1

Load Management for Industry  

E-Print Network (OSTI)

In the electric utility industry, load management provides the opportunity to control customer loads to beneficially alter a utility's load curve Load management alternatives are covered. Load management methods can be broadly classified into four...

Konsevick, W. J., Jr.

1982-01-01T23:59:59.000Z

2

Load Management Made Simple  

E-Print Network (OSTI)

Company have moved to a demand side or load management mode which seeks to influence customers to change electric usage patterns to more efficiently use available generating capacity. Since 1970, the TUEC system peak demand has more than doubled from about...

Schneider, K.

1985-01-01T23:59:59.000Z

3

Load Management: Opportunity or Calamity?  

E-Print Network (OSTI)

larger now than prior to 1973. Utilities are examining two options which can be termed load management. One option is to control discretionary loads during peak periods. Cycling of residential water heaters or shutting off industrial electric furnaces...

Males, R.; Hassig, N.

1981-01-01T23:59:59.000Z

4

LM158, LM158A, LM258, LM258A LM358, LM358A, LM2904, LM2904V  

E-Print Network (OSTI)

LM158, LM158A, LM258, LM258A LM358, LM358A, LM2904, LM2904V DUAL OPERATIONAL AMPLIFIERS SLOS068R: - Single Supply . . . 3 V to 32 V (26 V for LM2904) - or Dual Supplies . . . +1.5 V to +16 V (+13 V for LM to Maximum-Rated Supply Voltage . . . 32 V (26 V for LM2904) D Open-Loop Differential Voltage Amplification

Ravikumar, B.

5

Demand Response: Load Management Programs  

E-Print Network (OSTI)

CenterPoint Load Management Programs CATEE Conference October, 2012 Agenda Outline I. General Demand Response Definition II. General Demand Response Program Rules III. CenterPoint Commercial Program IV. CenterPoint Residential Programs... V. Residential Discussion Points Demand Response Definition of load management per energy efficiency rule 25.181: ? Load control activities that result in a reduction in peak demand, or a shifting of energy usage from a peak to an off...

Simon, J.

2012-01-01T23:59:59.000Z

6

Peak load management: Potential options  

SciTech Connect

This report reviews options that may be alternatives to transmission construction (ATT) applicable both generally and at specific locations in the service area of the Bonneville Power Administration (BPA). Some of these options have potential as specific alternatives to the Shelton-Fairmount 230-kV Reinforcement Project, which is the focus of this study. A listing of 31 peak load management (PLM) options is included. Estimated costs and normalized hourly load shapes, corresponding to the respective base load and controlled load cases, are considered for 15 of the above options. A summary page is presented for each of these options, grouped with respect to its applicability in the residential, commercial, industrial, and agricultural sectors. The report contains comments on PLM measures for which load shape management characteristics are not yet available. These comments address the potential relevance of the options and the possible difficulty that may be encountered in characterizing their value should be of interest in this investigation. The report also identifies options that could improve the efficiency of the three customer utility distribution systems supplied by the Shelton-Fairmount Reinforcement Project. Potential cogeneration options in the Olympic Peninsula are also discussed. These discussions focus on the options that appear to be most promising on the Olympic Peninsula. Finally, a short list of options is recommended for investigation in the next phase of this study. 9 refs., 24 tabs.

Englin, J.E.; De Steese, J.G.; Schultz, R.W.; Kellogg, M.A.

1989-10-01T23:59:59.000Z

7

Residential Load Management Program and Pilot  

E-Print Network (OSTI)

In 1986 LCRA embarked on residential load management to control peak summer loads. At that time, LCRA was considered a summer peaking utility, and residential air conditioning and water heating systems were selected for control. The program...

Haverlah, D.; Riordon, K.

1994-01-01T23:59:59.000Z

8

Preliminary Evaluation of Load Management for Electricity End Users  

E-Print Network (OSTI)

The planning, design and implementation of load management is complex and expensive. The results of a load management program are subject to numerous uncertainties related to load characteristics, power cost savings, load management costs...

Collier, S. E.

1984-01-01T23:59:59.000Z

9

Load Management DSM: Past, Present & Future  

E-Print Network (OSTI)

Load Management has grown in acceptance over the past several decades as a reliable means to provide a demand-side resource of demand capacity. This paper first reviews the significant break-throughs of load management technology then sets the stage...

Gardner, E.

1994-01-01T23:59:59.000Z

10

LM231A/LM231/LM331A/LM331 Precision Voltage-to-Frequency Converters  

E-Print Network (OSTI)

LM231A/LM231/LM331A/LM331 Precision Voltage-to-Frequency Converters General Description The LM231/LM331 family of voltage-to-frequency converters are ideally suited for use in simple low, the LM231A/LM331A attain a new high level of accuracy versus temperature which could only be at- tained

Lanterman, Aaron

11

Load Shedding in Data Stream Management Systems Using Application Semantics  

Science Journals Connector (OSTI)

Data Stream Management Systems (DSMSs) process highly ... literature, including capacity planning, scheduling, and load shedding. Existing load shedding approaches drop tuples either randomly or based on the char...

Raman Adaikkalavan

2012-01-01T23:59:59.000Z

12

Data Management with Load Balancing in Distributed Computing  

Science Journals Connector (OSTI)

This paper reviews existing data management schemes and presents a design and development of a data management scheme with load balancing in a distributed computing. This scheme defines a variety of degree of load

Jong Sik Lee

2004-01-01T23:59:59.000Z

13

Load Management and Houston Lighting and Power Co.  

E-Print Network (OSTI)

Defining Load Management as influencing of customer loads in order to shift the time use of electric power and energy, encompasses a broad spectrum of activities at Houston Lighting & Power Company. This paper describes those activities by directing...

Drawe, R. G.; Ramsay, I. M.

1984-01-01T23:59:59.000Z

14

LM140/LM340A/LM340/LM7800C Series 3-Terminal Positive Regulators  

E-Print Network (OSTI)

LM140/LM340A/LM340/LM7800C Series 3-Terminal Positive Regulators General Description The LM140/LM340A/LM340/LM7800C monolithic 3-terminal positive voltage regulators employ internal current. The LM340A/LM340/LM7800C series is available in the TO-220 plastic power package, and the LM340

Wedeward, Kevin

15

LOAD SHEDDING IN DATA STREAM MANAGEMENT SYSTEMS  

Science Journals Connector (OSTI)

In this chapter, we focus on a fundamental problem that is central to a DSMS. Namely, we investigate the problem of load shedding during temporary overload periods. This problem... ...

Sharma Chakravarthy; Qingchun Jiang

2009-01-01T23:59:59.000Z

16

Analytical Methods for Implementing Industrial Load Management Programs  

E-Print Network (OSTI)

Many utilities have completed long-term planning studies and have shown that a load management program is cost effective. They are now actively implementing large-scale, system-wide programs such as demand subscription, interruptable rates, and time...

Hassig, N.; Chan, M.; Carlson, R.

1982-01-01T23:59:59.000Z

17

Electrical Energy Conservation and Load Management - An Industrial User's Viewpoint  

E-Print Network (OSTI)

Conservation of electrical energy and load management can reduce industry's electric bills, conserves natural resources and reduces the need for new generating plants. In recent years, industry has implemented extensive conservation programs. Some...

Jackson, C. E.

1984-01-01T23:59:59.000Z

18

Definition: Real-Time Load Measurement And Management | Open Energy  

Open Energy Info (EERE)

Management Management Jump to: navigation, search Dictionary.png Real-Time Load Measurement And Management This function provides real-time measurement of customer consumption and management of load through Advanced Metering Infrastructure (AMI) systems (smart meters, two-way communications) and embedded appliance controllers that help customers make informed energy use decisions via real-time price signals, time-of-use (TOU) rates, and service options.[1] Related Terms advanced metering infrastructure, time-of-use pricing, smart grid References ↑ SmartGrid.gov 'Description of Functions' An in LikeLike UnlikeLike You like this.Sign Up to see what your friends like. line Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Real-Time_Load_Measurement_And_Management&oldid=493115

19

Residential load management: A small town`s experience  

SciTech Connect

This paper describes an integrated residential load management program controlling air conditioning, electric heating, and water heating. The location is Lockhart, Texas, a small city in the central part of the state. A cooperative effort of City management and the wholesale power supplier (the Lower Colorado River Authority (LCRA)) produced a cost-effective, verifiable load management program which benefits the participants, the City, and LCRA. Included are descriptions of the successes and failures in marketing the program to potential participants, discussion of the switch installation and inspection process, and accounts of customer reactions when load management actually began to affect their appliances. The report includes information about customer acceptance and drop-out rates, rebate incentives, and local electrical contractor alliances. And, this report outlines the monitoring system and gives the results of the metering at both the end-use and feeder.

Lewis, C.; Riordon, K.

1995-12-31T23:59:59.000Z

20

Repository Reference Disposal Concepts and Thermal Load Management Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repository Reference Disposal Concepts and Thermal Load Management Repository Reference Disposal Concepts and Thermal Load Management Analysis Repository Reference Disposal Concepts and Thermal Load Management Analysis A disposal concept consists of three parts: waste inventory (7 waste types examined), geologic setting (e.g., clay/shale, salt, crystalline, other sedimentary), and the engineering concept of operations (range of generic operational concepts examined). Two major categories for waste package emplacement modes are identified: 1) "open" where extended ventilation can remove heat for many years following waste emplacement underground; and 2) "enclosed" modes for clay/shale and salt media where waste packages are emplaced in direct or close contact with natural or engineered materials which may have temperature limits that constrain thermal

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Repository Reference Disposal Concepts and Thermal Load Management Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repository Reference Disposal Concepts and Thermal Load Management Repository Reference Disposal Concepts and Thermal Load Management Analysis Repository Reference Disposal Concepts and Thermal Load Management Analysis A disposal concept consists of three parts: waste inventory (7 waste types examined), geologic setting (e.g., clay/shale, salt, crystalline, other sedimentary), and the engineering concept of operations (range of generic operational concepts examined). Two major categories for waste package emplacement modes are identified: 1) "open" where extended ventilation can remove heat for many years following waste emplacement underground; and 2) "enclosed" modes for clay/shale and salt media where waste packages are emplaced in direct or close contact with natural or engineered materials which may have temperature limits that constrain thermal

22

Grid Friendly Appliances – Load-side Solution for Congestion Management  

SciTech Connect

This paper discusses the effectiveness of deploying grid-friendly{trademark} appliances (GFAs) as a load-side solution for congestion management in a competitive electricity market, with the residential house ventilation and air conditioning (HVAC) load used as an example. A GFA is an appliance that can have a sensor and a controller installed to detect price, voltage, or frequency signals and turn on/off according to certain control logic. By using the congestion price as a signal to shift GFA power consumption from high-price periods to low-price periods to reduce load in load pocket areas, transmission line congestion can be successfully mitigated. The magnitude of GFA load reduction and the location of the GFA resources are critical to relieve congestion on targeted lines while not causing other lines to congest. Simulation results are presented and the impact of implementing price-responsive GFAs on the power grid is also studied.

Lu, Ning; Nguyen, Tony B.

2006-05-21T23:59:59.000Z

23

Load Management - An Industrial Perspective on This Developing Technology  

E-Print Network (OSTI)

Load Management is a rapidly developing technology which can have a significant impact on all electric users, especially large users. It is mandated by P.U.R.P.A. (Public Utility Regulatory Policy Act) and is akin to energy conservation but its...

Delgado, R. M.

1983-01-01T23:59:59.000Z

24

2012 CERTS LAAR Program Peer Review - Integration and Extension of Direct Load Management of Smart Loads - Anna Scaglioni, UC Davis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Integration and Extension of Direct Integration and Extension of Direct Load Management of Smart Loads Anna Scaglione, UC Davis GRA: Mahnoosh Alizadeh Project objective  Invent methods to "store" load demand for * Real-time "generation following" * Integration of load reserves as dispatchable assets in the Energy Market  Architecture for virtual "reserves" (queues) of electrical load demand * Watts to Job mapping (analysis)  Captures digitally the service requirements - Equal service type = Equal queue * Job to Watts mapping (synthesis)  Allows to optimally schedule the load profile Major technical accomplishments  Centralized model: Digital Direct Load Scheduling (DDLS) - Year 1-Year 2

25

Utility -Owned Central Plant Load Management at the Domain  

E-Print Network (OSTI)

intensive than ice > Pro – Can use existing chillers > Pro – Can be below ground (dual use of space) > Pro – Can be used for fire fighting or cooling tower backup water source > Con – Larger footprint 7 Thermal Energy Storage (TES) Options ESL-KT-13...Dennis Lilley, CEM, PMP Customer Energy Solutions, Austin Energy Mission: Deliver clean, affordable, reliable energy and excellent customer service. Utility Owned Load Management – Thermal Energy Storage ESL-KT-13-12-12 CATEE 2013: Clean Air...

Lilley, D.

2013-01-01T23:59:59.000Z

26

{Control of Residential Load Management Networks Using Real Time Pricing  

E-Print Network (OSTI)

loads to deliver load following and regulation, withproducts like load following and spinning reserve.following of constant power references. Chapter 7 Implications of Load

Burke, William Jerome

2010-01-01T23:59:59.000Z

27

Benefits and costs of load management: a technical assistance and resource material handbook  

SciTech Connect

This handbook will assist state regulatory authorities and electric utilities in complying with the Load Management Standard of the Public Utility Regulatory Policies Act of 1978. The handbook has two major sections. The first discusses load-management techniques in terms of equipment, customer applications, combinations of techniques, etc. Key steps for evaluating the costs and benefits of load management options also are presented. These steps are intended to sequentially eliminate ineffective load-management options as the cost-benefit calculation becomes more detailed. The second section includes up-to-date information on available load-management technologies, models for utility costing, load-management data transfer, prescreening of load-management options, and the load-management literature.

None

1980-06-01T23:59:59.000Z

28

Who`s in control? Recent (and future) trends in load management  

SciTech Connect

This paper summarizes recent utility experience in load management programs and technologies. In addition to summarizing program and technology information, it offers alternative potential futures for load management in a less-regulated electricity industry. The paper is based on a 1994 study for Hydro-Quebec of 23 leading load management programs around the U.S., focused on direct load control, electric thermal storage, standby generation, commercial load management cooperatives, and experimental interactive load management technologies. Load management programs are among the most popular DSM offerings. According to EPRI`s 1992 load management survey, load management programs (comprising direct load control, thermal storage, and standby generation programs) accounted for 670 of the 2321 programs reported, more than any other program type. Also, 6.4 million customers participated in load management programs, more than took part in all energy efficiency rebate programs combined. Thus while the proliferation of energy efficiency programs has been the most visible trend in DSM since the late 1980s, load management remains the dominant program type.

Prindle, W.R.; Birnbaum, I.L.; Rosenstock, S.J.; King, M.B.

1995-12-31T23:59:59.000Z

29

Utilization of Heat Pump Water Heaters for Load Management  

SciTech Connect

The Energy Conservation Standards for Residential Water Heaters require residential electric storage water heaters with volumes larger than 55 gallons to have an energy factor greater than 2.0 after April 2015. While this standard will significantly increase the energy efficiency of water heaters, large electric storage water heaters that do not use heat pump technologies may no longer be available. Since utilities utilize conventional large-volume electric storage water heaters for thermal storage in demand response programs, there is a concern that the amended standard will significantly limit demand response capacity. To this end, Oak Ridge National Laboratory partnered with the Tennessee Valley Authority to investigate the load management capability of heat pump water heaters that meet or exceed the forthcoming water heater standard. Energy consumption reduction during peak periods was successfully demonstrated, while still meeting other performance criteria. However, to minimize energy consumption, it is important to design load management strategies that consider the home s hourly hot water demand so that the homeowner has sufficient hot water.

Boudreaux, Philip R [ORNL; Jackson, Roderick K [ORNL; Munk, Jeffrey D [ORNL; Gehl, Anthony C [ORNL; Lyne, Christopher T [ORNL

2014-01-01T23:59:59.000Z

30

Simple models of district heating systems for load and demand side management  

E-Print Network (OSTI)

Simple models of district heating systems for load and demand side management and operational heating systems for load and demand side management and operational optimisation Simple modeller and demand side management and operational optimisation © 2004 by the authors, Department of Mechanical

31

Using Control Theory to Guide Load Shedding in Medical Data Stream Management System  

Science Journals Connector (OSTI)

The load shedding problem is vital to a Data Stream Management System (DSMS). This paper ... the design, implementation, and evaluation of a load shedding method under the guide of the ... is not so in a DSMS usi...

Zijing Hu; Hongyan Li; Baojun Qiu…

2005-01-01T23:59:59.000Z

32

Study of load balancing technology for EAST data management  

Science Journals Connector (OSTI)

Abstract With the continuous renewal and increasing number of diagnostics, the EAST tokamak routinely generates ?3 GB of raw data per pulse of the experiment, which is transferred to a centralized data management system. In order to strengthen international cooperation, all the acquired data has been converted and stored in the \\{MDSplus\\} servers. During the data system operation, there are some problems when a lot of client machines connect to a single \\{MDSplus\\} data server. Because the server process keeps the connection until the client closes its connection, a lot of server processes use a lot of network ports and consume a large amount of memory, so that the speed of access to data is very slow, but the CPU resource is not fully utilized. To improve data management system performance, many \\{MDSplus\\} servers will be installed on the blade server and form a server cluster to realize load balancing and high availability by using LVS and heartbeat technology. This paper will describe the details of the design and the test results.

Shi Li; Feng Wang; Bingjia Xiao; Fei Yang; Xiaoyang Sun; Yong Wang

2014-01-01T23:59:59.000Z

33

LM117/LM317A/LM317 3-Terminal Adjustable Regulator  

E-Print Network (OSTI)

LM117/LM317A/LM317 3-Terminal Adjustable Regulator General Description The LM117 series, the LM117 is packaged in standard transistor packages which are easily mounted and handled. In addition to higher performance than fixed regulators, the LM117 series offers full overload protection available only

Jain, Amit

34

Effective Load Management for the City of College Station  

E-Print Network (OSTI)

specifications for a computer controlled system called Supervisory Control and Data Acquisition (SCADA), which will be utilized in automatic system control to achieve maximum pos- sible load reduction during peak load periods. THE TOP TEN COFIIIERCIAL...

Hecox, O. D.; Bauer, V.

1985-01-01T23:59:59.000Z

35

Demand Response Architectures and Load Management Algorithms for Energy-Efficient Power Grids: A Survey  

Science Journals Connector (OSTI)

A power grid has four segments: generation, transmission, distribution and demand. Until now, utilities have been focusing on streamlining their generation, transmission and distribution operations for energy efficiency. While loads have traditionally ... Keywords: Smart grid, energy efficiency, demand-side load management, demand response, load shifting

Yee Wei Law; Tansu Alpcan; Vincent C. S. Lee; Anthony Lo; Slaven Marusic; Marimuthu Palaniswami

2012-11-01T23:59:59.000Z

36

A Dynamic Attribute-Based Load Shedding Scheme for Data Stream Management Systems  

E-Print Network (OSTI)

A Dynamic Attribute-Based Load Shedding Scheme for Data Stream Management Systems Amit Ahuja of tuples, becomes imperative in data stream load shedding, since shedding a complete tuple would lead to shedding informative attribute data along with less-informative attribute data in the tuple. Our load

Ng, Yiu-Kai Dennis

37

Distributed Coordination Schemes for Periodic Loads for Demand Side Management.  

E-Print Network (OSTI)

?? Demand side management (DSM) is a means to improve the energy efficiency, reduce the greenhouse gas emission, the consumers’ cost and the power grid… (more)

Xia, Tian

2011-01-01T23:59:59.000Z

38

A case study review of technical and technology issues for transition of a utility load management program to provide system reliability resources in restructured electricity markets  

E-Print Network (OSTI)

Issues for Transition of a Utility Load Management ProgramSCE’s load management system is to transition from providinga transition from SCE’s current load management system to an

Weller, G.H.

2001-01-01T23:59:59.000Z

39

Partnership with Industries- A Successful "Conservation and Load Management Program"  

E-Print Network (OSTI)

WAS THE EXISTENCE OF FAVORABLE TIME-OF-USE "RATES. THE OPERATIONAL PLANT LOAD IS 10,000 KW. OF THIS, ONE PROCESS WILL REQUIRE 5,000 KW E'OR HEATI NG. THE INITIAL WORK WEEK WILL BE 40 HOURS, AND IS EXPECTED TO INCREASE TO 80 HOURS WITHIN THE NEXT TWO YEARS...P~RTNERSHIPS WITH INDUSTRY '" NT PROGRAM" A SUCCESSFUL "CONSERVATION AND LOAD MANAGEME Walter E. Johnston Carolina power & Light Co. Raleigh, North Carolina INTRODUCTION CAROLINA POWER AND LIGHT PROVIDES ELECTRIC SERVICE TO ABOUT 3 MILLION...

Johnston, W. E.

40

Evaluation of a Local Air Conditioning Duty Cycling Device as a Load Management Tool  

E-Print Network (OSTI)

.25 minutes. This setting allows a maximum reduction of the demand of the condensing unit of 30%. The direct control device is part of a bi-directional power line carrier load management system. It is a three tier system consisting of a central control... lines to the central control computer (CCC). Once a week, the load survey data from the CCC was copied to a tape to be transferred to the Mesquite Data Center for analysis. A heating and cooling load calculation was performed on each house...

Schneider, K.; Thedford, M.

1986-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Control-Based Load Shedding in Data Stream Management Systems Yi-Cheng Tu and Sunil Prabhakar  

E-Print Network (OSTI)

Control-Based Load Shedding in Data Stream Management Systems Yi-Cheng Tu and Sunil Prabhakar system overloading [6, 1]. The idea is to decrease the input load by discarding data tuples from cases of load arrivals. Example 1. As a very typical situation in streams, the incoming data rate may

Tu, Yicheng

42

Commercial and Industrial Conservation and Load Management Programs at New England Electric  

E-Print Network (OSTI)

England Electric has initiated, through its three retail subsidiaries, an ambitious load management and conservation program designed to reduce its projected 1991 summer peak by 230 megawatts and save 335,000 megawatthours per year. The effort... headquartered in Westborough, Massachusetts. Subsidiaries include three retail operating companies -- Massachusetts Electric Company, which serves 850,000 customers in 146 communities; The Narragansett Electric Company, which serves 294,000 customers in 27...

Gibson, P. H.

43

Managing Plug-Loads for Demand Response within Buildings Thomas Weng, Bharathan Balaji, Seemanta Dutta, Rajesh Gupta, Yuvraj Agarwal  

E-Print Network (OSTI)

Managing Plug-Loads for Demand Response within Buildings Thomas Weng, Bharathan Balaji, Seemanta managers can per- form active energy management, especially during demand response situations that require, allowing them to deal with demand response situations through user- specified actuation policies. At its

Gupta, Rajesh

44

Industrial-Load-Shaping: The Practice of and Prospects for Utility/Industry Cooperation to Manage Peak Electricity Demand  

E-Print Network (OSTI)

INDUSTRIAL-LOAD-SHAPI1IG: TIlE PRACTICE OF AND PROSPECTS FOR UTILITY/INDUSTRY COOPERATION TO MAUGE PEAK ELECTRICITY DEMAND Donald J. BuIes and David E. Rubin Consultants, Pacific Gas and Electric Company San Francisco, California Michael F.... Maniates Energy and Resources Group, University of California Berkeley, California ABSTRACT Load-management programs designed to reduce demand for electricity during peak periods are becoming increasingly important to electric utilities. For a gf...

Bules, D. J.; Rubin, D. E.; Maniates, M. F.

45

ControlBased Load Shedding in Data Stream Management Systems YiCheng Tu and Sunil Prabhakar  

E-Print Network (OSTI)

Control­Based Load Shedding in Data Stream Management Systems Yi­Cheng Tu and Sunil Prabhakar}@cs.purdue.edu Abstract Load shedding has been widely used in data stream man­ agement systems (DSMSs) as a means to maintain Quality­ of­Service (QoS) of data processing. However, current sys­ tems tend to adapt ad hoc

Tu, Yicheng

46

Power system operation risk analysis considering charging load self-management of plug-in hybrid electric vehicles  

Science Journals Connector (OSTI)

Abstract Many jurisdictions around the world are supporting the adoption of electric vehicles through incentives and the deployment of a charging infrastructure to reduce greenhouse gas emissions. Plug-in hybrid electric vehicles (PHEVs), with offer mature technology and stable performance, are expected to gain an increasingly larger share of the consumer market. The aggregated effect on power grid due to large-scale penetration of \\{PHEVs\\} needs to be analyzed. Nighttime-charging which typically characterizes \\{PHEVs\\} is helpful in filling the nocturnal load valley, but random charging of large PHEV fleets at night may result in new load peaks and valleys. Active response strategy is a potentially effective solution to mitigate the additional risks brought by the integration of PHEVs. This paper proposes a power system operation risk analysis framework in which charging load self-management is used to control system operation risk. We describe an interactive mechanism between the system and \\{PHEVs\\} in conjunction with a smart charging model is to simulate the time series power consumption of PHEVs. The charging load is managed with adjusting the state transition boundaries and without violating the users’ desired charging constraints. The load curtailment caused by voltage or power flow violation after outages is determined by controlling charging power. At the same time, the system risk is maintained under an acceptable level through charging load self-management. The proposed method is implemented using the Roy Billinton Test System (RBTS) and several PHEV penetration levels are examined. The results show that charging load self-management can effectively balance the extra risk introduced by integration of \\{PHEVs\\} during the charging horizon.

Zhe Liu; Dan Wang; Hongjie Jia; Ned Djilali

2014-01-01T23:59:59.000Z

47

Puget Sound Area Electric Reliability Plan. Appendix D, Conservation, Load Management and Fuel Switching Analysis : Draft Environmental Impact Statement.  

SciTech Connect

Various conservation, load management, and fuel switching programs were considered as ways to reduce or shift system peak load. These programs operate at the end-use level, such as residential water heat. Figure D-1a shows what electricity consumption for water heat looks like on normal and extreme peak days. Load management programs, such as water heat control, are designed to reduce electricity consumption at the time of system peak. On the coldest day in average winter, system load peaks near 8:00 a.m. In a winter with extremely cold weather, electricity consumption increases fr all hours, and the system peak shifts to later in the morning. System load shapes in the Puget Sound area are shown in Figure D-1b for a normal winter peak day (February 2, 1988) and extreme peak day (February 3, 1989). Peak savings from any program are calculated to be the reduction in loads on the entire system at the hour of system peak. Peak savings for all programs are measured at 8:00 a.m. on a normal peak day and 9:00 a.m. on an extreme peak day. On extremely cold day, some water heat load shifts to much later in the morning, with less load available for shedding at the time of system peak. Models of hourly end-use consumption were constructed to simulate the impact of conservation, land management, and fuel switching programs on electricity consumption. Javelin, a time-series simulating package for personal computers, was chosen for the hourly analysis. Both a base case and a program case were simulated. 15 figs., 7 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

48

Load-side Demand Management in Buildings using Controlled Electric Springs  

E-Print Network (OSTI)

The concept of demand-side management for electricand simulation of demand-side management potential in urbanin smart grids, demand side management has been a keen topic

Soni, Jayantika; Krishnanand, KR; Panda, Sanjib

2014-01-01T23:59:59.000Z

49

Active load management with advanced window wall systems: Research and industry perspectives  

SciTech Connect

Advanced window wall systems have the potential to provide demand response by reducing peak electric loads by 20-30% in many commercial buildings through the active control of motorized shading systems, switchable window coatings, operable windows, and ventilated double-skin facade systems. These window strategies involve balancing daylighting and solar heat gains, heat rejection through ventilation, and night-time natural ventilation to achieve space-conditioning and lighting energy use reductions without the negative impacts on occupants associated with other demand responsive (DR) strategies. This paper explores conceptually how advanced window systems fit into the context of active load management programs, which cause customers to directly experience the time-varying costs of their consumption decisions. Technological options are suggested. We present pragmatic criteria that building owners use to determine whether to deploy such strategies. A utility's perspective is given. Industry also provides their perspectives on where the technology is today and what needs to happen to implement such strategies more broadly in the US. While there is significant potential for these advanced window concepts, widespread deployment is unlikely to occur with business-as-usual practice. Technologically, integrated window-lighting-HVAC products are underdeveloped. Implementation is hindered by fragmented labor practices, non-standard communication protocols, and lack of technical expertise. Design tools and information products that quantify energy performance, occupant impacts, reliability, and other pragmatic concerns are not available. Interest within the building industry in sustainability, energy-efficiency, and increased occupant amenity, comfort, and productivity will be the driving factors for these advanced facades in the near term--at least until the dust settles on the deregulated electricity market.

Lee, Eleanor S.; Selkowitz, Stephen E.; Levi, Mark S.; Blanc, Steven L.; McConahey, Erin; McClintock, Maurya; Hakkarainen, Pekka; Sbar, Neil L.; Myser, Michael P.

2002-06-01T23:59:59.000Z

50

Abstract--We consider the management of electric vehicle (EV) loads within a market-based Electric Power System  

E-Print Network (OSTI)

battery charging while engaging in energy and reserve capacity transactions in the wholesale power market day-ahead and real-time power market framework similar to that used in the major USA power pools (PJMAbstract--We consider the management of electric vehicle (EV) loads within a market-based Electric

Caramanis, Michael

51

Distribution Load Modelling for Demand Side Management and End-Use Efficiency  

Science Journals Connector (OSTI)

The problem of electric load modelling for low aggregation levels is addressed in the paper, being the object to obtain good “response” behaviour models of any group of loads in an electric energy distribution...

C. Álvarez; A. Gabaldón

1994-01-01T23:59:59.000Z

52

Demand-side management in smart grid operation considering electric vehicles load shifting and vehicle-to-grid support  

Science Journals Connector (OSTI)

Abstract Demand fluctuation in electric power systems is undesirable from many points of view; this has sparked an interest in demand-side strategies that try to establish mechanisms that allow for a flatter demand curve. Particularly interesting is load shifting, a strategy that considers the shifting of certain amounts of energy demand from some time periods to other time periods with lower expected demand, typically in response to price signals. In this paper, an optimization-based model is proposed to perform load shifting in the context of smart grids. In our model, we define agents that are responsible for load, generation and storage management; in particular, some of them are electric vehicle aggregators. An important feature of the proposed approach is the inclusion of electric vehicles with vehicle-to-grid capabilities; with this possibility, electric vehicles can provide certain services to the power grid, including load shifting and congestion management. Results are reported for a test system based on the IEEE 37-bus distribution grid; the effectiveness of the approach and the effect of the hourly energy prices on flattening the load curve are shown.

M.A. López; S. de la Torre; S. Martín; J.A. Aguado

2015-01-01T23:59:59.000Z

53

Advanced Load Identification and Management for Buildings: Cooperative Research and Development Final Report, CRADA Number: CRD-11-422  

SciTech Connect

The goal of this CRADA work is to support Eaton Innovation Center (Eaton) efforts to develop advanced load identification, management technologies, and solutions to reduce building energy consumption by providing fine granular visibility of energy usage information and safety protection of miscellaneous electric loads (MELs) in commercial and residential buildings. MELs load identification and prediction technology will be employed in a novel 'Smart eOutlet*' to provide critical intelligence and information to improve the capability and functionality of building load analysis and design tools and building power management systems. The work scoped in this CRADA involves the following activities: development and validation of business value proposition for the proposed technologies through voice of customer investigation, market analysis, and third-party objective assessment; development and validation of energy saving impact as well as assessment of environmental and economic benefits; 'smart eOutlet' concept design, prototyping, and validation; field validation of the developed technologies in real building environments. (*Another name denoted as 'Smart Power Strip (SPS)' will be used as an alternative of the name 'Smart eOutlet' for a clearer definition of the product market position in future work.)

Gentile-Polese, L.

2014-05-01T23:59:59.000Z

54

Information technology and innovative drainage management practices for selenium load reduction from irrigated agriculture to provide stakeholder assurances and meet contaminant mass loading policy objectives  

SciTech Connect

Many perceive the implementation of environmental regulatory policy, especially concerning non-point source pollution from irrigated agriculture, as being less efficient in the United States than in many other countries. This is partly a result of the stakeholder involvement process but is also a reflection of the inability to make effective use of Environmental Decision Support Systems (EDSS) to facilitate technical information exchange with stakeholders and to provide a forum for innovative ideas for controlling non-point source pollutant loading. This paper describes one of the success stories where a standardized Environmental Protection Agency (EPA) methodology was modified to better suit regulation of a trace element in agricultural subsurface drainage and information technology was developed to help guide stakeholders, provide assurances to the public and encourage innovation while improving compliance with State water quality objectives. The geographic focus of the paper is the western San Joaquin Valley where, in 1985, evapoconcentration of selenium in agricultural subsurface drainage water, diverted into large ponds within a federal wildlife refuge, caused teratogenecity in waterfowl embryos and in other sensitive wildlife species. The fallout from this environmental disaster was a concerted attempt by State and Federal water agencies to regulate non-point source loads of the trace element selenium. The complexity of selenium hydrogeochemistry, the difficulty and expense of selenium concentration monitoring and political discord between agricultural and environmental interests created challenges to the regulation process. Innovative policy and institutional constructs, supported by environmental monitoring and the web-based data management and dissemination systems, provided essential decision support, created opportunities for adaptive management and ultimately contributed to project success. The paper provides a retrospective on the contentious planning process and offers suggestions as to how the technical and institutional issues could have been resolved faster through early adoption of some of the core principles of sound EDSS design.

Quinn, N.W.T.

2009-10-15T23:59:59.000Z

55

Dynamic Load Partitioning Strategies for Managing Data of Space and Time Heterogeneity in Parallel SAMR Applications  

Science Journals Connector (OSTI)

This paper presents the design and experimental evaluation of two dynamic load partitioning and balancing strategies for parallel Structured Adaptive Mesh Refinement (SAMR) applications: the Level-based Partit...

Xiaolin Li; Manish Parashar

2003-01-01T23:59:59.000Z

56

Impact of Industrial Electric Rate Structure on Load Management - A Utility Viewpoint  

E-Print Network (OSTI)

A few years ago our response to an inquiry regarding availability of electric service for a large industrial load was something like: 'Let us put this into our production model to determine whether we will have adequate generating capacity to commit...

Richardson, J. A.

1984-01-01T23:59:59.000Z

57

Write Off-Loading: Practical Power Management for Enterprise Storage Dushyanth Narayanan Austin Donnelly  

E-Print Network (OSTI)

-based testbed. Results show that just spinning disks down when idle saves 28­36% of energy, and write off-loading further increases the savings to 45­60%. 1 Introduction Power consumption is a major problem in our building's data center have a total of 179 disks, more than 13 disks per machine on average

Narasayya, Vivek

58

Demonstration of Smart Building Controls to Manage Building Peak Loads: Innovative Non-Wires Technologies  

SciTech Connect

As a part of the non-wires solutions effort, BPA in partnership with Pacific Northwest National Laboratory (PNNL) is exploring the use of two distributed energy resources (DER) technologies in the City of Richland. In addition to demonstrating the usefulness of the two DER technologies in providing peak demand relief, evaluation of remote direct load control (DLC) is also one of the primary objectives of this demonstration. The concept of DLC, which is used to change the energy use profile during peak hours of the day, is not new. Many utilities have had success in reducing demand at peak times to avoid building new generation. It is not the need for increased generation that is driving the use of direct load control in the Northwest, but the desire to avoid building additional transmission capacity. The peak times at issue total between 50 and 100 hours a year. A transmission solution to the problem would cost tens of millions of dollars . And since a ?non wires? solution is just as effective and yet costs much less, the capital dollars for construction can be used elsewhere on the grid where building new transmission is the only alternative. If by using DLC, the electricity use can be curtailed, shifted to lower use time periods or supplemented through local generation, the existing system can be made more reliable and cost effective.

Katipamula, Srinivas; Hatley, Darrel D.

2004-12-22T23:59:59.000Z

59

On the economic potential for electric load management in the German residential heating sector – An optimising energy system model approach  

Science Journals Connector (OSTI)

Abstract Against the background of the ambitious German targets for renewable energy and energy efficiency, this paper investigates the economic potential for thermal load management with virtual power plants consisting of micro-cogeneration plants, heat pumps and thermal storage within the residential sector. An optimising energy system model of the electricity and residential heat supply in Germany is developed in the TIMES (The Integrated MARKAL EFOM System) modelling framework and used to determine capacity developments and dispatch of electricity and residential heat generation technologies until 2050. The analysed scenarios differ with respect to the rate of technological development of heat and power devices, fuel and CO2 prices as well as renewable electricity expansion. Results show that high fuel prices and a high renewable electricity expansion favour heat pumps and insulation measures over micro-cogeneration, whereas lower fuel prices and lower renewable electricity expansion relatively favour the expansion of micro-cogeneration. In the former case heat pump capacities increase to around 67 GWel, whereas in the latter case the total capacity of micro-cogeneration reaches 8 GWel. With the aid of thermal storage, this provides considerable flexibility for electrical load shifting through heat pumps and electricity generation from micro-cogeneration in residential applications, needed for the integration of fluctuating renewable electricity technologies.

Daniel Fehrenbach; Erik Merkel; Russell McKenna; Ute Karl; Wolf Fichtner

2014-01-01T23:59:59.000Z

60

J. Air & Waste Manage. Assoc., vol 58, 2008, p. 45-54 On-board emission measurement of high loaded light duty vehicles in Algeria  

E-Print Network (OSTI)

; Nejjari et al., 2003, Atek et al., 2004). As a result, many stations of air pollution measurement and Boukadoum, 2005). Vehicle pollutant emissions constitute not only a problem of air quality in big citiesJ. Air & Waste Manage. Assoc., vol 58, 2008, p. 45-54 On-board emission measurement of high loaded

Boyer, Edmond

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Automatic energy efficiency management of data center resources by load-dependent server activation and sleep modes  

Science Journals Connector (OSTI)

Abstract The operation of large Data Centers (DC) with thousands of servers is very costly in terms of energy consumption and cooling requirements. Currently, major efforts can be observed for server virtualization and consolidation to approach a proportionality between computation amount and energy consumption. In this contribution, a generalized model is presented which allows an automatic server consolidation by a load-dependent control of server activations using multi-parallel hysteresis thresholds, cold and hot server stand-by, and Dynamic Voltage and Frequency Scaling (DVFS). For the energy-efficiency and performance analysis, a multi-server queuing model is defined which is controlled by a Finite State Machine (FSM). The parameters of the queuing model are defined such that Service Level Agreements (SLA, e.g. as mean or percentiles of response times) are guaranteed except for overload conditions. The queuing model can be exactly analyzed under Markovian process assumptions from which all relevant quality of service (QoS) and energy efficiency (EE) metrics are derived. Numerical results are provided which demonstrate the applicability of the proposed model for the DC management, in particular to theoretically quantify the tradeoff between the conflicting aims of EE and QoS.

Paul J. Kuehn; Maggie Ezzat Mashaly

2014-01-01T23:59:59.000Z

62

Lessons Learned: A review of utility experience with conservation and load management programs for commercial and industrial customers  

SciTech Connect

This report examines utility experience with conservation and load management (C LM) programs of commercial and industrial (C I) customers in order to summarize the lessons learned from program experiences to date and what these teach us about how to operate successful programs in the future. This analysis was motivated by a desire to learn about programs which achieve high participation rates and high electricity savings while remaining cost effective. Also, we wanted to review the very latest experiences with innovative program approaches -- approaches that might prove useful to utilities as they scale up their C LM activities. Specific objectives of this phase of the study are threefold: (1) To disseminate information on utility C LM experience to a nationwide audience. (2) To review current New York State utility programs and make suggestions on how these programs can be improved. (3) To collect data for the final phase of the American Council for an Energy-Efficient Economy/New York State Energy Research and Development Authority project, which will examine the savings that are achievable if C LM programs are pushed to the limit'' of current knowledge on how to structure and run cost-effective C LM programs. 19 tabs.

Nadel, S.

1990-10-01T23:59:59.000Z

63

A load predictive energy management system for supercapacitor-battery hybrid energy storage system in solar application using the Support Vector Machine  

Science Journals Connector (OSTI)

Abstract This paper presents the use of a Support Vector Machine load predictive energy management system to control the energy flow between a solar energy source, a supercapacitor-battery hybrid energy storage combination and the load. The supercapacitor-battery hybrid energy storage system is deployed in a solar energy system to improve the reliability of delivered power. The combination of batteries and supercapacitors makes use of complementary characteristic that allow the overlapping of a battery’s high energy density with a supercapacitors’ high power density. This hybrid system produces a straightforward benefit over either individual system, by taking advantage of each characteristic. When the supercapacitor caters for the instantaneous peak power which prolongs the battery lifespan, it also minimizes the system cost and ensures a greener system by reducing the number of batteries. The resulting performance is highly dependent on the energy controls implemented in the system to exploit the strengths of the energy storage devices and minimize its weaknesses. It is crucial to use energy from the supercapacitor and therefore minimize jeopardizing the power system reliability especially when there is a sudden peak power demand. This study has been divided into two stages. The first stage is to obtain the optimum SVM load prediction model, and the second stage carries out the performance comparison of the proposed SVM-load predictive energy management system with conventional sequential programming control (if-else condition). An optimized load prediction classification model is investigated and implemented. This C-Support Vector Classification yields classification accuracy of 100% using 17 support vectors in 0.004866 s of training time. The Polynomial kernel is the optimum kernel in our experiments where the C and g values are 2 and 0.25 respectively. However, for the load profile regression model which was implemented in the K-step ahead of load prediction, the radial basis function (RBF) kernel was chosen due to the highest squared correlation coefficient and the lowest mean squared error. Results obtained shows that the proposed SVM load predictive energy management system accurately identifies and predicts the load demand. This has been justified by the supercapacitor charging and leading the peak current demand by 200 ms for different load profiles with different optimized regression models. This methodology optimizes the cost of the system by reducing the amount of power electronics within the hybrid energy storage system, and also prolongs the batteries’ lifespan as previously mentioned.

Yen Yee Chia; Lam Hong Lee; Niusha Shafiabady; Dino Isa

2015-01-01T23:59:59.000Z

64

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network (OSTI)

Load Following)Imbalance Management (Load Following) Energy Imbalanceload participation in ancillary service markets, we offer the following

Heffner, Grayson

2008-01-01T23:59:59.000Z

65

Demand side management of a domestic dishwasher: Wind energy gains, financial savings and peak-time load reduction  

Science Journals Connector (OSTI)

Ireland is currently striving to achieve an ambitious target of supplying 40% of electricity demand with renewable energy by 2020. With the vast majority of this being met by wind energy, an intermittent and non-dispatchable energy source, it is inevitable that frequent substantial curtailment will occur during times of excessive generation. This paper investigates the potential for demand side management to limit the requirement for curtailment and further facilitate the integration of renewable energy by shifting the timing of electrical demand in response to various signals including pricing and wind availability. Using a domestic dishwasher as an example, significant increases in the amount of renewable electricity consumed are demonstrated with simultaneous financial savings for the consumer. Furthermore, secondary benefits such as peak-time demand reductions in excess of 60% are observed. The impact of employing demand side management based on imperfect day-ahead market predictions is also analysed and the resulting deficiencies are quantified.

P. Finn; M. O’Connell; C. Fitzpatrick

2013-01-01T23:59:59.000Z

66

Plug Load  

NLE Websites -- All DOE Office Websites (Extended Search)

Residential Commercial Commercial Industrial Lighting Energy Smart Grocer Program HVAC Program Shell Measures Commercial Kitchen & Food Service Equipment Plug Load New...

67

A Bio-Inspired Multi-Agent System Framework for Real-Time Load Management in All-Electric Ship Power Systems  

E-Print Network (OSTI)

All-electric ship power systems have limited generation capacity and finite rotating inertia compared with large power systems. Moreover, all-electric ship power systems include large portions of nonlinear loads and dynamic loads relative...

Feng, Xianyong

2012-07-16T23:59:59.000Z

68

Dynamic load balancing of applications  

DOE Patents (OSTI)

An application-level method for dynamically maintaining global load balance on a parallel computer, particularly on massively parallel MIMD computers. Global load balancing is achieved by overlapping neighborhoods of processors, where each neighborhood performs local load balancing. The method supports a large class of finite element and finite difference based applications and provides an automatic element management system to which applications are easily integrated.

Wheat, Stephen R. (Albuquerque, NM)

1997-01-01T23:59:59.000Z

69

Load Control  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Visualization and Controls Peer Review Visualization and Controls Peer Review Load Control for System Reliability and Measurement-Based Stability Assessment Dan Trudnowski, PhD, PE Montana Tech Butte, MT 59701 dtrudnowski@mtech.edu 406-496-4681 October 2006 2 Presentation Outline * Introduction - Goals, Enabling technologies, Overview * Load Control - Activities, Status * Stability Assessment - Activities, Status * Wrap up - Related activities, Staff 3 Goals * Research and develop technologies to improve T&D reliability * Technologies - Real-time load control methodologies - Measurement-based stability-assessment 4 Enabling Technologies * Load control enabled by GridWise technology (e.g. PNNL's GridFriendly appliance) * Real-time stability assessment enabled by Phasor Measurement (PMU) technology 5 Project Overview * Time line: April 18, 2006 thru April 17, 2008

70

management  

National Nuclear Security Administration (NNSA)

5%2A en Management and Budget http:nnsa.energy.govaboutusouroperationsmanagementandbudget

P...

71

Analysis Methodology for Industrial Load Profiles  

E-Print Network (OSTI)

ANALYSIS METHODOLOGY FOR INDUSTRIAL LOAD PROFILES Thomas W. Reddoch Executive Vice President Eleclrolek Concepts, Inc. Knoxvillc, Tennessee ABSTRACT A methodology is provided for evaluating the impact of various demand-side management... (OSM) options on industrial customers. The basic approach uses customer metered load profile data as a basis for the customer load shape. OSM technologies are represented as load shapes and are used as a basis for altering the customers existing...

Reddoch, T. W.

72

Load Data and Load Vector Assembly  

Science Journals Connector (OSTI)

Data for loading cases in solid mechanics problems is described. The following external loading factors can be specified: concentrated nodal forces, distributed surface forces, and thermal loading. JavaTM class F...

2010-01-01T23:59:59.000Z

73

Dietary Insulin Load, Dietary Insulin Index, and Colorectal Cancer  

Science Journals Connector (OSTI)

...using national dietary data and the nutrient database...index and glycemic load values in the NIH-AARP...multivariate models (data not shown). After...intake of glycemic load did not change our...Management Service for data management. 1 Gapstur...status and post-load plasma glucose concentration...

Ying Bao; Katharina Nimptsch; Jeffrey A. Meyerhardt; Andrew T. Chan; Kimmie Ng; Dominique S. Michaud; Jennie C. Brand-Miller; Walter C. Willett; Edward Giovannucci; and Charles S. Fuchs

2010-12-01T23:59:59.000Z

74

16 Load Data Cleansing and Bus Load  

E-Print Network (OSTI)

375 16 Load Data Cleansing and Bus Load Coincidence Factors* Wenyuan Li, Ke Wang, and Wijarn Wangdee 16.1 INTRODUCTION Load curve data refer to power consumptions recorded by meters at certain time intervals at buses of individual substations. Load curve data are one of the most important datasets

Wang, Ke

75

Power Load Forecasting Using Data Mining and Knowledge Discovery Technology  

Science Journals Connector (OSTI)

Considering the importance of the peak load to the dispatching and management of the system, the error of peak load is proposed in this paper as criteria ... proposes a systemic framework that attempts to used data

Yongli Wang; Dongxiao Niu; Yakun Wang

2010-01-01T23:59:59.000Z

76

Exploiting Home Automation Protocols for Load Monitoring in Smart Buildings  

E-Print Network (OSTI)

load con- sumes, e.g., to enable automated demand response. Al- though load monitoring and control, Sean Barker, Aditya Mishra, Prashant Shenoy, and Jeannie Albrecht University of Massachusetts Amherst@cs.williams.edu Abstract Monitoring and controlling electrical loads is crucial for demand-side energy management in smart

Massachusetts at Amherst, University of

77

Modeling simple trigeneration systems for the distribution of environmental loads  

Science Journals Connector (OSTI)

Integration of thermoeconomics and Life Cycle Analysis was carried out within the framework of an Environmental Management Information System. This combined approach identified where environmental loads were generated and tracked environmental loads ... Keywords: CO2, Environmental Management Information System, Environmental costs, Material flow networks, Trigeneration, Umberto software

Monica Carvalho; Miguel A. Lozano; Luis M. Serra; Volker Wohlgemuth

2012-04-01T23:59:59.000Z

78

Stormwater Management  

E-Print Network (OSTI)

management program must be developed that would meet the standard of reducing pollutants to the maximum extent practicable. Stormwater management programs for medium and large MS4s include measures to: ? Identify major outfalls and pollutant loadings... seeding: The vegetation used will be part of final landscaping, but during construction it prevents soil erosion. ? Mulching: Materials such as hay, grass, woodchips, gravel, or straw are placed on top of the soil to keep it from eroding. Structural...

Jaber, Fouad

2008-10-23T23:59:59.000Z

79

Load sensing system  

DOE Patents (OSTI)

A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast

Sohns, Carl W. (Oak Ridge, TN); Nodine, Robert N. (Knoxville, TN); Wallace, Steven Allen (Knoxville, TN)

1999-01-01T23:59:59.000Z

80

Loading margin Stable operating  

E-Print Network (OSTI)

Linear approximation at p1 Actual loading margin Loadingmargin Parameter p p1 p2 p3 IEEE Transactions collapse. Linear and quadratic estimates to the variation of the loading margin with respect to any sys power support, wheeling, load model param- eters, line susceptance, and generator dispatch. The accuracy

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

CALIFORNIA'S NEXT GENERATION OF LOAD MANAGEMENT STANDARDS  

E-Print Network (OSTI)

the need for new peaking generation capacity and associated transmission and distribution capacity. By reducing capacity, generation and infrastructure costs, it can lower total power costs and customer bills wholesale power spot markets more competitive and efficient and less subject to the abuse of market power

82

Largest Ice-Bank Promotes Load Management  

E-Print Network (OSTI)

California's largest ice-bank storage system is an example of how thermal storage can be applied to both new and existing buildings. At the Union Oil Company in Brea, California, one massive ice-storage system satisfies the air conditioning needs...

Brarmann, G. L.

1983-01-01T23:59:59.000Z

83

ENERGY STAR Building Upgrade Manual Chapter 7: Supplemental Load Reduction  

NLE Websites -- All DOE Office Websites (Extended Search)

7: Supplemental Load 7: Supplemental Load Reduction Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

84

NREL: Buildings Research - NREL Leads Demo of New Energy Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

correction, peak load demand shifting, frequency regulation, load management and demand response, voltage support, and uninterruptable power for grid failure ride-through. From a...

85

Building Energy Software Tools Directory: Prophet Load Profiler  

NLE Websites -- All DOE Office Websites (Extended Search)

Prophet Load Profiler Prophet Load Profiler Prophet Load Profiler logo. Internet-enabled software that empowers business energy customers to manage energy and reduce costs. Valuable to facility managers, energy managers and energy service companies, the Prophet web-based service delivers real-time and near-real-time energy information on energy consumption and demand for any size facility. A number of facilities can be managed using consumption data gathered in 15 minute, 30 minute, 60 minute, daily, weekly and monthly intervals. Users can immediately view and analyze data with an eye toward load shedding, cost avoidance strategies, energy budget management, utility cost validation and energy forecasting. All tools are contained within the Prophet Web application and enabled via the internet using a standard web

86

Best Environmental Management Practices  

E-Print Network (OSTI)

Best Environmental Management Practices Farm Animal Production Land Application of Manure management practices to avoid polluting surface or groundwater. 1. Public and private water wells Public pollution of surface waters increases. Therefore, to avoid this risk, manure P loadings should be managed

87

PO. 254 Control of Power Train Loads  

E-Print Network (OSTI)

Abstract summary Variable loads along the power train are the primary cause attributed to the failure of gears, bearings, and other mechanical components. The concept of anticipatory control applied to a wind power train is presented. This new approach to power train load management is based on the data reflecting the current status of the power train. The model driving the optimization of the power train loads considers four different objectives, including minimization of the torque variability and power maximization. A software tool for power train load management is presented. This new approach to power train load control is based on the data reflecting the current status of the power train. Such data is collected by a typical SCADA system. The model driving the optimization of the power train loads considers four different objectives, including minimization of the torque variability and power maximization. Details of the model that is applicable to different turbines are presented Objectives Goal: Transform a wind a farm into a wind power plant Example objectives: ? Minimization of the torque ramp rate ? Maximization of the power produced ? Maximization of the power quality Modify the shape of the power curve Methods Data mining/Knowledge discovery

Andrew Kusiak

88

An Automatic Load Sharing Approach for a DFIG Based Wind Generator in a Microgrid  

E-Print Network (OSTI)

An Automatic Load Sharing Approach for a DFIG Based Wind Generator in a Microgrid M. A. Barik and H generator. An automatic load sharing approach for a doubly-fed induction generator (DFIG) based wind is useful to manage the load variation of a microgrid. Index Terms--DFIG, load sharing, microgrid, pitch

Pota, Himanshu Roy

89

Load regulating expansion fixture  

DOE Patents (OSTI)

A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils is disclosed. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components. 1 fig.

Wagner, L.M.; Strum, M.J.

1998-12-15T23:59:59.000Z

90

Load regulating expansion fixture  

DOE Patents (OSTI)

A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components.

Wagner, Lawrence M. (San Jose, CA); Strum, Michael J. (San Jose, CA)

1998-01-01T23:59:59.000Z

91

Load sensing system  

DOE Patents (OSTI)

A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast inventories of stored nuclear material can be continuously monitored and inventoried of minimal cost. 4 figs.

Sohns, C.W.; Nodine, R.N.; Wallace, S.A.

1999-05-04T23:59:59.000Z

92

Predicting pipeline frost load  

SciTech Connect

A study was undertaken to find a formula for predicting the additional load imposed on underground pipelines by soil freezing. The authors conclude that a modified Boussinesq equation can be used to assess this load. Results also showed that frost affects the modulus of soil reaction and therefore the induced stress in flexible pipe.

Fielding, M.B.; Cohen, A.

1988-11-01T23:59:59.000Z

93

A Survey of Load Control Programs for Price and System Stability  

SciTech Connect

Load control and demand side load management programs have been implemented in a large number of competitive power markets. These programs can provide enhanced system security and many benefits to participants. This paper reviews and compares existing economically driven programs.

Jazayeri, P.; Schellenberg, A.; Rosehart, W. D.; Doudna, J.; Widergren, Steven E.; Lawrence, D.; Mickey, J.; Jones, S.

2005-08-01T23:59:59.000Z

94

load | OpenEI  

Open Energy Info (EERE)

load load Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Source Commercial and Residential Reference Building Models Date Released April 18th, 2013 (9 months ago) Date Updated July 02nd, 2013 (7 months ago) Keywords building building demand building load Commercial data demand Energy Consumption energy data hourly kWh load profiles Residential Data Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually

95

Scalable Load Distribution and Load Balancing for Dynamic Parallel Programs  

E-Print Network (OSTI)

shown that the algorithm scales according to the definition of scalability given following. LoadScalable Load Distribution and Load Balancing for Dynamic Parallel Programs E. Berger and J. C of an integrated load distribution-load balancing algorithm which was targeted to be both efficient and scalable

Berger, Emery

96

HLW Glass Waste Loadings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HLW HLW Glass Waste Loadings Ian L. Pegg Vitreous State Laboratory The Catholic University of America Washington, DC Overview Overview  Vitrification - general background  Joule heated ceramic melter (JHCM) technology  Factors affecting waste loadings  Waste loading requirements and projections  WTP DWPF  DWPF  Yucca Mountain License Application requirements on waste loading  Summary Vitrification  Immobilization of waste by conversion into a glass  Internationally accepted treatment for HLW  Why glass?  Amorphous material - able to incorporate a wide spectrum of elements over wide ranges of composition; resistant to radiation damage  Long-term durability - natural analogs Relatively simple process - amenable to nuclearization at large  Relatively simple process - amenable to nuclearization at large scale  There

97

Buildings Stock Load Control  

E-Print Network (OSTI)

: An assembly of the various blocks of the library of simbad and simulink permit to model building. Finally the last part prensents the study results: Graphs and tables to see the load shedding strategies impacts....

Joutey, H. A.; Vaezi-Nejad, H.; Clemoncon, B.; Rosenstein, F.

2006-01-01T23:59:59.000Z

98

Taking a Bite out of Lighting Loads  

E-Print Network (OSTI)

Take a Bite Out of Lighting Loads With LEDs Stephen Williams Toshiba Sales Support Manager ESL-KT-13-12-34 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Some LED Advantages • Less electricity ? 18w LED... = 100w PAR38 • No maintenance for years ? 50,000 LED vs.10,000 CFL • Improved light quality ? 80 CRI LED vs. 25 CRI HPS • Reduce HVAC cooling load • Advanced control options ESL-KT-13-12-34 CATEE 2013: Clean Air Through Energy Efficiency Conference, San...

Williams, S.

2013-01-01T23:59:59.000Z

99

Composite Load Model Evaluation  

SciTech Connect

The WECC load modeling task force has dedicated its effort in the past few years to develop a composite load model that can represent behaviors of different end-user components. The modeling structure of the composite load model is recommended by the WECC load modeling task force. GE Energy has implemented this composite load model with a new function CMPLDW in its power system simulation software package, PSLF. For the last several years, Bonneville Power Administration (BPA) has taken the lead and collaborated with GE Energy to develop the new composite load model. Pacific Northwest National Laboratory (PNNL) and BPA joint force and conducted the evaluation of the CMPLDW and test its parameter settings to make sure that: • the model initializes properly, • all the parameter settings are functioning, and • the simulation results are as expected. The PNNL effort focused on testing the CMPLDW in a 4-bus system. An exhaustive testing on each parameter setting has been performed to guarantee each setting works. This report is a summary of the PNNL testing results and conclusions.

Lu, Ning; Qiao, Hong (Amy)

2007-09-30T23:59:59.000Z

100

Load Monitoring CEC/LMTF Load Research Program  

SciTech Connect

This white paper addresses the needs, options, current practices of load monitoring. Recommendations on load monitoring applications and future directions are also presented.

Huang, Zhenyu; Lesieutre, B.; Yang, Steve; Ellis, A.; Meklin, A.; Wong, B.; Gaikwad, A.; Brooks, D.; Hammerstrom, Donald J.; Phillips, John; Kosterev, Dmitry; Hoffman, M.; Ciniglio, O.; Hartwell, R.; Pourbeik, P.; Maitra, A.; Lu, Ning

2007-11-30T23:59:59.000Z

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Maria Research Reactor loaded with LEU - Otwock, Poland | National Nuclear  

National Nuclear Security Administration (NNSA)

Maria Research Reactor loaded with LEU - Otwock, Poland | National Nuclear Maria Research Reactor loaded with LEU - Otwock, Poland | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Video Gallery > Maria Research Reactor loaded with LEU - ... Maria Research Reactor loaded with LEU - Otwock, Poland Maria Research Reactor loaded with LEU - Otwock, Poland

102

Truck loading rack blending  

SciTech Connect

Blending, the combining of two or more components to make a single product, has become widely used in most loading rack applications. Blending should not be confused with additive injection, which is the injection of very small doses of enhancers, detergents and dyes into a product stream. Changes in the environmental protection laws in the early 90`s have put increasing demands on marketing terminals with regards to reformulated fuels and environmental protection concerns. As a result of these new mandates, terminals have turned to blending at the loading rack as an economical and convenient means in meeting these new requirements. This paper will discuss some of these mandates and how loading rack blending is used for different applications. Various types of blending will also be discussed along with considerations for each method.

Boubenider, E. [Daniel Flow Products, Inc., Houston, TX (United States)

1995-12-01T23:59:59.000Z

103

Demand Side Management in Rangan Banerjee  

E-Print Network (OSTI)

Demand Side Management in Industry Rangan Banerjee Talk at Baroda in Birla Corporate Seminar August 31,2007 #12;Demand Side Management Indian utilities ­ energy shortage and peak power shortage. Supply for Options ­ Demand Side Management (DSM) & Load Management #12;DSM Concept Demand Side Management (DSM) - co

Banerjee, Rangan

104

jiyi.chen@bchydro.com, adriel.lau@bchydro.com, wen.yuan.li@bchydro.com, wangk@cs.sfu.ca Load Analyzer a Software Tool for Load Data Analysis  

E-Print Network (OSTI)

Analyzer ­ a Software Tool for Load Data Analysis J. CHEN1 , A. LAU1 , W. LI1 , K. WANG2 BC Hydro1 (CAN, and features of the Load Analyzer, an application software tool for load data analysis at BC Hydro. The Reliability Decision Management System (RDMS) at BC Hydro consists of data models such as a load curve model

Wang, Ke

105

Characterization of Rivastigmine Loaded Chitosan  

E-Print Network (OSTI)

cholinesterase inhibitors (ChEI). In present study rivastigmine loaded chitosan-tripolyphosphate nanoparticles

Simar Preet Kaur; Rekha Rao; Afzal Hussain; Sarita Khatkar

106

Bridge Monitoring and Loading  

E-Print Network (OSTI)

#12;1 Bridge Monitoring and Loading P. Fanning, E. OBrien Stone Arch Bridges - Modelling simulations were conducted for a range of stone arch bridges spanning 5.0m to 32m. Traditional assessment procedures for the determination of both longitudinal and transverse bridge strengths were developed

107

Bridge Monitoring and Loading  

E-Print Network (OSTI)

1 Bridge Monitoring and Loading P. Fanning, E. OBrien Stone Arch Bridges - Modelling and Assessment dimensional non- linear finite element simulations of a range of stone arch- bridges spanning 5.0m to 32m and novel assessment proce- dures for the determination of both longitudinal andtrans- verse bridge

108

recreate load le Rick Whitman  

E-Print Network (OSTI)

is an example of an initial unexpanded fos load le. It loads data for the le: u-init-y.cy0 u data for the le: e-init-y.cy0 2 #12;e-next-y.lod - this is an expanded fos load which uses erecreate load le Rick Whitman November 27, 1996 Usage The tool is invoked by entering recreate load

Sirianni, Marco

109

An MILP Formulation for Load-Side Demand Control Zhonghui Luo, Ratnesh Kumar*  

E-Print Network (OSTI)

Demand control systems can be divided functionally into supply-side and load-side control/management systems. Supply-side demand management systems, implemented by the utilities, choose between maintainingAn MILP Formulation for Load-Side Demand Control Zhonghui Luo, Ratnesh Kumar* , Joseph Sottile

Kumar, Ratnesh

110

Management Plan Management Plan  

E-Print Network (OSTI)

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

111

load profile | OpenEI Community  

Open Energy Info (EERE)

data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: applicationzip icon System Advisor Model Tool for Downloading Load Data...

112

Variable loading roller  

DOE Patents (OSTI)

An automatic loading roller for transmitting torque in traction drive devices in manipulator arm joints includes a two-part camming device having a first cam portion rotatable in place on a shaft by an input torque and a second cam portion coaxially rotatable and translatable having a rotating drive surface thereon for engaging the driven surface of an output roller with a resultant force proportional to the torque transmitted. Complementary helical grooves in the respective cam portions interconnected through ball bearings interacting with those grooves effect the rotation and translation of the second cam portion in response to rotation of the first. 14 figs.

Williams, D.M.

1988-01-21T23:59:59.000Z

113

MTS Table Top Load frame  

NLE Websites -- All DOE Office Websites (Extended Search)

MTS Table Top Load frame MTS Table Top Load frame The Non-destructive Evaluation group operates an MTS Table Top Load frame for ultimate strength and life cycle testing of various ceramic, ceramic-matrix (FGI), carbon, carbon fiber, cermet (CMC) and metal alloy engineering samples. The load frame is a servo-hydraulic type designed to function in a closed loop configuration under computer control. The system can perform non-cyclic, tension, compression and flexure testing and cyclic fatigue tests. The system is comprised of two parts: * The Load Frame and * The Control System. Load Frame The Load Frame (figure 1) is a cross-head assembly which includes a single moving grip, a stationary grip and LVDT position sensor. It can generate up to 25 kN (5.5 kip) of force in the sample under test and can

114

Measured Peak Equipment Loads in Laboratories  

E-Print Network (OSTI)

of measured equipment load data for laboratories, designersmeasured peak equipment load data from 39 laboratory spacesmeasured equipment load data from various laboratory spaces

Mathew, Paul A.

2008-01-01T23:59:59.000Z

115

Hospitality Management Hospitality Management  

E-Print Network (OSTI)

of the global hospitality industry. Academic Offerings HOSPITALITY AND FOOD SERVICE MANAGEMENT MINOR HOSPITALITY AND FOOD SERVICE MANAGEMENT MINOR Students pursuing programs in other areas of study may choose a minor Lodging Management 3 HPM 309 Sports Arena Management 3 HPM 312* Cost Control in Food Services (Prereq

McConnell, Terry

116

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

at PSE is to collect load data for validating dynamic and approach decomposes recorded load data into different load “to continuously record load data for a selected time period

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

117

High-Power Rf Load  

DOE Patents (OSTI)

A compact high-power RF load comprises a series of very low Q resonators, or chokes [16], in a circular waveguide [10]. The sequence of chokes absorb the RF power gradually in a short distance while keeping the bandwidth relatively wide. A polarizer [12] at the input end of the load is provided to convert incoming TE.sub.10 mode signals to circularly polarized TE.sub.11 mode signals. Because the load operates in the circularly polarized mode, the energy is uniformly and efficiently absorbed and the load is more compact than a rectangular load. Using these techniques, a load having a bandwidth of 500 MHz can be produced with an average power dissipation level of 1.5 kW at X-band, and a peak power dissipation of 100 MW. The load can be made from common lossy materials, such as stainless steel, and is less than 15 cm in length. These techniques can also produce loads for use as an alternative to ordinary waveguide loads in small and medium RF accelerators, in radar systems, and in other microwave applications. The design is easily scalable to other RF frequencies and adaptable to the use of other lossy materials.

Tantawi, Sami G. (San Mateo, CA); Vlieks, Arnold E. (Livermore, CA)

1998-09-01T23:59:59.000Z

118

Maximizing efficiency of solar-powered systems by load matching  

Science Journals Connector (OSTI)

Solar power is an important source of renewable energy for many low-power systems. Matching the power consumption level with the supply level can make a great difference in the efficiency of power utilization. This paper proposes a source-tracking power ... Keywords: load matching, photovoltaics, power management, power model, solar energy, solar-aware

Dexin Li; Pai H. Chou

2004-08-01T23:59:59.000Z

119

Online Load Balancing for Related Machines  

E-Print Network (OSTI)

of entire schedule s as follows: load(s; i) = 1 v i X s(j)=i p j ; Load(s) = max i load(s; i) It is easyOn­line Load Balancing for Related Machines Piotr Berman \\Lambda Moses Charikar y Marek Karpinski z­line load balancing was studied extensively over the years (cf., e.g., [7], [3], [4], and [2

Karpinski, Marek

120

2012 Load as a Resource Program Peer Review | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Load as a Resource Program Peer Review Load as a Resource Program Peer Review 2012 Load as a Resource Program Peer Review The Transmission Reliability R&D Load as a Resource (LAAR) Program peer review included 8 presentations on September 20, 2012 at Lawrence Berkeley National Lab. Agenda and presentations are below. 2012 LAAR Program Peer Review - Agenda 2012 LAAR Program Peer Review - Frequency Response Demand - Jeff Dagle, PNNL 2012 LAAR Program Peer Review - Frequency Responsive Load Evaluation and Benefits - Isabelle Snyder, ORNL 2012 LAAR Program Peer Review - Load as a Regulation Resource, Phase 2 - Sila Kiliccote, LBNL 2012 LAAR Program Peer Review - Scoping Study on Industrial Regulation - Nasr Alkadi, ORNL 2012 LAAR Program Peer Review - Integration and Extension of Direct Load Management of Smart Loads - Anna Scaglioni, UC Davis

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

2003 Pacific Northwest Loads and Resources Study.  

SciTech Connect

The Pacific Northwest Loads and Resources Study (White Book), which is published annually by the Bonneville Power Administration (BPA), establishes one of the planning bases for supplying electricity to customers. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues, although the database that generates the data for the White Book analysis contributes to the development of BPA's inventory and ratemaking processes. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions that include expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. In this loads and resources study, resource availability is compared to an expected level of total retail electricity consumption. The forecasted annual energy electricity retail load plus contract obligations are subtracted from the sum of the projected annual energy capability of existing resources and contract purchases to determine whether BPA and/or the region will be surplus or deficit. Surplus energy is available when resources are greater than loads. This energy could be marketed to increase revenues. Deficits occur when resources are less than loads. Energy deficits could be met by any combination of the following: better-than-critical water conditions, demand-side management and conservation programs, permanent loss of a load (i.e., due to economic conditions or closures), additional contract purchases, and/or new generating resources. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA). The PNCA defines the planning and operation of seventeen U.S. Pacific Northwest utilities and other parties with generating facilities within the region's hydroelectric (hydro) system. The hydroregulation study used for the 2003 White Book incorporates measures from the National Oceanographic and Atmospheric Administration Fisheries (NOAA Fisheries) Biological Opinion dated December 2000, and the U.S. Fish and Wildlife Service's 2000 Biological Opinion (2000 FCRPS BiOps) for the Snake River and Columbia River projects. These measures include: (1) Increased flow augmentation for juvenile fish migrations in the Snake and Columbia rivers in the spring and summer; (2) Mandatory spill requirements at the Lower Snake and Columbia dams to provide for non-turbine passage routes for juvenile fish migrants; and (3) Additional flows for Kootenai River white sturgeon in the spring. The hydroregulation criteria for this analysis includes: an updated Detailed Operation Plan for Treaty reservoirs for Operating Year (OY) 2004, updated PNCA planning criteria for OY 2003, and revised juvenile fish bypass spill levels for 2000 FCRPS BiOps implementation. The 2003 White Book is presented in two documents: (1) this summary document of Federal system and PNW region loads and resources, and (2) a technical appendix which presents regional loads, grouped by major PNW utility categories, and detailed contract and resource information. The technical appendix is available only in electronic form. Individual customer information regarding marketer contracts is not detailed due to confidentiality agreements. The 2003 White Book analysis updates the December 2002 White Book. This analysis projects the yearly average energy consumption and resource availability

United States. Bonneville Power Administration.

2003-12-01T23:59:59.000Z

122

Spring loaded locator pin assembly  

DOE Patents (OSTI)

This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece.

Groll, Todd A. (Idaho Falls, ID); White, James P. (Pocatelo, ID)

1998-01-01T23:59:59.000Z

123

Spring loaded locator pin assembly  

DOE Patents (OSTI)

This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece. 5 figs.

Groll, T.A.; White, J.P.

1998-03-03T23:59:59.000Z

124

Load Forecasting of Supermarket Refrigeration  

E-Print Network (OSTI)

energy system. Observed refrigeration load and local ambient temperature from a Danish su- permarket renewable energy, is increasing, therefore a flexible energy system is needed. In the present ThesisLoad Forecasting of Supermarket Refrigeration Lisa Buth Rasmussen Kongens Lyngby 2013 M.Sc.-2013

125

Improving the Performance of the Truncated Fourier Series Least Squares (TFSLS)Power System Load Model Using an Artificial Neural Network Paradigm  

Science Journals Connector (OSTI)

Power System Load models have a wide range of application in the electric power industry including applications involving: (i) load management policy monitoring; (ii) assisting with ... A method that has been uti...

Shonique L. Miller; Gary L. Lebby…

2010-01-01T23:59:59.000Z

126

building load | OpenEI  

Open Energy Info (EERE)

load load Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Source Commercial and Residential Reference Building Models Date Released April 18th, 2013 (9 months ago) Date Updated July 02nd, 2013 (7 months ago) Keywords building building demand building load Commercial data demand Energy Consumption energy data hourly kWh load profiles Residential Data Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually

127

Load Schedule Coordination for a Large Linear Accelerator: An Operation Powerplay Concept  

E-Print Network (OSTI)

Operation Powerplay is a viable electric load management program developed and tested with Department of Energy funding and support. It is a concept designed to provide financial benefits to a utility and one or more of its customers through...

Johnson, W. H.

1984-01-01T23:59:59.000Z

128

load data | OpenEI Community  

Open Energy Info (EERE)

51 51 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142234851 Varnish cache server load data Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI! building load building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: application/zip icon System Advisor Model Tool for Downloading Load Data

129

Energy-Agile Laptops: Demand Response of Mobile Plug Loads Using Sensor/Actuator Networks  

E-Print Network (OSTI)

Energy-Agile Laptops: Demand Response of Mobile Plug Loads Using Sensor/Actuator Networks Nathan@me.berkeley.edu Abstract--This paper explores demand response techniques for managing mobile, distributed loads with on observed. Our first simulation study explores a classic demand response scenario in which a large number

Culler, David E.

130

Electrical and Production Load Factors  

E-Print Network (OSTI)

, Texas Abstract Load factors and operating hours of small and medium-sized industrial plants are analyzed to classify shift-work patterns and develop energy conservation diagnostic tools. This paper discusses two types of electric load factors... for each shift classification within major industry groups. The load factor based on billing hours (ELF) increases with operating hours from about 0.4 for a nominal one shift operation, to about 0.7 for around-the-clock operation. On the other hand...

Sen, T.; Heffington, W. M.

131

Power management system  

DOE Patents (OSTI)

A method of managing power resources for an electrical system of a vehicle may include identifying enabled power sources from among a plurality of power sources in electrical communication with the electrical system and calculating a threshold power value for the enabled power sources. A total power load placed on the electrical system by one or more power consumers may be measured. If the total power load exceeds the threshold power value, then a determination may be made as to whether one or more additional power sources is available from among the plurality of power sources. At least one of the one or more additional power sources may be enabled, if available.

Algrain, Marcelo C. (Peoria, IL); Johnson, Kris W. (Washington, IL); Akasam, Sivaprasad (Peoria, IL); Hoff, Brian D. (East Peoria, IL)

2007-10-02T23:59:59.000Z

132

electric load data | OpenEI Community  

Open Energy Info (EERE)

load data Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI building load building...

133

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

Bulk System Load  Model in GE PSLF TM for Investigating the a Bulk System Load Model in GE PSLF TM for Investigating thecomposite load model in  the PSLF simulation software; the 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

134

Determining Electric Motor Load and Efficiency  

Energy.gov (U.S. Department of Energy (DOE))

To compare the operating costs of an existing standard motor with an appropriately-sized energy-efficient replacement, you need to determine operating hours, efficiency improvement values, and load. Part-load is a term used to describe the actual load served by the motor as compared to the rated full-load capability of the motor. Motor part-loads may be estimated through using input power, amperage, or speed measurements. This fact sheet briefly discusses several load estimation techniques.

135

Influence of loading rate on axially loaded piles in clay  

E-Print Network (OSTI)

, Haas and Saxe Yong and Japp. Arulanandan and Shen 4 ~ ~ ~ ~ ~ ~ 4 5 5 6 6 13 13 21 21 22 22 23 23 24 24 Ladd, Hi11iams, Connell and Edgars Berre and Bjerrum. Stevenson. King Vaid and Campanella. Lacasse. Rigqins. CHAPTER V... of the Gain in Strength versus Shearing Rate Plots 4. Select Regression, PI, LI, W, SO(REF) 76 Cases for 152 Laboratory Tests 5. Collected Data for Pile Load Test Results. 6. Data Set References for Pile Load Tests. Page 14 36 54 61 7. Semi...

Garland Ponce, Enrique Eduardo

2012-06-07T23:59:59.000Z

136

Cooling load design tool for UFAD systems.  

E-Print Network (OSTI)

Underfloor Air Distribution (UFAD) Design Guide. Atlanta:Load Design Tool for Underfloor Air Distribution Systems. ”for design cooling loads in underfloor air distribution (

Bauman, Fred; Schiavon, Stefano; Webster, Tom; Lee, Kwang Ho

2010-01-01T23:59:59.000Z

137

Self-aligning biaxial load frame  

DOE Patents (OSTI)

An self-aligning biaxial loading apparatus for use in testing the strength of specimens while maintaining a constant specimen centroid during the loading operation. The self-aligning biaxial loading apparatus consists of a load frame and two load assemblies for imparting two independent perpendicular forces upon a test specimen. The constant test specimen centroid is maintained by providing elements for linear motion of the load frame relative to a fixed crosshead, and by alignment and linear motion elements of one load assembly relative to the load frame.

Ward, Michael B. (Idaho Falls, ID); Epstein, Jonathan S. (Idaho Falls, ID); Lloyd, W. Randolph (Idaho Falls, ID)

1994-01-01T23:59:59.000Z

138

Self-aligning biaxial load frame  

DOE Patents (OSTI)

An self-aligning biaxial loading apparatus for use in testing the strength of specimens while maintaining a constant specimen centroid during the loading operation. The self-aligning biaxial loading apparatus consists of a load frame and two load assemblies for imparting two independent perpendicular forces upon a test specimen. The constant test specimen centroid is maintained by providing elements for linear motion of the load frame relative to a fixed cross head, and by alignment and linear motion elements of one load assembly relative to the load frame. 3 figures.

Ward, M.B.; Epstein, J.S.; Lloyd, W.R.

1994-01-18T23:59:59.000Z

139

Learning to be energy-wise: discriminative methods for load disaggregation  

Science Journals Connector (OSTI)

In this paper we describe an ongoing project which develops an automated residential Demand Response (DR) system that attempts to manage residential loads in accordance with DR signals. In this early stage of the project, we propose an approach for identifying ... Keywords: context-awareness, data mining, energy management, non-intrusive, ubiquitous computing

Dwi Rahayu; Balakrishnan Narayanaswamy; Shonali Krishnaswamy; Cyril Labbé; Deva P. Seetharam

2012-05-01T23:59:59.000Z

140

Load-Aware Dynamic Replication Management in a Data Grid  

Science Journals Connector (OSTI)

Data Grids are increasingly popular in novel, demanding and data-intensive eScience applications. In these applications, vast amounts of data, generated by specialized instruments, need to ... organizations. The ...

Laura Cristiana Voicu…

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

ELECTRICAL LOAD MANAGEMENT FOR THE CALIFORNIA WATER SYSTEM  

E-Print Network (OSTI)

DWR Bulletin 194. Hydroelectric Energy Potential inmore than 6 bil- of hydroelectric poweL of view of energyfrom peak demand Daytime hydroelectric Two wate:r age) would

Krieg, B.

2010-01-01T23:59:59.000Z

142

{Control of Residential Load Management Networks Using Real Time Pricing  

E-Print Network (OSTI)

Modular and Extensible Systemic Simulation of Demand Response Networks 2.1 Introduction Thermostatically controlled devices, such as heating ventilation and air conditioning (HVAC), refrigerators,

Burke, William Jerome

2010-01-01T23:59:59.000Z

143

ELEMENT C: Management Measures Necessary to Achieve Your Load Reductions,  

E-Print Network (OSTI)

: MILL CREEK Oils and greaseOil-Grease Separators NutrientsMonitor Bettis Cr. Per NPDES Permit Nutrients

144

ELECTRICAL LOAD MANAGEMENT FOR THE CALIFORNIA WATER SYSTEM  

E-Print Network (OSTI)

sections of aqueducts. Hydroelectric power generated withinthe CVP generates only hydroelectric power, its By importing

Krieg, B.

2010-01-01T23:59:59.000Z

145

Transportation and Program Management Services  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Atlanta, Georgia Atlanta, Georgia Transportation and Program Management Services Secured Transportation Services, LLC Founded: December, 2003 ff Staff: 7 Experience: Over 145 years combined experience in Nuclear Transportation, Security, HP & Operations Services Transportation The largest Transportation Coordinators of Spent Nuclear Fuel in North America On-Site, Hands-On Assistance (Before & During both Loading & Transport) P d A i t (W iti d/ R i ) Procedure Assistance (Writing and/or Review) Package Handling, Loading Services Certificate of Compliance and Competent Authority Reviews & Requests Carrier Coordination (Empty Packages & Equipment, Loaded, & Returns) Vessel Charters, Special Trains, Dedicated Exclusive Use Trucks p

146

Stochastic Models and Analysis for Resource Management in Server Farms  

E-Print Network (OSTI)

farms. State-of-the-art servers come with multiple knobs to control energy consumption, but traditionalStochastic Models and Analysis for Resource Management in Server Farms Varun Gupta CMU-CS-11, Multi-server systems, Load balancing, Scheduling, M/G/k, Time-varying load, Energy management

147

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

E-Print Network (OSTI)

Determining Electric Motor Load and Efficiency. Among theEnergy Efficiency Alliance, Electric Motor Management. 2001.Energy Efficiency Alliance, Electric Motor Management. 2001.

Brown, Moya Melody, Camilla Dunham Whitehead, Rich

2011-01-01T23:59:59.000Z

148

Thermal loading study for FY 1996. Volume 1  

SciTech Connect

The primary objective of this study was to provide recommendations for Mined Geologic Disposal System requirements affected by thermal loading that will provide sufficient definition to facilitate development of design concepts and support life cycle cost determinations. The study reevaluated and/or redefined selected thermal goals used for design and are currently contained in the requirements documents or the Controlled Design Assumption Document. The study provided recommendations as to what, if any, actions (such as edge loading and limiting of the heat variability between waste packages) are needed and must be accommodated in the design. Additionally, the study provided recommendations as to what alternative thermal loads should be maintained for continued flexibility. Section 1 provides the study objective, background, scope, and organization of the report. Section 2 documents the requirements and standards to include quality assurance (QA) requirements, any requirements used or evaluated, and the inputs and assumptions considered. Section 3 provides the analysis and recommendations for the thermal goals reevaluation. Section 4 discusses the evaluation of edge loading and provides conclusions. Section 5 provides the analyses done to establish recommendations as to what requirements need to be implemented to either limit or manage the amount of heat output variability that may occur. Section 6 discusses alternate thermal loadings; Section 7 provides the study conclusions and recommendations; Section 8 provides the references, standards, and regulations; and Section 9 contains the acronym list.

NONE

1996-11-08T23:59:59.000Z

149

Session K--Fuel Loadings in Forests, Woodlands, and Savannas--Ffolliott, Gottfried, DeBano USDA Forest Service Gen. Tech. Rep. PSW-GTR-189. 2008. 271  

E-Print Network (OSTI)

Session K--Fuel Loadings in Forests, Woodlands, and Savannas--Ffolliott, Gottfried, DeBano USDA Forest Service Gen. Tech. Rep. PSW-GTR-189. 2008. 271 Fuel Loadings in Forests, Woodlands, and Savannas to increase the loadings of downed woody fuels. Ecologists and land managers are reintroducing fire

Standiford, Richard B.

150

Macro Data Load: An Efficient Mechanism for Enhancing Loaded Data Reuse  

E-Print Network (OSTI)

Macro Data Load: An Efficient Mechanism for Enhancing Loaded Data Reuse Lei Jin and Sangyeun Cho, Member, IEEE Abstract--This paper presents a study on macro data load, a novel mechanism to increase the amount of loaded data reuse within a processor. A macro data load brings into the processor a maximum

Cho, Sangyeun

151

PASSIVE DETECTION OF VEHICLE LOADING  

SciTech Connect

The Digital Imaging and Remote Sensing Laboratory (DIRS) at the Rochester Institute of Technology, along with the Savannah River National Laboratory is investigating passive methods to quantify vehicle loading. The research described in this paper investigates multiple vehicle indicators including brake temperature, tire temperature, engine temperature, acceleration and deceleration rates, engine acoustics, suspension response, tire deformation and vibrational response. Our investigation into these variables includes building and implementing a sensing system for data collection as well as multiple full-scale vehicle tests. The sensing system includes; infrared video cameras, triaxial accelerometers, microphones, video cameras and thermocouples. The full scale testing includes both a medium size dump truck and a tractor-trailer truck on closed courses with loads spanning the full range of the vehicle's capacity. Statistical analysis of the collected data is used to determine the effectiveness of each of the indicators for characterizing the weight of a vehicle. The final sensing system will monitor multiple load indicators and combine the results to achieve a more accurate measurement than any of the indicators could provide alone.

Garrett, A.

2012-01-03T23:59:59.000Z

152

Online Load Balancing for Related Machines 1 Piotr Berman  

E-Print Network (OSTI)

), the load of a machine i in schedule s and Load(s), the load of entire schedule s as follows: load(s; i) = 1On­line Load Balancing for Related Machines 1 Piotr Berman The Pennsylvania State University of randomized algorithms for this problem. Key Words: on­line algorithm, load balancing, related machines

Charikar, Moses

153

2012 CERTS LAAR Program Peer Review - Frequency Responsive Load Evaluation and Benefits - Isabelle Snyder, ORNL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Frequency responsive loads Isabelle Snyder, Ph.D. Power and Energy Systems Group ORNL 2 Managed by UT-Battelle for the U.S. Department of Energy Presentation_name Project objective * Study the use of load for frequency regulation: - Identify frequency measurement accuracies based on different approaches - Identify accuracy requirement for frequency responsive load applications - Study the impact of frequency responsive loads on a large system (ERCOT or EI) 3 Managed by UT-Battelle for the U.S. Department of Energy Presentation_name Major technical accomplishments: overview * Identified requirements of measurement devices to satisfy accuracy requirements for frequency measurement * Initiated request for ERCOT and EI models: - ERCOT (market participant's concern about releasing ERCOT

154

Program Managers  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Managers Program Managers Enabling remarkable discoveries and tools that transform our understanding of energy and matter and advance national, economic, and energy...

155

1994 Pacific Northwest Loads and Resources Study.  

SciTech Connect

The 1994 Pacific Northwest Loads and Resources Study presented herein establishes a picture of how the agency is positioned today in its loads and resources balance. It is a snapshot of expected resource operation, contractual obligations, and rights. This study does not attempt to present or analyze future conservation or generation resource scenarios. What it does provide are base case assumptions from which scenarios encompassing a wide range of uncertainties about BPA`s future may be evaluated. The Loads and Resources Study is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the 1993 Pacific Northwest Loads and Resources Study, published in December 1993. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The Federal system and regional analyses for medium load forecast are presented.

United States. Bonneville Power Administration.

1994-12-01T23:59:59.000Z

156

Helicase Loading at Chromosomal Origins of Replication  

E-Print Network (OSTI)

Loading of the replicative DNA helicase at origins of replication is of central importance in DNA replication. As the first of the replication fork proteins assemble at chromosomal origins of replication, the loaded helicase ...

Bell, Stephen P.

157

Definition: Congestion Management Report | Open Energy Information  

Open Energy Info (EERE)

Management Report Management Report Jump to: navigation, search Dictionary.png Congestion Management Report A report that the Interchange Distribution Calculator issues when a Reliability Coordinator initiates the Transmission Loading Relief procedure. This report identifies the transactions and native and network load curtailments that must be initiated to achieve the loading relief requested by the initiating Reliability Coordinator.[1] View on Wikipedia Wikipedia Definition Related Terms transmission lines, Reliability Coordinator, Interchange Distribution Calculator, transmission line, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Congestion_Management_Report&oldid=502584"

158

A Novel Approach to Determining Motor Load  

E-Print Network (OSTI)

A NOVEL APPROACH TO DETERMINING MOTOR LOAD by Michael Brown Georgia Tech Research Institute Atlanta, Georgia ABSTRACf Properly sized electric motors are essential if industrial plant efficiency is to be optimized and energy costs... minimized. Because of the difficully in making power measurements on three phase motors, loading is rarely, if ever, checked. A simple indication of motor load can be achieved by measuring operating speed because speed and load are almost linearly...

Brown, M.

159

Chapter 6 - Stage 3: Data Load  

Science Journals Connector (OSTI)

Summary This chapter discusses the Data Load stage of the Guerrilla Analytics workflow. Data Load involves getting data from a receipt location (generally the file system) and loading it into the Data Manipulation Environment (DME). In this chapter, you will learn about the various activities that take place at Data Load. You will learn about the pitfalls and risks in these activities. You will then learn a number of practice tips to mitigate those risks.

Enda Ridge

2015-01-01T23:59:59.000Z

160

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

BPA), the basic requirements for an improved load model were determined. These requirements included modeling the substation

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Power load forecasting using data mining and knowledge discovery technology  

Science Journals Connector (OSTI)

Considering the importance of the peak load to the dispatching and management of the electric system, the error of peak load is proposed in this paper as criteria to evaluate the effect of the forecasting model. This paper proposes a systemic framework that attempts to use data mining and knowledge discovery (DMKD) to pretreat the data. And a new model is proposed which combines artificial neural networks with data mining and knowledge discovery for electric load forecasting. With DMKD technology, the system not only could mine the historical daily loading which had the same meteorological category as the forecasting day to compose data sequence with highly similar meteorological features, but also could eliminate the redundant influential factors. Then an artificial neural network is constructed to predict according to its characteristics. Using this new model, it could eliminate the redundant information, accelerate the training speed of neural network and improve the stability of the convergence. Compared with single BP neural network, this new method can achieve greater forecasting accuracy.

Yongli Wang; Dongxiao Niu; Ling Ji

2011-01-01T23:59:59.000Z

162

Structures buckling under tensile dead load  

Science Journals Connector (OSTI)

...the load measured with a load cell Gefran OC-K2D-C3...PY-2-F-100 (Gefran Spa). Data have been acquired with...elementsAmsterdamElsevier Data Supplement Data Supplement Structures buckling under tensile dead load. A movie of the experiments...

2011-01-01T23:59:59.000Z

163

Flow Duration Curve Load Duration Curve  

E-Print Network (OSTI)

and concentration data--select appropriate conversion factors 3. Develop Load Duration Curve 4. Plot observed data there has been no flow at this site #12;Gather daily flow rate data Load data into a spreasheet Sort largest, etc) Calculate percentage of days flow was exceeded: How do you estimate load with given data

164

Flow Duration Curve Load Duration Curve  

E-Print Network (OSTI)

given flow and concentration data--select appropriate conversion factors 3. Develop Load Duration Curve 4. Plot observed data with Load Duration Curve #12;What are they? How do you make one? #12;DescribesRangeFlows LowFlows 40 % of the time there has been no flow at this site #12;Gather daily flow rate data Load

165

Review of Strategies and Technologies for Demand-Side Management on Isolated Mini-Grids  

E-Print Network (OSTI)

demand- side management (DSM) on mini-grids throughout theunderpin the need to employ DSM to reduce load or spreadand technologies for DSM vary. As described above, one

Harper, Meg

2014-01-01T23:59:59.000Z

166

Low reflectance radio frequency load  

DOE Patents (OSTI)

A load for traveling microwave energy has an absorptive volume defined by cylindrical body enclosed by a first end cap and a second end cap. The first end cap has an aperture for the passage of an input waveguide with a rotating part that is coupled to a reflective mirror. The inner surfaces of the absorptive volume consist of a resistive material or are coated with a coating which absorbs a fraction of incident RF energy, and the remainder of the RF energy reflects. The angle of the reflector and end caps is selected such that reflected RF energy dissipates an increasing percentage of the remaining RF energy at each reflection, and the reflected RF energy which returns to the rotating mirror is directed to the back surface of the rotating reflector, and is not coupled to the input waveguide. Additionally, the reflector may have a surface which generates a more uniform power distribution function axially and laterally, to increase the power handling capability of the RF load. The input waveguide may be corrugated for HE11 mode input energy.

Ives, R. Lawrence; Mizuhara, Yosuke M

2014-04-01T23:59:59.000Z

167

APS high heat load monochromator  

SciTech Connect

This document contains the design specifications of the APS high heat load (HHL) monochromator and associated accessories as of February 1993. It should be noted that work is continuing on many parts of the monochromator including the mechanical design, crystal cooling designs, etc. Where appropriate, we have tried to add supporting documentation, references to published papers, and calculations from which we based our decisions. The underlying philosophy behind performance specifications of this monochromator was to fabricate a device that would be useful to as many APS users as possible, that is, the design should be as generic as possible. In other words, we believe that this design will be capable of operating on both bending magnet and ID beamlines (with the appropriate changes to the cooling and crystals) with both flat and inclined crystal geometries and with a variety of coolants. It was strongly felt that this monochromator should have good energy scanning capabilities over the classical energy range of about 4 to 20 keywith Si (111) crystals. For this reason, a design incorporating one rotation stage to drive both the first and second crystals was considered most promising. Separate rotary stages for the first and second crystals can sometimes provide more flexibility in their capacities to carry heavy loads (for heavily cooled first crystals or sagittal benders of second crystals), but their tuning capabilities were considered inferior to the single axis approach.

Lee, W.K.; Mills, D.

1993-02-01T23:59:59.000Z

168

System and method employing a minimum distance and a load feature database to identify electric load types of different electric loads  

DOE Patents (OSTI)

A method identifies electric load types of a plurality of different electric loads. The method includes providing a load feature database of a plurality of different electric load types, each of the different electric load types including a first load feature vector having at least four different load features; sensing a voltage signal and a current signal for each of the different electric loads; determining a second load feature vector comprising at least four different load features from the sensed voltage signal and the sensed current signal for a corresponding one of the different electric loads; and identifying by a processor one of the different electric load types by determining a minimum distance of the second load feature vector to the first load feature vector of the different electric load types of the load feature database.

Lu, Bin; Yang, Yi; Sharma, Santosh K; Zambare, Prachi; Madane, Mayura A

2014-12-23T23:59:59.000Z

169

1993 Pacific Northwest Loads and Resources Study.  

SciTech Connect

The Loads and Resources Study is presented in three documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The forecasted future electricity demands -- firm loads -- are subtracted from the projected capability of existing and {open_quotes}contracted for{close_quotes} resources to determine whether Bonneville Power Administration (BPA) and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, and additional conservation, contract purchases, or generating resources will be needed to meet load growth. The Pacific Northwest Loads and Resources Study analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resource in addition to the Federal system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. This study presents the Federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1994--95 through 2003--04.

United States. Bonneville Power Administration.

1993-12-01T23:59:59.000Z

170

Conference Management  

Directives, Delegations, and Requirements

To establish requirements and responsibilities with respect to managing conferences sponsored by the Department of Energy (DOE) or by DOE management and operating contractors and other contractors who perform work at DOE-owned or -leased facilities, including management and integration contractors and environmental restoration management contractors (when using funds that will be reimbursed by DOE). Cancels DOE N 110.3.

1999-11-03T23:59:59.000Z

171

High payload six-axis load sensor  

DOE Patents (OSTI)

A repairable high-payload six-axis load sensor includes a table, a base, and at least three shear-pin load transducers removably mounted between the table and the base. Removable mounting permits easy replacement of damaged shear pins. Preferably, the shear-pin load transducers are responsive to shear forces imparted along the two axes perpendicular to an axis of minimum sensitivity characteristic of the transducer. Responsive to an applied shear force, each shear-pin load transducer can produce an electrical signal proportional to the reaction force. The load sensor can further include a structure for receiving the proportional electrical signals and computing the applied load corresponding to the proportional electrical signals. The computed load can be expressed in terms of a three-dimensional XYZ Cartesian coordinate system.

Jansen, John F. (Knoxville, TN); Lind, Randall F. (Knoxville, TN)

2003-01-01T23:59:59.000Z

172

High voltage load resistor array  

DOE Patents (OSTI)

A high voltage resistor comprising an array of a plurality of parallel electrically connected resistor elements each containing a resistive solution, attached at each end thereof to an end plate, and about the circumference of each of the end plates, a corona reduction ring. Each of the resistor elements comprises an insulating tube having an electrode inserted into each end thereof and held in position by one or more hose clamps about the outer periphery of the insulating tube. According to a preferred embodiment, the electrode is fabricated from stainless steel and has a mushroom shape at one end, that inserted into the tube, and a flat end for engagement with the end plates that provides connection of the resistor array and with a load.

Lehmann, Monty Ray (Smithfield, VA)

2005-01-18T23:59:59.000Z

173

Price-Responsive Load (PRL) Program - Framing Paper No.1  

SciTech Connect

By definition, effective and efficient competitive markets need a supply side and a demand side. One criticism of electric restructuring efforts in many states is that most of the attention has been focused on the supply side, in a market focused on the short term. In general, the demand side of the market has been under-addressed. The objective of the New England Demand Response Initiative (NEDRI) is to develop a comprehensive, coordinated set of demand response programs for the New England regional power markets. NEDRI aims to maximize the capability of demand response to compete in the wholesale market and to improve the economic efficiency and environmental profile of the electric sector. To those ends, NEDRI is focusing its efforts in four interrelated areas: (1) ISO-level reliability programs, (2) Market-based price-responsive load programs, (3) Demand response at retail through pricing, rate design, and advanced metering, and (4) End-use energy efficiency resources as demand response. The fourth area, energy efficiency, is the subject of this framing paper. Energy efficiency reduces the energy used by specific end-use devices and systems, typically without affecting the level of service and without loss of amenity. Energy savings and peak load reductions are achieved by substituting technically more advanced equipment, processes, or operational strategies to produce the same or an improved level of end-use service with less electricity. In contrast, load management programs lower peak demand during specific, limited time periods by either (1) influencing the timing of energy use by shifting load to another time period, or (2) reducing the level of energy use by curtailing or interrupting the load, typically with some loss of service or amenity.

Goldman, Charles A.

2002-03-01T23:59:59.000Z

174

Methods for Analyzing Electric Load Shape and its Variability  

E-Print Network (OSTI)

graphical displays of load data. We then define someAlthough simply overlaying load data from different timeprovide a good fit to load data in most buildings; their

Price, Philip

2010-01-01T23:59:59.000Z

175

Estimating Demand Response Load Impacts: Evaluation of Baseline Load Models for Non-Residential Buildings in California  

E-Print Network (OSTI)

electric  interval  load  data  are  available  through details,  each uses electric load data from a period before using  customer  load  data  [KEMA  2003,  Quantum  2004, 

Coughlin, Katie; Piette, Mary Ann; Goldman, Charles; Kiliccote, Sila

2008-01-01T23:59:59.000Z

176

Management Responsibilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Responsibilities Management Responsibilities Depleted UF6 Management Responsibilities DOE has responsibility for safe and efficient management of approximately 700,000 metric tons of depleted UF6. Organizational Responsibilities In the United States, the U.S. Department of Energy is responsible for managing all the depleted uranium that has been generated by the government and has been declared surplus to national defense needs. In addition, as a result of two memoranda of agreement that have been signed between the DOE and USEC, the DOE has assumed management responsibility for approximately 145,000 metric tons of depleted UF6 that has been or will be generated by USEC. Any additional depleted UF6 that USEC generates will be USEC's responsibility to manage. DOE Management Responsibility

177

Reservoir compaction loads on casings and liners  

SciTech Connect

Pressure drawdown due to production from a reservoir causes compaction of the reservoir formation which induces axial and radial loads on the wellbore. Reservoir compaction loads increase during the production life of a well, and are greater for deviated wells. Presented here are casing and liner loads at initial and final pressure drawdowns for a particular reservoir and at well deviation angles of 0 to 45 degrees.

Wooley, G.R.; Prachner, W.

1984-09-01T23:59:59.000Z

178

1991 Pacific Northwest Loads and Resources Study.  

SciTech Connect

This study establishes the Bonneville Power Administration's (BPA) planning basis for supplying electricity to BPA customers. The Loads and Resources Study is presented in three documents: (1) this summary of federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates our 1990 study. BPS's long-range planning incorporates resource availability with a range of forecasted electrical consumption. The forecasted future electrical demands-firm loads--are subtracted from the projected capability of existing resources to determine whether BPA and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, then additional conservation, contract purchases, or generating resources will be needed to meet load growth. This study analyzes the Pacific Northwest's projected loads and available generating resources in two parts: (1) the loads and resources of the federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional profile, which includes loads and resources in addition to the federal system. This study presents the federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for 1992- 2012.

United States. Bonneville Power Administration.

1991-12-01T23:59:59.000Z

179

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network (OSTI)

In PJM for example, loads and generators that can follow theto generators and loads, who can follow operator’s second bya reflection of the load’s inability to follow minute-by-

Heffner, Grayson

2008-01-01T23:59:59.000Z

180

Federal Energy Management Program: Energy Management Guidance  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Management Energy Management Guidance to someone by E-mail Share Federal Energy Management Program: Energy Management Guidance on Facebook Tweet about Federal Energy Management Program: Energy Management Guidance on Twitter Bookmark Federal Energy Management Program: Energy Management Guidance on Google Bookmark Federal Energy Management Program: Energy Management Guidance on Delicious Rank Federal Energy Management Program: Energy Management Guidance on Digg Find More places to share Federal Energy Management Program: Energy Management Guidance on AddThis.com... Requirements by Subject Requirements by Regulation Notices & Rules Guidance Facility Reporting Fleet Reporting Energy Management Guidance The Federal Energy Management Program (FEMP) provides guidance on Federal

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Environmental Management Waste Management Facility (EMWMF) at...  

Office of Environmental Management (EM)

Environmental Management Waste Management Facility (EMWMF) at Oak Ridge Environmental Management Waste Management Facility (EMWMF) at Oak Ridge Full Document and Summary Versions...

182

OpenEI Community - load profile  

Open Energy Info (EERE)

/0 en Commercial and /0 en Commercial and Residential Hourly Load Data Now Available on OpenEI! http://en.openei.org/community/blog/commercial-and-residential-hourly-load-data-now-available-openei <span class=Load data" src="http://en.openei.org/community/files/load_data_figure_small.jpg" style="width:527px; height:285px" title="" />Image source: NREL 

Files: 
application/zip icon

183

Building Technologies Office Load Control Strategies  

Energy.gov (U.S. Department of Energy (DOE))

BTO researches and implements load control strategies, which support the Sustainable and Holistic IntegratioN of Energy storage and Solar PV (SHINES) FOA.

184

Discovering and Loading Data with Power Query  

Science Journals Connector (OSTI)

Discovering, loading, cleaning, and modifying source data is where Power Query comes in. Using this, the... Data Discovery—Find and connect to a myriad of data sources ...

Adam Aspin

2014-01-01T23:59:59.000Z

185

A multi-agent platform for auction-based allocation of loads in transportation logistics  

Science Journals Connector (OSTI)

This paper describes an agent-based platform for the allocation of loads in distributed transportation logistics, developed as a collaboration between CWI, Dutch National Center for Mathematics and Computer Science, Amsterdam and Vos Logistics Organizing, ... Keywords: Auction platforms, Human-computer interaction, Multi-agent systems, Software platform, Supply chain management, Transportation logistics

Valentin Robu; Han Noot; Han La Poutré; Willem-Jan van Schijndel

2011-04-01T23:59:59.000Z

186

Distributed Load Demand Scheduling in Smart Grid to Minimize Electricity Generation Cost  

E-Print Network (OSTI)

is to perform demand side management (DSM) [1], which aims at matching the consum- ers' electricity demand between electricity consumption and generation. On the consumption side, electric demand ramps upDistributed Load Demand Scheduling in Smart Grid to Minimize Electricity Generation Cost Siyu Yue

Pedram, Massoud

187

Online Load Balancing for Related Machines 1 (Revised Piotr Berman  

E-Print Network (OSTI)

s as follows: load(s; i) = 1 v i X s(j)=i p j ; Load(s) = max i load(s; i) It is easy to observe that findingOn­line Load Balancing for Related Machines 1 (Revised Version) Piotr Berman The Pennsylvania State of randomized algorithms for this problem. Key Words: on­line algorithm, load balancing, related machines

Karpinski, Marek

188

Definition: Demand Side Management | Open Energy Information  

Open Energy Info (EERE)

Side Management Side Management Jump to: navigation, search Dictionary.png Demand Side Management The term for all activities or programs undertaken by Load-Serving Entity or its customers to influence the amount or timing of electricity they use.[1] View on Wikipedia Wikipedia Definition Energy demand management, also known as demand side management (DSM), is the modification of consumer demand for energy through various methods such as financial incentives and education. Usually, the goal of demand side management is to encourage the consumer to use less energy during peak hours, or to move the time of energy use to off-peak times such as nighttime and weekends. Peak demand management does not necessarily decrease total energy consumption, but could be expected to reduce the need

189

INVESTMENT MANAGEMENT OFFICE MANAGEMENT OFFICE  

E-Print Network (OSTI)

INVESTMENT MANAGEMENT OFFICE INVESTMENT MANAGEMENT OFFICE THE UNIVERSITY OF UTAH University of Utah | Investment Management Office Quarterly Summary The Endowment Pool had a positive first quarter (ending March gain from investments of $7.8 million. The Endowment Pool unit value of $100 has grown to $175 in 10

190

The Promise of Load Balancing the Parameterization of Moist Convection Using a Model Data Load Index  

Science Journals Connector (OSTI)

The parameterization of physical processes in atmospheric general circulation models contributes to load imbalances among individual processors of message-passing distributed-multiprocessor systems. Load imbalances increase the overall time to ...

S. P. Muszala; D. A. Connors; J. J. Hack; G. Alaghband

2006-04-01T23:59:59.000Z

191

Load Forecast For use in Resource Adequacy  

E-Print Network (OSTI)

p g Monthly employment data for 1995-2012 from Bureau of Labor Statistics. H l Di S i I d l d d f Loads 1995-2012 employment 7) Estimate 84 sets of Daily Temperature Sensitive Loads Using 1928 regional employment 8) Adjust for Embedded and Target Conservation amounts Factor s for each day #12;Input

192

Thermionic converter in load-switching mode  

SciTech Connect

An electrical equivalent circuit is proposed for a thermionic electrogenerating element. It is suitable for calculation of transients in load-switching mode. Formulas are given for estimating circuit parameters. A sample numerical calculation is given for the transient between no-load and short-circuit regimes. The results may be employed to identify experimental data in the frequency domain.

Mendel'baum, M.A.; Es'kov, V.D.

1983-01-01T23:59:59.000Z

193

1997 Pacific Northwest Loads and Resources Study.  

SciTech Connect

The 1997 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. Data detailing Pacific Northwest non-utility generating (NUG) resources is also available upon request. This analysis updates the 1996 pacific Northwest Loads and Resources Study, published in December 1996. In this loads and resources study, resource availability is compared with a medium forecast of electricity consumption. This document analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system which includes loads and resources in addition to the Federal system. This study presents the Federal system and regional analyses for the medium load forecast. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1998--99 through 2007--08.

United States. Bonneville Power Administration.

1997-12-01T23:59:59.000Z

194

Effects of dynamic conditions and sheave efficiency on hook load, derrick load, and line tension  

E-Print Network (OSTI)

EFFECTS OF DYNAMIC CONDITIONS AND SHEAVE EFFICIENCY ON HOOK LOAD, DERRICK LOAD, AND LINE TENSION A Thesis by GREGORY ROBERT LUKE Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE May 1991 Major Subject: Petroleum Engineering EFFECTS OF DYNAMIC CONDITIONS AND SHEAVE EFFICIENCY ON HOOK LOAD, DERRICK LOAD, AND LINE TENSION A Thesis by GREGORY ROBERT LUKE Approved as to style and content by: Hans...

Luke, Gregory Robert

1991-01-01T23:59:59.000Z

195

Appears in Computer Architecture Letters, Volume 12 (2010) SMT-Directory: Efficient Load-Load Ordering for SMT  

E-Print Network (OSTI)

-thread "read" bit to every data cache line. When a load executes, it sets the bit corresponding to its threadAppears in Computer Architecture Letters, Volume 12 (2010) SMT-Directory: Efficient Load-Load, TSO, and PC enforce load-load ordering, requiring that loads from any single thread appear to occur

Roth, Amir

196

Energy Management Programs- Monitoring Performance  

E-Print Network (OSTI)

ENERGY MANAGEMENT PROGRAMS - MONITORING PERFORMANCE Stanley P. Pauls Mustafa D. Shamy Merck & Co., Inc. Rahway, N. J. ABSTRACT of the historical energy consumption records. Energy use standards have been established to Steam Model monitor... energy conservation performance in bulk pharmaceutical plants. The model considers The basic steam model for most industrial process, comfort heating, and fixed loads. operations is made up of the following components: As the oil crisis developed...

Pauls, S. P.; Shamy, M. D.

197

Combi Systems for Low Load homes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

text styles text styles Combi Systems for Low Load Homes Center for Energy and Environment, NorthernSTAR, Ben Schoenbauer * Low load homes are more common than ever. * Typical space heating and DHW equipment have capacities larger than necessary * A single heating plant could provide high efficiency heat at lower costs, increased durability and improved combustion safety Context Technical Approach * A condensing water heater and hydronic air handler will used to provide space and water heating loads in almost 300 weatherized homes. * System specifications, sizing, and installation optimization guidelines were all developed. * Contractor capability was developed in MN market, but may not be developed in all local. 4 Recommended Guidance * Determine peak load on system: - Space heating design load (ie 40,000 Btu/hr)

198

Scaling of load in communications networks  

Science Journals Connector (OSTI)

We show that the load at each node in a preferential attachment network scales as a power of the degree of the node. For a network whose degree distribution is p(k)?k??, we show that the load is l(k)?k? with ?=??1, implying that the probability distribution for the load is p(l)?1/l2 independent of ?. The results are obtained through scaling arguments supported by finite size scaling studies. They contradict earlier claims, but are in agreement with the exact solution for the special case of tree graphs. Results are also presented for real communications networks at the IP layer, using the latest available data. Our analysis of the data shows relatively poor power-law degree distributions as compared to the scaling of the load versus degree. This emphasizes the importance of the load in network analysis.

Onuttom Narayan and Iraj Saniee

2010-09-02T23:59:59.000Z

199

Time and Cognitive Load 1 Time and Cognitive Load in Working Memory  

E-Print Network (OSTI)

Time and Cognitive Load 1 Time and Cognitive Load in Working Memory Pierre Barrouillet*, Sophie Bourgogne Running head: Time and Cognitive Load Corresponding author: Pierre Barrouillet Pierre manuscript, published in "Journal of Experimental Psychology: Learning, Memory, and Cognition 33, 3 (2007

Paris-Sud XI, Université de

200

Blinded by the load: attention, awareness and the role of perceptual load  

Science Journals Connector (OSTI)

...while including novel data that demonstrate...between perceptual load and the fundamental...effects of perceptual load on visual detection...response gain, the data from each participant...Konstantinou, N. 2014 Data from: blinded by the load: attention, awareness...

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Federal Energy Management Program: Computerized Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Computerized Maintenance Management Systems to someone by E-mail Share Federal Energy Management Program: Computerized Maintenance Management Systems on Facebook Tweet about Federal Energy Management Program: Computerized Maintenance Management Systems on Twitter Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Google Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Delicious Rank Federal Energy Management Program: Computerized Maintenance Management Systems on Digg Find More places to share Federal Energy Management Program: Computerized Maintenance Management Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

202

LRRB Pavement Management Systems Pavement Management Systems  

E-Print Network (OSTI)

LRRB Pavement Management Systems Pavement Management Systems Presented by: Michael Marti SRF for implementing and monitoring research results (RIC) #12;LRRB Pavement Management Systems LRRB Structure LRRB Current Pavement Management System Used ICON (Goodpointe) Year of Pavement Management System

Minnesota, University of

203

Variability of Load and Net Load in Case of Large Scale Distributed Wind Power  

SciTech Connect

Large scale wind power production and its variability is one of the major inputs to wind integration studies. This paper analyses measured data from large scale wind power production. Comparisons of variability are made across several variables: time scale (10-60 minute ramp rates), number of wind farms, and simulated vs. modeled data. Ramp rates for Wind power production, Load (total system load) and Net load (load minus wind power production) demonstrate how wind power increases the net load variability. Wind power will also change the timing of daily ramps.

Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Gomez-Lazaro, E.; Rawn, B.; Dobschinski, J.; Meibom, P.; Lannoye, E.; Aigner, T.; Wan, Y. H.; Milligan, M.

2011-01-01T23:59:59.000Z

204

SUBCONTRACT MANAGEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-1 -1 CHAPTER 10 SUBCONTRACT MANAGEMENT (Revised October 19, 2011) WHAT ARE THE BASIC PRINCIPLES AND OBJECTIVES OF SUBCONTRACT MANAGEMENT? 1. To ensure contractors establish, document, and maintain adequate purchasing systems. 2. To ensure contractors flow down contract requirements to subcontractors. WHY IS SUBCONTRACT MANAGEMENT IMPORTANT? In many Department prime contracts a significant portion of the obligated dollars is spent on subcontract work. Due to the absence of a direct contractual relationship with the subcontractor, the Department must rely on the prime contractor to manage subcontract work. Subcontractors perform significant work efforts at sites and are an integral part of the site's success. Prime

205

Program Manager  

Energy.gov (U.S. Department of Energy (DOE))

A successful candidate in this position will participate in a wide spectrum of program and project management activities involving systems engineering and integration support for Defense Programs...

206

Water Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Water Management This department applies multi-disciplinary science and technology-based modeling to assess complex environmental systems. It integrates ecology, anthropology, and...

207

Position Management  

Directives, Delegations, and Requirements

The order prescribes the policies, responsibilities, and procedures for position management within (DOE). Canceled by DOE N 1321.140. Cancels DOE 3510.1

1992-06-23T23:59:59.000Z

208

MANAGEMENT (MNG)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and recommendations is adequately implemented. (DOE Order 414.1A, Criterion 3; 10 CFR 830, Subpart A) Approach Record Review * Review the SWS issues management systems and...

209

Dehumidification and cooling loads from ventilation air  

SciTech Connect

The importance of controlling humidity in buildings is cause for concern, in part, because of indoor air quality problems associated with excess moisture in air-conditioning systems. But more universally, the need for ventilation air has forced HVAC equipment (originally optimized for high efficiency in removing sensible heat loads) to remove high moisture loads. To assist cooling equipment and meet the challenge of larger ventilation loads, several technologies have succeeded in commercial buildings. Newer technologies such as subcool/reheat and heat pipe reheat show promise. These increase latent capacity of cooling-based systems by reducing their sensible capacity. Also, desiccant wheels have traditionally provided deeper-drying capacity by using thermal energy in place of electrical power to remove the latent load. Regardless of what mix of technologies is best for a particular application, there is a need for a more effective way of thinking about the cooling loads created by ventilation air. It is clear from the literature that all-too-frequently, HVAC systems do not perform well unless the ventilation air loads have been effectively addressed at the original design stage. This article proposes an engineering shorthand, an annual load index for ventilation air. This index will aid in the complex process of improving the ability of HVAC systems to deal efficiently with the amount of fresh air the industry has deemed useful for maintaining comfort in buildings. Examination of typical behavior of weather shows that latent loads usually exceed sensible loads in ventilation air by at least 3:1 and often as much as 8:1. A designer can use the engineering shorthand indexes presented to quickly assess the importance of this fact for a given system design. To size those components after they are selected, the designer can refer to Chapter 24 of the 1997 ASHRAE Handbook--Fundamentals, which includes separate values for peak moisture and peak temperature.

Harriman, L.G. III [Mason-Grant, Portsmouth, NH (United States); Plager, D. [Quantitative Decision Support, Portsmouth, NH (United States); Kosar, D. [Gas Research Inst., Chicago, IL (United States)

1997-11-01T23:59:59.000Z

210

Mean and peak wind loads on heliostats  

SciTech Connect

Mean and peak wind loads on flat rectangular or circular heliostats were measured on models in a boundary layer wind tunnel which included an atmospheric surface layer simulation. Horizontal and vertical forces, moments about horizontal axes at the ground level and at the centerline of the heliostat, and the moment about the vertical axis through the heliostat center were measured. Results showed that loads are higher than predicted from results obtained in a uniform, low-turbulence flow due to the presence of turbulence. Reduced wind loads were demonstrated for heliostats within a field of heliostats and upper bound curves were developed to provide preliminary design coefficients.

Peterka, J.A.; Tan, Z.; Cermak, J.E.; Bienkiewicz, B.

1989-05-01T23:59:59.000Z

211

Synthesis of polyoxometalate-loaded epoxy composites  

DOE Patents (OSTI)

The synthesis of a polyoxometalate-loaded epoxy uses a one-step cure by applying an external stimulus to release the acid from the polyoxometalate and thereby catalyze the cure reaction of the epoxy resin. Such polyoxometalate-loaded epoxy composites afford the cured epoxy unique properties imparted by the intrinsic properties of the polyoxometalate. For example, polyoxometalate-loaded epoxy composites can be used as corrosion resistant epoxy coatings, for encapsulation of electronics with improved dielectric properties, and for structural applications with improved mechanical properties.

Anderson, Benjamin J

2014-10-07T23:59:59.000Z

212

Definition: Base Load | Open Energy Information  

Open Energy Info (EERE)

Load Load Jump to: navigation, search Dictionary.png Base Load The minimum amount of electric power delivered or required over a given period at a constant rate.[1] View on Wikipedia Wikipedia Definition Baseload (also base load, or baseload demand) is the minimum amount of power that a utility or distribution company must make available to its customers, or the amount of power required to meet minimum demands based on reasonable expectations of customer requirements. Baseload values typically vary from hour to hour in most commercial and industrial areas. Related Terms electricity generation, power, smart grid References ↑ Glossary of Terms Used in Reliability Standards An in Like Like You like this.Sign Up to see what your friends like. line Glossary Definition Retrieved from

213

S-Band Loads for SLAC Linac  

SciTech Connect

The S-Band loads on the current SLAC linac RF system were designed, in some cases, 40+ years ago to terminate 2-3 MW peak power into a thin layer of coated Kanthal material as the high power absorber [1]. The technology of the load design was based on a flame-sprayed Kanthal wire method onto a base material. During SLAC linac upgrades, the 24 MW peak klystrons were replaced by 5045 klystrons with 65+ MW peak output power. Additionally, SLED cavities were introduced and as a result, the peak power in the current RF setup has increased up to 240 MW peak. The problem of reliable RF peak power termination and RF load lifetime required a careful study and adequate solution. Results of our studies and three designs of S-Band RF load for the present SLAC RF linac system is discussed. These designs are based on the use of low conductivity materials.

Krasnykh, A.; Decker, F.-J.; /SLAC; LeClair, R.; /INTA Technologies, Santa Clara

2012-08-28T23:59:59.000Z

214

Advancements in rapid load test data regression.  

E-Print Network (OSTI)

??Rate-dependent effects introduced during rapid and/or dynamic events have typically been oversimplified to compensate for deficiencies in present analyses. As load test results are generally… (more)

Stokes, Michael Jeffrey

2006-01-01T23:59:59.000Z

215

AMTEC Response to Changes in Resistive Loading  

Science Journals Connector (OSTI)

An important aspect of electric power supply systems is their inherent response time to rapid changes in loading demands. This presentation reviews the experimental response of an Alkali Metal Thermal Electric Converter (AMTEC) system when switched from open circuit to stable resistive loads. Our data show a nominal 35?Watt AMTEC converter responded rapidly throughout the power curve. Response times from open circuit to delivering 90% of peak DC current were within 0.25 milliseconds to 0.85 milliseconds for a range of electrically resistive loads at several typical AMTEC operational temperatures. Such response times to load changes suggest that AMTEC may be suitable as a primary power supply or backup power supply for critical space applications.

Robert W. Fletcher; Thomas K. Hunt

2003-01-01T23:59:59.000Z

216

DEACTIVATION MANAGEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT MANAGEMENT The purpose here is to provide information for specific aspects of project management that apply to deactivation. Overall management of deactivation projects should use a traditional project management approach, and as such is not addressed. The following specific topics are based on lessons learned during deactivation of DOE facilities.  The Deactivation Mission  The Stabilization/Deactivation "Customer"  Project Approach for a Complex Facility  Establishing the Overall End-State  Viewing Deactivation in Two Phases  Early Decisions  Early Deactivation Tasks  Facility-Specific Commitments  Hazard Reduction  Detailed End-Points  Set Up Method and Criteria  Post-Deactivation S&M Plan

217

Reducing Cache Traffic and Energy with Macro Data Load  

E-Print Network (OSTI)

Reducing Cache Traffic and Energy with Macro Data Load Lei Jin Sangyeun Cho Department of Computer data load, an efficient mechanism to enhance loaded value reuse. A macro data load brings (MVRT) shows the significantly increased reuse opportunities provided by macro data load. We also

Cho, Sangyeun

218

Load apparatus and method for bolt-loaded compact tension test specimen  

DOE Patents (OSTI)

A bolt-loaded compact tension test specimen load apparatus includes: (a) a body having first and second opposing longitudinal ends, the first end comprising an externally threaded portion sized to be threadedly received within the test specimen threaded opening; (b) a longitudinal loading rod having first and second opposing longitudinal ends, the loading rod being slidably received in a longitudinal direction within the body internally through the externally threaded portion and slidably extending longitudinally outward of the body first longitudinal end; (c) a force sensitive transducer slidably received within the body and positioned to engage relative to the loading rod second longitudinal end; and (d) a loading bolt threadedly received relative to the body, the loading bolt having a bearing end surface and being positioned to bear against the transducer to forcibly sandwich the transducer between the loading bolt and loading rod. Also disclosed is a method of in situ determining applied force during crack propagation in a bolt-loaded compact tension test specimen. 6 figs.

Buescher, B.J. Jr.; Lloyd, W.R.; Ward, M.B.; Epstein, J.S.

1997-02-04T23:59:59.000Z

219

Load apparatus and method for bolt-loaded compact tension test specimen  

DOE Patents (OSTI)

A bolt-loaded compact tension test specimen load apparatus includes: a) a body having first and second opposing longitudinal ends, the first end comprising an externally threaded portion sized to be threadedly received within the test specimen threaded opening; b) a longitudinal loading rod having first and second opposing longitudinal ends, the loading rod being slidably received in a longitudinal direction within the body internally through the externally threaded portion and slidably extending longitudinally outward of the body first longitudinal end; c) a force sensitive transducer slidably received within the body and positioned to engage relative to the loading rod second longitudinal end; and d) a loading bolt threadedly received relative to the body, the loading bolt having a bearing end surface and being positioned to bear against the transducer to forcibly sandwich the transducer between the loading bolt and loading rod. Also disclosed is a method of in situ determining applied force during crack propagation in a bolt-loaded compact tension test specimen.

Buescher, Jr., Brent J. (Idaho Falls, ID); Lloyd, W. Randolph (Idaho Falls, ID); Ward, Michael B. (Idaho Falls, ID); Epstein, Jonathan S. (Idaho Falls, ID)

1997-01-01T23:59:59.000Z

220

BachelorofManagement InternationalManagement  

E-Print Network (OSTI)

on the official transcript (see Part 11 - Faculty of Management in the 2007/2008 Calendar). Program Planning Guide Management 3050/Political Science 3420 - Human Resource Management Management 3061 - Information Systems Environment Management 3640 - Cross-Cultural Management Practices Management 3660/Geography 3225 - Industrial

Seldin, Jonathan P.

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Examining Repository Loading Options to Expand Yucca Mountain Repository Capacity  

SciTech Connect

Siting a high level nuclear waste repository entails high economic, social, and political costs. Given the difficulty in siting the Yucca Mountain repository and the already identified need for additional capacity, the concept of expanding the capacity of the Yucca Mountain repository is of significant interest to the nuclear industry and the Department of Energy (DOE). As the capacity of the repository is limited by the decay heat inventory of the spent nuclear fuel in relation to the thermal design limits, expanding the capacity requires appropriate schemes for decay heat and spent fuel loading management. The current Yucca Mountain repository is based on a single level, fixed drift spacing design for a fixed area or footprint. Studies performed to date investigating the capacity of Yucca Mountain often assume that the loading of spent fuel is uniform throughout the repository and use the concept of a linear loading or areal power density (APD). However, use of linear loading or APD can be problematic with the various cooling times involved. The temperature within the repository at any point in time is controlled by the integral of the heat deposited in the repository. The integral of the decay heat varies as a function of pre-loading cooling periods even for a fixed linear loading. A meaningful repository capacity analysis requires the use of a computer model that describes the time-dependent temperature distributions of the rock from the dissipation of the heat through the repository system. If variations from the current Yucca Mountain repository design were to be considered, expanding the capacity of the repository would be pursued in several ways including: (1) increase the footprint size; (2) implement multiple-levels in the repository for the given footprint; (3) allow the drift distance to vary within thermal limits; and, (4) allow non-uniform loading of wastes into the drifts within thermal limits. Options (1) and (2) have been investigated by other researchers. This paper investigates options (3) and (4) for possible expansion of the Yucca Mountain repository capacity. To support the work, a thermal analysis model was needed to describe the temperature changes in the rock around the waste packages against the thermal design limits as a function of spent fuel characteristics and composition. Under the high temperature operating mode (HTOM), the relevant thermal design limits are: (1) the rock temperature midway between adjacent drifts must remain below the local boiling point (96 deg. C); and (2) the rock temperature at drift walls must remain below 200 deg. C. As the work involves a large number of calculations, examining the compliance within thermal design limits, the capability to perform efficient mountain-scale heat-transfer analyses was necessary. A related topic of importance in this investigation was also the effect of uncertainty. As the modeling exercise relies on the use of computational models, uncertainties are unavoidable and understanding the uncertainty in the interpretation of the results is important. The concept of variable drift spacing and variable drift thermal loading was investigated with respect to possible capacity expansion of the Yucca Mountain repository. Also, a computer model was developed for efficient repository heat transfer calculations and sensitivity and uncertainty analyses were performed to identify key parameters and to estimate the uncertainty in the results and understand how the repository capacity estimation would be affected by the uncertainty. (authors)

Li, Jun; Nicholson, Mark; Proctor, W. Cyrus; Yim, Man-Sung; McNelis, David [Department of Nuclear Engineering, North Carolina State University (United States)

2007-07-01T23:59:59.000Z

222

2012 CERTS R&M Peer Review - Summary: A Business Model for Retail Aggregation of Responsive Load - Shmuel Oren  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Retail Aggregation of Responsive Load to Produce Wholesale Retail Aggregation of Responsive Load to Produce Wholesale Demand Side Resources Project Lead: Shmuel Oren Objectives The project seeks to develop methods for assembling, managing, and valuing complementary portfolios of variable or intermittent power sources and applications, such as load curtailment, load shifting, renewable resources (wind, solar) and distributed storage (e.g., EV and PHEV batteries, UPS devices etc.). Aggregators can assemble portfolios of such resources to obtain wholesale resources that can be offered in the various ISO markets and exploit the complimentary aspects of these resources through portfolio structuring and dispatch strategies to mitigate the intermittent nature of load response and renewables. Variability can be further reduced by pooling uncertain retail

223

Management Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Immobilization Research Immobilization Research Kurt Gerdes U.S. DOE, Office of Engineering and Technology John Vienna Pacific Northwest National Laboratory Environmental Management May 19, 2009 2009 Hanford - Idaho - Savannah River Technical Exchange 2 Objectives Perform research and development to advance the waste stabilization technology options by through closely- coupled theory, experimentation, and modeling Develop solutions for Hanford, Idaho, Savannah River, and Oak Ridge wastes challenges (along with facilitating management of future wastes) Environmental Management General Approach Balance between near-term incremental technology improvements and long-term transformational solutions Address the requirements for high risk waste streams - high-level tank waste (RPP, SRS)

224

Power System Load Forecasting Based on EEMD and ANN  

Science Journals Connector (OSTI)

In order to fully mine the characteristics of load data and improve the accuracy of power system load forecasting, a load forecasting model based on Ensemble Empirical Mode ... is proposed in this paper. Firstly,...

Wanlu Sun; Zhigang Liu; Wenfan Li

2011-01-01T23:59:59.000Z

225

Effect of palladium loaded activated carbons on hydrogen storage  

Science Journals Connector (OSTI)

Pd-loaded high surface area activated carbon (BAC-Pd) was produced from bamboo by carbonization and activation using potassium hydroxide with subsequent loading of palladium. The palladium loaded onto BACs appear...

Masaki Ohno; Nami Okamura; Tomohiro Kose; Takashi Asada…

2012-12-01T23:59:59.000Z

226

General solutions for thermopiezoelectrics with various holes under thermal loading  

E-Print Network (OSTI)

induced by thermal loads. The loads may be uniform remote heat ¯ow, point heat source and temperature elastic plate with an hole of various shapes subjected to remote uniform mechanical loading. For plane

Qin, Qinghua

227

Using Whole-Building Electric Load Data in Continuous or Retro-Commissioning  

SciTech Connect

Whole-building electric load data can often reveal problems with building equipment or operations. In this paper, we present methods for analyzing 15-minute-interval electric load data. These methods allow building operators, energy managers, and commissioning agents to better understand a building's electricity consumption over time and to compare it to other buildings, helping them to 'ask the right questions' to discover opportunities for electricity waste elimination, energy efficiency, peak load management, and demand response. For example: Does the building use too much energy at night, or on hot days, or in the early evening? Knowing the answer to questions like these can help with retro-commissioning or continuous commissioning. The methods discussed here can also be used to assess how building energy performance varies with time. Comparing electric load before and after fixing equipment or changing operations can help verify that the fixes have the intended effect on energy consumption. Analysis methods discussed in this paper include: ways to graphically represent electric load data; the definition of various parameters that characterize facility electricity loads; and a regression-based electricity load model that accounts for both time of week and outdoor air temperature. The methods are illustrated by applying them to data from commercial buildings. We demonstrate the ability to recognize changes in building operation, and to quantify changes in energy performance. Some key findings are: 1) Plotting time series electric load data is useful for understanding electricity consumption patterns and changes to those patterns, but results may be misleading if data from different time intervals are not weather-normalized. 2) Parameter plots can highlight key features of electric load data and may be easier to interpret than plots of time series data themselves. 3) A time-of-week indicator variable (as compared to time-of-day and day-of-week indicator variables) improves the accuracy of regression models of electric load. 4) A piecewise linear and continuous outdoor air temperature dependence can be derived without the use of a change-point model (which would add complexity to the modeling algorithm) or assumptions about when structural changes occur (which could introduce inaccuracy). 5) A model that includes time-of-week and temperature dependence can be used for weather normalization and can determine whether the building is unusually temperature-sensitive, which can indicate problems with HVAC operation.

Price, Phillip N.; Mathieu, Johanna L.; Kiliccote, Sila; Piette, Mary Ann

2011-07-01T23:59:59.000Z

228

ALLIANCE MANAGEMENT  

Science Journals Connector (OSTI)

In the last two decades, production and manufacturing management has rapidly adopted a range of new concepts: manufacturing strategy, focused factory, just-in-time manufacturing, concurrent engineering, total ...

2000-01-01T23:59:59.000Z

229

Local Soot Loading Distribution in Cordierite Diesel Particulate...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Local Soot Loading Distribution in Cordierite Diesel Particulate Filters by Dynamic Neutron Radiography Local Soot Loading Distribution in Cordierite Diesel Particulate Filters by...

230

Thermal Cycling Combined with Dynamic Mechanical Load: Preliminary...  

Office of Environmental Management (EM)

Load: Preliminary Report This PowerPoint presentation summarizes the efforts of the team led by ESPEC Corp. to investigate thermal cycling combined with dynamic mechanical load, a...

231

Characterization of Dynamic Loads on Solar Modules with Respect...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Characterization of Dynamic Loads on Solar Modules with Respect to Fracture of Solar Cells Characterization of Dynamic Loads on Solar Modules with Respect to Fracture of Solar...

232

The Development of a Small Engine Based Accelerated Ash Loading...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Accelerated Ash Loading Protocol The Development of a Small Engine Based Accelerated Ash Loading Protocol Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan....

233

Transmission Reliability "Load as a Resource" Peer Review Materials...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Reliability "Load as a Resource" Peer Review Materials Now Available Transmission Reliability "Load as a Resource" Peer Review Materials Now Available September 25,...

234

Used Nuclear Fuel Loading and Structural Performance Under Normal...  

Office of Environmental Management (EM)

Used Nuclear Fuel Loading and Structural Performance Under Normal Conditions of Transport - Modeling, Simulation and Experimental Integration RD&D Plan Used Nuclear Fuel Loading...

235

Generation of synthetic benchmark electrical load profiles using publicly available load and weather data  

Science Journals Connector (OSTI)

Abstract Electrical load profiles of a particular region are usually required in order to study the performance of renewable energy technologies and the impact of different operational strategies on the power grid. Load profiles are generally constructed based on measurements and load research surveys which are capital and labour-intensive. In the absence of true load profiles, synthetically generated load profiles can be a viable alternative to be used as benchmarks for research or renewable energy investment planning. In this paper, the feasibility of using publicly available load and weather data to generate synthetic load profiles is investigated. An artificial neural network (ANN) based method is proposed to synthesize load profiles for a target region using its typical meteorological year 2 (TMY2) weather data as the input. To achieve this, the proposed ANN models are first trained using TMY2 weather data and load profile data of neighbouring regions as the input and targeted output. The limited number of data points in the load profile dataset and the consequent averaging of TMY2 weather data to match its period resulted in limited data availability for training. This challenge was tackled by incorporating generalization using Bayesian regularization into training. The other major challenge was facilitating ANN extrapolation and this was accomplished by the incorporation of domain knowledge into the input weather data for training. The performance of the proposed technique has been evaluated by simulation studies and tested on three real datasets. Results indicate that the generated synthetic load profiles closely resemble the real ones and therefore can be used as benchmarks.

Gobind G. Pillai; Ghanim A. Putrus; Nicola M. Pearsall

2014-01-01T23:59:59.000Z

236

A comparison of measured wind park load histories with the WISPER and WISPERX load spectra  

SciTech Connect

The blade-loading histories from two adjacent Micon 65/13 wind turbines are compared with the variable-amplitude test-loading histories known as the WISPER and WISPERX spectra. These standardized loading sequences were developed from blade flapwise load histories taken from nine different horizontal-axis wind turbines operating under a wide range of conditions in Europe. The subject turbines covered a broad spectrum of rotor diameters, materials, and operating environments. The final loading sequences were developed as a joint effort of thirteen different European organizations. The goal was to develop a meaningful loading standard for horizontal-axis wind turbine blades that represents common interaction effects seen in service. In 1990, NREL made extensive load measurements on two adjacent Micon 65/13 wind turbines in simultaneous operation in the very turbulent environment of a large wind park. Further, before and during the collection of the loads data, comprehensive measurements of the statistics of the turbulent environment were obtained at both the turbines under test and at two other locations within the park. The trend to larger but lighter wind turbine structures has made an understanding of the expected lifetime loading history of paramount importance. Experience in the US has shown that the turbulence-induced loads associated with multi-row wind parks in general are much more severe than for turbines operating individually or within widely spaced environments. Multi-row wind parks are much more common in the US than in Europe. In this paper we report on our results in applying the methodology utilized to develop the WISPER and WISPERX standardized loading sequences using the available data from the Micon turbines. While the intended purpose of the WISPER sequences were not to represent a specific operating environment, we believe the exercise is useful, especially when a turbine design is likely to be installed in a multi-row wind park.

Kelley, N.D.

1995-01-01T23:59:59.000Z

237

An energy-efficient adaptive clustering algorithm with load balancing for wireless sensor network  

Science Journals Connector (OSTI)

Maximisation of network lifetime is the issue of prime importance in Wireless Sensor Network (WSN). An energy-efficient clustering algorithm with load balancing can achieve this challenging goal. We propose Density-based Dynamic Clustering (DDC) algorithm for clustering and cluster head election mechanism with the use of independence set. Furthermore, a distributed algorithm (DISD - Distributed Independence Set Discovery) is designed for cluster head election in O(1) complexity per sensor node. In this, we dynamically find an optimal sensor cover to dominate maximum sensors within a cluster, therefore forming an InDependence Set (IDS). Only the members of IDS are allowed to participate in the cluster head selection (rotation), thereby establishing load balancing and energy management. Our model is designed for dual modes: low- and high-traffic session. According to the flow of packets, the sleep management technique is modified. Network simulator is used for the simulation of our proposed algorithms.

Buddha Singh; D.K. Lobiyal

2012-01-01T23:59:59.000Z

238

Sonic Load History Recorder. I. Feasibility Study  

Science Journals Connector (OSTI)

The acoustic loads to which an aircraft is subjected during its lifetime must be known for structural?fatigue analysis in aircraft design. The Sonic Load History Recorder senses filters smooths and records some measure of the length of time the sound pressure has spent in a given level band. Sound?pressure?level distributions over long periods of time are calculated for a present?day aircraft from engine?operating parameters operational characteristics of the aircraft and from ambient atmospheric conditions. The requirements for a device which is designed to provide a useful description of acoustic loads at a point on an operational aircraft are developed on the basis of the SPL histories and fatigue criteria. [This work was supported under U. S. Air Force Contract AF 33(616)?7789.

N. Doelling; D. Noiseux

1962-01-01T23:59:59.000Z

239

Independent review of estimated load reductions for PJM's small customer load response pilot project  

E-Print Network (OSTI)

water heater (EWH) load control program operated as part of PJM Interconnection’s Demand ResponseDemand Response Economic and Emergency Load Response Programs Electric Thermal Storage Electric Water Heaterwater pumps and electric thermal storage space heaters. The CSP is also participating in PJM’s pilot Demand Response

Heffner, G.; Moezzi, M.; Goldman, C.

2004-01-01T23:59:59.000Z

240

Reconstruction of a wind turbine's endured load spectrum using a short-time load measurement  

E-Print Network (OSTI)

Reconstruction of a wind turbine's endured load spectrum using a short-time load measurement Abstract Wind turbines (WT) are normally designed for a service life (SL) of 20 years. In Germany, over safety. 1 Introduction A wind turbine (WT) is normally designed, tested and certified for a design life

Berlin,Technische Universität

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Modality Effects on Cognitive Load and Performance in High-Load Information Presentation  

E-Print Network (OSTI)

INTRODUCTION Intelligent human-computer interfaces are often multimodal, i.e. the human-computer communications into the modality planning procedure for systems that support high-load human-computer interaction. Author Keywords-load information presenta- tion scenario. Mainly based on modality-related psychology theories, we selected five

Theune, Mariët

242

Federal Emergency Management Information system (FEMIS) data management guide. Version 1.2  

SciTech Connect

The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Chemical and Biological Defense Command. The FEMIS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain the data resources in the system. Database administrators, system administrators, and general users can use this guide to manage the data files and database that support the administrative, user-environment, database management, and operational capabilities of FEMIS. This document provides a description of the relational and spatial information present in FEMIS. It describes how the data was assembled, how it is loaded, and how it is managed while the system is in operation.

Burnett, R.A.; Downing, T.R.; Gaustad, K.L.; Johnson, S.M.; Loveall, R.M.; Winters, C.

1996-05-01T23:59:59.000Z

243

Managing the Management: CORBAbased Instrumentation of Management Systems  

E-Print Network (OSTI)

Management Team Department of Computer Science, TU MË? unchen Arcisstr. 21, D­80333 Munich, Germany akeller approach to this problem by defining a MIB for manage­ ment systems. It can be regarded as a step towardsManaging the Management: CORBA­based Instrumentation of Management Systems A. Keller Munich Network

244

On-line Load Balancing for Related Machines 1 Piotr Berman  

E-Print Network (OSTI)

s and Load(s), the load of entire schedule s as follows: load(s;i) = 1 vi X s(j)=i pj; Load(s) = maxi loadOn-line Load Balancing for Related Machines 1 (Revised Version) Piotr Berman The Pennsylvania State for this problem. Key Words: on-line algorithm, load balancing, related machines, competitive ratio 1A preliminary

Eckmiller, Rolf

245

Duet: Cloud Scale Load Balancing with Hardware and Rohan Gandhi  

E-Print Network (OSTI)

that scale using a distributed data plane that runs on commodity servers. Software load balancers offer low overlooked resource in the data center networks � the switches themselves. We show how to embed the load-DC traffic. This traffic volume induces heavy load on both data plane and control plane of the load balancer

Zhang, Ming

246

Randomized Load Balancing by Joining and Splitting Bins James Aspnes  

E-Print Network (OSTI)

Consider the following load balancing scenario: a certain amount of work load is distributed among a setRandomized Load Balancing by Joining and Splitting Bins James Aspnes Yitong Yin § 1 Introduction, one of the existing machines gives some of its load to the new machine; and upon a departure

Aspnes, James

247

Stochastic service load simulation for engineering structures  

Science Journals Connector (OSTI)

...at the design stage of an engineering structure, both global and...is relevant to other core engineering industry sectors. This paper...simulated Jack-up offshore load history (JOSH) developed for use...fatigue|fracture mechanics|engineering structures|

2001-01-01T23:59:59.000Z

248

Economic load dispatch using improved harmony search  

Science Journals Connector (OSTI)

This paper presents the use of the improved harmony search method for solving economic load dispatch problems. The harmony search method mimics a jazz improvisation process by musicians in order to seek a fantastic state of harmony. To assess the searching ... Keywords: adaptive tabu search, economic dispatch, evolutionary programming, genetic algorithms, particle swarm optimization

T. Ratniyomchai; A. Oonsivilai; P. Pao-La-Or; T. Kulworawanichpong

2010-04-01T23:59:59.000Z

249

Load Tilt and Body Tilt at Bidston  

Science Journals Connector (OSTI)

......to Tidal Load,Memoirs of the Imperial Marine Observatory, 1, No. 1, 1922 June...that the possibilities of error due to wear in the cone and cup should be made known...1932 September. Memoirs of the Imperial Marine Observatory, I, No. I, 1922June. the......

A. T. Doodson; R. H. Corkan

1934-05-01T23:59:59.000Z

250

1995 Pacific Northwest Loads and Resources Study.  

SciTech Connect

The study establishes the planning basis for supplying electricity to customers. The study presents projections of regional and Federal system load and resource capabilities, and serves as a benchmark for annual BPA determinations made pursuant to the 1981 regional power sales contracts.

United States. Bonneville Power Administration.

1995-12-01T23:59:59.000Z

251

Valve for fuel pin loading system  

DOE Patents (OSTI)

A cyclone valve surrounds a wall opening through which cladding is projected. An axial valve inlet surrounds the cladding. Air is drawn through the inlet by a cyclone stream within the valve. An inflatable seal is included to physically engage a fuel pin subassembly during loading of fuel pellets.

Christiansen, D.W.

1984-01-01T23:59:59.000Z

252

Valve for fuel pin loading system  

DOE Patents (OSTI)

A cyclone valve surrounds a wall opening through which cladding is projected. An axial valve inlet surrounds the cladding. Air is drawn through the inlet by a cyclone stream within the valve. An inflatable seal is included to physically engage a fuel pin subassembly during loading of fuel pellets.

Christiansen, David W. (Kennewick, WA)

1985-01-01T23:59:59.000Z

253

14 IEEE TRANSACTIONS ON POWER ELECTRONICS, VOL. 24, NO. 1, JANUARY 2009 Multiple-LoadSource Integration in a Multilevel  

E-Print Network (OSTI)

a power management system among multiple sources and loads having dif- ferent operating voltages. Index- tional dc­dc converter is a key element to provide the power for the electrical drive train in future14 IEEE TRANSACTIONS ON POWER ELECTRONICS, VOL. 24, NO. 1, JANUARY 2009 Multiple

Tolbert, Leon M.

254

Managing Solutions  

E-Print Network (OSTI)

tx H2O | pg. 19 Texas Water Resources Institute (TWRI) project managers work together with scientists and educators as well as government funding agencies to address water quality and quantity issues in Texas. Each of TWRI?s five project... the funds.? Gregory began his role at TWRI in 2006 upon com- pletion of a master?s degree in water management and hydrological science at Texas A&M University. A former Mills Scholar, Gregory was familiar with TWRI. He saw that the institute...

Baker, Emily

2007-01-01T23:59:59.000Z

255

Building America Case Study: Advanced Boiler Load Monitoring Controllers, Chicago, Illinois (Fact Sheet)  

SciTech Connect

Beyond these initial system efficiency upgrades are an emerging class of Advanced Load Monitoring (ALM) aftermarket controllers that dynamically respond to the boiler load, with claims of 10% to 30% of fuel savings over a heating season. For hydronic boilers specifically, these devices perform load monitoring, with continuous measurement of supply and in some cases return water temperatures. Energy savings from these ALM controllers are derived from dynamic management of the boiler differential, where a microprocessor with memory of past boiler cycles prevents the boiler from firing for a period of time, to limit cycling losses and inefficient operation during perceived low load conditions. These differ from OTR controllers, which vary boiler setpoint temperatures with ambient conditions while maintaining a fixed differential. PARR installed and monitored the performance of one type of ALM controller, the M2G from Greffen Systems, at multifamily sites in the city of Chicago and its suburb Cary, IL, both with existing OTR control. Results show that energy savings depend on the degree to which boilers are over-sized for their load, represented by cycling rates. Also savings vary over the heating season with cycling rates, with greater savings observed in shoulder months. Over the monitoring period, over-sized boilers at one site showed reductions in cycling and energy consumption in line with prior laboratory studies, while less over-sized boilers at another site showed muted savings.

PARR

2014-09-01T23:59:59.000Z

256

Independent review of estimated load reductions for PJM's small customer load response pilot project  

SciTech Connect

This study describes the results of a low-cost approach used to measure reported load reductions from a residential electric water heater (EWH) load control program operated as part of PJM Interconnection's Demand Response small customer pilot program. Lawrence Berkeley National Laboratory (LBNL) conducted this independent review of the engineering estimates for EWH load control reported by a Curtailment Service Provider (CSP) at PJM's request. LBNL employed low-cost measurement and verification (M&V) approaches that utilized existing interval metering equipment to monitor results for a series of load control tests. The CSP collected hourly load data for two substations and several hundred households over a six-week period in October and November 2003. During this time period, the CSP operated its electric water heater load control program during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems signifiogram during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems significantly limit our ability to differentiate between control-related and non-control related differences in substation-level load shape data. The usefulness and accuracy of the results were hampered by operational problems encountered during the measurement period as well as in sufficient number of load research grade interval meters at one cooperative. Given the larger sample size at one electric cooperative and more statistically-robust results, there is some basis to suggest that the Adjusted Diversified Demand Factor (ADDF) values used by the CSP somewhat over-state the actual load reductions. Given the results and limitations of the M&V approach as implemented, we suggest several options for PJM to consider: (1) require load aggregators participating in ISODR programs to utilize formal PURPA-compliant load research samples in their M&V plans, and (2) continue developing lower cost M&V approaches for mass market load control programs that incorporate suggested improvements described in this study.

Heffner, G.; Moezzi, M.; Goldman, C.

2004-06-01T23:59:59.000Z

257

End-use load control for power system dynamic stability enhancement  

SciTech Connect

Faced with the prospect of increasing utilization of the transmission and distribution infrastructure without significant upgrade, the domestic electric power utility industry is investing heavily in technologies to improve network dynamic performance through a program loosely referred to as Flexible AC Transmission System (FACTS). Devices exploiting recent advances in power electronics are being installed in the power system to offset the need to construct new transmission lines. These devices collectively represent investment potential of several billion dollars over the next decade. A similar development, designed to curtail the peak loads and thus defer new transmission, distribution, and generation investment, falls under a category of technologies referred to as demand side management (DSM). A subset of broader conservation measures, DSM acts directly on the load to reduce peak consumption. DSM techniques include direct load control, in which a utility has the ability to curtail specific loads as conditions warrant. A novel approach has been conceived by Pacific Northwest National Laboratory (PNNL) to combine the objectives of FACTS and the technologies inherent in DSM to provide a distributed power system dynamic controller. This technology has the potential to dramatically offset major investments in FACTS devices by using direct load control to achieve dynamic stability objectives. The potential value of distributed versus centralized grid modulation has been examined by simulating the western power grid under extreme loading conditions. In these simulations, a scenario is analyzed in which active grid stabilization enables power imports into the southern California region to be increased several hundred megawatts beyond present limitations. Modeling results show distributed load control is up to 30 percent more effective than traditional centralized control schemes in achieving grid stability.

Dagle, J.E.; Winiarski, D.W.; Donnelly, M.K.

1997-02-01T23:59:59.000Z

258

Fuel loading and homogeneity analysis of HFIR design fuel plates loaded with uranium silicide fuel  

SciTech Connect

Twelve nuclear reactor fuel plates were analyzed for fuel loading and fuel loading homogeneity by measuring the attenuation of a collimated X-ray beam as it passed through the plates. The plates were identical to those used by the High Flux Isotope Reactor (HFIR) but were loaded with uranium silicide rather than with HFIR`s uranium oxide fuel. Systematic deviations from nominal fuel loading were observed as higher loading near the center of the plates and underloading near the radial edges. These deviations were within those allowed by HFIR specifications. The report begins with a brief background on the thermal-hydraulic uncertainty analysis for the Advanced Neutron Source (ANS) Reactor that motivated a statistical description of fuel loading and homogeneity. The body of the report addresses the homogeneity measurement techniques employed, the numerical correction required to account for a difference in fuel types, and the statistical analysis of the resulting data. This statistical analysis pertains to local variation in fuel loading, as well as to ``hot segment`` analysis of narrow axial regions along the plate and ``hot streak`` analysis, the cumulative effect of hot segment loading variation. The data for all twelve plates were compiled and divided into 20 regions for analysis, with each region represented by a mean and a standard deviation to report percent deviation from nominal fuel loading. The central regions of the plates showed mean values of about +3% deviation, while the edge regions showed mean values of about {minus}7% deviation. The data within these regions roughly approximated random samplings from normal distributions, although the chi-square ({chi}{sup 2}) test for goodness of fit to normal distributions was not satisfied.

Blumenfeld, P.E.

1995-08-01T23:59:59.000Z

259

Building Controls and Facilities Management in 21st Century  

SciTech Connect

Managing buildings requires a wide array of skills and tools for building operations, maintenance, engineering, forecasting, budgeting, health, safety, and security. Recent developments in open communication standards for building automation systems (BASs), as well as the pervasive use of Internet and intranet technologies, have created a flood of new options for owners and operators of facilities. The ability to manage facilities over the Internet enables remote monitoring, remote equipment diagnostics, and load aggregation -- all of which require significant data and image transfers in real time. In this paper we present a conceptual design to extend the traditional role of facilities management. The advantages of managing facilities that are distributed over the Internet are also described. Implementation and integration of various facilities management functions (remote monitoring, remote diagnostics, load aggregation, and whole facility optimization) are described as well.

Katipamula, Srinivas (BATTELLE (PACIFIC NW LAB)); Armstrong, Peter R. (BATTELLE (PACIFIC NW LAB)); Brambley, Michael R. (BATTELLE (PACIFIC NW LAB)); Pratt, Robert G. (BATTELLE (PACIFIC NW LAB)); Chassin, David P. (BATTELLE (PACIFIC NW LAB))

2000-01-01T23:59:59.000Z

260

A Note on Online Load Balancing for Related Machines  

E-Print Network (OSTI)

(j) that will execute it. We define the load of a machine i and the load of entire schedule s as follows: load(s; i) = 1A Note on On­line Load Balancing for Related Machines Piotr Berman \\Lambda Marek Karpinski y that differ in speed but are related in the following sence: a job of size p requires time p=v on a machine

Eckmiller, Rolf

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

The Temperature Sensitivity of the Residential Load and Commercial Building Load  

SciTech Connect

This paper presents a building modeling approach to quickly quantify climate change impacts on energy consumption, peak load, and load composition of residential and commercial buildings. This research focuses on addressing the impact of temperature changes on the building heating and cooling load in 10 major cities across the Western United States and Canada. A building simulation software are first used to quantify the hourly energy consumption of different building types by end-use and by vintage. Then, the temperature sensitivities are derived based on the climate data inputs.

Lu, Ning; Taylor, Zachary T.; Jiang, Wei; Correia, James; Leung, Lai R.; Wong, Pak C.

2009-07-26T23:59:59.000Z

262

LTS Project Management - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Transition LTS Execution Project Management Planning Resource Management Reporting Interface Management Communications (InternalExternal) Information Management Records...

263

Risk management  

SciTech Connect

In the autumn of 1993 an incident occurred with a diving support vessel, whereby a live pipeline from a NAM gas production platform, situated in the Dutch sector of the North Sea, was considerably displaced. Key element in the repair of the line was to identify potential hazards involved in various remedial scenarios and to manage the associated risks.

Visser, M. [Nederlandse Aardolie Maatschappij, Velsen (Netherlands)

1995-12-31T23:59:59.000Z

264

Data Management Policy | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

Data Management Policy Data Management Policy The data management resource information and data release policies below are provided to help researchers understand the data...

265

Object Management Systems  

E-Print Network (OSTI)

Object-Oriented Database Management Systems for EngineeringR. Cassel. Distribution Management Systems: Functions and8-PWR 1988. Network Management Systems 52 Subodh Bapat.

Gollu, Aleks Ohannes

1995-01-01T23:59:59.000Z

266

Environmental Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts...

267

Environmental Management System Plan  

E-Print Network (OSTI)

R-3 • Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

Fox, Robert

2009-01-01T23:59:59.000Z

268

Deemed Savings Estimates for Legacy Air Conditioning and WaterHeating Direct Load Control Programs in PJM Region  

SciTech Connect

During 2005 and 2006, the PJM Interconnection (PJM) Load Analysis Subcommittee (LAS) examined ways to reduce the costs and improve the effectiveness of its existing measurement and verification (M&V) protocols for Direct Load Control (DLC) programs. The current M&V protocol requires that a PURPA-compliant Load Research study be conducted every five years for each Load-Serving Entity (LSE). The current M&V protocol is expensive to implement and administer particularly for mature load control programs, some of which are marginally cost-effective. There was growing evidence that some LSEs were mothballing or dropping their DLC programs in lieu of incurring the expense associated with the M&V. This project had several objectives: (1) examine the potential for developing deemed savings estimates acceptable to PJM for legacy air conditioning and water heating DLC programs, and (2) explore the development of a collaborative, regional, consensus-based approach for conducting monitoring and verification of load reductions for emerging load management technologies for customers that do not have interval metering capability.

Goldman, Charles

2007-03-01T23:59:59.000Z

269

Interval analysis applied to the maximum loading point of electric power systems considering load data uncertainties  

Science Journals Connector (OSTI)

Abstract This paper proposes a simple and efficient power flow method to calculate, in an interval manner, the main variables corresponding to the maximum loading point, under load data uncertainties. The resulting interval nonlinear system of equations is solved using Krawczyk method. The proposed methodology is implemented in the Matlab environment using the Intlab toolbox. Results are compared with those obtainable by Monte Carlo simulations. IEEE 30 bus system and a South-southeastern Brazilian network are used to validate the proposed methodology.

L.E.S. Pereira; V.M. da Costa

2014-01-01T23:59:59.000Z

270

Architectural Surety Applications for Building Response to Dynamic Loads  

SciTech Connect

This paper provides a summary introduction to the emerging area of Architectural Surety{trademark} applications for buildings and infrastructures that are subjected to dynamic loads from blast and naturally occurring events. This technology area has been under investigation to assist with the definition of risks associated with dynamic loads and to provide guidance for determining the required upgrading and retrofitting techniques suggested for reducing building and infrastructure vulnerabilities to such dynamic forces. This unique approach involves the application of risk management techniques for solving problems of the as-built environment through the application of security, safety, and reliability principles developed in the nuclear weapons programs of the United States Department of Energy (DOE) and through the protective structures programs of the German Ministry of Defense (MOD). The changing responsibilities of engineering design professionals are addressed in light of the increased public awareness of structural and facility systems' vulnerabilities to malevolent, normal, and abnormal environment conditions. Brief discussions are also presented on (1) the need to understand how dynamic pressures are affected by the structural failures they cause, (2) the need to determine cladding effects on columns, walls, and slabs, and (3) the need to establish effective standoff distance for perimeter barriers. A summary description is presented of selected technologies to upgrade and retrofit buildings by using high-strength concrete and energy-absorbing materials and by specifying appropriately designed window glazing and special masonry wall configurations and composites. The technologies, material performance, and design evaluation procedures presented include super-computational modeling and structural simulations, window glass fragmentation modeling, risk assessment procedures, instrumentation and health monitoring systems, three-dimensional CAD virtual reality visualization techniques, and material testing data.

Matalucci, R.V.; Mayrhofer, C.

1999-02-10T23:59:59.000Z

271

Recycle of iodine-loaded silver mordenite by hydrogen reduction  

SciTech Connect

In 1977 and 1978, workers at Idaho National Engineering Laboratory (INEL) developed and tested a process for the regeneration and reuse of silver mordenite, AgZ, used to trap iodine from the dissolver off-gas stream of a nuclear fuel reprocessing plant. We were requested by the Airborne Waste Management Program Office of the Department of Energy to perform a confirmatory recycle study using repeated loadings at about 150/sup 0/C with elemental iodine, each followed by a drying step at 300/sup 0/C, then by iodine removal using elemental hydrogen at 500/sup 0/C. The results of our study show that AgZ can be recycled. There was considerable difficulty in stripping the iodine at 500/sup 0/C.; however, this step went reasonably well at 550/sup 0/C or slightly higher, with no apparent loss in the iodine-loading capacity of the AgZ. Large releases of elemental iodine occurred during the drying stage and the early part of the stripping stage. Lead zeolite, which was employed in the original design to trap the HI produced, is ineffective in removal of I/sub 2/. The process needs modification to handle the iodine. Severe corrosion of the stainless steel components of the system resulted from the HI-I/sub 2/-H/sub 2/O mixture. Monel or other halogen-resistant materials need to be examined for this application. Because of difficulty with the stripping stage and with corrosion, the experiments were terminated after 12 cycles. Thus, the maximum lifetime (cycles) of recycle AgZ has not been determined. Mechanistic studies of iodine retention by silver zeolites and of the behavior of silver atoms on the reduction stage would be of assistance in optimizing silver mordenite recycle.

Burger, L.L.; Scheele, R.D.

1982-11-01T23:59:59.000Z

272

Federal Energy Management Program: Best Management Practice: Cooling Tower  

NLE Websites -- All DOE Office Websites (Extended Search)

Cooling Tower Management to someone by E-mail Cooling Tower Management to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Cooling Tower Management on Facebook Tweet about Federal Energy Management Program: Best Management Practice: Cooling Tower Management on Twitter Bookmark Federal Energy Management Program: Best Management Practice: Cooling Tower Management on Google Bookmark Federal Energy Management Program: Best Management Practice: Cooling Tower Management on Delicious Rank Federal Energy Management Program: Best Management Practice: Cooling Tower Management on Digg Find More places to share Federal Energy Management Program: Best Management Practice: Cooling Tower Management on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

273

Federal Energy Management Program: Best Management Practice: Water  

NLE Websites -- All DOE Office Websites (Extended Search)

Water Management Planning to someone by E-mail Water Management Planning to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Water Management Planning on Facebook Tweet about Federal Energy Management Program: Best Management Practice: Water Management Planning on Twitter Bookmark Federal Energy Management Program: Best Management Practice: Water Management Planning on Google Bookmark Federal Energy Management Program: Best Management Practice: Water Management Planning on Delicious Rank Federal Energy Management Program: Best Management Practice: Water Management Planning on Digg Find More places to share Federal Energy Management Program: Best Management Practice: Water Management Planning on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

274

Managing Critical Management Improvement Initiatives  

Directives, Delegations, and Requirements

Provides requirements and responsibilities for planning, executing and assessing critical management improvement initiatives within DOE. DOE N 251.59, dated 9/27/2004, extends this Notice until 10/01/2005. Archived 11-8-10. Does not cancel other directives.

2003-10-01T23:59:59.000Z

275

1996 Pacific Northwest Loads and Resources Study.  

SciTech Connect

The Pacific Northwest Loads and Resources Study (White Book) is published annually by BPA and establishes the planning basis for supplying electricity to customers. It serves a dual purpose. First, the White Book presents projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. Second, the White Book serves as a benchmark for annual BPA determinations made pursuant to the 1981 regional power sales contracts. Specifically, BPA uses the information in the White Book for determining the notice required when customers request to increase or decrease the amount of power purchased from BPA. Aside from these purposes, the White Book is used for input to BPA`s resource planning process. The White Book compiles information obtained from several formalized resource planning reports and data submittals, including those from the Northwest Power Planning Council (Council) and the Pacific Northwest Utilities Conference Committee (PNUCC). 11 figs., 12 tabs.

United States. Bonneville Power Administration.

1996-12-01T23:59:59.000Z

276

NREL: Vehicle Ancillary Loads Reduction - Integrated Modeling  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Modeling Integrated Modeling NREL's Vehicle Ancillary Loads Reduction (VALR) team predicts the impact of advanced vehicle cooling technologies before testing by using an integrated modeling process. Evaluating the heat load on a vehicle under real world conditions is a difficult task. An accepted method to evaluate passenger compartment airflow and heat transfer is computational fluid dynamics. (CFD). Combining analytical models with CFD provides a powerful tool to assist industry both on current vehicles and on future design studies. Flow chart showing the vehicle integrated modeling process which considers solar radiation, air conditioning, and vehicles with CAD, glazing, cabin thermal/fluid, and thermal comfort modeling tools. Results are provided for fuel economy, tailpipe emissions and occupant thermal comfort.

277

Definition: Direct Load Control Device | Open Energy Information  

Open Energy Info (EERE)

Load Control Device Load Control Device Jump to: navigation, search Dictionary.png Direct Load Control Device A remotely controllable switch that can turn power to a load or appliance on or off. Such a device could also be used to regulate the amount of power that a load can consume. Direct load control devices can be operated by a utility or third party energy provider to reduce a customer's energy demand at certain times.[1] Related Terms power, load References ↑ https://www.smartgrid.gov/category/technology/direct_load_control_device [[Ca LikeLike UnlikeLike You like this.Sign Up to see what your friends like. tegory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Direct_Load_Control_Device&oldid=502631

278

Seismic considerations in the evaluation of temporary loads  

SciTech Connect

Temporary loads in nuclear power facilities can result from a number of activities including special one time operating conditions, repair and upgrade conditions, and ALARA requirements for operation, inspection and maintenance. Many times evaluation of these loadings includes their consideration in conjunction with other design basis loadings such as normal loads and extreme event loads including earthquake loadings. At times this combination with design basis extreme loads, such as earthquake, results in predicted structural demands which exceed the design basis capacity. Many times a major contributor to this demand prediction is the earthquake loadings. Discussed in this paper are analytical methods, probabilistic considerations, and earthquake experienced based evaluations which can be applied to reduce the earthquake demand for short term temporary loadings.

Adams, T.M. [Stevenson and Associates, Cleveland, OH (United States); Stevenson, J.D.

1996-12-01T23:59:59.000Z

279

The use of systematic reviews to analyse demand-side management policy  

Science Journals Connector (OSTI)

Demand-side management (DSM) seeks to reduce overall energy ... change when energy is used to reduce peak demands and smooth the load curve. DSM is ... and carbon emissions reduction. However, the policy side of ...

Peter Warren

2014-06-01T23:59:59.000Z

280

Impact of Workload and Renewable Prediction on the Value of Geographical Workload Management  

Science Journals Connector (OSTI)

There has been increasing demand for energy sustainable and low-cost operation in cloud computing. This paper proposes dynamic Geographical Load Balancing and energy buffering management (GLB) to achieve these .....

Zahra Abbasi; Madhurima Pore; Sandeep K. S. Gupta

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Environmental Management  

SciTech Connect

Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

None

2014-11-12T23:59:59.000Z

282

Environmental Management  

ScienceCinema (OSTI)

Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

None

2015-01-07T23:59:59.000Z

283

Best Management Practice #1: Water Management Planning  

Energy.gov (U.S. Department of Energy (DOE))

A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

284

Federal Emergency Management Agency | Open Energy Information  

Open Energy Info (EERE)

Emergency Management Agency Emergency Management Agency Jump to: navigation, search Logo: Federal Emergency Management Agency Name Federal Emergency Management Agency Address 500 C Street SW Place Washington, District of Columbia Zip 20472 Year founded 1979 Website http://www.fema.gov/ Coordinates 38.8858427°, -77.0182049° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.8858427,"lon":-77.0182049,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

285

Energy Management Services LLC | Open Energy Information  

Open Energy Info (EERE)

Energy Management Services LLC Energy Management Services LLC Jump to: navigation, search Name Energy Management Services LLC Place Encinitas, California Zip CA. 92024 Sector Services Product Energy Management Services, Inc coordinates consumers and natural gas supplyers. It also offers marketing and financing consultation. Coordinates 33.045436°, -117.292518° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.045436,"lon":-117.292518,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

286

Oregon Coastal Management Program | Open Energy Information  

Open Energy Info (EERE)

Coastal Management Program Coastal Management Program Jump to: navigation, search Logo: Oregon Coastal Management Program Name Oregon Coastal Management Program Address 635 Capitol St. NE Place Salem, Oregon Zip 97301-2540 Website http://www.oregon.gov/LCD/OCMP Coordinates 44.943778°, -123.026308° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.943778,"lon":-123.026308,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

287

Pacesetter Management Group | Open Energy Information  

Open Energy Info (EERE)

Pacesetter Management Group Pacesetter Management Group Jump to: navigation, search Name Pacesetter Management Group Place Stanley, Wisconsin Product Wisconsin based Pacesetter manages construction and operation of ethanol plants, as well as marketing the ethanol produced at the plant. Coordinates 44.958844°, -90.937009° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.958844,"lon":-90.937009,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

288

Methods for Analyzing Electric Load Shape and its Variability  

SciTech Connect

Current methods of summarizing and analyzing electric load shape are discussed briefly and compared. Simple rules of thumb for graphical display of load shapes are suggested. We propose a set of parameters that quantitatively describe the load shape in many buildings. Using the example of a linear regression model to predict load shape from time and temperature, we show how quantities such as the load?s sensitivity to outdoor temperature, and the effectiveness of demand response (DR), can be quantified. Examples are presented using real building data.

Price, Philip

2010-05-12T23:59:59.000Z

289

Use of energy management systems for performance monitoring of industrial  

NLE Websites -- All DOE Office Websites (Extended Search)

Use of energy management systems for performance monitoring of industrial Use of energy management systems for performance monitoring of industrial load-shaping measures Title Use of energy management systems for performance monitoring of industrial load-shaping measures Publication Type Journal Article Year of Publication 1988 Authors Akbari, Hashem, Mashuri Warren, Anibal De T. Almeida, Deborah J. Connell, and Jeffrey P. Harris Journal Energy Volume 13 Pagination 253-263 Abstract We have studied the use of industrial energy management and control systems (EMCSs) for monitoring the performance of electric load-shaping measures in three of California's most electricity-intensive and rapidly growing industrial sectors: food, plastics, and computing equipment and electronics. In this paper, we summarize current load-shaping strategies, report on the current use of EMCSs in selected industries, and recommend ways for electric utility companies to verify the potential of EMCSs for performance monitoring. We conclude that EMCSs can be used to collect and store data for evaluating industrial load shaping. Some sophisticated EMCSs are currently being used for this purpose, mostly in larger electronics firms. Most EMCSs now available need to be customized to monitor a particular facility. We also conclude that electric utility companies can encourage the use of EMCSs for performance monitoring by helping to educate their industrial customers about EMCSs, establishing protocols to standardize communication between EMCSs, and testing EMCSs with data-logging functions at demonstration sites.

290

Contract Management Certificate Program  

E-Print Network (OSTI)

Contract Management Certificate Program Accelerate Your Career BusinessandManagement extension bearing the UC seal signifies a well- known, uncompromising standard of academic excellence. #12;Contract Management Certificate Program UC Irvine Extension's Contract Management Certificate Program focuses on core

Rose, Michael R.

291

Your Records Management Responsibilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Your Records Management Your Records Management Responsibilities Table of Contents INTRODUCTION RECORDS MANAGEMENT IN THE FEDERAL GOVERNMENT RECORDS MANAGEMENT IN THE DEPARTMENT OF ENERGY IMPORTANCE OF RECORDS MANAGEMENT YOUR RECORDS MANAGEMENT RESPONSIBILITIES RECORDS MANAGEMENT LIFE CYCLE ELECTRONIC RECORDS & RECORDKEEPING LAW, REGULATION, AND POLICY ASSISTANCE RECORDS MANAGEMENT TERMS 2 INTRODUCTION If you are a government employee or contractor working for a federal agency, records management is part of your job. This pamphlet explains your responsibilities for federal records and provides the context for understanding records management in the federal government and in the Department of Energy. TOP RECORDS MANAGEMENT IN THE FEDERAL GOVERNMENT

292

SLUDGE TREATMENT PROJECT COST COMPARISON BETWEEN HYDRAULIC LOADING AND SMALL CANISTER LOADING CONCEPTS  

SciTech Connect

The Sludge Treatment Project (STP) is considering two different concepts for the retrieval, loading, transport and interim storage of the K Basin sludge. The two design concepts under consideration are: (1) Hydraulic Loading Concept - In the hydraulic loading concept, the sludge is retrieved from the Engineered Containers directly into the Sludge Transport and Storage Container (STSC) while located in the STS cask in the modified KW Basin Annex. The sludge is loaded via a series of transfer, settle, decant, and filtration return steps until the STSC sludge transportation limits are met. The STSC is then transported to T Plant and placed in storage arrays in the T Plant canyon cells for interim storage. (2) Small Canister Concept - In the small canister concept, the sludge is transferred from the Engineered Containers (ECs) into a settling vessel. After settling and decanting, the sludge is loaded underwater into small canisters. The small canisters are then transferred to the existing Fuel Transport System (FTS) where they are loaded underwater into the FTS Shielded Transfer Cask (STC). The STC is raised from the basin and placed into the Cask Transfer Overpack (CTO), loaded onto the trailer in the KW Basin Annex for transport to T Plant. At T Plant, the CTO is removed from the transport trailer and placed on the canyon deck. The CTO and STC are opened and the small canisters are removed using the canyon crane and placed into an STSC. The STSC is closed, and placed in storage arrays in the T Plant canyon cells for interim storage. The purpose of the cost estimate is to provide a comparison of the two concepts described.

GEUTHER J; CONRAD EA; RHOADARMER D

2009-08-24T23:59:59.000Z

293

Integrated Safety Management Policy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INTEGRATED SAFETY INTEGRATED SAFETY MANAGEMENT SYSTEM DESCRIPTION U.S. DEPARTMENT OF ENERGY Office of Environmental Management Headquarters May 2008 Preparation: Braj K. sin& Occupational Safety and Health Manager Office of Safety Management Concurrence: Chuan-Fu wu Director, Offlce of Safety Management Deputy Assistant Secretary for safe& Management andoperations Operations Officer for 1 Environmental Management Approval: Date p/-g Date Environmental Management TABLE OF CONTENTS ACRONYMS................................................................................................................................................................v EXECUTIVE SUMMARY .........................................................................................................................................1

294

Building Energy Software Tools Directory: HAP System Design Load  

NLE Websites -- All DOE Office Websites (Extended Search)

HAP System Design Load HAP System Design Load HAP System Design Load logo. Provides the load estimating and system design features found in its popular cousin � Carrier�s Hourly Analysis Program (HAP). By focusing on system design features, the HAP System Design Load program serves as a simpler, more efficient tool for those users only interested in system design; energy simulation features are omitted. Like the HAP program, HAP System Design Load provides the ease of use of a Windows-based graphical user interface and the computing power of modern 32-bit software. HAP System Design Load uses a system-based approach to HVAC load estimating. This approach tailors sizing procedures and results to the specific type of system being considered. A wide variety of equipment types

295

Data Mining in Load Forecasting of Power System  

Science Journals Connector (OSTI)

This project applies Data Mining technology to the prediction of electric power system load forecast. It proposes a mining program of electric power load forecasting data based on the similarity of time series .....

Guang Yu Zhao; Yan Yan; Chun Zhou Zhao…

2013-01-01T23:59:59.000Z

296

Data dependence path reduction with tunneling load instructions  

Science Journals Connector (OSTI)

The technique for reducing the length of the data dependence path is presented. This technique,...tunneling-load..., utilizes the register specifier buffer in order to hide the load latency, and thus reduces the ...

Toshinori Sato

1997-01-01T23:59:59.000Z

297

Bed load equation evaluation based on alluvial river data, India  

Science Journals Connector (OSTI)

The rate of bed load transport in weight per unit width for ... material has been computed by collecting the field data of Tapi River, in the monsoon season ... of this paper is to estimate the bed load carried b...

S. M. Yadav; B. K. Samtani

2008-11-01T23:59:59.000Z

298

Critical loads of acid deposition on Scottish soils  

Science Journals Connector (OSTI)

The impact of acid deposition, attributable to sulphur and nitrogen pollutants, on the soils of Scotland has been analysed using a critical loads approach. The critical load of a soil (as an indicator of ecolo...

Simon J. Langan; M. J. Wilson

1994-05-01T23:59:59.000Z

299

Laboratory testing of structures under dynamic loads: an introductory review  

Science Journals Connector (OSTI)

...research-article Theme Issue Dynamic testing of structures compiled by M. S. Williams Laboratory testing of structures under dynamic loads: an...introduces and reviews the theme of laboratory testing of structures under dynamic loads. The...

2001-01-01T23:59:59.000Z

300

Modeling and Estimating Current Harmonics of Variable Electronic Loads  

E-Print Network (OSTI)

This paper develops a model for relating input current harmonic content to real power consumption for variable electronic loads, specifically for loads' actively controlled inverters energized by an uncontrolled rectification ...

Wichakool, Warit

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Y-12 Finishes Initial HEUMF Loading Ahead of Schedule | National...  

National Nuclear Security Administration (NNSA)

Production Office NPO News Releases Y-12 Finishes Initial HEUMF Loading Ahead of Schedule Y-12 Finishes Initial HEUMF Loading Ahead of Schedule applicationmsword icon NR-01-10...

302

Energy management  

SciTech Connect

This paper is a review of the Department of Energy's (DOE) Contractor Purchasing System Review (CPSR) Program, which oversees the extensive subcontracting activities of the Department's management and operating (M and O) contractors. This review is part of a special GAO audit effort to help ensure that areas vulnerable to fraud, waste, abuse, and mismanagement are identified and that adequate corrective actions are taken. This effort focuses on 16 areas, one of which is DOE contractor oversight. This report describes the subcontracting deficiencies occurring at DOE, identifies shortcomings in DOE's CPSR Program, and discusses the corrective actions that DOE has committed to take in its CPSR Program in response to these findings.

Glenn, J.

1991-10-01T23:59:59.000Z

303

44-BWR WASTE PACKAGE LOADING CURVE EVALUATION  

SciTech Connect

The objective of this calculation is to evaluate the required minimum burnup as a function of initial boiling water reactor (BWR) assembly enrichment that would permit loading of spent nuclear fuel into the 44 BWR waste package configuration as provided in Attachment IV. This calculation is an application of the methodology presented in ''Disposal Criticality Analysis Methodology Topical Report'' (YMP 2003). The scope of this calculation covers a range of enrichments from 0 through 5.0 weight percent (wt%) U-235, and a burnup range of 0 through 40 GWd/MTU. This activity supports the validation of the use of burnup credit for commercial spent nuclear fuel applications. The intended use of these results will be in establishing BWR waste package configuration loading specifications. Limitations of this evaluation are as follows: (1) The results are based on burnup credit for actinides and selected fission products as proposed in YMP (2003, Table 3-1) and referred to as the ''Principal Isotopes''. Any change to the isotope listing will have a direct impact on the results of this report. (2) The results of 100 percent of the current BWR projected waste stream being able to be disposed of in the 44-BWR waste package with Ni-Gd Alloy absorber plates is contingent upon the referenced waste stream being sufficiently similar to the waste stream received for disposal. (3) The results are based on 1.5 wt% Gd in the Ni-Gd Alloy material and having no tuff inside the waste package. If the Gd loading is reduced or a process to introduce tuff inside the waste package is defined, then this report would need to be reevaluated based on the alternative materials.

J.M. Scaglione

2004-08-25T23:59:59.000Z

304

Application of release rate data to hazard load calculations  

Science Journals Connector (OSTI)

The author illustrates methods of applying heat, smoke and toxic gas release rate data to calculating fire hazard loading values.

Edwin E. Smith

1974-08-01T23:59:59.000Z

305

U-178: VMware vMA Library Loading Error Lets Local Users Gain Elevated  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: VMware vMA Library Loading Error Lets Local Users Gain 8: VMware vMA Library Loading Error Lets Local Users Gain Elevated Privileges U-178: VMware vMA Library Loading Error Lets Local Users Gain Elevated Privileges May 29, 2012 - 7:00am Addthis PROBLEM: A vulnerability was reported in VMware vMA PLATFORM: Version(s): vMA 4.0, 4.1, 5 patch 1 (5.0.0.1) ABSTRACT: A local user can obtain elevated privileges on the target system. Reference Links: SecurityTracker Alert ID: 1027099 CVE-2012-2752 Vendor Advisory IMPACT ASSESSMENT: High Discussion: A local user can exploit a library loading error to cause arbitrary code to be executed on the target system with elevated privileges. Impact: Privilege escalation Solution: The vendor has issued a fix (vSphere Management Assistant 5.0 Patch 2 (5.0.0.2)). Addthis Related Articles T-591: VMware vmrun Utility Lets Local Users Gain Elevated Privileges

306

Filter loading corrections for real-time aethalometer measurements of fresh  

NLE Websites -- All DOE Office Websites (Extended Search)

Filter loading corrections for real-time aethalometer measurements of fresh Filter loading corrections for real-time aethalometer measurements of fresh diesel soot. (2007) Title Filter loading corrections for real-time aethalometer measurements of fresh diesel soot. (2007) Publication Type Journal Article Year of Publication 2007 Authors Jimenez, Jorge, Candis S. Claiborn, Timothy Larson, Thomas W. Kirchstetter, and Lara A. Gundel Journal Journal of Air and Waste Management Association Volume 57 Issue 7 Pagination 868-873 Abstract In this study, a correction was developed for the aethalometer to measure real-time black carbon (BC) concentrations in an environment dominated by fresh diesel soot. The relationship between the actual mass-specific absorption coefficient for BC and the BC-dependent attenuation coefficients was determined from experiments conducted in a diesel exposure chamber that provided constant concentrations of fine particulate matter (PM; PM(2.5); PM < 2.5 microm in aerodynamic diameter) from diesel exhaust. The aethalometer reported BC concentrations decreasing with time from 48.1 to 31.5 microg m(-3) when exposed to constant PM(2.5) concentrations of 55 +/- 1 microg m(-3) and b(scat) = 95 +/- 3 Mm(-1) from diesel exhaust. This apparent decrease in reported light-absorbing PM concentration was used to derive a correction K(ATN) for loading of strong light-absorbing particles onto or into the aethalometer filter tape, which was a function of attenuation of light at 880 nm by the embedded particles

307

Liquefaction through expander for base load LNG  

SciTech Connect

New natural gas liquefaction process using turbo expander has been developed to improve process thermal efficiency. The new process consists of precooling section which uses refrigerant with shell and tube heat exchangers or brazed aluminum plate-fin exchangers or spool wound heat exchanger and liquefaction section by iso-entropic expander. As a result of design study, thermal efficiency of the new liquefaction process has been confirmed to be in the highest level compared with other liquefaction processes. Also, since the new liquefaction process is constructed with commonly available equipment in industry, it can be readily adapted to base load LNG plants of any capacity without requiring expensive and specially designed equipment.

Nakamura, Moritaka; Kikkawa, Yoshitsugi [Chiyoda Corp., Yokohama (Japan)

1998-12-31T23:59:59.000Z

308

Pollution prevention assessment for a manufacturer of electrical load centers  

SciTech Connect

The US Environmental Protection Agency (EPA) has funded a pilot project to assist small and medium-size manufacturers who want to minimize their generation of waste but who lack the expertise to do so. In an effort to assist these manufacturers Waste Minimization Assessment Centers (WMACs) were established at selected universities and procedures were adapted from the EPA Waste Minimization Opportunity Assessment Manual. The WMAC team at the University of Tennessee performed an assessment at a plant that manufacturers electrical load centers. Raw materials, including coiled sheet steel and coiled copper strips, polystyrene pellets, and miscellaneous fasteners, are used in metal-working, injection molding, painting, and assembly operations. The team`s report, detailed findings and recommendations, indicated that a large quantity of waste overflow rinse water is generated and that significant cost savings could be achieved by installing valves that will allow operators to turn off the flow during periods of nonuse. This Research Brief was developed by the principal investigators and EPA`s National Risk Management Research Laboratory, Cincinnati, OH, to announce key findings of an ongoing research project that is fully documented in a separate report of the same title available from University City Science Center.

Jendrucko, R.J.; Thomas, T.M. [Univ. of Tennessee, Knoxville, TN (United States). Dept. of Engineering Science and Mathematics; Looby, G.P. [University City Science Center, Philadelphia, PA (United States)

1995-09-01T23:59:59.000Z

309

M E Environmental Management Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

safety  performance  cleanup  closure safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management Office of Site Restoration, EM-10 Office of D&D and Facility Engineering, EM-13 Facility Deactivation & Decommissioning (D&D) D&D Program Map Addendum: Impact of American Recovery and Reinvestment Act (ARRA) on EM's D&D Program 2013 Edition U.S. Department Of Energy safety  performance  cleanup  closure M E Environmental Management Environmental Management safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management 3/13/2013 The American Recovery and Reinvestment Act of 2009

310

The Watershed Management Approach  

E-Print Network (OSTI)

phosphorus loading by 25 percent or to develop a computer model that ac- curately predicts nitrogen and phosphorus loadings for a particular lake. What are water quality models? Water quality models use personal computers and mathematics to represent natural...

Persyn, Russell A.; Griffin, Molly; Williams, Amy T.; Wolfe, Clint

2008-08-11T23:59:59.000Z

311

Sibling competition and hunger increase allostatic load in spotted hyaenas  

Science Journals Connector (OSTI)

...probably increasing allostatic load in dominants [3]. Within-brood...competition [11] on allostatic load in twins of a free-ranging...reasons, we expect allostatic load measured by faecal glucocorticoid...males and 19 females). These data (see electronic supplementary...

2013-01-01T23:59:59.000Z

312

Chimaeric load among sympatric social bacteria increases with genotype richness  

Science Journals Connector (OSTI)

...contribute more to chimaeric load during development than...across chimaera treatments (data not shown). In some treatments...and C suffer chimaeric load (data not shown). This result...C to increase chimaeric load in the three-way mix...

2014-01-01T23:59:59.000Z

313

Reduced Study Load Application Form International Students on Student Visa  

E-Print Network (OSTI)

in a standard load for the following reasons: Continued on next page #12;CRICOS Provider No. 00300K (NTReduced Study Load Application Form International Students on Student Visa CRICOS Provider No. 00300K (NT/VIC) | CRICOS Provider No. 03286A (NSW) Study Load Requirements International students

314

On the Minimum Load Coloring Problem --Extended Abtract--  

E-Print Network (OSTI)

# such that the maximum load, l # := max{r# , b #}, is minimized. In the following we shall skip the term ``maximumOn the Minimum Load Coloring Problem --Extended Abtract-- Nitin Ahuja 1 , Andreas Baltz 2 Abstract. Given a graph G = (V, E) with n vertices, m edges and maximum vertex degree #, the load

Doerr, Benjamin

315

Numerical Simulation of Wave Loads on Static Offshore Structures  

E-Print Network (OSTI)

Numerical Simulation of Wave Loads on Static Offshore Structures Hrvoje Jasak, Inno Gatin, Vuko Workshop, Cambridge, 30 July 2014 Numerical Simulation of Wave Loads on Static Offshore Structures ­ p. #12 of Wave Loads on Static Offshore Structures ­ p. #12;VOF Free Surface Flow Model Modelling of Free Surface

316

Asymptotics of cellular buckling close to the Maxwell load  

Science Journals Connector (OSTI)

...bifurcation parameter (load) and frequency are scaled in powers of , which then...solution at the Maxwell load. From the derivatives...coefficients of like powers of : O() : Lu1...and the Maxwell load PM is excellent...above numerical data leads us to make...

2001-01-01T23:59:59.000Z

317

Scaling of load in communications networks Onuttom Narayan1  

E-Print Network (OSTI)

that the load at each node in a preferential attachment network scales as a power of the degree of the node power-law degree distributions as compared to the scaling of the load versus degree. This emphasizes that the probability distribution for the load scales as p(l) 1/l with = 2.2. Subsequently, data for net- works

California at Santa Cruz, University of

318

Dynamic versus Static Load Balancing in a Pipeline Computation \\Lambda  

E-Print Network (OSTI)

­ ber of data sets is pipelined through a series of tasks and load balancing is performed­ mance and fully utilize the power of parallel machines the load of the computations must be distributedDynamic versus Static Load Balancing in a Pipeline Computation \\Lambda Anna Brunstrom brunstro

Simha, Rahul

319

PARAMETRIC MODELS FOR ESTIMATING WIND TURBINE FATIGUE LOADS FOR DESIGN  

E-Print Network (OSTI)

loads. #12;2 INTRODUCTION Design constraints for wind turbine structures fall into either extreme load1 PARAMETRIC MODELS FOR ESTIMATING WIND TURBINE FATIGUE LOADS FOR DESIGN Lance Manuel1 Paul S, TX 78712 2 Sandia National Laboratories, Wind Energy Technology Department, Albuquerque, NM 87185

Sweetman, Bert

320

SAPHIRE 8 Volume 7 - Data Loading  

SciTech Connect

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer. SAPHIRE Version 8 is funded by the U.S. Nuclear Regulatory Commission and developed by the Idaho National Laboratory. This report is intended to assist the user to enter PRA data into the SAPHIRE program using the built-in MAR-D ASCII-text file data transfer process. Towards this end, a small sample database is constructed and utilized for demonstration. Where applicable, the discussion includes how the data processes for loading the sample database relate to the actual processes used to load a larger PRA models. The procedures described herein were developed for use with SAPHIRE Version 8. The guidance specified in this document will allow a user to have sufficient knowledge to both understand the data format used by SAPHIRE and to carry out the transfer of data between different PRA projects.

K. J. Kvarfordt; S. T. Wood; C. L. Smith; S. R. Prescott

2011-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

End-Use Load and Consumer Assessment Program: motivation and overview  

Science Journals Connector (OSTI)

The End-Use Load and Consumer Assessment Program (ELCAP) was a major end-use data collection program undertaken by the Bonneville Power Administration from 1983 through 1990 to obtain specific information to support a variety of conservation and forecasting activities. The objectives of the program were to test key assumptions used in current engineering and forecasting models, provide insights regarding how various factors affect energy consumption, provide information to support load management conservation and marketing programs, and identify conservation resource potential from new demand-side technologies or programs. To accomplish this, a well-designed experiment was required that accounted for adequate representation of both existing and new buildings in the residential and commercial sector of the Pacific Northwest. This paper summarizes the motivations for obtaining the data, information regarding the sample, an overview of the analysis agenda, and specifics regarding the data set, both engineering and characteristics.

F.J. Peterson; J.E. Patton; M.E. Miller; R.A. Gillman; W.M. Warwick; W.F. Sandusky

1993-01-01T23:59:59.000Z

322

Evaluating the DSM Potential for Industrial Electrotechnologies and Management Practices  

E-Print Network (OSTI)

EVALUATING THE DSM POTENTIAL FOR INDUSTRIAL ELECTROTECHNOLOGIES AND MANAGEMENT PRACTICES PATRICIA J. HARRELL Staff Consultant Houston Lighting & Power Co. Houston, Texas ABSTRACT In an effort to help balance load requirements...-side management (DSM) program. This paper outlines the procedures used to evaluate technologies that may impact oil refining, pulp & paper production, and 26 major chemical processes of industrial customers within HL&P's service area. Each technology...

Harrell, P. J.; Pavone, A.

323

Linkages between demand-side management and congestion in the European electricity transmission system  

Science Journals Connector (OSTI)

Abstract We evaluate the possibility to reduce congestion in the transmission grid through large-scale implementation of demand-side management (DSM) in the form of load shifting for the EU-27 countries, Norway, and Switzerland for Year 2020. A linear, cost-minimising, dispatch model that includes a DC load-flow description of the transmission system and a general representation of load shifting is used. It is assumed that the EU Member States fulfil the targets for Year 2020 in their national renewable energy action plans. In the model calculations, a reference case without load shifting is compared with cases in which the load shifting is 5%, 10%, 15% or 20% of the load. The possibility to shift load in time is added exogenously and economic incentives for DSM are not evaluated. Three types of congestion are identified: peak-load-hour congestion, low-load-hour congestion and all-hour congestion. Peak-load-hour congestion is reduced as the DSM share of the load increases, whereas low-load-hour congestion, which is typically associated with a high level of wind generation, persists at all the DSM penetration levels investigated. We show that all-hour congestion occurs between systems that have large differences in supply structure, and that the impact of DSM on all-hour congestion is low.

Lisa Göransson; Joel Goop; Thomas Unger; Mikael Odenberger; Filip Johnsson

2014-01-01T23:59:59.000Z

324

Rotordynamic coefficients for a load-between-pad, flexible-pivot tilting pad bearing at high loads  

E-Print Network (OSTI)

The dynamic and static performance of a flexure-pivot tilting pad bearing is presented at a load between pad configuration for various load and speed combinations. A similar work performed on the same bearing at lower loads ranging from 0-1 MPa (0...

Hensley, John Eric

2006-10-30T23:59:59.000Z

325

Energy management  

SciTech Connect

In January 1990 GAO began implementing a special audit effort to help ensure that areas vulnerable to fraud, waste, abuse, and mismanagement are identified and that appropriate corrective actions are taken. This effort focuses on 16 areas, one of which is the Department of Energy's (DOE) contracting practices. As part of this effort, the authors determined if contract audits for monitoring and overseeing DOE's contracting process were being performed and that we identify the impact or potential impact to the government when contract audits were not performed. Specifically, this paper discusses audit coverage of DOE's management and operating (M and O) contractors and DOE contracts, the problems that may occur when contract audit activity is not performed, and factors that have impeded contract audit coverage.

Dingell, J.D.

1991-10-01T23:59:59.000Z

326

A new generation of load sharing algorithms: the semi-adaptive load sharing algorithm  

E-Print Network (OSTI)

: Wael, Omar, Tamer, Ashraf and Hazem, who were always there for me. Your support and comfort have given me the strength to go through all the bad times. TABLE OF CONTENTS CHAPTER Page INTRODUCTION A. What is Load Sharing? B. Thesis Outline 2 4...

Morsy, Hazem Kamal

1997-01-01T23:59:59.000Z

327

Long-term Analysis of Gear Loads in Fixed Offshore Wind Turbines Considering Ultimate Operational Loadings  

Science Journals Connector (OSTI)

Abstract The long-term extreme value analysis of gear transmitted load due to the main shaft torque is presented. Two methods, the multibody simulations (MBS) and a simplified method, are demonstrated for the gear transmitted load calculation. The simplified method is verified by the MBS results. The long-term extreme value of the gear transmitted load for wind speeds from the cut-in to the cut-out values is calculated by the simplified method from the long-term distribution of the main shaft torque. Three statistical methods for long-term extreme value analysis of the main shaft torque in the offshore wind turbines are presented. They are then used to predict the extreme value of the gear transmitted load. An alternative approach, the design state or the environmental contour method is proposed and verified by the full long-term results. The methods are exemplified by a 5 MW gearbox case study. The results of this paper are the basis for further work in Ultimate Limit State (ULS) gear design.

Amir R. Nejad; Zhen Gao; Torgeir Moan

2013-01-01T23:59:59.000Z

328

Building Energy Software Tools Directory: QwickLoad  

NLE Websites -- All DOE Office Websites (Extended Search)

QwickLoad QwickLoad QwickLoad logo QwickLoad uses the ASHRAE TFM (Transfer Function Method) algorithms combined with a screen interface that provides building load calculations. It includes a Duct Sizing Program and supports IP and SI units. QwickLoad Residential 7.0 provides heat gain and heat loss calculations for up to 10 zones. QwickLoad Commercial 7.0 provides heat gain and heat loss calculations for up to 500 zones. Zones and plenums can be added or deleted with one button click. Intuitive screens for entering building information. Default is automatically displayed. Construction types for roofs, walls, partitions, windows, shade types, and scheduling control. Complete air-conditioning and heating system control and supply, return, heating and cooling duct static pressure specification. Energy recovery ventilator can

329

Technical Assistance to ISO's and Grid Operators For Loads Providing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Assistance to ISO's and Grid Operators For Loads Technical Assistance to ISO's and Grid Operators For Loads Providing Ancillary Services To Enhance Grid Reliability Technical Assistance to ISO's and Grid Operators For Loads Providing Ancillary Services To Enhance Grid Reliability Project demonstrates and promotes the use of responsive load to provide ancillary services; helps ISOsand grid operators understand the resource and how best to apply it. Technical Assistance to ISO's and Grid Operators For Loads Providing Ancillary Services To Enhance Grid Reliability More Documents & Publications Loads Providing Ancillary Services: Review of International Experience 2012 Load as a Resource Program Peer Review New York Independent System Operator, Smart Grid RFI: Addressing Policy and Logistical Challenges.

330

The Load Distribution Problem in a Processor Ring Francis C.M. Lau  

E-Print Network (OSTI)

the load balancing procedure into the following phases: load measurement, calculation of load averageThe Load Distribution Problem in a Processor Ring Francis C.M. Lau Department of Computer Science picture of the system load and the average load, the load distribution problem is to find a suitable

Lau, Francis C.M.

331

Overview - Data Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Help > Data Management Help > Data Management Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Overview Welcome to the data management pages for data providers to the ORNL Distributed Active Archive (DAAC). These pages provide an overview of data management planning and preparation and offer practical methods to successfully share and archive your data. Plan - write a short data management plan while preparing your research proposal, Manage - assign logical, descriptive file names, define the contents of your data files, and use consistent data values when preparing

332

Building Energy Software Tools Directory: InterLane Power Manager  

NLE Websites -- All DOE Office Websites (Extended Search)

InterLane Power Manager InterLane Power Manager InterLane Power Manager logo. Designed to meet the energy management needs of commercial and small industrial businesses. When added to an existing meter, InterLane Power Manager provides users with monitoring and control of their energy. A standalone software product, Energy View Lite, is also available. Keywords energy metering, monitoring, power management Validation/Testing N/A Expertise Required An InterLane Interactive Systems distributor will provide customer support and training. Users 8 utilities are installing the product in their service territories; numerous national commercial users have the system. Audience Utilities, energy service companies, and national accounts. Input Load star file or direct from the Interactive Control Unit (ICU)

333

Real Time Grid Reliability Management 2005  

SciTech Connect

The increased need to manage California?s electricity grid in real time is a result of the ongoing transition from a system operated by vertically-integrated utilities serving native loads to one operated by an independent system operator supporting competitive energy markets. During this transition period, the traditional approach to reliability management -- construction of new transmission lines -- has not been pursued due to unresolved issues related to the financing and recovery of transmission project costs. In the absence of investments in new transmission infrastructure, the best strategy for managing reliability is to equip system operators with better real-time information about actual operating margins so that they can better understand and manage the risk of operating closer to the edge. A companion strategy is to address known deficiencies in offline modeling tools that are needed to ground the use of improved real-time tools. This project: (1) developed and conducted first-ever demonstrations of two prototype real-time software tools for voltage security assessment and phasor monitoring; and (2) prepared a scoping study on improving load and generator response models. Additional funding through two separate subsequent work authorizations has already been provided to build upon the work initiated in this project.

Eto, Joe; Eto, Joe; Lesieutre, Bernard; Lewis, Nancy Jo; Parashar, Manu

2008-07-07T23:59:59.000Z

334

Federal Emergency Management Information System (FEMIS) Data Management Guide Version 1.3  

SciTech Connect

FEMIS is an emergency management planning and analysis tool that is being developed under the direction of the US Army Chemical and Biological Defense Command. FEMIS is designed to help civilian emergency management personnel to plan for and support their responses to a chemical-releasing event at a military chemical stockpile. This guide provides the background as well as the operations and procedures needed to generate and maintain the data resources in the system. Database administrators, system administrators, and general users can use this guide to manage the datafiles and database. This document provides a description of the relational and spatial information present in FEMIS. It describes how the data was assembled, loaded, and managed while the system is in operation.

Burnett, R.A.; Downing, T.R.; Gaustad, K.L.; Hoza, M.; Johnson, S.M.; Loveall, R.M.; Millard, W.D.; Winters, C.; Wood, B.M.

1996-12-01T23:59:59.000Z

335

FIRE MANAGEMENT PLAN MONTAGUE PLAIN  

E-Print Network (OSTI)

FIRE MANAGEMENT PLAN FOR MONTAGUE PLAIN WILDLIFE MANAGEMENT AREA #12;Fire Management Plan for Montague Plain Wildlife Management Area prepared for Massachusetts Dept. of Fisheries, Wildlife. 2003. Fire Management Plan for Montague Plain Wildlife Management Area. Department of Natural Resources

Schweik, Charles M.

336

NREL: Vehicle Ancillary Loads Reduction - Physiological Model  

NLE Websites -- All DOE Office Websites (Extended Search)

Physiological Model Physiological Model The Vehicle Ancillary Loads Reduction team developed a three-dimensional model to simulate human internal thermal physiological systems (muscle, blood, etc.) and thermoregulatory responses such as metabolic heat generation. The model was developed with ANSYS, a finite element software which computes heat flow by conduction, convection, and mass transport of the blood. A human tissue system model represents the human body, including the physiological and thermal properties of the tissues. The arms and legs consist of bone, muscle, fat, and skin. There are additional lung, abdominal, and brain tissues in the torso and head zones. The model calculates the conduction heat transfer based on the temperature gradients between the tissue nodes. Blood flow is modeled with a network of supply

337

Piezoelectric film load cell robot collision detector  

DOE Patents (OSTI)

A piezoelectric load cell which can be utilized for detecting collisions and obstruction of a robot arm end effector includes a force sensing element of metallized polyvinylidene fluoride (PVDF) film. The piezoelectric film sensing element and a resilient support pad are clamped in compression between upper and lower plates. The lower plate has a central recess in its upper face for supporting the support pad and sensing element, while the upper plate has a corresponding central projection formed on its lower face for bearing on the sensing element and support pad. The upper and lower plates are doweled together for concentric alignment and screwed together. The upper and lower plates are also adapted for mounting between the robot arm wrist and end effector. 3 figs.

Lembke, J.R.

1989-04-18T23:59:59.000Z

338

Piezoelectric film load cell robot collision detector  

DOE Patents (OSTI)

A piezoelectric load cell which can be utilized for detecting collisions and obstruction of a robot arm end effector includes a force sensing element of metallized polyvinylidene fluoride (PVDF) film. The piezoelectric film sensing element and a resilient support pad are clamped in compression between upper and lower plates. The lower plate has a central recess in its upper face for supporting the support pad and sensing element, while the upper plate has a corresponding central projection formed on its lower face for bearing on the sensing element and support pad. The upper and lower plates are dowelled together for concentric alignment and screwed together. The upper and lower plates are also adapted for mounting between the robot arm wrist and end effector.

Lembke, John R. (Overland Park, KS)

1989-04-18T23:59:59.000Z

339

Piezoelectric film load cell robot collision detector  

DOE Patents (OSTI)

A piezoelectric load cell which can be utilized for detecting collisions and obstruction of a robot arm end effector includes a force sensing element of metallized polyvinylidene fluoride (PVDF) film. The piezoelectric film sensing element and a resilient support pad are clamped in compression between upper and lower plates. The lower plate has a central recess in its upper face for supporting the support pad and sensing element, while the upper plate has a corresponding central projection formed on its lower face for bearing on the sensing element and support pad. The upper and lower plates are dowelled together for concentric alignment and screwed together. The upper and lower plates are also adapted for mounting between the robot arm wrist and end effector. 3 figs.

Lembke, J.R.

1988-03-15T23:59:59.000Z

340

Examination of shaped charge liner shock loading  

SciTech Connect

A series of experiments was conducted for the purpose of achieving a more fundamental understanding of the shaped charge liner shock loading environment. The test configuration, representing the middle portion of a shaped charge, consists of a 50 mm deep, 100 mm tall, and 2 mm thick copper plate driven by 50 mm deep, 100 mm tall, tapered thickness wedge of LX-14. An electrically driven 50 mm square flyer is used to surface initiate the base of the LX-14 causing a plane detonation wave to propagate into the explosive wedge along the liner surface. Fabry-Perot laser velocimetry measures the particle velocity time history of the plate. The CTH and DYNA2D hydrocodes are used to simulate the experiments. Calculations of the velocity profiles are compared to the experimental results. The effects of mesh density, copper material failure and strength models, and explosive detonation models are discussed.

Murphy, M.J.; Moore, T.W.; Lee, C.G.; Breithaupt, R.; Avara, G.R.

1996-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Improved catalyst loading reduces guard reactor fouling  

SciTech Connect

A new catalyst-loading strategy reduced the fouling tendency of the gas oil hydrotreater guard reactors at Syncrude Canada Ltd.'s heavy-crude upgrading facilities. Studies conducted on the guard reactors were designed to determine the thermal stability of the coker gas oil and to understand the properties of the fouling material. Small particles (described as fines) were present in the upper section of the removed catalyst bed. This part of the bed was then replaced in one of three ways. One way was to replace the catalyst with used, nonregenerated catalyst, and cover the catalyst with nonactive support balls, 10 and 13 mm in diameter. The second way was to fill the entire space with nonactive support balls, and the third way was to fill with regenerated oxidic catalyst combined with semiactive support balls (unsulfided).

Sanford, E.C.; Kirchen, R.P. (Syncrude Canada Ltd., Edmonton (CA))

1988-12-19T23:59:59.000Z

342

Impact of Paint Color on Rest Period Climate Control Loads in Long-Haul Trucks: Preprint  

SciTech Connect

Cab climate conditioning is one of the primary reasons for operating the main engine in a long-haul truck during driver rest periods. In the United States, sleeper cab trucks use approximately 667 million gallons of fuel annually for rest period idling. The U.S. Department of Energy's National Renewable Energy Laboratory's (NREL) CoolCab Project works closely with industry to design efficient thermal management systems for long-haul trucks that minimize engine idling and fuel use while maintaining occupant comfort. Heat transfer to the vehicle interior from opaque exterior surfaces is one of the major heat pathways that contribute to air conditioning loads during long-haul truck daytime rest period idling. To quantify the impact of paint color and the opportunity for advanced paints, NREL collaborated with Volvo Group North America, PPG Industries, and Dometic Environmental Corporation. Initial screening simulations using CoolCalc, NREL's rapid HVAC load estimation tool, showed promising air-conditioning load reductions due to paint color selection. Tests conducted at NREL's Vehicle Testing and Integration Facility using long-haul truck cab sections, 'test bucks,' showed a 31.1% of maximum possible reduction in rise over ambient temperature and a 20.8% reduction in daily electric air conditioning energy use by switching from black to white paint. Additionally, changing from blue to an advanced color-matched solar reflective blue paint resulted in a 7.3% reduction in daily electric air conditioning energy use for weather conditions tested in Colorado. National-level modeling results using weather data from major U.S. cities indicated that the increase in heating loads due to lighter paint colors is much smaller than the reduction in cooling loads.

Lustbader, J.; Kreutzer, C.; Jeffers, M.; Adelman, S.; Yeakel, S.; Brontz, P.; Olson, K.; Ohlinger, J.

2014-02-01T23:59:59.000Z

343

An Investigation to Resolve the Interaction Between Fuel Cell, Power Conditioning System and Application Loads  

SciTech Connect

Development of high-performance and durable solidoxide fuel cells (SOFCs) and a SOFC power-generating system requires knowledge of the feedback effects from the power-conditioning electronics and from application-electrical-power circuits that may pass through or excite the power-electronics subsystem (PES). Therefore, it is important to develop analytical models and methodologies, which can be used to investigate and mitigate the effects of the electrical feedbacks from the PES and the application loads (ALs) on the reliability and performance of SOFC systems for stationary and non-stationary applications. However, any such attempt to resolve the electrical impacts of the PES on the SOFC would be incomplete unless one utilizes a comprehensive analysis, which takes into account the interactions of SOFC, PES, balance-of-plant system (BOPS), and ALs as a whole. SOFCs respond quickly to changes in load and exhibit high part- and full-load efficiencies due to its rapid electrochemistry, which is not true for the thermal and mechanical time constants of the BOPS, where load-following time constants are, typically, several orders of magnitude higher. This dichotomy can affect the lifetime and durability of the SOFCSs and limit the applicability of SOFC systems for load-varying stationary and transportation applications. Furthermore, without validated analytical models and investigative design and optimization methodologies, realizations of cost-effective, reliable, and optimal PESs (and power-management controls), in particular, and SOFC systems, in general, are difficult. On the whole, the research effort can lead to (a) cost-constrained optimal PES design for high-performance SOFCS and high energy efficiency and power density, (b) effective SOFC power-system design, analyses, and optimization, and (c) controllers and modulation schemes for mitigation of electrical impacts and wider-stability margin and enhanced system efficiency.

Sudip K. Mazumder

2005-12-31T23:59:59.000Z

344

Impact of self-attraction and loading on the annual cycle in sea level  

E-Print Network (OSTI)

load and inferred ocean load following the SAL adjustment.following analysis, we assume that the Earth’s response to the changing continental loads

Tamisiea, M. E; Hill, E. M; Ponte, R. M; Davis, J. L; Velicogna, I.; Vinogradova, N. T

2010-01-01T23:59:59.000Z

345

Hierarchical Control and Management of Virtual Microgrids for Vehicle Electrification  

E-Print Network (OSTI)

of electrical power generation and delivery. A Smart Grid is an intelligent and automated energy grid and new types of loads such as plug-in (hybrid) electric vehicles (PEVs); (2) optimizing systemHierarchical Control and Management of Virtual Microgrids for Vehicle Electrification Feng Lina

Zhang, Hongwei

346

Hydrocarbons Heterogeneous Pyrolysis: Experiments and Modeling for Scramjet Thermal Management  

E-Print Network (OSTI)

1 Hydrocarbons Heterogeneous Pyrolysis: Experiments and Modeling for Scramjet Thermal Management : United States (2008)" #12;2 I. Introduction One of the main issues of the development of scramjet, an air to the endothermicity of its thermal decomposition. Because of the large heat load found in a scramjet, engine

Paris-Sud XI, Université de

347

Designing and Managing Datacenters Powered by Renewable Energy  

E-Print Network (OSTI)

energy supply [1, 4, 6, 9, 11]. For high- est benefits, green datacenter operators must intelligently an expected load peak when the renewable energy is not avail- able). As far as we know, current greenDesigning and Managing Datacenters Powered by Renewable Energy ´I~nigo Goiri, William Katsak, Kien

348

Dynamic Power Management with Power Network-on-Chip Inna Vaisband and Eby G. Friedman  

E-Print Network (OSTI)

Dynamic Power Management with Power Network-on-Chip Inna Vaisband and Eby G. Friedman Department dynamically controlled power to support power efficient and portable systems. Effi- ciently providing multiple point-of-load on-chip voltages requires fundamental changes to the power delivery and management process

Friedman, Eby G.

349

ELECTRICAL ENGINEERING 4PL4 ENERGY SYSTEM AND MANAGEMENT FALL 2010  

E-Print Network (OSTI)

ELECTRICAL ENGINEERING 4PL4 ENERGY SYSTEM AND MANAGEMENT FALL 2010 Course Outline (dated Aug 23 OR ORAL). COURSE LOADING: · Lectures: 3 hours/week · Study time: 6 hours/week · Laboratory (4; systemwide energy flow and control; modeling and simulation; economics and management; fault prediction

Haykin, Simon

350

UPC Solar Managment LLC | Open Energy Information  

Open Energy Info (EERE)

UPC Solar Managment LLC UPC Solar Managment LLC Jump to: navigation, search Name UPC Solar Managment LLC Place Chicago, Illinois Zip 60606 Sector Renewable Energy, Solar Product UPC Solar is a renewable energy development company that finances, owns and operates commercial scale PV energy projects throughout North America. Coordinates 41.88415°, -87.632409° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.88415,"lon":-87.632409,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

351

Applied Energy Management | Open Energy Information  

Open Energy Info (EERE)

Management Management Jump to: navigation, search Name Applied Energy Management Place Huntersville, North Carolina Zip 28078 Sector Efficiency, Renewable Energy Product North Carolina-based, energy efficiency and renewable energy service and construction company. Coordinates 35.409853°, -80.842716° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.409853,"lon":-80.842716,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

352

Planetary Emissions Management | Open Energy Information  

Open Energy Info (EERE)

Planetary Emissions Management Planetary Emissions Management Jump to: navigation, search Name Planetary Emissions Management Place Cambridge, Massachusetts Sector Carbon Product US-based, company offering measurements of carbon budgets using laser technology. Coordinates 43.003745°, -89.017499° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.003745,"lon":-89.017499,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

353

Vencon Management, Inc | Open Energy Information  

Open Energy Info (EERE)

Management, Inc Management, Inc Jump to: navigation, search Name Vencon Management, Inc Address 301 West 53rd Street Place New York, New York Zip 10019 Region New York Area - NY NJ CT PA Coordinates 40.7642006°, -73.9847564° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.7642006,"lon":-73.9847564,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

354

Community Management Company | Open Energy Information  

Open Energy Info (EERE)

Management Company Management Company Jump to: navigation, search Name Community Management Company Address 1 St. Nicholas Terrace Place New York, New York Zip 10029 Region Northeast - NY NJ CT PA Area Coordinates 40.812561°, -73.952389° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.812561,"lon":-73.952389,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

355

Affiliated International Management (AIM) | Open Energy Information  

Open Energy Info (EERE)

Affiliated International Management (AIM) Affiliated International Management (AIM) Jump to: navigation, search Name Affiliated International Management (AIM) Place Newport Beach, CA Zip 92658 Coordinates 33.6392245°, -117.8647782° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.6392245,"lon":-117.8647782,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

356

Categorical Exclusion 4565, Waste Management Construction Support  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FornI FornI Project Title: Waste Management Construction Support (4565) Program or Program Office: Y -12 Site Office Location: Oak Ridge Tennessee Project Description: This work scope is an attempt to cover the general activities that construction would perform in support of Waste Management activities. Work includes construction work performed in support of Waste Management Sustainability and Stewardship projects and programs to include: load waste into containers; open, manipulate containers; empty containers; decommission out-of-service equipment (includes removal of liquids, hazardous, and universal wastes); apply fabric and gravel to ground; transport equipment; transport materials; transport waste; remove vegetation; place barriers; place erosion controls; operate wheeled and tracked equipment; general carpentry. Work will be performed on dirt, vegetated, graveled, or paved surfaces in

357

Winslow Management Company LLC | Open Energy Information  

Open Energy Info (EERE)

Winslow Management Company LLC Winslow Management Company LLC Place Boston, Massachusetts Zip 2110 Product Boston-based, environmentally focused investment advisory firm that manages assets for institutions, corporations and non-profit institutions. Coordinates 42.358635°, -71.056699° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.358635,"lon":-71.056699,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

358

Demand Management Institute (DMI) | Open Energy Information  

Open Energy Info (EERE)

Demand Management Institute (DMI) Demand Management Institute (DMI) Jump to: navigation, search Name Demand Management Institute (DMI) Address 35 Walnut Street Place Wellesley, Massachusetts Zip 02481 Sector Buildings Product Provides analysis for buildings on reducing energy use Website http://www.dmiinc.com/ Coordinates 42.3256508°, -71.2530294° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.3256508,"lon":-71.2530294,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

359

Appendix 9 - iManage Interfaces  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 - iManage Interfaces 8 - iManage Interfaces STARS, STRIPES, IDW/iPortal utilize a number of internal and external interfaces to interconnect and share information within iManage, and other systems, both DOE and non-DOE. The PWS is not limited to the interfaces listed below as other interfaces may be required to be developed and/or supported during the performance of this contract. The current interfaces are described below. STARS The STARS interface programs utilize standard API's and Interface tables built into the Oracle Applications E-Business software suite. Standard Concurrent Requests within the financial system are configured to process the interface records once they are loaded into the interface tables. Successful interface records that process through the interface API's are inserted and

360

Waste Management | Department of Energy  

Energy Savers (EERE)

Management Waste Management Oak Ridge has an onsite CERCLA disposal facility, the Environmental Management Waste Management Facility, that reduces cleanup and transportation costs....

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Demonstration and Performance Monitoring of Foundation Heat Exchangers in Low Load, High Performance Research Homes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Demonstration and Performance Monitoring of Foundation Heat Exchangers (FHX) in Low Load, High Performance Research Homes Piljae Im, Ph.D. Oak Ridge National Laboratory Building America Technical Update Meeting April 29 - 30, Denver, Colorado ACKNOWLEDGEMENT * This project was sponsored by the Building Technologies Office of the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy and the Tennessee Valley Authority (TVA). Managed by UT-Battelle for the U.S. Department of Energy 2 PRESENTATION OVERVIEW * INTRODUCTION * FIELD TEST OF THE FOUNDATION HEAT EXCHANGER (FHX) CONCEPT * FOUNDATION HEAT EXCHANGER PERFORMANCE MEASUREMENTS * ADDITIONAL FINDINGS AND COST COMPARISON * SUMMARY Managed by UT-Battelle for the U.S. Department of Energy

362

A Study on Energy Efficiency Improvement Opportunities for Plug Loads in Buildings in the Equatorial Region  

Science Journals Connector (OSTI)

Abstract The small plug loads in the tropical buildings are among the fastest growing sources of energy use. Yet, there are comparatively fewer studies that were focused on the energy efficiency improvement potentials of the office equipment due to its elusive, more diversified and sophisticated nature. This objective of this study is to identify the opportunity for energy efficiency improvement of the frequently used office equipment in a commercial building in Malaysia, by focusing on the occupant behaviour and software power management features. The outcomes show that about 19% of the total energy demand can be reduced if the office equipment not in use are turned off, unplugged or disconnected. This also led to a significant reduction in greenhouse gases emission. This finding is particularly important for good energy demand management, as more and more modern electric appliances are introduced into the local commercial buildings which are contributing to the increase in energy consumption and subsequently, the electric bill.

Qi Jie Kwong; Sind Hoi Goh; Nor Mariah Adam; Vijay R. Raghavan

2014-01-01T23:59:59.000Z

363

Federal Energy Management Program: Operations and Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Support to someone by E-mail Management Support to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Management Support on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Management Support on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Google Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Delicious Rank Federal Energy Management Program: Operations and Maintenance Management Support on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Management Support on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

364

Records Management Specialist  

Energy.gov (U.S. Department of Energy (DOE))

A successful candidate in this position will serve as a Records Management Specialist in the Richland Operations Office (RL), Assistant Manager for Mission Support (AMMS), Infrastructure, Services...

365

Renae Speck Commercialization Manager  

NLE Websites -- All DOE Office Websites (Extended Search)

Manager Renae Speck, Ph.D is a Commercialization Manager in the Office of Technology Transfer in the Partnership Directorate at the United States Department of Energy's Oak...

366

Workforce Management Office  

Office of Energy Efficiency and Renewable Energy (EERE)

The Workforce Management Office provides leadership, policy guidance, and technical advice to Office of Energy Efficiency and Renewable Energy (EERE) managers, supervisors, and employees on a broad...

367

Contract/Project Management  

Energy Savers (EERE)

1 st Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

368

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 First Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2013 Target FY 2013 Final FY...

369

Project Management Methodology  

Energy.gov (U.S. Department of Energy (DOE))

The Project Management Coordination Office (PMCO) provides the tools and guidance necessary to ensure consistent and effective management oversight of performer performance and consolidated...

370

Project Management Coordination Office  

Energy.gov (U.S. Department of Energy (DOE))

The Project Management Coordination Office (PMCO) provides guidance, leadership, training, and tools to Office of Energy Efficiency and Renewable Energy (EERE) management and the field in the area...

371

Stormwater Management Program (Pennsylvania)  

Energy.gov (U.S. Department of Energy (DOE))

Stormwater Management program of the Department of Environmental Protection's Bureau of Conservation and Restoration administers the rules and regulations for stormwater management for Pennsylvania...

372

Management of Nuclear Materials  

Directives, Delegations, and Requirements

To establish requirements for the lifecycle management of DOE owned and/or managed accountable nuclear materials. Cancels DOE O 5660.1B.

2009-08-17T23:59:59.000Z

373

scriptEnv - loading modules before starting a script  

NLE Websites -- All DOE Office Websites (Extended Search)

scriptEnv - loading modules before starting a script scriptEnv - loading modules before starting a script scriptEnv - loading modules before starting a script In some cases a script needs to load modules before the script can be executed, but it can often be inconvenient or impossible to provide wrapper scripts which load the needed modules. CGI scripts on the gpweb resources or in the NERSC portal environment which require the genepool-specific python/perl/R or databases configuration modules are a strong example of this. NERSC provides the scriptEnv as a custom drop-in replacement for /usr/bin/env. scriptEnv loads your selected modules to allow your scripts to run easily and reproducibly. After constructing your scriptEnv, you only need replace the shebang line of your script to use your custom scriptEnv

374

Load Balancing Of Parallel Monte Carlo Transport Calculations  

National Nuclear Security Administration (NNSA)

Load Balancing Of Parallel Load Balancing Of Parallel Monte Carlo Transport Calculations R.J. Procassini, M. J. O'Brien and J.M. Taylor Lawrence Livermore National Laboratory, P. O. Box 808, Livermore, CA 94551 The performance of parallel Monte Carlo transport calculations which use both spatial and particle parallelism is increased by dynamically assigning processors to the most worked domains. Since the particle work load varies over the course of the simulation, each cycle this algorithm determines if dynamic load balancing would speed up the calculation. If load balancing is required, a small number of particle communications are initiated in order to achieve load balance. This method has decreased the parallel run time by more than a factor of three for certain criticality

375

Cluster-Based Load Balancing Algorithms for Grids  

E-Print Network (OSTI)

E-science applications may require huge amounts of data and high processing power where grid infrastructures are very suitable for meeting these requirements. The load distribution in a grid may vary leading to the bottlenecks and overloaded sites. We describe a hierarchical dynamic load balancing protocol for Grids. The Grid consists of clusters and each cluster is represented by a coordinator. Each coordinator first attempts to balance the load in its cluster and if this fails, communicates with the other coordinators to perform transfer or reception of load. This process is repeated periodically. We analyze the correctness, performance and scalability of the proposed protocol and show from the simulation results that our algorithm balances the load by decreasing the number of high loaded nodes in a grid environment.

Payli, Resat Umit; Dagdeviren, Orhan

2011-01-01T23:59:59.000Z

376

Intermediate Strain-Rate Loading - Techniques and Applications  

SciTech Connect

A new test methodology is described which allows access to loading rates that lie between split Hopkinson bar and shock-loading techniques. Gas gun experiments combined with velocity interferometry techniques have been used to experimentally determine the intermediate strain-rate loading behavior of Coors AD995 alumina and Cercom silicon-carbide rods. Graded-density materials have been used as impactors; thereby eliminating the tension states generated by the radial stress components during the loading phase. Results of these experiments demonstrate that the time-dependent stress pulse generated during impact allows an efficient transition from the initial uniaxial strain loading to a uniaxial stress state as the stress pulse propagates through the rod. This allows access to intermediate loading rates over 5 x 10{sup 3}/s to a few times 10{sup 4}/s.

Chhabildas, L.C.; Reinhart, W.D.; Holland, K.G.

1999-07-22T23:59:59.000Z

377

WECS - load controlled pitch - variable load conversion to heat. Final report  

SciTech Connect

Load control circuitry was developed such that excess energy from a windmill, that would normally go back to the utility, be absorbed in thermal storage to heat domestic hot water. Also, associated with this objective is the development of instrumentation to measure the power curve of the windmill as a function of windspeed. An Enertech 4KW windmill and related equipment was used to meet this objective.

Secord, N.

1983-11-26T23:59:59.000Z

378

Feature extraction and classification of load dynamic characteristics based on lifting wavelet packet transform in power system load modeling  

Science Journals Connector (OSTI)

Abstract Load dynamic characteristics classification and synthesis is the main approach to solve the problem of load time-variation. The basis and prerequisite of load dynamic characteristics classification is load dynamic characteristics feature extraction. Load model parameter space or the model response space gained by a standard voltage excitation is usually selected as the feature vector space in current practice of load dynamic characteristics feature extraction. However, both methods need to determine the load model structure and identify the model parameters. It would increase not only calculation error but also calculation time in the process of load model structure determination and parameter identification. Then the accuracy of the final classification results would be affected. It is reasonable and scientific to extract feature vector space of load dynamic characteristics directly from the measured response space. In this paper, a feature extraction method based on lifting wavelet packet transform is proposed for load dynamic characteristics classification. The load measured current response data is decomposed and reconstructed, then the wavelet packet coefficients can be extracted to construct energy moment based feature vector. On this basis, the load dynamic characteristics classification can be realized using fuzzy c-means (FCM) method. Finally, the validity and practicality of the proposed method have been proved by feature extraction and classification of dynamic simulation data acquired using Matlab/Simulink and field measurement data. Compared with traditional wavelet packet transform, the lifting wavelet packet transform has shown advantages both in computational speed and reconstruction error and can improve the accuracy of load dynamic characteristics classification.

Zhenshu Wang; Shaorun Bian; Ming Lei; Chuangang Zhao; Yan Liu; Zhifan Zhao

2014-01-01T23:59:59.000Z

379

Industrial Load Shaping: A Utility Strategy to Deal with Competition  

E-Print Network (OSTI)

INDUSTRIAL LOAD SHAPING: A UTILITY STRATEGY TO DEAL WITH COMPETITION DONALD BULES BULES AND ASSOCIATES SAN FRANCISCO, ABSTRACT In recent years competition from various sources such as cogeneration and bypass has led many utilities... to refocus attention on their large industrial customers. Industrial load shaping is a customized program involving cost-effective process modifications and operational changes which result in a restructuring of the electric load profile of individual...

Bules, D.

380

,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected...  

U.S. Energy Information Administration (EIA) Indexed Site

and 2007 Base Year)" ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid",,,," " ,"Projected Year...

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected...  

U.S. Energy Information Administration (EIA) Indexed Site

and 2008 Base Year)" ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid",,,," " ,"Projected Year...

382

,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected...  

U.S. Energy Information Administration (EIA) Indexed Site

and 2003 Base Year)" ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,"Texas Power Grid","Western Power Grid" ,"Projected Year...

383

,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected...  

U.S. Energy Information Administration (EIA) Indexed Site

and 2009 Base Year)" ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid",,,," " ,"Projected Year...

384

,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected...  

U.S. Energy Information Administration (EIA) Indexed Site

Base Year)",,,," " ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,"Texas Power Grid","Western Power Grid" ,"Projected Year...

385

,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected...  

U.S. Energy Information Administration (EIA) Indexed Site

and 2004 Base Year)" ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,"Texas Power Grid","Western Power Grid" ,"Projected Year...

386

Development of an Accelerated Ash-Loading Protocol for Diesel...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Ash Loading Protocol Rapid Aging and Poisoning Protocols to AssessFuel and Lube Effects on Diesel Aftertreatment (Agreement 13415) Neutron Imaging of Advanced Engine Technologies...

387

HVAC Loads in High-Performance Homes (Presentation)  

SciTech Connect

This presentation was delivered at the ASHRAE 2010 Annual Summer Conference on June 27, 2010, and addresses humidity and AC loads in energy efficient houses.

Christensen, D.; Fang, X.; Winkler, J.

2010-06-27T23:59:59.000Z

388

Healthcare Energy: Spotlight on Lighting and Other Electric Loads  

Energy.gov (U.S. Department of Energy (DOE))

The Building Technologies Office conducted a healthcare energy end-use monitoring project for two sites. Read details about the lighting and plug load energy results.

389

Averaged equations for Josephson junction series arrays with LRC load  

E-Print Network (OSTI)

We derive the averaged equations describing a series array of Josephson junctions shunted by a parallel inductor-resistor-capacitor load. We assume that the junctions have negligable capacitance ($\\beta = 0$), and derive averaged equations which turn out to be completely tractable: in particular the stability of both in-phase and splay states depends on a single parameter, $\\del$. We find an explicit expression for $\\delta$ in terms of the load parameters and the bias current. We recover (and refine) a common claim found in the technical literature, that the in-phase state is stable for inductive loads and unstable for capacitive loads.

Kurt Wiesenfeld; James W. Swift

1994-08-26T23:59:59.000Z

390

Utilizing Load Response for Wind and Solar Integration and Power...  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratory 1617 Cole Blvd., Golden, CO 80401 michael.milligan@nrel.gov Topics: Demand Response Power System Operations and Wind Energy Abstract Responsive load is still the...

391

,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected...  

U.S. Energy Information Administration (EIA) Indexed Site

January 23, 2008" ,"Next Update: October 2007" ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Council Region, " ,"2005...

392

Dynamic Power System Load -Estimation of Parameters from Operational Data.  

E-Print Network (OSTI)

??The significance of load modeling for voltage stability studies has been emphasized by several disturbances, which have taken place in the past years. They have… (more)

Romero Navarro, Ines

2005-01-01T23:59:59.000Z

393

Notes 04. Static load performance of plain journal bearings  

E-Print Network (OSTI)

The long and short bearing models. Pressure field and fluid film forces on short length journal bearings. Equilibrium condition, load capacity and the Sommerfeld number....

San Andres, Luis

2010-01-01T23:59:59.000Z

394

Carbon Monoxide Tolerant Electrocatalyst with Low Platinum Loading...  

NLE Websites -- All DOE Office Websites (Extended Search)

particle. When used as an electrocatalyst for the oxidation of fuel at a fuel cell anode, this structure exhibits low platinum loading and elevated tolerance to carbon...

395

Load Shedding Algorithm Using Voltage and Frequency Data.  

E-Print Network (OSTI)

??Under frequency load shedding schemes have been widely used, to restore power system stability post major disturbances. However, the analysis of recent blackouts suggests that… (more)

Joshi, Poonam

2007-01-01T23:59:59.000Z

396

Characterization of Dynamic Loads on Solar Modules with Respect...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

78 CHARACTERIZATION OF DYNAMIC LOADS ON SOLAR MODULES WITH RESPECT TO FRACTURE OF SOLAR CELLS Sascha Dietrich, Matthias Pander, Martin Sander, Matthias Ebert & Fraunhofer - Center...

397

Submitted to LLB highlights 2011 Doxorubicin Loaded Magnetic Polymersomes  

E-Print Network (OSTI)

Submitted to LLB highlights 2011 Doxorubicin Loaded Magnetic Polymersomes: Theranostic Nanocarriers for cancer diagnostics and treatment open the field of "theranostics", i.e. combination of imaging

398

California Customer Load Reductions during the Electricity Crisis...  

Open Energy Info (EERE)

Reductions during the Electricity Crisis: Did They Help to Keep the Lights On? Jump to: navigation, search Tool Summary LAUNCH TOOL Name: California Customer Load Reductions during...

399

Development of an Accelerated Ash-Loading Protocol for Diesel...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerated Ash-Loading Protocol for Diesel Particulate Filters Bruce G. Bunting and Todd J. Toops Oak Ridge National Laboratory Adam Youngquist and Ke Nguyen University of...

400

Harmonic Analysis of a Static VAR Compensated Mixed Load System.  

E-Print Network (OSTI)

??As power electronic based controllers and loads become more prevalent in power systems, there is a growing concern about how the harmonics generated by these… (more)

Ruckdaschel, James David

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Waste Loading Enhancements for Hanford Low-Activity Waste Glasses  

NLE Websites -- All DOE Office Websites (Extended Search)

WASTE LOADING ENHANCEMENTS FOR HANFORD LOW-ACTIVITY WASTE GLASSES Albert A. Kruger, Glass Scientist DOE-WTP Project Office Engineering Division US Department of Energy Richland,...

402

Load Expansion with Diesel/Gasoline RCCI for Improved Engine...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

with DieselGasoline RCCI for Improved Engine Efficiency and Emissions Load Expansion with DieselGasoline RCCI for Improved Engine Efficiency and Emissions This poster will...

403

IEEE TRANSACTIONS ON POWER ELECTRONICS, VOL. 25, NO. 4, APRIL 2010 981 Power Management of Wideband Code Division  

E-Print Network (OSTI)

of the RFPA for various RF transmit power levels. For example, for data transmission (high load), a WCDMA RFPA (RFPA) is the most power- consuming component in wireless handsets [1], [2]. With increased data rates affected by the RF load impedance and the supply voltage [5], [6]. An RFPA power management architecture

Popovic, Zoya

404

PROJECT MANAGEMENT PLANS Project Management Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT PLANS MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Section 4.2 of DOE Guide 430.1-3, DEACTIVATION IMPLEMENTATION GUIDE discusses the content and purpose of deactivation project management plans. It is presented as a suggested outline followed by other potential subjects. For the convenience of readers, that information is repeated below.

405

Estimating the Effect of Domestic Load and Renewable Supply Variability on Battery Capacity Requirements for Decentralized Microgrids  

Science Journals Connector (OSTI)

Abstract Large battery banks are a commonly considered alternative for local storage of volatile energy supply in decentralized grid management. In this paper the hypothetical case of an isolated community of 15 houses with direct access to a nearby set of wind turbines and a backup grid connection (e.g. ex-urban hamlet) is being considered. The question arises as to what size of battery, relative to household average daily consumption, should be installed in order to avoid excessively fast aging of said battery bank, i.e. to avoid the need to replace it faster than standard expected battery lifetime. The basic technology of the batteries addressed in this study is lithium ion phosphate. A dynamic modeling process of aging is implemented, along with realistic wind power data and a stochastic model of domestic load, with variable morning/evening peaks, weekend and seasonal effects. It was found that simulations using domestic load profiles and variability predict a significant reduction in expected battery state of health, for comparable average loads, than standard load cycles used for industrial testing, and that increased variability in average domestic load has a minor effect on the speed of state of health reduction. Furthermore a region of high sensitivity to overall battery bank size can be observed, which subsides over approx. 200 hours of average household consumption.

Malte Thomann; Florin Popescu

2014-01-01T23:59:59.000Z

406

Federal Energy Management Program: Energy Management Requirements by Law  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Management Energy Management Requirements by Law and Regulation to someone by E-mail Share Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Facebook Tweet about Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Twitter Bookmark Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Google Bookmark Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Delicious Rank Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Digg Find More places to share Federal Energy Management Program: Energy Management Requirements by Law and Regulation on AddThis.com... Requirements by Subject Requirements by Regulation

407

A Dynamic Attribute-Based Load Shedding and Data Recovery Scheme for Data Stream Management Systems.  

E-Print Network (OSTI)

??Data streams being transmitted over a network channel with capacity less than the data rate of the data streams is very common when using network… (more)

Ahuja, Amit

2006-01-01T23:59:59.000Z

408

Load balancing and data-management strategies in a multitenant database cluster  

Science Journals Connector (OSTI)

A multitenant database cluster is a data-storage subsystem for applications with multiclient architecture. Essentially, it may be regarded as an additional level of abstraction beyond the set of regular server...

E. A. Boitsov

2014-09-01T23:59:59.000Z

409

Minimization of cost, sediment load, and sensitivity to climate change in a watershed management application  

E-Print Network (OSTI)

the relative trade-offs of alternative stormwater BMP configurations. Ã? 2013 Elsevier Ltd. All rights reserved and transport of sediment and soil contaminants into surface water bodies. Even the relatively rural state of Vermont has 107 impaired water bodies. Of these, 17 are stormwater-impaired rivers and streams (VTDEC

Eppstein, Margaret J.

410

Active load management with advanced window wall systems: Research and industry perspectives  

E-Print Network (OSTI)

sustainability, energy- efficiency, and increased occupant amenity, comfort, and productivity will be the driving factors for these advanced facades

2002-01-01T23:59:59.000Z

411

Power Management for Alleviation of the Impact on PEM Fuel Cell due to Load Fluctuation  

Science Journals Connector (OSTI)

Transient impact on fuel cell system due to stack current fluctuation sometimes causes severe degradation of some performances such as voltage variation, oxygen starvation, anode/cathode pressure disturbance, membrane dryout and voltage reversal. As ...

Guidong Liu; Wensheng Yu; Zhishou Tu

2006-10-01T23:59:59.000Z

412

Active load management with advanced window wall systems: Research and industry perspectives  

E-Print Network (OSTI)

Electrochromic glazings are commercially available in Germany. US products are anticipated to enter the market

2002-01-01T23:59:59.000Z

413

Measuring cognitive load management in a traditional martial arts training model  

E-Print Network (OSTI)

of DOCTOR OF PHILOSOPHY Approved as to style and content by: _________________________ _________________________ William R. Nash Joyce E. Juntune (Chair of Committee.... (May 2004) Herbert N. Maier, B.S., University of Houston; M.S., Texas A&M University Chair of Advisory Committee: Dr. William R. Nash A training method utilized in a few martial arts was found to agree strongly with current cognitive psychology...

Maier, Herbert N.

2005-08-29T23:59:59.000Z

414

Improving Fuel Economy via Management of Auxiliary Loads in Fuel-Cell Electric Vehicles.  

E-Print Network (OSTI)

??The automotive industry is in a state of flux at the moment. Traditional combustion engine technologies are becoming challenged by newer, more efficient and environmentally… (more)

Lawrence, Christopher Paul

2007-01-01T23:59:59.000Z

415

Chemical Management Contacts  

Energy.gov (U.S. Department of Energy (DOE))

Contacts for additional information on Chemical Management and brief description on Energy Facility Contractors Group

416

telecommunications system management  

Science Journals Connector (OSTI)

Communications system management applied to telecommunications systems, facilities, equipment, and components. See communications system , comm...

2001-01-01T23:59:59.000Z

417

Career Map: Engineering Manager  

Energy.gov (U.S. Department of Energy (DOE))

The Wind Program's Career Map provides job description information for Engineering Manager positions.

418

PRC Contract Management Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Contract Management Team Members, Including Roles and Responsibilities ... 3 Contracting Officer ......

419

Environmental Best Management Practices  

E-Print Network (OSTI)

Environmental Best Management Practices for Virginia's Golf Courses Prepared by Virginia Golf Course Superintendents Association #12;#12;EnvironmEntal BEst managEmEnt PracticEs for virginia's golf III I am pleased to endorse the Environmental Best Management Practices for Virginia's Golf Courses

Liskiewicz, Maciej

420

Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours Docket No. EO-05-01. Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours. Arial photograph showing plant and location of predicted SO2 violations, predicted in 2000. Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours More Documents & Publications Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 3, 1, 2 SO2 Case Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 4, 1, 2 SO2 Case Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

LPP Risk Management Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

History and Process History and Process Slide 2 M E Environmental Management Environmental Management History ◦ Current Baseline Process Overview ◦ Identification ◦ Simulation ◦ Management Successes & Challenges Slide 3 M E Environmental Management Environmental Management Current Baseline Risks ◦ 1 Week Risk Summit held week of August 4 th , 2008 Broad representation from all levels of Isotek, DOE, PTC, and outside consultants Focused on risk and opportunity identification Included risk description, assumptions, and triggers No quantification or analysis No restrictions, constraints, or filtering HQ provided facilitator Prescribed format and capture methodology Slide 4 M E Environmental Management Environmental Management Current Baseline Risks ◦ Risk Summit Results

422

Environmental Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Management System Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous improvement of our environmental performance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Managing our effects on the environment We are committed to protecting the environment while conducting our national security and energy-related missions. Laboratory Environmental Governing Policy What is the Environmental Management System? It covers every program in the Laboratory

423

Office of Resource Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Resource Management Resource Management Home Sub Offices › Business Operations › Information Management › Human Resources and Administration Mission and Functions HSS Standard Operating Practices (For Internal Users Only) HSS Subject Matter Experts and Functional Points of Contacts Contact Us HSS Logo Office of Resource Management Direct Report to the Chief Health, Safety and Security Officer Mission and Functions Mission The Office of Resource Management supports the infrastructure of the Office of Health, Safety and Security (HSS) by providing balanced, unbiased, technically competent, and customer focused services in the areas of: (1) Financial Management, including budget formulation and execution; (2) Procurement Management, including contract and credit card programs; (3) Information Management, including technology-based solutions and programs; (4) Quality Assurance; (5) Human Resources, including recruitment and retention programs; (6) Administrative Services, including property management, travel, and work space management; and; (7) Strategic and Program Planning including performance and efficiency measures.

424

Used Fuel Management System Interface Analyses - 13578  

SciTech Connect

Preliminary system-level analyses of the interfaces between at-reactor used fuel management, consolidated storage facilities, and disposal facilities, along with the development of supporting logistics simulation tools, have been initiated to provide the U.S. Department of Energy (DOE) and other stakeholders with information regarding the various alternatives for managing used nuclear fuel (UNF) generated by the current fleet of light water reactors operating in the United States. An important UNF management system interface consideration is the need for ultimate disposal of UNF assemblies contained in waste packages that are sized to be compatible with different geologic media. Thermal analyses indicate that waste package sizes for the geologic media under consideration by the Used Fuel Disposition Campaign may be significantly smaller than the canisters being used for on-site dry storage by the nuclear utilities. Therefore, at some point along the UNF disposition pathway, there could be a need to repackage fuel assemblies already loaded and being loaded into the dry storage canisters currently in use. The implications of where and when the packaging or repackaging of commercial UNF will occur are key questions being addressed in this evaluation. The analysis demonstrated that thermal considerations will have a major impact on the operation of the system and that acceptance priority, rates, and facility start dates have significant system implications. (authors)

Howard, Robert; Busch, Ingrid [Oak Ridge National Laboratory, P.O. Box 2008, Bldg. 5700, MS-6170, Oak Ridge, TN 37831 (United States)] [Oak Ridge National Laboratory, P.O. Box 2008, Bldg. 5700, MS-6170, Oak Ridge, TN 37831 (United States); Nutt, Mark; Morris, Edgar; Puig, Francesc [Argonne National Laboratory (United States)] [Argonne National Laboratory (United States); Carter, Joe; Delley, Alexcia; Rodwell, Phillip [Savannah River National Laboratory (United States)] [Savannah River National Laboratory (United States); Hardin, Ernest; Kalinina, Elena [Sandia National Laboratories (United States)] [Sandia National Laboratories (United States); Clark, Robert [U.S. Department of Energy (United States)] [U.S. Department of Energy (United States); Cotton, Thomas [Complex Systems Group (United States)] [Complex Systems Group (United States)

2013-07-01T23:59:59.000Z

425

Comfort-constrained distributed heat pump management  

E-Print Network (OSTI)

This paper introduces the design of a demand response network control strategy aimed at thermostatically controlled electric heating and cooling systems in buildings. The method relies on the use of programmable communicating thermostats, which are able to provide important component-level state variables to a system-level central controller. This information can be used to build power density distribution functions for the aggregate heat pump load. These functions lay out the fundamental basis for the methodology by allowing for consideration of customer-level constraints within the system-level decision making process. The proposed strategy is then implemented in a computational model to simulate a distribution of buildings, where the aggregate heat pump load is managed to provide the regulation services needed to successfully integrate wind power generators. Increased exploitation of wind resources will place similarly themed ancillary services in high-demand, traditionally provided by dispatchable energy ...

Parkinson, Simon; Crawford, Curran; Djilali, Ned

2011-01-01T23:59:59.000Z

426

Cone Penetrometer Load Cell Temperature and Radiation Testing Results  

SciTech Connect

This report summarizes testing activities performed at the Pacific Northwest National Laboratory to verify the cone penetrometer load cell can withstand the tank conditions present in 241-AN-101 and 241-AN-106. The tests demonstrated the load cell device will operate under the elevated temperature and radiation levels expected to be encountered during tank farm deployment of the device.

Follett, Jordan R.

2013-08-28T23:59:59.000Z

427

Dimensional analysis of impulse loading resulting from detonation  

E-Print Network (OSTI)

Dimensional analysis of impulse loading resulting from detonation of shallow-buried charges Mica for the problem of impulse loading experienced by target structures (e.g. vehicle hull) due to detonation-overburden stretching and acceleration before the associated sand bubble bursts and venting of the gaseous detonation

Grujicic, Mica

428

Incentivizing Advanced Load Scheduling in Smart Homes , and David Irwin  

E-Print Network (OSTI)

Incentivizing Advanced Load Scheduling in Smart Homes Ye Xu , and David Irwin , and Prashant Shenoy Department of Electrical and Computer Engineering School of Computer Science University of Massachusetts Amherst ABSTRACT In recent years, researchers have proposed numerous advanced load scheduling algorithms

Massachusetts at Amherst, University of

429

Fetch Halting on Critical Load Misses Nikil Mehta,  

E-Print Network (OSTI)

Fetch Halting on Critical Load Misses Nikil Mehta, Brian Singer, R. Iris Bahar Division, such as loads that miss to main memory and floating point arithmetic operations, are primarily responsible to characterize critical instructions, our approach com- bines software profiling and hardware monitoring

DeHon, André

430

VEHICLE TRACKING USING MOBILE WIRELESS SENSOR NETWORKS DURING DYNAMIC LOAD  

E-Print Network (OSTI)

and put into service, engineers lack cost-effective methods for measuring the actual loads imposedVEHICLE TRACKING USING MOBILE WIRELESS SENSOR NETWORKS DURING DYNAMIC LOAD TESTING OF HIGHWAY in the understanding of vehicle-bridge interactions. Direct measurement of the complex coupling that naturally exists

Lynch, Jerome P.

431

PERFORMANCE OF BRIDGE TIMBER TIES UNDER STATIC AND DYNAMIC LOADING  

E-Print Network (OSTI)

PERFORMANCE OF BRIDGE TIMBER TIES UNDER STATIC AND DYNAMIC LOADING K.A. Soudki and S.H. Rizkalla Department of Civil Engineering, University of Manitoba, Winnipeg, Manitoba, R3T 2N2 and A.S. Uppal Bridges of treated timber bridge ties under different load levels. A portion of a prototype bridge deck, consisting

432

Passive detection of vehicle loading Troy R. McKaya  

E-Print Network (OSTI)

Passive detection of vehicle loading Troy R. McKaya , Carl Salvaggioa , Jason W. Faulringa , Philip-scale vehicle tests. The sensing system includes; infrared video cameras, triaxial accelerometers, microphones for characterizing the weight of a vehicle. The final sensing system will monitor multiple load indicators

Salvaggio, Carl

433

Load-Dependent Assembly of the Bacterial Flagellar Motor  

Science Journals Connector (OSTI)

...the motor at lower loads. Rough extrapolation of the data of Fig.-3 to zero...to the coverslip. Data analysis. Motor...calculated using power spectra of combined (x, y) data as described in reference...5-s. Relative loads for different bead...

Murray J. Tipping; Nicolas J. Delalez; Ren Lim; Richard M. Berry; Judith P. Armitage

2013-08-01T23:59:59.000Z

434

Programming Project : Admittance Matrix and Power/Load-Flow  

E-Print Network (OSTI)

Programming Project : Admittance Matrix and Power/Load-Flow EE 581 April 19, 2012 1 Introduction This project will be to develop your own power-flow (also known as load-flow) solver to study balanced, three-phase power systems in sinusoidal steady-state. The program will read in data from three files (bus, line

Wedeward, Kevin

435

Empirical Characterization and Modeling of Electrical Loads in Smart Homes  

E-Print Network (OSTI)

in data analysis: i) generating device-accurate synthetic traces of building electricity usage, and ii) filtering out loads that generate rapid and random power variations in building electricity data. Keywords--ElectricalEmpirical Characterization and Modeling of Electrical Loads in Smart Homes Sean Barker, Sandeep

Shenoy, Prashant

436

Extreme Loads for an Offshore Wind Turbine using Statistical  

E-Print Network (OSTI)

Extreme Loads for an Offshore Wind Turbine using Statistical Extrapolation from Limited Field Data models to establish extreme loads associated with return periods on the order of 20­50 years. Distribu- tions for the extreme mudline bending moment are established using parametric models. Long

Manuel, Lance

437

Ris-R-1111(EN) Ultimate Loading of Wind Turbines  

E-Print Network (OSTI)

-R-1111(EN) 2 Abstract An extreme loading study has been conducted comprising a general wind climate the environmental wind climate. With the trend of persistently growing turbines, the extreme loading seems to become, and extreme wind events. Examples of extreme wind events are extreme mean wind speeds with a recurrence period

438

Loading Effect Correction for Real-Time Aethalometer Measurements of Fresh  

NLE Websites -- All DOE Office Websites (Extended Search)

Loading Effect Correction for Real-Time Aethalometer Measurements of Fresh Loading Effect Correction for Real-Time Aethalometer Measurements of Fresh Diesel Soot Title Loading Effect Correction for Real-Time Aethalometer Measurements of Fresh Diesel Soot Publication Type Journal Article Year of Publication 2007 Authors Jimenez, Jorge, Candis S. Claiborn, Timothy Larson, Timothy Gould, Thomas W. Kirchstetter, and Lara A. Gundel Journal Journal of the Air & Waste Management Association Volume 57 Issue 7 Pagination 868-873 Abstract In this study, a correction was developed for the aethalometer to measure real-time black carbon (BC) concentrations in an environment dominated by fresh diesel soot. The relationship between the actual mass-specific absorption co-efficient for BC and the BC-dependent attenuation coefficients was determined from experiments conducted in a diesel exposure chamber that provided constant concentrations of fine particulate matter (PM; PM2.5; PM <2.5 μm aerodynamic diameter) from diesel exhaust. The aethalometer reported BC concentrations decreasing with time from 48.1 to 31.5 μg m-3 when exposed to constant PM2.5 concentrations of 55 ± 1 μg m-3 and bscat 95 ± 3Mm-1 from diesel exhaust. This apparent decrease in reported light-absorbing PM concentration was used to derive a correction K (ATN) for loading of strong light-absorbing particles onto or into the aethalometer filter tape, which was a function of attenuation of light at 880 nm by the embedded particles.

439

Field Trial of a Low-Cost, Distributed Plug Load Monitoring System  

SciTech Connect

Researchers have struggled to inventory and characterize the energy use profiles of the ever-growing category of so-called miscellaneous electric loads (MELs) because plug-load monitoring is cost-prohibitive to the researcher and intrusive to the homeowner. However, these data represent a crucial missing link to our understanding of how homes use energy, and we cannot control what we do not understand. Detailed energy use profiles would enable the nascent automated home energy management (AHEM) industry to develop effective control algorithms that target consumer electronics and other plug loads. If utility and other efficiency programs are to incent AHEM devices, they need large-scale datasets that provide statistically meaningful justification of their investments by quantifying the aggregate energy savings achievable. To address this need, we have investigated a variety of plug-load measuring devices available commercially and tested them in the laboratory to identify the most promising candidates for field applications. The scope of this report centers around the lessons learned from a field validation of one proof-of-concept system, called Smartenit (formerly SimpleHomeNet). The system was evaluated based on the rate of successful data queries, reliability over a period of days to weeks, and accuracy. This system offers good overall performance when deployed with up to ten end nodes in a residential environment, although deployment with more nodes and in a commercial environment is much less robust. We conclude that the current system is useful in selected field research projects, with the recommendation that system behavior is observed over time.

Auchter, B.; Cautley, D.; Ahl, D.; Earle, L.; Jin, X.

2014-03-01T23:59:59.000Z

440

WIPP Mobile Loading Unit Contract - 8-27-12  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Awards Contract for WIPP Mobile Loading Unit Services DOE Awards Contract for WIPP Mobile Loading Unit Services Cincinnati, Ohio, August 27, 2012 - The U.S. Department of Energy (DOE) today awarded a competitive small business contract to Celeritex, LLC, (a Joint Venture between Project Services Group, LLC and DeNuke Contracting Services Inc.) of Suwanee, Georgia. The contract is to provide Mobile Loading Unit services in support of the National TRU Program and the DOE Carlsbad Field Office (CBFO) at the Waste Isolation Pilot Plant (WIPP) in New Mexico. The contract has a value of up to $17.8 million, with a three-year performance period and two- one year extension options. This contract was limited to Small Businesses. The Mobile Loading Unit contractor will load Contact Handled (CH) and Remote Handled (RH)

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Definition: Interruptible Load Or Interruptible Demand | Open Energy  

Open Energy Info (EERE)

Interruptible Load Or Interruptible Demand Interruptible Load Or Interruptible Demand Jump to: navigation, search Dictionary.png Interruptible Load Or Interruptible Demand Demand that the end-use customer makes available to its Load-Serving Entity via contract or agreement for curtailment.[1] View on Wikipedia Wikipedia Definition View on Reegle Reegle Definition No reegle definition available. Also Known As non-firm service Related Terms transmission lines, electricity generation, transmission line, firm transmission service, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Interruptible_Load_Or_Interruptible_Demand&oldid=502615"

442

Building Energy Software Tools Directory: TRACE Load 700  

NLE Websites -- All DOE Office Websites (Extended Search)

Load 700 Load 700 TRACE Load 700 logo. Use TRACE Load 700 software - the building and load design modules of TRACE 700, Trane Air Conditioning Economics - to evaluate the effect of building orientation, size, shape, and mass based on hourly weather data and the resulting heat-transfer characteristics of air and moisture. To assure calculation integrity, the program uses algorithms recommended by the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE). Choose from eight different ASHRAE cooling and heating methodologies, including the Exact Transfer Function. The program encourages "what if" analyses, allowing the user to enter construction details in any order and then easily change the resulting building model as the design progresses. Multiple project views and "drag-and-drop"

443

Loads Providing Ancillary Services: Review of International Experience |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loads Providing Ancillary Services: Review of International Loads Providing Ancillary Services: Review of International Experience Loads Providing Ancillary Services: Review of International Experience In this study, we examine the arrangements for and experiences of end-use loads providing ancillary services (AS) in five electricity markets: Australia, the United Kingdom (UK), the Nordic market, and the ERCOT and PJM markets in the United States. Our objective in undertaking this review of international experience was to identify specific approaches or market designs that have enabled customer loads to effectively deliver various ancillary services (AS) products. We hope that this report will contribute to the ongoing discussion in the U.S. and elsewhere regarding what institutional and technical developments are needed to ensure that

444

Loads Providing Ancillary Services: Review of International Experience |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loads Providing Ancillary Services: Review of International Loads Providing Ancillary Services: Review of International Experience Loads Providing Ancillary Services: Review of International Experience In this study, we examine the arrangements for and experiences of end-use loads providing ancillary services (AS) in five electricity markets: Australia, the United Kingdom (UK), the Nordic market, and the ERCOT and PJM markets in the United States. Our objective in undertaking this review of international experience was to identify specific approaches or market designs that have enabled customer loads to effectively deliver various ancillary services (AS) products. We hope that this report will contribute to the ongoing discussion in the U.S. and elsewhere regarding what institutional and technical developments are needed to ensure that

445

Behavior of plate trunnions subjected to shear loads  

SciTech Connect

The use of fabricated trunnions in heavy lift installation of offshore and marine structures is becoming widespread. This paper presents the results of a parametric study, with systematic variation of relevant geometric parameters, on the elasto-plastic responses of plate trunnions subjected to shear loads from the sling eyes. Two distinctive failure modes, associated with main plate dominated and shear plate/trunnion pipe dominated responses are identified and the corresponding results summarized. A proportional limit load, P{sub yl}, is defined for each specimen based on its load-displacement response. It is observed that a plate trunnion possesses significant reserve strength beyond its limit load and that current industry practice, which considers the shear plate only to transfer the total sling load into the main plate, is overly conservative.

Choo, Y.S.; Padmanaban, K.; Shanmugam, N.E.; Liew, J.Y.R. [National Univ. of Singapore (Singapore). Faculty of Engineering

1995-12-31T23:59:59.000Z

446

Impact load mitigation in sandwich beams using local resonators  

E-Print Network (OSTI)

Dynamic response of sandwich beams with resonators embedded in the cores subjected to impact loads is studied. Using finite element models the effectiveness of various local resonator frequencies under a given impact load is compared to the behavior of an equivalent mass beam. It is shown that addition of appropriately chosen local resonators into the sandwich beam is an effective method of improving its flexural bending behavior under impact loads. The effect of a given local resonance frequency under different impact load durations is also studied. It is demonstrated that the choice of appropriate local resonance frequency depends on the impact duration. Further, by performing transverse impact experiments, the finite element models are verified and the advantage of using internal resonators under impact loading conditions is demonstrated.

Sharma, B

2015-01-01T23:59:59.000Z

447

Short-Term Load Forecasting This paper discusses the state of the art in short-term load fore-  

E-Print Network (OSTI)

spectrum of time intervals. In therange of seconds, when load variationsare small and random, the automatic by a number of generation control functions such as hydro scheduling, unit commitment, hydro-ther- mal present, functions such as fuel, hydro, and maintenance scheduling are performed to ensure that the load

Gross, George

448

Federal Energy Management Program: Best Management Practice: Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Information and Education Programs to someone by E-mail Information and Education Programs to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Information and Education Programs on Facebook Tweet about Federal Energy Management Program: Best Management Practice: Information and Education Programs on Twitter Bookmark Federal Energy Management Program: Best Management Practice: Information and Education Programs on Google Bookmark Federal Energy Management Program: Best Management Practice: Information and Education Programs on Delicious Rank Federal Energy Management Program: Best Management Practice: Information and Education Programs on Digg Find More places to share Federal Energy Management Program: Best Management Practice: Information and Education Programs on AddThis.com...

449

Federal Energy Management Program: Best Management Practice: Commercial  

NLE Websites -- All DOE Office Websites (Extended Search)

Commercial Kitchen Equipment to someone by E-mail Commercial Kitchen Equipment to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Commercial Kitchen Equipment on Facebook Tweet about Federal Energy Management Program: Best Management Practice: Commercial Kitchen Equipment on Twitter Bookmark Federal Energy Management Program: Best Management Practice: Commercial Kitchen Equipment on Google Bookmark Federal Energy Management Program: Best Management Practice: Commercial Kitchen Equipment on Delicious Rank Federal Energy Management Program: Best Management Practice: Commercial Kitchen Equipment on Digg Find More places to share Federal Energy Management Program: Best Management Practice: Commercial Kitchen Equipment on AddThis.com... Sustainable Buildings & Campuses

450

Federal Energy Management Program: Best Management Practice: Alternate  

NLE Websites -- All DOE Office Websites (Extended Search)

Alternate Water Sources to someone by E-mail Alternate Water Sources to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Alternate Water Sources on Facebook Tweet about Federal Energy Management Program: Best Management Practice: Alternate Water Sources on Twitter Bookmark Federal Energy Management Program: Best Management Practice: Alternate Water Sources on Google Bookmark Federal Energy Management Program: Best Management Practice: Alternate Water Sources on Delicious Rank Federal Energy Management Program: Best Management Practice: Alternate Water Sources on Digg Find More places to share Federal Energy Management Program: Best Management Practice: Alternate Water Sources on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Greenhouse Gases

451

A Note on On-line Load Balancing for Related Machines  

E-Print Network (OSTI)

and the load of entire schedule s as follows: load(s;i) = 1 vi X s(j)=i pj; Load(s) = maxi load(s;i) It is easy by the machines with speed larger than v if the load cannot exceed .) The following observation is immediateA Note on On-line Load Balancing for Related Machines Piotr Berman Marek Karpinski y Abstract We

Eckmiller, Rolf

452

Fusing Integration Test Management with Change Management  

E-Print Network (OSTI)

- 1 - Infuse: Fusing Integration Test Management with Change Management Gail E. Kaiser* Dewayne E, NJ 07974 Murray Hill, NJ 07974 Infuse is an experimental software development environment focusing the change set into the baseline. We have previously described how Infuse enforces static consistency at each

Perry, Dewayne E.

453

Federal Energy Management Program: Energy Management Guidance  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance Guidance The Federal Energy Management Program (FEMP) provides guidance on Federal laws and regulations related to energy management. General Guidance for Facilities Overview of Federal Energy Management Policy and Mandates: Guidance document outlining Federal energy management goals and requirements for Federal energy managers. Sustainability Requirement Crosswalk: Crosswalk of sustainability and energy goals and targets within executive orders and other statutes. Guidelines Establishing Criteria for Excluding Buildings from the Energy Performance Requirements of Section 543 of the National Energy Conservation Policy Act as Amended by the Energy Policy Act of 2005 (EPAct 2005): Guidelines that established criteria for exclusions from the energy performance requirement for a fiscal year or any Federal building or collection of Federal buildings within the statutory framework provided by the law.

454

Efficient approaches for the robust network loading problem  

E-Print Network (OSTI)

telecommunications, transportation, and energy management, among many others. Accordingly ...... shed light on the following issues. First, affine routing is ...

2014-10-14T23:59:59.000Z

455

Water Energy Load Profiling (WELP) Tool | Open Energy Information  

Open Energy Info (EERE)

Water Energy Load Profiling (WELP) Tool Water Energy Load Profiling (WELP) Tool Jump to: navigation, search Tool Summary Name: Water Energy Load Profiling (WELP) Tool Agency/Company /Organization: California Public Utilities Commission (CPUC) Sector: Energy, Water Focus Area: Energy Efficiency, - Embodied Energy, Water Conservation Phase: Determine Baseline, "Evaluate Effectiveness and Revise" is not in the list of possible values (Bring the Right People Together, Create a Vision, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes, Evaluate Effectiveness and Revise as Needed) for this property. Topics: GHG inventory, Policies/deployment programs, Resource assessment, Background analysis

456

Dynamic load measurement on an LPG carrier during voyage  

SciTech Connect

There are few actual ship measurement data showing the propriety of the design loads given by classification societies rules or other relevant rules. Therefore, the authors measured acceleration of ship motion and fluctuating loads on tank supports and chocks of a 75,000 m{sup 3} LPG carrier during her voyage. This paper introduces the subject ship and typical measurement results over about 1.3 years. From the analysis of these data, the authors have made clear the amount of frequency of fluctuating loads during actual navigation and ascertained the propriety of the ship`s design base.

Kamoi, Noriyuki; Taniguchi, Tomokazu; Kiso, Takashi; Kada, Kazuo; Motoi, Tatsuya; Nakamura, Shinichi [Kawasaki Heavy Industries, Ltd., Kobe (Japan)

1994-12-31T23:59:59.000Z

457

Universal Behavior of Load Distribution in Scale-Free Networks  

Science Journals Connector (OSTI)

We study a problem of data packet transport in scale-free networks whose degree distribution follows a power law with the exponent ?. Load, or “betweenness centrality,” of a vertex is the accumulated total number of data packets passing through that vertex when every pair of vertices sends and receives a data packet along the shortest path connecting the pair. It is found that the load distribution follows a power law with the exponent ??2.2(1), insensitive to different values of ? in the range, 2load exponent is a universal quantity to characterize scale-free networks.

K.-I. Goh; B. Kahng; D. Kim

2001-12-12T23:59:59.000Z

458

Vencon Management Inc | Open Energy Information  

Open Energy Info (EERE)

Vencon Management Inc Vencon Management Inc Address 65 West 55th Street Place New York, New York Zip 10019 Region Northeast - NY NJ CT PA Area Product Venture capital firm investing primarily in green technology Phone number (212) 581-8787 Website http://home.att.net/~vencon/ho Coordinates 40.7627527°, -73.9774459° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.7627527,"lon":-73.9774459,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

459

Century Asset Management | Open Energy Information  

Open Energy Info (EERE)

Asset Management Asset Management Place Sydney, New South Wales, Australia Zip 2000 Sector Solar, Vehicles Product String representation "Sydney based in ... mpleted assets." is too long. Coordinates -33.869629°, 151.206955° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-33.869629,"lon":151.206955,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

460

Climate Leaders Management | Open Energy Information  

Open Energy Info (EERE)

Climate Leaders Management Climate Leaders Management Place Boulder, Colorado Zip 80304 Product Climate Leaders Fund (CLF) is an investment vehicle in the climate change arena. CLF will invest in the massive infrastructure and manufacturing improvements. Coordinates 42.74962°, -109.714163° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.74962,"lon":-109.714163,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Electricity Demand and Energy Consumption Management System  

E-Print Network (OSTI)

This project describes the electricity demand and energy consumption management system and its application to the Smelter Plant of Southern Peru. It is composted of an hourly demand-forecasting module and of a simulation component for a plant electrical system. The first module was done using dynamic neural networks, with backpropagation training algorithm; it is used to predict the electric power demanded every hour, with an error percentage below of 1%. This information allows management the peak demand before this happen, distributing the raise of electric load to other hours or improving those equipments that increase the demand. The simulation module is based in advanced estimation techniques, such as: parametric estimation, neural network modeling, statistic regression and previously developed models, which simulates the electric behavior of the smelter plant. These modules allow the proper planning because it allows knowing the behavior of the hourly demand and the consumption patterns of the plant, in...

Sarmiento, Juan Ojeda

2008-01-01T23:59:59.000Z

462

Plan - Data Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Plan Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Plans NASA's Terrestrial Ecology Program now requires that each proposal include a Data Management Plan (DMP) of up to two pages. A DMP for a proposal is a brief document that outlines what you will do with your data during and after your research, to ensure your data will be safe, documented, and accessible now and in the future. A DMP - developed early and used throughout the research project - will increase research efficiency by making the data understandable and usable in the future and

463

Depleted Uranium Hexafluoride Management  

NLE Websites -- All DOE Office Websites (Extended Search)

for for DUF 6 Conversion Project Environmental Impact Statement Scoping Meetings November/December 2001 Overview Depleted Uranium Hexafluoride (DUF 6 ) Management Program DUF 6 EIS Scoping Briefing 2 DUF 6 Management Program Organizational Chart DUF 6 Management Program Organizational Chart EM-10 Policy EM-40 Project Completion EM-20 Integration EM-50 Science and Technology EM-31 Ohio DUF6 Management Program EM-32 Oak Ridge EM-33 Rocky Flats EM-34 Small Sites EM-30 Office of Site Closure Office of Environmental Management EM-1 DUF 6 EIS Scoping Briefing 3 DUF 6 Management Program DUF 6 Management Program * Mission: Safely and efficiently manage the DOE inventory of DUF 6 in a way that protects the health and safety of workers and the public, and protects the environment DUF 6 EIS Scoping Briefing 4 DUF 6 Inventory Distribution

464

Computerized Maintenance Management Systems  

Energy.gov (U.S. Department of Energy (DOE))

Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

465

Managing Director Buildings, Transportation  

E-Print Network (OSTI)

Site Development Will Terris Manager Gardening Maintenance Jim Gish Manager Landscape Specialty Tegwyn Maintenance and project Delivery Scott Sherwood Director Transportation Services Glenl Wear Director Grounds Supervisor Specialty Crews 17 Area supervisors Custodial Maintenance Charles Anderson Supervisor Activity

Seamons, Kent E.

466

Environmental Management System Plan  

E-Print Network (OSTI)

management Water conservation LBNL’s approach to sustainable environmentalWater Discharges) of Introduction Environmental Managementenvironmental compliance programs, such as air and water quality, as well as less traditional programs, such as wildland fire management,

Fox, Robert

2009-01-01T23:59:59.000Z

467

Management of Nuclear Materials  

Directives, Delegations, and Requirements

To establish requirements for the lifecycle management of DOE owned and/or managed accountable nuclear materials. Cancels DOE O 410.2. Admin Chg 1 dated 4-10-2014, cancels DOE O 410.2.

2009-08-17T23:59:59.000Z

468

Improving Project Management  

Energy.gov (U.S. Department of Energy (DOE))

On December 19, 2014, the Energy Department released its "Improving Project Management" report, a roadmap to transformation in funding, culture, project ownership, independent oversight and front-end planning from experienced project management leaders.

469

DECENTRALIZED WASTEWATER MANAGEMENT  

E-Print Network (OSTI)

1 DECENTRALIZED WASTEWATER MANAGEMENT: A GUIDEBOOK FOR GEORGIA COMMUNITIES Katie Sheehan wastewater treatment technologies. www.njunsystems.com Version 1.0, April 2013 #12; 2 DECENTRALIZED WASTEWATER MANAGEMENT: A GUIDEBOOK FOR GEORGIA COMMUNITIES PART ONE: BACKGROUND, ISSUES, AND PROGRAM

Rosemond, Amy Daum

470

Information Technology Project Management  

Directives, Delegations, and Requirements

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

2012-12-03T23:59:59.000Z

471

Information Technology Project Management  

Directives, Delegations, and Requirements

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1, dated 1-16-2013, cancels DOE O 415.1.

2012-12-03T23:59:59.000Z

472

COMPREHENSIVE LEGACY MANAGEMENT  

Office of Legacy Management (LM)

Comprehensive Legacy Management and Institutional Controls Plan U.S. Department of Energy Volume I-Legacy Management Plan Doc. No. S03496-8.0-Final Page 6 January 2015...

473

Risk Management Guide  

Directives, Delegations, and Requirements

This Guide provides non-mandatory risk management approaches for implementing the requirements of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. Cancels DOE G 413.3-7.

2011-01-18T23:59:59.000Z

474

Best Environmental Management Practices  

E-Print Network (OSTI)

Best Environmental Management Practices Farm Animal Production Disposal of Farm Medical Wastes Dan Vitamins and minerals Topical Medications Sprays Dewormers Ointments #12;Best Environmental Management of environmental contamination with chemicals or infectious agents. These include, among others: Injectable

475

Program Management | Department of Energy  

Energy Savers (EERE)

Management Program Management The Oak Ridge Office of Environmental Management is located in the Joe L. Evins Federal Building in Oak Ridge, Tennessee. The Oak Ridge Office of...

476

Enhancement of loading capacity of distribution system through distributed generator placement considering techno-economic benefits with load growth  

Science Journals Connector (OSTI)

Abstract Load growth in a system is a natural phenomenon. With the increase in load demand, system power loss and voltage drop increases. Distributed generators (DGs) are one of the best solutions to cope up with the load growth if they are allocated appropriately in the distribution system. In this work, optimal size and location of multiple \\{DGs\\} are found to cater the incremental load on the system and minimization of power loss without violating system constraints. For this a predetermined annual load growth up to five years is considered with voltage regulation as a constraint. The particle swarm optimization with constriction factor approach is applied to determine the optimum size and location with multiple DGs. To see the effect of load growth on system, 33-node IEEE standard test case is considered. It is observed that with the penetration of multiple number of \\{DGs\\} in distribution system, there is great improvement in several distribution system parameters. Moreover, the loading capacity of distribution system is enhanced through DG placement and its techno-economic benefits are also established.

Khyati D. Mistry; Ranjit Roy

2014-01-01T23:59:59.000Z

477

Conservation and drought management  

E-Print Network (OSTI)

Fall 2012 tx H2O 5 Column by Dr. Calvin Finch, Water Conservation and Technology Center director Conservation and Drought Management WAT E R CONSERVATION & TECHNOLOGY CENTER Securing Our Water Future Water conservation and drought... management are related, but they are not the same. Water conservation is a long-term e#27;ort to reduce the amount of water it takes to manufacture goods, manage households and care for landscapes. Drought management is water-use rules initiated to deal...

Finch, Calvin

2012-01-01T23:59:59.000Z

478

Portfolio Manager Overview Presentation  

Energy.gov (U.S. Department of Energy (DOE))

This presentation, given through the DOE's Technical Assitance Program (TAP), provides information on the Portfolio Manager Overview

479

Benchmarking Corporate Energy Management  

E-Print Network (OSTI)

BENCHMARKING CORPORATE ENERGY MANAGEMENT Dr. Douglas L. Norland Director of Research and Industrial Programs Alliance to Save Energy Washington, DC ABSTRACT There is growing interest among energy managers in finding out how their company...BENCHMARKING CORPORATE ENERGY MANAGEMENT Dr. Douglas L. Norland Director of Research and Industrial Programs Alliance to Save Energy Washington, DC ABSTRACT There is growing interest among energy managers in finding out how their company...

Norland, D. L.

480

Maintenance and Veg Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure projects Interconnection OASIS OATT Reauthorization of Transmission Line Permits, Maintenance and Vegetation Management on Forest Service Lands in Colorado,...

Note: This page contains sample records for the topic "a-lm load management" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Management Transition Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Records and Information Records and Information Management Transition Guidance November 2013 Records and Information Management Transition Guidance i Records and Information Management Transition Guidance Table of Contents Executive Summary ........................................................................................................................ 1 1.0 Introduction and Purpose ..................................................................................................... 1 LM Records Functions ................................................................................................................ 1 2.0 The Records Life Cycle ....................................................................................................... 2 3.0 Organizational Responsibilities ........................................................................................... 2

482

Sport Management Academic Offerings  

E-Print Network (OSTI)

production and programming of events; marketing and public relations; technological operations management Exploration of a topic (to be determined) not covered by the standard curriculum but of interest to faculty and sponsoring events. Management process, including theory of management and practical applications within

Raina, Ramesh

483

Financial Management Oversight  

Directives, Delegations, and Requirements

The Order defines requirements for effective financial management and adherence to DOE and applicable external financial management requirements and sets forth standards for ensuring the integrity and responsiveness of financial management and the accuracy and reliability of DOEs financial statements. Cancels DOE O 2200.13.

2006-08-31T23:59:59.000Z

484

Decentralized customerlevel under frequency load shedding in Switzerland  

Open Energy Info (EERE)

customerlevel under frequency load shedding in Switzerland customerlevel under frequency load shedding in Switzerland (Smart Grid Project) Jump to: navigation, search Project Name Decentralized customerlevel under frequency load shedding in Switzerland Country Switzerland Coordinates 46.818188°, 8.227512° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.818188,"lon":8.227512,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

485

Warding Off Energy Vampires and Phantom Loads | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Warding Off Energy Vampires and Phantom Loads Warding Off Energy Vampires and Phantom Loads Warding Off Energy Vampires and Phantom Loads October 31, 2013 - 1:45pm Addthis This Halloween, keep energy vampires at bay -- while saving energy and money -- with these home energy efficiency tricks. | Infographic by Sarah Gerrity, Energy Department This Halloween, keep energy vampires at bay -- while saving energy and money -- with these home energy efficiency tricks. | Infographic by Sarah Gerrity, Energy Department Amy Royden-Bloom State Energy Program Supervisor Amy Kidd Project Officer, State Energy Program Ghosts and goblins may only come out on Halloween, but energy vampires and phantom loads lurk in our homes and offices all year long. Energy vampires are appliances or other plugged-in devices that draw energy, or

486

Electric Load vs Time: Complicated World, Complicated Model  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Load vs Time: Complicated World, Complicated Model Electric Load vs Time: Complicated World, Complicated Model Speaker(s): Phillip Price Date: March 7, 2013 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Phillip Price "How much energy did I save by changing the operation of my building yesterday?" That turns out to be a very hard question to answer: you need to know how much energy you would have used under normal operations (the "baseline"), a number you can predict but not measure. In this talk we focus specifically on electrical energy ("electric load") in commercial buildings. Often the load can be broken down into several components that are superimposed on each other: a recurring weekly pattern, an effect of outdoor air temperature, and so on. Some buildings have patterns that are

487

AEDG Implementation Recommendations: Cooling and Heating Loads | Building  

NLE Websites -- All DOE Office Websites (Extended Search)

Cooling and Heating Loads Cooling and Heating Loads The Advanced Energy Design Guide (AEDG) for Small Office Buildings, 30% series, seeks to achieve 30% savings over ASHRAE Standard 90.1-1999. This guide focuses on improvements to small office buildings, less than 20,000ft2. The recommendations in this article are adapted from the implementation section of the guide and focus on heating and cooling system design loads for the purpose of sizing systems and equipment should be calculated in accordance with generally accepted engineering standards and handbooks such as ASHRAE Handbook--Fundamentals. Publication Date: Wednesday, May 13, 2009 air_cooling_and_heating_loads.pdf Document Details Affiliation: DOE BECP Focus: Compliance Building Type: Commercial Code Referenced: ASHRAE Standard 90.1-1999

488

A detailed loads comparison of three building energy modeling programs:  

NLE Websites -- All DOE Office Websites (Extended Search)

detailed loads comparison of three building energy modeling programs: detailed loads comparison of three building energy modeling programs: EnergyPlus, DeST and DOE-2.1E Title A detailed loads comparison of three building energy modeling programs: EnergyPlus, DeST and DOE-2.1E Publication Type Journal Year of Publication 2013 Authors Zhu, Dandan, Tianzhen Hong, Da Yan, and Chuang Wang Date Published 05/2013 Keywords building energy modeling program, building thermal loads, comparison, dest, DOE-2.1E, energyplus Abstract Building energy simulation is widely used to help design energy efficient building envelopes and HVAC systems, develop and demonstrate compliance of building energy codes, and implement building energy rating programs. However, large discrepancies exist between simulation results from different building energy modeling programs (BEMPs). This leads many users and stakeholders

489

Non-Intrusive Load Monitoring - Recent Advances and Existing Challenges  

NLE Websites -- All DOE Office Websites (Extended Search)

Non-Intrusive Load Monitoring - Recent Advances and Existing Challenges Non-Intrusive Load Monitoring - Recent Advances and Existing Challenges Speaker(s): Hampden Kuhns Date: May 10, 2010 - 12:00pm Location: 90-3122 Non-Intrusive Load Monitoring (NILM) describes the process of disaggregating multiple energy loads on a single circuit using signal processing techniques. The granular output of this analysis (much like an itemized phone bill) can help rate payers identify inefficiencies in their buildings and promote cost-effective energy efficiency actions. The concepts behind NIALM were originally developed in the late 1980s by George Hart of MIT and commercialized by Enetics Inc, but hardware expense, accuracy, and detection limit issues have hampered its large scale adoption. This presentation discusses the several steps of the original

490

Used Nuclear Fuel Loading and Structural Performance Under Normal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Fuel Loading and Structural Performance Under Normal Nuclear Fuel Loading and Structural Performance Under Normal Conditions of Transport - Modeling, Simulation and Experimental Integration RD&D Plan Used Nuclear Fuel Loading and Structural Performance Under Normal Conditions of Transport - Modeling, Simulation and Experimental Integration RD&D Plan Used nuclear fuel (UNF) must maintain its integrity during the storage period in such a way that it can withstand the physical forces of handling and transportation associated with restaging the fuel and transporting it to treatment or recycling facilities, or to a geologic repository. This RD&D plan describes a methodology, including development and use of analytical models, to evaluate loading and associated mechanical responses of UNF rods and key structural components. The plan objective is to

491

California Customer Load Reductions during the Electricity Crisis: Did They  

Open Energy Info (EERE)

California Customer Load Reductions during the Electricity Crisis: Did They California Customer Load Reductions during the Electricity Crisis: Did They Help to Keep the Lights On? Jump to: navigation, search Tool Summary LAUNCH TOOL Name: California Customer Load Reductions during the Electricity Crisis: Did They Help to Keep the Lights On? Focus Area: Energy Efficiency Topics: Socio-Economic Website: eetd.lbl.gov/ea/ems/reports/49733.pdf Equivalent URI: cleanenergysolutions.org/content/california-customer-load-reductions-d Language: English Policies: Regulations Regulations: Mandates/Targets This report details the predicted electricity shortages and blackouts in California (summer 2001) that never occured, in part due to energy conservation measures taken on by the people of California. Intense media coverage and information campaigns about energy efficiency as well as

492

Warding Off Energy Vampires and Phantom Loads | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Warding Off Energy Vampires and Phantom Loads Warding Off Energy Vampires and Phantom Loads Warding Off Energy Vampires and Phantom Loads October 31, 2013 - 1:45pm Addthis This Halloween, keep energy vampires at bay -- while saving energy and money -- with these home energy efficiency tricks. | Infographic by Sarah Gerrity, Energy Department This Halloween, keep energy vampires at bay -- while saving energy and money -- with these home energy efficiency tricks. | Infographic by Sarah Gerrity, Energy Department Amy Royden-Bloom State Energy Program Supervisor Amy Kidd Project Officer, State Energy Program Ghosts and goblins may only come out on Halloween, but energy vampires and phantom loads lurk in our homes and offices all year long. Energy vampires are appliances or other plugged-in devices that draw energy, or

493

Incomplete Mixing, Intermittency and Fluctuating Toxic Load Measurements in  

NLE Websites -- All DOE Office Websites (Extended Search)

Incomplete Mixing, Intermittency and Fluctuating Toxic Load Measurements in Incomplete Mixing, Intermittency and Fluctuating Toxic Load Measurements in Indoor Plumes Speaker(s): David J. Wilson Date: October 19, 2007 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Richard Sextro Why have people been able to get away with ignoring intermittency (periods of zero concentration or zero turbulent temperature difference) in heat and mass transfer for the past century? Why is intermittency crucially important in toxic load estimates for biological exposure? We will explore how a simple back-of-the-envelope model can be constructed for the respiration toxicology of concentration fluctuations at a fixed receptor (for example; your lungs). This simple model will show the origin of the toxic load exponent n=2.0 for concentration C in L=Cnt. An extensive set of

494

Used Nuclear Fuel Loading and Structural Performance Under Normal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Used Nuclear Fuel Loading and Structural Performance Under Normal Used Nuclear Fuel Loading and Structural Performance Under Normal Conditions of Transport - Modeling, Simulation and Experimental Integration RD&D Plan Used Nuclear Fuel Loading and Structural Performance Under Normal Conditions of Transport - Modeling, Simulation and Experimental Integration RD&D Plan Used nuclear fuel (UNF) must maintain its integrity during the storage period in such a way that it can withstand the physical forces of handling and transportation associated with restaging the fuel and transporting it to treatment or recycling facilities, or to a geologic repository. This RD&D plan describes a methodology, including development and use of analytical models, to evaluate loading and associated mechanical responses of UNF rods and key structural components. The plan objective is to

495

Front End Loading (FEL) and Process Engineering Workflow  

E-Print Network (OSTI)

Project development for the oil refining industry is typically performed through a process called Front End Loading (FEL). In recent years, the Process and Industrial Division of Burns and McDonnell has performed several ...

Spangler, Ryan

2005-05-20T23:59:59.000Z

496

Nutrient load analysis of Lago de Yojoa, Honduras  

E-Print Network (OSTI)

Lake Yojoa, Honduras is an important natural resource to the people of Honduras. The lake's water quality has been a controversial subject. This thesis describes a nutrient load analysis performed to gain a better understanding ...

Trate, Tia M. (Tia Marie)

2006-01-01T23:59:59.000Z

497

Laser ablation loading of a surface-electrode ion trap  

E-Print Network (OSTI)

We demonstrate loading by laser ablation of $^{88}$Sr$^+$ ions into a mm-scale surface-electrode ion trap. The laser used for ablation is a pulsed, frequency-tripled Nd:YAG with pulse energies of 1-10 mJ and durations of 3-5 ns. An additional laser is not required to photoionize the ablated material. The efficiency and lifetime of several candidate materials for the laser ablation target are characterized by measuring the trapped ion fluorescence signal for a number of consecutive loads. Additionally, laser ablation is used to load traps with a trap depth (40 meV) below where electron impact ionization loading is typically successful ($\\gtrsim$ 500 meV).

David R. Leibrandt; Robert J. Clark; Jaroslaw Labaziewicz; Paul Antohi; Waseem Bakr; Kenneth R. Brown; Isaac L. Chuang

2007-06-22T23:59:59.000Z

498

Numerical simulation of non-Gaussian wind load  

Science Journals Connector (OSTI)

Compared with Gaussian wind loads, there is a higher probability of strong suction fluctuations occurrence for non-Gaussian wind pressures. These instantaneous and intermittent fluctuations are the initial cau...

JiHong Ye; JingHu Ding; ChuanYan Liu

2012-11-01T23:59:59.000Z

499

Hanford Apatite Treatability Test Report Errata: Apatite Mass Loading Calculation  

SciTech Connect

The objective of this errata report is to document an error in the apatite loading (i.e., treatment capacity) estimate reported in previous apatite treatability test reports and provide additional calculation details for estimating apatite loading and barrier longevity. The apatite treatability test final report (PNNL-19572; Vermeul et al. 2010) documents the results of the first field-scale evaluation of the injectable apatite PRB technology. The apatite loading value in units of milligram-apatite per gram-sediment is incorrect in this and some other previous reports. The apatite loading in units of milligram phosphate per gram-sediment, however, is correct, and this is the unit used for comparison to field core sample measurements.

Szecsody, James E.; Vermeul, Vincent R.; Williams, Mark D.; Truex, Michael J.

2014-05-19T23:59:59.000Z

500

Adaptive load control of microgrids with non-dispatchable generation  

E-Print Network (OSTI)

Intelligent appliances have a great potential to provide energy storage and load shedding for power grids. Microgrids are simulated with high levels of wind energy penetration. Frequency-adaptive intelligent appliances are ...

Brokish, Kevin Martin

2009-01-01T23:59:59.000Z