Powered by Deep Web Technologies
Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Method for gathering and summarizing internet information  

DOE Patents (OSTI)

A computer method of gathering and summarizing large amounts of information comprises collecting information from a plurality of information sources (14, 51) according to respective maps (52) of the information sources (14), converting the collected information from a storage format to XML-language documents (26, 53) and storing the XML-language documents in a storage medium, searching for documents (55) according to a search query (13) having at least one term and identifying the documents (26) found in the search, and displaying the documents as nodes (33) of a tree structure (32) having links (34) and nodes (33) so as to indicate similarity of the documents to each other.

Potok, Thomas E [Oak Ridge, TN; Elmore, Mark Thomas [Oak Ridge, TN; Reed, Joel Wesley [Knoxville, TN; Treadwell, Jim N; Samatova, Nagiza Faridovna [Oak Ridge, TN

2008-01-01T23:59:59.000Z

2

Relating web pages to enable information-gathering tasks  

Science Conference Proceedings (OSTI)

We argue that relationships between Web pages are functions of the user's intent. We identify a class of Web tasks - information-gathering - that can be facilitated by providing links to pages related to the page the user is currently viewing. We define ... Keywords: authorities, hubs, information gathering, network flow, related pages, similarity measures

Amitabha Bagchi; Garima Lahoti

2009-06-01T23:59:59.000Z

3

EIA-23L Reserves Information Gathering System (RIGS)  

Gasoline and Diesel Fuel Update (EIA)

EIA-23L Reserves Information Gathering System (RIGS) EIA-23L Reserves Information Gathering System (RIGS) Released: April 16, 2013 Background The Form EIA-23L, "Annual Survey of Domestic Oil and Gas Reserves, " is used to collect data on reserves of crude oil, natural gas, and natural gas liquids. These data are used to develop national and regional estimates of proved reserves of domestic crude oil, natural gas, and natural gas liquids, and to facilitate national energy policy decisions. Reporting on the Form EIA-23L is mandatory. Reserves Information Gathering System The Form EIA-23L Reserves Information Gathering System (RIGS), provides respondents with an efficient and effective means for filing the form using a personal computer (PC). Hardware / Software Requirements The minimum hardware requirements needed to install and use RIGS are:

4

Networked Information Gathering and Fusion of PMU Data  

E-Print Network (OSTI)

Networked Information Gathering and Fusion of PMU Data Future Grid Initiative White Paper Power Sustainable Energy Systems" Funded by the U.S. Department of Energy White Paper Team Junshan Zhang and Vijay 12-07 March 22, 2012 #12;Information about this white paper For information about this white paper

5

Remote multi-position information gathering system and method  

DOE Patents (OSTI)

A technique for gathering specific information from various remote locations, especially fluorimetric information characteristic of particular materials at the various locations is disclosed herein. This technique uses a single source of light disposed at still a different, central location and an overall optical network including an arrangement of optical fibers cooperating with the light source for directing individual light beams into the different information bearing locations. The incoming light beams result in corresponding displays of light, e.g., fluorescent light, containing the information to be obtained. The optical network cooperates with these light displays at the various locations for directing outgoing light beams containing the same information as their cooperating displays from these locations to the central location. Each of these outgoing beams is applied to a detection arrangement, e.g., a fluorescence spectroscope, for retrieving the information contained thereby. 9 figs.

Hirschfeld, T.B.

1989-01-24T23:59:59.000Z

6

Remote multi-position information gathering system and method  

DOE Patents (OSTI)

A technique for gathering specific information from various remote locations, especially fluorimetric information characteristic of particular materials at the various locations is disclosed herein. This technique uses a single source of light disposed at still a different, central location and an overall optical network including an arrangement of optical fibers cooperating with the light source for directing individual light beams into the different information bearing locations. The incoming light beams result in corresponding displays of light, e.g., fluorescent light, containing the information to be obtained. The optical network cooperates with these light displays at the various locations for directing outgoing light beams containing the same information as their cooperating displays from these locations to the central location. Each of these outgoing beams is applied to a detection arrangement, e.g., a fluorescence spectroscope, for retrieving the information contained thereby.

Hirschfeld, Tomas B. (Livermore, CA)

1989-01-01T23:59:59.000Z

7

Remote multi-position information gathering system and method  

DOE Patents (OSTI)

A technique for gathering specific information from various remote locations, especially fluorimetric information characteristic of particular materials at the various locations is disclosed herein. This technique uses a single source of light disposed at still a different, central location and an overall optical network including an arrangement of optical fibers cooperating with the light source for directing individual light beams into the different information bearing locations. The incoming light beams result in corresponding displays of light, e.g., fluorescent light, containing the information to be obtained. The optical network cooperates with these light displays at the various locations for directing outgoing light beams containing the same information as their cooperating displays from these locations to the central location. Each of these outgoing beams is applied to a detection arrangement, e.g., a fluorescence spectroscope, for retrieving the information contained thereby.

Hirschfeld, Tomas B. (Livermore, CA)

1986-01-01T23:59:59.000Z

8

Remote multi-position information gathering system and method  

DOE Patents (OSTI)

A technique for gathering specific information from various remote locations, especially fluorimetric information characteristic of particular materials at the various locations is disclosed herein. This technique uses a single source of light disposed at still a different, central location and an overall optical network including an arrangement of optical fibers cooperating with the light source for directing individual light beams into the different information bearing locations. The incoming light beams result in corresponding displays of light, e.g., fluorescent light, containing the information to be obtained. The optical network cooperates with these light displays at the various locations for directing ongoing light beams containing the same information as their cooperating displays from these locations to the central location. Each of these outgoing beams is applied to a detection arrangement, e.g., a fluorescence spectroscope, for retrieving the information contained thereby.

Hirschfeld, Tomas B. (Livermore, CA)

1986-01-01T23:59:59.000Z

9

Topic Area 2: Data Gathering and Analysis | Open Energy Information  

Open Energy Info (EERE)

2: Data Gathering and Analysis 2: Data Gathering and Analysis Jump to: navigation, search Geothermal ARRA Funded Projects for Topic Area 2: Data Gathering and Analysis Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":200,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

10

CLASSIFY-Applications: Volume 1: Gathering Information About Your Customers  

Science Conference Proceedings (OSTI)

EPRI's CLASSIFY System helps utilities understand the lifestyle, business, and energy needs of their residential, commercial, and industrial customers. These needs form the foundation of the attitudes and values that drive end-use equipment purchases and energy consumption. Such information is crucial if utilities are to develop and deliver customer-driven products and services. This report is available only to funders of Program 101A or 101.001. Funders may download this report at http://my.primen.com/...

1995-05-11T23:59:59.000Z

11

Agent-Based Software for Gathering and Summarizing Textual and Internet Information  

ORNL’s Piranha solves the challenge most users face: finding a way to sift throughlarge amounts of data that provide accurate and relevant information. This requiressoftware that can quickly filter, relate, and show documents and relationships. ...

12

Data:74b96db2-a9fa-46a9-af93-5e8986655f92 | Open Energy Information  

Open Energy Info (EERE)

db2-a9fa-46a9-af93-5e8986655f92 db2-a9fa-46a9-af93-5e8986655f92 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lea County Electric Coop, Inc Effective date: 2009/08/30 End date if known: Rate name: Primary Service Over 2MW Sector: Industrial Description: Available system-wide, under contract, for petroleum pumping, pipeline pumping, government agencies, industrial uses, and such other service in conjuction therewith and incidental thereto, supplied at one point of delivery, measured by watt-hour meter, where facilities of adequate capacity and suitable potential are adjacent to the premises to be served over 2000k demand.

13

Data:70fea17e-eda4-4a6a-9e81-5e3a9e785422 | Open Energy Information  

Open Energy Info (EERE)

fea17e-eda4-4a6a-9e81-5e3a9e785422 fea17e-eda4-4a6a-9e81-5e3a9e785422 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware Electric Cooperative Effective date: 2011/02/01 End date if known: Rate name: Lighting Service--Schedule L-1 Mercury Vapor Lamp- Area Lighting Luminaire (175w) Sector: Lighting Description: Available to Members, governments, agencies, public and private organizations desiring Electric Delivery or Electric Supply and Delivery Services through unmetered services for roadway and area lighting. Source or reference: http://www.delaware.coop/my-services/residential/billing/rates

14

Data:28ae0957-3fcf-4a9f-a9ff-ca06b2106019 | Open Energy Information  

Open Energy Info (EERE)

ae0957-3fcf-4a9f-a9ff-ca06b2106019 ae0957-3fcf-4a9f-a9ff-ca06b2106019 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Courtland, Alabama (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: MSC Sector: Industrial Description: Source or reference: ISU binder Source Parent: Comments flat rate & fuel cost adjustments change monthly Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1

15

Data:30272227-76f2-4518-9e01-7d60caa5a9a9 | Open Energy Information  

Open Energy Info (EERE)

72227-76f2-4518-9e01-7d60caa5a9a9 72227-76f2-4518-9e01-7d60caa5a9a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: End date if known: Rate name: New Load Standby Generation Rider Sector: Commercial Description: -The intent of the Cooperative is to reduce or eliminate consumer's billed demand charges as outlined in the standard LP1 Generator and LP2 Generator Rate Tariffs when newly constructed electricity consuming facility is first energized. - Available to a newly built or expanded load for which the minimum demand requirement of the LP1 Generator rates may apply.No resale is permitted.

16

Categorical Exclusion Determinations: A9 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A9 A9 Categorical Exclusion Determinations: A9 Existing Regulations A9: Information gathering, analysis, and dissemination Information gathering (including, but not limited to, literature surveys, inventories, site visits, and audits), data analysis (including, but not limited to, computer modeling), document preparation (including, but not limited to, conceptual design, feasibility studies, and analytical energy supply and demand studies), and information dissemination (including, but not limited to, document publication and distribution, and classroom training and informational programs), but not including site characterization or environmental monitoring. (See also B3.1 of appendix B to this subpart.) Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were

17

Data:32435ebe-89ec-4506-a9af-0575162b3925 | Open Energy Information  

Open Energy Info (EERE)

ebe-89ec-4506-a9af-0575162b3925 ebe-89ec-4506-a9af-0575162b3925 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Pardeeville, Wisconsin (Utility Company) Effective date: 2007/10/10 End date if known: Rate name: Gs-1 General Service Single Phase Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0680 per kilowatt-hour.

18

Data:0414441d-d9a9-4a9b-b247-0da7cf72e003 | Open Energy Information  

Open Energy Info (EERE)

41d-d9a9-4a9b-b247-0da7cf72e003 41d-d9a9-4a9b-b247-0da7cf72e003 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Cp-2 Large Power Time of Day Service between 200kW and 1,000kW Demand with Parallel Generation(20kW or less)-Net Energy Billing Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0509 per kilowatt-hour.

19

Data:9c155141-a9cc-4469-ab9e-4a9d62e1d912 | Open Energy Information  

Open Energy Info (EERE)

1-a9cc-4469-ab9e-4a9d62e1d912 1-a9cc-4469-ab9e-4a9d62e1d912 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salt River Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Large Power 3,000 kW and over (3000 kW - 9999 kW) Sector: Industrial Description: Available to all commercial and industrial consumers for lighting and/or heating or/or power, and who are served directly from a distribution substation of 3000 kW capacity or above. Source or reference: www.srelectric.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

20

Data:F620c3a9-a9a2-4e43-b569-ed4ce349a6fb | Open Energy Information  

Open Energy Info (EERE)

c3a9-a9a2-4e43-b569-ed4ce349a6fb c3a9-a9a2-4e43-b569-ed4ce349a6fb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Clintonville, Wisconsin (Utility Company) Effective date: 2006/05/05 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day 8am-8pm with Parallel Generation(20kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0680 per kWh. See schedule PCAC.

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Data:Bb30dde8-a329-49d1-a9ff-9f662a9bab8d | Open Energy Information  

Open Energy Info (EERE)

0dde8-a329-49d1-a9ff-9f662a9bab8d 0dde8-a329-49d1-a9ff-9f662a9bab8d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Dover, Delaware (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Private Outdoor Lighting: Security Lights, Unmetered, 70 watt HPS Sector: Lighting Description: This style is not available after February 28, 1997. "Where service is not associated with a metered service, a Customer Charge of $5.00 for residential lights and $10.00 for commercial lights will be added to cover the associated costs of billing and related consumer costs not reflected in the lighting schedule."

22

Data:1a26d04f-0afc-4b0c-9d15-a9d69a9a4261 | Open Energy Information  

Open Energy Info (EERE)

f-0afc-4b0c-9d15-a9d69a9a4261 f-0afc-4b0c-9d15-a9d69a9a4261 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Norris Public Power District Effective date: 2012/01/20 End date if known: Rate name: SCHEDULE 6 - GENERAL SERVICE Sector: Commercial Description: Available for commercial, industrial, and farm service, for all uses including lighting, heating, and power, within the District's service area, where the customer's peak demand does not exceed an average of 250 kW for the four summer months and does not exceed 400 kW for any single winter month. Source or reference: http://www.norrisppd.com/downloads/Schedule%206%20-%20General%20Service.pdf

23

Data:5a9ba39d-0a20-4565-8d1d-a9ca2aa53655 | Open Energy Information  

Open Energy Info (EERE)

9d-0a20-4565-8d1d-a9ca2aa53655 9d-0a20-4565-8d1d-a9ca2aa53655 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mitchell Electric Member Corp Effective date: 2009/01/01 End date if known: Rate name: SCHEDULE I-14 IRRIGATION SERVICE SINGLE PHASE OVER 30KVA Sector: Commercial Description: AVAILABILITY Available to consumers for single-phase service in all territory served by the Cooperative. Multi-phase service is available only to consumers located on or near the Cooperative's multi-phase lines of adequate capacity. All service is made available subject to the Cooperative's established Service Rules and Regulations.

24

Data:19a9ca48-9216-4ec4-a384-cc1a9f1f56a0 | Open Energy Information  

Open Energy Info (EERE)

8-9216-4ec4-a384-cc1a9f1f56a0 8-9216-4ec4-a384-cc1a9f1f56a0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Cowlitz County Effective date: 2011/11/01 End date if known: Rate name: PRIVATE STREET AND AREA LIGHTING SCHEDULE 10 Sodium Vapor 100 watts Sector: Lighting Description: Applicable to street, roadway, and area lighting for residential and commercial property. SPECIAL CONDITIONS All lighting equipment, including mast arms, brackets, control equipment, transformers, wiring and supports, shall be owned, operated and maintained by the District. For new installations which do not utilize an existing District-owned pole and require the setting of a new pole for the light, the customer shall pay in advance $300 as an Aid-to- Construction. The District will require a Special Contract for service hereunder for a term of not less than sixty (60) consecutive months reflecting monthly payments computed in accordance with this Rate Schedule as it may be amended or superseded.

25

Data:91a9b456-c26d-4d4a-9fa5-366fba1db0f0 | Open Energy Information  

Open Energy Info (EERE)

b456-c26d-4d4a-9fa5-366fba1db0f0 b456-c26d-4d4a-9fa5-366fba1db0f0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Belmont, Wisconsin (Utility Company) Effective date: 2007/03/12 End date if known: Rate name: Ms-1 Street and Security Lighting Service: 400 W HPS(Ornamental) Sector: Lighting Description: This schedule will be applied to municipal street light lighting. The Utility will furnish, install, and maintain street lighting units. Power Cost Adjustment Clause: Charge per all kWh varies monthly Commitment to Community Program Rider: 2.0% of the total electric bill. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=440

26

Data:A661a9de-9487-41c7-a9ef-c7793287f2a1 | Open Energy Information  

Open Energy Info (EERE)

de-9487-41c7-a9ef-c7793287f2a1 de-9487-41c7-a9ef-c7793287f2a1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wake Electric Membership Corp Effective date: 2013/07/01 End date if known: Rate name: Small General Service Three Phase Sector: Commercial Description: AVAILABILITY Available in all territory served by the Cooperative, subject to the established Service Rules and Regulations of the Cooperative. APPLICABILITY This schedule is applicable to all non-residential service where measured kW demand is 50 kW or less, excluding seasonal accounts. When the metered kW demand exceeds 50 kW three consecutive months, the service will be transferred to the LGS rate.

27

Channels and sources used to gather equine-related information by college-age horse owners and enthusiasts  

E-Print Network (OSTI)

This thesis identifies the equine-related topics that are important to Texas college-age horse owners and enthusiasts and the channels/sources they use to get equine-related information. Little research has focused on this group to determine their information needs. Therefore, two focus groups were conducted in 2008 in Texas with college-age horse owners and enthusiasts to conduct a needs assessment. Participants were separated into competitive and recreational groups depending on their level of participation in the industry. They were asked what topics they consider important and what channels/sources they use to gain desired information. Training was the most mentioned topic overall, and the most mentioned by recreational participants. Alternative medical treatments was the most mentioned topic by competitive participants. Competitive participants reported a smaller number of topics as important, indicating that they have specialized information needs. Recreational participants emphasized broader, less specialized topics. Participants showed an interest in relevant and controversial topics affecting the equine industry. Participants also used a combination of channels/sources and competitive and recreational participants often placed importance on different channels/sources. Face-to-face communication was important to both groups. Magazines were important to competitive participants, while the Internet was important to recreational participants. Competitive participants doubted the trustworthiness of sources available through the Internet, but wanted more reliable sources to be made available in the future. Participants preferred to get information from industry specialist sources, such as trainers, veterinarians, other owners and enthusiasts, breed associations, and equine magazines. Participants’ perceptions of trustworthiness were affected by the source’s ability to demonstrate equine-specific knowledge and the source’s reputation and success among equine industry members. The results suggests that the influence of the Internet has altered the traditional models of communication in which source selection determines channel use. In this study, the participants’ Internet channel selection often determined their source use. The results also suggests that communicators wanting to reach this audience should target specific topics to competitive and recreational audiences, use a multi-channel approach, establish trustworthiness, and explore the changing role of the Internet in agricultural communication.

Sullivan, Erin Alene

2008-12-01T23:59:59.000Z

28

Data:0d344380-6271-46b0-80ad-5110a9e22152 | Open Energy Information  

Open Energy Info (EERE)

6271-46b0-80ad-5110a9e22152 6271-46b0-80ad-5110a9e22152 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2012/12/19 End date if known: Rate name: RATE NO. 09 DUSK TO DAWN LIGHTING-High Pressure Sodium 200W Sector: Lighting Description: Applicability: To all customers for the purposes of outdoor lighting other than street and highway lighting service of privately owned property. Electric service is provided from dusk to dawn. ED3 will install, own, operate and maintain the complete lighting installation, including lamp replacements. Monthly Usage: 84.9kWh

29

Data:9938a3ae-39dd-4803-b189-4195441af5a9 | Open Energy Information  

Open Energy Info (EERE)

ae-39dd-4803-b189-4195441af5a9 ae-39dd-4803-b189-4195441af5a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wells Rural Electric Co Effective date: 2011/10/01 End date if known: Rate name: Security Light- 175 W Sector: Lighting Description: The Seller shall determine the Power Cost Adjustment subject to power supplier charges and credits. Source or reference: http://wrec.coop/info/rates_dyn.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

30

Data:6e26167a-473e-444a-9eae-837da90cc582 | Open Energy Information  

Open Energy Info (EERE)

a-473e-444a-9eae-837da90cc582 a-473e-444a-9eae-837da90cc582 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric Coop, Inc Effective date: 2012/03/19 End date if known: Rate name: Residential and General Service Sector: Residential Description: Source or reference: http://www.lincolnelectric.coop/PDF/schedule-aresidential.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

31

Data:0d045157-3944-4f7a-9c12-f4145621a734 | Open Energy Information  

Open Energy Info (EERE)

45157-3944-4f7a-9c12-f4145621a734 45157-3944-4f7a-9c12-f4145621a734 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Navajo Tribal Utility Authority Effective date: 2002/12/05 End date if known: Rate name: 8 module photvoltaic Sector: Residential Description: Source or reference: http://www.ntua.com/utility_rates/pvrates.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

32

Data:89fee917-1129-442e-b28a-9b075660489f | Open Energy Information  

Open Energy Info (EERE)

fee917-1129-442e-b28a-9b075660489f fee917-1129-442e-b28a-9b075660489f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cuming County Public Pwr Dist Effective date: 2011/12/14 End date if known: Rate name: Municipal Commercial Electric Space Heating Rate Sector: Commercial Description: Source or reference: Illinois State University Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

33

Data:75ca5686-e647-4128-815a-9c6ade87f363 | Open Energy Information  

Open Energy Info (EERE)

ca5686-e647-4128-815a-9c6ade87f363 ca5686-e647-4128-815a-9c6ade87f363 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Cowlitz County Effective date: 2011/11/01 End date if known: Rate name: PUBLIC STREET LIGHTING SERVICE SCHEDULE(District Owned and Maintained) 40 - HPS 100 Watt Sector: Lighting Description: APPLICABILITY Applicable to all governmental customers and contiguous state and county installations for street and highway lighting purposes. CHARACTER OF SERVICE From dusk to dawn daily, controlled by a photoelectric control or time switch to be mutually agreeable to the Customer and District.

34

Data:174dc719-f2a9-4071-8863-680ca579bbdd | Open Energy Information  

Open Energy Info (EERE)

f2a9-4071-8863-680ca579bbdd f2a9-4071-8863-680ca579bbdd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mohave Electric Cooperative, Inc Effective date: 2012/09/01 End date if known: Rate name: LS (250 W HPS Cooperative Owned-129 kWh Per Month) Sector: Lighting Description: Source or reference: http://mohaveelectric.coopwebbuilder.com/content/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

35

Data:87978379-5878-473a-9e17-aaf0f3c0890f | Open Energy Information  

Open Energy Info (EERE)

8379-5878-473a-9e17-aaf0f3c0890f 8379-5878-473a-9e17-aaf0f3c0890f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Small Power Service - More than 100kW -Primary Metering Discount Sector: Commercial Description: Application: This rate will be applied to customers for all types of service if their monthly Maximum Measured Demand is in excess of 100 kilowatts (kW) per month for three or more months in a consecutive 12-month period, unless the customer exceeds the application conditions of the large power time-of-day schedule.

36

Data:1d2012db-460c-406a-9dd1-ac121fa0965c | Open Energy Information  

Open Energy Info (EERE)

460c-406a-9dd1-ac121fa0965c 460c-406a-9dd1-ac121fa0965c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Frankfort, Kentucky (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Rate S1- Security Lights- (400W HPS) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

37

Data:D19941bb-19df-451a-9a51-1062bb10001d | Open Energy Information  

Open Energy Info (EERE)

41bb-19df-451a-9a51-1062bb10001d 41bb-19df-451a-9a51-1062bb10001d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Readsboro, Vermont (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: Outdoor Lighting Rate 18- Street and Area Light (200 W Sodium Vapor) Sector: Lighting Description: Street, area and flood lighting, traffic signal and specialty lighting equipment, energy and maintenance service is available within Green Mountain Power Corporation's ("GMP") service territory under this rate for GMP-owned or Customer-owned equipment to any city, village, town, fire district, political subdivision, Customer association or individual Customer in accordance with the specifications hereinafter set forth.

38

Data:849dc367-b370-4537-8217-061cbce9a9e0 | Open Energy Information  

Open Energy Info (EERE)

7-b370-4537-8217-061cbce9a9e0 7-b370-4537-8217-061cbce9a9e0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2011/01/01 End date if known: Rate name: Schedule LC Street Lighting - Customer Owned-250 watt mercury vapor lamp Sector: Lighting Description: Applicability This schedule is applicable to lighting service for the illumination of public streets, alleys, highways and other publicly-dedicated outdoor places and is available to cities, counties, lighting districts or other public bodies where the District supplies electrical energy only, and the customer furnishes, installs, owns, operates and completely maintains lighting units including switching and all other associated equipment. Monthly Usage: 97kWh

39

Data:49435218-72a9-4071-a24c-08d7e198842e | Open Energy Information  

Open Energy Info (EERE)

218-72a9-4071-a24c-08d7e198842e 218-72a9-4071-a24c-08d7e198842e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Omaha Public Power District Effective date: 2012/01/01 End date if known: Rate name: CONSUMER OWNED STREET LIGHTING Metal Halide 200 DISTRICT Sector: Lighting Description: CONSUMER OWNED SYSTEM OPERATED BY DISTRICT Source or reference: http://ww3.oppd.com/rates/OppdRateManual.pdf#nameddest=110 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

40

Data:3e6508be-932f-484a-9dea-6ceab827b3ac | Open Energy Information  

Open Energy Info (EERE)

32f-484a-9dea-6ceab827b3ac 32f-484a-9dea-6ceab827b3ac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lee County Electric Coop, Inc Effective date: 2008/07/01 End date if known: Rate name: Public Street and Highway Lighting Service- Cooperative Owned Shoebox Fixture (1000W MH Galleria) Sector: Lighting Description: Applicable to customers, under the qualification Street Light Districts and governmental agencies for automatically controlled dusk-to-dawn outdoor lighting where existing overhead secondary circuits are located. Source or reference: https://www.lcec.net/pdf/EntireRateTariff.pdf#page=18

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Data:F1987806-d8cc-4721-acfd-a9ab2ed34306 | Open Energy Information  

Open Energy Info (EERE)

F1987806-d8cc-4721-acfd-a9ab2ed34306 F1987806-d8cc-4721-acfd-a9ab2ed34306 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Electric Coop, Inc (Florida) Effective date: End date if known: Rate name: Outdoor Lighting MV 250 W Sector: Lighting Description: Source or reference: http://www.tcec.com/myBusiness/resSinglePhase.aspx Source Parent: http://www.tcec.com/ Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

42

Data:Df1881a9-a802-4447-8451-e1954792b14e | Open Energy Information  

Open Energy Info (EERE)

881a9-a802-4447-8451-e1954792b14e 881a9-a802-4447-8451-e1954792b14e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Leigh, Nebraska (Utility Company) Effective date: 2013/01/15 End date if known: Rate name: Customer Generation Under Standby Concept - Subtransmission Substation Sector: Industrial Description: To any customer whose requirements are taken at a point or points determined by the District under a contract of standard form, where the customer's total monthly demand load exceeds 20,000 kilowatts and the customer takes delivery on the secondary side of a District Substation on the customer's property. (Not applicable to resale, standby or auxiliary service.)

43

Data:0944af53-b9a9-4942-83a7-851991add082 | Open Energy Information  

Open Energy Info (EERE)

b9a9-4942-83a7-851991add082 b9a9-4942-83a7-851991add082 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Miami-Cass County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Residential Single Phase Sector: Residential Description: The Miami-Cass County Rural Electric Membership Corporation (REMC) shall charge and collect for residential electric service on the following bases of availability, application, character of service, monthly rate, minimum charge, purchased power cost adjustment clause, and tax adjustment. AVAILABILITY: This schedule is available to any member of the REMC located within the territory served by Miami-Cass County Rural Electric Membership Corporation.

44

Data:99065aca-515b-4375-b2f6-c1a9dddd46bf | Open Energy Information  

Open Energy Info (EERE)

aca-515b-4375-b2f6-c1a9dddd46bf aca-515b-4375-b2f6-c1a9dddd46bf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Street Lighting 175 W MV Opt. 1 L-1 Sector: Lighting Description: Option 1 refers to a Customer owned and installed fixture. The fixed monthly charge covers energy, operation and fixture maintenance fees. Possible Additional Fees include: Transfer of a street light, mast arm, overhead conductor, and conductor support to a new pole, and make necessary electrical connection: $175 each.

45

Data:6f5823a9-e151-4cdb-bd47-f02284329458 | Open Energy Information  

Open Energy Info (EERE)

a9-e151-4cdb-bd47-f02284329458 a9-e151-4cdb-bd47-f02284329458 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of NM Effective date: 2011/08/21 End date if known: Rate name: 10A Irrigation Sector: Description: The rates on this Schedule are available only for irrigation pumping installations of not less than 5HP and where service is used to irrigate three or more acres of land used principally for agricultural purposes. Source or reference: http://www.pnm.com/regulatory/electricity_legacy.htm?source=col2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

46

Data:233bd1f3-2001-4823-9a9f-026218b35abd | Open Energy Information  

Open Energy Info (EERE)

bd1f3-2001-4823-9a9f-026218b35abd bd1f3-2001-4823-9a9f-026218b35abd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mascoutah, Illinois (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Municipal Street Lighting Service- Rate 6: Mercury Vapor, 7200 Lumen, 175 watts, Class B Sector: Lighting Description: Class B: Mercury Vapor Lamps or Sodium Vapor Lamps on standard overhead wood pole construction, owned and operated by utility. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

47

Data:732931fc-2792-4c74-a9bc-46268f9acabd | Open Energy Information  

Open Energy Info (EERE)

31fc-2792-4c74-a9bc-46268f9acabd 31fc-2792-4c74-a9bc-46268f9acabd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Auburn Board of Public Works Effective date: 2012/01/01 End date if known: Rate name: Rural Electric Space Heating(Single Phase-Summer) Sector: Commercial Description: To customers outside the corporate limits of the city of Auburn, NE as a rider to the General Service or Demand Service where only electric heating, cooling, and electric water heating, and associated equipment are connected as a separate service. Source or reference: http://auburnbpw.com/wp-content/files/2012_Electric_Rates.pdf

48

Data:6cd685a8-b928-4484-a3a9-956728865276 | Open Energy Information  

Open Energy Info (EERE)

85a8-b928-4484-a3a9-956728865276 85a8-b928-4484-a3a9-956728865276 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2010/02/01 End date if known: Rate name: Cp-1 Small Power Service Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

49

Data:41acf078-06a9-4601-8224-39aa1cf39010 | Open Energy Information  

Open Energy Info (EERE)

acf078-06a9-4601-8224-39aa1cf39010 acf078-06a9-4601-8224-39aa1cf39010 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Williams - AZ, Arizona (Utility Company) Effective date: End date if known: Rate name: Street Lighting Service(70W HPS) Sector: Lighting Description: To services for lighting public streets, alleys, throughways, public parks and playgrounds by use of City's facilities. Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

50

Data:Fa619227-efcf-4068-a9d2-5dbb5f730241 | Open Energy Information  

Open Energy Info (EERE)

9227-efcf-4068-a9d2-5dbb5f730241 9227-efcf-4068-a9d2-5dbb5f730241 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Benton County Effective date: 2012/01/01 End date if known: Rate name: Large Industrial Sector: Industrial Description: Applicable: To new Large Industrial loads greather than 3,500 kilowatts demand and less than 10 average annual megawatts energy, served under a power sales contract with the District. Character of Service: 60 hertz alternating current of such phase and voltage as the District may have available. Rate: Large Industrial customers will be served at rates determined under a contract negotiated with the District.

51

Data:1bb6f590-ff11-4020-a9ea-2525ce03296f | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:1bb6f590-ff11-4020-a9ea-2525ce03296f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Richland Electric Coop Effective date: End date if known: Rate name: Small Commercial Service- Demand Sector: Commercial Description: Facility charge of $0.50 per installed kVa is applied to this rate Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

52

Data:C195058d-4ed8-4355-8703-a9a48ac36152 | Open Energy Information  

Open Energy Info (EERE)

d-4ed8-4355-8703-a9a48ac36152 d-4ed8-4355-8703-a9a48ac36152 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Gresham, Wisconsin (Utility Company) Effective date: 2010/07/01 End date if known: Rate name: Gs-1 General Service Three Phase with Parallel Generation(20 kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0627 per kilowatt-hour.

53

Data:37549466-45e9-4eb4-8018-8868c84715a9 | Open Energy Information  

Open Energy Info (EERE)

49466-45e9-4eb4-8018-8868c84715a9 49466-45e9-4eb4-8018-8868c84715a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Roosevelt County Elec Coop Inc Effective date: 2013/02/21 End date if known: Rate name: Renewable Energy Rider 500 kWh block Sector: Description: This rate is purchased in blocks of 500kwh for a total block charge of $10.50 Source or reference: http://www.rcec.coopwebbuilder.com/content/consumer-rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

54

Data:766867a9-3329-4b34-b736-152bf8463dc0 | Open Energy Information  

Open Energy Info (EERE)

a9-3329-4b34-b736-152bf8463dc0 a9-3329-4b34-b736-152bf8463dc0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Marshfield, Wisconsin (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 250 W HPS (utility owned and maintained) Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0515 per kilowatt-hour.

55

Data:2532947f-25ab-4047-b663-84a47a9faaa5 | Open Energy Information  

Open Energy Info (EERE)

25ab-4047-b663-84a47a9faaa5 25ab-4047-b663-84a47a9faaa5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Menasha, Wisconsin (Utility Company) Effective date: 2011/04/06 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: This rate is optional to Cp-1, Small Power Service customers if their consumption exceeds 40,000 kWh and their monthly Maximum Measured Demand is in excess of 50 kilowatts (kW) per month for three or more months in a consecutive 12-month period, unless the customer exceeds the application conditions of the large power time-of-day schedule.

56

Data:Cbf37130-69fb-49a9-912f-55271be96525 | Open Energy Information  

Open Energy Info (EERE)

Cbf37130-69fb-49a9-912f-55271be96525 Cbf37130-69fb-49a9-912f-55271be96525 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 2 of Grant County Effective date: 2013/01/01 End date if known: Rate name: RATE SCHEDULE No. 2 GENERAL SERVICE Single-phase Sector: Commercial Description: To accounts with loads not exceeding 500 kW (as measured by Billing Demand) for general service lighting, heating and power (excepting irrigation service) requirements. Minimum Charge: $4.05 per kW of Billing Demand, applicable to loads of 100 kW and above, but not less than 50 cents per day for single-phase service or 75 cents per day for three-phase service.

57

Data:Deb19afc-2160-46a9-8621-099597e58900 | Open Energy Information  

Open Energy Info (EERE)

9afc-2160-46a9-8621-099597e58900 9afc-2160-46a9-8621-099597e58900 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bristol, Tennessee (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: General Service- A2 (Three Phase) Sector: Commercial Description: If (a) the higher of (i) the customer's current effective contract demand, if any, or (ii) its highest billing demand during the latest 12-month period is greater than 50 kW but not more than 1,000 kW or (b) if the customer's billing demand is less than 50 kW and its energy takings for any month during such period exceed 15,000 kWh

58

Data:72177ba9-a9e3-4926-906c-ec5a24195795 | Open Energy Information  

Open Energy Info (EERE)

72177ba9-a9e3-4926-906c-ec5a24195795 72177ba9-a9e3-4926-906c-ec5a24195795 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Licking Rural Electric Inc Effective date: 2011/04/01 End date if known: Rate name: SMALL GENERAL SERVICE TOU Sector: Commercial Description: Available in territory served by the Cooperative where the AMI system is operational, in accordance with the Cooperative's Service Rules and Regulations. APPLICABILITY Applicable to Small Commercial and General Service consumers requiring 50 kVA or less transformer capacity. The capacity of individual motors served under this schedule shall not exceed ten (10) horsepower, without the consent of the Cooperative. TYPE OF SERVICE Single-phase, 60 hertz, at available secondary voltages.

59

Data:95449335-97a9-4343-a247-9484c5bd746c | Open Energy Information  

Open Energy Info (EERE)

35-97a9-4343-a247-9484c5bd746c 35-97a9-4343-a247-9484c5bd746c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hart Electric Member Corp Effective date: 2006/10/01 End date if known: Rate name: Schedule L-10 Lighting Service 250 Watt High Pressure Sodium Cobra Sector: Lighting Description: AVAILABILITY Available in all territory served by the Corporation in accordance with the Corporation's Service Rules and Regulations. APPLICABILITY Applicable for electric service supplied to provide dusk to dawn lighting of consumer's property by means of photo-electric controlled, ballast operated mercury or sodium vapor or metal halide luminaries, and poles conforming to the Corporation's specifications, and where secondary service is available, subject to the established Service Rules and Regulations of the Corporation.

60

Data:8eb9598c-3257-4655-8a9e-a681ebe80680 | Open Energy Information  

Open Energy Info (EERE)

598c-3257-4655-8a9e-a681ebe80680 598c-3257-4655-8a9e-a681ebe80680 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indiana Michigan Power Co (Indiana) Effective date: 2013/04/01 End date if known: Rate name: OL - 100 watt - MV Sector: Lighting Description: Availability of Service. Available for outdoor lighting to individual customers, including community associations and real estate developers located in areas not covered by municipal streetlighting systems. This tariff is not available for municipal street lighting. The Energy Policy Act of 2005 requires that mercury vapor lamp ballasts shall not be manufactured or imported after January 1, 2008. To the extent that the Company has the necessary materials, the Company will continue to maintain existing mercury vapor lamp installations in accordance with this Tariff.

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

8 Kerr Administration Building (541) 737-4085 www.oregonstate.edu/career One of the best sources for gathering information about what's happening in an occupation or an industry  

E-Print Network (OSTI)

. What do you think of the experience I've had so far in terms of entering this field? 16. From your of the interview. NOTE: Always analyze the information you've gathered. Adjust your job search, resume, and career in this occupation? 11. What special advice would you give a person entering this field? 12. What types of training

Escher, Christine

62

Data:158847a9-e149-4803-8d41-b98678d1c062 | Open Energy Information  

Open Energy Info (EERE)

a9-e149-4803-8d41-b98678d1c062 a9-e149-4803-8d41-b98678d1c062 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Waverly Municipal Elec Utility Effective date: End date if known: Rate name: Commercial and Municipal time of Use Service Sector: Commercial Description: Available to small commercial customers and City departmental operations within the service area for service delivered through one meter at one location for normal lighting, power, and supplemental heating purposes. Service requirements cannot exceed 50 kW on this rate. Whenever monthly consumption exceeds 15,000 kWh, a demand meter will be installed to determine whether the customer should be transferred to the General and Municipal Time of Use rate. The customer will be moved to the General and Municipal Time of Use rate if their demand exceeds 50 kW four or more times in any 12 month period. Service is subject to applicable terms and conditions of Waverly Light and Power's electric service Rules of Operation. The rate is designed for customers who can readily switch a substantial portion of their service from daytime operation to nighttime operation, thereby contributing to a reduction of system peak. The service is available on an optional basis to any customer for a minimum of one year.

63

Data:3914608a-9fcb-4ded-83ab-1acb45fa3a88 | Open Energy Information  

Open Energy Info (EERE)

a-9fcb-4ded-83ab-1acb45fa3a88 a-9fcb-4ded-83ab-1acb45fa3a88 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2009/10/30 End date if known: Rate name: Large General Service* Sector: Commercial Description: *Applicable to to all electric service where the Consumer's service characteristics necessitate multi-phase service or where multi-phase service is provided at the request of the Consumer. DETERMINATION OF BILLING DEMAND The Billing Demand shall be based on the highest 15-minute kW measurement during the current month and the preceding eleven (11) months. For the usage months of June through September, the Billing Demand shall be the greater of: (1) 100% of the measured demand for the current month. (2) 85% of the highest demand occurring in the previous summer usage months (June through September). For the usage months of October through May, the Billing Demand shall be the greater of: (1) 75% of the measured demand for the current month. (2) 85% of the highest demand for the previous summer usage months (June through September). Where there is an indication of a power factor of less than 90% lagging, the Cooperative may at its option, install metering equipment to measure Reactive Demand. The Reactive Demand shall be the highest 30-minute kVAR measured during the month. The Cooperative will bill excess kVAR at the rate of $0.30 per excess kVAR.

64

Data:F4ddc3a9-3b6f-446e-99d0-a9a352c0d3f9 | Open Energy Information  

Open Energy Info (EERE)

ddc3a9-3b6f-446e-99d0-a9a352c0d3f9 ddc3a9-3b6f-446e-99d0-a9a352c0d3f9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 2012/03/02 End date if known: Rate name: Large General Service with Electric Space Heating at Primary Voltage Price Schedule LHN Sector: Industrial Description: APPLICABLE: At the option of the customer, in combination with general electric service required on premises by customer, electric space heating which is permanently installed as the preponderant source of heat; subject to applicable terms and conditions of the Company's Electric Service Policies. Applicable to standby or supplementary service (under written agreement only) in conjunction with applicable Company riders for such service.

65

Data:Eb8ec01d-23a9-4a9b-a74b-fa4cb02074f1 | Open Energy Information  

Open Energy Info (EERE)

Eb8ec01d-23a9-4a9b-a74b-fa4cb02074f1 Eb8ec01d-23a9-4a9b-a74b-fa4cb02074f1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Waynesville, North Carolina (Utility Company) Effective date: 2010/07/01 End date if known: Rate name: Renewable Energy and Efficiency Portfolio Standards- Residential Sector: Residential Description: In 2007, the North Carolina General Assembly passed legislation that requires utility companies to develop an increasing supply of alternative energy resources, with 3% of their total supply coming from renewable by 2013 and 12% by 2021. Utility companies are charging their customers to recover the cost of the renewable energy they produce. In turn the Town is passing along these costs to its customers. These charges are set each December.

66

Data:02030e5b-b3a9-40b7-a9d6-a5ed76e6de80 | Open Energy Information  

Open Energy Info (EERE)

e5b-b3a9-40b7-a9d6-a5ed76e6de80 e5b-b3a9-40b7-a9d6-a5ed76e6de80 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Amicalola Electric Member Corp Effective date: End date if known: Rate name: Security Lights Flood MH 1000 W Sector: Lighting Description: Source or reference: http://www.amicalolaemc.com/securitylights.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

67

Data:3b2a84a9-6b00-43b8-8e50-a9cb8a930831 | Open Energy Information  

Open Energy Info (EERE)

a84a9-6b00-43b8-8e50-a9cb8a930831 a84a9-6b00-43b8-8e50-a9cb8a930831 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Athens Utility Board Effective date: 2011/04/01 End date if known: Rate name: Outdoor Lighting: Metal Halide 400W Box Sector: Lighting Description: Installations charge per light: $50.00 Pole charge per month: $2.00(included in the fixed monthly charge) Source or reference: http://www.aub.org/rate_power_ol.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

68

Data:781da7cc-c7f8-4d0b-a9c6-82a9b3bfaf1e | Open Energy Information  

Open Energy Info (EERE)

cc-c7f8-4d0b-a9c6-82a9b3bfaf1e cc-c7f8-4d0b-a9c6-82a9b3bfaf1e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconto Falls Water & Light Comm Effective date: 2010/10/13 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 7am-7pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0847 per kilowatt-hour.

69

Agent-Based Software for Gathering and Summarizing Textual and ...  

ORNL 2010-G00618/jcn UT-B IDs 200101031, 200401368, 200601759, 200902235, 200902377 Agent-Based Software for Gathering and Summarizing Textual and Internet Information

70

ARM - Data Gathering and Delivery  

NLE Websites -- All DOE Office Websites (Extended Search)

systems. In addition to the instruments, ARM data is also gathered through aircraft, forecast models, satellites, field campaigns, and value-added processing. Aircraft Scientists...

71

Data:8a9b3e79-b1a0-4166-8ee6-1a9b9d38bab7 | Open Energy Information  

Open Energy Info (EERE)

e79-b1a0-4166-8ee6-1a9b9d38bab7 e79-b1a0-4166-8ee6-1a9b9d38bab7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kimballton, Iowa (Utility Company) Effective date: 2012/11/01 End date if known: Rate name: All-Electric Homes Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

72

Data:D7bad42d-1c49-4fbd-909a-9f631bc6cad2 | Open Energy Information  

Open Energy Info (EERE)

bad42d-1c49-4fbd-909a-9f631bc6cad2 bad42d-1c49-4fbd-909a-9f631bc6cad2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: End date if known: Rate name: Electricity Area Lighting Rates (55 FL LPS Private Area Lighting) Sector: Commercial Description: Source or reference: http://publicutilities.columbus.gov/uploadedFiles/Public_Utilities/Document_Library/Residential_Bills_and_Payments/2011_Rates_and_Information/Electricity%20Area%20Lighting%20Rates%202011.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

73

Data:3e993494-ff87-4728-b8a9-e8fb7dedf5d3 | Open Energy Information  

Open Energy Info (EERE)

94-ff87-4728-b8a9-e8fb7dedf5d3 94-ff87-4728-b8a9-e8fb7dedf5d3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp (Tennessee) Effective date: 2013/06/01 End date if known: Rate name: GSA-Part 2 Sector: Commercial Description: Source or reference: http://www.tcemc.org/index.php/business-information/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

74

Data:B41b5a9a-0806-4f4c-abae-d7019a4ad886 | Open Energy Information  

Open Energy Info (EERE)

a9a-0806-4f4c-abae-d7019a4ad886 a9a-0806-4f4c-abae-d7019a4ad886 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kootenai Electric Cooperative Effective date: 2012/04/01 End date if known: Rate name: Smart Pay General Service Sector: Commercial Description: AVAILABILITY: Available to members for uses subject to the established rules and regulations of the Cooperative. The capacity of individual motors served under this schedule shall not exceed 10 H.P. Additional Information: Service Availability Charge: $0.55/ per day and SMART Pay Equipment Charge: $0.45/per day are used to create the Monthly Fixed Charge

75

Data:2588a0d5-6dec-406b-a182-e40a9aebe06a | Open Energy Information  

Open Energy Info (EERE)

-6dec-406b-a182-e40a9aebe06a -6dec-406b-a182-e40a9aebe06a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of LaFayette, Georgia (Utility Company) Effective date: 2013/04/08 End date if known: Rate name: Residential Service Sector: Residential Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Additional%20Information%20Obtained/Attachments/72/City%20of%20LaFayette%20GA%20rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

76

Data:9db2d411-bd2c-432d-9456-bd74299e78a9 | Open Energy Information  

Open Energy Info (EERE)

d411-bd2c-432d-9456-bd74299e78a9 d411-bd2c-432d-9456-bd74299e78a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of LaFayette, Georgia (Utility Company) Effective date: 2013/04/08 End date if known: Rate name: Large General Service Sector: Commercial Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Additional%20Information%20Obtained/Attachments/72/City%20of%20LaFayette%20GA%20rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

77

Data:10c28040-698e-4ba1-8f2d-8e51f7180a9e | Open Energy Information  

Open Energy Info (EERE)

698e-4ba1-8f2d-8e51f7180a9e 698e-4ba1-8f2d-8e51f7180a9e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Snohomish County PUD No 1 Effective date: 2002/04/01 End date if known: Rate name: 150 WATHS STREET LIGHTING SERVICE Sector: Lighting Description: Source or reference: http://www.snopud.com/Site/Content/Documents/rates/streetlighting_rates010105.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

78

Data:Fdaeb9af-0027-4d11-a9b9-5acec97f58ab | Open Energy Information  

Open Energy Info (EERE)

Fdaeb9af-0027-4d11-a9b9-5acec97f58ab Fdaeb9af-0027-4d11-a9b9-5acec97f58ab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Coop Effective date: 2009/01/01 End date if known: Rate name: Rate Schedule SL (Security Lighting) (Standard Fixtures 400 Watt HPS) Sector: Lighting Description: Available to all cooperative members. Standard fixtures 400 watt HPS. Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

79

Data:Fee0631d-1763-440b-9014-ac4cd388a9e2 | Open Energy Information  

Open Energy Info (EERE)

Fee0631d-1763-440b-9014-ac4cd388a9e2 Fee0631d-1763-440b-9014-ac4cd388a9e2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Utility District No 2 Effective date: 2011/10/01 End date if known: Rate name: Small Commercial Single Phase Sector: Commercial Description: This schedule is applicable to SMALL commercial and other services not eligible under other rate schedules where measured demand is less than 50 kW. Commercial accounts are billed on a regular monthly cycle. Power Cost Adjustment Factor = 7% The Power Cost Adjustment is based on rate adjustments from BPA . Minimum Charge Single Phase - $ 21.00 per meter per month

80

Data:43238fa8-a5a7-48d7-aeb2-f7196a7a9c9f | Open Energy Information  

Open Energy Info (EERE)

8fa8-a5a7-48d7-aeb2-f7196a7a9c9f 8fa8-a5a7-48d7-aeb2-f7196a7a9c9f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Danville, Virginia (Utility Company) Effective date: 2012/08/28 End date if known: Rate name: Street Lighting Service- 250W HPS Overhead Wood Sector: Lighting Description: Available for lighting streets and roadways, whether public or private, which are thoroughfares for normal flow of vehicular traffic. This rate is generally available to governmental agencies. Source or reference: http://www.danville-va.gov/DocumentCenter/View/8181 Source Parent: Comments Applicability

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Data:1f06c3a9-fb2c-4234-a83b-c527755c7472 | Open Energy Information  

Open Energy Info (EERE)

c3a9-fb2c-4234-a83b-c527755c7472 c3a9-fb2c-4234-a83b-c527755c7472 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp Effective date: 2012/01/01 End date if known: Rate name: Church Service Electric NonDemand Sector: Description: Three-phase service is available to churches with prior approval of the Cooperative. Members receiving three-phase service will be billed a monthly charge of $12.50 in addition to all other charges. Source or reference: http://www.tri-countyemc.com/skins/userfiles/file/Church%20Elec%20Nondemand%20C-1E%202012.pdf Source Parent: Comments Applicability

82

Data:Aa8e7918-a9eb-444c-b6cd-d19307e54dac | Open Energy Information  

Open Energy Info (EERE)

e7918-a9eb-444c-b6cd-d19307e54dac e7918-a9eb-444c-b6cd-d19307e54dac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Greenwich, Ohio (Utility Company) Effective date: 2010/07/20 End date if known: Rate name: Small Commercial Three-Wire Service- Outside Village Sector: Commercial Description: Source or reference: http://www.amlegal.com/nxt/gateway.dll/Ohio/greenwich_oh/codifiedordinancesofgreenwichohio?f=templates$fn=default.htm$3.0$vid=amlegal:greenwich_oh Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

83

Data:05f826a9-6057-4fba-9fa4-3f998dd1065e | Open Energy Information  

Open Energy Info (EERE)

26a9-6057-4fba-9fa4-3f998dd1065e 26a9-6057-4fba-9fa4-3f998dd1065e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Thomasville, Georgia (Utility Company) Effective date: End date if known: Rate name: Electric Commercial Service Large General Service High Load Factor Sector: Commercial Description: To any general service, commercial or industrial customer of greater than 2500 kilowatts demand Source or reference: Rate Binder #2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

84

Data:B8a1a9c7-880d-4382-bc63-dacf49225b56 | Open Energy Information  

Open Energy Info (EERE)

a1a9c7-880d-4382-bc63-dacf49225b56 a1a9c7-880d-4382-bc63-dacf49225b56 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Indiana Gas & Elec Co Effective date: 2011/05/03 End date if known: Rate name: SL-1 - B - 1000 watt - Overhead Sector: Commercial Description: AVAILABILITY This Rate Schedule shall be available throughout Company's Service Area, subject to the availability of adequate facilities and power supplies, which determinations shall be within Company's reasonable discretion. APPLICABILITY This Rate Schedule shall be applicable for standard street and highway lighting service to any Customer which is a Municipal Corporation.

85

Data:C04d181c-093d-4661-a36f-a670a9fd5c2a | Open Energy Information  

Open Energy Info (EERE)

d181c-093d-4661-a36f-a670a9fd5c2a d181c-093d-4661-a36f-a670a9fd5c2a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Davis Elec Coop, Inc Effective date: 2008/07/01 End date if known: Rate name: Irrigation Service Sector: Residential Description: Available to Members of the Cooperative for irrigation pump service. Source or reference: www.jdec.org Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

86

Data:Ff08ae11-1837-4341-a9bb-3a07a243df58 | Open Energy Information  

Open Energy Info (EERE)

1837-4341-a9bb-3a07a243df58 1837-4341-a9bb-3a07a243df58 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Gulf States Louisiana LLC Effective date: 2011/10/28 End date if known: Rate name: 2 Area Lighting - Flood light MH - 1000W Sector: Lighting Description: This rate is applicable under the regular terms and conditions of the company in areas designated by company where facilities of adequate capacity and suitable voltage are available. Source or reference: http://www.entergy-louisiana.com/content/price/tariffs/egsi/egsila_als.pdf Source Parent: Comments Applicability Demand (kW)

87

Data:F89a233b-f339-4567-8b08-2e4455d776a9 | Open Energy Information  

Open Energy Info (EERE)

b-f339-4567-8b08-2e4455d776a9 b-f339-4567-8b08-2e4455d776a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jones-Onslow Elec Member Corp Effective date: 2009/01/01 End date if known: Rate name: Small General Service Single Phase Sector: Commercial Description: unable to c/p. Source or reference: Direct contact Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

88

Data:C782dbaf-0f94-440b-8bbd-eba1798025a9 | Open Energy Information  

Open Energy Info (EERE)

dbaf-0f94-440b-8bbd-eba1798025a9 dbaf-0f94-440b-8bbd-eba1798025a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Corn Belt Energy Corporation Effective date: End date if known: Rate name: RATE 6 INTERRUPTIBLE SERVICE OVER 50 KW DEMAND Sector: Commercial Description: Applicable to commercial and industrial consumers for all uses including lighting, heating and power, subject to the established rules and regulations of the cooperative. Approval of the cooperative must be obtained prior to installation of any motor requiring starting current in excess of 260 amperes. Source or reference: http://www.cornbeltenergy.com/images/pdfs/700-06%20central%20rate%206%20effective%2004-07.pdf

89

Data:Bf6de621-3bb0-47e3-bd41-1a9bf5dfe53a | Open Energy Information  

Open Energy Info (EERE)

21-3bb0-47e3-bd41-1a9bf5dfe53a 21-3bb0-47e3-bd41-1a9bf5dfe53a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lompoc, California (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Customer Owned Street and Highway Lighting- (70W HPS) Sector: Lighting Description: This schedule applies to Customer-owned and maintained lighting installations which illuminate private streets and highways. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

90

Data:12cff366-0022-4784-a9d9-16b7a430add2 | Open Energy Information  

Open Energy Info (EERE)

cff366-0022-4784-a9d9-16b7a430add2 cff366-0022-4784-a9d9-16b7a430add2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York Power Authority Effective date: 2013/07/01 End date if known: Rate name: SC 91 TOD Sector: Industrial Description: New York City Customers Source or reference: http://www.nypa.gov/about/documents.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

91

Data:C2f79bb9-170f-408f-bf2b-d38595bd85a9 | Open Energy Information  

Open Energy Info (EERE)

f79bb9-170f-408f-bf2b-d38595bd85a9 f79bb9-170f-408f-bf2b-d38595bd85a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Dublin Municipal Electric Util Effective date: 2006/08/15 End date if known: Rate name: Residential: Space Heating and/or Air Conditioning Service Sector: Residential Description: Rate is subject to the following adjustments: Wholesale Power Cost Adjustment and Fuel Cost Adjustment. Minimum monthly charge, per meter: $34.79 The Tiered Rates entered here are the same as the Residential rate for Dublin Municipal Electric Util. The Space Heating and/or Air Conditioning Service rate includes the following provision:

92

Data:D4d5fd4e-db96-42a9-ba54-beaf08834d7a | Open Energy Information  

Open Energy Info (EERE)

d5fd4e-db96-42a9-ba54-beaf08834d7a d5fd4e-db96-42a9-ba54-beaf08834d7a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lexington, Tennessee (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Coincident Peak Rate -98-1A Sector: Commercial Description: City reserves the right, when in its opinion the installation would not be detrimental to the service of the City, to permit other types of motors. Source or reference: http://www.lexingtonnc.net/modules/showdocument.aspx?documentid=412 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

93

Data:76fa874f-a9aa-49f4-aadf-ad719fe44050 | Open Energy Information  

Open Energy Info (EERE)

74f-a9aa-49f4-aadf-ad719fe44050 74f-a9aa-49f4-aadf-ad719fe44050 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kings Mountain, North Carolina (Utility Company) Effective date: 2011/07/31 End date if known: Rate name: Outdoor Lighting Service- 400W Mercury Vapor- Urban, New Pole Sector: Lighting Description: Available to individual customer at locations on the City's distribution system. Source or reference: http://www.cityofkm.com/Downloads/billing/Electric_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

94

Data:13248818-b5e8-40ce-a9f0-644a4f8f12f0 | Open Energy Information  

Open Energy Info (EERE)

b5e8-40ce-a9f0-644a4f8f12f0 b5e8-40ce-a9f0-644a4f8f12f0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Colquitt Electric Membership Corp Effective date: 1993/06/01 End date if known: Rate name: 100W HPS-Open, UNDERGROUND WIRING, Fiberglass Pole (kWh - 5, Consumers Per Light - 8) Sector: Lighting Description: Applicable to street and highway lighting owned by federal, state, or local governments or agencies thereof and to street lighting in residential subdivisions, apartment or condominium complexes, and mobile home parks by ballast operated vapor light fixtures and poles conforming to the Cooperative's specifications.

95

Data:Ba55c3a9-8ed5-4594-a329-ef4d35197f2f | Open Energy Information  

Open Energy Info (EERE)

Ba55c3a9-8ed5-4594-a329-ef4d35197f2f Ba55c3a9-8ed5-4594-a329-ef4d35197f2f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Tarboro, North Carolina (Utility Company) Effective date: 2009/03/28 End date if known: Rate name: Residential- Time of Use Sector: Residential Description: This rate schedule is available to customers purchasing alternating current electricity through one meter for single-family residential use, but limited to no more than 50 customers. Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/213/Tarboro%20NC.pdf

96

Data:6af307a9-ffe0-4158-8b87-8be392c2fe7d | Open Energy Information  

Open Energy Info (EERE)

af307a9-ffe0-4158-8b87-8be392c2fe7d af307a9-ffe0-4158-8b87-8be392c2fe7d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 2012/03/02 End date if known: Rate name: Large General Service, Base Use at Primary Voltage Price Schedules LPN and APN Sector: Industrial Description: APPLICABLE: At the option of the customer, to all electric service required on premises by customer, subject to applicable terms and conditions of the Company's Electric Service Policies and Electric Rate Application. Applicable to standby or supplementary service (under written agreement only) in conjunction with applicable Company riders for such service.

97

Data:5653fdd9-089f-46a9-a460-e32f67de46ac | Open Energy Information  

Open Energy Info (EERE)

3fdd9-089f-46a9-a460-e32f67de46ac 3fdd9-089f-46a9-a460-e32f67de46ac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Walton Electric Member Corp Effective date: 2006/06/01 End date if known: Rate name: Consumer Provide Relamping (Traffic Flasher) Sector: Lighting Description: Each Additional Increment of 60 Watts of Demand: $0.90. Source or reference: http://www.waltonemc.com/commercial/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

98

Data:88bd61a9-ca08-4857-a317-4fd15ee929a6 | Open Energy Information  

Open Energy Info (EERE)

a9-ca08-4857-a317-4fd15ee929a6 a9-ca08-4857-a317-4fd15ee929a6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No2 Pinal Cnty Effective date: 2012/07/11 End date if known: Rate name: Lighting Rate Schedule No. 8-Owned By District-Aluminum Breakaway Pole - 38 Ft. ADOT Spec-250 Watt Sector: Lighting Description: Applicability: Applicable to any type of photocell operated fixtures, either individual or multiple, operated from dusk to dawn. Source or reference: http://www.ed2.com/Docs/Rates/Security%20and%20Street%20Lighting%20Schedule%20No.%208.pdf Source Parent: Comments Applicability

99

Data:Cd987a9e-9264-4a6e-b448-fffecea0894d | Open Energy Information  

Open Energy Info (EERE)

87a9e-9264-4a6e-b448-fffecea0894d 87a9e-9264-4a6e-b448-fffecea0894d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Holy Cross Electric Assn, Inc Effective date: 2011/07/01 End date if known: Rate name: General Services - Large Sector: Commercial Description: Available to General Service consumers (Rate Codes 62, 63, 64) and Irrigation Service (Rate Code 41), whose capacity used is 50 kW or greater. This tariff is optional to consumers whose annual Maximum Demand used is less than 50 kW subject to the established tariffs, rules and regulations of Holy Cross. Fixed monthly charge: PCA = [(C+T+A)/S] - B

100

Data:B7cbe984-2cf9-4fcc-850a-9d83cfbae672 | Open Energy Information  

Open Energy Info (EERE)

cbe984-2cf9-4fcc-850a-9d83cfbae672 cbe984-2cf9-4fcc-850a-9d83cfbae672 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sandersville, Georgia (Utility Company) Effective date: 2008/06/01 End date if known: Rate name: Residential Sector: Residential Description: Applicable to all domestic uses of the customer in a separately metered single-family or apartment dwelling unit. Source or reference: Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Data:Aa5ef311-4e56-4653-83e5-d3a2114d8a9f | Open Energy Information  

Open Energy Info (EERE)

ef311-4e56-4653-83e5-d3a2114d8a9f ef311-4e56-4653-83e5-d3a2114d8a9f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Security Lighting MV 175 W w/ Pole Sector: Lighting Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. Source or reference: http://www.singingriver.com/Files/R-18.pdf Source Parent: Comments Energy Adjustment is Power Cost Adjustment plus Environmental Clause plus Regulatory Adjustment Applicability Demand (kW) Minimum (kW):

102

Data:Da62a5cc-26a9-4f79-ae72-1f3fda749409 | Open Energy Information  

Open Energy Info (EERE)

cc-26a9-4f79-ae72-1f3fda749409 cc-26a9-4f79-ae72-1f3fda749409 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Georgetown, Texas (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Retail Street Lighting Service, 250 watts Sector: Lighting Description: 250 watts lamp(86 kWh) Source or reference: http://billing.georgetown.org/rates/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

103

Data:3076cde7-7cd8-4c1b-b75c-79fc69bda4a9 | Open Energy Information  

Open Energy Info (EERE)

7cd8-4c1b-b75c-79fc69bda4a9 7cd8-4c1b-b75c-79fc69bda4a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Power, Inc Effective date: 2011/10/01 End date if known: Rate name: 100 W HPS Sector: Lighting Description: * Applicable to customers who receive dusk to dawn area lighting service. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

104

Data:E6ef5af2-eba1-4f6a-9ba2-3492960faa16 | Open Energy Information  

Open Energy Info (EERE)

ef5af2-eba1-4f6a-9ba2-3492960faa16 ef5af2-eba1-4f6a-9ba2-3492960faa16 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gastonia, North Carolina (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: SCHEDULE CS - Small Commercial Service Sector: Commercial Description: Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

105

Data:A79c5a9d-73ab-423b-83be-52b6b3fd685d | Open Energy Information  

Open Energy Info (EERE)

c5a9d-73ab-423b-83be-52b6b3fd685d c5a9d-73ab-423b-83be-52b6b3fd685d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Monroe County Elec Coop, Inc Effective date: 2013/04/01 End date if known: Rate name: Security Lights(50 W Sodium Flood Light) Sector: Commercial Description: Unmetered automatic Mercury Vapor Lighting and High Pressure Lighting, shall be available to consumers of the cooperative at the following rates and conditions. Source or reference: http://www.mcec.org/Documents/2013%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

106

Data:51d84d13-48a9-4b51-b790-fb54c59bee0c | Open Energy Information  

Open Energy Info (EERE)

d84d13-48a9-4b51-b790-fb54c59bee0c d84d13-48a9-4b51-b790-fb54c59bee0c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Broad River Electric Coop, Inc Effective date: 2012/07/01 End date if known: Rate name: Rate Code 30, Residential Service Three-Phase Sector: Residential Description: * Available to only residences,condominiums,mobile homes or individually metered apartment in which the energy required for all water heating,cooking and environmental space conditioning is supplied electrically. Subject to taxes and wholesale power cost adjustment. Source or reference: Rate binder # 4(Illinios State University)

107

Data:1e9fe898-a250-4c5f-a9a8-2ee026307e34 | Open Energy Information  

Open Energy Info (EERE)

fe898-a250-4c5f-a9a8-2ee026307e34 fe898-a250-4c5f-a9a8-2ee026307e34 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tell City, Indiana (Utility Company) Effective date: 2009/09/01 End date if known: Rate name: Street Lighting: Metal Halide, 250 Watt, Type 1 Sector: Lighting Description: The Fixed monthly charge entered here is the sum of the "Facilities" charge ($9.79) and the "Usage" charge ($3.43). Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

108

Data:D69d2911-84a9-4152-8738-fb49de2ea1b1 | Open Energy Information  

Open Energy Info (EERE)

911-84a9-4152-8738-fb49de2ea1b1 911-84a9-4152-8738-fb49de2ea1b1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Paris, Tennessee (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: General Power- GSA3 Sector: Commercial Description: If the higher of the customer's currently effective contract demand or its highest billing demand during the latest 12 month period is greater than 1000 kW. Source or reference: ISU Documentation Rate Binder Ted #11 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

109

Data:E1023b57-93e5-4a9c-864a-bc28cbe9e844 | Open Energy Information  

Open Energy Info (EERE)

E1023b57-93e5-4a9c-864a-bc28cbe9e844 E1023b57-93e5-4a9c-864a-bc28cbe9e844 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sulphur Springs Valley E C Inc Effective date: 2013/03/18 End date if known: Rate name: Street Lighting: 70 Watt HPS Sector: Lighting Description: *Available for lighting public streets,alleys, thoroughfares, public parks and playgrounds by use of Cooperative's standard facilities. Cooperative Provided Facilities and Cooperative Operated. Source or reference: http://www.ssvec.org/wp-content/uploads/downloads/2013/03/SSVEC-Rates-03.18.13.pdf Source Parent: Comments Applicability

110

Data:3c799715-c6d4-483a-9c22-7b3da6aac5f0 | Open Energy Information  

Open Energy Info (EERE)

-c6d4-483a-9c22-7b3da6aac5f0 -c6d4-483a-9c22-7b3da6aac5f0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power (Maryland) Effective date: 2012/06/01 End date if known: Rate name: GENERAL SERVICE - TRANSMISSION "GS-T" Sector: Commercial Description: Source or reference: http://www.delmarva.com/_res/documents/DPLMdMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

111

Data:D25c4d86-6a9d-437b-aab2-898896f4ed3a | Open Energy Information  

Open Energy Info (EERE)

d86-6a9d-437b-aab2-898896f4ed3a d86-6a9d-437b-aab2-898896f4ed3a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Florida Elec Coop, Inc Effective date: 2011/11/01 End date if known: Rate name: Rate Schedule GSD- General Service Demand Sector: Commercial Description: Applicable to members of the Cooperative for non-residential purposes where the estimated or demonstrated demand is greater than or equal to 50 kW for at least 3 consecutive months. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

112

Data:5deae483-2d09-4dba-a2a9-aec39f1eaaf5 | Open Energy Information  

Open Energy Info (EERE)

deae483-2d09-4dba-a2a9-aec39f1eaaf5 deae483-2d09-4dba-a2a9-aec39f1eaaf5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of West Point, Mississippi (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: Seasonal Demand and Energy Manufacturing- SMSC Sector: Industrial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

113

Data:A45004c6-6aa4-44e7-85a9-746706971ed4 | Open Energy Information  

Open Energy Info (EERE)

004c6-6aa4-44e7-85a9-746706971ed4 004c6-6aa4-44e7-85a9-746706971ed4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lexington, North Carolina (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Residential Sector: Residential Description: Available only to residential customers in residences, condominiums, mobile homes or individually metered apartments that provide independent and permanent facilities complete for living, sleeping, eating, cooking and sanitation. Source or reference: http://www.lexingtonnc.net/publicutilities/downloads/Current%20Electric%20Rates.pdf

114

Data:D5b141ec-ce49-437a-9a01-1888aca9f3c5 | Open Energy Information  

Open Energy Info (EERE)

1ec-ce49-437a-9a01-1888aca9f3c5 1ec-ce49-437a-9a01-1888aca9f3c5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: Large Power Service Sector: Industrial Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

115

Data:B1cd71e1-6fca-493a-9e7d-63708d69e336 | Open Energy Information  

Open Energy Info (EERE)

cd71e1-6fca-493a-9e7d-63708d69e336 cd71e1-6fca-493a-9e7d-63708d69e336 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Reading, Massachusetts (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Residential Time-of-Use Controlled Water Heater Sector: Residential Description: Additional Info: Applicable to: Individual residential customers for all domestic uses where service is taken through one On-Peak and Off-Peak meter. Incidental commercial use, not exceeding 20% of the total energy used on the same premises is permitted. The following charges/adjustments apply:

116

Data:B26bcdd0-4466-4565-a55a-15e89cf512a9 | Open Energy Information  

Open Energy Info (EERE)

bcdd0-4466-4565-a55a-15e89cf512a9 bcdd0-4466-4565-a55a-15e89cf512a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Midwest Energy Inc Effective date: 2012/06/29 End date if known: Rate name: LAL- HPS 70 Watt 29 kWh (Existing Pole)- Unmetered Sector: Description: Source or reference: http://www.mwenergy.com/elecrate.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

117

Data:Ca1f8b23-8b7e-4a41-947d-ddecb8091a9e | Open Energy Information  

Open Energy Info (EERE)

3-8b7e-4a41-947d-ddecb8091a9e 3-8b7e-4a41-947d-ddecb8091a9e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wyandotte Municipal Serv Comm Effective date: 2011/10/01 End date if known: Rate name: WASTEWATER PUMPING RATE Sector: Residential Description: Government agencies desiring service at a Primary voltage, for pumping and processing, at a wastewater disposal facility. Customers who apply for this rate must contract for a specified capacity of not less than 3,000 kW at a single location. The customer is required to furnish, own, install and maintain his own transformation facilities acceptable to Wyandotte Municipal Services.

118

Data:5904d6a9-48d1-4560-8c87-0516aba85a10 | Open Energy Information  

Open Energy Info (EERE)

a9-48d1-4560-8c87-0516aba85a10 a9-48d1-4560-8c87-0516aba85a10 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cooperative L&P Assn Lake Cnty Effective date: 2012/01/01 End date if known: Rate name: Wellspring Wind Power Sector: Residential Description: Source or reference: http://www.clpower.com/?p=14 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

119

Data:66b2a06f-b47b-4e1a-9efb-fdeb16db078c | Open Energy Information  

Open Energy Info (EERE)

b47b-4e1a-9efb-fdeb16db078c b47b-4e1a-9efb-fdeb16db078c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Kutztown, Pennsylvania (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: NON INSTITIONAL SERVICE RATE 180000 NON ELECTRIC Sector: Commercial Description: Source or reference: http://www.kutztownboro.org/kutztown/uploads/ElectricRatesJanuary2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

120

Data:5fe98da7-a9e8-4284-9a17-f044af510047 | Open Energy Information  

Open Energy Info (EERE)

8da7-a9e8-4284-9a17-f044af510047 8da7-a9e8-4284-9a17-f044af510047 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mt Wheeler Power, Inc Effective date: 2012/01/10 End date if known: Rate name: OLS - New Poles 200 W HPS Sector: Lighting Description: Source or reference: http://www.mwpower.net/content/member-services-rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Data:032ad883-38ae-41d3-a9e5-47426238f09b | Open Energy Information  

Open Energy Info (EERE)

ad883-38ae-41d3-a9e5-47426238f09b ad883-38ae-41d3-a9e5-47426238f09b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: M J M Electric Cooperative Inc Effective date: End date if known: Rate name: Large Power (100 KVA & Up 3 Phase) Sector: Commercial Description: Large Power (100 KVA & Up 3 Phase) Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

122

Data:2c12815f-11a9-485b-a65b-06bac5698eb3 | Open Energy Information  

Open Energy Info (EERE)

5f-11a9-485b-a65b-06bac5698eb3 5f-11a9-485b-a65b-06bac5698eb3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northwestern Rural E C A, Inc Effective date: 2013/01/01 End date if known: Rate name: Private Outdoor Lighting Service 400 Watts Mercury Vapor Unmetered Sector: Lighting Description: Source or reference: http://www.northwesternrec.com/myHome/billingAndPayments/rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

123

Data:E026aeca-63d7-4df5-90c5-a9ac285f00cc | Open Energy Information  

Open Energy Info (EERE)

aeca-63d7-4df5-90c5-a9ac285f00cc aeca-63d7-4df5-90c5-a9ac285f00cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Lyndonville, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Street Lighting (55 W LED HE without Pole) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

124

Data:9a256c17-dc74-46a9-a6ec-e5839bffd390 | Open Energy Information  

Open Energy Info (EERE)

7-dc74-46a9-a6ec-e5839bffd390 7-dc74-46a9-a6ec-e5839bffd390 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: OL "HPS" 70 Watt (Enclosed) (Customer Owned/w maintenance) 36 kW Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

125

Data:400fb486-ed63-4448-8da2-f9bac3e366a9 | Open Energy Information  

Open Energy Info (EERE)

fb486-ed63-4448-8da2-f9bac3e366a9 fb486-ed63-4448-8da2-f9bac3e366a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: The Potomac Edison Co (West Virginia) Effective date: 2012/04/02 End date if known: Rate name: R (Residential) Sector: Residential Description: AVAILABLE for single phase residential use through one meter. This schedule is not available to Customers in the territory formerly served by Shenandoah Valley Electric Cooperative. Source or reference: https://www.firstenergycorp.com/content/dam/customer/Customer%20Choice/Files/west-virginia/tariffs/WVPERetailTariff.pdf Source Parent:

126

Data:E6122ae3-2aa3-426a-9a29-22084b9a3584 | Open Energy Information  

Open Energy Info (EERE)

122ae3-2aa3-426a-9a29-22084b9a3584 122ae3-2aa3-426a-9a29-22084b9a3584 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Slinger Utilities Effective date: 2007/01/05 End date if known: Rate name: Overhead Street Lighting- 175W MV Sector: Lighting Description: This schedule will be applied to municipal street lighting and private yard lighting. The utility will furnish, install, and maintain street lighting units. This rate is subject to a Power Cost Adjustment charge per all kWh, that varies on a monthly basis. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=5510

127

Data:C53944e6-fe48-487c-a718-99cc216831a9 | Open Energy Information  

Open Energy Info (EERE)

3944e6-fe48-487c-a718-99cc216831a9 3944e6-fe48-487c-a718-99cc216831a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Atlantic City Electric Co Effective date: 2013/02/01 End date if known: Rate name: SPL Experimental Light Emitting Diode Colonial Post Top 100 W Sector: Lighting Description: The following rates shall be applied to the kWh Usage for the particular light type and size to determine the monthly charge per light. Source or reference: http://www.atlanticcityelectric.com/_res/documents/NJTariffSectionIV.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

128

Data:F3384211-06f2-4126-8d96-775a9ed1a8ee | Open Energy Information  

Open Energy Info (EERE)

11-06f2-4126-8d96-775a9ed1a8ee 11-06f2-4126-8d96-775a9ed1a8ee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elizabethton, Tennessee (Utility Company) Effective date: 2013/06/01 End date if known: Rate name: Drainage Pumping Sector: Commercial Description: Source or reference: ISU Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

129

Data:A7cf0897-ffc6-4a2a-9acf-5fca20ca705d | Open Energy Information  

Open Energy Info (EERE)

cf0897-ffc6-4a2a-9acf-5fca20ca705d cf0897-ffc6-4a2a-9acf-5fca20ca705d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbus Southern Power Co Effective date: 2012/03/09 End date if known: Rate name: Residential Energy Storage(Conservation and Load Management Energy Credit) Sector: Residential Description: For the combination of an approved electric thermal storage space heating and/or cooling system and water heater, all of which are designed to consume electrical energy only during the off-peak period as previously described in this schedule, each residence will be credited the Conservation and Load

130

Data:C9587e14-d83d-4b42-a9c5-d81ba8ea0d84 | Open Energy Information  

Open Energy Info (EERE)

4-d83d-4b42-a9c5-d81ba8ea0d84 4-d83d-4b42-a9c5-d81ba8ea0d84 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sleepy Eye Public Utility Comm Effective date: 2012/03/14 End date if known: Rate name: Street Lighting Sector: Lighting Description: Source or reference: ISU Documentation Rate Binder Ted 6 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

131

Data:67570cf1-109b-45b6-a9ce-ff171cd307dc | Open Energy Information  

Open Energy Info (EERE)

cf1-109b-45b6-a9ce-ff171cd307dc cf1-109b-45b6-a9ce-ff171cd307dc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Shelby, Ohio (Utility Company) Effective date: End date if known: Rate name: Security Light- 1000W Metal Halide Sector: Lighting Description: Source or reference: http://www.amlegal.com/nxt/gateway.dll/Ohio/shelby_oh/parttenstreetsutilitiesandpublicservices/titlefour-utilities/chapter1050electricity?f=templates$fn=default.htm$3.0$vid=amlegal:shelby_oh$anc=JD_1050.02 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

132

Data:1a749ce8-22a9-4dfc-b7e6-3137e5228eee | Open Energy Information  

Open Energy Info (EERE)

9ce8-22a9-4dfc-b7e6-3137e5228eee 9ce8-22a9-4dfc-b7e6-3137e5228eee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Membership Corporation Effective date: 2009/07/01 End date if known: Rate name: SUBDIVISION STREET LIGHTING Sodium Vapor, Town & Country- 3 consumers Sector: Lighting Description: 9,500 Lumens 100 W, 1 light per 3 consumers. Availability - Available to individual consumers, in all territory served by the Cooperative, for purposes of residential subdivision street lighting from dusk to dawn. Service under this schedule is subject to the Cooperative's established Service Rules and Regulations

133

Data:68e73637-cd28-4a9c-9a21-63a07f0c4666 | Open Energy Information  

Open Energy Info (EERE)

7-cd28-4a9c-9a21-63a07f0c4666 7-cd28-4a9c-9a21-63a07f0c4666 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Electric Member Corp Effective date: 2010/11/01 End date if known: Rate name: STREET LIGHTING SERVICE ( 150W HPS - Traditional ) Sector: Lighting Description: Additional fees for poles and transformers may apply Source or reference: ISU Documentation Source Parent: Comments Applicable only to outdoor lighting by ballast operated vapor lamp fixtures, either high pressure sodium (HPS) or metal halide (MH), and poles conforming to Cooperative specifications. Applicability

134

Data:030830a1-8a5f-4741-a9b9-9cae3f030acb | Open Energy Information  

Open Energy Info (EERE)

a1-8a5f-4741-a9b9-9cae3f030acb a1-8a5f-4741-a9b9-9cae3f030acb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Carolina Pub Serv Auth Effective date: 2012/12/01 End date if known: Rate name: TP-12 - Temporary Service Sector: Residential Description: This Schedule is available in the retail service area of the Authority in Berkeley, Georgetown, and Horry Counties, South Carolina. This Schedule is not available for breakdown, standby, or supplementary service and shall not be used in parallel with other sources of electric power. Source or reference: https://www.santeecooper.com/pdfs/residential/rates/temporary-service-schedule-tp-12.pdf

135

Data:0d42b7af-6fa9-47a9-a039-40d1f3129151 | Open Energy Information  

Open Energy Info (EERE)

2b7af-6fa9-47a9-a039-40d1f3129151 2b7af-6fa9-47a9-a039-40d1f3129151 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bandon, Oregon (Utility Company) Effective date: End date if known: Rate name: Residential- Outside City Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

136

Data:8c9be902-3a9b-40ac-83d4-cec8f4fbcce9 | Open Energy Information  

Open Energy Info (EERE)

2-3a9b-40ac-83d4-cec8f4fbcce9 2-3a9b-40ac-83d4-cec8f4fbcce9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Union City, Tennessee (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Outdoor Lighting Sector: Lighting Description: Source or reference: http://www.uces.org/rates.asp Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

137

Data:8b859a03-7059-4e4a-9d52-a6d5f4316869 | Open Energy Information  

Open Energy Info (EERE)

7059-4e4a-9d52-a6d5f4316869 7059-4e4a-9d52-a6d5f4316869 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- (100W SV on existing DPUA utility Pole) Sector: Lighting Description: This rate schedule is available on an annual basis to any customer for illumination of outdoor areas. Source or reference: ISU Documentation Rate Binder Ted #9 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

138

Data:76adf4d4-d60a-45a9-976c-3d34efe9eecc | Open Energy Information  

Open Energy Info (EERE)

76adf4d4-d60a-45a9-976c-3d34efe9eecc 76adf4d4-d60a-45a9-976c-3d34efe9eecc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sand Mountain Electric Coop Effective date: 2013/05/01 End date if known: Rate name: Schedule MSB - Manufacturing Service Sector: Industrial Description: Demand Charge: $9.35/kW over contract demand. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

139

Data:Fe92ef55-86a9-497c-aebd-4095920584b1 | Open Energy Information  

Open Energy Info (EERE)

ef55-86a9-497c-aebd-4095920584b1 ef55-86a9-497c-aebd-4095920584b1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lexington, North Carolina (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Very Large Industrial Service Sector: Industrial Description: Available only to establishments classified as "Manufacturing Industries" by the Standard Industrial Classification Manual, 1957 or later version, published by the Bureau of Budget, United States Government, and where more than 50% of the electric consumption of such establishment is used for its manufacturing processes whose monthly demand is 1,000 kW or greater in any three months of the preceding twelve months.

140

Data:9d85149e-157f-4bdf-83a9-309d229cc9e5 | Open Energy Information  

Open Energy Info (EERE)

157f-4bdf-83a9-309d229cc9e5 157f-4bdf-83a9-309d229cc9e5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eugene, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: G-3 (Large General Service Secondary) Sector: Commercial Description: To electric service for large commercial, industrial and public agency customers with monthly billing demands from 501 to 5,000 kilowatts. Service is applicable to customers with the average of the three highest monthly kW demands in a 12-month period falling between 501 and 5,000 kilowatts. Source or reference: http://www.eweb.org/public/documents/policies/electric5.pdf

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Data:8a05a59a-9c7e-46b5-87c4-42c1f62242cc | Open Energy Information  

Open Energy Info (EERE)

a59a-9c7e-46b5-87c4-42c1f62242cc a59a-9c7e-46b5-87c4-42c1f62242cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Leavenworth-Jefferson E C, Inc Effective date: 2010/05/01 End date if known: Rate name: Street Light Rate (MV 250 W) Sector: Lighting Description: Available for municipal outdoor lighting service on public thoroughfares, city housing development, and in public parks where service can be supplied from a breaker box installed by the cooperative on existing facilities of the cooperative. Street Light Rate (MV 250 W) Source or reference: Rate Binder #7 (Illinois State University)

142

Data:Fc28f63f-a9b6-4511-80a7-230126bedfda | Open Energy Information  

Open Energy Info (EERE)

f63f-a9b6-4511-80a7-230126bedfda f63f-a9b6-4511-80a7-230126bedfda No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cotton Electric Coop, Inc Effective date: 2010/02/01 End date if known: Rate name: Interruptible Irrigation Sector: Industrial Description: * Available to members for pump irrigation service Service is metered with Time-of Day Subject to power cost adjustment and tax adjustment Source or reference: ISU Documentation Rate Binder Kelly # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

143

Data:836e7240-8724-4fc7-8925-9dd9d3e233a9 | Open Energy Information  

Open Energy Info (EERE)

40-8724-4fc7-8925-9dd9d3e233a9 40-8724-4fc7-8925-9dd9d3e233a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Williams - AZ, Arizona (Utility Company) Effective date: End date if known: Rate name: City owned Lights(20,000 Lumens,400 W MV-Pole) Sector: Lighting Description: Where City installs, owns, operates, and maintains lighting facilities. Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

144

Data:80938b34-a5a9-4346-a83f-924011d4d8cc | Open Energy Information  

Open Energy Info (EERE)

8b34-a5a9-4346-a83f-924011d4d8cc 8b34-a5a9-4346-a83f-924011d4d8cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cotton Electric Coop, Inc Effective date: 2010/02/01 End date if known: Rate name: General Service High Density-Three Phase Sector: Residential Description: * Available to residential consumers Subject to power cost adjustment and tax adjustment Source or reference: ISU Documentation Rate Binder Kelly # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

145

Data:9f0c55af-3663-456e-a3ed-e351a3a9a1dd | Open Energy Information  

Open Energy Info (EERE)

5af-3663-456e-a3ed-e351a3a9a1dd 5af-3663-456e-a3ed-e351a3a9a1dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc (New Mexico) Effective date: 2010/05/01 End date if known: Rate name: Seasonal With /AO HP/Water Heater Sector: Commercial Description: Source or reference: Rate Binder#8 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1

146

Data:D757572a-9ffa-42a1-9dbf-33f095d1a22f | Open Energy Information  

Open Energy Info (EERE)

2a-9ffa-42a1-9dbf-33f095d1a22f 2a-9ffa-42a1-9dbf-33f095d1a22f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Little Ocmulgee El Member Corp Effective date: 2009/01/01 End date if known: Rate name: 100 watt HPS - open bottom, Metered Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Additional fees may be charged Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

147

Data:9b7e3ffc-f95e-43b3-a9c3-e990ac62c383 | Open Energy Information  

Open Energy Info (EERE)

ffc-f95e-43b3-a9c3-e990ac62c383 ffc-f95e-43b3-a9c3-e990ac62c383 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mid-Kansas Electric Company, LLC (MKEC) Effective date: 2010/01/14 End date if known: Rate name: Local Access Delivery Service Sector: Commercial Description: Entire Service Area. For delivery to wholesale (sales for resale) customers over MKEC's 34.5 Kv (or other available lower primary voltage) subtransmission/distribution system. Source or reference: Rate Binder #6 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

148

Data:3c42138a-7a21-41f8-9b48-b5ac19eb7a9b | Open Energy Information  

Open Energy Info (EERE)

a-7a21-41f8-9b48-b5ac19eb7a9b a-7a21-41f8-9b48-b5ac19eb7a9b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Concord, Massachusetts (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: RATE R-1 RESIDENTIAL SERVICE - FARM (THREE PHASE) Sector: Residential Description: Additional Info Applicability: The Massachusetts Department of Food and Agriculture must certify the Customer as being eligible for the Farm Energy Discount Program. Once certified, this rate schedule is applicable to all electric service required by the Customer exclusively for domestic purposes for individual (single family) private residences.

149

Data:8da44762-9c34-48f2-a9da-edae05479083 | Open Energy Information  

Open Energy Info (EERE)

da44762-9c34-48f2-a9da-edae05479083 da44762-9c34-48f2-a9da-edae05479083 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Whitehall Electric Utility Effective date: 2010/02/15 End date if known: Rate name: Street Lighting- 150W HPS- Overhead Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish,install, and maintain street lighting units. This rate is subject to the Power Cost Adjustment Clause. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=6490 Source Parent: Comments Applicability Demand (kW)

150

Data:116aea86-881a-4fbd-9aad-a86d3ab7c0a9 | Open Energy Information  

Open Energy Info (EERE)

aea86-881a-4fbd-9aad-a86d3ab7c0a9 aea86-881a-4fbd-9aad-a86d3ab7c0a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule LO Lighting - Outdoor Area-100 watt sodium vapor lamp Sector: Lighting Description: Applicability This schedule is applicable to outdoor area lighting service for the illumination of areas where the District furnishes, installs, owns, operates and maintains the complete lighting installation. Monthly Usage: 50kWh Source or reference: http://www.tid.org/sites/default/files/documents/tidweb_content/Schedule%20LO%20_2009_.pdf

151

Data:48f8123f-5e9d-4963-a9a2-e050c619e4b0 | Open Energy Information  

Open Energy Info (EERE)

f-5e9d-4963-a9a2-e050c619e4b0 f-5e9d-4963-a9a2-e050c619e4b0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Colquitt Electric Membership Corp Effective date: 1993/06/01 End date if known: Rate name: 100W HPS-Open, UNDERGROUND WIRING,Metal Pole Sector: Lighting Description: Applicable to street and highway lighting owned by federal, state, or local governments or agencies thereof and to street lighting in residential subdivisions, apartment or condominium complexes, and mobile home parks by ballast operated vapor light fixtures and poles conforming to the Cooperative's specifications.

152

Data:9f306391-a6c8-464c-933c-16a8a9af47ff | Open Energy Information  

Open Energy Info (EERE)

a6c8-464c-933c-16a8a9af47ff a6c8-464c-933c-16a8a9af47ff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Polk County Rural Pub Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Urban General Service - Single Phase Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3

153

Data:3c47a678-f206-45b3-ab47-f6a9d5b56792 | Open Energy Information  

Open Energy Info (EERE)

a678-f206-45b3-ab47-f6a9d5b56792 a678-f206-45b3-ab47-f6a9d5b56792 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Florida Elec Coop, Inc Effective date: 2011/11/01 End date if known: Rate name: Rate Schedule RST Three Phase- Residential Time of Use Service Sector: Residential Description: Applicable, as an optional rate, to all members of the Cooperative for residential purposes only. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

154

Data:6b5c1fcd-428f-414c-a198-4f9a9bc3bb73 | Open Energy Information  

Open Energy Info (EERE)

fcd-428f-414c-a198-4f9a9bc3bb73 fcd-428f-414c-a198-4f9a9bc3bb73 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: La Plata Electric Assn, Inc Effective date: 2012/01/01 End date if known: Rate name: Irrigation Sector: Commercial Description: Source or reference: http://www.lpea.com/services/rates.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

155

Data:Ef52eb75-a9ce-431e-87dd-89f33d103339 | Open Energy Information  

Open Energy Info (EERE)

eb75-a9ce-431e-87dd-89f33d103339 eb75-a9ce-431e-87dd-89f33d103339 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Rock Hill, South Carolina (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: General Service/Demand (Schedule GD) Sector: Industrial Description: Availability: Available only to consumers with a metered demand of 30 kw to 750 kw, including commercial and industrial consumers, county buildings, schools, churches, and other eleemosynary consumers, for lighting, cooking, heating, refrigeration, water heating and other power service supplies to the individual store, industry, commercial establishment, or other qualified consumer through a single meter at one delivery point.

156

Data:Dedf14b2-f481-400a-9da7-ca656b99a260 | Open Energy Information  

Open Energy Info (EERE)

Dedf14b2-f481-400a-9da7-ca656b99a260 Dedf14b2-f481-400a-9da7-ca656b99a260 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Lyndonville, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Street Lighting (100 W HP Sodium with Pole) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3

157

Data:3de131c8-8f5e-4116-97a9-4873df735868 | Open Energy Information  

Open Energy Info (EERE)

8f5e-4116-97a9-4873df735868 8f5e-4116-97a9-4873df735868 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Perennial Public Power Dist Effective date: 2013/01/01 End date if known: Rate name: Municipal Pumping Service - Nontaxed (Rate Code 48) Three Phase Sector: Commercial Description: Municipal Pumping Service - Nontaxed (Rate Code 48): When energy is used for municipal pumping purposes, such as for sewer lifts or water pumping, the following rates shall apply. Tired rates = Purchased Power + Distribution Delivery Source or reference: http://www.perennialpower.com/Images/URBAN_GENERAL_AND_PUBLIC_SERVICE.pdf

158

Data:755c3504-1615-4e9a-9b0a-1d836f68b646 | Open Energy Information  

Open Energy Info (EERE)

c3504-1615-4e9a-9b0a-1d836f68b646 c3504-1615-4e9a-9b0a-1d836f68b646 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lansing, Michigan (Utility Company) Effective date: 2011/03/01 End date if known: Rate name: CUSTOMER OWNED SYSTEMS (High Pressure Sodium Luminaire 150 W) Sector: Lighting Description: Available to any political subdivision or agency of the State of Michigan for street lighting service for any system consisting of one or more luminaires where the BWL has an existing distribution system available. Source or reference: http://www.lansingmi.gov/Lansing/clerk/BWL_Proposed.pdf

159

Data:6abe6dcf-4386-4be2-a9bd-0b94736d7240 | Open Energy Information  

Open Energy Info (EERE)

abe6dcf-4386-4be2-a9bd-0b94736d7240 abe6dcf-4386-4be2-a9bd-0b94736d7240 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Smyrna Beach, Florida (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: MH-Providence 250 watts Sector: Lighting Description: Fixed Monthly Charge= Energy Rate + Maintenance Source or reference: http://ucnsb.org/pdf/Rates%20Charges%20and%20Fees.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

160

Data:C5e27afd-239d-459e-93a9-247dbf4bf7ec | Open Energy Information  

Open Energy Info (EERE)

7afd-239d-459e-93a9-247dbf4bf7ec 7afd-239d-459e-93a9-247dbf4bf7ec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lea County Electric Coop, Inc Effective date: 2009/08/30 End date if known: Rate name: Large Irrigation Service Sector: Residential Description: Available system-wide to irrigation service accounts with 50kW demand or above. Interruption Credit-Summer Peaking load available to depending on wholesale power provider securing approval for, and continuing implementation of, wholesale interruptible load management program. Source or reference: Illinois State University Archive Source Parent:

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Data:6f3b7e75-0665-40b9-a9f0-2de54c960914 | Open Energy Information  

Open Energy Info (EERE)

5-0665-40b9-a9f0-2de54c960914 5-0665-40b9-a9f0-2de54c960914 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Washington, North Carolina (Utility Company) Effective date: 2009/10/01 End date if known: Rate name: Medium General Service- Single-Phase Sector: Commercial Description: Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

162

Data:F8e4825c-48a9-4433-a420-74100429e13a | Open Energy Information  

Open Energy Info (EERE)

5c-48a9-4433-a420-74100429e13a 5c-48a9-4433-a420-74100429e13a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Hamilton, New York (Utility Company) Effective date: End date if known: Rate name: PUBS Sector: Commercial Description: Source or reference: Rate Binder #5B (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1

163

Data:538cfdf7-04f1-4876-9ee9-161a9cba9ddd | Open Energy Information  

Open Energy Info (EERE)

cfdf7-04f1-4876-9ee9-161a9cba9ddd cfdf7-04f1-4876-9ee9-161a9cba9ddd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Gulf States Louisiana LLC Effective date: 2011/10/28 End date if known: Rate name: 2 Area Lighting - Security light HPS - 100W Sector: Lighting Description: This rate is applicable under the regular terms and conditions of the company in areas designated by company where facilities of adequate capacity and suitable voltage are available. Source or reference: http://www.entergy-louisiana.com/content/price/tariffs/egsi/egsila_als.pdf Source Parent: Comments Applicability

164

Data:Af7556be-0163-4300-a9d0-4f5df6082f6f | Open Energy Information  

Open Energy Info (EERE)

556be-0163-4300-a9d0-4f5df6082f6f 556be-0163-4300-a9d0-4f5df6082f6f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Minnesota Power Inc Effective date: 2013/01/01 End date if known: Rate name: OUTDOOR AND AREA LIGHTING SERVICE MV 400 W (OPT 2) Sector: Lighting Description: To all classes of retail customers for outdoor lighting purposes (Rate Codes 76) and to persons other than governmental subdivisions for the purpose of lighting streets, alleys, roads, driveways and parking lots (Rate Code 77) subject to any applicable Riders. Rate Code 76 is not available on a seasonal or temporary basis.

165

Data:D80d58fb-40a7-49a9-9c18-62365ea596fd | Open Energy Information  

Open Energy Info (EERE)

fb-40a7-49a9-9c18-62365ea596fd fb-40a7-49a9-9c18-62365ea596fd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Burlington-Electric, Vermont (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Street Lighting (SL) Rate 250 Watt High Pressure Sodium Sector: Lighting Description: For municipal street lighting on city-accepted streets. Source or reference: https://www.burlingtonelectric.com/ELBO/assets/Tariff%20Sheets%20June%20262009%20revised-1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

166

Data:7864f012-ff4c-41c9-a976-9f667a9d7d88 | Open Energy Information  

Open Energy Info (EERE)

2-ff4c-41c9-a976-9f667a9d7d88 2-ff4c-41c9-a976-9f667a9d7d88 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Story City, Iowa (Utility Company) Effective date: 2004/01/01 End date if known: Rate name: High Pressure Sodium - 400 - Not metered Sector: Lighting Description: Source or reference: Ted Binder 1 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

167

Data:C77c3d84-c745-414a-9bf4-64461174d5f5 | Open Energy Information  

Open Energy Info (EERE)

d84-c745-414a-9bf4-64461174d5f5 d84-c745-414a-9bf4-64461174d5f5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Three Notch Elec Member Corp Effective date: 2012/03/01 End date if known: Rate name: 250W Overhead Wiring (Non Mercury vapor fixtures) - (Type - 'HPS-Cobra',Wood Pole (2)) Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for installation and maintenance.

168

Data:361821e3-113c-4a40-a9b1-becf02d08bae | Open Energy Information  

Open Energy Info (EERE)

e3-113c-4a40-a9b1-becf02d08bae e3-113c-4a40-a9b1-becf02d08bae No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Colquitt Electric Membership Corp Effective date: 1993/06/01 End date if known: Rate name: 150W Existing HPS-Cobra, UNDERGROUND WIRING, Metal or Fiberglass Pole Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

169

Data:A47574bf-a154-4e52-ab6b-21a9a670a163 | Open Energy Information  

Open Energy Info (EERE)

bf-a154-4e52-ab6b-21a9a670a163 bf-a154-4e52-ab6b-21a9a670a163 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Benton County Effective date: 2012/01/01 End date if known: Rate name: Street Lighting 250w MV-district owned metered. Sector: Lighting Description: Schedule 51 - Street Lighting Applicable: To governmental agencies and municipal corporations upon receipt of an authorized application for the supply of lighting facilities or energy and maintenance of lighting systems for public streets, alleys, throughfares, grounds and parks. Source or reference: http://www.bentonpud.org/images/site/flipbooks/BentonPUDPolicyRates%20%282%29/#/16/

170

Data:6c93d642-a568-431a-9ef5-28df373785a7 | Open Energy Information  

Open Energy Info (EERE)

3d642-a568-431a-9ef5-28df373785a7 3d642-a568-431a-9ef5-28df373785a7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rappahannock Electric Coop Effective date: End date if known: Rate name: LARGE POWER SUBSTATION DIRECT SERVICE SCHEDULE LP-3-RA_2 Sector: Industrial Description: APPLICABILITY Applicable to Customers whose delivery point is at the low voltage side of a substation where high side delivery is from transmission facilities of at least 34,500 volts. Source or reference: http://www.myrec.coop/content-documents/ScheduleLP-3-RA-Nv09.pdf Source Parent: Comments Applicability Demand (kW)

171

Data:4ad19850-86a9-40d8-be52-3c447a057189 | Open Energy Information  

Open Energy Info (EERE)

-86a9-40d8-be52-3c447a057189 -86a9-40d8-be52-3c447a057189 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stanton County Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Municipal Street Lighting Municipal Owned Lights 400W 15000LMV Sector: Lighting Description: Source or reference: ISU Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

172

Data:4101f160-5598-4e7a-9f61-742374a673a0 | Open Energy Information  

Open Energy Info (EERE)

f160-5598-4e7a-9f61-742374a673a0 f160-5598-4e7a-9f61-742374a673a0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Electric Coop, Inc (Florida) Effective date: End date if known: Rate name: Industrial Three- Phase Service Time- Of- Day Demand Schedule Sector: Industrial Description: On-Peak Demand Charge $13.00 Source or reference: http://tceconline.com/index.php?option=com_content&view=article&id=74&Itemid=63 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

173

Data:A4aa3092-2a9e-4002-af73-bc1f42951545 | Open Energy Information  

Open Energy Info (EERE)

aa3092-2a9e-4002-af73-bc1f42951545 aa3092-2a9e-4002-af73-bc1f42951545 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Woodruff Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: Outdoor lighting - Street Lights (Muncipal Owned) 250 W HPS, Metal pole Sector: Lighting Description: To unmetered automatically controlled outdoor lighting service burning all night. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

174

Data:6c7c0a9a-0f20-4233-bcdf-0d8de53252f4 | Open Energy Information  

Open Energy Info (EERE)

c0a9a-0f20-4233-bcdf-0d8de53252f4 c0a9a-0f20-4233-bcdf-0d8de53252f4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Middle Georgia El Member Corp Effective date: End date if known: Rate name: Outdoor Lighting Cobra Head 250 W Fiberglass Pole Sector: Lighting Description: Source or reference: http://www.mgemc.com/rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

175

Data:1de466cb-fa84-4445-ab38-d68c544a9e31 | Open Energy Information  

Open Energy Info (EERE)

de466cb-fa84-4445-ab38-d68c544a9e31 de466cb-fa84-4445-ab38-d68c544a9e31 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Escanaba, Michigan (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Electric Heat Suburban Industrial Sector: Industrial Description: To all customers for such service when separately metered upon application and approval of permanently installed equipment; subject to such rules and regulations as are established by the utility. When air conditioning is installed in an electrically heated area, it may be connected to the same meter for space conditioning purposes.

176

Data:F05501ce-540b-491a-8fd2-af084a9df7f3 | Open Energy Information  

Open Energy Info (EERE)

ce-540b-491a-8fd2-af084a9df7f3 ce-540b-491a-8fd2-af084a9df7f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Public Pwr Dist Effective date: 2012/05/01 End date if known: Rate name: Area&Directional Lighting Service Rate N725 - Fringe Sector: Lighting Description: Source or reference: Illinois State University Rate Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

177

Data:0cbe5424-619a-400a-9ba0-87d225808b01 | Open Energy Information  

Open Energy Info (EERE)

cbe5424-619a-400a-9ba0-87d225808b01 cbe5424-619a-400a-9ba0-87d225808b01 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nebraska Public Power District Effective date: 2013/01/01 End date if known: Rate name: 250 W Mercury Vapor- Enclosed Distribution Pole Sector: Lighting Description: 135 To all night street lighting service (dusk to daylight) from the overhead systems conforming to the District's standard specifications. Distribution Pole; Enclosed Electricity is provided through the Village, which obtains electric power from Nebraska Public Power District (NPPD) Source or reference: http://www.nppd.com/assets/municipalstreetlightingservice.pdf

178

Data:558c13ba-8cc8-4d8a-9e2e-098f8147fddd | Open Energy Information  

Open Energy Info (EERE)

ba-8cc8-4d8a-9e2e-098f8147fddd ba-8cc8-4d8a-9e2e-098f8147fddd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Howard Greeley Rural P P D Effective date: End date if known: Rate name: Idel Services Single Phase Sector: Commercial Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2

179

Data:A6a56848-f3a9-4690-bdb0-c1cf23310c21 | Open Energy Information  

Open Energy Info (EERE)

6848-f3a9-4690-bdb0-c1cf23310c21 6848-f3a9-4690-bdb0-c1cf23310c21 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tell City, Indiana (Utility Company) Effective date: 2011/03/01 End date if known: Rate name: Street Lighting, LED Retrofit: LED, Type 40 Sector: Lighting Description: The Fixed monthly charge entered here is the sum of the "Facilities" charge ($3.45) and the "Usage" charge ($1.83). When applicable: add $3.24 to the "Facilities" charge for Wood Pole, add $6.74 to the "Facilities" charge for Metal Round Pole Aluminum, add $11.33 to the "Facilities" charge for Metal Round Steel Decorative

180

Data:B1b36c2c-1417-49a9-84de-cae935fd41c0 | Open Energy Information  

Open Energy Info (EERE)

c2c-1417-49a9-84de-cae935fd41c0 c2c-1417-49a9-84de-cae935fd41c0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cimarron Electric Coop Effective date: 2002/02/01 End date if known: Rate name: Mercury Vapor Light - 175W Sector: Lighting Description: Available to all consumers of the Cooperative receiving service under any other retail rate schedule. Source or reference: ISU Documentation Source Parent: Comments Billing Adjustments: PCA (Based on 70 per kWh per light) and Tax Adjustment (Reference Sheet No.1) Each additional pole is $2.15 per month and buried cables cost an extra $1.5 per month.

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Data:448162b9-6072-409a-9b5f-1ba16f79dad0 | Open Energy Information  

Open Energy Info (EERE)

b9-6072-409a-9b5f-1ba16f79dad0 b9-6072-409a-9b5f-1ba16f79dad0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Arkansas Inc (Arkansas) Effective date: 2010/06/30 End date if known: Rate name: R2 Floodlights - HPS unshielded - 100W Flood Sector: Lighting Description: To un-metered automatically controlled outdoor lightning service burning all night. Source or reference: http://www.entergy-arkansas.com/content/price/tariffs/eai_l4.pdf Source Parent: Comments Not available for new costumers Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

182

Data:804e958a-8e4e-4c0e-a9ff-28d237c1773e | Open Energy Information  

Open Energy Info (EERE)

8a-8e4e-4c0e-a9ff-28d237c1773e 8a-8e4e-4c0e-a9ff-28d237c1773e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Portland, Michigan (Utility Company) Effective date: End date if known: Rate name: Residential Service Sector: Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

183

Data:85ad1e56-7ac7-499a-9d67-9054a75203ea | Open Energy Information  

Open Energy Info (EERE)

e56-7ac7-499a-9d67-9054a75203ea e56-7ac7-499a-9d67-9054a75203ea No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Trico Electric Cooperative Inc Effective date: 2009/08/01 End date if known: Rate name: Lighting Services 100 Watt HPS Sector: Lighting Description: *It is cooperative owned, operated and maintained. Subject to tax and wholesale power cost adjustment. Source or reference: http://www.trico.coop/images/TRICO_OL1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

184

Data:224aa1a0-31a9-4508-b66d-4196e198ffbc | Open Energy Information  

Open Energy Info (EERE)

a0-31a9-4508-b66d-4196e198ffbc a0-31a9-4508-b66d-4196e198ffbc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coos-Curry Electric Coop, Inc Effective date: 2011/12/22 End date if known: Rate name: Street Lighting, 400 Watt MV Sector: Lighting Description: * For public street lighting. Source or reference: Rate binder #4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

185

Data:F4eae5a9-fab8-4fb6-b602-addb8e062c0f | Open Energy Information  

Open Energy Info (EERE)

eae5a9-fab8-4fb6-b602-addb8e062c0f eae5a9-fab8-4fb6-b602-addb8e062c0f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lebanon, Indiana (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: SL - Public Street Lighting 150 watt sodium vapor Sector: Lighting Description: Availability Available for any standard overhead Public Street Lighting Service. Character of Service Public Street Lighting Service using lamps available under this schedule. Source or reference: http://www.lebanon-utilities.com/e_rates.html Source Parent: Comments Applicability Demand (kW) Minimum (kW):

186

Data:3c372eff-6897-4d5c-a99d-557a9c040780 | Open Energy Information  

Open Energy Info (EERE)

eff-6897-4d5c-a99d-557a9c040780 eff-6897-4d5c-a99d-557a9c040780 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tohono O'Odham Utility Auth Effective date: End date if known: Rate name: Mission View Senior Discount Rate Sector: Residential Description: Available to residential consumers in Mission View who are aged 65 and over for all uses subject to the established rules and regulations of TOUA. The charge shall not be less than $11.50. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

187

Data:1971c82f-271a-47df-9c51-479778dc05a9 | Open Energy Information  

Open Energy Info (EERE)

2f-271a-47df-9c51-479778dc05a9 2f-271a-47df-9c51-479778dc05a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Winfield, Kansas (Utility Company) Effective date: End date if known: Rate name: Rate schedule LIS 4(100), nonjurisdictional large industrial interruptible demand rate service Sector: Industrial Description: Source or reference: http://www.winfieldks.org/index.aspx?NID=201 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

188

Data:Dd6b2688-4a9c-4558-aadb-4d7abeba0790 | Open Energy Information  

Open Energy Info (EERE)

88-4a9c-4558-aadb-4d7abeba0790 88-4a9c-4558-aadb-4d7abeba0790 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Middle Georgia El Member Corp Effective date: End date if known: Rate name: Outdoor Lighting Parking and Street 250 W Wood Pole Sector: Lighting Description: Source or reference: http://www.mgemc.com/rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

189

Data:08b76cd3-a1c9-4427-a9bc-462d341169e4 | Open Energy Information  

Open Energy Info (EERE)

a1c9-4427-a9bc-462d341169e4 a1c9-4427-a9bc-462d341169e4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Louisville Electric System Effective date: 2012/11/01 End date if known: Rate name: Residential Service Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

190

Data:Bf708fd6-8615-47a9-baf6-3b73ccfaa544 | Open Energy Information  

Open Energy Info (EERE)

fd6-8615-47a9-baf6-3b73ccfaa544 fd6-8615-47a9-baf6-3b73ccfaa544 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 8am-8pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

191

Data:51cd6188-9d1c-43b8-915a-9ba53cb4bdf1 | Open Energy Information  

Open Energy Info (EERE)

cd6188-9d1c-43b8-915a-9ba53cb4bdf1 cd6188-9d1c-43b8-915a-9ba53cb4bdf1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Edgecombe-Martin County E M C Effective date: 2011/07/01 End date if known: Rate name: RENEWABLE ENERGY PORTFOLIO STANDARD RIDER-Industrial Sector: Industrial Description: APPLICABILITY: Service under this Rider is applicable to all retail consumers of the Cooperative for the recovery of the Cooperative's incremental costs associated with meeting their Renewable Energy Portfolio Standard (REPS) pursuant to North Carolina General Statute 62-133.8 and NCUC Rule R8-67. DEFINITIONS:

192

Data:Dba15cce-1778-403e-a9a7-deb7a121e54a | Open Energy Information  

Open Energy Info (EERE)

Dba15cce-1778-403e-a9a7-deb7a121e54a Dba15cce-1778-403e-a9a7-deb7a121e54a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Newton, North Carolina (Utility Company) Effective date: 2013/01/01 End date if known: 2014/07/01 Rate name: Electric Renewable Energy Credit Rider - RECR - 1 - Solar Photovoltaic Energy - Variable Sector: Description: Source or reference: http://www.newtonnc.gov/departments/finance/finance_documents.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

193

Data:Cd009a9b-7cd6-4d5b-8954-a68f5f8661ab | Open Energy Information  

Open Energy Info (EERE)

a9b-7cd6-4d5b-8954-a68f5f8661ab a9b-7cd6-4d5b-8954-a68f5f8661ab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Perennial Public Power Dist Effective date: 2013/01/01 End date if known: Rate name: IRRIGATION Anytime Control (Rate Code 15) Sector: Commercial Description: AVAILABILITY: To seasonal customers for irrigation pump motors, pivot wheel motors, reuse pits and booster pumps. TYPE OF SERVICE: A.C., 60 cycles, single-phase or three-phase at any of the District's standard voltages. Source or reference: http://www.perennialpower.com/Images/IRRIGATION.pdf Source Parent: Comments Applicability

194

Data:1604d236-f7f9-430a-9f71-b66e53ec22ff | Open Energy Information  

Open Energy Info (EERE)

d236-f7f9-430a-9f71-b66e53ec22ff d236-f7f9-430a-9f71-b66e53ec22ff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Independence, Missouri (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Residential Service Sector: Residential Description: To single family dwelling units supplied through one meter and individually metered apartments for all domestic uses. Source or reference: http://www.ci.independence.mo.us/PL/Rates.aspx Source Parent: Comments Minimum monthly charge of $4.14. Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

195

Data:62ad4f60-28ca-4a9b-97fe-1b2b31286b7f | Open Energy Information  

Open Energy Info (EERE)

f60-28ca-4a9b-97fe-1b2b31286b7f f60-28ca-4a9b-97fe-1b2b31286b7f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lee County Electric Coop, Inc Effective date: 2008/07/01 End date if known: Rate name: Private Area Lighting- (250W HPS) Sector: Lighting Description: Applicable to customers, other than Street Light Districts, for automatically controlled dusk-to-dawn outdoor lighting where existing overhead secondary circuits are located. Source or reference: https://www.lcec.net/pdf/EntireRateTariff.pdf#page=18 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

196

Data:86cd21ff-e353-453a-9b97-a74c14fafc4b | Open Energy Information  

Open Energy Info (EERE)

e353-453a-9b97-a74c14fafc4b e353-453a-9b97-a74c14fafc4b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anaheim, California (Utility Company) Effective date: 2012/09/12 End date if known: Rate name: Lighting- Unmetered- 175W Mercury Vapor Sector: Lighting Description: Applicable to street and highway lighting where customer owns and maintains street lighting equipment. Source or reference: http://www.anaheim.net/utilities/ElectricRules/SCHD-LS2.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

197

Data:720229fa-4def-4aff-a9ea-d618d5d26d85 | Open Energy Information  

Open Energy Info (EERE)

29fa-4def-4aff-a9ea-d618d5d26d85 29fa-4def-4aff-a9ea-d618d5d26d85 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Three Notch Elec Member Corp Effective date: 2012/03/01 End date if known: Rate name: 100W Underground Wiring (Non Mercury vapor fixtures) - (Type - 'HPS-Open',WoodPole(2)) Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for installation and maintenance.

198

Data:Cc57d938-7976-42a9-9b08-0b225deb40b9 | Open Energy Information  

Open Energy Info (EERE)

38-7976-42a9-9b08-0b225deb40b9 38-7976-42a9-9b08-0b225deb40b9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ozarks Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: LTG-MUN - 250 Watt MVL - Unshielded Sector: Lighting Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

199

Data:Ba3b9494-7974-407a-9d6e-e6172cbfbada | Open Energy Information  

Open Energy Info (EERE)

b9494-7974-407a-9d6e-e6172cbfbada b9494-7974-407a-9d6e-e6172cbfbada No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nebraska Public Power District Effective date: 2013/01/01 End date if known: Rate name: 250 W Mercury Vapor- Distribution Pole Sector: Lighting Description: 134 To all night street lighting service (dusk to daylight) from the overhead systems conforming to the District's standard specifications. Distribution Pole; Open Refractor Electricity is provided through the Village, which obtains electric power from Nebraska Public Power District (NPPD) Source or reference: http://www.nppd.com/assets/municipalstreetlightingservice.pdf

200

Data:5be3b070-88a9-4ec9-b154-a1b2ccefa729 | Open Energy Information  

Open Energy Info (EERE)

b070-88a9-4ec9-b154-a1b2ccefa729 b070-88a9-4ec9-b154-a1b2ccefa729 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: NSTAR Electric Company Effective date: 2012/04/01 End date if known: Rate name: ACTON Basic rate T2 (SEMA) Sector: Industrial Description: Default Generation Service ("Default Service") shall be available to any Customer who, for any reason, is not receiving Generation Service from a Competitive Supplier. Service under this rate to any Customer is subject to both the Company's printed requirements and the Company's Terms and Conditions - Distribution Service, each as in effect from time to time.

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Data:932b57f7-e60f-482a-9b83-e9da2b25730d | Open Energy Information  

Open Energy Info (EERE)

f7-e60f-482a-9b83-e9da2b25730d f7-e60f-482a-9b83-e9da2b25730d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wild Rice Electric Coop, Inc Effective date: 2012/03/18 End date if known: Rate name: FARM AND HOME SERVICE - Up to 37.5 KVA transformer Sector: Residential Description: Source or reference: http://www.wildriceelectric.com/b-rate.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

202

Data:A4444000-d511-413f-a9f7-a4f937228e9d | Open Energy Information  

Open Energy Info (EERE)

000-d511-413f-a9f7-a4f937228e9d 000-d511-413f-a9f7-a4f937228e9d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: End date if known: Rate name: Large Power Contract Secondary Sector: Description: Excess kVA Source or reference: http://www.les.com/your_business/rate_schedules_lpc.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

203

Data:D3ab3b72-3961-4b52-bd14-f2f0a8fce1a9 | Open Energy Information  

Open Energy Info (EERE)

b72-3961-4b52-bd14-f2f0a8fce1a9 b72-3961-4b52-bd14-f2f0a8fce1a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Atlantic City Electric Co Effective date: 2012/11/01 End date if known: Rate name: AGS Secondary (Delivery Service) Sector: Commercial Description: Available at any point of Company's system where facilities of adequate character and capacity exist for the entire electric service requirements of any customer contracting for annual service delivered at one point and metered at or compensated to the voltage of delivery. This is an unbundled service Source or reference: http://www.atlanticcityelectric.com/_res/documents/NJTariffSectionIV.pdf

204

Data:D9cf2a40-3e87-4472-9f36-a9d2f86b1485 | Open Energy Information  

Open Energy Info (EERE)

3e87-4472-9f36-a9d2f86b1485 3e87-4472-9f36-a9d2f86b1485 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northwestern Rural E C A, Inc Effective date: 2013/01/01 End date if known: Rate name: Three Phase Service - Time of Use Sector: Commercial Description: AVAILABILITY Available only to those customers taking service hereunder as of November 1, 2003. Source or reference: http://www.northwesternrec.com/myHome/billingAndPayments/rates.aspx Source Parent: Comments NOT ENOUGH INFO DUE TO ARBITRARY ON PEAK & OFF PEAK. Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

205

Data:22a1debf-5651-43a9-8ca0-9ed01353521b | Open Energy Information  

Open Energy Info (EERE)

debf-5651-43a9-8ca0-9ed01353521b debf-5651-43a9-8ca0-9ed01353521b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Harrison County Rural E M C Effective date: 2011/11/01 End date if known: Rate name: Schedule I-2 Irrigation (Uncontrolled)(Rate 4) Sector: Commercial Description: Source or reference: http://www.recinfocenter.com/UserDocs/Library/RATES.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

206

Data:3549f3b5-25eb-49b8-b42d-fb2bef6a9de7 | Open Energy Information  

Open Energy Info (EERE)

b5-25eb-49b8-b42d-fb2bef6a9de7 b5-25eb-49b8-b42d-fb2bef6a9de7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Utility District No 2 Effective date: 2011/10/01 End date if known: Rate name: Street Lighting 100 Watt HPS (city owned) Sector: Lighting Description: Service under this schedule shall be available to municipalities, incorporated cities, towns or lighting districts for the illumination of streets, roadways, thoroughfares, and alleys. Lighting Structure: 35-foot wood pole $ 10.00 Source or reference: http://www.pacificpud.org/rate_street.html Source Parent: Comments Applicability

207

Data:800db00a-d01d-4d61-a9ee-29f21aec61ac | Open Energy Information  

Open Energy Info (EERE)

a-d01d-4d61-a9ee-29f21aec61ac a-d01d-4d61-a9ee-29f21aec61ac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Paris, Tennessee (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: Outdoor Lighting Rate- LS- Part A Sector: Lighting Description: Available for service to street and park lighting systems, traffic signal systems, athletic lighting installations, and outdoor lighting for individual customers. Source or reference: ISU Documentation Rate Binder Ted #11 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

208

Data:1ef2f6f9-fc3d-4343-8a9c-46a36f108eda | Open Energy Information  

Open Energy Info (EERE)

fc3d-4343-8a9c-46a36f108eda fc3d-4343-8a9c-46a36f108eda No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Wakefield, Michigan (Utility Company) Effective date: 2007/03/01 End date if known: Rate name: Off Peak Sector: Description: Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

209

Data:Ba03f94a-6f3a-4886-98a9-470ef22f266a | Open Energy Information  

Open Energy Info (EERE)

a-6f3a-4886-98a9-470ef22f266a a-6f3a-4886-98a9-470ef22f266a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Guntersville Electric Board Effective date: 2012/10/01 End date if known: Rate name: GSA 3 Sector: Commercial Description: Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Subject to Revenue adjustment,FCA and environmental adjustment Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

210

Data:6b68bb44-fdbb-4a89-a9c5-9cec76212cb6 | Open Energy Information  

Open Energy Info (EERE)

4-fdbb-4a89-a9c5-9cec76212cb6 4-fdbb-4a89-a9c5-9cec76212cb6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rochester Public Utilities Effective date: 2009/01/01 End date if known: Rate name: Residential service rate Sector: Residential Description: At all locations where facilities of adequate capacity and suitable voltage are adjacent to the premises to be served. Where service desired by the customer is not adjacent to the premises to be served, additional contract arrangements may be required prior to service being furnished. MINIMUM BILL: $14.50 per month. Source or reference: http://www.rpu.org/documents/2012_rate_schedule.pdf

211

Data:C3d16789-6471-445f-81a9-1d3f6c023576 | Open Energy Information  

Open Energy Info (EERE)

789-6471-445f-81a9-1d3f6c023576 789-6471-445f-81a9-1d3f6c023576 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Newton, North Carolina (Utility Company) Effective date: 2013/01/01 End date if known: 2014/07/01 Rate name: Electric Renewable Energy Credit Rider - RECR - 1 - Solar Photovoltaic Energy - 10 Year Fixed Sector: Description: Source or reference: http://www.newtonnc.gov/departments/finance/finance_documents.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

212

Data:8d370609-360d-4d9a-9aa8-eaaa3b01464f | Open Energy Information  

Open Energy Info (EERE)

360d-4d9a-9aa8-eaaa3b01464f 360d-4d9a-9aa8-eaaa3b01464f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Davis Elec Coop, Inc Effective date: 2000/06/01 End date if known: Rate name: Extra Large Power Service Sector: Commercial Description: Available to commercial and industrial consumers on an annual basis only whose maximum demand exceeds 1500 kW per month, subject to the established rules and regulations of the cooperative. Source or reference: www.jdec.org Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

213

Data:5f44458d-515a-40c1-a9de-65fae2952ac4 | Open Energy Information  

Open Energy Info (EERE)

d-515a-40c1-a9de-65fae2952ac4 d-515a-40c1-a9de-65fae2952ac4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salmon River Electric Coop Inc Effective date: 2004/02/21 End date if known: Rate name: Single Phase Master Metered (Non Demand) RV Parks (1300-1399 local access) Sector: Residential Description: Service under this schedule is available to master-metered mobile home parks and recreational vehicle (RV) parks. The type of service provided under this schedule is single phase, at the standard voltage available for the premises to be served, supplied through one meter at one point of delivery.

214

Data:775b69a9-e337-4874-8bb8-93d6bad4e611 | Open Energy Information  

Open Energy Info (EERE)

b69a9-e337-4874-8bb8-93d6bad4e611 b69a9-e337-4874-8bb8-93d6bad4e611 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Spiceland, Indiana (Utility Company) Effective date: End date if known: Rate name: Residential- Water Heater Service (30 to 74 gallon capacity) Sector: Residential Description: Source or reference: Rate Binder#1 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

215

Data:29166ac5-4a9a-4dae-b635-aea4e3b8c30c | Open Energy Information  

Open Energy Info (EERE)

ac5-4a9a-4dae-b635-aea4e3b8c30c ac5-4a9a-4dae-b635-aea4e3b8c30c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Imperial Irrigation District Effective date: 1994/01/01 End date if known: Rate name: SCHEDULE SL-1 STREET AND HIGHWAY LIGHTING SERVICE-HIGH-PRESSURE SODIUM VAPOR 400W Sector: Lighting Description: APPLICABILITY Applicable to service to street and highway lighting installations supplied from overhead lines, where the District owns and maintains the entire equipment. Monthly Usage: 160kWh Source or reference: http://www.iid.com/Modules/ShowDocument.aspx?documentid=2577 Source Parent:

216

Data:38b10d76-8f59-4621-8c4a-9edbf21ecb25 | Open Energy Information  

Open Energy Info (EERE)

d76-8f59-4621-8c4a-9edbf21ecb25 d76-8f59-4621-8c4a-9edbf21ecb25 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cairo, Georgia (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Residential Electric Rates Sector: Residential Description: This rate is applicable for all residential customers. Subject to power cost adjustment. Source or reference: Rate Binder # 2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

217

Data:66c37bc7-8f7e-42a9-8838-80236ced9ecd | Open Energy Information  

Open Energy Info (EERE)

c37bc7-8f7e-42a9-8838-80236ced9ecd c37bc7-8f7e-42a9-8838-80236ced9ecd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No4 Pinal Cnty Effective date: 2009/01/01 End date if known: Rate name: Night Light Rate- 250 W HPS Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

218

Data:Ad379e85-a9ed-4058-bf6e-67fd50be309d | Open Energy Information  

Open Energy Info (EERE)

e85-a9ed-4058-bf6e-67fd50be309d e85-a9ed-4058-bf6e-67fd50be309d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Atlantic City Electric Co Effective date: 2012/11/01 End date if known: Rate name: MGS Secondary CIEP<500kW Three Phase Sector: Commercial Description: Available at any point of Company's system where facilities of adequate character and capacity exist for the entire electric service requirements of any customer delivered at one point and metered at or compensated to the voltage of delivery. This schedule is not available to residential customers. Bundled Service Source or reference: http://www.atlanticcityelectric.com/_res/documents/NJTariffSectionIV.pdf

219

Data:Ec80cb9e-66ca-418a-9deb-6a653ee29990 | Open Energy Information  

Open Energy Info (EERE)

cb9e-66ca-418a-9deb-6a653ee29990 cb9e-66ca-418a-9deb-6a653ee29990 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clark Electric Coop Effective date: 2007/11/01 End date if known: Rate name: Rider 2- Power Cost Adjustment- Controlled Sector: Description: Applicable to Price Schedule 63, 70, 73, 74, 84, 86 The Power Cost Adjustment charge shall provide for change of the price per kilowatt hour consumed to equal the average cost per kilowatt hour delivered by the utility's system. Prior to each billing cycle the Cooperative shall determine the adjustment amount to be charged for each energy unit, consumed under the rates set forth by the Cooperative. The calculation shall be:

220

Data:57a7c6b5-bbc0-4a9c-b0ae-29f580053df1 | Open Energy Information  

Open Energy Info (EERE)

c6b5-bbc0-4a9c-b0ae-29f580053df1 c6b5-bbc0-4a9c-b0ae-29f580053df1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Auburn Board of Public Works Effective date: 2012/01/01 End date if known: Rate name: Urban Electric Space Heating(Three Phase-Winter) Sector: Commercial Description: To customers within the corporate limits of the city of Auburn, NE as a rider to the General Service or Demand Service where only electric heating, cooling, and electric water heating, and associated equipment are connected as a separate service. Source or reference: http://auburnbpw.com/wp-content/files/2012_Electric_Rates.pdf

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Data:61f1eaac-8a9e-4682-8ff5-b409965b036d | Open Energy Information  

Open Energy Info (EERE)

eaac-8a9e-4682-8ff5-b409965b036d eaac-8a9e-4682-8ff5-b409965b036d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Newton, North Carolina (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: General Service Sector: Commercial Description: This Schedule is not available to the individual who qualifies for a residential or industrial schedule not for auxiliary or breakdown service. Power delivered under this schedule shall not be used for resale or exchange or in parallel with other electric power or as a substitute for power contracted for or which may be contracted expressed in writing in the contract with the customer.

222

Data:020e0800-d463-452a-9f59-b87d709d6590 | Open Energy Information  

Open Energy Info (EERE)

20e0800-d463-452a-9f59-b87d709d6590 20e0800-d463-452a-9f59-b87d709d6590 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware County Elec Coop Inc Effective date: 2012/07/01 End date if known: Rate name: Security Lights(100 W HPS-Unmetered) Sector: Lighting Description: The member will need to furnish a designated location for the Security Light unit, the pole and anchors (if existing transformer pole is not an option), permit any tree trimming required for conductors or unit installation, and to pay for the service at the following rates Source or reference: http://www.dce.coop/content/security-lights

223

Data:4a3349a9-0449-4c08-a6ae-75f028693d53 | Open Energy Information  

Open Energy Info (EERE)

a9-0449-4c08-a6ae-75f028693d53 a9-0449-4c08-a6ae-75f028693d53 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Benton County Effective date: 2012/01/01 End date if known: Rate name: Agricultural Irrigation Sprinkler Whellturning Sector: Commercial Description: Applicable:To agricultural irrigation power for wheelturning for customers that are not subject to the Annual Facilities Charge. Source or reference: http://www.bentonpud.org/images/site/flipbooks/BentonPUDPolicyRates%20%282%29/#/24/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

224

Data:9ace44c6-c341-42ff-9a9c-959d61a7c9dc | Open Energy Information  

Open Energy Info (EERE)

ace44c6-c341-42ff-9a9c-959d61a7c9dc ace44c6-c341-42ff-9a9c-959d61a7c9dc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anaheim, California (Utility Company) Effective date: 2011/12/01 End date if known: Rate name: Developmental Feed-In Tariff Sector: Residential Description: Applicable to owners and operators of electric generation facilities located within the City's service territory who wish to sell to the City the renewable power output from an eligible small-scale Distributed Generation Resource, with capacity of not more than 3 MW. Source or reference: http://www.anaheim.net/utilities/ElectricRules/FEEDIN.pdf

225

Data:5d84711a-9d1e-4879-8b9f-1d493a3fd0ea | Open Energy Information  

Open Energy Info (EERE)

a-9d1e-4879-8b9f-1d493a3fd0ea a-9d1e-4879-8b9f-1d493a3fd0ea No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Platte-Clay Electric Coop, Inc Effective date: 2013/01/01 End date if known: Rate name: SL - 1000 watt MH Ball Park Light Sector: Lighting Description: Available for lighting streets, walkways, or outdoor lighting of public or private areas when such facilities are operated and maintained as an extension of the Cooperative's distribution system. Electric usage will be unmetered. Source or reference: Rate Binder Kelly 11 ISU Documentation Source Parent: Comments Applicability Demand (kW)

226

Data:98291a67-b152-44fe-bc28-f57d157fd5a9 | Open Energy Information  

Open Energy Info (EERE)

7-b152-44fe-bc28-f57d157fd5a9 7-b152-44fe-bc28-f57d157fd5a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Wakefield, Michigan (Utility Company) Effective date: 2007/03/01 End date if known: Rate name: Residential Sector: Residential Description: Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

227

Data:De7bd0a9-824f-40b0-800e-23be47597208 | Open Energy Information  

Open Energy Info (EERE)

bd0a9-824f-40b0-800e-23be47597208 bd0a9-824f-40b0-800e-23be47597208 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Walton Electric Member Corp Effective date: 2006/06/01 End date if known: Rate name: Sec A 175 Watt 66 kWh Sector: Lighting Description: Source or reference: http://www.waltonemc.com/commercial/ Source Parent: Comments Monthly Charge= Controlled Energy Charge + Continuous Burning Charge Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

228

Data:67d1e48e-354b-418a-9e97-b969a31fb754 | Open Energy Information  

Open Energy Info (EERE)

e-354b-418a-9e97-b969a31fb754 e-354b-418a-9e97-b969a31fb754 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/07/01 End date if known: Rate name: Area Lighting-High Pressure Sodium-1,000 watts-Within Corporate Limits Sector: Lighting Description: For the purpose of paying the expenses of conducting and managing the Electric Division, Utilities Department of the City, the City Manager is hereby authorized and directed to charge the following rates for furnishing electric current for outdoor lights, which rates are hereby adopted, for all utility bills issued on and after July 1, 1990

229

Data:C2cc8122-0d0a-4c79-bbf0-a9d0a2166b40 | Open Energy Information  

Open Energy Info (EERE)

cc8122-0d0a-4c79-bbf0-a9d0a2166b40 cc8122-0d0a-4c79-bbf0-a9d0a2166b40 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bangor Hydro-Electric Co Effective date: 2012/07/01 End date if known: Rate name: Periodic High pressure sodium-400 watts Sector: Lighting Description: Service under this rate is available for street and area lighting service installations, maintenance and use of energy, and traffic control lighting service provided the customer furnishes the equipment. Customers taking service under this rate schedule are responsible for paying both Distribution Service and Stranded Cost.

230

Data:E1f72243-22a9-48f0-b971-70d12ccf0f97 | Open Energy Information  

Open Energy Info (EERE)

43-22a9-48f0-b971-70d12ccf0f97 43-22a9-48f0-b971-70d12ccf0f97 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware Electric Cooperative Effective date: 2011/02/01 End date if known: Rate name: General Service--Schedule GS Sector: Commercial Description: Available to Members of the Cooperative for all non-residential Electric Delivery or Electric Supply and Delivery Service with a maximum average monthly demand of less than 50 KW during the previous twelve (12) months including commercial and small industrial service Source or reference: http://www.delaware.coop/my-services/commercial-and-industrial/billing/rates

231

Data:Bc946a34-ed0a-4935-be3f-929a342a9d99 | Open Energy Information  

Open Energy Info (EERE)

a34-ed0a-4935-be3f-929a342a9d99 a34-ed0a-4935-be3f-929a342a9d99 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Rockwood, Tennessee (Utility Company) Effective date: 2012/12/01 End date if known: Rate name: Outdoor Lighting Metal Halide Decorative Type 175w Sector: Lighting Description: ROCKWOOD ELECRIC UTILITY can install a private security light on your residential or commercial property under most conditions. All new requests for outdoor lighting require the applicant to sign a minimum two year contract for security lighting service. If you have security concerns and would like to discuss outdoor lighting options, please contact our Engineering Department to look at the situation with you.

232

Data:342c229f-77a4-4ba8-94a3-1a9e79770875 | Open Energy Information  

Open Energy Info (EERE)

9f-77a4-4ba8-94a3-1a9e79770875 9f-77a4-4ba8-94a3-1a9e79770875 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lansing, Michigan (Utility Company) Effective date: 2011/03/01 End date if known: Rate name: CUSTOMER OWNED SYSTEMS (Mercury Vapor Luminaire 400 W) Sector: Lighting Description: Available to any political subdivision or agency of the State of Michigan for street lighting service for any system consisting of one or more luminaires where the BWL has an existing distribution system available. Source or reference: http://www.lansingmi.gov/Lansing/clerk/BWL_Proposed.pdf Source Parent:

233

Data:6486f71f-cad2-4a8a-9aa6-bba9ed09abfb | Open Energy Information  

Open Energy Info (EERE)

f-cad2-4a8a-9aa6-bba9ed09abfb f-cad2-4a8a-9aa6-bba9ed09abfb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grand Electric Coop, Inc Effective date: 2012/07/01 End date if known: Rate name: Schedule ADF -Du al Fuel Service Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

234

Data:43933ea3-8a27-4493-a9a6-70cf143f8e4a | Open Energy Information  

Open Energy Info (EERE)

-8a27-4493-a9a6-70cf143f8e4a -8a27-4493-a9a6-70cf143f8e4a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Navajo Tribal Utility Authority Effective date: End date if known: Rate name: Public Street, Highway and Private Area Lighting Sector: Lighting Description: Source or reference: http://www.ntua.com/utility_rates/PublicHighwayArea_Lighting.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

235

Data:90b88357-aed9-419f-b14d-aa2111584b49 | Open Energy Information  

Open Energy Info (EERE)

8357-aed9-419f-b14d-aa2111584b49 8357-aed9-419f-b14d-aa2111584b49 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc (New Mexico) Effective date: 2010/05/01 End date if known: Rate name: Commercial/Industrial With Water Heater Sector: Industrial Description: Source or reference: Rate Binder#8 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

236

Data:3d0331c1-5fbe-46a9-bbf7-5ee1341cb968 | Open Energy Information  

Open Energy Info (EERE)

d0331c1-5fbe-46a9-bbf7-5ee1341cb968 d0331c1-5fbe-46a9-bbf7-5ee1341cb968 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Power and Light Secondary Sector: Industrial Description: This rate is available to Power and Light customers who take service from distribution secondary lines or transformers. On-Peak Season monthly usage must be greater than 8,000 kWh. Source or reference: ISU Documentation Rate Binder Ted #9 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

237

Data:F0fa5450-6dff-4e27-af89-4a9aa964001e | Open Energy Information  

Open Energy Info (EERE)

450-6dff-4e27-af89-4a9aa964001e 450-6dff-4e27-af89-4a9aa964001e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rolling Hills Electric Coop Effective date: 2010/07/01 End date if known: Rate name: Private Street and Area Lighting (PSL-10) Unmetered HPS 200W Sector: Lighting Description: http://rollinghills.coopwebbuilder.com/sites/rollinghills.coopwebbuilder.com/files/rate_tariffs.pdf Source or reference: http://rollinghills.coopwebbuilder.com/sites/rollinghills.coopwebbuilder.com/files/rate_tariffs.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

238

Data:B54b21de-3c63-405a-9ea9-f152c09b3c13 | Open Energy Information  

Open Energy Info (EERE)

b21de-3c63-405a-9ea9-f152c09b3c13 b21de-3c63-405a-9ea9-f152c09b3c13 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Rockwood, Tennessee (Utility Company) Effective date: 2012/12/01 End date if known: Rate name: Residential Sector: Residential Description: "applies only to electric service to a single-family dwelling and its appurtenances, where the major use of electricity is for domestic purposes such as lighting, household appliances, and the personal comfort and convenience of those residing therein..." Source or reference: http://www.rockwoodelectric.com/rates.asp

239

Data:C2ce0819-d6c4-41a9-8836-2ac0c7dfae14 | Open Energy Information  

Open Energy Info (EERE)

819-d6c4-41a9-8836-2ac0c7dfae14 819-d6c4-41a9-8836-2ac0c7dfae14 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Potomac Electric Power Co Effective date: End date if known: Rate name: Residential All - Electric Service - Schedule AE Sector: Description: there are multiple monthly charges, which cannot be entered into out system. Source or reference: http://www.pepco.com/_res/documents/DCRates_AE.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

240

Data:E3f81776-ab00-4c28-a9a1-4c81c2932922 | Open Energy Information  

Open Energy Info (EERE)

776-ab00-4c28-a9a1-4c81c2932922 776-ab00-4c28-a9a1-4c81c2932922 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Story City, Iowa (Utility Company) Effective date: 2004/01/01 End date if known: Rate name: Mercury Vapor - 100 Watt Sector: Lighting Description: Source or reference: Ted binder 1 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Data:78d3f9df-98b3-43a9-9fd6-14c265e09420 | Open Energy Information  

Open Energy Info (EERE)

df-98b3-43a9-9fd6-14c265e09420 df-98b3-43a9-9fd6-14c265e09420 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers Electric Company, Ltd Effective date: 2012/06/01 End date if known: Rate name: Residential-Single Phase Sector: Residential Description: Less than 50kW Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

242

Data:B6e93535-7a8d-462a-9ced-14fbc31495b9 | Open Energy Information  

Open Energy Info (EERE)

35-7a8d-462a-9ced-14fbc31495b9 35-7a8d-462a-9ced-14fbc31495b9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eugene, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: J-4 (Customer-Owned Street Lighting Service) 1000 Watt High Pressure Sodium Sector: Lighting Description: To governmental agency, lighting district, and water district-owned daily, dusk-to-dawn lighting systems which illuminate streets, alleys, and thoroughfares used primarily for motorized vehicular traffic and which meet EWEB's specifications. Source or reference: http://www.eweb.org/public/documents/policies/electric5.pdf

243

Data:31ad0a32-c355-4594-a400-269daced2a9c | Open Energy Information  

Open Energy Info (EERE)

a32-c355-4594-a400-269daced2a9c a32-c355-4594-a400-269daced2a9c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bristol Virginia Utilities Effective date: 2013/08/01 End date if known: Rate name: Outdoor Lighting-Private Area Lighting-High Pressure Sodium 250 Watt - Summer Sector: Lighting Description: Source or reference: http://www.bvu-optinet.com/templates/default.php?purl=electric_main&turl=inside_3col_std_template.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

244

Data:E5ae26a9-c82c-4da9-b58c-af18baadfc70 | Open Energy Information  

Open Energy Info (EERE)

6a9-c82c-4da9-b58c-af18baadfc70 6a9-c82c-4da9-b58c-af18baadfc70 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Snohomish County PUD No 1 Effective date: 2013/04/01 End date if known: Rate name: GENERAL SERVICE SMALL LOAD Sector: Commercial Description: This rate schedule does not apply to a "New Large Single Load" as defined in Rate Schedule 37. Such loads shall be served by Rate Schedule 37 - New Large Single Loads. Source or reference: http://www.snopud.com/Site/Content/Documents/rates/ElectricRates040113.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

245

Data:2d616a7c-22e4-427e-91c6-c1eebd3a9a7d | Open Energy Information  

Open Energy Info (EERE)

c-22e4-427e-91c6-c1eebd3a9a7d c-22e4-427e-91c6-c1eebd3a9a7d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Heartland Rural Elec Coop, Inc Effective date: 2009/08/01 End date if known: Rate name: METERED SECURITY LIGHTING: 100 Watt High Pressure Sodium Light Sector: Lighting Description: AVAILABILITY This schedule is available for metered outdoor lighting service to any Customer. New or replacement light installations shall be limited to high pressure sodium and metal-halide lights. Source or reference: http://www.heartland-rec.com/documents/HRECTarriffsAug09web.pdf Source Parent: Comments

246

Data:8f9d6869-b774-43a9-a838-372046488da4 | Open Energy Information  

Open Energy Info (EERE)

d6869-b774-43a9-a838-372046488da4 d6869-b774-43a9-a838-372046488da4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Benton County Effective date: 2012/01/01 End date if known: Rate name: INTERCONNECTION, TRANSFER OF POWER AGREEMENTS, AND CONSTRUCTION OPERATION AND MAINTENANCE AGREEMENTS Sector: Commercial Description: Applicable: To Interconnection Agreement customers generating not more than 300 kW measured demand at all times. To Transfer of Power Agreements, and Construction Operation and Maintenance Agreements. Source or reference: http://www.bentonpud.org/images/site/flipbooks/BentonPUDPolicyRates%20%282%29/#/28/

247

Data:C4e629a9-ce4c-49c8-af2d-e1d7245d85ef | Open Energy Information  

Open Energy Info (EERE)

9a9-ce4c-49c8-af2d-e1d7245d85ef 9a9-ce4c-49c8-af2d-e1d7245d85ef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: Schedule B - Small General Service - City of Fife Sector: Commercial Description: For Nonresidential lighting, heating, and incidental power uses where demand meter may be installed. Also for nonresidential incidental powers uses where a meter is not installed. Source or reference: www.mytpu.org/file_viewer.aspx?id=6167 Source Parent: Comments Applicability Demand (kW) Minimum (kW):

248

Data:C15dfb3f-bf0f-49c8-a9dd-651f53765236 | Open Energy Information  

Open Energy Info (EERE)

f-bf0f-49c8-a9dd-651f53765236 f-bf0f-49c8-a9dd-651f53765236 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bailey County Elec Coop Assn Effective date: 2012/03/01 End date if known: Rate name: Outdoor Lighting 1000 W MV Sector: Lighting Description: Plus $1.00 per month for each extra pole required Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

249

Data:00bc8d9c-befe-4349-a9d8-4729457e18cd | Open Energy Information  

Open Energy Info (EERE)

d9c-befe-4349-a9d8-4729457e18cd d9c-befe-4349-a9d8-4729457e18cd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Albemarle Electric Member Corp Effective date: 2012/06/01 End date if known: Rate name: Small General Service Non-Demand Sector: Commercial Description: * This schedule is applicable to all non-residential single-phase consumers having load requirements which do not exceed a demand of 50 kW. Single-phase, 60-cycle alternating current, at an available secondary voltage mutually agreed upon between the Cooperative and the consumer. The minimum monthly charge under this schedule shall be the Basic Facilities Charge.

250

Data:8934e49b-6d95-4804-a563-a9f3f3e3da48 | Open Energy Information  

Open Energy Info (EERE)

b-6d95-4804-a563-a9f3f3e3da48 b-6d95-4804-a563-a9f3f3e3da48 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc Effective date: End date if known: Rate name: HPS Security Light Sector: Lighting Description: *Dusk-to-dawn security lighting Source or reference: http://www.fec-co.com/svcmembers.htm#securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2

251

Data:9ccf9a9c-91a5-4942-a999-6e0108705784 | Open Energy Information  

Open Energy Info (EERE)

a9c-91a5-4942-a999-6e0108705784 a9c-91a5-4942-a999-6e0108705784 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Street Lighting Service STL-8 (100W HPS) Sector: Lighting Description: Applicable to municipal or local governmental street lighting service by means of mercury vapor or high pressure sodium lamps. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent: Comments Applicability

252

Data:2a4ccc1f-1fef-48a2-933a-9e591ea927a8 | Open Energy Information  

Open Energy Info (EERE)

ccc1f-1fef-48a2-933a-9e591ea927a8 ccc1f-1fef-48a2-933a-9e591ea927a8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tipton Municipal Electric Util Effective date: 2004/08/13 End date if known: Rate name: Rate F- Street and Highway Lighting: Overhead, 100 Watt Sodium Vapor Sector: Lighting Description: Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

253

Data:52c6ab9b-4a9c-4a78-80c8-aebfb6163b27 | Open Energy Information  

Open Energy Info (EERE)

ab9b-4a9c-4a78-80c8-aebfb6163b27 ab9b-4a9c-4a78-80c8-aebfb6163b27 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Outdoor Security Lighting Service- SL-9 (400W HPS-Flood)- Existing Pole Sector: Lighting Description: Applicable to consumers for dusk to dawn outdoor lighting in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent:

254

Data:Cb3fd5bf-7aba-457b-9f11-e2333cfe73a9 | Open Energy Information  

Open Energy Info (EERE)

fd5bf-7aba-457b-9f11-e2333cfe73a9 fd5bf-7aba-457b-9f11-e2333cfe73a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Gulf States Louisiana LLC Effective date: 2005/09/28 End date if known: Rate name: 2 Large power service (LPS - TOD) - (transmission 230kV voltage) Sector: Industrial Description: This rate is applicable on a voluntary basis under the regular terms and conditions of the company to customers who contract for not less then 2500 kW of electric service at company's available line voltage. Source or reference: www.entergy-louisiana.com/content/price/tariffs/egsi/egsila_lps-tod.pdf

255

Data:0d0825d1-c786-4e37-a06a-9bd9eab3ee78 | Open Energy Information  

Open Energy Info (EERE)

d1-c786-4e37-a06a-9bd9eab3ee78 d1-c786-4e37-a06a-9bd9eab3ee78 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Public Power District Effective date: 2013/01/01 End date if known: Rate name: NON-RESIDENTIAL SERVICE Sector: Commercial Description: Available: At any point within the District's distribution system or a community distribution system operated by the District under a lease agreement. Applicable: For non-residential service where transformer capacity requirements do not exceed 3 kVa, and annual consumption does not exceed 4,000 kWhs annually. Not available for crop irrigation.

256

Data:1bbf1879-c005-41eb-a171-f73a9a0135c7 | Open Energy Information  

Open Energy Info (EERE)

879-c005-41eb-a171-f73a9a0135c7 879-c005-41eb-a171-f73a9a0135c7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stanhope, Iowa (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Commercial rate #12 (referred to as elect-comm-2) Composite Sector: Commercial Description: Source or reference: See IRPS Binder "A" Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

257

Data:B278b711-feff-43d5-8240-65b3a9fe03c7 | Open Energy Information  

Open Energy Info (EERE)

11-feff-43d5-8240-65b3a9fe03c7 11-feff-43d5-8240-65b3a9fe03c7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wake Electric Membership Corp Effective date: 2013/01/01 End date if known: Rate name: Outdoor Lighting Service - Sodium Vapor Units 250 Watt - Shoebox Sector: Lighting Description: Available in all territory served by the Cooperative subject to the established Service Rules and Regulations of the Cooperative. Source or reference: www.wemc.com/documents/RATESCHEDULE2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

258

Data:25345c67-a9d6-430d-ba28-a86c7e1a8ffe | Open Energy Information  

Open Energy Info (EERE)

-a9d6-430d-ba28-a86c7e1a8ffe -a9d6-430d-ba28-a86c7e1a8ffe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Effective date: End date if known: Rate name: Outdoor Lighting Nonmetered Memb Owns/Repairs HPS 100 W Sector: Lighting Description: Source or reference: http://www.consumersenergy.coop/programs.php?pn=Security%20Lights&pl=securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

259

Data:5bc2006d-a831-4c66-a9c0-0667cab1a899 | Open Energy Information  

Open Energy Info (EERE)

bc2006d-a831-4c66-a9c0-0667cab1a899 bc2006d-a831-4c66-a9c0-0667cab1a899 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Commonwealth Edison Co Effective date: 2012/06/20 End date if known: Rate name: BES - Residential Non-Electric Space Heating - Multi Family Sector: Residential Description: * Rider PE (summer & non-summer): https://www.comed.com/Documents/customer-service/rates-pricing/rates-information/current/PurchasedElectricityCharges.pdf Rate Information: https://www.comed.com/Documents/customer-service/rates-pricing/rates-information/current/PurchasedElectricityCharges.pdf and Rate has added to it: Distribution Facilities Charge + Illinois Electricity Distribution charge: https://www.comed.com/Documents/customer-service/rates-pricing/rates-information/current/Delivery_Service_Charges_InfoSheets.pdf

260

Data:0319959a-9ac8-4e99-b765-faaa9877fb54 | Open Energy Information  

Open Energy Info (EERE)

9ac8-4e99-b765-faaa9877fb54 9ac8-4e99-b765-faaa9877fb54 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 7am-7pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Data:8a9dc1ac-bcfe-4c09-b853-c0934cbcbcdd | Open Energy Information  

Open Energy Info (EERE)

dc1ac-bcfe-4c09-b853-c0934cbcbcdd dc1ac-bcfe-4c09-b853-c0934cbcbcdd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jay County Rural E M C Effective date: 2012/02/01 End date if known: Rate name: SCHEDULE A-RESIDENTIAL, FARM AND SMALL COMMERCIAL Sector: Commercial Description: AVAILABILITY Available to any member of the REMC, located on its lines for general residential, farm, and small commercial use up to a metered demand of fifty kilovoltamp (50 KVA). CHARACTER OF SERVICE The type of service rendered under this schedule shall be alternating current, sixty (60) Hertz, single phase at a voltage of approximately 120/240 volts, three wire, or other voltage that might be mutually agreed upon.

262

Data:15e52076-6c7e-4fb2-a9e4-e533649d9a0d | Open Energy Information  

Open Energy Info (EERE)

e52076-6c7e-4fb2-a9e4-e533649d9a0d e52076-6c7e-4fb2-a9e4-e533649d9a0d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2011/09/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 5 Outdoor Lighting Service - NSS Area Light Metal Halide 250W Sector: Lighting Description: APPLICABLE TO THE USE OF SERVICE FOR: Outdoor lighting for residential and general service customers where applicable electric service is available. Flat rate Adjustments = Transition Charge+MFC. Bill Issuance Charge (per bill): $0.73, as described in General Information Section 16.J. and applicable to those customers where charges for this service classification are the only charges that appear on the customer's bill.

263

Data:3a82bdf8-6c05-438a-9bfd-7df9d5a6b154 | Open Energy Information  

Open Energy Info (EERE)

-6c05-438a-9bfd-7df9d5a6b154 -6c05-438a-9bfd-7df9d5a6b154 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Indiana Inc Effective date: 2009/09/14 End date if known: Rate name: AL - 250 watt HPS - Cutoff Sector: Lighting Description: Availability This rate schedule is no longer available after September 1, 2004. Potential lighting customers wanting a lighting system installed and maintained by Company can do so via the Outdoor Lighting Equipment agreement (OLE). Potential customers should contact a Company account representative for further information concerning OLE options. This rate schedule terminates May 1, 2014. Customers currently being provided service under this rate schedule can continue being provided service under this rate schedule until their contract expires or this rate schedule terminates, whichever occurs first.

264

Data:Dc8491b5-e651-44f3-8d41-908580ef3a9d | Open Energy Information  

Open Energy Info (EERE)

b5-e651-44f3-8d41-908580ef3a9d b5-e651-44f3-8d41-908580ef3a9d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2011/09/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 5 Outdoor Lighting Service - NSS Safeguard HPS 940W Sector: Lighting Description: APPLICABLE TO THE USE OF SERVICE FOR: Outdoor lighting for residential and general service customers where applicable electric service is available. Flat rate Adjustments = Transition Charge+MFC. Bill Issuance Charge (per bill): $0.73, as described in General Information Section 16.J. and applicable to those customers where charges for this service classification are the only charges that appear on the customer's bill.

265

Data:2533a5d9-cca2-417a-a9b1-bf3e559ca6a7 | Open Energy Information  

Open Energy Info (EERE)

a5d9-cca2-417a-a9b1-bf3e559ca6a7 a5d9-cca2-417a-a9b1-bf3e559ca6a7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cuivre River Electric Coop Inc Effective date: End date if known: Rate name: General Outdoor Lighting w/ Existing Transformer Sector: Lighting Description: *Dusk-to-dawn Specific type and size of light not specified Source or reference: http://www.cuivreriverelectriccooperative.com.asp1-2.dfw1-1.websitetestlink.com/Commercial/CommercialAccountInformationService/tabid/88/Default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

266

Data:A015c265-9a9d-4143-99f3-f80f1f306fd8 | Open Energy Information  

Open Energy Info (EERE)

A015c265-9a9d-4143-99f3-f80f1f306fd8 A015c265-9a9d-4143-99f3-f80f1f306fd8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coweta-Fayette El Member Corp Effective date: 2007/04/01 End date if known: Rate name: Residential Time-Of-Use Sector: Residential Description: Additional Info: Net Metering: Service to an electric consumer under which electric energy generated by the electric consumer from an eligible on-site generation facility and delivered to the local distribution facilities may be used to offset electric energy provide by the electric utility to the electric consumer during the applicable billing period. For additional information contact the EMC's engineering department.

267

Data:02f0ca7a-c02a-4a9c-b287-aa0df29bcd6c | Open Energy Information  

Open Energy Info (EERE)

ca7a-c02a-4a9c-b287-aa0df29bcd6c ca7a-c02a-4a9c-b287-aa0df29bcd6c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Indiana Inc Effective date: 2009/09/14 End date if known: Rate name: AL - 250 watt HPS - Post Top Sector: Lighting Description: Availability This rate schedule is no longer available after September 1, 2004. Potential lighting customers wanting a lighting system installed and maintained by Company can do so via the Outdoor Lighting Equipment agreement (OLE). Potential customers should contact a Company account representative for further information concerning OLE options. This rate schedule terminates May 1, 2014. Customers currently being provided service under this rate schedule can continue being provided service under this rate schedule until their contract expires or this rate schedule terminates, whichever occurs first.

268

Data:B2900b23-932d-4b4a-9ba5-58f55fa0768b | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:B2900b23-932d-4b4a-9ba5-58f55fa0768b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Cooperative Inc Effective date: 2013/02/01 End date if known: Rate name: Rate Schedule L (MVL) Sector: Lighting Description: The rate schedule is applicable for area and street lighting service to homes, businesses, municipal local and state government bodies, public authorities, residential subdivision of permanent or mobile homes for security lighting and for lighting of streets, highways, parks and similar places.

269

Data:C73c98d8-0578-45e8-8fcf-d2ab843639a9 | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:C73c98d8-0578-45e8-8fcf-d2ab843639a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Swisher Electric Coop, Inc Effective date: 2012/01/01 End date if known: Rate name: Security Lighting Service Unmetered 400MV Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

270

Data:F2ffeba0-dd33-46ba-a9c5-da025768c17d | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:F2ffeba0-dd33-46ba-a9c5-da025768c17d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: UNS Electric, Inc Effective date: 2011/07/01 End date if known: Rate name: C.A.R.E.S - M 1200 kWh - 2000 kWh Sector: Residential Description: This C.A.R.E.S. pricing plan is available to those residential customers presently taking service under the Company's residential service pricing plan whose gross annual income is not more than one hundred fifty percent (150%) of the federal poverty level guideline effective at the time qualification and annual certification is sought.

271

Data:Efbcc6ee-35e1-4a39-b3cf-0d4ec29ef7a9 | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:Efbcc6ee-35e1-4a39-b3cf-0d4ec29ef7a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Weatherford Mun Utility System Effective date: 2012/10/01 End date if known: Rate name: Large General Service - 2 (Demand 200.00 -1000.00) Sector: Industrial Description: $ 3.38 Per KVA Demand Source or reference: http://www.ci.weatherford.tx.us/index.aspx?nid=1150 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

272

Data:Ca7a9ef5-9489-4c95-bfa3-df18cba2c8e4 | Open Energy Information  

Open Energy Info (EERE)

a9ef5-9489-4c95-bfa3-df18cba2c8e4 a9ef5-9489-4c95-bfa3-df18cba2c8e4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co Effective date: 2011/10/01 End date if known: Rate name: Civil Defense - Fire Sirens Sector: Commercial Description: Source or reference: https://www.otpco.com/RatesPricing/Documents/PDF/MN/MN_11.06.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3

273

Data:42c533e8-7354-4e6a-9f5e-f154ab20ffee | Open Energy Information  

Open Energy Info (EERE)

7354-4e6a-9f5e-f154ab20ffee 7354-4e6a-9f5e-f154ab20ffee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Austin Energy Effective date: 2012/10/01 End date if known: Rate name: Customer-Owned, Metered Lighting Sector: Commercial Description: There are additional fees of the Community Benefit Charge and Regulatory Charge of $.00146 per kWh respectively and $0.00316 per kW respectively. Source or reference: http://www.austinenergy.com/About%20Us/Rates/index.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

274

Data:81aaee9c-289f-4511-a9dc-df063dc6a89c | Open Energy Information  

Open Energy Info (EERE)

aaee9c-289f-4511-a9dc-df063dc6a89c aaee9c-289f-4511-a9dc-df063dc6a89c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawley Public Utilities Comm Effective date: 2012/05/01 End date if known: Rate name: MINNKOTA WIND SURCHARGE - RESIDENTIAL Sector: Residential Description: Source or reference: http://www.hawley.govoffice.com/vertical/sites/%7B8CCD72A8-7BD3-4824-833E-37DBC780B17F%7D/uploads/may_2012_rate_sheet.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

275

Data:258fab06-1408-40a9-b166-f618c236b5ad | Open Energy Information  

Open Energy Info (EERE)

fab06-1408-40a9-b166-f618c236b5ad fab06-1408-40a9-b166-f618c236b5ad No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Minnesota Power Inc Effective date: 2011/03/23 End date if known: Rate name: RIDER FOR CITY OF AURORA FRANCHISE FEE Sector: Description: APPLICATION Applicable to bills for retail electric service within the corporate limits of the City of Aurora, except bills for electric service to property owned by the City of Aurora. ADJUSTMENT There shall be added to each customer's monthly electric service bill a City of Aurora Franchise Fee assessment in the amount of: $2.00 per month for each residential electric service meter; and $2.00 per month for each commercial, industrial or other electric service meter. Dual fuel meters shall constitute one meter for purposes of this franchise fee assessment. 100% of the City of Aurora Franchise Fee assessment collected will be passed along to the City of Aurora.

276

Data:18ade5f3-e93c-4924-b557-639d3a9c10a6 | Open Energy Information  

Open Energy Info (EERE)

ade5f3-e93c-4924-b557-639d3a9c10a6 ade5f3-e93c-4924-b557-639d3a9c10a6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: United Electric Coop, Inc Effective date: 2013/07/01 End date if known: Rate name: Schools Sector: Commercial Description: *Available for all schools, subject to the established rules and regulations of the Cooperative. The minimum monthly charge under this rate shall be the higher of a) $1.69 per day; or b) $1.00/kVA of transformer capacity. Source or reference: http://www.ueci.coop/content/rates-charges-0 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

277

Data:A11c4a9c-647d-495c-aa51-8b323b4001bd | Open Energy Information  

Open Energy Info (EERE)

a9c-647d-495c-aa51-8b323b4001bd a9c-647d-495c-aa51-8b323b4001bd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pontotoc Electric Power Assn Effective date: 2013/07/01 End date if known: Rate name: Security Light MV 175 W 40' pole Sector: Lighting Description: Source or reference: http://www.sitemason.com/files/fjDo1q/May%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

278

Data:939255d6-6022-4f8a-9be3-0300f5c821d0 | Open Energy Information  

Open Energy Info (EERE)

255d6-6022-4f8a-9be3-0300f5c821d0 255d6-6022-4f8a-9be3-0300f5c821d0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Vernon Electric Coop Effective date: 2012/05/01 End date if known: Rate name: Peak Alert Rate - Over 50 kW Demand-Primary Metered V2 Sector: Industrial Description: Available for all users requiring more than 50 kVA of connected transformer capacity. All subject to the established rules and regulations of the Cooperative and execution of Electric Service Agreement between the Cooperative and Consumer. Additional Facility Charge over 50 kVA: 50 cents/kVA Seasonal Peak Demand Charge (based on seasonal average demand measured during system-wide peak alerts): Winter $29.00/kW/yr. Summer $63.80/kW/yr. Reactive Demand Charge (at the option of the Cooperative): 25 cents/kVAR/month http://www.vernonelectric.org/content/rates

279

Data:5089e68d-e003-4ae5-8a9f-85480b76b55e | Open Energy Information  

Open Energy Info (EERE)

e68d-e003-4ae5-8a9f-85480b76b55e e68d-e003-4ae5-8a9f-85480b76b55e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Long Island Power Authority Effective date: 2012/03/05 End date if known: Rate name: D581 (Residential Home Heating with Heat Pump) Sector: Residential Description: Applies to customers who heat the entire building solely with an electric resistant heat system, with the exception of fireplaces and coal/wood burning stoves. Hot water is produced by another fuel source. If your account is billed on a discounted Household Assistance Rate, the rate number is preceded by a "D" and the rate description will include "Household Assistance."

280

Data:D226a3bd-0419-4d6c-b3bb-5af5a9fa6cce | Open Energy Information  

Open Energy Info (EERE)

6a3bd-0419-4d6c-b3bb-5af5a9fa6cce 6a3bd-0419-4d6c-b3bb-5af5a9fa6cce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Piedmont Electric Member Corp Effective date: 2007/07/01 End date if known: Rate name: STREET LIGHTING SERVICE 100 Watt (9,500 Lumen) High Pressure Sodium Lamp Sector: Lighting Description: 9,500 Lumen High Pressure Sodium Lamp. Source or reference: http://www.pemc.coop/rateSchedules.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Data:Eb341280-06a9-4b88-ba2e-fbe7ad559330 | Open Energy Information  

Open Energy Info (EERE)

41280-06a9-4b88-ba2e-fbe7ad559330 41280-06a9-4b88-ba2e-fbe7ad559330 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Menard Electric Coop Effective date: 2012/02/01 End date if known: Rate name: Commercial And Power Service With Electric Water Heater Control Rate 61 Sector: Commercial Description: Applicable to members with and installed electric water heater for commercial, public, and industrial for all uses (except service solely for irrigation) requiring one hundred (100) kVA or less of transformer capacity. Members having their residence on the same premises with a service under this schedule may include both on the same meter, in which case, all service will be billed under this rate. The size of individual motors served under this schedule may not exceed ten (10) horsepower without prior permission of the Cooperative. Service is limited to domestic electric water heating with a minimum size 40 gallon water heater. This rate is subject to the Cooperative's Load Management Program.

282

Data:B1d33210-d1ba-4bba-a9c8-495e2151cb0d | Open Energy Information  

Open Energy Info (EERE)

d33210-d1ba-4bba-a9c8-495e2151cb0d d33210-d1ba-4bba-a9c8-495e2151cb0d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kenergy Corp Effective date: 2009/07/17 End date if known: Rate name: Member Rate Stability Mechanism Rider Sector: Description: APPLICABLE In all territory served. MEMBER RATE STABILITY MECHANISM RATE SECTION 1 BILLINGS TO CUSTOMERS SERVED FLOM NON-DEDICATED DELIVERY POINTS Billings computed pursuant to rate schedules to which this section is applicable shall be adjusted based on the following forrnula where all references to costs and revenues will exclude amounts associated with customers served from Dedicated Delivery Points. Billings computed pursuant to rate schedules to which this section is applicable shall be adjusted during each month by the following factor applied to each kilowatt-hour sold: MRSM(m) = (W MRSM - 0 + U) / (P(m) x L)

283

Data:F26095e8-2e52-4a9a-bb85-f800157599ff | Open Energy Information  

Open Energy Info (EERE)

6095e8-2e52-4a9a-bb85-f800157599ff 6095e8-2e52-4a9a-bb85-f800157599ff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Morganton, North Carolina (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Large Commercial Service Sector: Commercial Description: Non Residential Customer/ 150-500 kW Minimum Demand 150 kW Demand Charges: Summer Demand Charge: $20.00/kW Summer Excess Demand: $5.00/kW Non-Summer Demand Charge: $10.50/kW Non-Summer Excess Demand: $8.00/kW Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/212/Morganton%20NC.pdf

284

Data:A189f36f-506f-40e6-8ba4-979a9ecd5150 | Open Energy Information  

Open Energy Info (EERE)

6f-506f-40e6-8ba4-979a9ecd5150 6f-506f-40e6-8ba4-979a9ecd5150 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2006/01/31 End date if known: Rate name: Business Schedule - LAIPS - 16 Sector: Industrial Description: Applicable to electric service up to 200,000 kilowatts for industrial purposes, including lighting and other uses accessory thereto, and for other service for which no specific rate schedule is provided. All service is supplied through one metering installation at one point of delivery. Lighting and incidental service supplied through other meters will be billed at the schedule applicable to such service. Service hereunder is subject to any of the Company's rider schedules that may be applicable. Service under this schedule shall not be resold, sub-metered, used for standby, or shared with others.

285

Data:Ea36d887-929e-44f8-9492-73f9a9a1b00b | Open Energy Information  

Open Energy Info (EERE)

87-929e-44f8-9492-73f9a9a1b00b 87-929e-44f8-9492-73f9a9a1b00b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kiel, Wisconsin (Utility Company) Effective date: 2011/05/06 End date if known: Rate name: Rg-1 Residential Service Single Phase Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0754 per kilowatt-hour.

286

Data:16c12927-1686-4cc5-83a9-58827bff3a72 | Open Energy Information  

Open Energy Info (EERE)

927-1686-4cc5-83a9-58827bff3a72 927-1686-4cc5-83a9-58827bff3a72 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Independence, Missouri (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Public Street Lighting Service - HPSV Lamp Fixture - Contemporary Aluminum Pole - Company Owned - Residential Sector: Lighting Description: To the City of Independence for all Public Street Lighting Service under which the street lighting pole/fixtures were originally installed by the Department prior to May 1, 1999. When (a) existing Mercury Vapor street lighting fixtures are converted to High Pressure Sodium Vapor fixtures or (b) existing Mercury Vapor and High Pressure Sodium Vapor street lighting pole/fixtures are replaced

287

Data:A308a706-e03b-4a43-b7a9-9ea9c2543528 | Open Energy Information  

Open Energy Info (EERE)

A308a706-e03b-4a43-b7a9-9ea9c2543528 A308a706-e03b-4a43-b7a9-9ea9c2543528 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconomowoc Utilities Effective date: 2007/09/01 End date if known: Rate name: Gs-1 General Service Three Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0598 per kilowatt-hour.

288

Data:855ec77a-9cef-4a3c-8a84-4f2558d79769 | Open Energy Information  

Open Energy Info (EERE)

ec77a-9cef-4a3c-8a84-4f2558d79769 ec77a-9cef-4a3c-8a84-4f2558d79769 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cumberland, Wisconsin (Utility Company) Effective date: 2006/03/15 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0294per kilowatt-hour.

289

Data:B93a494b-2dea-4cc9-90a9-62b137acc20b | Open Energy Information  

Open Energy Info (EERE)

a494b-2dea-4cc9-90a9-62b137acc20b a494b-2dea-4cc9-90a9-62b137acc20b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2011/09/01 End date if known: Rate name: Residential Plug-In Electric Vehicle Sector: Residential Description: *The minimum monthly charge shall be the base charge plus $1.00 per kVA of installed transformer capacity in excess of 25 kVA. Source or reference: http://www.sawnee.com/Rate%20Pdfs/pev.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

290

Data:8bb7a5a9-fffc-4a4b-9ef2-f0df45621a5f | Open Energy Information  

Open Energy Info (EERE)

bb7a5a9-fffc-4a4b-9ef2-f0df45621a5f bb7a5a9-fffc-4a4b-9ef2-f0df45621a5f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Industrial General Service Demand Primary Metering/Ownership Sector: Industrial Description: *Applicable to any customer who has demand exceeding 100 kW for three consecutive months. Subject to production cost adjustment and power factor adjustment. Load management credit of $1.40/hp per month (minimum of $5.60 per month) during summer months (June-September) for customers with master metering and city controlled load management.

291

Data:360f26dd-b19c-4faf-a9b7-063b07b3ee7e | Open Energy Information  

Open Energy Info (EERE)

dd-b19c-4faf-a9b7-063b07b3ee7e dd-b19c-4faf-a9b7-063b07b3ee7e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Harmony, Minnesota (Utility Company) Effective date: 2012/06/15 End date if known: Rate name: Municipal Pumping Sector: Commercial Description: Additional Info: Summer June 15th - September 15th of usage Other January 15th - June 15th & September 15th - January 15th of usage Source or reference: http://www.harmony.mn.us/vertical/sites/%7BF58070D9-8755-4E19-AB36-50206B76B06C%7D/uploads/2012_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

292

Data:9030dc9b-29a9-461b-b8c0-cf2d599b7c1c | Open Energy Information  

Open Energy Info (EERE)

b-29a9-461b-b8c0-cf2d599b7c1c b-29a9-461b-b8c0-cf2d599b7c1c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Calhoun, Georgia (Utility Company) Effective date: 2006/07/01 End date if known: Rate name: Security Lights 400 W Utility Type Sector: Lighting Description: Initial charge if a pole must be set for the security light only $150.00. Source or reference: Rate Binder # 2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

293

Data:19d6476c-a9a7-4581-9178-a938582b872d | Open Energy Information  

Open Energy Info (EERE)

76c-a9a7-4581-9178-a938582b872d 76c-a9a7-4581-9178-a938582b872d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule NM Flat Rate Service-801 - 1200 watts(Summer) Sector: Commercial Description: Applicability Applicable to small, constant, non-metered incidental loads for utilities, state agencies, and applicable special districts where the customer owns and maintains the equipment. Such loads would include: ï‚· Cathodic Protection Stations ï‚· Motor Radial Gates ï‚· Pressure Point Automatic Watering Systems ï‚· Traffic Counters ï‚· Flashing Beacons ï‚· Sign Illumination Winter(Dec-May): $ 54.76 per month Summer(Jun-Nov): $ 73.27 per month

294

Data:0741a9e7-31ba-4c33-b16f-066f71d0452c | Open Energy Information  

Open Energy Info (EERE)

a9e7-31ba-4c33-b16f-066f71d0452c a9e7-31ba-4c33-b16f-066f71d0452c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy New Orleans Inc Effective date: 2009/06/01 End date if known: Rate name: Large Electric high load factor LE-HLF-7 Sector: Industrial Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

295

Data:B39e2aa4-a65d-4aac-a338-a9b3fba06e31 | Open Energy Information  

Open Energy Info (EERE)

aa4-a65d-4aac-a338-a9b3fba06e31 aa4-a65d-4aac-a338-a9b3fba06e31 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Butler Public Power District Effective date: 2013/01/01 End date if known: Rate name: Irrigation Services Rate 46 3 day control Sector: Industrial Description: Source or reference: http://www.butlerppd.com/common/New%20Customer%20Packet%20_1.2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

296

Data:Ed3b8e78-f6bb-49fc-85a9-1d7f712481f8 | Open Energy Information  

Open Energy Info (EERE)

b8e78-f6bb-49fc-85a9-1d7f712481f8 b8e78-f6bb-49fc-85a9-1d7f712481f8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Davis Elec Coop, Inc Effective date: 2002/09/04 End date if known: Rate name: High Load Factor Incentive Service Sector: Commercial Description: Service under this Rate Schedule is available throughout the Cooperative's service area in accordance with the Cooperative's established Rules and Regulations for Electric Service. Service Hereunder is limited to Consumers who require an annual peak demand of at least 1,000 kW, and an annual load factor of at least 60%. In order to receive service under this rate, Consumers will be required to sign an electric service contract with a minimum initial term of three (3) years and requiring a minimum of thirty (30) days advance notice to cancel thereafter.

297

Data:92771da8-c1f4-4f42-b02c-d5bfa2a9f4ef | Open Energy Information  

Open Energy Info (EERE)

1da8-c1f4-4f42-b02c-d5bfa2a9f4ef 1da8-c1f4-4f42-b02c-d5bfa2a9f4ef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Atlantic City Electric Co Effective date: 2013/02/01 End date if known: Rate name: SPL Experimental Induction Cobra Head 80 W Sector: Lighting Description: The following rates shall be applied to the kWh Usage for the particular light type and size to determine the monthly charge per light. Source or reference: http://www.atlanticcityelectric.com/_res/documents/NJTariffSectionIV.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

298

Data:1eb9afe6-cb8c-4b8a-9e9b-d0b6ffc97efa | Open Energy Information  

Open Energy Info (EERE)

afe6-cb8c-4b8a-9e9b-d0b6ffc97efa afe6-cb8c-4b8a-9e9b-d0b6ffc97efa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbia River Peoples Ut Dist Effective date: 2011/10/01 End date if known: Rate name: General Service - Unmetered Sector: Commercial Description: To general service Customers with fixed loads with fixed periods of operation, including but not limited to traffic signals and cable television amplifiers, which are unmetered for the convenience and mutual benefit of the Customer and the PUD. BPA Power Cost Adjustment All applicable BPA Power Cost Adjustment charges per Rate Schedule 94 shall apply to all kWh's billed to Customers under this Rate Schedule. Term of Agreement

299

Data:Ad796a92-83a9-41f0-bd33-4d4e79673b0a | Open Energy Information  

Open Energy Info (EERE)

a92-83a9-41f0-bd33-4d4e79673b0a a92-83a9-41f0-bd33-4d4e79673b0a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Imperial Irrigation District Effective date: 1994/01/01 End date if known: Rate name: SCHEDULE SL-2 STATE HIGHWAY LIGHTING SERVICE-HIGH-PRESSURE SODIUM VAPOR 250W Sector: Lighting Description: APPLICABILITY Applicable to service to state highway lighting installations where the customer owns and maintains the equipment and the District furnishes energy at one or more central points in accordance with special conditions set forth herein. Unmetered Service: For each kilowatt of lamp load . . . . . . . $22.30 Minimum charge at any one location . . . . . $ 5.00 Monthly Usage: 100kWh

300

Data:Bd685be9-09e3-4105-8a36-49bc6a9e21df | Open Energy Information  

Open Energy Info (EERE)

be9-09e3-4105-8a36-49bc6a9e21df be9-09e3-4105-8a36-49bc6a9e21df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/07/01 End date if known: Rate name: Roadway Lighting-Mercury vapor-250 watts-Within Corporate Limits Sector: Lighting Description: For the purpose of paying the expenses of conducting and managing the Electric Division, Utilities Department of the City, the City Manager is hereby authorized and directed to charge the following rates for furnishing electric current for outdoor lights, which rates are hereby adopted, for all utility bills issued on and after July 1, 1990

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Data:2b1a500e-ee59-4d69-bffc-a9a1d36b35df | Open Energy Information  

Open Energy Info (EERE)

a500e-ee59-4d69-bffc-a9a1d36b35df a500e-ee59-4d69-bffc-a9a1d36b35df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Todd-Wadena Electric Coop Effective date: 2013/03/01 End date if known: Rate name: Off-Peak Space Heating, Wood Backup Sector: Commercial Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

302

Data:5edc986c-0b11-43cd-a0a9-50a22248b06c | Open Energy Information  

Open Energy Info (EERE)

edc986c-0b11-43cd-a0a9-50a22248b06c edc986c-0b11-43cd-a0a9-50a22248b06c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Leigh, Nebraska (Utility Company) Effective date: 2013/01/15 End date if known: Rate name: Customer Generation Under Standby Concept - Subtransmission line Sector: Industrial Description: To any customer whose requirements are taken at a point or points determined by the District under a contract of standard form, where the customer's total monthly demand load exceeds 20,000 kilowatts and the customer takes delivery on the secondary side of a District Substation on the customer's property. (Not applicable to resale, standby or auxiliary service.)

303

Data:71fa0c1b-06d3-46ba-b53b-779a9a2a3278 | Open Energy Information  

Open Energy Info (EERE)

c1b-06d3-46ba-b53b-779a9a2a3278 c1b-06d3-46ba-b53b-779a9a2a3278 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 2006/03/06 End date if known: Rate name: Private Lighting - North - 175W MV MP - Billed Use Sector: Lighting Description: Source or reference: www.midamericanenergy.com/include/pdf/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

304

Data:Ba236a9a-f6ea-4aff-a805-2fc34404b419 | Open Energy Information  

Open Energy Info (EERE)

36a9a-f6ea-4aff-a805-2fc34404b419 36a9a-f6ea-4aff-a805-2fc34404b419 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Texas-New Mexico Power Co Effective date: 2009/09/01 End date if known: Rate name: Non-Roadway Outdoor Lighting Service (Closed) - Lamp-Flood Light, - 400W, MV Sector: Lighting Description: The service provided pursuant to this Tariff is for any end-use customer for non-roadway outdoor lighting service where existing facilities have adequate capacity and suitable voltage. Lighting service under this schedule applies to non-roadway lighting facilities requested by the Retail Energy Provider (REP) on behalf of a customer connected to Company's distribution system.

305

Data:Cf778b2e-e27d-45a9-9f93-c9d051b05040 | Open Energy Information  

Open Energy Info (EERE)

78b2e-e27d-45a9-9f93-c9d051b05040 78b2e-e27d-45a9-9f93-c9d051b05040 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jacksonville Electric Authority Effective date: 2012/01/01 End date if known: Rate name: GSDT General Service Demand Time of Day Sector: Commercial Description: To any customer where the measured monthly On-Peak billing demand is 75 kW or more four (4) or more months out of twelve consecutive monthly billing periods ending with the current billing period. Also, at the option of the customer, to any customer with demands of less than 75 kW, but more than 49 kW, who agrees to pay for service under this rate schedule for a minimum initial term of twelve months. Resale of energy purchased under this rate schedule is not permitted.

306

Data:4f862efe-a49a-404a-9d57-6f7c32eff00f | Open Energy Information  

Open Energy Info (EERE)

efe-a49a-404a-9d57-6f7c32eff00f efe-a49a-404a-9d57-6f7c32eff00f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City Utilities of Springfield Effective date: 2012/10/01 End date if known: 2013/10/01 Rate name: Large General Power Primary Sector: Description: Service under this rate shall be available within the corporate limits of the City of Springfield, Missouri, and the adjacent territory served by City Utilities for commercial and industrial customers with monthly demands of 300 kilowatts or greater, but less than 1,500 kilowatts. Availability is subject to the General Terms and Conditions Governing Electric Service and the Utility Service Rules and Regulations.

307

Data:F48bdb57-48e4-468a-a9da-42220ed241e9 | Open Energy Information  

Open Energy Info (EERE)

8bdb57-48e4-468a-a9da-42220ed241e9 8bdb57-48e4-468a-a9da-42220ed241e9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Santee Electric Coop, Inc Effective date: 2010/11/01 End date if known: Rate name: Area Lighting Service 100w HPS Enclosed Sector: Lighting Description: This Schedule is available for the leasing of mercury vapor; metal halide and sodium vapor outdoor lighting units to any member/owner served by the Cooperative and subject to established Service Rules and Regulations. Extra charges - Dedicated Poles 30' Wood $2.00 35' Wood $4.00 40' Wood $5.00 45' Wood $6.00 30' to 45' Fiberglass or Metal Pole $16.17

308

Data:2d5c8463-8354-4ca6-a9c1-3fd23615089a | Open Energy Information  

Open Energy Info (EERE)

63-8354-4ca6-a9c1-3fd23615089a 63-8354-4ca6-a9c1-3fd23615089a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Juneau Utility Comm Effective date: 2010/07/15 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 7am-7pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

309

Data:2c0af643-cb03-443e-a9e0-03dfdc42bec2 | Open Energy Information  

Open Energy Info (EERE)

af643-cb03-443e-a9e0-03dfdc42bec2 af643-cb03-443e-a9e0-03dfdc42bec2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Johnson County Rural E M C Effective date: 2010/04/01 End date if known: Rate name: Outdoor Lighting: DECO, Mainstreet, High Pressure Sodium, 150W Sector: Lighting Description: Availability Available to any member of the Corporation entering into a contract for said service where 120 volt service exists for the use of street and security lighting. All lights must exist in a truck accessible location. Maintenance of Lighting System The Corporation will repair and/or replace and maintain all equipment owned by the Corporation, including lamps and glassware, which may be necessary to provide continuous operation of the street and security lighting.

310

Data:0f5dac8f-61a2-4f7c-83a9-ce2d45614c35 | Open Energy Information  

Open Energy Info (EERE)

f5dac8f-61a2-4f7c-83a9-ce2d45614c35 f5dac8f-61a2-4f7c-83a9-ce2d45614c35 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of NM Effective date: 2011/08/21 End date if known: Rate name: 20 Streetlights and Floodlights 7000 Lumen 175 Watt Mercury Vapor Post Top and Streetlight Company Owned Overhead Sector: Lighting Description: Applicable to street lighting and floodlighting systems and under contract with any municipal corporation or other political subdivision within the State of New Mexico. Available within the incorporated limits of cities and towns and adjacent territory served by the Company in its Albuquerque, Valencia, Sandoval, Clayton, Deming, Las Vegas, East Mountain, and Santa Fe Divisions and territory contiguous thereto.

311

Data:E3adfd9b-a9de-4065-b73c-f3a854e87a0f | Open Energy Information  

Open Energy Info (EERE)

adfd9b-a9de-4065-b73c-f3a854e87a0f adfd9b-a9de-4065-b73c-f3a854e87a0f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Emerald People's Utility Dist Effective date: 2012/04/01 End date if known: Rate name: Street Light Decorative Lights 100w Sector: Lighting Description: To service furnished from dusk to dawn for the lighting of public streets, highways, alleys and parks by means of high-pressure sodium street lights installed on Emerald-owned poles. Streetlights will be served by either series or multiple circuits as Emerald may determine. The type and kind of fixtures and supports will be in accordance with Emerald's specifications. Service includes maintenance, energy, lamp, and glassware renewals.

312

Data:F16078c7-09a9-4b67-bc43-9cf3aef61097 | Open Energy Information  

Open Energy Info (EERE)

078c7-09a9-4b67-bc43-9cf3aef61097 078c7-09a9-4b67-bc43-9cf3aef61097 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland Center, Wisconsin (Utility Company) Effective date: 2007/07/09 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0582 per kilowatt-hour.

313

Data:67ec4767-6dbf-4369-bc2e-c4a9c25c1a25 | Open Energy Information  

Open Energy Info (EERE)

6dbf-4369-bc2e-c4a9c25c1a25 6dbf-4369-bc2e-c4a9c25c1a25 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Seattle, Washington (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: SCHEDULE MDS-MEDIUM STANDARD GENERAL SERVICE:SUBURBAN Sector: Commercial Description: SCHEDULE MDS is for standard general service provided to suburban customers whose maximum demand is equal to or greater than 50 kW but less than 1,000 kW. Minimum Charge: 73.00¢ per meter per day (to be implemented when billing system can include it) Discounts: Transformer losses in kWh - 1756 + .53285 x kW + .00002 x kW2+ .00527 x kWh Transformer investment - $0.26 per kW of monthly maximum demand

314

Data:6b826eed-5ae3-43c8-b60d-253a9feb4525 | Open Energy Information  

Open Energy Info (EERE)

26eed-5ae3-43c8-b60d-253a9feb4525 26eed-5ae3-43c8-b60d-253a9feb4525 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Blue Ridge Elec Member Corp Effective date: 2010/03/03 End date if known: Rate name: Industrial Economic Development Textile Sector: Industrial Description: Availability: Available to manufacturing members where the monthly demand averages at least 7,000 kW over the most recent twelve months or the annual energy requirements are at least 55,000,000 kWh. To qualify, the member must be classified as "Textile Mill Products," Code 22, by the Standard Industrial Classification Manual published by the United States Government and more than 50% of the electric energy consumption of such industry is used for its manufacturing processes.

315

Data:58d1cb94-136f-4893-8746-6b3a72a9a41a | Open Energy Information  

Open Energy Info (EERE)

4-136f-4893-8746-6b3a72a9a41a 4-136f-4893-8746-6b3a72a9a41a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Carolina Pub Serv Auth Effective date: 2012/12/01 End date if known: Rate name: Residential Good Cents (New) Sector: Description: (A)Service hereunder is available on a first-come, first-served basis to residential Customers in the retail service area of the Authority in Berkeley, Georgetown, and Horry Counties, South Carolina. Service hereunder shall be available only upon the approval of the Authority. (B) Each Customer shall enter into a service agreement for a minimum original term of one (1) year, except that the Customer may opt to terminate the service agreement up to sixty (60) days afterthe original service agreement date. After the original one year period, the Customer may terminate the service agreement by giving at least sixty (60) days previous notice of such termination in writing. Once the Customer has requested to terminate the service agreement, service under this Schedule will no longer be available to the Customer's premises

316

Data:4eeea96c-66d0-45d2-806b-a9eed6a705a3 | Open Energy Information  

Open Energy Info (EERE)

eeea96c-66d0-45d2-806b-a9eed6a705a3 eeea96c-66d0-45d2-806b-a9eed6a705a3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cumberland, Wisconsin (Utility Company) Effective date: 2006/03/15 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0294per kilowatt-hour.

317

Data:D7b94ba4-9426-468c-96a9-ad1f28b5030e | Open Energy Information  

Open Energy Info (EERE)

ba4-9426-468c-96a9-ad1f28b5030e ba4-9426-468c-96a9-ad1f28b5030e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Interstate Power and Light Co Effective date: 2011/04/11 End date if known: Rate name: Area Lighting Service - 100 Watt HPS and 175 Watt MV Sector: Lighting Description: Available for lighting of outdoor areas from dusk to dawn. Not applicable for lighting of public streets or thoroughfares. A minimum term of service of one year is required for all new installations. A minimum term of service of three years is required for all new installations requiring the placement of dedicated poles. Mercury vapor applications are limited to those fixtures installed on or before December 18, 1990. Replacement or maintenance of existing mercury vapor must be made with sodium vapor lights with equal or better energy efficiency. Service hereunder is also subject to Company's Rules and Regulations.

318

Data:581969f8-1d70-42d2-a9b7-ce8db5bfe5e4 | Open Energy Information  

Open Energy Info (EERE)

69f8-1d70-42d2-a9b7-ce8db5bfe5e4 69f8-1d70-42d2-a9b7-ce8db5bfe5e4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Seattle, Washington (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Schedule MDH-Medium Standard General Service: Shoreline(With Transformer Investment discount) Sector: Residential Description: SCHEDULE MDH is for standard general service provided to City of Shoreline customers whose maximum demand is equal to or greater than 50 kW but less than 1,000 kW. Minimum Charge: 73.00¢ per meter per day (to be implemented when billing system can include it) Discounts: Transformer losses in kWh - 1756 + .53285 x kW + .00002 x kW2+ .00527 x kWh

319

Data:7a687952-a9c0-4f0f-a05b-4f9fb28b91ea | Open Energy Information  

Open Energy Info (EERE)

952-a9c0-4f0f-a05b-4f9fb28b91ea 952-a9c0-4f0f-a05b-4f9fb28b91ea No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Three Notch Elec Member Corp Effective date: 2012/03/01 End date if known: Rate name: 400W Underground Wiring (Non Mercury vapor fixtures) - (Type - 'HPS-Cobra',WoodPole(2)) Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for installation and maintenance.

320

Data:4ac8f866-717f-466b-8aa6-da7e2e4a9f1d | Open Energy Information  

Open Energy Info (EERE)

6-717f-466b-8aa6-da7e2e4a9f1d 6-717f-466b-8aa6-da7e2e4a9f1d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: Monthly Farm Residential and Commercial Single-Phase Rural Service A(2) with heat Sector: Commercial Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Data:Eaae9e26-515a-44cf-9a79-c1eca1cad1a9 | Open Energy Information  

Open Energy Info (EERE)

Eaae9e26-515a-44cf-9a79-c1eca1cad1a9 Eaae9e26-515a-44cf-9a79-c1eca1cad1a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Randolph Electric Member Corp Effective date: 2013/04/01 End date if known: Rate name: GS23TOU - GENERAL SERVICE TIME-OF-USE SERVICE - Single Phase Sector: Industrial Description: * This schedule is available, on a voluntary basis, to all consumers with average monthly load requirements below 500 kW that would otherwise be served under Rate Schedule GS23. If there is an electronic time-of-use meter failure, the consumer's monthly usage may be billed at the GS23 rate. Service under this schedule shall be single-phase commercial or three-phase, 60-hertz, at one of the Cooperative's available voltages. Motors larger than ten horsepower must have approved starting equipment.

322

Data:24e2ee76-d320-49d9-8166-a9b9f56dbab2 | Open Energy Information  

Open Energy Info (EERE)

ee76-d320-49d9-8166-a9b9f56dbab2 ee76-d320-49d9-8166-a9b9f56dbab2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Seattle, Washington (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: SCHEDULE SMS-SMALL GENERAL SERVICE:SUBURN(TRANSFORMER INVESTMENT DISCOUNT) Sector: Commercial Description: SCHEDULE SMS is for small standard general service provided to suburban customers whose maximum demand is less than 50 kW. Discounts: Transformer losses in kWh - 1756 + .53285 x kW + .00002 x kW2+ .00527 x kWh Transformer investment - $0.26 per kW of monthly maximum demand.

323

Data:1daa5b81-96aa-4f0a-9abb-2e254c8cd2ba | Open Energy Information  

Open Energy Info (EERE)

b81-96aa-4f0a-9abb-2e254c8cd2ba b81-96aa-4f0a-9abb-2e254c8cd2ba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Ohio (Utility Company) Effective date: End date if known: Rate name: Street Lighting ornamental, 700w mv(E and M), 30 ft steel pole Sector: Lighting Description: street lighting,ornamental mercury vapor 700 watt(E and M) with maximum 280kwh per lamp. Source or reference: http://www.cpp.org/CPP%20RRR%20ORDINANCE%20as%20of%2011-14-06.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

324

Data:27bf9e2d-97c2-4026-a8d1-39c4a9d90475 | Open Energy Information  

Open Energy Info (EERE)

d-97c2-4026-a8d1-39c4a9d90475 d-97c2-4026-a8d1-39c4a9d90475 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Commercial General Service Demand T.O.U. Primary Metering/Ownership Sector: Commercial Description: *Applicable to any customer who has demand exceeding 100 kW for three consecutive months and has the ability to shed a minimum of 50 kW during seasonal peak demand. Subject to production cost adjustment and power factor adjustment. 3.5% reduction in bill for primary metering and ownership/maintenance of transformation equipment.

325

Data:979ad80f-1845-4f87-837b-d703eb3a9ff2 | Open Energy Information  

Open Energy Info (EERE)

ad80f-1845-4f87-837b-d703eb3a9ff2 ad80f-1845-4f87-837b-d703eb3a9ff2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Clintonville, Wisconsin (Utility Company) Effective date: 2006/05/05 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0680 per kWh. See schedule PCAC.

326

Data:96cc0942-2f53-4a24-815e-c95fff43a9c2 | Open Energy Information  

Open Energy Info (EERE)

cc0942-2f53-4a24-815e-c95fff43a9c2 cc0942-2f53-4a24-815e-c95fff43a9c2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Modesto Irrigation District Effective date: 2013/04/01 End date if known: Rate name: Schedule SL - Lamp and Fixture on Existing Pole - 175 Watt MV Sector: Lighting Description: This section of this Schedule is applicable to all night lighting on the public streets, alleys, highways and parks for cities, lighting districts or other public bodies. Public outdoor area lighting for other than all night lighting is supplied under Rate Schedule GS. Source or reference: www.mid.org/tariffs/rates/SL_STREET_LIGHTING.pdf

327

Data:F0da02b0-3133-43a3-94ef-c6851a9eb75a | Open Energy Information  

Open Energy Info (EERE)

2b0-3133-43a3-94ef-c6851a9eb75a 2b0-3133-43a3-94ef-c6851a9eb75a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/07/01 End date if known: Rate name: Other unmetered services - per KWH times the estimated consumption in KWH per month-Outside Corporate Limits Sector: Commercial Description: For the purpose of paying the expenses of conducting and managing the Electric Division, Utilities Department, of the City, the City Manager is hereby authorized and directed to charge the following rates, for all utility bills issued on and after the dates indicated below. These rates are applicable to service calls, unmetered services, standby power and miscellaneous installations which do not fall under the normal rate schedules, which rates are hereby adopted for all utility bills issued on and after July 1, 1990

328

Data:Fd06660f-ae8a-48de-b7e3-85b7142a9f62 | Open Energy Information  

Open Energy Info (EERE)

0f-ae8a-48de-b7e3-85b7142a9f62 0f-ae8a-48de-b7e3-85b7142a9f62 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Kutztown, Pennsylvania (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: PRIVATE AREA LIGHTING SERVICE 250 W HPS Sector: Lighting Description: Source or reference: http://www.kutztownboro.org/kutztown/uploads/ElectricRatesJanuary2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

329

Data:Ed6e16ac-d634-4b2e-ab25-2f53729689a9 | Open Energy Information  

Open Energy Info (EERE)

e16ac-d634-4b2e-ab25-2f53729689a9 e16ac-d634-4b2e-ab25-2f53729689a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of St Louis, Michigan (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Residential All Electric Service A-4 Sector: Residential Description: This rate is applicable to residential customers with all-electric heating and air conditioning. Source or reference: Rate Binder 3 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

330

Data:Be5fe887-2e8e-4549-8213-0a9cf2df8fa8 | Open Energy Information  

Open Energy Info (EERE)

fe887-2e8e-4549-8213-0a9cf2df8fa8 fe887-2e8e-4549-8213-0a9cf2df8fa8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co Effective date: 2011/10/01 End date if known: Rate name: LARGE GENERAL SERVICE Primary Sector: Commercial Description: Facilities Charge per Month per annual max. kW (minimum 80kW per Month) All kW: $0.12 /kW RULES AND REGULATIONS: Terms and conditions of this electric rate schedule and the General Rules and Regulations govern use of this service. APPLICATION OF SCHEDULE: This schedule is applicable to nonresidential Customers. This schedule is not applicable for outdoor lighting. Emergency and supplementary/Standby service will be supplied only as allowed by law.

331

Data:0e24faca-a0a3-4a9b-9092-d8011e288a25 | Open Energy Information  

Open Energy Info (EERE)

faca-a0a3-4a9b-9092-d8011e288a25 faca-a0a3-4a9b-9092-d8011e288a25 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Choctaw Electric Coop Inc Effective date: 2012/10/21 End date if known: Rate name: Large Power 3 ,Three-Phase Level 3 Sector: Commercial Description: * Available to consumers with installed capacity of 5,000kW of demand per month and taken at primary voltage with a service under term contract. Service will be delivered to one location through one meter.This rate will not be available for service as standby or auxiliary. Subject to only Power Cost Adjustment. Source or reference: Rate binder # 4

332

Data:4b6b91ac-edda-4124-8dfe-7a9f712cedda | Open Energy Information  

Open Energy Info (EERE)

1ac-edda-4124-8dfe-7a9f712cedda 1ac-edda-4124-8dfe-7a9f712cedda No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Lisbon, Wisconsin (Utility Company) Effective date: 2008/05/12 End date if known: Rate name: Rg-1 Residential Service Single Phase with Parallel Generation(20kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0523 per kilowatt-hour.

333

Data:7ea228d0-d149-48d9-93a9-ded0b04415dc | Open Energy Information  

Open Energy Info (EERE)

28d0-d149-48d9-93a9-ded0b04415dc 28d0-d149-48d9-93a9-ded0b04415dc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Wisconsin (Utility Company) Effective date: 2006/02/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0549 per kWh. See schedule PCAC.

334

Data:E0fa0236-5990-48a7-9c7a-9ea36879e168 | Open Energy Information  

Open Energy Info (EERE)

fa0236-5990-48a7-9c7a-9ea36879e168 fa0236-5990-48a7-9c7a-9ea36879e168 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Logan County Coop Power & Light Effective date: 2013/01/01 End date if known: Rate name: FARM AND RESIDENTIAL SERVICE Sector: Residential Description: Available to all farm and residential consumers for all uses subject to the Cooperative's established Rules and Regulations. TYPE OF SERVICE Single-phase, 60 hertz, at the Cooperative's standard secondary voltages. INCLUDED IN FLAT RATE BUY: Generation and Transmission Service Energy Charge All kWh @ $0.05560 per kWh Distribution Service Energy Charge All kWh @ $0.03060 per kWh TOTAL: $0.08620000 per kWh

335

Data:97a106ca-844f-4382-a80a-9cb7d2ace1b2 | Open Energy Information  

Open Energy Info (EERE)

6ca-844f-4382-a80a-9cb7d2ace1b2 6ca-844f-4382-a80a-9cb7d2ace1b2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wheat Belt Public Power Dist Effective date: 2013/01/01 End date if known: Rate name: TRANMISSION HEAVY INDUSTRIAL (E1) Sector: Industrial Description: Applicable for any service, 1000 kVA or greater delivered from the 34.5 kV or higher transmission systems. Source or reference: http://www.wheatbelt.com/index.php?pg=rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

336

Data:4344fec2-1d55-454d-a9b5-898d83c3cf0a | Open Energy Information  

Open Energy Info (EERE)

fec2-1d55-454d-a9b5-898d83c3cf0a fec2-1d55-454d-a9b5-898d83c3cf0a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Statesville, North Carolina (Utility Company) Effective date: 2008/10/02 End date if known: Rate name: Industrial Economic Development Rider Sector: Industrial Description: AVAILABILITY This Rider is available in conjunction with service under the City's Commercial/Industrial Customer Incentive (CI) Rate, the Very Large Industrial Customer Incentive (VI) Rate, or the Coincident Peak (CP-L or CP-VL) Rate Schedules. Customers served under this Rider shall have a monthly peak demand of 500 kW or greater. The availability of credits under this Rider incontingent upon the Customer load meeting the minimum eligibility requirements for service under one of the then-effective Rate schedules listed above.

337

Data:Feace83c-662a-4d44-9a2a-9b03c6319182 | Open Energy Information  

Open Energy Info (EERE)

Feace83c-662a-4d44-9a2a-9b03c6319182 Feace83c-662a-4d44-9a2a-9b03c6319182 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Johnson City, Tennessee (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: GENERAL POWER RATE - GSA 2 (Rate 550) Sector: Commercial Description: GENERAL POWER RATE - GSA 2 (Rate 550) Source or reference: http://www.jcpb.com/yourBusiness/meters/rates.asp#rateSheet Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

338

Data:Aa921ded-9f93-407d-859a-a7a9e727b9ad | Open Energy Information  

Open Energy Info (EERE)

Aa921ded-9f93-407d-859a-a7a9e727b9ad Aa921ded-9f93-407d-859a-a7a9e727b9ad No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shawano Municipal Utilities Effective date: 2007/08/20 End date if known: Rate name: Street Lighting 250w HPS Municipal owned Sector: Lighting Description: Fixture Only $5.00/mo 15 to 16 ft. cast iron, wood or steel... $3.40/month/pole 16ft. aluminum pole ......... $4.50/ month/pole 30ft. fiberglass w/ (1)6` arm ......... $10.50/month/pole 30ft. fiberglass w/ (1) 12` arm ......... $11/month/pole 30ft. fiberglass w/ (2) 12` arm ............ $13/month/pole 30f .steel w/ (1) arm ............ $10/month/pole

339

Data:Ec289169-dbd8-4ddd-982f-5bd0a9e71522 | Open Energy Information  

Open Energy Info (EERE)

89169-dbd8-4ddd-982f-5bd0a9e71522 89169-dbd8-4ddd-982f-5bd0a9e71522 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeast Colorado Power Assn Effective date: 2012/01/01 End date if known: Rate name: General Service - Demand Sector: Commercial Description: Available to services with loads requiring greater than 25 KVA and less than 50 KVA transformer capacity subject to the established rules and regulations of seller. In addition, this tariff is available to all commercial grain storage. (Not available to irrigation). The measured demand shall be the maximum kilowatt demand established by the Consumer for any consecutive 15 minute period during the month for which the bill is rendered, as indicated or recorded by a demand meter.

340

Data:4fdc4ba8-d695-49a9-be60-010ccbae23a7 | Open Energy Information  

Open Energy Info (EERE)

fdc4ba8-d695-49a9-be60-010ccbae23a7 fdc4ba8-d695-49a9-be60-010ccbae23a7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Waverly Municipal Elec Utility Effective date: End date if known: Rate name: General and Minicipal Demand Time of Use Service Sector: Commercial Description: Available to general service and municipal customers with demand requirements over 50 kW occurring four (4) or more months in any twelve (12) month period. This may include industrial customers and commercial customers within the service area for service delivered through one meter at one location for all purposes. Service is subject to applicable terms and conditions of Waverly Light and Power's electric service Rules of Operation.

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Data:88c2117a-9a82-4d7a-b362-fd71f5333f8c | Open Energy Information  

Open Energy Info (EERE)

17a-9a82-4d7a-b362-fd71f5333f8c 17a-9a82-4d7a-b362-fd71f5333f8c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Dalton Utilities Effective date: 2010/01/01 End date if known: Rate name: 150 Watt Sodium Vapor Underground Service Sector: Lighting Description: Post-top type fixture, mounted on 14' tapered aluminum pole with underground wiring. Source or reference: Rate Binder Kelly 2 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

342

Data:A0ff17dc-06a9-4ffb-9ea6-5164d21e84f3 | Open Energy Information  

Open Energy Info (EERE)

ff17dc-06a9-4ffb-9ea6-5164d21e84f3 ff17dc-06a9-4ffb-9ea6-5164d21e84f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Long Island Power Authority Effective date: 2012/03/05 End date if known: Rate name: D580 (Residential Home Heating) Sector: Residential Description: Applies to customers who heat the entire building solely with an electric resistant heat system, with the exception of fireplaces and coal/wood burning stoves. Hot water is produced by another fuel source. If your account is billed on a discounted Household Assistance Rate, the rate number is preceded by a "D" and the rate description will include "Household Assistance."

343

Data:66c4396e-ebb1-44fd-a9a3-461efe884324 | Open Energy Information  

Open Energy Info (EERE)

396e-ebb1-44fd-a9a3-461efe884324 396e-ebb1-44fd-a9a3-461efe884324 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Indiana REMC Effective date: 2010/06/01 End date if known: Rate name: STREET LIGHTING: HPS Shoebox Luminaire, Existing pole, 30' 400W Sector: Lighting Description: Availability Available to any municipal, government agency, commercial account, or homeowners association for street lighting in and around public parking areas, public roads, and vehicle access roads. Applicant must be adjacent to an existing electric power line of the Corporation that is adequate and suitable for supplying the lighting service. Type of Service Dusk-to-dawn lighting service using photoelectric controlled equipment. All equipment, including fixtures, supporting structures and electrical apparatus shall be owned, installed, and maintained by the Corporation. Maintenance of the complete assembly and the cost of its electrical operation are included in this service. Any additional investment required for the extension of secondary service lines or the installation of a transformer, will be billed to the consumer.

344

Data:6311534c-5c06-43a9-b52b-3345ce0c2594 | Open Energy Information  

Open Energy Info (EERE)

1534c-5c06-43a9-b52b-3345ce0c2594 1534c-5c06-43a9-b52b-3345ce0c2594 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mt Wheeler Power, Inc Effective date: 2012/01/10 End date if known: Rate name: Irrigation Rate (Annual Charge) Sector: Commercial Description: The annual charge is based on the highest recorded kilowatt demand from the previous year (or an estimate of the demand from the motor horsepower). The demand is multiplied by 1.34 to come up with the annual horsepower charge. If you have a good payment record, this annual charge may be spread over six months during the year, otherwise a pre-payment may be required.

345

Data:Ed7949a9-c873-4cc0-8259-a73105e47198 | Open Energy Information  

Open Energy Info (EERE)

a9-c873-4cc0-8259-a73105e47198 a9-c873-4cc0-8259-a73105e47198 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lodi, Wisconsin (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand 8am-8pm Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0811 per kilowatt-hour.

346

Data:Faa585a9-8a29-4c76-89a1-ad691a73fc07 | Open Energy Information  

Open Energy Info (EERE)

Faa585a9-8a29-4c76-89a1-ad691a73fc07 Faa585a9-8a29-4c76-89a1-ad691a73fc07 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Sauk City, Wisconsin (Utility Company) Effective date: 2008/08/18 End date if known: Rate name: Rg-1 Residential Service Three Phase with Parallel Generation(20kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0756 per kilowatt-hour.

347

Data:94bb266a-77b0-462b-be1e-9896c2a9a0f7 | Open Energy Information  

Open Energy Info (EERE)

66a-77b0-462b-be1e-9896c2a9a0f7 66a-77b0-462b-be1e-9896c2a9a0f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coldwater Board of Public Util Effective date: 2003/09/19 End date if known: Rate name: Commercial Surge Protection Service Sector: Commercial Description: This rate is available for commercial surge protection to any Coldwater Board of Public Utilities customer with 120/240VAC, 100A - 200A, single-phase service or 208/220/240/277 VAC three-phase service. Subject to approval by the Utility and proper execution of contract. Source or reference: http://www.coldwater.org/Content/Utility_General_Info.html

348

Data:9065f264-b811-4e42-b101-9a9d4aff6831 | Open Energy Information  

Open Energy Info (EERE)

4-b811-4e42-b101-9a9d4aff6831 4-b811-4e42-b101-9a9d4aff6831 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Arcadia, Wisconsin (Utility Company) Effective date: End date if known: Rate name: General Service- Commercial, Instutional, Gevernment, and Farm - Three Phase Sector: Commercial Description: Power Cost Adjustment Clause (PCAC) - All meter rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased and produced. The base cost until changed by order of the Public Service Commission of Wisconsin is $0.0507 per kWh.

349

Data:D7468e64-e961-492a-9ec1-b59f4130dee9 | Open Energy Information  

Open Energy Info (EERE)

e64-e961-492a-9ec1-b59f4130dee9 e64-e961-492a-9ec1-b59f4130dee9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ameren Illinois Company Effective date: 2010/11/19 End date if known: Rate name: DS-2 Zone 2 - Small General Delivery Service 600V or Less Sector: Commercial Description: AVAILABILITY Service under this Rate is available for any eligible Non-Residential Customer within the territory served by Company that meets the following criteria: Customers served under this Rate shall have a maximum monthly Demand of less than 150 kilowatts (kW) as qualified in the Delivery Service Rate Reassignment section. A Customer without a demand meter installed, but with an average usage of less than 1,200 kWh per day during each monthly billing period will be normally assumed to have a maximum monthly Demand of less than 150 kW. Where Customer's average daily usage is 1,200 kWh per day or more in any monthly billing period, Company may install a demand meter at Company's expense to determine if Customer remains eligible for service under this Rate.

350

Data:F579f7eb-ef5a-43a9-a23f-69e1d5a94fdc | Open Energy Information  

Open Energy Info (EERE)

eb-ef5a-43a9-a23f-69e1d5a94fdc eb-ef5a-43a9-a23f-69e1d5a94fdc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: OL "HPS" 70 Watt (Enclosed) (Customer Owned w/o maintenance) 36 kW Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

351

Data:D325bb6c-17ae-4131-b311-a9d717964e4f | Open Energy Information  

Open Energy Info (EERE)

c-17ae-4131-b311-a9d717964e4f c-17ae-4131-b311-a9d717964e4f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Princeton Public Utils Comm Effective date: 2010/02/01 End date if known: Rate name: Small General Service Sector: Commercial Description: Energy Cost Adjustment (ECA)- Each monthly bill shall be adjusted by the difference in the revenues collected and the actual revenue requirements incurred in the previous month. A demand meter shall be installed when a customer's monthly kWh use exceeds 7,500 kWh for 2 consecutive months. If a demand meter is installed, a customer may remain on the Small General Service Rate schedule as long as the customer's maximum demand is less than 25 kW. When a customer's maximum demand is 25 kW or greater for 5 consecutive months the customer will be placed on the Large General Service Rate.

352

Data:D4b3f204-1717-4c9f-aa33-7a9bf112237e | Open Energy Information  

Open Energy Info (EERE)

f204-1717-4c9f-aa33-7a9bf112237e f204-1717-4c9f-aa33-7a9bf112237e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln County Power Dist No 1 Effective date: 2007/07/01 End date if known: Rate name: INDUSTRIAL SERVICE 51 TO 1,000 KVA - URBAN SYSTEM Three Phase Sector: Industrial Description: Applicable to all commercial, industrial, church, governmental and street lighting facilities receiving service from the Lincoln County Power District No. 1's facilities, and which are located within the defined Urban System. The Customer interconnected load must be connected at 51 kVA or greater. Service shall be subject to the established rules and regulations of the Lincoln County Power District No. 1.

353

Data:79c299ff-46ae-4ea0-a968-7a9ff4ea8a12 | Open Energy Information  

Open Energy Info (EERE)

99ff-46ae-4ea0-a968-7a9ff4ea8a12 99ff-46ae-4ea0-a968-7a9ff4ea8a12 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Stratford, Wisconsin (Utility Company) Effective date: 2008/11/18 End date if known: Rate name: Residential- Three- Phase- Time-of-Day- Peak: 8am-8pm Sector: Residential Description: This rate schedule is optional to all Rg-1, Residential Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

354

Data:D0b7fabe-6778-49f0-9a9c-97965057e50b | Open Energy Information  

Open Energy Info (EERE)

b7fabe-6778-49f0-9a9c-97965057e50b b7fabe-6778-49f0-9a9c-97965057e50b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Erwin, Tennessee (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: SCHEDULE LS, (Part B) Mercury Vapor 175W Sector: Lighting Description: Pole $2.00 per month per pole Pole (Metal Halide Light) $4.15 per month per pole Transformer $4.40 per month Source or reference: http://e-u.cc/#/residential/rate-schedules/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

355

Data:61cbf319-e820-4a97-a9ab-2cd9acd762ab | Open Energy Information  

Open Energy Info (EERE)

cbf319-e820-4a97-a9ab-2cd9acd762ab cbf319-e820-4a97-a9ab-2cd9acd762ab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Florence Utility Comm Effective date: 2009/11/30 End date if known: Rate name: Gs-1 General Service Single Phase less than 50kW Demand Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0791 per kilowatt-hour.

356

Data:1da77383-7cb3-4d64-a2a9-289561f91fdd | Open Energy Information  

Open Energy Info (EERE)

da77383-7cb3-4d64-a2a9-289561f91fdd da77383-7cb3-4d64-a2a9-289561f91fdd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hartford Electric Effective date: 2005/07/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 1,000kW Demand Primary Metering Discount (transmission side of transformer) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0452 per kilowatt-hour.

357

Data:022f077a-03c8-41e2-8a9d-35d8820a06bd | Open Energy Information  

Open Energy Info (EERE)

f077a-03c8-41e2-8a9d-35d8820a06bd f077a-03c8-41e2-8a9d-35d8820a06bd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeastern Power Admin Effective date: End date if known: Rate name: Wholesale Power Rate Schedule AP-4-B Sector: Commercial Description: Source or reference: http://199.44.84.82/files/AP-4-B.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

358

Data:Db6d8b00-1dc0-451a-9d46-f23d122811c3 | Open Energy Information  

Open Energy Info (EERE)

d8b00-1dc0-451a-9d46-f23d122811c3 d8b00-1dc0-451a-9d46-f23d122811c3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Juneau Utility Comm Effective date: 2010/07/15 End date if known: Rate name: Gs-1 General Service Single Phase less than 50kW Demand Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

359

Data:98b4efc0-a9f7-4097-8efc-3b4588b4f107 | Open Energy Information  

Open Energy Info (EERE)

efc0-a9f7-4097-8efc-3b4588b4f107 efc0-a9f7-4097-8efc-3b4588b4f107 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2011/08/12 End date if known: Rate name: Ms-1 Street and Yard Lighting Service Ornamental 400 W MH(Double Fixture Facilities-No Outside Cost Contribution) Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

360

Data:225863a7-2abe-47a9-82a2-c154ea60f869 | Open Energy Information  

Open Energy Info (EERE)

a7-2abe-47a9-82a2-c154ea60f869 a7-2abe-47a9-82a2-c154ea60f869 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Rockwood, Tennessee (Utility Company) Effective date: 2012/12/01 End date if known: Rate name: Outdoor Lighting Metal Halide Flood Light 1000w Sector: Lighting Description: ROCKWOOD ELECRIC UTILITY can install a private security light on your residential or commercial property under most conditions. All new requests for outdoor lighting require the applicant to sign a minimum two year contract for security lighting service. If you have security concerns and would like to discuss outdoor lighting options, please contact our Engineering Department to look at the situation with you.

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Data:Ec262e8c-a51a-4cbd-b601-b2b875ef39a9 | Open Energy Information  

Open Energy Info (EERE)

62e8c-a51a-4cbd-b601-b2b875ef39a9 62e8c-a51a-4cbd-b601-b2b875ef39a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Mississippi Elec Pwr Assn Effective date: 2012/12/01 End date if known: Rate name: LIGHTING--SCHEDULE LS--Rate SL 175 watt Mercury Vapor Sector: Lighting Description: Availability A member must be receiving electric service to be eligible for a security light at that location. Character of Service Mercury Vapor, High Pressure Sodium Metal Halide light, or Sodium Edison III controlled by a photoelectric switch so as to provide light from sundown to sunup. Source or reference: ISU Documents

362

Data:144a6938-caa3-4ca2-a9cf-3f587efb99ea | Open Energy Information  

Open Energy Info (EERE)

38-caa3-4ca2-a9cf-3f587efb99ea 38-caa3-4ca2-a9cf-3f587efb99ea No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Yard Lighting HPS 150 W Non-Metered Sector: Lighting Description: *Subject to production cost adjustment. Pole rental for lights/equipment = $1.30 Source or reference: http://www.ci.gothenburg.ne.us/Ordinances/2010_Current/868%20Utility%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

363

Data:4e7cc3a9-04a4-4f6f-bd83-43772403b05f | Open Energy Information  

Open Energy Info (EERE)

e7cc3a9-04a4-4f6f-bd83-43772403b05f e7cc3a9-04a4-4f6f-bd83-43772403b05f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rochester Gas & Electric Corp Effective date: 2013/11/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 8 LARGE GENERAL SERVICE - TIME-OF-USE RATE RSS (Non-Retail) Primary Sector: Industrial Description: APPLICABLE TO USE OF SERVICE FOR: All purposes, in Entire Territory, by any customer with a basic demand of not less than 300 kilowatts during any three of the previous 12 months, provided, however, that whenever the monthly basic demand has been 200 kW or less for 12 consecutive months, the customer thereafter will be billed under another appropriate service classification. Flat rate Adjustments = SBC+RPS+MFC+TCV

364

Data:D0479c61-5f3a-425e-89a9-67caaff8ac32 | Open Energy Information  

Open Energy Info (EERE)

c61-5f3a-425e-89a9-67caaff8ac32 c61-5f3a-425e-89a9-67caaff8ac32 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lyntegar Electric Coop, Inc Effective date: 2010/05/01 End date if known: Rate name: Street Lighting Service "SL" 175 MV Sector: Lighting Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Database%20Now%20Compatible%20with%20Rates/Attachments/48/1%20COOP,%20TX,%20Lyntegar%20Electric%20Cooperative%20Tariff%20For%20Electric%20Service.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

365

Data:52c5ee44-b663-48cb-bd5c-a092a6ac00a9 | Open Energy Information  

Open Energy Info (EERE)

ee44-b663-48cb-bd5c-a092a6ac00a9 ee44-b663-48cb-bd5c-a092a6ac00a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cooperative L&P Assn Lake Cnty Effective date: 2012/01/01 End date if known: Rate name: General Service Sector: Residential Description: Source or reference: http://www.clpower.com/?p=14 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3

366

Data:0bdcbfd8-1bbb-480b-a9b3-ca816ca17d7b | Open Energy Information  

Open Energy Info (EERE)

bdcbfd8-1bbb-480b-a9b3-ca816ca17d7b bdcbfd8-1bbb-480b-a9b3-ca816ca17d7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeast Nebraska P P D Effective date: 2013/01/01 End date if known: Rate name: Annual Single Phase Sector: Commercial Description: AVAILABILITY Available to customers of the District for all farm, stock pumps, equipment, commercial and residential using less than 500 kWh per year. TYPE OF SERVICE Single-phase, 60 cycle, at available voltages. RATE: ANNUAL MINIMUM CHARGES The annual minimum charge under the above rate shall be $275.00 where 25 KVA or less of transformer capacity is required. For consumers requiring more than 25 KVA of transformer capacity, the annual minimum charge shall be increased at the rate of $12.00 for each additional KVA or fraction thereof required. Payment of the annual minimum charge will be made annually in advance of receiving service for self-read/self-bill customers. No kWh's are allowed for the annual minimum charge.

367

Data:Ccb6271f-16d7-48d9-8605-7cb6a9d5eeff | Open Energy Information  

Open Energy Info (EERE)

Ccb6271f-16d7-48d9-8605-7cb6a9d5eeff Ccb6271f-16d7-48d9-8605-7cb6a9d5eeff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Medford, Wisconsin (Utility Company) Effective date: 1997/06/27 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 1,000kW Demand 9am-9pm Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: This rate will be applied to customers for all types of service if their monthly maximum demand is in excess of 1,000kW for 3 months in a consecutive 12-month period. Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0351 per kilowatt-hour.

368

Data:Ea9be25e-8545-4a9f-8e8e-039bd4bfd051 | Open Energy Information  

Open Energy Info (EERE)

be25e-8545-4a9f-8e8e-039bd4bfd051 be25e-8545-4a9f-8e8e-039bd4bfd051 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Licking Rural Electric Inc Effective date: 2011/04/01 End date if known: Rate name: OUTDOOR LIGHTING SERVICE-200 HPS Cobrahead Sector: Lighting Description: Available in all territory served by the Cooperative, in accordance with the Cooperative's Service Rules and Regulations. APPLICABILITY Applicable only to outdoor lighting by means of photoelectric controlled ballast operated vapor lamp fixtures and poles conforming to Cooperative specifications and where service can be provided in close proximity to existing overhead distribution. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for maintenance.

369

Data:7f82ae55-25de-465b-84b1-a9dbf9b21d15 | Open Energy Information  

Open Energy Info (EERE)

ae55-25de-465b-84b1-a9dbf9b21d15 ae55-25de-465b-84b1-a9dbf9b21d15 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Winfield, Kansas (Utility Company) Effective date: 2012/12/01 End date if known: Rate name: Rate schedule LGS-4(70, 75, 78, 79), nonjurisdictional large general service V2 Sector: Industrial Description: Source or reference: http://www.winfieldks.org/index.aspx?NID=201 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

370

Data:Cea4d5ee-26d2-4beb-83ee-d58b710299a9 | Open Energy Information  

Open Energy Info (EERE)

Cea4d5ee-26d2-4beb-83ee-d58b710299a9 Cea4d5ee-26d2-4beb-83ee-d58b710299a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Custer Public Power District Effective date: 2013/01/01 End date if known: Rate name: IRRIGATION - RATE CLASS 33 Sector: Commercial Description: Three Day Control. Notice: Deadline for Irrigation Rate changes is April 1st. Source or reference: http://www.custerpower.com/2013%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

371

Data:2563b7cf-9003-45ed-b55a-f9bb8a49a9fa | Open Energy Information  

Open Energy Info (EERE)

b7cf-9003-45ed-b55a-f9bb8a49a9fa b7cf-9003-45ed-b55a-f9bb8a49a9fa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 1,000kW Demand with Parallel Generation(20 kW or less)-Net Billing Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0765 per kilowatt-hour.

372

Data:85b1706a-9bf5-49e1-bf7c-fff9e05443d5 | Open Energy Information  

Open Energy Info (EERE)

706a-9bf5-49e1-bf7c-fff9e05443d5 706a-9bf5-49e1-bf7c-fff9e05443d5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Loup River Public Power Dist Effective date: 2013/01/15 End date if known: Rate name: Customer Generation Under Buy/Sell Concept - Subtransmission Lines Sector: Industrial Description: To any customer whose requirements are taken at a point or points determined by the District under a contract of standard form, where the customer's total monthly demand load exceeds 20,000 kilowatts and the customer takes delivery on the secondary side of a District Substation on the customer's property. (Not applicable to resale, standby or auxiliary service.)

373

Data:5799bbde-f3a9-4d53-96ac-552ac0d3bad4 | Open Energy Information  

Open Energy Info (EERE)

bbde-f3a9-4d53-96ac-552ac0d3bad4 bbde-f3a9-4d53-96ac-552ac0d3bad4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Secondary Service - Greater than 10 kVa, Non-IDR Metered, less than 400 kVa (TC-MGS) - Muni Discount Rate Sector: Commercial Description: Delivery Service will be single-phase, 60 hertz, at a standard secondary voltage. Delivery Service will be metered using Company's standard watt-hour Meter provided for this type of Delivery Service. Any other metering option(s) will be provided at an additional charge and/or will be provided by a Meter Owner other than the Company pursuant to Applicable Legal Authorities. Where Delivery Service of the type desired is not available at the Point of Delivery, additional charges and special contract arrangements may be required prior to Delivery Service being furnished, pursuant to Section 6.1.2.2, Construction Services, in this Tariff.

374

Data:68ea0599-70d3-4358-a98d-a9b05268d8cd | Open Energy Information  

Open Energy Info (EERE)

599-70d3-4358-a98d-a9b05268d8cd 599-70d3-4358-a98d-a9b05268d8cd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Flint Electric Membership Corp Effective date: 2007/04/01 End date if known: Rate name: Outdoor Lighting NGUS Directional Flood MH 250 W Sector: Lighting Description: If on a leased pole, add a $3.10 monthly charge. POLE CHARGES Type, Charge 30' Wood $205.00 35' Wood $220.00 16' Aluminum (Brushed) $250.00 16' Fiberglass (Black) $300.00 16' Fiberglass (Acorn, Black) $800.00 30' Steel & Sub Base $1325.00 30' Fiberglass with 6' Arm $625.00 30' Fiberglass with 2 - 6' Arm $725.00 Source or reference: http://www.flintenergies.com/myHome/residentialRates/covenantStreetLighting.aspx

375

Data:9caf11a9-2f92-461c-a363-7ef1c75f89ee | Open Energy Information  

Open Energy Info (EERE)

caf11a9-2f92-461c-a363-7ef1c75f89ee caf11a9-2f92-461c-a363-7ef1c75f89ee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hartford Electric Effective date: 2005/07/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 1,000kW Demand Primary Metering (transmission side of transformer) and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0452 per kilowatt-hour.

376

Data:93eeaed2-33a9-4bc1-9a68-2dfe98795366 | Open Energy Information  

Open Energy Info (EERE)

eeaed2-33a9-4bc1-9a68-2dfe98795366 eeaed2-33a9-4bc1-9a68-2dfe98795366 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawaiian Electric Co Inc Effective date: 2012/09/01 End date if known: Rate name: SCHEDULE TOU-R RESIDENTIAL TIME-OF-USE SERVICE - Three Phase Sector: Residential Description: Availability: Applicable to residential power service metered and billed separately by the Company. This Schedule does not apply where a residence and business are combined. Service under this Schedule will be delivered at secondary voltage specified by the Company. Minimum Charge: $22.50 Source or reference: http://www.mauielectric.com/vcmcontent/FileScan/PDF/EnergyServices/Tarrifs/HECO/HECORatesSchTOU-R.pdf

377

Data:8ffc62a9-322b-4520-88c7-59f7a6309634 | Open Energy Information  

Open Energy Info (EERE)

a9-322b-4520-88c7-59f7a6309634 a9-322b-4520-88c7-59f7a6309634 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salt River Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: 100 (Decorative Underground) HPS 48 kWh Outdoor Lighting Sector: Lighting Description: Source or reference: http://psc.ky.gov/tariffs/Electric/Salt%20River%20Electric%20Coop.%20Corp/Tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

378

Data:3fe79d8a-48c0-4a44-ae8b-d9963379a9ac | Open Energy Information  

Open Energy Info (EERE)

9d8a-48c0-4a44-ae8b-d9963379a9ac 9d8a-48c0-4a44-ae8b-d9963379a9ac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Edgecombe-Martin County E M C Effective date: 2006/08/01 End date if known: Rate name: STANDBY SERVICE RIDER RIDER SS-Schedule F Sector: Description: APPLICABILITY: This experimental rider is applicable to the first five members in conjunction with the Cooperative's General Service and Large Power rate schedules for members having another source of electrical power, not held solely for emergency use or peak-shaving purposes, and are requiring the Cooperative to provide standby service. The Cooperative, based upon the capacity of the electrical system in the area, shall determine if standby service is available. Members requesting service under this rider must contract with the Cooperative for the maximum kW that the Cooperative is to supply, not to exceed 1,000 kW. Standby service for greater than 1,000 kW will be handled on an individual basis.

379

Data:5288c1e0-b524-41a9-bb8b-b7168f13914c | Open Energy Information  

Open Energy Info (EERE)

8c1e0-b524-41a9-bb8b-b7168f13914c 8c1e0-b524-41a9-bb8b-b7168f13914c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sulphur Springs Valley E C Inc Effective date: 2013/03/18 End date if known: Rate name: 400 Watt MV - Single/Steel Sector: Lighting Description: Customer provided Facilities and Cooperative Owned and Maintained Lighting Service. Source or reference: http://www.ssvec.org/wp-content/uploads/downloads/2013/03/SSVEC-Rates-03.18.13.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

380

Data:678ce1a9-73c5-4299-aa54-b70f702c53ce | Open Energy Information  

Open Energy Info (EERE)

ce1a9-73c5-4299-aa54-b70f702c53ce ce1a9-73c5-4299-aa54-b70f702c53ce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kankakee Valley Rural E M C Effective date: 2012/05/01 End date if known: Rate name: Rate Schedule LP: Large Power Electric Service Rate Schedule Sector: Industrial Description: AVAILABILITY: This schedule is available to any member of the REMC located within the territory served by Kankakee Valley Rural Electric Membership Corporation that utilizes power on a year-round basis. Customers that use power less than nine months out of the year are served under rate schedules SP, SR, CSP, or SPTOU. APPLICATION: This schedule is applicable to all electric service required for lighting, power, and any other purpose requiring less than 1,000 kVA installed transformer capacity for which no other specific rate schedule is applicable. CHARACTER OF SERVICE: Service under this schedule shall be single phase or three phase, 60 Hertz, alternating current at the REMC's available standard voltages. All service required on the premises by the customer will be supplied through one meter. Standby or resale service is not permitted hereunder.

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Data:4327790d-6eab-44a9-bf8e-220f775e1b64 | Open Energy Information  

Open Energy Info (EERE)

90d-6eab-44a9-bf8e-220f775e1b64 90d-6eab-44a9-bf8e-220f775e1b64 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Johnson County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Large Power Service Sector: Industrial Description: Availability Available to members located on or near the Corporation's multi-phase lines for all types of usage, subject to the established Corporation Service Rules and Regulations. Applicability Applicable to large power consumers who have installed transformer capacity in excess of 101 kVA. Type of Service Single-phase or multi-phase service, 60 hertz at 120/208 or 277/480 volts. New three phase service at 120/240 or 240/480 is not available. Existing 120/240 or 240/480 three phase service as of the effective date of this rate will continue to be served.

382

Data:Dd1e1a9d-dc62-479a-ada5-cd015624c86b | Open Energy Information  

Open Energy Info (EERE)

e1a9d-dc62-479a-ada5-cd015624c86b e1a9d-dc62-479a-ada5-cd015624c86b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeast Nebraska P P D Effective date: 2013/01/01 End date if known: Rate name: LP2 Large Power Service - Sub-Transmission Substation Sector: Industrial Description: 1.1 This Rate Schedule LP-2 is offered for the entire electrical requirements at a single location of any industrial or manufacturing Customer requiring 5,000 kVa or more of installed transformer capacity, and for which there exists an executed power Purchase Contract between the Customer and the District. Resale of energy taken under this rate schedule by the Customer is not permitted.

383

Data:D42a3a9b-0b28-488f-8505-4aca1f336b2c | Open Energy Information  

Open Energy Info (EERE)

a3a9b-0b28-488f-8505-4aca1f336b2c a3a9b-0b28-488f-8505-4aca1f336b2c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Industrial General Service Demand Sector: Industrial Description: *Applicable to any customer who has demand exceeding 100 kW for three consecutive months. Subject to production cost adjustment and power factor adjustment. Load management credit of $1.40/hp per month (minimum of $5.60 per month) during summer months (June-September) for customers with master metering and city controlled load management.

384

Data:5c81857a-f149-458a-a4d2-55a9bc3f1467 | Open Energy Information  

Open Energy Info (EERE)

7a-f149-458a-a4d2-55a9bc3f1467 7a-f149-458a-a4d2-55a9bc3f1467 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lexington, North Carolina (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Small Commercial- All Electric Sector: Commercial Description: Source or reference: http://www.lexingtonnc.net/publicutilities/downloads/Current%20Electric%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

385

Data:4b1c3466-d8a2-42a9-8e8f-78df61d2867d | Open Energy Information  

Open Energy Info (EERE)

66-d8a2-42a9-8e8f-78df61d2867d 66-d8a2-42a9-8e8f-78df61d2867d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lakeland, Florida (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: General Service Demand Trial Period Optional Time-of-Day w/Mid-Peak Period Sector: Commercial Description: To any general service customer whose highest measured 30-minute interval demand has equaled or exceeded 50 kW three or more months and has been less than 500 kW for ten or more months of the twelve (12) most recent monthly billing periods, including the current billing period. Also, at the option of the customer, to customers with demands at any level below 50 kW who agree to pay the "minimum bill" as described below for at least twelve (12) months. All service hereunder will be supplied at one location through one point of delivery and measured through one meter.

386

Data:F5bab6b1-d54d-4474-b720-a9e018f48430 | Open Energy Information  

Open Energy Info (EERE)

b1-d54d-4474-b720-a9e018f48430 b1-d54d-4474-b720-a9e018f48430 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Co Effective date: 2012/06/08 End date if known: Rate name: GP-Educational Institution Service Provision (GEI)-Retail Open Access-Educational Institution Credit for Customer Voltage Level 1 (CVL 1) Sector: Commercial Description: When service is supplied to a school, college or university, a credit shall be applied during all billing months. As used in this provision, "school" shall mean buildings, facilities, playing fields, or property directly or indirectly used for school purposes for children in grades kindergarten through twelve, when provided by a public or nonpublic school. School does not include instruction provided in a private residence or proprietary trade, vocational, training, or occupational school. "College" or "University" shall mean buildings located on the same campus and used to impart instruction, including all adjacent and appurtenant buildings owned by the same customer which are located on the same campus and which constitute an integral part of such college or university facilities.

387

Data:588469d3-5d8a-442d-b11c-7dd07a9e8c05 | Open Energy Information  

Open Energy Info (EERE)

d3-5d8a-442d-b11c-7dd07a9e8c05 d3-5d8a-442d-b11c-7dd07a9e8c05 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: RS - Schedule A-1 - City of Fircrest Sector: Residential Description: Available for domestic purposes in residences, apartments, duplex houses and multiple family dwellings. Source or reference: www.mytpu.org/customer-service/rates/power-rates/power-rates-schedules.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

388

Data:91802fe5-b4c3-47f8-a9c6-a746bbe6255e | Open Energy Information  

Open Energy Info (EERE)

2fe5-b4c3-47f8-a9c6-a746bbe6255e 2fe5-b4c3-47f8-a9c6-a746bbe6255e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lake Mills Light & Water Effective date: 2009/06/01 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0767 per kilowatt-hour.

389

Data:68fe11fa-8d3c-4a9b-9995-365c8b1b4d0f | Open Energy Information  

Open Energy Info (EERE)

fa-8d3c-4a9b-9995-365c8b1b4d0f fa-8d3c-4a9b-9995-365c8b1b4d0f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Seattle, Washington (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: SCHEDULE MDS-MEDIUM STANDARD GENERAL SERVICE:SUBURBAN(TRANSFORMER INVESTMENT DISCOUNT) Sector: Commercial Description: SCHEDULE MDS is for standard general service provided to suburban customers whose maximum demand is equal to or greater than 50 kW but less than 1,000 kW. Minimum Charge: 73.00¢ per meter per day (to be implemented when billing system can include it) Discounts:

390

Data:Dfa2a5b3-f9eb-4eab-944a-9c7590b1b56a | Open Energy Information  

Open Energy Info (EERE)

Dfa2a5b3-f9eb-4eab-944a-9c7590b1b56a Dfa2a5b3-f9eb-4eab-944a-9c7590b1b56a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clarksdale Public Utilities Effective date: 2011/10/01 End date if known: Rate name: Lighting- I1 Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

391

Data:3de64e55-2d08-48a9-a8f1-66830062c4e3 | Open Energy Information  

Open Energy Info (EERE)

4e55-2d08-48a9-a8f1-66830062c4e3 4e55-2d08-48a9-a8f1-66830062c4e3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Brodhead Water & Lighting Comm Effective date: 2010/02/15 End date if known: Rate name: Residential - RG-1 - Three Phase Sector: Residential Description: *POWER COST ADJUSTMENT CLAUSE (PCAC): All metered rates are subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt - hour of sales) is greater or lesser than the base cost of power purchased and produced (per kilowatt - hour of sales). Source or reference: http://www.brodheadlibrary.org/WaterandLightRatesandFees.cfm?Ratetype=Elec

392

Data:3ee41548-4821-40db-a9de-6a36302c3d29 | Open Energy Information  

Open Energy Info (EERE)

1548-4821-40db-a9de-6a36302c3d29 1548-4821-40db-a9de-6a36302c3d29 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: NSTAR Electric Company Effective date: 2012/06/01 End date if known: Rate name: ACUSHNET All Electric School G-6 (22)CLC Sector: Commercial Description: This rate is available only at existing service locations to Customers who were taking service as of February 8, 1980 under an all-electric school rate schedule or under a special contract for all-electric school service. This rate is available for annual service in public and private school buildings where electricity supplies the total energy requirements of the premises served. The design and installation of electrical equipment for space heating, water heating, cooking and other purposes shall be acceptable to the Company. This rate is subject to the Company's printed requirements and the Company's Terms and Conditions - Distribution Service, each as in effect from time to time.

393

Data:Cbe82cd8-a6a4-4342-a9ba-7c73147d3a8e | Open Energy Information  

Open Energy Info (EERE)

cd8-a6a4-4342-a9ba-7c73147d3a8e cd8-a6a4-4342-a9ba-7c73147d3a8e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Kentucky Power Coop, Inc Effective date: 2013/03/10 End date if known: Rate name: Section B Sector: Description: Available to all cooperative associations which are or shall be members of EKPC and which execute EKPC approved contracts with the ultimate consumers, The electric power and energy furnished hereunder shall be separately metered for each point of delivery, Source or reference: http://psc.ky.gov/tariffs/Electric/East%20Kentucky%20Power%20Cooperative,%20Inc/East%20Kentucky%20Power%20Cooperative.pdf

394

Data:Ee55dffb-cbff-474e-95de-55d2286e74a9 | Open Energy Information  

Open Energy Info (EERE)

Ee55dffb-cbff-474e-95de-55d2286e74a9 Ee55dffb-cbff-474e-95de-55d2286e74a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Lansdale, Pennsylvania (Utility Company) Effective date: 2013/01/16 End date if known: Rate name: General Service Sector: Commercial Description: This rate is subject to a Purchase Power Cost Adjustment. Source or reference: http://www.lansdale.org/vertical/Sites/%7B862B0D24-07B5-47AF-8DA9-6A7934A26ACB%7D/uploads/Motion_F_Res._13-02_revise_electric_rates_fees_etc._1.16.13.pdf Source Parent: http://www.lansdale.org Comments Applicability Demand (kW) Minimum (kW):

395

Data:5906d516-222c-4d4b-a23e-42bffbf3a9e8 | Open Energy Information  

Open Energy Info (EERE)

16-222c-4d4b-a23e-42bffbf3a9e8 16-222c-4d4b-a23e-42bffbf3a9e8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otero County Electric Coop Inc Effective date: 2010/03/04 End date if known: Rate name: Residential - Flat Rate Sector: Residential Description: Otero County Electric Cooperative, Inc. (OCEC), with its April 10 billing, will initiate a new program involving Energy Efficiency and rebates on certain items. The new "Energy Efficiency Fund" program will begin with the March 1 kWh usage. The program will be financed by a one percent adder to Members' bills and also by retaining the inspection and supervision fees that were previously paid to the New Mexico Public Regulation Commission (PRC). The OCEC Board of Trustees (Board) approved the basics of the fund at the January Board Meeting and will determine those programs that continue to provide the needed services to our Members.

396

Data:94b71d71-5981-4706-a9e0-6e07c09d291c | Open Energy Information  

Open Energy Info (EERE)

1-5981-4706-a9e0-6e07c09d291c 1-5981-4706-a9e0-6e07c09d291c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Franklin County Effective date: 2008/05/01 End date if known: Rate name: STREET LIGHTING SERVICE RATE SCHEDULE NO. 5 CUSTOMER OWNED 250w HPS Sector: Lighting Description: AVAILABILITY: Service under this schedule shall be available to cities, towns, Franklin County and State of Washington installations located in District's service area upon receipt of an authorized application for lighting under this schedule or under contracts based thereon. APPLICABLE: To the service of lighting systems for public streets, alleys and thoroughfares. Public grounds service existing prior to July 27, 1977, may be provided under this schedule. SPECIFICATIONS: Lighting systems, installed and owned by the District, shall consist of overhead construction with mast arms and luminaries mounted on wood poles. Other types of street lighting systems will be supplied under special contract or other agreement. Customer owned systems will be supplied at voltages and locations approved by the District.

397

Data:F2da6662-d4a8-4f19-b5a9-c2d69c18cadb | Open Energy Information  

Open Energy Info (EERE)

da6662-d4a8-4f19-b5a9-c2d69c18cadb da6662-d4a8-4f19-b5a9-c2d69c18cadb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bartholomew County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Outdoor Security Lighting Service, Mercury Vapor Flood Light, 400W (Existing Wood Pole) Sector: Lighting Description: Availability Available to any consumer of the Corporation where 120-volt service exists ahead of the meter loop for the use of Security Lighting, subject to the Corporation's Service Rules and Regulations. Customers receiving OSL service using a wood pole owned by the customer prior to May 1, 2000 or owned by the Corporation but required for a use other than OSL service shall receive service under the existing wood pole rate. All other customers shall receive service under the new wood pole rate.

398

Data:978f1b5f-3c3d-4e3d-a651-4a9ca2555504 | Open Energy Information  

Open Energy Info (EERE)

b5f-3c3d-4e3d-a651-4a9ca2555504 b5f-3c3d-4e3d-a651-4a9ca2555504 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Monroe County Elec Coop, Inc Effective date: 2013/04/01 End date if known: Rate name: Security Lights(Metered 100 W.H.P Sodium) Sector: Commercial Description: Unmetered automatic Mercury Vapor Lighting and High Pressure Lighting, shall be available to consumers of the cooperative at the following rates and conditions. Source or reference: http://www.mcec.org/Documents/2013%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

399

Data:22463a9c-16d7-4c21-a890-364bccbbc0e4 | Open Energy Information  

Open Energy Info (EERE)

463a9c-16d7-4c21-a890-364bccbbc0e4 463a9c-16d7-4c21-a890-364bccbbc0e4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Diverse Power Incorporated Effective date: 2011/03/19 End date if known: Rate name: Outdoor Lighting HPS 100 W Sector: Lighting Description: Where it is necessary for the company to install additional poles for the exclusive purpose of rendering outdoor lighting service, a charge of $3.00 per month shall be made for each wood pole and $6.00 per month for each metal pole. In lieu of the monthly pole charge, a customer may, at his option, make a non-refundable contribution in aid of construction in the amount of $220 for each wood pole or $650 for each metal pole.

400

Data:Acc674ed-0bd0-4e4a-9f6c-811d78d6ff33 | Open Energy Information  

Open Energy Info (EERE)

Acc674ed-0bd0-4e4a-9f6c-811d78d6ff33 Acc674ed-0bd0-4e4a-9f6c-811d78d6ff33 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: M J M Electric Cooperative Inc Effective date: End date if known: Rate name: C.I.P.S (E. Bartlett K. Schafer L. Muffley) Sector: Commercial Description: C.I.P.S (E. Bartlett K. Schafer L. Muffley) Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Data:71fde4e1-62a9-448e-8651-4ef5de2f8a26 | Open Energy Information  

Open Energy Info (EERE)

fde4e1-62a9-448e-8651-4ef5de2f8a26 fde4e1-62a9-448e-8651-4ef5de2f8a26 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Warroad, Minnesota (Utility Company) Effective date: 2013/03/20 End date if known: 2014/03/20 Rate name: Internal city service rate Sector: Commercial Description: Source or reference: http://mncable.net/~citysupt/RateSchedule.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

402

Data:2f3cbacb-88b1-45c2-abac-02582a38a9a4 | Open Energy Information  

Open Energy Info (EERE)

cbacb-88b1-45c2-abac-02582a38a9a4 cbacb-88b1-45c2-abac-02582a38a9a4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Klickitat County Effective date: 2013/04/01 End date if known: Rate name: Large General Service Sch 3A7 Sector: Commercial Description: For all users who had energy consumption greater than 180,000 kWh during the previous calendar year. For customers normally served by the PUD and supplied through a single meter and one point of delivery. Agriculture irrigation not eligible for this rate. Demand - The billing demand will be the kW as shown by or computed from the readings of the PUD demand meter, for the thirty (30) minute period of the consumer's greatest use during the month.

403

Data:88a88b2d-fbc8-45ea-a9f5-d235ac61d267 | Open Energy Information  

Open Energy Info (EERE)

d-fbc8-45ea-a9f5-d235ac61d267 d-fbc8-45ea-a9f5-d235ac61d267 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kankakee Valley Rural E M C Effective date: 2012/05/01 End date if known: Rate name: Rate Schedule GS: General Service Non-Demand Electric Rate Schedule Sector: Commercial Description: AVAILABILITY: This schedule is available to any member of the REMC located within the territory served by Kankakee Valley Rural Electric Membership Corporation that utilizes power on a year-round basis. Customers that use power less than nine months out of the year are served under rate schedules SP, SR, CSP, or SPTOU. APPLICATION: This schedule is applicable to all single phase farm and small commercial electric service required for lighting, power and any other purpose for which no other specific rate is applicable. CHARACTER OF SERVICE: Service under this schedule shall be single phase, 60 Hertz, alternating current at the REMC's available standard voltages. All electric service required on the premises by the customer will be supplied through one meter. Standby or resale service is not permitted hereunder.

404

Data:Bfe93474-341b-4dbb-a9e5-a8e491683734 | Open Energy Information  

Open Energy Info (EERE)

Bfe93474-341b-4dbb-a9e5-a8e491683734 Bfe93474-341b-4dbb-a9e5-a8e491683734 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Highline Electric Assn Effective date: 2013/01/01 End date if known: Rate name: Irrigation Rates Sector: Commercial Description: Applicable to consumers for the usage at irrigation pumps; subject to the established Rules and Regulations of the Association. Crop drying equipment may be connected to this same service and metered under this same rate schedule provided that: 1. Additional transformer capacity or additional investment by the Association is not required. 2. The drying equipment must not operate at the same time that the irrigation equipment is operating. A double-pole double-throw switch, approved by the Association, must be provided and installed by the consumer in a location that will prevent simultaneous operation.

405

Data:3775b1a9-cb0a-4487-bbdf-c461b085a357 | Open Energy Information  

Open Energy Info (EERE)

a9-cb0a-4487-bbdf-c461b085a357 a9-cb0a-4487-bbdf-c461b085a357 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2001/07/01 End date if known: Rate name: 21 LP-AE-2 Large Power All Electric Sector: Description: Available to non-residential Consumers requiring a transformer capacity of 75 kVA or more, but less than 1,000 kVA, subject to Association's established rules and regulations. This rate applies to electrci service measured by one meter used exclusively by one Consumer in a single establishment on one premise utilizing a single delivery point, and not resold or shared with others. Single phase and or three phase, 60 cycles, at available secondary voltages. Motors having a rated capacity of 10 HP or above must be three phase.

406

Data:7f6a9d63-c258-4ad8-8db1-85e47178bbfe | Open Energy Information  

Open Energy Info (EERE)

a9d63-c258-4ad8-8db1-85e47178bbfe a9d63-c258-4ad8-8db1-85e47178bbfe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Edmond, Oklahoma (Utility Company) Effective date: 2009/09/30 End date if known: Rate name: Additional charges-Extension of Secondary Circuit and Wood Pole-35 Sector: Commercial Description: Source or reference: http://edmondok.com/DocumentCenter/Home/View/442 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

407

Data:21155e69-e7b6-4380-a114-2d0a9a6e57c9 | Open Energy Information  

Open Energy Info (EERE)

5e69-e7b6-4380-a114-2d0a9a6e57c9 5e69-e7b6-4380-a114-2d0a9a6e57c9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Dover, Delaware (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Private Outdoor Lighting: Security Lights, Unmetered, 100 watt HPS Sector: Lighting Description: "Where service is not associated with a metered service, a Customer Charge of $5.00 for residential lights and $10.00 for commercial lights will be added to cover the associated costs of billing and related consumer costs not reflected in the lighting schedule." POLE CHARGES PER MONTH: Poles installed through 2/28/1997: $2.59 monthly charge Poles installed or changed out after 2/28/1997: $4.00 monthly charge

408

Data:2dd6a9ee-8267-4a08-be40-25539b50e1e4 | Open Energy Information  

Open Energy Info (EERE)

dd6a9ee-8267-4a08-be40-25539b50e1e4 dd6a9ee-8267-4a08-be40-25539b50e1e4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Park Electric Coop Inc Effective date: End date if known: Rate name: Residential - Net-Metered - Base #3 Sector: Residential Description: * Service on this schedule is limited to single phase consumers requiring not more than 50 KVA of installed transformer capacity. Park Electric will provide as standard service, up to 200 Amp capacity for the base rate. Over 200 Amp service will be $.50 per KVA in excess of 15 KVA plus the base rate. Line extension minimums under contract will supersede these minimums, if the line extension minimum is higher.

409

Data:714e7301-a4ad-4e58-9ba3-151c70d065a9 | Open Energy Information  

Open Energy Info (EERE)

e7301-a4ad-4e58-9ba3-151c70d065a9 e7301-a4ad-4e58-9ba3-151c70d065a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northcentral Mississippi E P A Effective date: 2011/10/01 End date if known: Rate name: Outdoor Lighting MV 400 W Sector: Lighting Description: *The energy charge in Part A and Part B of this rate schedule shall be increased or decreased in accordance with the current Adjustment Addendum published by TVA. In addition, the energy charge in Part A and Part B of this rate schedule shall be increased or decreased to correspond to increases or decreases determined by TVA under Adjustment 4 of the wholesale power rate schedule applicable under contractual arrangements between TVA and Distributor.

410

Data:512a888f-a9fb-44af-b08a-5274d7222162 | Open Energy Information  

Open Energy Info (EERE)

88f-a9fb-44af-b08a-5274d7222162 88f-a9fb-44af-b08a-5274d7222162 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Princeton, Wisconsin (Utility Company) Effective date: 2006/09/14 End date if known: Rate name: Gs-1 General Service Single Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0524 per kilowatt-hour.

411

Data:74254a94-dc33-4e2d-a9bd-63d8ad46db95 | Open Energy Information  

Open Energy Info (EERE)

4-dc33-4e2d-a9bd-63d8ad46db95 4-dc33-4e2d-a9bd-63d8ad46db95 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of NH Effective date: 2012/01/01 End date if known: Rate name: 70 W HIGH PRESSURE SODIUM LAMP Sector: Lighting Description: Source or reference: http://www.nu.com/PSNHTariffPDFs/tariff070107.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

412

Data:8df9a9c5-d82d-4f34-9ab5-fe42933c4984 | Open Energy Information  

Open Energy Info (EERE)

df9a9c5-d82d-4f34-9ab5-fe42933c4984 df9a9c5-d82d-4f34-9ab5-fe42933c4984 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Carroll County REMC Effective date: 2012/04/01 End date if known: Rate name: RESIDENTIAL ETS RATE SCHEDULE Sector: Residential Description: *THERE IS AN OFF PEAK CHARGE, BUT OFF-PEAK TIMES ARE NOT DEFINED. Facilities Charge $28.00 Energy Charge: All kWh - $0.0917 Off Peak Rider @ $0.0680 per kWh Source or reference: http://www.cwremc.com/index.php?option=com_content&view=article&id=139&Itemid=86 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

413

Data:4935cc6d-80d5-4723-b5ae-08a9d3e47ad1 | Open Energy Information  

Open Energy Info (EERE)

cc6d-80d5-4723-b5ae-08a9d3e47ad1 cc6d-80d5-4723-b5ae-08a9d3e47ad1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kit Carson Electric Coop, Inc Effective date: 2011/09/22 End date if known: Rate name: Optional Time-Of-Use Residential Seasonal Service Sector: Residential Description: Available to all seasonal, residential consumers who require less than 50 kVA transformer capacity within the Utility's service area and who maintain residence in the same premises for less than nine months or more per year. In order to qualify for this rate one of the following applications are required: electric thermal storage, electric base board, electric radiant heating (excluding portable electric heaters), and electric water heating for normal domestic power use to individual residences, individual dwelling units, individual apartments.

414

Data:4bb983c6-834e-44d9-8b4e-27639ebb6a9f | Open Energy Information  

Open Energy Info (EERE)

3c6-834e-44d9-8b4e-27639ebb6a9f 3c6-834e-44d9-8b4e-27639ebb6a9f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Ohio Inc Effective date: 2013/05/06 End date if known: Rate name: Rate NSU - Street Lighting Service For Non-Standard Units - Company Owned on Company Owned Pole - 2,500 Lumen Mercury Vapor Sector: Lighting Description: Applicable for outdoor lighting services on private property with Company owned fixtures in the Company's entire service area where secondary distribution lines are adjacent to the premises to be served. Not applicable for lighting public roadways which are dedicated, or anticipated to be dedicated, except to meet the occasional singular need of a customer who has obtained written approval from the proper governmental authority.

415

Data:2c0ace34-abea-465f-a25a-9e7cc8a8b8fe | Open Energy Information  

Open Energy Info (EERE)

ace34-abea-465f-a25a-9e7cc8a8b8fe ace34-abea-465f-a25a-9e7cc8a8b8fe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Indiana REMC Effective date: 2010/06/01 End date if known: Rate name: STREET LIGHTING: HPS Cobrahead Luminaire(400W)(on existing Pole) Sector: Lighting Description: Availability Available to any municipal, government agency, commercial account, or homeowners association for street lighting in and around public parking areas, public roads, and vehicle access roads. Applicant must be adjacent to an existing electric power line of the Corporation that is adequate and suitable for supplying the lighting service. Type of Service Dusk-to-dawn lighting service using photoelectric controlled equipment. All equipment, including fixtures, supporting structures and electrical apparatus shall be owned, installed, and maintained by the Corporation. Maintenance of the complete assembly and the cost of its electrical operation are included in this service. Any additional investment required for the extension of secondary service lines or the installation of a transformer, will be billed to the consumer.

416

Data:D94017ce-7451-464a-8a19-c2a9d1ddddef | Open Energy Information  

Open Energy Info (EERE)

7451-464a-8a19-c2a9d1ddddef 7451-464a-8a19-c2a9d1ddddef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cornell, Wisconsin (Utility Company) Effective date: 2008/05/12 End date if known: Rate name: Ms-2 Athletic Field Lighting Service 1,500 W Q Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0644 per kilowatt-hour.

417

Data:B9a9b311-e036-4a2a-9138-00e15b9d901b | Open Energy Information  

Open Energy Info (EERE)

a9b311-e036-4a2a-9138-00e15b9d901b a9b311-e036-4a2a-9138-00e15b9d901b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Carteret-Craven El Member Corp Effective date: 2013/01/01 End date if known: Rate name: STREET LIGHTING SERVICE Sodium Vapor 100 W Sector: Lighting Description: 9,500 lumens Lighting units will be furnished by the Cooperative under this Schedule for lighting of outdoor areas from dusk to dawn. Basic service will include installation, maintenance, and operation of lighting units, including electricity for illumination. Basic rates are for the Cooperative's standard street lighting fixtures bracket-mounted on existing distribution system poles. Additional charges will be required for separate street lighting poles, underground service, additional facilities, or other costs incurred to provide service.

418

Data:E7f91462-b2b5-4f6e-915a-9aac2e88ca72 | Open Energy Information  

Open Energy Info (EERE)

62-b2b5-4f6e-915a-9aac2e88ca72 62-b2b5-4f6e-915a-9aac2e88ca72 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Wilton, Iowa (Utility Company) Effective date: 2009/10/01 End date if known: Rate name: Large General Service 2 Sector: Commercial Description: The rate is available to large general service customers as an alternative to the large general service rate schedule. Customers who would qualify for the large general service rate schedule are eligible, at their discretion, to use this large general service schedule. The schedule is available to both single and multiphase customers, 60 cycle service available at secondary voltages. The foregoing rates for each KWH shall be increased by $.011 for each $.010 that the combined cost of fuel and energy purchased per KWH exceeds $.045 per KWH. Adjustments for the cost of fuel and energy purchased shall be made monthly and shall be based upon the average cost of fuel and energy purchased during the preceding month. The fuel and energy cost adjustment base will be $.045 per KWH.

419

Data:Dcc5b707-4980-4d74-af43-9bd4a9e62db8 | Open Energy Information  

Open Energy Info (EERE)

07-4980-4d74-af43-9bd4a9e62db8 07-4980-4d74-af43-9bd4a9e62db8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maui Electric Co Ltd Effective date: 2012/05/04 End date if known: Rate name: Lanai-SCHEDULE "F" Public Street Lighting-100/150/250 Watt High Pressure Sodium Sector: Lighting Description: Availability: Applicable to public street and highway lighting service supplied on the Island of Lanai where the Company owns, maintains and operates the street lighting facilities. Minimum Charge: Fixture charge + $25.00 per month. Source or reference: http://www.mauielectric.com/vcmcontent/FileScan/PDF/EnergyServices/Tarrifs/MECO/LanaiRatesSchF.pdf

420

Data:C0a9a199-0fbd-40db-8d86-988ca43d84c4 | Open Energy Information  

Open Energy Info (EERE)

C0a9a199-0fbd-40db-8d86-988ca43d84c4 C0a9a199-0fbd-40db-8d86-988ca43d84c4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: North Star Electric Coop, Inc Effective date: End date if known: Rate name: Off Peak Sector: Description: * rates are in KVA Source or reference: http://www.northstarelectric.coop/wordpress/wp-content/uploads/2012/04/Rates2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

Note: This page contains sample records for the topic "a9 information gathering" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Data:08db6e4f-5dd3-47cb-be1a-9c74389c230d | Open Energy Information  

Open Energy Info (EERE)

e4f-5dd3-47cb-be1a-9c74389c230d e4f-5dd3-47cb-be1a-9c74389c230d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Carolina Pub Serv Auth Effective date: 2012/12/01 End date if known: Rate name: L-12-SB - LARGE LIGHT AND POWER STANDBY SERVICE RIDER Sector: Industrial Description: Section 1. Availability (A) Service hereunder, "Standby Power", is available to those customers meeting the availability requirements of the Authority's Large Light and Power Rate Schedule L-12 or its successor (hereinafter, "Schedule L"), to which this Rider L-12-SB is attached and made a part of. In addition, service hereunder shall be available only to specified delivery Points upon a prior written agreement between the Authority and the Customer with respect to each such Delivery Point, in the form of an appropriate Delivery Point Specification Sheet attached to the Service Agreement between the Customer and the Authority.

422

Data:95f9d510-bcd9-4f11-9509-d36eeb6a85a9 | Open Energy Information  

Open Energy Info (EERE)

0-bcd9-4f11-9509-d36eeb6a85a9 0-bcd9-4f11-9509-d36eeb6a85a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: High Plains Power Inc Effective date: 2012/01/01 End date if known: Rate name: LARGE POWER THREE PHASE DISTRIBUTION PRIMARY LEVEL SERVICE V2 Sector: Industrial Description: Large Power Three Phase Distribution Primary Level Service Applicable to all members of the Association to the extent that appropriate facilities exist or it is feasible to install them, for three phase general purpose loads in excess of 45kVA of installed transformer capacity. Rates are subject to Power Cost Adjustments and Power Factor Adjustments. A Primary Service Discount of 2% has been applied to these rates.

423

Data:24885d23-d2aa-46b1-a9ee-b6467f456c97 | Open Energy Information  

Open Energy Info (EERE)

-d2aa-46b1-a9ee-b6467f456c97 -d2aa-46b1-a9ee-b6467f456c97 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pacific Gas & Electric Co Effective date: 2012/07/01 End date if known: Rate name: AG-4B 2012 Sector: Commercial Description: Source or reference: http://www.pge.com/nots/rates/tariffs/tm2/pdf/ELEC_SCHEDS_AG-4.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

424

Data:60f889a9-40cc-4a80-b1ca-29bab8929e70 | Open Energy Information  

Open Energy Info (EERE)

a9-40cc-4a80-b1ca-29bab8929e70 a9-40cc-4a80-b1ca-29bab8929e70 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Flint Electric Membership Corp Effective date: 2007/04/01 End date if known: Rate name: Outdoor Lighting NGOS Directional Flood MH 1000 W Sector: Lighting Description: If on a leased pole, add a $3.10 monthly charge. POLE CHARGES Type, Charge 30' Wood $205.00 35' Wood $220.00 16' Aluminum (Brushed) $250.00 16' Fiberglass (Black) $300.00 16' Fiberglass (Acorn, Black) $800.00 30' Steel & Sub Base $1325.00 30' Fiberglass with 6' Arm $625.00 30' Fiberglass with 2 - 6' Arm $725.00 Source or reference: http://www.flintenergies.com/myHome/residentialRates/covenantStreetLighting.aspx

425

Data:D90db295-d521-4128-b0a9-426a123c9d3f | Open Energy Information  

Open Energy Info (EERE)

D90db295-d521-4128-b0a9-426a123c9d3f D90db295-d521-4128-b0a9-426a123c9d3f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Reedsburg Utility Comm Effective date: 2011/06/01 End date if known: Rate name: Cp-1 Small Power Service Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

426

Data:041a3db7-5986-42b7-8e2f-7497b9a9c4b0 | Open Energy Information  

Open Energy Info (EERE)

db7-5986-42b7-8e2f-7497b9a9c4b0 db7-5986-42b7-8e2f-7497b9a9c4b0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Flint Electric Membership Corp Effective date: 2007/04/01 End date if known: Rate name: Outdoor Lighting GUS Shoebox MH 250 W Sector: Lighting Description: POLE CHARGES Type, Charge 30' Wood $205.00 35' Wood $220.00 16' Aluminum (Brushed) $250.00 16' Fiberglass (Black) $300.00 16' Fiberglass (Acorn, Black) $800.00 30' Steel & Sub Base $1325.00 30' Fiberglass with 6' Arm $625.00 30' Fiberglass with 2 - 6' Arm $725.00 Source or reference: http://www.flintenergies.com/myHome/residentialRates/covenantStreetLighting.aspx

427

Data:E980e058-ab13-47ed-a9a4-cac3d64b3d1b | Open Energy Information  

Open Energy Info (EERE)

80e058-ab13-47ed-a9a4-cac3d64b3d1b 80e058-ab13-47ed-a9a4-cac3d64b3d1b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL - Induction 165w Sector: Lighting Description: Applicable to the Colorado Department of Transportation and municipalities for Customer-Owned Lighting Service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

428

Data:C490a6a9-9f7e-4888-9484-26725d43c524 | Open Energy Information  

Open Energy Info (EERE)

a9-9f7e-4888-9484-26725d43c524 a9-9f7e-4888-9484-26725d43c524 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand 8am-8pm Primary Metering and Transformer Ownership Discount (2,300-15,000 volts) with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

429

Data:166ef4ac-a95b-4b0a-a9cc-a84d89909599 | Open Energy Information  

Open Energy Info (EERE)

ef4ac-a95b-4b0a-a9cc-a84d89909599 ef4ac-a95b-4b0a-a9cc-a84d89909599 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2006/01/31 End date if known: Rate name: Business Schedule GS - 1W (Rider UMS-5) (transmission < 230kV voltage) Sector: Commercial Description: This rider is applicable to electric service required by Customers who contract for unmetered electric service under Schedule GS to billboards, unmetered telephone services, telephone booths, railroad signals, cathodic units, traffic cameras or for community antenna systems' pole mounted power supplies, amplifiers, and related incidental equipment, hereinafter referred to as equipment, or other such equipment where metering is not feasible or economical.

430

Data:8de6d3a7-d898-4a9d-ac9f-4cef0394eb69 | Open Energy Information  

Open Energy Info (EERE)

a7-d898-4a9d-ac9f-4cef0394eb69 a7-d898-4a9d-ac9f-4cef0394eb69 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Orange & Rockland Utils Inc Effective date: 2012/04/01 End date if known: Rate name: SC16 Power Bracket Sodium Vapor Overhead and Underground 100w (Customer owned, full service, multiple bills) Sector: Description: APPLICABLE TO USE OF SERVICE FOR: Sales and delivery of electric power supply provided by the Company or delivery of electric power supply provided by an Energy Service Company under the Company's Retail Access Program for outdoor lighting of areas, beyond the limits of public streets, highways or roadways, for use of individuals and private or public organizations where existing distribution facilities are suitable for the service requested.

431

Data:5f350e5e-3052-4d69-8665-c8756bce60a9 | Open Energy Information  

Open Energy Info (EERE)

e5e-3052-4d69-8665-c8756bce60a9 e5e-3052-4d69-8665-c8756bce60a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Flood/Directional Lighting (MH 175w) Sector: Commercial Description: The lighting fixtures served under this rate schedule will be served at standard secondary voltages as determined by Company. This tariff is applicable to any Retail Customer receiving un-metered service for one or more Company approved lighting fixtures which operate automatically every night from dusk to dawn and can be either: (1.) a Customer Owned Fixture or (2.) a Company Owned Fixture. The Company will install, make electrical connection(s), and maintain the lighting fixture(s).

432

Data:691e5131-4f95-4a90-8fb6-252db5c460a9 | Open Energy Information  

Open Energy Info (EERE)

31-4f95-4a90-8fb6-252db5c460a9 31-4f95-4a90-8fb6-252db5c460a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Loup River Public Power Dist Effective date: 2013/01/15 End date if known: Rate name: Directional Floodlighting District Own 400W HPS Sector: Commercial Description: Source or reference: http://www.loup.com/docs/customersvc/LLS-Rates2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

433

Data:497eecf5-51d7-4daa-89ea-b9eb5a676a9f | Open Energy Information  

Open Energy Info (EERE)

eecf5-51d7-4daa-89ea-b9eb5a676a9f eecf5-51d7-4daa-89ea-b9eb5a676a9f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Evansville, Wisconsin (Utility Company) Effective date: 2010/02/01 End date if known: Rate name: Cp-3 TOD Industrial Power Service above 1,000kW Optional Time-of-Day 7am-9pm Primary Metering and Transformer Ownership Discount with Parallel Generation(20 kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0762 per kilowatt-hour.

434

Data:162f025c-f334-4d2a-9a8e-95ab3042ed05 | Open Energy Information  

Open Energy Info (EERE)

162f025c-f334-4d2a-9a8e-95ab3042ed05 162f025c-f334-4d2a-9a8e-95ab3042ed05 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwest Texas Elec Coop, Inc Effective date: End date if known: Rate name: Large Power Service - Primary Service Discount Sector: Description: Fuel Cost Adjustmnet of +/- $0.02-$0.04/kWh Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

435

Data:0af630cd-0e42-407f-9f2e-c348d70a9fb4 | Open Energy Information  

Open Energy Info (EERE)

cd-0e42-407f-9f2e-c348d70a9fb4 cd-0e42-407f-9f2e-c348d70a9fb4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Edmond, Oklahoma (Utility Company) Effective date: 2009/09/30 End date if known: Rate name: Sign & Underpass Lighting Fixtures-25 ft Sector: Lighting Description: Source or reference: http://edmondok.com/DocumentCenter/Home/View/442 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

436

Data:719bd9b4-138c-4659-a9dc-56c7f7037b0e | Open Energy Information  

Open Energy Info (EERE)

bd9b4-138c-4659-a9dc-56c7f7037b0e bd9b4-138c-4659-a9dc-56c7f7037b0e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sacramento Municipal Utility District Effective date: 2011/08/05 End date if known: Rate name: DWS - Distribution Wheeling Service Sector: Description: The District may, at its discretion, provide distribution wheeling service to Independent Power Producers and Cogenerators within SMUD territory, who establish a need for this service. Wheeling service requests will be evaluated on a case by case basis and may be limited by availability of distribution system capacity. This rate has been developed for wholesale power transactions and the District will not wheel non-District power to its retail customers under this rate.

437

Data:8611c349-4c02-46e7-ae2b-6010794a9c3b | Open Energy Information  

Open Energy Info (EERE)

c349-4c02-46e7-ae2b-6010794a9c3b c349-4c02-46e7-ae2b-6010794a9c3b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/07/01 End date if known: Rate name: Industrial (demand charge)- within corporate limits Sector: Industrial Description: tiered demand charge Standby power installation per kilovolt-ampere per month of installed capacity. This charge shall replace any minimum charge in a designated rate schedule Within Corporate Limits is 0.30 ,outside corporate limits is 0.035 Source or reference: http://www.amlegal.com/nxt/gateway.dll/Ohio/painesville_oh/codifiedordinancesofthecityofpainesville?f=templates$fn=default.htm$3.0$vid=amlegal:painesville_oh

438

Data:B3eedb4d-58a9-47df-91df-7e4862dd6200 | Open Energy Information  

Open Energy Info (EERE)

eedb4d-58a9-47df-91df-7e4862dd6200 eedb4d-58a9-47df-91df-7e4862dd6200 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City Utilities of Springfield Effective date: 2012/10/01 End date if known: 2013/10/01 Rate name: Interruptible Power Primary Sector: Description: Service under this rate shall be available within the corporate limits of the City of Springfield, Missouri, and the adjacent territory served by City Utilities for commercial and industrial customers with monthly demands of 1,500 kilowatts or greater. Service under this rate schedule is interruptible and customers must agree to interrupt electric service as provided under special contract with City Utilities. Availability is subject to the General Terms and Conditions Governing Electric Service and the Utility Service Rules