Powered by Deep Web Technologies
Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Data:77783627-d5af-4901-aaf1-164d97736691 | Open Energy Information  

Open Energy Info (EERE)

-d5af-4901-aaf1-164d97736691 -d5af-4901-aaf1-164d97736691 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Cowlitz County Effective date: 2011/11/01 End date if known: Rate name: PRIVATE STREET AND AREA LIGHTING SCHEDULE 10 Sodium Vapor 200 watts Sector: Lighting Description: Applicable to street, roadway, and area lighting for residential and commercial property. SPECIAL CONDITIONS All lighting equipment, including mast arms, brackets, control equipment, transformers, wiring and supports, shall be owned, operated and maintained by the District. For new installations which do not utilize an existing District-owned pole and require the setting of a new pole for the light, the customer shall pay in advance $300 as an Aid-to- Construction. The District will require a Special Contract for service hereunder for a term of not less than sixty (60) consecutive months reflecting monthly payments computed in accordance with this Rate Schedule as it may be amended or superseded.

2

Data:825c2504-3839-49bf-aaf9-aa6655741203 | Open Energy Information  

Open Energy Info (EERE)

5c2504-3839-49bf-aaf9-aa6655741203 5c2504-3839-49bf-aaf9-aa6655741203 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indianapolis Power & Light Co Effective date: 2011/03/15 End date if known: Rate name: MU-1 - a1a - 150 watt HPS Sector: Lighting Description: Lamps in enclosed fixtures, suspended from mast arms on wood poles and supplied from overhead circuits. APPLICABILITY: For Street and Traffic Lighting of public streets, parkways, improved alleys, boulevards, drives, bridges, parking areas, or other public places by Cities or Towns or by individuals, groups of individuals, associations and other than incorporated municipalities; and lighting of public parks, drives, bridges, parking areas or other public places by only Cities or Towns where there is a prospect that the capital expenditure is warranted. The capital expenditure will be warranted if the amount of revenue received in sixty (60) months exceeds the estimated cost of installation for the lights as calculated by the Company. If the 60-month revenue does not exceed the cost of installation, the Customer must pay two and one-half (2½) times the difference of the cost of installation and the 60-month revenue prior to installation of the lighting. The terms, prices and provisions of this rate schedule shall be applicable to a consolidated city of the first class only to the extent not inconsistent with the specifications, terms, prices and provisions in contracts which may be entered into by such city pursuant to I.C. § 36-9-9-1, et. seq.

3

ARM - AAF Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Atmospheric Research The DOE ARM Aerial Facility Field Campaigns AAF Campaigns 2007 - UAV Campaigns 1993 - 2006, 2015 Other Aircraft Campaigns 1993 - 2010 AAF Contacts Rickey...

4

ARM - AAF Contacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Atmospheric Research The DOE ARM Aerial Facility Field Campaigns AAF Campaigns 2007 - UAV Campaigns 1993 - 2006, 2015 Other Aircraft Campaigns 1993 - 2010 AAF Contacts Rickey...

5

Data:87978379-5878-473a-9e17-aaf0f3c0890f | Open Energy Information  

Open Energy Info (EERE)

8379-5878-473a-9e17-aaf0f3c0890f 8379-5878-473a-9e17-aaf0f3c0890f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Small Power Service - More than 100kW -Primary Metering Discount Sector: Commercial Description: Application: This rate will be applied to customers for all types of service if their monthly Maximum Measured Demand is in excess of 100 kilowatts (kW) per month for three or more months in a consecutive 12-month period, unless the customer exceeds the application conditions of the large power time-of-day schedule.

6

Data:Ce81fdcf-0181-4f95-8509-ee44606aaf57 | Open Energy Information  

Open Energy Info (EERE)

fdcf-0181-4f95-8509-ee44606aaf57 fdcf-0181-4f95-8509-ee44606aaf57 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Albemarle Electric Member Corp Effective date: 2012/06/01 End date if known: Rate name: Irrigation TOD Sector: Industrial Description: * This schedule is applicable, on a voluntary basis, to seasonal farm irrigation service. Consumers taking service under this schedule must agree to be billed under this schedule for a minimum of twelve consecutive months. Single- or three-phase, 60-cycle alternating current, at an available secondary voltage mutually agreed upon between the Cooperative and the consumer.

7

Data:42aaf100-bcd8-4011-abd4-7ec38afe28ef | Open Energy Information  

Open Energy Info (EERE)

aaf100-bcd8-4011-abd4-7ec38afe28ef aaf100-bcd8-4011-abd4-7ec38afe28ef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: A & N Electric Coop Effective date: 2008/01/02 End date if known: Rate name: Former Delmarva Power Territory: Public Lighting Service-Outdoor Lighting-High Pressure Sodium-Customer Owned w/ Maintenance-400 W Sector: Lighting Description: Estimated Monthly Average Usage: 164kWh Additional Monthly Charges: Ornamental or Decorative Luminaires, $2.12 Poles Wood 25ft - 40 ft, $4.23 Fiberglass or Aluminum, Embedded, less than 25 ft, $4.23 Fiberglass or Aluminum, Embedded,25 ft- 35 ft, $8.47

8

Data:56d8118a-4aaf-4559-9875-fef52a123604 | Open Energy Information  

Open Energy Info (EERE)

118a-4aaf-4559-9875-fef52a123604 118a-4aaf-4559-9875-fef52a123604 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Rural Elec Coop Inc Effective date: 2011/02/01 End date if known: Rate name: Seasonal Budget Sector: Commercial Description: * SEASONAL BUDGET. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

9

Data:4aaf2dfa-3677-4ae1-951e-37755bca0008 | Open Energy Information  

Open Energy Info (EERE)

aaf2dfa-3677-4ae1-951e-37755bca0008 aaf2dfa-3677-4ae1-951e-37755bca0008 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: UNS Electric, Inc Effective date: 2011/07/01 End date if known: Rate name: C.A.R.E.S - M 601kWh - 1200 Sector: Residential Description: This C.A.R.E.S. pricing plan is available to those residential customers presently taking service under the Company's residential service pricing plan whose gross annual income is not more than one hundred fifty percent (150%) of the federal poverty level guideline effective at the time qualification and annual certification is sought. Customer Charge = Meter Services + Meter Reading + Billing & Collection + Customer Delivery

10

Data:744aaf2a-cdfa-44a4-825c-e9293009250e | Open Energy Information  

Open Energy Info (EERE)

aaf2a-cdfa-44a4-825c-e9293009250e aaf2a-cdfa-44a4-825c-e9293009250e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lodi, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Ms-1 Street and Area Lighting Service Overhead 55 W IND (100% contributed by the Municipality) Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0811 per kilowatt-hour.

11

Data:4893195a-2332-40df-8aaf-5e90e32f359a | Open Energy Information  

Open Energy Info (EERE)

93195a-2332-40df-8aaf-5e90e32f359a 93195a-2332-40df-8aaf-5e90e32f359a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bloomer Electric & Water Co Effective date: 1999/09/15 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: This rate will be applied to customers for all types of service, if their monthly Maximum Measured Demand is in excess of 200 kilowatts per month for three or more months in a consecutive 12-month period. Primary Metering Discount:Customers metered on the primary side of the transformer shall be given a 2% discount on the monthly energy charge, distribution demand and demand charge. The PCAC and the monthly customer charge will not be eligible for the primary metering discount.

12

Data:1aaf7784-3647-411c-af31-67f6a2567099 | Open Energy Information  

Open Energy Info (EERE)

aaf7784-3647-411c-af31-67f6a2567099 aaf7784-3647-411c-af31-67f6a2567099 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Residential Service - Optional Time-of-Day Three-Phase 7am-7pm Sector: Residential Description: This rate schedule is optional to all Rg-1, Residential Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule. Rg-2 Residential Service Optional TOD $1.00 per customer per month

13

Data:647858b6-9dd6-4214-9552-a1bccc44aaf1 | Open Energy Information  

Open Energy Info (EERE)

8b6-9dd6-4214-9552-a1bccc44aaf1 8b6-9dd6-4214-9552-a1bccc44aaf1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Johnson County Rural E M C Effective date: End date if known: Rate name: Net Metering Sevice Sector: Residential Description: Available in all territory served by the Corporation, in accordance with Corporate Service Rules and Regulations. Applicable to all consumers of the Corporation that meet all of the following conditions: 1. Own and operate a distributed generation ("DGen") facility that: a. Has a nameplate rating of not greater than 10 kW, b. Generates energy from a renewable energy source, and c. Is primarily intended to offset part or all of the consumer's electrical requirements 2. Have executed the Corporation's Interconnection Agreement Each net metering consumer subject to this Rate NMS shall be charged for electric service under that rate schedule which would otherwise be applicable if the consumer was not a net metering customer. In addition, each net metering consumer shall pay monthly Facilities Charge based on the total incremental cost of all facilities installed by the Corporation, including additional metering equipment, transformers, protective devices, controls and monitoring equipment times the Corporation's monthly Fixed Charge Rate. AND $5.00 per month Administrative Charge.

14

Data:4fea4549-9118-423a-af1d-f64ddcee4065 | Open Energy Information  

Open Energy Info (EERE)

fea4549-9118-423a-af1d-f64ddcee4065 fea4549-9118-423a-af1d-f64ddcee4065 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Black River Falls, Wisconsin (Utility Company) Effective date: 2010/04/15 End date if known: Rate name: General Service - Gs-1 Three Phase Sector: Commercial Description: Power Cost Adjustment Clause All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The current cost per kilowatt-hour of energy billed is equal to the cost of power purchased for the most recent month, divided by the kilowatt-hours of energy sold. The monthly adjustment (rounded to the nearest one one-hundredth of a cent) is equal to the current cost less the base cost. The base cost of power (U) is $0.0790 per kilowatt-hour. Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 50 kilowatts for three or more months in a consecutive 12-month period. Commitment to Community rider:Gs-1 General Service 3.0% of the total electric bill not to exceed $1.66

15

Data:8939e15e-fbe4-404b-aafe-94ca6f5e29fa | Open Energy Information  

Open Energy Info (EERE)

9e15e-fbe4-404b-aafe-94ca6f5e29fa 9e15e-fbe4-404b-aafe-94ca6f5e29fa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Wasco County PUD Effective date: 2013/04/01 End date if known: Rate name: COMMERCIAL PRIMARY SERVICE - Schedule 300 Sector: Commercial Description: PRIMARY SERVICE - Schedule 300 AVAILABLE: Throughout the District's service area in Wasco County. APPLICABLE: Electric service to three-phase customers taking delivery at primary voltage. CHARACTER OF SERVICE: Alternating current, sixty hertz, 2400, 4160/2400, 12470/7200, 69000, 115,000 volts. Source or reference: http://www.nwasco.com/commercial-rates.cfm

16

Data:0fed954c-4d54-4a4f-8f69-9f4aaf66d18b | Open Energy Information  

Open Energy Info (EERE)

fed954c-4d54-4a4f-8f69-9f4aaf66d18b fed954c-4d54-4a4f-8f69-9f4aaf66d18b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Randolph Electric Member Corp Effective date: 2013/04/01 End date if known: Rate name: L23 - 35 FT CLASS 6 Sector: Commercial Description: AVAILABILITY This schedule is available to individual members located on the Cooperative's distribution system. Mercury vapor lights are only available at existing locations. RATE - MONTHLY All night outdoor lighting service using overhead conductors and the Cooperative's standard lighting package equipment mounted on 30-foot Class 6, treated pine poles.

17

Data:F6da941f-6e27-468a-af81-afb4e26f9cb2 | Open Energy Information  

Open Energy Info (EERE)

41f-6e27-468a-af81-afb4e26f9cb2 41f-6e27-468a-af81-afb4e26f9cb2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Mississippi Elec Pwr Assn Effective date: 2012/12/01 End date if known: Rate name: LIGHTING--SCHEDULE LS--Rate SL 400 watt High Pressure Sodium Flood or Metal Halide Sector: Lighting Description: Availability A member must be receiving electric service to be eligible for a security light at that location. Character of Service Mercury Vapor, High Pressure Sodium Metal Halide light, or Sodium Edison III controlled by a photoelectric switch so as to provide light from sundown to sunup.

18

Data:44fae8c6-1aaf-4cad-a1c0-0a7ca7bc961d | Open Energy Information  

Open Energy Info (EERE)

c6-1aaf-4cad-a1c0-0a7ca7bc961d c6-1aaf-4cad-a1c0-0a7ca7bc961d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indiana Michigan Power Co (Michigan) Effective date: 2013/01/01 End date if known: Rate name: ECLS - 80 Watt LED Sector: Lighting Description: Energy Conversation Lighting Service Available for streetlighting service to municipalities, counties, and other governmental subdivisions. This rate is applicable for service that is supplied through new or rebuilt streetlight systems, including extension of streetlighting systems to additional locations where service is requested by customer.

19

Data:E843d4f9-0d5c-439c-9db8-3aaf91c1201f | Open Energy Information  

Open Energy Info (EERE)

-0d5c-439c-9db8-3aaf91c1201f -0d5c-439c-9db8-3aaf91c1201f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Williams - AZ, Arizona (Utility Company) Effective date: End date if known: Rate name: Customer owned Lights(4,000 Lumens-Pole) Sector: Lighting Description: Where customer installs, owns, operates, and maintains lighting facilities and City approves installation, operates and replaces lamps. Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

20

Data:51b0282a-ed0d-4465-91aa-f378570ebed7 | Open Energy Information  

Open Energy Info (EERE)

82a-ed0d-4465-91aa-f378570ebed7 82a-ed0d-4465-91aa-f378570ebed7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Warroad, Minnesota (Utility Company) Effective date: 2013/03/20 End date if known: 2014/03/20 Rate name: Residential service rate - Electric Heat Energy Uncontrolled Sector: Residential Description: Source or reference: http://mncable.net/~citysupt/RateSchedule.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Data:E5458704-08cc-45d8-aaf3-070a4d895db3 | Open Energy Information  

Open Energy Info (EERE)

4-08cc-45d8-aaf3-070a4d895db3 4-08cc-45d8-aaf3-070a4d895db3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Franklin Rural Electric Cooperative Effective date: 2010/05/01 End date if known: Rate name: Security Lights Sector: Lighting Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/199/Franklin%20Rural%20Electric%20Coop,%20IA.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

22

Data:541baf7c-aafe-44ad-99ea-803e835c4ab2 | Open Energy Information  

Open Energy Info (EERE)

c-aafe-44ad-99ea-803e835c4ab2 c-aafe-44ad-99ea-803e835c4ab2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1995/12/01 End date if known: Rate name: Commercial Service-Three-Phase, Schedule C-1 Sector: Commercial Description: Business, industrial and non-residential service such as schools, rural water districts, churches and public buildings, for all uses subject to the established rules and regulations of the Cooperative. Not available for irrigation uses. Subject to Power Cost Adjustment and Tax Adjustment Source or reference: Rates Binder B #4

23

Data:E3c311f0-892d-4881-a90d-aaf087239e6a | Open Energy Information  

Open Energy Info (EERE)

1f0-892d-4881-a90d-aaf087239e6a 1f0-892d-4881-a90d-aaf087239e6a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nebraska Public Power District Effective date: 2013/01/01 End date if known: Rate name: Directional Lighting HPS 250 W Metered 823 Sector: Lighting Description: To directional lighting of farmyards, backyards, patios, parking lots, storage yards, trailer courts, industrial sites, schools, churches, apartments, businesses, and many other applications where lighting is needed for identification, merchandising, environment, aesthetics, safety, protection, or convenience. Equipment Rental Charge means the district will install, own, operate, and maintain the lighting equipment.

24

Data:4c743d3e-6087-43b4-a914-ee1cc68aaf17 | Open Energy Information  

Open Energy Info (EERE)

e-6087-43b4-a914-ee1cc68aaf17 e-6087-43b4-a914-ee1cc68aaf17 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland Center, Wisconsin (Utility Company) Effective date: 2007/07/09 End date if known: Rate name: Gs-1 General Service Three Phase Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0582 per kilowatt-hour.

25

Data:Bcdfa73c-7aaf-4037-89c8-61a908aee559 | Open Energy Information  

Open Energy Info (EERE)

Bcdfa73c-7aaf-4037-89c8-61a908aee559 Bcdfa73c-7aaf-4037-89c8-61a908aee559 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sun River Electric Coop, Inc Effective date: End date if known: Rate name: Budget Irrigation - Single Phase Sector: Industrial Description: * Seasonal charge = $276.00 Fixed Monthly Charge = Seasonal charge / 12 $19/nameplate HP/season for all HP over 15 for three phase and all HP over 11 for single phase Source or reference: http://www.sunriverelectric.coop/Membership/Billing_Rates_and_Fees/Irrigation/index.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

26

Data:8088624d-db1e-48c8-8f0f-4331a5f56aaf | Open Energy Information  

Open Energy Info (EERE)

8088624d-db1e-48c8-8f0f-4331a5f56aaf 8088624d-db1e-48c8-8f0f-4331a5f56aaf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lighthouse Electric Coop, Inc Effective date: 2010/06/01 End date if known: Rate name: Residential-Single Phase Sector: Residential Description: This rate is applicable to the Power Cost Recovery Factor. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

27

Data:B3b80d17-067f-42e0-b16a-62813d9aaf35 | Open Energy Information  

Open Energy Info (EERE)

d17-067f-42e0-b16a-62813d9aaf35 d17-067f-42e0-b16a-62813d9aaf35 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Intermountain Rural Elec Assn Effective date: 2013/02/01 End date if known: Rate name: Interruptible Service Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

28

Data:1030f063-4b37-4b6e-87aa-f3467beae156 | Open Energy Information  

Open Energy Info (EERE)

0f063-4b37-4b6e-87aa-f3467beae156 0f063-4b37-4b6e-87aa-f3467beae156 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware Electric Cooperative Effective date: 2011/02/01 End date if known: Rate name: Lighting Service--Schedule L-1 Mercury Vapor Lamp-Roadway Luminaire (400w) Sector: Lighting Description: Available to Members, governments, agencies, public and private organizations desiring Electric Delivery or Electric Supply and Delivery Services through unmetered services for roadway and area lighting. Source or reference: http://www.delaware.coop/my-services/residential/billing/rates

29

Data:5b6b0cec-b508-4038-aaf3-39a1eec5b358 | Open Energy Information  

Open Energy Info (EERE)

cec-b508-4038-aaf3-39a1eec5b358 cec-b508-4038-aaf3-39a1eec5b358 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Elkhorn Rural Public Pwr Dist Effective date: 2013/01/01 End date if known: Rate name: RATE 24,25 Urban Commercial Electric Space Heating three phase Sector: Commercial Description: AVAILABLE: In the lease towns of Clearwater, Elgin and Ewing served by the District. APPLICABLE: To any commercial Customer when all of Customer's service at one location meets the following requirements. 1. Service is measured by one meter. 2. Electricity is the primary (greater than 50%) source of energy for space heating. 3. The Customer's average monthly KWH exceeds 4000 KWH.

30

Data:F78e3aaf-d43e-47fe-8a51-110a43dd7758 | Open Energy Information  

Open Energy Info (EERE)

aaf-d43e-47fe-8a51-110a43dd7758 aaf-d43e-47fe-8a51-110a43dd7758 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Elec & Gas Co Effective date: 2010/06/07 End date if known: Rate name: 150 JOURNL SQ20 GLOBAL TYPE V Sector: Commercial Description: Source or reference: http://www.pseg.com/family/pseandg/tariffs/electric/pdf/electric_tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

31

Data:6f0ecc7c-bfc6-4f2c-89d6-aaf13c377255 | Open Energy Information  

Open Energy Info (EERE)

ecc7c-bfc6-4f2c-89d6-aaf13c377255 ecc7c-bfc6-4f2c-89d6-aaf13c377255 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbia River Peoples Ut Dist Effective date: 2012/01/01 End date if known: Rate name: Residential Service - Special Waiver Sector: Residential Description: To residential service in single-family dwellings, single-family apartments, or single-family farms. Residential customers qualified as low income (150% of Federal Poverty Guidelines) will have the monthly Customer Charge waived. However, a minimum monthly charge may be specified in accordance with the PUD's line extension policy or credit and collection policy.

32

Data:6aaf3bd3-a593-4012-9a64-d50af6aae37b | Open Energy Information  

Open Energy Info (EERE)

aaf3bd3-a593-4012-9a64-d50af6aae37b aaf3bd3-a593-4012-9a64-d50af6aae37b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2008/04/15 End date if known: Rate name: 41 BP-AE-4 Bulk Power All Electric Sector: Description: Available to Consumers requiring a transformer capacity of 5000 kVA or more, subject to Association's established rules and regulations. This Bulk Power Service Rate applies to electric service measured by one meter used exclusively by one Consumer in a single establishment on one premise utilizing a single delivery point, and not resold or shared with others.

33

Data:E58a7943-c446-4f5f-ae74-091aa1aaf23a | Open Energy Information  

Open Energy Info (EERE)

943-c446-4f5f-ae74-091aa1aaf23a 943-c446-4f5f-ae74-091aa1aaf23a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bountiful, Utah (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: High Pressure Sodium 250w Post Top w/ Pole & Wire Sector: Lighting Description: This schedule is for electric service required for security area lighting and for security flood lighting where electric service is supplied from a BCLP overhead wood pole system, unless otherwise indicated. Source or reference: http://www.bountifulutah.gov/PowerMain.aspx Source Parent: Comments Applicability

34

Data:1ed235b7-663f-4c2a-af80-95bfe26b2091 | Open Energy Information  

Open Energy Info (EERE)

ed235b7-663f-4c2a-af80-95bfe26b2091 ed235b7-663f-4c2a-af80-95bfe26b2091 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Woodruff Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: Optional Residential Controlled Air Conditioning Service Sector: Description: Applicable to any customer who has a central air conditioning system with a connected compressor load of 3 kVA or more and agreeing to permit the Cooperative to install a control device is that the Cooperative can control the operation of the air conditioning compressor during periods of the Cooperative's peak load conditions and during emergency conditions.

35

Data:B537085d-40a6-464a-af0c-154db1a55be7 | Open Energy Information  

Open Energy Info (EERE)

d-40a6-464a-af0c-154db1a55be7 d-40a6-464a-af0c-154db1a55be7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stanhope, Iowa (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Commercial Rate #5 (Single Phase) Tiered Rate Sector: Commercial Description: there are two rates, composite and Tiered. Source or reference: See IRPS Binder "A" Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

36

Data:Bfd8bf22-1aaf-49de-9cd2-5bdc268b36d1 | Open Energy Information  

Open Energy Info (EERE)

Bfd8bf22-1aaf-49de-9cd2-5bdc268b36d1 Bfd8bf22-1aaf-49de-9cd2-5bdc268b36d1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Licking Rural Electric Inc Effective date: 2011/04/01 End date if known: Rate name: SAND QUARRYING SERVICE Sector: Commercial Description: Available to Consumers three-phase service, in all territory served by the Cooperative. All service is made available subject to the Cooperative's established Service Rules and Regulations, and subject also to a supplemental agreement for electric service, in which a contract demand will be specified, and which the Consumer will not exceed, except by mutual agreement with the Cooperative.

37

Data:2cd674d4-e828-4aaf-a090-f596ed7672d7 | Open Energy Information  

Open Energy Info (EERE)

d4-e828-4aaf-a090-f596ed7672d7 d4-e828-4aaf-a090-f596ed7672d7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1995/12/01 End date if known: Rate name: Commercial Pumping (Single Phase), Schedule CP-1 Sector: Commercial Description: Business, industrial and industrial pumping service. Not available for irrigation uses. Subject to Power Cost Adjustment and Tax Adjustment Source or reference: Rates Binder B #4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

38

Data:2432701e-0ac4-4b0a-afe3-905c4afc08c3 | Open Energy Information  

Open Energy Info (EERE)

e-0ac4-4b0a-afe3-905c4afc08c3 e-0ac4-4b0a-afe3-905c4afc08c3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: Schedule B - Small General Service - City of Fircrest - Unmetered Service Sector: Commercial Description: For Nonresidential lighting, heating, and incidental power uses where demand meter may be installed. Also for nonresidential incidental powers uses where a meter is not installed. Source or reference: www.mytpu.org/file_viewer.aspx?id=6167 Source Parent: Comments Applicability

39

Data:9c7214ef-4aaf-47b8-b0e0-e68efdc96bae | Open Energy Information  

Open Energy Info (EERE)

214ef-4aaf-47b8-b0e0-e68efdc96bae 214ef-4aaf-47b8-b0e0-e68efdc96bae No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Holy Cross Electric Assn, Inc Effective date: 2008/06/01 End date if known: Rate name: Residential Services - Farm and Home Sector: Residential Description: Available to Rural Residential (Rate Codes 01, 05, 08), Rural All Electric Residential (Rate Code 03), Town Residential (Rate Codes 21, 25, 28) Town All Electric Residential (Rate Code 23) separately metered Heat Only (Rate Code 29). This rate is for "residential use" for consumers served under a single meter. "Residential use" means electric use that is exclusively for domestic purposes (living spaces) but whose use may include service to water pumps, garages, barns or minor outbuildings provided they are served under the same domestic meter. Service under this tariff is subject to the established tariffs, rules and regulations of Holy Cross.

40

Data:Ecac9c5f-edc9-47a2-999a-af414e7cfbca | Open Energy Information  

Open Energy Info (EERE)

Ecac9c5f-edc9-47a2-999a-af414e7cfbca Ecac9c5f-edc9-47a2-999a-af414e7cfbca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bristol Virginia Utilities Effective date: 2013/08/01 End date if known: Rate name: General Power Rate - Schedule GSA3-(>1,000 kW and <2,500 kW) Sector: Industrial Description: Summer Billing Months are defined as June, July, August, and September. Winter Billing Months are defined as December, January, February, and March. Transition Billing Months are defined as April, May, October, and November Source or reference: http://www.bvu-optinet.com/data_elements/Electric_Rates.pdf

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Data:F4d2612d-9a1d-4625-9f53-047cd08aaf88 | Open Energy Information  

Open Energy Info (EERE)

d2612d-9a1d-4625-9f53-047cd08aaf88 d2612d-9a1d-4625-9f53-047cd08aaf88 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cumberland, Wisconsin (Utility Company) Effective date: 2006/03/15 End date if known: Rate name: Gs-1 General Service Three Phase less than 50kW Demand with Parallel Generation(20 kW or less)-Net Energy Billing Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0294per kilowatt-hour.

42

Data:240ac398-78fc-42b5-b60e-aaf9a8d9d0ba | Open Energy Information  

Open Energy Info (EERE)

98-78fc-42b5-b60e-aaf9a8d9d0ba 98-78fc-42b5-b60e-aaf9a8d9d0ba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Norcross, Georgia (Utility Company) Effective date: 2008/08/01 End date if known: Rate name: Green Power Rider Sector: Description: Green Power may be purchased in blocks of 100 kWh per month subject to the minimums specified below. Multiple blocks may be purchased. The cost of each block of Green Power purchased by the customer shall be added to the standard monthly bill of such customer. Each 100 kWh block = $3.00 per block Monthly Minimums: Residential: 1 block Small Business & Churches: 5 blocks

43

Data:20bd7d6a-af1d-4538-853c-1625eb313edb | Open Energy Information  

Open Energy Info (EERE)

bd7d6a-af1d-4538-853c-1625eb313edb bd7d6a-af1d-4538-853c-1625eb313edb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Lisbon, Wisconsin (Utility Company) Effective date: 2008/05/12 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 150 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0523 per kilowatt-hour.

44

Data:631ea316-9ca6-4923-a365-1f46aaf51182 | Open Energy Information  

Open Energy Info (EERE)

6-9ca6-4923-a365-1f46aaf51182 6-9ca6-4923-a365-1f46aaf51182 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Muscoda, Wisconsin (Utility Company) Effective date: 2010/10/26 End date if known: Rate name: Cp-2 Large Power Service Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0844 per kilowatt-hour.

45

Data:83a3a7eb-70e4-42ac-8db9-dd0423aaf7f4 | Open Energy Information  

Open Energy Info (EERE)

a7eb-70e4-42ac-8db9-dd0423aaf7f4 a7eb-70e4-42ac-8db9-dd0423aaf7f4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Cp-1 Small Power Service between 75kW and 200kW Demand Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

46

Data:85f477d2-ba02-4303-8e2e-c08aaf8cdcb2 | Open Energy Information  

Open Energy Info (EERE)

77d2-ba02-4303-8e2e-c08aaf8cdcb2 77d2-ba02-4303-8e2e-c08aaf8cdcb2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Wheatland, Wyoming (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: General Service- Single-Phase Sector: Commercial Description: To single-phase or three-phase general service adjacent to existing facilities of adequate capacity where the required transformer capacity does not exceed 50 kV A, within the service area of the Association subject to the rules and regulations of the Association and of Regulatory Authorities. Source or reference: http://psc.state.wy.us/htdocs/tariffs/wy_whe1/0001a.pdf

47

Data:87e2abd8-91a4-4091-91aa-f6454bd6e4ca | Open Energy Information  

Open Energy Info (EERE)

abd8-91a4-4091-91aa-f6454bd6e4ca abd8-91a4-4091-91aa-f6454bd6e4ca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hustisford Utilities Effective date: 2008/09/30 End date if known: Rate name: Cp-1 TOD Small Power Service between 50kW and 200kW Demand Optional Time-of-Day Service with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0720 per kilowatt-hour.

48

Data:57e3aaf2-2e42-4319-bc81-efa564c4f485 | Open Energy Information  

Open Energy Info (EERE)

aaf2-2e42-4319-bc81-efa564c4f485 aaf2-2e42-4319-bc81-efa564c4f485 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Lisbon, Wisconsin (Utility Company) Effective date: 2008/05/12 End date if known: Rate name: Cp-1 Small Power Service with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0523 per kilowatt-hour.

49

Data:Af6e1034-2b92-4666-80aa-f62d5a5b33c8 | Open Energy Information  

Open Energy Info (EERE)

34-2b92-4666-80aa-f62d5a5b33c8 34-2b92-4666-80aa-f62d5a5b33c8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hustisford Utilities Effective date: 2008/09/30 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand Time-of-Day Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0720 per kilowatt-hour.

50

Data:3afb299a-f590-437a-af7b-510d756d3879 | Open Energy Information  

Open Energy Info (EERE)

afb299a-f590-437a-af7b-510d756d3879 afb299a-f590-437a-af7b-510d756d3879 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wake Electric Membership Corp Effective date: 2012/01/01 End date if known: Rate name: NC GreenPower Sector: Description: * Flat rate buy = ($4.00 per block) / (100 kwh per block) NC GreenPower is an independent, nonprofit organization established to improve North Carolina's environment through voluntary contributions toward renewable energy. A landmark initiative approved by the N.C. Utilities Commission, NC GreenPower is the first statewide green energy program in the nation administered independently by a nonprofit organization and supported by all of the state's utilities. The program is designed to improve the environment by encouraging the development of renewable energy resources through consumers' voluntary contributions to NC GreenPower.For as little as $4 a month, you can help NC GreenPower build up the supply of green energy. Your $4 contribution each month will add one block of 100 kilowatt-hours of green power to the North Carolina power grid.

51

Data:D34602da-72a6-488e-8bd7-e36e9aaf6d04 | Open Energy Information  

Open Energy Info (EERE)

2a6-488e-8bd7-e36e9aaf6d04 2a6-488e-8bd7-e36e9aaf6d04 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Wisconsin (Utility Company) Effective date: 2006/02/01 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day 9am-9pm with Parallel Generation(20kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0549 per kWh. See schedule PCAC.

52

Data:D37676b6-8d61-4dea-aaf5-21993fca7f31 | Open Energy Information  

Open Energy Info (EERE)

b6-8d61-4dea-aaf5-21993fca7f31 b6-8d61-4dea-aaf5-21993fca7f31 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kerrville Public Utility Board Effective date: 2000/01/01 End date if known: Rate name: New Account charge-During normal business hours Sector: Commercial Description: Applicable to all retail customers served by KPUB. The charges listed herein are in addition to any other charges made under KPUB's Tariff for Electric Service, and will be applied for the appropriate condition described. Other services not covered by these standard conditions will be charged on the basis of an estimate for the job or the actual costs plus overhead adders.

53

Data:01c8da2a-623f-44d5-b306-974aaa18aaf9 | Open Energy Information  

Open Energy Info (EERE)

a-623f-44d5-b306-974aaa18aaf9 a-623f-44d5-b306-974aaa18aaf9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

54

Data:58b7c2b3-aaf1-41ca-90a7-152657a899ba | Open Energy Information  

Open Energy Info (EERE)

c2b3-aaf1-41ca-90a7-152657a899ba c2b3-aaf1-41ca-90a7-152657a899ba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Chelan County Effective date: 2012/04/01 End date if known: Rate name: Primary Power Service Schedules 3 Sector: Industrial Description: These schedules apply to Customers with average electrical loads from 0.4 annual average megawatts (aMWs) up to and including 5 annual aMWs at a single Point of Delivery. These rate schedules are available throughout the District's service area with the exception of the Stehekin area. Service under Schedule 3, 30, and 33 may require a power sales contract between the Customer and the District prior to connection of service.

55

Data:F42aaf65-83e1-48fb-8d0c-7968401337f7 | Open Energy Information  

Open Energy Info (EERE)

aaf65-83e1-48fb-8d0c-7968401337f7 aaf65-83e1-48fb-8d0c-7968401337f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Randolph Electric Member Corp Effective date: 2013/04/01 End date if known: Rate name: A23EE - SINGLE-PHASE ENERGY EFFICIENT HOME SERVICE Sector: Residential Description: * AVAILABILITY This schedule is available to all single-phase non-commercial consumers and whose all-electric homes meet the current standards as set forth by Randolph EMC as to energy efficiency. Energy efficient standards include but shall not be limited to: insulation R factors; attic ventilation; basement and crawl space ventilation; the use of storm windows and doors or windows and doors using thermal glass; proper caulking and sealing of windows and doors; load management switches on water heaters and air conditioners; and other energy efficient methods and equipment as deemed suitable by Randolph EMC. Individual motors served under this schedule shall not exceed ten horsepower. (Commercial consumers receiving service prior to May 10, 1993 may continue to receive service under this schedule. Commercial consumers connected on or after May 10, 1993 will receive under Schedule GS23.)

56

Data:9aaf93f4-e572-47bf-bea8-337afd5c5b7d | Open Energy Information  

Open Energy Info (EERE)

aaf93f4-e572-47bf-bea8-337afd5c5b7d aaf93f4-e572-47bf-bea8-337afd5c5b7d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Indiana REMC Effective date: 2010/06/01 End date if known: Rate name: 400w HPS Cobrahead Luminaire 30' WOOD POLE Sector: Lighting Description: Availability Available to any municipal, government agency, commercial account, or homeowners association for street lighting in and around public parking areas, public roads, and vehicle access roads. Applicant must be adjacent to an existing electric power line of the Corporation that is adequate and suitable for supplying the lighting service. Type of Service Dusk-to-dawn lighting service using photoelectric controlled equipment. All equipment, including fixtures, supporting structures and electrical apparatus shall be owned, installed, and maintained by the Corporation. Maintenance of the complete assembly and the cost of its electrical operation are included in this service. Any additional investment required for the extension of secondary service lines or the installation of a transformer, will be billed to the consumer.

57

Data:5a9e21af-3012-46ef-8472-9986bd4a2aaf | Open Energy Information  

Open Energy Info (EERE)

af-3012-46ef-8472-9986bd4a2aaf af-3012-46ef-8472-9986bd4a2aaf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Gresham, Wisconsin (Utility Company) Effective date: 2010/07/01 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand Primary Metering Discount with Parallel Generation(20 kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0627 per kilowatt-hour.

58

Data:7a8bd4e5-52a2-461b-a62a-af10371d264e | Open Energy Information  

Open Energy Info (EERE)

e5-52a2-461b-a62a-af10371d264e e5-52a2-461b-a62a-af10371d264e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Atlantic City Electric Co Effective date: 2012/11/01 End date if known: Rate name: MGS Primary CIEP>500kW Single Phase Sector: Commercial Description: Available at any point of Company's system where facilities of adequate character and capacity exist for the entire electric service requirements of any customer delivered at one point and metered at or compensated to the voltage of delivery. This schedule is not available to residential customers. This is a bundled service Source or reference: http://www.atlanticcityelectric.com/_res/documents/NJTariffSectionIV.pdf

59

Data:53bd76aa-f1f6-412d-ae28-e52010b5239f | Open Energy Information  

Open Energy Info (EERE)

6aa-f1f6-412d-ae28-e52010b5239f 6aa-f1f6-412d-ae28-e52010b5239f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Residential Sector: Residential Description: *Applicable to all residential customer in individually metered family residences for all domestic uses within the city limits. Individual single phase motors or heating equipment shall not exceed 15 hp or 15 kW in size. Subject to production cost adjustment and power factor adjustment. Load management credit of $5.60/month during summer months (June-September) for customers with master metering and city controlled load management.

60

Data:90130671-0e73-425a-af0f-6fea066c4732 | Open Energy Information  

Open Energy Info (EERE)

71-0e73-425a-af0f-6fea066c4732 71-0e73-425a-af0f-6fea066c4732 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Carroll County REMC Effective date: 2012/04/01 End date if known: Rate name: CONTROLLED IRRIGATION LOAD Sector: Commercial Description: Facilities Charge - $38.00 All kWh $0.0595 per kWh Source or reference: http://www.cwremc.com/index.php?option=com_content&view=article&id=139&Itemid=86 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Data:529a047d-7a89-4aaf-a32f-f50e72daa1c5 | Open Energy Information  

Open Energy Info (EERE)

47d-7a89-4aaf-a32f-f50e72daa1c5 47d-7a89-4aaf-a32f-f50e72daa1c5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Niles, Ohio (Utility Company) Effective date: 2011/12/01 End date if known: Rate name: Commercial Single phase secondary service rate A (outside city rate) Sector: Commercial Description: *Available for secondary light and power service to residential, commercial, institutional, or industrial establishments and to apartments served through one meter for each unit. Single phase motors with locked rotor current not exceeding 130 amperes served at nominal 208 or 240 volts may be included with single phase lighting service furnished through one meter.

62

Data:58a8e85e-d1df-4012-b8e6-aaf542b4d1c9 | Open Energy Information  

Open Energy Info (EERE)

e-d1df-4012-b8e6-aaf542b4d1c9 e-d1df-4012-b8e6-aaf542b4d1c9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Connecticut Light & Power Co Effective date: 2013/07/01 End date if known: Rate name: Rate 37 - Intermediate Time-Of-Day General Electric Service (Distribution Service Facilities Ownership) Sector: Commercial Description: AVAILABLE for the electrical requirements where the customer's maximum demand is equaled or exceeded in the last twelve months, or shall equal or exceed in the next twelve months, 200 kW but less than 350 kW and delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters.

63

Data:094a6749-870f-4e1b-aaf2-9513585e03e3 | Open Energy Information  

Open Energy Info (EERE)

749-870f-4e1b-aaf2-9513585e03e3 749-870f-4e1b-aaf2-9513585e03e3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp Effective date: 2008/10/01 End date if known: Rate name: Outdoor Lighting MH Parking Lot 1000 W Sector: Lighting Description: Assuming Existing Pole Source or reference: http://www.tri-countyemc.com/skins/userfiles/file/Outdoor_lighting_1_2_3.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

64

Data:0f12537f-5485-483a-aaf0-36081ed02fd7 | Open Energy Information  

Open Energy Info (EERE)

537f-5485-483a-aaf0-36081ed02fd7 537f-5485-483a-aaf0-36081ed02fd7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Pardeeville, Wisconsin (Utility Company) Effective date: 2007/10/10 End date if known: Rate name: Cp-1 Small Power Service Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0680 per kilowatt-hour.

65

Data:6b7aaf31-a3dc-4208-ad5e-a83609ee2b92 | Open Energy Information  

Open Energy Info (EERE)

aaf31-a3dc-4208-ad5e-a83609ee2b92 aaf31-a3dc-4208-ad5e-a83609ee2b92 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: End date if known: Rate name: Industrial - Distribution Delivery - Single Phase Sector: Industrial Description: Applies to all customers who historically meet the following criteria: 1. average greater than 50 KW monthly demand per year, or 2. have a monthly demand greater than 100 KW two or more times per year, or 3. require service to an irrigation site. Load Management Options - Two options are available to C/I customers who wish to lower their coincidental demand charges by participating in the Load Management Program. 1. Full load management - Under full load management, the customer is expected to curtail load during all hours of load management. Under this option, the customer can avoid all seasonal coincidental demand charges. 2. Incremental pricing - Customers also have the option of purchasing energy during certain control periods. Nodak will provide a signal at the load management receiver indicating whether or not incremental energy is available. The customer is responsible to monitor the load management system status. If the customer chooses to operate through periods when incremental energy is available, coincidental demand charges will not accrue; however, an incremental adder will be charged for each kilowatt-hour consumed during those hours. These charges are as follows: Irrigation incremental adder up to *$0.12/Kwh All other C/I accounts incremental adder up to *$0.095/Kwh

66

Data:Ef81a0f7-11cc-4755-8e56-7713aaf72a0d | Open Energy Information  

Open Energy Info (EERE)

1a0f7-11cc-4755-8e56-7713aaf72a0d 1a0f7-11cc-4755-8e56-7713aaf72a0d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Austin, Minnesota (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Bulk Power > 10,000 kW Sector: Description: AVAILABLE: .Within established City Limits. APPLICABLE: Existing Customers, or to new Customers with demands of 10,000 kW or more for two (2) months in a 12-month period whose entire requirements are taken through one meter, under a contract of standard form. (Not applicable to resale, standby or auxiliary service.) CHARACTER OF SERVICE: AC, 60 cycles, 120 Volts or 120/240 Volts, single-phase: 240 Volts, three-phase, three wire; 120/240, 120/208 Volts, or 277/480 Volts, three-phase, four wire; or at any of Austin Utilities' standard Voltages where the service may be supplied by a single power transformer. POWER FACTOR ADJUSTMENT: The rates set forth in this schedule are based on the maintenance by the Customer of a power factor of not less than 95% at all times; if the power factor, as measured by the electric department, is lower than 95%, the monthly demand charge will be multiplied by the ratio 95% bears to the measured power factor, or at Austin Utilities' option, the power factor may be corrected at the Customer's expense.

67

Data:90a78948-5f79-436a-af57-d6f05dbac15c | Open Energy Information  

Open Energy Info (EERE)

948-5f79-436a-af57-d6f05dbac15c 948-5f79-436a-af57-d6f05dbac15c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Black River Falls, Wisconsin (Utility Company) Effective date: 2010/04/15 End date if known: Rate name: Residential Service Optional Time-of-Day Three Phase 9am-9pm Sector: Residential Description: Power Cost Adjustment Clause All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The current cost per kilowatt-hour of energy billed is equal to the cost of power purchased for the most recent month, divided by the kilowatt-hours of energy sold. The monthly adjustment (rounded to the nearest one one-hundredth of a cent) is equal to the current cost less the base cost. The base cost of power (U) is $0.0790 per kilowatt-hour. Application: This rate schedule is optional to all Rg-1, Residential Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule. Commitment to Community rider: Rg-2 Residential Service Optional TOD 3.0% of the total electric bill not to exceed $1.00

68

Data:A577e4c9-7aaf-486a-b7f5-f473e0a9ad9c | Open Energy Information  

Open Energy Info (EERE)

7e4c9-7aaf-486a-b7f5-f473e0a9ad9c 7e4c9-7aaf-486a-b7f5-f473e0a9ad9c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland, Washington (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Schedule 70: Security Lighting Metered Residential - 250 Watt or less Sector: Lighting Description: A. Availability: In all territory served by the City's electric utility. B. Applicability: To all property owners or long-term leasees of property. C. Contract Provisions: The rates in this schedule apply to facilities consisting of overhead construction with mast arms and luminaries mounted on wood poles with lumen output as shown. Lighting facilities supplied under this schedule shall remain the property of the City, and shall be supplied only pursuant to a contract with the customer, the term of which shall be a period of not less than three (3) years. Pole Rental: When an individual wood pole is required on a new installation, the following monthly charges apply: 40 feet or less $ 1.00 Over 40 feet $ 1.00 plus $0.05 per foot Additional charge will be made for lamps installed seventy-five (75) feet or more above the ground.

69

Data:344eb0b7-1e48-48e4-b98b-1def7825aaf3 | Open Energy Information  

Open Energy Info (EERE)

under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information...

70

ARM - Field Campaign - Routine AAF CLOWD Optical Radiative Observations  

NLE Websites -- All DOE Office Websites (Extended Search)

govCampaignsRoutine AAF CLOWD Optical Radiative Observations (RACORO) govCampaignsRoutine AAF CLOWD Optical Radiative Observations (RACORO) Campaign Links RACORO Website Related Campaigns Surface Radiation Comparison Transfer Measurements for RACORO 2009.01.20, Long, SGP Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : Routine AAF CLOWD Optical Radiative Observations (RACORO) 2009.01.22 - 2009.06.30 Website : http://acrf-campaign.arm.gov/racoro/ Lead Scientist : Andrew Vogelmann For data sets, see below. Description The ARM Aerial Facility (AAF) supported the Routine AAF Clouds with Low Optical Water Depths (CLOWD) Optical Radiative Observations (RACORO) field campaign, led by principal investigator Andrew Vogelmann. During this long-term campaign, the AAF conducted routine flights at the ACRF Southern

71

Data:084bc797-1e8b-442a-af55-2a497cfc1e43 | Open Energy Information  

Open Energy Info (EERE)

2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: White County Rural E M C Effective date: 20140101 End date if known: Rate name:...

72

Proposed Agency Information Collection: Federal Register Notice...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

54 - Aug. 10, 2011 Proposed Agency Information Collection: Federal Register Notice Volume 76, No. 154 - Aug. 10, 2011 The Department of Energy (DOE) invites public comment on DOE's...

73

Proposed Agency Information Collection: Federal Register Notice...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95 - Oct. 7, 2011 Proposed Agency Information Collection: Federal Register Notice Volume 76, No. 195 - Oct. 7, 2011 The Department of Energy (DOE) invites public comment on DOE's...

74

VULCAN Proposal Information | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Key Points for Beam Time Proposals Key Points for Beam Time Proposals The key points below are essential elements the Scientific Review Committee (SRC) considers when assigning a rating to your proposal for beam time on the VULCAN engineering instrument at SNS; see http://neutrons.ornl.gov/vulcan/. They apply to the Statement of Research, i.e., after the specified sections: Title, PI, abstract, facility requested, days requested, student involvement, experiment team, samples, and sample environment. Consideration of the key points will 1) encourage you to think through the feasibility and reasonableness of your proposed measurement and 2) provide relevant information to the SRC so they can make a sound judgment. Key points to include in your Statement of Research What scientific question are you trying to answer?

75

Standard Form 424 PROPOSAL INFORMATION SUMMARY  

E-Print Network (OSTI)

this proposal been submitted to any other agency for funding, if so, which? No 13. Proposal Abstract: See .................................................................................................................. 3 Abstract ............................................................................. 10 Proposed Work

Menke, William

76

Federal Register Notice: Proposed Agency Information Collection |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 11, 2011 - 10:57am October 11, 2011 - 10:57am Addthis Federal Register Notice (PDF Version) on the DOE's invitation for public comment on its request to the Office of Management and Budget (OMB) to extend for three years the Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910-5149 that DOE is developing for submission to OMB pursuant to the Paperwork Reduction Act of 1995. Comments due on or before November 7, 2011. OMB Form 83-I (PDF 70 KB). ICR Supporting Statement (PDF 85 KB). SGIG Reporting Guidance (PDF 99 KB). SUMMARY: The Department of Energy (DOE) invites public comment on DOE's request the Office of Management and Budget (OMB) to extend for three years the emergency Information Collection Request Title: OE Recovery Act

77

Federal Register Notice: Proposed Agency Information Collection |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 10, 2011 - 2:21pm August 10, 2011 - 2:21pm Addthis Federal Register Notice (PDF Version) on the DOE's invitation for public comment on its intent to request the Office of Management and Budget (OMB) to extend for four years the Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910-5149 that DOE is developing for submission to OMB pursuant to the Paperwork Reduction Act of 1995. Comments due on or before October 11, 2011. SUMMARY: The Department of Energy (DOE) invites public comment on DOE's intent to request OMB to renew Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910-5149 for an additional four years that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction

78

ARM - Submitting Proposals : Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

govField CampaignsSubmitting Proposals : Guidelines govField CampaignsSubmitting Proposals : Guidelines Schedule and Availability Preproposals now open for AMF and AAF Preproposals due 1 Feb Invited full proposals due 1 May AAF available Dec 2015 AMF1 available Apr 2016 AMF2 available early 2017 AMF3 available for guest instrumentation or intensive operational periods Forms Propose a Campaign Form Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps to Send Campaign Data to ARM Data Archive Field Campaign Guidelines (PDF, 1.1MB) Submitting Proposals : Guidelines Proposals are welcome from all members of the scientific community for conducting field campaigns and scientific research using the ARM Climate Research Facility sites at the Southern Great Plains (SGP), North Slope of Alaska (NSA), Tropical Western Pacific (TWP), one of the ARM Mobile

79

Proposed Agency Information Collection: Federal Register Notice Volume 76,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

54 - Aug. 10, 2011 54 - Aug. 10, 2011 Proposed Agency Information Collection: Federal Register Notice Volume 76, No. 154 - Aug. 10, 2011 The Department of Energy (DOE) invites public comment on DOE's intent to request OMB to renew Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910-5149 for an additional four years that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments regarding this proposed information collection must be received on or before October 11, 2011. ICR, OMB1910.5149.pdf More Documents & Publications Proposed Agency Information Collection: Federal Register Notice Volume 76, No. 195 - Oct. 7, 2011 Department of Energy Proposed Agency Information Collection: Federal

80

Department of Energy Proposed Agency Information Collection: Federal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

00 - May 25, 2010 00 - May 25, 2010 Department of Energy Proposed Agency Information Collection: Federal Register Notice Volume 75, No. 100 - May 25, 2010 Department of Energy Proposed Agency Information Collection. The Department of Energy (DOE) invites public comments on DOE's intent to request the Office of Management and Budget (OMB) to extend for three years the emergency Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910-5149 that DOE is developing for submission to OMB pursuant to the Paperwork Reduction Act of 1995. Federal Register Volume 75 No 100. Federal Register notice for the Department of Energy Proposed Agency Information Collection, May 25, 2010. More Documents & Publications Department of Energy Proposed Agency Information Collection: Federal

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Proposed Agency Information Collection: Federal Register Notice Volume 76,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95 - Oct. 7, 2011 95 - Oct. 7, 2011 Proposed Agency Information Collection: Federal Register Notice Volume 76, No. 195 - Oct. 7, 2011 The Department of Energy (DOE) invites public comment on DOE's request the Office of Management and Budget (OMB) to extend for three years the emergency Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910-5149 that DOE is submitting to OMB pursuant to the Paperwork Reduction Act of 1995. Comments regarding this proposed information collection must be received on or before November 7, 2011 2011-26061 OE FRN ARRA ICR 30.pdf More Documents & Publications Proposed Agency Information Collection: Federal Register Notice Volume 76, No. 154 - Aug. 10, 2011 Department of Energy Proposed Agency Information Collection: Federal

82

DOE to Hold Public Information Meetings On Proposed Permit Modification  

NLE Websites -- All DOE Office Websites (Extended Search)

Meeting Meeting On Proposed Permit Modification CARLSBAD, N.M., January 31, 2001 - The public is invited to comment on a proposed modification to the Hazardous Waste Facility Permit for the Waste Isolation Pilot Plant (WIPP). Submittal of the proposed modification to the New Mexico Environment Department (NMED) by the U.S. Department of Energy (DOE) begins a formal review process that includes a 60-day public comment period and a public information meeting. In its request, DOE proposes alternative methods of quality control for radiography, which is currently done through visual examination. The proposed alternative is Digital Radiography/Computed Tomography. The modification would allow DOE to take advantage of new technology that enables analysis of the contents of

83

PROPOSED PORTHOLE FOR ASTRONOMY MAJORS Information for Astronomy Majors  

E-Print Network (OSTI)

PROPOSED PORTHOLE FOR ASTRONOMY MAJORS Information for Astronomy Majors The Astronomy Major sciences such as Astronomy, Physics, or Engineering. (Link to details on Astrophysics Concentration) The General Astronomy Concentration is intended for students who do not plan on research careers in astronomy

Richardson Jr., James E.

84

Detailed Information on Proposal for US-Monbusho Collaoration  

E-Print Network (OSTI)

C / He /Ceramic Breeder / Be material system - Key: Measure interface thermal resistance at the Si be significant (T-breeding) · Beryllium (typically): Tmax thermal resistance between ceramicDetailed Information on Proposal for UNICEX-Hi US-Monbusho Collaoration Thermal

Abdou, Mohamed

85

ARM - Propose a Field Campaign  

NLE Websites -- All DOE Office Websites (Extended Search)

govCampaignsPropose a Campaign govCampaignsPropose a Campaign Schedule and Availability Preproposals now open for AMF and AAF Preproposals due 1 Feb Invited full proposals due 1 May AAF available Dec 2015 AMF1 available Apr 2016 AMF2 available early 2017 AMF3 available for guest instrumentation or intensive operational periods Forms Propose a Campaign Form Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps to Send Campaign Data to ARM Data Archive Field Campaign Guidelines (PDF, 1.1MB) Propose a Campaign : Preproposal Form Preproposals are short summaries of the proposed campaign and can originate with any scientist. Before you begin your preproposal, you should review the guidelines for submitting proposals. If you are preparing your preproposals locally on your computer, please

86

A Proposed Information Architecture for Telehealth System Interoperability  

SciTech Connect

Telemedicine technology is rapidly evolving. Whereas early telemedicine consultations relied primarily on video conferencing, consultations today may utilize video conferencing, medical peripherals, store-and-forward capabilities, electronic patient record management software, and/or a host of other emerging technologies. These remote care systems rely increasingly on distributed, collaborative information technology during the care delivery process, in its many forms. While these leading-edge systems are bellwethers for highly advanced telemedicine, the remote care market today is still immature. Most telemedicine systems are custom-designed and do not interoperate with other commercial offerings. Users are limited to a set of functionality that a single vendor provides and must often pay high prices to obtain this functionality, since vendors in this marketplace must deliver entire systems in order to compete. Besides increasing corporate research and development costs, this inhibits the ability of the user to make intelligent purchasing decisions regarding best-of-breed technologies. We propose a secure, object-oriented information architecture for telemedicine systems that promotes plug-and-play interaction between system components through standardized interfaces, communication protocols, messaging formats, and data definitions. In this architecture, each component functions as a black box, and components plug together in a lego-like fashion to achieve the desired device or system functionality. The architecture will support various ongoing standards work in the medical device arena.

Warren, S.; Craft, R.L.; Parks, R.C.; Gallagher, L.K.; Garcia, R.J.; Funkhouser, D.R.

1999-04-07T23:59:59.000Z

87

Ecofys-Sectoral Proposal Templates | Open Energy Information  

Open Energy Info (EERE)

Ecofys-Sectoral Proposal Templates Ecofys-Sectoral Proposal Templates Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Ecofys Sectoral Proposal Templates Agency/Company /Organization: Ecofys Partner: GtripleC Sector: Energy, Land Phase: Determine Baseline Topics: Baseline projection, GHG inventory, Low emission development planning Resource Type: Software/modeling tools User Interface: Spreadsheet Complexity/Ease of Use: Moderate Website: www.sectoral-approaches.net/ Cost: Free References: Ecofys Sectoral Proposal Templates[1] The 'Sectoral Proposal Templates' aim at supporting developing countries in proposing sectoral emission baselines under a post-Kyoto climate regime. The sectoral approach underlying this work is seen as a means to scale-up investments in clean technology and systems in developing countries.

88

Property:NEPA Proposed Action | Open Energy Information  

Open Energy Info (EERE)

Proposed Action Proposed Action Jump to: navigation, search Property Name NEPA Proposed Action Property Type Text Pages using the property "NEPA Proposed Action" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + NGP is proposing a geothermal development project which includes the construction and operation of power generation facilities, geothermal fluid production and injection well pads and wells, access roads, geothermal fluid pipelines, groundwater production wells, an electrical transmission line and switching station, and support facilities. NGP submitted an application (N-82701) and Plan of Development (PoD) to the BLM Winnemucca Field Office (WFO), for approval of a right-of-way (ROW) for those portions of the transmission line located on public lands managed by the BLM. SPPCo submitted an application (N-83479) to the BLM WFO for approval of a ROW for the electrical switching station to be built at the point of interconnection of the NGP transmission line with the existing SPPCo transmission line. An Operations Plan was submitted for approval to drill and test geothermal wells proposed on public land (within federal geothermal lease NVN-58196) which would be used for the project. A Utilization Plan was submitted for approval of utilization facilities proposed on public land to be used for the project. Geothermal Drilling Permits (GDPs) will be submitted for downhole casing and cementing engineering approval for each well as the project progresses.

89

Request for Information Regarding a Proposed Funding Opportunity...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1:05am Addthis The purpose of this Request for Information (RFI) is to solicit feedback from industry, academia, research laboratories, government agencies, and other stakeholders...

90

Request for Information Regarding a Proposed Funding Opportunity...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2:00am Addthis The purpose of this Request for Information (RFI) is to solicit feedback from industry, academia, research laboratories, government agencies, and other stakeholders...

91

Ecofys-Sectoral Proposal Templates | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Ecofys-Sectoral Proposal Templates (Redirected from Ecofys Sectoral Proposal Templates) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Ecofys Sectoral Proposal Templates Agency/Company /Organization: Ecofys Partner: GtripleC Sector: Energy, Land Phase: Determine Baseline Topics: Baseline projection, GHG inventory, Low emission development planning Resource Type: Software/modeling tools User Interface: Spreadsheet Complexity/Ease of Use: Moderate Website: www.sectoral-approaches.net/ Cost: Free References: Ecofys Sectoral Proposal Templates[1]

92

California's Climate Change Proposed Scoping Plan | Open Energy Information  

Open Energy Info (EERE)

Climate Change Proposed Scoping Plan Climate Change Proposed Scoping Plan Jump to: navigation, search Name California's Climate Change Proposed Scoping Plan Agency/Company /Organization State of California Resource Type Publications, Lessons learned/best practices Website http://www.arb.ca.gov/cc/scopi Country United States Northern America References California's Climate Change Scoping Plan[1] Background "The Assembly Bill 32 Scoping Plan contains the main strategies California will use to reduce the greenhouse gases (GHG) that cause climate change. The scoping plan has a range of GHG reduction actions which include direct regulations, alternative compliance mechanisms, monetary and non-monetary incentives, voluntary actions, market-based mechanisms such as a cap-and-trade system, and an AB 32 program implementation regulation to

93

REDD+ Country Readiness Preparation Proposals | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » REDD+ Country Readiness Preparation Proposals Jump to: navigation, search Tool Summary LAUNCH TOOL Name: REDD+ Country Readiness Preparation Proposals Agency/Company /Organization: World Resources Institute Focus Area: Forestry Topics: Implementation, Policies/deployment programs, Pathways analysis Resource Type: Publications, Guide/manual Website: www.wri.org/publication/getting-ready Country: Democratic Republic of Congo, Ghana, Guyana, Indonesia, Madagascar, Mexico, Suriname, Panama Middle Africa, Western Africa, South America, South-Eastern Asia, Eastern Africa, Central America, South America, Central America

94

Technical Support Document Supporting Information for DOE Notice of Proposed Rulemaking Page 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Proposed Rulemaking Page 1 Notice of Proposed Rulemaking Page 1 Department of Energy Technical Support Document National Environmental Policy Act Implementing Procedures Supplement to Notice of Proposed Rulemaking Proposed Changes and Supplemental Supporting Basis December 17, 2010 This Technical Support Document supplements the Department of Energy's (DOE's) Notice of Proposed Rulemaking. In this Technical Support Document, the Department of Energy presents each of the proposed changes to its NEPA implementing regulations (10 CFR part 1021, Subparts C and D) and provides information that supplements the Preamble discussion of the supporting basis for each proposed change. If a provision of DOE's NEPA implementing regulations is not included in the table, DOE does not propose to change it. The left column of the table below shows the proposed changes in

95

The Energy Information Administration is proposing the following revisions to their electricity survey forms in 2011:  

U.S. Energy Information Administration (EIA) Indexed Site

Energy Information Administration proposed the following revisions to their electricity Energy Information Administration proposed the following revisions to their electricity survey forms in 2011: F or m E I A -411, " C oor dinated B ulk Power Supply Pr ogr am R epor t." * Change form name to "Coordinated Bulk Power Supply & Demand Program Report;" return to collecting projected reliability data on a 10-year basis as opposed to 5 years. Change "Council" to "Regional Entity" and add submission of Sub-regional level breakout of data. * Return to reporting on capacity and transmission planning for a 10-year horizon, rather than a 5-year horizon. * Adopt the current NERC 2009 Schedule 3 for summer and winter aggregated demand and supply information. Changes are as follows: Demand category additions include

96

Microsoft Word - Comments re DOE Proposed Information Collection Request 072610.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments regarding U.S. Department of Energy Proposed Agency Information Comments regarding U.S. Department of Energy Proposed Agency Information Collection Request, Federal Register/Vol. 75, No. 100, Tuesday, May 25, 2010/Notices July 26, 2010 Matthew Grosso U.S. Department of Energy OE/Forrestal Building 1000 Independence Avenue, S.W. Washington, DC 20585 Dear Mr. Grosso: Overview: As recipients of federal funding under the Smart Grid Investment Grant (SGIG) and Smart Grid Demonstration Grant (SGDG) programs, we appreciate the opportunity to comment on the U.S. Department of Energy's (DOE) request to the Office of Management and Budget (OMB) for a three-year extension of DOE's emergency authority to require monthly project reporting under the Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910-5149.

97

UNITED STATES OF AMERICA BEFORE THE DEPARTMENT OF ENERGY Energy Information Administration Proposal to Create )  

Gasoline and Diesel Fuel Update (EIA)

UNITED STATES OF AMERICA UNITED STATES OF AMERICA BEFORE THE DEPARTMENT OF ENERGY ) Energy Information Administration Proposal to Create ) Form EIA-930, ''Balancing Authority Operations Report'' ) ) COMMENTS OF THE ISO/RTO COUNCIL Pursuant to the Federal Register Notice ("Notice") 1 issued by the Department of Energy, the ISO/RTO Council ("IRC") 2 submits the following comments on the proposed new EIA reporting obligation that would be required pursuant to proposed Form EIA-930 - ''Balancing Authority Operations Report.'' The EIA proposal was published on March 6, 2013, and public comments were requested by May 6, 2013. Form EIA-930 is a new survey that would require Balancing Authorities, such as the IRC members, to provide hourly electric power operating data, including:

98

Categorical Exclusion B5.13 Supporting Information for DOE Notice of Proposed Rulemaking Page 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B5.13 Supporting Information for DOE Notice of Proposed Rulemaking Page 1 B5.13 Supporting Information for DOE Notice of Proposed Rulemaking Page 1 Experience from Geologic CO 2 Storage Field Projects Supported by DOE's Sequestration Program Background: The U.S. DOE's Sequestration Program began with a small appropriation of $1M in 1997 and has grown to be the largest most comprehensive CCS R&D program in the world. The U.S. DOE's sequestration program has supported a number of projects implementing CO 2 injection in the United States and other countries including, Canada, Algeria, Norway, Australia, and Germany. The program has also been supporting a number of complementary R&D projects investigating the science of storage, simulation, risk assessment, and monitoring the fate of the injected CO 2 in the subsurface.

99

Federal Register notice for the Department of Energy Proposed Agency Information Collection, July 22, 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

726 Federal Register 726 Federal Register / Vol. 75, No. 140 / Thursday, July 22, 2010 / Notices e.g. new, revision, extension, existing or reinstatement; (2) Title; (3) Summary of the collection; (4) Description of the need for, and proposed use of, the information; (5) Respondents and frequency of collection; and (6) Reporting and/or Recordkeeping burden. OMB invites public comment. The Department of Education is especially interested in public comment addressing the following issues: (1) Is this collection necessary to the proper functions of the Department; (2) will this information be processed and used in a timely manner; (3) is the estimate of burden accurate; (4) how might the Department enhance the quality, utility, and clarity of the information to be collected; and (5) how might the

100

RCRA corrective action definitions under Subpart F and proposed Subpart S. RCRA Information Brief  

SciTech Connect

If EPA or the authorized State determines there has been a release of a hazardous waste or hazardous waste constituent at an interim status facility, RCRA Section 3008(h)(1) authorizes EPA or the authorized State to issue an administrative order requiring corrective action or other measures. There are no regulations specifically addressing corrective action orders under Subpart F. However, while an interim status facility is seeking a RCRA permit, the facility is required by 40 CFR 265 Subpart F to monitor ground water and report the results of this monitoring program to the regulatory agency. If a release of a hazardous waste or hazardous waste constituent occurs, the facility may be issued a RCRA Section 3008(h) Order to conduct corrective action. While the proposed Subpart S regulations apply specifically to SWMUs at permitted TSDFs, EPA intends to use similar corrective action requirements at interim status facilities where there has been a release of a hazardous waste or hazardous waste constituent. The specific requirements for corrective action at an interim status facility will be specified in a RCRA Section 3008(h) Order. Alternatively, EPA may compel corrective action under proposed Subpart S through a permit Schedule of Compliance, especially if the permit is expected to be issued in the near term. This information Brief discusses the terminology used in the two corrective action programs and discusses both the proposed Subpart S rule and the final CAMU and TU rule.

Not Available

1994-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Department of Energy Proposed Agency Information Collection: Federal Register Notice Volume 75, No. 140- Jul. 22, 2010  

Energy.gov (U.S. Department of Energy (DOE))

Department of Energy proposed Agency Information Collection: The Department of Energy (DOE) invites public comment on DOEs request to the Office of Management and Budget (OMB) to extend for three...

102

Request for Information Regarding a Proposed Funding Opportunity for Administration of the Wave Energy Converter Prize  

Energy.gov (U.S. Department of Energy (DOE))

This announcement is intended to serve as a Notice of Intent of the upcoming Funding Opportunity Announcement (FOA) regarding Administration of the Wave Energy Converter (WEC) Prize and Request for Information to solicit information regarding pote

103

GRR/Elements/14-CA-c.10 - Propose Revisions | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Elements/14-CA-c.10 - Propose Revisions < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 14-CA-c.10 - Propose Revisions The Regional Board determines whether the draft requirements provide protection to ground and surface waters with present or anticipated beneficial use. If the Regional Board determines the draft requirements are not adequate, the Regional Board has 30 days to propose revisions which satisfy the Regional Board's concerns. Logic Chain No Parents \V/ GRR/Elements/14-CA-c.10 - Propose Revisions (this page) \V/ No Dependents Under Development Add.png Add an Element Retrieved from "http://en.openei.org/w/index.php?title=GRR/Elements/14-CA-c.10_-_Propose_Revisions&oldid=539622"

104

Request for Information Regarding a Proposed Funding Opportunity for Administration of the Wave Energy Converter Prize  

Energy.gov (U.S. Department of Energy (DOE))

This announcement is intended to serve as a Notice of Intent of the upcoming Funding Opportunity Announcement (FOA) regarding Administration of the Wave Energy Converter (WEC) Prize and Request for Information.

105

ARM Aerial Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

govSitesAerial Facility govSitesAerial Facility AAF Information Proposal Process Science (PDF) Baseline Instruments Campaign Instruments Instrumentation Workshop 2008 AAF Fact Sheet G-1 Fact Sheet Images Field Campaigns AAF Campaigns 2007 - UAV Campaigns 1993 - 2006, 2015 Other Aircraft Campaigns 1993 - 2010 AAF Contacts Rickey Petty DOE AAF Program Director Beat Schmid Technical Director ARM Aerial Facility Numerous instrumented aircraft participated in CLASIC, a cross-disciplinary interagency research effort. Numerous instrumented aircraft participated in CLASIC, a cross-disciplinary interagency research effort. As an integral measurement capability of the ARM Climate Research Facility, the ARM Aerial Facility (AAF) provides airborne measurements required to answer science questions proposed by the ARM Science Team and the external

106

ARM - Other Aircraft Campaigns  

NLE Websites -- All DOE Office Websites (Extended Search)

FacilityOther Aircraft Campaigns FacilityOther Aircraft Campaigns AAF Information Proposal Process Science (PDF) Baseline Instruments Campaign Instruments Instrumentation Workshop 2008 AAF Fact Sheet G-1 Fact Sheet Images Field Campaigns AAF Campaigns 2007 - UAV Campaigns 1993 - 2006, 2015 Other Aircraft Campaigns 1993 - 2010 AAF Contacts Rickey Petty DOE AAF Program Director Beat Schmid Technical Director Other Aircraft Campaigns In addition to AAF and UAV field campaigns, the ARM Climate Research Facility has hosted the following campaigns that included aircraft. Start Date Status Campaign Name Duration Lead Scientist Site 2010-05-01 Approved Deep Convective Clouds and Chemistry 2 months Christopher Cantrell SGP 2006-01-01 Past RAdiative Divergence using AMF, GERB and AMMA STations (RADAGAST) 1.0 years Anthony Slingo AMF

107

ARM - Site Instruments  

NLE Websites -- All DOE Office Websites (Extended Search)

FacilityInstruments FacilityInstruments AAF Information Proposal Process Science (PDF) Baseline Instruments Campaign Instruments Instrumentation Workshop 2008 AAF Fact Sheet G-1 Fact Sheet Images Field Campaigns AAF Campaigns 2007 - UAV Campaigns 1993 - 2006, 2015 Other Aircraft Campaigns 1993 - 2010 AAF Contacts Rickey Petty DOE AAF Program Director Beat Schmid Technical Director AAF Baseline Instruments The following instruments represent available capabilities. The needs of each field campaign will be assessed and additional instruments may be added upon request. For a list of past campaign instruments and their data, see the Airborne Observations instruments. Examples of cabin configurations for the G-1 from past and upcoming campaigns are also available. Payload Example from 2010 Payload Example from 2010

108

Proposed Action  

E-Print Network (OSTI)

Plan and made determinations of may effect, likely to adversely affect for the Pitcher's thistle, Kirtland's warbler, bald eagle, piping plover, Karner blue butterfly, and Indiana bat. The Forest made a determination of may effect, not likely to adversely affect for designated piping plover critical habitat. September 16, 2005: The Service responded to the Forests request for formal consultation, indicating that the information received in the BA constituted a complete initiation package. September December 2005: Jessica Hogrefe (USFWS) worked with Forest biologists via email and telephone to discuss the proposed Plan and effects to listed species.

U. S. Fish; Wildlife Service

2006-01-01T23:59:59.000Z

109

51452 Federal Register / Vol. 60, No. 190 / Monday, October 2, 1995 / Proposed Rules (3) Additional information concerning  

E-Print Network (OSTI)

to the Field Supervisor of the Carlsbad Field Office (see ADDRESSES section). National Environmental Policy Act cited herein is available upon request from the U.S. Fish and Wildlife Service, Carlsbad Field Office (see ADDRESSES above). Author This proposed rule was prepared by the staff of the Carlsbad Field Office

110

EMSL: Proposal Guidance:  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance for Fiscal Year 2014 Guidance for Fiscal Year 2014 Published December 2013 EMSL awards the majority of resources to proposals responding to the annual calls/cycles. To expedite the decision process, please contact the appropriate Capability Lead(s) based on your resource needs before beginning a proposal. Capabilities and contact information are detailed on EMSL's capability web pages. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo An EMSL user proposal requires detailed information for a thorough peer and

111

Data:F64bcf6c-3680-4940-bfc8-f74a83aa9aaf | Open Energy Information  

Open Energy Info (EERE)

February 2 March 2 April 2 May 2 June 1 July 1 August 1 September 1 October 2 November 2 December 2 Time of Use Demand Charge Structures Structure for Rate Period 1 Tier Max Usage...

112

Data:7aaf5e82-1d65-4912-a6cb-e112796621d0 | Open Energy Information  

Open Energy Info (EERE)

C of Schedule WPA-1Q. Source or reference: http:www.svec.coopdocumentsCoincidentPeak-LoadControlPCQ-2RateSchedule-j.aspx Source Parent: Comments Applicability Demand (kW)...

113

Data:A494ad2e-ee48-408a-af1d-f8c063ebcd43 | Open Energy Information  

Open Energy Info (EERE)

are required to be on this rate for all uses. Source or reference: http:www.dleg.state.mi.usmpscelectricratebooksmidwestmidwest2cur.pdf Source Parent: http:...

114

Data:Ca0415db-95b1-445a-af80-466039ae10f7 | Open Energy Information  

Open Energy Info (EERE)

Sector: Industrial Description: Applies to the Counties of Greeley, Wichita, Scott, Hamilton, Kearny, Finney & Gray. Available to customers who are currently served under the GSL...

115

Data:9aaf2445-9bcb-47ad-ba23-674fdf0cca53 | Open Energy Information  

Open Energy Info (EERE)

Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service...

116

SPPR Group Proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Proposal June 23, 2010 Agenda Purpose of Meeting Presenters Background Information  Three Terminal Plan & Market Access  Business Case  Transmission Infrastructure Program ED5-Palo Verde Project Potential Rate Impacts Discussion / Comments 2 Purpose of Meeting Provide background information Share the SPPR Group's current proposal and how it might affect Parker-Davis Project (P-DP) customers Obtain your feedback on the proposal 3 Presenters Background Information - Todd Rhoades ED5-PV Project Description - Todd Rhoades Project Marketability - John Steward Project Cost & Financing - Jack Murray Potential Rate Impacts - Jack Murray Next Steps - Todd Rhoades 4 Three Terminal Plan November 2009 5 Business Case

117

EMSL: Proposal Extensions  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Summary/Extension for Fiscal Year 2014 Proposal Summary/Extension for Fiscal Year 2014 Published December 2013. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo Summaries of the work performed with EMSL resources are required for all user projects (see details below) and should be submitted through the User Portal. For projects open for one year or less, these summaries are due when the proposal closes. For projects that are submitted in response to a Call for Proposals and are eligible for yearly extensions, summaries are

118

LBNL Frequently Needed Proposal Information  

E-Print Network (OSTI)

National Laboratory was founded by Nobel Laureate, Dr. Ernest Orlando Lawrence in 1931. For more Orlando Lawrence Berkeley National Laboratory" LBNL/Office of Sponsored Projects Office Address Lawrence or Linda Nowell at lcnowell@lbl.gov (510) 486-6873. About Lawrence Berkeley National Laboratory Lawrence

119

Proposal Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Testbed Results Current Testbed Research Proposal Process Terms and Conditions Dark Fiber Testbed Performance (perfSONAR) Software & Tools Development Partnerships...

120

Unsolicited Proposals  

Directives, Delegations, and Requirements

The order sets forth Department of Energy (DOE) requirements and responsibilities for the receipt, processing, and review of unsolicited proposals (USPs). To ensure that those submitting USPs are notified in a timely manner of the status (e.g., pending, accepted for funding, or declined) of their proposals. Cancels DOE O 542.2. Certified 12-28-06.

2002-02-27T23:59:59.000Z

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Synthesis and Comparison of Baseline Avian and Bat Use, Raptor Nesting and Mortality Information from Proposed and Existing Wind Developments: Final Report.  

SciTech Connect

Primarily due to concerns generated from observed raptor mortality at the Altamont Pass (CA) wind plant, one of the first commercial electricity generating wind plants in the U.S., new proposed wind projects both within and outside of California have received a great deal of scrutiny and environmental review. A large amount of baseline and operational monitoring data have been collected at proposed and existing U.S. wind plants. The primary use of the avian baseline data collected at wind developments has been to estimate the overall project impacts (e.g., very low, low, moderate, and high relative mortality) on birds, especially raptors and sensitive species (e.g., state and federally listed species). In a few cases, these data have also been used for guiding placement of turbines within a project boundary. This new information has strengthened our ability to accurately predict and mitigate impacts from new projects. This report should assist various stakeholders in the interpretation and use of this large information source in evaluating new projects. This report also suggests that the level of baseline data (e.g., avian use data) required to adequately assess expected impacts of some projects may be reduced. This report provides an evaluation of the ability to predict direct impacts on avian resources (primarily raptors and waterfowl/waterbirds) using less than an entire year of baseline avian use data (one season, two seasons, etc.). This evaluation is important because pre-construction wildlife surveys can be one of the most time-consuming aspects of permitting wind power projects. For baseline data, this study focuses primarily on standardized avian use data usually collected using point count survey methodology and raptor nest survey data. In addition to avian use and raptor nest survey data, other baseline data is usually collected at a proposed project to further quantify potential impacts. These surveys often include vegetation mapping and state or federal sensitive-status wildlife and plant surveys if there is a likelihood of these species occurring in the vicinity of the project area. This report does not address these types of surveys, however, it is assumed in this document that those surveys are conducted when appropriate to help further quantify potential impacts. The amount and extent of ecological baseline data to collect at a wind project should be determined on a case-by-case basis. The decision should use information gained from this report, recent information from new projects (e.g., Stateline OR/WA), existing project site data from agencies and other knowledgeable groups/individuals, public scoping, and results of vegetation and habitat mapping. Other factors that should also be considered include the likelihood of the presence of sensitive species at the site and expected impacts to those species, project size and project layout.

Erickson, Wallace P.

2002-12-01T23:59:59.000Z

122

2013 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity Survey Form Changes in 2013 The U.S. Energy Information Administration (EIA) proposed changes to its electricity data collection in 2013. These changes involve three forms: Form EIA-861, "Annual Electric Power Industry Report" The addition of a new form, the Form EIA-861S, "Annual Electric Power Industry Report (Short Form)" Form EIA-923, "Power Plant Operations Report." The proposals were initially announced to the public via a Federal Register Notice published March 15, 2012. Comments regarding this proposed information collection were due by May 14, 2012. EIA reviewed all comments and made several revisions to the proposals as a result. A second Federal Register Notice was published on August 30, 2012. It outlined the proposals

123

Unsolicited Proposals  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy's (DOEs) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) which includes all DOE Program Research Areas.

124

Conceptual Proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

Monitoring-Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects Evan Mills, Ph.D Paul Mathew, Ph.D. Lawrence Berkeley National Laboratory Berkeley, California Report Prepared for: California Energy Commission Public Interest Energy Research (PIER) Technology Demonstration Program April 2009 Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process

125

Proposal Guidance for Fiscal Year 2014 | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

capability web pages. An EMSL user proposal requires detailed information for a thorough peer and management review. The Proposal Planning document (.pdf) will walk you through...

126

2014 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for 2014 The U.S. Energy Information Administration (EIA) is proposing changes to its electricity data collection in 2014. These changes involve the following surveys: Form EIA-63B, "Annual Photovoltaic Cell/Module Shipments Report," Form EIA-411, "Coordinated Bulk Power Supply Program Report," Form EIA-826, "Monthly Electric Utility Sales and Revenue Report with State Distributions," Form EIA-860, "Annual Electric Generator Report," Form EIA-860M, "Monthly Update to the Annual Electric Generator Report," Form EIA-861, "Annual Electric Power Industry Report," Form EIA-861S, "Annual Electric Power Industry Report (Short Form)," and

127

Proposed Transmission Towers Proposed New Substation Sites Proposed...  

NLE Websites -- All DOE Office Websites (Extended Search)

6-1E: Recreation Inset Maps for Map 6-1C and Map 6-1D Proposed Transmission Towers Proposed New Substation Sites Proposed Route Segments (not drawn to scale) New Access Roads...

128

60-DAY Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60-DAY Federal Register Notice - Proposed 60-DAY Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the

129

LANSCE | User Resources | Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Lujan Neutron Scattering Center: First Call for Proposals is now Closed. Thank you for your Submission. Proposal Submission The Lujan Center call for proposals opens May 6, 2014....

130

LANSCE | User Resources | Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals LANSCE accepts proposals for the Lujan Neutron Scattering Center, Proton Radiography (pRad) and the Weapons Neutron Research Facility (WNR). Calls for proposals are...

131

Proposed Changes to Emergency Action Levels  

E-Print Network (OSTI)

Reference (a) provided proposed changes to Vermont Yankee's (VY's) Emergency Action Levels (EALs). This letter provides additional information requested by USNRC staff during a telecon held on

Vermont Yankee; Gautam Sen; Richard J. Conte; Emergency Preparedness; Safeguards Branch; Division Of Reactor

132

60-DAY Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of

133

FACT SHEET U.S. Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

As an integral measurement capability of the ARM Climate Research Facility, the ARM Aerial Facility (AAF) provides airborne measurements required to answer science questions proposed by the international research community. Ground-based instrumentation at the ARM sites provides a unique and continuous record of the components of the atmospheric state and constituents that impact the surface radiation budget. The AAF enhances the utility and information content of long-term ground-based measurements by providing: * in situ measurements of cloud properties for evaluating and improving ground-based remote sensing retrievals * critical data for scaling ground-based remote sensing retrievals to larger temporal and spatial scales detected by satellites

134

Corporate and Foundation Proposal Checklist  

E-Print Network (OSTI)

Corporate and Foundation Proposal Checklist For additional information or assistance, please contact the MSU Foundation Office of Corporate and Foundation Relations at 994-2522 MSU Mission Statement MSU Foundation Mission Statement Needs Statement States the need using hard-core statistics

Dyer, Bill

135

DOE Proposes New Rules to Protect Trade Secrets and Confidential...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Trade Secrets and Confidential Business Information DOE Proposes New Rules to Protect Trade Secrets and Confidential Business Information March 8, 2011 - 5:26pm Addthis The...

136

General User Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS or the Participating Research...

137

General User Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

General User Proposals Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS or the...

138

General User Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Office General User Proposals Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS...

139

PROPOSAL PREPARATION INSTRUCTIONS  

NLE Websites -- All DOE Office Websites (Extended Search)

the escalation factors used for each fiscal year, the source of the proposed escalation rates, and the rationale as to why the proposed escalation rates are reasonable. (l)...

140

Scientific Partner Proposals | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

Partner Proposals One Scientific Partner's Experience Ron Heeren, with AMOLF in The Netherlands, collaborated with EMSL scientists through a Scientific Partner Proposal. As a...

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Section 1222 Program Proposed Plains & Eastern Project Frequently Asked Questions  

Energy.gov (U.S. Department of Energy (DOE))

Note: DOE intends to update these FAQs as more information about the proposed project and the review process becomes available.

142

Microfabrication Project Proposal Form Principle Investigator: (Person responsible for project)  

E-Print Network (OSTI)

Microfabrication Project Proposal Form Principle Investigator: (Person responsible for project: ___________________________________ Department: _____________________ _________________ __ Phone Number: _________________________ Project Information: Project Title: ________________________________________________________________ Funding Agency

143

JGI - CSP Proposal Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Schedule Proposal Schedule CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ Small-scale Microbial/Metagenome Proposals - reviewed twice yearly Small-scale proposals for specific types of microbial and metagenome projects are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for submission is 60 days prior to the review date. Next review dates (submission deadline in parentheses): January 2014 (Nov 22, 2013) July 2014 (May 23, 2014) Submit small-scale microbial/metagenome proposals anytime using the Work Initiation Process (WIP) interface. Synthetic Biology proposals Synthetic biology proposals are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for

144

2014 ALCC Proposals Due  

NLE Websites -- All DOE Office Websites (Extended Search)

ALCC Proposals Due February 3, 2014 2014 DOE ALCC Proposals Due February 3 December 23, 2013 by Francesca Verdier (0 Comments) DOE's 2014 call for its ASCR Leadership Computing...

145

CY15 Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

be given to JLF proposals that link to experiments, or proposed experiments, at the x-ray free electron laser facility Linear Coherent Light Source (LCLS) located at the SLAC...

146

General User Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals Print Tuesday, 01 June 2010 09:36 General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS...

147

Resubmitting a Proposal | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

be competing for more limited resources as a General proposal outside of the Call. Assess Peer Review Results Before you choose whether to revise and resubmit your proposal or...

148

JGI - CSP Proposal Study Panel  

NLE Websites -- All DOE Office Websites (Extended Search)

User Programs User Programs Project Management Office Community Science Program Emerging Technologies Opportunity Program Technology Development Pilot Program Genomic Encyc. of Bacteria and Archaea MyJGI: Information for Collaborators The CSP Proposal Study Panel CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | Project Management | Forms | FAQ | People and Contacts Members Nina Agabian University of California, San Francisco, http://www.ucsf.edu Chris Amemiya Benaroya Research Institute at Virginia Mason, http://www.benaroyaresearch.org Gary L. Andersen Lawrence Berkeley National Laboratory, http://www.lbl.gov Jo Ann Banks Purdue University, http://www.purdue.edu John Battista Louisiana State University, http://www.lsu.edu Fred Brockman

149

III. Waiver of Proposed Rulemaking  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

382 Federal Register 382 Federal Register / Vol. 77, No. 241 / Friday, December 14, 2012 / Rules and Regulations technical errors in § 447.400(a) and § 447.405 listed on page 66701. One correction ensures consistency between two sentences in the same paragraph and the other restores text inadvertently omitted from the final rule that had been included in the May 11, 2012 notice of proposed rulemaking (77 FR 27671) on pages 26789-90. Thus, we are correcting page 66701 to reflect the correct information. III. Waiver of Proposed Rulemaking We ordinarily publish a notice of proposed rulemaking in the Federal Register to provide a period for public comment before the provisions of a rule take effect in accordance with section 553(b) of the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). However,

150

General User Proposal Scores  

NLE Websites -- All DOE Office Websites (Extended Search)

General User Proposal Scores General User Proposal Scores General User Proposal Scores Print Tuesday, 01 June 2010 10:34 Scoring Proposals are scored on a scale of 1 to 5, with 1 being the best score and 5 the worst. Reviewers are requested to use the following ranking schema: Must do High Priority Medium Priority Low priority Don't do Beam time is assigned based on each proposal's score in relation to all other proposals for a given beamline. For beamlines where beamtime requests exceed available beamtime, a cutoff score is assigned after which no beam time is allocated. proposal scores Beam Time Cutoff Scores for the Current Cycle The table below lists the percent of beam time shifts allocated/requested for each beamline, and the cutoff scores, below which no beam time was assigned.

151

Model Investment Grade Audit and Project Proposal  

Energy.gov (U.S. Department of Energy (DOE))

Information and documents for conducting an investment grade audit to evaluate potential measures and presenting a project proposal for a set of bundled measures that deliver savings to pay for the project over the finance term.

152

NASA Asks Scientists For Voyager Proposals  

Science Journals Connector (OSTI)

NASA Asks Scientists For Voyager Proposals ... The primary objective of the mission, NASA says, is to obtain fundamental information about Mars, including the physics and chemistry of the planet body, surface, and atmosphere, with special emphasis on investigations relevant to possible Martian biology. ... NASA says that preliminary proposals should be submitted by Aug. 1, 1965. ...

1965-06-21T23:59:59.000Z

153

NETL: Unsolicited Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) as outlined in the link below which includes all DOE Program Research Areas. The...

154

Proposal Opportunities | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

Collaborative Science Initiative). Proposals are encouraged that couple experiments with theory, modeling or simulation, and access is granted beginning October 1 following award...

155

2015 Electricity Form Proposals  

Annual Energy Outlook 2012 (EIA)

include Congress, other government agencies, state governments, business and industry, private analysts and forecasters, and the general public. The proposed form was announced to...

156

Doctoral school COURSE PROPOSAL  

E-Print Network (OSTI)

Doctoral school COURSE PROPOSAL ED SPIM / Course proposal Page 1/2 2013 Title: The Web of data This course will give an overview of the principles of Linked Data along with the Web of Data, as it emerged architectures. This course also presents the concepts and definitions related to the Semantic Web (or Web

Jeanjean, Louis

157

Callfor2011 Grant Proposals  

E-Print Network (OSTI)

Callfor2011 Internship Grant Proposals Internship Grant Proposals are due on Monday, February 7, 2011 Communications Communications received an internship grant to estab- lish an internship program in the area. School of Family Life Anthropology Health Sciences Past Internship Grant Spotlights The School

Martinez, Tony R.

158

Proposal Review Panel Descriptions  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Review Panel Descriptions Proposal Review Panel Descriptions To ensure competent scientific review, a proposal may be assigned to a different panel (at the discretion of the Review Panel Chair), or the panel may seek additional ad hoc reviews from other experts. High-Pressure This panel reviews scattering and diffraction proposals that focus on materials at high pressure. Techniques such as (but not limited to) diffraction, nuclear resonant scattering, and inelastic x-ray scattering for materials at high pressure are appropriate for this panel to consider. Instrumentation This panel reviews proposals related to the development of beamline instrumentation, sample environments, x-ray optical components, and/or detectors that are relevant to synchrotron radiation research. This panel

159

CONFIGURATION CHANGE PROPOSAL FORM  

Energy.gov (U.S. Department of Energy (DOE))

This form is used for sharing information on Domain Name Server (DNS) changes, new requirements, modifications or enhancements within the DOE Headquarters Programmatic and Office Management Areas.

160

Implementation Proposal for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for Implementation Proposal for The National Action Plan on Demand Response Report to Congress Prepared by staff of the Federal Energy Regulatory Commission and the U.S. Department of Energy The opinions and views expressed in this staff report do not necessarily represent those of the Federal Energy Regulatory Commission, its Chairman, or individual Commissioners, and are not binding on the Commission. Implementation Proposal for The National Action Plan on Demand Response July 2011 TABLE OF CONTENTS Executive Summary ............................................................................................... iii I. Introduction ......................................................................................................1

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

30-Day Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}. DATES: Comments regarding this collection must be received on or before [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. If you anticipate that you will be submitting comments, but find it difficult

162

30-Day Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}. DATES: Comments regarding this collection must be received on or before [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. If you anticipate that you will be submitting comments, but find it difficult

163

predictive information, multi-information, and binding  

E-Print Network (OSTI)

predictive information, multi-information, and binding information Samer Abdallah and Mark Plumbley.1 ­ December 9, 2010 Abstract We introduce an information theoretic measure of dependency between multiple random variables, called `binding information' and compare it with several previously proposed measures

Plumbley, Mark

164

DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes DOE Withdraws Proposed Rulemaking (Test...

165

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21813 21813 Vol. 76, No. 75 Tuesday, April 19, 2011 DEPARTMENT OF ENERGY 10 CFR Part 429 [Docket Number: EERE-2010-BT-CE-0014] RIN 1904-AC23 Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Proposed rule. SUMMARY: The U.S. Department of Energy (DOE or the ''Department'') proposes to amend the compliance dates for revisions to its certification, compliance, and enforcement regulations for certain commercial and industrial equipment covered under the Energy Policy and Conservation Act of 1975, as amended (EPCA or the ''Act''). Specifically, DOE is tentatively proposing an 18-month extension to the

166

A Proposed Architecture  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposed Proposed Architecture for the NLC Diagnostic Regions Peter Tenenbaum, for the Diagnostic Region Group LCC-Note-0011 Draft 5-February-1999 1 introduction The NLC Main Linac CD-1 design contains 4 diagnostic regions (injection, extraction, and at the junctions between supersectors); the injector and beam delivery regions contain additional diagnostic regions modelled on those in the main linac, and one additional region may be added to the main linac (at the 330 GeV point, halfway through the third supersector). Each diagnostic region must support a variety of different beam measuring and manipulating tasks. In this Note we propose an overall architecture which permits all of these requirements to be met. 2 Requirements The main linac diagnostic regions must provide the following: * Beam position monitors for use by the conventional fast feedback system, and actuators (DC

167

A proposed gravitodynamic theory  

E-Print Network (OSTI)

This paper proposes a gravitodynamic theory because there are similarities between gravitational theory and electrodynamics. Based on Einstein's principle of equivalence, two coordinate conditions are proposed into the four-dimensional line element and transformations. As a consequence,the equation of motion for gravitational force or inertial force has a form similar to the equation of Lorentz force on a charge in electrodynamics. The inertial forces in auniformly rotating system are calculated, which show that the Coriolis force is produced by a magnetic-type gravitational field. We have also calculated the Sagnac effect due to the rotation. These experimental facts strongly support our proposed coordinate conditions. In addition, the gravitodynamic field equations are briefly discussed. Since only four gravitational potentials (3 + 1 split) enter the metric tensor, the gravitodynamic field equations in ``3+1 split" form would be analogous to Maxwell's equations.

T. Chang

1997-03-18T23:59:59.000Z

168

Unsolicited Proposals | Department of Energy  

Office of Environmental Management (EM)

Unsolicited Proposals Unsolicited Proposals The Department of Energy's (DOE's) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory...

169

Project Proposal Project Logistics  

E-Print Network (OSTI)

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

170

Proposed Drill Sites  

SciTech Connect

Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.

Lane, Michael

2013-06-28T23:59:59.000Z

171

Proposed Drill Sites  

DOE Data Explorer (OSTI)

Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.

Lane, Michael

172

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

75798 75798 Vol. 76, No. 233 Monday, December 5, 2011 DEPARTMENT OF ENERGY 5 CFR Chapter XXIII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information. SUMMARY: As part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is seeking comments and information from interested parties to assist DOE in reviewing its existing regulations to determine whether any such regulations should be modified, streamlined, expanded, or repealed. The purpose of DOE's review is to make the agency's regulatory program more effective and less burdensome in achieving its

173

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18954 18954 Vol. 76, No. 66 Wednesday, April 6, 2011 DEPARTMENT OF ENERGY 5 CFR Chapters XXIII and XXIV 10 CFR Chapters II, III, and X 18 CFR Chapter I 41 CFR Chapter 109 48 CFR Chapter 9 Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information; extension of public comment period. SUMMARY: On February 3, 2011, the Department of Energy (DOE) published a request for information (RFI) issued as part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review.'' This document announces that the period for submitting reply comments is extended to April 15, 2011. The February 3 document incorrectly published in the Notices section of the Federal Register.

174

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31548 31548 Vol. 77, No. 103 Tuesday, May 29, 2012 DEPARTMENT OF ENERGY 5 CFR Chapter XXII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Notice of extension of public comment period. SUMMARY: This notice announces that the period for submitting comments on the Department of Energy's (DOE) request for information (RFI) issued as part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' is extended to June 19, 2012. DATES: DOE will accept comments, data, and information regarding the RFI received no later than June 19, 2012. ADDRESSES: Interested persons are encouraged to submit comments, identified by ''Regulatory Burden RFI,'' by any of the following methods:

175

Business plan proposal  

E-Print Network (OSTI)

about you and your business. The following guideline has been provided to ensure that important points are included in the executive summary. Your business may believe that other information may be pertinent to the completion of the agribusiness plan..., partnership, corporation), if it is a merchandising, processing, or service related business. Is it a new business? an expansion? or a relocation? If it is a relocation, where are you currently located? Trace the history of your business: when was it formed...

Kucera, Carolyn

1991-01-01T23:59:59.000Z

176

Environmental Assessment - Proposed Actions  

NLE Websites -- All DOE Office Websites (Extended Search)

availability of Waste availability of Waste Isolation Pilot Plant (WIPP) facilities and infrastructure to scientists who wish to conduct experiments there. DOE would allow these experiments if they can be conducted without interfering with the WIPP's primary transuranic waste disposal mission and if they reflect contemporary budget priorities. This fact sheet presents questions and answers about the proposed action and its alternative. The deep geologic repository at the WIPP could provide a favorable environment for exper- iments in many scientific disciplines, including particle astrophysics, waste repository sci- ence, mining technology, low radiation dose physics, fissile materials accountability and transparency, and deep geophysics. Los Alamos National Laboratory has been conducting

177

SSRL- Proposal Review Panel  

NLE Websites -- All DOE Office Websites (Extended Search)

Stanford Synchrotron Radiation Lab Stanford Synchrotron Radiation Lab search Go [an error occurred while processing this directive] Proposal Review Panel Sub Panels Structural Molecular Biology & Biophysics Materials 1: Structure, Reactivity & Self-Assembly Materials 2: Electronic Properties, Magnetic Properties & Surface Science Molecular Environmental & Interface Science Membership Torgny Gustafsson Rutgers University Dept of Physics & Astronomy 136 Frelinghuysen Rd Piscataway NJ 08854-0849 Victor Henrich Yale University Dept of Applied Physics 327 Becton Center, 15 Prospect St. New Haven CT 06511 Christopher P. Hill University of Utah Biochemistry 15 N. Medical Dr. East, Rm 4100 Salt Lake City, UT 84112-5650 Franz Himpsel University of Wisconsin Dept of Physics 1150 University Avenue

178

Analysis of Two Proposed Renewable Electricity Standards  

Gasoline and Diesel Fuel Update (EIA)

4 4 Impacts of a 25-Percent Renewable Electricity Standard as Proposed in the American Clean Energy and Security Act Discussion Draft April 2009 Energy Information Administration Office of Integrated Analysis and Forecasting U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should be attributed to the Energy Information Administration and should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Service Reports are prepared by the Energy Information Administration upon special request and are based on assumptions specified by

179

Proposal Team: C. Burger  

NLE Websites -- All DOE Office Websites (Extended Search)

COMPLEX MATERIALS SCATTERING ( ) COMPLEX MATERIALS SCATTERING ( ) Proposal Team: C. Burger 1 , K. Cavicchi 2 , E. DiMasi 3 , A. Fluerasu 3 , S. Fraden 4 , M. Fukuto 3 , O. Gang 3 , B.S. Hsiao 1 , R.J. Kline 5 , S. Kumar 6 , O. Lavrentovich 6 , B. Ocko 3 , R. Pindak 3 , M. Rafailovich 1 , R.A. Register 7 , S. Sprunt 6 , H.H. Strey 1 , B.D. Vogt 8 , W.-L. Wu 5 , L. Wiegart 3 , K.G. Yager 3 1 Stony Brook University, 2 University of Akron, 3 Brookhaven National Lab, 4 Brandeis University, 5 NIST, 6 Kent State University, 7 Princeton University, 8 Arizona State University TECHNIQUES AND CAPABILITIES KEY CONCEPTS SELECTED APPLICATIONS * Small- and wide-angle x-ray scattering on 3PW source, in transmission and reflection mode: USAXS, SAXS, WAXS, GISAXS, GIXRD * High-throughput x-ray scattering for intelligent exploration of vast parameter spaces

180

Description of Proposed Action  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carlsbad Field Office Carlsbad Field Office RECORD OF CATEGORICAL EXCLUSION DETERMINATION 1 Description of Proposed Action Performance of a three-dimensional seismic survey line on approximately 2,409 acres contained within the WIPP Land Withdrawal Area as part of a larger survey to determine whether hydrocarbons are present in the region in quantities that warrant extraction and development. Number and Title of Applicable Categorical Exclusion B3.1 Site Characterization/Environmental Monitoring Activities covered by this Categorical Exclusion include, but are not limited to, site characterization and environmental monitoring under CERCLA and RCRA. Specific activities include, but are not limited to: (a) Geological, geophysical (such as gravity, magnetic, electrical, seismic, and radar), geochemical, and

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Request for Proposals for Final Energy Service Company Selection from Pre-Qualified Pool Documents  

Energy.gov (U.S. Department of Energy (DOE))

Information and documents about the Request for Proposals to select an Energy Service Company from a pre-qualified pool.

182

Information is not physical  

E-Print Network (OSTI)

The standard relations between information theory and thermodynamics are challenged. The Szilard engine is revisited and the bound proposed by Landauer is replaced by a different one which includes errors in information processing. Instead of equivalence, complementarity of information and thermodynamical entropy is advocated. Finally, the relations between error correction and self-replication of states which can carry information are discussed.

Robert Alicki

2014-02-11T23:59:59.000Z

183

RAPID/Roadmap/19-CA-e | Open Energy Information  

Open Energy Info (EERE)

proposed change(s); Information identifying any effects of the proposed change(s) on fish, wildlife, and other instream beneficial uses; Information identifying any effects of...

184

Webinar: Test Procedures for Dehumidifiers; Notice of Proposed Rulemaking  

Energy.gov (U.S. Department of Energy (DOE))

DOE is conducting a public meeting and webinar for the notice of proposed rulemaking regarding test procedures for residential dehumifiers. 79 FR 29271 (May 22, 2014). For more information, please...

185

PROPOSAL  

NLE Websites -- All DOE Office Websites (Extended Search)

Downhole Motors Downhole Motors Department of Energy National Petroleum Technology Office Final Report Work Performed Under Contract Task 03NT30429 Sub-Task 1: Current Capabilities of Hydraulic Motors, Air/Nitrogen Motors, and Electric Downhole Motors January 30, 2004 Prepared By: RIO Technical Services 4200 South Hulen, Suite 630 Fort Worth, Texas 76109 (817) 735-8264 RIO Technical Services Page 1 NPTO Downhole Motors TABLE OF CONTENTS Section 1.0................................................................................Introduction Section 2.0.................Brief History of Coil Tubing and Summary of Downhole Motors Section 3.0.....................................................................Results and Findings 3.1............Motors

186

PROPOSAL  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydraulic Motion & Fluid Movement Hydraulic Motion & Fluid Movement RIO Technical Services Page 1 Department of Energy National Petroleum Technology Office Final Report Work Performed Under Contract Task 03NT30429 Sub-Task 2: Hydraulic Motion & Fluid Movement Through Small Diameter Pipes and Wellbores December 12, 2003 Prepared By: RIO Technical Services 4200 South Hulen, Suite 630 Fort Worth, Texas 76109 (817) 735-8264 NPTO Hydraulic Motion & Fluid Movement RIO Technical Services Page 2 TABLE OF CONTENTS Section 1.0 .............................................................................Introduction Section 2.0........................................................................Results& Findings 2.1..........Significant Parameters Affecting Efficient Cuttings Transport

187

Proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

MiniBooNE Antineutrino Data Taking The MiniBooNE Collaboration (Dated: February 4, 2009) 1 EXECUTIVE SUMMARY The MiniBooNE experiment at Fermilab was designed to test the LSND...

188

Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

189

Proposed Rules DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Federal Register 4 Federal Register / Vol. 76, No. 1 / Monday, January 3, 2011 / Proposed Rules DEPARTMENT OF ENERGY [Docket ID: DOE-HQ-2010-0002] 10 CFR Part 1021 RIN 1990-AA34 National Environmental Policy Act Implementing Procedures AGENCY: Office of the General Counsel, U.S. Department of Energy. ACTION: Notice of proposed rulemaking and public hearing. SUMMARY: The U.S. Department of Energy (DOE or the Department) proposes to amend its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The majority of the changes are proposed for the categorical exclusions provisions contained in its NEPA Implementing Procedures, with a small number of related changes proposed for other provisions. These proposed changes are intended to better align the

190

STUDENT ADVISOR GUIDELINES PROPOSAL: ASSESSMENTS OF AND PROPOSED CHANGES  

E-Print Network (OSTI)

STUDENT ADVISOR GUIDELINES PROPOSAL: ASSESSMENTS OF AND PROPOSED CHANGES TO THE NJIT ADVISING PROCESS NEW JERSEY INSTITUTE OF TECHNOLOGY STUDENT SENATE STUDENT ADVISOR GUIDELINES COMMITTEE DECEMBER of NJIT as a whole. -2- #12;I. Students' Views of Advisors Obligations These are the recommendations

Bieber, Michael

191

BPA revises oversupply rate proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

oversupply-rate-proposal Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives...

192

OVERVIEW OF PROPOSED TRANSPORTATION ENERGY  

E-Print Network (OSTI)

.......................................................................................................................4 PROPOSED CALIFORNIA TRANSPORTATION FUEL PRICE FORECASTS......... 6 Summary....................................................................................................6 Petroleum Transportation Fuel Price Forecast Assumptions .............................................................6 California Transportation Fuel Price Forecasts

193

Review of Proposed Subcontract For Outsourcing Information Technology, IG-0406  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Inspector General wants to make the distribution of Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher,hr.doe.gov Depart of Energy Headquarters Anonymous FTP vm 1.hqadmin.doe.gov U.S. Department of Energy Human Resources and Administration Home Page http://www.hr.doe.gov/ig Your comments would be appreciated and can be provided on the

194

For more information  

NLE Websites -- All DOE Office Websites (Extended Search)

September 11, 2013. September 11, 2013. This call is for experiments anticipated to run from January through June 2014. Information and instructions To learn more about submitting a proposal for beam time, go to http://neutrons.ornl.gov/users/proposals.shtml or directly to the proposal system at www.ornl.gov/sci/iums/ipts/. Previously submitted proposals may be used as the basis for new proposals. All proposals will be reviewed for feasibility, safety, and the potential for high- impact science. Before beginning approved experiments, users must complete access and training requirements

195

For more information  

NLE Websites -- All DOE Office Websites (Extended Search)

February 26, 2014. February 26, 2014. This call is for experiments anticipated to run from July through December 2014. Information and instructions To learn more about submitting a proposal for beam time, go to http://neutrons.ornl.gov/users/proposals.shtml or directly to the proposal system at www.ornl.gov/sci/iums/ipts/. Previously submitted proposals may be used as the basis for new proposals. All proposals will be reviewed for feasibility, safety, and the potential for high- impact science. Before beginning approved experiments, users must complete access and training requirements

196

Information Request  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 25, 2008 November 25, 2008 TO: Sue Tierney, Phil Niedzielski-Eichner, Skila Harris FROM: Chris Kouts SUBJECT: Information Request As requested, enclosed is the additional information you requested yesterday. 1. Testimony: * September 24, 2008 before the Senate Committee on Commerce, Science and Transportation, * July 15, 2008 before the House Committee on Energy and Commerce * October 4, 2007 before the House Committee on the Budget and Chairman Spratt 2. Proposed Legislation "Nuclear Fuel Management and Disposal Act" submitted to Congress March 6, 2007 3. State-by-State Maps that outline each state's electricity generation mix, commercial spent nuclear fuel inventories, and payments into the Nuclear Waste Fund The additional information on the history of the use of engineered barriers will be

197

Proposed solar two project Barstow, California  

SciTech Connect

This Environmental Assessment (EA) evaluates the environmental consequences of the proposed conversion and operation of the existing Solar One Facility in Daggett, Ca, near the city of Barstow, to a nitrate salt based heat transfer system, Solar Two. The EA also addresses the alternatives of different solar conversion technologies and alternative sites and discusses a no action alternative. A primary objective of the Solar Two Project is to demonstrate the technical and economic feasibility of a solar central receiver power plant using molten salt as the thermal storage and transport fluid medium. If successful, the information gathered from the Solar Two Project could be used to design larger commercial solar power plants.

Not Available

1994-01-01T23:59:59.000Z

198

California Energy Commission PROPOSED REGULATIONS  

E-Print Network (OSTI)

California Energy Commission PROPOSED REGULATIONS ENFORCEMENT PROCEDURES CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr., Governor FEBRUARY 2013 CEC3002013002SD #12;CALIFORNIA ENERGY COMMISSION Lorraine Gonzalez Angela Gould Primary Authors and Project Managers Kate Zocchetti

199

Rules for Peer Review of Cycle 13 Chandra Proposals 10 May 2011  

E-Print Network (OSTI)

Rules for Peer Review of Cycle 13 Chandra Proposals 10 May 2011 Contents 1 Purpose and Documents 1 and Information on Proposals . . . . . . . . . . . . . . . . . . . . . . . 2 3 Peer Review 3 3.1 Panels for peer review of scientific proposals for use of the Chandra X-ray Observatory. Proposals are solicited

California at Santa Cruz, University of

200

Proposal Calendar | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Calendar Proposal Calendar 2014 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends 2014-1 Fri Nov-1-13 Tue Nov-19-13 Tue Dec-10-13 ~Dec-18-13 Tue Jan-28-14 Tue Apr-21-14 2014-2 Fri Mar-7-14 Tue Mar-25-14 Tue Apr-8-14 ~Apr-21-14 ~ May-14 ~Aug-14 2014-3 Fri Jul-11-14 Tue Jul-29-14 Tue Aug-12-14 ~Aug-25-14 ~ Oct-14 ~Dec-14 2015 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends 2015-1 Fri Oct-31-14 Tue Nov-18-14 Tue Dec--2-14 ~Dec-14-14 ~Jan-15 ~Apr-15 2015-2 Fri Mar-6-15 Tue Mar-24-15 Tue Apr-7-15 ~Apr-20-15 ~ May-15 ~Aug-15 2015-3 Fri Jul-10-15 Tue Jul-28-15 Tue Aug-11-15 ~Aug-24-15 ~ Oct-15 ~Dec-15 2016 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Deconstructing (2,0) proposals  

Science Journals Connector (OSTI)

We examine the relationships between three proposals for the six-dimensional (2,0) theory: the discrete light-cone quantization (DLCQ) of Aharony etal. [Adv. Theor. Math. Phys. 1, 148 (1998); Adv. Theor. Math. Phys. 2, 119 (1998)], the deconstruction prescription of Arkani-Hamed etal. [J. High Energy Phys. 01 (2003) 083], and the five-dimensional maximally supersymmetric Yang-Mills proposal of Douglas and Lambert etal. [J. High Energy Phys. 02 (2011) 011; J. High Energy Phys. 01 (2011) 083]. We show that Arkani-Hamed etal. gives a deconstruction of five-dimensional maximally supersymmetric Yang-Mills. The proposal of Aharony etal. uses a subset of the degrees of freedom of five-dimensional Yang-Mills, and we show that compactification of it on a circle of finite radius agrees with the DLCQ arising from the proposal of Douglas and Lambert etal. or from the deconstruction proposal of Arkani-Hamed etal.

N. Lambert; C. Papageorgakis; M. Schmidt-Sommerfeld

2013-07-12T23:59:59.000Z

202

N Springs expedited response action proposal  

SciTech Connect

Since signing the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in 1989, the parties to the agreement have recognized the need to modify the approach to conducting investigations, studies, and cleanup actions at Hanford. To implement this approach, the parties have jointly developed the Hanford Past-Practice Strategy. The strategy defines a non-time-critical expedited response action (ERA) as a response action ``needed to abate a threat to human health or welfare or the environment where sufficient time exists for formal planning prior to initiation of response. In accordance with the past-practice strategy, DOE proposes to conduct an ERA at the N Springs, located in the Hanford 100 N Area, to substantially reduce the strontium-90 transport into the river through the groundwater pathway. The purpose of this ERA proposal is to provide sufficient information to select a preferred alternative at N Springs. The nature of an ERA requires that alternatives developed for the ERA be field ready; therefore, all the technologies proposed for the ERA should be capable of addressing the circumstances at N Springs. A comparison of these alternatives is made based on protectiveness, cost, technical feasibility, and institutional considerations to arrive at a preferred alternative. Following the selection of an alternative, a design phase will be conducted; the design phase will include a detailed look at design parameters, performance specifications, and costs of the selected alternative. Testing will be conducted as required to generate design data.

Not Available

1994-01-01T23:59:59.000Z

203

Update: Proposed CE Curriculum & Program  

E-Print Network (OSTI)

Update: Proposed CE Curriculum & Program Bruce Jacob, End of Summer 2008 #12;What's all this, then, students, graduates · Held constituents' meeting over winter · Group vote this curriculum Barua has agreed to develop and teach the course ENEE 3xx (Digital systems) -- new course Bruce Jacob

Jacob, Bruce

204

Supplementary Proposal Department of Energy  

E-Print Network (OSTI)

Supplementary Proposal to the Department of Energy High Energy Physics Division for Research and Development for a Bottom Collider Detector in FY 1990 (January 31, 1990) R. Burnstein, H. Rubin Illinois Institute of Technology E. McCliment, Y. Onel U. Iowa N.S. Lockyer, R. van Berg U. Pennsylvania J

McDonald, Kirk

205

Climate Change Proposed Scoping Plan  

E-Print Network (OSTI)

Climate Change Proposed Scoping Plan a amework for change Prepared by the California Air Resources #12;CLIMATE CHANGE SCOPING PLAN State of California Air Resources Board Resolution 08-47 December 11 greenhouse gas (GHG) emissions that cause global warming; WHEREAS, the adverse impacts of climate change

206

Climate Change Proposed Scoping Plan  

E-Print Network (OSTI)

Climate Change Proposed Scoping Plan a amework for change Prepared by the California Air ResourcesBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

207

Proposed Revisions for Regents Policy  

E-Print Network (OSTI)

Proposed Revisions for Regents Policy: Faculty Tenure Arlene Carney Vice Provost for Faculty family friendliness for probationary period #12;Basis for Revisions of Faculty Tenure Policy · Changed definitions of Academic Freedom and Responsibility required changes in the tenure policy. · As more untenured

Amin, S. Massoud

208

California Energy Commission PROPOSED REGULATIONS  

E-Print Network (OSTI)

California Energy Commission PROPOSED REGULATIONS MARCH 2012 CEC-400-2010-004-SD3, Article 9, Sections 1680 1685 CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr., Governor #12;CALIFORNIA ENERGY COMMISSION Martha Brook Program Senior Mechanical Engineer Justin Regnier Project Manager

209

California Energy Commission PROPOSED REGULATIONS  

E-Print Network (OSTI)

, such as fossil fuelbased power plants, and may ameliorate air quality problems and improve public health renewable energy resources, such as wind, solar, biomass, landfill gas, digester gas, geothermal, or smallCalifornia Energy Commission PROPOSED REGULATIONS INITIAL STATEMENT OF REASONS FOR ENFORCEMENT

210

Review of kaon factory proposals  

SciTech Connect

Nuclear physics issues and particle physics issues for a kaon factory are discussed. Kaon factory accelerator proposals are then considered. Secondary beam considerations are covered and hardware development for a kaon factory is discussed. The prospects for construction are presented. 9 refs., 12 figs., 2 tabs. (GHT)

Thiessen, H.A.

1985-01-01T23:59:59.000Z

211

FERC Proposal for Delegation of DOE Authority | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FERC Proposal for Delegation of DOE Authority FERC Proposal for Delegation of DOE Authority FERC Proposal for Delegation of DOE Authority September 9, 2011 - 1:00pm Addthis Proposed Siting Delegation to FERC The Department of Energy is considering whether to delegate to FERC its authorities related to the conduct of congestion studies and the designation of National Interest Electric Transmission Corridors. The rationale for this delegation, as seen by FERC, is presented in two documents prepared by FERC staff, Transmission Siting Narrative, and Transmission Siting Narrative Outline. These documents and further information on this issue are posted on the Transmission Congestion Studies website. To enable the Secretary to make a more informed decision, DOE sought comments from interested persons on the two FERC documents, including the

212

Proposed Evanston Offshore Wind Farm  

NLE Websites -- All DOE Office Websites (Extended Search)

Evanston Offshore Wind Farm Evanston Offshore Wind Farm August 1, 2011 Monday, August 1, 2011 Off Shore Wind Farm FAQ Document available from http://www.greenerevanston.org/ at the Renewable Energy Task Force tab Monday, August 1, 2011 City Manager Commits to City to sign onto Kyoto emissions reduction goals Wind Farm Timeline April 2006 Summer 2007 Fall 2008 February 2008 April 2010 March 2011 July 2011 Network for Evanston's Future proposes joint climate planning effort CGE Formed and Renewable Energy Task Force formed - Wind farm concept begun ECAP passed by City Council with 1st version of proposed Offshore Wind Farm included Offshore Wind Farm RFI unanimously passed by City Council Mayor Tisdahl appointments Committee on the Wind Farm City Council

213

DOE Proposes New Rules to Protect Trade Secrets and Confidential Business  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposes New Rules to Protect Trade Secrets and Confidential Proposes New Rules to Protect Trade Secrets and Confidential Business Information DOE Proposes New Rules to Protect Trade Secrets and Confidential Business Information March 8, 2011 - 5:26pm Addthis The Department of Energy today proposed to revise its rules to standardize how private parties applying for DOE assistance should submit trade secrets and other confidential business information. Currently, different DOE programs have different rules for how to submit such information. The confusion caused has made it difficult for the Department to respond promptly to Freedom of Information Act requests while meeting its obligations to protect confidential information. The proposed rules, modeled on procedures used by the Department's Advanced Technology Vehicles Manufacturing program, establish a standard practice asking

214

EIAs Proposed NGL Realignment Statement  

Gasoline and Diesel Fuel Update (EIA)

Statement 1 Statement 1 June 7, 2013 EIA's Proposed NGL Realignment Statement Over the past five years, liquids produced by natural gas processing plants (Natural Gas Plant Liquids, NGPL) and the gas liquids produced in refineries (Liquefied Refinery Gases, LRG) have increased by more than 20 percent. These increases resulted from the development of shale gas and tight oil, as well as growth in production of liquids-rich natural gas, driven by relatively high oil prices. This growth in supply of NGPL and LRG has focused attention on the use of market terms such as natural gas liquids (NGL) and liquefied petroleum gases (LPG). In a recent review of these terms and more than a dozen related definitions, the Energy Information Administration (EIA) found a

215

REQUEST FOR PROPOSALS RENEWABLE ENERGY CERTIFICATES  

NLE Websites -- All DOE Office Websites (Extended Search)

5, 2005 5, 2005 REQUEST FOR PROPOSALS RENEWABLE ENERGY CERTIFICATES Issued by: World Resources Institute on behalf of corporate partners in the GREEN POWER MARKET DEVELOPMENT GROUP BACKGROUND Convened in 2000 by the World Resources Institute, the Green Power Market Development Group is a unique commercial and industrial partnership dedicated to building corporate markets for green power. The Group is transforming energy markets to enable corporate buyers to diversify their energy portfolios and reduce their impact on climate change. Group partners are Alcoa Inc., Delphi Corporation, the Dow Chemical Company, DuPont, FedEx Kinko's, General Motors, IBM, Interface, Johnson & Johnson, NatureWorks LLC, Pitney Bowes, Staples, and Starbucks Coffee Company. More information is available at

216

Proposed Strategy to meet DOE Order 231  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Page 1 Page 1 Proposed Strategy to meet DOE Order 231.1B, Preparation of Annual Site Environmental Reports Background The U.S. Department of Energy Office (DOE) of Legacy Management (LM) was established in 2003 to manage the Department's post-closure responsibilities at sites under LM's care and ensure the future protection of human health and the environment at those sites. The histories of the legacy sites vary, as does the regulatory regime under which the sites are managed. Long- term surveillance plans (LTSPs) are prepared for the majority of the sites. These LTSPs, which are available to the public, include site descriptions, information about site history, nature and extent of contamination, institutional controls, closeout condition of the site, present and future

217

Restructuring proposed for Mexico's Pemex  

SciTech Connect

Mexican President Carlos Salinas de Gortari soon will send a legislative proposal to Congress that splits state owned Petroleos Mexicanos into four subsidiaries. This paper reports that Pemex functions will be divided into Pemex Exploration Production, Pemex Refining, Pemex Gas Basic Petrochemicals, and Pemex Secondary Chemicals. An earlier report the the company would be split into seven units. Each of the four new operating companies will be an independent business unit with a separate board of directors and its own staff and support functions.

Not Available

1992-06-22T23:59:59.000Z

218

Riverland expedited response action proposal  

SciTech Connect

The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Riverland Railroad Car Wash Pit and the 600 Area Army Munitions Burial Site. A non-time-critical ERA proposal includes preparation of an engineering evaluation/cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA proposal will undergo reviews by Westinghouse Hanford Company (WHC), DOE, EPA, Ecology, and the public. Ecology and EPA will issue an Action Agreement Memorandum after resolution of all review comments. The, memorandum will authorize remediation activities. The ERA goal is to reduce the potential for any contaminant migration to the soil column, groundwater, and Columbia River. The ERA may be the final remediation of the 100-IU-1 Operable Unit. A No Action Record of Decision may be issued after cleanup completion.

Not Available

1993-04-01T23:59:59.000Z

219

Metric adjusted skew information  

E-Print Network (OSTI)

We extend the concept of Wigner-Yanase-Dyson skew information to something we call ``metric adjusted skew information'' (of a state with respect to a conserved observable). This ``skew information'' is intended to be a non-negative quantity bounded by the variance (of an observable in a state) that vanishes for observables commuting with the state. We show that the skew information is a convex function on the manifold of states. It also satisfies other requirements, proposed by Wigner and Yanase, for an effective measure-of-information content of a state relative to a conserved observable. We establish a connection between the geometrical formulation of quantum statistics as proposed by Chentsov and Morozova and measures of quantum information as introduced by Wigner and Yanase and extended in this article. We show that the set of normalized Morozova-Chentsov functions describing the possible quantum statistics is a Bauer simplex and determine its extreme points. We determine a particularly simple skew information, the ``lambda-skew information,'' parametrized by a lambda in (0,1], and show that the convex cone this family generates coincides with the set of all metric adjusted skew informations. Key words: Skew information, convexity, monotone metric, Morozova-Chentsov function, lambda-skew information.

Frank Hansen

2006-07-23T23:59:59.000Z

220

Michigan Apple Committee 2013/14 Request for Proposals  

E-Print Network (OSTI)

1 Michigan Apple Committee 2013/14 Request for Proposals The Michigan Apple Committee (MAC the profitability of apple growing through improving production information and techniques; developing new markets that helps achieve this mission. In keeping with the spirit of the MAC's mission, the Michigan Apple Research

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Michigan Apple Committee 2014/15 Request for Proposals  

E-Print Network (OSTI)

1 Michigan Apple Committee 2014/15 Request for Proposals The Michigan Apple Committee (MAC the profitability of apple growing through improving production information and techniques; developing new markets subcommittee established the following as its charter in early 2009: To help the Michigan Apple Committee

Douches, David S.

222

Michigan Apple Committee 2012/13 Request for Proposals  

E-Print Network (OSTI)

Michigan Apple Committee 2012/13 Request for Proposals The Michigan Apple Committee (MAC) announces of apple growing through improving production information and techniques; developing new markets and new achieve this mission. In keeping with the spirit of the MAC's mission, the Michigan Apple Research

223

DOE Response to comments regarding U.S. Department of Energy Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Response to comments regarding U.S. Department of Energy DOE Response to comments regarding U.S. Department of Energy Proposed Agency Information Collection Request, May 25, 2010 DOE Response to comments regarding U.S. Department of Energy Proposed Agency Information Collection Request, May 25, 2010 DOE Response to comments regarding U.S. Department of Energy Proposed Agency Information Collection Request. The DOE shares your commitment to providing taxpayers and the public with timely reporting on the progress of Recovery Act projects. DOE Response to comments regarding U.S. Department of Energy Proposed Agency Information Collection Request, May 25, 2010 More Documents & Publications Comments regarding U.S. Department of Energy Proposed Agency Information Collection Request, Federal Register/Vol. 75, No. 100, Tuesday, May 25,

224

Proposal Submittal and Scheduling Procedures for Macromolecular...  

NLE Websites -- All DOE Office Websites (Extended Search)

obtained by submitting an SSRL Macromolecular Crystallography Proposal. This proposal is peer reviewed by the Structural Molecular Biology and Biophysics subpanel of the SSRL...

225

Proposal Submittal and Scheduling Procedures for Macromolecular  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Submittal and Scheduling Procedures for Macromolecular Proposal Submittal and Scheduling Procedures for Macromolecular Crystallography Beam time for macromolecular crystallography projects is obtained by submitting an SSRL Macromolecular Crystallography Proposal. This proposal is peer reviewed by the Structural Molecular Biology and Biophysics subpanel of the SSRL Proposal Review Panel (PRP) for scientific merit and rating and for criticality of synchrotron radiation use. Proposal Forms New Proposal Request Form (note: you must be a registered user to submit a proposal through our User Portal. Click on "Become a New User" link to register.) Extension Application for Macromolecular Crystallography Proposals Rapid Access Application Form Types of Proposals Proposals should be submitted under one of the following classifications.

226

JGI - How to Propose a CSP Project  

NLE Websites -- All DOE Office Websites (Extended Search)

How to Propose a CSP Project How to Propose a CSP Project CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ How do I submit my proposal? Proposals for synthetic biology and small-scale microbial and metagenome projects may be submitted at any time as brief white papers and will be reviewed every six months. Deadline for submission is 60 days prior to the review. See proposal schedule for specific dates. Submit a small-scale microbial/metagenome or synthetic biology proposal For the CSP15 annual call, a letter of intent is required to submit a proposal to JGI. Submitters whose letters of intent/proposals are approved will receive further instructions via email. Submit a CSP annual proposal For the CSP15 JGI-EMSL joint call, a letter of intent is required to submit

227

Sampling-based robotic information gathering algorithms  

Science Journals Connector (OSTI)

We propose three sampling-based motion planning algorithms for generating informative mobile robot trajectories. The goal is to find a trajectory that maximizes an information quality metric (e.g. variance reduction, information gain, or mutual information) ... Keywords: Motion and path planning, field robotics, robotic information gathering

Geoffrey A. Hollinger, Gaurav S. Sukhatme

2014-08-01T23:59:59.000Z

228

REQUEST FOR PROPOSALS FOR RENEWABLE ENERGY GENERATION (WIND AND SOLAR ONLY) FOR JEA JACKSONVILLE, FLORIDA  

NLE Websites -- All DOE Office Websites (Extended Search)

REQUEST FOR PROPOSALS FOR REQUEST FOR PROPOSALS FOR RENEWABLE ENERGY GENERATION (WIND AND SOLAR ONLY) FOR JEA JACKSONVILLE, FLORIDA MARCH 17, 2008 (RELEASED) MAY 16, 2008 (DUE DATE) 3/17/2008 1 TABLE OF CONTENTS TITLE SECTION REQUEST FOR PROPOSAL 1.0 INFORMATION AND INSTRUCTIONS TO BIDDERS I 2.0 PROPOSAL TECHNICAL AND PRICING REQUIREMENTS II 3.0 PROPOSAL TECHNICAL AND PRICING FORMS III 4.0 PROPOSAL TECHNICAL AND PRICING REQUIREMENTS AND IV FORMS (FOR SOLAR EQUIPMENT ONLY PROPOSALS) SUPPLEMENTAL FORMS: CONFLICT OF INTEREST FORM CONFIDENTIALITY AGREEMENT 3/17/2008 2 REQUEST FOR PROPOSALS SEALED PROPOSALS will be received for this RFP until: LOCAL TIME 5:00 PM DAY OF WEEK FRIDAY DATE MAY 16, 2008 Proposals must be received at the following address:

229

Information Cartography 1 Information Cartography  

E-Print Network (OSTI)

Information Cartography 1 Information Cartography · The use of Geographic Information Systems (GIS) to visualize non- geographic data · Utilizes Geographic Information Science to develop models and organize information--not an art form · Used to build information maps. Information maps consist of a landscape (base

Old, L. John

230

Information Solutions: Database Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Database Applications Database Applications Argonne DOE-BES Central User Facility: A-Z People Query Data Warehouse Edits Registration | Registration Processing Security Admin Beamline Component Database System to manage beamline components. Beamline Downtime Report - UES Floor coordinator's downtime entry and reporting system. Beamline Directory | Beamline Entry Administration Links to the beamline websites and to detailed information about the equipment, techniques and contact information of a beamline. Beamline Usage and Scheduling System Long term schedule query and edit. Beamline schedule query and edit. Watchman and PSS data. Budget Proposal System Allows user to submit budget proposals via the web. Beamline Statistics Menu Query, entry and reporting of beamline statistics for ALD use only.

231

Proposal Review Panel | Stanford Synchrotron Radiation Lightsource  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Review Panel Proposal Review Panel Submitting a proposal is the first step to access beam time at SSRL. Proposals are peer reviewed and rated by the SSRL Proposal Review Panel (PRP) on a scale from 1 (highest) to 5 (lowest). Successful proposals are eligble to request and may be awarded beam time on SSRL beam lines, with priority given to the highest rated proposals and those which demonstrate efficient and productive use of beam time. We have three proposal calls per year with one on-site PRP meeting at SSRL annually. Access Policy The work of the PRP is accomplished with four subpanels: BIO - The biology panel reviews proposals requesting beam time for imaging, X-ray spectroscopic studies, small-angle scattering experiments, and crystallography of biologically important samples.

232

NSR&D Call for Proposals 2015  

Energy.gov (U.S. Department of Energy (DOE))

The Call for Proposals memorandum represents the official 2015 Call for Proposals for the Department of Energy (DOE) Nuclear Safety Research and Development (NSR&D) Program. The purpose of the Call for Proposals is to identify potential projects addressing cross-cutting nuclear safety issues across the DOE complex. Also included are the Proposal Submittal Instructions and Review and Prioritization of Submitted Proposals. The latter document, which describes the criteria and process that the NSR&D Committee will use to evaluate proposals, is included to help delineate the types of potential projects that are of greatest interest to the NSR&D Program.

233

Notices DEPARTMENT OF ENERGY Energy Information Administration  

Annual Energy Outlook 2012 (EIA)

public comment on the proposed collection of information, Form EIA-63C, Densified Biomass Fuel Report, which EIA is developing for submission to the Office of Management and...

234

Call for Research Proposals January 13, 2011  

E-Print Network (OSTI)

should contact Prof. Jon Chase, Director (jchase@wustl.edu). For proposals focused on the Clean Coal

Subramanian, Venkat

235

Information theoretical characterization of turbulence  

Science Journals Connector (OSTI)

A method of describing turbulence in terms of dynamical connectivity in the wave-number space is proposed. The connectivity is quantified by the information theoretical quantities, i.e., mutual information and cross information flow rate. This method is applied to the analysis of two simple examples of turbulence in one spatial dimension. Although the examples have quite different physical origins, the information structures of the wave-number space turn out to be quite similar: The wave-number space consists of several regions generating information in different ways, and how information flows between these regions reflects the dynamical structure of turbulence.

K. Ikeda and K. Matsumoto

1989-05-08T23:59:59.000Z

236

Energy Department Requests Proposals for Advanced Scientific Computing  

Office of Science (SC) Website

Energy Energy Department Requests Proposals for Advanced Scientific Computing Research News Featured Articles Science Headlines 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Presentations & Testimony News Archives Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 12.27.05 Energy Department Requests Proposals for Advanced Scientific Computing Research Print Text Size: A A A Subscribe FeedbackShare Page WASHINGTON, DC - The Department of Energy's Office of Science and the National Nuclear Security Administration (NNSA) have issued a joint Request for Proposals for advanced scientific computing research. DOE expects to fund $67 million annually for three years to five years under its Scientific Discovery through Advanced Computing (SciDAC) research program.'

237

Management of corrective action wastes pursuant to proposed Subpart S  

SciTech Connect

Under Section 3004(u) of the Resource Conservation and Recovery Act (RCRA), owners/operators of permitted or interim status treatment, storage, and disposal facilities (TSDFs) are required to perform corrective action to address releases of hazardous waste or hazardous constituents from solid waste management units (SWMUs). On July 27, 1990, the Environmental Protection Agency (EPA) proposed specific corrective action requirements under Part 264, Subpart S of Title 40 of the code of Federal Regulations (CFR). One portion of this proposed rule, addressing requirements applicable to corrective action management units (CAMUs) and temporary units (TUs), was finalized on February 16, 1993 (58 FR 8658 et seq.). (CAMUs and TUs are RCRA waste management units that are specifically designated for the management of corrective action wastes). Portions of the proposed Subpart S rule that address processes for the investigation and cleanup of releases to environmental media have not yet been finalized. EPA and authorized State agencies, however, are currently using the investigation and cleanup procedures of the proposed rule as a framework for implementation of RCRA`s corrective action requirements. The performance of corrective action cleanup activities generates wastes that have to be characterized and managed in accordance with applicable RCRA requirements. This Information Brief describes these requirements. It is one of a series of information Briefs on RCRA Corrective Action.

Not Available

1995-02-01T23:59:59.000Z

238

ClimateSmart Loan Program: Proposal to Boulder County Board of Commissioners  

Energy.gov (U.S. Department of Energy (DOE))

Boulder County's proposal to its Board of Commissioners contains information about the background of the ClimateSmart Loan Program, outlines key elements of the program, and requests direction from the board on specific program design features.

239

Microsoft Word - EMSL Proposal Planning_FY2014.r2.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

EMSL user proposal requires a lot of detailed information for a thorough peer and management review. To aid in this process, we suggest you use this document to help you track the...

240

Information Science  

NLE Websites -- All DOE Office Websites (Extended Search)

Information Science Information Science1354608000000Information ScienceSome of these resources are LANL-only and will require Remote Access.NoQuestions? 667-5809library@lanl.gov...

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Utility-based Information Distillation Over Temporally Sequenced Documents  

E-Print Network (OSTI)

Utility-based Information Distillation Over Temporally Sequenced Documents Yiming Yang Language to information distil- lation over temporally ordered documents, and proposes a novel evaluation scheme, flexible user feedback, evaluation methodology. 1. INTRODUCTION Tracking new and relevant information from

Murphy, Robert F.

242

Guide for the Submission of Unsolicited Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

GUIDE FOR THE SUBMISSION OF GUIDE FOR THE SUBMISSION OF UNSOLICITED PROPOSALS The National Energy Technology Laboratory (NETL), Pittsburgh Office has operational responsibility of the DOE Unsolicited Proposal (USP) Program. All unsolicited proposals should be forwarded by Email to John N. Augustine at DOEUSP@NETL.DOE.GOV who will serve as the single point of contact for all Department of Energy (DOE) unsolicited proposals. Please direct all unsolicited proposals, abstracts and correspondence to: John N. Augustine, Mail Stop 921-107 Unsolicited Proposal Manager U.S. Department of Energy National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236-0940 Email: DOEUSP@NETL.DOE.GOV -1- TABLE OF CONTENTS Page Introduction .................................................................................................................................... 3

243

University Park STEP-UP Proposal  

Energy.gov (U.S. Department of Energy (DOE))

University Park STEP-UP Proposal: DE-FOA-0000148, from the Tool Kit Framework: Small Town University Energy Program (STEP).

244

Lutron Electronics: Proposed Penalty (2012-SE-3796)  

Energy.gov (U.S. Department of Energy (DOE))

DOE alleged in a Notice of Proposed Civil Penalty that Lutron Electronics Co., Inc. manufactured and distributed noncompliant class A external power supplies in the U.S.

245

Reducing Emissions Through Sustainable Transport: Proposal for...  

Open Energy Info (EERE)

Through Sustainable Transport: Proposal for a Sectoral Approach Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Reducing Emissions Through Sustainable Transport:...

246

Heat Controller: Proposed Penalty (2014-SE-15004)  

Energy.gov (U.S. Department of Energy (DOE))

DOE alleged in a Notice of Proposed Civil Penalty that Heat Controller, Inc. privately labeled and distributed noncompliant room air conditioners in the U.S.

247

Proposal Submittal and Scheduling Procedures Entry Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Submittal and Scheduling Procedures for Research at SSRL X-rayVUV Macromolecular Crystallography SSRL is funded by the Department of Energy, Office of Basic Energy...

248

Whirlpool: Proposed Penalty (2013-SE-1420)  

Energy.gov (U.S. Department of Energy (DOE))

DOE alleged in a Notice of Proposed Civil Penalty that Whirlpool Corporation manufactured and distributed noncompliant refrigerator-freezers in the U.S.

249

Categorical Exclusion Determination Form Proposed Action Title...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

can be regenerated electrically for use in future high efficiency electric vehicle (EV) heat pumps. Proposed work consists of indoor laboratory-based research and development,...

250

2013 Reinvention Fund Request for Proposals 1 2013 Reinvention Fund: Request for Proposals  

E-Print Network (OSTI)

2013 Reinvention Fund Request for Proposals 1 2013 Reinvention Fund: Request for Proposals Building a Living Laboratory for Sustainability at Penn State Reinvention Fund Projects Pre-Proposals Due: October 21, 2013 Full Proposals Due: December 20, 2013 Student Sustainability Innovation Projects Pre

Maranas, Costas

251

Information Technology Management ((Information Security))  

Energy.gov (U.S. Department of Energy (DOE))

A successful candidate in this position will serve as an Information Technology Specialist (Information Security) with responsibility for the implementation of a wide range of technically complex...

252

INFORMATION & COMMUNICATION  

E-Print Network (OSTI)

of information and communication technologies in development that draws on Amartya Sen's capabilities approach

Jackson, Daniel

253

Review of heavy ion collider proposals  

SciTech Connect

In this paper we review proposals for heavy-ion colliders generated during the last few years for several national laboratories. The proposals span over a large range of energy and luminosity to accommodate the experimental needs of both the nuclear and the high-energy physicists. We report also briefly efforts in the same field happening in Europe.

Ruggiero, A.G.

1985-01-01T23:59:59.000Z

254

Proposal/Grant Writing: Planning, Writing, Reviewing  

E-Print Network (OSTI)

Proposal/Grant Writing: Planning, Writing, Reviewing December 7th, 2010 #12;Presentation Overview ·General Proposal Writing Planning for success Writing Reviewing ·Specifics for non-governmental funding agencies ·Resources available at Michigan Tech to help you 2 #12;Planning 3 #12;Larger Context ·Research

255

Proposal for the Cryogenic Supply of a  

E-Print Network (OSTI)

1 Proposal for the Cryogenic Supply of a Single TTF / FEL - Cryomodule Test Bench TESLA Report No for the test of single TTF/FEL-cryomodules is proposed. The general equipment and the layout of the cryogenic the necessity of experimental investigations of fault conditions for TESLA cryogenic components in line

256

Proposal Preparation at a Glance Planning Ahead  

E-Print Network (OSTI)

I Need to Provide to ORA? 1. A budget in the standard CSM format. Use our template at http://inside.minesProposal Preparation at a Glance Planning Ahead Indirect Cost Exceptions Read your proposal website at: http://inside.mines.edu/Research_Administration under "What's New." Cost Sharing

257

CONTACTS FOR INFORMATION MANAGEMENT: Forms, Information Collection...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONTACTS FOR INFORMATION MANAGEMENT: Forms, Information Collection (PRA), & Records CONTACTS FOR INFORMATION MANAGEMENT: Forms, Information Collection (PRA), & Records Name Contact...

258

NETL: Guide for Preparation of Cost Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

and Business Opportunities and Business Opportunities Guide for Preparation of Cost Proposals The following guide is to be used in the preparation of the offeror's cost proposal. It provides general instructions as well as the format, exhibits and content that is required to be included in the submission. In addition, the exhibits include examples of both cost elements and indirect rate data that are in typical proposals. Please note that these are provided as a guide only. Do not attempt to conform your proposal to match the exact elements and accounts in the examples. Both the cost elements and indirect rate data in your proposal should be able to be traced to and supported by your accounting system. Any questions should be directed to the contact person noted in the instructions.

259

Microsoft Word - Call_for_Proposals.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

The University of Chicago The University of Chicago ATLAS Call for Proposals Deadline for proposals: Monday, October 28, 2013 Dear ATLAS User, This is a call for proposals for experiments at ATLAS, for the scheduling period beginning in January 2014. The ATLAS Program Advisory Committee (PAC) meeting will be held November 22-23, 2013. Please note that this is a call for proposals for all experiments using stable beams, radioactive beams produced by the in-flight technique, and low-energy and reaccelerated radioactive beams from the CARIBU source. This is also the first call for proposals for experiments with the GRETINA gamma-ray tracking array that will be operational at ATLAS from January 2014 to December 2014. GRETINA operation at ATLAS is expected to be split into two campaigns. GRETINA's first campaign at ATLAS will have it sited on the

260

Comment on Spacetime information  

Science Journals Connector (OSTI)

A recent paper by Hartle [Phys. Rev. D 51, 1800 (1995)] proposes a definition of spacetime information the information available about a quantum systems boundary conditions in the various sets of decohering histories it may display and investigates its properties. We note here that Hartles analysis contains errors which invalidate several of the conclusions. In particular, the proof that the proposed definition agrees with the standard definition for ordinary quantum mechanics is invalid, the evaluations of the spacetime information for time-neutral generalized quantum theories and for generalized quantum theories with nonunitary evolution are incorrect, and the argument that spacetime information is conserved on spacelike surfaces in these last theories is erroneous. We show, however, that the proposed definition does, in fact, agree with the standard definition for ordinary quantum mechanics. Hartles definition relies on choosing, case by case, a class of fine-grained consistent sets of histories. We supply a possible general definition of a class of sets that includes all the sets considered in Hartles paper and that generalizes to other cases.

Adrian Kent

1997-08-15T23:59:59.000Z

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

China Information Service Offered  

NLE Websites -- All DOE Office Websites (Extended Search)

China Information Service Offered China Information Service Offered The Energy Analysis Program is proposing to launch a multiclient service, tentatively called the China Energy Information Service, that would draw upon EAP's extensive research on China's energy sector and its strong working relationships with Chinese policymakers and researchers. The service would provide private U.S. firms with the information they need to market their energy-related products, technologies, and services in China. For an annual fee of less than $15,000, participants would be entitled to: Annual updates of EAP's China Databook covering China's energy supply, use, investment, and other related statistics. Bimonthly topical reports on subjects to be chosen in consultation with advisory committees composed of the service's subscribers.

262

Chief Information Officer Chairman, Information  

E-Print Network (OSTI)

Chief Information Officer Chairman, Information Technology Division Cleveland Clinic C. Martin Harris, MD, MBA C. Martin Harris, M.D., M.B.A., is the Chief Information Officer and Chairman of the Information Technology Division of Cleveland Clinic in Cleveland, Ohio. Dr. Harris' interest and expertise

Loudon, Catherine

263

Freedom of Information Act Information  

E-Print Network (OSTI)

Freedom of Information Act 2000 Information Request Form Reference no of request Please read the guidance accompanying this form and refer to the University's Freedom of Information publication scheme (http://www.admin.cam.ac.uk/univ/information/foi/foi_publication_scheme.pdf) before making

Talbot, James P.

264

Notice of Proposed Rulemaking: Federal Register Notice Volume 76, No. 239  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Rulemaking: Federal Register Notice Volume 76, Proposed Rulemaking: Federal Register Notice Volume 76, No. 239 - Dec. 13, 2011 Notice of Proposed Rulemaking: Federal Register Notice Volume 76, No. 239 - Dec. 13, 2011 The Department of Energy proposes to amend its regulations for the timely coordination of Federal authorizations for proposed interstate electric transmission facilities pursuant to section 216(h) of the Federal Power Act (FPA). The proposed rule would require permitting entities to inform DOE of requests for authorizations required under Federal law for Qualifying Projects as defined in the rule, as well as establish a process whereby applicants for Federal authorizations for interstate electric transmission facilities that are not Qualifying Projects can request DOE assistance in the Federal authorization process. Also, the proposed rule provides for the

265

http://www.oha.doe.gov/regs/Proposed708.htm  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

[6450.01P] [6450.01P] DEPARTMENT OF ENERGY 10 CFR PART 708 [RIN 1901-AA78] Criteria and Procedures for DOE Contractor Employee Protection Program AGENCY: Department of Energy ACTION: Notice of proposed rulemaking SUMMARY: The Department of Energy (DOE) proposes amendments for its contractor employee protection program which provides recourse to DOE contractor employees who believe they have been retaliated against for activities such as a disclosure of information regarding management of environmental, safety, health, and other matters, for participating in Congressional proceedings, or for refusing to engage in illegal or dangerous activities. DATES: Written comments should be forwarded not later than ____________ [insert the date 60 days from date of this FR

266

New Technique for Proposing Network's Topology using GPS and GIS  

E-Print Network (OSTI)

The problem of proposed topology for network comes when using Prim's algorithm with default distance (unrealistic distances) between network's nodes and don't care about the lakes, high hills, buildings, etc. This problem will cause incorrect estimations for cost (budget) of requirements like the media (optic fibre) and the number or type of Access-points, regenerator, Optic Amplifier, etc. This paper proposed a new technique of implementing Prim's algorithm to obtain realistic topology using realistic distances between network's nodes via Global Positioning System GPS and Geographic Information Systems GIS packages. Applying the new technique on academic institutes network of Erbil city from view of media (optic fibre) shows that there is disability in cost (budget) of the media which is needed (nearly) 4 times if implement default Prim's algorithm (don't using GPS & GIS) base on unrealistic distances between the nodes.

Ismaeel, Ayad Ghany

2012-01-01T23:59:59.000Z

267

Grid Security Loopholes with Proposed Countermeasures  

Science Journals Connector (OSTI)

Grid computing is an emergent computing innovation which ... to research on attribute based access control for grid computing, security mechanism to authorize and authenticate users, before accessing information ...

Nureni Ayofe Azeez; Tiko Iyamu; Isabella M. Venter

2012-01-01T23:59:59.000Z

268

Request for Proposal | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Request for Proposal | National Nuclear Security Administration Request for Proposal | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Request for Proposal Home > About Us > Our Operations > Acquisition and Project Management > Major Contract Solicitations > Environmental Program Services Contract >

269

Information and entropy  

Science Journals Connector (OSTI)

The Landauer cost for erasing information demands that information about a physical system be included in the total entropy, as proposed by Zurek [Nature 341, 119 (1989); Phys. Rev. A 40, 4731 (1989)]. A consequence is that most system stateseither classical phase-space distributions or quantum pure stateshave total entropy much larger than thermal equilibrium. If total entropy is to be a useful concept, this must imply that work can be extracted in going from equilibrium to a typical system state. The work comes from randomization of a memory that holds a record of the system state.

Carlton M. Caves

1993-06-01T23:59:59.000Z

270

Financial Engineering Proposal Department of Agricultural Economics  

E-Print Network (OSTI)

Financial Engineering Proposal Department of Agricultural Economics and Economics and Department engineering is a multidisciplinary field that emphasizes the engineering of new financial economic instruments the Department of Mechanical and Industrial Engineering and the Department of Agricultural Economics

Lawrence, Rick L.

271

Princeton Plasma Physics Laboratory NSTX Experimental Proposal  

E-Print Network (OSTI)

in a "fixed wall" device is key for management of plasma-wall (i.e., divertor) interactions. In particular-H transition. The early times after this transition being generally blob-less. The proposed experiment intends

Princeton Plasma Physics Laboratory

272

ARRA Proposed Award: Energy Technology Assistance Program  

E-Print Network (OSTI)

ARRA Proposed Award: Energy Technology Assistance Program Statewide Program ­ covering Greater Sub contractors: California Lighting Technology Center California Labor Management Cooperation multiplier) Partnering Clean Energy Workforce Training Programs: Sacramento Employment Training Agency

273

EMSL Research and Capability Development Proposals Cryogenic...  

NLE Websites -- All DOE Office Websites (Extended Search)

Mn(IV,IV) dimer acquired at 9.4 T. EMSL Research and Capability Development Proposals Cryogenic NMR and Advanced Electronic Structure Theory as a Unique EMSL Capability for Complex...

274

ACS workshop in India proposes eight projects  

Science Journals Connector (OSTI)

ACS workshop in India proposes eight projects ... Investigate the solid-state chemistry of processes and materials needed for using solar energy to split water and for transporting and storing the resulting hydrogen for use as a fuel. ...

1980-03-31T23:59:59.000Z

275

Refrigerator Manufacturers: Proposed Penalty (2013-CE-5341)  

Energy.gov (U.S. Department of Energy (DOE))

DOE alleged in a Notice of Proposed Civil Penalty that Refrigerator Manufacturers, LLC failed to certify a variety of walk-in cooler or freezer components as compliant with the applicable energy conservation standards.

276

Cospolich Refrigerator: Proposed Penalty (2013-CE-5314)  

Energy.gov (U.S. Department of Energy (DOE))

DOE alleged in a Notice of Proposed Civil Penalty that Cospolich Refrigerator Co, Inc. failed to certify walk-in cooler or freezer components as compliant with the energy conservation standards.

277

Polar King: Proposed Penalty (2013-CE-5328)  

Energy.gov (U.S. Department of Energy (DOE))

DOE alleged in a Notice of Proposed Civil Penalty that Polar King International Inc. failed to certify a variety of walk-in cooler or freezer components as compliant with the applicable energy conservation standards.

278

March 17, 2011 Pennsylvania's Proposed Budget  

E-Print Network (OSTI)

Exchange March 17, 2011 1 Pennsylvania's Proposed Budget On Tuesday, March 8, Governor Corbett March 17, 2011 2 addition, the COT voted to increase fees for undergraduates by 3.2 percent, a $26

Hardy, Christopher R.

279

Environmental impacts of proposed Monitored Retrievable Storage  

SciTech Connect

This report describes environmental impacts from a proposed monitored retrievable storage facility for spent fuels to be located in Tennessee. Areas investigated include: water supply, ground water, air quality, solid waste management, and health hazards. (CBS)

Not Available

1985-12-17T23:59:59.000Z

280

California Energy Commission PROPOSED AMENDED STANDARDS  

E-Print Network (OSTI)

California Energy Commission PROPOSED AMENDED STANDARDS NONRESIDENTIAL ACCEPTANCE TESTING ENERGY COMMISSION Martha Brook Project Manager & Principal Author Eurlyne Geiszler Staff members of the California Energy Commission prepared this report. As such, it does not necessarily

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

BPA's Proposed Oversupply Management Protocol Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

M I N I S T R A T I O N BPA's Proposed Oversupply Management Protocol February 14, 2012 BPA Rates Hearing Room To participate by phone please call (888) 296-1938 and enter 563088...

282

BPA proposes rate increase to bolster  

NLE Websites -- All DOE Office Websites (Extended Search)

RELEASE Thursday, Nov. 8, 2012 CONTACT: Mike Hansen, 503-230-4328 or 503-230-5131 BPA proposes rate increase to bolster federal power and transmission systems Portland, Ore....

283

Princeton Plasma Physics Laboratory NSTX Experimental Proposal  

E-Print Network (OSTI)

and that this may effect the energy confinement time as well as provide current drive. Of course, other effects mayPrinceton Plasma Physics Laboratory NSTX Experimental Proposal Title: CHI into an ohmic discharge

Princeton Plasma Physics Laboratory

284

Commercial Cooler: Proposed Penalty (2013-CE-5343)  

Energy.gov (U.S. Department of Energy (DOE))

DOE alleged in a Notice of Proposed Civil Penalty that Commercial Cooler, Inc. failed to certify a variety of walk-in cooler or freezer components as compliant with the applicable energy conservation standards.

285

Proposal for a High Energy Nuclear Database  

E-Print Network (OSTI)

Proposal for a High Energy Nuclear Database David A. Brown 1it requires the high-energy nuclear physics com- munitys ?compilations of high-energy nuclear data for applications

Brown, David A.; Vogt, Ramona

2005-01-01T23:59:59.000Z

286

Proposed Project: Plains & Eastern Clean Line  

Energy.gov (U.S. Department of Energy (DOE))

On June 10, 2010, the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In response, Clean Line Energy Partners, LLC submitted an application for its Plains & Eastern Clean Line project. DOE has concluded that Clean Lines proposal was responsive to the RFP, and it is currently under consideration.

287

Information Accountability  

E-Print Network (OSTI)

Ease of information flow is both the boon and the bane of large-scale, decentralized systems like the World Wide Web. For all the benefits and opportunities brought by the information revolution, with that same revolution ...

Weitzner, Daniel J.

2007-06-13T23:59:59.000Z

288

Green Fund Proposal Guidelines September 15, 2010 UNBC GREEN FUND PROPOSAL GUIDELINES  

E-Print Network (OSTI)

Green Fund Proposal Guidelines September 15, 2010 UNBC GREEN FUND PROPOSAL GUIDELINES In order to advance the overall sustainability of UNBC as an institution a "UNBC Green Fund" has been created from UNBC parking revenues. Green research and project proposals will be accepted by the Green University

Northern British Columbia, University of

289

Green Fund Proposal Guidelines August 10, 2012 UNBC GREEN FUND PROPOSAL GUIDELINES  

E-Print Network (OSTI)

Green Fund Proposal Guidelines August 10, 2012 UNBC GREEN FUND PROPOSAL GUIDELINES In order to advance the overall sustainability of UNBC as an institution a "UNBC Green Fund" has been created from UNBC parking revenues. Green research and project proposals are accepted by the Green University

Northern British Columbia, University of

290

Green Fund Proposal Guidelines March 15, 2010 UNBC GREEN FUND PROPOSAL GUIDELINES  

E-Print Network (OSTI)

Green Fund Proposal Guidelines March 15, 2010 UNBC GREEN FUND PROPOSAL GUIDELINES In order to advance the overall sustainability of UNBC as an institution a "UNBC Green Fund" has been created from UNBC parking revenues. Green research and project proposals will be accepted by the Green University

Northern British Columbia, University of

291

Information gain in quantum continual measurements  

E-Print Network (OSTI)

Inspired by works on information transmission through quantum channels, we propose the use of a couple of mutual entropies to quantify the efficiency of continual measurement schemes in extracting information on the measured quantum system. Properties of these measures of information are studied and bounds on them are derived.

Albert Barchielli; Giancarlo Lupieri

2006-12-01T23:59:59.000Z

292

Concentrating Information  

E-Print Network (OSTI)

We introduce the concentrated information of tripartite quantum states. For three parties Alice, Bob and Charlie, it is defined as the maximal mutual information achievable between Alice and Charlie via local operations and classical communication performed by Charlie and Bob. The gap between classical and quantum concentrated information is shown to be an operational figure of merit for a state merging protocol involving shared mixed states and no distributed entanglement. We derive upper and lower bounds on the concentrated information, and obtain a closed expression for arbitrary pure tripartite states in the asymptotic setting. In this situation, one-way classical communication is shown to be sufficient for optimal information concentration.

Alexander Streltsov; Soojoon Lee; Gerardo Adesso

2014-10-23T23:59:59.000Z

293

Information Handling: Keeping Chemists Informed  

Science Journals Connector (OSTI)

... be a member from the start, and the Office for Scientific and Technical Information (OSTI) will be represented by an observer. The objective is to provide a comprehensive information ...

1968-09-28T23:59:59.000Z

294

ContactInformation Contact Information  

E-Print Network (OSTI)

's only fully accredited institute of higher learning offering graduate education in the field of Steel Institute of Ferrous Technology(GIFT) Admissions Timeline Semester Begins Application Deadline September 1ContactInformation Contact Information For More Information We look forward to receiving your

Sung, Wokyung

295

Developing a Research Proposal | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Developing a Research Proposal Developing a Research Proposal Visiting Faculty Program (VFP) VFP Home Eligibility Benefits Participant Obligations How to Apply Selecting a Host DOE Laboratory Developing a Research Proposal Recommender Information Student Participants Submitting a Proposal to DOE Application Selection Process and Notification Key Dates Frequently Asked Questions Contact WDTS Home How to Apply Developing a Research Proposal Print Text Size: A A A RSS Feeds FeedbackShare Page Developing a Research Project and Required Proposal with a DOE Laboratory Prior to applying, eligible faculty are strongly encouraged to reach out to scientific or engineering staff at the DOE National Laboratory best aligned with their research interests, and work to co-develop a research project plan, which can help provide a basis for the required co-written

296

Call issued for Lujan Neutron Scattering Center proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Call issued for Lujan Neutron Scattering Center proposals Call issued for Lujan Neutron Scattering Center proposals The Lujan Neutron Scattering Center invites proposals addressing...

297

Proposed Data Elements for PARS II Web Application | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Data Elements for PARS II Web Application Proposed Data Elements for PARS II Web Application Proposed Data Elements for PARS II Web Application More Documents &...

298

Guide for Preparation of Contract Cost Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

NATIONAL ENERGY TECHNOLOGY LABORATORY NATIONAL ENERGY TECHNOLOGY LABORATORY 3610 Collins Ferry Road 626 Cochrans Mill Road P.O. Box 880 P.O. Box 10940, Morgantown, WV 26507-0880 Pittsburgh, PA 15236-0940 This guide is available on the Department of Energy, National Energy Technology Laboratory web site at: http://www.netl.doe.gov/business/index.html TABLE OF CONTENTS GENERAL INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rounding Off . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Format and Content of the Cost Proposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cost Proposal Preparation Assistance . . . . . . . . . . . . . . . . . . . . . . . . . . . .

299

information Conference  

Science Journals Connector (OSTI)

information Conference ... The 1958 International Conference on Scientific Information will be held in Washington, D. C, in November 1958. ... Since papers that are accepted must be printed and circulated to the participants not later than July 1958, it is urged that anyone interested in submitting a paper write to the secretariat immediately, at International Conference of Scientific Information, National Academy of Sciences, 2101 Constitution Ave., Washington 25, D. C. ...

1957-12-09T23:59:59.000Z

300

This paper proposes the National Library  

E-Print Network (OSTI)

into the library data. The overview image provides a global view of the overall search space, and the preview image and freely available for public use, at: http://www.nlm. nih.gov/. Keywords: Browsing, Digital Library, ImageUser ABSTRACT This paper proposes the National Library Controlled Overviews of an Image Library

Shneiderman, Ben

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Proposed Start Date: Title of Project  

E-Print Network (OSTI)

Proposed Start Date: Title of Project: 1 Department:Principal Investigator(s): 1. College: Phone/ Email: 5 6 7 8 Does project involve: Human subjects? No Yes VertebrateAnimals? No Yes Radioactive understand and agree to comply with the URI policies and procedures for misconduct, conflict of interest

Rhode Island, University of

302

HATCH PROJECT PROPOSAL OKLAHOMA AGRICULTURAL EXPERIMENT STATION  

E-Print Network (OSTI)

or Revised Project Procedures for initiating a new project or for revising an existing project entail: 1. Abstracting the essential features of the objective and procedures sections from the project outline for CRISHATCH PROJECT PROPOSAL OKLAHOMA AGRICULTURAL EXPERIMENT STATION USDA PROJECT OUTLINE DEVELOPMENT

Ghajar, Afshin J.

303

PROPOSED 2013 BUILDING ENERGY EFFICIENCY STANDARDS  

E-Print Network (OSTI)

PROPOSED 2013 BUILDING ENERGY EFFICIENCY STANDARDS Title 24, Part 6, and Associated400201200415 DAY #12;2013 Building Energy Efficiency Standards Page 1 NOTICE NOTICE This version of the 2013 Building Energy Efficiency Standards is a marked version; that is, it contains underlined or struck

304

Steam reformer study proposed by Battelle  

Science Journals Connector (OSTI)

Steam reformer study proposed by Battelle ... At a meeting held at Battelle's Columbus, Ohio, laboratories, D. B. Roach told representatives of 24 firms involved in various aspects of steam reforming that, though production of hydrogen through steam reforming has been a highly successful process, "increased plant size and more severe operating conditions have given rise to serious problems." ...

1969-01-13T23:59:59.000Z

305

Conservation Before Shortage Proposed Shortage Criteria for  

E-Print Network (OSTI)

Conservation Before Shortage Proposed Shortage Criteria for Colorado River Operations I. Background, projects that reservoir levels at Lake Powell could head quickly towards the minimum power pool continued development of water supplies in the Upper Basin will further shrink available supplies

306

Integrated Datasets (IDs) Wood/Bretherton proposal  

E-Print Network (OSTI)

Integrated Datasets (IDs) Wood/Bretherton proposal ID Rationale Space/Time scale; Location; Platforms Parameters Combined Drizzle Dataset (CD ID) Collocated precipitation, aerosol and cloud micro, precip. rate, cloud Cross- Section Dataset (XS-ID) Data on E-W cross- section along 20°S from coast

Wood, Robert

307

Princeton Plasma Physics Laboratory NSTX Experimental Proposal  

E-Print Network (OSTI)

Princeton Plasma Physics Laboratory NSTX Experimental Proposal Title: Dependence of ELM size Thermonuclear Experimental Reactor (ITER) have yielded a pedestal energy loss fraction between 5% and 20 with resonant magnetic perturbations2 or by access to small ELM regimes. Fig. 1 from reference1 , where

Princeton Plasma Physics Laboratory

308

Princeton Plasma Physics Laboratory NSTX Experimental Proposal  

E-Print Network (OSTI)

Princeton Plasma Physics Laboratory NSTX Experimental Proposal Title: Dependence of ELM size Projections1 of the energy loss from Type I ELMs for the International Thermonuclear Experimental Reactor perturbations2 or by access to small ELM regimes. Fig. 1 from reference1 , where extrapolation to ITER is done

Princeton Plasma Physics Laboratory

309

DRAFT PROPOSAL EPA-402R-10003  

E-Print Network (OSTI)

DRAFT PROPOSAL EPA-402R-10003 FEDERAL GUIDANCE REPORT NO. 14 Radiation Protection Guidance This document is Federal Guidance Report No. 14 (FGR 14), "Radiation Protection Guidance for4 Diagnostic Environmental Protection9 Agency (EPA) as part of Reorganization Plan No. 3 of 1970 (Dunn et al. 2012). Under

310

Technical information  

Annual Energy Outlook 2012 (EIA)

Home> Commercial Buildings Home> Technical Information > Estimation of Standard Errors Estimation of Standard Errors Sampling error is the difference between the survey estimate...

311

Vendor Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Vendors businessassetsimagesbusiness-icon.jpg Vendor Information As a premier national research and development laboratory, LANL seeks to do business with qualified companies...

312

Operations Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Standards BPA Operations Information (OPI) Transmission Services operates and plans for regional and national system needs. Transmission Services coordinates system operation and...

313

Ordering Information  

Gasoline and Diesel Fuel Update (EIA)

Federal, State, local, and foreign governments, EIA survey respondents, and the media. For further information, and for answers to questions on energy statistics, please...

314

Federal Agency Proposals | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Federal Agency Proposals Federal Agency Proposals Grants & Contracts Support Grants & Contracts Support Home About Organization Chart .pdf file (12KB) Jobs Grants/Contracts Differences Federal Agency Proposals Funding Opportunity Announcements (FOAs) DOE National Laboratory Announcements Grants Process Grants Policy and Guidance FAQs Resources Contract Information Contact Information Grants & Contracts Support U.S. Department of Energy SC-43/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: 301-903-2859 E: sc.grantsandcontracts@science.doe.gov About Federal Agency Proposals Print Text Size: A A A RSS Feeds FeedbackShare Page Federal Agency Submissions If a SC Funding Opportunity Announcement permits other Federal agencies or other Federal agency's Federally Funded Research and Development Center

315

Registration Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Registration Information Registration Information Registration Information Focusing on methods and computational tools used to help sequence, assemble, and finish genomes, including new sequencing technologies. Contact Chris Detter (505) 665-3024 Email Registration is limited to 150 participants so please register ASAP if you plan to attend. There is no deadline for registration. To register, please send an e-mail to Chris Detter with your contact information: Name Citizenship status. Institution information. Area(s) of specific interest. Do you plan to submit an abstract by March 30th? Within 48 hrs of registering you will be sent an e-mail confirmation number that you should include on your abstract if you are submitting one. To submit an abstract, please refer to the Abstract Submission guidelines.

316

Theory based ecology (OUP Book Proposal) Page 1 OUP BOOK PROPOSAL  

E-Print Network (OSTI)

Theory based ecology (OUP Book Proposal) Page 1 OUP BOOK PROPOSAL Theory based Ecology a Darwinian change) Loránd Eötvös University, Budapest Rationale More than ever before, ecology is in a challenging ecology on first principles or laws, many others question even the feasibility of a general ecological

Meszéna, Géza

317

Draft 2009 ISRP Programmatic Habitat Project Proposal 1 Programmatic Proposal for  

E-Print Network (OSTI)

assistance and review in recovery planning and in the development of regional monitoring and evaluation Proposer Yakama Nation Fisheries Resource Management Short Description Upper Columbia Habitat Restoration of supporting sustainable populations. Towards achieving this goal, the Yakama Nation proposes to begin

318

Goodman Manufacturing: Proposed Penalty (2012-CE-1509)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Company, Company, L.P. (room air conditioners) ) ) ) ) ) Case Number: 2012-CE-1509 NOTICE OF PROPOSED CIVIL PENALTY Date issued: July 9, 2012 Number of alleged violations: 2920 (365 days, 8 models) Maximum possible assessment: $584,000 Proposed civil penalty: $58,400 The U.S. Department of Energy ("DOE") Office of the General Counsel, Office of Enforcement, alleges that Goodman Manufacturing Company, L.P. ("Goodman") has violated certain provisions of the Energy Policy and Conservation Act, 42 U.S.C. § 6291 et seq. ("the Act"), and 10 C.F.R. § 429.12. Specifically, DOE alleges: I. Goodman has manufactured 1 a variety of Amana brand room air conditioners, including basic models PBC092EOOBXAA, PBC093EOOBXAA, PBCI22EOOBXAA,

319

Manitowoc Foodservice: Proposed Penalty (2012-CE-5309)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Manitowoc Foodservice Manitowoc Foodservice (walk-in coolers and walk-in freezers) ) ) ) ) ) Case Number: 2012-CE-5309 NOTICE OF PROPOSED CIVIL PENALTY Date issued: July 11, 2012 Number of alleged violations: 5 (285 days, 5 models) Maximum possible assessment: $285,000 Proposed civil penalty: $28,500 The U.S. Department of Energy ("DOE") Office of the General Counsel, Office of Enforcement, alleges that Manitowoc F oodservice has violated certain provisions of the Energy Policy and Conservation Act, 42 U.S.C. § 6291 et seq. ("the Act"), and 10 C.P.R.§ 429.12. Specifically, DOE alleges: 1. Manitowoc Foodservice has manufactured a variety of walk-in coolers and freezers (WICFs) and their components. 2. Manitowoc Foodservice has distributed for at least 285 days, and continues to distribute,

320

Sunpentown: Proposed Penalty (2012-CE-1505)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sunpentown International Inc. Sunpentown International Inc. (room air conditioners) ) ) ) ) ) Case Number: 2012-CE-1505 NOTICE OF PROPOSED CIVIL PENALTY Date issued: July 9, 2012 Number of alleged violations: 608 (152 days; 4 models) Maximum possible assessment: $121,600 Proposed civil penalty: $30,400 The U.S. Depatiment of Energy ("DOE") Office of the General Counsel, Office of Enforcement, alleges that Sunpentown International Inc. ("SPT") has violated cetiain provisions of the Energy Policy and Conservation Act, 42 U.S. C.§ 6291 et seq. ("the Act"), and 10 C.P.R.§ 429.12. Specifically, DOE alleges: 1. SPT has manufactured 1 a variety of room air conditioners, including basic models W A- 1811S, WA-1511S, WA-2211S and WA-2511S. 2. SPT has distributed for over 152 days, and continues to distribute, basic models W A-

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Electrolux: Proposed Penalty (2012-CE-1901)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electrolux North America Electrolux North America (dishwashers) ) ) ) ) ) Case Number: 2012-CE-1901 NOTICE OF PROPOSED CIVIL PENALTY Date issued: June 27,2012 Number of alleged violations: 768 (1 basic model; 768 days) Maximum possible assessment: $151,640 Proposed civil penalty: $15,164 The U.S. Department of Energy ("DOE") Office of the General Counsel, Office of Enforcement, alleges that Electrolux North America ("Electrolux") has violated certain provisions of the Energy Policy and Conservation Act, 42 U.S.C. § 6291 et seq. ("the Act"), and DOE's cetiification regulations. 1 Specifically, DOE alleges: 1. Electrolux manufactmes and has manufactmed a variety of dishwashers, including basic model EIDW 6305*** . 2 2. Basic model EIDW 6305*** is a "covered product" as defined in 10 C.P.R.§ 430.2.

322

International Refrigeration: Proposed Penalty (2012-CE-1510)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

International Refrigeration Products International Refrigeration Products (room air conditioners) ) ) ) ) ) Case Number: 2012-CE-1510 NOTICE OF PROPOSED CIVIL PENALTY Date issued: July 9, 2012 Number of alleged violations: 5475 (365 days, 15 models) Maximum possible assessment: $1,095,000 Proposed civil penalty: $109,500 The U.S. Department of Energy ("DOE") Office of the General Counsel, Office of Enforcement, alleges that International Refrigeration Products ("IRP") has violated cettain provisions of the Energy Policy and Conservation Act, 42 U.S.C. § 6291 et seq. ("the Act"), and 10 C.P.R. § 429.12. Specifically, DOE alleges: 1. IRP has manufactured 1 a variety of Sea Breeze brand room air conditioners, including basic models WA46YR, WA48YRX, WA410YRX, WA412YRX, WH418ZRX,

323

Royal Centurion: Proposed Penalty (2012-CE-3608)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Royal Centurion, Inc. Royal Centurion, Inc. ( dchum idifiers) ) ) ) ) ) Case Number: 2012-CE-3608 NOTICE OF PROPOSED CIVIL PENALTY Date issued: August 29, 2012 Number of alleged violations: 730 (2 basic models; 365 days) Maximum possible assessment: $146,000 Proposed civil penalty: $14,600 The U.S. Department of Energy ("DOE") Office of the General Counsel, Office of Enforcement, alleges that Royal Centurion, Inc. ("Royal Centurion") has violated certain provisions of the Energy Policy and Conservation Act, 42 U.S.C. § 6291 er seq. ("the Act"), and 10 C.P.R. § 429.12. Specifically, DOE alleges: 1. Royal Centurion has manufactured 1 a variety of dehumidifiers, including basic models BDH-550 and BDH-450. 2. Royal Centurion has distributed for at least 365 days/ and continues to distribute, basic

324

Absocold: Proposed Penalty (2010-CE-1212)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Absocold Corporation 1 Case Number: 201 0-CE- 12 12 Absocold Corporation 1 Case Number: 201 0-CE- 12 12 (Residential refrigerators, freezers, and refrigerator-freezers) ) 1 1 NOTICE OF PROPOSED CIVIL PENALTY Date issued: September 8,20 10 Number of alleged violations: 13 Maximum possible assessment: $749,000 Proposed civil penalty: $75,920 The Office of the General Counsel of the U.S. Department of Energy (DOE) alleges that Absocold Corporation violated certain provisions of the Energy Policy and Conservation Act, 42 U.S.C. 5 6201 et seq., 10 C.F.R. Part 430, or both. Specifically, DOE alleges: 3 1. Absocold Corporation manufactures or privately labels a variety of residential refrigerators, freezers, and refrigerator-freezers, which it offers for distribution in commerce in the United States of America, including models:

325

Proposed ILC Parameters T.O. Raubenheimer  

NLE Websites -- All DOE Office Websites (Extended Search)

-05-98 -05-98 Proposed ILC Parameters T.O. Raubenheimer and K. Yokoya Introduction In this note, we describe the proposed working parameter set for the KEK-SLAC ILC linear collider and discuss the reasons leading to the values listed; more ex- tensive discussion of the optimization process will be found in subsequent notes. The parameter set is listed in Table 1 and is compared with the JLC 3-97 parameters and the NLC ZDR parameters in Table 2. The new parameter set has an operating plane which ranges from low IP emittances and high luminosity (cases A) to large IP emittances and smaller luminosity (cases C). Over this range, the bunch charge, bunch length, and IP beta functions are varied, however, the parameters have been chosen so that the tolerances on the accelerating structures are roughly constant. The collider must be designed to operate over the entire parameter range. In all cases,

326

Proposal Review Panels (Areas Other Than Crystallography)  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Review Panels Proposal Review Panels High Pressure Instrumentation Imaging/ Microbeam Macromolecular Crystallography Scattering Applied Materials Stanislav Sinogeikin, Chair Tim Graber, Chair Patrick LaRiviere, Chair John Rose, Chair Robert Suter, Chair Ercan Alp Maria Baldini Bin Chen Przemyslaw Dera Lars Ehm Ravi Kumar Barbara Lavina Sang-Heon (Dan) Shim Heather Watson Keith Brister Wenjun Liu Darren Dale Matthew Ginder-Vogel Xiaojing Huang (guest) Tony Lanzirotti Lisa Miller Mark Pfeifer Martina Ralle Xianghui Xiao Hanfei Yan Arnon Lavie Anne Mulichak Armand Beaudoin Dillon Fong Dileep Singh Mike Toney Bob Von Dreele Scattering Condensed Matter Scattering Chem/Biol/Environ Small Angle Scattering (SAXS) Spectroscopy Structural Science Roy Clarke, Chair Lynda Soderholm, Chair Peter Jemian, Chair Mali Balasubramanian, Chair

327

R&D Proposal for the National Muon Acccelerator Program  

SciTech Connect

This document contains a description of a multi-year national R&D program aimed at completing a Design Feasibility Study (DFS) for a Muon Collider and, with international participation, a Reference Design Report (RDR) for a muon-based Neutrino Factory. It also includes the supporting component development and experimental efforts that will inform the design studies and permit an initial down-selection of candidate technologies for the ionization cooling and acceleration systems. We intend to carry out this plan with participants from the host national laboratory (Fermilab), those from collaborating U.S. national laboratories (ANL, BNL, Jlab, LBNL, and SNAL), and those from a number of other U.S. laboratories, universities, and SBIR companies. The R&D program that we propose will provide the HEP community with detailed information on future facilities based on intense beams of muons - the Muon Collider and the Neutrino Factory. We believe that these facilities offer the promise of extraordinary physics capabilities. The Muon Collider presents a powerful option to explore the energy frontier and the Neutrino Factory gives the opportunity to perform the most sensitive neutrino oscillation experiments possible, while also opening expanded avenues for the study of new physics in the neutrino sector. The synergy between the two facilities presents the opportunity for an extremely broad physics program and a unique pathway in accelerator facilities. Our work will give clear answers to the questions of expected capabilities and performance of these muon-based facilities, and will provide defensible ranges for their cost. This information, together with the physics insights gained from the next-generation neutrino and LHC experiments, will allow the HEP community to make well-informed decisions regarding the optimal choice of new facilities. We believe that this work is a critical part of any broad strategic program in accelerator R&D and, as the P5 panel has recently indicated, is essential for the long-term health of high-energy physics.

Not Available

2010-02-01T23:59:59.000Z

328

R&D PROPOSAL FOR THE NATIONAL MUON ACCELERATOR PROGRAM  

SciTech Connect

This document contains a description of a multi-year national R&D program aimed at completing a Design Feasibility Study (DFS) for a Muon Collider and, with international participation, a Reference Design Report (RDR) for a muon-based Neutrino Factory. It also includes the supporting component development and experimental efforts that will inform the design studies and permit an initial down-selection of candidate technologies for the ionization cooling and acceleration systems. We intend to carry out this plan with participants from the host national laboratory (Fermilab), those from collaborating U.S. national laboratories (ANL, BNL, Jlab, LBNL, and SNAL), and those from a number of other U.S. laboratories, universities, and SBIR companies. The R&D program that we propose will provide the HEP community with detailed information on future facilities based on intense beams of muons--the Muon Collider and the Neutrino Factory. We believe that these facilities offer the promise of extraordinary physics capabilities. The Muon Collider presents a powerful option to explore the energy frontier and the Neutrino Factory gives the opportunity to perform the most sensitive neutrino oscillation experiments possible, while also opening expanded avenues for the study of new physics in the neutrino sector. The synergy between the two facilities presents the opportunity for an extremely broad physics program and a unique pathway in accelerator facilities. Our work will give clear answers to the questions of expected capabilities and performance of these muon-based facilities, and will provide defensible ranges for their cost. This information, together with the physics insights gained from the next-generation neutrino and LHC experiments, will allow the HEP community to make well-informed decisions regarding the optimal choice of new facilities. We believe that this work is a critical part of any broad strategic program in accelerator R&D and, as the P5 panel has recently indicated, is essential for the long-term health of high-energy physics.

Muon Accelerator Program; Zisman, Michael S.; Geer, Stephen

2010-02-24T23:59:59.000Z

329

Federal nuclear waste cleanup plan proposed  

Science Journals Connector (OSTI)

Federal nuclear waste cleanup plan proposed ... The Department of Energy has asked Congress to find $19.5 billion over the next five years to finance initial cleanup of environmental contamination at its nuclear, primarily weapons, facilities. ... DOE estimates that to begin implementing the plan in 1990, it needs considerably more than the $1.3 billion originally requested for defense waste and environmental restoration activities. ...

JANICE LONG

1989-08-07T23:59:59.000Z

330

Improvement of Information Rough Communication on Rough Set  

Science Journals Connector (OSTI)

The concept of information rough communication based on knowledge base is proposed by Mousavi Amin, Jabedar-Maralani Parviz. In this paper, its limitation is discussed. The concept of information rough communi...

QinLi An

2011-01-01T23:59:59.000Z

331

Spacetime information  

Science Journals Connector (OSTI)

In usual quantum theory, the information available about a quantum system is defined in terms of the density matrix describing it on a spacelike surface. This definition must be generalized for extensions of quantum theory which neither require, nor always permit, a notion of state on a spacelike surface. In particular, it must be generalized for the generalized quantum theories appropriate when spacetime geometry fluctuates quantum mechanically or when geometry is fixed but not foliable by spacelike surfaces. This paper introduces a four-dimensional notion of the information available about a quantum systems boundary conditions in the various sets of decohering, coarse-grained histories it may display. This spacetime notion of information coincides with the familiar one when quantum theory is formulable in terms of states on spacelike surfaces but generalizes this notion when it cannot be so formulated. The idea of spacetime information is applied in several contexts: When spacetime geometry is fixed the information available through alternatives restricted to a fixed spacetime region is defined. The information available through histories of alternatives of general operators is compared to that obtained from the more limited coarse grainings of sum-over-histories quantum mechanics that refer only to coordinates. The definition of information is considered in generalized quantum theories. We consider as specific examples time-neutral quantum mechanics with initial and final conditions, quantum theories with nonunitary evolution, and the generalized quantum frameworks appropriate for quantum spacetime. In such theories complete information about a quantum system is not necessarily available on any spacelike surface but must be searched for throughout spacetime. The information loss commonly associated with the evolution of pure states into mixed states in black hole evaporation is thus not in conflict with the principles of generalized quantum mechanics.

James B. Hartle

1995-02-15T23:59:59.000Z

332

Submitting a Proposal to DOE | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Submitting a Proposal to DOE Submitting a Proposal to DOE Visiting Faculty Program (VFP) VFP Home Eligibility Benefits Participant Obligations How to Apply Selecting a Host DOE Laboratory Developing a Research Proposal Recommender Information Student Participants Submitting a Proposal to DOE Application Selection Process and Notification Key Dates Frequently Asked Questions Contact WDTS Home How to Apply Submitting a Proposal to DOE Print Text Size: A A A RSS Feeds FeedbackShare Page Through direct collaboration with research staff at DOE host laboratories, the VFP program provides an opportunity for faculty to help create innovative new capabilities and make discoveries germane to DOE science missions. Through the experience, visiting faculty members also develop integrated skills that translate to programs at their home institutions,

333

James H. Clarke, Ph.D. JAMES HAROLD CLARKE, Ph.D., BCES, F. AAFS  

E-Print Network (OSTI)

, and contaminated site investigation and remediation. 1980-82 RECRA Research, Inc., Amherst, New York Senior Vice investigation and remediation for the Nashville office. #12;James H. Clarke, Ph.D. Page 3 HONORS/AWARDS: Phi

Simaan, Nabil

334

General Information  

NLE Websites -- All DOE Office Websites (Extended Search)

ASD General Information ASD General Information APS Resources & Information A list of useful links for APS staff and users. APS Technical Publications Links to APS technical publications. APS Publications Database The official and comprehensive source of references for APS-related journal articles, conference papers, book chapters, dissertations, abstracts, awards, invited talks, etc. Image Library A collection of APS images. Responsibilities & Interfaces for APS Technical Systems Descriptions of the responsibilities of APS technical groups and how they interface with one another. APS Procedures Operational procedures for the APS. APS Specifications Specifications and approvals for upgrades or changes to existing APS hardware and software. APS Radiation Safety Policy & Procedures Committee Minutes

335

Sandia National Laboratories, California proposed CREATE facility environmental baseline survey.  

SciTech Connect

Sandia National Laboratories, Environmental Programs completed an environmental baseline survey (EBS) of 12.6 acres located at Sandia National Laboratories/California (SNL/CA) in support of the proposed Collaboration in Research and Engineering for Advanced Technology and Education (CREATE) Facility. The survey area is comprised of several parcels of land within SNL/CA, County of Alameda, California. The survey area is located within T 3S, R 2E, Section 13. The purpose of this EBS is to document the nature, magnitude, and extent of any environmental contamination of the property; identify potential environmental contamination liabilities associated with the property; develop sufficient information to assess the health and safety risks; and ensure adequate protection for human health and the environment related to a specific property.

Catechis, Christopher Spyros

2013-10-01T23:59:59.000Z

336

Information Resources  

Energy.gov (U.S. Department of Energy (DOE))

We've organized links and information on solar energy technologies and the SunShot Initiative to make it easier for you to find what you're looking for.

337

Information Causality  

E-Print Network (OSTI)

We review the literature on Information Causality. Since it's for a book, we don't think an abstract will be needed at all, so we have written this one just for the sake of the arXiv.

Marcin Paw?owski; Valerio Scarani

2011-12-06T23:59:59.000Z

338

Informed Chemists  

Science Journals Connector (OSTI)

... of communication into local chemistry departments and already working in the documentation field ? Does OSTI not know that British university libraries already act as local agents for other computerized information ...

R. J. DANNATT

1967-10-14T23:59:59.000Z

339

Contract Signature Using Quantum Information  

E-Print Network (OSTI)

This paper describes how to perform contract signature in a fair way using quantum information. The protocol proposed permits two partners, users of a communication network, to perform a contract signature based on the RSA security. The authentication of the signers is based on the use of a non-local XOR function of two classical bits.

Paulo Benicio Melo de Sousa; Rubens Viana Ramos

2007-11-08T23:59:59.000Z

340

Group Leader: Dieter Schneider Proposal Team: M. Allaire  

NLE Websites -- All DOE Office Websites (Extended Search)

Leader: Dieter Schneider Proposal Team: M. Allaire Leader: Dieter Schneider Proposal Team: M. Allaire 1 , L. Berman 1 , M. Chance 2 , W. Hendrickson 3 , A. Héroux 1 , J. Jakoncic 1 , Q. Liu 4 , A. Orville 1 , H. Robinson 1 , D. Schneider 1 , W. Shi 1 , A. Soares 1 , V. Stojanoff 1 , D. Stoner-Ma 1 , R. Sweet 1 1 Brookhaven National Laboratory, 2 Case Western Reserve Univ., 3 Columbia University, 4 New York Structural Biology Center FRONTIER MICROFOCUSING MACROMOLECULAR CRYSTALLOGRAPHY BEAMLINE (FMX) ADDITIONAL INFORMATION From: M .R. S awaya, S . Sambashivan, R . N elson, M .I. I vanova, S .A. Sievers, M .I. A postol, M.J. T hompson, M . B albirnie, J .J. Wiltzius, H .T. M cFarlane, A .O. M adsen, C . R iekel, a nd D . E isenberg. Atomic S tructures o f Amyloid C ross---ß S pines R eveal V aried Steric Z ippers. N ature 4 47, 4 53---7 ( 2007). Micro-focusing

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Proposal for all-graphene monolithic logic circuits Jiahao Kang, Deblina Sarkar, Yasin Khatami, and Kaustav Banerjee  

E-Print Network (OSTI)

Proposal for all-graphene monolithic logic circuits Jiahao Kang, Deblina Sarkar, Yasin Khatami://apl.aip.org/features/most_downloaded Information for Authors: http://apl.aip.org/authors #12;Proposal for all-graphene monolithic logic circuits. This letter introduces and explores an "all-graphene" device-interconnect co-design scheme, where a single 2

342

ARM - Selected Science Team Proposals - FY 1995  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) ARM Science Team Meetings User Meetings Annual Meetings of the Atmospheric System Research (ASR) Science Team and Fall Working Groups Accomplishments Read about the 20 years of accomplishments (PDF, 696KB) from the ARM Program and user facility. Performance Metrics ASR Metrics 2009 2008 2007 2006 Selected Science Team Proposals - FY 1995 Dr. R. Nelson Byrne, SAIC: "Evolution of a New GCM-Capable Stochastic Cloud/Radiation Parameterization Using ARM Data - Phase II" Dr. Steven J. Ghan, Pacific Northwest National Laboratory: "Parameterization of Convective Cloud Coverage in GCMs" Dr. George Golitsyn, Russian Academy of Sciences, Institute of

343

Proposal for a High Energy Nuclear Database  

SciTech Connect

We propose to develop a high-energy heavy-ion experimental database and make it accessible to the scientific community through an on-line interface. This database will be searchable and cross-indexed with relevant publications, including published detector descriptions. Since this database will be a community resource, it requires the high-energy nuclear physics community's financial and manpower support. This database should eventually contain all published data from Bevalac and AGS to RHIC to CERN-LHC energies, proton-proton to nucleus-nucleus collisions as well as other relevant systems, and all measured observables. Such a database would have tremendous scientific payoff as it makes systematic studies easier and allows simpler benchmarking of theoretical models to a broad range of old and new experiments. Furthermore, there is a growing need for compilations of high-energy nuclear data for applications including stockpile stewardship, technology development for inertial confinement fusion and target and source development for upcoming facilities such as the Next Linear Collider. To enhance the utility of this database, we propose periodically performing evaluations of the data and summarizing the results in topical reviews.

Brown, David A.; Vogt, Ramona

2005-03-31T23:59:59.000Z

344

Proposal to upgrade the MIPP experiment  

SciTech Connect

The upgraded MIPP physics results are needed for the support of NuMI projects, atmospheric cosmic ray and neutrino programs worldwide and will permit a systematic study of non-perturbative QCD interactions. The MIPP TPC is the largest contributor to the MIPP event size by far. Its readout system and electronics were designed in the 1990's and limit it to a readout rate of 60 Hz in simple events and {approx} 20 Hz in complicated events. With the readout chips designed for the ALICE collaboration at the LHC, we propose a low cost scheme of upgrading the MIPP data acquisition speed to 3000 Hz. This will also enable us to measure the medium energy numi target to be used for the NOvA/MINERvA experiments. We outline the capabilities of the upgraded MIPP detector to obtain high statistics particle production data on a number of nuclei that will help towards the understanding and simulation of hadronic showers in matter. Measurements of nitrogen cross sections will permit a better understanding of cosmic ray shower systematics in the atmosphere. In addition, we explore the possibilities of providing tagged neutral beams using the MIPP spectrometer that may be crucial for validating the Particle Flow Algorithm proposed for calorimeters for the International Linear Collider detectors. Lastly, we outline the physics potential of such a detector in understanding non-perturbative QCD processes.

Isenhower, D.; Sadler, M.; Towell, R.; Watson, S.; /Abilene Christian U.; Peterson, R.J.; /Colorado U.; Baker, W.; Carey, D.; Christian, D.; Demarteau, M.; Jensen, D.; Johnstone, C.; Meyer, H.; Raja, R.; Ronzhin, A.; Solomey, N.; Wester, W.; /Fermilab; Gutbrod, H.; Peters, K.; /Darmstadt, GSI; Feldman, G.; /Harvard U.; Torun, Y.; /IIT, Chicago; Messier, M.D.; /Indiana U. /Iowa U. /Dubna, JINR /Kent State U. /Groningen, KVI /Michigan U. /St. Petersburg, INP /Purdue U. /South Carolina U. /Virginia U. /Wisconsin U., Madison

2006-09-01T23:59:59.000Z

345

A Proposal for the Establishment of the Williams College Sustainability Dining Trubee Davison  

E-Print Network (OSTI)

A Proposal for the Establishment of the Williams College Sustainability Dining Center Trubee environmental leaders today is to find effective ways to encourage individuals to adopt sustainable modes for promoting sustainable behavior, because if an individual is not informed about, for instance, the connection

Aalberts, Daniel P.

346

Aspects of Western Refining, Inc.'s Proposed Acquisition of Giant Industries, Inc.  

Reports and Publications (EIA)

Presentation of company-level, non-proprietary data and relevant aggregate data for U.S. refinery capacity and gasoline marketing of Western Refining and Giant Industries to inform discussions of Western Refining Inc.'s proposed acquisition of Giant Industries Inc. for a total of $1.5 billion, which was announced August 28, 2006.

2006-01-01T23:59:59.000Z

347

Confidentiality of Research Proposals and Peer Reviews | U.S. DOE Office of  

Office of Science (SC) Website

Confidentiality of Research Proposals and Confidentiality of Research Proposals and Peer Reviews High Energy Physics (HEP) HEP Home About Research Facilities Science Highlights Benefits of HEP Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search Peer Merit / Review Policies Early Career Research Opportunities in High Energy Physics Graduate Fellows in High Energy Theory Guidelines Advisory Committees News & Resources Contact Information High Energy Physics U.S. Department of Energy SC-25/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3624 F: (301) 903-2597 E: sc.hep@science.doe.gov More Information » Peer Merit / Review Policies Confidentiality of Research Proposals and Peer Reviews Print Text Size: A A A RSS Feeds FeedbackShare Page

348

Evolution of toxicology information systems  

SciTech Connect

Society today is faced with new health risk situations that have been brought about by recent scientific and technical advances. Federal and state governments are required to assess the many potential health risks to exposed populations from the products (chemicals) and by-products (pollutants) of these advances. Because a sound analysis of any potential health risk should be based on the use of relevant information, it behooves those individuals responsible for making the risk assessments to know where to obtain needed information. This paper reviews the origins of toxicology information systems and explores the specialized information center concept that was proposed in 1963 as a means of providing ready access to scientific and technical information. As a means of illustrating this concept, the operation of one specialized information center (the Environmental Mutagen Information Center at Oak Ridge National Laboratory) will be discussed. Insights into how toxicological information resources came into being, their design and makeup, will be of value to those seeking to acquire information for risk assessment purposes. 7 refs., 1 fig., 4 tabs.

Wassom, J.S.; Lu, P.Y. [Oak Ridge National Laboratory, TN (United States)

1990-12-31T23:59:59.000Z

349

Notice of Proposed Floodplain and Wetlands Actions (DOE/EIS-0385) (03/28/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

398 Federal Register 398 Federal Register / Vol. 71, No. 59 / Tuesday, March 28, 2006 / Notices conditions that could result in an accidental or unauthorized detonation of nuclear explosives. Comments are invited on: (a) Whether the extended collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques

350

Request for Proposals in Organic & Sustainability Systems Research, Teaching & Outreach  

E-Print Network (OSTI)

Request for Proposals in Organic & Sustainability Systems Research, Teaching & Outreach Proposal at Cornell's College of Agriculture and Life Sciences (CALS) requests proposals for innovative research, teaching and extension/outreach projects involving organics and sustainability in farm and food systems

Pawlowski, Wojtek

351

Trastar: Proposed Penalty (2013-CE-49003) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Penalty (2013-CE-49003) Trastar: Proposed Penalty (2013-CE-49003) July 23, 2013 DOE alleged in a Notice of Proposed Civil Penalty that Trastar Inc. failed to certify a...

352

RAIL ROUTING PRACTICES AND PROPOSED ALTERNATIVES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

"Strawman" Report: "Strawman" Report: RAIL ROUTING PRACTICES AND PROPOSED ALTERNATIVES Number Section Comment Response RTG-1-AAR SECTION II Safeguards Routing Regulations, Para. 2 The NRC has identified five types of route characteristics that receive special consideration when NRC staff review routes for approval pursuant to 10 CFR 73: (1) routes through highly populated areas; (2) routes that would place the shipment or escort vehicle in a significantly disadvantageous position (for example, tunnels which would prevent the escort vehicle from maintaining continuous surveillance of the shipment vehicle); [Note this assumes a highway chase vehicle for rail. We expect security for rail shipments to be on the train with the shipment, and not a chase vehicle. Chase vehicles has their own inherent

353

Proposed Next Generation GRB Mission: EXIST  

Science Journals Connector (OSTI)

A next generation Gamma Ray Burst (GRB) mission to follow the upcoming Swift mission is described. The proposed Energetic X?ray Imaging Survey Telescope EXIST would yield the limiting (practical) GRB trigger sensitivity broad?band spectral and temporal response and spatial resolution over a wide field. It would provide high resolution spectra and locations for GRBs detected at GeV energies with GLAST. Together with the next generation missions Constellation?X NGST and LISA and optical?survey (LSST) telescopes EXIST would enable GRBs to be used as probes of the early universe and the first generation of stars. EXIST alone would give ?1050? positions (long or short GRBs) approximate redshifts from lags and constrain physics of jets orphan afterglows neutrinos and SGRs.

J. Grindlay; N. Gehrels; F. Harrison; R. Blandford; G. Fishman; C. Kouveliotou; D. H. Hartmann; S. Woosley; W. Craig; J. Hong

2003-01-01T23:59:59.000Z

354

Proposal for a High Energy Nuclear Database  

E-Print Network (OSTI)

We propose to develop a high-energy heavy-ion experimental database and make it accessible to the scientific community through an on-line interface. This database will be searchable and cross-indexed with relevant publications, including published detector descriptions. Since this database will be a community resource, it requires the high-energy nuclear physics community's financial and manpower support. This database should eventually contain all published data from Bevalac, AGS and SPS to RHIC and LHC energies, proton-proton to nucleus-nucleus collisions as well as other relevant systems, and all measured observables. Such a database would have tremendous scientific payoff as it makes systematic studies easier and allows simpler benchmarking of theoretical models to a broad range of old and new experiments. Furthermore, there is a growing need for compilations of high-energy nuclear data for applications including stockpile stewardship, technology development for inertial confinement fusion and target and ...

Vogt, D A B R

2005-01-01T23:59:59.000Z

355

An Upgrade Proposal from the PHENIX Collaboration  

E-Print Network (OSTI)

In this document the PHENIX collaboration proposes a major upgrade to the PHENIX detector at the Relativistic Heavy Ion Collider. This upgrade, sPHENIX, enables an extremely rich jet and beauty quarkonia physics program addressing fundamental questions about the nature of the strongly coupled quark-gluon plasma (QGP), discovered experimentally at RHIC to be a perfect fluid. The startling dynamics of the QGP on fluid-like length scales is an emergent property of quantum chromodynamics (QCD), seemingly implicit in the Lagrangian but stubbornly hidden from view. QCD is an asymptotically free theory, but how QCD manifests as a strongly coupled fluid with specific shear viscosity near $T_C$, as low as allowed by the uncertainty principle, is as fundamental an issue as that of how confinement itself arises.

Adare, A; Aidala, C; Ajitanand, N N; Akiba, Y; Akimoto, R; Alexander, J; Aoki, K; Apadula, N; Asano, H; Atomssa, E T; Awes, T C; Azmoun, B; Babintsev, V; Bai, M; Bai, X; Bandara, N; Bannier, B; Barish, K N; Baron, O; Bassalleck, B; Bathe, S; Baublis, V; Baumgart, S; Bazilevsky, A; Beaumier, M; Beckman, S; Belmont, R; Benjamin, G; Berdnikov, A; Berdnikov, Y; Blackburn, J; Blau, D S; Bobrek, M; Bok, J; Boose, S; Boyle, K; Britton,, C L; Brooks, M L; Bryslawskyj, J; Bumazhnov, V; Butler, C; Butsyk, S; Campbell, S; Carollo, A; Chai, J -S; Chen, C -H; Chernichenko, S; Chi, C Y; Chiu, M; Choi, I J; Choi, J B; Choi, S; Chollet, S; Christiansen, P; Chujo, T; Cianciolo, V; Citron, Z; Cole, B A; Cronin, N; Crossett, N; Csand, M; D'Orazio, L; Dairaku, S; Danley, D; Datta, A; Daugherity, M S; David, G; DeBlasio, K; Debraine, A; Dehmelt, K; Denisov, A; Deshpande, A; Desmond, E J; Dietzsch, O; Ding, L; Dion, A; Diss, P B; Do, J H; Donadelli, M; Drapier, O; Drees, A; Drees, K A; Durham, J M; Durum, A; Eberle, L; Efremenko, Y V; Engelmore, T; Enokizono, A; Esumi, S; Eyser, K O; Fadem, B; Feege, N; Fields, D E; Finger, M; FingerJr., M; Fleuret, F; Fokin, S L; Frantz, J E; Franz, A; Frawley, A D; Fukao, Y; Fusayasu, T; Gainey, K; Gal, C; Gallus, P; Garg, P; Garishvili, A; Garishvili, I; Gastaldi, F; Ge, H; Giannotti, P; Giordarno, F; Glenn, A; Gong, X; Gonin, M; Goto, Y; de Cassagnac, R Granier; Grau, N; Greene, S V; Perdekamp, M Grosse; Gu, Y; Gunji, T; Guragain, H; Hachiya, T; Haggerty, J S; Hahn, K I; Hamagaki, H; Hamilton, H F; Han, S Y; Hanks, J; Hasegawa, S; Haseler, T O S; Hashimoto, K; Hayano, R; Hayashi, S; He, X; Hemmick, T K; Hester, T; Hill, J C; Hoefferkamp, M; Hollis, R S; Homma, K; Hong, B; Hori, Y; Hoshino, T; Huang, J; Huang, S; Hutchins, J R; Ichihara, T; Ikeda, Y; Imai, K; Imazu, Y; Imrek, J; Inaba, M; Iordanova, A; Isenhower, D; Isinhue, A; Isupov, A; Ivanischev, D; Ivanov, V; Jacak, B V; Jeon, S J; Jezghani, M; Jia, J; Jiang, X; Johnson, B M; Joo, K S; Jouan, D; Jumper, D S; Kamin, J; Kanda, S; Kang, B H; Kang, J H; Kang, J S; Kapustinsky, J; Karatsu, K; Kawall, D; Kazantsev, A V; Kehayias, H -J; Key, J A; Khachatryan, V; Khandai, P K; Khanzadeev, A; Kijima, K M; Kim, C; Kim, D H; Kim, D J; Kim, E -J; Kim, H J; Kim, K -B; Kim, M; Kim, Y -J; Kim, Y K; Kimelman, B; Kiss, ; Kistenev, E; Kitamura, R; Klatsky, J; Kleinjan, D; Kline, P; Koblesky, T; Kochenda, L; Kofarago, M; Komatsu, Y; Komkov, B; Koster, J; Kotchetkov, D; Kotov, D; Kravtsov, P; Krizek, F; Kurita, K; Kuriyama, M; Kurosawa, M; Kwon, Y; Lacey, R; Lai, Y S; Lajoie, J G; Lebedev, A; Lee, G H; Lee, J; Lee, K B; Lee, K S; Lee, S; Lee, S H; Lefferts, R; Leitch, M J; Leite, M A L; Leitgab, M; Lewis, B; Li, X; Lim, S H; Lipski, A; Litvinenko, A; Liu, M X; Love, B; Lynch, D; Lynch, M; Maguire, C F; Makdisi, Y I; Makek, M; Malakhov, A; Manion, A; Manko, V I; Mannel, E; Maruyama, T; Masumoto, S; McCumber, M; McGaughey, P L; McGlinchey, D; McKay, R; McKinney, C; Meles, A; Mendoza, M; Menegasso, R; Meredith, B; Miake, Y; Mibe, T; Mignerey, A C; Milov, A; Mishra, D K; Mitchell, J T; Miyasaka, S; Mizuno, S; Mohanty, A K; Montuenga, P; Moon, T; Morrison, D P; Moskowitz, M; Motschwiller, S; Moukhanova, T V; Murakami, T; Murata, J; Mwai, A; Nagae, T; Nagamiya, S; Nagashima, K; Nagle, J L; Nagy, M I; Nakagawa, I; Nakagomi, H; Nakamiya, Y; Nakamura, K R; Nakamura, T; Nakano, K; Nattrass, C; Nederlof, A; Netrakanti, P K; Nihashi, M; Niida, T; Ninomiya, K; Nishimura, S; Northacker, D; Nouicer, R; Novak, T; Novitzky, N; Nukariya, A; Nyanin, A S; O'Brien, E; Ogilvie, C A; Oide, H; Okada, K; Koop, J D Orjuela; Osborn, J D; Oskarsson, A; sterman, L; Ozawa, K; Pancake, C; Pantuev, V; Papavassiliou, V; Park, I H; Park, J S; Park, S; Park, S K; Pate, S F; Patel, L; Patel, M; Peng, J -C; Perepelitsa, D; Perera, G D N; Peresedov, V; Peressounko, D Yu; Perry, J; Petti, R; Pinkenburg, C; Pinson, R; Pisani, R P; Popule, J; Purschke, M L; Qu, H; Radhakrishnan, S; Rak, J; Ramson, B J; Ravinovich, I; Read, K F; Reynolds, D; Reynolds, R; Riabov, V; Riabov, Y; Richardson, E; Rinn, T; Riveli, N; Roach, D; Rolnick, S D; Rosati, M; Roschin, E; Rowan, Z; Rubin, J G; Rukoyatkin, P; Ryu, M S; Safonov, A; Sahlmueller, B; Saito, N; Sakaguchi, T; Sako, H; Samsonov, V; Sano, M; Sarsour, M; Sato, S; Sawada, S; Schaefer, B; Schmoll, B K; Sedgwick, K; Seele, J; Seidl, R; Sekiguchi, Y; Sen, A; Seto, R; Sett, P; Sexton, A; Shafto, E; Sharma, D; Shaver, A; Shein, I; Shibata, T -A; Shigaki, K; Shimomura, M; Shoji, K; Shukla, P; Sicho, P; Sickles, A; Silva, C L; Silvermyr, D; Singh, B K; Singh, C P; Singh, V; Sippach, F W; Skolnik, M; Snowball, M; Solano, S; Soldatov, A; Soltz, R A; Sondheim, W E; Sorensen, S P; Soumya, M; Sourikova, I V; Stankus, P W; Steinberg, P; Stenlund, E; Stepanov, M; Ster, A; Stevens, L; Stoll, S P; Stone, M R; Sugitate, T; Sukhanov, A; Sumita, T; Sun, J; Sziklai, J; Takagui, E M

2015-01-01T23:59:59.000Z

356

An Upgrade Proposal from the PHENIX Collaboration  

E-Print Network (OSTI)

In this document the PHENIX collaboration proposes a major upgrade to the PHENIX detector at the Relativistic Heavy Ion Collider. This upgrade, sPHENIX, enables an extremely rich jet and beauty quarkonia physics program addressing fundamental questions about the nature of the strongly coupled quark-gluon plasma (QGP), discovered experimentally at RHIC to be a perfect fluid. The startling dynamics of the QGP on fluid-like length scales is an emergent property of quantum chromodynamics (QCD), seemingly implicit in the Lagrangian but stubbornly hidden from view. QCD is an asymptotically free theory, but how QCD manifests as a strongly coupled fluid with specific shear viscosity near $T_C$, as low as allowed by the uncertainty principle, is as fundamental an issue as that of how confinement itself arises.

A. Adare; S. Afanasiev; C. Aidala; N. N. Ajitanand; Y. Akiba; R. Akimoto; J. Alexander; K. Aoki; N. Apadula; H. Asano; E. T. Atomssa; T. C. Awes; B. Azmoun; V. Babintsev; M. Bai; X. Bai; N. Bandara; B. Bannier; K. N. Barish; O. Baron; B. Bassalleck; S. Bathe; V. Baublis; S. Baumgart; A. Bazilevsky; M. Beaumier; S. Beckman; R. Belmont; G. Benjamin; A. Berdnikov; Y. Berdnikov; J. Blackburn; D. S. Blau; M. Bobrek; J. Bok; S. Boose; K. Boyle; C. L. Britton, Jr.; M. L. Brooks; J. Bryslawskyj; V. Bumazhnov; C. Butler; S. Butsyk; S. Campbell; A. Carollo; J. -S. Chai; C. -H. Chen; S. Chernichenko; C. Y. Chi; M. Chiu; I. J. Choi; J. B. Choi; S. Choi; S. Chollet; P. Christiansen; T. Chujo; V. Cianciolo; Z. Citron; B. A. Cole; N. Cronin; N. Crossett; M. Csand; L. D'Orazio; S. Dairaku; D. Danley; A. Datta; M. S. Daugherity; G. David; K. DeBlasio; A. Debraine; K. Dehmelt; A. Denisov; A. Deshpande; E. J. Desmond; O. Dietzsch; L. Ding; A. Dion; P. B. Diss; J. H. Do; M. Donadelli; O. Drapier; A. Drees; K. A. Drees; J. M. Durham; A. Durum; L. Eberle; Y. V. Efremenko; T. Engelmore; A. Enokizono; S. Esumi; K. O. Eyser; B. Fadem; N. Feege; D. E. Fields; M. Finger; M. FingerJr.; F. Fleuret; S. L. Fokin; J. E. Frantz; A. Franz; A. D. Frawley; Y. Fukao; T. Fusayasu; K. Gainey; C. Gal; P. Gallus; P. Garg; A. Garishvili; I. Garishvili; F. Gastaldi; H. Ge; P. Giannotti; F. Giordarno; A. Glenn; X. Gong; M. Gonin; Y. Goto; R. Granier de Cassagnac; N. Grau; S. V. Greene; M. Grosse Perdekamp; Y. Gu; T. Gunji; H. Guragain; T. Hachiya; J. S. Haggerty; K. I. Hahn; H. Hamagaki; H. F. Hamilton; S. Y. Han; J. Hanks; S. Hasegawa; T. O. S. Haseler; K. Hashimoto; R. Hayano; S. Hayashi; X. He; T. K. Hemmick; T. Hester; J. C. Hill; M. Hoefferkamp; R. S. Hollis; K. Homma; B. Hong; Y. Hori; T. Hoshino; J. Huang; S. Huang; J. R. Hutchins; T. Ichihara; Y. Ikeda; K. Imai; Y. Imazu; J. Imrek; M. Inaba; A. Iordanova; D. Isenhower; A. Isinhue; A. Isupov; D. Ivanischev; V. Ivanov; B. V. Jacak; S. J. Jeon; M. Jezghani; J. Jia; X. Jiang; B. M. Johnson; K. S. Joo; D. Jouan; D. S. Jumper; J. Kamin; S. Kanda; B. H. Kang; J. H. Kang; J. S. Kang; J. Kapustinsky; K. Karatsu; D. Kawall; A. V. Kazantsev; H. -J. Kehayias; J. A. Key; V. Khachatryan; P. K. Khandai; A. Khanzadeev; K. M. Kijima; C. Kim; D. H. Kim; D. J. Kim; E. -J. Kim; H. J. Kim; K. -B. Kim; M. Kim; Y. -J. Kim; Y. K. Kim; B. Kimelman; . Kiss; E. Kistenev; R. Kitamura; J. Klatsky; D. Kleinjan; P. Kline; T. Koblesky; L. Kochenda; M. Kofarago; Y. Komatsu; B. Komkov; J. Koster; D. Kotchetkov; D. Kotov; P. Kravtsov; F. Krizek; K. Kurita; M. Kuriyama; M. Kurosawa; Y. Kwon; R. Lacey; Y. S. Lai; J. G. Lajoie; A. Lebedev; G. H. Lee; J. Lee; K. B. Lee; K. S. Lee; S. Lee; S. H. Lee; R. Lefferts; M. J. Leitch; M. A. L. Leite; M. Leitgab; B. Lewis; X. Li; S. H. Lim; A. Lipski; A. Litvinenko; M. X. Liu; B. Love; D. Lynch; M. Lynch; C. F. Maguire; Y. I. Makdisi; M. Makek; A. Malakhov; A. Manion; V. I. Manko; E. Mannel; T. Maruyama; S. Masumoto; M. McCumber; P. L. McGaughey; D. McGlinchey; R. McKay; C. McKinney; A. Meles; M. Mendoza; R. Menegasso; B. Meredith; Y. Miake; T. Mibe; A. C. Mignerey; A. Milov; D. K. Mishra; J. T. Mitchell; S. Miyasaka; S. Mizuno; A. K. Mohanty; P. Montuenga; T. Moon; D. P. Morrison; M. Moskowitz; S. Motschwiller; T. V. Moukhanova; T. Murakami; J. Murata; A. Mwai; T. Nagae; S. Nagamiya; K. Nagashima; J. L. Nagle; M. I. Nagy; I. Nakagawa; H. Nakagomi; Y. Nakamiya; K. R. Nakamura; T. Nakamura; K. Nakano; C. Nattrass; A. Nederlof; P. K. Netrakanti; M. Nihashi; T. Niida; K. Ninomiya; S. Nishimura; D. Northacker; R. Nouicer; T. Novak; N. Novitzky; A. Nukariya; A. S. Nyanin; E. O'Brien; C. A. Ogilvie; H. Oide; K. Okada; J. D. Orjuela Koop; J. D. Osborn; A. Oskarsson; L. sterman; K. Ozawa; C. Pancake; V. Pantuev; V. Papavassiliou; I. H. Park; J. S. Park; S. Park; S. K. Park; S. F. Pate; L. Patel; M. Patel; J. -C. Peng; D. Perepelitsa; G. D. N. Perera; V. Peresedov; D. Yu. Peressounko; J. Perry; R. Petti; C. Pinkenburg; R. Pinson; R. P. Pisani; J. Popule; M. L. Purschke; H. Qu; S. Radhakrishnan; J. Rak; B. J. Ramson; I. Ravinovich; K. F. Read; D. Reynolds; R. Reynolds; V. Riabov; Y. Riabov; E. Richardson; T. Rinn; N. Riveli; D. Roach; S. D. Rolnick; M. Rosati; E. Roschin; Z. Rowan; J. G. Rubin; P. Rukoyatkin; M. S. Ryu; A. Safonov; B. Sahlmueller; N. Saito; T. Sakaguchi; H. Sako; V. Samsonov; M. Sano; M. Sarsour; S. Sato; S. Sawada; B. Schaefer; B. K. Schmoll; K. Sedgwick; J. Seele; R. Seidl; Y. Sekiguchi; A. Sen; R. Seto; P. Sett; A. Sexton; E. Shafto; D. Sharma; A. Shaver; I. Shein; T. -A. Shibata; K. Shigaki; M. Shimomura; K. Shoji; P. Shukla; P. Sicho; A. Sickles; C. L. Silva; D. Silvermyr; B. K. Singh; C. P. Singh; V. Singh; F. W. Sippach; M. Skolnik; M. Snowball; S. Solano; A. Soldatov; R. A. Soltz; W. E. Sondheim; S. P. Sorensen; M. Soumya; I. V. Sourikova; P. W. Stankus

2015-01-25T23:59:59.000Z

357

Chapter 2 - Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

2-1 CHAPTER 2 PROPOSED ACTION AND ALTERNATIVES The WIPP facility, in addition to serving its primary mission as a TRU waste disposal site, needs to perform a variety of actinide chemistry experiments to (1) support WIPP's recertification efforts, (2) address scientific questions important to WIPP, (3) improve TRU waste characterization techniques, and (4) improve DOE's understanding of how the waste interacts with the natural environment in order to better understand waste isolation performance. In the past, WIPP-related actinide chemistry experiments have taken place at DOE laboratory facilities at other DOE sites such as LANL. However, due to reductions in travel budgets and additional security requirements being imposed on DOE weapons

358

Local Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Local Information Local Information Local Information Welcome to Golden, Colorado, the location of the 2014 Electrical Safety Workshop. Visiting NREL The National Renewable Energy Laboratory (NREL) has research facilities and offices at several locations in Golden, Colorado (near Boulder), and in Washington, D.C. In Golden, you'll find the NREL Education Center, along with many of our research laboratories and administrative offices. The National Wind Technology Center is a separate facility located about 5 miles south of Boulder. Read more » Transportation NREL is accessible via bus on the Regional Transportation District (RTD) Route 20 from Aurora and Denver. Route 20 travels along 20th Avenue and ends at the NREL Education Center. Visit the RTD Web site or call 303-299-6000 to plan your trip or for more

359

Energy Department Authorizes Second Proposed Facility to Export...  

Office of Environmental Management (EM)

Second Proposed Facility to Export Liquefied Natural Gas Energy Department Authorizes Second Proposed Facility to Export Liquefied Natural Gas May 17, 2013 - 12:00pm Addthis News...

360

Proposed Procedures for Liquefied Natural Gas Export Decisions...  

Office of Environmental Management (EM)

Proposed Procedures for Liquefied Natural Gas Export Decisions Proposed Procedures for Liquefied Natural Gas Export Decisions On August 15, 2014, the Department of Energy's (DOE)...

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Energy Department Authorizes Additional Volume at Proposed Freeport...  

Office of Environmental Management (EM)

Additional Volume at Proposed Freeport LNG Facility to Export Liquefied Natural Gas Energy Department Authorizes Additional Volume at Proposed Freeport LNG Facility to Export...

362

DOE Signs Notice to Prepare Environmental Assessment on Proposed...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Signs Notice to Prepare Environmental Assessment on Proposed Project with Germany DOE Signs Notice to Prepare Environmental Assessment on Proposed Project with Germany June 30,...

363

EIS-0218: Proposed Nuclear Weapons Nonproliferation Policy Concerning...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18: Proposed Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel EIS-0218: Proposed Nuclear Weapons Nonproliferation Policy Concerning...

364

BPA, proposed I-5 Corridor Reinforcement transmission project...  

NLE Websites -- All DOE Office Websites (Extended Search)

Regional GIS Database, 2009. Facilities Proposed New Substation Proposed Route Segments BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

365

DOE response to questions from AHAM on the supplemental proposed...  

Energy Savers (EERE)

response to questions from AHAM on the supplemental proposed test procedure for residential clothes washers DOE response to questions from AHAM on the supplemental proposed test...

366

EA-1993: Proposed High Explosive Science & Engineering Project...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3: Proposed High Explosive Science & Engineering Project, Pantex Plant, Amarillo, Texas EA-1993: Proposed High Explosive Science & Engineering Project, Pantex Plant, Amarillo,...

367

Open call: Special Science Call for Proposals | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

Open call: Special Science Call for Proposals Open call: Special Science Call for Proposals This call closed Sept. 15, 2014 (left) Cyanothece sp. PCC 7822, a marine unicellular...

368

EA-1943: Proposed Long Baseline Neutrino Experiment (LBNE) at...  

Energy Savers (EERE)

943: Proposed Long Baseline Neutrino Experiment (LBNE) at Fermilab, Batavia, Illinois EA-1943: Proposed Long Baseline Neutrino Experiment (LBNE) at Fermilab, Batavia, Illinois...

369

Proposal Review Criteria for Fiscal Year 2014 | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

Review Criteria for Fiscal Year 2014 Proposal Review Criteria for Fiscal Year 2014 User proposals are peer reviewed against five criteria. For each criterion, the reviewer rates...

370

The Soviet Nordic Nuclear Weapon Free Zone proposal .  

E-Print Network (OSTI)

??This thesis examines the Soviet proposal and its ramifications for the United States and the West. The central theme running through each Soviet proposal has (more)

Lumsden, Catherine Anne

1990-01-01T23:59:59.000Z

371

Hospital Information System  

Science Journals Connector (OSTI)

Ahospital information system is an information system for processing data, information and knowledge in hospital ...

2008-01-01T23:59:59.000Z

372

INFORMATION NOTICE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NOTICE NOTICE March 30, 2012 In addition to New York state approval requirements, the Champlain Hudson Power Express, Inc. project (Champlain Hudson Project) has applied to the United States Department of Energy (DOE) for a Presidential permit, a permit necessary for the applicant to construct, operate, maintain, and connect the proposed electric transmission line across the U.S.-Canada border. Among other things, DOE will assess the potential environmental impacts of the Champlain Hudson Project and determine whether issuance of a Presidential permit is consistent with the public interest. DOE is aware that the New York State Public Service Commission (Commission) will hold public statement hearings in April on the Joint Proposal submitted to the Commission on

373

postgraduate information  

E-Print Network (OSTI)

, biomedical engineering and technology, clean energy, water and the environment, complex systems and materialspostgraduate guide 2014 information technology and management #12;"The knowledge and skills Technology has been an excellent investment in my own development and will be crucial to realising my future

Scholz, Bernhard

374

Information International  

E-Print Network (OSTI)

. Orientation 17 Section 4 ­ Miscellaneous information 18 A. Dates of future academic sessions 18 B. Contact Checklist Back Cover Contents EUROPEAN NATIONALS/RESIDENTS NEED TO READ THE WHOLE OF ALL SECTIONS MARKED NON-EUROPEAN NATIONALS/RESIDENTS NEED TO READ THE WHOLE OF ALL SECTIONS MARKED SECTIONS MARKED SHOULD BE READ BY ALL

Petriu, Emil M.

375

FRN 2025 PMI proposal.pdf  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Federal Register 3 Federal Register / Vol. 76, No. 200 / Monday, October 17, 2011 / Notices or 202-208-1659 (TTY), or send a fax to 202-208-2106 with the required accommodations. For more information about this meeting, please contact: Sarah McKinley, Office of External Affairs, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, (202) 502-8368, sarah.mckinley@ferc.gov. Dated: October 7, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011-26695 Filed 10-14-11; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to

376

Exploiting adversary's risk profiles in imperfect information security games  

Science Journals Connector (OSTI)

At present much of the research which proposes to provide solutions to Imperfect Information Non-Cooperative games provides superficial analysis which then requires a priori knowledge of the game to be played. We propose that High Card, a simple Multiplayer ... Keywords: adversarial game theory, high card, imperfect information

Gabriel Fortunato Stocco; George Cybenko

2011-11-01T23:59:59.000Z

377

Energy Department Issues Draft Request for Proposals for Operation of its  

NLE Websites -- All DOE Office Websites (Extended Search)

Issues Draft Request for Proposals for Operation of its Pacific Issues Draft Request for Proposals for Operation of its Pacific Northwest National Laboratory in Washington News Featured Articles Science Headlines 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Presentations & Testimony News Archives Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 10.25.07 Energy Department Issues Draft Request for Proposals for Operation of its Pacific Northwest National Laboratory in Washington Print Text Size: A A A Subscribe FeedbackShare Page WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued a draft Request for Proposals (RFP) for prospective contractors who are interested in competing on a full and open basis to manage and operate DOE's Pacific

378

EA-1606: Proposed Use of Savannah River Site Lands for Military Training,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

06: Proposed Use of Savannah River Site Lands for Military 06: Proposed Use of Savannah River Site Lands for Military Training, South Carolina EA-1606: Proposed Use of Savannah River Site Lands for Military Training, South Carolina Summary This EA evaluates the environmental impacts of a proposal for the Department of Defense and Department of Homeland Security to use the Savannah River Site, near Aiken, South Carolina, for military training purposes. For more information, contact: Mr. Andrew R. Grainger NEPA Compliance Officer U. S. Department of Energy Savannah River Operations Office Building 730-1B, Room 3150 Aiken, SC 29808 Telephone: 803-952-8001 Fax/telephone: 1-800-881-7292 Electronic mail: nepa@srs.gov Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download

379

Traditional revolution : formalizing the informal : a proposal for the "periphery urbanite" Lagos, Abuja & Port-Harcourt  

E-Print Network (OSTI)

The inherited modernist principles of urban design and development policy have left Social exclusion in its wake.The cities founded during colonial times and there-after continue the legacy of colonial urban development. ...

Rhodes-Vivour, Patrick

2008-01-01T23:59:59.000Z

380

VULCAN User Information | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Useful Information for VULCAN Users Useful Information for VULCAN Users Become a VULCAN User Contact us for capabilities, experiment design, and development of proposals. Refer to VULCAN Proposal Key Points before writing the proposal. Submit your proposal Approved Proposals You will be notified of an experiment date and will need to confirm the date by replying to the email and the experiment in the IPTS system. Prepare and Ship Your Samples We recommend VULCAN standard samples. If you cannot provide standard sample geometry, please prepare grip adapters. Ship your samples Non-activated samples coming to SNS: Attention: Special requirements (like refrigeration) To: Neutron Sciences User Sample IPTS # XXXX, Beam line 7 Oak Ridge National Laboratory/SNS Site Chestnut Ridge, Bldg 8920 Oak Ridge, TN 37830

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

DOE Publishes Supplemental Proposed Determination for Miscellaneous Residential Refrigeration Products  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy has published a supplemental proposed determination regarding miscellaneous residential refrigeration products.

382

Loan Loss Reserve Request for ProposalsTemplate  

Energy.gov (U.S. Department of Energy (DOE))

Template to request for proposals for residential energy efficiency loan facilities. Author: Energy Finance Corp

383

Information Repository  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Information Repository Documents 3 Information Repository Documents WIPP Annual Waste Minimization Report Transmittal of the Waste Isolation Pilot Plant Annual Waste Minimization Report, dated November 14, 2013 Class 1 Permit Modifications and NMED Responses Class 1 Modification, August 29, 2013 WIPP Hazardous Waste Facility Permit EPA I.D. Number NM4890139088. (1. revise a course outline; 2. revise table and panel figures to include Panel 7; 3. update description related to Type B Packages; and 4. update TRUPACT-II and HalfPACT figures) JE Kieling, NMED dated October 13, 2013 Fee Assessment Class 1 Permit Modification WIPP Hazardous Waste Facility Permit EPA I.D. Number NM4890139088-TSDF (Revise a Course Outline; Revise Table and Panel Figures to Include Panel 7; Update Descriptions Related to Type B Packages; and Update TRUPACT-ll and HalfPACT Figures) JM Kieling, NMED dated September 23, 2013

384

Informal Report  

Office of Scientific and Technical Information (OSTI)

W-^^ LA-8034-MS ^ - W-^^ LA-8034-MS ^ - - ^ / Informal Report "c o O o -*-* "co > Specific Heat and Thermal Conductivity of Explosives, Mixtures, and Plastic-Bonded Explosives Determined Experimentally \mm ^ts\ LOS ALAMOS SCIENTIFIC LABORATORY Post Office Box 1663 Los Alamos. New Mexico 87545 DISTR!DU7irM o r TdiS BGGbT.lENT IS UNLIMITED DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately

385

Transmission Information  

E-Print Network (OSTI)

(symbols/s) information rate: R = Rs ·H (bits/s) . Code each symbol by log 2 q bits (BCD), then data rate Rs · log 2 q > R, unless source is equal probable pi = 1/q, 1 # i # q . How to code symbols in an e that the signal exhibits some form of redundancy, which should be exploited when the signal is coded

Chen, Sheng

386

Transmission Information  

E-Print Network (OSTI)

Memoryless source with independent symbols (code each symbol by log 2 q bits is called binary coded decimal (BCD)) mi, pi 1 # i # q # # # # BCD: log 2 q (bits/symbol) symbol rate Rs (symbols/s) data bit rate: Rs/symbol) Information rate R = Rs ·H (bits/s) . How to code symbols to achieve e#ciency (data bit rate = R)? 14 #12

Chen, Sheng

387

Revised ROD for FEIS on Proposed Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel (  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

720 720 Federal Register / Vol. 61, No. 144 / Thursday, July 25, 1996 / Notices 1995 (44 U. S. C. Chapter 35) requires that the Office of Management and Budget (OMB) provide interested Federal agencies and the public an early opportunity to comment on information collection requests. OMB may amend or waive the requirement for public consultation to the extent that public participation in the approval process would defeat the purpose of the information collection, violate State or Federal law, or substantially interfere with any agency's ability to perform its statutory obligations. The Director of the Information Resources Group publishes this notice containing proposed information collection requests prior to submission of these requests to OMB. Each proposed information collection,

388

Analytic tools for information warfare  

SciTech Connect

Information warfare and system surety (tradeoffs between system functionality, security, safety, reliability, cost, usability) have many mechanisms in common. Sandia`s experience has shown that an information system must be assessed from a {ital system} perspective in order to adequately identify and mitigate the risks present in the system. While some tools are available to help in this work, the process is largely manual. An integrated, extensible set of assessment tools would help the surety analyst. This paper describes one approach to surety assessment used at Sandia, identifies the difficulties in this process, and proposes a set of features desirable in an automated environment to support this process.

Vandewart, R.L.; Craft, R.L.

1996-05-01T23:59:59.000Z

389

Coal quality and estimated coal resources in the proposed Colville Mining District, central North Slope, Alaska  

SciTech Connect

The proposed Colville Mining District (CMD) encompasses 27,340 mi{sup 2} (70,800 km{sup 2}) in the central part of the North Slope. Known coal deposits within the proposed district range from Mississippian to Tertiary in age. Available information indicates that neither Mississippian and Tertiary coals in the CMD constitute a significant resource because they are excessively deep, thin, or high in ash content; however, considerable amount of low-sulfur Cretaceous coal is present. The paper briefly describes the geology and quality of these coal reserves. Difficult conditions will restrict mining of these coals in the near future.

Stricker, G.D. [Geological Survey, Denver, CO (United States); Clough, J.G. [Alaska Department of Natural Resources, Fairbanks, AK (United States). Division of Geological and Geophysical Surveys

1994-12-31T23:59:59.000Z

390

Implementation Proposal for The National Action Plan on Demand Response |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for The National Action Plan on Demand Implementation Proposal for The National Action Plan on Demand Response Implementation Proposal for The National Action Plan on Demand Response August 1, 2011 - 3:54pm Addthis EXECUTIVE SUMMARY The staff of the Federal Energy Regulatory Commission (FERC) and the U.S. Department of Energy (DOE) developed this implementation proposal as required by section 529 of the Energy Independence and Security Act of 2007 (EISA).1 In particular, this proposal complies with EISA's mandate "to submit to Congress a proposal to implement the [National] Action Plan [on Demand Response], including specific proposed assignments of responsibility, proposed budget amounts, and any agreements secured for participation from State and other participants."2 The objective of the proposal is to implement the National Action Plan to

391

Proposal Submittal and Scheduling Procedures for Research | Stanford  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Submittal and Scheduling Procedures for Research Proposal Submittal and Scheduling Procedures for Research New Proposals Standard GU Proposals Instructions for New Standard Proposals (Not LOI or Rapid Access) Tips for How to Wow Rapid Access Letter of Intent (LOI) Proposal Extension Requests X-ray/VUV Macromolecular Crystallography Beam Time Allocation/Scheduling How to Request Beam Time SSRL Access Policy SSRL Schedules New Proposals SSRL operates as a dedicated synchrotron radiation source for approximately nine months per year (usually from early November through early August). Submitting a proposal is the first step to access beam time at SSRL. SSRL scientists are available to help answer questions about the accelerator (SPEAR3), beam lines, capabilities, science or techniques to help users plan their experiments and their SSRL proposals.

392

Information Security  

Directives, Delegations, and Requirements

Establishes security requirements for the protection and control of information and matter required to be classified or controlled by statutes, regulations, or Department of Energy directives. Section E, Technical Surveillance Countermeasures Program, is Official Use Only. Please contact the DOE Office of Health, Safety and Security at 301-903-0292 if your official duties require you to have access to this part of the directive. Cancels: DOE M 471.2-1B, DOE M 471.2-1C, DOE M 471.2-4, and DOE O 471.2A

2007-06-29T23:59:59.000Z

393

Information Security  

Directives, Delegations, and Requirements

This Manual establishes security requirements for the protection and control of information and matter required to be classified or controlled by statutes, regulations, or Department of Energy directives. Attachment E, Technical Surveillance Countermeasures Program, is for Official Use Only. Contact the Office of Security and Safety Performance Assurance at 301-903-3653 if your official duties require you to have access to this part of the directive. Cancels: DOE M 471.2-1B, DOE M 471.2-1C, DOE M 471.2-4, and DOE O 471.2A.

2005-08-26T23:59:59.000Z

394

Information erasure  

Science Journals Connector (OSTI)

Landauers principle states that in erasing one bit of information, on average, at least kBT ln(2) energy is dissipated into the environment (where kB is Boltzmanns constant and T is the temperature of the environment at which one erases). Here, Landauers principle is microscopically derived without direct reference to the second law of thermodynamics. This is done for a classical system with continuous space and time, with discrete space and time, and for a quantum system. The assumption made in all three cases is that during erasure the bit is in contact with a thermal reservoir.

Barbara Piechocinska

2000-05-17T23:59:59.000Z

395

Quantum information with Rydberg atoms  

Science Journals Connector (OSTI)

Rydberg atoms with principal quantum number n?1 have exaggerated atomic properties including dipole-dipole interactions that scale as n4 and radiative lifetimes that scale as n3. It was proposed a decade ago to take advantage of these properties to implement quantum gates between neutral atom qubits. The availability of a strong long-range interaction that can be coherently turned on and off is an enabling resource for a wide range of quantum information tasks stretching far beyond the original gate proposal. Rydberg enabled capabilities include long-range two-qubit gates, collective encoding of multiqubit registers, implementation of robust light-atom quantum interfaces, and the potential for simulating quantum many-body physics. The advances of the last decade are reviewed, covering both theoretical and experimental aspects of Rydberg-mediated quantum information processing.

M. Saffman; T. G. Walker; K. Mlmer

2010-08-18T23:59:59.000Z

396

Information transfer at multiple scales  

Science Journals Connector (OSTI)

In the study of complex systems a fundamental issue is the mapping of the networks of interaction between constituent subsystems of a complex system or between multiple complex systems. Such networks define the web of dependencies and patterns of continuous and dynamic coupling between the systems elements characterized by directed flow of information spanning multiple spatial and temporal scales. Here, we propose a wavelet-based extension of transfer entropy to measure directional transfer of information between coupled systems at multiple time scales and demonstrate its effectiveness by studying (a) three artificial maps, (b) physiological recordings, and (c) the time series recorded from a chaos-controlled simulated robot. Limitations and potential extensions of the proposed method are discussed.

Max Lungarella; Alex Pitti; Yasuo Kuniyoshi

2007-11-27T23:59:59.000Z

397

International PV QA Task Force's Proposed Comparative Rating System for PV Modules: Preprint  

SciTech Connect

The International PV Quality Assurance Task Force is developing a rating system that provides comparative information about the relative durability of PV modules. Development of accelerated stress tests that can provide such comparative information is seen as a major step toward being able to predict PV module service life. This paper will provide details of the ongoing effort to determine the format of such an overall module rating system. The latest proposal is based on using three distinct climate zones as defined in IEC 60721-2-1 for two different mounting systems. Specific stresses beyond those used in the qualification tests are being developed for each of the selected climate zones.

Wohlgemuth, J.; Kurtz, S.

2014-10-01T23:59:59.000Z

398

INFORMAL REPORT  

NLE Websites -- All DOE Office Websites (Extended Search)

q?% q?% LA-5031 -MS INFORMAL REPORT krs $ 1 0 s N o t e on Inverse Bremsstrahlung in Strong E!ect:omGgnetic c;alPl I j a l a m o s scientific laboratory of the University of California LOS A L A M O S , NEW MEXICO 8 7 5 4 4 U N I T E D S T A T E S A T O M I C E N E R G Y C O M M I S S I O N a This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Atomic Energy Commission, nor any of their employees, nor any of their contrac- tors, subcontractors, or their employees, makes any warranty, express or im- plied, or assumes any legal liability or responsibility for the accuracy, com- pleteness or usefulness of any information, apparatus, product or process dis- closed, or represents that its use would not infringe privately owned rights.

399

REQUEST FOR INFORMATION Student Information System  

E-Print Network (OSTI)

REQUEST FOR INFORMATION Student Information System This form is to be used by those requesting information from the Registrar's Office. Federal privacy regulations require strict monitoring of access to student information. PERSONS OR ORGANIZATIONS MUST DEMOSTRATE THAT THE INFORMATION IS NEEDED

Thaxton, Christopher S.

400

Personal Information Request Request for Personal Information  

E-Print Network (OSTI)

Personal Information Request Request for Personal Information Request for Correction of Personal Information Personal information on this form is collected under Newfoundland and Labrador's Access to Information and Protection of Privacy (ATIPP) Act and will be used to respond to a request for, or correction

deYoung, Brad

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Exploring neighborhood and spatial information for improving scene classification  

Science Journals Connector (OSTI)

A good image descriptor is essential for the scene classification task. This work proposes an improvement for the Contextual Mean Census Transform (CMCT), an image descriptor, obtained by adding information from distant neighbors to the non-parametric ... Keywords: Contextual information, Image descriptor, Non-parametric transform, Scene classification, Spatial arrangement information

Kelly Assis De Souza Gazolli, Evandro Ottoni Teatini Salles

2014-09-01T23:59:59.000Z

402

Negotiation-based Price Discrimination for Information Goods Gabi Koifman  

E-Print Network (OSTI)

Negotiation-based Price Discrimination for Information Goods Gabi Koifman Technion, Israel in a multiagent system. The mechanism enables negotiation and evaluation of database-based information goods. As part of the work we propose various policies for dynamic pricing of information goods. We have

Gal, Avigdor

403

Contractor Past Performance Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2010) December 2010) 1 Contractor Performance Information References Federal Acquisition Regulation (FAR) Subparts 8.4 Federal Supply Schedules - 8.406-7 Contractor performance evaluation and 8.406-8 Reporting 9.1 Responsible Prospective Contractors - 9.104 Standards and 9.105 Procedures 9.4 Debarment, Suspension and Ineligibility - 9.406 Debarment and 9.407 Suspension 12.2 Special Requirements for the Acquisition of Commercial Items - 12.206 Use of past performance 12.4 Unique Requirements Regarding Terms and Conditions for Commercial Items - 12.403 Termination 13.1 Procedures - 13.106-2 Evaluation of quotations or offers 15.3 Source Selection - 15.305 Proposal evaluation 15.4 Contract Pricing - 15.407-1 Defective cost or pricing data

404

Allen Co: Proposed Penalty (2010-CW-0715) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Allen Co: Proposed Penalty (2010-CW-0715) Allen Co: Proposed Penalty (2010-CW-0715) Allen Co: Proposed Penalty (2010-CW-0715) September 8, 2010 DOE alleged in a Notice of Proposed Civil Penalty that Allen Co. failed to certify a variety of faucets as compliant with the applicable water conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable water conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Allen Co: Proposed Penalty (2010-CW-0715) More Documents & Publications Afeel: Proposed Penalty (2010-CW-07/1414) Averen: Proposed Penalty (2010-CW-0711) Amerisink: Proposed Penalty (2010-CW-0710

405

Notice of proposed rulemaking and public hearing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of proposed rulemaking and public hearing Notice of proposed rulemaking and public hearing Notice of proposed rulemaking and public hearing The U.S. Department of Energy (DOE or the Department) proposes to amend its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The majority of the changes are proposed for the categorical exclusions provisions contained in its NEPA Implementing Procedures, with a small number of related changes proposed for other provisions. These proposed changes are intended to better align the Department's regulations, particularly its categorical exclusions, with DOE's current activities and recent experiences, and to update the provisions with respect to current technologies and regulatory requirements. DOE proposes to establish 20 new categorical

406

DOE Notice of Proposed Rulemaking to Amend the External Power...  

Energy Savers (EERE)

Proposed Rulemaking to Amend the External Power Supply Test Procedure; Docket No. EERE-2014-BT-TP-0043 RIN 1904-AD36 DOE Notice of Proposed Rulemaking to Amend the External Power...

407

Microsoft Word - News Release -- Rates Initial Proposal Dec ...  

NLE Websites -- All DOE Office Websites (Extended Search)

utilities, the Bonneville Power Administration today proposed a 6.7 percent average wholesale power rate increase for the fiscal year 2016-2017 rate period. BPA is also proposing...

408

Microsoft BPA proposal extends Port Townsend Paper contract nine...  

NLE Websites -- All DOE Office Websites (Extended Search)

IMMEDIATE RELEASE Friday, Aug. 17, 2012 CONTACT: Mike Hansen, 503-230-4328 503-230-5131 BPA proposal extends Port Townsend Paper contract nine years Proposal subject to public...

409

An Update on Proposed Changes to the Energy Department's LNG...  

NLE Websites -- All DOE Office Websites (Extended Search)

An Update on Proposed Changes to the Energy Department's LNG Export Decision-Making Procedures An Update on Proposed Changes to the Energy Department's LNG Export Decision-Making...

410

Geneial Information  

Office of Legacy Management (LM)

--- _____ --- _____ ii3 ' 6 f Geneial Information su-u+./ I The Commission maintains a residue storage area known as the Airport Site at Robertson, l Missouri. This site is located immediately north of the St. Louis Municipal Airport and east of the McIknnell Aircraft Corporation Plant on Rr~wn Road in St. Louis County. Consent to use and occupy the 21.7 acre tract was obtalned by the Manhattan Dlstrlot on Marsh 2, 19&6. T!ltle uas auqubed to the property on Janwry 3, 1947 by condemnation proceeding8 for ~%20,000. It was aerquired for the purpose of storing residues fxvm the llestrehan Street Refinery and the Metal Plant at Plant 4. A coveredcoarrrete storage pad &t x 250' was constructed for storing drums. A concrete pit 202' x 42* x 16' was constructed to store radium bearing residues (K-6). Ihe area was enclosed with a chaiu-

411

Proposed experiment to measure {gamma}-rays from the thermal neutron capture of gadolinium  

SciTech Connect

Gadolinium-157 ({sup 157}Gd) has the largest thermal neutron capture cross section among any stable nuclei. The thermal neutron capture yields {gamma}-ray cascade with total energy of about 8 MeV. Because of these characteristics, Gd is applied for the recent neutrino detectors. Here, we propose an experiment to measure the multiplicity and the angular correlation of {gamma}-rays from the Gd neutron capture. With these information, we expect the improved identification of the Gd neutron capture.

Yano, Takatomi; Ou, I.; Izumi, T.; Yamaguchi, R.; Mori, T.; Sakuda, M. [Department of Physics, Okayama University, Okayama, 700-8530 (Japan)

2012-11-12T23:59:59.000Z

412

Historical. Information.  

Office of Legacy Management (LM)

Historical. Information. Historical. Information. ~ H.. 1 . General Project Rulison Manager' s Report, April. 1973 DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. PROJECT RULISON MANAGER'S R E P O R T APRIL 197.3 UNITED STATES ATOMIC ENERGY COMMISSION NEVADA OPERATIONS OFFICE Las Vegas, Nevada PREFACE , The R u l i s o n ' p r o j e c t , d e t o n a t e d September 1 0 , 1969, 'was t h e second n u c l e a r . d e t o n a t i o n designed t o d e t e r m i n e t h e economic and t e c h n i c a l f e a s i b i l i t y . of u s i n g n u c l e a r e x p l o s i v e s t o s t i m u l a t e an underground, low-productivity n a t u r a l gas r e s e r v o i r . The p r o j e c t was p a r t of t h e Atomic Energy Commission's (AEC) Plowshare program f o r d e v e l o p i n g p e a c e f u l a p p l i c a t i o n of n u c l e a r e x p l

413

BIA Request for Proposals for Climate Adaptation Grants for Tribes  

Energy.gov (U.S. Department of Energy (DOE))

Download the Bureau of Indian Affairs Request for Proposals for Climate Adaptation Grants for Tribes, due November 29.

414

Information Technology and Libraries  

E-Print Network (OSTI)

Sue Chesley Perry 196 INFORMATION TECHNOLOGY AND LIBRARIES |LITA - Library & Information Technology Association). Two of the 190 INFORMATION TECHNOLOGY AND LIBRARIES |

Hubble, Ann; Murphy, Deborah A.; Perry, Susan Chesley

2011-01-01T23:59:59.000Z

415

Geographic Information System (GIS)  

Science Journals Connector (OSTI)

The geographic information system is abranch of health information system and public health information system ...developed for the capture, storage, manipulation, analysis, and visualization of geographic ...

2008-01-01T23:59:59.000Z

416

Imperial Manufacturing: Proposed Penalty (2013-CE-5322) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Penalty (2013-CE-5322) Proposed Penalty (2013-CE-5322) Imperial Manufacturing: Proposed Penalty (2013-CE-5322) January 31, 2013 DOE alleged in a Notice of Proposed Civil Penalty that Imperial Manufacturing, Inc. failed to certify walk-in cooler or freezer components as compliant with the energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Imperial Manufacturing: Proposed Penalty (2013-CE-5322) More Documents & Publications Imperial Manufacturing: Order (2013-CE-5322)

417

International Refrigeration: Proposed Penalty (2012-CE-1510) | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

International Refrigeration: Proposed Penalty (2012-CE-1510) International Refrigeration: Proposed Penalty (2012-CE-1510) International Refrigeration: Proposed Penalty (2012-CE-1510) July 9, 2012 DOE alleged in a Notice of Proposed Civil Penalty that International Refrigeration Products failed to certify a various room air conditioners as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. International Refrigeration: Proposed Penalty (2012-CE-1510) More Documents & Publications

418

1. Project Proposal Guidelines Outline and advice for crafting a project proposal to use when setting up MEng Projects  

E-Print Network (OSTI)

1. Project Proposal Guidelines Outline and advice for crafting a project proposal to use when setting up MEng Projects as well as convincing a faculty advisor or client to work with you on a project that you write a proposal as part of your professional education and to help you end up with good project

Walter, M.Todd

419

Columbia River Basin Accords -Narrative Proposal Form 1 FY 2008-2009 F&W Program Accords (MOA) Proposal Review  

E-Print Network (OSTI)

will work closely and in collaboration with the Upper Columbia Salmon Recovery Board, BPA, Washington State&W Program Accords (MOA) Proposal Review Narrative Table 1. Proposal Metadata Project Number 2009-002-00 Proposer Bob Rose; Yakama Nation Fisheries Resources Program Short Description A Status and Trend Annual

420

Zoe Industries: Proposed Penalty (2010-CW-1405) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Penalty (2010-CW-1405) Proposed Penalty (2010-CW-1405) Zoe Industries: Proposed Penalty (2010-CW-1405) Zoe Industries, Inc., DOE Case Number: 2010-CW-1405, Notice of Proposed Civil Penalty DOE alleged that manufacturer failed to certify that each basic model of "covered products" meets the applicable water conservation standard as required by 10 C.F.R. section 430.62 and that manufacturer failed to submit a compliance statement and certification report to the DOE for each basic model of "covered products" as required by 10 C.F.R. section 430.62. In the Matter of Zoe Industries, Inc., DOE Case Number: 2010-CW-1405, Notice of Proposed Civil Penalty More Documents & Publications Hayward Industries: Proposed Penalty (2010-CE-1110) Hudson-Reed: Proposed Penalty (2010-CW-1403)

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Unionaire Group: Proposed Penalty (2011-CE-1508) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unionaire Group: Proposed Penalty (2011-CE-1508) Unionaire Group: Proposed Penalty (2011-CE-1508) Unionaire Group: Proposed Penalty (2011-CE-1508) April 22, 2011 DOE alleged in a Notice of Proposed Civil Penalty that Unionaire Group failed to certify room air conditioners as compliant with the energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Unionaire Group: Proposed Penalty (2011-CE-1508) More Documents & Publications Airwell Group: Proposed Penalty (2011-CE-1505) Crosley Group: Proposed Penalty (2011-CE-1506

422

Vehicle Technologies Office: Fact #388: September 5, 2005 Proposed Light  

NLE Websites -- All DOE Office Websites (Extended Search)

8: September 5, 8: September 5, 2005 Proposed Light Truck CAFE Standards to someone by E-mail Share Vehicle Technologies Office: Fact #388: September 5, 2005 Proposed Light Truck CAFE Standards on Facebook Tweet about Vehicle Technologies Office: Fact #388: September 5, 2005 Proposed Light Truck CAFE Standards on Twitter Bookmark Vehicle Technologies Office: Fact #388: September 5, 2005 Proposed Light Truck CAFE Standards on Google Bookmark Vehicle Technologies Office: Fact #388: September 5, 2005 Proposed Light Truck CAFE Standards on Delicious Rank Vehicle Technologies Office: Fact #388: September 5, 2005 Proposed Light Truck CAFE Standards on Digg Find More places to share Vehicle Technologies Office: Fact #388: September 5, 2005 Proposed Light Truck CAFE Standards on AddThis.com...

423

Proposed Project: Plains & Eastern Clean Line | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Eastern Clean Line Proposed Project: Plains & Eastern Clean Line On June 10, 2010, the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In response, Clean Line Energy Partners, LLC submitted an application for its Plains & Eastern Clean Line project. DOE has concluded that Clean Line's proposal was responsive to the RFP, and it is currently under consideration. The proposed Plains & Eastern Clean Line project (the proposed project) would include an overhead +/- 600 kV direct current electric transmission system and associated facilities with the capacity to deliver approximately

424

National Environmental Information Infrastructure  

E-Print Network (OSTI)

National Environmental Information Infrastructure: Reference Architecture Contributing Information Infrastructure: Reference Architecture v1.1 Environmental Information Programme Publication Series: Reference Architecture, Environmental Information Programme Publication Series, document no. 4, Bureau

Greenslade, Diana

425

Final Information Quality Bulletin for Peer Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04 04 OFFICE OF MANAGEMENT AND BUDGET Final Information Quality Bulletin for Peer Review INTRODUCTION This Bulletin establishes that important scientific information shall be peer reviewed by qualified specialists before it is disseminated by the federal government. We published a proposed Bulletin on September 15, 2003. Based on public comments, we published a revised proposal for additional comment on April 28, 2004. We are now finalizing the April version, with minor revisions responsive to the public's comments. The purpose of the Bulletin is to enhance the quality and credibility of the government's scientific information. We recognize that different types of peer review are appropriate for different types of information. Under this Bulletin, agencies are granted broad

426

An Information Calculus for Information Retrieval  

E-Print Network (OSTI)

An Information Calculus for Information Retrieval C.J. van Rijsbergen Computing Science Department not whistle it in mathematics either' Introduction In the beginning there was information, later there was probability, and very much later there was logic. Information is and always has been an elusive concept

Jose, Joemon M.

427

Information Governance Freedom of Information Request Form  

E-Print Network (OSTI)

Information Governance Freedom of Information Request Form foi@salford.ac.uk http://www.infogov.salford.ac.uk Details of the applicant Name: Address: Post code: Tel. No.: Email: Description of information requested Please provide a description of the information you would like to receive, please be as specific

Romano, Daniela

428

PUBLIC INFORMATION ANNEX I -PUBLIC INFORMATION  

E-Print Network (OSTI)

ANNEX I PUBLIC INFORMATION #12;ANNEX I - PUBLIC INFORMATION 11/12/2013 v. 2.0 Page I-1 PROMULGATION STATEMENT Annex I: Public Information, and contents within, is a guide to how the University maintains public information during an incident. The Annex is written in support of the Texas A&M University (TAMU

429

2007 Wholesale Power Rate Case Final Proposal : Market Price Forecast Study.  

SciTech Connect

This study presents BPA's market price forecasts for the Final Proposal, which are based on AURORA modeling. AURORA calculates the variable cost of the marginal resource in a competitively priced energy market. In competitive market pricing, the marginal cost of production is equivalent to the market-clearing price. Market-clearing prices are important factors for informing BPA's power rates. AURORA was used as the primary tool for (a) estimating the forward price for the IOU REP Settlement benefits calculation for fiscal years (FY) 2008 and 2009, (b) estimating the uncertainty surrounding DSI payments and IOU REP Settlements benefits, (c) informing the secondary revenue forecast and (d) providing a price input used for the risk analysis. For information about the calculation of the secondary revenues, uncertainty regarding the IOU REP Settlement benefits and DSI payment uncertainty, and the risk run, see Risk Analysis Study WP-07-FS-BPA-04.

United States. Bonneville Power Administration.

2006-07-01T23:59:59.000Z

430

Automated Information Extraction to Support Biomedical Decision Model Construction: A Preliminary Design  

E-Print Network (OSTI)

We propose an information extraction framework to support automated construction of decision models in biomedicine. Our proposed technique classifies text-based documents from a large biomedical literature repository, e.g., ...

Li, Xiaoli

431

Geographic Information System | Open Energy Information  

Open Energy Info (EERE)

Geographic Information System Geographic Information System Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Geographic Information System Details Activities (24) Areas (11) Regions (4) NEPA(0) Exploration Technique Information Exploration Group: Data and Modeling Techniques Exploration Sub Group: Data Techniques Parent Exploration Technique: Data Techniques Information Provided by Technique Lithology: Any mapable information Stratigraphic/Structural: Any mapable information Hydrological: Any mapable information Thermal: Any mapable information Cost Information Low-End Estimate (USD): 70.007,000 centUSD 0.07 kUSD 7.0e-5 MUSD 7.0e-8 TUSD / hour Median Estimate (USD): 80.008,000 centUSD 0.08 kUSD 8.0e-5 MUSD 8.0e-8 TUSD / hour High-End Estimate (USD): 150.0015,000 centUSD

432

Site Support Contractor Solicitation - Information Technology and  

NLE Websites -- All DOE Office Websites (Extended Search)

Information Technology Operations and Maintenance Services (ITOMS) – DE-SOL-0003719 Information Technology Operations and Maintenance Services (ITOMS) – DE-SOL-0003719 Solicitation DE-SOL-0003719 - Contract DE-DT0004246 has been awarded to Alliant Enterprises JV, LLC in response to the Information Technology Operations and Maintenance Support Services (ITOMS) solicitation (DE-SOL-0003719) The electronic reading room is part of NETL's strategy to provide information that may benefit potential offerors in preparing their proposal. The information is provided to assist the reader in gaining an enhanced understanding of the requirement. NETL has completed the Market Research related to performing the Information Technology Support Services requirement. Based on the Market Research and the received concurrence from the Small Business

433

2007 Wholesale Power Rate Case Initial Proposal : Wholesale Power Rate Development Study.  

SciTech Connect

The Wholesale Power Rate Development Study (WPRDS) calculates BPA proposed rates based on information either developed in the WPRDS or supplied by the other studies that comprise the BPA rate proposal. All of these studies, and accompanying documentation, provide the details of computations and assumptions. In general, information about loads and resources is provided by the Load Resource Study (LRS), WP-07-E-BPA-01, and the LRS Documentation, WP-07-E-BPA-01A. Revenue requirements information, as well as the Planned Net Revenues for Risk (PNNR), is provided in the Revenue Requirement Study, WP-07-E-BPA-02, and its accompanying Revenue Requirement Study Documentation, WP-07-E-BPA-02A and WP-07-E-BPA-02B. The Market Price Forecast Study (MPFS), WP-07-E-BPA-03, and the MPFS Documentation, WP-07-E-BPA-03A, provide the WPRDS with information regarding seasonal and diurnal differentiation of energy rates, as well information regarding monthly market prices for Demand Rates. In addition, this study provides information for the pricing of unbundled power products. The Risk Analysis Study, WP-07-E-BPA-04, and the Risk Analysis Study Documentation, WP-07-E-BPA-04A, provide short-term balancing purchases as well as secondary energy sales and revenue. The Section 7(b)(2) Rate Test Study, WP-07-E-BPA-06, and the Section 7(b)(2) Rate Test Study Documentation, WP-07-E-BPA-06A, implement Section 7(b)(2) of the Northwest Power Act to ensure that BPA preference customers firm power rates applied to their general requirements are no higher than rates calculated using specific assumptions in the Northwest Power Act.

United States. Bonneville Power Administration.

2007-11-01T23:59:59.000Z

434

Schott Gemtron: Proposed Penalty (2013-CE-5358) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Penalty (2013-CE-5358) Proposed Penalty (2013-CE-5358) Schott Gemtron: Proposed Penalty (2013-CE-5358) March 26, 2013 DOE alleged in a Notice of Proposed Civil Penalty that Schott Gemtron Corp. failed to certify a variety of walk-in cooler or freezer doors as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Schott Gemtron: Proposed Penalty (2013-CE-5358) More Documents & Publications Schott Gemtron: Order (2013-CE-5358) R-Cold: Proposed Penalty (2013-CE-5354)

435

GE Appliances: Proposed Penalty (2010-CE-2113) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GE Appliances: Proposed Penalty (2010-CE-2113) GE Appliances: Proposed Penalty (2010-CE-2113) GE Appliances: Proposed Penalty (2010-CE-2113) September 8, 2010 DOE alleged in a Notice of Proposed Civil Penalty that General Electric Appliances failed to certify a variety of dehumidifiers as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. GE Appliances: Proposed Penalty (2010-CE-2113) More Documents & Publications De'Longhi USA: Proposed Penalty (2010-CE-2114)

436

GE Lighting Solutions: Proposed Penalty (2013-SE-4901) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GE Lighting Solutions: Proposed Penalty (2013-SE-4901) GE Lighting Solutions: Proposed Penalty (2013-SE-4901) GE Lighting Solutions: Proposed Penalty (2013-SE-4901) March 5, 2013 DOE alleged in a Notice of Proposed Civil Penalty that General Electric Lighting Solutions manufactured and distributed noncompliant traffic signal modules in the U.S. Federal law subjects manufacturers and private labelers to civil penalties if those parties distribute in the U.S. products that do not meet applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. GE Lighting Solutions: Proposed Penalty (2013-SE-4901) More Documents & Publications Act One: NPCP (2013-CE-49001) Excellence Opto: Proposed Penalty (2013-CE-49002)

437

GE Lighting Solutions: Proposed Penalty (2013-SE-4901) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Penalty (2013-SE-4901) Proposed Penalty (2013-SE-4901) GE Lighting Solutions: Proposed Penalty (2013-SE-4901) March 5, 2013 DOE alleged in a Notice of Proposed Civil Penalty that General Electric Lighting Solutions manufactured and distributed noncompliant traffic signal modules in the U.S. Federal law subjects manufacturers and private labelers to civil penalties if those parties distribute in the U.S. products that do not meet applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. GE Lighting Solutions: Proposed Penalty (2013-SE-4901) More Documents & Publications Watermark: Proposed Penalty (2011-SW-2908) Act One: NPCP (2013-CE-49001)

438

Satco: Proposed Penalty (2013-CE-2702) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Penalty (2013-CE-2702) Proposed Penalty (2013-CE-2702) Satco: Proposed Penalty (2013-CE-2702) Januray 30, 2013 DOE alleged in a Notice of Proposed Civil Penalty that Satco Products, Inc. failed to certify a variety of general service fluorescent lamps as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Satco: Proposed Penalty (2013-CE-2702) More Documents & Publications Satco: Order (2013-CE-2702) PQL: Proposed Penalty (2013-CE-27001)

439

Stiebel Eltron: Proposed Penalty (2010-CE-1711) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Stiebel Eltron: Proposed Penalty (2010-CE-1711) Stiebel Eltron: Proposed Penalty (2010-CE-1711) Stiebel Eltron: Proposed Penalty (2010-CE-1711) September 7, 2010 DOE alleged in a Notice of Proposed Civil Penalty that Stiebel Eltron, Inc. failed to certify a variety of water heaters as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Stiebel Eltron: Proposed Penalty (2010-CE-1711) More Documents & Publications Stiebel Eltron: Order (2010-CE-1711) Sanyo Electric: Proposed Penalty (2010-CE-1210)

440

Neptun Light: Proposed Penalty (2012-SE-3504) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Neptun Light: Proposed Penalty (2012-SE-3504) Neptun Light: Proposed Penalty (2012-SE-3504) Neptun Light: Proposed Penalty (2012-SE-3504) May 2, 2013 DOE alleged in a Notice of Proposed Civil Penalty that Neptun Light, Inc. failed to certify a variety of medium base compact fluorescent lamps as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Neptun Light: Proposed Penalty (2012-SE-3504) More Documents & Publications Neptun Light: Order (2012-SE-3504) Excellence Opto: Proposed Penalty (2013-CE-49002)

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Sylvania: Proposed Penalty (2013-CE-2603) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sylvania: Proposed Penalty (2013-CE-2603) Sylvania: Proposed Penalty (2013-CE-2603) Sylvania: Proposed Penalty (2013-CE-2603) February 27, 2013 DOE alleged in a Notice of Proposed Civil Penalty that Osram Sylvania Inc. failed to certify a variety of general service fluorescent lamps as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Sylvania: Proposed Penalty (2013-CE-2603) More Documents & Publications Sylvania: Order (2013-CE-2603) PQL: Proposed Penalty (2013-CE-27001)

442

AM Conservation: Proposed Penalty (2010-CW-1415) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AM Conservation: Proposed Penalty (2010-CW-1415) AM Conservation: Proposed Penalty (2010-CW-1415) AM Conservation: Proposed Penalty (2010-CW-1415) September 8, 2010 DOE alleged in a Notice of Proposed Civil Penalty that AM Conservation Group, Inc. failed to certify a variety of showerheads as compliant with the applicable water conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable water conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. AM Conservation: Proposed Penalty (2010-CW-1415) More Documents & Publications Afeel: Proposed Penalty (2010-CW-07/1414)

443

Barclay Products: Proposed Penalty (2013-CW-3005) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Barclay Products: Proposed Penalty (2013-CW-3005) Barclay Products: Proposed Penalty (2013-CW-3005) Barclay Products: Proposed Penalty (2013-CW-3005) February 7, 2013 DOE alleged in a Notice of Proposed Civil Penalty that Barclay Products, Ltd. failed to certify a variety of water closets as compliant with the applicable water conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable water conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Barclay Products: Proposed Penalty (2013-CW-3005) More Documents & Publications Barclay Products: Order (2013-CW-3005) Fagor America: Proposed Penalty (2013-CEW-19001)

444

Custom Coolers: Proposed Penalty (2013-CE-5315) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Penalty (2013-CE-5315) Proposed Penalty (2013-CE-5315) Custom Coolers: Proposed Penalty (2013-CE-5315) January 31, 2013 DOE alleged in a Notice of Proposed Civil Penalty that Custom Coolers, LLC, failed to certify walk-in cooler or freezer (WICF) components as compliant with the energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Custom Coolers: Proposed Penalty (2013-CE-5315) More Documents & Publications Custom Coolers: Order (2013-CE-5315) Imperial Manufacturing: Proposed Penalty (2013-CE-5322)

445

Mackle Company: Proposed Penalty (2010-SE-0106) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Mackle Company: Proposed Penalty (2010-SE-0106) Mackle Company: Proposed Penalty (2010-SE-0106) Mackle Company: Proposed Penalty (2010-SE-0106) June 14, 2010 DOE alleged in a Notice of Proposed Civil Penalty that The Mackle Company, Inc., sold and/or distributed noncompliant refrigerators, refrigerator-freezers, and freezers in the U.S. Federal law subjects manufacturers and private labelers to civil penalties if those parties distribute in the U.S. products that do not meet applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. The Mackle Company: Proposed Penalty (2010-SE-0106) More Documents & Publications Mackle Company: Proposed Penalty (2011-CE-2102) Mackle Company: Order (2010-SE-0106)

446

Quietside Corp: Proposed Penalty (2010-CE-1710) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quietside Corp: Proposed Penalty (2010-CE-1710) Quietside Corp: Proposed Penalty (2010-CE-1710) Quietside Corp: Proposed Penalty (2010-CE-1710) September 8, 2010 DOE alleged in a Notice of Proposed Civil Penalty that Quietside Corporation failed to certify a variety of water heaters as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Quietside Corp: Proposed Penalty (2010-CE-1710) More Documents & Publications Quietside Corp: Order (2010-CE-1710) Sanyo Electric: Proposed Penalty (2010-CE-1210)

447

Sylvane: Proposed Penalty (2013-CE-36005) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sylvane: Proposed Penalty (2013-CE-36005) Sylvane: Proposed Penalty (2013-CE-36005) Sylvane: Proposed Penalty (2013-CE-36005) October 16, 2013 DOE alleged in a Notice of Proposed Civil Penalty that Sylvane, Inc. failed to certify at least two dehumidifier basic models under the PrimeAire brand as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Sylvane: Proposed Penalty (2013-CE-36005) More Documents & Publications Sylvane: Order (2013-CE-36005) R-Cold: Proposed Penalty (2013-CE-5354)

448

Trojan: Proposed Penalty (2011-CE-2704) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Trojan: Proposed Penalty (2011-CE-2704) Trojan: Proposed Penalty (2011-CE-2704) Trojan: Proposed Penalty (2011-CE-2704) April 22, 2011 DOE alleged in a Notice of Proposed Civil Penalty that Trojan, Inc. failed to certify a variety of incandescent reflector lamps as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Trojan: Proposed Penalty (2011-CE-2704) More Documents & Publications Trojan: Order (2011-CE-2704) Turolight: Proposed Penalty (2011-CE-2705)

449

American Valve: Proposed Penalty (2010-CW-1411) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

American Valve: Proposed Penalty (2010-CW-1411) American Valve: Proposed Penalty (2010-CW-1411) American Valve: Proposed Penalty (2010-CW-1411) September 8, 2010 DOE alleged in a Notice of Proposed Civil Penalty that American Valve, Inc. failed to certify a variety of showerheads as compliant with the applicable water conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable water conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. American Valve: Proposed Penalty (2010-CW-1411) More Documents & Publications American Valve: Order (2010-CW-1411) Afeel: Proposed Penalty (2010-CW-07/1414)

450

EA-1628: Construction and Operation of a Proposed Lignocellulosic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

628: Construction and Operation of a Proposed Lignocellulosic 628: Construction and Operation of a Proposed Lignocellulosic Biorefinery, Emmetsburg, Iowa EA-1628: Construction and Operation of a Proposed Lignocellulosic Biorefinery, Emmetsburg, Iowa SUMMARY This EA evaluated the potential environmental impacts of a DOE proposal to provide financial assistance (the Proposed Action) to POET Project LIBERTY, LLC (POET) for the construction and operation of the lignocellulosic ethanol production facility (Project LIBERTY) near the City of Emmetsburg, Iowa. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 29, 2008 EA-1628: Finding of No Significant Impact Construction and Operation of a Proposed Lignocellulosic Biorefinery, POET Project LIBERTY, LLC, Emmetsburg, Iowa September 29, 2008

451

Southeast Cooler: Proposed Penalty (2013-CE-5331) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Penalty (2013-CE-5331) Proposed Penalty (2013-CE-5331) Southeast Cooler: Proposed Penalty (2013-CE-5331) January 31, 2013 DOE alleged in a Notice of Proposed Civil Penalty that Southeast Cooler Corp. failed to certify walk-in cooler or freezer components as compliant with the energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Southeast Cooler: Proposed Penalty (2013-CE-5331) More Documents & Publications Southeast Cooler: Order (2013-CE-5331) Dade Engineering: Proposed Penalty (2013-CE-5316)

452

Topstar: Proposed Penalty (2011-CE-2703) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Topstar: Proposed Penalty (2011-CE-2703) Topstar: Proposed Penalty (2011-CE-2703) Topstar: Proposed Penalty (2011-CE-2703) April 22, 2011 DOE alleged in a Notice of Proposed Civil Penalty that Topstar International, Inc. failed to certify a variety of incandescent reflector lamps as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Topstar: Proposed Penalty (2011-CE-2703) More Documents & Publications Topstar International: Order (2011-CE-2703) Turolight: Proposed Penalty (2011-CE-2705)

453

Sylvane: Proposed Penalty (2013-CE-36005) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposed Penalty (2013-CE-36005) Proposed Penalty (2013-CE-36005) Sylvane: Proposed Penalty (2013-CE-36005) October 16, 2013 DOE alleged in a Notice of Proposed Civil Penalty that Sylvane, Inc. failed to certify at least two dehumidifier basic models under the PrimeAire brand as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Sylvane: Proposed Penalty (2013-CE-36005) More Documents & Publications Sylvane: Order (2013-CE-36005) R-Cold: Proposed Penalty (2013-CE-5354)

454

Keystone: Proposed Penalty (2013-CE-2601) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Keystone: Proposed Penalty (2013-CE-2601) Keystone: Proposed Penalty (2013-CE-2601) Keystone: Proposed Penalty (2013-CE-2601) February 7, 2013 DOE alleged in a Notice of Proposed Civil Penalty that Keystone Technologies, LLC failed to certify a variety of fluorescent lamp ballasts as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Keystone: Proposed Penalty (2013-CE-2601) More Documents & Publications Keystone: Order (2013-CE-2601) Basement Systems: Proposed Penalty (2010-CE-2110)

455

Hicon: Proposed Penalty (2013-SE-1426) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Hicon: Proposed Penalty (2013-SE-1426) Hicon: Proposed Penalty (2013-SE-1426) Hicon: Proposed Penalty (2013-SE-1426) July 8, 2013 DOE alleged in a Notice of Proposed Civil Penalty that Ningbo Hicon International Industry Company, Ltd. manufactured and distributed noncompliant freezer basic model BD-200 in the U.S. Federal law subjects manufacturers and private labelers to civil penalties if those parties distribute in the U.S. products that do not meet applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Hicon: Proposed Penalty (2013-SE-1426) More Documents & Publications Hicon: Noncompliance Determination (2013-SE-1426) Hicon: Order (2013-SE-1426) Haier: Proposed Penalty

456

Mackle Company: Proposed Penalty (2010-SE-0106) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mackle Company: Proposed Penalty (2010-SE-0106) Mackle Company: Proposed Penalty (2010-SE-0106) Mackle Company: Proposed Penalty (2010-SE-0106) June 14, 2010 DOE alleged in a Notice of Proposed Civil Penalty that The Mackle Company, Inc., sold and/or distributed noncompliant refrigerators, refrigerator-freezers, and freezers in the U.S. Federal law subjects manufacturers and private labelers to civil penalties if those parties distribute in the U.S. products that do not meet applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. The Mackle Company: Proposed Penalty (2010-SE-0106) More Documents & Publications Mackle Company: Proposed Penalty (2011-CE-2102) Mackle Company: Order (2010-SE-0106)

457

Acme Kitchenettes: Proposed Penalty (2011-CE-1406) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Penalty (2011-CE-1406) Proposed Penalty (2011-CE-1406) Acme Kitchenettes: Proposed Penalty (2011-CE-1406) April 22, 2011 DOE alleged in a Notice of Proposed Civil Penalty that Acme Kitchenettes Corp. failed to certify a variety of refrigerators as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Acme Kitchenettes: Proposed Penalty (2011-CE-1406) More Documents & Publications Acme Kitchenettes: Order (2011-CE-1406) Mackle Company: Proposed Penalty (2011-CE-2102)

458

Microsoft Word - Proposal Form Description and Guidelines-rev.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Form Description and Form Description and Guidelines Please read the Proposal Form Description and Guidelines entirely before submitting a CNM Proposal You must register online through the User Facility Registration System BEFORE submitting a CNM Proposal. All individuals coming to Argonne must register, receive a badge number, and receive access permission for arrival. You will receive a badge number by e-mail. To log on to the Online User Proposal System for the first time, enter your badge number and also use your badge number for your initial password. Once you are logged in, the system will ask you to change your password. The CNM proposal has seven sections, each accessed by a tab on the online form. Note: All proposals MUST be submitted through the web-based system.

459

BSH: Proposed Penalty (2013-CE-2001) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BSH: Proposed Penalty (2013-CE-2001) BSH: Proposed Penalty (2013-CE-2001) BSH: Proposed Penalty (2013-CE-2001) April 2, 2013 DOE alleged in a Notice of Proposed Civil Penalty that BSH Home Appliances Corp. failed to certify a variety of residential clothes washers as compliant with the applicable energy/water conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy/water conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. BSH: Proposed Penalty (2013-CE-2001) More Documents & Publications BSH: Order (2013-CE-2001) Fagor America: Proposed Penalty (2013-CEW-19001)

460

Leotek: Proposed Penalty (2013-CE-4903) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Leotek: Proposed Penalty (2013-CE-4903) Leotek: Proposed Penalty (2013-CE-4903) Leotek: Proposed Penalty (2013-CE-4903) July 30, 2013 DOE alleged in a Notice of Proposed Civil Penalty that Leotek Electronics USA Corp. failed to certify a variety of traffic signal modules and pedestrian modules as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Leotek: Proposed Penalty (2013-CE-4903) More Documents & Publications Leotek: Order (2013-CE-4903) Excellence Opto: Proposed Penalty (2013-CE-49002)

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Sanyo Electric: Proposed Penalty (2010-CE-1210) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sanyo Electric: Proposed Penalty (2010-CE-1210) Sanyo Electric: Proposed Penalty (2010-CE-1210) Sanyo Electric: Proposed Penalty (2010-CE-1210) September 8, 2010 DOE alleged in a Notice of Proposed Civil Penalty that Sanyo Electric Co. failed to certify a variety of refrigerators, refrigerator-freezers, and freezers as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Sanyo Electric: Proposed Penalty (2010-CE-1210) More Documents & Publications Hisense USA: Proposed Penalty (2010-CE-1211)

462

American Power: Proposed Penalty (2010-CE-0911) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

American Power: Proposed Penalty (2010-CE-0911) American Power: Proposed Penalty (2010-CE-0911) American Power: Proposed Penalty (2010-CE-0911) September 8, 2010 DOE alleged in a Notice of Proposed Civil Penalty that American Power Solutions, Inc. failed to certify a general service fluorescent lamp as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. American Power: Proposed Penalty (2010-CE-0911) More Documents & Publications Engineered Solutions: Proposed Penalty (2010-CE-2112)

463

USA Manufacturing: Proposed Penalty (2013-CE-5336) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Penalty (2013-CE-5336) Proposed Penalty (2013-CE-5336) USA Manufacturing: Proposed Penalty (2013-CE-5336) January 31, 2013 DOE alleged in a Notice of Proposed Civil Penalty that USA Manufacturing failed to certify walk-in cooler or freezer components as compliant with the energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. USA Manufacturing: Proposed Penalty (2013-CE-5336) More Documents & Publications USA Manufacturing: Order (2013-CE-5336) Amerikooler: Proposed Penalty (2013-CE-5307)

464

Paragon Sales: Proposed Penalty (2012-CE-1417) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Paragon Sales: Proposed Penalty (2012-CE-1417) Paragon Sales: Proposed Penalty (2012-CE-1417) Paragon Sales: Proposed Penalty (2012-CE-1417) July 9, 2012 DOE alleged in a Notice of Proposed Civil Penalty that Paragon Sales Co., Inc., failed to certify certain Liebherr residential freezers as compliant with the energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Paragon Sales: Proposed Penalty (2012-CE-1417) More Documents & Publications Paragon Sales: Order (2012-CE-1417) American Standard: Proposed Penalty (2013-CW-3001)

465

Engineered Solutions: Proposed Penalty (2010-CE-2112) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Engineered Solutions: Proposed Penalty (2010-CE-2112) Engineered Solutions: Proposed Penalty (2010-CE-2112) Engineered Solutions: Proposed Penalty (2010-CE-2112) September 8, 2010 DOE alleged in a Notice of Proposed Civil Penalty that Engineered Solutions, Inc. failed to certify a dehumidifier as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Engineered Solutions: Proposed Penalty (2010-CE-2112) More Documents & Publications Basement Systems: Proposed Penalty (2010-CE-2110)

466

AGA Marvel: Proposed Penalty (2011-CE-1905) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Penalty (2011-CE-1905) Proposed Penalty (2011-CE-1905) AGA Marvel: Proposed Penalty (2011-CE-1905) April 22, 2011 DOE alleged in a Notice of Proposed Civil Penalty that AGA Marvel (also AGA Heartland and Northland Corp.) failed to certify a variety of dishwashers as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. AGA Marvel: Proposed Penalty (2011-CE-1905) More Documents & Publications AGA Marvel: Order (2011-CE-1905) Smeg USA: Proposed Penalty (2011-CE-14/1909)

467

Crosley Group: Proposed Penalty (2011-CE-1506) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Penalty (2011-CE-1506) Proposed Penalty (2011-CE-1506) Crosley Group: Proposed Penalty (2011-CE-1506) April 22, 2011 DOE alleged in a Notice of Proposed Civil Penalty that Crosley Group failed to certify a variety of room air conditioners as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Crosley Group: Proposed Penalty (2011-CE-1506) More Documents & Publications Crosley Group: Order (2011-CE-1506) Airwell Group: Proposed Penalty (2011-CE-1505)

468

Basement Systems: Proposed Penalty (2010-CE-2110) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Basement Systems: Proposed Penalty (2010-CE-2110) Basement Systems: Proposed Penalty (2010-CE-2110) Basement Systems: Proposed Penalty (2010-CE-2110) September 8, 2010 DOE alleged in a Notice of Proposed Civil Penalty that Basement Systems, Inc. failed to certify a variety of dehumidifier as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Basement Systems: Proposed Penalty (2010-CE-2110) More Documents & Publications De'Longhi USA: Proposed Penalty (2010-CE-2114)

469

Paragon Sales: Proposed Penalty (2012-CE-1417) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Paragon Sales: Proposed Penalty (2012-CE-1417) Paragon Sales: Proposed Penalty (2012-CE-1417) Paragon Sales: Proposed Penalty (2012-CE-1417) July 9, 2012 DOE alleged in a Notice of Proposed Civil Penalty that Paragon Sales Co., Inc., failed to certify certain Liebherr residential freezers as compliant with the energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Paragon Sales: Proposed Penalty (2012-CE-1417) More Documents & Publications Paragon Sales: Order (2012-CE-1417) American Standard: Proposed Penalty (2013-CW-3001)

470

Watermark: Proposed Penalty (2011-SW-2908) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Penalty (2011-SW-2908) Proposed Penalty (2011-SW-2908) Watermark: Proposed Penalty (2011-SW-2908) May 10, 2012 DOE alleged in a Notice of Proposed Civil Penalty that Watermark Designs, Ltd. manufactured and distributed noncompliant showerhead basic model SH-FAL90 in the U.S. Federal law subjects manufacturers and private labelers to civil penalties if those parties distribute in the U.S. products that do not meet applicable water conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Watermark: Proposed Penalty (2011-SW-2908) More Documents & Publications Watermark: Order (2011-SW-2908) Watermark: Noncompliance Determination (2011-SW-2908) ET Industries: Proposed Penalty (2012-SE-2902

471

Energy-conservation program: notice of proposed rulemaking  

SciTech Connect

A notice of proposed rulemaking, proposing energy efficiency standards for refrigerators, refrigerator-freezers, freezers, clothes dryers, water heaters, room air conditioners, home heating equipment (not including furnaces) kitchen ranges and ovens, and central air conditioners ispresented. Comments are invited and the procedure for public comment is detailed. Issues included and presented in the proposed rulemaking are: determination of energy efficiency levels, macro-economic analysis, certification and enforcement, effect on other law, small business exemptions, environmental assessment, and regulatory analysis. (MCW)

Not Available

1980-06-12T23:59:59.000Z

472

DOE Issues Final Request for Proposal for Portsmouth Gaseous...  

Energy Savers (EERE)

The U.S. Department of Energy today issued a Final Request for Proposal (RFP), for the continued performance of infrastructure support services at the Portsmouth Gaseous Diffusion...

473

Notice of Proposed Rulemaking, Federal Register, 75 FR 29933...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

details the notice of proposed rulemaking for Energy Efficiency and Sustainable Design Standards for New Federal Buildings, which was published in the Federal Register on...

474

Present Status of the TAC Proton Accelerator Proposal  

SciTech Connect

Recently, conceptual design of the Turkic Accelerator Center (TAC) proposal was completed. The main goal of this proposal is a charm factory that consist of a linac-ring type electron-positron collider. In addition, synchrotron radiation from the positron ring, free electron laser from the electron linac and a GeV energy proton accelerator are proposed. The Project related with this proposal has been accepted by the Turkish State Planning Committee. It is planned that the Tecnical Design Repotr of the TAC will have been written in the next three years. In this study we consider main parameters of the TAC proton accelerator, secondary beams and their applications.

Akkus, B. [Istanbul Ueniversitesi, Istanbul (Turkey); Bilgin, P. S.; Caliskan, A.; Yilmaz, M. [Gazi Ueniversitesi, Ankara (Turkey); Sultansoy, S. [Gazi Ueniversitesi, Ankara (Turkey); Institute of Physics, Baku (Azerbaijan)

2007-04-23T23:59:59.000Z

475

Sensitivity Analysis of Proposed LNG liquefaction Processes for LNG FPSO.  

E-Print Network (OSTI)

?? The four liquefaction processes proposed as a good candidate for LNG FPSO are simulated and evaluated. These processes include a single mixed refrigerant (SMR), (more)

Pwaga, Sultan Seif

2011-01-01T23:59:59.000Z

476

Energy Department Authorizes Dominion's Proposed Cove Point Facility...  

Energy Savers (EERE)

Liquefied Natural Gas Energy Department Authorizes Third Proposed Facility to Export Liquefied Natural Gas Energy Department Authorizes Jordan Cove to Export Liquefied Natural...

477

Notice of Proposed Rulemaking, Federal Register, 75 FR 63404...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Document details the notice of proposed rulemaking for Fossil Fuel-Generated Energy Consumption Reduction for New Federal Buildings and Major Renovations of Federal Buildings,...

478

Proposed Rule Correction, Federal Register, 75 FR 66008, October...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

a correction to the notice of proposed rulemaking for Fossil Fuel-Generated Energy Consumption Reduction for New Federal Buildings and Major Renovations of Federal Buildings,...

479

DOE Issues Final Request for Proposal for Oak Ridge Transuranic...  

Office of Environmental Management (EM)

Oak Ridge Transuranic Waste Processing Center Services DOE Issues Final Request for Proposal for Oak Ridge Transuranic Waste Processing Center Services October 14, 2014 - 2:16pm...

480

Department of Energy Issues Final Request for Proposals for Savannah...  

Energy Savers (EERE)

and disposition of liquid wastes, and the operational closure of the LW storage tanks. The RFP describes the criteria DOE will use in evaluating the proposals received. The...

Note: This page contains sample records for the topic "aaf information proposal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

2014-02-21 Issuance: Proposed Determination of Computer Servers...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a Covered Consumer Product; Withdrawal 2014-02-21 Issuance: Proposed Determination of Computer Servers as a Covered Consumer Product; Withdrawal This document is a pre-publication...

482

President's 2014 Budget Proposes Critical Investments in Clean...  

Energy Savers (EERE)

sources of renewable electricity generation such as wind, solar, water power, and geothermal energy. The proposed budget also includes 949 million for energy savings programs...

483

DOE's Idaho National Lab Issues Request for Proposals for Engineering...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of Energy's Idaho National Laboratory today issued a Request for Proposals (RFP) for engineering services in support of development of NGNP. This RFP is for pre-conceptual...

484

FACULTY SENATE OFFICE 03/12 Program Proposal Cover Page  

E-Print Network (OSTI)

: ____________________________________________________ Classification of instruction program (CIP) code: CIP Index: _________________________________________________ CIP code (if different from above): CIP Index or Name of the proposal. CIP index must be included for Ma

Rhode Island, University of

485

Fact #589: September 21, 2009 Proposed Fuel Economy and Greenhouse...  

Energy Savers (EERE)

(NHTSA) jointly announced a proposal to establish national standards for greenhouse gas (GHG) emissions and Corporate Average Fuel Economy (CAFE). The standards would apply to...

486

DOE Publishes Notice of Proposed Rulemaking for Residential Water...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Water Heater and Certain Commercial Water Heater Test Procedures DOE Publishes Notice of Proposed Rulemaking for Residential Water Heater and Certain Commercial Water Heater Test...

487

DOE Publishes Notice of Proposed Rulemaking for Direct Heating...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Direct Heating Equipment and Pool Heater Test Procedures DOE Publishes Notice of Proposed Rulemaking for Direct Heating Equipment and Pool Heater Test Procedures October 24, 2013 -...

488

Euro Chef USA: Proposed Penalty (2014-CE-23004)  

Energy.gov (U.S. Department of Energy (DOE))

DOE alleged in a Notice of Proposed Civil Penalty that Euro Chef USA Inc. failed to certify cooking products as compliant with the applicable energy conservation standards.

489

DOE Publishes Notice of Proposed Rulemaking for Commercial Refrigerati...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commercial Refrigeration Equipment Test Procedure DOE Publishes Notice of Proposed Rulemaking for Commercial Refrigeration Equipment Test Procedure October 28, 2013 - 12:00am...

490

DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regarding the Compliance Date for the Dehumidifier Test Procedure DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure...

491

BPA proposes rate increase to bolster federal power and transmission...  

NLE Websites -- All DOE Office Websites (Extended Search)

BPA-proposes-rate-increase-to-bolster-federal-power-and-transmission-systems Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects...

492

Notice of proposed rulemaking, Energy Efficiency and Sustainable...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

In these comments, part I discusses the importance of improving the energy efficiency and sustainability of Federal buildings through completion of the above-described proposed...

493

100-D/H Remedial Investigation/ Feasibility Study /Proposed...  

NLE Websites -- All DOE Office Websites (Extended Search)

Remedial Investigation Feasibility Study Proposed Plan Nina Menard Washington State Department of Ecology 100-DH RIFSPP * Received Draft RIFSPP on December 14, 2012 *...

494

EIS-0030: Bonneville Power Administration's Proposed FY 1980 Program  

Energy.gov (U.S. Department of Energy (DOE))

The Bonneville Power Administration developed this EIS to evaluate the environmental impacts of the proposed fiscal year 1980 construction and maintenance program.

495

CONVENTION ON SUPPLEMENTARY COMPENSATION NOTICE OF PROPOSED RULEMAKING...  

Office of Environmental Management (EM)

(NOPR), which sets forth proposed regulations to establish the retrospective risk pooling program called for under section 934 of EISA. CSC NOPR More Documents & Publications...

496

DOE Publishes Supplemental Notice of Proposed Rulemaking for...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Notice of Proposed Rulemaking for Alternative Efficiency Determination Methods and Alternative Rating Methods October 22, 2013 - 12:00am Addthis The Department of Energy has...

497

Proposal Submittal and Scheduling Procedures for Research | Stanford...  

NLE Websites -- All DOE Office Websites (Extended Search)

Multiple proposals from members of the same research team will be flagged during the peer review process (may be combined and limited in lifetime andor beam time...

498

Alcator C-Mod Mini-Proposal MP No.  

NLE Websites -- All DOE Office Websites (Extended Search)

in a parameter space (field toroidal and poloidal field, plasma density and lh frequency) comparable to future reactors. 2 Background Discuss physics basis of the proposed...

499

Ramblewood Green: Proposed Penalty (2014-CE-23017) | Department...  

Office of Environmental Management (EM)

July 23, 2014 DOE alleged in a Notice of Proposed Civil Penalty that Ramblewood Green Ltd. failed to certify cooking products as compliant with the applicable energy...

500

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Office of Environmental Management (EM)

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...