Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation  

Science Conference Proceedings (OSTI)

The 69 KV Substation Project is based on the recognized need to provide a continuous, reliable source of power and to improve the firm capacity of the electrical service to all production facilities at Mound. The project consists of the following major element: 69 KV Substation: (1) Install a 69 KV Substation and associated equipment with two parallel 18 MVA transformers. (2) Install duct bank as required and provide 15 KV feeder cable from new substation to existing Substation 95 for connection to Mound`s existing primary distribution system. (3) Install duct bank for underground routing of the 15 KV feeder cable from Manhole 5C to the existing power house cable pit. (4) Reconfigure existing Dayton Power and Light Co. 15 KV switchgear in P Building. The purpose of this Quality Assurance Plan (QA Plan) is to assure that the objectives of the United States Department of Energy (D.O.E.) and EG&G Mound Applied Technologies, Miamisburg, Ohio (Mound) are met for this non-weapons project relative to health and safety, protection of the environment, reliability and continuity of operations, and documentation of quality efforts. This QA Plan identifies the activities and responsibilities which are necessary in the design, procurement, fabrication, installation, and start up of this project in order to meet these objectives.

Ohler, C.K.

1991-05-21T23:59:59.000Z

2

Volume II solicitation package for solicitation no. 522887-5422 {open_quotes}site electrical replacements & substation{close_quotes} subproject: 69 KV substation  

Science Conference Proceedings (OSTI)

This solicitation is for the U.S. Department of Energy under Prime Contract No. DE-AC04-88-DP43495 with EG&G Mound Applied Technologies. Ohio Sales or Use taxes are not to be included in the proposal price. Applicable taxes due or owing to the State of Ohio will be paid by the buyer under Direct Payment Permit No. 98-002230. Refer to Form ML-2487, General Provisions, Article 24, {open_quotes}Federal, State & Local Taxes{close_quotes}. Sellers are advised that purchases of building and construction materials for incorporation into a structure or improvement to a real property which is accepted for ownership by the United States or one of its agencies are exempt from Ohio Sales and Use taxes. Unnecessarily elaborate brochures or other presentations beyond those sufficient to present a complete and effective response to this solicitation are not desired and may be construed as an indication of the seller`s lack of cost consciousness. Elaborate art work, expensive paper and binding, and expensive visual and other presentation aids are neither necessary nor wanted.

NONE

1991-05-03T23:59:59.000Z

3

Retrofit of an existing 160 MVA 69KV major Chicago downtown substation to 200 MVA 138KV while maintaining continuity of service  

SciTech Connect

In 1957 Transmission Substation 68, LaSalle, (TSS 68) was placed in service. This paper reports that the station consists of four 40 MVA 69 kV/12 kV transformers which feed two 12 kV ring buses. The 12 kV switchgear is housed on the first and second floors of a 62 year old structurally sound building. Located on the south and west sides of this building are the four transformers. The entire station is located on a parcel of land approximately 14,000 square feet.

Czernenko, G.P. (Commonwealth Edison Co., Chicago, IL (United States))

1992-01-01T23:59:59.000Z

4

Generation Flexibility and Variable Generation Integration  

NLE Websites -- All DOE Office Websites (Extended Search)

pools WECC Dues, Boulder Canyon line lease 10 Davis 0506 69kv and 230kv Substation Upgrade Example 69kv upgrade to Breaker and a half and 230kv Double Breaker...

5

CX-001264: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

264: Categorical Exclusion Determination 264: Categorical Exclusion Determination CX-001264: Categorical Exclusion Determination Energy Efficiency Retrofits CX(s) Applied: B2.5, B5.1 Date: 12/17/2009 Location(s): Aroostock, Maine Office(s): Energy Efficiency and Renewable Energy Energy Efficiency and Conservation Block Grant for: Energy efficiency retrofits for several Aroostook County buildings/facilities, including heating, ventilation, air conditioner upgrades, boiler replacement, heating pipe insulating, lighting replacements, main entry doors replacements, restroom motion sensor lighting upgrades, window replacements and burner replacements. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-001264.pdf More Documents & Publications CX-001255: Categorical Exclusion Determination CX-001276: Categorical Exclusion Determination

6

Talquin Electric Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

Talquin Electric Coop, Inc Talquin Electric Coop, Inc Place Quincy, Florida Utility Id 18449 Utility Location Yes Ownership C NERC Location FRCC Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] SGIC[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial General Service Non-Demand Three Phase Service Commercial General Service Demand Industrial General Service Large Demand 12KV upto 69KV Industrial General Service Large Demand 69KV or above Industrial General Service Non-Demand Single Phase Service Commercial Outdoor Lighting Larger than Standard Area Light Lighting Outdoor Lighting Standard Area/Street Light Lighting

7

U.S. Department of Energy Categorical Exclusion Determination Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Glen Canyon Substation Stage 09- Glen Canyon Substation Stage 09- 50MVA 230/69KV Transformer addition Program or Field Office: DOE/Western/Desert Southwest Region Location(s) (City/County/State): Glen Canyon Substation, Page/Coconino County/Arizona Proposed Action Description: Submit by E-mail Western proposes to conduct electrical maintenance activities within the existing Glen Canyon Substation located at Page, Coconino County, Arizona. The project is on federal (Western-owned) property in Section 19 Township 41 N, Range 8 East, in every quarter sections 24 and 25, Coconino County, AZ, (Gila and Salt River Baseline and Meridian; Figure 1 ). The proposed scope of work includes the following (Figure 2): ·Install one 50MVA 230/69KV transformer to a new storage pad in the upper yard. The new pad will measure 26 feet 6 inches long by 16 feet

8

JOM Table of Contents: May 1995  

Science Conference Proceedings (OSTI)

FEATURE. Professional Affairs: AAES Reports the Engineering Salary Trends of 1994 [pp. 12-13] Tammy M. Beazley. DEPARTMENTS. In the Final Analysis [p.

9

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2009 7, 2009 CX-001264: Categorical Exclusion Determination Energy Efficiency Retrofits CX(s) Applied: B2.5, B5.1 Date: 12/17/2009 Location(s): Aroostock, Maine Office(s): Energy Efficiency and Renewable Energy December 17, 2009 CX-001263: Categorical Exclusion Determination Hire a Consultant CX(s) Applied: A9, A11, B2.5, B5.1 Date: 12/17/2009 Location(s): Livingston, Louisiana Office(s): Energy Efficiency and Renewable Energy December 17, 2009 CX-001255: Categorical Exclusion Determination Energy Efficiency (EE) and Conservation, Loan Program, EE Upgrades, and Update Traffic Lights CX(s) Applied: A1, A8, A11, B2.5, B5.1 Date: 12/17/2009 Location(s): Bridgeport, Connecticut Office(s): Energy Efficiency and Renewable Energy December 17, 2009 CX-001253: Categorical Exclusion Determination

10

Dynamic interfaces  

E-Print Network (OSTI)

Vasconcelos,V.T. Gay,S.J. Ravara,A. Gesbert,N. Caldeira,A.Z. FOOL'09, international workshop on foundations of object-oriented languages pp 12

Vasconcelos, V.T.; Gay, S.J.

11

EIS-0183-SA-04: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Supplement Analysis 4: Supplement Analysis EIS-0183-SA-04: Supplement Analysis Klondike Wind Project - Power Purchase Agreement, Contract Number 02PB-11093 Near Wasco, Sherman County, Oregon BPA proposes to purchase 24 megawatts (MW) of wind power from the Klondike Wind Project. The existing 24-MW Klondike Wind Project, owned and operated by Northwestern Windpower, LLC is located approximately 7 miles east of the City of Wasco in Sherman County, Oregon. The project already interconnects with the Federal Columbia River Transmission System on BPA's DeMoss-Maupin 69-kv transmission line. Within two years of the execution of the contract, the Point of Delivery may be shifted within the existing developed substation facilities. DOE/EIS-0183, Bonneville Power Administration, Supplement Analysis for the

12

Parker Planet_EA_Cover_final  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

inal inal E N V I R O N M E N TA L A S S E S S M E N T FOR PARKER - PLANET TAP 69-KV TRANSMISSION LINE REBUILD, UPGRADE AND RIGHT-OF-WAY ACTION Prepared For: US Department of Energy 615 South 43rd Avenue Phoenix, AZ 85009 Western Area Power Administration Wester n No: DOE/EA-1685 DOI-BLM-AZ-C030-2009-0051-EA COOPERATING AGENCIES: US Bureau of Land Management US F ish and Wildlife Ser vice FINAL ENVIRONMENTAL ASSESSMENT DOE/EA-1685 DOI-BLM-AZ-C030-2009-0051-EA Parker-Planet Tap 69-kV Transmission Line Rebuild, Upgrade, and Right-of-Way Action San Bernardino County, California and Mohave and La Paz Counties, Arizona

13

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 26250 of 26,764 results. 41 - 26250 of 26,764 results. Download CX-010683: Categorical Exclusion Determination Glen Canyon Substation Stage 09- 50MVA 230/69KV Transformer addition CX(s) Applied: B4.11 Date: 07/02/2013 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region http://energy.gov/nepa/downloads/cx-010683-categorical-exclusion-determination Download URTAC Meeting- October 2013 Federal Register Notice for October 10, 2013 URTAC Meeting http://energy.gov/fe/downloads/urtac-meeting-october-2013 Download UDAC Meeting- October 2013 Federal Register Notice for October 8, 2013 UDAC Meeting http://energy.gov/fe/downloads/udac-meeting-october-2013 Download Technical Position NSEP-TP-2007 Technical Position on the Requirement in DOE 0 420.1B to Use National

14

Microsoft PowerPoint - anderson_epri.ppt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review Review ETO STATCOM Demonstration Project Update September 30, 2008 Wayne Litzenberger-DesignTech Loren Anderson-BPA Participants * DOE Energy Storage Program * Sandia National Lab * NCSU * EPRI * TVA * BPA * Florida State University-Center for Advanced Power Systems * Tri-State * AES-SeaWest * Commercial Vendor ? CONDON WIND FARM Proposed Host Site Full Scale Demonstration Project * 10 MVA STATCOM with battery storage * Adjacent to Condon Wind Park * Mitsubishi Type 1 induction machines * Poor voltage regulation * Long line with many small customers Proposed 10 MVA ETO STATCOM for Condon Wind Farm 0.6886mH I=1400 A (RMS) with IEEE 519 standards ETO Voltage Source Converter (transformer leakage inductance) I=1400 A (RMS) with IEEE 519 standards 69kv bus Condon Windfarm Problems

15

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 4820 of 29,416 results. 11 - 4820 of 29,416 results. Download CX-000207: Categorical Exclusion Determination NaSi (Sodium Silicide) and Na-SG (Sodium Silica Gell) Powder Hydrogen Fuel Cells CX(s) Applied: B3.6 Date: 11/23/2009 Location(s): New York Office(s): Energy Efficiency and Renewable Energy, Golden Field Office http://energy.gov/nepa/downloads/cx-000207-categorical-exclusion-determination Download CX-001522: Categorical Exclusion Determination Activity 8 CX(s) Applied: B5.1 Date: 04/01/2010 Location(s): Sacramento County, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office http://energy.gov/nepa/downloads/cx-001522-categorical-exclusion-determination Download CX-010683: Categorical Exclusion Determination Glen Canyon Substation Stage 09- 50MVA 230/69KV Transformer addition

16

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91 - 300 of 28,905 results. 91 - 300 of 28,905 results. Download Financial Management Handbook The purpose of the Financial Management Handbook (Handbook) is to present the Department of Energy's (DOE's) standards, procedures, and operational requirements in support of the accounting policies, principles, and applicable legal requirements contained in DOE Order 534.1B. http://energy.gov/cfo/downloads/financial-management-handbook Download CX-010683: Categorical Exclusion Determination Glen Canyon Substation Stage 09- 50MVA 230/69KV Transformer addition CX(s) Applied: B4.11 Date: 07/02/2013 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region http://energy.gov/nepa/downloads/cx-010683-categorical-exclusion-determination Photo Gallery White House Leadership Summit on Women, Climate and Energy

17

Spectrum analysis of the power line flicker induced by the electrical test of the prototype Booster dipole  

Science Conference Proceedings (OSTI)

Testing of the prototype Booster dipole magnet at full current produced measurable disturbances of the beam position at the National Synchrotron Light Source. Power for the magnet and the NSLS are distributed from three substation transformers at Temple Place. Normally the substation configuration is for two independent 13.8 KV buses, derived from the 69 KV LILCO distribution. The buses are connected through a circuit breaker that is normally open circuited. Power for the magnet test is derived from one of the 13.8 KV buses and power for the NSLS is derived from the second bus. Coupling of the pulsating magnet load and the NSLS is at the 69 KV level. However, on the days that the interference was first observed at the NSLS only one-half of the substation transformers at Temple Place were in service. The 13.8 KV tie breaker was closed and the full substation load was supplied from this common bus. Thus the coupling between the pulsating magnet load and the NSLS was at the 13.8 KV level. Establishing the normal two bus configurations at Temple Place appeared to reduce the disturbance. These events suggested a controlled experiment to measure the magnet power swing and the induced powerline flicker; and from these measurements project the flicker on the lab site generated by the Booster operating at full energy. This experiment could corroborate the validity of the electrical models used in analyzing the power flow from the LILCO power grid and its distribution on the Lab site described in Accelerator Division Technical Note 220.

Meth, M.

1992-07-17T23:59:59.000Z

18

FARADAY PAPER 8 Robert S. White  

E-Print Network (OSTI)

FARADAY PAPER 8 . Robert S. White ""Hutton 1788 "" 13 "" 2 ---- Hutton', Nature (2004) 429, 623-628 () .Robert White the Faraday Institute for Science and Religion St Edmund to AD2002, Geological Society of London (2001), Special Publication No. 190, 288pp #12;3 Shakespeare

Cambridge, University of

19

FARADAY PAPER 8 Robert S. White  

E-Print Network (OSTI)

FARADAY PAPER 8 . Robert S. White Hutton 1788 13 2 ---- Hutton', Nature (2004) 429, 623-628 () .Robert White the Faraday Institute for Science and Religion St Edmund to AD2002, Geological Society of London (2001), Special Publication No. 190, 288pp #12;3 Shakespeare

Cambridge, University of

20

A Once and Future Gulf of Mexico  

E-Print Network (OSTI)

A Once and Future Gulf of Mexico Ecosystem Restoration Recommendations of an Expert Working Group. Washington, DC. 112 pp. #12;A Once and Future Gulf of Mexico Ecosystem Restoration Recommendations Introduction 9 Precedents and Principles for Restoring the Gulf of Mexico Ecosystem 15 Acute and Chronic

Florida, University of

Note: This page contains sample records for the topic "69-kv pp-12 aroostock" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Hopi Sustainable Energy Plan  

SciTech Connect

The Hopi Tribal Government as part of an initiative to ?Regulate the delivery of energy and energy services to the Hopi Reservation and to create a strategic business plan for tribal provision of appropriate utility, both in a manner that improves the reliability and cost efficiency of such services,? established the Hopi Clean Air Partnership Project (HCAPP) to support the Tribe?s economic development goals, which is sensitive to the needs and ways of the Hopi people. The Department of Energy (DOE) funded, Formation of Hopi Sustainable Energy Program results are included in the Clean Air Partnership Report. One of the Hopi Tribe?s primary strategies to improving the reliability and cost efficiency of energy services on the Reservation and to creating alternative (to coal) economic development opportunities is to form and begin implementation of the Hopi Sustainable Energy Program. The Hopi Tribe through the implementation of this grant identified various economic opportunities available from renewable energy resources. However, in order to take advantage of those opportunities, capacity building of tribal staff is essential in order for the Tribe to develop and manage its renewable energy resources. As Arizona public utilities such as APS?s renewable energy portfolio increases the demand for renewable power will increase. The Hopi Tribe would be in a good position to provide a percentage of the power through wind energy. It is equally important that the Hopi Tribe begin a dialogue with APS and NTUA to purchase the 69Kv transmission on Hopi and begin looking into financing options to purchase the line.

Norman Honie, Jr.; Margie Schaff; Mark Hannifan

2004-08-01T23:59:59.000Z

22

Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 8822  

NLE Websites -- All DOE Office Websites (Extended Search)

e e rgy Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 8822 1 OCT 1 8 2012 Mr. John E. Kieling. Chief Hazardous Waste Bureau New Mexico Envi ronment Department 2905 Rodeo Park Drive Easl. Building 1 Sanla Fe. New Mexico 87505-6303 Subject: Tran smittal of Waste Isolation Pilot Plant An nual Reports Dear Mr. Kieling . The purpose of this letter is to provide you with the following annual reports as required by Ihe Wasle Isola li on Pilol Planl Hazardous Was le Facilily Permil No. NM4890139086- TSDF . Part 4. Seclion 4.6.1.2. * W aste Isolalion Pilot Planl Geolechnica l Analysis Report for July 2010 - June 2011 . DOEIWI PP-12-3464 . Volumes 1 and 2 * Assessment of the Short-Term Stability of the 12 Foot Explosion Isolation Wa lls in Panel 1 and 2. November 20

23

Presidential Permits | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Presidential Permits Presidential Permits Presidential Permits Below is a listing of all the presidential permits grouped by Canada and Mexico. View the Presidental Permits - Mexico View the Presidential Permits - Canada PRESIDENTIAL PERMITS - CANADA BACK TO TOP Docket No. Company Date Issued PP-6 Puget Sound Energy 04/28/81 PP-10 BPA 10/27/45 PP-10-1 BPA 11/30/65 PP-11-2 Fraser Papers 02/29/99 PP-11 Fraser Papers (Rescinded in PP-366) 11/18/10 PP-12 Maine 12/05/63 PP-13 NiMo Hogansburg 01/31/48 PP-18 Glacier Electric 12/12/52 PP-20 Eastern Maine 05/25/65 PP-22 BC Hydro 08/24/67 PP-22-1 BC Hydro 07/21/55 PP-22-2 BC Hydro 02/04/58 PP-22-3 BC Hydro 08/24/67 PP-22-4 BCTC 09/05/07 PP-23 Netley 07/20/55 PP-24 Long Sault 06/06/80 PP-25 NYPA 06/06/80 PP-28 Northern Electric 04/17/63