Powered by Deep Web Technologies
Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Resource Conservation and Recovery Act (RCRA)  

Science Conference Proceedings (OSTI)

This Resource Conservation and Recovery Act (RCRA) Facility Investigation Program Plan has been developed to provide a framework for the completion of RCRA Facility Investigations (RFI) at identified units on the Savannah Rive Site (SRS) facility. As such, the RFI Program Plan provides: technical guidance for all work to be performed, managerial control, a practical, scientific approach. The purpose of this Overview is to demonstrate how the basic RFI Program Plan elements (technical, management, and approach) are interwoven to provide a practical and workable plan. The goal of the RFI Program Plan is to provide a systematic, uniform approach for performance and reporting. In addition, the RFI Program Plan has been developed to be specific to the SRS facility and to adhere to the Environmental Protection Agency (EPA) RFI guidance received as part of the SRS. The US EPA publication Characterization of Hazardous Waste Sites'' has been liberally adapted for use in this RFI Program Plan.

Not Available

1989-06-30T23:59:59.000Z

2

RCRA facility assessments  

SciTech Connect

The Hazardous and Solid Waste Amendments of 1984 (HSWA) broadened the authorities of the Resource Conservation and Recovery Act (RCRA) by requiring corrective action for releases of hazardous wastes and hazardous constituents at treatment, storage, and disposal (TSD) facilities. The goal of the corrective action process is to ensure the remediation of hazardous waste and hazardous constituent releases associated with TSD facilities. Under Section 3004(u) of RCRA, operating permits issued to TSD facilities must address corrective actions for all releases of hazardous waste and hazardous constituents from any solid waste management unit (SWMU) regardless of when the waste was placed in such unit. Under RCRA Section 3008(h), the Environmental Protection Agency (EPA) may issue administrative orders to compel corrective action at facilities authorized to operate under RCRA Section 3005(e) (i.e., interim status facilities). The process of implementing the Corrective Action program involves the following, in order of implementation; (1) RCRA Facility Assessment (RFA); (2) RCRA Facility Investigation (RFI); (3) the Corrective Measures Study (CMS); and (4) Corrective Measures Implementation (CMI). The RFA serves to identify and evaluate SWMUs with respect to releases of hazardous wastes and hazardous constituents, and to eliminate from further consideration SWMUs that do not pose a threat to human health or the environment. This Information Brief will discuss issues concerning the RFA process.

NONE

1994-07-01T23:59:59.000Z

3

Resource Conservation and Recovery Act (RCRA). Facility Investigation Program Plan  

Science Conference Proceedings (OSTI)

This Resource Conservation and Recovery Act (RCRA) Facility Investigation Program Plan has been developed to provide a framework for the completion of RCRA Facility Investigations (RFI) at identified units on the Savannah Rive Site (SRS) facility. As such, the RFI Program Plan provides: technical guidance for all work to be performed, managerial control, a practical, scientific approach. The purpose of this Overview is to demonstrate how the basic RFI Program Plan elements (technical, management, and approach) are interwoven to provide a practical and workable plan. The goal of the RFI Program Plan is to provide a systematic, uniform approach for performance and reporting. In addition, the RFI Program Plan has been developed to be specific to the SRS facility and to adhere to the Environmental Protection Agency (EPA) RFI guidance received as part of the SRS. The US EPA publication ``Characterization of Hazardous Waste Sites`` has been liberally adapted for use in this RFI Program Plan.

Not Available

1989-06-30T23:59:59.000Z

4

HANFORD TANK FARM RESOURCE CONVERVATION & RECOVERY ACT (RCRA) CORRECTIVE ACTION PROGRAM  

SciTech Connect

As a consequence of producing special nuclear material for the nation's defense, large amounts of extremely hazardous radioactive waste was created at the US Department of Energy's (DOE) Hanford Site in south central Washington State. A little over 50 million gallons of this waste is now stored in 177 large, underground tanks on Hanford's Central Plateau in tank farms regulated under the Atomic Energy Act and the Resource, Conservation, and Recovery Act (RCRA). Over 60 tanks and associated infrastructure have released or are presumed to have released waste in the vadose zone. In 1998, DOE's Office of River Protection established the Hanford Tank Farm RCRA Corrective Action Program (RCAP) to: (1) characterize the distribution and extent of the existing vadose zone contamination; (2) determine how the contamination will move in the future; (3) estimate the impacts of this contamination on groundwater and other media; (4) develop and implement mitigative measures; and (5) develop corrective measures to be implemented as part of the final closure of the tank farm facilities. Since its creation, RCAP has made major advances in each of these areas, which will be discussed in this paper.

KRISTOFZSKI, J.G.

2007-01-15T23:59:59.000Z

5

Molten salt oxidation of mixed wastes: Separation of radioactive materials and Resource Conservation and Recovery Act (RCRA) materials  

Science Conference Proceedings (OSTI)

The Oak Ridge National Laboratory (ORNL) is involved in a program to apply a molten salt oxidation (MSO) process to the treatment of mixed wastes at Oak Ridge and other Department of Energy (DOE) sites. Mixed wastes are defined as those wastes that contain both radioactive components, which are regulated by the atomic energy legislation, and hazardous waste components, which are regulated under the Resource Conservation and Recovery Act (RCRA). A major part of our ORNL program involves the development of separation technologies that are necessary for the complete treatment of mixed wastes. The residues from the MSO treatment of the mixed wastes must be processed further to separate the radioactive components, to concentrate and recycle residues, or to convert the residues into forms acceptable for final disposal. This paper is a review of the MSO requirements for separation technologies, the information now available, and the concepts for our development studies.

Bell, J.T.; Haas, P.A.; Rudolph, J.C.

1993-12-01T23:59:59.000Z

6

Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant  

SciTech Connect

In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analyses and forms, inspection logs, equipment identification, etc.

Not Available

1994-05-01T23:59:59.000Z

7

SRS seeks RCRA Hazardous Waste Permit Renewal  

NLE Websites -- All DOE Office Websites (Extended Search)

ery Act (RCRA) permit be renewed. The current permit for the Mixed Waste Storage Buildings (MWSB), Mixed Waste Man- agement Facility (MWMF), and Sanitary Landfill (SLF)...

8

THE INTEGRATION OF THE 241-Z BUILDING DECONTAMINATION & DECOMMISSIONING (D&D) UNDER COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION & LIABILITY ACT (CERCLA) WITH RESOURCE CONSERVATION & RECOVERY ACT (RCRA) CLOSURE AT THE PLUTONIUM FINISHING PLANT (PFP)  

SciTech Connect

The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the ''Resource Conservation and Recovery Act of 1976'' (RCRA) and Washington State ''Hazardous Waste Management Act, RCW 70.105'', have been deactivated and are being actively decommissioned. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4, D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building. The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground mining from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential past-practice contamination identified during 241-Z closure, while outside the scope of the ''Hanford Facility Dangerous Waste Closure Plant, 241-Z Treatment and Storage Tanks''.

HOPKINS, A.M.

2007-02-20T23:59:59.000Z

9

NGLW RCRA Storage Study  

Science Conference Proceedings (OSTI)

The Idaho Nuclear Technology and Engineering Center (INTEC) at the Idaho National Engineering and Environmental Laboratory contains radioactive liquid waste in underground storage tanks at the INTEC Tank Farm Facility (TFF). INTEC is currently treating the waste by evaporation to reduce the liquid volume for continued storage, and by calcination to reduce and convert the liquid to a dry waste form for long-term storage in calcine bins. Both treatment methods and activities in support of those treatment operations result in Newly Generated Liquid Waste (NGLW) being sent to TFF. The storage tanks in the TFF are underground, contained in concrete vaults with instrumentation, piping, transfer jets, and managed sumps in case of any liquid accumulation in the vault. The configuration of these tanks is such that Resource Conservation and Recovery Act (RCRA) regulations apply. The TFF tanks were assessed several years ago with respect to the RCRA regulations and they were found to be deficient. This study considers the configuration of the current tanks and the RCRA deficiencies identified for each. The study identifies four potential methods and proposes a means of correcting the deficiencies. The cost estimates included in the study account for construction cost; construction methods to minimize work exposure to chemical hazards, radioactive contamination, and ionizing radiation hazards; project logistics; and project schedule. The study also estimates the tank volumes benefit associated with each corrective action to support TFF liquid waste management planning.

R. J. Waters; R. Ochoa; K. D. Fritz; D. W. Craig

2000-06-01T23:59:59.000Z

10

Calendar Year 2007 Resource Conservation and Recovery Act Annual Monitoring Report for the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee - RCRA Post-Closure Permit Nos. TNHW-113, TNHW-116, and TNHW-128  

SciTech Connect

This report contains groundwater quality monitoring data obtained during calendar year (CY) 2007 at the following hazardous waste treatment, storage, and disposal (TSD) units located at the US Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee; this S-3 Site, Oil Landfarm, Bear Creek Burial Grounds/Walk-In Pits (BCBG/WIP), Eastern S-3 Site Plume, Chestnut Ridge Security Pits (CRSP), Chestnut Ridge Sediment Disposal Baste (CRSDB), few Hollow Quarry (KHQ), and East Chestnut Ridge Waste Pile (ECRWP). Hit monitoring data were obtained in accordance with the applicable Resource Conservation and Recovery Act of 1976 (RCRA) hazardous waste post-closure permit (PCP). The Tennessee Department of Environment and Conservation (TDEC) - Division of Solid Waste Management issued the PCPs to define the requirements for RCRA post-closure inspection, maintenance, and groundwater monitoring at the specified TSD units located within the Bear Creek Hydrogeologic Regime (PCP no. TNHW-116), Upper East Fork Poplar Creek Hydrogeologic Regime (PCP no. TNHW-113), and Chestnut Ridge Hydrogeologic Regime (PCP no. TNHW-128). Each PCP requires the Submittal of an annual RCRA groundwater monitoring report containing the groundwater sampling information and analytical results obtained at each applicable TSD unit during the preceding CY, along with an evaluation of groundwater low rates and directions and the analytical results for specified RCRA groundwater target compounds; this report is the RCRA annual groundwater monitoring report for CY 2007. The RCRA post-closure groundwater monitoring requirements specified in the above-referenced PCP for the Chestnut Ridge Regime replace those defined in the previous PCP (permit no. TNHW-088), which expired on September 18, 2005, but remained effective until the TDEC issued the new PCP in September 2006. The new PCP defines site-specific groundwater sampling and analysis requirements for the CRSDB, CRSP, and KHQ that differ from those established under the expired PCP, including modified suites of laboratory analytes (RCRA groundwater target compounds) for each site and annual rather than semiannual sampling frequencies for the CRSDB and KHQ. The new PCP also specifies the RCRA post-closure groundwater monitoring requirements for the ECRWP, a closed TSD unit that was not addressed in the expired PCP.

Elvado Environmental

2008-02-01T23:59:59.000Z

11

Transportation of RCRA hazardous wastes. RCRA Information Brief  

Science Conference Proceedings (OSTI)

The Resource Conservation and Recovery Act (RCRA) and the Hazardous Materials Transportation Act (HMTA) regulate the transport of hazardous wastes. Under these statutes, specific pretransport regulatory requirements must be met by DOE before the shipment of hazardous wastes, including radioactive mixed wastes. The pretransport requirements are designed to help reduce the risk of loss, leakage, or exposure during shipment of hazardous materials and to communicate information on potential hazards posed by the hazardous material in transport. These goals are accomplished through the tracking of shipments, correctly packaging and labeling containers, and communicating potential hazards. Specific requirements include manifesting, packaging, marking and labeling waste packages; placarding transport vehicles; choosing appropriate waste transporters and shipment destinations; and record keeping and reporting. This information Brief focuses primarily on the transporter requirements both for transportation within a DOE facility and using a commercial transporter to transport RCRA hazardous wastes off-site.

Not Available

1994-04-01T23:59:59.000Z

12

RCRA corrective action determination of no further action  

SciTech Connect

On July 27, 1990, the U.S. Environmental Protection Agency (EPA) proposed a regulatory framework (55 FR 30798) for responding to releases of hazardous waste and hazardous constituents from solid waste management units (SWMUs) at facilities seeking permits or permitted under the Resource Conservation and Recovery Act (RCRA). The proposed rule, `Corrective Action for Solid Waste Management Units at Hazardous Waste Facilities`, would create a new Subpart S under the 40 CFR 264 regulations, and outlines requirements for conducting RCRA Facility Investigations, evaluating potential remedies, and selecting and implementing remedies (i.e., corrective measures) at RCRA facilities. EPA anticipates instances where releases or suspected releases of hazardous wastes or constituents from SWMUs identified in a RCRA Facility Assessment, and subsequently addressed as part of required RCRA Facility Investigations, will be found to be non-existent or non-threatening to human health or the environment. Such releases may require no further action. For such situations, EPA proposed a mechanism for making a determination that no further corrective action is needed. This mechanism is known as a Determination of No Further Action (DNFA) (55 FR 30875). This information Brief describes what a DNFA is and discusses the mechanism for making a DNFA. This is one of a series of Information Briefs on RCRA corrective action.

NONE

1996-06-01T23:59:59.000Z

13

Microsoft PowerPoint - RFA_EIA_conference_2009.ppt  

U.S. Energy Information Administration (EIA) Indexed Site

America's Ethanol Industry America's Ethanol Industry Our Energy Future Starts at Home About the RFA * The Renewable Fuels Association (RFA) promotes policies, regulations and research and development initiatives that will lead to the increased production and use of fuel ethanol. * RFA membership includes a broad cross- section of businesses, individuals and organizations dedicated to the expansion of the U.S. fuel ethanol industry. Ethanol Facts 2008 Production / 2009 Estimate 9.2 billion gallons / 10.5 billion gallons 2008 Ethanol Imports 556 million gallons Current Annual Production Capacity 12.4 billion gallons Under Construction 2 billion gallons Total Annual Operating Capacity 10.3 billion gallons at 170 locations Ethanol Production Facilities http://www.ethanolrfa.org/industry/locations/

14

EA-0820: Construction of Mixed Waste Storage RCRA Facilities, Buildings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Construction of Mixed Waste Storage RCRA Facilities, 0: Construction of Mixed Waste Storage RCRA Facilities, Buildings 7668 and 7669, Oak Ridge, Tennessee EA-0820: Construction of Mixed Waste Storage RCRA Facilities, Buildings 7668 and 7669, Oak Ridge, Tennessee SUMMARY This EA evaluates the environmental impacts of a proposal to construct and operate two mixed (both radioactive and hazardous) waste storage facilities (Buildings 7668 and 7669) in accordance with Resource Conservation and Recovery Act requirements. Site preparation and construction activities would take place at the U.S. Department of Energy's Oak Ridge National Laboratory in Oak Ridge, Tennessee. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 16, 1994 EA-0820: Finding of No Significant Impact

15

Resource Conservation and Recovery Act  

NLE Websites -- All DOE Office Websites (Extended Search)

Resource Conservation and Recovery Act (RCRA) Resource Conservation and Recovery Act (RCRA) In 1965 the Solid Waste Disposal Act [Public Law (Pub. L.) 89-72] was enacted to improve solid waste disposal methods. It was amended in 1970 by the Resource Recovery Act (Pub. L. 91-512), which provided the Environmental Protection Agency (EPA) with funding for resource recovery programs. However, that Act had little impact on the management and ultimate disposal of hazardous waste. In 1976 Congress enacted the Resource Conservation and Recovery Act (RCRA, Pub. L. 94-580). RCRA established a system for managing non-hazardous and hazardous solid wastes in an environmentally sound manner. Specifically, it provides for the management of hazardous wastes from the point of origin to the point of final disposal (i.e., "cradle to grave"). RCRA also promotes resource recovery and waste minimization.

16

Guide to ground water remediation at CERCLA response action and RCRA corrective action sites  

SciTech Connect

This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM`s after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide`s scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary.

NONE

1995-10-01T23:59:59.000Z

17

RCRA Groundwater Monitoring Plan for Single-Shell Tank Waste Management Area C at the Hanford Site  

SciTech Connect

This document describes the groundwater monitoring plan for Waste Management Area C located in the 200 East Area of the DOE Hanford Site. This plan is required under Resource Conservation and Recovery Act of 1976 (RCRA).

Horton, Duane G.; Narbutovskih, Susan M.

2001-01-01T23:59:59.000Z

18

RCRA FACILITY INVESTIGATION WORKPLAN VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY  

E-Print Network (OSTI)

Assessments, Closures, and Corrective Measures The HSWAs to RCRA, passed in 1984, require any facility seeking. At ETTP, the RCRA closure of K-1025C was completed in CY 2004. The only remaining RCRA-permitted vault in the K-25 Building is K-309-2A. RCRA Unit K-711 is slated for closure in FY 2005. Closure of K-1036A

Wynne, Randolph H.

19

RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3  

SciTech Connect

RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

Not Available

1993-12-01T23:59:59.000Z

20

RCRA Facility Investigation/Remedial Investigation Report with Baseline Risk Assessment for the Fire Department Hose Training Facility (904-113G)  

Science Conference Proceedings (OSTI)

This report documents the Resource Conservation and Recovery Act (RCRA) Facility Investigation/Remedial Investigation/Baseline Risk Assessment (RFI/RI/BRA) for the Fire Department Hose Training Facility (FDTF) (904-113G).

Palmer, E. [Westinghouse Savannah River Company, AIKEN, SC (United States)

1997-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

GRR/Section 18-CA-b - RCRA Process (Hazardous Waste Facility Permit) | Open  

Open Energy Info (EERE)

18-CA-b - RCRA Process (Hazardous Waste Facility Permit) 18-CA-b - RCRA Process (Hazardous Waste Facility Permit) < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-CA-b - RCRA Process (Hazardous Waste Facility Permit) 18CABRCRAProcess (2).pdf Click to View Fullscreen Contact Agencies California Environmental Protection Agency Department of Toxic Substances Control Regulations & Policies Resource Conservation and Recovery Act 40 CRF 261 Title 22, California Code of Regulations, Division 4.5 Triggers None specified Click "Edit With Form" above to add content 18CABRCRAProcess (2).pdf 18CABRCRAProcess (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

22

GRR/Section 18-HI-b - RCRA - Hazardous Waste Treatment, Storage, and  

Open Energy Info (EERE)

8-HI-b - RCRA - Hazardous Waste Treatment, Storage, and 8-HI-b - RCRA - Hazardous Waste Treatment, Storage, and Disposal Permit (TSD) < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-HI-b - RCRA - Hazardous Waste Treatment, Storage, and Disposal Permit (TSD) 18HIB - RCRAHazardousWasteTreatmentStorageAndDisposalPermitTSD.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Health Solid and Hazardous Waste Branch United States Environmental Protection Agency Regulations & Policies Resource Conversation and Recovery Act (42 U.S.C. 6901, et seq.) 40 CFR 270 Hawaii Administrative Rules Title 11, Chapter 261 Hawaii Administrative Rules Title 11, Chapter 265 Triggers None specified Click "Edit With Form" above to add content

23

Metals reclaimer urges agency to put RCRA on track  

SciTech Connect

Twenty-five years ago, the nation yawned, tentatively scratched, then hiccuped its first official awareness of an environmental tumor with the passage of the 1965 Solid Waste Disposal Act. This was the first federal law requiring environmentally sound disposal of household, municipal, commercial and industrial refuse. Earth Day '70 rallies goaded a still sleepy congress into amending the law with the 1970 Resource Recovery Act-a legislative misnomer that would be compounded in 1976 by passage of RCRA. In 1980, RCRA again was amended, and the ruse of a nation struggling toward conservation and recovery continued. EPA's and the Department of Justice's (DOJ) indecision over whether Marine Shale Processors Inc. (St. Rose, La.) is an exempt recycler or a TSDF requiring the permits and scrutiny that status implies is evidence of this ruse. This article explores the risks, frustrations and opportunities encountered by a company that boldly has opted to enter the hazardous waste recycling market despite regulatory uncertainties, competitive disadvantages and difficulties breaking potential clients' disposal habits that include deep-well injection and landfilling valuable resources.

Borner, A.J. (EHMI, Durham, NH (US)); Perry, B.

1991-11-01T23:59:59.000Z

24

Application of NEPA to CERCLA and RCRA Cleanup Actions  

Energy.gov (U.S. Department of Energy (DOE))

The document clarifies DOE policies to streamline the environmental review of actions to be taken under CERCLA and RCRA.

25

RCRA Information Brief, June 1996: Conditional remedies under RCRA correction action  

Science Conference Proceedings (OSTI)

This document describes conditional remedies under RCRA corrective action. The definition of conditional remedies, criteria that must be met, applications to DOE facilities, applicable clean-up standards, and implementation of conditional remedies are discussed in the document.

NONE

1996-06-01T23:59:59.000Z

26

RCRA Part A permit characterization plan for the U-2bu subsidence crater. Revision 1  

Science Conference Proceedings (OSTI)

This plan presents the characterization strategy for Corrective Action Unit (CAU) 109, U-2bu Subsidence Crater (referred to as U-2bu) in Area 2 at the Nevada Test Site (NTS). The objective of the planned activities is to obtain sufficient characterization data for the crater soils and observed wastes under the conditions of the current Resource Conservation and Recovery Act (RCRA) Part A permit. The scope of the characterization plan includes collecting surface and subsurface soil samples with hand augers and for the purpose of site characterization. The sampling strategy is to characterize the study area soils and look for RCRA constituents. Observable waste soils and surrounding crater soils will be analyzed and evaluated according to RCRA closure criteria. Because of the status of the crater a RCRA Part A permit site, acquired radionuclide analyses will only be evaluated in regards to the health and safety of site workers and the disposition of wastes generated during site characterization. The U-2bu Subsidence Crater was created in 1971 by a Lawrence Livermore National Laboratory underground nuclear test, event name Miniata, and was used as a land-disposal unit for radioactive and hazardous waste from 1973 to 1988.

NONE

1998-04-01T23:59:59.000Z

27

Sampling and analysis plan for RCRA closure activities at 218-E-8 Borrow Pit Demolition Site  

Science Conference Proceedings (OSTI)

Purpose of this document is to provide guidance for sampling and analysis activities associated with the proposed Resource Conservation and Recovery Act of 1976 (RCRA) clean closure of the 218-E-8 West Ash Pit Demolition Site. The borrow pit was used for demolition of discarded explosive chemicals, asbestos disposal, tumbleweed incineration, and storage of hazardous waste. Soil samples will be taken from around the blasting pit, to verify that the concentrations of all detonation activity contaminants are below action levels.

Lucas, J.G.

1994-06-02T23:59:59.000Z

28

Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas  

SciTech Connect

This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

ROGERS, P.M.

2000-06-01T23:59:59.000Z

29

Glossary of CERCLA, RCRA and TSCA related terms and acronyms. Environmental Guidance  

Science Conference Proceedings (OSTI)

This glossary contains CERCLA, RCRA and TSCA related terms that are most often encountered in the US Department of Energy (DOE) Environmental Restoration and Emergency Preparedness activities. Detailed definitions are included for key terms. The CERCLA definitions included in this glossary are taken from the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as amended and related federal rulemakings. The RCRA definitions included in this glossary are taken from the Resource Conservation and Recovery Act (RCRA) and related federal rulemakings. The TSCA definitions included in this glossary are taken from the Toxic Substances and Control Act (TSCA) and related federal rulemakings. Definitions related to TSCA are limited to those sections in the statute and regulations concerning PCBs and asbestos.Other sources for definitions include additional federal rulemakings, assorted guidance documents prepared by the US Environmental Protection Agency (EPA), guidance and informational documents prepared by the US Department of Energy (DOE), and DOE Orders. The source of each term is noted beside the term. Terms presented in this document reflect revised and new definitions published before July 1, 1993.

Not Available

1993-10-01T23:59:59.000Z

30

SALTSTONE BATCH 0 TCLP RCRA METAL RESULTS  

Science Conference Proceedings (OSTI)

A saltstone waste form was prepared in the Savannah River National Laboratory from a Tank 50H sample and Z-Area premix material. After the prescribed 28 day cure, samples of the saltstone were collected, and the waste form was shown to meet the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24 requirements for a nonhazardous waste form with respect to RCRA metals. These analyses met all quality assurance specifications of USEPA SW-846.

Cozzi, A

2007-06-14T23:59:59.000Z

31

SACM and the RCRA stabilization initiative: Similarities of principles and applicability  

SciTech Connect

The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the corrective action provisions of the Resource Conservation and Recovery Act (RCRA) provide standards for the remediation of environmental media contaminated with hazardous substances or hazardous waste, respectively. In both cases, prior to the US Environmental Protection Agency`s (EPA) development of the two subject reform initiatives, existing formal processes specified the level of site investigation required, the process for reaching a decision on the method of remediation, public participation in the decision process, and enforcement authorities that include orders and schedules of compliance. Traditionally, implementation of these processes has resulted in a great amount of time, effort, and money being expended before actual remediation began. Following criticism from the public and the regulated community, the EPA has proposed streamlining reforms for hazardous waste site cleanup under both CERCLA and RCRA that will begin remediation sooner with lower costs. The purpose of this Information Brief is to discuss the common goals, processes, and strategies of the Superfund Accelerated Cleanup Model (SACM) and the RCRA Stabilization Initiative.

NONE

1996-01-01T23:59:59.000Z

32

Fall Semiannual Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility at the INL Site  

Science Conference Proceedings (OSTI)

The Waste Calcining Facility (WCF) is located at the Idaho Nuclear Technology and Engineering Center. In 1998, the WCF was closed under an approved Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Closure Plan. Vessels and spaces were grouted and then covered with a concrete cap. The Idaho Department of Environmental Quality issued a final HWMA/RCRA post-closure permit on September 15, 2003, with an effective date of October 16, 2003. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the WCF to ensure continued protection of human health and the environment.

D. F. Gianotto N. C. Hutten

2007-01-12T23:59:59.000Z

33

The Integration of the 241-Z Building Decontamination and Decommissioning Under Cercla with RCRA Closure at the Plutonium Finishing Plant  

SciTech Connect

The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the Resource Conservation and Recovery Act of 1976 (RCRA) and Washington State Hazardous Waste Management Act, RCW 70.105, , have been deactivated and are being actively decommissioned under the provisions of the Hanford Federal Facility Agreement and Consent Order (HFFACO), RCRA and Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) 42 U.S.C. 9601 et seq. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4, D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building. The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground piping from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions will address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential past-practice contamination identified during 241-Z closure, while outside the scope of the Hanford Facility Dangerous Waste Closure Plan, 241-Z Treatment and Storage Tanks. Under the RCRA closure plan, the 241-Z TSD unit is anticipated to undergo clean closure to the performance standards of the State of Washington with respect to dangerous waste contamination from RCRA operations. The TSD unit will be clean closed if physical closure activities identified in the plan achieve clean closure standards for all 241-Z locations. Clean closed 241-Z treatment and storage tanks, equipment and/or structures will remain after RCRA clean closure for future disposition in conjunction with PFP decommissioning activities which are integrated with CERCLA. (authors)

Mattlin, E.; Charboneau, S. [U.S. Department of Energy, Richland Operations Office, Richland WA (United States); Johnston, G.; Hopkins, A.; Bloom, R.; Skeels, B.; Klos, D.B. [Fluor Hanford, Inc., Richland WA (United States)

2007-07-01T23:59:59.000Z

34

Quarterly report of RCRA groundwater monitoring data for period October 1 through December 31, 1994  

SciTech Connect

Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and {open_quotes}Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities{close_quotes} (Title 40 Code of Federal Regulations [CFR] Part 265), as amended. Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. The location of each facility is shown. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between October and December 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter, but also data from earlier sampling events that were not previously reported.

NONE

1995-04-01T23:59:59.000Z

35

HWMA/RCRA Closure Plan for the CPP-602 Laboratory Lines  

SciTech Connect

This Hazardous Waste Management Act/Resource Conservation and Recovery Act Closure (HWMA/RCRA) Plan for the CPP-602 laboratory lines was developed to meet the tank system closure requirements of the Idaho Administrative Procedures Act 58.01.05.008 and 40 Code of Federal Regulations 264, Subpart G. CPP-602 is located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The lines in CPP-602 were part of a liquid hazardous waste collection system included in the Idaho Nuclear Technology and Engineering Center Liquid Waste Management System Permit. The laboratory lines discharged to the Deep Tanks System in CPP-601 that is currently being closed under a separate closure plan. This closure plan presents the closure performance standards and the methods for achieving those standards. The closure approach for the CPP-602 laboratory lines is to remove the lines, components, and contaminants to the extent practicable. Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Site CPP-117 includes the CPP-602 waste trench and the area beneath the basement floor where waste lines are direct-buried. Upon completion of rinsing or mopping to remove contamination to the extent practicable from the waste trench and rinsing the intact buried lines (i.e., stainless steel sections), these areas will be managed as part of CERCLA Site CPP-117 and will not be subject to further HWMA/RCRA closure activities. The CPP-602 building is being decontaminated and decommissioned under CERCLA as a non-time critical removal action in accordance with the Federal Facility Agreement/Consent Order. As such, all waste generated by this CERCLA action, including closure-generated waste, will be managed in coordination with that CERCLA action in substantive compliance with HWMA/RCRA regulations. All waste will be subject to a hazardous waste determination for the purpose of supporting appropriate management and will be managed in accordance with this plan. ii

Idaho Cleanup Project

2009-09-30T23:59:59.000Z

36

General requirements for RCRA regulated hazardous waste tanks  

Science Conference Proceedings (OSTI)

The Resource Conservation and Recovery Act (RCRA), as amended, requires that tanks used for the storage or treatment of hazardous waste (HazW) be permitted, and comply with the requirements contained within the Code of Federal Regulations (CFR) TItle 40 in Subpart J of Part 264/265, unless those tanks have been exempted. Subpart J specifies requirements for the design, construction, installation, operation, inspection, maintenance, repair, release, response, and closure of HazW tanks. Also, the regulations make a distinction between new and existing tanks. Effective December 6, 1995, standards for controlling volatile organic air emissions will apply to non-exempt HazW tanks. HazW tanks will have to be equipped with a cover or floating roof, or be designed to operate as a closed system, to be in compliance with the air emission control requirements. This information brief describes those tanks that are subject to the Subpart J requirements, and will also discuss secondary containment, inspection, restrictions on waste storage, release response, and closure requirements associated with regulated HazW tanks.

NONE

1995-11-01T23:59:59.000Z

37

Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility at the INL Site  

Science Conference Proceedings (OSTI)

The Waste Calcining Facility (WCF) is located at the Idaho Nuclear Technology and Engineering Center. In 1998, the WCF was closed under an approved Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Closure Plan. Vessels and spaces were grouted and then covered with a concrete cap. The Idaho Department of Environmental Quality issued a final HWMA/RCRA post-closure permit on September 15, 2003, with an effective date of October 16, 2003. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the WCF to ensure continued protection of human health and the environment. The post-closure permit also includes semiannual reporting requirements under Permit Conditions III.H. and I.U. These reporting requirements have been combined into this single semiannual report.

Idaho Cleanup Project

2006-06-01T23:59:59.000Z

38

Sampling and analysis plan for RCRA closure activities at 200 West Ash Pit Demolition Site  

Science Conference Proceedings (OSTI)

This document provides guidance for sampling and analysis activities associated with the proposed Resource Conservation and Recovery Act of 1976 (RCRA) clean closure of the 200 West Ash Pit Demolition Site. Soil samples will be taken around the blasting pit, in order to verify that the concentrations of all detonation activity contaminants are below action levels. The borrow pit was used for demolition of discarded explosive chemicals, tumbleweed incineration, and as a source of soil for construction material. The demolition site was located apart from the others within the borrow pit.

Lucas, J.G.

1994-06-02T23:59:59.000Z

39

Institutional Controls in RCRA & CERCLA Response Actions  

NLE Websites -- All DOE Office Websites (Extended Search)

EH-413-0004 EH-413-0004 Institutional Controls in RCRA & CERCLA Response Actions August 2000 United States Department of Energy Office of Environmental Policy and Guidance RCRA/CERCLA Division (EH-413) Selecting and Implementing Institutional Controls in RCRA and CERCLA Response Actions at Department of Energy Facilities August 2000 Prepared by U.S. Department of Energy Office of Environmental Policy and Guidance RCRA/CERCLA Division (EH-413) Technical Support by Argonne National Laboratory Project Performance Corporation For Additional Information Contact: John J. Bascietto, EH-413 phone: 202-586-7917 fax: 202-586-3915 john.bascietto@eh.doe.gov Jerry Coalgate, EH-413 phone: 202-586-6075 fax: 202-586-3915 jerry.coalgate@eh.doe.gov Table of Contents Chapter 1 Introduction .

40

Monitoring Plan for RCRA Groundwater Assessment at the 216-U-12 Crib  

Science Conference Proceedings (OSTI)

This plan provides updates the ongoing RCRA interim status groundwater monitoring program for the U-12 crib and provides a proposed RCRA final status post-closure groundwater monitoring program.

Williams, Bruce A.; Chou, Charissa J.

2003-09-29T23:59:59.000Z

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

The marriage of RCRA and CERCLA at the Rocky Flats Environmental Technology Site  

Science Conference Proceedings (OSTI)

A key goal of the Rocky Flats Cleanup Agreement (RFCA) signed in July of 1996 was to provide a seamless marriage of the Resource Conservation and Recovery Act (RCRA) (and other media specific programs) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and the implementing agencies of each. This paper examines the two years since the signing of RFCA and identifies the successes, failures, and stresses of the marriage. RFCA has provided an excellent vehicle for regulatory and substantive progress at the Department of Energy`s Rocky Flats facility. The key for a fully successful marriage is to build on the accomplishments to date and to continually improve the internal and external systems and relationships. To date, the parties can be proud of both the substantial accomplishment of substantive environmental work and the regulatory systems that have enabled the work.

Shelton, D.C.; Brooks, L.M.

1998-11-01T23:59:59.000Z

42

Monitoring Plan for RCRA Groundwater Assessment at the 216-U-12 Crib  

Science Conference Proceedings (OSTI)

This document contains a revised and updated monitoring plan for RCRA interim status groundwater assessment, site hydrogeology, and a conceptual model of the RCRA treatment, storage, and disposal unit. Monitoring under interim status is expected to continue until the 216-U-12 crib is incorporated as a chapter into the Hanford Facility RCRA Permit or administratively closed as proposed to EPA and Ecology.

Williams, Bruce A.; Chou, Charissa J.

2005-09-20T23:59:59.000Z

43

RCRA Assessment Plan for Single-Shell Tank Waste Management Area TX-TY  

SciTech Connect

WMA TX-TY contains underground, single-shell tanks that were used to store liquid waste that contained chemicals and radionuclides. Most of the liquid has been removed, and the remaining waste is regulated under the RCRA as modified in 40 CFR Part 265, Subpart F and Washington States Hazardous Waste Management Act . WMA TX-TY was placed in assessment monitoring in 1993 because of elevated specific conductance. A groundwater quality assessment plan was written in 1993 describing the monitoring activities to be used in deciding whether WMA TX-TY had affected groundwater. That plan was updated in 2001 for continued RCRA groundwater quality assessment as required by 40 CFR 265.93 (d)(7). This document further updates the assessment plan for WMA TX-TY by including (1) information obtained from ten new wells installed at the WMA after 1999 and (2) information from routine quarterly groundwater monitoring during the last five years. Also, this plan describes activities for continuing the groundwater assessment at WMA TX TY.

Horton, Duane G.

2007-03-26T23:59:59.000Z

44

RCRA permit modifications and the functional equivalency demonstration: A case study  

SciTech Connect

Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements, typically by reference to the original permit application, that specific components and equipment be used. Consequently, changing these items, even for the purpose of routine maintenance, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are functionally equivalent, as defined by RCRA, to the original specifications embodied by the permit. The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements that involve replacement of components. The incinerator`s carbon adsorption unit/high efficiency particulate air filtration system, in particular, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. in performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent.

Kinker, J.; Lyon, W.; Carnes, R.; Loehr, C. [Benchmark Environmental Corp., Albuquerque, NM (United States); Elsberry, K.; Garcia, P. [Los Alamos National Lab., NM (United States)

1996-05-01T23:59:59.000Z

45

National spent fuel program preliminary report RCRA characteristics of DOE-owned spent nuclear fuel DOE-SNF-REP-002. Revision 3  

Science Conference Proceedings (OSTI)

This report presents information on the preliminary process knowledge to be used in characterizing all Department of Energy (DOE)-owned Spent Nuclear Fuel (SNF) types that potentially exhibit a Resource Conservation and Recovery Act (RCRA) characteristic. This report also includes the process knowledge, analyses, and rationale used to preliminarily exclude certain SNF types from RCRA regulation under 40 CFR {section}261.4(a)(4), ``Identification and Listing of Hazardous Waste,`` as special nuclear and byproduct material. The evaluations and analyses detailed herein have been undertaken as a proactive approach. In the event that DOE-owned SNF is determined to be a RCRA solid waste, this report provides general direction for each site regarding further characterization efforts. The intent of this report is also to define the path forward to be taken for further evaluation of specific SNF types and a recommended position to be negotiated and established with regional and state regulators throughout the DOE Complex regarding the RCRA-related policy issues.

NONE

1995-07-01T23:59:59.000Z

46

ENVIRONMENTALLY SOUND DISPOSAL OF RADIOACTIVE MATERIALS AT A RCRA HAZARDOUS WASTE DISPOSAL FACILITY  

SciTech Connect

The use of hazardous waste disposal facilities permitted under the Resource Conservation and Recovery Act (''RCRA'') to dispose of low concentration and exempt radioactive materials is a cost-effective option for government and industry waste generators. The hazardous and PCB waste disposal facility operated by US Ecology Idaho, Inc. near Grand View, Idaho provides environmentally sound disposal services to both government and private industry waste generators. The Idaho facility is a major recipient of U.S. Army Corps of Engineers FUSRAP program waste and received permit approval to receive an expanded range of radioactive materials in 2001. The site has disposed of more than 300,000 tons of radioactive materials from the federal government during the past five years. This paper presents the capabilities of the Grand View, Idaho hazardous waste facility to accept radioactive materials, site-specific acceptance criteria and performance assessment, radiological safety and environmental monitoring program information.

Romano, Stephen; Welling, Steven; Bell, Simon

2003-02-27T23:59:59.000Z

47

The RCRA toxicity characteristic leaching procedure (TCLP) : a concept for a new method.  

Science Conference Proceedings (OSTI)

The U.S. Environmental Protection Agency has committed to reexamining its use of the Toxicity Characteristic Leaching Procedure (TCLP). The TCLP was developed to support the Resource Conservation and Recovery Act (RCRA) Toxicity Characteristic (40 CFR 261.24) and to help predict whether toxic constituents of solid wastes would be mobilized upon their contact with municipal waste leachate. The method involves a batch extraction test in which wastes are exposed to an aqueous liquid designed to simulate the solvent properties of municipal waste leachates. The resulting extract (i.e., TCLP leachate) is analyzed for the presence of various organic and inorganic contaminants. This article presents a concept for a new method that addresses a number of critical design criteria. The concept is based on a preliminary method developed by the authors as part of a work group chaired by the American Society for Testing and Materials.

Kimmell, T. A.; Williams, L. R.; Sorini, S. S.; Environmental Assessment; National Research Lab.; Western Research Inst.

2001-08-01T23:59:59.000Z

48

Performance Demonstration Program Plan for RCRA Constituent Analysis of Solidified Wastes  

Science Conference Proceedings (OSTI)

The Performance Demonstration Program (PDP) for Resource Conservation and Recovery Act (RCRA) constituents distributes test samples for analysis of volatile organic compounds (VOCs), semivolatile organic compounds (SVOCs), and metals in solid matrices. Each distribution of test samples is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD; DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department. The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the RCRA PDP. Participating laboratories demonstrate acceptable performance by successfully analyzing single- blind performance evaluation samples (subsequently referred to as PDP samples) according to the criteria established in this plan. PDP samples are used as an independent means to assess laboratory performance regarding compliance with the WAP quality assurance objectives (QAOs). The concentrations of analytes in the PDP samples address levels of regulatory concern and encompass the range of concentrations anticipated in waste characterization samples. The WIPP requires analyses of homogeneous solid wastes to demonstrate compliance with regulatory requirements. These analyses must be performed by laboratories that demonstrate acceptable performance in this PDP. These analyses are referred to as WIPP analyses, and the samples on which they are performed are referred to as WIPP samples. Participating laboratories must analyze PDP samples using the same procedures used for WIPP samples.

Carlsbad Field Office

2006-09-21T23:59:59.000Z

49

Guidance on Compliance with the National Environmental Policy Act for Corrective Actions Conducted under the Resource Conservation and Recovery Act  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

K9;07-w) K9;07-w) United State s Governme nt Department of Enerav memorandum DATE: REPLY TO AlT" OF: SUBJECT: TO: December 23, 1997 Office of NEPA Policy and Assistance:Osborne:202-586-4596 Guidance on National Environmental Policy Act (NEPA) Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) NEPA Compliance Officers and Assistant Managers for Environmental Management I am pleased to provide the attached guidance on NEPA review for corrective actions under RCRA. This guidance results from the work of a Task Team formed by Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental

50

RCRA Summary Document for the David Witherspoon 1630 Site, Knoxville, Tennessee  

Science Conference Proceedings (OSTI)

The 48-acre David Witherspoon, Inc. (DWI) 1630 Site operated as an unregulated industrial landfill and scrap yard. The Tennessee Division of Superfund (TDSF) closed the landfill in 1974. During the period of operation, the site received solid and liquid wastes from salvage and industrial operations. The site consists of five separate tracts of land including a small portion located across the Norfolk Southern Railroad track. The landfill occupies approximately 5 acres of the site, and roughly 20 acres of the 48 acres contains surface and buried debris associated with the DWI dismantling business operation. Beginning in 1968, the state of Tennessee licensed DWI to receive scrap metal at the DWI 1630 Site, contaminated with natural uranium and enriched uranium (235U) not exceeding 0.1 percent by weight (TDSF 1990). The U.S. Department of Energy (DOE) has agreed to undertake remedial actions at the DWI 1630 Site as specified under a Consent Order with the Tennessee Department of Environment and Conservation (TDEC) (Consent Order No. 90-3443, April 4, 1991), and as further delineated by a Memorandum of Understanding (MOU) between DOE and the State of Tennessee (MOU Regarding Implementation of Consent Orders, October 6, 1994). The soil and debris removal at the DWI 1630 Site is being performed by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. Remediation consists of removing contaminated soil and debris from the DWI 1630 site except for the landfill area and repairing the landfill cap. The DWI 1630 remediation waste that is being disposed at the Environmental Management Waste Management Facility (EMWMF) as defined as waste lot (WL) 146.1 and consists primarily of soils and soil like material, incidental debris and secondary waste generated from the excavation of debris and soil from the DWI 1630 site. The WL 146.1 includes soil, soil like material (e.g., shredded or chipped vegetation, ash), discrete debris items (e.g., equipment, drums, large scrap metal, cylinders, and cable) and populations of debris type items (e.g., piles of bricks, small scrap metal, roofing material, scaffolding, and shelving) that are located throughout the DWI 1630 site. The project also generates an additional small volume of secondary waste [e.g., personal protective equipment (PPE), and miscellaneous construction waste] that is bagged and included in bulk soil shipments to the EMWMF. The Waste Acceptance Criteria (WAC) for the EMWMF does not allow for material that does not meet the Resource Conservation and Recovery Act (RCRA) Land Disposal Restrictions (LDRs). The waste being excavated in certain areas of the DWI 1630 site contained soil that did not meet RCRA LDR criteria; therefore this waste had to be segregated for treatment or alternate disposal offsite. This document identifies the approach taken by the DWI 1630 project to further characterize the areas identified during the Phase II Remedial Investigation (RI) as potentially containing RCRA-characteristic waste. This document also describes the methodology used to determine excavation limits for areas determined to be RCRA waste, post excavation sampling, and the treatment and disposal of this material.

Pfeffer, J.

2008-06-10T23:59:59.000Z

51

HOW TO PLAN AND CONDUCT AN RCRA PART B TRIAL BURN TEST: FROM A PRACTICAL POINT OF VIEW  

E-Print Network (OSTI)

Creek Hydrogeologic Regime at the Department of Energy Y-12 Plant, Oak Ridge, Tennessee,(RCRA Post-Closure Ridge, Tennessee, (RCRA Post- Closure Permit No. TNHW-088, EPA Identification No. TN3 89 009 0001), Y Regime at the Department of Energy Y-12 Plant, Oak Ridge, Tennessee,(RCRA Post- Closure Permit No. TNHW

Columbia University

52

Quarterly report of RCRA groundwater monitoring data for period October 1, 1992--December 31, 1992  

SciTech Connect

Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 CFR 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. Long-term laboratory contracts were approved on October 22, 1991. DataChem Laboratories of Salt Lake City, Utah, performs the hazardous chemicals analyses for the Hanford Site. Analyses for coliform bacteria are performed by Columbia/Biomedical Laboratories and for dioxin by TMS Analytical Services, Inc. International Technology Analytical Services Richland, Washington performs the radiochemical analyses. This quarterly report contains data that were received prior to March 8, 1993. This report may contain not only data from the October through December quarter but also data from earlier sampling events that were not previously reported.

Not Available

1993-04-01T23:59:59.000Z

53

Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.

Not Available

1993-05-01T23:59:59.000Z

54

Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas  

SciTech Connect

This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

MCCARTHY, M.M.

1999-08-01T23:59:59.000Z

55

GRR/Section 18-HI-b - RCRA - Hazardous Waste Treatment, Storage...  

Open Energy Info (EERE)

8-HI-b - RCRA - Hazardous Waste Treatment, Storage, and Disposal Permit (TSD) < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help...

56

RCRA Waste Minimization and Recycling Initiatives at the Health Center (Rev. 12/09)  

E-Print Network (OSTI)

of a spill. The Office of Research Safety submitted samples of "typical" dental amalgam for TCLP testing. The TCLP test results indicated that amalgam is not a hazardous waste viewed from the RCRA definition

Kim, Duck O.

57

Borehole Data Package for RCRA Well 299-W22-47 at Single-Shell Tank Waste Management Area S-SX, Hanford Site, Washington  

SciTech Connect

One new Resource Conservation and Recovery Act (RCRA) groundwater assessment well was installed at single-shell tank Waste Management Area (WMA) S-SX in fiscal year (FY) 2005 to fulfill commitments for well installations proposed in Hanford Federal Facility Agreement and Consent Order, Milestone M-24-57 (2004). The need for the new well, well 299-W22-47, was identified during a data quality objectives process for establishing a RCRA/ Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)/Atomic Energy Act (AEA) integrated 200 West and 200 East Area Groundwater Monitoring Network. This document provides a compilation of all available geologic data, spectral gamma ray logs, hydrogeologic data and well information obtained during drilling, well construction, well development, pump installation, aquifer testing, and sample collection/analysis activities. Appendix A contains the Well Summary Sheets, the Well Construction Summary Report, the geologist's Borehole Log, well development and pump installation records, and well survey results. Appendix B contains analytical results from groundwater samples collected during drilling. Appendix C contains complete spectral gamma ray logs and borehole deviation surveys.

Horton, Duane G.; Chamness, Mickie A.

2006-04-17T23:59:59.000Z

58

Temporal trend analysis of RCRA groundwater monitoring data  

SciTech Connect

Statistical analysis of RCRA groundwater monitoring data at a uranium hexafluoride processing facility showed a statistically significant increase in the concentration of gross beta activity in monitor wells downgradient of surface impounds storing calcium fluoride sludge and high pH water. Because evidence of leakage had not been detected in lysimeters installed beneath the impounds, the operator sought an evaluation of other potential causes of the result, including natural variability. This study determined that all five data sets showed either long-term excursionary (spike-like), or seasonal forms of temporal variation. Gross beta had an upward long-term trend with multiple excursions that almost appeared to be seasonal. Gross alpha had an upward long-term trend with multiple excursions that were clearly not seasonal. Specific conductance had both upward and downward long-term trends but no other variations. pH had a downward long-term trend with multiple excursions that were clearly not seasonal. Fluoride had a downward long-term trend without excursions but with clear seasonal variations. The gross beta result that appeared to be a significant change was a spike event on the upward long-term trend.

Need, E.A. (Rust Environment and Infrastructure, Naperville, IL (United States))

1994-04-01T23:59:59.000Z

59

EA-0820: Construction of Mixed Waste Storage RCRA Facilities...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

waste storage facilities (Buildings 7668 and 7669) in accordance with Resource Conservation and Recovery Act requirements. Site preparation and construction activities would...

60

GRR/Section 18-NV-b - State RCRA Process | Open Energy Information  

Open Energy Info (EERE)

b - State RCRA Process b - State RCRA Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-NV-b - State RCRA Process 18NVBStateRCRAProcess.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Regulations & Policies Nevada Revised Statutes (NRS) Nevada Administrative Code (NAC) Triggers None specified Click "Edit With Form" above to add content 18NVBStateRCRAProcess.pdf 18NVBStateRCRAProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Within the Nevada Division of Environmental Protection in Nevada, the Bureau of Waste Management (BWM) operates a permitting and compliance

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

RCRA corrective action for underground storage tanks -- Subtitle C for Subtitle I  

Science Conference Proceedings (OSTI)

The purpose of this report is to provide guidance to DOE and DOE contractor personnel responsible for planning and implementation of corrective measures addressing cleanup of releases of hazardous materials or regulated substances from underground storage tanks regulated under RCRA Subtitle C or Subtitle I.

NONE

1995-08-01T23:59:59.000Z

62

US Department of Energy`s Federal Facility Compliance Act Chief Financial Officer`s Report to Congress for fiscal year 1993  

Science Conference Proceedings (OSTI)

The Federal Facility Compliance Act of 1992 (FFCAct) (Public Law 102-386) was enacted into law on October 6, 1992. In addition to amending the Resource Conservation and Recovery Act (RCRA), the FFCAct requires the US Department of Energy (DOE) to prepare an annual report from the Chief Financial Officer to the Congress on compliance activities undertaken by the DOE with regard to mixed waste streams and provide an accounting of the fines and penalties imposed upon the DOE for violations involving mixed waste. This document has been prepared to report the necessary information. Mixed waste is defined by the FFCAct to include those wastes containing both hazardous waste as defined in the RCRA and source, special nuclear, or byproduct material subject to the Atomic Energy Act of 1954, as amended (42 U.S.C. Section 2001 et seq.). Section 2 of this report briefly summarizes DOE Headquarters` activities conducted during Fiscal Year 1993 (FY 1993) to comply with the requirements of the FFCAct. Section 3 of this report provides an overview of the site-specific RCRA compliance activities, relating to mixed waste streams, conducted in FY 1993 for those sites that currently generated or store mixed waste that are subject to regulation under RCRA. Section 4 provides information on notifications of alleged RCRA violations involving mixed waste imposed upon the DOE during FY 1993 and an accounting of any fines and penalties associated with these violations. Appendix A provides site-specific summaries of RCRA compliance activities, relating to mixed waste streams, conducted in FY 1993 for those sites that currently generate or store mixed waste that are subject to regulation under RCRA.

Not Available

1993-12-01T23:59:59.000Z

63

RCRA Facility Investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

WAG 6 comprises a shallow land burial facility used for disposal of low-level radioactive wastes (LLW) and, until recently, chemical wastes. As such, the site is subject to regulation under RCRA and the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). To comply with these regulations, DOE, in conjunction with the Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC), developed a strategy for closure and remediation of WAG 6 by 1997. A key component of this strategy was to complete an RFI by September 1991. The primary objectives of the RFI were to evaluate the site's potential human health and environmental impacts and to develop a preliminary list of alternatives to mitigate these impacts. The WAG 6 one of three solid waste management units evaluated Oak Ridge National Laboratory (ORNL) existing waste disposal records and sampling data and performed the additional sampling and analysis necessary to: describe the nature and extent of contamination; characterize key contaminant transport pathways; and assess potential risks to human health and the environment by developing and evaluating hypothetical receptor scenarios. Estimated excess lifetime cancer risks as a result for exposure to radionuclides and chemicals were quantified for each hypothetical human receptor. For environmental receptors, potential impacts were qualitatively assessed. Taking into account regulatory requirements and base line risk assessment results, preliminary site closure and remediation objectives were identified, and a preliminary list of alternatives for site closure and remediation was developed.

Not Available

1991-09-01T23:59:59.000Z

64

Borehole Data Package for Two RCRA Wells 299-W11-25B and 299-W11-46 at Single-Shell Tank Waste Management Area T, Hanford Site, Washington  

Science Conference Proceedings (OSTI)

One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring and assessment well was installed at single-shell tank Waste Management Area (WMA) T in calendar year 2005 in partial fulfillment of commitments for well installations proposed in Hanford Federal Facility Agreement and Consent Order, Milestone M-24-57 (2004). The need for increased monitoring capability at this WMA was identified during a data quality objectives process for establishing a RCRA/Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)/Atomic Energy Act (AEA) integrated 200 West and 200 East Area Groundwater Monitoring Network. The initial borehole, 299-W11-25B, was located about 20 ft from existing downgradient well 299 W11-39. The specific objective for the borehole was to determine the vertical distribution of contaminants in the unconfined aquifer at the northeast corner of WMA T. The permanent casing in borehole 299-W11-25B was damaged beyond repair during well construction and replacement borehole, 299-W11-46, was drilled about 10 ft from borehole 299-W11-25B (Figure 1). Borehole 299-W11-46 was completed as a RCRA monitoring well. This document provides a compilation of all available geologic data, geophysical logs, hydrogeologic data and well information obtained during drilling, well construction, well development, pump installation, groundwater sampling and analysis activities, and preliminary results of slug tests associated with wells 299-W11-25B and 299-W11-46. Appendix A contains geologists logs, Well Construction Summary Reports, Well Summary Sheets (as-built diagrams), and Well Development and Testing Data sheets. Appendix B contains the results of chemical analysis of groundwater samples. Appendix C contains complete spectral gamma-ray logs and borehole deviation surveys and Appendix D contains initial results of slug tests. The non-conformance report for borehole 299-W11-46 is provided in Appendix E.

Horton, Duane G.; Chamness, Mickie A.

2006-04-17T23:59:59.000Z

65

RCRA designation of discarded americium/beryllium sealed sources  

SciTech Connect

Many sealed sources containing americium and beryllium are used throughout construction, industry, and research, and will eventually require disposal. For planning purposes it is necessary to determine whether these sources, when disposed, constitute a mixed waste, i.e., a waste containing hazardous constituents regulated under the Resource Conservation and Recovery Act and radioactive constituents regulated under the Atomic Energy Act. Waste designation criteria contained in 40 CFR 261 are evaluated in detail in this report. It is determined that discarded americium/beryllium sealed sources do not contain any wastes listed in Subpart D of 40 CFR 261, nor do the discarded sources exhibit any hazardous characteristics. Therefore, it is concluded that discarded americium/beryllium sealed sources are not a mixed waste under regulations established by the US Environmental Protection Agency. Hazardous waste regulatory programs delegated to States, however, may have regulations that differ from those of the Federal government.

Kirner, N.P. [Ebasco Environmental, Idaho Falls, ID (United States)

1994-09-01T23:59:59.000Z

66

Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada  

SciTech Connect

This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field-investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans.

Not Available

1994-06-01T23:59:59.000Z

67

Fall 2010 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility and the CPP 601/627/640 Facility at the INL Site  

Science Conference Proceedings (OSTI)

The Waste Calcining Facility is located at the Idaho Nuclear Technology and Engineering Center. In 1999, the Waste Calcining Facility was closed under an approved Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Closure Plan. Vessels and spaces were grouted and then covered with a concrete cap. The Idaho Department of Environmental Quality issued a final HWMA/RCRA post-closure permit on September 15, 2003, with an effective date of October 16, 2003. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the Waste Calcining Facility to ensure continued protection of human health and the environment. The post closure permit also includes semiannual reporting requirements under Permit Conditions III.H. and I.U. These reporting requirements have been combined into this single semiannual report, as agreed between the Idaho Cleanup Project and Idaho Department of Environmental Quality. The Permit Condition III.H. portion of this report includes a description and the results of field methods associated with groundwater monitoring of the Waste Calcining Facility. Analytical results from groundwater sampling, results of inspections and maintenance of monitoring wells in the Waste Calcining Facility groundwater monitoring network, and results of inspections of the concrete cap are summarized. The Permit Condition I.U. portion of this report includes noncompliances not otherwise required to be reported under Permit Condition I.R. (advance notice of planned changes to facility activity which may result in a noncompliance) or Permit Condition I.T. (reporting of noncompliances which may endanger human health or the environment). This report also provides groundwater sampling results for wells that were installed and monitored as part of the Phase 1 post-closure period of the landfill closure components in accordance with HWMA/RCRA Landfill Closure Plan for the CPP-601 Deep Tanks System Phase 1. These monitoring wells are intended to monitor for the occurrence of contaminants of concern in the perched water beneath and adjacent to the CPP-601/627/640 Landfill. The wells were constructed to satisfy requirements of the HWMA/RCRA Post-Closure Plan for the CPP 601/627/640 Landfill.

Boehmer, Ann

2010-11-01T23:59:59.000Z

68

RCRA delisting of agent-decontaminated waste and remediation waste at Dugway Proving Ground: A program update  

Science Conference Proceedings (OSTI)

In July 1988, the state of Utah issued regulations that declared residues resulting from the demilitarization, treatment, and testing of military chemical agents to be hazardous wastes. These residues were designated as corrosive, reactive, toxic, and acute hazardous (Hazardous Waste No. F999). These residues are not listed by the U.S. Environmental Protection Agency (EPA) as hazardous waste under the Resource Conservation and Recovery Act (RCRA), which is the primary law governing management of hazardous waste in the United States. The RCRAI regulations (40 CFR 260-280), the Utah Administrative Code (R-315), and other state hazardous waste programs list specific wastes as hazardous but allow generators to petition the regulator to {open_quotes}delist{close_quotes} if it can be demonstrated that such wastes are not hazardous. In 1994, the U.S. Army Test and Evaluation Command FECOM initiated a project with the Argonne National Laboratory (Argonne) to demonstrate that certain categories of F999 residues are not hazardous waste and to achieve delisting. The initial focus is on delisting agent-decontaminated residues and soil with a history of contamination at the U.S. Army Dugway Proving Ground (DPG), Utah. An overview of the DPG delisting program was presented at the 1995 American Defense Preparedness Association Environmental Symposium. Since that time, much progress has been made. The purpose of this paper is to review the DPG delisting program and discuss overall progress. Emphasis is placed on progress with regard to analytical methods that will be used to demonstrate that the target residues do not contain hazardous amounts of chemical agent.

Kimmell, T.A.; Anderson, A.W.; O`Neill, H.J. [and others

1996-03-01T23:59:59.000Z

69

Privacy Act  

NLE Websites -- All DOE Office Websites (Extended Search)

Privacy Act Privacy Act Privacy Act Code of Federal Regulations (CFR) for the Privacy Act is 10CFR 1008 Privacy Act of 1974 and Amendments (as of Jan 2, 1991) From GPO US Code on CD-ROM (GPO S/N 052-001-004-00439-6) $30.00 -CITE- 5 USC Sec. 552a -EXPCITE- TITLE 5 PART I CHAPTER 5 SUBCHAPTER II -HEAD- Sec. 552a. Records maintained on individuals -EXPCITE- TITLE 5 PART I CHAPTER 5 SUBCHAPTER II -HEAD- Sec. 552a. Records maintained on individuals -STATUTE- (a) Definitions. - For purposes of this section - (1) the term 'agency' means agency as defined in section 552(e) (FOOTNOTE 1) of this title; (FOOTNOTE 1) See References in Text note below. (2) the term 'individual' means a citizen of the United States or an alien lawfully admitted for permanent residence (3) the term 'maintain' includes maintain, collect, use, or disseminate;

70

Recovery Act  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Recovery Act Buy American Requirements for Information Needed from Financial Assistance Applicants/Recipients for Waiver Requests Based on Unreasonable Cost or Nonavailability Applicants for and recipients of financial assistance funded by the Recovery Act must comply with the requirement that all of the iron, steel, and manufactured goods used for a project for the construction, alteration, maintenance, or repair of a public building or public work be produced in the United States, unless the head of the agency makes a waiver, or determination of inapplicability of the Buy American Recovery Act provisions, based on one of the authorized exceptions. The authorized exceptions are unreasonable cost, nonavailability, and in furtherance of the public interest. This

71

Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order  

Science Conference Proceedings (OSTI)

This Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about sampling design, required analyses, and sample collection and handling procedures, is to be used in conjunction with the Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System.

Evans, S.K.

2002-01-31T23:59:59.000Z

72

Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order  

Science Conference Proceedings (OSTI)

This Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about sampling design, required analyses, and sample collection and handling procedures, is to be used in conjunction with the Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System.

Evans, Susan Kay; Orchard, B. J.

2002-01-01T23:59:59.000Z

73

DOE/EA-0820 ENVIRONMENTAL ASSESSMENT Construction of Mixed Waste Storage RCRA Facilities,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20 20 ENVIRONMENTAL ASSESSMENT Construction of Mixed Waste Storage RCRA Facilities, Buildings 7668 and 7669 u.s. Department of Energy Oak Ridge National Laboratory Oak Ridge, Tennessee April 1994 ER t>ISTRf8UT!Q~~ Or-~I-:r8 DOCUMENT IS UNLlMIT~ DISCLAIMER This report was .prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial

74

RCRA Facility Investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 1, Sections 1 through 3: Environmental Restoration Program  

Science Conference Proceedings (OSTI)

WAG 6 comprises a shallow land burial facility used for disposal of low-level radioactive wastes (LLW) and, until recently, chemical wastes. As such, the site is subject to regulation under RCRA and the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). To comply with these regulations, DOE, in conjunction with the Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC), developed a strategy for closure and remediation of WAG 6 by 1997. A key component of this strategy was to complete an RFI by September 1991. The primary objectives of the RFI were to evaluate the site`s potential human health and environmental impacts and to develop a preliminary list of alternatives to mitigate these impacts. The WAG 6 one of three solid waste management units evaluated Oak Ridge National Laboratory (ORNL) existing waste disposal records and sampling data and performed the additional sampling and analysis necessary to: describe the nature and extent of contamination; characterize key contaminant transport pathways; and assess potential risks to human health and the environment by developing and evaluating hypothetical receptor scenarios. Estimated excess lifetime cancer risks as a result for exposure to radionuclides and chemicals were quantified for each hypothetical human receptor. For environmental receptors, potential impacts were qualitatively assessed. Taking into account regulatory requirements and base line risk assessment results, preliminary site closure and remediation objectives were identified, and a preliminary list of alternatives for site closure and remediation was developed.

Not Available

1991-09-01T23:59:59.000Z

75

Federal Facility Compliance Act: Conceptual Site Treatment Plan for Lawrence Livermore National Laboratory, Livermore, California  

Science Conference Proceedings (OSTI)

The Department of Energy (DOE) is required by section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (the Act), to prepare plans describing the development of treatment capacities and technologies for treating mixed waste. The Act requires site treatment plans (STPs or plans) to be developed for each site at which DOE generates or stores mixed waste and submitted to the State or EPA for approval, approval with modification, or disapproval. The Lawrence Livermore National Laboratory (LLNL) Conceptual Site Treatment Plan (CSTP) is the preliminary version of the plan required by the Act and is being provided to California, the US Environmental Protection Agency (EPA), and others for review. A list of the other DOE sites preparing CSTPs is included in Appendix 1.1 of this document. Please note that Appendix 1.1 appears as Appendix A, pages A-1 and A-2 in this document.

Not Available

1993-10-01T23:59:59.000Z

76

Radiation Protection Act (Pennsylvania)  

Energy.gov (U.S. Department of Energy (DOE))

This Act combines the radiation safety provisions of The Atomic Energy Development and Radiation Control Act and the Environmental Radiation Protection Act, and empowers the Department of...

77

Environmental Assessment and Corrective Measures Study Report for Remediating Contamination at Lawrence Berkeley National Laboratory Regulated under the Resource Conservation and Recovery Act  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27 27 Environmental Assessment and Corrective Measures Study Report for Remediating Contamination at Lawrence Berkeley National Laboratory Regulated under the Resource Conservation and Recovery Act September 2005 United States Department of Energy Office of Environmental Management Office of Science EA & RCRA CMS Report i September 2005 CONTENTS Page LIST OF ABBREVIATIONS...................................................................................................... viii EXECUTIVE SUMMARY .............................................................................................................x SECTION 1 INTRODUCTION .............................................................................................1 1.1 PURPOSE AND SCOPE..........................................................................1

78

ARM - Recovery Act Instruments  

NLE Websites -- All DOE Office Websites (Extended Search)

ActRecovery Act Instruments ActRecovery Act Instruments Recovery Act Logo Subscribe FAQs Recovery Act Instruments Recovery Act Fact Sheet March 2010 Poster (PDF, 10MB) External Resources Recovery Act - Federal Recovery Act - DOE Recovery Act - ANL Recovery Act - BNL Recovery Act - LANL Recovery Act - PNNL Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Recovery Act Instruments These pages provide a breakdown of the new instruments planned for installation among the permanent and mobile ARM sites. In addition, several instruments will be purchased for use throughout the facility and deployed as needed. These are considered "facility spares" and are included in the table below. View All | Hide All ARM Aerial Facility Instrument Title Instrument Mentor Measurement Group Measurements

79

Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order  

Science Conference Proceedings (OSTI)

This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system.

Evans, Susan Kay; Orchard, B. J.

2002-01-01T23:59:59.000Z

80

JGI - IMG-ACT  

NLE Websites -- All DOE Office Websites (Extended Search)

Education Microbial Genome Analysis Microbial Functional Genomics IMG-ACT IMG Annotation Collaboration Toolkit (IMG-ACT) is a multi-platform toolkit created to assist instructors...

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

NO FEAR Act Notice  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy's notice for the No FEAR Act. To learn more about the No FEAR Act, visit this page.

82

Freedom of Information Act (FOIA) and Privacy Act Requests |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Freedom of Information Act (FOIA) and Privacy Act Requests Freedom of Information Act (FOIA) and Privacy Act Requests Calibration Facilities Ecosystem Management Team Environmental...

83

Coastal Management Act (Georgia)  

Energy.gov (U.S. Department of Energy (DOE))

The Coastal Management Act provides enabling authority for the State to prepare and administer a coastal management program. The Act does not establish new regulations or laws; it is designed to...

84

NIST Organic Act  

Science Conference Proceedings (OSTI)

... brush fires, fires underground, oil blowout fires ... Personnel Act of 1970 who are ... and manufacturing techniques, including supply chain integration ...

2013-02-14T23:59:59.000Z

85

Resource Conservation and Recovery Act (RCRA) Part B permit application for container storage units at the Oak Ridge Y-12 Plant  

Science Conference Proceedings (OSTI)

This document contains Part B of the Permit Application for Container Storage Units at the Oak Ridge Y-12 Plant. Sections cover the following areas: Facility description; Waste characteristics; Process information; Ground water monitoring; Procedures to prevent hazards; Contingency plan; Personnel training; Closure plan, post closure plan, and financial requirements; Recordkeeping; Other federal laws; Organic air emissions; Solid waste management units; and Certification.

Not Available

1994-08-01T23:59:59.000Z

86

Resource Conservation and Recovery Act (RCRA) General Contingency Plan for Hazardous Waste Treatment, Storage, and Disposal Units at the Oak Ridge Y-12 Plant  

SciTech Connect

This contingency plan provides a description of the Y-12 plant and its waste units and prescribes control procedures and emergency response procedures. It lists emergency and spill response equipment, provides information on coordination agreements with local agencies, and describes the evacuation plan and reporting requirements.

1999-04-01T23:59:59.000Z

87

FOIA/Privacy Act  

NLE Websites -- All DOE Office Websites (Extended Search)

Freedom of Information Act/Privacy Act Freedom of Information Act/Privacy Act The Oak Ridge Office of Chief Counsel is responsible for administering policies, programs, and procedures to ensure DOE compliance with the Freedom of Information Act (FOIA) and the Privacy Act (PA), 5 U.S.C. 552 and 5 U.S.C. 552a, respectively. DOE continuously gathers site specific information about its facilities and record repositories. Links to DOE sites and major contractors are found at Energy.gov. The resources on these pages are provided to aid in finding answers to your questions about programs of the Department of Energy and to obtain information that is publicly available without submitting a FOIA request. If the information is not available here or on another Department website, submit a Freedom of Information Act request electronically.

88

Surveillance Guide - ERS 14.1 Satellite Accumulation Ares (RCRA Compliance)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SATELLITE ACCUMULATION AREAS SATELLITE ACCUMULATION AREAS 1.0 Objective The objective of this surveillance is to evaluate the effectiveness of the contractor's management of hazardous and mixed wastes in satellite accumulation areas. The Facility Representative evaluates compliance with DOE requirements as well as requirements of the Resource Conservation and Recovery Act and the Washington State Administrative Code. During this surveillance, the Facility Representative conducts a walk through of a satellite accumulation area and reviews the pertinent records. 2.0 References 2.1 40 CFR 260-270 2.2 Washington Administrative Code, Chapters 173-303 2.3 DOE 5400.3, Hazardous and Radioactive Mixed Waste Program 2.4 DOE 5820.2A, Radioactive Waste Management. 2.5 DOE/EH - 0333, Management of Hazardous Waste

89

Recovery Act Open House  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act Open House North Wind Environmental was one of three local small businesses that received Recovery Funding for projects at DOE's Idaho Site. Members of the community...

90

Price-Anderson Act  

Energy.gov (U.S. Department of Energy (DOE))

The Price-Anderson Act (PAA) provides a system of indemnification for legal liability resulting from a nuclear incident in connection with contractual activity for DOE.

91

ARM - Recovery Act  

NLE Websites -- All DOE Office Websites (Extended Search)

Act were deployed with the ARM second mobile facility (AMF2) in Steamboat Springs, Colorado. Led by the AMF2 team from Argonne National Laboratory, installation activities began...

92

Stormwater Management Act (Pennsylvania)  

Energy.gov (U.S. Department of Energy (DOE))

The policy and purpose of this act is to encourage planning and management of storm water runoff in each watershed consistent with sound water and land use practices.

93

PAPERWORK REDUCTION ACT SUBMISSION  

U.S. Energy Information Administration (EIA)

19. Certification for Paperwork Reduction Act Submissions On behalf of this Federal agency, I certify that the collection of information encompassed ...

94

Recovery Act Recipient Reporting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Grid Investment Grant Recipients Smart Grid Investment Grant Recipients November 19, 2009 1 Outline of Presentation * OMB Reporting Requirements * Jobs Guidance * FR.gov 2 Section 1512 of American Reinvestment and Recovery Act Outlines Recipient Reporting Requirements "Recipient reports required by Section 1512 of the Recovery Act will answer important questions, such as: ▪ Who is receiving Recovery Act dollars and in what amounts? ▪ What projects or activities are being funded with Recovery Act dollars? ▪ What is the completion status of such projects or activities and what impact have they had on job creation and retention?" "When published on www.Recovery.gov, these reports will provide the public with an unprecedented level of transparency into how Federal dollars are being spent and will help drive accountability for the timely,

95

CRSP Act of 1956  

NLE Websites -- All DOE Office Websites (Extended Search)

Act of 1956 Act of 1956 An act to authorize the Secretary of the Interior to construct, operate, and maintain the Colorado River storage project and participating projects, and for other purposes. (Act of April 11, 1956, ch. 203, 70 Stat. 105) [Sec. 1. Colorado River storage project.] -- In order to initiate the comprehensive development of the water resources of the Upper Colorado River Basin for the purposes, among others, of regulating the flow of the Colorado River storing water for beneficial consumptive use, making it possible for the States of the Upper Basin to utilize, consistently with the provisions of the Colorado River Compact, the apportionments made to and among them in the Colorado River Compact and the Upper Colorado River Basin Compact, respectively providing for the reclamation of arid and semiarid land, for the control of floods and for the generation of hydroelectric power, as an incident to the foregoing purposes, the Secretary of the Interior is hereby authorized:

96

Freedom of Information Act  

NLE Websites -- All DOE Office Websites (Extended Search)

FOIA FOIA Freedom of Information Act (FOIA) If you would like additional information related to your request you should contact the FOIA Requester Service Center at this location. If you submitted your request to another component of the DOE, or if you submitted a request to this office and it has been transferred to a component of the Department to be processed, please contact the FOIA Requester Service Center at that location. You may access the telephone number to the appropriate FOIA Requester Service Center at http://energy.gov/management/office-management/operational-management/freedom-information-act/foia-contacts. Code of Federal Regulations (CFR) for the Freedom of Information Act is 10 CFR 1004 Freedom of Information Act of 1966 and Amendments (as of Jan. 2, 1991)

97

Energy and Water Act  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Acquisition Letter 2004-02 - FY 2004 Le2islation Provisions (dated March 1.2004) Acquisition Letter 2004-02 - FY 2004 Le2islation Provisions (dated March 1.2004) Energy and Water Act AL-2004-02 provides guidance regarding the implementation of Section 30 I. 304. 307. 501,502, and Legislative Direction as provided in the Energy and Water Development Appropriation:) Act Pub. L, 108-137, also known as the E&W Act. RFP's for unfunded programs, UseJ' facilities, lobbying restrictions, and purchase of American made products are carried ovc:r from the FY 2003 Energy and Water Development Appropriations Act Pub, L, 108-7 {Division D), However, while the provision regarding competition still exists in the F'" 2004 legislation, the direction provided by Congress regarding the extend/compete process for 5 Management and Operating (M&O)contracts is

98

Evaluation of the impact of RCRA amendments on waste-to-energy activities by using a system simulation computer code  

DOE Green Energy (OSTI)

The primary methodology that is used for disposal of municipal solid waste is the use of land fills; 80--85% of the municipal solid waste (MSW) produced in the country currently is land filled. The two other disposal alternatives used are recycling and incineration. Waste-to-energy technology (WTE) which incinerates MSW to produce electricity and/or steam is attractive in other cases since it reduces landfill volume, reduces the consumption of fossil and other fuels, and produces a revenue stream from the sale of the electricity or steam. The gaseous effluents from landfills can also be used to fuel power plants. Recycling and material separation programs can have a substantial impact on the throughput and heating value of MSW collected and thus impact WTE plant economics; the magnitude of the impact will depend upon a number of factors such as what materials and what fraction are separated and recycled, the design of the WTE plant itself (its operating window); the contractual arrangements relative to maintaining throughput (ability to adjust catchment area), limitations on adjusting tipping fees, etc. Mandated increased recycling and landfill gaseous effluent control -- could alter substantially the economics and competitive position of the MSW-WTE industry. The objectives of this study are: (1) to simulate typical WTE plants fired with a national average waste stream, (2) to evaluate the parametric effects of waste component recycling on the performance of the typical WTE plants, and (3) to assess the impact of RCRA recycling amendments on the performance of the typical WTE plants and on the potential methane generation of typical landfills. The relevant technical issues, technical approach, results and conclusions are presented.

Chang, S.L.; Petrick, M.; Stodolsky, F.; Freckmann, A.B.

1994-09-01T23:59:59.000Z

99

American Recovery and Reinvestment Act Information Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery and Reinvestment Act Recovery and Reinvestment Act Information Services American Recovery and Reinvestment Act American Recovery and Reinvestment Act Information Services American Recovery and Reinvestment Act American Recovery and Reinvestment Act Information Services American Recovery and Reinvestment Act American Recovery and Reinvestment Act American Recovery and Reinvestment Act American Recovery and Reinvestment Act American Recovery and Reinvestment Act American Recovery and Reinvestment Act American Recovery and Reinvestment Act American Recovery and Reinvestment Act American Recovery and Reinvestment Act American Recovery and Reinvestment Act American Recovery and Reinvestment Act American Recovery and Reinvestment Act American Recovery and Reinvestment Act American Recovery and Reinvestment Act

100

ACT Update | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACT Update ACT Update ACT September 2011.pdf More Documents & Publications C-340 Complex D&D Final Lessons Learned (Post CD-4), Environmental Management Cleanup, Sep 2011 Plain...

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

The Affordable Care Act:  

NLE Websites -- All DOE Office Websites (Extended Search)

Affordable Care Act: Affordable Care Act: Preventive Services at 100% Preventive Care Services Covered Without Cost-sharing - Without Copay, Coinsurance or Deductible The Affordable Care Act requires non-grandfathered health plans and policies to provide coverage for "preventive care services" 1 without cost-sharing (such as coinsurance, deductible or copayment), when the member uses a network provider. Services may include screenings, immunizations, and other types of care, as recommended by the federal government. Blue Cross and Blue Shield of New Mexico (BCBSNM) is committed to implementing coverage changes to meet ACA requirements as well as the needs and expectations of our members. General Highlights of New Regulations * Applies to group health plans including insured and self-

102

Massachusetts Clean Air Act (Massachusetts)  

Energy.gov (U.S. Department of Energy (DOE))

The Act contains regulations to prevent the pollution and contamination of the atmosphere. The Act establishes a contiguous metropolitan pollution control district, comprised of towns in the...

103

American Recovery and Reinvestment Act  

Energy.gov (U.S. Department of Energy (DOE))

Here is one compliance agreement for EMs American Recovery and Reinvestment Act Program on accelerated milestones for the Recovery Act program.

104

Recovery Act State Summaries | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act State Summaries Recovery Act State Summaries Recovery Act State Summaries Alabama Recovery Act State Memo Alaska Recovery Act State Memo American Samoa Recovery Act State Memo Arizona Recovery Act State Memo Arkansas Recovery Act State Memo California Recovery Act State Memo Colorado Recovery Act State Memo Connecticut Recovery Act State Memo Delaware Recovery Act State Memo District of Columbia Recovery Act State Memo Florida Recovery Act State Memo Georgia Recovery Act State Memo Guam Recovery Act State Memo Hawaii Recovery Act State Memo Idaho Recovery Act State Memo Illinois Recovery Act State Memo Indiana Recovery Act State Memo Iowa Recovery Act State Memo Kansas Recovery Act State Memo Kentucky Recovery Act State Memo Louisiana Recovery Act State Memo Maine Recovery Act State Memo

105

Rehabilitation Act of 1973  

Energy.gov (U.S. Department of Energy (DOE))

In accordance with Section 504 of the Rehabilitation Act of 1973, as amended, Public Law 93-112, the Department of Energy will provide Interpreters for the Deaf/Hard of Hearing, Readers for the Blind, and Personal Assistants for Physically Disabled Headquarters employees and visitors either via the Headquarters staff interpreter or a qualified vendor.

106

RCRA Section 6002  

NLE Websites -- All DOE Office Websites (Extended Search)

items designated in such guidelines shall procure such items composed of the highest percentage of recovered materials practicable (and in the case of paper, the highest percentage...

107

WIPP RCRA Documents menu  

NLE Websites -- All DOE Office Websites (Extended Search)

of the Transuranic Waste Characterization Task Force Final Report EEG Response to NAS WIPP Committee Questions for May 19, 2003 Meeting Quality Assurance Program Document Rev. 9...

108

National Environmental Policy Act  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Policy Act Environmental Policy Act to. # LM-24-10 Legacy Management Project/Activity: Abandon four monitoring wells associated with the Rocky Flats, CO~ Site. A. Brief Projecti Activity Description The U.S. Department of Energy (DOE) Office of Legacy Management (LM) proposes to abandon four groundwater monitoring wells that were installed in the 1990s near the Rocky Flats, Colorado, Site. Three of the wells are adjacent to the Great Western Reservoir, and one is adjacent to Standley Lake; the attached map shows the well locations. Wells 11994~ 11894; and 49192 are in the city of Broomfield, and well 49292 is in the city of Westminster. The wells are no longer needed for groundwater monitoring purposes and are scheduled to be abandoned before the end of 20 1 0 and in accordance with regulations

109

National Environmental Policy Act  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Policy Act (NEPA) Environmental Policy Act (NEPA) Public inquiries should be directed to: Gary S. Hartman DOE ORO NEPA Compliance Officer P.O. Box 2001, SE-32 Oak Ridge, TN 37831 (865) 576-0273 hartmangs@oro.doe.gov *Categorical Exclusion Determination Documents (CX Determinations): Date Title Reference No. Program 02/01/2010 Receipt and Processing of TRU Soils from Nuclear Fuel Services (NFS) in Erwin, Tennessee by the Transuranic (TRU) Waste Processing Center (TWPC) on the Oak Ridge Reservation, Tennessee CX-TWPC-09-0001 EM 02/01/2010 Conducting Macroencapsulation Treatment in the Parking Lot of the Contact Handled Marshalling Building (CHMB) at the TRU Waste Processing Center (TWPC) on the Oak Ridge Reservation, Tennessee CX-TWPC-09-0003 EM 03/02/2010 East Campus Parking Structure at the Oak Ridge National Laboratory (ORNL)

110

and Acting NOAA Administrator  

NLE Websites -- All DOE Office Websites (Extended Search)

30 30 th 9:00-9:30 Welcome * Dr. Kathryn Sullivan, Acting Under Secretary of Commerce for Oceans and Atmosphere and Acting NOAA Administrator 9:30-10:30 What does Open Data Look Like? This session will provide some case studies of the use of open data to illustrate some of the issues associated with presentation of the data in a way which optimises its usefulness for end-users. It will consider different types of data, guiding principles, and different uses of data, including both research data and national agricultural data-sets. Moderator: * Tim Benton, Champion, UK Global Food Security Programme, UK Speakers: * Johannes Keizer, Team Leader, FAO United Nations, Italy * Dr. Sander Janssen, Wageningen, Netherlands * Dr. Rajeev Varshney, Director, Center of Excellence in Genomics (CEG), ICRISAT, Hyderabad,

111

Fermilab | Recovery Act | Videos  

NLE Websites -- All DOE Office Websites (Extended Search)

Videos Videos Watch videos documenting progress on Fermilab projects funded by the American Recovery and Reinvestment Act. NOvA - Community Voices - September 2009 Residents of northern Minnesota and construction workers building the NOvA detector facility discuss the benefits the high-energy physics research project has brought their communities. Congressman Bill Foster at Fermilab Congressman Bill Foster speaks to Fermilab Technical Division employees and members of the media at a press conference on Wednesday, August 5 to announce an additional $60.2 million in Recovery Act funds for the lab. NOvA first blast On July 20, construction crews began blasting into the rock at the future site of the NOvA detector facility in northern Minnesota. NOvA groundbreaking ceremony

112

Fermilab | Recovery Act | Features  

NLE Websites -- All DOE Office Websites (Extended Search)

Features - Archive Features - Archive photo Industrial Building 3 addition Fermilab Today-November 5, 2010 IB3 addition nears completion The future site of Fermilab’s new materials laboratory space has evolved from a steel outline to a fully enclosed building over the past five months. Read full column photo Fermilab Today-October 22, 2010 Recovery Act gives LBNE team chance to grow Thanks to funding from the American Recovery and Reinvestment Act, the collaboration for the Long-Baseline Neutrino Experiment, LBNE, has expanded its project team. Read full column photo cooling units Fermilab Today-October 15, 2010 Local company completes FCC roof construction A local construction company recently completed work on the roof of the Feynman Computing Center, an important step in an ongoing project funded by

113

Microsoft Word - NNSA Act 100110  

National Nuclear Security Administration (NNSA)

October 1, 2010 October 1, 2010 Source: Title XXXII of the National Defense Authorization Act for Fiscal Year 2000, Pub. L. 106-65, as amended by the Energy and Water Development Appropriations Act, 2001, Pub. L. 106-377; the Floyd D. Spence National Defense Authorization Act for Fiscal Year 2001, Pub. L. 106-398; the National Defense Authorization Act for Fiscal Year 2002, Pub. L. 107-107; the National Defense Authorization Act for Fiscal Year 2004, Pub. L. 108-136; the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005, Pub. L. 108- 375; the Energy Policy Act of 2005, Pub. L. 109-58; the John Warner National Defense Authorization Act for Fiscal Year 2007, Pub. L. 109-364; the National Defense Authorization Act for Fiscal Year 2008, Pub. L. 110-181; the Duncan Hunter National

114

HWMA/RCRA Closure Plan for the TRA Fluorinel Dissolution Process Mockup and Gamma Facilities Waste System  

Science Conference Proceedings (OSTI)

This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan was developed for the Test Reactor Area Fluorinel Dissolution Process Mockup and Gamma Facilities Waste System, located in Building TRA-641 at the Reactor Technology Complex (RTC), Idaho National Laboratory Site, to meet a further milestone established under the Voluntary Consent Order SITE-TANK-005 Action Plan for Tank System TRA-009. The tank system to be closed is identified as VCO-SITE-TANK-005 Tank System TRA-009. This closure plan presents the closure performance standards and methods for achieving those standards.

K. Winterholler

2007-01-31T23:59:59.000Z

115

Freedom of Information Act/Privacy Act Requests | National Nuclear...  

National Nuclear Security Administration (NNSA)

Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Freedom of Information ActPrivacy Act Requests Home > About Us > Our Operations > NNSA Office of General...

116

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act Recovery Act Recovery Act Center Map PERFORMANCE The Department estimates the $6 billion Recovery Act investment will allow us to complete work now that would cost approximately $13 billion in future years, saving $7 billion. As Recovery Act work is completed through the cleanup of contaminated sites, facilities, and material disposition, these areas will becoming available for potential reuse by other entities. Recovery Act funding is helping the Department reach our cleanup goals faster. Through the end of December 2012, EM achieved a total footprint reduction of 74%, or 690 of 931 square miles. EM achieved its goal of 40% footprint reduction in April 2011, five months ahead of schedule. Recovery Act payments exceeded $5.9 billion in December 2012. Recovery Act

117

Montana Radon Control Act (Montana)  

Energy.gov (U.S. Department of Energy (DOE))

The Radon Control Act regulates the emission of radon, the gaseous decay products of uranium or thorium. The Act addresses operator certification of radon-producing facilities, testing and...

118

Solid Waste Act (New Mexico)  

Energy.gov (U.S. Department of Energy (DOE))

The main purpose of the Solid Waste Act is to authorize and direct the establishment of a comprehensive solid waste management program. The act states details about specific waste management...

119

Clean Water Legacy Act (Minnesota)  

Energy.gov (U.S. Department of Energy (DOE))

This Act provides authority, direction, and resources to achieve and maintain water quality standards for groundwater and surface waters by implementing the federal Clean Water Act as well as...

120

Pollution Control Act (South Carolina)  

Energy.gov (U.S. Department of Energy (DOE))

This Act declares the maintenance of reasonable standards of purity of air and water to be the public policy of the state. The Act authorizes the Department of Health and Environmental Control to...

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Borehole Data Package for Four CY 2003 RCRA Wells 299-E27-4, 299-E27-21, 299-E27-22, and 299-E27-23 at Single-Shell Tank, Waste Management Area C, Hanford Site, Washington  

Science Conference Proceedings (OSTI)

Four new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed at the single-shell tank farm Waste Management Area (WMA) C in fiscal year 2003 to fulfill commitments for well installations proposed in the draft Hanford Federal Facility Agreement and Consent Order milestone M-24-00. Well 299-E27-22, installed upgradient, was drilled through the entire uppermost unconfined aquifer to the basalt and wells 299-E27-4, 299-E27-21 and 299-E27-23 were drilled approximately 40 feet into the uppermost unconfined aquifer and installed downgradient of the WMA. Specific objectives for these wells include monitoring the impact, if any, that potential releases from inside the WMA may have on current groundwater conditions (i.e., improved network coverage) and differentiating upgradient groundwater contamination from contaminants released at the WMA. This report supplies the information obtained during drilling, characterization, and installation of the four new groundwater monitoring wells. This document also provides a compilation of hydrogeologic and well construction information obtained during drilling, well development, aquifer testing, and sample collection/analysis activities.

Williams, Bruce A.; Narbutovskih, Susan M.

2004-05-12T23:59:59.000Z

122

Fermilab | Recovery Act  

NLE Websites -- All DOE Office Websites (Extended Search)

NOvA NOvA In April 2010, workers set up two cranes at the construction site for the NOvA detector facility in Ash River, Minnesota. In 2009, the U.S. Department of Energy's Office of Science, under the American Recovery and Reinvestment Act, provided DOE's Fermi National Accelerator Laboratory with $114.2 million. Fermilab invested the funds in critical scientific infrastructure to strengthen the nation's global scientific leadership as well as to provide immediate economic relief to local communities. This Web site provided citizens with clear and accurate information about how Fermilab used the new funding and its immediate benefits for our neighbors and our nation. Features photo Industrial Building 3 addition Fermilab Today-November 5, 2010 IB3 addition nears completion

123

Triple acting radial seal  

SciTech Connect

A triple acting radial seal used as an interstage seal assembly in a gas turbine engine, where the seal assembly includes an interstage seal support extending from a stationary inner shroud of a vane ring, the interstage seal support includes a larger annular radial inward facing groove in which an outer annular floating seal assembly is secured for radial displacement, and the outer annular floating seal assembly includes a smaller annular radial inward facing groove in which an inner annular floating seal assembly is secured also for radial displacement. A compliant seal is secured to the inner annular floating seal assembly. The outer annular floating seal assembly encapsulates the inner annular floating seal assembly which is made from a very low alpha material in order to reduce thermal stress.

Ebert, Todd A (West Palm Beach, FL); Carella, John A (Jupiter, FL)

2012-03-13T23:59:59.000Z

124

Sikes Act | Open Energy Information  

Open Energy Info (EERE)

Sikes Act Sikes Act Jump to: navigation, search Statute Name Sikes Act Year 1960 Url [[File:|160px|link=http://en.wikipedia.org/wiki/Sikes_Act]] Description The Sikes Act (16 USC 670a-670o, 74 Stat. 1052), was enacted into United States law on September 15, 1960. It provides for cooperation by the Department of the Interior and Department of Defense with State agencies in planning, development and maintenance of fish and wildlife resources on military reservations throughout the United States. References Sikes Act[1] The Sikes Act recognizes the importance and value of military lands to natural resources. It seeks to ensure that these ecosystems are protected and enhanced while allowing the military lands to continue to meet the needs of military operations.

125

Recovery Act | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Act Act Recovery Act Total Federal Payments to OE Recovery Act Recipients by Month, through November 30, 2013 Total Federal Payments to OE Recovery Act Recipients by Month, through November 30, 2013 American Recovery and Reinvestment Act Overview PROJECTS TOTAL OBLIGATIONS AWARD RECIPIENTS Smart Grid Investment Grant $3,482,831,000 99 Smart Grid Regional and Energy Storage Demonstration Projects $684,829,000 42 Workforce Development Program $100,000,000 52 Interconnection Transmission Planning $80,000,000 6 State Assistance for Recovery Act Related Electricity Policies $48,619,000 49 Enhancing State Energy Assurance $43,500,000 50 Enhancing Local Government Energy Assurance $8,024,000 43 Interoperability Standards and Framework $12,000,000 1 Program Direction1 $27,812,000 --

126

The Privacy Act of 1974  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Privacy Act of 1974 Privacy Act of 1974 The Privacy Act of 1974, 5 U.S.C. §552a, governs an agency's collection, storage, and use of information about an individual. The Privacy Act protects the privacy of individuals by establishing fair information practices for the collection, maintenance, use, and dissemination of information by federal agencies. Frequently Asked Questions Who is an individual for the purposes of the Privacy Act? A (living) citizen of the United States or an alien lawfully admitted for permanent legal residence.  Deceased individuals are not covered by the Privacy Act, and their executors or next-of- kin can not pursue a Privacy Act claim on their behalf.

127

Recovery Act: State Assistance for Recovery Act Related Electricity...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Section 1222 of the Energy Policy Act 2005 International Electricity Regulation Presidential Permits Export Authorizations Pending Applications NEPA Other Regulatory...

128

Double acting bit holder  

DOE Patents (OSTI)

A double acting bit holder that permits bits held in it to be resharpened during cutting action to increase energy efficiency by reducing the amount of small chips produced. The holder consist of: a stationary base portion capable of being fixed to a cutter head of an excavation machine and having an integral extension therefrom with a bore hole therethrough to accommodate a pin shaft; a movable portion coextensive with the base having a pin shaft integrally extending therefrom that is insertable in the bore hole of the base member to permit the moveable portion to rotate about the axis of the pin shaft; a recess in the movable portion of the holder to accommodate a shank of a bit; and a biased spring disposed in adjoining openings in the base and moveable portions of the holder to permit the moveable portion to pivot around the pin shaft during cutting action of a bit fixed in a turret to allow front, mid and back positions of the bit during cutting to lessen creation of small chip amounts and resharpen the bit during excavation use.

Morrell, Roger J. (Blommington, MN); Larson, David A. (Minneapolis, MN); Ruzzi, Peter L. (Eagan, MN)

1994-01-01T23:59:59.000Z

129

Energy Employees Occupational Illness Compensation Program Act...  

Office of Science (SC) Website

Energy Employees Occupational Illness Compensation Program Act (EEOICPA) Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act...

130

COLORADO RECOVERY ACT SNAPSHOT | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COLORADO RECOVERY ACT SNAPSHOT COLORADO RECOVERY ACT SNAPSHOT The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and...

131

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Economy » Recovery Act Energy Economy » Recovery Act Recovery Act December 18, 2013 BPA Wins Platts Global Energy Award for Grid Optimization Platts awarded the Bonneville Power Administration (BPA) a Global Energy Award for grid optimization on December 12 in New York City for its development of a synchrophasor network. BPA is part of the Recovery Act-funded Western Interconnection Synchrophasor Program. December 13, 2013 Cumulative Federal Payments to OE Recovery Act Recipients, through November 30, 2013 Graph of cumulative Federal Payments to OE Recovery Act Recipients, through November 30, 2013. December 12, 2013 Energy Department Announces $150 Million in Tax Credits to Invest in U.S. Clean Energy Manufacturing Domestic Manufacturing Projects to Support Renewable Energy Generation as

132

Recovery Act State Memos Louisiana  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Louisiana Louisiana For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

133

Recovery Act State Memos Alabama  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alabama Alabama For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

134

Recovery Act State Memos Oklahoma  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oklahoma Oklahoma For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

135

Recovery Act State Memos Massachusetts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Massachusetts Massachusetts For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

136

Recovery Act State Memos Mississippi  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mississippi Mississippi For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

137

Recovery Act State Memos Wyoming  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wyoming Wyoming For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 ELECTRIC GRID ........................................................................................................ 4

138

Recovery Act State Memos Connecticut  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Connecticut Connecticut For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

139

Recovery Act State Memos Oregon  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oregon Oregon For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 4 RENEWABLE ENERGY ............................................................................................. 5

140

Recovery Act State Memos Utah  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utah Utah For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Recovery Act State Memos Nebraska  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nebraska Nebraska For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

142

Recovery Act State Memos Alaska  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Alaska For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

143

Recovery Act State Memos Arkansas  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Arkansas Arkansas For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

144

Recovery Act State Memos Indiana  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Indiana Indiana For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

145

Recovery Act State Memos Guam  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guam Guam For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 ELECTRIC GRID ........................................................................................................ 4

146

Recovery Act State Memos Iowa  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Iowa Iowa For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

147

Recovery Act State Memos Georgia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Georgia Georgia For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

148

Recovery Act State Memos Minnesota  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Minnesota Minnesota For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

149

Recovery Act State Memos Idaho  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Idaho For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

150

Recovery Act State Memos Illinois  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Illinois Illinois For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 7

151

Recovery Act State Memos Pennsylvania  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pennsylvania Pennsylvania For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................ 3 RENEWABLE ENERGY ......................................................................................... 7

152

Recovery Act State Memos Wisconsin  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wisconsin Wisconsin For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 6

153

Recovery Act State Memos Montana  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Montana Montana For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

154

Recovery Act State Memos Arizona  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Arizona Arizona For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

155

Recovery Act State Memos Kansas  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kansas Kansas For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

156

Recovery Act State Memos California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

California California For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY .............................................................................................. 3 RENEWABLE ENERGY ............................................................................................ 12

157

Recovery Act State Memos Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington Washington For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 6

158

Recovery Act State Memos Nevada  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada Nevada For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ................................................................................................ 1 RENEWABLE ENERGY ............................................................................................. 5

159

Recovery Act State Memos Virginia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Virginia Virginia For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

160

Recovery Act State Memos Maine  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maine Maine For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Recovery Act State Memos Missouri  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Missouri Missouri For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

162

Recovery Act State Memos Maryland  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maryland Maryland For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ....................................................................................................... 3 RENEWABLE ENERGY ..................................................................................................... 4

163

Recovery Act State Memos Colorado  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Colorado Colorado For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 6

164

Recovery Act State Memos Texas  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Texas Texas For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 7

165

Recovery Act State Memos Vermont  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vermont Vermont For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................ 4

166

Recovery Act State Memos Michigan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Michigan Michigan For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

167

Recovery Act State Memos Tennessee  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tennessee Tennessee For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

168

Recovery Act State Memos Hawaii  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hawaii Hawaii For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

169

Massachusetts Clean Waters Act (Massachusetts)  

Energy.gov (U.S. Department of Energy (DOE))

This Act establishes a Division of Water Pollution Control within the Massachusetts Department of Environmental Protection. The Division is responsible for establishing a program for the prevention...

170

Coal Mine Safety Act (Virginia)  

Energy.gov (U.S. Department of Energy (DOE))

This Act is the primary legislation pertaining to coal mine safety in Virginia. It contains information on safety rules, safety standards and required certifications for mine workers, prohibited...

171

Solid Waste Management Act (Pennsylvania)  

Energy.gov (U.S. Department of Energy (DOE))

This Act provides for the planning and regulation of solid waste storage, collection, transportation, processing, treatment, and disposal. It requires that municipalities submit plans for municipal...

172

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research and Commercialization New green jobs a benefit of effort to end dependence on foreign oil April 29, 2009 Secretary Chu Announces 93 Million from Recovery Act to...

173

National Environmental Policy Act (NEPA)  

Energy.gov (U.S. Department of Energy (DOE))

All Electricity Delivery and Energy Reliability (OE) projects are reviewed under the National Environmental Policy Act (NEPA) of 1969 42 U.S.C. Section 4321 et seq.

174

Recovery Act | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

175

Montana Rangeland Resources Act (Montana)  

Energy.gov (U.S. Department of Energy (DOE))

The Montana Rangeland Resources Act establishes a program of rangeland management, to preserve Montana rangeland for livestock, wildlife habitat, high-quality water production, pollution control,...

176

Recovery Act State Memos Delaware  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

weatherization efforts in the state, creating jobs, reducing carbon emissions, and saving money for Delaware's low-income families. Over the course of the Recovery Act,...

177

State Environmental Policy Act (SEPA) Environmental Checklist Form 216-B-3 Expansion Ponds Closure Plan. Revision 1  

SciTech Connect

The 216-B-3 Expansion Ponds Closure Plan (Revision 1) consists of a Part A Dangerous Waste Permit Application and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. The 216-B-3 Pond System consists of a series of four earthen, unlined, interconnected ponds and the 216-B-3-3 Ditch that receive waste water from various 200 East Area operating facilities. These four ponds, collectively. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the 216-B-3-3 Ditch. Water discharged to the 216-8-3-3 Ditch flows directly into the 216-B-3 Pond. In the past, waste water discharges to B Pond and the 216-B-3-3 Ditch contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the nonradioactive dangerous portion of mixed waste is regulated under RCRA. Mixed waste also may be considered a hazardous substance under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) when considering remediation of waste sites.

1993-12-01T23:59:59.000Z

178

Recovery Act: State Assistance for Recovery Act Related Electricity  

NLE Websites -- All DOE Office Websites (Extended Search)

State State Assistance for Recovery Act Related Electricity Policies Recovery Act: State Assistance for Recovery Act Related Electricity Policies $44 Million for State Public Utility Commissions State public utility commissions (PUCs), which regulate and oversee electricity projects in their states, will be receiving more than $44.2 million in Recovery Act funding to hire new staff and retrain existing employees to ensure they have the capacity to quickly and effectively review proposed electricity projects. The funds will help the individual state PUCs accelerate reviews of the large number of electric utility requests that are expected under the Recovery Act. State PUCs will be reviewing electric utility investments in projects such as energy efficiency, renewable energy, carbon capture and storage, transmission

179

Nuclear Waste Policy Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Waste Policy Act Nuclear Waste Policy Act Document on the Nuclear Waste Policy Act of 1982 An Act to provide for the development of repositories for the disposal of...

180

Water Resources Restoration and Preservation Act (Florida) |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Resources Restoration and Preservation Act (Florida) Water Resources Restoration and Preservation Act (Florida) Eligibility Agricultural Commercial Construction Developer...

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Canadian Environmental Protection Act 2012 (Canada) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Canadian Environmental Protection Act 2012 (Canada) Canadian Environmental Protection Act 2012 (Canada) Eligibility Agricultural Commercial Construction Developer Fed. Government...

182

Recovery Act State Memos Ohio  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20 20 For total Recovery Act jobs numbers in Ohio go to www.recovery.gov DOE Recovery Act projects in Ohio: 83 U.S. DEPARTMENT OF ENERGY * OHIO RECOVERY ACT SNAPSHOT The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Ohio are supporting a broad range of clean energy projects from the smart grid and energy efficiency to advanced battery manufacturing, biofuels, carbon capture and storage, and cleanup of the state's Cold War legacy nuclear sites Through these investments, Ohio's businesses, universities, non-profits, and local governments are creating quality jobs today and positioning Ohio to play an important role in the new energy economy of the future. EXAMPLES OF OHIO FORMULA GRANTS Program

183

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26, 2010 26, 2010 200,000 Homes Weatherized Under the Recovery Act -- Video from Cathy Zoi Vice President Biden announced that 200,000 homes have been Weatherized under the Recovery Act. Hear what Cathy Zoi, Assistant Secretary for Energy Efficiency and Renewable Energy, has to say on Weatherization. August 26, 2010 200,000 homes weatherized under the Recovery Act August 25, 2010 The Recovery Act: Cutting Costs and Upping Capacity Secretary Chu joined Vice President Joe Biden at the White House to help unveil a new report on how investments made through the Recovery Act have been impacting innovation. While the report analyzed several major sectors, its most striking findings centered on energy. August 25, 2010 Eco Technologies, Inc., hired eleven workers to install these solar panels at the Hillsborough County judicial center. | Photo courtesy of Hillsborough County

184

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2009 31, 2009 Energy Secretary Chu Announces $755 Million in Recovery Act Funding for Environmental Cleanup in Tennessee New Funding Will Create Jobs and Accelerate Cleanup Efforts March 31, 2009 Energy Secretary Chu Announces $1.615 Billion in Recovery Act Funding for Environmental Cleanup in South Carolina New Funding Will Create Jobs and Accelerate Cleanup Efforts March 31, 2009 Energy Secretary Chu Announces $138 Million in Recovery Act Funding for Environmental Cleanup in Ohio New Funding Will Create Jobs and Accelerate Cleanup Efforts March 31, 2009 Energy Secretary Chu Announces $148 million in Recovery Act Funding for Environmental Cleanup in New York New Funding Will Create Jobs and Accelerate Cleanup Efforts March 31, 2009 Energy Secretary Chu Announces $384 Million in Recovery Act Funding for

185

Hydrogen Future Act of 1996  

NLE Websites -- All DOE Office Websites (Extended Search)

4-271-OCT. 9, 1996 4-271-OCT. 9, 1996 HYDROGEN FUTURE ACT OF 1996 110 STAT. 3304 PUBLIC LAW 104-271-OCT. 9, 1996 Oct. 9, 1996 [H.R. 4138] Hydrogen Future Act of 1996. 42 USC 12401 note. 42 USC 7238 note. Public Law 104-271 104th Congress An Act To authorize the hydrogen research, development, and demonstration programs of the Department of Energy, and for other purposes. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, SECTION 1. SHORT TITLE. This Act may be cited as the ''Hydrogen Future Act of 1996''. SEC. 2. DEFINITIONS. For purposes of titles II and III- (1) the term ''Department'' means the Department of Energy; and (2) the term ''Secretary'' means the Secretary of Energy. TITLE I-HYDROGEN SEC. 101. PURPOSES AND DEFINITIONS.

186

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act Recovery Act Recovery Act The American Recovery and Reinvestment Act of 2009 -- commonly called the "stimulus" -- was designed to spur economic growth while creating new jobs and saving existing ones. Through the Recovery Act, the Energy Department invested more than $31 billion to support a wide range of clean energy projects across the nation -- from investing in the smart grid and developing alternative fuel vehicles to helping homeowners and businesses reduce their energy costs with energy efficiency upgrades and deploying carbon capture and storage technologies. The Department's programs helped create new power sources, conserve resources and aligned the nation to lead the global energy economy. Featured Leaders of the Fuel Cell Pack Fuel cell forklifts like the one shown here are used by leading companies across the U.S. as part of their daily business operations. | Energy Department file photo.

187

ARM - ARM Recovery Act Project FAQs  

NLE Websites -- All DOE Office Websites (Extended Search)

ActARM Recovery Act Project FAQs ActARM Recovery Act Project FAQs Recovery Act Logo Subscribe FAQs Recovery Act Instruments Recovery Act Fact Sheet March 2010 Poster (PDF, 10MB) External Resources Recovery Act - Federal Recovery Act - DOE Recovery Act - ANL Recovery Act - BNL Recovery Act - LANL Recovery Act - PNNL Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send ARM Recovery Act Project FAQs Why is ARM buying new instruments and equipment? The ARM Climate Research Facility (ARM) is receiving $60 million dollars in Recovery Act funding from the U.S. Department of Energy Office of Science to build the next generation facility for climate change research. Using input from past ARM user workshops and ARM working group discussion, ARM has planned for the purchase and deployment of an expansive array of new

188

Characterization of Vadose Zone Sediment: RCRA Borehole 299-E33-338 Located Near the B-BX-BY Waste Management Area  

SciTech Connect

This report was revised in September 2008 to remove acid-extractable sodium data from Table 4.8. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in June 2003. The overall goals of the of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., are: 1) to define risks from past and future single-shell tank farm activities, 2) to identify and evaluate the efficacy of interim measures, and 3) to aid via collection of geotechnical information and data, future decisions that must be made by the U.S. Department of Energy (DOE) regarding the near-term operations, future waste retrieval, and final closure activities for the single-shell tank waste management areas. For a more complete discussion of the goals of the Tank Farm Vadose Zone Project, see the overall work plan, Phase 1 RCRA Facility Investigation/Corrective Measures Study Work Plan for the Single-Shell Tank Waste Management Areas (DOE 1999). Specific details on the rationale for activities performed at the B-BX-BY tank farm waste management area are found in CH2M HILL (2000).

Lindenmeier, Clark W.; Serne, R. Jeffrey; Bjornstad, Bruce N.; Gee, Glendon W.; Schaef, Herbert T.; Lanigan, David C.; Lindberg, Michael J.; Clayton, Ray E.; Legore, Virginia L.; Kutnyakov, Igor V.; Baum, Steven R.; Geiszler, Keith N.; Brown, Christopher F.; Valenta, Michelle M.; Vickerman, Tanya S.; Royack, Lisa J.

2008-09-11T23:59:59.000Z

189

RCRA Facility investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report describes the borehole geophysical logging performed at selected monitoring wells at waste area grouping (WAG) 6 of Oak Ridge National Laboratory in support of the WAG 6 Resource Conservation and Recovery Act Facility Investigation (RFI). It identifies the locations and describes the methods, equipment used in the effort, and the results of the activity. The actual logs for each well logged are presented in Attachment 1 through 4 of the TM. Attachment 5 provide logging contractor service literature and Attachment 6 is the Oak Ridge National Laboratory (ORNL) Procedure for Control of a Nuclear Source Utilized in Geophysical logging. The primary objectives of the borehole geophysical logging program were to (1) identify water-bearing fractured bedrock zones to determine the placement of the screen and sealed intervals for subsequent installation, and (2) further characterize local bedrock geology and hydrogeology and gain insight about the deeper component of the shallow bedrock aquifer flow system. A secondary objective was to provide stratigraphic and structural correlations with existing logs for Hydraulic Head Monitoring Station (HHMS) wells, which display evidence of faulting.

Not Available

1991-09-01T23:59:59.000Z

190

No Fear Act Data | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No Fear Act Data No Fear Act Data No Fear Act Data This document contains data related to the No FEAR Act including complaint basis, processing time, complaints dismissed, and historical information. For more information about the No FEAR Act, visit http://energy.gov/diversity/services/protecting-civil-rights/no-fear-act FY 2013 First Quarter No FEAR Act FY 2012 No FEAR Act Data 2006 through 2011 No Fear Act Data Summary.pdf October 1, 2005 through September 30, 2006 No Fear Act.pdf October 1, 2003 through September 30, 2004 No Fear Act.pdf October 1, 2002 through September 30, 2003 No Fear Act.pdf October 1, 2001 through September 30, 2002 No Fear Act.pdf More Documents & Publications DOE F 1600.1 NOTIFICATION AND FEDERAL EMPLOYEE ANTIDISCRIMINATION AND RETALIATION ACT OF

191

Recovery Act | OpenEI  

Open Energy Info (EERE)

Recovery Act Recovery Act Dataset Summary Description This dataset, updated quarterly by Recovery.org, contains a breakdown of state-by-state recovery act funds awarded and received, as well as the number of jobs created and saved. The shows two periods, February 17, 2009 to December 31, 2010, and January 1, 2011 to March 31, 2011. The jobs created and saved are displayed just for January 1, 2011 to March 31, 2011. The document was downloaded from Recovery.org. It is a simple document displaying 50 states, as well as American territories. Source Recovery.org Date Released June 08th, 2011 (3 years ago) Date Updated Unknown Keywords award funding jobs Recovery Act Recovery.org Data text/csv icon recipientfundingawardedbystate.csv (csv, 5.1 KiB) Quality Metrics Level of Review Some Review

192

Recovery Act State Memos Florida  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 1, 2010 October 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5 ELECTRIC GRID ........................................................................................................ 6 TRANSPORTATION ................................................................................................. 8 CARBON CAPTURE AND STORAGE ........................................................................ 9

193

Recovery Act State Memos Florida  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 1, 2010 June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5 ELECTRIC GRID ........................................................................................................ 8 TRANSPORTATION ............................................................................................... 10 CARBON CAPTURE AND STORAGE ...................................................................... 10

194

PAPERWORK REDUCTION ACT OF 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PAPERWORK REDUCTION ACT PAPERWORK REDUCTION ACT OF 1995 U. S. DEPARTMENT OF ENERGY INFORMATION COLLECTION MANAGEMENT PROGRAM Chris Rouleau, PRA Officer Records Management Division Office of the Associate Chief Information Officer for IT Planning, Architecture and E-Government Office of the Chief Information Officer Office of the Chief Information Officer 2/16/2010 2 TOPICS  Paperwork Reduction Act (PRA) of 1995 - Law  Paperwork Reduction Act - Overview  Information Collection Requests (ICRs)  Information Collection Request Associated with A Notice of Proposed Rule Making  Program Points of Contacts  Information Collection Clearance Managers  Information Collection Requests Checklist  Drivers  Annual Information Collection Budget  Summary of What To Do  Summary of What NOT

195

Energy Policy Act of 2005  

NLE Websites -- All DOE Office Websites (Extended Search)

R. 6 One Hundred Ninth Congress of the United States of America A T T H E F I R S T S E S S I O N Begun and held at the City of Washington on Tuesday, the fourth day of January, two thousand and five An Act To ensure jobs for our future with secure, affordable, and reliable energy. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, SECTION 1. SHORT TITLE; TABLE OF CONTENTS. (a) SHORT TITLE.-This Act may be cited as the ''Energy Policy Act of 2005''. (b) TABLE OF CONTENTS.-The table of contents for this Act is as follows: Sec. 1. Short title; table of contents. TITLE I-ENERGY EFFICIENCY Subtitle A-Federal Programs Sec. 101. Energy and water saving measures in congressional buildings. Sec. 102. Energy management requirements.

196

Toxic Pollution Prevention Act (Illinois)  

Energy.gov (U.S. Department of Energy (DOE))

It is the purpose of this Act to reduce the disposal and release of toxic substances which may have adverse and serious health and environmental effects, to promote toxic pollution prevention as...

197

Nuclear Decommissioning Financing Act (Maine)  

Energy.gov (U.S. Department of Energy (DOE))

The Nuclear Decommissioning Financing Act calls for the establishment of a tax-exempt, tax-deductible decommissioning fund by the licensee of any nuclear power generating facility to pay for the...

198

Kentucky Reinvestment Act (KRA) (Kentucky)  

Energy.gov (U.S. Department of Energy (DOE))

The Kentucky Reinvestment Act (KRA) is a tax incentive available for up to 10 years from the date of final approval via tax credits of up to 100% of corporate income or limited liability entity tax...

199

Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revision 3  

Science Conference Proceedings (OSTI)

This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws.

Not Available

1993-03-01T23:59:59.000Z

200

Resource Conservation and Recovery Act corrective measures study: Area 6 decontamination pond facility, corrective action unit no. 92  

Science Conference Proceedings (OSTI)

Corrective Action Unit (CAU) No. 92, the Area 6 Decontamination Pond Facility (DPF), is an historic disposal unit located at the Nevada Test Site (NTS) in Nye County, Nevada (Figures 1 - 1, 1-2, and 1-3). The NTS is operated by the U.S. Department of Energy, Nevada Operations Office (DOE/NV), which has been required by the Nevada Division of Environmental Protection (NDEP) to characterize the DPF under the requirements of the Resource Conservation and Recovery Act (RCRA) Part A Permit (NDEP, 1995) for the NTS and Title 40 Code of Federal Regulations (CFR) Part 265 (1996c). The DPF is prioritized in the Federal Facility Agreement and Consent Order (FFACO, 1996) but is governed by the permit. The DPF was characterized through sampling events in 1994, 1996, and 1997. The results of these sampling events are contained in the Final Resource Conservation and Recovery Act Industrial Site Environmental Restoration Site Characterization Report, Area 6 Decontamination Pond Facility, Revision I (DOE/NV, 1997). This Corrective Measures Study (CMS) for the Area 6 DPF has been prepared for the DOE/NV`s Environmental Restoration Project. The CMS has been developed to support the preparation of a Closure Plan for the DPF. Because of the complexities of the contamination and regulatory issues associated with the DPF, DOE/NV determined a CMS would be beneficial to the evaluation and selection of a closure alternative.

NONE

1997-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

No Fear Act | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Working at NNSA Blog No Fear Act Home > About Us > Our Operations > Management and Budget > Office of Civil Rights > No Fear Act No Fear Act The NNSA Office of Civil Rights is...

202

State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan. Revision 2  

SciTech Connect

The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.

Not Available

1993-11-01T23:59:59.000Z

203

Microsoft Word - Recovery Act Cover  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspector General Inspector General Office of Audit Services Audit Report Decommissioning and Demolition Activities at Office of Science Sites OAS-RA-L-10-05 August 2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: August 12, 2010 Audit Report Number: OAS-RA-L-10-05 REPLY TO ATTN OF: IG-32 (A10RA005) SUBJECT: Audit Report on "Decommissioning and Demolition Activities at Office of Science Sites" TO: Deputy Director for Field Operations, SC-3 Manager, Brookhaven Site Office Manager, Argonne Site Office INTRODUCTION AND OBJECTIVE In February 2009, the President signed the American Recovery and Reinvestment Act of 2009 (Recovery Act) into law. The Department of Energy's (Department) Office of Environmental Management (EM) allocated $140 million of Recovery Act funds to

204

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

69.2 Million in 69.2 Million in Weatherization Funding and Energy Efficiency Grants for Maine Part of nearly $8 billion in Recovery Act funding for energy efficiency efforts nationwide that will create 100,000 jobs and cut energy bills for families March 12, 2009 Obama-Biden Administration Announces More Than $94.7 Million in Weatherization Funding and Energy Efficiency Grants for Kansas Part of nearly $8 billion in Recovery Act funding for energy efficiency efforts nationwide that will create 100,000 jobs and cut energy bills for families March 12, 2009 Obama-Biden Administration Announces More Than $121.3 Million in Weatherization Funding and Energy Efficiency Grants for Iowa Part of nearly $8 billion in Recovery Act funding for energy efficiency efforts nationwide that will create 100,000 jobs and cut energy bills for

205

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 18, 2010 June 18, 2010 Energetx Composites was able to purchase equipment such as this mold for utility-scale wind turbine blades thanks to a Recovery Act grant that matched the company's $3.5 million investment. | Photo Courtesy of Energetx | VP 100: Retooling Michigan -- Yachts and Watts Tiara Yachts makes fiber composite structures for boats. Now the Holland, Mich.-based company is transforming part of its factory and using its 30 years of expertise in composites to establish a new company - Energetx Composites - that will produce commercial-sized wind turbine blades. June 18, 2010 Five More States Reach Major Recovery Act Weatherization Milestone Minnesota, Montana, New Hampshire, New Mexico, and Utah Have Weatherized Over 9,000 Homes with Recovery Act Funding

206

National Environmental Policy Act RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Environmental Policy Act Review Module National Environmental Policy Act Review Module March 2010 CD- N -0 OFFICE O National E C CD-1 OF ENVIRO Standa Environm Rev Critical Deci CD-2 M ONMENTA ard Review mental P view Modul ision (CD) A C March 2010 AL MANAG Plan olicy Act le Applicability D-3 GEMENT t (NEPA) CD-4 ) Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

207

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 2009 12, 2009 Obama-Biden Administration Announces More Than $89.8 Million in Weatherization Funding and Energy Efficiency Grants for Mississippi Part of nearly $8 billion in Recovery Act funding for energy efficiency efforts nationwide that will create 100,000 jobs and cut energy bills for families March 12, 2009 Obama-Biden Administration Announces More Than $122.3 Million in Weatherization Funding and Energy Efficiency Grants for Louisiana Part of nearly $8 billion in Recovery Act funding for energy efficiency efforts nationwide that will create 100,000 jobs and cut energy bills for families March 12, 2009 Obama-Biden Administration Announces More Than $123.4 Million in Weatherization Funding and Energy Efficiency Grants for Kentucky Part of nearly $8 billion in Recovery Act funding for energy efficiency

208

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nearly $80.7 Million in Weatherization Nearly $80.7 Million in Weatherization Funding and Energy Efficiency Grants for Oregon Part of nearly $8 billion in Recovery Act funding for energy efficiency efforts nationwide that will create 100,000 jobs and cut energy bills for families March 12, 2009 Obama-Biden Administration Announces More Than $107.6 Million in Weatherization Funding and Energy Efficiency Grants for Oklahoma Part of nearly $8 billion in Recovery Act funding for energy efficiency efforts nationwide that will create 100,000 jobs and cut energy bills for families March 12, 2009 Obama-Biden Administration Announces More Than $362.8 Million in Weatherization Funding and Energy Efficiency Grants for Ohio Part of nearly $8 billion in Recovery Act funding for energy efficiency efforts nationwide that will create 100,000 jobs and cut energy bills for

209

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 AcuTemp received a $900,000 48C manufacturing tax credit under the American Recovery and Reinvestment Act to increase production of the company's ThermoCor vacuum insulation panels for more efficient ENERGY STAR appliances. | Photo courtesy of AcuTemp | AcuTemp Expands as Appliances Become More Energy Efficient AcuTemp, a small U.S. company that manufactures vacuum insulation panels that are needed to maintain precise temperatures for cold-storage products, is expanding and creating jobs in Dayton, OH thanks in part to the Recovery Act. August 6, 2010 A $20 million Recovery Act award will help Solazyme take production from tens of thousands of gallons a year of its algae "drop-in" oil to an annual production capacity of over half a million gallons. | Photo courtesy of Solazyme, Inc. |

210

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 12, 2010 August 12, 2010 Department of Energy Paves Way for Additional Clean Energy Projects and Jobs Through Manufacturing Solicitation Recovery Act Funds to Support New Renewable Energy Manufacturing Projects August 2, 2010 Department of Energy Announces $188 Million for Small Business Technology Commercialization Includes $73 million in Recovery Act Investments to Help Small Businesses Bring Clean Energy Ideas to the Marketplace July 22, 2010 Secretary Chu Announces Six Projects to Convert Captured CO2 Emissions from Industrial Sources into Useful Products $106 Million Recovery Act Investment will Reduce CO2 Emissions and Mitigate Climate Change July 21, 2010 DOE Hosts Workshop on Transition to Electric Vehicles Washington, DC - On Thursday, July 22, 2010, the Department of Energy will

211

Land Reclamation Act (Missouri) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reclamation Act (Missouri) Land Reclamation Act (Missouri) Eligibility Commercial Construction Industrial Institutional Investor-Owned Utility Local Government MunicipalPublic...

212

Energy Employees Occupational Illness Compensation Program Act...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Employees Occupational Illness Compensation Program Act (EEOICPA) Tracking System PIA, Office of Business Operations Energy Employees Occupational Illness Compensation Program Act...

213

Secretarial Determination Pursuant to USEC Privatization Act...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pursuant to USEC Privatization Act for the Sale or Transfer of Low-Enriched Uranium Secretarial Determination Pursuant to USEC Privatization Act for the Sale or Transfer...

214

Recovery Act Funding Opportunity Announcement: Enhanced Geothermal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here Home Recovery Act Funding Opportunity Announcement: Enhanced Geothermal Systems Component Research and DevelopmentAnalysis Recovery Act Funding Opportunity...

215

Water Quality Act (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Quality Act (Montana) Water Quality Act (Montana) Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility StateProvincial Govt Industrial...

216

Technology Transfer Commercialization Act of 2000 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Transfer Commercialization Act of 2000 Technology Transfer Commercialization Act of 2000 PUBLIC LAW 106-404-NOV. 1, 2000 To improve the ability of Federal agencies to...

217

Safety of Dams and Reservoirs Act (Nebraska)  

Energy.gov (U.S. Department of Energy (DOE))

This act regulates dams and associated reservoirs to protect health and public safety and minimize adverse consequences associated with potential dam failure. The act describes the responsibilities...

218

Federal Energy Management Program: Recovery Act  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act to Recovery Act to someone by E-mail Share Federal Energy Management Program: Recovery Act on Facebook Tweet about Federal Energy Management Program: Recovery Act on Twitter Bookmark Federal Energy Management Program: Recovery Act on Google Bookmark Federal Energy Management Program: Recovery Act on Delicious Rank Federal Energy Management Program: Recovery Act on Digg Find More places to share Federal Energy Management Program: Recovery Act on AddThis.com... Energy Savings Performance Contracts ENABLE Utility Energy Service Contracts On-Site Renewable Power Purchase Agreements Energy Incentive Programs Recovery Act Technical Assistance Projects Project Stories Recovery Act The American Recovery and Reinvestment Act of 2009 included funding for the Federal Energy Management Program (FEMP) to facilitate the Federal

219

HWMA/RCRA Closure Plan for the TRA/MTR Warm Waste System Voluntary Consent Order SITE-TANK-005 Tank System TRA-007  

Science Conference Proceedings (OSTI)

This Hazardous Waste Management Act/Resource Conservation and Recovery Act Closure Plan was developed for portions of the Test Reactor Area/Materials Test Reactor Warm Waste System located in the Materials Test Reactor Building (TRA-603) at the Reactor Technology Complex, Idaho National Laboratory Site, to meet a further milestone established under Voluntary Consent Order Action Plan SITE-TANK-005 for the Tank System TRA-007. The reactor drain tank and canal sump to be closed are included in the Test Reactor Area/Materials Test Reactor Warm Waste System. The reactor drain tank and the canal sump will be closed in accordance with the interim status requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and Code of Federal Regulations 265. This closure plan presents the closure performance standards and methods for achieving those standards.

K. Winterholler

2007-01-30T23:59:59.000Z

220

HWMA/RCRA Closure Plan for the CPP-648 Radioactive Solid and Liquid Waste Storage Tank System (VES-SFE-106)  

Science Conference Proceedings (OSTI)

This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Radioactive Solid and Liquid Waste Storage Tank System located in the adjacent to the Sludge Tank Control House (CPP-648), Idaho Nuclear Technology and Engineering Center, Idaho National Laboratory, was developed to meet the interim status closure requirements for a tank system. The system to be closed includes a tank and associated ancillary equipment that were determined to have managed hazardous waste. The CPP-648 Radioactive Solid and Liquid Waste Storage Tank System will be "cleaned closed" in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act as implemented by the Idaho Administrative Procedures Act and 40 Code of Federal Regulations 265. This closure plan presents the closure performance standards and methods of acheiving those standards for the CPP-648 Radioactive Solid and Liquid Waste Storage Tank System.

S. K. Evans

2006-08-15T23:59:59.000Z

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Recovery Act Measurement Science and Engineering ...  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. Recovery Act Measurement Science and Engineering Fellowship Program. Grants.gov Synopsis. ...

2013-03-15T23:59:59.000Z

222

Federal Information Security Management Act (FISMA) ...  

Science Conference Proceedings (OSTI)

Federal Information Security Management Act (FISMA) Implementation Project. Summary: The FISMA Implementation Project ...

2013-01-15T23:59:59.000Z

223

SEPA Freedom of Information Act (FOIA) program  

Energy.gov (U.S. Department of Energy (DOE))

Southeastern Participates in the United States Governments Freedom of Information Act (FOIA) program.

224

Weatherization and Intergovernmental Program: Recovery Act  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act to someone by E-mail Share Weatherization and Intergovernmental Program: Recovery Act on Facebook Tweet about Weatherization and Intergovernmental Program: Recovery Act on Twitter Bookmark Weatherization and Intergovernmental Program: Recovery Act on Google Bookmark Weatherization and Intergovernmental Program: Recovery Act on Delicious Rank Weatherization and Intergovernmental Program: Recovery Act on Digg Find More places to share Weatherization and Intergovernmental Program: Recovery Act on AddThis.com... Plans, Implementation, & Results Weatherization Assistance Program WAP - Sustainable Energy Resources for Consumers Grants WAP - Weatherization Innovation Pilot Program State Energy Program Energy Efficiency & Conservation Block Grant Program

225

EMSL: Capabilities: American Recovery and Reinvestment Act  

NLE Websites -- All DOE Office Websites (Extended Search)

American Recovery and Reinvestment Act American Recovery and Reinvestment Act Recovery Act Logo EMSL researchers are benefitting from a recent $60 million investment in innovation through the American Recovery and Reinvestment Act. These Recovery Act funds were employed to further develop and deploy transformational capabilities that deliver scientific discoveries in support of DOE's mission. Today, they are helping EMSL accomplish the following: Establish leadership in in situ chemical imaging and procure ultrahigh-resolution microscopy tools Additional Information Investing in Innovation: EMSL and the American Recovery and Reinvestment Act Recovery Act and Systems Biology at EMSL Recovery Act Instruments coming to EMSL In the News EMSL ARRA Capability Features News: Recovery Act and PNNL Recovery Act in the Tri-City Herald

226

Vehicle Technologies Office: Recovery Act Funding Opportunities  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act Funding Recovery Act Funding Opportunities to someone by E-mail Share Vehicle Technologies Office: Recovery Act Funding Opportunities on Facebook Tweet about Vehicle Technologies Office: Recovery Act Funding Opportunities on Twitter Bookmark Vehicle Technologies Office: Recovery Act Funding Opportunities on Google Bookmark Vehicle Technologies Office: Recovery Act Funding Opportunities on Delicious Rank Vehicle Technologies Office: Recovery Act Funding Opportunities on Digg Find More places to share Vehicle Technologies Office: Recovery Act Funding Opportunities on AddThis.com... Recovery Act Funding Opportunities President Barack Obama announced on March 19 that the DOE is offering up to $2.4 billion in American Recovery and Reinvestment Act funds to support next-generation plug-in hybrid electric vehicles (PHEV) and their advanced

227

EMSL: Capabilities: American Recovery and Reinvestment Act  

NLE Websites -- All DOE Office Websites (Extended Search)

EMSL Procurements under Recovery Act EMSL Procurements under Recovery Act Additional Information Investing in Innovation: EMSL and the American Recovery and Reinvestment Act Recovery Act and Systems Biology at EMSL Recovery Act Instruments coming to EMSL In the News EMSL ARRA Capability Features News: Recovery Act and PNNL Recovery Act in the Tri-City Herald Related Links Recovery.gov DOE and the Recovery Act Message from Energy Secretary Chu Recovery Act at PNNL EMSL evolves with the needs of its scientific users, and the American Recovery and Reinvestment Act has helped to accelerate this evolution. Thirty-one instruments were acquired and installed at EMSL. These instruments are listed below, and each listing is accompanied by a brief overview. Each of these new and leading-edge instruments was chosen by design to

228

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 22, 2011 June 22, 2011 Recovery Act SGDP View a map which combines the above two maps View the full list of selected projects June 22, 2011 Recovery Act: Smart Grid Interoperability Standards and Framework May 18, 2009 Locke, Chu Announce Significant Steps in Smart Grid Development WASHINGTON - U.S. Commerce Secretary Gary Locke and U.S. Energy Secretary Steven Chu today announced significant progress that will help expedite development of a nationwide "smart" electric power grid. June 22, 2011 Strategic Plan A modern, reliable, secure, affordable and environmentally sensitive national energy infrastructure is fundamental to our quality of life and energy future. Yet since 1982, growth in peak demand for electricity has exceeded the growth and development of our electric grid. This demand

229

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 12, 2011 April 12, 2011 Department of Energy Offers Conditional Commitment for $1.187 Billion Loan Guarantee to Support California Solar Generation Project Recovery Act-Supported Project Estimated to Create Over 350 Jobs and Avoid over 430,000 Tons of Carbon Dioxide Annually March 3, 2011 Department of Energy Offers Conditional Commitment for a Loan Guarantee to Support Maine Wind Project Recovery Act-Funded Project Expected to Create Approximately 200 Jobs and Avoid over 70,000 Tons of Carbon Pollution Annually February 17, 2011 Department of Energy Offers Support for an Oregon Solar Manufacturing Project Project Estimated to Create Over 700 Jobs and Greater Efficiencies in the Production of Photovoltaic Panels February 15, 2011 Department of Energy Finalizes Loan Guarantee for New Transmission Project

230

Supernova Caught in the Act  

NLE Websites -- All DOE Office Websites (Extended Search)

Supernova Caught in Supernova Caught in the Act Supernova Caught in the Act Earliest-ever Detection Made Possible by Computing, Networks August 25, 2011 Contact: Linda Vu, +1 510 495 2402, lvu@lbl.gov ptf11kly.jpg Before and after images of supernova PTF 11kly as it appeared in the nearby M101 galaxy. Click to enlarge. (Images: Peter Nugent) A supernova discovered yesterday is closer to Earth-approximately 21 million light-years away-than any other of its kind in a generation. Astronomers believe they caught the supernova within hours of its explosion, a rare feat made possible by a specialized survey telescope and state-of-the-art computational tools. The discovery of such a supernova so early and so close has energized the astronomical community as they are scrambling to observe it with as many

231

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 24, 2013 September 24, 2013 Carbon fiber material produced at SGL Automotive Carbon Fibers in Moses Lake, Wash. (Photo courtesy of SGL Automotive Carbon Fibers) Electric Car Featuring High-Tech Material Made in the USA Makes Its Debut One of the world's first electric vehicles built using ultra lightweight carbon fiber material manufactured in the U.S. was recently unveiled. September 20, 2013 Electrical transmission lines cross a snow-covered field in Dallas Dam, Oregon. | Energy Department photo. Top 9 Things You Didn't Know About America's Power Grid Ever wonder how electricity gets to your home? Test your knowledge with these top power grid facts. September 16, 2013 Cumulative Federal Payments to OE Recovery Act Recipients, through August 31, 2013 Graph of cumulative Federal Payments to OE Recovery Act Recipients, through

232

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19, 2010 19, 2010 North Community Police Substation upgraded its solar energy system with the help of Recovery Act funds. The city's electric bill will be about $5,000 cheaper. | Courtesy of the City of Henderson Police Station Triples Solar Power - and Savings The Henderson, Nevada, police department is going above and beyond the call of duty by tripling the size of its solar panel system on its LEED-certified station, saving the city thousands of dollars in energy costs. July 15, 2010 VP 100: President Obama Hails Electric-Vehicle Battery Plant President Obama visits Compact Power in Holland, Michigan -- one of nine new battery plants under construction as a result of the $2.4 billion in Recovery Act advanced battery and electric vehicle awards the President announced last August.

233

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 25, 2010 February 25, 2010 Bluegrass State Getting Greener To help reduce Kentucky's energy appetite, the state set a goal of 25-percent energy reduction by 2025 and is using Recovery Act funding from the U.S. Department of Energy to improve the energy-efficiency of its buildings. February 19, 2010 Homes Weatherized by State for Calendar Year 2009 February 19, 2010 Secretary Chu's Remarks on the Anniversary of the Recovery Act February 19, 2010 January 26, 2010 Electric Cars Coming to Former Delaware GM Plant If a company's cars are luxurious enough for the Crown Prince of Denmark, then just imagine how the vehicles - which have a 50-mile, emission-free range on a single electric charge - might be received by folks in the U.S. January 15, 2010 Secretary Chu Announces More than $37 Million for Next Generation Lighting

234

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 22, 2010 April 22, 2010 Weatherization Subgrantees Reach More N.Y. Homes Why weatherization is booming in the South Bronx. April 21, 2010 Vice President Biden Kicks Off Five Days of Earth Day Activities with Announcement of Major New Energy Efficiency Effort 25 Communities Selected for Recovery Act "Retrofit Ramp-Up" Awards April 15, 2010 Arkansas Preparing for Wind Power Arkansas energy leaders are working to get the best data for potential wind energy decisions. April 1, 2010 Wisconsin LED Plant Benefits from Recovery Act "It's a win for everyone: the environment, the cities, buildings, for us," says Gianna O'Keefe, marketing manager for Ruud Lighting, which is producing LED lights that emit more light, have a longer life and provide anywhere from 50 to 70 percent in energy savings.

235

Clean Air Act, Section 309  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CLEAN AIR ACT § 309* CLEAN AIR ACT § 309* §7609. Policy review (a) The Administrator shall review and comment in writing on the environmental impact of any matter relating to duties and responsibilities granted pursuant to this chapter or other provisions of the authority of Administrator, contained in any (1) legislation proposed by any Federal department or agency, (2) newly authorized Federal projects for construction and any major Federal agency action (other than a project for construction) to which section 4332(2)(C) of this title applies, and (3) proposed regulations published by any department or agency of the Federal Government. Such written comment shall be made public at the conclusion of any such review. (b) In the event the Administrator determines that any such legislation, action, or regulation

236

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

46.3 Million in 46.3 Million in Weatherization Funding and Energy Efficiency Grants for Alaska Part of nearly $8 billion in Recovery Act funding for energy efficiency efforts nationwide that will create 100,000 jobs and cut energy bills for families March 12, 2009 Obama-Biden Administration Announces More Than $127.3 Million in Weatherization Funding and Energy Efficiency Grants for Alabama Part of nearly $8 billion in Recovery Act funding for energy efficiency efforts nationwide that will create 100,000 jobs and cut energy bills for families March 11, 2009 Statement of Steven Chu Secretary of Energy Before the Committee on the Budget March 11, 2009 March 5, 2009 Secretary Steven Chu Editorial in USA Today Washington, D.C. - This morning's edition of USA Today includes the following editorial from Energy Secretary Steven Chu highlighting President

237

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

185.5 Million in 185.5 Million in Weatherization Funding and Energy Efficiency Grants for Missouri Part of nearly $8 billion in Recovery Act funding for energy efficiency efforts nationwide that will create 100,000 jobs and cut energy bills for families March 12, 2009 Obama-Biden Administration Announces More Than $35.1 Million in Weatherization Funding and Energy Efficiency Grants for Wyoming Washington, DC -- Vice President Joe Biden and Energy Secretary Chu today announced Wyoming will receive $35,180,261 in weatherization and energy efficiency funding - including $10,239,261 for the Weatherization Assistance Program and $24,941,000 for the State Energy Program. This is part of a nationwide investment announced today of nearly $8 billion under the President's American Recovery and Reinvestment Act - an investment that

238

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2, 2009 December 2, 2009 Alabama Family Staying Nice and Cozy This Fall Recovery Act money to weatherize homes has resulted in much lower energy bills for Alabama families, including Mary, whose bill is about $300 cheaper now. December 2, 2009 Training Center Gets People Work, Teaches New Skills Corporation for Ohio Appalachian Development, a nonprofit organization comprised of 17 community action agencies involved in weatherization, has been awarded Recovery Act funds to help train weatherization providers and create jobs across Ohio. December 2, 2009 Former Auto Worker Gauges Efficiency of American Homes Holland, Michigan resident retools skills learned testing car parts to land new job assessing home energy efficiency as a weatherization inspector. October 15, 2009

239

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 11, 2013 July 11, 2013 Analysis of Customer Enrollment Patterns in TIme-Based Rate Programs: Initial Results from the SGIG Consumer Behavior Studies (July 2013) The Smart Grid Investment Grant program's consumer behavior study effort presents an opportunity to advance the electric power industry's understanding of consumer behaviors in terms of customer acceptance and retention, and energy and peak demand impacts. July 10, 2013 Cumulative Federal Payments to OE Recovery Act Recipients, through June 30, 2013 Graph of cumulative Federal Payments to OE Recovery Act Recipients, through June 30, 2013. July 7, 2013 Voices of Experience: Insights on Smart Grid Customer Engagement (July 2013) The success of the Smart Grid will depend in part on consumers taking a more proactive role in managing their energy use. This document is the

240

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 7, 2011 February 7, 2011 Mechanics train with plasma arc cutting equipment at the Paducah Site | Courtesy of Paducah Gaseous Diffusion Plant 240 Jobs Later: The Recovery Act's Impact at the Paducah Site Workers at the Department of Energy's Paducah Site are doing great things with the training they've received as part of the Recovery Act. January 25, 2011 Watercolor print of the Aldo Leopold Nature Center (ALNC) with new facilities. How a Wisconsin Nature Center is Leading by Example With funding from the U.S. Department of Energy, this Wisconsin nature center will be at the forefront in demonstrating the latest energy efficiency and renewable energy technologies to thousands of visitors every year. January 24, 2011 Vids 4 Grids: Surge Arresters and Switchgears A new video series is increasing general public knowledge of the cutting

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 17, 2010 March 17, 2010 Solar panels at Terry Sandstrom's home in Wheatland, Wyo. | Photo courtesy of Terry Sandstrom Solar and Wind Powering Wyoming Home Terry Sandstrom never thought he would run his house entirely on renewable energy, but when faced with a $100,000 price tag to get connected to the grid, he had to look at alternative options. March 17, 2010 DOE Releases New Report on Benefits of Recovery Act for Small Businesses in Clean Energy, Environmental Management Sectors WASHINGTON - The Department of Energy today released a new report highlighting the benefits of the Recovery Act to small businesses throughout the clean, renewable energy industry and environmental management sector. The report found that as of early March 2010, small businesses have been selected to receive nearly $5.4 billion in funding

242

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 14, 2009 September 14, 2009 Obama Administration Delivers More than $60 Million for Weatherization Programs in Six States and Territories Recovery Act funding to expand weatherization assistance programs, create jobs and weatherize nearly 17,000 homes in American Samoa, Northern Arapahoe Tribe, Northern Mariana Islands, Puerto Rico, Tennessee and the U.S. Virgin Islands September 14, 2009 DOE Delivers More than $354 Million for Energy Efficiency and Conservation Projects in 22 States Washington, DC - Energy Secretary Steven Chu announced today that more than $354 million in funding from the American Recovery and Reinvestment Act is being awarded to 22 states to support energy efficiency and conservation activities. Under the Department of Energy's Efficiency and Conservation

243

Public comment re Price-Anderson Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Price Anderson Act Concerning The Continuation Or Modification Of The Act Public comment re Price-Anderson Act More Documents & Publications PUBLIC COMMENT re Price-Anderson Act...

244

Solid Waste Disposal, Hazardous Waste Management Act, Underground...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Disposal, Hazardous Waste Management Act, Underground Storage Act (Tennessee) Solid Waste Disposal, Hazardous Waste Management Act, Underground Storage Act (Tennessee) Eligibility...

245

Recovery Act: Smart Grid Interoperability Standards and Framework...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Act: Smart Grid Interoperability Standards and Framework Recovery Act: Smart Grid Interoperability Standards and Framework Congressional Testimony Recovery Act Recovery Act...

246

Clean Air Act. Revision 5  

SciTech Connect

This Reference Book contains a current copy of the Clean Air Act, as amended, and those regulations that implement the statute and appear to be most relevant to DOE activities. The document is provided to DOE and contractor staff for informational purposes only and should not be interpreted as legal guidance. This Reference Book has been completely revised and is current through February 15, 1994.

Not Available

1994-02-15T23:59:59.000Z

247

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 25, 2013 April 25, 2013 Economic Impact of Recovery Act Investments in the Smart Grid Report Now Available A report on the Economic Impact of Recovery Act Investments in the Smart Grid is now available. This study analyzes the economy-wide impacts of the Recovery Act funding for smart grid project deployment in the United States, administered by Office of Electricity Delivery and Energy Reliability. Key findings include: April 25, 2013 Smart Grid: Powering Our Way to a Greener Future Learning how to be smarter and more efficient about reducing our energy consumption is on the minds of everyone this week. The smart grid, with its improved efficiency and performance, is helping consumers conserve energy and save money every day. April 9, 2013 The Notrees Wind Storage Demonstration Project is a 36-megawatt energy storage and power management system, which completed testing and became fully operational in December. It shows how energy storage can moderate the intermittent nature of wind by storing excess energy when the wind is blowing and making it available later to the electric grid to meet customer demand.

248

FOIA Reading Room - privacy act  

NLE Websites -- All DOE Office Websites (Extended Search)

Reading Room - pricacy act Reading Room - pricacy act CH Frequently Requested Documents Under FOIA Administrative Electronic FOIA Form Privacy Act Advisory (Microsoft Word(tm) document) DOE-CH Government Purchase Card Cardholders: December 2012 CH Organizational Chart: Current Version Policies and Procedures - Office of Science (including Chicago Office) Office of Hearings and Appeals Decisions Department of Justice Cases and Legal Documents Department of Energy Directives DOE Office of Inspector General Reports Responses Under FOIA FY10 Management and Operating Contracts "FY2012 Laboratory Performance Report Cards" The following management and operating prime contracts under the jurisdiction of DOE-CH have been renewed and posted for your convenience. Modifications that change, delete, or add language to any portion of these contracts (referred to as "M" Mods) will be posted as expeditiously as possible after execution. It is at the discretion of the Contractors whether or not they include modifications that change the amount obligated by the Government. Ames Laboratory - Contract No. No.DE-AC02-07CH11358

249

Manifest requirements. RCRA Information Brief  

Science Conference Proceedings (OSTI)

Specific pretransport regulatory requirements must be met by DOE prior to shipment of hazardous waste, low-level wastes (LLW), and radioactive mixed wastes (RMW). The pretransport requirements are intended to help reduce the risk of loss or leakage of, or exposure to, hazardous wastes, LLW, and RMW during shipment; and to communicate information on potential hazards to shippers, carriers, or receivers of waste shipments, and emergency response personnel in the event of an accident, spill, or leak. These goals are accomplished through tracking of shipments, correct packaging and labeling, and communication of potential hazards. Specific requirements include manifesting, packaging, marking and labeling of waste packages, placarding of vehicles, and selecting appropriate waste transporters and shipment destinations. This Information Brief focuses on the manifesting requirements associated with domestic transport of hazardous wastes, LLW, and RMW.

Not Available

1994-04-01T23:59:59.000Z

250

ARKANSAS RECOVERY ACT SNAPSHOT | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ARKANSAS RECOVERY ACT SNAPSHOT ARKANSAS RECOVERY ACT SNAPSHOT ARKANSAS RECOVERY ACT SNAPSHOT Arkansas has substantial natural resources, including gas, oil, wind, biomass, and hydroelectric power. The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Arkansas are supporting a broad range of clean energy projects, from energy efficiency and the smart grid to advanced battery manufacturing and renewable energy. Through these investments, Arkansas's businesses, non-profits, and local governments are creating quality jobs today and positioning Arkansas to play an important role in the new energy economy of the future. ARKANSAS RECOVERY ACT SNAPSHOT More Documents & Publications

251

ALASKA RECOVERY ACT SNAPSHOT | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ALASKA RECOVERY ACT SNAPSHOT ALASKA RECOVERY ACT SNAPSHOT ALASKA RECOVERY ACT SNAPSHOT Alaska has substantial natural resources, including oil, gas, coal, solar, wind, geothermal, and hydroelectric power .The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Alaska are supporting a broad range of clean energy projects, from energy efficiency and electric grid improvements to geothermal power. Through these investments, Alaska's businesses, universities, non-profits, and local governments are creating quality jobs today and positioning Alaska to play an important role in the new energy economy of the future. ALASKA RECOVERY ACT SNAPSHOT More Documents & Publications

252

GEORGIA RECOVERY ACT SNAPSHOT | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GEORGIA RECOVERY ACT SNAPSHOT GEORGIA RECOVERY ACT SNAPSHOT GEORGIA RECOVERY ACT SNAPSHOT Georgia has substantial natural resources, including biomass and hydroelectric power .The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Georgia are supporting a broad range of clean energy projects, from energy efficiency and the smart grid to environmental cleanup and alternative fuels and vehicles. Through these investments, Georgia's businesses, universities, non-profits, and local governments are creating quality jobs today and positioning Georgia to play an important role in the new energy economy of the future. GEORGIA RECOVERY ACT SNAPSHOT More Documents & Publications

253

ARIZONA RECOVERY ACT SNAPSHOT | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ARIZONA RECOVERY ACT SNAPSHOT ARIZONA RECOVERY ACT SNAPSHOT ARIZONA RECOVERY ACT SNAPSHOT Arizona has substantial natural resources, including coal, solar, and hydroelectric resources. The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Arizona reflect a broad range of clean energy projects, from energy efficiency and the smart grid to transportation, carbon capture and storage, and geothermal energy. Through these investments, Arizona's businesses, universities, non-profits, and local governments are creating quality jobs today and positioning Arizona to play an important role in the new energy economy of the future. ARIZONA RECOVERY ACT SNAPSHOT More Documents & Publications

254

ARKANSAS RECOVERY ACT SNAPSHOT | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ARKANSAS RECOVERY ACT SNAPSHOT ARKANSAS RECOVERY ACT SNAPSHOT ARKANSAS RECOVERY ACT SNAPSHOT Arkansas has substantial natural resources, including gas, oil, wind, biomass, and hydroelectric power. The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Arkansas are supporting a broad range of clean energy projects, from energy efficiency and the smart grid to advanced battery manufacturing and renewable energy. Through these investments, Arkansas's businesses, non-profits, and local governments are creating quality jobs today and positioning Arkansas to play an important role in the new energy economy of the future. ARKANSAS RECOVERY ACT SNAPSHOT More Documents & Publications

255

GEORGIA RECOVERY ACT SNAPSHOT | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GEORGIA RECOVERY ACT SNAPSHOT GEORGIA RECOVERY ACT SNAPSHOT GEORGIA RECOVERY ACT SNAPSHOT Georgia has substantial natural resources, including biomass and hydroelectric power .The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Georgia are supporting a broad range of clean energy projects, from energy efficiency and the smart grid to environmental cleanup and alternative fuels and vehicles. Through these investments, Georgia's businesses, universities, non-profits, and local governments are creating quality jobs today and positioning Georgia to play an important role in the new energy economy of the future. GEORGIA RECOVERY ACT SNAPSHOT More Documents & Publications

256

The East Tennessee Technology Park Progress Report for the Tennessee Hazardous Waste Reduction Act for Calendar Year 1999  

Science Conference Proceedings (OSTI)

This report is prepared for the East Tennessee Technology Park (formerly the Oak Ridge K-25 Site) (ETTP) in compliance with the ''Tennessee Hazardous Waste Reduction Act of 1990'' (THWRA) (TDEC 1990), Tennessee Code Annotated 68-212-306. Annually, THWRA requires a review of the site waste reduction plan, completion of summary waste reduction information as part of the site's annual hazardous waste reporting, and completion of an annual progress report analyzing and quantifying progress toward THWRA-required waste stream-specific reduction goals. This THWRA-required progress report provides information about ETTP's hazardous waste streams regulated under THWRA and waste reduction progress made in calendar year (CY) 1999. This progress report also documents the annual review of the site plan, ''Oak Ridge Operations Environmental Management and Enrichment Facilities (EMEF) Pollution Prevention Program Plan'', BJC/OR-306/R1 (Bechtel Jacobs Company 199a). In 1996, ETTP established new goal year ratios that extended the goal year to CY 1999 and targeted 50 percent waste stream-specific reduction goals. In CY 1999, these CY 1999 goals were extended to CY 2000 for all waste streams that generated waste in 1999. Of the 70 ETTP RCRA waste streams tracked in this report from base years as early as CY 1991, 51 waste streams met or exceeded their reduction goal based on the CY 1999 data.

Bechtel Jacobs Company LLC

2000-03-01T23:59:59.000Z

257

The East Tennessee Technology Park Progress Report for the Tennessee Hazardous Waste Reduction Act for Calendar Year 2000  

Science Conference Proceedings (OSTI)

This report is prepared for the East Tennessee Technology Park (formerly the Oak Ridge K-25 Site) (ETTP) in compliance with the ''Tennessee Hazardous Waste Reduction Act of 1990'' (THWRA) (TDEC 1990), Tennessee Code Annotated 68-212-306. Annually, THWRA requires a review of the site waste reduction plan, completion of summary waste reduction information as part of the site's annual hazardous waste reporting, and completion of an annual progress report analyzing and quantifying progress toward THWRA-required waste stream-specific reduction goals. This THWRA-required progress report provides information about ETTP's hazardous waste streams regulated under THWRA and waste reduction progress made in calendar year (CY) 2000. This progress report also documents the annual review of the site plan, ''Oak Ridge Operations Environmental Management and Enrichment Facilities (EMEF) Pollution Prevention Program Plan'', BJC/OR-306/R1 (Bechtel Jacobs Company 2000). In 1996, ETTP established new goal year ratios that extended the goal year to CY 1999 and targeted 50 percent waste stream-specific reduction goals. In CY 2000, these goals were extended to CY 2001 for all waste streams that generated waste in 2000. Of the 70 ETTP RCRA waste streams tracked in this report from base years as early as CY 1991, 50 waste streams met or exceeded their reduction goal based on the CY 2000 data.

Bechtel Jacobs Company LLC

2001-03-01T23:59:59.000Z

258

Resource Conservation and Recovery Act permit modifications and the functional equivalency demonstration: a case study  

Science Conference Proceedings (OSTI)

Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements that specific components and equipment be used. Consequently, changing these items, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are ``functionally equivalent.`` The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements. The incinerator`s carbon adsorption unit/high efficiency particulate air filtration system, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. In performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent. In this case, the key performance data included gas residence time and distribution of flow over the activated carbon. Because both units were custom designed and fabricated, a simple comparison of manufacturers` specifications was impossible. Therefore, numerical simulation of each unit design was performed using the TEMPEST thermal-hydraulic computer code to model isothermal hydrodynamic performance under steady-state conditions. The results of residence time calculations from the model were coupled with flow proportion and sampled using a Monte Carlo-style simulation to derive distributions that describe the predicted residence times.

Elsberry, K.; Garcia, P. [Los Alamos National Lab., NM (United States); Carnes, R.; Kinker, J.; Loehr, C; Lyon, W. [Benchmark Environmental Corp., Albuquerque, NM (United States)

1996-02-01T23:59:59.000Z

259

HWMA/RCRA CLOSURE PLAN FOR THE MATERIALS TEST REACTOR WING (TRA-604) LABORATORY COMPONENTS VOLUNTARY CONSENT ORDER ACTION PLAN VCO-5.8 D REVISION2  

SciTech Connect

This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan was developed for the laboratory components of the Test Reactor Area Catch Tank System (TRA-630) that are located in the Materials Test Reactor Wing (TRA-604) at the Reactor Technology Complex, Idaho National Laboratory Site, to meet a further milestone established under Voluntary Consent Order Action Plan VCO-5.8.d. The TRA-604 laboratory components addressed in this closure plan were deferred from the TRA-630 Catch Tank System closure plan due to ongoing laboratory operations in the areas requiring closure actions. The TRA-604 laboratory components include the TRA-604 laboratory warm wastewater drain piping, undersink drains, subheaders, and the east TRA-604 laboratory drain header. Potentially contaminated surfaces located beneath the TRA-604 laboratory warm wastewater drain piping and beneath the island sinks located in Laboratories 126 and 128 (located in TRA-661) are also addressed in this closure plan. The TRA-604 laboratory components will be closed in accordance with the interim status requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, Subparts G and J. This closure plan presents the closure performance standards and the methods for achieving those standards.

KIRK WINTERHOLLER

2008-02-25T23:59:59.000Z

260

HWMA/RCRA Closure Plan for the Basin Facility Basin Water Treatment System - Voluntary Consent Order NEW-CPP-016 Action Plan  

SciTech Connect

This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve "clean closure" of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems.

Evans, S. K.

2007-11-07T23:59:59.000Z

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

qryFairAct2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fair Act Inventory Data Fair Act Inventory Data OrgUnit State Location FTE Function Reason YrFirst Appeared RespName RespTitle RespPhone YrCostConv FTESav EstAnnCostSav PostMEODate The Secretary of Energy Advisory Board DC Forrestal 1.0 Y000 A 1999 Roscoe+Harris Management+Analyst 0 0 The Secretary of Energy Advisory Board DC Forrestal 1.0 Y000 B 1999 Roscoe+Harris Management+Analyst 0 0 The Secretary of Energy Advisory Board DC Forrestal 1.0 Y000 A 1999 Roscoe+Harris Management+Analyst 202-586-5527 Albuquerque Field Office NM Albuquerque 1.0 Y815 A 1999 John Jackson 505-845-5474 0 0 Albuquerque Field Office NM ALBUQUERQUE 1.0 U800 A 1999 John Jackson 505-845-5474 Albuquerque Field Office NM ALBUQUERQUE 1.0 U800 A 1999 John Jackson 505-845-5474 Albuquerque Field Office NM ALBUQUERQUE 3.0 U800 A 1999 John Jackson 505-845-5474 Albuquerque Field Office

262

Recovery Act Reports | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act » Recovery Act Reports Recovery Act » Recovery Act Reports Recovery Act Reports The following is a list of the oversight results by the Office of Inspector General regarding The Department's programs, grants, and projects funded under the Recovery Act. November 25, 2013 Audit Report: OAS-RA-14-02 The Department of Energy's American Recovery and Reinvestment Act Energy Efficiency and Conservation Block Grant Program - District of Columbia September 27, 2013 Audit Report: OAS-RA-13-31 The Department of Energy's Hydrogen and Fuel Cells Program September 19, 2013 Examination Report: OAS-RA-13-30 Alamo Area Council of Governments - Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment Act of 2009 September 9, 2013 Audit Report: IG-0893 Follow-up Audit of the Department of Energy's Financial Assistance for

263

No FEAR Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Protecting Civil Rights » No FEAR Act Services » Protecting Civil Rights » No FEAR Act No FEAR Act The Office of Civil Rights is committed to upholding anti-discrimination and civil rights laws. This is the Department of Energy's reporting page for the Notification and Federal Employee Anti-discrimination and Retaliation Act of 2002 (No FEAR Act), Public Law 207-174. Signed by President George W. Bush on May 15, 2002, the Act increases accountability of Federal Departments and agencies for acts of discrimination or reprisal against employees resulting from whistleblower complaints, and complaints before the Merit Systems Protection Board and the Equal Employment Opportunity Commission. The No FEAR Act requires each Federal agency to post on its public website summary statistical data relating to equal employment opportunity

264

A Primer for the Act-1 Language  

E-Print Network (OSTI)

This document is intended to describe the current design for computer programming language, Act-1. It describes the Actor computational model, which Act-1 was designed to support. A perspective is provided from which to ...

Theriault, Daniel G.

265

NH Acid Rain Control Act (New Hampshire)  

Energy.gov (U.S. Department of Energy (DOE))

The Act is implemented under New Hampshire's acid deposition control program established under the Rules to Control Air Pollution in Chapter Env-A 400. The goal of the Act is to reduce emissions...

266

Act One: Order (2013-CE-49001)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Act One Communications, Inc. to pay a $8,000 civil penalty after finding Act One had failed to certify that certain basic models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

267

Implementing the American Recovery and Reinvestment Act  

$20 million for geologic carbon sequestration training and research . Recovery Act Tax Provisions on Clean Energy Production Tax Credit

268

Enenrgy Employees Occupational Illness Compensation Program Act...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Enenrgy Employees Occupational Illness Compensation Program Act (EEOICPA) Tracking System, PIA, Savannah River Operations Office Enenrgy Employees Occupational Illness Compensation...

269

Energy Employees' Occupational Illness Compensation Program Act...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Employees' Occupational Illness Compensation Program Act (EEOICPA) Tracking Database, INL Energy Employees' Occupational Illness Compensation Program Energy Employees' Occupational...

270

Recovery Act NIST Construction Grant Program  

Science Conference Proceedings (OSTI)

Recovery Act NIST Construction Grant Program. ... Fraud Prevention Training for Recipients; Fraud Indicators Pamphlet; Red Flags of Collusion ...

2011-08-17T23:59:59.000Z

271

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 14, 2010 May 14, 2010 Club's Chairman Leading by Example Why the Sierra Club Oregon Chairman is helping his organization live up to its legacy. May 14, 2010 Cincinnati Non-profits Getting Help Saving Energy How one church is saving money and saving energy. May 14, 2010 Charlevoix, MI is using Recovery Act funds for energy upgrades | Photo courtesy Charlevoix, Michigan, City Manager | Michigan Town Committed to Sustainable Future Charlevoix, Mich. residents are taking steps to become a more environmentally-conscious community, and a $50,000 Energy Efficiency and Conservation Block Grant will help that cause. The funding will be used to launch projects aimed at energy efficiency and sustainability, such as retrofitting the city's fire and emergency vehicles with new,

272

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19, 2010 19, 2010 The Blaine County Public Safety Facility houses between 60 and 80 prisoners and roughly 30 staffers. | Photo courtesy of Blaine High Water Heating Bills on Lockdown at Idaho Jail Using funds from the American Recovery and Reinvestment Act, the county is installing a solar thermal hot water system that will provide nearly 70 percent of the power required for heating 600,000 gallons of water for the jail annually. August 16, 2010 800,000 Jobs by 2012 President Barack Obama visited ZBB Energy Corporation in Wisconsin and declared that our commitment to clean energy is expected to lead to more than 800,000 jobs by 2012. August 16, 2010 An array of solar collectors | Photo courtesy of Trane Knox County Detention Facility Goes Solar for Heating Water Hot water demand soars at the six-building Knox County Detention Facility

273

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 15, 2010 March 15, 2010 A woodchip-fired combined heat and power system will be built in Montpelier, Vt. | File photo Jobs, sustainable heating coming to Vermont city Their new woodchip-fired combined heat and power system will heat the Capitol Complex, the city's schools, City Hall and as many as 156 other buildings in the downtown area. March 12, 2010 Reginald Speight, CEO of Martin County Community Action | Photo courtesy of Martin County Community Action N.C. Agency Growing, Helping Citizens Save Money MCCA runs a hybrid program in the state that has expanded energy efficiency services to municipalities and made advanced-income households eligible for weatherization, and this work helped prepare the agency for the workload it is seeing now under the Recovery Act.

274

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21, 2011 21, 2011 Smart grid technology installations provided not only new work, but new customers for Narrows Electric owner Gary Miklethun, far l., and his team, from l. to r., Ken Dehart, Rodney Thomas and Dave Brosie. Smart Grid Technology Gives Small Business New Light Gary Miklethun, the owner of Narrows Electric, a small electrical contractor in Gig Harbor, Wash., that specializes in residential and small commercial projects, definitely felt it when the economy slowed down. But installing new smart grid technology in 500 homes not only gave his team new work, but new customers. September 21, 2011 Communications and Guidance Issued Guidance: Throughout the life of the Recovery Act, it has at times been necessary to issue guidance around certain policies or procedures.

275

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 24, 2010 September 24, 2010 MONDAY: Secretary Chu Travels to New Jersey and Philadelphia WASHINGTON - On Monday, September 27, 2010, U.S. Energy Secretary Steven Chu and Representative Rush Holt will tour Applied Photovoltaics. With help from a Recovery Act-funded $1.1 million clean energy manufacturing tax credit, Applied Photovoltaics will manufacture solar energy modules for use in building-integrated photovoltaics. September 22, 2010 Assistant Secretary Cathy Zoi and Senior Advisor Matt Rogers to Participate in Platts Energy Reporter Roundtable WASHINGTON -Thursday, September 23, 2010, Cathy Zoi, Assistant Secretary of Energy Efficiency and Renewable Energy and Matt Rogers, Senior Advisor to the Secretary of Energy, will participate in a roundtable discussion with

276

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 17, 2009 November 17, 2009 Obama Administration Announces Nearly $40 Million for Energy Efficiency and Conservation Projects in Florida and Maine Washington, DC - Energy Secretary Steven Chu announced today that DOE is awarding nearly $40 million in funding from the American Recovery and Reinvestment Act to Florida and Maine to support clean energy projects. Under DOE's Energy Efficiency and Conservation Block Grant (EECBG) program, these states will implement programs that lower energy use, reduce carbon pollution, and create green jobs locally. November 16, 2009 Oak Ridge 'Jaguar' Supercomputer is World's Fastest Six-core upgrade has 70 percent more computational muscle than last year's quad-core November 10, 2009 DOE Announces New Executive Director of Loan Guarantee Program

277

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 15, 2012 May 15, 2012 Workers install the final LED streetlight for DC's EECBG-funded energy efficient lighting upgrade. | Energy Department photo, credit Chris Galm. Brighter Lights, Safer Streets Thanks to support from an Energy Department Recovery Act grant, Washington, DC streets are becoming brighter. May 1, 2012 A student gets hands-on experience in the electric sector during an internship and mentoring program with Northeast Utilities, through ARRA workforce development funding. | Photo courtesy of Office of Electricity Delivery and Energy Reliability. Building Tomorrow's Smart Grid Workforce Today Many community colleges, universities, utilities and manufacturers across America are taking smart, pragmatic steps to train the next generation of workers needed to modernize the nation's electric grid.

278

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 1, 2010 November 1, 2010 Weatherizing Wilkes-Barre October 28, 2010 Baltimore resident Paul Bennett installed 14 solar panels such as these on his historic row home with the help of a state solar grant and federal tax credit through the Recovery Act. | Energy Department Photo | Baltimore Vet Cuts Energy Bills With Solar Baltimore resident and disabled veteran Paul Bennett shares his experience utilizing state and federal grants and tax credits to install solar panels on his historic row home and cut energy costs. October 27, 2010 Mississippi's Cowboy Maloney stores saw increases of up to 90 percent on front-loading washing machines in April. | Photo courtesy of Flickr user Andrew Kelsall via the Creative Commons license Mississippi Residents Save Through Appliance Rebate Program

279

State Agency Recovery Act Funding  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agency Agency Recovery Act Funding .Alabama Alabama Public Service Commission $868,824 .Alaska Regulatory Commission of Alaska $767,493 .Arizona Arizona Corporation Commission $915,679 .Arkansas Arkansas Public Service Commission $822,779 .California California Public Utilities Commission $1,686,869 .Colorado The Public Utilities Commission of the State of Colorado $875,899 .Connecticut Connecticut Department of Public Utility Control $839,241 .Delaware Delaware Public Service Commission $772,254 .District of Columbia Public Service Commission of the District of Columbia $765,085 .Florida Florida Public Service Commission $1,217,160 .Georgia Georgia Public Service Commission $996,874 .Hawaii Hawaii Public Utilities Commission $782,834 .Idaho Idaho Public Utilities Commission $788,840 .Illinois

280

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 23, 2012 August 23, 2012 New Report Highlights Growth of America's Clean Energy Job Sector Taking a moment to break-down key findings from the latest Clean Energy Jobs Roundup. August 13, 2012 INFOGRAPHIC: Wind Energy in America August 3, 2012 A worker suppresses dust during the final demolition stages of the historic DP West site, located at Los Alamos National Laboratory's (LANL) Technical Area 21. The demolition was funded by the American Recovery and Reinvestment Act (ARRA) and is part of $212 million in ARRA funds the Lab received for environmental remediation. | Photo courtesy of Los Alamos National Laboratory. Photo of the Week: August 3, 2012 Check out our favorite energy-related photos! August 2, 2012 With new pipes and controls, the natural gas kilns Highland Craftsmen uses to produce poplar bark shingles will operate about 40 percent more efficiently, saving the company $5,000 a year in energy costs. | Photo courtesy of Highland Craftsmen.

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 7, 2010 September 7, 2010 MetroTek installed a 620kW solar panel system at Buckman's Inc. in Pottstown, PA. The Recovery Act-funded project is expected to save the pool chemical business $5 million over the next 25 years. | Photo Courtesy of MetroTek Electrical Services Pennsylvania Pool Chemical Business Soaks Up Rays Most people catching rays poolside don't realize this, but it takes a lot of energy to make swimming pool chemicals. So much so that Buckman's Inc., a small business in Pottstown, PA, decided to tap into a fitting energy source to help offset high energy costs from its pool chemical manufacturing facility: the sun. September 2, 2010 Ice storage coolers lie next to the central plant for the American Indian Cultural Center and Museum in Oklahoma City, OK. | Photo courtesy of the American Indian Cultural Center and Museum |

282

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 18, 2011 July 18, 2011 Secretary Chu speaks at the A123 Systems lithium-ion battery manufacturing plant in Romulus, Michigan, while employees look on. | Photo Courtesy of Damien LaVera, Energy Department Secretary Chu Visits Advanced Battery Plant in Michigan, Announces New Army Partnership Thirty new manufacturing plants across the country for electric vehicle batteries and components - including A123 in Michigan - were supported through the Recovery Act, meaning we'll have the capacity to manufacture enough batteries and components for 500,000 electric vehicles annually by 2015. July 26, 2011 Smart Meters Helping Oklahoma Consumers Save Hundreds During Summer Heat With already 32 days reaching over 100 degrees this summer, Oklahoma is certainly feeling the heat. But smart meters -- just one of the advanced

283

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 4, 2011 November 4, 2011 The Lawrence Community team, leadership pictured above, saved the highest total amount of any community. They hold a basketball signed by Kansas Governor Brownback. The basketball signifies both the sport's history in Kansas, as well as the fact that the average Kansas home has enough energy leaks in their home to equal a basketball-sized hole in their roof. 'Taking Charge': Kansans Save $2.3M in Challenge to Change Their Energy Behavior How did the Climate and Energy Project (CEP), a small environmental organization that has received Recovery Act funding, achieve $2.3 million in savings annually for Kansans? Learn more about the Take Charge Challenge, a 9-month competition in which residents across 16 communities competed against each other to save the most energy and money.

284

Recovery Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 14, 2010 May 14, 2010 PPG and MAG Team Up for Turbine Blade Research Two companies work together to move forward in the industry, researching materials and processes that could lead to stronger, more reliable wind blades. May 14, 2010 Energy Corps Takes Root in Montana, Seeks to Make America Greener For the last 17 years, AmeriCorps members have pledged to uphold their duties as public servants, vowing to "get things done for America-to make our people safer, smarter and healthier." But a new type of volunteering in Montana is adding one more thing to that list: making America greener. May 14, 2010 Recovery Act Funding Hundreds of Jobs in California Solar Power, Inc. of Roseville, Calif., does almost everything in solar photovoltaics - from manufacturing and testing to home solar panel

285

Unfunded Mandates Reform Act; Intergovernmental Consultation | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unfunded Mandates Reform Act; Intergovernmental Consultation Unfunded Mandates Reform Act; Intergovernmental Consultation Unfunded Mandates Reform Act; Intergovernmental Consultation The Department of Energy (DOE) today publishes a final statement of policy on intergovernmental consultation under the Unfunded Mandates Reform Act of 1995. The policy reflects the guidelines and instructions that the Director of the Office of Management and Budget (OMB) provided to each agency to develop, with input from State, local, and tribal officials, an intergovernmental consultation process with regard to significant intergovernmental mandates contained in a notice of proposed rulemaking. Unfunded Mandates Reform Act; Intergovernmental Consultation More Documents & Publications TEC Working Group Topic Groups Tribal Key Documents

286

Coastal Management Act (Georgia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Act (Georgia) Management Act (Georgia) Coastal Management Act (Georgia) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Wind Program Info State Georgia Program Type Environmental Regulations Siting and Permitting Provider Georgia Department of Natural Resources The Coastal Management Act provides enabling authority for the State to prepare and administer a coastal management program. The Act does not

287

Opencut Mining Act (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Opencut Mining Act (Montana) Opencut Mining Act (Montana) Opencut Mining Act (Montana) < Back Eligibility Utility Investor-Owned Utility Industrial Construction Municipal/Public Utility Installer/Contractor Rural Electric Cooperative Program Info State Montana Program Type Siting and Permitting Provider Montana Department of Environmental Quality The policy of the state is to provide adequate remedies to protect the environmental life support system from degradation and to prevent unreasonable depletion and degradation of natural resources from strip and underground mining. This Act imposes permitting and operating restrictions on opencut mining activities. The Act contains permitting, siting, and procedural requirements; more specific regulations can be found in the Administrative Rules of Montana

288

Comprehensive Environmental Cleanup and Responsibility Act (Montana) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comprehensive Environmental Cleanup and Responsibility Act Comprehensive Environmental Cleanup and Responsibility Act (Montana) Comprehensive Environmental Cleanup and Responsibility Act (Montana) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Tribal Government Institutional Fuel Distributor Savings Category Buying & Making Electricity Program Info State Montana Program Type Environmental Regulations Provider Montana Department of Environmental Quality The Comprehensive Environmental Cleanup and Responsibility Act contains general provisions (sections 705-729), along with the Voluntary Cleanup and Redevelopment Act (sections 730-738) and the Controlled Allocation of

289

CALIFORNIA RECOVERY ACT SNAPSHOT | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CALIFORNIA RECOVERY ACT SNAPSHOT CALIFORNIA RECOVERY ACT SNAPSHOT CALIFORNIA RECOVERY ACT SNAPSHOT California has substantial natural resources, including oil, gas, solar, wind, geothermal, and hydroelectric power .The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in California are supporting a broad range of clean energy projects, from energy efficiency and the smart grid to solar and wind, geothermal and biofuels, carbon capture and storage, and environmental cleanup. Through these investments, California's businesses, universities, national labs, non-profits, and local governments are creating quality jobs today and positioning California to play an important role in the new energy economy

290

CALIFORNIA RECOVERY ACT SNAPSHOT | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CALIFORNIA RECOVERY ACT SNAPSHOT CALIFORNIA RECOVERY ACT SNAPSHOT CALIFORNIA RECOVERY ACT SNAPSHOT California has substantial natural resources, including oil, gas, solar, wind, geothermal, and hydroelectric power .The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in California are supporting a broad range of clean energy projects, from energy efficiency and the smart grid to solar and wind, geothermal and biofuels, carbon capture and storage, and environmental cleanup. Through these investments, California's businesses, universities, national labs, non-profits, and local governments are creating quality jobs today and positioning California to play an important role in the new energy economy

291

Water Management Act (Massachusetts) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Act (Massachusetts) Management Act (Massachusetts) Water Management Act (Massachusetts) < Back Eligibility Agricultural Industrial Institutional Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Buying & Making Electricity Water Home Weatherization Program Info State Massachusetts Program Type Environmental Regulations Provider Department of Environmental Protection This Act regulates and registers water withdrawals in the Commonwealth of Massachusetts to enable effective planning and management of water use and conservation. The Act establishes a Water Resources Management Advisory Committee within the MA Department of Environmental Protection to oversee the development of standards, rules and regulations for water resources

292

Grass Conservation Act (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grass Conservation Act (Montana) Grass Conservation Act (Montana) Grass Conservation Act (Montana) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Tribal Government Institutional Transportation Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Montana Program Type Siting and Permitting Provider Montana Department of Natural Resources and Conservation The Grass Conservation Act provides for the conservation, protection, restoration, and proper utilization of grass, forage, and range resource of the state of Montana. The Act establishes the Montana Grass Conservation Commission to coordinate between the Department and Conservation Districts

293

Unfunded Mandates Reform Act; Intergovernmental Consultation | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Unfunded Mandates Reform Act; Intergovernmental Consultation Unfunded Mandates Reform Act; Intergovernmental Consultation Unfunded Mandates Reform Act; Intergovernmental Consultation The Department of Energy (DOE) today publishes a final statement of policy on intergovernmental consultation under the Unfunded Mandates Reform Act of 1995. The policy reflects the guidelines and instructions that the Director of the Office of Management and Budget (OMB) provided to each agency to develop, with input from State, local, and tribal officials, an intergovernmental consultation process with regard to significant intergovernmental mandates contained in a notice of proposed rulemaking. Unfunded Mandates Reform Act; Intergovernmental Consultation More Documents & Publications TEC Working Group Topic Groups Tribal Key Documents

294

EM Recovery Act Performance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mission » Recovery Act » EM Recovery Act Performance Mission » Recovery Act » EM Recovery Act Performance EM Recovery Act Performance Footprint Reduction The Office of Environmental Management's (EM) American Recovery and Reinvestment Act Program recently achieved 74 percent footprint reduction, exceeding the originally established goal of 40 percent. EM has reduced its pre-Recovery Act footprint of 931 square miles, established in 2009, by 690 square miles. Reducing its contaminated footprint to 241 square miles has proven to be a monumental task, and a challenge the EM team was ready to take on from the beginning. In 2009, EM identified a goal of 40 percent footprint reduction by September 2011 as its High Priority Performance Goal. EM achieved that goal in April 2011, five months ahead of schedule, and continues to achieve

295

IOWA RECOVERY ACT SNAPSHOT | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IOWA RECOVERY ACT SNAPSHOT IOWA RECOVERY ACT SNAPSHOT IOWA RECOVERY ACT SNAPSHOT Iowa has substantial natural resources, including wind power and is the largest ethanol producer in the United States. The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Iowa are supporting a broad range of clean energy projects, from energy efficiency and the smart grid to the Ames Laboratory. Through these investments, Iowa's businesses, universities, national labs, non-profits, and local governments are creating quality jobs today and positioning Iowa to play an important role in the new energy economy of the future. IOWA RECOVERY ACT SNAPSHOT More Documents & Publications Iowa Recovery Act State Memo

296

National Energy Act statutes and solar energy  

DOE Green Energy (OSTI)

The National Energy Act of 1978 contains many provisions that will significantly affect solar technology commercialization and solar energy users. Four of the five statutes that comprise the National Energy Act deserve close attention. The National Energy Conservation Policy Act will promote residential solar installations. The Energy Tax Act will accelerate both residential and commercial solar system applications. The Public Utilities Regulatory Policies Act promotes efficient use of utility resources as well as decentralized power production. And, the Power Plan and Industrial Fuel Use Act places severe restrictions on future burning of petroleum and natural gas, which should lead some operators to build or convert to solar energy systems. Each of the preceding acts are considered in separate sections of this report. Federal regulations issued pursuant to the various provisions are also identified and discussed, and some of the problems with the provisions and regulations are noted.

Howard, J.

1980-02-01T23:59:59.000Z

297

National Flood Insurance Act | Open Energy Information  

Open Energy Info (EERE)

Flood Insurance Act Flood Insurance Act Jump to: navigation, search Statute Name National Flood Insurance Act Year 1968 Url [[File:|160px|link=]] Description References FEMA Library[1] Wikipedia[2] The National Flood Insurance Act of 1968 is a piece of legislation passed in the United States that led to the creation of the National Flood Insurance Program (NFIP). The National Flood Insurance Act of 1968 created the Federal Insurance Administration and made flood insurance available for the first time. The Flood Disaster Protection Act of 1973 made the purchase of flood insurance mandatory for the protection of property located in Special Flood Hazard Areas. The National Flood Insurance Act is administered by the Federal Emergency Management Agency. The NFIP goals are two-fold:

298

Freedom of Information Act (FOIA) and Privacy Act Requests | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Freedom of Information Act (FOIA) Freedom of Information Act (FOIA) and Privacy Act Requests Freedom of Information Act (FOIA) and Privacy Act Requests FOIA and Privacy Act Requests FOIA Requests FOIA information can be found at http://energy.gov/management/office-management/operational-management/freedom-information-act. Privacy Act Requests Privacy Act requests can not be submitted electronically. They must be submitted in writing or in person to: Cathy Harrell U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Be sure to include as much information as you can about when and where you worked, what records you are requesting, sign the request, and include copies of 2 forms of ID or a photo ID. You must either have your request notarized or 1) acknowledge that you understand the criminal penalty in the Privacy Act for requesting or

299

Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) - List of Covered Electric Utilities. Public Utility Regulatory Policies Act of 1978 (PURPA)...

300

NNSA Acting Administrator Bruce Held holds all hands meeting...  

NLE Websites -- All DOE Office Websites (Extended Search)

Media Room > Photo Gallery > NNSA Acting Administrator Bruce Held holds all ... NNSA Acting Administrator Bruce Held holds all hands meeting NNSANews posted a photo: NNSA Acting...

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Clean Air Act General Conformity Requirements and the National...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clean Air Act General Conformity Requirements and the National Environmental Policy Act Process Clean Air Act General Conformity Requirements and the National Environmental Policy...

302

Nuclear Waste Policy Act Signed | National Nuclear Security Administra...  

National Nuclear Security Administration (NNSA)

> Nuclear Waste Policy Act Signed Nuclear Waste Policy Act Signed January 07, 1983 Washington, DC Nuclear Waste Policy Act Signed President Reagan signs the Nuclear Waste...

303

Methane Hydrate Research and Development Act of 2000 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research and Development Act of 2000 Methane Hydrate Research and Development Act of 2000 Methane Hydrate Research and Development Act of 2000 Methane Hydrate Research and...

304

Acting Assistant Secretary for DOE Office of Environmental Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Acting Assistant Secretary for DOE Office of Environmental Management Visits Hanford - First Visit, Commemorates Completion of Major Recovery Act Project Acting Assistant Secretary...

305

TECHNOLOGY TRANSFER COMMERCIALIZATION ACT OF 2000 PDF | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TECHNOLOGY TRANSFER COMMERCIALIZATION ACT OF 2000 PDF TECHNOLOGY TRANSFER COMMERCIALIZATION ACT OF 2000 PDF TECHNOLOGY TRANSFERCOMMERCIALIZATION ACT OF 2000 TECHNOLOGY TRANSFER...

306

TECHNOLOGY TRANSFER COMMERCIALIZATION ACT OF 2000 PDF | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TECHNOLOGY TRANSFER COMMERCIALIZATION ACT OF 2000 PDF TECHNOLOGY TRANSFER COMMERCIALIZATION ACT OF 2000 PDF TECHNOLOGY TRANSFER COMMERCIALIZATION ACT OF 2000 PDF TECHNOLOGY...

307

FY 2007 FAIR ACT INVENTORY REASON CODES | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07 FAIR ACT INVENTORY REASON CODES FY 2007 FAIR ACT INVENTORY REASON CODES FY 2007 FAIR ACT INVENTORY REASON CODES More Documents & Publications OFFICE OF PROCUREMENT &...

308

Vermont Recovery Act State Memo | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vermont Recovery Act State Memo Vermont Recovery Act State Memo The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and...

309

Colorado Recovery Act State Memo | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Colorado Recovery Act State Memo Colorado Recovery Act State Memo The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and...

310

American Recovery and Reinvestment Act of 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2009 3pm Contracts , 2009 3pm Contracts [Use as an H clause or include under the Laws, Regulations and Directives clause.] H.999 Special provisions relating to work funded under American Recovery and Reinvestment Act of 2009 (Feb 2009) Preamble: Work performed under this contract will be funded, in whole or in part, with funds appropriated by the American Recovery and Reinvestment Act of 2009, Pub. L. 111-5, (Recovery Act or Act). The Recovery Act's purposes are to stimulate the economy and to create and retain jobs. The Act gives preference to activities that can be started and completed expeditiously, including a goal of using at least 50 percent of the funds made available by it for activities that can be initiated not later than June 17, 2009. Contractors should begin planning activities for their first tier subcontractors, including

311

Fair Act Inventory | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fair Act Inventory Fair Act Inventory Fair Act Inventory This page provides guidance for submission of the DOE FAIR Act Inventory, or otherwise known as the Inherently Governmental Commercial Activities (IGCA) Inventory. This inventory will be used to respond to various reporting requirements including, but not limited to, the Federal Activities Inventory Reform Act of 1998, Public Law 105-270 (FAIR Act) and the inventory of inherently governmental activities required by OMB. OMB requires the submission of the IGCA Inventory in a specified electronic format. As a result, an updated version of the collection tool used last year is provided along with this guidance. This data collection tool is somewhat different than the tool used by OMB. However, the data fields can be easily converted to the OMB tool and will be completed by OPAM.

312

Recovery Act Milestones | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Milestones Milestones Recovery Act Milestones Addthis Description Every 100 days, the Department of Energy is held accountable for a progress report on the American Recovery and Reinvestment Act. Update at 200 days, hosted by Matt Rogers, Senior Advisor to Secretary Steven Chu for Recovery Act Implementation. Speakers Matt Rogers Duration 3:07 Topic Energy Efficiency Batteries Recovery Act Energy Policy Credit Energy Department Video MATTHEW ROGERS: So I'm Matt Rogers. I'm the senior adviser to the secretary for Recovery Act implementation. And Saturday, September the 5th, was the 200th day of the Recovery Act. And it should be no surprise that we are accountable every hundred days; so it was a good chance to reflect on what we've accomplished and where we're headed over the next

313

California Environmental Quality Act | Open Energy Information  

Open Energy Info (EERE)

Act Act Jump to: navigation, search Statute Name California Environmental Quality Act Year 1970 Url [[File:|160px|link=http://en.wikipedia.org/wiki/California_Environmental_Quality_Act]] Description References Wikipedia[1] CERES Webpage[2] CDOFG Webpage[3] The California Environmental Quality Act (CEQA) is a California statute passed in 1970, shortly after the United States federal government passed the National Environmental Policy Act (NEPA), to institute a statewide policy of environmental protection. CEQA does not directly regulate land uses, but instead requires state and local agencies within California to follow a protocol of analysis and public disclosure of environmental impacts of proposed projects and adopt all feasible measures to mitigate those impacts.[1] CEQA makes environmental protection a mandatory part of

314

Safe Drinking Water Act | Open Energy Information  

Open Energy Info (EERE)

Act Act Jump to: navigation, search Statute Name Safe Drinking Water Act Year 1974 Url SDWA.jpg Description The Safe Drinking Water Act was established to protect the quality of drinking water in the U.S. References SDWA of 1974[1] Federal Oil and Gas[2] The Safe Drinking Water Act was established to protect the quality of drinking water in the U.S. This law focuses on all waters actually or potentially designated for drinking use, whether from above ground or underground sources. The Act authorized EPA to establish safe standards of purity and required all owners or operators of public water systems to comply with primary (health-related) standards. State governments, which assume this power from EPA, also encourage attainment of secondary standards (nuisance-related).

315

National Historic Preservation Act | Open Energy Information  

Open Energy Info (EERE)

Act Act Jump to: navigation, search Statute Name National Historic Preservation Act Year 1966 Url [[File:|160px|link=http://www.achp.gov/docs/nhpa%202008-final.pdf]] Description 16 USC 470a et seq (2006) and implementing regulations at 36 CFR 800 (2008) References Advisory Council on Historic Preservation[1] (pdf) National Historic Preservation Act[2] 16 USC 470a et seq (2006) and implementing regulations at 36 CFR 800 (2008) The goal of the National Historic Preservation Act (NHPA), which established the Advisory Council on Historic Preservation (ACHP) in 1966, is to have federal agencies act as responsible stewards of our nation's resources when their actions affect historic properties. The ACHP is the only entity with the legal responsibility to encourage federal agencies to

316

Coastal Zone Management Act | Open Energy Information  

Open Energy Info (EERE)

Zone Management Act Zone Management Act Jump to: navigation, search Statute Name Coastal Zone Management Act Year 1972 Url [[File:|160px|link=]] Description The Coastal Zone Management Act of 1972 (CZMA; Pub.L. 92-583, 86 Stat. 1280, enacted October 27, 1972, 16 U.S.C. §§ 1451-1464, Chapter 33) is an Act of Congress passed in 1972 to encourage coastal states to develop and implement coastal zone management plans (CZMPs). This act was established as a United States National policy to preserve, protect, develop, and where possible, restore or enhance, the resources of the Nation's coastal zone for this and succeeding generations. References Wikipedia[1] National Oceanic and Atmospheric Administration[2] The U.S. Congress recognized the importance of meeting the challenge of

317

Coastal Barrier Resources Act | Open Energy Information  

Open Energy Info (EERE)

Barrier Resources Act Barrier Resources Act Jump to: navigation, search Statute Name Coastal Barrier Resources Act Year 1982 Url [[File:|160px|link=]] Description References Wikipedia[1] FWS Coastal Barrier Resources Act Webpage[2] The Coastal Barrier Resources Act of the United States was enacted October 18, 1982. The United States Congress passed this Act in order to address the many problems associated with coastal barrier development. CBRA designated various undeveloped coastal barriers, which were illustrated by a set of maps adopted by law, to be included in the John H. Chafee Coastal Barrier Resources System (CBRS). These designated areas were made ineligible for both direct and indirect Federal expenditures and financial assistance, which are believed to encourage development of fragile,

318

American Recovery and Reinvestment Act of 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2009 Contracts 1, 2009 Contracts [Use as an H clause or include under the Laws, Regulations and Directives clause.] H.999 Special provisions relating to work funded under American Recovery and Reinvestment Act of 2009 (Feb 2009) Preamble: Work performed under this contract will be funded, in whole or in part, with funds appropriated by the American Recovery and Reinvestment Act of 2009, Pub. L. 111-5, (Recovery Act or Act). The Recovery Act's purposes are to stimulate the economy and to create and retain jobs. The Act gives preference to activities that can be started and completed expeditiously, including a goal of using at least 50 percent of the funds made available by it for activities that can be initiated not later than June 17, 2009. Contractors should begin planning activities for their first tier subcontractors, including

319

Overview of Recovery Act FAR Clauses  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act FAR Clauses Recovery Act FAR Clauses The Table below provides a brief overview of the FAR clauses in FAC 2005-32. These clauses and H.999 Special provisions relating to work funded under American Recovery and Reinvestment Act of 2009 must be incorporated into all contracts and orders that will have Recovery Act funds. ARRA Requirement Clause Number Prescription 52.225-21 Include in Recovery Act funded contracts for construction projects under $7,443,000 - replaces 52.225-9 52.225-22 Include if using 52.225-21 - replaces 52.225-10 52.225-23 Include Recovery Act funded contracts for construction projects of $7,443,000 or more - replaces 52.225-11 Section 1605 Buy American 52.225-24 Include if using 52.225-23 - replaces 52.225-12 Section 1552 Whistleblower

320

Recovery Act State Memos Washington, DC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, DC Washington, DC For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Recovery Act State Memos North Dakota  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dakota Dakota For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

322

Recovery Act State Memos South Dakota  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dakota Dakota For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

323

Recovery Act State Memos South Carolina  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carolina Carolina For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

324

Recovery Act State Memos New York  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

York York For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 6

325

Recovery Act State Memos New Jersey  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Jersey Jersey For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

326

Recovery Act State Memos North Carolina  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carolina Carolina For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

327

Recovery Act State Memos Puerto Rico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Puerto Rico Puerto Rico For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 5

328

Recovery Act State Memos New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mexico Mexico For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

329

Recovery Act State Memos Rhode Island  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rhode Island Rhode Island For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

330

Recovery Act State Memos New Hampshire  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hampshire Hampshire For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 4

331

Paul Cunningham-Acting Associate CIO for Cybersecurity & Acting Chief  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Paul Cunningham-Acting Associate CIO for Cybersecurity & Acting Paul Cunningham-Acting Associate CIO for Cybersecurity & Acting Chief Information Security Officer Paul Cunningham-Acting Associate CIO for Cybersecurity & Acting Chief Information Security Officer Paul Cunningham-Acting Associate CIO for Cybersecurity & Acting Chief Information Security Officer As the acting Associate Chief Information Officer for Cybersecurity, Mr. Cunningham serves as the Department's Chief Information Security Officer charged with managing the agency's enterprise cybersecurity program. Mr. Cunningham advises the Department's CIO and senior agency officials in the implementation of cybersecurity and the Department's Risk Management Approach. Mr. Cunningham provides executive leadership and guidance for joint agency and Administration cybersecurity initiatives including for the

332

Environmental Protection Act (Newfoundland and Labrador, Canada) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Protection Act (Newfoundland and Labrador, Canada) Protection Act (Newfoundland and Labrador, Canada) Environmental Protection Act (Newfoundland and Labrador, Canada) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Newfoundland and Labrador Program Type Environmental Regulations The broad-ranging Environmental Protection Act has sections on waste

333

American Recovery and Reinvestment Act of 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2009 financial assistance 4, 2009 financial assistance Special provisions relating to work funded under American Recovery and Reinvestment Act of 2009 (Mar 2009) [Prescription: This clause must be included in all grants, cooperative agreements and TIAs (new or amended) when funds appropriated under the Recovery Act are obligated to the agreement.] Preamble The American Recovery and Reinvestment Act of 2009, Pub. L. 111-5, (Recovery Act) was enacted to preserve and create jobs and promote economic recovery, assist those most impacted by the recession, provide investments needed to increase economic efficiency by spurring technological advances in science and health, invest in transportation, environmental protection, and other infrastructure that will provide long-

334

Wetlands Protection Act (Massachusetts) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Protection Act (Massachusetts) Protection Act (Massachusetts) Wetlands Protection Act (Massachusetts) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Massachusetts Program Type Environmental Regulations Provider Department of Environmental Protection This Act establishes regulations regarding the removal, dredging, filling,

335

Recovery Act State Memos American Samoa  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

American American Samoa For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ................................................................................................ 1 For total Recovery Act jobs numbers in American Samoa go to www.recovery.gov

336

NETL National Environmental Policy Act (NEPA) Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Staff Bios CONTACT NETL Visiting NETL People Search Go to US DOE Publications NETL National Environmental Policy Act (NEPA) Documents NETL Categorical Exclusions NETL...

337

Canada Oil and Gas Operations Act (Canada)  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of this Act is to promote safety, the protection of the environment, the conservation of oil and gas resources, joint production arrangements, and economically efficient infrastructures.

338

Recovery Act State Memos Virgin Islands  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Virgin Virgin Islands For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 For total Recovery Act jobs numbers in the U.S. Virgin Islands go to www.recovery.gov

339

Shore Protection Act (Georgia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Shore Protection Act (Georgia) Shore Protection Act (Georgia) Shore Protection Act (Georgia) < Back Eligibility Commercial Construction Developer Industrial Investor-Owned Utility Transportation Utility Savings Category Water Buying & Making Electricity Program Info State Georgia Program Type Environmental Regulations Siting and Permitting Provider Georgia Department of Natural Resources The Shore Protection Act is the primary legal authority for protection and management of Georgia's shoreline features including sand dunes, beaches, sandbars, and shoals, collectively known as the sand-sharing system. The value of the sand-sharing system is recognized as vitally important in protecting the coastal marshes and uplands from Atlantic storm activity, as well as providing valuable recreational opportunities.

340

Energy Monitoring Act (Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Monitoring Act (Canada) Energy Monitoring Act (Canada) Energy Monitoring Act (Canada) < Back Eligibility Commercial Developer Fuel Distributor Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative State/Provincial Govt Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Alberta Program Type Environmental Regulations Generation Disclosure Provider Minister of Natural Resources This act requires that every energy enterprise file with the Minister a return setting out statistics and information relating to its ownership and control; financial information; information, including financial, about its exploration for, development, production, processing, refining and

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Mississippi Public Utility Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mississippi Public Utility Act Mississippi Public Utility Act Mississippi Public Utility Act < Back Eligibility Commercial Construction Developer General Public/Consumer Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Mississippi Program Type Industry Recruitment/Support Siting and Permitting Provider Public Service Commission The Mississippi Public Utility Act is relevant to any project that plans to generate energy. It requires that a utility must first obtain a Certificate of Public Convenience and Necessity (CPCN) from the Mississippi Public Service Commission (PSC) before commencing construction of a new electric

342

Minnesota Environmental Coordination Procedures Act (Minnesota) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Minnesota Environmental Coordination Procedures Act (Minnesota) Minnesota Environmental Coordination Procedures Act (Minnesota) Minnesota Environmental Coordination Procedures Act (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Minnesota Program Type Siting and Permitting This Act is designed to streamline the review procedures for a given

343

Forest Conservation Act (Maryland) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Forest Conservation Act (Maryland) Forest Conservation Act (Maryland) Forest Conservation Act (Maryland) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Local Government Municipal/Public Utility Nonprofit Retail Supplier Rural Electric Cooperative State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Maryland Program Type Environmental Regulations Siting and Permitting Provider Maryland Department of Natural Resources The main purpose of Maryland's Forest Conservation Act is to minimize the loss of Maryland's forest resources during land development by making the

344

Recovery Act Measurement Science and Engineering ...  

Science Conference Proceedings (OSTI)

... by the Act or that may be added to the recipient's award pursuant to guidance implemented by the Office of Management and Budget. ...

2010-10-05T23:59:59.000Z

345

Coal Mining Regulatory and Reclamation Act (Massachusetts) |...  

Open Energy Info (EERE)

Data Page Edit with form History Share this page on Facebook icon Twitter icon Coal Mining Regulatory and Reclamation Act (Massachusetts) This is the approved revision of...

346

Compressed Air Energy Storage Act (Kansas)  

Energy.gov (U.S. Department of Energy (DOE))

This act lays out regulations for the local authorities related to site selection, design, operation and monitoring for underground storage of compressed air.

347

Americans with Disabilities Act Signed (1990)  

Energy.gov (U.S. Department of Energy (DOE))

The Americans with Disabilities Act of 1990 (ADA) prohibits discrimination and ensures equal opportunity for persons with disabilities in employment, State and local government services, public...

348

Migratory Bird Treaty Act: Lessons Learned  

NLE Websites -- All DOE Office Websites (Extended Search)

January 17, 2013 1 THERESA ALDRIDGE, PACIFIC NORTHWEST SITE OFFICE NEPA Compliance Office Richland Washington Migratory Bird Treaty Act: Lessons Learned Along with 800 other...

349

Wetland Conservation Act (Minnesota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& Permitting This chapter of the Minnesota Administrative Rules implements the Wetland Conservation Act of 1991, setting standards for water preservation, withdrawal, and...

350

Summary of America Invents Act - JLab  

1 Summary of America Invents Act (AIA), signed into law on Sept. 16, 2011 35 USC 102 Conditions for Patentability; Novelty (Effective Date March 16, ...

351

No Fear Act | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

employees resulting from whistleblower complaints, and complaints before the Merit Systems Protection Board and the Equal Employment Opportunity Commission. The No Fear Act...

352

Remarks from the Acting Deputy Secretary  

Energy.gov (U.S. Department of Energy (DOE))

Remarks as prepared for delivery by Acting Deputy Secretary of Energy Jeffrey Kupfer; State of Environmental Justice in America; May 22, 2008; Washington, DC.

353

Extremely Hazardous Substances Risk Management Act (Delaware)  

Energy.gov (U.S. Department of Energy (DOE))

This act lays out provisions for local governments to implement regulations and standards for the management of extremely hazardous substances, which are defined and categorized as follows:

354

Environmental Management and Protection Act, 2010 (Saskatchewan)  

Energy.gov (U.S. Department of Energy (DOE))

The Environmental Management and Protection Act of 2010 protects air, land, water resources and ecosystems of the province by managing and regulating potentially harmful activities and substances....

355

Pollution Prevention Act (Delaware) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pollution Prevention Act (Delaware) Pollution Prevention Act (Delaware) Pollution Prevention Act (Delaware) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State Delaware Program Type Environmental Regulations This act lays out objectives for pollution prevention, education and outreach. The Department shall create a multimedia waste reduction assistance program to provide technical assistance to targeted industries, focusing on small

356

Comment re Price-Anderson Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comment re Price-Anderson Act Comment re Price-Anderson Act Letter to DOE General Counsel from Marilyn Gayle Hoff re renewal of the Price-Anderson Act Comment re Price-Anderson Act...

357

Data Protection IMPORTANT Public Records Act 44  

E-Print Network (OSTI)

Data Protection IMPORTANT ­ Public Records Act 44 Occasionally LSU Health Sciences Center receives involve disclosing data from your LSUHSC Payroll/Personnel file. You may elect to have your home address Act. Please complete the data below and return this form to the Benefits Service Center, Room 608

358

California's Energy Recovery and Reinvestment Act  

E-Print Network (OSTI)

California's Energy Recovery and Reinvestment Act P I iti tiProgram Initiatives November 18, 2009 Director Economic Stimulus Program California Energy CommissionCalifornia Energy Commission #12 Act (ARRA) Energy Programs · Programs the Energy Commission is Administering · Workforce Opportunities

359

"Recovery Act: Training Program Development for Commercial Building...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Act: Training Program Development for Commercial Building Equipment Technicians, Building Operators, and Energy Commissioning AgentsAuditors" "Recovery Act: Training...

360

Water Resources Planning and Coordination Act (South Carolina...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resources Planning and Coordination Act (South Carolina) Water Resources Planning and Coordination Act (South Carolina) Eligibility Agricultural Commercial Construction Industrial...

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Toxics Use Reduction Act (Massachusetts) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Toxics Use Reduction Act (Massachusetts) Toxics Use Reduction Act (Massachusetts) Eligibility Agricultural Commercial Construction Fuel Distributor Industrial Institutional...

362

1st FY 2001 Emergency Supplemental Appropriations Act  

Science Conference Proceedings (OSTI)

Taken from PL 107-38 1st FY 2001 Emergency Supplemental Appropriations Act. An Act. Making emergency supplemental ...

2010-10-05T23:59:59.000Z

363

Aligning National Environmental Policy Act Process with Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Aligning National Environmental Policy Act Process with Environmental Management Systems Aligning National Environmental Policy Act Process with Environmental Management Systems...

364

National Environmental Policy Act (NEPA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Environmental Policy Act (NEPA) National Environmental Policy Act (NEPA) Calibration Facilities Ecosystem Management Team Environmental Justice Environmental Management...

365

DOE Policy Re Recovery Act Recipient Use of Recovery Act Logos on Signage  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INTERIM GUIDANCE INTERIM GUIDANCE May 12, 2010 TO: Program Office Leadership FROM: [Matt Rogers] SUBJECT: DOE Policy Re Recovery Act Recipient Use of Recovery Act Logos on Signage This memorandum clarifies the U.S. Department of Energy ("DOE") policy regarding use of the Recovery Act logo by Recovery Act recipients and subgrantees. The appropriate use of the logo will serve to highlight the Recovery Act's positive impact while preventing potential misrepresentations. Signs and websites are a useful part of efforts to increase accountability and transparency into how American taxpayer dollars are being spent through Recovery Act efforts. Signage: * DOE permits the use of Recovery Act logos and/or the text, "U.S. Department of Energy" or "Department of Energy," on any Recovery Act recipient physical or structural

366

Clean Air Act | Open Energy Information  

Open Energy Info (EERE)

Clean Air Act Clean Air Act Jump to: navigation, search Statute Name Clean Air Act Year 1970 Url CAA.jpg Description Congress passed the CAA in 1970 in order to combat air pollution in the United States and protect the health and general welfare of United States citizens against air pollutants. References CAA[1] Federal Oil and Gas[2] Contents 1 Introduction 2 Title I Air Pollution Prevention 3 Title II Emission Standards for Moving Sources 4 Title III General Provisions 5 Title IV Acid Deposition Control 6 Title V Permits 7 Title VI Stratospheric Ozone Protection 8 References Introduction The Clean Air Act was enacted by congress in 1990. Since then only minor changes have been made. The act is just a law ensuring that the EPA will follow certain guidelines and definitions for protecting and improving the

367

Clean Water Act | Open Energy Information  

Open Energy Info (EERE)

Clean Water Act Clean Water Act Year 1972 Url CWA.jpg Description The Clean Water Act was established to restore and maintain the chemical, physical, and biological integrity of the nation's waters. References CWA[1] Federal Oil and Gas[2] The Clean Water Act (CWA) (33 U.S.C. § 1251 et seq.) - The Clean Water Act was established to restore and maintain the chemical, physical, and biological integrity of the nation's waters. The CWA aims to protect water quality through development of water quality standards, anti-degradation policies, water quality permitting procedures, water body monitoring and assessment programs, and elimination or point and nonpoint pollution sources. The CWA regulates the National Pollutant Discharge Elimination System (NPDES) permitting process, which establishes, through a permit,

368

Privacy Act Statement | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Statement | National Nuclear Security Administration Statement | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Privacy Act Statement Home > About Us > Our Operations > NNSA Office of General Counsel > Privacy Act (PA) of 1974 > Privacy Act Statement Privacy Act Statement Agency forms used to collect personal information protected by the Act must

369

Oil Pollution Act | Open Energy Information  

Open Energy Info (EERE)

Pollution Act Pollution Act Jump to: navigation, search Statute Name Oil Pollution Act Year 1990 Url OPA.jpg Description The Oil Pollution Act (OPA) of 1990 streamlined and strengthened EPA's ability to prevent and respond to catastrophic oil spills. References OPA[1] Federal Oil and Gas[2] The Oil Pollution Act (OPA) of 1990 streamlined and strengthened EPA's ability to prevent and respond to catastrophic oil spills. A trust fund financed by a tax on oil is available to clean up spills when the responsible party is incapable or unwilling to do so. The OPA requires oil storage facilities and vessels to submit to the federal government response plans detailing how they will respond to large discharges. EPA has published regulations for aboveground storage facilities; the Coast Guard

370

OE Recovery Act Archive | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Act » OE Recovery Act Archive Act » OE Recovery Act Archive OE Recovery Act Archive 2011 July 26, 2011: BLOG Smart Meters Helping Oklahoma Consumers Save Hundreds During Summer Heat Smart meters -- just one of the advanced technologies being used to modernize the grid -- are helping Oklahoma businesses and home owners beat high electricity bills not only during these summer months, but year-round. July 26, 2011: PRESS RELEASE CenterPoint Energy has released survey results from a 500 participant smart meter In-Home Display pilot program showing that 71 percent of customers changed their electricity consumption behavior as a result of the energy use data they accessed on their in-home displays. The results were released while U.S. Deputy Secretary of Energy Daniel B. Poneman visited Houston to

371

Global Change Research Act of 1990  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Change Research Act of 1990 Print E-mail Global Change Research Act of 1990 Print E-mail The U.S. Global Change Research Program (USGCRP) was established by Presidential initiative in 1989 and mandated by Congress in the Global Change Research Act (GCRA) of 1990 in order to "assist the nation and the world to understand, assess, predict, and respond to human-induced and natural processes of global change." In consultation with White House officials and the Subcommittee on Global Change Research (SGCR), USGCRP's Executive Director ensures that the Program meets all mandated requirements which are summarized in the table below. Global Change Research Act of 1990 Requirements Please click on the buttons below for further details about the Global Change Research Act of 1990. Public Law 101-606(11/16/90) 104 Stat. 3096-3104

372

The American Jobs Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The American Jobs Act The American Jobs Act The American Jobs Act September 9, 2011 - 6:30am Addthis Auto industry workers retrain on wind installation in Elyria, Ohio | Energy Department Image | Photo by Quentin Kruger (Contractor) Auto industry workers retrain on wind installation in Elyria, Ohio | Energy Department Image | Photo by Quentin Kruger (Contractor) Secretary Chu Secretary Chu Former Secretary of Energy Last night the President laid out the American Jobs Act, a specific, tangible, bi-partisan strategy for putting Americans back to work. This plan will cut taxes for small businesses and put more money into the pockets of hard working Americans, without adding a dime to the Federal deficit. As part of his jobs proposal, President Obama called on Congress to pass the bi-partisan Kerry-Hutchison BUILD Act, which would establish a national

373

Freedom of Information Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Management » Freedom of Information Act Operational Management » Freedom of Information Act Freedom of Information Act The Office of Information Resources is responsible for administering policies, programs, and procedures to ensure DOE compliance with the Freedom of Information Act (FOlA), 5 U.S.C. 552. The resources on these pages are provided to aid in finding answers to questions about programs of the Department of Energy and to obtain information that is publicly available without submitting a FOlA request. You may also search on the FOIA Portal that consists of documents previously released under the FOIA. If the information is not available here, submit a Freedom of Information Act request electronically. You may also mail in your FOIA request to the following address: FOIA Requester Service Center

374

Solar Rights Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rights Act Rights Act Solar Rights Act < Back Eligibility Agricultural Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Swimming Pool Heaters Water Heating Program Info State California Program Type Solar/Wind Access Policy The Solar Rights Act (CA Civil Code 714), enacted in 1978, bars restrictions by homeowners associations (HOAs) on the installation of solar-energy systems, but originally did not specifically apply to cities, counties, municipalities or other public entities. The Act was amended in September 2003 to prohibit a public entity from receiving state grant funding or loans for solar-energy programs if the entity prohibits or

375

Recovery Act Reports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 22, 2011 August 22, 2011 Audit Report: OAS-RA-11-11 The Advanced Research Projects July 28, 2011 Audit Report: OAS-RA-11-10 The Department of Energy's American Recovery and Reinvestment Act - California State Energy Program July 21, 2011 Audit Report: OAS-RA-L-11-10 Department of Energy's Controls over Recovery Act Spending at the Idaho National Laboratory July 7, 2011 Audit Report: OAS-RA-L-11-09 Performance of Recovery Act Funds at the Waste Isolation Pilot Plant June 13, 2011 Audit Report: OAS-RA-11-09 The Department of Energy's Weatherization Assistance Program under the American Recovery and Reinvestment Act in the State of West Virginia June 6, 2011 Audit Report: OAS-RA-11-07 The Department of Energy's Weatherization Assistance Program Funded under the American Recovery and Reinvestment Act for the State of Wisconsin

376

DOE Recovery Act Awardees | OpenEI  

Open Energy Info (EERE)

Recovery Act Awardees Recovery Act Awardees Dataset Summary Description The data contained within the .xls is the latest list of DOE recovery act awardees. The list is to be updated weekly by the DOE. Source DOE Date Released December 10th, 2010 (3 years ago) Date Updated Unknown Keywords Awardees DOE Recovery Act Data application/vnd.ms-excel icon DOE Recovery Act Awardees - Dec 10 2010 (xls, 949.2 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Weekly Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL) Comment http://www.energy.gov/webpolicies.htm Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset Average vote Your vote Ease of access Average vote Your vote

377

Federal Energy Management Program: Recovery Act  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act Recovery Act The American Recovery and Reinvestment Act of 2009 included funding for the Federal Energy Management Program (FEMP) to facilitate the Federal Government's implementation of sound, cost-effective energy management and investment practices to enhance the nation's energy security and environmental stewardship. FEMP completed nearly 120 technical assistance projects through this effort. FEMP national laboratory teams and contractor service providers visited more than 80 Federal sites located throughout the U.S. The site visits were a key component of FEMP Recovery Act funded technical assistance activity, which provided more than $13.2 million in funding for direct technical assistance to energy managers across the Federal Government. This service helped agencies accelerate their Recovery Act projects and make internal management decisions for investment in energy efficiency and deployment of renewable energy.

378

Ohio Celebrates Recovery Act Weatherization Program Performance |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ohio Celebrates Recovery Act Weatherization Program Performance Ohio Celebrates Recovery Act Weatherization Program Performance Ohio Celebrates Recovery Act Weatherization Program Performance June 10, 2010 - 12:41pm Addthis Ohio Celebrates Recovery Act Weatherization Program Performance Joshua DeLung What are the key facts? More than 10,000 Ohio homes have been weatherized, making the state one of the national leaders in helping income-eligible families become more energy-efficient. Ohio has reached a milestone in the clean energy economy - more than 10,000 homes in the state have been weatherized, making the state one of the national leaders in helping income-eligible families become more energy-efficient. Ohio officials celebrated the success of weatherization work funded by the American Recovery and Reinvestment Act with about 100 attendees at a

379

Act Solar Inc | Open Energy Information  

Open Energy Info (EERE)

Solar Inc Solar Inc Jump to: navigation, search Name Act Solar Inc. Place Santa Clara, California Sector Solar Product California-based solar micro-inverter manufacturer and power management technology company. References Act Solar Inc.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Act Solar Inc. is a company located in Santa Clara, California . References ↑ "Act Solar Inc." Retrieved from "http://en.openei.org/w/index.php?title=Act_Solar_Inc&oldid=341733" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

380

Ohio Celebrates Recovery Act Weatherization Program Performance |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ohio Celebrates Recovery Act Weatherization Program Performance Ohio Celebrates Recovery Act Weatherization Program Performance Ohio Celebrates Recovery Act Weatherization Program Performance June 10, 2010 - 12:41pm Addthis Ohio Celebrates Recovery Act Weatherization Program Performance Joshua DeLung What are the key facts? More than 10,000 Ohio homes have been weatherized, making the state one of the national leaders in helping income-eligible families become more energy-efficient. Ohio has reached a milestone in the clean energy economy - more than 10,000 homes in the state have been weatherized, making the state one of the national leaders in helping income-eligible families become more energy-efficient. Ohio officials celebrated the success of weatherization work funded by the American Recovery and Reinvestment Act with about 100 attendees at a

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

IDAHO RECOVERY ACT SNAPSHOT | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IDAHO RECOVERY ACT SNAPSHOT IDAHO RECOVERY ACT SNAPSHOT IDAHO RECOVERY ACT SNAPSHOT Idaho has substantial natural resources, including wind, geothermal, and hydroelectric power .The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Idaho are supporting a broad range of clean energy projects, from energy efficiency and the smart grid to geothermal and alternative fuels, as well as major commitments to research efforts and environmental cleanup at the Idaho National Laboratory in Idaho Falls. Through these investments, Idaho's businesses, universities, national labs, non-profits, and local governments are creating quality jobs today and positioning Idaho to play an important role in the new

382

Marine Mammal Protection Act | Open Energy Information  

Open Energy Info (EERE)

Mammal Protection Act Mammal Protection Act Jump to: navigation, search Statute Name Marine Mammal Protection Act Year 1972 Url [[File:|160px|link=]] Description References NOAA Overview[1] The Marine Mammal Protection Act (MMPA) was enacted on October 21, 1972. All marine mammals are protected under the MMPA. The MMPA prohibits, with certain exceptions, the "take" of marine mammals in U.S. waters and by U.S. citizens on the high seas, and the importation of marine mammals and marine mammal products into the U.S. Congress passed the Marine Mammal Protection Act of 1972 based on the following findings and policies: Some marine mammal species or stocks may be in danger of extinction or depletion as a result of human activities; These species or stocks must not be permitted to fall below their

383

Endangered Species Act | Open Energy Information  

Open Energy Info (EERE)

Endangered Species Act Endangered Species Act Jump to: navigation, search Statute Name Endangered Species Act Year 1973 Url Puerto-rican-parrott-TomMacKenzieUSFWS.jpg Description References The Endangered Species Act[1] Fish and Wildlife Service - ESA Overview[2] ESA Fact Sheet[3] When Congress passed the Endangered Species Act (ESA) in 1973, it recognized that our rich natural heritage is of "esthetic, ecological, educational, recreational, and scientific value to our Nation and its people." It further expressed concern that many of our nation's native plants and animals were in danger of becoming extinct. The purpose of the ESA is to protect and recover imperiled species and the ecosystems upon which they depend. It is administered by the U.S. Fish and Wildlife Service and the Commerce Department's National Marine Fisheries

384

Public Utilities Act (Illinois) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Utilities Act (Illinois) Public Utilities Act (Illinois) Public Utilities Act (Illinois) < Back Eligibility Commercial Industrial Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Program Info State Illinois Program Type Environmental Regulations Generating Facility Rate-Making Safety and Operational Guidelines Provider Illinois Commerce Commission This act aims to make energy services in the state reliable and efficient, while preserving the quality if the environment. It states the duties of public utilities in terms of accounts and reports. Every public utility shall furnish to the Commission all information required by it to carry into effect the provisions of this Act, and shall make specific answers to

385

Final voluntary release assessment/corrective action report  

SciTech Connect

The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.

NONE

1996-11-12T23:59:59.000Z

386

Groundwater Protection Act (Iowa) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Groundwater Protection Act (Iowa) Groundwater Protection Act (Iowa) Groundwater Protection Act (Iowa) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Buying & Making Electricity Home Weatherization Water Alternative Fuel Vehicles Hydrogen & Fuel Cells Program Info State Iowa Program Type Environmental Regulations Provider Iowa Department of Natural Resources The Commissioner of the Iowa Department of Natural Resources is required to

387

Comprehensive Everglades Restoration Plan Regulation Act (Florida) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comprehensive Everglades Restoration Plan Regulation Act (Florida) Comprehensive Everglades Restoration Plan Regulation Act (Florida) Comprehensive Everglades Restoration Plan Regulation Act (Florida) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Multi-Family Residential Municipal/Public Utility Nonprofit Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Florida Program Type Environmental Regulations Siting and Permitting Provider Florida Department of Environmental Protection

388

Massachusetts Endangered Species Act Regulations (Massachusetts) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Endangered Species Act Regulations (Massachusetts) Endangered Species Act Regulations (Massachusetts) Massachusetts Endangered Species Act Regulations (Massachusetts) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Massachusetts Program Type Environmental Regulations Provider Department of Fish and Game

389

Reclamation Act (Nebraska) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reclamation Act (Nebraska) Reclamation Act (Nebraska) Reclamation Act (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Program Info State Nebraska Program Type Siting and Permitting Provider Natural Resources This section establishes Reclamation Districts to conserve, develop, and stabilize supplies of water for domestic, irrigation, power, manufacturing and other beneficial uses. Reclamation Districts are established by

390

Clean Air Act General Conformity Requirements and the National Environmental Policy Act Process (04/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CLEAN AIR ACT CLEAN AIR ACT GENERAL CONFORMITY REQUIREMENTS and the NATIONAL ENVIRONMENTAL POLICY ACT PROCESS N E P A April 2000 U.S. Department of Energy Environment, Safety and Health Office of NEPA Policy and Assistance Clean Air Act General Conformity Requirements and the National Environmental Policy Act Process April 2000 U.S. Department of Energy Environment, Safety and Health Office of NEPA Policy and Assistance printed on recycled paper U.S. Department of Energy, Office of Environment April 2000 Clean Air Act General Conformity Requirements and the National Environmental Policy Act Process Contents 1. BACKGROUND................................ ................................ ................................ .............. 1 1.1 Purpose of the Guidance 1.2 Statutory and Regulatory Framework for Conformity Assurance

391

EM American Recovery and Reinvestment Act Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act Program Recovery Act Program www.em.doe.gov 1 Thomas Johnson, Jr. Recovery Act Program Director PRESENTED TO: Environmental Management Advisory Board (EMAB) December 5, 2011 EM's Mission "Complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons www.em.doe.gov 2 nuclear weapons development, production, and Government- sponsored nuclear energy research." EM's Recovery Act Program $6 Billion at 17 sites (12 states) Accelerated existing scope › Soil and groundwater remediation › Radioactive solid waste disposition › Facility decontamination & decommissioning www.em.doe.gov 3 Selected projects were "shovel-ready" › Fully-defined cost, scope, and schedule › Established regulatory framework › Proven technology

392

Uniform Transboundary Pollution Reciprocal Access Act (Montana) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Uniform Transboundary Pollution Reciprocal Access Act (Montana) Uniform Transboundary Pollution Reciprocal Access Act (Montana) Uniform Transboundary Pollution Reciprocal Access Act (Montana) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Tribal Government Institutional Fuel Distributor Transportation Program Info State Montana Program Type Environmental Regulations This Act allows any entity in a Reciprocating Jurisdiction harmed by pollution originating in the state of Montana to bring an action or other proceeding against the source of that pollution in the state of Montana. Such an entity has the same rights in the state of Montana as they would if

393

Recovery Act Reports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 22, 2012 February 22, 2012 Audit Report: OAS-RA-12-06 The Management of Post-Recovery Act Workforce Transition at Office of Environmental Management Sites February 9, 2012 Inspection Report: INS-RA-12-01 Alleged Misuse of American Recovery and Reinvestment Act Grant Funds by the Western Arizona Council of Governments January 26, 2012 Audit Report: OAS-RA-L-12-03 The Department of Energy's American Recovery and Reinvestment Act - Arizona State Energy Program January 20, 2012 Examination Report: OAS-RA-12-05 Saratoga County Economic Opportunity Council, Inc. -Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment Act of 2009 January 20, 2012 Audit Report: OAS-RA-12-04 The Department's Management of the Smart Grid Investment Grant Program

394

Archaeological Resource Protection Act | Open Energy Information  

Open Energy Info (EERE)

Resource Protection Act Resource Protection Act Year 1979 Url [[File:|160px|link=]] Description Pub.L. 96-95 as amended, 93 Stat. 721, codified at 16 U.S.C. §§ 470aa-470mm References National Park Service ARPA Information[1] The Archaeological Resources Protection Act of 1979, also referred to as ARPA, is a federal law of the United States passed in 1979 and amended in 1988. It governs the excavation of archaeological sites on federal and Indian lands in the United States, and the removal and disposition of archaeological collections from those sites and is administered by the National Park Service. References ↑ "National Park Service ARPA Information" Retrieved from "http://en.openei.org/w/index.php?title=Archaeological_Resource_Protection_Act&oldid=44856

395

Federal Power Act | Open Energy Information  

Open Energy Info (EERE)

Federal Power Act Federal Power Act Year 1920 Url [[File:|160px|link=http://www.fws.gov/laws/lawsdigest/FEDPOWR.HTML]] Description References Federal Power Act[1] The original Federal Power Act provides for cooperation between the Federal Energy Regulatory Commission (Commission) and other Federal agencies, including resource agencies, in licensing and relicensing power projects. The President is required to appoint the five commissioners with the advice and consent of the Senate (16 U.S.C. 792). The President is also authorized, at the request of the Commission, to detail engineers from the Departments of Agriculture or Interior for field work (16 U.S.C. 793). "Navigable waters" (for which the Commission has jurisdiction under the Commerce Clause) are defined to include "streams or other bodies of water

396

National Environmental Policy Act | Open Energy Information  

Open Energy Info (EERE)

Policy Act Policy Act Jump to: navigation, search Statute Name National Environmental Policy Act Year 1969 Url NEPA.jpg Description Enacted in 1970, NEPA established a national policy to encourage productive and enjoyable harmony between man and his environment and to promote the prevention and elimination of damage to the environment and biosphere. References NEPA (statute)[1] NEPA.gov[2] NEPA documents related to geothermal energy[3] The National Environmental Policy Act (NEPA) (42 U.S.C. § 4321 et seq.) - Enacted in 1970, NEPA established a national policy to encourage productive and enjoyable harmony between man and his environment and to promote the prevention and elimination of damage to the environment and biosphere. NEPA requires that all federal agencies consider the potential environmental

397

NETL: Contact Info and Privacy Act Advisory  

NLE Websites -- All DOE Office Websites (Extended Search)

Contact Info and Privacy Act Advisory To contact us: National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236-0940 Phone: 412-386-6167 PRIVACY ACT ADVISORY: Authority: 5 U.S.C. 301, 5 U.S.C. 552, Freedom of Information Act (FOIA); and Title 10, Code of Federal Regulations, Part 1004. Purpose: To allow individuals to file electronic FOIA requests; to track all FOIA requests from receipt to response to compile statistics for the Annual FOIA Report; to research and respond to FOIA requests; to maintain case files to comply with records disposal requirements; and to maintain an administrative record to support any litigation. Routine Use: Records related to the FOIA request will be maintained in DOE-55 "Freedom of Information and Privacy Act (FOIA/PA) Requests for Records." A record

398

American Recovery & Reinvestment Act Newsletter - Issue 28  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

by the 1.6 billion the Rich- land Operations Office received from the Recovery Act. The funding has led to a significant reduction in the Han- ford Site footprint and accelerated...

399

LANL exceeds Early Recovery Act recycling goals  

NLE Websites -- All DOE Office Websites (Extended Search)

LANL exceeds Early Recovery Act recycling goals LANL exceeds Early Recovery Act recycling goals LANL exceeds Early Recovery Act recycling goals Lab demolition projects under the American Recovery and Reinvestment Act have recovered more than 136 tons of recyclable metal since work began last year. March 8, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

400

Archaeological Resources Protection Act | Open Energy Information  

Open Energy Info (EERE)

Resources Protection Act Resources Protection Act Year 1979 Url [[File:|160px|link=http://www.nps.gov/archeology/tools/Laws/arpa.htm]] Description 16 U.S.C. 470aa-470mm; Public Law 96-95 and amendments References National Park Service ARPA Information[1] The Archaeological Resources Protection Act of 1979, also referred to as ARPA, is a federal law of the United States passed in 1979 and amended in 1988. It governs the excavation of archaeological sites on federal and Indian lands in the United States, and the removal and disposition of archaeological collections from those sites and is administered by the National Park Service. 16 USC 470aa-470mm - Statute Text 43 CFR 7 - Regulation Text References ↑ "National Park Service ARPA Information" Retrieved from "http://en.openei.org/w/index.php?title=Archaeological_Resources_Protection_Act&oldid=44853

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Radiation Management Act (Oklahoma) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Radiation Management Act (Oklahoma) Radiation Management Act (Oklahoma) Radiation Management Act (Oklahoma) < Back Eligibility Utility Investor-Owned Utility Program Info State Oklahoma Program Type Environmental Regulations Provider Oklahoma Department of Environmental Quality This Act establishes The Department of Environmental Quality as the designated official agency of the State of Oklahoma for all regulatory activities for the use of atomic energy and sources of radiation, except for the use of sources of radiation by diagnostic x-ray facilities. It also states rules for permits and fees related to the establishment of standards for safe levels of protection against radiation; the maintenance and submission of records; the determination, prevention and control of radiation hazards; the reporting of radiation accidents; the handling,

402

The Federal Advisory Committee Act of 1972  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advisory Committee Act of 1972 Advisory Committee Act of 1972 The Federal Advisory Committee Act (FACA) of 1972 (Public Law 92-463) was enacted by Congress to formally recognize the merits of seeking the advice and assistance of our nation's citizens. Congress sought to assure that advisory committees would provide advice that is relevant, objective, and open to the public. In addition, Congress sought that advisory committees would act promptly to complete their work and comply with reasonable cost controls and recordkeeping requirements. Frequently Asked Questions What is a Federal Advisory Committee? An advisory committee is any committee, board, commission, council, conference, panel, task force, or other similar group which is -- established by statute or reorganization plan; established

403

LANL sponsors Recovery Act Job Fair  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act Job Fair Recovery Act Job Fair LANL sponsors Recovery Act Job Fair The fair was aimed at filling current and future positions with subcontractors working on environmental cleanup under the American Recovery and Reinvestment Act. October 30, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

404

Massachusetts Hazardous Waste Facility Siting Act (Massachusetts) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Massachusetts Hazardous Waste Facility Siting Act (Massachusetts) Massachusetts Hazardous Waste Facility Siting Act (Massachusetts) Massachusetts Hazardous Waste Facility Siting Act (Massachusetts) < Back Eligibility Commercial Fed. Government Fuel Distributor Industrial Institutional Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Program Info State Massachusetts Program Type Siting and Permitting Provider Department of Environmental Protection This Act establishes the means by which developers of proposed hazardous waste facilities will work with the community in which they wish to construct a facility. When the intent to construct, maintain, and/or operate a hazardous waste facility in a city or town is demonstrated, a local assessment committee will be established by that community. The

405

Environmental Protection Act (Illinois) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Protection Act (Illinois) Environmental Protection Act (Illinois) Environmental Protection Act (Illinois) < Back Eligibility Agricultural Commercial Construction Industrial Utility Savings Category Home Weatherization Water Buying & Making Electricity Program Info State Illinois Program Type Environmental Regulations Provider Illinois Pollution Control Board This Act states general provisions for the protection of the environment. It also states specific regulations for air, water and land pollution as well as atomic radiation, toxic chemical and oil spill reporting; along with penalties and permit requirements for several processes. No person shall cause or threaten or allow the discharge or emission of any contaminant into the environment or construct, install, or operate any equipment, facility, vehicle, vessel, or aircraft capable of causing or

406

Wind Energy Act (Maine) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wind Energy Act (Maine) Wind Energy Act (Maine) Wind Energy Act (Maine) < Back Eligibility Developer Utility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Savings Category Wind Buying & Making Electricity Program Info State Maine Program Type Solar/Wind Access Policy Siting and Permitting The Maine Wind Energy Act is a summary of legislative findings that indicate the state's strong interest in promoting the development of wind energy and establish the state's desire to ease the regulatory process for

407

OE Recovery Act News | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Recovery Act News OE Recovery Act News RSS April 17, 2012 ARRA Program Celebrates Milestone 600,000 Smart Meter Installations On April 11, 2012, DOE Recovery Act funding recipient Sacramento Municipal Utility District (SMUD) celebrated a major milestone in the development of a regional smart grid in California: the installation of over 600,000 smart meters. February 15, 2011 Department of Energy Finalizes Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest Nevada Project Expected to Create Over 400 Jobs and Improve Grid Reliability September 16, 2009 Department of Energy Announces Start of Western Area Power Administration Recovery Act Project New transmission line to help move renewable energy resources to market May 18, 2009 Locke, Chu Announce Significant Steps in Smart Grid Development

408

Nuclear Waste Policy Act.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Civilian Radioactive Civilian Radioactive Waste Management Washington, D.C. 20585 March 2004 i THE NUCLEAR WASTE POLICY ACT OF 1982 1 An Act to provide for the development of repositories for the disposal of high-level radioactive waste and spent nuclear fuel, to establish a program of research, development, and demonstration regarding the disposal of high-level radioactive waste and spent nuclear fuel, and for other purposes. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, SHORT TITLE AND TABLE OF CONTENTS Section 1. This Act may be cited as the "Nuclear Waste Policy Act of 1982". Sec. 1. Short title and table of contents...........................................................................i

409

Recovery Act Reports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 19, 2013 February 19, 2013 Examination Report: OAS-RA-13-09 North Carolina State Energy Office - Energy Efficiency and Conservation Block Grant Program Funds Provided by the American Recovery and Reinvestment Act of 2009 February 8, 2013 Special Report: OAS-RA-13-10 The Department of Energy's Management of the Award of a $150 Million Recovery Act Grant to LG Chem Michigan Inc January 17, 2013 Audit Report: OAS-RA-13-07 The Department of Energy's Weatherization Assistance Program Funded under the American Recovery and Reinvestment Act for the State of Maryland January 17, 2013 Examination Report: OAS-RA-13-06 Montgomery County Department of Housing and Community Affairs - Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment Act of 2009

410

High Voltage Safety Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

High Voltage Safety Act High Voltage Safety Act High Voltage Safety Act < Back Eligibility Commercial Construction Developer General Public/Consumer Industrial Installer/Contractor Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Georgia Program Type Safety and Operational Guidelines Siting and Permitting The purpose of the High Voltage Safety Act is to prevent injury to persons and property and interruptions of utility service resulting from accidental or inadvertent contact with high-voltage electric lines by providing that no work shall be done in the vicinity of such lines unless and until the owner or operator thereof has been notified of such work and has taken the appropriate safety measures. The Georgia Public Service Commission requires

411

Nongame and Endangered Species Conservation Act (Nebraska)  

Energy.gov (U.S. Department of Energy (DOE))

The Game and Parks Commission is responsible for implementing and promulgating regulations to protect species named in the Endangered Species Act, as well as other endangered or threatened species...

412

Recovery Act Milestones | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Kill-a-Watt Competition at University of Central Florida Faces of the Recovery Act: Sun Catalytix Investing in Clean, Safe Nuclear Energy Secretary Chu Speaks at the 2010...

413

Critical Areas Act of 1973 (Minnesota)  

Energy.gov (U.S. Department of Energy (DOE))

This Act applies to certain areas of the state with important historic, cultural, or esthetic values, or natural systems with functions of greater than local significance. Plans for a given...

414

Solid Waste Management Services Act (Connecticut)  

Energy.gov (U.S. Department of Energy (DOE))

This Act affirms the commitment of the state government to the development of systems and facilities and technology necessary to initiate large-scale processing of solid wastes and resource...

415

Massachusetts Hazardous Waste Management Act (Massachusetts)  

Energy.gov (U.S. Department of Energy (DOE))

This Act contains regulations for safe disposal of hazardous waste, and establishes that a valid license is required to collect, transport, store, treat, use, or dispose of hazardous waste. Short...

416

Local Solid Waste Disposal Act (Illinois)  

Energy.gov (U.S. Department of Energy (DOE))

It is the purpose of this Act and the policy of this State to protect the public health and welfare and the quality of the environment by providing local governments with the ability to properly...

417

Pennsylvania Solid Waste- Resource Recovery Development Act  

Energy.gov (U.S. Department of Energy (DOE))

This act promotes the construction and the application of solid waste disposal/processing and resource recovery systems that preserve and enhance the quality of air, water, and land resources. The...

418

Solid Waste Resource Recovery Financing Act (Texas)  

Energy.gov (U.S. Department of Energy (DOE))

The State of Texas encourages the processing of solid waste for the purpose of extracting, converting to energy, or otherwise separating and preparing solid waste for reuse. This Act provides for...

419

Carbon Dioxide Transportation and Sequestration Act (Illinois)  

Energy.gov (U.S. Department of Energy (DOE))

This Act applies to the application process for the issuance of a certificate of authority by an owner or operator of a pipeline designed, constructed, and operated to transport and to sequester...

420

Solid Waste Planning and Recycling Act (Illinois)  

Energy.gov (U.S. Department of Energy (DOE))

It is the purpose of this Act to provide incentives for decreased generation of municipal waste, to require certain counties to develop comprehensive waste management plans that place substantial...

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Privacy Act Requests | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

to make a request Requests for records pursuant to the Act can be submitted to the NNSA Albuquerque Complex in writing at the following address: NNSA Albuquerque Complex Office...

422

recovery act | OpenEI Community  

Open Energy Info (EERE)

recovery act Home Graham7781's picture Submitted by Graham7781(1992) Super contributor 15 August, 2013 - 10:09 DOE Report Describes Progress in the Deployment of Synchrophasor...

423

Mr. J . Kieling, Acting Chief Ha  

NLE Websites -- All DOE Office Websites (Extended Search)

Mr. J . Kieling, Acting Chief Ha zardous Waste Bureau Department of Energy Carlsbad Field Office P. O. Box 3090 Carlsbad , New Mexico 88221 DEC 1 6 2011 New Mexico Environment...

424

Flint River Drought Protection Act (Georgia)  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of the Flint River Drought Protection Act is to maintain in-stream flow in times of drought by providing incentives for farmers to take acres out of irrigation. It allows Environmental...

425

Recovery Act Milestones | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A New Biofuels Technology Blooms in Iowa Faces of the Recovery Act: 1366 Technologies Home Energy Assessments The Kill-a-Watt Competition at University of Central Florida Faces of...

426

Flathead Basin Commission Act of 1983 (Montana)  

Energy.gov (U.S. Department of Energy (DOE))

This Act establishes the Flathead Basin Commission, the purpose of which is to protect the Flathead Lake aquatic environment, its waters, and surrounding lands and natural resources. The Commission...

427

Recovery Act SGDP | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Act SGDP View a Map Showing Energy Storage Projects by State Read more View a Map Showing Smart Grid Energy Demonstration Projects by State Read more View a map which combines the...

428

Fuel Cell Technologies Office: Recovery Act  

NLE Websites -- All DOE Office Websites (Extended Search)

Act Act Pie chart diagram shows the breakdown of how cost-sharing funds related to the American Recovery and Reinvestment Act from industry participants, totaling $54 million (for a grand total of $96 million), are allocated within the Fuel Cell Technologies Office, updated September 2010. The diagram shows that $18.5 million is allocated to backup power, $9.7 million is allocated to lift truck, $7.6 million is allocated to portable power, $3.4 million is allocated to residential and commercial CHP, and $2.4 million is allocated to auxiliary power research. The American Recovery and Reinvestment Act of 2009 (Recovery Act) presents opportunities with potential for hydrogen and fuel cell technologies. Signed into law by President Obama on February 17, 2009, the Recovery Act is an unprecedented effort to jumpstart our economy, create or save millions of jobs, and put a down payment on addressing long-neglected challenges so our country can thrive in the twenty-first century.

429

Energy Policy Act (EPAct) of 2005  

NLE Websites -- All DOE Office Websites (Extended Search)

14-DEC-2004 14-DEC-2004 09:45 Sep 08, 2005 Jkt 039139 PO 00058 Frm 00001 Fmt 6579 Sfmt 6579 E:\PUBLAW\PUBL058.109 APPS10 PsN: PUBL058 PUBLIC LAW 109-58-AUG. 8, 2005 ENERGY POLICY ACT OF 2005 VerDate 14-DEC-2004 09:31 Sep 08, 2005 Jkt 039139 PO 00058 Frm 00002 Fmt 6580 Sfmt 6582 E:\PUBLAW\PUBL058.109 APPS10 PsN: PUBL058 119 STAT. 594 PUBLIC LAW 109-58-AUG. 8, 2005 Aug. 8, 2005 [H.R. 6] Energy Policy Act of 2005. 42 USC 15801 note. Public Law 109-58 109th Congress An Act To ensure jobs for our future with secure, affordable, and reliable energy. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, SECTION 1. SHORT TITLE; TABLE OF CONTENTS. (a) SHORT TITLE.-This Act may be cited as the ''Energy Policy Act of 2005''. (b) TABLE OF CONTENTS.-The table of contents for this Act

430

Energy Policy Act (EPAct) of 2005  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-DEC-2004 4-DEC-2004 09:45 Sep 08, 2005 Jkt 039139 PO 00058 Frm 00001 Fmt 6579 Sfmt 6579 E:\PUBLAW\PUBL058.109 APPS10 PsN: PUBL058 PUBLIC LAW 109-58-AUG. 8, 2005 ENERGY POLICY ACT OF 2005 VerDate 14-DEC-2004 09:31 Sep 08, 2005 Jkt 039139 PO 00058 Frm 00002 Fmt 6580 Sfmt 6582 E:\PUBLAW\PUBL058.109 APPS10 PsN: PUBL058 119 STAT. 594 PUBLIC LAW 109-58-AUG. 8, 2005 Aug. 8, 2005 [H.R. 6] Energy Policy Act of 2005. 42 USC 15801 note. Public Law 109-58 109th Congress An Act To ensure jobs for our future with secure, affordable, and reliable energy. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, SECTION 1. SHORT TITLE; TABLE OF CONTENTS. (a) SHORT TITLE.-This Act may be cited as the ''Energy Policy Act of 2005''. (b) TABLE OF CONTENTS.-The table of contents for this Act

431

Federal Energy Management Program: Energy Independence & Security Act  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Energy Independence & Security Act to someone by E-mail Share Federal Energy Management Program: Energy Independence & Security Act on Facebook Tweet about Federal Energy Management Program: Energy Independence & Security Act on Twitter Bookmark Federal Energy Management Program: Energy Independence & Security Act on Google Bookmark Federal Energy Management Program: Energy Independence & Security Act on Delicious Rank Federal Energy Management Program: Energy Independence & Security Act on Digg Find More places to share Federal Energy Management Program: Energy Independence & Security Act on AddThis.com... Requirements by Subject Requirements by Regulation National Energy Conservation Policy Act Executive Order 13514 Energy Independence & Security Act

432

The Nuclear Waste Policy Act, as amended, with appropriations acts appended. Revision 1  

SciTech Connect

This act provides for the development of repositories for the disposal of high-level radioactive wastes, low-level radioactive wastes, and spent nuclear fuels. In addition, it establishes research and development programs, as well as demonstration programs regarding the disposal of these wastes. This Act consists of the Act of Jan. 7, 1983 (Public Law 97-425; 96 Stat. 2201), as amended by Public Law 100-203 and Public Law 102-486.

NONE

1995-02-01T23:59:59.000Z

433

Farmland Protection Policy Act | Open Energy Information  

Open Energy Info (EERE)

Farmland Protection Policy Act Farmland Protection Policy Act Jump to: navigation, search Statute Name Farmland Protection Policy Act Year 1981 Url [[File:|160px|link=http://www.nrcs.usda.gov/wps/portal/nrcs/detail/?ss=16&navtype=SUBNAVIGATION&cid=nrcs143_008275&navid=100170180000000&pnavid=100000000000000&position=Welcome.Html&ttype=detail&pname=Farmland%20Protection%20Policy%20Act%20%7C%20NRCS]] Description Congress enacted the Farmland Protection Policy Act (FPPA) as a subtitle of the 1981 Farm Bill. The purpose of the law is to "...minimize the extent to which Federal programs contribute to the unnecessary conversion of farmland to nonagricultural uses..." (P.L. 97-98, Sec. 1539-1549; 7 U.S.C. 4201, et seq.). The FPPA also stipulates that federal programs be compatible with state, local and private efforts to protect farmland. For the purposes of the law, federal programs include construction projects-such as highways, airports, dams and federal buildings-sponsored or financed in whole or part by the federal government, and the management of federal lands. The U.S. Department of Agriculture's Natural Resources Conservation Service (NRCS) is charged with oversight of the FPPA.

434

Comprehensive Environmental Response, Compensation and Recovery Act  

NLE Websites -- All DOE Office Websites (Extended Search)

Comprehensive Environmental Response, Compensation and Recovery Act (CERCLA) Comprehensive Environmental Response, Compensation and Recovery Act (CERCLA) Congress passed the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, also known as "Superfund") in response to a growing national concern about the release of hazardous substances from abandoned waste sites. Under CERCLA Congress gave the federal government broad authority to regulate hazardous substances, to respond to hazardous substance emergencies, and to develop long-term solutions for the Nation's most serious hazardous waste problems. CERCLA also created a Hazardous Substance Response Trust Fund, supported by an excise tax on feedstock chemicals and petroleum, to pay for cleanup activities at abandoned waste sites. In 1986 CERCLA was reauthorized and amended by the Superfund Amendments and Reauthorization Act (SARA). SARA expanded the federal government's response authorities and clarified that federal facilities are subject to the same CERCLA requirements as private industry. The Community Environmental Response Facilitation Act of 1992 amended the CERCLA provisions dealing with federal activities on any real property owned by the government. It requires the federal government to identify those parts of that real property where no hazardous substance had been stored, released, or disposed of.

435

Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) -List of Covered Electric Utilities - 2006 Public Utility Regulatory Policies Act of 1978...

436

Energy Policy Act of 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Policy Act of 2005 Energy Policy Act of 2005 The U.S. Senate resolved on June 28, 2005 that the bill from the House of Representatives (H.R. 6) entitled ''An Act to ensure...

437

The Jones Act : an economic and political evaluation  

E-Print Network (OSTI)

On June 5, 1920, the Merchant Marine Act of 1920, also known as the Jones Act, became law. The Jones Act, a cabotage law, restricts American waterborne domestic trade to vessels flagged in the United States, owned by ...

Smith, Richard A. (Richard Allen), 1981-

2004-01-01T23:59:59.000Z

438

Public comment re Price-Anderson Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

comment re Price-Anderson Act Public comment re Price-Anderson Act Comments on Notice of Inquiry Concerning Preparation of Report to Congress on the Price-Anderson Act. TRW...

439

Public Comment re Price-Anderson Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Price-Anderson Act Public Comment re Price-Anderson Act Department of Energy (DOE) Price-Anderson Act Comments from White Pine County, Nevada. The views of many "Affected Units of...

440

Recovery Act Reports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 21, 2010 September 21, 2010 Audit Report: OAS-RA-10-17 Status Report: The Department of Energy's State Energy Program Formula Grants Awarded under the American Recovery and Reinvestment Act September 15, 2010 Audit Letter Report: OAS-RA-L-10-06 The Department of Energy's American Recovery and Reinvestment Act- Georgia State Energy Program August 27, 2010 Audit Letter Report: OAS-RA-L-10-09 Office of Science's Energy Frontier Research Centers August 12, 2010 Audit Letter Report: OAS-RA-L-10-05 Decommissioning and Demolition Activities at Office of Science Sites August 11, 2010 Audit Report: OAS-RA-10-16 The Department of Energy's Implementation of the Energy Efficiency and Conservation Block Grant Program under the Recovery and Reinvestment Act: A Status Report August 4, 2010

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Recovery Act Workforce Development | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Act Workforce Act Workforce Development Recovery Act Workforce Development Map of Smart Grid Workforce Development 19 Awards Read more Map of Workforce Development Programs for the Electric Power Sector 33 Awards Read more View the full list of selected projects U.S. Secretary of Energy Steven Chu announced that the Department of Energy announced award selections for nearly $100 million for 54 smart grid workforce development programs that will help prepare the next generation of workers in the utility and electrical manufacturing industries. These projects will leverage more than $95 million in funding from community colleges, universities, utilities and manufacturers to develop and implement training programs. The selectees estimate that the programs will train approximately 30,000 Americans. These workers will help to modernize

442

Geothermal Resources Act (Texas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Geothermal Resources Act (Texas) Geothermal Resources Act (Texas) Geothermal Resources Act (Texas) < Back Eligibility Utility Fed. Government Commercial Investor-Owned Utility Industrial Construction Municipal/Public Utility Local Government Rural Electric Cooperative Tribal Government Savings Category Buying & Making Electricity Program Info State Texas Program Type Siting and Permitting Provider Railroad Commission of Texas The policy of the state of Texas is to encourage the rapid and orderly development of geothermal energy and associated resources. The primary consideration of the development process is to provide a dependable supply of energy in an efficient manner that avoids waste of the energy resources. Secondary considerations will be afforded to the protection of the environment, the protection of correlative rights, and the conservation of

443

Gas Storage Act (Illinois) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Gas Storage Act (Illinois) Gas Storage Act (Illinois) Gas Storage Act (Illinois) < Back Eligibility Agricultural Commercial Developer Fuel Distributor Industrial Utility Program Info State Illinois Program Type Environmental Regulations Safety and Operational Guidelines Siting and Permitting Provider Illinois Commerce Commission Any corporation which is engaged in or desires to engage in, the distribution, transportation or storage of natural gas or manufactured gas, which gas, in whole or in part, is intended for ultimate distribution to the public in the State of Illinois, if the said business of such corporation is regulated or subject to regulation under either the laws of the State of Illinois or the laws of the United States, shall have the right to enter upon, take or damage private property or any interest

444

OE Recovery Act News | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

News News OE Recovery Act News RSS December 18, 2013 BPA Wins Platts Global Energy Award for Grid Optimization Platts awarded the Bonneville Power Administration (BPA) a Global Energy Award for grid optimization on December 12 in New York City for its development of a synchrophasor network. BPA is part of the Recovery Act-funded Western Interconnection Synchrophasor Program. October 21, 2013 SGIG Program Progress Report II Now Available The Smart Grid Investment Grant (SGIG) Program Progress Report II, which updates the SGIG Progress Report published in July 2012, is now available for downloading. August 15, 2013 Report on Synchrophasor Technologies and Their Deployment in Recovery Act Projects Now Available The Office of Electricity Delivery and Energy Reliability has released a

445

WIPP - Freedom of Information Act (FOIA) definition  

NLE Websites -- All DOE Office Websites (Extended Search)

What is the Freedom of Information Act (FOIA)? What is the Freedom of Information Act (FOIA)? The FOIA, Title 5, United States Code, Section 552, was signed into law on July 4, 1966, by President Lyndon B. Johnson. Since then, the FOIA has been amended in 1974, 1986, and most recently, with the enactment of the Electronic Freedom of Information Act Amendments of 1996 (E-FOIA). The E-FOIA and requires federal agencies to make records available both electronically and through public reading rooms. The U.S. Department of Energy (DOE) implements the FOIA regulation in 10 Code of Federal Regulations Part 1004 (10 CFR 1004). The FOIA establishes the premise that any person has a right of access to federal agency records, and that federal agency records must be made available to the public unless they are specifically exempt from public release.

446

Empower Maryland Efficiency Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Empower Maryland Efficiency Act Empower Maryland Efficiency Act Empower Maryland Efficiency Act < Back Eligibility Utility Program Info State Maryland Program Type Energy Efficiency Resource Standard In April 2008 Maryland enacted legislation setting a state goal of achieving a 15% reduction in per capita electricity consumption and 15% reduction in per capita peak demand by 2015, compared to 2007 levels. The legislation requires the Maryland Public Service Commission (PSC) to direct the state's electric utilities to implement programs designed to achieve a 5% reduction in per capita electricity consumption by 2011 and a 10% reduction by 2015. The remainder of the overall goal of 15% is to be accomplished independently through other means. Utility targets for per capita peak demand reduction are set at 5% by 2011, 10% by 2013, and 15% by

447

Environmental Quality Improvement Act of 1970  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QUALITY IMPROVEMENT ACT OF 1970* QUALITY IMPROVEMENT ACT OF 1970* SHORT TITLE This title may be cited as the "Environmental Quality Improvement Act of 1970" Sec. 4371. Congressional findings, declarations, and purposes (a) The Congress finds - (1) that man has caused changes in the environment; (2) that many of these changes may affect the relationship between man and his environment; and (3) that population increases and urban concentration contribute directly to pollution and the degradation of our environment. (b)(1)The Congress declares that there is a national policy for the environment which provides for the enhancement of environmental quality. This policy is evidenced by statutes heretofore enacted relating to the prevention, abatement, and control of environmental pollution, water and land resources, transportation, and economic and

448

OE Recovery Act Blog | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Recovery Act Blog OE Recovery Act Blog RSS September 20, 2013 Electrical transmission lines cross a snow-covered field in Dallas Dam, Oregon. | Energy Department photo. Top 9 Things You Didn't Know About America's Power Grid Ever wonder how electricity gets to your home? Test your knowledge with these top power grid facts. July 11, 2013 Demand Response: Lessons Learned with an Eye to the Future Under the Recovery Act, the Energy Department awarded $3.5 billion in funds to the electricity industry, including OG&E, to help catalyze the adoption of smart grid tools, technologies and techniques such as demand response that are designed to increase the electric grid's flexibility, reliability, efficiency, affordability, and resiliency. Understanding lessons learned from these projects is vital.

449

Lab completes Recovery Act-funded demolition  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act-funded demolition completed Recovery Act-funded demolition completed Lab completes Recovery Act-funded demolition The building was the largest of the 24 demolished at LANL's historic Technical Area 21. January 19, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Contact Fred deSousa Communications Office (505) 665-3430

450

It's Time to ACT | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

It's Time to ACT It's Time to ACT It's Time to ACT May 25, 2011 - 10:32am Addthis John Lippert In my November 29, 2010 and my February 15, 2011 blog postings, I described some tools and strategies based on behavioral psychology that some companies and organizations are using to encourage people to use less energy and purchase clean energy. Here's another one. I was reading an article the other day in which University of Nevada, Reno, psychologist Steven Hayes gave his explanation of why we Americans are so reluctant to adjust our thermostats. He believes our culture has conditioned us to avoid all discomfort. In other words, we believe that we should feel good all the time. The funny thing is that I heard multiple times essentially the same message at religious services I attended. The common thread in these messages and

451

It's Time to ACT | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

It's Time to ACT It's Time to ACT It's Time to ACT May 25, 2011 - 10:32am Addthis John Lippert In my November 29, 2010 and my February 15, 2011 blog postings, I described some tools and strategies based on behavioral psychology that some companies and organizations are using to encourage people to use less energy and purchase clean energy. Here's another one. I was reading an article the other day in which University of Nevada, Reno, psychologist Steven Hayes gave his explanation of why we Americans are so reluctant to adjust our thermostats. He believes our culture has conditioned us to avoid all discomfort. In other words, we believe that we should feel good all the time. The funny thing is that I heard multiple times essentially the same message at religious services I attended. The common thread in these messages and

452

Laboratory awards final Recovery Act demolition contracts  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act demolition contracts Recovery Act demolition contracts Laboratory awards final Recovery Act demolition contracts The two winning bidders will each demolish a portion of the remaining unused buildings at the Lab's historic Technical Area 21. April 20, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

453

ReACT Process Slipstream Testing  

Science Conference Proceedings (OSTI)

The Regenerative Activated Coke Technology (ReACT) process is an integrated emissions control (IEC) technology intended for installation downstream of a particulate control device for control of sulfur oxides (SOx), nitrogen oxides (NOx), mercury (Hg), and particulate matter less than 2.5 microns (PM2.5). This report has been prepared to document the results of a demonstration test for the ReACT process developed by J-POWER Entech, Inc. (JPE) to remove select contaminants from flue gas at coal-fired powe...

2008-11-26T23:59:59.000Z

454

State Assistance for Recovery Act Related Electricity Policies...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assistance for Recovery Act Related Electricity Policies: Awards State Assistance for Recovery Act Related Electricity Policies: Awards List of State Energy Policy Awards under the...

455

RS-NWPA [National Waste Policy Act] | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Policy Act Basalt Waste & Salt River projects RS-NWPA National Waste Policy Act More Documents & Publications OFFICE OF PROCUREMENT & ASSISTANCE MANAGEMENT...

456

Energy Secretary Chu Announces $108 Million in Recovery Act Funding...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08 Million in Recovery Act Funding for Environmental Cleanup in Utah Energy Secretary Chu Announces 108 Million in Recovery Act Funding for Environmental Cleanup in Utah March 31,...

457

Connecticut Recovery Act State Memo | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Connecticut Recovery Act State Memo Connecticut Recovery Act State Memo Connecticut Recovery Act State Memo The American Recovery & Reinvestment Act (ARRA) is making a meaningful downpayment on the nation's energy and environmental future. The Recovery Act investments in Connecticut are supporting abroad range of clean energy projects, from energy efficiency and the smartgrid to alternative fuels and geothermal energy. Through these investments, Connecticut's businesses, universities,non-profits, and local governments are creating quality jobs today and positioning Connecticut to play an important role in the new energy economy of the future. Connecticut Recovery Act State Memo More Documents & Publications California Recovery Act State Memo District of Columbia Recovery Act State Memo

458

Recovery Act: Clean Coal Power Initiative | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clean Coal Power Initiative Recovery Act: Clean Coal Power Initiative A report detailling the Clean Coal Power initiative funded under the American Recovery and Renewal Act of...

459

The Recovery Act is "Lighting Up" the streets of Philadelphia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marketing Administration Other Agencies You are here Home The Recovery Act is "Lighting Up" the streets of Philadelphia The Recovery Act is "Lighting Up" the streets of...

460

New Recovery Act Funding Boosts Industrial Carbon Capture and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act Funding Boosts Industrial Carbon Capture and Storage Research and Development New Recovery Act Funding Boosts Industrial Carbon Capture and Storage Research and...

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Secretary Chu Announces Nearly $50 Million of Recovery Act Funding...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chu Announces Nearly 50 Million of Recovery Act Funding to Accelerate Deployment of Geothermal Heat Pumps Secretary Chu Announces Nearly 50 Million of Recovery Act Funding to...

462

Fossil Energy Acting Assistant Secretary Recognized at Black...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fossil Energy Acting Assistant Secretary Recognized at Black Engineer of the Year Awards Fossil Energy Acting Assistant Secretary Recognized at Black Engineer of the Year Awards...

463

Faces of the Recovery Act: Sun Catalytix | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

White House Science Fair Recap Energy 101: Home Energy Assessment Recovery Act update from Sr. Advisor Matt Rogers -- End of Obligations The Recovery Act is "Lighting Up" the...

464

Montana Ground Water Assessment Act (Montana) | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ground Water Assessment Act (Montana) Montana Ground Water Assessment Act (Montana) Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State...

465

Changes related to "Coal Mine Safety Act (Virginia)" | Open Energy...  

Open Energy Info (EERE)

Special page Share this page on Facebook icon Twitter icon Changes related to "Coal Mine Safety Act (Virginia)" Coal Mine Safety Act (Virginia) Jump to: navigation,...

466

Changes related to "Coal Bed Methane Protection Act (Montana...  

Open Energy Info (EERE)

Special page Share this page on Facebook icon Twitter icon Changes related to "Coal Bed Methane Protection Act (Montana)" Coal Bed Methane Protection Act (Montana)...

467

Pages that link to "Coal Bed Methane Protection Act (Montana...  

Open Energy Info (EERE)

Edit History Share this page on Facebook icon Twitter icon Pages that link to "Coal Bed Methane Protection Act (Montana)" Coal Bed Methane Protection Act (Montana)...

468

Power Plant and Industrial Fuel Use Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Plant and Industrial Fuel Use Act Power Plant and Industrial Fuel Use Act Electricity Advisory Committee Technology Development Electricity Policy Coordination and...

469

American Recovery & Reinvestment Act, ARRA, clean energy projects...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery & Reinvestment Act, ARRA, clean energy projects, energy efficiency, smart grid, alternative fuels, geothermal energy American Recovery & Reinvestment Act, ARRA, clean...

470

Public comment re Price-Anderson Act | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reply comments to notice of inquiry concerning preparation of report to Congress on the Price-Anderson Act Public comment re Price-Anderson Act More Documents & Publications...

471

Audit Report: Department of Energy's Controls over Recovery Act...  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy's Controls over Recovery Act Spending at the Idaho National Laboratory Audit Report: Department of Energy's Controls over Recovery Act Spending at the Idaho...

472

Recovery Act funding accelerates cleanup of Idaho Site, Creates...  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act funding accelerates cleanup of Idaho Site, Creates jobs in community IDAHO FALLS American Recovery and Reinvestment Act (ARRA) funding has accelerated a project...

473

Montana Clean Renewable Energy Bond Act (Montana) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clean Renewable Energy Bond Act (Montana) Montana Clean Renewable Energy Bond Act (Montana) < Back Eligibility StateProvincial Govt Local Government Tribal Government Savings...

474

Information Collection Requests/Paper Reduction Act | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information Collection RequestsPaper Reduction Act Information Collection RequestsPaper Reduction Act Training Presentation on the on Information Collection and the Paper...

475

Recovery Act-Transportation Electrification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Act-Transportation Electrification Recovery Act-Transportation Electrification A report describing the transportation electrification project that will be funded under the FOA,...

476

Water Pollution Control Act (West Virginia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Pollution Control Act (West Virginia) Water Pollution Control Act (West Virginia) Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State...

477

Water Resources Protection and Management Act (West Virginia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resources Protection and Management Act (West Virginia) Water Resources Protection and Management Act (West Virginia) Eligibility Utility Fed. Government Commercial Agricultural...

478

Water Resources Act (Ontario, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Resources Act (Ontario, Canada) Water Resources Act (Ontario, Canada) Eligibility Agricultural Developer Industrial Investor-Owned Utility MunicipalPublic Utility Rural...

479

Map Data: Recovery Act Funding | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Map Data: Recovery Act Funding Map Data: Recovery Act Funding recoveryactfundingnumber.zip More Documents & Publications An Overview of the DOE's Small Business Innovation...

480

Recovery Act, Office of the Biomass Program,Funding Opportunity...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Act, Office of the Biomass Program,Funding Opportunity Announcements Special Notice Recovery Act, Office of the Biomass Program,Funding Opportunity Announcements Special Notice A...

Note: This page contains sample records for the topic "act rfa rcra" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Treasury, Energy Surpass $1 Billion Milestone in Recovery Act...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Treasury, Energy Surpass 1 Billion Milestone in Recovery Act Awards for Clean Energy Projects Treasury, Energy Surpass 1 Billion Milestone in Recovery Act Awards for Clean Energy...

482

The Recovery Act is "Lighting Up" the streets of Philadelphia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Recovery Act is "Lighting Up" the streets of Philadelphia The Recovery Act is "Lighting Up" the streets of Philadelphia Addthis Description The Philadelphia Streets Department...

483

Recovery Act - Solid-State Lighting Core Technologies Funding...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Act - Solid-State Lighting Core Technologies Funding Opportunity Recovery Act - Solid-State Lighting Core Technologies Funding Opportunity A report detailling the Solid State...

484

Solid-State Lighting Recovery Act Award Selections | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solid-State Lighting Recovery Act Award Selections Solid-State Lighting Recovery Act Award Selections A chart highlighting core technology research projects and product development...

485

NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2000 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2000 NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2000 An Act to authorize appropriations for fiscal year 2000 for military activities of the Department of Defense, for...

486

"Recovery Act: Advanced Energy Efficient BuildingTechnologies...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

"Recovery Act: Advanced Energy Efficient BuildingTechnologies" "Recovery Act: Advanced Energy Efficient BuildingTechnologies" Description of a FOA funding oppourtunity with funds...

487

Cumulative Federal Payments to OE Recovery Act Recipients, through...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 31, 2013 Cumulative Federal Payments to OE Recovery Act Recipients, through August 31, 2013 Graph of cumulative Federal Payments to OE Recovery Act Recipients, through...

488

Georgia Nuclear Energy Financing Act (Georgia) | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Energy Financing Act (Georgia) Georgia Nuclear Energy Financing Act (Georgia) Eligibility Investor-Owned Utility MunicipalPublic Utility Rural Electric Cooperative Utility...

489

Secretary Chu Announces Nearly $800 Million from Recovery Act...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

800 Million from Recovery Act to Accelerate Biofuels Research and Commercialization Secretary Chu Announces Nearly 800 Million from Recovery Act to Accelerate Biofuels Research...

490

Energy Policy Act Transportation Rate Study: Interim Report on ...  

U.S. Energy Information Administration (EIA)

ii Energy Information Administration/ Energy Policy Act Transportation Rate Study: Interim Report on Coal Transportation Contacts This report, Energy Policy Act ...

491

Davis Bacon Act Applicability to Smart Grid Investment Grant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Davis Bacon Act Applicability to Smart Grid Investment Grant (SGIG) Program Grants Davis Bacon Act Applicability to Smart Grid Investment Grant (SGIG) Program Grants Letter to...

492

Recovery Act Recipient Reporting on FederalReporting.gov | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on Recovery Act recipient reporting on FederalReporting.gov for Smart Grid Investment Grant recipients Recovery Act Recipient Reporting on FederalReporting.gov More...

493

Recovery Act Investment Moves EM Past Milestone of 100 Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act Investment Moves EM Past Milestone of 100 Project Completions Recovery Act Investment Moves EM Past Milestone of 100 Project Completions The Office of Environmental...

494

Recovery Act - Geothermal Technologies Program:Ground Source...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act - Geothermal Technologies Program:Ground Source Heat Pumps Recovery Act - Geothermal Technologies Program:Ground Source Heat Pumps A detailled description of the...

495

Guidance_Application_Federal_Vacancies_Reform_Act_1998.pdf |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

nceApplicationFederalVacanciesReformAct1998.pdf More Documents & Publications Intelligence Reform and Terroroism Prevention Act - December 17, 2004 Bond Amendment, Security...

496

Economic Impact of Recovery Act Investments in the Smart Grid...  

NLE Websites -- All DOE Office Websites (Extended Search)

Economic Impact of Recovery Act Investments in the Smart Grid Report (April 2013) Economic Impact of Recovery Act Investments in the Smart Grid Report (April 2013) The Economic...

497

Colorado Water Quality Control Act | Open Energy Information  

Open Energy Info (EERE)

Water Quality Control Act Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material: Colorado Water Quality Control Act edit Details Activities (0) Areas...

498

Workers at Hanford Site Achieve Recovery Act Legacy Cleanup Goals...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

at Hanford Site Achieve Recovery Act Legacy Cleanup Goals Ahead of Schedule Workers at Hanford Site Achieve Recovery Act Legacy Cleanup Goals Ahead of Schedule The Hanford Site...

499

Hanford's Recovery Act Payments Jump Past $1 Billion | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Richland Operations Office's (RL) American Recovery and Reinvestment Act payments at Hanford recently surpassed 1 billion. RL was allocated 1.63 billion from the Recovery Act...

500

Mississippi Recovery Act State Memo | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here Home Mississippi Recovery Act State Memo Mississippi Recovery Act State Memo Mississippi has substantial natural resources, including biomass, oil, coal,...