  1. Proceedings: Substation equipment diagnostics conference

    SciTech Connect (OSTI)

    Lyons, K.L.

    1994-07-01

    This Substation Equipment Diagnostics Conference held November 3--5, 1993, in New Orleans, Louisiana, reviewed the status of EPRI research on transmission substation diagnostics as well as that of universities, manufacturers, testing organizations, and other researchers. The papers presented were organized under four categories of diagnostics: Transformers, Circuit Breakers, Other Substation Equipment, and Diagnostic Systems.

  2. Proceedings: Substation Equipment Diagnostics Conference IX

    SciTech Connect (OSTI)

    2001-09-01

    Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The ninth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

  3. Proceedings: Tenth EPRI Substation Equipment Diagnostics Conference

    SciTech Connect (OSTI)

    2002-06-01

    Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The tenth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

  4. Proceedings: Substation Equipment Diagnostics Conference VIII

    SciTech Connect (OSTI)

    2000-06-01

    Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The eighth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

  5. MOV surge arresters: improved substation equipment protection

    SciTech Connect (OSTI)

    Niebuhr, W.D.

    1985-07-01

    The introduction of metal-oxide-varistor (MOV) surge arresters has added a new dimension to substation equipment protection. Through the optimal use of these arresters, it is possible to lower surge arrester ratings and thereby improve protective margins, resulting in a possible reduction of the insulation levels (BIL) of substation equipment. This reduction in BIL can lead to a significant reduction in the cost of substation equipment. General methods are delineated for selecting MOV surge arresters for substation protection and the resulting effect on substation equipment insulation levels.

  6. Proceedings: Substation equipment diagnostics conference 6

    SciTech Connect (OSTI)

    Traub, T.P.

    1998-09-01

    Substation Equipment Diagnostics Conference 6 was held to assemble, assess and communicate information on the latest diagnostic techniques, test devices, and systems for substation equipment. It focused on the latest in diagnostic equipment and techniques being developed by EPRI and others in research programs, as well as the equipment and programs now available and in service by electric utilities. The conference brought together the views of researchers, manufacturers and users. The papers presented were organized under three categories: Transformers, Circuit Breakers and Other Substation Equipment, and Communications/Data Management/System Integration. Exhibit booths were provided for attendees to obtain detailed information about vendor products or services.

  7. Proceedings: Substation equipment diagnostics conference III. Proceedings

    SciTech Connect (OSTI)

    1996-03-01

    This Substation Equipment Diagnostics Conference III was held to review the status of transmission substation diagnostics by EPRI, as well as that of the universities, manufacturers, testing organizations, and other researchers. The papers presented were organized under three categories of diagnostics: Transformers, Miscellaneous Equipment, and Systems. A reception on the evening of the first day of the Conference provided an opportunity for the researchers, utilities and manufacturers to display their equipment for the attendees. Separate abstracts have been indexed into the database for articles from this conference.

  8. Substation automation gains momentum with modern options

    SciTech Connect (OSTI)

    Beaty, W.

    1996-12-01

    This paper discusses issues associated with utility substation automation. Monitoring equipment for monitoring power flow, quality, and harmonics for three substations simultaneously is described.

  9. Substation alarm multiplexing system (SAMS)

    SciTech Connect (OSTI)

    ElBadaly, H.; Gaughan, J.; Ward, G.; Amengual, S.

    1996-03-01

    This paper describes an on going R&D project to develop, design, install, and assess the field performance of an advanced substation alarm system. SAMS provides a highly fault-tolerant system for the reporting of equipment alarms. SAMS separates and identifies each of the multiple alarm contacts, transmits an alarm condition over existing substation two-wire system, and displays the alarm source, and its associated technical information, on a touch-screen monitor inside the substation control room, and a remote central location and on a hand held terminal which may be carried anywhere within the substation. SAMS is currently installed at the Sherman Creek substation in the Bronx for the purpose of a three month field evaluation.

  10. High voltage electric substation performance in earthquakes

    SciTech Connect (OSTI)

    Eidinger, J.; Ostrom, D.; Matsuda, E.

    1995-12-31

    This paper examines the performance of several types of high voltage substation equipment in past earthquakes. Damage data is provided in chart form. This data is then developed into a tool for estimating the performance of a substation subjected to an earthquake. First, suggests are made about the development of equipment class fragility curves that represent the expected earthquake performance of different voltages and types of equipment. Second, suggestions are made about how damage to individual pieces of equipment at a substation likely affects the post-earthquake performance of the substation as a whole. Finally, estimates are provided as to how quickly a substation, at various levels of damage, can be restored to operational service after the earthquake.

  11. Electric power substation capital costs

    SciTech Connect (OSTI)

    Dagle, J.E.; Brown, D.R.

    1997-12-01

    The displacement or deferral of substation equipment is a key benefit associated with several technologies that are being developed with the support of the US Department of Energy`s Office of Utility Technologies. This could occur, for example, as a result of installing a distributed generating resource within an electricity distribution system. The objective of this study was to develop a model for preparing preliminary estimates of substation capital costs based on rudimentary conceptual design information. The model is intended to be used by energy systems analysts who need ``ballpark`` substation cost estimates to help establish the value of advanced utility technologies that result in the deferral or displacement of substation equipment. This cost-estimating model requires only minimal inputs. More detailed cost-estimating approaches are recommended when more detailed design information is available. The model was developed by collecting and evaluating approximately 20 sets of substation design and cost data from about 10 US sources, including federal power marketing agencies and private and public electric utilities. The model is principally based on data provided by one of these sources. Estimates prepared with the model were compared with estimated and actual costs for the data sets received from the other utilities. In general, good agreement (for conceptual level estimating) was found between estimates prepared with the cost-estimating model and those prepared by the individual utilities. Thus, the model was judged to be adequate for making preliminary estimates of typical substation costs for US utilities.

  12. The implementation of substation automation coordinated with numerical protection relaying

    SciTech Connect (OSTI)

    Welie, G. van; Carolin, T.

    1994-12-31

    During 1987 Eskom embarked on a process of defining user requirements in the area of substation control. This ultimately resulted in a project being established for the procurement and development of a new generation of substation control equipment. At the same time it was decided to establish a new generation of protection schemes for transmission substations, based on numerical protection relays. From the outset, a high degree of coordination was planned between the substation control and protection equipment. Development contracts were placed with suppliers during late 1990 for the protection schemes and during early 1991 for the substation control equipment. These contracts are nearing completion and the first large installations will commence during 1994. The Transmission Group has committed to employing this new technology in all new substations and all substations to be refurbished. This paper discusses the concept of coordinated substation control and protection and gives insight into implementation issues and functional compromises which had to be made to meet project deadlines.

  13. Substation evaluation using Diagnostic Logic System (DIALOG)

    SciTech Connect (OSTI)

    Andre, W.L.

    1989-08-01

    This project investigated the feasibility of applying a Diagnostic Logic System (DIAGLOG) to evaluate substation operation. The purpose was to see if a determination can be made as to whether the equipment in a substation operated correctly or not when an operating event occurred. The work was directed toward modifying an already proven diagnostic system to create a simplified procedure for describing the operation of substation equipment. Special operating tables or modules of logic were identified for describing relay and breaker operations. The resulting model composed of all the modules connected together is used to evaluate the actual observations available at the substation, and to compare them with what the substation should have produced. The report covers the diagnostic approach used, information on how to construct the modules and examples of diagnosis. Also covered are discussions on the special features of substations that offer a challenge to performing diagnostics. Included in the report are the results of modeling a typical substation and several notes are provided along with an initial library of typical modules which were developed in modeling one of the substations belonging to the Pacific Gas and Electric Company. This substation served as a feasibility demonstrator. 15 figs.

  14. Benefits of Using Mobile Transformers and Mobile Substations...

    Energy Savers [EERE]

    and mobile substations (MTS) to rapidly restore electrical service to areas subjected to blackouts as a result of equipment failure, natural disasters, acts of terrorism, or war. ...

  15. Earth resistivity measurement near substation ground grids

    SciTech Connect (OSTI)

    Lodwig, S.G.; Mateja, S.A.

    1996-11-01

    Proper substation grounding grid design requires good, accurate soil resistivity measurements. This data is essential to model the substation ground grid to design a safe ground grid with a satisfactory ground grid resistance at minimum cost. For substations with several decades of service, there is some concern that a grid may have deteriorated, been damaged during equipment installation or excavation, or that initial soil resistivity measurements were lost or may not have been correctly performed. Ground grid conductors change the substation surface voltage distribution. Any voltage measurements taken at the complete substation will also vary from the tests made without conductors present. During testing, current was injected in the soil by probes placed near the ground grid. The current tends to follow the ground grid conductors since copper is a far better conductor than the soil it is placed in. Resistance readings near grids will be lower than readings in undisturbed soil. Since computer models were unavailable for many years, analyzing the effect of the grid conductors on soil resistivity measurements was very difficult. As a result, soil resistivity measurements made close to substations were of little use to the engineer unless some means of correcting the measured values could be developed. This paper will present results of soil resistivity measurements near a substation ground grid before and after a ground grid has been installed and describes a means of calculating the undisturbed soil model.

  16. Inter substation data communications

    SciTech Connect (OSTI)

    Lukas, M.R.

    1996-10-01

    The paper briefly describes the scada system operated by ComEd for substation communications. This system has proven a reliable means for monitor and control of the generation, transmission, and distribution system. An attempt to automate stand-alone substation functions into the RTU has had limited success. An automated substation capacitor control algorithm was incorporated into a PC. The PC directly interfaced with the RTU through the serial port for analog monitoring and control of the capacitor banks. There were no further enhancements or development of other control algorithms with the PC. The paper discusses the power system data evolution, the proposed design improvements, and implementation concerns.

  17. Substation grounding programs

    SciTech Connect (OSTI)

    Meliopoulos, A.P.S. . Electric Power Lab.)

    1992-05-01

    This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 5, is an applications guide of the three computer programs. SOMIP, SMECC, and SGSYS, for the purpose of designing a safe substation grounding system. The applications guide utilizes four example substation grounding systems for the purpose of illustrating the application of the programs, SOMIP, SMECC, and SGSYS. The examples are based on data provided by four contributing utilities, namely, Houston Lighting and Power Company, Southern Company Services, Puget Sound Power and Light Company, and Arizona Public Service Company. For the purpose of illustrating specific capabilities of the computer programs, the data have been modified. As a result, the final designs of the four systems do not necessarily represent actual grounding system designs by these utilities. The example system 1 is a 138 kV/35 kV distribution substation. The example system 2 is a medium size 230 kV/115 kV transmission substation. The third example system is a generation substation while the last is a large 525 kV/345 kV/230 kV transmission substation. The four examples cover most of the practical problems that a user may encounter in the design of substation grounding systems.

  18. TRANSMISSION AND DISTRIBUTION; POWER SUBSTATIONS; CAPITALIZED...

    Office of Scientific and Technical Information (OSTI)

    AND DISTRIBUTION; POWER SUBSTATIONS; CAPITALIZED COST; CALCULATION METHODS; PLANNING; COST ESTIMATION; MATHEMATICAL MODELS The displacement or deferral of substation...

  19. Substation automation problems and possibilities

    SciTech Connect (OSTI)

    Smith, H.L.

    1996-10-01

    The evolutionary growth in the use and application of microprocessors in substations has brought the industry to the point of considering integrated substation protection, control, and monitoring systems. An integrated system holds the promise of greatly reducing the design, documentation, and implementation cost for the substation control, protection, and monitoring systems. This article examines the technical development path and the present implementation problems.

  20. Variable Voltage Substation Electric Fire and Emergency Response |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Variable Voltage Substation Electric Fire and Emergency Response Variable Voltage Substation Electric Fire and Emergency Response Question from Participant: My question is from an emergency response perspective. It was stated that it took ~ ½ for electricians to de-energize the electrical components before firefighters were allowed in to fight the fire. This delay causes more damage to equipment and potential propagation of the fire. Is there not a "master"

  1. Substation asset management study

    SciTech Connect (OSTI)

    Conroy, M.W.; Conidi, J.

    1996-03-01

    This paper will present an overview of our recent findings in the area of substation asset management and will describe how several utilities, in response to the issues listed above, are re-examining their present maintenance practices in search of more cost-effective programs.

  2. Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation

    SciTech Connect (OSTI)

    Ohler, C.K.

    1991-05-21

    The 69 KV Substation Project is based on the recognized need to provide a continuous, reliable source of power and to improve the firm capacity of the electrical service to all production facilities at Mound. The project consists of the following major element: 69 KV Substation: (1) Install a 69 KV Substation and associated equipment with two parallel 18 MVA transformers. (2) Install duct bank as required and provide 15 KV feeder cable from new substation to existing Substation 95 for connection to Mound`s existing primary distribution system. (3) Install duct bank for underground routing of the 15 KV feeder cable from Manhole 5C to the existing power house cable pit. (4) Reconfigure existing Dayton Power and Light Co. 15 KV switchgear in P Building. The purpose of this Quality Assurance Plan (QA Plan) is to assure that the objectives of the United States Department of Energy (D.O.E.) and EG&G Mound Applied Technologies, Miamisburg, Ohio (Mound) are met for this non-weapons project relative to health and safety, protection of the environment, reliability and continuity of operations, and documentation of quality efforts. This QA Plan identifies the activities and responsibilities which are necessary in the design, procurement, fabrication, installation, and start up of this project in order to meet these objectives.

  3. Substation flood protection: A case study

    SciTech Connect (OSTI)

    Gacek, D.B.; McGovern, L.L.

    1999-11-01

    On July 18, 1996, the City of Naperville, Illinois encountered a substantial storm event ranging from nine to fourteen inches of rainfall across town in less than twelve hours, with the majority falling over a four-hour period. The watershed containing the City`s Westside substation encountered the most significant rainfall totals, resulting in a flood crest in the substation area of approximately thirteen inches of water. The station is a 138 kV substation, and the flooding of this station caused a power loss to approximately 60% of the City`s customers for more than eight hours. The water level posed no threat to yard equipment, however, within the substation control building, flood water shorted out control circuits and damaged transmission line relay systems. Crews worked round-the-clock for most of a week to return all transmission lines and transformers to normal service. The 15 kV switchgear ultimately had to be replaced due to recurring control circuit problems. Once the station was restored and the cleanup efforts underway, the City embarked on an evaluation to determine what condition or conditions allowed the flooding to occur, and what could be done in the future to avoid this problem to ensure that the customers of Naperville would not experience another service outage of this magnitude due to flooding.

  4. PUREX new substation ATR

    SciTech Connect (OSTI)

    Nelson, D.E.

    1997-05-12

    This document is the acceptance test report (ATR) for the New PUREX Main and Minisubstations. It covers the factory and vendor acceptance and commissioning test reports. Reports are presented for the Main 5 kV substation building, the building fire system, switchgear, and vacuum breaker; the minisubstation control building and switch gear; commissioning test; electrical system and loads inspection; electrical utilities transformer and cable; and relay setting changes based on operational experience.

  5. APS team works smarter, cuts substation construction costs by 36%

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    An aggressive, cost-cutting, team of T D employees at Arizona Public Service Co (APS) is building a new distribution substation in Phoenix for less than half the original cost that APS planners had calculated for the project's land, labor and materials. Scheduled for service in June of this year, APS analysts had originally projected land, labor and materials costs for the 20-MVA Bell substation at nearly $1.7-million-not including major equipment such as transformers, circuit breakers, and switches. However, after studying the project, an empowered APS crew was able to slash 36% off the original estimate-more than $610,000. What's more, APS spokesmen say that its new approach to substation construction and design has given its engineers and construction crews a laundry list of additional ideas to try out on future substation ventures. 4 figs., 1 tab.

  6. Intelligent devices simplify remote SCADA installations in substations

    SciTech Connect (OSTI)

    Kopriva, V.J.

    1994-12-31

    Utilities are increasingly relying on Supervisory Control and Data Acquisition (SCADA) Systems for the effective and economical management of electric transmission and distribution systems. Now, advances in equipment and design technologies have created opportunities for an increased level of monitoring and control at electric power substations. In the past, prohibitive factors, including complicated equipment and wiring retrofits, protocol compatibility, and hardware installation and maintenance costs have impeded electric utilities in their attempt at broad based application of SCADA systems in electric substations, particularly at distribution voltage levels. These advances in equipment technologies have provided utilities with the opportunity to install and operate SCADA systems at lower cost, while providing flexibility for system expansion over longer periods. The development of intelligent microprocessor controlled devices and integrated communications has facilitated the use of a distributed design approach to installing SCADA monitoring and control in substations. This approach offers greater hardware flexibility and reduced installation costs while increasing reliability, making the addition of monitoring and control to electric substations increasingly practical. This paper will examine current trends in the application of intelligent microprocessor controlled and electronic devices, in stand alone and distributed applications, and the simplification of techniques for installing SCADA systems in substations. It will also consider the potential advantages to be realized in cost and reliability, and examine the necessary changes in design and operation philosophies required to effectively implement the new technology.

  7. Annual Research Portfolio 2013 Transmission and Substations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ord Transmission & Substations New Components & Materials Research Roadmap 2 2013 Electric Power Research Institute, Inc. All rights reserved. Transmission & Substations Area ...

  8. Reliability centered maintenance for substation equipment

    SciTech Connect (OSTI)

    1996-08-01

    This paper is a collection of training materials on the principles and implementation of reliability centered maintenance. The main areas discussed in this presentation are organized as follows: RCM principles and concepts; RCM tools, resources and methods; overview of the RCM process; example RCM application; living PM program; RCM implementation experience.

  9. Scoping study: Substation design workstation

    SciTech Connect (OSTI)

    Mauser, S.F. ); Conroy, M.W. ); Singh, N.M. )

    1993-03-01

    This project conducted a survey, consisting of a written questionaire, a workshop, and site visits to determine what facets of substation engineering would benefit from incorporation into a workstation environment. Based on the needs expressed by the respondents, a program for the staged development of a Substation Workstation is recommended. Six analytical function modules for assisting in substation engineering were identified for potential inclusion in the workstation: Initial Planning Activities; Physical Plant Design; Analytical Functions; Civil/Structural Design; Environmental Design; and Project Management. The initial release of the Substation Workstation is recommended to include the workstation environment (including MENTOR -- a concept for on-line help, tutorials, notepad, a minor spreadsheet, and interfaces to other regular desktop functions) and portions of the first three functional modules listed above. Recommendations for progress beyond this first release of the workstation included the development of additional capabilities within the initial functional modules, as well as the development of the remaining modules. An overlap exists between the analytical requirements for this workstation and those already included in the EPRI TLWorkstation and the ICWorkstation. In some cases, elements of these other workstations are also suggested for incorporation into the Substation Workstation (such as the foundation analyses from the TLWorkstation), and in others, an assimilation of the other workstation into the Substation Workstation is recommended (as with the ICWorkstation). Estimated resources for implementing the recommended program, including both costs and development time, are also provided.

  10. Integrated substation looks like one RTU to dispatchers

    SciTech Connect (OSTI)

    Koch, W.

    1995-12-01

    Traditionally, supervisory control and data acquisition systems (Scada) use a master/slave arrangement. The master Scada computer polls individual circuit devices for information, or the devices may report (by exception) to the computer. The substation engineering department of Portland General Electric Co (PCE) is now pioneering a new arrangement in which all devices in a substation communicate with each other and a local computer over a data bus. A single communications line connects the Scada master to the same bus for control and/or monitoring. The new approach is known as a substation integration system (SIS). Thus, for a lower initial cost, substation integration: eliminates the need for redundant equipment - such as panel meters, annunciators, transducers, sequence-of-event recorders, auxiliary tripping relays. Scada RTU, control, and transfer switches; reduces control house size by 25% by reducing wiring and using panel space more efficiently; provides a standardized user interface for easy data access, both locally and remotely; is flexible and expandable because of its modularity and use of non-proprietary hardware and software; improves operability, maintainability and reliability through immediate access to key data; and, reduces overall life-cycle costs by reducing travel and outage time through remote access to substation information. 5 figs.

  11. Transient performance of substation structures and associated grounding systems

    SciTech Connect (OSTI)

    Dawalibi, F.P.; Xiong, W.; Ma, J.

    1995-05-01

    When lightning strikes an electric substation, large currents generated by the stroke flow in the above ground structures and grounding system and dissipate in the soil. The electromagnetic fields generated by such high currents may cause damage to equipment and may be dangerous to personnel working nearby. In this paper, the frequency and time domain performance of a substation subjected to a lightning strike is described and discussed. The computed scalar potentials, electric fields, and magnetic fields are presented graphically as a function of spatial coordinates, as a function of time and as a function of both. Two cases are considered. The first case examines the substation grounding system only, while the second case includes an above-ground structure as well. It is believed that the results of the second case have not been published before. A double exponential lightning surge current is injected at one corner of the substation. The response of the grounding system to the frequency domain electromagnetic spectrum of this signal is computed by a frequency domain electromagnetic field analysis software package. The temporal and spatial distributions of the electromagnetic fields inside and near the substation are obtained by an inverse Fourier transformation of all these responses. The presence of a soil with an arbitrary resistivity and permittivity is accurately taken into account. The analysis sheds some new light on the understanding of the effects which take place at the higher frequencies.

  12. Reliability centered maintenance (RCM) for substations project overview

    SciTech Connect (OSTI)

    Lyons, P.F.

    1996-08-01

    An EPRI Tailored Collaboration project establishing guidelines and tools for implementing Reliability Centered Maintenance (RCM) in substations is nearing completion and final results are being presented at this Substation RCM Conference. The ultimate goal of this RCM project is to help utilities slash substation operations and maintenance costs by optimizing equipment maintenance intervals. Preventive maintenance (PM) programs typically have been developed on a component-by-component basis, relying heavily on equipment vendors` maintenance recommendations. RCM is a logical alternative to traditional PM programs. It is intelligent, common sense maintenance that is function-based rather than component-based. First developed by the airline industry in the 1960s and further developed and applied to the nuclear industry by EPRI in the 1980s, RCM ranks the importance of each function of a system, calculates the impact the loss of the function would have on the overall system, and drives the design of appropriate maintenance tasks for each function. The nuclear industry reaped savings of at least 25% by adopting RCM, and one utility that tried this approach for substation maintenance reported savings of 13% in one year.

  13. Wolf Point Substation, Roosevelt County, Montana

    SciTech Connect (OSTI)

    Not Available

    1991-05-01

    The Western Area Power Administration (Western), an agency of the United States Department of Energy, is proposing to construct the 115-kV Wolf Point Substation near Wolf Point in Roosevelt County, Montana (Figure 1). As part of the construction project, Western's existing Wolf Point Substation would be taken out of service. The existing 115-kV Wolf Point Substation is located approximately 3 miles west of Wolf Point, Montana (Figure 2). The substation was constructed in 1949. The existing Wolf Point Substation serves as a Switching Station'' for the 115-kV transmission in the region. The need for substation improvements is based on operational and reliability issues. For this environmental assessment (EA), the environmental review of the proposed project took into account the removal of the old Wolf Point Substation, rerouting of the five Western lines and four lines from the Cooperatives and Montana-Dakota Utilities Company, and the new road into the proposed substation. Reference to the new proposed Wolf Point Substation in the EA includes these facilities as well as the old substation site. The environmental review looked at the impacts to all resource areas in the Wolf Point area. 7 refs., 6 figs.

  14. Annual Research Portfolio 2013 Transmission and Substations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ord Transmission & Substations New Components & Materials Research Roadmap 2 © 2013 Electric Power Research Institute, Inc. All rights reserved. Transmission & Substations Area Overhead Transmission Lines (P35) Underground Transmission Lines (P36) HVDC (P162) Substations (P37) Asset Related Research 3 © 2013 Electric Power Research Institute, Inc. All rights reserved. EPRI's Mission Advancing safe, reliable, affordable and environmentally responsible electricity for society through

  15. Electric power substation capital costs (Technical Report) |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Subject: 24 POWER TRANSMISSION AND DISTRIBUTION; POWER SUBSTATIONS; CAPITALIZED COST; CALCULATION METHODS; PLANNING; COST ESTIMATION; MATHEMATICAL MODELS Word Cloud More Like This ...

  16. Supervisory Transmission Lines and Substation Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) 615...

  17. National SCADA Test Bed Substation Automation Evaluation Report...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: National SCADA Test Bed Substation Automation Evaluation Report Citation Details In-Document Search Title: National SCADA Test Bed Substation Automation ...

  18. National SCADA Test Bed Substation Automation Evaluation Report...

    Office of Scientific and Technical Information (OSTI)

    National SCADA Test Bed Substation Automation Evaluation Report Citation Details In-Document Search Title: National SCADA Test Bed Substation Automation Evaluation Report You ...

  19. A complete and normalized 61850 substation (Smart Grid Project...

    Open Energy Info (EERE)

    as a means to improve the design, maintenance and operation of the substation automation systems. Design a standard substation considering the existing and new solutions...

  20. Substation automation -- a ``bottoms up`` approach

    SciTech Connect (OSTI)

    Thomas, J.

    1996-10-01

    The proliferation of multi-purpose intelligent electronic devices in substations brought the availability of abundant and often overlapping data at the substation. This data can be used for improving the operation and maintenance of the substations and the entire power system. The objective of substation automation is to use technology to gather, consolidate and utilize this data for increasing the efficiency of power system operation and maintenance. Often automation functions are developed and offered around the capabilities of the preferred hardware and software of the integrator. Emphasis is placed on hardware, software and communication protocols rather than need, methodology and application. This can result in over-automation with complex, expensive and ineffective systems, or under-automation that fails to achieve the user`s objectives. The objective is to select appropriate hardware, software and methodology to build the most cost effective system to get the desired results. This paper describes steps to ensure the successful implementation of substation automation.

  1. Lessons learned from substation predictive maintenance project, TC project {number_sign}7014. Final report

    SciTech Connect (OSTI)

    Geisecke, J.; Spencer, G.; Richardson, F.

    1998-12-01

    The EPRI Maintenance and Diagnostics Center, through a tailored collaboration effort with 10 utilities, developed a Substation Predictive Maintenance Program (SPDM). The objective of the program was to reduce Operation and Maintenance (O and M) costs by applying predictive/condition based maintenance practices to energized substation equipment. This report presents a summary of the project including: how new and existing diagnostic technologies and equipment were evaluated and utilized; how information was gathered in program cost justification and savings and specific work procedures and program administrative aids for a SPDM process. The program was effective in implementing a preventive or condition based maintenance process for participating utilities--enhancing the prioritization or work, redirecting maintenance activity and reducing costs. This document can serve as an implementation guide with lessons learned for substation predictive maintenance processes or to compare and contrast programs currently in place.

  2. Electrician - Foreman II (Transmission Lines & Substations) ...

    Broader source: Energy.gov (indexed) [DOE]

    Region Transmission Lines and Substation Maintenance (G5200) 615 S. 43rd Avenue Phoenix, AZ 85009 Duty Location is Page, AZ Find out more about living conditions at this...

  3. Experimental adoption of RCM in EDF substations

    SciTech Connect (OSTI)

    Heroin, G.; Aupied, J.; Sanchis, G.

    1996-08-01

    EDF, after testing Reliability Centered Maintenance (RCM) on systems used in nuclear power plants, has now successfully extended RCM to all of its nuclear power plants. In the light of this experience, EDF has committed itself to a pilot study on a line bay of a 400 kV substation in 1992. The RCM method as applied benefited from EDF`s policy of maintenance, introduced five years ago on all substations, which has enhanced prospects of reliability. The original feature in the selection of maintenance tasks was that it brought into play two criteria for failure assessment - frequency and seriousness - and two criteria for maintenance task selection - efficiency and facility. The final outcome of RCM as applied to substation maintenance is to categorize maintenance tasks into: (1) essential maintenance tasks, (2) optional tasks, depending on the type and location of the substation, as well as on factors relating to local management of maintenance policy, and (3) unnecessary tasks.

  4. Substation grounding programs. Volume 5, Applications manual

    SciTech Connect (OSTI)

    Meliopoulos, A.P.S.

    1992-05-01

    This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 5, is an applications guide of the three computer programs. SOMIP, SMECC, and SGSYS, for the purpose of designing a safe substation grounding system. The applications guide utilizes four example substation grounding systems for the purpose of illustrating the application of the programs, SOMIP, SMECC, and SGSYS. The examples are based on data provided by four contributing utilities, namely, Houston Lighting and Power Company, Southern Company Services, Puget Sound Power and Light Company, and Arizona Public Service Company. For the purpose of illustrating specific capabilities of the computer programs, the data have been modified. As a result, the final designs of the four systems do not necessarily represent actual grounding system designs by these utilities. The example system 1 is a 138 kV/35 kV distribution substation. The example system 2 is a medium size 230 kV/115 kV transmission substation. The third example system is a generation substation while the last is a large 525 kV/345 kV/230 kV transmission substation. The four examples cover most of the practical problems that a user may encounter in the design of substation grounding systems.

  5. Scoping study: Substation design workstation. Final report

    SciTech Connect (OSTI)

    Mauser, S.F.; Conroy, M.W.; Singh, N.M.

    1993-03-01

    This project conducted a survey, consisting of a written questionaire, a workshop, and site visits to determine what facets of substation engineering would benefit from incorporation into a workstation environment. Based on the needs expressed by the respondents, a program for the staged development of a Substation Workstation is recommended. Six analytical function modules for assisting in substation engineering were identified for potential inclusion in the workstation: Initial Planning Activities; Physical Plant Design; Analytical Functions; Civil/Structural Design; Environmental Design; and Project Management. The initial release of the Substation Workstation is recommended to include the workstation environment (including MENTOR -- a concept for on-line help, tutorials, notepad, a minor spreadsheet, and interfaces to other regular desktop functions) and portions of the first three functional modules listed above. Recommendations for progress beyond this first release of the workstation included the development of additional capabilities within the initial functional modules, as well as the development of the remaining modules. An overlap exists between the analytical requirements for this workstation and those already included in the EPRI TLWorkstation and the ICWorkstation. In some cases, elements of these other workstations are also suggested for incorporation into the Substation Workstation (such as the foundation analyses from the TLWorkstation), and in others, an assimilation of the other workstation into the Substation Workstation is recommended (as with the ICWorkstation). Estimated resources for implementing the recommended program, including both costs and development time, are also provided.

  6. Planning substation capacity under the single-contingency scenario

    SciTech Connect (OSTI)

    Leung, L.C.; Khator, S.K.; Schnepp, J.C.

    1995-08-01

    Florida Power and Light (FPL) adopts the single contingency emergency policy for its planning of substation capacity. This paper provides an approach to determine the maximum load which a substation can take on under such a policy. The approach consists of two LP models which determine: (1) the maximum substation load capacity, and (2) the reallocation of load when a substation`s demand cannot be met. Both models are formulated under the single-contingency scenario, an issue which had received little attention in the literature. Not only does the explicit treatment of the scenario provide an exact measure of a substation`s load limit, it also raises several important issues which previous works omit. These two models have been applied to the substation network of the Fort Myers District of the State of Florida.

  7. Utility programs for substation diagnostics development

    SciTech Connect (OSTI)

    1996-03-01

    This article is a brief overview of the opening remarks of the utility panel. These remarks developed a number of interesting substation diagnostic activities and concepts in which the electric utilities are engaged and outlined the considerations which must accompany development of diagnostic sensors and systems. These area include transformer diagnostics, circuit breaker diagnostics, and testing/cost of diagnostic systems.

  8. Workshop on user experience with gas-insulated substations

    SciTech Connect (OSTI)

    Graybill, H.W.

    1981-12-01

    There is widespread interest among American and Canadian utilities in the interchange of operating and maintenance experience with gas-insulated substations (GIS). Those utilities who do not yet have GIS on their systems are likewise interested in the operating experience of those who do. A two-day workshop on GIS was held in Portland, Oregon, on July 30 and 31, 1981. The first day of the workshop was open to users only, and the agenda for the day consisted of user presentations on the following subjects: GIS station design and layout; specification and acquisition of GIS equipment; installation and commissioning; and operation and maintenance. On the second day, manufacturers were invited to present their experience, status, and progress in recent developments and improvements. The session was concluded with a general discussion of experience, problems, etc. No formal written papers were presented. The highlights of each verbal presentation and of ensuing discussion are presented in this report.

  9. Modeling and Simulating Blast Effects on Electric Substations

    SciTech Connect (OSTI)

    Lyle G. Roybal; Robert F. Jeffers; Kent E. McGillivary; Tony D. Paul; Ryan Jacobson

    2009-05-01

    A software simulation tool was developed at the Idaho National Laboratory to estimate the fragility of electric substation components subject to an explosive blast. Damage caused by explosively driven fragments on a generic electric substation was estimated by using a ray-tracing technique to track and tabulate fragment impacts and penetrations of substation components. This technique is based on methods used for assessing vulnerability of military aircraft and ground vehicles to explosive blasts. An open-source rendering and ray-trace engine was used for geometric modeling and interactions between fragments and substation components. Semi-empirical material interactions models were used to calculate blast parameters and simulate high-velocity material interactions between explosively driven fragments and substation components. Finally, a Monte Carlo simulation was added to model the random nature of fragment generation allowing a skilled analyst to predict failure probabilities of substation components.

  10. Knowledge engineering tool for training power-substation operators

    SciTech Connect (OSTI)

    Lambert-Torres, G. |; Costa, C.I.A.; Alves da Silva, A.P.; Ribeiro, G.M.; Quintana, V.H.

    1997-04-01

    Artificial intelligence techniques have been applied to create systems that can give answers for different situations and assistance during the substation switching operation. These techniques have also been used for training purposes. This paper presents a computational package for training power substation operators in the control and corrective actions using expert system techniques. Illustrative examples are presented using a 138-kV CEMIG substation.

  11. EA-2013: Herbicide Application at Three Substations; Imperial...

    Office of Environmental Management (EM)

    Imperial County (California), Maricopa and Yuma Counties (Arizona) EA-2013: Herbicide Application at Three Substations; Imperial County (California), Maricopa and Yuma ...

  12. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild...

    Energy Savers [EERE]

    Colorado. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project Public Comment Opportunities No public comment opportunities available at this time....

  13. 351 Substation Demolition -- B Roll | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    351 Substation Demolition -- B Roll 351 Substation Demolition -- B Roll Addthis Description The U.S. Department of Energy (DOE) recently teamed with contractor Washington Closure Hanford to complete a major recycling effort during cleanup of the Hanford Site in southeastern Washington State.

  14. Grizzly Substation Fiber Optics : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1998-02-01

    This notice announces BPA`s decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The US Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOE/EA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the US Forest Service and BPA have determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI. The US Forest Service has separately issued a FONSI and Decision Notice authorizing BPA to construct, operate, and maintain the Project within the Crooked River National Grassland (Grassland).

  15. Substation voltage upgrading. Volume 2, Substation insulation tests and design for fast front lightning impulses: Final report

    SciTech Connect (OSTI)

    Panek, J.; Elahi, H.; Lux, A.; Imece, A.F.; LaPanse, R.A.; Stewart, J.R.

    1992-04-01

    This report addresses specific issues to support sound yet not unduly conservative uprating practices for substations. The main parts of the report cover the insulation withstand and overvoltage protection aspects, environmental measurements, reliability criteria, and industry experience. First the insulation design concerns are addressed. Substation stress by a backflashover of the line insulation due to lightning in the vicinity of the substation is recognized as a critical stress. A representative part of a 550 kV BIL substation was erected at the EPRI High Voltage Transmission Research Center, where also a special test circuit was assembled to produce a fast front, slow tail (0.2/200 {mu}s) wave. The substation as well as some special configurations were tested for line-to-ground and line-to-line withstand. Computer studies were performed to complement the test results. A number of important conclusions was reached. The most prominent result in that the high frequency oscillations, as caused by reflections within the substation, do not effect the Critical Flashover Voltage (CFO). The present practice, based on the highest peak is therefore very conservative. The slow tail of the wave appears to dictate the CFO. An arrester model for computer studies to represent very fast as well as slow phenomena was derived. It is based on full scale arrester test data, made available in this project. The computer program to calculate arrester model parameters is also a part of the report. The electric environmental measurements are reported for the tested substation at the HVTRC and for the uprated substation of Public Service Company of Colorado, both before and after the uprating. The performance is satisfactory when corona free hardware is used. Insulation design criteria are analyzed based on substation reliability, the system viewpoint and consequences of the failure. Utility experience with uprated substations is reviewed.

  16. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  17. Benefits of Using Mobile Transformers and Mobile Substations for Rapidly

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Restoring Electrical Service: a Report to the United States Congress Pursuant to Section 1816 of the Energy Policy Act of 2005 (August 2006) | Department of Energy Using Mobile Transformers and Mobile Substations for Rapidly Restoring Electrical Service: a Report to the United States Congress Pursuant to Section 1816 of the Energy Policy Act of 2005 (August 2006) Benefits of Using Mobile Transformers and Mobile Substations for Rapidly Restoring Electrical Service: a Report to the United

  18. PP&L experience with substation reliability centered maintenance

    SciTech Connect (OSTI)

    Santarelli, P.D.

    1996-08-01

    This paper is intended to present a summary of Pennsylvania Power & Light`s (PP&L) experience with substation Reliability Centered Maintenance (RCM). The purpose of this summary is to first explain the process used by PP&L to implement substation RCM, second to explain the differences that are apparent from the use of the classical RCM analysis as compared to the method used by PP&L, and third to provide several insights into the process.

  19. National SCADA Test Bed Substation Automation Evaluation Report

    SciTech Connect (OSTI)

    Kenneth Barnes; Briam Johnson

    2009-10-01

    Increased awareness of the potential for cyber attack has recently resulted in improved cyber security practices associated with the electrical power grid. However, the level of practical understanding and deployment of cyber security practices has not been evenly applied across all business sectors. Much of the focus has been centered on information technology business centers and control rooms. This report explores the current level of substation automation, communication, and cyber security protection deployed in electrical substations throughout existing utilities in the United States. This report documents the evaluation of substation automation implementation and associated vulnerabilities. This evaluation used research conducted by Newton-Evans Research Company for some of its observations and results. The Newton Evans Report aided in the determination of what is the state of substation automation in North American electric utilities. Idaho National Laboratory cyber security experts aided in the determination of what cyber vulnerabilities may pose a threat to electrical substations. This report includes cyber vulnerabilities as well as recommended mitigations. It also describes specific cyber issues found in typical substation automation configurations within the electric utility industry. The evaluation report was performed over a 5-month period starting in October 2008

  20. The role of the digital fault recorder in the automated substation

    SciTech Connect (OSTI)

    Brandt, J.D.

    1996-10-01

    This paper addresses the role of the digital fault recorder in the automated substation. The topics of the paper include distributed architecture, the substation LAN and reduced installation costs, multiple functions, improved substation intelligence, record generation and record merging, fault summaries, master station software, and future considerations.

  1. Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1990-07-01

    The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

  2. Experience in the installation of a microprocessor system for controlling converter units of the Vyborg substation

    SciTech Connect (OSTI)

    Gusakovskii, K. B.; Zmaznov, E. Yu.; Katantsev, S. V.; Mazurenko, A. K.; Mestergazi, V. A.; Prochan, G. G.; Funtikova, S. F.

    2006-01-15

    The experience in the installation of modern digital systems for controlling converter units at the Vyborg converter substation on the basis of advanced microprocessor devices is considered. It is shown that debugging of a control and protection system on mathematical and physical models does not guarantee optimum control of actual converter devices. Examples of advancing the control and protection system are described, the necessity for which has become obvious in tests of actual equipment. Comparison of oscillograms of processes before optimization of the control system and after its optimization and adjustment shows that the digital control system makes it possible to improve substantially the algorithms of control and protection in the short term and without changing the hardware component.

  3. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  4. AC Transit

    Broader source: Energy.gov [DOE]

    AC Transit (or the Alameda-Contra Costa Transit District) is based in Oakland, California, and provides transportation services to the East Bay of San Francisco. The 360-square-mile service area includes 13 cities and adjacent unincorporated areas in Alameda and Contra Costa counties. AC Transit's approximately 638 vehicles serve more than 65 million annual passengers.

  5. Substation based data interpretation techniques for improved power system management

    SciTech Connect (OSTI)

    Booth, C.; McDonald, J.R.; Laycock, W.J.

    1997-04-01

    There is now considerable pressure on electric utilities to operate their systems in the most efficient manner possible and to provide increased quality of service to customers. This pressure, coupled with the decreasing availability of reserve margins dictates that there is a requirement for comprehensive system operation support through, among other things, the provision of quality information relating to the behavior of the primary and secondary systems. This paper will show how the data available within modern substation control and management systems can be exploited in a cost-effective manner, through the implementation of advanced substation functions in an open systems environment. Certain functions which are presently carried out at the control center could be distributed (or partially distributed) to the substation. These functions may provide the utility staff with quality information, which can in turn be used to satisfy the objectives of increasing quality and security of supply, in addition to optimizing the utility`s information, maintenance and asset management functions.

  6. AC power systems handbook

    SciTech Connect (OSTI)

    Whitaker, J.

    1991-01-01

    Transient disturbances are what headaches are made of. Whatever you call them-spikes, surges, are power bumps-they can take your equipment down and leave you with a complicated and expensive repair job. Protection against transient disturbances is a science that demands attention to detail. This book explains how the power distribution system works, what can go wrong with it, and how to protect a facility against abnormalities. system grounding and shielding are covered in detail. Each major method of transient protection is analyzed and its relative merits discussed. The book provides a complete look at the critical elements of the ac power system. Provides a complete look at the ac power system from generation to consumption. Discusses the mechanisms that produce transient disturbances and how to protect against them. Presents diagrams to facilitate system design. Covers new areas, such as the extent of the transient disturbance problem, transient protection options, and stand-by power systems.

  7. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  8. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  9. SAS Output

    U.S. Energy Information Administration (EIA) Indexed Site

    -- -- -- -- -- -- -- 1.00 1.00 Fire -- -- -- -- -- -- -- -- -- Vandalism, Terrorism, or Malicious Acts -- -- -- -- 2.00 -- -- -- 2.00 Failed AC Substation Equipment --...

  10. Use of Static Compensators for Voltage Control at 330- and 500-kV Substations

    SciTech Connect (OSTI)

    Dement'ev, Yu. A.; Kochkin, V. I.; Idiatullov, R. M.; Papafanasopulo, S. G.; Smirnov, A. A.; Smirnov, S. G.

    2003-05-15

    A scheme for compensating the reactive power and controlling the voltage of high-voltage, intermediate-voltage, and low-voltage buses of 330 - 500-kV substations, which consist of static thyristor compensators (STC) on low-voltage autotransformers and controlled shunting reactors on high-voltage lines, is presented. It is shown that the STC can be created step-by-step beginning with the reactive part on substations with low-loaded lines. Results of installation of reactor groups of STC stepwise-controlled by vacuum switches at 330- and 500-kV substations are presented. Tests of the reactor groups have proved their high efficiency.

  11. THURSDAY: Deputy Secretary of Energy to Visit Western Area Power Administration Transmission Substation

    Broader source: Energy.gov [DOE]

    Deputy Secretary of Energy Elizabeth Sherwood-Randall will visit the Western Area Power Administration for a ceremony at the Electrical District No. 5 Substation to view progress on the Electrical District 5-to-Palo Verde transmission project.

  12. A simple approach to improve lightning performance of an uprated substation

    SciTech Connect (OSTI)

    Harrington, R.J.; Mueen, M.

    1996-07-01

    This paper presents a simple method to minimize lightning surges entering an uprated or compact substation. A severe lightning stress is caused by a backflashover in close proximity to the substation. Feasibility of uprating is based on the surge arrester technology available at present. However, some aspects of line design offer opportunities in reducing frequency and severity of lightning surges imposed on the substation. The tower surge response adds an inductive overshoot only during the front of the stroke which reduces considerably during the tail. If backflashover does not occur before reflections from adjacent towers arrive, it is unlikely to occur at all. Use of guys and underbuilt ground wires in the limiting distance will produce reflections with larger magnitude and reduce the effective surge impedance of the tower. This would not only reduce backflashover frequency but will also minimize crest and duration of surges entering the substation.

  13. Electrical substation service-area estimation using Cellular Automata: An initial report

    SciTech Connect (OSTI)

    Fenwick, J.W.; Dowell, L.J.

    1998-07-01

    The service areas for electric power substations can be estimated using a Cellular Automata (CA) model. The CA model is a discrete, iterative process whereby substations acquire service area by claiming neighboring cells. The service area expands from a substation until a neighboring substation service area is met or the substation`s total capacity or other constraints are reached. The CA-model output is dependent on the rule set that defines cell interactions. The rule set is based on a hierarchy of quantitative metrics that represent real-world factors such as land use and population density. Together, the metrics determine the rate of cell acquisition and the upper bound for service area size. Assessing the CA-model accuracy requires comparisons to actual service areas. These actual service areas can be extracted from distribution maps. Quantitative assessment of the CA-model accuracy can be accomplished by a number of methods. Some are as simple as finding the percentage of cells predicted correctly, while others assess a penalty based on the distance from an incorrectly predicted cell to its correct service area. This is an initial report of a work in progress.

  14. ACS | Open Energy Information

    Open Energy Info (EERE)

    ACS Jump to: navigation, search Name: ACS Place: Madrid, Spain Zip: 28036 Sector: Solar Product: Madrid based construction company involved in the development of solar thermal...

  15. Vehicle Technologies Office: AVTA - Electric Vehicle Charging Equipment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EVSE) Testing Data | Department of Energy Charging Equipment (EVSE) Testing Data Vehicle Technologies Office: AVTA - Electric Vehicle Charging Equipment (EVSE) Testing Data Electric vehicle chargers (otherwise known as Electric Vehicle Supply Equipment - EVSE) are a fundamental part of the plug-in electric vehicle system. Currently, there are three major types of EVSE: AC Level 1, AC Level 2, and DC Fast Charging. For an overview of the types of EVSE, see the Alternative Fuel Data Center's

  16. Substations reliability-centered maintenance and predictive maintenance - a strategic partnership

    SciTech Connect (OSTI)

    Colsher, R.J.; Abbott, P.D.; Matusheski, R.L.; Smith, S.B.

    1996-08-01

    A maintenance optimization study for substation components can be most effective when Reliability Centered Maintenance (RCM) Analysis is combined with a Predictive Maintenance (PDM) Assessment. If the two processes are performed concurrently, the benefit-to-cost ratios for each is increased. Also, the cost of implementing RCM recommendations for condition monitoring can be minimized, while maximizing their impact at the same time. This paper presents the essential elements of both the RCM and PDM processes, and describes how they work together in a substation environment as a comprehensive maintenance assessment tool. Descriptions of recent experiences are also included.

  17. EA-2013: Herbicide Application at Three Substations; Imperial County (California), Maricopa and Yuma Counties (Arizona)

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration (Western) and the Bureau of Land Management (BLM) prepared an EA that analyzes the potential environmental impacts of Western’s proposed use of selected herbicides for the treatment of undesirable vegetation within three existing substations on lands administered by BLM.

  18. Level 1 Accident Report of the March 1, 2010 Bobcat Fatality at BPA's White Bluffs Substation

    Broader source: Energy.gov [DOE]

    On March 2, 2010 at the request of the Bonneville Power Administration (BPA) Chief Safety Officer, a Level I Accident Investigation was convened to investigate an accident in which a supplemental labor contractor was fatally injured in a Bobcat/backhoe accident at the White Bluffs Substation near Richland, Washington on March 1, 2010.

  19. Puget Sound Area Electric Reliability Plan : Supplemental Environmental Analysis, Schultz Substation.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-04-01

    This document describes the purpose, function, and the environmental consequences of the proposed Schultz substation near Ellensburg, Washington. The affected environment is described in detail, including aerial survey photographs. The impacts on vegetation, fish and wildlife, soils, and water resources are described. (GHH)

  20. ETA-AC004

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of Test Results Prepared by Electric Transportation Applications Prepared by: ... Appendices Appendix A - Test Results Review and Approval Form 11 Procedure ETA-AC004 ...

  1. ETA-AC003

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preparation and Issuance of Test Reports Prepared by Electric Transportation Applications ... Review and approval of test documentation shall be in accordance with ETA-AC004, "Review ...

  2. Design-Build Contract Awarded for Electrical Substation at Los Alamos

    National Nuclear Security Administration (NNSA)

    National Laboratory | National Nuclear Security Administration | (NNSA) Design-Build Contract Awarded for Electrical Substation at Los Alamos National Laboratory April 27, 2016 LOS ALAMOS, NM - Under an interagency agreement with the Department of Energy's National Nuclear Security Administration (DOE/NNSA), the U.S. Army Corps of Engineers (USACE) has awarded a design-build contract at Los Alamos National Laboratory (LANL) to Gardner Zemke Mechanical and Electrical Contractors of

  3. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado.

  4. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  5. Laboratory Equipment Donation Program - Equipment Applications

    Office of Scientific and Technical Information (OSTI)

    Select the "Search Equipment" menu link. Enter the type of equipment desired into the search box or choose the "Equipment List" link, which will allow you see a complete list of ...

  6. Laboratory Equipment Donation Program - Equipment List

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Equipment List Already know the item control number? Submit Reset Item Control Number Equipment Name Date Entered Condition Picture 89022961820152 75164 VACUUM CONDENSER 07272016 ...

  7. Laboratory Equipment Donation Program - Equipment Information

    Office of Scientific and Technical Information (OSTI)

    Before you Apply, please Print This Page for your records Equipment Details No Package found. Item Control Number: Equipment Type: Condition: Date Entered: (you have 30 days from ...

  8. Laboratory Equipment Donation Program - Equipment Information

    Office of Scientific and Technical Information (OSTI)

    Before you Apply, please Print This Page for your records Equipment Details No Package found. Item Control Number: Equipment Type: Condition: Date Entered: (you have 30 days from this date to acquire equipment) Manufacturer: Make: Model: FSC Number: Detailed Description: Location of Equipment: Address Line 2: Address Line 3: City: State: Zip: Contact: Phone: Fax: Email address: Quantity: Original Acquisition Cost: $0.00

  9. SF 6110-AC Residual Inventory of Material or Equipment Furnished...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Classified Information) (See below) Acquired Quantity Total Value Weight Remarks * NOTE: Description shall include DrawingSpecification No. and whether item is Classified, ...

  10. Refrigeration System Installation and Startup Procedures, and AC Equipment Efficiency

    SciTech Connect (OSTI)

    2010-04-16

    This information sheet describes a series of measurements to evaluate a cooling system: air flow, pressures, temperatures, humidity levels, and power draw.

  11. Microfabricated AC impedance sensor

    DOE Patents [OSTI]

    Krulevitch, Peter; Ackler, Harold D.; Becker, Frederick; Boser, Bernhard E.; Eldredge, Adam B.; Fuller, Christopher K.; Gascoyne, Peter R. C.; Hamilton, Julie K.; Swierkowski, Stefan P.; Wang, Xiao-Bo

    2002-01-01

    A microfabricated instrument for detecting and identifying cells and other particles based on alternating current (AC) impedance measurements. The microfabricated AC impedance sensor includes two critical elements: 1) a microfluidic chip, preferably of glass substrates, having at least one microchannel therein and with electrodes patterned on both substrates, and 2) electrical circuits that connect to the electrodes on the microfluidic chip and detect signals associated with particles traveling down the microchannels. These circuits enable multiple AC impedance measurements of individual particles at high throughput rates with sufficient resolution to identify different particle and cell types as appropriate for environmental detection and clinical diagnostic applications.

  12. ACS Symposium Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    224th ACS National Meeting Division of Analytical Chemistry Symposium on Chemical Science Using Synchrotron Radiation Wednesday, August 21, 2002 Sheraton, Boston, MA This symposium has been organized by the Division of Analytical Chemistry and co-sponsored by the Divisions of Biological Chemistry, Environmental Chemistry, Chemical Education, Geochemistry, and Inorganic Chemistry as part of the ACS Division of Analytical Chemistry Meeting held this year from August 18-22 in Boston, MA. Organized

  13. Line Equipment Operator

    Broader source: Energy.gov [DOE]

    There are several Line Equipment Operator positions located in Washington and Oregon. A successful candidate in this position will perform Line Equipment Operator work operating trucks and all...

  14. AC/RF Superconductivity

    SciTech Connect (OSTI)

    Ciovati, Gianluigi

    2015-02-01

    This contribution provides a brief introduction to AC/RF superconductivity, with an emphasis on application to accelerators. The topics covered include the surface impedance of normal conductors and superconductors, the residual resistance, the field dependence of the surface resistance, and the superheating field.

  15. Equipment | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Zeiss Axiovert 200 Optical Microscope Spark Cutter Fully Equipped Metallographic Laboratory Electropolisher Dimpler

  16. University of Delaware | CCEI Equipment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CCEI Equipment Click column headings to sort Type Equipment Details Institution Professor Type Equipment Details Institution Lab BACK TO TOP

  17. MECS 2006- Transportation Equipment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Manufacturing Energy and Carbon Footprint for Transportation Equipment (NAICS 336) Sector with Total Energy Input, October 2012 (MECS 2006)

  18. Model and simulation of a flywheel energy storage system at a utility substation using electro-magnetic transients programs

    SciTech Connect (OSTI)

    Weissbach, R.S.; Karady, G.G.; Farmer, R.G.

    1996-11-01

    A flywheel energy storage system for use as an uninterruptible power supply at a utility substation to replace electrochemical batteries has been modeled. The model is developed using the Electro-Magnetic Transients Program (EMTP). Models for the flywheel, permanent magnet (synchronous) motor/generator, rectifiers and inverter have been included. Transient response for loss of power and clearing of a short circuit fault, as well as variation of load voltage due to the flywheel spinning down, is presented.

  19. Holbrook Substation Superconductor Cable System, Long Island, New York Final Report

    SciTech Connect (OSTI)

    Maguire, James; McNamara, Joseph

    2010-06-25

    The LIPA Superconductor project broke ground on July 4, 2006, was first energized on April 22, 2008 (Earth Day) and was commissioned on June 25, 2008. Since commissioning, up until early March, 2009, there were numerous refrigeration events that impacted steady state operations. This led to the review of the alarms that were being generated and a rewrite of the program logic in order to decrease the hypersensitivity surrounding these alarms. The high temperature superconductor (HTS) cable was energized on March 5, 2009 and ran uninterrupted until a human error during a refrigeration system switchover knocked the cable out of the grid in early February 2010. The HTS cable was in the grid uninterrupted from March 5, 2009 to February 4, 2010. Although there have been refrigeration events (propagated mainly by voltage sags/surges) during this period, the system was able to automatically switch over from the primary to the backup refrigeration system without issue as required during this period. On February 4, 2010, when switching from the backup over to the primary refrigeration system, two rather than one liquid nitrogen pumps were started inadvertently by a human error (communication) causing an overpressure in the cable cooling line. This in turn activated the pressure relief valve located in the grounding substation. The cable was automatically taken out of the grid without any damage to the components or system as a result of signals sent from the AMSC control cabinet to the LIPA substation. The cable was switched back into the grid again on March 16, 2010 without incident and has been operational since that time. Since switching from the backup to the primary is not an automatic process, a recent improvement was added to the refrigeration operating system to allow remote commands to return the system from backup to primary cooling. This improvement makes the switching procedure quicker since travel to the site to perform this operation is no longer necessary and

  20. AC Propulsion | Open Energy Information

    Open Energy Info (EERE)

    Inc. is a California Corporation founded in 1992 to develop, manufacture, and license system and component technology for electric vehicle drive systems. References: AC...

  1. AC resistance measuring instrument

    DOE Patents [OSTI]

    Hof, P.J.

    1983-10-04

    An auto-ranging AC resistance measuring instrument for remote measurement of the resistance of an electrical device or circuit connected to the instrument includes a signal generator which generates an AC excitation signal for application to a load, including the device and the transmission line, a monitoring circuit which provides a digitally encoded signal representing the voltage across the load, and a microprocessor which operates under program control to provide an auto-ranging function by which range resistance is connected in circuit with the load to limit the load voltage to an acceptable range for the instrument, and an auto-compensating function by which compensating capacitance is connected in shunt with the range resistance to compensate for the effects of line capacitance. After the auto-ranging and auto-compensation functions are complete, the microprocessor calculates the resistance of the load from the selected range resistance, the excitation signal, and the load voltage signal, and displays of the measured resistance on a digital display of the instrument. 8 figs.

  2. AC Resistance measuring instrument

    DOE Patents [OSTI]

    Hof, Peter J.

    1983-01-01

    An auto-ranging AC resistance measuring instrument for remote measurement of the resistance of an electrical device or circuit connected to the instrument includes a signal generator which generates an AC excitation signal for application to a load, including the device and the transmission line, a monitoring circuit which provides a digitally encoded signal representing the voltage across the load, and a microprocessor which operates under program control to provide an auto-ranging function by which range resistance is connected in circuit with the load to limit the load voltage to an acceptable range for the instrument, and an auto-compensating function by which compensating capacitance is connected in shunt with the range resistance to compensate for the effects of line capacitance. After the auto-ranging and auto-compensation functions are complete, the microprocessor calculates the resistance of the load from the selected range resistance, the excitation signal, and the load voltage signal, and displays of the measured resistance on a digital display of the instrument.

  3. Laboratory Equipment Donation Program - Equipment List

    Office of Scientific and Technical Information (OSTI)

    Equipment List Already know the item control number? Submit Reset Item Control Number Equipment Name Date Entered Condition Picture 89022962080110 216969 LEPS HIGH PURITY GERMANIUM 08/16/2016 Repairable N/A 89022962080111 220131 DETECTOR GAMMA RAY 08/16/2016 Repairable N/A 89022962240034 220131 DETECTOR GAMMA RAY 08/31/2016 Repairable N/A 89022962170049 73415 CHROMATOGRAPHY SYSTEMS 08/24/2016 Repairable N/A 89022962170057 74147 THERMAL GAS CHROMATOGRAPH 08/24/2016 Repairable N/A 89022962170061

  4. New Emergency Equipment Notifications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notifications Addition of New Emergency Equipment, Hazardous Waste Facility Permit Number: NM4890139088-TSDF Todd A. Shrader/CBFO and Philip J. Breidenbach/NWP dated October 20, 2015 Underground Fire Suppression Vehicles (2) Addition of New Emergency Equipment, Hazardous Waste Facility Permit Number: NM4890139088-TSDF Dana C. Bryson/CBFO and Philip J. Breidenbach/NWP dated September 30, 2015 Underground Ambulance #3 Addition of New Emergency Equipment, Hazardous Waste Facility Permit Number:

  5. Digital ac monitor

    DOE Patents [OSTI]

    Hart, George W.; Kern, Jr., Edward C.

    1987-06-09

    An apparatus and method is provided for monitoring a plurality of analog ac circuits by sampling the voltage and current waveform in each circuit at predetermined intervals, converting the analog current and voltage samples to digital format, storing the digitized current and voltage samples and using the stored digitized current and voltage samples to calculate a variety of electrical parameters; some of which are derived from the stored samples. The non-derived quantities are repeatedly calculated and stored over many separate cycles then averaged. The derived quantities are then calculated at the end of an averaging period. This produces a more accurate reading, especially when averaging over a period in which the power varies over a wide dynamic range. Frequency is measured by timing three cycles of the voltage waveform using the upward zero crossover point as a starting point for a digital timer.

  6. Digital ac monitor

    DOE Patents [OSTI]

    Hart, G.W.; Kern, E.C. Jr.

    1987-06-09

    An apparatus and method is provided for monitoring a plurality of analog ac circuits by sampling the voltage and current waveform in each circuit at predetermined intervals, converting the analog current and voltage samples to digital format, storing the digitized current and voltage samples and using the stored digitized current and voltage samples to calculate a variety of electrical parameters; some of which are derived from the stored samples. The non-derived quantities are repeatedly calculated and stored over many separate cycles then averaged. The derived quantities are then calculated at the end of an averaging period. This produces a more accurate reading, especially when averaging over a period in which the power varies over a wide dynamic range. Frequency is measured by timing three cycles of the voltage waveform using the upward zero crossover point as a starting point for a digital timer. 24 figs.

  7. Heavy Mobile Equipment Mechanic

    Broader source: Energy.gov [DOE]

    Join the Bonneville Power Administration (BPA) for a challenging and rewarding career, while working, living, and playing in the Pacific Northwest. The Heavy Mobile Equipment Mechanic (HMEM)...

  8. PECO energy adopts reliability centered maintenance to improve preventive maintanance of power delivery equipment

    SciTech Connect (OSTI)

    Maurer, R.; Linn, P.; Termine, G.; Schwan, C.

    1996-08-01

    One of the biggest challenges facing PECO Energy, in the area of power delivery, is holding the line on maintenance costs while preserving high levels of worker safety, enhancing equipment reliability, and improving customer satisfaction. PECO has taken an early lead in tackling this apparent industry-wide problem by adopting a proven preventive maintenance (PM) optimization method known as Reliability Centered Maintenance (RCM). The purpose of this paper is to explain: (1) how RCM was successfully introduced at PECO using data, lessons learned and consulting support associated with EPRI`s RCM for Substations research project; (2) how the RCM methodology will be implemented over the long term for the Power Delivery System; and (3) how the RCM activities will help lead to the development of a living PM program that will foster a continuous improvement in equipment reliability through cost-effective preventive maintenance.

  9. Troubleshooting rotating equipment

    SciTech Connect (OSTI)

    Wong, R.F. )

    1992-10-01

    This paper reports that equipment problems in a Peruvian refinery illustrate the process engineer's role as a troubleshooter. Examples show that rotating equipment problems can stem from mechanical or process factors and involve both inspection/maintenance specialists and process engineers.

  10. Ac traction gets on track

    SciTech Connect (OSTI)

    O`Connor, L.

    1995-09-01

    This article describes inverter-based ac traction systems which give freight locomotives greater adhesion, pulling power, and braking capacity. In the 1940s, dc traction replaced the steam engine as a source of train propulsion, and it has ruled the freight transportation industry ever since. But now, high-performance ac-traction systems, with their unprecedented levels of pulling power and adhesion, are becoming increasingly common on America`s freight railroads. In thousands of miles of demonstration tests, today`s ac-traction systems have outperformed traditional dc-motor driven systems. Major railroad companies are convinced enough of the benefits of ac traction to have integrated it into their freight locomotives.

  11. The results of systems tests of the 500 kV busbar controllable shunting reactor in the Tavricheskaya substation

    SciTech Connect (OSTI)

    Gusev, S. I.; Karpov, V. N.; Kiselev, A. N.; Kochkin, V. I.

    2009-09-15

    The results of systems tests of the 500 kV busbar magnetization-controllable shunting reactor (CSR), set up in the Tavricheskaya substation, including measurements of the quality of the electric power, the harmonic composition of the network currents of the reactor for different values of the reactive power consumed, the determination of the regulating characteristics of the reactor, the speed of response of the shunting reactor in the current and voltage stabilization modes, and also the operation of the reactor under dynamic conditions for different perturbations, are presented. The results obtained are analyzed.

  12. Solar Equipment Certification

    Broader source: Energy.gov [DOE]

    Under the Solar Energy Standards Act of 1976, the Florida Solar Energy Center (FSEC) is responsible for certifying all solar equipment sold in Florida. A manufacturer who wishes to have their solar...

  13. Appliance and Equipment Standards

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Standards April 22, 2014 John Cymbalsky Program Manager 1 | Energy Efficiency and Renewable Energy eere.energy.gov 2 Appliance & Equipment Standards Mission The Appliance and Equipment Standards Program's Mission to Fulfill its Statutory Obligation to: * Develop and amend energy conservation standards that achieve the maximum energy efficiency that is technologically feasible and economically justified. * Develop and amend test procedures that are repeatable, reproducible, representative,

  14. Hydrogen Equipment Certification Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Equipment Certification Guide U.S. Department of Energy Fuel Cell Technologies Office December 10 th , 2015 Presenter: Nick Barilo Pacific Northwest National Laboratory (PNNL) Hydrogen Safety Program Manager DOE Host: Will James - DOE Fuel Cell Technologies Office 2 | Fuel Cell Technologies Office eere.energy.gov Question and Answer * Please type your questions into the question box 2 / / Hydrogen Equipment Certification Guide: Introduction and Kickoff for the Stakeholder Review Nick Barilo PNNL

  15. Volume II solicitation package for solicitation no. 522887-5422 {open_quotes}site electrical replacements & substation{close_quotes} subproject: 69 KV substation

    SciTech Connect (OSTI)

    1991-05-03

    This solicitation is for the U.S. Department of Energy under Prime Contract No. DE-AC04-88-DP43495 with EG&G Mound Applied Technologies. Ohio Sales or Use taxes are not to be included in the proposal price. Applicable taxes due or owing to the State of Ohio will be paid by the buyer under Direct Payment Permit No. 98-002230. Refer to Form ML-2487, General Provisions, Article 24, {open_quotes}Federal, State & Local Taxes{close_quotes}. Sellers are advised that purchases of building and construction materials for incorporation into a structure or improvement to a real property which is accepted for ownership by the United States or one of its agencies are exempt from Ohio Sales and Use taxes. Unnecessarily elaborate brochures or other presentations beyond those sufficient to present a complete and effective response to this solicitation are not desired and may be construed as an indication of the seller`s lack of cost consciousness. Elaborate art work, expensive paper and binding, and expensive visual and other presentation aids are neither necessary nor wanted.

  16. Laboratory Equipment Donation Program - Guidelines

    Office of Scientific and Technical Information (OSTI)

    ... What equipment is available under the LEDP program? Examples of typical items of educational training apparatus or equipment that may be requested are listed below. It should be ...

  17. Health Care Buildings: Equipment Table

    U.S. Energy Information Administration (EIA) Indexed Site

    Equipment Table Buildings, Size and Age Data by Equipment Types for Health Care Buildings Number of Buildings (thousand) Percent of Buildings Floorspace (million square feet)...

  18. Equipment Operational Requirements

    SciTech Connect (OSTI)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  19. Emergency Facilities and Equipment

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    This volume clarifies requirements of DOE O 151.1 to ensure that emergency facilities and equipment are considered as part of emergency management program and that activities conducted at these emergency facilities are fully integrated. Canceled by DOE G 151.1-4.

  20. Sandia National Laboratories: Supported Equipment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Supported Equipment Alt text This list of PSL supported equipment identifies the electrical Measuring and Test Equipment (M&TE) for which the Primary Standards Laboratory has either developed a calibration procedure or identified a commercial calibration source. Calibration of equipment that is not listed may take additional time and resources. Please contact the PSL at 845-8855 for additional information.

  1. 1997RMxAC...6..151L

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RMxAC...6..151L 1997RMxAC...6..151L 1997RMxAC...6..151L

  2. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-AC05-06OR23100 Modification No. 507 11 PART I - THE SCHEDULE SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS B.1 ITEMS BEING ACQUIRED (ALTERNATE I) (OCT 2004) The Contractor shall furnish all personnel, facilities, equipment, material, supplies, and services (except as may be expressly set forth in this contract as furnished by the Government) and otherwise do all things necessary for, or incident to, the performance and provision of the following items of work: Item 1 - See Section C, Clause

  3. AC Solar Inc | Open Energy Information

    Open Energy Info (EERE)

    Solar Inc Jump to: navigation, search Logo: AC Solar Inc Name: AC Solar Inc Address: P.O. Box 128 Place: Florence, Colorado Zip: 81226 Region: Rockies Area Sector: Solar Product:...

  4. Maintaining gas cooling equipment

    SciTech Connect (OSTI)

    Rector, J.D.

    1997-05-01

    An often overlooked key to satisfactory operation and longevity of any mechanical device is proper operation and maintenance in accordance with the manufacturer`s written instructions. Absorption chillers, although they use a different technology than the more familiar vapor compression cycle to produce chilled water, operate successfully in a variety of applications if operated and maintained properly. Maintenance procedures may be more frequent than those required for vapor compression chillers, but they are also typically less complex. The goal of this article is to describe the basic operation of an absorption chiller to provide an understanding of the relatively simple tasks required to keep the machine operating at maximum efficiency for its design life and beyond. A good starting point is definitions. Gas cooling equipment is generally defined as alternative energy, non-electric cooling products. This includes absorption chillers, engine-drive chillers and packaged desiccant units, among others. Natural gas combustion drives the equipment.

  5. Secure authenticated video equipment

    SciTech Connect (OSTI)

    Doren, N.E.

    1993-07-01

    In the verification technology arena, there is a pressing need for surveillance and monitoring equipment that produces authentic, verifiable records of observed activities. Such a record provides the inspecting party with confidence that observed activities occurred as recorded, without undetected tampering or spoofing having taken place. The secure authenticated video equipment (SAVE) system provides an authenticated series of video images of an observed activity. Being self-contained and portable, it can be installed as a stand-alone surveillance system or used in conjunction with existing monitoring equipment in a non-invasive manner. Security is provided by a tamper-proof camera enclosure containing a private, electronic authentication key. Video data is transferred communication link consisting of a coaxial cable, fiber-optic link or other similar media. A video review station, located remotely from the camera, receives, validates, displays and stores the incoming data. Video data is validated within the review station using a public key, a copy of which is held by authorized panics. This scheme allows the holder of the public key to verify the authenticity of the recorded video data but precludes undetectable modification of the data generated by the tamper-protected private authentication key.

  6. DOE 10 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comments by Howe Corporation | Department of Energy 0 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission of Comments by Howe Corporation DOE 10 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission of Comments by Howe Corporation Comments to the following DOE Proposed Rules: 10 CFR Part 431 [Docket No. EERE-2010-BT-TP-0036] RIN 1904-AC38 Energy Efficiency Program for Certain Commercial and Industrial Equipment: Test Procedures for Automatic Commercial Ice Makers

  7. Simultaneous distribution of AC and DC power

    SciTech Connect (OSTI)

    Polese, Luigi Gentile

    2015-09-15

    A system and method for the transport and distribution of both AC (alternating current) power and DC (direct current) power over wiring infrastructure normally used for distributing AC power only, for example, residential and/or commercial buildings' electrical wires is disclosed and taught. The system and method permits the combining of AC and DC power sources and the simultaneous distribution of the resulting power over the same wiring. At the utilization site a complementary device permits the separation of the DC power from the AC power and their reconstruction, for use in conventional AC-only and DC-only devices.

  8. Agricultural Equipment Technology Conference

    Broader source: Energy.gov [DOE]

    The 20th Agricultural Equipment Technology Conference will be held Feb. 8–10, 2016, in Louisville, Kentucky. The conference will bring together professionals and experts in the agricultural and biological engineering fields. Bioenergy Technologies Office (BETO) Terrestrial Feedstocks Technology Manager Sam Tagore will be in attendance. Mr. Tagore will moderate a technical session titled “Ash Reduction Strategies for Improving Biomass Feedstock Quality.” The session will include presentations by researchers from Idaho National Laboratory and Oak Ridge National Laboratory supporting BETO, as well as from university and industry.

  9. Energy Conservation Program of the Division of Substation and Control Engineering : An Interim Report.

    SciTech Connect (OSTI)

    ,

    1981-04-01

    Energy conservation projects undertaken by BPA that could benefit residential and commercial users and development of prototype equipment are described. Progress reports are presented and directions that the projects will take are indicated. The first projects presented are those being done at BPA's Midway Residential Community: studies on air infiltration and weatherization, and evaluation of such energy conservation measures as heat pump and solar water heaters. The next section involves an energy audit and retrofit program undertaken to reduce energy consumption in BPA's own buildings. The third section, also concerned with BPA's efforts to reduce internal energy consumption, presents the application of passive solar techniques to the design of new BPA buildings. The fourth section reports on a system developed to utilize waste thermal energy from transformers and solar energy for space heating and cooling. The fifth section also involves the development of a prototype system, one to monitor energy usage of industrial equipment. The final sections report on projects involving solar and wind energy, the Photovoltaic Applications Program, and the Mod-2 Wind Generator project at Goodnoe Hills. (MCW)

  10. Equipment Specialist | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Equipment Specialist Equipment Specialist Submitted by admin on Sat, 2016-01-16 00:16 Job Summary Organization Name Department Of Energy Agency SubElement Bonneville Power...

  11. LDRD report: Smoke effects on electrical equipment

    SciTech Connect (OSTI)

    TANAKA,TINA J.; BAYNES JR.,EDWARD E.; NOWLEN,STEVEN P.; BROCKMANN,JOHN E.; GRITZO,LOUIS A.; SHADDIX,CHRISTOPHER R.

    2000-03-01

    Smoke is known to cause electrical equipment failure, but the likelihood of immediate failure during a fire is unknown. Traditional failure assessment techniques measure the density of ionic contaminants deposited on surfaces to determine the need for cleaning or replacement of electronic equipment exposed to smoke. Such techniques focus on long-term effects, such as corrosion, but do not address the immediate effects of the fire. This document reports the results of tests on the immediate effects of smoke on electronic equipment. Various circuits and components were exposed to smoke from different fields in a static smoke exposure chamber and were monitored throughout the exposure. Electrically, the loss of insulation resistance was the most important change caused by smoke. For direct current circuits, soot collected on high-voltage surfaces sometimes formed semi-conductive soot bridges that shorted the circuit. For high voltage alternating current circuits, the smoke also tended to increase the likelihood of arcing, but did not accumulate on the surfaces. Static random access memory chips failed for high levels of smoke, but hard disk drives did not. High humidity increased the conductive properties of the smoke. The conductivity does not increase linearly with smoke density as first proposed; however, it does increase with quantity. The data can be used to give a rough estimate of the amount of smoke that will cause failures in CMOS memory chips, dc and ac circuits. Comparisons of this data to other fire tests can be made through the optical and mass density measurements of the smoke.

  12. Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. [Forbes Substation

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company's (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP's original amendment request remain valid.

  13. Equipment Pool | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pool What is the Equipment Pool? Property that is no longer required or being used by a research group or administrative office is sent to the Ames Laboratory's warehouse Equipment Pool area for reuitilization within the Laboratory. What property is in the Equipment Pool? 1. Visit the Equipment Pool Listing page, or 2. Visit our Ames Laboratory warehouse between the hours of 7:30-4 p.m. to view the items in the equipment pool. How do I request property from the Pool? Contact Brian Aspengren,

  14. Development of a low cost integrated 15 kW A.C. solar tracking sub-array for grid connected PV power system applications

    SciTech Connect (OSTI)

    Stern, M.; West, R.; Fourer, G.; Whalen, W.; Van Loo, M.; Duran, G.

    1997-02-01

    Utility Power Group has achieved a significant reduction in the installed cost of grid-connected PV systems. The two part technical approach focused on (1) The utilization of a large area factory assembled PV panel, and (2) The integration and packaging of all sub-array power conversion and control functions within a single factory produced enclosure. Eight engineering prototype 15kW ac single axis solar tracking sub-arrays were designed, fabricated, and installed at the Sacramento Municipal Utility District{close_quote}s Hedge Substation site in 1996 and are being evaluated for performance and reliability. A number of design enhancements will be implemented in 1997 and demonstrated by the field deployment and operation of over twenty advanced sub-array PV power systems. {copyright} {ital 1997 American Institute of Physics.}

  15. Type B Accident Investigation of the Serious Personal Injury while Doble Testing at the Western Area Power Administration Hayden Substation, May 19, 1999

    Broader source: Energy.gov [DOE]

    On May 19, 1999, at 10:31 a.m., four Western Area Power Administration (Western) employees were performing Doble testing on a circuit breaker at Hayden Substation in Routt County, Colorado. Three electricians were injured when the high-voltage lead (HVL) of the Doble test set encroached on the minimum approach distance to an energized part outside clearance boundaries, drawing arcing faults.

  16. Puerto Rico - Renewable Energy Equipment Certification | Department...

    Broader source: Energy.gov (indexed) [DOE]

    State Puerto Rico Program Type Equipment Certification Summary Certification of Photovoltaic Equipment EAA specifies that PV equipment must meet UL 1703 requirements, and...

  17. Electric Vehicle Supply Equipment (EVSE) Test Report: AeroVironment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    pROGRAM Electric Vehicle Supply Equipment (EVSE) Test Report: AeroVironment EVSE Features LED status light EVSE Specifcations Grid connection Hardwired Connector type J1772 Test lab certifcations UL, cUL, CE, CTick listed Approximate size (H x W x D inches) 12 x 12 x 8 Charge level AC Level 2 Input voltage 208VAC to 240 VAC Maximum input current 30 Amp Circuit breaker rating 40 Amp Test Conditions 1 Test date 1/31/2012 Nominal supply voltage (Vrms) 235.68 Supply frequency (Hz) 60.00 Initial

  18. Electric Vehicle Supply Equipment (EVSE) Test Report: Voltec 240V

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VEhICLE TEChNOLOgIES pROgRAm Electric Vehicle Supply Equipment (EVSE) Test Report: Voltec 240V EVSE Features Integrated Flashlight 25ft of coiled cable Auto-reset EVSE Specifcations Grid connection Hardwired Connector type J1772 Test lab certifcations ETL Listed Approximate size (H x W x D inches) 10 x 15 x 5 Charge level AC Level 2 Input voltage 208 / 240 VAC Maximum input current 15 Amp Circuit breaker rating 20 Amp Test Conditions 1 Test date 3/29/2012 Nominal supply voltage (Vrms) 243.11

  19. Equipment Loans | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Loans Requirements to Loan Property: Ames Laboratory may loan Government Property provided the equipment is not excess to the Laboratory's needs. In order to loan equipment, the following criteria must be met: 1) Equipment shall be used in performing research, studies, and other efforts that result in benefits to both the U.S. Government, the borrower, and provided that the DOE mission is not affected. 2) Used by another DOE organization, contractor, Government agency, or organization that has a

  20. LANSCE | Lujan Center | Ancillary Equipment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ancillary Equipment For general questions, please contact the Lujan Center Sample Environments responsible: Victor Fanelli | vfanelli@lanl.gov | 505.667.8755 Sample and Equipment Shipping Instructions For questions regarding shipping procedures, contact the Lujan Center Experiment Coordinator: TBA Low Temperature Equipment Specifications Flight Path/Instrument Compatibility Responsible Displex closed-cycle refrigerators Tmin= 4 K to 12 K Tmax= 300 K to 340 K 11 - Asterix 04 - HIPPO 03 - HIPD 10

  1. Equipment Certification | Open Energy Information

    Open Energy Info (EERE)

    Fuel Cells Geothermal Electric Hydroelectric energy Hydroelectric (Small) Natural Gas Nuclear Solar Photovoltaics Tidal Energy Wave Energy Wind energy Yes Madison - Equipment...

  2. Information technology equipment cooling system

    DOE Patents [OSTI]

    Schultz, Mark D.

    2014-06-10

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

  3. Commercial Kitchen Equipment Rebate Program

    Broader source: Energy.gov [DOE]

    Efficiency Vermont offers rebates for ENERGY STAR certified fryers, griddles, convection ovens, and steam cookers. Custom rebates for other types of commercial cooking equipment may be available...

  4. Webinar: Hydrogen Equipment Certification Guide

    Broader source: Energy.gov [DOE]

    The Fuel Cell Technologies Office will present a live webinar titled "Hydrogen Equipment Certification Guide" on Thursday, December 10, from 1 to 2 p.m. EST.

  5. INL '@work' heavy equipment mechanic

    SciTech Connect (OSTI)

    Christensen, Cad

    2008-01-01

    INL's Cad Christensen is a heavy equipment mechanic. For more information about INL careers, visit http://www.facebook.com/idahonationallaboratory.

  6. INL '@work' heavy equipment mechanic

    ScienceCinema (OSTI)

    Christensen, Cad

    2013-05-28

    INL's Cad Christensen is a heavy equipment mechanic. For more information about INL careers, visit http://www.facebook.com/idahonationallaboratory.

  7. Information technology equipment cooling method

    DOE Patents [OSTI]

    Schultz, Mark D.

    2015-10-20

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools air utilized by the rack of information technology equipment to cool the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat generated by the rack of information technology equipment.

  8. Review of Site Preparedness for Severe Natural Phenomena Events...

    Office of Environmental Management (EM)

    substations at the facilities, which reduce power to various AC voltages providing a dual loop power supply. In Idaho Falls, separate substations provide commercial power at...

  9. Solar Electric Grid Integration - Advanced Concepts (SEGIS-AC...

    Energy Savers [EERE]

    Electric Grid Integration - Advanced Concepts (SEGIS-AC) Funding Opportunity Solar Electric Grid Integration - Advanced Concepts (SEGIS-AC) Funding Opportunity Through the Solar ...

  10. Solar Electric Grid Integration - Advanced Concepts (SEGIS-AC...

    Energy Savers [EERE]

    Solar Electric Grid Integration - Advanced Concepts (SEGIS-AC) Funding Opportunity Solar Electric Grid Integration - Advanced Concepts (SEGIS-AC) Funding Opportunity Through the ...

  11. ac_household2001.pdf

    U.S. Energy Information Administration (EIA) Indexed Site

    0a. Air Conditioning by Midwest Census Region, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total U.S. Midwest Census Region RSE Row Factors Total Census Division East North Central West North Central 0.5 1.0 1.2 1.4 Households With Electric Air-Conditioning Equipment ...................... 82.9 20.5 13.6 6.8 2.2 Air Conditioners Not Used ........................... 2.1 0.3 Q Q 27.5 Households Using Electric Air-Conditioning 1

  12. ac_household2001.pdf

    U.S. Energy Information Administration (EIA) Indexed Site

    1a. Air Conditioning by South Census Region, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total U.S. South Census Region RSE Row Factors Total Census Division South Atlantic East South Central West South Central 0.5 0.8 1.2 1.3 1.4 Households With Electric Air-Conditioning Equipment ...................... 82.9 37.2 19.3 6.4 11.5 1.5 Air Conditioners Not Used ........................... 2.1 0.4 Q Q Q 28.2 Households Using Electric Air-Conditioning 1

  13. ac_household2001.pdf

    U.S. Energy Information Administration (EIA) Indexed Site

    2a. Air Conditioning by West Census Region, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total U.S. West Census Region RSE Row Factors Total Census Division Mountain Pacific 0.4 1.2 1.7 1.4 Households With Electric Air-Conditioning Equipment ...................... 82.9 10.7 3.4 7.2 7.1 Air Conditioners Not Used ........................... 2.1 1.1 0.2 0.9 15.5 Households Using Electric Air-Conditioning 1 ........................................ 80.8 9.6 3.2

  14. ac_household2001.pdf

    U.S. Energy Information Administration (EIA) Indexed Site

    4a. Air Conditioning by Type of Housing Unit, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Type of Housing Unit RSE Row Factors Single-Family Apartments in Buildings With Mobile Home Two to Four Units Five or More Units 0.4 0.6 1.5 1.4 1.8 Households With Electric Air-Conditioning Equipment ........ 82.9 58.7 6.5 12.4 5.3 4.9 Air Conditioners Not Used ............ 2.1 1.1 Q 0.6 Q 21.8 Households Using Electric Air-Conditioning 1

  15. ac_household2001.pdf

    U.S. Energy Information Administration (EIA) Indexed Site

    8a. Air Conditioning by Urban/Rural Location, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Urban/Rural Location 1 RSE Row Factors City Town Suburbs Rural 0.5 0.8 1.4 1.3 1.4 Households With Electric Air-Conditioning Equipment ...................... 82.9 36.8 13.6 18.9 13.6 4.3 Air Conditioners Not Used ........................... 2.1 1.2 0.2 0.4 0.3 21.4 Households Using Electric Air-Conditioning 2 ........................................ 80.8 35.6 13.4

  16. ac_household2001.pdf

    U.S. Energy Information Administration (EIA) Indexed Site

    9a. Air Conditioning by Northeast Census Region, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total U.S. Northeast Census Region RSE Row Factors Total Census Division Middle Atlantic New England 0.5 1.0 1.2 1.8 Households With Electric Air-Conditioning Equipment ...................... 82.9 14.5 11.3 3.2 3.3 Air Conditioners Not Used ........................... 2.1 0.3 0.3 Q 28.3 Households Using Electric Air-Conditioning 1

  17. Three phase AC motor controller

    DOE Patents [OSTI]

    Vuckovich, Michael; Wright, Maynard K.; Burkett, John P.

    1984-03-20

    A motor controller for a three phase AC motor (10) which is adapted to operate bidirectionally from signals received either from a computer (30) or a manual control (32). The controller is comprised of digital logic circuit means which implement a forward and reverse command signal channel (27, 29) for the application of power through the forward and reverse power switching relays (16, 18, 20, 22). The digital logic elements are cross coupled to prevent activation of both channels simultaneously and each includes a plugging circuit (65, 67) for stopping the motor upon the removal of control signal applied to one of the two channels (27, 29) for a direction of rotation desired. Each plugging circuit (65, 67) includes a one-shot pulse signal generator (88, 102) which outputs a single pulse signal of predetermined pulsewidth which is adapted to inhibit further operation of the application of power in the channel which is being activated and to apply a reversal command signal to the other channel which provides a reversed phase application of power to the motor for a period defined by the pulse-width output of the one-shot signal generator to plug the motor (10) which will then be inoperative until another rotational command signal is applied to either of the two channels.

  18. New Emergency Equipment Notifications 2016

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notifications 2016 Addition of New Emergency Equipment, Hazardous Waste Facility Permit Number: NM4890139088-TSDF Todd A. Shrader/CBFO and Philip J. Breidenbach/NWP dated January 8, 2016 Underground Fire Suppression Vehicles

  19. Appliance and Equipment Efficiency Standards

    Broader source: Energy.gov [DOE]

    Arizona’s Appliance and Equipment Efficiency Standards (Arizona Revised Statutes, Title 44, Section 1375) set minimum energy efficiency standards for twelve products, all of which have since been...

  20. MPC Equipment | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MPC Equipment The MPC utilizes a wide range of equipment designed for metallurgical or materials research. With capabilities from simple arc casting techniques, single crystal preparation, and VIM casting, to plasma spraying and high-pressure gas atomization the MPC can assist research groups in many areas. We house complete metallography, analytical, and characterization resources to complement our fabrication capabilities. All of our services are provided on a cost recovery basis. MPC

  1. Water-Using Equipment: Domestic

    SciTech Connect (OSTI)

    Solana, Amy E.; Mcmordie, Katherine

    2006-01-24

    Water management is an important aspect of energy engineering. This article addresses water-using equipment primarily used for household purposes, including faucets, showers, toilets, urinals, dishwashers, and clothes washers, and focuses on how the equipment can be optimized to save both water and energy. Technology retrofits and operation and maintenance changes are the primary methods discussed for water and energy conservation. Auditing to determine current consumption rates is also described for each technology.

  2. AC power | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for AC to DC converter that manages plasma in upgraded fusion machine The electric ... Without it, the magnetic coils the current drives cannot contain and shape the plasma that ...

  3. Template for Electronic Submission to ACS Journals

    Office of Scientific and Technical Information (OSTI)

    submission was sponsored by a contractor of the United States Government under contract DE-AC05-00OR22725 with the United States Department of Energy. The United States Government ...

  4. Template for Electronic Submission to ACS Journals

    Office of Scientific and Technical Information (OSTI)

    Notice of Copyright This manuscript has been authored by UT-Battelle, LLC under Contract No. DE-AC05-00OR22725 with the U.S. Department of Energy. The United States Government ...

  5. Webinar December 10: Hydrogen Equipment Certification Guide

    Broader source: Energy.gov [DOE]

    The Fuel Cell Technologies Office will present a live webinar titled "Hydrogen Equipment Certification Guide" on Thursday, December 10, from 1 to 2 p.m. EST. The webinar will introduce the Hydrogen Equipment Certification Guide, a document intended to aid in equipment approval until listed equipment are available for the entirety of equipment and components.

  6. 7AC Technologies, Inc. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7AC Technologies, Inc. America's Next Top Energy Innovator Challenge 498 likes 7AC Technologies, Inc. National Renewable Energy Laboratory Air conditioning is a very large contributor to U.S. and world energy consumption. Heating and cooling costs for commercial and industrial buildings exceed 25 percent of U.S. primary energy consumption (cooling alone accounts for 4.5 Quads out of 40 Quads) and typically accounts for almost half of a building's operating costs. Air conditioning is also a

  7. ac_household2001.pdf

    U.S. Energy Information Administration (EIA) Indexed Site

    2a. Air Conditioning by Year of Construction, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Year of Construction RSE Row Factors 1990 to 2001 1 1980 to 1989 1970 to 1979 1960 to 1969 1950 to 1959 1949 or Before 0.4 1.6 1.2 1.1 1.2 1.1 0.9 Households With Electric Air-Conditioning Equipment ........ 82.9 13.6 16.0 14.7 10.4 10.5 17.6 4.7 Air Conditioners Not Used ............ 2.1 Q 0.3 0.5 0.3 0.4 0.5 27.2 Households Using Electric Air-Conditioning 2

  8. ac_household2001.pdf

    U.S. Energy Information Administration (EIA) Indexed Site

    5a. Air Conditioning by Type of Owner-Occupied Housing Unit, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Owner- Occupied Units Type of Owner-Occupied Housing Unit RSE Row Factors Single-Family Apartments in Buildings With Mobile Home Two to Four Units Five or More Units 0.5 0.5 1.5 1.4 1.8 Households With Electric Air-Conditioning Equipment ........ 59.5 58.7 6.5 12.4 5.3 5.2 Air Conditioners Not Used ............ 1.2 1.1 Q 0.6 Q 23.3 Households Using

  9. ac_household2001.pdf

    U.S. Energy Information Administration (EIA) Indexed Site

    6a. Air Conditioning by Type of Rented Housing Unit, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Rented Units Type of Rented Housing Unit RSE Row Factors Single-Family Apartments in Buildings With Mobile Home Two to Four Units Five or More Units 0.8 0.5 1.4 1.2 1.6 Households With Electric Air-Conditioning Equipment ........ 23.4 58.7 6.5 12.4 5.3 6.1 Air Conditioners Not Used ............ 0.9 1.1 Q 0.6 Q 23.0 Households Using Electric Air-Conditioning

  10. ac_household2001.pdf

    U.S. Energy Information Administration (EIA) Indexed Site

    2001 Air Conditioning Characteristics RSE Column Factor: Total U.S. Four Most Populated States RSE Row Factors New York California Texas Florida 0.4 1.1 1.7 1.2 1.2 Households With Electric Air-Conditioning Equipment ...................... 82.9 4.9 6.0 7.4 6.2 2.4 Air Conditioners Not Used ........................... 2.1 0.1 0.8 Q 0.1 23.2 Households Using Electric Air-Conditioning 1 ........................................ 80.8 4.7 5.2 7.4 6.1 2.6 Type of Electric Air-Conditioning Used Central

  11. Alternative Fuels Data Center: Biodiesel Equipment Options

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Equipment Options to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Equipment Options on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Equipment Options on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Equipment Options on Google Bookmark Alternative Fuels Data Center: Biodiesel Equipment Options on Delicious Rank Alternative Fuels Data Center: Biodiesel Equipment Options on Digg Find More places to share Alternative Fuels Data Center: Biodiesel

  12. Processing and Manufacturing Equipment | Open Energy Information

    Open Energy Info (EERE)

    Processing and Manufacturing Equipment Jump to: navigation, search TODO: Add description List of Processing and Manufacturing Equipment Incentives Retrieved from "http:...

  13. Materials Selection Considerations for Thermal Process Equipment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Materials Selection Considerations for Thermal Process Equipment: A BestPractices Process Heating Technical Brief Materials Selection Considerations for Thermal Process Equipment: ...

  14. Cruising Equipment Company CECO | Open Energy Information

    Open Energy Info (EERE)

    Equipment Company (CECO) Place: Seattle, Washington Zip: 98107 Product: Maker of pollution control equipment - bought by Xantrex in 2000. Coordinates: 47.60356,...

  15. CVD Equipment Corp | Open Energy Information

    Open Energy Info (EERE)

    Place: Ronkonkoma, New York Zip: 11779 Sector: Solar Product: New York-based maker of chemical vapour deposition process equipment. This equipment is used in the manufacture of...

  16. Advanced Battery Manufacturing Facilities and Equipment Program...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Advanced Battery Manufacturing Facilities and Equipment Program Advanced Battery Manufacturing Facilities and Equipment Program Fact Sheet: Grid-Scale ...

  17. Advanced Battery Manufacturing Facilities and Equipment Program...

    Broader source: Energy.gov (indexed) [DOE]

    and Equipment Program Advanced Battery Manufacturing Facilities and Equipment Program AVTA: 2010 Honda Civic HEV with Experimental Ultra Lead Acid Battery Testing Results

  18. DMSE Equipment Scheduling | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduling Equipment ownercustodian reserves the right to override the schedule for maintenance andor other justified reasons. Abuse of the scheduling system or equipment may...

  19. Laboratory Equipment Donation Program - Guidelines/FAQ

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    eligible to participate in the Laboratory Equipment Donation Program (LEDP) program. ... physically attached to an energy-related laboratory equipment system); General supplies. ...

  20. Laboratory Equipment Donation Program - About Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About LEDP The Laboratory Equipment Donation Program (LEDP), formerly the Energy-Related Laboratory Equipment (ERLE) Grant Program, was established by the United States Department ...

  1. Laboratory Equipment Donation Program - Home Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy (DOE), in accordance with its responsibility to encourage research and development in the energy area, awards grants of used energy-related laboratory equipment. equipment

  2. Laboratory Equipment Donation Program - LEDP Widget

    Office of Scientific and Technical Information (OSTI)

    LEDP Widget You can access key features of the Laboratory Equipment Donation Program (LEDP) website by downloading the LEDP widget. Use the widget to search, view the equipment ...

  3. Personal Computing Equipment | Open Energy Information

    Open Energy Info (EERE)

    Computing Equipment Jump to: navigation, search TODO: Add description List of Personal Computing Equipment Incentives Retrieved from "http:en.openei.orgwindex.php?titlePersona...

  4. China Shandong Penglai Electric Power Equipment Manufacturing...

    Open Energy Info (EERE)

    Penglai Electric Power Equipment Manufacturing Jump to: navigation, search Name: China Shandong Penglai Electric Power Equipment Manufacturing Place: Penglai, Shandong Province,...

  5. Moncada Solar Equipment | Open Energy Information

    Open Energy Info (EERE)

    search Name: Moncada Solar Equipment Place: Italy Product: Developer and manufacturer of thin-film modules. References: Moncada Solar Equipment1 This article is a stub. You can...

  6. Trends in powder processing equipment

    SciTech Connect (OSTI)

    Sheppard, L.M.

    1993-05-01

    Spray drying is the most widely used process for producing particles. It is used in industries other than ceramics including food, chemicals, and pharmaceutical. The process involves the atomization of a liquid feed stock into a spray of droplets and contacting the droplets with hot air in a drying chamber. The sprays are produced by either rotary or nozzle atomizers. Evaporation of moisture from the droplets and formation of dry particles proceed under controlled temperature and airflow conditions. Powder is then discharged continuously from the drying chamber. Spray drying equipment is being improved to handle an ever-increasing number of applications. Several developments in particle-size reduction equipment are also described.

  7. Strategy Guideline. HVAC Equipment Sizing

    SciTech Connect (OSTI)

    Burdick, Arlan

    2012-02-01

    This guide describes the equipment selection of a split system air conditioner and furnace for an example house in Chicago, IL as well as a heat pump system for an example house in Orlando, FL. The required heating and cooling load information for the two example houses was developed in the Department of Energy Building America Strategy Guideline: Accurate Heating and Cooling Load Calculations.

  8. Energy-related laboratory equipment (ERLE) guidelines

    SciTech Connect (OSTI)

    Not Available

    1995-01-01

    This document describes the Used Energy-Related Laboratory Equipment grants, and eligibility and procedures for participation. The document contains tables identifying typical equipment that may be requested, where to review ERLE equipment lists, and where to mail applications, a description of the eligible equipment grants access data system, and a copy of the ERLE grant application and instructions for its completion and submission.

  9. Specialty Vehicles and Material Handling Equipment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Industrial Power Efficient Simple Clean Today Industrial Power Efficient Simple Clean Today Specialty Vehicles and Material Handling Equipment Specialty Vehicles and Material Handling Equipment Specialty Vehicles and Material Handling Equipment Specialty Vehicles and Material Handling Equipment Matching Federal Government Energy Needs with Energy Efficient F Matching Federal Government Energy Needs with Energy Efficient F Matching Federal Government Energy Needs with Energy Efficient F Matching

  10. Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a residence in the City, State jurisdiction. This permit addresses one of the following situations: Only an additional branch circuit would be added at the residence A hard-wired charging station would be installed at the residence. The attached requirements for wiring the charging station are taken directly out of the 2011 edition of the National Electrical Code (NEC) NFPA

  11. Negative hydrogen ion beam extraction from an AC heated cathode driven Bernas-type ion source

    SciTech Connect (OSTI)

    Okano, Y.; Miyamoto, N.; Kasuya, T.; Wada, M.

    2015-04-08

    A plasma grid structure was installed to a Bernas-type ion source used for ion implantation equipment. A negative hydrogen (H{sup −}) ion beam was extracted by an AC driven ion source by adjusting the bias to the plasma grid. The extracted electron current was reduced by positively biasing the plasma grid, while an optimum plasma grid bias voltage for negative ion beam extraction was found to be positive 3 V with respect to the arc chamber. Source operations with AC cathode heating show extraction characteristics almost identical to that with DC cathode heating, except a minute increase in H{sup −} current at higher frequency of cathode heating current.

  12. SAS Output

    U.S. Energy Information Administration (EIA) Indexed Site

    28.00 2.00 2.00 23.00 89.00 Fire 1.00 -- 1.00 1.00 3.00 -- -- 50.00 56.00 Vandalism, Terrorism, or Malicious Acts -- -- -- -- 7.00 -- -- -- 7.00 Failed AC Substation Equipment...

  13. Transportation Equipment (2010 MECS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transportation Equipment (2010 MECS) Transportation Equipment (2010 MECS) Manufacturing Energy and Carbon Footprint for Transportation Equipment Sector (NAICS 336) Energy use data source: 2010 EIA MECS (with adjustments) Footprint Last Revised: February 2014 View footprints for other sectors here. Manufacturing Energy and Carbon Footprint Transportation Equipment (125.57 KB) More Documents & Publications MECS 2006 - Transportation Equipment Cement (2010 MECS) Glass and Glass Products (2010

  14. Equipment Listing | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Equipment Listing Crystal Preparation and Characterization Resistance Heated Bridgman Crystal Growth Systems Back-Reflection Laue X-ray System Electro-Discharge Machining High and Low speed Diamond Saws Arc Zone Melting Crystal Growth System Lapping Fixtures for Precise Orientation of Crystals (0.1°) Physical Properties Measurement Facilities - Hardness Testing Vickers and Rockwell Hardness Testing Brinell Hardness Instrument Wilson Tukon Micro Hardness Tester Forming and Characterization

  15. Strategy Guideline: HVAC Equipment Sizing

    SciTech Connect (OSTI)

    Burdick, A.

    2012-02-01

    The heating, ventilation, and air conditioning (HVAC) system is arguably the most complex system installed in a house and is a substantial component of the total house energy use. A right-sized HVAC system will provide the desired occupant comfort and will run efficiently. This Strategy Guideline discusses the information needed to initially select the equipment for a properly designed HVAC system. Right-sizing of an HVAC system involves the selection of equipment and the design of the air distribution system to meet the accurate predicted heating and cooling loads of the house. Right-sizing the HVAC system begins with an accurate understanding of the heating and cooling loads on a space; however, a full HVAC design involves more than just the load estimate calculation - the load calculation is the first step of the iterative HVAC design procedure. This guide describes the equipment selection of a split system air conditioner and furnace for an example house in Chicago, IL as well as a heat pump system for an example house in Orlando, Florida. The required heating and cooling load information for the two example houses was developed in the Department of Energy Building America Strategy Guideline: Accurate Heating and Cooling Load Calculations.

  16. Toward more testable security equipment

    SciTech Connect (OSTI)

    Spencer, D.D.; Murray, D.W. )

    1991-01-01

    An important functional aspect of most security related equipment is the need for periodic performance testing. Sensors, entry-control devices, and other such security equipment usually have some sort or reliability or testing requirements. Unfortunately, testing requirements are seldom considered during equipment design, and testing becomes a prohibitively expensive or inconvenient afterthought. In this paper work at Sandia National Laboratories to address this concern is presented, focusing on metal detectors as a test case. Field testing of metal detectors is usually done by passing a test object through the opening to see whether an alarm is generated or not. Such alarm/no-alarm data are poor for making reliability estimates, and thus, a large quantity of such data is required to make good reliability statements. The detector itself uses much better internal information. Experiments tapping into some of this internal data will be discussed, and conclusions will be drawn about the possibility of redesign of metal detectors for enhanced testability. Such conclusions have implications for other types of security-related devices, as well.

  17. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  18. Allianz Climate Solutions ACS GmbH | Open Energy Information

    Open Energy Info (EERE)

    Allianz Climate Solutions ACS GmbH Jump to: navigation, search Name: Allianz Climate Solutions (ACS) GmbH Place: Munich, Germany Zip: 80802 Product: Munich-based subsidiary of...

  19. Fire suppression and detection equipment

    SciTech Connect (OSTI)

    E.E. Bates

    2006-01-15

    Inspection and testing guidelines go beyond the 'Code of Federal Regulation'. Title 30 of the US Code of Federal Regulations (30 CFR) contains requirements and references to national standards for inspection, testing and maintenance of fire suppression and detection equipment for mine operators. However, federal requirements have not kept pace with national standards and best practices. The article lists National Fire Protection (NFPA) standards that are referenced by the US Mine Safety and Health Administration (MSHA) in 30 CFR. It then discusses other NFPA Standards excluded from 30 CFR and explains the NFPA standard development process. 2 refs., 3 tabs., 5 photos.

  20. Bulk Hauling Equipment for CHG

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BULK HAULING EQUIPMENT FOR CHG Don Baldwin Director of Product Development - Hexagon Lincoln HEXAGON LINCOLN TITAN(tm) Module System Compressed Hydrogen Gas * Capacity 250 bar - 616 kg 350 bar - 809 kg 540 bar - 1155 kg * Gross Vehicle Weight (with prime mover) 250 bar - 28 450 kg 350 bar - 30 820 kg 540 bar - 39 440 kg * Purchase Cost 250 bar - $510,000 350 bar - $633,750 540 bar - $1,100,000 Compressed Natural Gas * Capacity (250 bar at 15 C) - 7412 kg * GVW (With prime mover) - 35 250 kg *

  1. HAND TRUCK FOR HANDLING EQUIPMENT

    DOE Patents [OSTI]

    King, D.W.

    1959-02-24

    A truck is described for the handling of large and relatively heavy pieces of equipment and particularly for the handling of ion source units for use in calutrons. The truck includes a chassis and a frame pivoted to the chassis so as to be operable to swing in the manner of a boom. The frame has spaced members so arranged that the device to be handled can be suspended between or passed between these spaced members and also rotated with respect to the frame when the device is secured to the spaced members.

  2. Best Management Practice #11: Commercial Kitchen Equipment

    Broader source: Energy.gov [DOE]

    Commercial kitchen equipment can be a significant water use in the non-residential sector. Water efficiency for commercial kitchen equipment is especially important because high-volume applications...

  3. BCM 1 Equipment Inventory | Sample Preparation Laboratories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Equipment Inventory Biology Chemistry & Material Science Laboratory 1 Title Equipment Type Description Corning 430 pH Meter pH Meter The Corning 430 pH meter is designed to ...

  4. BCM 2 Equipment Inventory | Sample Preparation Laboratories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Equipment Inventory Biology Chemistry & Material Science Laboratory 2 Title Equipment Type Description Accumet Basic AB15 pH meter pH Meter pH meters with combination AgAgCl ...

  5. Laboratory Equipment Donation Program - Application Process

    Office of Scientific and Technical Information (OSTI)

    Equipment listings on the LEDP web site are obtained from the U.S. General Services Administration (GSA) Energy Asset Disposal System (EADS). Once equipment is listed, EADS allows ...

  6. Attendees: John Cymbalsky, Equipment and Appliance Standards...

    Broader source: Energy.gov (indexed) [DOE]

    ... The two stages are necessary because the first stage converts AC current to a DC current while also ensuring that the input power quality of the LED Driver satisfied strict power ...

  7. AUDIT REPORT Followup on Western Area Power Administration's...

    Broader source: Energy.gov (indexed) [DOE]

    ... controls over issuing keys to access critical substation gates and control buildings. ... matters. 3 destroying equipment in substation yards and control buildings could cause ...

  8. Microsoft Word - SWPAGenReqsInterconnFinal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... for specific requirements regarding substation, metering, relaying, communications and ... all equipment located in a Southwestern substation; however, in the event the requesting ...

  9. Microsoft PowerPoint - Schatz Materials Research in T&D [Read...

    Energy Savers [EERE]

    ...visualization not included, but have their own materials wish lists Substation Transformers Other Substation Equipment 5 Transmission Infrastructure 6 Transmission System ...

  10. Microsoft Word - DOE-ID-INL-15-013 (1).docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (TRA)-774 Substation Equipment Upgrades SECTION B. Project Description: Electricity for heat at the Advanced Test Reactor (ATR) heaters is fed from the substation yard TRA-774 ...

  11. Entergy Services, Inc. Smart Grid Project | Open Energy Information

    Open Energy Info (EERE)

    tools.3 Equipment 41 Phasor Measurement Units across 21 Substations 21 Substation Computers Targeted Benefits AngleFrequency Monitoring Post-Mortem Analysis Voltage Stability...

  12. Appliance and Equipment Standards Program Logic Model

    Broader source: Energy.gov (indexed) [DOE]

    standards, resulting in energy savings in the buildings sector The Appliance & Equipment ... incentives, Legislation Regulation Objectives Activities ...

  13. Laboratory Equipment Donation Program - About Us

    Office of Scientific and Technical Information (OSTI)

    About LEDP The Laboratory Equipment Donation Program (LEDP), formerly the Energy-Related Laboratory Equipment (ERLE) Grant Program, was established by the United States Department of Energy (DOE) to grant surplus and available used energy-related laboratory equipment to universities and colleges in the United States for use in energy oriented educational programs. This grant program is sponsored by the Office of Workforce Development for Teachers and Scientists (WDTS). The listing of equipment

  14. Liquid-Liquid Extraction Equipment

    SciTech Connect (OSTI)

    Jack D. Law; Terry A. Todd

    2008-12-01

    Solvent extraction processing has demonstrated the ability to achieve high decontamination factors for uranium and plutonium while operating at high throughputs. Historical application of solvent extraction contacting equipment implies that for the HA cycle (primary separation of uranium and plutonium from fission products) the equipment of choice is pulse columns. This is likely due to relatively short residence times (as compared to mixer-settlers) and the ability of the columns to tolerate solids in the feed. Savannah River successfully operated the F-Canyon with centrifugal contactors in the HA cycle (which have shorter residence times than columns). All three contactors have been successfully deployed in uranium and plutonium purification cycles. Over the past 20 years, there has been significant development of centrifugal contactor designs and they have become very common for research and development applications. New reprocessing plants are being planned in Russia and China and the United States has done preliminary design studies on future reprocessing plants. The choice of contactors for all of these facilities is yet to be determined.

  15. Carbon Absorber Retrofit Equipment (CARE)

    SciTech Connect (OSTI)

    Klein, Eric

    2015-12-23

    During Project DE-FE0007528, CARE (Carbon Absorber Retrofit Equipment), Neumann Systems Group (NSG) designed, installed and tested a 0.5MW NeuStream® carbon dioxide (CO2) capture system using the patented NeuStream® absorber equipment and concentrated (6 molal) piperazine (PZ) as the solvent at Colorado Springs Utilities’ (CSU’s) Martin Drake pulverized coal (PC) power plant. The 36 month project included design, build and test phases. The 0.5MW NeuStream® CO2 capture system was successfully tested on flue gas from both coal and natural gas combustion sources and was shown to meet project objectives. Ninety percent CO2 removal was achieved with greater than 95% CO2product purity. The absorbers tested support a 90% reduction in absorber volume compared to packed towers and with an absorber parasitic power of less than 1% when configured for operation with a 550MW coal plant. The preliminary techno-economic analysis (TEA) performed by the Energy and Environmental Research Center (EERC) predicted an over-the-fence cost of $25.73/tonne of CO2 captured from a sub-critical PC plant.

  16. Novel Energy Conversion Equipment for Low Temperatures Geothermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Conversion Equipment for Low Temperatures Geothermal Resources Novel Energy Conversion Equipment for Low Temperatures Geothermal Resources Novel Energy Conversion Equipment ...

  17. Category:Smart Grid Projects - Equipment Manufacturing | Open...

    Open Energy Info (EERE)

    Smart Grid Projects - Equipment Manufacturing Jump to: navigation, search Smart Grid Projects - Equipment Manufacturing category. Pages in category "Smart Grid Projects - Equipment...

  18. Early Markets: Fuel Cells for Material Handling Equipment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Material Handling Equipment Early Markets: Fuel Cells for Material Handling Equipment This fact sheet describes the use of hydrogen fuel cells to power material handling equipment ...

  19. Better metallurgy for process equipment

    SciTech Connect (OSTI)

    Rayner, R.E.

    1994-01-01

    Metallurgy choices have expanded significantly for process equipment and pumps used for handling difficult corrosive fluids. If they have been specifying the austenitic AISI types 316, 316L, 317, 317L or the newer first generation alloy 329 in their pumps, there is a strong message in recent literature. Based on tests and experience there are better, often less costly alternatives. In the case of CD[sub 4]MCu, N08020 and 904L, there are lower-cost material alternatives for many applications. For SA S31254 and SA N08367, there are some less aggressive can be substituted. These alternatives are the new second generation duplex steels. The lower cost of the duplex alloys is a result of the reduced nickel content, which is about half that of the standard austenitics. Also, their carbon content is low; the same as 316L and 317L for most alloys, including S31803. The second generation duplex alloys offer significant value improvement in a vast majority of applications over the common austenitics and ferritics. Further, their improved resistance to corrosion and improved physical properties relative to the expensive. and in many cases proprietary, highly corrosion-resistant, super-ferritics and super-austenitics, means that they can and should be considered as an alternative for applications where those materials are now overqualified. Strength, toughness and wide corrosion resistance are all-important properties and considerations for process pump materials. Combine these with competitive cost and there is an opportunity that must be investigated.

  20. Commercial Refrigeration Equipment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commercial Refrigeration Equipment Commercial Refrigeration Equipment The Department of Energy (DOE) develops standardized data templates for reporting the results of tests conducted in accordance with current DOE test procedures. Templates may be used by third-party laboratories under contract with DOE that conduct testing in support of ENERGY STAR® verification, DOE rulemakings, and enforcement of the federal energy conservation standards. Commercial Refrigeration Equipment -- v2.0 (87.25 KB)

  1. Decontamination and Decommisioning Equipment Tracking System

    Energy Science and Technology Software Center (OSTI)

    1994-08-26

    DDETS is Relational Data Base Management System (RDBMS) which incorporates 1-D (code 39) and 2-D (PDF417) bar codes into its equipment tracking capabilities. DDETS is compatible with the Reportable Excess Automated Property System (REAPS), and has add, edit, delete and query capabilities for tracking equipment being decontaminated and decommissioned. In addition, bar code technology is utilized in the inventory tracking and shipping of equipment.

  2. Equipment-Resources-PHaSe-EFRC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Equipment Equipment photo Last update 30 April 2015. People wishing to use equipment listed below must first receive training and permission from the Facility Director, or present instrument contact person, who can provide basic training and information from an experienced user. Training and access must be arranged in advance of first use. Reservation of usage time for a number of instruments requires you to set up an account on the Facilities Online Manager (FOM) service! Connect to the

  3. Laboratory Equipment & Supplies | Sample Preparation Laboratories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Equipment & Supplies John Bargar, SSRL Scientist Equipment is available to serve disciplines from biology to material science. All laboratories contain the following standard laboratory equipment: pH meters with standard buffers, analytical balances, microcentrifuges, vortex mixers, ultrasonic cleaning baths, magnetic stirrers, hot plates, and glassware. Most laboratories offer ice machines and cold rooms. Specialty storage areas for samples include a -80 freezer, argon and nitrogen glove

  4. Large-Scale Liquid Hydrogen Handling Equipment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8, 2007 Jerry Gillette Large-Scale Liquid Hydrogen Handling Equipment Hydrogen Delivery Analysis Meeting Argonne National Laboratory Some Delivery Pathways Will Necessitate the Use of Large- Scale Liquid Hydrogen Handling Equipment „ Potential Scenarios include: - Production plant shutdowns - Summer-peak storage „ Equipment Needs include: - Storage tanks - Liquid Pumps - Vaporizers - Ancillaries 2 1 Concern is that Scaling up from Small Units Could Significantly Underestimate Costs of Larger

  5. Experimental Equipment | Stanford Synchrotron Radiation Lightsource

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Equipment SSRL plans the distribution of its limited equipment on the basis of the information supplied on the Beam Time Request Form and the User Support Requirements Form. Please make sure to state all of your needs. Standard X-Ray Station Equipment Standard equipment to be found on an x-ray station includes: (1 ea.) Small and large ionization chambers (1) Exit slits (1) X-Y sample positioner (3) Keithly 427 current-to-voltage amplifier TEK 2215 60 MHZ 2 channel scope Voltage-to-frequency

  6. Heavy Mobile Equipment Mechanic (One Mechanic Shop)

    Broader source: Energy.gov [DOE]

    Join the Bonneville Power Administration (BPA) for a challenging and rewarding career, while working, living, and playing in the Pacific Northwest. The Heavy Mobile Equipment Mechanic (One Mechanic...

  7. Advanced Battery Manufacturing Facilities and Equipment Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    D.C. PDF icon esarravt002flicker2010p.pdf More Documents & Publications Advanced Battery Manufacturing Facilities and Equipment Program Advanced Battery Manufacturing...

  8. CRAD, Nuclear Facility Construction - Mechanical Equipment -...

    Broader source: Energy.gov (indexed) [DOE]

    Nuclear Facility Construction - Mechanical Equipment Installation, (HSS CRAD 45-53, Rev. 0) This Criteria Review and Approach Document (HSS CRAD 45-53) establishes review criteria...

  9. Equipment Certification Requirements | Open Energy Information

    Open Energy Info (EERE)

    Fuel Cells Geothermal Electric Hydroelectric energy Hydroelectric (Small) Natural Gas Nuclear Solar Photovoltaics Tidal Energy Wave Energy Wind energy Yes Madison - Equipment...

  10. Heavy Mobile Equipment Mechanic (1 Mechanic Shop)

    Broader source: Energy.gov [DOE]

    A successful candidate will perform preventative, predictive, and corrective maintenance on Bonneville Power Administration (BPA's) light and heavy mobile equipment in maintenance and filed...

  11. Commercial and Industrial Kitchen Equipment Rebate Program

    Broader source: Energy.gov [DOE]

    NOTE: All equipment must be installed on or after January 1, 2015 through December 31, 2015. The documentation must be received no later than March 31, 2016. 

  12. PPP Equipment Corporation | Open Energy Information

    Open Energy Info (EERE)

    PPP Equipment Corporation Sector: Solar Product: PPP-E designs, produces and markets Chemical Vapor Deposition (CVD) reactors and converter systems producing high-purity...

  13. Agricultural Lighting and Equipment Rebate Program

    Broader source: Energy.gov [DOE]

    In Vermont, agricultural operations are eligible for prescriptive and customized incentives for equipment proven to help make farms more efficient. Prescriptive rebates are available for lighting...

  14. Process Equipment Cost Estimation, Final Report

    SciTech Connect (OSTI)

    H.P. Loh; Jennifer Lyons; Charles W. White, III

    2002-01-01

    This report presents generic cost curves for several equipment types generated using ICARUS Process Evaluator. The curves give Purchased Equipment Cost as a function of a capacity variable. This work was performed to assist NETL engineers and scientists in performing rapid, order of magnitude level cost estimates or as an aid in evaluating the reasonableness of cost estimates submitted with proposed systems studies or proposals for new processes. The specific equipment types contained in this report were selected to represent a relatively comprehensive set of conventional chemical process equipment types.

  15. Equips Nucleares SA | Open Energy Information

    Open Energy Info (EERE)

    SA Place: Madrid, Spain Zip: 28006 Sector: Services Product: ENSA is a Spanish nuclear components and nuclear services supply company. References: Equips Nucleares, SA1...

  16. Smart Buildings Equipment Initiative | Department of Energy

    Energy Savers [EERE]

    ...equipment; and 3) developing and (selectively) executing test procedures that can be used to evaluate the "demand response compliant" statusmaturity of various technologies. ...

  17. Laboratory Equipment Donation Program - Contact Us

    Office of Scientific and Technical Information (OSTI)

    Contact Us If you have a question about the Laboratory Equipment Donation Program (LEDP), we recommend you check frequently asked questions. If your question still has not been ...

  18. Semiconductor Equipment and Materials International SEMI | Open...

    Open Energy Info (EERE)

    search Name: Semiconductor Equipment and Materials International (SEMI) Place: San Jose, California Zip: 95134 2127 Product: Global trade association, publisher and conference...

  19. Stangl Semiconductor Equipment AG | Open Energy Information

    Open Energy Info (EERE)

    German manufacturer of wet chemistry systems for processing silicon and thin-film solar cells. References: Stangl Semiconductor Equipment AG1 This article is a stub. You...

  20. China Power Equipment Inc | Open Energy Information

    Open Energy Info (EERE)

    Inc Jump to: navigation, search Name: China Power Equipment Inc Place: Xian, China Zip: 70075 Product: China-based manufacturer of energy saving transformers and transformer cores....

  1. Enforcement Policy Statement: Commercial HVAC Equipment Issued...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Liquid desiccant system, desiccant wheels. Indoor or Outdoor Fan Motor with Variable Frequency Drive (VFD). A device connected electrically between the equipment's power supply ...

  2. Non-vanishing ponderomotive AC electrophoretic effect for particle trapping

    SciTech Connect (OSTI)

    Guan, Weihau; Park, Jae Hyun nmn; Krstic, Predrag S; Reed, Mark A

    2011-01-01

    We present here a study on overlooked aspects of alternating current (AC) electrokinetics AC electrophoretic (ACEP) phenomena. The dynamics of a particle with both polarizability and net charges in a non-uniform AC electric trapping field is investigated. It is found that either electrophoretic (EP) or dielectrophoretic (DEP) effects can dominate the trapping dynamics, depending on experimental conditions. A dimensionless parameter gamma is developed to predict the relative strength of EP and DEP effects in a quadrupole AC field. An ACEP trap is feasible for charged particles in salt-free or low salt concentration solutions. In contrast to DEP traps, an ACEP trap favors the downscaling of the particle size.

  3. Light Absorption of Primary Organic Aerosol Paper Named ACS Editors...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Absorption of Primary Organic Aerosol Paper Named ACS Editors' Choice For original submission and image(s), see ARM Research Highlights http:www.arm.govsciencehighlights...

  4. Appliance/Equipment Efficiency Standards | Open Energy Information

    Open Energy Info (EERE)

    ApplianceEquipment Efficiency Standards Massachusetts Boilers Furnaces No Appliance Energy Efficiency Standards (Maryland) ApplianceEquipment Efficiency Standards Maryland...

  5. General Restaurant Equipment: Order (2013-CE-5344)

    Broader source: Energy.gov [DOE]

    DOE ordered General Restaurant Equipment Co. to pay a $8,000 civil penalty after finding General Restaurant Equipment had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  6. Laboratory Equipment Donation Program - Home Page

    Office of Scientific and Technical Information (OSTI)

    Get the tools you need to inspire innovation and creativity The United States Department of Energy (DOE), in accordance with its responsibility to encourage research and development in the energy area, awards grants of used energy-related laboratory equipment. equipment

  7. Universal null DTE (data terminal equipment)

    DOE Patents [OSTI]

    George, M.; Pierson, L.G.; Wilkins, M.E.

    1987-11-09

    A communication device in the form of data terminal equipment permits two data communication equipments, each having its own master clock and operating at substantially the same nominal clock rate, to communicate with each other in a multi-segment circuit configuration of a general communication network even when phase or frequency errors exist between the two clocks. Data transmitted between communication equipments of two segments of the communication network is buffered. A variable buffer fill circuit is provided to fill the buffer to a selectable extent prior to initiation of data output clocking. Selection switches are provided to select the degree of buffer preload. A dynamic buffer fill circuit may be incorporated for automatically selecting the buffer fill level as a function of the difference in clock frequencies of the two equipments. Controllable alarm circuitry is provided for selectively generating an underflow or an overflow alarm to one or both of the communicating equipments. 5 figs.

  8. Automatic monitoring of vibration welding equipment

    DOE Patents [OSTI]

    Spicer, John Patrick; Chakraborty, Debejyo; Wincek, Michael Anthony; Wang, Hui; Abell, Jeffrey A; Bracey, Jennifer; Cai, Wayne W

    2014-10-14

    A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host device, a check station, and a robot. The robot moves the horn and anvil via an arm to the check station. Sensors, e.g., temperature sensors, are positioned with respect to the welding equipment. Additional sensors are positioned with respect to the check station, including a pressure-sensitive array. The host device, which monitors a condition of the welding equipment, measures signals via the sensors positioned with respect to the welding equipment when the horn is actively forming a weld. The robot moves the horn and anvil to the check station, activates the check station sensors at the check station, and determines a condition of the welding equipment by processing the received signals. Acoustic, force, temperature, displacement, amplitude, and/or attitude/gyroscopic sensors may be used.

  9. Electrostatic coalescence system with independent AC and DC hydrophilic electrodes

    DOE Patents [OSTI]

    Hovarongkura, A. David; Henry, Jr., Joseph D.

    1981-01-01

    An improved electrostatic coalescence system is provided in which independent AC and DC hydrophilic electrodes are employed to provide more complete dehydration of an oil emulsion. The AC field is produced between an AC electrode array and the water-oil interface wherein the AC electrode array is positioned parallel to the interface which acts as a grounded electrode. The emulsion is introduced into the AC field in an evenly distributed manner at the interface. The AC field promotes drop-drop and drop-interface coalescence of the water phase in the entering emulsion. The continuous oil phase passes upward through the perforated AC electrode array and enters a strong DC field produced between closely spaced DC electrodes in which small dispersed droplets of water entrained in the continuous phase are removed primarily by collection at hydrophilic DC electrodes. Large droplets of water collected by the electrodes migrate downward through the AC electrode array to the interface. All phase separation mechanisms are utilized to accomplish more complete phase separation.

  10. HVDC-AC system interaction from AC harmonics. Volume 1. Harmonic impedance calculations. Final report

    SciTech Connect (OSTI)

    Breuer, G D; Chow, J H; Lindh, C B; Miller, N W; Numrich, F H; Price, W W; Turner, A E; Whitney, R R

    1982-09-01

    Improved methods are needed to characterize ac system harmonic behavior for ac filter design for HVDC systems. The purpose of this General Electric Company RP1138 research is to evaluate the present filter design practice and to investigate methods for calculating system harmonic impedances. An overview of ac filter design for HVDC systems and a survey of literature related to filter design have been performed. Two methods for calculating system harmonic impedances have been investigated. In the measurement method, an instrumentation system for measuring system voltage and current has been assembled. Different schemes of using the measurements to calculate system harmonic impedances have been studied. In the analytical method, a procedure to include various operating conditions has been proposed. Computer programs for both methods have been prepared, and the results of the measurement and analytical methods analyzed. A conclusion of the project is that the measurement and analytical methods both provided reasonable results. There are correlations between the measured and analytical results for most harmonics, although there are discrepancies between the assumptions used in the two methods. A sensitivity approach has been proposed to further correlate the results. From the results of the analysis, it is recommended that both methods should be tested further. For the measurement method, more testing should be done to cover different system operating conditions. In the analytical method, more detailed models for representing system components should be studied. In addition, alternative statistical and sensitivity approaches should be attempted.

  11. NAFTA opportunities: Electrical equipment and power generation

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    The North American Free Trade Agreement (NAFTA) provides significant commercial opportunities in Mexico and Canada for the United States electric equipment and power generation industries, through increased goods and services exports to the Federal Electricity Commission (CFE) and through new U.S. investment in electricity generation facilities in Mexico. Canada and Mexico are the United States' two largest export markets for electrical equipment with exports of $1.53 billion and $1.51 billion, respectively, in 1992. Canadian and Mexican markets represent approximately 47 percent of total U.S. exports of electric equipment. The report presents an economic analysis of the section.

  12. Subsea equipment marriage is top ROV priority

    SciTech Connect (OSTI)

    Redden, J.

    1985-04-01

    Interfacing subsea equipment with remotely operated vehicles (ROV's) and the further development of arctic-class units are the primary challenges facing manufacturers. Worldwide use of the ROV for drilling support has exploded during this decade as oil companies continue their search in deeper waters. If the unmanned vehicles are to become an even more integral tool of the oilman, experts say they must be able to perform more complex tasks. The evolution of more multi-purpose ROVs, however, hinges on the redesigning of subsea equipment. The severe limitations on subsea support (by ROVs) is the obsolete design associated with the subsea equipment itself. These limitations are discussed.

  13. Incidents of chemical reactions in cell equipment

    SciTech Connect (OSTI)

    Baldwin, N.M.; Barlow, C.R.

    1991-12-31

    Strongly exothermic reactions can occur between equipment structural components and process gases under certain accident conditions in the diffusion enrichment cascades. This paper describes the conditions required for initiation of these reactions, and describes the range of such reactions experienced over nearly 50 years of equipment operation in the US uranium enrichment program. Factors are cited which can promote or limit the destructive extent of these reactions, and process operations are described which are designed to control the reactions to minimize equipment damage, downtime, and the possibility of material releases.

  14. Water-Using Equipment: Commercial and Industrial

    SciTech Connect (OSTI)

    Solana, Amy E.; Mcmordie, Katherine

    2006-01-24

    Water is an important aspect of many facets in energy engineering. While the previous article detailed domestic related water-using equipment such as toilets and showerheads, this article focuses on various types of water-using equipment in commercial and industrial facilities, including commercial dishwashers and laundry, single-pass cooling equipment, boilers and steam generators, cooling towers, and landscape irrigation. Opportunities for water and energy conservation are explained, including both technology retrofits and operation and maintenance changes. Water management planning and leak detection are also included as they are essential to a successful water management program.

  15. Automatic monitoring of vibration welding equipment (Patent)...

    Office of Scientific and Technical Information (OSTI)

    A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host device, a check station, and a robot. The robot moves the horn and anvil via ...

  16. Property Tax Assessment for Renewable Energy Equipment

    Broader source: Energy.gov [DOE]

    H.B. 2403 of 2014 clarified that depreciation should be determined using straight-line depreciation over the useful life of the equipment. The taxable original cost equals the original cost of th...

  17. Renewable Energy Equipment Exemption | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    100% of sales tax Summary Iowa allow a sales tax exemption for solar, wind, and hydroelectricity equipment. As of August 2014, the Iowa sales tax rate is 6%. Wind For wind energy...

  18. Biomass Equipment & Materials Compensating Tax Deduction

    Broader source: Energy.gov [DOE]

    In 2005, New Mexico adopted a policy to allow businesses to deduct the value of biomass equipment and biomass materials used for the processing of biopower, biofuels, or biobased products in...

  19. Field surveys of office equipment operating patterns

    SciTech Connect (OSTI)

    Webber, Carrie A.; Roberson, Judy A.; Brown, Richard E.; Payne, Christopher T.; Nordman, Bruce; Koomey, Jonathan G.

    2001-09-05

    This paper presents the results of 11 after-hours walk-throughs of offices in the San Francisco CA and Washington D.C. areas. The primary purpose of these walk-throughs was to collect data on turn-off rates for various types of office equipment (computers, monitors, printers, fax machines, copiers, and multifunction products). Each piece of equipment observed was recorded and its power status noted (e.g. on, off, low power). Whenever possible, we also recorded whether power management was enabled on the equipment. The floor area audited was recorded as well, which allowed us to calculate equipment densities. We found that only 44 percent of computers, 32 percent of monitors, and 25 percent of printers were turned off at night. Based on our observations we estimate success rates of 56 percent for monitor power management and 96 percent for enabling of power management on printers.

  20. Consider Steam Turbine Drives for Rotating Equipment

    SciTech Connect (OSTI)

    Not Available

    2006-01-01

    This revised ITP tip sheet on steam turbine drives for rotating equipment provides how-to advice for improving the system using low-cost, proven practices and technologies.

  1. Capital Equipment Validation Form | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Capital Equipment Validation Form Version Number: 2.0 Document Number: Form 48100.001 Effective Date: 02/2015 File (public): Office spreadsheet icon form_48100.001_rev2.xls

  2. Liberty Utilities Iowa High Efficiency Equipment Rebate

    Broader source: Energy.gov [DOE]

    Liberty Utilities offers a rebate to its Iowa residential and small business customers for the purchase of high efficiency ENERGY STAR natural gas home heating and water heating equipment....

  3. Hot conditioning equipment conceptual design report

    SciTech Connect (OSTI)

    Bradshaw, F.W., Westinghouse Hanford

    1996-08-06

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage.

  4. Workplace Charging Equipment and Installation Costs | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Charging equipment costs depend on the type of charging station you decide to install in your workplace. Level 1 (300-1,500) and Level 2 (400-6,500) charging stations are ...

  5. Geoscience Equipment Inventory | Sample Preparation Laboratories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Geoscience Equipment Inventory « Geoscience Laboratory Title Equipment Type Description Coy Anaerobic Chamber Inert Atmosphere Chamber Coy anaerobic chamber (Type C, model 7100-000) with auto airlock for wet and dry sample preparations, 5% H2/95% N2 mix atmosphere, and auto injection system. Fisher Scientific General Purpose Refrigerator Temperature Control Fisher Scientific General Purpose refrigerator. Fisher Scientific Isotemp Freezer Temperature Control Fisher Scientific Isotemp Freezer.

  6. Available for Checkout Equipment Inventory | Sample Preparation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratories Available for Checkout Equipment Inventory « Equipment Resources Title Description Agate Mortar & Pestle Sets Agate mortar & pestle sets (100mm, 65 mm, & 50mm sizes). Buchi V-700 Vacuum Pump & condenser Chemically resistant vacuum pump, flow rate 1.8m^3/h, ultimate vacuum less than 10mbar. The secondary condenser (Buchi 047180) is a complete module with insulation and 500mL receiving flask. Campden Instruments Vibrating Manual Tissue Cutter HA 752 Campden

  7. Contract Number DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Number DE-AC27-10RV15051 Modification 106 SF-30 Attachment Attachment DE-AC27-10RV15051 MODIFICATION 106 Replacement Pages (Total: 53, including this Cover Page)  Section B.1, Type of Contract - Items Being Acquired, Page B-8  Section H, Special Contract Requirements, Pages i, ii, and H-27  Section I, Contract Clauses, Pages I-1 thru I-48 222-S LAS&T Contract DE-AC27-10RV15051 Conformed thru Contract Modification No. 106 B-8 (e) OPTION PERIOD III: CLIN Number Description

  8. Pollution-control equipment (Brazil). Industrial waste-treatment equipment, September 1991. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    The Brazilian market for both solid and liquid industrial waste treatment equipment is promising in view of the expected growth in demand during the next 5 years. The estimated market demand in 1991 is US $243 million and is projected to grow 15% per year reaching US $370 million in 1994. The market for liquid waste equipment is about 85% of the total market for industrial waste equipment. Currently imports of pollution control equipment account for about 13% of the total market. Due to the recent import liberalization program implemented by the Government, local sources forecast the import share will increase to 20% by 1994.

  9. Contract DE-AC04-94AL85000

    National Nuclear Security Administration (NNSA)

    DE-AC04-94AL85000 Modification M508 Attachment 1 SECTION J APPENDIX C Special Bank Account Agreement (Updated Mod M271, M461, M497, M508) Intentionally left blank for Internet posting purposes

  10. The War of the Currents: AC vs. DC Power

    Office of Energy Efficiency and Renewable Energy (EERE)

    Nikola Tesla and Thomas Edison played key roles in the War of the Currents. Learn more about AC and DC power -- and how they affect our electricity use today.

  11. Compact AC susceptometer for fast sample characterization down...

    Office of Scientific and Technical Information (OSTI)

    Compact AC susceptometer for fast sample characterization down to 0.1 K Citation Details ... down to 0.1 K is demonstrated using several superconducting and magnetic materials. ...

  12. Contract DE-AC05-00OR22800

    National Nuclear Security Administration (NNSA)

    ... COMPLIANCE ACT EP NAP 70.2 07022010 PHYSICAL PROTECTION TR, TQ NFPA CODES AND STANDARDS 04231998 CODES AND STANDARDS EG, CP, FP DE-AC05-00OR22800 SECTION J, ATTACHMENT E ...

  13. Contract DE-AC04-94AL85000

    National Nuclear Security Administration (NNSA)

    DE-AC04-94AL85000 Modification M508 Attachment 1 SECTION J APPENDIX C Special Bank Account Agreement (Updated Mod M271, M461, M497, M508) Intentionally left blank for Internet ...

  14. Initial tests of an AC dipole for the Tevatron

    SciTech Connect (OSTI)

    Miyamoto, R.; Jansson, A.; Kopp, S.; Syphers, M.; /Fermilab

    2006-06-01

    The AC dipole is a device to diagnose transverse motions of a beam. It can achieve large-amplitude oscillations without two inevitable problems of conventional kicker/pinger magnets: decoherence and emittance growth. While not the first synchrotron to operate with an AC dipole, the Tevatron can now make use of its recently upgraded BPM system, providing unprecedented resolution for use with an AC dipole, to measure both linear and nonlinear properties of the accelerator. Plans are to provide AC dipole systems for both transverse degrees of freedom. Preliminary tests have been done using an audio power amplifier with an existing vertical pinger magnet, producing oscillation amplitudes up to 2{sigma} at 150 GeV. In this paper, we will present the configuration of this system. We also show the analysis of a first few data sets, including the direct measurement of beta functions at BPM locations.

  15. Master equipment list -- Phase 1. Revision 1

    SciTech Connect (OSTI)

    Jech, J.B.

    1995-04-28

    The purpose of this document is to define the system requirements for the Master Equipment List (MEL) Phase 1 project. The intended audience for this document includes Data Automation Engineering (DAE), Configuration Management Improvement and Control Engineering (CMI and CE), Data Administration Council (DAC), and Tank Waste Remedial System (TWRS) personnel. The intent of Phase 1 is to develop a user-friendly system to support the immediate needs of the TWRS labeling program. Phase 1 will provide CMI and CE the ability to administrate, distribute, and maintain key information generated by the labeling program. CMI and CE is assigning new Equipment Identification Numbers (EINs) to selected equipment in Tank Farms per the TWRS Data Standard ``Tank Farm Equipment Identification Number``. The MEL Phase 1 system will be a multi-user system available through the HLAN network. It will provide basic functions such as view, query, and report, edit, data entry, password access control, administration and change control. The scope of Phase 1 data will encompass all Tank Farm Equipment identified by the labeling program. The data will consist of fields from the labeling program`s working database, relational key references and pointers, safety class information, and field verification data.

  16. Alternative Fuels Data Center: Installing New E85 Equipment

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Installing New E85 Equipment to someone by E-mail Share Alternative Fuels Data Center: Installing New E85 Equipment on Facebook Tweet about Alternative Fuels Data Center: Installing New E85 Equipment on Twitter Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Google Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Delicious Rank Alternative Fuels Data Center: Installing New E85 Equipment on Digg Find More places to share Alternative Fuels Data

  17. Accelerator Production of {sup 225}Ac For Alpha-Immunotherapy

    SciTech Connect (OSTI)

    Weidner, J. W.; Nortier, F. M.; Bach, H. T.; John, K. D.; Couture, A.; Ullmann, J. L.; Fassbender, M. E.; Goff, G. S.; Taylor, W.; Valdez, F.; Wolfsberg, L. E.; Cisneros, M.; Dry, D.; Gallegos, M.; Gritzo, R.; Bitteker, L. J.; Wender, S.; Baty, R. S.

    2011-06-01

    {sup 225}Ac has tremendous potential for the treatment of metastatic cancer due to the four alpha-particles emitted during its decay to stable {sup 209}Bi. Additionally, it is one of the few alpha-emitters being considered for clinical trials. The anticipated {sup 225}Ac demand for these trials is expected to far exceed the annual worldwide supply of approximately 1,000 mCi/yr. Consequently, the DOE Office of Science has funded investigations into accelerator-based production of {sup 225}Ac. Existing {sup 232}Th(p,x){sup 225}Ac cross section data indicate that up to 480 mCi/day of {sup 225}Ac could be created by bombarding a thick target of natural thorium with 100 MeV protons at the Los Alamos Isotope Production Facility. To verify these predictions, experiments are underway at the Los Alamos Neutron Science Center to measure the {sup 232}Th(p,x){sup 225}Ac production cross sections for protons in the energy range 40-200 MeV, and at 800 MeV. For 800 MeV protons, preliminary results indicate that the {sup 225}Ac production cross section is 12.4{+-}0.6 mb and the {sup 225}Ra production cross section is 3.2{+-}0.2 mb. Moreover, preliminary results suggest that the {sup 227}Ac production cross section is 16{+-}1 mb. Experiments to measure these same cross sections at proton energies below 200 MeV are planned for the last half of calendar year 2010.

  18. An AC magnetohydrodynamic micropump: towards a true integrated microfluidic system

    SciTech Connect (OSTI)

    Lee, A P; Lemoff, A V; McConaghy, C F; Miles, R R

    1999-03-01

    An AC Magnetohydrodynamic (MHD) micropump has been demonstrated in which the Lorentz force is used to propel an electrolytic solution along a microchannel etched in silicon. This micropump has no moving parts, produces a continuous (not pulsatile) flow, and is compatible with solutions containing biological specimens. micropump, using the Lorentz force as the pumping mechanism for biological analysis. The AC Magnetohydrodynamic (MHD) micropump investigated produces a continuous flow and allows for complex microchannel design.

  19. Nuclear scientist honored by ACS for innovative studies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear scientist honored by ACS for innovative studies Nuclear scientist honored by ACS for innovative studies David L. Clark has been selected as the 2017 recipient of the Glenn T. Seaborg Award for Nuclear Chemistry. August 22, 2016 David L. Clark David L. Clark, recipient of the 2017 Glenn T. Seaborg Award for Nuclear Chemistry from the American Chemistry Society. Photo credit: Rod Searcey, Stanford, Calif. Contact Nancy Ambrosiano Communications Office (505) 667-0471 Email "None of

  20. Development of an AC Module System: Final Technical Report

    SciTech Connect (OSTI)

    Suparna Kadam; Miles Russell

    2012-06-15

    The GreenRay Inc. program focused on simplifying solar electricity and making it affordable and accessible to the mainstream population. This was accomplished by integrating a solar module, micro-inverter, mounting and monitoring into a reliable, 'plug and play' AC system for residential rooftops, offering the following advantages: (1) Reduced Cost: Reduction in installation labor with fewer components, faster mounting, faster wiring. (2) Maximized Energy Production: Each AC Module operates at its maximum, reducing overall losses from shading, mismatch, or module downtime. (3) Increased Safety. Electrical and fire safety experts agree that AC Modules have significant benefits, with no energized wiring or live connections during installation, maintenance or emergency conditions. (4) Simplified PV for a Broader Group of Installers. Dramatic simplification of design and installation of a solar power system, enabling faster and more efficient delivery of the product into the market through well-established, mainstream channels. This makes solar more accessible to the public. (5) Broadened the Rooftop Market: AC Modules enable solar for many homes that have shading, split roofs, or obstructions. In addition, due to the smaller building block size of 200W vs. 1000W, homeowners with budget limitations can start small and add to their systems over time. Through this DOE program GreenRay developed the all-in-one AC Module system with an integrated PV Module and microinverter, custom residential mounting and performance monitoring. Development efforts took the product from its initial concept, through prototypes, to a commercial product sold and deployed in the residential market. This pilot deployment has demonstrated the technical effectiveness of the AC Module system in meeting the needs and solving the problems of the residential market. While more expensive than the traditional central inverter systems at the pilot scale, the economics of AC Modules become more and more

  1. Diagnostics of the Fermilab Tevatron using an AC dipole

    SciTech Connect (OSTI)

    Miyamoto, Ryoichi; /Texas U.

    2008-08-01

    The Fermilab Tevatron is currently the world's highest energy colliding beam facility. Its counter-rotating proton and antiproton beams collide at 2 TeV center-of-mass. Delivery of such intense beam fluxes to experiments has required improved knowledge of the Tevatron's beam optical lattice. An oscillating dipole magnet, referred to as an AC dipole, is one of such a tool to non-destructively assess the optical properties of the synchrotron. We discusses development of an AC dipole system for the Tevatron, a fast-oscillating (f {approx} 20 kHz) dipole magnet which can be adiabatically turned on and off to establish sustained coherent oscillations of the beam particles without affecting the transverse emittance. By utilizing an existing magnet and a higher power audio amplifier, the cost of the Tevatron AC dipole system became relatively inexpensive. We discuss corrections which must be applied to the driven oscillation measurements to obtain the proper interpretation of beam optical parameters from AC dipole studies. After successful operations of the Tevatron AC dipole system, AC dipole systems, similar to that in the Tevatron, will be build for the CERN LHC. We present several measurements of linear optical parameters (beta function and phase advance) for the Tevatron, as well as studies of non-linear perturbations from sextupole and octupole elements.

  2. Novel Energy Conversion Equipment for Low Temperature Geothermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Novel Energy Conversion Equipment for Low Temperature Geothermal Resources Novel Energy Conversion Equipment for Low Temperature Geothermal Resources Project objective: Develop ...

  3. Use Lower Flammable Limit Monitoring Equipment to Improve Process...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lower Flammable Limit Monitoring Equipment to Improve Process Oven Efficiency Use Lower Flammable Limit Monitoring Equipment to Improve Process Oven Efficiency This process heating ...

  4. Radiation Detection Equipment Up and Running in Slovenia | National...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiation Detection Equipment Up and Running in Slovenia November 13, 2006 New Monitors ... Administration (NNSA) announced that radiation detection equipment to screen for ...

  5. Nantong Hongbo Windpower Equipment Co Ltd HWE | Open Energy Informatio...

    Open Energy Info (EERE)

    Nantong Hongbo Windpower Equipment Co Ltd HWE Jump to: navigation, search Name: Nantong Hongbo Windpower Equipment Co Ltd (HWE) Place: Nantong, Jiangsu Province, China Zip: 226371...

  6. Oil and Gas Lease Equipment and Operating Costs 1994 Through...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Natural Gas > Publications > Oil and Gas Lease Equipment and Operating Costs 1994 Through 2009 Oil and Gas Lease Equipment and Operating Costs 1994 Through 2009 Released: September ...

  7. PNC Bank Equipment Finance and Energy Group | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Name: PNC Bank - Equipment Finance and Energy Group Place: Valencia, California Zip: 91355 Product: Energy and Equipment Finance arm of PNC Bank...

  8. Changzhou Jiangnan Electrical Power Equipment Group Co Ltd |...

    Open Energy Info (EERE)

    Jiangnan Electrical Power Equipment Group Co Ltd Jump to: navigation, search Name: Changzhou Jiangnan Electrical Power Equipment Group Co., Ltd Place: Changzhou, Jiangsu Province,...

  9. MSA Apparatus Construction for Chemical Equipment Ltd | Open...

    Open Energy Info (EERE)

    MSA Apparatus Construction for Chemical Equipment Ltd Jump to: navigation, search Name: MSA Apparatus Construction for Chemical Equipment Ltd Place: United Kingdom Sector: Hydro,...

  10. Biogas, Solar, and Wind Energy Equipment Exemption | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biogas, Solar, and Wind Energy Equipment Exemption Biogas, Solar, and Wind Energy Equipment Exemption < Back Eligibility Commercial Industrial Residential Agricultural Multifamily...

  11. Hebei Yeelong Wind Power Equipment Manufacturing Co Ltd | Open...

    Open Energy Info (EERE)

    Yeelong Wind Power Equipment Manufacturing Co Ltd Jump to: navigation, search Name: Hebei Yeelong Wind Power Equipment Manufacturing Co Ltd Place: Hebei Province, China Sector:...

  12. Shenyang Tianxiang Wind Equipments Manufacturing Co Ltd | Open...

    Open Energy Info (EERE)

    Tianxiang Wind Equipments Manufacturing Co Ltd Jump to: navigation, search Name: Shenyang Tianxiang Wind Equipments Manufacturing Co., Ltd Place: Shenyang, Liaoning Province, China...

  13. Ningxia Yinxing Energy PV Power Equipment Manufacturing Co Ltd...

    Open Energy Info (EERE)

    Yinxing Energy PV Power Equipment Manufacturing Co Ltd Jump to: navigation, search Name: Ningxia Yinxing Energy PV Power Equipment Manufacturing Co Ltd Place: Yinchuan, Ningxia...

  14. Nordex Yinchuan Wind Power Equipment Manufacturing Co Ltd | Open...

    Open Energy Info (EERE)

    Yinchuan Wind Power Equipment Manufacturing Co Ltd Jump to: navigation, search Name: Nordex (Yinchuan) Wind Power Equipment Manufacturing Co. Ltd Place: Yinchuan, Ningxia...

  15. Yatu Yangjiang Fengdian Equipment Manufacturing Co Ltd | Open...

    Open Energy Info (EERE)

    Yatu Yangjiang Fengdian Equipment Manufacturing Co Ltd Jump to: navigation, search Name: Yatu (Yangjiang) Fengdian Equipment Manufacturing Co Ltd Place: Yangjiang, Guangdong...

  16. Nordex Dongying Wind Power Equipment Manufacturing Co Ltd | Open...

    Open Energy Info (EERE)

    Dongying Wind Power Equipment Manufacturing Co Ltd Jump to: navigation, search Name: Nordex (Dongying) Wind Power Equipment Manufacturing Co. Ltd. Place: Dongying, Shandong...

  17. Modular Process Equipment for Low Cost Manufacturing of High...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process Equipment for Low Cost Manufacturing of High Capacity Prismatic Li-Ion Cell Alloy Anodes Modular Process Equipment for Low Cost Manufacturing of High Capacity Prismatic Li-...

  18. Tuori Solar Energy Equipment Mfg Company | Open Energy Information

    Open Energy Info (EERE)

    Tuori Solar Energy Equipment Mfg Company Jump to: navigation, search Name: Tuori Solar Energy Equipment Mfg Company Place: Baoding, Hebei Province, China Zip: 71000 Sector: Solar...

  19. Zhangjiakou Kunyuan Wind Power Equipment Co | Open Energy Information

    Open Energy Info (EERE)

    Kunyuan Wind Power Equipment Co Jump to: navigation, search Name: Zhangjiakou Kunyuan Wind Power Equipment Co Place: Zhangjiakou, Hebei Province, China Sector: Wind energy Product:...

  20. Harbin Hafei Winwind Wind Power Equipment Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Hafei Winwind Wind Power Equipment Co Ltd Jump to: navigation, search Name: Harbin Hafei-Winwind Wind Power Equipment Co Ltd Place: Harbin, Heilongjiang Province, China Zip: 150060...

  1. Jilin Tianhe Wind Power Equipment Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Wind Power Equipment Co Ltd Jump to: navigation, search Name: Jilin Tianhe Wind Power Equipment Co Ltd Place: Baicheng, Jilin Province, China Sector: Wind energy Product:...

  2. Foshan Dongxing Fengying Wind Power Equipment Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Dongxing Fengying Wind Power Equipment Co Ltd Jump to: navigation, search Name: Foshan Dongxing Fengying Wind Power Equipment Co Ltd Place: Foshan, China Zip: 528000 Sector: Wind...

  3. Baoding Hengyi Wind Power Equipment Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Baoding Hengyi Wind Power Equipment Co Ltd Jump to: navigation, search Name: Baoding Hengyi Wind Power Equipment Co Ltd Place: Baoding, Hebei Province, China Product: Baoding-based...

  4. Harbin Wind Power Equipment Company | Open Energy Information

    Open Energy Info (EERE)

    Wind Power Equipment Company Jump to: navigation, search Name: Harbin Wind Power Equipment Company Place: Harbin, Heilongjiang Province, China Sector: Wind energy Product: A wind...

  5. Jiangsu Guoshen Wind Power Equipment Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Guoshen Wind Power Equipment Co Ltd Jump to: navigation, search Name: Jiangsu Guoshen Wind Power Equipment Co Ltd Place: Yancheng, Jiangsu Province, China Sector: Wind energy...

  6. Product Standards for Vending Equipment (Japan) | Open Energy...

    Open Energy Info (EERE)

    Vending Equipment (Japan) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Product Standards for Vending Equipment (Japan) Focus Area: Energy Efficiency Topics: Policy...

  7. Best Management Practice #9: Single-Pass Cooling Equipment |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    cooling include CAT scanners, degreasers, hydraulic equipment, condensers, air compressors, welding machines, vacuum pumps, ice machines, x-ray equipment, and air conditioners. ...

  8. Beijing Jingyi Century Automatic Equipment Co Ltd | Open Energy...

    Open Energy Info (EERE)

    beijing Jingyi Century Automatic Equipment Co Ltd Place: Beijing Municipality, China Zip: 100079 Product: A Chinese equipment manufacturer provides monosilicon ingot puller and...

  9. Process Equipment Cost Estimation, Final Report (Technical Report...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Process Equipment Cost Estimation, Final Report Citation Details In-Document Search Title: Process Equipment Cost Estimation, Final Report You are accessing a document from the ...

  10. Chinese Wind Energy Equipment Association CWEEA | Open Energy...

    Open Energy Info (EERE)

    Wind Energy Equipment Association CWEEA Jump to: navigation, search Name: Chinese Wind Energy Equipment Association (CWEEA) Place: Beijing, Beijing Municipality, China Zip: 100825...

  11. Varian Semiconductor Equipment Associates Inc VSEA | Open Energy...

    Open Energy Info (EERE)

    Varian Semiconductor Equipment Associates Inc VSEA Jump to: navigation, search Name: Varian Semiconductor Equipment Associates Inc (VSEA) Place: Gloucester, Massachusetts Zip: 1930...

  12. Community Wind Handbook/Purchase Equipment | Open Energy Information

    Open Energy Info (EERE)

    * Submit Permit Applications * Find an Installer * Purchase Equipment * Plan for Maintenance Purchase Equipment The purchase of a turbine for a small community wind project is...

  13. Beijing Zhongkexin Electronics Equipment Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Zhongkexin Electronics Equipment Co Ltd Jump to: navigation, search Name: Beijing Zhongkexin Electronics Equipment Co Ltd Place: Beijing Municipality, China Zip: 101111 Product: A...

  14. List of Food Service Equipment Incentives | Open Energy Information

    Open Energy Info (EERE)

    Refrigeration Equipment Food Service Equipment Yes Alabama Gas Corporation - Residential Natural Gas Rebate Program (Alabama) Utility Rebate Program Alabama Residential Furnaces...

  15. Updated Buildings Sector Appliance and Equipment Costs and Efficiency

    Gasoline and Diesel Fuel Update (EIA)

    characterizes most major residential equipment and commercial heating, cooling, and water heating equipment. Appendix A was used in developing Reference case projections, while...

  16. Dispensing Equipment Testing With Mid-Level Ethanol/Gasoline...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dispensing Equipment Testing With Mid-Level EthanolGasoline Test Fluid Dispensing Equipment Testing With Mid-Level EthanolGasoline Test Fluid The National Renewable Energy ...

  17. NREL: Energy Systems Integration Facility - Fixed Equipment and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photo of a man's gloved hands working on laboratory equipment. the Energy Systems Integration Facility, researchers have access to a variety of equipment to support energy systems ...

  18. Remote Control of Laboratory Equipment for Educational Purposes...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Remote Control of Laboratory Equipment for Educational Purposes This invention consists of a method to remote control many types of laboratory equipment that is typically found in ...

  19. Zhejiang DunAn Artificial Environmental Equipment Co Ltd | Open...

    Open Energy Info (EERE)

    DunAn Artificial Environmental Equipment Co Ltd Jump to: navigation, search Name: Zhejiang DunAn Artificial Environmental Equipment Co Ltd Place: Zhuji, Zhejiang Province, China...

  20. CRAD, Measuring and Testing Equipment Assessment Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Measuring and Testing Equipment Assessment Plan CRAD, Measuring and Testing Equipment Assessment Plan Performance Objective: The objective of this assessment is to determine ...

  1. Recovery Act Incentives for Wind Energy Equipment Manufacturing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act Incentives for Wind Energy Equipment Manufacturing Recovery Act Incentives for Wind Energy Equipment Manufacturing Document that lists some of the major federal ...

  2. How Do I Determine what Personal Protective Equipment (PPE) to...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Determine what Personal Protective Equipment (PPE) to Wear? Print General The ALS has a standard Personal Protective Equipment (PPE) policy that covers all activities on the...

  3. China SC Exact Equipment Co LTD | Open Energy Information

    Open Energy Info (EERE)

    SC Exact Equipment Co LTD Jump to: navigation, search Name: China SC Exact Equipment Co., LTD Place: Shenzhen, Guangdong Province, China Zip: 518125 Sector: Solar Product:...

  4. China Ordnance Equipment Group Corporation COEGC | Open Energy...

    Open Energy Info (EERE)

    China Ordnance Equipment Group Corporation COEGC Jump to: navigation, search Name: China Ordnance Equipment Group Corporation (COEGC) Place: Beijing Municipality, China Sector:...

  5. GT Solar Technologies formerly GT Equipment Technologies | Open...

    Open Energy Info (EERE)

    Technologies formerly GT Equipment Technologies Jump to: navigation, search Name: GT Solar Technologies (formerly GT Equipment Technologies) Place: Merrimack, New Hampshire...

  6. CXD 4605, Disposition Excess Equipment from Alpha 1 (4605)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Disposition Excess Equipment from Alpha 1 (4605) Y-12 Site Office Oak Ridge, Anderson County, Tennessee The proposed action is to characterize and disposition equipment that was...

  7. Best Management Practice #12: Laboratory and Medical Equipment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Best Management Practice 12: Laboratory and Medical Equipment Equipment used in hospitals ... Find more information on the alternative water sources best management practice. Explore ...

  8. Security Equipment and Systems Certification Program (SESCP)

    SciTech Connect (OSTI)

    Steele, B.J.; Papier, I.I.

    1996-06-20

    Sandia National Laboratories (SNL) and Underwriters Laboratories, Inc., (UL) have jointly established the Security Equipment and Systems Certification Program (SESCP). The goal of this program is to enhance industrial and national security by providing a nationally recognized method for making informed selection and use decisions when buying security equipment and systems. The SESCP will provide a coordinated structure for private and governmental security standardization review. Members will participate in meetings to identify security problems, develop ad-hoc subcommittees (as needed) to address these identified problems, and to maintain a communications network that encourages a meaningful exchange of ideas. This program will enhance national security by providing improved security equipment and security systems based on consistent, reliable standards and certification programs.

  9. Alternative technologies for cooling and refrigeration equipment

    SciTech Connect (OSTI)

    Matchett, J.

    1995-12-01

    Significant national and international attention has focused on the role that chlorofluorocarbons (CFCs) play in stratospheric ozone depletion. The Clean Air Act of 1990 calls for the production of the most harmful CFCs to completely cease by December 31, 1995. This production phaseout affects many CFC-refrigerants which are commonly used in commercial, residential, and industrial cooling processes. The production phaseout of CFCs will require owners of CFC-based refrigeration equipment to make plans to replace their equipment. Many equipment owners find themselves in a {open_quotes}rut{close_quotes}replacing CFCs with another chemical coolant, rather than a new cooling process. Since many of the chemical alternatives are structurally similar to CFCs (i.e., HCFCs, HFCs, and blends) they require minimal changes to current equipment. However, these substances are also believed to affect the global climate. Hence, they may not be the most environmentally sound alternative and probable are subject to other Federal regulations. There are other HVAC/R alternatives which are less environmentally damaging than these chemicals and may actually be more cost-effective and energy efficient and than the {open_quotes}traditional{close_quotes} CFC chemical substitutes. Alternative cooling technologies include absorption systems, desiccant cooling, evaporative cooling, and ammonia vapor compression. These alternative technologies are proven alternatives and are commercially available. Further, significant technological developments in recent years have made these technologies feasible alternatives for applications previously believed to be unacceptable. This paper describes these alternative technologies and the conditions in which they are viable alternatives to CFC-based equipment. Additionally, energy efficiency and life-cycle cost analysis considerations are addressed to provide a more completes analysis of cooling equipment alternatives.

  10. Conceptual design report, CEBAF basic experimental equipment

    SciTech Connect (OSTI)

    1990-04-13

    The Continuous Electron Beam Accelerator Facility (CEBAF) will be dedicated to basic research in Nuclear Physics using electrons and photons as projectiles. The accelerator configuration allows three nearly continuous beams to be delivered simultaneously in three experimental halls, which will be equipped with complementary sets of instruments: Hall A--two high resolution magnetic spectrometers; Hall B--a large acceptance magnetic spectrometer; Hall C--a high-momentum, moderate resolution, magnetic spectrometer and a variety of more dedicated instruments. This report contains a short description of the initial complement of experimental equipment to be installed in each of the three halls.

  11. INL Equipment to Aid Regional Response Team

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    INL Equipment to Aid Regional Response Team DOE-ID is transferring equipment to the Idaho Falls Police Department's Hazardous Materials Response Team for their use in responding to suspected hazardous devices. The new IFPD Team will be the Regional Response Team covering the I-15 corridor from Utah/Idaho border to the Montana/Idaho border. The IFPD Team will respond to the INL if/when we need them. Helping to outfit the IFPD Team will allow much more timely response on this side of the state.

  12. Appliance and Equipment Standards Program Logic Model

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manufacturers produce products with a high level of compliance that meet minimum energy conservation standards, resulting in energy savings in the buildings sector The Appliance & Equipment Standards Program promulgates energy conservation standards and test procedures in a rulemaking process to reduce energy consumption across residential, commercial, and industrial buildings. External Influences: DOE budget, Energy prices, Real estate market, Market incentives, Legislation / Regulation

  13. Right-Sizing Laboratory Equipment Loads

    SciTech Connect (OSTI)

    Frenze, David; Greenberg, Steve; Mathew, Paul; Sartor, Dale; Starr, William

    2005-11-29

    Laboratory equipment such as autoclaves, glass washers, refrigerators, and computers account for a significant portion of the energy use in laboratories. However, because of the general lack of measured equipment load data for laboratories, designers often use estimates based on 'nameplate' rated data, or design assumptions from prior projects. Consequently, peak equipment loads are frequently overestimated. This results in oversized HVAC systems, increased initial construction costs, and increased energy use due to inefficiencies at low part-load operation. This best-practice guide first presents the problem of over-sizing in typical practice, and then describes how best-practice strategies obtain better estimates of equipment loads and right-size HVAC systems, saving initial construction costs as well as life-cycle energy costs. This guide is one in a series created by the Laboratories for the 21st Century ('Labs21') program, a joint program of the U.S. Environmental Protection Agency and U.S. Department of Energy. Geared towards architects, engineers, and facilities managers, these guides provide information about technologies and practices to use in designing, constructing, and operating safe, sustainable, high-performance laboratories.

  14. DOE Hydrogen Storage Technical Performance Targets for Material Handling Equipment

    Broader source: Energy.gov [DOE]

    This table summarizes hydrogen storage technical performance targets for material handling equipment.

  15. US Contribution

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The steady state electrical network is an AC power substation and distribution system that ... Power feeds: 4 * 2 feeds: 400 kV substation transformer, 22 kV distribution to load ...

  16. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    SciTech Connect (OSTI)

    Not Available

    1986-07-01

    The United States Department of Energy (DOE), in accordance with its responsibility to encourage research and development in the energy area, awards grants of used energy-related laboratory equipment to universities and colleges and other nonprofit educational institutions of higher learning in the United States for use in energy-oriented educational programs in the life, physical and environmental sciences and engineering. Proposals for the grant of available equipment in this program should be submitted by eligible non-profit educational institution to the DOE Field Office responsible for the site where the specific equipment is known to be located.

  17. Novel Energy Conversion Equipment for Low Temperatures Geothermal Resources

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Energy Conversion Equipment for Low Temperatures Geothermal Resources Novel Energy Conversion Equipment for Low Temperatures Geothermal Resources Novel Energy Conversion Equipment for Low Temperatures Geothermal Resources presentation at the April 2013 peer review meeting held in Denver, Colorado. novel_energy_conversion_equipment_low_peer2013.pdf (582.04 KB) More Documents & Publications Novel Energy Conversion Equipment for Low Temperature Geothermal Resources

  18. Alternative Fuels Data Center: Onboard Idle Reduction Equipment for

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Heavy-Duty Trucks Onboard Idle Reduction Equipment for Heavy-Duty Trucks to someone by E-mail Share Alternative Fuels Data Center: Onboard Idle Reduction Equipment for Heavy-Duty Trucks on Facebook Tweet about Alternative Fuels Data Center: Onboard Idle Reduction Equipment for Heavy-Duty Trucks on Twitter Bookmark Alternative Fuels Data Center: Onboard Idle Reduction Equipment for Heavy-Duty Trucks on Google Bookmark Alternative Fuels Data Center: Onboard Idle Reduction Equipment for

  19. REAL ESTATE & EQUIPMENT LEASING / RENTAL CALIFORNIA LAWRENCE BERKELEY LAB

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REAL ESTATE & EQUIPMENT LEASING / RENTAL CALIFORNIA LAWRENCE BERKELEY LAB POC David Chen Telephone (510) 486-4506 Email dtchen@lbl.gov Construction, Mining, and Forestry Machinery and Equipment Rental and Leasing 532412 Office Machinery and Equipment Rental and Leasing 532420 LAWRENCE LIVERMORE LAB POC Jill Swanson Telephone (925) 423-4535 Email swanson6@llnl.gov Construction, Mining, and Forestry Machinery and Equipment Rental and Leasing 532412 Office Machinery and Equipment Rental and

  20. Best Management Practice #12: Laboratory and Medical Equipment | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 12: Laboratory and Medical Equipment Best Management Practice #12: Laboratory and Medical Equipment Equipment used in hospitals and laboratories can use significant amounts of water, offering the opportunity for substantial water savings by making a few small changes to how and when the water is used by the equipment. Water-consuming equipment in laboratories and medical facilities include water purification systems, sterilization and disinfection systems photographic and x-ray

  1. Alternative Fuels Data Center: Installing B20 Equipment

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Fuels & Vehicles » Biodiesel Printable Version Share this resource Send a link to Alternative Fuels Data Center: Installing B20 Equipment to someone by E-mail Share Alternative Fuels Data Center: Installing B20 Equipment on Facebook Tweet about Alternative Fuels Data Center: Installing B20 Equipment on Twitter Bookmark Alternative Fuels Data Center: Installing B20 Equipment on Google Bookmark Alternative Fuels Data Center: Installing B20 Equipment on Delicious Rank Alternative Fuels Data

  2. Appliance and Equipment Standards Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance and Equipment Standards Program Appliance and Equipment Standards Program Appliance and equipment standards are saving saving consumers and businesses billions of dollars. Appliance and equipment standards are saving saving consumers and businesses billions of dollars. The Building Technologies Office (BTO) implements minimum energy conservation standards for more than 60 categories of appliances and equipment. As a result of these standards, American consumers saved $63 billion on

  3. CRAD, Equipment and Piping Labeling Assessment Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Equipment and Piping Labeling Assessment Plan CRAD, Equipment and Piping Labeling Assessment Plan Performance Objective: To verify that facility equipment and piping are labeled in a manner such that facility personnel are able to positively identify equipment they operate. To ensure that an effective labeling program is in effect to reduce operator and maintenance errors from incorrect identification of equipment, to increase training effectiveness by tracing the actual facility system as

  4. System and method for determining stator winding resistance in an AC motor using motor drives

    DOE Patents [OSTI]

    Lu, Bin; Habetler, Thomas G; Zhang, Pinjia

    2013-02-26

    A system and method for determining the stator winding resistance of AC motors is provided. The system includes an AC motor drive having an input connectable to an AC source and an output connectable to an input terminal of an AC motor, a pulse width modulation (PWM) converter having switches therein to control current flow and terminal voltages in the AC motor, and a control system connected to the PWM converter. The control system generates a command signal to cause the PWM converter to control an output of the AC motor drive corresponding to an input to the AC motor, selectively generates a modified command signal to cause the PWM converter to inject a DC signal into the output of the AC motor drive, and determines a stator winding resistance of the AC motor based on the DC signal of at least one of the voltage and current.

  5. Superconducting shielded core reactor with reduced AC losses

    DOE Patents [OSTI]

    Cha, Yung S.; Hull, John R.

    2006-04-04

    A superconducting shielded core reactor (SSCR) operates as a passive device for limiting excessive AC current in a circuit operating at a high power level under a fault condition such as shorting. The SSCR includes a ferromagnetic core which may be either closed or open (with an air gap) and extends into and through a superconducting tube or superconducting rings arranged in a stacked array. First and second series connected copper coils each disposed about a portion of the iron core are connected to the circuit to be protected and are respectively wound inside and outside of the superconducting tube or rings. A large impedance is inserted into the circuit by the core when the shielding capability of the superconducting arrangement is exceeded by the applied magnetic field generated by the two coils under a fault condition to limit the AC current in the circuit. The proposed SSCR also affords reduced AC loss compared to conventional SSCRs under continuous normal operation.

  6. Measured Peak Equipment Loads in Laboratories

    SciTech Connect (OSTI)

    Mathew, Paul A.

    2007-09-12

    This technical bulletin documents measured peak equipment load data from 39 laboratory spaces in nine buildings across five institutions. The purpose of these measurements was to obtain data on the actual peak loads in laboratories, which can be used to rightsize the design of HVAC systems in new laboratories. While any given laboratory may have unique loads and other design considerations, these results may be used as a 'sanity check' for design assumptions.

  7. Chapter 10 - Property, Plant and Equipment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7-18-2011 Chapter 10-1 CHAPTER 10 PROPERTY, PLANT, AND EQUIPMENT 1. INTRODUCTION. a. Background/Authorities. This chapter describes financial controls over the acquisition, use, and retirement of property and provides guidelines for distinguishing between charges to capital accounts and charges to expense accounts consistent with the Statement of Federal Financial Accounting Standards (SFFAS). b. Applicability. The applicability of this chapter is specified in Chapter 1, "Accounting

  8. AC Loss Analysis on the Superconducting Coupling Magnet in MICE

    SciTech Connect (OSTI)

    Wu, Hong; Wang, Li; Green, Michael; Li, LanKai; Xu, FengYu; Liu, XiaoKun; Jia, LinXinag

    2008-07-08

    A pair of coupling solenoids is used in MICE experiment to generate magnetic field which keeps the muons within the iris of thin RF cavity windows. The coupling solenoids have a 1.5-meter inner diameter and will produce 7.4 T peak magnetic field. Three types of AC losses in coupling solenoid are discussed. The affect of AC losses on the temperature distribution within the cold mass during charging and rapid discharging process is analyzed also. The analysis result will be further confirmed by the experiment of the prototype solenoid for coupling solenoid, which will be designed, fabricated and tested at ICST.

  9. Contract No. DE-AC02-07CH11358

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC02-07CH11358 Modification No. 0171 Section B i PART I SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS TABLE OF CONTENTS PAGE NO. B.1 - SERVICE BEING ACQUIRED B-1 B.2 - OBLIGATION OF FUNDS AND FINANCIAL LIMITATIONS B-1 B.3 - PERFORMANCE AND OTHER INCENTIVE FEES B-1 B.4 - ALLOWABILITY OF SUBCONTRACTOR FEE B-3 B.5 - PROVISIONAL PAYMENT OF PERFORMANCE FEE B-3 Contract No. DE-AC02-07CH11358 Modification No. 0171 Section B B-1 PART I SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

  10. Contract Number DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    01 SF-30 Attachment Attachment DE-AC27-10RV15051 MODIFICATION 101 Replacement Pages (Total: 148, including this Cover Page)  Section J - entire section - pages J-1 thru J-147 222-S LAS&T Contract No. DE-AC27-10RV15051 Conformed thru Contract Modification No. 101 J-1 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J LIST OF ATTACHMENTS Table of Contents ATTACHMENT 1: DOE DIRECTIVES APPLICABLE TO THE 222-S LAB ............................................... 2

  11. Contract Number DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Number DE-AC27-10RV15051 Modification 100 SF-30 Attachment Attachment DE-AC27-10RV15051 MODIFICATION 100 Replacement Pages (Total: 37, including this Cover Page)  Section B.1, Type of Contract - Items Being Acquired, Page B-i and B-1  Section G.1(d), Electronic Media for Reports/Plans/Documents, Page G-1  Section J, Attachment 1, DOE Directives Applicable to the 222-S Lab, Pages J-1 thru J-3  Section J, Attachment 4, Washington Department of Labor Wage Determination, Pages

  12. Contract Number DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    15 SF-30 Attachment Attachment DE-AC27-10RV15051 MODIFICATION 115 Replacement Pages (Total: 24, including this Cover Page)  Section B, Supplies or Services and Prices/Costs, Pages B-i through B-17  Section F.1, Period of Performance, Pages i and F-1  Section H.26, Key Personnel, Pages i and H-32  Section J, Attachment 7, Performance Evaluation and Measurement Plan, Page J-127 222-S LAS&T Contract No. DE-AC27-10RV15051 Conformed thru Contract Modification No. 115 B-i PART I - THE

  13. Contract Number DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Number DE-AC27-10RV15051 Modification 116 SF-30 Attachment Attachment DE-AC27-10RV15051 MODIFICATION 116 Replacement Pages (Total: 21, including this Cover Page)  Section J, Attachment 7, Performance Evaluation and Measurement Plan, Pages J-127 thru J-146 ¡ ¢ £ ¤ ¢ ¥ ¦ § ¨ ©       ¨    ¡ ¤ §  ¡  ! "  # #  § ¨ © $ ¨  % & '  (  ) § ¨ ©      0 ¨ ' 1 $ 1 

  14. Direct Liquid Cooling for Electronic Equipment

    SciTech Connect (OSTI)

    Coles, Henry; Greenberg, Steve

    2014-03-01

    This report documents a demonstration of an electronic--equipment cooling system in the engineering prototype development stage that can be applied in data centers. The technology provides cooling by bringing a water--based cooling fluid into direct contact with high--heat--generating electronic components. This direct cooling system improves overall data center energy efficiency in three ways: High--heat--generating electronic components are more efficiently cooled directly using water, capturing a large portion of the total electronic equipment heat generated. This captured heat reduces the load on the less--efficient air--based data center room cooling systems. The combination contributes to the overall savings. The power consumption of the electronic equipment internal fans is significantly reduced when equipped with this cooling system. The temperature of the cooling water supplied to the direct cooling system can be much higher than that commonly provided by facility chilled water loops, and therefore can be produced with lower cooling infrastructure energy consumption and possibly compressor-free cooling. Providing opportunities for heat reuse is an additional benefit of this technology. The cooling system can be controlled to produce high return water temperatures while providing adequate component cooling. The demonstration was conducted in a data center located at Lawrence Berkeley National Laboratory in Berkeley, California. Thirty--eight servers equipped with the liquid cooling system and instrumented for energy measurements were placed in a single rack. Two unmodified servers of the same configuration, located in an adjacent rack, were used to provide a baseline. The demonstration characterized the fraction of heat removed by the direct cooling technology, quantified the energy savings for a number of cooling infrastructure scenarios, and provided information that could be used to investigate heat reuse opportunities. Thermal measurement data were used

  15. After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-load Equipment

    SciTech Connect (OSTI)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Margaret J.; Busch, John F.

    2004-01-22

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of ''miscellaneous'' plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from twelve commercial buildings in California, Georgia, and Pennsylvania: two health care buildings, two large offices (> 500 employees each), three medium offices (50-500 employees), four education buildings, and one ''small office'' that is actually an aggregate of five small businesses. Two buildings are in the San Francisco Bay area of California, five are in Pittsburgh, Pennsylvania, and five are in Atlanta

  16. Equipment design guidance document for flammable gas waste storage tank new equipment

    SciTech Connect (OSTI)

    Smet, D.B.

    1996-04-11

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas.

  17. Buildings Energy Data Book: 5.3 Heating, Cooling, and Ventilation Equipment

    Buildings Energy Data Book [EERE]

    5 Commercial Equipment Efficiencies Equipment Type Chiller Screw COP(full-load / IPLV) 2.80 / 3.05 2.80 / 3.05 3.02 / 4.45 Scroll COP 2.80 / 3.06 2.96 / 4.40 N.A. Reciprocating COP(full-load / IPLV) 2.80 / 3.05 2.80 / 3.05 3.52 / 4.40 Centrifugal COP(full-load / IPLV) 5.0 / 5.2 6.1 / 6.4 7.3 / 9.0 Gas-Fired Absorption COP 1.0 1.1 N.A. Gas-Fired Engine Driven COP 1.5 1.8 N.A. Rooftop A/C EER 10.1 11.2 13.9 Rooftop Heat Pump EER (cooling) 9.8 11.0 12.0 COP (heating) 3.2 3.3 3.4 Boilers Gas-Fired

  18. LANSCE | Lujan Center | Instruments | ASTERIX | Equipment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Equipment Surfaces and Interfaces Sample Environment: Magnet and cryostat system offering 0-1 T fields and 4-300 K temperatures. This system consists of an electromagnet or Helmholtz coil that produce fields up to 1T and 3 mT, respectively. A Displex cryostat (4-300 K) can be accommodated by either magnet. For samples with a dimension greater than 1 cm the maximum field is 0.6 T. Cryomagnet: The maximum field is 11 T for polarized or unpolarized beam experiments. We offer two 1.7 - 300 K sample

  19. Laboratory Equipment Donation Program - Contact Us

    Office of Scientific and Technical Information (OSTI)

    Contact Us If you have a question about the Laboratory Equipment Donation Program (LEDP), we recommend you check frequently asked questions. If your question still has not been answered or if you wish to send a comment, please see contact information below. Email EMAIL Email messages are answered Monday - Friday, 9 a.m. - 4 p.m. Telephone PHONE 865-241-6435 Mailing Address MAIL U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge,TN 37831 Additional

  20. AC05-00OR22725 with the U.S. Department...

    Office of Scientific and Technical Information (OSTI)

    LLC under Contract No. DE- AC05-00OR22725 with the U.S. Department of Energy. The United ... Nuclear Security Administration under contract DE-AC04-94AL85000. The work at Los ...

  1. Mission Support Contract Section J Contract No. DE-AC06-09RL14728

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section J Contract No. DE-AC06-09RL14728 J-5-1 ATTACHMENT J-5 PERFORMANCE GUARANTEE AGREEMENT Modification 479 Mission Support Contract Section J Contract No. DE-AC06-09RL14728 ...

  2. Sales and Use Tax Exemption for Electrical Generating Equipment

    Broader source: Energy.gov [DOE]

    Indiana does not have a specific sales and use tax exemption for equipment used in the production of renewable electricity. Therefore, such equipment is presumed to be subject to sales and use tax....

  3. Anne Arundel County- Solar and Geothermal Equipment Property Tax Credits

    Broader source: Energy.gov [DOE]

    Anne Arundel County offers a one-time credit from county property taxes on residential dwellings that use solar and geothermal energy equipment for heating and cooling, and solar energy equipment...

  4. Equipment acquisition plans for the SSCL magnet excitation power system

    SciTech Connect (OSTI)

    Winje, R.

    1993-05-01

    This report gives a brief description of the major electrical technical equipment used in the Superconducting Super Collider accelerators systems and the present laboratory plans for the acquisition of the equipment.

  5. Difficulty of Measuring Emissions from Heavy-Duty Engines Equipped...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Difficulty of Measuring Emissions from Heavy-Duty Engines Equipped with SCR and DPF Difficulty of Measuring Emissions from Heavy-Duty Engines Equipped with SCR and DPF In reference ...

  6. Removal of Process Gas Equipment Marks Portsmouth Site Cleanup...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Removal of Process Gas Equipment Marks Portsmouth Site Cleanup Milestone Clearing Away Process Gas Equipment Moves Portsmouth D&D Forward Crane operator Brian Lambert of Fluor-BWXT ...

  7. Best Management Practice #12: Laboratory and Medical Equipment

    Broader source: Energy.gov [DOE]

    Equipment used in hospitals and laboratories can use significant amounts of water, offering the opportunity for substantial water savings by making a few small changes to how and when the water is used by the equipment.

  8. Appendix D: Facility Process Data and Appendix E: Equipment Calibratio...

    Energy Savers [EERE]

    D: Facility Process Data and Appendix E: Equipment Calibration Data Sheets Appendix D: Facility Process Data and Appendix E: Equipment Calibration Data Sheets Docket No. EO-05-01: ...

  9. Property Tax Exemption for Residential Renewable Energy Equipment

    Broader source: Energy.gov [DOE]

    For Colorado property taxation purposes, solar energy facilities property used to produce two (2) megawatts or less of AC electricity and wind energy facilities property used to produce two (2) m...

  10. Contract No. DE-AC02-07CH11358 Contract Modification No. 0192

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Supplies Construction Services Containers Equipment Repair FlooringFurniture Laboratory Equipment Laboratory, Electrical & Safety Supplies MembershipsSubscriptions Metals ...

  11. Consider Steam Turbine Drives for Rotating Equipment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Steam Turbine Drives for Rotating Equipment Consider Steam Turbine Drives for Rotating Equipment This tip sheet outlines the benefits of steam turbine drives for rotating equipment as part of optimized steam systems. STEAM TIP SHEET #21 Consider Steam Turbine Drives for Rotating Equipment (January 2012) (398.66 KB) More Documents & Publications Improving Steam System Performance: A Sourcebook for Industry, Second Edition Adjustable Speed Drive Part-Load Efficiency Benchmark the Fuel Cost of

  12. WPN 13-7: Vehicle and Equipment Purchases

    Broader source: Energy.gov [DOE]

    To provide Grantee with guidance on purchasing vehicles and equipment for use in the Weatherization Assistance Program (WAP).

  13. Reduce Radiation Losses from Heating Equipment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radiation Losses from Heating Equipment Reduce Radiation Losses from Heating Equipment This tip sheet describes how to save process heating energy and costs by reducing expensive heat losses from industrial heating equipment, such as furnaces. PROCESS HEATING TIP SHEET #7 Reduce Radiation Losses from Heating Equipment (January 2006) (277.28 KB) More Documents & Publications Waste Heat Reduction and Recovery for Improving Furnace Efficiency, Productivity and Emissions Performance: A

  14. Appendix D: Facility Process Data and Appendix E: Equipment Calibration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Data Sheets | Department of Energy D: Facility Process Data and Appendix E: Equipment Calibration Data Sheets Appendix D: Facility Process Data and Appendix E: Equipment Calibration Data Sheets Docket No. EO-05-01: Appendix D: Facility Process Data and Appendix E: Equipment Calibration Data Sheets from Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia Appendix D: Facility Process Data and Appendix E: Equipment Calibration Data Sheets

  15. Novel Energy Conversion Equipment for Low Temperature Geothermal Resources

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Energy Conversion Equipment for Low Temperature Geothermal Resources Novel Energy Conversion Equipment for Low Temperature Geothermal Resources Project objective: Develop equipment that generates electricity from low temperature geothermal resources at a cost at least 20% below that of the currently available technology. low_kohler_energy_conversion.pdf (218.32 KB) More Documents & Publications Novel Energy Conversion Equipment for Low Temperatures Geothermal

  16. Hydrogen Equipment Certification Guide Webinar | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Equipment Certification Guide Webinar Hydrogen Equipment Certification Guide Webinar Access the recording and download the presentation slides from the Fuel Cell Technologies Office webinar "Hydrogen Equipment Certification Guide" held on December 10, 2015. Hydrogen Equipment Certification Guide Webinar Slides (2.8 MB) More Documents & Publications H2 Refuel H-Prize Safety Guidance Webinar H2 Refuel H-Prize Safety Guidance Webinar National Hydrogen Safety Training Resource for

  17. Purchasing Energy-Efficient Light Commercial Heating and Cooling Equipment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Purchasing Energy-Efficient Light Commercial Heating and Cooling Equipment Purchasing Energy-Efficient Light Commercial Heating and Cooling Equipment The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial central air conditioners (CACs). This equipment falls under the light commercial heating and cooling equipment product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies

  18. Heating Equipment Checklist for Winter Comfort and Efficiency | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Heating Equipment Checklist for Winter Comfort and Efficiency Heating Equipment Checklist for Winter Comfort and Efficiency December 19, 2014 - 10:59am Addthis Using our heating equipment checklist can help you properly maintain your heating system this winter! | Photo courtesy of iStockphoto.com/lionvision Using our heating equipment checklist can help you properly maintain your heating system this winter! | Photo courtesy of iStockphoto.com/lionvision Paige Terlip Paige Terlip

  19. Appliance and Equipment Standards Fact Sheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance and Equipment Standards Fact Sheet Appliance and Equipment Standards Fact Sheet Appliance and equipment efficiency standards have served as one of the nation's most effective policies for improving energy efficiency and saving consumers energy and money. Today, the U.S. Department of Energy's (DOE) Appliance and Equipment Standards Program covers more than 60 products, representing about 90% of home energy use, 60% of commercial building energy use, and 30% of industrial energy use.

  20. USSR report: Engineering and equipment, [May 15, 1985

    SciTech Connect (OSTI)

    1985-05-15

    This USSR Report contains articles on engineering and equipment. The main topics are marine and shipbuilding and nuclear energy.

  1. Use Lower Flammable Limit Monitoring Equipment to Improve Process Oven

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency | Department of Energy Lower Flammable Limit Monitoring Equipment to Improve Process Oven Efficiency Use Lower Flammable Limit Monitoring Equipment to Improve Process Oven Efficiency This process heating tip sheet recommends using lower flammable limit monitoring equipment to improve oven efficiency. PROCESS HEATING TIP SHEET #11 Use Lower Flammable Limit Monitoring Equipment to Improve Process Oven Efficiency (October 2007) (228.04 KB) More Documents & Publications Check

  2. Computers, Electronics and Electrical Equipment (2010 MECS) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Computers, Electronics and Electrical Equipment (2010 MECS) Computers, Electronics and Electrical Equipment (2010 MECS) Manufacturing Energy and Carbon Footprint for Computers, Electronics and Electrical Equipment Sector (NAICS 334, 335) Energy use data source: 2010 EIA MECS (with adjustments) Footprint Last Revised: February 2014 View footprints for other sectors here. Manufacturing Energy and Carbon Footprint Computers, Electronics and Electrical Equipment (123.71 KB) More Documents

  3. Field power measurements of imaging equipment

    SciTech Connect (OSTI)

    McWhinney, Marla; Homan, Gregory; Brown, Richard; Roberson, Judy; Nordman, Bruce; Busch, John

    2004-05-14

    According to the U.S. Department of Energy, electricity use by non-PC commercial office equipment is growing at an annual rate of nearly 5 percent (AEO 2003). To help address this growth in consumption, U.S. EPA periodically updates its ENERGY STAR specifications as products and markets change. This report presents background research conducted to help EPA update the ENERGY STAR specification for imaging equipment, which covers printers, fax machines, copiers, scanners, and multifunction devices (MFDs). We first estimated the market impact of the current ENERGY STAR imaging specification, finding over 90 percent of the current market complies with the specification. We then analyzed a sample of typical new imaging products, including 11 faxes, 57 printers and 19 copiers/MFD. For these devices we metered power levels in the most common modes: active/ready/sleep/off, and recorded features that would most likely affect energy consumption. Our metering indicates that for many products and speed bins, current models consume substantially less power than the current specification. We also found that for all product categories, power consumption varied most considerably across technology (i.e. inkjet vs. laser). Although inkjet printers consumed less energy than laser printers in active, ready and sleep-mode, they consumed more power on average while off, mostly due to the use of external power supplies. Based on these findings, we developed strategies for the ENERGY STAR program to achieve additional energy reductions. Finally, we present an assessment of manufacturer's ENERGY STAR labeling practices.

  4. Updated Buildings Sector Appliance and Equipment Costs and Efficiency

    U.S. Energy Information Administration (EIA) Indexed Site

    Full report (3.6 mb) Major residential equipment and commercial heating, cooling, & water heating equipment Appendix A - Technology Forecast Updates - Residential and Commercial Building Technologies - Reference Case (1 mb) Appendix B - Technology Forecast Updates - Residential and Commercial Building Technologies - Advanced Case (1 mb) Lighting and commercial ventilation & refrigeration equipment Appendix C - Technology Forecast Updates - Residential and Commercial Building Technologies

  5. Direct Heating Equipment- v2.0 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Direct Heating Equipment- v2.0 Direct Heating Equipment- v2.0 Direct Heating Equipment v2.0 (169.92 KB) More Documents & Publications Consumer Refrigerators-Freezers (Appendix A1) consumer Clothes Washers (Appendix J2) CONSUMER CLOTHES WASHERS (APPENDIX J2)

  6. DWPF liquid sample station: Status of equipment development

    SciTech Connect (OSTI)

    Caplan, J.R.

    1987-04-06

    This report summarizes operating experience and equipment status of the DWPF liquid sample cell. Operation hours to date, results of equipment inspections and problems encountered and their solutions are discussed. An equipment and instrumentation status updating DPST-85-592, DWPF LIQUID SAMPLE CELL MOCK-UP, is presented. Remaining development items are also outlined.

  7. Mission Support Contract Contract No. DE-AC06-09RL14728 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section J Modification 534 Mission Support Contract Contract No. DE-AC06-09RL14728 Section J Modification 534 Mission Support Contract Contract No. DE-AC06-09RL14728 Section J Modification 534 Mission Support Contract Contract No. DE-AC06-09RL14728 Section J Modification 534

  8. AC Losses in the MICE Channel Magnets -- Is This a Curse or aBlessing?

    SciTech Connect (OSTI)

    Green, M.A.; Wu, H.; Wang, L.; Kai, L.L.; Jia, L.X.; Yang, S.Q.

    2008-01-31

    This report discusses the AC losses in the MICE channelmagnets during magnet charging and discharging. This report talks aboutthe three types of AC losses in the MICE magnets; the hysteretic AC lossin the superconductor, the coupling AC loss in the superconductor and theeddy current AC loss in the magnet mandrel and support structure. AClosses increase the heat load at 4 K. The added heat load increases thetemperature of the second stage of the cooler. In addition, AC losscontributes to the temperature rise between the second stage cold headand the high field point of the magnet, which is usually close to themagnet hot spot. These are the curses of AC loss in the MICE magnet thatcan limit the rate at which the magnet can be charge or discharged. Ifone is willing to allow some of the helium that is around the magnet toboil away during a magnet charge or discharge, AC losses can become ablessing. The boil off helium from the AC losses can be used to cool theupper end of the HTS leads and the surrounding shield. The AC losses arepresented for all three types of MICE magnets. The AC loss temperaturedrops within the coupling magnet are presented as an example of how boththe curse and blessing of the AC losses can be combined.

  9. Oscillation phenomena of a plasma produced by an AC driven hot cathode

    SciTech Connect (OSTI)

    Takahashi, Yuki; Miyamoto, Naoki; Kasuya, Toshiro; Wada, Motoi

    2012-11-06

    Amplitude of oscillating discharge current has been measured for Bernas-type ion source equipped with an alternating current heated hot tungsten filament cathode. Measurements have been made by changing the filament diameter from 0.2 mm to 0.7 mm, and by changing the DC discharge current from 0.1 A to 1.5 A. The fluctuation amplitude of the discharge current was found decreased as the diameter of the filament was enlarged. The fluctuation amplitude took the minimum value at a frequency from several hundred Hz to 1 kHz depending upon the filament diameter and DC discharge current. For example, the relative oscillation amplitude was the smallest at 1 kHz for 0.7 mm diameter filament. Increase in discharge current had reduced the minimum oscillation amplitude, and increased the frequency at which the oscillating amplitude took the minimum. Fundamental mechanisms relevant to these characteristics of oscillation amplitude of discharge current from an AC driven hot cathode filament are discussed.

  10. 1997 Housing Characteristics Tables Home Office Equipment Tables

    U.S. Energy Information Administration (EIA) Indexed Site

    Percent of U.S. Households; 13 pages, 48 kb) Contents Pages HC7-1b. Home Office Equipment by Climate Zone, Percent of U.S. Households, 1997 1 HC7-2b. Home Office Equipment by Year of Construction, Percent of U.S. Households, 1997 1 HC7-3b. Home Office Equipment by Household Income, Percent of U.S. Households, 1997 1 HC7-4b. Home Office Equipment by Type of Housing Unit, Percent of U.S. Households, 1997 1 HC7-5b. Home Office Equipment by Type of Owner-Occupied Housing Unit, Percent of U.S.

  11. Emergency sacrificial sealing method in filters, equipment, or systems

    DOE Patents [OSTI]

    Brown, Erik P

    2014-09-30

    A system seals a filter or equipment component to a base and will continue to seal the filter or equipment component to the base in the event of hot air or fire. The system includes a first sealing material between the filter or equipment component and the base; and a second sealing material between the filter or equipment component and the base and proximate the first sealing material. The first sealing material and the second seal material are positioned relative to each other and relative to the filter or equipment component and the base to seal the filter or equipment component to the base and upon the event of fire the second sealing material will be activated and expand to continue to seal the filter or equipment component to the base in the event of hot air or fire.

  12. Optimization of spin-torque switching using AC and DC pulses

    SciTech Connect (OSTI)

    Dunn, Tom; Kamenev, Alex

    2014-06-21

    We explore spin-torque induced magnetic reversal in magnetic tunnel junctions using combined AC and DC spin-current pulses. We calculate the optimal pulse times and current strengths for both AC and DC pulses as well as the optimal AC signal frequency, needed to minimize the Joule heat lost during the switching process. The results of this optimization are compared against numeric simulations. Finally, we show how this optimization leads to different dynamic regimes, where switching is optimized by either a purely AC or DC spin-current, or a combination AC/DC spin-current, depending on the anisotropy energies and the spin-current polarization.

  13. On-Chip AC self-test controller

    DOE Patents [OSTI]

    Flanagan, John D.; Herring, Jay R.; Lo, Tin-Chee

    2009-09-29

    A system for performing AC self-test on an integrated circuit that includes a system clock for normal operation is provided. The system includes the system clock, self-test circuitry, a first and second test register to capture and launch test data in response to a sequence of data pulses, and a logic circuit to be tested. The self-test circuitry includes an AC self-test controller and a clock splitter. The clock splitter generates the sequence of data pulses including a long data capture pulse followed by an at speed data launch pulse and an at speed data capture pulse followed by a long data launch pulse. The at speed data launch pulse and the at speed data capture pulse are generated for a common cycle of the system clock.

  14. AVTA: Aerovironment AC Level 2 Charging System Testing Results

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results from testing done on the Aerovironment AC Level 2 charging system for plug-in electric vehicles. This research was conducted by Idaho National Laboratory.

  15. AVTA: Clipper Creek AC Level 2 Charging System Testing Results

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results from testing done on the ClipperCreek AC Level 2 charging system for plug-in electric vehicles. This research was conducted by Idaho National Laboratory.

  16. AVTA: Blink AC Level 2 Charging System Testing Results

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results from testing done on the Blink AC Level 2 charging system for plug-in electric vehicles. This research was conducted by Idaho National Laboratory.

  17. Simultaneous distribution of AC and DC power - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electricity Transmission Electricity Transmission Early Stage R&D Early Stage R&D Find More Like This Return to Search Simultaneous distribution of AC and DC power National Renewable Energy Laboratory Contact NREL About This Technology Technology Marketing Summary According to the U.S. Energy Information Administration's 2010 International Energy Outlook, solar energy is expected to grow globally by 12.7% per year until 2035; more than any other renewable energy source. The growth of

  18. Performance testing of the AC propulsion ELX electric vehicle

    SciTech Connect (OSTI)

    Kramer, W.E.; MacDowall, R.D.; Burke, A.F.

    1994-06-01

    Performance testing of the AC Propulsion ELX electric vehicle is described. Test data are presented and analyzed. The ELX vehicle is the first of a series of electric vehicles of interest to the California Air Resources Board. The test series is being conducted under a Cooperative Research and Development Agreement (CRADA) between the US Department of energy and the California Air Resources Board. The tests which were conducted showed that the AC Propulsion ELX electric vehicle has exceptional acceleration and range performance. when the vehicle`s battery was fully charged, the vehicle can accelerate from 0 to 96 km/h in about 10 seconds. Energy consumption and range tests using consecutive FUDS and HWFET Driving cycles (the all-electric cycle) indicate that the energy economy of the AC Propulsion ELX electric vehicle with regenerative braking is 97 W{center_dot}h/km, with a range of 153 km (95 miles). Computer simulations performed using the SIMPLEV Program indicate that the vehicle would have a range of 327 km (203 miles) on the all-electric cycle if the lead acid batteries were replaced with NiMH batteries having an energy density of 67 W{center_dot}h/kg. Comparisons of FUDS test data with and without regenerative braking indicated that regenerative braking reduced the energy consumption of the ELX vehicle by approximately 25%.

  19. AC electrokinetic manipulation of selenium nanoparticles for potential nanosensor applications

    SciTech Connect (OSTI)

    Mahmoodi, Seyed Reza; Bayati, Marzieh; Hosseinirad, Somayeh; Foroumadi, Alireza; Gilani, Kambiz; Rezayat, Seyed Mahdi

    2013-03-15

    Highlights: ? Se nanoparticles were synthesized using a reverse-microemulsion process. ? AC osmotic fluid flow repulses the particles from electrode edges. ? Dielectrophoretic force attracts the particles to electrode edges. ? Dielectrophoresis electrode showed non-ohmic behavior. ? The device can potentially be used as a nanosensor. - Abstract: We report the AC electrokinetic behavior of selenium (Se) nanoparticles for electrical characterization and possible application as micro/nano devices. selenium Se nanoparticles were successfully synthesized using a reverse-microemulsion process and investigated structurally using X-ray diffraction and transmission electron microscope. Interdigitated castellated ITO and non-castellated platinum electrodes were employed for manipulation of suspended materials in the fluid. Using ITO electrodes at low frequency limits resulted in deposition of Se particles on electrode surface. When Se particles exposed to platinum electrodes in the 10 Hz1 kHz range and V {sub p?p}> 8, AC osmotic fluid flow repulses the particles from electrode edges. However, in 10 kHz10 MHz range and V {sub p?p}> 5, dielectrophoretic force attracts the particles to electrode edges. As the Se particle concentration increased, the trapped Se particles were aligned along the electric field line and bridged the electrode gap. The device was characterized and can potentially be useful in making micro/nano electronic devices.

  20. Cost estimate of initial SSC experimental equipment

    SciTech Connect (OSTI)

    1986-06-01

    The cost of the initial detector complement at recently constructed colliding beam facilities (or at those under construction) has been a significant fraction of the cost of the accelerator complex. Because of the complexity of large modern-day detectors, the time-scale for their design and construction is comparable to the time-scale needed for accelerator design and construction. For these reasons it is appropriate to estimate the cost of the anticipated detector complement in parallel with the cost estimates of the collider itself. The fundamental difficulty with this procedure is that, whereas a firm conceptual design of the collider does exist, comparable information is unavailable for the detectors. Traditionally, these have been built by the high energy physics user community according to their perception of the key scientific problems that need to be addressed. The role of the accelerator laboratory in that process has involved technical and managerial coordination and the allocation of running time and local facilities among the proposed experiments. It seems proper that the basic spirit of experimentation reflecting the scientific judgment of the community should be preserved at the SSC. Furthermore, the formal process of initiation of detector proposals can only start once the SSC has been approved as a construction project and a formal laboratory administration put in place. Thus an ad hoc mechanism had to be created to estimate the range of potential detector needs, potential detector costs, and associated computing equipment.

  1. Workshop on environmental qualification of electric equipment

    SciTech Connect (OSTI)

    Lofaro, R.; Gunther, W.; Villaran, M.; Lee, B.S.; Taylor, J.

    1994-05-01

    Questions concerning the Environmental Qualification (EQ) of electrical equipment used in commercial nuclear power plants have recently become the subject of significant interest to the US Nuclear Regulatory Commission (NRC). Initial questions centered on whether compliance with the EQ requirements for older plants were adequate to support plant operation beyond 40 years. After subsequent investigation, the NRC Staff concluded that questions related to the differences in EQ requirements between older and newer plants constitute a potential generic issue which should be evaluated for backfit, independent of license renewal activities. EQ testing of electric cables was performed by Sandia National Laboratories (SNL) under contract to the NRC in support of license renewal activities. Results showed that some of the environmentally qualified cables either failed or exhibited marginal insulation resistance after a simulated plant life of 20 years during accident simulation. This indicated that the EQ process for some electric cables may be non-conservative. These results raised questions regarding the EQ process including the bases for conclusions about the qualified life of components based upon artificial aging prior to testing.

  2. Tools and Equipment Modeling for Automobile Interactive Assembling Operating Simulation

    SciTech Connect (OSTI)

    Wu Dianliang; Zhu Hongmin

    2010-05-21

    Tools and equipment play an important role in the simulation of virtual assembly, especially in the assembly process simulation and plan. Because of variety in function and complexity in structure and manipulation, the simulation of tools and equipments remains to be a challenge for interactive assembly operation. Based on analysis of details and characteristics of interactive operations for automobile assembly, the functional requirement for tools and equipments of automobile assembly is given. Then, a unified modeling method for information expression and function realization of general tools and equipments is represented, and the handling methods of manual, semi-automatic, automatic tools and equipments are discussed. Finally, the application in assembly simulation of rear suspension and front suspension of Roewe 750 automobile is given. The result shows that the modeling and handling methods are applicable in the interactive simulation of various tools and equipments, and can also be used for supporting assembly process planning in virtual environment.

  3. US ITER | About

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Steady-State Electrical Network is an AC power substation and distribution system that supplies electrical power to all ITER conventional systems and facilities. A separate ...

  4. Covered Product Category: Imaging Equipment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Imaging Equipment Covered Product Category: Imaging Equipment The Federal Energy Management Program (FEMP) provides acquisition guidance for imaging equipment, a product category covered by the ENERGY STAR program. Federal laws and requirements mandate that agencies buy ENERGY STAR qualified products in all product categories covered by this program and any acquisition actions that are not specifically exempted by law. MEETING EFFICIENCY REQUIREMENTS FOR FEDERAL PURCHASES The U.S. Environmental

  5. Webinar: Analysis Using Fuel Cell Material Handling Equipment for Shaving

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Peak Building Energy | Department of Energy Analysis Using Fuel Cell Material Handling Equipment for Shaving Peak Building Energy Webinar: Analysis Using Fuel Cell Material Handling Equipment for Shaving Peak Building Energy Access the recording and download the presentation slides from the Fuel Cell Technologies Office webinar "Analysis Using Fuel Cell Material Handling Equipment (MHE) for Shaving Peak Building Energy" held on August 11, 2015. Analysis Using Fuel Cell MHE for

  6. Microgrid Equipment Selection and Control | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Microgrid Equipment Selection and Control Microgrid Equipment Selection and Control Project Objective The U.S.-China Clean Energy Research Center (CERC) is a pioneering research and development (R&D) consortium bringing together governments, key policymakers, researchers, and industry to develop a long-term platform for sustainable U.S.-China joint R&D. Ultra-efficient buildings and microgrids require complex optimization both for operations and when choosing equipment. This CERC project

  7. Lab Equipment & Capability | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab Equipment & Capability Lab Equipment & Capability Here you will find a list of the equipment and capabilities currently installed in PARC labs. This list will be updated as more information becomes available. Bocian Group: Laboratory: D. F. Bocian has ~2500 sq. ft. of laboratory space including both wet labs and instrument labs. These labs contain ~10 pentium-based PCs for routine computing applications. Laser Raman Facility-A complete laser Raman facility is available for the

  8. Alternative Fuel and Advanced Technology Commercial Lawn Equipment (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2014-10-01

    The U.S. Department of Energy's Clean Cities program produced this guide to help inform the commercial mowing industry about product options and potential benefits. This guide provides information about equipment powered by propane, ethanol, compressed natural gas, biodiesel, and electricity, as well as advanced engine technology. In addition to providing an overview for organizations considering alternative fuel lawn equipment, this guide may also be helpful for organizations that want to consider using additional alternative fueled equipment.

  9. Alternative Fuel and Advanced Technology Commercial Lawn Equipment

    SciTech Connect (OSTI)

    2014-10-10

    The U.S. Department of Energy's Clean Cities program produced this guide to help inform the commercial mowing industry about product options and potential benefits. This guide provides information about equipment powered by propane, ethanol, compressed natural gas, biodiesel, and electricity, as well as advanced engine technology. In addition to providing an overview for organizations considering alternative fuel lawn equipment, this guide may also be helpful for organizations that want to consider using additional alternative fueled equipment.

  10. DOE Reaches Settlements with Three Commercial Refrigeration Equipment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manufacturers | Department of Energy Reaches Settlements with Three Commercial Refrigeration Equipment Manufacturers DOE Reaches Settlements with Three Commercial Refrigeration Equipment Manufacturers March 1, 2016 - 6:20pm Addthis DOE settled enforcement actions against Utility Refrigerator, True Manufacturing, and Victory Refrigeration for distributing commercial refrigeration equipment in the United States that do not meet applicable energy conservation standards. As a part of the

  11. Hanford Site Evaluation of Electrical Equipment for Beryllium Procedure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2-005 Revision 0 Hanford Site Evaluation of Electrical Equipment for Beryllium Procedure Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Approved for Public Release; Further Dissemination Unlimited DOE-0342-005, Rev. 0 Hanford Site Evaluation of Electrical Equipment for Beryllium Procedure Published Date: 09-19-2013 Effective Date: 05-14-2014 Signature Page 1 of 1 DOE-0342-005, Rev. 0 Hanford Site Evaluation of Electrical Equipment for Beryllium

  12. Healthcare Energy: Spotlight on Medical Equipment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Medical Equipment Healthcare Energy: Spotlight on Medical Equipment The Building Technologies Office conducted a healthcare energy end-use monitoring project in partnership with two hospitals. Additional plug load data from medical office buildings were provided by Mazzetti, Inc. See below for a few highlights from monitoring large medical imaging equipment and medical office building plug loads. Graphic showing the average weekday energy use of a CT machine. Graph showing average weekday energy

  13. Novel Energy Conversion Equipment for Low Temperature Geothermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Novel Energy Conversion Equipment for Low Temperature Geothermal Resources Jay Kohler Eric Minor Johnson Controls, Inc. Geothermal Energy Production from Low Temperature Resources ...

  14. Use Lower Flammable Limit Monitoring Equipment to Improve Process...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LFL monitoring equipment can improve the efficiency of the solvent removal process and ... drive on the exhaust system fan can improve process efficiency even further (damper ...

  15. Best Management Practice #9: Single-Pass Cooling Equipment |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    degreasers, hydraulic equipment, condensers, air compressors, welding machines, vacuum ... Installation of a chiller and cooling tower or an air-cooled chiller may also be an ...

  16. Operating Experience Level 3, Industrial Equipment Impacts Infrastruct...

    Energy Savers [EERE]

    mission and schedule, divert resources, and change momentum. PDF icon OE-3 2014-06: Industrial Equipment Impacts infrastructure More Documents & Publications Operating...

  17. Zhonghua Hongda Energy Equipment Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    China Product: The company's expertise, equipment and installations help enterprises to reduce the energy demand. Coordinates: 39.90601, 116.387909 Show Map Loading...

  18. Philadelphia Gas Works- Residential and Small Business Equipment Rebate Program

    Broader source: Energy.gov [DOE]

    Philadelphia Gas Works' (PGW) Residential Heating Equipment rebates are available to all PGW residential or small business customers installing high efficiency boilers and furnaces, and programma...

  19. US Recovery Act Smart Grid Projects - Equipment Manufacturing...

    Open Energy Info (EERE)

    US Recovery Act Smart Grid Projects - Equipment Manufacturing Jump to: navigation, search CSV Loading map... "format":"googlemaps3","type":"ROADMAP","types":"ROADMAP","SATELLITE"...

  20. Reduction of fire hazards on large mining equipment

    SciTech Connect (OSTI)

    Maria I. De Rosa

    2008-09-15

    Although standards and regulations are in place to prevent large mining equipment fires, recent analyses of mine accident data show that mining equipment fires still occur with alarming frequency and grave consequences, particularly at all surface mines and in underground metal/nonmetal mines. Recently technological advances in fire protection, combined with the statistical data on equipment fires, led NIOSH to reinvestigate this and to improve operator safety. NIOSH demonstrated that newly developed technologies, such as dual cab fire inerting systems and engine compartment fire barriers, can greatly enhance operator safety and lessen the damage of property during large mobile equipment fires. 10 refs., 5 figs.

  1. Tianjin Huaneng Energy Equipment Company | Open Energy Information

    Open Energy Info (EERE)

    Tianjin, Tianjin Municipality, China Zip: 301900 Product: Focused on producing energy saving boilers and radiator equipment. Coordinates: 39.231831, 117.878502 Show Map...

  2. 1999 Commercial Buildings Characteristics--End-Use Equipment

    U.S. Energy Information Administration (EIA) Indexed Site

    586-8800. Energy Information Administration Commercial Buildings Energy Consumption Survey Cooling Equipment Packaged air conditioning units were the predominant type of cooling...

  3. Appliance and Equipment Standards Program Overview - 2016 BTO...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This presentation at the 2016 Peer Review provided an overview of the Building Technologies Office's Appliance and Equipment Standards Program. Through robust feedback, the BTO ...

  4. Shenyang Tendo New Energy Equipment Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    developemnt. It vows to form a complete wind indsutry value chain from equipment manufacture to wind farm development. Coordinates: 41.788509, 123.40612 Show Map Loading...

  5. Veeco Solar Equipment formerly Mill Lane Engineering | Open Energy...

    Open Energy Info (EERE)

    corporation that designs, builds, and integrates custom solar equipment and flexible solar panel coating systems. Coordinates: 43.33937, -88.817939 Show Map Loading map......

  6. Baicheng Miracle Equipment Machinery Company Ltd | Open Energy...

    Open Energy Info (EERE)

    energy Product: A wind equipment manufacturer, jointly established by Jiangsu Miracle Logistics System Engineering Ltd and Baicheng Tongye Ltd. Coordinates: 45.234879,...

  7. Cold-Start Emissions Control in Hybrid Vehicles Equipped with...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Adsorber for Hydrocarbons and NOx Cold-Start Emissions Control in Hybrid Vehicles Equipped with a Passive Adsorber for Hydrocarbons and NOx Reports results from study of ...

  8. Selected antitrust issues in utility fuels and equipment purchases

    SciTech Connect (OSTI)

    Sanger, H.S. Jr.

    1980-11-10

    The effects of cartels on the acquisition of fuels and equipment for US power plants and examples of antitrust suits dealing with this subject are discussed. (LCL)

  9. Nanjing Sunec Wind Generator Equipment Factory | Open Energy...

    Open Energy Info (EERE)

    211100 Sector: Wind energy Product: A Chinese manufacturer for power supply, grid automation equipment and small-to-medium wind turbines, as well as a wind project developer....

  10. Updated Buildings Sector Appliance and Equipment Costs and Efficiency

    Gasoline and Diesel Fuel Update (EIA)

    Full report (4.1 mb) Heating, cooling, & water heating equipment Appendix A - Technology Forecast Updates - Residential and Commercial Building Technologies - Reference Case (1.9...

  11. Balance-of-System Equipment Required for Renewable Energy Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... For both stand-alone and grid-connected systems, you will need power conditioning equipment. Most electrical appliances ... Virtually all the available renewable energy technologies, ...

  12. Cold test data for equipment acceptance into 105-KE Basin

    SciTech Connect (OSTI)

    Packer, M.J.

    1994-11-09

    This document provides acceptance testing of equipment to be installed in the 105-KE Basin for pumping sludge to support the discharge chute barrier doors installation.

  13. Condensing Heating and Water Heating Equipment Workshop Location...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Condensing Heating and Water Heating Equipment Workshop Location: Washington Gas Light Appliance Training Facility 6801 Industrial Road Springfield, VA Date: October 9, 2014 Time: ...

  14. Balance-of-System Equipment Required for Renewable Energy Systems |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Balance-of-System Equipment Required for Renewable Energy Systems Balance-of-System Equipment Required for Renewable Energy Systems Both grid-connected and off-grid home renewable energy systems require additional “balance-of-system” equipment. Both grid-connected and off-grid home renewable energy systems require additional "balance-of-system" equipment. Whether you decide to connect your home renewable energy system to the electric grid or not, you

  15. Consider Steam Turbine Drives for Rotating Equipment, Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Consider Steam Turbine Drives for Rotating Equipment Steam turbines are well suited as ... This service generally calls for a backpressure noncondensing steam turbine. The ...

  16. Ramgraber Semiconductor Equipment GmbH | Open Energy Information

    Open Energy Info (EERE)

    Zip: 85649 Sector: Solar Product: Makes semiconductor processing equipment, including solar cell manufacturing lines. Coordinates: 48.006898, 11.684687 Show Map Loading...

  17. Solar Resource Measurements at FPL Energy … Equipment Only:...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Number: CRD-08-283 CRADA Title: Solar Resource Measurements at FPL Energy - Equipment Only Joint Work ... solar irradiance are important for developing renewable resource data. ...

  18. Direct Heating Equipment- v1.0 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    File Direct Heating Equipment - v1.0 More Documents & Publications Refrigerators and Refrigerator-Freezers (Appendix A1 after May 2, 2011) Residential Refrigerators-Freezers ...

  19. Validation of International Atomic Energy Agency Equipment Performance Requirements

    SciTech Connect (OSTI)

    Chiaro, PJ

    2004-02-17

    Performance requirements and testing protocols are needed to ensure that equipment used by the International Atomic Energy Agency (IAEA) is reliable. Oak Ridge National Laboratory (ORNL), through the US Support Program, tested equipment to validate performance requirements protocols used by the IAEA for the subject equipment categories. Performance protocol validation tests were performed in the Environmental Effects Laboratory in the categories for battery, DC power supply, and uninterruptible power supply (UPS). Specific test results for each piece of equipment used in the validation process are included in this report.

  20. Shenzhen Hekeda Ultrasonic Equipment Co | Open Energy Information

    Open Energy Info (EERE)

    Hekeda Ultrasonic Equipment Co Place: Shenzhen, Guangdong Province, China Product: A Chinese company specializes in ultrasonic cleaning. Coordinates: 22.546789, 114.112556...

  1. Data Center Efficiency and IT Equipment Reliability at Wider...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Data Center Efficiency and IT Equipment Reliability at Wider Operating Temperature and Humidity Ranges provides an overview of how operators of data centers can increase energy ...

  2. Energy Efficient Equipment Product Model Listings | Open Energy...

    Open Energy Info (EERE)

    energy efficiency of different equipment and appliance models. Products are identified as ENERGY STAR qualified andor regulated in Canada under the Energy Efficiency Regulations....

  3. Laboratory Equipment Donation Program - On-Line Application

    Office of Scientific and Technical Information (OSTI)

    Control Number and the Equipment Name. Please do not leave any required field blank; if no information is available, enter an "X". * denotes required fields. Item Control Number: ...

  4. Environment/Health/Safety (EHS): Personal Protective Equipment...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EHS Occupational Safety Safety Group Home Electrical Safety Ergonomics ISM Occupational Safety Group Organization Personal Protective Equipment (PPE) Injury Review & Analysis...

  5. Baoding Solar Thermal Equipment Company | Open Energy Information

    Open Energy Info (EERE)

    Equipment Company Place: Baoding, Hebei Province, China Sector: Solar Product: Solar water heating system manufacturer. Coordinates: 38.855011, 115.480217 Show Map Loading...

  6. Microsoft Word - 052606 Final Pepco DOE maintenance notice.doc

    Energy Savers [EERE]

    Pepco has scheduled an outage at the Potomac River substation to make necessary repairs to Pepco equipment at that substation. PJM has scheduled and approved this outage to occur ...

  7. Microsoft Word - DOE-ID-INL-15-013 R1.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    R1 SECTION A. Project Title: Test Reactor Area (TRA)-774 Substation Equipment Upgrades ... Electricity for heat at the Advanced Test Reactor (ATR) heaters is fed from the substation ...

  8. Contract No. DE-AC04-94AL85000

    National Nuclear Security Administration (NNSA)

    Contract No. DE-AC04-94AL85000 Modification No. 473 Page 2 of 36 1. Section B, Clause B-2, Contract Type and Value is amended as follows: (i) Paragraph (b) is revised to add the total estimated cost entry under "Contract Periods" and "Estimated Cost" for FY 2013, changing the "TOTAL through" entry, and adding a place holder for the two option periods as follows: Add: October 1, 2012 through September 30, 2013 $ 2,462,698,305 Option 1: October 1, 2013 through $ TBD*

  9. Hysteresis and limiting cycles in a high frequency ac field

    SciTech Connect (OSTI)

    Klik, I.; Yao, Y. D.

    2001-06-01

    Numerical solutions of Brown{close_quote}s Fokker-Planck equation are used to analyze the response of a superparamagnetic particle to an ac applied field. The nature of the response is governed by the rate of intrawell relaxation processes: At low driving frequencies they maintain the system close to a quasistationary state, and the response is Markovian. By contrast, probability redistribution effects taking place at high frequencies lead to a non-Markovian response mode which displays memory phenomena. The high frequency limiting cycles are analyzed in detail, and the transition to conventional low frequency hysteresis loops is discussed. {copyright} 2001 American Institute of Physics.

  10. Contract DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract DE-AC27-08RV14800 Modification 105 SF30 Continuation Page, Block 14 Page 2 of 22 Purpose of Modification: The purpose of this modification is to do the following: 1. Definitize the contract Change Order issued in modification 084 to implement the removal of the Californium Sources. The addition of this new requirement increases the cost of CLIN 1 by $298,254 and increases fee in the amount of $26,843, for a total increase in contract value of $325,097. 2. Update Section J, Attachment

  11. Contract No. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    No. DE-AC27-10RV15051 Modification No. 118 SF-30 Continuation Page 2 of 3 14. Description of Amendment/Modification Continued: 1. Section B.1, Type of Contract - Items Being Acquired, is revised to increase the obligated funds for Contract Line Item (CLIN) 7 by $3,000,000.00, from $0.00 to $3,000,000.00. The total amount of funds obligated to the contract is increased from $64,465,917.21 to $67,465,917.21. The change is as follows: FROM: TOTAL FUNDS OBLIGATED CLIN Number Description Estimated

  12. Contract Number DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    08RV14800 Modification 382 ATTACHMENT Replacement Pages DE-AC27-08RV14800, MODIFICATION 382 Total: 111 pages including this cover page  Contract Section J, List of Attachments, page J-1  Contract Section J, Attachment J.3, Hanford Site Services and Interface Requirements Matrix, pages J.3-1 thru J.3-109 Tank Operations Contract Section J Contract No. DE-RP27-07RV14800 Modification No. 382 J-1 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J -- LIST OF ATTACHMENTS

  13. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OTHER ___________ (x) x DE-AC05-06OR23100 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already

  14. System and method for determining stator winding resistance in an AC motor

    DOE Patents [OSTI]

    Lu, Bin; Habetler, Thomas G.; Zhang, Pinjia; Theisen, Peter J.

    2011-05-31

    A system and method for determining stator winding resistance in an AC motor is disclosed. The system includes a circuit having an input connectable to an AC source and an output connectable to an input terminal of an AC motor. The circuit includes at least one contactor and at least one switch to control current flow and terminal voltages in the AC motor. The system also includes a controller connected to the circuit and configured to modify a switching time of the at least one switch to create a DC component in an output of the system corresponding to an input to the AC motor and determine a stator winding resistance of the AC motor based on the injected DC component of the voltage and current.

  15. Dielectric response of multiwalled carbon nanotubes as a function of applied ac-electric fields

    SciTech Connect (OSTI)

    Basu, Rajratan; Iannacchione, Germano S.

    2008-12-01

    The complex dielectric constant ({epsilon}{sup *}) is reported for multiwalled carbon nanotubes (MWCNTs) up to 10{sup 5} Hz as a function of ac-electric field amplitudes E{sub rot} (in phase and same frequency as the measurement) and E{sub ac} (different phase and fixed frequency with respect to the measurement). A slow relaxation process (mode 1) is observed, which shifts to higher frequency with increasing E{sub rot} but is independent of E{sub ac}. A fast relaxation process (mode 2) is also observed, which is independent of E{sub rot} but shifts to higher frequency with increasing E{sub ac} (opposite to that of mode 1). An ac-conductivity analysis of MWCNT reveals insights on how E{sub rot} and E{sub ac} influence the dissipation.

  16. Low-temperature transport in ac-driven quantum dots in the Kondo regime

    SciTech Connect (OSTI)

    Lopez, Rosa; Aguado, Ramon; Platero, Gloria; Tejedor, Carlos

    2001-08-15

    We present a fully nonequilibrium calculation of the low-temperature transport properties of a quantum dot in the Kondo regime when an ac potential is applied to the gate. We solve a time-dependent Anderson model with finite on-site Coulomb interaction. The interaction self-energy is calculated up to second order in perturbation theory in the on-site interaction, in the context of the Keldysh nonequilibrium technique, and the effect of the ac voltage is taken into account exactly for all ranges of ac frequencies and ac intensities. The obtained linear conductance and time-averaged density of states of the quantum dot evolve in a nontrivial way as a function of the ac frequency and ac intensity of the harmonic modulation.

  17. Mission Support Contract Section J Contract No. DE-AC06-09RL14728

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section J Contract No. DE-AC06-09RL14728 J-5-1 ATTACHMENT J-5 PERFORMANCE GUARANTEE AGREEMENT Modification 479 Mission Support Contract Section J Contract No. DE-AC06-09RL14728 J-5-2 Mission Support Contract Section J Contract No. DE-AC06-09RL14728 J-5-3 Mission Support Contract Section J Contract No. DE-AC06-09RL14728 J-5-4 Mission Support Contract Section J Contract No. DE-AC06-09RL14728 J-5-5 Section J Modification 479 Mission Support Contract Contract No. DE-AC06-09RL14728 Section J

  18. Programmable AC power supply for simulating power transient expected in fusion reactor

    SciTech Connect (OSTI)

    Halimi, B.; Suh, K. Y.

    2012-07-01

    This paper focus on control engineering of the programmable AC power source which has capability to simulate power transient expected in fusion reactor. To generate the programmable power source, AC-AC power electronics converter is adopted to control the power of a set of heaters to represent the transient phenomena of heat exchangers or heat sources of a fusion reactor. The International Thermonuclear Experimental Reactor (ITER) plasma operation scenario is used as the basic reference for producing this transient power source. (authors)

  19. Data Network Equipment Energy Use and Savings Potential in Buildings

    SciTech Connect (OSTI)

    Lanzisera, Steven; Nordman, Bruce; Brown, Richard E.

    2010-06-09

    Network connectivity has become nearly ubiquitous, and the energy use of the equipment required for this connectivity is growing. Network equipment consists of devices that primarily switch and route Internet Protocol (IP) packets from a source to a destination, and this category specifically excludes edge devices like PCs, servers and other sources and sinks of IP traffic. This paper presents the results of a study of network equipment energy use and includes case studies of networks in a campus, a medium commercial building, and a typical home. The total energy use of network equipment is the product of the stock of equipment in use, the power of each device, and their usage patterns. This information was gathered from market research reports, broadband market penetration studies, field metering, and interviews with network administrators and service providers. We estimate that network equipment in the USA used 18 TWh, or about 1percent of building electricity, in 2008 and that consumption is expected to grow at roughly 6percent per year to 23 TWh in 2012; world usage in 2008 was 51 TWh. This study shows that office building network switches and residential equipment are the two largest categories of energy use consuming 40percent and 30percent of the total respectively. We estimate potential energy savings for different scenarios using forecasts of equipment stock and energy use, and savings estimates range from 20percent to 50percent based on full market penetration of efficient technologies.

  20. Light duty utility arm equipment qualification test procedure

    SciTech Connect (OSTI)

    Kiebel, G.R., Westinghouse Hanford

    1996-07-22

    The Equipment Qualification Test described in this test procedure document is the acceptance test procedure (ATP) for the LDUA Baseline System. It verifies that the equipment is complete and in working order, and demonstrates its readiness for being deployed into an actual underground storage tank.

  1. Implementation plan for HANDI 2000 TWRS master equipment list

    SciTech Connect (OSTI)

    BENNION, S.I.

    1999-03-25

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.

  2. Bulk Hauling Equipment for CHG | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bulk Hauling Equipment for CHG Bulk Hauling Equipment for CHG This presentation by Don Baldwin of Hexagon Composites was given at the DOE Hydrogen Compression, Storage, and Dispensing Workshop in March 2013. csd_workshop_8_baldwin.pdf (1.2 MB) More Documents & Publications Tank Manufacturing, Testing, Deployment and Field Performance Hydrogen Delivery Roadmap US DRIVE Hydrogen Delivery Technical Team Roadmap

  3. Equipment specifications for an electrochemical fuel reprocessing plant

    SciTech Connect (OSTI)

    Hemphill, Kevin P

    2010-01-01

    Electrochemical reprocessing is a technique used to chemically separate and dissolve the components of spent nuclear fuel, in order to produce new metal fuel. There are several different variations to electrochemical reprocessing. These variations are accounted for by both the production of different types of spent nuclear fuel, as well as different states and organizations doing research in the field. For this electrochemical reprocessing plant, the spent fuel will be in the metallurgical form, a product of fast breeder reactors, which are used in many nuclear power plants. The equipment line for this process is divided into two main categories, the fuel refining equipment and the fuel fabrication equipment. The fuel refining equipment is responsible for separating out the plutonium and uranium together, while getting rid of the minor transuranic elements and fission products. The fuel fabrication equipment will then convert this plutonium and uranium mixture into readily usable metal fuel.

  4. Recommended nozzle loads for major equipment in fossil plants

    SciTech Connect (OSTI)

    Basavaraju, C.

    1995-12-31

    Most commonly, equipment nozzles are limiting items in the qualification of piping systems. Difficulty in meeting the allowable nozzle loads for major equipment such as boilers, HRSGs, steam turbines, pumps, tanks, heat exchangers, etc. is a commonly encountered and recurring problem. This issue also has a potential for impact on project costs and schedules due to modifications, piping reanalysis, and repeated interfaces with equipment vendor. The purpose of this paper is to provide guidance with regard to allowable nozzle loads. The approach consisted of utilizing data gathered and experience gained from several recently completed fossil fueled power projects. Tables containing a reasonable set of recommended values for allowable nozzle loads, which do not impose unnecessary burden either on the equipment manufacturers or on the designers and analysts of connected piping, are presented for guidance and use in the procurement of major equipment.

  5. The War of the Currents: AC vs. DC Power | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Power Company decided to award Westinghouse -- who had licensed Tesla's polyphase AC induction motor patent -- the contract to generate power from Niagara Falls. Although some...

  6. Machine protection system for rotating equipment and method

    DOE Patents [OSTI]

    Lakshminarasimha, Arkalgud N.; Rucigay, Richard J.; Ozgur, Dincer

    2003-01-01

    A machine protection system and method for rotating equipment introduces new alarming features and makes use of full proximity probe sensor information, including amplitude and phase. Baseline vibration amplitude and phase data is estimated and tracked according to operating modes of the rotating equipment. Baseline vibration and phase data can be determined using a rolling average and variance and stored in a unit circle or tracked using short term average and long term average baselines. The sensed vibration amplitude and phase is compared with the baseline vibration amplitude and phase data. Operation of the rotating equipment can be controlled based on the vibration amplitude and phase.

  7. Commercial Equipment Testing Enforcement Policies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commercial Equipment Testing Enforcement Policies Commercial Equipment Testing Enforcement Policies In an exercise of its enforcement discretion, under specific conditions, DOE will not perform assessment testing pursuant to 10 C.F.R. § 429.104, verification testing pursuant to 10 C.F.R. § 429.70(c)(5), or enforcement testing pursuant to 10 C.F.R. § 429.110 on certain units of commercial equipment, as described in these policy statements. Enforcement Policy Statement: Testing of Commercial

  8. Identify Petroleum Reduction Strategies for Vehicles and Mobile Equipment

    Broader source: Energy.gov [DOE]

    As defined by the Federal Energy Management Program (FEMP), greenhouse gas (GHG) emission reduction strategies for Federal vehicles and equipment are based on the three driving principles of petroleum reduction: Reduce vehicle miles traveled Improve fuel efficiency Use alternative fuels.

  9. Tax Credit for Renewable Energy Equipment Manufacturers | Department...

    Broader source: Energy.gov (indexed) [DOE]

    50% of eligible costs (10% per year for 5 years) Summary Note: The Tax Credit for Renewable Energy Resource Equipment Manufacturing Facilities has expired for new facilities. To be...

  10. General Restaurant Equipment: Proposed Penalty (2013-CE-5344)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that General Restaurant Equipment Co. failed to certify a variety of walk-in cooler or freezer components as compliant with the applicable energy conservation standards.

  11. Balance-of-System Equipment Required for Renewable Energy Systems...

    Broader source: Energy.gov (indexed) [DOE]

    Both grid-connected and off-grid home renewable energy systems require additional balance-of-system equipment. Both grid-connected and off-grid home renewable energy...

  12. Dispensing Equipment Testing With Mid-Level Ethanol/Gasoline...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dispensing Equipment Testing With Mid-Level EthanolGasoline Test Fluid Summary Report ... (E0-E85), Subject 87A, except using a CE17a test fluid based on the scope of this program. ...

  13. Choices related to chemical cleaning of fossil plant equipment

    SciTech Connect (OSTI)

    Shields, K.

    1995-01-01

    Choices faced by utility personnel responsible for cleanliness of steamside and waterside surfaces of fossil plant equipment are identified and discussed. Electric Power Research Institute (EPRI) guidelines for chemical cleaning are introduced. A chemical cleaning case history is presented.

  14. Focus Series: The Greater Cincinnati Energy Alliance (GCEA) Equipment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... How does the leasing arrangement work? McCracken: We wanted to make sure that contractors were committed to leasing equipment before we went ahead and purchased it. So after finding out ...

  15. Internal corrosion monitoring of subsea oil and gas production equipment

    SciTech Connect (OSTI)

    Joosten, M.W.; Fischer, K.P.; Lunden, K.C.

    1995-10-01

    Internal corrosion monitoring provides data vital to the operation of high-capital-cost, subsea equipment such as pipelines, flowlines, manifolds and water injection equipment. Monitoring can be used to determine the efficacy of corrosion/erosion mitigation techniques and allows operation of subsea equipment to maximize useful equipment life and minimize maintenance. For the operation of subsea systems that utilized corrosion inhibitors, there is a particular need to monitor the inhibitor performance. Methods for remote monitoring of corrosion are rapidly developing as the pace of subsea developments increase. Subsea completions set a record in 1993, exceeding the previous all-time high by 18% and exceeding 1992 installations by 73%. This paper will review experiences with offshore corrosion monitoring, the currently installed subsea corrosion monitoring systems, discuss the use of intelligent pigs as monitoring tools, and review some of the technologies that could possibly be utilized in the future such as ion selective electrodes, radioactive tracers and spectroscopy.

  16. Self-Tuning SPRT for Continuous Surveillance of Processes & Equipment

    Energy Science and Technology Software Center (OSTI)

    1996-12-18

    SABLE is an Al-based expert system for process and equipment operability surveillance in industrial applications that require high reliability, high sensitivity annunciation of degraded sensors, discrepant signals, or the incipience of system disturbances.

  17. Sales and Use Tax Exemption for Renewable Energy Equipment

    Broader source: Energy.gov [DOE]

    Two pieces of legislation expanding the sales tax exemption were enacted in May 2009. H.B. 1171 added residential wind energy equipment as eligible for this incentive. Residential wind energy...

  18. Electronic Equipment Donated to Elementary Schools on Hopi Reservation

    Broader source: Energy.gov [DOE]

    Title 41 Code of Federal Regulations Part 102-36, “Disposition of Excess Personal Property,” requires the federal government to reuse equipment and tools by donating excess personal property,...

  19. New Energy Efficiency Standards for Commercial Refrigeration Equipment to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cut Businesses' Energy Bills and Carbon Pollution | Department of Energy for Commercial Refrigeration Equipment to Cut Businesses' Energy Bills and Carbon Pollution New Energy Efficiency Standards for Commercial Refrigeration Equipment to Cut Businesses' Energy Bills and Carbon Pollution February 28, 2014 - 10:45am Addthis News Media Contact (202) 586-4940 WASHINGTON - Building on President Obama's State of the Union address and the Administration's Climate Action Plan, the Energy Department

  20. Purchasing Energy-Efficient Light Commercial Heating and Cooling Equipment

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial central air conditioners (CACs). This equipment falls under the light commercial heating and cooling equipment product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law.

  1. Feasibility of high recovery highwall mining equipment. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    Three equipment systems exhibited significant promise: the RSV Miner, a surface longwall using standard underground equipment, and the variable angle auger. Other equipment systems showing considerable merit were the surface shortwall, and the two extended depth augers. Of the three most significant systems, the RSV Miner exhibits the greatest versatility and adaptability. It may be used competently in many surface mining applications and readily adapts to geologic anomalies and changing seam heights. The machine employs steering and guidance equipment and provides the necessary capabilities for extended depth operation. Safety is good, as no men are required to work underground. However, most important is the system's recovery factor of approximately 75% to 80% of the in-situ coal reserve within reach. The surface longwall system using standard underground equipment (preferably a ranging drum shearer in conjunction with shield supports) is most suited to either a trench mining or a modified area mining application. Both applications would allow the length of the face to be held constant. Another important consideration is legal requirements for a tailgate entry, which would necessitate additional equipment for development in a modified area mining application. When compared to surface shortwall, surface longwall exhibits higher productivity, a far greater equipment selection which allows system tailoring to geologic conditions, and greater roof control due to the significantly smaller section of overburden that must be supported. Recovery should approach, and possibly exceed, 90% of the coal in-place. The variable angle auger, which is currently only a concept, fills a very real need for which no other equipment is available at this time.

  2. Minimization of Impact from Electric Vehicle Supply Equipment to the

    Office of Scientific and Technical Information (OSTI)

    Electric Grid Using a Dynamically Controlled Battery Bank for Peak Load Shaving (Conference) | SciTech Connect Minimization of Impact from Electric Vehicle Supply Equipment to the Electric Grid Using a Dynamically Controlled Battery Bank for Peak Load Shaving Citation Details In-Document Search Title: Minimization of Impact from Electric Vehicle Supply Equipment to the Electric Grid Using a Dynamically Controlled Battery Bank for Peak Load Shaving This research presents a comparison of two

  3. Accurate LPG analysis begins with sampling procedures, equipment

    SciTech Connect (OSTI)

    Wilkins, C.M. )

    1990-11-05

    Proper equipment and procedures are essential for obtaining representative samples from an LPG stream. This paper discusses how sampling of light liquid hydrocarbons generally involves one of two methods: flow- proportional composite sampling by a mechanical device or physical transfer of hydrocarbon fluids from a flowing pipeline or other source into a suitable portable sample container. If sampling by proper techniques and equipment supports careful chromatographic analysis, full advantage of accurate mass measurement of LPG can be realized.

  4. Interim Stabilization Equipment Essential and Support Drawing Plan

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-10-22

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings.

  5. Energy Efficient Computers, Home Office Equipment, and Electronics |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Electricity & Fuel » Appliances & Electronics » Energy Efficient Computers, Home Office Equipment, and Electronics Energy Efficient Computers, Home Office Equipment, and Electronics Use sleep mode and power management features on your computer to save money on your energy bill. Use sleep mode and power management features on your computer to save money on your energy bill. Many people work from home at least one day per week. Working from home saves energy and

  6. Microsoft Word - Equipment Use Policy Oct2710.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Equipment Use Policy revised 10/10 General Rules 1. An Operator is a trained/authorized user who is enabled access to specific equipment after receiving training and authorization for use. 2. Cleanroom staff provides: a. training and orientation to machines and capabilities b. technical assistance as needed upon request by the user c. service charged separately as an act of labor on a machine for another person, group or business. Specific machines have been designated for services purposes only

  7. Heating and Cooling System Support Equipment Basics | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Cooling System Support Equipment Basics Heating and Cooling System Support Equipment Basics July 30, 2013 - 3:28pm Addthis Thermostats and ducts provide opportunities for saving energy. Dehumidifying heat pipes provide a way to help central air conditioners and heat pumps dehumidify air. Electric and gas meters allow users to track energy use. Thermostats Programmable thermostats can store and repeat multiple daily settings. Users can adjust the times heating or air-conditioning is activated

  8. Jefferson Lab Tech Associate Invents Lockout Device for Equipment with

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Removable Power Cords | Jefferson Lab Tech Associate Invents Lockout Device for Equipment with Removable Power Cords Jefferson Lab Tech Associate Invents Lockout Device for Equipment with Removable Power Cords April 22, 2002 It was the early 1990s and building Jefferson Lab's Continuous Electron Beam Accelerator was in high gear. The Accelerator Division was busy installing some 30 vacuum ion pumps in the tunnel. Simultaneously, above ground in the long, low service buildings sitting over

  9. Equipment for nuclear medical centers, production capabilities of Rosatom enterprises

    SciTech Connect (OSTI)

    Gavrish, Yu. N.; Koloskov, S. A.; Smirnov, V. P.; Strokach, A. P.

    2015-12-15

    Analysis of the capabilities of the State Corporation Rosatom enterprises on the development and production of diagnostic and therapeutic equipment for nuclear medicine centers is presented. Prospects of the development of accelerator equipment for the production of a wide range of radioisotope products are shown, and the trends of its development are determined. A comparative analysis of the technical parameters of domestic tomographs and devices for brachytherapy with foreign counterparts is given.

  10. Design review report for modifications to RMCS safety class equipment

    SciTech Connect (OSTI)

    Corbett, J.E.

    1997-05-30

    This report documents the completion of the formal design review for modifications to the Rotary Mode Core Sampling (RMCS) safety class equipment. These modifications are intended to support core sampling operations in waste tanks requiring flammable gas controls. The objective of this review was to approve the Engineering Change Notices affecting safety class equipment used in the RMCS system. The conclusion reached by the review committee was that these changes are acceptable.

  11. Mining machinery/equipment/parts/services. Oil and Gas field equipment/machinery/parts/supplies (Argentina, Brazil, Colombia, Ecuador, Peru and Trinidad and Tobago)

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    This 7-part set includes separate reports on market possibilities for field production equipment, drilling equipment, refinery equipment, and auxiliary equipment in the following countries: Argentina, Brazil (2 reports), Colombia, Ecuador, Peru, and Trinidad and Tobago. Each report has been processed separately for inclusion on the data base.

  12. Tensiometer, drive probe for use with environmental testing equipment, and methods of inserting environmental testing equipment into a sample

    DOE Patents [OSTI]

    Hubbell, Joel M.; Sisson, James B.

    2005-07-26

    A method of inserting a tensiometer into a sample, comprises providing a drive probe configured to be engaged by direct push equipment; supporting a porous member from the drive probe; and driving the drive probe into the sample using a cone penetrometer. A tensiometer comprises a drive probe configured to be engaged by direct push equipment or a cone penetrometer; a porous member supported by the drive probe; and a pressure sensor in pressure sensing relation to the porous member.

  13. ATTACHMENT FLOODPLAIN STATEMENT OF FINDINGS FOR DEPARTMENT OF...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inverters convert the DC power to alternating current (AC) power, and the AC power then flows to transformers located in the solar field and at the project substation where it is ...

  14. Defect Prevention and Detection in Software for Automated Test Equipment

    SciTech Connect (OSTI)

    E. Bean

    2006-11-30

    Software for automated test equipment can be tedious and monotonous making it just as error-prone as other software. Active defect prevention and detection are also important for test applications. Incomplete or unclear requirements, a cryptic syntax used for some test applicationsespecially script-based test sets, variability in syntax or structure, and changing requirements are among the problems encountered in one tester. Such problems are common to all software but can be particularly problematic in test equipment software intended to test another product. Each of these issues increases the probability of error injection during test application development. This report describes a test application development tool designed to address these issues and others for a particular piece of test equipment. By addressing these problems in the development environment, the tool has powerful built-in defect prevention and detection capabilities. Regular expressions are widely used in the development tool as a means of formally defining test equipment requirements for the test application and verifying conformance to those requirements. A novel means of using regular expressions to perform range checking was developed. A reduction in rework and increased productivity are the results. These capabilities are described along with lessons learned and their applicability to other test equipment software. The test application development tool, or application builder, is known as the PT3800 AM Creation, Revision and Archiving Tool (PACRAT).

  15. NREL Engineers Look for a Cool Way to Make AC Units an Affordable Snap -

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Feature | NREL Engineers Look for a Cool Way to Make AC Units an Affordable Snap June 21, 2016 Two men shown on opposite sides of a wall installing the EcoSnap-AC Heat Pump System NREL engineers Chuck Booten and Jon Winkler installing the components of the EcoSnap-AC. Photo by Dennis Schroeder Engineers Chuck Booten and Jon Winkler experienced their first "Ah-ha!" moment together about three years ago as they were testing window air conditioners for an Energy Department

  16. Greener Commercial A/C Units Becoming a Cool Item | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Greener Commercial A/C Units Becoming a Cool Item Greener Commercial A/C Units Becoming a Cool Item July 1, 2010 - 5:11pm Addthis Greener Commercial A/C Units Becoming a Cool Item Stephen Graff Former Writer & editor for Energy Empowers, EERE A new federal tax credit is helping McQuay International expand its line of energy-efficient HVAC products at two of its plants and bring back furloughed workers. With the help of a 48C manufacturing tax credit worth $2 million under the American

  17. Fluctuation of an ion beam extracted from an AC filament driven Bernas-type ion source

    SciTech Connect (OSTI)

    Miyamoto, N. Okajima, Y.; Wada, M.

    2014-02-15

    Argon ion beam fluctuation from an AC filament driven Bernas-type ion source is observed. The ion beam was measured by an 8 measurement elements beam profile monitor. The amplitude of the beam current fluctuation stayed in the same level from 100 Hz to 1 kHz of the filament heating frequency. The beam current fluctuation frequency measured by the beam profile monitor was equal to the frequency of the AC filament operation. The fluctuation amplitudes of the beam current by AC operation were less than 7% and were in the same level of the DC operation.

  18. Segmented superconducting tape having reduced AC losses and method of making

    DOE Patents [OSTI]

    Foltyn, Stephen R.; Jia, Quanxi; Arendt, Paul N.; Holesinger, Terry G.; Wang, Haiyan

    2009-09-22

    A superconducting tape having reduced AC losses. The tape has a high temperature superconductor layer that is segmented. Disruptive strips, formed in one of the tape substrate, a buffer layer, and the superconducting layer create parallel discontinuities in the superconducting layer that separate the current-carrying elements of the superconducting layer into strips or filament-like structures. Segmentation of the current-carrying elements has the effect of reducing AC current losses. Methods of making such a superconducting tape and reducing AC losses in such tapes are also disclosed.

  19. Alternative Fuels Data Center: Equipment Options for E85 Fueling Systems

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Equipment Options for E85 Fueling Systems to someone by E-mail Share Alternative Fuels Data Center: Equipment Options for E85 Fueling Systems on Facebook Tweet about Alternative Fuels Data Center: Equipment Options for E85 Fueling Systems on Twitter Bookmark Alternative Fuels Data Center: Equipment Options for E85 Fueling Systems on Google Bookmark Alternative Fuels Data Center: Equipment Options for E85 Fueling Systems on Delicious Rank Alternative Fuels Data Center: Equipment Options for E85

  20. Magnetostrictive materials and method for improving AC characteristics in same

    DOE Patents [OSTI]

    Pulvirenti, Patricia P.; Jiles, David C.

    2001-08-14

    The present invention provides Terfenol-D alloys ("doped" Terfenol) having optimized performances under the condition of time-dependent magnetic fields. In one embodiment, performance is optimized by lowering the conductivity of Terfenol, thereby improving the frequency response. This can be achieved through addition of Group III or IV elements, such as Si and Al. Addition of these types of elements provides scattering sites for conduction electrons, thereby increasing resistivity by 125% which leads to an average increase in penetration depth of 80% at 1 kHz and an increase in energy conversion efficiency of 55%. The permeability of doped Terfenol remains constant over a wider frequency range as compared with undoped Terfenol. These results demonstrate that adding impurities, such as Si and Al, are effective in improving the ac characteristics of Terfenol. A magnetoelastic Gruneisen parameter, .gamma..sub.me, has also been derived from the thermodynamic equations of state, and provides another means by which to characterize the coupling efficiency in magnetostrictive materials on a more fundamental basis.