Review of Supervisory Control and Data Acquisition (SCADA) Systems  

SciTech Connect (OSTI)

A review using open source information was performed to obtain data related to Supervisory Control and Data Acquisition (SCADA) systems used to supervise and control domestic electric power generation, transmission, and distribution. This report provides the technical details for the types of systems used, system disposal, cyber and physical security measures, network connections, and a gap analysis of SCADA security holes.

Reva Nickelson; Briam Johnson; Ken Barnes

2004-01-01T23:59:59.000Z

2

"Supervisory Control and Data Acquisition (SCADA) Systems." The CIP Report.  

Broader source: Energy.gov (indexed) [DOE]

"Supervisory Control and Data Acquisition (SCADA) Systems." The CIP "Supervisory Control and Data Acquisition (SCADA) Systems." The CIP Report. Vol 7 No 8 "Supervisory Control and Data Acquisition (SCADA) Systems." The CIP Report. Vol 7 No 8 Featured in this month's issue of The CIP Report are Supervisory Control and Data Acquisition (SCADA) systems. SCADA systems monitor and control the processes of many of our Nation's infrastructures. The security and safety of transportation, water, communications, and many other vital parts of our everyday lives all rely on SCADA systems. In this issue we look at some of the different SCADA systems and their applications. The CIP Report More Documents & Publications The CIP Report, Vol.11, No. 2 (August 2012): Smart Grid Security Introduction SCADA Security for Managers and Operators

3

Definition: Supervisory Control and Data Acquisition (SCADA) Communications  

Open Energy Info (EERE)

and Data Acquisition (SCADA) Communications and Data Acquisition (SCADA) Communications Network Jump to: navigation, search Dictionary.png Supervisory Control and Data Acquisition (SCADA) Communications Network SCADA communication networks are used to control geographically dispersed devices. The electricity grid has employed them for 15 years; smart grid implements SCADA more extensively both in geographic density and automated control of distribution system functionality. "SCADA systems are highly distributed systems used to control geographically dispersed assets, often scattered over thousands of square kilometers, where centralized data acquisition and control are critical to system operation." NIST Guide to Supervisory and Data Acquisition - SCADA and Industrial Control Systems Security (2007).[1]

4

SP 800-82. Guide to Industrial Control Systems (ICS) Security: Supervisory Control and Data Acquisition (SCADA) systems, Distributed Control Systems (DCS), and other control system configurations such as Programmable Logic Controllers (PLC)  

Science Journals Connector (OSTI)

The purpose of this document is to provide guidance for securing industrial control systems (ICS), including supervisory control and data acquisition (SCADA) systems, distributed control systems (DCS), and other systems performing control functions. ... Keywords: Cyber-physcial systems, ICS, Industrial Control Systems, SCADA, Supervisory Control and Data Acquisition, security controls, threats, vulnerabilities

Keith A. Stouffer; Joseph A. Falco; Karen A. Scarfone

2011-06-01T23:59:59.000Z

5

Optimal Design of Remote Terminal Unit (RTU) for Wireless SCADA System for Energy Management  

Science Journals Connector (OSTI)

For energy deficit countries, the design of Supervisory Control and Data Acquisition (SCADA) based energy management systems for optimal distribution is of high interest. Such design involves development of Remote Terminal Unit (RTU) which is considered ... Keywords: Field Programmable Gate Array (FPGA), Programmable Logic Controller (PLC), Remote Terminal Unit (RTU), Supervisory Control and Data Acquisition (SCADA), Tele-Control Interface (TCI), Wireless Communication

Muhammad Aamir; Javier Poncela; Muhammad Aslam Uqaili; B. S. Chowdhry; Nishat Ahmad Khan

2013-04-01T23:59:59.000Z

6

National SCADA Test Bed - Enhancing control systems security...  

Broader source: Energy.gov (indexed) [DOE]

SCADA Test Bed - Enhancing control systems security in the energy sector (September 2009) National SCADA Test Bed - Enhancing control systems security in the energy sector...

7

Towards Integrated Model-Driven Testing of SCADA Systems Using the Eclipse Modeling Framework and Modelica  

Science Journals Connector (OSTI)

Testing SCADA (Supervisory Control And Data Acquisition) near real-time systems is challenging, as it involves complex interactions and the simulation of the supervised and controlled environment. Model-driven testing techniques can help to achieve clarity ... Keywords: SCADA, Testing, MDT, MDA, EMF, Modelica

Jrn Guy S?; Adrian Pop; Peter Fritzson; Luke Wildman

2008-03-01T23:59:59.000Z

8

National SCADA Test Bed Enhancing control systems security in the energy  

Broader source: Energy.gov (indexed) [DOE]

SCADA Test Bed Enhancing control systems security in the SCADA Test Bed Enhancing control systems security in the energy sector National SCADA Test Bed Enhancing control systems security in the energy sector Improving the security of energy control systems has become a national priority. Since the mid-1990's, security experts have become increasingly concerned about the threat of malicious cyber attacks on the vital supervisory control and data acquisition (SCADA) and distributed control systems (DCS) used to monitor and manage our energy infrastructure. Many of the systems still in use today were designed to operate in closed, proprietary networks. National SCADA Test Bed Enhancing control systems security in the energy sector More Documents & Publications NSTB Summarizes Vulnerable Areas Transmission and Distribution World March 2007: DOE Focuses on Cyber

9

SCADA architecture with mobile remote components  

Science Journals Connector (OSTI)

With the advent of new technologies, the demand of connecting IT systems to the Internet is increasing. This is also the case for Control systems specifically SCADA (Supervisory Control and Data Acquisition) systems. Traditional SCADA systems are connected ... Keywords: SCADA, control systems, mobility, remote components

Tai-Hoon Kim

2010-08-01T23:59:59.000Z

10

Architecture for SCADA with mobile remote components  

Science Journals Connector (OSTI)

With the advent of new technologies, the demand of connecting IT systems to the Internet is increasing. This is also the case for Control systems specifically SCADA (Supervisory Control And Data Acquisition) systems. Traditional SCADA systems are connected ... Keywords: SCADA, control systems, mobility, remote components

Rosslin John Robles; Tai-Hoon Kim

2010-05-01T23:59:59.000Z

11

Smart SCADA system for urban air pollution monitoring  

Science Journals Connector (OSTI)

Abstract There are a number of different types of monitoring stations for checking air quality levels in urban environments. These monitoring stations usually just perform data acquisition of the measured values from the sensors and store them in the database. The processing of the measured results as well as the statistical analysis is mainly done in other places where the data come from various communication systems. Acquisition of the measured data is commonly done on-line while the processing and statistical analysis is performed off-line. As opposed to these measurement systems, this implemented device enables the acquisition and statistical processing of the measured data in real time and the results are instantly available to all users. The system indicates the air pollutants using the ARMA model. The transmission of information in the realized smart SCADA system is done by the Modbus protocol using shared variables which gives the whole system a stronger hierarchical structure.

Josif Tomi?; Miodrag Kuljevi?; Milan Vidakovi?; Vladimir Rajs

2014-01-01T23:59:59.000Z

12

Demonstration of SCADA system to Manage Oilfield Pump Off Controllers  

SciTech Connect (OSTI)

PC-based SCADA systems are today widely accepted by the oil and gas industry, thanks to the increased power and capabilities of PCs, their reduced costs, and the wider use of PCs by energy companies in office and field operations. More and more field operators are using laptops in their daily work duties. This has made the PC the choice for field SCADA systems, and for making SCADA data available throughout company operations. As PCs have become more powerful, it has allowed SCADA software developers to add more capabilities to their systems. SCADA systems have become tools that now help field operators perform their jobs more efficiently, facilitate in optimizing producing wells, provide an active interface for monitoring and controlling plants and compressors, and provide real-time and historical well data to engineers to help them develop strategies for optimizing field operations.

Newquist, Dan

2000-09-11T23:59:59.000Z

13

Framework for SCADA Security Policy  

Broader source: Energy.gov (indexed) [DOE]

Framework for SCADA Security Policy Framework for SCADA Security Policy Dominique Kilman Jason Stamp dkilman@sandia.gov jestamp@sandia.gov Sandia National Laboratories Albuquerque, NM 87185-0785 Abstract - Modern automation systems used in infrastruc- ture (including Supervisory Control and Data Acquisition, or SCADA) have myriad security vulnerabilities. Many of these relate directly to inadequate security administration, which precludes truly effective and sustainable security. Adequate security management mandates a clear administrative struc- ture and enforcement hierarchy. The security policy is the root document, with sections covering purpose, scope, posi- tions, responsibilities, references, revision history, enforce- ment, and exceptions for various subjects relevant for system

14

ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security  

Broader source: Energy.gov (indexed) [DOE]

and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security Assessment at National SCADA Test Bed ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security Assessment at National SCADA Test Bed Twelve utilities have formed a consortium with ABB, a supervisory control and data acquisition (SCADA) system vendor, to privately fund advanced research and testing through the U.S. Department of Energy's (DOE) National SCADA Test Bed (NSTB), announced a recent article in the journal Transmission & Distribution World. ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security Assessment at National SCADA Test Bed More Documents & Publications Security is Not an Option ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004)

15

Hallmark Project Commercialization of the Secure SCADA Communications  

Broader source: Energy.gov (indexed) [DOE]

Project Commercialization of the Secure SCADA Project Commercialization of the Secure SCADA Communications Protocol, a cryptographic security solution for device-to-device communication Hallmark Project Commercialization of the Secure SCADA Communications Protocol, a cryptographic security solution for device-to-device communication Increased connectivity and automation in the control systems that manage the nation's energy infrastructure have improved system functionality, but left systems more vulnerable to cyber attack. Intruders could severely disrupt control system operation by sending fabricated information or commands to control system devices. To ensure message integrity, supervisory control and data acquisition (SCADA) systems require a method to validate device-to-device communication and verify that information has

16

ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) |  

Broader source: Energy.gov (indexed) [DOE]

SCADA/EMS System INEEL Baseline Summary Test Report (November SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) This document covers the security evaluation of the "baseline" or "as delivered" system performed in the Idaho National Engineering and Environmental Laboratory (INEEL) SCADA test bed as part of the Critical Infrastructure Test Range Development Program, which is funded by the U.S. Department of Energy; Office of Energy Assurance (DOE/OEA). This report is a nonproprietary version of the report sent to ABB that identified specific issues related to the security vulnerabilities in the ABB SCADA/EMS system. Work was performed by specialists in the fields of control system development, networking, software engineering, and cybersecurity. This

17

Good Practice Guide on Firewall Deployment for SCADA and Process Control  

Broader source: Energy.gov (indexed) [DOE]

Good Practice Guide on Firewall Deployment for SCADA and Process Good Practice Guide on Firewall Deployment for SCADA and Process Control Networks Good Practice Guide on Firewall Deployment for SCADA and Process Control Networks In recent years, Supervisory Controls and Data Acquisition (SCADA), process control and industrial manufacturing systems have increasingly relied on commercial information technologies for both critical and non-critical communications. While beneficial in other areas, use of these common protocols and operating systems has resulted in significantly less isolation from the outside world for vital SCADA and Process Control Networks (PCNs). These systems are now under risk of attack from a variety of threats. One commonly suggested security solution is to isolate the SCADA and PCN systems from the Internet and corporate enterprise network (EN) through the

18

Microsoft Word - Utilities Form Consortium to Fund SCADA Testing_v3.doc  

Broader source: Energy.gov (indexed) [DOE]

ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security Assessment at National SCADA Test Bed Twelve utilities have formed a consortium with ABB, a supervisory control and data acquisition (SCADA) system vendor, to privately fund advanced research and testing through the U.S. Department of Energy's (DOE) National SCADA Test Bed (NSTB), announced a recent article in the journal Transmission & Distribution World. The utilities, located in the United States and Australia, will fund SCADA system assessments at NSTB testing facilities at Idaho National Laboratory. The consortium began taking shape last fall at an ABB User Group meeting, where ABB and some of its energy management system (EMS) customers asked other ABB system users to join in on

19

Evaluating Equipment Performance Using SCADA/PMS Data for Thermal Utility Plants - Case Studies  

E-Print Network [OSTI]

Acquisition Plant Monitoring Systems (SCADA/PMS) or Energy Management and Control Systems (EMCS) to monitor sensors, display data, control equipment, activate alarms and log information. However, the utilization and interpretation of the logged data are often...

Deng, X.; Chen, Q.; Xu, C.

2007-01-01T23:59:59.000Z

20

Discrete Event Simulation of QoS of a SCADA System Interconnecting a Power Grid and a Telco Network  

E-Print Network [OSTI]

Discrete Event Simulation of QoS of a SCADA System Interconnecting a Power Grid and a Telco Network, Telco network and Power grid act as a whole heterogeneous network. While SCADA system and Telco network can be well represented by means of discrete event simulators. To represent a Power grid a continuous

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Discrete Event Simulation of QoS of a SCADA System Interconnecting a Power Grid and a Telco Network  

Science Journals Connector (OSTI)

Indicators of Quality of Service (QoS) of Fault Isolation and System Restoration (FISR) service, delivered by SCADA system are computed, discussed and correlated to quality indicators of power supplied to custome...

Ester Ciancamerla; Chiara Foglietta

2010-01-01T23:59:59.000Z

22

Framework for SCADA Security Policy (October 2005) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Framework for SCADA Security Policy (October 2005) Framework for SCADA Security Policy (October 2005) Framework for SCADA Security Policy (October 2005) Modern automation systems used in infrastruc-ture (including Supervisory Control and Data Acquisition, or SCADA) have myriad security vulnerabilities. Many of these relate directly to inadequate security administration, which precludes truly effective and sustainable security. Adequate security management mandates a clear administrative struc-ture and enforcement hierarchy. The security policy is the root document, with sections covering purpose, scope, posi-tions, responsibilities, references, revision history, enforce-ment, and exceptions for various subjects relevant for system security. It covers topics including the overall security risk management program, data security, platforms,

23

Cyber Assessment Methods for SCADA Security | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Assessment Methods for SCADA Security Assessment Methods for SCADA Security Cyber Assessment Methods for SCADA Security This paper describes vulnerability assessment methodologies used in ongoing research and assessment activities designed to identify and resolve vulnerabilities so as to improve the security of the nation's critical infrastructure. The terrorist attacks of September 11, 2001 brought to light threats and vulnerabilities that face the United States. In response, the U.S. Government is directing the effort to secure the nation's critical infrastructure by creating programs to implement the National Strategy to Secure Cyberspace (1). One part of this effort involves assessing Supervisory Control and Data Acquisition (SCADA) systems. These systems are essential to the control of critical elements of our national

24

Sustainable Acquisition Coding System | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Sustainable Acquisition Coding System Sustainable Acquisition Coding System Sustainable Acquisition Coding System Sustainable Acquisition Coding System More Documents &...

25

Lessons Learned from Cyber Security Assessments of SCADA and Energy Management Systems  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Enhancing control systems security in the energy sector NSTB September 2006 LESSONS LEARNED FROM CYBER SECURITY ASSESSMENTS OF SCADA AND ENERGY MANAGEMENT SYSTEMS Raymond K. Fink David F. Spencer Rita A. Wells NSTB INL/CON-06-11665 iii ABSTRACT Results from ten cyber security vulnerability assessments of process control, SCADA, and energy management systems, or components of those systems, were reviewed to identify common problem areas. The common vulnerabilities identified ranged from conventional IT security issues to specific weaknesses in control system protocols. In each vulnerability category, relative measures were assigned to the severity of the vulnerability and

26

Secure SCADA Communication ProtocolPerformance Test Results | Department of  

Broader source: Energy.gov (indexed) [DOE]

SCADA Communication ProtocolPerformance Test Results SCADA Communication ProtocolPerformance Test Results Secure SCADA Communication ProtocolPerformance Test Results The Pacific Northwest National Laboratory (PNNL) was tasked to evaluate the cryptographic implementation and performance impact of the Secure SCADA Communication Protocol (SSCP) upon supervisory control and data acquisition (SCADA) communications. This report presents performance test data derived from proof of concept implementations of the SSCP. Secure SCADA Communication Protocol Performance Test Results More Documents & Publications AGA-12, Part 2 Performance Test Results AGA 12, Part 2 Performance Test Plan Hallmark Project Commercialization of the Secure SCADA Communications Protocol, a cryptographic security solution for device-to-device

27

Cyber Assessment Methods for SCADA Security  

Broader source: Energy.gov (indexed) [DOE]

5 by ISA - The Instrumentation, Systems and Automation Society. 5 by ISA - The Instrumentation, Systems and Automation Society. Presented at 15th Annual Joint ISA POWID/EPRI Controls and Instrumentation Conference http://www.isa.org Cyber Assessment Methods for SCADA Security May Robin Permann Kenneth Rohde Staff Computer Security Researcher Information & Communications Systems Cyber Security Technologies Idaho National Laboratory Idaho National Laboratory Idaho Falls, ID 83415 Idaho Falls, ID 83415 KEYWORDS Supervisory Control and Data Acquisition, SCADA, Cyber Security, Testing, Assessment ABSTRACT The terrorist attacks of September 11, 2001 brought to light threats and vulnerabilities that face the United States. In response, the U.S. Government is directing the effort to secure the nation's critical

28

Data acquisition system  

DOE Patents [OSTI]

A data acquisition circuit for a particle detection system that allows for time tagging of particles detected by the system. The particle detection system screens out background noise and discriminate between hits from scattered and unscattered particles. The detection system can also be adapted to detect a wide variety of particle types. The detection system utilizes a particle detection pixel array, each pixel containing a back-biased PIN diode, and a data acquisition pixel array. Each pixel in the particle detection pixel array is in electrical contact with a pixel in the data acquisition pixel array. In response to a particle hit, the affected PIN diodes generate a current, which is detected by the corresponding data acquisition pixels. This current is integrated to produce a voltage across a capacitor, the voltage being related to the amount of energy deposited in the pixel by the particle. The current is also used to trigger a read of the pixel hit by the particle.

Shapiro, Stephen L. (14228 Amherst Ct., Los Altos Hills, CA 94022); Mani, Sudhindra (1618 17th St., Sacramento, CA 95814); Atlas, Eugene L. (440 De Anza Ct., Oceanside, CA 92057); Cords, Dieter H. W. (526 Cuesta Real, La Honda, CA 94020); Holbrook, Britt (4540 Varsity Ct., Sacramento, CA 95841)

1997-01-01T23:59:59.000Z

29

Practical Knowledge about Data: Acquisition, Metering, Monitoring, and Management  

E-Print Network [OSTI]

control strategy based on the data acquired, then the project will take on other costs. If an energy management control system (EMCS), a building automation system (BAS) or a supervisory control and data acquisition (SCADA) system already exists...

Herrin, D.

2002-01-01T23:59:59.000Z

30

Quantitative Cyber Risk Reduction Estimation Methodology for a Small Scada Control System  

SciTech Connect (OSTI)

We propose a new methodology for obtaining a quick quantitative measurement of the risk reduction achieved when a control system is modified with the intent to improve cyber security defense against external attackers. The proposed methodology employs a directed graph called a compromise graph, where the nodes represent stages of a potential attack and the edges represent the expected time-to-compromise for differing attacker skill levels. Time-to-compromise is modeled as a function of known vulnerabilities and attacker skill level. The methodology was used to calculate risk reduction estimates for a specific SCADA system and for a specific set of control system security remedial actions. Despite an 86% reduction in the total number of vulnerabilities, the estimated time-to-compromise was increased only by about 3 to 30% depending on target and attacker skill level.

Miles A. McQueen; Wayne F. Boyer; Mark A. Flynn; George A. Beitel

2006-01-01T23:59:59.000Z

31

The testing workstation: A universal testing framework for Hydro-Quebec`s new SCADA/EMS  

SciTech Connect (OSTI)

Hydro-Quebec is in the process of renewing its Energy Management System (EMS) and its SCADA. Part of this work involves the introduction of a new data acquisition architecture. The proposed architecture requires that many systems now in operation be modified. This article describes a specialized Testing Workstation (TW) which provides all the testing capabilities needed to validate the full operation of the systems in the new communications environment. These include RTUs, other acquisition systems and even the new SCADA/EMS itself. The TW offers an extensive set of tools: communications analyzer, application data monitor, automatic and script-based simulators, allowing full testing of any system using the communications protocol of the new SCADA/EMS. The testing can be either at the communications level or at the application level. Since the TW has full database capabilities for field data, it can act both as a client (SCADA) and as a server (e.g. RTU). For Hydro-Quebec, the TW offers the advantage of standardizing the testing process used during the development of the new systems. The use of universal test equipment facilitates the integration of all systems into the new SCADA/EMS environment.

Clermont, S.; Boule, R.; Brouillette, L.; Poulin, P.

1995-12-31T23:59:59.000Z

32

Retrofit SCADA installation combines SCADA and process control functions  

SciTech Connect (OSTI)

When Gulf States Utilities Company`s (now part of Entergy Operations, Inc.) River Bend Nuclear Plant, decided to add a closed cooling water system for the plant service water, a new SCADA system was required. Previously the normal service water system shared common cooling towers and flume with the plant`s circulating water system. Closing the system required a new cooling tower with pumps and heat exchangers to be constructed in a remote location. Existing equipment in the area was controlled via a multichannel tone SCADA system that did not have sufficient spare capacity for control of the new components. This paper will discuss how a new SCADA system was designed and installed, that also included process control. It will also address the operational experience to date.

Moffitt, T.O. [Entergy Operations, Inc., St. Francisville, LA (United States)

1995-09-01T23:59:59.000Z

33

"Data Acquisition Systems"  

SciTech Connect (OSTI)

This project involved support for Lou Costrell and myself in the development of IEEE and IEC standards for nuclear counting and data acquisition systems. Over the years, as a result of this support, Lou and I were able to attend standards meetings of IEEE and IEC, which led directly to the publication of many standards for NIM systems, FastBus and CAMAC. We also chaired several writing committees as well as ANSI N42 (Nuclear instrumentation), IEEE NIM (NIM standard), IEEE NID (NPSS nuclear instruments and detector) and IEC TC45 WG9 (Nuclear instrumentation). Through this support we were able to assure that the interests of the US and DOE were expressed and implemented in the various standards.

Unterweger, Michael; Costrell, Louis deceased

2009-07-07T23:59:59.000Z

34

National SCADA Test Bed Fact Sheet  

Broader source: Energy.gov (indexed) [DOE]

PROTECTING ENERGY INFRASTRUCTURE BY IMPROVING THE SECURITY OF CONTROL SYSTEMS PROTECTING ENERGY INFRASTRUCTURE BY IMPROVING THE SECURITY OF CONTROL SYSTEMS Improving the security of energy control systems has become a national priority. Since the mid-1990's, security experts have become increasingly concerned about the threat of malicious cyber attacks on the vital supervisory control and data acquisition (SCADA) and distributed control systems (DCS) used to monitor and manage our energy infrastructure. Many of the systems still in use today were designed to operate in closed, proprietary networks. Increasing use of common software and operating systems and connection to public telecommunication networks and the Internet have made systems more reliable and efficient-but also more

35

Vulnerability assessment of water supply systems for insufficient fire flows  

E-Print Network [OSTI]

and Data Acquisition (SCADA) systems. Generally speaking, SCADA systems are the monitoring and control systems in the utility industries which help in operating the water system components with proper timing and sequence, measuring water quality... parameters, etc., without physically accessing the network. Thus, SCADA systems can reduce operating cost for a water utility and thereby increase a water system?s efficiency. The proposed hardening methodology of the water supply system was based...

Kanta, Lufthansa Rahman

2009-05-15T23:59:59.000Z

36

4162 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 28, NO. 4, NOVEMBER 2013 Power System State Estimation Using PMUs With  

E-Print Network [OSTI]

. NOMENCLATURE: PMU Phasor measurement unit. SCADA Supervisory control and data acquisition. GPS Global, Kalman filtering, phase mismatch, phasor measurement unit (PMU), state estimation, synchronization]­[7]. The traditional supervisory control and data acquisition (SCADA) system has a low reporting rate and requires

Nehorai, Arye

37

Aerial robotic data acquisition system  

SciTech Connect (OSTI)

A small, unmanned aerial vehicle (UAV), equipped with sensors for physical and chemical measurements of remote environments, is described. A miniature helicopter airframe is used as a platform for sensor testing and development. The sensor output is integrated with the flight control system for real-time, interactive, data acquisition and analysis. Pre-programmed flight missions will be flown with several sensors to demonstrate the cost-effective surveillance capabilities of this new technology.

Hofstetter, K.J.; Hayes, D.W.; Pendergast, M.M. [Westinghouse Savannah River Co., Aiken, SC (United States); Corban, J.E. [Guided Systems Technologies, Atlanta, GA (United States)

1993-12-31T23:59:59.000Z

38

National SCADA Test Bed | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cybersecurity » Energy Delivery Systems Cybersecurity Cybersecurity » Energy Delivery Systems Cybersecurity » National SCADA Test Bed National SCADA Test Bed Created in 2003, the National SCADA Test Bed (NSTB) is a one-of-a-kind national resource that draws on the integrated expertise and capabilities of the Argonne, Idaho, Lawrence Berkeley, Los Alamos, Oak Ridge, Pacific Northwest, and Sandia National Laboratories to address the cybersecurity challenges of energy delivery systems. Core and Frontier Research The NSTB core capabilities combine a network of the national labs' state-of-the-art operational system testing facilities with expert research, development, analysis, and training to discover and address critical security vulnerabilities and threats the energy sector faces. NSTB offers testing and research facilities, encompassing field-scale control

39

National Geothermal Data Systems Data Acquisition and Access...  

Broader source: Energy.gov (indexed) [DOE]

National Geothermal Data Systems Data Acquisition and Access National Geothermal Data Systems Data Acquisition and Access Project objective: To support the acquisition of new and...

40

Optimal monitoring and visualization of steady state power system operation  

E-Print Network [OSTI]

the Supervisory Control and Data Acquisition System (SCADA) and feeding them into state estimation function, state estimation can provide an estimate for all measured and unmeasured electrical quantities and network parameters of the entire power system, detect...

Xu, Bei

2009-06-02T23:59:59.000Z

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

21 Steps to Improve Cyber Security of SCADA Networks | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1 Steps to Improve Cyber Security of SCADA Networks 1 Steps to Improve Cyber Security of SCADA Networks 21 Steps to Improve Cyber Security of SCADA Networks Supervisory control and data acquisition (SCADA) networks contain computers and applications that perform key functions in providing essential services and commodities (e.g., electricity, natural gas, gasoline, water, waste treatment, transportation) to all Americans. As such, they are part of the nation's critical infrastructure and require protection from a variety of threats that exist in cyber space today. By allowing the collection and analysis of data and control of equipment such as pumps and valves from remote locations, SCADA networks provide great efficiency and are widely used. However, they also present a security risk. 21 Steps to Improve Cyber Security of SCADA Networks

42

Microsoft Word - SCADA CX.doc  

Broader source: Energy.gov (indexed) [DOE]

8, 2010 8, 2010 REPLY TO ATTN OF: Claire Bingaman KEC-4 SUBJECT: Environmental Clearance Memorandum James Hall Project Manager - TPC-TPP-4 Proposed Action: SCADA Upgrades at BPA's Hungry Horse, Bonneville, and Grand Coulee Substations Budget Information: Hungry Horse: WO# 00246171, Task 01 Bonneville: WO# 00246173, Task 01 Grand Coulee: WO# 00246244, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power facilities that would not affect the environment beyond the previously developed facility area.... Location: Grant County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install Supervisory Control and Data Acquisition (SCADA) upgrades at the

43

Methodology for designing the fuzzy resolver for a radial distribution system fault locator  

E-Print Network [OSTI]

detection devices are not installed. Some other methods locate faults based on the status of protective devices and heavily rely on supervisory control and data acquisition (SCADA) systems, fault detectors, and communication channels. Due to economic..., supervisory control and data acquisition (SCADA) system, and/or automatic meter reading (AMR) systems were needed. In addition, the protection scheme should be known. Kumano [23] proposed a rule based expert system that also used the protective devices...

Li, Jun

2006-04-12T23:59:59.000Z

44

Cyber-security analysis in smart grid SCADA systems: A game theoretic approach.  

E-Print Network [OSTI]

??Power grid systems deliver electricity from suppliers that generate the power to be transmitted through grids of interconnected networks and distributed to customers. Smart grids (more)

Rudrapattana, Sudeeptha Ranganath 1989-

2013-01-01T23:59:59.000Z

45

Energy Systems Acquisitions Advisory Board Procedures  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Notice streamlines the Energy Systems Acquisition Advisory Board (ESAAB) process to ensure informed, objective, and documented Strategic and Major System Critical Decision, Baseline Change Proposal, and site selection final decisions. Does not cancel other directives.

1997-10-28T23:59:59.000Z

46

National SCADA Test Bed- Enhancing control systems security in the energy sector (September 2009)  

Broader source: Energy.gov [DOE]

Improving the security of energy control systems has become a national priority. Since the mid-1990s, security experts have become increasingly concerned about the threat of malicious cyber...

47

Chapter 1 - Acquisition Regulations System | Department of Energy  

Energy Savers [EERE]

- Acquisition Regulations System 1.1AcquisitionRegulationSystem0.pdf 1.2HeadofContractingActivity(HCA)Authority,Functions,andResponsibilities0.pdf...

48

Weapon Systems Acquisition for Defense Forces  

Science Journals Connector (OSTI)

Technology is changing the shape of warfare through multidimensional influences on the components of war-making machinery. Weapon system acquisitions by a countrys armed ... , owing to the longer life-period of

2004-01-01T23:59:59.000Z

49

U.S. DOE/OE National SCADA Test Bed Supports | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

U.S. DOE/OE National SCADA Test Bed Supports U.S. DOE/OE National SCADA Test Bed Supports U.S. DOE/OE National SCADA Test Bed Supports To help advance the U.S. Department of Energy (DOE) National SCADA Test Bed's (NSTB) efforts to enhance control system security in the energy sector, DOE's Office of Electricity Delivery and Energy Reliability (OE) recently awarded a total of nearly $8 million to fund five industry-led projects: Hallmark Project. (PDF 789 KB) Will commercialize the Secure SCADA Communications Protocol (SSCP), which marks SCADA messages with a unique identifier that must be authenticated before the function is carried out, ensuring message integrity. (Lead: Schweitzer Engineering Laboratories; Partners: Pacific Northwest National Laboratories, CenterPoint Energy) Detection and Analysis of Threats to the Energy Sector (DATES) (PDF

50

DOE National SCADA Test Bed Program Multi-Year Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

National SCADA Test Bed Program Multi-Year Plan National SCADA Test Bed Program Multi-Year Plan DOE National SCADA Test Bed Program Multi-Year Plan This document presents the National SCADA Test Bed Program Multi-Year Plan, a coherent strategy for improving the cyber security of control systems in the energy sector. The NSTB Program is conducted within DOE's Office of Electricity Delivery and Energy Reliability (OE), which leads national efforts to modernize the electric grid, enhance the security and reliability of the energy infrastructure, and facilitate recovery from disruptions to the energy supply. The Plan covers the planning period of fiscal year 2008 to 2013. DOE National SCADA Test Bed Program Multi-Year Plan More Documents & Publications DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan

51

Enabling Sustainable Acquisition by Improving Procurement Systems  

Broader source: Energy.gov [DOE]

Fact sheet describes a case study of the Department of Energy Waste Pilot Plant (WIPP) enabling a sustainable acquisition by improving the procurement systems. The periodic review of the Environmental Management System (EMS) sub-systems is necessary to ensure that desired progress towards environmental objectives is being achieved.

52

Chapter 5 - Security Models for SCADA, ICS, and Smart Grid  

Science Journals Connector (OSTI)

Abstract This chapter describes security models for different Smart Grid protocols, including SCADA and ICS protocols. Many protocols are explained, along with their security models, interoperability, and methods and models of organizing them within an integrated system. Security methodologies are compared in order to create a working model for Smart Grid systems.

Eric D. Knapp; Raj Samani

2013-01-01T23:59:59.000Z

53

An Evaluation of Cybersecurity Assessment Tools on a SCADA Environment  

E-Print Network [OSTI]

An Evaluation of Cybersecurity Assessment Tools on a SCADA Environment Adam Hahn Department Email: gmani@iastate.edu Abstract--Increased concerns for electric grid cybersecurity has lead commonly used for traditional information technology (IT) systems are sufficient to meet the cybersecurity

Manimaran, Govindarasu

54

Single transmission line data acquisition system  

DOE Patents [OSTI]

A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensors monitor specific process variables and transmit measurement values over the single transmission line to a master station when addressed by the master station. Power for all remote stations (up to 980) is provided by driving the line with constant voltage supplied from the master station and automatically maintained independent of the number of remote stations directly connected to the line. The transmission line can be an RG-62 coaxial cable with lengths up to about 10,000 feet with branches up to 500 feet. The remote stations can be attached randomly along the line. The remote stations can be scanned at rates up to 980 channels/second.

Fasching, George E. (Morgantown, WV)

1984-01-01T23:59:59.000Z

55

MODELING SECURITY IN CYBER-PHYSICAL SYSTEMS  

E-Print Network [OSTI]

novel aspects of networked systems that include integrating dis- tributed computing systems with monitoring and controlling entities in the physical environment. For example, in real-time control systems stations. Other examples include smart grid systems and supervisory control and data acquisition (SCADA

Burmester, Mike

56

Computer video acquisition and analysis system for biological data  

Science Journals Connector (OSTI)

......research-article ORIGINAL PAPERS Computer video acquisition and analysis system for biological...analyses. The image is acquired using a video camera and then digitized for subsequent...including DNA sequencing gels. Computer video acquisition and analysis system for biological......

Thomas P. Keenan; Stephen A. Krawetz

1988-03-01T23:59:59.000Z

57

SCADA protocol vulnerabilities  

Science Journals Connector (OSTI)

The majority of network traffic in process control networks is generated by industrial communication protocols, whose implementation represents a considerable part of the code that runs in process control systems. Consequently a large number of attack ...

Julian L. Rrushi

2012-01-01T23:59:59.000Z

58

Definition: Supervisory Control And Data Acquisition | Open Energy  

Open Energy Info (EERE)

Supervisory Control And Data Acquisition Supervisory Control And Data Acquisition Jump to: navigation, search Dictionary.png Supervisory Control And Data Acquisition A system of remote control and telemetry used to monitor and control the transmission system.[1] View on Wikipedia Wikipedia Definition SCADA (supervisory control and data acquisition) generally refers to industrial control systems: computer systems that monitor and control industrial, infrastructure, or facility-based processes, as described below: Industrial processes include those of manufacturing, production, power generation, fabrication, and refining, and may run in continuous, batch, repetitive, or discrete modes. Infrastructure processes may be public or private, and include water treatment and distribution, wastewater collection and treatment, oil and gas pipelines, electrical power

59

A nuclear data acquisition system flow control model  

SciTech Connect (OSTI)

A general Petri Net representation of a nuclear data acquisition system model is presented. This model provides for the unique requirements of a nuclear data acquisition system including the capabilities of concurrently acquiring asynchronous and synchronous data, of providing multiple priority levels of flow control arbitration, and of permitting multiple input sources to reside at the same priority without the problem of channel lockout caused by a high rate data source. Finally, a previously implemented gamma camera/physiological signal data acquisition system is described using the models presented.

Hack, S.N.

1988-02-01T23:59:59.000Z

60

Department of Energy Acquisition System - A Guide for Executives |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Department of Energy Acquisition System - A Guide for Executives Department of Energy Acquisition System - A Guide for Executives Department of Energy Acquisition System - A Guide for Executives The principal purposes of the Department's acquisition system are to: Deliver on a timely basis the best value product or service to the customer by, for example, Maximizing the use of commercial products and services. Using contractors who have a track record of successful past performance or who demonstrate a current superior ability to perform. Promoting competition. Maintain the public's trust by conducting business with integrity, fairness, openness, and compliance with statutory and regulatory requirements. Minimize administrative operating costs Fulfill public policy objectsives, such as Providing opportunities for small and small disadvantaged business.

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Annotated Production Systems: A Model for Skill Acquisition  

E-Print Network [OSTI]

Annotated Production Systems provide a procedural model for skill acquisition by augmenting a production model of the skill with formal commentary describing plans, bugs, and interraltionships between various productions. ...

Goldstein, Ira P.

1977-02-01T23:59:59.000Z

62

The data acquisition system for the ANTARES neutrino telescope  

E-Print Network [OSTI]

The ANTARES neutrino telescope is being constructed in the Mediterranean Sea. It consists of a large three-dimensional array of photo-multiplier tubes. The data acquisition system of the detector takes care of the digitisation of the photo-multiplier tube signals, data transport, data filtering, and data storage. The detector is operated using a control program interfaced with all elements. The design and the implementation of the data acquisition system are described.

J. A. Aguilar; ANTARES collaboration

2006-10-02T23:59:59.000Z

63

Phasor Measurement Unit Data in Power System State Estimation  

E-Print Network [OSTI]

by supervisory control and data acquisition (SCADA) devices. The incorporation of PMU measurementsPhasor Measurement Unit Data in Power System State Estimation Intermediate Project Report Power Center since 1996 PSERC #12;Power Systems Engineering Research Center Phasor Measurement Unit Data

64

On The Impact of Communication Delays on Power System Automatic Generation Control Performance  

E-Print Network [OSTI]

and physical components that, under visions such as the US Department of Energy Smart Grid [1], are likely of the smart grid vision. Supervisory control and data acquisition (SCADA) systems, as computer an impact on system metrics, e.g., frequency deviations from its nominal value. The AGC system takes

Liberzon, Daniel

65

Cyber Security Audit and Attack Detection Toolkit: National SCADA Test Bed  

Broader source: Energy.gov (indexed) [DOE]

Audit and Attack Detection Toolkit: National SCADA Audit and Attack Detection Toolkit: National SCADA Test Bed May 2008 Cyber Security Audit and Attack Detection Toolkit: National SCADA Test Bed May 2008 This project of the cyber security audit and attack detection toolkit is adding control system intelligence to widely deployed enterprise vulnerability scanners and security event managers While many energy utilities employ vulnerability scanners and security event managers (SEM) on their enterprise systems, these tools often lack the intelligence necessary to be effective in control systems. This two-year project aims to integrate control system intelligence into widely deployed vulnerability scanners and SEM, and to integrate security incident detection intelligence into control system historians. These upgrades will

66

Intermediate SCADA Security Training Course Slides (September 2006)  

Broader source: Energy.gov [DOE]

Presentation for Intermediate SCADA Security, SS-2 SANS SCADASummit, September 28-29, 2006. The class enabledattendeesto develop an understanding of toolsand methods that can be used to...

67

Department of Energy Acquisition System - A Guide for Executives  

Broader source: Energy.gov (indexed) [DOE]

MA-0517 MA-0517 The Department of Energy ACQUISITION SYSTEM A Guide for Executives U.S. Department of Energy Office of Procurement and Assistance Management July 9, 2009 Washington, DC 20585-0705 THE DEPARTMENT OF ENERGY ACQUISTION SYSTEM 1 Every year the Department of Energy spends over 90% of its budget on purchases from the private sector. Because of the Federal Government's special fiduciary relationship, the acquisition system established to manage these expenditures of taxpayer monies is very different in some respects from commercial transactions between private parties. This guide provides information to understand the Department's acquisition system, to use the system effectively, and to avoid ethical and conflict of interest problems.

68

On the Failure of Power System Automatic Generation Control due to Measurement Noise  

E-Print Network [OSTI]

of the Supervisory Control and Data Acquisition (SCADA) system that resides in a centralized location (typically of service attacks, and resort to other malicious actions [2]. Various false data detection techniques based PMU measurements by spoofing the clocks that they use for synchronization [7]. Apart from malicious

Liberzon, Daniel

69

Waste retrieval sluicing system data acquisition system acceptance test report  

SciTech Connect (OSTI)

This document describes the test procedure for the Project W-320 Tank C-106 Sluicing Data Acquisition System (W-320 DAS). The Software Test portion will test items identified in the WRSS DAS System Description (SD), HNF-2115. Traceability to HNF-2115 will be via a reference that follows in parenthesis, after the test section title. The Field Test portion will test sensor operability, analog to digital conversion, and alarm setpoints for field instrumentation. The W-320 DAS supplies data to assist thermal modeling of tanks 241-C-106 and 241-AY-102. It is designed to be a central repository for information from sources that would otherwise have to be read, recorded, and integrated manually. Thus, completion of the DAS requires communication with several different data collection devices and output to a usable PC data formats. This test procedure will demonstrate that the DAS functions as required by the project requirements stated in Section 3 of the W-320 DAS System Description, HNF-2115.

Bevins, R.R.

1998-07-31T23:59:59.000Z

70

Beacon data acquisition and display system  

DOE Patents [OSTI]

A system for transmitting aircraft beacon information received by a secondary surveillance radar through telephone lines to a remote display includes a digitizer connected to the radar for preparing a serial file of data records containing position and identification information of the beacons detected by each sweep of the radar. This information is transmitted through the telephone lines to a remote computer where it is displayed.

Skogmo, David G. (Albuquerque, NM); Black, Billy D. (Albuquerque, NM)

1991-01-01T23:59:59.000Z

71

Beacon data acquisition and display system  

DOE Patents [OSTI]

A system for transmitting aircraft beacon information received by a secondary surveillance radar through telephone lines to a remote display includes a digitizer connected to the radar for preparing a serial file of data records containing position and identification information of the beacons detected by each sweep of the radar. This information is transmitted through the telephone lines to a remote computer where it is displayed. 6 figures.

Skogmo, D.G.; Black, B.D.

1991-12-17T23:59:59.000Z

72

A Complex Multitasked Data Acquisition and Control System for Measuring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Complex Multitasked Data Acquisition and Control System for Measuring Complex Multitasked Data Acquisition and Control System for Measuring Window Thermal Efficiency, or How TSX+ Saved Our Project When It Outgrew RT-11 Title A Complex Multitasked Data Acquisition and Control System for Measuring Window Thermal Efficiency, or How TSX+ Saved Our Project When It Outgrew RT-11 Publication Type Conference Paper LBNL Report Number LBL-30613 Year of Publication 1991 Authors Yazdanian, Mehry, J. Randy Michelson, and Guy O. Kelley Conference Name U.S. DECUS Spring 1991 Symposium, May 6-10, 1991 Date Published 05/1991 Conference Location Atlanta, GA Other Numbers Mo-282 Abstract The Mobile Window Thermal Test facility (MoWiTT) predicts the energy efficiency of windows by continuously measuring the net heat transfer into and out of two room-sized calorimeters. The system consists of a data acquisition/control unit which communicates through a General Purpose Interface bus (GPIB IEEE-488) with an LSI-11/23 computer. We wrote the software in FORTRAN 77 and run it under TSX+ using detached jobs, the message facility, and shared run time systems to execute nine 64KB jobs which simultaneously take data and store it on disk. We arbitrate the access to a single scanner on the GPIB by running a SERVER task which acts as a virtual machine to serialize the requests. We can control and monitor the system remotely and run a number of interactive jobs without interfering with the data collection tasks. We cover a description of the hardware; the software requirements, including the libraries to control the data collection and drive the hardware; the system architecture, including a block diagram; design considerations to meet real-world requirements; and the problems we discovered along the way and the solutions we found either to correct or to bypass them.

73

The Brookhaven National Laboratory experiment 871 data acquisition system  

SciTech Connect (OSTI)

A data acquisition system, capable of handling high data rates, has been developed for Brookhaven AGS Experiment 871. Carefully selected data from front end crates are loaded into dual port memory modules connected to 8 SGI V35 processors, where a software {open_quotes}event quality{close_quotes} trigger further reduces the data. The data are uploaded to a host IBM RS/6000 53H through two RPC client/server pairs.

Martin, R.D.; Hancock, A.D. [College of William and Mary, Williamsburg, VA (United States); Connor, D.F. [Univ. of California, Irvine, CA (United States); Rubin, P.D. [Univ. of Richmond, VA (United States)

1994-12-31T23:59:59.000Z

74

E-Print Network 3.0 - acquisition system signal Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

On Equal-Gain Combining for Acquisition of Summary: forces the acquisition system to process the signal over long periods of time before getting a reliable... to the following...

75

Computer system design description for the spare pump mini-dacs data acquisition and control system  

SciTech Connect (OSTI)

The attached document outlines the computer software design for the mini data acquisition and control system (DACS), that supports the testing of the spare pump for Tank 241-SY-101, at the maintenance and storage facility (MASF).

Vargo, G.F. Jr.

1994-09-29T23:59:59.000Z

76

Application of a network perspective to DoD weapon system acquisition: an exploratory study .  

E-Print Network [OSTI]

??One of the foundations of military command and control is that authority must match responsibility. Yet in weapon system acquisition, a program manager is responsible (more)

Mantz, Ryan D.

2006-01-01T23:59:59.000Z

77

Single transmission line interrogated multiple channel data acquisition system  

DOE Patents [OSTI]

A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensor circuits each monitors a specific process variable and each transmits measurement values over a single transmission line to a master interrogating station when addressed by said master interrogating station. Typically, as many as 330 remote stations may be parallel connected to the transmission line which may exceed 7,000 feet. The interrogation rate is typically 330 stations/second. The master interrogating station samples each station according to a shared, charging transmit-receive cycle. All remote station address signals, all data signals from the remote stations/sensors and all power for all of the remote station/sensors are transmitted via a single continuous terminated coaxial cable. A means is provided for periodically and remotely calibrating all remote sensors for zero and span. A provision is available to remotely disconnect any selected sensor station from the main transmission line.

Fasching, George E. (Morgantown, WV); Keech, Jr., Thomas W. (Morgantown, WV)

1980-01-01T23:59:59.000Z

78

National Geothermal Data Systems Data Acquisition and Access  

Broader source: Energy.gov [DOE]

Project objective: To support the acquisition of new and legacy data from DOE-funded demonstration projects, the US Geological Survey, and other sources.

79

A power analysis and data acquisition system for ocean wave energy device testing  

Science Journals Connector (OSTI)

In the testing of ocean wave energy devices, the demand for a portable and robust data acquisition and electrical loading system has become apparent. This paper investigates the development of a 30kW inclusive system combining loading capabilities, real-time power analysis, and data acquisition for the testing of deployed ocean wave energy devices. Hardware results for ocean testing are included.

Ean Amon; Ted K.A. Brekken; Annette von Jouanne

2011-01-01T23:59:59.000Z

80

A microcomputer-based communication and data acquisition unit for coordinated control and monitoring of distribution system computer-based protective relays  

E-Print Network [OSTI]

already been proven in the substation environment. Mulder, Erickson, and Courts of the Bonneville 31 Power Administration used a fiber optic link to transfer encoded analog current from a CT line to a processing equipment (11) ~ They acheived a... and SCADA equipment, these systems may now be joined, resulting in the potential for more powerful system supervisory and protective functions. Protective Relaying Various types of protective relays exist to detect faults and protect the system. Line...

Halter, John Alan

2012-06-07T23:59:59.000Z

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Chapter 34 - Major Systems Acquisition | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating...

82

DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan | Department...  

Broader source: Energy.gov (indexed) [DOE]

OE National SCADA Test Bed Fiscal Year 2009 Work Plan DOEOE National SCADA Test Bed Fiscal Year 2009 Work Plan This document is designed to help guide and strengthen the DOEOE...

83

Data Acquisition System for Electric Vehicle's Driving Motor Test Bench Based on VC++  

Science Journals Connector (OSTI)

In order to solve such problems as great labor intensity, high cost, low efficiency and accuracy during the performance experiment for driving motor system of electric vehicles, and realize data acquisition automatically and synchronously, a data acquisition system for driving motor test bench based on visual instruments is designed. This data acquisition system can be used to obtain the driving motor's parameters of currents and voltages at the same time. This system's hardware is based on electric vehicle's motor test bench in Beijing Institute of Technology, and combined with PXI2010 data acquisition card from ADLINK Company. Visual c++ software is adopted as development tool. In this paper, the design and realization of the hardware and software are presented. Experiment results show that this system improves the efficiency and quality of testing task with high utility. And experiment data can be obtained accurately.

Song Qiang; Lv Chenguang

2012-01-01T23:59:59.000Z

84

Complexity within the Air Force acquisition system gaining insight from a theory of collapse  

E-Print Network [OSTI]

Joseph Tainter's theory of societal collapse is applied in an examination of the U.S. Air Force's aircraft acquisition system in order to gain insight into the enterprise's lagging performance. Theories of collapse at both ...

Marticello, Daniel Nicholas, Jr

2012-01-01T23:59:59.000Z

85

Experimental Results of Dynamic Load Scheduling in the CMS Data Acquisition System  

Science Journals Connector (OSTI)

The online Data Acquisition system of the Compact Muon Solenoid ... s Large Hadron Collider is designed to collect data corresponding to a single collision of particles, ... experimental results of employing a di...

Michal Simon; Hannes Sakulin; Stanislaw Kozielski

2013-01-01T23:59:59.000Z

86

User Manual for the AZ-101 Data Acquisition System (AS-101 DAS)  

SciTech Connect (OSTI)

User manual for the TK AZ-101 Waste Retrieval System Data Acquisition System. The purpose of this document is to describe use of the AZ-101 Data Acquisition System (AZ-101 DAS). The AZ-101 DAS is provided to fulfill the requirements for data collection and monitoring as defined in Letters of Instruction (LOI) from Numatec Hanford Corporation (NHC) to Fluor Federal Services (FFS). For a complete description of the system, including design, please refer to the AZ-101 DAS System Description document, RPP-5572.

BRAYTON, D.D.

2000-02-17T23:59:59.000Z

87

Workshop on data acquisition and trigger system simulations for high energy physics  

SciTech Connect (OSTI)

This report discusses the following topics: DAQSIM: A data acquisition system simulation tool; Front end and DCC Simulations for the SDC Straw Tube System; Simulation of Non-Blocklng Data Acquisition Architectures; Simulation Studies of the SDC Data Collection Chip; Correlation Studies of the Data Collection Circuit & The Design of a Queue for this Circuit; Fast Data Compression & Transmission from a Silicon Strip Wafer; Simulation of SCI Protocols in Modsim; Visual Design with vVHDL; Stochastic Simulation of Asynchronous Buffers; SDC Trigger Simulations; Trigger Rates, DAQ & Online Processing at the SSC; Planned Enhancements to MODSEM II & SIMOBJECT -- an Overview -- R.; DAGAR -- A synthesis system; Proposed Silicon Compiler for Physics Applications; Timed -- LOTOS in a PROLOG Environment: an Algebraic language for Simulation; Modeling and Simulation of an Event Builder for High Energy Physics Data Acquisition Systems; A Verilog Simulation for the CDF DAQ; Simulation to Design with Verilog; The DZero Data Acquisition System: Model and Measurements; DZero Trigger Level 1.5 Modeling; Strategies Optimizing Data Load in the DZero Triggers; Simulation of the DZero Level 2 Data Acquisition System; A Fast Method for Calculating DZero Level 1 Jet Trigger Properties and Physics Input to DAQ Studies.

NONE

1992-12-31T23:59:59.000Z

88

Acquisition Guide --------------------?  

Broader source: Energy.gov (indexed) [DOE]

Acquisition Procedures 1. Introduction Simplified Acquisition Procedures (SAP) are contracting methods designed to streamline the acquisition process and facilitate the...

89

A Portable Real Time Data Acquisition System for the Comparison of Floor Vibration Data with AISC Design Guide  

E-Print Network [OSTI]

A portable real time vibration measurement data acquisition system was assembled with the intentionA Portable Real Time Data Acquisition System for the Comparison of Floor Vibration Data with AISC. THEORETICAL BACKGROUND In response to the increasing incidence of vibration problems in modern floor systems

Hines, Eric

90

Development and testing of neutron pulse time stamping data acquisition system for neutron noise experiment  

Science Journals Connector (OSTI)

Abstract Statistical correlation techniques find applications in the analysis of zero power reactor noise and in passive neutron assay (PNA). A large number of apparently different techniques have been in use in these application areas and traditionally the electronics modules used for data acquisition and analysis is specific to the method used. In this paper we describe a data acquisition scheme developed by us, which is independent of the specific analysis method and can therefore be used for all of them. This is a neutron time stamping data acquisition system based on a timer card and an interface software to acquire and store the data in the required format. The system has been successfully tested with two statistically different types of neutron sources, namely a random Poisson source (PuBe) and a correlated source (a nuclear reactor).

Rajeev Kumar; M Yakub Ali; S.B. Degweker; S.C. Vishwasrao; R.T. Jadhav

2015-01-01T23:59:59.000Z

91

ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber...  

Broader source: Energy.gov (indexed) [DOE]

and Energy Utilities Form Consortium to Fund SCADAEMS Cyber Security Assessment at National SCADA Test Bed ABB and Energy Utilities Form Consortium to Fund SCADAEMS Cyber...

92

Case Study: Enabling Sustainable Acquisition by Improving Procurement Systems  

Broader source: Energy.gov (indexed) [DOE]

Using an Environmental Management Using an Environmental Management System to review existing proce- dures revealed new opportunities for improvement through changes in procurement systems. Enabling Sustainable Acquisiton by Improving Procurement Systems The Department of Energy Waste Isolation Pilot Plant (WIPP) is a repository for de- fense-generated transuranic waste. Recently, the site submitted a procurement lessons learned document to DOE headquarters. In the document, WIPP staff noted that peri- odic review of Environmental Management System (EMS) sub-systems is necessary to ensure that desired progress towards environmental objectives is being achieved. An internal review of these sub-systems in early 2010 found that the Affirmative

93

Computer system design description for SY-101 hydrogen mitigation test project data acquisition and control system (DACS-1). Revision 1  

SciTech Connect (OSTI)

This document provides descriptions of components and tasks that are involved in the computer system for the data acquisition and control of the mitigation tests conducted on waste tank SY-101 at the Hanford Nuclear Reservation. The system was designed and implemented by Los alamos National Laboratory and supplied to Westinghouse Hanford Company. The computers (both personal computers and specialized data-taking computers) and the software programs of the system will hereafter collectively be referred to as the DACS (Data Acquisition and Control System).

Truitt, R.W. [Westinghouse Hanford Co., Richland, WA (United States)

1994-08-24T23:59:59.000Z

94

An on-line data acquisition system based on a NORSK DATA ND-100 computer  

Science Journals Connector (OSTI)

This paper describes a data acquisition system based on CAMAC for an ND-100 computer in a multiparameter environment. It consists of several real-time tasks which share common data and are synchronised to acquire events, record on magnetic tape, perform on-line analysis and permit display of one- and two-dimensional graphs so generated.

Amitava Roy; Praba kumar Dasgupta; Asismoy Bandyopadhyay; Swapan Kumar De

1991-01-01T23:59:59.000Z

95

USE OF THE AERIAL MEASUREMENT SYSTEM HELICOPTER EMERGENCY RESPONSE ACQUISITION SYSTEMS WITH GEOGRAPHIC INFORMATION SYSTEM FOR RADIOACTIVE SOIL REMEDIATION - [11504  

SciTech Connect (OSTI)

The Aerial Measurement System (AMS) Helicopter Emergency Response Acquisition System provides a thorough and economical means to identify and characterize the contaminants for large area radiological surveys. The helicopter system can provide a 100-percent survey of an area that qualifies as a scoping survey under the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) methodology. If the sensitivity is adequate when compared to the clean up values, it may also be used for the characterization survey. The data from the helicopter survey can be displayed and manipulated to provide invaluable data during remediation activities.

BROCK CT

2011-02-15T23:59:59.000Z

96

Honeywell experion system for teaching purposes.  

E-Print Network [OSTI]

??Honeywell Experion Process Knowledge System (PKS) is an advanced Distributed Control system with integrated advanced process automation platform. The platform integrates both DCS and SCADA (more)

Gumireddy, Kiranmai

2014-01-01T23:59:59.000Z

97

National SCADA Test Bed | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

be run locally to provide hardware supply chain assurances, to large-scale high-performance computing services that can statistically analyze systems of systems to identify...

98

Hardware and Software Developments for the Accurate Time-Linked Data Acquisition System  

SciTech Connect (OSTI)

Wind-energy researchers at Sandia National Laboratories have developed a new, light-weight, modular data acquisition system capable of acquiring long-term, continuous, multi-channel time-series data from operating wind-turbines. New hardware features have been added to this system to make it more flexible and permit programming via telemetry. User-friendly Windows-based software has been developed for programming the hardware and acquiring, storing, analyzing, and archiving the data. This paper briefly reviews the major components of the system, summarizes the recent hardware enhancements and operating experiences, and discusses the features and capabilities of the software programs that have been developed.

BERG,DALE E.; RUMSEY,MARK A.; ZAYAS,JOSE R.

1999-11-09T23:59:59.000Z

99

FResHU F3 Green Symposia Series #6 Acquisition of neo-sex chromosomes and sex-determining system  

E-Print Network [OSTI]

FResHU F3 Green Symposia Series #6 Acquisition of neo-sex chromosomes and sex-determining system" Registration free This symposium is held as FResHU F3 Green Symposia Series promoting the fresh and active

Ishii, Hitoshi

100

An on-line data acquisition system based on Norsk-Data ND-560 computer  

Science Journals Connector (OSTI)

This paper describes a high-speed data acquisition system based on CAMAC for Norsk Data ND-560 computer operating in a multiuser environment. As opposed to the present trend, the system has been implemented with minimum hardware at CAMAC level taking advantage of the dual processors of ND-560. The package consists of several coordinated tasks running in the two \\{CPUs\\} which acquire data, record on tape, permit on-line analysis and display the data and perform related control operations. It has been used in several experiments at VECC and its performance in on-line experiments is reported.

Asismoy Bandyopadhyay; Amitava Roy; Swapan Kumar Dey; Sailajananda Bhattacharya; Ranjan Kumar Bhowmik

1987-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

The development of a portable data acquisition system for use in commercial and industrial energy audits  

E-Print Network [OSTI]

above. This approach led to the ERAP system's being segmented into three major components: the Master Station (MS), the Digital Data Recorder (DDR), and the Data Acquisition Board (DAB). The three 16 components would be functionally similar... would be through serial I/O. From the MS to the DDR the serial communications would be via an RS232 serial port. The DDR would corrununicate with the DAB via an RS-485 serial port. Figure 3 is a block diagram of ERAP system. Master Station DDR RS...

Davis, Michael Andrew

2012-06-07T23:59:59.000Z

102

Introduction to SCADA Protection and Vulnerabilities  

SciTech Connect (OSTI)

Even though deregulation has changed the landscape of the electric utility industry to some extent, a typical large electric utility still owns power generation facilities, power transmission and distribution lines, and substations. Transmission and distribution lines form the segments or spokes of a utilitys grid. Power flow may change through these lines, but control of the system occurs at the nodes of the grid, the generation facilities, and substations. This section discusses each of these node types in more detail as well as how each is controlled.

Ken Barnes; Briam Johnson; Reva Nickelson

2004-03-01T23:59:59.000Z

103

New System For Tokamak T-10 Experimental Data Acquisition, Data Handling And Remote Access  

SciTech Connect (OSTI)

For carrying out the experiments on nuclear fusion devices in the Institute of Nuclear Fusion, Moscow, a system for experimental data acquisition, data handling and remote access (further 'DAS-T10') was developed and has been used in the Institute since the year 2000. The DAS-T10 maintains the whole cycle of experimental data handling: from configuration of data measuring equipment and acquisition of raw data from the fusion device (the Device), to presentation of math-processed data and support of the experiment data archive. The DAS-T10 provides facilities for the researchers to access the data both at early stages of an experiment and well afterwards, locally from within the experiment network and remotely over the Internet.The DAS-T10 is undergoing a modernization since the year 2007. The new version of the DAS-T10 will accommodate to modern data measuring equipment and will implement improved architectural solutions. The innovations will allow the DAS-T10 to produce and handle larger amounts of experimental data, thus providing the opportunities to intensify and extend the fusion researches. The new features of the DAS-T10 along with the existing design principles are reviewed in this paper.

Sokolov, M. M.; Igonkina, G. B.; Koutcherenko, I. Yu.; Nurov, D. N. [Institute of Nuclear Fusion, Russian Research Center 'Kurchatov Institute', 1, Kurchatov Sq., Moscow (Russian Federation)

2008-04-07T23:59:59.000Z

104

A high-speed data acquisition system to measure low-level current from self-powered flux detectors in CANDU nuclear reactors  

E-Print Network [OSTI]

A high-speed data acquisition system to measure low-level current from self-powered flux detectors in CANDU nuclear reactors

Lawrence, C B

1982-01-01T23:59:59.000Z

105

Reliability of the U.S. electric system -- Recent trends and current issues  

E-Print Network [OSTI]

Hours (SAIDI) and Events (SAIFI) that Have Resulted fromand Current Issues SAIDI SAIFI SC SCADA SERC SPP TO UPS VARof interruptions. 1. SAIFI (System Average Interruption

Osborn, Julie; Kawann, Cornelia

2002-01-01T23:59:59.000Z

106

E-Print Network 3.0 - acquisition system proposal Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collection: Engineering 20 Performance of a Parallel Acquisition Scheme for a Spread-Spectrum Packet Radio Communication Summary: -742, Korea ABSTRACT A matched-jlter...

107

The role of SCADA in developing a lean enterprise for municipal wastewater operations  

E-Print Network [OSTI]

Central to optimizing a wastewater system's operations is the collection of alarm and operational data from various remote locations throughout a municipality, hence the basic need for supervisory control and data acquisition ...

Prutz, Stanley J

2005-01-01T23:59:59.000Z

108

Development of an Integrated Distribution Management System  

SciTech Connect (OSTI)

This final report details the components, functionality, costs, schedule and benefits of developing an Integrated Distribution Management System (IDMS) for power distribution system operation. The Distribution Automation (DA) and Supervisory Control and Data Acquisition (SCADA) systems used by electric power companies to manage the distribution of electric power to retail energy consumers are vital components of the Nations critical infrastructure. Providing electricity is an essential public service and a disruption in that service, if not quickly restored, could threaten the public safety and the Nations economic security. Our Nations economic prosperity and quality of life have long depended on the essential services that utilities provide; therefore, it is necessary to ensure that electric utilities are able to conduct their operations safely and efficiently. A fully integrated technology of applications is needed to link various remote sensing, communications and control devices with other information tools that help guide Power Distribution Operations personnel. A fully implemented IDMS will provide this, a seamlessly integrated set of applications to raise electric system operating intelligence. IDMS will enhance DA and SCADA through integration of applications such as Geographic Information Systems, Outage Management Systems, Switching Management and Analysis, Operator Training Simulator, and other Advanced Applications, including unbalanced load flow and fault isolation/service restoration. These apps are capable of utilizing and obtaining information from appropriately installed DER, and by integrating disparate systems, the Distribution Operators will benefit from advanced capabilities when analyzing, controlling and operating the electric system.

Schatz, Joe E.

2010-10-20T23:59:59.000Z

109

Fox nuclear, biological, and chemical reconnaissance system: Lessons-learned from a foreign non-developmental item acquisition. Master`s thesis  

SciTech Connect (OSTI)

Non-developmental Item acquisition represent a viable approach to meet procurement needs of the Defense Department. The reduced acquisition cycle times and resultant cost savings of this acquisition strategy presents significant potential benefits to DoD. One weapon system program that has successfully used such an NDI strategy is the U.S. Army`s Fox Nuclear, Biological, and Chemical Reconnaissance System. This thesis examines the DoD acquisition process and how NDIs are used within the process. The thesis then examines the Fox Program and its NDI Acquisition strategy to determine what factors made the program successful. From this analysis, lessons-learned are identified that can be used by other acquisition managers and their staffs effectively to manage future NDI programs.

Norris, J.W.

1995-06-01T23:59:59.000Z

110

The IceCube data acquisition system: Signal capture, digitization,and timestamping  

SciTech Connect (OSTI)

IceCube is a km-scale neutrino observatory under construction at the South Pole with sensors both in the deep ice (InIce) and on the surface (IceTop). The sensors, called Digital Optical Modules (DOMs), detect, digitize and timestamp the signals from optical Cherenkov-radiation photons. The DOM Main Board (MB) data acquisition subsystem is connected to the central DAQ in the IceCube Laboratory (ICL) by a single twisted copper wire-pair and transmits packetized data on demand. Time calibration ismaintained throughout the array by regular transmission to the DOMs of precisely timed analog signals, synchronized to a central GPS-disciplined clock. The design goals and consequent features, functional capabilities, and initial performance of the DOM MB, and the operation of a combined array of DOMs as a system, are described here. Experience with the first InIce strings and the IceTop stations indicates that the system design and performance goals have been achieved.

The IceCube Collaboration; Matis, Howard

2009-03-02T23:59:59.000Z

111

ACQUISITION LETTER  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy No. 2001-03 Department of Energy No. 2001-03 Acquisition Regulation Date May 25, 2001 ACQUISITION LETTER This Acquisition Letter is issued under the authority of the Procurement Executives of DOE and NNSA. Subject: COSTS ASSOCIATED WITH WHISTLEBLOWER ACTIONS References: DEAR 931.205-47(h) DEAR 952.216-7, Alt II DEAR 970.3102-05-47(h) DEAR 970.5232-2, Payments and Advances When Does this Acquisition Letter Expire? This Acquisition Letter will expire when this guidance is distributed as an Acquisition Guide section or otherwise superseded. Whom Do You Contact for More Information? Contact Terry Sheppard of the Office of Procurement and Assistance Policy at (202) 586-8193 or terry.sheppard@hq.doe.gov Visit our website at www.pr.doe.gov for information on Acquisition Letters and other policy

112

7.0 - Integrated Acquisition Planning Process  

Broader source: Energy.gov (indexed) [DOE]

0 (August 2006) 0 (August 2006) 1 INTEGRATING ACQUISITION PLANNING PROCESSES - AN OVERVIEW REFERENCES 1. FAR Part 7 Acquisition Planning 2. FAR Part 34 Major System Acquisition 3. Acquisition Letter 2005-08R, Small Business Programs 4. Acquisition Guide Chapter 7.1, Acquisition Planning 5. Acquisition Guide Chapter 42.5, Contract Management Planning 6. DOE O 580.1 Department of Energy Property Management Program 7. DOE O 413.3 Program and Project Management for the Acquisition of Capital Assets Guiding Principles n Acquisition planning benefits from integrating independent planning processes and a team approach that includes appropriate representation

113

The IceCube data acquisition system for galactic core collapse supernova searches  

Science Journals Connector (OSTI)

The IceCube Neutrino Observatory was designed to detect highly energetic neutrinos. The detector was built as a lattice of 5160 photomultiplier tubes monitoring one cubic kilometer of clear Antarctic ice. Due to low photomultiplier dark noise rates in the cold and radio-pure ice IceCube is also able to detect bursts of O(10MeV) neutrinos expected to be emitted from core collapse supernovae. The detector will provide the worlds highest statistical precision for the lightcurves of galactic supernovae by observing an induced collective rise in all photomultiplier rates [1]. This paper presents the supernova data acquisition system the search algorithms for galactic supernovae as well as the recently implemented HitSpooling DAQ extension. HitSpooling will overcome the current limitation of transmitting photomultiplier rates in intervals of 1.6384 ms by storing all recorded time-stamped hits for supernova candidate triggers. From the corresponding event-based information the average neutrino energy can be estimated and the background induced by detector noise and atmospheric muons can be reduced.

2014-01-01T23:59:59.000Z

114

Data quality assurance controls through the WIPP (Waste Isolation Pilot Plant) In Situ Data Acquisition, Analysis, and Management System  

SciTech Connect (OSTI)

Assurance of data quality for the in situ tests fielded at the Waste Isolation Pilot Plant is of critical importance. These tests supply the information for development and verification of the technology required for construction of a radioactive waste repository in bedded salt. The tests are some of the largest ever fielded in an underground facility. To assure that the extensive output generated by the tests is compatible with the high standards of quality required, a major project task was undertaken for the acquisition, control, and preservation of the all the associated in situ test databases, with the principal emphasis on the very large thermal/structural in situ tests. In order to accomplish this task the WIPP In Situ Data Acquisition, Analysis, and Management (WISDAAM) System was put into place. The system provides for quality control of the test databases and certified test data throughout the duration of the tests. 13 refs., 14 figs., 3 tabs.

Munson, D.E. (Sandia National Labs., Albuquerque, NM (USA)); Ball, J.R. (RE/SPEC, Inc., Albuquerque, NM (USA)); Jones, R.L. (Tech. Reps., Inc., Albuquerque, NM (USA))

1990-08-01T23:59:59.000Z

115

ACQUISITION PLANNING  

Office of Environmental Management (EM)

PLANNING Guiding Principles Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory,...

116

Cyber Security Procurement Language for Control Systems Version 1.8 |  

Broader source: Energy.gov (indexed) [DOE]

Cyber Security Procurement Language for Control Systems Version 1.8 Cyber Security Procurement Language for Control Systems Version 1.8 Cyber Security Procurement Language for Control Systems Version 1.8 Supervisory Control and Data Acquisition (SCADA), Process Control System (PCS), Distributed Control System (DCS), etc. generally refer to the systems which control, monitor, and manage the nation's critical infrastructures such as electric power generators, subway systems, dams, telecommunication systems, natural gas pipelines, and many others. Simply stated, a control system gathers information and then performs a function based on established parameters or information it received. Cyber Security Procurement Language for Control Systems Version 1.8 More Documents & Publications AMI System Security Requirements - v1_01-1

117

Data acquisition user's guide-1 for fuel/engine evaluation system applied to an experimental air stirling engine. Technical note  

SciTech Connect (OSTI)

This technical note describes the Data Acquisition (DA) System used in the evaluation of Experimental Air Stirling Engine No. 1 which had previously been designed and built as a part of the Advanced Engines studies for the Fuels/Powerplants Technical Subprogram 25B. The DA system and capability is presented. Brief programming guidelines for controlling various peripheral electronic equipment through a mini-computer are given. The program software used in testing the Stirling engine is described. Finally, some limitations of the DA system are listed.

Bingham, I.R.; Webster, G.D.

1981-07-01T23:59:59.000Z

118

Int. J. Communication Networks and Distributed Systems, Vol. 6, No. 1, 2011 59 Copyright 2011 Inderscience Enterprises Ltd.  

E-Print Network [OSTI]

a central location. Control systems are widely used in critical infrastructures such as electric grid the control systems. American Gas Association (AGA), IEC TC57 WG15, IEEE, NIST and National SCADA Test Bed Program have been actively designing cryptographic standard to protect SCADA systems. American Gas

Wang, Yongge

119

Acquisition Guide  

Broader source: Energy.gov (indexed) [DOE]

_____Chapter 15.4-4 (July 2010) _____Chapter 15.4-4 (July 2010) GENERAL GUIDE FOR TECHNICAL ANALYSIS OF COST PROPOSALS FOR ACQUISITION CONTRACTS Acquisition Guide _____________________________________________________________ _______________________________________________________Chapter 15.4-4 (July 2010) TABLE OF CONTENT CHAPTER 1 - INTRODUCTION KEY CONCEPTS ........................................................................................1 LIST OF ACRONYMS...............................................................................1 RELATIONSHIP OF TECHNICAL ANALYSIS TO COST ANALYSIS ..................................2 RESPONSIBILITIES IN EVALUATING CONTRACTOR PROPOSALS ..................................2

120

Cyber Effects Analysis Using VCSE Promoting Control System Reliability |  

Broader source: Energy.gov (indexed) [DOE]

Cyber Effects Analysis Using VCSE Promoting Control System Cyber Effects Analysis Using VCSE Promoting Control System Reliability Cyber Effects Analysis Using VCSE Promoting Control System Reliability This report describes the Virtual Control System Environment (VCSE) technology- developed at Sandia National Laboratories-to investigate Supervisory Control And Data Acquisition (SCADA) vulnerabilities associated with energy systems; and it describes a set of experiments with findings from using that environment. The report explains how VCSE can be used to analyze and develop an understanding of cyber attacks. Specific analyses in this report focus on unencrypted, unsecured data channels on Internet protocol (IP)-routed computer networks within electric power systems. Cyber Effects Analysis Using VCSE Promoting Control System Reliability

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

Chapter 7.1 (May 2012 second revision) Chapter 7.1 (May 2012 second revision) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

122

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

-Chapter 7.1 (May 2012) -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

123

ACQUISITION LETTER  

Broader source: Energy.gov (indexed) [DOE]

No. 2009-04 No. 2009-04 Acquisition Regulation Date 02/12/09 ACQUISITION LETTER This Acquisition Letter is issued under the authority of the DOE and NNSA Procurement Executives. Subject: Management of Excess Weapons Inventories and Selective Sensitive Equipment. References: 41 Code of Federal Regulations (CFR) 109-1, Department of Energy (DOE) Federal Property Management Regulations 48 CFR 52.245-1, Government Property DOE Guide 580.1-1, DOE Personal Property Management Guide DOE Order 580.1-1, DOE Personal Property Management, Contractor Requirements Document (CRD), Attachment 2, as set forth in the DOE O 580.1 Department of Energy Acquisition Regulation 970.5245-1, Property Federal Acquisition Regulation Part 45, Government Property

124

E-Print Network 3.0 - automated knowledge acquisition Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

VIRTUAL SYSTEM ACQUISITION... acquisition more agile and adaptive, through evolutionary modeling, simulation, and development of the system... acquisition into a form we call...

125

Flight tests of a digital data acquisition system for analysis of ultrasonic pulse-echo signals used to measure ice accretion  

E-Print Network [OSTI]

A number of signal processing algorithms were developed for analyzing ultrasonic signals used to measure aircraft ice accretion in flight. A high speed digital signal acquisition system was designed and constructed to ...

Ryan, Justin Mark

1986-01-01T23:59:59.000Z

126

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

7.1 (May 2010) 7.1 (May 2010) 1 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination 13. FAR 34.004 Acquisition Strategy Guiding Principles

127

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

January 2011) January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

128

Acquisition Guide  

Broader source: Energy.gov (indexed) [DOE]

3.2 (November 2009) 3.2 (November 2009) PURCHASE ORDERS GUIDING PRINCIPLES J Purchase Orders should normally be issued on a fixed-price basis. J Modifications of Purchase Orders may be used for unpriced orders and for administrative matters on priced orders. J Purchase orders cannot exceed the simplified acquisition threshold. This section discusses the Department of Energy's (DOE) use of purchase orders as described in Federal Acquisition Regulation (FAR) 13.302 and the Department of Energy's Acquisition Regulation (DEAR) Section 91 3.304. Only contracting officers acting within the scope of their authority are empowered to execute purchase orders on behalf of DOE. Authority A. Federal Acquisition Regulation (FAR) Subpart 13.302. B. DEAR 913.307 Background When shouldpurchase orders be used? Due to the administrative cost of preparing and handling

129

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

OCTOBER 2010) OCTOBER 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

130

Acquisition Regulation  

Energy Savers [EERE]

the Government Paperwork Elimination Act FAR Subpart 4.5 Electronic Commerce in Contracting FAR Subpart 4.8 Government Contract Files FAR Subpart 7.1 Acquisition Plans DOE 0...

131

ACQUISITION LETTER  

Broader source: Energy.gov (indexed) [DOE]

ACQUISITION LETTER ACQUISITION LETTER AUTHORITY This Acquisition Letter (AL) is issued by the Procurement Executive pursuant to a delegation from the Secretary and under the authority of the Department of Energy Acquisition Regulation (DEAR) subsection 901.301-70. CONTENTS CITATION TITLE DEAR Part 933 Protests, Disputes, and Appeals I. Purpose. This AL establishes policy and provides guidance for the use of alternative dispute resolution techniques in connection with disputes that arise under the Contract Disputes Act (CDA) of 1978, 41 U.S.C. sections 601-613. This AL revision deletes references to "district court" which were incorrectly cited in paragraph four of the Policy section. II. Background. Alternative Dispute Resolution (ADR) refers to a range of procedures

132

Acquisition Guide  

Broader source: Energy.gov (indexed) [DOE]

Chapter 15.4-4 (December 2010) Chapter 15.4-4 (December 2010) GENERAL GUIDE FOR TECHNICAL ANALYSIS OF COST PROPOSALS FOR ACQUISITION CONTRACTS Acquisition Guide _____________________________________________________________ __________________________________________________Chapter 15.4-4 (November 2010) TABLE OF CONTENT CHAPTER 1 - INTRODUCTION KEY CONCEPTS ........................................................................................1 LIST OF ACRONYMS...............................................................................1 RELATIONSHIP OF TECHNICAL ANALYSIS TO COST ANALYSIS ..................................2 RESPONSIBILITIES IN EVALUATING CONTRACTOR PROPOSALS ..................................2 CHAPTER 2 - PREPARING TO EVALUATE A PROPOSAL

133

Good practice guide on firewall deployment for SCADA and process control networks  

Broader source: Energy.gov (indexed) [DOE]

FIREWALL DEPLOYMENT FOR SCADA AND FIREWALL DEPLOYMENT FOR SCADA AND PROCESS CONTROL NETWORKS GOOD PRACTICE GUIDE 15 FEBRUARY 2005 This paper was previously published by the National Infrastructure Security Co-ordination Centre (NISCC) - a predecessor organisation to the Centre for the Protection of National Infrastructure (CPNI). Hyperlinks in this document may refer to resources that no longer exist. Please see CPNI's website (www.cpni.gov.uk) for up-to-date information. Disclaimer Reference to any specific commercial product, process or service by trade name, trademark, manufacturer, or otherwise, does not constitute or imply its endorsement, recommendation, or favouring by CPNI. The views and opinions of authors expressed within this document shall not be used for advertising or product endorsement purposes.

134

A high dynamic range data acquisition system for a solid-state electron Electric Dipole Moment experiment  

E-Print Network [OSTI]

We have built a high precision (24-bit) data acquisition (DAQ) system with eight simultaneously sampling input channels for the measurement of the electric dipole moment (EDM) of the electron. The DAQ system consists of two main components, a master board and eight individual analog-to-digital converter (ADC) boards. This custom DAQ system provides galvanic isolation, with fiber optic communication, between the master board and each ADC board to reduce the possibility of ground loop pickups. In addition, each ADC board is enclosed in its own heavy-duty radio frequency shielding enclosure and powered by DC batteries, to attain the ultimate low levels of channel cross-talk. In this paper, we describe the implementation of the DAQ system and scrutinize its performance.

Young Jin Kim; Brandon Kunkler; Chen-Yu Liu; Gerard Visser

2011-06-07T23:59:59.000Z

135

Vulnerability Analysis of Energy Delivery Control Systems - 2011 |  

Broader source: Energy.gov (indexed) [DOE]

Vulnerability Analysis of Energy Delivery Control Systems - 2011 Vulnerability Analysis of Energy Delivery Control Systems - 2011 Vulnerability Analysis of Energy Delivery Control Systems - 2011 Cybersecurity for energy delivery systems has emerged as one of the Nation's most serious grid modernization and infrastructure protection issues. Cyber adversaries are becoming increasingly targeted, sophisticated, and better financed. The energy sector must research, develop and deploy new cybersecurity capabilities faster than the adversary can launch new attack tools and techniques. The goal of the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability (DOE/OE) National Supervisory Control and Data Acquisition (SCADA) Test Bed (NSTB) program is to enhance the reliability and resiliency of the Nation's energy infrastructure by reducing the risk

136

SunShot Initiative: Customer Acquisition  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Customer Acquisition to someone Customer Acquisition to someone by E-mail Share SunShot Initiative: Customer Acquisition on Facebook Tweet about SunShot Initiative: Customer Acquisition on Twitter Bookmark SunShot Initiative: Customer Acquisition on Google Bookmark SunShot Initiative: Customer Acquisition on Delicious Rank SunShot Initiative: Customer Acquisition on Digg Find More places to share SunShot Initiative: Customer Acquisition on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Balance of Systems Reducing Non-Hardware Costs Lowering Barriers Fostering Growth Customer Acquisition Photo of a woman, man, and child looking at a silver box on the outside of a home. The cost of acquiring customers and designing systems to fit their homes represents approximately 45% of all balance of systems costs in the U.S.

137

Redesign and Reconstruction of the Equipment Protection Systems for the Upgrading Front Ends and Beamlines at BSRF  

SciTech Connect (OSTI)

The BEPC(Beijing Electron-Positron Collider) is upgraded to be BEPCII, a two-ring Electron-Positron collider. Due to the construction of the BEPCII and upgrade of the existing front ends and beamlines, all the existing EPSs(Equipment Protection Systems) have to be redesigned and reconstructed at BSRF. All the redesigned EPSs for the upgrading front ends and beamlines are a PLC- and SCADA-based equipment protection and control and monitoring system. The EPSs are used to protect BEPCII two storage rings vacuum against vacuum failures in a beamline, as well as to protect the front-end and beamline components from being damaged by synchrotron radiation. For the high-power wiggler beam lines, a fast movable mask is used to protect the blade of a fast-closing valve from damage when the fast-closing valve is triggered to close, which does not need to dump the electron beam running in BEPCII outer ring. In addition, all redesigned PLC- based EPSs are used to communicate with the same centralized monitoring computer to monitor a variety of parameters from all PLC- based EPS systems. The monitoring computer runs the SCADA (Supervisory Control And Data Acquisition) software with its own web server. Graphical HMI interfaces are used to display a few overall views of all front-end equipment operation status and the further detailed information for each EPS in a different pop-up window. On the web services, the SCADA-based centralized monitoring system provides a web browse function, etc. The design of the reconstructed systems is described in this paper.

Xiong Shenshou; Tan Yinglei; Wu Xuehui [Beijing Synchrotron Radiation Laboratory, Institute of High Energy Physics, P. O. Box 918, Branch 2-7, Beijing 100049 (China)

2007-01-19T23:59:59.000Z

138

Using the HP-41CV calculator as a data acquisition system for personal carbon monoxide exposure monitors  

SciTech Connect (OSTI)

The use of small, personal monitors as instruments for air pollution data acquisition, storage, and retrieval presents a new set of monitoring considerations. Portability, ruggedness, power supplies, and data capture are functions to be addressed in designing personal monitoring systems. The emphasis herein is on the data capture function. This paper describes experiences using the Hewlett-Packard HP-41CV system as a data management system interfaced with personal carbon monoxide monitors (General Electric Carbon Monoxide Detector, Model 15EC53CO3). In general, the HP-41CV proved to be reliable, adaptable, and easy to use. Problems with the monitor power source (battery failure) were more frequent than with the HP-41CV itself. Using the HP-41CV for the specific data collection requirements of the Washington Microenvironment Study is a focal point of this presentation.

Fitz-Simons, T.; Sauls, H.B.

1984-09-01T23:59:59.000Z

139

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

--Chapter 7.1 (JUNE 2010) --Chapter 7.1 (JUNE 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles

140

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

PLANNING PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 6 Competition Requirements 4. FAR Part 7 Acquisition Planning 5. FAR Part 8 Required Sources of Supply 6. FAR Part 9 Contractor Qualifications 7. FAR Part 10 Market Research 8. FAR Part 11 Describing Agency Needs 9. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 10. FAR Subpart 16.1 Selecting Contract Types 11. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 12. FAR 17 Special Contracting Methods 13. FAR Part 19 Small Business Programs 14. FAR 25.802(a)(2) Other International Agreements and Coordination 15. FAR 34.004 Acquisition Strategy

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Acquisition News  

Broader source: Energy.gov (indexed) [DOE]

acquisition-news Office of Environmental Management acquisition-news Office of Environmental Management 1000 Independence Ave., SW Washington, DC 20585 202-586-7709 en Contract Awarded for Environmental Technical Services http://energy.gov/em/articles/contract-awarded-environmental-technical-services Contract Awarded for Environmental Technical Services

142

[Article 1 of 7: Motivates and Includes the Consumer  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of distribution Supervisory Control and Data Acquisition systems (SCADA) and demand response into today's grid. The current utilization rate of assets within a utility, if it...

143

Hallmark Project Commercialization of the Secure SCADA Communications...  

Broader source: Energy.gov (indexed) [DOE]

security solution for device-to-device communication Increased connectivity and automation in the control systems that manage the nation's energy infrastructure have improved...

144

Design of FPGA based high-speed data acquisition and real-time data processing system on J-TEXT tokamak  

Science Journals Connector (OSTI)

Abstract Tokamak experiment requires high-speed data acquisition and processing systems. In traditional data acquisition system, the sampling rate, channel numbers and processing speed are limited by bus throughput and CPU speed. This paper presents a data acquisition and processing system based on FPGA. The data can be processed in real-time before it is passed to the CPU. It provides processing ability for more channels with higher sampling rates than the traditional data acquisition system while ensuring deterministic real-time performance. A working prototype is developed for the newly built polarimeterinterferometer diagnostic system on the Joint Texas Experimental Tokamak (J-TEXT). It provides 16 channels with 120MHz maximum sampling rate and 16bit resolution. The onboard FPGA is able to calculate the plasma electron density and Faraday rotation angel. A RAID 5 storage device is adopted providing 700MB/s readwrite speed to buffer the data to the hard disk continuously for better performance.

W. Zheng; R. Liu; M. Zhang; G. Zhuang; T. Yuan

2014-01-01T23:59:59.000Z

145

Control and Data Acquisition System for Lower Hybrid Current Drive in Alcator C-Mod  

E-Print Network [OSTI]

. The construction of the LHCD system is a collaboration between Princeton Plasma Physics Laboratory (PPPL) and MIT. PPPL is responsible for the front-end of the system (grill, waveguide run); status of that part

Basse, Nils Plesner

146

Microsoft Word - 4March08_SCADA_Procurement.doc  

Broader source: Energy.gov (indexed) [DOE]

INL is a U.S. Department of Energy National Laboratory INL is a U.S. Department of Energy National Laboratory operated by Battelle Energy Alliance INL/EXT-06-11516 Revision 3 Cyber Security Procurement Language for Control Systems Version 1.8 Sponsor: Department of Homeland Security, National Cyber Security Division Contributors: Idaho National Laboratory, State of New York Multi-State Information Sharing Analysis Center (MSISAC), System Audit Network Security (SANS) February 2008 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any agency thereof, nor any employee, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for any third party's use, or the results of such use, or any

147

CHARACTERIZATION OF A DIGITAL DATA ACQUISITION AND CONTROL SYSTEM FOR PHOTON-COUNTING IMAGING DETECTOR ARRAYS  

E-Print Network [OSTI]

of the newly designed Cold Fanout Board (CFB), full system Bit Error Rate (BER) testing as a function of clock portion of this project. Ultimately, the problem was reduced to an improperly routed clock net on the CFB

Figer, Donald F.

148

Developing attribute acquisition strategies in spoken dialogue systems via user simulation  

E-Print Network [OSTI]

A spoken dialogue system (SDS) is an application that supports conversational interaction with a human to perform some task. SDSs are emerging as an intuitive and efficient means for accessing information. A critical barrier ...

Filisko, Edward A. (Edward Anthony), 1977-

2006-01-01T23:59:59.000Z

149

DIGITAL DATA ACQUISITION SYSTEM FOR TIME OF FLIGHT NEUTRON BEAM MEASUREMENTS  

E-Print Network [OSTI]

the currently available cross section data. The system is designed to work in the energy range of 0.2-20 Me uses The American Nuclear Society's 14th Biennial Topical Meeting of the Radiation Protection and Shielding Division Carlsbad New Mexico, USA. April 3-6, 2006 527 #12;National Instruments Measurement Studio

Danon, Yaron

150

Target area acquisition and control system survivability for the National Ignition Facility  

SciTech Connect (OSTI)

The hardening of instruments to survive NIF target emission environments presents a significant challenge. Neutron flux is predicted to be as much as six orders of magnitude greater than the highest achieved neutron flux on NOVA. Not withstanding the high prompt radiation fields, the specifications for the instruments are demanding; requiring high resolution imaging and sub nanosecond transient measurements. We present an analysis of the sensitivity of the proposed NIF instrumentation design to EMP, X-rays, gamma rays, and neutrons. Major components assessed include fiber optic cable transport, high bandwidth cable and charge coupled detector (CCD) imaging systems.

Hagans, K.; Stathis, P.; Wiedwald, J.; Campbell, D.

1994-06-01T23:59:59.000Z

151

Energy and complex industrial systems environmental emissions data reporting and acquisition  

SciTech Connect (OSTI)

The Joint International Atomic Energy Agency (IAEA), UNEP and WHO Project on Assessing and Managing Health and Environmental risks from Energy and Other Complex Technologies intends to complile emissions data for mportant energy systems and other complex technologies from a wide variety of countries. To facilitate data generation and compilation, this report: outlines data reporting protocols; identifies potential information sources; demonstrates how to estimate coefficients; presents some compiled US emission coefficients or criteria air pollutants for some energy process; and, compares national air emission standards for electricity generating plants in OECD member countries. 27 refs., 2 fis., 1 tabs.

Moskowitz, P.D.; Hamilton, L.D.

1987-07-01T23:59:59.000Z

152

Federal Acquisition Regulation; Federal Acquisition Circular  

Broader source: Energy.gov (indexed) [DOE]

0 0 Federal Acquisition Circular (FAC) 2005-40 Federal Register /Vol. 75, No. 55 /Tuesday, March 23, 2010 /page 14059 A summary for the FAR rule follows. Federal Awardee Performance and Integrity Information System (FAPIIS) (FAR case 2008-027) Effective Date: April 22, 2010. This final rule amends the FAR to implement section 872 of the Duncan Hunter National Defense Authorization Act for Fiscal Year 2009. Section 872 requires the establishment of a data system, Federal Awardee Performance and Integrity Information System (FAPIIS), containing specific information on the integrity and performance of covered Federal agency contractors and grantees. FAPIIS is available for use in award decisions at www.ppirs.gov. Government input to FAPIIS is accomplished at www.cpars.csd.disa.mil.

153

Implementing and Evaluating a Wireless Body Sensor System for Automated Physiological Data Acquisition at Home  

E-Print Network [OSTI]

Advances in embedded devices and wireless sensor networks have resulted in new and inexpensive health care solutions. This paper describes the implementation and the evaluation of a wireless body sensor system that monitors human physiological data at home. Specifically, a waist-mounted triaxial accelerometer unit is used to record human movements. Sampled data are transmitted using an IEEE 802.15.4 wireless transceiver to a data logger unit. The wearable sensor unit is light, small, and consumes low energy, which allows for inexpensive and unobtrusive monitoring during normal daily activities at home. The acceleration measurement tests show that it is possible to classify different human motion through the acceleration reading. The 802.15.4 wireless signal quality is also tested in typical home scenarios. Measurement results show that even with interference from nearby IEEE 802.11 signals and microwave ovens, the data delivery performance is satisfactory and can be improved by selecting an appropriate channe...

Chen, Chao; 10.5121/ijcsit.2010.2303

2010-01-01T23:59:59.000Z

154

Microsoft Word - PNNL-17118 Secure SCADA hadley SSCP FINAL with no ouo.doc  

Broader source: Energy.gov (indexed) [DOE]

8 8 Secure SCADA Communication Protocol Performance Test Results M.D. Hadley K.A. Huston August 2007 Prepared for U.S. Department of Energy Office of Electricity Delivery and Energy Reliability under Contract DE-AC05-76RL01830 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned

155

Acquisition Guide  

Office of Environmental Management (EM)

equipment, facilities and systems; * Communication services; * Architecture-engineering services; * Transportation and related services; * Research and development;...

156

Computer system design description for SY-101 hydrogen mitigation test project data acquisition and control system (DACS-1)  

SciTech Connect (OSTI)

Description of the Proposed Activity/REPORTABLE OCCURRENCE or PIAB: This ECN changes the computer systems design description support document describing the computers system used to control, monitor and archive the processes and outputs associated with the Hydrogen Mitigation Test Pump installed in SY-101. There is no new activity or procedure associated with the updating of this reference document. The updating of this computer system design description maintains an agreed upon documentation program initiated within the test program and carried into operations at time of turnover to maintain configuration control as outlined by design authority practicing guidelines. There are no new credible failure modes associated with the updating of information in a support description document. The failure analysis of each change was reviewed at the time of implementation of the Systems Change Request for all the processes changed. This document simply provides a history of implementation and current system status.

Ermi, A.M.

1997-05-01T23:59:59.000Z

157

Secure control systems with application to cyber-physical systems  

Science Journals Connector (OSTI)

Control systems are computer-based systems with networked units consisting of sensors, actuators, control processing units, and communication devices. The role of control system is to interact, monitor, and control physical processes. Reactive power ... Keywords: SCADA systems, cyber-physical systems, secure control, security

Jin Dong; Seddik. M. Djouadi; James J. Nutaro; Teja Kuruganti

2014-04-01T23:59:59.000Z

158

Policy Flash 2013-30 Acquisition Letter on Acquisition Planning...  

Energy Savers [EERE]

Letter on Acquisition Planning Considerations for Management and Operating Contracts Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management...

159

Acquisition Guide  

Broader source: Energy.gov (indexed) [DOE]

.4 (February 20 10) .4 (February 20 10) Source Evaluation Board (SEB) Secretariat and Knowledge Manager Guiding Principles P Establishment of a SEB Secretariat and Knowledge Management position will improve both the Department's procurement system and its management of knowledge attained by the Department's procurement personnel. REFERENCES Department of Energy (DOE) report on "Report on Reengineering the Business Clearance Process" issued November 2007 National Academy of Public Administration report on "Managing at the Speed of Light - Improving Mission Support Performance" issued July 2009 Government Accountability Office (GAO) report on "Better Performance Measures and Management Needed to Address Delays in Awarding Contracts (GAO-06-722)" issued June

160

Data Acquisition Interpretation  

E-Print Network [OSTI]

Data Acquisition Inversion Interpretation Discussion Virgin River DCIP Report Justin Granek1 1 Report #12;Data Acquisition Inversion Interpretation Discussion Outline 1 Data Acquisition Location Survey Specications 2 Inversion Data Errors DCIP2D DCIP3D 3 Interpretation Correlations Snowbird Tectonic

Oldenburg, Douglas W.

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Measurement enhancement for state estimation  

E-Print Network [OSTI]

, the control center receives the system-wide device information and measurement data through the Supervisory Control and Data Acquisition (SCADA) system. However, the information and measurement data provided by SCADA may not always be accurate and reliable... estimation use the measurement data from SCADA system, the status information about the circuit breakers (CB), switches and transformer taps, as well as the parameters of transmission lines, transformers, shunts capacitors/reactors and other devices...

Chen, Jian

2009-05-15T23:59:59.000Z

162

Acquisition Career Development Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Order establishes training and certification requirements and career development programs under the Acquisition Career Development (ACD) Program for DOE and NNSA acquisition workforce. The acquisition workforce includes contracting, purchasing, personal property management, program management, Contracting Officers and Contracting Officer Representatives. The ACD Program implements the Office of Federal Procurement Policy (OFPP) requirements, Federal Acquisition Regulation (FAR) requirements, Federal Acquisition Reform Act (FARA) requirements, and the objectives of Executive Order (E.O.) 129231, Federal Procurement Reform, dated 10-13-1994. This order cancels DOE O 361.1, Acquisition Career Development Program, dated 11-10-99, AND Acquisition Letter 2003-05, Personal Property Management Career Development, Training, and Certification Program, dated 9-10-03. Cancels DOE O 361.1 Chg 2. Canceled by DOE O 361.1B.

2004-04-19T23:59:59.000Z

163

OPAM Policy Acquisition Guides  

Broader source: Energy.gov (indexed) [DOE]

Chapter 15.4-2 (January 2007) Chapter 15.4-2 (January 2007) 1 Weighted Guidelines [References: FAR 15.4, DEAR 915.4] Overview This section provides guidance for applying the Department's structured approach in determining profit/fee. Background The FAR requires consideration of certain factors (described in 15.404-4 as "profit- analysis factors" or "common factors") in developing a structured profit/fee approach. DOE's structured approach for determining profit/fee objectives is used in those acquisitions when the contracting officer is required to perform a cost analysis. This system provides a comprehensive approach for determining a fair profit or fee. It ensures consistent consideration of the relative value of the factors and provides a basis for

164

Acquisition Career Development Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order implements the Department's Acquisition Career Development program, mandatory for professionals in the GS-1102 and 1105 occupational procurement series, as well as others with significant procurement responsibilities. The Order also ensures that members of the acquisition workforce are aware of and adhere to the mandatory training and certification requirements. Cancels Acquisition Letter 98-06. Canceled by DOE O 361.1 Chg 1.

1999-11-10T23:59:59.000Z

165

Acquisition Career Development Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To set forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Development (ACD) Program, which implements Office of Federal Procurement Policy (OFPP) requirements, Federal Acquisition Regulation (FAR) requirements, Federal Acquisition Reform Act (FARA) requirements, and the career development objectives of Executive Order (E.O.) 12931. Change 1 approved 12-20-2001. Cancels DOE O 361.1. Canceled by DOE O 361.1 Chg 2.

2001-12-20T23:59:59.000Z

166

Acquisition Career Development Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To set forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Development (ACD) Program, which implements Office of Federal Procurement Policy (OFPP) requirements, Federal Acquisition Regulation (FAR) requirements, Federal Acquisition Reform Act (FARA) requirements, and the career development objectives of Executive Order (E.O.) 12931. Change 1 approved 12-20-2001. Change 2 approved 06-13-03. Cancels DOE O 361.1 Chg 1. Canceled by DOE O 361.1A.

2003-06-13T23:59:59.000Z

167

Acquisition Career Management Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order defines requirements and responsibilities for training, certification, and career development programs for the DOE acquisition workforce. Cancels DOE O 361.1A.

2008-01-24T23:59:59.000Z

168

Performance Based Service Acquisition Toolkit | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Procurement and Acquisition Guidance Contracting for Support Services Performance Based Service Acquisition Toolkit Performance Based Service Acquisition Toolkit...

169

Alternative Financing - New Acquisition Guide Subchapter | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Alternative Financing - New Acquisition Guide Subchapter Alternative Financing - New Acquisition Guide Subchapter policy flash Alternative Financing - New Acquisition Guide...

170

A microprocessor-based data acquisition and instrumentation system for the control of a rice-husk furnace  

Science Journals Connector (OSTI)

The development of efficient combustion systems burning solid agricultural wastes for heat and power generation requires well designed microprocessor-controlled systems. This paper describes the development of a cost-effective system to control the stable and clean combustion of rice husks in a vertical cyclone furnace. Such a system is shown to be economically feasible.

Mashkuri Yaacob; Baharuddin Ali

1990-01-01T23:59:59.000Z

171

Policy Flash 20 Acquisition Letter 2014-05/Financial Acquisition...  

Energy Savers [EERE]

Appropriations Committees Subject to Energy and Water Development and Related Agencies Policy Flash 20 Acquisition Letter 2014-05Financial Acquisition Letter 2014-02 Congressional...

172

Acquisition Of Land (Tennessee) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Acquisition Of Land (Tennessee) Acquisition Of Land (Tennessee) Acquisition Of Land (Tennessee) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Tennessee Program Type Siting and Permitting Provider Tennessee Regulatory Authority Every corporation organized under the laws of any state of the United

173

Policy Flash 2013-30 Acquisition Letter on Acquisition Planning  

Broader source: Energy.gov (indexed) [DOE]

0 Acquisition Letter on Acquisition Planning 0 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts Attached is Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor@hq.doe.gov. Policy Flash_MO Acq Planning AL.pdf AL_ 2013-03 Acq Planning_MO.pdf More Documents & Publications Attachment FY2011-09(3) Policy Flash 2013-78 Acquisition Guide Chapter 7.3 Acquisition Planning in

174

OPAM Policy Acquisition Guides  

Broader source: Energy.gov (indexed) [DOE]

17.3 (February 2004) 17.3 (February 2004) Acquisition, Use, and Disposal of Real Estate [Reference: DEAR 917.74, 970.5244-1] Overview This section provides internal Departmental information and a DOE point of contact for issues dealing with real estate acquisition, use, and disposal. Background DEAR 917.74 provides the policy and procedures to be followed in the acquisition, use, and disposal of real estate. In accordance with DEAR clause 970.5244-1, Management and Operating contractors also follow the DEAR 917.74 coverage when they acquire real property. Occasionally in the performance of cost type contracts, the performer will be required to acquire an interest in real estate. Real estate interests include purchases, leases, easements, permits, and licenses. In accordance with the current Secretarial delegation of authority for acquisition,

175

Acquisition and the Environment  

Broader source: Energy.gov [DOE]

The information provide on these pages are meant to be resource and tool for the DOE acquisition community. Please share suggestions for its further development and improvement. Provide your...

176

Acquisition of the Passive  

E-Print Network [OSTI]

This single-subject pilot study, modeled after de Villiers' 1973, investigates the subject's acquisition of the passive construction (i.e., 'The boy was hit by the girl', as opposed to The girl hit the boy'). The purposes ...

Hill, Francine

1998-01-01T23:59:59.000Z

177

Effective Load Management for the City of College Station  

E-Print Network [OSTI]

specifications for a computer controlled system called Supervisory Control and Data Acquisition (SCADA), which will be utilized in automatic system control to achieve maximum pos- sible load reduction during peak load periods. THE TOP TEN COFIIIERCIAL...

Hecox, O. D.; Bauer, V.

1985-01-01T23:59:59.000Z

178

Career Map: Land Acquisition Specialist  

Broader source: Energy.gov [DOE]

The Wind Program's Career Map provides job description information for Land Acquisition Specialist positions.

179

Subsea control and data acquisition  

SciTech Connect (OSTI)

This book contains papers presented at the conference on subsea control and data acquisition. The tasks performed by subsea control systems, although fairly straightforward, are dominated by an alien environment and the high costs associated with failure and repair. The evolution of systems design has resulted in a growing confidence in equipment reliability. In the future, however, more searching demands may include active regulation of valves and the use of data for reservoir management purposes. The emphasis of the papers is on technical depth and understanding, with particular attention being paid to the science control and data monitoring in relation to the task of hydrocarbon recovery.

Not Available

1990-01-01T23:59:59.000Z

180

POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition...  

Broader source: Energy.gov (indexed) [DOE]

23 Acquisition Guide 13.3 Simplified Acquisition Procedures POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition Procedures Questions concerning this policy flash...

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

The Upgrade Path from Legacy VME to VXS Dual Star Connectivity for Large Scale Data Acquisition and Trigger Systems  

SciTech Connect (OSTI)

New instrumentation modules have been designed by Jefferson Lab and to take advantage of the higher performance and elegant backplane connectivity of the VITA 41 VXS standard. These new modules are required to meet the 200KHz trigger rates envisioned for the 12GeV experimental program. Upgrading legacy VME designs to the high speed gigabit serial extensions that VXS offers, comes with significant challenges, including electronic engineering design, plus firmware and software development issues. This paper will detail our system design approach including the critical system requirement stages, and explain the pipeline design techniques and selection criteria for the FPGA that require embedded Gigabit serial transceivers. The entire trigger system is synchronous and operates at 250MHz clock with synchronization signals, and the global trigger signals distributed to each front end readout crate via the second switch slot in the 21 slot, dual star VXS backplane. The readout of the buffered detector signals relies on 2eSST over the standard VME64x path at >200MB/s. We have achieved 20Gb/s transfer rate of trigger information within one VXS crate and will present results using production modules in a two crate test configuration with both VXS crates fully populated. The VXS trigger modules that reside in the front end crates, will be ready for production orders by the end of the 2011 fiscal year. VXS Global trigger modules are in the design stage now, and will be complete to meet the installation schedule for the 12GeV Physics program.

Cuevas, C; Barbosa, F J; Dong, H; Gu, W; Jastrzembski, E; Kaneta, S R; Moffitt, B; Nganga, N; Raydo, B J; Somov, A; Taylor, W M

2011-10-01T23:59:59.000Z

182

FPD + Acquisition Workforce News Acquiring Minds Want to Know  

Broader source: Energy.gov (indexed) [DOE]

FPD + Acquisition Workforce News FPD + Acquisition Workforce News Acquiring Minds Want to Know Office of Acquisition and Project Management OCTOBER 2012 DOE/NNSA Workshop 2 PARS II Reports 3 Recently Certified FPDs 3 PMCDP Schedule 4 Construction Industry Institute 5 Newsletter Name Change 5 PMCDP Curriculum Change 6 FPD Questions of the Month 6 Observations from the Road . . . Management Reserve vs. Contingency Karen Urschel, EVP, Humphreys & Associates The Project Assessment & Reporting System (PARS II)/Earned Value Management Systems (EVMS) Road Show, sponsored by DOE's Office of Acquisition and Project Management (APM), has been visiting our sites across the country. One of the most

183

Multiple-Input Data Acquisition System (MIDAS) for Measuring the Carbon Content in Soil Using Inelastic Neutron Scattering  

SciTech Connect (OSTI)

This report describes work funder under STTR grants Phase I and II and carried out jointly by XIA LLC and Brookhaven National Laboratory (BNL). The project goal was to develop a mobile nuclear activation analysis instrument that could be towed behind a tractor to document soil carbon levels in agricultural lands for carbon credit certification. XIA developed large NaI(Tl) detectors with integrated digital pulse processors controlled over USB 2.0 and delivered 16 of these units to BNL for integration into the prototype instrument, together with the necessary software to calibrate them and collect data. For reasons that are unknown to XIA, the BNL participants never completed the prototype vehicle, performed system integration, or carried out the proposed qualification and field tests, leaving the project incomplete.

Warburton, William K. [XIA LLC

2014-01-24T23:59:59.000Z

184

Aeronautical System Center's environmental compliance assessment and management program's cost-saving initiatives support the Air Force's acquisition reform initiative  

SciTech Connect (OSTI)

The Environmental Management directorate of ASC (ASC/EM) has the responsibility of providing government oversight for the Government Owned Contractor Operated Aircraft and Missile plants (GOCOs). This oversight is manifested as a landlord role where Air Force provides the funding required to maintain the plant facilities including buildings and utilities as well as environmental systems. By agreement the companies operating the plants are required to operate them in accordance with environmental law. Presently the GOCOs include Air Force Plant (AFP) 6 in Marietta Ga., AFP 4 in Fort Worth, Tx., AFP 44 in Tucson, Az., AFP 42 in Palmdale, Ca., and AFP PJKS in Denver, Co. Lockheed Martin corporation operates AFPs 4,6, PJKS and a portion of AFP 42 while AFP 44 is operated by Raytheon Missile Systems Company. Other GOCOs at AFP 42 are Northrup-Grumman, Boeing, and Cabaco, the facilities engineer. Since 1992 the Environmental Management division has conducted its Environmental Compliance Assessment and Management Program assessments (ECAMP) annually at each of the plants. Using DOD's ECAMP Team Guide and teams comprised of both Air Force and consultant engineering personnel, each plant is assessed for its environmental compliance well being. In the face of rising operational costs and diminishing budgets ASC/EM performed a comprehensive review of its ECAMP. As a result, the basic ECAMP program was improved to reduce costs without compromising on quality of the effort. The program retained its emphasis in providing a snap-shot evaluation of each Air Force plant's environmental compliance health supported by complete but tailored protocol assessments.

Meanor, T.

1999-07-01T23:59:59.000Z

185

Acquisition | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Acquisition Acquisition Acquisition In 2009, DOE competitively awarded Ameresco Federal Solutions, Inc. a fixed-price renewable Energy Savings Performance Contract (ESPC) to finance, design, construct, operate, maintain and fuel a new biomass facility at SRS for 20-years. Under ESPCs, private companies finance, install, and maintain new energy and water-efficient equipment in federal facilities, with no up-front funding or extra costs incurred by the government or taxpayers. In 2009, DOE competitively awarded Ameresco Federal Solutions, Inc. a fixed-price renewable Energy Savings Performance Contract (ESPC) to finance, design, construct, operate, maintain and fuel a new biomass facility at SRS for 20-years. Under ESPCs, private companies finance, install, and maintain new energy and water-efficient equipment in federal

186

Acquisition Guide P  

Broader source: Energy.gov (indexed) [DOE]

P P h a p t e r 5.1 (September 2004) Release of Information: Congressional Notification and Long-range Acquisition Estimates [Reference: FAR 5.41 Overview This section discusses the procedures for providing Congressional notice of certain contract and financial assistance actions, and the release of long-range acquisition estimates. Background The Headquarters Office of Congressional and Intergovernmental Affairs notifies members of Congress of DOE activities likely to have an effect on their constituents. These activities include certain contract and financial assistance actions. FAR 5.404-1 identifies the requirements for the release of long-range acquisition planning estimates. Congressional Notification Contracting activities complete and submit form DOE F 4220.10, Congressional GrantIContract

187

Acquisition Strategy RM  

Broader source: Energy.gov (indexed) [DOE]

Acquisition Strategy Review Module Acquisition Strategy Review Module March 2010 CD-0 O 0 OFFICE OF C CD-1 F ENVIRO Standard R Acquisi Rev Critical Decis CD-2 M ONMENTAL Review Plan ition Stra view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) ategy e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets,

188

Environmental Restoration Program project management plan for the DOE Oak Ridge Field Office Major System Acquisition OR-1. Revision 1, Environmental Restoration Program  

SciTech Connect (OSTI)

In the early 1940s, the Manhattan Project was conducted in a regulatory and operational environment less sophisticated than today. Less was known of the measures needed to protect human health and safety and the environment from the dangers posed by radioactive and hazardous wastes, and experience in dealing with these hazardous materials has grown slowly. Certain hazards were recognized and dealt with from the beginning. However, the techniques used, though standard practices at the time, are now known to have been inadequate. Consequently, the DOE has committed to an aggressive program for cleaning up the environment and has initiated an Environmental Restoration Program involving all its field offices. The objective of this program is to ensure that inactive and surplus DOE facilities and sites meet current standards to protect human health and the environment. The objective of these activities is to ensure that risks posed to human health and safety and the environment by inactive sites and surplus facilities contaminated with radioactive, hazardous, and/or mixed wastes are either eliminated or reduced to prescribed safe levels. This Project Management Plan for Major System Acquisition OR-1 Project documents, communicates, and contributes to the evolution of, the management organizations, systems, and tools necessary to carry out effectively the long-range complex cleanup of the DOE sites on the Oak Ridge Reservation, and at the Paducah, Kentucky, and Piketon, Ohio, uranium enrichment plants managed by the Department of Energy Oak Ridge Field Office; the cleanup of off-site contamination resulting from past releases; and the Decontamination and Decommissioning of surplus DOE facilities at these installations.

Not Available

1992-12-01T23:59:59.000Z

189

Federal Acquisition Regulation; Federal Acquisition Circular  

Broader source: Energy.gov (indexed) [DOE]

2005-37; Introduction Federal Acquisition Circular (FAC) 2005-37 List of Rules in FAC 2005-37 Item Subject I. Registry of Disaster Response Contractors II. Limiting Length of Noncompetitive Contracts in "Unusual and Compelling Urgency" Circumstances III. GAO Access to Contractor Employees IV. Use of Commercial Services Item Authority V. Limitations on Pass-Through Charges VI. Award Fee Language Revision VII. National Response Framework VIII. Technical Amendments SUPPLEMENTARY INFORMATION: Summaries for each FAR rule follow. Item I-Registry of Disaster Response Contractors (FAR Case 2008-035) This interim rule amends the FAR at parts 2, 4, 7, 10, 13, 18, 26, and 52 to implement the Registry of Disaster Response Contractors provision, section 697 of the Department of

190

Federal Acquisition Regulation; Federal Acquisition Circular 2005-47; Summary  

Broader source: Energy.gov (indexed) [DOE]

7; Summary 7; Summary This document summarizes the Federal Acquisition Regulation (FAR) rules agreed to by the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) in this Federal Acquisition Circular (FAC) 2005-47. All were effective December 13, 2010 except Items II, HUB Zone, and VI, Pass Through, which will be effective January 12, 2011. List of Rules in FAC 2005-47 Item Subject FAR case Analyst ------------------------------------------------------------------------------------------------------------ ---- I..................................... Notification of Employee 2010-006 McFadden.

191

OPAM Policy Acquisition Guides | Department of Energy  

Energy Savers [EERE]

Policy Acquisition Guides Acquisition Guides OPAM Policy Acquisition Guides More Documents & Publications Weighted Guidelines Weighted Guidelines Microsoft Word - Final MR AL.doc...

192

Notices DEPARTMENT OF DEFENSE Defense Acquisition Regulations  

Broader source: Energy.gov (indexed) [DOE]

2 Federal Register 2 Federal Register / Vol. 78, No. 184 / Monday, September 23, 2013 / Notices DEPARTMENT OF DEFENSE Defense Acquisition Regulations System [Docket No. 2011-0052] Submission for OMB Review; Comment Request ACTION: Notice. The Defense Acquisition Regulations System has submitted to OMB for clearance, the following proposal for collection of information under the provisions of the Paperwork Reduction Act (44 U.S.C. chapter 35). DATES: Consideration will be given to all comments received by October 23, 2013. Title, Associated Form, and OMB Number: Defense Federal Acquisition Regulation Supplement (DFARS), Part 204 and related clause at 252.204-7012, Safeguarding Unclassified Controlled Technical Information. Type of Request: New collection. Number of Respondents: 6,555.

193

ESPC ENABLE ACQUISITION PLAN TEMPLATE  

Broader source: Energy.gov [DOE]

Template serves as a tool to help agencies develop an acquisition plan. The acquisition plan is the first formal step in the Energy Savings Performance Contract (ESPC) ENABLE procurement process. The completed acquisition plan will serve as a guide throughout the rest of the process.

194

Sustainable Acquisition | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Acquisition Acquisition Sustainable Acquisition Mission The team establishes a national approach to expand purchases of environmentally sound goods and services, including biobased products in accordance with Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, and (EO) 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and DOE Order 436.1, Departmental Sustainability, as approved by LM. The team advocates the implementation of a "green" procurement process. Scope The team has established a process to evaluate the procurement of goods and services for LM using the acquisition of environmentally preferable products and services, including the acquisition of biobased, environmentally preferable, energy-efficient, water-efficient, and

195

OPAM Policy Acquisition Guides | Department of Energy  

Energy Savers [EERE]

Acquisition, Use, and Disposal of Real Estate Acquisition, Use, and Disposal of Real Estate Chapter 17 - Special Contracting Methods...

196

CIP Report  

Broader source: Energy.gov (indexed) [DOE]

Featured in this month's issue of The Featured in this month's issue of The CIP Report are Supervisory Control and Data Acquisition (SCADA) systems. SCADA systems monitor and control the processes of many of our Nation's infrastructures. fle security and safety of transportation, water, communications, and many other vital parts of our everyday lives all rely on SCADA systems. In this issue we look at some of the difierent SCADA systems and their applications. fle Thrst article provides an overview of George Mason University's research on SCADA systems. flis research focuses on railroad transportation and Positive Train Control systems. fle second article discusses the Energy Sector's response to cyber threats and the efiorts to secure their control systems. An article from Mississippi State

197

Acquisition Letters Archives | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Acquisition Letters Archives Acquisition Letters Archives Acquisition Letters Archives 95-06, 06/28/95, Personal Property Letter System 95-14, 11/17/95, PDF, Subcontracts Under the New Independent States Program 96-09, 9/16/96, PDF, Full and Open Competition - Management & Operating Contracts 98-11, 9/18/98, PDF, Waiver of Synopsis Requirements 99-04, 6/23/99, PDF, Consortium Buying 99-06, 8/27/99, PDF, DOE Authorized Subcontract for Use by DOE M&O Contractors with New Independent States Scientific Institutes Through the International Science & Technology Center Attachment to AL 99-06 Model Subcontract 2000-05, 5/17/2000, PDF, DOE Authorized Subcontract for Use by DOE M&O Management and Operating (M&O) Contractors with New Independent States' Scientific Institutes through Science and Technology in Ukraine

198

Federal Acquisition Regulations Federal Acquisition Circular 2005-51 Summary  

Broader source: Energy.gov (indexed) [DOE]

Regulations Regulations Federal Acquisition Circular 2005-51 Summary Federal Register April 1, 2011 76FR 18304 I Women-Owned Small Business (WOSB) Program (Interim Rule). II Clarification of Standard Form 26--Award/Contract. Item I--Women-Owned Small Business (WOSB) Program (FAR Case 2010-015) (Interim) This interim rule amends the FAR to add subpart 19.15, Women-Owned Small Business Program, which will assist Federal agencies in achieving the 5 percent statutory goal for contracting with women-owned small business (WOSB) concerns. Agencies may restrict competition to economically disadvantaged women-owned small business (EDWOSB) concerns for contracts assigned a North American Industry Classification Systems (NAICS) code in an industry in which the Small Business Administration has

199

1836 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 23, NO. 4, NOVEMBER 2008 Vulnerability Assessment of Cybersecurity  

E-Print Network [OSTI]

of Cybersecurity for SCADA Systems Chee-Wooi Ten, Student Member, IEEE, Chen-Ching Liu, Fellow, IEEE's cybersecurity standards for electric power systems. The purpose is to study the impact of a cyber attack within the substation networks. Countermeasures are identified for improvement of the cybersecurity

Manimaran, Govindarasu

200

THE LHC EXPERIMENT CONTROL SYSTEM: ON THE PATH TO FULL AUTOMATION  

E-Print Network [OSTI]

THE LHC EXPERIMENT CONTROL SYSTEM: ON THE PATH TO FULL AUTOMATION C. Gaspar, F. Alessio, L. Cardoso, Rutherford Appleton Laboratory, Chilton, Didcot, OX11 0QX, UK Abstract LHCb is a large experiment at the LHC are based on the PVSS SCADA System complemented by a control Framework developed in common for the 4 LHC

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Hallmark Project  

Broader source: Energy.gov (indexed) [DOE]

Project Project Commercialization of the Secure SCADA Communications Protocol, a cryptographic security solution for device-to-device communication Increased connectivity and automation in the control systems that manage the nation's energy infrastructure have improved system functionality, but left systems more vulnerable to cyber attack. Intruders could severely disrupt control system operation by sending fabricated information or commands to control system devices. To ensure message integrity, supervisory control and data acquisition (SCADA) systems require a method to validate device-to- device communication and verify that information has come from a trusted source and not been altered in transit. The Secure SCADA Communications Protocol (SSCP) provides message

202

MEMORANDUM FOR CHIEF ACQUISITION OFFICERS  

Broader source: Energy.gov (indexed) [DOE]

November 28, 2007 November 28, 2007 MEMORANDUM FOR CHIEF ACQUISITION OFFICERS SENIOR PROCUREMENT EXECUTIVES FROM: Paul A. Denett Administrator SUBJECT: Appropriate Use of Brand Name or Equal Purchase Descriptions The Office of Management and Budget (OMB) issued policy memorandums in April 2005 and April 2006, implementing brand name posting requirements for acquisitions (including simplified acquisitions and sole source procurements) over $25,000. The Federal Acquisition Regulation (FAR) was revised in September 2006 to incorporate this new policy. However, we are concerned that agencies are not preparing and posting the brand name justification or documentation in accordance with the new FAR requirements. Complaints have also been

203

Acquisition Guide | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Samples - forms and other useful documentation. The Guide is intended to serve as a primer on various acquisition issues, and may not present lengthy discussion on every...

204

MEMORANDUM FOR CHIEF ACQUISITION OFFICERS  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

is critical for agency program managers as they define requirements and for contracting officers as they develop acquisition strategies, seek opportunities for small...

205

Sustaninable Acquisition | Department of Energy  

Office of Environmental Management (EM)

Acquisition Federal agencies are required to give preference to products that are energy efficient, water efficient, made from biobased or recycled content, are non-toxic...

206

Computer Systems to Oil Pipeline Transporting  

E-Print Network [OSTI]

Computer systems in the pipeline oil transporting that the greatest amount of data can be gathered, analyzed and acted upon in the shortest amount of time. Most operators now have some form of computer based monitoring system employing either commercially available or custom developed software to run the system. This paper presented the SCADA systems to oil pipeline in concordance to the Romanian environmental reglementations.

Chis, Timur

2009-01-01T23:59:59.000Z

207

DOE FPD + Acquisition Workforce News Acquiring Minds Want to Know  

Broader source: Energy.gov (indexed) [DOE]

APRIL 2013 APRIL 2013 CO - FPD Simpatico 2 CHRIS and FAITAS 4 Acquisition Certifications at a Glance 5 RU Aware Your SACM is There? 6 Facilities Information Management System 6 FY 2012 Excess Elimination and Banking Report 7 Inaugural Property Management Workshop 9 Coming Soon To Better Serve You 10 What do we mean when we say Acquisition Workforce? David Boyd, Deputy Director APM Linda Ott, Chief of Professional Development Division (MA-661), APM That's a question we've been asking around APM a lot. Before we can explain the acquisition workforce (AWF), we need to make sure we understand what we mean when we say acquisition. As defined in the Federal Acquisition Regulations (FAR),

208

Acquisition Resources | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Acquisition » Acquisition Acquisition » Acquisition Resources Acquisition Resources Doing Business with DOE/EM Doing Business with DOE/EM EM Procurement Offices Doing Business with EM Consolidated Business Center Guide for Submission of Unsolicated Proposals Federal Business Opportunities Small Business Opportunities EM Major Procurements as of 10/01/13 EM Utility Contracts EM Partnering Initiative: Journey to Excellence Metric No. 3.5 Project Management Resources DOE Office of Environmental Management Project & Contract Management Improvement Timeline Project Management Approach Using Earned Value Management Root Cause Analysis and Corrective Actions Plan DOE Order 413.3B DOE Directives OMB Capital Programming Guide OECM Project Management Career Development Program OECM Project Management Policy and Guidance per Office of Management

209

Chapter 13 - Simplified Acquisition Procedures | Department of...  

Broader source: Energy.gov (indexed) [DOE]

13 - Simplified Acquisition Procedures Chapter 13 - Simplified Acquisition Procedures 13.1 - Purchase Card Policy and Operating Procedures 13.2PurchaseOrders0.pdf More Documents...

210

Solar Acquisition Corp | Open Energy Information  

Open Energy Info (EERE)

Acquisition Corp Jump to: navigation, search Name: Solar Acquisition Corp Place: Ann Arbor, Michigan Product: Michigan-based holding company in the process of acquiring a portfolio...

211

OPAM Policy Acquisition Guides | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

17 - Special Contracting Methods Acquisition Letter 2009-03 Acquisition Planning-Extending A Management and Operating Contract Without Full and Open Competition and Site and...

212

Memorandum for Chief Acquisition Officers, Senior Procurement...  

Office of Environmental Management (EM)

in the acquisition lifecycle and a model interagency agreement to reinforce sound contracting and fiscal practices. The guidance reflects comments provided by Chief Acquisition...

213

E-Print Network 3.0 - acquisition amc module Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Coordination for Accelerator Research and Development Summary: . The ATCA-based LLRF control system requires the following AMC devices: 8-channel data acquisition module......

214

E-Print Network 3.0 - acquisition process nssap Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

process architectures S. James Choi a,1 , Walt Scacchi... eorts to support the modeling and simulation of processes associated with software system acquisition... rst...

215

POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non...  

Broader source: Energy.gov (indexed) [DOE]

Contractor Business Systems Clauses for Section H - Earned Value Management Clause POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non-Management and Operating...

216

E-Print Network 3.0 - acquisition facilitates 3d Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Centre de mathmatiques Collection: Mathematics 6 Integration of high-resolution spatial and spectral data acquisition systems to provide complementary datasets for...

217

The evolution of the Weapon System Reform Act of 2009 (Public Law 111-23) .  

E-Print Network [OSTI]

??In evaluating the implications of the Weapon System Acquisition Reform Act of 2009 (WSARA), we compare the position of prior acquisition acts and DoD acquisition (more)

McWhorter, Michael

2011-01-01T23:59:59.000Z

218

Acquisition Letters | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Acquisition Letters Acquisition Letters Acquisition Letters The following is a list of active Department of Energy Acquisition Letters. These files are in PDF (Portable Document Files), MS Excel, or htm (hypertext markup) format. To read PDF files you must have Adobe Acrobat Reader which is available at no charge from Adobe (http://www.adobe.com/). If you have any questions concerning this list, please contact the Office of Procurement and Assistance Policy on (202) 287-1330. NOTE: Copies of rescinded or cancelled AL's are available by calling the Office of Procurement and Assistance Policy at (202) 287-1330. ASSISTANCE ON USING THESE FILES: You may: (1) download these files to your local machine by clicking on the file name and choosing SAVE TO DISK, OR (2) you can configure Adobe Acrobat Reader to automatically open, which

219

Customer Acquisition | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

child looking at a silver box on the outside of a home. Customer acquisition costs in the solar energy industry include marketing efforts to reach potential customers and salary...

220

Supercritical water oxidation data acquisition testing. Final report, Volume I  

SciTech Connect (OSTI)

This report discusses the phase one testing of a data acquisition system for a supercritical water waste oxidation system. The system is designed to destroy a wide range of organic materials in mixed wastes. The design and testing of the MODAR Oxidizer is discussed. An analysis of the optimized runs is included.

NONE

1996-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Data Acquisition-Manipulation At Central Nevada Seismic Zone Region  

Open Energy Info (EERE)

Data Acquisition-Manipulation At Central Nevada Seismic Zone Region Data Acquisition-Manipulation At Central Nevada Seismic Zone Region (Blackwell, Et Al., 2003) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Central Nevada Seismic Zone Region (Blackwell, Et Al., 2003) Exploration Activity Details Location Central Nevada Seismic Zone Geothermal Region Exploration Technique Data Acquisition-Manipulation Activity Date Usefulness useful DOE-funding Unknown Notes Determining heat loss is one more tool to use in geothermal exploration. It is relatively easy to calculate if the thermal aureole has been mapped with thermal gradient well measurements. With the heat loss information, predicted production capacity can be used to help review the system being explored.

222

LOCOMOTIVE DATA ACQUISITION PACKAGE  

E-Print Network [OSTI]

application) by metal coil springs. If the same spring rateconfigurations (coil springs and the like). Nevertheless, iffrequency system, metal coil springs are being considered

Abbott, Robert K.

2011-01-01T23:59:59.000Z

223

Acquisition Savings Reporting Process Template  

Broader source: Energy.gov (indexed) [DOE]

Savings Reporting Process Savings Reporting Process Reporting Template 083112 FINAL 1 of 7 As of August 28, 2012 ` Process 1 STEP 1 - Select Savings Type You must first determine if the savings is through a Strategic Sourcing process or an Other Acquisition Savings process. If it is Strategic Sourcing, it must satisfy the 8 step definition. If it does not satisfy the eight steps, then it is an Other Acquisition Savings process. 2 STEP 2 - Select Savings Methodology (In Order of Preference) Regardless if it is Strategic Sourcing or an Other Acquisition Savings process, the next step is to determine the savings methodology that will be used to calculate the savings. You must select only one methodology. a. Transactions are not reported as savings in multiple categories.

224

Acquisition News | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Acquisition News Acquisition News Acquisition News RSS July 12, 2013 Contract Awarded for Environmental Technical Services Cincinnati - The U.S. Department of Energy (DOE) awarded a contract for Environmental Technical Services to Restoration Services Inc. of Oak Ridge, Tennessee, for support services at the Portsmouth Gaseous Diffusion Plant located near Piketon, OH. March 7, 2013 Department of Justice: CH2M Hill Hanford Group Inc. Admits Criminal Conduct, Parent Company Agrees to Cooperate in Ongoing Investigation and Pay $18.5 Million to Resolve Civil and Criminal Allegations The Justice Department, in conjunction with the U.S. Attorney's Office for the Eastern District of Washington, announced today that Colorado-based CH2M Hill Hanford Group Inc. (CHG) and its parent company, CH2M Hill

225

Acquisition News | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Acquisition News Acquisition News Acquisition News RSS April 29, 2011 DOE Awards Contract for Decontamination & Decommissioning Project for the East Tennessee Technology Park Oak Ridge, Tenn. - As part of its ongoing commitment to cleaning up the legacy of the Cold War at sites across the weapons complex, the U.S. Department of Energy has awarded a contract for the remaining environmental cleanup at the East Tennessee Technology Park (ETTP) to URS | CH2M Oak Ridge, LLC. previous 1 2 next Waste Management Nuclear Materials & Waste Tank Waste and Waste Processing Waste Disposition Packaging and Transportation Site & Facility Restoration Deactivation & Decommissioning (D&D) Facility Engineering Soil & Groundwater Sustainability Program Management Safety Security Quality Assurance

226

Acquisition Plan Strategy and Guidance  

Broader source: Energy.gov (indexed) [DOE]

3 3 01 ACQUISITION PLAN STRATEGY AND GUIDANCE NOTE: The process provided below is not intended to replace an agency's acquisition planning requirements. INSTRUCTIONS 1. Work with your DOE Federal Finance Specialist to determine whether a "pay from savings" project is feasible. a. Determine if appropriated dollars are available to offset some of the costs. b. Consider alternative finance options: Energy Savings Performance Contract (ESPC), Utility Energy Service Contract (UESC), Power Purchase Agreement (PPA), or Enhanced Use Lease (EUL) Scott Wolf 6848 Cooper Point Road NW Olympia, WA 98502 Phone: 360-866-9163 Fax: 360-866-9683 scott.wolf@ee.doe.gov Serving Montana, Wyoming, Utah, Colorado, Nebraska, New Mexico,

227

Acquisition Workforce Information | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Certifications and Professional Certifications and Professional Development » Acquisition Workforce Information Acquisition Workforce Information The Department of Energy (DOE) Acquisition Workforce consists of a broad range of professional and technical personnel including: Contract Specialists/Contracting Officers, Contracting Officer's Technical Representatives, Financial Assistance Personnel, Technical Project Officers, Personal Property Managers, Real Estate Contracting Officers, Federal Project Directors/Program Managers, as well as personnel who perform acquisition-related activities and functions within DOE. DOE's goal is to continue to develop and maintain a highly professional, well-trained Acquisition Workforce. DOE requires Acquisition Workforce members to meet a variety of Federal and DOE established certifications

228

A Low-Cost Continuous Emissions Monitoring System for Mobile and Stationary Engine SCR/DPF Applications/Data-Logger for Vehicle Data Acquisition  

Broader source: Energy.gov [DOE]

This project describes a novel system of sensors that continuously monitor emissions in real time and a data logger to gather real-time data from a vehicle

229

December 200 Copper Acquisition by  

E-Print Network [OSTI]

December 200 Copper Acquisition by Methanotrophic Bacteria 7 Term Paper HS2007 Major. One is soluble in the cytoplasm and the other is bound to the membrane. Since the expression of copper containing pMMO depends on copper availability it is supposed that some methanotrophs have developed

Fischlin, Andreas

230

Test Acquisition Guide | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Test Acquisition Guide Test Acquisition Guide Test Acquisition Guide Regulatory requirements for the acquisition process are set forth in the Federal Acquisition Regulation (FAR) and are supplemented in the Department of Energy Acquisition Regulation (DEAR). FAR 1.301 provides for the issuance of additional internal agency guidance, including designations and delegations of authority, assignments of responsibilities, work-flow procedures, and internal reporting requirements. The DOE Acquisition Guide serves this purpose by identifying relevant internal standard operating procedures to be followed by both procurement and program personnel who are involved in various aspects of the acquisition process. The Guide also is intended to be a repository of best practices found throughout the agency

231

Miscellaneous States Shale Gas Proved Reserves Acquisitions ...  

U.S. Energy Information Administration (EIA) Indexed Site

Acquisitions (Billion Cubic Feet) Miscellaneous States Shale Gas Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

232

Wyoming Coalbed Methane Proved Reserves Acquisitions (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Acquisitions (Billion Cubic Feet) Wyoming Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

233

Arkansas Coalbed Methane Proved Reserves Acquisitions (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Acquisitions (Billion Cubic Feet) Arkansas Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

234

Colorado Coalbed Methane Proved Reserves Acquisitions (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Acquisitions (Billion Cubic Feet) Colorado Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

235

Oklahoma Coalbed Methane Proved Reserves Acquisitions (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Acquisitions (Billion Cubic Feet) Oklahoma Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

236

Acquisition of Scientific Equipment  

SciTech Connect (OSTI)

Whitworth University constructed a 63,00 sq. ft. biology and chemistry building which opened in the Fall of 2011. This project provided for new state-of-the-art science instrumentation enabling Whitworth students to develop skills and knowledge that are directly transferable to practical applications thus enhancing Whitworth student's ability to compete and perform in the scientific workforce. Additionally, STEM faculty undertake outreach programs in the area schools, bringing students to our campus to engage in activities with our science students. The ability to work with insturmentation that is current helps to make science exciting for middle school and high school students and gets them thinking about careers in science. 14 items were purchased following the university's purchasing policy, that benefit instruction and research in the departments of biology, chemistry, and health sciences. They are: Cadaver Dissection Tables with Exhaust Chamber and accessories, Research Microscope with DF DIC, Phase and Fluorescence illumination with DP72 Camera, Microscope with Fluorescence, Microcomputer controlled ultracentrifuge, Ultracentrifuge rotor, Variable Temperature steam pressure sterilizer, Alliance APLC System, DNA Speedvac, Gel Cocumentation System, BioPac MP150, Glovebox personal workstation,Lyophilizer, Nano Drop 2000/2000c Spectrophotometer, C02 Incubator.

Noland, Lynn [Director, Sponsored Programs] [Director, Sponsored Programs

2014-05-16T23:59:59.000Z

237

Acquisition and Project Management | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

Contractor Human Resources Performance Evaluations Acquisition Management Technical, Engineering, and Programmatic Support (TEPS) Blanket Purchase Agreements (BPAs)...

238

Acquisition and Project Management Continuous Improvement Presentation...  

Office of Environmental Management (EM)

Occupational Safety Performance Voluntary Protection Program Onsite Review, Safeguards and Security - August 2012 Report on Acquisition and Project Management Continuous...

239

ESPC Acquisition Plan Strategy and Guidance  

Broader source: Energy.gov [DOE]

Document features a recommended process for developing an acquisition plan within a Federal energy savings performance contract (ESPC).

240

OPAM Policy Acquisition Guides  

Broader source: Energy.gov (indexed) [DOE]

October 2006) October 2006) 1 Contingency Contracting Authorities: 42 U.S.C. 5150, Robert T. Stafford Disaster Relief and Emergency Assistance Act, P.L. 93-288 as amended Preference shall be given to those organizations, firms, or individuals residing or doing business in the area affected for the purpose of debris clearance, distribution of supplies, reconstruction, and other major disaster or emergency assistance activities. Defense Priorities and Allocation System Program (DPAS) Title I of the Defense Production Act of 1950, as amended, authorizes the President to require preferential acceptance and performance of contracts or orders supporting certain approved national defense and energy programs, and to allocate materials (including equipment), services, and facilities in such a manner as to promote these

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

High resolution data acquisition  

DOE Patents [OSTI]

A high resolution event interval timing system measures short time intervals such as occur in high energy physics or laser ranging. Timing is provided from a clock (38) pulse train (37) and analog circuitry (44) for generating a triangular wave (46) synchronously with the pulse train (37). The triangular wave (46) has an amplitude and slope functionally related to the time elapsed during each clock pulse in the train. A converter (18, 32) forms a first digital value of the amplitude and slope of the triangle wave at the start of the event interval and a second digital value of the amplitude and slope of the triangle wave at the end of the event interval. A counter (26) counts the clock pulse train (37) during the interval to form a gross event interval time. A computer (52) then combines the gross event interval time and the first and second digital values to output a high resolution value for the event interval.

Thornton, Glenn W. (Los Alamos, NM); Fuller, Kenneth R. (Los Alamos, NM)

1993-01-01T23:59:59.000Z

242

High resolution data acquisition  

DOE Patents [OSTI]

A high resolution event interval timing system measures short time intervals such as occur in high energy physics or laser ranging. Timing is provided from a clock, pulse train, and analog circuitry for generating a triangular wave synchronously with the pulse train (as seen in diagram on patent). The triangular wave has an amplitude and slope functionally related to the time elapsed during each clock pulse in the train. A converter forms a first digital value of the amplitude and slope of the triangle wave at the start of the event interval and a second digital value of the amplitude and slope of the triangle wave at the end of the event interval. A counter counts the clock pulse train during the interval to form a gross event interval time. A computer then combines the gross event interval time and the first and second digital values to output a high resolution value for the event interval.

Thornton, G.W.; Fuller, K.R.

1993-04-06T23:59:59.000Z

243

Federal Acquisition Regulation Federal Acquisition Circular 2005-62 Summary of Rules  

Broader source: Energy.gov (indexed) [DOE]

2 Summary of Rules 2 Summary of Rules Item Subject FAR Case I. Updates to Contract Reporting and Central 2010-014 Contractor Registration II. Interagency Acquisitions: Compliance by Nondefense 2012-010 Agencies with Defense Procurement Requirements. III. Free Trade Agreement-Panama 2012-027 Item I-- Updates to Contract Reporting and Central Contractor Registration (FAR Case 2010-014) This final rule amends the FAR to limit the use of generic substitutes instead of Data Universal Numbering System (DUNS) numbers, and update the policies and procedures associated with reporting in the Federal Procurement Data System (FPDS). Additionally, this final rule changes the clauses requiring contractor registration in the Central Contractor

244

Defense acquisition program manager as program leader : improving program outcomes through key competencies and relationship management  

E-Print Network [OSTI]

The US defense acquisition system is a massive enterprise charged with developing and acquiring state-of-the-art military technology and systems. For the past 65 years, many broad-reaching studies and commissions have ...

Baumann, B. Marc

2013-01-01T23:59:59.000Z

245

AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT | Department...  

Broader source: Energy.gov (indexed) [DOE]

AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT Acquisition Letters (AL)...

246

Re-Architecting the DoD Acquisition Process: A Transition to the Information Age  

E-Print Network [OSTI]

and Management Program #12;2 Re-Architecting the DoD Acquisition Process: A Transition to the Information Age1 Re-Architecting the DoD Acquisition Process: A Transition to the Information Age by Kevin M Masters of Science, Engineering Management University of Missouri, Rolla, MO Submitted to the System

de Weck, Olivier L.

247

EOTA Support Services Contract Acquisition  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Emergency Operations Training Academy (EOTA) Support Services Contract Emergency Operations Training Academy (EOTA) Support Services Contract Acquisition Welcome to the EOTA Support Services Contract Acquisition page. The U.S. Department of Energy National Nuclear Security Administration, EOTA requires support services to implement a comprehensive professional training development program to NNSA HQs and site office personnel. EOTA's training center located in Albuquerque, NM develop, coordinates, delivers, and certifies related emergency operations/management training at other NNSA site Offices located through out the country. EOTA ensures the effective and efficient training of emergency operations personnel throughout the DOE who are or may become involved in the planning, preparedness, and response of vital national resources. The EOTA provides

248

Acquisition Guide Chapter 42.5  

Broader source: Energy.gov (indexed) [DOE]

Chapter 42.5 Chapter 42.5 (February 2012) 1 CONTRACT MANAGEMENT PLANNING Applicability: This section is applicable to the contracting activities of the Department of Energy (DOE). References:  FAR 46.4, "Government Contract Quality Assurance"  FAR 42, Contract Administration and Auditing Services  FAR 43, Contract Modifications  DEAR 970.1100-1, "Performance-based Contracting"  DOE Acquisition Guide, Chapter 7.1, "Acquisition Planning"  DOE Acquisition Guide, Chapter 37, "Service Contracting"  DOE Acquisition Guide Chapter 43.2, "Change Order Template"  DOE O 413.3B, "Program and Project Management for the Acquisition of Capital Assets"

249

Flexible Knowledge Acquisition Through Explicit Representation of Knowledge Roles  

E-Print Network [OSTI]

Flexible Knowledge Acquisition Through Explicit Representation of Knowledge Roles Bill Swartout@isi.edu, gil@isi.edu Abstract A system that acquires knowledge from a user should be able to reflect upon the knowledge that it has--at each moment--and understand what kinds of new knowledge it needs to learn

Southern California, University of

250

Data acquisition as a design parameter in the modern AEM  

SciTech Connect (OSTI)

The components of a modern analytical electron microscope (AEM) are not necessarily optimized. A pessimistic view is presented of an AEM system, particularly on the data acquisition end. The question of how to design the instrument to collect the data efficiently, is considered. Several points for doing this are outlined.

Zaluzec, N.J.

1993-04-01T23:59:59.000Z

251

Automated control and data acquisition for a small dilution refrigerator  

Science Journals Connector (OSTI)

An automatic temperature controller and data acquisition system for use with a dilution refrigerator is described. The unit is controlled by a 16?bit home microcomputer and operates and reads a resistance bridge capacitance bridge and temperature controller. Interfacing is achieved with common components and minimum additional wiring. Flexibility is retained in the software to allow application to several types of measurements.

David G. Haase

1981-01-01T23:59:59.000Z

252

Robust Policies for the Transformer Acquisition and Allocation Problem  

E-Print Network [OSTI]

Robust Policies for the Transformer Acquisition and Allocation Problem Johannes Enders Department and allocation of high-voltage transformers over time. We analyze PJM's transmission system by simulating associated with transformer failures and replacements. #12;1 Introduction The replacement of the high

Powell, Warren B.

253

acquisition  

National Nuclear Security Administration (NNSA)

0%2A en Small Business http:nnsa.energy.govaboutusouroperationsapmsmallbusiness

Page...

254

Acquisition Career Management Program Manual Interim Guidance  

Broader source: Energy.gov (indexed) [DOE]

Management Program Manual Management Program Manual Interim Guidance Partial Revision Chapter 11 Contracting Officers Representatives (COR) Contracting Officers Representatives Background FAI published a report in 2003 on the competencies necessary for the COR job function and the US Merit Systems Protection Board published a report in 2005 entitled "Contracting Officer Representatives: Managing the Government's Technical Experts to Achieve Positive Contract Outcomes." Both reports are available at www.fai.gov. A common theme in these reports is the need to organize and support the COR community to ensure that acquisition management is implemented effectively. Some of the findings and recommendations of the reports are: * CORs must be formally delegated authority to work on particular contracts

255

Report: Acquisition, Project Management, and Quality Assurance  

Broader source: Energy.gov (indexed) [DOE]

Acquisition, Project Management, and Quality Assurance Acquisition, Project Management, and Quality Assurance September 30, 2009 Submitted by the EMAB Acquisition and Project Management Subcommittee Background For FY 2009 EMAB was tasked to review the management and delivery of EM's Construction Projects and confirm whether or not the program is headed in the right direction or needs to make some adjustments in order to improve efficiency. EMAB reviewed and discussed the topics of Acquisition and Project Management during its public meetings. The Acquisition and Project Management subcommittee, comprised of Mr. G. Brian Estes, Dr. Lawrence Papay, and Mr. David Swindle, engaged in teleconferences on August 7 and September 4 with EM senior personnel. Findings and Observations Deputy Assistant Secretary Jack Surash provided an update on EM acquisition initiatives, and he

256

The Drinking Water Security and Safety Amendments of 2002: Is America's Drinking Water Infrastructure Safer Four Years Later?  

E-Print Network [OSTI]

While some believe that hacking into a SCADA system "of SCADA systems by hacking into a computerized wastefor such things as ". . .hacking into computers, chemical

Shermer, Steven D.

2006-01-01T23:59:59.000Z

257

Planning, Budget, and Acquisition | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Planning, Budget, and Acquisition Planning, Budget, and Acquisition Planning, Budget, and Acquisition The Office of Legacy Management's (LM) Planning, Budget, and Acquisition (PBA) Team performs the following management functions: Plans, develops, and implements improvements in efficiencies of business processes and identifies opportunities for reengineering or restructuring. Plans, develops, and implements strategic planning efforts, which include analyzing the organization's annual and long-term goals and the best approach for achieving those goals. Plans, develops, and implements budget formulation processes to include identifying future spending priorities and assessing the effectiveness of programs. Plans, develops, and implements processes for budget execution, including day-to-day obligations for agency expenditures, invoices, billing

258

SPR Acquisition Procedures - Final Rulemaking | Department of...  

Office of Environmental Management (EM)

Point of Contact: Nathan Harvey, Director of Operatons and Readiness, Strategic Petroleum Reserve, (202) 586-4691 SPR Crude Oil Acquisition Procedures - Final Rulemaking More...

259

Policy Flash 2013-39 Acquisition Guide, Chapter 42.15, Contractor  

Broader source: Energy.gov (indexed) [DOE]

9 Acquisition Guide, Chapter 42.15, Contractor 9 Acquisition Guide, Chapter 42.15, Contractor Performance Information Policy Flash 2013-39 Acquisition Guide, Chapter 42.15, Contractor Performance Information Attached is Policy Flash 2013-39 Acquisition Guide, Chapter 42.15, Contractor Performance Information Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project Management Policy at (202) 287-1340 or at Barbara.Binney@hq.doe.gov. Policy Flash AG chapter 4215.pdf AcqGuide42pt15 March 2013.pdf AcqGuide42pt15 attachment March 2013 ratings and narratives.pdf More Documents & Publications Policy Flash 2013-70 Acqusition Guides 42.15 Contractor Performance Infromation and 42.16 reporting Other Contractor Performance into Federal Awardee Performance and Integrity Infromation Systems (FAPIIS)

260

Federal Acquisition Regulation Federal Acquisition Circular 2005-61  

Broader source: Energy.gov (indexed) [DOE]

1 1 Summary of Rules in FAC 2005-61 Item Subject FAR Case I. United States--Korea Free Trade Agreement. 2012-004 II. Delete Outdated FAR Reference to the 2012-026 DoD Industrial Preparedness Program. III. NAICS and Size Standards 2012-021 IV. Bid Protest and Appeal Authorities. 2012-008 V. Technical Amendments. Item I--United States-Korea Free Trade Agreement (FAR Case 2012-004) This final rule adopts without change the interim rule published in the Federal Register on March 7, 2012 (77 FR 13952), to implement the United States-Korea Free Trade Agreement. The Republic of Korea is already party to the World Trade Organization Government Procurement Agreement (WTO GPA). The Korea Free Trade Agreement now covers acquisition of supplies and services between $100,000 and the current WTO GPA threshold of

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non...  

Energy Savers [EERE]

Business Systems Clauses for Section H - Earned Value Management Clause POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non-Management and Operating (Non-M&O)...

262

Knowledge acquisition, consistency checking and concurrency control for Gene Ontology (GO)  

Science Journals Connector (OSTI)

......University Press 2003 Original Paper Knowledge acquisition, consistency checking and...for communicating biological data and knowledge. The Gene Ontology (GO; http...paper, we assess the applicability of a Knowledge Base Management System (KBMS), Protege-2000......

Iwei Yeh; Peter D. Karp; Natalya F. Noy; Russ B. Altman

2003-01-01T23:59:59.000Z

263

Aspects of Apache's Acquisition of Mariner Energy and Selected Devon Energy Assets  

Reports and Publications (EIA)

The Energy Information Administration reviews mergers, acquisitions, and alliances by companies that are respondents to Form EIA-28 (Financial Reporting System (FRS)), or that result in a company that meets the FRS reporting criteria.

2010-01-01T23:59:59.000Z

264

Acquisition, Use, and Disposal of Real Estate  

Broader source: Energy.gov (indexed) [DOE]

Chapter 17.3 (March 2011) Chapter 17.3 (March 2011) 1 Acquisition, Use, and Disposal of Real Estate References DEAR 917.74 - Acquisition, Use, and Disposal of Real Estate DOE Directives DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets, or current version DOE Order 430.1B, Real Property Asset Management, or current version Overview This section provides internal Departmental information and DOE and NNSA points of contact for issues dealing with real estate acquisition, use, and disposal for cost reimbursement and fixed price contracts when in performance of the contract, the contractor will acquire or proposes to acquire use of real property. Background DEAR Subpart 917.74 - Acquisition, Use, and Disposal of Real Estate provides the policy and

265

Report: Small Business, Acquisition, and Project Management  

Broader source: Energy.gov (indexed) [DOE]

SMALL BUSINESS, ACQUISITION, AND PROJECT MANAGEMENT SMALL BUSINESS, ACQUISITION, AND PROJECT MANAGEMENT Background In FY 2007 EMAB was tasked to dialogue with the Office of Acquisition and Project Management (EM-50) on the topic of Small Business and provide advice and recommendations drawn from EMAB members' experience in commercial industry. Additionally, EMAB continued to review and discuss the topics of Acquisition and Project Management during its public meetings and in exchanges with EM senior personnel. Discussion In FY 2006, EM's small business prime contract goal of $208 million was exceeded by well over $100 million. The FY 2007 goal was $198 million, and once again, the program was poised to exceed that mark. Statistically, EM's execution of its small business acquisition strategy is commendable; however, EMAB has a number of

266

Acquisition Strategy RM | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Acquisition Strategy RM Acquisition Strategy RM Acquisition Strategy RM The Acquisition Strategy (AS) Review Module (RM) is a tool that assists Department of Energy (DOE) federal project review teams in evaluating the adequacy of the AS prior to approval of CD-1. The key elements and Lines of Inquiry's (LOIs) identified in this Module were specifically developed to be generic in nature to ensure that they were applicable to as many DOE projects as possible. Therefore, it is essential that the review team use these key elements and LOIs only as a starting point, and that more detailed project specific elements and LOIs be developed to ensure that the project is adequately evaluated. Acquisition Strategy RM More Documents & Publications Conceptual Safety Design RM Checkout, Testing, and Commissioning Plan RM

267

Acquisition Strategy RM | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Acquisition Strategy RM Acquisition Strategy RM Acquisition Strategy RM The Acquisition Strategy (AS) Review Module (RM) is a tool that assists Department of Energy (DOE) federal project review teams in evaluating the adequacy of the AS prior to approval of CD-1. The key elements and Lines of Inquiry's (LOIs) identified in this Module were specifically developed to be generic in nature to ensure that they were applicable to as many DOE projects as possible. Therefore, it is essential that the review team use these key elements and LOIs only as a starting point, and that more detailed project specific elements and LOIs be developed to ensure that the project is adequately evaluated. Acquisition Strategy RM More Documents & Publications Conceptual Safety Design RM Checkout, Testing, and Commissioning Plan RM

268

Procurement and Acquisition | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Procurement and Acquisition Procurement and Acquisition Procurement and Acquisition Doing Business With the U.S. Department of Energy Welcome to the Department of Energy's Acquisition homepage. The Office of Procurement and Acquisition Management (OPAM) is responsible for all contracting, financial assistance and related activities to fulfill the Department's multitude of missions through its business relationships. As the business organization of the Department, OPAM develops and supports the policies, procedures and procurement operational elements. We hope that you find the information you're looking for but, if not, please call 202/287-1310 and we'll be glad to assist you. The links below provide additional detail on our policies, procedures and operations. The Office

269

Policy Flash 2013-37 Federal Acquisition Circular (FAC) 2005...  

Energy Savers [EERE]

37 Federal Acquisition Circular (FAC) 2005-66 Policy Flash 2013-37 Federal Acquisition Circular (FAC) 2005-66 Attached is Policy Flash 2013-37 Federal Acquisition Circular (FAC)...

270

Policy Flash 2013-27 Federal Acquisition Circular (FAC) 2005...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

27 Federal Acquisition Circular (FAC) 2005-65 Policy Flash 2013-27 Federal Acquisition Circular (FAC) 2005-65 Attached is Policy Flash 2013-27 Federal Acquisition Circular (FAC)...

271

AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT | Department...  

Broader source: Energy.gov (indexed) [DOE]

AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT Acquisition Letters (AL) that remain in effect are identified below. All other...

272

Data Acquisition-Manipulation At Chena Area (Erkan, Et. Al., 2008) | Open  

Open Energy Info (EERE)

Chena Area (Erkan, Et. Al., 2008) Chena Area (Erkan, Et. Al., 2008) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Chena Geothermal Area (Erkan, Et. Al., 2008) Exploration Activity Details Location Chena Geothermal Area Exploration Technique Data Acquisition-Manipulation Activity Date Usefulness useful DOE-funding Unknown References Kamil Erkan, Gwen Holdmann, Walter Benoit, David Blackwell (2008) Understanding The Chena Hot Springs, Alaska, Geothermal System Using Temperature And Pressure Data From Exploration Boreholes Retrieved from "http://en.openei.org/w/index.php?title=Data_Acquisition-Manipulation_At_Chena_Area_(Erkan,_Et._Al.,_2008)&oldid=400349" Categories: Exploration Activities DOE Funded Activities

273

Summary Results of Electricity Distribution System Challenges and Opportunities  

Broader source: Energy.gov (indexed) [DOE]

6, 2012 6, 2012 Summary Results of Electricity Distribution System Challenges & Opportunities From Breakout Group Sessions Red Team Results Top Challenges * Communication * System Awareness & Modeling * Standards and Interoperability * Need a national scale Grid Operating System (Grid OS) including microgrids - a uniform framework towards operating all of the nation's distribution grids using a collaborative approach - DOE needs to develop an advanced SCADA system definition given to system operators * Bring information together from various sources - differing protocols, lack of a data service bus, automated processes * Lack of a standard communication protocols, data formats/interfaces

274

Energy Sector Stakeholders Attend the Department of Energy¬タルs 2010 Cybersecurity for Energy Delivery Systems Peer Review  

Broader source: Energy.gov (indexed) [DOE]

Sector Stakeholders Attend the Department of Energy's Cybersecurity for Energy Delivery Sector Stakeholders Attend the Department of Energy's Cybersecurity for Energy Delivery Systems Peer Review July 29, 2010 The Department of Energy conducted a Peer Review of its Cybersecurity for Energy Delivery Systems (CEDS) Research and Development Program on July 20-22, during which 28 R&D projects were presented for review by industry stakeholders. More than 65 energy sector stakeholders came to network, present, and learn about DOE projects, while more than 20 joined in by webinar. The CEDS program's national lab, academic, and industry partners-including the National SCADA Test Bed (NSTB) partners and Trustworthy Cyber Infrastructure for the Power Grid (TCIPG) project- presented DOE-supported efforts involving secured SCADA communications and smart grid applications,

275

17.1 - Interagency Acquisitions, Interagency Transactions, and Interagency Agreements  

Broader source: Energy.gov (indexed) [DOE]

June 2012) June 2012) 1 Interagency Acquisitions, Interagency Transactions, and Interagency Agreements CONTENTS Guiding Principles  This chapter provides guidance on interagency acquisitions, interagency transactions and interagency agreements  In addition to interagency acquisitions authorized by the Economy Act, Federal Acquisition Regulation (FAR) 17.5 is revised to broaden the scope of coverage to address all Interagency Acquisitions to include orders over $500,000 issued against Federal Supply Schedules.  Determination of best procurement approach is required for an assisted acquisition or a direct acquisition. The analysis is different for these two determinations.  An assisted acquisition requires a written interagency agreement to include any agency unique

276

February 2013 FPD + Acquisition Workforce News | Department of...  

Energy Savers [EERE]

February 2013 FPD + Acquisition Workforce News February 2013 FPD + Acquisition Workforce News February 2013 newsletter.pub.pdf More Documents & Publications Microsoft Word -...

277

Meeting the Challenge: Integrating Acquisition and Project Management...  

Energy Savers [EERE]

Meeting the Challenge: Integrating Acquisition and Project Management - J. E. Surash, P.E. Meeting the Challenge: Integrating Acquisition and Project Management - J. E. Surash,...

278

POLICY GUIDANCE MEMORANDUM #09A Direct Hire Authority for Acquisition...  

Broader source: Energy.gov (indexed) [DOE]

9A Direct Hire Authority for Acquisition Positions (Expired) POLICY GUIDANCE MEMORANDUM 09A Direct Hire Authority for Acquisition Positions (Expired) THIS GUIDANCE HAS EXPIRED...

279

DOE Acquisition and Project Management (APM) Glossary of Terms...  

Broader source: Energy.gov (indexed) [DOE]

DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL VERSION 9-30-2014 DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL...

280

ACQUISITION LETTER DEAR Part 933 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

ACQUISITION LETTER DEAR Part 933 ACQUISITION LETTER DEAR Part 933 This AL establishes policy and provides guidance for the use of alternative dispute resolution techniques in...

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Green Lease Policies and Procedures for Lease Acquisition | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Green Lease Policies and Procedures for Lease Acquisition Green Lease Policies and Procedures for Lease Acquisition RSL-2007-12 More Documents & Publications Attachment 1: Green...

282

Alternative Fuels Data Center: Vehicle Acquisition Priorities and  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Vehicle Acquisition Vehicle Acquisition Priorities and Alternative Fuel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Vehicle Acquisition Priorities and Alternative Fuel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Vehicle Acquisition Priorities and Alternative Fuel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Vehicle Acquisition Priorities and Alternative Fuel Use Requirement on Google Bookmark Alternative Fuels Data Center: Vehicle Acquisition Priorities and Alternative Fuel Use Requirement on Delicious Rank Alternative Fuels Data Center: Vehicle Acquisition Priorities and Alternative Fuel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Vehicle Acquisition Priorities and Alternative Fuel Use Requirement on

283

Alternative Fuels Data Center: Vehicle Acquisition and Petroleum Reduction  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Vehicle Acquisition Vehicle Acquisition and Petroleum Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Vehicle Acquisition and Petroleum Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Vehicle Acquisition and Petroleum Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Vehicle Acquisition and Petroleum Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Vehicle Acquisition and Petroleum Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Vehicle Acquisition and Petroleum Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Vehicle Acquisition and Petroleum Reduction Requirements on AddThis.com... More in this section...

284

DOE to Resume Filling Strategic Petroleum Reserve: Oil Acquisition...  

Energy Savers [EERE]

to Resume Filling Strategic Petroleum Reserve: Oil Acquisition Slated for 2009 DOE to Resume Filling Strategic Petroleum Reserve: Oil Acquisition Slated for 2009 January 2, 2009 -...

285

Federal Acquisition Circular 2005-36  

Broader source: Energy.gov (indexed) [DOE]

Federal Acquisition Circular 2005-36 Federal Acquisition Circular 2005-36 Item Subject FAR case I.............. Federal Technical Data Solution (FedTeDS) 2008-038 II............. Fair Labor Standards Act and Service Contract 2007-021 Act Price Adjustment Clauses. III............ New Designated Country-Taiwan 2009-014 IV............. Prohibition on Restricted Business Operations 2008-004 in Sudan and Imports from Burma. V.............. List of Approved Attorneys, Abstractors, and 2006-013 Title Companies. VI............. Cost Accounting Standards (CAS) 2007-002 Administration and Associated Federal Acquisition Regulation Clauses. VII............ Technical Amendments

286

Property:DataAcquisition | Open Energy Information  

Open Energy Info (EERE)

DataAcquisition DataAcquisition Jump to: navigation, search Property Name DataAcquisition Property Type Text Description Information on acquisition, including both collection and lists of data repositories. Subproperties This property has the following 27 subproperties: A Active Seismic Techniques Aeromagnetic Survey C Controlled Source Frequency-Domain Magnetics Core Analysis D Direct-Current Resistivity Survey E Electrical Techniques F FLIR FMI Log Frequency-Domain Electromagnetic Survey G Ground Gravity Survey Ground Magnetics H Hand-held X-Ray Fluorescence (XRF) I Isotopic Analysis- Fluid Isotopic Analysis- Rock M Magnetotellurics Mud Logging P PSInSAR R Radar Reflection Survey R cont. Refraction Survey S SRT Self Potential Step-out Well Stereo Satellite Imagery T Telluric Survey Time-Domain Electromagnetics

287

Federal Acquisition Circular 2005-60  

Broader source: Energy.gov (indexed) [DOE]

Circular 2005-60 Circular 2005-60 SUMMARY: This document summarizes the Federal Acquisition Regulation (FAR) rules agreed to by the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) in this Federal Acquisition Circular (FAC) 2005-60. Item Subject FAR Case I Reporting Executive Compensation and First-Tier Subcontract Awards 2008-039 II Payments Under Time-and- Materials and Labor-Hour Contracts 2011-003 III Extension of Sunset Date for Protests of Task and Delivery Orders 2012-007 IV DARPA-New Mexico Tax Agreement 2012-019 V Clarification of Standards for Computer Generation of Forms 2011-022 VI Technical Amendments Item I Reporting Executive Compensation and First-Tier Subcontract Awards (FAR Case

288

Acquisition of Real Property | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Acquisition of Real Property Acquisition of Real Property Acquisition of Real Property Acquisition of Real Property Memorandum of Understanding Between the U.S. Department of Energy and the U.S. Department of Army Amendment to the Memorandum of Understanding Between the U.S. Department of Energy and the U.S. Department of Army Standard Form 118 and 118A Report of Excess Real Property Forms Requirements: Document Title P.L. 106-580 Federal Property and Administrative Services Act of 1949, As Amended P.L. 95-91, Section 647 U.S. Department of Energy Organization Act P.L. 83-703 (68 Stat. 919), Section 161g Grants Special Authority as Required in the Act to Acquire, Sell, Dispose, etc., of Real Property in Furtherance of the Department's Mission (Under the Atomic Energy Act of 1954)

289

Walnut Capital Acquisitions | Open Energy Information  

Open Energy Info (EERE)

Acquisitions Acquisitions Jump to: navigation, search Name Walnut Capital Acquisitions Place Pittsburgh, Pennsylvania Zip 15232 Product Walnut Capital Acquisitions is the project development arm of Walnut Capital, one of Pittsburgh's largest and fastest growing real estate management, development and brokerage companies. Coordinates 40.438335°, -79.997459° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.438335,"lon":-79.997459,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

290

Acquisition Fellows Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

with experience in DOE's acquisition culture who can be contacted by participants on an ad hoc basis as questions come up. * Level 1 Certification - FAC-C Training and applied...

291

OPAM Policy Acquisition Guides | Department of Energy  

Office of Environmental Management (EM)

2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating...

292

OPAM Policy Acquisition Guides | Department of Energy  

Energy Savers [EERE]

0 - Cost Accounting Standards Administration Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause OPAM Policy...

293

Deputy Assistant Secretary for Acquisition and Project Management  

Broader source: Energy.gov (indexed) [DOE]

Surash Surash Deputy Assistant Secretary for Acquisition and Project Management Office of Environmental Management United States Department of Energy On Department of Energy's Major System Construction Projects Before the Subcommittee on Energy and Water Development Committee on Appropriations United States House of Representatives March 20, 2013 Good morning, Mr. Chairman, Ranking Member Kaptur, and Members of the Subcommittee. Thank you for having me here today to provide you an update on the Department of Energy's Office of Environmental Management (EM) major system construction projects and the progress in implementing contract and project management reforms.

294

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fuel Fuel Vehicle (AFV) Acquisition Requirements to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on AddThis.com... More in this section... Federal State Advanced Search

295

Office of Acquisition Management (OAM) | National Nuclear Security  

National Nuclear Security Administration (NNSA)

of Acquisition Management (OAM) | National Nuclear Security of Acquisition Management (OAM) | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Office of Acquisition Management (OAM) Home > About Us > Our Operations > Acquisition and Project Management > Office of Acquisition Management (OAM) Office of Acquisition Management (OAM) Office of Acquisition Management (OAM)

296

Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Alternative Fuel Alternative Fuel Vehicle Acquisition Requirement to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition Requirement on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition Requirement on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition Requirement on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition Requirement on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition Requirement on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

297

Office of Acquisition Management (OAM) | National Nuclear Security  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Acquisition Management (OAM) | National Nuclear Security of Acquisition Management (OAM) | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Office of Acquisition Management (OAM) Home > About Us > Our Operations > Acquisition and Project Management > Office of Acquisition Management (OAM) Office of Acquisition Management (OAM) Office of Acquisition Management (OAM)

298

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Alternative Fuel Alternative Fuel Vehicle (AFV) Acquisition Requirements to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on AddThis.com... More in this section... Federal

299

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Alternative Fuel Alternative Fuel Vehicle (AFV) Acquisition Requirements to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on AddThis.com... More in this section... Federal

300

Memorandum for Chief Acquisition Officers, Senior Procurement Executives  

Broader source: Energy.gov (indexed) [DOE]

June 6, 2008 June 6, 2008 MEMORANDUM FOR CHIEF ACQUISITION OFFICERS SENIOR PROCUREMENT EXECUTIVES FROM: Paul A. Denett Administrator SUBJECT: Improving the Management and Use of Interagency Acquisitions Interagency acquisitions offer important benefits to federal agencies, including economies and efficiencies and the ability to leverage resources. The attached guidance is intended to help agencies achieve the greatest value possible from interagency acquisitions. Effective management and use of interagency acquisitions is a shared responsibility, especially for assisted acquisitions. Lack of clear lines of responsibility between agencies with requirements (requesting agencies) and the agencies which provide acquisition support and

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Alternative Fuel Alternative Fuel Vehicle (AFV) Acquisition Requirements to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on AddThis.com... More in this section... Federal

302

Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Gas Vehicle Gas Vehicle (NGV) Acquisition Requirements to someone by E-mail Share Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Acquisition Requirements on Facebook Tweet about Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Acquisition Requirements on Twitter Bookmark Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Acquisition Requirements on Google Bookmark Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Acquisition Requirements on Delicious Rank Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Acquisition Requirements on Digg Find More places to share Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Acquisition Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

303

Alternative Fuels Data Center: Alternative Fuel Use and Vehicle Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Alternative Fuel Use Alternative Fuel Use and Vehicle Acquisition Requirements to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Use and Vehicle Acquisition Requirements on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Use and Vehicle Acquisition Requirements on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Use and Vehicle Acquisition Requirements on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Use and Vehicle Acquisition Requirements on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Use and Vehicle Acquisition Requirements on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Use and Vehicle Acquisition Requirements on AddThis.com... More in this section...

304

IEEE TRANSACTIONS ON SMART GRID, VOL. 1, NO. 1, JUNE 2010 99 Security Technology for Smart Grid Networks  

E-Print Network [OSTI]

IEEE TRANSACTIONS ON SMART GRID, VOL. 1, NO. 1, JUNE 2010 99 Security Technology for Smart Grid for a smart grid system, including public key infrastructures and trusted computing. Index Terms--Attestation, public key infrastructure (PKI), Su- pervisory Control And Data Acquisition (SCADA), security, smart grid

Hu, Fei

305

Local Sequential Ensemble Kalman Filter for Simultaneously Tracking States and Parameters  

E-Print Network [OSTI]

and parameters using phasor-measurement-unit (PMU) data. Based on simulation studies using multi-machine systems be of significant value if some parameters of dynamic models can be calibrated on line using event data. The real) over a wide area was not possible because data from the Supervisory Control and Data Acquisition (SCADA

Welch, Greg

306

Integrated Safety Management System Guide (Volume 1) for use with Safety Management System Policies (DOE P 450.4, DOE P 450.5, and DOE P 450.6); The Functions, Responsibilities, and Authorities Manual; and DOE Acquisition Regulation  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Department of Energy (DOE) Integrated Safety Management System (ISMS) Guide is approved for use by the Office of Environment, Safety and Health (EH) and the National Nuclear Security Administration (NNSA). This Guide is available for use by all DOE components and their contractors. This Guide is a consensus document coordinated by EH and prepared under the direction of the DOE Safety Management Implementation Team (SMIT). Replaces DOE G 450.4-1A. Canceled by DOE G 450.4-1C.

2001-03-01T23:59:59.000Z

307

Integrated Safety Management System Guide (Volume 1) for use with Safety Management System Policies (DOE P 450.4, DOE P 450.5, and DOE P 450.6); The Functions, Responsibilities, and Authorities Manual; and DOE Acquisition Regulation  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Department of Energy (DOE) Integrated Safety Management System (ISMS) Guide is approved for use by the Office of Environment, Safety and Health (EH) and the National Nuclear Security Administration (NNSA). This Guide is available for use by all DOE components and their contractors. This Guide is a consensus document coordinated by EH and prepared under the direction of the DOE Safety Management Implementation Team (SMIT). Canceled by DOE G 450.4-1C.

2001-03-01T23:59:59.000Z

308

Sandia National Laboratories: Pollution Prevention: Sustainable Acquisition  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sustainable Acquisition Sustainable Acquisition Biobased shredder oil Biobased shredder oil A significant portion of the environmental impacts made by any operation are related to the products and materials they purchase. In fact, for most manufactured products, source materials represent the largest investment in energy and greenhouse gas emissions of the production process1 (including materials, manufacture, and transport). Sustainable acquisition is one way an organization, especially a large one, can take big steps to reduce its environmental impacts. Sandia is aware of the impacts products have on the environment and also of our opportunity, as a volume purchaser, to reduce those impacts. Using guidance provided by the Department of Energy and other federal entities, Sandia works to include these considerations in the sourcing of a wide

309

Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition Requirements to someone by E-mail Acquisition Requirements to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition Requirements on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition Requirements on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition Requirements on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition Requirements on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition Requirements on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle Acquisition Requirements

310

2page.indd  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

D D AT E S O U T H W E S T E R N P O W E R A D M I N I S T R A T I O N S U P P L E M E N T A L E D I T I O N J U LY 1 3 , 2 0 0 6 PMA Partnership Implements New SCADA System at Springfield Operations Center Southwestern successfully installed its new Supervisory Control and Data Acquisition (SCADA) system at its Operations Center in Springfield, MO, on June 20, 2006. This new software, developed in cooperation with Western Area Power Administration (Western), essentially replaces the old Unix-based commercial system with a personal- computer-based SCADA and Automatic Generation Control (AGC) power control system. The new system provides additional functionality that meets recent requirements from the North American Electric Reliability Council for better alarming capabilities and situational awareness, and also

311

untitled  

Broader source: Energy.gov (indexed) [DOE]

sector control centers across the nation, sector control centers across the nation, such as this one at Kansas City Power & Light, benefi t from the system security assessments performed through National SCADA Test Bed industry partnerships. Energy sector owners, operators and system vendors team up to boost control system security with National SCADA Test Bed. By Matt Tani, Automation Editor THE POTENTIAL FOR VULNERABILITIES IN THE ELECTRONIC SYSTEMS THAT MONITOR AND CONTROL OUR ENERGY INFRASTRUCTURE has increased steadily since the mid-1990s. As control systems became increasingly in- terconnected with other control and corporate data networks, the potential for cy- ber intrusion grew as well. When the U.S. Department of Energy (DOE) established the National SCADA [supervisory control and data acquisition] Test Bed (NSTB)

312

Small Business Issues for Environmental Restoration Acquisitions  

Broader source: Energy.gov (indexed) [DOE]

Issues for Environmental Issues for Environmental Restoration Acquisitions The Department of Energy's best practices to reduce and eliminate barriers to small businesses entering into prime contracts for major environmental remediation acquisitions are as follows: Withholding of Payments Billing Cycles Allowability of Insurance Bonding Requirements WITHHOLDING OF PAYMENTS Under a cost reimbursement contract, the Federal Government makes payments conditionally, subject to a final audit. Typically, in a cost reimbursement contract, the Federal Government retains a portion of the payments made to the contractor so that, at the end of the contract, when the final audit is completed and actions are taken to close

313

Cyber Incidents Involving Control Systems  

SciTech Connect (OSTI)

The Analysis Function of the US-CERT Control Systems Security Center (CSSC) at the Idaho National Laboratory (INL) has prepared this report to document cyber security incidents for use by the CSSC. The description and analysis of incidents reported herein support three CSSC tasks: establishing a business case; increasing security awareness and private and corporate participation related to enhanced cyber security of control systems; and providing informational material to support model development and prioritize activities for CSSC. The stated mission of CSSC is to reduce vulnerability of critical infrastructure to cyber attack on control systems. As stated in the Incident Management Tool Requirements (August 2005) ''Vulnerability reduction is promoted by risk analysis that tracks actual risk, emphasizes high risk, determines risk reduction as a function of countermeasures, tracks increase of risk due to external influence, and measures success of the vulnerability reduction program''. Process control and Supervisory Control and Data Acquisition (SCADA) systems, with their reliance on proprietary networks and hardware, have long been considered immune to the network attacks that have wreaked so much havoc on corporate information systems. New research indicates this confidence is misplaced--the move to open standards such as Ethernet, Transmission Control Protocol/Internet Protocol, and Web technologies is allowing hackers to take advantage of the control industry's unawareness. Much of the available information about cyber incidents represents a characterization as opposed to an analysis of events. The lack of good analyses reflects an overall weakness in reporting requirements as well as the fact that to date there have been very few serious cyber attacks on control systems. Most companies prefer not to share cyber attack incident data because of potential financial repercussions. Uniform reporting requirements will do much to make this information available to Department of Homeland Security (DHS) and others who require it. This report summarizes the rise in frequency of cyber attacks, describes the perpetrators, and identifies the means of attack. This type of analysis, when used in conjunction with vulnerability analyses, can be used to support a proactive approach to prevent cyber attacks. CSSC will use this document to evolve a standardized approach to incident reporting and analysis. This document will be updated as needed to record additional event analyses and insights regarding incident reporting. This report represents 120 cyber security incidents documented in a number of sources, including: the British Columbia Institute of Technology (BCIT) Industrial Security Incident Database, the 2003 CSI/FBI Computer Crime and Security Survey, the KEMA, Inc., Database, Lawrence Livermore National Laboratory, the Energy Incident Database, the INL Cyber Incident Database, and other open-source data. The National Memorial Institute for the Prevention of Terrorism (MIPT) database was also interrogated but, interestingly, failed to yield any cyber attack incidents. The results of this evaluation indicate that historical evidence provides insight into control system related incidents or failures; however, that the limited available information provides little support to future risk estimates. The documented case history shows that activity has increased significantly since 1988. The majority of incidents come from the Internet by way of opportunistic viruses, Trojans, and worms, but a surprisingly large number are directed acts of sabotage. A substantial number of confirmed, unconfirmed, and potential events that directly or potentially impact control systems worldwide are also identified. Twelve selected cyber incidents are presented at the end of this report as examples of the documented case studies (see Appendix B).

Robert J. Turk

2005-10-01T23:59:59.000Z

314

Data acquisition and online processing requirements for experimentation at the Superconducting Super Collider  

SciTech Connect (OSTI)

Differences in scale between data acquisition and online processing requirements for detectors at the Superconducting Super Collider and systems for existing large detectors will require new architectures and technological advances in these systems. Emerging technologies will be employed for data transfer, processing, and recording. 9 refs., 3 figs.

Lankford, A.J.; Barsotti, E.; Gaines, I.

1989-07-01T23:59:59.000Z

315

Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition and  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fuel Fuel Vehicle Acquisition and Alternative Fuel Use Requirements to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition and Alternative Fuel Use Requirements on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition and Alternative Fuel Use Requirements on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition and Alternative Fuel Use Requirements on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition and Alternative Fuel Use Requirements on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle Acquisition and Alternative Fuel Use Requirements on Digg Find More places to share Alternative Fuels Data Center: Alternative

316

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition,  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fuel Fuel Vehicle (AFV) Acquisition, Fuel Use, and Emissions Reductions Requirements to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition, Fuel Use, and Emissions Reductions Requirements on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition, Fuel Use, and Emissions Reductions Requirements on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition, Fuel Use, and Emissions Reductions Requirements on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition, Fuel Use, and Emissions Reductions Requirements on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition, Fuel Use, and Emissions Reductions Requirements on Digg

317

FPGA design and implementation for EIT data acquisition  

Science Journals Connector (OSTI)

OXBACT-5 was designed to meet the challenges involved in working in the intensive care hospital environment focussed particularly on thoracic imaging of patients with respiratory distress and chronic heart failure (CHF). The FPGA-based wireless LAN linked multi-channel EIT data acquisition system (DAS) providing 16 programmable excitation current channels and 64 voltage measurement channels is presented. It contains function modules of a PCI bus interface, direct digital synthesizers, dual-port memory blocks, digital demodulation and all the command and control logic in the FPGA. The whole EIT data acquisition system is fully programmable and reconfigurable from the host PC. The excitation frequency, excitation patterns, the measuring sequence and the gain of each measurement channel can be set from the host PC before each measurement. The demodulation is implemented in the FPGA chip to reduce the data rate between the DAS and the host PC. In addition, measurement process management is achieved in this FPGA chip. Complemented by analogue devices such as ADCs, DACs, analogue buffers and analogue multiplexers, the new FPGA-based EIT DAS system is implemented in a very compact way for bedside use in intensive care units of hospitals. It is intended for applications such as continuous respiration monitoring with data collection at 25 frames per second. Image reconstruction times depend on the choice of 2D or 3D imaging algorithms and the available processing power.

Xicai Yue; Chris McLeod

2008-01-01T23:59:59.000Z

318

Acquisition Letter 2009-03 Acquisition Planning-Extending A Management...  

Office of Environmental Management (EM)

AcquisitionLetter2009dash03Rev1.pdf More Documents & Publications Subject: Cost and Price Analysis Microsoft Word - Policy Flash 2010-67 Attachment 1 Subject: Cost and Price...

319

POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition Procedures  

Broader source: Energy.gov [DOE]

Questions concerning this policy flash should be directed to Carol Jenkins, of the Office of Acquisition and Project Management Policy at 202-287-1827 or at Carol.Jenkins@hq.doe.gov

320

Data Acquisition-Manipulation At Northern Basin & Range Region (Blackwell,  

Open Energy Info (EERE)

Data Acquisition-Manipulation At Northern Basin & Data Acquisition-Manipulation At Northern Basin & Range Region (Blackwell, Et Al., 2003) Exploration Activity Details Location Northern Basin and Range Geothermal Region Exploration Technique Data Acquisition-Manipulation Activity Date Usefulness useful DOE-funding Unknown Notes Determining heat loss is one more tool to use in geothermal exploration. It is relatively easy to calculate if the thermal aureole has been mapped with thermal gradient well measurements. With the heat loss information, predicted production capacity can be used to help review the system being explored. References D. D. Blackwell, K. W. Wisian, M. C. Richards, Mark Leidig, Richard Smith, Jason McKenna (2003) Geothermal Resource Analysis And Structure Of Basin And Range Systems, Especially Dixie Valley Geothermal Field, Nevada

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Alternative Fuels Data Center: Virginia Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Virginia Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Virginia Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Virginia Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Virginia Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Virginia Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Virginia Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

322

Alternative Fuels Data Center: Alabama Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Alabama Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Alabama Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Alabama Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Alabama Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Alabama Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Alabama Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

323

Alternative Fuels Data Center: Maine Laws and Incentives for Acquisition /  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Maine Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Maine Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Maine Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Maine Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Maine Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Maine Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

324

Alternative Fuels Data Center: Idaho Laws and Incentives for Acquisition /  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Idaho Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Idaho Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Idaho Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Idaho Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Idaho Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Idaho Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

325

Alternative Fuels Data Center: Florida Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Florida Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Florida Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Florida Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Florida Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Florida Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Florida Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

326

Alternative Fuels Data Center: Ohio Laws and Incentives for Acquisition /  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Ohio Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Ohio Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Ohio Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Ohio Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Ohio Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Ohio Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

327

Alternative Fuels Data Center: Vermont Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Vermont Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Vermont Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Vermont Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Vermont Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Vermont Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Vermont Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

328

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition Requirement to someone by E-mail Acquisition Requirement to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirement on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirement on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirement on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirement on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirement on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

329

Alternative Fuels Data Center: Arizona Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Arizona Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Arizona Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Arizona Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Arizona Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Arizona Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Arizona Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

330

Alternative Fuels Data Center: Oklahoma Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Oklahoma Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Oklahoma Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Oklahoma Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Oklahoma Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Oklahoma Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Oklahoma Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

331

Alternative Fuels Data Center: Iowa Laws and Incentives for Acquisition /  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Iowa Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Iowa Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Iowa Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Iowa Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Iowa Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Iowa Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

332

Alternative Fuels Data Center: Clean Vehicle Acquisition Requirements  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Clean Vehicle Clean Vehicle Acquisition Requirements to someone by E-mail Share Alternative Fuels Data Center: Clean Vehicle Acquisition Requirements on Facebook Tweet about Alternative Fuels Data Center: Clean Vehicle Acquisition Requirements on Twitter Bookmark Alternative Fuels Data Center: Clean Vehicle Acquisition Requirements on Google Bookmark Alternative Fuels Data Center: Clean Vehicle Acquisition Requirements on Delicious Rank Alternative Fuels Data Center: Clean Vehicle Acquisition Requirements on Digg Find More places to share Alternative Fuels Data Center: Clean Vehicle Acquisition Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Clean Vehicle Acquisition Requirements Each state entity must purchase or lease a clean energy vehicle, unless the

333

Alternative Fuels Data Center: Delaware Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Delaware Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Delaware Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Delaware Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Delaware Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Delaware Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Delaware Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

334

Colorado Dry Natural Gas Reserves Acquisitions (Billion Cubic...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Acquisitions (Billion Cubic Feet) Colorado Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

335

Policy Flash 2014-38 Federal Acquisition Circular (FAC) 2005...  

Energy Savers [EERE]

4-38 Federal Acquisition Circular (FAC) 2005-76 Policy Flash 2014-38 Federal Acquisition Circular (FAC) 2005-76 Questions concerning this policy flash should be directed to Jason...

336

POLICY FLASH 2014-31 Federal Acquisition Circulars (FACs) 2005...  

Energy Savers [EERE]

POLICY FLASH 2014-31 Federal Acquisition Circulars (FACs) 2005-73 and 2005-74 POLICY FLASH 2014-31 Federal Acquisition Circulars (FACs) 2005-73 and 2005-74 Questions concerning...

337

Policy Flash 2013-57 New Strategic Sourcing Acquisition Guide...  

Energy Savers [EERE]

57 New Strategic Sourcing Acquisition Guide Chapter 7.2 Policy Flash 2013-57 New Strategic Sourcing Acquisition Guide Chapter 7.2 Questions concerning this policy flash should be...

338

Policy Flash 2014-11 Federal Acquisition Circular (FAC) 2005...  

Broader source: Energy.gov (indexed) [DOE]

1 Federal Acquisition Circular (FAC) 2005-71 Policy Flash 2014-11 Federal Acquisition Circular (FAC) 2005-71 Questions concerning this policy flash should be directed to Barbara...

339

Texas State Offshore Crude Oil + Lease Condensate Reserves Acquisition...  

U.S. Energy Information Administration (EIA) Indexed Site

Acquisitions (Million Barrels) Texas State Offshore Crude Oil + Lease Condensate Reserves Acquisitions (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6...

340

Information Acquisition for Decision Making: Information Source Models  

E-Print Network [OSTI]

Information Acquisition for Decision Making: Information Source Models David Grace Lehigh University Eugene Perevalov Lehigh University Report: 12T-003 #12;Information Acquisition for Decision Making: Information Source Models Draft Abstract The optimal decision making problem in situations characterized

Snyder, Larry

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

California Dry Natural Gas Reserves Acquisitions (Billion Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

Acquisitions (Billion Cubic Feet) California Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

342

Utah Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet...  

Gasoline and Diesel Fuel Update (EIA)

Acquisitions (Billion Cubic Feet) Utah Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

343

Virginia Dry Natural Gas Reserves Acquisitions (Billion Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

Acquisitions (Billion Cubic Feet) Virginia Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

344

Louisiana Dry Natural Gas Reserves Acquisitions (Billion Cubic...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Acquisitions (Billion Cubic Feet) Louisiana Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

345

Montana Dry Natural Gas Reserves Acquisitions (Billion Cubic...  

Gasoline and Diesel Fuel Update (EIA)

Acquisitions (Billion Cubic Feet) Montana Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

346

Ohio Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet...  

U.S. Energy Information Administration (EIA) Indexed Site

Acquisitions (Billion Cubic Feet) Ohio Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

347

Kansas Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet...  

U.S. Energy Information Administration (EIA) Indexed Site

Acquisitions (Billion Cubic Feet) Kansas Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

348

Arkansas Dry Natural Gas Reserves Acquisitions (Billion Cubic...  

Gasoline and Diesel Fuel Update (EIA)

Acquisitions (Billion Cubic Feet) Arkansas Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

349

Wyoming Dry Natural Gas Reserves Acquisitions (Billion Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

Acquisitions (Billion Cubic Feet) Wyoming Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

350

Mississippi Dry Natural Gas Reserves Acquisitions (Billion Cubic...  

Gasoline and Diesel Fuel Update (EIA)

Acquisitions (Billion Cubic Feet) Mississippi Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

351

Alabama Dry Natural Gas Reserves Acquisitions (Billion Cubic...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Acquisitions (Billion Cubic Feet) Alabama Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

352

Texas Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Acquisitions (Billion Cubic Feet) Texas Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

353

Pennsylvania Dry Natural Gas Reserves Acquisitions (Billion Cubic...  

Gasoline and Diesel Fuel Update (EIA)

Acquisitions (Billion Cubic Feet) Pennsylvania Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

354

Michigan Dry Natural Gas Reserves Acquisitions (Billion Cubic...  

Gasoline and Diesel Fuel Update (EIA)

Acquisitions (Billion Cubic Feet) Michigan Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

355

Oklahoma Dry Natural Gas Reserves Acquisitions (Billion Cubic...  

Gasoline and Diesel Fuel Update (EIA)

Acquisitions (Billion Cubic Feet) Oklahoma Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

356

Alaska Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet...  

Gasoline and Diesel Fuel Update (EIA)

Acquisitions (Billion Cubic Feet) Alaska Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

357

Chapter 41 - Acquisition of Utility Services | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1 - Acquisition of Utility Services Chapter 41 - Acquisition of Utility Services 41.1Utilities0.pdf More Documents & Publications AcqGuide41pt1.doc&0; AcqGuide 5.2-OPAM...

358

U.S. Coalbed Methane Proved Reserves Acquisitions (Billion Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

Acquisitions (Billion Cubic Feet) U.S. Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

359

Utah Coalbed Methane Proved Reserves Acquisitions (Billion Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

Acquisitions (Billion Cubic Feet) Utah Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

360

Carbon Compliance Acquisition 5 Limited | Open Energy Information  

Open Energy Info (EERE)

Acquisition 5 Limited Jump to: navigation, search Name: Carbon Compliance Acquisition 5 Limited Place: Greater London, United Kingdom Zip: EC2M 2TD Sector: Carbon Product: This is...

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Alternative Fuels Data Center: Colorado Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Colorado Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Colorado Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Colorado Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Colorado Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Colorado Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Colorado Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

362

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition Requirements to someone by E-mail Acquisition Requirements to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

363

Alternative Fuels Data Center: Wyoming Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Wyoming Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Wyoming Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Wyoming Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Wyoming Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Wyoming Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Wyoming Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

364

Alternative Fuels Data Center: Hawaii Laws and Incentives for Acquisition /  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Hawaii Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Hawaii Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Hawaii Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Hawaii Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Hawaii Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Hawaii Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

365

Alternative Fuels Data Center: Texas Laws and Incentives for Acquisition /  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Texas Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Texas Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Texas Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Texas Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Texas Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Texas Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

366

Alternative Fuels Data Center: Illinois Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Illinois Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Illinois Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Illinois Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Illinois Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Illinois Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Illinois Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

367

Alternative Fuels Data Center: Kentucky Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Kentucky Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Kentucky Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Kentucky Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Kentucky Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Kentucky Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Kentucky Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

368

Alternative Fuels Data Center: Kansas Laws and Incentives for Acquisition /  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Kansas Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Kansas Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Kansas Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Kansas Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Kansas Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Kansas Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

369

Alternative Fuels Data Center: Georgia Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Georgia Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Georgia Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Georgia Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Georgia Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Georgia Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Georgia Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

370

Alternative Fuels Data Center: Nevada Laws and Incentives for Acquisition /  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Nevada Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Nevada Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Nevada Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Nevada Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Nevada Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Nevada Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

371

Alternative Fuels Data Center: Utah Laws and Incentives for Acquisition /  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Utah Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Utah Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Utah Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Utah Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Utah Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Utah Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

372

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition Requirements to someone by E-mail Acquisition Requirements to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

373

Alternative Fuels Data Center: Nebraska Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Nebraska Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Nebraska Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Nebraska Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Nebraska Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Nebraska Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Nebraska Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

374

Alternative Fuels Data Center: Maryland Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Maryland Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Maryland Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Maryland Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Maryland Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Maryland Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Maryland Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

375

Alternative Fuels Data Center: Arkansas Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Arkansas Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Arkansas Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Arkansas Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Arkansas Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Arkansas Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Arkansas Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

376

Alternative Fuels Data Center: Oregon Laws and Incentives for Acquisition /  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Oregon Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Oregon Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Oregon Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Oregon Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Oregon Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Oregon Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

377

Alternative Fuels Data Center: Alaska Laws and Incentives for Acquisition /  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Alaska Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Alaska Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Alaska Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Alaska Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Alaska Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Alaska Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

378

Alternative Fuels Data Center: Indiana Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Indiana Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Indiana Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Indiana Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Indiana Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Indiana Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Indiana Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

379

Alternative Fuels Data Center: Montana Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Montana Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Montana Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Montana Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Montana Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Montana Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Montana Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

380

Alternative Fuels Data Center: Missouri Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Missouri Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Missouri Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Missouri Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Missouri Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Missouri Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Missouri Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Alternative Fuels Data Center: Federal Laws and Incentives for Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Acquisition / Fuel Use to someone by E-mail Acquisition / Fuel Use to someone by E-mail Share Alternative Fuels Data Center: Federal Laws and Incentives for Acquisition / Fuel Use on Facebook Tweet about Alternative Fuels Data Center: Federal Laws and Incentives for Acquisition / Fuel Use on Twitter Bookmark Alternative Fuels Data Center: Federal Laws and Incentives for Acquisition / Fuel Use on Google Bookmark Alternative Fuels Data Center: Federal Laws and Incentives for Acquisition / Fuel Use on Delicious Rank Alternative Fuels Data Center: Federal Laws and Incentives for Acquisition / Fuel Use on Digg Find More places to share Alternative Fuels Data Center: Federal Laws and Incentives for Acquisition / Fuel Use on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

382

Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Goals  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fuel-Efficient Vehicle Fuel-Efficient Vehicle Acquisition Goals to someone by E-mail Share Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Goals on Facebook Tweet about Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Goals on Twitter Bookmark Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Goals on Google Bookmark Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Goals on Delicious Rank Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Goals on Digg Find More places to share Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Goals on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Fuel-Efficient Vehicle Acquisition Goals To help achieve the statewide goal of reducing petroleum use by 20% by July

383

Characteristics of rural bank acquisitions: a logit analysis  

E-Print Network [OSTI]

This study evaluates acquisitions of rural banks by multi-bank holding companies. Evaluation of pre-acquisition characteristics including profitability, size, market concentration, and agricultural lending volume are the basis of the analysis...

Applewhite, Jennifer Lynn

1994-01-01T23:59:59.000Z

384

Data Acquisition-Manipulation At Truckhaven Area (Layman Energy...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Truckhaven Area (Layman Energy Associates, 2007)...

385

Data Acquisition-Manipulation (Monaster And Coolbaugh, 2007)...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation (Monaster And Coolbaugh, 2007) Exploration Activity Details...

386

Data Acquisition-Manipulation (Beck & Cermak, 1989) | Open Energy...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation (Beck & Cermak, 1989) Exploration Activity Details Location...

387

Data Acquisition-Manipulation At Cascades Region (Ingebritsen...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Cascades Region (Ingebritsen & Mariner, 2010) Exploration...

388

The role of product management in the success of mergers and acquisitions : analyzing Eaton's 2008 Phoenixtec Power Company Ltd. acquisition  

E-Print Network [OSTI]

Mergers and acquisitions are important ways for multinational companies to expand and grow their business. This thesis studies the role of product management in the success of mergers and acquisitions by analyzing Eaton's ...

Ren, Lijuan, S.M. Massachusetts Institute of Technology

2013-01-01T23:59:59.000Z

389

CAPTAN: A hardware architecture for integrated data acquisition, control, and analysis for detector development  

SciTech Connect (OSTI)

The Electronic Systems Engineering Department of the Computing Division at the Fermi National Accelerator Laboratory has developed a data acquisition system flexible and powerful enough to meet the needs of a variety of high energy physics applications. The system described in this paper is called CAPTAN (Compact And Programmable daTa Acquisition Node) and its architecture and capabilities are presented in detail here. The three most important characteristics of this system are flexibility, versatility and scalability. These three main features are supported by key architectural features; a vertical bus that permits the user to stack multiple boards, a gigabit Ethernet link that permits high speed communications to the system and the core group of boards that provide specific capabilities for the system. In this paper, we describe the system architecture, give an overview of its capabilities and point out possible applications.

Turqueti, Marcos; Rivera, Ryan A.; Prosser, Alan; Andresen, Jeffry; Chramowicz, John; /Fermilab

2008-11-01T23:59:59.000Z

390

Reference Model for Control and Automation Systems in Electrical Power  

Broader source: Energy.gov (indexed) [DOE]

Reference Model Reference Model for Control and Automation Systems in Electrical Power Version 1.2 October 12, 2005 Prepared by: Sandia National Laboratories' Center for SCADA Security Jason Stamp, Technical Lead Michael Berg, Co-Technical Lead Michael Baca, Project Lead This work was conducted for the DOE Office of Electricity Delivery and Energy Reliability under Contract M64SCADSNL Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. 2 Contents 1 Executive Summary.................................................................................................3 2 Introduction..............................................................................................................4

391

Site Acquisition Description/ Category Contracting Office Solicitation  

Broader source: Energy.gov (indexed) [DOE]

Acquisition Acquisition Description/ Category Contracting Office Solicitation Method Contract Type Estimated Dollar Range Pre-Solicitation Conference/ Industry Meetings Draft- Solicitation Synopsis Solicitation Receipt of Proposal Anticipated Evaluations Complete/Award Paducah GDP http://www.emcbc.doe.g ov/pgdp%20deactivatio n/ EMCBC Multiple award IDIQ contract holders Cost Plus Award Fee with Fixed Price clins $600M- $680M 5/1/2013 5/29/2013 N/A 8/9/2013 Jul-Sep 2013 Oct-Dec 2014 ETEC EMCBC Small Business Firm-Fixed Price & Fixed Unit Rate Price CLINS $25M-$40M 9/19/2013 Jul-Sep 2013 Oct-Dec 2013 Oct-Dec 2013 Jan-Mar 2014 Jul-Sep 2014 Lab Services EMCBC Small Business Fixed Price $40M-$60M Jan-Mar 2014 Jan-Mar 2014 Jan-Mar 2014 Apr-Jun 2014 Apr-Jun 2014 Jan-Mar 2015

392

Federal Acquisition Circular WAC) 2001-24  

Broader source: Energy.gov (indexed) [DOE]

FLASH 2004-20 July 12, 2004 Federal Acquisition Circular WAC) 2001-24 1. Incentives for Use of Performance-Based Contracting for Services (Interim) (FAR Case 2004-004) Effective Date: June 18, 2004 What is the purpose of this FAR Case? This interim rule amends the FAR providing authority to treat perfonnance-based contract or task orders for services as commercial items if specific conditions are met. It also requires agencies to report on perfonnance-based contracts or task orders awarded using this authority. This rulemaking affects FAR Parts 2, Definitions, 12, Acquisition of Commercial Items, 37, Service Contracting, and 52, Solicitation Provisions and Contract Clauses. ~ Provides that performance-based contracts and task orders for services with an estimated value not to exceed $25,000,000, be treated as

393

ADR Provisions in Federal Acquisition Regulation (FAR)  

Broader source: Energy.gov (indexed) [DOE]

ADR Provisions in Federal Acquisition Regulation (FAR) ADR Provisions in Federal Acquisition Regulation (FAR) d. Alternative means of dispute resolution. Notwithstanding any other provision of this chapter, a contractor and a contracting officer may use any alternative means of dispute resolution under subchapter IV of chapter 5 of title 5, or other mutually agreeable procedures, for resolving claims. In a case in which such alternative means of dispute resolution or other mutually agreeable procedures are used, the contractor shall certify that the claim is made in good faith, that the supporting data are accurate and complete to the best of his or her knowledge and belief, and that the amount requested accurately reflects the contract adjustment for which the contractor believes the Government is liable. All provisions of subchapter IV

394

Control Systems Security Standards: Accomplishments And Impacts |  

Broader source: Energy.gov (indexed) [DOE]

Control Systems Security Standards: Accomplishments And Impacts Control Systems Security Standards: Accomplishments And Impacts Control Systems Security Standards: Accomplishments And Impacts This report describes the accomplishments and impacts of the standards team towards achieving these three goals and describes the follow-on efforts that need to be made toward meeting the priority strategies defined in the DOE/DHS Roadmap to Secure Control Systems in the Energy Sector. Control Systems Security Standards: Accomplishments & Impacts More Documents & Publications A Summary of Control System Security Standards Activities in the Energy Sector (October 2005) Roadmap to Secure Control Systems in the Energy Sector 2006 - Presentation to the 2008 ieRoadmap Workshop DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan

395

Federal Energy Management Program: Federal Energy Efficiency Acquisition  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Federal Energy Federal Energy Efficiency Acquisition Guidance and Requirements for Residential Heat Pump Water Heaters to someone by E-mail Share Federal Energy Management Program: Federal Energy Efficiency Acquisition Guidance and Requirements for Residential Heat Pump Water Heaters on Facebook Tweet about Federal Energy Management Program: Federal Energy Efficiency Acquisition Guidance and Requirements for Residential Heat Pump Water Heaters on Twitter Bookmark Federal Energy Management Program: Federal Energy Efficiency Acquisition Guidance and Requirements for Residential Heat Pump Water Heaters on Google Bookmark Federal Energy Management Program: Federal Energy Efficiency Acquisition Guidance and Requirements for Residential Heat Pump Water Heaters on Delicious Rank Federal Energy Management Program: Federal Energy Efficiency

396

Data Acquisition-Manipulation | Open Energy Information  

Open Energy Info (EERE)

Data Acquisition-Manipulation Data Acquisition-Manipulation Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Data Acquisition-Manipulation Details Activities (37) Areas (24) Regions (6) NEPA(0) Exploration Technique Information Exploration Group: Data and Modeling Techniques Exploration Sub Group: Data Techniques Parent Exploration Technique: Data Techniques Information Provided by Technique Lithology: Stratigraphic/Structural: Hydrological: Thermal: Cost Information Low-End Estimate (USD): 60.006,000 centUSD 0.06 kUSD 6.0e-5 MUSD 6.0e-8 TUSD / hour Median Estimate (USD): 250.0025,000 centUSD 0.25 kUSD 2.5e-4 MUSD 2.5e-7 TUSD / hour High-End Estimate (USD): 500.0050,000 centUSD 0.5 kUSD 5.0e-4 MUSD 5.0e-7 TUSD / hour Time Required Low-End Estimate: 5 days0.0137 years

397

National Ignition Facility project acquisition plan  

SciTech Connect (OSTI)

The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.

Callaghan, R.W.

1996-04-01T23:59:59.000Z

398

Data acquisition and control software for XRD beamline at Indus?2  

Science Journals Connector (OSTI)

X?ray diffraction (XRD) beamline is under commissioning on Indus?2 synchrotron radiation facility. The experimental setup of XRD beamline consists of a six?circle diffractometer and various detector systems such as scintillation detector ionization chamber and image plate. The diffractometer can be controlled via EIA232 serial interface or Ethernet. Standard data acquisition software with a graphical user interface has been developed using LabVIEW. A firm safety and error handling scheme is implemented for failsafe operation of the experimental station. This paper describes in detail the data acquisition and control software for the experimental station.

Sanjeev R. Kane; C. K. Garg; A. K. Sinha

2010-01-01T23:59:59.000Z

399

Data Acquisition-Manipulation At Coso Geothermal Area (1979) | Open Energy  

Open Energy Info (EERE)

9) 9) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Coso Geothermal Area (1979) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Data Acquisition-Manipulation Activity Date 1979 Usefulness not indicated DOE-funding Unknown Exploration Basis Determine the potential electrical power in the area Notes The analysis was concentrated on identifying the major sources of surface and ground water, potential limitations on the usage of this water, and the resulting constraints on potentially developable electrical power in each geothermal resource area. References Sakaguchi, J. L. (19 March 1979) Regional Systems Development for Geothermal Energy Resources Pacific Region (California and Hawaii).

400

Review: Advances in 3D data acquisition and processing for industrial applications  

Science Journals Connector (OSTI)

A critical task of vision-based manufacturing applications is to generate a virtual representation of a physical object from a dataset of point clouds. Its success relies on reliable algorithms and tools. Many effective technologies have been developed ... Keywords: 3D images, Data acquisition, Data processing, Point clouds, Surface reconstruction., Vision-based system

Z. M. Bi; Lihui Wang

2010-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

A Knowledge Acquisition Tool for Course of Action Analysis* Ken Barker1  

E-Print Network [OSTI]

. Massachusetts Institute of Technology 4. SRI International 5. The Boeing Company 6. University of Massachusetts of the knowledge acquisition technology to the task of COA analysis. Developing a system deployable subject matter experts (SMEs), unassisted by AI technologists, assemble models of mechanisms and processes

Forbus, Kenneth D.

402

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. (Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System); and Attachment 2, Contractor Requirements Document (paragraph 1d regarding a project management system). Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3 Chg 1.

2000-10-13T23:59:59.000Z

403

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System; and Attachment 2, Contractor Requirements Document paragraph 1d regarding a project management system. Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3A.

2000-10-13T23:59:59.000Z

404

Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fuel-Efficient Vehicle Fuel-Efficient Vehicle Acquisition Requirement to someone by E-mail Share Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirement on Facebook Tweet about Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirement on Twitter Bookmark Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirement on Google Bookmark Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirement on Delicious Rank Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirement on Digg Find More places to share Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

405

Alternative Fuels Data Center: State Vehicle Acquisition and Fuel Use  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

State Vehicle State Vehicle Acquisition and Fuel Use Requirements to someone by E-mail Share Alternative Fuels Data Center: State Vehicle Acquisition and Fuel Use Requirements on Facebook Tweet about Alternative Fuels Data Center: State Vehicle Acquisition and Fuel Use Requirements on Twitter Bookmark Alternative Fuels Data Center: State Vehicle Acquisition and Fuel Use Requirements on Google Bookmark Alternative Fuels Data Center: State Vehicle Acquisition and Fuel Use Requirements on Delicious Rank Alternative Fuels Data Center: State Vehicle Acquisition and Fuel Use Requirements on Digg Find More places to share Alternative Fuels Data Center: State Vehicle Acquisition and Fuel Use Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

406

Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Vehicle Acquisition Vehicle Acquisition and Fuel Use Requirements for State and Alternative Fuel Provider Fleets to someone by E-mail Share Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for State and Alternative Fuel Provider Fleets on Facebook Tweet about Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for State and Alternative Fuel Provider Fleets on Twitter Bookmark Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for State and Alternative Fuel Provider Fleets on Google Bookmark Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for State and Alternative Fuel Provider Fleets on Delicious Rank Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for State and Alternative Fuel Provider Fleets on Digg

407

Alternative Fuels Data Center: Advanced Vehicle Acquisition and Biodiesel  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Advanced Vehicle Advanced Vehicle Acquisition and Biodiesel Fuel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Advanced Vehicle Acquisition and Biodiesel Fuel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Advanced Vehicle Acquisition and Biodiesel Fuel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Advanced Vehicle Acquisition and Biodiesel Fuel Use Requirement on Google Bookmark Alternative Fuels Data Center: Advanced Vehicle Acquisition and Biodiesel Fuel Use Requirement on Delicious Rank Alternative Fuels Data Center: Advanced Vehicle Acquisition and Biodiesel Fuel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Advanced Vehicle Acquisition and Biodiesel Fuel Use Requirement on AddThis.com...

408

Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fuel-Efficient Vehicle Fuel-Efficient Vehicle Acquisition Requirements to someone by E-mail Share Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on Facebook Tweet about Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on Twitter Bookmark Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on Google Bookmark Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on Delicious Rank Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on Digg Find More places to share Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

409

Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fuel-Efficient Vehicle Fuel-Efficient Vehicle Acquisition Requirements to someone by E-mail Share Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on Facebook Tweet about Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on Twitter Bookmark Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on Google Bookmark Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on Delicious Rank Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on Digg Find More places to share Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

410

Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fuel-Efficient Vehicle Fuel-Efficient Vehicle Acquisition Requirements to someone by E-mail Share Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on Facebook Tweet about Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on Twitter Bookmark Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on Google Bookmark Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on Delicious Rank Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on Digg Find More places to share Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

411

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Alternative Fuel Alternative Fuel Vehicle (AFV) Acquisition and Fuel Use Requirements to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition and Fuel Use Requirements on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition and Fuel Use Requirements on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition and Fuel Use Requirements on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition and Fuel Use Requirements on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition and Fuel Use Requirements on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition and Fuel Use Requirements on AddThis.com...

412

Power Districts: Acquisition of Right-of-Way (Nebraska) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Districts: Acquisition of Right-of-Way (Nebraska) Districts: Acquisition of Right-of-Way (Nebraska) Power Districts: Acquisition of Right-of-Way (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Line Extension Analysis Provider Nebraska Public Power District This statute describes procedures for power districts (utilities,

413

NETL: News Release - Data Acquisition Processor Fills Gap for Extreme  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9, 2010 9, 2010 Data Acquisition Processor Fills Gap for Extreme Down-hole Conditions Honeywell Develops Unique Reprogrammable High Temperature Device Morgantown, WV - Honeywell International, Inc. has developed a Reconfigurable Processor for Data Acquisition (RPDA) - a reprogrammable, multi-functional device that can operate at temperatures up to 250oC (482oF). The system is housed in a rugged package suitable for deep down-hole oil and natural gas logging and measurement-while-drilling (MWD) operations, and permanent wellbore installation applications. The project was funded through a cooperative agreement with the National Energy Technology Laboratory (NETL) under the Office of Fossil Energy's Oil and Natural Gas Program. Deep wells are generally defined as having a true vertical depth (TVD) greater than 15,000 feet, while ultra-deep wells are deeper than 25,000 feet TVD. Potential recoverable natural gas and oil resources from deep formations are significant, and deep wells tend to produce at much higher daily rates than conventional shallower wells.

414

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

401 - 17410 of 28,905 results. 401 - 17410 of 28,905 results. Download EA-1862: Finding of No Significant Impact Oneida Seven Generations Corporation: Energy Recovery Project, Green Bay, Wisconsin http://energy.gov/nepa/downloads/ea-1862-finding-no-significant-impact Download Framework for SCADA Security Policy (October 2005) Modern automation systems used in infrastruc-ture (including Supervisory Control and Data Acquisition, or SCADA) have myriad security vulnerabilities. Many of these relate directly to inadequate... http://energy.gov/oe/downloads/framework-scada-security-policy-october-2005 Download IGCA Inventory Sub Guide 040512 http://energy.gov/management/downloads/igca-inventory-sub-guide-040512 Download EIS-0283: Notice of Public Hearing on the Supplement to the Draft Environmental Impact Statement

415

Summary Description Federal Acquisition Circular 2005-58 Federal Acquisition Regulation Amendments  

Broader source: Energy.gov (indexed) [DOE]

Description Description Federal Acquisition Circular 2005-58 Federal Acquisition Regulation Amendments Published in the Federal Register April 18, 2012 Page 23364 ----------------------------------------------------------------------- I. Biobased Procurements FAR Case 2010-004 II. Representation Regarding Export of Sensitive Technology to Iran FAR Case 2010-018 III. Justification and Approval of Sole-Source 8(a) Contracts FAR Case 2009-038 IV. Technical Amendments ----------------------------------------------------------------------------- Item I--Biobased Procurements (FAR Case 2010-004) This final rule amends the FAR to implement changes that require contractors to report the biobased products purchased under service and construction contracts. The Farm Security and Rural Investment Act (7 U.S.C.

416

Definition: Outage Management System | Open Energy Information  

Open Energy Info (EERE)

Outage Management System Outage Management System A software application that can process outage reports from a variety of utility operational systems including SCADA, AMI, and customer phone calls, and display outage information to utility operators. The OMS can help a utility interpret outage information and determine where the likely cause of an outage may be. It can also help the utility optimize its service restoration resources.[1] Related Terms advanced metering infrastructure References ↑ https://www.smartgrid.gov/category/technology/outage_management_system [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Outage_Management_System&oldid=502507

417

Acquisition Guide Chapter 71.1 - Headquarters Business Clearance Process  

Broader source: Energy.gov (indexed) [DOE]

Chapter 71.1 (June 2012) Chapter 71.1 (June 2012) 1 HEADQUARTERS BUSINESS CLEARANCE PROCESS Guiding Principles  Timely acquisition planning is critical  Effective oversight control systems are essential to ensuring the high quality/integrity of procurement transactions  Collaboration and cooperation are required for timely, effective procurement processes Overview This guide chapter provides guidance regarding the policies and procedures governing the Headquarters Business Clearance Review (BCR) process, the process by which certain procurement actions (solicitations, contracts, major contract changes, etc.) are reviewed and approved by the DOE Senior Procurement Executive (SPE) as a condition precedent to executing them. This section does not apply to the National Nuclear Security Administration (NNSA).

418

Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Federal Fleets to someone by E-mail Federal Fleets to someone by E-mail Share Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for Federal Fleets on Facebook Tweet about Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for Federal Fleets on Twitter Bookmark Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for Federal Fleets on Google Bookmark Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for Federal Fleets on Delicious Rank Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for Federal Fleets on Digg Find More places to share Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for Federal Fleets on AddThis.com... More in this section...

419

Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition and  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fuel-Efficient Vehicle Fuel-Efficient Vehicle Acquisition and Alternative Fuel Use Requirements to someone by E-mail Share Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition and Alternative Fuel Use Requirements on Facebook Tweet about Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition and Alternative Fuel Use Requirements on Twitter Bookmark Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition and Alternative Fuel Use Requirements on Google Bookmark Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition and Alternative Fuel Use Requirements on Delicious Rank Alternative Fuels Data Center: Fuel-Efficient Vehicle Acquisition and Alternative Fuel Use Requirements on Digg Find More places to share Alternative Fuels Data Center:

420

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Alternative Fuel Alternative Fuel Vehicle (AFV) Acquisition and Alternative Fuel Use Requirements to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition and Alternative Fuel Use Requirements on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition and Alternative Fuel Use Requirements on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition and Alternative Fuel Use Requirements on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition and Alternative Fuel Use Requirements on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Acquisition and Alternative Fuel Use Requirements on Digg Find More places to share Alternative Fuels Data Center: Alternative

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Report on Acquisition and Project Management Continuous Improvement |  

Broader source: Energy.gov (indexed) [DOE]

on Acquisition and Project Management Continuous Improvement on Acquisition and Project Management Continuous Improvement Report on Acquisition and Project Management Continuous Improvement EM senior management has committed to extensive management reforms and has completed several robust improvements in contract and project management. Additional improvement initiatives are continuing and this document outlines the consolidated plan of these initiatives in a top-down framework of EM vision, goals, strategies, performance metrics, and specific improvement actions completed or being undertaken. Report on Acquisition and Project Management Continuous Improvement More Documents & Publications Microsoft Word - EERE PSRP 7 23 2010 Testimony Before the House Appropriations Subcommittee on Energy and Water Development

422

Acquisition of fish and wildlife habitat along Upper Yakima River  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

factsheet The Bonneville Power Admin- istration is working with the Yakama Nation to acquire and manage a 105 acre parcel in Kittitas County, Washington. BPA funds the acquisition...

423

Policy Flash 2014-29 Acquisition Letter 07 - Benchmark Compensation...  

Energy Savers [EERE]

07 - Benchmark Compensation Amount for Individual Executive Salary Actions Policy Flash 2014-29 Acquisition Letter 07 - Benchmark Compensation Amount for Individual Executive...

424

Knowledge acquisition and modelling for knowledge-intensive CBR.  

E-Print Network [OSTI]

?? This thesis contains a study of state of the art knowledge acquisition modelling principles and methods for modelling general domain knowledge. This includes Newell's (more)

Bakke, Elise

2005-01-01T23:59:59.000Z

425

Unique Hardware and Software Data Acquisition and Processing...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hardware and Software Data Acquisition and Processing Solutions in a Small Engine Test Cell for Enhanced Kinetic Engine Modeling Accuracy Unique Hardware and Software Data...

426

Florida Dry Natural Gas Reserves Acquisitions (Billion Cubic...  

Gasoline and Diesel Fuel Update (EIA)

data. Release Date: 1242014 Next Release Date: 12312015 Referring Pages: Dry Natural Gas Reserves Acquisitions Florida Dry Natural Gas Proved Reserves Dry Natural Gas Proved...

427

Office of Acquisition and Project Management (APM) Organization...  

Broader source: Energy.gov (indexed) [DOE]

MA-60 Org chart DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL VERSION 9-30-2014 Earned Value (EV) Analysis and Project Assessment & Reporting...

428

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Energy.gov [DOE]

This Order provides project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and capable of meeting mission performance and environmental...

429

,"U.S. Coalbed Methane Proved Reserves Acquisitions (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","U.S. Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet)",1,"Annual",2013...

430

,"New York Dry Natural Gas Reserves Acquisitions (Billion Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New York Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet)",1,"Annual",2012 ,"Release...

431

Data Acquisition-Manipulation (Verma & Santoyo, 1997) | Open...  

Open Energy Info (EERE)

Verma & Santoyo, 1997) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation (Verma & Santoyo, 1997) Exploration Activity...

432

Data Acquisition-Manipulation At General Us Region (Blackwell...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At General Us Region (Blackwell, Et Al., 2000) Exploration...

433

Data Acquisition-Manipulation At Valley Of Ten Thousand Smokes...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Valley Of Ten Thousand Smokes Region Area (Kodosky & Keith,...

434

Data Acquisition-Manipulation At Central Nevada Seismic Zone...  

Open Energy Info (EERE)

- 2) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Central Nevada Seismic Zone Region (Coolbaugh, Et Al., 2005...

435

Data Acquisition-Manipulation At General Us Region (Blackwell...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At General Us Region (Blackwell & Richards, 2004) Exploration...

436

Federal Acquisition Circular 2005-50  

Broader source: Energy.gov (indexed) [DOE]

50 50 Federal Register: March 16, 2011 (76 FR 14541) Summary of Cases Item I--Proper Use and Management of Cost-Reimbursement Contracts (FAR Case 2008-030) (Interim) This rule amends the FAR to implement section 864 of the Duncan Hunter National Defense Authorization Act for Fiscal Year 2009 (Pub. L. 110-417). This law aligns with the goal of the Presidential Memorandum on Government Contracting, issued on March 4, 2009, which is to reduce waste, fraud, and abuse in Government contracting. This rule provides internal regulatory guidance on the proper use and management of all contracts, specifically cost-reimbursement contracts. The rule identifies (1) circumstances when cost-reimbursement contracts are appropriate; (2) acquisition plan findings

437

Microsoft Word - Similkameen_Acquisition_CX .docx  

Broader source: Energy.gov (indexed) [DOE]

Dave Roberts Dave Roberts Project Manager - KEWU-4 Proposed Action: Provision of funds to the Washington Department of Fish and Wildlife (WDFW) to purchase two parcels of land from the Trust for Public Land in Okanogan County, Washington. Fish and Wildlife Project No.: 2007-232-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer of land/habitat preservation wildlife management. Location: The two parcels are located in Township 40 North, Range 25 East, Sections 17 and 21 of the Nighthawk 7.5' USGS quadrangle map, in Okanogan County, Washington (northwest of the town of Oroville). Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to fund the acquisition of two parcels of

438

ACQUISITION CERTIFICATION - FINANCIAL ASSISTANCE LEVEL I APPLICATION FOR CERTIFICATION  

Broader source: Energy.gov (indexed) [DOE]

ACQUISITION CERTIFICATION - FINANCIAL ASSISTANCE ACQUISITION CERTIFICATION - FINANCIAL ASSISTANCE LEVEL I APPLICATION FOR CERTIFICATION TECHNICAL PROJECT OFFICER LEVEL I PART A - EMPLOYEE INFORMATION Name (Last, First, Middle initial)_____________________________________________ Email Address____________________________________________________________ Phone __________________________________________________________________ Agency Name____________________________________________________________ Agency Address__________________________________________________________ Title, Series, Grade________________________________________________________ Education: Please specify degree and major: a. Degree: Associates: __; Bachelors __; Masters: __; Doctorate: __

439

Information Acquisition for Decision Making: Answer David Grace  

E-Print Network [OSTI]

Information Acquisition for Decision Making: Answer Depth David Grace Lehigh University Eugene Perevalov Lehigh University Report: 12T-002 #12;Information Acquisition for Decision Making: Answer Depth and in the presence of information sources is considered in a general setting. This brings about the need

Snyder, Larry

440

Performance Based Service Acquisition Toolkit | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Guidance Guidance » Contracting for Support Services » Performance Based Service Acquisition Toolkit Performance Based Service Acquisition Toolkit Performance-based Service Acquisition (PBA) means an acquisition structured around the results to be achieved as opposed to the manner by which the work is to be performed. Performance-based Work Statement (PWS) means that a statement of work for performance-based acquisitions that describes the required results in clear, specific and objective terms with measurable outcomes. Statement of Objectives (SOO) means a Government-prepared document incorporated into the solicitation that states the overall performance objectives. It is used in solicitations when the Government intends to provide the maximum flexibility to each offeror to propose an innovative

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Foreign Direct Investment Acquisitions and Divestitures for the Year 2002  

Gasoline and Diesel Fuel Update (EIA)

Investment Acquisitions and Divestitures for the Year 2002 Investment Acquisitions and Divestitures for the Year 2002 Home > Energy Finance > Foreign Investment in U.S. Energy > Foreign Direct Investment Acquisitions and Divestitures, 2002 Acquisitions of U.S. Energy Assets by Foreign Investors in 2002 Remain High Foreign direct acquisitions are purchases, directly or indirectly, by the original foreign investor resulting in the ownership of 10 percent or more of the voting securities of an incorporated U.S. business enterprise or the equivalent interest in an unincorporated U.S. business. The purchases may include foreign assets owned by the U.S. business that is being acquired. Purchases of a U.S. business or asset by one foreign owner from another foreign owner are not included in the foreign

442

SPR Crude Oil Acquisition Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SPR Crude Oil Acquisition Procedures SPR Crude Oil Acquisition Procedures SPR Crude Oil Acquisition Procedures Section 301(e)(2) of the Energy Policy Act of 2005 (Public Law 109-58) directs the Secretary of Energy to develop procedures to acquire petroleum, subject to certain conditions, in quantities to fill the Strategic Petroleum Reserve (SPR) to the authorized one billion barrel capacity. On April 24, 2006, a Notice of Proposed Rulemaking (NOPR) for acquisition of crude oil for the SPR was published in the Federal Register. The procedures include provisions for acquisition through several means, including direct purchase, by transfer of royalty oil from the Department of the Interior, and by receipt of premium barrels resulting from deferral of scheduled deliveries of petroleum for the Reserve.

443

Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Private and Local Government Fleets to Private and Local Government Fleets to someone by E-mail Share Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for Private and Local Government Fleets on Facebook Tweet about Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for Private and Local Government Fleets on Twitter Bookmark Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for Private and Local Government Fleets on Google Bookmark Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for Private and Local Government Fleets on Delicious Rank Alternative Fuels Data Center: Vehicle Acquisition and Fuel Use Requirements for Private and Local Government Fleets on Digg Find More places to share Alternative Fuels Data Center: Vehicle

444

G0 Electronics and Data Acquisition (Forward-Angle Measurements)  

SciTech Connect (OSTI)

The G$^0$ parity-violation experiment at Jefferson Lab (Newport News, VA) is designed to determine the contribution of strange/anti-strange quark pairs to the intrinsic properties of the proton. In the forward-angle part of the experiment, the asymmetry in the cross section was measured for $\\vec{e}p$ elastic scattering by counting the recoil protons corresponding to the two beam-helicity states. Due to the high accuracy required on the asymmetry, the G$^0$ experiment was based on a custom experimental setup with its own associated electronics and data acquisition (DAQ) system. Highly specialized time-encoding electronics provided time-of-flight spectra for each detector for each helicity state. More conventional electronics was used for monitoring (mainly FastBus). The time-encoding electronics and the DAQ system have been designed to handle events at a mean rate of 2 MHz per detector with low deadtime and to minimize helicity-correlated systematic errors. In this paper, we outline the general architecture and the main features of the electronics and the DAQ system dedicated to G$^0$ forward-angle measurements.

D. Marchand; J. Arvieux; L. Bimbot; A. Biselli; J. Bouvier; H. Breuer; R. Clark; J.-C. Cuzon; M. Engrand; R. Foglio; C. Furget; X. Grave; B. Guillon; H. Guler; P.M. King; S. Kox; J. Kuhn; Y. Ky; J. Lachniet; J. Lenoble; E. Liatard; J. Liu; E. Munoz; J. Pouxe; G. Qumne; B. Quinn; J.-S. Ral; O. Rossetto; R. Sellem

2007-04-18T23:59:59.000Z

445

Compton and Jansen "A philosophical basis for knowledge acquisition" 1/17 A philosophical basis for knowledge acquisition  

E-Print Network [OSTI]

Compton and Jansen "A philosophical basis for knowledge acquisition" 1/17 A philosophical basis. Compton and R. Jansen Garvan Institute of Medical Research, St. Vincent's Hospital Sydney 2010, Australia better solutions to be developed. #12;Compton and Jansen "A philosophical basis for knowledge acquisition

Compton, Paul

446

Data Acquisition-Manipulation At U.S. West Region (Laney, 2005) | Open  

Open Energy Info (EERE)

Laney, 2005) Laney, 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At U.S. West Region (Laney, 2005) Exploration Activity Details Location U.S. West Region Exploration Technique Data Acquisition-Manipulation Activity Date Usefulness useful regional reconnaissance DOE-funding Unknown Notes Characterization and Conceptual Modeling of Magmatically-Heated and Deep-Circulation, High-Temperature Hydrothermal Systems in the Basin and Range and Cordilleran United States, Moore, Nash, Nemcok, Lutz, Norton, Kaspereit, Berard, van de Putte, Johnson and Deymonaz. Utilizing a wealth of formerly proprietary subsurface samples and datasets for exemplary high-temperature western U.S. geothermal systems, develop and publish

447

Transmission and Distribution World March 2007: DOE Focuses on Cyber Security  

Broader source: Energy.gov [DOE]

Energy sector owners, operators and system vendors team up to boost control system security with national SCADA test bed.

448

Securing Wide Area Measurement Systems | Department of Energy  

Energy Savers [EERE]

Pacific Northwest National Laboratory (PNNL) as a project funded by the National SCADA Test Bed Program in cooperation with the Department of Energy's Transmission Reliability...

449

Activities to Secure Control Systems in the Energy Sector | Department...  

Broader source: Energy.gov (indexed) [DOE]

Group (FUPWG) Fall 2008 meeting-covers North American energy infrastructure, SCADA architecture, cyber threat trends, roadmaps, and more. fupwgfall08kenchington.pdf More...

450

Policy Flash 2013-39 Acquisition Guide, Chapter 42.15, Contractor...  

Broader source: Energy.gov (indexed) [DOE]

9 Acquisition Guide, Chapter 42.15, Contractor Performance Information Policy Flash 2013-39 Acquisition Guide, Chapter 42.15, Contractor Performance Information Attached is Policy...

451

Policy Flash 2013-64 Acquisition Letter 10 and Class Deviation...  

Office of Environmental Management (EM)

4 Acquisition Letter 10 and Class Deviation for Nondisplacement of Qualified Workers Policy Flash 2013-64 Acquisition Letter 10 and Class Deviation for Nondisplacement of Qualified...

452

Data Acquisition-Manipulation At Rye Patch Area (Gritto, Et Al...  

Open Energy Info (EERE)

Data Acquisition-Manipulation At Rye Patch Area (Gritto, Et Al., 2000) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulat...

453

Eder Acquisition 2007 Habitat Evaluation Procedures Report.  

SciTech Connect (OSTI)

A habitat evaluation procedures (HEP) analysis was conducted on the Eder acquisition in July 2007 to determine how many protection habitat units to credit Bonneville Power Administration (BPA) for providing funds to acquire the project site as partial mitigation for habitat losses associated with construction of Grand Coulee and Chief Joseph Dams. Baseline HEP surveys generated 3,857.64 habitat units or 1.16 HUs per acre. HEP surveys also served to document general habitat conditions. Survey results indicated that the herbaceous plant community lacked forbs species, which may be due to both livestock grazing and the late timing of the surveys. Moreover, the herbaceous plant community lacked structure based on lower than expected visual obstruction readings (VOR); likely a direct result of livestock impacts. In addition, introduced herbaceous vegetation including cultivated pasture grasses, e.g. crested wheatgrass and/or invader species such as cheatgrass and mustard, were present on most areas surveyed. The shrub element within the shrubsteppe cover type was generally a mosaic of moderate to dense shrubby areas interspersed with open grassland communities while the 'steppe' component was almost entirely devoid of shrubs. Riparian shrub and forest areas were somewhat stressed by livestock. Moreover, shrub and tree communities along the lower reaches of Nine Mile Creek suffered from lack of water due to the previous landowners 'piping' water out of the stream channel.

Ashley, Paul R.

2008-01-01T23:59:59.000Z

454

Deputy Assistant Secretary for Acquisition and Project Management  

Broader source: Energy.gov (indexed) [DOE]

Surash Surash Deputy Assistant Secretary for Acquisition and Project Management Office of Environmental Management United States Department of Energy Contract Management by the Department of Energy's Office of Environmental Management Before the Subcommittee on Financial and Contracting Oversight Committee on Homeland Security and Governmental Affairs United States Senate June 27, 2013 Good morning, Madam Chairman, Ranking Member Johnson, and Members of the Subcommittee. Thank you for this opportunity to provide you an overview of the Department of Energy's Office of Environmental Management (EM) acquisitions and of contract and project management reforms that EM is implementing. I am Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management (APM) in

455

Data Acquisition-Manipulation At Marysville Mt Area (Blackwell) | Open  

Open Energy Info (EERE)

Marysville Mt Area (Blackwell) Marysville Mt Area (Blackwell) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Marysville Mt Area (Blackwell) Exploration Activity Details Location Marysville Mt Area Exploration Technique Data Acquisition-Manipulation Activity Date Usefulness useful DOE-funding Unknown Notes Heat flow analysis. References D. D. Blackwell (Unknown) Exploration In A Blind Geothermal Area Near Marysville, Montana, Usa Retrieved from "http://en.openei.org/w/index.php?title=Data_Acquisition-Manipulation_At_Marysville_Mt_Area_(Blackwell)&oldid=388982" Category: Exploration Activities What links here Related changes Special pages Printable version Permanent link Browse properties About us Disclaimers Energy blogs

456

Acquisitions of Products and Services for Implementation of HSPD-12  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

GSA Federal Supply Service GSA Federal Supply Service August 10, 2005 MEMORANDUM FOR CHIEF FINANCIAL OFFICERS CHIEF INFORMATION OFFICERS CHIEF ACQUISITION OFFICERS FROM: BARBARA L. SHELTON ACTING COMMISSIONER FEDERAL ACQUISITION SERVICE SUBJECT: Acquisitions of Products and Services for Implementation of HSPD-12 Homeland Security Presidential Directive-12 (HSPD-12), "Policy for a Common Identification Standard for Federal Employees and Contractors" requires agencies to use only information technology products and services that meet this standard. The Office of Management and Budget (OMB) has designated the

457

Data Acquisition-Manipulation At Nw Basin & Range Region (Blackwell, Et  

Open Energy Info (EERE)

Blackwell, Et Blackwell, Et Al., 2003) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Nw Basin & Range Region (Blackwell, Et Al., 2003) Exploration Activity Details Location Northwest Basin and Range Geothermal Region Exploration Technique Data Acquisition-Manipulation Activity Date Usefulness useful DOE-funding Unknown Notes Determining heat loss is one more tool to use in geothermal exploration. It is relatively easy to calculate if the thermal aureole has been mapped with thermal gradient well measurements. With the heat loss information, predicted production capacity can be used to help review the system being explored. References D. D. Blackwell, K. W. Wisian, M. C. Richards, Mark Leidig, Richard

458

Data Acquisition-Manipulation At Walker-Lane Transitional Zone Region  

Open Energy Info (EERE)

Blackwell, Et Al., 2003) Blackwell, Et Al., 2003) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Walker-Lane Transitional Zone Region (Blackwell, Et Al., 2003) Exploration Activity Details Location Walker-Lane Transition Zone Geothermal Region Exploration Technique Data Acquisition-Manipulation Activity Date Usefulness useful DOE-funding Unknown Notes Determining heat loss is one more tool to use in geothermal exploration. It is relatively easy to calculate if the thermal aureole has been mapped with thermal gradient well measurements. With the heat loss information, predicted production capacity can be used to help review the system being explored. References D. D. Blackwell, K. W. Wisian, M. C. Richards, Mark Leidig, Richard

459

Policy Flash 2013-36 Update to Congressional Notifications - Acquisition  

Broader source: Energy.gov (indexed) [DOE]

36 Update to Congressional Notifications - 36 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Policy Flash 2013-36 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Attached is Policy Flash 2013-36 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Questions concerning this policy flash and the acquisition guide chapter should be directed to Barbara Binney at (202) 287-1340 or barbara.binney@hq.doe.gov. Questions concerning this policy flash and the financial assistance guide chapter should be directed to Ellen Colligan at (202) 287-1776 or ellen.colligan@hq.doe.gov.

460

Policy Flash 2013-36 Update to Congressional Notifications - Acquisition  

Broader source: Energy.gov (indexed) [DOE]

6 Update to Congressional Notifications - 6 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Policy Flash 2013-36 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Attached is Policy Flash 2013-36 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Questions concerning this policy flash and the acquisition guide chapter should be directed to Barbara Binney at (202) 287-1340 or barbara.binney@hq.doe.gov. Questions concerning this policy flash and the financial assistance guide chapter should be directed to Ellen Colligan at (202) 287-1776 or ellen.colligan@hq.doe.gov.

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Federal Energy Management Program: Model Acquisition Language for  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Model Acquisition Language for Energy-Efficient Product Contracts Model Acquisition Language for Energy-Efficient Product Contracts Training Available Graphic of the eTraining logo Energy-Efficient Federal Purchasing: This intermediate FEMP eTraining course offers hands-on learning on finding, specifying, and selecting energy-efficient products. Energy-Efficient Product Procurement: This introductory FEMP First Thursday Seminar details executive order and Federal Acquisition Regulation requirements for purchasing FEMP-designated and ENERGY STAR products. Federal agencies must insert specific contract language for Energy Efficiency in Energy-Consuming Products as defined in Federal Acquisition Regulation (FAR) Section 52.223-15 in solicitations and contracts when ENERGY STAR®-qualified or FEMP-designated energy-consuming products are:

462

DOE to Resume Filling Strategic Petroleum Reserve: Oil Acquisition Slated  

Broader source: Energy.gov (indexed) [DOE]

Resume Filling Strategic Petroleum Reserve: Oil Acquisition Resume Filling Strategic Petroleum Reserve: Oil Acquisition Slated for 2009 DOE to Resume Filling Strategic Petroleum Reserve: Oil Acquisition Slated for 2009 January 2, 2009 - 9:27am Addthis WASHINGTON, DC -- The U.S. Department of Energy today announced that it plans to take advantage of the recent large decline in crude oil prices, and has issued a solicitation to purchase approximately 12 million barrels of crude oil for the nation's Strategic Petroleum Reserve (SPR) to replenish SPR supplies sold following hurricanes Katrina and Rita in 2005. In addition, DOE is also moving forward with three other SPR acquisition and/or fill activities in order to fill the SPR as Congress directed in the 2005 Energy Policy Act (EPAct): refiner repayments of SPR emergency oil

463

Definition: Data Acquisition-Manipulation | Open Energy Information  

Open Energy Info (EERE)

Definition Definition Edit with form History Facebook icon Twitter icon » Definition: Data Acquisition-Manipulation Jump to: navigation, search Dictionary.png Data Acquisition-Manipulation The process of acquiring data and organizing the data into a useful form so accurate interpretations can be made about the subject matter. The vast majority of data acquisition and manipulation involves automated sensors that detect a physical property in the environment and convert the measurements into electrical signals and numeric values that can be stored and manipulated in a useful manner by a computer program. View on Wikipedia Wikipedia Definition Data acquisition is the process of sampling signals that measure real world physical conditions and converting the resulting samples into

464

,"U.S. Refiner Acquisition Cost of Crude Oil"  

U.S. Energy Information Administration (EIA) Indexed Site

Acquisition Cost of Crude Oil" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","U.S. Refiner...

465

Aerospace mergers and acquisitions from a lean enterprise perspective  

E-Print Network [OSTI]

In the past twenty years, companies in the aerospace industry experienced major transitions: mergers and acquisitions, and lean transformation initiatives. This thesis presents research about the relation of lean efforts ...

Kim, Junhong, 1974-

2004-01-01T23:59:59.000Z

466

,"U.S. Total Refiner Acquisition Cost of Crude Oil"  

U.S. Energy Information Administration (EIA) Indexed Site

Crude Oil" "Sourcekey","R00003","R12003","R13003" "Date","U.S. Crude Oil Composite Acquisition Cost by Refiners (Dollars per Barrel)","U.S. Crude Oil Domestic...

467

GSA Office of Governmentwide Acquisition Policy CIVILIAN AGENCY...  

Broader source: Energy.gov (indexed) [DOE]

LETTER 2012-02 January 27, 2012 MEMORANDUM FOR OTHER THAN NASA FROM: jLAURA ULETTA CHAIR CIVILIAN AGENCY ACQUISITION COUNCIL (CAAC) SUBJECT: Class Deviation from the Federal...

468

The articulatory basis of positional asymmetries in phonological acquisition  

E-Print Network [OSTI]

Child phonological processes that lack counterparts in adult phonological typology have long posed a problem for formal modeling of phonological acquisition. This dissertation investigates child-specific processes with a ...

McAllister, Tara Kathleen

2009-01-01T23:59:59.000Z

469

NOVA-NREL Optimal Vehicle Acquisition Analysis (Brochure)  

SciTech Connect (OSTI)

Federal fleet managers face unique challenges in accomplishing their mission - meeting agency transportation needs while complying with Federal goals and mandates. Included in these challenges are a variety of statutory requirements, executive orders, and internal goals and objectives that typically focus on petroleum consumption and greenhouse gas (GHG) emissions reductions, alternative fuel vehicle (AFV) acquisitions, and alternative fuel use increases. Given the large number of mandates affecting Federal fleets and the challenges faced by all fleet managers in executing day-to-day operations, a primary challenge for agencies and other organizations is ensuring that they are as efficient as possible in using constrained fleet budgets. An NREL Optimal Vehicle Acquisition (NOVA) analysis makes use of a mathematical model with a variety of fleet-related data to create an optimal vehicle acquisition strategy for a given goal, such as petroleum or GHG reduction. The analysis can helps fleets develop a vehicle acquisition strategy that maximizes petroleum and greenhouse gas reductions.

Blakley, H.

2011-03-01T23:59:59.000Z

470

Microsoft Word - Acquisition Guide 32 1 - Reviewing and Approving...  

Energy Savers [EERE]

DOE O 361.1B - Acquisition Career Management Program DOE O 541.1B - Appointment of Contracting Officers and Contracting Officer Representatives Overview The purpose of this Guide...

471

Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this Manual is to provide requirements and guidance to Department of Energy (DOE) employees, including National Nuclear Security Administration (NNSA) employees on the planning and acquisition of capital assets. Does not cancel other directives.

2003-03-28T23:59:59.000Z

472

Model Acquisition Language for Energy-Efficient Product Contracts |  

Broader source: Energy.gov (indexed) [DOE]

Technologies » Energy-Efficient Products » Model Acquisition Technologies » Energy-Efficient Products » Model Acquisition Language for Energy-Efficient Product Contracts Model Acquisition Language for Energy-Efficient Product Contracts October 8, 2013 - 2:39pm Addthis Federal agencies must insert specific contract language for Energy Efficiency in Energy-Consuming Products as defined in Federal Acquisition Regulation (FAR) Section 52.223-15 in solicitations and contracts when ENERGY STAR®-qualified or FEMP-designated energy-consuming products are: Delivered Acquired by the contractor for use in performing services at a Federally-controlled facility Furnished by the contractor for use by the Government Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance.

473

New horizons in the study of child language acquisition  

E-Print Network [OSTI]

Naturalistic longitudinal recordings of child development promise to reveal fresh perspectives on fundamental questions of language acquisition. In a pilot effort, we have recorded 230,000 hours of audio-video recordings ...

Roy, Deb K.

474

Computer video acquisition and analysis system for biological data  

Science Journals Connector (OSTI)

......and 'Department of Medical Biochemistry, Faculty...with overhead spot lighting, while negative...minimize the hardware cost (~ $5000 Can...Heritage Foundation for Medical Research. The support...helping defray the cost of publication of...the Departments of Medical Biochemistry (Faculty......

Thomas P. Keenan; Stephen A. Krawetz

1988-03-01T23:59:59.000Z

475

Database Supported Bacnet Data Acquisition System for Building Energy Diagnostics  

E-Print Network [OSTI]

manufactured by AutomatedLogic Corporation is connected to a Windows 7 computer. In the control panel there are some pre-programmed BACnet object data points. Through command line query, it is already known that these points include ?Analog Fig14... manufactured by AutomatedLogic Corporation is connected to a Windows 7 computer. In the control panel there are some pre-programmed BACnet object data points. Through command line query, it is already known that these points include ?Analog Fig14...

Li, Z.; Augenbroe, G.

2011-01-01T23:59:59.000Z

476

A 64 Channel Transmit System for Single Echo Acquisition MRI  

E-Print Network [OSTI]

the Datasheet for MicroSemi UM9415 PIN Diode .................................................... 53 Figure 3.16 Photo of a T/R Switch .................................................................... 54 Figure 3.17 Reference Design of Mini...

Feng, Ke

2012-10-19T23:59:59.000Z

477

Policy Flash 2013-78 Acquisition Guide Chapter 7.3 Acquisition Planning in the M&O Environment  

Broader source: Energy.gov [DOE]

Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at...

478

EA-1655: Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development  

Broader source: Energy.gov [DOE]

Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development

479

CX-000600: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

600: Categorical Exclusion Determination 600: Categorical Exclusion Determination CX-000600: Categorical Exclusion Determination Supervisory Control and Data Acquisition Upgrades at Bonneville Power Administration's Hungry Horse, Bonneville, and Grand Coulee Substations CX(s) Applied: B4.6 Date: 01/12/2010 Location(s): Grant County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to install Supervisory Control and Data Acquisition (SCADA) upgrades at the United States Army Corps of Engineers' Bonneville 115-kilovolt (kV) Switchyard, and the United States Bureau of Reclamation's Grand Coulee 115-kV, 230-kV, and 500-kV Switchyards and Hungry Horse 230-kV Switchyards. The SCADA upgrade at each switchyard will provide BPA the system monitoring and control necessary to

480

Federal Acquisition Regulation Federal Acquisition Circular 2005-66 Summary of Rules  

Broader source: Energy.gov (indexed) [DOE]

6 Summary of Rules 6 Summary of Rules Item Subject FAR Case I. Definition of Contingency Operation (Interim) 2013-003 II. Changes to Time-and-Materials and Labor-Hour Contracts and Orders 2011-025 III. Extension of Authority for Use of Simplified Acquisition Procedures 2013-007 for Certain Commercial Items IV. Technical Amendment Item I-Definition of Contingency Operation (Interim) (FAR Case 2013-003) This interim rule amends the definition of ''contingency operation'' in FAR 2.101 to address the statutory change to the definition made by paragraph (b) of section 515 of the National Defense Authorization Act for Fiscal Year 2012 (Pub. L. 112-081). Expanding the definition to include responding to a major disaster or emergency will increase the circumstances under which

Note: This page contains sample records for the topic "acquisition scada systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Demand Response Spinning Reserve Demonstration  

E-Print Network [OSTI]

SCE provided SCADA load data for the targeted distribution10-second average load data from SCEs SCADA system. Assecond observation of load data. For each observation during

2007-01-01T23:59:59.000Z

482

Data Acquisition-Manipulation At Central Nevada Seismic Zone Region  

Open Energy Info (EERE)

Central Nevada Seismic Zone Region Central Nevada Seismic Zone Region (Coolbaugh, Et Al., 2005 - 2) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Central Nevada Seismic Zone Region (Coolbaugh, Et Al., 2005 - 2) Exploration Activity Details Location Central Nevada Seismic Zone Geothermal Region Exploration Technique Data Acquisition-Manipulation Activity Date Usefulness useful regional reconnaissance DOE-funding Unknown References Mark Coolbaugh, Richard Zehner, Corne Kreemer, David Blackwell, Gary Oppliger (2005) A Map Of Geothermal Potential For The Great Basin, Usa- Recognition Of Multiple Geothermal Environments Retrieved from "http://en.openei.org/w/index.php?title=Data_Acquisition-Manipulation_At_Central_Nevada_Seismic_Zone_Region_(Coolbaugh,_Et_Al.,_2005_-_2)&oldid=401360"

483

Microsoft Word - AcquisitionLetter95-14.doc  

Broader source: Energy.gov (indexed) [DOE]

Cooperation with the New Independent States of the Former Soviet Union Cooperation with the New Independent States of the Former Soviet Union The following Acquisition Letter 95-14 includes the terms and conditions (both intellectual property and non-intellectual property) that are to be used in subcontracts between DOE national laboratories and institutes in the New Independent States of the Former Soviet Union (NIS). There are two patent and data clauses - one for the Initiatives for Proliferation Program (IPP), formerly known as the Industrial Partnering Program, and one for all other DOE programs. AUTHORITY This Acquisition Letter (AL) is issued by the Procurement Executive pursuant to a delegation from the Secretary and under the authority of the Department of Energy Acquisition Regulation (DEAR) subsections 901.301-70 and 901.301-71.

484

Federal Acquisition Circular 2005-52 Item Subject FAR case  

Broader source: Energy.gov (indexed) [DOE]

Circular 2005-52 Circular 2005-52 Item Subject FAR case I Sustainable Acquisition 2010-001 II Contract Closeout 2008-020 III Prohibition on Contracting with Inverted Domestic Corporations 2008-009 IV Buy American Exemption for Commercial Information Technology - Construction Material 2009-039 V Oversight of Contractor Ethics Programs 2010-017 VI Technical Amendments N/A Item I--Sustainable Acquisition (FAR Case 2010-001) (Interim) This interim rule amends the FAR to implement Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management. It requires Federal agencies to leverage agency acquisitions to foster markets for

485

Federal Requirements and Acquisition Guidance for Low Standby Power  

Broader source: Energy.gov (indexed) [DOE]

Federal Requirements and Acquisition Guidance for Low Standby Power Federal Requirements and Acquisition Guidance for Low Standby Power Products Federal Requirements and Acquisition Guidance for Low Standby Power Products Updated July 2013 Federal agencies must purchase products with a standby power level of 1 watt or less. Standby power is the power consumed by a product when in the lowest power consuming mode. This typically occurs when the product is switched off or not performing its primary purpose. These additional resources can also help Federal agencies meet low standby power purchasing requirements: Low Standby Product List Measuring Standby Power Frequently Asked Questions Meeting Low Standby Power Requirements Table 1 outlines specific standby power requirements and compliance resources by product category. Federal purchases must meet these low

486

Federal Energy Efficiency Acquisition Guidance and Requirements for  

Broader source: Energy.gov (indexed) [DOE]

Heat Pump Water Heaters Heat Pump Water Heaters Federal Energy Efficiency Acquisition Guidance and Requirements for Residential Heat Pump Water Heaters October 30, 2013 - 9:50am Addthis Did You Know? Heat pump water heaters are the most efficient electric water heaters available, saving 50% to 60% over standard products. FEMP provides acquisition guidance and Federal efficiency requirements across a variety of product categories, including residential heat pump water heaters, which are an ENERGY STAR®-qualified product category. Federal laws and executive orders mandate that agencies meet these efficiency requirements in all procurement and acquisition actions that are not specifically exempted by law. The following guidance and requirements apply to residential heat pump water heaters that operate on 250 volts or less, have a current rating of

487

DOE Acquisition Workforce News Acquiring Minds Want to Know  

Broader source: Energy.gov (indexed) [DOE]

Workforce News Workforce News Acquiring Minds Want to Know Office of Acquisition and Project Management SEPTEMBER 2012 Procurement Management Review Program 2 DOE/NNSA Acquisition Workshop 3 Recently Certified FPDs 3 PMCDP Course Schedule 4 Questions of the Month 5 Continuing Education Hours Name Change 5 Causal Connection between Design Maturity and Project Cost Rick Elliott, PE, CCE, CFM, CEM Design maturity is one of the principal criteria that the Office of Acquisition and Project Management considers when evaluating the readiness of a project to receive Critical Decision (CD) 2, Approve Performance Baseline, and CD-3, Approve Start of Construction or Execution. An "immature" design is simply one that has not been fully

488

Status Report: EM Acquisition and Project Management Review  

Broader source: Energy.gov (indexed) [DOE]

Report: Acquisition and Project Report: Acquisition and Project Management Review August 15, 2006 Submitted by: Mr. James Ajello and Mr. Dennis Ferrigno Background: The Environmental Management Advisory Board is in the process of providing Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management (EM-50), records of past EMAB recommendations and commentary. Mr. Ajello and Mr. Ferrigno believe that the records will be helpful to Mr. Surash and his staff. EMAB has identified the following actionable items: Provide Mr. Surash with EMAB committee files for review Have Mr. Ferrigno contact Mr. Surash to arrange a meeting for discussion of said materials Have Mr. Ajello and Mr. Ferrigno meet with Mr. Surash periodically to discuss project management and contract issues, as per request of EM-1.

489

Data Acquisition-Manipulation At Imperial Valley Geothermal Area (1982) |  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Data Acquisition-Manipulation At Imperial Valley Geothermal Area (1982) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Imperial Valley Geothermal Area (1982) Exploration Activity Details Location Imperial Valley Geothermal Area Exploration Technique Data Acquisition-Manipulation Activity Date 1982 Usefulness useful DOE-funding Unknown Exploration Basis Develop parameters to identify geothermal region Notes Statistical methods are outlined to separate spatially, temporally, and magnitude-dependent portions of both the random and non-random components

490

Federal Energy Efficiency Acquisition Guidance and Requirements for  

Broader source: Energy.gov (indexed) [DOE]

Electric Resistance Water Heaters Electric Resistance Water Heaters Federal Energy Efficiency Acquisition Guidance and Requirements for Residential Electric Resistance Water Heaters October 7, 2013 - 10:41am Addthis Did you know? Heat pump water heaters are more efficient than standard electric resistance type products. Using the same plumbing and electrical connections, they serve as a drop-in replacement for electric resistance, storage-type water heaters. FEMP sets Federal efficiency requirements and provides acquisition guidance across a variety of product categories, including residential electric resistance water heaters. Federal laws and executive orders mandate that agencies meet these efficiency requirements in all procurement and acquisition actions that are not specifically exempted by law.

491

New No-Cost ANTFARM Tool Maps Control System Networks to Help Implement  

Broader source: Energy.gov (indexed) [DOE]

New No-Cost ANTFARM Tool Maps Control System Networks to Help New No-Cost ANTFARM Tool Maps Control System Networks to Help Implement Cyber Security Standards New No-Cost ANTFARM Tool Maps Control System Networks to Help Implement Cyber Security Standards Funded under the Department of Energy's National SCADA Test Bed Program, Sandia National Laboratories recently released a new software tool that will aid energy utility owners in mapping and visualizing their control system networks-a critical first step in meeting the North American Electric Reliability Corporation's Critical Infrastructure Protection (NERC CIP) standards. New No-Cost ANTFARM Tool Maps Control System Networks to Help Implement Cyber Security Standards More Documents & Publications Advanced Network Toolkit for Assessments and Remote Mapping (ANTFARM)

492

Data Acquisition-Manipulation At Lassen Volcanic National Park Geothermal  

Open Energy Info (EERE)

Volcanic National Park Geothermal Volcanic National Park Geothermal Area (1982) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Lassen Volcanic National Park Geothermal Area (1982) Exploration Activity Details Location Lassen Volcanic National Park Geothermal Area Exploration Technique Data Acquisition-Manipulation Activity Date 1982 Usefulness useful DOE-funding Unknown Exploration Basis Develop parameters to identify geothermal region Notes Statistical methods are outlined to separate spatially, temporally, and magnitude-dependent portions of both the random and non-random components of the seismicity. The methodology employed compares the seismicity distributions with a generalized Poisson distribution. Temporally related

493

Acquisition & Financial Assistance Self-Assessment Checklist  

Broader source: Energy.gov (indexed) [DOE]

& Financial Assistance & Financial Assistance Self-Assessment Checklist Revised: October 20 10 U.S. Department of Energy Office of Contract Management Office of Procurement & Assistance Management COMPLIANCE REVIEW CRITERIA CHECKl.IST(s) 1 . Construction 2. Contract Completion and Closeout 3. Evaluation and Source Selection 4. Federal Supply Schedule File Review 5. Financial Assistance/Grant File Review 6. Funds Out Interagency Agreements 7. General Contract File Review 8. Government-wide Acquisition Contracts (GWACs) 9. Information Technology Procurements 10. M&O Contract File Review 1 1 . Multiple Award Contracts 12. Options 13. Pre-Award Cost Authorizations, Letter Contracts, and Ratifications 14. Service Contracting 15. Simplified Acquisition File Review

494

Data Acquisition-Manipulation At Truckhaven Area (Layman Energy Associates,  

Open Energy Info (EERE)

2007) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Truckhaven Area (Layman Energy Associates, 2007) Exploration Activity Details Location Truckhaven Area Exploration Technique Data Acquisition-Manipulation Activity Date Usefulness useful DOE-funding Unknown Notes The exploratory work conducted by LEA included the following activities: compilation of public domain resource data (wells, seismic data, geologic maps) Existing public domain wellbore and seismic data were reviewed to help delineate the subsurface structure in the Truckhaven area. Well data also provided a preliminary indication of the subsurface temperature regime. References Layman Energy Associates Inc. (2006) Final Scientific - Technical

495

Revised Acquisition Guide Chapter 42.5, Contract Management Planning  

Broader source: Energy.gov (indexed) [DOE]

2-24 2-24 Date: February 21, 2012 To: Procurement Directors From: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management Subject: Revised Acquisition Guide Chapter 42.5, Contract Management Planning Summary: The Department of Energy (DOE) has been on GAO's High Risk List for the past several years as a result of inadequate contract and project management. Accordingly, the improvement of contract administration is a critical issue for DOE. The Acquisition Guide chapter on Contract Management Planning has been completely revised to address this matter.

496

Acquisitions and alliances in the aerospace industry: an unusual triad  

Science Journals Connector (OSTI)

The two primary sectors of the aerospace industry, commercial and military aviation, are each dominated by two key firms Airbus Industrie and Boeing in the commercial sector, and Lockheed Martin and Boeing in the military sector. This unique triad offers an opportunity for examining how technology acquisition and business development are pursued under such circumstances. The paper shows that alliances are utilised by both major players in commercial aviation, while acquisitions are the principal strategies selected in the military aviation industry. Boeing appears to shift its strategic choices appropriately by industry to match its competitors as well as to correspond to the approach advocated by related technology strategy literature.

Albert Antoine; Carl B. Frank; Hideaki Murata; Edward Roberts

2003-01-01T23:59:59.000Z

497

Data Acquisition-Manipulation At Geysers Geothermal Area (1982) | Open  

Open Energy Info (EERE)

2) 2) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Geysers Geothermal Area (1982) Exploration Activity Details Location Geysers Geothermal Area Exploration Technique Data Acquisition-Manipulation Activity Date 1982 Usefulness useful DOE-funding Unknown Exploration Basis Develop parameters to identify geothermal region Notes Statistical methods are outlined to separate spatially, temporally, and magnitude-dependent portions of both the random and non-random components of the seismicity. The methodology employed compares the seismicity distributions with a generalized Poisson distribution. Temporally related events are identified by the distribution of the interoccurrence times. from the temporal characteristics of the seismicity associated with these

498

Triggering, front-end electronics, and data acquisition for high-rate beauty experiments  

SciTech Connect (OSTI)

The working group explored the feasibility of building a trigger and an electronics data acquisition system for both collider and fixed target experiments. There appears to be no fundamental technical limitation arising from either the rate or the amount of data for a collider experiment. The fixed target experiments will likely require a much higher rate because of the smaller cross section. Rates up to one event per RF bucket (50 MHz) appear to be feasible. Higher rates depend on the details of the particular experiment and trigger. Several ideas were presented on multiplicity jump and impact parameter triggers for fixed target experiments. 14 refs., 3 figs.

Johnson, M.; Lankford, A.J.

1988-04-01T23:59:59.000Z

499

A situational awareness framework for securing the smart grid using monitoring sensors and threat models  

Science Journals Connector (OSTI)

Security, access control and risk mitigation in the smart grid are matters of great impact for this important sector of the critical infrastructure. Situational awareness requires a means of aggregating information and presenting that information in a manner conducive to assessing risk. While major components of the electric power grid were traditionally deployed in physically isolated networks, they are now utilising IP-based, open, interconnected networks to transmit and manage the supervisory control and data acquisition (SCADA) messages. Unfortunately, SCADA protocols used for communications and the systems that implement those protocols were not originally designed with security in mind. Therefore, in order to enhance security and detect potential malicious behaviour, smart grid operators need detailed and accurate information about the status, integrity, configuration and network topology of SCADA devices as well as information about any threats that may impact the grid. This paper describes a comprehensive framework that provides situational awareness (SA) for SCADA devices and their operations in a smart grid environment. Situational awareness is achieved by processing information collected by monitoring sensors and understanding threats that may affect operations. The proposed framework employs a threat modelling methodology to support this mission.

Anastasia Mavridou; Victor Zhou; Jerald Dawkins; Mauricio Papa

2012-01-01T23:59:59.000Z

500

Novelty detection and management to safeguard information-intensive critical infrastructures  

Science Journals Connector (OSTI)

When the complexity of a system increases, the number of possible faults and anomalous working conditions becomes very high; on the contrary, the number of 'normal' behaviours is generally low and often well determined by rules and constraints defined by the characteristics of the furnished services. In this paper, after a general overview of the SAFEGUARD system, a more detailed description of the agents, dedicated to early detection of anomalies and failures inside a Supervisory and Control and Data Acquisition (SCADA) system of an electricity transmission network is given. The paper also describes how it is possible to correlate the detected novelty events and to decide the right recovery policies avoiding inappropriate reactions caused by false alarms. A test benchmark of the novelty detection agents will be executed inside a simulated SCADA electricity transmission system and the layout of the utilised testing environment is described in the paper.

Claudio Balducelli; Luisa Lavalle; Giordano Vicoli

2007-01-01T23:59:59.000Z