Licensing the ACR in the USA - A Status Report  

SciTech Connect

The ACR-700 (ACR) is an evolutionary reactor design, which incorporates the inherent safety features of the Candu products, as well as the successful operating experience of the current Candu 6 reactors. The improvements to the ACR from Candu 6 result in significant reductions in capital and operating costs as well as enhanced safety. AECL Technologies (AECLT, a wholly owned US subsidiary of Atomic Energy of Canada Limited) is the proponent for the ongoing pre-application review of the ACR with the US Nuclear Regulatory Commission (NRC) in the United States. This pre-application review will be completed shortly and will support an application to the USNRC for Standard Design Certification (SDC). AECL Technologies' overall objective for the pre-application review of the ACR is to obtain an understanding of the scope, cost, and the schedule to obtain a Standard Design Certification for the ACR. The pre-application review will address licensing issues associated with the Candu reactor technologies in ACR that depart from the light water reactor, pressure-vessel based regulatory framework in the USA. Therefore, during the course of the ACR pre-application review, major USNRC issues with the ACR design will be identified early and the scope of the work required to address these concerns, along with associated completion schedules, will be formulated and ultimately agreed upon with the USNRC. AECLT has been informed by the NRC staff that the results of their pre-application review will be documented in a Safety Assessment Report (SAR), which will state whether there are any major impediments to licensing the ACR in the United States. In particular, the SAR should provide confirmation of the licensing criteria applicable to the ACR, provide an assessment of the completeness of AECL's Research and Development (R and D) programs that exist or are planned in support of the ACR, provide an assessment of the suitability for purpose of the computer codes used in the safety analysis of the ACR, and provide estimates of the cost and schedule for the remaining scope of the USNRC's efforts on the identified focus topics in preparation for a Design Certification review. This paper will discuss the status of the pre-application review for ACR. (authors)

Snell, Victor; Langman, Vince; Ion, Robert; Reid, Calvin [2251 Speakman Drive, Mississauga, Ontario, L5K 1B2 (Canada)

2004-07-01T23:59:59.000Z

2

ACR-1000 Passive Features  

SciTech Connect

The Advanced CANDU Reactor{sup TM} (ACR{sup TM}) is a Generation III+ pressure tube type reactor using light water coolant and heavy water moderator. The ACR-1000 reactor design is an evolutionary extension of the proven CANDU reactor design. The ACR-1000 incorporates multiple and diverse passive systems for accident mitigation. Where necessary, one or more features that are passive in nature have been included for mitigation of any postulated accident event. This paper describes how the use of passive design elements complements active features enhances reliability and improves safety margins. (authors)

Lekakh, Boris; Hau, Ken; Ford, Steven [Atomic Energy of Canada Ltd. (Canada)

2006-07-01T23:59:59.000Z

3

acres | OpenEI  

Open Energy Info (EERE)

acres acres Dataset Summary Description This dataset is part of a larger internal dataset at the National Renewable Energy Laboratory (NREL) that explores various characteristics of large solar electric (both PV and CSP) facilities around the United States. This dataset focuses on the land use characteristics for solar facilities that are either under construction or currently in operation. Source Land-Use Requirements for Solar Power Plants in the United States Date Released June 25th, 2013 (7 months ago) Date Updated Unknown Keywords acres area average concentrating solar power csp Density electric hectares km2 land land requirements land use land-use mean photovoltaic photovoltaics PV solar statistics Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon Master Solar Land Use Spreadsheet (xlsx, 1.5 MiB)

4

Property:BLM CaseStatus | Open Energy Information  

Open Energy Info (EERE)

BLM CaseStatus BLM CaseStatus Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Property Name BLM CaseStatus Property Type String Description Status of case at most recent import from LR2000. Most of these cases are actually leases. Allows Values Authorized, Cancelled, Closed, Expired, Pending, Rejected, Relinquished, Withdrawn This is a property of type String. The allowed values for this property are: Authorized Cancelled Closed Expired Pending Rejected Relinquished Withdrawn Subproperties This property has the following 5 subproperties: C CACA-005224 N NVN-075549 NVN-076209 NVN-076822 NVN-076825 Pages using the property "BLM CaseStatus" Showing 25 pages using this property. (previous 25) (next 25) A AZA-009168 + Closed + AZA-009169 + Closed + AZA-009170 + Closed +

5

ACR process for ethylene  

SciTech Connect

Describes how the advanced cracking reactor process, which is ready for a logical commercial application, offers total liquids feedstock flexibility from light naphthenes through vacuum gas oils in the same production unit. Several processes are presently being developed which are aimed at maintaining olefin selectivity when cracking the heaviest feeds. Addresses the problems posed by such heavy feedstocks. The following trends favor the ACR process in the 1980s: natural gas price decontrol; limited natural gas reserves; few new domestic LPG-based ethylene plants will be built; an economic recovery will create the need for more ethylene capacity; modest increases in ''real'' crude oil prices; plentiful supplies of vacuum gas oil at prices making it an attractive ethylene feedstock; and increasing supplies of light naphtha at prices making it an attractive ethylene feedstock as well. Predicts that these factors will swing the preferred feedstocks for ethylene manufacture back to crude oil distillates before the end of the decade. Argues that in this environment, the ACR process can deliver the lowest cost ethylene in the industry. ACR has full-range feedstock flexibility, high selectivity to ethylene, and less sensitivity to feedstock costs and co-product credits.

Baldwin, R.L.; Kamm, G.R.

1983-01-01T23:59:59.000Z

6

5.909 Acres W00105030016  

E-Print Network (OSTI)

JEMEZ MORRO BUNKER 430 WETF ANCHOR RANCH V-SITE GUARDIAN W-SMA-1 5.909 Acres 16-017(j)-99W00108020018

7

Economic theory and women's household status: The case of Japan  

Science Journals Connector (OSTI)

Economic development disadvantages wives. Conventional microeconomic theory predicts this. As household incomes rise, wives have incentives to specialize in intangible household production. This may raise total household production according to the theory of comparative advantage, but disproportionately favors husbands in distribution of the gains according to the marginal productivity theory of distribution. Wives may become better off in absolute terms but more dependent financially on their husbands and lose power within the household. Historically, Japanese gender roles became highly specialized and wives legal status declined, although other Meiji-era features protected wives. Policies to improve women's status should address the precise economic problem involved.

Barbara J. Redman

2008-01-01T23:59:59.000Z

8

1.837 Acres W00406010007  

E-Print Network (OSTI)

1612500 1612500 1760100 1760100 XY! 16-026(y) W-SMA-3.5 1.837 Acres HE K-SITE 430 410 360 MORRO BUNKER 411

9

Case Study III: Model overview and status J. A. Cumming  

E-Print Network (OSTI)

. The hydrocarbons are trapped under pressure in the reservoir in an equilibrium state (typically with water more porous media contain more water or hydrocarbons. This is a report to described the general nature of the hydrocarbon reservoir models to be investigated for Case

Oakley, Jeremy

10

ACR 891 (?) Ocean Policy: Current Issues seminar  

E-Print Network (OSTI)

ACR 891 (?) Ocean Policy: Current Issues seminar Fall, 2013 (2 cr, + 1 cr optional) Professor of a common pool resource than the world's oceans it can only be the atmosphere. The latter is currently neglected. This seminar is intended to introduce students to some of the current issues in ocean policy

11

Current Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Current Status Current Status > Content on this page requires a newer version of Adobe Flash Player. Get Adobe Flash player July 31, 1942 The Army Corp of Engineers leases 1,025 acres of the Cook County Forest Preserve to build a research facility. November 1942 Under the direction of Enrico Fermi, a group of scientists at the University of Chicago begin building Chicago Pile-1 (CP-1). Security and secracy were essential. December 2, 1942 Enrico Fermi's team creates the world's first self-sustaining nuclear chain reaction using the CP-1 reactor under Stagg Field at the University of Chicago. CP-1 1943 The experiments under Stagg Field shut down, and the scientists move to a 19 acre section of the leased forest preserve, known as Site A. CP-1 is reconstructed and modified at Site A and renamed Chicago Pile 2 (CP-2).

12

Constructability -- from Qinshan to the ACR  

SciTech Connect

Atomic Energy of Canada Limited (AECL) has recognized the importance of constructability for many years, and it is applying its principals to CANDU projects with increasing success. The CANDU 6 Nuclear Power Plant has been constructed eleven times in the last 25 years. However, the last two units completed on the Qinshan project in China have employed some very innovative construction methods that have not been used on the previous units. In order to make nuclear power generation more competitive, shorter construction schedules and reduced project cost and risks are essential objectives. The application of constructability principles is a major contributor to achieving these objectives. The success of Qinshan has increased the confidence in the new construction methods, which are being implemented on the ACR (Advanced CANDU Reactor) successfully. An ACR construction strategy that utilizes advanced construction techniques has been developed by AECL. The strategy includes paralleling of activities by using extensive modularization and the vertical installation of equipment and modules into the reactor building using a VHL (Very Heavy Lift) crane. This strategy allows short schedules to be met with a minimum risk to the project.

Elgohary, Medhat; Fairclough, Neville; Ricciuti, Rick

2003-09-01T23:59:59.000Z

13

Interior Department to Open 190 Million Acres to Geothermal Power...  

Energy Savers (EERE)

to make more than 190 million acres of federal land in 12 western states available for geothermal energy development. DOI's Final Geothermal Programmatic Environmental Impact...

14

Moral Status  

E-Print Network (OSTI)

Chapters One through Three present the following view: (i) I explain moral status as follows: something has moral status just in case we have reasons not to cause harms to it simply in virtue of the badness of the harms ...

Harman, Elizabeth, 1975-

2003-01-01T23:59:59.000Z

15

E-Print Network 3.0 - acr -lattice checkerboard Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

Medicine 44 PROJECT SUMMARY NAME: McAllis Point Estuarine Habitat Restoration Summary: Galveston CountyTexas ACRES: 75 acres NON-FEDERAL SPONSOR: Texas General Land Office...

16

E-Print Network 3.0 - acr bi-rads mri Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Sciences Summary: Student Research Symposium: May 12, 2005 Fully Automated Quality Assurance for MRI involving ACR... for Use of the MR Phantom for the ACR MRI Accreditation...

17

Interior Department to Open 190 Million Acres to Geothermal Power  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of the Interior (DOI) announced last week that it plans to make more than 190 million acres of federal land in 12 western states available for geothermal energy development.

18

n0052300-4_5 acre.doc  

Office of Legacy Management (LM)

2300 2300 MAC-PIN 25.5.1 Pinellas Environmental Restoration Project Interim Remedial Action Quarterly Progress Report for the Young-Rainey Star Center's 4.5-Acre Site January through March 2002 April 2002 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC02-10 Document Number N0052300 Contents DOE/Grand Junction Office 4.5 Acre Site Interim Remedial Action April 2002 Page iii Contents Acronyms and Abbreviations ........................................................................................................... v 1.0 Introduction ............................................................................................................................1

19

n0055800-4_5 acre.doc  

Office of Legacy Management (LM)

5800 5800 GJO- 2002-379- TAC GJO-PIN 25.5.1 Pinellas Environmental Restoration Project Quarterly Progress Report for the Young - Rainey STAR Center's 4.5 Acre Site July through September 2002 October 2002 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract Number DE-AC13-02GJ79491 Task Order Number ST03-107 Document Number N0055800 Contents DOE/Grand Junction Office 4.5 Acre Site Quarterly Progress Report October 2002 Page iii Contents Acronyms and Abbreviations ........................................................................................................... v 1.0 Introduction ............................................................................................................................1

20

Garden Acres, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Acres, California: Energy Resources Acres, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 37.9638127°, -121.2293895° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.9638127,"lon":-121.2293895,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Warr Acres, Oklahoma: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Warr Acres, Oklahoma: Energy Resources Warr Acres, Oklahoma: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.5225567°, -97.6189304° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.5225567,"lon":-97.6189304,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

22

Bell Acres, Pennsylvania: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Bell Acres, Pennsylvania: Energy Resources Bell Acres, Pennsylvania: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.5900673°, -80.1664479° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.5900673,"lon":-80.1664479,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

23

Waipio Acres, Hawaii: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Waipio Acres, Hawaii: Energy Resources Waipio Acres, Hawaii: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 21.4675°, -158.0163889° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":21.4675,"lon":-158.0163889,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

24

Bethel Acres, Oklahoma: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Bethel Acres, Oklahoma: Energy Resources Bethel Acres, Oklahoma: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.308681°, -97.0255798° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.308681,"lon":-97.0255798,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

25

Derby Acres, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Derby Acres, California: Energy Resources Derby Acres, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.2471875°, -119.5954004° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.2471875,"lon":-119.5954004,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

26

Acres Green, Colorado: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Acres Green, Colorado: Energy Resources Acres Green, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 39.5566551°, -104.8960903° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.5566551,"lon":-104.8960903,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

27

Dustin Acres, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Dustin Acres, California: Energy Resources Dustin Acres, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.2194092°, -119.3906711° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.2194092,"lon":-119.3906711,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

28

China Lake Acres, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Acres, California: Energy Resources Acres, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.6405108°, -117.763955° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.6405108,"lon":-117.763955,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

29

Reile's Acres, North Dakota: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Reile's Acres, North Dakota: Energy Resources Reile's Acres, North Dakota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 46.92252°, -96.862391° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.92252,"lon":-96.862391,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

30

Mountain View Acres, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Acres, California: Energy Resources Acres, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 34.496663°, -117.3489352° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.496663,"lon":-117.3489352,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

31

Valley Acres, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Acres, California: Energy Resources Acres, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.2060764°, -119.406783° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.2060764,"lon":-119.406783,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

32

Ocean Acres, New Jersey: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Acres, New Jersey: Energy Resources Acres, New Jersey: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 39.7434529°, -74.2809757° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7434529,"lon":-74.2809757,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

33

Southwood Acres, Connecticut: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Southwood Acres, Connecticut: Energy Resources Southwood Acres, Connecticut: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 41.962567°, -72.571962° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.962567,"lon":-72.571962,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

34

Conformational change of the AcrR regulator reveals a possible mechanism of induction  

SciTech Connect

The Escherichia coli AcrR multidrug-binding protein represses transcription of acrAB and is induced by many structurally unrelated cytotoxic compounds. The crystal structure of AcrR in space group P222{sub 1} has been reported previously. This P222{sub 1} structure has provided direct information about the multidrug-binding site and important residues for drug recognition. Here, a crystal structure of this regulator in space group P3{sub 1} is presented. Comparison of the two AcrR structures reveals possible mechanisms of ligand binding and AcrR regulation.

Gu, R.; Li, M.; Su, S.-C.; Long, F.; Routh, M.D.; Yang, F.; McDermott, G.; Yu, E.W. (UCSF); (Iowa State)

2008-07-03T23:59:59.000Z

35

Effect of burnup on ACR-700 3-D reactivity devices cross sections  

SciTech Connect

Full core analysis of typical power reactors being generally performed using few groups diffusion theory, it is necessary to generate beforehand, using a lattice code, the required few group cross sections and diffusion coefficients associated with each region in the core. For CANDU-type reactors including the Advanced CANDU Reactor (ACR), the problem is more complex because these reactors contain vertical reactivity devices that are located between two horizontal fuel bundles. The usual calculation scheme relies in this case on a 2-D fuel cell calculation to generate the few group fuel properties and on a 3-D supercell calculation for the analysis of the reactivity devices present in the core. Because of its complexity, the supercell calculations are generally performed using simplified fuel geometries. In this paper, the different stages involved in the reactor physics simulations for ACR will be explained focusing particularly on a study of the burnup dependence of the incremental cross section associated with zone control units (ZCU). The use of these incremental cross sections for finite core calculations will also be presented. (authors)

Dahmani, M.; Marleau, G.; Varin, E. [Institut de Genie Nucleaire, Ecole Polytechnique de Montreal, 2900 Boulevard Edouard-Montpetit, Montreal, Que. H3T 1J4 (Canada)

2006-07-01T23:59:59.000Z

36

The case for a directional dark matter detector and the status of current experimental efforts  

E-Print Network (OSTI)

We present the case for a dark matter detector with directional sensitivity. This document was developed at the 2009 CYGNUS workshop on directional dark matter detection, and contains contributions from theorists and ...

Battat, James

37

Status of household water treatment and safe storage in 45 countries and a case study in Northern India  

E-Print Network (OSTI)

This thesis examines the present of the status of HWTS technologies across the world, and in one location Lucknow, India. The data for the global status of HWTS was collected by contacting the Water, Sanitation and Hygiene ...

Jain, Mehul

2010-01-01T23:59:59.000Z

38

Microsoft Word - N01550_4_5Acre_Jun-Nov 2010 final draft  

Office of Legacy Management (LM)

4.5 Acre Site 4.5 Acre Site June Through November 2010 December 2010 LMS/PIN/N01550 LMS/PIN/N01550 Pinellas Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site June Through November 2010 December 2010 U.S. Department of Energy 4.5 Acre Site Semiannual Progress Report for June Through November 2010 December 2010 Doc. No. N01550 Page i Contents Abbreviations .................................................................................................................................. ii 1.0 Introduction ............................................................................................................................1 1.1 Site Activities ................................................................................................................3

39

E-Print Network 3.0 - acr-1000 central element Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

with the Central... . The Foothill and Piedmont Grassland system shares elements with the Western Great Plains Tallgrass, Central... ,000-10,000 acres 1000-5000 ... Source:...

40

E-Print Network 3.0 - acres international limited Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

Collection: Environmental Sciences and Ecology 92 Using Bookmarks in the 2007 Census of Agriculture PDF April 3, 2009 Summary: . Specified Crops HarvestedBYield per Acre...

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

E-Print Network 3.0 - acres consulting services Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnerships, Agricultural consultants, and Commodity groups worked with NRCS program and county staff... categorized by commodity segment: 60acre for fruitnurseryXmas tree...

42

Body Size, Physical Activity, and Breast Cancer Hormone Receptor Status: Results from Two Case-Control Studies  

Science Journals Connector (OSTI)

...hormone receptor status. We present...participant told us the specific...equivalents of energy expenditure based...progesterone receptor status. Br. J. Cancer...classification of energy costs of human...tumor ER and PR status may provide us with greater...

Shelley M. Enger; Ronald K. Ross; Annlia Paganini-Hill; Catherine L. Carpenter; and Leslie Bernstein

2000-07-01T23:59:59.000Z

43

NVN-090744 | Open Energy Information  

Open Energy Info (EERE)

Acres) Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 560 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

44

NVN-086897 | Open Energy Information  

Open Energy Info (EERE)

Acres) Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 400 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

45

UTU-087777 | Open Energy Information  

Open Energy Info (EERE)

Acres) Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 5094 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

46

AZA-009177 | Open Energy Information  

Open Energy Info (EERE)

(40 Acres) Case Status Closed Case Type GEOLSENONCOMPPRE2005 Total Acreage 2031 Bid PriceAcre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT...

47

OROR-065728 | Open Energy Information  

Open Energy Info (EERE)

Acres) Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 2840 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

48

NVN-077646 | Open Energy Information  

Open Energy Info (EERE)

Acres) Case Status Authorized Case Type GEOLSENONCOMPPRE2005 Total Acreage 80 Bid PriceAcre Managing Field Office none provided Surface Manager TOIYABE NF Lessee 1 GRADIENT...

49

Proliferation Resistance Evaluation of ACR-1000 Fuel with Minor Actinides  

SciTech Connect

The Global Nuclear Energy Partnership (GNEP) program is to significantly advance the science and technology of nuclear energy systems and to enhance the spent fuel proliferation resistance. It consists of both innovative nuclear reactors and innovative research in separation and transmutation. The merits of nuclear energy are high-density energy, with low environmental impacts (i.e. almost zero greenhouse gas emission). Planned efforts involve near-term and intermediate-term improvements in fuel utilization and recycling in current light water reactors (LWRs) as well as the longer-term development of new nuclear energy systems that offer much improved fuel utilization and proliferation resistance, along with continued advances in operational safety. For future advanced nuclear systems, minor actinides (MA) are viewed more as a resource to be recycled, and transmuted to less hazardous and possibly more useful forms, rather than simply disposed of as a waste stream in an expensive repository facility. MAs can play a much larger part in the design of advanced systems and fuel cycles, not only as additional sources of useful energy, but also as direct contributors to the reactivity control of the systems into which they are incorporated. In this work, an Advanced CANDU Reactor (ACR) fuel unit lattice cell model with 43 UO2 fuel rods will be used to investigate the effectiveness of a Minor Actinide Reduction Approach (MARA) for enhancing proliferation resistance and improving the fuel cycle performance. The main MARA objective is to increase the 238Pu / Pu isotope ratio by using the transuranic nuclides (237Np and 241Am) in the high burnup fuel and thereby increase the proliferation resistance even for a very low fuel burnup. As a result, MARA is a very effective approach to enhance the proliferation resistance for the on power refueling ACR system nuclear fuel. The MA transmutation characteristics at different MA loadings were compared and their impact on neutronics criticality assessed. The concept of MARA, significantly increases the 238Pu/Pu ratio for proliferation resistance, as well as serves as a burnable absorber to hold-down the initial excess reactivity. It is believed that MARA can play an important role in atoms for peace and the intermediate term of nuclear energy reconnaissance

Gray S. Chang

2008-09-01T23:59:59.000Z

50

Microsoft Word - N01359_4.5AcreLDA Final Report.doc  

Office of Legacy Management (LM)

Environmental Restoration Project Environmental Restoration Project Interim Remedial Action for Source Removal at the 4.5 Acre Site Final Report September 2009 LMS/PIN/N01359 This page intentionally left blank LMS/PIN/N01359 Pinellas Environmental Restoration Project Interim Remedial Action for Source Removal at the 4.5 Acre Site Final Report September 2009 This page intentionally left blank U.S. Department of Energy Interim Remedial Action for Source Removal at the 4.5 Acre Site-Final Report September 2009 Doc. No. N01359 Page i Contents Abbreviations................................................................................................................................. iii Executive Summary.........................................................................................................................v

51

Microsoft Word - N01308_4 5Acre June-Nov08_psd.doc  

Office of Legacy Management (LM)

Young - Rainey STAR Center's Young - Rainey STAR Center's 4.5 Acre Site June through November 2008 December 2008 LMS/PIN/N01308 LMS/PIN/N01308 Pinellas Environmental Restoration Project Semiannual Progress Report for the Young - Rainey STAR Center's 4.5 Acre Site June through November 2008 December 2008 U.S. Department of Energy 4.5 Acre Site Semiannual Progress Report for June through November 2008 December 2008 Doc. No. N0130800 Page i Contents Acronyms and Abbreviations ......................................................................................................... ii 1.0 Introduction ............................................................................................................................1 1.1 Site Activities................................................................................................................2

52

Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada  

SciTech Connect

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.

NSTec Environmental Restoration

2010-11-22T23:59:59.000Z

53

Microsoft Word - N01215_4_5 Acre IRAP.doc  

Office of Legacy Management (LM)

4.5 Acre Site 4.5 Acre Site July 2008 Office of Legacy Management LMS/PIN/N01215 Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AM01-07LM00060 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy This page intentionally left blank LMS/PIN/N01215 Pinellas Environmental Restoration Project Interim Remedial Action Plan for Source Removal at the 4.5 Acre Site July 2008 This page intentionally left blank U.S. Department of Energy Interim Remedial Action Plan for Source Removal at the 4.5 Acre Site July 2008 Doc. No. N0121500 Page iii Contents Acronyms and Abbreviations .........................................................................................................

54

Jordan's Farm is a 160-acre family farm located in Cape Elizabeth, ME.  

E-Print Network (OSTI)

. Production Jordan's Farm is a conventional agriculture operation. They grow mixed vegetables, and some fruit. They also produce compost and sell soil products, including mulch and aggregates. The farmstead is 160-acres

New Hampshire, University of

55

BLM Finalizes Plans to Open 190 Million Acres to Geothermal Power  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Interior's Bureau of Land Management (BLM) has made official its plans to open more than 190 million acres of federal lands for leasing and potential development of geothermal energy resources.

56

Application for a Temporary Water Use Permit for Up to 10 Acre Feet and Up  

Open Energy Info (EERE)

Up to 10 Acre Feet and Up Up to 10 Acre Feet and Up to One Year Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material: Application for a Temporary Water Use Permit for Up to 10 Acre Feet and Up to One Year Details Activities (0) Areas (0) Regions (0) Abstract: Unavailable Author(s): Unknown Published: TCEQ, Date Unknown Document Number: Unavailable DOI: Unavailable Source: View Original Document Retrieved from "http://en.openei.org/w/index.php?title=Application_for_a_Temporary_Water_Use_Permit_for_Up_to_10_Acre_Feet_and_Up_to_One_Year&oldid=648773" Category: Reference Materials What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

57

EA-1915: Conveyance of Approximately 1,641 Acres of Unimproved Land to the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Conveyance of Approximately 1,641 Acres of Unimproved Land 5: Conveyance of Approximately 1,641 Acres of Unimproved Land to the Tri-City Development Council, the Local Community Reuse Organization, Richland, WA EA-1915: Conveyance of Approximately 1,641 Acres of Unimproved Land to the Tri-City Development Council, the Local Community Reuse Organization, Richland, WA Summary This EA will evaluate the environmental impacts of conveyance of approximately 1,641 acres of unimproved land at DOE's Hanford Site, Richland, Washington to the Tri-City Development Council, the local community reuse organization. Public Comment Opportunities None available at this time. Documents Available for Download September 19, 2012 EA-1915: Notice of Intent to Prepare an Environmental Assessment and Notice of Potential Floodplain and Wetland Involvement

58

Microsoft Word - N01350_4 5Acre Dec-May09.doc  

Office of Legacy Management (LM)

8 through May 2009 8 through May 2009 June 2009 LMS/PIN/N01350 LMS/PIN/N01350 Pinellas Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site December 2008 through May 2009 June 2009 U.S. Department of Energy 4.5 Acre Site Semiannual Progress Report for December 2008 through May 2009 June 2009 Doc. No. N01350 Page i Contents Abbreviations ................................................................................................................................ iii 1.0 Introduction ............................................................................................................................1 1.1 Site Activities................................................................................................................3

59

Microsoft Word - N01514_4 5Acre Dec09-May10.doc  

Office of Legacy Management (LM)

9 through May 2010 9 through May 2010 June 2010 LMS/PIN/N01514 LMS/PIN/N01514 Pinellas Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site December 2009 through May 2010 June 2010 U.S. Department of Energy 4.5 Acre Site Semiannual Progress Report for December 2009 through May 2010 June 2010 Doc. No. N01514 Page i Contents Abbreviations.................................................................................................................................. ii 1.0 Introduction ............................................................................................................................1 1.1 Site Activities................................................................................................................3

60

Status and Trends of Irrigated Agriculture in Texas  

E-Print Network (OSTI)

Status and Trends of Irrigated Agriculture in Texas Irrigation is critical to our food production and food security and is a vital component of Texas' productive agricultural economy.Texas ranks third in the United States in both agricultural acres irrigated and irrigation water applied. Significant advances

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Microsoft Word - N01180_4.5Acre Dec-May08Edited  

Office of Legacy Management (LM)

Center's Center's 4.5 Acre Site December 2007 through May 2008 June 2008 Office of Legacy Management LMS/PIN/N01180 Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AM01-07LM00060 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy LMS/PIN/N01180 Pinellas Environmental Restoration Project Semiannual Progress Report for the Young - Rainey STAR Center's 4.5 Acre Site December 2007 Through May 2008 June 2008 U.S. Department of Energy 4.5 Acre Site Semiannual Progress Report for December 2007 through May 2008 June 2008 Doc. No. N0118000 Page ii Contents Acronyms and Abbreviations ........................................................................................................

62

Quarterly Progress Report for the Young-Rainey STAR Center's 4.5 Acre Site  

Office of Legacy Management (LM)

600 600 GJO-2003-410-TAC GJO-PIN 25.5.1 Pinellas Environmental Restoration Project Quarterly Progress Report for the Young - Rainey STAR Center's 4.5 Acre Site October through December 2002 January 2003 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract Number DE-AC13-02GJ79491 Task Order Number ST03-107 Document Number N0057600 Contents DOE/Grand Junction Office 4.5 Acre Site Quarterly Progress Report January 2003 Page iii Contents Acronyms and Abbreviations ..........................................................................................................v 1.0 Introduction ............................................................................................................................1

63

Modlisation du comportement des neutrons dans un racteur avanc canadien ACR en utilisant les logiciels dvelopps  

E-Print Network (OSTI)

Limited (AECL), portant sur la mise au point de logiciels et de schémas de calcul pour le Advanced Candu des ACR est différente de celle des réacteurs CANDU actuels. La présence simultanée d'eau légère et d des réacteurs CANDU actuels devra être modifiée et améliorée avant de s'adapter au ACR. Nous devrons

Meunier, Michel

64

Microsoft Word - N01797_4_5Acre Semiannual.doc  

Office of Legacy Management (LM)

2 Through May 2013 2 Through May 2013 June 2013 LMS/PIN/N01797 U.S. Department of Energy Pinellas 4.5 Acre Site Semiannual Progress Report for December 2012-May 2013 June 2013 Doc. No. N01797 Page i Contents Abbreviations .................................................................................................................................. ii 1.0 Introduction ............................................................................................................................1 1.1 Site Activities ................................................................................................................3 2.0 Monitoring Data .....................................................................................................................3

65

Microsoft Word - N01716_4_5Acre Dec - May 2012 FINAL DRAFT.doc  

Office of Legacy Management (LM)

1 Through May 2012 1 Through May 2012 June 2012 LMS/PIN/N01716 U.S. Department of Energy 4.5 Acre Site Semiannual Progress Report for December 2011 Through May 2012 June 2012 Doc. No. N01716 Page i Contents Abbreviations .................................................................................................................................. ii 1.0 Introduction ............................................................................................................................1 1.1 Site Activities ................................................................................................................3 2.0 Monitoring Data .....................................................................................................................3

66

FPL's solar stars shine at new 500-acre array By SUSAN SALISBURY  

E-Print Network (OSTI)

FPL's solar stars shine at new 500-acre array By SUSAN SALISBURY Palm Beach Post Staff Writer and water, Florida Power & Light Co. workers finished cleaning the mirrors at its new Martin County solar's dedication of the one-of-a-kind hybrid solar energy center, it's nice that the 5-by-5-foot mirrors

Belogay, Eugene A.

67

Quarterly Progress Report for the Young-Rainey STAR Center's 4.5 Acre Site  

Office of Legacy Management (LM)

3-TAC 3-TAC GJO-PIN 25.5.1 Pinellas Environmental Restoration Project January through March 2003 Quarterly Progress Report for the Young-Rainey STAR Center's 4.5 Acre Site April 2003 Grand Junction Office U.S. Department of Energy Work Performed Under DOE Contract No. for the U.S. Department of Energy DE-AC13-02GJ79491 Approved for public release; distribution is unlimited. N0060800 GJO-2003-433-TAC GJO-PIN 25.5.1 Pinellas Environmental Restoration Project Quarterly Progress Report for the Young - Rainey STAR Center's 4.5 Acre Site January through March 2003 April 2003 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract Number DE-AC13-02GJ79491 Task Order Number ST03-107

68

S M Stoller STAR Center- 4.5 Acre Site, Largo, FL  

Office of Legacy Management (LM)

STAR Center- 4.5 Acre Site, Largo, FL STAR Center- 4.5 Acre Site, Largo, FL 110406202 Accutest Job Number: F25243 Sampling Date: 07/06/04 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D.

69

Microsoft Word - n0075700-4_5 Acre April to June 2004.doc  

Office of Legacy Management (LM)

April Through June 2004 April Through June 2004 July 2004 Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management Office of Legacy Management DOE LM/ 6 2004 - - GJ 94 N0075700 DOE-LM/GJ694-2004 Pinellas Environmental Restoration Project Quarterly Progress Report 4.5 Acre Site April through June 2004 July 2004 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado Document Number N0075700 Contents U.S. Department of Energy 4.5 Acre Site Quarterly Progress Report

70

S M Stoller STAR Center- 4.5 Acre Site, Largo, FL  

Office of Legacy Management (LM)

STAR Center- 4.5 Acre Site, Largo, FL STAR Center- 4.5 Acre Site, Largo, FL 7030-226/Monthly Accutest Job Number: F27168 Sampling Date: 10/05/04 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable.

71

Pinellas Environmental Restoration Project Quarterly Progress Report, 4.5 Acre January through March 2004  

Office of Legacy Management (LM)

January through March 2004 January through March 2004 April 2004 Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management Office of Legacy Management DOE LM/ 645 2004 GJ - - N0074500 DOE-LM/GJ645-2004 Pinellas Environmental Restoration Project Quarterly Progress Report 4.5 Acre Site January through March 2004 April 2004 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado Document Number N0074500 Contents U.S. Department of Energy 4.5 Acre Site Quarterly Progress Report

72

S M Stoller STAR Center- 4.5 Acre Site, Largo, FL  

Office of Legacy Management (LM)

STAR Center- 4.5 Acre Site, Largo, FL STAR Center- 4.5 Acre Site, Largo, FL 110406202 Accutest Job Number: F23552 Sampling Date: 04/20/04 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D.

73

Microsoft Word - n0071500-4_5 Acre Oct to Dec.doc  

Office of Legacy Management (LM)

7-TAC 7-TAC U.S. Department of Energy Pinellas Environmental Restoration Project Quarterly Progress Report 4.5 Acre Site October Through December 2003 January 2004 Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management N0071500 GJO-2004-557-TAC PIN 700.50.10 Pinellas Environmental Restoration Project Quarterly Progress Report 4.5 Acre Site October through December 2003 January 2004 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado

74

Live Status  

NLE Websites -- All DOE Office Websites (Extended Search)

For Users For Users Live Status Global Queue Look Scheduled Outages Outage Log Edison Login Node Status Hopper Login Node Status Hopper User Environment Monitoring Carver Login Node Status PDSF Login Node Status PDSF Monitoring Science Gateway Status Now Computing Highlights My NERSC Getting Started Computational Systems Data & File Systems Network Connections Queues and Scheduling Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612

75

Microsoft Word - DOE_RM_DM-#348500-v1-4_5_Acre_Semiannual_Jan-May_2006.DOC  

Office of Legacy Management (LM)

Center's 4.5 Acre Center's 4.5 Acre Site January through May 2006 June 2006 Office of Legacy Management DOE M/GJ1230-2006 -L Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy DOE-LM/GJ1230-2006 Pinellas Environmental Restoration Project Semiannual Progress Report 4.5 Acre Site January through May 2006 June 2006 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado U.S. Department of Energy 4.5 Acre Site Semiannual Progress Report for January through May 2006

76

Live Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Queue Look Scheduled Outages Outage Log Edison Login Node Status Hopper Login Node Status Hopper User Environment Monitoring Carver Login Node Status PDSF Login Node Status PDSF Monitoring Science Gateway Status Now Computing Highlights My NERSC Getting Started Computational Systems Data & File Systems Network Connections Queues and Scheduling Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov

77

SMARTS status  

NLE Websites -- All DOE Office Websites (Extended Search)

SMARTS INSTRUMENT STATUS SMARTS INSTRUMENT STATUS Instrument Status (Last updated: 2014/01/11 12:06:58) Run Number: 87401 Title: Sample1 Pretested [4.06,150.00,-0.75,45.00] Run Status: running Last Script Activity: 2014/01/11 11:52:36: Start run 87401; mah 1200000 move 4.06 150.00 -0.75 45.00 View full script Next Script Command: mah 1200000 move -0.75 120.00 -0.60 45.00 Proposal#: 4808 Sample#: 977 MAH: 837309 Monitor: 306052 Beam Current: 100 Shutter Status: OPEN Used disk space on /home: 52% Used disk space on /disk2: 74% Crate Status smartsdaq1 smartsdaq2 smartsdaq3 smartsdaq4 smartsdaq5 T0's in Run 16946 16959 16971 16984 16997 T0's Processed 16946 16959 16971 16984 16997 Events 726326 649097 794699 702610 3750460 Events/T0 42.86 38.27 46.83 41.37 220.65

78

NVN-085819X | Open Energy Information  

Open Energy Info (EERE)

(40 Acres) Case Status Authorized Case Type GEOUNITAGREEMENT Total Acreage 7426.1 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF RECLAMATIO Lessee 1...

79

NVN-018423 | Open Energy Information  

Open Energy Info (EERE)

(40 Acres) Case Status Closed Case Type GEOLSECOMPPRE2005 Total Acreage 640 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

80

AZA-009182 | Open Energy Information  

Open Energy Info (EERE)

Acres) Case Status Closed Case Type GEOLSENONCOMPPRE2005 Total Acreage 2010.24 Bid PriceAcre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT...

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

NVN-065561 | Open Energy Information  

Open Energy Info (EERE)

(40 Acres) Case Status Authorized Case Type GEOLSECOMPPRE2005 Total Acreage 360 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

82

NVN-085724 | Open Energy Information  

Open Energy Info (EERE)

(40 Acres) Case Status Closed Case Type GEOLSECOMPPOST2005 Total Acreage 1920 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

83

NVN-011737 | Open Energy Information  

Open Energy Info (EERE)

Acres) Case Status Authorized Case Type GEOLSECOMPPRE2005 Total Acreage 1118.88 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

84

NVN-074855 | Open Energy Information  

Open Energy Info (EERE)

Acres) Case Status Authorized Case Type GEOLEASENONCOMPETITI Total Acreage 933.5 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

85

AZA-009180 | Open Energy Information  

Open Energy Info (EERE)

Acres) Case Status Closed Case Type GEOLSENONCOMPPRE2005 Total Acreage 3032.28 Bid PriceAcre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT...

86

CACA-014407 | Open Energy Information  

Open Energy Info (EERE)

Acres) Case Status Authorized Case Type GEOLSECOMPPRE2005 Total Acreage 2561.25 Bid PriceAcre Managing Field Office none provided Surface Manager INYO NF Lessee 1 ORNI 51 LLC...

87

Automation Status  

NLE Websites -- All DOE Office Websites (Extended Search)

NREL Manufacturing R&D Workshop NREL Manufacturing R&D Workshop NREL H2/FC Manufacturing R&D Workshop Automation Status Garry Sperrick garry@sperkllc.com 585-259-0311 August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Presentation Overview ƒ Brief Introduction ƒ DOE / NREL - Review & Discussion ƒ Automation Platforms ƒ Automation Processes ƒ Automation Considerations of the Manufacturer ƒ Manufacturer and the Supplier ƒ Three (3) Automation Programs Following these Guidelines ƒ Automotive Component Manufacturing ƒ Medical Manufacturing ƒ Membrane Electrode Assembly Manufacturing ƒ Hypothetical Fuel Cell Manufacturing Platforms August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Professional Bio ƒ Automation Technician - Mobil Chemical

88

SRP4760R List of Lots By Purchaser As at :-10-mar-2011:16:09 SHERWOOD (100 Acre)  

E-Print Network (OSTI)

(100 Acre) SHERWOOD (Sydnope Hill) EAST ANGLIA (Gt & Little Bendysh) EAST ANGLIA (Rowney Wood) EAST) SOUTH EAST ENGLAND (Creech) NEW FOREST FD (Turfhill) WEST MIDLANDS (Waverley) WEST MIDLANDS (Haughmond.16 2.17 2.18 2.19 WEST MIDLANDS (Badger Hills) PENINSULA (Halwill North) PENINSULA (Clifford) PENINSULA

89

NVN-076676 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLEASENONCOMPETITI Total Acreage 1420 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

90

NVN-079667 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSENONCOMPPRE2005 Total Acreage 1920 Bid PriceAcre Managing Field Office none provided Surface Manager TOIYABE NF Lessee 1 GRADIENT...

91

NVN-085705 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 1896.28 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF RECLAMATIO Lessee 1...

92

NVN-074196 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSENONCOMPPRE2005 Total Acreage 640 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

93

NVN-077481 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSENONCOMPPRE2005 Total Acreage 1920 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

94

AZA-009171 | Open Energy Information  

Open Energy Info (EERE)

Type 3 Case Status Closed Case Type GEOLSENONCOMPPRE2005 Total Acreage 2520 Bid PriceAcre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT...

95

NVN-079292 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSENONCOMPPRE2005 Total Acreage 1980.23 Bid PriceAcre Managing Field Office none provided Surface Manager TOIYABE NF Lessee 1 GRADIENT...

96

NVN-076300 | Open Energy Information  

Open Energy Info (EERE)

(section) Case Status Authorized Case Type GEOLEASECOMPETITIVE Total Acreage 1280 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

97

NVN-083966 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 5120 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

98

NVN-079307 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSENONCOMPPRE2005 Total Acreage 1280 Bid PriceAcre Managing Field Office none provided Surface Manager TOIYABE NF Lessee 1 GRADIENT...

99

AZA-009174 | Open Energy Information  

Open Energy Info (EERE)

Type 3 Case Status Closed Case Type GEOLSENONCOMPPRE2005 Total Acreage 1820 Bid PriceAcre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT...

100

NVN-080159 | Open Energy Information  

Open Energy Info (EERE)

(section) Case Status Authorized Case Type GEOLEASENONCOMPETITI Total Acreage 640 Bid PriceAcre Managing Field Office none provided Surface Manager TOIYABE NF Lessee 1 NGP BLUE...

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

NVN-085709 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 1280 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

102

UTU-085605 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 2441.53 Bid PriceAcre Managing Field Office none provided Surface Manager FISHLAKE NF Lessee 1 ENEL...

103

NVN-074883 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSENONCOMPPRE2005 Total Acreage 1240 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

104

NVN-079662 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSENONCOMPPRE2005 Total Acreage 1324 Bid PriceAcre Managing Field Office none provided Surface Manager TOIYABE NF Lessee 1 GRADIENT...

105

NVN-077483 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSENONCOMPPRE2005 Total Acreage 2520 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

106

NVN-083483X | Open Energy Information  

Open Energy Info (EERE)

Type Lot Case Status Authorized Case Type GEOUNITAGREEMENT Total Acreage 8550 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

107

Wind Power on Native American Lands: Opportunities, Challenges, and Status (Poster)  

SciTech Connect

The United States is home to more than 700 American Indian tribes and Native Alaska villages and corporations located on 96 million acres. Many of these tribes and villages have excellent wind resources that could be commercially developed to meet their electricity needs or for electricity export. This conference poster for Windpower 2007 describes the opportunities, challenges, and status of wind energy projects on Native American lands in the United States.

Jimenez, A.; Johnson, P. B.; Gough, R.; Robichaud, R.; Flowers, L.; Taylor, R.

2007-06-01T23:59:59.000Z

108

Microsoft Word - DOE_RM_DM-#98971-v1-4_5_Acre_July_-_September_2004.DOC  

Office of Legacy Management (LM)

July Through September 2004 July Through September 2004 October 2004 Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management Office of Legacy Management DOE LM/ 2004 - - GJ750 DOE-LM/GJ750-2004 Pinellas Environmental Restoration Project Quarterly Progress Report 4.5 Acre Site July through September 2004 October 2004 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado U.S. Department of Energy 4.5 Acre Site Quarterly Progress Report for July through September 2004

109

Microsoft Word - DOE_RM_DM-#359195-v1-4_5_Acre_final_Jun-Nov_2006.DOC  

Office of Legacy Management (LM)

through November 2006 through November 2006 December 2006 Office of Legacy Management DOE M/1398 2006 - -L Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy DOE-LM/1398-2006 Pinellas Environmental Restoration Project Semiannual Progress Report 4.5 Acre Site June through November 2006 December 2006 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado U.S. Department of Energy 4.5 Acre Site Semiannual Progress Report for June through November 2006

110

Tevatron status  

SciTech Connect

The Fermilab Tevatron is both the world's highest energy accelerator system and first large-scale superconducting synchrotron. Since Tevatron commissioning in July 1983, the accelerator has operated in 1984, 1985 and 1987 with extracted beams of 800 GeV for three runs of fixed target physics, and in 1987, and 1988, with proton-antiproton colliding beams at 900 /times/ 900 GeV. This paper will focus on the collider operation of the Tevatron: its present status and the outlook for its longer-term future evolution. 18 refs., 3 figs., 2 tabs.

Dugan, G.

1989-03-01T23:59:59.000Z

111

CPP Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Protection Program (CPP) Protection Program (CPP) Status FY10 Jeff Mauth Project Manager May 19, 2010 1 Agenda  Sensor Integration  Sensor Deployment  CPP Portal  Mercury  Parting Comments  Questions 2 Sensor Integration Task Lead: Greg Thomas  Flo and Flower: Session Data  Snort: Network Intrusion Detection Data  AMP: Various Types of Network Data  PopQuiz: Various Types of Network Data  T3: Data Movement and Sensor Control 3 Sensor Deployment Task Lead: Liz Faultersack Certification and Accreditation Continued Expansion Hardware Refresh to Begin FY11 9 CPP Portal Task lead: Brett Didier Features Sharing Policy Data and Releases 13 CPP Portal Provides DOE cyber analysts access to CPP collected "DOE enterprise" data

112

EA-1915: Conveyance of Approximately 1,641 Acres of Unimproved Land to the Tri-City Development Council, the Local Community Reuse Organization, Richland, WA  

Energy.gov (U.S. Department of Energy (DOE))

This EA will evaluate the environmental impacts of conveyance of approximately 1,641 acres of unimproved land at DOEs Hanford Site, Richland, Washington to the Tri-City Development Council (TRIDEC), the local community reuse organization (CRO).

113

Prognostic Impact of P53 Status, TLS-CHOP Fusion Transcript Structure, and Histological Grade in Myxoid Liposarcoma: A Molecular and Clinicopathologic Study of 82 Cases  

Science Journals Connector (OSTI)

...of TLS exons 6-8 in the fusion product. Type 5-2 (also known as type...includes TLS exons 6 and 7 in the fusion, whereas type 8-2 (also known as type...Thus, three major recurrent fusion transcript types have been reported in cases...

Cristina R. Antonescu; Sylvia J. Tschernyavsky; Ramona Decuseara; Denis H. Leung; James M. Woodruff; Murray F. Brennan; Julia A. Bridge; James R. Neff; John R. Goldblum; and Marc Ladanyi

2001-12-01T23:59:59.000Z

114

VPP Participant Status  

Energy.gov (U.S. Department of Energy (DOE))

The VPP Participant Status document lists all the DOE VPP participants and their current status within the VPP Program. Additionally, participant information includes governing program office and estimated number of employees for each participant.

115

Heuristic status polling  

DOE Patents (OSTI)

Methods, compute nodes, and computer program products are provided for heuristic status polling of a component in a computing system. Embodiments include receiving, by a polling module from a requesting application, a status request requesting status of a component; determining, by the polling module, whether an activity history for the component satisfies heuristic polling criteria; polling, by the polling module, the component for status if the activity history for the component satisfies the heuristic polling criteria; and not polling, by the polling module, the component for status if the activity history for the component does not satisfy the heuristic criteria.

Archer, Charles J. (Rochester, MN); Blocksome, Michael A. (Rochester, MN); Heidelberger, Philip (Cortlandt Manor, NY); Kumar, Sameer (White Plains, NY); Parker, Jeffrey J. (Rochester, MN); Ratterman, Joseph D. (Rochester, MN)

2011-06-07T23:59:59.000Z

116

Table 1. Canola 2010 large-plot variety and systems trial at Roseau. Yield, Lb/Acre at Test Wt, Lb/Bu at  

E-Print Network (OSTI)

Table 1. Canola 2010 large-plot variety and systems trial at Roseau. Yield, Lb/Acre at Test Wt, Lb Ready, LL = LibertyLink and CL = Clearfield. 51 Varietal Trials Results Canola Canola (Brassica napus and B. rapa) is a crop developed from oilseed rape by Canadian plant breeders; the first canola variety

Thomas, David D.

117

Evaluation of transuranium isotopes inventory for Candu/ACR standard and SEU spent fuel and the possibility to transmute them  

SciTech Connect

Available in abstract form only. Full text of publication follows: The main disadvantage of nuclear energy is the quantity of long lived radioactive waste produced in a NPP. Transmutation could be one of the solutions to reduce it. Waste transmutation will require a suitable deployment of techniques for spent fuel reprocessing. At present, reprocessing is done by aqueous methods that are very efficient for Pu separation (up to 99.9%). For transmutation applications, new partitioning processes must be developed for minor actinides separation from the high level waste. Although these processes are still very much at the research stage, industrial scale-up will result in the deployment of new, more specific separation techniques for transmutation applications. Partitioning and Transmutation (P and T) techniques could contribute to reduce the radioactive inventory and its associated radio-toxicity. Scientists are looking for ways to drastically reduce both the mass and the radio-toxicity of the nuclear waste to be stored in a deep geological repository, and to reduce the time needed to reach the radioactivity level of the raw material originally used to produce energy. The first stage in the transmutation process is the isotopes inventory formed in the spent fuel. In this paper is made an intercomparison evaluation using WIMS 5B.12 and ORIGEN computer codes. Using these two codes, there is evaluated the isotopes released by a fuel standard from a Candu reactor. Moreover, there is simulated an inventory released by a Candu-SEU reactor and an ACR reactor. (authors)

Ghizdeanu, Elena Nineta; Pavelescu, Alexandru [University Politehnica of Bucharest - Faculty of Power Engineering, 313 Splaiul Independentei, RO-060042, Bucharest 6 (Romania); Balaceanu, Victoria [Institute for Nuclear Research, Campului Str., 1, Mioveni P.O. Box 78, 0300 Pitesti (Romania)

2007-07-01T23:59:59.000Z

118

Top Quark Current Experimental Status  

E-Print Network (OSTI)

Ten years after its discovery at the Tevatron collider, we still know little about the top quark. Its large mass suggests it may play a key role in the mechanism of Electroweak Symmetry Breaking (EWSB), or open a window of sensitivity to new physics related to EWSB and preferentially coupled to it. To determine whether this is the case, precision measurements of top quark properties are necessary. The high statistics samples being collected by the Tevatron experiments during Run II start to incisively probe the top quark sector. This report summarizes the experimental status of the top quark, focusing in particular on the recent measurements from the Tevatron.

A. Juste

2006-03-04T23:59:59.000Z

119

BCDA Machine Status Link  

NLE Websites -- All DOE Office Websites (Extended Search)

Machine Status Link Machine Status Link Version 1.33 (December 2005) David M. Kline. The Machine Status Link (MSL) is responsible for distributing the digitized beam current, injection status, P0 clock, and other statuses over a single fiber to several locations around the Storage Ring. The MRD100 is a VME-based module that is part of the MSL and was specifically designed for the APS. It receives and interprets information from the XMS100 module by means of copper or fiber. Signals from the XMS100 module are sent at a P0 rate (3.667 microseconds). It sends two registers every cycle and all in about 12 cycles. Refer to the ASD website for additional information regarding the MSL. The focus of this page is to provide information of how to configure the MRD100 for a beamline IOC and to discuss the sample IOC

120

Nuclear proliferation status report. Status report  

SciTech Connect

This report contains information concerning the nuclear proliferation status of the following countries: (1) Russia, (2) Ukraine, (3) Belarus, (4) Kazakhstan, (5) Israel, (6) India, (7) Pakistan, (8) South Africa, (9) North Korea, (10) Iraq, (11) Iran, (12) Lybia, (13) Algeria, (14) Syria, (15) Brazil, (16) Argentina, and (17) Taiwan.

NONE

1992-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Alternative Fuels Data Center: Status Update: Requirements Have...  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

case. The following points should help to clarify the current status of E85 equipment testing and procedures at UL. Please read them carefully and share with your stakeholders...

122

Comparison of the morphology of alkalisilica gel formed in limestones in concrete affected by the so-called alkalicarbonate reaction (ACR) and alkalisilica reaction (ASR)  

SciTech Connect

The morphology of alkalisilica gel formed in dolomitic limestone affected by the so-called alkalicarbonate reaction (ACR) is compared to that formed in a siliceous limestone affected by alkalisilica reaction (ASR). The particle of dolomitic limestone was extracted from the experimental sidewalk in Kingston, Ontario, Canada that was badly cracked due to ACR. The siliceous limestone particle was extracted from a core taken from a highway structure in Quebec, affected by ASR. Both cores exhibited marked reaction rims around limestone particles. The aggregate particles were polished and given a light gold coating in preparation for examination in a scanning electron microscope. The gel in the ACR aggregate formed stringers between the calcite crystals in the matrix of the rock, whereas gel in ASR concrete formed a thick layer on top of the calcite crystals, that are of the same size as in the ACR aggregate.

Grattan-Bellew, P.E., E-mail: p.grattan-bellew@sympatico.ca [Materials and Petrographic Research G-B Inc., 472 Edison Avenue, Ottawa, ON, Canada K2A 1T9 (Canada); Chan, Gordon [NRC Construction, Bldg., M20, 1200 Montreal Road, Ottawa, ON, Canada K1A 0R6 (Canada)] [NRC Construction, Bldg., M20, 1200 Montreal Road, Ottawa, ON, Canada K1A 0R6 (Canada)

2013-05-15T23:59:59.000Z

123

REGULATORY STATUS: AOC  

NLE Websites -- All DOE Office Websites (Extended Search)

184 UNIT NAME: Concrete Rubble pile 129) REGULATORY STATUS: AOC LOCATION: Outside plant security south of C-611 Water Treatment Plant. Estimated to be less than 5 cubic feet....

124

Status of Solar Photovoltaics  

Science Journals Connector (OSTI)

Before our discussions on the technical aspects of solar photovoltaics, we will first review the status of solar photovoltaics. This chapter begins with a review on ... known barrier to large-scale deployment of ...

Meng Tao

2014-01-01T23:59:59.000Z

125

Renewables in India : Status and Future Potential  

NLE Websites -- All DOE Office Websites (Extended Search)

Renewables in India : Status and Future Potential Renewables in India : Status and Future Potential Speaker(s): Luis Fernandes Date: July 9, 2007 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Galen Barbose We analyse the status and the trends in the growth of renewables in India. We propose a methodology linking micro-simulation to macro-modelling to obtain technical and economic potential estimates for solar water heaters in residential and commercial and biomass gasifiers for thermal applications in industry. We assess the sustainability of renewables based on the criteria of life cycle cost, net energy ratio, resource constraint and greenhouse gas emissions. The renewable based technologies seem to be sustainable based on all criteria, except the high life cycle cost. In some cases e.g. in wind and biomass based systems land availability may

126

Investigation of the ultrasonic wave influence on magnetic ordering in a 20 x [Fe(20 A)/Cr(12 A)]/MgO layered structure  

SciTech Connect

A 20 x [Fe(20 A)/Cr (12 A)]/MgO structure excited by an ultrasonic wave was investigated by polarized neutron reflectometry. It was found that magnetic domains oscillate and their effective size decreases in weak magnetic fields. In close-to-saturation fields, a magnetic lattice is formed in the layered structure; the interplanar spacings in this lattice change with an increase in the field strength and as a result of the excitation of the structure by an ultrasonic wave.

Aksenov, V. L.; Nikitenko, Yu. V.; Proglyado, V. V.; Khaidukov, Yu. N., E-mail: khaiduk@nf.jinr.ru [Joint Institute for Nuclear Research (Russian Federation); Gavrilov, V. N.; Raitman, E. [Institute of Physical Energetics (Latvia); Bottyan, L.; Nagy, D. L. [Research Institute for Particle and Nuclear Physics (Hungary)

2008-09-15T23:59:59.000Z

127

NVN-084604X | Open Energy Information  

Open Energy Info (EERE)

Lot Case Status Closed Case Type GEOUNITAGREEMENT Total Acreage 15294.14 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 BLM...

128

NVN-076301 | Open Energy Information  

Open Energy Info (EERE)

Lot Case Status Authorized Case Type GEOLEASECOMPETITIVE Total Acreage 2503.7 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

129

NVN-089603 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 4227.26 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

130

UTU-029557 | Open Energy Information  

Open Energy Info (EERE)

Lot Case Status Authorized Case Type GEOLSECOMPPRE2005 Total Acreage 2594.37 Bid PriceAcre Managing Field Office none provided Surface Manager FISHLAKE NF Lessee 1 ENEL...

131

NVN-085726 | Open Energy Information  

Open Energy Info (EERE)

Lot Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 4435.6 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

132

NVN-083929 | Open Energy Information  

Open Energy Info (EERE)

Type Lot Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 4836 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

133

UTU-087776 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 5085.68 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

134

UTU-086755 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 5119.92 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

135

NVN-076823 | Open Energy Information  

Open Energy Info (EERE)

Case Status Closed Case Type GEOLSENONCOMPPRE2005 Total Acreage 1897.2 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

136

NVN-083941 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 1883.64 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

137

NVN-086905 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 1880.48 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

138

UTU-086773 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 4337.48 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

139

NVN-086871 | Open Energy Information  

Open Energy Info (EERE)

Lot Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 3113.88 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

140

NVN-076014 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSENONCOMPPRE2005 Total Acreage 488.64 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

NVN-083933 | Open Energy Information  

Open Energy Info (EERE)

PROT Case Status Authorized Case Type Total Acreage 2,560.00 Bid PriceAcre Managing Field Office BLM Stillwater Field Office Surface Manager BLM Lessee 1 Dusty Miller LLC Lessee 2...

142

NVN-083939 | Open Energy Information  

Open Energy Info (EERE)

Lot Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 2542.64 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

143

NVN-060688 | Open Energy Information  

Open Energy Info (EERE)

Type 1 Case Status Authorized Case Type GEOLEASECOMPETITIVE Total Acreage 1236.75 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

144

UTU-086760 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 1563.92 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

145

AZA-009185 | Open Energy Information  

Open Energy Info (EERE)

Type Lot Case Status Closed Case Type GEOLSENONCOMPPRE2005 Total Acreage 2560.2 Bid PriceAcre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT...

146

NVN-079106 | Open Energy Information  

Open Energy Info (EERE)

Case Status Authorized Case Type GEOLSENONCOMPPRE2005 Total Acreage 2588.75 Bid PriceAcre Managing Field Office none provided Surface Manager TOIYABE NF Lessee 1 ORNI 16...

147

RECOVERY ACT CASE STUDY CHP and district energy serve Texas A&M's 5,200-acre campus, which includes 750 buildings.  

E-Print Network (OSTI)

,000 pounds of steam per hour, and � Campus-wide electrical distribution system upgrades. The CHP system can operate as a baseload system to serve 75% of Texas A&M's peak power needs, 65% of total electrical energy&M's New Power Generation System," Energy Action Plan 2015, Utility & Energy Services, Texas A&M University

148

Automation Status | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Automation Status Automation Status Presented at the NREL Hydrogen and Fuel Cell Manufacturing R&D Workshop in Washington, DC, August 11-12, 2011. mfg2011plenarysperrick.pdf More...

149

Grand valley irrigation return flow case study  

SciTech Connect

Irrigation water supply is furnished annually to about 71,500 acres of land in the Grand Valley of western Colorado. Return flows from that irrigation contribute about 780,000 tpy of salt to the Colorado River, causing an increase of 77 mg/l in the salinity concentration at Imperial Dam. A case study of water quality in this region is focused on: water quality data for irrigation and return flows/ identification of regulations that affect irrigation and return flows/ and a proposed program for controlling salinity levels. (1 map, 9 references, 8 tables)

Keys, J.W.

1981-06-01T23:59:59.000Z

150

Weekly Petroleum Status Report  

U.S. Energy Information Administration (EIA) Indexed Site

Petrolem Reports Petrolem Reports Weekly Petroleum Status Report Data for week ending Dec. 13, 2013 | Release Date: Dec. 18, 2013 | Next Release Date: Dec. 27, 2013 | full report Previous Issues Week: December 18, 2013 December 11, 2013 December 4, 2013 November 27, 2013 November 20, 2013 November 14, 2013 November 6, 2013 October 30, 2013 October 23, 2013 October 21, 2013 October 9, 2013 October 2, 2013 prior issues Go The petroleum supply situation in the context of historical information and selected prices. Released after 10:30 a.m. 1:00 p.m. Highlights Weekly Petroleum Status Report Highlights PDF PDF Data Overview (Combined Table 1 and Table 9) PDF Tables 1 U.S. Petroleum Balance Sheet CSV XLS PDF 2 U.S. Inputs and Production by PAD District CSV XLS PDF

151

Small Business Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact of Teaming Arrangements on Impact of Teaming Arrangements on Small Business Status The Department of Energy is planning to set aside for small businesses a number of acquisitions of a very complex nature, requiring a myriad of capabilities on the part of offerors, which might result in teaming arrangements or joint ventures being formed. Given this, the Department believes that potential offerors should be aware of the Small Business Administration's regulations regarding affiliation. As such, DOE will include the following provision in solicitations where it expects teaming or joint ventures to propose. GUIDANCE FOR PROSPECTIVE OFFERORS - IMPACT OF TEAMING ARRANGEMENTS ON SMALL BUSINESS STATUS (a) This procurement has been set aside for small business. In order to ensure that award

152

Hopper Updates and Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Updates and Status Current Status: Up Open Issues List of known problems, submitted bug reports and issues we are actively working on. Read More » Hopper Featured Announcements A list of key Hopper announcements and system changes. Read More » Hopper Email Announcements Archive An archive of email announcements sent to NERSC users regarding Hopper. Read More » Announcements Hopper OS upgrade and new SW set to default next Wed, Feb 27 21 February 2013, 10:29 am Hopper scheduled maintenance tomorrow (Sept 19) and /project outage 18 September 2012, 4:46 pm Please use "gres" settings in your batch scripts 4 September 2012, 2:03 pm high thruput queue now available on Hopper 30 August 2012, 4:27 pm max walltime for low queue is increased to 24 hrs on Hopper

153

ESnet Planning, Status,  

NLE Websites -- All DOE Office Websites (Extended Search)

ESnet Planning, Status, ESnet Planning, Status, and Future Issues William E. Johnston, ESnet Department Head and Senior Scientist Joe Burrescia, General Manager Mike Collins, Chin Guok, and Eli Dart, Engineering Brian Tierney, Advanced Development Jim Gagliardi, Operations and Deployment Stan Kluz, Infrastructure and ECS Mike Helm, Federated Trust Dan Peterson, Security Officer Gizella Kapus, Business Manager and the rest of the ESnet Team wej@es.net, this talk is available at www.es.net Energy Sciences Network Lawrence Berkeley National Laboratory Networking for the Future of Science ASCAC, August 2008 2 DOE Office of Science and ESnet - the ESnet Mission * ESnet is an Office of Science ("SC") facility in the Office of Advanced Scientific Computing Research ("ASCR")

154

Application for Research Affiliate Associate & Student Status...  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Affiliate Program Application for Research Affiliate Associate & Student Status Application for Research Affiliate Associate & Student Status The following application...

155

National Hydrogen Learning Demonstration Status | Department...  

Energy Savers (EERE)

Hydrogen Learning Demonstration Status National Hydrogen Learning Demonstration Status Download presentation slides from the Fuel Cell Technologies Program webinar "National...

156

Status of JUPITER Program  

SciTech Connect

To obtain the data necessary for evaluating the nuclear design method of a large-scale fast breeder reactor, criticality tests with a large- scale homogeneous reactor were conducted as part of a joint research program by Japan and the U.S. Analyses of the tests are underway in both countries. The purpose of this paper is to describe the status of this project.

Inoue, T.; Shirakata, K.; Kinjo, K.; Ikegami, T.; Yamamoto, M.

1981-03-10T23:59:59.000Z

157

MARS Flight Engineering Status  

SciTech Connect

The Multi-sensor Airborne Radiation Survey Flight Engineering project (MARS FE) has designed a high purity germanium (HPGe) crystal array for conducting a wide range of field measurements. In addition to the HPGe detector system, a platform-specific shock and vibration isolation system and environmental housing have been designed to support demonstration activities in a maritime environment on an Unmanned Surface Vehicle (USV). This report describes the status of the equipment as of the end of FY09.

Fast, James E.; Dorow, Kevin E.; Morris, Scott J.; Thompson, Robert C.; Willett, Jesse A.

2010-04-06T23:59:59.000Z

158

oombs farm is located in Fremont, NH. Karen and Phil Coombs own 16 acres, and lease 60  

E-Print Network (OSTI)

. Practices The Icelandic Sheep are grass fed, and the pigs are pasture raised. Coombs farm is in the process Farm: Planning and Preparedness TM Sustainability Briefings are a collection of occasional essays, thought pieces, case studies and research briefings through which University of New Hampshire (UNH

New Hampshire, University of

159

EA-1999: Proposal to Permit 750 Acres at the Savannah River Site for Use by the State of South Carolina Military Department  

Energy.gov (U.S. Department of Energy (DOE))

This EA will evaluate the potential environmental impacts from a proposal by South Carolina Military Department (SCMD) to permit the use of 750 acres at SRS for military training exercises and permanent facilities to support training. This proposal, if implemented, would further the purposes of the Memorandum of Understanding between the U.S. Department of the Army and DOE concerning the Use of SRS Lands for Military Training Activities, signed in 2007. SCMD has requested permitting two tracts of land, one near B-Area and one west of L-Lake and north of South Carolina Route 125, to establish facilities for military training purposes. SCMD does not propose to conduct live-fire training or to use tracked vehicles at SRS.

160

Distributed Generation Status Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 DOE Peer Review Presentation 0 DOE Peer Review Presentation © Chevron 2010 CERTS Microgrid Demonstration with Large scale Energy Storage & Renewable Generation November 5, 2010 Presented By: Craig Gee, Project Manager (for Mr. Eduardo Alegria - Principal Investigator) Energy Solutions November 2010 DOE Peer Review Presentation © Chevron 2010 Agenda * Introduction - Who we are * Project Team & Site * Project Purpose & Objectives * Project Impacts * System Elements * Project Status * Research Elements * Recent Developments in California * Questions & Comments November 2010 DOE Peer Review Presentation © Chevron 2010 Chevron Energy Solutions Designed & Implemented over 900 Projects in the U.S.  Chevron ES, a division of Chevron USA, Inc. is committed to delivering economically & environmentally advantageous green

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

CHEF: a status report  

SciTech Connect

CHEF refers both to a framework and to an interactive application emphasizing accelerator optics calculations. The framework supports multiple domains of applications: e.g. nonlinear analysis, perturbation theory, and tracking. Its underlying philosophy is to provide an infrastructure with minimum hidden implicit assumptions, general enough to facilitate both routine and specialized computational tasks, and to minimize the duplication of necessary, complex bookkeeping tasks. CHEF was already described in recent conferences. This paper is a status report on recent developments, including issues related to applications to high energy linacs.

Ostiguy, J.-F.; Michelotti, L.; /Fermilab

2007-06-01T23:59:59.000Z

162

Status of Climate Change  

E-Print Network (OSTI)

Status of Climate Change 2013 CaTee Conference San Antonio 2013 ESL-KT-13-12-56 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Menu for Today IPCC 2013: Assessment Report #5 Facts about Climate Change... Who will Win, Who will Lose What Needs to be Done ESL-KT-13-12-56 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 IPCC #5 No great surprises - Sharper language Uncertainties are still large Essentially...

North, G.

2013-01-01T23:59:59.000Z

163

Model Validation Status Review  

SciTech Connect

The primary objective for the Model Validation Status Review was to perform a one-time evaluation of model validation associated with the analysis/model reports (AMRs) containing model input to total-system performance assessment (TSPA) for the Yucca Mountain site recommendation (SR). This review was performed in response to Corrective Action Request BSC-01-C-01 (Clark 2001, Krisha 2001) pursuant to Quality Assurance review findings of an adverse trend in model validation deficiency. The review findings in this report provide the following information which defines the extent of model validation deficiency and the corrective action needed: (1) AMRs that contain or support models are identified, and conversely, for each model the supporting documentation is identified. (2) The use for each model is determined based on whether the output is used directly for TSPA-SR, or for screening (exclusion) of features, events, and processes (FEPs), and the nature of the model output. (3) Two approaches are used to evaluate the extent to which the validation for each model is compliant with AP-3.10Q (Analyses and Models). The approaches differ in regard to whether model validation is achieved within individual AMRs as originally intended, or whether model validation could be readily achieved by incorporating information from other sources. (4) Recommendations are presented for changes to the AMRs, and additional model development activities or data collection, that will remedy model validation review findings, in support of licensing activities. The Model Validation Status Review emphasized those AMRs that support TSPA-SR (CRWMS M&O 2000bl and 2000bm). A series of workshops and teleconferences was held to discuss and integrate the review findings. The review encompassed 125 AMRs (Table 1) plus certain other supporting documents and data needed to assess model validity. The AMRs were grouped in 21 model areas representing the modeling of processes affecting the natural and engineered barriers, plus the TSPA model itself Description of the model areas is provided in Section 3, and the documents reviewed are described in Section 4. The responsible manager for the Model Validation Status Review was the Chief Science Officer (CSO) for Bechtel-SAIC Co. (BSC). The team lead was assigned by the CSO. A total of 32 technical specialists were engaged to evaluate model validation status in the 21 model areas. The technical specialists were generally independent of the work reviewed, meeting technical qualifications as discussed in Section 5.

E.L. Hardin

2001-11-28T23:59:59.000Z

164

UCPath Project Status Report Report Date September 7, 2012 Project Director  

E-Print Network (OSTI)

this transition. Project Status Project Management Start Date Finish Date Status Decisions, Issues and Risks 1 areas have been completed. The Management Workgroup has agreed to begin preliminary planning to convert the case management/knowledge management tool. The UCPath PMO has completed initial mapping of entry

Talley, Lynne D.

165

Fuel Cell Development Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Development Status Michael Short Systems Engineering Manager United Technologies Corporation Research Center Hamilton Sundstrand UTC Power UTC Fire & Security Fortune 50 corporation $52.9B in annual sales in 2009 ~60% of Sales are in building technologies Transportation Stationary Fuel Cells Space & Defense * Fuel cell technology leader since 1958 * ~ 550 employees * 768+ Active U.S. patents, more than 300 additional U.S. patents pending * Global leader in efficient, reliable, and sustainable fuel cell solutions UTC Power About Us PureCell ® Model 400 Solution Process Overview Power Conditioner Converts DC power to high-quality AC power 3 Fuel Cell Stack Generates DC power from hydrogen and air 2 Fuel Processor Converts natural gas fuel to hydrogen

166

DFC Technology Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Pinakin Patel Pinakin Patel Mohammad Farooque FuelCell Energy, Inc. 3 Great Pasture Road Danbury, Ct 06813 DFC Technology Status * Distributed generation puts power where it's needed * Increases power reliability * Near zero emissions allow units to be sited almost anywhere - even polluted urban areas * Reduces need for central generation plants * Reduces grid congestion and need for new transmission lines * Distributed generation enables smart grid * Balances the grid with 24/7 power * Meets requirements for low carbon technology * Smaller projects enable faster permitting, financing, and execution DFC power plant is an enabler for broad distributed generation 600 kW at M&L Commodities Distributed Generation FuelCell Energy Products Fuel Cell Stack DFC300 Single Module

167

RIA Overview and Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Science Office of Science U.S. Department of Energy Guy Savard Argonne National Laboratory & University of Chicago Based on Material presented at the ATLAS Operation's Review December 8-10, 2003 by The Californium Source Upgrade 2 Pioneering Science and Technology Office of Science U.S. Department of Energy 12/8-10/2003 ATLAS Upgrade Guy Savard ATLAS Status * ATLAS only low-energy accelerator for stable ions operating as a User Facility with well documented characteristics (reliability, beam quality, transmission, timing,...) * Excellent and varied physics program with a large User community * What lies ahead for ATLAS * Maintain position as premier low-energy heavy ion accelerator * Address open physics/technical questions leading to RIA * Help the community in the "pre-RIA"

168

Radiation physics and shielding codes and analyses applied to design-assist and safety analyses of CANDU{sup R} and ACR{sup TM} reactors  

SciTech Connect

This paper discusses the radiation physics and shielding codes and analyses applied in the design of CANDU and ACR reactors. The focus is on the types of analyses undertaken rather than the inputs supplied to the engineering disciplines. Nevertheless, the discussion does show how these analyses contribute to the engineering design. Analyses in radiation physics and shielding can be categorized as either design-assist or safety and licensing (accident) analyses. Many of the analyses undertaken are designated 'design-assist' where the analyses are used to generate recommendations that directly influence plant design. These recommendations are directed at mitigating or reducing the radiation hazard of the nuclear power plant with engineered systems and components. Thus the analyses serve a primary safety function by ensuring the plant can be operated with acceptable radiation hazards to the workers and public. In addition to this role of design assist, radiation physics and shielding codes are also deployed in safety and licensing assessments of the consequences of radioactive releases of gaseous and liquid effluents during normal operation and gaseous effluents following accidents. In the latter category, the final consequences of accident sequences, expressed in terms of radiation dose to members of the public, and inputs to accident analysis, e.g., decay heat in fuel following a loss-of-coolant accident, are also calculated. Another role of the analyses is to demonstrate that the design of the plant satisfies the principle of ALARA (as low as reasonably achievable) radiation doses. This principle is applied throughout the design process to minimize worker and public doses. The principle of ALARA is an inherent part of all design-assist recommendations and safety and licensing assessments. The main focus of an ALARA exercise at the design stage is to minimize the radiation hazards at the source. This exploits material selection and impurity specifications and relies heavily on experience and engineering judgement, consistent with the ALARA philosophy. Special care is taken to ensure that the best estimate dose rates are used to the extent possible when applying ALARA. Provisions for safeguards equipment are made throughout the fuel-handling route in CANDU and ACR reactors. For example, the fuel bundle counters rely on the decay gammas from the fission products in spent-fuel bundles to record the number of fuel movements. The International Atomic Energy Agency (IAEA) Safeguards system for CANDU and ACR reactors is based on item (fuel bundle) accounting. It involves a combination of IAEA inspection with containment and surveillance, and continuous unattended monitoring. The spent fuel bundle counter monitors spent fuel bundles as they are transferred from the fuelling machine to the spent fuel bay. The shielding and dose-rate analysis need to be carried out so that the bundle counter functions properly. This paper includes two codes used in criticality safety analyses. Criticality safety is a unique phenomenon and codes that address criticality issues will demand specific validations. However, it is recognised that some of the codes used in radiation physics will also be used in criticality safety assessments. (authors)

Aydogdu, K.; Boss, C. R. [Atomic Energy of Canada Limited, Sheridan Science and Technology Park, Mississauga, Ont. L5K 1B2 (Canada)

2006-07-01T23:59:59.000Z

169

PROVOST CHALLENGE OVERVIEW STATUS REPORT  

E-Print Network (OSTI)

PROVOST CHALLENGE OVERVIEW STATUS REPORT December 2013 # Project Status Project Name · Project Lead report) Joyce O'Halloran and Rachel Webb, The Fariborz Maseeh Department of Mathematics and Statistics 54 ON SCHEDULE Online Academic Advising & Career Development Modules. (Link to detailed report) Mary Ann Barham

Lafferriere, Gerardo

170

ARM - Value-Added Products - Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Process Status Software Status Status Updated On Notes Released Version SGP C1 Green led Running Green led Released 2012-08-06 SGP.C1 (Lamont, OK) 1997-2009 v2.0:...

171

Machine Status | Argonne Leadership Computing Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

User Support User Support Machine Status Presentations Training & Outreach User Survey Machine Status Science on Mira Cores Core Hours Catalyst 65536 114771.01226563 Large scale...

172

Do changes in traditional coronary heart disease risk factors over time explain the association between socio-economic status and coronary heart disease?  

E-Print Network (OSTI)

case-control study. Heart 2009, Franks P, Tancredi DJ,status in coronary heart disease risk estimation. Ann Famstatus and coronary heart disease risk prediction. JAMA

Franks, Peter; Winters, Paul C; Tancredi, Daniel J; Fiscella, Kevin A

2011-01-01T23:59:59.000Z

173

ANAIS: Status and prospects  

E-Print Network (OSTI)

ANAIS experiment will look for dark matter annual modulation with large mass of ultra-pure NaI(Tl) scintillators at the Canfranc Underground Laboratory (LSC), aiming to confirm the DAMA/LIBRA positive signal in a model-independent way. Two 12.5 kg each NaI(Tl) crystals provided by Alpha Spectra are currently taking data at the LSC. Present status of ANAIS detectors background and general performance is summarized; in particular, thanks to the high light collection efficiency prospects of lowering the threshold down to 1 keVee are reachable. Crystal radiopurity goals are fulfilled for $^{232}$Th and $^{238}$U chains and $^{40}$K activity, although higher than original goal, could be accepted; however, high $^{210}$Pb contamination out-of-equilibrium has been identified. More radiopure detectors are being built by Alpha Spectra. The ongoing high quantum efficiency PMT tests and muon veto characterization are also presented. Finally, the sensitivity of the experiment for the annual modulation in the WIMP signal,...

Amar, Julio; Cuesta, Clara; Garca, Eduardo; Ginestra, Carlos; Martnez, Mara; Olivn, Miguel A; Ortigoza, Ysrael; de Solrzano, Alfonso Ortz; Pobes, Carlos; Puimedn, Jorge; Sarsa, Mara Luisa; Villar, Jos ngel; Villar, Patricia

2015-01-01T23:59:59.000Z

174

Status of Oregon's Bull Trout.  

SciTech Connect

Limited historical references indicate that bull trout Salvelinus confluentus in Oregon were once widely spread throughout at least 12 basins in the Klamath River and Columbia River systems. No bull trout have been observed in Oregon's coastal systems. A total of 69 bull trout populations in 12 basins are currently identified in Oregon. A comparison of the 1991 bull trout status (Ratliff and Howell 1992) to the revised 1996 status found that 7 populations were newly discovered and 1 population showed a positive or upgraded status while 22 populations showed a negative or downgraded status. The general downgrading of 32% of Oregon's bull trout populations appears largely due to increased survey efforts and increased survey accuracy rather than reduced numbers or distribution. However, three populations in the upper Klamath Basin, two in the Walla Walla Basin, and one in the Willamette Basin showed decreases in estimated population abundance or distribution.

Buchanan, David V.; Hanson, Mary L.; Hooton, Robert M.

1997-10-01T23:59:59.000Z

175

CT head-scan dosimetry in an anthropomorphic phantom and associated measurement of ACR accreditation-phantom imaging metrics under clinically representative scan conditions  

SciTech Connect

Purpose: To measure radiation absorbed dose and its distribution in an anthropomorphic head phantom under clinically representative scan conditions in three widely used computed tomography (CT) scanners, and to relate those dose values to metrics such as high-contrast resolution, noise, and contrast-to-noise ratio (CNR) in the American College of Radiology CT accreditation phantom.Methods: By inserting optically stimulated luminescence dosimeters (OSLDs) in the head of an anthropomorphic phantom specially developed for CT dosimetry (University of Florida, Gainesville), we measured dose with three commonly used scanners (GE Discovery CT750 HD, Siemens Definition, Philips Brilliance 64) at two different clinical sites (Walter Reed National Military Medical Center, National Institutes of Health). The scanners were set to operate with the same data-acquisition and image-reconstruction protocols as used clinically for typical head scans, respective of the practices of each facility for each scanner. We also analyzed images of the ACR CT accreditation phantom with the corresponding protocols. While the Siemens Definition and the Philips Brilliance protocols utilized only conventional, filtered back-projection (FBP) image-reconstruction methods, the GE Discovery also employed its particular version of an adaptive statistical iterative reconstruction (ASIR) algorithm that can be blended in desired proportions with the FBP algorithm. We did an objective image-metrics analysis evaluating the modulation transfer function (MTF), noise power spectrum (NPS), and CNR for images reconstructed with FBP. For images reconstructed with ASIR, we only analyzed the CNR, since MTF and NPS results are expected to depend on the object for iterative reconstruction algorithms.Results: The OSLD measurements showed that the Siemens Definition and the Philips Brilliance scanners (located at two different clinical facilities) yield average absorbed doses in tissue of 42.6 and 43.1 mGy, respectively. The GE Discovery delivers about the same amount of dose (43.7 mGy) when run under similar operating and image-reconstruction conditions, i.e., without tube current modulation and ASIR. The image-metrics analysis likewise showed that the MTF, NPS, and CNR associated with the reconstructed images are mutually comparable when the three scanners are run with similar settings, and differences can be attributed to different edge-enhancement properties of the applied reconstruction filters. Moreover, when the GE scanner was operated with the facility's scanner settings for routine head exams, which apply 50% ASIR and use only approximately half of the 100%-FBP dose, the CNR of the images showed no significant change. Even though the CNR alone is not sufficient to characterize the image quality and justify any dose reduction claims, it can be useful as a constancy test metric.Conclusions: This work presents a straightforward method to connect direct measurements of CT dose with objective image metrics such as high-contrast resolution, noise, and CNR. It demonstrates that OSLD measurements in an anthropomorphic head phantom allow a realistic and locally precise estimation of magnitude and spatial distribution of dose in tissue delivered during a typical CT head scan. Additional objective analysis of the images of the ACR accreditation phantom can be used to relate the measured doses to high contrast resolution, noise, and CNR.

Brunner, Claudia C.; Stern, Stanley H.; Chakrabarti, Kish [U.S. Food and Drug Administration, 10903 New Hampshire Avenue, Silver Spring, Maryland 20993 (United States)] [U.S. Food and Drug Administration, 10903 New Hampshire Avenue, Silver Spring, Maryland 20993 (United States); Minniti, Ronaldo [National Institute of Standards and Technology, 100 Bureau Drive, Gaithersburg, Maryland 20899 (United States)] [National Institute of Standards and Technology, 100 Bureau Drive, Gaithersburg, Maryland 20899 (United States); Parry, Marie I. [Walter Reed National Military Medical Center, 8901 Rockville Pike, Bethesda, Maryland 20889 (United States)] [Walter Reed National Military Medical Center, 8901 Rockville Pike, Bethesda, Maryland 20889 (United States); Skopec, Marlene [National Institutes of Health, 9000 Rockville Pike, Bethesda, Maryland 20892 (United States)] [National Institutes of Health, 9000 Rockville Pike, Bethesda, Maryland 20892 (United States)

2013-08-15T23:59:59.000Z

176

Industrial demand side management status report: Synopsis  

SciTech Connect

Industrial demand side management (DSM) programs, though not as developed or widely implemented as residential and commercial programs, hold the promise of significant energy savings-savings that will benefit industrial firms, utilities and the environment. This paper is a synopsis of a larger research report, Industrial Demand Side Management. A Status Report, prepared for the US Department of Energy. The report provides an overview of and rationale for DSM programs. Benefits and barriers are described, and data from the Manufacturing Energy Consumption Survey are used to estimate potential electricity savings from industrial energy efficiency measures. Overcoming difficulties to effective program implementation is worthwhile, since rough estimates indicate a substantial potential for electricity savings. The report categorizes types of DSM programs, presents several examples of each type, and explores elements of successful programs. Two in-depth case studies (of Boise Cascade and of Eli Lilly and Company) illustrate two types of effective DSM programs. Interviews with staff from state public utility commissions indicate the current thinking about the status and future of industrial DSM programs. Finally, the research report also includes a comprehensive bibliography, a description of technical assistance programs, and an example of a methodology for evaluating potential or actual savings from projects.

Hopkins, M.E.F.; Conger, R.L.; Foley, T.J.; Parker, J.W.; Placet, M.; Sandahl, L.J.; Spanner, G.E.; Woodruff, M.G.; Norland, D.

1995-08-01T23:59:59.000Z

177

Industrial demand side management: A status report  

SciTech Connect

This report provides an overview of and rationale for industrial demand side management (DSM) programs. Benefits and barriers are described, and data from the Manufacturing Energy Consumption Survey are used to estimate potential energy savings in kilowatt hours. The report presents types and examples of programs and explores elements of successful programs. Two in-depth case studies (from Boise Cascade and Eli Lilly and Company) illustrate two types of effective DSM programs. Interviews with staff from state public utility commissions indicate the current thinking about the status and future of industrial DSM programs. A comprehensive bibliography is included, technical assistance programs are listed and described, and a methodology for evaluating potential or actual savings from projects is delineated.

Hopkins, M.F.; Conger, R.L.; Foley, T.J. [and others

1995-05-01T23:59:59.000Z

178

Geothermal electric power plant status  

SciTech Connect

A status summary of the activity for the 44 proposed geothermal electric power plants in the United States as of March 31, 1981 is presented, as well as the power on-line electric plants to date. The information comes from the Department of Energy Geothermal Progress Monitor System (DOE, 1981).

Murphy, M.; Entingh, D.J.

1981-10-01T23:59:59.000Z

179

ESnet Network Measurement Current Status  

E-Print Network (OSTI)

1 ESnet Network Measurement Current Status Joe Metzger Jan 24th 2008 ESCC meeting Energy SciencesSONAR collaboration focused on dynamic hybrid network issues ­ publication, visualization, and analysis of dynamic Architecture ­ Protocols based on the Open Grid Forum Network Measurement Working Group Schemas · Several

180

Advanced Collaborative Emissions Study (ACES): Phase 2 Status...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

: Phase 2 Status Report Advanced Collaborative Emissions Study (ACES): Phase 2 Status Report Discusses status of ACES, a cooperative multi-party effort to characterize emissions...

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Status of Hydrogen Storage Technologies | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Current Technology Status of Hydrogen Storage Technologies Status of Hydrogen Storage Technologies The current status in terms of weight, volume, and cost of various hydrogen...

182

WIPP Status Update | Department of Energy  

Office of Environmental Management (EM)

from May 14-16, 2013 in Buffalo, NY. WIPP Status Update More Documents & Publications EIS-0026-SA-08: Supplemental Analysis Waste Isolation Pilot Plant Status and Plans - 2010...

183

Webinar: National Hydrogen Learning Demonstration Status  

Energy.gov (U.S. Department of Energy (DOE))

Video recording and text version of the webinar, "National Hydrogen Learning Demonstration Status," originally presented on February 6, 2012.

184

3Compliance Status 2004 SITE ENVIRONMENTAL REPORT  

E-Print Network (OSTI)

3-1 3Compliance Status 2004 SITE ENVIRONMENTAL REPORT DRAFT Brookhaven National Laboratory (BNL County Department of Health Services. Thirty reportable spills of petroleum products or antifreeze status #12;3-22004 SITE ENVIRONMENTAL REPORT CHAPTER 3: COMPLIANCE STATUS DRAFT 3.2.2 New or Modified

185

Status and Future of TRANSCOM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steve Casey Steve Casey U.S. Dept. of Energy Carlsbad Field Office  Current Program status g  Upcoming Changes  Glimpse at future options  DOE Commitments 2 6/3/2010 2  Current Program status g * Computer Based Training * User Support Site * Program Support * Program Accomplishments U i Ch  Upcoming Changes  Glimpse at future options  DOE Commitments 3  1 st release - December 2009 9  Covers general user training  Allows organizations access to training without waiting for a traditional class  Computer security module to be added Autumn 2010 Autumn 2010  Shipper/Scheduler training - being considered 4 6/3/2010 3  Completely overhauled in p y 2009  Features are user friendly  Layout more intuitive

186

Weekly Petroleum Status Report Schedule  

Gasoline and Diesel Fuel Update (EIA)

Weekly Petroleum Status Report Weekly Petroleum Status Report Release Schedule The wpsrsummary.pdf, overview.pdf, and Tables 1-14 in CSV and XLS formats, are released to the Web site after 10:30 a.m. (Eastern Time) on Wednesday. All other PDF and HTML files are released to the Web site after 1:00 p.m. (Eastern Time) on Wednesday. Appendix D is produced during the winter heating season, which extends from October through March of each year. For some weeks which include holidays, releases are delayed by one day. Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Wednesdays with the following exceptions. All times are Eastern. Data for the week ending Alternate Release Date Release Day Release Time Holiday October 11, 2013 October 21, 2013 Monday 10:30 a.m. Columbus/EIA Closed

187

Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Department of Energy Identity, Credential, and Access Management (ICAM) Cyber Security Training Conference Tuesday, May 18, 2010 Office of the Chief Information Officer 2 Announcement * LACS Birds-of-a-Feather Session - Logistics * Wednesday, May 19, 2010 * 9:30 AM - 11:30 AM EST * Room A708 - Focus: LACS ONLY! * LACS implementation experiences, lessons, questions, challenges, etc - Everyone is welcome * Science Identity Federation (Risk Management Track) - Logistics * Tuesday, May 18, 2010 * 4:00 PM - 5:00 PM EST * Room A704 - Focus * Ties into NSF/NIH InCommon Federation * Federated identity solution for Level 1 authentication Office of the Chief Information Officer 3 Slight Change of Focus Credential Issuance Facility Office of the Chief Information Officer 4 Paradigm Shift

188

Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Finalized 030310 002 030210 030210 Direct Requesting copies of Consultation and cooperative Agreement between the Department of Energy and the State of New Mexico with...

189

Status  

NLE Websites -- All DOE Office Websites (Extended Search)

9 FOIA - Request Log 9 FOIA - Request Log 1 Closed/ Date No. Dated Date Rec'd HQ or Dir. Subject Finalized 05/19/09 001 04/07/09 04/07/09 Direct Current contracts with Visionary Solutions, LLC and CAST Specialty Transportation Incorporated, for transportation services for the Waste Isolation Pilot Plant (WIPP) Finalized 06/30/09 002 06/29/09 06/29/09 Transfer DOE/HQ (1) All documents dated from February 2001 to the present relating or referring to any labor disputes that have delayed completion of federal construction projects costing $25 million or more during the time period referenced above. (2) All documents dated from February 2001 to the present relating or referring to any difficulties asserted by contractors in predicting labor cost and/or interruptions

190

DOE Workshop - Deposition Velocity Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delivering DOE's Vision for the Delivering DOE's Vision for the East Tennessee Technology Park Mission Safely Delivering the Department of Energy's Vision for the East Tennessee Technology Park Mission DOE Workshop Deposition Velocity Status Mike Hitchler, Manager Nuclear Facility Safety June 5, 2012 Safely Delivering DOE's Vision for the East Tennessee Technology Park Mission Existing UCOR Analyses * UCOR facilities at East Tennessee Technology Park (ETTP) and Oak Ridge National Laboratory (ORNL) use various plume models depending on when they were developed and by whom. - Some use MACCS or MACCS2 for dispersion evaluation. (~5 locations) - LLLW uses ingestion modeling (multiple locations)

191

Status of Charm Flavor Physics  

E-Print Network (OSTI)

The role of charm in testing the Standard Model description of quark mixing and CP violation through measurements of lifetimes, decay constants and semileptonic form factors is reviewed. Together with Lattice QCD, charm has the potential this decade to maximize the sensitivity of the entire flavor physics program to new physics. and pave the way for understanding physics beyond the Standard Model at the LHC in the coming decade. The status of indirect searches for physics beyond the Standard Model through charm mixing, CP-violation and rare decays is also reported.

I. Shipsey

2006-07-26T23:59:59.000Z

192

Status of the GRANIT facility  

E-Print Network (OSTI)

The GRANIT facility is a follow-up project, which is motivated by the recent discovery of gravitational quantum states of ultracold neutrons. The goal of the project is to approach the ultimate accuracy in measuring parameters of such quantum states and also to apply this phenomenon and related experimental techniques to a broad range of applications in particle physics as well as in surface and nanoscience studies. We overview the current status of this facility, the recent test measurements and the nearest prospects.

Damien Roulier; Francis Vezzu; Stefan Baessler; Benot Clment; Daniel Morton; Valery Nesvizhevsky; Guillaume Pignol; Dominique Rebreyend

2014-10-06T23:59:59.000Z

193

Foreign Obligations Implementation Status Presentation  

National Nuclear Security Administration (NNSA)

January 13, 2004 Crowne Plaza Ravinia Atlanta, January 13, 2004 Crowne Plaza Ravinia Atlanta, January 13, 2004 Crowne Plaza Ravinia Atlanta, Georgia Georgia Obligations Accounting Implementation Workshop Obligations Accounting Implementation Workshop Foreign Obligations Implementation Status Brian G. Horn U.S. Nuclear Regulatory Commission January 13, 2004 Obligations Accounting Implementation Workshop January 13, 2 Obligations Accounting Implementation Workshop January 13, 2004 Crowne Plaza Ravinia Atlanta, GA 004 Crowne Plaza Ravinia Atlanta, GA Overview of Meeting Overview of Meeting * Review how the Obligation Tracking System is working * Presentations: - Review of Government notification procedures - Establishment of the beginning Obligation Balances for sites

194

Oil shale: Technology status report  

SciTech Connect

This report documents the status of the US Department of Energy's (DOE) Oil Shale Program as of the end of FY 86. The report consists of (1) a status of oil shale development, (2) a description of the DOE Oil Shale Program, (3) an FY 86 oil shale research summary, and (4) a summary of FY 86 accomplishments. Discoveries were made in FY 86 about the physical and chemical properties and behavior of oil shales, process chemistry and kinetics, in situ retorting, advanced processes, and the environmental behavior and fate of wastes. The DOE Oil Shale Program shows an increasing emphasis on eastern US oil shales and in the development of advanced oil shale processing concepts. With the award to Foster Wheeler for the design of oil shale conceptual plants, the first step in the development of a systems analysis capability for the complete oil shale process has been taken. Unocal's Parachute Creek project, the only commercial oil shale plant operating in the United States, is operating at about 4000 bbl/day. The shale oil is upgraded at Parachute Creek for input to a conventional refinery. 67 refs., 21 figs., 3 tabs.

Not Available

1986-10-01T23:59:59.000Z

195

UESC Status Data Collection and Analysis  

Energy.gov (U.S. Department of Energy (DOE))

Presentation covers the UESC status data collection and analysis, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

196

Current Status and Potential Future Developments for  

E-Print Network (OSTI)

in response to public concern about tropical deforestation and demand for an international woodCurrent Status and Potential Future Developments for Forest Certification Richard P. Vlosky

197

Special Status Species | Open Energy Information  

Open Energy Info (EERE)

Species Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleSpecialStatusSpecies&oldid647804" Category: NEPA Resources...

198

Status of State Electric Industry Restructuring Activity  

Reports and Publications (EIA)

Presents an overview of the status of electric industry restructuring in each state. Restructuring means that a monopoly system of electric utilities has been replaced with competing sellers.

2010-01-01T23:59:59.000Z

199

Status of French flaw evaluation procedures  

SciTech Connect

The RSE-M Code is under development in France and the 1996 edition will include a complete flaw evaluation procedure for operating PWRs. For FBRs the authors have developed the RCC-MR for design and they are now developing RSE-MR rules for operating plants; a first set of flaw evaluation rules are proposed in the A16 document for low and high temperature regime. After some comments on the organization of RSE and RCC Committees, the paper presents: (1) the status of the different French code rules (RSE-M and A16 document); (2) how can one take into consideration some complex geometry or loading case situations; (3) some comparisons with ASME Code-Section XI; and (4) few examples of major on-going developments for flaw evaluation for different components. In conclusion, two different sets of rules are under development one in RSE-M for PWRs and one in RSE-MR for FBRs using partly the A16 proposals. These rules have to remain consistent, but not necessary identical due to the specific components covered by these documents. The components can be very different in term of pressure load, operating temperature, transient thermal loads and seismic loads.

Faidy, C. [Electricite de France-SEPTEN, Villeurbanne (France); Barthelet, B. [Electricite de France-EPN, Paris La Defense (France); Drubay, B. [CEA CEN Saclay, Gif-sur-Yvette (France)

1996-12-01T23:59:59.000Z

200

RenewableS 2011 GLOBAL STATUS REPORT  

E-Print Network (OSTI)

__20112011 RenewableS 2011 GLOBAL STATUS REPORT Full Report at: http://www.ren21.net/Portals/97/documents/GSR/REN21_GSR2011.pdf #12;11 Changes in renewable energy markets, investments, industries, and policies have been so rapid in recent years that perceptions of the status of renewable energy can lag

Kostic, Milivoje M.

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Green Sturgeon (Acipenser medirostris) Status Review Update  

E-Print Network (OSTI)

Green Sturgeon (Acipenser medirostris) Status Review Update Biological Review Team Santa Cruz Status of Green Sturgeon 1 3. Key Questions in ESA Determination 3 a. The "Species" Question 3 b. The Extinction Risk Question 4 c. "A significant portion of the species' range" issue 4 Recently Updated Green

202

Status of (US) high energy physics networking  

Science Journals Connector (OSTI)

The current status of networking to and between computers used by the high energy physics community is discussed. Particular attention is given to developments over the last year and to future prospects. Comparison between the current status and that of two years ago indicates that considerable strides have been made but that much remains to be done to achieve an acceptable level of functionality.

H.E. Montgomery

1987-01-01T23:59:59.000Z

203

Status of (US) High Energy Physics Networking  

SciTech Connect

The current status of Networking to and between computers used by the High Energy Physics community is discussed. Particular attention is given to developments over the last year and to future prospects. Comparison between the current status and that of two years ago indicates that considerable strides have been made but that much remains to be done to achieve an acceptable level of functionality.

Montgomery, H.E.

1987-02-01T23:59:59.000Z

204

Body Weight Status, Inflammation, and Prognostic Markers in Early-Stage Prostate Cancer  

E-Print Network (OSTI)

Body Weight Status, Inflammation, and Prognostic Markers in Early-Stage Prostate Cancer Brown Bag (UICCC) IHRP Fellow #12;Outline Relative risk of cancer mortality in obese men Pathophysiologic basis for excess risk The case for inflammation/immunity in prostate cancer Preliminary results from

Illinois at Chicago, University of

205

Merton's Status Exchange Theory and Husband-Wife Education Differences in Black Intermarriage  

E-Print Network (OSTI)

........................................................................................................ 86 REFERENCES ................................................................................................................. 88 vii LIST OF FIGURES Page Figure 5-1. Histogram of Husband-Wife Education Difference Residuals... that a white womans black husband does so. These findings would suggest status exchange support for black men, not black women. In their case, endogamous intermarriage is taking place where the level of education is similar among black-white marriages...

Malone, Danny E.

2013-10-23T23:59:59.000Z

206

Property:FacilityStatus | Open Energy Information  

Open Energy Info (EERE)

FacilityStatus FacilityStatus Jump to: navigation, search Property Name FacilityStatus Property Type String Description Status of the energy generation facility Allows Values Proposed;Under Construction;In Service;Decommissioned Pages using the property "FacilityStatus" Showing 25 pages using this property. (previous 25) (next 25) 3 3-D Metals + In Service + A AB Tehachapi Wind Farm + In Service + AFCEE MMR Turbines + In Service + AG Land 1 + In Service + AG Land 2 + In Service + AG Land 3 + In Service + AG Land 4 + In Service + AG Land 5 + In Service + AG Land 6 + In Service + AVTEC + In Service + Adair Wind Farm I + In Service + Adair Wind Farm II + In Service + Adams Wind Project + In Service + Aegir II + Proposed + Aero Turbine + In Service + Aeroman Repower Wind Farm + In Service +

207

Partnership status and the human sex ratio at birth  

Science Journals Connector (OSTI)

...information about the parent's household status before the child's...parent's marital status, household type, ethnicity, age and...grade completed, black and Hispanic ethnicity, dummy variables...analysis. The coefficient for household status is therefore interpretable...

2004-01-01T23:59:59.000Z

208

Intermediate Ethanol Blends: Plans and Status | Department of...  

Energy Savers (EERE)

Intermediate Ethanol Blends: Plans and Status Intermediate Ethanol Blends: Plans and Status Presentation from the U.S. DOE Office of Vehicle Technologies "Mega" Merit Review 2008...

209

Status and Progress in Research, Development and Demonstration...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Status and Progress in Research, Development and Demonstration of Hydrogen-Compressed Natural Gas Vehicles in China Status and Progress in Research, Development and Demonstration...

210

Joint Maintenance Status Report of Potomac Electric Power Company...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM...

211

Goal Practice & Experience : Status Quo and Future for Industrial...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Goal Practice & Experience : Status Quo and Future for Industrial Scale Biomass Energy Development in China Goal Practice & Experience : Status Quo and Future for Industrial Scale...

212

Fuel Quality and Metering: Current Status and Future Needs |...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Quality and Metering: Current Status and Future Needs Fuel Quality and Metering: Current Status and Future Needs These slides were presented at the Onboard Storage Tank...

213

Status Update: Extended Storage and Transportation Waste Confidence...  

Office of Environmental Management (EM)

Status Update: Extended Storage and Transportation Waste Confidence Status Update: Extended Storage and Transportation Waste Confidence Presentation made by David W. Pstrak for the...

214

UNIT NAME C-611 PCB Spill Site REGULATORY STATUS CERCLA  

NLE Websites -- All DOE Office Websites (Extended Search)

79 UNIT NAME C-611 PCB Spill Site REGULATORY STATUS CERCLA LOCATION C-611 Transformer area (Map location 79) APPROXIMATE DIMENSIONS FUNCTION Spill Site OPERATIONAL STATUS NA DATES...

215

Status Prospects of Green Data Center | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status Prospects of Green Data Center Status Prospects of Green Data Center Information on energy-saving technology research of green data centers and the potential impacts....

216

Waste Isolation Pilot Plant Status and Plans - 2010 | Department...  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant Status and Plans - 2010 Waste Isolation Pilot Plant Status and Plans - 2010 Overview of WIPP presented by Dr. Dave Moody. Waste Isolation Pilot Plant...

217

Status Report, Department of Energy - March 2006 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status Report, Department of Energy - March 2006 March 2006 Report on Safety System Engineer and Oversight Programs This report provides a status of the implementation of safety...

218

PEM Stack Manufacturing: Industry Status  

NLE Websites -- All DOE Office Websites (Extended Search)

© 2009 BALLARD POWER SYSTEMS INC. ALL RIGHTS RESERVED © 2009 BALLARD POWER SYSTEMS INC. ALL RIGHTS RESERVED JULY 2009 B U I L D I N G A C L E A N E N E R G Y G R O W T H C O M P A N Y B A L L A R D P O W E R S Y S T E M S PEM Stack Manufacturing: Industry Status Duarte R. Sousa, PE August 11, 2011 AUGUST 2009 P A G E 2 Overview of PEM Stack Manufacturing MEA Manufacturing Plate Manufacturing Stack Assembly Stack Conditioning and Testing Package and Ship For each of the four main processes, the following will be provided: 1. A brief history of where we have been; 2. Where we are today; 3. Where we would like to transition to; 4. Gaps and proposals. AUGUST 2009 P A G E 3 PEM Stack Manufacturing: Cost Overview * The MEA was readily identified as the major cost driver in a 10 kW stationary stack. * The precious metal catalyst electrode is the major cost driver for the MEA.

219

Current status of Japanese detectors  

E-Print Network (OSTI)

Current status of TAMA and CLIO detectors in Japan is reported in this article. These two interferometric gravitational-wave detectors are being developed for the large cryogenic gravitational wave telescope (LCGT) which is a future plan for detecting gravitational wave signals at least once per year. TAMA300 is being upgraded to improve the sensitivity in low frequency region after the last observation experiment in 2004. To reduce the seismic noises, we are installing new seismic isolation system, which is called TAMA Seismic Attenuation System, for the four test masses. We confirmed stable mass locks of a cavity and improvements of length and angular fluctuations by using two SASs. We are currently optimizing the performance of the third and fourth SASs. We continue TAMA300 operation and R&D studies for LCGT. Next data taking in the summer of 2007 is planned. CLIO is a 100-m baseline length prototype detector for LCGT to investigate interferometer performance in cryogenic condition. The key features of CLIO are that it locates Kamioka underground site for low seismic noise level, and adopts cryogenic Sapphire mirrors for low thermal noise level. The first operation of the cryogenic interferometer was successfully demonstrated in February of 2006. Current sensitivity at room temperature is close to the target sensitivity within a factor of 4. Several observation experiments at room temperature have been done. Once the displacement noise reaches at thermal noise level of room temperature, its improvement by cooling test mass mirrors should be demonstrated.

Daisuke Tatsumi; Ryutaro Takahashi; Koji Arai; Noriyasu Nakagawa; Kazuhiro Agatsuma; Toshitaka Yamazaki; Mitsuhiro Fukushima; Masa-Katsu Fujimoto; Akiteru Takamori; Alessandro Bertolini; Virginio Sannibale; Riccardo DeSalvo; Szabolcs Marka; Masaki Ando; Kimio Tsubono; Tomomi Akutsu; Kazuhiro Yamamoto; Hideki Ishitsuka; Takashi Uchiyama; Shinji Miyoki; Masatake Ohashi; Kazuaki Kuroda; Norichika Awaya; Nobuyuki Kanda; Akito Araya; Souichi Telada; Takayuki Tomaru; Tomiyoshi Haruyama; Akira Yamamoto; Nobuaki Sato; Toshitaka Suzuki; Takakazu Shintomi

2007-04-22T23:59:59.000Z

220

Status of the WIPP Project  

SciTech Connect

The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been constructed to be a repository for transuranic (TRU) radioactive wastes generated from the US defense activities. In order to use WIPP as a repository for permanent disposal of TRU waste, the US Department of Energy (DOE) has to demonstrate compliance with the Standards for the Management and Disposal of Spent Nuclear Fuel, High Level and Transuranic Radioactive Wastes'' promulgated by the US Environmental Protection Agency (EPA) in the US Code of Federal Regulations 40 CFR Part 191. The DOE initially plans to perform experiments with a small quantity of waste at WIPP and would like to bring additional quantities for operational demonstration'', before determining whether WIPP is to be a repository for permanent disposal. There are serious problems in pursuing this course of action from an operational point of view. It would be wiser to take the actions necessary to decide whether the facility should be used as a permanent repository, before emplacing a substantial quantity of waste in it. This report evaluates the status of the WIPP Project as of February 1991. 22 refs.

Neill, R.H.; Chaturvedi, L.

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

EVOLUTIONARY STATUS OF 85 PEGASI  

SciTech Connect

We have investigated the evolutionary status of the visual binary 85 Peg (HD 224930) using a high-resolution spectroscopic analysis and the astrometric calibration of the stellar parameters. In spite of well-determined stellar parameters from HIPPARCOS astrometry and from spectroscopy, 85 Peg has for a long time revealed peculiar properties when attempts have been made to combine an evolutionary model with observation. There has been a chronic problem of the mass ratio of the two components when comparing 85 Peg's dynamical properties to the photometric magnitude difference. Moreover, 85 Peg has been suspected to have unique characteristics in its chemical composition. In order to determine accurate spectroscopic abundances, we have obtained high-resolution echelle spectra for 85 Peg. From our elemental analysis, we found that 85 Peg is alpha-enhanced with respect to the scaled solar abundance by a factor of 2. We then produced, within the framework of the standard stellar theory, grids of stellar model using the most recent observational results. To avoid many-fold degeneracy among physical quantities, a statistical minimization test was carried out between theoretical model grids. Enforcing consistency between the modeling and statistical constraints, we derived a reliable set of physical parameters and confirmed the trinarity of the system. In the context of asteroseismology, the theoretical frequency spectrum of 85 Peg was calculated. 85 Peg A is expected to have a first order spacing {Delta}{nu} {approx} 165 {mu}Hz at the reference frequency {nu}{sub 0} = 790 {mu}Hz.

Bach, K.; Kim, Y.-C. [Department of Astronomy, Yonsei University, Seoul 120-749 (Korea, Republic of); Lee, J. [The Astrophysical Research Center for the Structure and Evolution of the Cosmos, Sejong University, Seoul 143-747 (Korea, Republic of); Demarque, P., E-mail: khbach@galaxy.yonsei.ac.k, E-mail: yckim@yonsei.ac.k, E-mail: jdlee.selab@gmail.co, E-mail: pierre.demarque@yale.ed [Department of Astronomy, Yale University, P.O. Box 208101, New Haven, CT 06520-8101 (United States)

2009-09-20T23:59:59.000Z

222

Status of fission yield evaluations  

SciTech Connect

Very few yield compilations are also evaluations, and very few contain an extensive global library of measured data and extensive models for unmeasured data. The earlier U.K. evaluations and US evaluations were comparable up to the retirements of the primary evaluators. Only the effort in the US has been continued and expanded. The previous U.K. evaluations have been published. In this paper we summarize the current status of the US evaluation, philosophy, and various integral yield tests for 34 fissioning nuclides at one or more neutron incident energies and/or for spontaneous fission. Currently there are 50 yield sets and for each we have independent and cumulative yields and uncertainties for approximately 1100 fission products. When finalized, the recommended data will become part of the next version of the US Evaluated Nuclear Data File (ENDF/B-VI). The complete set of data, including the basic input of measured yields, will be issued as a sequel to the General Electric evaluation reports (better known by the authors' names: Rider - or earlier - Meek and Rider). 16 references.

England, T.R.; Rider, B.F.

1983-01-01T23:59:59.000Z

223

SNS Operating Status | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

SNS Operating Status Alerts SNS Operating Status Alerts Receive updates about the SNS beam status via text messages to your cell phone and/or e-mail by signing up here. The instrument hall coordinators will communicate any significant beam status changes including beam start, beam down, planned and unplanned outages, and unanticipated schedule changes such as delays. On the registration, enter your e-mail address to receive e-mail updates or to receive text messages enter the information below that is specific to your cell phone provider: Carrier Email to SMS Gateway Alltel [10-digit phone number]@message.alltel.com Example:1234567890@message.alltel.com AT&T (formerly Cingular) [10-digit phone number]@txt.att.net [10-digit phone number]@mms.att.net (MMS) [10-digit phone number]@cingularme.com

224

Class of 2007 Career Status Survey  

E-Print Network (OSTI)

..................................................24-26 II. Salary Statistics (Full-Time Employment Only): Starting Salaries...........................................................4 Summary Statistics..................................................................................5 Employment and Post-Baccalaureate Program Status by Major at Wittenberg......6 Employment and Post

Bogaerts, Steven

225

Class of 2009 Career Status Survey  

E-Print Network (OSTI)

..................................................22-24 II. Salary Statistics (Full-Time Employment Only): Starting Salaries...........................................................4 Summary Statistics..................................................................................5 Employment and Post-Baccalaureate Program Status by Major at Wittenberg......6 Employment and Post

Bogaerts, Steven

226

Class of 2010 Career Status Survey  

E-Print Network (OSTI)

..................................................23-25 II. Salary Statistics (Full-Time Employment Only): Starting Salaries...........................................................4 Summary Statistics..................................................................................5 Employment and Post-Baccalaureate Program Status by Major at Wittenberg......6 Employment and Post

Bogaerts, Steven

227

Class of 2008 Career Status Survey  

E-Print Network (OSTI)

..................................................22-24 II. Salary Statistics (Full-Time Employment Only): Starting Salaries...........................................................4 Summary Statistics..................................................................................5 Employment and Post-Baccalaureate Program Status by Major at Wittenberg......6 Employment and Post

Bogaerts, Steven

228

UNIT NAME : KOW STANDPIPE REGULATORY STATUS: AOC  

NLE Websites -- All DOE Office Websites (Extended Search)

093 UNIT NUMBER: 182 Pg 1 of 2 UNIT NAME : KOW STANDPIPE REGULATORY STATUS: AOC LOCATION: Outside plant security fence, southwest of C-611. 3 feet high by 3 feet in diameter....

229

Requirements & Status for Volume Fuel Cell Manufacturing  

E-Print Network (OSTI)

Requirements & Status for Volume Fuel Cell Manufacturing DOE Hydrogen Program, Washington, DC July ­Eliminate components, parts and process steps ­Standardize core components across products ­Standardize non-core

230

PKIX Certificate Status in Hybrid MANETs  

Science Journals Connector (OSTI)

Certificate status validation is a hard problem in general but it is particularly complex in Mobile Ad-hoc Networks (MANETs) because we require solutions to manage both the lack of fixed infrastructure inside the...

Jose L. Muoz; Oscar Esparza; Carlos Gan

2009-01-01T23:59:59.000Z

231

National Hydrogen Learning Demonstration Status (Presentation)  

SciTech Connect

This presentation discusses U.S. DOE Learning Demonstration Project goals, fuel cell vehicle and H2 station deployment status, and technical highlights of vehicle and infrastructure analysis results and progress.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

2012-02-01T23:59:59.000Z

232

The Status of Solar Thermal Electric Technology  

Science Journals Connector (OSTI)

Solar thermal electric technology was evaluated as a future source of power for United States utilities. The technology status was developed using an ... configuration was selected for each of the major solar col...

Richard J. Holl; Edgar A. DeMeo

1990-01-01T23:59:59.000Z

233

Status of the MAJORANA DEMONSTRATOR experiment  

SciTech Connect

The MAJORANA DEMONSTRATOR neutrinoless double beta-decay experiment is currently under construction at the Sanford Underground Research Facility in South Dakota, USA. An overview and status of the experiment are given.

Martin, R. D. [Nuclear Science Division, Lawrence Berkeley National Laboratory, Berkeley, CA, USA and Department of Physics, University of South Dakota, Vermillion, SD (United States); Abgrall, N.; Chan, Y-D.; Hegai, A.; Mertens, S.; Poon, A. W. P.; Vetter, K. [Nuclear Science Division, Lawrence Berkeley National Laboratory, Berkeley, CA (United States); Aguayo, E.; Fast, J. E.; Hoppe, E. W.; Kouzes, R. T.; LaFerriere, B. D.; Orrell, J. L.; Overman, N. R.; Soin, A. [Pacific Northwest National Laboratory, Richland, WA (United States); Avignone III, F. T. [Department of Physics and Astronomy, University of South Carolina, Columbia, SC, USA and Oak Ridge National Laboratory, Oak Ridge, TN (United States); Barabash, A. S.; Konovalov, S. I.; Yumatov, V. [Institute for Theoretical and Experimental Physics, Moscow (Russian Federation); Bertrand, F. E. [Oak Ridge National Laboratory, Oak Ridge, TN (United States); and others

2014-06-24T23:59:59.000Z

234

CESA-1 Heliostat Field Evaluation Status Report  

Science Journals Connector (OSTI)

This paper describes the status of the evaluation activities of the CESA-1 Heliostat Field. The Heliostat field is composed of three hundred heliostats of two different types (CASA-II and...

Fernando Snchez

1985-01-01T23:59:59.000Z

235

Chemistry of nuclear fuel reprocessing: Current status  

Science Journals Connector (OSTI)

Current status on the chemical aspects of nuclear fuel reprocessing is presented with special emphasis on the Purex process which continues to be the process of choice for the last four decades. Better deconta...

D. D. Sood; S. K. Patil

1996-03-01T23:59:59.000Z

236

Status of Heavy-lepton Searches  

DOE R&D Accomplishments (OSTI)

Searches for heavy leptons using e{sup +}e{sup -} annihilation, lepton-hadron collisions, photon-hadron collisions, hadron-hadron collisions, and studies of macroscopic matter are reviewed. The present experimental status and future possibilities are summarized.

Perl, M. L.

1981-06-00T23:59:59.000Z

237

Structure formation: Models, Dynamics and Status  

E-Print Network (OSTI)

The constraints on the models for the structure formation arising from various cosmological observations at different length scales are reviewed. The status of different models for structure formation is examined critically in the light of these observations.

T. Padmanabhan

1995-08-25T23:59:59.000Z

238

CANDU safety-status and direction  

SciTech Connect

This paper reviews the status and direction of Canada deuterium uranium (CANDU) safety design for the current CANDU product line, with emphasis on the single-unit containment plants.

Snell, V.G.; Allen, P.J. (Atomic Energy of Canada Limited, Sheridan Park (Canada))

1993-01-01T23:59:59.000Z

239

status of the latest research and development  

NLE Websites -- All DOE Office Websites (Extended Search)

status of the latest research and development (R&D) activities. In status of the latest research and development (R&D) activities. In addition, the website, which is accessible from the NETL homepage, contains updated material on the program's Core R&D, Infrastructure, and Global Collaborations elements; a modified Frequently Asked Questions (FAQ) section; a section highlighting the National Carbon Sequestration Database and Geographic Information System

240

HVAC Commissioning - A Status Report in Taiwan  

E-Print Network (OSTI)

HVAC HVAC CommisioningCommisioning ?? A Status Report in TaiwanA Status Report in Taiwan Dr. K.H. YangDr. K.H. Yang Fellow ASHRAEFellow ASHRAEProfessor, National Sun Professor, National Sun Yat... ,decided to conduct an overall renovation program for the HVAC systems of existing governmental buildings where it is mandatory to adapt BEMS and conducting system commissioning .?This program not only constructs an important step in responding...

Yang, K. H.

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Solar Neutrinos: Status and Prospects  

E-Print Network (OSTI)

We describe the current status of solar neutrino measurements and of the theory -- both neutrino physics and solar astrophysics -- employed in interpreting measurements. Important recent developments include Super-Kamiokande's determination of the neutrino-electron elastic scattering rate for 8B neutrinos to 3%; the latest SNO global analysis in which the inclusion of low-energy data from SNO I and II significantly narrowed the range of allowed values for the neutrino mixing angle theta12; Borexino results for both the 7Be and pep neutrino fluxes, the first direct measurements constraining the rate of ppI and ppII burning in the Sun; global reanalyses of solar neutrino data that take into account new reactor results on theta13; a new decadal evaluation of the nuclear physics of the pp chain and CNO cycle defining best values and uncertainties in the nuclear microphysics input to solar models; recognition of an emerging discrepancy between two tests of solar metallicity, helioseismological mappings of the sound speed in the solar interior, and analyses of the metal photoabsorption lines based on our best current description of the Sun's photosphere; a new round of standard solar model calculations optimized to agree either with helioseismology or with the new photospheric analysis; and, motivated by the solar abundance problem, the development of nonstandard, accreting solar models, in order to investigate possible consequences of the metal segregation that occurred in the proto-solar disk. We review this progress and describe how new experiments such as SNO+ could help us further exploit neutrinos as a unique probe of stellar interiors.

W. C. Haxton; R. G. Hamish Robertson; Aldo M. Serenelli

2012-08-28T23:59:59.000Z

242

Federal assistance program. Geothermal technology transfer. Project status report, May 1986  

SciTech Connect

Progress for the month of May, 1986, is described. Projects include evaluation of direct heating of greenhouses and other businesses, technology transfer to consultants, developers and users, and program monitor activities. (ACR)

Lienau, P.J.; Culver, G.

1986-05-01T23:59:59.000Z

243

FTCP Senior Technical Safety Manager (STSM) Status Report  

Energy.gov (U.S. Department of Energy (DOE))

List of Senior Technical Safety Manager Positions, Base Requirements, Compensatory Measures and Qualification Status.

244

Status and EAC Recommendations for Electricity Delivery Workforce (September 2014)  

Energy.gov (U.S. Department of Energy (DOE))

Status and recommendations presented at the September 2014 meeting for Electricity Delivery Workforce (September 2014)

245

Portsmouth Gaseous Diffusion Plant - Quadrant I Groundwater Investigat...  

Office of Environmental Management (EM)

Controlled Area of Plume (acres): 38 Plume Status: Plume static or shrinking is size Remedial Approach Remedy Name Status Start Date End Date Treatment Status Pump and treat...

246

Annual Hanford Site environmental permitting status report  

SciTech Connect

This Annual Hanford Site Environmental Permitting Status Report (Status Report) was prepared in response to requirements prescribed in U.S. Department of Energy (DOE) Order 5400.2A, `Environmental Compliance Issue Coordination`. This Order, canceled in April 1996, required that information on existing and anticipated environmental permitting for DOE facilities be submitted (or updated) annually by October 1 of each calendar year. Although the Order was canceled, the need for this Status Report still remains. For example, the Washington State Department of Ecology`s (Ecology) Dangerous Waste Permit Application Requirements (Publication Number 95-402, June 1996), Checklist Section J, calls for current information on existing and anticipated environmental permitting. As specified in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28), this Status Report serves as the vehicle for meeting this requirement for the Hanford Facility. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by the Resource Conservation and Recovery Act (RCRA) of 1976, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) are addressed. Information on RCRA and non-RCRA permitting is included and is current as of July 31, 1996.

Thompson, S.A.

1996-10-01T23:59:59.000Z

247

Improving the renewable energy mix in a building toward the nearly zero energy status  

Science Journals Connector (OSTI)

Abstract Developing Nearly Zero Energy Buildings (NyZEB) represents a path toward sustainable communities and is required by international regulations, starting with 2018. Combined measures for reducing the energy demand and increasing the share of renewable energy systems in buildings are very much investigated for different types of buildings. One specific case is represented by the buildings where as result of the green energy policies renewables are already installed, but the NyZEB status is not reached yet. These buildings are main candidates in getting this status as the initial investment required is significantly lower. A novel methodology is presented for this type of buildings aiming at identifying the optimal combination of actions to be taken for reducing the energy demand and developing optimized renewable energy mixes, integrating the existing ones, up to the (Ny)ZEB status. Following this methodology, a cases study is presented the Solar House (low energy building with geothermal system and solar energy convertors) and the steps followed for reaching the Zero Energy Building standards are presented. Considering the current energy status of the building, the renewable energy potential and the costs, a tracked PV string array is proposed to be added and the steps in design optimization are outlined.

Ion Visa; Macedon D. Moldovan; Mihai Comsit; Anca Duta

2014-01-01T23:59:59.000Z

248

Lab Status via Twitter | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Lab Status via Twitter Lab Status via Twitter Employees can be notified of changes to the laboratory's operations - for example, a delayed opening due to a heavy overnight snowfall - via the "Argonnestatus" account on Twitter. The account can be set to automatically send text messages to most mobile phones and PDAs. In addition to a short description of any changes in laboratory operations, messages may contain links to additional, detailed information. Only messages about changes in laboratory business hours will be sent. Most mobile communication devices can receive Twitter updates; instructions for receiving Argonne Status updates by phone are below. Any applicable text messaging charges from your provider are your responsibility. The Twitter Web site has basic information about the free online service.

249

ORISE: Voluntary Protection Program (VPP) Star Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Voluntary Protection Program (VPP) Star Status Voluntary Protection Program (VPP) Star Status Within the U.S. Department of Energy's (DOE) Voluntary Protection Program (VPP), there are three levels of recognition: STAR, MERIT and DEMONSTRATION. Contractors' programs that meet the requirements for outstanding safety and health programs, earn VPP STAR status-the highest achievement level. In December of 2003, the Oak Ridge Institute for Science and Education (ORISE) first earned STAR distinction following a comprehensive evaluation of its application for the VPP program. At that time, ORISE was just the 21st DOE site and the first in Tennessee to earn such exemplary recognition. In 2011 ORISE received its seventh consecutive Star of Excellence award. Today, ORISE is one of more than two dozen DOE sites to achieve VPP STAR

250

ARM - Value-Added Product Status Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Status Reports Status Reports Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information Materials Image Library Videos Publication Resources Submit a Publication Publishing Procedures ARM Style Guide (PDF, 448KB) Acronyms Glossary Logos Contacts RSS for Publications Value-Added Product Status Reports ARM Climate Research Facility Quarterly Value-Added Product Report July 1-September 30, 2013 (PDF, 1MB) ARM Climate Research Facility Quarterly Value-Added Product Report April 1-June 30, 2013 (PDF, 1MB) ARM Climate Research Facility Quarterly Value-Added Product Report January 1-March 31, 2013 (PDF, 268KB) ARM Climate Research Facility Quarterly Value-Added Product Report October 1-December 31, 2012 (PDF, 271KB) ARM Climate Research Facility Quarterly Value-Added Product Report

251

Historical Data/Case for mitigation SDOX Design  

E-Print Network (OSTI)

at conservation pool elevation #12;2011 Rainfall, Inflow, and Elevation Designed to operate at 1039' below Operated and governed by the Central Oklahoma Master Conservancy District (COMCD). 5,377 acre-lake with a volumetric capacity of 106,669 acre-feet Designated uses are flood control, municipal water supply

Soerens, Thomas

252

HSPD-12 Implementation Status Report Updated Date:  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation Status Report Implementation Status Report Updated Date: Number of Employees requiring PIV credentials* Number of Employees requiring a NACI (or at least equivalent) that have not previously undergone a background check* Number of Employees requiring a NACI (or at least equivalent) with background investigation in process* Number of Employees with completed/adjudicated NACI (or equivalent background investigation)* Total Number of PIV credentials Issued to Employees* Number of Contractors requiring PIV credentials Number of Contractors requiring NACIs (or at least equivalent) that have not previously undergone a background check Number of Contractors requiring a NACI (or at least equivalent) with background investigation in process Number of Contractors with

253

What is the status of the Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

status of the Project? status of the Project? The first phase of the project was energized on July 20, 2006. It operated flawlessly as an integral part of National Grid's 35-kilovolt network in Albany, serving the equivalent of 25,000 homes. It was taken offline after nine months to begin phase II of the project: replacing a 30-meter section with 2G cable, which will be the world's first use of 2G in any utility device. Phase II of the project was energized on January 8, 2008.

254

Indonesia and Climate Change: Current Status and Policies | Open Energy  

Open Energy Info (EERE)

and Climate Change: Current Status and Policies and Climate Change: Current Status and Policies Jump to: navigation, search Name Indonesia and Climate Change: Current Status and Policies Agency/Company /Organization World Bank, Department for International Development Indonesia Sector Energy, Land Focus Area Renewable Energy, Forestry, Agriculture Topics Policies/deployment programs, Background analysis Resource Type Publications Website http://siteresources.worldbank Country Indonesia South-Eastern Asia References Indonesia and Climate Change: Current Status and Policies[1] Background References ↑ "Indonesia and Climate Change: Current Status and Policies" Retrieved from "http://en.openei.org/w/index.php?title=Indonesia_and_Climate_Change:_Current_Status_and_Policies&oldid=328842

255

Technology status and project development risks of advanced coal power generation technologies in APEC developing economies  

SciTech Connect

The report reviews the current status of IGCC and supercritical/ultrasupercritical pulverized-coal power plants and summarizes risks associated with project development, construction and operation. The report includes an economic analysis using three case studies of Chinese projects; a supercritical PC, an ultrasupercritical PC, and an IGCC plant. The analysis discusses barriers to clean coal technologies and ways to encourage their adoption for new power plants. 25 figs., 25 tabs.

Lusica, N.; Xie, T.; Lu, T.

2008-10-15T23:59:59.000Z

256

Radioactive Waste Incineration: Status Report  

SciTech Connect

Incineration is generally accepted as a method of reducing the volume of radioactive waste. In some cases, the resulting ash may have high concentrations of materials such as Plutonium or Uranium that are valuable materials for recycling. Incineration can also be effective in treating waste that contains hazardous chemicals as well as radioactive contamination. Despite these advantages, the number of operating incinerators currently in the US currently appears to be small and potentially declining. This paper describes technical, regulatory, economic and political factors that affect the selection of incineration as a preferred method of treating radioactive waste. The history of incinerator use at commercial and DOE facilities is summarized, along with the factors that have affected each of the sectors, thus leading to the current set of active incinerator facilities. In summary: Incineration has had a long history of use in radioactive waste processing due to their ability to reduce the volume of the waste while destroying hazardous chemicals and biological material. However, combinations of technical, regulatory, economic and political factors have constrained the overall use of incineration. In both the Government and Private sectors, the trend is to have a limited number of larger incineration facilities that treat wastes from a multiple sites. Each of these sector is now served by only one or two incinerators. Increased use of incineration is not likely unless there is a change in the factors involved, such as a significant increase in the cost of disposal. Medical wastes with low levels of radioactive contamination are being treated effectively at small, local incineration facilities. No trend is expected in this group. (authors)

Diederich, A.R.; Akins, M.J. [WorleyParsons, Reading, PA (United States)

2008-07-01T23:59:59.000Z

257

Enforcement Cases  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

cases Office of the General Counsel 1000 cases Office of the General Counsel 1000 Independence Ave., SW Washington, DC, 20585 202-586-5281 en AeroSys: Order (2011-SCE-1624) http://energy.gov/gc/downloads/aerosys-order-2011-sce-1624 AeroSys: Order (2011-SCE-1624)

258

Case Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Case Study Case Study M2M Smart Grid Investment Grant 1 An irrigation pump connected to a web---to---wireless controller designed by M2M Communications. Agricultural Demand Response Program in California Helps Farmers Reduce Peak Electricity Usage, Operate More Efficiently Year---Round The development of a two---way, web---to---wireless controller for irrigation pumps is the foundation for an agricultural demand response program in California. Designed by M2M Communications of Boise, Idaho, the controller is part of an irrigation load control system that also includes sensors, smart meters, and other monitoring equipment. Partially funded with $2.2 million in Recovery Act stimulus funds awarded by the U.S. Department of

259

Case Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Name of Petitioner: Name of Petitioner: Date of Filing: Case Number: Department of Energy Washington, DC 20585 JUL 2 2 2009 DEPARTMENT OF ENERGY OFFICE OF HEARINGS AND APPEALS Appeal Dean P. Dennis March 2, 2009 TBA-0072 Dean D. Dennis filed a complaint of retaliation under the Department of Energy (DOE) Contractor Employee Protection Program, 10 C.F.R. Part 708. Mr. Dennis alleged that he engaged in protected activity and that his employer, National Security Technologies, LLC (NSTec ), subsequently terminated him. An Office of Hearings and Appeals (OHA) Hearing Officer denied relief in Dean P. Dennis, Case No. TBH-0072, 1 and Mr. Dennis filed the instant appeal. As discussed below, the appeal is denied. I. Background The DOE established its Contractor Employee Protection Program to "safeguard public

260

FOIA Cases  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

foia-cases Office of Hearings and Appeals 1000 foia-cases Office of Hearings and Appeals 1000 Independence Ave., SW Washington, DC, 20585 202-287-1566 en FIA-13-0077 - In the Matter of John F. Garrity http://energy.gov/oha/downloads/fia-13-0077-matter-john-f-garrity FIA-13-0077 - In the Matter of John F. Garrity

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Security Cases  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

security-cases Office of Hearings and Appeals 1000 security-cases Office of Hearings and Appeals 1000 Independence Ave., SW Washington, DC, 20585 202-287-1566 en PSH-13-0103 - In the Matter of Personnel Security http://energy.gov/oha/downloads/psh-13-0103-matter-personnel-security PSH-13-0103 - In the Matter of Personnel Security

262

Whistleblower Cases  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

whistleblower-cases Office of Hearings and Appeals whistleblower-cases Office of Hearings and Appeals 1000 Independence Ave., SW Washington, DC, 20585 202-287-1566 en WBX-12-0004 - In the Matter of Denise Hunter http://energy.gov/oha/downloads/wbx-12-0004-matter-denise-hunter WBX-12-0004 - In the Matter of Denise Hunter

263

EIA Cases  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

eia-cases Office of Hearings and Appeals 1000 eia-cases Office of Hearings and Appeals 1000 Independence Ave., SW Washington, DC, 20585 202-287-1566 en TEE-0073 - In the Matter of Cole Distributing, Inc. http://energy.gov/oha/downloads/tee-0073-matter-cole-distributing-inc TEE-0073 - In the Matter of Cole Distributing, Inc.

264

3Compliance Status 2003 SITE ENVIRONMENTAL REPORT  

E-Print Network (OSTI)

3-1 3Compliance Status 2003 SITE ENVIRONMENTAL REPORT Brookhaven National Laboratory (BNL supply met all drinking water requirements. Groundwater monitoring at the Major Petroleum Facility reported to the New York State Department of Environmental Conservation (NYSDEC). Twenty-two reportable

Homes, Christopher C.

265

Status of the NRC Decommissioning Program  

SciTech Connect

On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.

Orlando, D. A.; Camper, L.; Buckley, J.; Pogue, E.; Banovac, K.

2003-02-24T23:59:59.000Z

266

Current Status of Vaccines for Schistosomiasis  

Science Journals Connector (OSTI)

...McManus. 2004. The cytoskeleton and motor proteins of human schistosomes and their...Holmgren. 2004. Current status and future prospects for a vaccine against schistosomiasis...Hookworm vaccines-past, present and future. Lancet Infect. Dis. 6: 733-741...

Donald P. McManus; Alex Loukas

2008-01-01T23:59:59.000Z

267

The Population Status The American Alligator  

E-Print Network (OSTI)

Carolina by Thomas M. Murphy A Publication of the Savannah River Plant National Environmental Research Park'S SAVANNAH RIVER PLANT NATIONAL ENVIRONMENT RESEARCH PARK Copies may be obtained from Savannah River Ecology Laboratory #12;- The Population Status of the American Alligator on the Savannah River Plant, South Carolina

Georgia, University of

268

Kaonic Hydrogen: Status of the DEAR Experiment  

Science Journals Connector (OSTI)

......al. Nucl. Instrum. Methods (1987) A 253:365...al. Nucl. Instrum. Methods (1996) A 377:346...al. Nucl. Instrum. Methods (2003) A 496:315...149, 2003 Kaonic Hydrogen Status of the DEAR Experiment...annihilation. The Phi production cross section is 3000......

G. Beer; A. M. Bragadireanu; M. Cargnelli; C. Curceanu (Petrascu); J.-P. Egger; H. Fuhrmann; M. Giersch; C. Guaraldo; M. Iliescu; T. Ishiwatari; K. Itahashi; M. Iwasaki; P. Kienle; B. Lauss; V. Lucherini; L. Ludhova; J. Marton; F. Mulhauser; T. Ponta; L. A. Schaller; D. L. Sirghi; F. Sirghi; J. Zmeskal

2003-01-01T23:59:59.000Z

269

NUCLEAR POWER IN CALIFORNIA: 2007 STATUS REPORT  

E-Print Network (OSTI)

NUCLEAR POWER IN CALIFORNIA: 2007 STATUS REPORT Prepared For: California Energy Commission Prepared No. 700-05-002 Prepared For: California Energy Commission Barbara Byron, Senior Nuclear Policy;Abstract This consultant report examines how nuclear power issues have evolved since publication

270

Solar Photovoltaics development -Status and perspectives  

E-Print Network (OSTI)

Solar Photovoltaics development - Status and perspectives Jørgen Fenhann Risø National Laboratory for the development of solar photovoltaics, contributing to the Macro Task E1 on production cost for fusion.S. with 53 MWp followed by Japan and EU. Until now off-grid installation have dominated the solar PV market

271

Status of Transuranic Bearing Metallic Fuel Development  

SciTech Connect

This paper summarizes the status of the metallic fuel development under the Advanced Fuel Cycle Initiative (AFCI). The metallic fuel development program includes fuel fabrication, characterization, advanced cladding research, irradiation testing and post-irradiation examination (PIE). The focus of this paper is on the recent irradiation experiments conducted in the Advanced Test Reactor and some PIE results from these tests.

Steve Hayes; Bruce Hilton; Heather MacLean; Debbie Utterbeck; Jon Carmack; Kemal Pasamehmetoglu

2009-09-01T23:59:59.000Z

272

Magnetic Confinement Fusion Science Status and Challenges  

E-Print Network (OSTI)

Magnetic Confinement Fusion Science Status and Challenges S. Prager University of Wisconsin February, 2005 #12;Two approaches to fusion Inertial confinement extremely dense, short-lived Magnetic ·Control plasma disruptions ·Develop new magnetic configurations ·Control the plasma-wall interaction

273

Current status of the US RERTR Program  

SciTech Connect

This paper describes the status of the RERTR Program. The main objective is to provide the audience with some orientation and sense of perspective that may assist in viewing the other program presentations as part of an overall effort, rather than as separate and unrelated activities.

Travelli, A.

1982-01-01T23:59:59.000Z

274

Neutrinoless Double $?$-Decay: Status and Future  

E-Print Network (OSTI)

A brief summary of the status of neutrino masses, mixing and oscillations is presented. Neutrinoless double $\\beta$-decay is considered. Predictions for the effective Majorana mass are reviewed. A possible test of the calculations of nuclear matrix elements of the $0\

S. M. Bilenky

2005-09-11T23:59:59.000Z

275

STATUS OF THE NRC'S DECOMMISSIONING PROGRAM  

SciTech Connect

On July 21, 1997, the U.S. Nuclear Regulatory Commission published the final rule on Radiological Criteria for License Termination (the License Termination Rule) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program. It discusses the status of permanently shut-down commercial power reactors, complex decommissioning sites, and sites listed in the Site Decommissioning Management Plan. The paper provides the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including a Standard Review Plan for evaluating plans and information submitted by licensees to support the decommissioning of nuclear facilities and the D and D Screen software for determining the potential doses from residual radioactivity. Finally, it discusses the status of the staff's current efforts to streamline the decommissioning process.

Orlando, D. A.; Camper, L. W.; Buckley, J.

2002-02-25T23:59:59.000Z

276

Fuel Cell Technology Status - Voltage Degradation (Presentation)  

SciTech Connect

This presentation describes an independent assessment of fuel cell durability status and discusses the project's relevance to the Department of Energy Hydrogen and Fuel Cells Program; NREL's analysis approach; the FY12 technical accomplishments including the fourth annual publication of results; and project collaborations and future work.

Kurtz, J.; Wipke,; Sprik, S.; Saur, G.

2012-06-01T23:59:59.000Z

277

EBT-P project status report  

SciTech Connect

This Elmo Bumpy Torus Report describes the status of the EBT-P Project in September 1983 after phasedown of the Title II design effort. The report is intended to be a principle source of guidance in the event of a decision to resume work on the project.

Not Available

1983-11-01T23:59:59.000Z

278

Hg System Assembly and Testing Status  

E-Print Network (OSTI)

OF ENERGY Current Status / Next Steps · Populate secondary box ports · Complete plumbing inside secondary #12;2VRVS Meeting 1 Nov 2006 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Welding OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Cart Modifications · Secondary box center

McDonald, Kirk

279

IMMIGRATION HANDBOOK (F-1 VISA STATUS)  

E-Print Network (OSTI)

IMMIGRATION HANDBOOK (F-1 VISA STATUS) FOR FSU DEPARTMENTS #12;IMMIGRATION HANDBOOK FOR FSU? What if an F-1 student wishes to withdraw from FSU or take a leave of absence? What does an F-1 student need to do if he/she cannot complete the program before his/her I-20 expiration date? How does

280

The Current Status of Male and Female Sterilization Procedures  

Science Journals Connector (OSTI)

10 December 1976 research-article The Current Status of Male and Female Sterilization Procedures I. Lubell Ruth Frischer The current status of male and female sterilization is defined. Current techniques involved in the surgical occlusion...

1976-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

AGRICULTURE, 2004 Status of the Wisconsin Farm Economy  

E-Print Network (OSTI)

STATUS OF WISCONSIN AGRICULTURE, 2004 Status of the Wisconsin Farm Economy Situation and Outlook Situation: Implications for U.S. Agriculture · The Evolution and Current Status of Livestock Production and Meat Processing in Wisconsin Department of Agricultural and Applied Economics College of Agricultural

Radeloff, Volker C.

282

Wisconsin Agriculture Status of the Wisconsin Farm Economy  

E-Print Network (OSTI)

STATUS OF Wisconsin Agriculture 2011 · Status of the Wisconsin Farm Economy · Current Outlook: Farm of Agricultural and Applied Economics College of Agricultural and Life Sciences University of Wisconsin-Madison Cooperative Extension University of Wisconsin-Extension #12;Status of Wisconsin Agriculture, 2011 An annual

Radeloff, Volker C.

283

Case Western University (Vestas) | Open Energy Information  

Open Energy Info (EERE)

University (Vestas) University (Vestas) Jump to: navigation, search Name Case Western University (Vestas) Facility Case Western University (Vestas) Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Case Western University Developer Case Western University Energy Purchaser Sopko & Sons - excess to First Energy Location Euclid OH Coordinates 41.60216607°, -81.49763346° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.60216607,"lon":-81.49763346,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

284

Case Western University (Nordex) | Open Energy Information  

Open Energy Info (EERE)

University (Nordex) University (Nordex) Jump to: navigation, search Name Case Western University (Nordex) Facility Case Western University (Nordex) Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Case Western University Developer Case Western University Energy Purchaser Stamco Inc - excess to First Energy Location Euclid OH Coordinates 41.60213398°, -81.49688244° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.60213398,"lon":-81.49688244,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

285

FPA Meeting, 10/11-12/05 Status of World ST Research Status of World Spherical Torus Research  

E-Print Network (OSTI)

ST to Explore Plasma Limits as A 1 Pegasus (US) #12;FPA Meeting, 10/11-12/05 Status of World STFPA Meeting, 10/11-12/05 Status of World ST Research Status of World Spherical Torus Research and Energy Policy October 11-12, 2005, Washington, DC Supported by Office of Science College W&M Colorado Sch

286

Status and Impact of State MTBE Bans  

Gasoline and Diesel Fuel Update (EIA)

Status and Impact of State MTBE Bans Status and Impact of State MTBE Bans Background As a result of the Clean Air Act Amendments of 1990 (CAAA90), the year-round use of reformulated gasoline (RFG) has been required in cities with the worst smog problems since 1995 (Figure 1). One of the requirements of RFG specified by CAAA90 is a 2- percent oxygen requirement, which is met by blending "oxygenates," 1 including methyl tertiary butyl ether (MTBE) and ethanol, into the gasoline. MTBE is the oxygenate used in almost all RFG outside of the Midwest. Ethanol is currently used in the Midwest as an oxygenate in RFG and as an octane booster and volume extender in conventional gasoline. Several years ago, MTBE was detected in water supplies scattered throughout the country, but predominantly in areas using RFG. MTBE from RFG was apparently

287

July 2012, Training Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Work Group Status Overview Training Work Group Status Overview Accomplishments: 1. May 7 - 8. Attended NIEHS Trainer's Exchange in Oak Ridge . 2. May 8 - 9. Joined HAMMER in visiting Oak Ridge entities to build support for the Radworker Pilot. 3. June 19-20. Joined Char Wells at Sandia (with NIEHS and HAMMER) for the Learning/Training Workshop. 2. NTC offered support for Data Warehousing at the Learning/Training Workshop. 3. Obtained EFCOG commitment to create a Human Capital Training Subgroup under the Business Management Working Group. 4. June 20 - 21. Hosted HAMMER to develop Radworker Reciprocity Program Checklist. 5. July 10-11. HSS Focus Group Training Working Group and Subcommittee meetings at NTC. Upcoming Meetings: Boardman meeting with HAMMER week of July 29.

288

MMCR Upgrades: Present Status and Future Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

MMCR Upgrades: Present Status and Future Plans MMCR Upgrades: Present Status and Future Plans K. B. Widener and A. S. Koontz Pacific Northwest National Laboratory Richland, Washington K. P. Moran and K. A. Clark National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado C. Chander STC xxxxxxxxx M. A. Miller and K. L. Johnson Brookhaven National Laboratory Upton, New York Abstract In September 2003, the Southern Great Plains (SGP) millimeter wave cloud radar (MMCR) was upgraded to a new digital signal processor that significantly increases the temporal resolution and the processing capability of the MMCR. The Barrow MMCR upgrade will be completed in early 2004. We will discuss the hardware and software C40 upgrade to the MMCRs at SGP and Barrow and the plans

289

September 2012, Training Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Work Group Status Overview Training Work Group Status Overview Accomplishments: 1. May 7-8. Attended NIEHS Trainer's Exchange in Oak Ridge. 2. May 8-9. Joined HAMMER in visiting Oak Ridge entities to build support for the Radworker pilot. Entities visited included ORISE, Y-12, DOE TRU Project, and local labor entities. 3. June 19-20. Participated with Char Wells, Sandia National Laboratory Training Manager, (NTC, NIEHS and HAMMER in attendance) at a DOE M&O contractor led Learning/Training Workshop. - Obtained EFCOG commitment to create a Human Capital Training Subgroup under the Business Management Working Group. - Serving this group as data repository and communications hub for efforts to standardize General Employee Radiation Training (GERT) within DOE. - Briefed the complex wide Radworker reciprocity concept finding interest and

290

User Agreement and Proprietary Account Status  

NLE Websites -- All DOE Office Websites (Extended Search)

User Agreement and Proprietary Account Status (04-Oct-2013) User Agreement and Proprietary Account Status (04-Oct-2013) Listed below are the 562 institutions that have signed APS User Agreements as financially contributing CAT members (indicated by CAT acronyms) and/or as non-members (indicated by "GU") as of (04-Oct-2013). A CAT Agreement covers users' activities at that CAT's beam lines; a GU Agreement covers users' activities at any APS beam line. All listed Agreements are nonproprietary unless otherwise noted. A superscript p indicates that a proprietary User Account has also been established. If you are not an ANL employee, a User Agreement signed by your home institution is a prerequisite for hands-on work at the APS. If your institution is not listed below (or if your institution is listed but a

291

Smart Grid Status and Metrics Report Appendices  

SciTech Connect

A smart grid uses digital power control and communication technology to improve the reliability, security, flexibility, and efficiency of the electric system, from large generation through the delivery systems to electricity consumers and a growing number of distributed generation and storage resources. To convey progress made in achieving the vision of a smart grid, this report uses a set of six characteristics derived from the National Energy Technology Laboratory Modern Grid Strategy. The Smart Grid Status and Metrics Report defines and examines 21 metrics that collectively provide insight into the grids capacity to embody these characteristics. This appendix presents papers covering each of the 21 metrics identified in Section 2.1 of the Smart Grid Status and Metrics Report. These metric papers were prepared in advance of the main body of the report and collectively form its informational backbone.

Balducci, Patrick J.; Antonopoulos, Chrissi A.; Clements, Samuel L.; Gorrissen, Willy J.; Kirkham, Harold; Ruiz, Kathleen A.; Smith, David L.; Weimar, Mark R.; Gardner, Chris; Varney, Jeff

2014-07-01T23:59:59.000Z

292

Fossil energy waste management. Technology status report  

SciTech Connect

This report describes the current status and recent accomplishments of the Fossil Energy Waste Management (FE WM) projects sponsored by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The primary goal of the Waste Management Program is to identify and develop optimal strategies to manage solid by-products from advanced coal technologies for the purpose of ensuring the competitiveness of advanced coal technologies as a future energy source. The projects in the Fossil Energy Waste Management Program are divided into three types of activities: Waste Characterization, Disposal Technologies, and Utilization Technologies. This technology status report includes a discussion on barriers to increased use of coal by-products. Also, the major technical and nontechnical challenges currently being addressed by the FE WM program are discussed. A bibliography of 96 citations and a list of project contacts is included if the reader is interested in obtaining additional information about the FE WM program.

Bossart, S.J.; Newman, D.A.

1995-02-01T23:59:59.000Z

293

Alternative Fuels Data Center: Status Update: Clarification of Ethanol  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Clarification of Ethanol Certification Limits for Legacy Equipment Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) to someone by E-mail Share Alternative Fuels Data Center: Status Update: Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) on Facebook Tweet about Alternative Fuels Data Center: Status Update: Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) on Twitter Bookmark Alternative Fuels Data Center: Status Update: Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) on Google Bookmark Alternative Fuels Data Center: Status Update: Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) on Delicious Rank Alternative Fuels Data Center: Status Update: Clarification of

294

Outreach and Collaboration Program Status and Accomplishments 2008-2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Status and Accomplishments Program Status and Accomplishments 2008-2009 Outreach and Collaboration Program Status and Accomplishments 2008-2009 Outreach and Collaboration has helped HSS expand the DOE's sphere of communication and influence through broad-based dialogues, cultivating productive interagency relationships, and collaborative overtures to external entities - public and private alike - whose interests and goals align with HSS and DOE mission. This status report highlights the characteristics and accomplishments of the four outreach and collaboration programs, each of which exists to support and sustain the DOE mission of "Discovering the solutions topower and secure America's future". Outreach and Collaboration Program Status and Accomplishments 2008-2009 More Documents & Publications

295

Natural Gas Vehicles: Status, Barriers, and Opportunities  

NLE Websites -- All DOE Office Websites (Extended Search)

ESD/10-4 ESD/10-4 Natural Gas Vehicles: Status, Barriers, and Opportunities Energy Systems Division About Argonne National Laboratory Argonne is a U.S. Department of Energy laboratory managed by UChicago Argonne, LLC under contract DE-AC02-06CH11357. The Laboratory's main facility is outside Chicago, at 9700 South Cass Avenue, Argonne, Illinois 60439. For information about Argonne and its pioneering science and technology programs, see www.anl.gov.

296

Status of solar assisted desalination: A review  

Science Journals Connector (OSTI)

The application of solar assisted desalination is expanding impressively during the last years, hence an overview of this evolution is attempted. The various solar devices, for the conversion of the sun's energy onto heat or electric power are described with emphasis to their application in water desalination processes. The status of the solar assisted desalination as developed the last eight years and the installed plants in commercial or semi-commercial size as well as some plant under development are summarized.

E.-E Delyannis

1987-01-01T23:59:59.000Z

297

Status report: The Groningen AMS facility  

Science Journals Connector (OSTI)

The Groningen AMS facility has been in operation since 1994. The AMS is based on a 2.5 MV tandetron accelerator. It is an automatic mass spectrometer, dedicated to 14C analysis. Thus far, a grand total of about 16000 14C targets have been measured. We report here on the status and performance of the facility, technical improvements and a precision study on atmospheric samples.

J van der Plicht; S Wijma; A.T Aerts; M.H Pertuisot; H.A.J Meijer

2000-01-01T23:59:59.000Z

298

Smart Grid Status and Metrics Report  

SciTech Connect

To convey progress made in achieving the vision of a smart grid, this report uses a set of six characteristics derived from the National Energy Technology Laboratory Modern Grid Strategy. It measures 21 metrics to provide insight into the grids capacity to embody these characteristics. This report looks across a spectrum of smart grid concerns to measure the status of smart grid deployment and impacts.

Balducci, Patrick J.; Weimar, Mark R.; Kirkham, Harold

2014-07-01T23:59:59.000Z

299

Non-metric gravity: A status report  

E-Print Network (OSTI)

We review the status of a certain (infinite) class of four-dimensional generally covariant theories propagating two degrees of freedom that are formulated without any direct mention of the metric. General relativity itself (in its Plebanski formulation) belongs to the class, so these theories are examples of modified gravity. We summarize the current understanding of the nature of the modification, of the renormalizability properties of these theories, of their coupling to matter fields, and describe some of their physical properties.

Kirill Krasnov

2007-11-05T23:59:59.000Z

300

Nova power systems: status and operating experience  

SciTech Connect

This paper describes the pulse power systems that are used in these lasers; the status and the operating experiences. The pulsed power system for the Nova Laser is comprised of several distinct technology areas. The large capacitor banks for driving flashlamps that excite the laser glass is one area, the fast pulsers that drive pockels cell shutters is another area, and the contol system for the pulsed power is a third. This paper discusses the capacitor banks and control systems.

Whitham, K.; Merritt, B.T.; Gritton, D.G.; Smart, A.J.; Holloway, R.W.; Oicles, J.A.

1983-11-28T23:59:59.000Z

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Status Update: Closing Rocky Flats by 2006  

SciTech Connect

Safely closing Rocky Flats by December 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy (DOE), Kaiser-Hill and its team of subcontractors, the site's employees and taxpayers across the country. This paper will: provide a status of the Closure Project to date; describe important accomplishments of the past year; describe some of the closure-enhancing technologies enabling acceleration; and discuss the remaining challenges ahead.

Tuor, N.; Schubert, A.

2003-02-25T23:59:59.000Z

302

Propane Vehicles: Status, Challenges, and Opportunities  

NLE Websites -- All DOE Office Websites (Extended Search)

Propane Vehicles: Propane Vehicles: Status, Challenges, and Opportunities ANL/ESD/10-2 Energy Systems Division Availability of This Report This report is available, at no cost, at http://www.osti.gov/bridge. It is also available on paper to the U.S. Department of Energy and its contractors, for a processing fee, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62

303

Alternative Fuels Data Center: Status Update: E85 Dispenser System  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

E85 E85 Dispenser System Certified (June 2010) to someone by E-mail Share Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Facebook Tweet about Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Twitter Bookmark Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Google Bookmark Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Delicious Rank Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Digg Find More places to share Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on AddThis.com... Status Update: E85 Dispenser System Certified (June 2010)

304

Alternative Fuels Data Center: Status Update: Requirements Have Not Changed  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Requirements Have Not Changed (June 2008) to someone by E-mail Requirements Have Not Changed (June 2008) to someone by E-mail Share Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Facebook Tweet about Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Twitter Bookmark Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Google Bookmark Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Delicious Rank Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Digg Find More places to share Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on AddThis.com... Status Update: Requirements Have Not Changed (June 2008)

305

Science DMZ Case Studies  

NLE Websites -- All DOE Office Websites (Extended Search)

Studies Science Engagement Move your data Programs & Workshops Science Requirements Reviews Case Studies OSCARS Case Studies Science DMZ Case Studies Science DMZ @ UF Science DMZ @...

306

Case Western University | Open Energy Information  

Open Energy Info (EERE)

University University Facility Case Western University Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner Case Western University Energy Purchaser Case Western University Location Cleveland OH Coordinates 41.50239055°, -81.60550386° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.50239055,"lon":-81.60550386,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

307

Status of the National Security Workforce  

SciTech Connect

This report documents the status of the national security workforce as part of the National Security Preparedness Project, being performed by the Arrowhead Center of New Mexico State University under a DOE/NNSA grant. This report includes an assessment of the current workforce situation. The national security workforce is an important component of national security for our country. With the increase of global threats of terrorism, this workforce is being called upon more frequently. This has resulted in the need for an increasing number of national security personnel. It is imperative to attract and retain a skilled and competitive national security workforce.

None

2008-03-31T23:59:59.000Z

308

Status of LMFBR development project in Japan  

SciTech Connect

Initiation of the LMFBR development project in Japan was decided by the Atomic Energy Commission of Japan in 1966. In 1967, the Power Reactor and Nuclear Fuel Development Corporation (PNC) was established to realize the project as a part of its tasks of a wide scope covering all the research and development activities concerning fuel cycle. In the present paper the status of experimental fast reactor (Joyo), which is the first milestone of the LMFBR project, prototype fast reactor (Monju) and R and D activities supporting the project including that for larger LMFBRs in the future is described.

Nagane, G.; Akebi, M.

1988-01-01T23:59:59.000Z

309

Solar thermal propulsion status and future  

SciTech Connect

The status of solar absorber/thruster research is reviewed, and potential future applications and advanced solar thermal propulsion concepts are discussed. Emphasis is placed on two concepts, the windowless heat exchanger cavity and the porous material absorption concepts. Mission studies demonstrate greater than 50 percent increase in payload compared to chemical propulsion for a LEO-to-GEO mission. Alternative missions that have been considered for this concept include the Thousand Astronomical Unit mission, LEO-to-lunar orbit, and other SEI missions. It is pointed out that solar thermal propulsion is inherently simple and capable of moderate-to-high engine performance at moderate-to-low thrust levels. 15 refs.

Shoji, J.M.; Frye, P.E.; Mcclanahan, J.A. (Rockwell International Corp., Rocketdyne Div., Canoga Park, CA (United States))

1992-03-01T23:59:59.000Z

310

Online Vehicle Detection For Estimating Traffic Status  

E-Print Network (OSTI)

We propose a traffic congestion estimation system based on unsupervised on-line learning algorithm. The system does not rely on background extraction or motion detection. It extracts local features inside detection regions of variable size which are drawn on lanes in advance. The extracted features are then clustered into two classes using K-means and Gaussian Mixture Models(GMM). A Bayes classifier is used to detect vehicles according to the previous cluster information which keeps updated whenever system is running by on-line EM algorithm. Experimental result shows that our system can be adapted to various traffic scenes for estimating traffic status.

Lai, Ranch Y Q

2011-01-01T23:59:59.000Z

311

Current status of the RERTR Program  

SciTech Connect

The main purpose of this paper is to review the progress which has been accomplished by the RERTR Program during the past year, the present status of the program, the activities which are now in progress, and the program plans for the coming years. The changes that have taken place in the overall program plan are, in themselves, not very significant. Some activities were found to be somewhat more difficult than expected and required a longer time to complete; others were found to be less difficult than expected and caused opposite readjustments of the program plan. These effects tend to balance each other when the program is considered as a whole.

Travelli, A.

1980-01-01T23:59:59.000Z

312

Status of the SLC damping rings  

SciTech Connect

Electron beams of full design energy 1.21 GeV and nearly full design intensity 4 x 10/sup 10/ particles/pulse (design 5 x 10/sup 10/) have been extracted from the Stanford Linac and successfully stored in the electron damping ring. Beams of less intensity have been extracted from the ring and reinjected into the Linac. The present intensity limits are not thought to be fundamental. The operating experience with the electron ring and the status of the construction of the positron ring will be discussed. 11 refs., 1 fig., 2 tabs.

Hutton, A.M.; Davies-White, W.A.; Delahaye, J.P.; Fieguth, T.H.; Hofmann, A.; Jager, J.; Kloeppel, P.K.; Lee, M.J.; Linebarger, W.A.; Rivkin, L.

1985-06-01T23:59:59.000Z

313

Current Status of Concentrator Photovoltaic (CPV) Technology  

SciTech Connect

This report describes the current status of the market and technology for concentrator photovoltaic (CPV) cells and modules. Significant progress in CPV has been achieved, including record efficiencies for modules (36.7%) and cells (46%), as well as growth of large field installations in recent years. CPV technology may also have the potential to be cost-competitive on a levelized cost of energy (LCOE) basis in regions of high direct normal irradiance (DNI). The study includes an overview of all installations larger than 1 MW, information on companies currently active in the CPV field, efficiency data, and estimates of the LCOE in different scenarios.

Philipps, S. P.; Bett, A. W.; Horowitz, K.; Kurtz, S.

2015-01-01T23:59:59.000Z

314

BIIDSS GL Inquiry Reports CRSP CASH STATUS  

NLE Websites -- All DOE Office Websites (Extended Search)

BIIDSS GL Inquiry Reports BIIDSS GL Inquiry Reports CRSP CASH STATUS SEPTEMBER 2013 ($ IN THOUSANDS) GENERAL SALT SEED- ROCKY DESERT LEDGER DESCRIPTION FUND LAKE SKADEE DOLORES MOUNTAIN SW TOTALS CASH 101002 PY UNDISBURSED RAF 118 $ - $ - $ - $ - $ 118 $ VAF - $ - $ - $ - $ - $ - $ VMF 41,453 $ 35 $ 579 $ (3,076) $ (1,181) $ 37,810 $ VRF (63,318) $ 2,139 $ 8,487 $ 61,337 $ 128,883 $ 137,528 $ 101003 CY COLLECTIONS VMF 118,825 $ - $ - $ 43,600 $ 46,030 $ 208,455 $ VRF (8,415) $ 884 $ 2,313 $ 987 $ (43,335) $ (47,566) $ 101004 CY DISBURSEMENTS RAF (27) $ -

315

Alternative Fuels Data Center: Status Update: Ethanol Blender Pump  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Ethanol Blender Pump Dispenser Certified (August 2010) to someone by E-mail Share Alternative Fuels Data Center: Status Update: Ethanol Blender Pump Dispenser Certified (August 2010) on Facebook Tweet about Alternative Fuels Data Center: Status Update: Ethanol Blender Pump Dispenser Certified (August 2010) on Twitter Bookmark Alternative Fuels Data Center: Status Update: Ethanol Blender Pump Dispenser Certified (August 2010) on Google Bookmark Alternative Fuels Data Center: Status Update: Ethanol Blender Pump Dispenser Certified (August 2010) on Delicious Rank Alternative Fuels Data Center: Status Update: Ethanol Blender Pump Dispenser Certified (August 2010) on Digg Find More places to share Alternative Fuels Data Center: Status Update: Ethanol Blender Pump Dispenser Certified (August 2010) on

316

Status of strategic petroleum reserve activities  

SciTech Connect

This is the sixth in a series of status reports requested by members of the Senate Committee on Energy and Natural Resources and the House Committee on Energy and Commerce on the administration's activities to implement title VIII of the Energy Security Act. (See enc. II for the July 23, 1980, letter requesting these reviews.) Title VIII requires the President to resume filling the Strategic Petroleum Reserve (SPR) at an average rate of at least 100,000 barrels per day for fiscal year 1981 and succeeding years. Our most recent report on the status of SPR fill activities (EMD-81-85, May 4, 1981) noted that, since passage of the Energy Security Act, the Government had issued contracts for about 75 million barrels of oil to be delivered to the SPR during fiscal year 1981. This is equivalent to an average fill rate of about 205,000 barrels per day for the entire fiscal year. However, on April 24, 1981, the Department of Energy (DOE) postponed purchases of additional oil for the SPR for about 30 days because it hoped to take advantage of expected decreases in crude oil prices during the period.

Not Available

1981-06-19T23:59:59.000Z

317

ETEC - Radioactive Handling Materials Facility (RMHF) Leachfield...  

Office of Environmental Management (EM)

of Plume (acres): 2 Plume Status: Plume expanding but not expected to migrate offsite Remedial Approach Remedy Name Status Start Date End Date Groundwater Use Exit Strategy...

318

EV Everywhre Grand Challenge - Battery Status and Cost Reduction...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EV Everywhere Grand Challenge Battery Status and Cost Reduction Prospects July 26, 2012 David Howell Team Lead, Hybrid & Electric Systems Vehicle Technologies Program U.S....

319

Presentation to the EAC - Smart Grid Subcommittee Work Plan Status...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Advisory Committee Smart Grid Subcommittee Work Plan Status Joe Paladino - DOE Wanda Reder - EAC Smart Grid Sub- Committee Chair June 12, 2012 * Considerations: - Build...

320

Strategic Analysis of the Global Status of Carbon Capture and...  

Open Energy Info (EERE)

Strategic Analysis of the Global Status of Carbon Capture and Storage (CCS): Country Studies, United Arab Emirates Jump to: navigation, search Tool Summary LAUNCH TOOL Name:...

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

UNIT NAME: C-751 Fuel Facility REGULATORY STATUS: AOC  

NLE Websites -- All DOE Office Websites (Extended Search)

,93 186 UNIT NUMBER : UNIT NAME: C-751 Fuel Facility REGULATORY STATUS: AOC LOCATION: Inside plant security fence, immediately south of C-720 building. APPROXIMATE DIMENSION: Two...

322

Updated Appendices to the Status of Environmental Management...  

Office of Environmental Management (EM)

Updated Appendices to the Status of Environmental Management Initiatives to Accelerate the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War...

323

Perceived Vaccination Status in Ecotourists and Risks of Anthropozoonoses  

E-Print Network (OSTI)

status, particularly as the ecotourism industry continues its rapid expansion, and is seen increasingly can produce devastating health and economic outcomes. Ideally, ecotourism functions to facilitate

Muehlenbein, Michael

324

Status Update on Action 2a: Implementation Handbook for Activity...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a: Implementation Handbook for Activity-level Work Planning and Control Status Update on Action 2a: Implementation Handbook for Activity-level Work Planning and Control Addthis...

325

Implementing a Comprehensive Energy Strategy: A Status Report...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Status Report More Documents & Publications 814 DOE booklet copy Fact Sheet: Clean Coal Technology Ushers In New Era in Energy Fact Sheet: Clean Coal Technology Ushers In...

326

Focus Group Meeting (Activities Status) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 19, 2011 Meeting Agenda, Summary and 2011 Directives Reform Status Documents Available for Download Meeting Agenda Meeting Summary and Participants Draft Work Group Matrix Key...

327

CCN 217493 - Provide a Progress Report Describing the Status...  

NLE Websites -- All DOE Office Websites (Extended Search)

1 of 6 Next Generation Nuclear Plant Licensing NGNP FUEL QUALIFICATION WHITE PAPER DEVELOPMENT STATUS REPORT August 2009 Introduction The Next Generation Nuclear Plant (NGNP)...

328

WIPP Update and Status of Recovery | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WIPP Update and Status of Recovery More Documents & Publications Chairs Meeting - April 2014 EM SSAB Conference Calls - September 19, 2011 EIS-0026-SA-05: Supplement Analysis...

329

Green Power Marketing in the United States: A Status Report ...  

NLE Websites -- All DOE Office Websites (Extended Search)

6581 September 2009 Green Power Marketing in the United States: A Status Report (2008 Data) Lori Bird, Claire Kreycik, and Barry Friedman National Renewable Energy Laboratory 1617...

330

Geophysics, Geology and Geothermal Leasing Status of the Lightning...  

Open Energy Info (EERE)

Leasing Status of the Lightning Dock KGRA, Animas Valley, New Mexico Author C. Smith Published New Mexico Geological Society Guidebook, 1978 DOI Not Provided Check for DOI...

331

Free-Electron Lasers: Present Status and Future Prospects  

E-Print Network (OSTI)

US Department of Energy under contract DE-AC03-76SF00098. LBL-29124 Free-Electron Lasers: Present Status

Kim, K.-J.

2008-01-01T23:59:59.000Z

332

Annual Hanford Site environmental permitting status report  

SciTech Connect

The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for the Hanford Facility is addressed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Pursuant to the Tri-Party Agreement, a single RCRA permit was issued by Ecology and the EPA to cover the Hanford Facility. The RCRA Permit, through the permit modification process, eventually will incorporate all TSD units.

Sonnichsen, J.C.

1998-09-17T23:59:59.000Z

333

UESC Status Data Collection and Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

| www1.eere.energy.gov/femp/ | www1.eere.energy.gov/femp/ UESC Status Data Collection and Analysis Jesse Feinberg Energetics, Incorporated April 14, 2010 Federal Energy Management Program | www1.eere.energy.gov/femp/ 2 * Why FEMP collects UESC data * Data trends - where are we now? * Incentives to sharing data Purpose Federal Energy Management Program | www1.eere.energy.gov/femp/ A one page history... UESCs authorized in Energy Policy Act of 1992 Agencies are authorized and encouraged to participate in programs to increase energy efficiency and for water conservation or the management of electricity demand conducted by gas, water, or electric utilities... No mandate to report UESC activity. FEMP tracks projects on voluntary basis. Steady reported growth of UESC financing vehicle for almost 20 years.

334

SF-4400-ATS Affidavit of Tax Status  

NLE Websites -- All DOE Office Websites (Extended Search)

ATS (07-2012) ATS (07-2012) SANDIA PROPRIETARY INFORMATION PERSONALLY IDENTIFIABLE INFORMATION (PII) (WHEN COMPLETE) Affidavit of Tax Status Benefits paid under a group health plan for your covered dependents who do not qualify for tax-free health coverage under the Internal Revenue Code causes you to receive additional compensation as taxable wages. Generally, same-gender domestic partners and their children do not qualify for tax-free health coverage and are, therefore, considered Non- Qualifying Dependents. You are required to declare as taxable income the value (imputed income) of the coverage for your Non-Qualifying Dependent(s). Imputed income is not a pay increase. It is the value of Sandia's contributions for medical (including the Health Reimbursement Account, if applicable), dental, and/or vision coverage for dependents who do not

335

Status Report, Environmental Protection Program - December 2005 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Protection Program - December 2005 Environmental Protection Program - December 2005 Status Report, Environmental Protection Program - December 2005 December 2005 Report on Implementation of DOE Order 450.1, Environmental Protection Program This report summarizes the observations and insights from evaluating the effectiveness of implementing select requirements of U.S. Department of Energy (DOE) Order 450.1 during Office of Independent Oversight environment, safety, and health (ES&H) management inspections conducted in 2005. Generally, the five sites' P2 programs have been implemented, although availability of resources varies. P2 requirements have been communicated actively and effectively through various mechanisms. Dedicated personnel support site-wide program activities and assist line organizations in

336

Hybrid Arc Cell Studies: Status Report  

SciTech Connect

I report on the status, at the end of FY12, of the studies of an arc cell for a hybrid synchrotron accelerating from 375 GeV/c to 750 GeV/c in momentum. Garren produced a complete lattice that gives a good outline of the structure of a hybrid synchrotron lattice. It is, however, lacking in some details: it does not maintain a constant time of flight, it lacks chromaticity correction, its cell structure is not ideal for removing aberrations from chromaticity correction, and it probably needs more space between magnets. I have begun studying cell structures for the arc cells to optimize the lattice performance and cost. I present some preliminary results for two magnets per half cell. I then discuss difficulties encountered, some preliminary attempts at resolving them, and the future plans for this work.

Berg J. S.

2012-09-28T23:59:59.000Z

337

Status of the SPP RFQ project  

E-Print Network (OSTI)

The SPP project at TAEK will use a 352.2 MHz 4-vane Radio Frequency Quadrupole (RFQ) to accelerate H+ ions from 20 keV to 1.5 MeV. With the design already complete, the project is at the test production phase. To this effect, a so called "cold model" of 50 cm length has been produced to validate the design approach, to perform the low power RF tests and to evaluate possible production errors. This study will report on the current status of the low energy beam transport line (LEBT) and RFQ cavity of the SPP project. It will also discuss the design and manufacturing of the RF power supply and its transmission line. In addition, the test results from some of the LEBT components will be shown and the final RFQ design will be shared.

Turemen, G; Yildiz, H; Alacakir, A; Unel, G

2014-01-01T23:59:59.000Z

338

US nuclear engineering education: Status and prospects  

SciTech Connect

This study, conducted under the auspices of the Energy Engineering Board of the National Research Council, examines the status of and outlook for nuclear engineering education in the United States. The study resulted from a widely felt concern about the downward trends in student enrollments in nuclear engineering, in both graduate and undergraduate programs. Concerns have also been expressed about the declining number of US university nuclear engineering departments and programs, the aging of their faculties, the appropriateness of their curricula and research funding for industry and government needs, the availability of scholarships and research funding, and the increasing ratio of foreign to US graduate students. A fundamental issue is whether the supply of nuclear engineering graduates will be adequate for the future. Although such issues are more general, pertaining to all areas of US science and engineering education, they are especially acute for nuclear engineering education. 30 refs., 12 figs., 20 tabs.

Not Available

1990-01-01T23:59:59.000Z

339

Current status of the GLASS code  

SciTech Connect

This paper summarizes the current status of the Generalized Lattice Analysis SubSystem (GLASS) computer code and its supporting cross section libraries. GLASS was developed at the Savannah River Site (SRS) in the early 1970's. The GLASS code has been instrumental in supporting safe Heavy Water Reactor (HWR) operations and predicting material production at SRS for more than 20 years. The Department of Energy Office of New Production Reactors (ONPR) program has chosen to use the GLASS code for the design of the HWR option of the New Production Reactor (NPR). A substantial body of validation calculations have been performed and additional validation calculations will be performed to qualify the new GLASS multigroup cross section libraries derived from the ENDF/B-5 and 6 nuclear data files. Several improvements to the code are in progress. Many other improvements are planned to bring GLASS up to modern physics and compute technology.

Hootman, H.E. (Westinghouse Savannah River Co., Aiken, SC (United States)); Honeck, H.C. (Computer Application Technology, Inc., Aiken, SC (United States))

1991-01-01T23:59:59.000Z

340

Current status of the GLASS code  

SciTech Connect

This paper summarizes the current status of the Generalized Lattice Analysis SubSystem (GLASS) computer code and its supporting cross section libraries. GLASS was developed at the Savannah River Site (SRS) in the early 1970`s. The GLASS code has been instrumental in supporting safe Heavy Water Reactor (HWR) operations and predicting material production at SRS for more than 20 years. The Department of Energy Office of New Production Reactors (ONPR) program has chosen to use the GLASS code for the design of the HWR option of the New Production Reactor (NPR). A substantial body of validation calculations have been performed and additional validation calculations will be performed to qualify the new GLASS multigroup cross section libraries derived from the ENDF/B-5 and 6 nuclear data files. Several improvements to the code are in progress. Many other improvements are planned to bring GLASS up to modern physics and compute technology.

Hootman, H.E. [Westinghouse Savannah River Co., Aiken, SC (United States); Honeck, H.C. [Computer Application Technology, Inc., Aiken, SC (United States)

1991-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

HARDWARE AND SOFTWARE STATUS OF QCDOC.  

SciTech Connect

QCDOC is a massively parallel supercomputer whose processing nodes are based on an application-specific integrated circuit (ASIC). This ASIC was custom-designed so that crucial lattice QCD kernels achieve an overall sustained performance of 50% on machines with several 10,000 nodes. This strong scalability, together with low power consumption and a price/performance ratio of $1 per sustained MFlops, enable QCDOC to attack the most demanding lattice QCD problems. The first ASICs became available in June of 2003, and the testing performed so far has shown all systems functioning according to specification. We review the hardware and software status of QCDOC and present performance figures obtained in real hardware as well as in simulation.

BOYLE,P.A.; CHEN,D.; CHRIST,N.H.; PETROV.K.; ET AL.

2003-07-15T23:59:59.000Z

342

Annual Hanford Site Environmental Permitting status report  

SciTech Connect

The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

SONNICHSEN, J.C.

1999-10-18T23:59:59.000Z

343

Gaseous-fuel safety assessment. Status report  

SciTech Connect

The Los Alamos National Laboratory, in support of studies sponsored by the Office of Vehicle and Engine Research and Development in the US Department of Energy, has undertaken a safety assessment of selected gaseous fuels for use in light automotive transportation. The purpose is to put into perspective the hazards of these fuels relative to present day fuels and delineated criteria for their safe handling. Fuels include compressed and liquified natural gas (CNG and LNG), liquefied petroleum gas (LPG), and for reference gasoline and diesel. This paper is a program status report. To date, physicochemical property data and general petroleum and transportation information were compiled; basic hazards defined; alternative fuels were safety-ranked based on technical properties alone; safety data and vehicle accident statistics reviewed; and accident scenarios selected for further analysis. Methodology for such analysis is presently under consideration.

Krupka, M.C.; Edeskuty, F.J.; Bartlit, J.R.; Williamson, K.D. Jr.

1982-01-01T23:59:59.000Z

344

Chapter 28 - Air Quality Status and Trends  

Science Journals Connector (OSTI)

Abstract This chapter describes the condition of air quality, based on air pollutant concentrations, i.e. criteria pollutants, in airsheds around the world, as well as certain air toxics in urban areas and hot spots. The variability of pollutant concentrations in space and time are discussed, as well as differences in air pollution between more industrialized and economically developed regions vs developing nations. The status and trends of atmospheric concentrations of tropospheric ozone, oxides of nitrogen, oxides of sulfur, carbon monoxide, lead, and particulate matter are discussed. Examples of air toxics include benzene, polycyclic aromatic hydrocarbons, dioxins, aldehydes, and metals, e.g. mercury. Regional and global trends include acid deposition, depletion of the stratospheric ozone layer, and climate change. Indoor air quality is discussed. The chapter concludes with a description of an air quality index.

Daniel Vallero

2014-01-01T23:59:59.000Z

345

Status of DOE A-76 Studies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE A-76 Studies DOE A-76 Studies (A/O July 15, 2008) Function Competition Affected FTE Status Savings RESL FY 07 Standard 19 Completed-Decision Jan. 2008 (MEO win) $4.9M Albany Research Center FY 06 Standard 74 Cancelled June 2007 Legacy Management FY 06 HPO 58 OMB approved HPO-June 2006 $16.5 DOE Logistics FY 02/03 Standard 144 Completed-Decision March 2006 (Contractor win) $1.6M New Brunswick Lab FY 04/05 Standard 40 Completed-Decision March 2006 (MEO win) $2.6M Environmental Engineering Services FY 04/05 Standard 684 CANCELLED September 2005 Information Technology FY 02/03 Standard 642 1000+ Contractors Completed-Decision July 2005 (MEO win) $456M ARC Logistics Standard 8 Completed-Decision March 2005 (MEO win) $0.8M Human Resources FY 02/03 Standard 146 Completed-Decision September

346

TRANSP and PTRANSP at PPPL: Status and Plans  

E-Print Network (OSTI)

TRANSP and PTRANSP at PPPL: Status and Plans Presented at the TRANSP Users Group Meeting, APS/DPP ­ Oct. 30, 2006 Poster ­ JP1.00121 D. McCune 1 #12;TRANSP and PTRANSP at PPPL: Status and Plans JP1. Randerson, PPPL ­ The PPPL TRANSP code suite is a set of tools for time dependent simulation of tokamak

Princeton Plasma Physics Laboratory

347

AGRICULTURE, 2008 Status of the Wisconsin Farm Economy  

E-Print Network (OSTI)

STATUS OF WISCONSIN AGRICULTURE, 2008 Status of the Wisconsin Farm Economy Situation and Outlook of Working Lands in Wisconsin · Hired Labor on Wisconsin Dairy Farms Department of Agricultural and Applied Economics College of Agricultural and Life Sciences University of Wisconsin-Madison Cooperative Extension

Radeloff, Volker C.

348

AGRICULTURE, 2005 Status of the Wisconsin Farm Economy  

E-Print Network (OSTI)

STATUS OF WISCONSIN AGRICULTURE, 2005 Status of the Wisconsin Farm Economy Situation and Outlook, and Specialization in the Wisconsin Dairy Industry · The Economic Importance of Value-added Agriculture in Wisconsin · The Economic Value of Wisconsin's Green Industry Department of Agricultural and Applied Economics College

Radeloff, Volker C.

349

Wisconsin Agriculture Status of the Wisconsin Farm Economy  

E-Print Network (OSTI)

STATUS OF Wisconsin Agriculture 2010 · Status of the Wisconsin Farm Economy · Current Outlook: Farm Products, Farm Inputs and the General Economy · Framing the Financial Crisis for Wisconsin Agriculture Department of Agricultural and Applied Economics College of Agricultural and Life Sciences University

Radeloff, Volker C.

350

AGRICULTURE, 2007 Status of the Wisconsin Farm Economy  

E-Print Network (OSTI)

STATUS OF WISCONSIN AGRICULTURE, 2007 Status of the Wisconsin Farm Economy Situation and Outlook and Challenges · Current Prospects for the 2007 Farm Bill Department of Agricultural and Applied Economics College of Agricultural and Life Sciences University of Wisconsin-Madison Cooperative Extension University

Radeloff, Volker C.

351

AGRICULTURE, 2006 Status of the Wisconsin Farm Economy  

E-Print Network (OSTI)

STATUS OF WISCONSIN AGRICULTURE, 2006 Status of the Wisconsin Farm Economy Situation and Outlook-Added Agriculture · Organic Farming in Wisconsin · A New Wisconsin Cooperative Law Department of Agricultural and Applied Economics College of Agricultural and Life Sciences University of Wisconsin-Madison Cooperative

Radeloff, Volker C.

352

Dirk Lipka, MDI, DESY Hamburg Status Cavity BPM's  

E-Print Network (OSTI)

Dirk Lipka, MDI, DESY Hamburg Status Cavity BPM's for E-XFEL #12;2 08.12.2009, FLASH seminar D. Lipka, MDI, DESY Hamburg Status Cavity BPM's Content 1. Requirements 2. Overview (all BPM's) 3. In kind contribution (Saclay, DESY, PSI) 4. Cavity BPM: principle 5. Design 6. Measurements: a. Laboratory measurements

353

Catherine Grant (MIT) Oct 31, 2005 ACIS: Instrument Status and  

E-Print Network (OSTI)

Catherine Grant (MIT) Oct 31, 2005 ACIS: Instrument Status and Performance Evolution Catherine Grant for the ACIS Instrument Team #12;ACIS Instrument Status Catherine Grant (MIT) Oct 31, 2005 Summary Catherine Grant (MIT) Oct 31, 2005 Monitoring Radiation Damage · Radiation damage can ­ Increase density

Grant, Catherine E.

354

Economic Consequences of Health Status: A Review of the Evidence  

E-Print Network (OSTI)

Economic Consequences of Health Status: A Review of the Evidence Amar A. Hamoudi and Jeffrey D Papers #12;CID Working Paper no. 30 Economic Consequences of Health Status: A Review of the Evidence Amar A. Hamoudi and Jeffrey D. Sachs Abstract The correlation between health and economic performance

355

Status of the Coral Reef Ecosystems of Guam  

E-Print Network (OSTI)

of U.S. and international coral reef ecosystems. The CRCA also required that the National OceanicStatus of the Coral Reef Ecosystems of Guam By Val Porter, Trina Leberer, Mike Gawel, Jay Gutierrez Marine Laboratory Technical Report No. 113 October 2005 #12;Status of the Coral Reef Ecosystems of Guam

Mcilwain, Jenny

356

Target selection and current status of structural genomics for the  

E-Print Network (OSTI)

33 Target selection and current status of structural genomics for the completed microbial genomes 3.2 Structural status of completed microbial genomes in the PDB................ 3.3 Metabolic pathways as targets for structural genomics.......................... 3.3.1 Glycolytic pathway

Babu, M. Madan

357

?-3 and ?-6 Polyunsaturated Fatty Acid Intakes and the Risk of Breast Cancer in Mexican Women: Impact of Obesity Status  

Science Journals Connector (OSTI)

...units), socioeconomic status, energy intake (continuous...no), and menopausal status. Linear trend tests...menopause, socioeconomic status, ever use of hormone...physical activity, energy intake (continuous...

Vronique Chajs; Gabriela Torres-Meja; Carine Biessy; Carolina Ortega-Olvera; Anglica Angeles-Llerenas; Pietro Ferrari; Eduardo Lazcano-Ponce; and Isabelle Romieu

2012-02-01T23:59:59.000Z

358

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statements and Environmental Assessments Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the status of ongoing NEPA documents at the Department of Energy, including the dates of important milestones in the NEPA process and references to more information (updated monthly). This chart represents anticipated activity and is not a commitment for documentation or date. Last Revised: 12/19/2013 StatusChart_December2013revised.pdf More Documents & Publications 2013 Annual Planning Summary for the Western Area Power Administration 2012 Annual Planning Summary for Western Area Power Administration 2011 ANNUAL PLANNING SUMMARY FOR ADVANCED RESEARCH AND PROJECTS AGENCY WESTERN AREA POWER ADMINISTRATION

359

Property:BLM LeaseStatus | Open Energy Information  

Open Energy Info (EERE)

LeaseStatus LeaseStatus Jump to: navigation, search Property Name BLM LeaseStatus Property Type String Description Status of lease at most recent import from LR2000 Allows Values Authorized, Cancelled, Closed, Expired, Pending, Rejected, Relinquished, Withdrawn This is a property of type String. The allowed values for this property are: Authorized Cancelled Closed Expired Pending Rejected Relinquished Withdrawn Retrieved from "http://en.openei.org/w/index.php?title=Property:BLM_LeaseStatus&oldid=600765" Categories: Properties BLM Lease Properties What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 1863120002 Varnish cache server

360

Assessment of Tumor Energy and Oxygenation Status by Bioluminescence, Nuclear Magnetic Resonance Spectroscopy, and Cryospectrophotometry  

Science Journals Connector (OSTI)

...Assessment of Tumor Energy and Oxygenation Status...Bioluminescence, Nuclear Magnetic Resonance...Assessment of tumor energy and oxygenation status...bioluminescence, nuclear magnetic resonance...Assessment of Tumor Energy and Oxyg nationStatus by Bioluminescence, Nuclear Magnetic Resonance...

W. Mueller-Klieser; C. Schaefer; S. Walenta; E. K. Rofstad; B. M. Fenton; and R. M. Sutherland

1990-03-15T23:59:59.000Z

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Neural substrates of social status inference: Roles of medial prefrontal cortex and superior temporal sulcus  

Science Journals Connector (OSTI)

The negotiation of social order is intimately connected to the capacity to infer and track status relationships. Despite the foundational role of status in social cognition, we know little about how the brain constructs status from social interactions ...

Malia Mason; Joe C. Magee; Susan T. Fiske

2014-05-01T23:59:59.000Z

362

The U.S. Nuclear Waste Technical Review Board Status Update ...  

Office of Environmental Management (EM)

The U.S. Nuclear Waste Technical Review Board Status Update The U.S. Nuclear Waste Technical Review Board Status Update The U.S. Nuclear Waste Technical Review Board Status Update...

363

Oropharyngeal Squamous Cell Carcinoma Treated With Radiotherapy or Radiochemotherapy: Prognostic Role of TP53 and HPV Status  

SciTech Connect

Purpose: To study the prognostic value of the TP53 mutation and human papilloma virus (HPV) status in oropharyngeal squamous cell carcinoma (OPSCC). Methods and materials: The TP53 mutation and HPV status were analyzed in 78 cases of locoregionally advanced OPSCC. The possible correlation of these factors with locoregiownal control, relapse-free survival, disease-specific survival, and overall survival (OS) was also investigated. Results: Of these 78 cases, 22 had disruptive and 22 had non-disruptive (silent) TP53 mutations; the remaining 34 cases had wild-type (WT) TP53. HPV 16 DNA was found in 9 cases (11%), but all HPV-positive (HPV+) cases carried a functional p53 protein, except for 1 case that had a silent mutation. HPV+ patients fared better than HPV-negative (HPV-) patients in terms of all survival parameters, with highly statistically significant differences between the groups. Specifically, no distant metastases were observed in the HPV+ patients, whereas they occurred in 17% of the HPV- patients. However, no difference was observed between the WT TP53 and mutation group, even when this was analyzed in terms of disruptive and non-disruptive mutations. Regardless, treatment with chemotherapy nearly doubled the 5-year OS rates, both in the mutation (42% vs. 22%) and WT (30 vs. 16%) group, but only the mutation group showed improvement in all survival parameters. In addition, the second tumor-free 5-year survival rate was 72% in HPV- cases, but no second tumors were observed in HPV+ and WT p53 cases. Conclusions: Patients with HPV+ OPSCC have an excellent prognosis after radiochemotherapy, but cisplatin-based chemotherapy may not confer a satisfactory outcome, especially in WT cases, thereby justifying the additional or alternative use of taxanes and epidermal growth factor receptors inhibitors. Uncommon distant metastases and second tumors in the HPV+ group may be cause for clinicians to review the follow-up policies in these patients.

Fallai, Carlo, E-mail: carlo.fallai@istitutotumori.mi.i [Radiation Oncology Department, Fondazione IRCCS, Istituto Nazionale Tumori, Milan (Italy); Perrone, Federica [Pathology Department, Fondazione IRCCS, Istituto Nazionale Tumori, Milan (Italy); Licitra, Lisa [Medical Oncology Department, Fondazione IRCCS, Istituto Nazionale Tumori, Milan (Italy); Pilotti, Silvana [Pathology Department, Fondazione IRCCS, Istituto Nazionale Tumori, Milan (Italy); Locati, Laura; Bossi, Paolo [Medical Oncology Department, Fondazione IRCCS, Istituto Nazionale Tumori, Milan (Italy); Orlandi, Ester; Palazzi, Mauro; Olmi, Patrizia [Radiation Oncology Department, Fondazione IRCCS, Istituto Nazionale Tumori, Milan (Italy)

2009-11-15T23:59:59.000Z

364

Barcoding Antarctic Biodiversity: current status and the CAML initiative, a case study of marine invertebrates  

Science Journals Connector (OSTI)

In recent decades, the importance of conserving global biodiversity has come to the publics attention,...1995). It has been realised that not enough is known about the abundance of the Earths species, many of w...

Rachel Anne Grant; Katrin Linse

2009-11-01T23:59:59.000Z

365

The Meaning, Status, and Future of Reproductive Autonomy: The Case of Alcohol Use during Pregnancy  

E-Print Network (OSTI)

abortions "necessary to preserve the life or health of the mother;" that health includes physical and mental health;

Thomas, Sue; Rickert, Lisa; Cannon, Carol

2006-01-01T23:59:59.000Z

366

The Meaning, Status, and Future of Reproductive Autonomy: The Case of Alcohol Use during Pregnancy  

E-Print Network (OSTI)

Supreme Court decisions. In Beal v. Doe, Maher v Roe, 2 9See id. at 900-01. 28. See Beal v. Doe, 432 U.S. 438 (1977).

Thomas, Sue; Rickert, Lisa; Cannon, Carol

2006-01-01T23:59:59.000Z

367

E-Print Network 3.0 - acid-induced status epilepticus Sample...  

NLE Websites -- All DOE Office Websites (Extended Search)

concentric ring electrodes for controlling pilocarpine generated status epilepticus in rats. Methods: Male... was able to control (modulate) status epilepticus ... Source: Besio,...

368

UNIT NAME -C-340 PCB Spill Site REGULATORY STATUS CERCLA LOCATION  

NLE Websites -- All DOE Office Websites (Extended Search)

NAME -C-340 PCB Spill Site REGULATORY STATUS CERCLA LOCATION C-340 Transformer area (Map locat1on 74 )- APPROXIMATE DIMENSIDNS Unnown - FUNCTION Scill site- OPERATIONAL STATUS NA...

369

Natural gas vehicles : Status, barriers, and opportunities.  

SciTech Connect

In the United States, recent shale gas discoveries have generated renewed interest in using natural gas as a vehicular fuel, primarily in fleet applications, while outside the United States, natural gas vehicle use has expanded significantly in the past decade. In this report for the U.S. Department of Energy's Clean Cities Program - a public-private partnership that advances the energy, economic, and environmental security of the U.S. by supporting local decisions that reduce petroleum use in the transportation sector - we have examined the state of natural gas vehicle technology, current market status, energy and environmental benefits, implications regarding advancements in European natural gas vehicle technologies, research and development efforts, and current market barriers and opportunities for greater market penetration. The authors contend that commercial intracity trucks are a prime area for advancement of this fuel. Therefore, we examined an aggressive future market penetration of natural gas heavy-duty vehicles that could be seen as a long-term goal. Under this scenario using Energy Information Administration projections and GREET life-cycle modeling of U.S. on-road heavy-duty use, natural gas vehicles would reduce petroleum consumption by approximately 1.2 million barrels of oil per day, while another 400,000 barrels of oil per day reduction could be achieved with significant use of natural gas off-road vehicles. This scenario would reduce daily oil consumption in the United States by about 8%.

Rood Werpy, M.; Santini, D.; Burnham, A.; Mintz, M.; Energy Systems

2010-11-29T23:59:59.000Z

370

Salt repository project closeout status report  

SciTech Connect

This report provides an overview of the scope and status of the US Department of Energy (DOE`s) Salt Repository Project (SRP) at the time when the project was terminated by the Nuclear Waste Policy Amendments Act of 1987. The report reviews the 10-year program of siting a geologic repository for high-level nuclear waste in rock salt formations. Its purpose is to aid persons interested in the information developed during the course of this effort. Each area is briefly described and the major items of information are noted. This report, the three salt Environmental Assessments, and the Site Characterization Plan are the suggested starting points for any search of the literature and information developed by the program participants. Prior to termination, DOE was preparing to characterize three candidate sites for the first mined geologic repository for the permanent disposal of high-level nuclear waste. The sites were in Nevada, a site in volcanic tuff; Texas, a site in bedded salt (halite); and Washington, a site in basalt. These sites, identified by the screening process described in Chapter 3, were selected from the nine potentially acceptable sites shown on Figure I-1. These sites were identified in accordance with provisions of the Nuclear Waste Policy Act of 1982. 196 refs., 21 figs., 11 tabs.

NONE

1988-06-01T23:59:59.000Z

371

US RERTR Program: overview, status and plans  

SciTech Connect

The status of the Reduced Enrichment Research and Test Reactor (RERTR) Program is reviewed. After a brief review of the accomplishments which the RERTR Program, in cooperation with its many international partners, had achieved by the end of 1983 in the area of LEU research reactor fuels development and application, emphasis is placed on the RERTR Program developments which took place during 1984 and on current plans and schedules. The RERTR progress in 1984 has been significant, with solid accomplishments and few surprises. Most LEU U/sub 3/Si/sub 2/-Al irradiation tests with 4.8 g U/cm/sup 3/ have been successfully completed, and contract negotiations are under way for the procurement of a whole-core demonstration of this fuel in the ORR. The demonstration is to begin in mid-1985 and to last for approximately eighteen months. Qualification of U/sub 3/Si/sub 2/-Al fuel with 7 g U/cm/sup 3/ is scheduled for 1989. International cooperation among fuel developers, commercial vendors, and reactor operators has been essential to the progress which has been achieved. With continued international cooperation, it will be feasible to significantly reduce HEU usage in research reactors in the next few years.

Travelli, A.

1984-01-01T23:59:59.000Z

372

CMS: Present status, limitations, and upgrade plans  

SciTech Connect

An overview of the CMS upgrade plans will be presented. A brief status of the CMS detector will be given, covering some of the issues we have so far experienced. This will be followed by an overview of the various CMS upgrades planned, covering the main motivations for them, and the various R&D efforts for the possibilities under study. The CMS detector has been working extremely well since the start of data-taking at the LHC as is evidenced by the numerous excellent results published by CMS and presented at this workshop and recent conferences. Less well documented are the various issues that have been encountered with the detector. In the spirit of this workshop I will cover some of these issues with particular emphasis on problems that motivate some of the upgrades to the CMS detector for this decade of data-taking. Though the CMS detector has been working extremely well and expectations are great for making the most of the LHC luminosity, there have been a number of issues encountered so far. Some of these have been described and while none currently presents a problem for physics performance, some of them are expected to become more problematic, especially at the highest Phase 1 luminosities for which the majority of the integrated luminosity will be collected. These motivate upgrades for various parts of the CMS detector so that the current excellent physics performance can be maintained or even surpassed in the realm of the highest Phase 1 luminosities.

Cheung, H.W.K.; /Fermilab; ,

2011-09-01T23:59:59.000Z

373

Status of the LBNE Neutrino Beamline  

SciTech Connect

The Long Baseline Neutrino Experiment (LBNE) will utilize a neutrino beamline facility located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a beam of neutrinos toward a detector placed at the Homestake Mine in South Dakota. The neutrinos are produced in a three-step process. First, protons from the Main Injector (60-120 GeV) hit a solid target and produce mesons. Then, the charged mesons are focused by a set of focusing horns into the decay pipe, towards the far detector. Finally, the mesons that enter the decay pipe decay into neutrinos. The parameters of the facility were determined taking into account several factors including the physics goals, the Monte Carlo modeling of the facility, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial beam power is expected to be {approx}700 kW, however some of the parameters were chosen to be able to deal with a beam power of 2.3 MW. We discuss here the status of the conceptual design and the associated challenges.

Papadimitriou, Vaia; /Fermilab

2011-12-01T23:59:59.000Z

374

Status of BINP proton tandem accelerator  

Science Journals Connector (OSTI)

The status of a unique 2.0MeV, 10mA proton tandem accelerator with vacuum insulation is presented. The accelerator is intended to be used in facilities generating resonant gamma rays for explosives detection and epithermal neutrons for boron neutron-capture therapy of brain tumors. A magnetically coupled DC voltage multiplier derived from an industrial ELV-type electron accelerator is used as a high voltage source for the accelerator. A dc high current negative ion source has been developed for injection into the tandem. In the tandem accelerator there is set of nested potential electrodes with openings which form a channel for accelerating the negative hydrogen ion beam and subsequently accelerating the proton beam after stripping in the gas target. The electrodes are connected to a high voltage feedthrough insulator to which required potentials are applied from the high voltage power supply by means of a resistor voltage divider. In the paper the first experimental results obtained with the vacuum insulated tandem accelerator are also given.

A. Burdakov; V. Davydenko; V. Dolgushin; A. Dranichnikov; A. Ivanov; J.P. Farrell; A. Khilchenko; V. Kobets; S. Konstantinov; A. Krivenko; A. Kudryavtsev; M. Tiunov; V. Savkin; V. Shirokov; I. Sorokin

2007-01-01T23:59:59.000Z

375

Status of UFD Campaign International Activities in Disposal Research |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status of UFD Campaign International Activities in Disposal Status of UFD Campaign International Activities in Disposal Research Status of UFD Campaign International Activities in Disposal Research Several international organizations have made significant progress in the characterization and performance evaluation of other disposal design options and host rock characteristics (clay/shale, granite), most of which were very different from those studied in the United States. The DOE recognizes that close international collaboration is a beneficial and cost effective strategy for advancing disposal science. This report describes the active collaboration opportunities available to U.S. researchers, and presents specific cooperative research activities that have been recently initiated within DOE's disposal research program.

376

Global Liquefied Natural Gas Market: Status and Outlook, The  

Reports and Publications (EIA)

The Global Liquefied Natural Gas Market: Status & Outlook was undertaken to characterize the global liquefied natural gas (LNG) market and to examine recent trends and future prospects in the LNG market.

2003-01-01T23:59:59.000Z

377

UNIT NAME: C-726 Sandblastina Facility REGULATORY STATUS: AOC  

NLE Websites -- All DOE Office Websites (Extended Search)

172 1012,'92 UNIT NAME: C-726 Sandblastina Facility REGULATORY STATUS: AOC LOCATION Inside Security Fence, center "of plant at the interseion of Virginia and lOth street....

378

Radiological Final Status Survey of the Hammond Depot, Hammond, Indiana  

SciTech Connect

ORISE conducted extensive scoping, characterization, and final status surveys of land areas and structures at the DNSCs Hammond Depot located in Hammond, Indiana in multiple phases during 2005, 2006 and 2007.

T.J. Vitkus

2008-04-07T23:59:59.000Z

379

UNIT NAME: C-637 septic System REGULATORY STATUS: AOC  

NLE Websites -- All DOE Office Websites (Extended Search)

93 UNIT NUMBER: 189 UNIT NAME: C-637 septic System REGULATORY STATUS: AOC LOCATION: Inside plant security fence, east of the c-637 Cooling Tower Pumphouse. 50 feet wide by 100 feet...

380

Nuclear Safety Research and Development Status Workshop Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NSR&D STATUS WORKSHOP SUMMARIES Caroline Garzon Chief of Nuclear Safety Staff NUCLEAR SAFETY R&D Perform a peer review of Risk Assessment Corporation WTP analysis by a team and...

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Advancing Towards a Hydrogen Energy Economy: Status, Opportunities and Barriers  

Science Journals Connector (OSTI)

Performance reliability advances and cost reductions have been achieved with hydrogen and fuel cell technologies in both the ... sectors. This paper reviews the status of hydrogen and fuel cell technologies, iden...

Robert K. Dixon

2007-03-01T23:59:59.000Z

382

Wind Energy Status and Future Wind Engineering Challenges: Preprint  

SciTech Connect

This paper describes the current status of wind energy technology, the potential for future wind energy development and the science and engineering challenges that must be overcome for the technology to meet its potential.

Thresher, R.; Schreck, S.; Robinson, M.; Veers, P.

2008-08-01T23:59:59.000Z

383

RENEWABLES 2005 GLOBAL STATUS REPORT Notes and References Companion Document  

E-Print Network (OSTI)

...................................................................................................3 N2. Primary Energy from Renewable Energy Energy Compared with Fossil Fuels and Nuclear Power N12. Global Investment in Renewable Energy1 RENEWABLES 2005 GLOBAL STATUS REPORT Notes and References Companion Document October 20, 2005

Kammen, Daniel M.

384

Status of the KTeV Experiment at Fermilab  

E-Print Network (OSTI)

The KTeV experiment is a fixed target experiment at Fermilab. Its primary goal is the search for direct CP violation in the decay of neutral kaons. Its current status and some preliminary results will be discussed.

R. Ben-David; representing the KTeV collaboration

1998-01-06T23:59:59.000Z

385

Published in : Environmental Research Status: Postprint (Author's version)  

E-Print Network (OSTI)

Published in : Environmental Research Status: Postprint (Author's version) Pesticide exposure Abstract Context: Chlordecone, an environmentally persistent organochlorine insecticide used intensively in banana culture in the French West Indies until 1993, has permanently polluted soils and contaminated

Boyer, Edmond

386

Green Power Marketing in the United States: A Status Report ...  

NLE Websites -- All DOE Office Websites (Extended Search)

A2-44094 October 2008 Green Power Marketing in the United States: A Status Report (11th Edition) Lori Bird, Claire Kreycik, and Barry Friedman Green Power Marketing in the United...

387

Waste Isolation Pilot Plant Status and Plans - 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WIPP Status and Plans WIPP Status and Plans - WIPP Status and Plans WIPP Status and Plans - - 2010 2010 National Transportation Stakeholders Forum National Transportation Stakeholders Forum Chicago, Illinois Chicago, Illinois May 26, 2010 May 26, 2010 Dr. Dave Moody Dr. Dave Moody Manager Manager Carlsbad Field Office Carlsbad Field Office May 26, 2010 May 26, 2010 Transportation Success * First shipment to WIPP departed Los Alamos National Laboratory on March 25, 1999 * WIPP honored with U.S. Transport Council award for transportation safety in January 2009 * More than 8,500 shipments h i d f l "...The [WIPP transportation] system is safer than that have arrived safely * Surpassed 10 million loaded miles to WIPP * Many others 2 employed for any other hazardous material in the U.S...." National Academy of Sciences,

388

Status of the eel stock in Sweden in 2011  

E-Print Network (OSTI)

Status of the eel stock in Sweden in 2011 Willem Dekker Håkan Wickström Jan Andersson Aqua reports of the eel stock in Sweden in 2011 By Willem Dekker, Håkan Wickström & Jan Andersson October 2011 SLU: Dekker, W., Wickström, H. & Andersson, J. (2011). Status of the eel stock in Sweden in 2011. Aqua reports

389

Alternatives to incineration. Technical area status report  

SciTech Connect

Recently, the DOE`s Mixed Waste Integrated Program (MWIP) (superseded by the Mixed Waste Focus Area) initiated an evaluation of alternatives to incineration to identify technologies capable of treating DOE organically contaminated mixed wastes and which may be more easily permitted. These technologies have the potential of alleviating stakeholder concerns by decreasing off-gas volurties and the associated emissions of particulates, volatilized metals and radionuclides, PICs, NO{sub x}, SO{sub x}, and recombination products (dioxins and furans). Ideally, the alternate technology would be easily permitted, relatively omnivorous and effective in treating a variety of wastes with varying constituents, require minimal pretreatment or characterization, and be easy to implement. In addition, it would produce secondary waste stream volumes significantly smaller than the original waste stream, and would minimize the environmental health and safety effects on workers and the public. The purpose of this report is to provide an up-to-date (as of early 1995) compendium of iternative technologies for designers of mixed waste treatment facilities, and to identify Iternate technologies that may merit funding for further development. Various categories of non-thermal and thermal technologies have been evaluated and are summarized in Table ES-1. Brief descriptions of these technologies are provided in Section 1.7 of the Introduction. This report provides a detailed description of approximately 30 alternative technologies in these categories. Included in the report are descriptions of each technology; applicable input waste streams and the characteristics of the secondary, or output, waste streams; the current status of each technology relative to its availability for implementation; performance data; and costs. This information was gleaned from the open literature, governments reports, and discussions with principal investigators and developers.

Schwinkendorf, W.E. [BDM Federal, Inc., Albuquerque, NM (United States); McFee, J.; Devarakonda, M. [International Technology Corp., Albuquerque, NM (United States); Nenninger, L.L.; Fadullon, F.S. [Science Applications International Corp., Gaithersburg, MD (United States); Donaldson, T.L. [Oak Ridge National Lab., TN (United States); Dickerson, K. [Oak Ridge National Lab., TN (United States); [Rocky Flats Environmental Technology Site, Golden, CO (United States)

1995-04-01T23:59:59.000Z

390

W-519 Sagebrush Mitigation Project FY-2004 Final Review and Status  

SciTech Connect

This report summarizes activities conducted as mitigation for loss of sagebrush-steppe habitats due to Project W-519, the construction of the infrastructure for the Tank Waste Remediation System Vitrification Plant. The focus of this report is to provide a review and final status of mitigation actions performed through FY2004. Data collected since FY1999 have been included where appropriate. The Mitigation Action Plan (MAP) for Project W-519 prescribed three general actions to be performed as mitigation for the disturbance of approximately 40 ha (100 acres) of mature sagebrush-steppe habitat. These actions included: (1) transplanting approximately 130,000 sagebrush seedlings on the Fitzner-Eberhardt Arid Lands Ecology Reserve (ALE); (2) rectification of the new transmission line corridor via seeding with native grasses and sagebrush; and (3) research on native plant species with a goal of increasing species diversity in future mitigation or restoration actions. Nearly 130,000 Wyoming big sagebrush seedlings where planted on ALE during FY2000 and FY2001. About 39,000 of those seedlings were burned during the 24-Command Fire of June 2000. The surviving and subsequent replanting has resulted in about 91,000 seedlings that were planted across four general areas on ALE. A 50% survival rate at any monitoring period was defined as the performance standard in the MAP for this project. Data collected in 2004 indicate that of the over 5000 monitored plants, 51.1% are still alive, and of those the majority are thriving and blooming. These results support the potential for natural recruitment and the ultimate goal of wildlife habitat replacement. Thus, the basic performance standard for sagebrush survival within the habitat compensation planting has been met. Monitoring activities conducted in 2004 indicate considerable variation in seedling survival depending on the type of plant material, site conditions, and to a lesser extent, treatments performed at the time of planting. The principle findings include: (1) a clear indication that in most settings, bare-root seedling survival is considerably higher than tubling survival; (2) we can expect low plant survival at sites with a high cover of large native bunchgrasses--especially bluebunch wheatgrass; (3) mycorrhizal root treatments appeared to increase growth and survival at the Coppice Dune and 98-Burn Undisturbed sites, but appeared to have little effect at the 98-Burn Disturbed, 111-Road Sitanion, or Cold Creek sites; (4) use of a hydrogel dip at planting increases survival of bare-root plants compared to dipping roots in plain water; (5) reducing leaf area via clipping after planting did not increase survival of bare-root plants; (6) seedlings planted on a south-aspect hillside at the Lower Cold Creek planting area had higher survival than seedlings planted on the hilltop or northern-aspects although these survival rates were lower than the survival rate down on the flats at this same location. Rectification of the transmission line corridor occurred in early March 2001, with the broadcast seeding of Sandberg's bluegrass and sagebrush. Success criteria for this site-of-disturbance rectification required a grass establishment after four years with greater than 25% total canopy cover with 60% of the plant cover from planted species (DOE 1998). This planting met the total canopy criterion but failed the criterion of 60% relative coverage of planted species. Although the performance standard was not met, the planting is not necessarily a failure; the communities on the tower pads appear to be developing toward the desired end state. We feel that there are no reasonable mitigative actions that can be taken at this time that would significantly alter or speed up the plant community development on these sites. In fact, most options, such as overseeding, may cause damage to the currently establishing communities on those sites.

Durham, Robin E.; Sackschewsky, Michael R.

2004-09-30T23:59:59.000Z

391

Language and Immigrant Status Effects on Disparities in Hispanic Childrens Health Status and Access to Health Care  

Science Journals Connector (OSTI)

The objective of this study is to estimate Hispanic/non-Hispanic (nH)-white health disparities and assess ... disparities can be explained by immigrant status and household primary language. The 2007 National Sur...

Rosa M. Avila; Matthew D. Bramlett

2013-04-01T23:59:59.000Z

392

POLICY GUIDANCE MEMORANDUM #08 DOE Fair Labor Standards Act (FLSA) Exempt/Non-Exempt Status Determination  

Energy.gov (U.S. Department of Energy (DOE))

This memorandum provides guidance on determining an employee's Fair Labor Standards Act status within the Department.

393

Status Report and Proposal Concerning the Supply of Depleted Uranium Metal Bands for a Particle Detector  

E-Print Network (OSTI)

Status Report and Proposal Concerning the Supply of Depleted Uranium Metal Bands for a Particle Detector

1980-01-01T23:59:59.000Z

394

In Case of Emergency  

NLE Websites -- All DOE Office Websites (Extended Search)

In Case of Emergency In Case of Emergency Print FirePolice Emergency: ext. 7911 Cell phone or off-site: 510-486-7911 When dialing from off-site, the following numbers need to be...

395

The Woodlands Metro Center energy study. Case studies of project planning and design for energy conservation  

SciTech Connect

The Woodlands is a HUD Title VII New Town located near Houston, including 22,000 acres; the plan for the new town consists of 6 residential villages, a town center (Metro), and a Trade Center for larger-scale industrial use. Included within the program for each village are schools and commercial activities, as well as employment activities. The Woodlands is planned to be developed over a 26-year period (commenced in 1972) with an ultimate population of 150,000. Following a summary chapter, Chapter II presents background material on The Woodlands and results of the study are summarized. Chapter III describes the project team and its organizational structure. Chapter IV outlines and documents the methodology that was employed in developing, analyzing, and evaluating the case study. The next chapter describes and analyzes the conventional plan, documents the process by which energy-conserving methods were selected, and evaluates the application of these methods to the Metro Center Study area. Chapter VI discusses constraints to implementation and is followed by a final chapter that presents the general conclusions from the case study and suggests directions for further investigation.

Not Available

1980-03-01T23:59:59.000Z

396

Status Report, Department of Energy's Chronic Beryllium Disease Prevention  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status Report, Department of Energy's Chronic Beryllium Disease Status Report, Department of Energy's Chronic Beryllium Disease Prevention Program - February 2006 Status Report, Department of Energy's Chronic Beryllium Disease Prevention Program - February 2006 February 2006 Report on Implementation of 10 CFR Part 850, Chronic Beryllium Disease Prevention Program During calendar year 2005, the Office of Independent Oversight, within the Office of Security and Safety Performance Assurance, evaluated the effectiveness of U.S. Department of Energy (DOE) chronic beryllium disease protection programs (CBDPPs) at five sites as part of regularly scheduled inspections. These reviews focused on site programs for ensuring that workers are protected in accordance with the requirements of 10 CFR 850. This report summarizes the observations, insights, and lessons learned from

397

Current Status of Energy Efficiency in South Africa (Presentation) | Open  

Open Energy Info (EERE)

Current Status of Energy Efficiency in South Africa (Presentation) Current Status of Energy Efficiency in South Africa (Presentation) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Spain Installed Wind Capacity Website Focus Area: Renewable Energy Topics: Market Analysis Website: www.gwec.net/index.php?id=131 Equivalent URI: cleanenergysolutions.org/content/spain-installed-wind-capacity-website Language: English Policies: Regulations Regulations: Feed-in Tariffs This website presents an overview of total installed wind energy capacity in Spain per year from 2000 to 2010. The page also presents the main market developments from 2010; a policy summary; a discussion of the revision in feed-in tariffs in 2010; and a future market outlook. References Retrieved from "http://en.openei.org/w/index.php?title=Current_Status_of_Energy_Efficiency_in_South_Africa_(Presentation)&oldid=514359"

398

Status Report, Essential System Functionality - January 2006 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status Report, Essential System Functionality - January 2006 Status Report, Essential System Functionality - January 2006 Status Report, Essential System Functionality - January 2006 Report on Essential System Functionality In 2004 and 2005, the Office of Independent Oversight, within the Office of Security and Safety Performance Assurance, performed ten evaluations of essential system functionality (ESF). These ESF reviews are highly technical, detailed engineering evaluations of selected essential systems within one or more facilities at each site. This report summarizes the observations and insights from these reviews. Although most essential safety systems that were reviewed were well maintained, tested, and operated, there were significant weaknesses in some aspects of engineering design and analysis that, for some safety systems,

399

Project Status | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects, Projects, Missions, and Status High Energy Physics (HEP) HEP Home About Research Facilities Facility Ops Experiments at the Energy Frontier Experiments at the Intensity Frontier Experiments at the Cosmic Frontier Projects, Missions, and Status HEP User Facilities Science Highlights Benefits of HEP Funding Opportunities Advisory Committees News & Resources Contact Information High Energy Physics U.S. Department of Energy SC-25/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3624 F: (301) 903-2597 E: sc.hep@science.doe.gov More Information » Facilities Projects, Missions, and Status Print Text Size: A A A RSS Feeds FeedbackShare Page The Office of High Energy Physics supports the construction of new facilities and major experimental equipment to advance the field of high

400

Status Report, Department of Energy's Chronic Beryllium Disease Prevention  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status Report, Department of Energy's Chronic Beryllium Disease Status Report, Department of Energy's Chronic Beryllium Disease Prevention Program - February 2006 Status Report, Department of Energy's Chronic Beryllium Disease Prevention Program - February 2006 February 2006 Report on Implementation of 10 CFR Part 850, Chronic Beryllium Disease Prevention Program During calendar year 2005, the Office of Independent Oversight, within the Office of Security and Safety Performance Assurance, evaluated the effectiveness of U.S. Department of Energy (DOE) chronic beryllium disease protection programs (CBDPPs) at five sites as part of regularly scheduled inspections. These reviews focused on site programs for ensuring that workers are protected in accordance with the requirements of 10 CFR 850. This report summarizes the observations, insights, and lessons learned from

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Microsoft Word - 2006 Status Report_final.doc  

Office of Legacy Management (LM)

Annual Status Report - Salt Lake City, Utah Annual Status Report - Salt Lake City, Utah November 2006 Page 1 2006 Annual Status Report for the Salt Lake City, Utah, UMTRCA Title I Processing Site Summary The second year of reduced ground water monitoring at the Salt Lake City Processing Site was conducted on July 25, 2006. Reduced ground water monitoring was performed as recommended by the State of Utah Department of Environmental Quality, Division of Radiation Control (Utah DEQ/DRC) and directed by the U.S. Nuclear Regulatory Commission (NRC) per letter dated December 15, 2005. Monitor wells were in excellent condition. Water quality results indicate that molybdenum concentrations in ground water continue to be below the maximum concentration limit (MCL) in shallow aquifer well MW-0144. Ground water level data were collected in conjunction with the

402

Status of Direct Heat Application Projects | Open Energy Information  

Open Energy Info (EERE)

Heat Application Projects Heat Application Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Status of Direct Heat Application Projects Abstract In order to promote the use of hydrothermal energy for direct heat applications, the U.S. Department of Energy (DOE) has funded twenty-two demonstration projects. Eight of these projects are administered by the San Francisco Operation Office of the Department of Energy (DOE-SAN) with technical support form the Energy Technology Engineering Center (ETEC) of Rockwell International. The projects are described and their status given. Author Kendal S. Robinson Published Journal Geothermal Resources Council Transactions, 1981 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Status of Direct Heat Application Projects

403

Status Report, Department of Energy - March 2006 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status Report, Department of Energy - March 2006 Status Report, Department of Energy - March 2006 Status Report, Department of Energy - March 2006 March 2006 Report on Safety System Engineer and Oversight Programs In the period October 2004 to March 2006, the Office of Independent Oversight, within the Office of Security and Safety Performance Assurance, evaluated system engineer and safety system oversight (SSO) programs at eight sites. This report summarizes the observations and insights about safety system engineer and oversight programs based on these evaluations and review of related U.S. Department of Energy (DOE) requirements, guidance, and other supporting documents. DOE field offices have defined sites-specific SSO programs, assigned responsibilities and resources, and established qualification requirements,

404

Microsoft Word - Instrument Status - January 2007 formatted.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

ACRF Instrumentation Status: New, Current, and Future January 2007 James Liljegren ACRF Instrument Team Coordinator Work supported by the U.S. Department of Energy, Office of Science, Office of Biological and Environmental Research Summary The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Program Climate Research Facility instrumentation status. The report is divided into four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development. New information is highlighted in

405

ARM - Publications: Science Team Meeting Documents: The Status of the  

NLE Websites -- All DOE Office Websites (Extended Search)

The Status of the Broadband Heating Rate Profile (BBHRP) Project The Status of the Broadband Heating Rate Profile (BBHRP) Project Mlawer, Eli Atmospheric & Environmental Research, Inc. Miller, Mark Brookhaven National Laboratory Shippert, Timothy Pacific Northwest National Laboratory Turner, David Pacific Northwest National Laboratory Xie, Shaocheng Lawrence Livermore National Laboratory Johnson, Karen Brookhaven National Laboratory Clough, Shepard Atmospheric and Environmental Research Zhang, Minghua State University of New York at Stony Brook Long, Chuck Pacific Northwest National Laboratory Delamere, Jennifer Atmospheric and Environmental Research, Inc. Troyan, David Brookhaven National Laboratory Bartholomew, Mary Jane Brookhaven National Laboratory Flynn, Connor Pacific Northwest National Laboratory

406

Requirements for status for volume fuel cell manufacturing  

NLE Websites -- All DOE Office Websites (Extended Search)

Status for Volume Status for Volume Fuel Cell Manufacturing DOE Hydrogen Program, Washington, DC July 13-14, 2005 Requirements for Manufactured Fuel Cells Customer Requirements: Commercial Plant Study - Volume: 250,000 fuel stacks per year - Cost: $30/kw net Requirements for Manufactured Fuel Cells Commercial Volume Manufacturing - Material Utilization: >85% - Controlled Environments (Humidity, temperature, dust) - Environmentally safe direct and indirect materials - Hydrogen safety - Make or Buy Decisions on non/proprietary unit cell components - Integrated strategic supply chain - Design for Manufacturing, Assembly, and Service Requirements for Manufactured Fuel Cells Quality Control & Assurance - Accelerated tests and process parameters correlated to key product requirements (QFD)

407

Status of the Broadband Heating Rate Profile (BBHRP) VAP  

NLE Websites -- All DOE Office Websites (Extended Search)

Status of the Broadband Heating Rate Profile (BBHRP) VAP Status of the Broadband Heating Rate Profile (BBHRP) VAP Mlawer, Eli Atmospheric & Environmental Research, Inc. Clough, Shepard Atmospheric and Environmental Research Delamere, Jennifer Atmospheric and Environmental Research, Inc. Miller, Mark Brookhaven National Laboratory Johnson, Karen Brookhaven National Laboratory Troyan, David Brookhaven National Laboratory Jensen, Michael Brookhaven National Laboratory Shippert, Timothy Pacific Northwest National Laboratory Long, Chuck Pacific Northwest National Laboratory Flynn, Connor Pacific Northwest National Laboratory Sivaraman, Chitra Pacific Northwest National Laboratory Turner, David University of Wisconsin-Madison Heck, Patrick University of Wisconsin Rutan, David Analytical Services & Materials, Inc.

408

Microsoft Word - Instrument Status - Nov-Dec 2006 formatted .doc  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 ACRF Instrumentation Status: New, Current, and Future November-December 2006 James Liljegren ACRF Instrument Team Coordinator Work supported by the U.S. Department of Energy, Office of Science, Office of Biological and Environmental Research Summary The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Program Climate Research Facility instrumentation status. The report is divided into four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development. New information is highlighted in

409

Light-duty diesel engine development status and engine needs  

SciTech Connect

This report reviews, assesses, and summarizes the research and development status of diesel engine technology applicable to light-duty vehicles. In addition, it identifies specific basic and applied research and development needs in light-duty diesel technology and related health areas where initial or increased participation by the US Government would be desirable. The material presented in this report updates information provided in the first diesel engine status report prepared by the Aerospace Corporation for the Department of Energy in September, 1978.

Not Available

1980-08-01T23:59:59.000Z

410

Core-debris accommodation research: status and plans. [LMFBR  

SciTech Connect

The results of a recent task force study to review the US DOE core-debris accommodation program are presented. The status of technology for in-vessel retention, debris carryover, and ex-vessel retention is summarized. The potential safety issues and the research and development needs are reviewed and a series of tasks and facility requirements are defined. The status of particulate debris-bed coolability experiments are reviewed in detail. Possible mechanisms which might prevent channel formation in debris beds are identified, and the results of the investigation are presented. The effect of stratification and the method of stratification on debris coolability are demonstrated.

Baker, L. Jr.; Pedersen, D.R.; Sowa, E.S.; Gabor, J.D.; Alter, H.

1982-01-01T23:59:59.000Z

411

Case Studies by System  

Energy.gov (U.S. Department of Energy (DOE))

Case studies document the energy savings achieved by large manufacturing companies using AMO's software tools, other technical publications, and best practices.

412

A Case for Ethics  

Science Journals Connector (OSTI)

A Case for Ethics ... As active members of the scientific community, graduate students make ethical judgments about the conduct and presentation of their research. ...

David H. Smith; Brian P. Coppola

1996-01-01T23:59:59.000Z

413

OSCARS Case Study  

NLE Websites -- All DOE Office Websites (Extended Search)

OSCARS Case Study Engineering Services The Network OSCARS How It Works Who's Using OSCARS? OSCARS and Future Tech OSCARS Standard and Open Grid Forum OSCARS Developers Community...

414

Project Finance Case Studies  

Energy.gov (U.S. Department of Energy (DOE))

Presentation covers the Project Finance Case Studies and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

415

The National Ignition Campaign: status and progress  

Science Journals Connector (OSTI)

The National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) has been operational since March 2009 and a variety of experiments have been completed and many more are planned in support of NIF's mission areas: national security, fundamental science, and fusion energy. NIF capabilities and infrastructure are in place to support all of its missions with nearly 60 x-ray, optical and nuclear diagnostic systems and the ability to shoot cryogenic targets and DT layered capsules. The NIF has also been qualified for the use of tritium and other special materials as well as to perform high-yield experiments and classified experiments. Implosions with record indirect-drive neutron yield of 7.5?1014 neutrons have been achieved. NIF, a Nd?:?Glass laser facility, is routinely operating at 1.6MJ of ultraviolet (3?) light on target with very high reliability. It recently reached its design goal of 1.8MJ and 500TW of 3? light on target, and has performed target experiments with 1.9MJ at peak powers of 410TW. The National Ignition Campaign (NIC), an international effort with the goal of demonstrating thermonuclear burn in the laboratory, is making steady progress towards achieving ignition. Other experiments have been completed in support of high-energy science, materials equation of state, and materials strength. In all cases, records of extreme temperatures and pressures, highest neutron yield and highest energy densities have been achieved. This paper describes the unprecedented experimental capabilities of the NIF and the results achieved so far on the path towards ignition.

E.I. Moses; the NIC Collaborators

2013-01-01T23:59:59.000Z

416

Ode to the case report  

E-Print Network (OSTI)

JP. In defense of case reports and case series. Ann InternIJ. Evidence based case reports. Undergraduates in Cork have2. Vandenbroucke JP. Case reports of suspected adverse drug

Rosen, Ted

2008-01-01T23:59:59.000Z

417

Status of Research on Fusion Energy and Plasma Turbulence  

E-Print Network (OSTI)

1020 6 X 1030 R (m) ~ 108 1 10-4 E (sec) > 1013 2 10-10 Three Types of Fusion PowerThree TypesStatus of Research on Fusion Energy and Plasma Turbulence Candy, Waltz (General Atomics) Greg://www.cmpd.umd.edu & Plasma Microturbulence Project http://fusion.gat.com/theory/pmp (General Atomics, U. Maryland, LLNL, PPPL

Hammett, Greg

418

Status of TRANSP Presented at the TRANSP Users  

E-Print Network (OSTI)

. Indireshkumar, C. Ludescher-Furth, L. Randerson, PPPL ­ The status of the TRANSP integrated tokamak modeling2, ORBIT, M3D... (Could also be FusionGrid Services). *FusionGrid TRANSP on PPPL servers MDS+ MDS: ­ 2 years, $640K/year, PPPL, GA, LLNL, Lehigh. ­ Leverage NTCC, FusionGrid and experimental support

Princeton Plasma Physics Laboratory

419

November 15, 1999 TAX EXEMPT STATUS OF UNIVERSITY OF COLORADO  

E-Print Network (OSTI)

November 15, 1999 TAX EXEMPT STATUS OF UNIVERSITY OF COLORADO The University of Colorado, as a public institution of higher education of the State of Colorado, is exempt from all federal excise taxes under Chapters 32 and 33 of the Internal Revenue Code and from all Colorado State and local government

Ryan, Joe

420

October 2010 BBA Convocation Survey: Career Status Report  

E-Print Network (OSTI)

Part-time Contract Self-employed October 2010 Employment Statistics** PART I: EMPLOYMENT STATUS of the October 2010 SFU Business Career Management Centre Statistics shows that 55% of SFU Business students are already employed upon graduation and 42% are seeking employment. The majority of the students surveyed

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Solar Energy Status and Perspectives Peter Ahm, Director  

E-Print Network (OSTI)

Solar Energy ­ Status and Perspectives Peter Ahm, Director PA Energy A/S (Ltd.) Snovdrupvej 16, DK energy in terms of thermal Solar Hot Water systems and electricity producing Photovoltaics contribute at present only to the global energy supply at a fraction of 1 %. However, the potential for solar energy

422

UCPath Project Status Report Report Date August 23, 2013  

E-Print Network (OSTI)

unfilled critical positions. Development of UCPath Center operating procedures. UCPath project health check1 UCPath Project Status Report Report Date August 23, 2013 Project Director Anthony Lo Anthony.Lo@ucop.edu Executive Sponsors Nathan Brostrom Peter Taylor Project Summary Tony Lo has resigned as Project Director

Russell, Lynn

423

Accelerators of ELV-type Status, development, applications  

E-Print Network (OSTI)

Accelerators of ELV-type Status, development, applications In the work presented here the parameters of powerful electron accelerators of con- tinuous action are given and the main systems of the accelerator and a wide set of sup- plementary devices extending the application range of the accelerator

424

National Fuel Cell Vehicle Learning Demonstration: Status and Results (Presentation)  

SciTech Connect

The objectives of this paper are: (1) validate H{sub 2} FC vehicles and infrastructure in parallel; (2) identify current status and evolution of the technology; (3) objectively assess progress toward technology readiness; and (4) provide feedback to H{sub 2} research and development.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Garbak, J.

2009-04-22T23:59:59.000Z

425

ACRF Instrumentation Status: New, Current, and Future January 2007  

SciTech Connect

The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Program Climate Research Facility instrumentation status. The report is divided into four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development.

JC Liljegren

2007-01-01T23:59:59.000Z

426

Status of the MCNP{trademark}/LCS{trademark} merger project  

SciTech Connect

The MCNPX code is now in limited release in a beta-test version. We provide a brief status report on the physics modules now in the code and of the enhanced capabilities to use new evaluated neutron data. We also present new benchmark calculations in which LAHET and MCNPX are compared with experimental results from the Japan Atomic Energy Research Institute.

Hughes, H.G.; Adams, K.J.; Chadwick, M.B.; Comly, J.C.; Frankle, S.C.; Hendricks, J.S.; Little, R.C.; Prael, R.E.; Waters, L.S.; Young, P.G.

1998-04-19T23:59:59.000Z

427

California's Renewables Portfolio Standard (RPS) List of Facilities Certification Status  

E-Print Network (OSTI)

California's Renewables Portfolio Standard (RPS) List of Facilities Certification Status Terms Facility State Facility County Commercial Operations Date Nameplate Capacity Technology Eligibility Date-Certification High Desert Solar One - HDSO Victorville CA San Bernardino 1/1/2007 101 Solar Thermal Electric 8

428

Operations Training Program Status Report 1/28/99  

E-Print Network (OSTI)

Operations Training Program Status Report 1/28/99 Michael Spata Operations Deputy Group Leader Following is a description of the various aspects of the Operations Group Training program. While most for providing on-the-job training in accelerator specific topics. The mentor will also be able to certify

429

Fuel Cell Technology Status Analysis Project: Partnership Opportunities (Fact Sheet)  

SciTech Connect

This fact sheet describes the National Renewable Energy Laboratory's (NREL's) Fuel Cell Technology Status Analysis Project. NREL is seeking fuel cell industry partners from the United States and abroad to participate in an objective and credible analysis of commercially available fuel cell products to benchmark the current state of the technology and support industry growth.

Not Available

2014-11-01T23:59:59.000Z

430

Ocean Wave Converters: State of the Art and Current Status  

E-Print Network (OSTI)

Ocean Wave Converters: State of the Art and Current Status M.S. Lagoun1,2 , A. Benalia2 and M in one of the following categories: wave energy, marine and tidal current energy, ocean thermal energy of energy exists in oceans. Ocean energy exists in many forms. Among these forms, significant opportunities

Paris-Sud XI, Université de

431

Status of shell galaxies Jean-Louis Prieur  

E-Print Network (OSTI)

Status of shell galaxies Jean-Louis Prieur European Southern Observatory, Karl-Schwarzshild-Str 2 D-ellipticity . . . . . . . . . . . . . . . . . . . . . . . . . 7 II.3 Radial distribution of the shells . . . . . . . . . . . . . . . . . . . . . . . 9 III . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 IV IV. Spectroscopy of the shells 15 IV.1 Nature of the stellar population

Boyer, Edmond

432

Muon Collaboration Status 124 Scientists & Engineers from 33 Institutions  

E-Print Network (OSTI)

Muon Collaboration Status 124 Scientists & Engineers from 33 Institutions Co-spokespeople: Steve Meeting, 18 Nov. 2002 #12;Muon Collaboration 124 Scientists & Engineers from 33 Institutions 6 US Labs ANL Univ. Pohang Univ. RAL Tel Aviv Univ. Muon Collaboration #12;Steve Geer HEPAP 18 November 2002 3 Muon

433

Russia says no: Power, status, and emotions in foreign policy  

Science Journals Connector (OSTI)

Abstract Since 2003, Russian foreign behavior has become much more assertive and volatile toward the West, often rejecting U.S. diplomatic initiatives and overreacting to perceived slights. This essay explains Russia's new assertiveness using social psychological hypotheses on the relationship between power, status, and emotions. Denial of respect to a state is humiliating. When a state loses status, the emotions experienced depend on the perceived cause of this loss. When a state perceives that others are responsible for its loss, it shows anger. The belief that others have unjustly used their power to deny the state its appropriate position arouses vengefulness. If a state believes that its loss of status is due to its own failure to live up to expectations, the elites will express shame. Since the end of the Cold War, Russia has displayed anger at the U.S. unwillingness to grant it the status to which it believes it is entitled, especially during the 2008 Russo-Georgian War, and most recently Russia's takeover of Crimea and the 2014 Ukrainian Crisis. We can also see elements of vengefulness in Russia's reaction to recognition of Kosovo, U.S. missile defense plans, the Magnitsky act, and the Snowden affair.

Deborah Welch Larson; Alexei Shevchenko

2014-01-01T23:59:59.000Z

434

cell trait? Know your sickle cell trait status.  

E-Print Network (OSTI)

What is sickle cell trait? Know your sickle cell trait status. Engage in a slow and gradual experiencing unusual physical distress. People at high risk for having sickle cell trait are those whose countries. sickle cell trait is not a disease. Sickle cell trait is the inheritance of one gene for sickle

Devoto, Stephen H.

435

AUTONOMOUS UNDERSEA SYSTEMS NETWORK (AUSNET) Development Status Update  

E-Print Network (OSTI)

1 AUTONOMOUS UNDERSEA SYSTEMS NETWORK (AUSNET) Development Status Update Charles Benton and James Kenney Technology Systems, Inc. (TSI), Wiscassett, ME Steven G. Chappell and D.R. Blidberg Autonomous promises to significantly enhance the capabilities of Autonomous Undersea Vehicles (AUVs) as they become

436

ORIGINAL PAPER Effects of nutritional status on metabolic rate, exercise  

E-Print Network (OSTI)

-Verlag 2009 Abstract The influence of feeding on swimming perfor- mance and exercise recovery in fish is poorly understood. Examining swimming behavior and physiological status following periods of feeding for swimming performance and physiological recovery. Rest- ing metabolic rates were also determined. Fasted

Suski, Cory David

437

Power Systems Development Facility: Design, Construction, and Commissioning Status  

SciTech Connect

This paper will provide an introduction to the Power Systems Development Facility, a Department of Energy sponsored, engineering scale demonstration of two advanced coal-fired power technologies; and discuss current status of design, construction and commissioning of this facility. 28 viewgraphs, including 2 figs.

Powell, C.A.; Vimalchand; Hendrix, H.L.; Honeycut, P.M.

1996-12-31T23:59:59.000Z

438

SYMPOSIUM ON: THE SECOND LAW OF THERMODYNAMICS: STATUS AND CHALLENGES  

E-Print Network (OSTI)

1 SYMPOSIUM ON: THE SECOND LAW OF THERMODYNAMICS: STATUS AND CHALLENGES THE 92ND ANNUAL MEETING efforts at clarification, including this one. The Laws of Thermodynamics have much wider, including, Second Law of Thermodynamics. PACS: 05.90.+m #12;2 INTRODUCTION AND BACKGROUND: Reasoning Open Issues

Kostic, Milivoje M.

439

Status of the National Ignition Campaign Prof. R. Paul Drake  

E-Print Network (OSTI)

Ignition Campaign has the goal of producing net en- ergy gain in a laser-fusion system. I have been keeping Status of the National Ignition Campaign Prof. R. Paul Drake Joint Seminar with Atmospheric progress on the National Ignition Campaign, from a recent conference. This includes a discussion

Shyy, Wei

440

Status of Experiments on National Ignition Facility Presented to  

E-Print Network (OSTI)

into the hohlraum temperature range for ignition experiments at 280-300 eV · The laser, diagnostic, targetStatus of Experiments on National Ignition Facility Presented to 31st Annual Meeting and Symposium Associates 4NIF­1110-20542.ppt #12;National Ignition Campaign goals Moses - 31st Annual Meeting and Symposium

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Status of Rare Kaon Decay Experiments at BNL  

E-Print Network (OSTI)

Status of Rare Kaon Decay Experiments at BNL Toshio Numao TRIUMF June 9, at CAP2003 K #12;s d z;#12;#12;Improvements RS chamber Z resolution Energy resolution 2002 1998 #12;#12;L0- Previous search: 5.9 ? 10-7 KOPIO is waiting for us. #12;

442

Weak interactions of quarks and leptons: experimental status  

SciTech Connect

The present experimental status of weak interactions is discussed with emphasis on the problems and questions and on the possible lines of future investigations. Major topics include; (1) the quark mixing matrix, (2) CP violation, (3) rare decays, (4) the lepton sector, and (5) right handed currents. 118 references. (WHK)

Wojcicki, S.

1984-09-01T23:59:59.000Z

443

NVN-077482 | Open Energy Information  

Open Energy Info (EERE)

2 2 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home BLM Geothermal Case: NVN-077482 Case Data Survey Type Aliquot Part (40 Acres) Case Status Authorized Case Type GEO_LSE_NONCOMP_PRE_2005 Total Acreage 1510 Bid Price/Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 WILMINGTON TRUST CO TRUSTEE Lessee 2 none provided Effective Date 8/1/2005 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action EFFECTIVE DATE Most Recent Action Date 8/1/2005 Location Information Geothermal Resource Area Meridian 21 State(s) Nevada Township 0260N Range 0400E Section 3 Aliquot s2n2,s2 Retrieved from "http://en.openei.org/w/index.php?title=NVN-077482&oldid=666890" Category: BLM Geothermal Case What links here

444

UTU-086756 | Open Energy Information  

Open Energy Info (EERE)

UTU-086756 UTU-086756 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home BLM Geothermal Case: UTU-086756 Case Data Survey Type Aliquot Part (40 Acres) Case Status Authorized Case Type GEO_LSE_COMP_POST_2005 Total Acreage 5120 Bid Price/Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 ORNI 48 LLC Lessee 2 none provided Effective Date 1/31/2019 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action EXPIRES Most Recent Action Date 1/31/2019 Location Information Geothermal Resource Area Meridian 26 State(s) Utah Township 0140S Range 0120W Section 22 Aliquot all Retrieved from "http://en.openei.org/w/index.php?title=UTU-086756&oldid=667910" Category: BLM Geothermal Case What links here Related changes

445

NVN-077247 | Open Energy Information  

Open Energy Info (EERE)

7 7 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home BLM Geothermal Case: NVN-077247 Case Data Survey Type Aliquot Part (40 Acres) Case Status Authorized Case Type GEO_LEASE_NONCOMPETITI Total Acreage 1020 Bid Price/Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 REESE RIVER GEO POWER LLC Lessee 2 none provided Effective Date 10/31/2013 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action EXPIRES Most Recent Action Date 10/31/2013 Location Information Geothermal Resource Area Meridian 21 State(s) Nevada Township 0240N Range 0430E Section 34 Aliquot nene,swse Retrieved from "http://en.openei.org/w/index.php?title=NVN-077247&oldid=663706" Category: BLM Geothermal Case What links here

446

IDI-035812 | Open Energy Information  

Open Energy Info (EERE)

IDI-035812 IDI-035812 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home BLM Geothermal Case: IDI-035812 Case Data Survey Type Aliquot Part (40 Acres) Case Status Authorized Case Type GEO_LSE_COMP_POST_2005 Total Acreage 1739.4 Bid Price/Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 AGUA CALIENTE LLC C-O AMG N Lessee 2 none provided Effective Date 8/1/2007 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action EFFECTIVE DATE Most Recent Action Date 8/1/2007 Location Information Geothermal Resource Area Meridian 8 State(s) Idaho Township 0110N Range 0030W Section 6 Aliquot s2ne,senw,e2sw,se Retrieved from "http://en.openei.org/w/index.php?title=IDI-035812&oldid=663882" Category: BLM Geothermal Case

447

E-Print Network 3.0 - area annual status Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Sample search results for: area annual status Page: << < 1 2 3 4 5 > >> 1 7th Annual Colorado Rare Plant Symposium Conservation Efforts and Status Review of G1 Plants of Colorado...

448

E-Print Network 3.0 - age employment status Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

in O-1 status is authorized only to work for the employer who... years of age) of aliens in O-1 Status are eligible ... Source: Chinnam, Ratna Babu - Department of Industrial...

449

Fuel Cell Buses in U.S. Transit Fleets: Current Status 2012 ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Buses in U.S. Transit Fleets: Current Status 2012 Fuel Cell Buses in U.S. Transit Fleets: Current Status 2012 This report is the sixth in an annual series of reports that summarize...

450

Amerind Ancestry, Socioeconomic Status and the Genetics of Type 2 Diabetes in a Colombian Population  

E-Print Network (OSTI)

Amerind Ancestry, Socioeconomic Status and the Genetics of Type 2 Diabetes in a Colombian) Amerind Ancestry, Socioeconomic Status and the Genetics of Type 2 Diabetes in a Colombian Population. PLo

Reich, David

451

Impact of Temperature on the Physiological Status of a Potential Bioremediation Inoculant, Arthrobacter chlorophenolicus A6  

Science Journals Connector (OSTI)

...bioluminescence) on cellular energy reserves, luciferase activity...estimate the bulk metabolic status of cells introduced into...independently of the cells energy status. This allows for tracking...techniques would enable us to better understand how...

Agneta Backman; Ninwe Maraha; Janet K. Jansson

2004-05-01T23:59:59.000Z

452

Mimicry of a Cellular Low Energy Status Blocks Tumor Cell Anabolism and Suppresses the Malignant Phenotype  

Science Journals Connector (OSTI)

...regulated by the energy status of the cell, which is...indicator of the cellular energy status (4). Changes in cellular...thus shutting down this energy consuming pathway. Similarly...21-25) has prompted us to explore the feasibility...

Johannes V. Swinnen; Annelies Beckers; Koen Brusselmans; Sophie Organe; Joanna Segers; Leen Timmermans; Frank Vanderhoydonc; Ludo Deboel; Rita Derua; Etienne Waelkens; Ellen De Schrijver; Tine Van de Sande; Agns Nol; Fabienne Foufelle; and Guido Verhoeven

2005-03-15T23:59:59.000Z

453

Renewable Diesel Fuels: Status of Technology and R&D Needs |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Diesel Fuels: Status of Technology and R&D Needs Renewable Diesel Fuels: Status of Technology and R&D Needs 2002 DEER Conference Presentation: National Renewable Energy...

454

Nuclear car wash status report, August 2005  

SciTech Connect

A large majority of US imports arrive at seaports in maritime cargo containers. The number of containers arriving is nearly 10 million per year, each with a cargo of up to 30 tons of various materials. This provides a vulnerable entry point for the importation of a nuclear weapon or its components by a terrorist group. Passive radiation sensors are being deployed at portals to detect radioactive material and portable instruments are carried by port personnel to augment detection. Those instruments can detect the neutrons and g-rays produced by {sup 240}Pu that is normally present in weapons grade plutonium in cases where cargo overburden is not too great. However, {sup 235}U produces almost no neutron output in its normal radioactive decay and its principal {gamma}-radiation is at 186 keV and is readily attenuated by small amounts of wood or packing materials. Impurities such as {sup 232}U, often present in reactor irradiated material at the 100-200 ppt level, can provide a detectable signal through significant cargo overburden but the wide variations among samples of HEU make this an unreliable means of detecting SNM. High quality radiography may be useful in determining that the majority of containers are clearly free of SNM. However, some containers will lead to ambiguous results from radiography and passive radiation sensing. For these reasons active neutron interrogation is proposed as a means to produce fission and thus greatly amplify the radiation output of fissionable material to facilitate its reliable detection even when well shielded by large cargo overburden. Historically, the fission signature utilized as the unique identifying feature of fissionable materials is the detection of delayed neutrons. However, these neutrons have very low yield {approx} 0.017 per fission in {sup 235}U, and their low energy results in very poor penetration of hydrogenous materials such as fuels, water, wood, or agricultural products. That signature alone does not provide reliable detection in thick cargos. A new signature has been identified and has been developed within the current project for the detection of well shielded SNM. This SNM signature is based on high-energy {beta}-delayed {gamma}-radiation produced by fission products following neutron or photon induced fission. These {gamma}-rays are high enough in energy (E{sub {gamma}} > 3 MeV) to be readily distinguished from any natural background radioactivity since the latter does not extend above 2.6 MeV. Their abundance is nearly a decade greater than delayed neutrons and their short half-lives deliver nearly all of the signature radiation on time scales of one minute or less and thus facilitate rapid scanning. Finally, for this {gamma}-radiation in the 3-6 MeV range attenuation occurs only by Compton scattering and is in the range where minimum attenuation occurs in all materials. Even the thickest cargos of any material attenuate these {gamma}-rays by only a factor of 10-30X so that the signature is readily detected even with the most challenging shield materials. The goals of the current program are to detect significant quantities (much less than IAEA ''significant'' amounts) of well-shielded SNM, and to do so with detection probability P{sub d} {ge} 95% and with false alarm rates P{sub fp} {le} 0.001. It is the goal to meet these requirements in a scan that requires less than one minute to complete and does so without damage to the cargo or to people who may be hidden inside. We intend to meet these requirements even when the cargo overburden is up to {rho}L {le} 150 g/cm{sup 2} of any material ranging from fuels and agricultural products to steel and lead.

Prussin, S; Slaughter, D; Pruet, J; Descalle, M; Bernstein, A; Hall, J; Accatino, M; Alford, O; Asztalos, S; Church, J; Loshak, A; Madden, N; Manatt, D; Moore, T; Norman, E; Petersen, D

2005-07-29T23:59:59.000Z

455

Accelerated Status Exceptionally promising current UCI undergraduate Engineering students may petition for streamlined admission directly  

E-Print Network (OSTI)

Accelerated Status Exceptionally promising current UCI undergraduate Engineering students may numbered 200-289. How to Petition: Students are required to submit an Accelerated Status Petition Form) to the Graduate Student Affairs Office (5400 Engineering Hall). Students may join the Accelerated Status at any

Mease, Kenneth D.

456

Accelerated Status Exceptionally promising current UCI undergraduate Engineering students may petition for streamlined admission directly  

E-Print Network (OSTI)

Accelerated Status Exceptionally promising current UCI undergraduate Engineering students may numbered 200-289. How to Petition: Students are required to submit an Accelerated Status Petition Form) to the Graduate Student Affairs Office (305 Rockwell Engineering Center). Students may join the Accelerated Status

Mease, Kenneth D.

457

Sea Turtle Assessment Status and Research Needs National Marine Fisheries Service  

E-Print Network (OSTI)

Sea Turtle Assessment Status and Research Needs National Marine Fisheries Service U.S. Department Memorandum NMFS-F/SPO-131 July 2013 #12;#12;Sea Turtle Assessment Status and Research Needs National Marine for Fisheries #12;ii Recommended citation: National Marine Fisheries Service. 2013. Sea Turtle Assessment Status

458

Parasitic infection and oxidative status are associated and vary with breeding activity in the Seychelles warbler  

Science Journals Connector (OSTI)

...assist). Social status may be important...they may invest more energy into reproduction...measured could help us to interpret links...activation and oxidative status (see [34...differ in oxidative status in selected lines...body composition and energy expenditure in nature...

2012-01-01T23:59:59.000Z

459

Science DMZ Case Studies  

NLE Websites -- All DOE Office Websites (Extended Search)

Studies Studies About ESnet Overview ESnet Staff Governance Our Network Case Studies OSCARS Case Studies Science DMZ Case Studies Science DMZ CU Science DMZ Penn State & VTTI Science DMZ NOAA Science DMZ NERSC Science DMZ ALS Multi-facility Workflow LCLS ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Careers Contact Us Technical Assistance: 1 800-33-ESnet (Inside the US) 1 800-333-7638 (Inside the US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Science DMZ Case Studies Developed by ESnet engineers, the Science DMZ model addresses common network performance problems encountered at any institution by creating an environment that is tailored to the needs of high performance science

460

Case No. VBU-0016  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 16 September 15, 1999 DECISION AND ORDER OF THE DEPARTMENT OF ENERGY Appeal Name of Petitioner:Gary Roybal Date of Filing:June 23, 1999 Case Number:VBU-0016 On October 6, 1998, Gary Roybal (Roybal) filed a complaint under the Department of Energy (DOE) Contractor Employee Protection Program, codified at 10 C.F.R. Part 708. The regulations governing the program were revised in a new interim final rule that took effect on April 14, 1999. Along with other procedural changes, the interim final rule reassigned the investigative function to the Office of Hearings and Appeals. All of the pending whistleblower cases in the investigative stage, including Roybal's case, were then transferred to OHA. The OHA investigator assigned to the case dismissed Roybal's complaint on June 11, 1999. On June 23,

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Before a Rate Case  

NLE Websites -- All DOE Office Websites (Extended Search)

is made up of two processes. The first part of the IBR is the Integrated Program Review (IPR), which will address proposed program costs prior to their inclusion in a rate case,...

462

Case Study Performance Data  

Science Journals Connector (OSTI)

This handbook includes fourteen case studies, as selected to illustrate a range of BIPV approaches. They also provide a set of real data on working systems from around the world with full installation details....

2009-01-01T23:59:59.000Z

463

Portfolio Safeguard Case Studies  

Science Journals Connector (OSTI)

This case study designs a portfolio of credit default swaps (CDS) and credit indices to hedge against changes in a collateralized debt obligation (CDO) book. The hedging problem is to minimize risk of portfolio l...

Michael Zabarankin; Stan Uryasev

2014-01-01T23:59:59.000Z

464

Overview of energy-conserving development planning and design techniques based on five case studies  

SciTech Connect

Findings and recommendations are presented of a review of five case studies of ways to conserve energy through development planning and site design in communities. Two approaches were used. In the first approach, a conventional, pre-existing plan was analyzed to determine potential energy use. Once energy-conservation options were identified and evaluated, the conventional plan was modified by employing those options. This approach was used in The Woodlands, Burke Center, and Radisson studies. In the second approach, energy-conservation options are independently identified and evaluated. Those options that passed specific criteria screening were then utilized in developing one or more totally new plans based on energy objectives. This approach was used in Greenbrier and Shenandoah. Radisson is a new town on the outskirts of Syracuse, New York. Greenbrier is a 3000 acre planned community adjacent to Norfolk and Virginia Beach. Shenandoah is a proposed new town in the Atlanta urbanized area. The Woodlands is a new community under development north of Houston. Burke Center is a residential planned unit development in Fairfax County, Virgnia. (MCW)

Not Available

1980-06-01T23:59:59.000Z

465

September 2012, Work Force Retention Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Force Retention Work Group Status Overview Work Force Retention Work Group Status Overview 2 Subgroups: Pro-Force and Non-Pro-Force Pro-Force Subgroup: Accomplishments: 1. Completion of 10 CFR 1046 [Protective Force Personnel Medical, Physical Readiness, Training, and Access Authorization Standards] as a final rule that includes modification efforts to address barriers to workforce retention. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group approved by GC-63 and GC NNSA. Near Term Goals and Activities: 1. Publish 1046 as a final rule - publication anticipated this month.

466

June 2013, FTCP Senior Technical Safety Manager (STSM) Status Report  

NLE Websites -- All DOE Office Websites (Extended Search)

FEDERAL TECHNICAL CAPABILITY PANEL FEDERAL TECHNICAL CAPABILITY PANEL SENIOR TECHNICAL SAFETY MANAGER STATUS REPORT U.S. Department of Energy Washington, D.C. 20585 June 2013 FEDERAL TECHNICAL CAPABILITY PANEL List of Senior Technical Safety Manager (STSM) Positions ORGANIZATION: Office of Environmental Management - Carlsbad Field Office 2 Position Title Incumbent Base Requirements Compensatory Measures Qualification Status Comments Technical Degree Experience Manager Carlsbad Field Office Jose R. Franco Yes Yes No Complete Deputy Manager, Carlsbad Field Office Vacant Director for the Office of Site Operations Donald "Casey" Gadbury Yes Yes No Complete Director for the Office of Environment, Safety and Health/CBFO FTCP Agent George T. Basabilvazo Yes Yes No Complete 3 FEDERAL TECHNICAL CAPABILITY PANEL

467

July 2012, 10 CFR 851 Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 CFR 851 Work Group Status Overview 10 CFR 851 Work Group Status Overview Accomplishments: 1. March 2012. 10 CFR 851 Workshop was held in conjunction with the 2012 Chemical Management Workshop. 2. Communication tools to enhance 10 CFR 851 Worker Safety and Health Program (WSHP) compliance updated: Requirements checklist distributed across DOE complex and on the 10 CFR 851 website; DOE Guide 440.1-1B to include technical clarifications. Near Term Goals/Activities: 1. Samples of acceptable WSHP programs (including ones based on ISM) will be posted on the 851 web site. 2. Teaming of HS-10, NTC, NIEHS, HAMMER to: Develop and/or identify applicable training materials and methods for the recent promulgated Hazard Communication standard, DOE wide approach for this training, and approach for

468

The GEO-SEQ Project: First-Year Status Report  

NLE Websites -- All DOE Office Websites (Extended Search)

GEO-SEQ PROJECT: FIRST-YEAR STATUS REPORT GEO-SEQ PROJECT: FIRST-YEAR STATUS REPORT Sally M. Benson and Larry Myer Earth Sciences Division Ernest Orlando Lawrence Berkeley National Laboratory Berkeley, California 94720 smbenson@lbl.gov ABSTRACT The GEO-SEQ Project is a public-private applied R&D partnership, formed with the goal of developing the technology and information needed to enable safe and cost-effective geologic sequestration by the year 2015. The effort, supported by the U.S. Department of Energy s (DOE s) National Energy Technology Laboratory, involves Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory, Oak Ridge National Laboratory, Stanford University, the U.S. Geological Survey, the Texas Bureau of Economic Geology, the Alberta Research Council, and five private-sector partners

469

W-band ARM Cloud Radar (WACR) Update and Status  

NLE Websites -- All DOE Office Websites (Extended Search)

W-band ARM Cloud Radar (WACR) Update and Status W-band ARM Cloud Radar (WACR) Update and Status PopStefanija, Ivan ProSensing, Inc. Mead, James ProSensing Inc. Widener, Kevin Pacific Northwest National Laboratory Category: Instruments Two W-band ARM Cloud Radars (WACR) have been developed for the SGP and the ARM Mobile Facility (AMF) by ProSensing. The SGP WACR was successfully deployed in the same shelter as the MMCR in 2005. It is currently collecting co-polarization and cross-polarization spectral moments (reflectivity, Doppler velocity, and spectral width) along with spectra data. The AMF WACR will be deployed with the AMF in Niamey, Niger early in 2006. We will present ingested WACR data formats available from the ARM Archive, a selected comparisons of WACR and MMCR data at SGP, and data from

470

June 2013, FTCP Senior Technical Safety Manager (STSM) Status Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL TECHNICAL CAPABILITY PANEL FEDERAL TECHNICAL CAPABILITY PANEL SENIOR TECHNICAL SAFETY MANAGER STATUS REPORT U.S. Department of Energy Washington, D.C. 20585 June 2013 FEDERAL TECHNICAL CAPABILITY PANEL List of Senior Technical Safety Manager (STSM) Positions ORGANIZATION: Office of Environmental Management - Carlsbad Field Office 2 Position Title Incumbent Base Requirements Compensatory Measures Qualification Status Comments Technical Degree Experience Manager Carlsbad Field Office Jose R. Franco Yes Yes No Complete Deputy Manager, Carlsbad Field Office Vacant Director for the Office of Site Operations Donald "Casey" Gadbury Yes Yes No Complete Director for the Office of Environment, Safety and Health/CBFO FTCP Agent George T. Basabilvazo Yes Yes No Complete 3 FEDERAL TECHNICAL CAPABILITY PANEL

471

The Status and Future of AERIs in ARM  

NLE Websites -- All DOE Office Websites (Extended Search)

Status and Future of AERIs Status and Future of AERIs in ARM Dave Turner Space Science and Engineering Center University of Wisconsin - Madison Longwave/Microwave Focus Group 11 March 2008 ARM STM, Norfolk, VA Background * Spectrally resolved IR radiances were considered key component of ARM's observational strategy * Stringent requirements placed on absolute radiometric accuracy (1% ambient radiance), spectral accuracy, noise level, and operability * Instrument development was successful! * ARM has 8 AERI systems: * 11 Million calibrated sky spectra have been collected by ARM AERIs (up to Dec 2007) * SGP-01 * SGP-E14 * AMF-M1 * NSA-C1 (ER) * TWP-C2 * TWP-C3 * Spare (NR) * Spare (ER) AERI Interferometer Assembly AERI Interferometer Assembly Bomem Interferometer ABB HBB Optics Optics Bench Bench Shock

472

July 2012, Work Force Retention Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Force Retention Work Group Status Overview Work Force Retention Work Group Status Overview Accomplishments: 1. Progress on the completion of the 10 CFR 1046 modifications to address barriers to workforce retention. Written response to public comment is being drafted by HS-51. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group approved by GC-63 and GC NNSA. Near Term Goals and Activities: 1. Publish 1046 as a final rule - anticipated completion no later than September, assuming timely OMB review and approval. 2. Draft PF Working Group charter final review by senior management to be

473

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statements and Environmental Assessments Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart This chart represents anticipated activity and is not a commitment for documentation or dates. October 21, 2011 EIS-0426: Notice of Extension of Public Comment Period for the Draft Site-Wide Environmental Impact Statement Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada September 26, 2011 EA-1792: Finding of No Significant Impact University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine September 26, 2011 EA-1792: Final Environmental Assessment University of Maine's DeepWater Offshore Floating Wind Turbine Testing and

474

The ARM Atmospheric Emitted Radiance Interferometer (AERI): Status and  

NLE Websites -- All DOE Office Websites (Extended Search)

The ARM Atmospheric Emitted Radiance Interferometer (AERI): Status and The ARM Atmospheric Emitted Radiance Interferometer (AERI): Status and Preliminary Assessments of Instrument Deployments in 2006 Dedecker, Ralph University of Wisconsin Demirgian, Jack Argonne National Laboratory Knuteson, Robert University Of Wisconsin Revercomb, Henry University of Wisconsin-Madison Tobin, David University of Wisconsin-Madison Turner, David University of Wisconsin-Madison Category: Instruments One of the key operational instruments at the Atmospheric Radiation Measurement Climate Research Facility (ACRF) is the Atmospheric Emitted Radiance Interferometer (AERI). This instrument provides the ARM program with surface-based observations of infrared spectrally resolved radiance from a vertically directed cone with better than 1% accuracy. The data from

475

September 2012, 10 CFR 851 Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 CFR 851 Work Group Status Overview 10 CFR 851 Work Group Status Overview Accomplishments: 1. March 2012. 10 CFR 851 Workshop was held in conjunction with the 2012 Chemical Management Workshop. 2. Communication tools to enhance 10 CFR 851 Worker Safety and Health Program (WSHP) compliance updated: Requirements checklist distributed across DOE complex and on the 10 CFR 851 website; DOE Guide 440.1-1B to include technical clarifications. 3. Aug 7. A WG teleconference to reconfirm the actions described in the charter and to discuss the need to identify areas for the Work Groups next efforts. Near Term Goals/Activities: 1. Samples of acceptable WSHP programs (including ones based on ISM) will be posted on the 851 web site. 2. Teaming of HS-10, NTC, NIEHS, HAMMER to: Develop and/or identify

476

An Alfirmotive Action/Equal Opportunity Employer STATUS AND PLANS  

Office of Legacy Management (LM)

I&s ' c I&s ' c c scilenti ? alamos c laboratoiy of ihe University of California Lsr i'"""', i'" MEXICO 8,545 An Alfirmotive Action/Equal Opportunity Employer STATUS AND PLANS REPORT FOR FORMER TECHNICAL AREA ONE AT LOS ALAMOS SCIENTIFIC LABORATORY HEALTH RESEARCH DIVISION JANUARY i976 I I I I I I I if n II 9 I I I I. I I I I STATUS AND PLANS REPORT FOR FORMER TECHNICAL AREA ONE AT LOS ALAMOS SCIENTIFIC LABORATORY INTRODUCTION Because of increased official and public concern over low-level radioactive contamination of private lands or former ERDA (AEC) lands released to the public, the undeveloped part of the former main tech- nical area of LASL (TA-1) was surveyed in 1974 at the request of ERDA @EC)*. This effort was to determine whether any of the land (%40

477

Status of Identification of VHE Gamma-Ray Sources  

SciTech Connect

With the recent advances made by Cherenkov telescopes such as H.E.S.S. the field of very high-energy (VHE) {gamma}-ray astronomy has recently entered a new era in which for the first time populations of Galactic sources such as e.g. Pulsar wind nebulae (PWNe) or Supernova remnants (SNRs) can be studied. However, while some of the new sources can be associated by positional coincidence as well as by consistent multi-wavelength data to a known counterpart at other wavelengths, most of the sources remain not finally identified. In the following, the population of Galactic H.E.S.S. sources will be used to demonstrate the status of the identifications, to classify them into categories according to this status and to point out outstanding problems.

Funk, Stefan; /SLAC

2006-09-28T23:59:59.000Z

478

Indian Renewable Energy Status Report: Background Report for DIREC 2010  

NLE Websites -- All DOE Office Websites (Extended Search)

Indian Renewable Energy Status Report Indian Renewable Energy Status Report Background Report for DIREC 2010 D. S. Arora (IRADe) | Sarah Busche (NREL) | Shannon Cowlin (NREL) | Tobias Engelmeier (Bridge to India Pvt. Ltd.) | Hanna Jaritz (IRADe) | Anelia Milbrandt (NREL) | Shannon Wang (REN21 Secretariat) NREL/TP-6A20-48948 October 2010 I R A D e NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately

479

LBNL Building 90 Monitoring: Status Update and New Energy Information  

NLE Websites -- All DOE Office Websites (Extended Search)

LBNL Building 90 Monitoring: Status Update and New Energy Information LBNL Building 90 Monitoring: Status Update and New Energy Information System Features Speaker(s): Girish Ghatikar Jeff Propp Kevin Kircher Richard Diamond Steve Greenberg Tom Owen Date: December 14, 2009 - 1:00pm Location: 90-3122 (Additional speakers from EETD will be: Rick Diamond (lead), Steve Greenberg, Rish Ghatikar, Kevin Kircher & more...) On the LBNL site, Building 90 (B-90) is a 1960's vintage, 90,000 sq. ft., four-story building that is occupied by approximately 450 researchers and other staff (and growing!). In 2009, a team of EETD's Building Technologies Department researchers and facilities staff, with collaboration from subcontractors, initiated the B-90 Monitoring and Energy Information System (EIS) Project to understand the energy use and environmental conditions in B-90 in order

480

Status of the SPIRAL I upgrade at GANIL  

SciTech Connect

The upgrade of the ''Systeme de Production d'Ions Radioactifs en Ligne'' phase I (SPIRAL I) installed at the ''Grand Accelerateur National d'Ions Lourds'' (GANIL) situated at Caen, France, is in progress and should be ready by 2014. In parallel, the first part of SPIRAL II facility is currently under construction. The global status of the upgrade is presented: goal, radioactive ion production systems, modification of the production cave and impact of the current safety re-evaluation of GANIL.

Jardin, P.; Bajeat, O.; Delahaye, P.; Dubois, M.; Feierstein, C.; Pellemoine, F.; Lecomte, P.; Leherissier, P.; Maunoury, L.; Saint-Laurent, M. G.; Traykov, E. [GANIL, Grand Accelerateur National d'Ions Lourds, CEA-DSM/CNRS-IN2P3, Blvd. H. Becquerel, BP 55027 14076 Caen Cedex 5 (France); Couratin, C. [LPC, Laboratoire de Physique Corpusculaire, CNRS-IN2P3/Universite de Caen Basse-Normandie/ENSICaen, Blvd. Marechal Juin, 14050 Caen Cedex (France)

2012-02-15T23:59:59.000Z

Note: This page contains sample records for the topic "acres case status" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

The Green Computing Observatory: status of acquisition and analysis  

E-Print Network (OSTI)

The Green Computing Observatory: status of acquisition and analysis Cécile Germain-Renaud1, Julien, CNRS, INRIA 2: Laboratoire de l'Accélérateur Linéaire, CNRS-IN2P3 #12; Previous GreenDays talks o GreenDays@Paris The Green Computing Observatory: plans and scientific challenges o GreenDays@Lyon The Green Computing

Lefèvre, Laurent

482

Status of hydrogen fuel cell electric buses worldwide  

Science Journals Connector (OSTI)

Abstract This review summarizes the background and recent status of the fuel cell electric bus (FCEB) demonstration projects in North America and Europe. Key performance metrics include accumulated miles, availability, fuel economy, fuel cost, roadcalls, and hydrogen fueling. The state-of-the-art technology used in today's fuel cell bus is highlighted. Existing hydrogen infrastructure for refueling is described. The article also presents the challenges encountered in these projects, the experiences learned, as well as current and future performance targets.

Thanh Hua; Rajesh Ahluwalia; Leslie Eudy; Gregg Singer; Boris Jermer; Nick Asselin-Miller; Silvia Wessel; Timothy Patterson; Jason Marcinkoski

2014-01-01T23:59:59.000Z

483

AD-7/GBAR status report for the 2015 CERN SPSC  

E-Print Network (OSTI)

The GBAR experiment will use one of the low energy antiproton beam lines from the ELENA ring that is being prepared and scheduled to start operating in 2017. The apparatus is broadly divided into four sections: antiproton deceleration and focussing, positron production and accumulation, antihydrogen cooling and preparation, and detection. In the following, we give updates on the different parts and the status of preparation for installation in the AD hall, referring to the previous report that was submitted in April of 2014

Banerjee, D; Brook-Roberge, D; Charlton, M; Clad, P; Comini, P; Crivelli, P; Dalkarov, O; Debu, P; Douillet, A; Dufour, G; Dupr, P; Eriksson, S; Froelich, P; Grandemange, P; Guellati, S; Gurout, R; Heinrich, J-M; Hervieux, P-A; Hilico, L; Husson, A; Indelicato, P; Jonsell, S; Karr, J-P; Khabarova, K; Kolachevsky, N; Kuroda, N; Lambrecht, A; Leite, A M M; Liszkay, L; Lotrus, P; Lunney, D; Madsen, N; Manfredi, G; Mansouli, B; Matsuda, Y; Mohri, A; Mortensen, T; Nagashima, Y; Nesvizhevsky, V; Nez, F; Prez, P; Regenfus, C; Rey, J-M; Reymond, J-M; Rouss, J-Y; Reynaud, S; Rubbia, A; Sacquin, Y; Schmidt-Kaler, F; Sillitoe, N; Staszczak, M; Szabo-Foster, C I; Torii, H; Vallage, B; Valdes, M; van der Werf, D P; Voronin, A; Walz, J; Wolf, S; Wronka, S; Yamazaki, Y

2015-01-01T23:59:59.000Z

484

Status of the ALICE experiment at the LHC  

E-Print Network (OSTI)

The status of the ALICE experiment is presented. ALICE is the LHC experiment devoted to heavy ion collisions. Preparing for the first lead-lead run, foreseen in November 2010, ALICE is successfully collecting data in proton-proton collisions at the LHC since November 2009, exploiting the charateristics of the detector for its proton-proton physics program. First results are briefly reviewed with an emphasis on performance of its detector sub-systems.

Pietro Antonioli; for the ALICE Collaboration

2010-10-18T23:59:59.000Z

485

The international status of intelligence-collecting reconnaissance satellites  

E-Print Network (OSTI)

May 1972 Major Subject: Political Science THE INTERNATIONAL STATUS OF INTELLIGENCE- COLLECTING RECONNAISSANCE SATELLITES A Thesis by BRENT ALLEN GATES Approved as to style and content by: (Chairman of Commit e) 09JD ' J 'd (Head of Department... and legal issues surrounding aerial reconnaissance are examined. It is shown that the rapid technological evolution of spaceborne reconnaissance systems which is taking place in the absence of international agreements governing these systems is a...

Gates, Brent Allen

1972-01-01T23:59:59.000Z

486

2008 Status Report - Savings Estimates for the ENERGY STAR Voluntary  

NLE Websites -- All DOE Office Websites (Extended Search)

Status Report - Savings Estimates for the ENERGY STAR Voluntary Status Report - Savings Estimates for the ENERGY STAR Voluntary Labeling Program Title 2008 Status Report - Savings Estimates for the ENERGY STAR Voluntary Labeling Program Publication Type Journal Article LBNL Report Number LBNL-56380 Year of Publication 2007 Authors Sanchez, Marla C., Carrie A. Webber, Richard E. Brown, and Gregory K. Homan Date Published 11/2007 Publisher Lawrence Berkeley National Laboratory ISBN Number LBNL-56380(2008) Keywords Enduse, Energy End-Use Forecasting, EUF Abstract ENERGY STAR is a voluntary labeling program designed to identify and promote energy-efficient products, buildings and practices. Operated jointly by the Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE), ENERGY STAR includes more than thirty products, spanning office equipment, residential heating and cooling equipment, commercial and residential lighting, home electronics, and major appliances. This report presents savings estimates for ENERGY STAR labeled products. We present estimates of energy, dollar, and carbon savings achieved by the program in the year 2007, what we expect in 2008, and provide savings forecasts for the periods 2008 to 2015 and 2008 to 2025. The forecast represents our best estimate of future ENERGY STAR savings. It is based on realistic ENERGY STAR unit sales for each of the products.

487

Fuel Cell Technology Status Analysis Project: Partnership Opportunities (Fact Sheet)  

SciTech Connect

This fact sheet describes National Renewable Energy Laboratory's (NREL's) Fuel Cell Technology Status Analysis Project. NREL is seeking fuel cell industry partners from the United States and abroad to participate in an objective and credible analysis of commercially available fuel cell products to benchmark the current state of the technology and support industry growth. Participating fuel cell developers share price information about their fuel cell products and/or raw fuel cell test data related to operations, maintenance, and safety with NREL via the Hydrogen Secure Data Center (HSDC). The limited-access, off-network HSDC houses the data and analysis tools to protect proprietary information. NREL shares individualized data analysis results as detailed data products (DDPs) with the partners who supplied the data. Aggregated results are published as composite data products (CDPs), which show the technology status without identifying individual companies. The CDPs are a primary benchmarking tool for the U.S. Department of Energy and other stakeholders interested in tracking the status of fuel cell technologies. They highlight durability advancements, identify areas for continued development, and help set realistic price expectations at small-volume production.

Not Available

2013-06-01T23:59:59.000Z

488

NVN-058196 | Open Energy Information  

Open Energy Info (EERE)

NVN-058196 NVN-058196 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home BLM Geothermal Case: NVN-058196 Case Data Survey Type Aliquot Part (40 Acres) Case Status Authorized Case Type GEO_LEASE_NONCOMPETITI Total Acreage 663.76 Bid Price/Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 NGP BLUE MOUNTAIN I LLC Lessee 2 none provided Effective Date 4/1/1994 Expire Date Held By Production (HBP) HELD BY PROD-Actual HBP Date 8/1/1990 RoyaltyRate 1.75% - 3.5% Most Recent Action ROYALTY RATE -1 Most Recent Action Date 4/1/1994 Location Information Geothermal Resource Area Meridian 21 State(s) Nevada Township 0360N Range 0340E Section 14 Aliquot e2 Retrieved from "http://en.openei.org/w/index.php?title=NVN-058196&oldid=667050"

489

UTU-086775 | Open Energy Information  

Open Energy Info (EERE)

UTU-086775 UTU-086775 Case Data Survey Type Aliquot Part (40 Acres) Case Status Authorized Case Type GEO_LSE_COMP_POST_2005 Total Acreage 4499.48 Bid Price/Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 ORNI 48 LLC Lessee 2 none provided Effective Date 1/12/2009 Expire Date Held By Production (HBP) HBP Date RoyaltyRate 1.75% - 3.5% Most Recent Action ROYALTY RATE -1 Most Recent Action Date 1/12/2009 Location Information Geothermal Resource Area Meridian 26 State(s) Utah Township 0150S Range 0120W Section 5 Aliquot all Retrieved from "http://en.openei.org/w/index.php?title=UTU-086775&oldid=665773" Category: BLM Geothermal Case What links here Related changes Special pages Printable version Permanent link Browse properties

490

NVN-077272 | Open Energy Information  

Open Energy Info (EERE)

272 272 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home BLM Geothermal Case: NVN-077272 Case Data Survey Type Aliquot Part (40 Acres) Case Status Authorized Case Type GEO_LSE_COMP_PRE_2005 Total Acreage 1274 Bid Price/Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 ENEL SALT WELLS LLC Lessee 2 none provided Effective Date 12/1/2003 Expire Date Held By Production (HBP) HELD BY PROD-Actual HBP Date 3/10/2009 RoyaltyRate 10% - 5% - 5% Most Recent Action RLTY RATE -10%- Most Recent Action Date 12/1/2003 Location Information Geothermal Resource Area Meridian 21 State(s) Nevada Township 0170N Range 0300E Section 36 Aliquot se Retrieved from "http://en.openei.org/w/index.php?title=NVN-077272&oldid=664730

491

NVN-017283A | Open Energy Information  

Open Energy Info (EERE)

NVN-017283A NVN-017283A Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home BLM Geothermal Case: NVN-017283A Case Data Survey Type Aliquot Part (40 Acres) Case Status Authorized Case Type GEO_LEASE_COMPETITIVE Total Acreage 640 Bid Price/Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 TGP COYOTE CANYON LLC Lessee 2 none provided Effective Date 11/1/1977 Expire Date Held By Production (HBP) HELD BY LOCATION IN A PRODUCING UNIT HBP Date 6/14/1988 RoyaltyRate Most Recent Action EFFECTIVE DATE Most Recent Action Date 11/1/1977 Location Information Geothermal Resource Area Meridian 21 State(s) Nevada Township 0240N Range 0360E Section 22 Aliquot all Retrieved from "http://en.openei.org/w/index.php?title=NVN-017283A&oldid=668997"

492

NVN-053371 | Open Energy Information  

Open Energy Info (EERE)

1 1 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home BLM Geothermal Case: NVN-053371 Case Data Survey Type Aliquot Part (40 Acres) Case Status Authorized Case Type GEO_LSE_COMP_PRE_2005 Total Acreage 560 Bid Price/Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 SODA LAKE RESRC PRTNRSHP Lessee 2 none provided Effective Date 10/1/1975 Expire Date Held By Production (HBP) HELD BY PROD-ALLOCATED HBP Date 8/1/1990 RoyaltyRate 10% - 5% - 5% Most Recent Action RLTY RATE -10%- Most Recent Action Date 10/1/1975 Location Information Geothermal Resource Area Meridian 21 State(s) Nevada Township 0200N Range 0280E Section 28 Aliquot s2 Retrieved from "http://en.openei.org/w/index.php?title=NVN-053371&oldid=666665"

493

NVN-040353 | Open Energy Information  

Open Energy Info (EERE)

3 3 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home BLM Geothermal Case: NVN-040353 Case Data Survey Type Aliquot Part (40 Acres) Case Status Authorized Case Type GEO_LSE_COMP_PRE_2005 Total Acreage 40 Bid Price/Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 BRADY POWER PARTNERS Lessee 2 none provided Effective Date 4/1/1986 Expire Date Held By Production (HBP) HELD BY PROD-ALLOCATED HBP Date 12/20/1985 RoyaltyRate 10% - 5% - 5% Most Recent Action RLTY RATE -10%- Most Recent Action Date 4/1/1986 Location Information Geothermal Resource Area Meridian 21 State(s) Nevada Township 0230N Range 0260E Section 36 Aliquot sese Retrieved from "http://en.openei.org/w/index.php?title=NVN-040353&oldid=662079

494

Safety Case Depictions vs. Safety Cases Would the Real Safety Case Please Stand Up?  

E-Print Network (OSTI)

Safety Case Depictions vs. Safety Cases ­ Would the Real Safety Case Please Stand Up? Ibrahim Habli York, UK ibrahim.habli@cs.york.ac.uk, tim.kelly@cs.york.ac.uk Keywords: Safety Cases, Safety Arguments, GSN, Safety Assurance, Certification Abstract The integrity of the safety case depends primarily

Kelly, Tim

495

Case No. VBR-0002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VBR-0002 VBR-0002 January 24, 2000 DECISION AND ORDER OF THE DEPARTMENT OF ENERGY Supplemental Order Name of Petitioner: Westinghouse Savannah River Company Date of Filing: November 12, 1999 Case Number: VBR-0002 This supplemental order concerns a Motion for Reconsideration (Case No. VBR-0002) filed by Westinghouse Savannah River Company (WSRC) on November 12, 1999. The reconsideration motion relates to an Initial Agency Decision issued by the Office of Hearings and Appeals (OHA) of the Department of Energy (DOE) on November 2, 1999 (Case No. VBH-0002). In the Initial Agency Decision, I granted relief to the Complainant on the whistleblower complaint he had filed against WSRC under 10 C.F.R. Part 708.(1) I found that WSRC had failed to prove by "clear and convincing" evidence

496

Case No. VWD-0004  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 July 1, 1999 DECISION AND ORDER OF THE DEPARTMENT OF ENERGY Motion for Discovery Supplemental Order Names of Petitioners:Princeton University General Physics Corporation Date of Filing: June 10, 1999 Case Number: VWD-0004 This decision will consider a Motion for Discovery filed jointly by Princeton University (Princeton) and General Physics Corporation (GPC) on June 10, 1999 with the Office of Hearings and Appeals (OHA) of the Department of Energy (DOE). The discovery motion relates to a hearing requested by David Turner under the DOE's Contractor Employee Protection Program, 10 C.F.R. Part 708 (Part 708). The OHA has assigned Mr. Turner's hearing request Case No. VWA-0038, and the discovery request under consideration Case No. VWD-0004. I. Background A. The DOE Contractor Employee Protection Program

497

Case No. VBH-0025  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 June 22, 2000 DEPARTMENT OF ENERGY OFFICE OF HEARINGS AND APPEALS Initial Agency Decision Name of Case: Alizabeth Aramowicz Smith Date of Filing:July 6, 1999 Case Number: VBH-0025 This Initial Agency Decision concerns a whistleblower complaint filed by Alizabeth Aramowicz Smith, a former contractor employee at the Oak Ridge National Laboratory. As explained below, Smith's complaint should be denied. This case arises under the Department of Energy's Contractor Employee Protection Program, 10 C.F.R. Part 708, the "whistleblower" regulations. The whistleblower regulations prohibit a contractor from retaliating against a contractor employee who engages in protected conduct. Protected conduct includes disclosing information that the employee believes reveals 1) a substantial violation of a law, rule, or

498

Case No. VWD-0002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 May 21, 1999 DECISION AND ORDER OF THE DEPARTMENT OF ENERGY Motion for Discovery Supplemental Order Name of Petitioner:Frank E. Isbill Date of Filing: May 4, 1999 Case Number: VWD-0002 This determination will consider two requests for discovery filed with the Office of Hearings and Appeals (OHA) on May 4, 1999, by Frank E. Isbill (the complainant). These requests (which have been grouped together as one Motion for Discovery, Case No. VWD-0002) concern the hearing requested by the complainant under the Department of Energy's Contractor Employee Protection Program, 10 C.F.R. Part 708 (Part 708). He requested this hearing on March 29, 1999 (Case No. VWA-0034) in connection with the Part 708 complaint he filed against NCI Communications, Inc. (the contractor). The DOE recently

499

Case No. VWZ-0017  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 November 10, 1999 DECISION AND ORDER OF THE DEPARTMENT OF ENERGY Motion to Dismiss Name of Petitioner: University of California Date of Filing: October 6, 1999 Case Number: VWZ-0017 This decision considers a Motion to Dismiss filed by the University of California (the University) on October 6, 1999. In its Motion, the University seeks dismissal of the complaint filed against it by Charles Montaño under the Department of Energy's (DOE) Contractor Employee Protection Program, which is codified at 10 C.F.R. Part 708. Montaño's complaint under Part 708 has been assigned Office of Hearings and Appeals (OHA) Case No. VWA-0042. The present Motion has been assigned Case No. VWZ-0017. The Department of Energy established its Contractor Employee Protection Program to safeguard "public

500

Case No. VWZ-0010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 May 12, 1999 DECISION AND ORDER OF THE DEPARTMENT OF ENERGY Motion to Dismiss Name of Petitioner: West Valley Nuclear Services Co., Inc. Date of Filing: April 27, 1999 Case Number: VWZ-0010 This decision considers a "Motion to Dismiss" filed by West Valley Nuclear Services, Inc. (West Valley) on April 27, 1999. In its Motion, West Valley seeks the dismissal of a Complaint filed by John L. Gretencord (Gretencord) under the Department of Energy's (DOE) Contractor Employee Protection Program, which is codified at 10 C.F.R. Part 708. Mr. Gretencord requested a hearing on his Complaint under 10 C.F.R. Part 708 on March 19, 1999, and it has been assigned Office of Hearings and Appeals (OHA) Case No. VWA-0033. The present Motion has been assigned Case No. VWZ-0010.