Sample records for action involves installation

  1. Ranacyclins, a New Family of Short Cyclic Antimicrobial Peptides: Biological Function, Mode of Action, and Parameters Involved in Target Specificity,,@

    E-Print Network [OSTI]

    Pompeu Fabra, Universitat

    of Action, and Parameters Involved in Target Specificity,,@ M. Luisa Mangoni, Niv Papo,§ Giuseppina Mignogna

  2. Nuclear Decommissioning and Organisational Reliability: Involving Subcontractors in Collective Action

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Page 1 Nuclear Decommissioning and Organisational Reliability: Involving Subcontractors to the decommissioning. The use of subcontractors is not new; in the nuclear industry it became widespread in the 1990s reliability is at the heart of the safety of at-risk systems. Many studies have been conducted in the nuclear

  3. Emergency Action Plan For incidents involving hazardous materials, fires, explosions, or natural gas

    E-Print Network [OSTI]

    Mojzsis, Stephen J.

    -492-6025. For Non-Emergency Fire and Natural Gas Questions call the CU Fire Marshall @ 303-492-4042. AdditionalEmergency Action Plan For incidents involving hazardous materials, fires, explosions, or natural gas leaks, the following actions should be taken: 1) Life Safety First 2) Evacuate Immediate Area 3

  4. Well Installation Report for Corrective Action Unit 443, Central Nevada Test Area, Nye County, Nevada, Rev. No.: 0

    SciTech Connect (OSTI)

    Tim Echelard

    2006-01-01T23:59:59.000Z

    A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites, Corrective Action Unit 443'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first phase involved the gathering and interpretation of geologic and hydrogeologic data, and inputting the data into a three-dimensional numerical model to depict groundwater flow. The output from the groundwater flow model was used in a transport model to simulate the migration of a radionuclide release (Pohlmann et al., 2000). The second phase of modeling (known as a Data Decision Analysis [DDA]) occurred after NDEP reviewed the first model. This phase was designed to respond to concerns regarding model uncertainty (Pohll and Mihevc, 2000). The third phase of modeling updated the original flow and transport model to incorporate the uncertainty identified in the DDA, and focused the model domain on the region of interest to the transport predictions. This third phase culminated in the calculation of contaminant boundaries for the site (Pohll et al., 2003). Corrective action alternatives were evaluated and an alternative was submitted in the ''Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface'' (NNSA/NSO, 2004). Based on the results of this evaluation, the preferred alternative for CAU 443 is Proof-of-Concept and Monitoring with Institutional Controls. This alternative was judged to meet all requirements for the technical components evaluated and will control inadvertent exposure to contaminated groundwater at CAU 443.

  5. Structural Code Considerations for Solar Rooftop Installations.

    SciTech Connect (OSTI)

    Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

    2014-12-01T23:59:59.000Z

    Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

  6. Photovoltaic Installations at Williams College Ruth Aronoff

    E-Print Network [OSTI]

    Aalberts, Daniel P.

    generation using solar power. Photovoltaic (PV) panel installations are a simple way for the College facilities, it is now evaluating in detail the environmental impact of these actions. In addition to making1 Photovoltaic Installations at Williams College Ruth Aronoff Williams Luce Project SUMMARY

  7. Client Configuration and Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Installation HSI Configuration and Installation Configuration Instructions This distribution has default configuration settings which will work for most environments. If...

  8. SMART Wind Consortium Virtual Meeting on Installation: Reducing...

    Broader source: Energy.gov (indexed) [DOE]

    foster dialogue on actions to improve safety and efficiency and to reduce installation costs for distributed wind turbines. Gary Harcourt of Great Rock Windpower will discuss the...

  9. Microsoft Word - CX-Ashe-CGSFiberInstallation_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    5, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Debbie Ruckwardt Electrical Engineer - TEP-CSB-1 Proposed Action: Installing fiber optic cables between...

  10. Sandia Energy - Installation Energy Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Installation Energy Security Home Stationary Power Grid Modernization Resilient Electric Infrastructures Military Installation Energy Security Installation Energy SecurityTara...

  11. Installation and Acceptance Stage

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-05-21T23:59:59.000Z

    This chapter addresses activities required to install the software, data bases, or data that comprise the software product onto the hardware platform at sites of operation.

  12. HVAC Installed Performance

    Broader source: Energy.gov [DOE]

    This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question ŤHVAC proper installation energy savings: over-promising or under-delivering?"

  13. VAX/ASPEN installation guide

    SciTech Connect (OSTI)

    Williams, K.E.

    1984-11-01T23:59:59.000Z

    Information necessary to install the ASPEN computerized simulation program on the VAX system is provided.

  14. Sandia Energy - Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Scienceand RequirementsCoatingsUltra-High-VoltagePower Company'sInAs QuantumInstallation Home

  15. berkeleyengineering First-generation airbags, installed in motor

    E-Print Network [OSTI]

    Agogino, Alice M.

    berkeleyengineering 8 9 First-generation airbags, installed in motor vehicles until 1998, decreased Berkeley ME professor Alice Agogino, is because women were not involved in early research, in which airbags

  16. Enhanced Control Installations.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    correctness. Title: Individual Permit, High Priority Sites, Examples of Enhanced Control Installations, Poster, Individual Permit for Storm Water, NPDES Permit No. NM0030759...

  17. Safety Culture in Nuclear Installations

    Broader source: Energy.gov [DOE]

    IAEA-TECDOC-1329 Safety Culture in Nuclear Installations, Guidance for use in the Enhancement of Safety Culture, International Atomic Energy Agency IAEA, December 2002.

  18. Transforming PV Installations toward Dispatchable, Schedulable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transforming PV Installations toward Dispatchable, Schedulable Energy Solutions Transforming PV Installations toward Dispatchable, Schedulable Energy Solutions Advanced Energy...

  19. Preliminary assessment report for Camp Swift Military Reservation, Installation 48070, Bastrop County, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.B.

    1993-08-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard property in Bastrop County, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Camp Swift property, the requirement of the Department of Defense Installation Restoration Program (IRP). The review of both historical and current practices at the property indicated that the activities at Camp Swift include no operations considered to have an adverse impact to the environment. The recommendation, therefore, is that no further IRP action is necessary at this property.

  20. Installation and Commissioning Automated Demand Response Systems

    SciTech Connect (OSTI)

    Global Energy Partners; Pacific Gas and Electric Company; Kiliccote, Sila; Kiliccote, Sila; Piette, Mary Ann; Wikler, Greg; Prijyanonda, Joe; Chiu, Albert

    2008-04-21T23:59:59.000Z

    Demand Response (DR) can be defined as actions taken to reduce electric loads when contingencies, such as emergencies and congestion, occur that threaten supply-demand balance, or market conditions raise supply costs. California utilities have offered price and reliability DR based programs to customers to help reduce electric peak demand. The lack of knowledge about the DR programs and how to develop and implement DR control strategies is a barrier to participation in DR programs, as is the lack of automation of DR systems. Most DR activities are manual and require people to first receive notifications, and then act on the information to execute DR strategies. Levels of automation in DR can be defined as follows. Manual Demand Response involves a labor-intensive approach such as manually turning off or changing comfort set points at each equipment switch or controller. Semi-Automated Demand Response involves a pre-programmed demand response strategy initiated by a person via centralized control system. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. The receipt of the external signal initiates pre-programmed demand response strategies. We refer to this as Auto-DR (Piette et. al. 2005). Auto-DR for commercial and industrial facilities can be defined as fully automated DR initiated by a signal from a utility or other appropriate entity and that provides fully-automated connectivity to customer end-use control strategies. One important concept in Auto-DR is that a homeowner or facility manager should be able to 'opt out' or 'override' a DR event if the event comes at time when the reduction in end-use services is not desirable. Therefore, Auto-DR is not handing over total control of the equipment or the facility to the utility but simply allowing the utility to pass on grid related information which then triggers facility defined and programmed strategies if convenient to the facility. From 2003 through 2006 Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) developed and tested a series of demand response automation communications technologies known as Automated Demand Response (Auto-DR). In 2007, LBNL worked with three investor-owned utilities to commercialize and implement Auto-DR programs in their territories. This paper summarizes the history of technology development for Auto-DR, and describes the DR technologies and control strategies utilized at many of the facilities. It outlines early experience in commercializing Auto-DR systems within PG&E DR programs, including the steps to configure the automation technology. The paper also describes the DR sheds derived using three different baseline methodologies. Emphasis is given to the lessons learned from installation and commissioning of Auto-DR systems, with a detailed description of the technical coordination roles and responsibilities, and costs.

  1. Magnet Girder Assembly and Installation

    SciTech Connect (OSTI)

    None

    2012-12-12T23:59:59.000Z

    It takes teamwork to assemble and install magnet girders for the storage ring of the National Synchrotron Light Source II. NSLS-II is now under construction at Brookhaven Lab.

  2. Magnet Girder Assembly and Installation

    ScienceCinema (OSTI)

    None

    2013-07-17T23:59:59.000Z

    It takes teamwork to assemble and install magnet girders for the storage ring of the National Synchrotron Light Source II. NSLS-II is now under construction at Brookhaven Lab.

  3. Net Zero Energy Installations (Presentation)

    SciTech Connect (OSTI)

    Booth, S.

    2012-05-01T23:59:59.000Z

    A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

  4. Solar Installation Labor Market Analysis

    SciTech Connect (OSTI)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01T23:59:59.000Z

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  5. Process Improvement at Army Installations 

    E-Print Network [OSTI]

    Northrup, J.; Smith, E. D.; Lin, M.; Baird, J.

    1997-01-01T23:59:59.000Z

    ). Executive Orders require the Army to reduce the use of energy and related environmental impacts by promoting renewable energy technologies. These new energy and environmental directives usually exceed the performance capabilities of DODs currently installed...

  6. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    Office of Energy Efficiency and Renewable Energy (EERE)

    In 2008, DoD and DOE defined a joint initiative to address military energy use by identifying specific actions to reduce energy demand and increase use of renewable energy on DoD installations.

  7. Microsoft Word - CX-RossComplexComcastFiberInstall_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    1 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Dawneen Dostert Realty Specialist - TERR-LMT Proposed Action: Allow installation of new fiber optic cable PP&A...

  8. Data Mining using Python --exercises for installation

    E-Print Network [OSTI]

    ipython (e.g., by pip) Start with: ipython -pylab Once installed make sure you can write: In [1]: plot for installation Install IPython Notebook Check that you can run a IPython Notebook file. Test that the IPython

  9. Preliminary assessment report for Fort Custer Training Center, Installation 26035, Augusta, Michigan. Installation Restoration Program

    SciTech Connect (OSTI)

    Flaim, S.; Krokosz, M.

    1993-08-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Michigan Army National Guard property near Augusta, Michigan. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Custer Training Center, phase I of the Department of Defense Installation Restoration Program. The environmentally significant operations associated with the property are (1) storage of hazardous materials and hazardous waste, (2) storage and dispensing of fuel, (3) washing of vehicles and equipment, and (4) weapons training ranges that may have accumulated lead.

  10. Preliminary assessment report for Fort Jacob F. Wolters, Installation 48555, Mineral Wells, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.B.

    1993-08-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (TXARNG) property near Mineral Wells, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Wolters property, the requirement of the Department of Defense Installation Restoration Program.

  11. Preliminary assessment report for National Guard Facility, Installation 25255, Rehoboth, Massachusetts. Installation Restoration Program

    SciTech Connect (OSTI)

    Haffenden, R.; Flaim, S.; Krokosz, M.

    1993-08-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Massachusetts Army National Guard (MAARNG) property known as the Rehoboth National Guard Facility (RNGF) in Rehoboth, Massachusetts. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for ftirther action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the RNGF property, phase I of the Department of Defense Installation Restoration Program (IRP). The scope of this assessment is limited to the facilities under the control of the MAARNG and the past activities contained within that area.

  12. Installation and Commissioning Automated Demand Response Systems

    E-Print Network [OSTI]

    Kiliccote, Sila; Global Energy Partners; Pacific Gas and Electric Company

    2008-01-01T23:59:59.000Z

    al: Installation and Commissioning Automated Demand ResponseConference on Building Commissioning: April 22 – 24, 2008al: Installation and Commissioning Automated Demand Response

  13. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  14. Preliminary assessment report for Olney Military Reservation, Installation 24175, Olney, Maryland. Installation Restoration Program

    SciTech Connect (OSTI)

    Hansen, J.; Rose, C.

    1993-07-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Maryland Army National Guard property near Olney, Maryland. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies Phase I of the US Department of Defense Installation Restoration Program for Olney Military Reservation property. Olney Military Reservation is an 8-acre site located in the southwestern portion of Maryland, about six miles northwest of Washington, DC, in Montgomery County. The major facilities included in this PA comprise the administration building, barracks, and motor repair shops. The environmentally significant operations associated with the property are underground and aboveground storage tanks, a vehicle wash rack, a flammable materials storage area (a lean-to structure), and a hazardous materials storage building. The review of both historical and current practices at the property indicates that Olney Military Reservation property poses no immediate threat to human health or the environment. Argonne`s reviewers noted several historical potential threats to the environment that have occurred at the property that installation personnel have corrected or eliminated.

  15. Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn Other NewsSpin and Frame ofHowIG-0464the research

  16. Operation manual Installation Category I

    E-Print Network [OSTI]

    Kleinfeld, David

    Cary 50 Hardware Operation manual Installation Category I Pollution Degree 2 Safety Class 3 (EN-2:1991 IEC 801-3:1984 IEC 801-4:1988 Equipment Model Number Cary 50 Series Responsible Person in the EUUV software 4-13 5 Spare parts 5-1 #12;Cary 50 Publication date: 06/99 vii Safety practices and hazards Your

  17. Corrective Action

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Corrective Action Individual Permit: Corrective Action Certifications If confirmation monitoring sample results demonstrate that one or more TALs are exceeded at a Site, the...

  18. Renewable Energy Opportunities at the Kanto Installations, Japan

    SciTech Connect (OSTI)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-09-24T23:59:59.000Z

    This document provides an overview of renewable resource development potential at the U.S. Army installations in the Kanto region in Japan, which includes Camp Zama, Yokohama North Dock, Sagamihara Family Housing Area (SFHA), Sagami General Depot, and Akasaka Press Center. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the Huntsville Army Corps of Engineers, and includes the development of a methodology for renewable resource assessment at Army installations located on foreign soil. The methodology is documented in Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations. The site visit to the Kanto installations took place on April 5 and 6, 2010. At the current time, there are some renewable technologies that show economic potential. Because of siting restrictions and the small size of these installations, development of most renewable energy technologies will likely be limited to Camp Zama. Project feasibility is based on installation-specific resource availability and energy costs and projections based on accepted life-cycle cost methods. Development of any renewable energy project will be challenging, as it will require investigation into existing contractual obligations, new contracts that could be developed, the legality of certain partnerships, and available financing avenues, which involves the U.S. Forces Japan (USFJ), the Government of Japan (GOJ), and a number of other parties on both sides. The Army will not be able to implement a project without involvement and approval from the other services and multiple levels of Japanese government. However, implementation of renewable energy projects could be an attractive method for GOJ to reduce greenhouse gas emissions and lower annual utility payments to USFJ. This report recommends projects to pursue and offers approaches to use. The most promising opportunities include waste-to-energy and ground source heat pumps. Solar photovoltaics (PV) may also prove successful. Other resources were found to be insufficient on the Kanto installations.

  19. Process Improvement at Army Installations

    E-Print Network [OSTI]

    Northrup, J.; Smith, E. D.; Lin, M.; Baird, J.

    recommendations are for the Fill and Press line where most of the Level I focused LESSONS LEARNED On completion of the project, the researchers assessed the results and some of the 198 ESL-IE-97-04-31 Proceedings from the Nineteenth Industrial Energy.... Finally, the energy issues included initiate an energy team; install energy efficient lighting; and decommission unused steam lines. After the first cost, savings, and simple payback time was calculated for all of the proposed improvements, a...

  20. Parent Involvement

    E-Print Network [OSTI]

    Howard, Jeff W.

    2005-05-10T23:59:59.000Z

    To be successful, a 4-H program must have parent involvement. Although 4-H leaders and Extension agents may interest young people in becoming members, they need the parents' goodwill and support to keep them interested, enthusiastic and active. Here...

  1. STATE OF CALIFORNIA REFRIGERATED WAREHOUSE INSTALLATION CERTIFICATE

    E-Print Network [OSTI]

    STATE OF CALIFORNIA REFRIGERATED WAREHOUSE INSTALLATION CERTIFICATE CEC-RWH-INST (Revised 08 # BUILDING TYPE Refrigerated Warehouse PHASE OF CONSTRUCTION New Construction Addition Alteration If more By the Enforcement Agency #12;STATE OF CALIFORNIA REFRIGERATED WAREHOUSE INSTALLATION CERTIFICATE CEC

  2. Automated solar collector installation design

    DOE Patents [OSTI]

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2014-08-26T23:59:59.000Z

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

  3. Sandia Energy - Installation Energy Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Scienceand RequirementsCoatingsUltra-High-VoltagePower Company'sInAs QuantumInstallation

  4. Empirically Derived Strength of Residential Roof Structures for Solar Installations.

    SciTech Connect (OSTI)

    Dwyer, Stephen F.; Sanchez, Alfred; Campos, Ivan A.; Gerstle, Walter H.

    2014-12-01T23:59:59.000Z

    Engineering certification for the installation of solar photovoltaic (PV) modules on wood roofs is often denied because existing wood roofs do not meet structural design codes. This work is intended to show that many roofs are actually sufficiently strong given the conservatism in codes, documented allowable strengths, roof structure system effects, and beam composite action produced by joist-sheathing interaction. This report provides results from a testing program to provide actual load carrying capacity of residential rooftops. The results reveal that the actual load carrying capacity of structural members and systems tested are significantly stronger than allowable loads provided by the International Residential Code (IRC 2009) and the national structural code found in Minimum Design Loads for Buildings and Other Structures (ASCE 7-10). Engineering analysis of residential rooftops typically ignores the system affects and beam composite action in determining rooftop stresses given a potential PV installation. This extreme conservatism combined with conservatism in codes and published allowable stress values for roof building materials (NDS 2012) lead to the perception that well built homes may not have adequate load bearing capacity to enable a rooftop PV installation. However, based on the test results presented in this report of residential rooftop structural systems, the actual load bearing capacity is several times higher than published values (NDS 2012).

  5. Adaptive Optics Installation and Operation

    E-Print Network [OSTI]

    light passes through a 6 mm thick plane parallel plate that can be tilted by the action of two geared, or change in magnification. Our testing has verified these results. The window is AR coated with the same high quality coating on our ST chamber window, and has less than 1% reflection per surface from 400

  6. Departments of Energy, Defense Partner to Install Fuel Cell Backup...

    Office of Environmental Management (EM)

    Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at...

  7. The Nuclear Installations (Dangerous Occurrences) Regulations 1965 

    E-Print Network [OSTI]

    Lee, Fred; Ross, William

    1965-01-01T23:59:59.000Z

    STATUTORY INSTRUMENTS 1965 No. 1824 ATOMIC ENERGY AND RADIOACTIVE SUBSTANCES LICENSING AND REGULATION OF SITES The Nuclear Installations (Dangerous Occurrences) Regulations 1965...

  8. EXHIBITIONS AND INSTALLATIONS ON UNIVERSITY PREMISES

    E-Print Network [OSTI]

    EXHIBITIONS AND INSTALLATIONS ON UNIVERSITY PREMISES Advice for Staff and Students HEALTH & SAFETY of heaters and appliances in rooms....................................... 7 6.4 Toxic risks and ventilation

  9. Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska

    SciTech Connect (OSTI)

    NONE

    1998-05-01T23:59:59.000Z

    The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.

  10. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    SciTech Connect (OSTI)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01T23:59:59.000Z

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  11. Implementing Stakeholders' Access to Expertise: Experimenting on Nuclear Installations' Safety Cases - 12160

    SciTech Connect (OSTI)

    Gilli, Ludivine; Charron, Sylvie [Institut de Radioprotection et de Surete Nucleaire (IRSN), Fontenay-aux-Roses (France)

    2012-07-01T23:59:59.000Z

    In 2009 and 2010, the Institute for Nuclear Safety and Radiation Protection (IRSN) led two pilot actions dealing with nuclear installations' safety cases. One concerned the periodical review of the French 900 MWe nuclear reactors, the other concerned the decommissioning of a workshop located on the site of Areva's La Hague fuel-reprocessing plant site in Northwestern France. The purpose of both these programs was to test ways for IRSN and a small number of stakeholders (Non-Governmental Organizations (NGOs) members, local elected officials, etc.) to engage in technical discussions. The discussions were intended to enable the stakeholders to review future applications and provide valuable input. The test cases confirmed there is a definite challenge in successfully opening a meaningful dialogue to discuss technical issues, in particular the fact that most expertise reports were not public and the conflict that exists between the contrary demands of transparency and confidentiality of information. The test case also confirmed there are ways to further improvement of stakeholders' involvement. (authors)

  12. STATE OF CALIFORNIA MECHANICAL INSTALLATION CERTIFICATE

    E-Print Network [OSTI]

    Alteration Unconditioned If more than one person has responsibility for building construction, each person responsible for construction (responsible person). · I certify that the installed features, materials) MECH-INST PROJECT NAME: DATE: ____________________ Building Permit ____________________ Checked by

  13. STATE OF CALIFORNIA ENVELOPE INSTALLATION CERTIFICATE

    E-Print Network [OSTI]

    Alteration Unconditioned If more than one person has responsibility for building construction, each person responsible for construction (responsible person). · I certify that the installed features, materials) ENV-INST PROJECT NAME: DATE: ____________________ Building Permit ____________________ Checked by

  14. Peoples Gas – Single Family Direct Install (Illinois)

    Broader source: Energy.gov [DOE]

    Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

  15. Install Removable Insulation on Valves and Fittings

    SciTech Connect (OSTI)

    Not Available

    2006-01-01T23:59:59.000Z

    This revised ITP tip sheet on installing removable insulation on valves and fittings provides how-to advice for improving the system using low-cost, proven practices and technologies.

  16. AIR LEAKAGE OF NEWLY INSTALLED RESIDENTIAL WINDOWS

    E-Print Network [OSTI]

    Weidt, John

    2013-01-01T23:59:59.000Z

    Tables 2.0.2a 2.0.2b PAGE Air Leakage Through Sash/FrameOperation Types . . . . . Air Leakage of Installed WindowsComparison of Window Types Air Leakage Performance of

  17. Experiences from the offshore installation of a composite materials firewater system

    SciTech Connect (OSTI)

    Ciaraldi, S.W. [Amoco Norway Oil Co., Stavanger (Norway). Production Dept.

    1993-12-31T23:59:59.000Z

    A prototype 300 m composite dry deluge firewater system was installed in December 1991 at the Valhall Field in the southern North Sea Norwegian offshore sector. This installation followed successful safety verification of the explosion and fire resistant design concept consisting of glass-fiber reinforced epoxy (GRE) piping components protected with a reinforced intumescent epoxy fire insulation. The installation was based primarily on the use of prefabricated GRE piping spools and fire insulation cast onto the piping or applied in the form of cast half shells. Significant experiences gained from the project are described. These experiences involve pre-engineering activities, detailed engineering, onshore fabrication, shipping, offshore hook-up, quality assurance, safety and economics. Although the overall installation was successful and the system is functioning as intended, areas of possible optimization and cost reduction for future composite firewater systems were identified. These findings are also briefly reviewed.

  18. Characterization of the Installed Costs of Prime Movers Using...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Installed Costs of Prime Movers Using Gaseous Opportunity Fuels, September 2007 Characterization of the Installed Costs of Prime Movers Using Gaseous Opportunity Fuels, September...

  19. U.S. Installation, Operation, and Performance Standards for Microturbi...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Installation, Operation, and Performance Standards for Microturbine Generator Sets, August 2000 U.S. Installation, Operation, and Performance Standards for Microturbine Generator...

  20. U.S. CHP Installations Incorporating Thermal Energy Storage ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CHP Installations Incorporating Thermal Energy Storage (TES) andor Turbine Inlet Cooling (TIC), September 2003 U.S. CHP Installations Incorporating Thermal Energy Storage (TES)...

  1. Database (Report) of U.S. CHP Installations Incorporating Thermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Database (Report) of U.S. CHP Installations Incorporating Thermal Energy Storage (TES) andor Turbine Inlet Cooling (TIC), 2004 Database (Report) of U.S. CHP Installations...

  2. Solar Photovoltaic Installation Market Trends | OpenEI Community

    Open Energy Info (EERE)

    Solar Photovoltaic Installation Market Trends Home John55364's picture Submitted by John55364(95) Contributor 14 May, 2015 - 02:24 Global Solar Photovoltaic (PV) Installation...

  3. Purchase and Installation of a Geothermal Power Plant to Generate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purchase and Installation of a Geothermal Power Plant to Generate Electricity Using Geothermal Water Resources Purchase and Installation of a Geothermal Power Plant to Generate...

  4. Utility Scale Renewable Energy Development Near DOD Installations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Scale Renewable Energy Development Near DOD Installations: Making the Case for Land Use Compatitbility Utility Scale Renewable Energy Development Near DOD Installations: Making the...

  5. Floodplain Assessment for Installation of a Renewable Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Installation of a Renewable Energy Anaerobic Digester Facility Floodplain Assessment for Installation of a Renewable Energy Anaerobic Digester Facility Floodplain Assessment...

  6. DOD low energy model installation program

    SciTech Connect (OSTI)

    Fournier, D.F. Jr.

    1994-12-31T23:59:59.000Z

    The Model Low Energy Installation Program is a demonstration of an installation-wide, comprehensive energy conservation program that meets the Department of Defense (DOD) energy management goals of reducing energy usage and costs by at least 20%. It employs the required strategies for meeting these goals, quantifies the environmental compliance benefits resulting from energy conservation and serves as a prototype for DOD wide application. This project will develop both analysis tools and implementation procedures as well as demonstrate the effectiveness of a comprehensive, coordinated energy conservation program based on state-of-the-art technologies.

  7. STATE OF CALIFORNIA INDOOR LIGHTING INSTALLATION CERTIFICATE

    E-Print Network [OSTI]

    # BUILDING TYPE Nonresidential High-Rise Residential Hotel/Motel Guest Room PHASE OF CONSTRUCTION New Construction Addition Alteration Unconditioned If more than one person has responsibility for building responsible for construction (responsible person). · I certify that the installed features, materials

  8. Low-Cost Installation of Concentrating Photovoltaic

    E-Print Network [OSTI]

    .5 megawatt power plant for the Pacific Gas and Electric Company near Tracy, CA ­ the first solar related with system components, and traditional solar designs that limit installation locations. Many offerings. Currently, no solar company provides a complete photovoltaic or concentrating photovoltaic

  9. Page 1 of 8 Installation Name ____________________________________________________________

    E-Print Network [OSTI]

    US Army Corps of Engineers

    to aid in evaluating the overall performance of ground water extraction systems designed and installed of the subsurface performance of a ground water extraction system and the identification of the need for system of alternatives) 2) Typical Treatment Objectives There are two typical objectives for ground water extraction

  10. Page 1 of 6 Installation Name ____________________________________________________________

    E-Print Network [OSTI]

    US Army Corps of Engineers

    information Coordinate this checklist with the Ground Water Extraction System Subsurface Performance Well Design, Installation, and Documentation at HTRW Sites ETL 1110-1-201: Ground Water Extraction ASTM to aid in evaluating the performance and maintenance of extraction, injection, and monitoring wells

  11. TRS-Fiber Optic Classifier Sensor Installation

    E-Print Network [OSTI]

    Prevedouros, Panos D.

    TRS-Fiber Optic Classifier Sensor Installation The sensor that the Traffic Recording System (TRS) uses is the Flexsense Portable Fiberoptic Sensor System by Optical Sensor Systems. This includes two is undetected by the TRS. The user must make sure that the sensors do not get bent or twisted or the fiber optic

  12. IEA HPP Annex 36 Installation/Quality

    E-Print Network [OSTI]

    Oak Ridge National Laboratory

    on installation of air to air heat pump The aim is to use an ergonomic approach, in order to reduce Laboratory European Heat Pump Summit Nuremberg, Germany October 15, 2013 #12;3 Managed by UT), USA 3 10-11 October 2013 EdF, France 4 12 May 2014 Workshop at IEA Heat Pump conference, Montreal

  13. Installing Small Wind Turbines Seminar and Workshop

    E-Print Network [OSTI]

    Seminar and Workshop Installing Small Wind Turbines Seminar and Workshop Location: Murdoch January 2011 Details for Registration and Payment: Mr Daniel Jones, National Small Wind Turbine Test: The National Small Wind Turbine Centre at Murdoch University is holding a Small Wind Turbine short training

  14. Portland Advancing Green Image With Solar Installs

    Broader source: Energy.gov [DOE]

    A quick Internet search reveals that many sources consider Portland, Ore., to be one of the most green-minded cities in the United States. But large upfront costs have been a barrier for citizens looking to install solar power systems in the past. Now, a neighborhood solar initiative is helping communities organize to get solar discounts, meaning the city could become even greener.

  15. Corrective Action

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management Fermi Site Office (FSO)Corporate CultureCorrective Action

  16. Action Items

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613Portsmouth SitePresentations |State WindEconomic Dialogue | DepartmentACTION ITEMS

  17. Preliminary assessment report for Army Aviation Support Facility No. 3, Installation 13307, Hunter Army Airfield, Savannah, Georgia. Installation Restoration Program

    SciTech Connect (OSTI)

    Kolpa, R.; Smith, K.

    1993-07-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Georgia Army National Guard property located on Hunter Army Airfield (HAA) near Savannah, Georgia, known as Army Aviation Support Facility (AASF) No. 3. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, types and quantities of hazardous substances utilized, the nature and amounts of wastes generated or stored at the facility, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the AASF No. 3 property, requirements of the Department of Defense Installation Restoration Program (IRP). The scope of this assessment is limited to the facilities and past activities contained within the area now occupied by AASF No. 3. However, this assessment report is intended to be read in conjunction with a previous IRP assessment of HAA completed in 1992 (USATHAMA 1992) and to provide comprehensive information on AASF No. 3 for incorporation with information contained in that previous assessment for the entirety of HAA.

  18. A new development in microcomputer software for mine ventilation planning involving the installation of fans

    SciTech Connect (OSTI)

    O'Leary, M.S.J.; McPherson, M.J.

    1989-01-01T23:59:59.000Z

    This paper introduces a computer simulation that extends the use of microcomputer systems for mine ventilation planning. The program was developed as part of an ongoing study to produce a simulation model that would determine the optimum duties of a main fan and a booster fan without requiring the trial-and-error runs that are necessary with currently available programs. To use the new program, the user specifies the location of one main fan and one booster fan, and the minimum required airflows in any number of working places. The computer determines the fan duties that maintains the required airflows at the lowest operating costs without causing undesired recirculation. The methodology of the program and an example showing how it can be applied are presented.

  19. Planning a Commercial Fuel Cell Installation

    E-Print Network [OSTI]

    Bowden, J. R.; May, G. W.

    PLANNING A COMMERCIAL FUEL CELL INSTALLATION J. R.Bowden & G. W. May Bechtel National, Inc. San Francisco, California Fuel cell power plants represent a unique opportunity for industrial users to combine on-site electricity generation... and heat recovery with high efficiencies and no significant environmental releases. Thus in some circumstances, the fuel cell may be the best option for industrial cogeneration in locations with environmental restrictions. Because of the modular...

  20. Manuel pour installer une station sismologique OSIRIS

    E-Print Network [OSTI]

    Perrot, Julie

    installation Tout d'abord, enterrer le sismom`etre, s'assurer de l'horizontalit´e du sismo c'est-`a-dire, bulle le c^able sur le sismo, v´erifier de nouveau l'horizontalit´e. GPS Batterie ` Station d "sismo" puis cd osiris puis ./nrtd -set eth0 #12;7- Lancer Firefox (web browser) depuis la barre de menu

  1. A recommended course of action for upgrading Garduda Operations Control Systems

    E-Print Network [OSTI]

    Mathaisel, Dennis F. X.

    1995-01-01T23:59:59.000Z

    Introduction: The purpose of this document is to construct a recommended course of action in the next year for Garuda Operations Control in its efforts to upgrade its information systems technology. The process of installing ...

  2. Energy Saving 'Cool Roofs' Installed at Y-12 | National Nuclear...

    National Nuclear Security Administration (NNSA)

    Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home NNSA Blog Energy Saving 'Cool Roofs' Installed at Y-12 Energy Saving 'Cool Roofs' Installed at Y-12...

  3. Energy Saving "Cool Roofs" Installed at Y-12 | National Nuclear...

    National Nuclear Security Administration (NNSA)

    Home Field Offices Welcome to the NNSA Production Office NPO News Releases Energy Saving "Cool Roofs" Installed at Y-12 Energy Saving "Cool Roofs" Installed at Y-12 The...

  4. Energy Department Launches SunShot Prize Competition to Install...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Launches SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy...

  5. Net Zero Energy Military Installations: A Guide to Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    Net Zero Energy Military Installations: A Guide to Assessment and Planning Net Zero Energy Military Installations: A Guide to Assessment and Planning In 2008, DoD and DOE defined a...

  6. Solar Industry At Work: Streamlining Home Solar Installation...

    Broader source: Energy.gov (indexed) [DOE]

    Solar Industry At Work: Streamlining Home Solar Installation Solar Industry At Work: Streamlining Home Solar Installation June 12, 2012 - 11:59am Addthis Sunrun is a home solar...

  7. Infiniband cables installed | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn Other News link to facebookInfiniband cables installed

  8. NREL Job Task Analysis: Retrofit Installer Technician (Revised)

    SciTech Connect (OSTI)

    Kurnik, C.; Woodley, C.

    2012-04-01T23:59:59.000Z

    A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence.

  9. Preliminary assessment report for Grubbs/Kyle Training Center, Smyrna/Rutherford County Regional Airport, Installation 47340, Smyrna, Tennessee. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.; Stefano, J.

    1993-07-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Tennessee Army National Guard (TNARNG) property near Smyrna, Tennessee. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Grubbs/Kyle Training Center property, the requirement of the Department of Defense Installation Restoration Program.

  10. A GUIDE TO PHOTOVOLTAIC (PV) SYSTEM DESIGN AND INSTALLATION

    E-Print Network [OSTI]

    CALIFORNIA ENERGY COMMISSION A GUIDE TO PHOTOVOLTAIC (PV) SYSTEM DESIGN AND INSTALLATION JUNE 2001 TO PHOTOVOLTAIC (PV) SYSTEM DESIGN AND INSTALLATION Prepared for: California Energy Commission Energy Technology installing photovoltaic (PV) systems under the Emerging Renewables Buydown Program. This is the first

  11. Performance of Installed Cooking Exhaust Devices

    SciTech Connect (OSTI)

    Singer, Brett C.; Delp, William W.; Apte, Michael G.; Price, Philip N.

    2011-11-01T23:59:59.000Z

    The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) – including exhaust fan/microwave combination appliances – were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

  12. Installation of an innovative remedial technology

    SciTech Connect (OSTI)

    Hines, B. [CDM Federal Programs Corp., Kevil, KY (United States)

    1995-12-31T23:59:59.000Z

    The major goal of the Lasagna{trademark} project was to design, construct, install, and operate an in situ remediation system in low-permeability soil. A new technology--the Lasagna process--uses electro-osmosis to move contaminated groundwater through treatment zones. The treatment zones are installed in contaminated soils, thereby forming an integrated in situ remedial process. Electro-osmosis, well known for its effectiveness and extremely low power consumption, uses a direct current to cause Groundwater to travel through low-permeability soil. When a bench-scale version of the technology was 98 percent effective in removing contamination, an actual field test was the next step. The site chosen for this first field effort was the DOE-owned Paducah Gaseous Diffusion Plant located in Paducah, Kentucky. The target contaminant for this project was trichloroethylene (TCE) because it is found at many sites across the country and is present at approximately 60 percent of DOE`s sites.

  13. Case studies of six high priority DOD installations

    SciTech Connect (OSTI)

    NONE

    1994-11-01T23:59:59.000Z

    This is a supplement to the report entitled Environmental Cleanup: Too Many High Priority Sites Impede DOD`s Program. It provides six installation case studies addressing issues including the status of the restoration program, the cost of cleanup to date and projected costs, the cleanup options considered, the option selected, expected completion, and the applicable cleanup standards. The case studies also provide installation specific information on reasons installation was listed on the NPL, the regulatory process, cooperation between the installation and the regulatory agencies, staffing at the installations and the regulatory agencies, and the process for funding the cleanup.

  14. Remedial Action Contacts Directory - 1997

    SciTech Connect (OSTI)

    NONE

    1997-05-01T23:59:59.000Z

    This document, which was prepared for the US Department of Energy (DOE) Office of Environmental Restoration (ER), is a directory of 2628 individuals interested or involved in environmental restoration and/or remedial actions at radioactively contaminated sites. This directory contains a list of mailing addresses and phone numbers of DOE operations, area, site, project, and contractor offices; an index of DOE operations, area, site, project, and contractor office sorted by state; a list of individuals, presented by last name, facsimile number, and e-mail address; an index of affiliations presented alphabetically, with individual contacts appearing below each affiliation name; and an index of foreign contacta sorted by country and affiliation. This document was generated from the Remedial Action Contacts Database, which is maintained by the Remedial Action Program Information Center (RAPIC).

  15. How to connect to the University of Exeter VPN service *****Important Part of the process of using the VPN service involves the automatic

    E-Print Network [OSTI]

    Mumby, Peter J.

    the VPN service involves the automatic download and installation of Juniper Network Connect software administrator rights on your computer to be able to install this software. Once this has been installed you can use it regardless of having administrator rights or not. Additionally, you can check the last page

  16. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    on U.S. Wind Power Installation, Cost, and Performanceand Capital Costs Drive Wind Power Prices. . . . . 14Figure 18. Installed Wind Project Costs over Time Installed

  17. Climate change action plan

    E-Print Network [OSTI]

    Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

  18. Action builds on the road to CAA compliance. Part 2

    SciTech Connect (OSTI)

    Rittenhouse, R.C.

    1992-06-01T23:59:59.000Z

    The most basic of CAA compliance actions taken by many power plants involves fuel switching. This paper provides an overview of coal transportation issues arising from coal switching. One of the findings that the data suggest is that eastern railroad costs are dropping significantly; and, if competition exists, eastern rail rates also should decline, according to Jeremy Platt, EPRI project manager. A utility that switches form a nearby coal source to a low sulfur coal from another state risks inflicting grim consequences on its own service area. For example, reports on potential local job losses range up to 6000 with economic costs of more than $1.5 million in certain areas, including Illinois, western Pennsylvania, West Virginia and Kentucky. There are reports that other states are considering subsidizing scrubber installations at power plants as an investment toward preserving local economies. This is one reason that scrubbers continue to grow in their attraction to meet Phase I of the CAA. Another reason is the expected lower cost of operation for second-generation scrubber technology.

  19. Installation package for a Sunspot Cascade Solar Water Heating System

    SciTech Connect (OSTI)

    None

    1980-09-01T23:59:59.000Z

    Elcam, Incorporated of Santa Barbara, California, has developed two solar water heating systems. The systems have been installed at Tempe, Arizona and San Diego, California. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank and controls. General guidelines are provided which may be utilized in development of detailed instalation plans and specifications. In addition, it provides instruction on operation, maintenance and installation of solar hot water systems.

  20. Non-radioactive disposal facility -- Bioremediation horizontal well installation project

    SciTech Connect (OSTI)

    Kupar, J.; Hasek, M.

    1998-03-01T23:59:59.000Z

    The Sanitary Landfill Corrective Action Plan proposes a two pronged approach to remediation. The first part of the total remediation strategy is the placement of a RCRA style closure cap to provide source control of contaminants into the groundwater. The second part of the proposed remediation package is a phased approach primarily using an in situ bioremediation system for groundwater clean up of the Constituents of Concern (COCs) that exceed their proposed Alternate Concentration Limits (ACL). The phased in approach of groundwater clean up will involve operation of the in situ bioremediation system, followed by evaluation of the Phase 1 system and, if necessary, additional phased remediation strategies. This document presents pertinent information on operations, well locations, anticipated capture zones, monitoring strategies, observation wells and other information which will allow a decision on the acceptability of the remedial strategy as an interim corrective action prior to permit application approval. The proposed interim phase of the remediation program will position two horizontal bioremediation wells such that the respective zones of influence will intersect the migration path for the highest concentrations of each plume.

  1. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    SciTech Connect (OSTI)

    K. Campbell

    2000-04-01T23:59:59.000Z

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  2. NMDOT Application for Permit to Install Utility Facilities Within...

    Open Energy Info (EERE)

    Reference LibraryAdd to library Legal Document- OtherOther: NMDOT Application for Permit to Install Utility Facilities Within Public ROWLegal Published NA Year Signed or Took...

  3. Net Zero Energy Military Installations: A Guide to Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    Net Zero Energy Military Installations: A Guide to Assessment and Planning Samuel Booth, John Barnett, Kari Burman, Josh Hambrick and Robert Westby Technical Report NREL...

  4. Study Guide for Photovoltaic System Installers and Sample Examination...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    some of the basic cognitive material that individuals who install and maintain PV systems should understand. This information is intended primarily as a study guide to help...

  5. Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)

    Broader source: Energy.gov [DOE]

    Jurisdiction's can use this template to develop a standard permit for residential charging stations that allows for quick, safe installation of EVSE.

  6. Electric Vehicle Grid Integration for Sustainable Military Installations (Presentation)

    SciTech Connect (OSTI)

    Simpson, M.

    2011-05-05T23:59:59.000Z

    This presentation discusses electric vehicle grid integration for sustainable military installations. Fort Carson Military Reservation in Colorado Springs is used as a case study.

  7. Reviewing Post-Installation and Annual Reports for Federal ESPC...

    Broader source: Energy.gov (indexed) [DOE]

    uniform and consistent reviews of post-installation and annual reports for federal ESPC projects. These procedures will allow for consistent evaluations of performance...

  8. Learning-by-Doing in Solar Photovoltaic Installations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BOS? Many argue significant LBD in the installation of solar PV. E.g., the California Solar Initiative was motivated by both environmental externalities and LBD spillovers at...

  9. H2-Assisted NOx Traps: Test Cell Results Vehicle Installations

    Broader source: Energy.gov (indexed) [DOE]

    Sam Crane August 28, 2003 H 2 -Assisted NOx Traps: Test Cell Results Vehicle Installations 2 Project Objectives * Determine Advantages of H 2 Assisted NO x Trap Regeneration *...

  10. Plug and Play: Purchase, Install, and Connect Residential Solar...

    Energy Savers [EERE]

    roof mounting system, eliminating the need for racking systems. Once the lightweight solar panels are in place, the system then self-tests for proper installation and...

  11. The Nuclear Installations (Dangerous Occurrences )(Amendment) Regulations 1963 

    E-Print Network [OSTI]

    Wood, Richard; Noble, Michael

    1963-01-01T23:59:59.000Z

    STATUTORY INSTRUMENTS 1963 No. 1358 ATOMIC ENERGY AND RADIOACTIVE SUBSTANCES LICENSING AND REGULATION OF SITES The Nuclear Installations (Dangerous Occurrences) (Amendment) Regulations 1963...

  12. DOE-DOD Emergency Backup Power Fuel Cell Installations

    Fuel Cell Technologies Publication and Product Library (EERE)

    Ths fact sheet describes a collaboration between the departments of Energy and Defense to install and operate 18 fuel cell backup power systems across the United States.

  13. Utility Scale Renewable Energy Development Near DOD Installations...

    Broader source: Energy.gov (indexed) [DOE]

    Aimone, P.E. National Security Global Business Battelle Memorial Institute Utility Scale Renewable Energy Development near DOD Installations Making the Case for Land Use...

  14. CATEGORICAL EXCLUSION TO INSTALL EMSL SUPER-COMPUTER POWER INFRASTRUCT...

    Broader source: Energy.gov (indexed) [DOE]

    be available for future needs. The City of Richland would install the additional transformers as needed. 2. To get the electrical service in usable form to EMSL, Pacific...

  15. EFFICIENCY MAINE DIRECT INSTALLS INCREASE UPGRADE PACE | Department...

    Broader source: Energy.gov (indexed) [DOE]

    EFFICIENCY MAINE DIRECT INSTALLS INCREASE UPGRADE PACE Although Maine has one of the United States' highest homeownership rates, more than one-third of the state's residents...

  16. Global Solar Photovoltaic (PV) Installation Market to be Propelled...

    Open Energy Info (EERE)

    of humid climatic conditions and irregular intensities of solar radiations. The key companies operating in the global solar photovoltaic installation market are Trina Solar...

  17. Rhode Island Stormwater Design and Installation Standards Manual (Rhode Island)

    Broader source: Energy.gov [DOE]

    Rhode Island's stormwater design and installation standards manual has been developed to describe mandatory and suggested stormwater design and performance criteria for applicants to the Department...

  18. Oregon Construction/Installation Permit for Onsite Wastewater...

    Open Energy Info (EERE)

    Oregon ConstructionInstallation Permit for Onsite Wastewater Treatment System Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Construction...

  19. Helping Ensure High-Quality Installation of Solar Power Technologies...

    Energy Savers [EERE]

    both more accessible and affordable. With EERE support, MREA will provide instructor development opportunities and also create sustainable jobs within the solar installation...

  20. Consider Installing High-Pressure Boilers with BackpressureTurbine...

    Broader source: Energy.gov (indexed) [DOE]

    High-Pressure Boilers with Backpressure Turbine-Generators Consider Installing High-Pressure Boilers with Backpressure Turbine-Generators This tip sheet outlines the benefits of...

  1. Upcoming Funding Opportunity for Tower Manufacturing and Installation...

    Energy Savers [EERE]

    intends to support partnerships that lead to innovative designs and processes for wind turbine tower manufacturing and turbine system installation. Supported projects will develop...

  2. applicable aux installations: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ronald E. Jeffries; Ann Anderson; Chet Hendrickson; Chapter Circle Of Life 2000-01-01 97 STATE OF CALIFORNIA INDOOR LIGHTING INSTALLATION CERTIFICATE Energy Storage, Conversion...

  3. Building America Expert Meeting: Achieving the Best Installed...

    Energy Savers [EERE]

    the impact of installation practices on the efficiency and long-term durability of the furnace. exptmtgresidgasfurnaces.pdf More Documents & Publications Building America...

  4. ACTIONS AND PARTIAL ACTIONS OF INDUCTIVE CONSTELLATIONS

    E-Print Network [OSTI]

    Gould, Victoria

    ACTIONS AND PARTIAL ACTIONS OF INDUCTIVE CONSTELLATIONS VICTORIA GOULD AND CHRISTOPHER HOLLINGS structure of a semigroup can be recovered from a partial order it possesses. Date: August 13, 2009. 2000 and FEDER, and also FCT post-doctoral grant SFRH/BPD/34698/2007. 1 #12;2 VICTORIA GOULD AND CHRISTOPHER

  5. Criteria for safety-related operator actions

    SciTech Connect (OSTI)

    Gray, L.H.; Haas, P.M.

    1983-01-01T23:59:59.000Z

    The Safety-Related Operator Actions (SROA) Program was designed to provide information and data for use by NRC in assessing the performance of nuclear power plant (NPP) control room operators in responding to abnormal/emergency events. The primary effort involved collection and assessment of data from simulator training exercises and from historical records of abnormal/emergency events that have occurred in operating plants (field data). These data can be used to develop criteria for acceptability of the use of manual operator action for safety-related functions. Development of criteria for safety-related operator actions are considered.

  6. Corrective Action Investigation Plan for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5, Tonopah Test Range, Nevada, REVISION 0, march 1999

    SciTech Connect (OSTI)

    DOE /NV

    1999-03-26T23:59:59.000Z

    The Corrective Action Investigation Plan for Corrective Action Unit 428, Area 3 Septic Waste Systems 1 and 5, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U. S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 428 consists of Corrective Action Sites 03- 05- 002- SW01 and 03- 05- 002- SW05, respectively known as Area 3 Septic Waste System 1 and Septic Waste System 5. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada , Rev. 1 (DOE/ NV, 1998c). The Leachfield Work Plan was developed to streamline investigations at leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 428. A system of leachfields and associated collection systems was used for wastewater disposal at Area 3 of the Tonopah Test Range until a consolidated sewer system was installed in 1990 to replace the discrete septic waste systems. Operations within various buildings at Area 3 generated sanitary and industrial wastewaters potentially contaminated with contaminants of potential concern and disposed of in septic tanks and leachfields. Corrective Action Unit 428 is composed of two leachfield systems in the northern portion of Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include oil/ diesel range total petroleum hydrocarbons, and Resource Conservation and Recovery Act characteristic volatile organic compounds, semivolatile organic compounds, and metals. A limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from four of the septic tanks and if radiological field screening levels are exceeded. Additional samples will be analyzed for geotechnical and hydrological properties and a bioassessment may be performed. The technical approach for investigating this Corrective Action Unit consists of the following activities: (1) Perform video surveys of the discharge and outfall lines. (2) Collect samples of material in the septic tanks. (3) Conduct exploratory trenching to locate and inspect subsurface components. (4) Collect subsurface soil samples in areas of the collection system including the septic tanks and outfall end of distribution boxes. (5) Collect subsurface soil samples underlying the leachfield distribution pipes via trenching. (6) Collect surface and near- surface samples near potential locations of the Acid Sewer Outfall if Septic Waste System 5 Leachfield cannot be located. (7) Field screen samples for volatile organic compounds, total petroleum hydrocarbons, and radiological activity. (8) Drill boreholes and collect subsurface soil samples if required. (9) Analyze samples for total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and total petroleum hydrocarbons (oil/ diesel range organics). Limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from particular septic tanks and if radiological field screening levels are exceeded. (10) Collect samples from native soils beneath the distribution system and analyze for geotechnical/ hydrologic parameters. (11) Collect and analyze bioassessment samples at the discretion of the Site Supervisor if total petroleum hydrocarbons exceed field- screening levels.

  7. Literature review : reducing soft costs of rooftop solar installations attributed to structural considerations.

    SciTech Connect (OSTI)

    Dwyer, Stephen F.

    2013-03-01T23:59:59.000Z

    Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure a simple and basic determinate beam. That is, instead of considering the composite action of the entire roof structure, the engineer evaluates only a single beam that is deemed conservatively to represent an affected rafter or top chord of a truss. This simplification based on assumptions of a complex problem is where significant conservatism can be introduced. Empirical data will be developed to evaluate this issue. Simple wood beams will be tested to failure. More complex and complete sections of roof structures that include composite action will also be tested to failure. The results can then be compared. An initial step in this process involves a literature review of any work that has been performed on roof structure composite action. The following section summarizes the literature review that was completed.

  8. ANALYSIS OF VARIABILITY IN PRECASTING AND INSTALLATION OF PILE FOUNDATIONS

    E-Print Network [OSTI]

    Tommelein, Iris D.

    1 ANALYSIS OF VARIABILITY IN PRECASTING AND INSTALLATION OF PILE FOUNDATIONS Hasan Kaplan1-stressed precast foundation piles using data collected on a building project that comprised the installation of more than 340 piles. The objective is to assess the presence of product and process variability

  9. Net Zero Energy Military Installations: A Guide to

    E-Print Network [OSTI]

    Net Zero Energy Military Installations: A Guide to Assessment and Planning Samuel Booth, John;Technical Report Net Zero Energy Military NREL/TP-7A2-48876 Installations: A Guide to August 2010 Assessment .......................................................................................................................................1 1 Introduction: Net Zero Energy In DoD Context

  10. Targeting Net Zero Energy for Military Installations (Presentation)

    SciTech Connect (OSTI)

    Burman, K.

    2012-05-01T23:59:59.000Z

    Targeting Net Zero Energy for Military Installations in Kaneohe Bay, Hawaii. A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

  11. Establishing and Sustaining System Integrity via Root of Trust Installation

    E-Print Network [OSTI]

    McDaniel, Patrick Drew

    integrity. The TPM-based integrity measurement approaches are effective for measuring well-known, staticEstablishing and Sustaining System Integrity via Root of Trust Installation Abstract Integrity the management of a system's integrity, we propose a Root of Trust Installation (ROTI) as a foundation for high

  12. IBM Systems Director Active Energy Manager Installation and User's Guide

    E-Print Network [OSTI]

    instructions for using IBM® Systems Director Active Energy Manager software to monitor and manage where powerIBM Systems Director Active Energy Manager Installation and User's Guide Version 4.3 #12;#12;IBM Systems Director Active Energy Manager Installation and User's Guide Version 4.3 #12;ii IBM Systems

  13. Study Guide for Photovoltaic System Installers and Sample Examination Questions

    Broader source: Energy.gov [DOE]

    This study guide presents some of the basic cognitive material that individuals who install and maintain PV systems should understand. This information is intended primarily as a study guide to help better prepare for the NABCEP PV installer examination but does not provide all of the information needed for completing the certification examination.

  14. IBM Systems Director VMControl Installation and User's Guide

    E-Print Network [OSTI]

    IBM Systems Director VMControl Installation and User's Guide Version 2 Release 2 #12;#12;IBM Systems Director VMControl Installation and User's Guide Version 2 Release 2 #12;ii IBM Systems Director read this book . . . . . . . . . 1 Conventions and terminology . . . . . . . . 1 Chapter 2. IBM Systems

  15. Derivative actions in China 

    E-Print Network [OSTI]

    Lin, Shaowei

    2014-07-02T23:59:59.000Z

    The enactment of derivative action was expected to be actively used by shareholders to protect their interests. In fact, it turned out that this reform effort seemed futile as the right to engage in such actions was ...

  16. 2014 Joint Action Workshop

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Joint Action Workshop is an annual event for joint action agencies and their members to meet informally and discuss emerging policy, regulatory, and power supply issues, and other topics...

  17. October 2006 Standards Actions

    Broader source: Energy.gov (indexed) [DOE]

    Project No. SAFT-0109 Continued on next page Standards Actions Page 2 October 2006 2.0 NON-GOVERNMENT STANDARDS ACTIONS 2.1 American National Standards Institute American...

  18. July 2006 Standards Actions

    Broader source: Energy.gov (indexed) [DOE]

    were received in June 2006. Continued on next page Standards Actions Page 2 July 2005 2.0 Non-Government Standards Actions 2.1 American National Standards Institute (ANSI)...

  19. New Jersey SmartStart Buildings- Direct Install Program

    Broader source: Energy.gov [DOE]

    The Direct Install program offers turn-key energy efficiency solutions to qualified industrial and commercial customers that, with some exceptions, have a peak electricity demand of 150 kilowatts ...

  20. Minimum Cost Capacity Installation for Multicommodity Network Flows \\Lambda

    E-Print Network [OSTI]

    Bienstock, Daniel

    Capacity Installation (MCCI) problem. Applications of MCCI are commonly seen in the design for MCCI and then we transform this for­ mulation to a lower dimensional space by projecting out all

  1. Global Installed Capacity of Coal Fired Power Generation to Reach...

    Open Energy Info (EERE)

    Global Installed Capacity of Coal Fired Power Generation to Reach 2,057.6 GW by 2019 Home > Groups > Increase Natural Gas Energy Efficiency John55364's picture Submitted by...

  2. Installing a Subsurface Drip Irrigation System for Row Crops

    E-Print Network [OSTI]

    Enciso, Juan

    2004-09-07T23:59:59.000Z

    This publication describes the components of a subsurface drip irrigation system and the procedure for installing such a system. Each step is outlined and illustrated. Steps include tape injection, trenching, connecting drip lines, back...

  3. Obama Administration Announces Plans to Install New Solar Panels...

    Broader source: Energy.gov (indexed) [DOE]

    WASHINGTON - U.S. Energy Secretary Steven Chu and Council of Environmental Quality (CEQ) Chair Nancy Sutley today announced plans to install solar panels and a solar hot water...

  4. NIPSCO Small Business Direct Install Electric and Natural Gas Program

    Broader source: Energy.gov [DOE]

    NIPSCO's Small Business Direct Install Program is designed to help small businesses minimize energy costs, and provides energy-saving CFL lighting, showerheads and faucet aerators at no added cost.

  5. Banner Job Installation Security Form Office of Information Technology

    E-Print Network [OSTI]

    Karsai, Istvan

    Banner Job Installation Security Form Office of Information Technology 424 Roy S. Nicks Hall, Box: ______________________________ Job Description: ______________________________ Section 3. Security Information Banner Module 70728 Johnson City, Tennessee 37614 (423) 439-4648 · oithelp@etsu.edu Section 1. Requestor Information

  6. Hindawi Publishing Corporation Science and Technology of Nuclear Installations

    E-Print Network [OSTI]

    Demazičre, Christophe

    Hindawi Publishing Corporation Science and Technology of Nuclear Installations Volume 2013, Article Department of Nuclear Chemistry, Chalmers University of Technology, 412 96 Gothenburg, Sweden 2 Department of Nuclear Engineering, Chalmers University of Technology, 412 96 Gothenburg, Sweden Correspondence should

  7. Hole in one: Technicians smoothly install the center stack in...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hole in one: Technicians smoothly install the center stack in the NSTX-U vacuum vessel By John Greenwald November 10, 2014 Tweet Widget Google Plus One Share on Facebook Closeup of...

  8. Video Installation Design: Appropriation and Assemblage As Projection Surface Geometry

    E-Print Network [OSTI]

    Weaver, Timothy A.

    2010-07-14T23:59:59.000Z

    This area of research focuses on the use of video projections in the context of fine art. Emphasis is placed on creating a unique video installation work that incorporates assemblage and appropriation as a means to develop multiple complex...

  9. Defense Energy Support Center: Installation Energy Commodity Business Unit

    Broader source: Energy.gov [DOE]

    Presentation—given at the Spring 2009 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the Defense Energy Support Center's (DESC's) Installation Energy Commodity Business Unit (CBU) including its intent, commitment, pilot project, lessons learned, and impending barriers.

  10. VERA Installation Guide Roscoe A. Bartlett Mark Baird Mark Berrill

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    env just need to source the script, for example: source VERADEVENVBASEgcc-4.8.3loaddevenv.sh (in their .bashprofile file for instance). 8 Details on Installing VERA...

  11. Seeing solar on campus : a visible photovoltaic installation on campus

    E-Print Network [OSTI]

    Guarda, Daniel Jair Alves

    2006-01-01T23:59:59.000Z

    This paper presents a methodology for selecting a site on the MIT campus for a visible solar photovoltaic installation. Visibility, solar exposure, advertising potential, aesthetics, interactivity and direct or important ...

  12. TRINITY HALL HAS INSTALLED CCTV ON THESE PREMISES FOR

    E-Print Network [OSTI]

    Lasenby, Joan

    TRINITY HALL HAS INSTALLED CCTV ON THESE PREMISES FOR YOUR SAFETY AND PROTECTION #12; Trinity Hall Trinity Lane Cambridge CB2 1TJ Tel: 01223 33 25 00 For all enquiries and questions

  13. Offshore Wind Energy Market Installed Capacity is Anticipated...

    Open Energy Info (EERE)

    Offshore Wind Energy Market Installed Capacity is Anticipated to Reach 52,120.9 MW by 2022 Home > Groups > Renewable Energy RFPs Wayne31jan's picture Submitted by Wayne31jan(150)...

  14. North Shore Gas – Single Family Direct Install (Illinois)

    Broader source: Energy.gov [DOE]

    Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

  15. Consider Installing Turbulators on Two- and Three-Pass Firetube...

    Broader source: Energy.gov (indexed) [DOE]

    tip sheet outlines the benefits of turbulators on firetube boilers as part of optimized steam systems. STEAM TIP SHEET 25 Consider Installing Turbulators on Two- and Three-Pass...

  16. Performance Testing of Window Installation and Flashing Details

    E-Print Network [OSTI]

    Weston, T. A.; Herrin, J.

    2002-01-01T23:59:59.000Z

    and proposed installation practices incorporating new flashing materials. This paper focuses specifically on the installation practices relating to windows with mounting fins or flanges. REVIEW OF CURRENT PRACTICES AND ATTITUDES Interviews with builders... into two categories based on the how the flashing and the rough opening is treated. g167g32 2-Dimensional Methods: using flashing to extend protection around the perimeter of the window flanges on to the face of the sheathing, and g167g32 3...

  17. Installation of a high-precision Kirsten Hacker

    E-Print Network [OSTI]

    Installation of a high-precision BPM in BC3 Kirsten Hacker 20-03-07 #12;BPM installed in BC2=T3*c dE/E=D/R16 EBPM T1 T2 T3 ~300mm 3um position resolution -> 1e-5 Energy resoution!!! BPM BPM #12;BPM for the Bunch Compressors beam stripline vacuumstripline vacuumStripline Vacuum Beam beam tapering

  18. Preliminary assessment report for Bee Caves Armory (former Nike BG-80 Fire Control Facility), Installation 48055, Austin, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.

    1993-08-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (ARNG) property in Austin, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing, preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining, site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Bee Caves Armory property, the requirements of the Department of Defense Installation Restoration Program. Of concern is the potential for hazardous waste to be present on the property as a result of the former Nike Missile Base operations or in the form of original construction materials. Environmentally sensitive operations associated with the property from that period include (1) underground fuel storage, (2) hazardous materials storage/use, (3) disposal of hazardous waste and (4) release of hazardous waste water.

  19. SOLARIZE RALEIGH PILOT PROGRAM DRAFT Request for Proposals from Installers of Residential Solar Photovoltaic Systems

    E-Print Network [OSTI]

    solar photovoltaic ("PV") installation companies ("Installer(s)") or teams of installation companiesSOLARIZE RALEIGH PILOT PROGRAM DRAFT Request for Proposals from Installers of Residential Solar Photovoltaic Systems Proposed Posting Date: February 4, 2014 I. OPPORTUNITY SUMMARY: The North Carolina Solar

  20. Protective Actions and Reentry

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21T23:59:59.000Z

    This volume defines appropriate protective actions and reentry of a site following an emergency. Canceled by DOE G 151.1-4.

  1. November 2006 Standards Actions

    Broader source: Energy.gov (indexed) [DOE]

    Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society...

  2. October 2007 Standards Actions

    Broader source: Energy.gov (indexed) [DOE]

    Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society...

  3. May 2008 Standards Actions

    Broader source: Energy.gov (indexed) [DOE]

    Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society...

  4. May 2006 Standards Actions

    Broader source: Energy.gov (indexed) [DOE]

    Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society...

  5. Corrective action decision document for the Roller Coaster Lagoons and North Disposal Trench (Corrective Action Unit Number 404)

    SciTech Connect (OSTI)

    NONE

    1997-03-26T23:59:59.000Z

    The North Disposal Trench, located north of the eastern most lagoon, was installed in 1963 to receive solid waste and construction debris from the Operation Roller Coaster man camp. Subsequent to Operation Roller Coaster, the trench continued to receive construction debris and range cleanup debris (including ordnance) from Sandia National Laboratories and other operators. A small hydrocarbon spill occurred during Voluntary Corrective Action (VCA) activities (VCA Spill Area) at an area associated with the North Disposal Trench Corrective Action Site (CAS). Remediation activities at this site were conducted in 1995. A corrective action investigation was conducted in September of 1996 following the Corrective Action Investigation Plan (CAIP); the detailed results of that investigation are presented in Appendix A. The Roller Coaster Lagoons and North Disposal Trench are located at the Tonopah Test Range (TTR), a part of the Nellis Air Force Range, which is approximately 225 kilometers (140 miles) northwest of Las Vegas, Nevada, by air.

  6. Energy Action Month

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) supports Energy Action Month by offering materials that promote energy- and water-saving practices in Federal facilities. This year's outreach materials call on Federal employees to take action and empower leadership, innovation, and excellence to realize a secure energy future.

  7. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    Type Cumulative Installed Capacity (GW) Utility Interest inin 2006 Cumulative Installed Capacity (GW) 7 projects 450 MWis based on AWEA/GEC installed capacity data for the end of

  8. Tracking the Sun V An Historical Summary of the Installed Price

    E-Print Network [OSTI]

    ..................................................................... 34 The Installed Price of Utility-Scale PV Varies Considerably Across Projects But Has Declined Overall ........... 35 The Installed Price of Utility-Scale Projects Depends on Project Size and System .......................................................... 14 Installed Prices Vary Widely Across Individual Projects

  9. Involvement and Communication Committee.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes | NationalCurriculum IntroductionInvestor andPublic Involvement

  10. Facebook Applications' Installation and Removal: A Temporal Analysis

    E-Print Network [OSTI]

    Kagan, Dima; Elyashar, Aviad; Elovici, Yuval

    2013-01-01T23:59:59.000Z

    Facebook applications are one of the reasons for Facebook attractiveness. Unfortunately, numerous users are not aware of the fact that many malicious Facebook applications exist. To educate users, to raise users' awareness and to improve Facebook users' security and privacy, we developed a Firefox add-on that alerts users to the number of installed applications on their Facebook profiles. In this study, we present the temporal analysis of the Facebook applications' installation and removal dataset collected by our add-on. This dataset consists of information from 2,945 users, collected during a period of over a year. We used linear regression to analyze our dataset and discovered the linear connection between the average percentage change of newly installed Facebook applications and the number of days passed since the user initially installed our add-on. Additionally, we found out that users who used our Firefox add-on become more aware of their security and privacy installing on average fewer new application...

  11. Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations

    SciTech Connect (OSTI)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-08-30T23:59:59.000Z

    Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNL’s established renewable resource assessment methodology.

  12. Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

    E-Print Network [OSTI]

    Barbose, Galen

    2011-01-01T23:59:59.000Z

    price and cumulative installed capacity data: Yamamoto, M.price and cumulative installed capacity data: Wissing, L.the number of systems and installed capacity by PV incentive

  13. Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

    E-Print Network [OSTI]

    Barbose, Galen L

    2010-01-01T23:59:59.000Z

    price and cumulative installed capacity data: Yamamoto, M.price and cumulative installed capacity data: Wissing, L.the number of systems and installed capacity by PV incentive

  14. Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007

    E-Print Network [OSTI]

    Wiser, Ryan

    2009-01-01T23:59:59.000Z

    Boston, Massachusetts. Installed capacity totals refer tothe number of systems and installed capacity by PV incentiveFigure 2. In terms of installed capacity, these two states

  15. Finite Temperature Effective Actions

    E-Print Network [OSTI]

    Ashok Das; J. Frenkel

    2009-08-27T23:59:59.000Z

    We present, from first principles, a direct method for evaluating the exact fermion propagator in the presence of a general background field at finite temperature, which can be used to determine the finite temperature effective action for the system. As applications, we determine the complete one loop finite temperature effective actions for 0+1 dimensional QED as well as the Schwinger model. These effective actions, which are derived in the real time (closed time path) formalism, generate systematically all the Feynman amplitudes calculated in thermal perturbation theory and also show that the retarded (advanced) amplitudes vanish in these theories.

  16. Climate Action Plan (Michigan)

    Broader source: Energy.gov [DOE]

    On November 14, 2007, Governor Jennifer M. Granholm issued Executive Order No. 2007-42 establishing the Michigan Climate Action Council (MCAC). The Council is comprised of members representing...

  17. August 2007 Standards Actions

    Broader source: Energy.gov (indexed) [DOE]

    August 2007 1.5 DOE Technical Standards Published No entries were received in August 2007 2.0 Non-Government Standards Actions 2.1 American National Standards Institute (ANSI)...

  18. July 2007 Standards Actions

    Broader source: Energy.gov (indexed) [DOE]

    in June 2007 1.5 DOE Technical Standards Published No entries were received in June 2007 2.0 Non-Government Standards Actions 2.1 American National Standards Institute (ANSI)...

  19. April 2007 Standards Actions

    Broader source: Energy.gov (indexed) [DOE]

    and Injury Surveillance Program Guidelines, 03222007; DOE-STD-1190-2007, OCSH-0005 2.0 Non-Government Standards Actions 2.1 American National Standards Institute (ANSI)...

  20. Corrective Action Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-03-02T23:59:59.000Z

    This Guide was developed to assist the Department of Energy (DOE) organizations and contractors in the development, implementation, and followup of corrective action programs utilizing the feedback and improvement core safety function within DOE's Integrated Safety Management System. This Guide outlines some of the basic principles, concepts, and lessons learned that DOE managers and contractors might consider when implementing corrective action programs based on their specific needs. Canceled by DOE G 414.1-2B. Does not cancel other directives.

  1. EXHIBITION INSTALLATION AND DISMANTLING Item Handling and Housing

    E-Print Network [OSTI]

    Mathis, Wayne N.

    EXHIBITION INSTALLATION AND DISMANTLING Item Handling and Housing A. For general handling's and Don'ts. B. For examples of housing options and alternatives for paper artifacts, see Housing and Environment Options for Display, Housing and Environment Options for Storage, or consult a conservator. 1. All

  2. Sun N1 Grid Engine 6.1 Installation Guide

    E-Print Network [OSTI]

    Sun N1 Grid Engine 6.1 Installation Guide Sun Microsystems, Inc. 4150 Network Circle Santa Clara, CA 95054 U.S.A. Part No: 820­0697 May 2007 #12;Copyright 2007 Sun Microsystems, Inc. 4150 Network Circle, Santa Clara, CA 95054 U.S.A. All rights reserved. Sun Microsystems, Inc. has intellectual

  3. Ecological Site Applications on U.S. Military Installations

    E-Print Network [OSTI]

    live ammunition, etc #12;Military Training Impacts #12;Integrated Training Area Management (ITAM a defined land condition baseline for natural and cultural resources that will be maintained through ITAM and is relevant to the installation environmental setting and mission activity. #12;Ecological Sites and ITAM

  4. Decision Support Tool for Desert Tortoises Near Solar Installations

    E-Print Network [OSTI]

    Decision Support Tool for Desert Tortoises Near Solar Installations ENVIRONMENTAL AREA RESEARCH of renewable energy is of vital importance. Through its focus on reducing the environmental impacts of solar PIER Environmental Research www.energy.ca.gov/research/ environmental/index.html April 2011 The Issue

  5. Installing or Upgrading to the SQL Server 2008

    E-Print Network [OSTI]

    Bernstein, Phil

    CHAPTER 1 Installing or Upgrading to the SQL Server 2008 Database Engine SQL Server 2008 Database Engine Services, formerly referred to as "The Database Engine," is the nucleus of SQL Server 2008. Its that command the use of a feature like SQL Server's Database Engine that can process, store, and secure data

  6. Porous Pavements in Cold Climates Part 1: Design, Installation, and

    E-Print Network [OSTI]

    Porous Pavements in Cold Climates Part 1: Design, Installation, and Maintenance A Green Pavements and Infiltration Beds Joshua F. Briggs, Geosyntec, Kristopher Houle, Horsley Witten Group Jeff Manager, CH2M HILL ASCE Committee Report on Recommended Design Guidelines for Permeable Pavements

  7. TI 151A Installation of Controller Module. TABLE OF CONTENTS

    E-Print Network [OSTI]

    Fischer, Emily V.

    containing relays to switch the pumps. · Tool kit with 8" and 10" adjustable crescent wrench, channel lock will be at the sampler installation location, protected by wire nuts. -For an indoors site: a. In the form of a 20 Amp, fuses, relays, and transformers to control sampling initiation. The controller module was designed

  8. Vet’s company installing solar across Massachusetts

    Broader source: Energy.gov [DOE]

    Dan Leary, a U.S. Army veteran, is president of Nexamp Inc., a clean energy company that specializes in solar installation. Dan founded the company in 2006 and has witnessed its impressive growth from six employees to 65 and counting as of July 2010.

  9. T-729: Mozilla Code Installation Through Holding Down Enter

    Broader source: Energy.gov [DOE]

    Attackers can exploit this issue by enticing an unsuspecting victim into viewing and interacting with a malicious Web page. An attacker may be able to exploit this issue to bypass a confirmation dialog and install an arbitrary add-on. This may aid in further attacks.

  10. Sustainability Research & Development Consortium for DoD Installations

    E-Print Network [OSTI]

    Sustainability Research & Development Consortium for DoD Installations Warner College of Natural the growing need for sustainability planning, imple- mentation, and facilitation on United States military bases. CEMML is already a proven global provider of re- search and sustainable management of natural

  11. WARNING: Improper installation, adjustment, alteration, service or maintenance can

    E-Print Network [OSTI]

    Kostic, Milivoje M.

    INSTALLATION AND OPERATING INSTRUCTIONS FOR AUTOMATIC INSTANTANEOUS TYPE WATER HEATERS FOR USE WITH NATURAL(02.01)AL #12;2 This well engineered, gas water heater has all the fea- tures a water heater should have on the water heater, giving you control over your hot water energy use. Each time you turn off your hot water

  12. Systems study of drilling for installation of geothermal heat pumps

    SciTech Connect (OSTI)

    Finger, J.T.; Sullivan, W.N.; Jacobson, R.D.; Pierce, K.G.

    1997-09-01T23:59:59.000Z

    Geothermal, or ground-source, heat pumps (GHP) are much more efficient than air-source units such as conventional air conditioners. A major obstacle to their use is the relatively high initial cost of installing the heat-exchange loops into the ground. In an effort to identify drivers which influence installation cost, a number of site visits were made during 1996 to assess the state-of-the-art in drilling for GHP loop installation. As an aid to quantifying the effect of various drilling-process improvements, we constructed a spread-sheet based on estimated time and material costs for all the activities required in a typical loop-field installation. By substituting different (improved) values into specific activity costs, the effect on total project costs can be easily seen. This report contains brief descriptions of the site visits, key points learned during the visits, copies of the spread-sheet, recommendations for further work, and sample results from sensitivity analysis using the spread-sheet.

  13. THE IMPACT OF CITY-LEVEL PERMITTING PROCESSES ON RESIDENTIAL PV INSTALLATION PRICES AND DEVELOPMENT TIMES

    E-Print Network [OSTI]

    Dong, Changgui

    2014-01-01T23:59:59.000Z

    The installed price of photovoltaic (PV) systems hasprice and development time of residential photovoltaic (PV)

  14. EA-1655: Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development

    Broader source: Energy.gov [DOE]

    Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development

  15. Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications

    SciTech Connect (OSTI)

    Robinson, Sharon M [ORNL; Jubin, Robert Thomas [ORNL; Patton, Bradley D [ORNL; Sullivan, Nicholas M [ORNL; Bugbee, Kathy P [ORNL

    2009-09-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) Office of Environmental Management (EM) cleanup mission at Oak Ridge National Laboratory (ORNL) includes dispositioning facilities, contaminated legacy materials/waste, and contamination sources and remediation of soil under facilities, groundwater, and surface water to support final Records of Decision (RODs). The Integrated Facilities Disposition Project (IFDP) is a roughly $15B project for completion of the EM mission at Oak Ridge, with a project duration of up to 35 years. The IFDP Mission Need Statement - Critical Decision-0 (CD-0) - was approved by DOE in July 2007, and the IFDP Alternative Selection and Cost Range - Critical Decision-1 (CD-1) - was approved in November 2008. The IFDP scope includes reconfiguration of waste collection and treatment systems as needed to complete the IFDP remediation and decontamination and decommissioning (D&D) missions in a safe and cost-effective manner while maintaining compliance with all governing regulations and bodies and preserving the support of continuing operations at ORNL. A step in the CD-1 approval process included an external technical review (ETR) of technical approaches proposed in the CD-1 document related to the facility reconfiguration for the ORNL radioactive waste and liquid low-level waste management systems. The ETR team recommended that the IFDP team consider the use of trenchless technologies for installing pipelines underground in and around contaminated sites as part of the alternatives evaluations required in support of the CD-2 process. The team specifically recommended evaluating trenchless technologies for installing new pipes in existing underground pipelines as an alternative to conventional open trench installation methods. Potential benefits could include reduction in project costs, less costly underground piping, fewer disruptions of ongoing and surface activities, and lower risk for workers. While trenchless technologies have been used extensively in the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES&H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

  16. Gille-MAE 124/ESYS 103, Spring 2010 1 Paper 1: Evaluating Environmental Actions

    E-Print Network [OSTI]

    Gille, Sarah T.

    Gille-MAE 124/ESYS 103, Spring 2010 1 Paper 1: Evaluating Environmental Actions The media offers environmental strategies to adopt? Suppose that you have a $5 million budget to invest in an environmental efficiency windows. · Install a rooftop solar photovoltaic electrical system. · Invest the funding

  17. Evaluation of the utilities energy monitoring and control system installed at the US Army, Europe, Pirmasens and 97th Base Support Battalion, Germany

    SciTech Connect (OSTI)

    Broders, M.A.; McConnell, B.W.

    1992-01-01T23:59:59.000Z

    Authorized under an interagency agreements between the US Department of Energy and the US Army, evaluation of the utilities energy monitoring and control system (UEMCSs) operating at selected US Army installations in Heidelberg, Goeppingen, Pirmasens, and Baumholder, Germany, is nearing completion. This report specifically presents the results of the evaluation of the UEMCS installed at USAREUR, 21st Theater Army Area Command (TAACOM), Pirmasens and 97th Base Support Battalion, which is operated by the Directorate of Engineering and Housing (DEH) Utilities Division. The Oak Ridge National Laboratory (ORNL) was selected by Headquarters, USAREUR, Facilities Engineering Division, Utilities and Energy Branch in Heidelberg to evaluated the overall effectiveness and energy efficiency of UEMCSs at four US Army installations in Germany. The third of these systems to be evaluated, which is the scope of this report, is the UEMCS installed at Pirmasens. This evaluation relies upon existing data and information and does not involve introducing metering and instrumentation for the purpose of measuring installation energy use. The primary purpose of this evaluation is to take an in-depth look at the overall performance and effectiveness of the UEMCS installed at Pirmasens to see if it is achieving its operational objectives by resulting in energy and cost savings.

  18. Mitigation Action Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  19. Impact of Installation Faults on Heat Pump Performance

    SciTech Connect (OSTI)

    Hourahan, Mr. Glenn [Air Conditioning Contractors of America, Arlington, VA; Baxter, Van D [ORNL

    2015-01-01T23:59:59.000Z

    Numerous studies and surveys indicate that typically-installed HVAC equipment operate inefficiently and waste considerable energy due to varied installation errors (faults) such as improper refrigerant charge, incorrect airflow, oversized equipment, and leaky ducts. This article summarizes the results of a large United States (U.S.) experimental/analytical study (U.S. contribution to IEA HPP Annex 36) of the impact that different faults have on the performance of an air-source heat pump (ASHP) in a typical U.S. single-family house. It combines building effects, equipment effects, and climate effects in an evaluation of the faults impact on seasonal energy consumption through simulations of the house/ASHP pump system.

  20. Idaho National Engineering Laboratory installation roadmap document. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-05-30T23:59:59.000Z

    The roadmapping process was initiated by the US Department of Energy`s office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included.

  1. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    SciTech Connect (OSTI)

    Tim Echelard

    2006-03-01T23:59:59.000Z

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department of Energy (DOE) determined that the degree of uncertainty in transport predictions for PSA remained unacceptably large. As a result, a second CAIP was developed by DOE and approved by the Nevada Division of Environmental Protection (NDEP) in December 1998 (DOE/NV, 1998a). This plan prescribed a rigorous analysis of uncertainty in the Shoal model and quantification of methods of reducing uncertainty through data collection. This analysis is termed a Data Decision Analysis (Pohll et al., 1999a) and formed the basis for a second major characterization effort at PSA (Pohll et al., 1999b). The details for this second field effort are presented in an Addendum to the CAIP, which was approved by NDEP in April 1999 (DOE/NV, 1999a). Four additional characterization wells were drilled at PSA during summer and fall of 1999; details of the drilling and well installation are in IT Corporation (2000), with testing reported in Mihevc et al. (2000). A key component of the second field program was a tracer test between two of the new wells (Carroll et al., 2000; Reimus et al., 2003). Based on the potential exposure pathways, two corrective action objectives were identified for CAU 447: Prevent or mitigate exposure to groundwater contaminants of concern at concentrations exceeding regulatory maximum contaminant levels or risk-based levels; and Reduce the risk to human health and the environment to the extent practicable. Based on the review of existing data, the results of the modeling, future use, and current operations at PSA, the following alternatives have been developed for consideration at CAU 447: Alternative 1--No Further Action; Alternative 2--Proof-of-Concept and Monitoring with Institutional Controls; and Alternative 3--Contaminant Control. The corrective action alternatives were evaluated based on the approach outlined in the ''Focused Evaluation of Selected Remedial Alternatives for the Underground Test Area'' (DOE/NV, 1998b). Each alternative was assessed against nine evaluation criteria. These criteria include overall protection of human health and the environment;

  2. Technical oversight for installation of TNX piezometers, Final Report

    SciTech Connect (OSTI)

    Pidcoe, W.W. Jr. [Westinghouse Savannah River Company, Aiken, SC (United States)

    1997-06-05T23:59:59.000Z

    Science Applications International Corporation was tasked under subcontract C002025P to provide technical oversight for the drilling of one pilot borehole, and the drilling and installation of five piezometers in the TNX Area Swamp. The work was performed in accordance with the Statement of Work in Task Order Proposal No. ER39-129 dated August 6, 1996. This report describes the activities associated with the performance of the task.

  3. New BPM installed in BC2 Jan Hauschildt

    E-Print Network [OSTI]

    New BPM installed in BC2 Compact! Thanks to: Jan Hauschildt Dirk Noelle Silke Vilcins Holger 30 40 time (ns) Volts chicane BPM scope traces for 12-16 MV/m gradient Scope in tunnel ~ 150 um resolution => 5*10-4 resolution #12;-20 -15 -10 -5 0 0.9 1 1.1 1.2 1.3 1.4 1.5 BPM slope phase (deg

  4. Open PV Project: Unlocking PV Installation Data (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2012-04-01T23:59:59.000Z

    This brochure summarizes the Open PV Project, a collaborative effort of government, industry, and the public to compile a comprehensive database of PV installations in the United States. The brochure outlines the purpose and history of the project as well as the main capabilities and benefits of the online Open PV tool. The brochure also introduces how features of the tool are used, and it describes the sources and characteristics of Open PV's data and data collection processes.

  5. Solar space and water heating system installed at Charlottesville, Virginia

    SciTech Connect (OSTI)

    Greer, Charles R.

    1980-09-01T23:59:59.000Z

    The solar energy system located at David C. Wilson Neuropsychiatric Hospital, Charlottesville, Virginia, consists of 88 single glazed, Sunworks Solector copper base plate collector modules; hot water coils in the hot air ducts; a domestic hot water (DHW) preheat tank; a 3,000 gallon concrete urethane-insulated storage tank and other miscellaneous components. This report includes extracts from the site files, specifications, drawings, installation, operation and maintenance instructions.

  6. CSP'960H/CSP-960S Installation Guide

    E-Print Network [OSTI]

    Kleinfeld, David

    CSP'960H/CSP-960S Installation Guide 4-634-979-01 TM Read First! 1^00 - 3lG - 755; #12;CSP-960H/CSP CSP-960H only) J Sony CDU926S CD-R Drive Unit User's Guide Use this manual as a guide to help you. If all the items are not found, please contact your Sony dealer before proceeding. G CSP-960H/960S CD

  7. Design and installation manual for thermal energy storage

    SciTech Connect (OSTI)

    Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M

    1980-01-01T23:59:59.000Z

    The purpose of this manual is to provide information on the design and installation of thermal energy storage in active solar systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating and cooling systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-Chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to latent heat storage include properties of phase-change materials, sizing the storage unit, insulating the storage unit, available systems, and cost. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating systems, and stand alone domestics hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, economic insulation thickness, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

  8. Final report : 2004 monitoring well installation and sampling at Centralia,Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.

    2006-02-08T23:59:59.000Z

    This document reports on monitoring well installation and sampling in 2004 at the location of a grain storage facility formerly operated in Centralia, Kansas, by the Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA). Argonne National Laboratory is conducting environmental investigations of carbon tetrachloride contamination in groundwater at this site for the CCC/USDA. With the approval of the Kansas Department of Health and Environment (KDHE), Argonne installed six monitoring wells at the former facility in July 2004 to supplement existing monitoring points (piezometers) installed during Argonne's Phase I investigation in 2002. Together, the monitoring wells and piezometers constitute a monitoring network designed to (1) confirm the lateral distribution of carbon tetrachloride in the groundwater, (2) track any migration of contaminants that might take place, and (3) monitor aquifer geochemical characteristics. To verify that the six new monitoring wells had been developed adequately, they were sampled after their installation in July 2004 for analysis for volatile organic compounds (VOCs). The monitoring wells were sampled again in August 2004, after a stabilization period of four weeks. Five of the Phase I piezometers were also sampled in August 2004. Results of analysis of the August 2004 groundwater samples for VOCs confirmed the Phase II investigation's findings (based on sampling in March and April 2003) that carbon tetrachloride contamination in groundwater is generally confined to the boundary of the former CCC/USDA facility. Little migration of contamination from the former facility has been evident. Nevertheless, the network of monitoring wells now in place may not be adequate to delineate the extent of the plume. Future expansion of the network will proceed per agreement between the CCC/USDA and the KDHE. The groundwater samples collected in August 2004 were also analyzed for attenuation parameters that are helpful in determining whether the subsurface environment is suitable for natural in situ biodegradation of carbon tetrachloride. A preliminary screening of the results with a protocol of the U.S. Environmental Protection Agency showed limited evidence for active reductive dechlorination, one of the anaerobic processes by which carbon tetrachloride is biodegraded. These results indicate that additional monitoring of the groundwater contamination at the former CCC/USDA facility at Centralia is merited. On the basis of the findings and conclusions of the Phase I and Phase II investigations, as well as the results of the 2004 well sampling, a program of twice yearly groundwater monitoring in the expanded network is recommended to collect the data necessary to (1) monitor changes in plume dynamics and (2) evaluate the suitability of monitored natural attenuation as a remedial option for the Centralia site. This monitoring program should be conducted for a minimum of two years. After completion of the two-year monitoring program, remedial action objectives and potential corrective action alternatives are to be developed to address the groundwater contamination at Centralia.

  9. CLOSEOUT REPORT REMEDIAL ACTION

    E-Print Network [OSTI]

    FINAL CLOSEOUT REPORT REMEDIAL ACTION AREA OF CONCERN 6 BUILDING 650 RECLAMATION FACILITY SUMP York 11973 REGISTERED TO ISO 14001 #12;AOC 6 BUILDING 650 RECLAMATION FACILITY SUMP AND SUMP OUTFALL .................................................................................9 2.6.1 Final Radiological Status Survey Design

  10. Conjugate flow action functionals

    SciTech Connect (OSTI)

    Venturi, Daniele, E-mail: daniele-venturi@brown.edu [Division of Applied Mathematics, Brown University, Rhode Island 02912 (United States)] [Division of Applied Mathematics, Brown University, Rhode Island 02912 (United States)

    2013-11-15T23:59:59.000Z

    We present a new general framework to construct an action functional for a non-potential field theory. The key idea relies on representing the governing equations relative to a diffeomorphic flow of curvilinear coordinates which is assumed to be functionally dependent on the solution field. Such flow, which will be called the conjugate flow, evolves in space and time similarly to a physical fluid flow of classical mechanics and it can be selected in order to symmetrize the Gâteaux derivative of the field equations with respect to suitable local bilinear forms. This is equivalent to requiring that the governing equations of the field theory can be derived from a principle of stationary action on a Lie group manifold. By using a general operator framework, we obtain the determining equations of such manifold and the corresponding conjugate flow action functional. In particular, we study scalar and vector field theories governed by second-order nonlinear partial differential equations. The identification of transformation groups leaving the conjugate flow action functional invariant could lead to the discovery of new conservation laws in fluid dynamics and other disciplines.

  11. Action Plan Materials Science

    E-Print Network [OSTI]

    Fitze, Patrick

    sense, including all strata) has available to it a wide range of con- venient products which improve, improving companies' pros- pects and generating wealth without harming the environment. And allAction Plan 2010-2013 Materials Science Area EXECUTIVE SUMMARY #12;N.B.: If you require any further

  12. Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0

    SciTech Connect (OSTI)

    Susan Evans

    2004-11-01T23:59:59.000Z

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release and migration behavior (Pohlmann et al., 2000). The second modeling phase (known as a Data Decision Analysis [DDA]) occurred after the Nevada Division of Environmental Protection reviewed the first model and was designed to respond to concerns regarding model uncertainty (Pohll and Mihevc, 2000). The third modeling phase updated the original flow and transport model to incorporate the uncertainty identified in the DDA, and focused the model domain on the region of interest to the transport predictions. This third phase culminated in the calculation of contaminant boundaries for the site (Pohll et al., 2003).

  13. Corrective Action Investigation Plan for Corrective Action Unit...

    Office of Scientific and Technical Information (OSTI)

    Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada Re-direct Destination: Corrective Action Unit (CAU) 541 is...

  14. SAVEnergy Action Plans

    SciTech Connect (OSTI)

    Mayo, K.; Westby, R. [National Renewable Energy Lab., Golden, CO (United States)] [National Renewable Energy Lab., Golden, CO (United States); deMonsabert, S. [George Mason Univ., Fairfax, VA (United States)] [George Mason Univ., Fairfax, VA (United States); Ginsberg, M. [USDOE, Washington, DC (United States)] [USDOE, Washington, DC (United States)

    1994-04-01T23:59:59.000Z

    The Department of Energy`s Federal Energy Management Program (FEMP) is charged with carrying out key sections of EPACT and Executive Order 12903, to make the Federal government operate more efficiently. A congressionally mandated energy and water conservation audit program is one component of this growing DOE program. This paper traces the SAVEnergy Action Plan program throughout its development from (1) identifying projects and Agency champions, (2) establishing a protocol and fitting auditors into the program, (3) developing a data base to track the audits and measure their success, and (4) evaluating the process, learning from mistakes, and charting and transferring successes. A major tenet of the SAVEnergy program is to proactively prescreen all audit activities to ensure that -- where audits are done and Action Plans completed -- projects will be done.

  15. DEVELOPMENT, INSTALLATION AND OPERATION OF THE MPC&A OPERATIONS MONITORING (MOM) SYSTEM AT THE JOINT INSTITUTE FOR NUCLEAR RESEARCH (JINR) DUBNA, RUSSIA

    SciTech Connect (OSTI)

    Kartashov,V.V.; Pratt,W.; Romanov, Y.A.; Samoilov, V.N.; Shestakov, B.A.; Duncan, C.; Brownell, L.; Carbonaro, J.; White, R.M.; Coffing, J.A.

    2009-07-12T23:59:59.000Z

    The Material Protection, Control and Accounting (MPC&A) Operations Monitoring (MOM) systems handling at the International Intergovernmental Organization - Joint Institute for Nuclear Research (JINR) is described in this paper. Category I nuclear material (plutonium and uranium) is used in JINR research reactors, facilities and for scientific and research activities. A monitoring system (MOM) was installed at JINR in April 2003. The system design was based on a vulnerability analysis, which took into account the specifics of the Institute. The design and installation of the MOM system was a collaborative effort between JINR, Brookhaven National Laboratory (BNL) and the U.S. Department of Energy (DOE). Financial support was provided by DOE through BNL. The installed MOM system provides facility management with additional assurance that operations involving nuclear material (NM) are correctly followed by the facility personnel. The MOM system also provides additional confidence that the MPC&A systems continue to perform effectively.

  16. HighCharts Non-commercial installation and activation help needed...

    Open Energy Info (EERE)

    Hi, I have installed Databus. After a fewdays the dashboard went blank with the message to get a license for Highcharts. How do I install the latest Non-commercial version...

  17. Installing OMERO.searcher Local Client version 1.3 in MacOSX

    E-Print Network [OSTI]

    Murphy, Robert F.

    the license 5. Install Enthought. It is Python distribution with a GUI, integrated code editor and IPython #12;console that comes with numpy+scipy+matplotlib+PIL+ipython. Before installing the software we need to make

  18. So You Want to Go Solar? 3 Things to Consider When Installing...

    Office of Environmental Management (EM)

    So You Want to Go Solar? 3 Things to Consider When Installing Solar Power at Home So You Want to Go Solar? 3 Things to Consider When Installing Solar Power at Home October 3, 2014...

  19. Volume XVI, No. 1 A publication of the U.S. Army Installation Management Agency

    E-Print Network [OSTI]

    US Army Corps of Engineers

    . January/February 2004 Vol. XVI, No. 1 Printed on recycled paper. U.S. Army Installation Management Agency of installation services through Common Levels of Support by Karan Foutch 12 Don't be caught by the tire TRAP

  20. First U.S. Grid-Connected Offshore Wind Turbine Installed Off...

    Office of Environmental Management (EM)

    First U.S. Grid-Connected Offshore Wind Turbine Installed Off the Coast of Maine First U.S. Grid-Connected Offshore Wind Turbine Installed Off the Coast of Maine October 1, 2013 -...

  1. Oil/gas separator for installation at burning wells

    DOE Patents [OSTI]

    Alonso, Carol T. (Orinda, CA); Bender, Donald A. (Dublin, CA); Bowman, Barry R. (Livermore, CA); Burnham, Alan K. (Livermore, CA); Chesnut, Dwayne A. (Pleasanton, CA); Comfort, III, William J. (Livermore, CA); Guymon, Lloyd G. (Livermore, CA); Henning, Carl D. (Livermore, CA); Pedersen, Knud B. (Livermore, CA); Sefcik, Joseph A. (Tracy, CA); Smith, Joseph A. (Livermore, CA); Strauch, Mark S. (Livermore, CA)

    1993-01-01T23:59:59.000Z

    An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

  2. Oil/gas separator for installation at burning wells

    DOE Patents [OSTI]

    Alonso, C.T.; Bender, D.A.; Bowman, B.R.; Burnham, A.K.; Chesnut, D.A.; Comfort, W.J. III; Guymon, L.G.; Henning, C.D.; Pedersen, K.B.; Sefcik, J.A.; Smith, J.A.; Strauch, M.S.

    1993-03-09T23:59:59.000Z

    An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

  3. Spurring Solar Installations in Hawaii | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssues DOE's NuclearSpurring Solar Installations in Hawaii Spurring

  4. Factors Affecting PMU Installation Costs (October 2014) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport in RepresentativeDepartmentEnergy Factors Affecting PMU Installation Costs

  5. Workplace Charging Challenge: Install and Manage PEV Charging at Work |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015ofDepartment of EnergyThePatricia HoffmanDepartment of Energy Install

  6. Installed Geothermal Capacity/Data | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty,Jump7OpenInnovative SolutionsInsource Energy JumpInstalled

  7. NM Installation Requirements for UST Systems | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: Energy Resources JumpNEF Advisors LLC JumpNF EnergyInstallation

  8. Property:Project Installed Capacity (MW) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I GeothermalPotentialBiopowerSolidGenerationMethod Jump to: navigation, search Property NameInstalled Capacity

  9. NREL Job Task Analysis: Retrofit Installer Technician | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of Contamination in Many Devils Wash,Energy NREL Job Task Analysis: Retrofit Installer

  10. Installing and Operating an Efficient Swimming Pool Pump | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(FactDepartment of Energy InvestingS10IS007 InspectionRemovableInstalling

  11. Climate Action Plan (Manitoba, Canada)

    Broader source: Energy.gov [DOE]

    Manitoba's Climate Action Plan centers around energy efficiency, although it includes mandates and initiatives for renewable sources of energy.

  12. (c) 2001, Laszlo Gulyas, Harvard University Installing a development environment for Java

    E-Print Network [OSTI]

    Tesfatsion, Leigh

    (for installation) ·High resolution graphic adapter and monitor (1024x768 or higher, 256 colors) ·Mouse through the following two main steps: 1.Installing the JavaTM 2 SDK, Standard Edition, v 1.4.0 (or later these steps, one after another. Installing the JavaTM 2 SDK, Standard Edition, v 1.4.1 This section describes

  13. Environmental impacts of large-scale grid-connected ground-mounted PV installations

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Environmental impacts of large-scale grid-connected ground-mounted PV installations Antoine Beylota-scale ground-mounted PV installations by considering a life-cycle approach. The methodology is based. Mobile PV installations with dual-axis trackers show the largest impact potential on ecosystem quality

  14. Tracking Progress Last updated 10/7/2013 Installed Capacity 1

    E-Print Network [OSTI]

    Tracking Progress Last updated 10/7/2013 Installed Capacity 1 Installed Capacity The capacities 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Capacity (MW) Wind Solar Small Hydro Large Hydro Reporting #12;Tracking Progress Last updated 10/7/2013 Installed Capacity 2 Table 1 provides the data

  15. STATE OF CALIFORNIA HSPP/PSPP INSTALLATION; COOLING COIL AIRFLOW & FAN WATT DRAW TEST

    E-Print Network [OSTI]

    STATE OF CALIFORNIA HSPP/PSPP INSTALLATION; COOLING COIL AIRFLOW & FAN WATT DRAW TEST CEC- CF-4R TESTING CF-4R-MECH-22 HSPP/PSPP Installation; Cooling Coil Airflow & Fan Watt Draw Test (Page 1 of 3) Site of a Static Pressure Probe (HSPP), and Permanently installed Static Pressure Probe (PSPP) in the supply plenum

  16. STATE OF CALIFORNIA HSPP/PSPP INSTALLATION; COOLING COIL AIRFLOW & FAN WATT DRAW TEST

    E-Print Network [OSTI]

    STATE OF CALIFORNIA HSPP/PSPP INSTALLATION; COOLING COIL AIRFLOW & FAN WATT DRAW TEST CEC-CF-6R/PSPP Installation; Cooling Coil Airflow & Fan Watt Draw Test (Page 1 of 3) Site Address: Enforcement Agency: Permit), and Permanently installed Static Pressure Probe (PSPP) in the supply plenum When the Certificate of Compliance (CF

  17. Solar Power Systems Find A Professional Solar Energy Installer For Any

    E-Print Network [OSTI]

    Lovley, Derek

    Solar Power Systems Find A Professional Solar Energy Installer For Any Type Of System www.CleanEnergyAuthority.com Install Solar Panels Enter Your Zip Code & Connect To Pre-Screened Solar Panel Installers www.ServiceMagic.com Biomass Pumps Reliable metering for apps from microflow to scale-up & pilot plant www.isco.com The Solar

  18. PIBASE.ligands installation guide. ver 200905 Fred P. Davis, HHMI-JFRC

    E-Print Network [OSTI]

    Eddy, Sean

    SQL interface, a software package is also available that enables a web interface to the database. The database Web interface To install the web interface to the PIBASE.ligands database, you must first have a working PIBASE web server installed. Once you have the PIBASE web interface installed, download the PIBASE

  19. VIOLENT FRAMES IN ACTION

    SciTech Connect (OSTI)

    Sanfilippo, Antonio P.; McGrath, Liam R.; Whitney, Paul D.

    2011-11-17T23:59:59.000Z

    We present a computational approach to radical rhetoric that leverages the co-expression of rhetoric and action features in discourse to identify violent intent. The approach combines text mining and machine learning techniques with insights from Frame Analysis and theories that explain the emergence of violence in terms of moral disengagement, the violation of sacred values and social isolation in order to build computational models that identify messages from terrorist sources and estimate their proximity to an attack. We discuss a specific application of this approach to a body of documents from and about radical and terrorist groups in the Middle East and present the results achieved.

  20. MITIGATION ACTION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn12electron 9November 6, Inapril apsapsJanuaryMITIGATION ACTION

  1. Yakima Tributary Access and Habitat Program : Action Plan Final Report 2002.

    SciTech Connect (OSTI)

    Myra, David (South Central Washington Resource Conservation and Development Council, Ellensburg, WA); Ready, Carol A. (Kittitas County Water Purveyors, Ellensburg, WA)

    2003-04-01T23:59:59.000Z

    This report covers activities conducted by the Yakima Tributary Access and Habitat Program under Bonneville Power Administration (BPA) grant project No. 2002-025-00 for fiscal year 2002. The Yakima Tributary Access and Habitat Program (YTAHP, Program) was organized to restore salmonid passage to Yakima tributaries that historically supported salmonids and improve habitat in areas where access is restored. Specifically, this program is designed to (a) screen unscreened diversion structures to prevent fish entrainment into artificial waterways; (b) provide for fish passage at man-made barriers, such as diversion dams, culverts, siphons and bridges; and (c) provide information and assistance to landowners interested in to contributing to the improvement of water quality, water reliability and stream habitat. The YTAHP developed from a number of groups actively engaged in watershed management, and/or habitat restoration within the Yakima River Basin. These groups include the Washington State Fish and Wildlife (WDFW), Kittitas County Conservation District (KCCD), North Yakima Conservation District (NYCD), Kittitas County Water Purveyors (KCWP), and Ahtanum Irrigation District (AID). The US Bureau of Reclamation (Reclamation) and Yakama Nation (YN) both participated in the development of the objectives of YTAHP. Other entities that will be involved during permitting or project review may include the YN, the federal Natural Resources Conservation Service (NRCS), the US Fish and Wildlife Service (USFWS), the National Marine Fisheries Service (NMFS), and US Army Corps of Engineers (COE). Achievements of YTAHP with BPA Action Plan funding during FY 2002 were to: (1) Establish contracts with RC&D and YTAHP participants. (2) Determine contract mechanism for MWH engineering services. (3) Provide engineering designs and services for 11 early action projects, including inverted siphons, pump and gravity diversion screening, diversion metering, rock weirs for improved fish passage, headgates and fishways. These designs were used to submit for project implementation funding through the WA Salmon Recovery Funding Board. (4) Complete 6 early action projects on Ahtanum Creek--One gravity diversion was replaced with a pump and pump end screen and 5 pump end screens were installed. (5) Conduct two topographic surveys--For the City of Yakima on the Fruitvale diversion for the North Yakima Conservation District to support the installation of a pumping plant which would eliminate the need to divert directly from the Naches River and build the gravel berm each year during low flows. For the Taylor Ditch system for the North Yakima Conservation District to support as feasibility of opening the ditch for habitat and at the same time maintaining irrigation deliveries. (6) Procure materials for use in future YTAHP projects, including siphon pipe, delivery pipe, rock, screens, and water meters. These materials will act as match and support the completion of these subsequent YTAHP projects. Overall, with broad agency support and Action Plan funding through BPA, the YTAHP has achieved substantial enhancements that support aquatic species and which will leverage subsequent work through engineering designs and materials. The program was also able to establish the personnel and equipment support for beginning the stream assessment process on tributaries in Yakima and Kittitas Counties. Completion of this year's effort has provided significant inroads to working on the private lands in two counties which will be vital to future efforts by YTAHP and others to protect and enhance Yakima River Basin habitat.

  2. Group action in topos quantum physics

    SciTech Connect (OSTI)

    Flori, C. [Perimeter Institute for Theoretical Physics, 31 Caroline Street N, Waterloo, Ontario N2L 2Y5 (Canada)] [Perimeter Institute for Theoretical Physics, 31 Caroline Street N, Waterloo, Ontario N2L 2Y5 (Canada)

    2013-03-15T23:59:59.000Z

    Topos theory has been suggested first by Isham and Butterfield, and then by Isham and Doering, as an alternative mathematical structure within which to formulate physical theories. In particular, it has been used to reformulate standard quantum mechanics in such a way that a novel type of logic is used to represent propositions. In this paper, we extend this formulation to include the notion of a group and group transformation in such a way that we overcome the problem of twisted presheaves. In order to implement this we need to change the type of topos involved, so as to render the notion of continuity of the group action meaningful.

  3. STUDENT EMPLOYMENT Student Involvement Outcomes

    E-Print Network [OSTI]

    de Lijser, Peter

    STUDENT EMPLOYMENT Student Involvement Outcomes reflective assessment High impact practices. Employment Structure ASI employs approximately 645 staff, interns, and volunteers on average during the fall and spring semesters. In spring 2013, ASI employed: · 42 Interns · 59 Professional Staff Members · 162

  4. REMEDIAL ACTION PLAN

    E-Print Network [OSTI]

    Inactive Uranium; Mill Tailings Site; Uranium Mill Tremedial

    1990-01-01T23:59:59.000Z

    designated site consists of the 111-acre tailings pile, the mill yard, and piles of demolition rubble awaiting burial. The site contains 2.659 million cubic yards of tailings including 277,000 cubic yards of contaminated material in the mill yard, ore storage area, and Ann Lee Mine area; 151,000 cubic yards in the protore storage and leach pad areas; and 664,000 cubic yards of windblown contaminated soil, including excess soil that would result from excavation. Remedial action The remedial action will start with the excavation of windblown contaminated material and placement around the west, south, and east sides of the pile to buttress the slopes for increased stability. Most of the demolition rubble will be placed in the southern part of the pile and be covered with tailings. The northern part of the tailings pile (one million cubic yards) will then be excavated and placed on the south part of the pile to reduce the size of the disposal cell footprint. Demolition rubble that

  5. IGSHPA Continuing Education Credit Form Accreditation for IGSHPA accredited installers is valid for three years. During those three years an installer must accumulate eight

    E-Print Network [OSTI]

    for three years. During those three years an installer must accumulate eight points to renew the accreditation. The points can be accumulated in three ways - through employment, membership in an approved The installer may accumulate 4 points by remaining continually employed for three years in the combined

  6. Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007

    E-Print Network [OSTI]

    Wiser, Ryan

    2009-01-01T23:59:59.000Z

    The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

  7. Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

    E-Print Network [OSTI]

    Barbose, Galen L

    2010-01-01T23:59:59.000Z

    The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

  8. Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

    E-Print Network [OSTI]

    Barbose, Galen

    2011-01-01T23:59:59.000Z

    The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

  9. Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

    E-Print Network [OSTI]

    Barbose, Galen

    2011-01-01T23:59:59.000Z

    from 1998-2009 Tracking the Sun III: The Installed Cost ofSystems MW Total Tracking the Sun III: The Installed Cost ofthrough 2009. Tracking the Sun III: The Installed Cost of

  10. Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

    E-Print Network [OSTI]

    Barbose, Galen L

    2010-01-01T23:59:59.000Z

    Systems MW Total Tracking the Sun II: The Installed Cost of PhotovoltaicsSystems Tracking the Sun II: The Installed Cost of PhotovoltaicsSystem Size Tracking the Sun II: The Installed Cost of Photovoltaics

  11. Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007

    E-Print Network [OSTI]

    Wiser, Ryan

    2009-01-01T23:59:59.000Z

    systems Tracking the Sun: The Installed Cost of PhotovoltaicsSystem Size Tracking the Sun: The Installed Cost of Photovoltaicssystem size, for PV Tracking the Sun: The Installed Cost of Photovoltaics

  12. Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

    E-Print Network [OSTI]

    Barbose, Galen

    2011-01-01T23:59:59.000Z

    Systems MW Total Tracking the Sun III: The Installed Cost of PhotovoltaicsSystem Size Tracking the Sun III: The Installed Cost of PhotovoltaicsSystems >10 kW Tracking the Sun III: The Installed Cost of Photovoltaics

  13. Installation of Window Air Conditioners Page 1 of 2 Virginia Polytechnic Institute and State University No. 5705 Rev.: 3

    E-Print Network [OSTI]

    Buehrer, R. Michael

    Installation of Window Air Conditioners Page 1 of 2 Virginia Polytechnic Institute and State __________________________________________________________________________________ Subject: Installation of Window Air Conditioners........................................................................................................................................1 1. Purpose To define a policy for installation of window air conditioners that avoids exterior

  14. Monte Carlo Simulation Tool Installation and Operation Guide

    SciTech Connect (OSTI)

    Aguayo Navarrete, Estanislao; Ankney, Austin S.; Berguson, Timothy J.; Kouzes, Richard T.; Orrell, John L.; Troy, Meredith D.; Wiseman, Clinton G.

    2013-09-02T23:59:59.000Z

    This document provides information on software and procedures for Monte Carlo simulations based on the Geant4 toolkit, the ROOT data analysis software and the CRY cosmic ray library. These tools have been chosen for its application to shield design and activation studies as part of the simulation task for the Majorana Collaboration. This document includes instructions for installation, operation and modification of the simulation code in a high cyber-security computing environment, such as the Pacific Northwest National Laboratory network. It is intended as a living document, and will be periodically updated. It is a starting point for information collection by an experimenter, and is not the definitive source. Users should consult with one of the authors for guidance on how to find the most current information for their needs.

  15. Solar space heating installed at Kansas City, Kansas. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-05-01T23:59:59.000Z

    The solar energy system was constructed with the new 48,800 square feet warehouse to heat the warehouse area of about 39,000 square feet while the auxiliary energy system heats the office area of about 9800 square feet. The building is divided into 20 equal units, and each has its own solar system. The modular design permits the flexibility of combining multiple units to form offices or warehouses of various size floor areas as required by a tenant. Each unit has 20 collectors which are mounted in a single row. The collectors, manufactured by Solaron Corporation, are double glazed flat plate collectors with a gross area of 7800 ft/sup 2/. Air is heated either through the collectors or by the electric resistance duct coils. No freeze protection or storage is required for this system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  16. Gas turbine nozzle vane insert and methods of installation

    DOE Patents [OSTI]

    Miller, William John (Simpsonville, SC); Predmore, Daniel Ross (Clifton Park, NY); Placko, James Michael (West Chester, OH)

    2002-01-01T23:59:59.000Z

    A pair of hollow elongated insert bodies are disposed in one or more of the nozzle vane cavities of a nozzle stage of a gas turbine. Each insert body has an outer wall portion with apertures for impingement-cooling of nozzle wall portions in registration with the outer wall portion. The insert bodies are installed into the cavity separately and spreaders flex the bodies toward and to engage standoffs against wall portions of the nozzle whereby the designed impingement gap between the outer wall portions of the insert bodies and the nozzle wall portions is achieved. The spreaders are secured to the inner wall portions of the insert bodies and the bodies are secured to one another and to the nozzle vane by welding or brazing.

  17. Information handbook on independent spent fuel storage installations

    SciTech Connect (OSTI)

    Raddatz, M.G.; Waters, M.D.

    1996-12-01T23:59:59.000Z

    In this information handbook, the staff of the U.S. Nuclear Regulatory Commission describes (1) background information regarding the licensing and history of independent spent fuel storage installations (ISFSIs), (2) a discussion of the licensing process, (3) a description of all currently approved or certified models of dry cask storage systems (DCSSs), and (4) a description of sites currently storing spent fuel in an ISFSI. Storage of spent fuel at ISFSIs must be in accordance with the provisions of 10 CFR Part 72. The staff has provided this handbook for information purposes only. The accuracy of any information herein is not guaranteed. For verification or for more details, the reader should refer to the respective docket files for each DCSS and ISFSI site. The information in this handbook is current as of September 1, 1996.

  18. Installation of geosynthetic clay liners at California MSW landfills

    SciTech Connect (OSTI)

    Snow, M.; Jesionek, K.S.; Dunn, R.J.; Kavazanjian, E. Jr.

    1997-11-01T23:59:59.000Z

    The California regulations for liner systems at municipal solid waste (MSW) landfills require that alternatives to the prescriptive federal Subtitle D liner system have a containment capability greater than that of the prescriptive system. Regulators may also require a demonstration that use of the prescriptive system is burdensome prior to approval of an alternative liner design. This paper presents seven case histories of the design and installation of geosynthetic clay liners (GCL) as an alternative to the low-permeability soil component of the prescriptive Subtitle D composite liner system at MSW landfills in California. These case histories cover GCLs from different manufacturers and landfill sites with a wide range of conditions including canyon landfills with slopes as steep as 1H:1V.

  19. Safety of Hydrogen Systems Installed in Outdoor Enclosures

    SciTech Connect (OSTI)

    Barilo, Nick F.

    2013-11-06T23:59:59.000Z

    The Hydrogen Safety Panel brings a broad cross-section of expertise from the industrial, government, and academic sectors to help advise the U.S. Department of Energy’s (DOE) Fuel Cell Technologies Office through its work in hydrogen safety, codes, and standards. The Panel’s initiatives in reviewing safety plans, conducting safety evaluations, identifying safety-related technical data gaps, and supporting safety knowledge tools and databases cover the gamut from research and development to demonstration and deployment. The Panel’s recent work has focused on the safe deployment of hydrogen and fuel cell systems in support of DOE efforts to accelerate fuel cell commercialization in early market applications: vehicle refueling, material handling equipment, backup power for warehouses and telecommunication sites, and portable power devices. This paper resulted from observations and considerations stemming from the Panel’s work on early market applications. This paper focuses on hydrogen system components that are installed in outdoor enclosures. These enclosures might alternatively be called “cabinets,” but for simplicity, they are all referred to as “enclosures” in this paper. These enclosures can provide a space where a flammable mixture of hydrogen and air might accumulate, creating the potential for a fire or explosion should an ignition occur. If the enclosure is large enough for a person to enter, and ventilation is inadequate, the hydrogen concentration could be high enough to asphyxiate a person who entered the space. Manufacturers, users, and government authorities rely on requirements described in codes to guide safe design and installation of such systems. Except for small enclosures used for hydrogen gas cylinders (gas cabinets), fuel cell power systems, and the enclosures that most people would describe as buildings, there are no hydrogen safety requirements for these enclosures, leaving gaps that must be addressed. This paper proposes that a technical basis be developed to enable code bodies to write requirements for the range of enclosures from the smallest to the largest.

  20. Experimental Evaluation of Installed Cooking Exhaust Fan Performance

    SciTech Connect (OSTI)

    Singer, Brett C.; Delp, William W.; Apte, Michael G.

    2010-11-01T23:59:59.000Z

    The installed performance of cooking exhaust fans was evaluated through residential field experiments conducted on a sample of 15 devices varying in design and other characteristics. The sample included two rear downdraft systems, two under-cabinet microwave over range (MOR) units, three different installations of an under-cabinet model with grease screens across the bottom and no capture hood, two devices with grease screens covering the bottom of a large capture hood (one under-cabinet, one wall-mount chimney), four under-cabinet open hoods, and two open hoods with chimney mounts over islands. Performance assessment included measurement of airflow and sound levels across fan settings and experiments to quantify the contemporaneous capture efficiency for the exhaust generated by natural gas cooking burners.Capture efficiency is defined as the fraction of generated pollutants that are removed through the exhaust and thus not available for inhalation of household occupants. Capture efficiency (CE) was assessed for various configurations of burner use (e.g., single front, single back, combination of one front and one back, oven) and fan speed setting. Measured airflow rates were substantially lower than the levels noted in product literature for many of the units. This shortfall was observed for several units costing in excess of $1000. Capture efficiency varied widely (from<5percent to roughly 100percent) across devices and across conditions for some devices. As expected, higher capture efficiencies were achieved with higher fan settings and the associated higher air flow rates. In most cases, capture efficiencies were substantially higher for rear burners than for front burners. The best and most consistent performance was observed for open hoods that covered all cooktop burners and operated at higher airflow rates. The lowest capture efficiencies were measured when a front burner was used with a rear backdraft system or with lowest fan setting for above the range systems that do not cover the front burners.

  1. Underground Storage Tank Regulations for the Certification of Persons Who Install, Alter, and Remove Underground Storage Tanks (Mississippi)

    Broader source: Energy.gov [DOE]

    The Underground Storage Tank Regulations for the Certification of Persons who Install, Alter, and Remove Underground Storage Tanks applies to any project that will install, alter or remove...

  2. Philadelphia, Pennsylvania: Solar in Action (Brochure), Solar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Philadelphia, Pennsylvania: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Philadelphia, Pennsylvania: Solar in Action (Brochure),...

  3. Discussion: Week 2. Evaluating green actions

    E-Print Network [OSTI]

    Gille, Sarah T.

    housing for people who can't afford it, installing solar hot water heaters to replace diesel systems

  4. Guam Energy Action Plan

    SciTech Connect (OSTI)

    Conrad, M. D.; Ness, J. E.

    2013-07-01T23:59:59.000Z

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  5. Viewing biology in action | EMSL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    biology in action Released: June 11, 2014 DOE-funded pilot program will create mesoscale biological imaging platform James Evans EMSL received first-year funding of almost...

  6. Inequality, Coalitions and Collective Action

    E-Print Network [OSTI]

    Bardhan, Pranab; Singh, Nirvikar

    2004-01-01T23:59:59.000Z

    Inequality, Coalitions and Collective Action Pranab K.coalitions) and underlying inequality in the distribution ofO10, P0 Key Words: inequality, self-enforcing, collective

  7. QCD Thermodynamics with Improved Actions

    E-Print Network [OSTI]

    Karsch, Frithjof; Engels, J; Joswig, R; Laermann, E; Peikert, A; Petersson, B

    1996-01-01T23:59:59.000Z

    The thermodynamics of the SU(3) gauge theory has been analyzed with tree level and tadpole improved Symanzik actions. A comparison with the continuum extrapolated results for the standard Wilson action shows that improved actions lead to a drastic reduction of finite cut-off effects already on lattices with temporal extent $N_\\tau=4$. Results for the pressure, the critical temperature, surface tension and latent heat are presented. First results for the thermodynamics of four-flavour QCD with an improved staggered action are also presented. They indicate similarly large improvement factors for bulk thermodynamics.

  8. Expert Meeting Report: Achieving the Best Installed Performance from High-Efficiency Residential Gas Furnaces

    SciTech Connect (OSTI)

    Brand, L.

    2012-03-01T23:59:59.000Z

    This report describes a Building America expert meeting hosted on July 28, 2011, by the Partnership for Advanced Residential Retrofit team. The purpose of this meeting was to identify installation practices that provide the best installed efficiency for residential gas furnaces, explain how AFUE and field efficiency can differ, and investigate the impact of installation practices on the efficiency and long-term durability of the furnace.

  9. BIOMASS ACTION PLAN FOR SCOTLAND

    E-Print Network [OSTI]

    BIOMASS ACTION PLAN FOR SCOTLAND #12; #12;© Crown copyright 2007 ISBN: 978 0 7559 6506 9 Scottish% recyclable. #12;A BIOMASS ACTION PLAN FOR SCOTLAND #12;#12;1 CONTENTS FOREWORD 3 1. EXECUTIVE SUMMARY 5 2. INTRODUCTION 9 3. WIDER CONTEXT 13 4. SCOTLAND'S ROLE IN THE UK BIOMASS STRATEGY 17 5. BIOMASS HEATING 23 6

  10. STUDENT DISCIPLINARY ACTION FORM INSTRUCTIONS

    E-Print Network [OSTI]

    Baltisberger, Jay H.

    STUDENT DISCIPLINARY ACTION FORM INSTRUCTIONS Labor Program Office Berea College While one across campus. The "Student Disciplinary Action Form" was designed to provide labor supervisors directly with the student and discuss the matter in private. Calmly discuss the offense and the corrective

  11. ACTION PLAN leading the way...

    E-Print Network [OSTI]

    already installed more than 5,500 kW of photovoltaic panels on their campuses. These systems include five footprint. The large 5,300 KW solar plant is owned by a third party. While the environmental benefits for in the long term of the CAP. Two megawatt solar array at Chrisman Field One of the Largest Solar Plants

  12. Integrated dynamic landscape analysis and modeling system (IDLAMS) : installation manual.

    SciTech Connect (OSTI)

    Li, Z.; Majerus, K. A.; Sundell, R. C.; Sydelko, P. J.; Vogt, M. C.

    1999-02-24T23:59:59.000Z

    The Integrated Dynamic Landscape Analysis and Modeling System (IDLAMS) is a prototype, integrated land management technology developed through a joint effort between Argonne National Laboratory (ANL) and the US Army Corps of Engineers Construction Engineering Research Laboratories (USACERL). Dr. Ronald C. Sundell, Ms. Pamela J. Sydelko, and Ms. Kimberly A. Majerus were the principal investigators (PIs) for this project. Dr. Zhian Li was the primary software developer. Dr. Jeffrey M. Keisler, Mr. Christopher M. Klaus, and Mr. Michael C. Vogt developed the decision analysis component of this project. It was developed with funding support from the Strategic Environmental Research and Development Program (SERDP), a land/environmental stewardship research program with participation from the US Department of Defense (DoD), the US Department of Energy (DOE), and the US Environmental Protection Agency (EPA). IDLAMS predicts land conditions (e.g., vegetation, wildlife habitats, and erosion status) by simulating changes in military land ecosystems for given training intensities and land management practices. It can be used by military land managers to help predict the future ecological condition for a given land use based on land management scenarios of various levels of training intensity. It also can be used as a tool to help land managers compare different land management practices and further determine a set of land management activities and prescriptions that best suit the needs of a specific military installation.

  13. COMPREHENSIVE DIAGNOSTIC AND IMPROVEMENT TOOLS FOR HVAC-SYSTEM INSTALLATIONS IN LIGHT COMMERCIAL BUILDINGS

    SciTech Connect (OSTI)

    Abram Conant; Mark Modera; Joe Pira; John Proctor; Mike Gebbie

    2004-10-31T23:59:59.000Z

    Proctor Engineering Group, Ltd. (PEG) and Carrier-Aeroseal LLP performed an investigation of opportunities for improving air conditioning and heating system performance in existing light commercial buildings. Comprehensive diagnostic and improvement tools were created to address equipment performance parameters (including airflow, refrigerant charge, and economizer operation), duct-system performance (including duct leakage, zonal flows and thermal-energy delivery), and combustion appliance safety within these buildings. This investigation, sponsored by the National Energy Technology Laboratory, a division of the U.S. Department of Energy, involved collaboration between PEG and Aeroseal in order to refine three technologies previously developed for the residential market: (1) an aerosol-based duct sealing technology that allows the ducts to be sealed remotely (i.e., without removing the ceiling tiles), (2) a computer-driven diagnostic and improvement-tracking tool for residential duct installations, and (3) an integrated diagnosis verification and customer satisfaction system utilizing a combined computer/human expert system for HVAC performance. Prior to this work the aerosol-sealing technology was virtually untested in the light commercial sector--mostly because the savings potential and practicality of this or any other type of duct sealing had not been documented. Based upon the field experiences of PEG and Aeroseal, the overall product was tailored to suit the skill sets of typical HVAC-contractor personnel.

  14. Consider Installing Turbulators on Two- and Three-Pass Firetube Boilers

    SciTech Connect (OSTI)

    Not Available

    2006-01-01T23:59:59.000Z

    This revised ITP tip sheet on installing turbulators on firetube boilers provides how-to advice for improving the system using low-cost, proven practices and technologies.

  15. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    to Drive Wind Development. . . . . . . . . . . . . . .5 GE Wind Is the Dominant Turbine Manufacturer, with SiemensAnnual Report on U.S. Wind Power Installation, Cost, and

  16. Fiscal year 1996 well installation program summary, Y-12 Plant Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1997-04-01T23:59:59.000Z

    This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1996 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge Tennessee. Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Two groundwater monitoring wells were installed during the FY 1996 drilling program. One of the groundwater monitoring wells was installed in the Lake Reality area and was of polyvinyl chloride screened construction. The other well, installed near the Ash Disposal Basin, was of stainless steel construction.

  17. Energy efficiency campaign for residential housing at the Fort Lewis army installation

    SciTech Connect (OSTI)

    AH McMakin; RE Lundgren; EL Malone

    2000-02-23T23:59:59.000Z

    In FY1999, Pacific Northwest National Laboratory conducted an energy efficiency campaign for residential housing at the Fort Lewis Army Installation near Tacoma, Washington. Preliminary weather-corrected calculations show energy savings of 10{percent} from FY98 for energy use in family housing. This exceeded the project's goal of 3{percent}. The work was funded by the U.S. DOEs Federal Energy Management Program (FEMP), Office of Energy Efficiency and Renewable Energy. The project adapted FEMP's national ``You Have the Power Campaign'' at the local level, tailoring it to the military culture. The applied research project was designed to demonstrate the feasibility of tailored, research-based strategies to promote energy conservation in military family housing. In contrast to many energy efficiency efforts, the campaign focused entirely on actions residents could take in their own homes, as opposed to technology or housing upgrades. Behavioral change was targeted because residents do not pay their own utility bills; thus other motivations must drive personal energy conservation. This campaign augments ongoing energy savings from housing upgrades carried out by Fort Lewis. The campaign ran from September 1998 through August 1999. The campaign strategy was developed based on findings from previous research and on input from residents and officials at Fort Lewis. Energy use, corrected to account for weather differences, was compared with the previous year's use. Survey responses from 377 of Fort Lewis residents of occupied housing showed that the campaign was moderately effective in promoting behavior change. Of those who were aware of the campaign, almost all said they were now doing one or more energy-efficient things that they had not done before. Most people were motivated by the desire to do the right thing and to set a good example for their children. They were less motivated by other factors.

  18. INSTALLATION CERTIFICATE CF-6R-MECH-27-HERS Maximum Rated Total Cooling Capacity (Page 1 of 2)

    E-Print Network [OSTI]

    INSTALLATION CERTIFICATE CF-6R-MECH-27-HERS Maximum Rated Total Cooling Capacity (Page 1 of 2) Site of the installed system (Btu/hr) 3b Sum of the ARI Rated Total Cooling Capacities of multiple systems installed Cooling Capacities of the installed cooling systems must be calculated and entered in row 3b. 4a MRTCC

  19. Preliminary assessment report for Army Aviation Support Facility 2, Installation 25075, Westover Air Force Base, Chicopee, Massachusetts. Installation Restoration Program

    SciTech Connect (OSTI)

    Haffenden, R.; Flaim, S.

    1993-08-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Massachusetts Army National Guard (MAARNG) property known as the Army Aviation Support Facility 2 (AASF 2) near Chicopee, Massachusetts. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. The AASF 2 is a 10-acre site located in the western portion of Massachusetts, in the town of Chicopee, in the county of Hampden. The facilities included in this PA are Building 7400, adjacent paved areas, grassy areas, and the hazardous waste drum storage buildings. The environmentally significant operations (ESOS) associated with the property are (1) the waste drum storage area, (2) abandoned underground storage tanks (USTs), and (3) refueling activities.

  20. Design and Installation of a Disposal Cell Cover Field Test

    SciTech Connect (OSTI)

    Benson, C.H. [University of Wisconsin–Madison, Madison, Wisconsin; Waugh, W.J. [S.M. Stoller Corporation, Grand Junction, Colorado; Albright, W.H. [Desert Research Institute, Reno, Nevada; Smith, G.M. [Geo-Smith Engineering, Grand Junction, Colorado; Bush, R.P. [U.S. Department of Energy, Grand Junction, Colorado

    2011-02-27T23:59:59.000Z

    The U.S. Department of Energy’s Office of Legacy Management (LM) initiated a cover assessment project in September 2007 to evaluate an inexpensive approach to enhancing the hydrological performance of final covers for disposal cells. The objective is to accelerate and enhance natural processes that are transforming existing conventional covers, which rely on low-conductivity earthen barriers, into water balance covers, that store water in soil and release it as soil evaporation and plant transpiration. A low conductivity cover could be modified by deliberately blending the upper layers of the cover profile and planting native shrubs. A test facility was constructed at the Grand Junction, Colorado, Disposal Site to evaluate the proposed methodology. The test cover was constructed in two identical sections, each including a large drainage lysimeter. The test cover was constructed with the same design and using the same materials as the existing disposal cell in order to allow for a direct comparison of performance. One test section will be renovated using the proposed method; the other is a control. LM is using the lysimeters to evaluate the effectiveness of the renovation treatment by monitoring hydrologic conditions within the cover profile as well as all water entering and leaving the system. This paper describes the historical experience of final covers employing earthen barrier layers, the design and operation of the lysimeter test facility, testing conducted to characterize the as-built engineering and edaphic properties of the lysimeter soils, the calibration of instruments installed at the test facility, and monitoring data collected since the lysimeters were constructed.

  1. actions significant actions: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Commitment in January 2009. In doing so, he joined more than 600 presidents to achieve climate neutrality as soon as possible. 2. Initiate two or more tangible actions to reduce...

  2. Mind Out of Action: The Intentionality of Automatic Actions 

    E-Print Network [OSTI]

    Di Nucci, Ezio

    2008-01-01T23:59:59.000Z

    We think less than we think. My thesis moves from this suspicion to show that standard accounts of intentional action can't explain the whole of agency. Causalist accounts such as Davidson's and Bratman's, according to ...

  3. RCRA corrective action: Work plans

    SciTech Connect (OSTI)

    Not Available

    1995-02-01T23:59:59.000Z

    This Information Brief describes the work plans that owners/operators may have to prepare in conjunction with the performance of corrective action for compliance with RCRA guidelines. In general, the more complicated the performance of corrective action appears from the remedial investigation and other analyses, the more likely it is that the regulator will impose work plan requirements. In any case, most owner/operators will prepare work plans in conjunction with the performance of corrective action processes as a matter of best engineering management practices.

  4. Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations

    SciTech Connect (OSTI)

    Callahan, M.; Anderson, K.; Booth, S.; Katz, J.; Tetreault, T.

    2011-09-01T23:59:59.000Z

    Report highlights the increase in resources, project speed, and scale that is required to achieve the U.S. Department of Defense (DoD) energy efficiency and renewable energy goals and summarizes the net zero energy installation assessment (NZEI) process and the lessons learned from NZEI assessments and large-scale renewable energy projects implementations at DoD installations.

  5. Installation of a bioreactor to the controller after sterilization for Pichia

    E-Print Network [OSTI]

    Strynadka, Natalie

    Part II Installation of a bioreactor to the controller after sterilization for Pichia Part II Installation of a bioreactor to the controller after sterilization for Pichia Prepared by Sung-Hye Hong sunghye jacket 1) Put the heating jacket around the bioreactor. SeptumSeptum TempTemp MotorMotorpHpH Mt-OHMt-OH d

  6. Installation of a bioreactor to the controller after sterilization for E.coli

    E-Print Network [OSTI]

    Strynadka, Natalie

    Part II Installation of a bioreactor to the controller after sterilization for E.coli Part II Installation of a bioreactor to the controller after sterilization for E.coli Prepared by Sung-Hye Hong sunghye jacketheating jacket 1) Put the heating jacket around the bioreactor. SeptumSeptum TempTemp MotorMotorpHpH dO2d

  7. Siphon penstock installations at hydroelectric projects: A survey of design, construction and operating experience

    SciTech Connect (OSTI)

    Burgoine, D.; Rodrigue, P.; Tarbell, J.C. (Acres International Corp., Amherst, NY (USA); Acres International Corp., Amherst, NY (USA). Mechanical Engineering Dept.; Acres International Corp., Amherst, NY (USA))

    1989-01-01T23:59:59.000Z

    There can be advantages to using siphon penstocks at small hydro projects, particularly those constructed at existing dams. One problem, however, is a lack of documentation of siphon penstock installations. The design considerations, construction and operating aspects of siphon penstock installations are described here. 4 figs., 1 tab.

  8. Solar Energy Development onSolar Energy Development on DoD Installations in the

    E-Print Network [OSTI]

    Solar Energy Development onSolar Energy Development on DoD Installations in the Mojave & Colorado and Implications fReport is available for download at: http://www.icfi.com/insights/reports/2012/full-report-solar the technical and economic potential to site solar on 9 major DoD installations in the Mojave and Colorado

  9. Planning and Installation Guide: North Carolina Compressed Natural Gas Fueling Stations

    E-Print Network [OSTI]

    1 Planning and Installation Guide: North Carolina Compressed Natural Gas Fueling Stations Introduction Are you considering installing a compressed natural gas (CNG) fueling station for your fleet to provide your fleet with fuel. One resource for locating and identifying public compressed natural gas

  10. Thermal Performance Impacts of Center-of-Glass Deflections in Installed Insulating

    E-Print Network [OSTI]

    LBNL-5800E Thermal Performance Impacts of Center-of- Glass Deflections in Installed Insulating Laboratory Windows and Envelope Materials Group Building Technology and Urban Systems Department: temperature difference Thermal Performance Impacts of Center-of-Glass Deflections in Installed Insulating

  11. Installation This manual is available in English on the enclosed CD.

    E-Print Network [OSTI]

    van Hemmen, J. Leo

    data center design and construction. This Publication has been compiled in good faith by American PowerInstallation InRow® RD Air Cooled ACRD100 ACRD101 #12;This manual is available in English Conversion Corpo- ration assumes no liability for damages, violations of codes, improper installation, system

  12. Volume XIX, No. 1 A publication of the U.S. Army Installation Management Command

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Volume XIX, No. 1 A publication of the U.S. Army Installation Management Command January -- the New Landscape #12;Public Works Digest · January/February 2007 Public Works Digest is an unofficial publication of the U.S. Army Installation Management Command, under AR 360-1, The Army Public Affairs Program

  13. Background: Subsurface Water Retention Technology (SWRT) Durable and easy to install: Water

    E-Print Network [OSTI]

    Background: Subsurface Water Retention Technology (SWRT) Benefits Durable and easy to install: Water retaining membranes can last at least 40 years and can be installed quickly and costeffectively permeable marginal soils converting them to much higher production levels of food crops. Better water

  14. Solar heating and hot water system installed at Charlotte Memorial Hospital, Charlotte, North Carolina. Final report

    SciTech Connect (OSTI)

    None

    1981-05-01T23:59:59.000Z

    Included in this report is detailed information regarding the design and installation of a heating and hot water system in a commercial application. This information includes descriptions of system and building, design philosophy, control logic operation modes, design and installation drawing and a brief description of problems encountered and their solutions.

  15. INFO-F-309 Administration des Systmes TP1: Installation de Linux et gestion des packages

    E-Print Network [OSTI]

    Collette. Sébastien

    INFO-F-309 ­ Administration des Systčmes TP1: Installation de Linux et gestion des packagesBox. Ensuite nous verrons comment fonctionne la gestion de packages, la mise ŕ jour du systčme et l la gestion de packages. 2 Installation de Linux 2.1 Préparation Surtout lorsqu'il s'agit d'un serveur

  16. An improved approximation algorithm for the uncapacitated facility location problem with service installation costs

    E-Print Network [OSTI]

    Zhang, Shuzhong

    installation costs Dachuan Xua,, , Shuzhong Zhangb a Department of Applied Mathematics, Beijing University of Technology, 100 Pingleyuan, Chaoyang District, Beijing 100022, P.R. China b Department of Systems Engineering In this paper, we study the uncapacitated facility location problem with service installation costs depending

  17. Climate Action Plan (New Orleans)

    Broader source: Energy.gov [DOE]

    New Orleans' Climate Action Plan will provide a road map to reach the City's greenhouse gas (GHG) reduction goal by 2030 while orchestrating its adaptation to climate change. The CAP will outline...

  18. ICDF Complex Remedial Action Report

    SciTech Connect (OSTI)

    W. M. Heileson

    2007-09-26T23:59:59.000Z

    This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

  19. Climate Action Plan (Ontario, Canada)

    Broader source: Energy.gov [DOE]

    Climate Ready, Ontario's Adaptation Strategy and Action Plan, outlines the problems, goals, and key strategies for the province's approach to climate change and the problems it poses. The Plan...

  20. UCSF Sustainability Action Plan: Executive Summary

    E-Print Network [OSTI]

    Yamamoto, Keith

    UCSF Sustainability Action Plan: Executive Summary Issue Date: April 21, 2011 #12;UCSF Sustainability Action Plan Executive Summary April 21, 2011 Page 1 Table of Contents An Introduction to the Sustainability Action Plan

  1. Public involvement in radioactive waste management decisions

    SciTech Connect (OSTI)

    NONE

    1994-04-01T23:59:59.000Z

    Current repository siting efforts focus on Yucca Mountain, Nevada, where DOE`s Office of Civilian Radioactive Waste Management (OCRWM) is conducting exploratory studies to determine if the site is suitable. The state of Nevada has resisted these efforts: it has denied permits, brought suit against DOE, and publicly denounced the federal government`s decision to study Yucca Mountain. The state`s opposition reflects public opinion in Nevada, and has considerably slowed DOE`s progress in studying the site. The Yucca Mountain controversy demonstrates the importance of understanding public attitudes and their potential influence as DOE develops a program to manage radioactive waste. The strength and nature of Nevada`s opposition -- its ability to thwart if not outright derail DOE`s activities -- indicate a need to develop alternative methods for making decisions that affect the public. This report analyzes public participation as a key component of this openness, one that provides a means of garnering acceptance of, or reducing public opposition to, DOE`s radioactive waste management activities, including facility siting and transportation. The first section, Public Perceptions: Attitudes, Trust, and Theory, reviews the risk-perception literature to identify how the public perceives the risks associated with radioactivity. DOE and the Public discusses DOE`s low level of credibility among the general public as the product, in part, of the department`s past actions. This section looks at the three components of the radioactive waste management program -- disposal, storage, and transportation -- and the different ways DOE has approached the problem of public confidence in each case. Midwestern Radioactive Waste Management Histories focuses on selected Midwestern facility-siting and transportation activities involving radioactive materials.

  2. Solar heating and hot water system installed at the Senior Citizen Center, Huntsville, Alabama. [Includes engineering drawings

    SciTech Connect (OSTI)

    Not Available

    1980-02-01T23:59:59.000Z

    Information is provided on the solar energy system installed at the Huntsville Senior Citizen Center. The solar space heating and hot water facility and the project involved in its construction are described in considerable detail and detailed drawings of the complete system and discussions of the planning, the hardware, recommendations, and other pertinent information are included. The facility was designed to provide 85 percent of the hot water and 85 percent of the space heating requirements. Two important factors concerning this project for commercial demonstration are the successful use of silicon oil as a heat transfer fluid and the architecturally aesthetic impact of a large solar energy system as a visual centerpoint. There is no overheat or freeze protection due to the characteristics of the silicon oil and the design of the system. Construction proceeded on schedule with no cost overruns. It is designed to be relatively free of scheduled maintenance, and has experienced practically no problems.

  3. Sandia National Laboratories: International Smart Grid Action...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Smart Grid Action Network Mesa del Sol Project Is Finalist for International Smart Grid Action Network 2014 Award of Excellence On July 31, 2014, in Distribution Grid Integration,...

  4. Energy Agency Coordinators for Energy Action Month

    Broader source: Energy.gov [DOE]

    Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

  5. Worldwide Energy Efficiency Action through Capacity Building...

    Open Energy Info (EERE)

    and Training (WEACT) Jump to: navigation, search Logo: Worldwide Energy Efficiency Action through Capacity Building and Training (WEACT) Name Worldwide Energy Efficiency Action...

  6. Ecology Action: Small Market Advanced Retrofit Transformation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ecology Action: Small Market Advanced Retrofit Transformation Program - 2015 Peer Review Ecology Action: Small Market Advanced Retrofit Transformation Program - 2015 Peer Review...

  7. Categorical Exclusion Determination Form Proposed Action Title...

    Broader source: Energy.gov (indexed) [DOE]

    using real utility data; (3) designing, developing, and testing the system architecture for the energy router software; and (4) installing the large-scale DNR Array Test...

  8. Uranium mill tailings remedial action project real estate management plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  9. RCRA corrective action: Action levels and media cleanup standards

    SciTech Connect (OSTI)

    Not Available

    1995-02-01T23:59:59.000Z

    This Information Brief describes how action levels (ALs), which are used to determine if it is necessary to perform a Corrective Measures Study (CMS), and media cleanup standards (MCSs), which are used to set the standards for remediation performed in conjunction with Corrective Measures Implementation (CMI) are set. It is one of a series of Information Briefs on RCRA Corrective Action. ALs are health-and-environmentally-based levels of hazardous constituents in ground water, surface water, soil, or air, determined to be indicators for protection of human health and the environment. In the corrective action process, the regulator uses ALs to determine if the owner/operator of a treatment, storage, or disposal facility is required to perform a CMS.

  10. PROJECT GOALS This project involved the development of the first Carbon

    E-Print Network [OSTI]

    emissions, which will in turn allow prioritisation of actions to reduce the ANU carbon footprint. TYPEPROJECT GOALS This project involved the development of the first Carbon Emissions Inventory report and master Excel spreadsheet Figure 1: ANU Carbon Emission by Category (t CO2e) DESCRIPTION

  11. Chiral supergravity actions and superforms

    SciTech Connect (OSTI)

    Gates, S. J. Jr.; Tartaglino-Mazzucchelli, G. [Center for String and Particle Theory, Department of Physics, University of Maryland College Park, Maryland 20742-4111 (United States); Kuzenko, S. M. [School of Physics M013, The University of Western Australia 35 Stirling Highway, Crawley W.A. 6009 (Australia)

    2009-12-15T23:59:59.000Z

    The superform construction of supergravity actions, christened the 'ectoplasm method', is based on the use of a closed super d-form in the case of d space-time dimensions. In known examples, such superforms are obtained by iteratively solving nontrivial cohomological problems. The latter usually makes this scheme no less laborious than the normal coordinate method for deriving component actions for matter-coupled supergravity. In this paper we present an alternative procedure to generate required superforms in four space-time dimensions, which makes use of self-dual vector multiplets. It provides the shortest derivation of chiral actions in two different theories: (i) N=1 old minimal supergravity; and (ii) N=2 conformal supergravity. The N=2 superform construction is developed here for the first time. Although our consideration is restricted to the case of four dimensions, a generalization to higher dimensions is plausible.

  12. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Mark Krauss

    2011-09-01T23:59:59.000Z

    The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclear explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of the CASs were sufficient to meet the DQOs and evaluate CAAs without additional investigation. As a result, further investigation of the CAU 547 CASs was not required. The following CAAs were identified for the gas sampling assemblies: (1) clean closure, (2) closure in place, (3) modified closure in place, (4) no further action (with administrative controls), and (5) no further action. Based on the CAAs evaluation, the recommended corrective action for the three CASs in CAU 547 is closure in place. This corrective action will involve construction of a soil cover on top of the gas sampling assembly components and establishment of use restrictions at each site. The closure in place alternative was selected as the best and most appropriate corrective action for the CASs at CAU 547 based on the following factors: (1) Provides long-term protection of human health and the environment; (2) Minimizes short-term risk to site workers in implementing corrective action; (3) Is easily implemented using existing technology; (4) Complies with regulatory requirements; (5) Fulfills FFACO requirements for site closure; (6) Does not generate transuranic waste requiring offsite disposal; (7) Is consistent with anticipated future land use of the areas (i.e., testing and support activities); and (8) Is consistent with other NNSS site closures where contamination was left in place.

  13. Analysis of heat pumps installed in family housing at Hunter Army Air Field

    SciTech Connect (OSTI)

    Parker, S.A.

    1994-08-01T23:59:59.000Z

    The US Army Forces Command (FORSCOM) tasked Pacific Northwest Laboratory (PNL) in support of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) to conduct a postconstruction evaluation of the air-source heat pumps installed in family housing at Hunter Army Air Field (AAF). The objective of this project was to investigate and resolve concerns about an increase in energy costs at Hunter AAF following the installation of heat pumps in November 1992. After completing several analyses and a field inspection of the heat pumps in family housing at Hunter AAF, the following conclusions were made: the installation of air-source heat pumps reduced the annual energy cost in family housing by $46,672 in 1993; the heat pump thermostat controls in Hunter AAF family housing appear to be incorrectly installed; and the Hunter AAF electric utility bill increased 10% during the first 6 months of 1993 compared to the first 6 months of 1992.

  14. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    SciTech Connect (OSTI)

    Booth, S.; Barnett, J.; Burman, K.; Hambrick, J.; Westby, R.

    2010-08-01T23:59:59.000Z

    The U.S. Department of Defense (DoD) recognizes the strategic importance of energy to its mission, and is working to reduce energy consumption and enhance energy self-sufficiency by drawing on local clean energy sources. A joint initiative formed between DoD and the U.S. Department of Energy (DOE) in 2008 to address military energy use led to a task force to examine the potential for net zero energy military installations, which would produce as much energy on site as they consume in buildings, facilities, and fleet vehicles. This report presents an assessment and planning process to examine military installations for net zero energy potential. Net Zero Energy Installation Assessment (NZEIA) presents a systematic framework to analyze energy projects at installations while balancing other site priorities such as mission, cost, and security.

  15. Retrofit Installations of Adjustable Speed Drives to Conserve Energy at Industrial Facilities

    E-Print Network [OSTI]

    Porcaro, C. R.; Galstaun, L. S.; Holmes, M. L.

    1984-01-01T23:59:59.000Z

    This paper is a progress report on a study funded by the Electrical Power Research Institute (EPRI). The purpose of the study is to identify and analyze existing installations that appear to offer opportunities for energy conservation through...

  16. PV Installation Labor Market Analysis and PV JEDI Tool Developments (Presentation)

    SciTech Connect (OSTI)

    Friedman, B.

    2012-06-01T23:59:59.000Z

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  17. Monitoring and Mitigation Alternatives for Protection of North Atlantic Right Whales during Offshore Wind Farm Installation

    SciTech Connect (OSTI)

    Carlson, Thomas J.; Halvorsen, Michele B.; Matzner, Shari; Copping, Andrea E.; Stavole, Jessica

    2012-09-01T23:59:59.000Z

    Progress report on defining and determining monitoring and mitigation measures for protecting North Atlantic Right Whales from the effects of pile driving and other activities associated with installation of offshore wind farms.

  18. Building-Integrated Photovoltaics (BIPV) in the Residential Section: An Analysis of Installed Rooftop Prices (Presentation)

    SciTech Connect (OSTI)

    James, T.; Goodrich, A.; Woodhouse, M.; Margolis, R.; Ong, S.

    2012-06-01T23:59:59.000Z

    This powerpoint presentation to be presented at the World Renewable Energy Forum on May 17, 2012, in Denver, CO, discusses building-integrated photovoltaics (BIPV) in the residential section and includes an analysis of installed rooftop prices.

  19. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    Annual Report on U.S. Wind Power Installation, Cost, and3 U.S. Wind Power Capacity Increased by 27% inAre Significant. . . . . . . 9 Wind Power Prices Are Up in

  20. Art installation of conic sea and peculiar angels and its affordances 

    E-Print Network [OSTI]

    Cooper, Trina Erica

    2009-05-15T23:59:59.000Z

    Installations attempt to expose everyday space by depicting an environment that appears normal yet has been altered in perceptibly unexpected ways. Such environments are typically designed to re-orient participants, giving them the feeling...

  1. INSTALLATION CERTIFICATE CF-6R-ENV-01 Envelope Insulation; Roofing; Fenestration (Page 1 of 3)

    E-Print Network [OSTI]

    INSTALLATION CERTIFICATE CF-6R-ENV-01 Envelope ­ Insulation; Roofing; Fenestration (Page 1 of 3:__________________________________ Brand Name:_______________________________ Thickness (inches):_________________________ Thermal:_______________________________ Thickness (inches):_________________________ Thermal Resistance (R-Value):_________________ Perimeter

  2. Atomic Energy and Radioactive Substances: Licensing and Regulation of Sites: The Nuclear Installations Regulations, 1962 

    E-Print Network [OSTI]

    Wood, Richard; Maclay, John. S.

    1962-01-01T23:59:59.000Z

    These regulations, made by the Minister of Power and the Secretary of State for Scotland acting jointly, prescribe for the purpose of subsection (1)(b) of section one of the Nuclear Installations (Licensing and Insurance) Act, 1959, certain classes...

  3. Deficiencies of Lighting Codes and Ordinances in Controlling Light Pollution from Parking Lot Lighting Installations

    E-Print Network [OSTI]

    Royal, Emily

    2012-05-31T23:59:59.000Z

    The purpose of this research was to identify the main causes of light pollution from parking lot electric lighting installations and highlight the deficiencies of lighting ordinances in preventing light pollution. Using an industry-accepted lighting...

  4. Permits to Install,New Source Review (PTI,NSR)  (Michigan)

    Broader source: Energy.gov [DOE]

    Rule 201 of the Michigan Air Pollution Control Rules requires a person to obtain an approved Permit to Install for any potential source of air pollution unless the source is exempt from the...

  5. Utility Scale Renewable Energy Development Near DOD Installations: Making the Case for Land Use Compatitbility

    Broader source: Energy.gov [DOE]

    Presentation covers Utility Scale Renewable Energy Development Near DOD Installations and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

  6. DCC Digital Curation Manual: Instalment on Open Source for Digital Curation 

    E-Print Network [OSTI]

    McHugh, Andrew

    2005-08-01T23:59:59.000Z

    Instalment on the role of open source software within the digital curation lifecycle. Describes a range of explicit digital curation application areas for open source, some examples of existing uses of open source software, ...

  7. Art installation of conic sea and peculiar angels and its affordances

    E-Print Network [OSTI]

    Cooper, Trina Erica

    2009-05-15T23:59:59.000Z

    Installations attempt to expose everyday space by depicting an environment that appears normal yet has been altered in perceptibly unexpected ways. Such environments are typically designed to re-orient participants, giving them the feeling...

  8. Consider Installing High-Pressure Boilers with Backpressure Turbine-Generators

    SciTech Connect (OSTI)

    Not Available

    2006-01-01T23:59:59.000Z

    This revised ITP tip sheet on installing high-pressure boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  9. California Solar Initiative (CSI) Thermal Program Metering Installation Guide Purpose: The purpose of this metering installation guide is to provide participating eligible contractors

    E-Print Network [OSTI]

    1 California Solar Initiative (CSI) Thermal Program Metering Installation Guide Purpose and monitoring purposes: Customer Performance Monitoring (CPM), Opt-in Measurement and Evaluation (M&E) and 70 with interpreting the following schematics. 1. Customer Performance Monitoring (CPM) For CPM, metering either

  10. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    E-Print Network [OSTI]

    De Salvo, Alessandro; The ATLAS collaboration; Smirnov, Yuri; Sanchez, Arturo

    2015-01-01T23:59:59.000Z

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original WMS and the new Panda modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over WAN. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation DB is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system i...

  11. Proposal for the award of a contract for the provision of maintenance services for electrical installations on the CERN site

    E-Print Network [OSTI]

    2014-01-01T23:59:59.000Z

    Proposal for the award of a contract for the provision of maintenance services for electrical installations on the CERN site

  12. Proposal for the award of a contract for the supply and installation of two thyristor-controlled reactors for LEP

    E-Print Network [OSTI]

    1986-01-01T23:59:59.000Z

    Proposal for the award of a contract for the supply and installation of two thyristor-controlled reactors for LEP

  13. Proposal for the Award of a Contract for the Supply and Installation of Two Thyristor-Controlled Reactor Plants

    E-Print Network [OSTI]

    1991-01-01T23:59:59.000Z

    Proposal for the Award of a Contract for the Supply and Installation of Two Thyristor-Controlled Reactor Plants

  14. Proposal for the award of a contract for the provision of electrical installation services on the CERN site

    E-Print Network [OSTI]

    2015-01-01T23:59:59.000Z

    Proposal for the award of a contract for the provision of electrical installation services on the CERN site

  15. Adjudication Concerning the Contract for the Maintenance of Pipework and Heating, Ventilating and Air-Conditioning Installations

    E-Print Network [OSTI]

    1971-01-01T23:59:59.000Z

    Adjudication Concerning the Contract for the Maintenance of Pipework and Heating, Ventilating and Air-Conditioning Installations

  16. Adjudication of a Contract for the Maintenance of Pipework and Heating, Ventilating and Air-Conditioning Installations

    E-Print Network [OSTI]

    1977-01-01T23:59:59.000Z

    Adjudication of a Contract for the Maintenance of Pipework and Heating, Ventilating and Air-Conditioning Installations

  17. Proposed Adjudication of the Contract for the Heating, Ventilating and Air Conditioning Installations for the ISR Buildings

    E-Print Network [OSTI]

    1968-01-01T23:59:59.000Z

    Proposed Adjudication of the Contract for the Heating, Ventilating and Air Conditioning Installations for the ISR Buildings

  18. Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems

    E-Print Network [OSTI]

    1996-01-01T23:59:59.000Z

    Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems

  19. Nuclear facilities: criteria for the design and operation of ventilation systems for nuclear installations other than nuclear reactors

    E-Print Network [OSTI]

    International Organization for Standardization. Geneva

    2004-01-01T23:59:59.000Z

    Nuclear facilities: criteria for the design and operation of ventilation systems for nuclear installations other than nuclear reactors

  20. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2007-04-01T23:59:59.000Z

    Corrective Action Unit (CAU) 543: Liquid Disposal Units is listed in Appendix III of the ''Federal Facility Agreement and Consent Order'' (FFACO) which was agreed to by the state of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (FFACO, 1996). CAU 543 sites are located in Areas 6 and 15 of the Nevada Test Site (NTS), which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven Corrective Action Sites (CASs) (Figure 1): CAS 06-07-01, Decon Pad; CAS 15-01-03, Aboveground Storage Tank; CAS 15-04-01, Septic Tank; CAS 15-05-01, Leachfield; CAS 15-08-01, Liquid Manure Tank; CAS 15-23-01, Underground Radioactive Material Area; and CAS 15-23-03, Contaminated Sump, Piping. All Area 15 CASs are located at the former U.S. Environmental Protection Agency (EPA) Farm, which operated from 1963 to 1981 and was used to support animal experiments involving the uptake of radionuclides. Each of the Area 15 CASs, except CAS 15-23-01, is associated with the disposal of waste effluent from Building 15-06, which was the primary location of the various tests and experiments conducted onsite. Waste effluent disposal from Building 15-06 involved piping, sumps, outfalls, a septic tank with leachfield, underground storage tanks, and an aboveground storage tank (AST). CAS 15-23-01 was associated with decontamination activities of farm equipment potentially contaminated with radiological constituents, pesticides, and herbicides. While the building structures were removed before the investigation took place, all the original tanks, sumps, piping, and concrete building pads remain in place. The Area 6 CAS is located at the Decontamination Facility in Area 6, a facility which operated from 1971 to 2001 and was used to decontaminate vehicles, equipment, clothing, and other materials that had become contaminated during nuclear testing activities. The CAS includes the effluent collection and distribution systems for Buildings 6-605, 6-606, and 6-607, which consists of septic tanks, sumps, piping, floor drains, drain trenches, cleanouts, and a concrete foundation. Additional details of the site history are provided in the CAU 543 Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2004a), and the CAU 543 Corrective Action Decision Document (CADD) (NNSA/NSO, 2005).

  1. Facility Energy Decision System (FEDS) Assessment Report for US Army Garrison, Japan - Honshu Installations

    SciTech Connect (OSTI)

    Kora, Angela R.; Brown, Daryl R.; Dixon, Douglas R.

    2010-03-09T23:59:59.000Z

    This report documents an assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Installation Management Command (IMCOM) Pacific Region Office (PARO). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at five U.S. Army Garrison-Japan (USAG-J) installations in the Honshu area, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

  2. Behavior of 10 full-scale ground anchors installed in stiff clay

    E-Print Network [OSTI]

    Powers, William Francis

    1993-01-01T23:59:59.000Z

    for Anchor Installation . Drill Bit Grout Pump Top View of Hollow Stem Auger . Typical Borehole Extensometer Typical Testing Arrangement Schematic Showing Testing Equipment Strain Indicator Box Used to Read Load Cell Equipment Used to Monitor Load... Anchors Used in Current Practice (a) Straight-Shafted; (b) Single-Underreamed; (c) Multi-Underreamed; (d) Post-Grouted Anchor T pe Grouting Technique Installation Equipment Suitable Soil T pe ~ Straight-Shafted Low Pressure Hollow Stem Auger Rotary...

  3. Installation Of Service Connections For Sensors Or Transmitters In Buried Water Pipes

    DOE Patents [OSTI]

    Burnham, Alan K. (Livermore, CA); Cooper, John F. (Oakland, CA)

    2006-02-21T23:59:59.000Z

    A system for installing warning units in a buried pipeline. A small hole is drilled in the ground to the pipeline. A collar is affixed to one of the pipes of the pipeline. A valve with an internal passage is connected to the collar. A hole is drilled in the pipe. A warning unit is installed in the pipe by moving the warning unit through the internal passage, the collar, and the hole in the pipe.

  4. Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007

    E-Print Network [OSTI]

    Wiser, Ryan

    2009-01-01T23:59:59.000Z

    10-100 kW >100 kW Tracking the Sun: The Installed Cost ofout over five years. Tracking the Sun: The Installed Cost ofU.S. from 1998-2007 Tracking the Sun: The Installed Cost of

  5. Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

    E-Print Network [OSTI]

    Barbose, Galen L

    2010-01-01T23:59:59.000Z

    2008 BACK PAGE Tracking the Sun II: The Installed Cost of10-100 kW >100 kW Tracking the Sun II: The Installed Cost ofSystems MW Total Tracking the Sun II: The Installed Cost of

  6. Dismantling of alpha contaminated obsolete installations and glove boxes on the IRMM site in Geel (Belgium)

    SciTech Connect (OSTI)

    Cretskens, Pieter; Lenie, Koen [Tecnubel NV, Gravenstraat 77, B-2480 Dessel (Belgium); Melis, Gustaaf [IRMM JRC, Retieseweg 111, B-2440 Geel (Belgium)

    2007-07-01T23:59:59.000Z

    At the Institute for Reference Materials and Measurements (European commission, Joint Research Centre, IRMM) a dismantling campaign of obsolete installations and glove boxes has been carried out in 2005. There were various reasons for their removal. Some large installations did not meet modern safety standards, other installations were worn out and expected to cause a radioactive contamination risk in the future. The main goal was to create as less waste as possible by extensive contamination checks and by decontamination if necessary. For the glove boxes, decontamination was not possible. A controlled area was set up around the installation to be dismantled in order to prevent spreading of contamination from dust and dirt. This was only possible for the 'minor' contaminated installations. The dismantling campaign of the glove boxes was carried out by using tents of two types depending the contamination inside the glove boxes. The most common glove boxes were dismantled in a tent constructed with hard surfaced polycarbonate plates (ventilated cell). For glove boxes with higher contamination, the same principle was used but with a second 'glove box tent' inside (ventilated glove tent). The purpose of this project was to learn from the experience of this campaign which gave the ability to make estimates of future radioactive waste or classic waste that could be expected from dismantled installations. (authors)

  7. Certification for Small Wind Turbine Installers: What's the Hang Up?; Preprint

    SciTech Connect (OSTI)

    Oteri, F.; Sinclair, K.

    2012-03-01T23:59:59.000Z

    Several programs have been implemented to support the advancement of a professional, mature small wind industry and to ensure that this industry moves forward in a sustainable direction. The development of a standard for small wind turbine systems and the creation of the Small Wind Certification Council support small wind technology that is reliable and safe. Consumers and incentive programs will ultimately rely on certification to differentiate among systems sold in the U.S. market. Certification of small wind installers is yet another component deemed necessary for this industry to expand. The National Renewable Energy Laboratory, under the guidance and funding support of the U.S. Department of Energy, supported the development of small wind system installer certification provided via the North American Board of Certified Energy Practitioners. However, the small wind community is not supportive of the installer certification. There are currently only nine certified installers in the U.S. pool. This paper provides an overview of the installer certification program and why more small wind turbine installers are not pursuing this certification.

  8. Climate Change Action Plan Report

    E-Print Network [OSTI]

    Hansen, Andrew J.

    Climate Change Action Plan Report Intermountain Region 2013 National Park Service Resource Stewardship and Science Landscape Conservation and Climate Change Division #12;About this Report Each National Park Service is responding to the challenge of climate change; and (2) raise awareness among NPS

  9. Unparticle actions and gauge invariance

    SciTech Connect (OSTI)

    Ilderton, Anton [School of Mathematics, Trinity College, Dublin 2 (Ireland)

    2009-01-15T23:59:59.000Z

    We show that the requirement of gauge invariance is not enough to fix the form of interactions between unparticles and gauge fields, thus revealing a wide new class of gauged unparticle actions. Our approach also allows us to construct operators which create gauge invariant colored unparticles. We discuss both their perturbative and nonperturbative properties.

  10. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 543: LIQUID DISPOSAL UNITS, NEVADA TEST SITE, NEVADA

    SciTech Connect (OSTI)

    NONE

    2006-09-01T23:59:59.000Z

    The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved Corrective Action Decision Document.

  11. Action

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTubahq.na.gov Office of the Administrator NNSA POLICY LETTER

  12. Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010

    E-Print Network [OSTI]

    Darghouth, Naim

    2012-01-01T23:59:59.000Z

    The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

  13. Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010

    E-Print Network [OSTI]

    Darghouth, Naim

    2012-01-01T23:59:59.000Z

    number of systems and installed capacity; the sample size3). In terms of installed capacity, however, the sample iswith 47% of the total installed capacity in the data sample

  14. Tracking the Sun VI: An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2012

    E-Print Network [OSTI]

    Barbose, Galen

    2014-01-01T23:59:59.000Z

    Laboratory. Tracking the Sun VI: The Installed Price ofRange ?10 kW Tracking the Sun VI: The Installed Price ofRange ?10 kW Tracking the Sun VI: The Installed Price of

  15. Tracking the Sun V: An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2011

    E-Print Network [OSTI]

    Barbose, Galen

    2014-01-01T23:59:59.000Z

    Council, Inc. Tracking the Sun V: The Installed Price ofapplications). Tracking the Sun V: The Installed Price ofEnergy Agency. Tracking the Sun V: The Installed Price of

  16. Corrective Action Investigation Plan for Corrective Action Unit 409: Other Waste Sites, Tonopah Test Range, Nevada (Rev. 0)

    SciTech Connect (OSTI)

    DOE/NV

    2000-10-05T23:59:59.000Z

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 409 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 409 consists of three Corrective Action Sites (CASs): TA-53-001-TAB2, Septic Sludge Disposal Pit No.1; TA-53-002-TAB2, Septic Sludge Disposal Pit No.2; and RG-24-001-RGCR, Battery Dump Site. The Septic Sludge Disposal Pits are located near Bunker Two, close to Area 3, on the Tonopah Test Range. The Battery Dump Site is located at the abandoned Cactus Repeater Station on Cactus Peak. The Cactus Repeater Station was a remote, battery-powered, signal repeater station. The two Septic Sludge Disposal Pits were suspected to be used through the late 1980s as disposal sites for sludge from septic tanks located in Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern are the same for the disposal pits and include: volatile organic compounds (VOCs), semivolatile organic compounds, total petroleum hydrocarbons (TPHs) as gasoline- and diesel-range organics, polychlorinated biphenyls, Resource Conservation and Recovery Act metals, and radionuclides (including plutonium and depleted uranium). The Battery Dump Site consists of discarded lead-acid batteries and associated construction debris, placing the site in a Housekeeping Category and, consequently, no contaminants are expected to be encountered during the cleanup process. The corrective action the at this CAU will include collection of discarded batteries and construction debris at the Battery Dump Site for proper disposal and recycling, along with photographic documentation as the process progresses. The corrective action for the remaining CASs involves the collection of background radiological data through borings drilled at undisturbed locations near the area of the disposal pits; field screening samples for radiological constituents; analysis for geotechnical/hydrologic parameters of samples beneath the disposal pits; and bioassessment samples, if VOC or TPH contamination concentrations exceed field-screening levels. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  17. Industry's Role: Action or Reaction

    E-Print Network [OSTI]

    Aspenson, R. L.

    1980-01-01T23:59:59.000Z

    We in business have a responsibility to voice our concerns, share our technical knowledge and contribute to effective energy legislation. And we also must get involved in the rule making proceedings of the regulatory process. I admit...

  18. Well Completion Report for Corrective Action Unit 443 Central Nevada Test Area Nye County, Nevada

    SciTech Connect (OSTI)

    None

    2009-12-01T23:59:59.000Z

    The drilling program described in this report is part of a new corrective action strategy for Corrective Action Unit (CAU) 443 at the Central Nevada Test Area (CNTA). The drilling program included drilling two boreholes, geophysical well logging, construction of two monitoring/validation (MV) wells with piezometers (MV-4 and MV-5), development of monitor wells and piezometers, recompletion of two existing wells (HTH-1 and UC-1-P-1S), removal of pumps from existing wells (MV-1, MV-2, and MV-3), redevelopment of piezometers associated with existing wells (MV-1, MV-2, and MV-3), and installation of submersible pumps. The new corrective action strategy includes initiating a new 5-year proof-of-concept monitoring period to validate the compliance boundary at CNTA (DOE 2007). The new 5-year proof-of-concept monitoring period begins upon completion of the new monitor wells and collection of samples for laboratory analysis. The new strategy is described in the Corrective Action Decision Document/Corrective Action Plan addendum (DOE 2008a) that the Nevada Division of Environmental Protection approved (NDEP 2008).

  19. WOODS FOR LEARNING ACTION PLAN 2010-2013 Objective National Indicators Specific actions

    E-Print Network [OSTI]

    WOODS FOR LEARNING ACTION PLAN 2010-2013 Objective National Indicators Specific actions Lead positive inspection reports Develop Forest Kindergarten with nurseries in both private and state sectors

  20. Action Sheet 36 Final Report

    SciTech Connect (OSTI)

    Kips, R E; Kristo, M J; Hutcheon, I D

    2012-02-24T23:59:59.000Z

    Pursuant to the Arrangement between the European Commission DG Joint Research Centre (EC-JRC) and the Department of Energy (DOE) to continue cooperation on research, development, testing, and evaluation of technology, equipment, and procedures in order to improve nuclear material control, accountancy, verification, physical protection, and advanced containment and surveillance technologies for international safeguards, dated 1 September 2008, the IRMM and LLNL established cooperation in a program on the Study of Chemical Changes in Uranium Oxyfluoride Particles under IRMM-LLNL Action Sheet 36. The work under this action sheet had 2 objectives: (1) Achieve a better understanding of the loss of fluorine in UO{sub 2}F{sub 2} particles after exposure to certain environmental conditions; and (2) Provide feedback to the EC-JRC on sample reproducibility and characteristics.

  1. Neighborhood Progress Through Organized Action.

    E-Print Network [OSTI]

    Newman, Eula; Cox, Bonnie; Martin, E. C.

    1955-01-01T23:59:59.000Z

    [Blank Page in Original Bulletin] ~ei~ h borhood Progress Through Organized Action E. C. MARTIN, Administrative Assistant BONNIE COX, Organization Specialist MRS. EULA NEWMAN, Specialist in Home Management TEXAS A. & M. COLLEGE SYSTEM "The... coord: lent r peo plt 1. mmunity organization is successful when all families erested groups participate. Such an organization may inate interest in the community and provide an excel- neans for channeling most programs. The interest...

  2. Fiscal year 1995 well installation program summary Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1995 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (including activities that were performed in late FY 1994, but not included in the FY 1994 Well Installation Program Summary Report). Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Three groundwater monitoring wells and two gas monitoring probes were installed during the FY 1995 drilling program. One of the groundwater monitoring wells was installed at Landfill VI, the other two in the Boneyard/Burnyard area. All of the groundwater monitoring wells were constructed with stainless steel screens and casings. The two gas monitoring probes were installed at the Centralized Sanitary Landfill II and were of polyvinyl chloride (PVC) screened construction. Eleven well rehabilitation/redevelopment efforts were undertaken during FY 1995 at the Y-12 Plant. All new monitoring wells and wells targeted for redevelopment were developed by either a 2.0-in. diameter swab rig or by hand bailing until nonspecific parameters (pH and specific conductance) attained steady-state levels. Turbidity levels were lowered, if required, to the extent practicable by continued development beyond a steady-state level of pH and conductance.

  3. Employment Counseling Action Plan Today's Date

    E-Print Network [OSTI]

    Myers, Lawrence C.

    Employment Counseling Action Plan Today's Date: Action Item: Due Date: Resources: Progress: Prepare or revise resume Prepare sample cover letters Register with several staffing agencies Seek out employment opportunities Practice interviewing techniques Review internal and external job opportunities Contact employers

  4. Emergence and perceptual guidance of prehensile action 

    E-Print Network [OSTI]

    Smith, Joanne

    2009-01-01T23:59:59.000Z

    Successful coordination of prehensile action depends upon the selection and control of appropriate reach and grasp movements. This thesis explores how prehensile actions are shaped and regulated by perceptual information. ...

  5. 5 Putting Science into Action on Forest

    E-Print Network [OSTI]

    5 Putting Science into Action on Forest Service Lands William M. Block u.s. Forest Service, Rocky into Action on Forest Service Lands t':: Research and Development, National Forest Systems, State and Private Forestry, International Programs

  6. S. Boyd EE102 Integral action

    E-Print Network [OSTI]

    response, or even instability (more on choice of ki later) Integral action 14­11 #12;closed-loop step responses of heater example, with C(s) = 1 + ki s , ki = 0 (proportional control; no integral action), ki

  7. The Impact of City-level Permitting Processes on Residential Photovoltaic Installation Prices and Development Times: An Empirical Analysis of Solar Systems in California Cities

    E-Print Network [OSTI]

    Wiser, Ryan

    2014-01-01T23:59:59.000Z

    and Utility-Scale Photovoltaic System Prices in the UnitedResidential Photovoltaic Installation Prices and DevelopmentResidential Photovoltaic Installation Prices and Development

  8. Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010

    E-Print Network [OSTI]

    Darghouth, Naim

    2012-01-01T23:59:59.000Z

    October 2010. The installed cost data presented within thatinfrastructure. Preliminary cost data for the first half ofmissing installed cost data (1,030 systems) or system size

  9. Iowa state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    None

    1981-02-09T23:59:59.000Z

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  10. California state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    none,

    1981-02-09T23:59:59.000Z

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  11. Pennsylvania state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    none,

    1980-12-31T23:59:59.000Z

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  12. Massachusetts state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    None

    1981-02-09T23:59:59.000Z

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  13. Current activities handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    none,

    1981-02-27T23:59:59.000Z

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the activities each of the thirteen state legislatures potentially affected by the Formerly Utilized Sites Remedial Action Program. It contains a description of the state legislative procedural rules and a schedule of each legislative session; a summary of pending relevant legislation; the name and telephone number of legislative and state agency contacts; and the full text of all bills identified.

  14. Studies involving low protein broiler diets

    E-Print Network [OSTI]

    Parkin, David Palmer

    1971-01-01T23:59:59.000Z

    STUDIES INVOLVING L(% PROTEIN BROILER DIETS A Thesis by David Palmer Parkin Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE May 1971 Major Subject...: Poultry Science STUDIES INVOLVING LS& PROTEIN BROILER DIETS A Thesis by David Palmer Parkin Approved as to style and content by: (Chairman of Commit e) ead of. Departmen Me er) (Member) (Memb ) May 1971 ABSTRACT Studies Involving Low Protein...

  15. AFFIRMATIVE ACTION PLAN FOR VETERANS AND

    E-Print Network [OSTI]

    Oliver, Douglas L.

    creates a private right of action on behalf of any individual or group against the Health Center. #12AFFIRMATIVE ACTION PLAN FOR VETERANS AND INDIVIDUALS WITH DISABILITIES University of Connecticut Health Center UCHC Farmington, CT July 1, 2008 - June 30, 2009 #12;AFFIRMATIVE ACTION PLAN FOR VETERANS

  16. The Leadership and Involvement Record Sponsored by the Center for Leadership and Involvement

    E-Print Network [OSTI]

    Sheridan, Jennifer

    The Leadership and Involvement Record Sponsored by the Center for Leadership and Involvement The Leadership and Involvement Record is an official document from the University of Wisconsin recording the leadership roles, student org involvement, or group membership students have had on campus. The record

  17. Maximizing the Value of Photovoltaic Installations on Schools in California: Choosing the Best Electricity Rates

    SciTech Connect (OSTI)

    Ong, S.; Denholm, P.

    2011-07-01T23:59:59.000Z

    Schools in California often have a choice between multiple electricity rate options. For schools with photovoltaic (PV) installations, choosing the right rate is essential to maximize the value of PV generation. The rate option that minimizes a school?s electricity expenses often does not remain the most economical choice after the school installs a PV system. The complex interaction between PV generation, building load, and rate structure makes determining the best rate a challenging task. This report evaluates 22 rate structures across three of California?s largest electric utilities--Pacific Gas and Electric Co. (PG&E), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E)--in order to identify common rate structure attributes that are favorable to PV installations.

  18. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    SciTech Connect (OSTI)

    Jack Q. Richardson

    2012-06-28T23:59:59.000Z

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  19. Calendar years 1989 and 1990 monitoring well installation program Y-12 plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1991-10-01T23:59:59.000Z

    This report documents the well-construction activities at the Y-12 Plant in Oak Ridge, Tennessee during 1989 and 1990. The well- construction program consisted of installing seventy-five monitoring wells. Geologists from ERCE (formally the Engineering, Design and Geosciences Group) and Martin Marietta Energy Systems (Energy Systems), supervised and documented well-construction activities and monitored for health and safety concerns. Sixty-seven monitoring wells were installed under the supervision of an ERCE geologist from March 1989 to September 1990. Beginning in September 1990, Energy Systems supervised drilling activities for eight monitoring wells, the last of which was completed in December 1990. 9 refs., 3 figs., 2 tabs.

  20. Installing and Running AIM 2.3.1 in a Clustered Server Production Environment

    SciTech Connect (OSTI)

    Walker, J.H.

    2003-09-11T23:59:59.000Z

    High availability and redundancy were required for a 24/7 technical baseline at a nuclear production facility. Process engineering, operations, and maintenance all had to connect to the AIM workflow and data management system at the plant. 24-hour availability and 100 percent data integrity were requirements. AIM 2.3.1 satisfied these needs by running in a clustered environment, using shared RAID 5 data storage installed with Oracle Fail Safe on clustered WinNT 4.0 Servers. Order of installation was critical for successful operation. The system has been running in production for 12 months with minimal downtime, and zero loss of data.

  1. Electrical installations in oil shale mines. Open file report 21 Sep 81-13 Aug 83

    SciTech Connect (OSTI)

    Gillenwater, B.B.; Kline, R.J.; Paas, N.

    1983-08-01T23:59:59.000Z

    This report presents recommended guidelines and regulatory changes applicable to electrical installations in underground oil shale mines. These recommendations are based on information gathered from oil shale operators, government agencies, and other knowledgeable sources familiar with existing plans for mining systems and electrical installations, and on present understanding of the problems and hazards associated with oil shale mining. Additional discussions of specific electrical problems related to oil shale mining include ground fault current levels, permissible electric wheel motors, permissible batteries and electric starting systems, intrinsically safe instrumentation, and applicability of existing test standards.

  2. The Effect of SEC Enforcement Actions and Class Action Lawsuits on Peer Jared Jennings

    E-Print Network [OSTI]

    Lin, Xiaodong

    environment in the U.S. is the prevalence of private class action lawsuits. In this paper, we investigateThe Effect of SEC Enforcement Actions and Class Action Lawsuits on Peer Firms Jared Jennings the SEC to deter potential miscreants via its enforcement actions against firms that indulge in fraudulent

  3. Guidance Regarding Actions That May Proceed During the NEPA Process...

    Energy Savers [EERE]

    gives examples of the types of actions that may proceed as interim actions, describes case studies, and outlines the steps in the EIS process for interim actions. Guidance...

  4. A New Action for Heavy Lattice Fermions

    E-Print Network [OSTI]

    Paul B. Mackenzie

    1992-12-14T23:59:59.000Z

    I describe a unified formalism for lattice fermions, in which the relativistic action of Wilson and the nonrelativistic and static actions appear as special cases. It is valid at all values of $m_q a$, including $m_q a \\approx 1$. In the limit $m_q a \\ll 1 $, the formulation reduces to the light quark action of Wilson. In the limit $m_q a \\gg 1 $, the formulation reduces to the nonrelativistic action of Thacker and Lepage, and to the static action of Eichten.

  5. POST-REMEDIAL ACTION REPORT

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTuba City, Arizona,Site Operations Guide Doc. No.GS05:orPOST-REMEDIAL ACTION

  6. Graphic Designer Student Involvement and Leadership

    E-Print Network [OSTI]

    Subramanian, Venkat

    Graphic Designer Student Involvement and Leadership Position Overview The Graphic Designer standards of the Student Involvement and Leadership brand guardrails · Complete other duties as assigned-Design, and Illustrator · Must have experience creating print and web graphics, flyers, and other promotional materials

  7. Hopper Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) EnvironmentalGyroSolé(tm) HarmonicbetandEnergy 2010 A selectionFile Storage

  8. Measure Guideline: Installing Rigid Foam Insulation on the Interior of Existing Brick Walls

    SciTech Connect (OSTI)

    Natarajan, H.; Klocke, S.; Puttagunta, S.

    2012-06-01T23:59:59.000Z

    This measure guideline provides information on an effective method to insulate the interior of existing brick masonry walls with extruded polystyrene (XPS) insulation board. The guide outlines step-by-step design and installation procedures while explaining the benefits and tradeoffs where applicable. The authors intend that this document be useful to a varied audience that includes builders, remodelers, contractors and homeowners.

  9. Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools

    SciTech Connect (OSTI)

    Coughlin, J.; Kandt, A.

    2011-10-01T23:59:59.000Z

    This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts. Solar energy systems installed on public schools have a number of benefits that include utility bill savings, reductions in greenhouse gas emissions (GHGs) and other toxic air contaminants, job creation, demonstrating environmental leadership, and creating learning opportunities for students. In the 2011 economic environment, the ability to generate general-fund savings as a result of reducing utility bills has become a primary motivator for school districts trying to cut costs. To achieve meaningful savings, the size of the photovoltaic (PV) systems installed (both individually on any one school and collectively across a district) becomes much more important; larger systems are required to have a material impact on savings. Larger PV systems require a significant financial commitment and financing therefore becomes a critical element in the transaction. In simple terms, school districts can use two primary types of ownership models to obtain solar installations and cost savings across a school district. The PV installations can be financed and owned directly by the districts themselves. Alternatively, there are financing structures whereby another entity, such as a solar developer or its investors, actually own and operate the PV systems on behalf of the school district. This is commonly referred to as the 'third-party ownership model.' Both methods have advantages and disadvantages that should be weighed carefully.

  10. Computer Lab Software Installation Policy for the Metropolitan Instructional Support Laboratory

    E-Print Network [OSTI]

    Computer Lab Software Installation Policy for the Metropolitan Instructional Support Laboratory Laboratory (MISL) provides computer lab space for faculty, staff and student use as individuals or in classes on lab computers. This policy applies to both stationary and portable lab computers. Policy: Scenario 1

  11. “What Efficiency Projects are Being Installed in the Pulp and Paper Industry”

    E-Print Network [OSTI]

    Nicol, J.

    2008-01-01T23:59:59.000Z

    The Wisconsin Focus on Energy program has seven years of experience on the actual projects that are being installed in the Pulp and Paper industry. The program has a broad perspective on the types and trends of investments in energy efficiency...

  12. 1.5 MW turbine installation at NREL's NWTC on Aug. 21

    ScienceCinema (OSTI)

    None

    2013-05-29T23:59:59.000Z

    Generating 20 percent of the nation's electricity from clean wind resources will require more and bigger wind turbines. NREL is installing two large wind turbines at the National Wind Technology Center to examine some of the industry's largest machines and address issues to expand wind energy on a commercial scale.

  13. Design Considerations, Installation and Operation of the Two-Stage Parallel Flow Absorption Chiller

    E-Print Network [OSTI]

    Hufford, P. E.

    1984-01-01T23:59:59.000Z

    combustion engines, or process flow to provide the elergy to the first stage generator. There are a nmber of installations currently opera- ting in South,zrn California where the exhaust from gas turbines is being taken directly into the two- stage...

  14. THE LOW-TEMPERATURE THRESHOLD FOR PINK SALMON EGGS IN RELATION TO A PROPOSED HYDROELECTRIC INSTALLATION

    E-Print Network [OSTI]

    Alaska would alter the seasonal pattern of stream temperatures and pose a threat to the natural (now the Alaska Power Administration) started feasibil- ity studies on a hydroelectric installation of the water from Grace Creek through a hydroelectric plant and back into Grace Creek about 1.2 km from tide

  15. Wireless sensor networks for off-shore oil and gas installations

    E-Print Network [OSTI]

    Gjessing, Stein

    1 Wireless sensor networks for off-shore oil and gas installations Martin Dalbro, Erik Eikeland ­ Underwater development and production of oil and gas needs networked sensors and actuators to monitor the production process, to either prevent or detect oil and gas leakage or to enhance the production flow

  16. Structural evaluation of mixer pump installed in Tank 241-AN-107 for caustic addition project

    SciTech Connect (OSTI)

    Leshikar, G.A.

    1995-06-16T23:59:59.000Z

    This report documents the structural analysis and evaluation of a mixer pump and caustic addition system to be used in Tank 107-AN. This pump will be installed in the central pump pit of this double- shell tank for the purpose of bringing the hydroxide ion concentration into compliance with Tank Farm operating specifications.

  17. Training Community College faculty in the techniques and skills required for Solar Energy System installation

    SciTech Connect (OSTI)

    Leo, R.J.

    1980-05-01T23:59:59.000Z

    A project to train a specified number of community college, vocational/technical faculty in the techniques and skills required to install solar energy systems is described. The planning that led to the contract, the development and conduct of the training workshops, and the outcomes are detailed. An overall evaluation of the project and recommendations for the future are included. (MHR)

  18. Volume XVIII, No. 5 A publication of the U.S. Army Installation Management Agency

    E-Print Network [OSTI]

    US Army Corps of Engineers

    : Corporate Visions, Inc. Washington, DC On the cover: A worker installs photovoltaic solar panels on Bldg 20-21 Fort McCoy work force asked to reduce energy use, costs by Rob Schuette 22-23 Solar panels help. Chvala Jr., Daryl Brown and Jim Dirks 26-27 Ground-coupled heat pumps save energy, money at Fort Knox

  19. Solar heating and cooling of residential buildings: sizing, installation and operation of systems. 1980 edition

    SciTech Connect (OSTI)

    None

    1980-09-01T23:59:59.000Z

    This manual was prepared as a text for a training course on solar heating and cooling of residential buildings. The course and text are directed toward sizing, installation, operation, and maintenance of solar systems for space heating and hot water supply, and solar cooling is treated only briefly. (MHR)

  20. Potential for substitution of geothermal energy at domestic defense installations and White Sands Missile Range

    SciTech Connect (OSTI)

    Bakewell, C.A.; Renner, J.L.

    1982-01-01T23:59:59.000Z

    Geothermal resources that might provide substitute energy at any of 76 defense installations are identified and evaluated. The geologic characteristics and related economics of potential geothermal resources located at or near the 76 installations were estimated. The geologic assessment identified 18 installations with possible geothermal resources and 4 Atlantic Coastal Plain resource configurations that represented the alternatives available to East Coast bases. These 18 locations and 4 resource configurations, together with 2 possible resources at the White Sands Missile Range and a potential resource at Kings Bay, Georgia, were examined to determine the relative economics of substituting potential geothermal energy for part or all of the existing oil, gas, and electrical energy usage. Four of the military installations - Mountain Home, Norton, Hawthorne, and Sierra - appear to be co-located with possible geothermal resources which, if present, might provide substitute energy at or below current market prices for oil. Six additional locations - Ellsworth, Luke, Williams, Bliss, Fallon, and Twentynine Palms - could become economically attractive under certain conditions. No geothermal resource was found to be economically competitive with natural gas at current controlled prices. Generation of electric power at the locations studied is estimated to be uneconomic at present.

  1. Compact passive wireless reinforced concrete corrosion initiation sensor that can be installed in existing steel

    E-Print Network [OSTI]

    Boyer, Edmond

    with a resolution of less than 10 mV. The sensor is 25 mm in diameter and is intended to be installed by drilling of reinforcement steel is Cl- ingression from the de-icing salts used extensively to clear snow and ice in winter

  2. Financing Solar Installations with New Markets Tax Credits: Denver, Colorado (Fact Sheet)

    SciTech Connect (OSTI)

    Coughlin, J.

    2010-09-01T23:59:59.000Z

    Fact sheet provides a brief overview of New Markets Tax Credits (NMTCs), a third-party financing incentive for solar installations in the public sector. NMTCs are intended to encourage economic activity in low-income and disadvantaged neighborhoods. The use of NMTCs in an innovative solar project transaction by the City of Denver, Colorado, is highlighted.

  3. Volume XVI, No. 5 A publication of the U.S. Army Installation Management Agency

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Sain 12 Energy audit at Army lab shows opportunities to conserve by David Underwood 13 FY 2004 Annual/October 2004 U.S. Army Installation Management Agency In this issue: Energy Management and Water Conservation .................................................................................................................................................................................... 4 2004 Energy and Water Management awards by David Purcell 5 USMA wins award for energy efficiency 6

  4. Hawaii Natural Energy Institute installs PV systems at public schools Pacific Business News

    E-Print Network [OSTI]

    the performance of traditional and emerging PV materials and inverter technologies," Institute Director Richard of the inverters, which convert direct current or DC power generated by the PV panels into alternating currentHawaii Natural Energy Institute installs PV systems at public schools Pacific Business News

  5. inverters, offering less weight, higher efficiency, and lower-cost installations.

    E-Print Network [OSTI]

    Johnson, Eric E.

    inverters, offering less weight, higher efficiency, and lower- cost installations. The electrical. These locking connectors will also soon appear on most, if not all, PV modules--although they are only required when the PV array wiring is operating above 30 volts and is readily accessible. Another 2008 NEC

  6. Transportation Services Fueling Operation Transportation Services has installed a software system that will facilitate fueling of

    E-Print Network [OSTI]

    Transportation Services Fueling Operation Transportation Services has installed a software system into this system. All University vehicles that wish to fuel at UH M noa Transportation Services will be required the application below and submit your application to Transportation Services before attempting to fuel your

  7. EIFAC 2006: DAMS, WEIRS AND FISH Long-term effects of hydropower installations

    E-Print Network [OSTI]

    McCarthy, T.K.

    EIFAC 2006: DAMS, WEIRS AND FISH Long-term effects of hydropower installations and associated river on stocking lakes with elvers and fingerling eels. These were trapped at the hydropower facilities.) stocks is a matter of great concern and Guest editors: R. L. Welcomme & G. Marmulla Hydropower, Flood

  8. SONY GXB5005 GPS RECEIVER DATA Without shield can Installed With shield can in place

    E-Print Network [OSTI]

    Berns, Hans-Gerd

    SONY GXB5005 GPS RECEIVER DATA Without shield can Installed With shield can in place (for illustrative purposes only) The Sony GXB5005 GPS receiver is a miniature 12 channel GPS module with support for WAAS/EGNOS augmented positioning. The receiver is based on Sony's CXD2951 single-chip GPS receiver IC

  9. BSR/CSA C448-201x, Design and Installation of Earth Energy Bi

    E-Print Network [OSTI]

    -loop earth energy heat pump systems Annex B Site survey worksheet Annex C Method for determining sizing · CM Engineering · HRAI · City of Calgary · Geo-Flo Products · Heat-Line Corporation · Government for Commercial and Institutional Buildings (ICI) C448.1 Design and Installation for Residential / Small Buildings

  10. Volume XIX, No. 6 A publication of the U.S. Army Installation Management Command

    E-Print Network [OSTI]

    US Army Corps of Engineers

    27 Late-breaking news: facilities regulation is out 28 Water model helps installations address Energy is one of many the U.S. Army Corps of Engineers, Europe District handed over to the Georgian government Allen 9-12 Huntsville Center projects range from saving energy to designing state-of-the-art facilities

  11. Tentative criteria for the design and installation of electrical power systems subject to seismic hazard

    SciTech Connect (OSTI)

    Parise, G.; Ferranti, F. [Univ. of Rome La Sapienza (Italy). Electrical Engineering Dept.; Colozza, R.

    1995-12-31T23:59:59.000Z

    The paper discusses the need to study the criteria for the design and installation of electrical power systems in buildings subject to seismic hazard. Nowadays, all the recommended seismic requirements (according to: Uniform Building Code UBC, Structural Engineers Association of California SEAOC, National Earthquake Hazards Reduction Program NEHRP) do not specifically take into account the electrical or technological power systems. The paper analyzes the problems an earthquake can cause with regard to the functional reliability and continuity of supply of electrical power systems. Therefore, it proposes design and installation requirements, to be graduated according to building occupancy categories. Basically, the criteria relative to the installation of the electrical equipment are an appropriate extension of those general static ones for nonstructural components. Their consideration is essential for the settlement of the design criteria, which, as far as the configuration and the size of the electrical power system are concerned, aim at limiting the same installation problems. Other general design criteria, aimed as a guarantee for the supply continuity and system reliability, have a particular use in these appliances.

  12. AT&TU-verseVoice Self Installation U-verse TVAT&T

    E-Print Network [OSTI]

    Fisher, Kathleen

    options require the use of a battery backup-up unit which is supplied in the kit. Please refer to the battery backup-up information on our website for additional details. Please do not attempt installation box. · Go outside and find your phone box (usually a gray/tan/black box on the side of the house

  13. Pictorial Descriptions of Traffic Sensor Deployments in Honolulu RTMS installation to monitor the out-bound

    E-Print Network [OSTI]

    Prevedouros, Panos D.

    truth counts (bottom right). Two batteries in parallel for the RTMS and one for the SAS were housed and Transportation Laboratory. #12;2 ORADS portable laser sensor installed parallel to the travel lanes along out inside the generator housing. Also shown in the picture above are the memory units for the RTMS

  14. Benefits of Stochastic Scheduling for Power Systems with Significant Installed Wind Power

    E-Print Network [OSTI]

    Benefits of Stochastic Scheduling for Power Systems with Significant Installed Wind Power Aidan Abstract-- Wind energy on a power system alters the unit commitment and dispatch problem, as it adds generation, Power system eco- nomics, Power generation dispatch, Unit Commitment, Wind Forecasting. I

  15. A Reference-Frame for Installing the Student's Computer to Access a Virtual Medicine University

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    the setup - system and the reference-frame. Services concerning the management of the student' computer management (especially confidential issues), its installation and its testing have been enlightened. Those. De plus, ce référentiel est trčs utile pour un administrateur de site universitaire ou hospitalier

  16. EVALUATION OF A PROTOTYPE SOLAR AWNING A prototype solar awning has been designed and installed on

    E-Print Network [OSTI]

    Oregon, University of

    and installed on a University of Oregon campus building. The solar awning is composed of a light shelf across the university system. A kiosk in the hallway turns the system into a solar awning lab where Increase the competitiveness of the university system's renewable energy curriculum Increase the value

  17. Volume XIX, No. 5 A publication of the U.S. Army Installation Management Command

    E-Print Network [OSTI]

    US Army Corps of Engineers

    : A compact fluorescent light saves energy and money. U.S. Army photo September/October 2007 Vol. XIX, No. 5 ................................................................................................... 20 Energy and water campaign plan charts way forward, by Curt Wexel 20-21 Initiative 1 ­ Energy waste/October 2007 U.S. Army Installation Management Command In this issue: Energy and Water Conservation

  18. Affine and degenerate affine BMW algebras: Actions on tensor space

    E-Print Network [OSTI]

    Ram, Arun

    Affine and degenerate affine BMW algebras: Actions on tensor space Zajj Daugherty Department Actions of classical type tantalizers 8 2.1 The degenerate affine BMW algebra action . . . . . . . . . . . . . . . . . . . . . 13 2.2 The affine BMW algebra action . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 3

  19. Factors Involved in Search Dog Training

    E-Print Network [OSTI]

    Alexander, Michael B.

    2010-07-14T23:59:59.000Z

    involved in training competent search dogs. Obedience training methods, age training was initiated, previous handler canine training experience, and handler perception and emotional attachment to their search dog were examined through a sixty-six question...

  20. Lawrence Berkeley Laboratory Affirmative Action Program. Revised

    SciTech Connect (OSTI)

    NONE

    1995-06-01T23:59:59.000Z

    The Lawrence Berkeley Laboratory`s Affirmative Action Program (AAP) serves as a working document that describes current policies, practices, and results in the area of affirmative action. It represents the Laboratory`s framework for an affirmative approach to increasing the representation of people of color and women in segments of our work force where they have been underrepresented and taking action to increase the employment of persons with disabilities and special disabled and Vietnam era veterans. The AAP describes the hierarchy of responsibility for Laboratory affirmative action, the mechanisms that exist for full Laboratory participation in the AAP, the policies and procedures governing recruitment at all levels, the Laboratory`s plan for monitoring, reporting, and evaluating affirmative action progress, and a description of special affirmative action programs and plans the Laboratory has used and will use in its efforts to increase the representation and retention of groups historically underrepresented in our work force.

  1. Developed C++ Action and Data classes Model in text format

    E-Print Network [OSTI]

    Liske, Jochen

    (transition actions or entry/exit actions). ARCHITECTURE MODEL TRANSFORMATIONS MAINTENANCE An application entry/ ACTION1 STEP2 entry/ ACTION2 STEPn entry/ ACTIONn EVENT1 SKIP1EVENT2 EVENTn SKIP2 EVENTn+1SKIPn IDLE ITERATION entry/ ACTION1 CONDITION entry/ ACTION2 EVENT1 EVENT2COMPLETED NEXT IDLE STEP1 STEP2

  2. Problem Description:Problem Description: Installing traditional, wired, structural health monitoring netwInstalling traditional, wired, structural health monitoring networks has severeorks has severe physical, hardware, cost, and time limitations.physical

    E-Print Network [OSTI]

    Heaton, Thomas H.

    monitoring netwInstalling traditional, wired, structural health monitoring networks has severeorks has severeProblem Description:Problem Description: Installing traditional, wired, structural health network for assessing pre- and post-event structural state of health. · Rapid deployment for aftershock

  3. Missouri State information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    none,

    1980-12-31T23:59:59.000Z

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations.

  4. Safety-related operator actions: methodology for developing criteria

    SciTech Connect (OSTI)

    Kozinsky, E.J.; Gray, L.H.; Beare, A.N.; Barks, D.B.; Gomer, F.E.

    1984-03-01T23:59:59.000Z

    This report presents a methodology for developing criteria for design evaluation of safety-related actions by nuclear power plant reactor operators, and identifies a supporting data base. It is the eleventh and final NUREG/CR Report on the Safety-Related Operator Actions Program, conducted by Oak Ridge National Laboratory for the US Nuclear Regulatory Commission. The operator performance data were developed from training simulator experiments involving operator responses to simulated scenarios of plant disturbances; from field data on events with similar scenarios; and from task analytic data. A conceptual model to integrate the data was developed and a computer simulation of the model was run, using the SAINT modeling language. Proposed is a quantitative predictive model of operator performance, the Operator Personnel Performance Simulation (OPPS) Model, driven by task requirements, information presentation, and system dynamics. The model output, a probability distribution of predicted time to correctly complete safety-related operator actions, provides data for objective evaluation of quantitative design criteria.

  5. COMMUNITY INVOLVEMENT PLAN APRIL 15, 1999.

    SciTech Connect (OSTI)

    GEIGER,K.

    1999-04-15T23:59:59.000Z

    This Community Involvement Plan has been prepared by the Brookhaven National Laboratory's Community Involvement Office with the input of the community, Laboratory employees and representatives of the U.S. Department of Energy. The process to develop the plan began with the formation of a focus group consisting of representatives from: the community at large; special interest groups within the community; the business community; Laboratory retirees; senior and line management from the Laboratory; and the U.S. Department of Energy. The focus group reviewed an initial outline developed by the Office of Community involvement, held in-depth roundtable discussions of community involvement needs, and created a draft plan based on their discussions. A workshop was held to present the draft Community Involvement Plan to a wider audience for their input and insights on how Brookhaven should involve the community in decision making. This workshop was advertised in local newspapers and within the Laboratory. It was attended by community members, special interest group representatives, Laboratory employees and managers, U.S. Department of Energy-Brookhaven Group management, and members of the Laboratory's Community Advisory Council. The results of the workshop discussions are incorporated in this plan.

  6. CX-000132: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Block Grant Program. The proposed action would involve the purchase and installation of a solar panel system on the community washeteria, a public facility with rest rooms, showers...

  7. --No Title--

    Broader source: Energy.gov (indexed) [DOE]

    and pilot projects The proposed action would involve the purchase and installation of a solar thermal system to be focused on producing domestic hot water, functioning in...

  8. CX-000140: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Block Grant Program. The proposed action would involve the purchase and installation of a solar thermal system to be focused on producing domestic hot water, functioning in...

  9. Field Test and Performance Verification: Integrated Active Desiccant Rooftop Hybrid System Installed in a School - Final Report: Phase 4A

    SciTech Connect (OSTI)

    Fischer, J

    2005-12-21T23:59:59.000Z

    This report summarizes the results of a field verification pilot site investigation that involved the installation of a hybrid integrated active desiccant/vapor-compression rooftop heating, ventilation, and air-conditioning (HVAC) unit at an elementary school in the Atlanta Georgia area. For years, the school had experienced serious humidity and indoor air quality (IAQ) problems that had resulted in occupant complaints and microbial (mold) remediation. The outdoor air louvers of the original HVAC units had been closed in an attempt to improve humidity control within the space. The existing vapor compression variable air volume system was replaced by the integrated active desiccant rooftop (IADR) system that was described in detail in an Oak Ridge National Laboratory (ORNL) report published in 2004 (Fischer and Sand 2004). The IADR system and all space conditions have been monitored remotely for more than a year. The hybrid system was able to maintain both the space temperature and humidity as desired while delivering the outdoor air ventilation rate required by American Society of Heating, Refrigerating and Air-Conditioning Engineers Standard 62. The performance level of the IADR unit and the overall system energy efficiency was measured and found to be very high. A comprehensive IAQ investigation was completed by the Georgia Tech Research Institute before and after the system retrofit. Before-and-after data resulting from this investigation confirmed a significant improvement in IAQ, humidity control, and occupant comfort. These observations were reported by building occupants and are echoed in a letter to ORNL from the school district energy manager. The IADR system was easily retrofitted in place of the original rooftop system using a custom curb adapter. All work was completed in-house by the school's maintenance staff over one weekend. A subsequent cost analysis completed for the school district by the design engineer of record concluded that the IADR system being investigated was actually less expensive to install than other less-efficient options, most of which were unable to deliver the required ventilation while maintaining the desired space humidity levels.

  10. Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan

    SciTech Connect (OSTI)

    NONE

    1981-05-01T23:59:59.000Z

    The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

  11. Nuclear facility decommissioning and site remedial actions

    SciTech Connect (OSTI)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01T23:59:59.000Z

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  12. Categorical Exclusion Determination Form Proposed Action Title...

    Broader source: Energy.gov (indexed) [DOE]

    CountyState): TVN Systems, Inc. (Lawrence, KS); Vanderbilt University (Nashville, TN); University of Kansas (Lawrence, KS) Proposed Action Description: Funding will support...

  13. Categorical Exclusion Determination Form Proposed Action Title...

    Broader source: Energy.gov (indexed) [DOE]

    LocationCs) CCityCountyState): Bosch RTC (Palo Alto, CA); Cobasys, LLC (Orion, MI); University of California - San Diego (San Diego, CA) Proposed Action Description: Funding...

  14. Categorical Exclusion Determination Form Proposed Action Title...

    Broader source: Energy.gov (indexed) [DOE]

    Research Projects Agency - Energy LocationCs) CCityCountyState): Niskayuna, NY; Ann Arbor, MI; Dearborn, MI Proposed Action Description: Funding will support efforts to...

  15. Measure Guideline: Summary of Interior Ducts in New Construction, Including an Efficient, Affordable Method to Install Fur-Down Interior Ducts

    SciTech Connect (OSTI)

    Beal, D.; McIlvaine , J.; Fonorow, K.; Martin, E.

    2011-11-01T23:59:59.000Z

    This document illustrates guidelines for the efficient installation of interior duct systems in new housing, including the fur-up chase method, the fur-down chase method, and interior ducts positioned in sealed attics or sealed crawl spaces. This document illustrates guidelines for the efficient installation of interior duct systems in new housing. Interior ducts result from bringing the duct work inside a home's thermal and air barrier. Architects, designers, builders, and new home buyers should thoroughly investigate any opportunity for energy savings that is as easy to implement during construction, such as the opportunity to construct interior duct work. In addition to enhanced energy efficiency, interior ductwork results in other important advantages, such as improved indoor air quality, increased system durability and increased homeowner comfort. While the advantages of well-designed and constructed interior duct systems are recognized, the implementation of this approach has not gained a significant market acceptance. This guideline describes a variety of methods to create interior ducts including the fur-up chase method, the fur-down chase method, and interior ducts positioned in sealed attics or sealed crawl spaces. As communication of the intent of an interior duct system, and collaboration on its construction are paramount to success, this guideline details the critical design, planning, construction, inspection, and verification steps that must be taken. Involved in this process are individuals from the design team; sales/marketing team; and mechanical, insulation, plumbing, electrical, framing, drywall and solar contractors.

  16. INSTALLATION CERTIFICATE CF-6R-MECH-23-HERS Verification of High EER Equipment (Page 1 of 1)

    E-Print Network [OSTI]

    for construction (responsible person). · I certify that the installed features, materials, components to accept responsibility for construction, or an authorized representative of the person responsible of this Installation Certificate shall be posted, or made available with the building permit(s) issued for the building

  17. INSTALLATION CERTIFICATE CF-6R-MECH-28-HERS Low Leakage Air Handler Verification (Page 1 of 1)

    E-Print Network [OSTI]

    for construction (responsible person). · I certify that the installed features, materials, components to accept responsibility for construction, or an authorized representative of the person responsible of this Installation Certificate shall be posted, or made available with the building permit(s) issued for the building

  18. INSTALLATION CERTIFICATE CF-6R-MECH-02 Solar Domestic Hot Water Systems (SDHW) (Page 1 of 1)

    E-Print Network [OSTI]

    for construction (responsible person). · I certify that the installed features, materials, components to accept responsibility for construction, or an authorized representative of the person responsible, signed copy of this Installation Certificate shall be posted, or made available with the building permit

  19. Network-based Root of Trust for Installation Joshua Schiffman, Thomas Moyer, Trent Jaeger and Patrick McDaniel

    E-Print Network [OSTI]

    Yener, Aylin

    Department, Pennsylvania State University Administrators of large data centers often require network be automated for the administrator. The result is that secure network installation, even over an untrustedNetwork-based Root of Trust for Installation Joshua Schiffman, Thomas Moyer, Trent Jaeger

  20. Press-in piling: Ground vibration and noise during pile installation David White*, Tim Finlay**, Malcolm Bolton*** and Grant Bearss****

    E-Print Network [OSTI]

    Bolton, Malcolm

    of press-in piling makes use of hydraulic rams to provide the force necessary to jack pre-formed piles1 Press-in piling: Ground vibration and noise during pile installation David White*, Tim Finlay-suited to the urban environment. The press- in method offers an alternative technique of pile installation, which

  1. Environmental Activism as Collective Action Key words: Environmental activism, environmental behavior, collective action,

    E-Print Network [OSTI]

    Lubell, Mark

    Environmental Activism as Collective Action Key words: Environmental activism, environmental behavior, collective action, environmentalism, collective interest model. Mark Lubell Department The literature on environmental activism has failed to produce a model of individual decision- making explicitly

  2. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 300: SURFACE RELEASE AREAS NEVADA TEST SITE, NEVADA

    SciTech Connect (OSTI)

    NONE

    2006-07-01T23:59:59.000Z

    The purpose of this Corrective Action Plan (CAP) is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CAU 300 CADD.

  3. Engineering tasl plan for the development, fabrication and installation of rotary mode core sample truck bellows

    SciTech Connect (OSTI)

    BOGER, R.M.

    1999-06-24T23:59:59.000Z

    The Rotary Mode Core Sampling Trucks (RMSCTs) currently use a multi-sectioned bellows between the grapple box and the quill rod to compensate for drill head motion and to provide a path for purge gas. The current bellows, which is detailed on drawing H-2-690059, is expensive to procure, has a lengthy procurement cycle, and is prone to failure. Therefore, a task has been identified to design, fabricate, and install a replacement bellows. This Engineering Task Plan (ETP) is the management plan document for accomplishing the identified tasks. Any changes in scope of the ETP shall require formal direction by the Characterization Engineering manager. This document shall also be considered the work planning document for developmental control per Development Control Requirements (HNF 1999a). This Engineering Task Plan (ETP) is the management plan document for accomplishing the design, fabrication, and installation of a replacement bellows assembly for the Rotary Mode Core Sampling Trucks 3 and 4 (RMCST).

  4. Installation of the first Distributed Energy Storage System (DESS) at American Electric Power (AEP).

    SciTech Connect (OSTI)

    Nourai, Ali (American Electric Power Company, Columbus, OH)

    2007-06-01T23:59:59.000Z

    AEP studied the direct and indirect benefits, strengths, and weaknesses of distributed energy storage systems (DESS) and chose to transform its entire utility grid into a system that achieves optimal integration of both central and distributed energy assets. To that end, AEP installed the first NAS battery-based, energy storage system in North America. After one year of operation and testing, AEP has concluded that, although the initial costs of DESS are greater than conventional power solutions, the net benefits justify the AEP decision to create a grid of DESS with intelligent monitoring, communications, and control, in order to enable the utility grid of the future. This report details the site selection, construction, benefits and lessons learned of the first installation, at Chemical Station in North Charleston, WV.

  5. (Pulsed atmospheric fluidized-bed combustion). [Installation of the pulsed atmospheric fluidized-bed combustion components

    SciTech Connect (OSTI)

    Not Available

    1988-10-01T23:59:59.000Z

    This second Quarterly Technical Progress Report presents the results of work accomplished during the period July 25 through October 30, 1988. The overall objective of the program is the development of a pulsed atmospheric fluidized-bed combustion (PAFBC) technology to burn coal and to provide heat and steam to commercial, institutional, and small industrial applications at a reasonable price in environmentally acceptable manner. Progress during this period accelerated rapidly. The site for the installation of the PAFBC was completed. All of the system components, including the fabrication of the furnace, were also completed. Additional component testing and inspection was also completed. By the end of this period the AFBC was completely assembled and installed at the site adjacent to the MTCI facility and shakedown tests were initiated. 20 figs., 2 tabs.

  6. Biased insert for installing data transmission components in downhole drilling pipe

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Briscoe, Michael A. (Lehi, UT); Garner, Kory K. (Payson, UT); Wilde, Tyson J. (Spanish Fork, UT)

    2007-04-10T23:59:59.000Z

    An apparatus for installing data transmission hardware in downhole tools includes an insert insertable into the box end or pin end of drill tool, such as a section of drill pipe. The insert typically includes a mount portion and a slide portion. A data transmission element is mounted in the slide portion of the insert. A biasing element is installed between the mount portion and the slide portion and is configured to create a bias between the slide portion and the mount portion. This biasing element is configured to compensate for varying tolerances encountered in different types of downhole tools. In selected embodiments, the biasing element is an elastomeric material, a spring, compressed gas, or a combination thereof.

  7. Solar heating and hot water system installed at Shoney's Restaurant, North Little Rock, Arkansas. Final report

    SciTech Connect (OSTI)

    None

    1980-08-01T23:59:59.000Z

    The solar heating system is designed to supply a major portion of the space and water heating requirements for a newly built Shoney's Big Boy Restaurant which was installed with completion occurring in December 1979. The restaurant has a floor space of approximately 4,650 square feet and requires approximately 1500 gallons of hot water daily. The solar energy system consists of 1,428 square feet of Chamberlain flat plate liquid collector subsystem, and a 1500 gallon storage subsystem circulating hot water producing 321 x 10/sup 6/ Btu/yr (specified) building heating and hot water heating. Designer - Energy Solutions, Incorporated. Contractor - Stephens Brothers, Incorporated. This report includes extracts from site files, specification references for solar modifications to existing building heating and hot water systems, drawings installation, operation and maintenance instructions.

  8. Radiation Control Coatings Installed on Federal Buildings at Tyndall Air Force Base

    SciTech Connect (OSTI)

    Kaba, R.L.; Petrie, T.W.

    1999-03-16T23:59:59.000Z

    The technical objectives of this CRADA comprise technology deployment and energy conservation efforts with the radiation control coatings industry and the utility sector. The results of this collaboration include a high-level data reporting, analysis and management system to support the deployment efforts. The technical objectives include successfully install, commission, operate, maintain and document the performance of radiation control coatings on roofs at Tyndall AFB and the Buildings Technology Center at the Oak Ridge National Laboratory; determine the life cycle savings that can be achieved by using radiation control coatings on entire roofs at Tyndall AFB, based on documented installed cost and operating maintenance costs with and without the coatings; determine if any specific improvements are required in the coatings before they can be successfully deployed in the federal sector; determine the most effective way to facilitate the widespread and rapid deployment of radiation control coatings in the federal sector; and clearly define any barriers to deployment.

  9. Apparatus for installing condition-sensing means in subterranean earth formations

    DOE Patents [OSTI]

    Shuck, Lowell Z. (Morgantown, WV)

    1981-01-01T23:59:59.000Z

    The present invention is directed to an apparatus for installing strain gages or other sensors-transducers in wellbores penetrating subterranean earth formations. The subject apparatus comprises an assembly which is lowered into the wellbore, secured in place, and then actuated to sequentially clean the wellbore or casing surface at a selected location with suitable solvents, etchants and neutralizers, grind the surface to a relatively smooth finish, apply an adhesive to the surface, and attach the strain gages or the like to the adhesive-bearing surface. After installing the condition-sensing gages to the casing or earth formation the assembly is withdrawn from the wellbore leaving the sensing gages securely attached to the casing or the subterranean earth formation.

  10. Broad Overview of Energy Efficiency and Renewable Energy Opportunities for Department of Defense Installations

    SciTech Connect (OSTI)

    Anderson, E.; Antkowiak, M.; Butt, R.; Davis, J.; Dean, J.; Hillesheim, M.; Hotchkiss, E.; Hunsberger, R.; Kandt, A.; Lund, J.; Massey, K.; Robichaud, R.; Stafford, B.; Visser, C.

    2011-08-01T23:59:59.000Z

    The Strategic Environmental Research and Developmental Program (SERDP)/Environmental Security Technology Certification Program (ESTCP) is the Department of Defense?s (DOD) environmental science and technology program focusing on issues related to environment and energy for the military services. The SERDP/ESTCP Office requested that the National Renewable Energy Laboratory (NREL) provide technical assistance with strategic planning by evaluating the potential for several types of renewable energy technologies at DOD installations. NREL was tasked to provide technical expertise and strategic advice for the feasibility of geothermal resources, waste-to-energy technology, photovoltaics (PV), wind, microgrids, and building system technologies on military installations. This technical report is the deliverable for these tasks.

  11. An overview of the sustainability of solid waste management at military installations

    SciTech Connect (OSTI)

    Borglin, S.; Shore, J.; Worden, H.; Jain, R.

    2009-08-15T23:59:59.000Z

    Sustainable municipal solid waste management at military solutions necessitates a combined approach that includes waste reduction, alternative disposal techniques, and increased recycling. Military installations are unique because they often represent large employers in the region in which they are located, thereby making any practices they employ impact overall waste management strategies of the region. Solutions for waste sustainability will be dependent on operational directives and base location, availability of resources such as water and energy, and size of population. Presented in this paper are descriptions of available waste strategies that can be used to support sustainable waste management. Results presented indicate source reduction and recycling to be the most sustainable solutions. However, new waste-to-energy plants and composting have potential to improve on these well proven techniques and allow military installations to achieve sustainable waste management.

  12. Evaluation of Aqua-Ammonia Chiller Technologies and Field Site Installation

    SciTech Connect (OSTI)

    Zaltash, Abdolreza [ORNL

    2007-09-01T23:59:59.000Z

    The Naval Facilities Engineering Service Center (NFESC) has sponsored Oak Ridge National Laboratory (ORNL) to review, select, and evaluate advanced, gas-fired, 5-ton, aqua-ammonia, chiller technologies. The selection criteria was that units have COP values of 0.67 or better at Air-conditioning and Refrigeration Institute (ARI) 95 F outdoor rating conditions, an active refrigerant flow control, and a variable-speed condenser fan. These features are expected to allow these units to operate at higher ambient temperatures (up to the maximum operating temperature of 110 F) with minimal degradation in performance. ORNL evaluated three potential manufacturers of advanced, gas-fired, 5-ton, aqua-ammonia chillers-Robur, Ambian, and Cooling Technologies. Unfortunately, Robur did not meet the COP requirements and Cooling Technologies could not deliver a unit to be tested at the U.S. Department of Energy (DOE)-ORNL environmental chamber testing facility for thermally activated heat pumps. This eliminated these two technologies from further consideration, leaving only the Ambian chillers for evaluation. Two Ambian chillers were evaluated at the DOE-ORNL test facility. Overall these chillers operated well over a wide range of ambient conditions with minimal degradation in performance due to several control strategies used such as a variable speed condenser fan, a modulating burner, and active refrigerant flow control. These Ambian pre-commercial units were selected for installation and field testing at three federal facilities. NFESC worked with ORNL to assist with the site selection for installation and evaluation of these chillers. Two sites (ORNL and Naval Surface Warfare Center [NSWC] Corona) had a single chiller unit installed; and at one site (Naval Amphibious Base [NAB] Little Creek), two 5-ton chillers linked together were installed to provide 10 tons of cooling. A chiller link controller developed under this project was evaluated in the field test at Little Creek.

  13. Summary Article: IEA HPP Annex 36: Quality Installation / Quality Maintenance Sensitivity Studies

    SciTech Connect (OSTI)

    Hourahan, Mr. Glenn [Air Conditioning Contractors of America, Arlington, VA; Domanski, Dr. Piotr [National Institute of Standards and Technology (NIST), Gaithersburg, MD; Baxter, Van D [ORNL

    2015-01-01T23:59:59.000Z

    The outcome from this Annex activity clearly identifies that poorly designed, installed, and/or maintained heat pumps operate inefficiently and waste considerable energy compared to their as-designed potential. Additionally, it is clear that small faults for a given field-observed practice are significant, that some attribute deviations (in various equipment applications and geographical locations) have a larger impact than others, and that multiple faults or deviations have a cumulative impact on heat pump performance.

  14. Annual Radiological Environmental Monitoring Program Report for the Fort St. Vrain Independent Spent Fuel Storage Installation

    SciTech Connect (OSTI)

    Hall, Gregory Graham; Newkirk, Jay Ronald; Borst, Frederick Jon

    2002-02-01T23:59:59.000Z

    This report presents the results of the 2001 Radiological Environmental Monitoring Program conducted in accordance with 10 CFR 72.44 for the Fort St. Vrain Independent Spent Fuel Storage Installation. A description of the facility and the monitoring program is provided. The results of monitoring the predominant radiation exposure pathway, direct and scattered radiation exposure, indicate the facility operation has not contributed to any increase in the estimated maximum potential dose commitment to the general public.

  15. Development of a Web-based Emissions Reduction Calculator for Solar Thermal and Solar Photovoltaic Installations 

    E-Print Network [OSTI]

    Baltazar-Cervantes, J. C.; Gilman, D.; Haberl, J. S.; Culp, C.

    2005-01-01T23:59:59.000Z

    DEVELOPMENT OF A WEB-BASED EMISSIONS REDUCTION CALCULATOR FOR SOLAR THERMAL AND SOLAR PHOTOVOLTAIC INSTALLATIONS Juan-Carlos Baltazar Research Associate Jeff S. Haberl, Ph.D., P.E. Professor/Associate Director Don R. Gilman, P.E. Senior... the potential emission reductions due to the electricity savings from the application of some of the most common solar thermal and solar photovoltaic systems. The methodology to estimate the potential NOx emission reduction integrates legacy analysis tools...

  16. Installation of a Devonian Shale Reservoir Testing Facility and acquisition of reservoir property measurements

    SciTech Connect (OSTI)

    Locke, C.D.; Salamy, S.P.

    1991-09-01T23:59:59.000Z

    In October, a contract was awarded for the Installation of a Devonian Shale Reservoir Testing Facility and Acquisition of Reservoir Property measurements from wells in the Michigan, Illinois, and Appalachian Basins. Geologic and engineering data collected through this project will provide a better understanding of the mechanisms and conditions controlling shale gas production. This report summarizes the results obtained from the various testing procedures used at each wellsite and the activities conducted at the Reservoir Testing Facility.

  17. Installation of a Devonian Shale Reservoir Testing Facility and acquisition of reservoir property measurements. Final report

    SciTech Connect (OSTI)

    Locke, C.D.; Salamy, S.P.

    1991-09-01T23:59:59.000Z

    In October, a contract was awarded for the Installation of a Devonian Shale Reservoir Testing Facility and Acquisition of Reservoir Property measurements from wells in the Michigan, Illinois, and Appalachian Basins. Geologic and engineering data collected through this project will provide a better understanding of the mechanisms and conditions controlling shale gas production. This report summarizes the results obtained from the various testing procedures used at each wellsite and the activities conducted at the Reservoir Testing Facility.

  18. The 110 GHz ECH installation on DII-D: Status and initial experimental results

    SciTech Connect (OSTI)

    Lohr, J.; Callis, R.W.; O`Neill, R.C. [Univ. of Texas, Austin, TX (United States)] [and others

    1997-05-01T23:59:59.000Z

    Two 110 GHz gyrotrons with nominal output power of 1 MW each have been installed on the DIII-D tokamak. The gyrotrons, produced by Gycom and Communications and Power Industries, are connected to the tokamak by windowless evacuated transmission lines using circular corrugated waveguide carrying the HE{sub 11} mode. Initial experiments with the Gycom gyrotron showed good central heating efficiency at the second harmonic resonance with record central electron temperatures for DIII-D in excess of 10 keV achieved. The beam spot in the DIII-D vacuum vessel was well focused, with a diameter of approximately 8 cm, and it could be steered poloidally by a remotely adjustable mirror. The injection was at 19 deg off-perpendicular for current drive and the beams could be modulated for studies of energy transport and power deposition. The system will be described and the initial physics results will be presented. A third gyrotron, also at 110 GHz, will be installed later this year. Progress with this CPI tube will be discussed and future plans for the ECH installation and physics experiments using it will be presented.

  19. Safety basis for the 241-AN-107 mixer pump installation and caustic addition

    SciTech Connect (OSTI)

    Van Vleet, R.J. [Westinghouse Hanford Co., Richland, WA (United States)

    1994-10-05T23:59:59.000Z

    This safety Basis was prepared to determine whether or not the proposed activities of installing a 76 HP jet mixer pump and the addition of approximately 50,000 gallons of 19 M (50:50 wt %) aqueous caustic are within the safety envelope as described by Tank Farms (chapter six of WHC-SD-WM-ISB-001, Rev. 0). The safety basis covers the components, structures and systems for the caustic addition and mixer pump installation. These include: installation of the mixer pump and monitoring equipment; operation of the mixer pump, process monitoring equipment and caustic addition; the pump stand, caustic addition skid, the electrical skid, the video camera system and the two densitometers. Also covered is the removal and decontamination of the mixer pump and process monitoring system. Authority for this safety basis is WHC-IP-0842 (Waste Tank Administration). Section 15.9, Rev. 2 (Unreviewed Safety Questions) of WHC-IP-0842 requires that an evaluation be performed for all physical modifications.

  20. Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)

    SciTech Connect (OSTI)

    Goodrich, A. C.; Woodhouse, M.; James, T.

    2011-02-01T23:59:59.000Z

    EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PV system installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by project managers at leading U.S. installers. The cost models are constructed through a "bottoms-up" assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to an installer, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.

  1. Patent Issued Additional Office Actions Received

    E-Print Network [OSTI]

    Cui, Yan

    Patent Issued Additional Office Actions Received 3-12 mo. Respond to Office Action Patent attorney The patent examiner provides notification of which claims in the application have been rejected or accepted determines there are multiple inventions in 1 application. Patent Application Published 6 mo. Non

  2. CLIMATE ACTION PLAN NOVEMBER 10, 2009

    E-Print Network [OSTI]

    Suzuki, Masatsugu

    CLIMATE ACTION PLAN NOVEMBER 10, 2009 SANDY DEJOHN PHYSICAL FACILITIES DEPARTMENT #12;~ i ~ TABLE the American College and University Presidents Climate Commitment, I believe strongly in working to achieve its helped shape and develop the information contained in this Climate Action Plan: (Names listed

  3. A Brief Look At Affirmative Action

    E-Print Network [OSTI]

    Erickson, Nancy Jo

    2007-12-06T23:59:59.000Z

    .........................................................................................13 Limitations of This Study ..........................................................................................14 History of Affirmative Action ...................................................................................15 Two Sides... of pertinent information due to the closed nature of the system being studied and the limited amount of information on this specific topic by anthropologists and the anthropological community. 14 History of Affirmative Action In its tumultuous 46-year...

  4. Action Requested: THE UNIVERSITY OF MICHIGAN

    E-Print Network [OSTI]

    Kamat, Vineet R.

    Subject: Action Requested: THE UNIVERSITY OF MICHIGAN REGENTS COMMUNICATION ACTION REQUEST on the basis of being Michigan residents. Second, the proposed Guidelines significantly expand the ways an alternative test for establishing eligibility for in-state tuition based on attendance at Michigan high

  5. RCRA Corrective Action Plan. Interim report (Final)

    SciTech Connect (OSTI)

    Not Available

    1988-06-01T23:59:59.000Z

    The RCRA Corrective Action Plan (CAP) will assist in the development of Corrective Action Orders (Section 3008(h)) and corrective action requirements in permit applications and permits (Section 3004(u) (v)). The purpose of the CAP is to aid Regions and States in determining and directing the specific work the owner/operator or respondent must perform, as part of a complete corrective action program. The CAP should be used as a technical framework during the development of Corrective Action Orders and corrective action permit regulations. The CAP provides a framework for the development of a site-specific schedule of compliance to be included in a permit or a compliance schedule in a Corrective Action Order. It does so by laying out scopes of work for the three essential phases of a complete corrective action program. These three phases and their objectives are as follows: (1) RCRA Facility Investigation (RFI) - to evaluate thoroughly the nature and extent of the release of hazardous waste and hazardous constituents and to gather necessary data to support the Corrective Measure Study; (2) Corrective Measures Study (CMS) - to develop and evaluate a corrective measure alternative or alternatives and to recommend the final corrective measure or measures; and (3) Corrective Measures Implementation (CMI) - to design, construct, operate, maintain and monitor the performance of the corrective measure or measures selected.

  6. World Volume Action for Fractional Branes

    E-Print Network [OSTI]

    Merlatti, P

    2001-01-01T23:59:59.000Z

    We study the world volume action of fractional Dp-branes of type IIA string theory compactified on the orbifold T^4/Z_2. The geometric relation between these branes and wrapped branes is investigated using conformal techniques. In particular we examine in detail various scattering amplitudes and find that the leading low-energy interactions are consistent with the boundary action derived geometrically.

  7. World Volume Action for Fractional Branes

    E-Print Network [OSTI]

    P. Merlatti; G. Sabella

    2001-01-11T23:59:59.000Z

    We study the world volume action of fractional Dp-branes of type IIA string theory compactified on the orbifold T^4/Z_2. The geometric relation between these branes and wrapped branes is investigated using conformal techniques. In particular we examine in detail various scattering amplitudes and find that the leading low-energy interactions are consistent with the boundary action derived geometrically.

  8. Corrective Action Decision Document for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada

    SciTech Connect (OSTI)

    DOE /NV

    1999-05-26T23:59:59.000Z

    This Corrective Action Decision Document has been prepared for the Nevada Test Site's Area 23 Mercury Fire Training Pit (Corrective Action Unit 342) in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996). Corrective Action Unit 342 is comprised of Corrective Action Site 23-56-01. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended corrective action alternative for Corrective Action Unit 342. The scope of this document consists of the following: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of corrective action alternatives in relation to corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for the Corrective Action Unit.

  9. Environmental science and ecology involve studies

    E-Print Network [OSTI]

    Christensen, Dan

    Environmental science and ecology involve studies of the biosphere, hydro- sphere, and lithosphere in environmental science is conducted on spatial scales varying from a single algal cell to the Earth as a whole's environmental scientists require investigation by an interdisciplinary team, including members from several

  10. Increasing Public Involvement in Structural Biology

    E-Print Network [OSTI]

    Baker, David

    --often referred to as citizen science--provides a means of engaging people's skills, rather than just for the public to get actively involved in structural biology research? Citizen science projects can require areas for citizen science as structural problems both are amenable to human spatial-reasoning skills

  11. Additive and multiplicative renormalization of topological charge with improved gluon/fermion actions: A test case for 3-loop vacuum calculations, using overlap or clover fermions

    E-Print Network [OSTI]

    A. Skouroupathis; H. Panagopoulos

    2006-01-02T23:59:59.000Z

    We calculate perturbative renormalization properties of the topological charge, using the standard lattice discretization given by a product of twisted plaquettes. We use the overlap and clover action for fermions, and the Symanzik improved gluon action for 4- and 6-link loops. We compute the multiplicative renormalization of the topological charge density to one loop; this involves only the gluon part of the action. The power divergent additive renormalization of the topological susceptibility is calculated to 3 loops. Our work serves also as a test case of the techniques and limitations of lattice perturbation theory, it being the first 3-loop computation in the literature involving overlap fermions.

  12. Construction and installation of low-cost energy-conservation devices on existing residential structures. Final report

    SciTech Connect (OSTI)

    None

    1983-01-01T23:59:59.000Z

    Through the Neighborhood Housing Services, Incorporated of Charlotte, a series of hands-on workshops and a demonstration site was provided to enable residents of the Plaza-Midwood Neighborhood to build and install a variety of low-cost, durable, small scale, energy conservation systems. This experimental approach enabled homeowners to apply specific technologies to their own homes. These cost effective measures were designed to encourage both self reliance and the use of renewable resources. The weekend projects included protected entry, numerous moveable window insulation devices, solar air collector/greenhouse, window greenhouse and water storage tubes. The building used for retrofit was the office for the Neighborhood Housing Services (NHS), a non-profit corporation formed to help revitalize residential structures and maintain the economic, racial, and social character of existing neighborhoods. The particular neighborhood involved was Plaza-Midwood and covers approximately a 2 square mile area. The neighborhood housing stock is of the 1910 to 1940 variety with the predominate architectual style being bungalow frame, having 1000 to 1900 square feet in area. The neighborhood is a racially integrated one, with about 70% of the residents being homeowners. An estimated 1700 housing units are in this area. The NHS office presently serves as a resource center for area residents who need loans and/or construction assistance. Providing a continuing educational program is a function of this organization. The Grant provided a significant contribution as a resource for energy conservation mined residents. A resource room displaying procedures and diagrams for the various projects in this proposal was established. Additional resource literature was provided and used by local residents.

  13. Oil and gas: Oilfield class actions

    SciTech Connect (OSTI)

    McArthur, J.B.

    1997-06-01T23:59:59.000Z

    The use of class actions is getting alot of attention in the oilfield. Plaintiffs have filed class actions challenging two of the most rooted industry practices, oil posted prices and deregulated natural gas affiliate deduction and charges. The classes will include tens or hundreds of thousands of plaintiffs and may transform two of the industry`s most settled practices. The emotions surrounding the class action risk obscuring the fact that it is an old and oft-used tool in oilfield litigation. The class action {open_quotes}provides a means by which, where a large group of persons are interested in a matter, one or more may sue or be sued as representatives of the class without needing to join every member of the class.{close_quotes} The procedure avoids waste by combining scattered disputes, even if some injured might sue individually, and it enables plaintiffs who could not afford to sue to be represented anyway. The lawyers draw their fees from any recovery. Almost all oilpatch class actions are brought to resolve a {open_quotes}common question{close_quotes} under Federal Rules of Civil Procedure 23(b)(3) or state counterparts. The rule`s {open_quotes}opt-out{close_quotes} provisions give class actions a tremendous boost because members stay in unless they take steps to get out. This article discusses present and future class actions.

  14. On QCD Thermodynamics with Improved Actions

    E-Print Network [OSTI]

    Karsch, Frithjof

    1998-01-01T23:59:59.000Z

    We discuss recent advances in the calculation of thermodynamic observables using improved actions. In particular, we discuss the calculation of the equation of state of the SU(3) gauge theory, the critical temperature in units of the string tension, the surface tension and the latent heat at the deconfinement transition. We also present first results from a calculation of the equation of state for four-flavour QCD using an O(a^2) improved staggered fermion action and discuss possible further improvements of the staggered fermion action.

  15. SENSORY SUBSTITUTION : PERCEPTION DEDICATED TO ACTION Cognitive processes involved in the utilization of a simple visuo-tactile sensory prosthesis

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    in the utilization of a simple visuo-tactile sensory prosthesis Hardy B.1 ., Ramanantsoa M.-M.1 , Hanneton S.12 by a visuo-tactile prosthesis can be used for motor behaviour. In this aim, we used the most simple modes in the prosthesis utilisation. Indeed, in the visuo-manual co-ordination paradigm, it is useful

  16. Estrogen and cyclic amp action, and the involvement of the cytoskeleton on gap junction formation in rat myometrium

    E-Print Network [OSTI]

    Gaddy, Dana

    1985-01-01T23:59:59.000Z

    ), (-)-isoproterenol (ISO), and dl-propranolol (PROP) were purchased from Sigma Chemical Co. (St. Louis, MO). Prostaglandin F2o (PGF) was used as the dinoprost tromethamine salt in Lutalyse (Upjohn, kalamazoo, liI). Dulbecco's phosphate buffered saline (PBS... studies are listed in I'able I. E2B was dissolved in sesame oil. ISO, PROP, COL, CVT. B, and PGEI were dissolved in Du lbecco's VBS. PGF was given in 1 mg doses. All injections were delivered intraperitoneal ly in 200 ul volumes of hormone carrier...

  17. Enforcement actions: Significant actions resolved. Volume 14, No. 2, Part 1: Individual actions. Quarterly progress report, April--June 1995

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1995) and includes copies of Orders sent by the Nuclear Regulatory Commission to individuals with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

  18. An Illustration of the Corrective Action Process, The Corrective Action Management Unit at Sandia National Laboratories/New Mexico

    SciTech Connect (OSTI)

    Irwin, M.; Kwiecinski, D.

    2002-02-26T23:59:59.000Z

    Corrective Action Management Units (CAMUs) were established by the Environmental Protection Agency (EPA) to streamline the remediation of hazardous waste sites. Streamlining involved providing cost saving measures for the treatment, storage, and safe containment of the wastes. To expedite cleanup and remove disincentives, EPA designed 40 CFR 264 Subpart S to be flexible. At the heart of this flexibility are the provisions for CAMUs and Temporary Units (TUs). CAMUs and TUs were created to remove cleanup disincentives resulting from other Resource Conservation Recovery Act (RCRA) hazardous waste provisions--specifically, RCRA land disposal restrictions (LDRs) and minimum technology requirements (MTRs). Although LDR and MTR provisions were not intended for remediation activities, LDRs and MTRs apply to corrective actions because hazardous wastes are generated. However, management of RCRA hazardous remediation wastes in a CAMU or TU is not subject to these stringent requirements. The CAMU at Sandia National Laboratories in Albuquerque, New Mexico (SNL/NM) was proposed through an interactive process involving the regulators (EPA and the New Mexico Environment Department), DOE, SNL/NM, and stakeholders. The CAMU at SNL/NM has been accepting waste from the nearby Chemical Waste Landfill remediation since January of 1999. During this time, a number of unique techniques have been implemented to save costs, improve health and safety, and provide the best value and management practices. This presentation will take the audience through the corrective action process implemented at the CAMU facility, from the selection of the CAMU site to permitting and construction, waste management, waste treatment, and final waste placement. The presentation will highlight the key advantages that CAMUs and TUs offer in the corrective action process. These advantages include yielding a practical approach to regulatory compliance, expediting efficient remediation and site closure, and realizing potentially significant cost savings compared to off-site disposal. Specific examples of CA MU advantages realized by SNL/NM will be presented along with the above highlighted process improvements, Integrated Safety Management System (ISMS) performance, and associated lessons learned.

  19. Regulation of the genes involved in nitrification.

    SciTech Connect (OSTI)

    Arp, D.J.; Sayavedra-Soto, L.A.

    2003-08-14T23:59:59.000Z

    OAK-B135 This project focuses on the characterization of the regulation of the genes involved in nitrification in the bacterium Nitrosomonas europaea. The key genes in the nitrification pathway, amo and hao, are present in multiple copies in the genome. The promoters for these genes were identified and characterized. It was shown that there were some differences in the transcriptional regulation of the copies of these genes.

  20. Community Involvement Fund | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsNovember 13, 2014 BuildingEnergy EfficiencyPast ProjectsCommunity Involvement

  1. Understanding the EPA guidance on major source determinations for military installations

    SciTech Connect (OSTI)

    Ling, A.D. [Dept. of the Navy, Washington, DC (United States)

    1997-12-31T23:59:59.000Z

    In August 1996, the Environmental Protection Agency (EPA) issued the first ever Clean Air Act (CAA) guidance directed specifically at military facilities. The Guidance, titled Major Source Determinations for Military Installations under the Air Toxics, New Source Review and Title V Operating Permit Programs of the Clean Air Act, was negotiated by an EPA/DoD workgroup that included field and headquarters EPA and DoD representatives, and was led by the Navy. This paper describes the development and contents of the guidance and the significant legal and policy issues raised. By statute and rule, all sources under common control on contiguous or adjacent property and belonging to the same two digit Standard Industrial Classification (SIC) Code must be aggregated when determining if the source is a major source. DoD requested that EPA develop the guidance because of a move by EPA to impose a fenceline-to-fenceline interpretation of what constitutes a major source for purposes of the three programs identified above. Such an interpretation could and did result in more stringent regulation of industrial sources on military installations than of similar industrial plants. The guidance establishes EPA`s allowable interpretation of two of the three key elements of the major source definition. First, the guidance specifies that common control occurs at the military service level; therefore, sources belonging to the Army, Navy, Marine Corps, Air Force, the National Guard or a Defense Agency that are located on the same installation could each be treated separately. Second, the guidance allows the military to assign SIC codes to functional industrial groupings in a manner similar to the private sector. Past practice grouped all national defense activities under the same SIC code.

  2. Effect of gaps on the performance of the vertically installed wet thermal insulator

    SciTech Connect (OSTI)

    Kim, S. H.; Kim, Y. I.; Park, C. T.; Choi, S.; Yoon, J. [Korea Atomic Energy Research Inst., Daeduk-daero 989-111, Yuseong-Gu, Daejeon, 305-353 (Korea, Republic of)

    2012-07-01T23:59:59.000Z

    In SMART, the main flow path of the reactor coolant and the pressurizer partially share common walls in the reactor coolant system. To reduce this heat transfer, the wet thermal insulator (WTI) is installed on the inner wall of the pressurizer. The WTI is constituted of stacked thin stainless steel plates. The water layer width between the plates is chosen to suppress natural convection in each layer. The plates of the WTI require clearance for thermal expansion. When the WTI is installed on a vertical wall, this clearance might cause gaps at the top and bottom at the operating condition. In this study, we focused on the effect of gaps at the both ends on the WTI performance. A numerical simulation was conducted for an 8-layer WTI with gaps at the both ends. To compare with this, a simulation of a WTI without a gap, which is an ideal case, was also conducted. The simulation was conducted in a 2-dimensional manner by a commercial computational fluid dynamics code, FLUENT. The simulations showed that the WTI thermal performance was substantially decreased by a flow that circulated through the top and bottom gaps and water layers at the sides of the WTI. This circulation caused a high temperature difference between the wall and the circulating flow. To find a way to prevent this performance deterioration of the WTI we simulated several cases with the smaller gap heights. However, the flow circulation and the higher heat transfer rate were still observed even at a case with the smallest gap, which seems to be hardly achievable in a real installation. Another way of reducing the flow circulation was suggested and also simulated in this study. (authors)

  3. Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010

    E-Print Network [OSTI]

    Darghouth, Naim

    2012-01-01T23:59:59.000Z

    systems, Tracking the Sun IV: The Installed Cost of PhotovoltaicsSystems Tracking the Sun IV: The Installed Cost of Photovoltaicsof Photovoltaics in the U.S. from 1998-2010 Systems with

  4. Redesign of Electrical Installations to Maximize the Use of Photo Voltaic (PV) Cells at the End Use of Consumers in Kuwait 

    E-Print Network [OSTI]

    Alatrash, J.; Mhaisen, N.; Ismail, Z.

    2010-01-01T23:59:59.000Z

    A new idea of redesigning the electrical installations inside residential premises is presented in this paper. The idea is based on having two separate circuits' installations. The first is A.C circuit which can be served ...

  5. Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010

    E-Print Network [OSTI]

    Darghouth, Naim

    2012-01-01T23:59:59.000Z

    Efficiency Tracking the Sun IV: The Installed Cost of Photovoltaicsefficiency ratings for ftp://ftp.bls.gov/pub/special.requests/cpi/cpiai.txt Tracking the Sun IV: The Installed Cost of Photovoltaics

  6. Tracking the Sun V: An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2011

    E-Print Network [OSTI]

    Barbose, Galen

    2014-01-01T23:59:59.000Z

    Building-Integrated Photovoltaics (BIPV) in the ResidentialV: The Installed Price of Photovoltaics in the United StatesV: The Installed Price of Photovoltaics in the United States

  7. Byers Auto Group: A Case Study Into The Economics, Zoning, and Overall Process of Installing Small Wind Turbines at Two Automotive Dealerships in Ohio (Presentation)

    SciTech Connect (OSTI)

    Sinclair, K.; Oteri, F.

    2011-05-01T23:59:59.000Z

    This presentation provides the talking points about a case study on the installation of a $600,000 small wind project, the installation process, estimated annual energy production and percentage of energy needs met by the turbines.

  8. Byers Auto Group: A Case Study Into The Economics, Zoning, and Overall Process of Installing Small Wind Turbines at Two Automotive Dealerships in Ohio

    SciTech Connect (OSTI)

    Oteri, F.; Sinclair, K.

    2011-11-01T23:59:59.000Z

    This paper provides the talking points about a case study on the installation of a $600,000 small wind project, the installation process, estimated annual energy production and percentage of energy needs met by the turbines.

  9. The Sector Collector of the CMS DT Trigger system: Installation and Performance

    E-Print Network [OSTI]

    Travaglini, R

    2008-01-01T23:59:59.000Z

    Drift Tubes chambers are used for muon detection in the central region of the CMS experiment at LHC. Custom electronics is used for reconstructing muon track segments and for triggering the CMS readout. The trigger Sector Collector modules collect muon segments identified by the on-chamber devices, synchronize the data received from different chambers and convert from LVDS to Optical for transmission to the off-detector electronics. Installation and integration tests were developed for tuning both firmware and hardware of the Sector Collector system: results are reviewed. The system performance during CMS data taking with cosmic rays is discussed.

  10. The Creation of a French Basic Nuclear Installation - Description of the Regulatory Process - 13293

    SciTech Connect (OSTI)

    Mahe, Carole [CEA Marcoule - BP17171 - 30207 Bagnols-Sur-Ceze (France)] [CEA Marcoule - BP17171 - 30207 Bagnols-Sur-Ceze (France); Leroy, Christine [CEA Cadarache - 13108 Saint Paul-Lez-Durance (France)] [CEA Cadarache - 13108 Saint Paul-Lez-Durance (France)

    2013-07-01T23:59:59.000Z

    CEA is a French government-funded technological research organization. It has to build a medium-level waste interim storage facility because the geological repository will not be available until 2025. This interim storage facility, called DIADEM, has to be available in 2017. These wastes are coming from the research facilities for spent fuel reprocessing and the dismantling of the most radioactive parts of nuclear facilities. The CEA handles the waste management by inventorying the needs and updating them regularly. The conception of the facility is mainly based on this inventory. It provides quantity and characteristics of wastes and it gives the production schedule until 2035. Beyond mass and volume, main characteristics of these radioactive wastes are chemical nature, radioisotopes, radioactivity, radiation dose, the heat emitted, corrosive or explosive gas production, etc. These characteristics provide information to study the repository safety. DIADEM mainly consists of a concrete cell, isolated from the outside, wherein stainless steel welded containers are stored, stacked in a vertical position in the racks. DIADEM is scheduled to store three types of 8 mm-thick, stainless steel cylindrical containers with an outside diameter 498 mm and height from 620 to 2120 mm. DIADEM will be a basic nuclear installation (INB in French) because of overall activity of radioactive substances stored. The creation of a French basic nuclear installation is subject to authorization according to the French law No. 2006-686 of 13 June 2006 on Transparency and Security in the Nuclear Field. The authorization takes into account the technical and financial capacities of the licensee which must allow him to conduct his project in compliance with these interests, especially to cover the costs of decommissioning the installation and conduct remediation work, and to monitor and maintain its location site or, for radioactive waste disposal installations, to cover the definitive shut-down, maintenance and surveillance expenditure. The authorization is issued by a decree adopted upon advice of the French Nuclear Safety Authority and after a public enquiry. In accordance with Decree No. 2007-1557 of November 2, 2007, the application is filed with the ministries responsible for nuclear safety and the Nuclear Safety Authority. It consists of twelve files and four records information. The favorable opinion of the Nuclear Safety Authority on the folder is required to start the public inquiry. Once the public inquiry is completed, the building permit is issued by the prefect. (authors)

  11. Texas LoanSTAR Monitoring and Analysis Program: Monitoring Equipment Installation Manual (October 1994)

    E-Print Network [OSTI]

    Bohmer, C.; Lippman, R.; McBride, J.; Casebolt, C.

    1994-01-01T23:59:59.000Z

    by which the apparent power (amperes times volts) must be adjusted to obtain real power. Power in any single-phase or 3 phase 4 wire (3$-$W) system is equal to the sum of the power in the individual phases. The formula below is used to calculate power... the RTD output, reads the resistance which increases linearly with temperature, and calculates the temperature. For installations with long sensor lead lengths, the resistance of signal wire should be determined, and the DAS input channel must be offset...

  12. Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy

    SciTech Connect (OSTI)

    Maples, B.; Saur, G.; Hand, M.; van de Pieterman, R.; Obdam, T.

    2013-07-01T23:59:59.000Z

    Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

  13. Measurement-Based Evaluation of Installed Filtration System Performance in Single-Family Homes

    SciTech Connect (OSTI)

    Chan, Wanyu Rengie; Singer, Brett C.

    2014-04-03T23:59:59.000Z

    This guide discusses important study design issues to consider when conducting an on-site evaluation of filtration system performance. The two most important dichotomies to consider in developing a study protocol are (1) whether systems are being evaluated in occupied or unoccupied homes and (2) whether different systems are being compared in the same homes or if the comparison is between systems installed in different homes. This document provides perspective and recommendations about a suite of implementation issues including the choice of particle measurement devices, selection of sampling locations, ways to control and/or monitor factors and processes that can impact particle concentrations, and data analysis approaches.

  14. Development and Use of Baseline Monthly Utility Models for Eight Army Installations Around the United States

    E-Print Network [OSTI]

    Reddy, T. A.; Saman, N. F.; Claridge, D. E.; Haberl, J. S.; Turner, W. D.

    1996-01-01T23:59:59.000Z

    3/96-Final Report, p. i ESL-TR-96/03-01 DEVELOPMENT AND USE OF BASELINE MONTHLY UTILITY MODELS FOR EIGHT ARMY INSTALLATIONS AROUND THE UNITED STATES Prepared by: T.A. Reddy, N.F. Saman, D.E. Claridge, J.S. Haberl and W.D. Turner Research Sponsored... and Scope 2 2.1 Objectives 2 2.2 Data provided 3 2.3 Scope of study 7 3.0 Mathematical Basis of Regression Models 8 3.1 Pertinent background 8 3.2 Simple regression models using Emodel 9 3.3 Generation of 95% uncertainty bands for individual months 14 3...

  15. Handbook of experiences in the design and installation of solar heating and cooling systems

    SciTech Connect (OSTI)

    Ward, D.S.; Oberoi, H.S.

    1980-07-01T23:59:59.000Z

    A large array of problems encountered are detailed, including design errors, installation mistakes, cases of inadequate durability of materials and unacceptable reliability of components, and wide variations in the performance and operation of different solar systems. Durability, reliability, and design problems are reviewed for solar collector subsystems, heat transfer fluids, thermal storage, passive solar components, piping/ducting, and reliability/operational problems. The following performance topics are covered: criteria for design and performance analysis, domestic hot water systems, passive space heating systems, active space heating systems, space cooling systems, analysis of systems performance, and performance evaluations. (MHR)

  16. Engineering study - installation of new risers in Single-Shell Tanks

    SciTech Connect (OSTI)

    Magruder, W.J.

    1994-08-01T23:59:59.000Z

    A sampling program is being developed to characterize the 149 underground SSTs on the Hanford Site. The sampling effort will require access to the tank interior in a minimum of two locations per tank. Some of the risers suitable for sampling are either unavailable or are not in locations for proper characterization of the tank contents. Additional risers will be required in the SSTs to support the tank characterization sampling program. The purpose of this engineering study is to review alternatives for installation of new riser in the SSTs.

  17. Series 50 propane-fueled Nova bus: Engine development, installation, and field trials

    SciTech Connect (OSTI)

    Smith, B.

    1999-01-01T23:59:59.000Z

    The report describes a project to develop the Detroit Diesel series 50 liquefied propane gas (LPG) heavy-duty engine and to conduct demonstrations of LPG-fuelled buses at selected sites (Halifax Regional Municipality and three sites in the United States). The project included five main elements: Engine development and certification, chassis re-engineering and engine installation, field demonstration, LPG fuel testing, and LPG fuel variability testing. Lessons learned with regard to engine design and other issues are discussed, and recommendations are made for further development and testing.

  18. Safety assessment of discharge chute isolation barrier preparation and installation activities. Revision 3

    SciTech Connect (OSTI)

    Meichle, R.H.

    1994-11-08T23:59:59.000Z

    This revision adds a section addressing impacts of dropping surfacing tool and rack cutter on the basin floor, and corrects typographical errors. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparisons of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions was made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classifications.

  19. QER- Comment of Berkshire Environmental Action Team

    Broader source: Energy.gov [DOE]

    Dear members of the Quadrennial Energy Review Task Force, Please find attached comments from the Berkshire Environmental Action Team, Inc. (BEAT) regarding the proposed natural gas pipeline expansion. Thank you for considering our comments.

  20. Philadelphia, Pennsylvania: Solar in Action (Brochure), Solar...

    Broader source: Energy.gov (indexed) [DOE]

    October 2011 Solar in Action Philadelphia was designated by the U.S. Department of Energy (DOE) on March 28, 2008, as Solar America City. At that time, the city presented a...