Powered by Deep Web Technologies
Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Ventyx, an ABB Company  

Gasoline and Diesel Fuel Update (EIA)

Ventyx, an ABB Company Ventyx, an ABB Company 1495 Canyon Blvd Suite 100 Boulder, CO 80302 (t) 720.240.5500 www.ventyx.com April 30, 2013 Ms. Rebecca Peterson U.S Department of Energy, U.S. Energy Information Administration, Mail Stop EI-23, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 20585 Re: Proposed changes to Energy Information Administration Forms EIA-63B, EIA-411, EIA-826, EIA-860, EIA-860M, EIA-861, EIA-861S, and EIA-923. Federal Register Vol. 78 No. 44, Wednesday March 6, 2013. Dear Ms. Peterson: We appreciate the time and effort the Energy Information Administration spends collecting, maintaining and distributing industry wide data. The data found in EIA forms 923, 860, 860M, 861 and 826 is the industry standard and used by market analysts and

2

The ABB LEBS system design  

SciTech Connect

The objectives of the U.S. Department of Energy (DOE) {open_quotes}Engineering Development of Advanced Coal-Fired Low-Emission Boiler Systems{close_quotes} (LEBS) project are to dramatically improve environmental performance of future pulverized coal-fired power plants, to increase their efficiency and to reduce their cost of electricity using near-term technologies, i.e., advanced technologies that are partially developed. The overall objective is to expedite commercialization of the technologies that are developed. The paper describes the work by the ABB team on the LEBS project which is part of the DOE`s Combustion 2000 Program. A major deliverable of the Project is the design of a 400 MWe commercial generating unit (CGU). The design being developed by the ABB team is projected to meet all the project objectives and to reduce emissions of NO{sub x}, SO{sub 2} and particulates to one-third to one-sixth NSPS limits while increasing net station efficiency significantly and reducing the cost of electricity. Development activities supporting the design work are described in the paper.

Regan, J.W.; Davidson, M.J.; Wesnor, J.D. [and others

1996-12-31T23:59:59.000Z

3

ABB`s LEBS activities -- A status report  

SciTech Connect

ABB Combustion Engineering, Inc. is one of three contractors executing Phases 1, 2 and 3 of the Department of Energy project entitled Engineering Development of Advanced Coal-Fired Low-Emission Boiler Systems (LEBS). Phase 1 has been completed and Phase 2 is scheduled for completion on September 30, 1996. The following major activities are being carried out in parallel in Phase 2 and this paper is a status report on this work: (1) in-furnace NOx reduction; (2) catalytic filter optimization; (3) add Kalina cycle to POCTF; and (4) POCTF design and licensing. The in-furnace NOx reduction work has been completed and, therefore, a description of this work comprises the major part of this paper.

Regan, J.W.; Hein, R.J. von [ABB Power Plant Labs. (United States); Peletz, L.J. Jr. [ABB CE Utility Power Boilers (United States); Wesnor, J.D. [ABB Environmental Systems (United States); Bender, D.J. [Raytheon Engineers and Constructors (United States)

1996-12-31T23:59:59.000Z

4

2000 TMS Annual Meeting Exhibitor: ABB INDUSTRIE AG  

Science Conference Proceedings (OSTI)

... solution that strengthens our clients' entire operation. ABB leads the market in key electrical generation, distribution and transformer rectifier systems.

5

STATEMENT OF CONSIDERATIONS REQUEST BY ABB AIR PREHEATER, INC...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

compliant, fossil fired utility boiler. Specifically, ABB will supply a Q-Pipe heat pipe air preheater with high thermal effectiveness and a non-leak design. As...

6

REQUEST BY ABB POWER GENERATION, INC., FOR AN ADVANCE WAIVER...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement of Considerations REQUEST BY ABB POWER GENERATION, INC., FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN RIGHTS IN SUBJECT INVENTIONS MADE IN THE COURSE OF OR UNDER...

7

Evaluation and Testing of ABB Circuit Breakers with Mobilgrease 28  

Science Conference Proceedings (OSTI)

The information in this document is intended to assist plants in evaluating the use of Mobilgrease 28 in ABB K-Line and HK circuit breakers and determining the maintenance intervals of these circuit breakers. The information in this document is applicable to both ABB K-Line and HK (air-blast) circuit breakers.

2001-10-30T23:59:59.000Z

8

Cleveland Abbe and American Meteorology, 1871–1901  

Science Conference Proceedings (OSTI)

Cleveland Abbe (1838-1916) joined the U.S. Signal Service as the government's first chief meteorologist early in 1871. An honor student in chemistry and mathematics, and a trained astronomer, Abbe brought scientific rigor and a far-reaching ...

Edmund P. Willis; William H. Hooke

2006-03-01T23:59:59.000Z

9

STATEMENT OF CONSIDERATIONS REQUEST BY ABB AIR PREHEATER, INC. (ABB) FOR AN ADVANCE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 '94 9:56 FROM DOE-IPLD-CHICAGO 6 '94 9:56 FROM DOE-IPLD-CHICAGO PPGE .002 STATEMENT OF CONSIDERATIONS REQUEST BY ABB AIR PREHEATER, INC. (ABB) FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN INVENTION RIGHTS UNDER ITS SUBCONTRACT WITH NEW YORK STATE ELECTRIC & GAS CO., THE PARTICIPANT IN COOPERATIVE AGREEMENT NO. DE-FC22-92PC-92642; W(A)-93.024, CH-0783 New York State Electric & Gas Co. (NYSEG) was awarded the above-captioned cooper- ative agreement under the fourth round of the Innovative Clean Coal Technology Program pursuant to P.L. 101-512 to demonstrate a combination of cost effective emission reduction and efficiency improvement technologies which will allow utilities to comply with the Clean Air Act Amendments of 1990, at the Milliken Station in Lansing, New York. The cooperative agreement

10

Evaluation of Cracks in ABB HK Arc Chutes  

Science Conference Proceedings (OSTI)

The nuclear power industry has a number of medium voltage (5 Kv-15 Kv) ABB HK air-magnetic circuit breakers with cracks in various places on the ceramic liner plate and cold-molded asbestos portions of the arc chutes. These cracks may or may not be cosmetic. This "jump gap crack" issue has been discussed in several ABB circuit breaker users group meetings. Five utilities (Brunswick, Seabrook, TVA, Duke, and Vogtle) have previously expressed interest in this issue. The present ABB Quality Assurance Proced...

2005-05-03T23:59:59.000Z

11

ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SCADA/EMS System INEEL Baseline Summary Test Report (November SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) This document covers the security evaluation of the "baseline" or "as delivered" system performed in the Idaho National Engineering and Environmental Laboratory (INEEL) SCADA test bed as part of the Critical Infrastructure Test Range Development Program, which is funded by the U.S. Department of Energy; Office of Energy Assurance (DOE/OEA). This report is a nonproprietary version of the report sent to ABB that identified specific issues related to the security vulnerabilities in the ABB SCADA/EMS system. Work was performed by specialists in the fields of control system development, networking, software engineering, and cybersecurity. This

12

ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Energy Utilities Form Consortium to Fund SCADAEMS Cyber Security Assessment at National SCADA Test Bed ABB and Energy Utilities Form Consortium to Fund SCADAEMS Cyber...

13

Hhere Effizienz im Umgang mit Ressourcen bei gleichzeitiger Produktivittssteigerung ABB ist in der Schweiz auf diesem Weg mit weltweit fhrenden energiesparenden Lsungen dabei. Erfahren Sie mehr ber ABB und ihre Energie-und Automatisierungs-Technologien  

E-Print Network (OSTI)

;#12;#12;#12;#12;#12;#12;#12;#12;#12;#12;AGROLA setzt auf Erneuerbare Energie AGROLA folgt dem Weg der Sie mehr ĂŒber ABB und ihre Energie- und Automatisierungs-Technologien unter www.abb.ch © 2007 ABB #12 Erneuer- baren Energie aus Biomasse mit Ă?berzeugung und so ist die EinfĂŒhrung der beiden neuen

14

REQUEST BY ABB POWER GENERATION, INC., FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ABB POWER GENERATION, INC., FOR AN ABB POWER GENERATION, INC., FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN RIGHTS IN SUBJECT INVENTIONS MADE IN THE COURSE OF OR UNDER DEPARTMENT OF ENERGY CONTRACT NO. DE-AC21-95MC30245; DOE WAIVER DOCKET W(A)-95-035[ORO-604] ABB Power Generation, Inc., (ABB) has made a timely request for an advance waiver to worldwide rights in Subject Inventions made in the course of or under Department of Energy (DOE) Contract No. DE-AC21-95MC30245. The scope of the work calls for the completion of the conceptual preliminary design of a selected utility advanced turbine system (ATS), to identify technical barrier issues, and to conduct test programs of prospective conceptual designs that address these issues. The work is sponsored by the Office of Fossil Energy. The dollar amount of the contract is $4,807,507 with ABB cost sharing 25%, or

15

ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security Assessment at National SCADA Test Bed ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security Assessment at National SCADA Test Bed Twelve utilities have formed a consortium with ABB, a supervisory control and data acquisition (SCADA) system vendor, to privately fund advanced research and testing through the U.S. Department of Energy's (DOE) National SCADA Test Bed (NSTB), announced a recent article in the journal Transmission & Distribution World. ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security Assessment at National SCADA Test Bed More Documents & Publications Security is Not an Option ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004)

16

Microsoft PowerPoint - [5] Le Tang - ABB Presentation at DOE HVDC Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVDC Technologies & ABB Experience HVDC Technologies & ABB Experience DOE Workshop - Applications for High-Voltage Direct Current Transmission Technologies Le Tang, ABB , April 22, 2013 In cable > 50 km (>30 miles), most of AC current is needed to charge and discharge In overhead lines > 200 km (>120 miles), most of AC voltage is needed to G G load I C = ωCU 0 U L = ωLI 0 I 0 U 0 I = I 0 - I C U=U 0 -U L Cable Overhead Line C load L Why is DC important in the Transmission Grid ? Capacitance and Inductance of Power Line © ABB Group April 22, 2013 | Slide 2 current is needed to charge and discharge the "C" (capacitance) of the cable most of AC voltage is needed to overcome the "L" (inductance) of the line ⇒ C& L can be compensated by reactors/capacitors or FACTS ⇒ or by use of DC, which means

17

ESS 2012 Peer Review - Superconducting Magnet ESS with Direct Power Electronics Interface - V.R. Ramanan, ABB  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

© ABB Group © ABB Group October 5, 2012 | Slide 1 Superconducting Magnet Energy Storage System with Direct Power Electronics Interface Project Goal  Competitive, fast response, grid-scale MWh superconducting magnet energy storage (SMES) system  Demonstrated through a small scale prototype, (20 kW, 2.5 MJ) and direct connection power electronics converter (with Si-based devices) V.R. Ramanan, ABB US Corporrate Research Center GRIDS SMES SYSTEM SMES Coil MV Feeder Power Converter ABB Brookhaven NL 2G HTS Wire SuperPower MV/LV MV/LV MV/LV HV/MV Wind Park Solar Park Transmission Line Converter & System Design/Prototyping LV Loads University of Houston ABB Project Update  Issues related to SMES system integration being addressed  Project slightly behind schedule; on budget

18

Implementing various lean methodologies and creating a business development plan at an ABB Greenfield site  

E-Print Network (OSTI)

As part of its strategic initiatives, ABB inaugurated a 100,000 sq-m campus for an Engineering, Sourcing, and Manufacturing Operations center in San Luis Potosi (SLP), Mexico in May 2008. The ramp-up of the SLP site ...

Sosa Rangel, Miguel Ernesto

2009-01-01T23:59:59.000Z

19

ABB Response to Smart Grid RFI. November 1, 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response to Smart Grid RFI. November 1, 2010 Response to Smart Grid RFI. November 1, 2010 ABB Response to Smart Grid RFI. November 1, 2010 Thank you for the opportunity to provide information to the Department of Energy Federal Register Doc. 2010-23251 filed September 16, 2010. With our recent acquisition of Ventyx, ABB is one of the few companies in the smart grid space that can approach the entire smart grid value chain, from distributed generation at the residential level to distribution automation and real-time conditioned based maintenance of asset health. Our response will draw on multiple areas of expertise, focusing on the technology side of our industry as well as market direction. Smart Grid RFI. November 1, 2010 More Documents & Publications Galvin Electricity Initiative DOE RFI DOE RFI 2010-23251: Addressing Policy

20

Thermal Performance of the ABB GT24 Combustion Turbine: Peaking Service Experience at GPU Gilbert Station  

Science Conference Proceedings (OSTI)

EPRI's Durability Surveillance (DS) program -- in place since 1991 -- is producing the first in-service performance and operating data on the newest high-efficiency gas turbines. This detailed investigation of the ABB GT24 installed at GPU Genco's Gilbert Station in Milford, New Jersey, is providing plant personnel and the manufacturer with valuable information for solving initial problems. Study results will help all power producers specify, operate, and maintain a new generation of high-performance gas...

1999-12-09T23:59:59.000Z

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

STATEMENT OF CONSIDERATIONS REQUEST BY ABB POWER T&D COMPANY INC., (T&D) FOR AN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ABB POWER T&D COMPANY INC., (T&D) FOR AN ABB POWER T&D COMPANY INC., (T&D) FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN PATENT RIGHTS UNDER DOE COOPERATIVE AGREEMENT NO. DE-FC36-98GO10284; W(A)-98-016; CH-0982 The Petitioner, ABB Power T&D Company, Inc., and on behalf of its alliance team members, Air Products and Chemicals, Inc. (APCI) and Edison Technology Solutions (ETS), has requested a waiver of domestic and foreign patent rights for all subject inventions arising under the above referenced cooperative agreement. The cooperative agreement is entitled, "Development and Demonstration of a 10MVA High Temperature Superconducting Transformer." The objective of this cooperative agreement is to design, build, test, install, and monitor the performance of a prototype 10 MVA high temperature superconducting transformer (HTST). The

22

STATEMENT OF CONSIDERATIONS REQUEST BY ABB LUMMUS GLOBAL, INC. FOR AN ADVANCE WAIVER OF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 2005 16:50 FR IPL DOE CH 630 252 2779 TO AGCP-HQ P.02/03 6 2005 16:50 FR IPL DOE CH 630 252 2779 TO AGCP-HQ P.02/03 * * STATEMENT OF CONSIDERATIONS REQUEST BY ABB LUMMUS GLOBAL, INC. FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN PATENT RIGHTS UNDER A SUBCONTRACT WITH MEMBRANE TECHNOLOGY AND RESEARCH, INC. UNDER DOE COOPERATIVE AGREEMENT NO. DE-FC36-04GO14151 ENTITLED "SEPARATION OF OLEFIN/PARAFFIN MIXTURES WITH CARRIER FACILITATED MEMBRANES" W(A)-05-010; CH-1274 As set out in the attached waiver petition, ABB Lummus Global. Inc. (LGI) has requested an advance waiver of domestic and foreign patent rights for all subject inventions made under the above-identified subcontract by its employees. Referring to item 2 in LGI's waiver petition, this agreement is part of DOE's Chemical Industries of the Future program. Under the agreement LGI has partnered with Membrane

23

2 [ABB  

E-Print Network (OSTI)

Version 1.116 Title word cross-reference (?1, 1) [MY65]. (0, 1) [GS72a]. (b, k) [AC84]. (E,kx,ky) [ZVW + 11].

Nelson H. F. Beebe

2013-01-01T23:59:59.000Z

24

2 [ABB  

E-Print Network (OSTI)

Version 1.115 Title word cross-reference (?1, 1) [MY65]. (0, 1) [GS72a]. (b, k) [AC84]. (E,kx,ky) [ZVW + 11].

Nelson H. F. Beebe

2013-01-01T23:59:59.000Z

25

2 [ABB  

E-Print Network (OSTI)

Version 1.113 Title word cross-reference (?1, 1) [MY65]. (0, 1) [GS72a]. (b, k) [AC84]. (E,kx,ky) [ZVW + 11].

Nelson H. F. Beebe

2013-01-01T23:59:59.000Z

26

ABB Template  

Science Conference Proceedings (OSTI)

... improve grid integration of ? Renewable generation ... win time to start up local generation ? Battery energy storage system (with ... Production: ...

2013-10-25T23:59:59.000Z

27

Data:49adcdaa-ad87-4a41-bbc6-c784aeaf6abb | Open Energy Information  

Open Energy Info (EERE)

adcdaa-ad87-4a41-bbc6-c784aeaf6abb adcdaa-ad87-4a41-bbc6-c784aeaf6abb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Boscobel, Wisconsin (Utility Company) Effective date: 2010/06/01 End date if known: Rate name: General Service Single Phase Sector: Industrial Description: POWER COST ADJUSTMENT CLAUSE (PCAC) All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost power is greater or lesser than the base cost of power purchased or produced. The base cost until changed by the Public Service Commission is $0.0747 per KWH.

28

Data:603f3abb-4342-429c-978c-0670c88794af | Open Energy Information  

Open Energy Info (EERE)

3f3abb-4342-429c-978c-0670c88794af 3f3abb-4342-429c-978c-0670c88794af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bangor, Wisconsin (Utility Company) Effective date: 2010/05/19 End date if known: Rate name: Gs-1 General Service Three Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 50 kilowatts for three or more months in a consecutive 12-month period.

29

Data:19abb7b4-fbe6-4198-8865-f58fe17813d5 | Open Energy Information  

Open Energy Info (EERE)

abb7b4-fbe6-4198-8865-f58fe17813d5 abb7b4-fbe6-4198-8865-f58fe17813d5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Carroll Electric Member Corp Effective date: 2012/02/01 End date if known: Rate name: Outdoor Lighting Overhead Wiring No Existing Wood Pole MV 1000 W Sector: Lighting Description: *IDC Rider Charges included in Fixed Monthly Charge $180 one time charge for instillation Source or reference: http://www.cemc.com/Files/OL-2%20Outdoor%20Lighting%20final%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

30

Data:1373f291-f0ee-45f7-8abb-710bcedb969b | Open Energy Information  

Open Energy Info (EERE)

f0ee-45f7-8abb-710bcedb969b f0ee-45f7-8abb-710bcedb969b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ocmulgee Electric Member Corp Effective date: 1999/05/01 End date if known: Rate name: 250W Type -'HPS-Flood', kWh-100 Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Corporation's specifications. Service will be rendered only at locations that, solely in the opinion of the Corporation, are readily accessible for installation and maintenance. Source or reference: ISU Documentation

31

Data:681a20e7-1609-4716-ab09-9519abb17060 | Open Energy Information  

Open Energy Info (EERE)

e7-1609-4716-ab09-9519abb17060 e7-1609-4716-ab09-9519abb17060 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Edmond, Oklahoma (Utility Company) Effective date: 2009/09/30 End date if known: Rate name: PM-1 Municipal Water Pumping Sector: Commercial Description: Source or reference: http://edmondok.com/DocumentCenter/Home/View/442 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

32

Data:74883c08-aa2f-47ab-b972-528067752eab | Open Energy Information  

Open Energy Info (EERE)

aa2f-47ab-b972-528067752eab aa2f-47ab-b972-528067752eab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New London Electric&Water Util Effective date: 2009/07/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0699 per kilowatt-hour.

33

Data:Abb64835-dbab-4f60-9977-ec9fe654c0df | Open Energy Information  

Open Energy Info (EERE)

Abb64835-dbab-4f60-9977-ec9fe654c0df Abb64835-dbab-4f60-9977-ec9fe654c0df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: Area Lighting - HPS-L 100W Sector: Lighting Description: Public Purposes Rider = base rate x %2.85. Source or reference: http://www.avistautilities.com/services/energypricing/wa/elect/Pages/default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

34

Thermal Performance of the ABB GT24 Gas Turbine in Peaking Servicer at the Gilbert Station of GPU Energy  

Science Conference Proceedings (OSTI)

EPRI's durability surveillance (DS) program, in place since 1991, is producing the first in-service performance and operating data on the newest high-efficiency gas turbines. This detailed investigation of the ABB GT24 installed at GPU Genco's Gilbert Station in Milford, New Jersey, is providing plant personnel and the manufacturer with valuable information for solving initial problems, and will help all power producers specify, operate, and maintain a new generation of high-performance gas turbines.

1998-12-30T23:59:59.000Z

35

Startup and Testing of the ABB GT24 Gas Turbine in Peaking Service at the Gilbert Station of GPU Energy  

Science Conference Proceedings (OSTI)

Worldwide pressures to reduce power generation costs have led domestic and foreign manufacturers to build high-efficiency gas turbines using leading edge technology. To ensure the staying power of these turbines, EPRI launched a multiyear Durability Surveillance Program in 1991 for monitoring advanced industrial gas turbines currently produced by major turbine manufacturers. This report discusses the startup and initial site testing of a new ABB Model GT24 combustion turbine at the Gilbert Station, opera...

1997-12-11T23:59:59.000Z

36

CONFIRMATORY SURVEY RESULTS FOR PORTIONS OF THE ABB COMBUSTION ENGINEERING SITE IN WINDSOR, CONNECTICUT DURING THE FALL OF 2011  

SciTech Connect

From the mid-1950s until mid-2000, the Combustion Engineering, Inc. (CE) site in Windsor, Connecticut (Figure A-1) was involved in the research, development, engineering, production, and servicing of nuclear fuels, systems, and services. The site is currently undergoing decommissioning that will lead to license termination and unrestricted release in accordance with the requirements of the License Termination Rule in 10 CFR Part 20, Subpart E. Asea Brown Boveri Incorporated (ABB) has been decommissioning the CE site since 2001.

Wade C. Adams

2011-12-09T23:59:59.000Z

37

"CONFIRMATORY SURVEY RESULTS FOR THE ABB COMBUSTION ENGINEERING SITE WINDSOR, CONNECTICUT DCN 5158-SR-02-2  

SciTech Connect

The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor?s procedures and FSS results. ORAU reviewed ABB CE?s decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys include gamma surface scans, gamma direct measurements, and soil sampling.

ADAMS, WADE C

2013-03-25T23:59:59.000Z

38

Treatment methods for spent decontamination electrolyte produced in the ABB Atom electrochemical decontamination process ELDECON  

E-Print Network (OSTI)

One of ABB Atom's methods under development, ELDECON, is an electrochemical process for decontamination of components used in nuclear power plants. ELDECON removes radioactive species while producing small amounts of waste. However, the waste sludge that is produced in the ELDECON process contains chromate (Cr 6+), which makes it a mixed waste problem (Cr 6+ and radioactivity) . According to 40 CFR 261, if a process in any step creates chromate, the final waste has to be tested in a toxicity characteristic leachate procedure. In order to pass the test, the chromate have to be reduced to chromium (Cr3+). Electrochemistry has proven to be a valuable tool. When incorporating indirect electrolysis into the ELDECON concept, the chromate (Cr6+) ions are being reduced. This is done by the use of an electrochemical cell (reactor bed). The method involves ferric nitrate as a reagent, which besides converting the chromate completely, also decreases the reaction time. The experiment showed a linear relationship to reduce varying amounts of solution. This makes the test cell feasible to scale up and use in the industry. Ion exchange was also studied as an alternative method of reducing chromate. However, the ion exchange resins investigated were not efficient enough to effectively reduce and exchange the chromate ions.

Carlsson, Charlotta Elisabeth

1995-01-01T23:59:59.000Z

39

Drop Test Results for the Combustion Engineering Model No. ABB-2901 Fuel Pellet Package  

SciTech Connect

The U.S. Nuclear Regulatory Commission (USNRC) contracted with the Packaging Review Group (PRG) at Lawrence Livermore National Laboratory (LLNL) to conduct a single, 30-ft shallow-angle drop test on the Combustion Engineering ABB-2901 drum-type shipping package. The purpose of the test was to determine if bolted-ring drum closures could fail during shallow-angle drops. The PRG at LLNL planned the test, and Defense Technologies Engineering Division (DTED) personnel from LLNL's Site-300 Test Group executed the plan. The test was conducted in November 2001 using the drop-tower facility at LLNL's Site 300. Two representatives from Westinghouse Electric Company in Columbia, South Carolina (WEC-SC); two USNRC staff members; and three PRG members from LLNL witnessed the preliminary test runs and the final test. The single test clearly demonstrated the vulnerability of the bolted-ring drum closure to shallow-angle drops-the test package's drum closure was easily and totally separated from the drum package. The results of the preliminary test runs and the 30-ft shallow-angle drop test offer valuable qualitative understandings of the shallow-angle impact.

Hafner, R S; Mok, G C; Hagler, L G

2004-04-23T23:59:59.000Z

40

Data:9944f743-0abb-4c16-9fb2-4fe2571bab84 | Open Energy Information  

Open Energy Info (EERE)

f743-0abb-4c16-9fb2-4fe2571bab84 f743-0abb-4c16-9fb2-4fe2571bab84 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Industrial Service (750 kW - 2499 kW) Primary Voltage Sector: Industrial Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. All kvar in excess of 40% (93% power factor) of billing demand will be billed at the rate of $0.90 per kvar. Primary voltage discount of $0.35 per kilowatt off of the demand charge. Source or reference: http://www.singingriver.com/Files/I-4.pdf

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Data:01f16663-5074-40ab-b538-ae63426478ad | Open Energy Information  

Open Energy Info (EERE)

3-5074-40ab-b538-ae63426478ad 3-5074-40ab-b538-ae63426478ad No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Evansville, Wisconsin (Utility Company) Effective date: 2012/09/01 End date if known: Rate name: Cp-3 Industrial Power TOD Service above 1,000kW Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0762 per kilowatt-hour.

42

Data:1623468c-13d6-4cbb-96ab-b1008551e6bd | Open Energy Information  

Open Energy Info (EERE)

c-13d6-4cbb-96ab-b1008551e6bd c-13d6-4cbb-96ab-b1008551e6bd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Carroll County REMC Effective date: 2012/04/01 End date if known: Rate name: GENERAL SERVICE - NON DEMAND RATE SCHEDULE Sector: Commercial Description: Facilities Charge - $28.00 Transformer Capacity Charge - kVa $37.5 - $10.00 Energy Charge - All kWh $0.0951 per kWh Source or reference: http://www.cwremc.com/index.php?option=com_content&view=article&id=139&Itemid=86 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

43

Data:4fb36aea-c051-4565-8491-36181abb11fc | Open Energy Information  

Open Energy Info (EERE)

aea-c051-4565-8491-36181abb11fc aea-c051-4565-8491-36181abb11fc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co Effective date: 2011/10/01 End date if known: Rate name: OUTDOOR LIGHTING - ENERGY ONLY DUSK TO DAWN METERED-EO Sector: Lighting Description: RULES AND REGULATIONS: Terms and conditions of this electric rate schedule and the General Rules and Regulations govern use of this service. APPLICATION OF SCHEDULE: This schedule is applicable to all Customers who choose to own, install, and maintain automatically operated dusk-to-dawn outdoor lighting equipment. Under this schedule, the Company will provide only the dusk to dawn electric Energy. EQUIPMENT AND SERVICE OWNERSHIP: The Customer or other third party shall install and own all equipment necessary for service beyond the point of connection with Company's electrical system. The point of connection shall be at the Meter or disconnect switch, for service provided either overhead or underground. The Customer will be responsible for furnishing and installing a master disconnect switch at the point of connection so as to isolate the Customer's equipment from Company's electrical system. The Customer's disconnect switch must be UL-approved or meet National Electric Code standards. The Customer is responsible for the cost of providing maintenance on the equipment it owns. The Company reserves the right to disconnect the Customer's equipment from the Company's electrical system should the Company determine the Customer's lighting equipment is operated or maintained in an unsafe or improper manner.

44

Data:5bb59269-cfea-4ab8-858a-abb9989f4cf7 | Open Energy Information  

Open Energy Info (EERE)

269-cfea-4ab8-858a-abb9989f4cf7 269-cfea-4ab8-858a-abb9989f4cf7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mid-Kansas Electric Company, LLC (MKEC) Effective date: End date if known: Rate name: Residential Service (Residential Space Heating) V2 Sector: Residential Description: To all electric service supplied through one (1) meter for residential purposes. Source or reference: Kelly Call List #6 (V2) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

45

Data:F078ff6f-4411-4cc5-abb2-9627dde68983 | Open Energy Information  

Open Energy Info (EERE)

ff6f-4411-4cc5-abb2-9627dde68983 ff6f-4411-4cc5-abb2-9627dde68983 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alabama Power Co Effective date: 2013/01/01 End date if known: Rate name: 150W High Pressure Sodium Contemporary Style Decorative Post Top Luminaires Sector: Lighting Description: Source or reference: www.alabamapower.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

46

Data:Df653107-895f-4768-982e-31abb4c0b8e4 | Open Energy Information  

Open Energy Info (EERE)

7-895f-4768-982e-31abb4c0b8e4 7-895f-4768-982e-31abb4c0b8e4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Decatur County Rural E M C Effective date: 2010/04/01 End date if known: Rate name: OPTIONAL RENEWABLE ENERGY RIDER FOR Commercial and Industrial Sector: Residential Description: Available to any member of the Corporation with less than 25 kW monthly demand taking service concurrently under Schedule SP Single Phase Electric Service. The Corporation reserves the right to limit the total number of participants under this Rider. In addition to the total charges determined under Rate Schedule SP applicable to the consumer, the following charge shall apply:

47

Data:29525ae8-b216-41a2-88c9-a4abb1260a10 | Open Energy Information  

Open Energy Info (EERE)

b216-41a2-88c9-a4abb1260a10 b216-41a2-88c9-a4abb1260a10 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Effective date: End date if known: Rate name: Outdoor Lighting Metered Existing Pole HPS 250 W Sector: Lighting Description: Source or reference: http://www.consumersenergy.coop/programs.php?pn=Security%20Lights&pl=securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

48

Data:7abb6335-af9f-4c46-b6f4-0d5b1f807dc9 | Open Energy Information  

Open Energy Info (EERE)

abb6335-af9f-4c46-b6f4-0d5b1f807dc9 abb6335-af9f-4c46-b6f4-0d5b1f807dc9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: RS - Schedule A-1 - City of Lakewood - collectively metered apartments Sector: Residential Description: Available for domestic purposes in residences, apartments, duplex houses and multiple family dwellings. Source or reference: www.mytpu.org/customer-service/rates/power-rates/power-rates-schedules.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

49

Data:9cbda9cf-ac90-450e-abb9-8de540098f12 | Open Energy Information  

Open Energy Info (EERE)

cbda9cf-ac90-450e-abb9-8de540098f12 cbda9cf-ac90-450e-abb9-8de540098f12 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Connecticut Light & Power Co Effective date: 2013/07/01 End date if known: Rate name: RATE 116 STREET AND SECURITY LIGHTING Sector: Lighting Description: AVAILABLE for street, highway, off-street and security lighting for "dusk to dawn" or "midnight" lighting services as provided below. Excludes service off the public highway except where the fixture is mounted on a Company owned distribution pole. Flat Rate Buy is Applicable Across Various Wattages & Types of Lights

50

Data:F51a099a-cfc7-44ab-b836-5c0fcc1bdccc | Open Energy Information  

Open Energy Info (EERE)

99a-cfc7-44ab-b836-5c0fcc1bdccc 99a-cfc7-44ab-b836-5c0fcc1bdccc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lexington, Tennessee (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Small Commercial Sector: Commercial Description: Available to the non-residential customer with monthly demand of 50 kW or less. Service under this Schedule shall be used solely by the contracting Customer in a single enterprise, located entirely on a single site. Source or reference: http://www.lexingtonnc.net/modules/showdocument.aspx?documentid=413 Source Parent: Comments

51

Data:36179abb-221d-4a67-a569-1a94d7ec6d09 | Open Energy Information  

Open Energy Info (EERE)

79abb-221d-4a67-a569-1a94d7ec6d09 79abb-221d-4a67-a569-1a94d7ec6d09 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nevada Power Co Effective date: 2012/04/01 End date if known: Rate name: DEFERRED ENERGY ACCOUNTING ADJUSTMENT Sector: Description: APPLICABLE The monthly energy charges for service otherwise applicable under each of the Utility's rate schedules shall be increased or decreased by an adjustment amount in accordance with the authorized Deferred Energy Accounting Adjustment rate specified below Source or reference: https://www.nvenergy.com/company/rates/nnv/electric/schedules/images/DEAA_Electric_North.pdf

52

Data:3992aa71-e30c-4456-9d4d-b6ed0f421abb | Open Energy Information  

Open Energy Info (EERE)

aa71-e30c-4456-9d4d-b6ed0f421abb aa71-e30c-4456-9d4d-b6ed0f421abb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Corn Belt Energy Corporation Effective date: 2006/08/31 End date if known: Rate name: RATE 10 ELECTRIC HEAT FOR RESIDENTIAL & FARM SERVICE Sector: Residential Description: Applicable to residential and farm consumers for electric space heating, subject to the established rules and regulations of the Cooperative. Service under this schedule is limited to installations requiring not more than 400-amp service. Approval of the Cooperative must be obtained prior to installation of any motor requiring starting current in excess of 260 amperes.

53

Data:22f32cbc-3903-46bb-bb67-abb0359ca3f9 | Open Energy Information  

Open Energy Info (EERE)

cbc-3903-46bb-bb67-abb0359ca3f9 cbc-3903-46bb-bb67-abb0359ca3f9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Kittitas County Effective date: End date if known: Rate name: Commercial Wind Power Service- With Plant Investment Sector: Description: Available for services receiving power at 34.5 kV or above, transmissions and sub-transmission capacity. Source or reference: http://www.kittitaspud.com/rate_schedule.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

54

Data:F175ca11-667f-4458-bbfc-abb341c412a3 | Open Energy Information  

Open Energy Info (EERE)

5ca11-667f-4458-bbfc-abb341c412a3 5ca11-667f-4458-bbfc-abb341c412a3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Parallel Generation (20kW or less) - Net Energy Billing Sector: Residential Description: Available for single-phase and three-phase customers where a part or all of the electrical requirements are supplied by the customers' generating facilities, where such facilities have a total generating capability of 20 kW or less, where such facilities are connected in parallel with the utility and where such facilities are approved by the utility.

55

Data:6ddc1e74-5abb-407a-843a-93e257b0ba44 | Open Energy Information  

Open Energy Info (EERE)

ddc1e74-5abb-407a-843a-93e257b0ba44 ddc1e74-5abb-407a-843a-93e257b0ba44 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Groton, South Dakota (Utility Company) Effective date: End date if known: Rate name: Schedule A - Load Management Participating Residential Rates Sector: Residential Description: Schedule A - Load Management Participating Residential Rates Minimum Bill - $20/month which includes 1-100 kwh Next 900 kwh at $.125 per kwh Over 1000 kwh at $.0975 per kwh Source or reference: http://city.grotonsd.gov/electric.html Source Parent: Comments Applicability Demand (kW) Minimum (kW):

56

Data:E0405081-abb7-4b6d-b3b1-c318275fb11a | Open Energy Information  

Open Energy Info (EERE)

081-abb7-4b6d-b3b1-c318275fb11a 081-abb7-4b6d-b3b1-c318275fb11a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Holy Cross Electric Assn, Inc Effective date: 2011/07/01 End date if known: Rate name: STREET, HIGHWAY AND AREA LIGHTING: All 75 watt Street Lights & Under Sector: Lighting Description: This rate applies when all fixtures are owned by the consumer and mounted on their poles or decorative standards. Source or reference: http://www.holycross.com/about-us/rates-charges Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

57

Data:Db4abe55-b47a-4ec5-abb7-e61b3930b67a | Open Energy Information  

Open Energy Info (EERE)

abe55-b47a-4ec5-abb7-e61b3930b67a abe55-b47a-4ec5-abb7-e61b3930b67a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ark Valley Elec Coop Assn, Inc Effective date: End date if known: Rate name: Irrigation Service Sector: Industrial Description: * Annual Horsepower Charge $5.50 per HP Source or reference: http://www.arkvalley.com/content/electric-rate-schedules Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

58

Data:226d2d77-ac3f-4abb-843d-0161b7e36a62 | Open Energy Information  

Open Energy Info (EERE)

d2d77-ac3f-4abb-843d-0161b7e36a62 d2d77-ac3f-4abb-843d-0161b7e36a62 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2000/11/01 End date if known: Rate name: AREA LIGHTING 400 watt wide angle high pressure sodium Sector: Lighting Description: Available to all customers for dusk to dawn outdoor area lighting not served under street lighting contract. Service under this schedule is also available for television amplifiers for cable systems, and other flat rate services. Special Poles $1.00 per month Source or reference: http://www.tpud.org/servicesAndBilling/rateSchedules/rateSchedules_Light.aspx

59

Data:26c3a88f-3469-401a-bb16-92138ca7e658 | Open Energy Information  

Open Energy Info (EERE)

f-3469-401a-bb16-92138ca7e658 f-3469-401a-bb16-92138ca7e658 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mid-Kansas Electric Company, LLC (MKEC) Effective date: End date if known: Rate name: Residential Service (Residential General Use) Sector: Residential Description: To all electric service supplied through one (1) meter for residential purposes. Source or reference: Kelly Call List #6 (V2) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

60

Data:Ed342731-0163-43ab-b983-6eda3e8e087c | Open Energy Information  

Open Energy Info (EERE)

31-0163-43ab-b983-6eda3e8e087c 31-0163-43ab-b983-6eda3e8e087c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: OL "HPS" 150 Watt (Enclosed) (Customer owned w/o maintanence) 69 kW Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Data:50e235fe-cb44-491f-b45c-7a91abbe9527 | Open Energy Information  

Open Energy Info (EERE)

fe-cb44-491f-b45c-7a91abbe9527 fe-cb44-491f-b45c-7a91abbe9527 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Story City, Iowa (Utility Company) Effective date: 2004/01/01 End date if known: Rate name: High Pressure sodium - 1000 - Not metered Sector: Lighting Description: Source or reference: Ted binder 1 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

62

Data:44a2d8dd-b42e-4abb-8ef7-77efc7886686 | Open Energy Information  

Open Energy Info (EERE)

b42e-4abb-8ef7-77efc7886686 b42e-4abb-8ef7-77efc7886686 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sumter Electric Member Corp Effective date: 2012/01/01 End date if known: Rate name: Outdoor Lighting Off- Roadway HPS 250 W w/ Aid Sector: Lighting Description: * Fixed Monthly Charge does not include monthly pole rate charges Source or reference: http://www.sumteremc.com/pdfs/OL-9.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

63

Data:8a6abb39-e242-4cf3-aa58-0b883fdd2815 | Open Energy Information  

Open Energy Info (EERE)

abb39-e242-4cf3-aa58-0b883fdd2815 abb39-e242-4cf3-aa58-0b883fdd2815 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc Effective date: End date if known: Rate name: Residential Green Power Sector: Residential Description: *$0.0259 more than monthly residential rate for 100 kWh block of green energy Source or reference: http://www.fec-co.com/svcmembers.htm#securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

64

Data:361844cd-12f3-49ab-b299-14b94674ee76 | Open Energy Information  

Open Energy Info (EERE)

2f3-49ab-b299-14b94674ee76 2f3-49ab-b299-14b94674ee76 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clinton County Elec Coop, Inc Effective date: 2013/02/01 End date if known: Rate name: Schedule 23L - ANNEXATION AREA - THREE-PHASE SERVICE - LARGE Sector: Commercial Description: (a) Available to members of the Cooperative for residential, farm, public building, commercial and industrial requiring single phase service or three phase service subject to the Cooperative's established rules and regulations and rates as established or as may from time to time be adopted by the seller.

65

Data:53cb8390-cbec-4a5a-bb44-b5722734739d | Open Energy Information  

Open Energy Info (EERE)

-cbec-4a5a-bb44-b5722734739d -cbec-4a5a-bb44-b5722734739d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Florence Utility Comm Effective date: 2009/11/30 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day Three Phase 7am-7pm with Parallel Generation(20 kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0791 per kilowatt-hour. Parallel Generation (20 kW or less) Net Energy Billing - Available for single-phase and three-phase customers where a part or all of the electrical requirements of the customer are supplied by the customer's generating facilities, where such facilities have a total generating capability of 20 kW or less, where such facilities are connected in parallel with the utility and where such facilities are approved by the utility. Rate: The customer shall be billed monthly on a net energy basis and shall pay the fixed charge and energy charge specified in the rate schedule under which he is served. If, in any month, the customer's bill has a credit balance of $25 or less, the amount shall be credited to subsequent bills until a debit balance is reestablished. If the credit balance is more than $25, the utility shall reimburse the customer by check upon request. Monthly credits shall be computed by taking the net excess kilowatt-hours produced times the sum of the applicable energy charge plus monthly power cost adjustment clause (PCAC). This rate will be applied to residential single-phase and three-phase customers for ordinary household purposes. Single-phase motors may not exceed 5 horsepower individual-rated capacity without utility permission.

66

Data:Abb22900-14f1-4c75-8bf8-368dc0b56aca | Open Energy Information  

Open Energy Info (EERE)

Abb22900-14f1-4c75-8bf8-368dc0b56aca Abb22900-14f1-4c75-8bf8-368dc0b56aca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kiel, Wisconsin (Utility Company) Effective date: 2011/05/06 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 40kW and 200kW Demand Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0754 per kilowatt-hour.

67

Data:F26095e8-2e52-4a9a-bb85-f800157599ff | Open Energy Information  

Open Energy Info (EERE)

6095e8-2e52-4a9a-bb85-f800157599ff 6095e8-2e52-4a9a-bb85-f800157599ff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Morganton, North Carolina (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Large Commercial Service Sector: Commercial Description: Non Residential Customer/ 150-500 kW Minimum Demand 150 kW Demand Charges: Summer Demand Charge: $20.00/kW Summer Excess Demand: $5.00/kW Non-Summer Demand Charge: $10.50/kW Non-Summer Excess Demand: $8.00/kW Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/212/Morganton%20NC.pdf

68

Data:B0080cae-71ef-40ab-b122-e700eaf82bd9 | Open Energy Information  

Open Energy Info (EERE)

cae-71ef-40ab-b122-e700eaf82bd9 cae-71ef-40ab-b122-e700eaf82bd9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Halifax Electric Member Corp Effective date: 2012/10/01 End date if known: Rate name: SECURITY LIGHTING 400-watt high-pressure sodium Sector: Lighting Description: AVAILABILITY: This Schedule is available in all territory served by the Cooperative, subject to its established Service Rules and Regulations. APPLICABILITY: This Schedule is applicable to any consumer served by the Cooperative ADJUSTMENT RIDERS AND TAXES: The Cooperative's approved Wholesale Power and TIER Adjustment, as well as the current North Carolina State Sales Tax, shall be applicable to all service supplied under this Schedule. Each lamp, since its power supply is un-metered, shall have a monthly estimated usage assigned for billing purposes as follows: 400-watt high-pressure sodium lamp - 160 kWh per month

69

Data:3c49000a-f0aa-410f-aa9b-41c4c5c68abb | Open Energy Information  

Open Energy Info (EERE)

9000a-f0aa-410f-aa9b-41c4c5c68abb 9000a-f0aa-410f-aa9b-41c4c5c68abb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bonners Ferry, Idaho (Utility Company) Effective date: 2009/10/01 End date if known: Rate name: Self Consumed with Demand: B1PO Sector: Industrial Description: Note: $10.00 added to Fixed monthly charge if Remote Read Device is used. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

70

Data:1ea9d25f-ccbc-47ab-b3b6-b41a73d54909 | Open Energy Information  

Open Energy Info (EERE)

d25f-ccbc-47ab-b3b6-b41a73d54909 d25f-ccbc-47ab-b3b6-b41a73d54909 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Foley Board of Utilities Effective date: 2012/03/01 End date if known: Rate name: Unmetered Ornamental Lighting- Acorn or Coach Lantern- 12000 Lumen Metal Halide with Octagonal Concrete Pole Sector: Lighting Description: This rate is available to any municipality in which the Utility operates the local electric distribution system or to Baldwin County or to the State of Alabama for service along any highway adjacent to an electric distribution system of the Utility. Source or reference: http://www.rivierautilities.com/pdf/rates/rate_610_2012_03.pdf

71

Data:1daa5b81-96aa-4f0a-9abb-2e254c8cd2ba | Open Energy Information  

Open Energy Info (EERE)

b81-96aa-4f0a-9abb-2e254c8cd2ba b81-96aa-4f0a-9abb-2e254c8cd2ba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Ohio (Utility Company) Effective date: End date if known: Rate name: Street Lighting ornamental, 700w mv(E and M), 30 ft steel pole Sector: Lighting Description: street lighting,ornamental mercury vapor 700 watt(E and M) with maximum 280kwh per lamp. Source or reference: http://www.cpp.org/CPP%20RRR%20ORDINANCE%20as%20of%2011-14-06.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

72

Data:426ab71b-5e19-4f5d-abb5-2ef2e64e28cb | Open Energy Information  

Open Energy Info (EERE)

ab71b-5e19-4f5d-abb5-2ef2e64e28cb ab71b-5e19-4f5d-abb5-2ef2e64e28cb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeastern Rural E M C Effective date: 2012/02/27 End date if known: Rate name: RIDER 30-10 SMALL COMMERCIAL ENERGY STORAGE SERVICE (Single Phase) Sector: Commercial Description: This rider is available to customers of Northeastern REMC (Northeastern) who are eligible for andreceive service under Schedules 30-8 or 30-9 (Small Commercial Service - Single Phase and Three Phase respectively). This rider is for electric thermal storage (ETS) systems capable of storing energy during

73

Data:7593ae0c-a1fd-4b7a-86ab-b37a292d8c6d | Open Energy Information  

Open Energy Info (EERE)

ae0c-a1fd-4b7a-86ab-b37a292d8c6d ae0c-a1fd-4b7a-86ab-b37a292d8c6d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Indiana Pub Serv Co Effective date: 2011/12/27 End date if known: Rate name: Metal Melting Service Sector: Industrial Description: TO WHOM AVAILABLE This is a rate for customers who have substantial requirement for electric metal melting and/or holding equipment. Total capacity to be made available under this rate is limited to 100 Megawatts. This Rate Schedule is available to Industrial Customers with electric metal melting and/or holding equipment and an on-peak demand that is less than 50% of the off-peak period and is located adjacent to existing electric facilities adequate to meet the Customer's requirements. A Customer requesting service hereunder is required to contract for a specific amount of electrical capacity which shall be not less than 500 kilowatts. The Company shall not supply demand in excess of 12,000 kilowatts under this schedule. The Company shall not be obligated to supply capacity in excess of that specified in the contract.

74

Data:Adae2e5a-c205-4ed9-abb9-0fd35eb235a6 | Open Energy Information  

Open Energy Info (EERE)

Adae2e5a-c205-4ed9-abb9-0fd35eb235a6 Adae2e5a-c205-4ed9-abb9-0fd35eb235a6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Williams - AZ, Arizona (Utility Company) Effective date: End date if known: Rate name: Residential Service (E 12) Sector: Description: Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

75

Data:9722a682-f269-48ab-b5db-beea974da782 | Open Energy Information  

Open Energy Info (EERE)

82-f269-48ab-b5db-beea974da782 82-f269-48ab-b5db-beea974da782 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeastern Indiana R E M C Effective date: 2010/05/01 End date if known: Rate name: SECURITY LIGHTING SERVICES: 100W Metal Halide Sector: Lighting Description: Dusk till Dawn Lighting Service Source or reference: http://www.seiremc.com/2006/rate_sch/2010/SLSecurityLightingService-5-1-10.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

76

Data:30a552c6-df41-422a-bb1a-fe4cc6f769c0 | Open Energy Information  

Open Energy Info (EERE)

c6-df41-422a-bb1a-fe4cc6f769c0 c6-df41-422a-bb1a-fe4cc6f769c0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Ohio (Utility Company) Effective date: End date if known: Rate name: Large Industrial Rate Schedule Sector: Industrial Description: Source or reference: http://www.cpp.org/CPP%20RRR%20ORDINANCE%20as%20of%2011-14-06.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

77

Data:32b0abb8-a929-4537-b5ed-ab1155e4aa0b | Open Energy Information  

Open Energy Info (EERE)

abb8-a929-4537-b5ed-ab1155e4aa0b abb8-a929-4537-b5ed-ab1155e4aa0b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ameren Illinois Company Effective date: 2010/11/19 End date if known: Rate name: DS-3 and BGS-3 Zone 1 - General Delivery Service Above 100kV Sector: Industrial Description: Availability: Service under this Rate is available for any eligible Non-Residential Customer within the territory served by Company that has demand metering installed and a maximum monthly Demand equal to or greater than 150 kilowatts (kW) but less than 1,000 kW as qualified in the Delivery Service Rate Reassignment section.

78

Data:Cc27a182-9c18-459a-bb0c-cf017c083cd7 | Open Energy Information  

Open Energy Info (EERE)

7a182-9c18-459a-bb0c-cf017c083cd7 7a182-9c18-459a-bb0c-cf017c083cd7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Long Island Power Authority Effective date: 2012/03/05 End date if known: Rate name: D883 (Residential Water and Home Heating with Heat Pump) Sector: Residential Description: Applies to customers who use electricity for both water and space heating with an electric heat pump, with the exception of fireplaces and coal/wood burning stoves, and account must have been established after January 26, 1983. If your account is billed on a discounted Household Assistance Rate, the rate number is preceded by a "D" and the rate description will include "Household Assistance."

79

Data:1524a36e-1c22-4219-81ab-b230eae8532a | Open Energy Information  

Open Energy Info (EERE)

a36e-1c22-4219-81ab-b230eae8532a a36e-1c22-4219-81ab-b230eae8532a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota Effective date: 2012/05/01 End date if known: Rate name: STREET LIGHTING SYSTEM SERVICE 100W High Pressure Sodium Overhead Sector: Lighting Description: Available for year-round illumination of public streets, parkways, and highways by High Pressure Sodium (HPS) or Metal Halide electric lamps in luminaires supported on poles, where the facilities for this service are furnished by Company. Underground Service under this schedule is limited to areas having a Company owned underground electric distribution system. Standard Service includes a monthly payment for the lighting system cost. Pre-Pay Option requires customer payment for the lighting system cost before establishing service.

80

Data:8067abb5-b59d-4e51-acf4-9626fe3a05f3 | Open Energy Information  

Open Energy Info (EERE)

abb5-b59d-4e51-acf4-9626fe3a05f3 abb5-b59d-4e51-acf4-9626fe3a05f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Medford, Wisconsin (Utility Company) Effective date: 1997/06/27 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service between 200kW and 1,000kW Demand 9am-9pm Transformer Ownership Discount Sector: Industrial Description: This rate will be applied to customers for all types of service if their monthly maximum demand is in excess of 200kW but not greater than 1,000kW for 3 months in a consecutive 12-month period. Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0351 per kilowatt-hour.

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Data:3d1fcecf-c3cf-4ea6-afa4-3107581abb92 | Open Energy Information  

Open Energy Info (EERE)

fcecf-c3cf-4ea6-afa4-3107581abb92 fcecf-c3cf-4ea6-afa4-3107581abb92 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland, Washington (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Schedule 70: Security Lighting Unmetered Residential - 250 Watt or less Sector: Lighting Description: A. Availability: In all territory served by the City's electric utility. B. Applicability: To all property owners or long-term leasees of property. C. Contract Provisions: The rates in this schedule apply to facilities consisting of overhead construction with mast arms and luminaries mounted on wood poles with lumen output as shown. Lighting facilities supplied under this schedule shall remain the property of the City, and shall be supplied only pursuant to a contract with the customer, the term of which shall be a period of not less than three (3) years.

82

Data:B53e1c4d-4abb-4d3e-ade2-8b6dbbdc091c | Open Energy Information  

Open Energy Info (EERE)

c4d-4abb-4d3e-ade2-8b6dbbdc091c c4d-4abb-4d3e-ade2-8b6dbbdc091c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stilwell, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Heavy Industrial-over 100,000 kWh Sector: Industrial Description: Cost + energy charge Source or reference: www.cityofstilwell.com/uploads/Ordinance_297__Water__Sewer__Electric_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

83

Data:54348949-b8a2-49ca-abb7-f9a4b6a2a526 | Open Energy Information  

Open Energy Info (EERE)

49-b8a2-49ca-abb7-f9a4b6a2a526 49-b8a2-49ca-abb7-f9a4b6a2a526 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wisconsin Rapids W W & L Comm Effective date: 2009/01/01 End date if known: Rate name: Small Power Service TOU Sector: Industrial Description: This rate will be available on an optional basis to customers for all types of service if their monthly Maximum Measured Demand is in excess of 50 kilowatts (kW) per month for three or more months in a consecutive 12-month period, but not greater than 200 kW per month for three or more months in a consecutive 12-month period. Fixed monthly charge: Customer Charge ($30.00) + Public Benefits Charge ($10.00).

84

Data:Bb1aec2f-1abb-47a7-a8ca-813778d17c3f | Open Energy Information  

Open Energy Info (EERE)

aec2f-1abb-47a7-a8ca-813778d17c3f aec2f-1abb-47a7-a8ca-813778d17c3f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Greenwood Commissioners-Pub Wk Effective date: 2008/09/01 End date if known: Rate name: Large Commercial service rate Sector: Commercial Description: MINIMUM CHARGE: The minimum monthly charge shall be the "Facility Charge". The following Tiered Demand Charge schedule is applied: First 30 kW of Billing Demand ................................... $1.890 Per kW. All Over 30 kW of Billing Demand ............................. $2.956 Per kW. DETERMINATION OF BILLING DEMAND: The "Billing Demand" for the billing period shall be the maximum integrated thirty minute demand recorded during the billing period for which the bill is rendered.

85

Data:573e8538-eef8-41ab-b576-32f3d13c0410 | Open Energy Information  

Open Energy Info (EERE)

e8538-eef8-41ab-b576-32f3d13c0410 e8538-eef8-41ab-b576-32f3d13c0410 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Clintonville, Wisconsin (Utility Company) Effective date: 2006/05/05 End date if known: Rate name: Gs-3 Large General Service Single Phase Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0680 per kWh. See schedule PCAC.

86

Data:7f0301ab-b8f6-442e-bb87-e115ff1332e8 | Open Energy Information  

Open Energy Info (EERE)

01ab-b8f6-442e-bb87-e115ff1332e8 01ab-b8f6-442e-bb87-e115ff1332e8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Burlington-Electric, Vermont (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Large General (LG) Rate Demand is less than 25KW- Net Metered Renewable Energy Source Rider Sector: Industrial Description: Service under this rate is supplied for all purposes where energy consumption is 3,000 kWh per month or above (or greater than or equal to 100 kWh per day) for 3 consecutive months out of the last 12 months, or at the request of the customer.

87

Data:6d4bc9cb-70c2-49ab-b9b8-2fe1caa35fcd | Open Energy Information  

Open Energy Info (EERE)

cb-70c2-49ab-b9b8-2fe1caa35fcd cb-70c2-49ab-b9b8-2fe1caa35fcd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Arrowhead Electric Coop, Inc Effective date: 2012/07/17 End date if known: Rate name: Off Peak Water Storage Sector: Description: This rate is applicable for customers who have General Service. Usage under this rate would be tracked by a 2nd meter. Source or reference: Illinois State University Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

88

Data:Ecc95e82-d30d-471e-b2ab-b3a465d824bd | Open Energy Information  

Open Energy Info (EERE)

Ecc95e82-d30d-471e-b2ab-b3a465d824bd Ecc95e82-d30d-471e-b2ab-b3a465d824bd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Foley Board of Utilities Effective date: 2012/03/01 End date if known: Rate name: Public Street and Highway Lighting- Utility-Owned Fixtures- 25,500 Lumen High Pressure Sodium Sector: Lighting Description: This rate is available to any municipality in which the Utility operates the local electric distribution system or to Baldwin County or to the State of Alabama for service along any highway adjacent to an electric distribution system of the Utility. Source or reference: http://www.rivierautilities.com/pdf/rates/rate_610_2012_03.pdf

89

Data:163a78c3-da63-485a-bb8c-64aa1836b3a5 | Open Energy Information  

Open Energy Info (EERE)

c3-da63-485a-bb8c-64aa1836b3a5 c3-da63-485a-bb8c-64aa1836b3a5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Holyoke, Massachusetts (Utility Company) Effective date: 2009/08/12 End date if known: Rate name: GENERAL SERVICE ELECTRIC SCHEDULE (RESIDENTIAL) Sector: Residential Description: Additional Info: Following rate(s) apply: First 200 Hrs. Times Demand First 3,000 kWh at .1181 per kWh Next 12,000 kWh at .1096 per kWh Next 85,000 kWh at .1033 per kWh All over 100,000 kWh at .0949 per kWh Next 200 Hrs. Times Demand (100 KW Minimum) at .0878 per kWh All over 400 Hrs. Times Demand (100 KW Minimum) at .0728 per kWh

90

Data:Db114796-1f6d-41ab-b6ab-d623cfdc55f1 | Open Energy Information  

Open Energy Info (EERE)

Db114796-1f6d-41ab-b6ab-d623cfdc55f1 Db114796-1f6d-41ab-b6ab-d623cfdc55f1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Edgecombe-Martin County E M C Effective date: 2006/08/01 End date if known: Rate name: SUBDIVISION STREET LIGHTING SCHEDULE HPS 250 W 4 Lots Sector: Lighting Description: 4 lots per light Type: HPS 250 W AVAILABILITY: Available in all territory served by the Cooperative, subject to the Cooperative's established Service Rules and Regulations. This is an experimental rate. Participation is limited to four developments during the first year trial period. APPLICABILITY: This schedule is applicable for lighting of residential streets within residential subdivisions. Applicability is limited to residential subdivisions consisting of single family dwellings where permanent electric facilities have been installed, located outside of the corporate limits of a city or town where installations are not prevented or regulated by any governmental unit having jurisdiction.

91

Data:52d743f4-7dd5-4b20-89fb-4abb6a8707b7 | Open Energy Information  

Open Energy Info (EERE)

3f4-7dd5-4b20-89fb-4abb6a8707b7 3f4-7dd5-4b20-89fb-4abb6a8707b7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Etna Green, Indiana (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Muncipal Service - Non Metered Demand- Single Phase Sector: Commercial Description: Source or reference: http://www.timesuniononline.com/print.asp?ArticleID=50294&SectionID=52&SubSectionID=277 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

92

Data:9b14761f-2df2-4086-abb3-3bc8175617e2 | Open Energy Information  

Open Energy Info (EERE)

f-2df2-4086-abb3-3bc8175617e2 f-2df2-4086-abb3-3bc8175617e2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Medford, Wisconsin (Utility Company) Effective date: 1997/06/20 End date if known: Rate name: Gs-2 Residential Three Phase Optional Time-of-Day Service 9am-9pm with Parallel Generation(20kW or less) Sector: Residential Description: This rate schedule is optional to all Residential Service, Rg-1 and General Service Gs-1, customers. Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0351 per kilowatt-hour.

93

Data:0b575fce-53a1-4de3-abb8-30f70dd92b14 | Open Energy Information  

Open Energy Info (EERE)

fce-53a1-4de3-abb8-30f70dd92b14 fce-53a1-4de3-abb8-30f70dd92b14 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2012/10/11 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL - HPS 100W Sector: Lighting Description: Source or reference: www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory PDFs/psco_elec_entire_tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

94

Data:557ed88b-9a43-4fac-abb2-6c8de9b501c3 | Open Energy Information  

Open Energy Info (EERE)

ed88b-9a43-4fac-abb2-6c8de9b501c3 ed88b-9a43-4fac-abb2-6c8de9b501c3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Plains Electric Coop Effective date: 2012/02/01 End date if known: Rate name: OUTDOOR LIGHTING SERVICE-175 W MV (Unmetered) Sector: Lighting Description: Availability Available for year-round illumination for private residential, business, or farm yard lighting on existing Cooperative service poles where service wires can be connected either on the source or load side of the consumer's meter, at discretion of the Cooperative. Service is subject to the established rules and regulations of the Cooperative. Type of Service The Cooperative shall own, operate, and maintain the security lighting system using the Cooperative's standard security lighting equipment.

95

Data:87074f52-f5b3-4087-91ab-b230a0ddc043 | Open Energy Information  

Open Energy Info (EERE)

f52-f5b3-4087-91ab-b230a0ddc043 f52-f5b3-4087-91ab-b230a0ddc043 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elroy, Wisconsin (Utility Company) Effective date: 2001/05/21 End date if known: Rate name: Pgs-2 Customer-Owned Generation Systems (Greater than 20kW) Sector: Description: Available for single-phase and three-phase where part or all of the electrical requirements of the customer are supplied by the customer's generating facilities, where such requirements of the customer are supplied by the customer's generating facilities have a total generating capacity of greater than 20kW and less than or equal to 100kW, where such facilities are connected in parallel with the utility. Customers not desiring to sell energy under this rate have the right to negotiate a buy-back rate.

96

RFI Comments - ABB  

Science Conference Proceedings (OSTI)

... However it is primarily focused on handling incidents with the process under control (eg process conditions like boiler temperature or pressure ...

2013-04-09T23:59:59.000Z

97

2012 SG Peer Review - Real-Time Distribution Feed Performance Monitoring, Advisory Control, and Health Management System - James Stoupis, ABB Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Real-Time Distribution Feeder Performance Real-Time Distribution Feeder Performance Monitoring, Advisory Control, and Health Management System James Stoupis ABB Inc., US Corporate Research Center June 7, 2012 December 2008 Real-Time Distribution Feeder Performance Monitoring Objective Life-cycle Funding Summary ($K) Prior to FY 12 FY12, authorized FY13, requested Out-year(s) $200 k $1.1 M $1.3 M $400k Technical Scope To innovatively leverage advanced sensing, monitoring, and control technologies to enhance asset utilization and grid reliability Install state-of-the-art data collection, monitoring, and sensing equipment in distribution substations and on distribution feeders Develop new feeder monitoring, advisory control, and asset health applications deployed on current circuits, and future circuits with DERs

98

Data:7c1af265-7ea3-48f7-b808-e02673a0abb1 | Open Energy Information  

Open Energy Info (EERE)

af265-7ea3-48f7-b808-e02673a0abb1 af265-7ea3-48f7-b808-e02673a0abb1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jacksonville Electric Authority Effective date: 2011/10/01 End date if known: Rate name: CS Curtailable Service Rider Option A Primary Service Discount Sector: Description: For service taken at 4160 - 69000 volts, when the customer provides all the equipment required to take service at JEA's existing primary lines. To customers eligible for Rate Schedules SS or GSLD who have executed a Curtailable Service Agreement with JEA. The customer agrees during a period of requested curtailment to curtail a minimum load of 200 kW. All service hereunder will be rendered through a single metering installation. Resale of energy purchased under this rider is not permitted. JEA reserves the right to limit the total load served under this rider. Curtailable service under this rate schedule is subject to curtailment during any time period that electric power and energy delivered hereunder from JEA's available generating resources is required to a) maintain service to JEA's firm power customers and firm power sales commitments, or b) supply emergency interchange service to another utility for its firm load obligations only, and c) when the price of power available to JEA from other sources exceeds 30 cents per kWh. The following charges are applicable to the curtailable portion of the customer's load only. The kW demand and kWh consumption not exceeding the Contracted Non-Curtailable demand shall be billed according to the terms and conditions of the JEA's standard GSLD Rate Schedule.

99

Data:Ba2c55ad-e6d5-4f50-abb2-919e9511d0eb | Open Energy Information  

Open Energy Info (EERE)

c55ad-e6d5-4f50-abb2-919e9511d0eb c55ad-e6d5-4f50-abb2-919e9511d0eb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kankakee Valley Rural E M C Effective date: 2012/05/01 End date if known: Rate name: Rate Schedule OSL: Ornamental Street Lighting Service 175 watt MV Sector: Lighting Description: AVAILABILITY: Available to any Property Owner's Association (P.O.A.) served by the REMC with continuous, year-round service for outdoor lighting where 120 volt service exists ahead of the meter loop. CHARACTER OF SERVICE: Only power service is available under this schedule. Power service is for lighting service where the REMC supplies only un-metered capacity and energy required for area lighting service. The developer or property owners' association is responsible for the installation, operation and maintenance of the lighting equipment. Any additional investment required by the extension of secondary lines, or hanging of a transformer, or installation of additional poles for the sole purpose of this service, will require a contribution by the P.O.A. The lighting equipment remains the property of the developer or property owners' association and the REMC will not be responsible for any costs of operating and maintaining such equipment.

100

Data:4e7dac5c-83ee-4c1c-abb8-132ccadd6501 | Open Energy Information  

Open Energy Info (EERE)

dac5c-83ee-4c1c-abb8-132ccadd6501 dac5c-83ee-4c1c-abb8-132ccadd6501 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Cowlitz County Effective date: 2012/04/01 End date if known: Rate name: RESIDENTIAL SERVICE SCHEDULE DDR-2 Three Phase Sector: Residential Description: Applicable to all domestic uses in single-family residences, individual apartments or small farms, supplied through a single meter and one Point of Delivery; provided that equipment and installations for space and water heating shall be subject to approval of the District. BASIC REQUIREMENTS 1. The Customer must occupy the subject premises and have been signed for service as a Cowlitz PUD residential electric customer for not less than the past 12 consecutive months. 2. The Customer must provide proof of a disability: * Qualify for special parking privileges under RCW 46.16.381(1) (a through h) or are a blind person as defined in RCW 74.18.020(4), or * Earn an SSDI income, or * Provide a physician's certification that they are disabled, handicapped, or an incapacitated person as defined under RCW 71A.10.020 (3) or any other existing state or federal program. 3. Annual gross household income is: Persons in Household Gross Household Income 1 - 2 $14,710 - $22,065 3 $18,530 - $27,795 4 $22,350 - $33,525 5+ $26,170 - $39,255 4. The Customer must meet the requirements listed in the Low-Income Disabled Citizen Discounted Rate Eligibility Guidelines, as required by the District.

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Final Report-Confirmatory Survey Results for the ABB Combustion Engineering Site, Windsor, Connecticut; Revision 1 (DCN 5158-SR-02-1) (Docket No. 030-03754; RFTA No. 12-003)  

SciTech Connect

The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor?s procedures and FSS results. ORAU reviewed ABB CE?s decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys included gamma surface scans, gamma direct measurements, and soil sampling.

ADAMS, WADE C

2013-01-28T23:59:59.000Z

102

Data:Be04e7cf-c7f1-4d7e-8cee-d6ed1c98abb7 | Open Energy Information  

Open Energy Info (EERE)

Be04e7cf-c7f1-4d7e-8cee-d6ed1c98abb7 Be04e7cf-c7f1-4d7e-8cee-d6ed1c98abb7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maui Electric Co Ltd Effective date: 2012/05/04 End date if known: 2013/09/30 Rate name: Maui - TOU EV Residential Time-Of-Use Service with Electric Vehicle Pilot - Single Phase Sector: Residential Description: This Schedule is applicable to residential service customers who combine lighting, heating, cooking, air conditioning, and power in a single family dwelling unit, metered and billed separately, with charging of batteries of on-road electric vehicles. Source or reference: www.mauielectric.com

103

Data:A0c93ed9-cc82-4e5a-bb5a-0cb9a9be125f | Open Energy Information  

Open Energy Info (EERE)

c93ed9-cc82-4e5a-bb5a-0cb9a9be125f c93ed9-cc82-4e5a-bb5a-0cb9a9be125f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Elkhorn Rural Public Pwr Dist Effective date: 2013/01/01 End date if known: Rate name: RATE 33- Irrigation Pumping--Full Time Sector: Commercial Description: AVAILABLE: In the general area served by the District. APPLICABLE: To year-round irrigation service to customers who will contract for ten (10) horsepower or more and may be served from existing three phase distribution lines of 12,470 volts. Source or reference: http://www.erppd.com/Rate%20schedules/2012%20Rates/Irrigation%20Rates/SEDC33.pdf

104

Global demand transparency in the ABB supply chain  

E-Print Network (OSTI)

This paper attempts to provide a solution to a problem facing many multinational firms: the lack of an accessible and comprehensive database for up-to-date component part forecasts. We consider this problem in the context ...

Lee, Esther, S.M. Massachusetts Institute of Technology

2012-01-01T23:59:59.000Z

105

STATEMENT OF CONSIDERATIONS REQUEST BY ABB LUMMUS GLOBAL, INC...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

technology which will be adapted for use in the production of ethylene and other distillation applications. The work under LGI's subcontract is expected to take place over a...

106

SAGA Biennial Technical Meeting and Exhibition Short Paper Rapid Mesozoic thermal and chemical modification of the  

E-Print Network (OSTI)

, Wayne.Pettit@bhpbilliton.com 14. ABB Power Technologies ABB ­ HVDC, Sweden, jan.wasborg@se.abb.com 15

Jones, Alan G.

107

STATEMENT OF CONSIDERATIONS REQUEST BY ABB POWER T&D COMPANY...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

entitled, "Development and Demonstration of a 10MVA High Temperature Superconducting Transformer." The objective of this cooperative agreement is to design, build, test, install,...

108

COLE DOCTORALE ABB GREGOIRE QUIPE de LA CLINIQUE DE L'ACTIVIT  

E-Print Network (OSTI)

e milhas Antes de dormir Eu nem cochilei Os mais belos montes Escalei Nas noites escuras De frio m'ont aidée avec tant de patience à comprendre un peu de cette langue si difficile. � Antoine m'ont aidée, chacun à sa maniÚre, à comprendre un peu plus

Paris-Sud XI, Université de

109

WA_1995_035_ABB_POWER_GENERATION_INC_Waiver_of_Domestic_and_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home WA1995035ABBPOWERGENERATIONINCWaiverofDomesticand.pdf WA1995035ABBPOWERGENERATIONINCWaiv...

110

Generic Qualification of the ABB Common Qualified PLC Based Platform for Safety-Related Applications  

Science Conference Proceedings (OSTI)

As its nuclear plants age, the electric power industry is focusing on the development of cost-effective replacement systems for obsolete instrumentation, control, and safety systems. This report describes the generic qualification a platform for safety-related applications that incorporates programmable logic controllers (PLCs), a technology with an excellent track record in non-nuclear applications for critical control and safety functions.

1999-08-18T23:59:59.000Z

111

Confirmatory Survey for the Partial Site Release at the ABB Inc. CE Winsor Site, Windsor, CT  

Science Conference Proceedings (OSTI)

The objectives of the confirmatory surveys were to confirm that remedial actions had been effective in meeting established release criteria and that documentation accurately and adequately describes the final radiological conditions of the PSR Impacted Areas.

W.C. Adams

2008-06-27T23:59:59.000Z

112

Vehicle Technologies Office: Workplace Charging Challenge Partner...  

NLE Websites -- All DOE Office Websites (Extended Search)

Vehicle Technologies Office: Workplace Charging Challenge Partner: ABB Inc. on Google Bookmark Vehicle Technologies Office: Workplace Charging Challenge Partner: ABB Inc....

113

Data:A7697de4-626b-4ee9-84af-d89e77abbe73 | Open Energy Information  

Open Energy Info (EERE)

Clean Energy Analysis Low Emission Development Strategies Oil & Gas Smart Grid Solar U.S. OpenLabs Utilities Water Wind Page Actions View form View source History View...

114

Data:26a1cedc-cdd2-48ab-b4e7-e69401d1f3f9 | Open Energy Information  

Open Energy Info (EERE)

charge (a fixed minimum amount each month). Each category has its own minimum amount The energy usage charge (per kWh usage) The customer charge is a fixed rate that applies each...

115

Data:1410a315-6398-47ab-b0c0-af671c4e9022 | Open Energy Information  

Open Energy Info (EERE)

or reference: http:www.tub.netpdfelectricratesheetjuly12012-amh.pdf Assume net metering (buy sell): No Flat rate buy (kWh): 0.08566000 Flat rate sell (kWh):...

116

Bton cellulaire base d'co-liants , C. Lanos2  

E-Print Network (OSTI)

., Andres, Y., Abbe, J. Ch., Benmansour, M., 2001. Natural radioactivity in phosphates, phosphogypsum

Paris-Sud XI, Université de

117

CE IGCC Repowering plant sulfuric acid plant. Topical report, June 1993  

SciTech Connect

A goal of the CE IGCC Repowering project is to demonstrate a hot gas clean-up system (HGCU), for the removal of sulfur from the product gas stream exiting the gasifier island. Combustion Engineering, Inc. (ABB CE) intends to use a HGCU developed by General Electric Environmental Services (GEESI). The original design of this system called for the installation of the HGCU, with a conventional cold gas clean-up system included as a full-load operational back-up. Each of these systems removes sulfur compounds and converts them into an acid off-gas. This report deals with the investigation of equipment to treat this off-gas, recovering these sulfur compounds as elemental sulfur, sulfuric acid or some other form. ABB CE contracted ABB Lummus Crest Inc. (ABB LCI) to perform an engineering evaluation to compare several such process options. This study concluded that the installation of a sulfuric acid plant represented the best option from both a technical and economic point of view. Based on this evaluation, ABB CE specified that a sulfuric acid plant be installed to remove sulfur from off-gas exiling the gas clean-up system. ABB LCI prepared a request for quotation (RFQ) for the construction of a sulfuric acid production plant. Monsanto Enviro-Chem Inc. presented the only proposal, and was eventually selected as the EPC contractor for this system.

Chester, A.M.

1993-12-01T23:59:59.000Z

118

snox.p65  

NLE Websites -- All DOE Office Websites (Extended Search)

ABB ENVIRONMENTAL SYSTEMS SNOX ABB ENVIRONMENTAL SYSTEMS SNOX TM FLUE GAS CLEANING DEMONSTRATION PROJECT ABB ENVIRONMENTAL SYSTEMS PROJECT PERFORMANCE SUMMARY CLEAN COAL TECHNOLOGY DEMONSTRATION PROGRAM JUNE 1999 DOE/FE-0395 Disclaimer This report was prepared using publically available information, including the Final Technical Report and other reports prepared pursuant to a cooperative agreement partially funded by the U.S. Department of Energy. Neither the United States Government nor any agency, employee, contractor, or representative thereof, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe upon privately

119

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INEEL/EXT-04-02423 INEEL/EXT-04-02423 ABB SCADA/EMS System INEEL Baseline Summary Test Report J. R. Davidson M. R. Permann B. L. Rolston S. J. Schaeffer November 2004 Prepared by: Idaho National Engineering and Environmental Laboratory INEEL/EXT-04-02423 ABB SCADA/EMS System INEEL Baseline Summary Test Report J. R. Davidson M. R. Permann B. L. Rolston S. J. Schaeffer November 2004 Idaho National Engineering and Environmental Laboratory INEEL National Security Division Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Office of Energy Assurance Under DOE Idaho Operations Office Contract DE-AC07-99ID13727 ABB SCADA/EMS System INEEL Baseline Summary Test Report INEEL/EXT-04-02423 November 2004 ABSTRACT The Idaho National Engineering and Environmental Laboratory

120

Total cost model for making sourcing decisions  

E-Print Network (OSTI)

This thesis develops a total cost model based on the work done during a six month internship with ABB. In order to help ABB better focus on low cost country sourcing, a total cost model was developed for sourcing decisions. ...

Morita, Mark, M.B.A. Massachusetts Institute of Technology

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

NSTX PAC-29 Meeting Debriefing  

E-Print Network (OSTI)

=0->%*?@%*ABB CD*ABB)B*%!"#$%-4E40-FG%15H4EI.94E 7J0E4 09:%%incremental ; ? KLMIN%O=9%P44QER B; #-09EM

Princeton Plasma Physics Laboratory

122

Reducing inventory and order delivery time in an internal extended value chain  

E-Print Network (OSTI)

The extended value stream for the ABB Power Technologies Medium Voltage Business Area consists of numerous factories situated across various different countries. Most of these facilities were originally acquired by ABB to ...

Siefering, Brian W

2005-01-01T23:59:59.000Z

123

Area selection for diamonds using magnetotellurics: Examples from southern Africa Alan G. Jones a,  

E-Print Network (OSTI)

of the Witwatersrand, Jan Smuts Avenue, Johannesburg 2050, South Africa k ABB AB, HVDC, Ludvika, SE-77180, Sweden a b

Jones, Alan G.

124

SAGA Biennial Technical Meeting and Exhibition Short Paper Magnetotelluric imaging across a Neoproterozoic collision  

E-Print Network (OSTI)

and Industrial Research, Address, sfourie@csir.co.za 11. ABB AB, HVDC, Ludvika, SE-77180, Sweden; 12. Other

Jones, Alan G.

125

SAGA Biennial Technical Meeting and Exhibition Short Paper The SAMTEX experiment: Overview and Preliminary Results  

E-Print Network (OSTI)

Africa; 11: ABB AB, HVDC, Ludvika, SE-77180, Sweden; 12: Other members of the SAMTEX team include: Louise

Jones, Alan G.

126

Extended Abstract 1 International Kimberlite Conference Extended Abstract No. 9IKC-A-00387, 2008  

E-Print Network (OSTI)

, Johannesburg 2001, RSA; 11: ABB AB, HVDC, Ludvika, SE-77180, Sweden; 12: Other members of the SAMTEX team

Jones, Alan G.

127

Mitteilung fr die Medien Mitteilung fr die Medien Mitteilung fr die Medien Mitteilung fr die Medien Eine Zeile mit 39 Anschlage (mit Leerzeichen) durchschnittlich  

E-Print Network (OSTI)

;#12;#12;#12;#12;#12;#12;#12;#12;#12;#12;AGROLA setzt auf Erneuerbare Energie AGROLA folgt dem Weg der Sie mehr ĂŒber ABB und ihre Energie- und Automatisierungs-Technologien unter www.abb.ch © 2007 ABB #12 Erneuer- baren Energie aus Biomasse mit Ă?berzeugung und so ist die EinfĂŒhrung der beiden neuen

Schmidt, Matthias

128

Nationale Bildungskonferenz Elektromobilitt 2011  

E-Print Network (OSTI)

;#12;#12;#12;#12;#12;#12;#12;#12;#12;#12;AGROLA setzt auf Erneuerbare Energie AGROLA folgt dem Weg der Sie mehr ĂŒber ABB und ihre Energie- und Automatisierungs-Technologien unter www.abb.ch © 2007 ABB #12 Erneuer- baren Energie aus Biomasse mit Ă?berzeugung und so ist die EinfĂŒhrung der beiden neuen

Ulm, UniversitÀt

129

Mitteilung fr die Medien Mitteilung fr die Medien Mitteilung fr die Medien Mitteilung fr die Medien Eine Zeile mit 39 Anschlgen (mit Leerzeichen) durchschnittlich  

E-Print Network (OSTI)

;#12;#12;#12;#12;#12;#12;#12;#12;#12;#12;AGROLA setzt auf Erneuerbare Energie AGROLA folgt dem Weg der Sie mehr ĂŒber ABB und ihre Energie- und Automatisierungs-Technologien unter www.abb.ch © 2007 ABB #12 Erneuer- baren Energie aus Biomasse mit Ă?berzeugung und so ist die EinfĂŒhrung der beiden neuen

Schmidt, Matthias

130

Data:A0c7f897-db27-4a38-abb9-17b1c9d97ca4 | Open Energy Information  

Open Energy Info (EERE)

Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Hudson Gas & Elec Corp Effective date: 20120701 End date if known: Rate name: LF-MH 250 Watt...

131

ENVIRONMENTAL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

797 797 FINAL ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE FOR THE AGUA CALIENTE SOLAR PROJECT IN YUMA COUNTY, ARIZONA U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 November 2010 TABLE OF CONTENTS Section Page Executive Summary .................................................................................................................ES-1 Introduction ..........................................................................................................................ES-1 Purpose and Need ...............................................................................................................ES-1 Proposed Action and Alternatives........................................................................................ES-2

132

Microsoft Word - Utilities Form Consortium to Fund SCADA Testing_v3.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security ABB and Energy Utilities Form Consortium to Fund SCADA/EMS Cyber Security Assessment at National SCADA Test Bed Twelve utilities have formed a consortium with ABB, a supervisory control and data acquisition (SCADA) system vendor, to privately fund advanced research and testing through the U.S. Department of Energy's (DOE) National SCADA Test Bed (NSTB), announced a recent article in the journal Transmission & Distribution World. The utilities, located in the United States and Australia, will fund SCADA system assessments at NSTB testing facilities at Idaho National Laboratory. The consortium began taking shape last fall at an ABB User Group meeting, where ABB and some of its energy management system (EMS) customers asked other ABB system users to join in on

133

Value Capture in the Global Wind Energy Industry  

E-Print Network (OSTI)

converter Gamesa Spain Power transformer ABB SwitzerlandPower converter Power transformer Generator Main frame Pitchblades Gear box Power converter Transformer Generator Main

Dedrick, Jason; Kraemer, Kenneth L.

2011-01-01T23:59:59.000Z

134

STATEMENT OF CONSIDERATIONS REQUEST BY PHILLIPS PETROLEUM, INC...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

pursuing solutions to the regulatory impact of low sulfur fuels, such as ABB Lummus, Exxon, Halor Topsoe, Idemistsu Kosan, IFP, Kvaerner, Mobil- Akzo Nobel-Kellogg, Neste...

135

Fifth International Symposium on Superalloys 718, 625, 706, and ...  

Science Conference Proceedings (OSTI)

... stature and usage in land-based combustion turbines for generating electricity. ... ABB Power Generation, Switzerland; Shalesh J. Patel, INCO Special Metals; ...

136

David Dallinger  

NLE Websites -- All DOE Office Websites (Extended Search)

his dissertation and was subsequently employed at ABB (High Voltage) in Switzerland and China. He holds an MSc in Renewable Energies and Energy Efficiency from the University of...

137

Technology@TMS: Online Article - Materials Technology @ TMS  

Science Conference Proceedings (OSTI)

"A MITEI partnership with ABB creates enormous opportunities to provide technology solutions to global energy challenges," said MITEI Director Ernest J. Moniz.

138

SAGA Biennial Technical Meeting and Exhibition Short Paper Magnetotelluric study in northeastern Botswana  

E-Print Network (OSTI)

of the Witwatersrand, Jan Smuts Avenue, Johannesburg 2050, South Africa, WebbS@geosciences.wits.ac.za 11: ABB AB, HVDC

Jones, Alan G.

139

Microsoft PowerPoint - 3 Sophia.ppsx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INL networks with real-time remediation Performers: INL Partners: Idaho Falls Power, Austin Energy, ABB Summary Slide: Sophia Proof of Concept Consistent training materials on...

140

Session 4a Enjeti  

Science Conference Proceedings (OSTI)

... enjeti.tamu.edu Texas A&M University http://www.tamu.edu Medium voltage DVR - ABB Page 13. 14 Power Electronics ...

2012-07-27T23:59:59.000Z

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Presentations from the 2009 Workshop on Future Large CO2 ...  

Science Conference Proceedings (OSTI)

... Session 4.0. Richard Zhang, GE Oil and Gas; Kenneth Kullinger, ABB; Steve Moran, Converteam. Session 5.0. Ron Wolk, WITS. Session 6.0. ...

2013-06-25T23:59:59.000Z

142

Workshop on Comosities in Civil Applications  

Science Conference Proceedings (OSTI)

... 12:15 pm, Lunch. Afternoon Session: Offshore E&P Chair: Dr. Him Lo, Shell E&P Co-Chair: Karl Muriby, ABB Vetco Gray Inc. ...

2011-10-19T23:59:59.000Z

143

Log date 08_27_99_12:31:37 ============= Transaction ...  

Science Conference Proceedings (OSTI)

... head of ABB Robotics, Europe's largest producer, although he stress es, along with other robot industry executives, the potential of robots in t he ...

1999-10-22T23:59:59.000Z

144

High-megawatt Electric Drive Motors  

Science Conference Proceedings (OSTI)

... Page 2. © ABB BU Machines April 10, 2009 | Slide 2 High-megawatt Electric Drive Motors ... motor concept ... A selection of compressor motors >30MW. ...

2012-10-21T23:59:59.000Z

145

Newsletter, MArCH-April, 2011 IN THIS ISSUE  

E-Print Network (OSTI)

robot manipulators" Employment history Employed by ABB Power Transmission Pty. Ltd. (ASEA Pty. Ltd, Geelong Wool Combing, ADI Ltd. , Jaques, Multistack, Chubb Fire, Ringgrip, Stadt, RMIT Polymer Technology

146

milliken_cover.p65  

NLE Websites -- All DOE Office Websites (Extended Search)

systems designed to enhance plant efficiency and eliminate waste streams. The support systems assessed were ABB Air Preheater's heat pipe air preheater, a Corrosion and...

147

134th Annual Meeting & Exhibition  

Science Conference Proceedings (OSTI)

ABB's ElectroMagnetic Stirrers, AL-EMS, help you to be more cost effective and to achieve ... Substrate Holders with Rotation, RF Biasing, Heating and Cooling;.

148

CX-004313: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

system on existing rooftop of ABB plant. Includes necessary panels, wiring, inverter, and monitoring equipment. Includes data monitoring and transmission. DOCUMENT(S)...

149

NETL: Clean Coal Technology Demonstration Program (CCTDP) - Round 2  

NLE Websites -- All DOE Office Websites (Extended Search)

Combined SO2 / NOx Control Technologies Combined SO2 / NOx Control Technologies SNOX(tm) Flue Gas Cleaning Demonstration Project - Project Brief [PDF-359KB] ABB Environmental Systems, Niles, OH PROGRAM PUBLICATIONS Final Reports Final Report Volume II: Project Performance and Economics [PDF-10.2MB] (July 1996) CCT Reports: Project Performance Summaries, Post-Project Assessments, & Topical Reports ABB Environmental Systems SNOX(tm) Flue Gas Cleaning Demonstration Project, Project Performance Summary [PDF-450KB] (June 1999) SNOX(tm) Flue Gas Cleaning Demonstration Project: A DOE Assessment [PDF-185KB] (June 2000) Technologies for the Combined Control of Sulfur Dioxide and Nitrogen Oxides Emissions from Coal-Fired Boilers, Topical Report No. 13 [PDF-500KB] (May 1999) Design Reports Final Report Volume I: Public Design [PDF-3.9MB] (July 1996)

150

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 5630 of 28,905 results. 21 - 5630 of 28,905 results. Download ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) This document covers the security evaluation of the "baseline" or "as delivered" system performed in the Idaho National Engineering and Environmental Laboratory (INEEL) SCADA test bed as part of... http://energy.gov/oe/downloads/abb-scadaems-system-ineel-baseline-summary-test-report-november-2004 Download Preliminary Notice of Violation, CH2M Hill Hanford Group, Inc.- EA-2006-06 Preliminary Notice of Violation issued to CH2M Hill Hanford Group, Inc., related to Radiological Contamination Events at the Hanford Site Tank Farms http://energy.gov/hss/downloads/preliminary-notice-violation-ch2m-hill-hanford-group-inc-ea-2006-06 Download Technical Standards Newsletter- May 1996

151

Advanced Turbine System Program Phase 2 cycle selection  

DOE Green Energy (OSTI)

ABB`s GT24-ATS can meet or exceed the ATS program goals with minimal risk. It requires only minor modifications to the GT24 EV/SEV combustors to meet NOx goals, without steam cooling, variable geometry, or moving parts.

Latcovich, J.A. Jr.

1995-12-31T23:59:59.000Z

152

Adaptive Linear Prediction of Radiation Belt Electrons Using the Kalman Filter  

E-Print Network (OSTI)

development Employment of solar cells and modules for hydrogen gen- eration Analysis of pv. Movable sample table of the solar simulator developed by ISFH. Abb. 5: Ministerialrat Dr. Hans Schroeder and Nuclear Safety on the features of the solar simulator SUSI I. Abb. 7: BĂŒrgermeister Rolf Bremeyer bei der

153

Prediction of DC current return flow in northern Namibia Share et al. SAGA Biennial Technical Meeting and Exhibition Short Paper  

E-Print Network (OSTI)

. ABB Power Technologies AB - HVDC, Sweden, jan.wasborg@se.abb.com 12. Other members of the SAMTEX in the Otjiwarongo and Katima Mulilo regions, where in future the installation of high-voltage direct current (HVDC is needed for the optimal placement of HVDC earth electrodes in the future. An interesting challenge is now

Jones, Alan G.

154

BERLINER AUSBILDUNGSBETRIEBE METALL (eine Auswahl) Fertigung und Montage  

E-Print Network (OSTI)

GebÀudetechnik AG Region Ost Lessingstr. 79-81 13158 Berlin 91772415 http://www.abb.de ABB Kraftwerke Berlin Gmb Kunert Markendorfer Str. 6 13439 Berlin K.A.B. Kraftwerks- und Anlagenbau GmbH (metz. Gleistechnik Gottlieb-Dunkel-Str. 50-52 12099 Berlin 6251041 http://www.thyssenkrupp.de/ KST Kraftwerks- und

Berlin,Technische UniversitÀt

155

STATEMENT OF CONSIDERATIONS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ABB, Inc. for an Advance Waiver of Domestic and Foreign Invention Rights ABB, Inc. for an Advance Waiver of Domestic and Foreign Invention Rights under DOE Contract No. DE"()E000547, W(A) 2011"()33, CH·1620 The Petitioner, ABB, Inc. (ABB) was awarded the subject cooperative agreement with DOE for the performance of work entitled, "Smart Grid Research and Development and Demonstration." The goal of this project is to research, develop, and demonstrate a real-time electric utility distribution feeder performance monitoring, advisory control, and health management system for enhanced asset utilization and grid reliability. The waiver will apply to ABB employees and its subcontractor employees, except for inventions made by subcontractors eligible to retain title to inventions pursuant to P.L. 96-517, and National Laboratories.

156

ADVANCED TURBINE SYSTEM CONCEPTUAL DESIGN AND PRODUCT DEVELOPMENT - Final Report  

SciTech Connect

Asea Brown Boveri (ABB) has completed its technology based program. The results developed under Work Breakdown Structure (WBS) 8, concentrated on technology development and demonstration have been partially implemented in newer turbine designs. A significant improvement in heat rate and power output has been demonstrated. ABB will use the knowledge gained to further improve the efficiency of its Advanced Cycle System, which has been developed and introduced into the marked out side ABB's Advanced Turbine System (ATS) activities. The technology will lead to a power plant design that meets the ATS performance goals of over 60% plant efficiency, decreased electricity costs to consumers and lowest emissions.

Albrecht H. Mayer

2000-07-15T23:59:59.000Z

157

ADVANCED TURBINE SYSTEM CONCEPTUAL DESIGN AND PRODUCT DEVELOPMENT - Final Report  

SciTech Connect

Asea Brown Boveri (ABB) has completed its technology based program. The results developed under Work Breakdown Structure (WBS) 8, concentrated on technology development and demonstration have been partially implemented in newer turbine designs. A significant improvement in heat rate and power output has been demonstrated. ABB will use the knowledge gained to further improve the efficiency of its Advanced Cycle System, which has been developed and introduced into the marked out side ABB's Advanced Turbine System (ATS) activities. The technology will lead to a power plant design that meets the ATS performance goals of over 60% plant efficiency, decreased electricity costs to consumers and lowest emissions.

Albrecht H. Mayer

2000-07-15T23:59:59.000Z

158

NETL: Clean Coal Technology Demonstration Program (CCTDP) - Round...  

NLE Websites -- All DOE Office Websites (Extended Search)

Development of the Coal Quality Expert(tm) - Project Brief PDF-313KB ABB Combustion Engineering, Inc., and CQ, Inc. Pittsburgh, PA and Homer City, PA PROGRAM PUBLICATIONS Final...

159

Low-power flip-flop using internal clock gating and adaptive body bias.  

E-Print Network (OSTI)

??This dissertation presents a new systematic approach to flip-flop design using Internal Clock Gating, (ICG), and Adaptive Body-Bias, (ABB), in order to reduce power consumption.… (more)

Galvis, Jorge Alberto

2006-01-01T23:59:59.000Z

160

Sunday  

NLE Websites -- All DOE Office Websites (Extended Search)

Budget Submittal Calendar - ORPRL March Monday Tuesday Wednesday Thursday Friday 3 4 5 Footprint VTC 6 FY10 EM Guidance, 5 yr profile ABB Due to HQ 7 Final FY10 Cost Estimate...

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Electricity Storage for Intermittent Renewable Sources Jason Rugolo, Michael J. Aziz  

E-Print Network (OSTI)

for Si-materials, solar cells and modules Novel interconnection techniques for PV of the solar fair SOLTEC 2005 on the podium in the Weserbergland-Zentrum in Hamelin. Abb. 3: Siliciumwafer vor ..................................................................................................................................... 17 Bereich Solarthermie - Solar thermal division

162

2002 Exhibition: Commercial Mini-Sessions  

Science Conference Proceedings (OSTI)

Presented by: Olof Sjoden, ABB Inc, Metal Refining Systems .... High availability ( low maintenance; mould change within 30 min possible); High productivity (1 or 2 anodes per minute) ... Title: Management, Molten Metal and Protective Clothing

163

Real-Time Loop Scheduling with Energy Optimization Via DVS and ...  

Science Conference Proceedings (OSTI)

Real-Time Loop Scheduling with Energy. Optimization Via DVS and ABB for Multi -core. Embedded System. Guochen Hua1, Meng Wang1, Zili Shao1, Hui Liu2, ...

164

The enterprise architecting framework applied to the supply organization of a sourcing management center of excellence  

E-Print Network (OSTI)

The basis to develop this thesis was performed after executing an internship in ABB Inc. The main objective of the study was to design the organization to operate the procurement function at a new manufacturing campus.The ...

Villegas Kavanagh, Leon Felipe

2008-01-01T23:59:59.000Z

165

Amplitude [Sko94]. Amusement [Rud95b].  

E-Print Network (OSTI)

Version 0.05 Title word cross-reference 2 [Tro99c]. 3 [Ful96b, SB94a, SB94b]. n [Fre93a]. p [De 99]. ? [Abb05b].

Nelson H. F. Beebe; Adic [de -queens [frea

2013-01-01T23:59:59.000Z

166

2011 W. Meyer Qualifizierungsbedarf Smart Metering  

E-Print Network (OSTI)

1 2011 W. Meyer Qualifizierungsbedarf Smart Metering Qualifizierungsbedarf im Bereich Smart Metering Damit die Energiewende gelingt ­ Smart Metering und Smart Grid als Basis neuer, intelligenter, HEA, ZVEH, ZVEI (Pro Smart Metering Pressebilder), Hager, Siemens, Telekom, ABB, Dr. Neuhaus, Meterus

Ulm, UniversitÀt

167

Smart grid technologies and the development of a decision making framework for market entry  

E-Print Network (OSTI)

This thesis explores business opportunities in the "smart grid" environment for the Power Electronics Global Product Group (PE GPG) of ABB, Ltd. The goal of this thesis is three-fold: 1) Provide a detailed definition of ...

Lankton, Calman (Calman Ballow)

2010-01-01T23:59:59.000Z

168

Designing a supply chain for a foreign Greenfield facility  

E-Print Network (OSTI)

ABB Schweiz AG has experienced substantial growth in demand for the innovative energy management and conversion products designed and assembled by the Medium Voltage Automation Products Division. This demand has fully ...

Anstey, Brian (Brian Mark), II

2009-01-01T23:59:59.000Z

169

Improving customer order visibility to enable improved planning and decision making  

E-Print Network (OSTI)

The General Purpose Drives organization of ABB Switzerland does not capture sufficient data on the movement of customer orders through the production process to make efficient decisions on where to allocate improvement ...

Krause, Karla M. (Karla Margarete)

2011-01-01T23:59:59.000Z

170

Pushing the pulverized coal envelope with LEBS  

SciTech Connect

In response to challenges from technologies such as IGCC and PFBC, the ABB LEBS Team has proposed removing the barrier to very large advances in environmental and thermal performance of pulverized coal plants. Pulverized coal will continue to be the source of more than half of our electric generation well into the next century and we must develop low-risk low-cost advances that will compete with the claimed performance of other technologies. This paper describes near-term PC technologies for new and retrofit applications which will accomplish this.

Regan, J.W.; Borio, R.W.; Palkes, M. [and others

1995-12-31T23:59:59.000Z

171

CCT #13  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies for the Combined Control of Sulfur Dioxide Technologies for the Combined Control of Sulfur Dioxide and Nitrogen Oxides Emissions from Coal-Fired Boilers TOPICAL REPORT NUMBER 13 MAY 1999 TOPICAL REPORT NUMBER 13 A report on three projects conducted under separate cooperative agreements between: The U.S. Department of Energy and * ABB Environmental Systems * The Babcock & Wilcox Company * Public Service Company of Colorado MAY 1999 Technologies for the Combined Control of Sulfur Dioxide and Nitrogen Oxides Emissions from Coal-Fired Boilers 4 Technologies for the Combined Control of Sulfur Dioxide and Nitrogen Oxides Emissions from Coal-Fired Boilers Executive Summary ........................................................................................... 5 Background ........................................................................................................

172

Engineering development of advanced coal-fired low-emission boiler systems. Technical progress report No. 15, April 15 1996--June 1996  

SciTech Connect

The Pittsburgh Energy Technology center of the US Department of Energy (DOE) has contracted with Combustion Engineering; Inc. (ABB CE) to perform work on the {open_quotes}Engineering Development of Advanced Coal-Fired Low-Emission Boiler Systems{close_quote} Project and has authorized ABB CE to complete Phase I on a cost-reimbursable basis and Phases II and III on a cost-share basis.

1996-08-19T23:59:59.000Z

173

Environmental Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Video Community, Environment Environmental Stewardship Environmental Protection Environmental Management System Environmental Management System An Environmental...

174

WAIVERS BY PETITIONER Waivers By Petitioner Petitioner  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WAIVERS WAIVERS BY PETITIONER Waivers By Petitioner Petitioner 3M COMPANY 3M INNOVATIVE PROPE A. B. CHANCE COMPAN ABB AIR PREHEATER, I ABB COMBUSTION ENG ABB POWER GENERATI ABB POWER T&D COMP ABB-CE COMPANY ABENGOA BIOENERGY ACCELERATED DEPLO ACUREX CORP. Waiver Number W (A) 1975-001 W (A) 1975-001 W (C) 1999-008 W (C) 2001-001 W (C) 2002-002 W (A) 2000-012 W (A) 2004-038 W (A) 2003-002 W (1) 1978-029 W (A) 1993-024 W (A) 1995-045 W (A) 1995-035 W (A) 1998-016 W (A) 1991-024 W (A) 2005-003 W (C) 1998-003 W (A) 1980-114 W (A) 1980-115 Contact Numumber DE-SC02-99CH 10989 DE-AC05-00OR22725 DE-AC05-960R22464 DE-FC36-01AL67621 DE-FC02-02CH 11111 C-170 DE-FC36-95G01006 DE-AC04-76DP00789 DE-FC36-03GO13142 DE-FC02-80CS30264 DE-FC02-80CS30265 Waiver Status G G Gi G1 GI GI Gl GI WD G1 CL GI G1 GI P Gl G G Wednesday, February 02, 2005

175

Advancements in low NOx tangential firing systems  

Science Conference Proceedings (OSTI)

The most cost effective method of reducing nitrogen oxide emissions when burning fossil fuels, such as coal, is through in-furnace NOx reduction processes. ABB Combustion Engineering, Inc. (ABB CE), through its ABB Power Plant Laboratories has been involved in the development of such low NOx pulverized coal firing systems for many years. This development effort is most recently demonstrated through ABB CE`s involvement with the U.S. Department of Energy`s (DOE) {open_quotes}Engineering Development of Advanced Coal Fired Low-Emission Boiler Systems{close_quotes} (LEBS) project. The goal of the DOE LEBS project is to use {open_quotes}near term{close_quotes} technologies to produce a commercially viable, low emissions boiler. This paper addresses one of the key technologies within this project, the NOx control subsystem. The foundation for the work undertaken at ABB CE is the TFS 2000{trademark} firing system, which is currently offered on a commercial basis. This system encompasses sub-stoichiometric combustion in the main firing zone for reduced NOx formation. Potential enhancements to this firing system focus on optimizing the introduction of the air and fuel within the primary windbox to provide additional horizontal and vertical staging. As is the case with all in-furnace NOx control processes, it is necessary to operate the system in a manner which does not decrease NOx at the expense of reduced combustion efficiency.

Hein, R. von; Maney, C.; Borio, R. [and others

1996-12-31T23:59:59.000Z

176

Environmental Microbiology  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Microbiology Environmental Microbiology Environmental Microbiology Los Alamos working to identify genetic regulatory systems in single microorganisms. Get Expertise Cheryl Kuske DOE BER Biological System Science Division Program Manager Email Srinivas Iyer Bioscience Group Leader Email Rebecca McDonald Bioscience Communications Email Examining the soil beneath our feet Environmental microbiology Read caption + Many environmental molecular biology studies begin with purified DNA and RNA extracted from the soil. Overview of Research and Highlights Learning about microorganisms-bacteria, algae, and fungi-is essential to understanding how living things interact with their environments. Exploration of environmental microbiology at Los Alamos crosses broad scales of investigation that span from identification of genetic regulatory

177

ENVIRONMENTAL PERSPECTIVES  

E-Print Network (OSTI)

.S. Department of Health and Human Services Assessing the Ecotoxicologic Hazards of a Pandemic Influenza MedicalENVIRONMENTAL HEALTH PERSPECTIVES ENVIRONMENTAL HEALTH PERSPECTIVES National Institutes of Health U75012, France 4 Computational Epidemiology Laboratory, Institute for Scientific Interchange, Turin

Cattuto, Ciro

178

Environmental Impact  

U.S. Energy Information Administration (EIA)

Environmental Impact - a single comprehensive bibliographic information resource on climate change & other impacts of humans on the biosphere.

179

Engineering Feasibility of CO2 Capture on an Existing U.S. Coal-Fired Power Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

FEASIBILITY OF CO FEASIBILITY OF CO 2 CAPTURE ON AN EXISTING US COAL-FIRED POWER PLANT Nsakala ya Nsakala (nsakala.y.nsakala@power.alstom.com; 860-285-2018) John Marion (john.l.marion@power.alstom.com; 860-285-4539) Carl Bozzuto (carl.bozzuto@power.alstom.com; 860-285-5007) Gregory Liljedahl (greg.n.liljedahl@power.alstom.com; 860-285-4833) Mark Palkes (mark.palkes@power.alstom.com; 860-285-2676) ALSTOM Power Inc. US Power Plant Laboratories 2000 Day Hill Rd. Windsor, CT 06095 David Vogel (david.c.vogel@us.abb.com; 713-821-4312) J.C. Gupta (jcgupta@us.abb.com; 713-821-5093) ABB Lummus Global Inc. 3010 Briarpark Houston, TX 77042 Manoj Guha (mkguha@aep.com; 614-223-1285) American Electric Power 1 Riverside Plaza Columbus, OH 43215 Howard Johnson (hjohnson@odod.state.oh.us; 614-644-8368)

180

Microsoft Word - DWTS-Study Summary 10-19-05.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

DAKOTAS WIND TRANSMISSION STUDY DAKOTAS WIND TRANSMISSION STUDY STUDY SUMMARY TASK 1 THROUGH TASK 4 Prepared for: REPORT NO. 2005-10977-4 R1 October 3, 2005 (Revised October 19, 2005) Submitted by: ABB Inc., Electric Systems Consulting 940 Main Campus Drive, Suite 300 Raleigh, NC 27606 Dakotas Wind Transmission Study 2005-10977-4 R1 2 ABB Inc., Electric Systems Consulting Technical Report Dakotas Wind Transmission Study No. 2005-10977-4 R1 Title: DWTS Study Summary of Tasks 1 Through 4 Dept. ESC Date October 3, 2005 (Rev 10-19-05) Pages 9 Authors: Don Martin Reviewer: Ravi kanth Varanasi Summary: ABB Inc. was contracted to perform a Dakotas Wind Transmission Study for investigating transmission capacity for up to 500 MW of total new wind generation to be located at seven

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Magnetic Energy Storage System: Superconducting Magnet Energy Storage System with Direct Power Electronics Interface  

Science Conference Proceedings (OSTI)

GRIDS Project: ABB is developing an advanced energy storage system using superconducting magnets that could store significantly more energy than today’s best magnetic storage technologies at a fraction of the cost. This system could provide enough storage capacity to encourage more widespread use of renewable power like wind and solar. Superconducting magnetic energy storage systems have been in development for almost 3 decades; however, past devices were designed to supply power only for short durations—generally less than a few minutes. ABB’s system would deliver the stored energy at very low cost, making it ideal for eventual use in the electricity grid as a costeffective competitor to batteries and other energy storage technologies. The device could potentially cost even less, on a per kilowatt basis, than traditional lead-acid batteries.

None

2010-10-01T23:59:59.000Z

182

Environmental Microbiology  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Microbiology Environmental Microbiology Examining the soil beneath our feet Read caption + Many environmental molecular biology studies begin with purified DNA and RNA extracted from the soil. Overview of Research and Highlights Learning about microorganisms-bacteria, algae, and fungi-is essential to understanding how living things interact with their environments. Exploration of environmental microbiology at Los Alamos crosses broad scales of investigation that span from identification of genetic regulatory systems in single microorganisms to comprehensive studies of the complex microbial communities resident in soil, water and air. The long term goals of this research are to understand microbial processes and interactions, and the genomic traits underlying these activities, toward:

183

Environmental Effects  

Science Conference Proceedings (OSTI)

"The Environmental Durability of Refractory Metals and Alloys" (Conference .... " Materials Issues in Nuclear-Waste Management" (Overview), M.-S. Yim and K.L.  ...

184

Environmental Regulators  

NLE Websites -- All DOE Office Websites (Extended Search)

and Reports Brookhaven's Environmental Regulators When it comes to the environment, Brookhaven National Laboratory must comply with the regulations of many local, state and...

185

Environmental Outreach  

NLE Websites -- All DOE Office Websites (Extended Search)

and public involvement program that is inclusive and responsive to communities, tribes, agencies, and federal and state governments. May 30, 2012 An example of environmental...

186

Environmental management need environmental indicators  

Science Conference Proceedings (OSTI)

OECD countries are collectively the biggest users of natural resources in the world and the environmental, economic and social consequences of the production and consumption of these resources and of related economic activities extend far beyond their ... Keywords: environment, environmental indicator, management, sustainable development

Davorin Kralj; Anita Trnav?evi?

2009-02-01T23:59:59.000Z

187

ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Construction and Operation of a Proposed Biogas Anaerobic Digestion Facility at an Ethanol Plant Western Plains Energy, LLC Grinnell Township (Oakley), Gove County, Kansas U. S. Department of Agriculture Rural Business Cooperative Service 1400 Independence Avenue, SW Washington, DC 20250-3225 August 29, 2011 Environmental Assessment Western Plains Energy, LLC Gove County, Kansas ii TABLE OF CONTENTS Section Page I. PROPOSAL DESCRIPTION AND NEED .................................................................... 1 II. PRIMARY BENEFICIARIES AND RELATED ACTIVITIES .................................. 2 III. DESCRIPTION OF THE PROPOSAL AREA .............................................................. 2

188

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNIVERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 DOE/EA-1791 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNVIERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 U.S. Department of Energy University of Minnesota Wind Energy Research Consortium Project Golden Field Office Environmental Assessment March 2011 Page i Table of Contents 1.0 Introduction .......................................................................................................................................... 1

189

Environmental Intelligence  

NLE Websites -- All DOE Office Websites (Extended Search)

Intelligence Intelligence Answering big questions about environmental change begins with many small measurements (continued on next page) NEWSLETTER OF Oak Ridge National Laboratory's Energy and Environmental Sciences Directorate E nvironmental intelligence is the wealth of information on the physical, biological, and chemical processes that drive Earth's ecosystems (its organisms, soil, air, and water) and the impact humans have on these ecosystems through our practices and developments. Such intelligence is often gathered though small, precise efforts to monitor complex environmental processes with sensing and measurement systems. By collecting new or more detailed observational data from a greater number of locations across the globe, researchers can improve scientific

190

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee June 2011 U.S. Department of Energy Oak Ridge Office This page intentionally left blank. DOE/EA-1779 Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee Date Issued-June 2011 Bechtel Jacobs Company, LLC and CDM Federal Services Inc. contributed to the preparation of this document and may not be considered for review of the document U.S. Department of Energy Office of Environmental Management This page intentionally left blank. iii CONTENTS FIGURES......................................................................................................................................................

191

Environmental Sustainability  

NLE Websites -- All DOE Office Websites (Extended Search)

Environment » Environment » Environmental Stewardship » Environmental Sustainability /community-environment/_assets/images/icon_earthday.jpg Environmental Sustainability: Creating the Future Exercising our commitment to operating a sustainable site by creating a 50-year horizon of planning and preparing for effective environmental stewardship while executing national mission. Sustainability Goals» Recycling» Green Purchasing» Pollution Prevention» Reusing Water» Feature Stories» LOOK INTO LANL - highlights of our science, people, technologies close Novel cellulose structure requires fewer enzymes to process biomass to fuel Improved methods for breaking down cellulose nanofibers are central to cost-effective biofuel production. READ MORE An enzyme (shown in blue) pulls out individual cellulose chains (pink) from the pretreated nanofiber surface (green) and then breaks them apart into simple sugars. Image credit, Shishir Chundawat, Great Lakes Bioenergy Research Center.

192

Environmental quality  

SciTech Connect

Major emphasis is placed on man environment interactions and environment management. Topics include: ecology and living resources; the global environment; water and air quality; toxic substances and environmental health; energy; natural resources; NEPA regulations; and land use.

1980-12-01T23:59:59.000Z

193

Environmental decontamination  

SciTech Connect

The record of the proceedings of the workshop on environmental decontamination contains twenty-seven presentations. Emphasis is placed upon soil and surface decontamination, the decommissioning of nuclear facilities, and assessments of instrumentation and equipment used in decontamination. (DLS)

Cristy, G.A.; Jernigan, H.C. (eds.)

1981-02-01T23:59:59.000Z

194

Environmental Training  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Systems: the Cultural Change Game What's New in DOE O 450.1A? Implementing DOE Orders 450.1A and 430.2B Environmentally Preferable Purchasing: What is New in DOE...

195

Advance Waivers - 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Advance Waivers - 2005 The following Advance Waivers are available: WA 05 001 AIR PRODUCTS AND CHEMICALS Waiver of Patent Rights.pdf WA 05 002 DOW CORNING CORPORATION Waiver of domestic and for.pdf WA 05 004 ALSTOM ENVIRONMENTAL CONTROL SYSTEMS Waiver of Pat.pdf WA 05 005 HONEYWELL INC Waiver of Domestic and Foreign Inven.pdf WA 05 006 ABENGOA BIOENERGY CORPORATION Waiver of Domestic a.pdf WA 05 007 AIR PRODUCTS AND CHEMICALS INC Waiver of Domestic .pdf WA 05 008 GENERAL ELECTRIC COMPNAY Waiver of Domestic and fo.pdf WA 05 009 LUCENT TECHNOLOGIES INC Waiver of Patent Rights Un.pdf WA 05 010 ABB LUMMUS GLOBAL INC Waiver of domestic and Forei.pdf WA 05 011 UNITED TECHNOLOGIES CORPORATION Waiver of Domestic.pdf WA 05 012 CUMMINS WESTPORT INC Waiver of Domestic and Foreig.pdf

196

Engineering development of advanced coal-fired low-emission boiler systems. Quarterly technical progress report No. 17, October 1, 1996--December 31, 1996  

SciTech Connect

This report describes the work performed between October 1 and December 31, 1996 by the ABB team on U.S. Department of Energy project ``Engineering Development of Advanced Coal-Fired Low-Emission Boiler Systems`` (LEBS), which is part of the DOE`s Combustion 2000 Program. The overall objective of the LEBS Project is to dramatically improve environmental performance of future coal-fired power plants without adversely impacting efficiency or the cost of electricity. Near-term technologies, i.e., advanced technologies that are partially developed, will be used to reduce NO{sub x} and SO{sub 2} emission to one-sixth current NSPS limits and particulates to one- third current NSPS limits.

Regan, J.W.; Bender, D.J.; Clark, J.P.; Wesnor, J.D.

1997-01-01T23:59:59.000Z

197

Energy and Environmental Stewardship  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. Energy and Environmental Stewardship. The Division's environmental stewardship programs in ...

2013-07-29T23:59:59.000Z

198

Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

the Interior the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NV-S010-2013-0052-EA DOE/EA-1960 June 28, 2013 Townsite Solar Project Transmission Line PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Southern Nevada District Office Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, Nevada 702-515-5000 Office 702-515-5010 Fax Environmental Assessment for the Townsite Solar Project DOE/EA-1960 DOI-BLM-NV-S010-2013-0052 EA N-91290 Prepared For U.S. Department of the Interior

199

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 ENVIRONMENTAL ASSESSMENT FOR PROPOSED ENERGY CONSERVATION STANDARDS FOR RESIDENTIAL CLOTHES WASHERS December 2000 U.S. Department of Energy Assistant Secretary, Energy Efficiency & Renewable Energy Office of Building Research and Standards Washington, DC 20585 ENVIRONMENTAL ASSESSMENT FOR RESIDENTIAL CLOTHES WASHERS TABLE OF CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 2. PURPOSE AND NEED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 3. ALTERNATIVES INCLUDING THE PROPOSED ACTION . . . . . . . . . . . . . . . . . EA-2 3.1 No Action Alternative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.2 Proposed Standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.3 Alternative Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-3 3.4 Impacts of Proposed and Alternative Standards

200

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Interior the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NV-S010-2013-0052-EA DOE/EA-1960 June 28, 2013 Townsite Solar Project Transmission Line PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Southern Nevada District Office Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, Nevada 702-515-5000 Office 702-515-5010 Fax Environmental Assessment for the Townsite Solar Project DOE/EA-1960 DOI-BLM-NV-S010-2013-0052 EA N-91290 Prepared For U.S. Department of the Interior

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

682 682 Environmental Assessment Upgrades and Life Extension of the 242-A Evaporator, Hanford Site, Richland, Washington Conducted Under the American Recovery and Reinvestment Act of 2009 U.S. Department of Energy Richland, Washington Environmental Assessment February 20 10 DOE/EA- 1682 This page intentionally left blank. 1 February 20 10 DOE/EA- 1682 TABLE OF CONTENTS 1.0 INTRODUCTION..............................................................................1. 1.1 BACKGROUND ......................................................................... 3 1.2 PURPOSE AND NEED FOR THE PROPOSED ACTION ......................... 6 1.3 NEPA REQUIREMENTS............................................................... 6 2.0 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVE ....................... 8

202

ENVIRONMENTAL SCIENCE AND  

E-Print Network (OSTI)

ENVIRONMENTAL SCIENCE AND MANAGEMENT www.esr.pdx.edu Undergraduate Program: Environmental Science an emphasis on natural sciences and mathematics (Environmental Science) or emphasis on policy, geography and social sciences (Environmental Studies). Undergraduate Degrees Offered: Environmental Science Bachelor

203

Aligning National Environmental Policy Act Process with Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Aligning National Environmental Policy Act Process with Environmental Management Systems Aligning National Environmental Policy Act Process with Environmental Management Systems...

204

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 17, NO. 2, MAY 2002 283 Unbundled Reactive Support Service: Key  

E-Print Network (OSTI)

61801 USA (e-mail: gross@uiuc.edu). S. Tao is with ABB Energy Information Systems, Santa Clara, CA USA their implications in acquiring VAr support as one of the ancillary services. The paper provides an analysis markets by providing reactive support instead of real power. We illustrate the combined effects

Gross, George

205

A Congestion Management Aflocation Mechanism for Multiple Transaction Networks  

E-Print Network (OSTI)

. Author Affiliation: ABB Energy Information Systems; University of Illinois at Urbana at Champaign Number: PE-538PRS (02-2002) Discussion Deadline: July 2002 Gaming the Uniform-Price Spot Market: Quantitative Analysis Bialek, J.W Author Afflliation: University of Durham. Abstract: A range of indexes have

Gross, George

206

AOCS Official Method Ti 1a-64  

Science Conference Proceedings (OSTI)

Spectrophotometric Determination of Conjugated Dienoic Acid AOCS Official Method Ti 1a-64 Methods and Analyses Methods Downloads Methods Downloads Official Method BE2786ABB98768E1DCF0ACFD1AE2520C MC-TI1A64 16847

207

Acknowledgments  

Science Conference Proceedings (OSTI)

...Tim Webber, IPG Photonics, Oxford, MA Frank Brennan, Trumpf, Plymouth, MI Rainer Uhlig, ABB, Fort Collins, CO Jim Cann, Rofin Sinar, Plymouth, MI Urban Widén, Permanova, Mölndal, Sweden Robert Borgstrom, Precitec, New Hudson, MI Scott Green, LT Ultra, New Hudson, MI Mike...

208

Study on Bipole Protection of #x00B1;800KV UHVDC System  

Science Conference Proceedings (OSTI)

The main circuit of UHVDC transmission system in China is introduced. Based on the ABB HVDC control protection system, the principle and method of the interface technology between the PSCAD/EMTDC and HIDRAW are introduced. An off-line real-time simulation ... Keywords: UHVDC protection, PSCAD/EMTDC, HIDRAW, Bipole protection

Xiao-kang Xu; Ming-chao Xia

2010-06-01T23:59:59.000Z

209

Applications are invited for an Environment Canada Science Horizons Youth Internship to be held in the Department of Physics at the University of Toronto. The Intern will be employed as a research assistant to  

E-Print Network (OSTI)

transform spectrometer (FTS) manufactured by ABB Bomem of Quebec. Measurements of infrared solar absorption and maintenance of the TAO FTS, its sun- tracker, and associated hardware such as a vacuum pump, chiller, and data acquisition, software development, Fourier transform interferometry, absorption spectroscopy, and quantitative

Strong, Kimberly

210

Applications are invited for an Environment Canada Science Horizons Youth Internship to be held in the Department of Physics at the University of Toronto. The Intern will be employed as a research assistant to work on the project "Ongoing Air Quality  

E-Print Network (OSTI)

transform spectrometer (FTS) manufactured by ABB Bomem of Quebec. Measurements of infrared solar absorption and maintenance of the TAO FTS, its sun- tracker, and associated hardware such as a vacuum pump, chiller, and data development, Fourier transform interferometry, absorption spectroscopy, and quantitative analysis

Strong, Kimberly

211

STATE OF CALIFORNIA NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

Station #20 g Network- $15,000 183 Alternative Energy Sys Consulting, Inc. tems Three ABB/RWE DC Fast Enabled DC Fast Charging w Storage - 3450 Overland Avenue, Los A ith Energy ngeles $132,038 23 Smart Grid Enabled DC Fast Charging w Storage - 7858 Van Nuys Boulevard, Va ith Energy n Nuys $130,938 24 Smart Grid

212

Generative Models for Super-Resolution Single Molecule Microscopy Images of Biological Structures  

E-Print Network (OSTI)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 3.2 Conventional fluorescence image (A) and STORM reconstruction (B,C) of annular clathrin introduced by Ernst Abbe in 1873. Super-resolution (SR) imaging has led to various important studies the fluorescence of the molecules so that a subset of molecules are emitting at any given time and thus

213

Repowering the 250 MW Supercritical Power Plant at Lenenergo, Russia  

Science Conference Proceedings (OSTI)

This report describes the repowering of a supercritical 250 MW generating unit with an ABB 52.9 MN gas turbine at the Southern Plant of the Lenenergo system in Russia. It includes a review of the performance parameters of the repowered unit and an economic analysis of the repowering project.

1999-11-30T23:59:59.000Z

214

Botanischer Garten aktuell Was ist was? -Die Blten von Iris  

E-Print Network (OSTI)

Botanischer Garten aktuell Was ist was? - Die BlĂŒten von Iris Mit knapp 300 Arten gehört die Familie der Iridaceae (SchwertliliengewĂ€chse). Als Garten- pflanzen sind sie jedem bekannt; in der Natur Garten: Iris-Beet in der NĂ€he des Mittelmeerbeets, Teich, Wasserbecken etc. - Abb. aus PAX, F. (1888

Reggelin, Michael

215

Botanischer Garten Aktuell Echtes ,,Lebendgebren" bei Pflanzen  

E-Print Network (OSTI)

Botanischer Garten Aktuell Echtes ,,LebendgebÀren" bei Pflanzen: Sechium edule (JACQ.) SW. Chayote FruchthÀlfte entfernt; Embryo intakt Standort im Garten: Am Orchideenhaus; Abb. Aus Troll, W. (1973. ST. SCHNECKENBURGER, August 2012 © Text: Botanischer Garten TU Darmstadt (akt280) #12;

Reggelin, Michael

216

Simulation Environment for Development and Testing of Plug Compatible Power System Applications  

E-Print Network (OSTI)

by a number of suppliers including ABB, DSI, Incremental Systems, NSR, Siemens, Telegyr and Transdyn Controls, are introduced. The models in the EPRI OTS can be broadly divided into the following categories: Powerplant fossil, hydro, gas turbine, and nuclear units. Loads can be modeled using a combination of constant

217

Algorithmic [Bar06]. Algorithms [Mae94a, Mae96c]. Amplitude [Sko94]. Amusement [Rud95b]. Analysis  

E-Print Network (OSTI)

Version 0.06 Title word cross-reference 2 [Tro99c]. 3 [Ful96b, SB94a, SB94b]. n [Fre93a]. p [De 99]. ? [Abb05b].-adic [De 99].-Queens [Fre93a]. 1 [TiS96]. 1999 [Ker98].

Nelson H. F. Beebe

2013-01-01T23:59:59.000Z

218

WASTE TO WATTS Waste is a Resource!  

E-Print Network (OSTI)

WASTE TO WATTS Waste is a Resource! energy forum Case Studies from Estonia, Switzerland, Germany BREFs and their BATs Next Generation of Waste Fired Power Plants: Getting the most out of your trash Bossart,· ABB Waste-to-Energy Plants Edmund Fleck,· ESWET Marcel van Berlo,· Afval Energie Bedrijf From

Columbia University

219

Categorical Exclusion Determinations: Environmental Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management Categorical Exclusion Determinations: Environmental Management Categorical Exclusion Determinations issued by Environmental Management. DOCUMENTS AVAILABLE...

220

Environmental Policy and Assistance  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Protection, Sustainability Support & Corporate Safety Analysis HS-20 Home Mission & Functions » Office of Nuclear Safety, Quality Assurance & Environment » Sustainability Support » Environmental Policy & Assistance » Corporate Safety Programs » Analysis Program Contacts What's New? Sustainability Support Environment Corporate Safety Programs Analysis Environment Environmental Policy Environmental Guidance Environmental Reports Environmental Management System Radiation Protection Environmental Compliance Environmental Justice Environmental Training Environmental Tools Search Our Documents Topics & Resources Air Analytical Services Program CERCLA Cultural & Natural Resources DOE Comments on Rulemakings Federal Environmental Laws

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Environmental Sustainability Stories  

NLE Websites -- All DOE Office Websites (Extended Search)

Stories community-environmentassetsimagesiconearthday.jpg Environmental Stories Our environmental stewardship commitment: we will cleanup the past, minimize impacts for...

222

Obeying Environmental Laws  

NLE Websites -- All DOE Office Websites (Extended Search)

Environment Feature Stories Public Reading Room: Environmental Documents, Reports LANL Home Phonebook Calendar Video Community, Environment Environmental Stewardship ...

223

Environmental Management Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Management Systems Technical Assistance Tools Technical Assistance Tool: Integrating Sustainable Practices into Environmental Management Systems , November 2009...

224

M E Environmental Management Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

safety  performance  cleanup  closure safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management Office of Site Restoration, EM-10 Office of D&D and Facility Engineering, EM-13 Facility Deactivation & Decommissioning (D&D) D&D Program Map Addendum: Impact of American Recovery and Reinvestment Act (ARRA) on EM's D&D Program 2013 Edition U.S. Department Of Energy safety  performance  cleanup  closure M E Environmental Management Environmental Management safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management 3/13/2013 The American Recovery and Reinvestment Act of 2009

225

Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

ASSESSMENT (EA) ASSESSMENT (EA) FOR THE RECONSTRUCTION OF THE SOUTH ACCESS ROAD (CR 802) IN SUPPORT OF THE DEPARTMENT OF ENERGY, WASTE ISOLATION PILOT PLANT (WIPP) IN EDDY COUNTY, NEW MEXICO NEPA #: DOI-BLM-NM-P020-2010-0011-EA PREPARED IN COOPERATION WITH: DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE P. O. BOX 2078 CARLSBAD, NM 88221-2078 PREPARED BY: OWEN W. LOFTON SUPERVISORY MULTI RESOURCES SPECIALIST BUREAU OF LAND MANAGEMENT CARLSBAD FIELD OFFICE 620 EAST GREENE CARLSBAD, NM 88220 ENVIRONMENTAL ASSESSMENT BLM Office: Carlsbad Field Office DOI-BLM-NM-P020-2010-0011-EA Serial #: NM-123703 Department of Energy (DOE), Carlsbad Field Office (CBFO) Waste Isolation Pilot Plant (WIPP) South Access Road (SAR) 1.0 Purpose and Need for Action 1.1 The DOE CBFO, is requesting a right-of-way (ROW) that consists of re-

226

Environmental Protection Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Details Site Details EPD Home Staff List (pdf) Org Chart (pdf) Compliance / Permits Programs Other Information Land Use & Institutional Controls Mapping Site Environmental Reports Environmental Monitoring Plan (EMP) Spill Response BNL Site Index Can't View PDFs? Developing Environmental Products and Services for Brookhaven Stakeholders The Environmental Protection Division (EPD) develops and delivers environmental products and services for all Brookhaven stakeholders. We manage environmental programs such as pollution prevention, groundwater protection, and natural resource management; provide technical assistance on environmental requirements; maintain the Laboratory's IS0 14001-registered Environmental Management System; prepare environmental permit applications; conduct environmental monitoring; manage data

227

Environmental Management Education Program: Building Environmental Stewardship  

SciTech Connect

The BES program enhanced the capability to integrate environmental sustainability concepts and social justice into multi-dimensional curricula.

Chulock, Hilary N.

2004-01-14T23:59:59.000Z

228

Environmental Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Management System Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous improvement of our environmental performance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Managing our effects on the environment We are committed to protecting the environment while conducting our national security and energy-related missions. Laboratory Environmental Governing Policy What is the Environmental Management System? It covers every program in the Laboratory

229

Environmental Protection Division (ENV)  

National Nuclear Security Administration (NNSA)

in reducing environmental hazards, conserve environmental resources, minimize life-cycle costs and liability of DOE programs, and maximize operational capability through...

230

Environmental Management Commission (Alabama)  

Energy.gov (U.S. Department of Energy (DOE))

The Alabama Department of Environmental Management is charged with developing the state's environmental policy, hearing administrative appeals of permits, administrative orders and variances issued...

231

INSTRUMENTATION FOR ENVIRONMENTAL MONITORING  

E-Print Network (OSTI)

ENVIRONMENTAL MONITORING R. D. McLaughlin, M. S. Hunt, D. L.ENVIRONMENTAL MONITORING R. D. McLaughlin, M. S. Hunt, D. L.

McLaughlin, R.D.

2010-01-01T23:59:59.000Z

232

Environmental Biology | Biosciences Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Biology BIO Home Page About BIO News Releases Research Publications People Contact Us Organization Chart Site Index Inside BIO BIO Safety About Argonne Environmental...

233

Environmental Protection Implementation Plan  

SciTech Connect

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. The Environmental Protection Implementation Plan serves as an aid to management and staff to implement new environmental programs in a timely manner.

Brekke, D.D.

1994-01-01T23:59:59.000Z

234

Modelling environmental risk  

Science Conference Proceedings (OSTI)

As environmental issues have become increasingly important in economic research and policy for sustainable development, firms in the private sector have introduced environmental and social issues in conducting their business activities. Such behaviour ... Keywords: Asymmetry, Conditional volatility, Dow Jones Sustainability Indexes, Environmental risk, Environmental sustainability index, GARCH, GJR, Log-moment condition, Moment condition, Persistence, Shocks

Suhejla Hoti; Michael McAleer; Laurent L. Pauwels

2005-10-01T23:59:59.000Z

235

Argonne TDC: Environmental Technologies  

Emergency Response. Engineering. Environmental Research. Fuel Cells. Imaging Technology. Material Science. Nanotechnology. Physical Sciences. Sensor ...

236

Environmental Protection Implementation Plan  

SciTech Connect

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

Brekke, D.D.

1995-11-01T23:59:59.000Z

237

Environmental Survey preliminary report  

SciTech Connect

This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Sandia National Laboratories conducted August 17 through September 4, 1987. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with Sandia National Laboratories-Albuquerque (SNLA). The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at SNLA, and interviews with site personnel. 85 refs., 49 figs., 48 tabs.

Not Available

1988-04-01T23:59:59.000Z

238

ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF EM Recovery NEWS FLASH RECOVERY.GOV March 10, 2011 American Recovery and Reinvestment Act Payments Surge Past $4 Billion U.S. Depar tment of Energy | Office of Environmental Management For More Information on EM Recovery Act Work, Visit Us on the Web: http://www.em.doe.gov/emrecovery/ FINANCIAL HIGHLIGHTS * More than $4 BILLION in Recovery Act payments are accelerating environmental cleanup * 67% of EM Recovery Act funds have been paid Financial data are based on reporting as of March 9, 2011, and are subject to change. EM has made more than $4 billion in Recovery Act payments, or 32 percent of the DOE's $12.4 billion in Recovery Act payments. DOE received $35.2 billion

239

Environmental protection Implementation Plan  

SciTech Connect

This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

R. C. Holland

1999-12-01T23:59:59.000Z

240

Environmental Impact Statements and Environmental Assessments...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clean Energy Project, Ector, Texas August 3, 2011 EA-1840: Final Environmental Assessment California Valley Solar Ranch Project in San Luis Obispo and Kern Counties, California...

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Environmental Impact Statements and Environmental Assessments...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

an Environmental Impact Statement and to Conduct Scoping Meetings Hualapai Valley Solar Interconnection Project in Mohave County, Arizona July 30, 2009 EIS-0425: Notice of...

242

INEL Geothermal Environmental Program. Final environmental report  

DOE Green Energy (OSTI)

An overview of environmental monitoring programs and research during development of a moderate temperature geothermal resource in the Raft River Valley is presented. One of the major objectives was to develop programs for environmental assessment and protection that could serve as an example for similar types of development. The monitoring studies were designed to establish baseline conditions (predevelopment) of the physical, biological, and human environment. Potential changes were assessed and adverse environmental impacts minimized. No major environmental impacts resulted from development of the Raft River Geothermal Research Facility. The results of the physical, biological, and human environment monitoring programs are summarized.

Thurow, T.L.; Cahn, L.S.

1982-09-01T23:59:59.000Z

243

Environmental Impact Statements and Environmental Assessments...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17, 2010 EIS-0455: Notice of Adoption of an Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA December 17, 2010 EIS-0403: EPA Notice of...

244

Environmental Impact Statements and Environmental Assessments...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico...

245

THE CALIFORNIA ENVIRONMENTAL ENTERPRISE  

SciTech Connect

THE CALIFORNIA ENVIRONMENTAL ENTERPRISE (CEE) is a joint partnership of: the DOE Laboratories LLNL, LBL, and Sandia; the California Environmental Protection Agency (Cal/EPA); and the Institute of Environmental Solutions (IES). CEE is an independent, non-profit regional function organized and operated in accordance with the Department of Energy (DOE) ``Enterprise`` model developed by the DOE Environmental Management (EM) Strategic Task Force and the Strategic Laboratory Council. The vision of THE CALIFORNIA ENVIRONMENTAL ENTERPRISE is to create new economic opportunities through the advancement of rehabilitative reuse of environmentally impaired property, and through research, development and commercialization of alternative environmental technologies. The mission of THE CALIFORNIA ENVIRONMENTAL ENTERPRISE is to maximize the DOE investment by acting as the catalyst for the rapid development and acceptance of environmental technologies needed for redevelopment of contaminated sites, economic revitalization, and the dissipation of adversarial relationships between the public, regulators, problem-holders, and Federal agencies.

Ragaini, R.C. [Lawrence Livermore National Lab., CA (United States); Buckles, R.J. [Institute of Environmental Solutions, Sacarameto, CA (United States); Goldstein, N.E. [Lawrence Berkeley Lab., CA (United States); Bramlette, T.T. [Sandia National Labs., Livermore, CA (United States)

1994-04-01T23:59:59.000Z

246

Environmental Records.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TERMS TERMS ALARA as low as reasonably achievable CAA Clean Air Act CEQ Council on Environmental Quality CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CFR Code of Federal Regulations CX categorical exclusion DOE U.S. Department of Energy EA environmental assessment ECL environmental checklist EIS environmental impact statement EPA U.S. Environmental Protection Agency EPCRA Emergency Planning and Community Right-To-Know Act of 1986 FFA&CO Federal Facility Agreement & Consent Order FRC Federal Records Center HEPA high-efficiency particulate air IB information bulletin MSDS material safety data sheet NAAQS National Ambient Air Quality Standards Program NARA National Archives and Records Administration

247

Environmental protection implementation plan  

SciTech Connect

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

Holland, R.C.

1998-03-01T23:59:59.000Z

248

Environmental Implementation Plan  

SciTech Connect

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

1994-02-01T23:59:59.000Z

249

The Office of Environmental Management (EM) Defense Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(EM) Defense Environmental Cleanup The Office of Environmental Management (EM) Defense Environmental Cleanup Microsoft Word - 271C2C7B.doc More Documents & Publications Microsoft...

250

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

251

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

1993-03-15T23:59:59.000Z

252

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

1993-03-15T23:59:59.000Z

253

Environmental Impacts of Repository  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~~"'"""""""""'l.. _ _ 4 Environmental Impacts of Repository Construction, Operation and Monitoring, and Closure 4-iii Environmental Impacts of Repository Construction, Operations, Monitoring, and Closure TABLE OF CONTENTS Section Page 4. Environmental Impacts of Repository Construction, Operations, Monitoring, and Closure ..............4-1 4.1 Preclosure Environmental Impacts of Construction, Operations, Monitoring, and Closure of a Repository ...............................................................................................................................4-3 4.1.1 Impacts to Land Use and Ownership .......................................................................................4-4

254

Marine Environmental Specimen Bank  

Science Conference Proceedings (OSTI)

... National Status and Trends Program, the US Environmental Protection Agency's (EPA's) Mussel Watch Program, and the EXXON VALDEZ Damage ...

2013-07-23T23:59:59.000Z

255

Environmental Policy Statement  

Science Conference Proceedings (OSTI)

... Environmental Policy Statement. ... Ensuring that energy and water are used responsibly and conserved through innovative practices and procedures ...

2010-12-02T23:59:59.000Z

256

Environmental Risk Management  

Science Conference Proceedings (OSTI)

... Concerns about CO2 transmission ... A single CO 2 release has insignificant environmental impact ... may harm people and the environment ...

2012-10-24T23:59:59.000Z

257

Environmentally Assisted Cracking: Nuclear  

Science Conference Proceedings (OSTI)

About this Symposium. Meeting, Materials Science & Technology 2014. Symposium, Environmentally Assisted Cracking: Nuclear. Sponsorship. Organizer(s) ...

258

Because Environmental Stewardship  

NLE Websites -- All DOE Office Websites (Extended Search)

exceptional environmental per- formance and management. Minimize consumption (energy, water, non- renewable resources). Minimize the production of waste...

259

Environmental Management System Plan  

E-Print Network (OSTI)

Health, and Safety Division Environmental Services Group March 2009 Revision 4 Ernest Orlando Lawrence Berkeley National Laboratory

Fox, Robert

2009-01-01T23:59:59.000Z

260

Incorporating environmental justice into environmental decision making  

Science Conference Proceedings (OSTI)

Executive Order 12898, signed on February 11, 1994, broadly states that federal activities, programs, and policies should not produce disproportionately high and adverse impacts on minority and low-income populations. Moreover, the Order indicates that these populations should not be denied the benefits of, or excluded from participation in, these activities, programs, and policies. Because a presidential memorandum accompanying the order said that National Environmental Policy Act (NEPA) documents should begin to address environmental justice immediately, much attention has been paid to assessment-related issues. Also important, a topic that appears to have received relatively little attention, is how decision makers should be expected to use information about environmental justice in their decision making. This paper discusses issues surrounding the use of environmental justice information in the decision-making process by focusing on the following five main topics: (1) the importance, or weight, attached to environmental justice within larger decision-making contexts; (2) the potential tension between localized environmental justice issues and regional or national issues and needs; (3) the use of environmental justice information to develop (perhaps in concert with affected minority and low-income communities) appropriate mitigation strategies, or to establish conditions under which activities, programs, and policies may be accepted locally; (4) the general implications of shifting the distribution of broadly defined risks, costs, and benefits among different population groups; and (5) the implications of implementing environmental justice on an individual, ad hoc basis rather than within a larger environmental justice framework. This paper raises the issues and discusses the implications of alternative approaches to them.

Wolfe, A.K.; Vogt, D.P.; Hwang, Ho-Ling [Oak Ridge National Lab., TN (United States)] [and others

1995-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Environmental Public Health at  

E-Print Network (OSTI)

requiring special laboratory expertise · The Division of Emergency and Environmental Health Services, which, environmental sanitation, and laboratory sciences----to protect public health · Responding and sharing solutions to environmental public health problems worldwide "We" are---- · The Division of Laboratory Sciences, which

262

Environmental Management System Plan  

E-Print Network (OSTI)

offices, the EMS Program Program Elements Environmental ManagementOffice of Institutional Assurance as stated in the OQMP. 3-7 • Environmental ManagementEnvironmental Management System Fiscal Year Improve (EMP classification) Integrated Safety Management System International Organization for Standardization Lawrence Berkeley National Laboratory Office

Fox, Robert

2009-01-01T23:59:59.000Z

263

Environmental Impact Statements and Environmental Assessments...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 1996 EIS-0240: Final Environmental Impact Statement Disposition of Surplus Highly Enriched Uranium previous 1 2 3 4 5 6 7 8 next Energy.gov Careers & Internships...

264

1994 Site Environmental Report  

SciTech Connect

The 1994 Site Environmental Report summarizes environmental activities at Lawrence Berkeley Laboratory (LBL) for the calendar year (CY) 1994. The report strives to present environmental data in a manner that characterizes the performance and compliance status of the Laboratory`s environmental management programs when measured against regulatory standards and DOE requirements. The report also discusses significant highlight and planning efforts of these programs. The format and content of the report are consistent with the requirements of the US Department of Energy (DOE) Order 5400.1, General Environmental Protection Program.

NONE

1995-05-01T23:59:59.000Z

265

Environmental Report 2008  

Science Conference Proceedings (OSTI)

The purposes of the Lawrence Livermore National Laboratory Environmental Report 2008 are to record Lawrence Livermore National Laboratory's (LLNL's) compliance with environmental standards and requirements, describe LLNL's environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites - the Livermore site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL's Environmental Protection Department. Submittal of the report satisfies requirements under DOE Order 231.1A, Environmental Safety and Health Reporting, and DOE Order 5400.5, Radiation Protection of the Public and Environment. The report is distributed electronically and is available at https://saer.lln.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning in 1994 are also on the website. Some references in the electronic report text are underlined, which indicates that they are clickable links. Clicking on one of these links will open the related document, data workbook, or website that it refers to. The report begins with an executive summary, which provides the purpose of the report and an overview of LLNL's compliance and monitoring results. The first three chapters provide background information: Chapter 1 is an overview of the location, meteorology, and hydrogeology of the two LLNL sites; Chapter 2 is a summary of LLNL's compliance with environmental regulations; and Chapter 3 is a description of LLNL's environmental programs with an emphasis on the Environmental Management System including pollution prevention. The majority of the report covers LLNL's environmental monitoring programs and monitoring data for 2008: effluent and ambient air (Chapter 4); waters, including wastewater, storm water runoff, surface water, rain, and groundwater (Chapter 5); and terrestrial, including soil, sediment, vegetation, foodstuff, ambient radiation, and special status wildlife and plants (Chapter 6). Complete monitoring data, which are summarized in the body of the report, are provided in Appendix A. The remaining three chapters discuss the radiological impact on the public from LLNL operations (Chapter 7), LLNL's groundwater remediation program (Chapter 8), and quality assurance for the environmental monitoring programs (Chapter 9). The report uses Systeme International units, consistent with the federal Metric Conversion Act of 1975 and Executive Order 12770, Metric Usage in Federal Government Programs (1991). For ease of comparison to environmental reports issued prior to 1991, dose values and many radiological measurements are given in both metric and U.S. customary units. A conversion table is provided in the glossary. The report is the responsibility of LLNL's Environmental Protection Department. Monitoring data were obtained through the combined efforts of the Environmental Protection Department; Environmental Restoration Department; Physical and Life Sciences Environmental Monitoring Radiation Laboratory; and the Hazards Control Department.

Gallegos, G; Bertoldo, N A; Campbell, C G; Cerruti, S; Dibley, V; Doman, J L; Grayson, A R; Jones, H E; Kumamoto, G; MacQueen, D H; Nelson, J C; Paterson, L; Revelli, M A; Wegrecki, A M; Wilson, K; Woollett, J

2009-09-16T23:59:59.000Z

266

Development of a Coal Quality Expert  

SciTech Connect

ABB Power Plant Laboratories Combustion Engineering, Inc., (ABB CE) and CQ Inc. completed a broad, comprehensive program to demonstrate the economic and environmental benefits of using higher quality U.S. coals for electrical power generation and developed state-of-the-art user-friendly software--Coal Quality Expert (CQE)-to reliably predict/estimate these benefits in a consistent manner. The program was an essential extension and integration of R and D projects performed in the past under U.S. DOE and EPRI sponsorship and it expanded the available database of coal quality and power plant performance information. This software will permit utilities to purchase the lowest cost clean coals tailored to their specific requirements. Based on common interest and mutual benefit, the subject program was cosponsored by the U.S. DOE, EPRI, and eight U.S. coal-burning utilities. In addition to cosponsoring this program, EPN contributed its background research, data, and computer models, and managed some other supporting contracts under the terms of a project agreement established between CQ Inc. and EPRI. The essential work of the proposed project was performed under separate contracts to CQ Inc. by Electric Power Technologies (El?'T), Black and Veatch (B and V), ABB Combustion Engineering, Babcock and Wilcox (B and W), and Decision Focus, Inc. Although a significant quantity of the coals tied in the United States are now cleaned to some degree before firing, for many of these coals the residual sulfur content requires users to install expensive sulfur removal systems and the residual ash causes boilers to operate inefficiently and to require frequent maintenance. Disposal of the large quantities of slag and ash at utility plant sites can also be problematic and expensive. Improved and advanced coal cleaning processes can reduce the sulfur content of many coals to levels conforming to environmental standards without requiring post-combustion desulfurization systems. Also, some coals may be beneficiated or blended to a quality level where significantly less costly desulfurization systems are needed. Coal cleaning processes may also be used to remove the precursors of other troublesome emissions that can be identified now or in the future. An added benefit of coal cleaning and blending is the reduction in concentrations of mineral impurities in the fuel leading to improved performance and operation of the'' boiler in which it is fired. The ash removed during the pre-combustion cleaning process can be more easily and safely disposed of at the mine than at the utility plant after combustion. EPRI's Coal Quality Impact Model (CQIM) has shown that improved fuel quality can result in savings in unit capital and operating costs. This project produced new and improved software to select coal types and specifications resulting in the best quality and lowest cost fuel to meet specific environmental requirements.

None

1998-06-20T23:59:59.000Z

267

Environmental Compliance Management System  

SciTech Connect

Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy.

Brownson, L.W.; Krsul, T.; Peralta, R.A. [Argonne National Lab., Idaho Falls, ID (United States); Knudson, D.A.; Rosignolo, C.L. [Argonne National Lab., IL (United States)

1992-09-01T23:59:59.000Z

268

Environmental Compliance Management System  

SciTech Connect

Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy.

Brownson, L.W.; Krsul, T.; Peralta, R.A. (Argonne National Lab., Idaho Falls, ID (United States)); Knudson, D.A.; Rosignolo, C.L. (Argonne National Lab., IL (United States))

1992-01-01T23:59:59.000Z

269

RM Environmental Review (NEPA)  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Review-NEPA Environmental Review-NEPA Categorical exclusions are posted here to promote transparency and openness. Some actions may have environmental impacts that require an environmental assessment and a detailed analysis to determine the extent and severity of the impacts. For actions that have significant impacts or consequences to the environment or human health, RM prepares environmental impact statements. Environmental Impact Statements-EIS Estes-Flatiron Transmission Line Rebuild Project Granby Pumping Plant-Windy Gap Transmission Line Rebuild Project Hermosa West Wind Energy Project Maintenance and Vegetation Management along Existing Western TransmissionLine Rights of Way on National Forest System Lands in Colorado, Utah, Nebraska Platte River Cooperative Agreement PEIS, NE, CO and WY, DOE/EIS-0295 (Cooperating Agency)

270

UGP Environmental Review (NEPA)  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Review-NEPA Environmental Review-NEPA Categorical exclusions are posted here to promote transparency and openness. Some actions may have environmental impacts that require an environmental assessment and a detailed analysis to determine the extent and severity of the impacts. For actions that have significant impacts or consequences to the environment or human health, UGP prepares environmental impact statements. Environmental Impact Statement-EIS Groton Generation Projects Draft EIS, Deer Creek Station Energy Facility Project, Brookings County, South Dakota (12.7mb pdf) Deer Creek Station Energy Facility Project Record of Decision (900kb pdf) Grande Praire Wind Farm, O'Neill, NE Wilton IV Wind Energy Center EIS (DOE/EIS-0469) Upper Great Plains Wind Energy Programmatic EIS (DOE/EIS-0408)

271

Earth & Environmental Science  

NLE Websites -- All DOE Office Websites (Extended Search)

Earth & Environmental Science Earth & Environmental Science Earth & Environmental Science1354608000000Earth & Environmental ScienceSome of these resources are LANL-only and will require Remote Access./No/Questions? 667-5809library@lanl.gov Earth & Environmental Science Some of these resources are LANL-only and will require Remote Access. Key Resources Reference Data Sources Organizations Journals Key Resources AGRICOLA The catalog and index to the collections of the National Agricultural Library, as well as a primary public source for world-wide access to agricultural information. BioOne A global, not-for-profit collaboration bringing together scientific societies, publishers, and libraries to provide access to critical, peer-reviewed research in the biological, ecological, and environmental

272

Site environmental report summary  

Science Conference Proceedings (OSTI)

In this summary of the Fernald 1992 Site Environmental Report the authors will describe the impact of the Fernald site on man and the environment and provide results from the ongoing Environmental Monitoring Program. Also included is a summary of the data obtained from sampling conducted to determine if the site complies with DOE, US Environmental Protection Agency (USEPA), and Ohio EPA (OEPA) requirements. These requirements are set to protect both man and the environment.

Not Available

1992-12-31T23:59:59.000Z

273

Environmental renaissance in Pennsylvania  

Science Conference Proceedings (OSTI)

During centuries of rapid growth of the coal mining industry and expanded development in Pennsylvania, trees were felled, streams were diverted and strip mining caused much environmental damage. All that has now changed. The article gives examples of land and water restoration carried out by organizations such as the Susquehanna River Basin Commission, the West Branch Susquehanna Restoration Coalition and the Anthracite Region Independent Power Producers Association. The Pennsylvania Department of Environmental Protection directs and coordinates environmental projects. 5 photos.

Stevens, J.

2009-07-15T23:59:59.000Z

274

PIEDMONT ENVIRONMENTAL COUNCIL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PIEDMONT ENVIRONMENTAL COUNCIL PIEDMONT ENVIRONMENTAL COUNCIL October 30, 2013 Julie A. Smith and Christopher Lawrence Office of Electricity Delivery and Energy Reliability Mail Code: OE-20 U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 VIA electronic mail: juliea.smith@hq.doe.gov christopher.lawrence@hq.doe.gov Dear Ms. Smith and Mr. Lawrence: The Piedmont Environmental Council (PEC) was founded in 1972 to promote and protect the Virginia

275

Site Environmental Report, 1993  

SciTech Connect

The Site Environmental Report (SER) is prepared annually in accordance with DOE Order 5400.1, ``General Environmental Protection Program.`` This 1993 SER provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA (OEPA). For some readers, the highlights provided in the Executive Summary may provide sufficient information. Many readers, however, may wish to read more detailed descriptions of the information than those which are presented here.

Not Available

1994-06-01T23:59:59.000Z

276

Environmental information management plan  

Science Conference Proceedings (OSTI)

The Environmental Information Management Plan provides an overview of the management of environmental information generation by Hanford Site programs. The long-term nature of environmental programs requires that electronic data, documents, and other materials be kept for extended periods in a secure, controlled, and retrievable manner. An important part of the program is the maintenance of administrative records under the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989). The Environmental Information Management Plan introduces Westinghouse Hanford records management and engineering document control systems and their relationship to environmental programs. Specific information is provided about the operation of the Environmental Data Management Center, a central facility that receives, processes, and maintains information related to environmental program activities. The Environmental Data Management Center maintains a reference file, coordinates administrative record activities, and distributes administrative record indexes and administrative record documents to the US Environmental Protection Agency, the US Department of Energy, the Washington State Department of Ecology, and four information repositories. 43 refs., 16 figs., 5 tabs.

Michael, L.E.; Main, G.C.; See, E.J.

1990-03-01T23:59:59.000Z

277

1987 environmental monitoring report  

Science Conference Proceedings (OSTI)

The primary purpose of Brookhaven National Laboratory's (BNL) environmental monitoring program is to determine whether: facility operations, waste treatment, and control systems functioned as designed to contain environmental pollutants; and the applicable environmental standards and effluents control requirements were met. This annual report for calendar year 1987 follows the recommendations given by the Department of Energy (DOE) but has been broadened to meet site-specific environmental monitoring needs. This program includes the sampling and analysis for radioactivity, water quality indices, metals, and organic compounds. 32 refs., 17 figs., 70 tabs.

Miltenberger, R.P.; Royce, B.A.; Naidu, J.R. (eds.)

1988-04-01T23:59:59.000Z

278

DUF6 Environmental Risks  

NLE Websites -- All DOE Office Websites (Extended Search)

Risks A discussion of the potential environmental impacts associated with depleted uranium handling or processing facilities. Impacts Considered in the PEIS Depleted uranium...

279

Environmental Compliance Guide  

SciTech Connect

Volume II supplements Vol. I in providing procedures, relative timing, and details to assist in achieving compliance with Federal environmental requirements. (PSB)

None

1981-02-01T23:59:59.000Z

280

Center for Environmental Biotechnology  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Program, the Energy Resources Program, and the Climate Change and Carbon Management Program. The Center for Environmental Biotechnology, houses all of the Ecology...

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Environmental Quality: Air (Louisiana)  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Environmental Quality regulates air quality in Louisiana. The Department has an established a fee system for funding the monitoring, investigation and other activities required...

282

Environmental Degradation Meeting 2005  

Science Conference Proceedings (OSTI)

Environmentally induced materials problems cause a significant portion of nuclear power plant outage time and are of great economic and safety concern both ...

283

INSTRUMENTATION FOR ENVIRONMENTAL MONITORING  

E-Print Network (OSTI)

MO, June 4-7, 1979 INSTRUMENTATION FOR ENVIRONMENTALContract W-7405-ENG-48 INSTRUMENTATION FOR ENVIRONMENTAL0.003 mrem C^ Figure 5 INSTRUMENTATION: Too often analytical

McLaughlin, R.D.

2010-01-01T23:59:59.000Z

284

1999 Site Environmental Report  

SciTech Connect

The Site Environmental Report for Brookhaven National Laboratory for the calendar year 1999, as required by DOE Order 231.1.

NONE

2000-09-01T23:59:59.000Z

285

SRS Environmental Report 2001  

NLE Websites -- All DOE Office Websites (Extended Search)

free Adobe Acrobat Reader. To download this software from Adobe, please CLICK HERE. DOE Logo DOE-EM logo Savannah River Site Environmental Report for 2001 (PDFs) Savannah...

286

Special Environmental Analysis  

National Nuclear Security Administration (NNSA)

April 14, 2003 iv ACRONYMS BMPs best management practices BRMP Biological Resources Management Plan DOE U.S. Department of Energy EA environmental assessment SEA Mitigation...

287

EML: Environmental Measurements Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Security and Privacy Notices History of the Environmental Measurements Laboratory The Manhattan ProjectAtomic Energy Commission (1942 1975) Our Laboratory traces its roots...

288

E M Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

E M Environmental Management safety performance cleanup closure EM RECOVERY ACT TOP LINE MESSAGES * The Department estimates the 6 billion Recovery Act investment has allowed us...

289

Environmental report 1993  

Science Conference Proceedings (OSTI)

Lawrence Livermore National Laboratory (LLNL), a US Department of Energy (DOE) facility operated by the University of California, serves as a national resource of scientific, technical, and engineering capability with a special focus on national security. Over the years, the Laboratory`s mission has been broadened to encompass such areas as strategic defense, energy, the environment, biomedicine, the economy, and education. The Laboratory carries out this mission in compliance with local, state, and federal environmental regulatory requirements and takes measures to ensure that its operations do not adversely affect the environment or public health. It does so with the support of the Environmental Protection Department, which is responsible for environmental monitoring, environmental restoration, hazardous waste management, and ensuring environmental compliance. During 1993, the Environmental Protection Department conducted sampling of air, sewage effluent, ground water, surface water, soil, vegetation and foodstuffs, and took measurements of environmental radiation. It performed more than 190,000 analyses of environmental samples. The analytical results are summarized along with evaluations of the impact of radioactive and nonradioactive materials, a discussion of the effects of LLNL operations on the environment, and a summary of the activities undertaken to comply with local, state, and federal environmental laws.

Wilt, G.C. [ed.; Gallegos, G.M.; Tate, P.J.; Balke, B.K. [and others

1994-09-01T23:59:59.000Z

290

2001 SITE ENVIRONMENTAL REPORT  

Science Conference Proceedings (OSTI)

THE SITE ENVIRONMENTAL REPORT FOR BROOKHAVEN NATIONAL LABORATORY FOR THE CALENDAR YEAR 2001, AS REQUIRED BY DOE ORDER 231.1.

BROOKHAVEN NATIONAL LABORATORY

2002-09-01T23:59:59.000Z

291

DOE Plutonium Disposition Study: Pu consumption in ALWRs. Volume 1, Final report  

SciTech Connect

The Department of Energy (DOE) has contracted with Asea Brown Boveri-Combustion Engineering (ABB-CE) to provide information on the capability of ABB-CE`s System 80 + Advanced Light Water Reactor (ALWR) to transform, through reactor burnup, 100 metric tonnes (MT) of weapons grade plutonium (Pu) into a form which is not readily useable in weapons. This information is being developed as part of DOE`s Plutonium Disposition Study, initiated by DOE in response to Congressional action. This document, Volume 1, presents a technical description of the various elements of the System 80 + Standard Plant Design upon which the Plutonium Disposition Study was based. The System 80 + Standard Design is fully developed and directly suited to meeting the mission objectives for plutonium disposal. The bass U0{sub 2} plant design is discussed here.

Not Available

1993-05-15T23:59:59.000Z

292

Engineering development of advanced coal-fired low-emission boiler system. Technical progress report No. 1, August--December 1992  

Science Conference Proceedings (OSTI)

The Pittsburgh Energy Technology Center of the US Department of Energy (DOE) has contracted with Combustion Engineering, Inc. (ABB CE) to perform work on the ``Engineering Development of Advanced Coal-Fired Low-Emission Boiler Systems`` Project and has authorized ABB CE to complete Phase I on a cost-reimbursable basis. The overall objective of the Project is the expedited commercialization of advanced coal-fired low-emission boiler systems. The specified primary objectives are: NO{sub x} emissions not greater than one-third NSPS; SO{sub x} emissions not greater than one-third NSPS; and particulate emissions not greater than one-half NSPS. The specific secondary objectives are: Improved ash disposability and reduced waste generation; reduced air toxics emissions; increased generating efficiency. The final deliverables are a design data base that will allow future coal-fired power plants to meet the stated objectives and a preliminary design of a commercial generation unit.

Not Available

1993-02-26T23:59:59.000Z

293

Engineering development of advanced coal-fired low-emission boiler system  

Science Conference Proceedings (OSTI)

The Pittsburgh Energy Technology Center of the US Department of Energy (DOE) has contracted with Combustion Engineering, Inc. (ABB CE) to perform work on the Engineering Development of Advanced Coal-Fired Low-Emission Boiler Systems'' Project and has authorized ABB CE to complete Phase I on a cost-reimbursable basis. The overall objective of the Project is the expedited commercialization of advanced coal-fired low-emission boiler systems. The specified primary objectives are: NO[sub x] emissions not greater than one-third NSPS; SO[sub x] emissions not greater than one-third NSPS; and particulate emissions not greater than one-half NSPS. The specific secondary objectives are: Improved ash disposability and reduced waste generation; reduced air toxics emissions; increased generating efficiency. The final deliverables are a design data base that will allow future coal-fired power plants to meet the stated objectives and a preliminary design of a commercial generation unit.

Not Available

1993-02-26T23:59:59.000Z

294

Screening study for evaluation of the potential for system 80+ to consume excess plutonium - Volume 2. Final report  

Science Conference Proceedings (OSTI)

As part of the U.S. effort to evaluate technologies offering solutions for the safe disposal or utilization of surplus nuclear materials, the fiscal year 1993 Energy and Water Appropriations legislation provided the Department of Energy (DOE) the necessary funds to conduct multi-phased studies to determine the technical feasibility of using reactor technologies for the triple mission of burning weapons grade plutonium, producing tritium for the existing smaller weapons stockpile, and generating commercial electricity. DOE limited the studies to five advanced reactor designs. Among the technologies selected is the ABB-Combustion Engineering (ABB-CE) System 80+. The DOE study, currently in Phase ID, is proceeding with a more detailed evaluation of the design`s capability for plutonium disposition.

Not Available

1994-04-30T23:59:59.000Z

295

Environmental Monitoring Plan  

SciTech Connect

The purpose of the environmental monitoring plan (EMP) is to promote the early identification of, and response to, potential adverse environmental impacts associated with DOE operations. Environmental monitoring supports the Integrated Safety Management System (ISMS) to detect, characterize, and respond to releases from DOE activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of the DOE activity. In addition, the EMP addresses the analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of radionuclide samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. Until recently, environmental monitoring at Lawrence Livermore National Laboratory (LLNL) was required by DOE Order 5400.1, which was canceled in January 2003. LLNL is in the process of adopting the ISO 14001 Environmental Management Systems standard, which contains requirements to perform and document environmental monitoring. The ISO 14001 standard is not as prescriptive as DOE Order 5400.1, which expressly required an EMP. LLNL will continue to prepare the EMP because it provides an organizational framework for ensuring that the work is conducted appropriately. The environmental monitoring addressed by the plan includes preoperational characterization and assessment, and effluent and surveillance monitoring. Additional environmental monitoring is conducted at LLNL as part of the compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). This EMP does not address the technical requirements for such monitoring.

Althouse, P E; Bertoldo, N A; Bowen, B M; Brown, R A; Campbell, C G; Christofferson, E; Gallegos, G M; Grayson, A R; Jones, H E; Larson, J M; Laycak, D; Mathews, S; Peterson, S R; Revelli, M J; Rueppel, D; Williams, R A; Wilson, K; Woods, N

2005-11-23T23:59:59.000Z

296

Comprehensive Environmental Management Process  

SciTech Connect

This report contains information about Los Alamos National Laboratory`s Comprehensive Environmental Management Plan. The topics covered include: waste minimization, waste generation, environmental concerns, public relations of the laboratory, and how this plan will help to answer to the demands of the laboratory as their mission changes.

Hjeresen, D.L.; Roybal, S.L.

1994-08-01T23:59:59.000Z

297

Environmental geographic information system.  

Science Conference Proceedings (OSTI)

This document describes how the Environmental Geographic Information System (EGIS) was used, along with externally received data, to create maps for the Site-Wide Environmental Impact Statement (SWEIS) Source Document project. Data quality among the various classes of geographic information system (GIS) data is addressed. A complete listing of map layers used is provided.

Peek, Dennis; Helfrich, Donald Alan; Gorman, Susan

2010-08-01T23:59:59.000Z

298

Supplemental Environmental Assessment  

E-Print Network (OSTI)

In 2007, the U.S. Department of the Navy (Navy) prepared the Environmental Assessment for the Disposal of Naval Activity Puerto Rico (2007 EA) to evaluate the potential environmental impacts associated with the disposal of Naval Activity Puerto Rico (NAPR) in accordance with the

unknown authors

2011-01-01T23:59:59.000Z

299

Environmental Report 2007  

SciTech Connect

The purposes of the 'Lawrence Livermore National Laboratory Environmental Report 2007' are to record Lawrence Livermore National Laboratory's (LLNL's) compliance with environmental standards and requirements, describe LLNL's environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites--the Livermore site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL's Environmental Protection Department. Submittal of the report satisfies requirements under DOE Order 231.1A, Environmental Safety and Health Reporting, and DOE Order 5400.5, Radiation Protection of the Public and Environment. The report is distributed electronically and is available at https://saer.lln.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning in 1994 are also on the website. Some references in the electronic report text are underlined, which indicates that they are clickable links. Clicking on one of these links will open the related document, data workbook, or website that it refers to. The report begins with an executive summary, which provides the purpose of the report and an overview of LLNL's compliance and monitoring results. The first three chapters provide background information: Chapter 1 is an overview of the location, meteorology, and hydrogeology of the two LLNL sites; Chapter 2 is a summary of LLNL's compliance with environmental regulations; and Chapter 3 is a description of LLNL's environmental programs with an emphasis on the Environmental Management System including pollution prevention. The majority of the report covers LLNL's environmental monitoring programs and monitoring data for 2007: effluent and ambient air (Chapter 4); waters, including wastewater, storm water runoff, surface water, rain, and groundwater (Chapter 5); and terrestrial, including soil, sediment, vegetation, foodstuff, ambient radiation, and special status wildlife and plants (Chapter 6). Complete monitoring data, which are summarized in the body of the report, are provided in Appendix A. The remaining three chapters discuss the radiological impact on the public from LLNL operations (Chapter 7), LLNL's groundwater remediation program (Chapter 8), and quality assurance for the environmental monitoring programs (Chapter 9). The report uses Systeme International units, consistent with the federal Metric Conversion Act of 1975 and Executive Order 12770, Metric Usage in Federal Government Programs (1991). For ease of comparison to environmental reports issued prior to 1991, dose values and many radiological measurements are given in both metric and U.S. customary units. A conversion table is provided in the glossary.

Mathews, S; Gallegos, G; Berg, L L; Bertoldo, N A; Campbell, C G; Cerruti, S; Doman, J L; Ferry, L S; Grayson, A R; Jones, H E; Kumamoto, G; Larson, J; MacQueen, D H; Paterson, L; Revelli, M A; Ridley, M; Rueppel, D; Wegrecki, A M; Wilson, K; Woollett, J

2008-09-24T23:59:59.000Z

300

DRAFT ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 FINAL ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO RECORD HILL WIND LLC FOR CONSTRUCTION OF A WIND ENERGY PROJECT IN ROXBURY, MAINE U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 July 2011 DOE/EA-1824 i EXECUTIVE SUMMARY INTRODUCTION The U.S. Department of Energy (DOE) is proposing to issue a loan guarantee to Record Hill Wind LLC (Record Hill) for the construction of a 50.6 megawatt (MW) wind energy project located in Roxbury, Maine. 1 DOE has prepared this Final Environmental Assessment (EA) in compliance with the National Environmental Policy Act (NEPA) (42 United States Code [USC] 4321, et. seq.) Council on Environmental Quality regulations for implementing NEPA (40 Code of Federal Regulations

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Notices ENVIRONMENTAL PROTECTION AGENCY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

94 Federal Register 94 Federal Register / Vol. 74, No. 209 / Friday, October 30, 2009 / Notices ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-8798-8] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at 202-564-7146 or http://www.epa.gov/ compliance/nepa/. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated July 17, 2009 (74 FR 34754). Draft EISs EIS No. 20090290, ERP No. D-FTA- F54014-WI, Kenosha-Racine-Milwaukee

302

Environmental Monitoring Plan  

Science Conference Proceedings (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

1993-07-01T23:59:59.000Z

303

2009 Site Environmental Report  

SciTech Connect

Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of BNL's environmental performance during the calendar year in review. The SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and compliance, restoration, and surveillance monitoring program performance. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. The report is available in print and as a downloadable file on the BNL web page at http://www.bnl.gov/ewms/ser/. A summary of the SER is also prepared each year to provide a general overview of the report, and is distributed with a CD of the full report.

Ratel, K.M.; Brookhaven National Laboratory

2010-09-30T23:59:59.000Z

304

2005 SITE ENVIRONMENTAL REPORT  

Science Conference Proceedings (OSTI)

Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy (DOE). The report is written to inform the public, regulators, employees, and other stakeholders of BNL's environmental performance during the calendar year in review. The SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and compliance, restoration, and surveillance monitoring program performance. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. The report is available in print and as a downloadable file on the BNL web page at http://www.bnl.gov/ewms/ser/. A summary of the SER is also prepared each year to provide a general overview of the report, and is distributed with a CD of the full report.

BROOKHAVEN NATIONAL LABORATORY

2006-08-29T23:59:59.000Z

305

2006 SITE ENVIRONMENTAL REPORT  

Science Conference Proceedings (OSTI)

Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of BNL's environmental performance during the calendar year in review. The SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and compliance, restoration, and surveillance monitoring program performance. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. The report is available in print and as a downloadable file on the BNL web page at http://www.bnl.gov/ewms/ser/. A summary of the SER is also prepared each year to provide a general overview of the report, and is distributed with a CD of the full report.

BROOKHAVEN NATIONAL LABORATORY; RATEL,K.

2007-10-01T23:59:59.000Z

306

European Demonstration of CIM-Based Products  

Science Conference Proceedings (OSTI)

EPRI cosponsored demonstrations of Common Information Model (CIM)-based products in May 2006 during the first European meeting of the new CIM User Group. Nine vendors including ABB, Areva T&D, EDF and SUPELEC, ELES and Jelovac Solutions, KEMA, Siemens PTI, SISCO, SNC Lavalin and ENSICO, and the University of Strathclyde participated. Each vendor brought one or more products incorporating CIM standards. This report describes those products, the results of product demonstrations at the meeting, and attende...

2006-08-07T23:59:59.000Z

307

Oak Ridge National Contracts Overview  

E-Print Network (OSTI)

fired boiler wall and of a fission pressurised water reactor (PWR) Table 1 Design heat loads of divertor boiler wall (ABB) Design Surface heat flux (MW/m2 ) 0.2Average 0.7 3­5 1.5 10­200.3Maximum ­Maximum and fossil boiler wall, respectively. This substantial discrepancy has been taken into account in evolving

308

Design Evolution, Durability and Reliability of Alstom Heavy-Duty Gas Turbines: Pedigree Matrices, Volume 5  

Science Conference Proceedings (OSTI)

Advanced technology heavy-duty gas turbines carry a degree of technical risk because of new technologies used in their design. This report reviews the design evolution of specific Alstom (formerly ABB) industrial gas turbines in a standard format, which allows a qualitative and quantitative assessment of the technical risks involved in their operation. The report establishes a pedigree matrix, or qualitative analysis, for standard production and newly introduced heavy-duty gas turbines, including ...

2013-12-19T23:59:59.000Z

309

Design Evolution, Durability, and Reliability of Alstom Heavy-Duty Combustion Turbines: Pedigree Matrices, Volume 5  

Science Conference Proceedings (OSTI)

Advanced technology heavy-duty combustion turbines carry a degree of technical risk because of new technologies used in their design. This report reviews the design evolution of specific Alstom (formerly ABB) industrial combustion turbines in a standard format, which allows a qualitative and quantitative assessment of the technical risks involved in their operation. The report establishes a pedigree matrix, or qualitative analysis, for standard production and newly introduced heavy-duty combustion turbin...

2011-12-28T23:59:59.000Z

310

Roxboro Integrated Automation Project  

Science Conference Proceedings (OSTI)

EPRI, Carolina Power & Light (CP&L), and ASEA Brown Boveri (ABB) formed an alliance to develop and demonstrate automation technologies at CP&LOs Roxboro Plant. This alliance is governed by a Memorandum of Understanding that allows all parties to share in the success of the products developed, and to contribute to their commercialization. This research project is intended to demonstrate the economic benefits of efficient and useful plant-wide automation technologies for the utility industry. Successful im...

1997-01-12T23:59:59.000Z

311

CE IGCC repowering project: Materials for coal gasification environment. Topical report, June 1993  

Science Conference Proceedings (OSTI)

A task to develop material requirements and a materials testing strategy was established with the Materials and Water Chemistry Department of the ABB Power plant Laboratories. This involved examining the requirements for each system under ABB CE scope. The basis for the material recommendations was largely based on in-house test programs under DOE contract and ABB CE experience. Consultants were utilized in a parallel task to assist in the design and material specification for the solids handling systems. ABB CE experience includes operating data from a former process development unit (PDU) located in Windsor, Connecticut. The unit gasified Pittsburgh seam coal at a nominal firing rate of 120 tons per day. The objectives of the program were to produce clean, low-Btu gas from coal, and to provide the design information for scale-up to commercial-size plants. The results of the task were used to specify and, depending on scope, design the equipment used in the plant. A detailed document was developed and used to generate a Metallurgical Flow Diagram. Specifications were developed from this diagram. For the equipment designed, these selections were provided to representatives of cognizant design and manufacturing departments. In addition, where appropriate, recommendations were made for operating procedures and for design changes. Specified materials will be again evaluated during detailed engineering. In some areas the results of the task were not conclusive. Additional investigation will be required. These areas are the types of approaches which can be taken to accommodate product gas sulfidation resistance and solids transport erosion.

Gibbons, T.B.; O`Neill, J.K.; Plumley, A.L.; Thibeault, P.R.; Waryasz, R.W.

1993-10-01T23:59:59.000Z

312

Environmental Justice | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Justice Environmental Justice Environmental Justice Selected documents on the topic of Environmental Justice under NEPA. May 1, 2008 Environmental Justice Strategy In response to Executive Order 12898, DOE prepared and issued its Environmental Justice Strategy in 1995. Since then, the agency has conducted a series of activities to implement the Strategy. Both the Executive Order and the Strategy require that DOE establish and maintain an integrated approach for identifying, tracking, and monitoring environmental justice across the Department. July 1, 1999 Final Guidance for Consideration of Environmental Justice in Clean Air Act 309 Reviews This Environmental Protection Agency document provides guidance on reviewing and commenting on other federal agencies NEPA documents to help

313

Environmental monitoring via compressive sensing  

Science Conference Proceedings (OSTI)

Environmental monitoring aims to describe the state of the environment. It identifies environmental issues to show us how well our environmental objectives are being met. Traditional large-scale sensor networks for environmental monitoring suffers from ... Keywords: compressive sensing, environmental monitoring, information management, sensor networks

Shulin Yan; Chao Wu; Wei Dai; Moustafa Ghanem; Yike Guo

2012-08-01T23:59:59.000Z

314

The Office of Environmental Management Non-Defense Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Microsoft Word - PSRP Updates 6-25-10v2 The Office of Environmental Management (EM) Defense Environmental Cleanup The Office of Environmental Management Uranium Enrichment D&D...

315

NETL: Global Environmental Benefits  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Environmental Benefits Global Environmental Benefits Gasification Systems Global Environmental Benefits Environmental performance for future energy production systems is a much greater factor as emission standards tighten in the United States and worldwide. The outstanding environmental performance of gasification systems makes it an excellent technology for the clean production of electricity and other products. In addition, the reduction of CO2 emissions is one of the major challenges facing industry in response to global climate change. Other countries with coal reserves might potentially import technologies developed in the United States to enable low-cost gasification with carbon capture and EOR or sequestration. Not only will this benefit the U.S. gasification technology industry, but it will also result in a global environmental benefit through more affordable control of greenhouse gases (GHGs). See the U.S. Environmental Protection Agency (EPA) link below for a summary of the impact of fossil fuels without carbon capture on CO2 emissions, on the GHG contributions of different countries, and of the projected impact of developing countries to 2030:

316

1985 environmental monitoring report  

Science Conference Proceedings (OSTI)

The environmental monitoring program is designed to determine that BNL facilities operate such that the applicable environmental standards and effluent control requirements have been met. The data were evaluated using the appropriate environmental regulatory criteria. The environmental levels of radioactivity and other pollutants found in the vicinity of BNL during 1985 are summarized in this report. Detailed data are not included in the main body of the report, but are tabulated and presented in Appendix D. The environmental data include external radiation levels; radioactive air particulates; tritium concentrations; the amounts and concentrations of radioactivity in and the water quality of the stream into which liquid effluents are released; the water quality of the potable supply wells; the concentrations of radioactivity in biota from the stream; the concentrations of radioactivity in and the water quality of ground waters underlying the Laboratoy; concentrations of radioactivity in milk samples obtained in the vicinity of the Laboratory; and the 1984 strontium-90 data which was not available for inclusion in the 1984 Environmental Monitoring Report. In 1985, the results of the surveillance program demonstraed that the Laboratory has operated within the applicable environmental standards.

Day, L.E.; Miltenberger, R.P.; Naidu, J.R. (eds.)

1986-04-01T23:59:59.000Z

317

2003 SITE ENVIRONMENTAL REPORT  

SciTech Connect

Each year, Brookhaven National Laboratory (BNL), a multi-program national laboratory, prepares an annual Site Environmental Report (SER) in accordance with Order 231.1A, Environment, Safety and Health Reporting, of the U.S. Department of Energy (DOE). The SER is written to inform outside regulators, the public, and Laboratory employees of BNL's environmental performance during the calendar year in review, and to summarize BNL's on-site environmental data; environmental management performance; compliance with applicable DOE, Environmental Protection Agency (EPA), state, and local regulations; and environmental, restoration, and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. This report is intended to be a technical document. It is available in print and as a downloadable file on the BNL web page at http://www.bnl.ser.htm. A summary of the SER is also prepared each year to provide a general overview, and is distributed with a CD version of the full-length SER. The summary supports BNL's educational and community outreach program.

ENVIRONMENT AND WASTE MANAGMENT SERVICES DIVISION; ET AL.

2004-10-01T23:59:59.000Z

318

Environmental readiness document magnetohydrodynamics  

DOE Green Energy (OSTI)

The major areas of environmental concern with regard to the commercialization of coal-fired MHD generators are discussed. MHD technology and expectations about its future utilization are described. Information pertinent to the technology was drawn from the DOE technology program office and from an Environmental Development Plan developed for the technology by EV and the program office through an Environmental Coordination Committee. The environmental concerns associated with the technology are examined, and the current status of knowledge about each concern and its potential seriousness and manageability through regulation and control technology, is discussed. Present and projected societal capabilities to reduce and control undesirable environmental, health, safety, and related social impacts to a level of public acceptability -- as reflected in current and proposed environmental standards -- which will allow the technology to be commercialized and utilized in a timely manner are summarized. The ERD as a whole thus provides an assessment, within the limits of available knowledge and remaining uncertainties, of the future environmental readiness of the technology to contribute to the meeting of the Nation's energy needs. (WHK)

Not Available

1979-07-01T23:59:59.000Z

319

FINAL ENVIRONMENTAL ASSESSMENT FOR ENVIRONMENTAL SAFETY AND  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- - FOR ENVIRONMENTAL SAFETY AND HEALTH ANALYTICAL LABORATORY PROJECT NO. 94-AA-01 PANTEX PLANT AMAFsLLo, TEXAS June 1995 U.S. Department of E n e r g y Albuquerque Operations office Amarillo Area Office Pantex Plant P.O. Box 30030 Amarillo, Texas 79120 DISTRl6UTlON OF THIS DOCUMENT IS CMLtMmD FINAL ENVIRONMENTAL ASSESSMENT FOR June 1995 1 I U.S. Department of Energy Albuquerque Operations Office Amarillo Area m i c e Pantex Plant P.O. Box 30030 Amarillo, Texas 79120 DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. . --.-- - . . _ . I . . . . , . . . . . . . . . . - I I I TABLE OF CONTENTS m EXECUTIVESUMMARY .............................................. 1 1.0 PURPOSE AND NEED FOR AGENCY ACTION

320

National Environmental Policy Act Environmental Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31-10 31-10 u.s. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Restoration of drill pads, infiltration basins, sumps, and other surface areas at the Central Nevada Test Area, Nevada A. Brief Project/Activity Description The U.S. Department of Energy (DOE) Office of Legacy Management (LM) proposes to restore two drill pads with infiltration basins, two lined sumps, and miscellaneous surface areas associated with groundwater monitoring wells. A small crew of four people would take 2 weeks to complete this work in early September 2010. Disturbed areas would be hand-seeded with native plant species in November 2010. An attached figure shows all affected areas. Drill pads associated with groundwater monitoring wells MV-4 and MV-5 are each approximately 250 feet (ft)

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

CEQ Environmental Justice Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

JUSTICE JUSTICE Guidance Under the National Environmental Policy Act Council on Environmental Quality Executive Office of the President Old Executive Office Building, Room 360 Washington, D.C. 20502 (202)395-5750 http://www.whitehouse.gov/CEQ/ December 10, 1997 ii Table of Contents I. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 II. Executive Order 12898 and the Presidential Memorandum . . . . . . . . . . . . . 3 III. Executive Order 12898 and NEPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 A. NEPA Generally . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 B. Principles for Considering Environmental Justice under NEPA . . . . . . . . . . . . . 8 1. General Principles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 2. Additional Considerations . . . . . . . . . . . . . . . . . . . . . .

322

1986 environmental monitoring report  

SciTech Connect

The environmental levels of radioactivity and other pollutants found in the vicinity of BNL during 1986 are summarized in this report. The environmental data include external radiation levels; radioactive air particulates and halogens; tritium concentrations; the amounts and concentrations of radioactivity in and the water quality of the stream into which liquid effluents are released; the organics, radioactivity, and water quality of the potable supply wells; the concentrations of radioactivity in biota from the stream; and the concentrations of organics, radioactivity, and the water quality of ground waters underlying the Laboratory. In 1986, the results of the surveillance program demonstrated that the Laboratory has operated within the applicable environmental standards.

Miltenberger, R.P.; Royce, B.A.; Naidu, J.R. (eds.)

1987-06-01T23:59:59.000Z

323

Environmental management system.  

Science Conference Proceedings (OSTI)

The purpose of the Sandia National Laboratories/New Mexico (SNL/NM) Environmental Management System (EMS) is identification of environmental consequences from SNL/NM activities, products, and/or services to develop objectives and measurable targets for mitigation of any potential impacts to the environment. This Source Document discusses the annual EMS process for analysis of environmental aspects and impacts and also provides the fiscal year (FY) 2010 analysis. Further information on the EMS structure, processes, and procedures are described within the programmatic EMS Manual (PG470222).

Salinas, Stephanie A.

2010-08-01T23:59:59.000Z

324

PPPL Site Environmental Report  

SciTech Connect

Contained in the following report are data for radioactivity in the environment collected and analyzed by Princeton Plasma Physics Laboratory’s Princeton Environmental, Analytical, and Radiological Laboratory (PEARL). The PEARL is located on?site and is certified for analyzing radiological and non?radiological parameters through the New Jersey Department of Environmental Protection’s Laboratory Certification Program, Certification Number 12471. Non?radiological surface and ground water samples are analyzed by NJDEP certified subcontractor laboratories – QC, Inc. and Accutest Laboratory. To the best of our knowledge, these data, as contained in the “Annual Site Environmental Report for 2011,” are documented and certified to be correct.

Virginia Finley, Robeert Sheneman and Jerry Levine

2012-12-21T23:59:59.000Z

325

Environmental Review Branch  

E-Print Network (OSTI)

GE-Hitachi Global Laser Enrichment (GLE) submitted its Environmental Report on January 31, 2009 to construct and operate a laser enrichment facility. Since the original ER was finalized, the location of the entrance and roadway into the Wilmington Site has been revise. GLE hereby submits the GLE Environmental Report Supplement 2- Revised Entrance and Roadway to describe the environmental impacts of the change. If you have any questions, or require additional information, please contact Julie Olivier of my staff at 910-819-4799, or at Julie.Olivier@qe.com; or myself at 910-819-1925 or at Alberte.Kennedy @ pe.com.

Albert Kennedy; Andrea Kock Chief

2009-01-01T23:59:59.000Z

326

Final safety evaluation report related to the certification of the System 80{sup +} design (Docket No. 52-002). Volume 1, Chapters 1--14  

Science Conference Proceedings (OSTI)

This final safety evaluation report (FSER) documents the technical review of the System 80+ standard design by the US Nuclear Regulatory Commission (NRC) staff. The application for the System 80+ design was submitted by Combustion Engineering, Inc., now Asea Brown Boveri-Combustion Engineering (ABB-CE) as an application for design approval and subsequent design certification pursuant to 10 CFR {section} 52.45. System 80+ is a pressurized water reactor with a rated power of 3914 megawatts thermal (MWt) and a design power of 3992 MWt at which accidents are analyzed. Many features of the System 80+ are similar to those of Abb-CE`s System 80 design from which it evolved. Unique features of the System 80+ design included: a large spherical, steel containment; an in-containment refueling water storage tank; a reactor cavity flooding system, hydrogen ignitors, and a safety depressurization system for severe accident mitigation; a combustion gas turbine for an alternate ac source; and an advanced digitally based control room. On the basis of its evaluation and independent analyses, the NRC staff concludes that ABB-CE`s application for design certification meets the requirements of Subpart B of 10 CFR Part 52 that are applicable and technically relevant to the System 80+ standard design. This document, Volume 1, contains Chapters 1 through 14 of this report.

Not Available

1994-08-01T23:59:59.000Z

327

Final safety evaluation report related to the certification of the System 80{sup +} design (Docket No. 52-002). Volume 2, Chapters 15--22 and appendices  

SciTech Connect

This final safety evaluation report (FSER) documents the technical review of the System 80+ standard design by the US Nuclear Regulatory Commission (NRC) staff. The application for the system 80+ design was submitted by Combustion Engineering, Inc., now Asea Brown Boveri-Combustion Engineering (ABB-CE) as an application for design approval and subsequent design certification pursuant to 10 CFR {section} 52.45. System 80+ is a pressurized water reactor with a rated power of 3914 megawatts thermal (MWt) and a design power of 3992 MWt at which accidents are analyzed. Many features of the System 80+ are similar to those of ABB-CE`s System 80 design from which it evolved. Unique features of the System 80+ design include: a large spherical, steel containment; an in-containment refueling water storage tank; a reactor cavity flooding system, hydrogen ignitors and a safety depressurization system for severe accident mitigation; a combustion gas turbine for an alternate ac source; and an advanced digitally based control room. On the basis of its evaluation and independent analyses, the NRC staff concludes that ABB-CE`s application for design certification meets the requirements of Subpart B of 10 CFR Part 52 that are applicable and technically relevant to the System 80+ standard design. This document, Volume 2, contains Chapters 15 through 22 and Appendices A through E.

Not Available

1994-08-01T23:59:59.000Z

328

Field Demonstration of a Membrane Process to Separate Nitrogen from Natural Gas  

Science Conference Proceedings (OSTI)

The original proposal described the construction and operation of a 1 MMscfd treatment system to be operated at a Butcher Energy gas field in Ohio. The gas produced at this field contained 17% nitrogen. During pre-commissioning of the project, a series of well tests showed that the amount of gas in the field was significantly smaller than expected and that the nitrogen content of the wells was very high (25 to 30%). After evaluating the revised cost of the project, Butcher Energy decided that the plant would not be economical and withdrew from the project. Since that time, Membrane Technology and Research, Inc. (MTR) has signed a marketing and sales partnership with ABB Lummus Global, a large multinational corporation. MTR will be working with the company's Randall Gas Technology Group, a supplier of equipment and processing technology to the natural gas industry. Randall's engineering group first found a new site for the project at a North Texas Exploration (NTE) gas processing plant. The plant produced about 1 MMscfd of gas containing 24% nitrogen. The membrane unit was built to bring this gas to 4% nitrogen for delivery to the pipeline. The membrane skid was built by ABB. NTE ordered the required compressor and MTR made the membrane modules for a December 2004 delivery. However, the gas supply was not steady enough for field testing, and MTR/ABB have now located other sites for field testing and commercial development.

Kaaeid Lokhandwala

2005-12-22T23:59:59.000Z

329

Field Demonstration of a Membrane Process to Separate Nitrogen from Natural Gas  

Science Conference Proceedings (OSTI)

The original proposal described the construction and operation of a 1 MMscfd treatment system to be operated at a Butcher Energy gas field in Ohio. The gas produced at this field contained 17% nitrogen. During pre-commissioning of the project, a series of well tests showed that the amount of gas in the field was significantly smaller than expected and that the nitrogen content of the wells was very high (25 to 30%). After evaluating the revised cost of the project, Butcher Energy decided that the plant would not be economical and withdrew from the project. Since that time, Membrane Technology and Research, Inc. (MTR) has signed a marketing and sales partnership with ABB Lummus Global, a large multinational corporation. MTR is now working with the company's Randall Gas Technology Group, a supplier of equipment and processing technology to the natural gas industry. Randall's engineering group first found a new site for the project at a North Texas Exploration (NTE) gas processing plant. The plant produced about 1 MMscfd of gas containing 24% nitrogen. The membrane unit was built to bring this gas to 4% nitrogen for delivery to the pipeline. The membrane skid was built by ABB. NTE ordered the required compressor and MTR made the membrane modules for a December 2004 delivery. However, the gas supply was not steady enough for field testing, and MTR/ABB have now located other sites for field testing and commercial development.

Kaaeid Lokhandwala

2005-12-15T23:59:59.000Z

330

FIELD DEMONSTRATION OF A MEMBRANE PROCESS TO SEPARATE NITROGEN FROM NATURAL GAS  

Science Conference Proceedings (OSTI)

The original proposal described the construction and operation of a 1 MMscfd treatment system to be operated at a Butcher Energy gas field in Ohio. The gas produced at this field contained 17% nitrogen. During precommissioning of the project, a series of well tests showed that the amount of gas in the field was significantly smaller than expected and that the nitrogen content of the wells was very high (25 to 30%). After evaluating the revised cost of the project, Butcher Energy decided that the plant would not be economical and withdrew from the project. In early 2002, Membrane Technology and Research, Inc. (MTR) began to negotiate a marketing and sales partnership with ABB Lummus Global, a large multinational corporation. MTR and ABB Lummus have now completed negotiations and have signed a joint development, marketing and sales agreement with a focus on natural gas applications. Part of the agreement calls for the Randall Gas Technology division of ABB Lummus to provide cost share for the current project.

Dr. Andre Da Costa

2003-04-10T23:59:59.000Z

331

2012 Annual Planning Summary for Environmental Management  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Environmental Management.

332

Business Opportunities Session Office of Environmental Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Business Opportunities Session Office of Environmental Management Business Opportunities Session Office of Environmental Management Environmental Clean up Business Opportunities...

333

Preliminary Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Walla Walla-Tucannon River Transmission Line Walla Walla-Tucannon River Transmission Line Rebuild Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1731 Bonneville Power Administration May 2011 Walla Walla-Tucannon Transmission Line Rebuild Project 1 Revision Sheet for Final Environmental Assessment Revision Sheet for the Walla Walla-Tucannon River Transmission Line Rebuild Project Final Environmental Assessment DOE/EA-1731 Summary This revision sheet documents the changes to be incorporated into the Walla Walla-Tucannon River Transmission Line Rebuild Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final

334

Draft Supplemental Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Al Al b any, OR * Mo rg antow n , WV * Pitt, bu rg h , PA August 12, 20 II Dear Reader: The enclosed document, Draft Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative (supplemental EA; DOElEA- I 723S), was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). DOE prepared this supplemental EA to evaluate the potential environmental consequences of providing financial assistance under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. liS) to General Motors Limited Liability Company (GM) for its proposed project

335

Environmental report for 1989  

Science Conference Proceedings (OSTI)

This report documents the results of the Environmental Monitoring Program at the Lawrence Livermore National Laboratory (LLNL) and presents summary information about environmental compliance efforts for 1989. To enable evaluation of the effect of LLNL operations on the local environment, measurements were made at both the Livermore site and nearby Site 300 of direct radiation and a variety of radionuclides and chemical pollutants in ambient air, soil, sewage effluent, surface water, groundwater, vegetation, and foodstuff. Evaluations were made of LLNL's compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions to the environment. The monitoring data demonstrate that LLNL was in compliance with environmental laws and regulations concerning emission and discharge of materials to the environment. In addition, the monitoring data demonstrate that the environmental impacts of LLNL are minimal and pose no threat to the public or the environment. 98 refs., 40 figs., 77 tabs.

Sims, J.M.; Surano, K.A.; Lamson, K.C.; Brown, M.G.; Gallegos, G.M. (eds.)

1990-01-01T23:59:59.000Z

336

Environmentally safe fluid extractor  

DOE Patents (OSTI)

An environmentally safe fluid extraction device for use in mobile laboratory and industrial settings comprising a pump, compressor, valving system, waste recovery tank, fluid tank, and a exhaust filtering system.

Sungaila, Zenon F. (Orland Park, IL)

1993-01-01T23:59:59.000Z

337

FINAL ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2013 January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office JANUARY 2013 DOE/EA-1923 iv January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office January 2013 DOE/EA-1923 v January 2013 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: Final Environmental Assessment for the Green Energy School Wind Project (DOE/EA-1923) CONTACT: For additional copies or more information on this final Environmental Assessment (EA),

338

Notices ENVIRONMENTAL PROTECTION AGENCY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

076 Federal Register 076 Federal Register / Vol. 77, No. 250 / Monday, December 31, 2012 / Notices ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9006-8] Notice of Intent: Designation of an Expanded Ocean Dredged Material Disposal Site (ODMDS) off Charleston, South Carolina AGENCY: U.S. Environmental Protection Agency (EPA) Region 4. ACTION: Notice of Intent to prepare an Environmental Assessment (EA) for the designation of an expanded ODMDS off Charleston, South Carolina. Purpose: EPA has the authority to designate ODMDSs under Section 102 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1401 et seq.). It is EPA's policy to prepare a National Environmental Policy Document for all ODMDS designations (63 FR 58045, October 1998). FOR FURTHER INFORMATION, TO

339

ENVIRONMENTAL COMPLIANCE (EC)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL COMPLIANCE (EC) OBJECTIVE EC.1: LANL has established and implemented an Environmental Compliance program to ensure safe accomplishment of work and operations within the requirements of the BIO, TSRs, SER, and regulatory permits for WCRR Facility activities. Sufficient numbers of qualified personnel, as well as adequate facilities and equipment, are available to support WCRRF operations. (CRs 1, 4, 6, 7, 9) CRITERIA 1. WCRRF has implemented the requirements for hazardous materials and waste management programs, as described in the WCRRF BIO and TSRs (WCRRF TSRs 5.6.9 and 5.10.2). 2. Environmental permits required for WCRR operations have been met. Processes are in place to ensure that these requirements are maintained. Environmental regulations include Resource

340

RMOTC - Testing - Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Environmental Deer at RMOTC Notice: As of July 15th 2013, the Department of Energy announced the intent to sell Naval Petroleum Reserve Number 3 (NPR3). The sale of NPR-3 will also include the sale of all equipment and materials onsite. A decision has been made by the Department of Energy to complete testing at RMOTC by July 1st, 2014. RMOTC will complete testing in the coming year with the currently scheduled testing partners. For more information on the sale of NPR-3 and sale of RMOTC equipment and materials please join our mailing list here. RMOTC offers industrial infrastructure and has dedicated sites for long- and short-term environmental testing projects. It also maintains a close working relationship with the Wyoming Oil & Gas Conservation Commission and the Wyoming Department of Environmental

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Environmental Management System Plan  

SciTech Connect

Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environm

Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

2009-03-24T23:59:59.000Z

342

Environmental Approvals (Manitoba, Canada)  

Energy.gov (U.S. Department of Energy (DOE))

The Environmental Approvals Branch ensures that developments are regulated in a manner that protects the environment and public health, and sustains a high quality of life for present and future...

343

External > Programs > Environmental Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Haul Road Environmental Management The Oak Ridge Reservation is one of the U.S. Department of Energy's (DOE) most unique and complex sites, encompassing three major campuses and...

344

Environmental report 1992  

SciTech Connect

Lawrence Livermore National Laboratory (LLNL), a US Department of Energy facility operated by the University of California, serves as a national resource of scientific, technical, and engineering capability with a special focus on national security. During 1992, the Environmental Protection Department conducted sampling of air, sewage effluent, ground water, surface water, soil, vegetation and foodstuffs, and took measurements of environmental radiation. It performed more than 150,000 analyses of environmental samples. The analytical results are summarized in the chapters that follow, along with evaluations of the impact of radioactive and nonradioactive materials, a discussion of the effects of LLNL operations on the environment, and a summary of the activities undertaken to comply with local, state, and federal environmental laws.

Wilt, G.C. [ed.; Gallegos, G.M.; Wander, S.M. [and others

1992-12-31T23:59:59.000Z

345

2002 SITE ENVIRONMENTAL REPORT.  

Science Conference Proceedings (OSTI)

The 2002 Site Environmental Report (SER) is prepared in accordance with DOE Order 231.1, ''Environment, Safety and Health Reporting'', and summarizes the status of Brookhaven National Laboratory's (BNL) environmental programs and performance and restoration efforts, as well as any impacts, both past and present, that Laboratory operations have had on the environment. The document is intended to be technical in nature. A summary of the report is also prepared as a separate document to provide a general overview and includes a CD version of the full report. Operated by Brookhaven Science Associates (BSA) for the Department of Energy (DOE), BNL manages its world-class scientific research with particular sensitivity to environmental and community issues. BNL's motto, ''Exploring Life's Mysteries...Protecting its Future'', reflects BNL's management philosophy to fully integrate environmental stewardship into all facets of its missions, with a health balance between science and the environment.

BROOKHAVEN NATIONAL LABORATORY

2003-10-01T23:59:59.000Z

346

Exploring Civil and Environmental  

E-Print Network (OSTI)

,000 Drinking water supply system 1.6 million km Waste water treatment facilities (publicly owned) 16,000 TRB is a profession that applies technology to meet society's needs. · Civil and environmental engineers are essential

347

Environmental Management System Plan  

E-Print Network (OSTI)

3) environmental management programs, (4) training, (5)Management Programs3-5 Structure and Responsibility.3-6 Training,Management System Plan Program Elements Additional information regarding EMS training

Fox, Robert

2009-01-01T23:59:59.000Z

348

Environmental Data Bank  

SciTech Connect

In an effort to determine the environment to which the equipment designed by Sandia Corporation will be exposed, a "Data Bank" of environmental information was compiled. Measured quantities resulting from actual uses were continually being summarized.

,

1962-06-01T23:59:59.000Z

349

NREL: Sustainable NREL - Environmental Stewardship  

NLE Websites -- All DOE Office Websites (Extended Search)

excellent environmental stewardship of its campuses into a highly replicable sustainability strategy, minimizing the environmental impacts of the lab's activities. Through...

350

Environmental Energy Technologies Division News  

NLE Websites -- All DOE Office Websites (Extended Search)

2, No. 2 http:eetd.lbl.govnewsletternl45 Environmental Energy Technologies Division News http:eetd.lbl.govnewsletter 2013 Environmental Energy Technologies Division...

351

Biological & Environmental Research Abstracts Database  

Office of Scientific and Technical Information (OSTI)

Welcome to the Biological and Environmental Research Abstracts Database The U.S. Department of Energy's Office of Biological and Environmental Research (BER) conducts research in...

352

Environmental Energy Technologies Division News  

NLE Websites -- All DOE Office Websites (Extended Search)

1, No. 1 http:eetd.lbl.govnewsletternl40 Environmental Energy Technologies Division News http:eetd.lbl.govnewsletter 2012 Environmental Energy Technologies Division...

353

Environmental Energy Technologies Division News  

NLE Websites -- All DOE Office Websites (Extended Search)

1, No. 2 http:eetd.lbl.govnewsletternl41 Environmental Energy Technologies Division News http:eetd.lbl.govnewsletter 2012 Environmental Energy Technologies Division...

354

Environmental Justice | Open Energy Information  

Open Energy Info (EERE)

Page Edit History Facebook icon Twitter icon Environmental Justice Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleEnvironmentalJustice&oldid...

355

2012 BNL Site Environmental Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Environmental Reports Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1B, Environment,...

356

Geothermal environmental overview project  

DOE Green Energy (OSTI)

The basic purpose of the Geothermal Environmental Overview Project is to summarize and assess the state of environmental issues of the top priority KGRAs from among the 37 KGRAs currently identified by the Division of Geothermal Energy as having possibility for commercial development. The objectives of the Overview Project are inventory of available data, assessment of available data, identification of data gaps, and identification of key issues. (JGB)

Anspaugh, L.R.

1977-10-25T23:59:59.000Z

357

College of Environmental Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management College of Environmental Management College of Environmental Management Mission The College of Environmental Management (CEM) mission is to provide EM...

358

Science for Environmental Management Enhancing environmental problem solving  

E-Print Network (OSTI)

Science for Environmental Management Enhancing environmental problem solving MEES 698Y Special Topics in Marine-Estuarine-Environmental Sciences Spring Semester 2013; Wednesdays 3:30-6:30pm Course will be taught on the Interactive Video Network (IVN) is course will address the role of science in environmental

Boynton, Walter R.

359

2010 Site Environmental Report  

SciTech Connect

Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory's environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. Volume II of the SER, the Groundwater Status Report, also is prepared annually to report on the status of and evaluate the performance of groundwater treatment systems at the Laboratory. Volume II includes detailed technical summaries of groundwater data and its interpretation, and is intended for internal BNL users, regulators, and other technically oriented stakeholders. A brief summary of the information contained in Volume II is included in Chapter 7, Groundwater Protection, of this volume. Both reports are available in print and as downloadable files on the BNL web page at http://www.bnl.gov/ewms/ser/. An electronic version on compact disc is distributed with each printed report. In addition, a summary of Volume I is prepared each year to provide a general overview of the report, and is distributed with a compact disc containing the full report. BNL is operated and managed for DOE's Office of Science by Brookhaven Science Associates (BSA), a partnership formed by Stony Brook University and Battelle Memorial Institute. For more than 60 years, the Laboratory has played a lead role in the DOE Science and Technology mission and continues to contribute to the DOE missions in energy resources, environmental quality, and national security. BNL manages its world-class scientific research with particular sensitivity to environmental issues and community concerns. The Laboratory's motto, 'Exploring Life's Mysteries...Protecting its Future,' and its Environmental, Safety, Security and Health Policy reflect the commitment of BNL's management to fully integrate environmental stewardship into all facets of its mission and operations.

Ratel, K.; Lee, R; Remien, J; Hooda, B; Green, T; Williams, J; Pohlot, P; Dorsch, W; Paquette, D; Burke, J

2011-10-01T23:59:59.000Z

360

SRS Environmental Report 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Environmental Report Summary Environmental Report - 2012 Environmental Data / Maps - 2012 EMS Description Manual Environmental Dose Assessment Manual Environmental Policy SRAP SREL SRNS Annual Report Savannah River Remediation USFS-SR References SRS spacer Bottomland Hardwood Forest bottomland hardwood/floodplain forest Front Cover - David Scott of the Savannah River Ecology Laboratory (SREL) provided this year's cover photo. The photo was taken in the Mixed Swamp Forest Set-Aside, which is part of the Savannah River swamp. This Set-Aside is one of the original ten SREL habitat reserve areas selected in 1968 to represent a diversity of bottomland hardwood/floodplain forest communities of a southern river swamp system. Represented are aquatic, semi-aquatic, and terrestrial habitats associated with cypress-tupelo ponds, mixed hardwood sloughs, and mixed hardwood ridges. This Set-Aside is important because seasonally flooded hardwood forests are becoming increasingly rare habitats that are particularly vulnerable to habitat destruction and/or alteration due to drainage, water control projects, industrial or urban waste discharge, or power plant cooling effluents. The flower in the foreground is called Lizard's Tail (Latin name Saururus cernuus). It grows in a variety of aquatic habitats, but on SRS it can be particularly abundant in some of the swamp forests

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

1984 environmental monitoring report  

Science Conference Proceedings (OSTI)

The environmental monitoring program has been designed to ensure that BNL facilities operate such that the applicable environmental standards and effluent control requirements have been met. A listing, as required by DOE Order 5484.1 of BNL facilities, of environmental agencies and permits is provided in the Environmental Program Information Section 3.0, Table B. Since the aquifer underlying Long Island has been designated a ''sole source'' aquifer, the Environmental Protection Agency (EPA) Drinking Water Standards have been used in the assessment of ground water data. However, the limits prescribed in the regulations are not directly applicable to the monitoring well data since (1) the standards apply to a community water supply system, i.e., one serving more than 25 individuals, and (2) the standards represent an annual average concentration. Since the monitoring wells are not components of the Laboratory's water supply system, the EPA drinking water standards are employed as reference criteria to which the surveillance well data is compared. The standards also serve as guidance levels for any appropriate remedial action. 36 refs., 9 figs., 40 tabs.

Day, L.E.; Miltenberger, R.P.; Naidu, J.R. (eds.)

1985-04-01T23:59:59.000Z

362

2004 SITE ENVIRONMENTAL REPORT  

Science Conference Proceedings (OSTI)

Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy (DOE). The SER is written to inform the public, regulators, Laboratory employees, and other stakeholders of BNL's environmental performance during the calendar year in review. The report summarizes BNL's environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. The SER is intended to be a technical document. It is available in print and as a downloadable file on the BNL web page at http://www.bnl.gov/esd/SER.htm. A summary of the SER is also prepared each year to provide a general overview of the report, and is distributed with a CD version of the full report. The summary supports BNL's educational and community outreach program.

BROOKHAVEN NATIONAL LABORATORY; SER TEAM; ENVIRONMENTAL INFORMATION MANAGEMENT SERVICES GROUP; ENVIROMENTAL AND WASTE MANAGEMENT SERVICES DIVISION FIELD SAMPLING TEAM; (MANY OTHER CONTRIBUTORS)

2005-08-22T23:59:59.000Z

363

2007 Site Environmental Report  

Science Conference Proceedings (OSTI)

Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory's environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. Volume II of the SER, the Groundwater Status Report, also is prepared annually to report on the status of and evaluate the performance of groundwater treatment systems at the Laboratory. Volume II includes detailed technical summaries of groundwater data and its interpretation, and is intended for internal BNL users, regulators, and other technically oriented stakeholders. A brief summary of the information contained in Volume II is included in this volume in Chapter 7, Groundwater Protection. Both reports are available in print and as downloadable files on the BNL web page at http://www.bnl.gov/ewms/ser/. An electronic version on compact disc is distributed with each printed report. In addition, a summary of Volume I is prepared each year to provide a general overview of the report, and is distributed with a compact disc containing the-length report.

Ratel,K.

2008-10-01T23:59:59.000Z

364

Safety Environmental Laboratories & Consulting Inc.  

Science Conference Proceedings (OSTI)

Safety Environmental Laboratories & Consulting Inc. NVLAP Lab Code: 200873-0. Address and Contact Information: 989 ...

2013-09-27T23:59:59.000Z

365

EA-0995: Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE))

Drum Storage Facility for Interim Storage of Materials Generated by Environmental Restoration Operations

366

Argonne TDC: Asset Environmental Services  

Small business teams with Argonne for urban revitalization effort. Asset Environmental Services Chicago, IL

367

EA-1143: Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE))

Environmental Evaluation Notification Form for University of Nebraska Medical Center: Lied Transplant Center

368

The National Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Environmental Serving an Essential Research Park at Mission for 25 Years Savannah River Site This document is PL^LICLY EAWidg r _ Autho ing Official Daft " / 2 a_"7 Savannah River Site South Carolina Aiken * Augusta Georgia Miles 10 0 10 20 30 The University of Georgia Savannah River Ecology Laboratory Dear Reader, Early in 1970, President Richard M. Nixon endorsed and ordered the implementation of 10 recommendations he had received from the Office of Science and Technology sub- sequent to the concurrence of the newly formed Council on Environmental Quality. The tenth recommendation included the following statement: "In view of the importance of preserving natural areas throughout the world, the con- cerned Federal agencies should accelerate their efforts to set aside representative loca-

369

DOEEA-1203 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

203 203 ~ Environmental Assessment Trench 33 Widening in 21 8-W-5 Low-Level Burial Ground, Hanford Site, Richland, Washington U.S. Department of Energy Richland, Washington ENVIRONMENTAL ASSESSMENT FOR TRENCH 33 WIDENING IN 21 8-W-5 LOW-LEVEL BURIAL GROUND, HANFORD SITE, RICHLAND, WASHINGTON U.S. DEPARTMENT OF ENERGY RICHLAND, WASHINGTON JULY 1997 U.S. Department o f Energy DOE/ EA- 1203 This page intentionally left blank. Envi ronmental Assessment J u l y 1997 Portions of this document m y be iliegiile i n electronic image prodads. b a g s are pFoduced from the best adhble original dOCUXllent, DOE/EA-1203 U.S. Department o f Energy Preface PREFACE This envi ronmental assessment (EA) has been prepared t o assess potential environmental impacts associated with the U.S. Department o

370

The Environmental Chamber  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 The Environmental Chamber Al Hodgson and Richard Allen test methyl chloride exposures using the environmental chamber. On the second floor of an unremarkable building at LBL, researchers are using a room within a room to smoke out indoor air pollutants. The environmental chamber is a stainless-steel-lined room of 540 ft cubed (20 meters cubed) which can be operated in several ways to meet the needs of different research projects, including studies for which a very low background is required. Scientists of the Indoor Environment Program and their collaborators use the chamber as a controlled indoor environment to study the behavior of a variety of indoor pollutants ranging from cigarette smoke to volatile organic compounds (VOCs) from new carpets. At the moment, four projects use the facility. Principal investigator Al

371

NETL: Site Environmental Quality  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Environmental Quality Site Environmental Quality About NETL Site Environmental Quality - Certified to ISO 14001:2004 Questions about NETL's Environment, Safety and Health Management System may be directed to Michael Monahan, 304-285-4408, michael.monahan@netl.doe.gov. NETL has implemented an Environment, Safety and Health (ES&H) Management System, based on DOE's Integrated Safety Management System, the International Organization for Standardization (ISO) 14000 series, and the Occupational Health and Safety Assessment (OHSAS) 18000 series. While the original scope of the ES&H Management System included the Morgantown and Pittsburgh sites, in fiscal year 2010, the Albany site was incorporated into the existing ES&H Management System. In addition, all three sites underwent ISO 14001:2004 recertification audits and Morgantown and

372

SN Environmental Review (NEPA)  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Rates You are here: SN Home page > Environment Environmental Review-NEPA Major Initiatives are the large projects that SNR is currently involved in. As new projects are added, and existing ones completed, you will find current information and updates in this area. Environmental Impact Statement-EIS Sacramento Area Voltage Support Trinity PUD Interconnection Projects Alternative Intake Project Transmission Line and Interconnection Delta-Mendota Canal / California Aqueduct Intertie (PDF - 17MB) Sutter Power Project San Luis Transmission Project Environmental Assessment-EA San Joaquin Valley Right-of-Way Maintenance Project North Area Right-of-Way Maintenance Project Sacramento Valley Right-of-Way Maintenance Project Categorical Exclusions-CX Cottonwood - Roseville OPGW Project CX (PDF - 6787KB)

373

Notices ENVIRONMENTAL PROTECTION AGENCY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25 Federal Register 25 Federal Register / Vol. 76, No. 209 / Friday, October 28, 2011 / Notices ENVIRONMENTAL PROTECTION AGENCY [FRL-9484-2] Children's Health Protection Advisory Committee (CHPAC); Notice of Charter Renewal AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of Charter Renewal. Notice is hereby given that the Environmental Protection Agency (EPA) has determined that, in accordance with the provisions of the Federal Advisory Committee Act (FACA), 5 U.S.C. App.2. The Children's Health Protection Advisory Committee (CHPAC) is a necessary committee which is in the public interest. Accordingly, CHPAC will be renewed for an additional two- year period. The purpose of CHPAC is to provide advice and recommendations to the Administrator of EPA on issues

374

United States Environmental Monitoring  

Office of Legacy Management (LM)

EPA 60014-91/030 EPA 60014-91/030 Environmental Protection Systems Laboratory DOE/DP00539-063 Agency P.O. Box 93478 Las Vegas NV 891 93-3478 Research and Development Offsite Environmental Monitoring Report: 1 - 3 5 Radiation Monitorina Around * / (- P 7 1 United States ~ u c l g a r Test Areas Calendar Year 1990 This page intentionally left blank EPN60014-90 DOWDP Offsite Environmental Monitoring Report: Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1990 Contributors: D.J. Chaloud, B.B. Dicey, D.G. Easterly, C.A. Fontana, R.W. Holloway, A.A. Mullen, V.E. Niemann, W.G. Phillips, D.D. Smith, N.R. Sunderland, D.J. Thome, and Nuclear Radiation Assessment Division Prepared for: U.S. Department of Energy under Interagency Agreement Number DE-A108-86-NV10522

375

Notices ENVIRONMENTAL PROTECTION AGENCY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22 Federal Register 22 Federal Register / Vol. 75, No. 103 / Friday, May 28, 2010 / Notices ENVIRONMENTAL PROTECTION AGENCY [FRL-9156-1] Office of Research and Development; Ambient Air Monitoring Reference and Equivalent Methods: Designation of One New Equivalent Method AGENCY: Environmental Protection Agency. ACTION: Notice of the designation of one new equivalent method for monitoring ambient air quality. SUMMARY: Notice is hereby given that the Environmental Protection Agency (EPA) has designated, in accordance with 40 CFR Part 53, one new equivalent method for measuring concentrations of lead (Pb) in total suspended particulate matter (TSP) in the ambient air. FOR FURTHER INFORMATION CONTACT: Surender Kaushik, Human Exposure and Atmospheric Sciences Division (MD-D205-03), National Exposure

376

Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Environmental Assessment for the GILA-NORTH GILA TRANSMISSION LINE REBUILD AND UPGRADE PROJECT (DOE/EA-1948) December 2013 Prepared for U.S. Department of Energy Western Area Power Administration, Desert Southwest Region Prepared by Cooperating Agencies U.S. Bureau of Reclamation, Yuma Area Office U.S. Army Corps of Engineers, Los Angeles District DRAFT Gila to North Gila Transmission Line Rebuild and Upgrade Project Environmental Assessment Prepared for: U.S. Department of Energy Western Area Power Administration Desert Southwest Region Cooperating Agencies: U.S. Bureau of Reclamation Yuma Area Office U.S. Army Corps of Engineers Los Angeles District Prepared by: December 2013 Gila to North Gila Transmission Line Rebuild and Upgrade Project

377

The environmental dictionary  

Science Conference Proceedings (OSTI)

The Environmental Dictionary was designed for individuals researching environmental regulations in the Code of Federal Regulations, Title 40, Protection of the Environment (40 CFR). This book defines the highly technical and sometimes confusing terminology used throughout 40 CFR. Definitions are from two sources: (1) Code of Federal Regulations, Title 40, Protection of the Environment, Revised as of July 1, 1987, and (2) The Federal Register (updates pertaining to 40 CFR) for the period covering 1 July 1987 through 30 June 1989. The Dictionary contains numerous cross-referencing and finding aids. Beyond its use in interpreting Title 40 regulations, the Dictionary may be of value to individuals that are in need of a dictionary that covers the myriad of technical terms used in the environmental sciences including the biological, chemical, legal, and planning aspects.

King, J.J. (ed.)

1989-01-01T23:59:59.000Z

378

The environmentally safe battery  

SciTech Connect

There are three aspects to an environmentally safe battery. The first deals with the manufacturing process, the second with the use of environmentally friendly materials, and the third with the disposal and/or recycling of spent units. In this paper, several ongoing programs at Sandia National Laboratories that relate to the environmentally conscious manufacturing of batteries, are discussed. The solvent substitution/elimination program is a two-pronged effort, aimed at identifying new solvents which are compatible with the environment, while at the same time developing dry process cleaning technology. The joining program is evaluating new solvents for flux removal as well as the development of fluxless soldering processes. In the area of welding, new cleaning processes are under study. Chemical microsensors are under development that are capable of identifying and quantifying single chemical species. These sensors have been used to monitor and improve processes using toxic/hazardous solvents. 1 ref., 1 fig.

Levy, S.C.; Brown, N.E.

1991-01-01T23:59:59.000Z

379

Summary Site Environmental Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Environmental Report Site Environmental Report for Calendar Year 2011 ANL-12/02 (Summary) Environment, Safety, and Quality Assurance Division Argonne National Laboratory Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor UChicago Argonne, LLC, nor any of their employees or officers, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product,

380

Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95 95 :&,, ' - , i . -- Final Environmental Assessment for Device Assembly - Facility Operations f 3: >fi - , - , ' , 7 - . ' ' , , . I 8 ' , :-<:- L , a . ' ' ' -L. -1 , , ~ e m - . - I ! - , - # 8 , r I I , , , - , . .-- - ' - I S - . ! - , - , Y 2 L - . . 8 : L.-- , r Nevada ' f e s t ~ h e , Nye county, Nevada U. S. Department Of Energy - , 8 - - . 8 - I,, ' - 8 - - , , 8 ENVIRONMENTAL ASSESSMENT for DEVICE ASSEMBLY FACIUTY OPERATIONS MAY 1995 TABLE OF CONTENTS LISTOFFIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv USTOFTABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .iv A. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 8. PURPOSE AND NEED FOR ACTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 B.1 Purpose and Need for Action . . . . . . . . . . . . . . . .

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Environmental impact report (draft)  

DOE Green Energy (OSTI)

The three projects as proposed by Pacific Gas and Electric Company and the environmental analysis of the projects are discussed. Sections on the natural and social environments of the proposed projects and their surrounding areas consist of descriptions of the setting, discussions of the adverse and beneficial consequences of the project, and potential mitigation measures to reduce the effects of adverse impacts. The Environmental Impact Report includes discussions of unavoidable adverse effects, irreversible changes, long-term and cumulative impacts, growth-inducing effects, and feasible alternatives to the project. (MHR)

Not Available

1980-05-01T23:59:59.000Z

382

Biological and Environmental Research  

E-Print Network (OSTI)

to the missions of the Department of Energy. The multidisciplinary BioEnergy Science Center (BESC) has already to their future contributions in this area of research. ORNL also established the Center for BioEnergy the sustainability (environmental, economic, and social) of current and future bioenergy production and distribution

383

1994 Site environmental report  

Science Conference Proceedings (OSTI)

The Fernald site is a Department of Energy (DOE)-owned facility that produced high-quality uranium metals for military defense for nearly 40 years. DOE suspended production at the site in 1989 and formally ended production in 1991. Although production activities have ceased, the site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. The Site Environmental Report (SER) is prepared annually in accordance with DOE Order 5400.1, General Environmental Protection Program. This 1994 SER provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, U.S. Environmental Protection Agency (USEPA), and Ohio EPA (OEPA). For some readers, the highlights provided in this Executive Summary may provide sufficient information. Many readers, however, may wish to read more detailed descriptions of the information than those which are presented here. All information presented in this summary is discussed more fully in the main body of this report.

NONE

1995-07-01T23:59:59.000Z

384

Biological and Environmental Research  

E-Print Network (OSTI)

BESC and throughout the scientific community. The Climate Change Science Institute (CCSI) has had its 2010 #12;Oak Ridge National Laboratory (ORNL) conducts basic and applied research and development in the Biological and Environmental Sciences Directorate (BESD) at the Oak Ridge National Laboratory (ORNL) perform

385

Environmental Report 1996  

SciTech Connect

This summary provides an overview of LLNL`s environmental activities in 1996, including radiological and nonradiological surveillance, effluent and compliance monitoring, remediation, assessment of radiological releases and doses, and determination of the impact of LLNL operations on the environment and public health.

Harrach, R.J.

1996-01-01T23:59:59.000Z

386

1999 SITE ENVIRONMENTAL REPORT  

SciTech Connect

Throughout the scientific community, Brookhaven National Laboratory (BNL) is renowned for its leading-edge research in physics, medicine, chemistry, biology, materials, and the environment. BNL is committed to supporting its world-class scientific research with an internationally recognized environmental protection program. The 1999 Site Environmental Report (SER) summarizes the status of the Laboratory's environmental programs and performance, including the steady progress towards cleaning up the site and fully integrating environmental stewardship into all facets of the Laboratory's mission. BNL is located on 5,265 acres of pine barrens in Suffolk County in the center of Long Island, New York. The Laboratory is situated above a sole source aquifer at the headwaters of the Peconic River; therefore, protecting ground and surface water quality is a special concern. Approximately 3,600 acres of the site are undeveloped and serve as habitat for a wide variety of animals and plants, including one New York State endangered species, the tiger salamander, and two New York State threatened species, the banded sunfish and the stiff goldenrod. Monitoring, preserving, and restoring these ecological resources is a high priority for the Laboratory.

ENGEL-COX,J.; ZIMMERMAN,E.; LEE,R.; WILLIAMS,J.; GREEN,T.; PAQUETTE,D.; HOODA,B.; SCARPITTA,S.; GENZER,P.; ET AL

2000-09-01T23:59:59.000Z

387

Simplifying environmental model reuse  

Science Conference Proceedings (OSTI)

The environmental modelling community has developed many models with varying levels of complexity and functionality. Many of these have overlapping problem domains, have very similar 'science' and yet are not compatible with each other. The modelling ... Keywords: APSIM, Component, Framework independent, Interoperability, Model, Simulation

Dean P. Holzworth; Neil I. Huth; Peter G. de Voil

2010-02-01T23:59:59.000Z

388

INITIAL ENVIRONMENTAL EXAMINATION (DRAFT)  

E-Print Network (OSTI)

The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Royal Government of Bhutan Asian Development Bank

I. Executive Summary

2010-01-01T23:59:59.000Z

389

Environmental in Lithographic  

E-Print Network (OSTI)

DisposalRestriction LED lightemittingdiode LEED LeadershipinEnergyandEnvironmentalDesign LIE LongIslandExpressway LIMSSafetyandOperations ComplianceAssuranceProcess TCE* trichloroethylene TCLP toxicitycharacteristicleachingprocedure TEAM) ­ Growing public awareness and concern for controlling water pollution led to enactment of the Federal Water

Zanibbi, Richard

390

Environmental Biosciences Quarterly Report  

SciTech Connect

In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems. Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene and low-dose ionizing radiation. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the DOE. Plans for restructuring the performance schedule of the trichloroethylene projects have been submitted to the department. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making. Questions, comments or requests for further information concerning the activities under this cooperative agreement can be forwarded to Dr. Lawrence C. Mohr in the EBP office of the Medical University of South Carolina at (843) 792-1532.

Lawrence C. Mohr, M.D.

2007-01-31T23:59:59.000Z

391

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statements and Environmental Assessments Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart This chart represents anticipated activity and is not a commitment for documentation or dates. October 21, 2011 EIS-0426: Notice of Extension of Public Comment Period for the Draft Site-Wide Environmental Impact Statement Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada September 26, 2011 EA-1792: Finding of No Significant Impact University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine September 26, 2011 EA-1792: Final Environmental Assessment University of Maine's DeepWater Offshore Floating Wind Turbine Testing and

392

INTERNATIONAL COLLABORATION ON CO2 SEQUESTRATION  

Science Conference Proceedings (OSTI)

The ocean represents the largest potential sink for anthropogenic CO{sub 2}. In order to better understand this potential, Japan, Norway, and the United States signed a Project Agreement for International Collaboration on CO{sub 2} Ocean Sequestration in December 1997; since that time, Canada and ABB (Switzerland) have joined the project. The objective of the project is to investigate the technical feasibility of, and improve understanding of the environmental impacts from, CO{sub 2} ocean sequestration in order to minimize the impacts associated with the eventual use of this technique to reduce greenhouse gas concentrations in the atmosphere. The project will continue through March 31, 2002, with a field experiment to take place in the summer of 2000 off the Kona Coast of Hawaii. The implementing research organizations are the Research Institute of Innovative Technology for the Earth (Japan), the Norwegian Institute for Water Research (Norway), and the Massachusetts Institute of Technology (USA). The general contractor for the project will be the Pacific International Center for High Technology Research in Hawaii. A Technical Committee has been formed to supervise the technical aspects and execution of this project. The members of this committee are the co-authors of this paper. In this paper we discuss key issues involved with the design, ocean engineering, measurements, siting, and costs of this experiment.

H.J. Herzog; E.E. Adams

1999-08-23T23:59:59.000Z

393

Development and design of an advanced pulverized coal-fired system  

SciTech Connect

Under the US Department of Energy (DOE) project `Engineering Development of Advanced Coal-Fired Low-Emission Boiler Systems` (LEBS) the ABB team developed the design of a 400 MWe advanced pulverized coal fired electric generating system. The work and the results are described in the paper. Early work included concept development and evaluation of several subsystems for controlling the emission of SO{sub 2}, NO{sub x}, particulates and for reducing wastes. Candidate technologies were then evaluated in various combinations as part of complete advanced supercritical power generation systems. One system was selected for the design of the advanced generating system. Pilot scale testing is now being conducted to support the design of subsystems. The design meets the overall objective of the LEBS Project by dramatically improving environmental performance of pulverized coal fired power plants without adversely impacting efficiency or the cost of electricity. Advanced technologies will be used to reduce NO{sub x}, SO{sub 2}, and particulate emissions to one-fifth to one-tenth of current NSPS limits. Air toxics will be in compliance, and wastes will be reduced and made more disposable. Net station (HHV) efficiency can be increased to 45 percent without increasing the cost of electricity.

Regan, J.W.; Borio, R.W.; Palkes, M. [ABB Power Plant Laboratories (United States); Mirolli, M.D. [ABB Combustion Engineering, Inc., Windsor, CT (United States); Wesnor, J.D. [ABB Environmental Systems, Birmingham, AL (United States); Bender, D.J. [Raytheon Engineers & Constructors, Inc. (United States)

1995-12-31T23:59:59.000Z

394

Environmental Monitoring Plan  

SciTech Connect

Environmental monitoring personnel from Lawrence Livermore National Laboratory (LLNL) prepared this ''Environmental Monitoring Plan'' (EMP) to meet the requirements in the U.S. Department of Energy (DOE) ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' (DOE 1991) and applicable portions of DOE Orders 5400.1 and 5400.5 (see WSS B93 and B94 in Appendix B). ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' is followed as a best management practice; under Work Smart Standards, LLNL complies with portions of DOE Orders 5400.1 and 5400.5 as shown in Appendix B. This document is a revision of the May 1999 EMP (Tate et al. 1999) and is current as of March 1, 2002. LLNL is one of the nation's premier applied-science national security laboratories. Its primary mission is to ensure that the nation's nuclear weapons remain safe, secure, and reliable, and to prevent the spread and use of nuclear weapons worldwide. LLNL's programs in advanced technologies, energy, environment, biosciences, and basic science apply LLNL's unique capabilities and enhance the competencies needed for this national security mission. LLNL's mission also involves working with industrial and academic partners to increase national competitiveness and improve science education. LLNL's mission is dynamic and has changed over the years to meet new national needs. In keeping with the Laboratory's mission, the environment, safety, and health (ES&H) have top priority. LLNL's policy is to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage. The environment, safety, and health are to be priority considerations in the planning and execution of all work activities at the Laboratory (LLNL 2001). Furthermore, it is the policy of LLNL to comply with applicable ES&H laws, regulations, and requirements. Under Contract 48, Appendix F, the Laboratory commits to minimizing its waste streams and to avoiding adverse impacts to the environment from its operations (UC/DOE 2001).

Althouse, P E; Biermann, A; Brigdon, S L; Brown, R A; Campbell, C G; Christofferson, E; Clark, L M; Folks, K J; Gallegos, G M; Gouveia, F J; Grayson, A; Harrach, R J; Hoppes, W G; Jones, H; Mathews, S; Merrigan, J R; Peterson, S R; Revelli, M; Rueppel, D; Sanchez, L; Tate, P J; Vellinger, R J; Ward, B; Williams, R

2006-01-10T23:59:59.000Z

395

Environmental Occupational Health Protection Laws  

E-Print Network (OSTI)

The manufacturing, processing, and use of chemicals and materials in industrial, workplaces are often accompanied by environmental, health, and safety hazards and risks. Occupational and environmental factors cause or ...

Ashford, Nicholas

2008-01-01T23:59:59.000Z

396

Energy, Environmental & Economic Systems Analysis  

E-Print Network (OSTI)

Energy, Environmental & Economic Systems Analysis GTMax: A New Deregulated Power Market Analysis Tool Opportunity Decision and Information Sciences Division Center for Energy, Environmental & Economic hourly energy transactions, costs, and revenues. GTMax has a user-friendly geographical information

Kemner, Ken

397

Environmental Justice | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Justice Environmental Justice Environmental Justice Environmental Justice The U.S. Department of Energy (Department) would like to direct your attention to its Environmental Justice Strategy (Strategy) which was released in 2008. Along with the Strategy, the Department also released the Environmental Justice Five-Year Implementation Plan, and this year its Environmental Justice Five-Year Implementation Plan Third and Fourth Annual Progress Reports. The Strategy is a 5-year plan which commits the Department to the following goals: Identify and address programs, policies, and activities of the Department that may have disproportionately high and adverse human health or environmental effects on minority, low-income, and tribal populations. Enhance the credibility and public trust of the Department by

398

Council on Environmental Quality (CEQ)  

Energy.gov (U.S. Department of Energy (DOE))

Congress established the Council on Environmental Quality within the Executive Office of the President as part of the National Environmental Policy Act of 1969 (NEPA). In enacting NEPA, Congress...

399

The costs of environmental protection  

E-Print Network (OSTI)

Recently, some have argued that tougher environmental policies can create jobs, stimulate innovation, and enhance competitiveness. On this view, economic side effects make environmental protection a sort of green free ...

Schmalensee, Richard

1993-01-01T23:59:59.000Z

400

Reactor operation environmental information document  

Science Conference Proceedings (OSTI)

This volume is a reactor operation environmental information document for the Savannah River Plant. Topics include meteorology, surface hydrology, transport, environmental impacts, and radiation effects. 48 figs., 56 tabs. (KD)

Bauer, L.R.; Hayes, D.W.; Hunter, C.H.; Marter, W.L.; Moyer, R.A.

1989-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Hanford Site 1998 Environmental Report  

Science Conference Proceedings (OSTI)

This Hanford Site environmental report is prepared annually to summarize environmental data and information, to describe environmental management performance, to demonstrate the status of compliance with environmental regulations, and to highlight major environmental programs and efforts. The report is written to meet requirements and guidelines of the U.S. Department of Energy (DOE) and to meet the needs of the public. This summary has been written with a minimum of technical terminology. Individual sections of the report are designed to: describe the Hanford Site and its mission; summarize the status of compliance with environmental regulations; describe the environmental programs at the Hanford Site; discuss the estimated radionuclide exposure to the public from 1998 Hanford Site activities; present the effluent monitoring, environmental surveillance, and groundwater protection and monitoring information; and discuss the activities to ensure quality.

RL Dirkes; RW Hanf; TM Poston

1999-09-21T23:59:59.000Z

402

Hanford Site Environmental Report 1993  

Science Conference Proceedings (OSTI)

The Hanford Site Environmental Report is prepared annually to summarize environmental data and information, describe environmental management performance, and demonstrate the status of compliance with environmental regulations. The report also highlights major environmental programs and efforts. The report is written to meet reporting requirements and Guidelines of the U.S. Department of Energy (DOE) an to meet the needs of the public. This summary has been written with a minimum of technical terminology. Individual sections of the report are designed to (a) describe the Hanford Site and its mission, (b) summarize the status in 1993 of compliance with environmental regulations, (c) describe the environmental programs at the Hanford Site, (d) discuss estimated radionuclide exposure to the public from 1993 Hanford activities, (e) present information on effluent monitoring and environmental surveillance, including ground-water protection and monitoring, (f) discuss activities to ensure quality. More detailed information can be found in the body of the report, the appendixes, and the cited references.

Dirkes, R.L.; Hanf, R.W.; Woodruff, R.K. [eds.

1994-06-01T23:59:59.000Z

403

Hanford Site Environmental Report 1999  

Science Conference Proceedings (OSTI)

This Hanford Site environmental report is prepared annually to summarize environmental data and information, to describe environmental management performance, to demonstrate the status of compliance with environmental regulations, and to highlight major environmental programs and efforts. The report is written to meet requirements and guidelines of the U.S. Department of Energy (DOE) and to meet the needs of the public. This summary has been written with a minimum of technical terminology. Individual sections of the report are designed to: (1) describe the Hanford Site and its mission; (2) summarize the status of compliance with environmental regulations; (3) describe the environmental programs at the Hanford Site; (4) discuss the estimated radionuclide exposure to the public from 1999 Hanford Site activities; (5) present the effluent monitoring, environmental surveillance, groundwater protection and monitoring information; and (6) discuss the activities to ensure quality.

TM Poston; RW Hanf; RL Dirkes

2000-09-28T23:59:59.000Z

404

Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 Cover photos courtesy of (left to right): Southeast Renewable Fuels, LLC DOE National Renewable Energy Laboratory Public domain Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) COOPERATING AGENCY: The U.S. Department of Agriculture-Rural Development is a cooperating

405

DOEM-1123 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEM-1123 DOEM-1123 Environmental Assessment Transfer of Normal and Low-Enriched Uranium Billets to the United Kingdom, Hanford Site, Richland, Washin%E E ~ U.S. Department of Energy Richland, Washington November 1995 DOE/EA - 1 123 ENVIRONMENTAL ASSESSMENT TRANSFER OF NORMAL AND LOW-ENRICHED URANIUM BILLETS TO THE UNITED KINGDOM HANFORD SITE, RICHLAND, WASHINGTON U.S. DEPARTMENT OF ENERGY NOVEMBER 1995 This page intentionally left blank. U.S. Department of Energy Glossary Glossary Acronyms and Ini ti a1 isms ALARA BNFL CERL CFR CY DOE DOH DOT EA FR IAEA IMO I so LCF LEU LSA NAC NCRP NEA , NEPA PNL rem WAC WHC As Low As Reasonably Achievable British Nuclear Fuels Limited, Inc. Construction Engineering Resources Laboratory Code o f Federal Regulations Calendar Year

406

BNL | Environmental Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Technology Environmental Technology Meteorological Services (Met Services) is responsible for the maintenance, calibration, data collection and data archiving for the weather instrumentation network associated with atmospheric dispersion concerns for BNL. This includes measuring wind speed, wind direction, temperature, rainfall, barometric pressure and relative humidity. Wind speed, wind direction and temperature are measured at 85 meters, 50 meters and at 10 meters. Rainfall, relative humidity and barometric pressure are taken at the 2 meter height. The 85-meter (280-ft.) meteorological tower, placed in operation in May 1981, is located in an open field west of the majority of the Brookhaven building complex at latitude 40052.20'N and longitude 72°53.35'W and its base is 24 m (80 ft.) above sea level.

407

SRS - 2006 Environmental Bulletins  

NLE Websites -- All DOE Office Websites (Extended Search)

6 Environmental Bulletins 6 Environmental Bulletins All documents in PDF and require Adobe Acrobat Reader December 1, 2006 Volume 17; Number 24 November 24, 2006 Volume 17; Number 23 November 15, 2006 Volume 17; Number 22 November 3, 2006 Volume 17; Number 21 October 16, 2006 Volume 17; Number 20 September 18, 2006 Volume 17; Number 19 August 23, 2006 Volume 17; Number 18 August 28, 2006 Volume 17; Number 17 August 23, 2006 Volume 17; Number 16 August 16, 2006 Volume 17; Number 15 July 28, 2006 Volume 17; Number 14 June 30, 2006 Volume 17; Number 13 June 15, 2006 Volume 17; Number 12 June 14, 2006 Volume 17; Number 11 June 2, 2006 Volume 17; Number 10 May 18, 2006 Volume 17; Number 9 April 5, 2006 Volume 17; Number 8 March 22, 2006 Volume 17; Number 7 March 6, 2006 Volume 17; Number 6

408

DOEEA-0984 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0984 0984 Environmental Assessment Environmental Assessment for the Deactivation of the N Reactor Facilities U.S. Department of Energy Richland, Washington May 1995 \ lR4DEMARK DISCLAIMER Reference herein to any specific wmmercial product, process. M m M c e by trade name, uademark, manufacturer. or otherwise, does not necessariiy collbuNte M imply ~ f s endorsement, rewmmendation. or favoring by the Unrted States Government or any agency thereof or I u Contractors M subcontractors Ths repon has been reproduced from the best available copy Available m peper copy and microfiche Available to and contract~s from Office of Scienufic and Technical Information P O Box62 Oak hdge, TN 37831 161 51 576-8401 Available to the public from the U S Department of Commerce

409

Environmental Groundwater Monitoring Report  

Office of Legacy Management (LM)

-460 -460 Environmental Groundwater Monitoring Report Third Quarter, 1997 October 1997 Approved for public release; further dissemination unlimited. Environmental Restoration U.S. Department of Energy Nevada Operations Office This report has been reproduced directly from the best available copy. 1 - I : ~vailablk to DOE and DOE contractors from the. Office of Scientific - and Technical .Information, P.O. Box 62, Oak Ridge, TN 3783 1 ; prices available from (423) 576-840 1. Available to the public from the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Rd., Springfield, VA 22 16 1, telephone (703) 487-4650. RULISON SITE GROUNDWATER MONITORING REPORT THIRD QUARTER, 1997 DOE Nevada Operations Office Las Vegas, Nevada

410

SRS - 2007 Environmental Bulletins  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Environmental Bulletins 7 Environmental Bulletins All documents in PDF and require Adobe Acrobat Reader December 31, 2007 Volume 18; Number 31 December 13, 2007 Volume 18; Number 30 December 7, 2007 Volume 18; Number 29 November 19, 2007 Volume 18; Number 28 November 14, 2007 Volume 18; Number 27 October 10, 2007 Volume 18; Number 26 October 4, 2007 Volume 18; Number 25 October 1, 2007 Volume 18; Number 24 September 11, 2007 Volume 18; Number 23 September 7, 2007 Volume 18; Number 22 August 16, 2007 Volume 18; Number 21 August 14, 2007 Volume 18; Number 20 August 8, 2007 Volume 18; Number 19 August 2, 2007 Volume 18; Number 18 June 28, 2007 Volume 18; Number 17 June 12, 2007 Volume 18; Number 16 June 6, 2007 Volume 18; Number 15 May 30, 2007 Volume 18; Number 14 May 9, 2007 Volume 18; Number 13

411

SRS - Environmental Bulletins  

NLE Websites -- All DOE Office Websites (Extended Search)

enterprise.srs - Nuclear Knowledge for the Nation enterprise.srs - Nuclear Knowledge for the Nation 11/11/2013 SEARCH GO SRS Home National Environmental Policy Act Documents (NEPA) NEPA Information and Resources DOE Office of NEPA Policy and Compliance Information about current DOE NEPA events, an electronic archive of DOE NEPA documents, and other resources for NEPA practitioners and members of the public. Public Comment Opportunities Information about how to comment on DOE NEPA projects with open comment periods. NEPA Document Status & Schedules Subscribe to NEPA update notices via email Categorical Exclusion (CX) Determination Forms SRS Specific NEPA Documents DOCUMENT NUMBER TITLE DATE OPEN FOR COMMENT DOE EIS-0220- SA-1 Supplement Analysis Interim Management of Nuclear Materials Final Environmental Impact 09/25/2009 Final Document

412

SRS - 2008 Environmental Bulletins  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Environmental Bulletins 8 Environmental Bulletins All documents in PDF and require Adobe Acrobat Reader December 18, 2008 Volume 19; Number 26 December 15, 2008 Volume 19; Number 25 December 10, 2008 Volume 19; Number 24 December 2, 2008 Volume 19; Number 23 November 20, 2008 Volume 19; Number 22 November 17, 2008 Volume 19; Number 21 October 9, 2008 Volume 19; Number 20 October 6, 2008 Volume 19; Number 19 August 18, 2008 Volume 19; Number 18 August 4, 2008 Volume 19; Number 17 July 15, 2008 Volume 19; Number 16 July 9, 2008 Volume 19; Number 15 June 24, 2008 Volume 19; Number 14 June 16, 2008 Volume 19; Number 13 June 4, 2008 Volume 19; Number 12 May 13, 2008 Volume 19; Number 11 April 24, 2008 Volume 19; Number 10 March 20, 2008 Volume 19; Number 9 March 13, 2008 Volume 19; Number 8

413

National Environmental Policy Act  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Policy Act Environmental Policy Act to. # LM-24-10 Legacy Management Project/Activity: Abandon four monitoring wells associated with the Rocky Flats, CO~ Site. A. Brief Projecti Activity Description The U.S. Department of Energy (DOE) Office of Legacy Management (LM) proposes to abandon four groundwater monitoring wells that were installed in the 1990s near the Rocky Flats, Colorado, Site. Three of the wells are adjacent to the Great Western Reservoir, and one is adjacent to Standley Lake; the attached map shows the well locations. Wells 11994~ 11894; and 49192 are in the city of Broomfield, and well 49292 is in the city of Westminster. The wells are no longer needed for groundwater monitoring purposes and are scheduled to be abandoned before the end of 20 1 0 and in accordance with regulations

414

MOUND Environmental Restoration Program  

Office of Legacy Management (LM)

MOUND MOUND Environmental Restoration Program ._. I s ! I " ' Al /. i i : MOUND Environmental Restoration Program VlOUND I MOUND PLANT POTENTIAL RELEASE SITE PACKAGE Notice of Public Review Period hgram The following potential release site (PRS) packages will be available for public review ir he CERCLA Public Reading Room, 305 E. Central Ave., Miamisburg, Ohio beginning lune 17, 1997. Public comment will be accepted on these packages from June 17, 1997, .hrough July 18, 1997. PRS 30: Building 27 Propane Tank PRS 129/130: Former Solvent Storage Sites PRS 241: Soil Con@mination- - Main Hill Parking Lot Area PRS 307: Soil Contamination -.Buil.ding 29 PRS 318: PCB Tramformer and Capacitor Locations PRS 320-325: Former Sites -:Dayton Uqits 1-4/Dayton WarehousYScioto Facility

415

SRS - 2004 Environmental Bulletins  

NLE Websites -- All DOE Office Websites (Extended Search)

4 Environmental Bulletins 4 Environmental Bulletins All documents in PDF and require Adobe Acrobat Reader January 7, 2004 Volume 15; Number 1 January 8, 2004 Volume 15; Number 2 February 5. 2004 Volume 15; Number 3 February 11, 2004 Volume 15; Number 4 February 23, 2004 Volume 15; Number 5 February 27, 2004 Volume 15; Number 6 March 17, 2004 Volume 15; Number 7 March 18, 2004 Volume 15; Number 8 April 5, 2004 Volume 15; Number 9 April 7, 2004 Volume 15; Number 10 April 19, 2004 Volume 15; Number 11 April 30, 2004 Volume 15; Number 12 June 1, 2004 Volume 15; Number 13 June 14, 2004 Volume 15; Number 14 June 22, 2004 Volume 15; Number 15 July 13, 2004 Volume 15; Number 16 August 9, 2004 Volume 15; Number 17 August 23, 2004 Volume 15; Number 18 September 1, 2004 Volume 15; Number 19

416

National Environmental Policy Act  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Policy Act (NEPA) Environmental Policy Act (NEPA) Public inquiries should be directed to: Gary S. Hartman DOE ORO NEPA Compliance Officer P.O. Box 2001, SE-32 Oak Ridge, TN 37831 (865) 576-0273 hartmangs@oro.doe.gov *Categorical Exclusion Determination Documents (CX Determinations): Date Title Reference No. Program 02/01/2010 Receipt and Processing of TRU Soils from Nuclear Fuel Services (NFS) in Erwin, Tennessee by the Transuranic (TRU) Waste Processing Center (TWPC) on the Oak Ridge Reservation, Tennessee CX-TWPC-09-0001 EM 02/01/2010 Conducting Macroencapsulation Treatment in the Parking Lot of the Contact Handled Marshalling Building (CHMB) at the TRU Waste Processing Center (TWPC) on the Oak Ridge Reservation, Tennessee CX-TWPC-09-0003 EM 03/02/2010 East Campus Parking Structure at the Oak Ridge National Laboratory (ORNL)

417

Indoor Environmental Quality  

NLE Websites -- All DOE Office Websites (Extended Search)

office interior, people talking, computational fluid dynamics image office interior, people talking, computational fluid dynamics image Indoor Environmental Quality EETD conducts a broad program of research, technology development, and dissemination activities directed toward improving the health, comfort, and energy efficiency of the indoor environment. EETD researchers conduct a broad program of research and development with the goals of: reducing the energy used for thermally conditioning and distributing ventilation air in buildings improving indoor air quality (IAQ), thermal comfort and the health and productivity of building occupants understanding human exposures to environmental pollutants found in indoor and outdoor air improving the scientific understanding of factors and processes affecting air quality developing sound science to inform public policy on the most

418

SRS - Environmental Bulletins  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Environmental Bulletins 1 Environmental Bulletins All documents in PDF and require Adobe Acrobat Reader December 26, 2011 Volume 23; Number 31 November 14, 2011 Volume 23; Number 30 October 31, 2011 Volume 23; Number 29 October 25, 2011 Volume 23; Number 28 October 21, 2011 Volume 23; Number 27 September 26, 2011 Volume 23; Number 26 September 22, 2011 Volume 23; Number 25 September 14, 2011 Volume 23; Number 24 September 12, 2011 Volume 23; Number 23 August 29, 2011 Volume 23; Number 22 August 29, 2011 Volume 23; Number 21 August 03, 2011 Volume 23; Number 20 June 27, 2011 Volume 23; Number 19 June 23, 2011 Volume 23; Number 18 June 20, 2011 Volume 23; Number 17 May 25, 2011 Volume 23; Number 16 May 19, 2011 Volume 23; Number 15 April 20, 2011 Volume 23; Number 14 April 15, 2011 Volume 23; Number 13

419

SRS - 2003 Environmental Bulletins  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Environmental Bulletins 3 Environmental Bulletins All documents in PDF and require Adobe Acrobat Reader January 22, 2003 Volume 14; Number 1 February 6, 2003 Volume 14; Number 2 February 7, 2003 Volume 14; Number 3 February 10, 2003 Volume 14; Number 4 February 17, 2003 Volume 14; Number 5 March 10, 2003 Volume 14; Number 6 April 7, 2003 Volume 14, Number 7 April 28, 2003 Volume 14, Number 8 May 9, 2003 Volume 14; Number 9 May 14, 2003 Volume 14, Number 10 June 9, 2003 Volume 14, Number 11 June 24, 2003 Volume 14, Number 13 June 25, 2003 Volume 14, Number 14 July 21, 2003 Volume 14; Number 17 July 21, 2003 Volume 14; Number 18 August 8, 2003 Volume 14; Number 19 August 7, 2003 Volume 14; Number 20 August 11, 2003 Volume 14; Number 21 August 28, 2003 Volume 14; Number 22 September 4, 2003 Volume 14; Number 23

420

SRS - 2002 Environmental Bulletins  

NLE Websites -- All DOE Office Websites (Extended Search)

2 Environmental Bulletins 2 Environmental Bulletins All documents in PDF and require Adobe Acrobat Reader January 15, 2002 Volume 13; Number 1 February 7, 2002 Volume 13; Number 2 February 28, 2002 Volume 13; Number 3 March 4, 2002 Volume 13; Number 4 March 6, 2002 Volume 13; Number 5 April 5, 2002 Volume 13; Number 6 April 10, 2002 Volume 13; Number 7 April 18, 2002 Volume 13; Number 8 June 7, 2002 Volume 13; Number 9 June 10, 2002 Volume 13; Number 10 June 18, 2002 Volume 13; Number 11 July 8, 2002 Volume 13; Number 12 September 4, 2002 Volume 13; Number 14 September 25, 2002 Volume 13; Number 15 October 7, 2002 Volume 13; Number 16 October 25, 2002 Volume 13; Number 17 November15, 2002 Volume 13; Number 18 December 5, 2002 Volume 13; Number 19 December 16, 2002 Volume 13; Number 20

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

1982 environmental monitoring report  

SciTech Connect

The environmental levels of radioactivity and other pollutants found in the vicinity of BNL during 1982 are summarized in this report. As an aid in the interpretation of the data, the amounts of radioactivity and other pollutants released in airborne and liquid effluents from Laboratory facilities to the environment are also indicated. The environmental data include external radiation levels; radioactive air particulates; tritium concentrations; the amounts and concentrations of radioactivity in and the water quality of the stream into which liquid effluents are released; the concentrations of radioactivity in biota from the stream; the concentrations of radioactivity in and the water quality of ground waters underlying the Laboratory; and concentrations of radioactivity in milk samples obtained in the vicinity of the Laboratory. 30 references, 9 figures, 18 tables.

Day, L.E.; Naidu, J.R. (eds.)

1983-04-01T23:59:59.000Z

422

1981 environmental monitoring report  

SciTech Connect

The environmental levels of radioactivity and other pollutants found in the vicinity of BNL during 1981 are summarized in this report. As an aid in the interpretation of the data, the amounts of radioactivity and other pollutants released in airborne and liquid effluents from Laboratory facilities to the environment are also indicated. The environmental data includes external radiation levels; radioactive air particulates; tritium and iodine concentrations; the amounts and concentrations of radioactivity in and the water quality of the stream into which liquid effluents are released; the concentrations of radioactivity in sediments and biota from the stream; the concentrations of radioactivity in and the water quality of ground waters underlying the Laboratory; and concentrations of radioactivity in milk samples obtained in the vicinity of the Laboratory. 28 references, 9 figures, 20 tables.

Naidu, J.R.; Olmer, L.L. (eds.)

1982-04-01T23:59:59.000Z

423

Surface Environmental Surveillance Procedures Manual  

SciTech Connect

Environmental surveillance data are used in assessing the impact of current and past site operations on human health and the environment, demonstrating compliance with applicable local, state, and federal environmental regulations, and verifying the adequacy of containment and effluent controls. SESP sampling schedules are reviewed, revised, and published each calendar year in the Hanford Site Environmental Surveillance Master Sampling Schedule. Environmental samples are collected by SESP staff in accordance with the approved sample collection procedures documented in this manual.

RW Hanf; TM Poston

2000-09-20T23:59:59.000Z

424

EA-1958: Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE))

Future Development in Proximity to the William R. Wiley Environmental Molecular Sciences Laboratory, Pacific Northwest National Laboratory, Richland, Washington

425

Managed Programs, Environmental Protection Division  

NLE Websites -- All DOE Office Websites (Extended Search)

training and supporting subject matter expertise. Environmental Information Management System: storing, managing, verifying, protecting, retrieving and archiving BNL's...

426

Hanford Environmental Dose Reconstruction Project  

SciTech Connect

The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates.

Finch, S.M.; McMakin, A.H. (comps.)

1991-01-01T23:59:59.000Z

427

Categorical Exclusion Determinations: Environmental Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Consolidated Business Service Center Categorical Exclusion Determinations: Environmental Management Consolidated Business Service Center Categorical Exclusion Determinations issued...

428

Environmental Impact | Browse Tree Results  

U.S. Energy Information Administration (EIA)

Environmental Impact. From climate change to biodiversity loss - documenting man's impact. CAB International. Home. Abstracts Database. News Articles. ...

429

Available Technologies: Electrochemical Environmental Cell ...  

Electrochemical Environmental Cell with Vertical, Aligned Electrodes for TEM IB-3330. ... Energy storage device / battery research and development;

430

EA-0429: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-0429: Final Environmental Assessment Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington This environmental...

431

National Environmental Policy Act (NEPA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Environmental Policy Act (NEPA) National Environmental Policy Act (NEPA) Calibration Facilities Ecosystem Management Team Environmental Justice Environmental Management...

432

Aligning National Environmental Policy Act Process with Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Aligning National Environmental Policy Act Process with Aligning National Environmental Policy Act Process with Environmental Management Systems Aligning National Environmental Policy Act Process with Environmental Management Systems Aligning National Environmental Policy Act Process with Environmental Management Systems (EMS) This is a guidebook for NEPA and EMS practitioners that identifies elements of an EMS that can improve NEPA implementation. Alignment of NEPA and EMS further enhances both NEPA's goals and the sustainability goals laid out in the Executive Order 13423: " to create and maintain conditions, under which humans and nature can exist in productive harmony, that permit fulfilling the social, economic, and other requirements of the present and future generations of Americans." CEQ NEPA & EMS Guide Overview

433

Aligning National Environmental Policy Act Process with Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Aligning National Environmental Policy Act Process with Aligning National Environmental Policy Act Process with Environmental Management Systems Aligning National Environmental Policy Act Process with Environmental Management Systems Aligning National Environmental Policy Act Process with Environmental Management Systems (EMS) This is a guidebook for NEPA and EMS practitioners that identifies elements of an EMS that can improve NEPA implementation. Alignment of NEPA and EMS further enhances both NEPA's goals and the sustainability goals laid out in the Executive Order 13423: " to create and maintain conditions, under which humans and nature can exist in productive harmony, that permit fulfilling the social, economic, and other requirements of the present and future generations of Americans." CEQ NEPA & EMS Guide Overview

434

Environmental Stewardship at Brookhaven National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

of the Lab's commitment to environmentally responsible operations, it established the BNL Environmental Management System (EMS). The Lab's EMS ensures that environmental issues are...

435

Environmental Risks of Depleted UF6 Disposal  

NLE Websites -- All DOE Office Websites (Extended Search)

Depleted UF6 Environmental Risks line line Storage Conversion Manufacturing Disposal Environmental Risks of Depleted UF6 Disposal A discussion of the environmental impacts...

436

SLAC National Accelerator Laboratory - Environmental Science  

NLE Websites -- All DOE Office Websites (Extended Search)

and Environmental Interface Science at SSRL Environmental Remediation Science at SSRL Science Focus Area: SSRL Environmental Remediation Program X-ray Science at SLAC...

437

Site environmental report for 2003, Volume 1  

E-Print Network (OSTI)

Department of Energy, Environmental Regulatory Guide forDepartment of Energy, Environmental Regulatory Guide forDepartment of Energy, Environmental Regulatory Guide for

Pauer, Ronald

2004-01-01T23:59:59.000Z

438

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL  

Office of Legacy Management (LM)

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community Improvement Corporation 720 Mound Road Miamisburg, Ohio 45342-6714 Dear Mr. Bird: The Core Team, consisting of the U.S. Department of Energy Miamisburg Environmental Management Project (DOE-MEMP), U.S. Environmental Protection Agency (USEPA), and the Ohio Environmental Protection Agency (OEPA), appreciates your comments on the Work

439

2011 ANNUAL SITE ENVIRONMENTAL REPORT  

SciTech Connect

The Savannah River Site Environmental Report for 2011 (SRNS-STI-2012-00200) is prepared for the U.S. Department of Energy (DOE) according to requirements of DOE Order 231.1 B, “Environment, Safety and Health Reporting." The annual SRS Environmental Report has been produced for more than 50 years. Several hundred copies are and interested individuals. The report’s purpose is to: present summary environmental data that characterize site environmental management performance; describe compliance status with respect to environmental standards and requirements; highlight significant programs and efforts.

Meyer, A.; Eddy, T.; Jannik, T.; Terry, B.; Cauthen, K.; Coward, L.; Dunaway-Ackerman, J.; Wilson, M.; Hutchison, J.; O'Quinn, S.

2012-10-01T23:59:59.000Z

440

Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)  

Science Conference Proceedings (OSTI)

This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

Not Available

1993-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Micro environmental sensing device  

DOE Patents (OSTI)

A microelectromechanical (MEM) acceleration switch is disclosed which includes a proof mass flexibly connected to a substrate, with the proof mass being moveable in a direction substantially perpendicular to the substrate in response to a sensed acceleration. An electrode on the proof mass contacts one or more electrodes located below the proof mass to provide a switch closure in response to the sensed acceleration. Electrical latching of the switch in the closed position is possible with an optional latching electrode. The MEM acceleration switch, which has applications for use as an environmental sensing device, can be fabricated using micromachining.

Polosky, Marc A. (Tijeras, NM); Lukens, Laurance L. (Tijeras, NM)

2006-05-02T23:59:59.000Z

442

Environmental Surveillance at Los Alamos during 1999  

E-Print Network (OSTI)

...................................................................................................................... 62 3. Environmental Radiological Dose Assessment ........................................ 63 Abstract

443

Environmental Surveillance at Los Alamos during 1997  

E-Print Network (OSTI)

...................................................................................................................... 44 3. Environmental Radiological Dose Assessment Highlights from 1997

444

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statements and Environmental Assessments Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the status of ongoing NEPA documents at the Department of Energy, including the dates of important milestones in the NEPA process and references to more information (updated monthly). This chart represents anticipated activity and is not a commitment for documentation or date. Last Revised: 12/19/2013 StatusChart_December2013revised.pdf More Documents & Publications 2013 Annual Planning Summary for the Western Area Power Administration 2012 Annual Planning Summary for Western Area Power Administration 2011 ANNUAL PLANNING SUMMARY FOR ADVANCED RESEARCH AND PROJECTS AGENCY WESTERN AREA POWER ADMINISTRATION

445

Office of Environmental Protection, Sustainability Support &...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Protection, Sustainability Support & Corporate Safety Analysis Office of Environmental Protection, Sustainability Support & Corporate Safety Analysis Organizational...

446

PIA - Environmental Management Consolidated Business Center ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marketing Administration Other Agencies You are here Home PIA - Environmental Management Consolidated Business Center (EMCBC) PIA - Environmental Management Consolidated...

447

Sandia National Laboratories: About Sandia: Environmental Responsibili...  

NLE Websites -- All DOE Office Websites (Extended Search)

Water Protection (SDWP) Storm Water Surface Dishcharge Terrestrial Surveillance Wastewater Discharge Site Contact Environmental Reports Environmental Reports The latest...

448

Sandia National Laboratories: About Sandia: Environmental Responsibili...  

NLE Websites -- All DOE Office Websites (Extended Search)

Contribution Programs Volunteer Programs Education Programs Environmental Responsibility Environmental Management System Pollution Prevention History Diversity Locations Missions...

449

Environmental Management Performance Measures, IG-0561 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Centers Field Sites Power Marketing Administration Other Agencies You are here Home Environmental Management Performance Measures, IG-0561 Environmental Management...

450

Environmental Restoration Strategic Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Plan Environmental Restoration Strategic Plan, remediating the Nuclear Weapons Complex, August 1995, environmentalrestorationstrategicplan.pdf Environmental...

451

Executive Order 13423- Strengthening Federal Environmental, Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

423- Strengthening Federal Environmental, Energy, and Transportation Management Executive Order 13423- Strengthening Federal Environmental, Energy, and Transportation Management It...

452

Mollusk Shell Nacre Ultrastructure Correlates with Environmental...  

NLE Websites -- All DOE Office Websites (Extended Search)

Mollusk Shell Nacre Ultrastructure Correlates with Environmental Temperature and Pressure Mollusk Shell Nacre Ultrastructure Correlates with Environmental Temperature and Pressure...

453

Environmental Statements, Availability, Etc., Programmatic Spent...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Environmental Statements, Availability, Etc.; Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste...

454

Office of Environmental Management | Department of Energy  

Office of Environmental Management (EM)

Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration Program Management Communication & Engagement...

455

Environmental Justice and Public Participation Through Technology...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Justice and Public Participation Through Technology- Building Community Capacity Environmental Justice and Public Participation Through Technology- Building Community...

456

Canadian Environmental Protection Act 2012 (Canada) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Canadian Environmental Protection Act 2012 (Canada) Canadian Environmental Protection Act 2012 (Canada) Eligibility Agricultural Commercial Construction Developer Fed. Government...

457

Environmental Assessment of Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 0 DOEEA-0930 Environmental Assessment of Facility Operations at the US. Department of Energy Grand Junction Projects Off ice, Grand Junction, Colorado June 1996 U S . Deparfment of Energy Grand Junction Projects Office Approved for public release; distribution is unlimited. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I U.S. DEPARTMENT OF ENERGY Finding of No Significant Impact, Facility Operations at the U . S . Department of Energy Grand Junction Projects Office, Grand Junction, Colorado AGENCY: U.S. Department of Energy ACTION Finding of No Sigdkant Impact SUMMARY: The U.S. Department of Energy (DOE) has prepared a sitewide o S T ~ environmental assessment (EA) @OE/EA-0930) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects office (GJPO) facility

458

Because Environmental Stewardship  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Stewardship Environmental Stewardship is everyone's responsibility Success of SNL/CA's EMS depends on you! Sandia/CA's EMS will only be successful through full integration into all aspects of site operations. You can participate in SNL/CA's success by considering environ- mental impacts when planning and performing your work. Here are a few simple ways you can support SNL/CA's EMS success: Sandia National Laboratories C a l i f o r n i a E n v i r o n m e n t a l M a n a g e m e n t S y s t e m The Basics  Consider using less toxic chemicals for laboratory activities  Minimize waste by purchasing only the amount of chemicals needed  Incorporate sustainable design principles into new and remodeled facilities  Recycle all office paper products  Minimize the use of once through potable water for

459

1983 environmental monitoring report  

Science Conference Proceedings (OSTI)

The environmental levels of radioactivity and other pollutants found in the vicinity of BNL during 1983 are summarized. The amounts of radioactivity and other pollutants released in airborne and liquid effluents from Laboratory facilities to the environment are also indicated. The environmental data includes external radiation levels; radioactivity of air particulates; tritium concentrations; the amounts and concentrations of radioactivity in and the water quality of the stream into which liquid effluents are released; the concentrations of radioactivity in biota from the stream; the concentrations of radioactivity in and the water quality of ground waters underlying the Laboratory; and concentrations of radioactivity in milk samples obtained in the vicinity of the Laboratory. The amounts of radioactivity released in airborne and liquid effluents from laboratory facilities to the environment were within allowable standards as stipulated in DOE Order 5480.1. Other pollutants, such as metals, organic compounds, etc., in the effluents released from the Laboratory were well below federal, state and local standards as applied to site specific conditions. 34 references, 9 figures, 17 tables.

Day, L.E.; Naidu, J.R. (eds.)

1984-06-01T23:59:59.000Z

460

Environmental issues in China  

Science Conference Proceedings (OSTI)

Global concern about the environment is increasing, and the People's Republic of China (PRC) is not immune from such concerns. The Chinese face issues similar to those of many other developing nations. The US Department of Energy is particularly interested in national and world pollution issues, especially those that may infringe on other countries' economic growth and development. The DOE is also interested in any opportunities that might exist for US technical assistance and equipment in combating environmental problems. Our studies of articles in the China Daily, and English-language daily newspaper published by the Chinese government, show that population, pollution, and energy are major concerns of the Chinese Communist Party. Thus this report emphasizes the official Chinese government view. Supporting data were also obtained from other sources. Regardless of the severity of their various environmental problems, the Chinese will only try to remedy those problems with the greatest negative effects on its developing economy. They will be looking for foreign assistance, financial and informational, to help implement solutions. With the Chinese government seeking assistance, the United States has an opportunity to export basic technical information, especially in the areas of pollution control and monitoring, oil exploration methods, oil drilling technology, water and sewage treatment procedures, hazardous waste and nuclear waste handling techniques, and nuclear power plant safety procedures. In those areas the US has expertise and extensive technical experience, and by exporting the technologies the US would benefit both economically and politically. 59 refs., 3 figs.

Travis, P.S.

1991-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Site environmental report for 1996  

Science Conference Proceedings (OSTI)

To help verify effective protection of public safety and preservation of the environment, Sandia National Laboratories (SNL)/California maintains an extensive, ongoing environmental monitoring program. This program monitors all significant airborne and liquid effluents and the environment at the SNL/California site perimeter. Lawrence Livermore National Laboratory (LLNL) performs off-site environmental monitoring for both sites. These monitoring efforts ensure that emission controls are effective in preventing contamination of the environment. As part of SNL/California`s Environmental Monitoring Program, an environmental surveillance system measures the possible presence of radioactive and hazardous materials in ambient air, surface water, groundwater, sewage, soil, vegetation, and locally produced food-stuffs. The program also includes an extensive environmental dosimetry program, which measures external radiation levels around the Livermore site and nearby vicinity. Each year, the results of the Environmental Monitoring Program are published in this report, the Site Environmental Report. This executive summary focuses on impacts to the environment and estimated radiation doses to the public from site emissions. Chapter 3, {open_quotes}Compliance Summary,{close_quotes} reviews the site`s various environmental protection activities and compliance status, with applicable environmental regulations. The effluent monitoring and environmental surveillance results for 1996 show that SNL/California operations had no harmful effects on the environment or the public. 37 figs., 12 tabs.

Holland, R.C.

1997-08-01T23:59:59.000Z

462

2002 WIPP Environmental Monitoring Plan  

SciTech Connect

DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

Washington TRU Solutions LLC

2002-09-30T23:59:59.000Z

463

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 23, 2009 September 23, 2009 EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas September 21, 2009 EIS-0435: Notice of Intent to Prepare an Environmental Impact Statement and Conduct a Scoping Meeting Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota September 15, 2009 EIS-0434: Notice of Intent To Prepare an Environmental Impact Statement and to Conduct Scoping Meetings Hualapai Valley Solar Interconnection Project in Mohave County, Arizona July 30, 2009 EIS-0425: Notice of Intent to Prepare an Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA

464

Sensors for environmental monitoring and long-term environmental stewardship.  

SciTech Connect

This report surveys the needs associated with environmental monitoring and long-term environmental stewardship. Emerging sensor technologies are reviewed to identify compatible technologies for various environmental monitoring applications. The contaminants that are considered in this report are grouped into the following categories: (1) metals, (2) radioisotopes, (3) volatile organic compounds, and (4) biological contaminants. Regulatory drivers are evaluated for different applications (e.g., drinking water, storm water, pretreatment, and air emissions), and sensor requirements are derived from these regulatory metrics. Sensor capabilities are then summarized according to contaminant type, and the applicability of the different sensors to various environmental monitoring applications is discussed.

Miller, David Russell; Robinson, Alex Lockwood; Ho, Clifford Kuofei; Davis, Mary Jo (Science Applications International Corporation, Albuquerque, NM)

2004-09-01T23:59:59.000Z

465

Environmental monitoring plan - environmental monitoring section. Revision 1  

Science Conference Proceedings (OSTI)

This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures.

Wilt, G.C. [ed.; Tate, P.J.; Brigdon, S.L. [and others

1994-11-01T23:59:59.000Z

466

Environmental Monitoring Plan, Revision 6  

SciTech Connect

The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting, which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 458.1, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies.

Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

2012-03-02T23:59:59.000Z

467

Long-Term Environmental Stewardship  

NLE Websites -- All DOE Office Websites (Extended Search)

Long-Term Environmental Stewardship Long-Term Environmental Stewardship The Long-Term Environmental Stewardship Program ensures protection of human health and the environment, following site remediations. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Continuing environmental commitment Long-term stewardship activities are designed to prevent exposures to residual contamination and waste including groundwater monitoring ongoing pump-and-treatment activities maintenance of barriers and other contaminant structures periodic inspections control of site access posted signs Long-term environmental stewardship (LTES) data access DOE requires that data used to make decisions concerning LTES conditions be readily accessible to the public. To accomplish this, sample analysis data

468

EA-1853: Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT DOE/EA-1853 PERRIN RANCH WIND ENERGY INTERCONNECTION PROJECT COCONINO COUNTY, ARIZONA Prepared for U.S. Department of Energy Western Area Power Administration Desert Southwest Region P.O. Box 6457 Phoenix, Arizona 85005 Prepared by SWCA Environmental Consultants 3033 North Central Avenue, Suite 145 Phoenix, Arizona 85012 (602) 274-3831 www.swca.com July 2011 July 2011 i CONTENTS EXECUTIVE SUMMARY ........................................................................................................................ 1 1. INTRODUCTION ................................................................................................................................ 1 1.1 BACKGROUND .......................................................................................................................... 1

469

Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6E/EIS-0096-F . Ji^ ' 6E/EIS-0096-F . Ji^ ' w V' - > DOE/EIS--00 96-F-Vol.1 //C^ DE84 0 0 1 4 4 6 Final Environmental Impact Statement Remedial Actions at the Former Vitro Rare Metals Plant Site, Canonsburg, Washington County, Pennsylvania United States Department of Energy July 1983 Volume I r NOTICE } IPORTIONS OF THIS REPORT ARE ILLEGIBLE.' / It has been reproduced from the besi ' available copy to permit the broadest possible availability. This document is PUBLICLY RELEASABLl Authorizmg OfFtciai Date: Z P l ^ o " ? isTWBUTim ef T H I S m\jM] IS mm\m DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal

470

DOEYEA-0856 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEYEA-0856 DOEYEA-0856 Environmental Assessment for Construction and Operation of a Human Genome Laboratory at Lawrence Berkeley Laboratory Berkeley, California December 1994 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsi- bility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Refer- ence herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recom-

471

journal Environmental Health Perspectives  

NLE Websites -- All DOE Office Websites (Extended Search)

Pollutant exposures from unvented gas cooking burners A simulation Pollutant exposures from unvented gas cooking burners A simulation based assessment for Southern California journal Environmental Health Perspectives year month abstract p Background Residential natural gas cooking burners NGCBs can emit substantial quantities of pollutants and they are typically used without venting p p Objective Quantify pollutant concentrations and occupant exposures resulting from NGCB use in California homes p p Methods A mass balance model was applied to estimate time dependent pollutant concentrations throughout homes and the exposure concentrations experienced by individual occupants The model was applied to estimate nitrogen dioxide NO2 carbon monoxide CO and formaldehyde HCHO concentrations for one week each in summer and winter for a representative sample

472

Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 1 - Chapters U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 Draft Cover photos courtesy of (left to right): Southeast Renewable Fuels, LLC DOE National Renewable Energy Laboratory Public domain Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 1 - Chapters U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 DOE/EIS-0407D COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) COOPERATING AGENCY: The U.S. Department of Agriculture-Rural Development is a cooperating

473

DOEIEA-1086 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

86 86 Environmental Assessment for Amendments to 10 CFR Part 835 DISCLAIMER Portions of this document may be illegible i n electronic image products. Images are produced f h m the best avaiIable original document. This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employes, makes any warranty, express or implied, or a s s u m e s any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any spc- cific commercial product, process, or senrice by trade name, trademark, manufac-

474

ENVIRONMENTAL COMPLIANCE (EC)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT (MG) MANAGEMENT (MG) OBJECTIVE MG.1: Functions, assignments, responsibilities, and reporting relationships (including those between the line operating organization and Environment, Safety, and Health support organizations) are clearly defined, understood, and effectively implemented, with line management responsible for safety. Personnel exhibit an awareness of public and worker safety, health, and environmental protection requirements and, through their actions, demonstrate a high priority commitment to comply with these requirements. (CR 1 and 2) CRITERIA 1. The WCRR has effectively implemented the organization and management responsibilities specified in TSR 5.2. (WCRRF TSR 5.2; DOE P 450.4, 10 CFR 851) 2. Implementation of TSR 5.2 includes accurate organizational documentation that is

475

DOEEA-1177 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Environmental Assessment SalvageDemolition of 200 West Area, 200 East Area and 300 Area Steam Plants, Hanford Site, Richland, Washington U.S. Department of Energy Richland, Washington October 1996 DOE/EA-1177 ENVIR0NMEN"AL ASSESSMENT' FOR THE SALVAGE/DEMOLITION OF 200 WEST AREA, '200 EAST AREA, AND 300 AREA STEAM PLANTS U . S . DEPARTMENT OF ENERGY RICHLAND, WASHINGTON OCTOBER 1996 DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available origid document. DOE/EA- 1177 U.S. Department o f Energy Preface Appendices. Additional information necessary t o support an understanding of the proposed action, a1 ternati ves , and potenti a1 impacts i s provided. Comments resul ti.ng from review o

476

Center for Environmental Biotechnology  

NLE Websites -- All DOE Office Websites (Extended Search)

Current Projects Hydroecological Engineering Advanced Decision Support (HEADS) The HEADS research group has established a strong track record in the rapidly growing, new subject area of Ecological Engineering. The term hydroecological engineering signifies the group's concentration on water resources and wastewater engineering. Recognizing the growth in the field of environmental informatics and the application of computer-based models in the development of decision support systems, the group is active in this niche area. Interest in decision support interfaces well with the group's expertise in the deployment of real-time flow and water quality sensors, rapid laboratory assessment techniques, and mathematical models to develop an early warning system for contaminant management and containment.

477

DOE's Offices of Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement of Intent (SOI) Statement of Intent (SOI) between the US Dept of Energy (DOE) and the UK Nuclear Decommissioning Authority (NDA) on decommissioning and waste management was renewed for a further five years during the Waste Management conference in Phoenix, AZ in March. The signatories to the SOI were the DOE's Offices of Environmental Management (EM) and Nuclear Energy (NE) and the NDA, with NE being a new addition to the arrangement. The Office of Environment Management is responsible for the clean-up of the former nuclear weapons' sites and the relationship between them and the NDA has already resulted in collaboration in a number of areas such as thermal treatments for stabilization of wastes, plutonium management, aging facilities management, non-standard fuels

478

Environmental Biology | Clean Energy | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

communities and the processes by which they transform materials and energy. Much of the funding for these studies is provided by DOE's Office of Biological and Environmental...

479

Environmental recordkeeping: The administrative record  

Science Conference Proceedings (OSTI)

This document provides information on an environmental records management system. It includes information on environmental recordkeeping; environmental regulations with emphasis on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); and the administrative record including a case study of the Hanford Site's administrative record system. This paper will focus on the following objectives: (1) Identify resources that can be used as reference tools; (2) understand the reasons for developing and maintaining an administrative record; and, (3) evaluate an existing system and identify means of complying with the regulations. 15 refs., 2 figs.

Sprouse, B.S.

1991-08-01T23:59:59.000Z

480

Lincoln Electric Draft Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

APPENDIX E. DRAFT EA COMMENTS AND RESPONSES 2 Lincoln Electric Draft Environmental Assessment Comments and Responses Number Commenter Comment Summary Response 1. Euclid Historical...

Note: This page contains sample records for the topic "abb abb environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Portable Chemical Sensors for Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemical Sensors for Environmental and State of Health Monitoring Emerging nano technologies are transforming microsensor research and development, a key enabler of Sandia's...

482

Environmental Protection | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

electricity use, water consumption and environmental emissions. Environment and Sustainability Argonne National Laboratory is helping our nation build an economy based on...

483

Green Engineering and Environmental Stewardship  

Science Conference Proceedings (OSTI)

Therefore, “green” or environmentally benign technology should be a focus for ... The other is to protect the global environment by preserving energy and ...

484

National Environmental Policy Act (NEPA)  

Energy.gov (U.S. Department of Energy (DOE))

All Electricity Delivery and Energy Reliability (OE) projects are reviewed under the National Environmental Policy Act (NEPA) of 1969 – 42 U.S.C. Section 4321 et seq.

485

Hanford Environmental Dose Reconstruction Project  

SciTech Connect

The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates.

Finch, S.M.; McMakin, A.H. (comps.)

1992-06-01T23:59:59.000Z

486

Environmental Energy Technologies Division News  

NLE Websites -- All DOE Office Websites (Extended Search)

Editor's Note: This special issue of EETD News examines the California energy crisis of 2001, and research and development underway at the Environmental Energy Technologies...

487

Environmental Policy | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

News Careers Work with ORNL About ORNL Fact Sheet Brochure Diversity Leadership Team Organization History Environmental Policy Corporate Giving Research Integrity Who we are,...

488

Environmental Information Management System (EIMS)  

NLE Websites -- All DOE Office Websites (Extended Search)

from BNL's environmental sampling programs. Applications are available to users to query, display, export and print data as well as several data management utilities,...

489

FAQS Reference Guide – Environmental Restoration  

Energy.gov (U.S. Department of Energy (DOE))

This reference guide addresses the competency statements in the November 2002 edition of DOE-STD-1157-2002, Environmental Restoration Functional Area Qualification Standard.

490

FAQS Reference Guide – Environmental Compliance  

Energy.gov (U.S. Department of Energy (DOE))

This reference guide addresses the competency statements in the June 2011 edition of DOE-STD-1156-2011, Environmental Compliance Functional Area Qualification Standard.

491

Renewable Hydrogen: The Environmental Perspective  

NLE Websites -- All DOE Office Websites (Extended Search)

The Environmental Perspective Tyson Eckerle Energy Independence Now Delivering Renewable Hydrogen Workshop November 16 th , 2009. Energy Independence Now Why are we here?...

492

Biological & Environmental Research Abstracts Database  

Office of Scientific and Technical Information (OSTI)

and Environmental Research Abstracts Database. Please logon. Logon Name: Password: Logon CommentsEmail Us * SecurityDisclaimer Notices * BER Abstracts Last Updated: September 27...

493

Environmental Protection Agency | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Protection Agency Environmental Protection Agency Environmental Protection Agency Selected documents prepared by the Environmental Protection Agency that provide guidance on the NEPA process August 24, 2012 EPA -- Amended Environmental Impact Statement Filing System Guidance Amended Environmental Impact Statement Filing System Guidance for Implementing 40 CFR 1506.9 and 1506.10 of the Council on Environmental Quality's Regulations Implementing the National Environmental Policy Act August 1, 2012 EPA -- Addressing Children's Health through Reviews Conducted Pursuant to the National Environmental Policy Act and Section 309 of the Clean Air Act Addressing Children's Health through Reviews Conducted Pursuant to the National Environmental Policy Act and Section 309 of the Clean Air Act

494

Environmental Compliance 2-1 2. Environmental Compliance  

E-Print Network (OSTI)

operate under leasing arrangements at the ETTP under the DOE Rein- dustrialization Program. LesseesEnvironmental Compliance 2-1 2. Environmental Compliance It is DOE-ORO and National Nuclear, executive orders, DOE orders (as incorporated into the op- erating contracts), and best management practices

Pennycook, Steve

495

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 3, 2011 June 3, 2011 EIS-0435: EPA Notice of Availability of the Final Environmental Impact Statement Groton Generation Station Interconnection Agreement, Brown County, South Dakota May 23, 2011 EIS-0460: Notice of Intent to Prepare an Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois May 20, 2011 EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho May 20, 2011 EIS-0471: Notice of Adoption of an Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho May 20, 2011 EIS-0468: EPA Notice of Availability of the Final Environmental Impact Statement American Centrifuge Plant, Piketon, OH April 29, 2011 EIS-0350-S1: EPA Notice of Availability of the Draft Supplemental

496

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 28, 2010 May 28, 2010 EIS-0419: EPA Notice of Availability of the Draft Environmental Impact Statement Whistling Ridge Energy Project, Construction and Operation of a 75-megawatt Wind Turbine Facility, City of White Salmon, Skamania County, WA May 13, 2010 EA-1707: Draft Environmental Assessment Closure of Nonradioactive Dangerous Waste Landfill and Solid Waste Landfill, Hanford Site, Richland, Washington April 9, 2010 EIS-0404: EPA Notice of Availability of the Final Environmental Impact Statement Los Vaqueros Reservoir Expansion Project, California April 9, 2010 EIS-0455: Draft Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA April 9, 2010 EIS-0455: EPA Notice of Availability of the Draft Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA

497

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 12, 2011 January 12, 2011 EIS-0407: Record of Decision Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas January 4, 2011 EIS-0450: Notice of Intent To Prepare an Environmental Impact Statement TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada December 17, 2010 EIS-0455: Notice of Adoption of an Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA December 17, 2010 EIS-0403: EPA Notice of Availability of the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States December 14, 2010 EIS-0459: Notice of Intent to Prepare a Programmatic Environmental Impact Statement Hawai'i Interisland Renewable Energy Program December 10, 2010 EIS-0421: Draft Environmental Impact Statement

498

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 8, 2007 November 8, 2007 EIS-0382: DOE Notice of Availability of the Draft Environmental Impact Statement Mesaba Energy Project, Itasca, Minnesota October 17, 2007 EIS-0402: Advance Notice of Intent to Prepare an Environmental Impact Statement Remediation of Area IV of the Santa Susana Field Laboratory August 10, 2007 EIS-0400: Notice of Intent to Prepare an Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO July 23, 2007 EIS-0375: Notice of Intent to Prepare an Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste August 31, 2006 EIS-0380: Notice to Extend Comment Period on the Draft Site-Wide Environmental Impact Statement Continued Operation of Los Alamos National Laboratory, Los Alamos, New

499

Energy, Environmental & Economic Systems Analysis  

E-Print Network (OSTI)

Market Simulations Opportunity Decision and Information Sciences Division Center for EnergyEnergy, Environmental & Economic Systems Analysis ENPEP-BALANCE: A Tool for Long-term Nuclear Power, Environmental & Economic Systems Analysis A resurgence of interest in nuclear energy is taking place

Kemner, Ken

500

1999 Environmental Monitoring Program Report  

SciTech Connect

This report describes the calendar year 1999 compliance monitoring and environmental surveillance activities of the Idaho National Engineering and Environmental Laboratory management and operating contractor Environmental Monitoring Program. This report includes results of sampling performed by the Drinking Water, Effluent, Storm Water, Groundwater Monitoring, and Environmental Surveillance Programs. This report compares the 1999 results to program-specific regulatory guidelines and past data to evaluate trends. The primary purposes of the monitoring and surveillance activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of public health and the environment. Surveillance of environmental media did not identify any previously unknown environmental problems or trends, which would indicate a loss of control or unplanned releases from facility operations. The Idaho National Engineering and Environmental Laboratory complied with permits and applicable regulations, with the expectation of nitrogen in two disposal pond effluent streams iron and total coliform bacteria in groundwater downgradient from one disposal well, and coliform bacteria in drinking water systems at two facilities. Maintenance activities were performed on the two drinking water systems and tested prior to putting back into service. The monitoring and surveillance results demonstrate that the public health and environment were protected.

L. V. Street

2000-09-01T23:59:59.000Z