  1. Notice of Availability (NOA) for the Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New England Clean Power Link (NECPL) Transmission Line: Federal Register Notice, Volume 80, No. 113 - Jun. 12, 2015 Notice of Availability (NOA) for the Draft Environmental Impact ...

  2. Notices of Availability (NOA) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    that announces the issuance and public availability of a draft or final EIS. The Environmental Protection Agency NOA is the official public notification of an EIS; a DOE...

  3. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability Oneida Seven Generations Corporation: Energy Recovery Project, Green Bay, Wisconsin November 10, 2011 EIS-0440: DOE and EPA Notice of Availability of a...

  4. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and BLM Notice of Availability of the Final Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States July 26, 2012 EIS-0312: Notice of...

  5. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing Energia Sierra Juarez Transmission Project August 27, 2010 EIS-0455: EPA Notice of...

  6. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2005 EA-1551: Notice of Intent to Prepare an Environmental Assessment EA-1551: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line March 4, 2005 EIS-0342: DOE Notice of...

  7. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line January 11, 2008 EIS-0236-S4: DOE Notice of...

  8. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    31, 1996 EIS-0183: DOE Notice of Availability of the Record of Decision Short-Term Marketing and Operating Arrangements November 1, 1995 EIS-0183: DOE Notice of Availability...

  9. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 11, 2013 EA-1903: Notice of Availability of Draft Environmental Assessment Kansas State University Zond Wind Energy Project, Manhattan, Kansas August 9, 2013 EA-1949:...

  10. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OH April 29, 2011 EIS-0350-S1: EPA Notice of Availability of the Draft Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy...

  11. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Spring Chinook Project May 15, 2003 EIS-0350: DOE Notice of Availability of the Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement...

  12. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico July 6, 2006 EA-1566: DOE Notice of Availability of the Draft Environmental...

  13. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Coos County, OR) and Pacific Connector Pipeline Project (Coos, Klamath, Jackson, and Douglas Counties, OR) November 10, 2014 EIS-0489: FERC Notice of Availability of Draft...

  14. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management (BLM) has prepared a Draft Environmental Impact Statement (EIS) for the San Juan Basin Energy Connect Project (Project) and by this notice is announcing the opening of...

  15. Notices of Availability (NOA) | Department of Energy

    Energy Savers [EERE]

    Golden Pass LNG Export Project; Texas and Louisiana March 23, 2016 EIS-0501: Notice of Availability of Draft Environmental Impact Statement Golden Pass LNG Export Project; Texas ...

  16. Notice of Availability (NOA) for the Draft Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    route, alignment, and site alternatives required for a transmission line route permit from the Minnesota Public Utilities Commission under the Minnesota Power Plant Siting Act. ...

  17. Microsoft Word - Eratta Notice on NOA_no comments for FEA

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Public Utility District No. 1 of Snohomish County, Washington Project No. 12690-005 ERRATA NOTICE (August 9, 2013) On August 9, 2013, the Commission issued notice of availability of the Final Environmental Assessment for the Admiralty Inlet Pilot Tidal Project No. 12690. The notice mistakenly says that comments should be filed within 30 days. The Commission does not solicit comments on a Final Environmental Assessment. Kimberly D. Bose, Secretary

  18. NO FEAR Act Notice | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NO FEAR Act Notice NO FEAR Act Notice The Department of Energy's notice for the No FEAR Act. To learn more about the No FEAR Act, visit this page. No FEAR Act Annual Notice_0.pdf (196.65 KB) More Documents & Publications Policy Statement on Equal Employment Opportunity, Harassment, and Retaliation Diversity and Inclusion Strategic Plan 2012 - 2015 ADR in the Federal EEO Process: What We Need to Know about Revised MD-110 ADR LUNCHTIME PROGRAM: ADR in the Federal EEO Process: What We Need to

  19. DOE Secretarial Notice: National Environmental Policy Act (February...

    Office of Environmental Management (EM)

    Notice: National Environmental Policy Act (February 5, 1990, status: cancelled) DOE Secretarial Notice: National Environmental Policy Act (February 5, 1990, status: cancelled) This...

  20. Cancelled- DOE Secretarial Notice: National Environmental Policy Act (DOE, 1990)

    Broader source: Energy.gov [DOE]

    This Secretarial Notice announced revisions of DOE compliance procedures under the National Environmental Policy Act. This notice has been cancelled and is for historical use only.

  1. Cancelled- DOE Secretarial Notice: National Environmental Policy Act (1990)

    Broader source: Energy.gov [DOE]

    This Secretarial Notice announced revisions of DOE compliance procedures under the National Environmental Policy Act. This notice has been cancelled and is for historical use only.

  2. EA-1900-NOA-DEA-2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Availability of a Draft Environmental Assessment for Construction and Operation of a Radiological Work and Storage Building TITLE: Notice of Availability of a Draft Environmental Assessment for Construction and Operation of a Radiological Work and Storage Building AGENCY: U.S. Department of Energy, Naval Nuclear Propulsion Program ACTION: Notice of Availability of a Draft Environmental Assessment. SUMMARY: Pursuant to the National Environmental Policy Act of 1969, as amended (NEPA) (42

  3. DOE Secretarial Notice: National Environmental Policy Act (February 5, 1990, status: cancelled)

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Secretarial Notice announced revisions of DOE compliance procedures under the National Environmental Policy Act.

  4. EIS-0460: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Illinois PDF icon EIS-0460-DEIS-EPA-NOA-2013.pdf More Documents & Publications EIS-0288-S1: EPA Notice of Availability of Draft Supplemental Environmental Impact Statement...

  5. EIS-0407: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Final Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Kansas PDF icon EIS-0407-NOA-FEIS-2010.pdf More Documents &...

  6. The structure of YqeH: An AtNOS1/AtNOA1 ortholog that couples GTP hydrolysis to molecular recognition

    SciTech Connect (OSTI)

    Sudhamsu, J.; Lee, G.I.; Klessig, D.F.; Crane, B.R.

    2009-03-27

    AtNOS1/AtNOA1 was identified as a nitric oxide-generating enzyme in plants, but that function has recently been questioned. To resolve issues surrounding AtNOA1 activity, we report the biochemical properties and a 2.36 {angstrom} resolution crystal structure of a bacterial AtNOA1 ortholog (YqeH). Geobacillus YqeH fused to a putative AtNOA1 leader peptide complements growth and morphological defects of Atnoa1 mutant plants. YqeH does not synthesize nitric oxide from L-arginine but rather hydrolyzes GTP. The YqeH structure reveals a circularly permuted GTPase domain and an unusual C-terminal {beta}-domain. A small N-terminal domain, disordered in the structure, binds zinc. Structural homology among the C-terminal domain, the RNA-binding regulator TRAP, and the hypoxia factor pVHL define a recognition module for peptides and nucleic acids. TRAP residues important for RNA binding are conserved by the YqeH C-terminal domain, whose positioning is coupled to GTP hydrolysis. YqeH and AtNOA1 probably act as G-proteins that regulate nucleic acid recognition and not as nitric-oxide synthases.

  7. Notices

    National Nuclear Security Administration (NNSA)

    ... PROTECTION AGENCY FRL-9724-6 Clean Water Act: Availability of List Decisions ... SUMMARY: This notice announces EPA's decision to identify certain water quality limited ...

  8. I.C. 27-503 - Protection of Graves, Permitted Acts -- Notice...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: I.C. 27-503 - Protection of Graves, Permitted Acts -- NoticeLegal Abstract This statute...

  9. Privacy Act System Notices | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    System Notices When an agency establishes a new, or makes changes to, an existing system ... 30 days prior to the implementation of the new routine use to allow for public comment

  10. EA-1919: Notice of Availability of a Draft Programmatic Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    comments on the Draft PEA was printed correctly in the Draft PEA but contained an error in the Notice of Availability (NOA) published in the Federal Register on December 12,...

  11. EIS-0419: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    75-megawatt Wind Turbine Facility, City of White Salmon, Skamania County, WA EIS-0419-NOA-DEIS-2010.pdf More Documents & Publications EIS-0456: EPA Notice of Availability of the...

  12. EIS-0459: EPA Notice of Availablity for the Draft Programmatic...

    Broader source: Energy.gov (indexed) [DOE]

    EPA announced the availability of DOE's Hawaii Clean Energy Draft Programmatic EIS. EIS-0459-EPA-NOA-2014.pdf More Documents & Publications EIS-0474: EPA Notice of Availability of...

  13. EA-1809: Notice of Availability | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Earth Nation Wind Energy Project II, Becker and Mahnomen Counties, MN. PDF icon EA-1809-FEA-NOA-2012.pdf More Documents & Publications EA-1809: Notice of Availability of a Draft...

  14. We are providing this notice to you as required by the Affordable Care Act, to i

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    are providing this notice to you as required by the Affordable Care Act, to inform you about the new health exchange options available under the law. Please feel free to compare the coverage available at the exchanges with coverage at Los Alamos National Security, LLC. New Health Insurance Marketplace Coverage Options and Your Health Coverage PART A: General Information When key parts of the health care law take effect in 2014, there will be a new way to buy health insurance: the Health

  15. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    206 Federal Register / Vol. 80, No. 219 / Friday, November 13, 2015 / Notices Authority: 15 U.S.C. 2601 et seq. Dated: November 5, 2015. Pamela Myrick, Acting Director, Information Management Division, Office of Pollution Prevention and Toxics. [FR Doc. 2015-28842 Filed 11-12-15; 8:45 am] BILLING CODE 6560-50-P ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9023-9] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202)

  16. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    64 Federal Register / Vol. 79, No. 247 / Wednesday, December 24, 2014 / Notices SUMMARY: This notice sets forth the schedule and summary agenda for a partially-closed meeting of the President's Council of Advisors on Science and Technology (PCAST), and describes the functions of the Council. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register. DATES: January 9, 2015, 9:00 a.m. to 12:00 p.m. ADDRESSES:

  17. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Federal Register / Vol. 80, No. 224 / Friday, November 20, 2015 / Notices To submit comments, or access the docket, please follow the detailed instructions provided under ADDRESSES in the Federal Register document of September 25, 2015. If you have questions on individual chemicals, consult the person listed in the Table. Authority: 7 U.S.C. 136 et seq. Dated: November 13, 2015. Michael Goodis, Acting Director, Pesticide Re-Evaluation Division, Office of Pesticide Programs. [FR Doc. 2015-29689

  18. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    486 Federal Register / Vol. 77, No. 35 / Wednesday, February 22, 2012 / Notices development and implementation of programs related to onshore unconventional natural gas and other petroleum resources to the Secretary of Energy and provide comments and recommendations and priorities for the Department of Energy Annual Plan per requirements of the Energy Policy Act of 2005, Title IX, Subtitle J, Section 999. Tentative Agenda 10:30 a.m. Registration 11 a.m. Welcome and Roll Call; Opening Remarks by

  19. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    192 Federal Register / Vol. 80, No. 219 / Friday, November 13, 2015 / Notices 1 National Hydropower Asset Assessment Program, Non-Powered Dam Resource Assessment can be found at http://nhaap.ornl.gov/content/non- powered-dam-potential. 2 18 U.S.C. 4, 5, and 16. 3 Section 14 of the Rivers and Harbors Act of 1899 (33 U.S.C. 408). 4 Section 404 of the Clean Water Act (33 U.S.C. 1344). Total Estimated Number of Annual Responses: 22,123. Total Estimated Number of Annual Burden Hours: 7,374. Abstract:

  20. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    257 Federal Register / Vol. 81, No. 24 / Friday, February 5, 2016 / Notices filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Coffeeville Lock and Dam Hydroelectric Project (Coffeeville Project or project) to be located at the U.S. Army Corps of Engineers' Coffeeville Lock and Dam on the Tombigbee River in Clark County, Alabama. The sole purpose of a preliminary permit, if issued, is to grant the

  1. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    17 Federal Register / Vol. 77, No. 38 / Monday, February 27, 2012 / Notices Issued at Washington, DC, on February 21, 2012. LaTanya R. Butler, Acting Deputy Committee Management Officer. [FR Doc. 2012-4461 Filed 2-24-12; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY [OE Docket No. RRTT-IR-001] Rapid Response Team for Transmission AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy, DoE. ACTION: Request for information. SUMMARY: The Department of Energy's

  2. Energy Policy Act of 2005, Section 1813, Draft Report to Congress: Federal Register Notice Volume 71, No. 153- Aug. 9, 2006

    Broader source: Energy.gov [DOE]

    Notice of publication of draft report to Congress: Section 1813 of the Energy Policy Act of 2005 (Pub. L. 109–58) requires the Department of the Interior and the Department of Energy (Departments)...

  3. DOE Extends Comment Period on Notice of Inquiry Under the Energy Independence and Security Act

    Broader source: Energy.gov [DOE]

    Today, in response to a formal request, General Counsel Scott Blake Harris approved a second and final extension of the public comment period to November 30, 2010 on DOE’s Notice of Inquiry (75 FR...

  4. DOE Extends Comment Period on Notice of Inquiry Under the Energy Independence and Security Act

    Broader source: Energy.gov [DOE]

    Today, in response to a formal request, General Counsel Scott Blake Harris approved a 30-day extension of the public comment period on DOE's Notice of Inquiry (75 FR 43945) soliciting comment on...

  5. EIS-0396: Notice of Extension of Time to Submit Scoping Comments |

    Office of Environmental Management (EM)

    Statement | Department of Energy 1: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0391: EPA Notice of Availability of the Draft Environmental Impact Statement Tank Closure and Waste Management for the Hanford Site, Richland, WA EIS-0391-DEA-NOA-2009.pdf (134.82 KB) More Documents & Publications EIS-0387: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0527: EPA Notice of Availability of a Draft Programmatic Environmental Impact

  6. EIS-0487: EPA Notice of Availability of Draft Environmental Impact

    Office of Environmental Management (EM)

    Impact Statement | Department of Energy a Draft Programmatic Environmental Impact Statement EIS-0472: EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado EPA announces the availability of the Draft Programmatic Environmental Impact Statement for the Uranium Leasing Program. EIS-0472-DEIS-EPA-NOA-2013.pdf (193.5 KB) More Documents & Publications EIS-0441: Amended Notice of Availability

  7. EA-1900: Notice of Availability of a Draft Environmental Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 0: Notice of Availability of a Draft Environmental Assessment EA-1900: Notice of Availability of a Draft Environmental Assessment Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site, West Milton, New York DOE announces the availability of the Draft Environmental Assessment for the Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site, West Milton, New York. EA-1900-NOA-DEA-2012 (11.34 KB)

  8. Notices

    Broader source: Energy.gov (indexed) [DOE]

    5 Federal Register Vol. 78, No. 89 Wednesday, May 8, 2013 Notices reporting, please go to www.ed.gov fundgrantapplyappforms appforms.html. 4. Performance Measures: The...

  9. Notices

    Broader source: Energy.gov (indexed) [DOE]

    6 Federal Register Vol. 80, No. 60 Monday, March 30, 2015 Notices 4 The Advisory Council on Historic Preservation's regulations are at Title 36, Code of Federal Regulations,...

  10. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notices 1 The regional reliability organizations under FPA section 215 are the Florida ... should be considered, and what types of analysis should be performed to ...

  11. Notices

    Broader source: Energy.gov (indexed) [DOE]

    Morgan Louisiana Pipeline LLC; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Magnolia LNG and Lake Charles Expansion Projects The staff of the ...

  12. Notices

    Energy Savers [EERE]

    On December 21, 2012, the Notice of Availability of the Final Environmental Impact Statement (EIS) ... Western's Large Generator Interconnection Procedures provide for transmission ...

  13. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    426 Federal Register / Vol. 80, No. 62 / Wednesday, April 1, 2015 / Notices 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of the appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ''eLibrary'' or from the Commission's Public Reference Room, 888 First Street NE., Washington, DC 20426, or call (202) 502-8371. For instructions on connecting to eLibrary, refer to the last page of

  14. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    189 Federal Register / Vol. 80, No. 127 / Thursday, July 2, 2015 / Notices 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of the appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov Continued Dated: June 24, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015-16308 Filed 7-1-15; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. PF15-18-000 and PF15-19-

  15. Notices

    Broader source: Energy.gov (indexed) [DOE]

    ... export LNG both on its own behalf and as agent for other parties who hold title to the ... on DSK5VPTVN1PROD with NOTICES 28257 Federal Register Vol. 80, No. 95 Monday, May ...

  16. Notices

    Broader source: Energy.gov (indexed) [DOE]

    7489 Federal Register Vol. 80, No. 152 Friday, August 7, 2015 Notices Dated: August 3, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. FR Doc. 2015-19420 Filed 8-6-15; 8:45...

  17. Notice

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Louisiana LNG Energy, LLC Docket No. PF14-17-000 SUPPLEMENTAL NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED MISSISSIPPI RIVER LNG PROJECT, AND ...

  18. Notices

    National Nuclear Security Administration (NNSA)

    ... Water consumption would vary, primarily because of the length of the corridor, ranging ... am BILLING CODE 6450-01-P DEPARTMENT OF ENERGY Notice of Intent to Prepare an ...

  19. Notice

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Louisiana LNG Energy, LLC Docket No. PF14-17-000 SUPPLEMENTAL NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED MISSISSIPPI RIVER LNG PROJECT, AND REQUEST FOR COMMENTS ON ENVIRONMENTAL ISSUES RELATED TO PROJECT CHANGES (September 30, 2015) On October 3, 2014, the Federal Energy Regulatory Commission (FERC or Commission) issued in Docket No. PF14-17-000 a Notice of Intent to Prepare an Environmental Impact Statement for the Planned Mississippi River LNG Project and

  20. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Federal Register / Vol. 80, No. 224 / Friday, November 20, 2015 / Notices ACTION: Notice of document availability. SUMMARY: Copies of the Bonneville Purchasing Instructions (BPI), which contain the policy and establish the procedures that BPA uses in the solicitation, award, and administration of its purchases of goods and services, including construction, are available in printed form or at the following Internet address: http://www.bpa.gov/corporate/ business/bpi. Copies of the Bonneville

  1. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    519 Federal Register / Vol. 77, No. 118 / Tuesday, June 19, 2012 / Notices send you a Grant Award Notification (GAN). We may notify you informally, also. If your application is not evaluated or not selected for funding, we notify you. 2. Administrative and National Policy Requirements: We identify administrative and national policy requirements in the application package and reference these and other requirements in the Applicable Regulations section of this notice. We reference the regulations

  2. Notices

    National Nuclear Security Administration (NNSA)

    4222 Federal Register / Vol. 77, No. 145 / Friday, July 27, 2012 / Notices alternatives carried forward for detailed study, is disclosed in Chapter 2 of the Final EIS. 6. Scoping Process: A Notice of Intent to prepare a Draft EIS for the Proposed Point Thomson Project was published in the Federal Register on December 4, 2009. The Corps of Engineers conducted public scoping, Alaska Native Tribal consultations, and resource agency meetings in AK prior to preparing the Draft EIS. Over 300

  3. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Justice). 9. Intentional Destructive Acts, including terrorist acts. 10. Other past, ... Washington, DC 20460. The EPADC Public Reading Room is open from 8 a.m. to 4:30 p.m., ...

  4. Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dated: December 11, 2012. Tomakie Washington, Acting Director, Information Collection Clearance Division, Privacy, Information and Records Management Services, Office of ...

  5. Notices

    Office of Environmental Management (EM)

    for Corporate Performance Management to DoD.'' Meeting Agenda: 12:30 p.m.-1:45 p.m. ... U.S. Navy F-35C West Coast Homebasing AGENCY: Department of the Navy, DoD. ACTION: Notice. ...

  6. Notices

    Office of Environmental Management (EM)

    section 312(n) of the Clean Water Act (''Uniform National Discharge Standards for Vessels of the Armed Forces'' or ''UNDS'') no-discharge zones (''NDZs'') for discharges from...

  7. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Dated: April 14, 2011. Peter Caulkins, Acting Director, Pesticide Re-evaluation ... EIS No. 20110154, Final EIS, NRC, MN, Generic-License Renewal of Nuclear Plants for the ...

  8. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    C. Conaty, Acting Director, Office of English Language Acquisition, Language Enhancement, and Academic Achievement for Limited English Proficient Students. FR Doc. 2013-21639 ...

  9. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Director of the Information Collection Clearance Division, U.S. Department of Education, ... Dated: September 25, 2015. Kate Mullan, Acting Director, Information Collection Clearance ...

  10. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Kate Mullan, Acting Director, Information Collection Clearance Division, Privacy, Information and Records Management Services, Office of Management. FR Doc. 2013-19294 Filed ...

  11. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dated: May 6, 2014. Tomakie Washington, Acting Director, Information Collection Clearance Division, Privacy, Information and Records Management Services, Office of Management. FR ...

  12. Notices

    Broader source: Energy.gov (indexed) [DOE]

    Director of the Information Collection Clearance Division, U.S. Department of Education, ... Dated: November 8, 2013 Kate Mullan, Acting Director, Information Collection Clearance ...

  13. EIS-0472: DOE Notice of Availability of a Draft Programmatic Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0472: DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado DOE announces the availability of a Draft Programmatic Environmental Impact Statement for the Uranium Leasing Program. EIS-0472-DOE-NOA-DEIS-2013.pdf (202.73 KB) More Documents & Publications Uranium

  14. EIS-0472: EPA Notice of Availability of a Draft Programmatic Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0472: EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado EPA announces the availability of the Draft Programmatic Environmental Impact Statement for the Uranium Leasing Program. EIS-0472-DEIS-EPA-NOA-2013.pdf (193.5 KB) More Documents & Publications EIS-0441:

  15. Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    04 Federal Register / Vol. 78, No. 86 / Friday, May 3, 2013 / Notices consistent with its approved application and budget. In making a continuation grant, the Secretary also considers whether the grantee is operating in compliance with the assurances in its approved application, including those applicable to Federal civil rights laws that prohibit discrimination in programs or activities receiving Federal financial assistance from the Department (34 CFR 100.4, 104.5, 106.4, 108.8, and 110.23).

  16. Notices

    Office of Environmental Management (EM)

    294 Federal Register / Vol. 78, No. 184 / Monday, September 23, 2013 / Notices days prior to the meeting and reasonable provision will be made to include the presentation in the agenda. The Deputy Designated Federal Officer is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Individuals wishing to make public comments will be provided a maximum of five minutes to present their comments. Minutes: Minutes will be available by writing or calling

  17. NOTICE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ~ ~ . _ _ _ _ - NOTICE This report was prepared as a n account of work sponsored by the United States Government. Neither the United States nor the United States Energy Research and Development Administration, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness or usefulness of any information, apparatus, product or process disclosed,

  18. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    32 Federal Register / Vol. 79, No. 158 / Friday, August 15, 2014 / Notices (202) 219-3032. The registration deadline is Tuesday, September 2, 2014. Individuals who will need accommodations for a disability in order to attend the hearing (i.e., interpreting services, assistive listening devices, and/or materials in alternative format) should notify the Advisory Committee no later than Tuesday, September 2, 2014 by contacting Ms. Tracy Jones at (202) 219-2099 or via email at

  19. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    07 Federal Register / Vol. 78, No. 93 / Tuesday, May 14, 2013 / Notices Air quality; soils, geology, and mineral resources; ground water; surface water; biological resources; cultural resources; land use; socioeconomics; environmental justice; community services; utility systems; transportation; materials and waste management; human health, safety, and accidents; and noise. Because the proposed project may affect wetlands, the draft EIS includes an assessment of impacts to wetlands in accordance

  20. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Federal Register / Vol. 79, No. 37 / Tuesday, February 25, 2014 / Notices 1 By issuing an ESP, NRC approves one or more sites for a nuclear power facility, independent of the specific nuclear plant design. In reviewing an ESP application, the NRC evaluates site safety issues, environmental protection issues, and plans for coping with emergencies. By issuing a COL, NRC authorizes the licensee to construct and operate (under specified conditions) an approved design for a nuclear power plant at a

  1. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    112 Federal Register / Vol. 79, No. 101 / Tuesday, May 27, 2014 / Notices LNG export application(s) previously approved on domestic natural gas supply and demand fundamentals. DOE may also consider other factors bearing on the public interest, including the impact of the proposed exports on the U.S. economy (including GDP, consumers, and industry), job creation, the U.S. balance of trade, and international considerations; and whether the authorization is consistent with DOE's policy of promoting

  2. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    493 Federal Register / Vol. 79, No. 124 / Friday, June 27, 2014 / Notices DATES: Deadline for Transmittal of Applications: July 15, 2014. FOR FURTHER INFORMATION CONTACT: Christine Miller, U.S. Department of Education, 400 Maryland Avenue SW., Room 4C119, Washington, DC 20202- 5950. Telephone: (202) 453-5680 or by email: tqpartnership@ed.gov. If you use a telecommunications device for the deaf or a text telephone, call, toll free: 1-877-576-7734. SUPPLEMENTARY INFORMATION: All other information

  3. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6793 Federal Register / Vol. 79, No. 154 / Monday, August 11, 2014 / Notices governmental organizations; interested Indian tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission's regulations) who are potential right-of-way grantors, whose property may be used temporarily for Project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the

  4. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    421 Federal Register / Vol. 79, No. 249 / Tuesday, December 30, 2014 / Notices 1 18 CFR 385.2001-2005 (2014). 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ''COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY'' or ''MOTION TO INTERVENE,'' as applicable; (2) state in the heading the name of the applicant and

  5. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    538 Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docs- filing/esubscription.asp. Finally, public meetings or site visits will be posted on the Commission's calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related

  6. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    795 Federal Register / Vol. 80, No. 123 / Friday, June 26, 2015 / Notices approved application and budget; and, if the Secretary has established performance measurement requirements, the performance targets in the grantee's approved application. In making a continuation grant, the Secretary also considers whether the grantee is operating in compliance with the assurances in its approved application, including those applicable to Federal civil rights laws that prohibit discrimination in programs

  7. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1800 Federal Register / Vol. 80, No. 165 / Wednesday, August 26, 2015 / Notices 1 Western's UGP Region has signed a membership agreement with SPP with a target date of transferring the functional control of its facilities in the eastern interconnection to SPP on October 1, 2015. Thereafter interconnection requests would be pursuant to the SPP tariff. Revisions to the SPP tariff incorporate Western's requirement that it will still perform NEPA reviews on interconnections associated with its

  8. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    268 Federal Register / Vol. 80, No. 167 / Friday, August 28, 2015 / Notices filed with the Board either before or after the meeting. Individuals who wish to make oral statements pertaining to agenda items should contact Greg Simonton at the address or telephone number listed above. Requests must be received five days prior to the meeting and reasonable provision will be made to include the presentation in the agenda. The Deputy Designated Federal Officer is empowered to conduct the meeting in a

  9. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    848 Federal Register / Vol. 80, No. 33 / Thursday, February 19, 2015 / Notices collection of information are those materials necessary to allow the agency to determine applicant and community eligibility and an explanation and documentation of the high need for the benefits of the SUTA provisions. Program specific application materials, which funds are being applied for, are covered by the information collection package for the specific RUS program. Estimate of Burden: Public reporting burden

  10. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    37 Federal Register / Vol. 80, No. 243 / Friday, December 18, 2015 / Notices functions and duties of the Chief Financial Officer of the Department of Education. Date: December 11, 2015. Thomas P. Skelly, Delegated to perform the functions and duties of the Chief Financial Officer. [FR Doc. 2015-31900 Filed 12-17-15; 8:45 am] BILLING CODE 4000-01-P DEPARTMENT OF EDUCATION [Docket No.: ED-2015-ICCD-0142] Agency Information Collection Activities; Comment Request; Federal Direct Consolidation Loan

  11. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    42 Federal Register / Vol. 81, No. 88 / Friday, May 6, 2016 / Notices was to complete sales and distribution by March 2016, EPA anticipates that the registrant will not need an existing stocks provision. Persons other than the registrant will generally be allowed to sell, distribute, or use existing stocks until such stocks are exhausted, provided that such sale, distribution, or use is consistent with the terms of the previously approved labeling on, or that accompanied, the cancelled product.

  12. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    61 Federal Register / Vol. 81, No. 107 / Friday, June 3, 2016 / Notices ingestion of formula mixed with contaminated drinking water or breast milk. EPA is considering deriving a perchlorate MCLG by linking BBDR model output to alterations in thyroid hormone status that result in alterations in neurodevelopment. The draft approach for deriving a perchlorate MCLG outlines an assessment of the literature linking alterations in thyroid hormone status to alterations in neurodevelopment. Based on the

  13. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    54 Federal Register / Vol. 81, No. 107 / Friday, June 3, 2016 / Notices Subcommittees will not work independently of the Board and must report all recommendations and advice solely to the Board for full deliberation and discussion. Subcommittees, task forces, or working groups have no authority to make decisions and recommendations, verbally or in writing, on behalf of the Board. No subcommittee or any of its members can update or report, verbally or in writing, directly to the DoD or any

  14. Notices

    Energy Savers [EERE]

    48132 Federal Register / Vol. 79, No. 158 / Friday, August 15, 2014 / Notices (202) 219-3032. The registration deadline is Tuesday, September 2, 2014. Individuals who will need accommodations for a disability in order to attend the hearing (i.e., interpreting services, assistive listening devices, and/or materials in alternative format) should notify the Advisory Committee no later than Tuesday, September 2, 2014 by contacting Ms. Tracy Jones at (202) 219-2099 or via email at

  15. Notices

    National Nuclear Security Administration (NNSA)

    80348 Federal Register / Vol. 80, No. 247 / Thursday, December 24, 2015 / Notices 1 Transuranic (TRU) waste is waste that contains alpha particle-emitting radionuclides with atomic numbers greater than that of uranium (92) and half- lives greater than 20 years in concentrations greater than 100 nanocuries per gram of waste. science, technology, and innovation may bear on the policy choices before the President. PCAST is co-chaired by Dr. John P. Holdren, Assistant to the President for Science

  16. Notices

    National Nuclear Security Administration (NNSA)

    7100 Federal Register / Vol. 76, No. 122 / Friday, June 24, 2011 / Notices CRA requirements. These requirements currently include transfer of data on lender interest benefits and special allowance payments, defaulted loan balances, and supplemental pre-claims assistance payments information. (13) Disclosure in the Course of Responding to Breach of Data. The Department may disclose records from this system to appropriate agencies, entities, and persons when: (a) The Department suspects or has

  17. Notices

    U.S. Energy Information Administration (EIA) Indexed Site

    ... Act of 1982 (42 U.S.C. 10101 et seq.). Issued in Washington, DC, on November 25, 2015. Nanda Srinivasan, Director, Office of Survey Development and Statistical Integration, U.S. ...

  18. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... A. Gabriel, Administrator. FR Doc. 2013-11704 Filed 5-15-13; 8:45 am BILLING CODE 6450-01-P FEDERAL ELECTION COMMISSION Sunshine Act Meetings AGENCY: Federal Election Commission. ...

  19. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    alternatives which would accomplish the objectives of the Javits-Wagner- O'Day Act (41 U.S.C. 8501-8506) in connection with the services deleted from the Procurement List. ...

  20. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    grantee is not financially stable; has a history of unsatisfactory performance; has a ... from the United States to Canada pursuant to section 202(e) of the Federal Power Act. ...

  1. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    emissions of a coal-fired power plant (See Table 7-1, Comparison of Annual CO 2 Emission Rates). 3. C: The Vogtle Electric Generating Plant will not meet Clean Air Act standards. ...

  2. Residual Symmetries Applied to Neutrino Oscillations at NO?A and T2K

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hanlon, Andrew D.; Repko, Wayne W.; Dicus, Duane A.

    2014-01-01

    The results previously obtained from the model-independent application of a generalized hidden horizontalZ2symmetry to the neutrino mass matrix are updated using the latest global fits for the neutrino oscillation parameters. The resulting prediction for the DiracCPphase?Dis in agreement with recent results from T2K. The distribution for the Jarlskog invariantJ?has become sharper and appears to be approaching a particular region. The approximate effects of matter on long-baseline neutrino experiments are explored, and it is shown how the weak interactions between the neutrinos and the particles that make up the Earth can help to determine the massmorehierarchy. A similar strategy is employed to show how NO?A and T2K could determine the octant of?a(??23). Finally, the exact effects of matter are obtained numerically in order to make comparisons with the form of the approximate solutions. From this analysis there emerge some interesting features of the effective mass eigenvalues.less

  3. Notices

    Office of Environmental Management (EM)

    9

    70 Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices 1 The authority to regulate the imports and exports of natural gas, including liquefied natural gas, under section 3 of the NGA (15 U.S.C. 717b) has been delegated to the Assistant Secretary for FE in Redelegation Order No. 00-006.02 issued on November 17, 2014. 2 10 CFR part 590 (2012). 3 Federal Energy Regulatory Commission, Final Environmental Impact Statement for the Lake Charles Liquefaction Project,

  4. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    107 Federal Register / Vol. 80, No. 52 / Wednesday, March 18, 2015 / Notices 1 With respect to a given amount of LEU, the ''natural uranium equivalent'' is the amount of natural uranium feed that would be required to produce that amount of LEU. The ratio of feed to product is a function of the assay of the feed and the desired assays of the enriched product and the depleted tails (''assay'' refers to the ratio of the fissile isotope U-235 to other isotopes of uranium such as U-234 and U-238).

  5. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    70 Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices 1 The authority to regulate the imports and exports of natural gas, including liquefied natural gas, under section 3 of the NGA (15 U.S.C. 717b) has been delegated to the Assistant Secretary for FE in Redelegation Order No. 00-006.02 issued on November 17, 2014. 2 10 CFR part 590 (2012). 3 Federal Energy Regulatory Commission, Final Environmental Impact Statement for the Lake Charles Liquefaction Project, Docket Nos. CP14-

  6. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices 1 On Oct. 10, 2014, Trunkline LNG Export, LLC filed a request in DOE/FE Dkt. No. 13-04-LNG to change its corporate name to Lake Charles LNG Export Company, LLC. Subsequently, DOE/FE issued Order 3252-A granting the name change. See Lake Charles LNG Export Company, LLC, DOE/FE Order No. 3252-A, FE Dkt. No. 13-04-LNG (March 18, 2015). 2 The authority to regulate the imports and exports of natural gas, including liquefied

  7. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    54 Federal Register / Vol. 79, No. 7 / Friday, January 10, 2014 / Notices that, effective March 12, 2009, it changed its legal name to NextEra Energy Power Marketing, LLC. Accordingly, on March 26, 2009, DOE issued Order No. EA-348-A, in which it amended the original order by changing the name of the authorized exporter to NEPM. All other terms and conditions of Order No. EA-348 remained unchanged. On December 20, 2013, NEPM filed an application with DOE for renewal of the export authority

  8. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    61 Federal Register / Vol. 79, No. 107 / Wednesday, June 4, 2014 / Notices invite comments on the LCA GHG Report, as applied to the pending matters. The LCA GHG Report The LCA GHG Report was conducted by the National Energy Technology Laboratory (NETL), a DOE laboratory. The LCA GHG Report estimates the life cycle GHG emissions of U.S. LNG exports to Europe and Asia, compared with alternative supplies, to produce electric power. For additional information on the natural gas model, refer to the

  9. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69 Federal Register / Vol. 79, No. 131 / Wednesday, July 9, 2014 / Notices Register. Free Internet access to the official edition of the Federal Register and the Code of Federal Regulations is available via the Federal Digital System at: www.gpo.gov/fdsys. At this site you can view this document, as well as all other documents of this Department published in the Federal Register, in text or Adobe Portable Document Format (PDF). To use PDF you must have Adobe Acrobat Reader, which is available

  10. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    443 Federal Register / Vol. 79, No. 179 / Tuesday, September 16, 2014 / Notices 1 Cameron LNG, LLC, 134 FERC ¶ 61,049 (2011). 2 Cameron previously sought authorization to export the same quantity of LNG to any country with which the United States has, or in the future may enter into, a FTA requiring national treatment for trade in natural gas (FTA countries). DOE/FE granted that FTA authorization by order dated January 17, 2012. Department published in the Federal Register, in text or Adobe

  11. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    101 Federal Register / Vol. 79, No. 224 / Thursday, November 20, 2014 / Notices 1 Freeport LNG Expansion L.P. and FLNG Liquefaction, LLC, DOE/FE Order No. 3282, FE Docket No. 10-161-LNG, Order Conditionally Granting Long-Term Multi-Contract Authorization to Export Liquefied Natural Gas by Vessel from the Freeport LNG Terminal on Quintana Island, Texas to Non-Free Trade Agreement Nations (May 17, 2013). 2 15 U.S.C. 717b(a). This authority is delegated to the Assistant Secretary for Fossil Energy

  12. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    77 Federal Register / Vol. 79, No. 235 / Monday, December 8, 2014 / Notices 1 The Final EIS can be found on the RUS Web site at: http://www.rurdev.usda.gov/UWP-AVS- Neset.html. Process: Any proposed change to the Base component will require a public process. The Drought Adder may be adjusted annually using the above formulas for any costs attributed to drought of less than or equal to the equivalent of 2 mills/kWh to the Power Repayment Study (PRS) composite rate. Any planned incremental upward

  13. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2033 Federal Register / Vol. 79, No. 138 / Friday, July 18, 2014 / Notices location listed in the ADDRESSES section during the hours of 9:00 a.m. to 5:00 p.m., Eastern Time, Monday through Friday except for legal holidays. Before including your address, phone number, email address or other personally identifiable information in your comment, you should be aware that your entire comment-including your personally identifiable information- may be made publicly available at any time. While you can

  14. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    431 Federal Register / Vol. 80, No. 223 / Thursday, November 19, 2015 / Notices 1 Order Accepting Settlement Agreement and Granting Exemption from Licensing (5MW or less), (48 FERC ¶ 61,188). Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2015-11-10 Filing to Maintain Default Loss Allocation Provisions Effectiveness to be effective 2/11/2016. Filed Date: 11/10/15. Accession Number: 20151110-5165. Comments Due: 5 p.m. ET 12/1/15. Docket

  15. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    88 Federal Register / Vol. 81, No. 65 / Tuesday, April 5, 2016 / Notices 1 DOE suspended disposal activities at WIPP in February 2014 following a salt truck fire and unrelated radiological event underground. Waste emplacement operations at WIPP are expected to commence in late 2016. to 9:30 p.m. CDT. Informal poster sessions will be held from 4:00 p.m. until 5:00 p.m. CDT and again after 9:30 p.m. CDT. Department officials will be available to discuss consent-based siting during the poster

  16. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1622 Federal Register / Vol. 81, No. 97 / Thursday, May 19, 2016 / Notices http://www.fe.doe.gov/programs/ gasregulation/index.html. Issued in Washington, DC, on May 13, 2016. John A. Anderson, Director, Office of Regulation and International Engagement, Office of Oil and Natural Gas. [FR Doc. 2016-11812 Filed 5-18-16; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY [OE Docket No. PP-420] Application for Presidential Permit; Nogales Interconnection Project AGENCY: Office of Electricity

  17. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    45139 Federal Register / Vol. 81, No. 133 / Tuesday, July 12, 2016 / Notices Policy and Compliance (GC-54), U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585, (202) 586-4600, or leave a message at (800) 472-2756. This Amended ROD, the SA, and related NEPA documents are available on the DOE NEPA Web site at www.energy.gov/ nepa. SUPPLEMENTARY INFORMATION: Background Y-12 is NNSA's primary site for uranium operations, including EU processing and storage, and is one of

  18. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    667 Federal Register / Vol. 76, No. 187 / Tuesday, September 27, 2011 / Notices agreement with an eligible lender trustee. Further, when an approved not- for-profit holder has a change in status, within 10 days of becoming aware of the occurrence of a change that may result in a State or non-profit entity that has been designated an eligible not-for- profit holder, either directly or through an eligible lender trustee, losing that eligibility, the State or non-profit entity must submit details

  19. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Federal Register / Vol. 80, No. 146 / Thursday, July 30, 2015 / Notices the Commission will not accept requests for intervenor status at this time. You must wait until the Commission receives a formal application for the project. Additional Information Additional information about the project is available from the Commission's Office of External Affairs, at (866) 208-FERC, or on the FERC Web site (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ''General Search''

  20. Notices

    Energy Savers [EERE]

    3482 Federal Register / Vol. 81, No. 156 / Friday, August 12, 2016 / Notices to gather information on the potential for an Energy Savings Performance Contract Energy Sales Agreement (ESPC ESA) project to qualify as a service contract under 26 U.S.C. 7701(e) and thus remain eligible for the 26 U.S.C. 48 solar investment tax credit (ITC). The RFC requests commenters to identify any specific language included in 26 U.S.C. 7701(e)(4)(A)(i)-(iv) that could benefit from clarification in the form of

  1. Notices

    National Nuclear Security Administration (NNSA)

    4908 Federal Register / Vol. 77, No. 173 / Thursday, September 6, 2012 / Notices and 214 of the Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission's eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing

  2. Notice of OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants

    Broader source: Energy.gov [DOE]

    The Office of Management and Budget (OMB) has issued a Notice of OMB Action approving the Department of Energy's request to extend for three years the Information Collection Request Title: OE...

  3. EIS-0470: EPA Notice of Adoption of the Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 0: EPA Notice of Adoption of the Final Environmental Impact Statement EIS-0470: EPA Notice of Adoption of the Final Environmental Impact Statement Cape Wind Energy Project in Nantucket Sound, Massachusetts The Environmental Protection Agency's Notice, dated December 26, 2012, of DOE's adoption of the U.S. Department of the Interior's final EIS was published in the Federal Register on December 31, 2012. EIS-0470-FEIS-EPA-NOA-2012.pdf (192.06 KB) More Documents

  4. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Required Annual Notices The Women's Health and Cancer Rights Act of 1998 (WHCRA) The medical programs sponsored by LANS will not restrict benefits if you or your dependent...

  5. Biomass Research and Development Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Act Biomass Research and Development Act Biomass Research and Development Act Amended by the Food, Conservation and Energy Act of 2008. fcea_energy_act_2008.pdf (41.25 KB) More Documents & Publications Biomass Research and Development Act of 2000 Notice of Reestablishment of the Electricity Advisory Committee: Federal Register Notice Volume 75, No. 135 - Jul. 15, 2010 42 USC 17013

  6. Notices ACTION: Notice of Open Teleconference Meeting.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    405 Federal Register / Vol. 78, No. 160 / Monday, August 19, 2013 / Notices ACTION: Notice of Open Teleconference Meeting. SUMMARY: This notice announces a meeting of the Advanced Scientific Computing Advisory Committee (ASCAC). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register. DATES: Tuesday, September 3, 2013, 12:00 p.m. to 3:00 p.m. ADDRESSES: The meeting is open to the public. To access the

  7. Notices ACTION: Notice.

    Office of Environmental Management (EM)

    8867 Federal Register Vol. 80, No. 215 Friday, November 6, 2015 Notices ACTION: Notice. SUMMARY: This notice announces EPA's receipt of an application 91163-EUP-R from Texas...

  8. Notices ACTION: Notice.

    Energy Savers [EERE]

    867 Federal Register Vol. 80, No. 215 Friday, November 6, 2015 Notices ACTION: Notice. SUMMARY: This notice announces EPA's receipt of an application 91163-EUP-R from Texas...

  9. Recovery Act, Office of the Biomass Program,Funding Opportunity

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Announcements Special Notice | Department of Energy Act, Office of the Biomass Program,Funding Opportunity Announcements Special Notice Recovery Act, Office of the Biomass Program,Funding Opportunity Announcements Special Notice A description of The U.S. Department of Energy's (DOE's) Office of the Biomass Program (OBP) intends to issue two Funding Opportunity Announcements (FOAs) Recovery Act, Office of the Biomass Program,Funding Opportunity Announcements Special Notice (22.62 KB) More

  10. Federal Register Notice For Electricity Advisory Committee -...

    Broader source: Energy.gov (indexed) [DOE]

    This notice announces a meeting of the Electricity Advisory Committee (EAC). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this...

  11. Notice of Reestablishment of the Electricity Advisory Committee...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biomass Research and Development Act Biomass Research and Development Act of 2000 Electricity Advisory Committee Meeting Notice of Open Meeting October 29, 2010: Federal Register ...

  12. SEP PROGRAM NOTICE 10-006A | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROGRAM NOTICE 10-006A SEP PROGRAM NOTICE 10-006A DOE RECOVERY ACT REPORTING REQUIREMENTS FOR THE STATE ENERGY PROGRAM (SEP) sep_10-006a_arra_reporting_guidance.pdf (230.76 KB) More Documents & Publications SEP Program Notice 10-006B SEP Program Notice 10-006C EECBG Program Notice 10-07C

  13. Achieving a Net Zero Energy Retrofit – in a humid, temperate climate – lessons from the University of Hawai’i at Mānoa

    SciTech Connect (OSTI)

    Regnier, Cindy; Harding, Ari; Robinson, Alastair

    2015-07-01

    The University of Hawai’i at Mānoa (UHM) partnered with the US Department of Energy (DOE) and the Hawai`i Clean Energy Initiative to develop and implement solutions to retrofit exiting buildings to reduce energy consumption by at least 30% as part of DOE’s Commercial Building Partnerships (CBP) Program1. Kuykendall Hall, located on the UHM campus in Honolulu, was the focus of a CBP analysis and design collaboration among the University of Hawai’i, their consultants, and Lawrence Berkeley National Laboratory (LBNL). Kuykendall Hall consists of two 1960s-era wings – a four-story wing containing classrooms, and a seven-story tower containing offices – with a total floor area of approximately 76,000 square feet (ft²).

  14. Paperwork Reduction Act Submission (OMB 83-I) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Submission (OMB 83-I) Paperwork Reduction Act Submission (OMB 83-I) Paperwork Reduction Act Submission (OMB 83-I) Paperwork Reduction Act Submission (OMB 83-I) (173.6 KB) More Documents & Publications Paperwork Reduction Act Forms 83-I Paperwork Reduction Act Submission form Notice of OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants

  15. 83-I Paperwork Reduction Act Submission form | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    83-I Paperwork Reduction Act Submission form 83-I Paperwork Reduction Act Submission form 83-I Paperwork Reduction Act Submission form.pdf (50.46 KB) More Documents & Publications Paperwork Reduction Act Forms Paperwork Reduction Act Submission (OMB 83-I) Notice of OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants

  16. Energy Policy Act of 2005, Section 1813, Draft Report to Congress...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Policy Act of 2005, Section 1813, Draft Report to Congress: Federal Register Notice ... Notice of publication of draft report to Congress: Section 1813 of the Energy Policy Act ...

  17. SEP Notice 10-011 / EECBG Program Notice 10-013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice 10-011 / EECBG Program Notice 10-013 SEP Notice 10-011 / EECBG Program Notice 10-013 This document provides guidance to Department of Energys (DOEs) State Energy Program (SEP) and Energy Efficiency and Conservation Block Grant (EECBG) Program Grantees on permissible methods for accelerating draw down of authorized funds and payments for projects and activities, in order to meet the goals of the American Recovery and Reinvestment Act of 2009 (Recovery Act).

  18. Electricity Advisory Committee - Federal Register Notices | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Federal Register Notices Electricity Advisory Committee - Federal Register Notices Electricity Advisory Committee - Federal Register Notices April 8, 2016 Electricity Advisory Committee Notice of Open Meeting March 17 and 18, 2016: Federal Register Notice Volume 81, No. 29 - February 12, 2016 This notice announces an open meeting of the Electricity Advisory Committee (EAC) on March 17 and 18, 2016. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public

  19. Notification of General User Proposal and Approved Program Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Services » NEPA Documents » Notices of Availability (NOA) Notices of Availability (NOA) A Notice of Availability (NOA) is a formal notice, published in the Federal Register, that announces the issuance and public availability of a draft or final EIS. The Environmental Protection Agency NOA is the official public notification of an EIS; a DOE NOA is an optional notice used to provide information to the public. If you have any trouble finding a specific document, please contact

  20. Notices ENVIRONMENTAL PROTECTION AGENCY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    41 Federal Register / Vol. 80, No. 243 / Friday, December 18, 2015 / Notices ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9024-5] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7146 or http://www2.epa.gov/nepa. Weekly receipt of Environmental Impact Statements Filed 12/07/2015 Through 12/11/2015 Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on

  1. National Environmental Policy Act (NEPA) Process

    National Nuclear Security Administration (NNSA)

    National Environmental Policy Act (NEPA) Process ENERGY U.S. DEPARTMENT OF Steps to SWEIS Development Notice of Intent to Prepare SWEIS Public Scoping Period Opportunities for Public Input Preparation of Draft SWEIS Notice of Availability for Draft SWEIS Public Comment Period Preparation of Final SWEIS Notice of Availability of Final SWEIS Published in the Federal Register 30-Day Waiting Period Record of Decision Sandia National Laboratories is a multi-program laboratory managed and operated by

  2. American Recovery and Reinvestment Act, Financial Assistance...

    Broader source: Energy.gov (indexed) [DOE]

    American Recovery and Reinvestment Act, Financial Assistance Award: 212 Degrees Consulting, LLC, Las Vegas, Nevada. Award No. DE-FC36-10GO10589, Notice of Financial Assistance ...

  3. Act One: NPCP (2013-CE-49001)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Act One Communications, Inc. failed to certify a variety of traffic signal modules and pedestrian modules as compliant with the applicable energy conservation standards.

  4. U.S. Environmental Protection Agency Clean Air Act notice of construction for spent nuclear fuel project - hot conditioning system annex, project W-484

    SciTech Connect (OSTI)

    Baker, S.K., Westinghouse Hanford

    1996-12-10

    This notice of construction (NOC) provides information regarding the source and the estimated quantity of potential airborne radionuclide emissions resulting from the operation of the Hot Conditioning System (HCS) Annex. The construction of the HCS Annex is scheduled to conunence on or about December 1996, and will be completed when the process equipment begins operations. This document serves as a NOC pursuant to the requirements of 40 Code of Federal Regulations (CFR) 61 for the HCS Annex. About 80 percent of the U.S. Department of Energy`s spent nuclear fuel (SNF) inventory is stored under water in the Hanford Site K Basins. Spent nuclear fuel in the K West Basin is contained in closed canisters, while the SNF in the K East Basin is contained in open canisters, which allows release of corrosion products to the K East Basin water. Storage of the current inventory in the K Basins was originally intended to be on an as-needed basis to sustain operation of the N Reactor while the Plutonium-Uranium Extraction (PUREX) Plant was refurbished and restarted. The decision in December 1992 to deactivate the PUREX Plant left approximately 2, 1 00 MT (2,300 tons) of uranium, as part of 1133 N Reactor SNF in the K Basins with no means for near-term removal and processing. The HCS Annex will be constructed as an annex to the Canister Storage Building (CSB) and will contain the hot conditioning equipment. The hot conditioning system (HCS) will release chemically-bound water and will condition (process of using a controlled amount of oxygen to destroy uranium hydride) the exposed uranium surfaces associated with the SNF through oxidation. The HCS Annex will house seven hot conditioning process stations, six operational and one auxiliary, which could be used as a welding area for final closure of the vessel containing the SNF. The auxiliary pit is being evaluated at this time for its usefulness to support other operations that may be needed to ensure proper conditioning of the SNF

  5. Notices TABLE

    Broader source: Energy.gov (indexed) [DOE]

    Environmental Protection Agency (EPA). ACTION: Notice of a final decision on a no migration petition reissuance. SUMMARY: Notice is hereby given that a reissuance of an...

  6. EIS-0459: EPA Notice of Availablity for the Draft Programmatic...

    Office of Environmental Management (EM)

    Programmatic Environmental Impact Statement EPA announced the availability of DOE's Hawaii Clean Energy Draft Programmatic EIS. EIS-0459-EPA-NOA-2014.pdf More Documents &...

  7. Notice of OMB Action Approving DOE Submission to Extend Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants The Office of Management and Budget (OMB) ...

  8. Notice of proposed rulemaking and public hearing | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of proposed rulemaking and public hearing The U.S. ... with the National Environmental Policy Act (NEPA). ... contained in its NEPA Implementing Procedures, with a ...

  9. EIS-0374: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    III Wind Project Interconnection, Sherman County, Oregon This notice announces BPA's intention to prepare an EIS, under the National Environmental Policy Act (NEPA), on a proposed...

  10. Electricity Advisory Committee Notice of Open Meeting March 5...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electricity Advisory Committee Notice of Open Meeting March 5 and 6, 2012: Federal ... Advisory Committee (EAC) on March 5 and 6, 2012. The Federal Advisory Committee Act (Pub. ...

  11. Electricity Advisory Committee Notice of Open Meeting July 12, 2011: Federal Register Notice Volume 76, No. 122- Jun. 24, 2011

    Broader source: Energy.gov [DOE]

    Electricity Advisory Committee Meeting. This notice announces a meeting of the reestablished Electricity Advisory Committee (EAC) on July 12, 2011. The Federal Advisory Committee Act (Pub. L. 92...

  12. HIPAA Special Enrollment Rights Notice HIPAA Special Enrollment Rights Notice

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HIPAA Special Enrollment Rights Notice HIPAA Special Enrollment Rights Notice The Health Insurance Portability and Accountability Act of 1996 (HIPAA) provides employees additional opportunities to enroll in a group health plan if they experience a loss of other coverage or certain life events. If you are declining coverage at this time for either yourself or your eligible dependents, you may be able to enroll yourself and/or your eligible dependents in coverage at a later date if there is a loss

  13. Recovery Act

    Broader source: Energy.gov [DOE]

    Recovery Act and Energy Department programs were designed to stimulate the economy while creating new power sources, conserving resources and aligning the nation to once again lead the global energy economy.

  14. Appendix A. Notice of Inquiry: Preparation of Report to Congress...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Congress on Price-Anderson Act. 62 Federal Register 68,272 (December 31, 1997) Appendix A. Notice of Inquiry: Preparation of Report to Congress on Price-Anderson Act. 62 Federal ...

  15. Information Collection Requests/Paper Reduction Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Collection Requests/Paper Reduction Act Information Collection Requests/Paper Reduction Act Training Presentation on the on Information Collection and the Paper Reduction Act Information Collection Requests/Paper Reduction Act (161.84 KB) More Documents & Publications Step by Step Instruction - ICR - FINAL Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial

  16. Projects Funded by the American Recovery and Reinvestment Act of 2009 and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administered by the Office of Energy Efficiency and Renewable Energy (EERE) Notice | Department of Energy Projects Funded by the American Recovery and Reinvestment Act of 2009 and Administered by the Office of Energy Efficiency and Renewable Energy (EERE) Notice Projects Funded by the American Recovery and Reinvestment Act of 2009 and Administered by the Office of Energy Efficiency and Renewable Energy (EERE) Notice U.S. Department of Energy (DOE) National Environmental Policy Act (NEPA)

  17. STATE ENERGY PROGRAM NOTICE (10-004A), ENERGY EFFICIENCY CONSERVATION BLOCK GRANT PROGRAM NOTICE (10-005A), AND APPLIANCE REBATE PROGRAM NOTICE (10-001A)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REVISION: THIS GUIDANCE HAS BEEN AMENDED FROM THE JANUARY 11, 2010. THE CHANGE IN THIS AMENDED GUIDANCE IS RELATED TO SEP AND EECBG FINANCING PROGRAMS FOR INDIVIDUAL HOMEOWNERS. STATE ENERGY PROGRAM NOTICE (10-004A), ENERGY EFFICIENCY CONSERVATION BLOCK GRANT PROGRAM NOTICE (10-005A), AND APPLIANCE REBATE PROGRAM NOTICE (10-001A) EFFECTIVE DATE: April 7, 2010 SUBJECT: GUIDANCE ON DAVIS BACON ACT (DBA) REQUIREMENTS FOR AMERICAN REINVESTMENT AND RECOVERY ACT OF 2009 (ARRA)- FUNDED REBATE, GRANT

  18. EPA EIS NOAs.pdf

    Broader source: Energy.gov (indexed) [DOE]

    ... and Reuse of the Former Naval Weapons Station Seal Beach, Detachment Concord, Comment ... The docket for this action, identified by docket identification (ID) number ...

  19. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Notices  The Women's Health and Cancer Rights Act of 1998 (WHCRA) The medical programs sponsored by LANS will not restrict benefits if you or your dependent receives benefits for a mastectomy and elects breast reconstruction in connection with the mastectomy. Benefits will not be restricted provided that the breast reconstruction is performed in a manner determined in consultation with you or your dependent's physician and may include:  all stages of reconstruction of the breast on

  20. Electricity Advisory Committee Notice of Open Meeting June 5 and 6, 2013: Federal Register Notice Volume 78, No. 93- May 14, 2013

    Broader source: Energy.gov [DOE]

    This notice announces a meeting of the Electricity Advisory Committee (EAC). The Federal Advisory Committee Act (Pub. L. 92–463, 86 Stat. 770) requires that public notice of these meetings be...

  1. Electricity Advisory Committee Notice of Open Meeting March 6 and 7, 2013: Federal Register Notice Volume 78, No. 26- Feb. 7, 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    This notice announces a meeting of the Electricity Advisory Committee (EAC). The Federal Advisory Committee Act (Pub. L. 92–463, 86 Stat. 770) requires that public notice of these meetings be...

  2. Notice of Availability (NOA) for the Draft Environmental Impact Statement (EIS) and Announcement of Public Hearings for the Proposed New England Clean Power Link (NECPL) Transmission Line: Federal Register Notice, Volume 80, No. 113- Jun. 12, 2015

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) announces the availability of the “Draft Environmental Impact Statement for the New England Clean Power Link Transmission Line Project” (DOE/EIS-0503) for public review and comment.

  3. Notice of Availability (NOA) for the Draft Environmental Impact Statement (EIS) and Announcement of Public Hearings for the Proposed Great Northern Transmission Line (GNTL) Project: Federal Register Notice, Volume 80, No. 123- Jun. 26, 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy (DOE) announces the availability of the “Great Northern Transmission Line Project Draft Environmental Impact Statement” (DOE/EIS-0499) for public review and comment. DOE is also announcing eight public hearings to receive comments on the Draft EIS.

  4. EECBG Federal Register Notice May 24, 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Register Notice May 24, 2010 EECBG Federal Register Notice May 24, 2010 This notice advises the public that applications under the Funding Opportunity Announcement (DE…FOA…0000013) for the formula grants of the Energy Efficiency and Conservation Block Grant (EECBG) Program of the American Recovery and Reinvestment Act of 2009 will not be accepted after June 25, 2010. eecbg_federal_register_notice_20100524.pdf (65.38 KB) More Documents & Publications Application to export electric

  5. Rescission of American Recovery and Reinvestment Act Reporting Requirements

    Broader source: Energy.gov [DOE]

    Financial Assistance Letter (FAL) 2014-xx provides COs with: 1) notice of the recession of the reporting requirements for recipients of ARRA funds in accordance with the recently passed P.L. 113-76, Consolidated Appropriations Act, 2014

  6. RAPID/Roadmap/9-FD-d | Open Energy Information

    Open Energy Info (EERE)

    Appeals. 43 CFR 4.700. 9-FD-d.2 - File Notice of Appeal (NOA) and File Petition for Stay The appellant is required to file a Notice of Appeal (NOA) in the office that made the...

  7. Elink - Notices

    Office of Scientific and Technical Information (OSTI)

    Notices The completion of an Announcement Notice (AN) is required when providing scientific and technical information (STI) to OSTI. A set of metadata is defined for specific types of STI for use in describing an STI product for announcement and availability. The Announcement Notice is transmitted electronically to OSTI for STI products and includes review and release information, enabling announcement and access as appropriate via online databases. Technical reports or announcements of other

  8. Recovery Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Recovery Act - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear Energy

  9. EA-1880: Notice of Intent to Prepare an Environmental Assessment and Notice

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Public Meetings | Department of Energy Intent to Prepare an Environmental Assessment and Notice of Public Meetings EA-1880: Notice of Intent to Prepare an Environmental Assessment and Notice of Public Meetings Big Bend to Witten Transmission Line Project, South Dakota The Rural Utilities Service (RUS) intends to hold public scoping meetings and prepare an Environmental Assessment with Scoping (EA) to meet its responsibilities under the National Environmental Policy Act (NEPA) and 7 CFR

  10. Notice of Proposed Rulemaking: Federal Register Notice Volume 76, No. 239

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Dec. 13, 2011 | Department of Energy Proposed Rulemaking: Federal Register Notice Volume 76, No. 239 - Dec. 13, 2011 Notice of Proposed Rulemaking: Federal Register Notice Volume 76, No. 239 - Dec. 13, 2011 The Department of Energy proposes to amend its regulations for the timely coordination of Federal authorizations for proposed interstate electric transmission facilities pursuant to section 216(h) of the Federal Power Act (FPA). The proposed rule would require permitting entities to

  11. Comments and recommendations on Notice of Inquiry re Price-Anderson...

    Broader source: Energy.gov (indexed) [DOE]

    Register "Notice of Inquiry concerning preparation of report to Congress on the Price-Anderson Act" (Notice) of December 31, 1997. The Group consists of The Group consists of...

  12. Federal Register Notice For Electricity Advisory Committee- October 19 and 20th, 2011

    Broader source: Energy.gov [DOE]

    This notice announces a meeting of the Electricity Advisory Committee (EAC). The Federal Advisory Committee Act (Pub. L. 92–463, 86 Stat. 770) requires that public notice of this meeting be...

  13. Electricity Advisory Committee Meeting Notice of Open Meeting October 29, 2010: Federal Register Notice Volume 75, No. 192- Oct. 5, 2010

    Broader source: Energy.gov [DOE]

    Electricity Advisory Committee Meeting. This notice announces a meeting of the reestablished Electricity Advisory Committee (EAC) on October 29, 2010. The Federal Advisory Committee Act (Pub. L. 92...

  14. Electricity Advisory Committee Meeting Notice of Open Meeting March 10, 2011: Federal Register Notice Volume 76, No. 38- Feb. 25, 2011

    Broader source: Energy.gov [DOE]

    Electricity Advisory Committee Meeting. This notice announces a meeting of the reestablished Electricity Advisory Committee (EAC) on March 10, 2011. The Federal Advisory Committee Act (Pub. L. 92...

  15. Electricity Advisory Committee Notice of Open Meeting October 19 and 20, 2011: Federal Register Notice Volume 76, No. 187- Sep. 27, 2011

    Broader source: Energy.gov [DOE]

    Electricity Advisory Committee Meeting. This notice announces a meeting of the reestablished Electricity Advisory Committee (EAC) on October 19 and 20, 2011. The Federal Advisory Committee Act (Pub...

  16. EECBG Program Notice 10-07A | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A EECBG Program Notice 10-07A Provides information DOE Recovery Act reporting requirements for the EECBG program. eecbg_arra_reporting_requirements.pdf (277.41 KB) More Documents & Publications DOE Recovery Act Reporting Requirements for the State Energy Program EECBG PROGRAM NOTICE 10-07B WPN 10-14a: Calculation of Job Creation through DOE Recovery Act Funding - Updated

  17. Notice of Office of Management and Budget Action to Approve with...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial ...

  18. Notice of Office of Management and Budget Action to Approve with...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance ...

  19. STATE ENERGY PROGRAM NOTICE (10-004A), ENERGY EFFICIENCY CONSERVATION...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENERGY EFFICIENCY CONSERVATION BLOCK GRANT PROGRAM NOTICE (10-005A), AND APPLIANCE ... ACT OF 2009 (ARRA)- FUNDED REBATE, GRANT AND FINANCING PROGRAMS FOR INDIVIDUAL ...

  20. EIS-0309: Notice of Intent to Prepare a Site-Wide Environmental...

    Office of Environmental Management (EM)

    Notice of Intent to Prepare a Site-Wide Environmental Impact Statement Oak Ridge Y-12 Plant Pursuant to the National Environmental Policy Act (NEPA), DOE announces its...

  1. Optimization Notice

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Copyright © 2016, Intel Corporation. All rights reserved. *Other names and brands may be claimed as the property of others. Optimization Notice 2 Agenda Scaling with MPI Performance Snapshot Tuning MPI Performance with Intel® Trace Analyzer and Collector Copyright © 2016, Intel Corporation. All rights reserved. *Other names and brands may be claimed as the property of others. Optimization Notice 4 Application Growth Problem Growth Cluster Growth Application/Tool Performance Application Size

  2. 30-Day Federal Register Notice - Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revised 11-2009 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the

  3. 30-Day Federal Register Notice - Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that

  4. American Recovery and Reinvestment Act, Financial Assistance Award: 212

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Degrees Consulting, LLC | Department of Energy American Recovery and Reinvestment Act, Financial Assistance Award: 212 Degrees Consulting, LLC American Recovery and Reinvestment Act, Financial Assistance Award: 212 Degrees Consulting, LLC American Recovery and Reinvestment Act, Financial Assistance Award: 212 Degrees Consulting, LLC, Las Vegas, Nevada. Award No. DE-FC36-10GO10589, Notice of Financial Assistance Award (110.94 KB) Award No. DE-FC36-10GO10589, Special Terms and Conditions

  5. EIS-0458: DOE Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed Loan Guarantee to Support Construction and Startup of the Topaz Solar Farm, San Luis Obispo County, CA PDF icon EIS-0458-NOA-FEIS-20110.pdf More Documents &...

  6. EIS-0403: EPA Notice of Availability of the Final Programmatic...

    Broader source: Energy.gov (indexed) [DOE]

    U.S. Department of Energy and the U.S. Department of the Interior's Bureau of Land Management are Joint Lead Agencies. EIS-0403-EPA-NOA-FEIS-2012.pdf More Documents & Publications...

  7. EIS-0312: Notice of Availability of the Bonneville Power Administratio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Record of Decision: Columbia Basin Fish Accords Memorandum of Agreement (MOA) with the Kalispel Tribe on Columbia Basin Fish Accords EIS-0312-ROD-NOA-2012.pdf (178 KB) ...

  8. Electricity Advisory Committee Notice of Open Meeting March 12...

    Broader source: Energy.gov (indexed) [DOE]

    This notice announces a meeting of the Electricity Advisory Committee (EAC) on March 12 and 13, 2014. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires...

  9. Electricity Advisory Committee Notice of Open Teleconference January 24 2014: Federal Register Notice Volume 78, No. 246- December 23, 2013

    Broader source: Energy.gov [DOE]

    This notice announces a meeting of the Electricity Advisory Committee (EAC) on January 24, 2014. The Federal Advisory Committee Act (Pub. L. 92–463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.

  10. Weatherization Program Notice 10-13A | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Notice 10-13A Weatherization Program Notice 10-13A wap_arra_reporting_requirements.pdf (256.11 KB) More Documents & Publications WPN 10-13a: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program WPN 10-13: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements Under the American Recovery and Reinvestment Act of 2009 for the

  11. State Energy Program Notice 10-006D, Reporting Requirements | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy State Energy Program Notice 10-006D, Reporting Requirements State Energy Program Notice 10-006D, Reporting Requirements State Energy Program (SEP) Notice 10-006D provides guidance to SEP recipients on the requirements of reporting for SEP Recovery Act awards under the American Recovery and Reinvestment Act of 2009 and SEP formula awards under the Energy Policy and Conservation Act. State Energy Program Notice 10-006D, Reporting Requirements (6.27 MB) More Documents & Publications

  12. Notices CHART

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    436 Federal Register / Vol. 78, No. 168 / Thursday, August 29, 2013 / Notices CHART 5-FIXED-RATE FEDERAL SUBSIDIZED AND UNSUBSIDIZED STAFFORD AND PLUS LOANS-Continued Loan type Student grade level First disbursed on or after First disbursed before Rate (percent) Unsubsidized ................................................... All Students .................................................... 7/1/2006 7/1/2010 6.80 PLUS ............................................................... Parents and

  13. WIPP Documents - National Environmental Policy Act (NEPA)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Environmental Policy Act (NEPA) Adoption of Environmental Assessment DOI-BLM-NM-P020-11-1414 Double Eagle Water System DOE/EA-1905 October 2011 This document examines the potential environmental impacts associated with providing DOE funding for the proposed improvements to the City of Carlsbad Double Eagle Water System Amendment to the Record of Decision for the Department of Energy's Waste Management Program: Treatment and Storage of Transuranic Waste This Federal Register Notice

  14. Electricity Advisory Committee Notice of Open Meeting September 28 and 29,

    Office of Environmental Management (EM)

    Federal Register Notice Volume 80, No. 99 - May 22, 2015 | Department of Energy June 29 and 30, 2015: Federal Register Notice Volume 80, No. 99 - May 22, 2015 Electricity Advisory Committee Notice of Open Meeting June 29 and 30, 2015: Federal Register Notice Volume 80, No. 99 - May 22, 2015 This notice announces an open meeting of the Electricity Advisory Committee (EAC) on June 29 and 30, 2015. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of

  15. Electricity Advisory Committee Notice of Open Meeting June 16 and 17, 2014:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Register Notice Volume 79, No. 103 - May 29, 2014 | Department of Energy 6 and 17, 2014: Federal Register Notice Volume 79, No. 103 - May 29, 2014 Electricity Advisory Committee Notice of Open Meeting June 16 and 17, 2014: Federal Register Notice Volume 79, No. 103 - May 29, 2014 This notice announces a meeting of the Electricity Advisory Committee (EAC) on June 16 and 17, 2014. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of these

  16. Federal Register Notice: Proposed Agency Information Collection

    Broader source: Energy.gov [DOE]

    Federal Register Notice on the DOE’s invitation for public comment on its request to the Office of Management and Budget (OMB) to extend for three years the Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910–5149 that DOE is developing for submission to OMB pursuant to the Paperwork Reduction Act of 1995. Comments due on or before November 7, 2011.

  17. Federal Register Notice: Proposed Agency Information Collection

    Broader source: Energy.gov [DOE]

    Federal Register Notice on the DOE’s invitation for public comment on its intent to request the Office of Management and Budget (OMB) to extend for four years the Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910–5149 that DOE is developing for submission to OMB pursuant to the Paperwork Reduction Act of 1995. Comments due on or before October 11, 2011.

  18. DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM...

    Broader source: Energy.gov (indexed) [DOE]

    STATE ENERGY PROGRAM PROGRAM NOTICE 10-010 EFFECTIVE DATE: May 6, 2010 SUBJECT: DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM PROJECTS INVOLVING RESIDENTIAL ...

  19. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act Recovery Act More Documents & Publications Overview of Recovery Act FAR Clauses Map Data: Recovery Act Funding DOE Policy Re Recovery Act Recipient Use of Recovery Act Logos on Signage

  20. Comment re DOE's NOI re continuation or modification of Price-Anderson Act

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy re DOE's NOI re continuation or modification of Price-Anderson Act Comment re DOE's NOI re continuation or modification of Price-Anderson Act Comments of Kerr-McGee Corporation to the "Notice of Inquiry" by DOE seeking comments to assist in the preparation of a report to Congress concerning the continuation or modification of the Price-Anderson Act (the "Act"). These comments will focus solely on question 25 of the notice -- namely, whether the

  1. Notice of Preferred Sodium Bearing Waste Treatment Technology (DOE/EIS-0287) (08/03/05)

    Office of Environmental Management (EM)

    Collection Request Title: OE Recovery Act Financial Assistance Grants | Department of Energy OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants Notice of OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants The Office of Management and Budget (OMB) has issued a Notice of OMB Action approving the Department of Energy's request to extend for

  2. Notice of Office of Management and Budget Action to Approve with Change the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance Grants | Department of Energy a New Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change as an emergency action for six months the

  3. Notice of Office of Management and Budget Action to Approve with Change the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial Assistance Grants | Department of Energy an Extension of the ICR for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection

  4. Calculation of Job Creation Through DOE Recovery Act Funding | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Calculation of Job Creation Through DOE Recovery Act Funding Calculation of Job Creation Through DOE Recovery Act Funding U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Weatherization Assistance Program, State Energy Program, and Energy Efficiency and Conservation Block Grant program notices calculating job creation under projects selected by states, local governments, Indian tribes, and overseas U.S. territories with funding under the 2009

  5. Privacy Act Links to Related Sites | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Links to Related Sites The Privacy Act of 1974 (Title 5, United States Code, Section 552a). The Federal Register is the official daily publication for Rules, Proposed Rules, and Notices of Federal agencies and organizations, as well as Executive Orders and other Presidential Documents. The Privacy Act Issuances Compilation contains descriptions of Federal agency systems of records maintained on individuals and rules agencies follow to assist individuals who request

  6. SEP PROGRAM NOTICE 10-006A

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEP PROGRAM NOTICE 10-006A EFFECTIVE DATE: September 20, 2010 SUBJECT: DOE RECOVERY ACT REPORTING REQUIREMENTS FOR THE STATE ENERGY PROGRAM (SEP) REFERENCES: (1) OMB Memorandum M-09-21 Implementing Guidance for the Reports on the Use of Funds Pursuant to the American Recovery and Reinvestment Act of 2009, June 22, 2009 (Reference 1) (2) OMB Memorandum M-10-08 Updated Guidance on the American Recovery and Reinvestment Act - Data Quality, Non-Reporting Recipients, and Reporting of Job Estimates,

  7. FOIA, The Privacy Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FOIA, the Privacy Act Your Rights under the FOIA, the Privacy Act, and other Privacy Laws The Freedom of Information Act and Privacy Act Division/Office is responsible for administering policies, programs, and procedures to ensure DOE compliance with the Freedom of Information Act (FOIA) and the Privacy Act (PA), 5 U.S.C. 552 and 5 U.S.C. 552a, respectively. The resources on these pages are provided to aid in finding answers to your questions about programs of the Department of Energy and to

  8. Cancellation Notice for Policies, Notices, Orders or Manuals - DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Directives, Delegations, and Requirements Notice for Policies, Notices, Orders or Manuals by Website Administrator Microsoft Word Document icon CancellationNotice-PoliciesNoticesOrdersManuals (2).doc - Microsoft Word Document, 30 KB (3123

  9. Privacy Act of 1974; Publication of Compilation of Privacy Act...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Privacy Act of 1974; Publication of Compilation of Privacy Act Systems of Records Privacy Act of 1974; Publication of Compilation of Privacy Act Systems of Records Privacy Act of ...

  10. Intergovernmental Personnel Act Assignments

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-08-24

    This Manual implements provisions of the Intergovernmental Personnel Act (IPA) within the Department of Energy (DOE) and establishes requirements, responsibilities, and authority for effecting assignments under the Act. Does not cancel other directives.

  11. Recovery Act Milestones

    ScienceCinema (OSTI)

    Rogers, Matt

    2013-05-29

    Every 100 days, the Department of Energy is held accountable for a progress report on the American Recovery and Reinvestment Act. Update at 200 days, hosted by Matt Rogers, Senior Advisor to Secretary Steven Chu for Recovery Act Implementation.

  12. ACT-ARA

    Energy Science and Technology Software Center (OSTI)

    003092IBMPC00 ACT-ARA: Code System for the Calculation of Changes in Radiological Source Terms with Time

  13. Electricity Advisory Committee Notice of Open Meeting June 11 and 12, 2012:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Register Notice Volume 77, No. 98 - May 21, 2012 | Department of Energy 1 and 12, 2012: Federal Register Notice Volume 77, No. 98 - May 21, 2012 Electricity Advisory Committee Notice of Open Meeting June 11 and 12, 2012: Federal Register Notice Volume 77, No. 98 - May 21, 2012 Electricity Advisory Committee Meeting. This notice announces a meeting of the Electricity Advisory Committee (EAC) on June 11 and 12, 2012. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770)

  14. Electricity Advisory Committee Notice of Open Meeting March 12 and 13,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014: Federal Register Notice Volume 79, No. 37 - February 25, 2014 | Department of Energy 2 and 13, 2014: Federal Register Notice Volume 79, No. 37 - February 25, 2014 Electricity Advisory Committee Notice of Open Meeting March 12 and 13, 2014: Federal Register Notice Volume 79, No. 37 - February 25, 2014 This notice announces a meeting of the Electricity Advisory Committee (EAC) on March 12 and 13, 2014. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public

  15. Appendix A. Notice of Inquiry: Preparation of Report to Congress on

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Price-Anderson Act. 62 Federal Register 68,272 (December 31, 1997) | Department of Energy A. Notice of Inquiry: Preparation of Report to Congress on Price-Anderson Act. 62 Federal Register 68,272 (December 31, 1997) Appendix A. Notice of Inquiry: Preparation of Report to Congress on Price-Anderson Act. 62 Federal Register 68,272 (December 31, 1997) DOE is requesting public comments concerning the continuation or modification of the provisions of the Price-Anderson Act (the "Act").

  16. Electricity Advisory Committee Notice of Open Meeting March 17 and 18, 2016: Federal Register Notice Volume 81, No. 29- February 12, 2016

    Broader source: Energy.gov [DOE]

    This notice announces an open meeting of the Electricity Advisory Committee (EAC) on March 17 and 18, 2016. The Federal Advisory Committee Act (Pub. L. 92–463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.

  17. Electricity Advisory Committee Notice of Open Meeting October 2 and 3, 2013: Federal Register Notice Volume 78, No. 176- September 11, 2013

    Broader source: Energy.gov [DOE]

    This notice announces a meeting of the Electricity Advisory Committee (EAC) on October 2 and 3, 2013. The Federal Advisory Committee Act (Pub. L. 92–463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.

  18. Electricity Advisory Committee Notice of Open Meeting March 17 and 18, 2018: Federal Register Notice Volume 81, No. 29- February 12, 2016

    Broader source: Energy.gov [DOE]

    This notice announces an open meeting of the Electricity Advisory Committee (EAC) on March 17 and 18, 2016. The Federal Advisory Committee Act (Pub. L. 92–463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.

  19. Electricity Advisory Committee Notice of Open Meeting March 26 and 27, 2015: Federal Register Notice Volume 80, No. 31- February 17, 2015

    Broader source: Energy.gov [DOE]

    This notice announces an open meeting of the Electricity Advisory Committee (EAC) on March 26 and 27, 2015. The Federal Advisory Committee Act (Pub. L. 92–463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.

  20. Electricity Advisory Committee Notice of Open Meeting September 29 and 30, 2015: Federal Register Notice Volume 80, No. 171- September 3, 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    This notice announces an open meeting of the Electricity Advisory Committee (EAC) on September 29 and 30, 2015. The Federal Advisory Committee Act (Pub. L. 92–463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.

  1. Electricity Advisory Committee Notice of Open Meeting June 1 & 2, 2016: Federal Register Notice Volume 81, No. 91- May 11, 2016

    Office of Energy Efficiency and Renewable Energy (EERE)

    This notice announces an open meeting of the Electricity Advisory Committee (EAC) on June 1 and 2, 2016. The Federal Advisory Committee Act (Pub. L. 92–463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.

  2. Electricity Advisory Committee Notice of Open Meeting June 29 and 30, 2015: Federal Register Notice Volume 80, No. 99- May 22, 2015

    Broader source: Energy.gov [DOE]

    This notice announces an open meeting of the Electricity Advisory Committee (EAC) on June 29 and 30, 2015. The Federal Advisory Committee Act (Pub. L. 92–463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.

  3. Electricity Advisory Committee Notice of Open Meeting March 5 and 6, 2012: Federal Register Notice Volume 77, No. 35- Feb. 22, 2012

    Broader source: Energy.gov [DOE]

    Electricity Advisory Committee Meeting. This notice announces a meeting of the reestablished Electricity Advisory Committee (EAC) on March 5 and 6, 2012. The Federal Advisory Committee Act (Pub. L....

  4. Notification of Employee Rights under the National Labor Relations Act

    Broader source: Energy.gov [DOE]

    This Flash forwards a draft Federal Acquisition Regulation (FAR) clause, 52.222-40, Notification of Employee Rights under the National Labor Relations Act. Executive Order (EO) 13496, Notification of Employee Rights under Federal Labor Laws, dated January 30,2009, requires contractors and subcontractors to post a notice that informs employees of their rights under Federal labor laws, including the National Labor Relations Act. This Act encourages collective bargaining and protects the exercise by workers of their freedom to associate, to self organize and to designate representatives of their own choosing for the purpose of negotiating the terms and conditions of their employment.

  5. DOE Recovery Act Reporting Requirements for the State Energy Program |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Recovery Act Reporting Requirements for the State Energy Program DOE Recovery Act Reporting Requirements for the State Energy Program U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) State Energy Program (SEP) reporting requirements for states and U.S. territories receiving SEP grants under the 2009 Recovery Act. sep_arra_reporting_requirements.pdf (228.32 KB) More Documents & Publications EECBG Program Notice 10-07A WPN 10-13a:

  6. EA-1900-NOA-FEA-2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SUPPLEMENTARY INFORMATION: In the 77 FR 40023, beginning on page 40023 in the Federal ... call access code number 1876264 to read as follows: call-in number 800-988-9402 ...

  7. EIS-0520: Notice of Intent | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    20: Notice of Intent EIS-0520: Notice of Intent Texas LNG Project; Cameron County, Texas The Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, is preparing an EIS that analyzes the potential environmental impacts of a proposal to construct and operate a natural gas liquefaction and export terminal at the Port of Brownsville Ship Channel in Cameron County, Texas. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the

  8. Notice of Proposed Rulemaking (May 16, 2007) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Proposed Rulemaking (May 16, 2007) Notice of Proposed Rulemaking (May 16, 2007) The Department of Energy proposes policies and procedures applicable to DOE's loan guarantee program authorized by Title XVII of the Energy Policy Act of 2005. Today's proposed rule, when final, also will further the President's Advanced Energy Initiative. Title XVII authorizes the Secretary of Energy to make loan guarantees for projects that ''avoid, reduce, or sequester air pollutants or anthropogenic

  9. EA-2001: Notice of Availability | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Notice of Availability EA-2001: Notice of Availability Energy Efficiency Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings' Baseline Standards Update (RIN 1904-AD39) The U.S. Department of Energy (DOE) is publishing this final rule to implement provisions in the Energy Conservation and Production Act (ECPA) that require DOE to update the baseline Federal energy efficiency performance standards for the construction of new Federal commercial and multi-family

  10. EA-2021: Notice of Availability of the Draft Environmental Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Notice of Availability of the Draft Environmental Assessment EA-2021: Notice of Availability of the Draft Environmental Assessment Energy Conservation Standards for Manufactured Housing (RIN 1904-AC11) Section 413 of the Energy Independence and Security Act of 2007 (EISA) directs DOE to establish energy conservation standards for manufactured housing. This Draft Environmental Assessment and Request for Information on Impacts to Indoor Air Quality evaluates the potential

  11. Plains and Eastern Clean Line Transmission Line: Federal Register Notice,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Volume 80, No. 81 - April 28, 2015 | Department of Energy Federal Register Notice, Volume 80, No. 81 - April 28, 2015 Plains and Eastern Clean Line Transmission Line: Federal Register Notice, Volume 80, No. 81 - April 28, 2015 The Department of Energy (DOE) requests public comment on the first complete application submitted in response to its June 10, 2010 Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 in the Federal

  12. Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    110 Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL15-69-000] Acciona Wind Energy USA LLC v. Midcontinent Independent System Operator, Inc.; Notice of Complaint Take notice that on May 27, 2015, pursuant to section 206 of the Federal Power Act, U.S.C. 824(e) and Rule 206 of the Federal Energy Regulatory Commission's (Commission) Rules of Practice and Procedure, 18 CFR 385.206, Acciona Wind Energy USA

  13. ARM - Recovery Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... In other Recovery Act news, the remote balloon launcher was ... new aerosols observation systems passed acceptance testing ... By moving to the fast-switching dual polarization technology...

  14. EM Recovery Act Performance

    Broader source: Energy.gov [DOE]

    The Office of Environmental Management's (EM) American Recovery and Reinvestment Act Program recently achieved 74 percent footprint reduction, exceeding the originally established goal of 40...

  15. Recovery Act Open House

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    light snacks for those attending. DOE ID Manager Rick Provencher discusses the non-cleanup work that was accomplished with Recovery Act funding. Editorial Date November 15, 2010...

  16. Price-Anderson Act

    Broader source: Energy.gov [DOE]

    The Price-Anderson Act (PAA) provides a system of indemnification for legal liability resulting from a nuclear incident in connection with contractual activity for DOE.

  17. Recovery Act Federal Register Notices | Department of Energy

    Office of Environmental Management (EM)

    March 20, 2015 SGDP Report Now Available: Interoperability of Demand Response Resources Demonstration in NY (February 2015) The Interoperability of Demand Response Resources ...

  18. Recovery Act Federal Register Notices | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    In October 2014, the Electric Power Research Institute (EPRI) and the U.S. Department ... The objective of the project was to develop and demonstrate methodologies to enhance the ...

  19. STATE ENERGY PROGRAM NOTICE 10-003A | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10-003A STATE ENERGY PROGRAM NOTICE 10-003A GUIDANCE ON IMPLEMENTATION OF THE DAVIS-BACON ACT PREVAILING WAGE REQUIREMENTS FOR STATE ENERGY PROGRAM GRANT RECIPIENTS UNDER THE...

  20. Notice of Final Rulemaking | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Rulemaking Notice of Final Rulemaking Revisions to U.S. Department of Energy (DOE) regulations governing compliance with the National Environmental Policy Act (NEPA) were published in the Federal Register on October 13, 2011, and will be effective on November 14. The revision (76 FR 63763) can be viewed using the link below. Final Rule - 76 FR 63763 - Oct 13 2011_0.pdf (297.74 KB) More Documents & Publications Department of Energy Technical Support Document National Environmental

  1. 30-Day Federal Register Notice - Extension

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    30-Day Federal Register Notice - Extension [6450-01-P] DEPARTMENT OF ENERGY Agency Information Collection Extension AGENCY: U.S. Department of Energy. ACTION: Submission for Office of Management and Budget (OMB) review; comment request SUMMARY: The Department of Energy (DOE) has submitted an information collection request to the OMB for extension under the provisions of the Paperwork Reduction Act of 1995. The information collection requests a three-year extension of its {enter the Title of the

  2. 60-DAY Federal Register Notice - Extended

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extension [6450-01-P] DEPARTMENT OF ENERGY Agency Information Collection Extension AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE), pursuant to the Paperwork Reduction Act of 1995), intends to extend for three years, an information collection request with the Office of Management and Budget (OMB). Comments are invited on: (a) whether the extended collection of information is necessary for the proper performance of the functions of

  3. 60-DAY Federal Register Notice - Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper

  4. Letter Response from the Plumbing Manufacturers Institute (PMI), Docket No.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE-2010-BT-NOA-0016 - Notice of Availability of Interpretive Rule on the Applicability of Current Water Conservation Standards for Showerheads | Department of Energy Response from the Plumbing Manufacturers Institute (PMI), Docket No. EERE-2010-BT-NOA-0016 - Notice of Availability of Interpretive Rule on the Applicability of Current Water Conservation Standards for Showerheads Letter Response from the Plumbing Manufacturers Institute (PMI), Docket No. EERE-2010-BT-NOA-0016 - Notice of

  5. CLOSEOUT PROCEDURES FOR RECOVERY ACT GRANTS UNDER THE WEATHERIZATION ASSISTANCE PROGRAM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WEATHERIZATION PROGRAM NOTICE 12-3 EFFECTIVE DATE: October 14, 2011 SUBJECT: CLOSEOUT PROCEDURES FOR RECOVERY ACT GRANTS UNDER THE WEATHERIZATION ASSISTANCE PROGRAM PURPOSE: To issue guidance to Grantees for closeout of grants funded under the American Recovery and Reinvestment Act of 2009 (Recovery Act) in the Department of Energy's (DOE) Weatherization Assistance Program (WAP). SCOPE: The provisions of this guidance apply to Grantees or other entities named in the Notification of Grant Award

  6. ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS PROGRAM NOTICE 10-012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS PROGRAM NOTICE 10-012 ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS PROGRAM NOTICE 10-012 DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS PROGRAM PROJECTS INVOLVING RESIDENTIAL WEATHERIZATION WORK eecbg_guidance_not_using_wap_rates_05062010.pdf (57.2 KB) More Documents & Publications Davis-Bacon Act Wage Rates for ARRA-Funded State Energy Program Projects Involving

  7. DOE Notice of inquiry and request for comment. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of inquiry and request for comment. DOE Notice of inquiry and request for comment. DOE is seeking comment and information from the public to assist in its development of regulations pertaining to section 934 of the Energy Independence and Security Act of 2007 (''Act''). Section 934 addresses how the United States will meet its obligations under the Convention on Supplementary Compensation for Nuclear Damage (''Convention'' or ''CSC'') and, in particular, its obligation to contribute to an

  8. John K. Medici (Acting)

    Office of Energy Efficiency and Renewable Energy (EERE)

    Mr. John K. Medici serves as the (Acting) Deputy Chief Information Officer (OCIO) for Cybersecurity for the Department of Energy (DOE).  He has over 18 years of technical implementation and...

  9. River and Harbors Act

    Broader source: Energy.gov [DOE]

    Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) prohibits the unauthorized obstruction or alteration of any navigable water of the United States.

  10. Freedom of Information Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    S (BPA) - NN-1 Cc: Shay, Don Subject: Request for Corona and Field Effects Program Hi Kim, Pursuant to the Freedom of Information Act, I would like to request a copy of...