Powered by Deep Web Technologies
Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Re: BPA FY 07-09 Project Proposal #200711200 Teanaway Watershed Protection and Restoration  

E-Print Network (OSTI)

Re: BPA FY 07-09 Project Proposal #200711200 Teanaway Watershed Protection and Restoration Kittitas draft province recommendations). The conservation easements acquisition costs qualify for funding by BPA as a Capital investment, as indicated in the Project Narrative on page 8. Proposed Project Funding Allocation

2

BPA / Doe Memo Template  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Watershed Management Program EIS (DOE/EIS-0265/SA-90) Watershed Management Program EIS (DOE/EIS-0265/SA-90) David Byrnes TO: Fish and Wildlife Project Manager, KEWL-4 Proposed Action: Naches River Water Treatment Plant Intake Screening Project Project No: 2002-052-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 4.23 Intake and Return Diversion Screens, 9.23 Construction: Erosion and Sediment Control Structures. Location: Yakima, Washington Proposed by: Bonneville Power Administration (BPA) and the City of Yakima Description of the Proposed Action: BPA is proposing to fund the upgrade of the intake structure for the City of Yakima's Water Treatment Plant. The existing traveling water screen at

3

Environmental Assessment - Proposed Actions  

NLE Websites -- All DOE Office Websites (Extended Search)

availability of Waste availability of Waste Isolation Pilot Plant (WIPP) facilities and infrastructure to scientists who wish to conduct experiments there. DOE would allow these experiments if they can be conducted without interfering with the WIPP's primary transuranic waste disposal mission and if they reflect contemporary budget priorities. This fact sheet presents questions and answers about the proposed action and its alternative. The deep geologic repository at the WIPP could provide a favorable environment for exper- iments in many scientific disciplines, including particle astrophysics, waste repository sci- ence, mining technology, low radiation dose physics, fissile materials accountability and transparency, and deep geophysics. Los Alamos National Laboratory has been conducting

4

Description of Proposed Action  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carlsbad Field Office Carlsbad Field Office RECORD OF CATEGORICAL EXCLUSION DETERMINATION 1 Description of Proposed Action Performance of a three-dimensional seismic survey line on approximately 2,409 acres contained within the WIPP Land Withdrawal Area as part of a larger survey to determine whether hydrocarbons are present in the region in quantities that warrant extraction and development. Number and Title of Applicable Categorical Exclusion B3.1 Site Characterization/Environmental Monitoring Activities covered by this Categorical Exclusion include, but are not limited to, site characterization and environmental monitoring under CERCLA and RCRA. Specific activities include, but are not limited to: (a) Geological, geophysical (such as gravity, magnetic, electrical, seismic, and radar), geochemical, and

5

BPA Statutes.  

DOE Green Energy (OSTI)

This report contains the Bonneville Power Administration's (BPA's) authorizing statutes--the Bonneville Project Act, the Federal Columbia River Transmission System Act, the Pacific Northwest Electric Power Planning and Conservation Act and other laws that contain provisions that define BPA's mission and affect the way it is carried out.

United States. Bonneville Power Administration.

1999-08-01T23:59:59.000Z

6

BPA Statutes.  

SciTech Connect

This publication includes the Bonneville Power Administration`s (BPA) authorities. It combines the two previous booklets of BPA authorities` and adds: sections of certain Appropriation Acts affecting BPA; a list of all other Appropriation Acts affecting BPA; a list of the acts authorizing Federal hydroelectric dams in the Columbia River Basin; portions of the Energy Policy Act of 1992 that specifically apply to BPA; portions of the Federal Power Act to provide context for the Energy Policy Act. The laws are in their United States Code format, rather than in the Public Law format as passed. Thus, the citation for Bonneville Project Act section 2(f) is shown as 16 USC {section}832a(f). Most people are familiar with the Public Law citations, so they have been retained and appear in italics at the end of each paragraph. In addition, later amendments to earlier laws are reflected in the United States Code language. For example, the Preference Act`s definition of ``Pacific Northwest`` (16 USC {section}837(b)) reflects the Northwest Power Act`s amendment of that term. The laws are presented in the numerical order they appear in the United States Code, rather than in the order in which they became law. Therefore, the Energy Policy Act of 1992 is presented first. This booklet is not, nor is it intended to be, an official reporter. All citations should be made to the United States Code or some other officially recognized reporter.

United States. Bonneville Power Administration.

1995-01-01T23:59:59.000Z

7

Riverland expedited response action proposal  

SciTech Connect

The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Riverland Railroad Car Wash Pit and the 600 Area Army Munitions Burial Site. A non-time-critical ERA proposal includes preparation of an engineering evaluation/cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA proposal will undergo reviews by Westinghouse Hanford Company (WHC), DOE, EPA, Ecology, and the public. Ecology and EPA will issue an Action Agreement Memorandum after resolution of all review comments. The, memorandum will authorize remediation activities. The ERA goal is to reduce the potential for any contaminant migration to the soil column, groundwater, and Columbia River. The ERA may be the final remediation of the 100-IU-1 Operable Unit. A No Action Record of Decision may be issued after cleanup completion.

Not Available

1993-04-01T23:59:59.000Z

8

Proposed Revenues, Financial Strategy, and Program Costs for FY 1992 and 1993 : Technical Appendix, BPA Programs in Perspective.  

Science Conference Proceedings (OSTI)

Programs in Perspective is the Bonneville Power Administration's public involvement process (PIP) for engaging customers and other stakeholders in a regional dialog to set strategic direction and broad program plans for BPA effort. This planning leads into a biennial rate setting cycle and offers a more accessible and flexible opportunity for dialog on broad issues than is possible under the strict administrative procedures of ratemaking. The self-financed character of BPA has made this public process a necessary and valuable one to assure that those who pay BPA's rates have a clear understanding and a strong voice in the plans for use of the resulting revenues. During 1989, the previous PIP engaged the region in discussion of major strategic, issues focussing on major areas. In 1990, BPA seeks discussion of the directions and plans specifically for fiscal years 1992 and 1993. The steps taken for those years will lay the foundation for the years beyond. Thus, we have subtitled this year's process, Staying fit for the long run.'' We have consulted extensively with customers and others in the region in developing these plans. In dozens of program--specific meetings, BPA staff have talked and listened to what others think our plans ought to be. PIP now gives us a chance to review their sum total, along with projections for revenues and our overall financial position. 8 tabs., 8 figs.

United States. Bonneville Power Administration.

1990-07-01T23:59:59.000Z

9

Bonneville Power Administration (Bpa) Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1994/01_cover.html[6/27/2011 11:57:49 AM] 1994/01_cover.html[6/27/2011 11:57:49 AM] Final Environmental Impact Statement (DOE/eis-0194) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Action: Tenaska Washington II Generation Project State Involved: Washington Abstract: BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson

10

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana Summary This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy

11

Implementation Proposal for the National Action Plan on Demand...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for the National Action Plan on Demand Response - July 2011 Implementation Proposal for the National Action Plan on Demand Response - July 2011 Report to...

12

N Springs expedited response action proposal  

SciTech Connect

Since signing the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in 1989, the parties to the agreement have recognized the need to modify the approach to conducting investigations, studies, and cleanup actions at Hanford. To implement this approach, the parties have jointly developed the Hanford Past-Practice Strategy. The strategy defines a non-time-critical expedited response action (ERA) as a response action ``needed to abate a threat to human health or welfare or the environment where sufficient time exists for formal planning prior to initiation of response. In accordance with the past-practice strategy, DOE proposes to conduct an ERA at the N Springs, located in the Hanford 100 N Area, to substantially reduce the strontium-90 transport into the river through the groundwater pathway. The purpose of this ERA proposal is to provide sufficient information to select a preferred alternative at N Springs. The nature of an ERA requires that alternatives developed for the ERA be field ready; therefore, all the technologies proposed for the ERA should be capable of addressing the circumstances at N Springs. A comparison of these alternatives is made based on protectiveness, cost, technical feasibility, and institutional considerations to arrive at a preferred alternative. Following the selection of an alternative, a design phase will be conducted; the design phase will include a detailed look at design parameters, performance specifications, and costs of the selected alternative. Testing will be conducted as required to generate design data.

Not Available

1994-01-01T23:59:59.000Z

13

BPA/Lower Valley Transmission Project Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Summary Summary * The Purpose and Need for Action * Alternatives * Affected Environment * Impacts This summary gives the major points of the Final Environmental Impact Statement (EIS) prepared for the BPA/Lower Valley Transmission Project by Bonneville Power Administration (BPA). BPA is the lead federal agency on this project and supervises the preparation of the EIS. The U.S. Forest Service is a cooperating agency and assists BPA in EIS preparation. The Targhee and Bridger-Teton National Forests are crossed by BPA's existing transmission line and some of the alternatives. S.1 Purpose and Need For Action S.1.1 BPA Lower Valley Power and Light, Inc. (LVPL) buys electricity from BPA and then supplies it to the residences, farms and businesses of the Jackson and Afton, Wyoming areas. Since the late 1980s,

14

Chapter 2 - Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

2-1 CHAPTER 2 PROPOSED ACTION AND ALTERNATIVES The WIPP facility, in addition to serving its primary mission as a TRU waste disposal site, needs to perform a variety of actinide chemistry experiments to (1) support WIPP's recertification efforts, (2) address scientific questions important to WIPP, (3) improve TRU waste characterization techniques, and (4) improve DOE's understanding of how the waste interacts with the natural environment in order to better understand waste isolation performance. In the past, WIPP-related actinide chemistry experiments have taken place at DOE laboratory facilities at other DOE sites such as LANL. However, due to reductions in travel budgets and additional security requirements being imposed on DOE weapons

15

Bonneville Power Administration (BPA)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Staff version which still requires senior executive review Staff version which still requires senior executive review Office of Office of Human Capita Human Capital Management Management Bonneville Power Administration Risk Informed Human Capital - Workforce Plan 2007-2009 September 15, 2006 2007 BPA Risk Informed Human Capital - Workforce Plan Table of Contents INTRODUCTION............................................................................................................. 5 Impact of the 2006 Workforce Plan ..............................................................................................6 BPA Strategic Objectives as drivers of the WP .......................................................................... 6 I. CONTEXT ................................................................................................................... 6

16

Implementation Proposal for The National Action Plan on Demand Response |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for The National Action Plan on Demand Implementation Proposal for The National Action Plan on Demand Response Implementation Proposal for The National Action Plan on Demand Response August 1, 2011 - 3:54pm Addthis EXECUTIVE SUMMARY The staff of the Federal Energy Regulatory Commission (FERC) and the U.S. Department of Energy (DOE) developed this implementation proposal as required by section 529 of the Energy Independence and Security Act of 2007 (EISA).1 In particular, this proposal complies with EISA's mandate "to submit to Congress a proposal to implement the [National] Action Plan [on Demand Response], including specific proposed assignments of responsibility, proposed budget amounts, and any agreements secured for participation from State and other participants."2 The objective of the proposal is to implement the National Action Plan to

17

ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE  

Office of Legacy Management (LM)

ACTION DESCRIPTION MEMORANDUM ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE UNIVERSITY OF CHICAGO CONTAMINATED AS A RESULT OF PREVIOUS MED/AEC ACTIVITIES Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois December 1983 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee II-39 CONTENTS Page Summary of Proposed Action ....................... 1 Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. 1 Background and Need for Action ..................... 2 Proposed Remedial Action ........................ 3 Potential Issues ................... ......... 4 Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. 6 Tables. ............ .................. 7 References ................... ............ 8

18

Categorical Exclusion Determination Form Proposed Action Title...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(MOFs) that can be regenerated electrically for use in future high efficiency electric vehicle (EV) heat pumps. Proposed work consists of indoor laboratory-based research and...

19

Chapter 2 Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

for the other proposed improvements based on a conceptually defined site "buildout" scenario. A bounding analysis uses simplifying assumptions and analytical methods that are...

20

BPA SF6 Emission Info  

NLE Websites -- All DOE Office Websites (Extended Search)

BPA SF 6 Emission Info Steve Lowder - 2012.12 slide 1 Discovering Emission Locations slide 2 BPA uses a FLIR leak detection camera (other methods available) Allows leaks to...

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

4.0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES 0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES This chapter evaluates the environmental consequences of the proposed action (Section 4.1) and of the alternatives (Section 4.2) . The analysis focuses primarily on impacts associated with routine operation of the glass melter. In some instances (such as human health) , additional analysis is provided for accident conditions. 4.1 THE PROPOSED ACTION The proposed action was evaluated to determine the potential impacts of a number of environmental components, including air quality, surface water quality, and biological resources, as well as the potential effects to human health and safety. The potential impacts to these receptors are evaluated in the following subsections. No impact pathways were identified for land use, socioeconomics, or groundwater resources.

22

4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND 4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES . This section describes potential environmental impacts of the proposed action and alternatives. If the proposed action is implemented, activities would be limited to existing facilities. A WERF modification would be required to allow for injection of an atomized aqueous waste stream into the incinerator lower chamber. The installation would be performed within the WERF incinerator/stabilization building and may use an existing incinerator access port. Installation work would be similar to many routine maintenance and modification actions at WERF. A detailed analysis of potential impacts from processing INEL-generated LL W at commercial facilities is not presented in this EA because specific commercial facilities and processes have not

23

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'u ", lt~Fs::::N 'u ", lt~Fs::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration proposes to construct a maintenance garage for heavy vehicles and equipment at the Springfield, Missouri facility. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: December 7,2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.15- Siting, construction or modification of support structures within or contiguous to an already developed area. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A & B to Subpart D. For classes of action listed in Appendix A or B, the following conditions are integral elements, i.e., to fit within a class, the

24

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

proposes to add additional shop and office space onto two existing facilities proposes to add additional shop and office space onto two existing facilities located at the Jonesboro, Arkansas Maintenance Facility. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: May 09, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart 0 , Part B1 .15- Siting, construction or modification, and operation of support buildings and structures within or contiguous to an already developed area . REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A & B to Subpart D. For classes of action listed in Appendix A or B, the following conditions are integral elements, i.e., to fit within a class,

25

Property:NEPA Proposed Action | Open Energy Information  

Open Energy Info (EERE)

Proposed Action Proposed Action Jump to: navigation, search Property Name NEPA Proposed Action Property Type Text Pages using the property "NEPA Proposed Action" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + NGP is proposing a geothermal development project which includes the construction and operation of power generation facilities, geothermal fluid production and injection well pads and wells, access roads, geothermal fluid pipelines, groundwater production wells, an electrical transmission line and switching station, and support facilities. NGP submitted an application (N-82701) and Plan of Development (PoD) to the BLM Winnemucca Field Office (WFO), for approval of a right-of-way (ROW) for those portions of the transmission line located on public lands managed by the BLM. SPPCo submitted an application (N-83479) to the BLM WFO for approval of a ROW for the electrical switching station to be built at the point of interconnection of the NGP transmission line with the existing SPPCo transmission line. An Operations Plan was submitted for approval to drill and test geothermal wells proposed on public land (within federal geothermal lease NVN-58196) which would be used for the project. A Utilization Plan was submitted for approval of utilization facilities proposed on public land to be used for the project. Geothermal Drilling Permits (GDPs) will be submitted for downhole casing and cementing engineering approval for each well as the project progresses.

26

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

install pole-mounted safety light(s) at the Gore, Oklahoma install pole-mounted safety light(s) at the Gore, Oklahoma substation facility. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: September 1, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart 0, Part B2.3- Installation of equipment for personnel safety and health. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A& B to Subpart D. For classes of action listed in Appendix A or B, the following conditions are integral elements, i.e., to fit within a class, the proposal must riot: (a.) Threaten a violation of applicable statutory, regulatory, or permit requirements for environment, safety, and health, including DOE and/or Executive Orders;

27

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Entergy Arkansas, Inc. (Entergy) proposes to establish an interconnection between the system of Southwestern Entergy Arkansas, Inc. (Entergy) proposes to establish an interconnection between the system of Southwestern Power Administration and the system of Entergy in Carroll County, Arkansas. The interconnection would require Entergy to construct a new switching station at the interconnection site in addition to an approximately 5 mile length of transmission line. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: April 11,2011 NUMBERS AND TIT!-ES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B4.12- Construction of electric powerlines approximately 10 miles in length or less, not integrating major new sources. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A & B to Subpart D. For classes

28

Microsoft Word - Updated Proposed Action 2004 SA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 27, 2004 December 27, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Fish and Wildlife Implementation Plan EIS (DOE/EIS-0312/SA-01) Sarah McNary Senior Policy Advisor Proposed Action: Updated Proposed Action (UPA) for the FCRPS Biological Opinion Remand Location: The action area of the UPA, including areas where the UPA directly or indirectly affects listed salmonids consists of the following areas: * The mainstem Columbia River, including and downstream of Libby and Hungry Horse dams and reservoirs; the Snake River below the confluence with the Salmon River; and the Clearwater River below Dworshak reservoir and dam, down to and including the Columbia River estuary and plume. * The estuary and plume, which includes the area immediately off the mouth of the Columbia

29

BPA_EA_Covers.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Boyer-Tillamook Access Road Improvement Project Preliminary Environmental Assessment September 2013 DOE/EA-1941 This page intentionally left blank. Boyer-Tillamook Access Road Improvement Project i September 2013 TABLE OF CONTENTS CHAPTER 1 Purpose of and Need for Proposed Action 1-1 1.1 Background 1-1 1.2 Need for Action 1-3 1.3 Purposes 1-3 1.4 Public Involvement 1-3 1.4.1 Scoping Comment Period 1-3 1.4.2 Preliminary EA Comment Period 1-4 CHAPTER 2 Proposed Action and Alternatives 2-1 2.1 Proposed Action 2-1 2.1.1 Roads 2-2 2.1.2 Retaining Wall Construction 2-10 2.1.3 Bridge and Arch Pipe Construction 2-11

30

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'IU "~I :~~~r;::::N 'IU "~I :~~~r;::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration proposes to perform aerial saw tree trimming activities along select portions of transmission line rights-of-ways located in eastern Oklahoma during the early winter of 2011. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: December 10, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.3- Routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (e.g., pathways, roads, and railroads), vehicles and equipment, and localized vegetation and pest control, during which operations may be suspended and resumed.

31

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

NLE Websites -- All DOE Office Websites (Extended Search)

CATEGORICAL EXCLUSION (CX) DETERMINATION CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration (Southwestern) proposes to obtain an easement for an existing access road which is located in Carroll County, Arkansas. The easement will serve to facilitate Southwestern's electrical utility vehicles accessing electrical transmission line 3008, near structure 33, in Carroll County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: January 28,2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.24- Transfer, lease, disposition or acquisition of interests in uncontaminated permanent or temporary structures, equipment therein, and only land that is necessary for use of

32

CATEGORICAL EXCLUSION CX DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Zi~Fs::::N Zi~Fs::::N CATEGORICAL EXCLUSION CX DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration (Southwestern) proposes to accommodate a request, on behalf of Farrell- Cooper Mining Company, to lower and bury a small section of Southwestern's electrical lines to allow for the crossing of a large piece of mining equipment through the transmission line rights-of-way in Haskell County, Oklahoma. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: September 15, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021 , Appendix B to Subpart D, Part B4.9- Grant or denial of requests for multiple use of transmission facility rights-of-way, such as grazing permits and crossing agreements, including electric lines, water lines, and

33

Categorical Exclusion (CX) Determination Proposed Action: Havre Substation, Stage 03.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Havre Substation, Stage 03. Havre Substation, Stage 03. Description of Proposed Action: The Western Area Power Administration (Western) is proposing to expand the Havre Substation approximately 150 ft to the north to accommodate a new delivery service from the newly built Herron Substation by Hill County. The expansion also converts the existing 115-kV single bus into a ring bus which will improve reliability. Western is also expanding the yard to the east to accommodate the replacement of the existing control building and control boards. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.11: Construction of electric power substations .. . or modification of existing substations and support facilities . Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

34

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~~Fs::::N ~~Fs::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration performed emergency construction activities to repair a levee, stabilize a bank, and complete drainage improvements as a result of damage incurred during recent heavy rains at the Jonesboro Maintenance Office and adjacent substation facility located in Craighead County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: September 15, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021 , Appendix B to Subpart 0 , Part B 2.5- Safety and environmental improvements of a facility, including replacement and upgrade of facility components, that do not result in a significant change in the

35

Sodium Dichromate Barrel Landfill expedited response action proposal  

SciTech Connect

The US Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Sodium Dichromate Barrel Landfill. The Sodium Dichromate Barrel Disposal Site was used in 1945 for disposal of crushed barrels. The site location is the sole waste site within the 100-IU-4 Operable Unit. The Waste Information Data System (WIDS 1992) assumes that the crushed barrels contained 1% residual sodium dichromate at burial time and that only buried crushed barrels are at the site. Burial depth is shallow since visual inspection finds numerous barrel debris on the surface. A non-time-critical ERA proposal includes preparation of an engineering evaluation and cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA goal is to reduce the potential for any contaminant migration from the landfill to the soil column, groundwater, and Columbia River. Since the landfill is the only waste site within the operable unit, the ERA will present a final remediation of the 100-IU-4 operable unit.

Not Available

1993-09-01T23:59:59.000Z

36

BPA.gov - Bonneville Power Administration  

NLE Websites -- All DOE Office Websites

Navigate Up This page location is: Agency Portal Prod - Internal Pages home Sign In About | Careers | Contact | bpa.gov Search News & Us Expand News & Us Projects & Initiatives...

37

BPA Headquarters Now “Gold Certified” for Sustainability  

Energy.gov (U.S. Department of Energy (DOE))

BPA recently became the first federal agency in Portland, Oregon, to achieve the city's Sustainability at Work Gold Certification for sustainability efforts at its headquarters building.

38

Oct 2009 final concurrence letter for BPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Justice Justice Office of Dispute Resolution - - Washington, D.C. 20530 October 22,2009 The Honorable Steven Chu Secretary for the U.S. Department of Energy Washington, D.C. 20585 - . -- - . Dear Secretary Chu, This is in reference to the letter dated January 15,2009, fiom your predecessor, Honorable Samuel W. Bodman, which accompanied a policy document outlining guidance for the use of binding arbitration in specified cases by the Bonneville Power Administration. The Attorney General has reviewed the document "Bonneville Power Administration's Guidance on the Use of Binding Arbitration for BPA Contracts" and concurs with the proposed policy for use of binding arbitration which is contained therein. Mr. Holder's concurrence is dated October 9,2009.

39

Microsoft Word - BPA DEIS TOC Abstract Summary.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement July 2010 DOE/EIS-0422 Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Draft Environmental Impact Statement Bonneville Power Administration July 2010 Abstract DEIS i Central Ferry - Lower Monumental 500-kilovolt Transmission Line Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Cooperating Agency: Washington Energy Facility Site Evaluation Council (EFSEC) Title of Proposed Project: Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, DOE/EIS - 0422 State Involved: Washington Abstract: BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would

40

Microsoft Word - BPA PFEIS Cover Abstract.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement February 2011 DOE/EIS-0422 Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Final Environmental Impact Statement Bonneville Power Administration February 2011 FEIS i Central Ferry - Lower Monumental 500-kilovolt Transmission Line Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Cooperating Agency: Washington Energy Facility Site Evaluation Council (EFSEC) Title of Proposed Project: Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, DOE/EIS - 0422 State Involved: Washington Abstract: BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(Southwestern) proposes to replace the shield wire, fiber-optic cable, (Southwestern) proposes to replace the shield wire, fiber-optic cable, conductor, structures, and all associated hardware on the Idalia to Asherville 161 kV, 22 mile transmission line located in Butler and Stoddard County, Missouri. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: October 13,2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B4.6- Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including , but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors,

42

BPA/Lower Valley Transmission Project Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 9 9 7 1 9 9 7 B PA / L O W E R VA L L E Y T R A N S M I S S I O N P R O J E C T Final Environmental Impact Statement DOE/EIS-0267 J U N E 1 9 9 8 Bonneville Power Administration PO Box 3621 Portland, Oregon 97208-3621 DOE/BP-3067 JUNE 1998 450 Final Environmental Impact Statement BPA/Lower Valley Transmission Project Bonneville Power Administration U.S. Department of Energy and Forest Service U.S. Department of Agriculture June 1998 Table of Contents - i Table of Contents Summary ............................................................................................................................ S-1 S.1 Purpose and Need For Action ................................................................................................ S-1 S.1.1 BPA ...............................................................................................................................................

43

To: ALLBPA Subject: Thank You Fellow BPA Employees:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19, 2013 8:11 AM 19, 2013 8:11 AM To: ALLBPA Subject: Thank You Fellow BPA Employees: I wanted to thank you all personally for your patience and professionalism during the past few days. As you may know, as a result of an inspection of BPA hiring practices, the Department of Energy Inspector General's Office posted a "Management Alert" which described the IG Office interim results and recommendations, as well as DOE's management response, which described actions DOE has taken. For those of you who have not seen the document, it is available at this link. Although the IG is continuing to audit the matter, the Management Alert comes on the heels of an

44

Biomass Power Association (BPA) | Open Energy Information  

Open Energy Info (EERE)

Biomass Power Association (BPA) Biomass Power Association (BPA) Jump to: navigation, search Tool Summary Name: Biomass Power Association (BPA) Agency/Company /Organization: Biomass Power Association Sector: Energy Focus Area: Biomass, - Biomass Combustion, - Biomass Gasification, - Biomass Pyrolysis, - Biofuels Phase: Determine Baseline, Evaluate Options, Develop Goals Resource Type: Guide/manual User Interface: Website Website: www.usabiomass.org Cost: Free References: Biomass Power Association[1] The website includes information on biomass power basics, renewable electricity standards, and updates on legislation affecting biomass power plants. Overview "The Biomass Power Association is the nation's leading organization working to expand and advance the use of clean, renewable biomass

45

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southwestern Power Administration (Southwestern) proposes to modify and/or construct several Arkansas, Southwestern Power Administration (Southwestern) proposes to modify and/or construct several Arkansas, Oklahoma, and Missouri communication tower facilities to facilitate the spectrum relocation of Federal communications systems in conjunction with the Commercial Spectrum Enhancement Act (CSEA, Title II of P.L. 108-494). Communication tower facility modifications and construction activities include 13 tower replacements, 16 tower removals, and 6 communication site dispositions. The 35 tower project locations, identified by state, include: ~ Arkansas- Hardy, Melbourne, Paragould, Piggott, Bethel, Bull Shoals, Norfork, Piggott, Poteau Mountain, Decatur, Sulphur Rock, Van Buren, Winesburg, and Humphrey ~ Oklahoma- Broken Bow Project Office, Broken Bow Powerhouse, Gore Substation, Lamar, Weleetka,

46

BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.  

SciTech Connect

Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

United States. Bonneville Power Administration.

1995-08-01T23:59:59.000Z

47

Critical in PROJECT TITLE COMMENTS BPA NPCC  

E-Print Network (OSTI)

is research and development, not capital construction. NPCC staff recommends designation as capital in the Hanford BPA phase 3. Overlaps with study funded by Grant PUD. 250322 250322 198605000 White Sturgeon

48

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

obtain an easement for an existing access road obtain an easement for an existing access road which is located in Carroll County, Arkansas. The easement will serve to facilitate Southwestern's electrical utility vehicles accessing electrical transmission line 3008, near structure 33, in Carroll County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: January 28, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.24- Transfer, lease, disposition or acquisition of interests in uncontaminated permanent or temporary structures, equipment therein, and only land that is necessary for use of the transferred structures and equipment, for residential, commercial, or industrial uses. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B):

49

Bonneville Power Administration (Bpa) Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary-1994.html[6/27/2011 11:54:25 AM] Summary-1994.html[6/27/2011 11:54:25 AM] TABLE OF CONTENTS Section Page S.0 SUMMARY S-1 S.1 INTRODUCTION S-1 S.2 PURPOSE OF AND NEED FOR ACTION S-1 S.2.1 Need S-1 S.2.2 Purpose S-4 S.3 BACKGROUND S-4 S.4 ALTERNATIVES INCLUDING THE PROPOSED ACTION S-5 S.4.1 Proposed Action S-5

50

Record of Decision for BPA Short-Term Marketing and Operating Arrangements (1/31/96)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Federal Register / Vol. 61, No. 21 / Wednesday, January 31, 1996 / Notices Bonneville Power Administration Notice of Availability of Record of Decision for Short-Term Marketing and Operating Arrangements AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Availability of Record of Decision (ROD). SUMMARY: BPA has decided to enter into short-term marketing and operational arrangements in order to participate continuously in the open electric power market. These arrangements would enable BPA to achieve the best reliability and expected economic outcome, as well as to best meet its environmental responsibilities, given diverse market conditions. This decision would support power cost control, enhance BPA competitiveness, and provide public benefits. The

51

SB 4 Interim Well Stimulation Treatment Regulations Notice of Proposed Emergency Rulemaking Action  

E-Print Network (OSTI)

SB 4 Interim Well Stimulation Treatment Regulations Notice of Proposed Emergency Rulemaking Action Page 1 of 10 SB 4 INTERIM WELL STIMULATION TREATMENT REGULATIONS NOTICE OF PROPOSED EMERGENCY that the California Department of Conservation (Department) proposes to adopt emergency regulations necessary

52

EIS-0385: Notice of Proposed Floodplain and Wetland Actions | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

385: Notice of Proposed Floodplain and Wetland Actions 385: Notice of Proposed Floodplain and Wetland Actions EIS-0385: Notice of Proposed Floodplain and Wetland Actions Site Selection for the Expansion of the Strategic Petroleum Reserve Announcement The Department of Energy (DOE) is preparing an environmental impact statement (EIS) for site selection for expansion of the Strategic Petroleum Reserve, as required by the Energy Policy Act of 2005. DOE hereby gives early notice that it will include in the Draft EIS a floodplain and wetland assessment prepared in accordance with the DOE Regulations for Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) and provides for early public input. DOE/EIS-0385, Department of Energy, Notice of Proposed Floodplain and Wetland Actions for the Site Selection for the Expansion of the Strategic

53

EIS-0385: Notice of Proposed Floodplain and Wetland Actions | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Floodplain and Wetland Actions Proposed Floodplain and Wetland Actions EIS-0385: Notice of Proposed Floodplain and Wetland Actions Site Selection for the Expansion of the Strategic Petroleum Reserve Announcement The Department of Energy (DOE) is preparing an environmental impact statement (EIS) for site selection for expansion of the Strategic Petroleum Reserve, as required by the Energy Policy Act of 2005. DOE hereby gives early notice that it will include in the Draft EIS a floodplain and wetland assessment prepared in accordance with the DOE Regulations for Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) and provides for early public input. DOE/EIS-0385, Department of Energy, Notice of Proposed Floodplain and Wetland Actions for the Site Selection for the Expansion of the Strategic

54

Proposed Action and Alternatives 2-40 Big Eddy-Knight Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Project Final EIS July 2011 Figure 2-18. View of BPA's Big Eddy Substation from Columbia View Drive (looking east) Figure 2-19. View of Entrance to Big Eddy...

55

Categorical Exclusion Determination Form Proposed Action Title: (0473-1601) Sandia National Laboratories -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

nergy nergy Categorical Exclusion Determination Form Proposed Action Title: (0473-1601) Sandia National Laboratories - Improved Power System Operations Using Advanced Stochastic Optimization Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): New Mexico, Iowa, Massachusetts, Washington, and California Proposed Action Description: Funding will support development of an integrated probabilistic decision-making software that can account for uncertain conditions that affect renewable energy sources to ensure reliable and efficient use of power system assets and enforce AC power flow constraints. Proposed work consists of (1) developing a two-stage optimized algorithm for the stochastic unit commitment and economic dispatch and pricing

56

Categorical Exclusion Determination Form Proposed Action Title: (0473-1510) Texas Engineering Experiment Station -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

rtm nt n rgy rtm nt n rgy Categorical Exclusion Determination Form Proposed Action Title: (0473-1510) Texas Engineering Experiment Station - Robust Adaptive Topology Control (RATC) Program or Pield Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Texas, Arizona, California, New Jersey, and Tennessee. Proposed Action Description: Funding will support development an algorithmic Topology Control software to enable real-time, automated control over the transmissions lines within the electricity grid during unexpected power supply interruptions caused by intermittent availability of renewable generation sources, and cascading network failures due to extreme operating conditions or malicious attacks. Proposed work consists of (1) developing a fast, adaptive topology control algorithm to identify actions that will mitigate effects of unexpected

57

Secretary Bodman Meets with Senators, Commits to Further Discussion of BPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Senators, Commits to Further Discussion Senators, Commits to Further Discussion of BPA Debt Prepayment Proposal Secretary Bodman Meets with Senators, Commits to Further Discussion of BPA Debt Prepayment Proposal February 16, 2006 - 11:57am Addthis WASHINGTON, DC - Secretary of Energy Samuel W. Bodman, in a meeting today with Pacific Northwest Senators hosted by Senator Larry Craig, committed to continue discussions with Pacific Northwest interests concerning the Bonneville Power Administration (BPA) debt prepayment proposal included in President Bush's FY 2007 Budget Request. "It was helpful for me to hear the perspectives of this bipartisan group of Pacific Northwest Senators, and to hear their views about the proposal in the President's budget request," Secretary Bodman said. "However, I

58

Environmental Assessment of Proposed Filbert Substation and Tap Project.  

SciTech Connect

The proposal is a cooperative (jointly funded and owned) action between Bonneville Power Administration (BPS) and FGLandP involving construction of the 115/12.5-kV Filbert Substation. BPA would also build a 0.8-mile overhead 115-kV tapline from BPA's Forest Grove-McMinnville 115-kV line to the proposed substation. The Forest Grove-McMinnville transmission line has available capacity to support the proposed substation. The FGLandP would build four underground distribution circuits to connect the substation to its existing distribution system. It is normally BPA's practice to consider several substation location alternatives as a part of its facility siting process. The proposed substation site was recommended after a preliminary field evaluation by BPA determined that building on the proposed site was preferable because available sites south of the Tualatin Valley Highway and Southern Pacific Railroad were either on presently cultivated farmland, were in a floodplain, or were inaccessible without extensive access road construction. The proposed substation site is owned by FGLandP, is designated for use as a utility substation in the Forest Grove Comprehensive Plan, and was purchased by FGLandP in anticipation of a need for its use as a substation site because of its central location in relation to existing and forecasted loads. The site is accessible from Filbert Street (city road), and is gently sloping. This report describes potential environmental impacts of the proposed actions.

United States. Bonneville Power Administration.

1984-03-01T23:59:59.000Z

59

Categorical Exclusion Determination Form Proposed Action Title: (0471-1606) United Technologies Research Center -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

rg rg Categorical Exclusion Determination Form Proposed Action Title: (0471-1606) United Technologies Research Center - Thermal Storage Using Hybrid Vapor Compression Adsorption System Program or Field Office: Advanced Research Projects Agency - Energy Location{s) (City/County/State): Connecticut, Michigan Proposed Action Description: Funding will support development of an advanced climate control system for plug-in hybrid electric vehicles (PHEVs) and electric vehicles (EVs) utilizing a hybrid thermal battery that employs a unique approach of adsorbing refrigerant on a metal salt. Proposed work consists of indoor laboratory-based research and development and office-based engineering analysis, including (1) synthesis, characterization, and testing of metal salts and refrigerant fluids for use in the thermal battery system, (2) computer-based design and

60

Categorical Exclusion Determination Form Proposed Action Title: (0672-1502) General Electric Global Research (GE) -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'Department of Energy 'Department of Energy Categorical Exclusion Determination Form Proposed Action Title: (0672-1502) General Electric Global Research (GE) - Chilled Natural Gas for At-Home Refueling Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Niskayuna, NY; Troy, NY; Columbia, MO Proposed Action Description: Funding will support efforts to develop a compressor technology for at-home refueling of natural gas vehicles. Proposed work will consist of: (1) development, synthesis, and testing of small quantities of adsorbent material at a dedicated laboratory facility on the University of Missouri campus in Columbia, MO; (2) design, fabrication (or procurement), and testing of compressor system components, including a cryocooler and an accumulator, at Chart Industries, Inc.'s commercial development and assembly site in Troy, NY; and (3) assembly

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Categorical Exclusion (CX) Determination Proposed Action: Expansion of O'Fallon Creek Substation Yard  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Expansion of O'Fallon Creek Substation Yard Expansion of O'Fallon Creek Substation Yard Description of Proposed Action: The Western Area Power Administration (Western) is proposing to expand the current yard to accommodate an additional bay for a dedicated electrical feed to a future oil pumping station that will be part of the Keystone XL project. Number and Title of Categorical Exclusions Being Applied: 10 CFR 10210410 Subpmi D, Appendix B, B4.11: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with the Regulatory Requirements for the National Environmental Policy Act at 10 CFR 1021AI0(b), require the following determinations be made in order for a proposed action to be categorically

62

Categorical Exclusion Determination Form Proposed Action Title: (0473-1621) Autogrid, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

partment n rgy partment n rgy Categorical Exclusion Determination Form Proposed Action Title: (0473-1621) Autogrid, Inc. - Highly Dispatchable and Distributed Demand Response for the Integration of Distributed Generation Program or Field Office: Advanced Research Projects Agency - Energy Location{s) (City/County/State): California and New York Proposed Action Description: Funding will support development a highly distributed Demand Response Optimization and Management System for Real-time (DROMS-RT) power flow control software to support large scale integration of distributed renewable generation sources into the electricity grid. Proposed work consists of (1) developing a web-based software platform to enable full DROMS-RT functionality; (2) developing standards for

63

Categorical Exclusion Determination Form Proposed Action Title: (0474-1528) Ideal Power Converters Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

rgy rgy ·Submitby£-mail Categorical Exclusion Determination Form Proposed Action Title: (0474-1528) Ideal Power Converters Inc. - Dual Bi-Directional Silicon IGBTs Modules Enables Breakthrough PV Inverter Using Current-Modulation Topology Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCitY/County/State): California, New York, Virginia, Texas Proposed Action Description: Funding will support development of a low-cost, high-efficiency 100 kW power inverter to connect photovoltaic (PV) solar panels to the grid, using revolutionary bi-directiona linsulated gate bipolar transistor (BD-IGBT) switches and dual chip modules. Proposed work consists of indoor laboratory-based research and development (R&D) and semiconductor fabrication, including (1) device

64

Categorical Exclusion Determination Form Proposed Action Title: (0473-1579) GE Global Research -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

partment of n rgy partment of n rgy Categorical Exclusion Determination Form Proposed Action Title: (0473-1579) GE Global Research - Nanoclay-reinforced Ethylene-Propylene-Rubber for Low Cost HVDC Cabling Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) (City/County/State): Niskayuna, NY Proposed Action Description: Funding will support development of a low cost, extrudable, nanoclay-reinforced ethylene-propylene-rubber (EPR) for making high voltage direct current (HVDC) cable. Proposed work will consist of (1) indoor, laboratory-based synthesis, characterization, and testing of nanoclay-reinforced EPR and (2) computer- based modeling of the performance characteristics and production cost of the nanoclay-reinforced EPR HVDC cable at full scale.

65

Categorical Exclusion Determination Form Proposed Action Title: (0471-1554) Pacific Northwest National Laboratory -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

partme t nerg partme t nerg Categorical Exclusion Determination Form Proposed Action Title: (0471-1554) Pacific Northwest National Laboratory - Reversible Metal Hydride Thermal Storage for High Temeprative Power Generation Systems Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Utah and Washington Proposed Action Description: Funding will support development of a novel, metal hydride-based thermal energy storage (TES) system for use with concentrated solar power or nuclear power generating systems. Proposed work consists of indoor laboratory-based research and development, including (1) materials synthesis, characterization, and testing to develop and optimize reversible metal hydride materials, (2) design and fabrication of a bench-scale 3kWh prototype TES unit, and (3) testing,

66

Categorical Exclusion Determination Form Proposed Action Title: (0473-1543) Georgia Tech Research Corporation-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-1543) Georgia Tech Research Corporation- 3-1543) Georgia Tech Research Corporation- Prosumer-Based Distributed Autonomous Cyber-Physical Architecture for Ultra-Reliable Green Electricity Internetworks Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Georgia Proposed Action Description: Funding will support development of an internet-like software architecture capable of independently controlling and coordinating distributed energy sources generated by "prosumers," such as wind and solar power, to improve the reliability, efficiency, flexibility, and communications within the electrical grid. Proposed work consists of (1) developing an independently networked inverter controller that incorporates Kuramoto oscillators to reduce required

67

Categorical Exclusion Determination Form Proposed Action Title: (0470-1541) Chromatin Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41) Chromatin Inc. - 41) Chromatin Inc. - Plant Based Sesquiterpene Biofuels Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Kansas, Kentucky, Illinois, Ohio Proposed Action Description: Funding will support development of genetically modified (GM) sweet sorghum (Sorghum bicolor) to produce increased levels of farnesene , a drop-in biofuel. Proposed work will consist of (1) transforming sweet sorghum with mini-chromosomes carrying limiting genes and metabolic pathway genes to increase farnesene synthesis; (2) evaluating and optimizing genes from plants, E. coli, and yeast (Saccharomyces cerevisiae) to improve enzymatic activity and specificity; (3) testing plasmid constructs and evaluating optimized genes in a model plant, guayule

68

Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action  

SciTech Connect

This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

Not Available

1993-12-01T23:59:59.000Z

69

Categorical Exclusion Determination Form Proposed Action Title: (0675-1511) Ford Motor Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11) Ford Motor Company - 11) Ford Motor Company - High Precision Tester for Automotive and Stationary Batteries Program or Field Office:Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Dearborn, MI; Albuquerque, NM; College Station, TX Proposed Action Description: Funding will support efforts to develop a high precision battery tester to measure key battery characteristics during charge/discharge cycles to improve the accuracy and precision of Columbic Efficiency and predicted life expectancy estimates. Proposed work will consist of: (1) development and validation of a low current battery tester that meets established performance objectives and (2) development and validation a high current battery tester that meets established performance objectives.

70

EIS-0425: Record of Decision and Mitigation Action Plan | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

5: Record of Decision and Mitigation Action Plan 5: Record of Decision and Mitigation Action Plan EIS-0425: Record of Decision and Mitigation Action Plan Bonneville Power Administration Record of Decision and Mitigation Action Plan for the Mid-Columbia Restoration Project BPA decided to implement the Proposed Action of the Mid-Columbia Coho Restoration Program as described in the Mid-Columbia Coho Restoration Program Final Environmental Impact Statement (EIS) (DOE/EIS-0425, March 2012). BPA will fund the construction, operation, and maintenance of a coho slamon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action will involve building a new, small, in-basin adult

71

TEPS/BPA Information | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

TEPS/BPA Information | National Nuclear Security Administration TEPS/BPA Information | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog TEPS/BPA Information Home > About Us > Our Operations > Acquisition and Project Management > Technical, Engineering, and Programmatic Support (TEPS) Blanket Purchase Agreements (BPAs) > TEPS/BPA Information

72

Microsoft Word - PSRP May 15 2009 _BPA_ Final.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

come from renewable, non-carbon-emitting generation. BPA also has completed asset management studies of needed capital upgrades and replacements for its aging transmission...

73

GNA Cliffs BPA Record of Decision (9/13/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATOR'S RECORD OF DECISION ADMINISTRATOR'S RECORD OF DECISION GNA Cliffs Energy Project Record of Decision INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for integrating power from GNA Energy, LLC, (GNA)-a 300-megawatt (MW) natural-gas-fired, combined- cycle, combustion-turbine power generation project-into the Federal Columbia River Transmission System (FCRTS). This project, the Cliffs Energy Project (CE Project), is 0.5 miles west of the Goldendale Aluminum Company aluminum smelter just off State Route 14 in Klickitat County, Washington. It is one of many proposed generation projects currently being considered for integration into the FCRTS. Power generated at the CE Project will be available for purchase in the wholesale power market.

74

Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appliance Appliance Standards Program The FY 2003 Priority- Setting Summary Report and Actions Proposed Date: August 22, 2002 Table of Contents i EXECUTIVE SUMMARY.............................................................................................. iv 1 Energy Conservation Program - Product Prioritization Process.......1-1 1.1 Background on Appliance Standards Program........................................... 1-1 1.2 DOE Authority to Add Products ................................................................ 1-2 1.2.1 Consumer Products .................................................................................... 1-3 1.2.2 Commercial Products................................................................................. 1-5 1.2.2.1 Products Regulated under EPCA Provisions Concerning Consumer

75

Final Environmental Assessment BPA's Hot Springs - Garrison  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BPA's Hot Springs - Garrison Fiber Optic Project DOE-EA-1 002 POWER ADMINISTRATION Bonneville Power Administration DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsi- bility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Refer- ence herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recom-

76

Categorical Exclusion Determination Form Proposed Action Title: (0474-1592) Satcon Technology Corp. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-1592) Satcon Technology Corp. - 4-1592) Satcon Technology Corp. - Agile Direct Grid Connect Medium Voltage 4.7-13.8kV Power Converter for PV Applications Utilizing Advanced Wide Band Gap Devices Program or Field Office:Advanced Research Projects Agency - Energy Location{s) (City/County/State): Massachusetts, New Mexico, North Carolina, Pennsylvania Proposed Action Description: Funding will support development of an early stage prototype of a solid-state power inverter capable of converting low-voltage input power generated by utility-scale solar farms to medium voltage AC output power for transmission to the electric grid, increasing energy yield and reducing equipment costs. Proposed work consists of indoor laboratory-based research and development (R&D) and device testing, including (1) design, fabrication, and

77

Categorical Exclusion Determination Form Proposed Action Title: (0675-1570) Washington University in St. Louis -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0) Washington University in St. Louis - 0) Washington University in St. Louis - Optimal Operation and Management of Energy Storage Systems Based on Real-Time Predictive Modeling and Adaptive Battery Management Techniques Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): St. Louis, MO; Golden, CO Proposed Action Description: Funding will support efforts to develop a battery management system for electric vehicle batteries capable of accurately predicting a battery's charge and health in order to make control decisions that improve battery safety, charging rate, useful capacity, and battery lifetime. Proposed work will consist of: (1) development of baseline physics models for the battery management; (2) optimization of the baseline physics

78

Categorical Exclusion Determination Form Proposed Action Title: (0470-1532) Arcadia Biosciences, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32) Arcadia Biosciences, Inc. - 32) Arcadia Biosciences, Inc. - Vegetative Production of Oil in a C4 Crop Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Davis, CA Proposed Action Description: Funding will support development of genetically modified (GM) Setaria viridis (Setaria) that produces triacylglycerol (vegetable oil) in the tissues of I. the plant in place of starch. If the work performed under the award is successful, Arcadia will incorporate the gene combinations developed in _ Setaria into sorghum. Proposed work will consist of laboratory-based (1) genetic modification of E. coli to construct vectors for implementing oil production genes in Setaria; (2) genetic modification of Setaria to express gene combinations for three different pathways that are critical to oil synthesis; and (3)

79

Categorical Exclusion Determination Form Proposed Action Title: (0473-1597) Smart Wire Grid, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

97) Smart Wire Grid, Inc. - 97) Smart Wire Grid, Inc. - Distributed Power Flow Contro l Using Smart Wires for Energy Routing Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): California, Missouri, North Carolina, Georgia, Wash ington, Pennsylvania, and Tennessee Proposed Action Description: Funding will support development of a Smart Wire System Controller and an energy router software to enable distributed agents to coordinate with the control center, improve power flow control, and take advantage of unused capacity within the existing transmission system. In addition, the power controller will enable grid operators to optimize transmission assets to fully integrate variable renewable energy sources. Proposed work consists of (1) designing, developing, testing, and optimizing the Smart Wire System Controller to meet utility specifications; (2)

80

Categorical Exclusion Determination Form Proposed Action Title: (0674-1585) Xilectric, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

585) Xilectric, Inc. - 585) Xilectric, Inc. - Low Cost Transportation Batteries Program or Field Office: Advanced Research Projects Agency - Energy (ARPA-E) LocationCs) CCity/County/State): University of Rhode Island (Kingston, RI); Electrosynthesis, Inc. (Lancaster, NY) Proposed Action Description: Submit by E-mail JI Funding will support efforts to develop a new class of low-cost rechargeable battery chemistries based on the Edison battery chemistry that have the potential to exceed energy densities of 400 Wh/kg and 600 Wh/L at a battery materials cost less than $50/kWh. These battery systems will be built from materials that are earth-abundant, environmentally friendly, and cheap with a cell architecture that is inexpensive to manufacture and electrode structures expected to have extremely long cycle life. Proposed work will consist of: (1) testing, thermodynamic characterization, and

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Proposed Action Title: (0470-1517) Donald Danforth Plant Science Center -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(0470-1517) Donald Danforth Plant Science Center - (0470-1517) Donald Danforth Plant Science Center - Center for Enahnced Camelina Oil Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Michigan, Missouri, Montana, Nebraska, New Mexico Proposed Action Description: Funding will support development of genetically modified (GM) camelina that grows at an increased yield and produces more seed oil than wild- type camelina for use as a biofuel feedstock. Proposed work will consist of (1) genetically modifying camelina to improve carbon capturel assimilation and light utilization, and to redirect carbon flux towards seed oil synthesis, including synthesis of oleic acid; (2) fabricating and testing phenomics chambers used to analyze plant metabolism under varying conditions (e.g. humidity, temperature); (3) growing selected lines of non-GM, wild-type camelina in contained

82

Categorical Exclusion Determination Form Proposed Action Title: (0473-1520) Michigan State Un  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-1520) Michigan State Un 3-1520) Michigan State Un iversity - Transformer-less Unified Power Flow Controller for Wind and Solar Power Transmission Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): East Lansing, MI Proposed Action Description: Funding will support the development of a transformer-less unified power flow controller (UPFC) that can efficiently and economically control distributed and intermittent power flow generated by wind and solar power sources through existing transmission lines. Proposed work will consist of indoor activities to (1) engage in a system-level simulation of the new UPFC with a real-time simulator; (2) design, develop , and electronically fabricate three prototype 15-kV/1.5-MVA transformer-less UPFCs; (3) construct a temporary, 15-kV mobile testing

83

Categorical Exclusion Determination Form Proposed Action Title: (0208-1695) Sustainable Energy Solutions LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

208-1695) Sustainable Energy Solutions LLC - 208-1695) Sustainable Energy Solutions LLC - Cryogenic Carbon Capture (Phase 2) Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Utah; Wyoming Proposed Action Description: Funding will support development of a cryogenic carbon capture (CCC) process for separating carbon dioxide from flue gas via desublimination of the flue gas and compression of the resulting solid and liquid products. Proposed work will consist of (1) design, fabrication/acquisition, and testing of components for the pilot-scale prototype CCC system; (2) integration of the components into a skid-mounted, pilot-scale prototype CCC system; and (3) testing of the skid-mounted, pilot-scale prototype CCC system using actual or simulated flue gas streams.

84

Categorical Exclusion Determination Form Proposed Action Title: (0675-1534) GE Global Research -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

34) GE Global Research - 34) GE Global Research - Control Enabling Solutions with Ultrathin Strain and Temperature Sensor System for Reduced Battery Life Cycle Cost Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Niskayuna, NY; Ann Arbor, MI; Dearborn, MI Proposed Action Description: Funding will support efforts to develop a a novel sensor system with supporting multi-physics models to increase battery cell lifetime and extend battery range for electric vehicle applications. Proposed work will consist of: (1) development and fabrication a novel multi-measurand sensor capable of measuring strain and temperature across multiple battery cells; (2) performance of strain and temperature testing and development and validation of multi-physics models; (3)

85

Categorical Exclusion Determination Form Proposed Action Title: (0473-1529) Charles River Associates International Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29) Charles River Associates International Inc. - 29) Charles River Associates International Inc. - Transmission Topology Control for Infrastructure Resilience to the Integration of Renewable Generation Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Massachusetts, Pennsylvania, Washington Proposed Action Description: Funding will support development of Topology Control, an algorithmic and software technology framework that will improve the efficiency of the electrical grid by implementing appropriate short-term changes of transmission line status to manage transmission congestion and uncertainties associated with integration of renewable generation sources into the electricity grid. Proposed work consists of (1) developing and validating a large power system model that accurately simulates day-ahead and intra-day power

86

Categorical Exclusion Determination Form Proposed Action Title: (0675-1578) Robert Bosch LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8) Robert Bosch LLC - 8) Robert Bosch LLC - Advanced Battery Management System Program or Field Office: Advanced Research Projects Agency - Energy (ARPA-E) LocationCs) CCity/County/State): Bosch RTC (Palo Alto, CA); Cobasys, LLC (Orion, MI); University of California - San Diego (San Diego, CA) Proposed Action Description: Funding will support efforts to develop an adaptive battery management system that controls battery charging and discharging so as to enable fuller, more efficient battery utilization . Proposed work will consist of: (1 ) development of real-time estimation and control strategies for estimating battery performance; (2) design , development, and fabrication of small-scale Lithium-ion battery cells with an electrochemical-based battery management system; and (3) conducting analytical modeling and testing to characterize and validate system performance.

87

Categorical Exclusion Determination Form Proposed Action Title: (0674-1610) TVN Systems, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

610) TVN Systems, Inc. - 610) TVN Systems, Inc. - Hydrogen/Bromine Electrical Energy Storage System Program or Field Office :Advanced Research Projects Agency - Energy (ARPA-E) Submit by E-mail LocationCs) CCity/County/State): TVN Systems, Inc. (Lawrence, KS); Vanderbilt University (Nashville, TN); University of Kansas (Lawrence, KS) Proposed Action Description: Funding will support efforts to develop a cost-effective hydrogen-bromine flow battery that utilizes advanced membrane materials, unique catalysts, a novel shunt current protection system , and advanced cell and system designs. Proposed work will consist of: (1) synthesizing active and stable Rhodium-sulfer based electro-catalytic materials for hydrogen reactions; (2) fabricating and testing nanofiber composite membranes;

88

Executive Director for Operations /RA/ SUBJECT: PROPOSED RULEMAKING—POST-FIRE OPERATOR MANUAL ACTIONS (RIN 3150  

E-Print Network (OSTI)

To obtain Commission approval to publish the proposed rule, including the issue of the need for an interim enforcement discretion policy and make available the draft regulatory guide and other supporting documents for public comment. BACKGROUND: In SECY-03-0100, “Rulemaking Plan on Post-Fire Operator Manual Actions, ” dated June 17, 2003, the staff recommended revising the existing fire protection regulation in paragraph III.G.2 of Appendix R to 10 CFR Part 50 to include operator manual actions. These actions are needed to ensure that a redundant train of systems necessary to achieve and maintain hot shutdown conditions located within the same area outside the primary containment is free of fire damage. In an SRM dated September 12, 2003, the Commission approved the staff’s recommendation to revise the fire protection program requirements in Appendix R and the associated guidance. The Commission also approved the staff’s plan to develop an interim enforcement policy to deal with compliance issues until the guidance and final rule are implemented. CONTACT:

Luis A. Reyes; David Diec Nrr/drip

2004-01-01T23:59:59.000Z

89

Categorical Exclusion Determination Form Proposed Action Title: (0472-1537) Northeastern University -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37) Northeastern University - 37) Northeastern University - Multiscale Development of L 10 Materials for Rare-Earth-Free Permanent Magnets Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): New York, Michigan, Massachusetts, and Nebraska. Proposed Action Description: Funding will support the development of an ultra-strong ferromagnetic magnet material with a tetragonal L 10 structure, that does not contain rare earth materials and is designed for use in clean energy technologies such as electric vehicle motors and wind turbine generators. Northeastern University's application was selected for an initial 18-month period (Phase 1) of funding. The ARPA-E Program Director may decide to negotiate and fund project activities for an additional 18-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated

90

Categorical Exclusion Determination Form Proposed Action Title: (0472-1518) Case Western Reserve University -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18) Case Western Reserve University - 18) Case Western Reserve University - Transformation Enabled Nitride Magnets Absent Rare Earths Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Cleveland, OH Proposed Action Description: Funding will support the development of iron nitride (a"-Fe16(xx)N2) bulk powder capable of replacing rare earth elements in permanent magnets that are used in wind turbine generators and electric vehicle motors. Case Western Reserve University's application was selected for an initial 18- month period (Phase 1) of funding . The ARPA-E Program Director may decide to negotiate and fund project activities for an additional 18-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated funds or negotiated a scope of work for Phase II at

91

Categorical Exclusion Determination Form Proposed Action Title: (0472-1545) Dartmouth College -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

45) Dartmouth College - 45) Dartmouth College - Nanocrystalline T-MnAI Permanent Magnets Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Hanover, NH Proposed Action Description: Funding will support the development of manganese-aluminum (T-MnAI) bulk powder capable of replacing rare earth elements in permanent magnets that are used in wind turbine generators and electric vehicle motors. Dartmouth College's application was selected for an initial 18- month period (Phase 1) of funding. The ARPA-E Program Director may decide to negotiate and fund project activities for an additional H3-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated funds or negotiated a scope of work for Phase II at

92

Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments - Chapter 2 Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

2-1 2-1 CHAPTER 2 PROPOSED ACTION AND ALTERNATIVES Some types of experiments are best (or only) performed deep underground. For this reason, scientists have considered WIPP as a potential site for these types of experiments and have sought permission from DOE to conduct several types of experiments there. As an example, astrophysicists are searching for very small particles with no charge called neutrinos. These particles are so small that they typically pass through the Earth. The only way to detect them is to look for them using facilities as far underground as possible so that the Earth's surface layers filter out other cosmic particles and radiation. The first basic astrophysics-like experiments were begun at WIPP in 1993 by LANL scientists who used

93

Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S-1 Summary This summary covers the major points of the draft environmental impact statement (DEIS) prepared for the Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project (Libby-Troy Project). This DEIS was prepared by Bonneville Power Administration (BPA). The project would include rebuilding a 17-mile section of an existing BPA transmission line located between Libby and Troy, Montana. S.1 Purpose of and Need for Action Historically, BPA has served electrical loads in northwestern Montana and northern Idaho with transmission facilities from Libby Dam east of Libby, Montana through Bonners Ferry Substation west of Bonners Ferry, Idaho to Albeni Falls Dam near the Idaho-Washington border (Figure S-1). These

94

To: ALLBPA Subject: Administrator Update Fellow BPA Employees,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26, 2013 8:38 AM 26, 2013 8:38 AM To: ALLBPA Subject: Administrator Update Fellow BPA Employees, I would like to thank you again for your commitment to your work and to our mission over the past few weeks. My purpose in communicating with you today is to reiterate the key messages I have been sharing with BPA's leadership team. At the moment, I am laser focused on three fundamental objectives: * Remain committed to our mission and our customers; * Take care of our workforce; * Actively address the issues related to how we execute our human resources activities and make sure that all BPA employees are aware of BPA's absolute commitment to a workplace free of retaliation,

95

Microsoft Word - PSRP May 15 2009 _BPA_ Final.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Specific Recovery Plan (PSRP) Name: Bonneville Power Administration (BPA) Program Specific Recovery Plan (PSRP) Name: Bonneville Power Administration (BPA) Borrowing Authority ($3.25B) PSRP Lead Program Office and/or Laboratory/Site Office: Bonneville Power Administration PSRP Lead Manager: Nancy Mitman phone: (503) 230 3998 e-mail: nmmitman@bpa.gov address: Bonneville Power Administration Data Call 8 Program-Specific Recovery Plan (PSRP) Template NEW TEMPLATE for Recovery Program Plans (RPPs) based on updated OMB guidance Does this program align with an existing PART program? Y/N Yes Does this program align with an existing CFDA program? Y/N No If it does not correspond to existing PART or CFDA please enter in Program Title Will align with BPA's actual PART program name. 1. Objectives:

96

Radon Monitoring Results BPA Residential Weatherization Program, Report Number 1.  

SciTech Connect

In October 1984, the Bonneville Power Administration (BPA) began offering free radon monitoring to participants of its regionwide Residential Weatherization Program. The purpose of the radon monitoring is to provide information to participating homeowners or consumers on the average radon concentrations within their residences. This radon concentration information and other information on indoor air quality (IAQ) is provided to assist homeowners on their decision to install ''house-tightening'' weatherization measures. This radon report will present background information on why BPA decided to offer radon monitoring, the procedures used for monitoring, the extent of BPA radon monitoring in the region, and results of this monitoring. Subsequent BPA radon monitoring reports will be produced on a quarterly basis which will include a brief narrative on the radon monitoring and provide a summary of the radon data received to date.

United States. Bonneville Power Administration.

1986-01-01T23:59:59.000Z

97

BPA FINAL Binding Arbitration policy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BPA FINAL Binding Arbitration policy BPA FINAL Binding Arbitration policy BPA FINAL Binding Arbitration policy Alternative dispute resolution (ADR) encompasses a variety of methods that parties may use to resolve disputes without litigation. Arbitration is a private, less formal process in which parties agree to submit a dispute to one or more impartial arbitrators who then render a decision or award. In non-binding arbitration a party is not required to accept the arbitrator's decision. In contrast, a decision or award in binding arbitration is final and subject to only very limited rights of appeal. See Federal Arbitration Act, 9 U.S.C. §§ 1-16 (FAA). Both types of arbitration can provide benefits to BPA, its customers, and other stakeholders including the public, such as greater flexibility, limited

98

BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.  

SciTech Connect

BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

United States. Bonneville Power Administration.

1995-04-01T23:59:59.000Z

99

FIA-12-0013 - In the Matter of Another Way BPA | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 - In the Matter of Another Way BPA 3 - In the Matter of Another Way BPA FIA-12-0013 - In the Matter of Another Way BPA OHA issued a decision denying FOIA Appeals filed by Another Way BPA, relating to a request which it filed for records regarding the I-5 Corridor Reinforcement Project. In March 2012, the DOE's Bonneville Power Administration issued three determinations in response to Another Way BPA's requests. In the determinations, BPA indicated that it located some documents responsive to Another Way BPA's requests and released the documents with information withheld pursuant to FOIA Exemptions 5 and 6. Another Way BPA appealed each determination, challenging the adequacy of BPA's searches, and the applicability of Exemption 5. On appeal, OHA determined that, although BPA's searches did not yield the volume of

100

FIA-12-0014 - In the Matter of Another Way BPA | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 - In the Matter of Another Way BPA 4 - In the Matter of Another Way BPA FIA-12-0014 - In the Matter of Another Way BPA OHA issued a decision denying FOIA Appeals filed by Another Way BPA, relating to a request which it filed for records regarding the I-5 Corridor Reinforcement Project. In March 2012, the DOE's Bonneville Power Administration issued three determinations in response to Another Way BPA's requests. In the determinations, BPA indicated that it located some documents responsive to Another Way BPA's requests and released the documents with information withheld pursuant to FOIA Exemptions 5 and 6. Another Way BPA appealed each determination, challenging the adequacy of BPA's searches, and the applicability of Exemption 5. On appeal, OHA determined that, although BPA's searches did not yield the volume of

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

FIA-12-0012 - In the Matter of Another Way BPA | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 - In the Matter of Another Way BPA 2 - In the Matter of Another Way BPA FIA-12-0012 - In the Matter of Another Way BPA OHA issued a decision denying FOIA Appeals filed by Another Way BPA, relating to a request which it filed for records regarding the I-5 Corridor Reinforcement Project. In March 2012, the DOE's Bonneville Power Administration issued three determinations in response to Another Way BPA's requests. In the determinations, BPA indicated that it located some documents responsive to Another Way BPA's requests and released the documents with information withheld pursuant to FOIA Exemptions 5 and 6. Another Way BPA appealed each determination, challenging the adequacy of BPA's searches, and the applicability of Exemption 5. On appeal, OHA determined that, although BPA's searches did not yield the volume of

102

Finding of no significant impact proposed corrective action for the Northeast Site at the Pinellas Plant in Largo, Florida  

SciTech Connect

The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) (DOE/EA-0976) of the proposed corrective action for the Northeast Site at the Pinellas Plant in Largo, Florida. The Northeast Site contains contaminated groundwater that would be removed, treated, and discharged to the Pinellas County Sewer System. Based on the analyses in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 U.S.C.4321 et.seq. Therefore, the preparation of an environmental impact statement is not required and the DOE is issuing this Finding of No Significant Impact (FONSI).

NONE

1995-06-01T23:59:59.000Z

103

Secretary Chu Announces Progress on BPA Recovery Act Project | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Progress on BPA Recovery Act Project Progress on BPA Recovery Act Project Secretary Chu Announces Progress on BPA Recovery Act Project August 10, 2009 - 12:00am Addthis Richland, Wash. - With the goal of bringing new jobs and green power to the West, Energy Secretary Steven Chu today announced the start of the McNary-John Day transmission project in Washington and Oregon, which will be funded by $343 million from the American Recovery and Reinvestment Act. The project is expected to deliver almost 600 megawatts of clean, renewable wind energy to homes and business across the West. "These Recovery Act funds are putting people to work today to build the infrastructure that will be vital to our economy in the future," said U.S. Energy Secretary Steven Chu. "By integrating renewable energy sources onto

104

BPA experience in the direct measurement of power system dynamics  

Science Conference Proceedings (OSTI)

Sustained growth of a large power system tends to make the model-based planning of system expansions and operations increasingly difficult. This paper presents a BPA perspective on procedures for extracting supplemental information for the power system itself. These procedures involve disturbance analysis, ambient measurements, and direct tests. Results shown for the western U.S. power system include a response model derived from a recent test energization of BPA's 1400 MW dynamic brake. The model construction illustrated combined use of Fourier analysis, Prony analysis, and optimal fitting to measured frequency response.

Hauer, J.F. (Bonneville Power Administration, Portland, OR (United States))

1990-01-01T23:59:59.000Z

105

BPA Turns 75: A Look Back and a Look Ahead | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BPA Turns 75: A Look Back and a Look Ahead BPA Turns 75: A Look Back and a Look Ahead BPA Turns 75: A Look Back and a Look Ahead September 28, 2012 - 11:59am Addthis To commemorate what BPA considers a 75-year partnership with the Columbia River, which is the cornerstone of BPA's relationship with the people and utilities of the Northwest, BPA releases the first video of a series detailing its history. Teresa Waugh Public Affairs Specialist, Bonneville Power Administration What is BPA? BPA markets wholesale electrical power from 31 federal hydro projects in the Columbia River Basin in the Pacific Northwest. BPA's service territory includes Idaho, Oregon, Washington, western Montana and small parts of eastern Montana, California, Nevada, Utah and Wyoming. Seventy five years ago last month, Franklin D. Roosevelt signed the

106

Assessment of the Geothermal Potential Within the BPA Marketing Area.  

DOE Green Energy (OSTI)

The potential of geothermal energy is estimated that can be used for direct heat applications and electrical power generation within the Bonneville Power Administration (BPA) marketing area. The BPA marketing area includes three principal states of Oregon, Washington, and Idaho and portions of California, Montana, Wyoming, Nevada, and Utah bordering on these three states. This area covers approximately 384,000 square miles and has an estimated population of 6,760,000. The total electrical geothermal potential within this marketing area is 4077 MW/sub e/ from hydrothermal resources and 16,000 MW/sub e/ from igneous systems, whereas the total thermal (wellhead) potential is 16.15 x 10/sup 15/ Btu/y. Approximately 200 geothermal resource sites were initially identified within the BPA marketing area. This number was then reduced to about 100 sites thought to be the most promising for development by the year 2000. These 100 sites, due to load area overlap, were grouped into 53 composite sites; 21-3/4 within BPA preference customer areas and 31-1/4 within nonpreference customer areas. The geothermal resource potential was then estimated for high-temperature (> 302/sup 0/F = 150/sup 0/C), intermediate-temperature (194 to 302/sup 0/F = 90 to 150/sup 0/C), and low-temperature (< 194/sup 0/F = 90/sup 0/C) resources.

Lund, John W.; Allen, Eliot D.

1980-07-01T23:59:59.000Z

107

US Department of Energy response to standards for remedial actions at inactive uranium processing sites: Proposed rule  

Science Conference Proceedings (OSTI)

The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all Title I sites. On September 24, 1987, the EPA published proposed standards (52FR36000-36008) in response to the remand. This report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project, as well as a discussion of the DOE's position on the proposed standards. The report also contains and appendix which provides supporting information and cost analyses. In order to assess the impacts of the proposed EPA standards, this report summarizes the proposed EPA standards in Section 2.0. The next three sections assess the impacts of the three parts of the EPA standards: Subpart A considers disposal sites; Subpart B is concerned with restoration at processing sites; and Subpart C addresses supplemental standards. Section 6.0 integrates previous sections into a recommendations section. Section 7.0 contains the DOE response to questions posed by the EPA in the preamble to the proposed standards. 6 refs., 5 figs., 3 tabs.

Not Available

1988-01-29T23:59:59.000Z

108

12-10-09_Final_Testimony_(Mainzer)_(BPA).pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATEMENT OF STATEMENT OF ELLIOT MAINZER EXECUTIVE VICE PRESIDENT CORPORATE STRATEGY BONNEVILLE POWER ADMINISTRATION UNITED STATES DEPARTMENT OF ENERGY BEFORE THE COMMITTEE ON ENERGY AND NATURAL RESOURCES UNITED STATES SENATE HEARING ON THE ROLE OF GRID-SCALE ENERGY STORAGE IN MEETING OUR ENERGY AND CLIMATE GOALS DECEMBER 10, 2009 Thank you, Mr. Chairman. My name is Elliot Mainzer and I am the Executive Vice President for Corporate Strategy for the Bonneville Power Administration (BPA). I am pleased to be here today to describe the significance of BPA's efforts to facilitate wind energy into the Western transmission system and the role storage technologies could play as one tool in the suite of initiatives we are developing to improve our ability to integrate

109

BPA GUIDANCE ON THE USE OF BINDING ARBITRATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION'S BONNEVILLE POWER ADMINISTRATION'S GUIDANCE ON THE USE OF BINDING ARBITRATION FOR BPA CONTRACTS Introduction Alternative dispute resolution (ADR) encompasses a variety of methods that parties may use to resolve disputes without litigation. Arbitration is a private, less formal process in which parties agree to submit a dispute to one or more impartial arbitrators who then render a decision or award. In non-binding arbitration a party is not required to accept the arbitrator's decision. In contrast, a decision or award in binding arbitration is final and subject to only very limited rights of appeal. See Federal Arbitration Act, 9 U.S.C. §§ 1-16 (FAA). Both types of arbitration can provide benefits to BPA, its customers, and other stakeholders including the public, such as greater flexibility, limited discovery, a

110

BPA GUIDANCE ON THE USE OF BINDING ARBITRATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION'S BONNEVILLE POWER ADMINISTRATION'S GUIDANCE ON THE USE OF BINDING ARBITRATION FOR BPA CONTRACTS Introduction Alternative dispute resolution (ADR) encompasses a variety of methods that parties may use to resolve disputes without litigation. Arbitration is a private, less formal process in which parties agree to submit a dispute to one or more impartial arbitrators who then render a decision or award. In non-binding arbitration a party is not required to accept the arbitrator's decision. In contrast, a decision or award in binding arbitration is final and subject to only very limited rights of appeal. See Federal Arbitration Act, 9 U.S.C. §§ 1-16 (FAA). Both types of arbitration can provide benefits to BPA, its customers, and other stakeholders including the public, such as greater flexibility, limited discovery, a

111

Notice of Proposed Floodplain and Wetlands Actions (DOE/EIS-0385) (03/28/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

398 Federal Register 398 Federal Register / Vol. 71, No. 59 / Tuesday, March 28, 2006 / Notices conditions that could result in an accidental or unauthorized detonation of nuclear explosives. Comments are invited on: (a) Whether the extended collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques

112

A model for determining when an analysis contains sufficient detail to provide adequate NEPA coverage for a proposed action  

SciTech Connect

Neither the National Environmental Policy Act (NEPA) nor its subsequent regulations provide substantive guidance for determining the Level of detail, discussion, and analysis that is sufficient to adequately cover a proposed action. Yet, decisionmakers are routinely confronted with the problem of making such determinations. Experience has shown that no two decisionmakers are Likely to completely agree on the amount of discussion that is sufficient to adequately cover a proposed action. one decisionmaker may determine that a certain Level of analysis is adequate, while another may conclude the exact opposite. Achieving a consensus within the agency and among the public can be problematic. Lacking definitive guidance, decisionmakers and critics alike may point to a universe of potential factors as the basis for defending their claim that an action is or is not adequately covered. Experience indicates that assertions are often based on ambiguous opinions that can be neither proved nor disproved. Lack of definitive guidance slows the decisionmaking process and can result in project delays. Furthermore, it can also Lead to inconsistencies in decisionmaking, inappropriate Levels of NEPA documentation, and increased risk of a project being challenged for inadequate coverage. A more systematic and less subjective approach for making such determinations is obviously needed. A paradigm for reducing the degree of subjectivity inherent in such decisions is presented in the following paper. The model is specifically designed to expedite the decisionmaking process by providing a systematic approach for making these determination. In many cases, agencies may find that using this model can reduce the analysis and size of NEPA documents.

Eccleston, C.H.

1994-11-01T23:59:59.000Z

113

BPA Wins Platts Global Energy Award for Grid Optimization | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BPA Wins Platts Global Energy Award for Grid Optimization BPA Wins Platts Global Energy Award for Grid Optimization BPA Wins Platts Global Energy Award for Grid Optimization December 18, 2013 - 2:25pm Addthis Platts awarded the Bonneville Power Administration (BPA) a Global Energy Award for grid optimization on December 12 in New York City for its development of a synchrophasor network. BPA is part of the Recovery Act-funded Western Interconnection Synchrophasor Program, in which 19 utilities have partnered with the Department of Energy to provide real-time visibility of the entire western power system that covers 14 states, two Canadian provinces and a portion of the Baja Peninsula in Mexico. Through a dedicated, secure network provided by Western Interconnection Synchrophasor Program, BPA is sharing synchrophasor data with 10 other utilities,

114

BPA Regional Science Bowl - High School Edition | U.S. DOE Office...  

Office of Science (SC) Website

Oregon Regions BPA Regional Science Bowl - High School Edition National Science Bowl (NSB) NSB Home About NSB High School High School Students High School Coaches High School...

115

BPA Regional Science Bowl | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Oregon Regions BPA Regional Science Bowl National Science Bowl (NSB) NSB Home About NSB High School Middle School Middle School Students Middle School Coaches Middle School...

116

Analysis of the methodology used to incorporate price-induced conservation into BPA's planning process  

Science Conference Proceedings (OSTI)

Bonneville Power Administration (BPA) is charged with the responsibility of planning how the electricity requirements of the BPA region may be met at a minimal cost. As part of this effort, electricity demand is forecast for the region over a twenty-year time horizon and the most efficient mix of resources that may be utilized to meet the forecasted electricity demand is determined by use of BPA's Least Cost Mix Model (LCMM). BPA considers conservation as a resource that may be utilized to meet future energy demand, and estimates supply curves for conservation which are sent to the LCMM.

Dinan, T.M.

1986-07-01T23:59:59.000Z

117

Superconducting magnetic energy storage for BPA transmission-line stabilization  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) operates the electrical transmission system that joins the Pacific Northwest with southern California. A 30 MJ (8.4 kWh) Superconducting Magnetic Energy Storage (SMES) unit with a 10 MW converter is being installed at the Tacoma Substation to provide system damping for low frequency oscillations of 0.35 Hz. The integrated system status is described and reviewed. Components included in the system are the superconducting coil, seismically mounted in an epoxy fiberglass nonconducting dewar; a helium refrigerator; a heat rejection subsystem; a high pressure gas recovery subsystem; a liquid nitrogen trailer; the converter with power transformers and switchgear; and a computer system for remote microwave link operation of the SMES unit.

Rogers, J.D.; Barron, M.H.; Boenig, H.J.; Criscuolo, A.L.; Dean, J.W.; Schermer, R.I.

1982-01-01T23:59:59.000Z

118

Microsoft Word - BPA_Creston_Bell_PrelimEA_04-06-12_Final[1].docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Creston-Bell Transmission Line Rebuild Project Preliminary Environmental Assessment April 2012 DOE/BP-4406 This page intentionally left blank. Bonneville Power Administration iii Table of Contents Chapter 1 Purpose of and Need for Action 1-1 1.1 Introduction ....................................................................................................... 1-1 1.2 Need for Action ................................................................................................. 1-1 1.3 Purposes of Action ............................................................................................ 1-3 1.4 Public Involvement ........................................................................................... 1-3 Chapter 2 Proposed Action and Alternatives 2-1

119

BPA-Solicited Technical Review of "Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline", Technical Report 2004.  

DOE Green Energy (OSTI)

The purpose of this report was to provide, at BPA's request, a technical review of interim products received for Project 2001-015-00 under contract 6925. BPA sometimes solicits technical reviews for Fish and Wildlife products or issues where outside expertise is required. External review of complex project deliverables assures BPA as a funding agency that the contractor is continuing with scientifically-credible experimental techniques envisioned in the original proposal. If the project's methodology proves feasible, there could be potential applications beyond the project area to similar situations in the Columbia Basin. The Experiment involves artificial flooding during high flow periods and a determination of the portion of the return flows that end up in the Umatilla River during low flow months and within acceptable water quality parameters (e.g., low temperature, few contaminants). Flooding could be a critical water source for aquatic organisms at times of the year when flows in the lower reaches of the Umatilla River are low and water is warmer than would be desired. The experiment was proposed to test whether 'this process, recharges the shallow aquifers of the old flood plain, for natural filtration through the alluvial soils as it returns to the Umatilla River, cleaner and cooler (about 50 degree Fahrenheit) five to six month later (about July and August) substantially cooling the river and [making it] more beneficial to anadromous [fish]'. A substantial amount of preliminary data had been collected and preliminary results were submitted in an interim report 'Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline (December 2002)'. A substantial amount of addition funding was provided for the last cycle of flooding (Phases II) and final analyses of the full compliment of data collected over the life of the contract (Phase III). Third party scientific review may assist the contractor in producing a higher quality Final Report with completion of the final 2 phases of the project.

Morgan, David

2004-02-01T23:59:59.000Z

120

Review of BPA Funded Sturgeon, Resident Fish and Wildlife Projects for 1990/1991.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) held a public meeting on November 19--21, 1991, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. This document list the projects by title, the project leaders and BPA's project officers, and an abstract of each leader's presentation.

United States. Bonneville Power Administration.

1990-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Charting a Course for the Future : BPA Programs in Perspectives, Technical Appendix.  

SciTech Connect

Programs in Perspective is the Bonneville Power Administration`s public involvement process for engaging customers and other stakeholders in a regional dialog to set strategic direction and broad program plans for BPA. This process leads into a biennial rate setting cycle and offers a more accessible and flexible opportunity for dialog on broad issues than is possible under the strict administrative procedures of ratemaking. The self-financed character of BPA has made this public process a necessary and valuable one to assure that those who play BPA`s rates have a clear understanding and a strong voice in the plans for use of the resulting revenues.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

122

BPA Regional High School Science Bowl | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Oregon Regions » BPA Regional High School Oregon Regions » BPA Regional High School Science Bowl National Science Bowl® (NSB) NSB Home About High School High School Students High School Coaches High School Regionals High School Rules, Forms, and Resources Middle School Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov Oregon Regions BPA Regional High School Science Bowl Print Text Size: A A A RSS Feeds FeedbackShare Page Regional Coordinator Information Name: Christy Adams Email: cfadams@bpa.gov Regional Event Information Date: Saturday, February 1, 2014 Maximum Number of Teams: 64 Maximum Number of Teams per School: 3

123

BPA Regional Middle School Science Bowl | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Oregon Regions » BPA Regional Middle School Oregon Regions » BPA Regional Middle School Science Bowl National Science Bowl® (NSB) NSB Home About High School Middle School Middle School Students Middle School Coaches Middle School Regionals Middle School Rules, Forms, and Resources Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov Oregon Regions BPA Regional Middle School Science Bowl Print Text Size: A A A RSS Feeds FeedbackShare Page Regional Coordinator Information Name: Christy Adams Email: cfadams@bpa.gov Regional Event Information Date: Saturday, January 25, 2014 Maximum Number of Teams: 64

124

BPA Regional Middle School Science Bowl | U.S. DOE Office of...  

Office of Science (SC) Website

teams taking precedence over third teams, with the goal of having as many different schools participating as possible. Please go to www.bpa.govgotoScienceBowl to register for...

125

BPA Regional High School Science Bowl | U.S. DOE Office of Science...  

Office of Science (SC) Website

teams taking precedence over third teams, with the goal of having as many different schools participating as possible. Please go to www.bpa.govgotoScienceBowl External link to...

126

3-15-11_Final_Testimony_(Wright)_(BPA).pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

which include tiered rates. Bonneville is proposing an 8.5 percent wholesale power rate increase primarily driven by the need for investment in the non-CO2 emitting, low...

127

Review of BPA Funded Sturgeon, Resident Fish and Wildlife Projects, 1989/1990.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) held a public meeting on November 6-7, 1990, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. The following pages list the projects by title, the project leaders and BPA's project officers, and an abstract of each leaders presentation. These summaries are in some cases preliminary; they are subject to change and should not be quoted without consulting the project leader.

United States. Bonneville Power Administration.

1990-12-01T23:59:59.000Z

128

Categorical Exclusion (CX) Determination Proposed Action: Elliot 115kV/43.8kV Transmission Substation Construction and Elliot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Elliot 115kV/43.8kV Transmission Substation Construction and Elliot Elliot 115kV/43.8kV Transmission Substation Construction and Elliot 43.8kV Transmission Line. Description of Proposed Action: The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, ND to be owned and operated by Western under Western's Valley City to Forman 115kV transmission line in addition to 8 miles of new 43.8kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.l1: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

129

Low Probability Tail Event Analysis and Mitigation in BPA Control Area: Task 2 Report  

SciTech Connect

Task report detailing low probability tail event analysis and mitigation in BPA control area. Tail event refers to the situation in a power system when unfavorable forecast errors of load and wind are superposed onto fast load and wind ramps, or non-wind generators falling short of scheduled output, causing the imbalance between generation and load to become very significant.

Lu, Shuai; Makarov, Yuri V.; McKinstry, Craig A.; Brothers, Alan J.; Jin, Shuangshuang

2009-09-18T23:59:59.000Z

130

Notice of Intent for the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line (DOE/EIS-0379) (05/05/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

56 56 Federal Register / Vol. 70, No. 86 / Thursday, May 5, 2005 / Notices Angeles to change between direct current and alternating current. This proposed converter station would be located in the vicinity of BPA's Port Angeles Substation in Clallam County, Washington, and would occupy from one to two acres. OC has proposed that the converter station be sited within the existing boundary of the Port Angeles Substation on property leased or otherwise transferred from BPA to OC. OC has proposed to begin construction of the HVDC transmission line and converter station by June 2006. Under this schedule, the HVDC system would be interconnected to the FCRTS in the fall of 2007, with a proposed operation date of December 2007. Once constructed, all existing land use and

131

Microsoft Word - 4.16.13 Final BPA Testimony  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WILLIAM K. DRUMMOND WILLIAM K. DRUMMOND ADMINISTRATOR BONNEVILLE POWER ADMINISTRATION U.S. DEPARTMENT OF ENERGY BEFORE THE SUBCOMMITTEE ON WATER AND POWER COMMITTEE ON NATURAL RESOURCES U.S. HOUSE OF REPRESENTATIVES APRIL 16, 2013 EXAMINING THE PROPOSED FISCAL YEAR 2014 SPENDING, PRIORITIES AND THE MISSIONS OF THE BUREAU OF RECLAMATION, THE FOUR POWER MARKETING ADMINISTRATIONS AND THE U.S. GEOLOGICAL SURVEY'S WATER PROGRAM Mr. Chairman and Members of the Subcommittee, I appreciate the opportunity to testify here today. My name is Bill Drummond. I am the Administrator of the Bonneville Power Administration (Bonneville) and welcome the opportunity to serve in this capacity. Before continuing with my remarks, I would like to first acknowledge the extraordinary public service

132

Environmental Assessment of Proposed Lynch Creek Substation Project : Service to Eatonville and the Ohop Valley.  

SciTech Connect

Bonneville Power Administation (BPA) proposes to construct 3.2 miles of 115-kV transmission line from a tap point on Tacoma City Light's Cowlitz-LaGrande 115-kV line to a new 115/12.5-kV, 15/20/25 MVA substation to be located about 1 mile northwest of Eatonville, adjacent to the Eatonville cutoff road. This plan was selected following initial consideration of five alternative plans for satisfying electrical needs in the project area and following agreement with BPA's customers on a vicinity for the substation site. The vicinity selected is midway between the two load centers and would require the least construction of distribution line. Subsequently, four alternative line routes and two substation sites have been evaluated. These alternatives provide a range of costs, engineering solutions, and potential environmental impacts. This evaluation led to the selection of one line route. This document describes possible environmental impacts of the proposed actions. 7 refs, 9 figs., 5 tabs.

United States. Bonneville Power Administration.

1983-05-01T23:59:59.000Z

133

Plant and operational features of the BPA 30 MJ superconducting magnetic energy storage system  

DOE Green Energy (OSTI)

A 30 MJ superconducting magnetic energy storage (SMES) system was designed and developed for application in the Western US Power System to damp power oscillations that limit high voltage ac transmission. The system is in place at the Bonneville Power Administration (BPA) Tacoma Substation and has been in an experimental use for over a year. Extended operations of the unit have been undertaken with success. The physical, electrical, and operational features of the SMES system are given.

Rogers, J.D.; Hauer, J.F.

1984-01-01T23:59:59.000Z

134

Wind Integration Forum June 6, 2011 Action Items Update December, 2011  

E-Print Network (OSTI)

Wind Integration Forum June 6, 2011 Action Items Update December, 2011 The action items from the June 6 Wind Integration Steering Committee are repeated below, followed by brief summaries of progress concern over possible impacts on grid stability from the growing wind fleet. BPA will report back

135

2007-2008 Annual Progress Report for BPA Grant Exp Restore Walla Walla River Flow  

DOE Green Energy (OSTI)

WWBWC and its partners have been working on a wide variety of conservation and aquifer recharge related activities including: monitoring groundwater and surface water conditions, creating a geospatial database for the Walla Walla River valley (project focal area), expanding aquifer recharge testing at the HBDIC site and conducting an extensive outreach/education program by which to share the information, ideas and potential solutions to our current water management issues in this basin. This report is an outline of those activities and is accompanied by individual program-component (attached as appendices) reports for the areas that BPA is assisting to fund these on-the-ground projects along with the innovative research and monitoring being done to further aquifer recharge as a water management tool for the Pacific Northwest.

Bower, Bob [WWBWC (Walla Walla Basin Watershed Council)

2009-07-10T23:59:59.000Z

136

EA-1855: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Action Plan (MAP) is part of the Finding of No Significant Impact for the Creston-Bell Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves...

137

Modulation and SSR tests performed on the BPA 500 kV thyristor controlled series capacitor unit at Slatt substation  

SciTech Connect

Field experience is reported for a thyristor controlled series capacitor (TCSC) recently commissioned at BPA`s Slatt substation. Subsynchronous resonance tests show that TCSC interactions with shaft dynamics of PGE`s Boardman steam generator are well understood and are effectively avoided by normal TCSC valve firing logic. Modulation tests, performed with the Boardman plant off line, show that the TCSC can be a powerful and responsive actuator for swing damping. Security considerations did not permit lightly damped operation of the controlled plant. Close analysis indicates that the TCSC damping contribution, though small, was measurable. The best estimate is that damping for the McNary mode is 7.33% and 8.55%, for the TCSC damper loop open and closed respectively. TCSC testing and monitoring is facilitated by an advanced interactive measurement network representing BPA`s approach to the information requirements of major control systems.

Hauer, J.F. [Pacific Northwest Lab., Richland, WA (United States); Mittelstadt, W.A. [Bonneville Power Administration, Portland, OR (United States); Piwko, R.J. [General Electric Co., Schenectady, NY (United States); Damsky, B.L. [Electric Power Research Inst., Palo Alto, CA (United States); Eden, J.D. [Portland General Electric, OR (United States)

1996-05-01T23:59:59.000Z

138

Low Probability Tail Event Analysis and Mitigation in BPA Control Area: Task One Report  

SciTech Connect

This is a report for task one of the tail event analysis project for BPA. Tail event refers to the situation in a power system when unfavorable forecast errors of load and wind are superposed onto fast load and wind ramps, or non-wind generators falling short of scheduled output, the imbalance between generation and load becomes very significant. This type of events occurs infrequently and appears on the tails of the distribution of system power imbalance; therefore, is referred to as tail events. This report analyzes what happened during the Electric Reliability Council of Texas (ERCOT) reliability event on February 26, 2008, which was widely reported because of the involvement of wind generation. The objective is to identify sources of the problem, solutions to it and potential improvements that can be made to the system. Lessons learned from the analysis include the following: (1) Large mismatch between generation and load can be caused by load forecast error, wind forecast error and generation scheduling control error on traditional generators, or a combination of all of the above; (2) The capability of system balancing resources should be evaluated both in capacity (MW) and in ramp rate (MW/min), and be procured accordingly to meet both requirements. The resources need to be able to cover a range corresponding to the variability of load and wind in the system, additional to other uncertainties; (3) Unexpected ramps caused by load and wind can both become the cause leading to serious issues; (4) A look-ahead tool evaluating system balancing requirement during real-time operations and comparing that with available system resources should be very helpful to system operators in predicting the forthcoming of similar events and planning ahead; and (5) Demand response (only load reduction in ERCOT event) can effectively reduce load-generation mismatch and terminate frequency deviation in an emergency situation.

Lu, Shuai; Makarov, Yuri V.

2009-04-01T23:59:59.000Z

139

Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement: Summary.  

SciTech Connect

BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

140

2007 Wholesale Power Rate Case Initial Proposal : Direct Testimony  

SciTech Connect

The purpose of this testimony is to provide the context and background to the financial and risk policy objectives for BPA's WP-07 Initial Proposal. The testimony contains eight sections. The first is this introduction. Section 2 provides background regarding BPA's Subscription Strategy and the Subscription contracts to which the WP-07 rates will apply. Section 3 describes the financial policy objectives considered when establishing the WP-07 rates. Section 4 describes BPA's risk profile, the risk mitigation tools used in prior rate periods, those proposed here, and additional tools under consideration for the FY 2007-2009 rate period. Section 5 describes financial policy directives and decisions that have shaped the WP-07 Initial Proposal. Section 6 describes the uncertainties of the current litigation regarding the National Marine Fisheries Service (NMFS) Federal Columbia River Power System (FCRPS) Biological Opinion and how it is addressed in this proposal. Section 7 briefly discusses the risk mitigation package in the WP-07 Initial Proposal. Finally, Section 8 describes some liquidity tools that may be incorporated into final studies if circumstances allow.

United States. Bonneville Power Administration.

2005-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Implementation Proposal for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for Implementation Proposal for The National Action Plan on Demand Response Report to Congress Prepared by staff of the Federal Energy Regulatory Commission and the U.S. Department of Energy The opinions and views expressed in this staff report do not necessarily represent those of the Federal Energy Regulatory Commission, its Chairman, or individual Commissioners, and are not binding on the Commission. Implementation Proposal for The National Action Plan on Demand Response July 2011 TABLE OF CONTENTS Executive Summary ............................................................................................... iii I. Introduction ......................................................................................................1

142

Categorical Exclusion Determination Form Proposed Action Title...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

54) Varentec Inc. - Compact Dynamic Phase Angle Regulators for Transmission Power Routing Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City...

143

Enforcement Action - EA-2005-07  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

your response to the PNOV, including your proposed corrective actions entered into the NTS, DOE will determine whether further enforcement action is necessary to ensure...

144

Columbia River Basin Accords -Narrative Proposal Form 1 FY 2008-2009 F&W Program Accords (MOA) Proposal Review  

E-Print Network (OSTI)

-042-00 UPA Wenatchee Program BPA 2007-086-00 UPA Wenatchee Riparian BPA 2007-318-00 UPA Knapp-Wham Hanan

145

2007 Wholesale Power Rate Case Final Proposal : Market Price Forecast Study.  

Science Conference Proceedings (OSTI)

This study presents BPA's market price forecasts for the Final Proposal, which are based on AURORA modeling. AURORA calculates the variable cost of the marginal resource in a competitively priced energy market. In competitive market pricing, the marginal cost of production is equivalent to the market-clearing price. Market-clearing prices are important factors for informing BPA's power rates. AURORA was used as the primary tool for (a) estimating the forward price for the IOU REP Settlement benefits calculation for fiscal years (FY) 2008 and 2009, (b) estimating the uncertainty surrounding DSI payments and IOU REP Settlements benefits, (c) informing the secondary revenue forecast and (d) providing a price input used for the risk analysis. For information about the calculation of the secondary revenues, uncertainty regarding the IOU REP Settlement benefits and DSI payment uncertainty, and the risk run, see Risk Analysis Study WP-07-FS-BPA-04.

United States. Bonneville Power Administration.

2006-07-01T23:59:59.000Z

146

Microsoft Word - BPA Comments on form EIA-930 _final_.docx  

Annual Energy Outlook 2012 (EIA)

- BONNEVILLE'S COMMENTS ON FORM EIA-930 BEFORE THE ENERGY INFORMATION ADMINISTRATION Agency Information Collection ) Proposed at Extension with Changes ) 78 Fed. Reg. 14521...

147

Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.  

Science Conference Proceedings (OSTI)

BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

148

Proposal Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Process R&D Overview 100G Testbed Testbed Description Testbed Results Current Testbed Research Proposal Process Terms and Conditions Virtual Circuits (OSCARS) Performance...

149

Microsoft Word - 01_Cover_042312rev.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hatchery Project (Proposed Action). BPA is proposing to fund the Idaho Department of Fish and Game (IDFG) to modify and operate an existing hatchery facility located near the...

150

Microsoft Word - 3-20-12 Final Testimony _Wright_ _BPA_.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MR. STEPHEN J. WRIGHT MR. STEPHEN J. WRIGHT ADMINISTRATOR BONNEVILLE POWER ADMINISTRATION U.S. DEPARTMENT OF ENERGY BEFORE THE SUBCOMMITTEE ON WATER AND POWER COMMITTEE ON NATURAL RESOURCES U.S. HOUSE OF REPRESENTATIVES MARCH 20, 2012 EXAMINING THE PROPOSED FISCAL YEAR 2013 SPENDING, PRIORITIES AND THE MISSIONS OF THE BONNEVILLE POWER ADMINISTRATION, THE WESTERN AREA POWER ADMINISTRATION, THE SOUTHWESTERN POWER ADMINISTRATION AND THE SOUTHEASTERN POWER ADMINISTRATION Mr. Chairman and Members of the Subcommittee, I appreciate the opportunity to testify here today. My name is Steve Wright. I am the Administrator of the Bonneville Power Administration (Bonneville). I am pleased to be here today to discuss the President's Fiscal Year (FY) 2013 Budget as it relates to Bonneville.

151

Proposal Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Deadline: June 30, 2008 Funding LLNL supports projects with funding from University of California. Funding for the IGPP Minigrant projects is limited to 50,000 per...

152

Standards Actions, May 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-2001 30-2001 Activity Summary In Conversion - 4 In Preparation - 39 Out for Comment - 19 Published this Month - 0 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 23 Cancellation Pending - 9 Cancellation in Progress - 18 No Current Action - 12 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Proposed for Reaffirmation 1 Proposed Cancellation of DOE Technical Standards 2 Published DOE Technical Standards 3 American National Standards Institute 3 American National Standards 6 American Society for Testing and Materials 6 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. May 2001 Standards Actions DOE Technical Standards Projects Initiated

153

Conceptual Proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

-1-08 submitted to Energy Engineering -1-08 submitted to Energy Engineering Action-Oriented Benchmarking: Using the CEUS Database to Benchmark Commercial Buildings in California Paul Mathew & Evan Mills, Lawrence Berkeley National Laboratory Norman Bourassa & Martha Brook, California Energy Commission ABSTRACT The 2006 Commercial End Use Survey (CEUS) database developed by the California Energy Commission is a far richer source of energy end-use data for non-residential buildings than has previously been available and opens the possibility of creating new and more powerful energy benchmarking processes and tools. In this article - Part 2 of a two-part series - we describe the methodology and selected results from an action-oriented benchmarking approach using the new

154

Survey of Magnetic Fields Near BPA 230-kV and 500-kV Transmission Lines.  

Science Conference Proceedings (OSTI)

The purpose of this study was to characterize typical levels and variability of 60Hz magnetic fields at the centerline and edge of right-of-way of Bonneville Power Administration (BPA) 230-kV and 500-kV transmission lines. This was accomplished by taking magnetic field measurements at over 800 spans in Oregon and Washington. The spans were sampled using a stratified random sampling procedure with region (East vs. West), voltage (230-kV vs 500-kV), and circuit configuration as strata. There were five different circuit configuration groups for each region/voltage category requiring a total of 200 strata. Magnetic field measurements were taken at 13 locations under each span using an EMDEX-C as a survey meter. Additional information recorded for each span included conductor height (at 10 locations), right-of-way width, longitudinal and lateral slope, time of day, vegetation, terrain, weather conditions, temperature, wind speed, span length and presence of other lines in the corridor. 9 refs., 17 figs., 26 tabs.

Perrin, Nancy; Aggarwal, Rajinder Pal; Bracken, T. Daniel

1991-05-20T23:59:59.000Z

155

Unsolicited Proposals  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy's (DOE’s) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) which includes all DOE Program Research Areas.   

156

Annual Report on Wildlife Activities, September 1985 - April 1986, Action item 40.1, Columbia River Basin Fish and Wildlife Program.  

DOE Green Energy (OSTI)

This annual report addresses the status of wildlife projects Bonneville Power Administration (BPA) has implemented from September 1985 to April 1986 under the Columbia River Basin Fish and Wildlife Program (Program) established pursuant to the Northwest Power Act (P.L. 96-501). Wildlife projects implemented prior to September 1985 are discussed in BPA's September 1985 Annual Report on Wildlife Activities. This report provides a brief synopsis, review, and discussion of wildlife activities BPA has undertaken. When available, annual and final reports are listed for each project. The wildlife section of the Program establishes a process intended to achieve two objectives: wildlife protection, mitigation, and enhancement planning; and implementation of actions to protect, mitigate, and enhance wildlife affected by development and operation of hydroelectric facilities in the Columbia River Basin. The wildlife mitigation planning process developed by the Northwest Power Planning Council (Council) is a stepwise process that proceeds through the review of the status of wildlife mitigation at Columbia River Basin hydroelectric facilities [Measure 1004 (b)(l)]; estimates wildlife losses from hydroelectric development and operation [Measure 1004 (b)(2)]; and recommends actions for the protection, mitigation, or enhancement of wildlife [Measure 1004 (b)(3), Mitigation Plans]. Implementation of wildlife protection, mitigation, and enhancement will occur upon amendment of wildlife actions into the Program by the Council. The majority of BPA's effort to date has gone towards coordinating and implementing wildlife protection, mitigation, and enhancement planning projects.

United States. Bonneville Power Administration.

1986-04-01T23:59:59.000Z

157

Annual Review of BPA-Funded Projects in Natural and Artificial Propagation of Salmonids, March 27-29, 1985, Holiday Inn Airport, Portland, Oregon.  

Science Conference Proceedings (OSTI)

The Fish and Wildlife Division of Bonneville Power Administration (BPA) hosted a meeting for contractors to present the results of fiscal year 1984 research conducted to implement the Northwest Power Planning Council's Fish and Wildlife Program. The meeting focused on those projects specifically related to natural and artificial propagation of salmonids. The presentations were held at the Holiday Inn Airport in Portland, Oregon, on March 27-29, 1985. This document contains abstracts of the presentations from that meeting. Section 1 contains abstracts on artificial propagation, fish health, and downstream migration, and Section 2 contains abstracts on natural propagation and habitat improvement. The abstracts are indexed by BPA Project Number and by Fish and Wildlife Program Measure. The registered attendees at the meeting are listed alphabetically in Appendix A and by affiliation in Appendix B.

United States. Bonneville Power Administration.

1985-04-01T23:59:59.000Z

158

Standards Actions, May 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-29-2002 4-29-2002 Activity Summary In Conversion - 4 In Preparation - 47 Out for Comment - 12 Published this Month - 6 5-year Review Status Revision in Progress - 10 Reaffirmation in Progress - 12 Supersedure in Progress - 0 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 20 Inside this issue: DOE Technical Standards Proposed for Reaffirmation 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- May 2002 Standards Actions DOE Technical Standards Proposed for Reaffirmation The following documents are currently being reevaluated under the 5-year

159

Electrical Energy Conservation Analyses of the Wood Products (SIC24) Industry in the BPA Service Sistrict : Mill Summary Report : Champion International Corporation, Roseburg, Oregon.  

Science Conference Proceedings (OSTI)

This report presents the partial results of a study conducted by Trans Energy Systems Industrial Division of URS Company for the Bonneville Power Administration (BPA) under contract AC79-84BP18946. The objective of this effort was an electrical energy conservation analysis of the Wood Products Industry (Standard Industrial Code (SIC) 24) in the BPA service district. The analysis was conducted by selecting five representative mills in the BPA service area and performing electrical energy conservation surveys and analyses of these mills. This report presents the results of data gathering and analysis at the Champion International Corporation plywood mill in Roseburg, Oregon, which produces exterior, interior, sanded and tongue and groove/shiplap softwood plywood. The plant produces 170 million square feet of 3/8-inch basis plywood annually. Species processed include Douglas fir and hemlock. This report summarizes the mill data collected, the technical and economic analyses performed, the strategy used in ranking the individual electrical energy conservation opportunities found in each mill, the recommended energy conservation measures (ECM), the projected cost benefits of each ECM and the estimated impacts of each ECM on plant production and operation.

TransEnergy Systems, Inc.

1985-01-01T23:59:59.000Z

160

Microsoft Word - CX-2010 Control House Seismic Upgrades_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and non-structural seismic upgrades, and perform minor architectural work at each substation. Findings: BPA has determined that the proposed action complies with Section...

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Action Items  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACTION ITEMS ACTION ITEMS Presentation to the DOE High Level Waste Corporate Board July 29, 2009 Kurt Gerdes Office of Waste Processing DOE-EM Office of Engineering & Technology 2 ACTION ITEMS Action Item Status * Approve Performance Assessment Community of Practice Charter * Charter approved 13 July 2009 by majority vote of Board (balloting conducted by e- mail). * Report on first Performance Assessment Community of Practice meeting * Meeting held on 13-14 July 2009. Report by David Kosson, PhD, Vanderbilt University and CRESP * Update of Tank Waste Corporate Board Charter to include changes resulting from changes in Office of Environmental Management * In progress (pending completion of any reorganization) * Update of Performance Assessment Community of Practice Charter to include

162

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21813 21813 Vol. 76, No. 75 Tuesday, April 19, 2011 DEPARTMENT OF ENERGY 10 CFR Part 429 [Docket Number: EERE-2010-BT-CE-0014] RIN 1904-AC23 Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Proposed rule. SUMMARY: The U.S. Department of Energy (DOE or the ''Department'') proposes to amend the compliance dates for revisions to its certification, compliance, and enforcement regulations for certain commercial and industrial equipment covered under the Energy Policy and Conservation Act of 1975, as amended (EPCA or the ''Act''). Specifically, DOE is tentatively proposing an 18-month extension to the

163

Mitigation Action Plan  

Science Conference Proceedings (OSTI)

This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

Not Available

1994-02-01T23:59:59.000Z

164

February 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Technical Standards Program Document Status 1-18-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 10 Published in January - 3 5-year Review Status Proposed for Revision-6 Revision in Progress-4 Proposed for Reaffirmation-3 Reaffirmation in Progress-21 Cancellation Pending-16 Cancellation in Progress-0 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/ February 2005 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://tis.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

165

July 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical DOE Technical Standards Program Document Status 06-28-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 14 Published in June - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ July 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

166

April 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-27-2008 3-27-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in March - 0 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ April 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

167

July 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-27-2007 6-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed forReaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://hss.energy.gov/nuclear safetytechstds/ July 2007 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

168

October 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Publication Staff Roster 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-26-2006 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 16 Published in September - 1 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ October 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access

169

May 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-25-2008 4-25-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in April - 2 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ May 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

170

November 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 10-25-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 16 Published in September - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6

171

BPA Riparian Fencing and Alternative Water Development Projects Completed within Asotin Creek Watershed, 2000 and 2001 Asotin Creek Fencing Final Report of Accomplishments.  

DOE Green Energy (OSTI)

The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington in Water Resource Inventory Area (WRIA) 35. According to Washington Department of Fish and Wildlife's (WDFW) Priority WRIA's by ''At-Risk Stock Significance Map'', it is the highest priority WRIA in southeastern Washington. Summer steelhead, bull trout, and Snake River spring chinook salmon which are listed under the Endangered Species Act (ESA), are present in the watershed. WDFW manages it as a Wild Steelhead Reserve; no hatchery fish have been released here since 1997. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe, Washington Department of Ecology (DOE), National Marine Fisheries Service (NMFS), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. Local students, volunteers and Salmon Corps members from the Nez Perce Tribe have been instrumental in the success of the Model Watershed Program on Asotin Creek. ACCD began coordinating habitat projects in 1995 with the help of BPA funding. Approximately two hundred and seventy-six projects have been implemented as of 1999. The Washington State Legislature was successful in securing funding for endangered salmon and steelhead recovery throughout the State in 1998. While these issues were new to most of the State, the ACCD has been securing and administering funding for endangered salmonids since 1994. The ''Asotin Creek Riparian Planting 2000-053-00 and Asotin Creek Riparian Fencing 2000-054-00'' teamed BPA and the Governor's Salmon Recovery Funding to plant approximately 84,191 trees and shrubs in the Asotin Creek Watershed. In addition BPA and private cost-share dollars were utilized to drill 3 wells, provide 15 off-site alternative water developments (troughs), 5 spring developments, and 9,100 feet of riparian fencing. The trees will provide shade and long-term LWD recruitment to the stream. The wells, alternative water developments, springs and fencing will reduce direct animal impacts on the stream. In one area alone, a well, 3,000 ft of riparian fence with 5 alternative water developments will exclude 300 head of cattle from using the stream as a source of drinking water during the winter months.

Johnson, B.J. (Bradley J.)

2002-01-01T23:59:59.000Z

172

April 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 1 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 3-28-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 11 Published in March - 0 5-year Review Status Proposed for Revision-6 Revisions in Progress-4 Proposed for Reaffirmation-3 Reaffirmations in Progress-24 Cancellations Pending-11 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards

173

August 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 07-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

174

October 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-27-2007 Activity Summary In Conversion - 4 In Preparation - 26 Out for Comment - 27 Published in September - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

175

August 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 07-26-2006 Activity Summary In Conversion - 4 In Preparation - 22 Out for Comment - 16 Published in July - 2 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0

176

Microsoft Word - NEPA_CX_Acquisition_of_OTEC_Disconnect_Switch_LaGrand_Substation_05-08-2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kelly Miller Kelly Miller Project Manager - TG-DITT-2 Proposed Action: BPA Acquisition of OTEC Disconnect Switch at the BPA LaGrande Substation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B 1.24 Property Transfer Location: BPA LaGrande Substation, in the City of LaGrande, Union County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to purchase the 230-kilovolt (kV) main bus disconnect switch (MB A-270) that is currently installed and operating within the BPA LaGrande Substation. The disconnect switch is owned by the Oregon Trail Electric Cooperative (OTEC). On October 7, 2011, the manager of engineering for OTEC requested that BPA purchase the disconnect switch. The disconnect switch is the only piece of equipment within

177

Emergencies and Emergency Actions | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergencies and Emergency Actions Emergencies and Emergency Actions Emergencies and Emergency Actions Selected documents on the topic of Emergencies and Emergency Actions under NEPA. May 12, 2010 Memorandum for Heads of Federal Departments and Agencies: Emergencies and NEPA With this Memorandum, the Council on Environmental Quality reiterates its previous guidance on the National Environmental Policy Act (NEPA) environmental review of proposed emergency response actions.This memorandum clarifies that the previous guidance remains applicable to current situations and provides guidance on required agency environmental review. September 8, 2005 Memorandum for Federal NEPA Contacts: Emergency Actions and NEPA This Council on Environmental Quality memorandum provides general information on (1) the response to hurricane Katrina;

178

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

179

Proposed Rules DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Federal Register 4 Federal Register / Vol. 76, No. 1 / Monday, January 3, 2011 / Proposed Rules DEPARTMENT OF ENERGY [Docket ID: DOE-HQ-2010-0002] 10 CFR Part 1021 RIN 1990-AA34 National Environmental Policy Act Implementing Procedures AGENCY: Office of the General Counsel, U.S. Department of Energy. ACTION: Notice of proposed rulemaking and public hearing. SUMMARY: The U.S. Department of Energy (DOE or the Department) proposes to amend its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The majority of the changes are proposed for the categorical exclusions provisions contained in its NEPA Implementing Procedures, with a small number of related changes proposed for other provisions. These proposed changes are intended to better align the

180

(DOE/EIS-0285/SA-45): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5) 5) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Benton County noxious weed management along BPA rights-of-ways, transmission structures, roads, and switches listed in Attachment 1. Attachment 1 identifies the ROW, ROW width, and ROW length of the proposed action. Includes all BPA 115kV, 230kV, 345kV and 500 kV ROWs in Benton County, Washington. Location: The ROWs are all located in Benton County, Washington, Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear noxious and/or unwanted low-growing vegetation in all BPA ROWs in Benton County, Washington. In a cooperative effort, BPA, through landowners and the Benton County Weed Control Board, plan to eradicate noxious plants and other

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

(DOE/EIS-0285/SA-46): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6) 6) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Franklin County noxious weed management along BPA rights-of-ways, transmission structures, roads, and switches listed in Attachment 1. Attachment 1 identifies the ROW, ROW width, and ROW length of the proposed action. Includes all BPA 115kV, 230kV, and 500 kV ROWs in Franklin County, Washington. Location: The ROWs are all located in Franklin County, Washington in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear noxious and/or unwanted low-growing vegetation in all BPA ROWs in Franklin County, Washington. In a cooperative effort, BPA, through landowners and the Franklin County Weed Control Board, plan to eradicate noxious plants and other

182

Corrective Action Management Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Corrective Action Management Program (CAMP) Home CAMP Background DOE Directives Corrective Action Management Team Corrective Action Tracking System (CATS) CAMP Quarterly Reports...

183

August 2001 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7-31-2001 7-31-2001 Activity Summary In Conversion-4 In Preparation-43 Out for Comment-17 Published this Month-0 5-year Review Status Revision in Progress-6 Reaffirmation in Progress-23 Cancellation Pending-4 Cancellation in Progress-12 Proposed for Cancellation-13 No Current Action-11 Inside this issue: DOE Technical Standards Project Initiated 1 DOE Technical Standards Recently Sent for Coordination 1 DOE Technical Standard Recently Reaffirmed 1 DOE Technical Standards Recently Published 2 American National Standards Institute 2 American National Standards 4 American Society for Testing and Materials 5 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- August 2001 Standards

184

Corrective Actions Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Stewardship Environmental Cleanup Corrective Actions Corrective Actions Process The general process for evaluating and remediating potential release sites is called...

185

July 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 06-28-2005 Activity Summary In Conversion - 4 In Preparation - 21 Out for Comment - 10 Published in June - 2 5-year Review Status Proposed for Revision-6 Revision in Progress-3

186

RCRA corrective action determination of no further action  

SciTech Connect

On July 27, 1990, the U.S. Environmental Protection Agency (EPA) proposed a regulatory framework (55 FR 30798) for responding to releases of hazardous waste and hazardous constituents from solid waste management units (SWMUs) at facilities seeking permits or permitted under the Resource Conservation and Recovery Act (RCRA). The proposed rule, `Corrective Action for Solid Waste Management Units at Hazardous Waste Facilities`, would create a new Subpart S under the 40 CFR 264 regulations, and outlines requirements for conducting RCRA Facility Investigations, evaluating potential remedies, and selecting and implementing remedies (i.e., corrective measures) at RCRA facilities. EPA anticipates instances where releases or suspected releases of hazardous wastes or constituents from SWMUs identified in a RCRA Facility Assessment, and subsequently addressed as part of required RCRA Facility Investigations, will be found to be non-existent or non-threatening to human health or the environment. Such releases may require no further action. For such situations, EPA proposed a mechanism for making a determination that no further corrective action is needed. This mechanism is known as a Determination of No Further Action (DNFA) (55 FR 30875). This information Brief describes what a DNFA is and discusses the mechanism for making a DNFA. This is one of a series of Information Briefs on RCRA corrective action.

NONE

1996-06-01T23:59:59.000Z

187

Microsoft Word - G0418 Mariah Wind CX  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kevlyn Mathews Kevlyn Mathews Project Manager - TPCV-TPP-4 Proposed Action: Mariah Wind, LLC Small Generator Integration Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic equipment Location: Boardman, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to integrate Mariah Wind, LLC's 20 megawatt wind project into BPA's balancing authority in response to Mariah Wind LLC's small generator interconnection request. The proposed point of interconnection is at Columbia Basin Electric Cooperative's (CBEC) 69-kilovolt (kV) Sand Hollow Tap line, which is connected to BPA's Boardman-Ione 69-kV line. Metering equipment and telemetry gear will be provided by BPA and will be installed at the applicant's collector substation and at BPA's

188

Klondike III/Biglow Canyon Wind Integration Project; Record of Decision, October 25, 2006.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE)1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects, BPA will build and operate a 12-mile long, 230-kilovolt (kV) double-circuit transmission line between the wind projects and BPA's new 230-kV John Day Substation in Sherman County, Oregon. BPA will also expand its existing 500-kV John Day Substation.

United States. Bonneville Power Administration

2006-10-25T23:59:59.000Z

189

Columbia Cascade Province MOA Habitat Proposal November 2009 Project No. 2009-00-003 1 Yakama Nation  

E-Print Network (OSTI)

?) BPA 58% Mixed 200731800 Entiat River - UPA - Knapp-Wham Hanan Detwiler Irrigation System Consolidation

190

Microsoft Word - CX- Eugene Substation Fiber_130520.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Jonathan Toobian Project Manager - TPC-TPP-4 Proposed Action: Eugene Substation Fiber Interconnection Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 4.7 Fiber Optic Cable Location: Eugene, Lane County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes allowing Light Speed Networks (LSN) to interconnect with its existing fiber optic network at BPA's Eugene substation in Lane County, Oregon. To interconnect to BPA's fiber network, LSN would install two new below ground fiber optic vaults within BPA's existing right-of-way. The first vault would be installed on BPA fee-owned land immediately south of the existing substation entrance, while the second vault

191

A Multiple Watershed Approach to Assessing the Effects of Habitat Restoration Actions on Anadromous and Resident Fish Populations, Technical Report 2003-2004.  

DOE Green Energy (OSTI)

Habitat protection and restoration is a cornerstone of current strategies to restore ecosystems, recover endangered fish species, and rebuild fish stocks within the Columbia River Basin. Strategies featuring habitat restoration include the 2000 Biological Opinion on operation of the Federal Columbia River Power System (FCRPS BiOp) developed by the National Marine Fisheries Service (NMFS), the 2000 Biological Opinion on Bull Trout developed by the US Fish and Wildlife Service (USFWS), and Sub-Basin Plans developed under the Fish and Wildlife Program of the Northwest Power and Conservation Council (NWPCC). There is however little quantitative information about the effectiveness of different habitat restoration techniques. Such information is crucial for helping scientists and program managers allocate limited funds towards the greatest benefits for fish populations. Therefore, it is critical to systematically test the hypotheses underlying habitat restoration actions for both anadromous and resident fish populations. This pilot project was developed through a proposal to the Innovative Projects fund of the NWPCC (ESSA 2002). It was funded by the Bonneville Power Administration (BPA) following reviews by the Independent Scientific Review Panel (ISRP 2002), the Columbia Basin Fish and Wildlife Authority (CBFWA 2002), the NWPCC and BPA. The study was designed to respond directly to the above described needs for information on the effectiveness of habitat restoration actions, including legal measures specified in the 2000 FCRPS BiOp (RPA 183, pg. 9-133, NMFS 2000). Due to the urgency of addressing these measures, the timeline of the project was accelerated from a duration of 18 months to 14 months. The purpose of this pilot project was to explore methods for evaluating past habitat restoration actions and their effects on fish populations. By doing so, the project will provide a foundation of retrospective analyses, on which to build prospective, multi-watershed designs for future habitat restoration actions. Such designs are being developed concurrently with this project by several other groups in the Columbia Basin (RME Workgroup 2003, NMFS 2003, Hillman and Paulsen 2002, Hillman 2003). By addressing questions about habitat restoration and monitoring (in coordination with other related efforts), we hope that this project will catalyze a shift in the Basin's paradigm of habitat restoration, moving from implementation of individual watershed projects towards rigorously designed and monitored, multiwatershed, adaptive management experiments. The project involved three phases of work, which were closely integrated with various related and ongoing efforts in the region: (1) Scoping - We met with a Core Group of habitat experts and managers to scope out a set of testable habitat restoration hypotheses, identify candidate watersheds and recommend participants for a data evaluation workshop. (2) Data Assembly - We contacted over 80 scientists and managers to help evaluate the suitability of each candidate watershed's historical data for assessing the effectiveness of past restoration actions. We eventually settled on the Yakima, Wenatchee, Clearwater, and Salmon subbasins, and began gathering relevant data for these watersheds at a workshop with habitat experts and managers. Data assembly continued for several months after the workshop. (3) Data Analysis and Synthesis - We explored statistical approaches towards retrospectively analyzing the effects of restoration 'treatments' at nested spatial scales across multiple watersheds (Chapters 2-5 of this report). These analyses provided a foundation for identifying existing constraints to testing restoration hypotheses, and opportunities to overcome these constraints through improved experimental designs, monitoring protocols and project selection strategies (Chapters 6 and 7 of this report). Finally, we developed a set of recommendations to improve the design, implementation, and monitoring of prospective habitat restoration programs in the Columbia River Basin (Chapter 8).

Marmorek, David

2004-03-01T23:59:59.000Z

192

60-DAY Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60-DAY Federal Register Notice - Proposed 60-DAY Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the

193

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Energy Storage Pilots  

E-Print Network (OSTI)

Storage ­ Not just batteries! #12;B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 3 · Installed and storage · Small-scale battery energy storage · Load increase using aquifer recharge opportunities #12;B O operational costs for deep well pumping. This has several benefits including helping BPA to address

194

2013 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Coal Survey Form Changes 2013 Proposals The U.S. Energy Information Administration (EIA) is proposing to change its data protection policy for the following survey forms: Form...

195

SSRL Call for Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Crystallography proposals are due April 1 and July 1 Due to the installation and commissioning of SPEAR3 (April 2003-January 2004), the schedule for proposal submissions has...

196

EMSL: Proposal Extensions  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Summary/Extension for Fiscal Year 2014 Proposal Summary/Extension for Fiscal Year 2014 Published December 2013. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo Summaries of the work performed with EMSL resources are required for all user projects (see details below) and should be submitted through the User Portal. For projects open for one year or less, these summaries are due when the proposal closes. For projects that are submitted in response to a Call for Proposals and are eligible for yearly extensions, summaries are

197

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Corrective Action Report Planning Worksheet Document Number: F-017 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-017 Corrective Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 11_0414 Added problem statement to first block. F-017 Corrective Action Report Planning Worksheet 11_0414 3 of 3 Corrective Action Report Planning Worksheet Corrective Action Number: Source: Details/Problem Statement: Raised By: Raised Date: Target Date:

198

ADDENDUM TO ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE SITE  

Office of Legacy Management (LM)

ADDENDUM TO ADDENDUM TO ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE SITE PROPOSED INTERIM REMEDIAL ACTIONS FOR FY 1983-85 ACCELERATED PROGRAM (1984 VICINITY PROPERTIES CLEANUP) Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois July 1984 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee CONTENTS Page SUMMARY OF PROPOSED ACTION AND RELATED ACTIVITIES ........... 1 HISTORY AND ENVIRONMENTAL SETTING ........................ 4 RADIOLOGICAL CONTAMINATION AND NEED FOR PROPOSED ACTION ........ 4 Property A .. . . . . . . . . . . . . . . . .. . . . . . . 6 Property C' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Property H ...... ............. ... 7 Property H' . . . . . . . . . . . . . . . . . . .. . . . . . . . . 7 Property L ..... ...... .

199

Momentum Dependent Fundamental Action  

E-Print Network (OSTI)

The fundamental action is dependent on momentum. Some consequences are presented for matter waves and scalar quantum field theory.

Karl De Paepe

2005-07-26T23:59:59.000Z

200

About Gender Action  

E-Print Network (OSTI)

Gender Action was established in 2002. It is the only organization dedicated to promoting gender justice and women’s rights in all International Financial Institution (IFI) investments such as those of the World Bank. Gender Action’s goal is to ensure that women and men equally participate in and benefit from all IFI investments.

unknown authors

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EMSL: Proposal Guidance:  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance for Fiscal Year 2014 Guidance for Fiscal Year 2014 Published December 2013 EMSL awards the majority of resources to proposals responding to the annual calls/cycles. To expedite the decision process, please contact the appropriate Capability Lead(s) based on your resource needs before beginning a proposal. Capabilities and contact information are detailed on EMSL's capability web pages. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo An EMSL user proposal requires detailed information for a thorough peer and

202

JGI - CSP Proposal Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Schedule Proposal Schedule CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ Small-scale Microbial/Metagenome Proposals - reviewed twice yearly Small-scale proposals for specific types of microbial and metagenome projects are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for submission is 60 days prior to the review date. Next review dates (submission deadline in parentheses): January 2014 (Nov 22, 2013) July 2014 (May 23, 2014) Submit small-scale microbial/metagenome proposals anytime using the Work Initiation Process (WIP) interface. Synthetic Biology proposals Synthetic biology proposals are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for

203

Climate Action Tracker | Open Energy Information  

Open Energy Info (EERE)

Tracker Tracker Jump to: navigation, search Tool Summary Name: Climate Action Tracker Agency/Company /Organization: Ecofys Sector: Climate Topics: GHG inventory, Low emission development planning Resource Type: Guide/manual Website: www.climateactiontracker.org/ Climate Action Tracker Screenshot References: Climate Action Tracker[1] "This "Climate Action Tracker" is an independent science-based assessment, which tracks the emission commitments and actions of countries. The website provides an up-to-date assessment of individual national pledges to reduce their greenhouse gas emissions. In the framework of the UNFCCC, many countries have put proposals on the table about how much they intend to reduce their greenhouse-gas emissions in both the near and the long term.

204

60-DAY Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of

205

Microsoft Word - Omak-Area-3G-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2011 9, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Roger Thomas Project Manager - TECT-CSB-1 Proposed Action: Omak Area 3G Radio Site Upgrades Budget Information: Work Orders 197229, 197230, & 197231; Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 "Siting, construction, and operation of microwave and radio communication towers and associated facilities..." Location: Okanogan and Douglas counties, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade communication equipment at three existing BPA facilities in Okanogan and Douglas counties, Washington. The work would occur at two

206

Microsoft Word - CX-TroutdaleWindowReplacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2011 , 2011 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Eric Weekley Project Manager - NWM-4 Proposed Action: Replace existing steel windows at the Troutdale Substation control house PP&A Project No.: PP&A-1699 Budget Information: Work Order No. 242796 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities and custodial services for buildings, structures, ... Location: Bonneville Power Administration's (BPA) Troutdale Substation located in Troutdale, Oregon Proposed by: BPA Description of the Proposed Action: BPA proposes to replace the deteriorating existing steel windows at the Troutdale Substation control house with new, in-kind steel windows.

207

General User Proposal Scores  

NLE Websites -- All DOE Office Websites (Extended Search)

General User Proposal Scores General User Proposal Scores General User Proposal Scores Print Tuesday, 01 June 2010 10:34 Scoring Proposals are scored on a scale of 1 to 5, with 1 being the best score and 5 the worst. Reviewers are requested to use the following ranking schema: Must do High Priority Medium Priority Low priority Don't do Beam time is assigned based on each proposal's score in relation to all other proposals for a given beamline. For beamlines where beamtime requests exceed available beamtime, a cutoff score is assigned after which no beam time is allocated. proposal scores Beam Time Cutoff Scores for the Current Cycle The table below lists the percent of beam time shifts allocated/requested for each beamline, and the cutoff scores, below which no beam time was assigned.

208

Microsoft Word - CX-DNRCulvertsFY12_WEB .docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2012 30, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Rick Ross Engineer - TELF-TPP-3 Proposed Action: BPA/DNR Access Road Improvements Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B1.3, Routine maintenance Location: Jefferson, Clallam, King and Skamania counties, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to replace existing culverts at eight access road stream crossings that present barriers to fish passage. These improvements will be made on BPA easement access roads within Washington State Department of Natural Resources (DNR) owned and managed lands. BPA will make these improvements by installing new fish friendly

209

Microsoft Word - Delrio_ChiefJo_FosterCreek_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2012 6, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager -TEP-CSB-1 Proposed Action: D Analog Communications Retirement at Del Rio, Chief Joseph, and Foster Creek Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meteorological, and radio towers Location: Douglas County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade communication equipment at three existing facilities in Douglas County, Washington. The work would occur at two of BPA's substations, Del Rio and Chief Joseph, and at BPA's Foster Creek radio site. Activities at these sites are in connection with the retirement of BPA's D analog communication system. At Del Rio, activities would

210

Microsoft Word - CX-OTEC-West-JohnDaySub-MeterProjectFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Walker Miller Walker Miller Electrical Engineer - TPCF-PASCO Proposed Action: Revenue Meter Replacement at Oregon Trail Electric Co-op's (OTEC's) West John Day Substation PP&A Project No: 2595 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: Grant County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace an old JEM1 revenue meter at OTEC's West John Day Substation. The meter would be replaced with a new JEMStar meter inside OTEC's existing control house. The new meter would allow BPA to meter load from a new transformer OTEC is installing. This meter will be installed by BPA personnel and it will remain the property and responsibility of BPA.

211

Microsoft Word - CX-AlveyPascoSnoh-HF-Antenna_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2013 1, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Roger Thomas Project Manager - TECT-CSB-1 Proposed Action: Install high frequency antennas at Bonneville Power Administration (BPA) maintenance headquarters PP&A Project No.: 2,600 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meteorological, and radio towers Locations: Multiple; including BPA's Alvey, Pasco, and Snohomish maintenance headquarters Proposed by: BPA Description of the Proposed Action: BPA proposes to install high frequency radio antennas within existing BPA maintenance headquarters sites. Antenna design varies by site, but generally the small antennas will be mounted between 20-35 feet above the ground using one or

212

(DOE/EIS-0285/SA-10): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0) 0) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Covington-Duwamish No. 1 ROW from the Covington Substation to tower 10/4. Location: The ROW is located in King County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to

213

Corrective and Preventive Action  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 EOTA - Business Process Document Title: Corrective/Preventive Action Process Document Number: P-008 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): P-004 Business System Management Review, F-017 Corrective Action Report Planning Worksheet or F-018 Preventive Action Report Planning Worksheet P-008 Corrective/Preventive Action Process 11_0414 Page 2 of 8 Revision History: Rev. Description of Change A Initial Release 08_0310 Implemented Multiple reviewer of "Root Cause" into process. 08_0313 Changed verbiage in Process, Responsibility and Definitions for clarification. Assigned new Backup Document Owner.

214

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Preventive Action Report Planning Worksheet Document Number: F-018 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-018 Preventive Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 09_0924 Worksheet modified to reflect External Audit recommendation for identification of "Cause for Potential Nonconformance". Minor editing changes. 11_0414 Added Preventive Action Number block to match Q-Pulse

215

May 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Actions 1 Standards Actions 1 New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2

216

Climate Action Plan (Kentucky)  

Energy.gov (U.S. Department of Energy (DOE))

The Commonwealth of Kentucky established the Kentucky Climate Action Plan Council (KCAPC) process to identify opportunities for Kentucky to respond to the challenge of global climate change while...

217

SEAB Climate Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

A presentation on the Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy.

218

Workforce Diversity Action Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley...

219

ARM - Submitting Proposals : Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

govField CampaignsSubmitting Proposals : Guidelines govField CampaignsSubmitting Proposals : Guidelines Schedule and Availability Preproposals now open for AMF and AAF Preproposals due 1 Feb Invited full proposals due 1 May AAF available Dec 2015 AMF1 available Apr 2016 AMF2 available early 2017 AMF3 available for guest instrumentation or intensive operational periods Forms Propose a Campaign Form Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps to Send Campaign Data to ARM Data Archive Field Campaign Guidelines (PDF, 1.1MB) Submitting Proposals : Guidelines Proposals are welcome from all members of the scientific community for conducting field campaigns and scientific research using the ARM Climate Research Facility sites at the Southern Great Plains (SGP), North Slope of Alaska (NSA), Tropical Western Pacific (TWP), one of the ARM Mobile

220

Guidance Regarding Actions That May Proceed During the National Environmental Policy Act (NEPA) Process: Interim Actions (6/17/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exhibit 3 Exhibit 3 Steps to Follow for Determining Whether Actions May Proceed During the NEPA Process: Interim Actions Would the Interim Action Prejudice the Ultimate Programmatic Decision (i.e., would it tend to determine subsequent development or Limit alternatives)? Is the Proposed Interim Action Within the Scope of a Programmatic or Project-Specific EIS that is Being Prepared? Is the EIS Programmatic in Nature? (If proposed interim action is covered by a CX or EA/FONSI,see footnote 4, page 4, of text) Provisions of 40 CFR 1506.1 Do Not Apply: Follow Normal DOE NEPA Review and Documentation Procedures No Yes No No Would the Interim Action Have An Adverse Impact? Would the Interim Action Limit the Choice of Reasonable Alternatives (e.g., by level of resources

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

30-Day Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}. DATES: Comments regarding this collection must be received on or before [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. If you anticipate that you will be submitting comments, but find it difficult

222

30-Day Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}. DATES: Comments regarding this collection must be received on or before [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. If you anticipate that you will be submitting comments, but find it difficult

223

Proposed Rules Federal Register  

NLE Websites -- All DOE Office Websites (Extended Search)

information that it is making available about the liquid-immersed distribution transformer equipment classes that were analyzed in a previously issued notice of proposed...

224

2014 Coal Form Proposals  

U.S. Energy Information Administration (EIA)

Coal Survey Form Changes Proposed for 2014. The U.S. Energy Information Administration (EIA) has begun the process of re-clearing the coal survey ...

225

ARM - AAF Proposal Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Process Science (PDF) Baseline Instruments Campaign Instruments Instrumentation Workshop 2008 AAF Fact Sheet G-1 Fact Sheet Images Field Campaigns AAF Campaigns...

226

SPPR Group Proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Proposal June 23, 2010 Agenda Purpose of Meeting Presenters Background Information  Three Terminal Plan & Market Access  Business Case  Transmission Infrastructure Program ED5-Palo Verde Project Potential Rate Impacts Discussion / Comments 2 Purpose of Meeting Provide background information Share the SPPR Group's current proposal and how it might affect Parker-Davis Project (P-DP) customers Obtain your feedback on the proposal 3 Presenters Background Information - Todd Rhoades ED5-PV Project Description - Todd Rhoades Project Marketability - John Steward Project Cost & Financing - Jack Murray Potential Rate Impacts - Jack Murray Next Steps - Todd Rhoades 4 Three Terminal Plan November 2009 5 Business Case

227

Proposal Review Panel Descriptions  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Review Panel Descriptions Proposal Review Panel Descriptions To ensure competent scientific review, a proposal may be assigned to a different panel (at the discretion of the Review Panel Chair), or the panel may seek additional ad hoc reviews from other experts. High-Pressure This panel reviews scattering and diffraction proposals that focus on materials at high pressure. Techniques such as (but not limited to) diffraction, nuclear resonant scattering, and inelastic x-ray scattering for materials at high pressure are appropriate for this panel to consider. Instrumentation This panel reviews proposals related to the development of beamline instrumentation, sample environments, x-ray optical components, and/or detectors that are relevant to synchrotron radiation research. This panel

228

2013 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity Survey Form Changes in 2013 The U.S. Energy Information Administration (EIA) proposed changes to its electricity data collection in 2013. These changes involve three forms: Form EIA-861, "Annual Electric Power Industry Report" The addition of a new form, the Form EIA-861S, "Annual Electric Power Industry Report (Short Form)" Form EIA-923, "Power Plant Operations Report." The proposals were initially announced to the public via a Federal Register Notice published March 15, 2012. Comments regarding this proposed information collection were due by May 14, 2012. EIA reviewed all comments and made several revisions to the proposals as a result. A second Federal Register Notice was published on August 30, 2012. It outlined the proposals

229

Klickitat Cogeneration Project : Final Environmental Assessment.  

SciTech Connect

To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

United States. Bonneville Power Administration; Klickitat Energy Partners

1994-09-01T23:59:59.000Z

230

BS.l Actions to Conserve Energy-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BS.l Actions to Conserve Energy- BS.l Actions to Conserve Energy- Revision 0 Sitewide Categorical Exclusion for Actions to Conserve Energy Introduction As defined in the U.S. Department of Energy's (DOE) Richland Operations Office L11tegrated Management System Procedure, NEPA Analysis at Hanford, a sitewide categorical exclusion is: An application of DOE categorical exclusions described in 10 CFR 1021, Appendices A and B, which may apply to Hanford Site proposed actions (activities) that are "sitewide" in nature and extent, which the cognizant DOE Hanford NCO has determined fit within the scope (i.e., same nature and intent, and of the same or lesser scope) of DOE categorical exclusions described in 10 CFR 1021 Appendices A and B. The cognizant DOE Hanford NCO may issue specific sitewide

231

Proposed Technical Specification Amendment  

E-Print Network (OSTI)

This letter provides the final revised Technical Specification (TS) pages for the subject proposed TS amendment. In Reference 1 Duke Energy requested an amendment to the Catawba Nuclear Station Facility Operating Licenses and Technical Specifications (TS). The proposed amendment revises various TS that are affected by the revised heatup, cooldown, critically, and inservice test pressure and temperature (P/T) limits for the reactor coolant system (RCS) of each unit. The proposed amendment also revised the TS requirements for the low temperature overpressure protection (LTOP) system for each unit. www. duke-energy. corn

D. M. Jamil; Duke Power

2004-01-01T23:59:59.000Z

232

Proposed WSRC Clearance Modifications  

SciTech Connect

Westinghouse Savannah River Company proposes to modify criteria used for releasing material from Savannah River Site radiological areas to other SRS areas and for releasing material from SRS for uncontrolled use.

Crase, K.W.

2002-12-18T23:59:59.000Z

233

October 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Actions 1 Standards Actions 1 New Projects and DOE Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program

234

Standards Actions, July 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Program Document Status 07-01-2002 Activity Summary In Conversion - 4 In Preparation - 46 Out for Comment - 14 Published this Month - 2 5-year Review Status Revision in Progress - 11 Reaffirmation in Progress - 12 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 19 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Re- cently Sent for Coordination 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- July 2002 Standards Actions DOE Technical Standards Projects Initiated

235

Corrective Action Glossary  

SciTech Connect

The glossary of technical terms was prepared to facilitate the use of the Corrective Action Plan (CAP) issued by OSWER on November 14, 1986. The CAP presents model scopes of work for all phases of a corrective action program, including the RCRA Facility Investigation (RFI), Corrective Measures Study (CMS), Corrective Measures Implementation (CMI), and interim measures. The Corrective Action Glossary includes brief definitions of the technical terms used in the CAP and explains how they are used. In addition, expected ranges (where applicable) are provided. Parameters or terms not discussed in the CAP, but commonly associated with site investigations or remediations are also included.

Not Available

1992-07-01T23:59:59.000Z

236

EA-1870: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

70: Mitigation Action Plan 70: Mitigation Action Plan EA-1870: Mitigation Action Plan Utah Coal and Biomass Fueled Pilot Plant, Kanab, UT The Department of Energy (DOE) issues this Mitigation Action Plan (MAP) in conjunction with its Finding of No Significant Impact as to the department's proposed action of providing costshared funding for the Utah Coal and Biomass Fueled Pilot Plant Project. Based on the analyses in the Environmental Assessment (DOE/EA-1870), DOE determined that its proposed action allowing Viresco Energy, LLC (Viresco) to use federal funding to design, construct and operate a coal and biomass gasification pilot plant (pilot plant) - would not result in any significant environmental impacts. The pilot plant would evaluate the technical feasibility of using steam hydrogasification to convert coal and biomass (such as agricultural

237

Microsoft Word - CX-BentonCoPUD-FinleySubstationMeterProject_FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

John Roeder John Roeder Contractor - TEP-CSB-1 Proposed Action: Revenue Meter Replacement at Benton County Public Utility District's (PUD) Finley Substation PP&A Project No: 2594 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: Benton County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace an existing JEM1 revenue meter with a new JEMStar revenue meter within an existing meter rack at Benton County PUD's Finley Substation. BPA would own the rack and meter. No ground disturbance or alteration to the meter house would occur. Findings: BPA has determined that the proposed action complies with Section 1021.410 and

238

May 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2

239

MITIGATION ACTION PLAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MITIGATION ACTION PLAN MITIGATION ACTION PLAN KEMPER COUNTY IGCC PROJECT KEMPER COUNTY, MISSISSIPPI U.S. Department of Energy National Energy Technology Laboratory September 2010 2 INTRODUCTION The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County IGCC Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. DOE prepared this MAP in accordance with 10 CFR § 1021.331. PURPOSE Section 1021.331 of the DOE regulations implementing NEPA (10 CFR Part 1021) provides

240

Climate Action Plan (Maine)  

Energy.gov (U.S. Department of Energy (DOE))

In June 2003, the Maine State Legislature passed a bill charging the Department of Environmental Protection (DEP) with developing an action plan with the goal of reducing greenhouse gas (GHG)...

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Climate Action Plan (Delaware)  

Energy.gov (U.S. Department of Energy (DOE))

The Delaware Climate Change Action Plan (DCCAP) was prepared with funding from the Delaware State Energy Office and the U.S. Environmental Protection Agency’s State and Local Climate Change Program...

242

Climate Action Plan (Maryland)  

Energy.gov (U.S. Department of Energy (DOE))

On April 20, 2007, Governor Martin O’Malley signed Executive Order 01.01.2007.07 establishing the Maryland Climate Change Commission (MCCC) charged with collectively developing an action plan to...

243

Interim Action Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interim Action Determination Interim Action Determination Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site The Department of Energy (DOE) is preparing the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS, DOE/EIS-0283-S2). DOE is evaluating alternatives for disposition of non-pit plutonium that is surplus to the national

244

Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.  

SciTech Connect

In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

245

A Proposed Architecture  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposed Proposed Architecture for the NLC Diagnostic Regions Peter Tenenbaum, for the Diagnostic Region Group LCC-Note-0011 Draft 5-February-1999 1 introduction The NLC Main Linac CD-1 design contains 4 diagnostic regions (injection, extraction, and at the junctions between supersectors); the injector and beam delivery regions contain additional diagnostic regions modelled on those in the main linac, and one additional region may be added to the main linac (at the 330 GeV point, halfway through the third supersector). Each diagnostic region must support a variety of different beam measuring and manipulating tasks. In this Note we propose an overall architecture which permits all of these requirements to be met. 2 Requirements The main linac diagnostic regions must provide the following: * Beam position monitors for use by the conventional fast feedback system, and actuators (DC

246

2014 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for 2014 The U.S. Energy Information Administration (EIA) is proposing changes to its electricity data collection in 2014. These changes involve the following surveys: Form EIA-63B, "Annual Photovoltaic Cell/Module Shipments Report," Form EIA-411, "Coordinated Bulk Power Supply Program Report," Form EIA-826, "Monthly Electric Utility Sales and Revenue Report with State Distributions," Form EIA-860, "Annual Electric Generator Report," Form EIA-860M, "Monthly Update to the Annual Electric Generator Report," Form EIA-861, "Annual Electric Power Industry Report," Form EIA-861S, "Annual Electric Power Industry Report (Short Form)," and

247

Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.  

DOE Green Energy (OSTI)

CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundations for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.

United States. Bonneville Power Administration; Klickitat County (Wash.)

1995-09-01T23:59:59.000Z

248

DOE/EIS-0285-SA-137: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Chemawa-Salem 1&2 (4/1/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7- Chemawa-Salem1&2) 7- Chemawa-Salem1&2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Chemawa-Salem #1 115 kV and #2 230 kV transmission lines from Chemawa Substation to Salem Substation. Location: The project is located in the BPA Eugene Region, Marion County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-

249

(DOE/EIS-0285/SA-122): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CSB-2 CSB-2 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-122- Bonneville-Alcoa Ed Tompkins, TFO/LMT Proposed Action: Vegetation Management for the Bonneville-Alcoa 115kV transmission line Location: The project is located in the BPA Olympia Region in Skamania and Clark Counties, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans

250

Olympic voting system proposal  

Science Conference Proceedings (OSTI)

In an effort to address the contentious issue of judged Olympic events, the Olympic committee has proposed a pilot audience participation system to score the gymnastics and diving competitions in the upcoming 2004 Athens Summer Games. The system would ... Keywords: Olympics usability, audience, design methodology, ergonomics, industrial design, interaction design, interactive, interface, voting

Seamus Costello; Kari Kubala; Matt Turley; Mehmet Uzer

2004-04-01T23:59:59.000Z

251

NSLS Committees | Proposal Oversight Panel  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Oversight Panel Charge Assume responsibility for completing any missing third reviews of the regular Proposal Review Panels. Review proposals with large rating...

252

Proposals for Structural Biology Beamlines  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals for Structural Biology Beamlines Proposals for Structural Biology Beamlines Print Tuesday, 01 June 2010 09:52 Submit a New Proposal for Structural Biology Beamlines...

253

Microsoft Word - CX-MalinBusFY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Bob Trismen Project Manager - TEP-CSB-1 Proposed Action: Malin Substation relay equipment replacements PP&A Project No.: 2504 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic equipment Location: Klamath County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to replace bus differential relays and associated electronic equipment inside an existing building at the BPA Malin Substation. The replacements are scheduled to be completed in January 2013. Findings: BPA has determined that the proposed action complies with Section 1021.410 and

254

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18954 18954 Vol. 76, No. 66 Wednesday, April 6, 2011 DEPARTMENT OF ENERGY 5 CFR Chapters XXIII and XXIV 10 CFR Chapters II, III, and X 18 CFR Chapter I 41 CFR Chapter 109 48 CFR Chapter 9 Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information; extension of public comment period. SUMMARY: On February 3, 2011, the Department of Energy (DOE) published a request for information (RFI) issued as part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review.'' This document announces that the period for submitting reply comments is extended to April 15, 2011. The February 3 document incorrectly published in the Notices section of the Federal Register.

255

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31548 31548 Vol. 77, No. 103 Tuesday, May 29, 2012 DEPARTMENT OF ENERGY 5 CFR Chapter XXII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Notice of extension of public comment period. SUMMARY: This notice announces that the period for submitting comments on the Department of Energy's (DOE) request for information (RFI) issued as part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' is extended to June 19, 2012. DATES: DOE will accept comments, data, and information regarding the RFI received no later than June 19, 2012. ADDRESSES: Interested persons are encouraged to submit comments, identified by ''Regulatory Burden RFI,'' by any of the following methods:

256

Proposed Rules Federal Register  

NLE Websites -- All DOE Office Websites (Extended Search)

43015 43015 Vol. 77, No. 141 Monday, July 23, 2012 DEPARTMENT OF ENERGY 10 CFR Part 431 [Docket No. EERE-2010-BT-STD-0027] RIN 1904-AC28 Energy Conservation Standards for Commercial and Industrial Electric Motors: Public Meeting and Availability of the Preliminary Technical Support Document AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Notice of public meeting and availability of preliminary technical support document. SUMMARY: The U.S. Department of Energy (DOE or Department) will hold a public meeting to discuss and receive comments on the following: the equipment classes DOE plans to analyze for the purpose of amending energy conservation standards for certain commercial and industrial electric motors under section 342(b) of the

257

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

75798 75798 Vol. 76, No. 233 Monday, December 5, 2011 DEPARTMENT OF ENERGY 5 CFR Chapter XXIII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information. SUMMARY: As part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is seeking comments and information from interested parties to assist DOE in reviewing its existing regulations to determine whether any such regulations should be modified, streamlined, expanded, or repealed. The purpose of DOE's review is to make the agency's regulatory program more effective and less burdensome in achieving its

258

Microsoft Word - CX-Paisley_Meter_08Aug2013.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Robert Trismen Project Manager -TEP-CSB-1 Proposed Action: Paisley Geothermal Integration Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: Lake County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to integrate Surprise Valley Electrification Corporation's (SVEC) 3.65-megawatt Paisley Geothermal Project into BPA's balancing authority (BA) in response to a SVEC small generator interconnection request. The proposed point of interconnection would be at SVEC's existing Paisley Substation. In order to integrate the proposed geothermal generation project, BPA would provide and review metering drawings,

259

Action-Oriented Benchmarking:  

NLE Websites -- All DOE Office Websites (Extended Search)

Feb-2008 submitted to Energy Engineering Feb-2008 submitted to Energy Engineering Action-Oriented Benchmarking: Concepts and Tools Evan Mills, Paul Mathew & Mary Ann Piette, Lawrence Berkeley National Laboratory Norman Bourassa & Martha Brook, California Energy Commission ABSTRACT Most energy benchmarking tools provide static feedback on how one building compares to a larger set of loosely similar buildings, without providing information at the end-use level or on what can be done to reduce consumption, cost, or emissions. In this article-Part 1 of a two-part series-we describe an "action-oriented benchmarking" approach, which extends whole-building energy benchmarking to include analysis of system and component energy use metrics and features. Action-oriented benchmarking thereby allows users to generate more meaningful

260

May 2010 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2010 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

May 2009 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2009 May 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

262

February 2009 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 2009 February 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

263

Standards Actions - April 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-28-2002 3-28-2002 Activity Summary In Conversion - 4 In Preparation - 44 Out for Comment - 13 Published this Month - 2 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 2 Supersedure in Progress - 6 Cancellation Pending - 8 Cancellation in Progress - 2 No Current Action - 35 Inside this issue: DOE Technical Standards Project Canceled 1 DOE Technical Standard Recently Sent for Coordination 1 DOE Technical Standards Re- cently Published 2 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- April 2002 Standards Actions DOE Technical Standards Project Canceled

264

July 2009 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

265

Maiden Wind Farm Draft Environmental Impact Statement  

SciTech Connect

In February 2001, Washington Winds Inc. (the project developer) submitted a proposal to Bonneville Power Administration (BPA) for a site north of the cities of Sunnyside and Prosser in Washington where wind power facilities could be developed. After considering preliminary information, BPA decided to examine the proposed project and consider purchasing and transmitting power from the project. The project developer also submitted Conditional use Permit (CUP) applications to Benton and Yakima Counties. Benton County, serving as the lead agency for the State Environmental Policy Act (SEPA), issued a Determination of Significance on June 11, 2001. The action proposed by BPA is to: (1) execute a 20-year power purchase agreement with the project developer for up to 50 average megawatts (aMW) (up to about 200 megawatts [MW]) of electrical energy from the proposed Maiden Wind Farm; and (2) execute construction and generation interconnection agreements with the project developer to integrate the power generated by the proposed Maiden Wind Farm into BPA's transmission system. The need for the proposed action arises primarily from BPA's statutory obligations and planning directives. BPA will consider the information in this Environmental Impact Statement (EIS), public comments, and other factors when deciding whether to purchase power from the proposed wind project and transmit it over BPA transmission lines. Benton and Yakima County Planning Departments will consider information in this EIS when deciding whether to grant a CUP and allow the proposed project to be developed.

N /A

2002-03-29T23:59:59.000Z

266

Unsolicited Proposals | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unsolicited Proposals Unsolicited Proposals Aviation Management Green Leases Executive Secretariat Energy Reduction at HQ Real Estate Approvals Documents and Publications...

267

EA-1592: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1592: Mitigation Action Plan Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant Based on the analysis in the Environmental Assessment prepared for the proposal by the GSA and NNSA, neither the construction nor operation of the selected alternative wouldhave significant environmental impact. This MAP contains mitigation and monitoring commitments for the project, including commitments set in permits for the new facility. Mitigation Action Plan for the Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant More Documents & Publications EA-1592: Finding of No Significant Impact

268

DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Initiates Enforcement Actions Against 4 Showerhead Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) March 7, 2010 - 3:41pm Addthis The Office of General Counsel has issued a Notice of Proposed Civil Penalty to Hudson-Reed Limited for failing to certify to DOE that showerheads manufactured or distributed within the United States meet the applicable water conservation standards as required by the Energy Policy and Conservation Act (EPCA) and DOE regulations. This Notice of Proposed Civil Penalty proposes payments to the government of $1,920,200. Under federal law, manufacturers of some products covered by EPCA are required to

269

EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

270

Final Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production DOE/EA-1532 June 2005 National Nuclear Security Administration Sandia Site Office P.O. Box 5400 Albuquerque, New Mexico 87185-5400 Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production i Final EA DOE/EA-1532 June 2005 TABLE OF CONTENTS 1.0 PURPOSE AND NEED FOR AGENCY ACTION ........................................................................ 1 2.0 NO ACTION AND PROPOSED ACTION ALTERNATIVES...................................................... 2 2.1 No Action Alternative....................................................................................... 5

271

Microsoft Word - Document1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grizzly Substation Fiber Optic Project Grizzly Substation Fiber Optic Project Finding of No Significant Impacts (FONSI) Summary: This notice announces BPA's decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The U. S. Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOEIEA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the U. S. Forest Service and BPA have determined that the Proposed Action is not a major Federal action significantly affecting the

272

Environmental Assessment Proposed Improvements at the Thomas Jefferson National Accelerator Facility Newport News, Virginia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

84 84 Environmental Assessment Proposed Improvements at the Thomas Jefferson National Accelerator Facility Newport News, Virginia June 2002 U. S. Department of Energy Oak Ridge Operations Oak Ridge, Tennessee DOE/EA-1384 i TABLE OF CONTENTS Executive Summary.....................................................................................................................1 1. INTRODUCTION..................................................................................................................... 6 1.1 PREVIOUS ACTIONS ............................................................................................................................................. 6 1.2 SCOPE OF THIS PROPOSED ACTION..............................................................................................................

273

May 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Revisions 1 DOE Technical Standards Projects Initiated 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 04-27-2005 Activity Summary In Conversion - 4 In Preparation - 25

274

SSRL- Proposal Review Panel  

NLE Websites -- All DOE Office Websites (Extended Search)

Stanford Synchrotron Radiation Lab Stanford Synchrotron Radiation Lab search Go [an error occurred while processing this directive] Proposal Review Panel Sub Panels Structural Molecular Biology & Biophysics Materials 1: Structure, Reactivity & Self-Assembly Materials 2: Electronic Properties, Magnetic Properties & Surface Science Molecular Environmental & Interface Science Membership Torgny Gustafsson Rutgers University Dept of Physics & Astronomy 136 Frelinghuysen Rd Piscataway NJ 08854-0849 Victor Henrich Yale University Dept of Applied Physics 327 Becton Center, 15 Prospect St. New Haven CT 06511 Christopher P. Hill University of Utah Biochemistry 15 N. Medical Dr. East, Rm 4100 Salt Lake City, UT 84112-5650 Franz Himpsel University of Wisconsin Dept of Physics 1150 University Avenue

275

Microsoft Word - CX_Memo_Amended_TVWD.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2013 9, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Julie Goodrich Project Manager - TERR-3 Proposed Action: Tualatin Valley Water District Waterline Land Use Review Request (update to previous Categorical Exclusion issued on December 31, 2012) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way Location: Washington County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to grant a Land Use Review Request (LURR) submitted by Tualatin Valley Water District (TVWD) to construct a portion of their proposed waterline on existing BPA fee-owned right-of-way (ROW) within BPA's Keeler-

276

Microsoft Word - CX-RockyReach-MapleValley_Bridge_FY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR-4 KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Ross Project Manager - TELF-TPP-3 Proposed Action: Rocky Reach-Maple Valley #1 Temporary Bridge Installation (116/4-117/1) PP&A Project No.: 2203 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance. Location: The project area is confined to the existing access road located to the south of the right-of-way corridor of Bonneville Power Administration's (BPA) Rocky Reach-Maple Valley 345-kV transmission line between miles 116-117. The proposed project, located in King County, Washington, is within BPA's Covington District. Proposed by: BPA Description of the Proposed Action: BPA is proposing to construct a temporary bridge over

277

Microsoft Word - UEC_LURR20130062_CX  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sandra Billings - TERR-FRANKLIN Sandra Billings - TERR-FRANKLIN Project Manager Proposed Action: Umatilla Electric Cooperative (UEC) use of right-of-way south of McNary Substation Land Use Review Request Case No.: 20130062 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple Use of Powerline Rights-of-Way Location: Umatilla, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to allow UEC to use 0.7 miles of BPA fee-owned right-of-way to construct a portion of a 3-mile, double-circuit 115-kV transmission line. The area has been previously disturbed by the construction of transmission lines and other utilities. UEC's proposed line would cross eight BPA transmission lines ranging in voltage from

278

Microsoft Word - KingEstate_LaneElectric_CX_RCT.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Robert C. Trismen Robert C. Trismen Project Manager - TEP-CSB-1 Proposed Action: King Estate Solar Project Integration Budget Information: Work Order 00218289, Task Number 1 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 - Additions/modifications to electric power transmission facilities within previously developed area. Location: Lane County, Oregon, southwest of Eugene, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to provide a meter and associated equipment to Lane Electric Cooperative (LEC) for installation at the King Estate Solar Photovoltaic Generation plant. BPA would pre-configure the meter and test, energize, commission, and calibrate the metering equipment. LEC would fund the proposed project; BPA

279

Microsoft Word - City_of_Sherwood_LURR_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2013 5, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Julie Goodrich Project Manager - TERR-3 Proposed Action: City of Sherwood Sewer Line Replacement Land Use Review Request Budget Information: 184006 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 4.9 Multiple use of powerline rights-of-way Location: Sherwood, Washington County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to approve a land use review request (LURR) submitted by the city of Sherwood (city) to replace a portion of its proposed sewer line within existing BPA fee-owned right-of-way (ROW) between structure 19/11 of BPA's Keeler-Oregon City No. 2 115-kilovolt (kV) transmission line and SW Tualatin-Sherwood Road. The city would replace

280

Microsoft Word - CX_Memo_TVWD.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2012 31, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Julie Goodrich Project Manager - TERR-3 Proposed Action: Tualatin Valley Water District Waterline Land Use Review Request Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way Location: Washington County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to grant a Land Use Review Request (LURR) submitted by Tualatin Valley Water District (TVWD) to construct a portion of their proposed waterline on existing BPA fee-owned right-of-way (ROW) within BPA's Keeler-Oregon City No.2 115-kilovolt (kV) transmission line corridor in the City of Beaverton,

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Microsoft Word - CX-Pearl-Keeler_ROW_Marking_10June2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rick Teiper Rick Teiper Project Manager - TERM-TPP-4 Proposed Action: Pearl-Keeler Right-of-Way (ROW) Marking Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance Location: Washington County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to survey and mark the Pearl-Keeler No. 1 transmission line ROW boundary in Washington County, Oregon. The installation of markers to demarcate BPA's ROW would prevent encroachment from homeowners and developers, ensure the safety of nearby residents, and allow for the continued safe maintenance and operation of BPA's transmission lines. The proposed Project would install yellow carsonite markers and monuments along an

282

Microsoft Word - Peninsula_Light_Co_L0308_Mod_CX_and_EnvCkLt.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel, Project Manager, TEP-TPP-1 Proposed Action: Peninsula Light Company Line and Load Interconnection Request L0308 (amendment to previous Categorical Exclusion issued on May 5, 2011) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.12 Construction of powerlines Location: Mason County, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes a modification to a tap line that would interconnect Peninsula Light Company (PLC) into BPA's Shelton-Kitsap #2 115-kV transmission line in Mason County, WA. The original proposal involved constructing the tap within existing BPA right-of-way (ROW), as described in the categorical exclusion issued

283

EA-1779: Proposed Changes to the Sanitary Biosolids Land Application  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: Proposed Changes to the Sanitary Biosolids Land 79: Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee EA-1779: Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee Summary This EA evaluates the environmental impacts of a proposal to amend (e.g., by changing setback requirements from surface water features and potential channels to groundwater) the Sanitary Biosolids Land Application Program at the Oak Ridge Reservation in Oak Ridge, Tennessee. Base on the analyses in the EA, DOE determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the context of NEPA, and that preparation of an environmental impact statement is not required.

284

Multi-Scale Action Effectiveness Research in the Lower Columbia River and Estuary, 2011 - FINAL ANNUAL REPORT  

SciTech Connect

The study reported here was conducted by researchers at Pacific Northwest National Laboratory (PNNL), the Oregon Department of Fish and Wildlife (ODFW), the University of Washington (UW), and the National Marine Fisheries Service (NMFS) for the U.S. Army Corps of Engineers, Portland District (USACE). This research project was initiated in 2007 by the Bonneville Power Administration to investigate critical uncertainties regarding juvenile salmon ecology in shallow tidal freshwater habitats of the lower Columbia River. However, as part of the Washington Memorandum of Agreement, the project was transferred to the USACE in 2010. In transferring from BPA to the USACE, the focus of the tidal freshwater research project shifted from fundamental ecology toward the effectiveness of restoration in the Lower Columbia River and estuary (LCRE). The research is conducted within the Action Agencies Columbia Estuary Ecosystem Restoration Program (CEERP). Data reported herein spans the time period May 2010 to September 2011.

Sather, Nichole K.; Storch, Adam; Johnson, Gary E.; Teel, D. J.; Skalski, J. R.; Bryson, Amanda J.; Kaufmann, Ronald M.; Woodruff, Dana L.; Blaine, Jennifer; Kuligowski, D. R.; Kropp, Roy K.; Dawley, Earl M.

2012-05-31T23:59:59.000Z

285

Proposal Team: C. Burger  

NLE Websites -- All DOE Office Websites (Extended Search)

COMPLEX MATERIALS SCATTERING ( ) COMPLEX MATERIALS SCATTERING ( ) Proposal Team: C. Burger 1 , K. Cavicchi 2 , E. DiMasi 3 , A. Fluerasu 3 , S. Fraden 4 , M. Fukuto 3 , O. Gang 3 , B.S. Hsiao 1 , R.J. Kline 5 , S. Kumar 6 , O. Lavrentovich 6 , B. Ocko 3 , R. Pindak 3 , M. Rafailovich 1 , R.A. Register 7 , S. Sprunt 6 , H.H. Strey 1 , B.D. Vogt 8 , W.-L. Wu 5 , L. Wiegart 3 , K.G. Yager 3 1 Stony Brook University, 2 University of Akron, 3 Brookhaven National Lab, 4 Brandeis University, 5 NIST, 6 Kent State University, 7 Princeton University, 8 Arizona State University TECHNIQUES AND CAPABILITIES KEY CONCEPTS SELECTED APPLICATIONS * Small- and wide-angle x-ray scattering on 3PW source, in transmission and reflection mode: USAXS, SAXS, WAXS, GISAXS, GIXRD * High-throughput x-ray scattering for intelligent exploration of vast parameter spaces

286

Proposed solar two project Barstow, California  

DOE Green Energy (OSTI)

This Environmental Assessment (EA) evaluates the environmental consequences of the proposed conversion and operation of the existing Solar One Facility in Daggett, Ca, near the city of Barstow, to a nitrate salt based heat transfer system, Solar Two. The EA also addresses the alternatives of different solar conversion technologies and alternative sites and discusses a no action alternative. A primary objective of the Solar Two Project is to demonstrate the technical and economic feasibility of a solar central receiver power plant using molten salt as the thermal storage and transport fluid medium. If successful, the information gathered from the Solar Two Project could be used to design larger commercial solar power plants.

Not Available

1994-01-01T23:59:59.000Z

287

Workforce Diversity Action Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley National Laboratory is principally an institution of scientific research, committed to addressing the needs of society. A diverse workforce is an invaluable asset to innovation and research excellence. To this end, we must embody the following principles to successfully affect the Laboratory's mission and embrace our diverse workplace community. We affirm the inherent dignity in all of us and strive to maintain an environment characterized by respect, fairness, and inclusion. Our valued community encompasses an array of races, creeds, and social circumstances. We recognize and cherish the richness contributed by our diversity.

288

Standards Actions, July 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-27-2001 6-27-2001 Activity Summary In Conversion - 4 In Preparation - 42 Out for Comment - 15 Published this Month - 1 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 2 Supersedure in Progress - 6 Cancellation Pending - 8 Cancellation in Progress - 2 No Current Action - 35 Inside this issue: DOE Technical Standards Project Initiated 1 DOE Technical Standard Recently Sent for Coordination 1 DOE Technical Standard Recently Published 1 American National Standards Institute 2 American National Standards 3 American Society for Testing and Materials 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. July 2001 Standards Actions DOE Technical Standards Projects Initiated

289

Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

212 212 Mitigation Action Plan for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory Departme~t of Energy Albuquerque Operations Office Los Alamos Area Office Los Alamos, New Mexico MITIGATION ACTION PLAN for the LEASE OF LAND FOR THE DEVELOPMENT OF A RESEARCH PARK AT LOS ALAMOS NATIONAL LABORATORY Background on the Lease of Land at Los Alamos National Laboratory: The U. S. Department of Energy (DOE) has approved an Environmental Assessment (EA) on the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory (LANL)(DOE/EA-1212), Los Alamos, New Mexico. The DOE released a Predecisional Draft of this EA for State and Tribal review and made the draft document available to the public on July 24, 1997 for

290

February 2001 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Technical Standards Program Document Status Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ Activity Summary In Conversion - 4 In Preparation - 35 Out for Comment - 18 Published this Month - 1 FY 2001 5-year Reviews Revisions in Progress - 2 Reaffirmations in Progress - 2 Supersedures in Progress - 6 Cancellations Pending - 11 Cancellations in Progress - 33 No Current Action - 16 DOE Technical Standards Project Canceled If you have any questions about this action, please contact the person listed be- low. The following DOE Technical Standards project was recently canceled: * EM Facility Hazard Categorization, Project Number SAFT-0029; EM Technical Standards Manager, John Serocki, 301-903-7999, John.Serocki@em.doe.gov, or Tom Wright, 301-903-3661, Tom.Wright@em.doe.gov. The need for this

291

April 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status

292

Remedial Action Performed  

Office of Legacy Management (LM)

General Motors Site in General Motors Site in Adrian, Michigan Department of Energy OiZce of Assistant Manager for Environmental Management Oak Ridge Operations January 2001 69 Printed on recycledhcydable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE GENERAL MOTORS SITE ADRIAN, MICHIGAN JANUARY 200 1 Prepared for United States Army Corps of Engineers Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES .............................................................................................................................................. TABLES ...............................................................................................................................................

293

February 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2

294

November 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical DOE Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Revisions 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association

295

April 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 Technical Standards Published 2 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical

296

Yakima Tributary Access and Habitat Program : Action Plan Final Report 2002.  

DOE Green Energy (OSTI)

This report covers activities conducted by the Yakima Tributary Access and Habitat Program under Bonneville Power Administration (BPA) grant project No. 2002-025-00 for fiscal year 2002. The Yakima Tributary Access and Habitat Program (YTAHP, Program) was organized to restore salmonid passage to Yakima tributaries that historically supported salmonids and improve habitat in areas where access is restored. Specifically, this program is designed to (a) screen unscreened diversion structures to prevent fish entrainment into artificial waterways; (b) provide for fish passage at man-made barriers, such as diversion dams, culverts, siphons and bridges; and (c) provide information and assistance to landowners interested in to contributing to the improvement of water quality, water reliability and stream habitat. The YTAHP developed from a number of groups actively engaged in watershed management, and/or habitat restoration within the Yakima River Basin. These groups include the Washington State Fish and Wildlife (WDFW), Kittitas County Conservation District (KCCD), North Yakima Conservation District (NYCD), Kittitas County Water Purveyors (KCWP), and Ahtanum Irrigation District (AID). The US Bureau of Reclamation (Reclamation) and Yakama Nation (YN) both participated in the development of the objectives of YTAHP. Other entities that will be involved during permitting or project review may include the YN, the federal Natural Resources Conservation Service (NRCS), the US Fish and Wildlife Service (USFWS), the National Marine Fisheries Service (NMFS), and US Army Corps of Engineers (COE). Achievements of YTAHP with BPA Action Plan funding during FY 2002 were to: (1) Establish contracts with RC&D and YTAHP participants. (2) Determine contract mechanism for MWH engineering services. (3) Provide engineering designs and services for 11 early action projects, including inverted siphons, pump and gravity diversion screening, diversion metering, rock weirs for improved fish passage, headgates and fishways. These designs were used to submit for project implementation funding through the WA Salmon Recovery Funding Board. (4) Complete 6 early action projects on Ahtanum Creek--One gravity diversion was replaced with a pump and pump end screen and 5 pump end screens were installed. (5) Conduct two topographic surveys--For the City of Yakima on the Fruitvale diversion for the North Yakima Conservation District to support the installation of a pumping plant which would eliminate the need to divert directly from the Naches River and build the gravel berm each year during low flows. For the Taylor Ditch system for the North Yakima Conservation District to support as feasibility of opening the ditch for habitat and at the same time maintaining irrigation deliveries. (6) Procure materials for use in future YTAHP projects, including siphon pipe, delivery pipe, rock, screens, and water meters. These materials will act as match and support the completion of these subsequent YTAHP projects. Overall, with broad agency support and Action Plan funding through BPA, the YTAHP has achieved substantial enhancements that support aquatic species and which will leverage subsequent work through engineering designs and materials. The program was also able to establish the personnel and equipment support for beginning the stream assessment process on tributaries in Yakima and Kittitas Counties. Completion of this year's effort has provided significant inroads to working on the private lands in two counties which will be vital to future efforts by YTAHP and others to protect and enhance Yakima River Basin habitat.

Myra, David (South Central Washington Resource Conservation and Development Council, Ellensburg, WA); Ready, Carol A. (Kittitas County Water Purveyors, Ellensburg, WA)

2003-04-01T23:59:59.000Z

297

Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada  

Science Conference Proceedings (OSTI)

This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

K. Campbell

2000-04-01T23:59:59.000Z

298

Microsoft Word - CX_Memo_WNP.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tim Wicks Tim Wicks Project Manager - TERR-Covington Proposed Action: Williams Northwest Pipeline Land Use Review Request Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way Location: King County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to grant a Land Use Review Request (LURR) submitted by Williams Northwest Pipeline (WNP) to replace a portion of their 10-inch diameter South Seattle 2454 loop natural gas pipeline within their existing easement on BPA fee-owned right-of-way (ROW) within BPA's Maple Valley-Echo Lake transmission line corridor in King County, Washington. Puget Sound Energy (PSE), the primary user of the

299

Microsoft Word - Alcoa_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mark Miller Mark Miller Account Executive, Long-term Sales and Purchases - PTL-5 Proposed Action: Alcoa Power Sales Contract Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.1 Contracts, policies, and marketing and allocation plans for electric power Location: Portland, OR and Ferndale, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to enter into a new power sales contract with Alcoa that would allow BPA to continue to provide service for Alcoa's Intalco Works, an existing aluminum smelter in Ferndale, Washington. Under an existing contract with Alcoa, BPA provided 320 average megawatts (aMW) of firm power to Alcoa from December 22, 2009 until October 1, 2012, and is currently providing 300 aMW through December 31, 2012.

300

Microsoft Word - CX-Rattlesnake-Garrison_ROW_Marking_06June2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2013 6, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum P. Hastings Project Manager - TERM-TPP-4 Proposed Action: Rattlesnake-Garrison Right-of-Way Marking Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance Location: Missoula County, Montana Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to survey and mark the Rattlesnake- Garrison transmission line right-of-way (ROW) boundary in Missoula County, Montana. The installation of signs to mark BPA's ROW would prevent encroachment from homeowners and developers, ensure the safety of nearby residents, and allow for the continued safe maintenance and operation of BPA's transmission lines.

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

(DOE/EIS-0285/SA-13): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/6/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3) 3) James Jellison - TFO/Olympia Region - Natural Resource Specialist Bill Erickson - TFP/Walla Walla Region - Natural Resource Specialist Proposed Action: Vegetation Management along the Naselle Tarlett #1 and #2 transmission line Right of Way (ROW). Location: The ROW is located in Pacific County, WA, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of

302

Microsoft Word - CX-AccessRoads-KingCoWA-FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2013 22, 2013 REPLY TO ATTN OF: KEPR-Covington SUBJECT: Environmental Clearance Memorandum Rick Ross Engineer - TELF-TPP-3 Proposed Action: Covington District Culvert Replacements Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B1.3, Routine Maintenance Location: King County, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to replace existing culverts at 12 access road stream crossings that present barriers to fish passage. These improvements will be made on BPA easement access roads within DNR owned and managed lands. BPA will make these improvements by installing new fish friendly culverts and/or bridges at each stream crossing. The current stream crossings do not meet DNR fish passage standards that will be in

303

Microsoft Word - CX-SpacerInsulatorRepProg3rd4thQtr2012FY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28, 2012 28, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Frank Weintraub Project Manager - TEP-TPP-1 Proposed Action: 2012 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1899 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: Various transmission lines located within BPA's Service Area. See Table 1 for locations of transmission lines. Description of the Proposed Action: In order to provide continued system reliability, BPA proposes to replace worn spacers and insulators along various transmission lines throughout BPA's service area.

304

Microsoft Word - ATT I205 Burton Road CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Tim Murray Project Manager - TELP-TPP-3 Proposed Action: AT&T Fiber Addition North Bonneville-Ross No. 2 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Fiber optic cable Location: Vancouver, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to allow AT&T to install an additional fiber optic line and vault within BPA's North Bonneville-Ross right-of-way easement and into an existing wireless communication facility. BPA has a commercial lease agreement with AT&T for co-location on its facilities and AT&T must request permission to update those facilities when they

305

Microsoft Word - CX-HorseRanchTap_FY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2013 7, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Dustin Liebhaber Project Manager - TELP-TPP-3 Proposed Action: Capacity Increase on Bonneville Power Administration's (BPA) Horse Ranch Tap Line PP&A Project No.: 2,707 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Snohomish County, Washington Proposed by: BPA Description of the Proposed Action: BPA proposes to install a new disconnect switch and associated modifications on the Horse Ranch Tap line in Snohomish County, Washington. BPA owns and maintains the line disconnect switch and the first 0.34 miles of the Tap line, while Puget Sound Energy (PSE) owns and operates the remaining 3.48 miles of the H-frame, wood

306

Microsoft Word - Bell-BoundaryFiber_CX_2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amanda Williams Amanda Williams Project Manager - TEP-TPP-3 Proposed Action: Bell-Boundary Fiber Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 - Fiber optic cable Location: Spokane and Pend Orielle counties, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to install new fiber optic line along 90 miles of existing BPA transmission lines in Spokane and Pend Orielle counties in Washington (see Figure 1). It would extend from Bell Substation in Spokane, WA to Boundary Substation 8 miles north of Metaline Falls, WA. The fiber would be strung on the Bell-Boundary No. 1 transmission line and run through Sacheen and Cusick substations along the route. BPA would install overhead fiber optic cable on existing towers or on fiber optic wood poles where

307

Microsoft Word - RattlesnakeButte_CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dorie Welch Dorie Welch Project Manager - KEWM-4 Proposed Action: Rattlesnake Butte Property Funding. Fish and Wildlife Project No.: 2011-003-00, Contract # BPA-006468 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation and wildlife management. Location: Monroe Quadrangle, in Lane County, Oregon (near Junction City, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to fund the Nature Conservancy (the Conservancy) to acquire 47 acres of land adjacent to a 50-acre parcel to create a total 97-acre parcel that will be known as Rattlesnake Butte. The Conservancy will provide BPA a conservation easement over the entire 97-acre property that will prevent habitat conversion and

308

Microsoft Word - BingenSwitchDisposition_CXMemo.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2012 7, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Realty Specialist - TERR-3 Proposed Action: Bingen Substation Sectionalizing Switches Disposition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Klickitat County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to sell two sectionalizing switches owned by BPA but located on PacifiCorp's Condit-Powerdale 69-kilovolt (kV) line in and adjacent to the Bingen Substation. BPA sold the Bingen substation to Klickitat County PUD in 1997 but retained ownership rights to inspect, maintain, repair, and replace its remaining revenue meters,

309

Microsoft Word - CX-McLoughlin_Meter_23July2013.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager -TERR-3 Proposed Action: McLoughlin Substation metering panel ownership transfer Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property transfers Location: Clackamas County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to transfer ownership of two interchange metering panels and associated hardware, which are located in the McLoughlin Substation control house, to Portland General Electric (PGE). In June 2013, BPA started removal of a transformer from the McLoughlin Substation to minimize the BPA footprint within the larger PGE

310

Microsoft Word - CLT_Tide_Creek_Land_Acquisition_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Jason Karnezis Jason Karnezis Project Manager - KEWL-4 Proposed Action: Tide Creek Property Funding Fish and Wildlife Project No. & Contract No.: 2010-073-00, BPA-006247 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management Location: T6N, R2W, S25 in Columbia County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund Columbia Land Trust (CLT) for the purchase of approximately 41 acres of historic Columbia River floodplain in Columbia County, Oregon. The CLT will own and manage the Tide Creek property for fish and wildlife conservation purposes and BPA will receive a conservation easement to ensure that the habitat

311

Microsoft Word - CX_Memo_Mason.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2012 5, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Robert Trismen Project Manager - TEP-CSB-1 Proposed Action: Mason Substation Metering Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic equipment. Location: Mason County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to remove existing equipment and install new revenue metering equipment in the existing Mason Substation. Mason County Public Utility District No. 3 (the District), a customer of BPA, owns and operates Mason Substation and plans to rebuild it as a 115/12.5 kV, 24 MVA facility. Mason Substation is a BPA Point of

312

Microsoft Word - CX_Memo_Fairmount.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager - TERR-3 Proposed Action: Fairmount Substation Equipment Acquisition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers. Location: Jefferson County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to a request by Jefferson County Public Utility District No.1 (Jefferson PUD), BPA is proposing to take ownership of equipment owned by Jefferson PUD within BPA's existing Fairmount Substation in Jefferson County, WA. Jefferson PUD, a Network Integration Customer of BPA, would sell its 115-kilovolt (kV) line terminal in Bay

313

CX-008880.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rudiger Krohn Rudiger Krohn Project Manager - TESF-CSB-2 Proposed Action: Celilo Converter Station Curtain Wall Replacement Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B1.3, Routine Maintenance Location: Wasco, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace an existing, leaking curtain wall on BPA's Celilo Converter Station to protect employees and equipment from water related injury and damage. The Celilo Converter Station, built in the late 1960s, is experiencing water infiltration through its existing curtain wall system. Water infiltration is a concern due to material damage, but also the threat to BPA operations and safety as posed by electrical shorts, wet floors, and mold.

314

(DOE/EIS-0285/SA-12): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2) 2) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Olympia-Grand Coulee No.1 Transmission Line ROW. Location: The ROW is located in Pierce and King Counties, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the

315

Microsoft Word - CX-Bell-Boundary_Well_FY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2011 4, 2011 REPLY TO ATTN OF: KEP-AMPN-2 SUBJECT: Environmental Clearance Memorandum Mari Rosales Realty Specialist - TERR-Bell-1 Proposed Action: Decommission ground water monitoring well located on Bonneville Power Administration (BPA) fee-owned property. PP&A Project No.: 2163 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B3.1 Site characterization and environmental monitoring Location: Section 27; Township 40N; Range 43E; WM; Pend Oreille, WA Proposed by: BPA Description of the Proposed Action: BPA proposes to allow Seattle City Light access to a BPA fee-owned right-of-way (ROW) for the purpose of decommissioning a Seattle City Light- owned well. Seattle City Light historically installed ground water monitoring wells as part of

316

Microsoft Word - CaptainJack_Olinda_CX_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2012 6, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cynthia Rounds Project Manager- TPC Proposed Action: Captain Jack-Olinda RAS LLL/LT Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.31 Installation or relocation of machinery and equipment Location: Olinda Substation, Shasta County, CA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund upgrades to BPA equipment at the Transmission Agency of Northern California 500-kilovolt (kV) Olinda Substation (also known as Vic Fazio Substation), which is operated and maintained by Western Area Power Administration (Western). BPA would fund Western to relocate existing and install new

317

Microsoft Word - CX-Monroe-Snohomish-ExpandedConductorReplacement_FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 13, 2013 June 13, 2013 REPLY TO ATTN OF: KEPR-Covington SUBJECT: Environmental Clearance Memorandum Frank Weintraub Mechanical Engineer - TEP-TPP-1 Proposed Action: Replacement of expanded conductor from Bonneville Power Administration's (BPA) Monroe Substation to structure 2/1 on the Monroe-Snohomish transmission line PP&A Project No.: 2682 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions/ modifications to transmission facilities Location: Snohomish County, Washingto.n, in BPA's Snohomish District Proposed by: BPA Description of the Proposed Action: BPA proposes to replace 2.5 inch expanded conductor from Monroe Substation to structure 2/1 on the Monroe-Snohomish 230-kilovolt transmission

318

Microsoft Word - CX_Memo_FranklinSubstation.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amy Freel Amy Freel Project Manager - TEP-TPP-1 Proposed Action: Franklin Substation Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Electrical power substations and interconnection facilities Location: Pasco, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA proposes to make improvements to the BPA fee-owned Franklin Substation located in southeastern Washington in order to bring the substation into compliance with BPA's minimum voltage guidelines. A shunt capacitor bank would be installed to provide voltage support. Project activities would include moving a temporary mobile capacitor bank, removing transformers, extending a 115-kilovolt (kV) bus, installing a new 115-kV

319

(DOE/EIS-0285/SA-14): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/6/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4) 4) Bill Erickson - TFP/ Walla Walla Region Natural Resource Specialist Proposed Action: Vegetation Management at the Teakean Butte Microwave site. Location: Clearwater County, ID, Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to remove 28 danger trees and dense brush from the microwave site in order to provide a 75 -80 foot safety buffer for fire control and Microwave Beam path. The work will protect BPA's investment at the site and provide system reliability. All work will be in accordance with the National Electrical Safety Code and BPA standards. Analysis: This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision

320

Microsoft Word - CX-RossTransformerOilTerminalUpgradeFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2012 4, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Ross Transformer Oil Terminal Upgrade Work Order #: 00298659 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6, Additions or modifications to electric power transmission facilities Location: Ross Complex, Township 2 North, Range 1 East, Section 14 of Clark County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install four new horizontal, double walled, 20,000 gallon insulating oil storage tanks at BPA's Ross Complex. In addition, BPA would install a railcar oil pumping and transfer system as well as a truck oil transfer pad. Both the

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Microsoft Word - CX_Memo_Lex-Del  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 2013 0 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager - TERR-3 Proposed Action: Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Cowlitz County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to transfer ownership of a portion of its existing Lexington-Delameter 115-kV transmission line to Cowlitz County Public Utility District No.1 (Cowlitz PUD) in Cowlitz County, WA. BPA would sell the first four spans of the line, from BPA's Lexington Substation to approximately 2,000 feet northwest to structure 30/8,

322

Microsoft Word - RailroadIsland_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Railroad Island Property Funding. Fish and Wildlife Project No.: 2011-003-00, Contract # BPA-006468 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation and wildlife management. Location: Monroe Quadrangle, in Lane County, Oregon (near Junction City, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA is proposing to fund The Mackenzie River Trust (the Trust) to acquire a 63-acre parcel that will be known as Railroad Island. The Trust will provide BPA a conservation easement over the entire 63-acre property that will prevent

323

Microsoft Word - CX_Memo_Kspell  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01, 2013 01, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Charla Burke Project Manager - TEP-TPP-1 Proposed Action: Kalispell Substation Shunt Capacitor Addition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Electric power substations and interconnection facilities Location: Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to expand the substation yard, install new equipment, and construct a new control house within BPA's existing 115-kilovolt (kV) Kalispell Substation in Flathead County, Montana. Existing low voltage conditions at Kalispell Substation could compromise system reliability in the event of a single line loss, which violates BPA steady-

324

Microsoft Word - PGE LURR - CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2012 8, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Monica Stafflund Realty Specialist - TERR-Chemawa Proposed Action: Portland General Electric (PGE) 13-kilovolt (kV) Overhead Electrical Line Land Use Review Request (LURR) Budget Information: 00184006, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way. Location: Township 7 south, Range 3 West, Section 17, Polk County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to allow PGE a 1-mile long, 20-foot wide easement on BPA fee-owned property for the purpose of constructing a new 13-kV power line parallel to BPA's existing Chemawa-Salem transmission line in Polk County, Oregon. Construction disturbance

325

Conforth Ranch (Wanaket) Wildlife Mitigation Project : Draft Management Plan and Draft Environmental Assessment.  

SciTech Connect

Bonneville Power Administration (BPA) proposes to mitigate for loss of wildlife habitat caused by the development of Columbia River Basin hydroelectric projects, including McNary dam. The proposed wildlife mitigation project involves wildlife conservation on 1140 hectares (ha)(2817 acres) of land (including water rights) in Umatilla County, Oregon. BPA has prepared an Environmental Assessment (EA)(DOE/EA- 1016) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

United States. Bonneville Power Administration; Confederated Tribes of the Umatilla Reservation, Oregon.

1995-03-01T23:59:59.000Z

326

Microsoft Word - CX_Memo_DouglasPUD_LURR.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Miroslava Rivera Miroslava Rivera Project Manager - TEP-TPP-1 Proposed Action: Douglas County Public Utility District (PUD) Fiber Land Use Review Request; Case # 20130491 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way Location: Douglas County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to approve a request from the PUD to use existing 4-inch conduit and two customer vaults at BPA's Columbia Substation to install 400 feet of fiber optic cable. The PUD is expanding their fiber system and would like to use existing facilities to the greatest extent possible to minimize disturbance. The PUD's fiber would enter BPA facilities from a structure on the Grant PUD Columbia-Rocky Ford 115-

327

Price/Cost Proposal Form  

NLE Websites -- All DOE Office Websites (Extended Search)

PRICECOST PROPOSAL FORM Page No. of NREL Solicitation Document Number: Offeror's Name and Address: Title of Proposed Effort and Task No., Phase No., or Project Total, As...

328

Original Workshop Proposal and Description  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop Proposal and Description Visualization Requirements for Computational Science and Engineering Applications Proposal for a DoE Workshop to Be Held at the...

329

Proposals for Structural Biology Beamlines  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals for Structural Biology Beamlines Print Submit a New Proposal for Structural Biology Beamlines Available Beamlines The beamlines suitable for structural biology...

330

Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

United States. Bonneville Power Administration.

1992-02-01T23:59:59.000Z

331

Canby Area Service Project substation and associated transmission line. Environmental Assessment  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

Not Available

1992-02-01T23:59:59.000Z

332

EA-1241: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41: Finding of No Significant Impact 41: Finding of No Significant Impact EA-1241: Finding of No Significant Impact Grizzly Substation Fiber Optic Project This notice announces BPA's decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The U. S. Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOEIEA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the U. S. Forest Service and BPA have determined that the Proposed Action is not a

333

Climate Action Plan (Manitoba, Canada)  

Energy.gov (U.S. Department of Energy (DOE))

Manitoba's Climate Action Plan centers around energy efficiency, although it includes mandates and initiatives for renewable sources of energy.

334

Proposed Energy Transport Corridors: West-wide energy corridor programmatic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Transport Corridors: West-wide energy corridor Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Map of the area covered by a programmatic environmental impact statement (PEIS), "Designation of Energy Corridors on Federal Land in the 11 Western States" (DOE/EIS-0386) to address the environmental impacts from the proposed action and the range of reasonable alternatives. The proposed action calls for designating more than 6,000 miles of energy transport corridors across the West. Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. More Documents & Publications

335

Remedial Action Performed  

Office of Legacy Management (LM)

Aliquippa Forge Site Aliquippa Forge Site in Aliquippa, Pennsylvania Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKE.~ FOR THE REMEDIAL ACTION PERFORMED AT THE ALIQUIPPA FORGE SITE IN ALIQUIPPA, PENNSYLVANIA NOVEMBER 1996 Prepared for . UNITED STATES DEPARTMENT OF ENERGY Oak Ridge Operations Office Under Contract No. DE-AC05-9 1 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES v . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TABLES vii . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii UNITSOFMEASURE ix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . INTRODUCTION xi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

336

Standards Actions, February 2004  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 DOE Technical Standards Recently Sent for Coordination 1 DOE Technical Standards Recently Published 1 Non-Government Standards 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 5 American Society for Testing and Materials (ASTM) 6 American Nuclear Society (ANS) 11 National Fire Protection Association (NFPA) 12 DOE Technical Standards Program Document Status 01-23-2004 Activity Summary In Conversion - 4 In Preparation - 36 Out for Comment - 23 Published in January - 3 5-year Review Status Revision in Progress - 13 Reaffirmation in Progress - 26 Cancellation Pending - 1 Cancellation in Progress - 3 No Current Action - 0 Inside This Visit the Technical Standards Program

337

Remedial Action Performed  

Office of Legacy Management (LM)

Baker and Williams Baker and Williams Warehouses Site in New York, New York, 7997 - 7993 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 7 995 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE BAKER AND WILLIAMS WAREHOUSES SITE IN NEW YORK, NEW YORK, 1991-1993 NOVEMBER 1995 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC05-910R21949 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 __ CONTENTS .- ~_- _- ..- ^_ FIGURES . ...,.,.....,,........,,.,_.....,.,.,.__,....,,,,, v TABLES ,.,__...,,....,..._._..,,,,_._...,.,.,,.,,,..._,,,, vi ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..v~

338

Remedial Action Performed  

Office of Legacy Management (LM)

' ' at the C. H. Schnoor Site, Springdale, Pennsylvania, in 1 994 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA, IN 1994 NOVEMBER 1996 prep&ed for United States Department of ~nergy Oak Ridge Operations Off= r Under Contract No. DE-AC05-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. '14501 CONTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi UNITS OF MEASURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii

339

April 2011 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3009 3009 Revision * DOE Standard 1066 Revision * New DOE Standards Projects * Incidents of Security Concern Technical Standard * Explosives Safety * Operations Assessment Field Handbook * Reporting of Radioactive Sealed Sources Program * Occurrence Reporting Causal Analysis Guide * Nuclear Safety-Related Standards Activity INSIDE THIS ISSUE April 2011 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE Standard 3009 Revision The Office of Nuclear Safety Policy and Assistance (HS-21), within the Office of Health, Safety and Security (HSS), conducted workshops in January and March to support a major revision of Department of Energy (DOE) Standard 3009, Preparation Guide for U.S. Department of Energy Nonreactor

340

Strategic Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Remedial Action Performed  

Office of Legacy Management (LM)

Alba Craft Laboratory and Alba Craft Laboratory and Vicinity Properties Site in Oxford, Ohio C Department of Energy Former Sites Restoration Division Oak Ridge Operations Office January 1997 $$@T Op% 3 @!B . i~d!l Ab Printed on recycled/recyclable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE FORMER ALBA CRAFT LABORATORY AND VICINITY PROPERTIES SITE IN OXFORD, OHIO JANUARY 1997 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC0591 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES .............................................................................................................................................. v TABLES.. .............................................................................................................................................. vi

342

VIOLENT FRAMES IN ACTION  

Science Conference Proceedings (OSTI)

We present a computational approach to radical rhetoric that leverages the co-expression of rhetoric and action features in discourse to identify violent intent. The approach combines text mining and machine learning techniques with insights from Frame Analysis and theories that explain the emergence of violence in terms of moral disengagement, the violation of sacred values and social isolation in order to build computational models that identify messages from terrorist sources and estimate their proximity to an attack. We discuss a specific application of this approach to a body of documents from and about radical and terrorist groups in the Middle East and present the results achieved.

Sanfilippo, Antonio P.; McGrath, Liam R.; Whitney, Paul D.

2011-11-17T23:59:59.000Z

343

EA-1456: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Mitigation Action Plan 6: Mitigation Action Plan EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado Western proposes to upgrade the existing 146 miles of CH-MM 115kB transmission line which crosses Carbon, Albany and Larmie Counties in Wyoming and 35 miles of the AU-CH transmission line which corsses portions of Laramie Counties, Wyoming and Weld County, Colorado. The upgrade would remove the existing 115-kV H-frame structures and replace them with new 230-Kv H-frame structures and single pole steel structures. Western also proposes to widen the existing right-of-way (ROW), where necessary to allow adequate electrical clearances. Mitigation Action Plan to Implement Mitigation Requirements for

344

EA-1755: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1755: Mitigation Action Plan Reconstruction of the South Access Road (CR 802) in Support of the Department of Energy, Waste Isolation Pilot Plant (WIPP) in Eddy County, New Mexico EA prepared for the proposed reconstruction of the Waste Isolation Pilot Plant (WIPP) South Access Road (County Road 802) located in Eddy County, New Mexico. Through the environmental review process, the Bureau of Land Management Carlsbad Field Office (BLM CFO) determined that there would be potential environmental impacts from the proposed project that would require mitigation to assure that the impacts would not become significant. Therefore, the Department of Energy Carlsbad Field Office (CBFO) prepared this Mitigation Action Plan (MAP) to establish conditions for issuing its

345

REMEDIAL ACTION PLAN  

E-Print Network (OSTI)

designated site consists of the 111-acre tailings pile, the mill yard, and piles of demolition rubble awaiting burial. The site contains 2.659 million cubic yards of tailings including 277,000 cubic yards of contaminated material in the mill yard, ore storage area, and Ann Lee Mine area; 151,000 cubic yards in the protore storage and leach pad areas; and 664,000 cubic yards of windblown contaminated soil, including excess soil that would result from excavation. Remedial action The remedial action will start with the excavation of windblown contaminated material and placement around the west, south, and east sides of the pile to buttress the slopes for increased stability. Most of the demolition rubble will be placed in the southern part of the pile and be covered with tailings. The northern part of the tailings pile (one million cubic yards) will then be excavated and placed on the south part of the pile to reduce the size of the disposal cell footprint. Demolition rubble that

Inactive Uranium; Mill Tailings Site; Uranium Mill Tremedial

1990-01-01T23:59:59.000Z

346

Improved Perturbation Theory for Improved Lattice Actions  

E-Print Network (OSTI)

We study a systematic improvement of perturbation theory for gauge fields on the lattice; the improvement entails resumming, to all orders in the coupling constant, a dominant subclass of tadpole diagrams. This method, originally proposed for the Wilson gluon action, is extended here to encompass all possible gluon actions made of closed Wilson loops; any fermion action can be employed as well. The effect of resummation is to replace various parameters in the action (coupling constant, Symanzik coefficients, clover coefficient) by ``dressed'' values; the latter are solutions to certain coupled integral equations, which are easy to solve numerically. Some positive features of this method are: a) It is gauge invariant, b) it can be systematically applied to improve (to all orders) results obtained at any given order in perturbation theory, c) it does indeed absorb in the dressed parameters the bulk of tadpole contributions. Two different applications are presented: The additive renormalization of fermion masses, and the multiplicative renormalization Z_V (Z_A) of the vector (axial) current. In many cases where non-perturbative estimates of renormalization functions are also available for comparison, the agreement with improved perturbative results is significantly better as compared to results from bare perturbation theory.

M. Constantinou; H. Panagopoulos; A. Skouroupathis

2006-05-31T23:59:59.000Z

347

Corrective Action Plan for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada  

Science Conference Proceedings (OSTI)

This corrective action plan proposes the closure method for the area 9 unexploded Ordnance landfill, corrective action unit 453 located at the Tonopah Test Range. The area 9 UXO landfill consists of corrective action site no. 09-55-001-0952 and is comprised of three individual landfill cells designated as A9-1, A9-2, and A9-3. The three landfill cells received wastes from daily operations at area 9 and from range cleanups which were performed after weapons testing. Cell locations and contents were not well documented due to the unregulated disposal practices commonly associated with early landfill operations. However, site process knowledge indicates that the landfill cells were used for solid waste disposal, including disposal of UXO.

Bechtel Nevada

1998-09-30T23:59:59.000Z

348

Is the Proposed Google Book Settlement "Fair"? Pamela Samuelson*  

E-Print Network (OSTI)

1 Is the Proposed Google Book Settlement "Fair"? Pamela Samuelson* Introduction Class action.1 The class at issue in the Authors Guild v. Google case now consists of all owners of copyrights settlement of the Authors Guild v. Google lawsuit.3 A ruling on this settlement is expected in the late

Sadoulet, Elisabeth

349

Mitigation Action Plans (MAP) and Related Documents | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1, 2010 December 1, 2010 EA-1782: Mitigation Action Plan University of Delaware Lewes Campus Onsite Wind Energy Project September 1, 2010 EIS-0409: Mitigation Action Plan Kemper County Integrated Gasification Combined Cycle Project, Kemper County, Mississippi August 24, 2010 EA-1736: Mitigation Action Plan Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia Canyon at Los Alamos National Laboratory, Los Alamos, Los Alamos, New Mexico July 10, 2010 EIS-0026: 2010 Annual Mitigation Report Waste Isolation Pilot Plant June 4, 2010 EA-1704: Mitigation Action Plan Construction and Operation of a Proposed Cellulosic Biorefinery, BlueFire Fulton Renewable Energy, LLC, Fulton, Mississippi January 1, 2010 EA-1755: Mitigation Action Plan

350

EA-1901: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Mitigation Action Plan 1: Mitigation Action Plan EA-1901: Mitigation Action Plan Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This Mitigation Action Plan (MAP) is referenced in the Finding of No Significant Impact for the Kootenai River White Sturgeon and Burbot Hatcheries Project (Department of Energy Environmental Assessment-1901). This MAP includes all of the mitigation measures recommended in the Final Environmental Assessment to mitigate adverse environmental impacts. It includes some measures that are essential to render the impacts of the Proposed Action not significant and other measures that will decrease impacts that did not reach a level to be considered significant. EA-1901-MAP-2013.pdf More Documents & Publications

351

EA-1706: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

706: Mitigation Action Plan 706: Mitigation Action Plan EA-1706: Mitigation Action Plan West Tennessee Solar Farm Project Haywood County, Tennessee Based on the analyses in the Environmental Assessment, DOE determined that its proposed action - allowing the State of Tennessee to use some of its State Energy Program funds appropriated in the American Recovery and Reinvestment Act to construct and operate the West Tennessee Solar Farm Project - would not result in any significant environmental impacts. Mitigation Action Plan for the West Tennessee Solar farm Project Haywood County, Tennessee, DOE/EA-1706 More Documents & Publications EA-1706: Finding of No Significant Impact EA-1706: Final Environmental Assessment 2012 Annual Planning Summary for Fossil Energy, National Energy Technology

352

January 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 12-27-2007 Activity Summary In Conversion - 4 In Preparation - 22 Out for Comment - 26 Published in December - 4 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/

353

November 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 10-29-2007 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 30 Published in October - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://hss.energy.gov/nuclear safetytechstds/

354

February 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 01-28-2008 Activity Summary In Conversion - 4 In Preparation - 22 Out for Comment - 24 Published in January - 3 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/

355

Microsoft Word - CX Tacoma Power Chehalis-Covington analog-digital conversion Final.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum John Brank Project Manager - TPC-OL Proposed Action: Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-kilovolt (kV) line/convert microwave signals from analog to digital Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: The BPA Chehalis-Covington project would take place at the Chehalis Substation, in Lewis County, WA, at the Covington Substation, in King County, WA and at Tacoma Power's (TPWR) South Tacoma Substation in Pierce County, WA. Proposed by: BPA Description of the Proposed Action: The BPA and TPWR have developed a joint plan to convert the microwave transfer trip signals

356

Tucannon River Spring Chinook Captive Broodstock Program Final Environmental Assessment and Finding of No Significant Impact  

SciTech Connect

Bonneville Power Administration (BPA) is proposing to fund the Tucannon River Spring Chinook Captive Broodstock Program, a small-scale production initiative designed to increase numbers of a weak but potentially recoverable population of spring chinook salmon in the Tucannon River in the State of Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-l326) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

N /A

2000-05-24T23:59:59.000Z

357

Mid-Columbia Coho Reintroduction Feasibility Project : Final Environmental Assessment and Finding of No Significant Impact.  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact.

United States. Bonneville Power Administration; Confederated Tribes and Bands of the Yakama Nation; Washington State Department of Fish and Wildlife

1999-04-01T23:59:59.000Z

358

Federal Energy Management Program: Energy Action Month  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Action Month to someone by E-mail Share Federal Energy Management Program: Energy Action Month on Facebook Tweet about Federal Energy Management Program: Energy Action Month...

359

DOE Institutes Enforcement Action against 4 Showerhead Manufacturers for  

NLE Websites -- All DOE Office Websites (Extended Search)

Institutes Enforcement Action against 4 Showerhead Institutes Enforcement Action against 4 Showerhead Manufacturers for Failure to Certify 116 Products DOE Institutes Enforcement Action against 4 Showerhead Manufacturers for Failure to Certify 116 Products January 28, 2010 - 1:49pm Addthis WASHINGTON DC - The Office of General Counsel has issued Notices of Proposed Civil Penalty to Zoe Industries, Altmans Products LLC, EZ-FLO International, and Watermark Designs, Ltd. for failing to certify to the Department of Energy that showerheads manufactured or distributed by these companies meet the applicable water conservation standard as required by the Energy Policy Conservation Act and DOE's regulations. These Notices of Proposed Civil Penalty collectively propose payments to the government of over $3 million. Unless the manufacturers settle these claims within

360

Standards Actions - January 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects Initiated Projects Initiated The following DOE Technical Standards projects were recently initiated. If you have any questions or are interested in participating in the development of these stan- dards, please contact the per- sons listed below. • Establishing and Maintaining a Facility Representative Pro- gram at DOE Facilities , Project Number MGMT-0003 (revision of DOE-STD-1063-97); David Compton, S-3.1, 202-586-1034, Fax 202-586-3472, David .Compton@hq.doe.gov. • Nuclear Explosive Safety Study Process, Project Number SAFT- 0074 (Revision of DOE-STD- 3015-97); Helmut Filacchione, DP-21, 301-903-7519, Fax 301- 903-8628, Helmut.Filacchione @hq.doe.gov. DOE Technical Standards Project Canceled The following DOE Technical Standards project was recently can- celed. If you have any questions about this action, please contact

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

January 2012 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

* DOE Conduct of Operations Standards Revisions * New DOE Standards Projects * DOE Handbook of Operational Safety and Analysis Techniques * Nuclear Safety- Related Standards Activity INSIDE THIS ISSUE January 2012 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE Conduct of Operations Standards Revisions In the early 1990s, the Department of Energy (DOE) developed 17 technical standards to support DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The standards (STDs), listed below, provided examples, good practices, and expanded explanations of the topics in each chapter of the Order. In June 2010, the Order was revised and issued as DOE Order 422.1, Conduct of Operations. The

362

Standards Actions - August 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Standards Technical Standards Program Document Status (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) Activity Summary In Conversion – 4 In Preparation – 32 Out for Comment – 15 Published this Month – 1 5-year Reviews Revisions in Progress – 3 Reaffirmations in Progress – 0 Supersedures in Progress – 6 Cancellations Pending – 8 Cancellations in Progress – 2 No Current Action – 35 Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ DOE Technical Standards Project Initiated If you have any questions or are interested in participating in the development of this standard, please contact the person listed below. Complete listings of all DOE Technical Standards projects and their status are given in the Web Site referenced at the bottom of this page. To access these

363

February 2013 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Standards Actions Technical Standards Program Newsletter U . S . D E PA R T M E N T O F O ffi ce O f nuclear SaFety ENERGY inSide thiS iSSue * Featured DOE Technical Standards Activities * DOE Technical Standards Cost- Savings and Access Improvement Initiative * Domestic and International Nuclear Energy Voluntary Consensus Standards Needs * Nuclear Safety- Related Standards Activity Featured dOe technical StandardS activitieS DOE Technical Standards Cost-Savings and Access Improvement Initiative By Helen Todosow, Brookhaven National Laboratory The Department of Energy (DOE) Technical Standards Managers (TSM) are actively exploring ways to save the government and tax payers' money while at the same time significantly improving efficiencies in access and use of voluntary consensus

364

Standards Actions, April 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Canceled Canceled The following DOE Technical Standards projects were recently canceled. If you have any questions about this action, please contact the persons listed below. • Accelerated Learning - A Systematic Approach, Project Number 6910-0061; Eula Baldwin, EH-31; 208-526-9472, egb@inel.gov. The need for this document no longer exists. • Environmental Safety and Health Configuration Guide, Project Number FACR-0013; Chan- dra S. Majumdar, EM-23; 301-903-7904, Fax 301-903-4423, Chandra.Majumdar @em.doe.gov. The need for a DOE Technical Standard on this matter no longer exists. • Occupational Safety and Health Handbook, Project Number HFAC-0011; Terry Krietz, EH-51; 301-903-6456, Fax 301-903-2239, Terry.Krietz@hq.doe.gov. The need for this document no longer exists.

365

Standards Actions - May 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Canceled Project Canceled The following DOE Technical Standards project was recently canceled. If you have any questions about this action, please contact the person listed below. • Equipment Qualification Program for DOE-Owned Nuclear Facilities and Operations, Project Number FACR-0012; Samuel Rosenbloom, EH-31; 301-903-5749, Fax 301-903- 8693, Samuel.Rosenbloom@eh.doe.gov. The need for this document no longer ex- ists. DOE Technical Standards Recently Published The following DOE Technical Standard has recently been published: • DOE-STD-1063-2000, Facility Representatives, March 2000. This document updates and supersedes DOE-STD-1063-97, October 1997. DOE employees and DOE contractors may obtain copies from the ES&H Technical Infor- mation Services, U.S. Department of Energy; 1-800-473-4375, Fax 301-903-9823.

366

Guam Energy Action Plan  

SciTech Connect

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

367

Standards Actions - August 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Standards Technical Standards Program Document Status (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) Activity Summary In Conversion – 4 In Preparation – 32 Out for Comment – 15 Published this Month – 1 5-year Reviews Revisions in Progress – 3 Reaffirmations in Progress – 0 Supersedures in Progress – 6 Cancellations Pending – 8 Cancellations in Progress – 2 No Current Action – 35 Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ DOE Technical Standards Project Initiated If you have any questions or are interested in participating in the development of this standard, please contact the person listed below. Complete listings of all DOE Technical Standards projects and their status are given in the Web Site referenced at the bottom of this page. To access these

368

EA-1628: Construction and Operation of a Proposed Lignocellulosic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

628: Construction and Operation of a Proposed Lignocellulosic 628: Construction and Operation of a Proposed Lignocellulosic Biorefinery, Emmetsburg, Iowa EA-1628: Construction and Operation of a Proposed Lignocellulosic Biorefinery, Emmetsburg, Iowa SUMMARY This EA evaluated the potential environmental impacts of a DOE proposal to provide financial assistance (the Proposed Action) to POET Project LIBERTY, LLC (POET) for the construction and operation of the lignocellulosic ethanol production facility (Project LIBERTY) near the City of Emmetsburg, Iowa. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 29, 2008 EA-1628: Finding of No Significant Impact Construction and Operation of a Proposed Lignocellulosic Biorefinery, POET Project LIBERTY, LLC, Emmetsburg, Iowa September 29, 2008

369

Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado: Revision 2  

SciTech Connect

The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment and a floodplain/wetlands assessment are included as part of this EA. This report and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

Not Available

1994-11-01T23:59:59.000Z

370

Environmental assessment of remedial action at the Maybell Uranium Mill Tailings Site near Maybell, Colorado. Revision 1  

SciTech Connect

The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

Not Available

1994-04-01T23:59:59.000Z

371

The art of proposal writing  

Science Conference Proceedings (OSTI)

This class covers general proposal writing for academic projects in two broad categories: research and education. It reviews the project concept, the search for an appropriate funding program, and development of a proposal based on a program announcement. ...

Barb Helfer; Steve Cunningham; Mike McGrath; Larry Rosenblum

2008-08-01T23:59:59.000Z

372

Meeting and Short Course Proposal  

Science Conference Proceedings (OSTI)

Share your knowledge and propose an AOCS Meeting or Short Course. Meeting and Short Course Proposal Meetings, Conferences and Short Courses aocs AOCS Annual Meeting & Expo Call for Papers Conferences Congress control dispersions edible exhibit exp

373

OVERVIEW OF PROPOSED TRANSPORTATION ENERGY  

E-Print Network (OSTI)

OVERVIEW OF PROPOSED TRANSPORTATION ENERGY ANALYSES FOR THE 2007 INTEGRATED ENERGY POLICY REPORT Jim Page, Malachi Weng-Gutierrez, and Gordon Schremp Fossil Fuels Office Fuels and Transportation....................................................................................................... 3 SUMMARY OF PROPOSED TRANSPORTATION ENERGY ANALYSES ............... 4 Background

374

(DOE/EIS-0285/SA-41): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 27, 2002 February 27, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-41) William Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management around wood poles in Transmission Line ROW's in the Walla Walla Region (see attached checklist for identification). The proposed work will be accomplished in the indicated sections of the transmission line corridors with the easement width ranging from 0 to 200 feet. Location: The ROWs are located in Walla Walla Region (see checklist). Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation around

375

Volatile organic compound remedial action project  

SciTech Connect

This Environmental Assessment (EA) reviews a proposed project that is planned to reduce the levels of volatile organic compound (VOC) contaminants present in the Mound domestic water supply. The potable and industrial process water supply for Mound is presently obtained from a shallow aquifer via on-site production wells. The present levels of VOCs in the water supply drawn from the on-site wells are below the maximum contaminant levels (MCLs) permissible for drinking water under Safe Drinking Water Act (SDWA; 40 CFR 141); however, Mound has determined that remedial measures should be taken to further reduce the VOC levels. The proposed project action is the reduction of the VOC levels in the water supply using packed tower aeration (PTA). This document is intended to satisfy the requirements of the National Environmental Policy Act (NEPA) of 1969 and associated Council on Environmental Quality regulations (40 CFR parts 1500 through 1508) as implemented through U.S. Department of Energy (DOE) Order 5440.1D and supporting DOE NEPA Guidelines (52 FR 47662), as amended (54 FR 12474; 55 FR 37174), and as modified by the Secretary of Energy Notice (SEN) 15-90 and associated guidance. As required, this EA provides sufficient information on the probable environmental impacts of the proposed action and alternatives to support a DOE decision either to prepare an Environmental Impact Statement (EIS) or issue a Finding of No Significant Impact (FONSI).

NONE

1991-12-01T23:59:59.000Z

376

Microsoft Word - CX-2013ElectronicEquipmentUpgrades_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 12, 2013 April 12, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Molly Kovaka Bob Trismen Contractor - TEP-CSB-2 Electrical Engineer - TEP-CSB-1 Proposed Action: Electronic Equipment Upgrades and Emergency Generator Replacements PP&A Project No: 2571 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment; B1.3 Routine maintenance activities Location: Multiple locations within Bonneville Power Administration's (BPA) service area. Proposed by: BPA Description of the Proposed Action: BPA proposes to upgrade electronic equipment required for operation of its transmission grid and replace emergency generators. Several types of actions involving communications, meters, relays, and Remedial Action Scheme (RAS) and Supervisory

377

California's Climate Change Proposed Scoping Plan | Open Energy Information  

Open Energy Info (EERE)

Climate Change Proposed Scoping Plan Climate Change Proposed Scoping Plan Jump to: navigation, search Name California's Climate Change Proposed Scoping Plan Agency/Company /Organization State of California Resource Type Publications, Lessons learned/best practices Website http://www.arb.ca.gov/cc/scopi Country United States Northern America References California's Climate Change Scoping Plan[1] Background "The Assembly Bill 32 Scoping Plan contains the main strategies California will use to reduce the greenhouse gases (GHG) that cause climate change. The scoping plan has a range of GHG reduction actions which include direct regulations, alternative compliance mechanisms, monetary and non-monetary incentives, voluntary actions, market-based mechanisms such as a cap-and-trade system, and an AB 32 program implementation regulation to

378

Libby-Troy Line Rebuild Project - July 25, 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Libby to Troy Rebuild Project 1 Libby to Troy Rebuild Project 1 Record of Decision July 2008 Bonneville Power Administration Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Record of Decision July 2008 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action with the Kootenai River Crossing realignment option that was identified in the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0379, May 2008). To implement this alternative, BPA will rebuild the 17-mile-long Libby-Troy section of the existing transmission line at the same voltage (115 kilovolt (kV)) with the same number of circuits (one). BPA will

379

ARM - Propose a Field Campaign  

NLE Websites -- All DOE Office Websites (Extended Search)

govCampaignsPropose a Campaign govCampaignsPropose a Campaign Schedule and Availability Preproposals now open for AMF and AAF Preproposals due 1 Feb Invited full proposals due 1 May AAF available Dec 2015 AMF1 available Apr 2016 AMF2 available early 2017 AMF3 available for guest instrumentation or intensive operational periods Forms Propose a Campaign Form Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps to Send Campaign Data to ARM Data Archive Field Campaign Guidelines (PDF, 1.1MB) Propose a Campaign : Preproposal Form Preproposals are short summaries of the proposed campaign and can originate with any scientist. Before you begin your preproposal, you should review the guidelines for submitting proposals. If you are preparing your preproposals locally on your computer, please

380

Multi-site Action Research .  

E-Print Network (OSTI)

??Classical action research within single organizations has become a well established and differentiated approach since its inception more than six decades ago. Although new larger… (more)

Fuller-Rowell, Thomas

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

JAS - a Java action semantics  

E-Print Network (OSTI)

Brown,D.F. Watt,D.A. Proceedings of 2nd International Workshop on Action Semantics pp 43-56 Dept of Computer Science, University of Aarhus

Brown, D.F.; Watt, D.A.

382

PROPOSAL  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydraulic Motion & Fluid Movement Hydraulic Motion & Fluid Movement RIO Technical Services Page 1 Department of Energy National Petroleum Technology Office Final Report Work Performed Under Contract Task 03NT30429 Sub-Task 2: Hydraulic Motion & Fluid Movement Through Small Diameter Pipes and Wellbores December 12, 2003 Prepared By: RIO Technical Services 4200 South Hulen, Suite 630 Fort Worth, Texas 76109 (817) 735-8264 NPTO Hydraulic Motion & Fluid Movement RIO Technical Services Page 2 TABLE OF CONTENTS Section 1.0 .............................................................................Introduction Section 2.0........................................................................Results& Findings 2.1..........Significant Parameters Affecting Efficient Cuttings Transport

383

PROPOSAL  

NLE Websites -- All DOE Office Websites (Extended Search)

Downhole Motors Downhole Motors Department of Energy National Petroleum Technology Office Final Report Work Performed Under Contract Task 03NT30429 Sub-Task 1: Current Capabilities of Hydraulic Motors, Air/Nitrogen Motors, and Electric Downhole Motors January 30, 2004 Prepared By: RIO Technical Services 4200 South Hulen, Suite 630 Fort Worth, Texas 76109 (817) 735-8264 RIO Technical Services Page 1 NPTO Downhole Motors TABLE OF CONTENTS Section 1.0................................................................................Introduction Section 2.0.................Brief History of Coil Tubing and Summary of Downhole Motors Section 3.0.....................................................................Results and Findings 3.1............Motors

384

Billy Shaw Dam and Reservoir : Environmental Assessment and Finding of No Significant Impacts.  

DOE Green Energy (OSTI)

This notice announces BPA`s decision to fund the construction, operation, and maintenance of the Billy Shaw Dam and Reservoir on the Duck Valley Reservation. This project is part of a continuing effort to address system-wide fish and wildlife losses caused by the development of the hydropower system in the Columbia River Basin. BPA has prepared an Environmental Assessment (EA) evaluating the potential environmental impacts of the proposed project. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

United States. Bonneville Power Administration; Shoshone-Paiute Tribes of the Duck Valley Reservation, Nevada.

1997-03-01T23:59:59.000Z

385

Microsoft Word - CX-Silver_Butte_28August2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 28, 2012 August 28, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Frank Weintraub Project Manager - TEP-TPP-1 Proposed Action: Silver Butte Fiber Burial Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B.47 Fiber Optic Cable. Location: Kootenai National Forest, Lincoln and Sanders County, Montana Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to bury an approximately 1-mile-long overhead fiber optic line (fiber) segment located along the Noxon-Libby transmission line. Under the Proposed Action, the fiber would be buried within the BPA right-of-way (ROW) and a U.S. Forest Service (USFS) access road. Past snow and ice loading along the segment has resulted in

386

(DOE/EIS-0285/SA-127): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP/4 KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-127- Eugene-Alvey#2 Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Eugene-Alvey 115 kV transmission line from structure 7/1 through structure 12/2m, and along portions of the following adjacent transmission lines: Hawkins-Alvey 115KV and Alvey-Lane 115KV. Location: The project is located in the BPA Eugene Region in Lane County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to

387

(DOE/EIS-0285-126): Supplement Analysis for the Transmission System Vegetation Management Program 2/19/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-4 KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-126- Alvey Fairview Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Alvey Fairview 230kV transmission line from structure 1/1 through structure 64/7. Location: The project is located in the BPA Eugene Region in Coos, Douglas, and Lane Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

388

DOE/EIS-0285-SA-136: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Oregon City-Chemawal 1&2 (4/1/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6- Oregon City-Chemawa1&2) 6- Oregon City-Chemawa1&2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Oregon City-Chemawa #1 and #2 115 kV transmission lines from Oregon City Substation to Chemawa Substation. Location: The project is located in the BPA Eugene Region, Washington and Marion Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that

389

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-141- SalemAlbany #2)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1- SalemAlbany #2) 1- SalemAlbany #2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Salem Albany #2 115 kV transmission line from Salem Substation to Albany Substation. Location: The project is located in the BPA Eugene Region, within Marion, Polk, and Benton Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission

390

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-140- SalemAlbany1)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0- SalemAlbany1) 0- SalemAlbany1) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Salem Albany #1 115 kV transmission line from Salem Substation to Albany Substation. Location: The project is located in the BPA Eugene Region, Marion, Linn, and Benton County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission

391

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2- KeelerOregon City #2) 2- KeelerOregon City #2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Keeler-Oregon City #2 115 kV transmission line from Keeler Substation to Oregon City Substation. Includes 5 miles of the St. Johns- Oregon City #2 69 kV transmission line. Location: The project is located in the BPA Eugene Region, Washington County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation via hand cutting along the right-of-way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with

392

Microsoft Word - BPA Personal Property.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy Office of Inspector General Office of Audit Services Audit Report Management Controls over the Bonneville Power Administration's Personal Property Accountability OAS-M-08-01 October 2007 Department of Energy vvasnlngron, UL LUSU:, October 1 , 2007 MEMORANDUM FOR TQ-YADMINISTRATOR, BONNEVILLE POWER ADNIINISTRATION [?L&& < / ( ' F'IIOM. or" Collard / Assistant Inspector General for Performance Audits Office of Inspector General INFORMATION: Audit Report on "Management Controls over the Bonneville Power Administration's Personal PI-opesly Accountability" Bonncvillc Power Administration (Bonnev~lle) is responsible for marketing, selling, and transniitting power produced from the Federal Columbia River Power System. To fuliill

393

FINAL Weatherford-BPA_Seismic.PDF  

NLE Websites -- All DOE Office Websites (Extended Search)

69 69 Weatherford Inclined Wellbore Construction Final Report for the Period May 9, 2002 - May 31, 2002 Date Published: August 19, 2002 R. Schulte PREPARED FOR THE UNITED STATES DEPARTMENT OF ENERGY/ROCKY MOUNTAIN OILFIELD TESTING CENTER Work Performed Under Rocky Mountain Oilfield Testing Center (RMOTC) CRADA No. 2002-016 Distribution A - Approved for public release; further dissemination unlimited (Unclassified) 1 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the U. S. Government nor any agency thereof, nor any of their employees, make any warranty, expressed or implied, nor assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process

394

Elliot Mainzer, BPA Ken Dragoon, NWPCCg  

E-Print Network (OSTI)

reduction equivalent to removing 1 million cars. ­ Nitrogen oxide emissions reduced 450 tons 6 NationalPossible increased wear and tear on balancing units, especially hydro. A better understanding of these impacts

395

PIA - Sunflower (BPA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009...

396

BIOMASS ACTION PLAN FOR SCOTLAND  

E-Print Network (OSTI)

BIOMASS ACTION PLAN FOR SCOTLAND #12; #12;© Crown copyright 2007 ISBN: 978 0 7559 6506 9 Scottish% recyclable. #12;A BIOMASS ACTION PLAN FOR SCOTLAND #12;#12;1 CONTENTS FOREWORD 3 1. EXECUTIVE SUMMARY 5 2. INTRODUCTION 9 3. WIDER CONTEXT 13 4. SCOTLAND'S ROLE IN THE UK BIOMASS STRATEGY 17 5. BIOMASS HEATING 23 6

397

NIST SBIR Proposals by State  

Science Conference Proceedings (OSTI)

NIST SBIR Phase I Proposals Received by State for FY1994 - FY 2013. STATE, FY94, FY95, FY96, FY97, FY98, FY99, FY00, ...

2013-07-25T23:59:59.000Z

398

Microsoft Word - Badger Canyon CXWEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEC-4 KEC-4 SUBJECT: Environmental Clearance Memorandum David Tripp Project Manager - TEP-CSB-1 Proposed Action: Badger Canyon Substation Radio Communication Tower Project Budget Information: Work Order 00253262 Task 03 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." B1.19 "Siting, construction, and operation of microwave and radio communication towers and associated facilities..." Location: Badger Canyon Substation, Benton County, Washington - Township 8 North, Range 28 East, Section 1 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace a 40-foot monopole communication

399

Microsoft Word - Esquatzel_Project_2011.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

James Hall James Hall Project Manager - TPC-TPP-4 Proposed Action: Esquatzel Project Budget Information: WO# 257267, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 "Acquisition, installation, operation, and removal of communication systems, data processing equipment, and similar electronic equipment." Location: Franklin County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to Green Energy Today's small generator interconnection request, BPA is planning to integrate their 1.1-MW Esquatzel Hydro Generation Project into its balancing authority (BA). The proposed point of interconnection is at Pole 66 G 1229 on the Bureau of Reclamation's

400

EA-1440-S1: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1440-S1: Mitigation Action Plan National Renewable Energy Laboratory's South Table Mountain Complex, Golden, Colorado ThIs Mitigation Action Plan implements the mitigation measures associated with the potential environmental impact of a DOE proposal that consists of three site development projects at the National Renewable Energy Laboratory's (NREL) South Table Mountain (STM) site at Golden, Colorado: Construction of the Research Support Facilities (RSF), a new office building or multi-building office complex; Installation of Phase 1 of planned Site Infrastructure Improvements (Phase 1 of Full Site Development); Upgrades to the Thermochemical User Facility (TCUF), TCUF High Bay area, and addition of the Thermochemical Biorefinery Pilot Plant

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Search for Chiral Fermion Actions on Non-Orthogonal Lattices  

E-Print Network (OSTI)

The graphene-inspired fermion actions recently proposed by Creutz and Borici have sparked interest in the use of non-orthogonal lattices in lattice QCD. These fermion actions have the desired chiral symmetry and have the minimal doubling required by the Nielsen-Ninomiya no-go theorem. However, due to the lack of discrete symmetries, radiative corrections in the gauged lattice theory will lead to the generation of unwanted relevant and marginal operators. Other similarly motivated non-orthogonal fermion actions avoid these unwanted operators, but introduce incorrect continuum behavior or excessive fermion doubling. A delicate balance of symmetry is required for chiral symmetry, minimal doubling, and no relevant operators, and to date, no non-orthogonal lattice action has accomplished this balance.

Michael I. Buchoff

2008-09-23T23:59:59.000Z

402

Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado: Remedial Action Selection Report. Preliminary final  

SciTech Connect

This proposed remedial action plan incorporates the results of detailed investigation of geologic, geomorphic, and seismic conditions at the proposed disposal site. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/waterborne materials to a permanent repository at the proposed Burro Canyon disposal cell. The proposed disposal site will be geomorphically stable. Seismic design parameters were developed for the geotechnical analyses of the proposed cell. Cell stability was analyzed to ensure long-term performance of the disposal cell in meeting design standards, including slope stability, settlement, and liquefaction potential. The proposed cell cover and erosion protection features were also analyzed and designed to protect the RRM (residual radioactive materials) against surface water and wind erosion. The location of the proposed cell precludes the need for permanent drainage or interceptor ditches. Rock to be used on the cell top-, side-, and toeslopes was sized to withstand probable maximum precipitation events.

Not Available

1994-03-01T23:59:59.000Z

403

Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado  

SciTech Connect

The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands assessment (Assessment 2) are included as part of this EA. The following sections and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service.

Not Available

1993-09-01T23:59:59.000Z

404

Feature Seeding for Action Recognition Pyry Matikainen Rahul Sukthankar  

E-Print Network (OSTI)

points (STIP) [15]. Note that we are not proposing a complete system for action recognition; we consider descriptors per frame of video, while STIP-HOF produces closer to 100 descriptors per frame. These descriptors (STIP-HOF). This method finds sparse interest points in space and time, and computes HOF descriptors

Guestrin, Carlos

405

G20 Anti-Corruption Action Plan Action Point 7: Protection of Whistleblowers  

E-Print Network (OSTI)

whistleblowers as one of the high priority areas in their global anticorruption agenda. Recognizing the importance of effective whistleblower protection laws, Leaders, in point 7 of the G20 Anti-Corruption Action Plan, called on G20 countries to lead by: To protect from discriminatory and retaliatory actions whistleblowers who report in good faith suspected acts of corruption, G-20 countries will enact and implement whistleblower protection rules by the end of 2012. To that end, building upon the existing work of organisations such as the OECD and the World Bank, G-20 experts will study and summarise existing whistleblower protection legislation and enforcement mechanisms, and propose best practices on whistleblower protection legislation. The G20 Anti-Corruption Working Group (AWG), in charge of carrying out the Action Plan assigned the OECD the task of preparing a concept note with proposals to implement this point. Following a discussion of the concept note at their meeting on 25-26 February 2010 in Paris, the G20 Members reiterated the value of a study of the main features of whistleblower protection frameworks currently in place in G20 countries, together with guiding principles and best

unknown authors

2010-01-01T23:59:59.000Z

406

Grizzly Substation Fiber Optics : Environmental Assessment.  

SciTech Connect

This notice announces BPA`s decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The US Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOE/EA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the US Forest Service and BPA have determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI. The US Forest Service has separately issued a FONSI and Decision Notice authorizing BPA to construct, operate, and maintain the Project within the Crooked River National Grassland (Grassland).

United States. Bonneville Power Administration.

1998-02-01T23:59:59.000Z

407

Action Item Review and Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Corporate Board Waste Corporate Board Action Items Action Item Resolution Action Item Strategic Planning Initiative Optimization Study Resolution Presentation by S. Schneider (HLW System Integrated Project Team) Pretreatment Whitepaper Presentation by W. Wilmarth (Role of Liquid Waste Pretreatment Technologies in Solving the DOE Clean-up Mission) Draft Charter for Performance Assessment Sub-Committee Presentation by J. Marra (Performance Assessment Community of Practice) Final Report from Slurry Transport Workshop In final stages of review and Approval; will be distributed when complete This document is intended for planning and analysis purposes, assuming a continuing constrained budget environment. Every effort will be made to comply with all applicable environmental and legal obligations,

408

Microsoft Word - FY13_Technology_Innovation_Portfolio_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Innovation - ST-3 Innovation - ST-3 Matt DeLong Contract Specialist for Technology Innovation Projects - NSSP-4 Proposed Action: FY 2013 Technology Innovation Portfolio Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B5.1 Actions to conserve energy or water; B3.6 Small-scale research and development, laboratory operations, and pilot projects Location: Portland, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund or partially fund various federal research laboratories, universities, utilities, companies, and research institutes to conduct research and develop pilot projects that promote energy efficiency and conservation in transmission infrastructure and power grid operations through BPA's Fiscal Year 2013

409

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

410

FINDING OF MD SIGNIFICANT IMPACT FORMERLY UTILIZED HED/AEC SITES REMEDIAL ACTION PROGRAM:  

Office of Legacy Management (LM)

FINDING OF MD SIGNIFICANT IMPACT FINDING OF MD SIGNIFICANT IMPACT FORMERLY UTILIZED HED/AEC SITES REMEDIAL ACTION PROGRAM: BAY0 CANYONS, NEW MEXICO Under the Formerly Utilized Sites Remedial Action Program (FUSRAP), the U.S. Department of Energy (DOE) has proposed to carry out rcmedfrl action at a site located in Bayo Canyon, Los Alamos County, New Mexico. Although the site as partially decontaminated and decommissioned in the 196Os, there remain above-background amounts of radionuclides. DOE has determined that strontium-90 in excess of DDE's proposed remedial- action criterir exists in subsurface materials underlying an area of about 0.6 ha (1.5 acres) at the Bayo Canyon site. The proposed action is to demarcate this are8 and restrict its use to activities that will not disturb this sub-

411

DOE/EIS-0285-SA-138: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (Raver-Echo Lake #1) (4/3/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 (Raver-Echo Lake #1 8 (Raver-Echo Lake #1 Don Atkinson Natural Resource Specialist - TFN/SNOHOMISH Proposed Action: Vegetation Management for portion of the Raver - Echo Lake #1 500 kV transmission line located from tower structure 4/1 to 13/1. Location: Project location is within King County, Washington and is within the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the right-of- way. BPA proposes to clear along access roads and remove danger trees outside the right-of-way where appropriate. Project is to remove vegetation that may impede the operation and maintenance of the subject transmission line. See Section 1.1 through 1.4 of the attached checklists for a complete description of the proposed action.

412

Microsoft Word - EchoPointCommunityWind_CX_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

James Hall James Hall Project Manager - TPC-TPP-4 Proposed Action: Integration of the Echo Point Community Wind Generation Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 - Electronic equipment Location: Umatilla County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to Echo Point Community Wind's (Echo Point's) small generator interconnection request, BPA proposes to integrate Echo Point's 10-megawatt wind generation project into its balancing authority (BA). The proposed point of interconnection is the Buttercreek Substation owned by the Umatilla Electric Cooperative (UEC). In order to integrate the proposed generation, BPA will install bi-directional generation metering at the Echo Point generation site.

413

Microsoft Word - Upper Jocko River Final Draft CX 7-15-2013.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upper Jocko River Property funding Upper Jocko River Property funding Fish and Wildlife Project No. and Contract No.: 2002-003-00, BPA-007168 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management Location: Township 16 North, Range 19 West, Section 10, Lake County, MT Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund the Salish and Kootenai Tribes for the purchase of 5 acres of property, referred to as the Upper Jocko River Land Acqusition in Lake County, MT. The Salish and Kootenai Tribes will own and manage the Upper Jocko River property for fish and wildlife conservation purposes and BPA will receive a conservation

414

MIDDLE PARK Conservation Action Plan  

E-Print Network (OSTI)

MIDDLE PARK Conservation Action Plan 2011 Update Plant Species of Focus: Kremmling milkvetch Conservation Initiative Workshop dates: June 26, 2008 and July 6, 2010 Report date: August 25, 2011 Middle Park................................................................................................................... 6 A. Conservation Targets

415

Climate Action Plan (New Hampshire)  

Energy.gov (U.S. Department of Energy (DOE))

29 members of Governor John Lynch’s Climate Change Policy Task Force developed a Climate Action Plan in 2009. It is aimed at achieving the greatest feasible reductions in greenhouse gas emissions...

416

Climate Action Plan (New Orleans)  

Energy.gov (U.S. Department of Energy (DOE))

New Orleans' Climate Action Plan will provide a road map to reach the City's greenhouse gas (GHG) reduction goal by 2030 while orchestrating its adaptation to climate change. The CAP will outline...

417

POST-REMEDIAL ACTION REPORT  

Office of Legacy Management (LM)

. . . . . . . . . . 3-1 Decontamination Techniques Used at the C. H. Schnoor Site, 12 3-2 Costs of theRemedia1 Action i t the C. H. Schnoor Site . . . . . . . . . . . 18 . . . . ....

418

ICDF Complex Remedial Action Report  

SciTech Connect

This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

W. M. Heileson

2007-09-26T23:59:59.000Z

419

Proposed Rules DEPARTMENT OF ENERGY  

NLE Websites -- All DOE Office Websites (Extended Search)

Register Vol. 77, No. 28 Friday, February 10, 2012 Proposed Rules DEPARTMENT OF ENERGY 10 CFR Part 431 Docket Number EERE-2010-BT-STD- 0048 RIN 1904-AC04 Energy...

420

Reducing Emissions Through Sustainable Transport: Proposal for a Sectoral  

Open Energy Info (EERE)

Reducing Emissions Through Sustainable Transport: Proposal for a Sectoral Reducing Emissions Through Sustainable Transport: Proposal for a Sectoral Approach Jump to: navigation, search Tool Summary Name: Reducing Emissions Through Sustainable Transport: Proposal for a Sectoral Approach Agency/Company /Organization: GTZ Sector: Energy Focus Area: Transportation Topics: Implementation, Pathways analysis Resource Type: Publications Website: www.transport2012.org/bridging/ressources/files/1/817,Transport_sector Reducing Emissions Through Sustainable Transport: Proposal for a Sectoral Approach Screenshot References: Reducing Emissions Through Sustainable Transport[1] Summary "The large mitigation potential and associated co-benefits of taking action in the land transport sector can be tapped into by a sectoral approach drawing financial resources from a transport window, in the short term

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Appliance Standards Program - The FY 2003 Priority Setting Report and Actions Proposed - Appendix C  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APPENDIX C: APPENDIX C: Data Sheets for New Products Table of Contents Product Page Product Page Commercial Refrigeration Miscellaneous Residential Equipment Standards Consideration C-1 Standards Consideration C-50 Beverage Merchandisers Test Procedure Summary C-3 Ceiling Fans Test Procedure Summary C-52 Standards Consideration C-4 Compact Audio Standards Consideration C-53 Ice Machines Test Procedure Summary C-6 Component Stereo and Rack Audio Standards Consideration C-54 Reach-In Freezers Standards Consideration C-7 Compact Audio, Component Stereo, and Rack Audio Test Procedure Summary C-55 Reach-In Refrigerators Standards Consideration C-9 Standards Consideration C-56 Reach-In Freezers/Refrigerators Test Procedure Summary C-11 Dehumidifiers

422

Appliance Standards Program - The FY 2003 Priority Setting Report and Actions Proposed -Appendix A  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A: A: Technical Support Document (TSD) Appendixes i A1 Introduction ........................................................................................ A1-1 A1.1 Methodology for Energy Consumption and Savings Estimate............... A1-2 A1.2 Energy Consumption and Savings Calculation Methodology ................ A1-3 A1.2.1 Device Annual Energy Consumption (AEC) Estimates ...........................A1-3 A1.2.1.1 Equipment Stock, S...................................................................................A1-4 A1.2.1.2 Usage Pattern ..........................................................................................A1-5 A1.2.1.3 Power draw by mode, P ...........................................................................A1-5 A1.2.2 Energy Savings Estimates

423

Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed - Appendix B  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APPENDIX B: APPENDIX B: Data Sheets for Existing Products Table of Contents Product Rulemaking Priority Page Product Rulemaking Priority Page Commercial Air-Cooled Central A/C & Air-Source HP, 65-240 kBtu/h Standards High B-1 High Intensity Discharge Lamps Determination High B-27 Central A/C & HP, 3 phase, < 65 kBtu/h Standards Medium B-2 Test Procedure Low B-28 Clothes Dryers Standards Low B-3 Lamps, Fluorescent Standards Low B-29 Test Procedure Low B-4 Test Procedure Low B-30 Clothes Washers Standards* Low B-5 Lamps, Incandescent General Service Standards Low B-31 Test Procedure* Low B-6 Test Procedure Low B-32 Commercial Water-Cooled A/C & Water- Source Heat Pumps Standards Low B-7 Lamps, Incandescent Reflector Standards Low B-33

424

Appliance Standards Program - The FY 2003 Priority Setting Report and Actions Proposed -Appendix A  

NLE Websites -- All DOE Office Websites (Extended Search)

A: A: Technical Support Document (TSD) Appendixes i A1 Introduction ........................................................................................ A1-1 A1.1 Methodology for Energy Consumption and Savings Estimate............... A1-2 A1.2 Energy Consumption and Savings Calculation Methodology ................ A1-3 A1.2.1 Device Annual Energy Consumption (AEC) Estimates ...........................A1-3 A1.2.1.1 Equipment Stock, S...................................................................................A1-4 A1.2.1.2 Usage Pattern ..........................................................................................A1-5 A1.2.1.3 Power draw by mode, P ...........................................................................A1-5 A1.2.2 Energy Savings Estimates

425

Implementation Proposal for the National Action Plan on Demand Response- July 2011  

Energy.gov (U.S. Department of Energy (DOE))

Report to Congress prepared by the staff of the Federal Energy Regulatory Commission (FERC) and the Department of Energy.

426

Baseline requirements of the proposed action for the Transportation Management Division routing models  

Science Conference Proceedings (OSTI)

The potential impacts associated with the transportation of hazardous materials are important to shippers, carriers, and the general public. This is particularly true for shipments of radioactive material. The shippers are primarily concerned with safety, security, efficiency, and equipment requirements. The carriers are concerned with the potential impact that radioactive shipments may have on their operations--particularly if such materials are involved in an accident. The general public has also expressed concerns regarding the safety of transporting radioactive and other hazardous materials through their communities. Because transportation routes are a central concern in hazardous material transport, the prediction of likely routes is the first step toward resolution of these issues. In response to these routing needs, several models have been developed over the past fifteen years at Oak Ridge National Laboratory (ORNL). The HIGHWAY routing model is used to predict routes for truck transportation, the INTERLINE routing model is used to predict both rail and barge routes, and the AIRPORT locator model is used to determine airports with specified criteria near a specific location. As part of the ongoing improvement of the US Department of Energy`s (DOE) Environmental Management Transportation Management Division`s (EM-261) computer systems and development efforts, a Baseline Requirements Assessment Session on the HIGHWAY, INTERLINE, and AIRPORT models was held at ORNL on April 27, 1994. The purpose of this meeting was to discuss the existing capabilities of the models and data bases and to review enhancements of the models and data bases to expand their usefulness. The results of the Baseline Requirements Assessment Section will be discussed in this report. The discussions pertaining to the different models are contained in separate sections.

Johnson, P.E.; Joy, D.S.

1995-02-01T23:59:59.000Z

427

Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed - Appendix B  

NLE Websites -- All DOE Office Websites (Extended Search)

APPENDIX B: APPENDIX B: Data Sheets for Existing Products Table of Contents Product Rulemaking Priority Page Product Rulemaking Priority Page Commercial Air-Cooled Central A/C & Air-Source HP, 65-240 kBtu/h Standards High B-1 High Intensity Discharge Lamps Determination High B-27 Central A/C & HP, 3 phase, < 65 kBtu/h Standards Medium B-2 Test Procedure Low B-28 Clothes Dryers Standards Low B-3 Lamps, Fluorescent Standards Low B-29 Test Procedure Low B-4 Test Procedure Low B-30 Clothes Washers Standards* Low B-5 Lamps, Incandescent General Service Standards Low B-31 Test Procedure* Low B-6 Test Procedure Low B-32 Commercial Water-Cooled A/C & Water- Source Heat Pumps Standards Low B-7 Lamps, Incandescent Reflector Standards Low B-33

428

Graphical Framework for Action Recognition using Temporally Dense STIPs Pradeep Natarajan  

E-Print Network (OSTI)

Graphical Framework for Action Recognition using Temporally Dense STIPs Pradeep Natarajan BBN and recognize a se- quence of actions. More recently, Spatio-temporal Interest Points (STIPs) have been proposed hand, Bag-of-words approaches using Spatio- temporal Interest Points (STIP) as the basic features

Southern California, University of

429

Recommendations on Alternative Actions for Analysis in Site-wide NEPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendations on Alternative Actions for Analysis in Site-wide Recommendations on Alternative Actions for Analysis in Site-wide NEPA Reviews Recommendations on Alternative Actions for Analysis in Site-wide NEPA Reviews The purpose o f this memorandum is t o recommend the treatment of the proposed action and the no action alternatives in site-wide National Environmental Pol icy Act (NEPA) reviews that are prepared for continuing and reasonably foreseeable future actions at Department o f Energy (DOE) sites. DOE prepares site-wide NEPA reviews in accordance with section 1021.331 o f the DOE NEPA Regulations (10 CFR Part 1021, published on April 24, 1992 at 57 F R 15122) to improve and coordinate agency plans, functions, programs, and resource utilization, among other reasons. Recommendations on Alternative Actions for Analysis in Site-wide NEPA

430

Microsoft Word - CX - Woodland 148.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Timothy Murray Timothy Murray Project Manager - TELP-TPP-3 Proposed Action: Woodland & 148 th Clearwire Wireless Communication Facilities Budget Information: Work Order #00241948, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Acquisition, installation, operation, and removal of communication systems... B1.19 Siting, construction, and operation of microwave and radio communication towers and associated facilities... Location: Towenship 19 North, Range 4 East, Section 20 in Pierce County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Clearwire Communications has requested to attach wireless communication facilities atop tower 50/2 of BPA's Chehalis-Covington #1

431

2014 Joint Action Workshop | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2014 Joint Action Workshop 2014 Joint Action Workshop January 12, 2014 8:00AM EST to January 14, 2014 5:00PM EST Palm Desert, California The Joint Action Workshop is an annual...

432

Enforcement actions: Significant actions resolved individual actions. Semiannual progress report, January 1997--June 1997  

SciTech Connect

This compilation summarizes significant enforcement actions that have been resolved during the period (January - June 1997) and includes copies of Orders and Notices of Violation sent by the Nuclear Regulatory Commission to individuals with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

NONE

1997-09-01T23:59:59.000Z

433

Environmental assessment of proposed geothermal well testing in the Tigre Lagoon Oil Field, Vermilion Parish, Louisiana  

DOE Green Energy (OSTI)

An environmental assessment is made of the proposed testing of two geopressured, geothermal aquifers in central coastal Louisiana. On the basis of an analysis of the environmental setting, subsurface characteristics, and the proposed action, potential environmental impacts are determined and evaluated together with potential conflicts with federal, state, and local programs. (LBS )

Not Available

1976-03-01T23:59:59.000Z

434

Proposal Calendar | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Calendar Proposal Calendar 2014 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends 2014-1 Fri Nov-1-13 Tue Nov-19-13 Tue Dec-10-13 ~Dec-18-13 Tue Jan-28-14 Tue Apr-21-14 2014-2 Fri Mar-7-14 Tue Mar-25-14 Tue Apr-8-14 ~Apr-21-14 ~ May-14 ~Aug-14 2014-3 Fri Jul-11-14 Tue Jul-29-14 Tue Aug-12-14 ~Aug-25-14 ~ Oct-14 ~Dec-14 2015 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends 2015-1 Fri Oct-31-14 Tue Nov-18-14 Tue Dec--2-14 ~Dec-14-14 ~Jan-15 ~Apr-15 2015-2 Fri Mar-6-15 Tue Mar-24-15 Tue Apr-7-15 ~Apr-20-15 ~ May-15 ~Aug-15 2015-3 Fri Jul-10-15 Tue Jul-28-15 Tue Aug-11-15 ~Aug-24-15 ~ Oct-15 ~Dec-15 2016 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends

435

Draft Supplement to the Environmental Statement Fiscal Year 1977 Proposed Program : Facility Location Evaluation for West Burley Service Study Area 75-9.  

SciTech Connect

Proposed is the construction of approximately 7 miles of 138-kV transmission line between the newly planned West Burley Substation (to be constructed by the customers) and BPA's Unity Substation, both near Burley, Idaho. In addition, new terminal facilities will be added to the Unity Substation. Depending upon the final route location chosen, between 7 and 8 miles of 138-kV line between West Burley Substation and Unity Substation would be required. Little or no new access road would be required under each of the alternatives. Other impacts would include slight disturbances to natural vegetation, cropland, and associated wildlife habitat. Disturbance of wildlife would be primarily restricted to the period during and immediately after construction. Visual impacts would also occur. Noise and other disturbances to residents will occur, primarily during construction.

United States. Bonneville Power Administration.

1975-12-15T23:59:59.000Z

436

Worldwide Energy Efficiency Action through Capacity Building...  

Open Energy Info (EERE)

Worldwide Energy Efficiency Action through Capacity Building and Training (WEACT) Jump to: navigation, search Logo: Worldwide Energy Efficiency Action through Capacity Building and...

437

Action Codes Table | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Safeguards System Action Codes Table Action codes *U.S.: **IAEA: A - Shipper's original data A B - Receiver's data accepting shipper's weights without measurement W C - Shipper's...

438

SEAB Climate Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy. Climate Action Plan (pdf) More Documents...

439

DOE Announces Additional Energy Efficiency Enforcement Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Additional Energy Efficiency Enforcement Action to Protect Consumers DOE Announces Additional Energy Efficiency Enforcement Action to Protect Consumers January 7, 2010 - 12:00am...

440

Renewable Energy Action Project | Open Energy Information  

Open Energy Info (EERE)

Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon Renewable Energy Action Project Jump to: navigation, search Name Renewable Energy Action...

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

United States. Bonneville Power Administration.

1996-08-01T23:59:59.000Z

442

Record of Decision - Klondike III/ Biglow Canyon Wind Integration Project - 10-25-06  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Klondike III/Biglow Canyon Wind Integration Project Klondike III/Biglow Canyon Wind Integration Project DECISION The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE) 1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects,

443

Microsoft Word - POTB_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaric H. Hsu, PMP Alaric H. Hsu, PMP Project Manager, TEP-CSB-2 Proposed Action: Integration of the Port of Tillamook Bay Generating Facility Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 - Electric equipment Location: Tillamook, Tillamook County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to the Port of Tillamook Bay's (POTB) Dairy Digestor Qualifying Facility's small generator interconnection request, BPA is planning to integrate their 1.2-megawatt biomass generation project into BPA's Balancing Authority. The proposed point of interconnection is Tillamook People's Utility District's (PUD) Feeder Circuit #41 at Tillamook PUD's Trask River Substation. In order to integrate the proposed generation,

444

Microsoft Word - CX-BigEddy-Redmond-ConductorMaintenance-FY13_WEB  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2013 4, 2013 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Stacy Hensley Project Manager - TEP-CSB-2 Proposed Action: Conductor maintenance on Bonneville Power Administration's (BPA) Big Eddy-Redmond transmission line Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: Approximately six miles southeast of The Dalles in Wasco County, Oregon. T1N, R14E, Sec 4, 5, 9, 20, 28, 29, and 33 Proposed by: BPA Description of the Proposed Action: BPA proposes to perform routine maintenance on the Big Eddy-Redmond, 230-kilovolt transmission line conductor. The proposed work includes re-sagging the transmission line, and replacing the transmission line hardware and transmission

445

Microsoft Word - Soos_Creek_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Timothy Wicks Timothy Wicks Realty Specialist - TERR-COVINGTON Proposed Action: Soos Creek Water & Sewer District Land Use Review Request Case No. 20120040 Budget Information: 184006 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 4.9 - Multiple use of powerline rights-of-way Location: Covington, King County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to approve a land use review request from Soos Creek Water & Sewer District (District) to construct a new sewer line that would cross under an existing road on BPA fee-owned property near structures 1/2 and 1/3 of the Covington-Maple Valley No. 2 230-kilovolt (kV) transmission line. The proposed sewer line

446

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-144-Custer-Intalco #2)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-Custer-Intalco #2) 4-Custer-Intalco #2) Don Atkinson Natural Resource Specialist - TFN/SNOHOMISH Proposed Action: Vegetation Management for portion of the Custer-Intalco #2 230 kV transmission line located from tower structure 1/1 to 7/5. Location: Project location is in BPA Snohomish Region in Whatcom County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the right-of- way, along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources present. Applicable findings and

447

Microsoft Word - NEPA_CX_WSDOT_LURR_No_20080504_SALE_North_Bonneville-Ross_ROW.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dawneen Dostert Dawneen Dostert Project Manager - TERR-LMT Proposed Action: Proposed Sale of Bonneville Power Administration (BPA) Fee Owned Property to Washington State Department of Transportation (WSDOT) for Interstate On and Off Ramps Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Vancouver, Clark County, WA, Township 2 North, Range 2 East, Section 28 and 21, Willamette Meridian Proposed by: Bonneville Power Adminitstration (BPA) Description of the Proposed Action: In response to a Land Use Review Request (LURR 20080504), BPA proposes to sell in fee 2.3 acres of land, located in Clark County, Washington, to WSDOT. The land consists of two strips within a residential area, located on either side of

448

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2002 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Snohomish - Murray #1 from str 1\4 to str 18\5. The proposed work will be to remove both danger and reclaim trees outside and inside the right-of-way, respectively. Right-of-way width varies from 125 to 300 feet. Location: The ROW is located in Snohomish County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to remove both reclaim and danger trees inside and outside the transmission line right of way. BPA crews or contract crews will cut only trees that have

449

Microsoft Word - CX-Sacajawea-SunHarborCascadeSteelTapPropertyTransferFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2012 20, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Realty Specialist - TERR-3 Proposed Action: Acquisition and Disposition of Property Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B1.24, Property transfers. Location: Walla Walla County, WA; Yamhill County, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to dispose of one property and acquire another property in its service territory: Sacajawea-Sun Harbor: BPA proposes to dispose of 2.02 miles of its Sacajawea-Sun Harbor 115-kilovolt (kV) transmission line, associated easement rights, and its Sun Harbor Substation to the Columbia Rural Electric Association (CREA). The transmission line and substation are

450

Microsoft Word - CX Memo Raver Control House.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joe Beebe Joe Beebe Project Manager - TESF-CSB-2 Proposed Action: Raver Substation-Control House Expansion & Seismic Retrofit Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Electric power substations and interconnection facilities Location: King County, Washington; Township 21 North, Range 7 East, Section 4&5 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Bonneville Power Administration (BPA) proposes to expand the control house at BPA fee-owned Raver Substation and seismically retrofit the existing structure. The control house expansion is proposed in order to install additional equipment racks and batteries needed to accommodate load growth in the south Puget Sound area. Because the expansion would

451

Microsoft Word - HardingFarms-CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2012 4, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dawneen Dostert - TERR-LMT Proposed Action: Clark County Harding Farms LURR Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way Location: Clark County, Washington - Township 3 North, Range 1 East, Section 25 and Vancouver Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to the Clark County Public Works (CCPW) Land Use Review Request (LURR), BPA proposes to grant Clark County two easements across BPA fee-owned parcel south of tower 4/5 of the Ross-Lexington 230-kV transmission line right-of-way. The proposal is necessary due to Clark County PUD's Harding Farms Storm Water and Wetland Improvements Project,

452

Microsoft Word - Longview_SewerMainProject_CX_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dawneen Dostert Project Manager - TERR-LMT Proposed Action: City of Longview Pump Stations and Force Main Project Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 - Multiple use of DOE powerline rights-of-way Location: Longview, Cowlitz County, Washington T7N, R2W, Section 5: T8N, R2W, Section 32: and T8N, R2W, Section 31 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to grant a multiple use request submitted by the City of Longview, Washington, to permanently install an underground sewer line and temporarily locate staging areas within a BPA transmission line right-of-way. The proposed

453

Microsoft Word - CX_Memo_RES-FGO.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Anna Cosola Anna Cosola Project Manager - TPC-TPP-4 Proposed Action: Revolution Energy Services (RES) Agriculture (Ag) - Forest Glen Oaks LLC Biomass Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.1 Contracts, policies, and marketing and allocation plans for electric power. Location: Yamhill County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to Forest Glen Oaks LLC's (FGO) small generator interconnection request, BPA proposes to integrate FGO's existing 370-kW biomass project into the Federal Columbia River Transmission System (FCRTS). The proposed point of receipt of the electricity generated from the RES Ag - FGO Biomass Project is the existing BPA-owned and operated 115-kV McMinnville Substation. In order to integrate the project,

454

Microsoft Word - MunroControlCenterExpansionCX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joseph Bebee TESF-CSB-2 Proposed Action: Munro Control Center Expansion Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.15 Support Buildings Location: Spokane, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The proposed project includes a 30,000 square foot (sf) expansion to the east side of the existing building and a total of 53,500 sf of additional paved surfaces for access roads and parking to the north. All proposed activities would be on previously disturbed BPA property. The expansion of the existing Munro Control Center is to provide an alternate facility that would support critical BPA functions in the case of a major

455

Microsoft Word - CX_2010_PSE_TransferAgreement.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steve Knudsen Steve Knudsen PTL-5 Proposed Action: Bonneville Power Administration (BPA) and Puget Sound Energy, Inc. (PSE) propose to enter into a new electricity transmission transfer agreement. Budget Information: WO# 00003863 Task# 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.8 - New electricity transmission agreements, and modifications to existing transmission arrangements, to use a transmission facility of one system to transfer power of and for another system, if no new generation projects would be involved and no physical changes in the transmission system would be made beyond the previously developed facility area. Location: Portland, Oregon Proposed by: BPA and PSE Description of the Proposed Action: BPA proposes to enter into a new electricity transmission

456

Microsoft Word - CX_Memo_Beck.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 07, 2013 January 07, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Robert Trismen Project Manager - TEP-CSB-1 Proposed Action: Beck Road Substation Meter Installation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic equipment. Location: Kootenai County, Idaho Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to provide and operate new revenue metering equipment in the Beck Road Substation. Kootenai Electric Cooperative (KEC), a network integration customer of BPA, would transfer approximately 4.5 megawatt of load from its Pleasant View Substation to its proposed facility, the new 115/12.47-kilovolt (kV), 15/20/25

457

Celilo Sub CX  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 2013 25, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Celilo Converter Station Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Electric power substations and interconnection facilities Location: The Dalles, Wasco County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade its Celilo Converter Station in The Dalles, Oregon. The converter station is reaching the end of its service life and has outdated technology and equipment that has resulted in ongoing reliability and maintenance issues. BPA proposes to perform upgrades to the station in order to improve reliability and to bring it up to current technical and

458

Microsoft Word - CX_Memo_RossMHQ.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Charles Fleischer Charles Fleischer Project Manager - NWM-4 Proposed Action: Ross Maintenance Headquarters Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.15 Support Buildings Location: Clark County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to build a new maintenance headquarters facility within BPA's existing Ross Complex in the City of Vancouver in Clark County, Washington. The proposed project would co-locate five maintenance groups currently located in disparate buildings throughout Ross Complex and enhance their operational effectiveness. Upon completion, the new facility would meet existing and future maintenance group needs for vehicle access and storage, materials and equipment handling, and enhance managerial oversight,

459

Microsoft Word - CX Memo Snohomish Control House_draft.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joe Beebe Joe Beebe Project Manager - TESF-CSB-2 Proposed Action: Snohomish Substation Control House Expansion & Seismic Retrofit Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Electric power substations and interconnection facilities Location: King County, Washington; Township 21 North, Range 7 East, Sections 4 & 5 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA proposes to expand the control house at the Snohomish Substation in Snohomish County, Washington within BPA's existing fee-owned parcel. The control house expansion is proposed in order to install additional equipment racks and batteries needed to accommodate load growth in the south Puget Sound area.

460

Microsoft Word - CX-Harbour_Pointe_130621  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2013 5, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Toni L. Timberman Project Manager - TSE-TPP-2 Proposed Action: Harbour Pointe Small Generator Integration Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: Mukilteo, Snohomish County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to integrate UniEnergy Technologies' (UET) 1.5-megawatt battery generation project into BPA's balancing authority (BA) in response to a UET small generator interconnection request. The proposed point of interconnection is at Snohomish Public Utility District's (SnoPUD) Harbour Pointe Substation. In order to integrate

Note: This page contains sample records for the topic "action bpa proposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Microsoft Word - SouthTacoma_CX_Updated.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Chad J. Hamel Project Manager, TEP-TPP-1 Proposed Action: South Tacoma-Frederickson Fiber Project (update to previous Categorical Exclusion issued on June 10, 2011) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 - Fiber Optic Cable Location: Pierce County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install fiber optic cable between BPA's South Tacoma Substation and the City of Tacoma's Frederickson Substation in Pierce County, Washington. The 1-mile long fiber optic cable would increase the reliability and redundancy of communications between the two substations. This project originally proposed a combination of overhead and buried

462

JGI - CSP Proposal Study Panel  

NLE Websites -- All DOE Office Websites (Extended Search)

User Programs User Programs Project Management Office Community Science Program Emerging Technologies Opportunity Program Technology Development Pilot Program Genomic Encyc. of Bacteria and Archaea MyJGI: Information for Collaborators The CSP Proposal Study Panel CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | Project Management | Forms | FAQ | People and Contacts Members Nina Agabian University of California, San Francisco, http://www.ucsf.edu Chris Amemiya Benaroya Research Institute at Virginia Mason, http://www.benaroyaresearch.org Gary L. Andersen Lawrence Berkeley National Laboratory, http://www.lbl.gov Jo Ann Banks Purdue University, http://www.purdue.edu John Battista Louisiana State University, http://www.lsu.edu Fred Brockman

463

III. Waiver of Proposed Rulemaking  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

382 Federal Register 382 Federal Register / Vol. 77, No. 241 / Friday, December 14, 2012 / Rules and Regulations technical errors in § 447.400(a) and § 447.405 listed on page 66701. One correction ensures consistency between two sentences in the same paragraph and the other restores text inadvertently omitted from the final rule that had been included in the May 11, 2012 notice of proposed rulemaking (77 FR 27671) on pages 26789-90. Thus, we are correcting page 66701 to reflect the correct information. III. Waiver of Proposed Rulemaking We ordinarily publish a notice of proposed rulemaking in the Federal Register to provide a period for public comment before the provisions of a rule take effect in accordance with section 553(b) of the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). However,

464

Hot Springs-Garrison Fiber Optic Project  

SciTech Connect

Bonneville Power Administration (BPA) is proposing to upgrade its operational telecommunications system between the Hot Springs Substation and the Garrison Substation using a fiber optic system. The project would primarily involve installing 190 kilometers (120 miles) of fiber optic cable on existing transmission structures and installing new fiber optic equipment in BPA`s substation yards and control houses. BPA prepared an environmental assessment (EA) evaluating the proposed action. This EA was published in October 1994. The EA identifies a number of minor impacts that might occur as a result of the proposed action, as well as some recommended mitigation measures. This Mitigation Action Plan (MAP) identifies specific measures to avoid, minimize, or compensate for impacts identified in the EA.

Not Available

1994-10-01T23:59:59.000Z

465

EA-1704: Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

Construction and Operation of a Proposed Cellulosic Biorefinery, BlueFire Fulton Renewable Energy, LLC, Fulton, Mississippi</