1

ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SCADA/EMS System INEEL Baseline Summary Test Report (November SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) This document covers the security evaluation of the "baseline" or "as delivered" system performed in the Idaho National Engineering and Environmental Laboratory (INEEL) SCADA test bed as part of the Critical Infrastructure Test Range Development Program, which is funded by the U.S. Department of Energy; Office of Energy Assurance (DOE/OEA). This report is a nonproprietary version of the report sent to ABB that identified specific issues related to the security vulnerabilities in the ABB SCADA/EMS system. Work was performed by specialists in the fields of control system development, networking, software engineering, and cybersecurity. This

2

Using CP in Automatic Test Generation for ABB Robotics’ Paint Control System  

Science Journals Connector (OSTI)

Designing industrial robot systems for welding, painting, and assembly, is challenging because they ... specialized in building highly reliable and safe robotized paint systems based on an integrated process cont...

Morten Mossige; Arnaud Gotlieb; Hein Meling

2014-01-01T23:59:59.000Z

3

Ventyx, an ABB Company  

Gasoline and Diesel Fuel Update (EIA)

Ventyx, an ABB Company Ventyx, an ABB Company 1495 Canyon Blvd Suite 100 Boulder, CO 80302 (t) 720.240.5500 www.ventyx.com April 30, 2013 Ms. Rebecca Peterson U.S Department of Energy, U.S. Energy Information Administration, Mail Stop EI-23, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 20585 Re: Proposed changes to Energy Information Administration Forms EIA-63B, EIA-411, EIA-826, EIA-860, EIA-860M, EIA-861, EIA-861S, and EIA-923. Federal Register Vol. 78 No. 44, Wednesday March 6, 2013. Dear Ms. Peterson: We appreciate the time and effort the Energy Information Administration spends collecting, maintaining and distributing industry wide data. The data found in EIA forms 923, 860, 860M, 861 and 826 is the industry standard and used by market analysts and

4

2012 SG Peer Review - Real-Time Distribution Feed Performance Monitoring, Advisory Control, and Health Management System - James Stoupis, ABB Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Real-Time Distribution Feeder Performance Real-Time Distribution Feeder Performance Monitoring, Advisory Control, and Health Management System James Stoupis ABB Inc., US Corporate Research Center June 7, 2012 December 2008 Real-Time Distribution Feeder Performance Monitoring Objective Life-cycle Funding Summary ($K) Prior to FY 12 FY12, authorized FY13, requested Out-year(s) $200 k $1.1 M $1.3 M $400k Technical Scope To innovatively leverage advanced sensing, monitoring, and control technologies to enhance asset utilization and grid reliability Install state-of-the-art data collection, monitoring, and sensing equipment in distribution substations and on distribution feeders Develop new feeder monitoring, advisory control, and asset health applications deployed on current circuits, and future circuits with DERs

5

Experimental Physicist ABB is a global leader in power and automation  

E-Print Network (OSTI)

that enable utility and industry customers to improve their performance while lowering environmental impact- dations for the next generation of ABB products. In Switzerland, ABB Corporate Research, located into the power grid, and scouting activities in solar energy tech- nologies. As a part of our research center

Daraio, Chiara

6

Environmental Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts...

7

Environmental Management System Plan  

E-Print Network (OSTI)

R-3 • Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

Fox, Robert

2009-01-01T23:59:59.000Z

8

Environmental Management System Plan  

E-Print Network (OSTI)

Water Discharges) of Introduction Environmental Managementmanagement Water conservation LBNL’s approach to sustainable environmentalEnvironmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: Protect the air, water,

Fox, Robert

2009-01-01T23:59:59.000Z

9

REQUEST BY ABB POWER GENERATION, INC., FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ABB POWER GENERATION, INC., FOR AN ABB POWER GENERATION, INC., FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN RIGHTS IN SUBJECT INVENTIONS MADE IN THE COURSE OF OR UNDER DEPARTMENT OF ENERGY CONTRACT NO. DE-AC21-95MC30245; DOE WAIVER DOCKET W(A)-95-035[ORO-604] ABB Power Generation, Inc., (ABB) has made a timely request for an advance waiver to worldwide rights in Subject Inventions made in the course of or under Department of Energy (DOE) Contract No. DE-AC21-95MC30245. The scope of the work calls for the completion of the conceptual preliminary design of a selected utility advanced turbine system (ATS), to identify technical barrier issues, and to conduct test programs of prospective conceptual designs that address these issues. The work is sponsored by the Office of Fossil Energy. The dollar amount of the contract is $4,807,507 with ABB cost sharing 25%, or

10

Environmental Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Management System Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous improvement of our environmental performance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Managing our effects on the environment We are committed to protecting the environment while conducting our national security and energy-related missions. Laboratory Environmental Governing Policy What is the Environmental Management System? It covers every program in the Laboratory

11

Workplace Charging Challenge Partner: ABB, Inc. | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

ABB is a global power and automation leader dedicated to energy efficiency solutions and smart grid technology. Fast Facts Joined the Workplace Charging Challenge: June 10, 2013...

12

ESS 2012 Peer Review - Superconducting Magnet ESS with Direct Power Electronics Interface - V.R. Ramanan, ABB  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

© ABB Group © ABB Group October 5, 2012 | Slide 1 Superconducting Magnet Energy Storage System with Direct Power Electronics Interface Project Goal  Competitive, fast response, grid-scale MWh superconducting magnet energy storage (SMES) system  Demonstrated through a small scale prototype, (20 kW, 2.5 MJ) and direct connection power electronics converter (with Si-based devices) V.R. Ramanan, ABB US Corporrate Research Center GRIDS SMES SYSTEM SMES Coil MV Feeder Power Converter ABB Brookhaven NL 2G HTS Wire SuperPower MV/LV MV/LV MV/LV HV/MV Wind Park Solar Park Transmission Line Converter & System Design/Prototyping LV Loads University of Houston ABB Project Update  Issues related to SMES system integration being addressed  Project slightly behind schedule; on budget

13

ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security Assessment at National SCADA Test Bed ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security Assessment at National SCADA Test Bed Twelve utilities have formed a consortium with ABB, a supervisory control and data acquisition (SCADA) system vendor, to privately fund advanced research and testing through the U.S. Department of Energy's (DOE) National SCADA Test Bed (NSTB), announced a recent article in the journal Transmission & Distribution World. ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security Assessment at National SCADA Test Bed More Documents & Publications Security is Not an Option ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004)

14

Six years of ABB-CE, petcoke and fluid beds  

SciTech Connect

Combustion Engineering, Inc. (ABB-CE) has constructed twenty circulating fluidized bed (CFB) boilers and 2 bubbling fluidized bed (BFB) boilers throughout North America. The units were designed to fire a wide range of fuels from anthracite culm to coals, lignites and biomasses. Based on fuels economics, some plants have decided to use petroleum coke as a replacement or supplemental fuel. The fluid bed boiler can inherently handle a wide range of fuel types without requiring modification or down-rating. ABB-CE units have a significant amount of petroleum coke operating experience firing 100% petroleum coke with no supplemental fuel ranging from the first commercial CFB unit at New Brunswick Power to the largest CFB unit at Texas New Mexico Power. Petroleum coke is also being co-fired with anthracite culm at the Scott Paper CFB. The world`s largest operating BFB, the 160 MWe unit at TVA`s Shawnee plant, has also been co-firing petroleum coke. The ability of the fluidized bed technology to fire low volatile fuels such as petroleum cokes, efficiently and in an environmentally acceptable manner will result in the use of this technology as a preferred means of power generation. This report gives a brief description of the petroleum coke firing experiences with ABB-CE fluid bed steam generators over the last six years.

Tanca, M.

1994-12-31T23:59:59.000Z

15

Environmental Compliance Management System  

SciTech Connect

Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy.

Brownson, L.W.; Krsul, T.; Peralta, R.A. [Argonne National Lab., Idaho Falls, ID (United States); Knudson, D.A.; Rosignolo, C.L. [Argonne National Lab., IL (United States)

1992-09-01T23:59:59.000Z

16

ABB Group April 16, 2009 | Slide 1  

E-Print Network (OSTI)

discharge overview Left-hand plot: Arc current Right-hand plot: Arc pressure and heating volume pressure -10© ABB Group April 16, 2009 | Slide 1 Physics of arc interruption in circuit breakers Nils P. Basse breaker? A circuit breaker is an automatically-operated electrical switch It is designed to protect

Basse, Nils Plesner

17

An environmental assessment system for environmental technologies  

Science Journals Connector (OSTI)

A new model for the environmental assessment of environmental technologies, EASETECH, has been developed. The primary aim of EASETECH is to perform life-cycle assessment (LCA) of complex systems handling heterogeneous material flows. The objectives of ... Keywords: EASETECH, Flow modelling, LCA model, Life cycle assessment, Uncertainty, Waste

Julie Clavreul, Hubert Baumeister, Thomas H. Christensen, Anders Damgaard

2014-10-01T23:59:59.000Z

18

Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"  

Energy.gov (U.S. Department of Energy (DOE))

ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

19

Environmental Management System Plan  

E-Print Network (OSTI)

management Water conservation LBNL’s approach to sustainable environmentalWater Discharges) of Introduction Environmental Managementenvironmental compliance programs, such as air and water quality, as well as less traditional programs, such as wildland fire management,

Fox, Robert

2009-01-01T23:59:59.000Z

20

Next Generation Environmentally Friendly Driving Feedback Systems...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Next Generation Environmentally Friendly Driving Feedback Systems Research and Development Next Generation Environmentally Friendly Driving Feedback Systems Research and...

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

STATEMENT OF CONSIDERATIONS REQUEST BY ABB AIR PREHEATER, INC. (ABB) FOR AN ADVANCE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 '94 9:56 FROM DOE-IPLD-CHICAGO 6 '94 9:56 FROM DOE-IPLD-CHICAGO PPGE .002 STATEMENT OF CONSIDERATIONS REQUEST BY ABB AIR PREHEATER, INC. (ABB) FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN INVENTION RIGHTS UNDER ITS SUBCONTRACT WITH NEW YORK STATE ELECTRIC & GAS CO., THE PARTICIPANT IN COOPERATIVE AGREEMENT NO. DE-FC22-92PC-92642; W(A)-93.024, CH-0783 New York State Electric & Gas Co. (NYSEG) was awarded the above-captioned cooper- ative agreement under the fourth round of the Innovative Clean Coal Technology Program pursuant to P.L. 101-512 to demonstrate a combination of cost effective emission reduction and efficiency improvement technologies which will allow utilities to comply with the Clean Air Act Amendments of 1990, at the Milliken Station in Lansing, New York. The cooperative agreement

22

PNNL: About - Environmental Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Policy. Pacific Northwest Division (PNWD) uses the International Organization for Standardization (ISO 14001) Environmental Management System (EMS) as a tool to manage, control,...

23

Environmental control system  

SciTech Connect

An environmental control system for controlling the environmental conditions in a swimming pool hall 1 comprises a heat pump having a multi-section evaporator 8, compressors 23a and 23b and a multi-section condensor 18. In the day-time, the dry bulb temperature in the pool hall is maintained by circulating space air through a duct 3 to the evaporator 8 where the latent heat is recovered from the moisture laden air. This heat is rejected via the condensor 18 either to the now drier recirculated air or fresh air from an inlet 13 or a mixture of air from the two sources. In a night mode of operation, circulation of space air through the duct 3 is prevented and instead it is recirculated via a direct recirculation duct 53 and is heated by the condensor 18, the heat used to do this being recovered from outside air inducted into the evaporator 8 via an inlet 50. In order to prevent frosting of the evaporator when the outside air temperature is too low, a damper 52 may be opened to allow some space air to pass through the evaporator 8 and raise its temperature. In order to increase the heat recovery capability of the compressor, storage tank 56 is used to collect waste water from showers etc. and also from backwash through the pool water filter and when this tank is full, its water is chilled by means of a water chiller 15 in parallel with the evaporator and the heat so recovered is rejected to the re-circulating space air by means of the condensor 18.

Foley, P. N.; Turbard, A. M.

1985-05-21T23:59:59.000Z

24

INL's Environmental Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

and minimize environmental impacts throughout the lifecycle of INL facilities and operations. Conduct all activities and manage hazardous and radioactive materials and...

25

Computerized Control of Environmental Systems  

E-Print Network (OSTI)

This paper examines the actual implementation of two computerized environmental system maintenance control centers. Project "A" is a candy manufacturing plant where controlled systems included subfreezing storage, HVAC, and cold storage (40F to 55F...

Gatti, F. L.

1980-01-01T23:59:59.000Z

26

Environmental Management System Steering Committee | The Ames...  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Management System Steering Committee The Environmental Management System Steering Committee (EMSSC) is a standing Ames Laboratory committee that advises the members...

27

Joint Environmental Management System (EMS) Declaration of Conformance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services Environmental Management System Joint Environmental Management System (EMS) Declaration of Conformance Joint Environmental Management System (EMS) Declaration of...

28

Environmental Management System `We are implementing an  

E-Print Network (OSTI)

Environmental Management System `We are implementing an Environmental Management System to address an Environmental Management System (EMS) which addresses all of the aspects of our business which have an impact Environmental Management System in all parts of our business. · Monitor and reduce our consumption of energy

29

ABB Corporate Research Center in Sweden is located in Vsters, about 100 kilometers west of Stockholm. Together with our colleagues in other R&D centers  

E-Print Network (OSTI)

operates in around 100 countries and well as updated of current best practices. employs about 145 to use, by investigating the state-of-the-art and best practices for the class of scheduling problems environmental impact. The well versed in the inner workings of the solver engines as ABB Group of companies

30

ABB builds on long-term Norsk hydro relationship  

Science Journals Connector (OSTI)

ABB has won a US$160 million order for maintenance and modification work on Norsk Hydro’s oil installations on the Norwegian continental shelf in the North Sea. This is a short news story only. Visit www.worldpumps.com for the latest pump industry news.

2003-01-01T23:59:59.000Z

31

ABB builds on long-term Norsk Hydro relationship  

Science Journals Connector (OSTI)

ABB has won a US$160 million order for maintenance and modification work on Norsk Hydro’s oil installations on the Norwegian continental shelf in the North Sea. This is a short news story only. Visit www.filtsep.com for the latest filtration industry news.

2003-01-01T23:59:59.000Z

32

Remote Environmental Monitoring System CRADA  

SciTech Connect

The goal of the project was to develop a wireless communications system, including communications, command, and control software, to remotely monitor the environmental state of a process or facility. Proof of performance would be tested and evaluated with a prototype demonstration in a functioning facility. AR Designs' participation provided access to software resources and products that enable network communications for real-time embedded systems to access remote workstation services such as Graphical User Interface (GUI), file I/O, Events, Video, Audio, etc. in a standardized manner. This industrial partner further provided knowledge and links with applications and current industry practices. FM and T's responsibility was primarily in hardware development in areas such as advanced sensors, wireless radios, communication interfaces, and monitoring and analysis of sensor data. This role included a capability to design, fabricate, and test prototypes and to provide a demonstration environment to test a proposed remote sensing system. A summary of technical accomplishments is given.

Hensley, R.D.

2000-03-30T23:59:59.000Z

33

Environmental Mitigation Technology (Innovative System Testing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology (Innovative System Testing)-Deployment and Testing of the Alden Hydropower Fish-Friendly Turbine Environmental Mitigation Technology (Innovative System...

34

CONFIRMATORY SURVEY RESULTS FOR PORTIONS OF THE ABB COMBUSTION ENGINEERING SITE IN WINDSOR, CONNECTICUT DURING THE FALL OF 2011  

SciTech Connect

From the mid-1950s until mid-2000, the Combustion Engineering, Inc. (CE) site in Windsor, Connecticut (Figure A-1) was involved in the research, development, engineering, production, and servicing of nuclear fuels, systems, and services. The site is currently undergoing decommissioning that will lead to license termination and unrestricted release in accordance with the requirements of the License Termination Rule in 10 CFR Part 20, Subpart E. Asea Brown Boveri Incorporated (ABB) has been decommissioning the CE site since 2001.

Wade C. Adams

2011-12-09T23:59:59.000Z

35

Bioinspired Environmental Coordination in Spatial Computing Systems  

E-Print Network (OSTI)

Bioinspired Environmental Coordination in Spatial Computing Systems Justin Werfel jkwerfel tissues. We suggest in closing a classification scheme for capabilities of environmental elements of environmental elements that we hope will aid the future study and design of such systems. This principle

Napp, Nils

36

Environmental Management Systems (Iowa) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management Systems (Iowa) Environmental Management Systems (Iowa) Environmental Management Systems (Iowa) < Back Eligibility Local Government Municipal/Public Utility Tribal Government Program Info State Iowa Program Type Environmental Regulations Fees Training/Technical Assistance Siting and Permitting Provider Iowa Department of Natural Resources A solid waste planning area (e.g., the land encompassed by a municipality with a comprehensive solid waste management policy) may qualify to be an Environmental Management System if it provides multiple environmental services in addition to solid waste disposal and plans for the continuous improvement of solid waste management by appropriately and aggressively mitigating the environmental impacts of solid waste disposal, including greenhouse gas emissions reduction measures. Environmental Management

37

E-Print Network 3.0 - abb robots form Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Engineering ; Computer Technologies and Information Sciences 2 Prof. Alessandro De Luca Robot Interaction Summary: deburring of windshields co ABB Excellence Center in Cecchina...

38

ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Energy Utilities Form Consortium to Fund SCADAEMS Cyber Security Assessment at National SCADA Test Bed ABB and Energy Utilities Form Consortium to Fund SCADAEMS Cyber...

39

EMS - Environmental Management System | Princeton Plasma Physics...  

NLE Websites -- All DOE Office Websites (Extended Search)

the rigorous requirements the globally recognized International Organization for Standardization (ISO) 14001:2004 Environmental Management System Standard. In 2011, an EMS...

40

Environmental remediation and waste management information systems  

SciTech Connect

The purpose of this paper is to document a few of the many environmental information systems that currently exist worldwide. The paper is not meant to be a comprehensive list; merely a discussion of a few of the more technical environmental database systems that are available. Regulatory databases such as US Environmental Protection Agency`s (EPA`s) RODS (Records of Decision System) database [EPA, 1993] and cost databases such as EPA`s CORA (Cost of Remedial Action) database [EPA, 1993] are not included in this paper. Section 2 describes several US Department of Energy (DOE) Environmental Restoration and Waste Management (EM) information systems and databases. Section 3 discusses several US EPA information systems on waste sites and technologies. Section 4 summarizes a few of the European Community environmental information systems, networks, and clearinghouses. And finally, Section 5 provides a brief overview of Geographical Information Systems. Section 6 contains the references, and the Appendices contain supporting information.

Harrington, M.W.; Harlan, C.P.

1993-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

IMPLEMENTING AN ISO 14001 ENVIRONMENTAL MANAGEMENT SYSTEM A Case Study of Environmental Training and Awareness at the Vancouver  

E-Print Network (OSTI)

IMPLEMENTING AN ISO 14001 ENVIRONMENTAL MANAGEMENT SYSTEM A Case Study of Environmental Training an ISO 14001 environmental management system: A case study of environmental training and awareness of limiting environmental damage. Environmental management systems (EMSs), such as ISO 14001, provide

42

2-1 2001 SITE ENVIRONMENTAL REPORT CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM  

E-Print Network (OSTI)

2-1 2001 SITE ENVIRONMENTAL REPORT CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM 2001 SITE ENVIRONMENTAL REPORT Environmental Management System B R O O K H A V E N N A T I O N A L L A B O R A T O R Y's Environmental Management System has an emphasis on compliance assurance, pollution prevention, and community

Homes, Christopher C.

43

2-1 1999 SITE ENVIRONMENTAL REPORT CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM  

E-Print Network (OSTI)

2-1 1999 SITE ENVIRONMENTAL REPORT CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM In 1999, Brookhaven National Laboratory continued to develop and implement an Environmental Management System to ensure that it operates in an environmentally responsible manner. The Laboratory's Environmental Management System

44

2-1 SITE ENVIRONMENTAL REPORT 2000 CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM  

E-Print Network (OSTI)

2-1 SITE ENVIRONMENTAL REPORT 2000 CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM SITE ENVIRONMENTAL REPORT 2000 Environmental Management System B R O O K H A V E N N A T I O N A L L A B O R A T O R Y Chapter 2 In 2000, BNL continued to implement and enhance its Environmental Management System to ensure

Homes, Christopher C.

45

LM Records Handling System (LMRHS01) - Rocky Flats Environmental...  

Office of Environmental Management (EM)

LM Records Handling System (LMRHS01) - Rocky Flats Environmental Records Database, Office of Legacy Management LM Records Handling System (LMRHS01) - Rocky Flats Environmental...

46

Joint Environmental Management System (EMS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) The environmental management system (EMS) has two areas of focus: environmental compliance and environmental sustainability. The environmental compliance aspect of the EMS consists of regulatory compliance and monitoring programs that implement federal, state, local, and tribal requirements; agreements; and permits under the Legacy Management contract. The environmental sustainability aspect promotes and integrates sustainability initiatives such as energy and natural resource conservation, waste minimization, green construction, and use of eco-friendly products and services into all phases of work. U.S. Department of Energy (DOE) Office of Legacy Management (LM) EMS was

47

CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM 1998 SITE ENVIRONMENTAL REPORT2-1  

E-Print Network (OSTI)

CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM 1998 SITE ENVIRONMENTAL REPORT2-1 2 Environmental an improved Environmental Management System (EMS) to ensure that it operates in an environmentally responsible of Energy 1998 Energy Management Achievement Award for water conservation efforts. Wa- ter conservation

48

Microsoft PowerPoint - [5] Le Tang - ABB Presentation at DOE HVDC Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVDC Technologies & ABB Experience HVDC Technologies & ABB Experience DOE Workshop - Applications for High-Voltage Direct Current Transmission Technologies Le Tang, ABB , April 22, 2013 In cable > 50 km (>30 miles), most of AC current is needed to charge and discharge In overhead lines > 200 km (>120 miles), most of AC voltage is needed to G G load I C = ωCU 0 U L = ωLI 0 I 0 U 0 I = I 0 - I C U=U 0 -U L Cable Overhead Line C load L Why is DC important in the Transmission Grid ? Capacitance and Inductance of Power Line © ABB Group April 22, 2013 | Slide 2 current is needed to charge and discharge the "C" (capacitance) of the cable most of AC voltage is needed to overcome the "L" (inductance) of the line ⇒ C& L can be compensated by reactors/capacitors or FACTS ⇒ or by use of DC, which means

49

Treatment methods for spent decontamination electrolyte produced in the ABB Atom electrochemical decontamination process ELDECON  

E-Print Network (OSTI)

One of ABB Atom's methods under development, ELDECON, is an electrochemical process for decontamination of components used in nuclear power plants. ELDECON removes radioactive species while producing small amounts of waste. However, the waste sludge...

Carlsson, Charlotta Elisabeth

2012-06-07T23:59:59.000Z

50

STATEMENT OF CONSIDERATIONS REQUEST BY ABB POWER T&D COMPANY...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Petitioner, ABB Power T&D Company, Inc., and on behalf of its alliance team members, Air Products and Chemicals, Inc. (APCI) and Edison Technology Solutions (ETS), has...

51

Abb Inc. medium-voltage products' supply chain analysis, including inventory, supplier scorecard, and risk assessments  

E-Print Network (OSTI)

In conformance with ABB's process excellence plan, this thesis study was undertaken to support improvements in on-time delivery of components, decreased order cycles, and reduced inventory levels for ADVAC (spring-mechan ...

Gaskins, Tamboura E. (Tamboura Elyse)

2006-01-01T23:59:59.000Z

52

Modular Turbine Control Software: A Control Software Architecture for the ABB Gas Turbine Family  

Science Journals Connector (OSTI)

ABB Power Generation’s family of gas turbines covers the power range of 35 to 270 MW with five basic turbine types, which vary in size, combustion technology and equipment. Each type comes in several variatons...

Dr. Christopher Ganz; Michael Layes

1998-01-01T23:59:59.000Z

53

Modeling simple trigeneration systems for the distribution of environmental loads  

Science Journals Connector (OSTI)

Integration of thermoeconomics and Life Cycle Analysis was carried out within the framework of an Environmental Management Information System. This combined approach identified where environmental loads were generated and tracked environmental loads ... Keywords: CO2, Environmental Management Information System, Environmental costs, Material flow networks, Trigeneration, Umberto software

Monica Carvalho; Miguel A. Lozano; Luis M. Serra; Volker Wohlgemuth

2012-04-01T23:59:59.000Z

54

Data:226d2d77-ac3f-4abb-843d-0161b7e36a62 | Open Energy Information  

Open Energy Info (EERE)

d2d77-ac3f-4abb-843d-0161b7e36a62 d2d77-ac3f-4abb-843d-0161b7e36a62 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2000/11/01 End date if known: Rate name: AREA LIGHTING 400 watt wide angle high pressure sodium Sector: Lighting Description: Available to all customers for dusk to dawn outdoor area lighting not served under street lighting contract. Service under this schedule is also available for television amplifiers for cable systems, and other flat rate services. Special Poles $1.00 per month Source or reference: http://www.tpud.org/servicesAndBilling/rateSchedules/rateSchedules_Light.aspx

55

Environmental applications of the particle analysis system  

SciTech Connect

This study demonstrates the applicability of particle counting technology for analysis of various water treatment systems at the Rocky Flats Plant. The Particle Analysis System described in this study determined the water quality of samples from environmental remediation, stormwater treatment, and drinking water treatment operations. Samples were measured in either discrete or on-line mode. This data showed filtration efficiencies, particle counts, particle size distributions, and real-time treatment system performance. Particle counting proved more sensitive than the turbidimetric measurement technique commonly used by the water treatment industry. Particle counting is a two-dimensional measurement of counts and sizes, whereas turbidity is a one-dimensional measurement of water clarity. Samples showing identical turbidities could be distinguished easily with the Particle Analysis System. The Particle Analysis System proved to be an efficient and reliable water quality measurement tool, and it is applicable to a variety of water treatment systems at the Rocky Flats Plant.

Moritz, E.J.; Hoffman, C.R.

1993-09-28T23:59:59.000Z

56

Operations Directorate Integrated Safety and Environmental Management Systems  

E-Print Network (OSTI)

Operations Directorate Integrated Safety and Environmental Management Systems (ISEMS) Plan Directorate Integrated Safety and Environmental Management System (ISEMS) Plan The Operations Directorate, Operations Date #12;The Operations Directorate ISEMS Plan 032108 bf 2 Annual Review and Update Operations

Wechsler, Risa H.

57

Data:4fb36aea-c051-4565-8491-36181abb11fc | Open Energy Information  

Open Energy Info (EERE)

aea-c051-4565-8491-36181abb11fc aea-c051-4565-8491-36181abb11fc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co Effective date: 2011/10/01 End date if known: Rate name: OUTDOOR LIGHTING - ENERGY ONLY DUSK TO DAWN METERED-EO Sector: Lighting Description: RULES AND REGULATIONS: Terms and conditions of this electric rate schedule and the General Rules and Regulations govern use of this service. APPLICATION OF SCHEDULE: This schedule is applicable to all Customers who choose to own, install, and maintain automatically operated dusk-to-dawn outdoor lighting equipment. Under this schedule, the Company will provide only the dusk to dawn electric Energy. EQUIPMENT AND SERVICE OWNERSHIP: The Customer or other third party shall install and own all equipment necessary for service beyond the point of connection with Company's electrical system. The point of connection shall be at the Meter or disconnect switch, for service provided either overhead or underground. The Customer will be responsible for furnishing and installing a master disconnect switch at the point of connection so as to isolate the Customer's equipment from Company's electrical system. The Customer's disconnect switch must be UL-approved or meet National Electric Code standards. The Customer is responsible for the cost of providing maintenance on the equipment it owns. The Company reserves the right to disconnect the Customer's equipment from the Company's electrical system should the Company determine the Customer's lighting equipment is operated or maintained in an unsafe or improper manner.

58

Integrated Safety, Environmental, & Emergency Management Systems (ISEEMS)  

SciTech Connect

Sandia`s Risk Management and NEPA Department recognized the need for hazard and environmental data analysis and management to support the line managers` need to know, understand, manage and document the hazards inherent in their facilities and activities. ISEEMS (Integrated Safety, Environmental, & Emergency Management System) was developed in response to this need. ISEEMS takes advantage of the fact that there is some information needed for the NEPA process that is also needed for the safety documentation process. The ISEEMS process enables Sandia to identify and manage hazards and environmental concerns at a level of effort commensurate with the hazards themselves by adopting a necessary and sufficient (graded) approach to compliance. The Preliminary Hazard Screening module of ISEEMS determines the facility or project activity hazard classification and facility designation. ISEEMS` geo-referenced icon allows immediate, visual integration of hazard information across geographic boundaries resulting in significant information compression. At Sandia, ISEEMS runs on the Sandia Internal Restricted Network, in an MS-Windows environment on standard PC hardware. The possibility of transporting ISEEMS to a ``WEB-like`` environment is being explored.

Silver, R.; Langwell, G.; Thomas, C.; Coffing, S.

1996-05-01T23:59:59.000Z

59

Exergy-Entropy Process of Global Environmental System  

Science Journals Connector (OSTI)

All of the built environmental spaces, in which we humans spend more than 90 % of the period of our life, are surrounded by the global environmental system. Therefore, we discuss here briefly how the global envir...

Masanori Shukuya

2013-01-01T23:59:59.000Z

60

Data:9944f743-0abb-4c16-9fb2-4fe2571bab84 | Open Energy Information  

Open Energy Info (EERE)

f743-0abb-4c16-9fb2-4fe2571bab84 f743-0abb-4c16-9fb2-4fe2571bab84 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Industrial Service (750 kW - 2499 kW) Primary Voltage Sector: Industrial Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. All kvar in excess of 40% (93% power factor) of billing demand will be billed at the rate of $0.90 per kvar. Primary voltage discount of $0.35 per kilowatt off of the demand charge. Source or reference: http://www.singingriver.com/Files/I-4.pdf

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

ENVIRONMENTAL MANAGEMENT SYSTEM OBJECTIVES AND TARGETS  

NLE Websites -- All DOE Office Websites (Extended Search)

Objectives & Targets Rev. 7/17/13 Objectives & Targets Rev. 7/17/13 ENVIRONMENTAL MANAGEMENT SYSTEM OBJECTIVES AND TARGETS 2012 PROGRESS REPORT for SOUTHWESTERN POWER ADMINISTRATION Activity Legal Requirement Aspect Objective Target** see important note Target Achieved Details Real Estate Management DOE O 436.1 E.O. 13423 & 13514 EPAct 1992 and 2005 EISA 2007 NECPA 1978 Natural resource depletion and GHG emissions from resource intensive facilities Increase sustainability of facility resources, reduce energy and water consumption, reduce impacts to natural resources from facility usage 1) Meter 90% of electricity by September 2012 2) Meter 90% of gas, steam, and water by September 2015 3) 30% energy intensity reduction by 2015 from baseline 2003 4) Reduce water consumption intensity 2%

62

Service-oriented design of environmental information systems.  

E-Print Network (OSTI)

??Service-orientation has an increasing impact upon the design process and the architecture of environmental information systems. This thesis specifies the SERVUS design methodology for geospatial… (more)

Usländer, Thomas

2010-01-01T23:59:59.000Z

63

Implementation Guide for Integrating Pollution Prevention into Environmental Management Systems  

Directives, Delegations, and Requirements

This Guide suggests approaches to integrating pollution prevention into Integrated Safety Management/Environmental Management Systems. Canceled by DOE N 251.82.

2005-05-27T23:59:59.000Z

64

Data:1524a36e-1c22-4219-81ab-b230eae8532a | Open Energy Information  

Open Energy Info (EERE)

a36e-1c22-4219-81ab-b230eae8532a a36e-1c22-4219-81ab-b230eae8532a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota Effective date: 2012/05/01 End date if known: Rate name: STREET LIGHTING SYSTEM SERVICE 100W High Pressure Sodium Overhead Sector: Lighting Description: Available for year-round illumination of public streets, parkways, and highways by High Pressure Sodium (HPS) or Metal Halide electric lamps in luminaires supported on poles, where the facilities for this service are furnished by Company. Underground Service under this schedule is limited to areas having a Company owned underground electric distribution system. Standard Service includes a monthly payment for the lighting system cost. Pre-Pay Option requires customer payment for the lighting system cost before establishing service.

65

EPA -- Amended Environmental Impact Statement Filing System Guidance |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA -- Amended Environmental Impact Statement Filing System EPA -- Amended Environmental Impact Statement Filing System Guidance EPA -- Amended Environmental Impact Statement Filing System Guidance Amended Environmental Impact Statement Filing System Guidance for Implementing 40 CFR 1506.9 and 1506.10 of the Council on Environmental Quality's Regulations Implementing the National Environmental Policy Act The purpose of the EPA Filing System Guidelines is to provide guidance to federal agencies on filing draft, final, and supplemental EISs. Information is provided on: (1) how to file an EIS; (2) the steps to follow when adopting an EIS, or when an EIS is withdrawn, delayed or reopened; (3) public review periods; (4) issuance of notices of availability in the Federal Register; and (5) retention of filed EISs. These updated guidelines

66

EPA -- Amended Environmental Impact Statement Filing System Guidance |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amended Environmental Impact Statement Filing System Amended Environmental Impact Statement Filing System Guidance EPA -- Amended Environmental Impact Statement Filing System Guidance Amended Environmental Impact Statement Filing System Guidance for Implementing 40 CFR 1506.9 and 1506.10 of the Council on Environmental Quality's Regulations Implementing the National Environmental Policy Act The purpose of the EPA Filing System Guidelines is to provide guidance to federal agencies on filing draft, final, and supplemental EISs. Information is provided on: (1) how to file an EIS; (2) the steps to follow when adopting an EIS, or when an EIS is withdrawn, delayed or reopened; (3) public review periods; (4) issuance of notices of availability in the Federal Register; and (5) retention of filed EISs. These updated guidelines

67

ABB Response to Smart Grid RFI. November 1, 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response to Smart Grid RFI. November 1, 2010 Response to Smart Grid RFI. November 1, 2010 ABB Response to Smart Grid RFI. November 1, 2010 Thank you for the opportunity to provide information to the Department of Energy Federal Register Doc. 2010-23251 filed September 16, 2010. With our recent acquisition of Ventyx, ABB is one of the few companies in the smart grid space that can approach the entire smart grid value chain, from distributed generation at the residential level to distribution automation and real-time conditioned based maintenance of asset health. Our response will draw on multiple areas of expertise, focusing on the technology side of our industry as well as market direction. Smart Grid RFI. November 1, 2010 More Documents & Publications Galvin Electricity Initiative DOE RFI DOE RFI 2010-23251: Addressing Policy

68

Sandia National Laboratories, California Environmental Management System program manual.  

SciTech Connect

The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

Larsen, Barbara L.

2013-04-01T23:59:59.000Z

69

Data:Ecc95e82-d30d-471e-b2ab-b3a465d824bd | Open Energy Information  

Open Energy Info (EERE)

Ecc95e82-d30d-471e-b2ab-b3a465d824bd Ecc95e82-d30d-471e-b2ab-b3a465d824bd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Foley Board of Utilities Effective date: 2012/03/01 End date if known: Rate name: Public Street and Highway Lighting- Utility-Owned Fixtures- 25,500 Lumen High Pressure Sodium Sector: Lighting Description: This rate is available to any municipality in which the Utility operates the local electric distribution system or to Baldwin County or to the State of Alabama for service along any highway adjacent to an electric distribution system of the Utility. Source or reference: http://www.rivierautilities.com/pdf/rates/rate_610_2012_03.pdf

70

Data:1ea9d25f-ccbc-47ab-b3b6-b41a73d54909 | Open Energy Information  

Open Energy Info (EERE)

d25f-ccbc-47ab-b3b6-b41a73d54909 d25f-ccbc-47ab-b3b6-b41a73d54909 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Foley Board of Utilities Effective date: 2012/03/01 End date if known: Rate name: Unmetered Ornamental Lighting- Acorn or Coach Lantern- 12000 Lumen Metal Halide with Octagonal Concrete Pole Sector: Lighting Description: This rate is available to any municipality in which the Utility operates the local electric distribution system or to Baldwin County or to the State of Alabama for service along any highway adjacent to an electric distribution system of the Utility. Source or reference: http://www.rivierautilities.com/pdf/rates/rate_610_2012_03.pdf

71

Environmental Systems Research Candidates FY-01 Annual Report  

SciTech Connect

The Environmental Systems Research Candidates (ESRC) Program ran from April 2000 through September 2001 as part of the Environmental Systems Research and Analysis (ESRA) Program at the Idaho National Engineering and Environmental Laboratory (INEEL). ESRA provides key science and technology to meet the cleanup mission of the U.S. Department of Energy Office of Environmental Management (EM), and performs research and development that will help solve current legacy problems and enhance the INEEL’s scientific and technical capability for solving longer-term challenges. This report documents the accomplishments of the ESRC Program. The ESRC Program consisted of 25 tasks subdivided within four research areas.

Miller, David Lynn; Piet, Steven James

2001-03-01T23:59:59.000Z

72

Data:557ed88b-9a43-4fac-abb2-6c8de9b501c3 | Open Energy Information  

Open Energy Info (EERE)

ed88b-9a43-4fac-abb2-6c8de9b501c3 ed88b-9a43-4fac-abb2-6c8de9b501c3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Plains Electric Coop Effective date: 2012/02/01 End date if known: Rate name: OUTDOOR LIGHTING SERVICE-175 W MV (Unmetered) Sector: Lighting Description: Availability Available for year-round illumination for private residential, business, or farm yard lighting on existing Cooperative service poles where service wires can be connected either on the source or load side of the consumer's meter, at discretion of the Cooperative. Service is subject to the established rules and regulations of the Cooperative. Type of Service The Cooperative shall own, operate, and maintain the security lighting system using the Cooperative's standard security lighting equipment.

73

Data:87074f52-f5b3-4087-91ab-b230a0ddc043 | Open Energy Information  

Open Energy Info (EERE)

f52-f5b3-4087-91ab-b230a0ddc043 f52-f5b3-4087-91ab-b230a0ddc043 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elroy, Wisconsin (Utility Company) Effective date: 2001/05/21 End date if known: Rate name: Pgs-2 Customer-Owned Generation Systems (Greater than 20kW) Sector: Description: Available for single-phase and three-phase where part or all of the electrical requirements of the customer are supplied by the customer's generating facilities, where such requirements of the customer are supplied by the customer's generating facilities have a total generating capacity of greater than 20kW and less than or equal to 100kW, where such facilities are connected in parallel with the utility. Customers not desiring to sell energy under this rate have the right to negotiate a buy-back rate.

74

Data:426ab71b-5e19-4f5d-abb5-2ef2e64e28cb | Open Energy Information  

Open Energy Info (EERE)

ab71b-5e19-4f5d-abb5-2ef2e64e28cb ab71b-5e19-4f5d-abb5-2ef2e64e28cb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeastern Rural E M C Effective date: 2012/02/27 End date if known: Rate name: RIDER 30-10 SMALL COMMERCIAL ENERGY STORAGE SERVICE (Single Phase) Sector: Commercial Description: This rider is available to customers of Northeastern REMC (Northeastern) who are eligible for andreceive service under Schedules 30-8 or 30-9 (Small Commercial Service - Single Phase and Three Phase respectively). This rider is for electric thermal storage (ETS) systems capable of storing energy during

75

MaxWest Environmental Systems | Open Energy Information  

Open Energy Info (EERE)

MaxWest Environmental Systems MaxWest Environmental Systems Jump to: navigation, search Name MaxWest Environmental Systems Place Houston, Texas Zip 77057 Product MaxWest Environmental Systems designs, builds, owns and operates gasification systems on a turnkey basis. Coordinates 29.76045°, -95.369784° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.76045,"lon":-95.369784,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

76

Products in environmental management systems: the role of auditors  

Science Journals Connector (OSTI)

For standardized environmental management systems (EMS) to be environmentally effective tools, they should affect important environmental aspects related to flows of materials and energy, which for manufacturing companies are closely connected to their products. This paper presents how external environmental auditors interpret and apply important product-related requirements of ISO 14001 at manufacturing companies in Sweden. The results indicate that the link between EMS and products is rather weak. Products are seldom regarded as significant environmental aspects and are therefore not within the main scope of many EMS, which are mainly focused on sites. However, all of the interviewed auditors require that some kind of environmental considerations be incorporated into product development, but these considerations are to large extent site oriented; how they are prioritized in relation to other factors such as economics and other customer priorities appears to be up to the companies. The paper includes some recommendations to strengthen the role of products within the framework of standardized EMS.

Jonas Ammenberg; Erik Sundin

2005-01-01T23:59:59.000Z

77

Model for Energy Supply System Alternatives and their General Environmental  

Open Energy Info (EERE)

Model for Energy Supply System Alternatives and their General Environmental Model for Energy Supply System Alternatives and their General Environmental Impacts (MESSAGE) (Redirected from Model for Energy Supply System Alternatives and their General Environmental Impacts) Jump to: navigation, search Tool Summary Name: Model for Energy Supply System Alternatives and their General Environmental Impacts Agency/Company /Organization: International Atomic Energy Agency Sector: Energy Focus Area: Renewable Energy, Energy Efficiency Topics: Pathways analysis Resource Type: Software/modeling tools Website: www-tc.iaea.org/tcweb/abouttc/strategy/Thematic/pdf/presentations/ener References: Overview of IAEA PESS Models [1] "MESSAGE combines technologies and fuels to construct so-called "energy chains", making it possible to map energy flows from supply (resource

78

STATEMENT OF CONSIDERATIONS REQUEST BY ABB POWER T&D COMPANY INC., (T&D) FOR AN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ABB POWER T&D COMPANY INC., (T&D) FOR AN ABB POWER T&D COMPANY INC., (T&D) FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN PATENT RIGHTS UNDER DOE COOPERATIVE AGREEMENT NO. DE-FC36-98GO10284; W(A)-98-016; CH-0982 The Petitioner, ABB Power T&D Company, Inc., and on behalf of its alliance team members, Air Products and Chemicals, Inc. (APCI) and Edison Technology Solutions (ETS), has requested a waiver of domestic and foreign patent rights for all subject inventions arising under the above referenced cooperative agreement. The cooperative agreement is entitled, "Development and Demonstration of a 10MVA High Temperature Superconducting Transformer." The objective of this cooperative agreement is to design, build, test, install, and monitor the performance of a prototype 10 MVA high temperature superconducting transformer (HTST). The

79

ABB leader nelle tecnologie per l'energia e l'automazione che consentono alle utility e alle industrie di migliorare le loro performance riducendo al contempo  

E-Print Network (OSTI)

, controllori a logica programmabile (PLC), elettronica di potenza e robotica che forniscono energia, movimento ABB che metterà a disposizione il know-how di robotica. Il/la candidato/a ideale è un/a laurendo'indirizzo sara.blasi@it.abb.com citando il riferimento Robotica - SSG. #12;

Segatti, Antonio

80

Draft Environmental Impact Statement for a Container System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Navy (Lead Agency) the Navy (Lead Agency) Naval Nuclear Propulsion Program Department of Energy (Cooperating Agency) - DOE/EIS-0251 Prepared in accordance with: National Environmental Policy Act Section 102 (2) (C) FINAL ENVIRONMENTAL IMPACT STATEMENT FOR A CONTAINER SYSTEM FOR THE MANAGEMENT OF NAVAL SPENT NUCLEAR FUEL Contact: William Knoll Department of the Navy Code NAVSEA 08U 2531 Jefferson Davis Highway Arlington, VA 22242-5160 Telephone Number: 703-602-8229 Abstract: This Final Environmental Impact Statement (EIS) addresses six general alternative systems for the loading, storage, transport, and possible disposal of naval spent nuclear fuel following examination. It supersedes the Draft Environmental Impact Statement for a Container System for the Management of Naval Spent Nuclear Fuel dated May 1996.

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Ceramic Systems - Environmental Design to Robotic Production Workflow  

NLE Websites -- All DOE Office Websites (Extended Search)

Ceramic Systems - Environmental Design to Robotic Production Workflow Ceramic Systems - Environmental Design to Robotic Production Workflow Speaker(s): Martin Bechthold Date: February 1, 2013 - 1:00pm Location: 90-4133 Seminar Host/Point of Contact: Dane Lay The current design practice for high performance, custom facade systems easily disconnects the initial façade design from the fabrication phase. The early design phases typically involve a series of iterative tests during which the environmental performance of different design variants is verified through simulations or physical measurements. After completing the environmental design, construction and fabrication constraints are incorporated. Time, budget constraints, and workflow incompatibilities are common obstacles that prevent design teams from verifying, through

82

Quelle der nchsten 3 Abb.: J. LOPEZ (USA) IWM4, Tainan (2007) Environmental Protection  

E-Print Network (OSTI)

of incineration plants Masuda, Japan 1987 some results: DNXs: clorinated dioxins and related compounds e.g.: polychlorinated dibenzo-p-dioxins (furans, ...) TEQ: Toxic Equivalent =1-TEFx concentrations of DNXs TEF: Toxic

Greifswald, Ernst-Moritz-Arndt-Universität

83

STATEMENT OF CONSIDERATIONS REQUEST BY ABB LUMMUS GLOBAL, INC. FOR AN ADVANCE WAIVER OF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 2005 16:50 FR IPL DOE CH 630 252 2779 TO AGCP-HQ P.02/03 6 2005 16:50 FR IPL DOE CH 630 252 2779 TO AGCP-HQ P.02/03 * * STATEMENT OF CONSIDERATIONS REQUEST BY ABB LUMMUS GLOBAL, INC. FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN PATENT RIGHTS UNDER A SUBCONTRACT WITH MEMBRANE TECHNOLOGY AND RESEARCH, INC. UNDER DOE COOPERATIVE AGREEMENT NO. DE-FC36-04GO14151 ENTITLED "SEPARATION OF OLEFIN/PARAFFIN MIXTURES WITH CARRIER FACILITATED MEMBRANES" W(A)-05-010; CH-1274 As set out in the attached waiver petition, ABB Lummus Global. Inc. (LGI) has requested an advance waiver of domestic and foreign patent rights for all subject inventions made under the above-identified subcontract by its employees. Referring to item 2 in LGI's waiver petition, this agreement is part of DOE's Chemical Industries of the Future program. Under the agreement LGI has partnered with Membrane

84

Environmental Management Systems | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Systems The U.S. Department of Energy (DOE) is committed to implement sustainability into all aspects of operations. Executive Order (EO) 13423, Strengthening Federal...

85

Environmental Management Systems | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Systems The Department of Energy (DOE) is committed to implement sustainability into all aspects of operations. Executive Order (EO) 13423, Strengthening Federal...

86

Integrated Safety & Environmental Management System | Stanford Synchrotron  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Safety & Environmental Management System Integrated Safety & Environmental Management System How do you plan for SAFETY in your job? In an effort to provide a formal and organized process to manage all aspects of Environment, Safety and Health (ES&H) issues at its laboratories, the DOE developed the Integrated Safety and Environmental Management System (ISEMS). In short, it's a process that allows people (such as staff and Users) at all levels to plan, perform, assess and improve their implementation of ES&H at work. The system puts the responsibility for safety on each person. Fundamental to the process are the Guiding Principles that can be viewed as "best management practices" or "how we do business", which are the policies that integrate ISMS at all levels; the Core Functions, which provide the

87

Environmental status of a tropical lake system  

Science Journals Connector (OSTI)

Eutrophication has become a serious threat to the lake systems all over the world. This is mainly due to the pollution caused by anthropogenic activities. Carlson trophic state index (CTSI) is commonly used fo...

A. M. Sheela; J. Letha; Sabu Joseph

2011-09-01T23:59:59.000Z

88

Model for Energy Supply System Alternatives and their General Environmental  

Open Energy Info (EERE)

Model for Energy Supply System Alternatives and their General Environmental Model for Energy Supply System Alternatives and their General Environmental Impacts (MESSAGE) Jump to: navigation, search Tool Summary Name: Model for Energy Supply System Alternatives and their General Environmental Impacts Agency/Company /Organization: International Atomic Energy Agency Sector: Energy Focus Area: Renewable Energy, Energy Efficiency Topics: Pathways analysis Resource Type: Software/modeling tools Website: www-tc.iaea.org/tcweb/abouttc/strategy/Thematic/pdf/presentations/ener References: Overview of IAEA PESS Models [1] "MESSAGE combines technologies and fuels to construct so-called "energy chains", making it possible to map energy flows from supply (resource extraction) to demand (energy services). The model can help design long

89

Environmental Management System 2 2010 SITE ENVIRONMENTAL REPORT2-1  

E-Print Network (OSTI)

. The process- based structure of the ISO 14001 and OHSAS 18001 Standards are based on the "Plan-Do- Check, implement the plans, check progress and take corrective actions, and review the system periodically for Standardization (ISO) 14001 Environmental Management Standard, with additional emphasis on compliance, pollution

90

Method and system for monitoring environmental conditions  

DOE Patents (OSTI)

A system for detecting the occurrence of anomalies includes a plurality of spaced apart nodes, with each node having adjacent nodes, each of the nodes having one or more sensors associated with the node and capable of detecting anomalies, and each of the nodes having a controller connected to the sensors associated with the node. The system also includes communication links between adjacent nodes, whereby the nodes form a network. At least one software agent is capable of changing the operation of at least one of the controllers in response to the detection of an anomaly by a sensor.

Kulesz, James J. (Oak Ridge, TN) [Oak Ridge, TN; Lee, Ronald W. (Oak Ridge, TN) [Oak Ridge, TN

2010-11-16T23:59:59.000Z

91

Energy, Environmental, and Economic Systems Analysis  

E-Print Network (OSTI)

and deregulated, shifting control from a single decision maker (i.e., a single, government-owned electric utility in the electricity market are represented as "agents." All agents can have their own set of objectives, decision maker with a single objective for the entire system. Rather, agents follow their own objectives

92

Energy and Environmental Systems Division 1981 research review  

SciTech Connect

To effectively manage the nation's energy and natural resources, government and industry leaders need accurate information regarding the performance and economics of advanced energy systems and the costs and benefits of public-sector initiatives. The Energy and Environmental Systems Division (EES) of Argonne National Laboratory conducts applied research and development programs that provide such information through systems analysis, geophysical field research, and engineering studies. During 1981, the division: analyzed the production economics of specific energy resources, such as biomass and tight sands gas; developed and transferred to industry economically efficient techniques for addressing energy-related resource management and environmental protection problems, such as the reclamation of strip-mined land; determined the engineering performance and cost of advanced energy-supply and pollution-control systems; analyzed future markets for district heating systems and other emerging energy technologies; determined, in strategic planning studies, the availability of resources needed for new energy technologies, such as the imported metals used in advanced electric-vehicle batteries; evaluated the effectiveness of strategies for reducing scarce-fuel consumption in the transportation sector; identified the costs and benefits of measures designed to stabilize the financial condition of US electric utilities; estimated the costs of nuclear reactor shutdowns and evaluated geologic conditions at potential sites for permanent underground storage of nuclear waste; evaluated the cost-effectiveness of environmental regulations, particularly those affecting coal combustion; and identified the environmental effects of energy technologies and transportation systems.

Not Available

1982-04-01T23:59:59.000Z

93

Environmental Solar Systems | Open Energy Information  

Open Energy Info (EERE)

Solar Systems Solar Systems Address 117 West Street Place Methuen, Massachusetts Zip 01844 Sector Solar Product Solar thermal panels for home heating Website http://www.environmentalsolars Coordinates 42.7221279°, -71.2468847° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.7221279,"lon":-71.2468847,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

94

Power Systems Development Facility. Environmental Assessment  

SciTech Connect

The objective of the PSDF would be to provide a modular facility which would support the development of advanced, pilot-scale, coal-based power systems and hot gas clean-up components. These pilot-scale components would be designed to be large enough so that the results can be related and projected to commercial systems. The facility would use a modular approach to enhance the flexibility and capability for testing; consequently, overall capital and operating costs when compared with stand-alone facilities would be reduced by sharing resources common to different modules. The facility would identify and resolve technical barrier, as well as-provide a structure for long-term testing and performance assessment. It is also intended that the facility would evaluate the operational and performance characteristics of the advanced power systems with both bituminous and subbituminous coals. Five technology-based experimental modules are proposed for the PSDF: (1) an advanced gasifier module, (2) a fuel cell test module, (3) a PFBC module, (4) a combustion gas turbine module, and (5) a module comprised of five hot gas cleanup particulate control devices. The final module, the PCD, would capture coal-derived ash and particles from both the PFBC and advanced gasifier gas streams to provide for overall particulate emission control, as well as to protect the combustion turbine and the fuel cell.

Not Available

1993-06-01T23:59:59.000Z

95

Environmental Assessment of Photovoltaic Systems and Effectiveness Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessment of Photovoltaic Systems and Effectiveness Analysis Environmental Assessment of Photovoltaic Systems and Effectiveness Analysis of U.S. Renewable Energy Policies Speaker(s): Pei Zhai Date: October 25, 2010 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Chris Marnay This presentation mainly covers two perspectives relevant to solar energy technologies. The first one is the environmental aspect. The questions to be answered are how "green" photovoltaic technology is (embodied energy and carbon are two main indicators); and, how have these two indicators evolved during the past 10 years. The methodology for analysis is a hybrid Life Cycle Assessment. The second part involves a policy analysis of the effectiveness of U.S. renewable energy policies, such as state-level Renewable Portfolio Standards, for supporting solar energy adoption. A

96

Sandia National Laboratories, California Environmental Management System Program Manual.  

SciTech Connect

The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

Not Available

2009-04-01T23:59:59.000Z

97

Implementation Guide for Integrating Environmental Management Systems into Integrated Safety Management Systems  

Directives, Delegations, and Requirements

This Guide provides guidance to assist DOE sites in identifying those missing environmental management systems elements and integrating them into the site's integrated safety management system. Canceled by DOE N 251.96.

2004-08-20T23:59:59.000Z

98

Energy and Environmental Systems Division's publications publications 1968-1982  

SciTech Connect

Books, journal articles, conference papers, and technical reports produced by the Energy and Environmental Systems Division of Argonne National Laboratory are listed in this bibliography. Subjects covered are energy resources (recovery and use); energy-efficient technology; electric utilities, and environments. (MCW)

none,

1982-03-01T23:59:59.000Z

99

Environmental Noise and Nonlinear Relaxation in Biological Systems  

E-Print Network (OSTI)

We analyse the effects of environmental noise in three different biological systems: (i) mating behaviour of individuals of \\emph{Nezara viridula} (L.) (Heteroptera Pentatomidae); (ii) polymer translocation in crowded solution; (iii) an ecosystem described by a Verhulst model with a multiplicative L\\'{e}vy noise.

B. Spagnolo; D. Valenti; S. Spezia; L. Curcio; N. Pizzolato; A. A. Dubkov; A. Fiasconaro; D. Persano Adorno; P. Lo Bue; E. Peri; S. Colazza

2011-10-18T23:59:59.000Z

100

CLASSIFICATION OF THE MGR SURFACE ENVIRONMENTAL MONITORING SYSTEM  

SciTech Connect

The purpose of this analysis is to document the Quality Assurance (QA) classification of the Monitored Geologic Repository (MGR) surface environmental monitoring system structures, systems and components (SSCs) performed by the MGR Safety Assurance Department. This analysis also provides the basis for revision of YMP/90-55Q, Q-List (YMP 1998). The Q-List identifies those MGR SSCs subject to the requirements of DOE/RW-0333PY ''Quality Assurance Requirements and Description'' (QARD) (DOE 1998).

J.A. Ziegler

1999-08-31T23:59:59.000Z

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Sandia National Laboratories, California Environmental Management System Program Manual.  

SciTech Connect

The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

Larsen, Barbara L.

2011-04-01T23:59:59.000Z

102

Environmental inventories for future electricity supply systems for Switzerland  

Science Journals Connector (OSTI)

The Swiss Association of Producers and Distributors of Electricity (VSE) identified a number of possible supply mix options to meet the future electricity demand in Switzerland. In this context, PSI, in co-operation with ETHZ, analysed environmental inventories for the selected electricity supply systems. Life Cycle Analysis (LCA) was used to establish the inventories, covering the complete energy chains associated with fossil, nuclear and renewable systems. The assessment was performed on three levels: (1) individually for each system considered; (2) comparison of systems; (3) comparison of supply mix options. In absolute value, the emissions of the major pollutants considered are, in most cases, significantly reduced in comparison with the currently operating systems. Due to the considerable advancements in fossil power plant technologies, the relative importance of other activities increases in the fossil energy systems. Selected results for systems and supply options are given in the present paper.

R. Dones; U.; Ganter; S. Hirschberg

1999-01-01T23:59:59.000Z

103

Data:1373f291-f0ee-45f7-8abb-710bcedb969b | Open Energy Information  

Open Energy Info (EERE)

f0ee-45f7-8abb-710bcedb969b f0ee-45f7-8abb-710bcedb969b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ocmulgee Electric Member Corp Effective date: 1999/05/01 End date if known: Rate name: 250W Type -'HPS-Flood', kWh-100 Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Corporation's specifications. Service will be rendered only at locations that, solely in the opinion of the Corporation, are readily accessible for installation and maintenance. Source or reference: ISU Documentation

104

Data:681a20e7-1609-4716-ab09-9519abb17060 | Open Energy Information  

Open Energy Info (EERE)

e7-1609-4716-ab09-9519abb17060 e7-1609-4716-ab09-9519abb17060 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Edmond, Oklahoma (Utility Company) Effective date: 2009/09/30 End date if known: Rate name: PM-1 Municipal Water Pumping Sector: Commercial Description: Source or reference: http://edmondok.com/DocumentCenter/Home/View/442 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

105

Data:74883c08-aa2f-47ab-b972-528067752eab | Open Energy Information  

Open Energy Info (EERE)

aa2f-47ab-b972-528067752eab aa2f-47ab-b972-528067752eab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New London Electric&Water Util Effective date: 2009/07/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0699 per kilowatt-hour.

106

Data:Abb64835-dbab-4f60-9977-ec9fe654c0df | Open Energy Information  

Open Energy Info (EERE)

Abb64835-dbab-4f60-9977-ec9fe654c0df Abb64835-dbab-4f60-9977-ec9fe654c0df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: Area Lighting - HPS-L 100W Sector: Lighting Description: Public Purposes Rider = base rate x %2.85. Source or reference: http://www.avistautilities.com/services/energypricing/wa/elect/Pages/default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

107

Data:49adcdaa-ad87-4a41-bbc6-c784aeaf6abb | Open Energy Information  

Open Energy Info (EERE)

adcdaa-ad87-4a41-bbc6-c784aeaf6abb adcdaa-ad87-4a41-bbc6-c784aeaf6abb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Boscobel, Wisconsin (Utility Company) Effective date: 2010/06/01 End date if known: Rate name: General Service Single Phase Sector: Industrial Description: POWER COST ADJUSTMENT CLAUSE (PCAC) All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost power is greater or lesser than the base cost of power purchased or produced. The base cost until changed by the Public Service Commission is $0.0747 per KWH.

108

Data:603f3abb-4342-429c-978c-0670c88794af | Open Energy Information  

Open Energy Info (EERE)

3f3abb-4342-429c-978c-0670c88794af 3f3abb-4342-429c-978c-0670c88794af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bangor, Wisconsin (Utility Company) Effective date: 2010/05/19 End date if known: Rate name: Gs-1 General Service Three Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 50 kilowatts for three or more months in a consecutive 12-month period.

109

Data:19abb7b4-fbe6-4198-8865-f58fe17813d5 | Open Energy Information  

Open Energy Info (EERE)

abb7b4-fbe6-4198-8865-f58fe17813d5 abb7b4-fbe6-4198-8865-f58fe17813d5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Carroll Electric Member Corp Effective date: 2012/02/01 End date if known: Rate name: Outdoor Lighting Overhead Wiring No Existing Wood Pole MV 1000 W Sector: Lighting Description: *IDC Rider Charges included in Fixed Monthly Charge $180 one time charge for instillation Source or reference: http://www.cemc.com/Files/OL-2%20Outdoor%20Lighting%20final%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

110

"CONFIRMATORY SURVEY RESULTS FOR THE ABB COMBUSTION ENGINEERING SITE WINDSOR, CONNECTICUT DCN 5158-SR-02-2  

SciTech Connect

The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor?s procedures and FSS results. ORAU reviewed ABB CE?s decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys include gamma surface scans, gamma direct measurements, and soil sampling.

ADAMS, WADE C

2013-03-25T23:59:59.000Z

111

A structural neural system for mechanical, biological, and environmental systems  

Science Journals Connector (OSTI)

A structural neural system (SNS) and continuous sensors that mimic the neurons of the human biological system are described for monitoring the health of large structures. An example of use of the SNS to monitor damage on a nine meter long wind turbine ...

Goutham R. Kirikera; Mark J. Schulz; Yun Yeo-Heung; Vesselin Shanov

2008-03-01T23:59:59.000Z

112

Environmental Systems Research and Analysis FY 2000 Annual Report  

SciTech Connect

The Environmental Systems Research (ESR) Program, a part of the Environmental Systems Research and Analysis (ESRA) Program, was implemented to enhance and augment the technical capabilities of the INEEL. Strengthening the Technical capabilities of the INEEL will provide the technical base to serve effectively as the Environmental Management Laboratory for the Office of Environmental Management (EM). This is a progress report for the third year of the ESR Program (FY 2000). A report of activities is presented for the five ESR research investment areas: (1) Transport Aspects of Selective Mass Transport Agents, (2) Chemistry of Environmental Surfaces, (3) Materials Dynamics, (4) Characterization Science, and (5) Computational Simulation of Mechanical and Chemical Systems. In addition to the five technical areas, the report describes activities in the Science and Technology Foundations element of the program, e.g., interfaces between ESR and the EM Science Program (EMSP) and the EM Focus Areas. The five research areas are subdivided into 18 research projects. FY 2000 research in these 18 projects has resulted in more than 50 technical papers that are in print, in press, in review, or in preparation. Additionally, more than 100 presentations were made at professional society meetings nationally and internationally. Work supported by this program was in part responsible for one of our researchers, Dr. Mason Harrup, receiving the Department of Energy’s “Bright Light” and “Energy at 23” awards. Significant accomplishments were achieved. Non-Destructive Assay hardware and software was deployed at the INEEL, enhancing the quality and efficiency of TRU waste characterization for shipment. The advanced tensiometer has been employed at numerous sites around the complex to determine hydrologic gradients in variably saturated vadose zones. An ion trap, secondary ion mass spectrometer (IT-SIMS) was designed and fabricated to deploy at the INEEL site to measure the chemical speciation of radionuclides and toxic metals on the surfaces of environmentally significant minerals. The FY 2001 program will have a significantly different structure and research content. This report presents the final summary of projects coming to an end in FY 2000 and is a bridge to the FY 2001 program.

David L. Miller; Castle, Peter Myer; Steven J. Piet

2001-01-01T23:59:59.000Z

113

Conceptual Model of Offshore Wind Environmental Risk Evaluation System  

SciTech Connect

In this report we describe the development of the Environmental Risk Evaluation System (ERES), a risk-informed analytical process for estimating the environmental risks associated with the construction and operation of offshore wind energy generation projects. The development of ERES for offshore wind is closely allied to a concurrent process undertaken to examine environmental effects of marine and hydrokinetic (MHK) energy generation, although specific risk-relevant attributes will differ between the MHK and offshore wind domains. During FY10, a conceptual design of ERES for offshore wind will be developed. The offshore wind ERES mockup described in this report will provide a preview of the functionality of a fully developed risk evaluation system that will use risk assessment techniques to determine priority stressors on aquatic organisms and environments from specific technology aspects, identify key uncertainties underlying high-risk issues, compile a wide-range of data types in an innovative and flexible data organizing scheme, and inform planning and decision processes with a transparent and technically robust decision-support tool. A fully functional version of ERES for offshore wind will be developed in a subsequent phase of the project.

Anderson, Richard M.; Copping, Andrea E.; Van Cleve, Frances B.; Unwin, Stephen D.; Hamilton, Erin L.

2010-06-01T23:59:59.000Z

114

Energy Efficiency and Environmental Impact Analyses of Supermarket Refrigeration Systems  

SciTech Connect

This paper presents energy and life cycle climate performance (LCCP) analyses of a variety of supermarket refrigeration systems to identify designs that exhibit low environmental impact and high energy efficiency. EnergyPlus was used to model refrigeration systems in a variety of climate zones across the United States. The refrigeration systems that were modeled include the traditional multiplex DX system, cascade systems with secondary loops and the transcritical CO2 system. Furthermore, a variety of refrigerants were investigated, including R-32, R-134a, R-404A, R-1234yf, R-717, and R-744. LCCP analysis was used to determine the direct and indirect carbon dioxide emissions resulting from the operation of the various refrigeration systems over their lifetimes. Our analysis revealed that high-efficiency supermarket refrigeration systems may result in up to 44% less energy consumption and 78% reduced carbon dioxide emissions compared to the baseline multiplex DX system. This is an encouraging result for legislators, policy makers and supermarket owners to select low emission, high-efficiency commercial refrigeration system designs for future retrofit and new projects.

Fricke, Brian A [ORNL] [ORNL; Bansal, Pradeep [ORNL] [ORNL; Zha, Shitong [Hillphoenix] [Hillphoenix

2013-01-01T23:59:59.000Z

115

Life Cycle Assessment of Wastewater Systems:? Influence of System Boundaries and Scale on Calculated Environmental Loads  

Science Journals Connector (OSTI)

Life cycle assessment (LCA) methodology was used to compare the environmental loads from wastewater systems with different technical solutions. ... The separation systems outperformed the conventional systems by showing lower emissions to water and more efficient recycling of nutrients to agriculture, especially of nitrogen but also of phosphorus. ...

Margareta Lundin; Magnus Bengtsson; Sverker Molander

1999-12-02T23:59:59.000Z

116

The Added Economic and Environmental Value of Solar Thermal Systems in Microgrids with Combined Heat and Power  

E-Print Network (OSTI)

Environmental Value of Solar Thermal Systems in MicrogridsEnvironmental Value of Solar Thermal Systems in Microgridsa) ABSTRACT The addition of solar thermal and heat storage

Marnay, Chris

2010-01-01T23:59:59.000Z

117

Aligning National Environmental Policy Act Process with Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Aligning National Environmental Policy Act Process with Environmental Management Systems Aligning National Environmental Policy Act Process with Environmental Management Systems...

118

Components of an environmental observatory information system Jeffery S. Horsburgh a,n  

E-Print Network (OSTI)

of cyberinfrastructure. In this paper, we describe the architecture and functional requirements for an environmentalComponents of an environmental observatory information system Jeffery S. Horsburgh a,n , David G and Environmental Engineering, Utah State University, Logan, UT, USA b Center for Research in Water Resources

Tarboton, David

119

ENVIRONMENTAL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

797 797 FINAL ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE FOR THE AGUA CALIENTE SOLAR PROJECT IN YUMA COUNTY, ARIZONA U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 November 2010 TABLE OF CONTENTS Section Page Executive Summary .................................................................................................................ES-1 Introduction ..........................................................................................................................ES-1 Purpose and Need ...............................................................................................................ES-1 Proposed Action and Alternatives........................................................................................ES-2

120

Data:01f16663-5074-40ab-b538-ae63426478ad | Open Energy Information  

Open Energy Info (EERE)

3-5074-40ab-b538-ae63426478ad 3-5074-40ab-b538-ae63426478ad No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Evansville, Wisconsin (Utility Company) Effective date: 2012/09/01 End date if known: Rate name: Cp-3 Industrial Power TOD Service above 1,000kW Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0762 per kilowatt-hour.

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Data:1623468c-13d6-4cbb-96ab-b1008551e6bd | Open Energy Information  

Open Energy Info (EERE)

c-13d6-4cbb-96ab-b1008551e6bd c-13d6-4cbb-96ab-b1008551e6bd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Carroll County REMC Effective date: 2012/04/01 End date if known: Rate name: GENERAL SERVICE - NON DEMAND RATE SCHEDULE Sector: Commercial Description: Facilities Charge - $28.00 Transformer Capacity Charge - kVa $37.5 - $10.00 Energy Charge - All kWh $0.0951 per kWh Source or reference: http://www.cwremc.com/index.php?option=com_content&view=article&id=139&Itemid=86 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

122

GENII (Generation II): The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project  

SciTech Connect

The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs.

Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

1988-09-01T23:59:59.000Z

123

Columbia River System Operation Review : Final Environmental Impact Statement, Appendix T (Second Continued Volume): Comments & Responses.  

SciTech Connect

This is Appendix T (second continued volume) giving public comments and responses to the final environmental impact statement for the Columbia River System.

Columbia River System Operation Review (U.S.)

1995-11-01T23:59:59.000Z

124

PLATO Power--a robust, low environmental impact power generation system for the Antarctic plateau  

E-Print Network (OSTI)

PLATO Power--a robust, low environmental impact power generation system for the Antarctic plateau the power generation and management system of PLATO. Two redundant arrays of solar panels and a multiply astronomical facilities on the Antarctic plateau, offering minimum environmental impact and requiring minimal

Ashley, Michael C. B.

125

WiSARDNET: A SYSTEM SOLUTION FOR HIGH PERFORMANCE IN SITU ENVIRONMENTAL MONITORING  

E-Print Network (OSTI)

WiSARDNET: A SYSTEM SOLUTION FOR HIGH PERFORMANCE IN SITU ENVIRONMENTAL MONITORING Zijiang Yang-temporal monitoring of environmental and ecosystems processes. WiSARDNet is a complete distributed sensing system. These features, combined with an energy-efficient hardware/software architecture and network protocol stack

126

Modeling the Impact of Product Portfolio on the Economic and Environmental Performance of Recycling Systems  

E-Print Network (OSTI)

hrough the development of a general model of electronics recycling systems, the effect of product portfolio choices on economic and environmental system performance is explored. The general model encompasses the three main ...

Dahmus, Jeffrey B.

127

United States Environmental Monitoring EPAJ60014-901016 Environmental Protection Systems Laboratory DOE/DP/00539-062  

Office of Legacy Management (LM)

EPAJ60014-901016 EPAJ60014-901016 Environmental Protection Systems Laboratory DOE/DP/00539-062 Agency P.O. Box 93478 May 1990 Las Vegas NV 891 93-3478 Research and Development - Offsite Environmental lcrgw Monitoring Report Radiation Monitoring d ,& Around United States Nuclear Test Areas Calendar Year 1989 This page intentionally left blank EPN60014-90/016 DOEIDP100539-062 May 1990 Offsite Environmental Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1989 contributors: C. F. Costa, N. R. Sunderland, S. C. Black, M. W. Chilton, B. B. Dicey, W. G. Phillips, C. A. Fontana, R. W. Holloway, C. K. Liu, A. A. Mullen, V. E. Niemann, C. J. Rizzardi, D. D. Smith, D. J. Thome, E. A. Thompson, and Nuclear Radiation Assessment Division

128

Environmental Management System 2 2013 SITE ENVIRONMENTAL REPORT2-1  

E-Print Network (OSTI)

. The purpose of BNL's ISMS is to ensure that the way we do work in- tegrates DOE's five Core Functions and seven Guiding Principles into all work processes. The five Core Functions, as defined by DOE P 450 the Laboratory on behalf of DOE, takes environmental stewardship very seriously. As part of its commitment

129

Animal Environmental Systems Goal: Colorado State University will enhance its focus, depth, and integration in undergraduate education, graduate education,  

E-Print Network (OSTI)

of environmental management systems for air and water quality protection related to animal production systems are to develop new approaches for animal environmental system research management to be more cohesive and moreAnimal Environmental Systems Goal: Colorado State University will enhance its focus, depth

130

ENVIRONMENTAL INFORMATION SYSTEM FOR ANALYSIS AND FORECAST OF AIR POLLUTION (APPLICATION TO SANTIAGO DE CHILE)  

E-Print Network (OSTI)

ENVIRONMENTAL INFORMATION SYSTEM FOR ANALYSIS AND FORECAST OF AIR POLLUTION (APPLICATION Chile and other cities in Chile, air pollution is a dramatic problem. An Environmental Information planning. Using a model-based EIS for air pollution it is possible (i) to study complex source

Bertossi, Leopoldo

131

Environmental Mitigation Technology (Innovative System Testing)-Deployment and Testing of the Alden Hydropower Fish-Friendly Turbine  

Energy.gov (U.S. Department of Energy (DOE))

Environmental Mitigation Technology (Innovative System Testing)-Deployment and Testing of the Alden Hydropower Fish-Friendly Turbine

132

Modern Risk Control Techniques for Improving the Environmental Management System in Romanian HV Installations  

E-Print Network (OSTI)

Abstract Environmental protection keeps on being one of the main concerns of our company, together with the economic efficiency and providing of high quality energy services. The general goal of the environmental policy consists in improving the environmental management system and mitigating the power units ’ negative impact in compliance with the regulations in force. The specific goal accommodates the general goal to substations and electric lines, having as short and medium term target the compliance with the European requirements. As a result, more and more companies organise environmental studies and audits in order to evaluate their environmental performance. But such activities are not sufficient in themselves to provide the certainty that the performances comply to the regulation in force, and to the environment policy requirements. In order to become effective, these studies and audits have to be organised within a structured management, based on modern systems of global pollutants monitoring. These activities correspond to the ever stricter regulation and to the development of the economic policies and similar measures liable to stimulate environmental protection and the interest of the implied parties on environmental issues, sustainable development included. International standards on environmental management aim at providing the interested parties the fundamental elements of an environmental management

unknown authors

133

Annex IV Environmental Webinar: Effects of Energy Removal on Physical Systems  

Energy.gov (U.S. Department of Energy (DOE))

Please mark your calendars for the next Annex IV Environmental webinar titled: Effects of Energy Removal on Physical Systems. Held under the auspices of the Annex IV initiative to the IEA Ocean...

134

Zevenhoven & Kilpinen List of Abbreviations 13.4.2002 Abb.-1 List of abbreviations  

E-Print Network (OSTI)

Chlorofluorocarbon CRT Continuously Regenerating Trap CSTR Continuously Stirred Tank Reactor DBDPE Decabromo diphenyl and electronic equipment EOR Enhanced oil recovery EPA Environmental Protection Agency (USA) EPRI Electric Power Fluidised Bed FGD Flue gas desulphurisation FGR Flue gas recirculation GBF Granular bed filter GHG

Zevenhoven, Ron

135

United States Environmental Monitoring EPA-600/4-81-047 Environmental Protection Systems Laboratory DOE/DP/00539-043  

Office of Legacy Management (LM)

EPA-600/4-81-047 EPA-600/4-81-047 Environmental Protection Systems Laboratory DOE/DP/00539-043 Agency P.O. Box 15027 June 1981 Las Vegas NV 891 14 Research and Development Offsite Environmental Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1980 prepared for the Nevada Operations Office U.S. Department of Energy This page intentionally left blank EPA-60014-81-047 DOE/DP/00539-043 June 1981 OFFSITE ENVIRONMENTAL MONITORING REPORT Radiation moni t o r i ng around U n i t e d States nuclear t e s t areas, calendar y e a r 1980 D. D. Smith, R. F. Grossman, W. D. Corkern, D. J. Thorn6 and R. G. Patzer Envi ronmental Moni t o r i ng Systems Laboratory Las Vegas, Nevada 89114 and J. L. Hopper Reynol ds E l e c t r i c a l & Engineering Company, Inc.

136

Data:36179abb-221d-4a67-a569-1a94d7ec6d09 | Open Energy Information  

Open Energy Info (EERE)

79abb-221d-4a67-a569-1a94d7ec6d09 79abb-221d-4a67-a569-1a94d7ec6d09 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nevada Power Co Effective date: 2012/04/01 End date if known: Rate name: DEFERRED ENERGY ACCOUNTING ADJUSTMENT Sector: Description: APPLICABLE The monthly energy charges for service otherwise applicable under each of the Utility's rate schedules shall be increased or decreased by an adjustment amount in accordance with the authorized Deferred Energy Accounting Adjustment rate specified below Source or reference: https://www.nvenergy.com/company/rates/nnv/electric/schedules/images/DEAA_Electric_North.pdf

137

Data:3992aa71-e30c-4456-9d4d-b6ed0f421abb | Open Energy Information  

Open Energy Info (EERE)

aa71-e30c-4456-9d4d-b6ed0f421abb aa71-e30c-4456-9d4d-b6ed0f421abb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Corn Belt Energy Corporation Effective date: 2006/08/31 End date if known: Rate name: RATE 10 ELECTRIC HEAT FOR RESIDENTIAL & FARM SERVICE Sector: Residential Description: Applicable to residential and farm consumers for electric space heating, subject to the established rules and regulations of the Cooperative. Service under this schedule is limited to installations requiring not more than 400-amp service. Approval of the Cooperative must be obtained prior to installation of any motor requiring starting current in excess of 260 amperes.

138

Data:22f32cbc-3903-46bb-bb67-abb0359ca3f9 | Open Energy Information  

Open Energy Info (EERE)

cbc-3903-46bb-bb67-abb0359ca3f9 cbc-3903-46bb-bb67-abb0359ca3f9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Kittitas County Effective date: End date if known: Rate name: Commercial Wind Power Service- With Plant Investment Sector: Description: Available for services receiving power at 34.5 kV or above, transmissions and sub-transmission capacity. Source or reference: http://www.kittitaspud.com/rate_schedule.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

139

Data:F175ca11-667f-4458-bbfc-abb341c412a3 | Open Energy Information  

Open Energy Info (EERE)

5ca11-667f-4458-bbfc-abb341c412a3 5ca11-667f-4458-bbfc-abb341c412a3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Parallel Generation (20kW or less) - Net Energy Billing Sector: Residential Description: Available for single-phase and three-phase customers where a part or all of the electrical requirements are supplied by the customers' generating facilities, where such facilities have a total generating capability of 20 kW or less, where such facilities are connected in parallel with the utility and where such facilities are approved by the utility.

140

Data:6ddc1e74-5abb-407a-843a-93e257b0ba44 | Open Energy Information  

Open Energy Info (EERE)

ddc1e74-5abb-407a-843a-93e257b0ba44 ddc1e74-5abb-407a-843a-93e257b0ba44 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Groton, South Dakota (Utility Company) Effective date: End date if known: Rate name: Schedule A - Load Management Participating Residential Rates Sector: Residential Description: Schedule A - Load Management Participating Residential Rates Minimum Bill - $20/month which includes 1-100 kwh Next 900 kwh at $.125 per kwh Over 1000 kwh at $.0975 per kwh Source or reference: http://city.grotonsd.gov/electric.html Source Parent: Comments Applicability Demand (kW) Minimum (kW):

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Data:E0405081-abb7-4b6d-b3b1-c318275fb11a | Open Energy Information  

Open Energy Info (EERE)

081-abb7-4b6d-b3b1-c318275fb11a 081-abb7-4b6d-b3b1-c318275fb11a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Holy Cross Electric Assn, Inc Effective date: 2011/07/01 End date if known: Rate name: STREET, HIGHWAY AND AREA LIGHTING: All 75 watt Street Lights & Under Sector: Lighting Description: This rate applies when all fixtures are owned by the consumer and mounted on their poles or decorative standards. Source or reference: http://www.holycross.com/about-us/rates-charges Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

142

Data:Db4abe55-b47a-4ec5-abb7-e61b3930b67a | Open Energy Information  

Open Energy Info (EERE)

abe55-b47a-4ec5-abb7-e61b3930b67a abe55-b47a-4ec5-abb7-e61b3930b67a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ark Valley Elec Coop Assn, Inc Effective date: End date if known: Rate name: Irrigation Service Sector: Industrial Description: * Annual Horsepower Charge $5.50 per HP Source or reference: http://www.arkvalley.com/content/electric-rate-schedules Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

143

Data:26c3a88f-3469-401a-bb16-92138ca7e658 | Open Energy Information  

Open Energy Info (EERE)

f-3469-401a-bb16-92138ca7e658 f-3469-401a-bb16-92138ca7e658 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mid-Kansas Electric Company, LLC (MKEC) Effective date: End date if known: Rate name: Residential Service (Residential General Use) Sector: Residential Description: To all electric service supplied through one (1) meter for residential purposes. Source or reference: Kelly Call List #6 (V2) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

144

Data:Ed342731-0163-43ab-b983-6eda3e8e087c | Open Energy Information  

Open Energy Info (EERE)

31-0163-43ab-b983-6eda3e8e087c 31-0163-43ab-b983-6eda3e8e087c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: OL "HPS" 150 Watt (Enclosed) (Customer owned w/o maintanence) 69 kW Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

145

Data:50e235fe-cb44-491f-b45c-7a91abbe9527 | Open Energy Information  

Open Energy Info (EERE)

fe-cb44-491f-b45c-7a91abbe9527 fe-cb44-491f-b45c-7a91abbe9527 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Story City, Iowa (Utility Company) Effective date: 2004/01/01 End date if known: Rate name: High Pressure sodium - 1000 - Not metered Sector: Lighting Description: Source or reference: Ted binder 1 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

146

Data:44a2d8dd-b42e-4abb-8ef7-77efc7886686 | Open Energy Information  

Open Energy Info (EERE)

b42e-4abb-8ef7-77efc7886686 b42e-4abb-8ef7-77efc7886686 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sumter Electric Member Corp Effective date: 2012/01/01 End date if known: Rate name: Outdoor Lighting Off- Roadway HPS 250 W w/ Aid Sector: Lighting Description: * Fixed Monthly Charge does not include monthly pole rate charges Source or reference: http://www.sumteremc.com/pdfs/OL-9.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

147

Data:8a6abb39-e242-4cf3-aa58-0b883fdd2815 | Open Energy Information  

Open Energy Info (EERE)

abb39-e242-4cf3-aa58-0b883fdd2815 abb39-e242-4cf3-aa58-0b883fdd2815 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc Effective date: End date if known: Rate name: Residential Green Power Sector: Residential Description: *$0.0259 more than monthly residential rate for 100 kWh block of green energy Source or reference: http://www.fec-co.com/svcmembers.htm#securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

148

Data:361844cd-12f3-49ab-b299-14b94674ee76 | Open Energy Information  

Open Energy Info (EERE)

2f3-49ab-b299-14b94674ee76 2f3-49ab-b299-14b94674ee76 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clinton County Elec Coop, Inc Effective date: 2013/02/01 End date if known: Rate name: Schedule 23L - ANNEXATION AREA - THREE-PHASE SERVICE - LARGE Sector: Commercial Description: (a) Available to members of the Cooperative for residential, farm, public building, commercial and industrial requiring single phase service or three phase service subject to the Cooperative's established rules and regulations and rates as established or as may from time to time be adopted by the seller.

149

Data:5bb59269-cfea-4ab8-858a-abb9989f4cf7 | Open Energy Information  

Open Energy Info (EERE)

269-cfea-4ab8-858a-abb9989f4cf7 269-cfea-4ab8-858a-abb9989f4cf7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mid-Kansas Electric Company, LLC (MKEC) Effective date: End date if known: Rate name: Residential Service (Residential Space Heating) V2 Sector: Residential Description: To all electric service supplied through one (1) meter for residential purposes. Source or reference: Kelly Call List #6 (V2) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

150

Data:F078ff6f-4411-4cc5-abb2-9627dde68983 | Open Energy Information  

Open Energy Info (EERE)

ff6f-4411-4cc5-abb2-9627dde68983 ff6f-4411-4cc5-abb2-9627dde68983 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alabama Power Co Effective date: 2013/01/01 End date if known: Rate name: 150W High Pressure Sodium Contemporary Style Decorative Post Top Luminaires Sector: Lighting Description: Source or reference: www.alabamapower.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

151

Data:Df653107-895f-4768-982e-31abb4c0b8e4 | Open Energy Information  

Open Energy Info (EERE)

7-895f-4768-982e-31abb4c0b8e4 7-895f-4768-982e-31abb4c0b8e4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Decatur County Rural E M C Effective date: 2010/04/01 End date if known: Rate name: OPTIONAL RENEWABLE ENERGY RIDER FOR Commercial and Industrial Sector: Residential Description: Available to any member of the Corporation with less than 25 kW monthly demand taking service concurrently under Schedule SP Single Phase Electric Service. The Corporation reserves the right to limit the total number of participants under this Rider. In addition to the total charges determined under Rate Schedule SP applicable to the consumer, the following charge shall apply:

152

Data:29525ae8-b216-41a2-88c9-a4abb1260a10 | Open Energy Information  

Open Energy Info (EERE)

b216-41a2-88c9-a4abb1260a10 b216-41a2-88c9-a4abb1260a10 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Effective date: End date if known: Rate name: Outdoor Lighting Metered Existing Pole HPS 250 W Sector: Lighting Description: Source or reference: http://www.consumersenergy.coop/programs.php?pn=Security%20Lights&pl=securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

153

Data:7abb6335-af9f-4c46-b6f4-0d5b1f807dc9 | Open Energy Information  

Open Energy Info (EERE)

abb6335-af9f-4c46-b6f4-0d5b1f807dc9 abb6335-af9f-4c46-b6f4-0d5b1f807dc9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: RS - Schedule A-1 - City of Lakewood - collectively metered apartments Sector: Residential Description: Available for domestic purposes in residences, apartments, duplex houses and multiple family dwellings. Source or reference: www.mytpu.org/customer-service/rates/power-rates/power-rates-schedules.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

154

Data:9cbda9cf-ac90-450e-abb9-8de540098f12 | Open Energy Information  

Open Energy Info (EERE)

cbda9cf-ac90-450e-abb9-8de540098f12 cbda9cf-ac90-450e-abb9-8de540098f12 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Connecticut Light & Power Co Effective date: 2013/07/01 End date if known: Rate name: RATE 116 STREET AND SECURITY LIGHTING Sector: Lighting Description: AVAILABLE for street, highway, off-street and security lighting for "dusk to dawn" or "midnight" lighting services as provided below. Excludes service off the public highway except where the fixture is mounted on a Company owned distribution pole. Flat Rate Buy is Applicable Across Various Wattages & Types of Lights

155

Data:F51a099a-cfc7-44ab-b836-5c0fcc1bdccc | Open Energy Information  

Open Energy Info (EERE)

99a-cfc7-44ab-b836-5c0fcc1bdccc 99a-cfc7-44ab-b836-5c0fcc1bdccc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lexington, Tennessee (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Small Commercial Sector: Commercial Description: Available to the non-residential customer with monthly demand of 50 kW or less. Service under this Schedule shall be used solely by the contracting Customer in a single enterprise, located entirely on a single site. Source or reference: http://www.lexingtonnc.net/modules/showdocument.aspx?documentid=413 Source Parent: Comments

156

Magnetic Energy Storage System: Superconducting Magnet Energy Storage System with Direct Power Electronics Interface  

SciTech Connect

GRIDS Project: ABB is developing an advanced energy storage system using superconducting magnets that could store significantly more energy than today’s best magnetic storage technologies at a fraction of the cost. This system could provide enough storage capacity to encourage more widespread use of renewable power like wind and solar. Superconducting magnetic energy storage systems have been in development for almost 3 decades; however, past devices were designed to supply power only for short durations—generally less than a few minutes. ABB’s system would deliver the stored energy at very low cost, making it ideal for eventual use in the electricity grid as a costeffective competitor to batteries and other energy storage technologies. The device could potentially cost even less, on a per kilowatt basis, than traditional lead-acid batteries.

None

2010-10-01T23:59:59.000Z

157

Data:53cb8390-cbec-4a5a-bb44-b5722734739d | Open Energy Information  

Open Energy Info (EERE)

-cbec-4a5a-bb44-b5722734739d -cbec-4a5a-bb44-b5722734739d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Florence Utility Comm Effective date: 2009/11/30 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day Three Phase 7am-7pm with Parallel Generation(20 kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0791 per kilowatt-hour. Parallel Generation (20 kW or less) Net Energy Billing - Available for single-phase and three-phase customers where a part or all of the electrical requirements of the customer are supplied by the customer's generating facilities, where such facilities have a total generating capability of 20 kW or less, where such facilities are connected in parallel with the utility and where such facilities are approved by the utility. Rate: The customer shall be billed monthly on a net energy basis and shall pay the fixed charge and energy charge specified in the rate schedule under which he is served. If, in any month, the customer's bill has a credit balance of $25 or less, the amount shall be credited to subsequent bills until a debit balance is reestablished. If the credit balance is more than $25, the utility shall reimburse the customer by check upon request. Monthly credits shall be computed by taking the net excess kilowatt-hours produced times the sum of the applicable energy charge plus monthly power cost adjustment clause (PCAC). This rate will be applied to residential single-phase and three-phase customers for ordinary household purposes. Single-phase motors may not exceed 5 horsepower individual-rated capacity without utility permission.

158

STATEMENT OF CONSIDERATIONS REQUEST BY ALSTOM ENVIRONMENTAL CONTROL SYSTEMS FOR AN ADVANCE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ALSTOM ENVIRONMENTAL CONTROL SYSTEMS FOR AN ADVANCE ALSTOM ENVIRONMENTAL CONTROL SYSTEMS FOR AN ADVANCE WAIVER OF PATENT RIGHTS TO INVENTIONS MADE UNDER SUBCONTRACT QZ001 UNDER COOPERATIVE AGREEMENT DE-FC26-03NT41986; W(A) 05-004; CH-1268 As set out in the attached waiver petition and in subsequent discussions with DOE Patent Counsel, Alstom Environmental Control Systems (Alstom) has requested an advance waiver of domestic and foreign patent rights for all subject inventions made under the above subject subcontract. The waiver will apply only to inventions made by Alstom employees under the subcontract. Alstom is a subcontractor to ADA Environmental Solutions (ADA-ES). under the subject cooperative agreement. ADA-ES is eligible to retain title to its inventions pursuant to P.L. 96- 517. Referring to item 2 of Alstom's petition, the purpose of the subcontract is to evaluate full-

159

Development of environmentally advanced hydropower turbine system design concepts  

SciTech Connect

A team worked together on the development of environmentally advanced hydro turbine design concepts to reduce hydropower`s impact on the environment, and to improve the understanding of the technical and environmental issues involved, in particular, with fish survival as a result of their passage through hydro power sites. This approach brought together a turbine design and manufacturing company, biologists, a utility, a consulting engineering firm and a university research facility, in order to benefit from the synergy of diverse disciplines. Through a combination of advanced technology and engineering analyses, innovative design concepts adaptable to both new and existing hydro facilities were developed and are presented. The project was divided into 4 tasks. Task 1 investigated a broad range of environmental issues and how the issues differed throughout the country. Task 2 addressed fish physiology and turbine physics. Task 3 investigated individual design elements needed for the refinement of the three concept families defined in Task 1. Advanced numerical tools for flow simulation in turbines are used to quantify characteristics of flow and pressure fields within turbine water passageways. The issues associated with dissolved oxygen enhancement using turbine aeration are presented. The state of the art and recent advancements of this technology are reviewed. Key elements for applying turbine aeration to improve aquatic habitat are discussed and a review of the procedures for testing of aerating turbines is presented. In Task 4, the results of the Tasks were assembled into three families of design concepts to address the most significant issues defined in Task 1. The results of the work conclude that significant improvements in fish passage survival are achievable.

Franke, G.F.; Webb, D.R.; Fisher, R.K. Jr. [Voith Hydro, Inc. (United States)] [and others

1997-08-01T23:59:59.000Z

160

ENVIRONMENTAL IMPACT OF HEAVY METAL POLLUTION IN NATURAL AQUATIC SYSTEMS  

E-Print Network (OSTI)

He who taught the use of the pen, Taught man that which he knew not" The distribution of heavy metals between soil and soil solutions is a key issue in evaluating the environmental impact of long term applications of heavy metals to land. Contamination of soils by heavy metals has been reported by many workers. Metal adsorption is affected by many factors, including soil pH, clay mineralogy, abundance of oxides and organic matter, soil composition and solution ionic strength. The pH is one of the many factors affecting mobility of heavy metals in soils and it is likely to be the most easily managed and the most significant. To provide the appropriate level of protection for aquatic life and other uses of the resource, it is important to be able to predict the environmental distribution of important metals on spatial and temporal scales and to do so with particular emphasis on the water column concentrations. Regulatory levels reflected in water quality criteria or standards are based on

Muhammad Rehan Tayab

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

A Comparative Study on the Environmental Impact of CO2 Supermarket Refrigeration Systems  

SciTech Connect

Supermarket refrigeration systems have high environmental impact due to their large refrigerant charge and high leak rates. Accordingly, the interest in using natural refrigerants, such as carbon dioxide (CO2), and new refrigerant blends with low GWP in such systems is increasing. In this paper, an open-source Life Cycle Climate Performance (LCCP) framework is presented and used to compare the environmental impact of three supermarket refrigeration systems. These systems include a transcritical CO2 booster system, a cascade CO2/N-40 system, and a baseline R-404A multiplex direct expansion system. The study is performed for cities representing different climates within the USA using EnergyPlus to simulate the systems' hourly performance. Finally, a parametric analysis is performed to study the impact of annual leak rate on the systems' LCCP.

Beshr, Mohamed [University of Maryland, College Park; Aute, Vikrant [University of Maryland, College Park; Sharma, Vishaldeep [ORNL; Abdelaziz, Omar [ORNL; Fricke, Brian A [ORNL; Radermacher, Reinhard [University of Maryland, College Park

2014-01-01T23:59:59.000Z

162

Environmental Management System (EMS) objectives&targets annual results summary : FY2012.  

SciTech Connect

Sandia National Laboratories/New Mexico's (SNL/NM) Environmental Management System is the integrated approach for members of the workforce to identify and manage environmental risks. Each Fiscal Year (FY) SNL/NM performs an analysis to identify environmental aspects, and the environmental programs associated with them are charged with the task of routinely monitoring and measuring the objectives and targets that are established to mitigate potential impacts of SNL/NM's operations on the environment. An annual summary of the results achieved towards meeting established objectives and targets provides a connection to, and rational for, annually revised environmental aspects. The purpose of this document is to summarize the results achieved and documented in FY2012.

Vetter, Douglas Walter

2013-02-01T23:59:59.000Z

163

Environmental Management System 2 2012 SITE ENVIRONMENTAL REPORT2-1  

E-Print Network (OSTI)

work integrates DOE's five Core Functions and seven Guiding Principles into all work processes. The five Core Functions, as de- fined by DOE P 450.4, Safety Management System Policy, are: DEFINE for discovery. Brookhaven Science Associates (BSA), the contractor operating the Laboratory on behalf of DOE

164

Environmental Management System 2 2011 SITE ENVIRONMENTAL REPORT2-1  

E-Print Network (OSTI)

that the way we do work integrates DOE's five Core Functions and seven Guiding Principles into all work pro- cesses. The five Core Functions, as defined by DOE P 450.4, Safety Management System Policy, are: DEFINE for discovery. Brookhaven Science Associates (BSA), the contractor operating the Laboratory on behalf of DOE

165

Task 11 - systems analysis of environmental management technologies  

SciTech Connect

A review was conducted of three systems analysis (SA) studies performed by Lockheed Idaho Technologies Company (LITCO) on integrated thermal treatment systems (ITTs) and integrated nonthermal treatment systems (INTSs) for the remediation of mixed low-level waste (MLLW) stored throughout the U.S. Department of Energy (DOE) weapons complex. The review was performed by an independent team led by the Energy & Environment Research Center (EERC), including Science Applications International Corporation (SAIC), the Waste Policy Institute (WPI), and Virginia Tech.

Musich, M.A.

1997-06-01T23:59:59.000Z

166

Final Environmental Impact Statement for the Tank Waste Remediation System, Hanford Site, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for the Tank Waste Remediation System, Hanford Site, Richland, Washington for the Tank Waste Remediation System, Hanford Site, Richland, Washington file:///I|/Data%20Migration%20Task/EIS-0189-FEIS-Summary-1996.HTM[6/27/2011 11:21:59 AM] The National Environmental Policy Act (NEPA) requires Federal agencies to analyze the potential environmental impacts of their proposed actions to assist them in making informed decisions. A similar Washington State law, the State Environmental Policy Act (SEPA), requires State agencies, including the Washington State Department of Ecology (Ecology), to analyze environmental impacts before making decisions that could impact the environment. A major emphasis of both laws is to promote public awareness of these actions and provide opportunities for public involvement. Because NEPA and SEPA requirements are similar, the U.S. Department of Energy (DOE) and Ecology

167

Long-term surveillance and maintenance Geo-spatial Environmental Mapping System  

SciTech Connect

For sites currently under the U.S. Department of Energy (DOE) Office of Legacy Management (LM) and for sites transitioning to LM, technical, operational, and environmental monitoring information continues to be of great interest to stakeholders. The Web-based Geo-spatial Environmental Mapping System (GEMS) developed by LM provides stakeholders, DOE, regulators, project staff, and the public with a user-friendly mechanism for retrieving geo-spatial and environmental monitoring information about the sites. This paper discusses GEMS and its use by LM stakeholders. (authors)

Appetta, J. [U.S. Department of Energy Office of Legacy Management, Pittsburgh, PA (United States); MacMillan, S.; Miller, K.; LaBonte, E. [S.M. Stoller Corporation, Junction, CO (United States)

2007-07-01T23:59:59.000Z

168

Environmental sustainability comparison of a hypothetical pneumatic waste collection system and a door-to-door system  

SciTech Connect

Highlights: Black-Right-Pointing-Pointer We compare the environmental sustainability of two MSW collection systems. Black-Right-Pointing-Pointer We evaluate pneumatic and door-to-door collection systems. Black-Right-Pointing-Pointer The greenhouse gas emissions of pneumatic collection are around three times higher. Black-Right-Pointing-Pointer System components are decisive but assumptions on electricity use are also important. Black-Right-Pointing-Pointer Pneumatic collection could provide other benefits over door-to-door system. - Abstract: Waste collection is one of the life cycle phases that influence the environmental sustainability of waste management. Pneumatic waste collection systems represent a new way of arranging waste collection in densely populated urban areas. However, limited information is available on the environmental impacts of this system. In this study, we compare the environmental sustainability of conventional door-to-door waste collection with its hypothetical pneumatic alternative. Furthermore, we analyse whether the size of the hypothetical pneumatic system, or the number of waste fractions included, have an impact on the results. Environmental loads are calculated for a hypothetical pneumatic waste collection system modelled on an existing dense urban area in Helsinki, Finland, and the results are compared to those of the prevailing, container-based, door-to-door waste collection system. The evaluation method used is the life-cycle inventory (LCI). In this study, we report the atmospheric emissions of greenhouse gases (GHG), SO{sub 2} and NO{sub x}. The results indicate that replacing the prevailing system with stationary pneumatic waste collection in an existing urban infrastructure would increase total air emissions. Locally, in the waste collection area, emissions would nonetheless diminish, as collection traffic decreases. While the electricity consumption of the hypothetical pneumatic system and the origin of electricity have a significant bearing on the results, emissions due to manufacturing the system's components prove decisive.

Punkkinen, Henna, E-mail: henna.punkkinen@vtt.fi [VTT Technical Research Centre of Finland, Biologinkuja 7, P.O. Box 1000, FI-02044 VTT (Finland); Merta, Elina, E-mail: elina.merta@vtt.fi [VTT Technical Research Centre of Finland, Biologinkuja 7, P.O. Box 1000, FI-02044 VTT (Finland); Teerioja, Nea, E-mail: nea.teerioja@helsinki.fi [University of Helsinki, Department of Economics and Management, Latokartanonkaari 9, P.O. Box 27, FI-00014 HY (Finland); Moliis, Katja, E-mail: katja.moliis@helsinki.fi [University of Helsinki, Department of Economics and Management, Latokartanonkaari 9, P.O. Box 27, FI-00014 HY (Finland); Kuvaja, Eveliina, E-mail: eveliina.kuvaja@helsinki.fi [University of Helsinki, Department of Economics and Management, Latokartanonkaari 9, P.O. Box 27, FI-00014 HY (Finland)

2012-10-15T23:59:59.000Z

169

Life Cycle environmental Assessment (LCA) of sanitation systems including sewerage: Case of vertical  

E-Print Network (OSTI)

Life Cycle environmental Assessment (LCA) of sanitation systems including sewerage: Case The article presents the application of Life Cycle Assessment (LCA) to a complete sanitation system including the sewer network. It first describes the LCA hypothesis which concerns two types of waste water

Paris-Sud XI, Université de

170

A Simulation Tool for Real-time Systems using Environmental Energy Harvesting Maryline CHETTO  

E-Print Network (OSTI)

, the system operates in a so-called energy neutral mode by consuming only as much energy as harvested. The simulator enables to construct an optimal schedule for any task set, battery capacity and energy sourceA Simulation Tool for Real-time Systems using Environmental Energy Harvesting Maryline CHETTO

Paris-Sud XI, Université de

171

Modeling Multi-Reservoir Hydropower Systems in the Sierra Nevada with Environmental Requirements and Climate Warming  

E-Print Network (OSTI)

i Modeling Multi-Reservoir Hydropower Systems in the Sierra Nevada with Environmental Requirements and the Sierra Nevada, their majestic backyard. #12;iii Abstract Hydropower systems and other river regulation that ecosystems have historically depended on. These effects are compounded at regional scales. As hydropower

Lund, Jay R.

172

Maximum entropy production in environmental and ecological systems  

Science Journals Connector (OSTI)

...practical level, the MEP principle could pave the way for better and more theoretically grounded parameterizations in Earth system models of different complexities. Here, MEP would play a critical role in scaling spatial heterogeneities and temporal...

2010-01-01T23:59:59.000Z

173

E-Print Network 3.0 - abb-2901 fuel pellet Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

P.O. Box 1663, Los Alamos, NM 87545 USA... fueling systems in support of magnetic fusion energy, particularly the International Thermonuclear... - tritium (D-T) gas puffing...

174

E-Print Network 3.0 - abb-ce light water Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Supplier Beginning in 1999... , community water supply systems must provide an annual report describ- ing the quality of their drinking Source: Fernndez-Juricic, Esteban -...

175

Functional issues and environmental qualification of digital protection systems of advanced light-water nuclear reactors  

SciTech Connect

Issues of obsolescence and lack of infrastructural support in (analog) spare parts, coupled with the potential benefits of digital systems, are driving the nuclear industry to retrofit analog instrumentation and control (I&C) systems with digital and microprocessor-based systems. While these technologies have several advantages, their application to safety-related systems in nuclear power plants raises key issues relating to the systems` environmental qualification and functional reliability. To bound the problem of new I&C system functionality and qualification, the authors focused this study on protection systems proposed for use in ALWRs. Specifically, both functional and environmental qualification issues for ALWR protection system I&C were addressed by developing an environmental, functional, and aging data template for a protection division of each proposed ALWR design. By using information provided by manufacturers, environmental conditions and stressors to which I&C equipment in reactor protection divisions may be subjected were identified. The resulting data were then compared to a similar template for an instrument string typically found in an analog protection division of a present-day nuclear power plant. The authors also identified fiber-optic transmission systems as technologies that are relatively new to the nuclear power plant environment and examined the failure modes and age-related degradation mechanisms of fiber-optic components and systems. One reason for the exercise of caution in the introduction of software into safety-critical systems is the potential for common-cause failure due to the software. This study, however, approaches the functionality problem from a systems point of view. System malfunction scenarios are postulated to illustrate the fact that, when dealing with the performance of the overall integrated system, the real issues are functionality and fault tolerance, not hardware vs. software.

Korsah, K.; Clark, R.L.; Wood, R.T. [Oak Ridge National Lab., TN (United States)

1994-04-01T23:59:59.000Z

176

Campus Sustainability Planetary Health Ecological Design Social and Environmental Enterprise Incuba-tion EcoVillages Sustainable Food Systems Ecoliteracy Solutions Journal Campus Systems Model Energy  

E-Print Network (OSTI)

Villages Sustainable Food Systems Ecoliteracy Solutions Journal Campus Systems Model Energy Conservation, Efficiency1 Campus Sustainability Planetary Health Ecological Design Social and Environmental Enterprise Incuba- tion EcoVillages Sustainable Food Systems Ecoliteracy Solutions Journal Campus Systems Model

Hayden, Nancy J.

177

GENII: The Hanford Environmental Radiation Dosimetry Software System: Volume 1, Conceptual representation  

SciTech Connect

The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). The purpose of this coupled system of computer codes is to analyze environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil. This is accomplished by calculating radiation doses to individuals or populations. GENII is described in three volumes of documentation. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. The third volume is a Code Maintenance Manual for the user who requires knowledge of code detail. It includes code logic diagrams, global dictionary, worksheets, example hand calculations, and listings of the code and its associated data libraries. 72 refs., 15 figs., 34 tabs.

Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

1988-12-01T23:59:59.000Z

178

Improving Indoor Environmental Quality And Energy Performance Of Modular Classroom HVAC Systems  

E-Print Network (OSTI)

INDOOR ENVIRONMENTAL QUALITY AND ENERGY PERFORMANCE OFINDOOR ENVIRONMENTAL QUALITY AND ENERGY PERFORMANCE OFEnergy efficiency and indoor environmental quality (IEQ) are

Apte, Michael G.; Spears, Michael; Lai, Chi-Ming; Shendell, Derek G.

2005-01-01T23:59:59.000Z

179

The role of environmental correlations in the non-Markovian dynamics of a spin system  

E-Print Network (OSTI)

We put forward a framework to study the dynamics of a chain of interacting quantum particles affected by individual or collective multi-mode environment, focussing on the role played by the environmental quantum correlations over the evolution of the chain. The presence of entanglement in the state of the environmental system magnifies the non-Markovian nature of the chain's dynamics, giving rise to structures in figures of merit such as entanglement and purity that are not observed under a separable multi-mode environment. Our analysis can be relevant to problems tackling the open-system dynamics of biological complexes of strong current interest.

Salvatore Lorenzo; Francesco Plastina; Mauro Paternostro

2011-06-27T23:59:59.000Z

180

Hanford Environmental Information System (HEIS) Operator`s Manual. Volume 1  

SciTech Connect

The Hanford Environmental Information System (HEIS) is a consolidated set of automated resources that effectively manage the data gathered during environmental monitoring and restoration of the Hanford Site. The HEIS includes an integrated database that provides consistent and current data to all users and promotes sharing of data by the entire user community. This manual describes the facilities available to the operational user who is responsible for data entry, processing, scheduling, reporting, and quality assurance. A companion manual, the HEIS User`s Manual, describes the facilities available-to the scientist, engineer, or manager who uses the system for environmental monitoring, assessment, and restoration planning; and to the regulator who is responsible for reviewing Hanford Site operations against regulatory requirements and guidelines.

Schreck, R.I.

1991-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Martin Marietta Energy Systems Environmental Management Plan, FY 1985-1989  

SciTech Connect

This plan contains the most recent revisions (as of April 1, 1985) identifying and resolving environmental problems during the next five years at the four installations managed for DOE by Martin Marietta Energy Systems, Inc. (Energy Systems). These installations are Oak Ridge National Laboratory (ORNL), Oak Ridge Gaseous Diffusion Plant (ORGDP), Oak Ridge Y-12 Plant (Y-12), and Paducah Gaseous Diffusion Plant (PGDP). The report is not an exhaustive catalogue of environmental programs for which funds will be or have been requested. The thrust is to categorize the environmental challenges by the nature of the challenge. The challenges are identified by categories: (1) radioactive waste, (2) hazardous waste, (3) co-contaminated waste (hazardous and radioactive contaminated), (4) conventional waste, (5) monitoring, and (6) remedial actions and decommissioning.

Furth, W.F.; Cowser, K.E.; Jones, C.G.; Mitchell, M.E.; Perry, T.P.A.; Stair, C.L.; Stinton, L.H.

1985-05-01T23:59:59.000Z

182

Integrated Systems-Based Approach to Monitoring Environmental Remediation  

SciTech Connect

The US Department of Energy (DOE) is responsible for risk reduction and cleanup of its nuclear weapons complex. Remediation strategies for some of the existing contamination use techniques that mitigate risk, but leave contaminants in place. Monitoring to verify remedy performance and long-term mitigation of risk is a key element for implementing these strategies and can be a large portion of the total cost of remedy implementation. Especially in these situations, there is a need for innovative monitoring approaches that move away from the cost and labor intensive point-source monitoring. A systems-based approach to monitoring design focuses monitoring on controlling features and processes to enable effective interpretation of remedy performance.

Bunn, Amoret L.; Truex, Michael J.; Oostrom, Martinus; Carroll, Kenneth C.; Wellman, Dawn M.

2013-02-24T23:59:59.000Z

183

Integrated Systems-Based Approach to Monitoring Environmental Remediation - 13211  

SciTech Connect

The US Department of Energy (DOE) is responsible for risk reduction and cleanup of its nuclear weapons complex. Remediation strategies for some of the existing contamination use techniques that mitigate risk, but leave contaminants in place. Monitoring to verify remedy performance and long-term mitigation of risk is a key element for implementing these strategies and can be a large portion of the total cost of remedy implementation. Especially in these situations, there is a need for innovative monitoring approaches that move away from the cost and labor intensive point-source monitoring. A systems-based approach to monitoring design focuses monitoring on controlling features and processes to enable effective interpretation of remedy performance. (authors)

Truex, Mike; Oostrom, Mart; Carroll, K.C.; Bunn, Amoret; Wellman, Dawn [Pacific Northwest National Laboratory (PNNL), Richland, Washington (United States)] [Pacific Northwest National Laboratory (PNNL), Richland, Washington (United States)

2013-07-01T23:59:59.000Z

184

Assessing the prospective environmental impacts of photovoltaic systems based on a simplified LCA model  

E-Print Network (OSTI)

Assessing the prospective environmental impacts of photovoltaic systems based on a simplified LCA cycle analysis (LCA). However, LCA requires the collection of a large amount of data and is thus time-consuming. Besides, LCA results found in the literature corresponding to the photovoltaic energy pathway show a large

Paris-Sud XI, Université de

185

Project Information Form Project Title Environmentally Friendly Driving Feedback Systems Research and  

E-Print Network (OSTI)

Provided (by each agency or organization) Caltrans $136,000 Total Project Cost $136,000 Agency IDProject Information Form Project Title Environmentally Friendly Driving Feedback Systems Research of Research Project Among several strategies to reduce fuel consumption and greenhouse gas emissions from

California at Davis, University of

186

HEALTH, SAFETY AND ENVIRONMENTAL MANAGEMENT SYSTEM Safety Regulations and Policies for Offices  

E-Print Network (OSTI)

HEALTH, SAFETY AND ENVIRONMENTAL MANAGEMENT SYSTEM Safety Regulations and Policies for Offices #12;University of Saskatchewan HSEMS Safety Regulations and Policies for Offices Version 1 ­ February 1, 2011 1 Table of Contents University of Saskatchewan Policies Relating to Health, Safety and Environment

Saskatchewan, University of

187

Environmental Alteration Analysis of a Large System of Reservoirs: Application to the Connecticut River Watershed  

E-Print Network (OSTI)

i Environmental Alteration Analysis of a Large System of Reservoirs: Application to the Connecticut bring me on to the Connecticut River project and guided me through all the many aspects of the work that went into both the Connecticut Project and this thesis. I would also like to thank employees at New

Pasternack, Gregory B.

188

Integration of coal utilization and environmental control in integrated gasification combined cycle systems  

Science Journals Connector (OSTI)

Integration of coal utilization and environmental control in integrated gasification combined cycle systems ... The Cost of Carbon Capture and Storage for Natural Gas Combined Cycle Power Plants ... The Cost of Carbon Capture and Storage for Natural Gas Combined Cycle Power Plants ...

H. Christopher Frey; Edward S. Rubin

1992-10-01T23:59:59.000Z

189

Surface water drainage system. Environmental assessment and finding of no significant impact  

SciTech Connect

This Environmental Assessment (EA) is written pursuant to the National Environmental Policy Act (NEPA). The document identifies and evaluates the action proposed to correct deficiencies in, and then to maintain, the surface water drainage system serving the Department of Energy`s Rocky Flats Environmental Technology Site (Site), located north of Golden, Colorado. Many of the activities proposed would not normally be subject to this level of NEPA documentation. However, in many cases, maintenance of the system has been deferred to the point that wetlands vegetation has become established in some ditches and culverts, creating wetlands. The proposed activities would damage or remove some of these wetlands in order to return the drainage system to the point that it would be able to fully serve its intended function - stormwater control. The Department of Energy (DOE) regulations require that activities affecting environmentally sensitive areas like wetlands be the subject of an EA. Most portions of the surface water drainage system are presently inadequate to convey the runoff from a 100-year storm event. As a result, such an event would cause flooding across much of the Site and possibly threaten the integrity of the dams at the terminal ponds. Severe flooding would not only cause damage to facilities and equipment, but could also facilitate the transport of contaminants from individual hazardous substance sites (IHSSs). Uncontrolled flow through the A- and B-series ponds could cause contaminated sediments to become suspended and carried downstream. Additionally, high velocity flood flows significantly increase erosion losses.

NONE

1996-05-01T23:59:59.000Z

190

Environmental Compliance Audit & Assessment Program Manual  

E-Print Network (OSTI)

include: Storm Water Management Environmental Services DavidEnvironmental Management System Environmental Radiation Protection Environmental Restoration Hazardous Waste Fixed Treatment Units Storm WaterEnvironmental Management System Environmental Radiation Protection Environmental Restoration Hazardous Waste Fixed Treatment Units Storm Water

Thorson, Patrick

2009-01-01T23:59:59.000Z

191

Role of environmental correlations in the non-Markovian dynamics of a spin system  

SciTech Connect

We study the dynamics of a chain of interacting quantum particles affected by an individual or collective environment(s), focusing on the role played by the environmental quantum correlations over the evolution of the chain. The presence of entanglement in the state of the environment magnifies the non-Markovian nature of the chain's dynamics, giving rise to structures in figures of merit such as spin entanglement and purity that are not observed under a separable environmental state. Our analysis can be relevant to problems tackling the open-system dynamics of biological complexes of strong current interest.

Lorenzo, Salvatore [Dipartimento di Fisica, Universita della Calabria, I-87036 Arcavacata di Rende (Italy); INFN - Gruppo collegato di Cosenza, I-87036 Arcavacata di Rende, Cosenza (Italy); Centre for Theoretical Atomic, Molecular and Optical Physics, School of Mathematics and Physics, Queen's University, Belfast BT7 1NN (United Kingdom); Plastina, Francesco [Dipartimento di Fisica, Universita della Calabria, I-87036 Arcavacata di Rende (Italy); INFN - Gruppo collegato di Cosenza, I-87036 Arcavacata di Rende, Cosenza (Italy); Paternostro, Mauro [Centre for Theoretical Atomic, Molecular and Optical Physics, School of Mathematics and Physics, Queen's University, Belfast BT7 1NN (United Kingdom)

2011-09-15T23:59:59.000Z

192

Supplemental mathematical formulations, Atmospheric pathway: The Multimedia Environmental Pollutant Assessment System (MEPAS)  

SciTech Connect

The Multimedia Environmental Pollutant Assessment System (MEPAS) is an integrated software implementation of physics-based fate and transport models for health and environmental risk assessments of both radioactive and hazardous pollutants. This atmospheric component report is one of a series of formulation reports that document the MEPAS mathematical models. MEPAS is a ``multimedia`` model; pollutant transport is modeled within, through, and between multiple media (air, soil, groundwater, and surface water). The estimated concentrations in the various media are used to compute exposures and impacts to the environment, to maximum individuals, and to populations.

Droppo, J.G.; Buck, J.W.

1996-03-01T23:59:59.000Z

193

Geographic information systems (GIS) for participation: the future of environmental GIS?  

Science Journals Connector (OSTI)

The conventional uses of geographic information systems (GIS) in environmental management have been criticized for being undemocratic and avoiding the social dimension of these issues. To address these criticisms, new participatory approaches are being developed by the GIS community. These new techniques involve the integration of conventional spatial data and mental maps showing communities' (or various groups') perceptions of their environment and how they use resources. Case studies using these new techniques highlight how GIS is being incorporated into participatory studies. The advantages and drawbacks of using GIS for participation are discussed, with the conclusion that the techniques provide a useful new approach for environmental management.

Steve Cinderby

1999-01-01T23:59:59.000Z

194

Gas mixing system for imaging of nanomaterials under dynamic environments by environmental transmission electron microscopy  

SciTech Connect

A gas mixing manifold system that is capable of delivering a stable pressure stream of a desired composition of gases into an environmental transmission electron microscope has been developed. The system is designed to provide a stable imaging environment upon changes of either the composition of the gas mixture or upon switching from one gas to another. The design of the system is described and the response of the pressure inside the microscope, the sample temperature, and sample drift in response to flow and composition changes of the system are reported.

Akatay, M. Cem [School of Materials Engineering and Birck Nanotechnology Center, Purdue University, West Lafayette, Indiana 47907 (United States)] [School of Materials Engineering and Birck Nanotechnology Center, Purdue University, West Lafayette, Indiana 47907 (United States); Zvinevich, Yury; Ribeiro, Fabio H., E-mail: fabio@purdue.edu, E-mail: estach@bnl.gov [Forney Hall of Chemical Engineering, Purdue University, West Lafayette, Indiana 47907 (United States); Baumann, Philipp [Computer Sciences, University of Applied Sciences of Northeastern Switzerland, 4132 Muttenz, Switzerland and Department of Physics, Yeshiva University, New York, New York 10016 (United States)] [Computer Sciences, University of Applied Sciences of Northeastern Switzerland, 4132 Muttenz, Switzerland and Department of Physics, Yeshiva University, New York, New York 10016 (United States); Stach, Eric A., E-mail: fabio@purdue.edu, E-mail: estach@bnl.gov [Center for Functional Nanomaterials, Brookhaven National Laboratory, Upton, New York 11973 (United States)

2014-03-15T23:59:59.000Z

195

FINAL ENVIRONMENTAL ASSESSMENT FOR A COMBINED POWER AND BIOMASS HEATING SYSTEM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR A COMBINED POWER AND BIOMASS HEATING SYSTEM FORT YUKON, ALASKA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy GOLDEN FIELD OFFICE In Cooperation with USDA RURAL UTILITIES SERVICE DENALI COMMISSION APRIL 2013 ABBREVIATIONS AND ACRONYMS ADEC Alaska Department of Environmental Conservation AFRPA Alaska Forest Resources Practices Act BFE Base Flood Elevation BMP best management practice BTU British Thermal Unit CATG Council of Athabascan Tribal Governments CEQ Council on Environmental Quality CFR Code of Federal Regulations CHP Combined Heat and Power CO carbon monoxide CO 2 carbon dioxide CWA Clean Water Act dBA A-weighted decibel DBH diameter at breast height DOE U.S. Department of Energy EA Environmental Assessment

196

Designing Biological Systems for Sustainability and Programmed Environmental Interface (2011 JGI User Meeting)  

ScienceCinema (OSTI)

The U.S. Department of Energy Joint Genome Institute (JGI) invited scientists interested in the application of genomics to bioenergy and environmental issues, as well as all current and prospective users and collaborators, to attend the annual DOE JGI Genomics of Energy & Environment Meeting held March 22-24, 2011 in Walnut Creek, Calif. The emphasis of this meeting was on the genomics of renewable energy strategies, carbon cycling, environmental gene discovery, and engineering of fuel-producing organisms. The meeting features presentations by leading scientists advancing these topics. Pam Silver of Harvard University gives a presentation on "Designing Biological Systems for Sustainability and Programmed Environmental Interface" at the 6th annual Genomics of Energy & Environment Meeting on March 23, 2011

Silver, Pam [Harvard University

2011-06-03T23:59:59.000Z

197

Environmental Microbiology  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Microbiology Environmental Microbiology Environmental Microbiology Los Alamos working to identify genetic regulatory systems in single microorganisms. Get Expertise Cheryl Kuske DOE BER Biological System Science Division Program Manager Email Srinivas Iyer Bioscience Group Leader Email Rebecca McDonald Bioscience Communications Email Examining the soil beneath our feet Environmental microbiology Read caption + Many environmental molecular biology studies begin with purified DNA and RNA extracted from the soil. Overview of Research and Highlights Learning about microorganisms-bacteria, algae, and fungi-is essential to understanding how living things interact with their environments. Exploration of environmental microbiology at Los Alamos crosses broad scales of investigation that span from identification of genetic regulatory

198

Modeling of integrated environmental control systems for coal-fired power plants  

SciTech Connect

The general goal of this research project is to enhance, and transfer to DOE, a new computer simulation model for analyzing the performance and cost of environmental control systems for coal-fired power plants. Systems utilizing pre-combustion, combustion, or post-combustion control methods, individually or in combination, may be considered. A unique capability of this model is the probabilistic representation of uncertainty in model input parameters. This stochastic simulation capability allows the performance and cost of environmental control systems to be quantified probabilistically, accounting for the interactions among all uncertain process and economic parameters. This method facilitates more rigorous comparisons between conventional and advanced clean coal technologies promising improved cost and/or effectiveness for SO{sub 2} and NO{sub x} removal. Detailed modeling of several pre-combustion and post-combustion processes of interest to DOE/PETC have been selected for analysis as part of this project.

Rubin, E.S.

1989-10-01T23:59:59.000Z

199

Environmental assessment of the thermal neutron activation explosive detection system for concourse use at US airports  

SciTech Connect

This document is an environmental assessment of a system designed to detect the presence of explosives in checked airline baggage or cargo. The system is meant to be installed at the concourse or lobby ticketing areas of US commercial airports and uses a sealed radioactive source of californium-252 to irradiate baggage items. The major impact of the use of this system arises from direct exposure of the public to scattered or leakage radiation from the source and to induced radioactivity in baggage items. Under normal operation and the most likely accident scenarios, the environmental impacts that would be created by the proposed licensing action would not be significant. 44 refs., 19 figs., 18 tabs.

Jones, C.G.

1990-08-01T23:59:59.000Z

200

Energetic, exergetic, economic and environmental evaluations of geothermal district heating systems: An application  

Science Journals Connector (OSTI)

This study deals with an energetic and exergetic analysis as well as economic and environmental evaluations of Afyon geothermal district heating system (AGDHS) in Afyon, Turkey. In the analysis, actual system data are used to assess the district heating system performance, energy and exergy efficiencies, specific exergy index, exergetic improvement potential and exergy losses. And, for economic and environmental evaluations, actual data are obtained from the Technical Departments. The energy and exergy flow diagrams are clearly drawn to illustrate how much destructions/losses take place in addition to the inputs and outputs. For system performance analysis and improvement, both energy and exergy efficiencies of the overall AGDHS are determined to be 34.86% and 48.78%, respectively. The efficiency improvements in heat and power systems can help achieving energy security in an environmentally acceptable way by reducing the emissions that might otherwise occur. Present application has shown that in Turkey, geothermal energy is much cheaper than the other energy sources, like fossil fuels, and makes a significant contribution towards reducing the emissions of air pollution.

Ali Keçeba?

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Data:32b0abb8-a929-4537-b5ed-ab1155e4aa0b | Open Energy Information  

Open Energy Info (EERE)

abb8-a929-4537-b5ed-ab1155e4aa0b abb8-a929-4537-b5ed-ab1155e4aa0b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ameren Illinois Company Effective date: 2010/11/19 End date if known: Rate name: DS-3 and BGS-3 Zone 1 - General Delivery Service Above 100kV Sector: Industrial Description: Availability: Service under this Rate is available for any eligible Non-Residential Customer within the territory served by Company that has demand metering installed and a maximum monthly Demand equal to or greater than 150 kilowatts (kW) but less than 1,000 kW as qualified in the Delivery Service Rate Reassignment section.

202

Data:Cc27a182-9c18-459a-bb0c-cf017c083cd7 | Open Energy Information  

Open Energy Info (EERE)

7a182-9c18-459a-bb0c-cf017c083cd7 7a182-9c18-459a-bb0c-cf017c083cd7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Long Island Power Authority Effective date: 2012/03/05 End date if known: Rate name: D883 (Residential Water and Home Heating with Heat Pump) Sector: Residential Description: Applies to customers who use electricity for both water and space heating with an electric heat pump, with the exception of fireplaces and coal/wood burning stoves, and account must have been established after January 26, 1983. If your account is billed on a discounted Household Assistance Rate, the rate number is preceded by a "D" and the rate description will include "Household Assistance."

203

Data:8067abb5-b59d-4e51-acf4-9626fe3a05f3 | Open Energy Information  

Open Energy Info (EERE)

abb5-b59d-4e51-acf4-9626fe3a05f3 abb5-b59d-4e51-acf4-9626fe3a05f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Medford, Wisconsin (Utility Company) Effective date: 1997/06/27 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service between 200kW and 1,000kW Demand 9am-9pm Transformer Ownership Discount Sector: Industrial Description: This rate will be applied to customers for all types of service if their monthly maximum demand is in excess of 200kW but not greater than 1,000kW for 3 months in a consecutive 12-month period. Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0351 per kilowatt-hour.

204

Data:3d1fcecf-c3cf-4ea6-afa4-3107581abb92 | Open Energy Information  

Open Energy Info (EERE)

fcecf-c3cf-4ea6-afa4-3107581abb92 fcecf-c3cf-4ea6-afa4-3107581abb92 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland, Washington (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Schedule 70: Security Lighting Unmetered Residential - 250 Watt or less Sector: Lighting Description: A. Availability: In all territory served by the City's electric utility. B. Applicability: To all property owners or long-term leasees of property. C. Contract Provisions: The rates in this schedule apply to facilities consisting of overhead construction with mast arms and luminaries mounted on wood poles with lumen output as shown. Lighting facilities supplied under this schedule shall remain the property of the City, and shall be supplied only pursuant to a contract with the customer, the term of which shall be a period of not less than three (3) years.

205

Data:B53e1c4d-4abb-4d3e-ade2-8b6dbbdc091c | Open Energy Information  

Open Energy Info (EERE)

c4d-4abb-4d3e-ade2-8b6dbbdc091c c4d-4abb-4d3e-ade2-8b6dbbdc091c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stilwell, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Heavy Industrial-over 100,000 kWh Sector: Industrial Description: Cost + energy charge Source or reference: www.cityofstilwell.com/uploads/Ordinance_297__Water__Sewer__Electric_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

206

Data:54348949-b8a2-49ca-abb7-f9a4b6a2a526 | Open Energy Information  

Open Energy Info (EERE)

49-b8a2-49ca-abb7-f9a4b6a2a526 49-b8a2-49ca-abb7-f9a4b6a2a526 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wisconsin Rapids W W & L Comm Effective date: 2009/01/01 End date if known: Rate name: Small Power Service TOU Sector: Industrial Description: This rate will be available on an optional basis to customers for all types of service if their monthly Maximum Measured Demand is in excess of 50 kilowatts (kW) per month for three or more months in a consecutive 12-month period, but not greater than 200 kW per month for three or more months in a consecutive 12-month period. Fixed monthly charge: Customer Charge ($30.00) + Public Benefits Charge ($10.00).

207

Data:Bb1aec2f-1abb-47a7-a8ca-813778d17c3f | Open Energy Information  

Open Energy Info (EERE)

aec2f-1abb-47a7-a8ca-813778d17c3f aec2f-1abb-47a7-a8ca-813778d17c3f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Greenwood Commissioners-Pub Wk Effective date: 2008/09/01 End date if known: Rate name: Large Commercial service rate Sector: Commercial Description: MINIMUM CHARGE: The minimum monthly charge shall be the "Facility Charge". The following Tiered Demand Charge schedule is applied: First 30 kW of Billing Demand ................................... $1.890 Per kW. All Over 30 kW of Billing Demand ............................. $2.956 Per kW. DETERMINATION OF BILLING DEMAND: The "Billing Demand" for the billing period shall be the maximum integrated thirty minute demand recorded during the billing period for which the bill is rendered.

208

Data:573e8538-eef8-41ab-b576-32f3d13c0410 | Open Energy Information  

Open Energy Info (EERE)

e8538-eef8-41ab-b576-32f3d13c0410 e8538-eef8-41ab-b576-32f3d13c0410 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Clintonville, Wisconsin (Utility Company) Effective date: 2006/05/05 End date if known: Rate name: Gs-3 Large General Service Single Phase Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0680 per kWh. See schedule PCAC.

209

Data:7f0301ab-b8f6-442e-bb87-e115ff1332e8 | Open Energy Information  

Open Energy Info (EERE)

01ab-b8f6-442e-bb87-e115ff1332e8 01ab-b8f6-442e-bb87-e115ff1332e8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Burlington-Electric, Vermont (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Large General (LG) Rate Demand is less than 25KW- Net Metered Renewable Energy Source Rider Sector: Industrial Description: Service under this rate is supplied for all purposes where energy consumption is 3,000 kWh per month or above (or greater than or equal to 100 kWh per day) for 3 consecutive months out of the last 12 months, or at the request of the customer.

210

Data:6d4bc9cb-70c2-49ab-b9b8-2fe1caa35fcd | Open Energy Information  

Open Energy Info (EERE)

cb-70c2-49ab-b9b8-2fe1caa35fcd cb-70c2-49ab-b9b8-2fe1caa35fcd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Arrowhead Electric Coop, Inc Effective date: 2012/07/17 End date if known: Rate name: Off Peak Water Storage Sector: Description: This rate is applicable for customers who have General Service. Usage under this rate would be tracked by a 2nd meter. Source or reference: Illinois State University Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

211

Data:163a78c3-da63-485a-bb8c-64aa1836b3a5 | Open Energy Information  

Open Energy Info (EERE)

c3-da63-485a-bb8c-64aa1836b3a5 c3-da63-485a-bb8c-64aa1836b3a5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Holyoke, Massachusetts (Utility Company) Effective date: 2009/08/12 End date if known: Rate name: GENERAL SERVICE ELECTRIC SCHEDULE (RESIDENTIAL) Sector: Residential Description: Additional Info: Following rate(s) apply: First 200 Hrs. Times Demand First 3,000 kWh at .1181 per kWh Next 12,000 kWh at .1096 per kWh Next 85,000 kWh at .1033 per kWh All over 100,000 kWh at .0949 per kWh Next 200 Hrs. Times Demand (100 KW Minimum) at .0878 per kWh All over 400 Hrs. Times Demand (100 KW Minimum) at .0728 per kWh

212

Data:Db114796-1f6d-41ab-b6ab-d623cfdc55f1 | Open Energy Information  

Open Energy Info (EERE)

Db114796-1f6d-41ab-b6ab-d623cfdc55f1 Db114796-1f6d-41ab-b6ab-d623cfdc55f1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Edgecombe-Martin County E M C Effective date: 2006/08/01 End date if known: Rate name: SUBDIVISION STREET LIGHTING SCHEDULE HPS 250 W 4 Lots Sector: Lighting Description: 4 lots per light Type: HPS 250 W AVAILABILITY: Available in all territory served by the Cooperative, subject to the Cooperative's established Service Rules and Regulations. This is an experimental rate. Participation is limited to four developments during the first year trial period. APPLICABILITY: This schedule is applicable for lighting of residential streets within residential subdivisions. Applicability is limited to residential subdivisions consisting of single family dwellings where permanent electric facilities have been installed, located outside of the corporate limits of a city or town where installations are not prevented or regulated by any governmental unit having jurisdiction.

213

Data:52d743f4-7dd5-4b20-89fb-4abb6a8707b7 | Open Energy Information  

Open Energy Info (EERE)

3f4-7dd5-4b20-89fb-4abb6a8707b7 3f4-7dd5-4b20-89fb-4abb6a8707b7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Etna Green, Indiana (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Muncipal Service - Non Metered Demand- Single Phase Sector: Commercial Description: Source or reference: http://www.timesuniononline.com/print.asp?ArticleID=50294&SectionID=52&SubSectionID=277 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

214

Data:9b14761f-2df2-4086-abb3-3bc8175617e2 | Open Energy Information  

Open Energy Info (EERE)

f-2df2-4086-abb3-3bc8175617e2 f-2df2-4086-abb3-3bc8175617e2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Medford, Wisconsin (Utility Company) Effective date: 1997/06/20 End date if known: Rate name: Gs-2 Residential Three Phase Optional Time-of-Day Service 9am-9pm with Parallel Generation(20kW or less) Sector: Residential Description: This rate schedule is optional to all Residential Service, Rg-1 and General Service Gs-1, customers. Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0351 per kilowatt-hour.

215

Data:0b575fce-53a1-4de3-abb8-30f70dd92b14 | Open Energy Information  

Open Energy Info (EERE)

fce-53a1-4de3-abb8-30f70dd92b14 fce-53a1-4de3-abb8-30f70dd92b14 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2012/10/11 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL - HPS 100W Sector: Lighting Description: Source or reference: www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory PDFs/psco_elec_entire_tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

216

Data:Abb22900-14f1-4c75-8bf8-368dc0b56aca | Open Energy Information  

Open Energy Info (EERE)

Abb22900-14f1-4c75-8bf8-368dc0b56aca Abb22900-14f1-4c75-8bf8-368dc0b56aca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kiel, Wisconsin (Utility Company) Effective date: 2011/05/06 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 40kW and 200kW Demand Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0754 per kilowatt-hour.

217

Data:F26095e8-2e52-4a9a-bb85-f800157599ff | Open Energy Information  

Open Energy Info (EERE)

6095e8-2e52-4a9a-bb85-f800157599ff 6095e8-2e52-4a9a-bb85-f800157599ff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Morganton, North Carolina (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Large Commercial Service Sector: Commercial Description: Non Residential Customer/ 150-500 kW Minimum Demand 150 kW Demand Charges: Summer Demand Charge: $20.00/kW Summer Excess Demand: $5.00/kW Non-Summer Demand Charge: $10.50/kW Non-Summer Excess Demand: $8.00/kW Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/212/Morganton%20NC.pdf

218

Data:B0080cae-71ef-40ab-b122-e700eaf82bd9 | Open Energy Information  

Open Energy Info (EERE)

cae-71ef-40ab-b122-e700eaf82bd9 cae-71ef-40ab-b122-e700eaf82bd9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Halifax Electric Member Corp Effective date: 2012/10/01 End date if known: Rate name: SECURITY LIGHTING 400-watt high-pressure sodium Sector: Lighting Description: AVAILABILITY: This Schedule is available in all territory served by the Cooperative, subject to its established Service Rules and Regulations. APPLICABILITY: This Schedule is applicable to any consumer served by the Cooperative ADJUSTMENT RIDERS AND TAXES: The Cooperative's approved Wholesale Power and TIER Adjustment, as well as the current North Carolina State Sales Tax, shall be applicable to all service supplied under this Schedule. Each lamp, since its power supply is un-metered, shall have a monthly estimated usage assigned for billing purposes as follows: 400-watt high-pressure sodium lamp - 160 kWh per month

219

Data:3c49000a-f0aa-410f-aa9b-41c4c5c68abb | Open Energy Information  

Open Energy Info (EERE)

9000a-f0aa-410f-aa9b-41c4c5c68abb 9000a-f0aa-410f-aa9b-41c4c5c68abb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bonners Ferry, Idaho (Utility Company) Effective date: 2009/10/01 End date if known: Rate name: Self Consumed with Demand: B1PO Sector: Industrial Description: Note: $10.00 added to Fixed monthly charge if Remote Read Device is used. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

220

Data:1daa5b81-96aa-4f0a-9abb-2e254c8cd2ba | Open Energy Information  

Open Energy Info (EERE)

b81-96aa-4f0a-9abb-2e254c8cd2ba b81-96aa-4f0a-9abb-2e254c8cd2ba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Ohio (Utility Company) Effective date: End date if known: Rate name: Street Lighting ornamental, 700w mv(E and M), 30 ft steel pole Sector: Lighting Description: street lighting,ornamental mercury vapor 700 watt(E and M) with maximum 280kwh per lamp. Source or reference: http://www.cpp.org/CPP%20RRR%20ORDINANCE%20as%20of%2011-14-06.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Data:7593ae0c-a1fd-4b7a-86ab-b37a292d8c6d | Open Energy Information  

Open Energy Info (EERE)

ae0c-a1fd-4b7a-86ab-b37a292d8c6d ae0c-a1fd-4b7a-86ab-b37a292d8c6d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Indiana Pub Serv Co Effective date: 2011/12/27 End date if known: Rate name: Metal Melting Service Sector: Industrial Description: TO WHOM AVAILABLE This is a rate for customers who have substantial requirement for electric metal melting and/or holding equipment. Total capacity to be made available under this rate is limited to 100 Megawatts. This Rate Schedule is available to Industrial Customers with electric metal melting and/or holding equipment and an on-peak demand that is less than 50% of the off-peak period and is located adjacent to existing electric facilities adequate to meet the Customer's requirements. A Customer requesting service hereunder is required to contract for a specific amount of electrical capacity which shall be not less than 500 kilowatts. The Company shall not supply demand in excess of 12,000 kilowatts under this schedule. The Company shall not be obligated to supply capacity in excess of that specified in the contract.

222

Data:Adae2e5a-c205-4ed9-abb9-0fd35eb235a6 | Open Energy Information  

Open Energy Info (EERE)

Adae2e5a-c205-4ed9-abb9-0fd35eb235a6 Adae2e5a-c205-4ed9-abb9-0fd35eb235a6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Williams - AZ, Arizona (Utility Company) Effective date: End date if known: Rate name: Residential Service (E 12) Sector: Description: Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

223

Data:9722a682-f269-48ab-b5db-beea974da782 | Open Energy Information  

Open Energy Info (EERE)

82-f269-48ab-b5db-beea974da782 82-f269-48ab-b5db-beea974da782 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeastern Indiana R E M C Effective date: 2010/05/01 End date if known: Rate name: SECURITY LIGHTING SERVICES: 100W Metal Halide Sector: Lighting Description: Dusk till Dawn Lighting Service Source or reference: http://www.seiremc.com/2006/rate_sch/2010/SLSecurityLightingService-5-1-10.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

224

Data:30a552c6-df41-422a-bb1a-fe4cc6f769c0 | Open Energy Information  

Open Energy Info (EERE)

c6-df41-422a-bb1a-fe4cc6f769c0 c6-df41-422a-bb1a-fe4cc6f769c0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Ohio (Utility Company) Effective date: End date if known: Rate name: Large Industrial Rate Schedule Sector: Industrial Description: Source or reference: http://www.cpp.org/CPP%20RRR%20ORDINANCE%20as%20of%2011-14-06.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

225

Environmental and economic analysis of building integrated photovoltaic systems in Italian regions  

Science Journals Connector (OSTI)

Abstract Solar energy is a form of renewable energy that can be used to combat climate change through an environmentally accepted energy supply policy with support from both private and public consumers. There are numerous factors contributing to the definition of the economic and environmental performance of solar energy investments, such as average annual irradiation, consumers' consumption, Feed in Tariff incentive system, energy portfolio, emissions produced by the photovoltaic system, rated power of the individual modules, disposable income of the investor, availability of surface for the installation of the photovoltaic panels and mission, that characterise the project (environmental maximisation, economic maximisation or self-sufficiency of the system during the first year). Given the particular geographical position of Italy, the economic profitability and environmental impact of such system were estimated, first on the provincial scale and then on the regional scale, to delineate the general characteristics that are not caused by a single scenario. The indicators used include the following: net present value (NPV), internal rate of return (IRR), discounted payback period (DPbP), discounted aggregate cost-benefit ratio (BCr) and reduction of emissions of carbon dioxide (ERcd). The ultimate objective of the paper is to define the number of photovoltaic (PV) systems necessary to reach the target of renewable energy production in the above settings. A general scenario appropriate to achieve this goal, as well as implementing the total wealth generated by this framework and the reduction of CO2 emissions resulting from the implementation of that plan, will be examined. The indicators used are total net present value per capita and reduction of carbon dioxide emissions per capita.

Federica Cucchiella; Idiano D'Adamo; S.C. Lenny Koh

2013-01-01T23:59:59.000Z

226

24.01.01.V1.13 ENVIRONMENTAL HEALTH AND SAFETY Supplements System Policy 24.01 and System Regulation 24.01.01  

E-Print Network (OSTI)

committee; H. Promote work practices that ensure the safety of persons and the preservation of state24.01.01.V1.13 ENVIRONMENTAL HEALTH AND SAFETY PROGRAMS Supplements System Policy 24.01 and System to the development and maintenance of health, safety, and environmental management programs. Safety is the business

227

Techno-economic and environmental risk analysis for advanced marine propulsion systems  

Science Journals Connector (OSTI)

A Techno-economic, Environmental and Risk Analysis (TERA) computational method has been developed for marine propulsion systems. The method comprises several numerical models which simulate the life cycle operation of marine gas turbines installed on marine vessels. Using a system-of-systems approach, the effect of operational profile can be taken into consideration in the assessment of a novel prime mover. Stochastic estimates of the powerplant’s life cycle net present cost are generated. The ship performance model plays a central role in the TERA method. This is an integrated virtual marine vessel operating environment that allows the calculation of engine performance and exhaust emissions (nitric oxide (NOx), carbon monoxide CO, carbon dioxide (CO2) and unburned hydrocarbon (UHC)) for a given trip. The life of the gas turbine is assessed through a creep-life prediction method, which plays a significant role on the maintenance cost calculation in the economic model. The economic model predicts net present cost over the operating life of the vessel using stochastic analysis of the earning capacity of the ship powered by the chosen prime mover. The TERA simulation of a 25 MW marine gas turbine powering a RoPax fast ferry in an integrated full electric propulsion system is presented as an illustration of the method. The example includes aspects of the systemic analysis of engine and ship performance, accompanied by environmental effect and engine life prediction, coupled with an economic feasibility stochastic study of the selected propulsion system under several journey and economic scenarios.

G. Doulgeris; T. Korakianitis; P. Pilidis; E. Tsoudis

2012-01-01T23:59:59.000Z

228

Environmental Restoration Program quality system requirements for the Hanford Site. Revision 2  

SciTech Connect

This document defines the quality system requirements for the US Department of Energy, Richland Operations Office, Environmental Restoration Program at the Hanford Site. The Quality System Requirements (OSR) for the Hanford Site integrates quality assurance requirements from the US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), and applicable industry standards into a single source document for the development of quality systems applicable to the Environmental Restoration Program activities. This document, based on fifteen criteria and divided intro three parts, provides user organizations with the flexibility to incorporate only those criteria and parts applicable to their specific scopes of work. The requirements of this document shall be applied to activities that affect quality based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities in terms of meeting ER Program objectives and customer expectations. The individual quality systems developed in accordance with this document are intended to provide an integrated management control system that assures the conduct of ER Program activities in a manner that protects human health and the environment.

Cote, R.F.

1993-11-01T23:59:59.000Z

229

Potential use of feebate systems to foster environmentally sound urban waste management  

SciTech Connect

Waste treatment facilities are often shared among different municipalities as a means of managing wastes more efficiently. Usually, management costs are assigned to each municipality depending on the size of the population or total amount of waste produced, regardless of important environmental aspects such as per capita waste generation or achievements in composting or recycling. This paper presents a feebate (fee+rebate) system aimed to foster urban waste reduction and recovery. The proposal suggests that municipalities achieving better results in their waste management performance (from an ecological viewpoint) be recompensated with a rebate obtained from a fee charged to those municipalities that are less environmentally sound. This is a dynamic and flexible instrument that would positively encourage municipalities to reduce waste whilst increasing the recycling.

Puig-Ventosa, Ignasi

2004-07-01T23:59:59.000Z

230

Modeling of integrated environmental control systems for coal-fired power plants  

SciTech Connect

The Integrated Environmental Control Model (IECM) was designed to permit the systematic evaluation of environmental control options for pulverized coal-fired (PC) power plants. Of special interest was the ability to compare the performance and cost of advanced pollution control systems to conventional'' technologies for the control of particulate, SO{sub 2} and NO{sub x}. Of importance also was the ability to consider pre-combustion, combustion and post-combustion control methods employed alone or in combination to meet tough air pollution emission standards. Finally, the ability to conduct probabilistic analyses is a unique capability of the IECM. Key results are characterized as distribution functions rather than as single deterministic values. (VC)

Rubin, E.S.; Salmento, J.S.; Frey, H.C.; Abu-Baker, A.; Berkenpas, M.

1991-05-01T23:59:59.000Z

231

Modeling of integrated environmental control systems for coal-fired power plants. Final report  

SciTech Connect

The Integrated Environmental Control Model (IECM) was designed to permit the systematic evaluation of environmental control options for pulverized coal-fired (PC) power plants. Of special interest was the ability to compare the performance and cost of advanced pollution control systems to ``conventional`` technologies for the control of particulate, SO{sub 2} and NO{sub x}. Of importance also was the ability to consider pre-combustion, combustion and post-combustion control methods employed alone or in combination to meet tough air pollution emission standards. Finally, the ability to conduct probabilistic analyses is a unique capability of the IECM. Key results are characterized as distribution functions rather than as single deterministic values. (VC)

Rubin, E.S.; Salmento, J.S.; Frey, H.C.; Abu-Baker, A.; Berkenpas, M.

1991-05-01T23:59:59.000Z

232

Establishment of an Environmental Control Technology Laboratory with a Circulating Fluidized-Bed Combustion System  

SciTech Connect

This report is to present the progress made on the project ''Establishment of an Environmental Control Technology Laboratory (ECTL) with a Circulating Fluidized-Bed Combustion (CFBC) System'' during the period January 1, 2006 through March 31, 2006. Work was performed on the following activities. First, the fabrication and manufacture of the CFBC Facility were completed. The riser, primary cyclone and secondary cyclone of Circulating Fluidized Bed (CFB) Combustor have been erected. Second, the Mercury Control Workshop and the Grand Opening of Institute for Combustion Science and Environmental Technology (ICSET) were successfully held on February 22 and 23, 2006, respectively. Third, effects of hydrogen chlorine (HCl) and sulfur dioxide (SO{sub 2}) on mercury oxidation were studied in a drop tube reactor. The experimental results from this study are presented in this report. Finally, the proposed work for the next quarter is described in this report.

Wei-Ping Pan; Yan Cao; Songgeng Li

2006-04-01T23:59:59.000Z

233

Columbia River System Operation Review : Final Environmental Impact Statement, Appendix N: Wildlife.  

SciTech Connect

The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included.

Columbia River System Operation Review (U.S.)

1995-11-01T23:59:59.000Z

234

Eco-operation of co-generation systems optimized by environmental load value  

SciTech Connect

In this paper the authors introduce a life cycle assessment scheme with the aid of the environmental load value (ELV) as a numerical measure to estimate the quantitative load of any industrial activity on the environment. The value is calculated from the total summation of the respective environmental load indexes through the life cycle activity from cradle to grave. An algorithm and a software using a combined simplex and branch-bound technique are accomplished to give the numerical ELV and its optimization. This ELV scheme is applied to co-generation energy systems consisting of gas turbines, waste-heat boilers, auxiliary boilers, steam turbines, electricity operated turbo refrigerators, steam absorption refrigerators and heat exchangers, which can be easily set up on the computer display in an ICON and Q and A style, including various kinds of parameters. The two kinds of environmental loads respecting the fossil fuel depletion and the CO{sub 2} global warming due to electricity generation from power stations in Japan are chosen as the ELV criterion. The ELV optimization is calculated corresponding to the hourly energy demands for electricity, air cooling, air heating, and hot water from a district consisting eight office buildings and four hotels. As a result, the ELV scheme constructed here is found to be an attractive and powerful tool to quantitatively estimate the LCA environmental loads of any industrial activity like co-generation energy systems and to propose the eco-operation of the industrial activity of interest. The cost estimation can be made as well.

Kato, Seizo; Nomura, Nobukazu; Maruyama, Naoki

1998-07-01T23:59:59.000Z

235

Hanford Environmental Information System (HEIS). Volume 1, User`s guide  

SciTech Connect

The Hanford Environmental Information System (HEIS) is a consolidated set of automated resources that effectively manage the data gathered during environmental monitoring and restoration of the Hanford Site. HEIS includes an integrated database that provides consistent and current data to all users and promotes sharing of data by the entire user community. HEIS is an information system with an inclusive database. Although the database is the nucleus of the system, HEIS also provides user access software: query-by-form data entry, extraction, and browsing facilities; menu-driven reporting facilities; an ad hoc query facility; and a geographic information system (GIS). These features, with the exception of the GIS, are described in this manual set. Because HEIS contains data from the entire Hanford Site, many varieties of data are included and have.been divided into subject areas. Related subject areas comprise several volumes of the manual set. The manual set includes a data dictionary that lists all of the fields in the HEIS database, with their definitions and a cross reference of their locations in the database; definitions of data qualifiers for analytical results; and a mapping between the HEIS software functions and the keyboard keys for each of the supported terminals or terminal emulators.

Not Available

1994-01-14T23:59:59.000Z

236

High fidelity nuclear energy system optimization towards an environmentally benign, sustainable, and secure energy source.  

SciTech Connect

The impact associated with energy generation and utilization is immeasurable due to the immense, widespread, and myriad effects it has on the world and its inhabitants. The polar extremes are demonstrated on the one hand, by the high quality of life enjoyed by individuals with access to abundant reliable energy sources, and on the other hand by the global-scale environmental degradation attributed to the affects of energy production and use. Thus, nations strive to increase their energy generation, but are faced with the challenge of doing so with a minimal impact on the environment and in a manner that is self-reliant. Consequently, a revival of interest in nuclear energy has followed, with much focus placed on technologies for transmuting nuclear spent fuel. The performed research investigates nuclear energy systems that optimize the destruction of nuclear waste. In the context of this effort, nuclear energy system is defined as a configuration of nuclear reactors and corresponding fuel cycle components. The proposed system has unique characteristics that set it apart from other systems. Most notably the dedicated High-Energy External Source Transmuter (HEST), which is envisioned as an advanced incinerator used in combination with thermal reactors. The system is configured for examining environmentally benign fuel cycle options by focusing on minimization or elimination of high level waste inventories. Detailed high-fidelity exact-geometry models were developed for representative reactor configurations. They were used in preliminary calculations with Monte Carlo N-Particle eXtented (MCNPX) and Standardized Computer Analysis for Licensing Evaluation (SCALE) code systems. The reactor models have been benchmarked against existing experimental data and design data. Simulink{reg_sign}, an extension of MATLAB{reg_sign}, is envisioned as the interface environment for constructing the nuclear energy system model by linking the individual reactor and fuel component sub-models for overall analysis of the system. It also provides control over key user input parameters and the ability to effectively consolidate vital output results for uncertainty/sensitivity analysis and optimization procedures. The preliminary analysis has shown promising advanced fuel cycle scenarios that include Pressure Water Reactors Pressurized Water Reactors (PWRs), Very High Temperature Reactors (VHTRs) and dedicated HEST waste incineration facilities. If deployed, these scenarios may substantially reduce nuclear waste inventories approaching environmentally benign nuclear energy system characteristics. Additionally, a spent fuel database of the isotopic compositions for multiple design and control parameters has been created for the VHTR-HEST input fuel streams. Computational approaches, analysis metrics, and benchmark strategies have been established for future detailed studies.

Tsvetkov, Pavel Valeryevich (Texas A& M University, College Station, TX); Rodriguez, Salvador B.; Ames, David E., II (Texas A& M University, College Station, TX); Rochau, Gary Eugene

2009-09-01T23:59:59.000Z

237

Data:7c1af265-7ea3-48f7-b808-e02673a0abb1 | Open Energy Information  

Open Energy Info (EERE)

af265-7ea3-48f7-b808-e02673a0abb1 af265-7ea3-48f7-b808-e02673a0abb1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jacksonville Electric Authority Effective date: 2011/10/01 End date if known: Rate name: CS Curtailable Service Rider Option A Primary Service Discount Sector: Description: For service taken at 4160 - 69000 volts, when the customer provides all the equipment required to take service at JEA's existing primary lines. To customers eligible for Rate Schedules SS or GSLD who have executed a Curtailable Service Agreement with JEA. The customer agrees during a period of requested curtailment to curtail a minimum load of 200 kW. All service hereunder will be rendered through a single metering installation. Resale of energy purchased under this rider is not permitted. JEA reserves the right to limit the total load served under this rider. Curtailable service under this rate schedule is subject to curtailment during any time period that electric power and energy delivered hereunder from JEA's available generating resources is required to a) maintain service to JEA's firm power customers and firm power sales commitments, or b) supply emergency interchange service to another utility for its firm load obligations only, and c) when the price of power available to JEA from other sources exceeds 30 cents per kWh. The following charges are applicable to the curtailable portion of the customer's load only. The kW demand and kWh consumption not exceeding the Contracted Non-Curtailable demand shall be billed according to the terms and conditions of the JEA's standard GSLD Rate Schedule.

238

Data:Ba2c55ad-e6d5-4f50-abb2-919e9511d0eb | Open Energy Information  

Open Energy Info (EERE)

c55ad-e6d5-4f50-abb2-919e9511d0eb c55ad-e6d5-4f50-abb2-919e9511d0eb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kankakee Valley Rural E M C Effective date: 2012/05/01 End date if known: Rate name: Rate Schedule OSL: Ornamental Street Lighting Service 175 watt MV Sector: Lighting Description: AVAILABILITY: Available to any Property Owner's Association (P.O.A.) served by the REMC with continuous, year-round service for outdoor lighting where 120 volt service exists ahead of the meter loop. CHARACTER OF SERVICE: Only power service is available under this schedule. Power service is for lighting service where the REMC supplies only un-metered capacity and energy required for area lighting service. The developer or property owners' association is responsible for the installation, operation and maintenance of the lighting equipment. Any additional investment required by the extension of secondary lines, or hanging of a transformer, or installation of additional poles for the sole purpose of this service, will require a contribution by the P.O.A. The lighting equipment remains the property of the developer or property owners' association and the REMC will not be responsible for any costs of operating and maintaining such equipment.

239

Data:4e7dac5c-83ee-4c1c-abb8-132ccadd6501 | Open Energy Information  

Open Energy Info (EERE)

dac5c-83ee-4c1c-abb8-132ccadd6501 dac5c-83ee-4c1c-abb8-132ccadd6501 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Cowlitz County Effective date: 2012/04/01 End date if known: Rate name: RESIDENTIAL SERVICE SCHEDULE DDR-2 Three Phase Sector: Residential Description: Applicable to all domestic uses in single-family residences, individual apartments or small farms, supplied through a single meter and one Point of Delivery; provided that equipment and installations for space and water heating shall be subject to approval of the District. BASIC REQUIREMENTS 1. The Customer must occupy the subject premises and have been signed for service as a Cowlitz PUD residential electric customer for not less than the past 12 consecutive months. 2. The Customer must provide proof of a disability: * Qualify for special parking privileges under RCW 46.16.381(1) (a through h) or are a blind person as defined in RCW 74.18.020(4), or * Earn an SSDI income, or * Provide a physician's certification that they are disabled, handicapped, or an incapacitated person as defined under RCW 71A.10.020 (3) or any other existing state or federal program. 3. Annual gross household income is: Persons in Household Gross Household Income 1 - 2 $14,710 - $22,065 3 $18,530 - $27,795 4 $22,350 - $33,525 5+ $26,170 - $39,255 4. The Customer must meet the requirements listed in the Low-Income Disabled Citizen Discounted Rate Eligibility Guidelines, as required by the District.

240

Establishment of an Environmental Control Technology Laboratory with a Circulating Fluidized-Bed Combustion System  

SciTech Connect

On February 14, 2002, President Bush announced the Clear Skies Initiative, a legislative proposal to control the emissions of nitrogen oxides (NO{sub x}), sulfur dioxide (SO{sub 2}), and mercury from power plants. In response to this initiative, the National Energy Technology Laboratory organized a Combustion Technology University Alliance and hosted a Solid Fuel Combustion Technology Alliance Workshop. The workshop identified multi-pollutant control; improved sorbents and catalysts; mercury monitoring and capture; and improved understanding of the underlying reaction chemistry occurring during combustion as the most pressing research needs related to controlling environmental emissions from fossil-fueled power plants. The Environmental Control Technology Laboratory will help meet these challenges and offer solutions for problems associated with emissions from fossil-fueled power plants. The goal of this project was to develop the capability and technology database needed to support municipal, regional, and national electric power generating facilities to improve the efficiency of operation and solve operational and environmental problems. In order to effectively provide the scientific data and the methodologies required to address these issues, the project included the following aspects: (1) Establishing an Environmental Control Technology Laboratory using a laboratory-scale, simulated fluidized-bed combustion (FBC) system; (2) Designing, constructing, and operating a bench-scale (0.6 MW{sub th}), circulating fluidized-bed combustion (CFBC) system as the main component of the Environmental Control Technology Laboratory; (3) Developing a combustion technology for co-firing municipal solid waste (MSW), agricultural waste, and refuse-derived fuel (RDF) with high sulfur coals; (4) Developing a control strategy for gaseous emissions, including NO{sub x}, SO{sub 2}, organic compounds, and heavy metals; and (5) Developing new mercury capturing sorbents and new particulate filtration technologies. Major tasks during this period of the funded project's timeframe included: (1) Conducting pretests on a laboratory-scale simulated FBC system; (2) Completing detailed design of the bench-scale CFBC system; (3) Contracting potential bidders to fabricate of the component parts of CFBC system; (4) Assembling CFBC parts and integrating system; (5) Resolving problems identified during pretests; (6) Testing with available Powder River Basin (PRB) coal and co-firing of PRB coal with first wood pallet and then chicken wastes; and (7) Tuning of CFBC load. Following construction system and start-up of this 0.6 MW CFBC system, a variety of combustion tests using a wide range of fuels (high-sulfur coals, low-rank coals, MSW, agricultural waste, and RDF) under varying conditions were performed to analyze and monitor air pollutant emissions. Data for atmospheric pollutants and the methodologies required to reduce pollutant emissions were provided. Integration with a selective catalytic reduction (SCR) slipstream unit did mimic the effect of flue gas composition, including trace metals, on the performance of the SCR catalyst to be investigated. In addition, the following activities were also conducted: (1) Developed advanced mercury oxidant and adsorption additives; (2) Performed laboratory-scale tests on oxygen-fuel combustion and chemical looping combustion; and (3) Conducted statistical analysis of mercury emissions in a full-scale CFBC system.

Wei-Ping Pan; Yan Cao; John Smith

2008-05-31T23:59:59.000Z

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Spectroscopic Approaches for Phosphorus Speciation in Soils and other Environmental Systems  

SciTech Connect

In the past decades, environmental scientists have become increasingly involved in developing novel approaches for applying emerging spectroscopic techniques to complex environmental matrices. The objective of this review is to convey the most common chemical species of phosphorus reported for soils, sediments, model systems, and waste materials based on analyses by four spectroscopic techniques: X-ray absorption near-edge structure, nuclear magnetic resonance, Fourier transform infrared spectroscopy, and Raman spectroscopy. Unique information is provided by each technique at a level of specificity that depends in part on matrix complexity. The X-ray absorption near-edge structure and nuclear magnetic resonance techniques reveal inorganic and organic P species in intact environmental matrices or in chemical extracts, whereas the Fourier transform infrared and Raman techniques can provide more specific bonding information about mineral or adsorbed P species in model analogs of matrix components. The most common P species in soils and sediments as indicated by spectroscopy are hydroxyapatite and octacalcium phosphate minerals, phosphate adsorbed on Fe- and Al-oxides, pyrophosphates and polyphosphates, phosphate mono- and di-esters, and phosphonates. Continued advancements in spectroscopic methods should improve speciation-based models of P mobilization and transformations in the environment.

F Kizewski; A Morris; Y Liu; D Hesterberg

2011-12-31T23:59:59.000Z

242

Data management plan for the Oak Ridge Environmental Information System, Version 1. 1  

SciTech Connect

The Data Management Plan (DMP) describes the data management objectives, system components, data base structure and contents, system maintenance, data processing, and user interface for the prototype phase of the Oak Ridge Environmental Information System (OREIS). The major goals of OREIS data management are to compile data of known quality, to maintain the integrity of the data base, and to provide data to users. The DMP defines the requirements, describes the responsibilities, and references the procedures for meeting the data management objectives. Emphasis is on management of measurement data and the associated metadata used to support its proper interpretation and legal defensibility. The DMP covers transmittal, processing, storage, and data access activities associated with OREIS. The OREIS data dictionary is provided as an appendix.

Not Available

1992-08-04T23:59:59.000Z

243

Role for a geographical information system in a large environmental project  

SciTech Connect

A geographical information system (GIS) has proved to be a valuable tool in the Direct/Delayed Response Project - a comprehensive examination of the future, long-term chemical response of surface waters to acidic deposition. The role of the GIS within the project includes aggregation, analysis and display of various forms, scales and projections of environmental data related to acidic deposition. The GIS is particularly valuable for effectively communicating key scientific findings and results of regional, national and international importance to adverse audience.

Campbell, W.G.; Church, M.R.; Bishop, G.D.; Mortenson, D.C.; Pierson, S.M.

1989-01-01T23:59:59.000Z

244

Energy and complex industrial systems environmental emissions data reporting and acquisition  

SciTech Connect

The Joint International Atomic Energy Agency (IAEA), UNEP and WHO Project on Assessing and Managing Health and Environmental risks from Energy and Other Complex Technologies intends to complile emissions data for mportant energy systems and other complex technologies from a wide variety of countries. To facilitate data generation and compilation, this report: outlines data reporting protocols; identifies potential information sources; demonstrates how to estimate coefficients; presents some compiled US emission coefficients or criteria air pollutants for some energy process; and, compares national air emission standards for electricity generating plants in OECD member countries. 27 refs., 2 fis., 1 tabs.

Moskowitz, P.D.; Hamilton, L.D.

1987-07-01T23:59:59.000Z

245

Design of an Unattended Environmental Aerosol Sampling and Analysis System for Gaseous Centrifuge Enrichment Plants  

SciTech Connect

The resources of the IAEA continue to be challenged by the rapid, worldwide expansion of nuclear energy production. Gaseous centrifuge enrichment plants (GCEPs) represent an especially formidable dilemma to the application of safeguard measures, as the size and enrichment capacity of GCEPs continue to escalate. During the early part of the 1990's, the IAEA began to lay the foundation to strengthen and make cost-effective its future safeguard regime. Measures under Part II of 'Programme 93+2' specifically sanctioned access to nuclear fuel production facilities and environmental sampling by IAEA inspectors. Today, the Additional Protocol grants inspection and environmental sample collection authority to IAEA inspectors at GCEPs during announced and low frequency unannounced (LFUA) inspections. During inspections, IAEA inspectors collect environmental swipe samples that are then shipped offsite to an analytical laboratory for enrichment assay. This approach has proven to be an effective deterrence to GCEP misuse, but this method has never achieved the timeliness of detection goals set forth by IAEA. Furthermore it is questionable whether the IAEA will have the resources to even maintain pace with the expansive production capacity of the modern GCEP, let alone improve the timeliness in reaching current safeguards conclusions. New safeguards propositions, outside of familiar mainstream safeguard measures, may therefore be required that counteract the changing landscape of nuclear energy fuel production. A new concept is proposed that offers rapid, cost effective GCEP misuse detection, without increasing LFUA inspection access or introducing intrusive access demands on GCEP operations. Our approach is based on continuous onsite aerosol collection and laser enrichment analysis. This approach mitigates many of the constraints imposed by the LFUA protocol, reduces the demand for onsite sample collection and offsite analysis, and overcomes current limitations associated with the in-facility misuse detection devices. Onsite environmental sample collection offers the ability to collect fleeting uranium hexafluoride emissions before they are lost to the ventilation system or before they disperse throughout the facility, to become deposited onto surfaces that are contaminated with background and historical production material. Onsite aerosol sample collection, combined with enrichment analysis, provides the unique ability to quickly detect stepwise enrichment level changes within the facility, leading to a significant strengthening of facility misuse deterence. We report in this paper our study of several GCEP environmental sample release scenarios and simulation results of a newly designed aerosol collection and particle capture system that is fully integrated with the Laser Ablation, Absorbance Ratio Spectrometry (LAARS) uranium particle enrichment analysis instrument that was developed at the Pacific Northwest National Laboratory.

Anheier, Norman C.; Munley, John T.; Alexander, M. L.

2011-07-19T23:59:59.000Z

246

Environmental Policy and Assistance  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Protection, Sustainability Support & Corporate Safety Analysis HS-20 Home Mission & Functions » Office of Nuclear Safety, Quality Assurance & Environment » Sustainability Support » Environmental Policy & Assistance » Corporate Safety Programs » Analysis Program Contacts What's New? Sustainability Support Environment Corporate Safety Programs Analysis Environment Environmental Policy Environmental Guidance Environmental Reports Environmental Management System Radiation Protection Environmental Compliance Environmental Justice Environmental Training Environmental Tools Search Our Documents Topics & Resources Air Analytical Services Program CERCLA Cultural & Natural Resources DOE Comments on Rulemakings Federal Environmental Laws

247

Workshop on environmental assessment. [Regulation of applications of nuclear energy and related ancillary systems  

SciTech Connect

Objectives of the workshop were: to review and evaluate the state-of-the-art of environmental impact assessments as applied to the regulation of applications of nuclear energy and related ancillary systems; to identify areas where existing technology allows establishing acceptable methods or standard practices that will meet the requirements of the NRC regulations, standards and guides for both normal operations and off-standard conditions including accident considerations; to illuminate topics where existing models or analytical methods are deficient because of unverified assumptions, a paucity of empirical data, conflicting results reported in the literature or a need for observation of operation systems; to compile, analyze and synthesize a prioritized set of research needs to advance the state-of-the-art to the level which will meet all of the requirements of the Commission's regulations, standards and guides; and to develop bases for maintaining the core of regulatory guidance at the optimum level balancing technical capabilities with practical considerations of cost and value to the regulatory process. The discussion held in small group sessions on aquatic, atmospheric, and terrestrial pathways are presented. The following research needs were identified as common to all three groups: validation of models; characterization of source terms; development of screening techniques; basis for de minimis levels of contamination; and updating of objectives for environmental monitoring programs.

Watson, E.C. (comp.)

1982-07-01T23:59:59.000Z

248

Environmental performance of power generation system in China based on LCA  

Science Journals Connector (OSTI)

In this study LCA (life cycle assessment) is used as a tool for the assessment of energy consumption and associated impacts generated from utilization of energy in various power generation systems in China. The details follow the methodology outlined in ISO14040. The scope of this research includes energy production energy transportation and energy utilization. The function unit of life cycle inventory is 1 kJ electricity power. Most of the inventory data have been collected from Yearbook of China. Compared to fuel?fired power generation system hydropower and nuclear power are more environment?friendly according to life cycle inventory analysis results so increasing the proportion of hydropower and nuclear power in the power industry has a significant improvement effect on the development of China’s power industry. The life cycle environmental impact of integrated power generation level in 2010 will be 13.8% lower than in 1999 according to National energy policy of China.

Xing Su; Xu Zhang; Yuan Yuan

2010-01-01T23:59:59.000Z

249

ESTABLISHMENT OF AN ENVIRONMENTAL CONTROL TECHNOLOGY LABORATORY WITH A CIRCULATING FLUIDIZED-BED COMBUSTION SYSTEM  

SciTech Connect

This report is to present the progress made on the project ''Establishment of an Environmental Control Technology Laboratory (ECTL) with a Circulating Fluidized-Bed Combustion (CFBC) System'' during the period July 1, 2004 through September 30, 2004. The following tasks have been completed. First, renovation of the new Combustion Laboratory and the construction of the Circulating Fluidized-Bed (CFB) Combustor Building have started. Second, the design if the component parts of the CFBC system have been reviewed and finalized so that the drawings may be released to the manufacturers during the next quarter. Third, the experiments for solid waste (chicken litter) incineration have been conducted using a Thermogravimetric Analyzer (TGA). This is in preparation for testing in the simulated fluidized-bed combustor. The experimental results from this study are presented in this report. Finally, the proposed work for the next quarter has been outlined in this report.

Wei-Ping Pan; Andy Wu; John T. Riley

2004-10-30T23:59:59.000Z

250

Environmental Implications of Jatropha Biofuel from a Silvi-Pastoral Production System in Central-West Brazil  

Science Journals Connector (OSTI)

Environmental Implications of Jatropha Biofuel from a Silvi-Pastoral Production System in Central-West Brazil ... (8) Independent of debates over biofuels, agricultural intensification, particularly cattle production in the tropics, has been identified as a way to reduce negative LUC.(9, 10) This study examines the environmental impacts of a biofuel production system currently being implemented in the Central-Western Brazilian state of Mato Grosso do Sul, in which jatropha is intercropped with cattle pasture. ... The basic Jatropha biodiesel system consumes 8 times less non-renewable energy than conventional diesel and reduces greenhouse gas emissions 51%. ...

Rob Bailis; Goksin Kavlak

2013-05-28T23:59:59.000Z

251

This paper has been downloaded from the Building and Environmental Thermal Systems Research Group at Oklahoma State University  

E-Print Network (OSTI)

not describe well the energy performance of air-source heat pump systems operating in frosting conditions. Heat and Environmental Issues in Energy Systems 16 ­ 19 May, 2010, Sorrento, Italy I TRODUCTIO Heat pumps employed frost and defrost are transient phenomena, steady state models used by heat pump manufacturers do

252

Final Report-Confirmatory Survey Results for the ABB Combustion Engineering Site, Windsor, Connecticut; Revision 1 (DCN 5158-SR-02-1) (Docket No. 030-03754; RFTA No. 12-003)  

SciTech Connect

The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor?s procedures and FSS results. ORAU reviewed ABB CE?s decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys included gamma surface scans, gamma direct measurements, and soil sampling.

ADAMS, WADE C

2013-01-28T23:59:59.000Z

253

Environmental Protection Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Details Site Details EPD Home Staff List (pdf) Org Chart (pdf) Compliance / Permits Programs Other Information Land Use & Institutional Controls Mapping Site Environmental Reports Environmental Monitoring Plan (EMP) Spill Response BNL Site Index Can't View PDFs? Developing Environmental Products and Services for Brookhaven Stakeholders The Environmental Protection Division (EPD) develops and delivers environmental products and services for all Brookhaven stakeholders. We manage environmental programs such as pollution prevention, groundwater protection, and natural resource management; provide technical assistance on environmental requirements; maintain the Laboratory's IS0 14001-registered Environmental Management System; prepare environmental permit applications; conduct environmental monitoring; manage data

254

Establishment of an Environmental Control Technology Laboratory with a Circulating Fluidized-Bed Combustion System  

NLE Websites -- All DOE Office Websites (Extended Search)

EstablishmEnt EstablishmEnt of an EnvironmEntal Control tEChnology laboratory with a CirCulating fluidizEd-bEd Combustion systEm Description In response to President Bush's Clear Skies Initiative in 2002-a legislative proposal to control the emissions of nitrogen oxides (NO x ), sulfur dioxide (SO 2 ), and mercury (Hg) from power plants-the National Energy Technology Laboratory (NETL) organized a Combustion Technology University Alliance and hosted a Solid Fuel Combustion Technology Alliance Workshop. The workshop identified four high- priority research needs for controlling emissions from fossil-fueled power plants: multipollutant control, improved sorbents and catalysts, mercury monitoring and capture, and an improved understanding of the underlying combustion chemistry.

255

Establishment of an Environmental Control Technology Laboratory with a Circulating Fluidized-Bed Combustion System  

SciTech Connect

This report is to present the progress made on the project ''Establishment of an Environmental Control Technology Laboratory (ECTL) with a Circulating Fluidized-Bed Combustion (CFBC) System'' during the period October 1, 2005 through December 31, 2005. Work was performed on the following activities. First, the fabrication and manufacture of the CFBC Facility is nearly completed. The erection of the CFBC facility is expected to start in the second week of February, 2006. Second, effect of flue gas components on mercury oxidation was investigated in a drop tube reactor. As a first step, experiment for mercury oxidation by chlorine was investigated. The experimental results from this study are presented in this report. Finally, the proposed work for the next quarter is described in this report.

Wei-Ping Pan; Songgeng Li

2006-01-01T23:59:59.000Z

256

EA-507; Environmental Assessment and FONSI For The FAA Explosive Detection System Independent Validation And Verification Program INEL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07; Environmental Assessment and FONSI For The FAA Explosive 07; Environmental Assessment and FONSI For The FAA Explosive Detection System Independent Validation And Verification Program INEL Table of Contents 1. NEED FOR PROPOSED ACTION 2. DESCRIPTION OF THE PROPOSED ACTION 3. ALTERNATIVES TO PROPOSED ACTION 4. ENVIRONMENTAL IMPACTS OF PROPOSED ACTION 5. CONCLUSIONS/SUMMARY 6. LIST OF PREPARERS 7. REFERENCES APPENDIX I Map of WRRTF APPENDIX II Accident Safety Analysis FINDING OF NO SIGNIFICANT IMPACT FEDERAL AVIATION ADMINISTRATION EXPLOSIVE DETECTION SYSTEM - INDEPENDENT VALIDATION AND VERIFICATION PROGRAM LIST OF FIGURES Page XXX WATER REACTOR RESEARCH TEST FACT 1. NEED FOR PROPOSED ACTION The urgent development, fabrication, and operation of advanced explosive detection systems are needed by the Federal Aviation Agency (FAA) to

257

Environmental Microbiology  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Microbiology Environmental Microbiology Examining the soil beneath our feet Read caption + Many environmental molecular biology studies begin with purified DNA and RNA extracted from the soil. Overview of Research and Highlights Learning about microorganisms-bacteria, algae, and fungi-is essential to understanding how living things interact with their environments. Exploration of environmental microbiology at Los Alamos crosses broad scales of investigation that span from identification of genetic regulatory systems in single microorganisms to comprehensive studies of the complex microbial communities resident in soil, water and air. The long term goals of this research are to understand microbial processes and interactions, and the genomic traits underlying these activities, toward:

258

ESTABLISHMENT OF AN ENVIRONMENTAL CONTROL TECHNOLOGY LABORATORY WITH A CIRCULATING FLUIDIZED-BED COMBUSTION SYSTEM  

SciTech Connect

This purpose of this report is to present the progress made on the project ''Establishment of an Environmental Control Technology Laboratory (ECTL) with a Circulating Fluidized-Bed Combustion (CFBC) System'' during the period April 1, 2005 through June 30, 2005. The following tasks have been completed. First, the new Combustion Laboratory was occupied on June 15, 2005, and the construction of the Circulating Fluidized-Bed (CFB) Combustor Building is in the final painting stage. Second, the fabrication and manufacturing contract for the CFBC Facility was awarded to Sterling Boiler & Mechanical, Inc. of Evansville, Indiana. Sterling is manufacturing the assembly and component parts of the CFBC system. The erection of the CFBC system is expected to start September 1, 2005. Third, mercury emissions from the cofiring of coal and chicken waste was studied experimentally in the laboratory-scale simulated fluidized-bed combustion facility. The experimental results from this study are presented in this report. Finally, the proposed work for the next quarter is described.

Wei-Ping Pan; Andy Wu; John T. Riley

2005-07-30T23:59:59.000Z

259

Columbia River System Operation Review : Final Environmental Impact Statement, Appendix R: Pacific Northwest Coordination agreement (PNCA).  

SciTech Connect

Currently, the Federal government coordinates the planning and operation of the Federal Columbia River Power System (FCRPS) with projects owned and operated by the region`s non-Federal hydrogenerating utilities pursuant to the Pacific North-west Coordination Agreement (PNCA). The Bureau of Reclamation (Reclamation), the Corps of Engineers (Corps), and the Bonneville Power Administration (BPA) are parties to the PNCA on behalf of the government of the United States. The PNCA is a complex agreement that provides an opportunity for the region`s power producers to maximize the power system`s reliability and economy while meeting their multiple-use objectives. The PNCA does not dictate the operation of the resources it coordinates. It is essentially an accounting mechanism that exchanges the power produced among the parties in order to improve the reliability of the system and reduce regional power costs. Project owners retain complete autonomy to operate as needed to meet their multiple-use requirements. The PNCA was executed in 1964 as an important component of regional plans to maximize the Northwest`s hydro resource capability. Maximization also included the development of storage projects on the Columbia River in Canada pursuant to the terms of the 1964 Columbia River Treaty. Because of the link between power coordination and Treaty issues, the current parties to the PNCA, currently are contemplating entering into a replacement or renewed power coordination agreement. Because the power coordination agreement is a consensual arrangement, its ultimate provisions must be acceptable to all of its signatories. This Appendix R to the Final Environmental Impact Statement of the Columbia River System is a presentation of the Pacific North-west Coordination Agreement.

Columbia River System Operation Review (U.S.)

1995-11-01T23:59:59.000Z

260

Assessing environmental impacts on stream water quality: deforestation in mid-Wales Hydrology and Earth System Sciences, 6(3), 421431 (2002) EGS  

E-Print Network (OSTI)

the environmental sciences, there are major management issues over the impact of man on the water qualityAssessing environmental impacts on stream water quality: deforestation in mid-Wales 421 Hydrology and Earth System Sciences, 6(3), 421­431 (2002) © EGS Assessing environmental impacts on stream water

Boyer, Edmond

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Environmental Engineering  

E-Print Network (OSTI)

University, 1989 Selected Recent Publications "Reverse Osmosis Biofilm Dispersal by Osmotic Back Retarded Osmosis Energy Production from Natural Salinity Gradients." Environmental Science & Technology, 2013. "A Forward Osmosis-Membrane Distillation Hybrid Process for Direct Sewer Mining: System

Elimelech, Menachem

262

EIS-0251: Department of the Navy Final Environmental Impact Statement for a Container System for the Management of Naval Spent Nuclear Fuel (November 1996)  

Energy.gov (U.S. Department of Energy (DOE))

This Final Environmental Impact Statement addresses six general alternative systems for the loading, storage, transport, and possible disposal of naval spent nuclear fuel following examination.

263

Aeronautical System Center's environmental compliance assessment and management program's cost-saving initiatives support the Air Force's acquisition reform initiative  

SciTech Connect

The Environmental Management directorate of ASC (ASC/EM) has the responsibility of providing government oversight for the Government Owned Contractor Operated Aircraft and Missile plants (GOCOs). This oversight is manifested as a landlord role where Air Force provides the funding required to maintain the plant facilities including buildings and utilities as well as environmental systems. By agreement the companies operating the plants are required to operate them in accordance with environmental law. Presently the GOCOs include Air Force Plant (AFP) 6 in Marietta Ga., AFP 4 in Fort Worth, Tx., AFP 44 in Tucson, Az., AFP 42 in Palmdale, Ca., and AFP PJKS in Denver, Co. Lockheed Martin corporation operates AFPs 4,6, PJKS and a portion of AFP 42 while AFP 44 is operated by Raytheon Missile Systems Company. Other GOCOs at AFP 42 are Northrup-Grumman, Boeing, and Cabaco, the facilities engineer. Since 1992 the Environmental Management division has conducted its Environmental Compliance Assessment and Management Program assessments (ECAMP) annually at each of the plants. Using DOD's ECAMP Team Guide and teams comprised of both Air Force and consultant engineering personnel, each plant is assessed for its environmental compliance well being. In the face of rising operational costs and diminishing budgets ASC/EM performed a comprehensive review of its ECAMP. As a result, the basic ECAMP program was improved to reduce costs without compromising on quality of the effort. The program retained its emphasis in providing a snap-shot evaluation of each Air Force plant's environmental compliance health supported by complete but tailored protocol assessments.

Meanor, T.

1999-07-01T23:59:59.000Z

264

Meeting of The New York State Sustainability Education Working Group Syracuse Center of Excellence In Environmental and Energy Systems  

E-Print Network (OSTI)

In Environmental and Energy Systems 727 East Washington Street Syracuse, New York April 1, 2012 RECOMMENDED ACTIONMeeting of The New York State Sustainability Education Working Group Syracuse Center of Excellence STEPS The Goal: Every graduate of a New York college or university will be literate about how to live

Linsley, Braddock K.

265

This paper has been downloaded from the Building and Environmental Thermal Systems Research Group at Oklahoma State University  

E-Print Network (OSTI)

on Outdoor Coils of Air-Source Heat Pumps. Proceedings of ASME-ATI-UIT. Conference on Thermal and Environmental Issues in Energy Systems 16 ­ 19 May, 2010, Sorrento, Italy INTRODUCTION Air source heat pump and have low installation cost. An air source heat pump exchanges heat directly from the indoor environment

266

2012 CERTS R&M Peer Review - Summary: Dynamic Energy and Environmental Dispatch of Power Systems - Max Zhang  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dispatch of Power Systems Dispatch of Power Systems Project Lead: Max Zhang, Dick Schuler 1. Project objective This project will develop a framework that allows power system operators to co-optimize power flows and environmental flows (air pollution transport). This framework has the potential to provide a cost-effective way for the power sector to meet the increasingly stringent environmental regulations and systems reliability. 2. Major technical accomplishments that will be completed this year We have developed a new mechanism to analyzer Continuous Emission Measurement (CEM) data of electric generation units (EGUs). We have came up with a methodology evaluating the effects of dynamic pricing on load profiles. We will soon finish evaluating the effects of dynamic pricing on reducing EGU emissions during high energy demand

267

Tethys: The Marine and Hydrokinetic Technology Environmental Impacts Knowledge Management System -- Requirements Specification -- Version 1.0  

SciTech Connect

The marine and hydrokinetic (MHK) environmental impacts knowledge management system (KMS), dubbed Tethys after the mythical Greek goddess of the seas, is being developed for the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy Wind and Hydropower Technologies Program (WHTP) by Pacific Northwest National Laboratory (PNNL). This requirements specification establishes the essential capabilities required of Tethys and clarifies for WHTP and the Tethys development team the results that must be achieved by the system.

Butner, R. Scott; Snowden-Swan, Lesley J.; Ellis, Peter C.

2010-11-09T23:59:59.000Z

268

Radiant heating and cooling, displacement ventilation with heat recovery and storm water cooling: An environmentally responsible HVAC system  

SciTech Connect

This paper describes the design, operation, and performance of an HVAC system installed as part of a project to demonstrate energy efficiency and environmental responsibility in commercial buildings. The systems installed in the 2180 m{sup 2} office building provide superior air quality and thermal comfort while requiring only half the electrical energy of conventional systems primarily because of the hydronic heating and cooling system. Gas use for the building is higher than expected because of longer operating hours and poor performance of the boiler/absorption chiller.

Carpenter, S.C.; Kokko, J.P. [Enermodal Engineering Ltd., Kitchener, Ontario (Canada)

1998-12-31T23:59:59.000Z

269

A-1 2003 SITE ENVIRONMENTAL REPORT APPENDIX A: GLOSSARY  

E-Print Network (OSTI)

Objective DSB Duct Service Building DWS Drinking Water Standards EA* Environmental Assessment EDB* ethylene/Cost Analysis EIMS* Environmental Information Management System ELAP Environmental Laboratory Approval Program EML Environmental Measurements Laboratory EMS* Environmental Management System EPA* U.S. Environmental

Homes, Christopher C.

270

ESTABLISHMENT OF AN ENVIRONMENTAL CONTROL TECHNOLOGY LABORATORY WITH A CIRCULATING FLUIDIZED-BED COMBUSTION SYSTEM  

SciTech Connect

The purpose of this report is to present the progress made on the project ''Establishment of an Environmental Control Technology Laboratory with a Circulating Fluidized-Bed Combustion (CFBC) System'' during the quarter January--March 2004. The following tasks have been completed. First, plans for the renovation of space for a new Combustion Laboratory for the CFBC Facility have progressed smoothly. Second, the design calculations, including the mass balances, energy balances, heat transfer, and strength calculations have been completed. Third, considerable modifications have been made on the draft design of the CFBC Facility based on discussions conducted during the project kick-off meeting held on January 13, 2004 at the National Energy Technology Laboratory (NETL). Comments received from various experts were also used to improve the design. Finally, the drawings of all assembly parts have been completed in order to develop specifications for the fabrication of individual parts. At the same time, the proposed work for the next quarter has been outlined in this report.

Wei-Ping Pan; Kunlei Liu; John T. Riley

2004-04-01T23:59:59.000Z

271

The Multimedia Environmental Pollutant Assessment System (MEPAS){reg_sign}: Source-term release formulations  

SciTech Connect

This report is one of a series of reports that document the mathematical models in the Multimedia Environmental Pollutant Assessment System (MEPAS). Developed by Pacific Northwest National Laboratory for the US Department of Energy, MEPAS is an integrated impact assessment software implementation of physics-based fate and transport models in air, soil, and water media. Outputs are estimates of exposures and health risk assessments for radioactive and hazardous pollutants. Each of the MEPAS formulation documents covers a major MEPAS component such as source-term, atmospheric, vadose zone/groundwater, surface water, and health exposure/health impact assessment. Other MEPAS documentation reports cover the sensitivity/uncertainty formulations and the database parameter constituent property estimation methods. The pollutant source-term release component is documented in this report. MEPAS simulates the release of contaminants from a source, transport through the air, groundwater, surface water, or overland pathways, and transfer through food chains and exposure pathways to the exposed individual or population. For human health impacts, risks are computed for carcinogens and hazard quotients for noncarcinogens. MEPAS is implemented on a desktop computer with a user-friendly interface that allows the user to define the problem, input the required data, and execute the appropriate models for both deterministic and probabilistic analyses.

Streile, G.P.; Shields, K.D.; Stroh, J.L.; Bagaasen, L.M.; Whelan, G.; McDonald, J.P.; Droppo, J.G.; Buck, J.W.

1996-11-01T23:59:59.000Z

272

ESTABLISHMENT OF AN ENVIRONMENTAL CONTROL TECHNOLOGY LABORATORY WITH A CIRCULATING FLUIDIZED-BED COMBUSTION SYSTEM  

SciTech Connect

This report is to present the progress made on the project ''Establishment of an Environmental Control Technology Laboratory (ECTL) with a Circulating Fluidized-Bed Combustion (CFBC) System'' during the period January 1, 2005 through March 31, 2005. The following tasks have been completed. First, the renovation of the new Combustion Laboratory is nearly complete, and the construction of the Circulating Fluidized-Bed (CFB) Combustor Building is in the final stages. Second, the fabrication and manufacture of the CFBC Facility is being discussed with a potential contractor. Discussions with potential contactor regarding the availability of materials and current machining capabilities have resulted in the modification of the original designs. The selection of the fabrication contractor for the CFBC Facility is expected during the next quarter. Third, co-firing experiments conducted with coal and chicken waste have been initiated in the laboratory-scale simulated fluidized-bed facility. The experimental results from this study are presented in this report. Finally, the proposed work for the next quarter is described in this report.

Wei-Ping Pan; Andy Wu; John T. Riley

2005-04-30T23:59:59.000Z

273

Establishment of an Environmental Control Technology Laboratory with a Circulating Fluidized-Bed Combustion System  

SciTech Connect

This report is to present the progress made on the project ''Establishment of an Environmental Control Technology Laboratory (ECTL) with a Circulating Fluidized-Bed Combustion (CFBC) System'' during the period July 1, 2005 through September 30, 2005. The following tasks have been completed. First, the construction of the Circulating Fluidized-Bed (CFB) Combustor Building was completed. The experimental facilities have been moved into the CFB Combustor Building. Second, the fabrication and manufacture of the CFBC Facility is in the final stage and is expected to be completed before November 30, 2005. Third, the drop tube reactor has been remodeled and installed to meet the specific requirements for the investigation of the effects of flue gas composition on mercury oxidation. This study will start in the next quarter. Fourth, the effect of sulfur dioxide on molecular chlorine via the Deacon reaction was investigated. The experimental results from this study are presented in this report. Finally, the proposed work for the next quarter is described in this report.

Wei-Ping Pan; Songgeng Li; John T. Riley

2005-10-01T23:59:59.000Z

274

Methodological approach towards sustainability by integration of environmental impact in production system models through life cycle analysis: Application to the Rioja wine sector  

Science Journals Connector (OSTI)

This paper proposes the integration of life cycle analysis within the production system models as a tool for decision making (whether at the strategic, tactical or operational levels) attending not only economic and technical criteria but also the environmental ... Keywords: decision making, environmental impact, life cycle assessment, modeling and simulation, production systems, sustainability

Emilio Jiménez; Eduardo Martínez; Julio Blanco; Mercedes Pérez; Charmery Graciano

2014-02-01T23:59:59.000Z

275

Environmental Intelligence  

NLE Websites -- All DOE Office Websites (Extended Search)

Intelligence Intelligence Answering big questions about environmental change begins with many small measurements (continued on next page) NEWSLETTER OF Oak Ridge National Laboratory's Energy and Environmental Sciences Directorate E nvironmental intelligence is the wealth of information on the physical, biological, and chemical processes that drive Earth's ecosystems (its organisms, soil, air, and water) and the impact humans have on these ecosystems through our practices and developments. Such intelligence is often gathered though small, precise efforts to monitor complex environmental processes with sensing and measurement systems. By collecting new or more detailed observational data from a greater number of locations across the globe, researchers can improve scientific

276

Environmental assessment of SP-100 ground engineering system test site: Hanford Site, Richland, Washington  

SciTech Connect

The US Department of Energy (DOE) proposes to modify an existing reactor containment building (decommissioned Plutonium Recycle Test Reactor (PRTR) 309 Building) to provide ground test capability for the prototype SP-100 reactor. The 309 Building (Figure 1.1) is located in the 300 Area on the Hanford Site in Washington State. The National Environmental Policy Act (NEPA) requires that Federal agencies assess the potential impacts that their actions may have on the environment. This Environmental Assessment describes the consideration given to environmental impacts during reactor concept and test site selection, examines the environmental effects of the DOE proposal to ground test the nuclear subsystem, describes alternatives to the proposed action, and examines radiological risks of potential SP-100 use in space. 73 refs., 19 figs., 7 tabs.

Not Available

1988-12-01T23:59:59.000Z

277

Minimizing Water Production from Unconventional Gas Wells Using a Novel Environmentally Benign Polymer Gel System  

E-Print Network (OSTI)

Excess water production is a major economic and environmental problem for the oil and gas industry. The cost of processing excess water runs into billions of dollars. Polymer gel technology has been successfully used in controlling water influx...

Gakhar, Kush

2012-02-14T23:59:59.000Z

278

Power plants coordination for economic and environmental load dispatch of thermal power plants with wind generation systems  

Science Journals Connector (OSTI)

Economic load dispatch (ELD) and economic emission dispatch (EED) have been applied to obtain generation scheduling of thermal power plants at optimum fuel cost and emissions. Due to limited availability of quality coal, issue of environmental emissions and high prices of coal, installation of renewable energy systems are suggested in power grid. Renewable energy system preferably wind generators are used in co-working with thermal plant which reduces generation cost, coal requirement and environmental emissions. This paper presents Newton-Raphson method to obtain ELD and EED. System simulation and programming is carried out in MATLAB® environment. Analysis has been made on generation cost and for nitrous oxides emissions only due to its harmful effects and its rising tendency with excess air. Price penalty factor is also calculated to determine emission cost. Doubly fed induction generator (DFIG) is suggested as wind energy systems in combination with coal-based thermal plant. Performance results related to generation scheduling, transmission line loading, bus voltages, total cost and environmental emissions are shown for coal-based thermal power plant and with co-generation. The investigation shows that with co-generation, coal-based thermal power plant runs at minimum emissions level which further reflects on the generation economy.

Kishor B. Porate; Krishna L. Thakre; Ghanashyam Bodhe

2013-01-01T23:59:59.000Z

279

The Development and Use of Conceptual Models of Complex Earth Systems for Environmental Managment and Earth Science Education  

E-Print Network (OSTI)

THE DEVELOPMENT AND USE OF CONCEPTUAL MODELS OF COMPLEX EARTH SYSTEMS FOR ENVIRONMENTAL MANAGEMENT AND EARTH SCIENCE EDUCATION A Dissertation by HEATHER RENE MILLER Submitted to the Office of Graduate Studies of Texas A&M... AND EARTH SCIENCE EDUCATION A Dissertation by HEATHER RENE MILLER Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of DOCTOR OF PHILOSOPHY Approved by: Chair...

Miller, Heather

2012-10-19T23:59:59.000Z

280

Columbia River System Operation Review : Final Environmental Impact Statement, Appendix C: Anadromous Fish and Juvenile Fish Transportation.  

SciTech Connect

This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings.

Columbia River System Operation Review (U.S.)

1995-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Environmental Information Resources: Websites and Books  

E-Print Network (OSTI)

McCann (Eds. ). The Impact of Environmental Variability onGuide makes living in an environmentally-aware way easy,Credit Trading Systems (Environmental Market Insights).

Shrode, Flora

2008-01-01T23:59:59.000Z

282

Environmental Justice Strategy | Department of Energy  

Office of Environmental Management (EM)

Calibration Facilities Environmental Justice Environmental Management System Applied Studies and Technology Post-Closure Benefits Property Records Management Stakeholder Relations...

283

Environmental Justice: Memorandum of Understanding | Department...  

Office of Environmental Management (EM)

Calibration Facilities Environmental Justice Environmental Management System Applied Studies and Technology Post-Closure Benefits Property Records Management Stakeholder Relations...

284

DOE/EA-1247; Environmental Assessment for Electrical Power System Upgrades at Los Alamos National Laboratory (03/09/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

47 47 Environmental Assessment for Electrical Power System Upgrades at Los Alamos National Laboratory Los Alamos, New Mexico Final Document Date Prepared: March 9, 2000 Prepared by: U.S. Department of Energy, Los Alamos Area Office Final EA Electrical Power System Upgrades EA March 9, 2000 DOE/LAAO iii CONTENTS ACRONYMS AND TERMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii EXECUTIVE SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1.0 PURPOSE AND NEED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1.1 Role of Cooperating Agencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 Background . . . . . . .

285

Decontamination and Volume Reduction System for Transuranic Waste at Los Alamos National Laboratory, Los Alamos, New Mexico Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

69 69 Decontamination and Volume Reduction System for Transuranic Waste at Los Alamos National Laboratory, Los Alamos, New Mexico Environmental Assessment Final Document Date Prepared: June 23, 1999 Prepared by: U.S. Department of Energy, Los Alamos Area Office Final document Decontamination and Volume Reduction System EA June 23, 1999 DOE/LAAO iii TABLE OF CONTENTS ACRONYMS AND TERMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v EXECUTIVE SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1.0 PURPOSE AND NEED FOR AGENCY ACTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

286

10 - Improving the environmental performance of heavy-duty vehicles and engines: key issues and system design approaches  

Science Journals Connector (OSTI)

Abstract: This chapter reviews various advanced technologies to improve the efficiency and environmental performance of heavy-duty engines, including design and operating characteristics of key subsystems such as fuel injection, conventional and advanced low-temperature combustion, turbocharging, exhaust gas recirculation (EGR), variable valve actuation (VVA), cooling, aftertreatment, waste heat recovery (WHR), and electronic controls. Engine downsizing, down-speeding, down-breathing, turbocompounding, and air system capability performance are summarized by engine system theoretical analysis and numerical simulation for fuel consumption improvement.

Q. Xin; C.F. Pinzon

2014-01-01T23:59:59.000Z

287

Integration of Renewable Energy with Industrial Absorption Refrigeration Systems: Systematic Design and Operation with Technical, Economic, and Environmental Objectives  

Science Journals Connector (OSTI)

Integration of Renewable Energy with Industrial Absorption Refrigeration Systems: Systematic Design and Operation with Technical, Economic, and Environmental Objectives ... Chemical Engineering & Pilot Plant Department, Engineering Division, National Research Centre, El-Buhoos St., Dokki, Cairo, Egypt, 12311 ... Heat is required to run the AR system by heating the absorbent above 80 °C and it can be provided by several media (e.g., Ziegler and Riesch(14) and Herold et al.(15)) including fossil fuels, as well as sustainable energies such as biofuels and solar energy. ...

Jose? Mari?a Ponce-Ortega; Eman A. Tora; J. Betzabe Gonza?lez-Campos; Mahmoud M. El-Halwagi

2011-06-27T23:59:59.000Z

288

Finding of No Significant Impact and Final Environmental Assessment for the Y-12 Potable Water System Upgrade (03/29/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OF NO SIGNIFICANT IMPACT OF NO SIGNIFICANT IMPACT AND FINAL ENVIRONMENTAL ASSESSMENT FOR THE Y-12 POTABLE WATER SYSTEM UPGRADE U.S. Department of Energy Oak Ridge Y-12 Site Office National Nuclear Security Administration DOE/EA - 1548 March 2006 DOE/EA-1548 Finding of No Significant Impact and Final Environmental Assessment for the Y-12 Potable Water System Upgrade U.S. Department of Energy National Nuclear Security Administration March 2006 Final Environmental Assessment for the Y-12 Potable Water System Upgrade

289

Data:A0c93ed9-cc82-4e5a-bb5a-0cb9a9be125f | Open Energy Information  

Open Energy Info (EERE)

c93ed9-cc82-4e5a-bb5a-0cb9a9be125f c93ed9-cc82-4e5a-bb5a-0cb9a9be125f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Elkhorn Rural Public Pwr Dist Effective date: 2013/01/01 End date if known: Rate name: RATE 33- Irrigation Pumping--Full Time Sector: Commercial Description: AVAILABLE: In the general area served by the District. APPLICABLE: To year-round irrigation service to customers who will contract for ten (10) horsepower or more and may be served from existing three phase distribution lines of 12,470 volts. Source or reference: http://www.erppd.com/Rate%20schedules/2012%20Rates/Irrigation%20Rates/SEDC33.pdf

290

Data:Be04e7cf-c7f1-4d7e-8cee-d6ed1c98abb7 | Open Energy Information  

Open Energy Info (EERE)

Be04e7cf-c7f1-4d7e-8cee-d6ed1c98abb7 Be04e7cf-c7f1-4d7e-8cee-d6ed1c98abb7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maui Electric Co Ltd Effective date: 2012/05/04 End date if known: 2013/09/30 Rate name: Maui - TOU EV Residential Time-Of-Use Service with Electric Vehicle Pilot - Single Phase Sector: Residential Description: This Schedule is applicable to residential service customers who combine lighting, heating, cooking, air conditioning, and power in a single family dwelling unit, metered and billed separately, with charging of batteries of on-road electric vehicles. Source or reference: www.mauielectric.com

291

An Evaluation of the Environmental Impact of Different Commercial Supermarket Refrigeration Systems Using Low Global Warming Potential Refrigerants  

SciTech Connect

Commercial refrigeration systems consumed 1.21 Quads of primary energy in 2010 and are known to be a major source for refrigerant charge leakage into the environment. Thus, it is important to study the environmental impact of commercial supermarket refrigeration systems and improve their design to minimize any adverse impacts. The system s Life Cycle Climate Performance (LCCP) was presented as a comprehensive metric with the aim of calculating the equivalent mass of carbon dioxide released into the atmosphere throughout its lifetime, from construction to operation and destruction. In this paper, an open source tool for the evaluation of the LCCP of different air-conditioning and refrigeration systems is presented and used to compare the environmental impact of a typical multiplex direct expansion (DX) supermarket refrigeration systems based on three different refrigerants as follows: two hydrofluorocarbon (HFC) refrigerants (R-404A, and R-407F), and a low global warming potential (GWP) refrigerant (N-40). The comparison is performed in 8 US cities representing different climates. The hourly energy consumption of the refrigeration system, required for the calculation of the indirect emissions, is calculated using a widely used building energy modeling tool (EnergyPlus). A sensitivity analysis is performed to determine the impact of system charge and power plant emission factor on the LCCP results. Finally, we performed an uncertainty analysis to determine the uncertainty in total emissions for both R-404A and N-40 operated systems. We found that using low GWP refrigerants causes a considerable drop in the impact of uncertainty in the inputs related to direct emissions on the uncertainty of the total emissions of the system.

Beshr, Mohamed [University of Maryland, College Park; Aute, Vikrant [University of Maryland, College Park; Abdelaziz, Omar [ORNL; Fricke, Brian A [ORNL; Radermacher, Reinhard [University of Maryland, College Park

2014-01-01T23:59:59.000Z

292

Bayesian Networks and Geographical Information Systems for Environmental Risk Assessment for Oil and Gas Site Development  

E-Print Network (OSTI)

The objective of this work is to develop a Bayesian Network (BN) model to produce environmental risk maps for oil and gas site developments and to demonstrate the model’s scalability from a point to a collection of points. To reach this objective...

Varela Gonzalez, Patricia Ysolda

2013-04-03T23:59:59.000Z

293

UNDERSTANDING THE GENETIC CONSEQUENCES OF ENVIRONMENTAL TOXICANT EXPOSURE: CHERNOBYL AS A MODEL SYSTEM  

E-Print Network (OSTI)

UNDERSTANDING THE GENETIC CONSEQUENCES OF ENVIRONMENTAL TOXICANT EXPOSURE: CHERNOBYL AS A MODEL to Chernobyl radiation. Our results suggest that genetic diversity in radioactive regions of Ukraine to elucidate the effects of toxicant exposure. Keywords--Chernobyl Bank vole Population genetics Comparative

Baker, Robert J.

294

Opportunities for Decay Counting of Environmental Radioisotopes Using Ultra-low-background Detection Systems  

SciTech Connect

Executive Summary We present results from a scoping study whose intent was to define challenge measurements to be pursued on the Ultra-Sensitive Nuclear Measurements Initiative. Potential challenge measurements using new radiation detection technology in the shallow underground laboratory that would have substantial impact in environmental science were the focus of this study.

Runkle, Robert C.; Aalseth, Craig E.; Bailey, Vanessa L.; Bonicalzi, Ricco; Moran, James J.; Seifert, Allen; Warren, Glen A.

2012-08-01T23:59:59.000Z

295

U.S. EPA Environmental Technology Verification (ETV) Program Advanced Monitoring Systems (AMS) Center  

E-Print Network (OSTI)

(GHG) reporting rule. This would leverage existing ETV test/quality assurance plans (TQAPs) for stack Raul Dominguez, South Coast Air Quality Management District (SCAQMD) Rudy Eden, SCAQMD Philip Galvin evaluation, Nebraska Department of Environmental Quality (NDEQ) for microcystins, and EPA Region 7 for carbon

296

Digital Mapping and Environmental Characterization of National Wild and Scenic River Systems  

SciTech Connect

Spatially accurate geospatial information is required to support decision-making regarding sustainable future hydropower development. Under a memorandum of understanding among several federal agencies, a pilot study was conducted to map a subset of National Wild and Scenic Rivers (WSRs) at a higher resolution and provide a consistent methodology for mapping WSRs across the United States and across agency jurisdictions. A subset of rivers (segments falling under the jurisdiction of the National Park Service) were mapped at a high resolution using the National Hydrography Dataset (NHD). The spatial extent and representation of river segments mapped at NHD scale were compared with the prevailing geospatial coverage mapped at a coarser scale. Accurately digitized river segments were linked to environmental attribution datasets housed within the Oak Ridge National Laboratory s National Hydropower Asset Assessment Program database to characterize the environmental context of WSR segments. The results suggest that both the spatial scale of hydrography datasets and the adherence to written policy descriptions are critical to accurately mapping WSRs. The environmental characterization provided information to deduce generalized trends in either the uniqueness or the commonness of environmental variables associated with WSRs. Although WSRs occur in a wide range of human-modified landscapes, environmental data layers suggest that they provide habitats important to terrestrial and aquatic organisms and recreation important to humans. Ultimately, the research findings herein suggest that there is a need for accurate, consistent, mapping of the National WSRs across the agencies responsible for administering each river. Geospatial applications examining potential landscape and energy development require accurate sources of information, such as data layers that portray realistic spatial representations.

McManamay, Ryan A [ORNL; Bosnall, Peter [National Park Service; Hetrick, Shelaine L [ORNL; Smith, Brennan T [ORNL

2013-09-01T23:59:59.000Z

297

Columbia River System Operation Review : Final Environmental Impact Statement, Appendix F: Irrigation, Municipal and Industrial/Water Supply.  

SciTech Connect

Since the 1930`s, the Columbia River has been harnessed for the benefit of the Northwest and the nation. Federal agencies have built 30 major dams on the river and its tributaries. Dozens of non-Federal projects have been developed as well. The dams provide flood control, irrigation, navigation, hydro-electric power generation, recreation, fish and wildlife, and streamflows for wildlife, anadromous fish, resident fish, and water quality. This is Appendix F of the Environmental Impact Statement for the Columbia River System, focusing on irrigation issues and concerns arrising from the Irrigation and Mitigation of impacts (M&I) working Group of the SOR process. Major subheadings include the following: Scope and process of irrigation/M&I studies; Irrigation/M&I in the Columbia Basin Today including overview, irrigated acreage and water rights, Irrigation and M&I issues basin-wide and at specific locations; and the analysis of impacts and alternative for the Environmental Impact Statement.

Columbia River System Operations Review (U.S.); United States. Bonneville Power Administration; United States. Army. Corps of Engineers. North Pacific Division; United States. Bureau of Reclamation. Pacific Northwest Region.

1995-11-01T23:59:59.000Z

298

Environmental Sustainability  

E-Print Network (OSTI)

Energy Systems & Climate Change 21 3.2 Communication 24 #12;Prospectus for Environmental Sustainability: Distance Learning 2014-2015 3 MEEN40820 Technical Communications 24 IS40030 People Information & Communication 26 ENVB40380 Managing the Interface between Science & Policy 28 3.3 Resource Characterisation

299

Environmental Sustainability  

E-Print Network (OSTI)

Energy Systems & Climate Change 21 3.2 Communication 24 #12;Prospectus for Environmental Sustainability: Distance Learning 2013-2014 3 MEEN40820 Technical Communications 24 IS40030 People Information & Communication 26 ENVB40380 Managing the Interface between Science & Policy 28 3.3 Resource Characterisation

300

DEVELOPMENT OF A TAMPER RESISTANT/INDICATING AEROSOL COLLECTION SYSTEM FOR ENVIRONMENTAL SAMPLING AT BULK HANDLING FACILITIES  

SciTech Connect

Environmental sampling has become a key component of International Atomic Energy Agency (IAEA) safeguards approaches since its approval for use in 1996. Environmental sampling supports the IAEA's mission of drawing conclusions concerning the absence of undeclared nuclear material or nuclear activities in a Nation State. Swipe sampling is the most commonly used method for the collection of environmental samples from bulk handling facilities. However, augmenting swipe samples with an air monitoring system, which could continuously draw samples from the environment of bulk handling facilities, could improve the possibility of the detection of undeclared activities. Continuous sampling offers the opportunity to collect airborne materials before they settle onto surfaces which can be decontaminated, taken into existing duct work, filtered by plant ventilation, or escape via alternate pathways (i.e. drains, doors). Researchers at the Savannah River National Laboratory and Oak Ridge National Laboratory have been working to further develop an aerosol collection technology that could be installed at IAEA safeguarded bulk handling facilities. The addition of this technology may reduce the number of IAEA inspector visits required to effectively collect samples. The principal sample collection device is a patented Aerosol Contaminant Extractor (ACE) which utilizes electrostatic precipitation principles to deposit particulates onto selected substrates. Recent work has focused on comparing traditional swipe sampling to samples collected via an ACE system, and incorporating tamper resistant and tamper indicating (TRI) technologies into the ACE system. Development of a TRI-ACE system would allow collection of samples at uranium/plutonium bulk handling facilities in a manner that ensures sample integrity and could be an important addition to the international nuclear safeguards inspector's toolkit. This work was supported by the Next Generation Safeguards Initiative (NGSI), Office of Nonproliferation and International Security (NIS), National Nuclear Security Administration (NNSA).

Sexton, L.

2012-06-06T23:59:59.000Z

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

ENVIRONMENTAL ENGINEERING  

E-Print Network (OSTI)

ENVIRONMENTAL ENGINEERING UNDERGRADUATE HANDBOOK Cornell University Department of Biological and Environmental Engineering School of Civil and Environmental Engineering enve.cornell.edu 2013-2014 #12;Environmental Engineering 2013-2014 1 UNDERGRADUATE HANDBOOK FOR ENVIRONMENTAL ENGINEERING MISSION STATEMENT

Walter, M.Todd

302

Environmental Restoration Program project management plan for the DOE Oak Ridge Field Office Major System Acquisition OR-1. Revision 1, Environmental Restoration Program  

SciTech Connect

In the early 1940s, the Manhattan Project was conducted in a regulatory and operational environment less sophisticated than today. Less was known of the measures needed to protect human health and safety and the environment from the dangers posed by radioactive and hazardous wastes, and experience in dealing with these hazardous materials has grown slowly. Certain hazards were recognized and dealt with from the beginning. However, the techniques used, though standard practices at the time, are now known to have been inadequate. Consequently, the DOE has committed to an aggressive program for cleaning up the environment and has initiated an Environmental Restoration Program involving all its field offices. The objective of this program is to ensure that inactive and surplus DOE facilities and sites meet current standards to protect human health and the environment. The objective of these activities is to ensure that risks posed to human health and safety and the environment by inactive sites and surplus facilities contaminated with radioactive, hazardous, and/or mixed wastes are either eliminated or reduced to prescribed safe levels. This Project Management Plan for Major System Acquisition OR-1 Project documents, communicates, and contributes to the evolution of, the management organizations, systems, and tools necessary to carry out effectively the long-range complex cleanup of the DOE sites on the Oak Ridge Reservation, and at the Paducah, Kentucky, and Piketon, Ohio, uranium enrichment plants managed by the Department of Energy Oak Ridge Field Office; the cleanup of off-site contamination resulting from past releases; and the Decontamination and Decommissioning of surplus DOE facilities at these installations.

Not Available

1992-12-01T23:59:59.000Z

303

System level assessment of uncertainty in aviation environmental policy impact analysis  

E-Print Network (OSTI)

This thesis demonstrates the assessment of uncertainty of a simulation model at the system level, which takes into account the interaction between the modules that comprise the system. Results from this system level ...

Liem, Rhea Patricia

2010-01-01T23:59:59.000Z

304

Identifying the concepts, principles, and applications of technology needed by entry-level workers in food, environmental, and natural resource systems in 2010  

E-Print Network (OSTI)

IDENTIFYING THE CONCEPTS, PRINCIPLES, AND APPLICATIONS OF TECHNOLOGY NEEDED BY ENTRY-LEVEL WORKERS IN FOOD, ENVIRONMENTAL, AND NATURAL RESOURCE SYSTEMS IN 2010 A Thesis RYAN ALLAN HEGER Submitted to the Office of Graduate Studies of Texas A..., ENVIRONMENTAL, AND NATURAL RESOURCE SYSTEMS IN 2010 A Thesis by RYAN ALLAN HEGER Submitted to Texas A8 M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE Approved as to style and content by: Glen C. Shinn (Chair...

Heger, Ryan Allan

2012-06-07T23:59:59.000Z

305

Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement  

SciTech Connect

Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would favor a management approach that fosters low-growing plant communities.

N /A

2000-06-23T23:59:59.000Z

306

Integrated Omics in Systems Biology: The New Frontier for Environmental Biotechnology  

SciTech Connect

Environmental biotechnology encompasses a wide range of characterization, monitoring and control for bioenergy and bioremediation technologies that are based on biological processes. Recent breakthroughs in our understanding of biogeochemical processes and genomics are leading to exciting new and cost effective ways to monitor and manipulate the environment and potentially produce bioenergy fuels as we also cleanup the environment. Indeed, our ability to sequence an entire microbial genome in just a few hours is leading to similar breakthroughs in characterizing proteomes, metabolomes, phenotypes, and fluxes for organisms, populations, and communities. Understanding and modeling functional microbial community structure and stress responses in subsurface environments has tremendous implications for our fundamental understanding of biogeochemistry and the potential for making biofuel breakthroughs. Monitoring techniques that inventory and monitor terminal electron acceptors and electron donors, enzyme probes that measure functional activity in the environment, functional genomic microarrays, phylogenetic microarrays, metabolomics, proteomics, and quantitative PCR are also being rapidly adapted for studies in environmental biotechnology. Integration of all of these new high throughput techniques using the latest advances in bioinformatics and modeling will enable break-through science in environmental biotechnology. A review of these techniques with examples from field studies and lab simulations will be discussed.

Hazen, Terry C.

2008-08-12T23:59:59.000Z

307

Structural and environmental monitoring of tracker and vertex systems using Fiber Optic Sensors  

E-Print Network (OSTI)

Fibre optic sensors (FOS) are an established technique for environmental and deformation monitoring in several areas like civil engineering, aerospace, and energy. Their immunity to electromagnetic and magnetic fields and nuclear environments, its small size, multiplexing capability and the possibility to be embedded make them an attractive technology for the structural and environmental monitoring of collider particle physics experiments. Between all the possible Fibre Optic sensors FBGs (Fiber Bragg Grating) seems to be the best solution for HEP applications. The first step was to characterize FBG sensors for it use in High Energy Physics environment. During last two years we have checked the resistance of the Fibre Bragg Grating sensors to radiation. Two irradiation campaigns with protons have been done at CNA (Centro Nacional de Aceleradores). In the near future these sensors are being planned to be used in detectors (the closest one Belle II.). Several work on integration issues in Belle II PXD-SVD, and checking for environmental and deformation monitoring in the detectors inner part has been done.

David Moya; Iván Vila

2012-03-01T23:59:59.000Z

308

Data management plan for the Oak Ridge Environmental Information System, Version 1.1. Enviornmental Restoration Program  

SciTech Connect

The Data Management Plan (DMP) describes the data management objectives, system components, data base structure and contents, system maintenance, data processing, and user interface for the prototype phase of the Oak Ridge Environmental Information System (OREIS). The major goals of OREIS data management are to compile data of known quality, to maintain the integrity of the data base, and to provide data to users. The DMP defines the requirements, describes the responsibilities, and references the procedures for meeting the data management objectives. Emphasis is on management of measurement data and the associated metadata used to support its proper interpretation and legal defensibility. The DMP covers transmittal, processing, storage, and data access activities associated with OREIS. The OREIS data dictionary is provided as an appendix.

Not Available

1992-08-04T23:59:59.000Z

309

Environmental Programs Environmental Programs Committee  

E-Print Network (OSTI)

(Architecture) The Environmental Programs Committee coordinates courses and curricula on environmental topics. Wiesner (Civil and Environmental Engineering) Gordon G. Wittenberg (Architecture) #12;162 Environmental Programs Environmental Programs Committee Walter Whitfield Isle, Chair (English

Richards-Kortum, Rebecca

310

A Framework for Environmental Assessment of CO2 Capture and Storage Systems  

E-Print Network (OSTI)

impacts of bioenergy systems depend on market and regulatoryeffects. Bioenergy LCAs have recently considered market

Sathre, Roger

2013-01-01T23:59:59.000Z

311

MONTANA STATE UNIVERSITY DEPARTMENT OF LAND RESOURCES & ENVIRONMENTAL SCIENCES Degree Requirements for a B. S. in Sustainable Foods & Bioenergy Systems Agroecology Option 20142015 Catalog  

E-Print Network (OSTI)

Requirements for a B. S. in Sustainable Foods & Bioenergy Systems Agroecology Option 20142015 Catalog Name ENSC 110 Land Resources & Environmental Sciences 3 F SFBS 146 Intro Sust Food/Bioenergy Systems 3) Vegetable Production 3 F HORT 345 Organic Market Gardening 3 Su NASX 415 (even years) Native Food Systems 3

Maxwell, Bruce D.

312

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement - Appendices Statement - Appendices DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement DOE/EIS-0285 APPENDICES May 2000 Table of Contents Appendix A - Public Involvement: Publications Appendix B - Biological Weed Control Agents Appendix C - Bonneville Pesticide Applicator Certification Plan Appendix D - Sample Educational Information Appendix E - Clearance Criteria Appendix F - FS Mitigation Measures and Background Appendix G - BLM Mitigation Measures and Background Appendix H - Herbicide Fact Sheets 2,4-D Azafenidin Bromacil Chlorsulfuron Clopyralid Dicamba Dichlobenil Diuron Fosamine Ammonium Glyphosate Halosulfuron-methyl Hexazinone Imazapyr Isoxaben Mefluidide Metsulfuron-methyl

313

Integrated chemical management system: A tool for managing chemical information at the Rocky Flats Environmental Technology Site  

SciTech Connect

The Integrated Chemical Management System is a computer-based chemical information at the Rocky Flats Environmental Technology Site. Chemical containers are identified by bar code labels and information on the type, quantity and location of chemicals are tracked on individual data bases in separate buildings. Chemical inventories from multiple buildings are uploaded to a central sitewide chemical data base where reports are available from Product, Waste, and Chemical Use modules. Hazardous chemical information is provided by a separate Material Safety Data Sheet module and excess chemicals are traded between chemical owners and users with the aid of the Chemical Exchange Module.

Costain, D. [Kaiser-Hill Co., Golden, CO (United States)

1995-07-01T23:59:59.000Z

314

Faculty of Engineering Civil and Environmental  

E-Print Network (OSTI)

pollution control, chemical reaction engineering, environmental microbiology and environmental assessment industry · Environmental protection · Project, process and systems management · Robotics and advanced institution in Canada. The CEI was constructed to meet the highest environmental standards and to provide

315

A condition-based maintenance policy for a production system under excessive environmental degradation  

Science Journals Connector (OSTI)

In this paper a condition-based maintenance model is proposed for a single-unit system of production of goods and services. The system is subject to random deterioration which impacts not only the product quality but also the environment. We assume that ... Keywords: Condition-based maintenance policy, Nelder---Mead algorithm, Optimization, System degradation

H. Chouikhi; A. Khatab; N. Rezg

2014-08-01T23:59:59.000Z

316

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Statement DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (DOE/EIS-0285) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy Cooperating Agencies: U.S. Forest Service (FS), U.S. Department of Agriculture; Bureau of Land Management (BLM), U.S. Department of Interior Title of Proposed Action: Transmission System Vegetation Management Program States Involved: California, Idaho, Montana, Oregon, Utah, Washington, and Wyoming Abstract: Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation.

317

E-SMART system for in-situ detection of environmental contaminants. Quarterly technical progress report, October--December 1996  

SciTech Connect

General Atomics (GA) leads a team of industrial, academic, and government organizations in the development of the Environmental Systems Management, Analysis and Reporting neTwork (E-SMART) for the Defense Advanced Research Project Agency (DARPA), by way of this Technology Reinvestment Project (TRP). E-SMART defines a standard by which networks of smart sensing, sampling, and control devices can interoperate. E-SMART is intended to be an open standard, available to any equipment manufacturer. The user will be provided a standard platform on which a site-specific monitoring plan can be implemented using sensors and actuators from various manufacturers and upgraded as new monitoring devices become commercially available. This project will further develop and advance the E-SMART standardized network protocol to include new sensors, sampling systems, and graphical user interfaces.

NONE

1997-01-01T23:59:59.000Z

318

A demonstration of the applicability of implementing the enhanced Remedial Action Priority System (RAPS) for environmental releases  

SciTech Connect

The Remedial Action Priority System (RAPS) and the Multimedia Environmental Pollutant Assessment System (MEPAS) were developed to prioritize problems associated with potential releases of hazardous chemical and radioactive materials in a scientific and objective manner based on limited site information. This report documents the model testing efforts of the RAPS/MEPAS methodology for the atmospheric, surface water, groundwater, and exposure components. Comparisons are given of model outputs with measured data at three sites: the US Department of Energy's Mound facility in Ohio and Hanford facility in Washington, and a chromium-cadmium plating site in New York. The results show that the simulated magnitudes, spacial and temporal trends, and distributions of contaminants corresponded well with the measured data. 25 refs., 86 figs., 26 tabs.

Whelan, G.; Droppo, J.G. Jr.; Strenge, D.L.; Walter, M.B.; Buck, J.W.

1989-12-01T23:59:59.000Z

319

Researching Complex Heat, Air and Moisture Interactions for a Wide-Range of Building Envelope Systems and Environmental Loads  

SciTech Connect

This document serves as the final report documenting work completed by Oak Ridge National Laboratory (ORNL) and the Fraunhofer Institute in Building Physics (Holzkirchen, Germany) under an international CRADA No. 0575 with Fraunhofer Institute of Bauphysics of the Federal Republic of Germany for Researching Complex Heat, Air and Moisture Interactions for a Wide Range of Building Envelope Systems and Environmental Loads. This CRADA required a multi-faceted approach to building envelope research that included a moisture engineering approach by blending extensive material property analysis, laboratory system and sub-system thermal and moisture testing, and advanced moisture analysis prediction performance. The Participant's Institute for Building physics (IBP) and the Contractor's Buildings Technology Center (BTC) identified potential research projects and activities capable of accelerating and advancing the development of innovative, low energy and durable building envelope systems in diverse climates. This allowed a major leverage of the limited resources available to ORNL to execute the required Department of Energy (DOE) directives in the area of moisture engineering. A joint working group (ORNL and Fraunhofer IBP) was assembled and a research plan was executed from May 2000 to May 2005. A number of key deliverables were produced such as adoption of North American loading into the WUFI-software. in addition the ORNL Weather File Analyzer was created and this has been used to address environmental loading for a variety of US climates. At least 4 papers have been co-written with the CRADA partners, and a chapter in the ASTM Manual 40 on Moisture Analysis and Condensation Control. All deliverables and goals were met and exceeded making this collaboration a success to all parties involves.

Karagiozis, A.N.

2007-05-15T23:59:59.000Z

320

Environmental Quality: Air (Louisiana)  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Environmental Quality regulates air quality in Louisiana. The Department has an established a fee system for funding the monitoring, investigation and other activities required...

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Environmental Stewardship  

E-Print Network (OSTI)

Environmental Stewardship Environmental Stewardship #12;Organizational Opportunities or Threats Environmental StewardshipEnvironmental Stewardship #12;ADOT Organizational StructureADOT Organizational of safety and efficiency, while retaining and promoting its irreplaceable natural landscape and protecting

Minnesota, University of

322

EA-437; Environmental Assessment Process Equipment Waste and Process Waste Liquid Collection Systems Idaho Chemical Processing Plant Idaho National Engineering Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

437; Environmental Assessment Process Equipment Waste and 437; Environmental Assessment Process Equipment Waste and Process Waste Liquid Collection Systems Idaho Chemical Processing Plant Idaho National Engineering Laboratory TABLE OF CONTENTS Environmental Assessment Process Equipment Waste and Process Waste Liquid Collection Systems Idaho Chemical Processing Plant Idaho National Engineering Laboratory 1. INTRODUCTION 2. DESCRIPTION OF THE PROPOSED ACTION AND ALTERNATIVES 2.1 Purpose and Need of the Proposed Action 2.2 Description of the Affected Facilities 2.3 Description of Proposed Action 2.4 Alternatives to the Proposed Action 2.5 Separate But Related Actions 3. AFFECTED ENVIRONMENT 3.1 Introduction 3.2 Physical Environment 3.3 Biological Resources 3.4 Cultural Resources 3.5 Environmental Quality and Monitoring Programs

323

Optimal Scheduling for Biocide and Heat Exchangers Maintenance Towards Environmentally Friendly Seawater Cooling Systems  

E-Print Network (OSTI)

FOR SEAWATER-COOLED POWER AND DESALINATION PLANTS....................................................... 127 5.1 Overview .............................................................................................. 127 5.2 Introduction... 5.2 Representation of a Once-Thorough Cooling System................................ 141 5.3 An Overall Representation of the Power/Desalination Plant ..................... 152 5.4 The Cooling System for the Case Study...

Binmahfouz, Abdullah

2012-10-19T23:59:59.000Z

324

ENGINEERING GRaduatE PRoGRams Biological SyStemS engineering Biomedical engineering chemical engineering civil and environmental engineering  

E-Print Network (OSTI)

modeling, environmental engineering, fluid mechanics and rheology, materials processing, nanotechnology resources engineering (hydraulics and fluid mechanics, hydrology, and systems planning and designENGINEERING GRaduatE PRoGRams Biological SyStemS engineering § Biomedical engineering § chemical

California at Davis, University of

325

Wetland model in an earth systems modeling framework for regional environmental policy analysis  

E-Print Network (OSTI)

The objective of this research is to investigate incorporating a wetland component into a land energy and water fluxes model, the Community Land Model (CLM). CLM is the land fluxes component of the Integrated Global Systems ...

Awadalla, Sirein Salah

2011-01-01T23:59:59.000Z

326

Biological and environmental efficiency of high producing dairy systems through application of life cycle analysis   

E-Print Network (OSTI)

Dairy production systems are an important global contributor to anthropogenic greenhouse gas (GHG) emissions including methane (CH4), nitrous oxide (N2O) and carbon dioxide (CO2). Due to the role GHG play in climate ...

Ross, Stephen Alexander

2014-11-27T23:59:59.000Z

327

A Hierarchical Fuzzy Decision Support System for the Environmental Rehabilitation of Lake Koronia, Greece  

Science Journals Connector (OSTI)

This article presents the design of a fuzzy decision support system (DSS) for the assessment of alternative strategies proposed for the restoration of Lake Koronia, Greece. Fuzzy estimates for the critical cha...

Panagiotis Tzionas; Irene A. Ioannidou…

2004-08-01T23:59:59.000Z

328

The upturned concrete beam system : an investigation of structural, environmental, and constructability performance  

E-Print Network (OSTI)

While the recently completed U.S. Federal Building in San Francisco features numerous sustainable aspects that reduce energy demand, the most impressive feature required a distinctive structural floor system. Designers ...

Young, Hunter A. (Hunter Andrew)

2009-01-01T23:59:59.000Z

329

Assessment of the environmental footprint of nuclear energy systems. Comparison between closed and open fuel cycles  

Science Journals Connector (OSTI)

Abstract Energy perspectives for the current century are dominated by the anticipated significant increase of energy needs. Particularly, electricity consumption is anticipated to increase by a factor higher than two before 2050. Energy choices are considered as structuring political choices that implies a long-standing and stable policy based on objective criteria. LCA (life cycle analysis) is a structured basis for deriving relevant indicators which can allow the comparison of a wide range of impacts of different energy sources. Among the energy-mix, nuclear power is anticipated to have very low GHG-emissions. However, its viability is severely addressed by the public opinion after the Fukushima accident. Therefore, a global LCA of the French nuclear fuel cycle was performed as a reference model. Results were compared in terms of impact with other energy sources. It emphasized that the French nuclear energy is one of the less impacting energy, comparable with renewable energy. In a second, part, the French scenario was compared with an equivalent open fuel cycle scenario. It demonstrates that an open fuel cycle would require about 16% more natural uranium, would have a bigger environmental footprint on the “non radioactive indicators” and would produce a higher volume of high level radioactive waste.

Ch. Poinssot; S. Bourg; N. Ouvrier; N. Combernoux; C. Rostaing; M. Vargas-Gonzalez; J. Bruno

2014-01-01T23:59:59.000Z

330

Letter Report: Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Pahranagat National Wildlife Refuge, Lincoln County, Nevada  

SciTech Connect

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Pahranagat NWR, Beatty, Rachel, Caliente, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data on completion of the site's sampling program.

J. Englebrecht; I. Kavouras; D. Campbell; S. Campbell; S. Kohl; D. Shafer

2008-08-01T23:59:59.000Z

331

Letter Report Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Pahranagat National Wildlife Refuge, Lincoln County, Nevada  

SciTech Connect

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Pahranagat NWR, Beatty, Rachel, Caliente, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data on completion of the site's sampling program.

J. Engelbrecht; I. Kavouras; D. Campbell; S. Campbell; S. Kohl; D. Shafer

2009-04-02T23:59:59.000Z

332

Letter Report Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Tonopah Airport, Nye County, Nevada  

SciTech Connect

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Tonopah Airport, Beatty, Rachel, Caliente, Pahranagat NWR, Crater Flat, and the Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

J. Engelbrecht; I. Kavouras; D. Campbell; S. Campbell; S. Kohl; D. Shafer

2009-04-02T23:59:59.000Z

333

Letter Report: Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Tonopah Airport, Nye County, Nevada  

SciTech Connect

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Tonopah Airport, Beatty, Rachel, Caliente, Pahranagat NWR, Crater Flat, and the Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

J. Engelbrecht; I. Kavouras; D Campbell; S. Campbell; S. Kohl, D. Shafer

2008-08-01T23:59:59.000Z

334

Letter Report: Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Caliente, Lincoln County, Nevada  

SciTech Connect

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Beatty, Sarcobatus Flats, Rachel, Caliente, Pahranagat NWR, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

J. Englebrecht; I. Kavouras; D. Campbell; S. Campbell; S. Kohl; D. Shafer

2008-08-01T23:59:59.000Z

335

Letter Report Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Crater Flat, Nye County, Nevada  

SciTech Connect

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) (cover page figure) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Beatty, Sarcobatus Flats, Rachel, Caliente, Pahranagat NWR, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

J. Engelbrecht; I. Kavouras; D. Campbell; S.Campbell; S. Kohl; D. Shafer

2009-04-02T23:59:59.000Z

336

Letter Report: Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Crater Flat, Nye County, Nevada  

SciTech Connect

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) (cover page figure) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Beatty, Sarcobatus Flats, Rachel, Caliente, Pahranagat NWR, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

J. Engelbrecht; I. Kavouras; D. Campbell; S. Campbell; S. Kohl; D. Shafer

2008-08-01T23:59:59.000Z

337

Environmental Impact Statement for the Proposed Production of Plutonium - 238 for Use in Advanced Radioisotope Power Systems for Future Space Missions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

98 98 Federal Register / Vol. 63, No. 192 / Monday, October 5, 1998 / Notices DEPARTMENT OF ENERGY Environmental Impact Statement for the Proposed Production of Plutonium- 238 for Use in Advanced Radioisotope Power Systems for Future Space Missions AGENCY: Department of Energy (DOE). ACTION: Notice of Intent. SUMMARY: Pursuant to the National Environmental Policy Act (NEPA), DOE announces its intent to prepare an environmental impact statement (EIS) for the proposed production of plutonium-238 (Pu-238) using one or more DOE research reactors and facilities. The Pu-238 would be used in advanced radioisotope power systems for potential future space missions. Without a long-term supply of Pu-238, DOE would not be able to provide the radioisotope power systems that may be required for these potential future space

338

Optimal fuzzy multi-objective design of a renewable energy system with economics, reliability, and environmental emissions considerations  

Science Journals Connector (OSTI)

Besides economical issues reliability and environmental emissions have become major concerns whenever an energy system is designed. The objective of this study is to design both an autonomous and non-autonomous hybrid green power system (HGPS) to supply a specific load demand considering economics reliability indices and environmental emissions. The HGPS includes wind turbine (WT) photovoltaic (PV) array fuel cell and the actual data used for simulation which are annual solar irradiation and wind speed for the state of Illinois. For reliability analysis it is assumed that only WT PV DC/AC convertor and electrical network might have failure in supplying power. To evaluate the actual reliability level of the HGPS equipments all possible conditions should be considered and for each one of them the reliability indices are estimated by determining the quantity and probability of load demands not supplied. However in this study an approximate model is utilized to examine the reliability indices. In the approximate model the average power generation of WT units and PV array is utilized (instead of considering the outage of each WT unit and PV array separately) and then the mathematical expectation of reliability indices is calculated. The results show that the reliability indices are activated when there is no backup (electrical network) for the HGPS. The utilization of HGPS in parallel with electrical network when cost is given the highest importance leads to the purchase of all power from the electrical network. However when emission is considered as the second objective function in the fuzzy multi-objective problem; the degree of importance given to each function (total cost and emission) plays a major role in the optimal design of HGPS.

2014-01-01T23:59:59.000Z

339

EIS-0139: Trans-Alaska Gas System Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

This EIS analyzes the Yukon Pacific Corporation (YPC) proposed construction of the Trans-Alaska Gas System (TAGS) a 796.5 mile long 36-inch diameter pipeline to transport High Pressured Natural Gas between Prudhoe Bay and a Tidewater terminal and LNG Plant near Anderson Bay, AK.

340

School of Environmental & Biological Sciences 11:709:349-Management of Foodservice Systems  

E-Print Network (OSTI)

1/23 Foodservice Management, let's review what we know Text Ch 1 & 2 Class Discussion-Checklists Get into groups 1/28 Management of Foodservice Systems; Regulatory environment. A little history More Culinary/8) 4/10, 4/15 Management Functions 4/17, 4/22, 4/24, 4/29 (Marketing plan, Employee Schedules

Chen, Kuang-Yu

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

A prototype system for economic, environmental and sustainable optimization of a chemical complex  

E-Print Network (OSTI)

. A second application of the prototype was based on an agricultural chemical complex with ten multiple plant of the system to select an optimum configuration of plants in an agricultural chemical complex tools such as Total (full) Cost Assessment (ac- counting) (TCA), Life Cycle Assessment (LCA

Pike, Ralph W.

342

Livestock waste treatment systems for environmental quality, food safety, and sustainability.  

E-Print Network (OSTI)

to the sustainability of agricultural systems by: (i) utilizing crop residues and other feeds which were not used and otherwise would be lost, and; (iii) for the poorest regions of the world, providing traction for cultivation, supply for energy production or home construction (dried cowpat). However, the price of goods produce

Paris-Sud XI, Université de

343

Final safety evaluation report related to the certification of the System 80{sup +} design (Docket No. 52-002). Volume 1, Chapters 1--14  

SciTech Connect

This final safety evaluation report (FSER) documents the technical review of the System 80+ standard design by the US Nuclear Regulatory Commission (NRC) staff. The application for the System 80+ design was submitted by Combustion Engineering, Inc., now Asea Brown Boveri-Combustion Engineering (ABB-CE) as an application for design approval and subsequent design certification pursuant to 10 CFR {section} 52.45. System 80+ is a pressurized water reactor with a rated power of 3914 megawatts thermal (MWt) and a design power of 3992 MWt at which accidents are analyzed. Many features of the System 80+ are similar to those of Abb-CE`s System 80 design from which it evolved. Unique features of the System 80+ design included: a large spherical, steel containment; an in-containment refueling water storage tank; a reactor cavity flooding system, hydrogen ignitors, and a safety depressurization system for severe accident mitigation; a combustion gas turbine for an alternate ac source; and an advanced digitally based control room. On the basis of its evaluation and independent analyses, the NRC staff concludes that ABB-CE`s application for design certification meets the requirements of Subpart B of 10 CFR Part 52 that are applicable and technically relevant to the System 80+ standard design. This document, Volume 1, contains Chapters 1 through 14 of this report.

Not Available

1994-08-01T23:59:59.000Z

344

Environmental assessment for the Satellite Power System (SPS) Concept Development and Evaluation Program (CDEP). [Microwave and non-microwave health and ecological assessment  

SciTech Connect

In the satellite power system (SPS), satellites in geosynchronous earth orbit would collect solar energy in space, convert it to microwaves, and transmit the microwaves to receiving antennas (rectennas) on earth. At the rectennas, the microwave energy would be converted to electricity. This SPS environmental assessment considers the microwave and nonmicrowave effects on the terrestrial environment and human health, atmospheric effects, and effects on electromagnetic systems. No environmental problem has been identified that would preclude the continued study of SPS technology. To increase the certainty of the assessment, some research has been initiated and long-term research is being planned.

Valentino, A.R.

1980-08-01T23:59:59.000Z

345

Environmentally safe fluid extractor  

DOE Patents (OSTI)

An environmentally safe fluid extraction device for use in mobile laboratory and industrial settings comprising a pump, compressor, valving system, waste recovery tank, fluid tank, and a exhaust filtering system.

Sungaila, Zenon F. (Orland Park, IL)

1993-01-01T23:59:59.000Z

346

Columbia River System Operation Review : Final Environmental Impact Statement, Main Report.  

SciTech Connect

The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement.

Columbia River System Operation Review (U.S.); United States. Bonneville Power Administration; United States. Army. Corps of Engineers. North Pacific Division; United States. Bureau of Reclamation. Pacific Northwest Region.

1995-11-01T23:59:59.000Z

347

Environmentally induced corrections to the geometric phase in a two-level system  

E-Print Network (OSTI)

We calculate the geometric phase for different open systems (spin-boson and spin-spin models). We study not only how they are corrected by the presence of the different type of environments but also discuss the appearence of decoherence effects. These should be taken into account when planning experimental setups to study the geometric phase in the nonunitary regime. We propose a model with slow decoherence rate in which the geometric phase is still modified and might be measured.

Fernando C. Lombardo; Paula I. Villar

2008-02-20T23:59:59.000Z

348

Mobile Robot Sensing for Environmental Applications  

E-Print Network (OSTI)

architecture to provide autonomous system operation. 3 IDEA (Iterative experimental Design for Environmental

2007-01-01T23:59:59.000Z

349

Blanc, I., Beloin-Saint-Pierre, D., Payet, J., Jacquin, P., Adra, N., Mayer, D., Espace-PV: key sensitive parameters for environmental impacts of grid-connected PV systems with LCA , In Proceedings of the 23rd  

E-Print Network (OSTI)

sensitive parameters for environmental impacts of grid-connected PV systems with LCA », In Proceedings FOR ENVIRONMENTAL IMPACTS OF GRID-CONNECTED PV SYSTEMS WITH LCA I. BLANC1 , D. BELOIN-SAINT-PIERRE1 , J. PAYET2 , P of sensitive parameters for the life cycle analysis (LCA) of PV system showed that irradiation intensity

Paris-Sud XI, Université de

350

Environmental justice implications of arsenic contamination in California¿s San Joaquin Valley: a cross-sectional, cluster-design examining exposure and compliance in community drinking water systems  

E-Print Network (OSTI)

in community drinking water systems. Environmental Healthconcentrations in drinking water in Chile. Epidemiologyand enforcement of the safe drinking water act: The Arizona

Balazs, Carolina L; Morello-Frosch, Rachel; Hubbard, Alan E; Ray, Isha

2012-01-01T23:59:59.000Z

351

Columbia River System Operation Review : Final Environmental Impact Statement, Appendix D: Exhibits.  

SciTech Connect

The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930`s, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D`Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation.

Columbia River System Operation Review (U.S.)

1995-11-01T23:59:59.000Z

352

Scientific Opportunities for Monitoring at Environmental Remediation Sites (SOMERS): Integrated Systems-Based Approaches to Monitoring  

SciTech Connect

Through an inter-disciplinary effort, DOE is addressing a need to advance monitoring approaches from sole reliance on cost- and labor-intensive point-source monitoring to integrated systems-based approaches such as flux-based approaches and the use of early indicator parameters. Key objectives include identifying current scientific, technical and implementation opportunities and challenges, prioritizing science and technology strategies to meet current needs within the DOE complex for the most challenging environments, and developing an integrated and risk-informed monitoring framework.

Bunn, Amoret L.; Wellman, Dawn M.; Deeb, Rula A.; Hawley, Elizabeth L.; Truex, Michael J.; Peterson, Mark; Freshley, Mark D.; Pierce, Eric M.; McCord, John; Young, Michael H.; Gilmore, Tyler J.; Miller, Rick; Miracle, Ann L.; Kaback, Dawn; Eddy-Dilek, Carol; Rossabi, Joe; Lee, Michelle H.; Bush, Richard P.; Beam , Paul; Chamberlain, G. M.; Marble, Justin; Whitehurst, Latrincy; Gerdes, Kurt D.; Collazo, Yvette

2012-05-15T23:59:59.000Z

353

Environmental Protection Agency | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Protection Agency Environmental Protection Agency Environmental Protection Agency Selected documents prepared by the Environmental Protection Agency that provide guidance on the NEPA process August 24, 2012 EPA -- Amended Environmental Impact Statement Filing System Guidance Amended Environmental Impact Statement Filing System Guidance for Implementing 40 CFR 1506.9 and 1506.10 of the Council on Environmental Quality's Regulations Implementing the National Environmental Policy Act August 1, 2012 EPA -- Addressing Children's Health through Reviews Conducted Pursuant to the National Environmental Policy Act and Section 309 of the Clean Air Act Addressing Children's Health through Reviews Conducted Pursuant to the National Environmental Policy Act and Section 309 of the Clean Air Act

354

A robust approach for planning electric power systems associated with environmental policy analysis  

Science Journals Connector (OSTI)

In this study, a fractile-based robust stochastic programming (FRSP) method is developed for planning electric power systems under uncertainty. FRSP can tackle uncertainties expressed as possibilistic and probabilistic distributions in constraints and objective function. The developed FRSP is applied to long-term electric power systems planning, where two cases are examined based on different greenhouse gas (GHG) and air-pollutant management policies. During power-generation processes, various losses may affect energy consumption rate, leading to uncertainties in energy conversion efficiency. From a long-term planning point of view, energy demands from multiple end-users may vary due to population increase and economic development. A variety of scenarios associated with different levels of energy conversion efficiency and energy demand are analyzed. Decision variables with p-necessity are useful for managers to sustain and/or modify the decision schemes for energy activities through incorporation of their implicit knowledge. The results obtained can not only be used for generating desired energy resource/service distribution, but also help decision makers identify desired policies for GHG and air-pollutant mitigation with a cost-effective manner.

Y. Zhou; Y.P. Li; G.H. Huang; Y. Zhou

2013-01-01T23:59:59.000Z

355

Environmental monitoring plan  

SciTech Connect

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

Holland, R.C.

1997-02-01T23:59:59.000Z

356

National Environmental Policy Act (NEPA) | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Environmental Management System National Environmental Policy Act (NEPA) National Environmental Policy Act (NEPA) Regulations and Links DOE NEPA Website NEPA Compliance Program...

357

General Engineer/Environmental Engineer/Physical Scientist  

Energy.gov (U.S. Department of Energy (DOE))

The selectee will provide professional advice and assistance in the areas of environmental regulatory compliance, environmental monitoring, environmental management systems, and DOE Orders related...

358

EIS-0251: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0251: Final Environmental Impact Statement EIS-0251: Final Environmental Impact Statement Department of the Navy Final Environmental Impact Statement for a Container System for...

359

Environmental Analysis  

Energy.gov (U.S. Department of Energy (DOE))

Environmental Analysis is used by the Program to quantify the environmental impacts of hydrogen technologies. Specifically, life cycle assessment is used to identify and evaluate the emissions,...

360

Innovative coke oven gas cleaning system for retrofit applications. Quarterly environmental monitoring report No. 3, January 1, 1991--December 31, 1991  

SciTech Connect

Bethlehem Steel Corporation (BSC), in conjunction with the Department of Energy (DOE) is conducting a Clean Coal Technology (CCT) project at its Sparrows Point, Maryland Coke Oven Plant. This project combines several existing technologies into an integrated system for removing impurities from Coke Oven Gas (COG) to make it an acceptable fuel. DOE is providing cost-sharing under a Cooperative Agreement with BSC. This Cooperative Agreement requires BSC to develop and conduct an Environmental Monitoring Plan (EMP) for the Clean Coal Technology project and to report the status of the EMP on a quarterly basis. This report is the third quarterly status report of the EMP. It covers the Environmental Monitoring Plan activities for the full year of 1991 from January 1, 1991 through December 31, 1991, including the forth quarter. See Sections 2, 3 and 4 for status reports of the Project Installation and Commissioning, the Environmental Monitoring activities and the Compliance Monitoring results for the period. Section 5 contains a list of Compliance Reports submitted to regulatory agencies during the period. The EMP describes in detail the environmental monitoring activities to be performed during the project execution. The purpose of the EMP is to: (1) document the extent of compliance of monitoring activities, i.e. those monitoring required to meet permit requirements, (2) confirm the specific impacts predicted in the National Environmental Policy Act documentation, and (3) establish an information base for the assessment of the environmental performance of the technology demonstrated by the project.

Not Available

1992-10-16T23:59:59.000Z

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Environmental Justice Five-Year Implementation Plan | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Team Environmental Justice Environmental Management System Applied Studies and Technology Post-Closure Benefits Property Records Management Stakeholder Relations...

362

Workplace Responsibilities System Approved by Board of Governors on December 17, 2004 Workplace Safety and Environmental Protection Page 1 of 10  

E-Print Network (OSTI)

safety performance is the creation of a culture that secures involvement and participation at all levels Safety and Environmental Protection Page 1 of 10 WORKPLACE RESPONSIBILITIES SYSTEM 1 Abstract The safety of Saskatchewan employee obligations according to The Occupational Health and Safety Act and Regulations. Health

Saskatchewan, University of

363

Fingerprinting of bed sediment in theTay Estuary, Scotland: an environmental magnetism approach Hydrology and Earth System Sciences, 6(6), 10071016 (2002) EGS  

E-Print Network (OSTI)

Fingerprinting of bed sediment in theTay Estuary, Scotland: an environmental magnetism approach 1007 Hydrology and Earth System Sciences, 6(6), 1007­1016 (2002) © EGS Fingerprinting of bed sediment 9AL, Scotland Email of corresponding author: p.a.jenkins@dundee.ac.uk Abstract Sediment

Paris-Sud XI, Université de

364

In Clarke KC, Parks BE, and Crane MP (eds) 2000. Geographic Information Systems and Environmental Modeling. New York: Longman & Co. (in press)  

E-Print Network (OSTI)

and ecosystems, of atmospheric circulation and industrial pollution, of fisheries under the impact of different and ecological systems, natural hazards, ecosystems management issues, are all popular themes. Environmental, oceanic, terrestrial and socioeconomic. Because the environment is a synthesis of all these domains

Clarke, Keith

365

Environmental proteomics of microbial plankton in a highly productive coastal upwelling system  

SciTech Connect

Metaproteomics is one of a suite of new approaches providing insights into the activities of microorganisms in natural environments. Proteins, the final products of gene expression, indicate cellular priorities, taking into account both transcriptional and posttranscriptional control mechanisms that control adaptive responses. Here, we report the proteomic composition of the o 1.2 lm fraction of a microbial community from Oregon coast summer surface waters, detected with two-dimensional liquid chromatography coupled with electrospray tandem mass spectrometry. Spectra corresponding to proteins involved in protein folding and biosynthesis, transport, and viral capsid structure were the most frequently detected. A total of 36% of all the detected proteins were best matches to the SAR11 clade, and other abundant coastal microbial clades were also well represented, including the Roseobacter clade (17%), oligotrophic marine gammaproteobacteria group (6%), OM43 clade (1%). Viral origins were attributed to 2.5% of proteins. In contrast to oligotrophic waters, phosphate transporters were not highly detected in this nutrient-rich system. However, transporters for amino acids, taurine, polyamines and glutamine synthetase were among the most highly detected proteins, supporting predictions that carbon and nitrogen are more limiting than phosphate in this environment. Intriguingly, one of the highly detected proteins was methanol dehydrogenase originating from the OM43 clade, providing further support for recent reports that the metabolism of one-carbon compounds by these streamlined methylotrophs might be an important feature of coastal ocean biogeochemistry.

Sowell, Sarah [Oregon State University, Corvallis; Abraham, Paul E [ORNL; Shah, Manesh B [ORNL; Verberkmoes, Nathan C [ORNL; Smith, Daniel [Oregon State University, Corvallis; Barofsky, Douglas [Oregon State University, Corvallis; Giovannoni, Stephen [Oregon State University, Corvallis

2011-01-01T23:59:59.000Z

366

Environmental Participation and Environmental Motivation  

E-Print Network (OSTI)

why do people act environmentally and what are the barriersWillingness to pay for environmental protection in Germany:are more likely to be environmentally engaged. However, the

Torgler, Benno; García-Valiñas, María A.; Macintyre, Alison

2009-01-01T23:59:59.000Z

367

MasterEnvironmental Engineering Department of Civil, environmental  

E-Print Network (OSTI)

management (including also earth observation), urban water management, environmental systems design and waste students major in two core areas of environmental engineering out of the following: water resource core areas: Water resource management (including also earth observation), urban water management

Giger, Christine

368

WIPP Documents - Environmental Management and Sustainability  

NLE Websites -- All DOE Office Websites (Extended Search)

Management and Sustainability WIPP Environmental Policy DOEWIPP 04-3310 Rev 4 Environmental Management System Description DOEWIPP-05-3318 Rev 5 WIPP Site Sustainability Plan WIPP...

369

Nuclear proliferation and civilian nuclear power. Report of the Nonproliferation Alternative Systems Assessment Program. Volume VI. Safety and environmental considerations for licensing  

SciTech Connect

This volume of the Nonproliferation Alternative Systems Assessment Program report addresses safety and environmental considerations in licensing the principal alternative nuclear reactors and fuel cycles in the United States for large-scale commercial nuclear power plants. In addition, this volume examines the safety and environmental considerations for licensing fuel service centers. These centers, which have been proposed for controlling sensitive fuel-cycle facilities and special nuclear materials, would contain a combination of such facilities as reprocessing plants, fabrication plants, and reactors. For this analysis, two fuel service center concepts were selected - one with power - generating capability and one without.

Not Available

1980-06-01T23:59:59.000Z

370

Substrate and environmental controls on microbial assimilation of soil organic carbon: a framework for Earth System Models  

SciTech Connect

Microbial assimilation of soil organic carbon is one of the fundamental processes of global carbon cycling and it determines the magnitude of microbial biomass in soils. Mechanistic understanding of microbial assimilation of soil organic carbon and its controls is important for to improve Earth system models ability to simulate carbon-climate feedbacks. Although microbial assimilation of soil organic carbon is broadly considered to be an important parameter, it really comprises two separate physiological processes: one-time assimilation efficiency and time-dependent microbial maintenance energy. Representing of these two mechanisms is crucial to more accurately simulate carbon cycling in soils. In this study, a simple modeling framework was developed to evaluate the substrate and environmental controls on microbial assimilation of soil organic carbon using a new term: microbial annual active period (the length of microbes remaining active in one year). Substrate quality has a positive effect on microbial assimilation of soil organic carbon: higher substrate quality (lower C:N ratio) leads to higher ratio of microbial carbon to soil organic carbon and vice versa. Increases in microbial annual active period from zero stimulate microbial assimilation of soil organic carbon; however, when microbial annual active period is longer than an optimal threshold, increasing this period decreases microbial biomass. The simulated ratios of soil microbial biomass to soil organic carbon are reasonably consistent with a recently compiled global dataset at the biome-level. The modeling framework of microbial assimilation of soil organic carbon and its controls developed in this study offers an applicable ways to incorporate microbial contributions to the carbon cycling into Earth system models for simulating carbon-climate feedbacks and to explain global patterns of microbial biomass.

Xu, Xiaofeng [ORNL] [ORNL; Schimel, Joshua [University of California, Santa Barbara] [University of California, Santa Barbara; Thornton, Peter E [ORNL] [ORNL; Song, Xia [ORNL] [ORNL; Yuan, Fengming [ORNL] [ORNL; Goswami, Santonu [ORNL] [ORNL

2014-01-01T23:59:59.000Z

371

State and national energy environmental risk analysis systems for underground injection control. Final report, April 7, 1992--May 31, 1995  

SciTech Connect

The purpose of this effort is to develop and demonstrate the concept of a national Energy and Environmental Risk Analysis System that could support DOE policy analysis and decision-making. That effort also includes the development and demonstration of a methodology for assessing the risks of groundwater contamination from underground injection operations. EERAS is designed to enhance DOE`s analytical capabilities by working with DOE`s existing resource analysis models for oil and gas. The full development of EERAS was not planned as part of this effort. The design and structure for the system were developed, along with interfaces that facilitate data input to DOE`s other analytical tools. The development of the database for EERAS was demonstrated with the input of data related to underground injection control, which also supported the risk assessment being performed. The utility of EERAS has been demonstrated by this effort and its continued development is recommended. Since the absolute risk of groundwater contamination due to underground injection is quite low, the risk assessment methodology focuses on the relative risk of groundwater contamination. The purpose of this methodology is to provide DOE with an enhanced understanding of the relative risks posed nationwide as input to DOE decision-making and resource allocation. Given data problems encountered, a broad assessment of all oil reservoirs in DOE`s resource database was not possible. The methodology was demonstrated using a sample of 39 reservoirs in 15 states. While data difficulties introduce substantial uncertainties, the results found are consistent with expectations and with prior analyses. Therefore the methodology for performing assessments appears to be sound. Recommendations on steps that can be taken to resolve uncertainties or obtain improved data are included in the report.

NONE

1995-05-01T23:59:59.000Z

372

Screening study for evaluation of the potential for system 80+ to consume excess plutonium - Volume 2. Final report  

SciTech Connect

As part of the U.S. effort to evaluate technologies offering solutions for the safe disposal or utilization of surplus nuclear materials, the fiscal year 1993 Energy and Water Appropriations legislation provided the Department of Energy (DOE) the necessary funds to conduct multi-phased studies to determine the technical feasibility of using reactor technologies for the triple mission of burning weapons grade plutonium, producing tritium for the existing smaller weapons stockpile, and generating commercial electricity. DOE limited the studies to five advanced reactor designs. Among the technologies selected is the ABB-Combustion Engineering (ABB-CE) System 80+. The DOE study, currently in Phase ID, is proceeding with a more detailed evaluation of the design`s capability for plutonium disposition.

Not Available

1994-04-30T23:59:59.000Z

373

Modeling of integrated environmental control systems for coal-fired power plants. Technical progress report, [June 1, 1989--September 30, 1989  

SciTech Connect

The general goal of this research project is to enhance, and transfer to DOE, a new computer simulation model for analyzing the performance and cost of environmental control systems for coal-fired power plants. Systems utilizing pre-combustion, combustion, or post-combustion control methods, individually or in combination, may be considered. A unique capability of this model is the probabilistic representation of uncertainty in model input parameters. This stochastic simulation capability allows the performance and cost of environmental control systems to be quantified probabilistically, accounting for the interactions among all uncertain process and economic parameters. This method facilitates more rigorous comparisons between conventional and advanced clean coal technologies promising improved cost and/or effectiveness for SO{sub 2} and NO{sub x} removal. Detailed modeling of several pre-combustion and post-combustion processes of interest to DOE/PETC have been selected for analysis as part of this project.

Rubin, E.S.

1989-10-01T23:59:59.000Z

374

Systems engineering approach to environmental risk management: A case study of depleted uranium at test area C-64, Eglin Air Force Base, Florida. Master`s thesis  

SciTech Connect

Environmental restoration is an area of concern in an environmentally conscious world. Much effort is required to clean up the environment and promote environmentally sound methods for managing current land use. In light of the public consciousness with the latter topic, the United States Air Force must also take an active role in addressing these environmental issues with respect to current and future USAF base land use. This thesis uses the systems engineering technique to assess human health risks and to evaluate risk management options with respect to depleted uranium contamination in the sampled region of Test Area (TA) C-64 at Eglin Air Force Base (AFB). The research combines the disciplines of environmental data collection, DU soil concentration distribution modeling, ground water modeling, particle resuspension modeling, exposure assessment, health hazard assessment, and uncertainty analysis to characterize the test area. These disciplines are required to quantify current and future health risks, as well as to recommend cost effective ways to increase confidence in health risk assessment and remediation options.

Carter, C.M.; Fortmann, K.M.; Hill, S.W.; Latin, R.M.; Masterson, E.J.

1994-12-01T23:59:59.000Z

375

Environmental Management System Plan  

E-Print Network (OSTI)

and the implementation of sustainable building designs andand reuse Sustainable and high-performance building design

Fox, Robert

2009-01-01T23:59:59.000Z

376

Environmentally Friendly Coolant System  

SciTech Connect

Energy reduction through the use of the EFCS is most improved by increasing machining productivity. Throughout testing, nearly all machining operations demonstrated less land wear on the tooling when using the EFCS which results in increased tool life. These increases in tool life advance into increased productivity. Increasing productivity reduces cycle times and therefore reduces energy consumption. The average energy savings by using the EFCS in these machining operations with these materials is 9%. The advantage for end milling stays with flood coolant by about 6.6% due to its use of a low pressure pump. Face milling and drilling are both about 17.5% less energy consumption with the EFCS than flood coolant. One additional result of using the EFCS is improved surface finish. Certain machining operations using the EFCS result in a smoother surface finish. Applications where finishing operations are required will be able to take advantage of the improved finish by reducing the time or possibly eliminating completely one or more finishing steps and thereby reduce their energy consumption. Some machining operations on specific materials do not show advantages for the EFCS when compared to flood coolants. More information about these processes will be presented later in the report. A key point to remember though, is that even with equivalent results, the EFCS is replacing petroleum based coolants whose production produces GHG emissions and create unsafe work environments.

David Jackson Principal Investigator

2011-11-08T23:59:59.000Z

377

RM Environmental Review (NEPA)  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Review-NEPA Environmental Review-NEPA Categorical exclusions are posted here to promote transparency and openness. Some actions may have environmental impacts that require an environmental assessment and a detailed analysis to determine the extent and severity of the impacts. For actions that have significant impacts or consequences to the environment or human health, RM prepares environmental impact statements. Environmental Impact Statements-EIS Estes-Flatiron Transmission Line Rebuild Project Granby Pumping Plant-Windy Gap Transmission Line Rebuild Project Hermosa West Wind Energy Project Maintenance and Vegetation Management along Existing Western TransmissionLine Rights of Way on National Forest System Lands in Colorado, Utah, Nebraska Platte River Cooperative Agreement PEIS, NE, CO and WY, DOE/EIS-0295 (Cooperating Agency)

378

Preliminary Screening Analysis for the Environmental Risk Evaluation System: Task 2.1.1: Evaluating Effects of Stressors – Fiscal Year 2010 Progress Report: Environmental Effects of Marine and Hydrokinetic Energy  

SciTech Connect

Possible environmental effects of marine and hydrokinetic (MHK) energy development are not well understood, and yet regulatory agencies are required to make decisions in spite of substantial uncertainty about environmental impacts and their long-term effects. An understanding of risk associated with likely interactions between MHK installations and aquatic receptors, including animals, habitats, and ecosystems, can help reduce the level of uncertainty and focus regulatory actions and scientific studies on interactions of most concern. As a first step in developing the Pacific Northwest National Laboratory (PNNL) Environmental Risk Evaluation System (ERES), PNNL scientists conducted a preliminary risk screening analysis on three initial MHK cases - a tidal project in Puget Sound using Open Hydro turbines, a wave project off the coast of Oregon using Ocean Power Technologies point attenuator buoys, and a riverine current project in the Mississippi River using Free Flow turbines. Through an iterative process, the screening analysis revealed that top-tier stressors in all three cases were the effects of the dynamic physical presence of the device (e.g., strike), accidents, and effects of the static physical presence of the device (e.g., habitat alteration). Receptor interactions with these stressors at the four highest tiers of risk were dominated by marine mammals (cetaceans and pinnipeds) and birds (diving and non-diving); only the riverine case (Free Flow) included different receptors in the third tier (fish) and the fourth tier (benthic invertebrates). Although this screening analysis provides a preliminary analysis of vulnerability of environmental receptors to stressors associated with MHK installations, probability analysis, especially of risk associated with chemical toxicity and accidents such as oil spills or lost gear, will be necessary to further understand high-priority risks. Subject matter expert review of this process and results is required and is planned for the first quarter of FY11. Once expert review is finalized, the screening analysis phase of ERES will be complete.

Anderson, Richard M.; Copping, Andrea E.; Van Cleve, Frances B.

2010-11-15T23:59:59.000Z

379

numerical models & information Systems, Nice: France (2013)" Environmental impact for offshore wind farms: Geolocalized Life Cycle Assessment (LCA) approach  

E-Print Network (OSTI)

Abstract. This paper presents an approach for Environmental Impact Assessment through the use of geolocalized LCA approach, for fixed and floating offshore wind farms. This work was undertaken within the EUsponsored EnerGEO project, aiming at providing a versatile modeling platform for stakeholders allowing calculation, forecasting and monitoring of environmental impacts of different sources of energy. This paper described the geolocalized LCA approach, and its use for the evaluation of environmental impacts of wind energy. The effects of offshore wind farms on global environnemental impacts are evaluated though the LCA approach. It takes into account the type of wind farm, the construction phase, all technical aspects, the operation and maintenance scheme and the decommissioning. It also includes geolocalized information such as wind resources, bathymetry, accessibility … Environmental impact parameters are accessible through a web service helping the decision makers in assessing the environnemental impacts. 1

Catherine Guermont; Lionel Ménard; Isabelle Blanc

2013-01-01T23:59:59.000Z

380

Advanced Turbine System (ATS): Task 1, System scoping and feasibility study. Final report  

SciTech Connect

Present GT(Gas Turbine) Systems are available to achieve 52% (LHV) thermal efficiencies, plants in construction will be capable of 54%, and the goal of this study is to identify incentives, technical issues, and resource requirements to develop natural gas-and coal-compatible ATS which would have a goal of 60% or greater based on LHV. The prime objective of this project task is to select a natural gas-fired ATS (Advanced Turbine System) that could be manufactured and marketed should development costs not be at issue with the goals of: (1) Coal of electricity 10% below 1991 vintage power plants in same market class and size. (2) Expected performance 60% efficiency and higher, (3) Emission levels, NO{sub x} < 10 ppM (0.15 lb/MW-h), CO < 20 ppM (0.30 lb/MW-h), and UHC < 20 ppM (0.30 lb/MW-h). ABB screening studies have identified the gas-fueled combined cycle as the most promising full scale solution to achieve the set goals for 1988--2002. This conclusion is based on ABB`s experience level, as well as the multi-step potential of the combined cycle process to improve in many component without introducing radical changes that might increase costs and lower RAM. The technical approach to achieve 60% or better thermal efficiency will include increased turbine inlet temperatures, compressor intercooling, as well a improvements in material, turbine cooling technology and the steam turbine. Use of improved component efficiencies will achieve gas-fired cycle performance of 61.78%. Conversion to coal-firing will result in system performance of 52.17%.

van der Linden, S.

1993-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Environmental Monitoring Plan  

SciTech Connect

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

1993-07-01T23:59:59.000Z

382

Environmental Assessments  

Energy.gov (U.S. Department of Energy (DOE))

The documents included on the Environmental Compliance Division webpages have been posted to comply with applicable environmental requirements as part of LPO’s due diligence process for issuing a...

383

Agricultural Environmental  

E-Print Network (OSTI)

Agricultural Policy / Environmental eXtender Model Theoretical Documentation Version 0806 December 2012 #12;2 Agricultural Policy/Environmental eXtender Model Theoretical Documentation Version 0806 J............................................................................................................................. 11 Air Temperature and Solar Radiation

384

Agricultural Environmental  

E-Print Network (OSTI)

Agricultural Policy / Environmental eXtender Model Theoretical Documentation Version 0604 BREC Report # 2008-17 June 2008 #12;2 Agricultural Policy/Environmental eXtender Model Theoretical............................................................................................................................. 11 Air Temperature and Solar Radiation

385

Environmental Justice  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy (DOE) is committed to promoting environmental justice in all its activities in keeping with Executive Order (EO) 12898: Federal Actions to Address Environmental Justice in...

386

Environmental Justice  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy (DOE) is committed to promoting environmental justice in all its activities in keeping with Executive Order (EO) 12898: Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations.

387

Economical and environmental assessment of an optimized solar cooling system for a medium-sized benchmark office building in Los Angeles, California  

Science Journals Connector (OSTI)

This paper presents a systematic energetic, economical, and environmental assessment on a solar cooling system for a medium-sized office building in Los Angeles, California by means of system modeling. The studied solar cooling system primarily consists of evacuated tube solar collectors, a hot water storage tank, a single-effect LiBr–H2O absorption chiller, and a gas-fired auxiliary heater. System performance optimization and sensitivity analysis were conducted by varying two major parameters (i.e. storage tank volume and collector area). The results suggest that a trade-off exists between economic performance indicated by the equivalent uniform annual cost (EUAC) and the energetic/environmental performance indicated by the solar fraction and CO2 reduction percentage, respectively. The cost of carbon footprint reduction was defined and served as an indicator for the overall system performance. Based on this indicator, the optimal system design could be found for a solar cooling system. The approach adapted in this study can be applied to other buildings located in different climate zones to reveal the cost and benefits of solar cooling technologies and facilitate decision-making.

Yin Hang; Ming Qu; Fu Zhao

2011-01-01T23:59:59.000Z

388

ENVIRONMENTAL ENGINEERING  

E-Print Network (OSTI)

engineering covers a wide range of critical services, from designing water and wastewater treatment facilitiesENVIRONMENTAL ENGINEERING www.cee.pdx.edu What do environmental engineers do? Civil and Environmental Engineering (CEE) is an exciting, challenging, and dynamic field that is critical to our quality

389

Quantifying the Environmental Impact of an Integrated Human/Industrial-Natural System Using Life Cycle Assessment; A Case Study on a Forest and Wood Processing Chain  

Science Journals Connector (OSTI)

Quantifying the Environmental Impact of an Integrated Human/Industrial-Natural System Using Life Cycle Assessment; A Case Study on a Forest and Wood Processing Chain ... For example a forest provides wood but can also emit quantities of NO, CO2, and other compounds, requires solar energy, and occupies a piece of land. ... The net electricity generated is a product of the wood disposal through burning. ...

Thomas Schaubroeck; Rodrigo A. F. Alvarenga; Kris Verheyen; Bart Muys; Jo Dewulf

2013-11-06T23:59:59.000Z

390

Aligning National Environmental Policy Act Process with Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Aligning National Environmental Policy Act Process with Aligning National Environmental Policy Act Process with Environmental Management Systems Aligning National Environmental Policy Act Process with Environmental Management Systems Aligning National Environmental Policy Act Process with Environmental Management Systems (EMS) This is a guidebook for NEPA and EMS practitioners that identifies elements of an EMS that can improve NEPA implementation. Alignment of NEPA and EMS further enhances both NEPA's goals and the sustainability goals laid out in the Executive Order 13423: " to create and maintain conditions, under which humans and nature can exist in productive harmony, that permit fulfilling the social, economic, and other requirements of the present and future generations of Americans." CEQ NEPA & EMS Guide Overview

391

Aligning National Environmental Policy Act Process with Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Aligning National Environmental Policy Act Process with Aligning National Environmental Policy Act Process with Environmental Management Systems Aligning National Environmental Policy Act Process with Environmental Management Systems Aligning National Environmental Policy Act Process with Environmental Management Systems (EMS) This is a guidebook for NEPA and EMS practitioners that identifies elements of an EMS that can improve NEPA implementation. Alignment of NEPA and EMS further enhances both NEPA's goals and the sustainability goals laid out in the Executive Order 13423: " to create and maintain conditions, under which humans and nature can exist in productive harmony, that permit fulfilling the social, economic, and other requirements of the present and future generations of Americans." CEQ NEPA & EMS Guide Overview

392

Sandia National Laboratories: About Sandia: Environmental Responsibility  

NLE Websites -- All DOE Office Websites (Extended Search)

Responsibility Responsibility Environmental Management System Pollution Prevention About Environmental Responsibility Environmental responsibility workers at Sandia Long-term management aimed at preserving and enhancing the quality of the environment has evolved at Sandia National Laboratories for more than 50 years. Recycling, establishing community environmental partnerships, incorporating sustainable design in new and renovated facilities, and environmental restoration are all integral parts of Sandia's environmental stewardship. Sandia also partners with the Department of Energy to improve public participation in environmental issues, such as the implementation of the National Environmental Policy Act (NEPA) and Long-term Stewardship for environmental restoration. Participation in community organizations and

393

(Environmental technology)  

SciTech Connect

The traveler participated in a conference on environmental technology in Paris, sponsored by the US Embassy-Paris, US Environmental Protection Agency (EPA), the French Environmental Ministry, and others. The traveler sat on a panel for environmental aspects of energy technology and made a presentation on the potential contributions of Oak Ridge National Laboratory (ORNL) to a planned French-American Environmental Technologies Institute in Chattanooga, Tennessee, and Evry, France. This institute would provide opportunities for international cooperation on environmental issues and technology transfer related to environmental protection, monitoring, and restoration at US Department of Energy (DOE) facilities. The traveler also attended the Fourth International Conference on Environmental Contamination in Barcelona. Conference topics included environmental chemistry, land disposal of wastes, treatment of toxic wastes, micropollutants, trace organics, artificial radionuclides in the environment, and the use biomonitoring and biosystems for environmental assessment. The traveler presented a paper on The Fate of Radionuclides in Sewage Sludge Applied to Land.'' Those findings corresponded well with results from studies addressing the fate of fallout radionuclides from the Chernobyl nuclear accident. There was an exchange of new information on a number of topics of interest to DOE waste management and environmental restoration needs.

Boston, H.L.

1990-10-12T23:59:59.000Z

394

NETL: Global Environmental Benefits  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Environmental Benefits Global Environmental Benefits Gasification Systems Global Environmental Benefits Environmental performance for future energy production systems is a much greater factor as emission standards tighten in the United States and worldwide. The outstanding environmental performance of gasification systems makes it an excellent technology for the clean production of electricity and other products. In addition, the reduction of CO2 emissions is one of the major challenges facing industry in response to global climate change. Other countries with coal reserves might potentially import technologies developed in the United States to enable low-cost gasification with carbon capture and EOR or sequestration. Not only will this benefit the U.S. gasification technology industry, but it will also result in a global environmental benefit through more affordable control of greenhouse gases (GHGs). See the U.S. Environmental Protection Agency (EPA) link below for a summary of the impact of fossil fuels without carbon capture on CO2 emissions, on the GHG contributions of different countries, and of the projected impact of developing countries to 2030:

395

NETL: Site Environmental Quality  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Environmental Quality Site Environmental Quality About NETL Site Environmental Quality - Certified to ISO 14001:2004 Questions about NETL's Environment, Safety and Health Management System may be directed to Michael Monahan, 304-285-4408, michael.monahan@netl.doe.gov. NETL has implemented an Environment, Safety and Health (ES&H) Management System, based on DOE's Integrated Safety Management System, the International Organization for Standardization (ISO) 14000 series, and the Occupational Health and Safety Assessment (OHSAS) 18000 series. While the original scope of the ES&H Management System included the Morgantown and Pittsburgh sites, in fiscal year 2010, the Albany site was incorporated into the existing ES&H Management System. In addition, all three sites underwent ISO 14001:2004 recertification audits and Morgantown and

396

Elements of an environmental decision support system for seasonal wetland salt management in a river basin subjected to water quality regulation  

SciTech Connect

Seasonally managed wetlands in the Grasslands Basin on the west-side of California's San Joaquin Valley provide food and shelter for migratory wildfowl during winter months and sport for waterfowl hunters during the annual duck season. Surface water supply to these wetlands contain salt which, when drained to the San Joaquin River during the annual drawdown period, can negatively impact water quality and cause concern to downstream agricultural riparian water diverters. Recent environmental regulation, limiting discharges salinity to the San Joaquin River and primarily targeting agricultural non-point sources, now also targets return flows from seasonally managed wetlands. Real-time water quality management has been advocated as a means of continuously matching salt loads discharged from agricultural, wetland and municipal operations to the assimilative capacity of the San Joaquin River. Past attempts to build environmental monitoring and decision support systems (EDSS's) to implement this concept have enjoyed limited success for reasons that are discussed in this paper. These reasons are discussed in the context of more general challenges facing the successful implementation of a comprehensive environmental monitoring, modelling and decision support system for the San Joaquin River Basin.

Quinn, N.W.T.

2009-06-01T23:59:59.000Z

397

Environmental Report 2007  

SciTech Connect

The purposes of the 'Lawrence Livermore National Laboratory Environmental Report 2007' are to record Lawrence Livermore National Laboratory's (LLNL's) compliance with environmental standards and requirements, describe LLNL's environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites--the Livermore site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL's Environmental Protection Department. Submittal of the report satisfies requirements under DOE Order 231.1A, Environmental Safety and Health Reporting, and DOE Order 5400.5, Radiation Protection of the Public and Environment. The report is distributed electronically and is available at https://saer.lln.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning in 1994 are also on the website. Some references in the electronic report text are underlined, which indicates that they are clickable links. Clicking on one of these links will open the related document, data workbook, or website that it refers to. The report begins with an executive summary, which provides the purpose of the report and an overview of LLNL's compliance and monitoring results. The first three chapters provide background information: Chapter 1 is an overview of the location, meteorology, and hydrogeology of the two LLNL sites; Chapter 2 is a summary of LLNL's compliance with environmental regulations; and Chapter 3 is a description of LLNL's environmental programs with an emphasis on the Environmental Management System including pollution prevention. The majority of the report covers LLNL's environmental monitoring programs and monitoring data for 2007: effluent and ambient air (Chapter 4); waters, including wastewater, storm water runoff, surface water, rain, and groundwater (Chapter 5); and terrestrial, including soil, sediment, vegetation, foodstuff, ambient radiation, and special status wildlife and plants (Chapter 6). Complete monitoring data, which are summarized in the body of the report, are provided in Appendix A. The remaining three chapters discuss the radiological impact on the public from LLNL operations (Chapter 7), LLNL's groundwater remediation program (Chapter 8), and quality assurance for the environmental monitoring programs (Chapter 9). The report uses Systeme International units, consistent with the federal Metric Conversion Act of 1975 and Executive Order 12770, Metric Usage in Federal Government Programs (1991). For ease of comparison to environmental reports issued prior to 1991, dose values and many radiological measurements are given in both metric and U.S. customary units. A conversion table is provided in the glossary.

Mathews, S; Gallegos, G; Berg, L L; Bertoldo, N A; Campbell, C G; Cerruti, S; Doman, J L; Ferry, L S; Grayson, A R; Jones, H E; Kumamoto, G; Larson, J; MacQueen, D H; Paterson, L; Revelli, M A; Ridley, M; Rueppel, D; Wegrecki, A M; Wilson, K; Woollett, J

2008-09-24T23:59:59.000Z

398

Environmental Stewardship  

NLE Websites -- All DOE Office Websites (Extended Search)

businesses for environmental work The companies chosen are Terranear PMC, Navarro Research and Engineering, Inc. and Portage, Inc - 92313 Los Alamos National Laboratory sits...

399

Environmental Review  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental-Review Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance...

400

EMSL - environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

environmental en Diffusional Motion of Redox Centers in Carbonate Electrolytes . http:www.emsl.pnl.govemslwebpublicationsdiffusional-motion-redox-centers-carbonate-electrolyte...

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

DOE plutonium disposition study: Analysis of existing ABB-CE Light Water Reactors for the disposition of weapons-grade plutonium. Final report  

SciTech Connect

Core reactivity and basic fuel management calculations were conducted on the selected reactors (with emphasis on the System 80 units as being the most desirable choice). Methods used were identical to those reported in the Evolutionary Reactor Report. From these calculations, the basic mission capability was assessed. The selected reactors were studied for modification, such as the addition of control rod nozzles to increase rod worth, and internals and control system modifications that might also be needed. Other system modifications studied included the use of enriched boric acid as soluble poison, and examination of the fuel pool capacities. The basic geometry and mechanical characteristics, materials and fabrication techniques of the fuel assemblies for the selected existing reactors are the same as for System 80+. There will be some differences in plutonium loading, according to the ability of the reactors to load MOX fuel. These differences are not expected to affect licensability or EPA requirements. Therefore, the fuel technology and fuel qualification sections provided in the Evolutionary Reactor Report apply to the existing reactors. An additional factor, in that the existing reactor availability presupposes the use of that reactor for the irradiation of Lead Test Assemblies, is discussed. The reactor operating and facility licenses for the operating plants were reviewed. Licensing strategies for each selected reactor were identified. The spent fuel pool for the selected reactors (Palo Verde) was reviewed for capacity and upgrade requirements. Reactor waste streams were identified and assessed in comparison to uranium fuel operations. Cost assessments and schedules for converting to plutonium disposition were estimated for some of the major modification items. Economic factors (incremental costs associated with using weapons plutonium) were listed and where possible under the scope of work, estimates were made.

Not Available

1994-06-01T23:59:59.000Z

402

A pseudo-optimal inexact stochastic interval T2 fuzzy sets approach for energy and environmental systems planning under uncertainty: A case study for Xiamen City of China  

Science Journals Connector (OSTI)

Abstract In this study, a new Pseudo-optimal Inexact Stochastic Interval Type-2 Fuzzy Sets Linear Programming (PIS-IT2FSLP) energy model is developed to support energy system planning and environment requirements under uncertainties for Xiamen City. The PIS-IT2FSLP model is based on an integration of interval Type 2 (T2) Fuzzy Sets (FS) boundary programming and stochastic linear programming techniques, enables it to have robust abilities to the tackle uncertainties expressed as T2 FS intervals and probabilistic distributions within a general optimization framework. This new model can sophisticatedly facilitate system analysis of energy supply and energy conversion processes, and environmental requirements as well as provide capacity expansion options with multiple periods. The PIS-IT2FSLP model was applied to a real case study of Xiamen energy systems. Based on a robust two-step solution algorithm, reasonable solutions have been obtained, which reflect tradeoffs between economic and environmental requirements, and among seasonal volatility energy demands of the right hand side constraints of Xiamen energy system. Thus, the lower and upper solutions of PIS-IT2FSLP would then help local energy authorities adjust current energy patterns, and discover an optimal energy strategy for the development of Xiamen City.

L. Jin; G.H. Huang; Y.R. Fan; L. Wang; T. Wu

2015-01-01T23:59:59.000Z

403

snox.p65  

NLE Websites -- All DOE Office Websites (Extended Search)

ABB ENVIRONMENTAL SYSTEMS SNOX ABB ENVIRONMENTAL SYSTEMS SNOX TM FLUE GAS CLEANING DEMONSTRATION PROJECT ABB ENVIRONMENTAL SYSTEMS PROJECT PERFORMANCE SUMMARY CLEAN COAL TECHNOLOGY DEMONSTRATION PROGRAM JUNE 1999 DOE/FE-0395 Disclaimer This report was prepared using publically available information, including the Final Technical Report and other reports prepared pursuant to a cooperative agreement partially funded by the U.S. Department of Energy. Neither the United States Government nor any agency, employee, contractor, or representative thereof, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe upon privately

404

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INEEL/EXT-04-02423 INEEL/EXT-04-02423 ABB SCADA/EMS System INEEL Baseline Summary Test Report J. R. Davidson M. R. Permann B. L. Rolston S. J. Schaeffer November 2004 Prepared by: Idaho National Engineering and Environmental Laboratory INEEL/EXT-04-02423 ABB SCADA/EMS System INEEL Baseline Summary Test Report J. R. Davidson M. R. Permann B. L. Rolston S. J. Schaeffer November 2004 Idaho National Engineering and Environmental Laboratory INEEL National Security Division Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Office of Energy Assurance Under DOE Idaho Operations Office Contract DE-AC07-99ID13727 ABB SCADA/EMS System INEEL Baseline Summary Test Report INEEL/EXT-04-02423 November 2004 ABSTRACT The Idaho National Engineering and Environmental Laboratory

405

Advanced turbine systems: Studies and conceptual design  

SciTech Connect

The ABB selection for the Advanced Turbine System (ATS) includes advanced developments especially in the hot gas path of the combustion turbine and new state-of-the-art units such as the steam turbine and the HRSG. The increase in efficiency by more than 10% multiplicative compared to current designs will be based on: (1) Turbine Inlet Temperature Increase; (2) New Cooling Techniques for Stationary and Rotating Parts; and New Materials. Present, projected component improvements that will be introduced with the above mentioned issues will yield improved CCSC turbine performance, which will drive the ATS selected gas-fired reference CC power plant to 6 % LHV or better. The decrease in emission levels requires a careful optimization of the cycle design, where cooling air consumption has to be minimized. All interfaces of the individual systems in the complete CC Plant need careful checks, especially to avoid unnecessary margins in the individual designs. This study is an important step pointing out the feasibility of the ATS program with realistic goals set by DOE, which, however, will present challenges for Phase II time schedule of 18 months. With the approach outlined in this study and close cooperation with DOE, ATS program success can be achieved to deliver low emissions and low cost of electricity by the year 2002. The ABB conceptual design and step approach will lead to early component demonstration which will help accelerate the overall program objectives.

van der Linden, S.; Gnaedig, G.; Kreitmeier, F.

1993-11-01T23:59:59.000Z

406

DOE/EA-1616: Environmental Assessment for Carbon Research Center Project at Southern Company Services' Power Systems Development Facility near Wilsonville, Alabama (DOE/EA-1616) (9/2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 16 CARBON RESEARCH CENTER PROJECT AT SOUTHERN COMPANY SERVICES' POWER SYSTEMS DEVELOPMENT FACILITY NEAR WILSONVILLE, ALABAMA FINAL ENVIRONMENTAL ASSESSMENT U.S. DEPARTMENT OF ENERGY Office of Fossil Energy National Energy Technology Laboratory SEPTEMBER 2008 COVER SHEET Responsible Agency: U.S. Department of Energy Title: Carbon Research Center Project, Draft Environmental Assessment (DOE/EA- 1616) Location: Southern Company Services' Power Systems Development Facility near Wilsonville, Alabama Contact: For further information about this Environmental Assessment, contact: Roy Spears, Document Manager National Energy Technology Laboratory

407

Environmental Engineering  

E-Print Network (OSTI)

and human origins. Civil and Environmental Engineers create, con- struct, and manage the infrastructure water and air pollution as well as industrial and hazardous waste management. They monitor the quality, construc- tion, transportation, environmental engineering, and water resources. The Structural Engineering

Wang, Hai

408

Photovoltaic low power systems and their environmental impact:Yuma, Arizona, U.S.A. case study and projections for Mexicali, Mexico  

Science Journals Connector (OSTI)

Abstract This article presents a proposal for the implementation of photovoltaic systems in homes located in Mexicali, Mexico. With exhibition of new insulation and different consumption characteristics. The photovoltaic low power system is proposed as a type of electrical supply that helps in reducing the environmental impact of generating energy by burning fossil fuels. A photovoltaic system installed in the city of Yuma, Arizona in the United States, which supplies the electrical needs to a building is selected as a reference for solar resource use. Energy use improvement and consumption costs are calculated, and the equivalent amounts of greenhouse gases, not generated since solar technologies were implemented are determined. Furthermore, comparisons of the solar potential between Yuma and Mexicali show that the Mexican city has a higher annual solar potential, so the applicability of this solar technology is too feasible in Mexicali.

Néstor Santillán Soto; O. Rafael García Cueto; Sara Ojeda Benítez; Alejandro Adolfo Lambert Arista

2014-01-01T23:59:59.000Z

409

Innovative coke oven gas cleaning system for retrofit applications. Environmental Monitoring program. Volume 1 - sampling progrom report. Baseline Sampling Program report  

SciTech Connect

Bethlehem Steel Corporation (BSC), in conjunction with the Department of Energy (DOE) is conducting a Clean Coal Technology (CCT) project at its Sparrows Point, Maryland Coke Oven Plant. This innovative coke oven gas cleaning system combines several existing technologies into an integrated system for removing impurities from Coke Oven Gas (COG) to make it an acceptable fuel. DOE provided cost-sharing under a Cooperative Agreement with BSC. This Cooperative Agreement requires BSC to develop and conduct and Environmental Monitoring Plan for the Clean Coal Technology project and to report the status of the EMP on a quarterly basis. It also requires the preparation of a final report on the results of the Baseline Compliance and Supplemental Sampling Programs that are part of the EMP and which were conducted prior to the startup of the innovative coke oven gas cleaning system. This report is the Baseline Sampling Program report.

Stuart, L.M.

1994-05-27T23:59:59.000Z

410

Yaser Kishawi Degree Studied: MSc Environmental  

E-Print Network (OSTI)

such as Global Water Policy and Water and Environmental Management particularly. Also, I have found modules such as Research Methodology with Environmental Monitoring & Analysis as well as Environmental Management SystemsYaser Kishawi Degree Studied: MSc Environmental Engineering Year of Graduation: 2011 (Awarded MSc

Mottram, Nigel

411

Environment/Health/Safety (EHS): Environmental Services Group (ESG)  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Services Group Environmental Services Group Whom To Call Operating Permits For LBNL Activities Publications Advisories Internal Documents Environmental Management System Environmental Restoration Program Weather Data Image of Chicken Creek The Environmental Services Group, within the Environment, Health and Safety Division, provides a comprehensive range of cost-effective environmental management services to Berkeley Lab by working with research and support staff. Services include: Your visit may be enhanced by upgrading or installing the latest Flash Player. ESG sampling activity Air and Water Quality Management Hazardous Materials Management Environmental Monitoring Radiological Dose and Environmental Risk Assessment Environmental Management System Environmental Restoration News & Updates

412

Mobile Robot Sensing for Environmental Applications  

E-Print Network (OSTI)

infomechanical systems: A mobile wireless sensor networkMobile robot sensing for environmental applications Amarjeetsystems per- formed using mobile robot sensing systems. Both

2007-01-01T23:59:59.000Z

413

Climate & Environmental Sciences | Clean Energy | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Climate & Environment Climate Change Science Institute Earth and Aquatic Sciences Ecosystem Science Environmental Data Science and Systems Energy-Water Resource Systems Human...

414

Environmental Surveillance - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Monitoring The MSA project conducts environmental monitoring to measure radionuclide concentrations in various environmental media, including air, surface water,...

415

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNIVERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 DOE/EA-1791 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNVIERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 U.S. Department of Energy University of Minnesota Wind Energy Research Consortium Project Golden Field Office Environmental Assessment March 2011 Page i Table of Contents 1.0 Introduction .......................................................................................................................................... 1

416

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee June 2011 U.S. Department of Energy Oak Ridge Office This page intentionally left blank. DOE/EA-1779 Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee Date Issued-June 2011 Bechtel Jacobs Company, LLC and CDM Federal Services Inc. contributed to the preparation of this document and may not be considered for review of the document U.S. Department of Energy Office of Environmental Management This page intentionally left blank. iii CONTENTS FIGURES......................................................................................................................................................

417

ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Construction and Operation of a Proposed Biogas Anaerobic Digestion Facility at an Ethanol Plant Western Plains Energy, LLC Grinnell Township (Oakley), Gove County, Kansas U. S. Department of Agriculture Rural Business Cooperative Service 1400 Independence Avenue, SW Washington, DC 20250-3225 August 29, 2011 Environmental Assessment Western Plains Energy, LLC Gove County, Kansas ii TABLE OF CONTENTS Section Page I. PROPOSAL DESCRIPTION AND NEED .................................................................... 1 II. PRIMARY BENEFICIARIES AND RELATED ACTIVITIES .................................. 2 III. DESCRIPTION OF THE PROPOSAL AREA .............................................................. 2

418

Design, economic analysis and environmental considerations of mini-grid hybrid power system with reverse osmosis desalination plant for remote areas  

Science Journals Connector (OSTI)

This paper discusses the design process of a mini-grid hybrid power system with reverse osmosis desalination plant for remote areas, together with an economic analysis and environmental considerations for the project life cycle. It presents a design scenario for supplying electricity and fulfilling demand for clean water in remote areas by utilising renewable energy sources and a diesel generator with a reverse osmosis desalination plant as a deferrable load. The economic issues analysed are the initial capital cost needed, the fuel consumption and annual cost, the total net present cost (NPC), the cost of electricity (COE) generated by the system per kWh and the simple payback time (SPBT) for the project. The environmental considerations discussed are the amount of gas emissions, such as CO2 and NOx, as well as particulate matter released into the atmosphere. Simulations based on an actual set of conditions in a remote area in the Maldives were performed using HOMER for two conditions: before and after the Tsunami of 26th December 2004. Experimental results on the prototype 5 kVA mini-grid inverter and reverse osmosis desalination plant, rated at 5.5 kWh/day, are also presented here to verify the idea of providing power and water supplies to remote areas.

Ahmad Agus Setiawan; Yu Zhao; Chem. V. Nayar

2009-01-01T23:59:59.000Z

419

Environmental Sustainability  

NLE Websites -- All DOE Office Websites (Extended Search)

Environment » Environment » Environmental Stewardship » Environmental Sustainability /community-environment/_assets/images/icon_earthday.jpg Environmental Sustainability: Creating the Future Exercising our commitment to operating a sustainable site by creating a 50-year horizon of planning and preparing for effective environmental stewardship while executing national mission. Sustainability Goals» Recycling» Green Purchasing» Pollution Prevention» Reusing Water» Feature Stories» LOOK INTO LANL - highlights of our science, people, technologies close Novel cellulose structure requires fewer enzymes to process biomass to fuel Improved methods for breaking down cellulose nanofibers are central to cost-effective biofuel production. READ MORE An enzyme (shown in blue) pulls out individual cellulose chains (pink) from the pretreated nanofiber surface (green) and then breaks them apart into simple sugars. Image credit, Shishir Chundawat, Great Lakes Bioenergy Research Center.

420

Environmental Monitoring  

Science Journals Connector (OSTI)

Cell processing facilities should implement and maintain a program of environmental monitoring regardless of whether product manufacturing occurs in an unclassified laboratory space or in a Class 10,000 cleanroom

A. Gee MI Biol; PhD; D.L. Lyon MT (ASCP); CLSp (MB)

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Environmental decontamination  

SciTech Connect

The record of the proceedings of the workshop on environmental decontamination contains twenty-seven presentations. Emphasis is placed upon soil and surface decontamination, the decommissioning of nuclear facilities, and assessments of instrumentation and equipment used in decontamination. (DLS)

Cristy, G.A.; Jernigan, H.C. (eds.)

1981-02-01T23:59:59.000Z

422

Environmental assessment for the satellite power system-concept development and evaluation program-microwave health and ecological effects  

SciTech Connect

This report is concerned with the potential health and ecological effects of the microwave beam from the microwave power transmission system (MPTS) of the satellite power system (SPS). The report is written in the form of a detailed critical review of selected scientific articles from the published literature on the biological effects of nonionizing electromagnetic radiation, followed by an assessment of the possible effects of the SPS, based on exposure values for the reference system (US DOE and NASA, 1978).

Not Available

1980-11-01T23:59:59.000Z

423

RFEDSCHK User's Manual (The RFEDS Lab Data Check routine), Environmental and Scientific Systems Information Resources: Version 1. 00  

SciTech Connect

The RFEDS Laboratory Data Check routine (RFEDSCHK) preforms checks of the off-site laboratory data to identify missing and/or incorrect data which may exist. The check routine is designed to assist the laboratories to correct deficiencies contained in the data before it is sent to the Rocky Flats Environmental Management Department, there-by improving the quality of the data being placed in RFEDS. If the data passes the checks with no errors, the data will be acceptable for placement into RFEDS and delivery of the electronic data to EG G is appropriate. If errors are detected, the laboratory should correct the errors and perform the check again until the data is free of errors.

Not Available

1992-05-01T23:59:59.000Z

424

EA-1922: Draft Environmental Assessment | Department of Energy  

Office of Environmental Management (EM)

Environmental Assessment EA-1922: Draft Environmental Assessment Combined Power and Biomass Heating System, Fort Yukon, Alaska This DOE Draft EA, in cooperation with RUS and the...

425

EA-1922: Final Environmental Assessment | Department of Energy  

Office of Environmental Management (EM)

Environmental Assessment EA-1922: Final Environmental Assessment Combined Power and Biomass Heating System, Fort Yukon, Alaska DOE (lead agency), Denali Commission (cooperating...

426

The Added Economic and Environmental Value of Solar Thermal Systems in Microgrids with Combined Heat and Power  

E-Print Network (OSTI)

thermal absorption solar photo- storage chiller thermalbetween solar thermal collection and storage systems and CHPimpact of solar thermal and heat storage on CO 2 emissions

Marnay, Chris

2010-01-01T23:59:59.000Z

427

Climate & Environmental Sciences | Clean Energy | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Climate Change Science Institute Earth and Aquatic Sciences Ecosystem Science Environmental Data Science and Systems Energy, Water and Ecosystem Engineering Human Health Risk and Environmental Analysis Renewable Energy Systems Manufacturing Fossil Energy Sensors & Measurement Sustainable Electricity Systems Biology Transportation Clean Energy Home | Science & Discovery | Clean Energy | Research Areas | Climate & Environment SHARE Climate and Environmental Sciences Scientists Scott Brooks and Carrie Miller collect water quality data, East Fork Poplar Creek, November 15, 2012. Sampling site for mercury. Climate and environmental scientists at ORNL conduct research, develop technology and perform analyses to understand and predict how environmental systems respond to global and regional changes - including

428

Site Environmental Report for 1998  

SciTech Connect

Sandia National Laboratories (SNL) is committed to conducting its operations in an environmentally safe and sound manner. It is mandatory that activities at SNL/California comply with all applicable environmental statutes, regulations, and standards. Moreover, SNL/California continuously strives to reduce risks to employees, the public, and the environment to the lowest levels reasonably possible. To help verify effective protection of public safety and preservation of the environment, SNL/California maintains an extensive, ongoing environmental monitoring program. This program monitors all significant effluents and the environment at the SNL/California site perimeter. Lawrence Livermore National Laboratory (LLNL) performs off-site external radiation monitoring for both sites. These monitoring efforts ensure that emission controls are effective in preventing contamination of the environment. As part of SNL/California's Environmental Monitoring Program, an environmental surveillance system measures the possible presence of hazardous materials in groundwater, stormwater, and sewage. The program also includes an extensive environmental dosimetry program, which measures external radiation levels around the Livermore site and nearby vicinity. Each year, the results of the Environmental Monitoring Program are published in this report, the Site Environmental Report. This executive summary focuses on impacts to the environment. Chapter 3, ''Compliance Summary,'' reviews the site's various environmental protection activities and compliance status with applicable environmental regulations. The effluent monitoring and environmental surveillance results for 1998 show that SNL/California operations had no harmful effects on the environment or the public.

Holland, R.C.

1999-06-01T23:59:59.000Z

429

Nevada Test Site Environmental Report 2005  

SciTech Connect

The Nevada Test Site Environmental Report 2005 (NTSER) was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the NTS Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts.

Cathy A. Wills

2006-10-01T23:59:59.000Z

430

BNL | Environmental Sciences Department | Brookhaven National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Sciences Department Environmental Sciences Department Home Atmospheric System Group Overview Research Areas Aerosol Life Cycle Cloud Life Cycle Cloud-Aerosol-Precipitation Interactions ARM Group Overview Facilities MAOS External Data Center Cloud Life Cycle Infrastructure Field Campaigns MAGIC Biomass Burns (BBOP) TCAP Aerosol Life Cycle IOP RACORO MC3E FASTER Tracer Tech Environmental Tech Carbon Cycle Group Overview Research Areas Climate Change Experimental Facility Design and Management Plant Physiology and High Throughput Biochemical Phenotyping Soil Carbon Monitoring Publications Staff EBC Environmental, Biological, and Computational Sciences Directorate Environmental Sciences Image Sampling equipment BATS II ARM SGP Facility meteorology data MAGIC program Environmental Sciences Environmental research at Brookhaven focuses on atmospheric physics and

431

Environmental Applications of Geographic Information Systems Dr. Tom Frank www.sdal.uiuc.edu tdfrank@illinois.edu  

E-Print Network (OSTI)

An Introduction to GIS methods #12;#12;#12;#12;#12;Geographic Information Systems work with maps. Since most maps in a GIS #12;The most commonly used coordinate system for these maps is latitude and longitude Longitude geoprocessing functions to create new geographic entities clip, union, intersect, dissolve ! Creates maps

Frank, Thomas D.

432

This paper has been downloaded from the Building and Environmental Thermal Systems Research Group at Oklahoma State University  

E-Print Network (OSTI)

used in outdoor evaporator coils of air-source heat pump systems. Despite their potential for heat-effective performance of air condition- ing, refrigeration, and heat pump systems. The benefits of microchannel heat measured during actual frosting operating conditions, and relations with heat transfer rates, air

433

Improving the Technical, Environmental, and Social Performance of Wind Energy Systems Using Biomass-Based Energy Storage  

SciTech Connect

A completely renewable baseload electricity generation system is proposed by combining wind energy, compressed air energy storage, and biomass gasification. This system can eliminate problems associated with wind intermittency and provide a source of electrical energy functionally equivalent to a large fossil or nuclear power plant. Compressed air energy storage (CAES) can be economically deployed in the Midwestern US, an area with significant low-cost wind resources. CAES systems require a combustible fuel, typically natural gas, which results in fuel price risk and greenhouse gas emissions. Replacing natural gas with synfuel derived from biomass gasification eliminates the use of fossil fuels, virtually eliminating net CO{sub 2} emissions from the system. In addition, by deriving energy completely from farm sources, this type of system may reduce some opposition to long distance transmission lines in rural areas, which may be an obstacle to large-scale wind deployment.

Denholm, P.

2006-01-01T23:59:59.000Z

434

An environmental analysis of injection molding  

E-Print Network (OSTI)

This thesis investigates injection molding from an environmental standpoint, yielding a system-level environmental analysis of the process. There are three main objectives: analyze the energy consumption trends in injection ...

Thiriez, Alexandre

2006-01-01T23:59:59.000Z

435

Environmental control for confinement livestock housing  

SciTech Connect

Advantages and disadvantages of mechanical ventilation systems for livestock housing are discussed. Various principles involved in environmental control are reviewed. The design, operation, maintenance, and management of the equipment needed for environmental control are discussed. (JGB)

Jones, D.D.; Friday, W.H.; DeForest, S.S.

1980-06-01T23:59:59.000Z

436

Climate & Environmental Sciences | More Science | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Climate & Environment Climate & Environment SHARE Climate and Environmental Sciences Climate and environmental scientists at ORNL conduct research, develop technology and perform analyses to understand and predict how environmental systems respond to global and regional changes - including climate change, environmental stress and energy production and use. By integrating field and laboratory methods with new theory, modeling, data systems and policy analysis, we develop solutions to complex environmental challenges. ORNL has an increasing programmatic focus on climate change and subsurface biogeochemical research. Current priorities in the area of climate and environmental research are focused on understanding biogeochemical cycling in terrestrial ecosystems by creating new databases and models to inform

437

Climate & Environmental Sciences | More Science | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Climate & Environment Climate & Environment SHARE Climate and Environmental Sciences Climate and environmental scientists at ORNL conduct research, develop technology and perform analyses to understand and predict how environmental systems respond to global and regional changes - including climate change, environmental stress and energy production and use. By integrating field and laboratory methods with new theory, modeling, data systems and policy analysis, we develop solutions to complex environmental challenges. ORNL has an increasing programmatic focus on climate change and subsurface biogeochemical research. Current priorities in the area of climate and environmental research are focused on understanding biogeochemical cycling in terrestrial ecosystems by creating new databases and models to inform

438

United States Environmental Protection  

E-Print Network (OSTI)

quality in public water systems; remediation of contaminated sites, sediments and ground water; preventionUnited States Environmental Protection Agency Hydrogeologic Framework, Ground-Water Geochemistry/R-02/008 January 2002 Hydrogeologic Framework, Ground-Water Geochemistry, and Assessment of Nitrogen

439

1984 environmental monitoring report  

SciTech Connect

The environmental monitoring program has been designed to ensure that BNL facilities operate such that the applicable environmental standards and effluent control requirements have been met. A listing, as required by DOE Order 5484.1 of BNL facilities, of environmental agencies and permits is provided in the Environmental Program Information Section 3.0, Table B. Since the aquifer underlying Long Island has been designated a ''sole source'' aquifer, the Environmental Protection Agency (EPA) Drinking Water Standards have been used in the assessment of ground water data. However, the limits prescribed in the regulations are not directly applicable to the monitoring well data since (1) the standards apply to a community water supply system, i.e., one serving more than 25 individuals, and (2) the standards represent an annual average concentration. Since the monitoring wells are not components of the Laboratory's water supply system, the EPA drinking water standards are employed as reference criteria to which the surveillance well data is compared. The standards also serve as guidance levels for any appropriate remedial action. 36 refs., 9 figs., 40 tabs.

Day, L.E.; Miltenberger, R.P.; Naidu, J.R. (eds.)

1985-04-01T23:59:59.000Z

440

This paper has been downloaded from the Building and Environmental Thermal Systems Research Group at Oklahoma State University  

E-Print Network (OSTI)

at Oklahoma State University (http://www.hvac.okstate.edu) The correct citation for this paper is: Cremaschi conductivity of cylindrical shaped pipe insulation systems exists in the ASTM standards but it is based

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Exergy Analysis and Environmental Impact Assessment of Using Various Refrigerants for Hybrid Electric Vehicle Thermal Management Systems  

Science Journals Connector (OSTI)

Thermal issues associated with EV and HEV battery packs and underhood electronics can significantly affect the performance and life cycle of the battery and the associated system. In order to keep the battery ope...

Halil S. Hamut; Ibrahim Dincer…

2013-01-01T23:59:59.000Z

442

Environmental Studies An Overview  

E-Print Network (OSTI)

and Water Conservation Environmental Education Environmental Communications Water Quality Management Air water supplies, and reclaim contaminated land and water to comply with federal environmental regulationsEnvironmental Studies An Overview Environmental scientists conduct research to identify and abate

Colorado at Boulder, University of

443

Direct from CDC Environmental Health  

E-Print Network (OSTI)

environmental health services (i.e., services involving water quality, air quality, waste management, or vector management plans of water supply systems. The team also works on sustainability evalu ation and sanitationDirect from CDC Environmental Health Services Branch Editor's note: NEHA strives to provide up

444

Use of caged fish for mariculture and environmental monitoring in a power-plant cooling-water system  

E-Print Network (OSTI)

-nydrocarbon pesticides in fishes cultured at various locations within the cooling system. 203 LIST OF FIGURES Figure Page Map of the research site ~g the location of the power plant, cooling-water system, and research facilities 17 Schematic representation... quality might conceivably be available considering the large number of power plants utilizing coastal waters for cooling. Other important benefits of thermal fish-culture include ample water supply, and reduced pumping costs as a result of the massive...

Chamberlain, George William

2012-06-07T23:59:59.000Z

445

Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

the Interior the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NV-S010-2013-0052-EA DOE/EA-1960 June 28, 2013 Townsite Solar Project Transmission Line PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Southern Nevada District Office Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, Nevada 702-515-5000 Office 702-515-5010 Fax Environmental Assessment for the Townsite Solar Project DOE/EA-1960 DOI-BLM-NV-S010-2013-0052 EA N-91290 Prepared For U.S. Department of the Interior

446

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 ENVIRONMENTAL ASSESSMENT FOR PROPOSED ENERGY CONSERVATION STANDARDS FOR RESIDENTIAL CLOTHES WASHERS December 2000 U.S. Department of Energy Assistant Secretary, Energy Efficiency & Renewable Energy Office of Building Research and Standards Washington, DC 20585 ENVIRONMENTAL ASSESSMENT FOR RESIDENTIAL CLOTHES WASHERS TABLE OF CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 2. PURPOSE AND NEED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 3. ALTERNATIVES INCLUDING THE PROPOSED ACTION . . . . . . . . . . . . . . . . . EA-2 3.1 No Action Alternative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.2 Proposed Standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.3 Alternative Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-3 3.4 Impacts of Proposed and Alternative Standards

447

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Interior the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NV-S010-2013-0052-EA DOE/EA-1960 June 28, 2013 Townsite Solar Project Transmission Line PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Southern Nevada District Office Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, Nevada 702-515-5000 Office 702-515-5010 Fax Environmental Assessment for the Townsite Solar Project DOE/EA-1960 DOI-BLM-NV-S010-2013-0052 EA N-91290 Prepared For U.S. Department of the Interior

448

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

682 682 Environmental Assessment Upgrades and Life Extension of the 242-A Evaporator, Hanford Site, Richland, Washington Conducted Under the American Recovery and Reinvestment Act of 2009 U.S. Department of Energy Richland, Washington Environmental Assessment February 20 10 DOE/EA- 1682 This page intentionally left blank. 1 February 20 10 DOE/EA- 1682 TABLE OF CONTENTS 1.0 INTRODUCTION..............................................................................1. 1.1 BACKGROUND ......................................................................... 3 1.2 PURPOSE AND NEED FOR THE PROPOSED ACTION ......................... 6 1.3 NEPA REQUIREMENTS............................................................... 6 2.0 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVE ....................... 8

449

DOE/NV/26383-LTR2008-01 Letter Report Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Caliente, Lincoln County, Nevada  

SciTech Connect

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Beatty, Sarcobatus Flats, Rachel, Caliente, Pahranagat NWR, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

J. Engelbrecht; I. Kavouras; D. Campbell; S. Campbell; S. Kohl; D. Shafer

2009-04-02T23:59:59.000Z

450

Power Systems Engineering  

NLE Websites -- All DOE Office Websites (Extended Search)

and distribution systems; steam, water, fuel, and environmental monitoring systems; alternative energy systems; reliability, availability, and maintainability assessments;...

451

Environmental Management  

SciTech Connect

Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

None

2014-11-12T23:59:59.000Z

452

Environmental Management  

ScienceCinema (OSTI)

Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

None

2015-01-07T23:59:59.000Z

453

Environmental loads from water-sprinkled softwood timber. 1: Characteristics of an open and a recycling watering system  

SciTech Connect

The concentrations of a number of organic and inorganic compounds in the wastewater from sprinkling of landstored softwood timber was monitored during a period of up to 18 weeks. A recycling system using a watering intensity of 160 mm/24 h, and an open system with intensities between 55 to 12 mm/24 h were studied. The compound classes investigated included dissolved organic carbon; distillable phenols; resin acids; bacterial phospholipid fatty acids (PLFA); organic and inorganic phosphorus, sulfur, and nitrogen; and a number of metal ions. In the recycling system, the peak concentrations occurred after 4 to 6 weeks, and the amounts accumulated through refilling of water largely exceeded those present in the wastewater at the end of the storage. In the open system, net loads of compounds occurred during the first weeks, which thereafter turned into uptakes for most compounds. The PLFA increased during the first weeks and clearly responded to the peak concentrations in the waters. Already from the start there were strong uptakes of nitrate, sulfate, and many minerals in the piles, suggesting that the supply of macro- and micronutrients necessary for microbial growth, as well as available terminal electron acceptors, may be a limiting factor for the extent of microbial degradation performed in the pile.

Borga, P.; Elowson, T.; Liukko, K. [Swedish Univ. of Agricultural Sciences, Uppsala (Sweden)

1996-06-01T23:59:59.000Z

454

ASME-ATI-UIT 2010 Conference on Thermal and Environmental Issues in Energy Systems 16 19 May, 2010, Sorrento, Italy  

E-Print Network (OSTI)

, 2010, Sorrento, Italy INTRODUCTION Air source heat pump systems are used for heating and cooling heat pump exchanges heat directly from the indoor environment to the outdoor ambient air, and during buildings all year around. They are energy efficient, compact and have low installation cost. An air source

455

[Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio]. Volume 9, Removal action system design  

SciTech Connect

This Removal Action System Design has been prepared as a Phase I Volume for the implementation of the Phase II removal action at Wright-Patterson Air Force Base (WPAFB) near Dayton, Ohio. The objective of the removal action is to prevent, to the extent practicable, the migration of ground water contaminated with chlorinated volatile organic compounds (VOCS) across the southwest boundary of Area C. The Phase 1, Volume 9 Removal Action System Design compiles the design documents prepared for the Phase II Removal Action. These documents, which are presented in Appendices to Volume 9, include: Process Design, which presents the 30 percent design for the ground water treatment system (GWTS); Design Packages 1 and 2 for Earthwork and Road Construction, and the Discharge Pipeline, respectively; no drawings are included in the appendix; Design Package 3 for installation of the Ground Water Extraction Well(s); Design Package 4 for installation of the Monitoring Well Instrumentation; and Design Package 5 for installation of the Ground Water Treatment System; this Design Package is incorporated by reference because of its size.

Not Available

1992-04-01T23:59:59.000Z

456

Field deployments of the MESSAGE system for environmental Draft submission to TEC December Issue (MESSAGE Paper 2)  

E-Print Network (OSTI)

monitoring and management of air pollution from road traffic. It is a large project involving five the relationships between transport and air pollution. Three different sensor systems have been developed to allow and air pollution. Where appropriate, field trials were supported by additional deployment of conventional

Newcastle upon Tyne, University of

457

Handling and Segregating System for 55-Gallon Drums Project-Current Progress on Testing and Integration at the Western Environmental Technology Office  

SciTech Connect

The Savannah River Site (SRS) along with other U.S. Department of Energy (DOE) sites have thousands of drums of mixed transuranic (TRU) waste that are being stored awaiting transfer to the Waste Isolation Pilot Plant (WIPP). The SRS drums contain noncompliant items that must meet WIPP waste acceptance criteria (WAC) before being accepted. A system is being developed by the DOE Transuranic and Mixed Waste Focus Area (TMFA) under the Robotics Crosscut Program to repackage drummed, mixed TRU waste to meet WIPP WAC. This system, the Handling and Segregating System for 55-gallon drums (HANDSS-55), will economically and remotely open, sort, and segregate noncompliant components of the waste inside the drums and repackage the compliant components in a new drum suitable for shipment and acceptance by WIPP in New Mexico. HANDSS-55 is scheduled to be deployed for operation at the SRS Solid Waste Division by September 30, 2004. Other versions of HANDSS-55 may later be deployed at other DOE sites. MSE Technology Applications, Inc. (MSE) was selected to integrate and demonstrate the HANDSS-55 modules being developed by the Idaho National Engineering and Environmental Laboratory (INEEL) and the Savannah River Technology Center (SRTC). This paper reports progress on integration and testing to date.

Battleson, D. M.; Johnson, S. E.; Montgomery, J. L.; Bryson, S. B.; Stacey, M. C.; Frazee, C. M.

2002-02-25T23:59:59.000Z

458

Indicator-based economic, environmental, and social sustainability assessment of a small gasification bioenergy system fuelled with food processing residues from the Mediterranean agro-industrial sector  

Science Journals Connector (OSTI)

Abstract Small-scale gasification systems coupled with internal combustion engines could be innovative alternatives for combined heat and power production when fuelled with agricultural residues, providing benefits related to both food processing waste management and sustainable agriculture. In the present study, an indicator-based estimation of sustainability was performed for a gasification-based bioenergy system considering not only economic but also environmental and social issues. The analysed scenario consisted of an installed capacity of 40 kWel, with an investment cost estimated to be approximately 1520 €/kWhel and a net profit up to 20,000 €/year. However, commercial success depends on instruments of reducing capital investment, such as subsidies, electricity feed-in tariffs, and biomass prices. Additional benefits such as low- or zero-cost feedstock and zero-cost biomass logistics suggest that small-scale gasification systems based on agricultural residues are likely to play an important role in future energy supplies for Mediterranean countries.

P. Manara; A. Zabaniotou

2014-01-01T23:59:59.000Z

459

United States Environmental Monitoring  

Office of Legacy Management (LM)

EPA 60014-91/030 EPA 60014-91/030 Environmental Protection Systems Laboratory DOE/DP00539-063 Agency P.O. Box 93478 Las Vegas NV 891 93-3478 Research and Development Offsite Environmental Monitoring Report: 1 - 3 5 Radiation Monitorina Around * / (- P 7 1 United States ~ u c l g a r Test Areas Calendar Year 1990 This page intentionally left blank EPN60014-90 DOWDP Offsite Environmental Monitoring Report: Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1990 Contributors: D.J. Chaloud, B.B. Dicey, D.G. Easterly, C.A. Fontana, R.W. Holloway, A.A. Mullen, V.E. Niemann, W.G. Phillips, D.D. Smith, N.R. Sunderland, D.J. Thome, and Nuclear Radiation Assessment Division Prepared for: U.S. Department of Energy under Interagency Agreement Number DE-A108-86-NV10522

460

NETL: Geological and Environmental Science  

NLE Websites -- All DOE Office Websites (Extended Search)

Geological & Environmental Systems Geological & Environmental Systems Onsite Research Geological and Environmental Sciences Geological and Environmental Sciences (GES) is a focus area of the National Energy Technology Laboratory's Office of Research and Development (ORD). ORD's other focus areas are Energy System Dynamics, Computational and Basic Sciences, and Materials Science and Engineering. Scientists and engineers in ORD conduct research at NETL's advanced research facilities in Morgantown, WV; Pittsburgh, PA; and Albany, OR, and at various offsite locations. GES tackles the challenge of clean energy production from fossil energy sources by focusing on the behavior of natural systems at both the earth's surface and subsurface, including prediction, control, and monitoring of fluid flow in porous and fractured media. Efforts include

Note: This page contains sample records for the topic "abb environmental systems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

United States Environmental Monitoring EPA  

Office of Legacy Management (LM)

United United States Environmental Monitoring EPA 600/R-93/141 Environmental Protection Systems Laboratory January 1992 Agency P.O. Box 93478 Las Vegas NV 89193-3478 Research and Development _EPA Offsite Environmental Monitoring Report: Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1991 Available to DOE and DOE contractors from the Office of Scientificand Technical Information, P.O. Box 62, Oak ridge,TN 39831; pricesavailablefrom (615) 576-8401 Availableto the publicfrom the NationalTechnicalInformationService, U.S. Departmentof Commerce, 5285 Port Royal Road, Springfield, VA 22161 Price Code: PrintedCopyof MicroficheA01 Frontand back cover: CommunityMonitorStation (front) and Whole BodyLaboratory(back), Craig A. Tsosle EnvironmentalMonitoringSystemsLaboratory-LasVegas, Nevada Offsite Environmental Monitoring Report:

462

SRS Environmental Report 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Environmental Report Summary Environmental Report - 2012 Environmental Data / Maps - 2012 EMS Description Manual Environmental Dose Assessment Manual Environmental Policy SRAP SREL SRNS Annual Report Savannah River Remediation USFS-SR References SRS spacer Bottomland Hardwood Forest bottomland hardwood/floodplain forest Front Cover - David Scott of the Savannah River Ecology Laboratory (SREL) provided this year's cover photo. The photo was taken in the Mixed Swamp Forest Set-Aside, which is part of the Savannah River swamp. This Set-Aside is one of the original ten SREL habitat reserve areas selected in 1968 to represent a diversity of bottomland hardwood/floodplain forest communities of a southern river swamp system. Represented are aquatic, semi-aquatic, and terrestrial habitats associated with cypress-tupelo ponds, mixed hardwood sloughs, and mixed hardwood ridges. This Set-Aside is important because seasonally flooded hardwood forests are becoming increasingly rare habitats that are particularly vulnerable to habitat destruction and/or alteration due to drainage, water control projects, industrial or urban waste discharge, or power plant cooling effluents. The flower in the foreground is called Lizard's Tail (Latin name Saururus cernuus). It grows in a variety of aquatic habitats, but on SRS it can be particularly abundant in some of the swamp forests

463

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Purpose, Need and Issues Purpose, Need and Issues S-1 Summary In this summary: ΠPurpose, Need, and Issues ΠMethods and Their Impacts ΠPlanning Steps ΠProgram Alternatives and Their Impacts Purpose, Need and Issues Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 15,000 miles of electric transmission lines and 350 substations. This electric transmission system operates in seven states of the Pacific Northwest. (See Figure S-1.) Those states offer a great diversity of vegetation (from trees to brush to grasses), which can interfere with electric power flow, pose safety problems for us and neighboring members of the public, or interfere with our ability to maintain our system. We need to keep vegetation a safe distance away from our electric power facilities and control

464

Investigation of thermochemical biorefinery sizing and environmental sustainability impacts for conventional supply system and distributed pre-processing supply system designs  

SciTech Connect

The 2011 US Billion-Ton Update estimates that by 2030 there will be enough agricultural and forest resources to sustainably provide at least one billion dry tons of biomass annually, enough to displace approximately 30% of the country's current petroleum consumption. A portion of these resources are inaccessible at current cost targets with conventional feedstock supply systems because of their remoteness or low yields. Reliable analyses and projections of US biofuels production depend on assumptions about the supply system and biorefinery capacity, which, in turn, depend upon economic value, feedstock logistics, and sustainability. A cross-functional team has examined combinations of advances in feedstock supply systems and biorefinery capacities with rigorous design information, improved crop yield and agronomic practices, and improved estimates of sustainable biomass availability. A previous report on biochemical refinery capacity noted that under advanced feedstock logistic supply systems that include depots and pre-processing operations there are cost advantages that support larger biorefineries up to 10 000 DMT/day facilities compared to the smaller 2000 DMT/day facilities. This report focuses on analyzing conventional versus advanced depot biomass supply systems for a thermochemical conversion and refinery sizing based on woody biomass. The results of this analysis demonstrate that the economies of scale enabled by advanced logistics offsets much of the added logistics costs from additional depot processing and transportation, resulting in a small overall increase to the minimum ethanol selling price compared to the conventional logistic supply system. While the overall costs do increase slightly for the advanced logistic supply systems, the ability to mitigate moisture and ash in the system will improve the storage and conversion processes. In addition, being able to draw on feedstocks from further distances will decrease the risk of biomass supply to the conversion facility.

David J. Muth, Jr.; Matthew H. Langholtz; Eric C. D. Tan; Jacob J. Jacobson; Amy Schwab; May M. Wu; Andrew Argo; Craig C. Brandt; Kara G. Cafferty; Yi-Wen Chiu; Abhijit Dutta; Laurence M. Eaton; Erin M. Searcy

2014-08-01T23:59:59.000Z

465

RMOTC - Library - Environmental Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Documents The U.S. Department of Energy National Environmental Policy Act (NEPA) requires careful consideration of the potential environmental consequences of all...

466

HUD's Environmental Review Training  

Energy.gov (U.S. Department of Energy (DOE))

An environmental review is the process of reviewing a project and its potential environmental impacts to determine whether it meets  federal, state, and local environmental standards. The...

467

Review: Wicked Environmental Problems  

E-Print Network (OSTI)

Bauer, ed. Forging Environmentalism (2006). Regardless ofby reading Wicked Environmental Problems as they participateReview: Wicked Environmental Problems: Managing Uncertainty

Jenkins, David

2012-01-01T23:59:59.000Z

468

2010 Site Environmental Report  

SciTech Connect

Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory's environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. Volume II of the SER, the Groundwater Status Report, also is prepared annually to report on the status of and evaluate the performance of groundwater treatment systems at the Laboratory. Volume II includes detailed technical summaries of groundwater data and its interpretation, and is intended for internal BNL users, regulators, and other technically oriented stakeholders. A brief summary of the information contained in Volume II is included in Chapter 7, Groundwater Protection, of this volume. Both reports are available in print and as downloadable files on the BNL web page at http://www.bnl.gov/ewms/ser/. An electronic version on compact disc is distributed with each printed report. In addition, a summary of Volume I is prepared each year to provide a general overview of the report, and is distributed with a compact disc containing the full report. BNL is operated and managed for DOE's Office of Science by Brookhaven Science Associates (BSA), a partnership formed by Stony Brook University and Battelle Memorial Institute. For more than 60 years, the Laboratory has played a lead role in the DOE Science and Technology mission and continues to contribute to the DOE missions in energy resources, environmental quality, and national security. BNL manages its world-class scientific research with particular sensitivity to environmental issues and community concerns. The Laboratory's motto, 'Exploring Life's Mysteries...Protecting its Future,' and its Environmental, Safety, Security and Health Policy reflect the commitment of BNL's management to fully integrate environmental stewardship into all facets of its mission and operations.

Ratel, K.; Lee, R; Remien, J; Hooda, B; Green, T; Williams, J; Pohlot, P; Dorsch, W; Paquette, D; Burke, J

2011-10-01T23:59:59.000Z

469

Building Environmental Health Capacity in Allegheny County  

E-Print Network (OSTI)

Building Environmental Health Capacity in Allegheny County: Environmental Indicators Outcomes standard Air Quality Computer Systems Days exceeding ozone standard Air Quality Computer Systems Attainment of the annual PM-2.5 standard (Fine particulates) Air Quality Computer Systems Annual PM-2.5 level Air Quality

470

Council on Environmental Quality - Guidance for Environmental...  

Open Energy Info (EERE)

Guidance for Environmental Assessments of Forest Health Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Memorandum: Council on Environmental Quality -...

471

Mobile Robot Sensing for Environmental Applications  

E-Print Network (OSTI)

deployable cable based robot,” in IEEE ICRA, Rome, Italy,Mobile robot sensing for environmental applications Amarjeetsystems per- formed using mobile robot sensing systems. Both

2007-01-01T23:59:59.000Z

472

Environmental Standardization for Sustainability  

E-Print Network (OSTI)

Environmental Standardization for Sustainability by Professor John W. Bagby College of Information that environmental controls are expressed as environmental standards, a traditional driver of investment in pollution control. Environmental standards spur investment in green technologies that promise to stimulate

Bagby, John

473

River Protection Project (RPP) Environmental Program Plan  

SciTech Connect

This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

POWELL, P.A.

2000-03-29T23:59:59.000Z

474

Faculty of Science: ENVIRONMENTAL PROGRAMMES  

E-Print Network (OSTI)

Industrial Water and Wastewater Inspector Environmental Technologist Restorative Biologist Environmental Economist GIS Analyst Environmental Project Manager Environmental Training Specialist www.environmentalFaculty of Science: ENVIRONMENTAL PROGRAMMES Possible Careers Environmental Planner Hazardous

Brownstone, Rob

475

M E Environmental Management Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

safety  performance  cleanup  closure safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management Office of Site Restoration, EM-10 Office of D&D and Facility Engineering, EM-13 Facility Deactivation & Decommissioning (D&D) D&D Program Map Addendum: Impact of American Recovery and Reinvestment Act (ARRA) on EM's D&D Program 2013 Edition U.S. Department Of Energy safety  performance  cleanup  closure M E Environmental Management Environmental Management safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management 3/13/2013 The American Recovery and Reinvestment Act of 2009

476

The utility of a geographic information system in facility/land use-related opportunities and constraints analysis for the Rocky Flats Environmental Technology Site  

SciTech Connect

Facility/land use-related opportunities and constraints analysis, which is indispensable for the evaluation of potential future uses for a site, is essentially spatial in nature. Spatial analysis is best accomplished using a geographic information system (GIS), as a GIS allows the identification and reporting or mapping of complex relationships among multiple data layers such as geology, soils, vegetation, contamination, and facilities. GIS-based maps and reports are valuable tools for communicating facility/land use-related opportunities and constraints to decision makers. This paper defines the term {open_quotes}GIS,{close_quotes}, provides an example of how a GIS could be used to conduct opportunities and constraints analysis at the Rocky Flats Environmental Technology Site (RFETS), and summarizes the benefits of using a GIS for this analysis. Because a GIS is often seen as a {open_quotes}black box{close_quotes} shrouded in technical jargon, this paper attempts to describe the concepts and benefits of a GIS in language understandable to decision makers who are not GIS experts but who migth profit from the use of GIS products. The purpose of this paper is to alert DOE decision makers to a valuable source of facility/land use-related information that already exists at many sites and that should not be overlook during the analysis of future use options.

Stewart, J. [S.M. Stoller Corp., Boulder, CO (United States)

1994-12-31T23:59:59.000Z

477

Environmental Spectroscopy and Biogeochemistry Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

ES&B Overview ES&B Overview Section 2-2-1 Environmental Spectroscopy and Biogeochemistry Facility The Environmental Spectroscopy and Biogeochemistry (ES&B) Facility focuses on environ- mental molecular science and application of the fundamental concepts of physical chemistry to the study of chemical reactions in heterogeneous natural materials, with an emphasis on soil and subsurface systems. The ES&B Facility staff, along with other Pacific Northwest National Laboratory (PNNL) staff, form a multidisciplinary research team with expertise in chemistry, mineral physics, geochemistry, soil chemistry, microbiology, hydrology, and environmental engineering. Capabilities Capabilities are available for materials characterization, aqueous- and solid-phase speciation

478

Environmental Protection Division (EPD), Brookhaven National Laboratory,  

NLE Websites -- All DOE Office Websites (Extended Search)

EMS Home EMS Home ESSH Policy Environmental Protection Division Other Information BNL Site Index Can't View PDFs? Brookhaven National Laboratory ISO 14001 Environmental Management System OHSAS 18001 Occupational Health & Safety Assessment Series One of Brookhaven National Laboratory's highest priorities is ensuring that the Laboratory's environmental, safety and health (ESH) performance measures up to its world class status in science. Brookhaven Science Associates (BSA), the contractor operating the Laboratory on behalf of the U.S. Department of Energy, takes ESH performance very seriously. As part of their commitment to responsible ESH operations, they have established an Environmental Management System (EMS) and Occupational Safety and Health (OSH) Management System.

479

Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

ASSESSMENT (EA) ASSESSMENT (EA) FOR THE RECONSTRUCTION OF THE SOUTH ACCESS ROAD (CR 802) IN SUPPORT OF THE DEPARTMENT OF ENERGY, WASTE ISOLATION PILOT PLANT (WIPP) IN EDDY COUNTY, NEW MEXICO NEPA #: DOI-BLM-NM-P020-2010-0011-EA PREPARED IN COOPERATION WITH: DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE P. O. BOX 2078 CARLSBAD, NM 88221-2078 PREPARED BY: OWEN W. LOFTON SUPERVISORY MULTI RESOURCES SPECIALIST BUREAU OF LAND MANAGEMENT CARLSBAD FIELD OFFICE 620 EAST GREENE CARLSBAD, NM 88220 ENVIRONMENTAL ASSESSMENT BLM Office: Carlsbad Field Office DOI-BLM-NM-P020-2010-0011-EA Serial #: NM-123703 Department of Energy (DOE), Carlsbad Field Office (CBFO) Waste Isolation Pilot Plant (WIPP) South Access Road (SAR) 1.0 Purpose and Need for Action 1.1 The DOE CBFO, is requesting a right-of-way (ROW) that consists of re-

480

Waste Isolation Pilot Plant Annual Site Environmental Report for 2012  

SciTech Connect

The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site