Data Decision Analysis [DDA]) occurred after the Nevada Division of Environmental Protection reviewed the first model and was designed to respond to concerns regarding model uncertainty (Pohll and Mihevc, 2000). The third modeling phase updated the original flow and transport model to incorporate the uncertainty identified in the DDA, and focused the model domain on the region of interest to the transport predictions. This third phase culminated in the calculation of contaminant boundaries for the site (Pohll et al., 2003).

  1. Vermont Hazardous Waste Management Regulations | Open Energy...

    Open Energy Info (EERE)

    Hazardous Waste Management Regulations Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Vermont Hazardous Waste Management...

  2. Derivative expansion of the effective action

    SciTech Connect (OSTI)

    Cheyette, O.

    1987-04-01

    This paper describes some methods for calculating derivative terms in the one loop effective action for a quantum field theory. The functional approach and background field method are first used to derive the general form of the one loop determinant. Then the determinant is expanded in powers of derivatives of the background fields. The form of this expansion is described for the simple case of an interacting scalar field, and then for the more complicated problem of a non-abelian gauge field. Finally, the expansion is applied to the task of calculating Higgs mass dependent effects in the Glashow-Weinberg-Salam model, and all terms which grow with the Higgs mass M/sub H/ are found in the one loop approximation. The result of this calculation is used to find the dependence of the gauge boson mass ratio rho on M/sub H/, and also to estimate the size of corrections to W and Z scattering theorems.

  3. Regulators, Boards, Councils - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Hanford Cleanup Regulators, Boards, Councils About Us About Hanford Cleanup Regulators, Boards, Councils Hanford Advisory Board Hanford Natural Resource Trustee Council Environmental Protection Agency Washington State Department of Ecology Defense Nuclear Facilities Safety Board Hanford History Hanford Site Wide Programs Contact Us Regulators, Boards, Councils Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size There are numerous entities involved in Hanford

  4. Unique Auxin Regulation Mechanism Discovered

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Unique Auxin Regulation Mechanism Discovered Unique Auxin Regulation Mechanism Discovered Print Wednesday, 29 August 2007 00:00 The plant hormone auxin regulates many plant growth and development processes, including shoot growth, root branching, fruit ripening, tropisms, and flowering. But how such a simple molecule elicits such a variety of cellular responses has been a mystery. An important breakthrough came in 2005, wh en a conserved plant protein known as TIR1 (part of a protein destruction

  5. Collegiate Wind Competition Rules and Regulations | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Collegiate Wind Competition Rules and Regulations Collegiate Wind Competition Rules and Regulations The competition challenges interdisciplinary teams of undergraduate students ...

  6. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    SciTech Connect (OSTI)

    Ewy, Ann; Hays, David

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  7. Structure, Function and Regulation of the Clostridium cellulovorans Cellulosome

    SciTech Connect (OSTI)

    Doi, Roy H

    2008-06-01

    Our major goal for this project (2004-2008) was to obtain an understanding ofthe structure, function, and regulation of the Clostridium cellulovorans cellulosomes. Our specific goals were to select genes for cellulosomal and non-cellulosomal enzymes and characterize their products, to study the synergistic action between cellulosomal and non-cellulosomal enzymes, to study the composition of cellulosomes when cells were grown with different carbon sources, continue our studies on the scaffolding protein and examine heterologous expression of cellulosomal genes in Bacillus subtilis. We fulfilled the specific goals of our proposal.

  8. Street sweeping and stormwater regulations

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This article examines the role of street sweeping in meeting the requirements of the Clean Water Act stormwater regulations. The article identifies those industrial and municipal activities which are covered by the regulations and cites frequent sweeping of site surfaces for industry and street sweeping for municipalities as an integral part of compliance plans.

  9. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  10. Corrective action decision document, Second Gas Station, Tonopah test range, Nevada (Corrective Action Unit No. 403)

    SciTech Connect (OSTI)

    1997-11-01

    This Corrective Action Decision Document (CADD) for Second Gas Station (Corrective Action Unit [CAU] No. 403) has been developed for the U.S. Department of Energy`s (DOE) Nevada Environmental Restoration Project to meet the requirements of the Federal Facility Agreement and Consent Order (FFACO) of 1996 as stated in Appendix VI, {open_quotes}Corrective Action Strategy{close_quotes} (FFACO, 1996). The Second Gas Station Corrective Action Site (CAS) No. 03-02-004-0360 is the only CAS in CAU No. 403. The Second Gas Station CAS is located within Area 3 of the Tonopah Test Range (TTR), west of the Main Road at the location of former Underground Storage Tanks (USTs) and their associated fuel dispensary stations. The TTR is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air and approximately 56 km (35 mi) southeast of Tonopah, Nevada, by road. The TTR is bordered on the south, east, and west by the Nellis Air Force Range and on the north by sparsely populated public land administered by the Bureau of Land Management and the U.S. Forest Service. The Second Gas Station CAS was formerly known as the Underground Diesel Tank Site, Sandia Environmental Restoration Site Number 118. The gas station was in use from approximately 1965 to 1980. The USTs were originally thought to be located 11 meters (m) (36 feet [ft]) east of the Old Light Duty Shop, Building 0360, and consisted of one gasoline UST (southern tank) and one diesel UST (northern tank) (DOE/NV, 1996a). The two associated fuel dispensary stations were located northeast (diesel) and southeast (gasoline) of Building 0360 (CAU 423). Presently the site is used as a parking lot, Building 0360 is used for mechanical repairs of vehicles.

  11. Memorandum for Federal NEPA Contacts: Emergency Actions and NEPA (CEQ,

    Energy Savers [EERE]

    2005) | Department of Energy Federal NEPA Contacts: Emergency Actions and NEPA (CEQ, 2005) Memorandum for Federal NEPA Contacts: Emergency Actions and NEPA (CEQ, 2005) This Council on Environmental Quality memorandum provides: General information on the response to hurricane Katrina Reporting oil and chemical spills Projected long term recovery efforts How agencies can respond to emergencies and comply with NEPA PDF icon Emergency Actions and NEPA PDF icon Alternative Arrangements approved

  12. The United States Releases its Open Government National Action Plan |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy The United States Releases its Open Government National Action Plan The United States Releases its Open Government National Action Plan September 20, 2011 - 1:58pm Addthis Cammie Croft Cammie Croft Former Senior Advisor and Director of New Media & Citizen Engagement Today, President Obama signs the Open Government Partnership declaration, unveiling the U.S. Open Government National Action Plan. At the Energy Department, we are committed to creating a more efficient

  13. United States -Japan Joint Nuclear Energy Action Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy -Japan Joint Nuclear Energy Action Plan United States -Japan Joint Nuclear Energy Action Plan President Bush of the United States and Prime Minister Koizumi of Japan have both stated their strong support for the contribution of nuclear power to energy security and the global environment. Japan was the first nation to endorse President Bush's Global Nuclear Energy Partnership. This describes a background of the partnership. PDF icon United States -Japan Joint Nuclear Energy Action Plan

  14. Insights from Smart Meters: Identifying Specific Actions, Behaviors, and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Characteristics That Drive Savings in Behavior-Based Programs | Department of Energy Identifying Specific Actions, Behaviors, and Characteristics That Drive Savings in Behavior-Based Programs Insights from Smart Meters: Identifying Specific Actions, Behaviors, and Characteristics That Drive Savings in Behavior-Based Programs In this report, we use smart meter data to analyze specific actions, behaviors, and characteristics that drive energy savings in a BB program. Specifically, we examine a

  15. Environmental Effects Abroad of Major Federal Actions (CEQ, 1979) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Environmental Effects Abroad of Major Federal Actions (CEQ, 1979) Environmental Effects Abroad of Major Federal Actions (CEQ, 1979) On January 4, 1979, President Carter signed Executive Order 12114, entitled Environmental Effects of Major Federal Actions. The purpose of this Council on Environmental Quality memorandum is to initiate the consultation process required by this Executive Order. PDF icon 44 Fed Reg 18633: Council on Environmental Quality: Environmental

  16. Environmental Management Headquarters Corrective Action Plan - Truck Fire |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Truck Fire Environmental Management Headquarters Corrective Action Plan - Truck Fire The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Underground Salt Haul Truck Fire at the Waste Isolation Pilot Plant (WIPP) February 5, 2014. The report identified 22 Conclusions and 35 Judgments of

  17. Guidance on NEPA Review for Corrective Actions under the Resource

    Energy Savers [EERE]

    Conservation and Recovery Act (RCRA) (DOE, 1997) | Department of Energy Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) (DOE, 1997) Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) (DOE, 1997) This guidance results from the work of a Task Team formed by DOE's Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a

  18. Uranium Mill Tailings Remedial Action Program. Annual status report

    SciTech Connect (OSTI)

    Not Available

    1983-12-01

    The FY 1983 project accomplishments are: completed the Remedial Action Plan and Phase I engineering design for the Canonsburg processing site; completed remedial action on an additional 52 vicinity properties and the inclusion of an additional 303 properties in the Uranium Mill Tailings Remedial Action Project; executed cooperative agreements with four states and the Navajo Nation; published the draft environmental impact statement for Salt Lake City site; and issued the approved Project Plan.

  19. Audit of Selected Hazardous Waste Remedial Actions Program Costs,

    Energy Savers [EERE]

    ER-B-97-04 | Department of Energy of Selected Hazardous Waste Remedial Actions Program Costs, ER-B-97-04 Audit of Selected Hazardous Waste Remedial Actions Program Costs, ER-B-97-04 PDF icon Audit of Selected Hazardous Waste Remedial Actions Program Costs, ER-B-97-04 More Documents & Publications Audit Report: CR-B-97-04 Audit Report: IG-0443 Semiannual Report to Congress: April 1 - September 30, 1997

  20. EA-1562-SA-1: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EA-1562-SA-1: Mitigation Action Plan Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington (Mitigation Action Plan for Phase II Build Out, North Federal Campus, PNNL Site) This mitigation plan describes the compensatory mitigation and monitoring commitments under DOE resource management guidelines for the clearing and grading, and subsequent loss of mature shrub-steppe habitat associated with Phase II

  1. EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grid - June 6, 2013 | Department of Energy Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid, approved at the June 5-6, 2013 EAC Meeting. PDF icon EAC Recommendations for DOE Action on Consumer Acceptance of Smart Grid - June 6, 2013 More Documents & Publications DOE Responses to EAC Work Products - September 2013 Re:

  2. EAC Recommendations for DOE Action Regarding the Electricity Workforce -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 17, 2012 | Department of Energy the Electricity Workforce - October 17, 2012 EAC Recommendations for DOE Action Regarding the Electricity Workforce - October 17, 2012 EAC Recommendations for DOE Action Regarding the Electricity Workforce, approved at the October 15-16, 2012 EAC Meeting. PDF icon EAC Recommendations for DOE Action on the Electricity Workforce - October 17, 2012 More Documents & Publications Status and EAC Recommendations for Electricity Delivery Workforce

  3. DOE Webinar: Translating Behavior Change Research Into Consumer Action |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Webinar: Translating Behavior Change Research Into Consumer Action DOE Webinar: Translating Behavior Change Research Into Consumer Action DOE Webinar: Translating Behavior Change Research Into Consumer Action, May 28, 2013. PDF icon Webinar slides More Documents & Publications Incorporating Behavior Change Efforts Into Energy Efficiency Programs Outreach to Faith--Based Organizations SERC Community-Based Social Marketing for Weatherization Programs Webinar

  4. ADDENDUM TO ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE SITE

    Office of Legacy Management (LM)

    ADDENDUM TO ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE SITE PROPOSED INTERIM REMEDIAL ACTIONS FOR FY 1983-85 ACCELERATED PROGRAM (1984 VICINITY PROPERTIES CLEANUP) Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois July 1984 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee CONTENTS Page SUMMARY OF PROPOSED ACTION AND RELATED ACTIVITIES ........... 1 HISTORY AND ENVIRONMENTAL SETTING

  5. Assets in Action Community Award nominations open until December 17

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assets in Action Community Award Nominations Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue:May 2016 all issues All Issues » submit Assets in Action Community Award nominations open until December 17 If you know people who support building a strong community for youth in Los Alamos, nominate them for an Assets in Action Community Award. January 1, 2013 dummy image Read our archives. Contacts Editor Linda Anderman Email Community

  6. Guide to ground water remediation at CERCLA response action and RCRA corrective action sites

    SciTech Connect (OSTI)

    1995-10-01

    This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM`s after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide`s scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary.

  7. Comparison of RCRA SWMU corrective action and CERCLA remedial action. Master's thesis

    SciTech Connect (OSTI)

    Rupe, S.C.

    1991-09-30

    With the passage of the Hazardous and Solid Waste Amendments of 1984 and the addition of expanded authorities to require corrective action for release of hazardous constituents from solid waste management units (SWMUs) at hazardous waste treatment, storage, and disposal facilities, the Solid Waste Disposal Act (hereafter referred to as the Resource Conservation and Recovery Act or RCRA) will dramatically influence the Superfund program under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Not only will the RCRA corrective action program help prevent current RCRA sites from becoming Superfund sites, but it also offers EPA and the states an important alternative to address superfund sites that already exist. EPA recognized this and, hoping to conserve Superfund resources, developed a policy to defer listing of sites from the National Priority List if those sites can be addressed under RCRA's corrective action authorities. Private industry and federal agencies with problem sites that could qualify under either program need to compare the advantages and disadvantages of each program. EPA's deferral policy continues to evolve and appears to be ripe for expansion.

  8. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado: Revision 5

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    Title 1 of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the inactive Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. Title 2 of the UMTRCA authorized the US Nuclear Regulatory Commission (NRC) or agreement state to regulate the operation and eventual reclamation of active uranium processing sites. The uranium mill tailings at the site were removed and reprocessed from 1977 to 1979. The contaminated areas include the former tailings area, the mill yard, the former ore storage area, and adjacent areas that were contaminated by uranium processing activities and wind and water erosion. The Naturita remedial action would result in the loss of 133 acres (ac) of contaminated soils at the processing site. If supplemental standards are approved by the NRC and the state of Colorado, approximately 112 ac of steeply sloped contaminated soils adjacent to the processing site would not be cleaned up. Cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers.

  9. Closure Report Central Nevada Test Area Subsurface Corrective Action Unit 443 January 2016

    SciTech Connect (OSTI)

    Findlay, Rick

    2015-11-01

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) prepared this Closure Report for the subsurface Corrective Action Unit (CAU) 443 at the Central Nevada Test Area (CNTA), Nevada, Site. CNTA was the site of a 0.2- to 1-megaton underground nuclear test in 1968. Responsibility for the site’s environmental restoration was transferred from the DOE, National Nuclear Security Administration, Nevada Field Office to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 443 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended 2011) and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. This Closure Report provides justification for closure of CAU 443 and provides a summary of completed closure activities; describes the selected corrective action alternative; provides an implementation plan for long-term monitoring with well network maintenance and approaches/policies for institutional controls (ICs); and presents the contaminant, compliance, and use-restriction boundaries for the site.

  10. Insights from Smart Meters: Identifying Specific Actions, Behaviors...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Drive Savings in Behavior-Based Programs Insights from Smart Meters: Identifying Specific Actions, Behaviors, and Characteristics That Drive Savings in Behavior-Based Programs In ...

  11. Minneapolis and Saint Paul, Minnesota: Solar in Action (Brochure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Minneapolis and Saint Paul, Minnesota: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Minneapolis and Saint Paul, Minnesota: Solar in ...

  12. Mitigation Action Plans (MAP) and Related Documents | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0218: Mitigation Action Plan Implementation of a Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel May 1, 1994 EIS-0186:...

  13. Environmental Effects Abroad of Major Federal Actions | Department...

    Broader source: Energy.gov (indexed) [DOE]

    4, 1979, President Carter signed Executive Order 12114, entitled Environmental Effects of Major Federal Actions. The purpose of this Council on Environmental Quality memorandum is...

  14. Internal Audit Management of Corrective Action Plans | The Ames...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Internal Audit Management of Corrective Action Plans Version Number: 1.0 Document Number: Procedure 10300.001 Effective Date: 01...

  15. Internal Audit Management of Corrective Action Plans | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Internal Audit Management of Corrective Action Plans Version Number: 1.0 Document Number: Procedure 10300.001 Effective Date: 01

  16. Carlsbad Field Office (CBFO) Corrective Action Plan - Truck Fire...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    issues identified in the March 2014, accident investigation report for the Underground ... CBFO corrective actions responsive to the three Accident Investigation Boards' reports. ...

  17. NNSA Contract Reform in Action: Supply Chain Management Center...

    National Nuclear Security Administration (NNSA)

    Contract Reform in Action: Supply Chain Management Center | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile...

  18. The Space-Based Telescopes for Actionable Refinement of Ephemeris...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: The Space-Based Telescopes for Actionable Refinement of Ephemeris Pathfinder Mission Citation Details In-Document Search Title: The Space-Based Telescopes for ...

  19. EIS-0422: Mitigation Action Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Mitigation measures and estimated time of implementation within the Mitigation Action Plan for the Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project. Mitigation...

  20. Motivate Homeowner Action With Updated DOE Incentives Database...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Motivate Homeowner Action With Updated DOE Incentives Database Is customer motivation a barrier to marketing upgrades in your community? You can find ideas for incentives faster ...

  1. LEDS Collaboration in Action Workshop Arrival Form | Open Energy...

    Open Energy Info (EERE)

    or edit this page on OpenEI.org. Retrieved from "http:en.openei.orgwindex.php?titleLEDSCollaborationinActionWorkshopArrivalForm&oldid588683" Feedback Contact needs...

  2. LEDS Collaboration in Action Workshop Links | Open Energy Information

    Open Energy Info (EERE)

    LEDS Collaboration in Action Workshop Links Jump to: navigation, search Low Emission Development Strategies Global Partnership Advancing climate-resilient, low-emission development...

  3. LEDS Collaboration in Action Workshop Accommodations | Open Energy...

    Open Energy Info (EERE)

    LEDS Collaboration in Action Workshop Accommodations Jump to: navigation, search Low Emission Development Strategies Global Partnership Advancing climate-resilient, low-emission...

  4. LEDS Collaboration in Action Workshop Agenda | Open Energy Information

    Open Energy Info (EERE)

    LEDS Collaboration in Action Workshop Agenda Jump to: navigation, search Low Emission Development Strategies Global Partnership Advancing climate-resilient, low-emission...

  5. LEDS Collaboration in Action Workshop Participant Pack | Open...

    Open Energy Info (EERE)

    LEDS Collaboration in Action Workshop Participant Pack Jump to: navigation, search Low Emission Development Strategies Global Partnership Advancing climate-resilient, low-emission...

  6. Notice of OMB Action Approving DOE Submission to Extend Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants The Office of Management and Budget (OMB) ...

  7. LEDS Collaboration in Action Workshop Contact Us | Open Energy...

    Open Energy Info (EERE)

    LEDS Collaboration in Action Workshop Contact Us Jump to: navigation, search Low Emission Development Strategies Global Partnership Advancing climate-resilient, low-emission...

  8. EA-1855: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lincoln and Spokane Counties, Washington (aka DOEEA-4406) This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact for the Creston-Bell...

  9. EA-1591: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan Palisades-Goshen Transmission Line Reconstruction Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the...

  10. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    ROHM & HAAS COMPANY PHILADELPHIA, PENNSYLYANIA Department of Energy Office of Nuclear ... Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and ...

  11. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    BETHLEHEM STEEL CORPORATION LACKAWANNA, NEW YORK Department of Energy Office of Nuclear ... Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and ...

  12. A Resiliency Action Plan for the National Renewable Energy Laboratory...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A Resiliency Action Plan for the National Renewable Energy Laboratory May 23, 2014-June 5, 2015 J. Vogel, C. Wagner, and S. Renfrow Abt Environmental Research Boulder, Colorado ...

  13. Environmental Effects Abroad of Major Federal Actions (CEQ, 1979...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline (DOE, 1981) EO 12114: Environmental Effects Abroad of Major Federal ...

  14. EA-1901: Mitigation Action Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This Mitigation Action Plan (MAP) is referenced in the Finding of No Significant Impact for the...

  15. POLICY GUIDANCE MEMORANDUM #15 Processing Personnel Actions for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Office of Personnel Management (OPM), effective September 12, 2010, requires agencies to officially document detail actions. As a result, all Servicing Human Resources Offices ...

  16. Disabled Veterans Affirmative Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guide for the Disabled Veterans' Affirmative Action Program (DVAAP) PDF icon FY16 DVAAP Plan.pdf Responsible Contacts Donna Friend HUMAN RESOURCES SPECIALIST E-mail ...

  17. EIS-0283-S2: Amended Interim Action Determination | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Plutonium Materials from the Department of Energy Standard 3013 Surveillance Program at the Savannah River Site (Amending Interim Action Determination of 12082008) DOE is ...

  18. EIS-0384: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    project designers and reviewers minimized short-term and long-term environmental and social impacts of the Proposed Action through project design, consultation with regulatory...

  19. EA-1739: Mitigation Action Plan | Department of Energy

    Energy Savers [EERE]

    More Documents & Publications EA-1951: Finding of No Significant Impact and Mitigation Action Plan EA-1739: Finding of No Significant Impact EIS-0285-SA-117: Supplement Analysis

  20. EAC Recommendations for DOE Action Regarding Implementing Effective...

    Broader source: Energy.gov (indexed) [DOE]

    Implementing Effective Enterprise Security Governance, approved at the March 12-13, 2014 meeting. EAC Recommendations for DOE Action Regarding Implementing Effective Enterprise...

  1. EAC Recommendations for DOE Action Regarding Implementing Effective...

    Broader source: Energy.gov (indexed) [DOE]

    Implementing Effective Enterprise Security Governance, approved at the March 12-13, 2014 meeting. EAC Recommendations for DOE Action Regarding Implementing Effective...

  2. The Space-Based Telescopes for Actionable Refinement of Ephemeris...

    Office of Scientific and Technical Information (OSTI)

    Title: The Space-Based Telescopes for Actionable Refinement of Ephemeris Pathfinder Mission Authors: Simms, L ; De Vries, W ; RIot, V ; Olivier, S ; Pertica, A ; Bauman, B ; ...

  3. Eritrea-National Adaptation Programme of Action | Open Energy...

    Open Energy Info (EERE)

    analysis Website http:unfccc.intresourcedoc Country Eritrea UN Region Eastern Africa References Eritrea-National Adaptation Programme of Action1 This article is a...

  4. EIS-0332: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    transmission line between Bonneville Power Administration's existing McNary and John Day substations. PDF icon Mitigation Action Plan for the McNary-John Day Transmission...

  5. China-Partnership for Climate Action | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name Partnership for Climate Action - China AgencyCompany Organization Institute for Sustainable Communities (ISC) Partner World Resources Institute...

  6. EAC Recommendations for DOE Action Regarding Development of the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next...

  7. Climate Action Champions Request for Applications Informational Webinar

    Broader source: Energy.gov [DOE]

    This Webinar will provide prospective Applicants with an overview of the Climate Actions Champions Request for Applications, the application process and respond to questions posed by attendees.

  8. Take Action Now: Empower a Secure Energy Future

    Broader source: Energy.gov [DOE]

    Document features a Federal Energy Management Program (FEMP) template for creating a Take Action Now: Empower a Secure Energy Future campaign handout.

  9. Take Action Now: Empower a Secure Energy Future 2

    Broader source: Energy.gov [DOE]

    Document features a Federal Energy Management Program (FEMP) template for creating a Take Action Now: Empower a Secure Energy Future 2 handout.

  10. Unified Procedures Applicable to Major Federal Actions Relating...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Subject to Executive Order 12114 (State Department, 1979) Unified Procedures Applicable to Major Federal Actions Relating to Nuclear Activities Subject to Executive Order 12114 ...

  11. Geothermal Industry Applauds Congressional Action on Tax Legislation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on Tax Legislation Geothermal Industry Applauds Congressional Action on Tax Legislation January 1, 2013 - 4:11pm Addthis Washington, D.C. -- The Geothermal Energy Association ...

  12. EA-1858: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    boiler and a 20-megawatt steam turbine at its existing paper mill in Port Angeles, Washington. PDF icon Mitigation Action Plan for the Environmental Assessment for the...

  13. Guidance on the Consideration of Past Actions in Cumulative Effects...

    National Nuclear Security Administration (NNSA)

    discretion to determine whether, and to what extent, information about the specific nature, design, or present effects of a past action is usefbl for the agency's analysis of...

  14. LEDS Collaboration in Action Workshop Open Space Sessions | Open...

    Open Energy Info (EERE)

    LEDS Collaboration in Action Workshop Open Space Sessions Jump to: navigation, search Low Emission Development Strategies Global Partnership Advancing climate-resilient,...

  15. Nuclear Waste Partnership (NWP) Corrective Action Plan Addendum...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addendum Radiological Release Event Phase II Nuclear Waste Partnership (NWP) Corrective ... PDF icon Nuclear Waste Partnership (NWP) Corrective Action Plan Addendum Radiological ...

  16. Guidance on NEPA Review for Corrective Actions under the Resource...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental Management Program." ...

  17. U.S.-Brazil Binational Joint Action Plan

    Broader source: Energy.gov [DOE]

    U.S.-Brazil Binational Energy Working Group, formed on July 20, 2010, when DOE and the Brazilian Ministry of Mines and Energy signed a Joint Action Plan

  18. COP 18 Side Event: Advancing Collaborative Action for Low Emissions...

    Open Energy Info (EERE)

    COP 18 Side Event: Advancing Collaborative Action for Low Emissions Development Jump to: navigation, search Low Emission Development Strategies Global Partnership Advancing...

  19. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site ...

  20. Kenya-Action Plan for National Climate Change Response Strategy...

    Open Energy Info (EERE)

    these proceedings, CDKN is managing a procurement process to identify potential suppliers who may be interested in delivering this exciting and challenging Action Plan with...

  1. Mitigation Action Plans (MAP) and Related Documents | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project, Grant and Okanogon Counties, Washington November 1, 2011 EIS-0350-S1: Mitigation Action Plan Nuclear Facility Portion of the Chemistry and Metallurgy Research Building...

  2. Council on Environmental Quality - Emergency Actions and NEPA...

    Open Energy Info (EERE)

    NEPA Jump to: navigation, search OpenEI Reference LibraryAdd to library Memorandum: Council on Environmental Quality - Emergency Actions and NEPA Abstract This memorandum...

  3. Guidance on the Consideration of Past Actions in Cumulative Effects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Actions in the United States with Transboundary Effects Revised DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions (DOE, 2014)

  4. Discovery of the Fundamental Mechanism of Action of Resveratrol...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Discovery of the Fundamental Mechanism of Action of Resveratrol Thursday, May 28, 2015 Resveratrol is reported to extend lifespan and provide cardio-neuro-protective,...

  5. Release of the National Biofuels Action Plan | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the private sector to advance biofuels' deployment and development. In addition to the Biofuels Action Plan we are releasing today the first report on the potential impacts of...

  6. Stimulating Energy Efficiency Action in States | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Stimulating Energy Efficiency Action in States During Fiscal Years 2010-2013, the U.S. ... to be more competitive. From 2010 - 2013, Arkansas successfully met its goals ...

  7. Mitigation Action Plans (MAP) and Related Documents | Department...

    Broader source: Energy.gov (indexed) [DOE]

    EA-1704: Mitigation Action Plan Construction and Operation of a Proposed Cellulosic Biorefinery, BlueFire Fulton Renewable Energy, LLC, Fulton, Mississippi March 10, 2010...

  8. EIS-0425: Mitigation Action Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Project BPA decided to implement the Proposed Action of the Mid-Columbia Coho Restoration Program as described in the Mid-Columbia Coho Restoration Program Final Environmental...

  9. EIS-0323: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan for the Sacramento Area Voltage Support Project which is prepared to accompany the Sacramento Area Voltage Support Project Supplement Environmental Impact...

  10. EIS-0323: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    approval is implemented. PDF icon Mitigation Action Plan for the Sacramento Area Voltage Support Project Prepared to Accompany The Sacramento Area Voltage Support Project...

  11. DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Proposed Civil Penalty and Requests for Test Data Issued) DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and ...

  12. NOTICE OF OFFICE OF MANAGEMENT AND BUDGET ACTION

    Broader source: Energy.gov (indexed) [DOE]

    10132011 ACTION REQUESTED: Revision of a currently approved collection TYPE OF REVIEW REQUESTED: Regular ICR REFERENCE NUMBER: 201110-1910-001 AGENCY ICR TRACKING NUMBER:...

  13. Climate Action Planning: A Review of Best Practices, Key Elements...

    Open Energy Info (EERE)

    a climate action plan. The report includes detailed discussion of stakeholder involvement, establishing a target date and interim targets for achieving climate neutrality,...

  14. LEDS Collaboration in Action Workshop Biography | Open Energy...

    Open Energy Info (EERE)

    LEDS Collaboration in Action Workshop Biography Jump to: navigation, search Low Emission Development Strategies Global Partnership Advancing climate-resilient, low-emission...

  15. Central African Republic-Nationally Appropriate Mitigation Actions...

    Open Energy Info (EERE)

    Appropriate Mitigation Actions (NAMAs) in the Congo Basin AgencyCompany Organization Environment Canada, International Institute for Sustainable Development (IISD) Sector...

  16. Burundi-Nationally Appropriate Mitigation Actions (NAMAs) in...

    Open Energy Info (EERE)

    Appropriate Mitigation Actions (NAMAs) in the Congo Basin AgencyCompany Organization Environment Canada, International Institute for Sustainable Development (IISD) Sector...

  17. Rwanda-Nationally Appropriate Mitigation Actions (NAMAs) in the...

    Open Energy Info (EERE)

    Appropriate Mitigation Actions (NAMAs) in the Congo Basin AgencyCompany Organization Environment Canada, International Institute for Sustainable Development (IISD) Sector...

  18. Cameroon-Nationally Appropriate Mitigation Actions (NAMAs) in...

    Open Energy Info (EERE)

    Appropriate Mitigation Actions (NAMAs) in the Congo Basin AgencyCompany Organization Environment Canada, International Institute for Sustainable Development (IISD) Sector...

  19. US - Brazil Binational Energy Working Group Joint Action Plan...

    Broader source: Energy.gov (indexed) [DOE]

    brazilactionplan7202010.pdf More Documents & Publications U.S.-Brazil Binational Joint Action Plan Webtrends Archives by Fiscal Year - International Activities EIS-0309: Record...

  20. Audit of Selected Hazardous Waste Remedial Actions Program Costs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HAZARDOUS WASTE REMEDIAL ACTIONS PROGRAM COSTS The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. ...

  1. A regulator`s perspective on NRC`s participation in the operations & maintenance committees

    SciTech Connect (OSTI)

    Wessman, R.H.

    1996-12-01

    As a regulator fairly new to the American Society of Mechanical Engineers (ASME) Operations and Maintenance (O&M) Committee process, the author does not have a personal historical perspective as do many of the longer-term, and highly respected, members of the O&M Committee. However, as Branch Chief of the Mechanical Engineering Branch, Division of Engineering, in the Office of Nuclear Reactor Regulation at the NRC for just over two years, he has responsibility for the regulatory agency`s review of licensee actions involving the products that come from the efforts of the O&M Committee, as well as responsibility for portions of the activities of interest to other ASME Code groups such as Section III, Section XI, and Qualification of Mechanical Equipment. As a result, the author has learned a great deal about the code process in a short time. Here he gives his perspectives on the process and provides a few thoughts on the direction for the future.

  2. Improved information analysis - views and actions

    SciTech Connect (OSTI)

    Sheely, K.B.; Manatt, D.R.

    1995-07-01

    The IAEA continues to assess, develop, and test recommendations for strengthening the cost effectiveness of safeguards. The IAEA`s investigation has focused on ways to increase Agency access to data, including access to sites and site data, export/import data, environmental data, open-source data, and other expanded data sources. Although the acquisition of this raw data is essential to strengthening safeguards, the effectiveness of the system is going to be judged by what the Agency does with the data once they have acquired it. Therefore, the IAEA must have the capability to organize, analyze and present the data in a timely manner for internal management evaluation and external dissemination. The United States Department of Energy has established a Safeguards Information Management Systems (SIMS) Initiative to provide support and equipment which will improve the IAEA`s capability to utilize this expanded data to analyze State`s nuclear activities. This paper will present views on steps to improve information analysis and discuss the status of actions undertaken by the SIMS initiative.

  3. Remedial design/remedial action strategy report

    SciTech Connect (OSTI)

    Dieffenbacher, R.G.

    1994-06-30

    This draft Regulatory Compliance Strategy (RCS) report will aid the ER program in developing and implementing Remedial Design/Remedial Action (RD/RA) projects. The intent of the RCS is to provide guidance for the implementation of project management requirements and to allow the implementation of a flexible, graded approach to design requirements depending on the complexity, magnitude, schedule, risk, and cost for any project. The RCS provides a functional management-level guidance document for the identification, classification, and implementation of the managerial and regulatory aspects of an ER project. The RCS has been written from the perspective of the ER Design Manager and provides guidance for the overall management of design processes and elements. The RCS does not address the project engineering or specification level of detail. Topics such as project initiation, funding, or construction are presented only in the context in which these items are important as sources of information or necessary process elements that relate to the design project phases.

  4. Corrective Action Decision Document for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada: Revision 0

    SciTech Connect (OSTI)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-03-15

    This Corrective Action Decision Document (CADD) identifies and rationalizes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's selection of a recommended corrective action alternative appropriate to facilitate the closure of Corrective Action Unit (CAU) 528: Polychlorinated Biphenyls (PCBs) Contamination, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 25 of the NTS, CAU 528 consists of one Corrective Action Site (CAS): 25-27-03, Polychlorinated Biphenyls Surface Contamination. Corrective Action Unit 528 was created to address the presence of PCBs around the Test Cell C concrete pad. Corrective action investigation activities were performed from August 24, 2003, through January 8, 2004. The PCBs and total petroleum hydrocarbons-diesel range organics were identified as contaminants of concern in the surface and shallow subsurface soils in 12 areas (Areas 1 through 12) at CAS 25-27-03. Based on the review of existing data, future use, and current operations at the NTS, the following alternatives have been developed for consideration: Alternative 1 - No Further Action; Alternative 2 - Clean Closure; Alternative 3 - Closure in Place with Administrative Controls. The three corrective action alternatives were evaluated on their technical merits, focusing on performance, reliability, feasibility, and safety. Alternative 3 is the preferred corrective action for CAS 25-27-03. The selected alternative was judged to meet all requirements for the technical components evaluated for closure of the sites and additionally to minimize potential future exposure pathways to the contaminated media at CAU 528.

  5. Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada: Revision 0

    SciTech Connect (OSTI)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-04-06

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach for collecting the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 12 on the NTS, CAU 552 consists of two Corrective Action Sites (CASs): 12-06-04, Muckpile; 12-23-05, Ponds. Corrective Action Site 12-06-04 in Area 12 consists of the G-Tunnel muckpile, which is the result of tunneling activities. Corrective Action Site 12-23-05 consists of three dry ponds adjacent to the muckpile. The toe of the muckpile extends into one of the ponds creating an overlap of two CASs. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technic ally viable corrective actions. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  6. Alternative Fuels Data Center: Conversion Regulations

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Conversion Regulations to someone by E-mail Share Alternative Fuels Data Center: Conversion Regulations on Facebook Tweet about Alternative Fuels Data Center: Conversion Regulations on Twitter Bookmark Alternative Fuels Data Center: Conversion Regulations on Google Bookmark Alternative Fuels Data Center: Conversion Regulations on Delicious Rank Alternative Fuels Data Center: Conversion Regulations on Digg Find More places to share Alternative Fuels Data Center: Conversion Regulations on

  7. Smart Buildings: Business Case and Action Plan

    SciTech Connect (OSTI)

    Ehrlich, Paul; Diamond, Rick

    2009-04-01

    General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

  8. Request for Personnel Actions (For Managers and Adminstrative Officers)

    Broader source: Energy.gov [DOE]

    Headqaurters uses the CHRIS Workflow Tool to submit and process Personnel Actions. There is no longer a need for a hard copy Standard Form-52 (SF-52).  Each personnel action is approved via CHRIS...

  9. SEE Action Webinar Series on Behavior Programs and Strategies

    Broader source: Energy.gov [DOE]

    Hosted by the State and Local Energy Efficiency Action Network (SEE Action) Customer Information and Behavior Working Group, Anne Dougherty and Amanda Dwelley from Illume Advising will dive into issues around behavior programs and strategies in a three-part webinar series.

  10. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    SciTech Connect (OSTI)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  11. Step 4: Implement an Action Plan for Institutional Change

    Broader source: Energy.gov [DOE]

    Writing a good action plan is one thing; implementing it is another. Institutional change principles and methods can be incorporated into action plans (program design), but on-the-ground implementation activities must also be conducted in a manner that is suitable to the organizational context and the people in the roles being targeted.

  12. Implement an Institutional Change Action Plan for Sustainability

    Broader source: Energy.gov [DOE]

    Writing a good action plan is one thing; implementing it is another. Institutional change principles and methods can be incorporated into action plans (program design), but on-the-ground implementation activities must also be conducted in a manner that is suitable to the organizational context and the people in the roles being targeted.

  13. SEE Action Webinar on Energy Efficiency Measure Cost Studies

    Broader source: Energy.gov [DOE]

    Presented by State and Local Energy Efficiency Action Network (SEE Action), this webinar will explain the importance of measure cost studies, review the current "state of the science" of measure cost development and estimation, and explore opportunities for future collaboration and advancement of measure cost research.

  14. Institutional Change Process Step 4: Implement an Action Plan

    Broader source: Energy.gov [DOE]

    Writing a good action plan is one thing; implementing it is another. Institutional change principles and methods can be incorporated into action plans (program design), but on-the-ground implementation activities must also be conducted in a manner that is suitable to the organizational context and the people in the roles being targeted.

  15. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    \ ,.-c , 2 2 a. . FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM . ELIMINATION REPORT FOR THE FORMER GENERAL SERVICES ADMINISTRATION 39TH STREET WAREHOUSE 1716 PERSHING ROAD CHICAGO, ILLINOIS SEP301985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects __--... -_ -._.-_- _"_-. .___.. -... .._ ..-. .-. ..--- . , ' , CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological

  16. Alternatives/action plan report for outfall 17

    SciTech Connect (OSTI)

    1994-11-01

    This Document contains information pertaining to alternatives/action associated with controlling ammonia entering through outfall 17. This document identifies the location of contaminate source, the ammonia concentration levels entering East Fork Poplar Creek, and the action taken to reduce/eliminate the toxicity problem.

  17. ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE

    Office of Legacy Management (LM)

    ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE UNIVERSITY OF CHICAGO CONTAMINATED AS A RESULT OF PREVIOUS MED/AEC ACTIVITIES Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois December 1983 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee II-39 CONTENTS Page Summary of Proposed Action ....................... 1 Setting . . . . . . . . . . . . . . . . . . . . . . . .

  18. APPARATUS FOR REGULATING HIGH VOLTAGE

    DOE Patents [OSTI]

    Morrison, K.G.

    1951-03-20

    This patent describes a high-voltage regulator of the r-f type wherein the modulation of the r-f voltage is accomplished at a high level, resulting in good stabilization over a large range of load conditions.

  19. Environmental Regulations | Open Energy Information

    Open Energy Info (EERE)

    Regulations Jump to: navigation, search To do: add table This article is a stub. You can help OpenEI by expanding it. Retrieved from "http:en.openei.orgwindex.php?titleEnviron...

  20. Corrective Action Investigation plan for Corrective Action Unit 263: Area 25 Building 4839 Leachfield, Nevada Test Site, Nevada, March 1999

    SciTech Connect (OSTI)

    ITLV

    1999-03-01

    The Corrective Action Investigation Plan for Corrective Action Unit 263, the Area 25 Building 4839 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the US Department of Energy, Nevada Operations Office; the Nevada Division of Environmental Protection; and the US Department of Defense. Corrective Action Unit 263 is comprised of the Corrective Action Site 25-05-04 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). The Leachfield Work Plan was developed to streamline investigations at Leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 263. Corrective Action Unit 263 is located southwest of Building 4839, in the Central Propellant Storage Area. Operations in Building 4839 from 1968 to 1996 resulted in effluent releases to the leachfield and associated collection system. In general, effluent released to the leachfield consisted of sanitary wastewater from a toilet, urinal, lavatory, and drinking fountain located within Building 4839. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with the Building 4839 operations.

  1. Unique Auxin Regulation Mechanism Discovered

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Unique Auxin Regulation Mechanism Discovered Print The plant hormone auxin regulates many plant growth and development processes, including shoot growth, root branching, fruit ripening, tropisms, and flowering. But how such a simple molecule elicits such a variety of cellular responses has been a mystery. An important breakthrough came in 2005, wh en a conserved plant protein known as TIR1 (part of a protein destruction machinery system) was identified as a receptor for auxin. Now, an

  2. Federal Regulations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Regulations Federal Regulations keyboard-621831_960_720.jpg Cybersecurity Atomic Energy Act of 1954 (pdf) Computer Fraud and Abuse Act of 1986 Electronic Communications Privacy Act of 1986 Federal Information Security Management Act of 2002 (Title III of E-Gov) Homeland Security Act of 2002 (includes Cyber Security Act of 2002 and Critical Infrastructure Act of 2002) Uniting and Strengthening America by Providing Appropriate Tools Required to Intercept and Obstruct Terrorism Act Cyber

  3. Federal Regulations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Regulations Federal Regulations NOTE: Adobe Acrobat Reader may be necessary to view PDF documents listed below. Accessibility Section 508 of the Rehabilitation Act - Electronic and Information Technology Accessibility Standards Section 504 of the Rehabilitation Act - Nondiscrimination Under Federal Grants and Programs Federal Records Act Freedom of Information Act (as amended) Freedom of Information Act Updates Privacy Act of 1974 (as amended) Privacy Act Overview Cyber Security Atomic

  4. Unique Auxin Regulation Mechanism Discovered

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Unique Auxin Regulation Mechanism Discovered Print The plant hormone auxin regulates many plant growth and development processes, including shoot growth, root branching, fruit ripening, tropisms, and flowering. But how such a simple molecule elicits such a variety of cellular responses has been a mystery. An important breakthrough came in 2005, wh en a conserved plant protein known as TIR1 (part of a protein destruction machinery system) was identified as a receptor for auxin. Now, an

  5. Unique Auxin Regulation Mechanism Discovered

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Unique Auxin Regulation Mechanism Discovered Print The plant hormone auxin regulates many plant growth and development processes, including shoot growth, root branching, fruit ripening, tropisms, and flowering. But how such a simple molecule elicits such a variety of cellular responses has been a mystery. An important breakthrough came in 2005, wh en a conserved plant protein known as TIR1 (part of a protein destruction machinery system) was identified as a receptor for auxin. Now, an

  6. Unique Auxin Regulation Mechanism Discovered

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Unique Auxin Regulation Mechanism Discovered Print The plant hormone auxin regulates many plant growth and development processes, including shoot growth, root branching, fruit ripening, tropisms, and flowering. But how such a simple molecule elicits such a variety of cellular responses has been a mystery. An important breakthrough came in 2005, wh en a conserved plant protein known as TIR1 (part of a protein destruction machinery system) was identified as a receptor for auxin. Now, an

  7. Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Patrick Matthews

    2010-02-01

    Corrective Action Unit 374 is located in Areas 18 and 20 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 374 comprises the five corrective action sites (CASs) listed below: • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on October 20, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 374.

  8. Post regulation circuit with energy storage

    DOE Patents [OSTI]

    Ball, Don G.; Birx, Daniel L.; Cook, Edward G.

    1992-01-01

    A charge regulation circuit provides regulation of an unregulated voltage supply and provides energy storage. The charge regulation circuit according to the present invention provides energy storage without unnecessary dissipation of energy through a resistor as in prior art approaches.

  9. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Mark Krauss

    2011-09-01

    The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclear explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of the CASs were sufficient to meet the DQOs and evaluate CAAs without additional investigation. As a result, further investigation of the CAU 547 CASs was not required. The following CAAs were identified for the gas sampling assemblies: (1) clean closure, (2) closure in place, (3) modified closure in place, (4) no further action (with administrative controls), and (5) no further action. Based on the CAAs evaluation, the recommended corrective action for the three CASs in CAU 547 is closure in place. This corrective action will involve construction of a soil cover on top of the gas sampling assembly components and establishment of use restrictions at each site. The closure in place alternative was selected as the best and most appropriate corrective action for the CASs at CAU 547 based on the following factors: (1) Provides long-term protection of human health and the environment; (2) Minimizes short-term risk to site workers in implementing corrective action; (3) Is easily implemented using existing technology; (4) Complies with regulatory requirements; (5) Fulfills FFACO requirements for site closure; (6) Does not generate transuranic waste requiring offsite disposal; (7) Is consistent with anticipated future land use of the areas (i.e., testing and support activities); and (8) Is consistent with other NNSS site closures where contamination was left in place.

  10. Output-Based Regulations: A Handbook for Air Regulators (U.S...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Output-Based Regulations: A Handbook for Air Regulators (U.S. EPA), August 2004 Output-Based Regulations: A Handbook for Air Regulators (U.S. EPA), August 2004 The U.S. ...

  11. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    SciTech Connect (OSTI)

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department of Energy (DOE) determined that the degree of uncertainty in transport predictions for PSA remained unacceptably large. As a result, a second CAIP was developed by DOE and approved by the Nevada Division of Environmental Protection (NDEP) in December 1998 (DOE/NV, 1998a). This plan prescribed a rigorous analysis of uncertainty in the Shoal model and quantification of methods of reducing uncertainty through data collection. This analysis is termed a Data Decision Analysis (Pohll et al., 1999a) and formed the basis for a second major characterization effort at PSA (Pohll et al., 1999b). The details for this second field effort are presented in an Addendum to the CAIP, which was approved by NDEP in April 1999 (DOE/NV, 1999a). Four additional characterization wells were drilled at PSA during summer and fall of 1999; details of the drilling and well installation are in IT Corporation (2000), with testing reported in Mihevc et al. (2000). A key component of the second field program was a tracer test between two of the new wells (Carroll et al., 2000; Reimus et al., 2003). Based on the potential exposure pathways, two corrective action objectives were identified for CAU 447: Prevent or mitigate exposure to groundwater contaminants of concern at concentrations exceeding regulatory maximum contaminant levels or risk-based levels; and Reduce the risk to human health and the environment to the extent practicable. Based on the review of existing data, the results of the modeling, future use, and current operations at PSA, the following alternatives have been developed for consideration at CAU 447: Alternative 1--No Further Action; Alternative 2--Proof-of-Concept and Monitoring with Institutional Controls; and Alternative 3--Contaminant Control. The corrective action alternatives were evaluated based on the approach outlined in the ''Focused Evaluation of Selected Remedial Alternatives for the Underground Test Area'' (DOE/NV, 1998b). Each alternative was assessed against nine evaluation criteria. These criteria include overall protection of human health and the environment; compliance with appropriate requirements; long-term effectiveness; reduction of the toxicity, mobility, or volume of contamination; short-term effectiveness; implementability; cost; state acceptance; and community acceptance. Based on the results of this evaluation, the preferred alternative for CAU 447 is Alternative 2, Proof-of-Concept and Monitoring with Institutional Controls. The preferred corrective action alternative was chosen for its technical implementability, focusing on performance, reliability, feasibility, safety, and cost. Alternative 2 was judged to meet all requirements for the technical components evaluated and will control inadvertent exposure to contaminated groundwater at CAU 447.

  12. Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Alfred Wickline

    2009-04-01

    Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: 02-26-11, Lead Shot 02-44-02, Paint Spills and French Drain 02-59-01, Septic System 02-60-01, Concrete Drain 02-60-02, French Drain 02-60-03, Steam Cleaning Drain 02-60-04, French Drain 02-60-05, French Drain 02-60-06, French Drain 02-60-07, French Drain 23-60-01, Mud Trap Drain and Outfall 23-99-06, Grease Trap 25-60-04, Building 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: Move surface debris and/or materials, as needed, to facilitate sampling. Conduct radiological surveys. Perform field screening. Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. Collect samples of source material to determine the potential for a release. Collect samples of potential remediation wastes. Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

  13. EERE Announces Next Steps on President's Climate Action Plan

    Broader source: Energy.gov [DOE]

    On Friday, June 28, the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy hosted a webinar on the energy efficiency aspects of the President's Climate Action Plan. Rick Duke, Associate Director of the White House Council on Environmental Quality and the Domestic Policy Council, provided an overview of President Obama's comprehensive Climate Action Plan to cut the carbon pollution that causes climate change and threatens our health. The Department of Energy's Deputy Assistant Secretary for Energy Efficiency, Kathleen Hogan, provided a deeper dive into how EERE will implement the plan's action steps to cut energy waste in our homes, businesses, and factories. See the webinar slides.

  14. Fact Sheet: National Biofuels Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sheet: National Biofuels Action Plan Fact Sheet: National Biofuels Action Plan October 7, 2008 - 4:14pm Addthis In an effort to meet President Bush's "Twenty in Ten" goal and meet the Renewable Fuel Standard (RFS) targets in the Energy Independence and Security Act of 2007 (EISA) the Biomass Research and Development Board (the Board)-co-chaired by the U.S. Department of Agriculture (USDA) and the U.S. Department of Energy (DOE)-developed the National Biofuels Action Plan (NBAP) to

  15. Take Action to Save Energy at Home | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Residential Buildings » Take Action to Save Energy at Home Take Action to Save Energy at Home Whether you're a home builder or remodeling professional, a homeowner, home buyer, or renter, a state and local government, or a utility, the Buildings Technology Program and the Department of Energy (DOE) have resources to help you take action to save energy. Building or Buying a New Home DOE's Zero Energy Ready Home helps home buyers find builders who are committed to applying building science and

  16. EA-1595: Mitigation Action Plan | Department of Energy

    Energy Savers [EERE]

    Mitigation Action Plan EA-1595: Mitigation Action Plan Davis-Mead 230-kV Transmission Line Reconductor Project Western Area Power Administration proposes to reconductor approximately 61 miles of 230-kV transmission line from the Davis Substation at Davis Dam near Bullhead City, Arizona, to the Mead Substation near Boulder City in southern Nevada. PDF icon Mitigation Action Plan for the Davis-Mead 230-kV Transmission Line Reconductor Project, DOE/EA-1595 (November 2007) More Documents &

  17. Regulations, Guidelines and Codes and Standards | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety, Codes & Standards Current Approaches to Safety, Codes & Standards Regulations, Guidelines and Codes and Standards Regulations, Guidelines and Codes and Standards Many ...

  18. Alaska ADEC Wetlands Regulation | Open Energy Information

    Open Energy Info (EERE)

    Wetlands Regulation Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Alaska ADEC Wetlands Regulation Author Alaska Division of Water Published Alaska...

  19. Fish Habitat Regulations | Open Energy Information

    Open Energy Info (EERE)

    Fish Habitat Regulations Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Fish Habitat Regulations Author Alaska Department of Fish & Game Published...

  20. International Electricity Regulation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulation International Electricity Regulation U.S. trade in electric energy with Canada and Mexico is rising, bringing economic and reliability benefits to the United States and ...

  1. ISOs: The new antitrust regulators?

    SciTech Connect (OSTI)

    Raskin, D.B.

    1998-04-01

    Fear of seller market power in emerging electricity markets has led regulators to sanction use of independent system operators as private market police. A more restrained approach is likely to yield better results without the chilling effects of private regulation. This new industry regulatory paradigm has received little critical attention to date. This is unfortunate because ISO antitrust regulation raises serious legal and policy concerns. The California and New England Power Pool (NEPOOL) plans are quite intrusive. They require the ISO to make difficult distinctions between acceptable and unacceptable market behavior. They create considerable risk that desirable competitive behavior will be chilled and that market participants will incur significant explicit and implicit costs to meet regulatory requirements.

  2. Mitigation Action Plan: Lease of Parcel ED-1 of the Oak Ridge Reservation by the East Tennessee Economic Council

    SciTech Connect (OSTI)

    1996-04-01

    In April 1996, the U.S. Department of Energy (DOE) completed an environmental assessment (EA) (DOE/EA-1113) for the proposed lease of 957-16 acres (Parcel ED-1) of the Oak Ridge (Tennessee) Reservation (ORR) by the East Tennessee Economic Council (ETEC) for industrial development. DOE plans to issue a Finding of No Significant Impact (FONSI) for the proposed action, conditional upon the implementation of mitigation and monitoring to protect environmental resources. According to DOE`s National Environmental Policy Act (NEPA) regulations (10 CFR 1021.322), a FONSI shall include {open_quotes}any commitments to mitigations that are essential to render the impacts of the proposed action not significant, beyond those mitigations that are integral elements of the proposed action, and a reference to the Mitigation Action Plan prepared under 10 CTR 1021.331{close_quotes}. Terms of the lease offer DOE the option of terminating the lease with ETEC should the lessee and/or sublessees fail to implement the mitigation defined in the FONSI.

  3. Corrective Action Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada

    SciTech Connect (OSTI)

    D. L. Gustafason

    2001-02-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order of 1996. This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 2000). The CAU includes two Corrective Action Sites (CASs): 25-23-09, Contaminated Waste Dump Number 1; and 25-23-03, Contaminated Waste Dump Number 2. Investigation of CAU 143 was conducted in 1999. Analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine constituents of concern for CAU 143. Radionuclide concentrations in disposal pit soil samples associated with the Reactor Maintenance, Assembly, and Disassembly Facility West Trenches, the Reactor Maintenance, Assembly, and Disassembly Facility East Trestle Pit, and the Engine Maintenance, Assembly, and Disassembly Facility Trench are greater than normal background concentrations. These constituents are identified as constituents of concern for their respective CASs. Closure-in-place with administrative controls involves use restrictions to minimize access and prevent unauthorized intrusive activities, earthwork to fill depressions to original grade, placing additional clean cover material over the previously filled portion of some of the trenches, and placing secondary or diversion berm around pertinent areas to divert storm water run-on potential.

  4. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.:0

    SciTech Connect (OSTI)

    Wickline, Alfred

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting corrective action alternatives.

  5. Used oil and its regulation in the United States. Master's thesis

    SciTech Connect (OSTI)

    Ledbetter, G.H.

    1988-09-30

    The Environmental Protection Agency (EPA) took the first significant steps toward the federal regulation of waste and used oil by: (1) promulgating the final rule for the Burning of Waste Fuel and Used Oil Fuel in Boilers and Industrial Furnaces; (2) proposing a rule to establish standards for used oil which is recycled; and (3) proposing a rule to amend the regulations for hazardous waste management under Subtitle C of the Resource Conservation and Recovery Act (hereafter referred to as RCRA) by listing used oil as a hazardous waste. These efforts by EPA are particularly interesting because of both the nature of the prodding from Congress it took to obtain EPA action and the unprecedented volume, degree, and breadth of public opposition these actions generated once taken.

  6. Recapture of intangible drilling and development costs: a discussion of the proposed regulations

    SciTech Connect (OSTI)

    Roe, S. L.

    1981-06-01

    Controversy over proposed Internal Revenue Service (IRS) regulations for Section 1254 of the Tax Reform Act of 1976 stem from a difference in interpretation. Comparisons of the new rules with current industry practices cover taxes on the income from recapture, the definition of terms related to the costs of drilling both productive and nonproductive geothermal wells, partnerships and partial interests, installment sales, and the exceptions and other adjustment rules. Congressional action may be necessary to resolve some of the technical differences outlined. Tax practitioners and taxpayers must determine, in the meantime, whether to comply with the proposed regulations even though they conflict with Section 1254 and with congressional intent. (DCK)

  7. Develop an Institutional Change Action Plan for Sustainability

    Broader source: Energy.gov [DOE]

    After establishing a goal and assessing the rules, roles, and tools, federal agencies can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and sustainability goals).

  8. Bureau of Land Management - Techniques for Documenting a No Action...

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - Techniques for Documenting a No Action Alternative in an EA Abstract This page...

  9. EA-1934: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This Mitigation Action Plan is an integral part of the Finding of No Significant Impact ... borrow source. This MAP includes all the integral elements and commitments made in the EA ...

  10. EA-1636: Mitigation Action Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Burnt Woods and Santiam-Toledo Pole Replacement Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and...

  11. Directory of Potential Stakeholders for DOE Actions under NEPA

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE Offices are encouraged to be inclusive in providing potentially interested parties with opportunities to review NEPA documents.  This Directory of Potential Stakeholders for DOE Actions under...

  12. AP-XPS Measures MIEC Oxides in Action

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AP-XPS Measures MIEC Oxides in Action Print Oxide materials with mixed ionic-electronic conductivity (MIEC) can conduct both electrons and oxygen ions. MIEC oxides have broad...

  13. AP-XPS Measures MIEC Oxides in Action

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Measures MIEC Oxides in Action Print Wednesday, 25 May 2011 00:00 Oxide materials with mixed ionic-electronic conductivity (MIEC) can conduct both electrons and oxygen ions....

  14. SEE Action Webinar on Community-Based Social Marketing

    Broader source: Energy.gov [DOE]

    Hosted by the State and Local Energy Efficiency Action Network, this webinar will describe community-based social marketing as a behavior-based approach for developing energy efficiency programs.

  15. National Action Plan Vision for 2025: A Framework for Change

    SciTech Connect (OSTI)

    National Action Plan for Energy Efficiency

    2008-11-01

    Establishes a goal of achieving all cost-effective energy efficiency by 2025 and presents 10 implementation goals as a framework for advancing the National Action Plans key policy recommendations.

  16. EIS-0332: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    kV transmission line between Bonneville Power Administration's existing McNary and John Day substations. PDF icon DOEEIS-0332: Mitigation Action Plan for the McNary-John Day...

  17. EA-1934: 2014 Annual Report for Mitigation Action Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford Site, Richland, Washington This annual report provides a summary of DOEEA-1934 Mitigation Action Plan implementation in calendar year 2014. PDF icon EA-1934-FEA-MAP-2014...

  18. UC-70A Formerly Utilized Sites Remedial Action Program (FUSRAP...

    Office of Legacy Management (LM)

    F. a% .":,,. .-+smiii"-l ," .-. I ,a ,' , *p2 - QRkl oR,o DOEOR20722- 29 UC-70A Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. ...

  19. Institutional Change Process Step 3: Develop an Action Plan

    Broader source: Energy.gov [DOE]

    After establishing a goal and assessing the rules, roles, and tools, federal agencies can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and sustainability goals).

  20. Corrective Action Plan Addressing the Accident Investigation Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Corrective Action Plan Addressing the Accident Investigation Report of the February 5, 2014 Fire Event and the February 14, 2014 Radiological Release Event, Rev 1 Page 2 of 89 Table of Contents 1 Purpose ................................................................................................................................................................................................ 7 2 Summary of the

  1. EAC Recommendations for DOE Action Regarding the Race to the...

    Broader source: Energy.gov (indexed) [DOE]

    the Race to the Top Initiative, approved at the June 5-6, 2013 EAC Meeting. EAC Recommendations for DOE Action on the Race to the Top Initiative - June 6, 2013 More Documents &...

  2. Ecology Action: Small Market Advanced Retrofit Transformation Program (SMART)

    Broader source: Energy.gov [DOE]

    Lead Performer: Ecology Action – Santa Cruz, CA Partners: - New Buildings Institute – Portland, OR - Electric and Gas Industries Association (EGIA) – Sacramento, CA - Pacific Gas and Electric – San Francisco, CA - Sacramento Municipal Utility District – Sacramento, CA

  3. US-Japan_NuclearEnergyActionPlan.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    US-Japan_NuclearEnergyActionPlan.pdf US-Japan_NuclearEnergyActionPlan.pdf PDF icon US-Japan_NuclearEnergyActionPlan.pdf More Documents & Publications Fact Sheet: United States-Japan Joint Nuclear Energy Action Plan United States -Japan Joint Nuclear Energy Action Plan Slide 1

  4. Enforcement actions: Significant actions resolved reactor licensees. Quarterly progress report, October--December 1994, Volume 13, No. 4, Part 1

    SciTech Connect (OSTI)

    1995-02-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October--December 1994) and includes copies of letters Notices, and Orders sent by the Nuclear Regulatory Commission to reactor licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  5. Enforcement actions: Significant actions resolved medical licensees. Quarterly progress report, January 1995--March 1995. Volume 14, No. 1, Part 2

    SciTech Connect (OSTI)

    1995-05-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (January-March 1995) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to medical licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  6. Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Matthews, Patrick

    2014-05-01

    Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

  7. Enforcement actions: Significant actions resolved, reactor licensees. Semiannual progress report, January--June 1997; Volume 16, Number 1, Part 2

    SciTech Connect (OSTI)

    1997-09-01

    This compilation summarizes significant enforcement actions that have been resolved during the period (January--June 1997) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to reactor licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  8. Urgent Action on Energy Conservation Standards for Residential Water

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Heaters (Docket Number: EERE-2012-BT-STD-0022) | Department of Energy Urgent Action on Energy Conservation Standards for Residential Water Heaters (Docket Number: EERE-2012-BT-STD-0022) Urgent Action on Energy Conservation Standards for Residential Water Heaters (Docket Number: EERE-2012-BT-STD-0022) I am submitting this letter on behalf of PJM Interconnection, the electric grid operator for 13 states and the District of Columbia serving over 60 million people. As part of a coalition which

  9. Environmental Management Los Alamos Field Office Corrective Action Plan -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radiological Release Phase II | Department of Energy Los Alamos Field Office Corrective Action Plan - Radiological Release Phase II Environmental Management Los Alamos Field Office Corrective Action Plan - Radiological Release Phase II On March 22, 2015, the Department of Energy established an Environmental Management Los Alamos Field Office (EM-LA) responsible for management of the environmental restoration and the legacy waste management programs at Los Alamos National Laboratory (LANL).

  10. Executive Order 13212 - Actions To Expedite Energy-Related Projects:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Register Notice Volume 66, No. 99 - May 18, 2001 | Department of Energy Executive Order 13212 - Actions To Expedite Energy-Related Projects: Federal Register Notice Volume 66, No. 99 - May 18, 2001 Executive Order 13212 - Actions To Expedite Energy-Related Projects: Federal Register Notice Volume 66, No. 99 - May 18, 2001 The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people. In general, it

  11. Climate Action Champions: Blue Lake Rancheria Tribe, CA | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Blue Lake Rancheria Tribe, CA Climate Action Champions: Blue Lake Rancheria Tribe, CA The Blue Lake Rancheria, California, a federally recognized Native American tribal Government and community, is located on over 100 acres of land spanning the scenic Mad River in northwestern California. In its operational strategy, the Tribe has implemented the ‘seven generations’ philosophy, where actions taken today will have a positive impact for seven generations to come. This results

  12. Climate Action Champions: Oberlin, OH | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oberlin, OH Climate Action Champions: Oberlin, OH Oberlin, Ohio, is a small town south of Lake Erie with a nationally significant history. It is home to Oberlin College, a liberal arts college and music conservatory. | Photo courtesy of the City of Oberlin. Oberlin, Ohio, is a small town south of Lake Erie with a nationally significant history. It is home to Oberlin College, a liberal arts college and music conservatory. | Photo courtesy of the City of Oberlin. Climate Action Progress and Plans

  13. Climate Action Champions: San Francisco, CA | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    San Francisco, CA Climate Action Champions: San Francisco, CA To meet the challenge of climate change, San Francisco is working with residents, businesses, community organizations, and state and federal agencies to create innovative programs and policies. To meet the challenge of climate change, San Francisco is working with residents, businesses, community organizations, and state and federal agencies to create innovative programs and policies. Climate Action Progress and Plans San Francisco

  14. Overview of the State and Local Energy Efficiency Action Network

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Overview of the State and Local Energy Efficiency Action Network Johanna Zetterberg Coordinator, SEE Action Network US Department of Energy Achieving the Potential * EE remains one of the most cost effective 1 ways to address challenges - High consumer energy prices - Fuel price volatility - Transmission and distribution infrastructure expansion costs - Localized system reliability - Environmental and public health costs of GHGs and air pollution - National energy security and independence *

  15. PEPCO Comments on Special Environmental Analysis For Actions Taken Under

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia | Department of Energy PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the

  16. Unified Procedures Applicable to Major Federal Actions Relating to Nuclear

    Energy Savers [EERE]

    Activities Subject to Executive Order 12114 (State Department, 1979) | Department of Energy Unified Procedures Applicable to Major Federal Actions Relating to Nuclear Activities Subject to Executive Order 12114 (State Department, 1979) Unified Procedures Applicable to Major Federal Actions Relating to Nuclear Activities Subject to Executive Order 12114 (State Department, 1979) The following unified procedures issued by the State Department are established to satisfy the requirement of the

  17. DOE Announces Additional Energy Efficiency Enforcement Action to Protect

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consumers | Department of Energy Energy Efficiency Enforcement Action to Protect Consumers DOE Announces Additional Energy Efficiency Enforcement Action to Protect Consumers January 7, 2010 - 12:00am Addthis Washington, DC - The Department of Energy announced today that it has entered into a Consent Decree with Haier America resolving an investigation into whether Haier violated DOE's energy efficiency standards. DOE's investigation led Haier to determine that a parts defect caused certain

  18. DOE FACT SHEET: CLIMATE ACTION CHAMPION TECHNICAL ASSISTANCE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE FACT SHEET: CLIMATE ACTION CHAMPION TECHNICAL ASSISTANCE Blue Lake Rancheria Energy Performance Assessment Overview The Blue Lake Rancheria Tribe (BLR) was recognized as a Climate Action Champion (CAC) by The White House and the Department of Energy (DOE) in December 2014. In 2015, DOE released a Notice of Technical Assistance (NOTA) to provide CACs with additional opportunities for financial and technical assistance to support and advance their greenhouse gas emissions reduction and climate

  19. 2012 National Energy Assurance Planning Conference After-Action Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (August 2012) | Department of Energy Energy Assurance Planning Conference After-Action Report (August 2012) 2012 National Energy Assurance Planning Conference After-Action Report (August 2012) On June 28-29, 2012, the Department of Energy, in coordination with the National Association of State Energy Officials (NASEO), held the National Energy Assurance Planning Conference. The conference culminated three years of DOE's ongoing American Recovery and Reinvestment Act of 2009 (ARRA) State and

  20. Energy Department Announces Two New Actions to Spur Clean Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manufacturing Growth and Innovation | Department of Energy Two New Actions to Spur Clean Energy Manufacturing Growth and Innovation Energy Department Announces Two New Actions to Spur Clean Energy Manufacturing Growth and Innovation September 15, 2015 - 2:02pm Addthis Today, the Energy Department announced new research and development (R&D) efforts as part of the Department's Clean Energy Manufacturing Initiative (CEMI). These two efforts-a national laboratory-industry collaboration