National Library of Energy BETA

Sample records for 60w incandescent replacement

  1. CALiPER Benchmark Report: Performance of Incandescent A Type and Decorative Lamps and LED Replacements

    SciTech Connect (OSTI)

    None

    2008-11-01

    This benchmark report addresses common omnidirectional incandescent lamps - A-type and small decorative, candelabra-type lamps - and their commercially available light-emitting diode (LED) replacements.

  2. Stress Testing of the Philips 60W Replacement Lamp L Prize Entry

    SciTech Connect (OSTI)

    Poplawski, Michael E.; Ledbetter, Marc R.; Smith, Mark

    2012-04-24

    The Pacific Northwest National Laboratory, operated by Battelle for the U.S. Department of Energy, worked with Intertek to develop a procedure for stress testing medium screw-base light sources. This procedure, composed of alternating stress cycles and performance evaluation, was used to qualitatively compare and contrast the durability and reliability of the Philips 60W replacement lamp L Prize entry with market-proven compact fluorescent lamps (CFLs) with comparable light output and functionality. The stress cycles applied simultaneous combinations of electrical, thermal, vibration, and humidity stresses of increasing magnitude. Performance evaluations measured relative illuminance, x chromaticity and y chromaticity shifts after each stress cycle. The Philips L Prize entry lamps appear to be appreciably more durable than the incumbent energy-efficient technology, as represented by the evaluated CFLs, and with respect to the applied stresses. Through the course of testing, all 15 CFL samples permanently ceased to function as a result of the applied stresses, while only 1 Philips L Prize entry lamp exhibited a failure, the nature of which was minor, non-destructive, and a consequence of a known (and resolved) subcontractor issue. Given that current CFL technology appears to be moderately mature and no Philips L Prize entry failures could be produced within the stress envelope causing 100 percent failure of the benchmark CFLs, it seems that, in this particular implementation, light-emitting diode (LED) technology would be much more durable in the field than current CFL technology. However, the Philips L Prize entry lamps used for testing were carefully designed and built for the competition, while the benchmark CFLs were mass produced for retail sale—a distinction that should be taken into consideration. Further reliability testing on final production samples would be necessary to judge the extent to which the results of this analysis apply to production versions of the Philips L Prize entry.

  3. CALiPER Benchmark Report: Performance of Halogen Incandescent MR16 Lamps and LED Replacement

    SciTech Connect (OSTI)

    None

    2008-11-01

    This benchmark report addresses the halogen MR16 lamp and its commercially available light-emitting diode (LED) replacements.

  4. High efficiency incandescent lighting

    DOE Patents [OSTI]

    Bermel, Peter; Ilic, Ognjen; Chan, Walker R.; Musabeyoglu, Ahmet; Cukierman, Aviv Ruben; Harradon, Michael Robert; Celanovic, Ivan; Soljacic, Marin

    2014-09-02

    Incandescent lighting structure. The structure includes a thermal emitter that can, but does not have to, include a first photonic crystal on its surface to tailor thermal emission coupled to, in a high-view-factor geometry, a second photonic filter selected to reflect infrared radiation back to the emitter while passing visible light. This structure is highly efficient as compared to standard incandescent light bulbs.

  5. Incandescent Lighting | Department of Energy

    Office of Environmental Management (EM)

    courtesy of iStockphotoTokenPhoto. Incandescent lamps are often considered the least energy efficient type of electric lighting commonly found in residential buildings....

  6. Replacing Incandescent Lightbulbs and Ballasts | Department of...

    Energy Savers [EERE]

    (R)or parabolic reflector (PAR) CFLs for flood and spotlighting. Some CFL fixtures have built-in electronic ballasts and polished metal reflectors. When used in recessed...

  7. How Energy-Efficient Light Bulbs Compare with Traditional Incandescent...

    Office of Environmental Management (EM)

    Energy-Efficient Light Bulbs Compare with Traditional Incandescents How Energy-Efficient Light Bulbs Compare with Traditional Incandescents November 5, 2014 - 11:39pm Addthis By...

  8. How Energy-Efficient Light Bulbs Compare with Traditional Incandescent...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    you can save 75 each year. Compared to traditional incandescents, energy-efficient lightbulbs such as halogen incandescents, compact fluorescent lamps (CFLs), and light emitting...

  9. Dual LED/incandescent security fixture

    DOE Patents [OSTI]

    Gauna, Kevin Wayne

    2005-06-21

    A dual LED and incandescent security lighting system uses a hybrid approach to LED illumination. It combines an ambient LED illuminator with a standard incandescent lamp on a motion control sensor. The LED illuminator will activate with the onset of darkness (daylight control) and typically remain on during the course of the night ("always on"). The LED illumination, typically amber, is sufficient to provide low to moderate level lighting coverage to the wall and ground area adjacent to and under the fixture. The incandescent lamp is integrated with a motion control circuit and sensor. When movement in the field of view is detected (after darkness), the incandescent lamp is switched on, providing an increased level of illumination to the area. Instead of an "always on" LED illuminator, the LEDs may also be switched off when the incandescent lamp is switched on.

  10. How Energy-Efficient Light Bulbs Compare with Traditional Incandescent...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    used light fixtures or bulbs with models that have earned the ENERGY STAR, you can save 75 each year. Compared to traditional incandescents, energy-efficient lightbulbs...

  11. ECE 466: LED Lighting Systems -Incandescent lightings rise and

    E-Print Network [OSTI]

    Connors, Daniel A.

    ECE 466: LED Lighting Systems - Incandescent lightings rise and demise via government policy - Alternative Fluorescent light sources and compact fluorescent lights (CFL) to incandescents - Alternative LED light sources - Color index as well as Watts to Lumens efficiency available from all three light sources

  12. IDS120hm GEOMETRY WITH MODIFIED Hg POOL VESSEL SIMULATIONS FOR 60% W + 40% He SHIELDING WITHOUT/WITH

    E-Print Network [OSTI]

    McDonald, Kirk

    IDS120hm GEOMETRY WITH MODIFIED Hg POOL VESSEL SIMULATIONS FOR 60% W + 40% He SHIELDING WITHOUT: (m IS FOR) modified Hg pool vessel IN IDS120h. # WITHOUT AND WITH Hg IN THE POOL SIMULATIONS Hg POOL VESSEL AND SHIFTED Be WIDOW FROM 600 cm (0.6 cm THICK) TO 300 cm (1 cm THICK). MODIFIED Hg

  13. IDS120h GEOMETRY WITH MODIFIED Hg POOL VESSEL SIMULATIONS FOR 60% W + 40% He SHIELDING (P12 'POINT') WITH

    E-Print Network [OSTI]

    McDonald, Kirk

    IDS120h GEOMETRY WITH MODIFIED Hg POOL VESSEL SIMULATIONS FOR 60% W + 40% He SHIELDING (P12 'POINT POWER DISTRIBUTION. Nicholas Souchlas, PBL (1/24/2012) 1 #12;IDS120hm: (m IS FOR) modified Hg pool 'POINT'). >GAUSSIAN PROFILE: x = y = 0.12 cm. 2 #12;3 IDS120hm GEOMETRY = IDS120h WITH MODIFIED Hg POOL

  14. IDS120h GEOMETRY WITH SHIELDING VESSELS SHIELDING MATERIAL: 60% W + 40% He vs. 60% WC + 40% H2O

    E-Print Network [OSTI]

    McDonald, Kirk

    IDS120h GEOMETRY WITH SHIELDING VESSELS SHIELDING MATERIAL: 60% W + 40% He vs. 60% WC + 40% H2O FOR VESSELS Nicholas Souchlas, PBL (11/15/2011) 1 #12;IDS120h with shielding vessels. # Different cases and BP2 with Be sections (N=100,000). # N = 100,000 simulation with supporting ribs for vessels. >mars

  15. Energy Savings and NOx Emissions Reduction Potential from the 2012 Federal Legislation to Phase Out Incandescent Lamps in Texas 

    E-Print Network [OSTI]

    Liu, Zi; Baltazar, Juan Carlos; Haberl, Jeff; Soman, Rohit

    2010-01-01

    Lamps in Texas Description Value Reference Total Housing Units in Texas in 2013: 10,204,056 Real Estate Center, Texas A&M University3, U.S. Census Bureau4 5 Average Lighting Electricity Usage per House: 1,946 kWh/yr NREL Building America Program6... % of Lamps That can be Retrofitted with a CFL: 70% NREL Building America Program6 and ESL Assumption % of Savings From Replacing Incandescent to CFL Lamps: 75% ESL Assumption CFL Lighting Electricity Savings per House: 1,022 kWh/yr Total Annual CFL...

  16. IDS120h GEOMETRY WITH MODIFIED Hg POOL VESSEL SIMULATIONS FOR 60% W + 40% He SHIELDING (P12 'POINT')

    E-Print Network [OSTI]

    McDonald, Kirk

    IDS120h GEOMETRY WITH MODIFIED Hg POOL VESSEL SIMULATIONS FOR 60% W + 40% He SHIELDING (P12 'POINT (12/27/2011) 1 #12;IDS120hm: (m IS FOR) modified Hg pool vessel IN IDS120h. # 5E5 SIMULATIONS AND SHIFTED Be WIDOW FROM 600 cm (0.6 cm THICK) TO 300 cm (1 cm THICK). MODIFIED Hg POOL EXTENTS FROM 86 cm

  17. L Prize Drives Technology Innovation, Energy Savings

    SciTech Connect (OSTI)

    2014-04-30

    Fact sheet that provides an overview of DOE's L Prize competition, which challenges industry to develop high-quality, high-efficiency SSL products to replace 60W incandescent and PAR38 halogen light bulbs, and highlights the competition's first 60W winner from Philips Lighting North America.

  18. Potential Environmental Impacts from the Metals in Incandescent, Compact Fluorescent Lamp (CFL), and Light-Emitting Diode (LED)

    E-Print Network [OSTI]

    Short, Daniel

    Potential Environmental Impacts from the Metals in Incandescent, Compact Fluorescent Lamp (CFL, previous studies have investigated various environmental impacts from incandescent, CFL, and LED bulbs. There is uncertainty about the potential environmental impacts of these components and whether special provisions must

  19. IDS120h GEOMETRY WITH MODIFIED Hg POOL VESSEL SIMULATIONS FOR 60% W + 40% He SHIELDING (P11/P12 'POINTS') (CONT.)

    E-Print Network [OSTI]

    McDonald, Kirk

    IDS120h GEOMETRY WITH MODIFIED Hg POOL VESSEL SIMULATIONS FOR 60% W + 40% He SHIELDING (P11/P12hm: (m IS FOR) modified Hg pool vessel IN IDS120h. # 1E5 AND 5E5 SIMULATIONS COMPARISON = y = 0.12 cm. 2 #12;3 IDS120hm GEOMETRY = IDS120h WITH MODIFIED Hg POOL VESSEL AND SHIFTED Be WIDOW

  20. Employee Replacement Costs

    E-Print Network [OSTI]

    Dube, Arindrajit; Freeman, Eric; Reich, Michael

    2010-01-01

    Samuel Schenker, “The Costs of Hir- u ing Skilled Workers”,Employee Replacement Costs Arindrajit Dube, Eric Freeman andof employee replacement costs, using a panel survey of

  1. Energy Replacement Generation Tax Exemption

    Broader source: Energy.gov [DOE]

    Under the Energy Replacement Generation Tax Exemption, the following facilities are exempt from the replacement tax:

  2. Radiation Source Replacement Workshop

    SciTech Connect (OSTI)

    Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

    2010-12-01

    This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

  3. 2014-04-11 Issuance: Energy Conservation Standards for General Service Fluorescent Lamps and Incandescent Reflector Lamps; Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding energy conservation standards for general service fluorescent lamps and incandescent reflectors lamps, as issued by the Assistant Secretary for Energy Efficiency and Renewable Energy on April 11, 2014.

  4. PROJECTS IMPLEMENTED The City focused on improving the efficiency of

    E-Print Network [OSTI]

    · Replacing incandescent exit signs with new light emitting diode signs · Replacing the existing chiller

  5. Replacing Lightbulbs and Ballasts | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lighting Replacing Lightbulbs and Ballasts Replacing Lightbulbs and Ballasts Replace frequently used bulbs with more energy efficient options to save money and energy. Replace...

  6. E ~E 60 W E E E

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submit theCovalentLaboratory |Sectorfor $1.14Dynein Motor DomainDynein| E2 0>

  7. Effects of aggregate morphology and size on laser-induced incandescence and scattering from black carbon (mature soot)

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Bambha, Ray P.; Michelsen, Hope A.

    2015-07-03

    We have used a Single-Particle Soot Photometer (SP2) to measure time-resolved laser-induced incandescence (LII) and laser scatter from combustion-generated mature soot with a fractal dimension of 1.88 extracted from a burner. We have also made measurements on restructured mature-soot particles with a fractal dimension of 2.3–2.4. We reproduced the LII and laser-scatter temporal profiles with an energy- and mass-balance model, which accounted for heating of particles passed through a CW-laser beam over laser–particle interaction times of ~10 ?s. Furthermore, the results demonstrate a strong influence of aggregate size and morphology on LII and scattering signals. Conductive cooling competes with absorptivemore »heating on these time scales; the effects are reduced with increasing aggregate size and fractal dimension. These effects can lead to a significant delay in the onset of the LII signal and may explain an apparent low bias in the SP2 measurements for small particle sizes, particularly for fresh, mature soot. The results also reveal significant perturbations to the measured scattering signal from LII interference and suggest rapid expansion of the aggregates during sublimation.« less

  8. Soot particle sizing during high-pressure Diesel spray combustion via time-resolved laser-induced incandescence

    SciTech Connect (OSTI)

    Ryser, R.; Gerber, T.; Dreier, T. [Reaction Analysis Group, Department of General Energy, Paul Scherrer Institute, CH-5232 Villigen (Switzerland)

    2009-01-15

    Single-pulse time-resolved laser-induced incandescence (TiRe-LII) signal transients from soot particulates were acquired during unsteady high pressure Diesel combustion in a constant volume cell for typical top dead center conditions during a Diesel engine cycle. Measurements were performed for initial gas pressures between 1 and 3 MPa, injection pressures between 50 and 130 MPa and laser probe timings between 5 and 16 ms after start of fuel injection. In separate experiments and for the same cell operating conditions gas temperatures were deduced from spectrally resolved soot pyrometry measurements. Implementing the LII model of Kock et al. [Combust. Flame 147 (20006) 79-92] ensemble mean soot particle diameters were evaluated from least-squares fitting of theoretical cooling curves to experimental TiRe-LII signal transients. Since in the experiments the environmental gas temperature and the width of an assumed particle size distribution were not known, the effects of the initial choice of these parameters on retrieved particle diameters were investigated. It is shown that evaluated mean particle diameters are only slightly biased by the choice of typical size distribution widths and gas temperatures. For a fixed combustion phase mean particle diameters are not much affected by gas pressure, however they become smaller at high fuel injection pressure. At a mean chamber pressure of 1.39 MPa evaluated mean particle diameters increased by a factor of two for probe delays between 5 and 16 ms after start of injection irrespective of the choices of first-guess fitting variables, indicating a certain robustness of data analysis procedure. (author)

  9. Soot particle sizing during high-pressure Diesel spray combustion via time-resolved laser-induced incandescence

    SciTech Connect (OSTI)

    Ryser, R.; Gerber, T.; Dreier, T. [Reaction Analysis Group, Department of General Energy, Paul Scherrer Institute, CH-5232 Villigen PSI (Switzerland)

    2008-11-15

    Single-pulse time-resolved laser-induced incandescence (TiRe-LII) signal transients from soot particulates were acquired during unsteady high pressure Diesel combustion in a constant volume cell for typical top dead center conditions during a Diesel engine cycle. Measurements were performed for initial gas pressures between 1 and 3 MPa, injection pressures between 50 and 130 MPa and laser probe timings between 5 and 16 ms after start of fuel injection. In separate experiments and for the same cell operating conditions gas temperatures were deduced from spectrally resolved soot pyrometry measurements. Implementing the LII model of Kock et al. [Combust. Flame 147 (2006) 79-92] ensemble mean soot particle diameters were evaluated from least-squares fitting of theoretical cooling curves to experimental TiRe-LII signal transients. Since in the experiments the environmental gas temperature and the width of an assumed particle size distribution were not known, the effects of the initial choice of these parameters on retrieved particle diameters were investigated. It is shown that evaluated mean particle diameters are only slightly biased by the choice of typical size distribution widths and gas temperatures. For a fixed combustion phase mean particle diameters are not much affected by gas pressure, however they become smaller at high fuel injection pressure. At a mean chamber pressure of 1.39 MPa evaluated mean particle diameters increased by a factor of two for probe delays between 5 and 16 ms after start of injection irrespective of the choices of first-guess fitting variables, indicating a certain robustness of data analysis procedure. (author)

  10. Helicopter aids transmission pole replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Helicopter-aids-transmission-pole-replacement Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects...

  11. Window Replacement, Rehabilitation, & Repair Guides - Building...

    Energy Savers [EERE]

    Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Effec...

  12. Initial Score: # of workers

    E-Print Network [OSTI]

    Yamamoto, Keith

    My lab has replaced incandescent lamps with Compact Fluorescent Lamps (CFLs) or Light Emitting Diodes

  13. Virent is Replacing Crude Oil

    Office of Energy Efficiency and Renewable Energy (EERE)

    Breakout Session 2A—Conversion Technologies II: Bio-Oils, Sugar Intermediates, Precursors, Distributed Models, and Refinery Co-Processing Virent is Replacing Crude Oil Randy Cortright, Founder & Chief Technology Officer, Virent

  14. EnergySmart Schools Tips: Retrofitting, Operating, and Maintaining...

    Energy Savers [EERE]

    less than three years. * Replace conventional incandescent exit signs with LED (light-emitting diode) exit signs. LEDs use at least 75 percent less energy than incandescent bulbs....

  15. Replacing Fluorescent Lightbulbs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fluorescent Lightbulbs Replacing Fluorescent Lightbulbs July 29, 2012 - 6:37pm Addthis Although fluorescent lightbulbs are generally energy efficient, you can replace them with...

  16. Will peanut hulls replace oil

    SciTech Connect (OSTI)

    Not Available

    1980-12-01

    A low-cost, fast-curing wood adhesive has been recently developed by the University of Georgia, in which up to 80% of the petroleum ingredients can be replaced with a substance extracted from peanut hulls. An outline of the process is given.

  17. LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR®

    Broader source: Energy.gov [DOE]

    This May 19, 2009 webcast summarized CALiPER's recent benchmark testing of common omnidirectional incandescent lamps (e.g., A-lamps), and provided an update on ENERGY STAR criteria for LED integral...

  18. Modifications to Replacement Costs System

    SciTech Connect (OSTI)

    Godec, M. [ICF Resources, Inc., Fairfax, VA (United States)

    1989-05-18

    The purpose of this memorandum is to document the improvements and modifications made to the Replacement Costs of Crude Oil (REPCO) Supply Analysis System. While some of this work was performed under our previous support contract to DOE/ASFE, we are presenting all modifications and improvements are presented here for completeness. The memo primarily documents revisions made to the Lower-48 Onshore Model. Revisions and modifications made to other components and models in the REPCO system which are documented elsewhere are only highlighted in this memo. Generally, the modifications made to the Lower-48 Onshore Model reflect changes that have occurred in domestic drilling, oil field costs, and reserves since 1982, the date of the most recent available data used for the original Replacement Costs report, published in 1985.

  19. Evaluation of the irising effect of a slow-gating intensified charge-coupled device on laser-induced incandescence measurements of soot

    SciTech Connect (OSTI)

    Shaddix, Christopher R.; Williams, Timothy C. [Combustion Research Facility, Sandia National Laboratories, 7011 East Avenue, Livermore, California 94550 (United States)

    2009-03-15

    Intensified charge-coupled devices (ICCDs) are used extensively in many scientific and engineering environments to image weak or temporally short optical events. To optimize the quantum efficiency of light collection, many of these devices are chosen to have characteristic intensifier gate times that are relatively slow, on the order of tens of nanoseconds. For many measurements associated with nanosecond laser sources, such as scattering-based diagnostics and most laser-induced fluorescence applications, the signals rise and decay sufficiently fast during and after the laser pulse that the intensifier gate may be set to close after the cessation of the signal and still effectively reject interferences associated with longer time scales. However, the relatively long time scale and complex temporal response of laser-induced incandescence (LII) of nanometer-sized particles (such as soot) offer a difficult challenge to the use of slow-gating ICCDs for quantitative measurements. In this paper, ultraviolet Rayleigh scattering imaging is used to quantify the irising effect of a slow-gating scientific ICCD camera, and an analysis is conducted of LII image data collected with this camera as a function of intensifier gate width. The results demonstrate that relatively prompt LII detection, generally desirable to minimize the influences of particle size and local gas pressure and temperature on measurements of the soot volume fraction, is strongly influenced by the irising effect of slow-gating ICCDs.

  20. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Reliability Projects Expand Projects Skip navigation links Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement...

  1. łNi˛ Clusterbank Replacement Project | Argonne Leadership Computing...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ni Clusterbank Replacement Project Event Sponsor: Argonne Leadership Computing Facility Seminar Start Date: Oct 20 2015 - 12:00pm BuildingRoom: Building 241Room D173...

  2. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Powerhouse 1 Main Unit Breakers and Station Service Replacement This proposed investment addresses issues with two groups of equipment in Powerhouse 1 at Bonneville: * Main unit...

  3. LED Replacements for Linear Fluorescent Lamps Webcast

    Broader source: Energy.gov [DOE]

    In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting...

  4. USING NEURAL NETWORKS FOR WEB PROXY CACHE REPLACEMENT

    E-Print Network [OSTI]

    ElAarag, Hala

    USING NEURAL NETWORKS FOR WEB PROXY CACHE REPLACEMENT by JAKE COBB Advisor HALA ELAARAG A senior................................................................................................... 10 4. NEURAL NETWORK PROXY CACHE REPLACEMENT .................................. 12 5. SIMULATION replacement is developed. Unlike previous approaches, this research utilizes neural networks for replacement

  5. Replacement solvents for use in chemical synthesis

    DOE Patents [OSTI]

    Molnar, Linda K. (Philadelphia, PA); Hatton, T. Alan (Sudbury, MA); Buchwald, Stephen L. (Newton, MA)

    2001-05-15

    Replacement solvents for use in chemical synthesis include polymer-immobilized solvents having a flexible polymer backbone and a plurality of pendant groups attached onto the polymer backbone, the pendant groups comprising a flexible linking unit bound to the polymer backbone and to a terminal solvating moiety. The polymer-immobilized solvent may be dissolved in a benign medium. Replacement solvents for chemical reactions for which tetrahydrofuran or diethyl may be a solvent include substituted tetrahydrofurfuryl ethers and substituted tetrahydro-3-furan ethers. The replacement solvents may be readily recovered from the reaction train using conventional methods.

  6. Marin County- Wood Stove Replacement Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Homes in the San Geronimo Valley (Forest Knolls, Lagunitas, San Geronimo, and Woodacre) can receive a rebate of $1,500 for the removal and replacement of non-certified wood burning appliances with...

  7. Incandescent Lighting | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLforLDRD Report11,SecurityHomeRemarks As Prepared for

  8. Incandescent Lighting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuelsof Energy ServicesContractingManagementSuccess,Energy

  9. A replaceable reflective film for solar concentrators

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

  10. Sustainable LED Fluorescent Light Replacement Technology

    SciTech Connect (OSTI)

    2011-06-30

    Ilumisys and the National Center for Manufacturing Sciences (NCMS) partnered on a three-year project awarded by the United States (U.S.) Department of Energy (DOE), to quantify the impacts of LED lamps, incandescent lamps and fluorescent benchmark lamps over a product lifecycle – i.e. to develop a sustainable design and manufacturing strategy that addresses product manufacturing, use, recycling and disposal scenarios for LED-based lighting. Based on the knowledge gained from extensive product tear-down studies of fluorescent and screw-in lighting products, lifecycle assessment tools, and accelerated lifecycle testing protocols, an interactive Sustainable LED Design Guide has been developed to aid architectural and lighting designers and engineers in making design decisions that consider three important environmental impacts (greenhouse gas emissions, energy use and mercury emission) across all phases of the life of an LED lighting product. Critical information developed for the lifecycle analysis and product feature comparisons is the useful life of the lighting product as well as its performance. The Design Guide is available at www.ncms.org, and was developed based on operational and durability testing of a variety of lighting products including power consumption, light output, and useful life of a lamp in order to allow a more realistic comparison of lamp designs. This report describes the main project tasks, results and innovative features of the lifecycle assessment (LCA)-based design tools, and the key considerations driving the sustainable design of LED lighting systems. The Design Guide incorporates the following three novel features for efficiently evaluating LED lighting features in value-chains: • Bill-of-Materials (BOM) Builder – Designers may import process data for each component and supply functional data for the product, including power, consumption, lumen output and expected useful life. • Environmental Impact Review – Designs are comparable across lifecycle phases, subsystems, and environmental impact category, and can be normalized to a userdefined functional unit. • Drill-down Review – These provide an indepth look at individual lamp designs with the ability to review across subsystem or lifecycle phase.

  11. Avoiding a Train Wreck: Replacing Old Coal Plants with Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 This...

  12. Cobalt discovery replaces precious metals as industrial catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Discovery Replaces Precious Metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications...

  13. Nashville Gas treads carefully to replace pipe

    SciTech Connect (OSTI)

    1997-06-01

    The private gas utility, Nashville Gas, was responsible for replacing damaged or inadequate 2- and 4-inch steel gas lines beneath Music City, USA. The line replacements required either size for size or upsizing. The first choice was directional drilling, which was quickly determined to be unpractical because of rocky soil conditions. The second option was open trenching. Undoubtedly, trenching would mean having to contend with angry residents and tourists, since gas lines ran beneath yards, mature trees, sidewalks, roadways, and railways. In addition to the negative social factors, trenching would require additional funds for substantial landscaping and pavement replacement. It at all possible, a no-dig alternative was desired. Nashville Gas found Grundomat piercing tools which create a bore, then pushes pipe back through it. These same tools can simultaneously pull in pipe. These tools were customized for the Nashville project.

  14. Amendment 80 vessel replacement 1 Implementation and of Amendment 80 Vessel Replacement Provisions

    E-Print Network [OSTI]

    Amendment 80 vessel replacement 1 Implementation and of Amendment 80 Vessel Replacement Provisions identified and limited the vessels that could be used to fish for certain species of BSAI groundfish in a particular sector of the groundfish fishery. The final rule included this vessel restriction based on NMFS

  15. Beyond the Replacement Paradigm: Smart Lighting

    E-Print Network [OSTI]

    Salama, Khaled

    Hole? · DC device in an AC Powered World · Cool light source with thermal issues · High Efficacy ­ High Spectral Density Information Informationneeded to makethe Light SMART #12;10 Light Flow ­ InformationBeyond the Replacement Paradigm: Smart Lighting Robert F. Karlicek, Jr. Director, Smart Lighting

  16. Measure Guideline: Window Repair, Rehabilitation, and Replacement

    SciTech Connect (OSTI)

    Baker, P.

    2012-12-01

    This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

  17. Replaces EIA-459E OMB Control No.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7, 2015 ThermochemEnergyReplacement of3

  18. Retail Replacement Lamps | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale PowerNaturalEnergyResuming OperationsOperated

  19. Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs...

  20. Electrical Equipment Replacement: Energy Efficiency versus System Compatibility 

    E-Print Network [OSTI]

    Massey, G. W.

    2005-01-01

    Electrical equipment components are replaced every day because of failure, obsolescence, or upgrade. Because of technological gains, replacement components are typically more energy efficient than older equipment. Life cycle cost analyses encourage...

  1. Surgical navigation in canine total knee replacement

    E-Print Network [OSTI]

    Peters, Kaleigh M.; Hutter, Erin; Siston, Robert A.; Bertran, Judith

    2015-06-16

    of the cutting block provides a surrogate marker for final alignment of the 179 tibial component. A flat, thin-bladed tracking tool (Figure 2E) was placed on the top 180 surface of the tibial cutting block to record its orientation in the frontal and sagittal... ] Baker KM, Foutz TL, Johnson KJ, et al. Effects of tibial plateau angle and spacer 444 thickness applied during in vitro canine total knee replacement on three-dimensional 445 kinematics and collateral ligament strain. Am J Vet Res 2014; 75...

  2. Sampling with unequal probabilities and without replacement 

    E-Print Network [OSTI]

    Kleibrink, Ronald Gus

    1966-01-01

    . 6105 . 5161 . 6210 9 1. 0000 1. 0000 1. 0000 1. 0000 ~ 1796 . 5217 . 7073 . 6105 . 5161 . 5889 Specifically the normalized sizes and cumulative normalized. sizes are defined. as (3. 6) pi = n. xi/X so that N (3. 7) Z p = n 1=1 (3. 8) Pi = E p J... to have given the first general theory for sampling with unequal probabilities and without replacement. They used. as an estimate of the population total I for N units, the standard unbiased estimator A n (1 ' 1) I = Z (y / 77 ) i=3 where 77...

  3. Text-Alternative Version: LED Replacements for Linear Fluorescent Lamps

    Broader source: Energy.gov [DOE]

    Below is the text-alternative version of the "LED Replacements for Linear Fluorescent Lamps" webcast, held June 20, 2011.

  4. ChangeBehaviors Replace your old toilets and

    E-Print Network [OSTI]

    1 FixLeaks ChangeBehaviors Replace your old toilets and showerheads with water-saver models UseToilets Replace your clothes washer with an Energy StarTM washer PurchaseWater SavingWasher Reduce Water Use inLeaks ChangeBehaviors Replace your old toilets and showerheads with water-saver models Use less water, reuse

  5. Alternatives to proposed replacement production reactors

    SciTech Connect (OSTI)

    Cullingford, H.S.

    1981-06-01

    To insure adequate supplies of plutonium and tritium for defense purposes, an independent evaluation was made by Los Alamos National Laboratory of the numerous alternatives to the proposed replacement production reactors (RPR). This effort concentrated on the defense fuel cycle operation and its technical implications in identifying the principal alternatives for the 1990s. The primary options were identified as (1) existing commercial reactors, (2) existing and planned government-owned facilities (not now used for defense materials production), and (3) other RPRs (not yet proposed) such as CANDU or CANDU-type heavy-water reactors (HWR) for both plutonium and tritium production. The evaluation considered features and differences of various options that could influence choice of RPR alternatives. Barring a change in the US approach to civilian and defense fuel cycles and precluding existing commercial reactors at government-owned sites, the most significant alternatives were identified as a CANDU-type HWR at Savannah River Plant (SRP) site or the Three Mile Island commercial reactor with reprocessing capability at Barnwell Nuclear Fuel Plant and at SRP.

  6. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement...

    Broader source: Energy.gov (indexed) [DOE]

    Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA's proposed action was to fund the project. PUBLIC COMMENT...

  7. Applications of molecular replacement to G protein-coupled receptors...

    Office of Scientific and Technical Information (OSTI)

    to G protein-coupled receptors The use of molecular replacement in solving the structures of G protein-coupled receptors is discussed, with specific examples being described...

  8. Boron-10 Neutron Detectors for Helium-3 Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Email Boron-10 Neutron Detectors for Helium-3 Replacement Applications: Portal monitoring Nuclear energy safety and monitoring Nuclear non-proliferation Benefits: Drop-in...

  9. Replace Fossil Fuels, Final Technical Report Roberts, William...

    Office of Scientific and Technical Information (OSTI)

    Crude Glycerol as Cost-Effective Fuel for Combined Heat and Power to Replace Fossil Fuels, Final Technical Report Roberts, William L 09 BIOMASS FUELS biofuels, glycerin, glycerol,...

  10. Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Value of Program Evaluation Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs A program within the U.S. Environmental...

  11. Plutonium finishing plant safeguards and security systems replacement study

    SciTech Connect (OSTI)

    Klear, P.F.; Humphrys, K.L.

    1994-12-01

    This document provides the preferred alternatives for the replacement of the Safeguards and Security systems located at the Hanford Plutonium Finishing Plant.

  12. Cobalt discovery replaces precious metals as industrial catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    processes Common cobalt may replace pricier, rare metal relatives Potential applications: biofuel production, carbon dioxide reduction, basic necessary chemistry LOS ALAMOS, N.M.,...

  13. Sensing Super-position: Visual Instrument Sensor Replacement

    E-Print Network [OSTI]

    Maluf, David A.

    1 Sensing Super-position: Visual Instrument Sensor Replacement David A. Maluf 650-604-0611 David human vision through Sensing Super-position using a Visual Instrument Sensory Organ Replacement (VISOR instruments into sounds, which become relevant when the visual resolution is insufficient for very difficult

  14. Renne Generator Replacement Addendum 1 Page 1 May 28, 2015

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Renne Generator Replacement Addendum 1 Page 1 May 28, 2015 Montana State University Loras O'Toole Project: 14-0105 Renne Library Generator Replacement MECHANICAL AND ELECTRICAL ADDENDUM ITEMS Bidders of the Phasing Notes have been revised to read: a. Section A: Currently the existing indoor generator does

  15. Adhesive High-Level Replacement Categories and Systems

    E-Print Network [OSTI]

    Habel, Annegret

    Adhesive High-Level Replacement Categories and Systems Hartmut Ehrig1 , Annegret Habel2 , Julia.habel@informatik.uni-oldenburg.de Abstract. Adhesive high-level replacement (HLR) categories and sys- tems are introduced as a new of HLR systems with the new concept of adhesive categories introduced by Lack and Soboci

  16. Replace Pressure-Reducing Valves with Backpressure Turbogenerators

    SciTech Connect (OSTI)

    Not Available

    2006-01-01

    This revised ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  17. Laboratory Evaluation of LED T8 Replacement Lamp Products

    SciTech Connect (OSTI)

    Richman, Eric E.; Kinzey, Bruce R.; Miller, Naomi J.

    2011-05-23

    A report on a lab setting analysis involving LED lamps intended to directly replace T8 fluorescent lamps (4') showing light output, power, and economic comparisons with other fluorescent options.

  18. Developing a total replacement cost index for suburban office projects

    E-Print Network [OSTI]

    Hansen, David John, S.M. Massachusetts Institute of Technology

    2006-01-01

    Understanding the components of replacement costs for office developments, and how these components combine to create total development costs is essential for success in office real estate development. Surprisingly, the ...

  19. Drop-in replacement biofuels : meeting the challenge

    E-Print Network [OSTI]

    Bhargava, Alok (Alok Kishore)

    2011-01-01

    This thesis presents a discussion on the challenges that must be met to fulfill the U.S. Navy's strategic imperatives for its energy vision. It provides an introduction to drop-in replacement biofuels, the options amongst ...

  20. EA-0923: Winnett School District Boiler Replacement Project, Winnett, Montana

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to replace the Winnett School District complex's existing oil-fired heating system with a new coal-fired heating system with funds...

  1. Washington State Department of Ecology: Replacement Wells Requiring...

    Open Energy Info (EERE)

    Washington State Department of Ecology: Replacement Wells Requiring a Water Right Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther:...

  2. Replacement-2-A Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale Power

  3. Replacement-3 Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale

  4. Energy-efficient incandescent lamp: Final report

    E-Print Network [OSTI]

    Verderber, R.

    2010-01-01

    more energy than the best " Energy Ef- ficient Incandescentbest available conventional glass envelopes the greatest energyenvelope of best optical accuracy. The energy saving could

  5. Energy-efficient incandescent lamp: Final report

    E-Print Network [OSTI]

    Verderber, R.

    2010-01-01

    have doubled luminous efficacy, corresponding to 50% energyluminous than the clear lamp. The value of visible wattage 1n the energyluminous efficacy without l i f e reduction. Such efficacy Increase corresponds to an energy

  6. Incandescent Lighting Basics | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACT EVALUATION PLAN FOR THE SITE-218in a V2O5 Battery Electrode

  7. Energy-Saving Incandescents | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submitKansasCommunities EnergyU.S. DOEEnergy StorageTricks Lead3Image icon

  8. Energy-Saving Incandescents | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submitKansasCommunities EnergyU.S. DOEEnergy StorageTricks Lead3Image iconFile

  9. New Lighting Standards Began in 2012 | Department of Energy

    Office of Environmental Management (EM)

    save you about 50 per year when you replace 15 traditional incandescent bulbs in your home. Measuring Light in Lumens The new efficiency standards require lightbulbs to consume...

  10. 2002 Federal Energy and Water Management Award Winners | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    direct digital control installation to more simple measures, such as installing light-emitting diode technology to replace incandescent lighting in fire alarm transmission boxes....

  11. Printer Paper Brand Boise Office Max Boise Boise

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    environmental impact from deliveries. #12;Envelopes Envelope Type Padded 9 ˝" x 14 ˝" Manila 4 1/8" x 9" White-features Compostable Compostable Compostable Compostable Image/Hyperlink Light Bulbs **All compact fluorescent (CFL of bulbs properly** Incandescent Wattage CFL Equivalent LED Equivalent 40 W 9-13 W 6-8 W 60 W 13-15 W 6-8 W

  12. CALiPER Special Summary Report: Retail Replacement Lamp Testing

    SciTech Connect (OSTI)

    2011-04-01

    CALiPER testing has evaluated many products for commercial lighting markets and found some excellent performers. However, many of these are not available on the retail market. This special testing was undertaken to identify and test solid-state lighting (SSL) replacement lamp products that are available to the general public through retail stores and websites.

  13. Replacing the whole barrel of oil with plants and microbes

    SciTech Connect (OSTI)

    Simmons, Blake

    2013-05-29

    In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

  14. Replacing the whole barrel of oil with plants and microbes

    ScienceCinema (OSTI)

    Simmons, Blake

    2014-06-24

    In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

  15. HVAC & Building Management Control System Energy Efficiency Replacements

    SciTech Connect (OSTI)

    Hernandez, Adriana

    2012-09-21

    The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

  16. Measure Guideline. Wood Window Repair, Rehabilitation, and Replacement

    SciTech Connect (OSTI)

    Baker, P.; Eng, P.

    2012-12-01

    This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

  17. CALiPER Exploratory Study Retail Replacement Lamps – 2011

    SciTech Connect (OSTI)

    2012-04-02

    In 2010, CALiPER conducted a study on LED replacement lamps found in retail stores. The results were less than satisfactory, and many products were classified as being unlikely to meet consumer expectations. In November 2011, CALiPER purchased a new sample of products for a follow-up study, with the intent of characterizing the progress of this essential market segment.

  18. Brief Report Replacement of Adenovirus Type 5 Fiber Shaft

    E-Print Network [OSTI]

    Hemminki, Akseli

    Brief Report Replacement of Adenovirus Type 5 Fiber Shaft Heparan Sulfate Proteoglycan-binding domain of the fiber shaft to GATK results in liver transduction detargeting, but it is not compatible shaft location efficiently enhances the infectivity of adenovirus and improves the tumor

  19. FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL

    E-Print Network [OSTI]

    Vázquez-Abad, Felisa J.

    @iro.umontreal.ca SYNOPTIC ABSTRACT We consider a multicomponent system with identical components subject to failures­ generative simulation, maintenance models, age replacement policies. #12; L'ECUYER, MARTIN, AND V ' AZQUEZ­ABAD 1. INTRODUCTION We consider a system with M identical components subject to failures. Each time

  20. Selection and Implementation of a Replacement Cutting Tool Selection Application

    SciTech Connect (OSTI)

    Rice, Gordon

    2008-10-06

    A new commercial cutting tool software package replaced an internally created legacy system. This report describes the issues that surfaced during the migration and installation of the commercial package and the solutions employed. The primary issues discussed are restructuring the data between two drastically different database schemas and the creation of individual component graphics.

  1. Replacement of alloy 800H superheated steam line

    SciTech Connect (OSTI)

    Barbier, R.A.; Bullock, J.W. [Sterling Chemicals, Texas City, TX (United States)

    1996-07-01

    Sterling Chemicals utilizes alloy 800HT (UNS N08811) piping for superheated steam service in its styrene dehydrogenation unit. An engineering project to replace these lines was recently completed. Material acquisition, shop fabrication, inspection requirements, and field erection will be highlighted in this paper.

  2. IDS120i GEOMETRY. SIMULATIONS FOR 60%W+40%He SHIELDING WITH

    E-Print Network [OSTI]

    McDonald, Kirk

    HALF ONLY(RIGHT ). 3 #12;CENTER OF BEAM PROTONS TRAJECTORY FOR Hg(BLACK) AND Ga(RED) TARGETS. (POOL the pool) PROTONS ENTER Ga POOL NEAR THE CENTER AND HAVE A SHORT PATH, ONE WAY TO IMPROVE THIS IS BY SHIFTING THE POOL TO THE RIGHT(~ 100 cm) 4 ) #12;5 CENTER OF BEAM PROTONS TRAJECTORY FOR Hg AND Ga TARGETS

  3. IDS120h AND IDS120i GEOMETRY. SIMULATIONS FOR 60%W+40%He SHIELDING WITH

    E-Print Network [OSTI]

    McDonald, Kirk

    THICK). MODIFIED Hg POOL EXTENTS FROM 86 cm TO ~300 cm ALONG THE z-AXIS AND UP ~50 cm RADIALLY SH1-->SH1 cm) 1 cm THICK STST WALLS USED FOR THE Hg POOL VESSEL #12;CENTER OF BEAM PROTONS TRAJECTORY FOR Hg(BLACK) AND Ga(RED) TARGETS. (POOL SURFACE IN FIRST PLOT IS AT y= - 15 cm BUT FOR SIMULATIONS y= - 20 cm) Y X XZ

  4. 66"W 64'W 6: w 60 W 58"W 56-W H-Niv- ;--

    E-Print Network [OSTI]

    Beaumont, Christopher

    and Natural Resources) are shown in brown. Wells drilled in the Scotian Basin are marked by dots. Bathymetry is shown in Figure 1.3. The white-dotted area indicates the salt distribution along slope diapiric province on the continental slope and shelf. The average velocity of 4.5 km/s for the salt diapirs (85) is constrained

  5. OSRAM SYLVANIA Develops High-Efficiency LED Troffer Replacement

    Broader source: Energy.gov [DOE]

    With the help of DOE funding, OSRAM SYLVANIA is developing a high-efficiency LED 2'x2' troffer replacement that is expected to be commercially available in the spring of 2012 and to be cost-competitive with existing troffers of that size. It is projected to have a light output of up to 4,000 lumens, an efficacy of more than 100 lm/W, and a CCT of 3500K.

  6. Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement

    SciTech Connect (OSTI)

    Springer, D.; Dakin, B.

    2013-03-01

    This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

  7. Trenchless rehabilitation: Which choice for gas distribution pipe replacement?

    SciTech Connect (OSTI)

    Kramer, S.R. [Jason Consultants International, Washington, DC (United States); Gauthier, S.W. [Gas Research Inst., Chicago, IL (United States)

    1995-01-01

    Replacement or rehabilitation of deteriorating gas piping currently relies largely on open-cut excavation or pipe insertion. Open-cut replacement is satisfactory for communities where adverse environmental impact can be tolerated and road closures and traffic delays are kept to a minimum. However, most of the systems in need of replacement/rehabilitation are in urban areas where environmental impact, traffic delays, and site restoration costs are costly. With these parameters in mind, the Gas Research Institute (GRI); and its member organizations designed a research program to test and evaluate promising trenchless technologies for potential use in gas distribution rehabilitation projects. The programs`s goals were to identify product strengths, weaknesses, cost, applications, and recognition of areas which needed modification or further development. During this research a significant amount of data were gathered. All rehabilitation systems maximize pipe capacity while minimizing surface disruptions. Cost savings realized by some of the participating utilities was significant. This is even more impressive when one considers that this was the first gas installation for some of the methods. A summary of advantages, disadvantages, and lessons learned from each process is shown on Tables 2--6. Comments listed are for field trials conducted and may not be accurate or applicable to other projects. A common limitation of all rehabilitation methods is lack of a complete system with appropriate tees, fittings, transition materials, and other connection devices.

  8. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  9. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  10. Demonstration Assessment of Light Emitting Diode (LED) Residential Downlights and Undercabinet Lights in the Lane County Tour of Homes, Eugene, Oregon

    SciTech Connect (OSTI)

    Ton, My K.; Richman, Eric E.; Gilbride, Theresa L.

    2008-11-10

    In August 2008 the Pacific Northwest National Laboratory (PNNL) conducted a light emitting diode (LED) residential lighting demonstration project for the U.S. Department of Energy (DOE), Office of Building Technologies, as part of DOE’s Solid State Lighting (SSL) Technology Demonstration Gateway Program. Two lighting technologies, an LED replacement for downlight lamps (bulbs) and an LED undercabinet lighting fixture, were tested in the demonstration which was conducted in two homes built for the 2008 Tour of Homes in Eugene, Oregon. The homes were built by the Lane County Home Builders Association (HBA), and Future B Homes. The Energy Trust of Oregon (ETO) also participated in the demonstration project. The LED downlight product, the LR6, made by Cree LED Lighting Solutions acts as a screw-in replacement for incandescent and halogen bulbs in recessed can downlights. The second product tested is Phillips/Color Kinetics’ eW® Profile Powercore undercabinet fixture designed to mount under kitchen cabinets to illuminate the countertop and backsplash surfaces. Quantitative and qualitative measurements of light performance and electrical power usage were taken at each site before and after initially installed halogen and incandescent lamps were replaced with the LED products. Energy savings and simple paybacks were also calculated and builders who toured the homes were surveyed for their responses to the LED products. The LED downlight product drew 12 Watts of power, cutting energy use by 82% compared to the 65W incandescent lamp and by 84% compared to the 75W halogen lamp. The LED undercabinet fixture drew 10 watts, cutting energy use by 83% to 90% compared to the halogen product, which was tested at two power settings: a low power 60W setting and a high power 105W setting. The LED downlight consistently provided more light than the halogen and incandescent lamps in horizontal measurements at counter height and floor level. It also outperformed in vertical illuminance measurements taken on the walls, indicating better lateral dispersion of the light. The undercabinet fixture’s light output was midway between the low and high power halogen undercabinet fixture light outputs (35.8 foot candle versus 13.4 fc and 53.4 fc) but it produced a more uniform light (max/min ratio of 7.0 versus 10.8). The color correlated temperature (CCT, the blue or yellowness) of the LED light correlated well with the halogen and incandescent lights (2675 K vs 2700 K). The color rendering of the LED downlight also correlated well at 92 CRI compared to 100 CRI for the halogen and incandescent lamps. The LED undercabinet fixture had measures of 2880 K CCT and 71 CRI compared to the 2700 K and 100 CRI scores for the halogen undercabinet fixture. Builders who toured the homes were surveyed; they gave the LED downlight high marks for brightness, said the undercabinet improved shadows and glare and said both products improved overall visibility, home appearance, and home value. Paybacks on the LED downlight ranged from 7.6 years (assuming electricity cost of 11 c/kWh) to 13.5 years (at 5C/kWh). Paybacks on the LED undercabinet fixture in a new home ranged from 4.4 years (11c/kWh electricity) to 7.6 years (5c/kWh) based on product costs of $95 per LED downlight and $140 per LED undercabinet fixture at 3 hrs per day of usage for the downlight and 2 hrs per day for the undercabinet lighting.

  11. Is it Cost-Effective to Replace Old Eddy-Current Drives? | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Is it Cost-Effective to Replace Old Eddy-Current Drives? Is it Cost-Effective to Replace Old Eddy-Current Drives? New pulse-width-modulated (PWM) adjustable speed drives (ASDs) may...

  12. Programmatic mission capabilities - chemistry and metallurgy research replacement (CMRR) project

    SciTech Connect (OSTI)

    Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

    2011-01-04

    CMRR will have analysis capabilities that support all the nuclear-material programs and national security needs. CMRR will replace the aging CMR Building and provide a key component responsive infrastructure necessary to sustain all nuclear programs and the nuclear-weapons complex. Material characterization capabilities - evaluate the microstructures and properties of nuclear materials and provide experimental data to validate process and performance models. Analytical chemistry capabilities - provide expertise in chemical and radiochemical analysis of materials where actinide elements make up a significant portion of the sample.

  13. Electronic-type vacuum gauges with replaceable elements

    DOE Patents [OSTI]

    Edwards, D. Jr.

    1984-09-18

    In electronic devices for measuring pressures in vacuum systems, the metal elements which undergo thermal deterioration are made readily replaceable by making them parts of a simple plug-in unit. Thus, in ionization gauges, the filament and grid or electron collector are mounted on the novel plug-in unit. In thermocouple pressure gauges, the heater and attached thermocouple are mounted on the plug-in unit. Plug-in units have been designed to function, alternatively, as ionization gauge and as thermocouple gauge, thus providing new gauges capable of measuring broader pressure ranges than is possible with either an ionization gauge or a thermocouple gauge. 5 figs.

  14. Electronic-type vacuum gauges with replaceable elements

    DOE Patents [OSTI]

    Edwards, Jr., David (7 Brown's La., Bellport, NY 11713)

    1984-01-01

    In electronic devices for measuring pressures in vacuum systems, the metal elements which undergo thermal deterioration are made readily replaceable by making them parts of a simple plug-in unit. Thus, in ionization gauges, the filament and grid or electron collector are mounted on the novel plug-in unit. In thermocouple pressure gauges, the heater and attached thermocouple are mounted on the plug-in unit. Plug-in units have been designed to function, alternatively, as ionization gauge and as thermocouple gauge, thus providing new gauges capable of measuring broader pressure ranges than is possible with either an ionization gauge or a thermocouple gauge.

  15. Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA

    E-Print Network [OSTI]

    Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA Submitted to Dr. Bi By Bernard Chan Pellets for UBC Boilers Replacing Natural Gas" By Bernard Chan, Brian Chan, and Christopher Young Abstract This report studies the feasibility of replacing natural gas with wood pellets for UBC boilers. A gasification

  16. Experimental study on the cause of insufficiency of a transcutaneous pulmonary valve replacement

    E-Print Network [OSTI]

    Berlin,Technische Universität

    Experimental study on the cause of insufficiency of a transcutaneous pulmonary valve replacement Peter Jülg, Sason von der Heyde Purpose: Within the EU-funded research project LifeValve the German for the replacement of pulmonary heart valves. This technique is a minimally invasive alternative to the replacement

  17. Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions

    E-Print Network [OSTI]

    Montes-Hernandez, German

    Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions Romain Available online 8 March 2012 Keywords: A1. Mineral replacement rate A1. Serpentinization A1. TG analyses B1. Alkaline medium B2. Chrysotile nanotubes a b s t r a c t Olivine mineral replacement by serpentine is one

  18. Final Independent External Peer Review Report Olmsted Locks and Dam 52 and 53 Replacement

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Final Independent External Peer Review Report Olmsted Locks and Dam 52 and 53 Replacement Project Review Report Olmsted Locks and Dam 52 and 53 Replacement Project Updated Cost Estimate Peer Review and Dam 52 and 53 Replacement Project Updated Cost Estimate Peer Review EXECUTIVE SUMMARY Project

  19. Nuclear criticality safety assessment of the proposed CFC replacement coolants

    SciTech Connect (OSTI)

    Jordan, W.C.; Dyer, H.R.

    1993-12-01

    The neutron multiplication characteristics of refrigerant-114 (R-114) and proposed replacement coolants perfluorobutane (C{sub 4}F{sub 10}) and cycloperfluorobutane C{sub 4}F{sub 8}) have been compared by evaluating the infinite media multiplication factors of UF{sub 6}/H/coolant systems and by replacement calculations considering a 10-MW freezer/sublimer. The results of these comparisons demonstrate that R-114 is a neutron absorber, due to its chlorine content, and that the alternative fluorocarbon coolants are neutron moderators. Estimates of critical spherical geometries considering mixtures of UF{sub 6}/HF/C{sub 4}F{sub 10} indicate that the flourocarbon-moderated systems are large compared with water-moderated systems. The freezer/sublimer calculations indicate that the alternative coolants are more reactive than R-114, but that the reactivity remains significantly below the condition of water in the tubes, which was a limiting condition. Based on these results, the alternative coolants appear to be acceptable; however, several follow-up tasks have been recommended, and additional evaluation will be required on an individual equipment basis.

  20. Operational Readiness Review: Savannah River Replacement Tritium Facility

    SciTech Connect (OSTI)

    Not Available

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members.

  1. DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF

    SciTech Connect (OSTI)

    Krementz, D.; Coughlin, Jeffrey

    2009-05-05

    The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manually or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. Extensive testing of tooling operation was performed in the DWPF manipulator repair shop. This testing allowed the operators to gain confidence before the equipment was exposed to radioactive contamination. The testing also led to multiple design improvements. On July 17 and 29, 2008 the Remote Gasket Replacement Tooling was successfully demonstrated in the REDC at the DWPF of The Savannah River Site.

  2. Replacing precious metals with carbide catalysts for hydrogenation reactions

    SciTech Connect (OSTI)

    Ruijun, Hou; Chen, Jingguang G.; Chang, Kuan; Wang, Tiefeng

    2015-03-03

    Molybdenum carbide (Mo?C and Ni/Mo?C) catalysts were compared with Pd/SiO? for the hydrogenation of several diene molecules, 1,3- butadiene, 1,3- and 1,4-cyclohexadiene (CHD). Compared to Pd/SiO?, Mo?C showed similar hydrogenation rate for 1,3-butadiene and 1,3-CHD and even higher rate for 1,4-CHD, but with significant deactivation rate for 1,3-CHD hydrogenation. However, the hydrogenation activity of Mo?C could be completely regenerated by H? treatment at 723 K for the three molecules. The Ni modified Mo?C catalysts retained similar activity for 1,3-butadiene hydrogenation with significantly enhanced selectivity for 1-butene production. The 1-butene selectivity increased with increasing Ni loading below 15%. Among the Ni modified Mo?C catalysts, 8.6%Ni/Mo?C showed the highest selectivity to 1-butene, which was even higher selectivity than that over Pd/SiO?. Compared to Pd/SiO?, both Mo?C and Ni/Mo?C showed combined advantages in hydrogenation activity and catalyst cost reduction, demonstrating the potential to use less expensive carbide catalysts to replace precious metals for hydrogenation reactions.

  3. Replacing precious metals with carbide catalysts for hydrogenation reactions

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ruijun, Hou [Tsinghua Univ., Beijing (China). Beijing Key Lab. of Green Chemical Reaction Engineering and Technology; Columbia Univ., New York, NY (United States); Chen, Jingguang G. [Columbia Univ., New York, NY (United States); Brookhaven National Lab. (BNL), Upton, NY (United States); Chang, Kuan [Tsinghua Univ., Beijing (China). Beijing Key Lab. of Green Chemical Reaction Engineering and Technology; Wang, Tiefeng [Tsinghua Univ., Beijing (China). Beijing Key Lab. of Green Chemical Reaction Engineering and Technology

    2015-04-01

    Molybdenum carbide (Mo?C and Ni/Mo?C) catalysts were compared with Pd/SiO? for the hydrogenation of several diene molecules, 1,3- butadiene, 1,3- and 1,4-cyclohexadiene (CHD). Compared to Pd/SiO?, Mo?C showed similar hydrogenation rate for 1,3-butadiene and 1,3-CHD and even higher rate for 1,4-CHD, but with significant deactivation rate for 1,3-CHD hydrogenation. However, the hydrogenation activity of Mo?C could be completely regenerated by H? treatment at 723 K for the three molecules. The Ni modified Mo?C catalysts retained similar activity for 1,3-butadiene hydrogenation with significantly enhanced selectivity for 1-butene production. The 1-butene selectivity increased with increasing Ni loading below 15%. Among the Ni modified Mo?C catalysts, 8.6%Ni/Mo?C showed the highest selectivity to 1-butene, which was even higher selectivity than that over Pd/SiO?. Compared to Pd/SiO?, both Mo?C and Ni/Mo?C showed combined advantages in hydrogenation activity and catalyst cost reduction, demonstrating the potential to use less expensive carbide catalysts to replace precious metals for hydrogenation reactions.

  4. Replacing precious metals with carbide catalysts for hydrogenation reactions

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ruijun, Hou; Chen, Jingguang G.; Chang, Kuan; Wang, Tiefeng

    2015-03-03

    Molybdenum carbide (Mo?C and Ni/Mo?C) catalysts were compared with Pd/SiO? for the hydrogenation of several diene molecules, 1,3- butadiene, 1,3- and 1,4-cyclohexadiene (CHD). Compared to Pd/SiO?, Mo?C showed similar hydrogenation rate for 1,3-butadiene and 1,3-CHD and even higher rate for 1,4-CHD, but with significant deactivation rate for 1,3-CHD hydrogenation. However, the hydrogenation activity of Mo?C could be completely regenerated by H? treatment at 723 K for the three molecules. The Ni modified Mo?C catalysts retained similar activity for 1,3-butadiene hydrogenation with significantly enhanced selectivity for 1-butene production. The 1-butene selectivity increased with increasing Ni loading below 15%. Among the Nimore »modified Mo?C catalysts, 8.6%Ni/Mo?C showed the highest selectivity to 1-butene, which was even higher selectivity than that over Pd/SiO?. Compared to Pd/SiO?, both Mo?C and Ni/Mo?C showed combined advantages in hydrogenation activity and catalyst cost reduction, demonstrating the potential to use less expensive carbide catalysts to replace precious metals for hydrogenation reactions.« less

  5. Polymeric materials replacement issues for the LANL stockpile.

    SciTech Connect (OSTI)

    Sandoval, C. W. (Cynthia W.); Gladysz, G. M. (Gary M.); Stephens, T. S. (Thomas S.); Gleiman, S. S. (Seth S.); Mendoza, D. (Daniel); Baker, G. K. (G. Keith); Schoonover, J. R. (Jon R.); Schneider, Jim; Perry, B. (Brian); Lula, J. W.

    2002-01-01

    A number of materials in the LANL stockpile are no longer available due to lack of availability or environment, safety and health issues. Silastic S-5370 a polysiloxane foam used to manufacture multiple components in LANL systems has been discontinued by Dow Corning. Kerimid 601 is a polyimide resin used as the binder for the syntactic foam used as a support material in the W76. It contains MDA, which has been identified by OSHA as a carcinogen and is no longer used in the nuclear weapons complex. In addition, the Thornel carbon mat used in the syntactic foam formulation is no longer available. These issues have created major challenges in the effort to reestablish aft support production capability for the W76 LEP. Urethane Encapsulant 7200, an adhesive used to bond explosive booster pellets and detonator components, was originally manufactured by Hexcel Corporation and is no longer available. The details of the projects currently underway to provide replacements for these materials will be discussed.

  6. Percutaneous aortic valve replacement in a re-animated postmortem heart

    E-Print Network [OSTI]

    White, Jennifer; Sun, Amy; Killien, Lauren; Evangelista, Dennis

    2006-01-01

    implantation of heart valve prosthesis for the treatment ofF. Percutaneous aortic valve replacement: an experimentalA stentless trileaflet valve from a sheet of decellularized

  7. Is it Cost-Effective to Replace Old Eddy-Current Drives? - Motor Tip Sheet #12

    SciTech Connect (OSTI)

    2008-07-01

    New pulse-width-modulated (PWM) adjustable speed drives (ASDs) may be cost-effective replacements for aging or maintenance-intensive eddy-current drives.

  8. Text-Alternative Version: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR®

    Office of Energy Efficiency and Renewable Energy (EERE)

    Below is the text-alternative version of the LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® webcast.

  9. Feasibility/alternatives study for the planned replacement of Nuclear Material Safeguards System (NMSS)

    SciTech Connect (OSTI)

    McBride, K.C.; Russell, V.K.

    1994-10-04

    This document is a study which describes the NMSS replacement alternatives and provides recommended solutions. It also describes a NMSS Paradox prototype.

  10. Is it Cost-Effective to Replace Old Eddy-Current Drives?

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (PWM) variable frequency drives (VFD) may be cost- effective replacements for aging or high-maintenance eddy-current drives that are used with variable torque loads, such...

  11. Model morphing and sequence assignment after molecular replacement

    SciTech Connect (OSTI)

    Terwilliger, Thomas C., E-mail: terwilliger@lanl.gov [Los Alamos National Laboratory, Mail Stop M888, Los Alamos, NM 87545 (United States); Read, Randy J. [University of Cambridge, Cambridge Institute for Medical Research, Cambridge CB2 0XY (United Kingdom); Adams, Paul D. [Lawrence Berkeley National Laboratory, One Cyclotron Road, Bldg 64R0121, Berkeley, CA 94720 (United States); Brunger, Axel T. [Stanford University, 318 Campus Drive West, Stanford, CA 94305 (United States); Afonine, Pavel V. [Lawrence Berkeley National Laboratory, One Cyclotron Road, Bldg 64R0121, Berkeley, CA 94720 (United States); Hung, Li-Wei [Los Alamos National Laboratory, Mail Stop M888, Los Alamos, NM 87545 (United States)

    2013-11-01

    A procedure for model building is described that combines morphing a model to match a density map, trimming the morphed model and aligning the model to a sequence. A procedure termed ‘morphing’ for improving a model after it has been placed in the crystallographic cell by molecular replacement has recently been developed. Morphing consists of applying a smooth deformation to a model to make it match an electron-density map more closely. Morphing does not change the identities of the residues in the chain, only their coordinates. Consequently, if the true structure differs from the working model by containing different residues, these differences cannot be corrected by morphing. Here, a procedure that helps to address this limitation is described. The goal of the procedure is to obtain a relatively complete model that has accurate main-chain atomic positions and residues that are correctly assigned to the sequence. Residues in a morphed model that do not match the electron-density map are removed. Each segment of the resulting trimmed morphed model is then assigned to the sequence of the molecule using information about the connectivity of the chains from the working model and from connections that can be identified from the electron-density map. The procedure was tested by application to a recently determined structure at a resolution of 3.2 Ĺ and was found to increase the number of correctly identified residues in this structure from the 88 obtained using phenix.resolve sequence assignment alone (Terwilliger, 2003 ?) to 247 of a possible 359. Additionally, the procedure was tested by application to a series of templates with sequence identities to a target structure ranging between 7 and 36%. The mean fraction of correctly identified residues in these cases was increased from 33% using phenix.resolve sequence assignment to 47% using the current procedure. The procedure is simple to apply and is available in the Phenix software package.

  12. Category theory based solution for the building block replacement problem in materials design

    E-Print Network [OSTI]

    Spivak, David

    1 Category theory based solution for the building block replacement problem in materials design blocks, theory, modeling, mathematics, hierarchical materials Submitted to: Advanced Engineering be replaced by other molecular structures, such as weak van der Waals or hydrogen bonds, without compromising

  13. Fundamenta Informaticae 72 (2006) 129 1 Adhesive High-Level Replacement Systems

    E-Print Network [OSTI]

    Habel, Annegret

    2006-01-01

    Fundamenta Informaticae 72 (2006) 1­29 1 IOS Press Adhesive High-Level Replacement Systems: A New. Adhesive high-level replacement (HLR) systems are introduced as a new categorical framework for graph with the new concept of adhesive categories introduced by Lack and Soboci´nski. In this paper we show that most

  14. Final Independent External Peer Review Report Olmsted Locks and Dam 52 and 53 Replacement

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Final Independent External Peer Review Report Olmsted Locks and Dam 52 and 53 Replacement Project Review Report Olmsted Locks and Dam 52 and 53 Replacement Project Post Authorization Change Report--0002 Task Order: 0005 #12;This page is intentionally left blank. #12;Olmsted Locks and Dam PACR IEPR i

  15. Library of Science & Medicine Roof Replacement and Related Work Dec. 11, 2000 DSR # 0059-00 BSH

    E-Print Network [OSTI]

    Library of Science & Medicine Roof Replacement and Related Work Dec. 11, 2000 DSR # 0059-00 BSH AFFIDAVIT OF NON-USE OF ASBESTOS Project: Roof Replacement and Related Work at LIBRARY OF SCIENCE & MEDICINE

  16. Percutaneous aortic valve replacement in a re-animated postmortem heart

    E-Print Network [OSTI]

    White, Jennifer; Sun, Amy; Killien, Lauren; Evangelista, Dennis

    2006-01-01

    aortic valve replacements, para-valvular leakage wasof valves designed to prevent para-valvular leakage. Multi-leakage was minimal or absent, most likely due to the lack of native valve

  17. Emerging Trends in Heart Valve Engineering: Part III. Novel Technologies for Mitral Valve Repair and Replacement

    E-Print Network [OSTI]

    2015-01-01

    and J. D. Puskas. Mitral-valve repair versus replacement forbioprosthetic heart valves. Ann. Thorac. Surg. 71:S417–mechanics of arti?cial heart valves. Clin. Exp. Pharmacol.

  18. Emerging Trends in Heart Valve Engineering: Part II. Novel and Standard Technologies for Aortic Valve Replacement

    E-Print Network [OSTI]

    2015-01-01

    toronto stentless porcine valve. Ann. Thorac. Surg. 78:2076–medical mechanical cardiac valve prosthesis. Ann. Thorac.or surgical aortic-valve replacement. New Engl. J. Med. 366:

  19. Replacing the Whole BarrelTo Reduce U.S. Dependence on Oil |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reduce U.S. Dependence on Oil Replacing the Whole BarrelTo Reduce U.S. Dependence on Oil Converting domestic biomass into affordable fuels, products, and power supports our...

  20. Replace Pressure-Reducing Valves with Backpressure Turbogenerators - Steam Tip Sheet #20

    SciTech Connect (OSTI)

    2012-01-01

    This revised AMO steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  1. Case Study Walnut Hill United Methodist Church - Dallas, Texas, Chiller Replacement Analysis 

    E-Print Network [OSTI]

    Phillips, J.

    1998-01-01

    In March of 1992 Walnut Hill United Methodist Church in Dallas, Tx. decided that their existing thermal storage and electric reciprocating chiller system were both in need of replacement. After analyzing several options, they chose to install 150...

  2. [Minor revisionposted 3/19/15 (replaces 2/7/12 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    OP 10.12 [Minor revision­posted 3/19/15 (replaces 2/7/12 edition)] Operating Policy and Procedure orientation with regard to admission, employment, or use of the programs, facilities, or services of Texas

  3. Replacing cellular with WiFi direct communication for a highly interactive, high bandwidth multiplayer game

    E-Print Network [OSTI]

    Ortiz, Pablo (Pablo Jose)

    2013-01-01

    The objective of this work is to explore the benefits of replacing cellular with Wi-Fi Direct communication in mobile applications. Cellular connections consume significant power on mobile devices and are too slow for many ...

  4. Variation in joint fluid composition and its effect on the tribology of replacement joint articulation

    E-Print Network [OSTI]

    Mazzucco, Daniel Clarke, 1976-

    2003-01-01

    Polyethylene wear is a significant clinical problem limiting the long-term survival of joint replacement prostheses, particularly in total hip arthroplasty (THA) and total knee arthroplasty (TKA). Although the tribology ...

  5. Centrifugal devices can replace traditional separation techniques such as column chromatography, preparative

    E-Print Network [OSTI]

    Lebendiker, Mario

    Centrifugal devices can replace traditional separation techniques such as column chromatography, preparative electrophoresis, alcohol or salt precipitation, dialysis, and gradient centrifugation when. Centrifugal Devices for Ultrafiltration & Microfiltration Nanosep®, MicrosepTM, Macrosep®, and Jumbosep

  6. Better Buildings Alliance, adidas Case Study: adidas Saves Energy and Costs with Planned RTU Replacement Program (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01

    Case study describing how adidas implemented a best practice of a planned replacement program for its RTUs.

  7. Proposal to negotiate an amendment to an existing blanket contract for the repair, recondioning or replacement of klystrons

    E-Print Network [OSTI]

    2012-01-01

    Proposal to negotiate an amendment to an existing blanket contract for the repair, recondioning or replacement of klystrons

  8. Replaces DOE F 3530.1 5. HOW LONG IN PRESENT POSITION GRADE

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale50.2

  9. Replaces EIA-459B U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MILESTONE PLAN

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale Power Rate Schedule Replacement-2-A

  10. Replacing the Whole BarrelTo Reduce U.S. Dependence on Oil | Department of

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale Power Rate Schedule Replacement-2-A 4600.4

  11. Title: Optimal Replacement in the Proportional Hazards Model with semi-Markovian Covariate Process and Continuous Monitoring

    E-Print Network [OSTI]

    Ryan, Sarah M.

    Process and Continuous Monitoring Index terms--Optimal replacement, proportional hazards model, semi1 Title: Optimal Replacement in the Proportional Hazards Model with semi-Markovian Covariate replacement problem for general deteriorating systems in the proportional hazards model with a semi

  12. Abstract--Replacing open-heart surgical procedures with beating-heart interventions substantially decreases the trauma

    E-Print Network [OSTI]

    Dupont, Pierre

    Abstract-- Replacing open-heart surgical procedures with beating-heart interventions substantially on the beating heart is valve repair. To address this need, this paper proposes a tool for replacing mitral valve replacement and reduction of regurgitation was demonstrated in an ex-vivo heart simulator. I. INTRODUCTION UE

  13. Underwater Lighting by Submerged Lasers and Incandescent Sources

    E-Print Network [OSTI]

    Duntley, Seibert Q

    1971-01-01

    case contains a rotary solenoid with its axle protrudingcylinder containing a rotary solenoid is mount- ed above theshown in Fig. 7-9 is a rotary solenoid which is a part This

  14. A Bright Idea: New Efficiency Standards for Incandescent and Fluorescent

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing ToolInternationalReportOffice | DepartmentVery1, in: Statement of Dr.26Former|A

  15. DOE Requires Manufacturer and Labeler to Cease Sale of Incandescent

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based| Department ofRefrigeratorsDepartmentEP9425

  16. How Energy-Efficient Light Bulbs Compare with Traditional Incandescents |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuelsof Energy ServicesContracting OversightEMSHome

  17. Save Energy this Independence Day | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    to look for rebates on these appliances. Changing incandescent light bulbs to CFLs or LEDs can save as much as 80% a year on lighting costs. Replacing 15 inefficient...

  18. 90.6% efficient 11MHz 22W LED driver using GaN FETs and burst-mode controller with 0.96 power factor

    E-Print Network [OSTI]

    Chandrakasan, Anantha P.

    With the advent of reliable, high brightness and high efficacy LEDs, the lighting industry is expected to see a significant growth in the near future. However, for LEDs to completely replace the traditional incandescent ...

  19. 10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-05-01

    The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification.

  20. Replacement of outboard main steam isolation valves in a boiling water reactor plant

    SciTech Connect (OSTI)

    Schlereth, J.R.; Pennington, D.

    1996-12-01

    Most Boiling Water Reactor plants utilize wye pattern globe valves for main steam isolation valves for both inboard and outboard isolation. These valves have required a high degree of maintenance attention in order to pass the plant local leakage rate testing (LLRT) requirements at each outage. Northern States Power made a decision in 1993 to replace the outboard valves at it`s Monticello plant with double disc gate valves. The replacement of the outboard valves was completed during the fall outage in 1994. During the spring outage in April of 1996 the first LLRT testing was performed with excellent results. This presentation will address the decision process, time requirements and planning necessary to accomplish the task as well as the performance results and cost effectiveness of replacing these components.

  1. Replaces EIA-459C All Other Editions Are Obsolete OMB Control No.

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale Power Rate Schedule Replacement-2-A 4600.4 (04-94)

  2. Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX

    E-Print Network [OSTI]

    Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX SECTION 02071 - REMOVAL OF ASBESTOS CONTAINING ROOFING MATERIAL (Rev.9/00) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings Specification Sections, apply to this Section. B. Refer to Drawing C-1, "Existing Roof System Components Chart

  3. Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX

    E-Print Network [OSTI]

    Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX SECTION 02072 - REMOVAL OF INTACT INCIDENTAL ASBESTOS CONTAINING ROOFING MATERIAL (Rev.9/00) PART 1 - GENERAL 1.1 RELATED DOCUMENTS Roof System Components Chart" for location of asbestos containing roofing materials. 1.2 SUMMARY A

  4. Properties of potential eco-friendly gas replacements for particle detectors in high-energy physics

    E-Print Network [OSTI]

    Benussi, L; Piccolo, D; Saviano, G; Colafranceschi, S; Kjřlbro, J; Sharma, A; Yang, D; Chen, G; Ban, Y; Li, Q

    2015-01-01

    Modern gas detectors for detection of particles require F-based gases for optimal performance. Recent regulations demand the use of environmentally unfriendly F-based gases to be limited or banned. This review studies properties of potential eco-friendly gas candidate replacements.

  5. Properties of potential eco-friendly gas replacements for particle detectors in high-energy physics

    E-Print Network [OSTI]

    Benussi, L; Piccolo, D; Saviano, G; Colafranceschi, S; Kjřlbro, J; Yang, D; Chen, G; Ban, Y; Li, Q; Sharma, A

    2015-01-01

    Modern gas detectors for detection of particles require F-based gases for op- timal performance. Recent regulations demand the use of environmentally un- friendly Freon-based gases to be limited or banned. This review studies properties of potential eco-friendly gas candidate replacements.

  6. Principles and Efficient Implementation of Charge Replacement in Hybrid Electrical Energy Storage

    E-Print Network [OSTI]

    Pedram, Massoud

    1 Principles and Efficient Implementation of Charge Replacement in Hybrid Electrical Energy Storage energy generation and consumption rates are typ- ically not matched with each other. Electrical energy of the electrical energy, mitigate the supply-demand mismatch- es, and reduce the power generation capacity required

  7. Functionalized Graphene Sheets as a Versatile Replacement for Platinum in Dye-Sensitized Solar Cells

    E-Print Network [OSTI]

    Aksay, Ilhan A.

    ) this residue must not disperse in the electrolyte. KEYWORDS: graphene, dye-sensitized solar cell, cobalt redoxFunctionalized Graphene Sheets as a Versatile Replacement for Platinum in Dye-Sensitized Solar) electrodes were tested for catalytic performance in dye-sensitized solar cells (DSSCs). By using ethyl

  8. Bus Fleet Type and Age Replacement Optimization: A case study utilizing King County Metro fleet data

    E-Print Network [OSTI]

    Bertini, Robert L.

    and fuel economy. Fuel price, emissions costs, and initial bus age have little impact on optimal replacement policies. However, discount rate and diesel bus price, annual utilization (in 0% FTA subsidy scenario) and fuel price (in 80% FTA subsidy scenario) have the highest impacts on per-mile costs. #12;2 1

  9. Conformationally constrained farnesoid X receptor (FXR) agonists: Heteroaryl replacements of the naphthalene

    SciTech Connect (OSTI)

    Bass, Jonathan Y.; Caravella, Justin A.; Chen, Lihong; Creech, Katrina L.; Deaton, David N.; Madauss, Kevin P.; Marr, Harry B.; McFadyen, Robert B.; Miller, Aaron B.; Mills, Wendy Y.; Navas, III, Frank; Parks, Derek J.; Smalley, Jr., Terrence L.; Spearing, Paul K.; Todd, Dan; Williams, Shawn P.; Wisely, G. Bruce

    2014-08-13

    To improve on the drug properties of GSK8062 1b, a series of heteroaryl bicyclic naphthalene replacements were prepared. The quinoline 1c was an equipotent FXR agonist with improved drug developability parameters relative to 1b. In addition, analog 1c lowered body weight gain and serum glucose in a DIO mouse model of diabetes.

  10. Review, reduce, and replace: The three `R's of energy security Larry Hughes

    E-Print Network [OSTI]

    Hughes, Larry

    ERG2007/01 Review, reduce, and replace: The three `R's of energy security Larry Hughes Energy: The three `R's of energy security 1 Abstract Rising world energy costs, increasing demand for energy contributed to national and international concerns over energy security. If a jurisdiction's energy security

  11. [Major revisionposted 12/12/13 (replaces 1/21/11 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    OP 34.20 [Major revision­posted 12/12/13 (replaces 1/21/11 edition)] Operating Policy and Procedure OP 34.20: Study Abroad Programs DATE: December 12, 2013 PURPOSE: The purpose of this Operating Policy/Procedure (OP) is to enable more students to participate in TTU study abroad programs by ensuring that those

  12. [Major revisionposted 9/15/14 (replaces 6/26/06 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    OP 64.01 [Major revision­posted 9/15/14 (replaces 6/26/06 edition)] Operating Policy and Procedure program or certain non-degree programs, the admission is dependent upon the recommendation for admission. Students applying to degree programs should consult their prospective department since many

  13. [Major revisionposted 12/12/13 (replaces 9/2/08 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    OP 34.26 [Major revision­posted 12/12/13 (replaces 9/2/08 edition)] Operating Policy and Procedure OP 34.26: Faculty-led Study Abroad Programs DATE: December 12, 2013 PURPOSE: The purpose programs by ensuring that those programs are: 1. Student-centered; 2. In conformity with standards

  14. [Minor revisionposted 2/12/14 (replaces 7/13/11 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    OP 36.02 [Minor revision­posted 2/12/14 (replaces 7/13/11 edition)] Operating Policy and Procedure OP 36.02: Formula-eligible Professional Education Programs DATE: February 12, 2014 PURPOSE professional education programs that are submitted for state funding. REVIEW: This OP will be reviewed

  15. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project, Malheur County, Oregon

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with the Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of the proposed authorization of a right of way to the Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA’s proposed action was to fund the project

  16. Optimization of opportunistic replacement activities: A case study in the aircraft industry

    E-Print Network [OSTI]

    Patriksson, Michael

    examples are power plants (e.g., water and nuclear plants), processing industry (e.g., paper plantsOptimization of opportunistic replacement activities: A case study in the aircraft industry Torgny Svensson # Abstract In the aircraft industry maximizing availability is essential. Maintenance schedules

  17. PBLRU: A SelfTuning Power Aware Storage Cache Replacement Algorithm for Conserving Disk Energy #

    E-Print Network [OSTI]

    Zhou, Yuanyuan

    PB­LRU: A Self­Tuning Power Aware Storage Cache Replacement Algorithm for Conserving Disk Energy is an important concern at data centers, where storage systems consume a significant fraction of the total energy of a data center, storage is one of the biggest energy consumers, consuming almost 27% of the total [1

  18. Measure Guideline. Replacing Single-Speed Pool Pumps with Variable Speed Pumps for Energy Savings

    SciTech Connect (OSTI)

    Hunt, A.; Easley, S.

    2012-05-01

    This measure guideline evaluates potential energy savings by replacing traditional single-speed pool pumps with variable speed pool pumps, and provides a basic cost comparison between continued uses of traditional pumps verses new pumps. A simple step-by-step process for inspecting the pool area and installing a new pool pump follows.

  19. A Study of the Key Variables Affecting Bus Replacement Age Decisions and1 Total Costs2

    E-Print Network [OSTI]

    Bertini, Robert L.

    A Study of the Key Variables Affecting Bus Replacement Age Decisions and1 Total Costs2 3 Jesse operational3 and maintenance (O&M) per-mile costs increase as buses age. From a purely economic4 perspective, there is a cost tradeoff between the lower O&M costs of newer fleets and their5 higher initial capital costs

  20. Development/Plasticity/Repair Hair Cell Replacement in Adult Mouse Utricles after

    E-Print Network [OSTI]

    Rubel, Edwin

    Development/Plasticity/Repair Hair Cell Replacement in Adult Mouse Utricles after Targeted Ablation of Hair Cells with Diphtheria Toxin Justin S. Golub,1 Ling Tong,1 Tot B. Ngyuen,1 Cliff R. Hume,1 Richard utricle by inserting the human diphtheria toxin receptor (DTR) gene into the Pou4f3 gene, which encodes

  1. TriopusNet: Automating Wireless Sensor Network Deployment and Replacement in Pipeline Monitoring

    E-Print Network [OSTI]

    Chu, Hao-hua

    TriopusNet: Automating Wireless Sensor Network Deployment and Replacement in Pipeline Monitoring sensor net- work system for autonomous sensor deployment in pipeline monitoring. TriopusNet works by automatically releasing sensor nodes from a centralized repository located at the source of the water pipeline

  2. Measure Guideline: Replacing Single-Speed Pool Pumps with Variable Speed Pumps for Energy Savings

    SciTech Connect (OSTI)

    Hunt, A.; Easley, S.

    2012-05-01

    The report evaluates potential energy savings by replacing traditional single-speed pool pumps with variable speed pool pumps, and provide a basic cost comparison between continued uses of traditional pumps verses new pumps. A simple step-by-step process for inspecting the pool area and installing a new pool pump follows.

  3. 5/8/2014 Page 1 Fill a Temporary Position to Replace an Employee on Leave

    E-Print Network [OSTI]

    Calgary, University of

    of the replacement is greater than 6 months, enter 006 ­ Tempoary Relief. Enter the Length of Term which Positioned Job ­ No Change. Enter Position Information 3. Enter the Position Number of the role you are looking to fill NOTE! If you do not know the Position Number, you can use the Look Up button and search

  4. Promoting plumbing fixture and fitting replacement: Recommendations and review for state and local water resource authorities

    SciTech Connect (OSTI)

    Dunham, C.; Lutz, J.D.; Pickle, S.J.

    1995-06-01

    Lawrence Berkeley National Laboratory (LBNL) has prepared this report to facilitate compliance with the requirements of Section 123 of the Energy Policy Act of 1992 (EPACT). Section 123 requires the Department of Energy to issue recommendations for establishing state and local incentive programs to encourage acceleration of voluntary consumer replacement of existing water closets, urinals, showerheads and faucets with water-saving products meeting EPACT standards. The authors recommend that state and local authorities working together and also with utilities: (A) investigate the cost-effectiveness of voluntary replacement of plumbing fixtures and fittings as an effective component of a water efficiency incentive program; (B) allow utilities to distribute the costs of water saving products by billing at pre-installation rates until devices have been paid for; (C) encourage decreased water usage by establishing rate structures such as increasing block rates or seasonal pricing; (D) add additional incentive to rebate programs by making the rebates untaxable income. (E) require municipalities or utilities to exhaust every reasonable method of water conservation before applying for permits to construct water supply or water treatment systems; (F) require high-efficiency toilets, urinals, showerheads, and faucets in new construction and changing plumbing codes to incorporate different pipe sizing needs; and (G) and mandate installation of meters to correctly measure water consumption. Following the introduction, a general overview of these recommendations is presented. Each recommendation is discussed briefly. After determining the cost-effectiveness of a plumbing replacement program (or plumbing replacement aspect of a larger program) states can encourage replacement of toilets, urinals, showerheads, and faucets in a number of ways. This report lists both legislative and economic measures that can be implemented on the state level that impact local programs.

  5. 10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

    SciTech Connect (OSTI)

    Noel Duckwtiz

    2011-05-01

    Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

  6. Library of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH

    E-Print Network [OSTI]

    Library of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH b. Submittals. c. Mobilization. d. Changing room trailer. e. Roofing demolition; equipment, containers & fees. f. Roofing

  7. Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL`s existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required.

  8. Replacing Inefficient Equipment - An Engineering Analysis to Justify Purchasing A More Efficient Chiller 

    E-Print Network [OSTI]

    Chen, H.; Deng, S.; Claridge, D. E.; Turner, W. D.; Bensouda, N.

    2005-01-01

    determinate of office building and chiller energy use, is the building schedule and office temperature that is maintained within the space. Thermostat control (day and night settings for cooling and heating within the terminal electronic controller...REPLACING INEFFICIENT EQUIPMENT --- AN ENGINEERING ANALYSIS TO JUSTIFY PURCHASING A MORE EFFICIENT CHILLER Hui Chen, P.E. Project Engineer W. D. Turner, Ph.D., P.E. Professor, Director Song Deng, P.E. Asst. Research Engineer...

  9. A PROTOTYPE FOUR INCH SHORT HYDRIDE (FISH) BED AS A REPLACEMENT TRITIUM STORAGE BED

    SciTech Connect (OSTI)

    Klein, J.; Estochen, E.; Shanahan, K.; Heung, L.

    2011-02-23

    The Savannah River Site (SRS) tritium facilities have used 1st generation (Gen1) metal hydride storage bed assemblies with process vessels (PVs) fabricated from 3 inch nominal pipe size (NPS) pipe to hold up to 12.6 kg of LaNi{sub 4.25}Al{sub 0.75} metal hydride for tritium gas absorption, storage, and desorption for over 15 years. The 2nd generation (Gen2) of the bed design used the same NPS for the PV, but the added internal components produced a bed nominally 1.2 m long, and presented a significant challenge for heater cartridge replacement in a footprint limited glove-box. A prototype 3rd generation (Gen3) metal hydride storage bed has been designed and fabricated as a replacement candidate for the Gen2 storage bed. The prototype Gen3 bed uses a PV pipe diameter of 4 inch NPS so the bed length can be reduced below 0.7 m to facilitate heater cartridge replacement. For the Gen3 prototype bed, modeling results show increased absorption rates when using hydrides with lower absorption pressures. To improve absorption performance compared to the Gen2 beds, a LaNi{sub 4.15}Al{sub 0.85} material was procured and processed to obtain the desired pressure-composition-temperature (PCT) properties. Other bed design improvements are also presented.

  10. phenix.mr_rosetta: a new tool for difficult molecular replacement problems

    SciTech Connect (OSTI)

    Terwilliger, Thomas C [Los Alamos National Laboratory; Read, Randy [UNIV OF CAMBRIDGE; De Maio, Frank [UNIV OF WASHINGTON; Baker, David [UNIV OF WASHINGTON

    2011-01-12

    The PHENIX development team is working with the Baker laboratory at the University of Washington to combine the power of Rosetta structure modeling with PHENIX automated molecular replacement (MR), model-building, density modification, and refinement. The basic idea is to find MR solutions with phenix. automr, rebuild them with Rosetta, including electron density map information, then rebuild those models with phenix. autobuild. The combination of Rosetta rebuilding and phenix rebuilding is the key part of this method. MR solutions are found with phenix. automr (Phaser), scored with LLG (optionally following Rosetta relaxation), the best solutions are picked and rebuilt with Rosetta including map information, the resulting models are scored with Rosetta, and then rescored with LLG, and the top models are rebuilt with phenix. autobuild. It can be very useful for cases where the search model used in molecular replacement is slightly too distant to rebuild successfully with phenix. autobuild. It can also be useful in cases where the model is too distant to even find a molecular replacement solution, and prerefinement with Rosetta can yield an improved search model.

  11. Technology Solutions Case Study: Replacement of Variable-Speed Motors for Furnaces

    SciTech Connect (OSTI)

    2013-02-01

    In conjunction with the New York State Energy Research and Development Authority (NYSERDA) and Proctor Engineering Group, Ltd. (PEG), the Consortium for Advanced Residential Buildings (CARB) evaluated the Concept 3™ replacement motors for residential furnaces in eight homes in Syracuse, NY. These brushless, permanent magnet (BPM) motors can use much less electricity than their PSC (permanent split capacitor) predecessors. This evaluation focuses on existing homes in the heating-dominated climate of upstate New York with the goals of characterizing field performance and cost-effectiveness. The results of this study are intended to be useful to home performance contractors, HVAC contractors, and home efficiency program stakeholders. Tests and monitoring was performed both before and after fan motors were replaced. Average fan power reductions were approximately 126 Watts during heating and 220 Watts during cooling operation. Over the course of entire heating and cooling seasons, these translated into average electric energy savings of 163 kWh, with average cost savings of $20 per year. Homes where the fan was used outside of heating and cooling mode saved an additional $42 per year on average. Results indicate that BPM replacement motors will be most cost-effective in HVAC systems with longer run times and relatively low duct static pressures. More dramatic savings are possible if occupants use the fan-only setting when there is no thermal load.

  12. 10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-05-01

    The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the 50-year-old obsolescent marine diesels with commercial power that is backed with safety related emergency diesel generators, switchgear, and uninterruptible power supply (UPS). The second project, the subject of this major modification determination, will replace the four, obsolete, original primary coolant pumps (PCPs) and motors. Completion of this and the two other age-related projects (replacement of the ATR diesel bus [E-3] and switchgear and replacement of the existent emergency firewater injection system) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification: 1. Evaluation Criteria #3 (Change of existing process). The proposed strategy for equipping the replacement PCPs with VFDs and having the PCPs also function as ECPs will require significant safety basis changes requiring DOE approval. 2. Evaluation Criteria #4 (Use of new technology). The use of VFD and VFD “pump catcher” technology for the PCPs is not currently in use and has not been previously formally reviewed/approved by DOE for ATR. It is noted that VFD technology has several decades of commercial use and experience. However, the ATR probabilistic risk assessment will have to be updated, reflecting the changes for supplying ECP flows including VFD reliability, to confirm that the proposed activity maintains or reduces the CDF for the ATR. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). It is expected that the proposed activity will result in a revised list of safety-related SSCs. Specifically, as currently proposed, the existing ECPs will be deleted from the list. The PCPs and their associated components, picking up the ECP function, will be classified as safety-related active Seismic Category I.

  13. 10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement

    SciTech Connect (OSTI)

    David E. Korns

    2012-05-01

    The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS is a computer support system that acquires analog and digital information from various reactor and reactor support systems. The RDAS information is used to display quadrant and lobe powers via a display interface more user friendly than that provided by the recorders and the Control Room upright panels. RDAS provides input to the Nuclear Engineering ATR Surveillance Data System (ASUDAS) for fuel burn-up analysis and the production of cycle data for experiment sponsors and the generation of the Core Safety Assurance Package (CSAP). RDAS also archives and provides for retrieval of historical plant data which may be used for event reconstruction, data analysis, training and safety analysis. The RDAS, LPCIS and ASUDAS need to be replaced with state-of-the-art technology in order to eliminate problems of aged computer systems, and difficulty in obtaining software upgrades, spare parts, and technical support. The major modification criteria evaluation of the project design did not lead to the conclusion that the project is a major modification. The negative major modification determination is driven by the fact that the project requires a one-for-one equivalent replacement of existing systems that protects and maintains functional and operational requirements as credited in the safety basis.

  14. Buckling of steel cylinders containing circular cutouts reinforced according to the area-replacement method

    SciTech Connect (OSTI)

    Dove, R.C.; Bennett, J.G.; Butler, T.A.

    1982-01-01

    The effect of the use of the area replacement method (ARM) for reinforcing circular penetrations in cylindrical steel shells has been studied both experimentally and analyticaly. How this type of reinforcement affects the buckling strength of a shell subjected to uniform axial compression is the specific area of investigation. In shells that are of such a quality that the penetration reduces the buckling strength, the use of the ARM will increase the bucking strength of the shell. In any case, the conservative knockdown factors suggested for buckling design by the American Society of Mechanical Engineer's (ASME) Boiler and Pressure Vessel Code should ensure an adequate margin to failure under this loading condition.

  15. Lumen Maintenance Testing of the Philips 60-Watt Replacement Lamp L Prize Entry

    SciTech Connect (OSTI)

    Gordon, Kelly L.; Hafen, Ryan P.; Hathaway, John E.; McCullough, Jeffrey J.

    2012-09-01

    This paper describes testing conducted to evaluate the Philips' L Prize award winning 60-watt LED replacement product's ability to meet the lifetime/lumen maintenance requirement of the competition, which was: "having 70 percent of the lumen value under subparagraph (A) [producing a luminous flux greater than 900 lumens] exceeding 25,000 hours under typical conditions expected in residential use." A custom test apparatus was designed and constructed for this testing and a statistical approach was developed for use in evaluating the test results. This will be the only publicly available, third-party data set of long-term LED product operation.

  16. Y-12 replaces ÂŤFort KnoxÂŽ as standard for security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorkingLos Alamos verifies largest single andNuclearsafetyY-12replaces

  17. Study: Algae Could Replace 17% of U.S. Oil Imports | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLEStatutory Authority for anStudy: Algae Could Replace 17% of U.S. Oil

  18. Replace Pressure-Reducing Valves with Backpressure Turbogenerators (International Fact Sheet), Energy Tips-Steam, Steam Tip Sheet #20c

    SciTech Connect (OSTI)

    Not Available

    2010-10-01

    This English/Chinese ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  19. Constructs have shown success in replacement of large-diameter vessels (e.g. thoracic and abdominal aortas,

    E-Print Network [OSTI]

    Sun, Yu

    medium exchange · Develop alterna@ve so\\ware environment to simplify· Constructs have shown success in replacement of large- diameter vessels (e) constructs have shown more failure rates, resul@ng in aneurysm forma

  20. Investigation into the molar feeding ratio and temperature dependence on the replacement reaction between platinum ions and silver nanoparticles

    E-Print Network [OSTI]

    Stuk, Archimedes

    2010-01-01

    The deliberate structuring of bimetallic nanoparticles has useful applications in both fuel cell applications and biomedical research. This thesis studies the replacement reaction between platinum ions and silver nanoparticles, ...

  1. Potential commercial application of a bi-layer bone-ligament regeneration scaffold to anterior cruciate ligament replacement

    E-Print Network [OSTI]

    Li, Jessica C. (Jessica Ching-Yi)

    2006-01-01

    A business model was created in order to explore the commercial application of a bi-layer bone-ligament scaffold to the treatment of torn anterior cruciate ligaments (ACL) requiring replacement. The two main keys in producing ...

  2. ARM: Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Widener, Kevin; Bharadwaj, Nitin; Johnson, Karen

    Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

  3. ARM: Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Karen Johnson; Nitin Bharadwaj

    1990-01-01

    Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

  4. Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    2003-01-01

    Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant John R. C. Robinson Michael C. Popp Texas Water Resources Institute Texas A... and the public. This is anticipated to occur sometime in late 2003 or early 2004. TR-246 October 2003 Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final M...

  5. Should a coal-fired power plant be replaced or retrofitted?

    SciTech Connect (OSTI)

    Dalia Patino-Echeverri; Benoit Morel; Jay Apt; Chao Chen

    2007-12-15

    In a cap-and-trade system, a power plant operator can choose to operate while paying for the necessary emissions allowances, retrofit emissions controls to the plant, or replace the unit with a new plant. Allowance prices are uncertain, as are the timing and stringency of requirements for control of mercury and carbon emissions. We model the evolution of allowance prices for SO{sub 2}, NOx, Hg, and CO{sub 2} using geometric Brownian motion with drift, volatility, and jumps, and use an options-based analysis to find the value of the alternatives. In the absence of a carbon price, only if the owners have a planning horizon longer than 30 years would they replace a conventional coal-fired plant with a high-performance unit such as a supercritical plant; otherwise, they would install SO{sub 2} and NOx controls on the existing unit. An expectation that the CO{sub 2} price will reach $50/t in 2020 makes the installation of an IGCC with carbon capture and sequestration attractive today, even for planning horizons as short as 20 years. A carbon price below $40/t is unlikely to produce investments in carbon capture for electric power. 1 ref., 5 figs., 2 tabs.

  6. Replacing Resistance Heating with Mini-Split Heat Pumps, Sharon, Connecticut (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-05-01

    Mini-split heat pumps can provide space heating and cooling in many climates and are relatively affordable. These and other features make them potentially suitable for retrofitting into multifamily buildings in cold climates to replace electric resistance heating or other outmoded heating systems. This report investigates the suitability of mini-split heat pumps for multifamily retrofits. Various technical and regulatory barriers are discussed and modeling was performed to compare long-term costs of substituting mini-splits for a variety of other heating and cooling options. A number of utility programs have retrofit mini-splits in both single family and multifamily residences. Two such multifamily programs are discussed in detail.

  7. Who can replace Xavi? A passing motif analysis of football players

    E-Print Network [OSTI]

    Peńa, Javier López

    2015-01-01

    Traditionally, most of football statistical and media coverage has been focused almost exclusively on goals and (ocassionally) shots. However, most of the duration of a football game is spent away from the boxes, passing the ball around. The way teams pass the ball around is the most characteristic measurement of what a team's "unique style" is. In the present work we analyse passing sequences at the player level, using the different passing frequencies as a "digital fingerprint" of a player's style. The resulting numbers provide an adequate feature set which can be used in order to construct a measure of similarity between players. Armed with such a similarity tool, one can try to answer the question: Who might possibly replace Xavi at FC Barcelona?

  8. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    SciTech Connect (OSTI)

    Richman, Eric E.

    2009-11-04

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  9. Ligand placement based on prior structures: the guided ligand-replacement method

    SciTech Connect (OSTI)

    Klei, Herbert E. [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); Bristol-Myers Squibb, Princeton, NJ 08543-4000 (United States); Moriarty, Nigel W., E-mail: nwmoriarty@lbl.gov; Echols, Nathaniel [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); Terwilliger, Thomas C. [Los Alamos National Laboratory, Los Alamos, NM 87545-0001 (United States); Baldwin, Eric T. [Bristol-Myers Squibb, Princeton, NJ 08543-4000 (United States); Natural Discovery LLC, Princeton, NJ 08542-0096 (United States); Pokross, Matt; Posy, Shana [Bristol-Myers Squibb, Princeton, NJ 08543-4000 (United States); Adams, Paul D. [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); University of California at Berkeley, Berkeley, CA 94720-1762 (United States)

    2014-01-01

    A new module, Guided Ligand Replacement (GLR), has been developed in Phenix to increase the ease and success rate of ligand placement when prior protein-ligand complexes are available. The process of iterative structure-based drug design involves the X-ray crystal structure determination of upwards of 100 ligands with the same general scaffold (i.e. chemotype) complexed with very similar, if not identical, protein targets. In conjunction with insights from computational models and assays, this collection of crystal structures is analyzed to improve potency, to achieve better selectivity and to reduce liabilities such as absorption, distribution, metabolism, excretion and toxicology. Current methods for modeling ligands into electron-density maps typically do not utilize information on how similar ligands bound in related structures. Even if the electron density is of sufficient quality and resolution to allow de novo placement, the process can take considerable time as the size, complexity and torsional degrees of freedom of the ligands increase. A new module, Guided Ligand Replacement (GLR), was developed in Phenix to increase the ease and success rate of ligand placement when prior protein–ligand complexes are available. At the heart of GLR is an algorithm based on graph theory that associates atoms in the target ligand with analogous atoms in the reference ligand. Based on this correspondence, a set of coordinates is generated for the target ligand. GLR is especially useful in two situations: (i) modeling a series of large, flexible, complicated or macrocyclic ligands in successive structures and (ii) modeling ligands as part of a refinement pipeline that can automatically select a reference structure. Even in those cases for which no reference structure is available, if there are multiple copies of the bound ligand per asymmetric unit GLR offers an efficient way to complete the model after the first ligand has been placed. In all of these applications, GLR leverages prior knowledge from earlier structures to facilitate ligand placement in the current structure.

  10. Calculation of dose rates during replacement of the 3CL seal tube in the FFTF IEM cell

    SciTech Connect (OSTI)

    Nelson, J.V.

    1997-11-12

    In September 1996, the seal tube at the 3CL window of the Interim Examination and Maintenance (IEM) Cell at the Fast Flux Test Facility (FFTF) failed. Replacement of the seal tube required removing the 3CL master slave manipulator (MSM) and shielding creating a streaming path for radiation from irradiated fuel and activated hardware in the IEM Cell. As a part of the preparation for the seal tube replacement, expected dose rates in the IEM Cell gallery outside the open 3CL penetration during the repair work were evaluated.

  11. An optimal state-age replacement policy for a semi-Markov deterioration process / by Tilden Newton Mike 

    E-Print Network [OSTI]

    Mikel, Tilden Newton

    1977-01-01

    To illustrate the solution procedures for Kao's State-Age Dependent Policy and the Optimal State-Age Replacement Policy presented in Section 4, an example is given with the following parameters: The state space E is (0, 1, 2, 3 ). The replacement costs are.... 0 1. 0 The state holding time probabilities, h(i, t), are: h(0, 0) = 0. 0, h(0, 1) = 0. 1, h(0, 2) = 0. 18, h(0, 3) = 0. 216, h(0, 4) = 0. 454, h(0, 5) = 0. 050, H(0, 5) = 1. 0, h(1, 0) = 0. 0, h(1, 1) = 0. 2, h(1, 2) = 0. 14, h(1, 3) = 0. 528...

  12. Replacement of chlorofluorocarbons at the DOE gaseous diffusion plants: An assessment of global impacts

    SciTech Connect (OSTI)

    Socolof, M.L.; McCold, L.N.; Saylor, R.E.

    1997-01-01

    Three gaseous diffusion plants (GDPs) for enriching uranium maintain a large inventory of chlorofluorocarbon-114 (CFC-114) as a coolant. To address the continued use of CFC-114, an ozone-depleting substance, the US Department of Energy (DOE) considered introducing perfluorocarbons (PFCs) by the end of 1995. These PFCs would not contribute to stratospheric ozone depletion but would be larger contributors to global warming than would CFC-114. The paper reports the results of an assessment of the global impacts of four alternatives for modifying GDP coolant system operations over a three-year period beginning in 1996. The overall contribution of GDP coolant releases to impacts on ozone depletion and global warming were quantified by parameters referred to as ozone-depletion impact and global-warming impact. The analysis showed that these parameters could be used as surrogates for predicting global impacts to all resources and could provide a framework for assessing environmental impacts of a permanent coolant replacement, eliminating the need for subsequent resource-specific analyses.

  13. Concentrated solar thermal (cst) system for fuelwood replacement and for household water sanitation in developing countries.

    SciTech Connect (OSTI)

    Akinjiola, O. P.; Balachandran, U. (Energy Systems); (Rsage Research, LLC)

    2012-01-01

    Concentrated Solar Thermal (CST) is a proven renewable energy technology that harnesses solar irradiation in its most primitive form. This technology with roots in ancient history is growing at a fast pace in recent times. Developing countries could use CST to solve fundamental human-needs challenges, such as for the substitution of fuelwood and the treatment of water for household use. This paper proposes a conceptual design for a standardized modular CST for these applications in developing countries. A modular-designed parabolic CST with an aperture area of 7.5 m2 is adequate to provide enough solar thermal energy to replace the fuelwood need (5 tons/yr) or to pasteurize the minimum daily water requirement (2500 liters) for a household. Critical parameters of the CST are discussed and an affordable solid thermal storage is recommended to be used as a backup when sunlight is unavailable. A funding program that includes in-country resources and external funding will be needed to sustain the development and wide spread adaptation of this technology.

  14. Replacement of Lighting Fixtures with LED Energy Efficient Lights at the Parking Facility, Milwaukee, Wisconsin

    SciTech Connect (OSTI)

    David Brien

    2012-06-21

    The Forest County Potawatomi Community (FCPC or Tribe) owns a six-story parking facility adjacent to its Potawatomi Bingo Casino (the Casino) in Milwaukee, Wisconsin, as well as a valet parking facility under the Casino (collectively, the Parking Facility). The Parking Facility contained 205-watt metal halide-type lights that, for security reasons, operated 24 hours per day, 7 days per week. Starting on August 30, 2010, the Tribe replaced these fixtures with 1,760 state-of-the-art, energy efficient 55-Watt LED lights. This project resulted in an immediate average reduction in monthly peak demand of 238 kW over the fourth quarter of 2010. The average reduction in monthly peak demand from October 1 through December 31, 2010 translates into a forecast annual electrical energy reduction of approximately 1,995,000 kWh or 47.3% of the pre-project demand. This project was technically effective, economically feasible, and beneficial to the public not only in terms of long term energy efficiency and associated emissions reductions, but also in the short-term jobs provided for the S.E. Wisconsin region. The project was implemented, from approval by U.S. Department of Energy (DOE) to completion, in less than 6 months. The project utilized off-the-shelf proven technologies that were fabricated locally and installed by local trade contractors.

  15. Methods for disassembling, replacing and assembling parts of a steam cooling system for a gas turbine

    DOE Patents [OSTI]

    Wilson, Ian D. (Mauldin, SC); Wesorick, Ronald R. (Albany, NY)

    2002-01-01

    The steam cooling circuit for a gas turbine includes a bore tube assembly supplying steam to circumferentially spaced radial tubes coupled to supply elbows for transitioning the radial steam flow in an axial direction along steam supply tubes adjacent the rim of the rotor. The supply tubes supply steam to circumferentially spaced manifold segments located on the aft side of the 1-2 spacer for supplying steam to the buckets of the first and second stages. Spent return steam from these buckets flows to a plurality of circumferentially spaced return manifold segments disposed on the forward face of the 1-2 spacer. Crossover tubes couple the steam supply from the steam supply manifold segments through the 1-2 spacer to the buckets of the first stage. Crossover tubes through the 1-2 spacer also return steam from the buckets of the second stage to the return manifold segments. Axially extending return tubes convey spent cooling steam from the return manifold segments to radial tubes via return elbows. The bore tube assembly, radial tubes, elbows, manifold segments and crossover tubes are removable from the turbine rotor and replaceable.

  16. Building America Case Study: Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-11-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  17. Technology Solutions Case Study: Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts

    SciTech Connect (OSTI)

    2014-11-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency, which faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68°F) than day (73° F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  18. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings: Boiler Control Replacement and Monitoring

    SciTech Connect (OSTI)

    Dentz, J.; Henderson, H.; Varshney, K.

    2014-09-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  19. Use of Brazilian sugarcane bagasse ash in concrete as sand replacement

    SciTech Connect (OSTI)

    Sales, Almir; Lima, Sofia Araujo

    2010-06-15

    Sugarcane today plays a major role in the worldwide economy, and Brazil is the leading producer of sugar and alcohol, which are important international commodities. The production process generates bagasse as a waste, which is used as fuel to stoke boilers that produce steam for electricity cogeneration. The final product of this burning is residual sugarcane bagasse ash (SBA), which is normally used as fertilizer in sugarcane plantations. Ash stands out among agroindustrial wastes because it results from energy generating processes. Many types of ash do not have hydraulic or pozzolanic reactivity, but can be used in civil construction as inert materials. The present study used ash collected from four sugar mills in the region of Sao Carlos, SP, Brazil, which is one of the world's largest producers of sugarcane. The ash samples were subjected to chemical characterization, sieve analysis, determination of specific gravity, X-ray diffraction, scanning electron microscopy, and solubilization and leaching tests. Mortars and concretes with SBA as sand replacement were produced and tests were carried out: compressive strength, tensile strength and elastic modulus. The results indicated that the SBA samples presented physical properties similar to those of natural sand. Several heavy metals were found in the SBA samples, indicating the need to restrict its use as a fertilizer. The mortars produced with SBA in place of sand showed better mechanical results than the reference samples. SBA can be used as a partial substitute of sand in concretes made with cement slag-modified Portland cement.

  20. Inspector General audit report on Transportation Safeguards Division courier work schedules and escort vehicle replacements

    SciTech Connect (OSTI)

    NONE

    1998-12-01

    The Office of Inspector General`s (OIG) April 1995 report found that couriers received too much overtime and incurred too much unproductive time. This finding occurred because the Transportation Safeguards Division (TSD) employed a traditional work schedule that did not meet the demands of the job. The report recommended implementing an alternative work schedule that corresponded more closely to the couriers` actual work requirements. Management agreed to conduct a comparative analysis of work schedules to evaluate potential savings. The objectives of this audit were to (1) follow up on actions taken as a result of the OIG`s previous report, (2) determine if courier work schedules are cost effective, and (3) determine the cost effectiveness of escort vehicle replacements. The authors recommend: (1) implementing an alternative work schedule for courier which would achieve savings in overtime and unproductive time, while efficiently and cost effectively fulfilling TSD`s mission; (2) reexamining and adjusting the staffing level of each courier section in relation to the workload requirements in the area; and (3) discontinuing payment for travel time between courier lodging and temporary duty stations. The Albuquerque Operations Office agreed with the auditor`s findings and recommendations.

  1. Formation of Pd/Au Nanostructures from Pd Nanowires via Galvanic Replacement Reaction

    SciTech Connect (OSTI)

    Teng,X.; Wang, Q.; Liu, P.; Han, W.; Frenkel, A.; Wen, W.; Marinkovic, N.; Hanson, J.; Rodriguez, J.

    2008-01-01

    Bimetallic nanostructures with non-random metal atoms distribution are very important for various applications. To synthesize such structures via benign wet chemistry approach remains challenging. This paper reports a synthesis of a Au/Pd alloy nanostructure through the galvanic replacement reaction between Pd ultrathin nanowires (2.4 {+-} 0.2 nm in width, over 30 nm in length) and AuCl3 in toluene. Both morphological and structural changes were monitored during the reaction up to 10 h. Continuous changes of chemical composition and crystalline structure from Pd nanowires to Pd68Au32 and Pd45Au55 alloys, and to Au nanoparticles were observed. More interestingly, by using combined techniques such as high-resolution transmission electron microscopy (HRTEM), X-ray diffraction (XRD), energy dispersive X-ray spectrometry (EDS), UV-vis absorption, and extended X-ray absorption fine structure (EXAFS) spectroscopy, we found the formation of Pd68Au32 non-random alloy with Au-rich core and Pd-rich shell, and random Pd45Au55 alloy with uniformly mixed Pd and Au atom inside the nanoparticles, respectively. Density functional theory (DFT) calculations indicated that alkylamine will strongly stabilize Pd to the surface, resulting in diffusion of Au atoms into the core region to form a non-random alloy. We believe such benign synthetic techniques can also enable the large scale preparation of various types of non-random alloys for several technically important catalysis applications.

  2. Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  3. Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  4. Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  5. Library of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH

    E-Print Network [OSTI]

    Library of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH-control services not specified in other sections, including the following: 1. Infrared Roof Moisture Survey 2. Alternate Roof Moisture Survey 3. Roof Drain Testing 4. Rooftop Equipment Survey/Testing 1.3 INFRARED ROOF

  6. Bridgeton Research Center Roof Replacement and Related Work December 4, 2000 DSR # 0029-99 C/D

    E-Print Network [OSTI]

    Bridgeton Research Center Roof Replacement and Related Work December 4, 2000 DSR # 0029-99 C/D SECTION 07220 ­ ROOF INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions: contains requirements for wood blocking to be installed prior to roof insulation. 1. Roof insulation

  7. On-Demand Node Reclamation and Replacement for Guaranteed Area Coverage in Long-lived Sensor Networks

    E-Print Network [OSTI]

    Zhang, Wensheng

    applica- tion in long-term tasks such as structural health monitoring for bridges and tunnels, border and efficient way to guarantee long-term energy supply has persisted as a big challenge. Recently, Tong et alOn-Demand Node Reclamation and Replacement for Guaranteed Area Coverage in Long-lived Sensor

  8. Data Protection The Data Protection Act 1984 has now been replaced by the Data Protection Act 1998,

    E-Print Network [OSTI]

    Data Protection The Data Protection Act 1984 has now been replaced by the Data Protection Act 1998, which is based on the European Data Protection Directive. The 1998 Act applies to both manual for privacy and access by individuals. Information on how to make a request for access to personal data under

  9. Re-Placing Faith: Reconsidering the Secular-Religious Use Divide in the United States and Kenya

    E-Print Network [OSTI]

    Aoki, Paul M.

    Re-Placing Faith: Reconsidering the Secular-Religious Use Divide in the United States and Kenya in urban centers in the United States and Kenya. The contributions of this work for the CHI/CSCW community countries, including key "emerging markets" such as Brazil, Nigeria and Kenya, the recent growth

  10. IEEE TRANSACTIONS ON WIRELESS COMMUNICATIONS, VOL. 8, NO. 6, JUNE 2009 2819 Replacement of Spectrum Sensing in Cognitive Radio

    E-Print Network [OSTI]

    Jiang, Hai

    IEEE TRANSACTIONS ON WIRELESS COMMUNICATIONS, VOL. 8, NO. 6, JUNE 2009 2819 Replacement of Spectrum IN the next generation wireless networks, the frequency spectrum will become one of the most precious resources, and is expected to become congested to accommodate the increasing demand on wireless multimedia

  11. [Minor revision--posted 10/22/12 (replaces12/22/10 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    OP 30.05 [Minor revision--posted 10/22/12 (replaces12/22/10 edition)] Operating Policy as non-credit workshops, institutes, seminars, certificate programs, clinics, or other special training activities (hereafter referred to as non-credit programming) sponsored by Texas Tech University for which

  12. PB-LRU: A Self-Tuning Power Aware Storage Cache Replacement Algorithm for Conserving Disk Energy

    E-Print Network [OSTI]

    Zhou, Yuanyuan

    PB-LRU: A Self-Tuning Power Aware Storage Cache Replacement Algorithm for Conserving Disk Energy is an important concern at data centers, where storage systems consume a significant fraction of the total energy of a data center, storage is one of the biggest energy consumers, consuming almost 27% of the total [1

  13. Simulation Analyses in Support of DOE’s Fossil Fuel Rule for Single Component Equipment and Lighting Replacements

    SciTech Connect (OSTI)

    Halverson, Mark A.; Wang, Weimin

    2013-10-16

    At the request of DOE’s Federal Energy Management Program (FEMP), Pacific Northwest National Laboratory (PNNL) conducted a series of building energy simulations using a large office model to investigate the potential savings that could be accrued from a typical chiller, boiler, or lighting replacement in a Federal office building.

  14. The Effects of Metaphylaxis and Milk Replacer Additives on Health and Growth of Neonatal Holstein Bull Calves 

    E-Print Network [OSTI]

    Dehaan, Katherine G.

    2010-07-14

    A study evaluating the effects of metaphylaxis antibiotics and milk replacer additives on the health and development of Holstein bull calves (n=52; mean body weight=42.28 kg + 3 kg; starting age <3 days) was conducted. The calves were placed into a...

  15. The Effects of Metaphylaxis and Milk Replacer Additives on Health and Growth of Neonatal Holstein Bull Calves. 

    E-Print Network [OSTI]

    Holloway, Kenton S.

    2010-07-14

    A study evaluating effects of metaphylaxis and milk replacer additives on health and growth was conducted with Holstein bull calves (n = 52; mean BW = 42.28 +- 3 kg) < 7 d of age. Calves were randomly assigned to receive tilmicosin phosphate (TIL...

  16. Proposal to negotiate the renewal of an existing blanket purchase contract for the repair, reconditioning or replacement of klystrons for CTF3 and associated accessories

    E-Print Network [OSTI]

    2012-01-01

    Proposal to negotiate the renewal of an existing blanket purchase contract for the repair, reconditioning or replacement of klystrons for CTF3 and associated accessories

  17. Design Tools to Assess Hydro-Turbine Biological Performance: Priest Rapids Dam Turbine Replacement Project

    SciTech Connect (OSTI)

    Richmond, Marshall C.; Rakowski, Cynthia L.; Serkowski, John A.; Strickler, Brad; Weisbeck, Molly; Dotson, Curtis L.

    2013-06-25

    Over the past two decades, there have been many studies describing injury mechanisms associated with turbine passage, the response of various fish species to these mechanisms, and the probability of survival through dams. Although developing tools to design turbines that improve passage survival has been difficult and slow, a more robust quantification of the turbine environment has emerged through integrating physical model data, fish survival data, and computational fluid dynamics (CFD) studies. Grant County Public Utility District (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now almost 50 years old. The Utility District plans to refit all of these aging turbines with new turbines. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when replacing the turbines. In this presentation, a method for turbine biological performance assessment (BioPA) is introduced. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We will present application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

  18. Project Plan 7930 Cell G PaR Remote Handling System Replacement

    SciTech Connect (OSTI)

    Kinney, Kathryn A

    2009-10-01

    For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and reliable Par manipulator arm is necessary for uninterrupted {sup 252}Cf operations; a fully-functioning bridge is needed for the system to function as intended.

  19. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  20. Advanced Pipe Replacement Procedure for a Defective CRDM Housing Nozzle Enables Continued Normal Operation of a Nuclear Power Plant

    SciTech Connect (OSTI)

    Gilmore, Geoff; Becker, Andrew [Climax Portable Machine Tools, Inc., 2712 East Second Street, Newberg, OR 97132 (United States)

    2006-07-01

    During the 2003 outage at the Ringhals Nuclear Plant in Sweden, a leak was found in the vicinity of a Control Rod Drive Mechanism (CRDM) housing nozzle at Unit 1. Based on the ALARA principle for radioactive contamination, a unique repair process was developed. The repair system includes utilization of custom, remotely controlled GTAW-robots, a CNC cutting and finishing machine, snake-arm robots and NDE equipment. The success of the repair solution was based on performing the machining and welding operations from the inside of the SCRAM pipe through the CRDM housing since accessibility from the outside was extremely limited. Before the actual pipe replacement procedure was performed, comprehensive training programs were conducted. Training was followed by certification of equipment, staff and procedures during qualification tests in a full scale mock-up of the housing nozzle. Due to the ingenuity of the overall repair solution and training programs, the actual pipe replacement procedure was completed in less than half the anticipated time. As a result of the successful pipe replacement, the nuclear power plant was returned to normal operation. (authors)

  1. New plastic circuits could replace paper -(United Press Inte... http://washingtontimes.com/upi-breaking/20040311-084413... 1 of 4 3/15/2004 8:55 PM

    E-Print Network [OSTI]

    Rogers, John A.

    New plastic circuits could replace paper - (United Press Inte... http plastic circuits could replace paper By Charles Choi United Press International NEW YORK, March 11 (UPI) -- Scientists at Lucent Technologies and an academic institution have created the highest performance plastic

  2. Text-Alternative Version: The L Prize-Winning LED A19 Replacement—What Commercial Building Owners/Operators Can Expect in 2012

    Broader source: Energy.gov [DOE]

    Below is the text-alternative version of the "The L Prize-Winning LED A19 Replacement—What Commercial Building Owners/Operators Can Expect in 2012" webcast, held January 18, 2012.

  3. 1. Those whom studied the most had the highest scores on the final exam. A. "Whom" should be replaced with "who."

    E-Print Network [OSTI]

    Rock, Chris

    in agriculture is the best weapons against hunger and poverty." A. "Investments" should be replaced with "investing." B. The comma after "poverty" should go on the outside of the quotation mark. C. "Weapons" should

  4. The use of petroleum for liquid-transportation fuels has strained the environment and caused the global crude oil reserves to diminish. Therefore, there exists a need to replace petroleum as the primary fuel

    E-Print Network [OSTI]

    the global crude oil reserves to diminish. Therefore, there exists a need to replace petroleum as the primary

  5. As Complementary MetalOxideSemiconductor (CMOS) transistors begin to face significant scaling challenges, work has started in earnest to explore new devices that can poten ally replace CMOS. Spintronic devices, u lizing the spin of elec

    E-Print Network [OSTI]

    DeMara, Ronald F.

    challenges, work has started in earnest to explore new devices that can poten ally replace CMOS. Spintronic

  6. Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) – 48" Pipeline Replacing Wisconsin Canal – Preliminary 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    2003-01-01

    Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) – 48" Pipeline Replacing Wisconsin Canal – Preliminary M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant John R. C. Robinson Michael C. Popp Texas Water... Resources Institute Texas A&M University TR-220 May 2003 Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) – 48" Pipeline Replacing Wisconsin Canal – Preliminary M. Edward Rister Ronald...

  7. New York Power Authority/New York City Housing Authority refrigerator replacement program, first program year evaluation. Final report

    SciTech Connect (OSTI)

    Kinney, L.F.; Lewis, G.; Pratt, R.G.; Miller, J.

    1997-08-01

    Acting as an energy services provider, the New York Power Authority (NYPA) has initiated a long-term project through which 20,000 refrigerators per year will be replaced with the most energy-efficient units possible in apartments managed by the New York City Housing Authority (NYCHA). Using bulk purchasing as an incentive to appliance manufacturers to produce energy-efficient refrigerators suitable for use in apartments, replaced in the first year of the program, which ended in December 1996. These units, kWh per year. Savings were determined by field testing and laboratory testing of 220 existing refrigerators and 56 newly-installed units. In the next program year, a 15.0-cubic-foot Maytag refrigerator, newly-designed in response to bulk purchasing incentives, is being installed. The new unit has a label rating of 437 kWh per year, 31 percent better than 1993 energy standards. Old refrigerators removed from apartments are {open_quotes}demanufactured{close_quotes} in an environmentally-appropriate way and both metals and refrigerants are recovered for reuse.

  8. Comprehensive Pyrometry of Incandescent Multiwalled Carbon Nanotubes and Graphene in the Visible and Near Infrared

    E-Print Network [OSTI]

    Singer, Scott

    2012-01-01

    chip’s membrane backlit by lightbulb using 500 nm ?lter. Inconnection. A small lightbulb is placed in the backside ofchip’s membrane backlit by lightbulb using 500 nm ?lter. In

  9. Comprehensive Pyrometry of Incandescent Multiwalled Carbon Nanotubes and Graphene in the Visible and Near Infrared

    E-Print Network [OSTI]

    Singer, Scott

    2012-01-01

    Systems Nanofabrication Cleanroom (ISNC) in the Californiawafer. Place the wafer on cleanroom paper and, using a Q-lifto?, place the wafer on a cleanroom paper towel and use a

  10. High Spatial Resolution Laser Cavity Extinction and Laser Induced Incandescence in Low Soot Producing Flames

    E-Print Network [OSTI]

    Tian, B.; Gao, Y.; Balusamy, S.; Hochgreb, S.

    2015-06-26

    1 Introduction Soot particles generated from combustion are both a significant atmo- spheric pollutant, as well as a contributor to climate change [1–4]. Many techniques have therefore been developed to measure soot particles from a variety... ,34] is that the present technique does not rely on pulsed, shot-to-shot measurements, but rather a low power, low cost CW laser. This allows for a much simpler, less expensive system, which does not require a fast response detector and signal receiver capable of nanosec...

  11. Aerosol Mass Spectrometry via Laser-Induced Incandescence Particle Vaporization Final Report

    SciTech Connect (OSTI)

    Timothy B. Onasch

    2011-10-20

    We have successfully developed and commercialized a soot particle aerosol mass spectrometer (SP-AMS) instrument to measure mass, size, and chemical information of soot particles in ambient environments. The SP-AMS instrument has been calibrated and extensively tested in the laboratory and during initial field studies. The first instrument paper describing the SP-AMS has been submitted for publication in a peer reviewed journal and there are several related papers covering initial field studies and laboratory studies that are in preparation. We have currently sold 5 SP-AMS instruments (either as complete systems or as SP modules to existing AMS instrument operators).

  12. Comprehensive Pyrometry of Incandescent Multiwalled Carbon Nanotubes and Graphene in the Visible and Near Infrared

    E-Print Network [OSTI]

    Singer, Scott

    2012-01-01

    Graphene As graphene is a zero-gap semiconductor, transportsemiconductor technology. The performance of grapheneGraphene, an atomically thin sheet of sp 2 bonded carbon, is a zero-bandgap semiconductor

  13. Conceptual Design for Replacement of the DTL and CCL with Superconducting RF Cavities in the Spallation Neutron Source Linac

    SciTech Connect (OSTI)

    Champion, Mark S; Doleans, Marc; Kim, Sang-Ho

    2013-01-01

    The Spallation Neutron Source Linac utilizes normal conducting RF cavities in the low energy section from 2.5 MeV to 186 MeV. Six Drift Tube Linac (DTL) structures accelerate the beam to 87 MeV, and four Coupled Cavity Linac (CCL) structures provide further acceleration to 186 MeV. The remainder of the Linac is comprised of 81 superconducting cavities packaged in 23 cryomodules to provide final beam energy of approximately 1 GeV. The superconducting Linac has proven to be substantially more reliable than the normal conducting Linac despite the greater number of stations and the complexity associated with the cryogenic plant and distribution. A conceptual design has been initiated on a replacement of the DTL and CCL with superconducting RF cavities. The motivation, constraints, and conceptual design are presented.

  14. Replacing Valuable Papers. 

    E-Print Network [OSTI]

    Anoymous,

    1982-01-01

    credit cards, contact a bank or service station which handles new applications for the cor rect address. Birth certificates For births in Texas: Bureau of Vital Statistics; Texas Department of Health Resources; Austin, Texas 78701; (512... or Naturalization Papers. Cost is $5 and new photo. Credit cards As soon as possible, notify the company that the card is missing, to avoid any charges from someone else using it. Death certificates Contact the clerk's office in the county where the person...

  15. Normetex Pump Replacement

    Broader source: Energy.gov [DOE]

    Presentation from the 32nd Tritium Focus Group Meeting held in Germantown, Maryland on April 23-25, 2013.

  16. First SNS Target Replacement

    E-Print Network [OSTI]

    McDonald, Kirk

    ) used to drain the mercury to a shielded storage tank is the only active element. · However, the process · A shielded "Target Service Bay" located downstream of the target-proton beam interaction monolith serves

  17. Centrifuges Replacement Study Proposal

    E-Print Network [OSTI]

    Iqbal, Muhammad

    2005-12-16

    , the first being the Zippe-type, are used to separate isotopes, and these kinds of centrifuges are in use in nuclear power and nuclear weapon programs. Uranium- 235, which is found in nature mixed with uranium-238, must be separated to be used to produce... installed at ?ABC? manufacturing plant Figure 4 - Pictorial view of a Peeler type Centrifuge from Krauss-Maffei Process Technology Figure 5 - Picture of a Centrifuge from Bird Machine Co Figure 6 - Picture of a skid mounted Centrifuge from Flo Trend...

  18. Replacing Lightbulbs and Ballasts

    Broader source: Energy.gov [DOE]

    Buy new fixtures made for new lightbulbs for the greatest energy savings, reliability, and longevity.

  19. Spacer Damper Replacement Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effect Photovoltaics -7541C. TemperatureThousand

  20. Filter Replacement Activities Complete

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journal Article) | SciTechSubmittedEcologist forInformationJoint4, 2014

  1. Supplement A. The relationship of the proportion of populations that replaced themselves from year t-1 to year t with the respective population density in year t-1 (top graph)

    E-Print Network [OSTI]

    Supplement A. The relationship of the proportion of populations that replaced themselves from year as the abundance (in t-1) at which the replacement proportion decreased and dropped below 0.5. These data were PopulationReplacementProportion(Yeart) 0.0 0.2 0.4 0.6 0.8 1.0 0 100 200 300 400 500 600 700 0 0.1 0.2 0.3 0

  2. Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana

    SciTech Connect (OSTI)

    N /A

    2004-08-31

    The proposed action and three alternatives, including a No Build alternative, were evaluated along the existing RWIPL alignment to accommodate the placement of the proposed RWIPL. Construction feasibility, reasonableness and potential environmental impacts were considered during the evaluation of the four actions (and action alternatives) for the proposed RWIPL activities. Reasonable actions were identified as those actions which were considered to be supported by common sense and sound technical principles. Feasible actions were those actions which were considered to be capable of being accomplished, practicable and non-excessive in terms of cost. The evaluation process considered the following design specifications, which were determined to be important to the feasibility of the overall project. The proposed RWIPL replacement project must therefore: (1) Comply with the existing design basis and criteria, (2) Maintain continuity of operation of the facility during construction, (3)Provide the required service life, (4) Be cost effective, (5)Improve the operation and maintenance of the pipeline, and (6) Maintain minimal environmental impact while meeting the performance requirements. Sizing of the pipe, piping construction materials, construction method (e.g., open-cut trench, directional drilling, etc.) and the acquisition of new Right-of-Way (ROW) were additionally evaluated in the preliminary alternative identification, selection and screening process.

  3. Environmental assessment of the brine pipeline replacement for the Strategic Petroleum Reserve Bryan Mound Facility in Brazoria County, Texas

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0804, for the proposed replacement of a deteriorated brine disposal pipeline from the Strategic Petroleum Reserve (SPR) Bryan Mound storage facility in Brazoria County, Texas, into the Gulf of Mexico. In addition, the ocean discharge outfall would be moved shoreward by locating the brine diffuser at the end of the pipeline 3.5 miles offshore at a minimum depth of 30 feet. The action would occur in a floodplain and wetlands; therefore, a floodplain/wetlands assessment has been prepared in conjunction with this EA. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 USC. 4321, et seg.). Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and the Department is issuing this Finding of No Significant Impact (FONSI). This FONSI also includes a Floodplain Statement of Findings in accordance with 10 CFR Part 1022.

  4. > REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) Low-Cost Sensor System for Alarm Reporting

    E-Print Network [OSTI]

    Idaho, University of

    could monitor and report any type of data of interest to us, such as oil pipeline pressure, gas flow> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) Low and microcontrollers are leveraged upon in providing low-cost automated event reporting and metering data in utility

  5. Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed chemical processing systems at Building 9212, Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1995-09-01

    The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is located within the Y-12 Plant on DOE`s Oak Ridge Reservation in Oak Ridge, Tennessee. The proposed replacement system would be based upon modern design criteria and safety analyses. The replacement AHF supply and distribution system equipment would be located on the existing Dock 8/8A at Building 9212. Utilities would be extended to the dock to service the process equipment. The following process equipment modules would be prefabricated for installation at the modified dock: an AHF cylinder enclosure, an AHF supply manifold and vaporizer module, an AHF sump tank and transfer skid, and an AHF supply off-gas scrubber assembly module. The fluidized-bed reactor system would be constructed in an area adjacent to the existing system in Building 9212. The replacement equipment would consist of a new reduction fluidized-bed reactor, a hydrofluorination fluidized-bed reactor, and associated air emission control equipment. The no-action alternative, which is the continued operation of the existing AHF supply and fluidized-bed reactor systems, was also evaluated.

  6. Replacement, Variable-Speed Motors for Furnaces, Syracuse, New York (Fact Sheet), Building America Case Study: Technology Solutions for New and Existing Homes, Building Technologies Office (BTO)

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudgetFinancialReliabilityEnergyRenewableEnergy:Replacement

  7. Performance of T12 and T8 Fluorescent Lamps and Troffers and LED Linear Replacement Lamps CALiPER Benchmark Report

    SciTech Connect (OSTI)

    Myer, Michael; Paget, Maria L.; Lingard, Robert D.

    2009-01-16

    The Department of Energy (DOE) Commercially Available LED Product Evaluation and Reporting (CALiPER) Program was established in 2006 to investigate the performance of light-emitting diode (LED) based luminaires and replacement lamps. To help users better compare LED products with conventional lighting technologies, CALiPER has also performed benchmark research and testing of traditional (i.e., non-LED) lamps and fixtures. This benchmark report addresses standard 4-foot fluorescent lamps (i.e., T12 and T8) and the 2-foot by 4-foot recessed troffers in which they are commonly used. This report also examines available LED replacements for T12 and T8 fluorescent lamps, and their application in fluorescent troffers. The construction and operation of linear fluorescent lamps and troffers are discussed, as well as fluorescent lamp and fixture performance, based on manufacturer data and CALiPER benchmark testing. In addition, the report describes LED replacements for linear fluorescent lamps, and compares their bare lamp and in situ performance with fluorescent benchmarks on a range of standard lighting measures, including power usage, light output and distribution, efficacy, correlated color temperature, and the color rendering index. Potential performance and application issues indicated by CALiPER testing results are also examined.

  8. Alternatives to diesel fuel in California - fuel cycle energy and emission effects of possible replacements due to the TAC diesel particulate decision.

    SciTech Connect (OSTI)

    Saricks, C. L.; Rote, D. M.; Stodolsky, F.; Eberhardt, J. J.

    1999-12-03

    Limitations on petroleum-based diesel fuel in California could occur pursuant to the 1998 declaration by California's Air Resources Board (CARB) that the particulate matter component of diesel exhaust is a carcinogen, therefore a toxic air contaminant (TAC) subject to the state's Proposition 65. It is the declared intention of CARB not to ban or restrict diesel fuel per se, at this time. Assuming no total ban, Argonne National Laboratory (ANL) explored two feasible mid-course strategies, each of which results in some degree of (conventional) diesel displacement. In the first case, with substantial displacement of compression-ignition by spark-ignition engines, diesel fuel is assumed admissible for ignition assistance as a pilot fuel in natural gas (NG)-powered heavy-duty vehicles. Gasoline demand in California increases by 32.2 million liters (8.5 million gallons) per day overall, about 21% above projected 2010 baseline demand. Natural gas demand increases by 13.6 million diesel liter (3.6 million gallon) equivalents per day, about 7% above projected (total) consumption level. In the second case, compression-ignition engines utilize substitutes for petroleum-based diesel having similar ignition and performance properties. For each case the authors estimated localized air emission plus generalized greenhouse gas and energy changes. Fuel replacement by di-methyl ether yields the greatest overall reduction in NOX emissions, though all scenarios bring about PM{sub 10} reductions relative to the 2010 baseline, with greatest reductions from the first case described above and the least from fuel replacement by Fischer-Tropsch synthetic diesel. Economic implications of vehicle and engine replacement were not formally evaluated.

  9. Alternatives to Diesel Fuel in California - Fuel Cycle Energy and Emission Effects of Possible Replacements Due to the TAC Diesel Particulate Decision

    SciTech Connect (OSTI)

    Christopher L. Saraicks; Donald M. Rote; Frank Stodolsky; James J. Eberhardt

    2000-05-01

    Limitations on petroleum-based diesel fuel in California could occur pursuant to the 1998 declaration by California's Air Resources Board (CARB) that the particulate matter component of diesel exhaust is a carcinogen, therefore a toxic air contaminant (TAC) subject to the state's Proposition 65. It is the declared intention of CARB not to ban or restrict diesel fuel, per se, at this time. Assuming no total ban, Argonne National Laboratory (ANL) explored two feasible ''mid-course'' strategies, each of which results in some degree of (conventional) diesel displacement. In the first case, with substantial displacement of compression ignition by spark ignition engines, diesel fuel is assumed admissible for ignition assistance as a pilot fuel in natural gas (NG)-powered heavy-duty vehicles. Gasoline demand in California increases by 32.2 million liters (8.5 million gallons) per day overall, about 21 percent above projected 2010 baseline demand. Natural gas demand increases by 13.6 million diesel liter (3.6 million gallon) equivalents per day, about 7 percent above projected (total) consumption level. In the second case, ressionignition engines utilize substitutes for petroleum-based diesel having similar ignition and performance properties. For each case we estimated localized air emission plus generalized greenhouse gas and energy changes. Fuel replacement by di-methyl ether yields the greatest overall reduction in NOx emissions, though all scenarios bring about PM10 reductions relative to the 2010 baseline, with greatest reductions from the first case described above and the least from fuel replacement by Fischer-Tropsch synthetic diesel. Economic implications of vehicle and engine replacement were not formally evaluated.

  10. Trial Protocol: Using genotype to tailor prescribing of nicotine replacement therapy: a randomised controlled trial assessing impact of communication upon adherence

    E-Print Network [OSTI]

    Marteau, Theresa M.; Munafo, Marcus R.; Aveyard, Paul; Hill, Chloe; Whitwell, Sophia C. L.; Willis, Thomas A.; Crockett, Rachel A.; Hollands, Gareth J.; Johnstone, Elaine C.; Wright, Alison J.; Prevost, A. Toby; Armstrong, David; Sutton, Stephen; Kinmonth, Ann Louise

    2010-11-09

    November 2010 Marteau et al. BMC Public Health 2010, 10:680 http://www.biomedcentral.com/1471-2458/10/680 Page 9 of 10 References 1. Mooney ME, Leventhal AM, Hatsukami DK: Attitudes and knowledge about nicotine and nicotine replacement therapy. Nicotine... , Biomarkers & Prevention 2002, 11:521-528. 25. Wu JR, Moser DK, Lennie TA, Burkhart PV: Medication adherence in patients who have heart failure: A review of the literature. Nursing Clinics of North America 2008, 43:133-153. 26. Shiffman S: Use of more nicotine...

  11. Proposal for the award of a blanket purchase contract for the dismantling, replacement and supply of electrical overhead travelling cranes with a load capacity of up to 10 tonnes

    E-Print Network [OSTI]

    2014-01-01

    Proposal for the award of a blanket purchase contract for the dismantling, replacement and supply of electrical overhead travelling cranes with a load capacity of up to 10 tonnes

  12. Proposal for the award of a blanket purchase contract for the dismantling, refurbishment, replacement and supply of electrical overhead travelling cranes with a load capacity in excess of 10 tonnes

    E-Print Network [OSTI]

    2014-01-01

    Proposal for the award of a blanket purchase contract for the dismantling, refurbishment, replacement and supply of electrical overhead travelling cranes with a load capacity in excess of 10 tonnes

  13. Proposal for the Purchase, Without a Call for Tenders, of Thyristor Assemblies to be Fitted into the PS Magnet Power Supply as Replacement for the Mercury-Arc Rectifiers

    E-Print Network [OSTI]

    1977-01-01

    Proposal for the Purchase, Without a Call for Tenders, of Thyristor Assemblies to be Fitted into the PS Magnet Power Supply as Replacement for the Mercury-Arc Rectifiers

  14. Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) – Interconnect Between Canals 39 and 13-A1 and Replacement of Rio Grande Diversion Pumping Plant 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

    2003-01-01

    Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) – Interconnect Between Canals 39 and 13-A1 and Replacement of Rio Grande Diversion Pumping Plant M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant John R... District No. 2 (San Benito) page xiv of 82 Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) – Interconnect Between Canals 39 and 13-A1 and Replacement of Rio Grande Diversion Pumping...

  15. Lee Ufan and the Art of Mono-ha in Postwar Japan (1968-1972)

    E-Print Network [OSTI]

    Yoshitake, Mika Monique

    2012-01-01

    Electric  cord:  60   m,  Lightbulbs:  650W  and  60W.  Electric  cord:   60  m,  Lightbulbs:  650W  and  60W.  

  16. Demonstration of LED Retrofit Lamps at the Smithsonian American Art Museum, Washington, DC

    SciTech Connect (OSTI)

    Miller, Naomi J.; Rosenfeld, Scott M.

    2012-06-22

    This report documents observations and results obtained from a lighting demonstration project conducted under the U.S. Department of Energy GATEWAY Solid-State Lighting (SSL) Technology Demonstration Program at the Smithsonain American Art Museum in Washington, DC. LED Lamp samples were tested in the museum workshop, temporarily installed in a gallery for feedback, and ultimately replaced all traditional incandescent lamps in one gallery of modernist art at the American Art Museum and partially replacing lamps in two galleries at the Musesum's Renwick Gallery. This report describes the selection and testing process, technology challenges, perceptions, economics, energy use, and mixed results of usign LED replacement lamps in art galleries housing national treasures.

  17. Construction-employment opportunities of four oil-replacing space-heating alternatives for core areas of thirteen major northeastern and midwestern cities

    SciTech Connect (OSTI)

    Santini, D.J.; Wernette, D.R.

    1980-07-01

    Construction employment opportunities are compared for four oil-replacing technologies providing equivalent space-heating services to the core areas of 13 major northeastern and midwestern cities. The four technologies are: cogeneration district heating, coal gasification, coal liquefaction and electrification (coal-fired power plant). It is observed that the district-heating option places a higher percentage of its capital stock within the center city. It also requires lower occupational skills for its construction than the other three alternatives. In view of the lower average educational level of minorities and their concentration in urban areas, substantially more minority employment should occur if district heating is implemented. This alternative also will provide employment opportunities for unemployed nonminority construction laborers and contribute indirectly to the improvement of inner-city neighborhoods where many unemployed construction laborers live.

  18. Soot particle size measurements in laminar premixed ethylene flames with laser-induced incandescence and scanning mobility particle sizer

    E-Print Network [OSTI]

    Yin, Chung-Yuan

    2009-01-01

    Size Measurements in Laminar Premixed Ethylene Flames withof soot aggregate sampled from a laminar acetyleneSize Measurements in Laminar Premixed Ethylene Flames with

  19. Soot particle size measurements in laminar premixed ethylene flames with laser-induced incandescence and scanning mobility particle sizer

    E-Print Network [OSTI]

    Yin, Chung-Yuan

    2009-01-01

    Methane, Propane, and Ethylene Diffusion Flames,” CombustionPropane Diffusion Flames,” Applied Optics 40 (15): 2443-2452 (2001) Haynes BS, Wagner HG, “Soot Formation,” Progress in Energy and Combustion

  20. Finding of No Significant Impact for the Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana

    SciTech Connect (OSTI)

    N /A

    2004-08-31

    DOE has prepared an Environmental Assessment (EA), DOE/EA-1497, for the proposed replacement of the existing 107 centimeter (cm) [42 inch (in)] 6.87 kilometer (km) [4.27 mile (mi)] raw water intake pipeline (RWIPL). This action is necessary to allow for continued, optimum operations at the West Hackberry facility (main site/facility). The EA described the proposed action (including action alternatives) and three alternatives to the proposed action. The EA evaluated only the potential environmental consequences of the proposed action (one action alternative), and Alternative 3, which consisted of the No Build Action that is required by 10 CFR 1021.321(c). Based on the analysis in DOE/EA-1497, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting humans or the natural environment within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 USC 4321 et seq. Therefore, an Environmental Impact Statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI). To further minimize impacts to environmental media, the DOE will also implement a Mitigation Action Plan (MAP) for this action. The MAP is included as Appendix F of this EA, which is appended to this FONSI. The Energy Policy and Conservation Act of 1975 (EPCA), as amended, authorizes the creation of the Strategic Petroleum Reserve (SPR) to store crude oil to reduce the United States' vulnerability to energy supply disruptions. Crude oil is stored in geologic formations, or salt domes, located under these facilities. The purpose of this proposed project is to construct a new RWIPL at the main site to replace the existing RWIPL which services this facility.

  1. Scheduling screening inspections for replaceable and non-replaceable systems 

    E-Print Network [OSTI]

    Aral, Bahadir

    2009-05-15

    This dissertation focuses on developing inspection schedules to detect non-self- announcing events which can only detected by inspections. Failures of protective sys- tems ,such as electronic equipments, alarms and stand-by systems, incipient...

  2. SU-F-BRE-13: Replacing Pre-Treatment Phantom QA with 3D In-Vivo Portal Dosimetry for IMRT Breast Cancer

    SciTech Connect (OSTI)

    Stroom, J; Vieira, S; Greco, C; Olaciregui-Ruiz, I; Rozendaal, R; Herk, M van; Moser, E

    2014-06-15

    Purpose: Pre-treatment QA of individual treatment plans requires costly linac time and physics effort. Starting with IMRT breast treatments, we aim to replace pre-treatment QA with in-vivo portal dosimetry. Methods: Our IMRT breast cancer plans are routinely measured using the ArcCheck device (SunNuclear). 2D-Gamma analysis is performed with 3%/3mm criteria and the percentage of points with gamma<1 (nG1) is calculated within the 50% isodose surface. Following AAPM recommendations, plans with nG1<90% are approved; others need further inspection and might be rejected. For this study, we used invivo portal dosimetry (IPD) to measure the 3D back-projected dose of the first three fractions for IMRT breast plans. Patient setup was online corrected before for all measured fractions. To reduce patient related uncertainties, the three IPD results were averaged and 3D-gamma analysis was applied with abovementioned criteria . For a subset of patients, phantom portal dosimetry (PPD) was also performed on a slab phantom. Results: Forty consecutive breast patients with plans that fitted the EPID were analysed. The average difference between planned and IPD dose in the reference point was ?0.7+/?1.6% (1SD). Variation in nG1 between the 3 invivo fractions was about 6% (1SD). The average nG1 for IPD was 89+/?6%, worse than ArcCheck (95+/?3%). This can be explained by patient related factors such as changes in anatomy and/or model deficiencies due to e.g. inhomogeneities. For the 20 cases with PPD, mean nG1 was equal to ArcCheck values, which indicates that the two systems are equally accurate. These data therefore suggest that proper criteria for 3D invivo verification of breast treatments should be nG1>80% instead of nG1>90%, which, for our breast cases, would result in 5% (2/40) further inspections. Conclusion: First-fraction in-vivo portal dosimetry using new gamma-evaluation criteria will replace phantom measurements in our institution, saving resources and yielding 3D dosimetry of the actual patient treatment.

  3. Anterior Myocardial Territory May Replace the Heart as Organ at Risk in Intensity-Modulated Radiotherapy for Left-Sided Breast Cancer

    SciTech Connect (OSTI)

    Tan Wenyong; Liu Dong; Xue Chenbin; Xu Jiaozhen; Li Beihui; Chen Zhengwang; Hu Desheng; Wang Xionghong

    2012-04-01

    Purpose: We investigated whether the heart could be replaced by the anterior myocardial territory (AMT) as the organ at risk (OAR) in intensity-modulated radiotherapy (IMRT) of the breast for patients with left-sided breast cancer. Methods and Materials: Twenty-three patients with left-sided breast cancer who received postoperative radiation after breast-conserving surgery were studied. For each patient, we generated five IMRT plans including heart (H), left ventricle (LV), AMT, LV+AMT, and H+LV as the primary OARs, respectively, except both lungs and right breast, which corresponded to IMRT(H), IMRT(LV), IMRT(AMT), IMRT(LV+AMT), and IMRT(H+LV). For the planning target volumes and OARs, the parameters of dose-volume histograms were compared. Results: The homogeneity index, conformity index, and coverage index were not compromised significantly in IMRT(AMT), IMRT(LV) and IMRT(LV+ AMT), respectively, when compared with IMRT(H). The mean dose to the heart, LV, and AMT decreased 5.3-21.5% (p < 0.05), 19.9-29.5% (p < 0.05), and 13.3-24.5% (p < 0.05), respectively. Similarly, the low (e.g., V5%), middle (e.g., V20%), and high (e.g., V30%) dose-volume of the heart, LV, and AMT decreased with different levels. The mean dose and V10% of the right lung increased by 9.2% (p < 0.05) and 27.6% (p < 0.05), respectively, in IMRT(LV), and the mean dose and V5% of the right breast decreased significantly in IMRT(AMT) and IMRT(LV+AMT). IMRT(AMT) was the preferred plan and was then compared with IMRT(H+LV); the majority of dose-volume histogram parameters of OARs including the heart, LV, AMT, both lungs, and the right breast were not statistically different. However, the low dose-volume of LV increased and the middle dose-volume decreased significantly (p < 0.05) in IMRT(AMT). Also, those of the right lung (V10%, V15%) and right breast (V5%, V10%) decreased significantly (p < 0.05). Conclusions: The AMT may replace the heart as the OAR in left-sided breast IMRT after breast-conserving surgery to decrease the radiation dose to the heart.

  4. White lighting LEDs are fast replacing conventional lighting because not only are they energy efficient light sources but also can be modulated at frequencies up to 20MHz for high-speed wireless communication, especially for indoor applications.

    E-Print Network [OSTI]

    Sekercioglu, Y. Ahmet

    Background White lighting LEDs are fast replacing conventional lighting because not only by using ceiling mounted white lighting LEDs Jiun Bin Choong Supervisor : Prof. Jean Armstrong A B F 1 2 1 are they energy efficient light sources but also can be modulated at frequencies up to 20MHz for high

  5. [Minor revisionposted 8/26/13 (replaces 7/31/13 edition)] [7/24/14updated reference to SACSCOC (no additional change to 8/26/13 edition)

    E-Print Network [OSTI]

    Rock, Chris

    OP 36.04 [Minor revision­posted 8/26/13 (replaces 7/31/13 edition)] [7/24/14­updated reference to SACSCOC (no additional change to 8/26/13 edition)] Operating Policy and Procedure OP 36.04: New Academic Programs, Course Approval for New Programs, Program Termination, and Changes in Delivery Format DATE

  6. Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energy’s Idaho Site

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared, for a proposal to provide a replacement capability for continued disposal of remote-handled low-level radioactive waste that is generated at the Idaho National Laboratory site.

  7. Demonstration of Recessed Downlight Technologies: Power and Illumination Assessment

    SciTech Connect (OSTI)

    Parker, Steven A.; Beeson, Tracy A.

    2009-11-20

    Solid state lighting (SSL), specifically light-emitting diodes (LED), has been advancing at a rapid pace, and there are presently multiple products available that serve as direct replacements for traditional luminaires. In this demonstration, conventional recessed lights in a conference room were used to compare conventional incandescent A-lamps, incandescent reflector R-lamps, dimming compact fluorescent lamps (CFL), to an LED replacement product. The primary focus during the study was on light delivered to the task plane as provided by the power required by the lighting system. Vertical illuminance, dimming range, and color shift are also important indicators of lighting quality and are discussed in the report. The results clearly showed that LEDs, with dimming-capable drivers, are much more efficient than incandescent and CFLs. Further, LEDs provide much smoother and consistent dimming than dimmable CFLs. On the potential negative side, it is important that the dimming switch be identified as compatible with the LED driver. A wide variety of dimmer switches are capable of dimming LEDs down to 15% of full light output, while select others can be capable of dimming LEDs down to 5%. In addition, LEDs can be intensive light sources, which can result in uncomfortable glare in some applications and to some occupants. Higher ceiling (9-foot or greater) or non-specular reflectors can act to alleviate the potential for glare.

  8. EIS-0350-S1: Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico

    Broader source: Energy.gov [DOE]

    This Supplemental EIS evaluates the completion of the Chemistry and Metallurgy Research Building Replacement (CMRR) Project, which consists of constructing the nuclear facility portion (CMRR-NF) at Los Alamos National Laboratory (LANL). The CMRR Project provides the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. Because of recent detailed site geotechnical investigations, certain aspects of the CMRR-NR project have changed resulting in change to the environmental impacts.

  9. DOE Media Advisory- DOE extends public comment period on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energy’s Idaho Site

    Broader source: Energy.gov [DOE]

    In response to requests from people interested in National Environmental Policy Act activities occurring at the U.S. Department of Energy’s Idaho Operations Office, the department has extended the public comment period that began September 1 on the Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energy’s Idaho Site.

  10. Issues and recommendations related to replacement of CFC-114 at the uranium enrichment gaseous diffusion plant. Task title: Chlorofluorocarbon (CFC) Program Review, Final report, August 1, 1991--October 1, 1992

    SciTech Connect (OSTI)

    Anderson, B.L.; Banaghan, E.

    1993-03-31

    The operating uranium enrichment gaseous diffusion plants (GDPs) in Portsmouth, Ohio and Paducah, Kentucky, which are operated for the United States Department for Energy by Martin Marietta Energy Systems (MMES), currently use a chlorofluorocarbon (CFC-114) as the primary process stream coolant. Due to recent legislation embodied in the Clean Air Act, the production of this and other related chlorofluorocarbons (CFCS) are to be phased out with no production occurring after 1995. Since the plants lose approximately 500,000 pounds per year of this process stream coolant through various leaks, the GDPs are faced with the challenge of identifying a replacement coolant that will allow continued operation of the plants. MMES formed the CFC Task Team to identify and solve the various problems associated with identifying and implementing a replacement coolant. This report includes a review of the work performed by the CFC Task Team, and recommendations that were formulated based on this review and upon original work. The topics covered include; identifying a replacement coolant, coolant leak detection and repair efforts, coolant safety concerns, coolant level sensors, regulatory issues, and an analytical decision analysis.

  11. EA-1664: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    10 CFR Part 430 Energy Conservation Standards: Energy Conservation Standards for Fluorescent and Incandescent Lamps

  12. Photo: D. Stevenson and C. Conway/Beckman Institute/University of Illinois An inorganic LED display printed on a flexible substrate bends without breaking

    E-Print Network [OSTI]

    Rogers, John A.

    cameras. Conventional inorganic LEDs, which are poised to put incandescent and fluorescent lightbulbs out

  13. Phys. Med. Biol. 43 (1998) 24072412. Printed in the UK PII: S0031-9155(98)90934-4 Effects of read-out light sources and ambient light on

    E-Print Network [OSTI]

    Yu, Peter K.N.

    1998-01-01

    laser, light emitting diode (LED) and incandescent read-out light sources produce an equivalent dose

  14. ,,,"Incandescent","Standard Fluorescent","Compact Fluorescent","High-Intensity Discharge","Halogen"

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: AlternativeMonthly","10/2015"Monthly","10/2015" ,"Release7 Relative Standard Errors for Table 5.7;" " Unit:8977.8.38.

  15. ,,,"Incandescent","Standard Fluorescent","Compact Fluorescent","High-Intensity Discharge","Halogen"

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: AlternativeMonthly","10/2015"Monthly","10/2015" ,"Release7 Relative Standard Errors for Table 5.7;" "

  16. Collector main replacement at Indianapolis Coke

    SciTech Connect (OSTI)

    Sickle, R.R. Van

    1997-12-31

    Indianapolis Coke is a merchant coke producer, supplying both foundry and blast furnace coke to the industry. The facility has three coke batteries: two 3 meter batteries, one Wilputte four divided and one Koppers Becker. Both batteries are underjet batteries and are producing 100% foundry coke at a net coking time of 30.6 hours. This paper deals with the No. 1 coke battery, which is a 72 oven, gun fired, 5 meter Still battery. No. 1 battery produces both foundry and blast furnace coke at a net coking rate of 25.4 hours. No. 1 battery was commissioned in 1979. The battery is equipped with a double collector main. Although many renovations have been completed to the battery, oven machinery and heating system, to date no major construction projects have taken place. Deterioration of the collector main was caused in part from elevated levels of chlorides in the flushing liquor, and temperature fluctuations within the collector main. The repair procedures are discussed.

  17. Remotely replaceable tokamak plasma limiter tiles

    DOE Patents [OSTI]

    Tsuo, Simon (Lakewood, CO), Langford, Alison A. (Boulder, CO)

    1989-01-01

    U-shaped limiter tiles placed end-to-end over a pair of parallel runners secured to a wall have two rods which engage L-shaped slots in the runners. The short receiving legs of the L-shaped slots are perpendicular to the wall and open away from the wall, while long retaining legs are parallel to and adjacent the wall. A sliding bar between the runners has grooves with clips to retain the rods pressed into receiving legs of the L-shaped slots in the runners. Sliding the bar in the direction of retaining legs of the L-shaped slots latches the tiles in place over the runners. Resilient contact strips between the parallel arms of the U-shaped tiles and the wall assure thermal and electrical contact with the wall.

  18. Optimal scheduling for replacing perimeter guarding unmanned ...

    E-Print Network [OSTI]

    2014-08-20

    Relations (6) and (7) allow us to present problem (5) in the following equivalent ..... In IEEE International Conference on Robotics and Automation (ICRA), pages.

  19. Solid State Replacement of Rotating Mirror Cameras

    SciTech Connect (OSTI)

    Frank, A M; Bartolick, J M

    2006-08-25

    Rotating mirror cameras have been the mainstay of mega-frame per second imaging for decades. There is still no electronic camera that can match a film based rotary mirror camera for the combination of frame count, speed, resolution and dynamic range. The rotary mirror cameras are predominantly used in the range of 0.1 to 100 micro-seconds per frame, for 25 to more than a hundred frames. Electron tube gated cameras dominate the sub microsecond regime but are frame count limited. Video cameras are pushing into the microsecond regime but are resolution limited by the high data rates. An all solid state architecture, dubbed ''In-situ Storage Image Sensor'' or ''ISIS'', by Prof. Goji Etoh, has made its first appearance into the market and its evaluation is discussed. Recent work at Lawrence Livermore National Laboratory has concentrated both on evaluation of the presently available technologies and exploring the capabilities of the ISIS architecture. It is clear though there is presently no single chip camera that can simultaneously match the rotary mirror cameras, the ISIS architecture has the potential to approach their performance.

  20. Promising Technology: R-5 Window Replacements

    Broader source: Energy.gov [DOE]

    A significant amount of the energy used to heat and cool commercial buildings is lost through inefficient windows. Incorporating windows into a building that are resistant to heat transfer can significantly reduce the amount of energy that is lost through windows. R-values are an indication of how resistant a window is to heat transfer, and a larger R-value indicates a more insulating window. An R-5 window represents an efficient window, and has a larger R-value than what is required to qualify for ENERGY STAR.

  1. REPLACE YOUR MERCURY THERMOMETERS BEFORE THEY BREAK!

    E-Print Network [OSTI]

    presents a hazard for faculty, staff, and students in laboratory areas? Mercury also presents a hazard mercury thermometers create hazardous waste that is costly to clean up and costly to dispose of. Other generating hazardous waste from spill clean-up. · Mercury is volatile at room temperature with vapors

  2. Replacing the Rare Earth Intellectual Capital

    SciTech Connect (OSTI)

    Gschneidner, Jr., Karl

    2011-04-01

    The rare earth crisis slowly evolved during a 10 to 15 year period beginning in the mid-1980s, when the Chinese began to export mixed rare earth concentrates. In the early 1990s, they started to move up the supply chain and began to export the individual rare earth oxides and metals. By the late 1990s the Chinese exported higher value products, such as magnets, phosphors, polishing compounds, catalysts; and in the 21st century they supplied finished products including electric motors, computers, batteries, liquid-crystal displays (LCDs), TVs and monitors, mobile phones, iPods and compact fluorescent lamp (CFL) light bulbs. As they moved to higher value products, the Chinese slowly drove the various industrial producers and commercial enterprises in the US, Europe and Japan out of business by manipulating the rare earth commodity prices. Because of this, the technically trained rare earth engineers and scientists who worked in areas from mining to separations, to processing to production, to manufacturing of semifinished and final products, were laid-off and moved to other fields or they retired. However, in the past year the Chinese have changed their philosophy of the 1970s and 1980s of forming a rare earth cartel to control the rare earth markets to one in which they will no longer supply the rest of the world (ROW) with their precious rare earths, but instead will use them internally to meet the growing demand as the Chinese standard of living increases. To this end, they have implemented and occasionally increased export restrictions and added an export tariff on many of the high demand rare earth elements. Now the ROW is quickly trying to start up rare earth mines, e.g. Molycorp Minerals in the US and Lynas Corp. in Australia, to cover this shortfall in the worldwide market, but it will take about five years for the supply to meet the demand, even as other mines in the ROW become productive. Unfortunately, today there is a serious lack of technically trained personnel to bring the entire rare earth industry, from mining to original equipment manufacturers (OEM), up to full speed in the next few years. Accompanying this decline in technical expertise, innovation and new products utilizing rare earth elements has slowed dramatically, and it may take a decade or more to recapture America's leading role in technological advancements of rare earth containing products. Before the disruption of the US rare earth industry, about 25,000 people were employed in all aspects of the industry from mining to OEM. Today, only about 1,500 people are employed in these fields. The ratio of non-technically trained persons to those with college degrees in the sciences or engineering varies from about 8 to 1 to about 4 to 1, depending on the particular area of the industry. Assuming an average of 6 to 1, the number of college degree scientists and engineers has decreased from about 4,000 to 250 employed today. In the magnetic industry the approximate numbers are: 6,000 total with 750 technically trained people in the 1980s to 500 totally employed today of which 75 have degrees. The paucity of scientists and engineers with experience and/or training in the various aspects of production and commercialization of the rare earths is a serious limitation to the ability of the US to satisfy its own needs for materials and technologies (1) to maintain our military strength and posture, (2) to assume leadership in critical energy technologies, and (3) to bring new consumer products to the marketplace. The lack of experts is of even greater national importance than the halting in the 1990s and the recent restart of the mining/benification/separation effort in the US; and thus governmental intervention and support for at least five to 10 years will be required to ameliorate this situation. To respond quickly, training programs should be established in conjunction with a national research center at an educational institution with a long tradition in multiple areas of rare earth and other critical elements research and technology. This center should

  3. Replacing an Oversized and Underloaded Electric Motor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    interpolation between a motor's full- and half-load current values. The modified equation, useful for estimating loads in the 50% to full-load range, is: Motor Load 0.5 +...

  4. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    tube bulkheads, intake gates and intake bulkheads is to completely dewater a turbine generator unit. The gates and bulkheads may be used for planned or scheduled maintenance,...

  5. Developing Business Case for Electrical System Replacement

    E-Print Network [OSTI]

    Miller, Carles

    2006-05-19

    to estimate proposed options, and how to use reliability analysis as an essential tool for developing economic justification and ranking the proposed options for electrical upgrade projects. The concepts of reliable electrical systems, and the use of IEEE Std...

  6. Remotely replaceable tokamak plasma limiter tiles

    DOE Patents [OSTI]

    Gallix, R.

    1987-12-09

    U-shaped tiles placed end-to-end over a pair of parallel runners have two rods which engage L-shaped slots. A sliding bar between the runners has grooves with clips to retain the rods pressed into receiving legs of the L-shaped slots in the runners. Sliding the bar in the direction of retaining legs of the L-shaped slots latches the tiles in place over the wall. Resilient contact strips under the parallel sides of the U-shaped tile assure thermal and electrical contact with the wall. 6 figs.

  7. Organic agriculture cannot replace conventional agriculture

    E-Print Network [OSTI]

    Kolokolnikov, Theodore

    and Statistics Submitted to Proceedings of the National Academy of Sciences of the United States of America dispersal with a diffusive logistic equation in which the growth/death rate is spatially heterogeneous. We annual growth rate of about 20%, although it reaches 50% in Turkey [5]. Initially supplied by numerous

  8. Evaluation of alternative sign replacement strategies 

    E-Print Network [OSTI]

    McCaleb, James Bradley

    1996-01-01

    implement a Sign Management/Inventory System to meet the expected minimum retroreflectivity values and to effectively manage the traffic signs on Texas' highways....

  9. Replaces DOE F 5120.2

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996HowFOA Applicantof Years | DepartmentRelated Links13423700.2 (09-93)

  10. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journalvivo Low-Dose Low LETUsefulJorgeAtl anta,GraduateTimePowerhouse 1

  11. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journalvivo Low-Dose Low LETUsefulJorgeAtl anta,GraduateTimePowerhouse

  12. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journalvivo Low-Dose Low LETUsefulJorgeAtl anta,GraduateTimePowerhouseG22 -

  13. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journalvivo Low-Dose Low LETUsefulJorgeAtl anta,GraduateTimePowerhouseG22

  14. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journalvivo Low-Dose Low LETUsefulJorgeAtl

  15. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journalvivo Low-Dose Low LETUsefulJorgeAtlDay Draft Tube Bulkheads and

  16. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journalvivo Low-Dose Low LETUsefulJorgeAtlDay Draft Tube Bulkheads

  17. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journalvivo Low-Dose Low LETUsefulJorgeAtlDay Draft Tube BulkheadsValley

  18. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journalvivo Low-Dose Low LETUsefulJorgeAtlDay Draft Tube

  19. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journalvivo Low-Dose Low LETUsefulJorgeAtlDay Draft TubeSpare Transformers

  20. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journalvivo Low-Dose Low LETUsefulJorgeAtlDay Draft TubeSpare

  1. Replacing Lightbulbs and Ballasts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnowRedoxRelated

  2. Vapor pressures of mixtures of CFC-114 with the potential replacement coolants C{sub 4}F{sub 10} and c-C{sub 4}F{sub 8}

    SciTech Connect (OSTI)

    Trowbridge, L.D. [Oak Ridge K-25 Site, TN (United States); Otey, M.G. [Paducah Gaseous Diffusion Plant, KY (United States)

    1994-09-01

    The U.S. Enrichment Corporation`s production of isotopically enriched uranium depends solely on two plants which utilize the gaseous diffusion process. This process uses large quantities of CFC-114 as an evaporative coolant. CFC-114, however, will be phased out of production at the end of 1995 due to its potential to deplete stratospheric ozone. A search has been underway for substitutes for a number of years. The initial search (1988-89) for an ozone-friendly, commercially available, chemically compatible substitute yielded two candidates, FC-c318 (c-C{sub 4}F{sub 8}) and FC-3110 (C{sub 4}F{sub 10}). The intended mode of replacing coolant was to stage the new coolant into independent subsystems of the plants, so that some systems would continue to operate on CFC-114, and an increasing number would operate on the new coolant. During that changeover process, the possibility of coolant mixing arises in variety of scenarios. This work was intended to generate sufficient experimental information to be able to predict the vapor pressure of coolant mixtures over the range of operating conditions likely to be found in the diffusion plants. Specifically, vapor pressures were measured over the temperature range 322 to 355 K (120{degrees}F to 180{degrees}F) and over the full range of mole fractions for binary mixtures of CFC-114 with FC-3110, and of CFC-114 with FC-c318.

  3. Max Tech Appliance Design: Potential for Maximizing U.S. Energy Savings through Standards

    E-Print Network [OSTI]

    Garbesi, Karina

    2011-01-01

    fluorescent and lighting dominantly incandescent. LED)LED incandescent efficacies are expected to increase lightingLED Heat pump Heat pump Heat pump d Energy Use (TWh) a Lighting (

  4. Program Potential: Estimates of Federal Energy Cost Savings from Energy Efficient Procurement

    E-Print Network [OSTI]

    Taylor, Margaret

    2014-01-01

    LED Lighting .Substitute Products  LED Lighting  Currently, incandescentCFLs. Alternatively, LED lighting could potentially take on

  5. Second Exam Probability

    E-Print Network [OSTI]

    Glowinski, Roland

    supply room contains four 40-W lightbulbs, five 60-W bulbs, and six 75-W bulbs. Suppose that three bulbs

  6. Washington State Department of Ecology: Replacement Wells Requiring a Water

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin,VillageWarren Park,| Open EnergyInformationEcology Jump

  7. Replace V-Belts with Notched or Synchronous Belt Drives

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A properly designed belt power-transmission system offers high efficiency and low noise, requires no lubrication, and presents low maintenance requirements. However, certain...

  8. Hormone Replacement Therapy and Height Loss: Does Estrogen Prevent Shrinking?

    E-Print Network [OSTI]

    Hall, Victoria M

    1993-01-01

    in Radiology: Dual Energy Radiographic Absorptiometry forChristiansen, C. "Dual-Energy X-ray Absorptiometry: A

  9. Trim or Replace Impellers on Oversized Pumps: Industrial Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    pump exceeds process requirements. * System bypass valves are open, indicating excess flow rate. * The pump is operating far from its design point. * The operating head and (or)...

  10. Effects of an Accelerated Diesel Engine Replacement/Retrofit Program

    E-Print Network [OSTI]

    Millstein, Dev E.; Harley, Robert A

    2009-01-01

    and Cackette, T. A. , (2001). Diesel engines: environmentalfrom On-Road Gasoline and Diesel Vehicles. Atmos. Environ.emissions from gasoline- and diesel-powered motor vehicles.

  11. Replacing Motors Counting Savings: Results from a 100 Motor Study 

    E-Print Network [OSTI]

    Kaufman, N. M.

    2006-01-01

    that this model is too simple for application in the complex economy of industry. When new motor purchase is planned and specifically budgeted, particularly for expansion or upgrade, it makes sense to account for the present value of the energy savings... based on manufacturer data of available motors accurately reflected the motors found in industry. Based on testing results of 64 motors operating in industry for at least the past ten years, it is determined that tested values at rated load do...

  12. Extension and replacement of aspalt cement with sulphur 

    E-Print Network [OSTI]

    Pickett, Daniel Ernest

    1977-01-01

    LLI V) O 0 I- LIJ IO UI O O Lo IO' 300 400 TEMPERATURE ('F) FIG. I--Viscosity-temperature curve for liquid sulphur. 13 Sul hur-As halt Mixtures An excellent source of information about sulphur-asphalt applications is an annotated... and provides a mechanical inter- locking effect (3, 7, 61). The sul'phur serves as a filler of the voids between the aggregate particles. As the molten sulphur cools below the melting point of about 245 F (118 C) it solidifies and creates the 20...

  13. The potential commercialization of neuronal replacement therapy using smart polymers

    E-Print Network [OSTI]

    Dutt, Anindita, 1971-

    2005-01-01

    NeuroBioChip Device is a programmable, biocompatible, biodegradable, polymer matrix which allows the growth and programming of donor neurons. It creates a microenvironment conducive for neuronal outgrowth and promises a ...

  14. Glove port retrofit assembly and method of replacing components

    DOE Patents [OSTI]

    Giesen, Isaac M; Cournoyer, Michael E; Rael, David G

    2014-11-18

    What is disclosed is a system for retrofitting a sealed enclosure for performing work therein having an outer enclosure assembly configured to be clamped to the outer annular face of a port ring and form a sealed engagement with the outer annular surface of the port ring, a change assembly having an inner ring and an access element wherein the inner ring has a first annular cylinder body that is sized to be slidably received by the port ring and the access element is configured to be sealably and slidably positioned within the first annular cylinder body of the inner ring.

  15. Load beam unit replaceable inserts for dry coal extrusion pumps

    DOE Patents [OSTI]

    Saunders, Timothy; Brady, John D.

    2012-11-13

    A track assembly for a particulate material extrusion pump according to an exemplary aspect of the present disclosure includes a link assembly with a roller bearing. An insert mounted to a load beam located such that the roller bearing contacts the insert.

  16. Interactive Catalog Replaces Catalog Pages Sensing and Control

    E-Print Network [OSTI]

    Lozano-Nieto, Albert

    of 7 mA at 5 VDC for energy efficiency · Single current sinking or current sourcing output · Linear sensing element for stable output TYPICAL APPLICATIONS · Current sensing · Motor control · Position. These linear position sensors have an operating temperature range of -40C to +150°C, appropriate for industrial

  17. Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered...

    Broader source: Energy.gov (indexed) [DOE]

    Energy Program project results in annual estimated cost savings of 313,000 for reduced consumption of gasoline, diesel, propane, and electricity. Location Arizona Partners State...

  18. Replace Pressure-Reducing Valves with Backpressure Turbogenerators...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    distribution system to let down or reduce its pressure. A noncondensing or backpressure steam turbine can perform the same pressure-reducing function as a PRV while converting...

  19. Progammatic mission transformation - chemistry and metallurgy research replacement (CMRR) project

    SciTech Connect (OSTI)

    Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

    2011-01-24

    Nuclear posture and policy objectives are: (1) Preventing nuclear proliferation and nuclear terrorism; (2) Reducing the role of nuclear weapons in US national security strategy; (3) Maintaining strategic deterrence and stability at reduced nuclear force levels; (4) Strengthening regional deterrence and reassuring US allies and partners; and (5) Sustaining a safe, secure, and effective nuclear arsenal.

  20. Cobalt discovery replaces precious metals as industrial catalyst

    E-Print Network [OSTI]

    chemistry #12;- 2 - LOS ALAMOS, N.M., November 26, 2012--Cobalt, a common metal, holds promise. 26 in the international edition of the chemistry journal Angewandte Chemie, Los Alamos National. They are the noble metal elements such as platinum, palladium, rhodium, and ruthenium, which are a prohibitively

  1. New Feedstocks and Replacement Fuels- Future Energy for Mobility

    Broader source: Energy.gov [DOE]

    Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan. Sponsored by the U.S. DOE's EERE FreedomCar and Fuel Partnership and 21st Century Truck Programs.

  2. Butyl acetate replaces toluene to remove phenol from water

    SciTech Connect (OSTI)

    Hodel, A.E.

    1993-03-01

    Plastics Engineering Co. manufactures phenol formaldehyde resins and molding compounds at a plant in Sheboygan, WI. Process water from the plant, containing 7% phenol and 1% methanol, requires treatment prior to discharge to the sewer. Toluene was used as a solvent in a countercurrent liquid-liquid extraction column. A vacuum distillation of the extract separated the phenol and toluene. The raffinate (1% methanol, 98% water and 1% toluene) was stripped to recover the toluene and remove methanol from the bottoms prior to discharge. Methanol was not recovered. Disposal costs for the waste methanol (with about 10% toluene as an azeotrope) were high.

  3. Height Replacement of Selected Woody Plants Following Burning or Shredding. 

    E-Print Network [OSTI]

    Hamilton, W.T.; Kitchen, L.M.; Scifres, C.J.

    1981-01-01

    Selected Woody Plants Following Burning or Shredding CONTENTS ...................................... Summary . - i ,.z;.., s * ' ............................ a ,, Jntroduction.. v ~ ~ ~ z z . . 4 *- e -- .d 5- . ..... ...... .. * 2 $$escription... of Selected Woody Plants Following Burning or Shredding SUMMARY Woody plant reinvasion of tame pastures and native rangeland is a ' severe problem on the South Texas Plains. Shredding and/or pre- scribed burning may be employed as lowcost methods...

  4. New Feedstocks and Replacement Fuel Diesel Engine Challenges

    Broader source: Energy.gov [DOE]

    Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan. Sponsored by the U.S. DOE's EERE FreedomCar and Fuel Partnership and 21st Century Truck Programs.

  5. Why New Neutron Detector Materials Must Replace Helium-3

    SciTech Connect (OSTI)

    Hurd, Alan J.; Kouzes, Richard T.

    2014-10-01

    This is an article for the European Physics Journal on the status of the He-3 problem. Alan Hurd from LANL is the main author.

  6. Vitamin D Deficiency and Replacement: Relationships to Cardiovascular Health

    E-Print Network [OSTI]

    Vacek, James

    2010-04-11

    /ml). Vitamin D deficiency was found to be associated with several cardiovascular disease states including hypertension, coronary artery disease and cardiomyopathy; as well as diabetes and death (all P's Logistic regression analysis found vitamin D...

  7. Title Page Dummy This Page will be Replaced before Printing

    E-Print Network [OSTI]

    Olesen, Mara Luz Pablo, Dinh Thuy Phan Huy, Stephan Saur, Mikael Sternad, Tommy Svensson, Randa Zakhour¨ojd, Maria Luz Pablo, Richard Fritzsche, Hajer Khanfir, Slim Ben Halima, Tommy Svensson, Tilak Rajesh

  8. LONG TERM FILE MIGRATION - PART II: FILE REPLACEMENT ALGORITHMS

    E-Print Network [OSTI]

    Jay Smith, Alan

    2011-01-01

    ~~"-' ,m . I 'f'-~I I ,/:? :RIlNG SET r -t j IS) iO" 1C. ~ETNR(LSIZEt>ClIISS)/ '.I~RllNG LJ.J 8DGO Ot\\ YS ~~:\\ j3 1 :in ~ill particular a batch lng OD aEriv~l phenomenon r by

  9. RESEARCH ARTICLE Proteolipid Protein Cannot Replace P0

    E-Print Network [OSTI]

    functions of CNS and PNS myelin are identical. Both concentrate Na1 channels at nodes of Ranvier and thereby at wileyonlinelibrary.com. DOI: 10.1002/glia.22733 Published online Month 00, 2014 in Wiley Online Library (wileyonlinelibrary.com). Received Apr 23, 2014, Accepted for publication July 14, 2014. Address correspondence

  10. Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    saving over 30,000 gallons of gasoline, 37,242 gallons of diesel, 9,820 gallons of propane, and producing 217,350 kilowatt-hours (kWh) of electricity each year. The...

  11. RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS

    E-Print Network [OSTI]

    Cizelj, Leon

    -service inspection is performed using non-destructive examination techniques, e.g., eddy current testing. Especially

  12. Electric plugs--repair or replace The problem

    E-Print Network [OSTI]

    need s New plug­if your old one cannot be used. (Buy one with a UL label) s A screwdriver s A knife How to 1. Cut the cord off at the damaged part (Fig. 1). 2. Slip the plug back on the cord (Fig. 2). 3

  13. Energy Savings Potential of Process Control Valve Replacement 

    E-Print Network [OSTI]

    Holzenthal, L. Jr.

    1994-01-01

    A review of current design methods for industrial process control systems that utilize modulated control valves as their final element is presented. The infornUltion that is available is then used to find the theoretic ...

  14. Drafty Windows: Is it Better to Insulate or Replace Them?

    Broader source: Energy.gov [DOE]

    I’ve lived in my condominium for several years, and though it naturally stays cooler in the summer (with all west-facing windows) I struggle to keep it warm in the winter without taking out a loan to pay utilities

  15. The opportunistic replacement problem: analysis and case studies

    E-Print Network [OSTI]

    Torgny Almgren

    2009-01-22

    Jan 22, 2009 ... Results from a series of case studies performed in the areas of aircraft engine and wind turbine maintenance are also reported. These illustrate ...

  16. LED Performance Specification Series: T8 Replacement Lamps

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the better fixture efficiency measured with LED T8s compared to fluorescent. Note that luminous efficacy for the LED T8 is not specified. This is because LED T8 watt- age...

  17. Prioritizing Water Pipe Replacement and Rehabilitation by Evaluating Failure Risk 

    E-Print Network [OSTI]

    Lee, Sang Hyun

    2012-02-14

    .1 Problem Statement Damage to water pipes is influenced by various factors, including design, construction, and management. Grey cast iron pipes without any coating or lining in or outside and unlined ductile iron pipes (DIPs) are under the direct... ......................................................................................... 5 2.2 Methods to Access Failure Risk of Water Pipes................................. 6 2.2.1 Deterioration Point Assignment (DPA) Method ....................... 6 2.2.2 Break-even Analysis...

  18. Quenching and Partitioning Process Development to Replace Hot...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    heats with different compositions, the researchers will process the steels with different heat treatments and extensively characterize and test the material to find the best...

  19. Can Computer Simulations Replace Real Equipment in Undergraduate Laboratories?

    E-Print Network [OSTI]

    Colorado at Boulder, University of

    of their mastery of physics concepts and skills with real equipment. Students who used the simulated equipment electricity, magnetism, optics and modern physics. Students, typically in their 2nd or 3rd year of study. K. Perkins, W. Adams, P. Kohl, and N. Podolefsky Department of Physics University of Colorado

  20. Operational test procedure for SY tank farm replacement exhauster unit

    SciTech Connect (OSTI)

    McClees, J.

    1995-09-26

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly.

  1. The deep water gas charged accumulator and its possible replacements 

    E-Print Network [OSTI]

    Mir Rajabi, Mehdi

    2006-04-12

    rate fluid communication and fast response times are required.5 There is no static friction to be overcome as with a piston seal, and there is no piston mass to be accelerated, so response time for such accumulators are very short and less than 25ms...

  2. Quenching and Partitioning Process Development to Replace Hot...

    Broader source: Energy.gov (indexed) [DOE]

    sheet steels: Transition and Deployment PROTEC Leipsic, OH joint venture US steel & Kobe steel of Japan continuous annealing line 400 million investment commissioned May 2013...

  3. Quenching and Partitioning Process Development to Replace Hot...

    Broader source: Energy.gov (indexed) [DOE]

    processing for Third-Generation Advanced High-Strength Steels (3GAHSS) in automotive applications. Factsheet More Documents & Publications Vehicle Technologies Office...

  4. Horizontal well replaces hydraulic fracturing in North Sea gas well

    SciTech Connect (OSTI)

    Reynolds, D.A.; Seymour, K.P. )

    1991-11-25

    This paper reports on excessive water production from hydraulically fractured wells in a poor quality reservoir in the North SEa which prompted the drilling of a horizontal well. Gas production from the horizontal well reached six times that of the offset vertical wells, and no water production occurred. This horizontal well proved commercial the western section of the Anglia field. Horizontal drilling in the North SEa is as an effective technology to enhance hydrocarbon recovery from reservoirs that previously had proven uncommercial with other standard techniques. It is viable for the development of marginal reservoirs, particularly where conditions preclude stimulation from hydraulic fracturing.

  5. CONSTRUCTION BY REPLACEMENT: A NEW APPROACH TO SIMULATION MODELING

    E-Print Network [OSTI]

    Institute of Technology MIT Sloan School of Management Working Paper No. MIT Center for Coordination Science Sloan School of Management) · Thomas W. Malone (MIT Sloan School of Management) · George Herman (MIT Sloan School of Management) · John Quimby(MIT Sloan School of Management) · Mary Murphy Hoye · James

  6. The Chameleon Guitar—Guitar with a Replaceable Resonator

    E-Print Network [OSTI]

    Paradiso, Joseph A.

    Each acoustic instrument is one of a kind. Its unique acoustic properties are transferred from the physical characteristics of its source materials and a handcrafted touch. In contrast, electronic and computer-based ...

  7. Solid-State Spatial Combiner Modules for TWT Replacement

    E-Print Network [OSTI]

    York, Robert A.

    trays of broadband traveling-wave antenna structures, housed in a metal waveguiding enclosure-handling. A multi-octave 64-way passive combiner system using oversized coaxial waveguide will also be presented

  8. New Feedstocks and Replacement Fuels - Future Energy for Mobility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Detroit, Michigan. Sponsored by the U.S. DOE's EERE FreedomCar and Fuel Partnership and 21st Century Truck Programs. 2006deersimnick.pdf More Documents & Publications Fuel-Cycle...

  9. New Feedstocks and Replacement Fuel Diesel Engine Challenges...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Detroit, Michigan. Sponsored by the U.S. DOE's EERE FreedomCar and Fuel Partnership and 21st Century Truck Programs. 2006deerfulton.pdf More Documents & Publications...

  10. Microsoft Word - xx xx 13 Midway pole replacement news release...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hansen, 503-230-4328 or 503-230-5131 BPA to hold public meeting on proposed rebuild of aging transmission line near Yakima, Wash. Portland, Ore. - The Bonneville Power...

  11. Exploring the speed and performance of molecular replacement...

    Office of Scientific and Technical Information (OSTI)

    using the different ab initio modelling programs QUARK and ROSETTA. Search models derived from either program collectively solve almost all of the all-helical targets in the...

  12. Categorical Exclusion 4567, MPLE Test Stand Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D B LReportsDeterminatIonFornl Project Title: Sort andFOrnI

  13. Cobalt discovery replaces precious metals as industrial catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D BGene NetworkNuclearDNP 20082 P r o jJ.Coal to

  14. Cobalt discovery replaces precious metals as industrial catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D BGene NetworkNuclearDNP 20082 P r o jJ.Coal toCobalt Discovery

  15. Boron-10 Neutron Detectors for Helium-3 Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D B L O OLaura|BilayerBiomimeticBooks Are Fun bookHomeland Security

  16. Replace Pressure-Reducing Valves with Backpressure Turbogenerators |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAandSummary From: v2.7 Multiple< Back<<

  17. Replacing an Oversized and Underloaded Electric Motor | Department of

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAandSummary From: v2.7 Multiple<

  18. Trim or Replace Impellers on Oversized Pumps | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE- Non-ResidentialAlliantPGEDepartmentfan system'Inc.ofthe HeadwindsL L E P Othe

  19. California: SQAMD Replaces Drayage Trucks with CNG | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram:Y-12Power,5 BUDGETU S DEPARTMENTJune 18, 2012ofAward |

  20. COLLOQUIUM: Are Mushrooms the Next Polymers?: Growing Plastic Replacements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room News PublicationsAudits &Bradbury ScienceComplex earningHydraulicLabPhysics

  1. Cobalt discovery replaces precious metals as industrial catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room News PublicationsAuditsCluster Compatibility Mode Cluster CompatibilityCoal MarketsCoalCobalt

  2. REQUEST FOR LOST/STOLEN BADGE REPLACEMENT | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidentialThis 3-D rendering ofForm documents the circumstances

  3. Quenching and Partitioning Process Development to Replace Hot Stamping of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct. 7, 2011 |1 DOEAssuranceApril 2012

  4. Sprinkler Head Replacement (4586), 4/24/2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effect Photovoltaics -7541C.3 SpecialSponsor Guidelines CandidatesSpring

  5. Biomass 2011: Replace the Whole Barrel, Supply the Whole Market |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based Fuels Researchof Energy|Make FuelsBioindustryWBS 1.2.3.3

  6. Project Title: X-Ray Machine Replacement Project (4552)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptions |(Conference)

  7. Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement

    Office of Scientific and Technical Information (OSTI)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield MunicipalTechnical Report:Speeding accessby aLED Street LightingFrom theHighI _s - "U NMeasure

  8. Replaced M473, M0512, M0538, M0541

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal GasAdministration Medal01 Sandia4) August 20123/%2A en NNSAReference DocumentsM473,

  9. Applications of molecular replacement to G protein-coupled receptors

    Office of Scientific and Technical Information (OSTI)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield MunicipalTechnicalInformation4563AbuseConnectJournal Article:(Journalthedefectsresearch(Journal

  10. Exploring the speed and performance of molecular replacement with AMPLE

    Office of Scientific and Technical Information (OSTI)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfate Reducing(Journal Article) |production at a linear collider (Conference)(Journal Article) |using

  11. LED T8 Replacement Lamps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURING OFFICE INDUSTRIALU.S. DepartmentJeanKeyLANL SustainableRoadway Lighting LEDLED T8

  12. Do You Have Windows That Need Replacing? | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based| Department8,Department of Energy2EM'sReportOctober 2015Drive a

  13. Simple Maintenance Saves Costly Furnace Repair/Replacement | Department of

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLE DIRECTIVES Pursuant toPower Wind Awards | Department

  14. Replacement-1 Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested

  15. Jordan Malheur Resource Area Jonesboro Diversion Dam Replacement FONSI 1

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties - WAPA Public CommentInverted Attic9: JohnofReactoron notice Jordan

  16. Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematics And Statistics » USAJobs SearchAMERICA'S FUTURE.Projects at Armyusing Fueleffective

  17. Window Replacement, Rehabilitation, & Repair Guides - Building America Top

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OFAMERICA'S FUTURE.Energy Wind Power Today, 2010, WindWindof

  18. Building America Technology Solutions for New and Existing Homes: Replacing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram:Y-12Power, IncBioPredicting EnvelopeSiding RetrofitCeiling

  19. Duct Chase Sprinkler Replacement Project (4594), 5/31/2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submit theCovalentLaboratory |Sectorfor $1.14 Per GallonDataEnergyDuct Chase

  20. Magnetic Nanoparticle Capilary Flow as a Replacement for Lateral Flow

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACTThousandReport) |Administration Savannah RiverMagneticXSD-MM

  1. Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergy Webinar:I Due DateOpportunity | Department ofAprilEventsLab

  2. Compact Fluorescent Plug-In Ballast-in-a-Socket

    SciTech Connect (OSTI)

    Rebecca Voelker

    2001-12-21

    The primary goal of this program was to develop a ballast system for plug-in CFLs (compact fluorescent lamps) that will directly replace standard metal shell, medium base incandescent lampholders (such as Levition No. 6098) for use with portable lamp fixtures, such as floor, table and desk lamps. A secondary goal was to identify a plug-in CFL that is optimized for use with this ballast. This Plug-in CFL Ballastin-a-Socket system will allow fixture manufacturers to easily manufacture CFL-based high-efficacy portable fixtures that provide residential and commercial consumers with attractive, cost-effective, and energy-efficient fixtures for use wherever portable incandescent fixtures are used today. The advantages of this proposed system over existing CFL solutions are that the fixtures can only be used with high-efficacy CFLs, and they will be more attractive and will have lower life-cycle costs than screw-in or adapter-based CFL retrofit solutions. These features should greatly increase the penetration of CFL's into the North American market. Our work has shown that using integrated circuits it is quite feasible to produce a lamp-fixture ballast of a size comparable to the current Edison-screw 3-way incandescent fixtures. As for price points for BIAS-based fixtures, end-users polled by the Lighting Research Institute at RPI indicated that they would pay as much as an additional $10 for a lamp containing such a ballast. The ballast has been optimized to run with a 26 W amalgam triple biax lamp in the base-down position, yet can accept non-amalgam versions of the lamp. With a few part alterations, the ballast can be produced to support 32 W lamps as well. The ballast uses GE's existing L-Comp[1] power topology in the circuit so that the integrated circuit design would be a design that could possibly be used by other CFL and EFL products with minor modifications. This gives added value by reducing cost and size of not only the BIAS, but also possibly other integral CFL and future dimmable integral and plug-in versions of the EFL products.

  3. General Service LED Lamps

    Broader source: Energy.gov [DOE]

    A U.S. DOE SSL technology fact sheet that compares general service LED light bulbs with incandescent and CFL bulbs.

  4. Healthcare Energy: Spotlight on Lighting and Other Electric Loads...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lighting and Other Electric Loads Healthcare Energy: Spotlight on Lighting and Other Electric Loads Compact fluorescent, light-emitting diode, and energy-saving incandescent light...

  5. Optimizing Energy Savings from Direct-DC in U.S. Residential Buildings

    E-Print Network [OSTI]

    Garbesi, Karina

    2012-01-01

    ballast fluorescent and LED lighting, which are DC- internalmotors [7]. Fluorescent and LED lighting uses one-quarter ofbest technology Lighting Incandescent, fluorescent, LED

  6. Fluorescent Lighting | Department of Energy

    Office of Environmental Management (EM)

    - by far the most common form of fluorescent lighting but rarely found in residential buildings -- are much more energy efficient than incandescent lamps and are ideally suited...

  7. Lesson 13, Section 2.2 Part 2

    E-Print Network [OSTI]

    B Compact ?uorescent lightbulbs (CFL) can be used to most places that conventional incandescent bulbs are, but use a ?'action of the electricity. This table lists.

  8. Lesson11.doc

    E-Print Network [OSTI]

    B Compact fluorescent lightbulbs (CFL) can be used to most places that conventional incandescent bulbs are, but use a fraction of the electricity. This table lists ...

  9. Radiative Heat Transfer in Enhanced Hydrogen Outgassing of Glass

    E-Print Network [OSTI]

    Kitamura, Rei; Pilon, Laurent

    2009-01-01

    with lamp heating than with furnace heating and (2) hydrogensilica tube and heated in a furnace or by an incandescentan incandescent lamp than within furnace. Here, sample and

  10. DOE Announces Selections for SSL Core Technology and Product...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    seeks to develop a small form factor retrofit lamp consisting of a light engine, optics, drive electronics, and thermal management. The lamp is suitable for incandescent or...

  11. Common Industrial Lighting Upgrade Technologies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    is used to regulate the ongoing electricity provided to the lamp. COMMON INDUSTRIAL LIGHTING UPGRADE TECHNOLOGIES Due to the phase-out of the incandescent bulb and magnetic...

  12. Optimizing Energy Savings from Direct-DC in U.S. Residential Buildings

    E-Print Network [OSTI]

    Garbesi, Karina

    2012-01-01

    motors [7]. Fluorescent and LED lighting uses one-quarter ofballast fluorescent and LED lighting, which are DC- internalbest technology Lighting Incandescent, fluorescent, LED

  13. Peering into a Quantum Well | U.S. DOE Office of Science (SC...

    Office of Science (SC) Website

    have unearthed droop's elusive cause, illuminating a key barrier to this potentially energy-saving alternative to conventional incandescent and fluorescent lighting. At issue,...

  14. Types of Lighting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    selection. Types of lighting include: Fluorescent Incandescent Outdoor solar Light-emitting diode (LED) Also learn how energy-efficient lightbulbs compare to traditional...

  15. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Scientific and Technical Information (OSTI)

    We then conducted a comparative LCA, looking at the impacts associated with the Philips Master LEDbulb and comparing those to a CFL and an incandescent lamp. The comparison...

  16. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Scientific and Technical Information (OSTI)

    Hollomon, Brad; Dillon, Heather E.; Snowden-Swan, Lesley J. LED; light-emitting diode; CFL; incandescent; halogen; lamp; bulb; TCLP; STLC; TTLC; WET; hazardous waste; electronic...

  17. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    National Laboratory (PNNL), Richland, WA (US)","USDOE","LED; light-emitting diode; CFL; incandescent; halogen; lamp; bulb; TCLP; STLC; TTLC; WET; hazardous waste; electronic...

  18. Understanding Drooping Light Emitting Diodes CEEM | U.S. DOE...

    Office of Science (SC) Website

    Impact Understanding "droop" may result in cheaper, more efficient LEDs; LEDs are more energy efficient, smaller, and longer-lived than incandescent lamps or fluorescent...

  19. National Electrical Manufacturers Association

    Broader source: Energy.gov (indexed) [DOE]

    for incandescent reflector lamps do not need to be amended and let the marketplace transition to more energy efficient lighting technologies combined with other regulatory...

  20. APPLIANCE STANDARDS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Equipment General Service Incandescent Lamps General Service Fluorescent Lamps Small Electric Motors Electric Motors Water Heaters Furnace Fans Distribution Transformers Water...

  1. CALiPER Retail Lamps Study 3

    SciTech Connect (OSTI)

    Royer, Michael P.; Beeson, Tracy A.

    2014-02-01

    The CALiPER program first began investigating LED lamps sold at retail stores in 2010, purchasing 33 products from eight retailers and covering six product categories. The findings revealed a fragmented marketplace, with large disparities in performance of different products, accuracy of manufacturer claims, and offerings from different retail outlets. Although there were some good products, looking back many would not be considered viable competitors to other available options, with too little lumen output, not high enough efficacy, or poor color quality. CALiPER took another look in late 2011purchasing 38 products of five different types from nine retailers and the improvement was marked. Performance was up; retailer claims were more accurate; and the price per lumen and price per unit efficacy were down, although the price per product had not changed much. Nonetheless, there was still plenty of room for improvement, with the performance of LED lamps not yet reaching that of well-established classes of conventional lamps (e.g., 75 W incandescent A19 lamps). Since the second retail lamp study was published in early 2012, there has been substantial progress in all aspects of LED lamps available from retailers. To document this progress, CALiPER again purchased a sample of lamps from retail stores 46 products in total, focusing on A19, PAR30, and MR16 lamps but instead of a random sample, sought to select products to answer specific hypotheses about performance. These hypotheses focused on expanding ranges of LED equivalency, the accuracy of lifetime claims, efficacy and price trends, as well as changes to product designs. Among other results, key findings include: There are now very good LED options to compete with 60 W, 75 W, and 100 W incandescent A19 lamps, and 75 W halogen PAR30 lamps. MR16 lamps have shown less progress, but there are now acceptable alternatives to 35 W, 12 V halogen MR16 lamps and 50 W, 120 V halogen MR16 lamps for some applications. Other uses, such as in enclosed luminaires, may require more development. At the same price point, lamps purchased in 2013 tended to have higher output and slightly higher efficacy than in 2011 or 2010. Over 30% of the products purchased in 2013 exceeded the maximum efficacy measured in 2011 (71 lm/W), with the most efficacious product measured at 105 lm/W. There appears to be increasing consistency in color quality, with a vast majority of products having a CCT of 2700 K or 3000 K and a CRI between 80 and 85. There were also fewer poor performing products tested and more high-performing products available in 2013 than in previous years. The accuracy of equivalency and performance claims was better than in 2011, but remains a concern, with 43% of tested products failing to completely meet their equivalency claim and 20% of products failing to match the manufacturer’s performance data. Although progress has been substantial, on average LED lamps remain more expensive than other energy efficiency lighting technologies -- although some aspects can be superior. Although not universal to all product lines or all product types, the issue of insufficient lumen output from LED lamps is waning. Thus, manufacturers can focus on other issues, such as reducing cost, improving electrical/dimmer compatibility, eliminating flicker, or improving color quality. While these issues are not inherent to all products, they remain a concern for the broader market.

  2. High Efficiency Integrated Package

    SciTech Connect (OSTI)

    Ibbetson, James

    2013-09-15

    Solid-state lighting based on LEDs has emerged as a superior alternative to inefficient conventional lighting, particularly incandescent. LED lighting can lead to 80 percent energy savings; can last 50,000 hours – 2-50 times longer than most bulbs; and contains no toxic lead or mercury. However, to enable mass adoption, particularly at the consumer level, the cost of LED luminaires must be reduced by an order of magnitude while achieving superior efficiency, light quality and lifetime. To become viable, energy-efficient replacement solutions must deliver system efficacies of ? 100 lumens per watt (LPW) with excellent color rendering (CRI > 85) at a cost that enables payback cycles of two years or less for commercial applications. This development will enable significant site energy savings as it targets commercial and retail lighting applications that are most sensitive to the lifetime operating costs with their extended operating hours per day. If costs are reduced substantially, dramatic energy savings can be realized by replacing incandescent lighting in the residential market as well. In light of these challenges, Cree proposed to develop a multi-chip integrated LED package with an output of > 1000 lumens of warm white light operating at an efficacy of at least 128 LPW with a CRI > 85. This product will serve as the light engine for replacement lamps and luminaires. At the end of the proposed program, this integrated package was to be used in a proof-of-concept lamp prototype to demonstrate the component’s viability in a common form factor. During this project Cree SBTC developed an efficient, compact warm-white LED package with an integrated remote color down-converter. Via a combination of intensive optical, electrical, and thermal optimization, a package design was obtained that met nearly all project goals. This package emitted 1295 lm under instant-on, room-temperature testing conditions, with an efficacy of 128.4 lm/W at a color temperature of ~2873K and 83 CRI. As such, the package’s performance exceeds DOE’s warm-white phosphor LED efficacy target for 2013. At the end of the program, we assembled an A19 sized demonstration bulb housing the integrated package which met Energy Star intensity variation requirements. With further development to reduce overall component cost, we anticipate that an integrated remote converter package such as developed during this program will find application in compact, high-efficacy LED-based lamps, particularly those requiring omnidirectional emission.

  3. DUAL USE OF LEDS: SIGNALING AND COMMUNICATIONS IN ITS Grantham Pang, Chi-ho Chan, Hugh Liu, Thomas Kwan

    E-Print Network [OSTI]

    Pang, Grantham

    lights with LEDs is a reduction in power consumption [7]. In addition, incandescent traffic signals burn1 DUAL USE OF LEDS: SIGNALING AND COMMUNICATIONS IN ITS Grantham Pang, Chi-ho Chan, Hugh Liu of light-emitting diodes (LEDs) over incandescent lights is well-supported. This is due to their high

  4. Electrical modulation of emissivity S. Vassant,1

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    , it is difficult to develop an efficient light emitting diode because the spontaneous emission rate is proportional emitting diodes. Yet, incandescent sources are often the only option in the infrared (IR). Indeed tens of Hz. Hence, for many applications, incandescent light sources can- not compete with light

  5. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    No. 3. Recipient's Catalog No. 4. Title and Subtitle The Impact of the Conversion of Incandescent Cleburne Houston, Texas 77004 10. Work Unit No. (TRAIS) 11. Contract or Grant No. DTRT12-G-UTC06 12 the urban core. 17. Key Words Conversion, Incandescent Bulbs, LED Light 18. Distribution Statement

  6. IDS120h GEOMETRY WITH SHIELDING VESSELS ENERGY FLOW ANALYSIS

    E-Print Network [OSTI]

    McDonald, Kirk

    IDS120h GEOMETRY WITH SHIELDING VESSELS ENERGY FLOW ANALYSIS SHIELDING MATERIAL: 60% W + 40% He vs SHIELDING Nicholas Souchlas, PBL (10/18/2011) 1 #12;IDS120h with shielding vessels. # Different cases ENERGY CUTOFF >SHIELDING: 60% W + 40% He , 80% W + 20% He, 88% W + 12% He ( WITH W VESSELS) >4 MW proton

  7. IDS120h GEOMETRY WITH SHIELDING VESSELS ENERGY FLOW ANALYSIS CONTINUED

    E-Print Network [OSTI]

    McDonald, Kirk

    IDS120h GEOMETRY WITH SHIELDING VESSELS ENERGY FLOW ANALYSIS CONTINUED SHIELDING MATERIAL: 60% W with shielding vessels. # Different cases of shielding material. # N = 100,000 AND N = 500,000 events simulations CUTOFF >SHIELDING: 60% W + 40% He , 80% W + 20% He, 88% W + 12% He ( WITH W VESSELS) >4 MW proton beam

  8. Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

    2002-01-01

    Initial construction costs and net annual changes in operating and maintenance expenses are identified for the capital renovation project proposed by Edinburg Irrigation District Hidalgo County No. 1 to the North American Development Bank (NADBank...

  9. Energy-Efficient, High-Color-Rendering LED Lamps Using Oxyfluoride and Fluoride Phosphors

    SciTech Connect (OSTI)

    Setlur, A.; Radkov, E; Henderson, C; Her, J; Srivastava, A; Karkada, N; Kishore, M; Kumar, N; Aesram, D; et al.

    2010-01-01

    LED lamps using phosphor downconversion can be designed to replace incandescent or halogen sources with a 'warm-white' correlated color temperature (CCT) of 2700-3200 K and a color rendering index (CRI) greater than 90. However, these lamps have efficacies of {approx}70% of standard 'cool-white' LED packages (CCT = 4500-6000 K; CRI = 75-80). In this report, we describe structural and luminescence properties of fluoride and oxyfluoride phosphors, specifically a (Sr,Ca){sub 3}(Al,Si)O{sub 4}(F,O):Ce{sup 3+} yellow-green phosphor and a K{sub 2}TiF{sub 6}:Mn{sup 4+} red phosphor, that can reduce this gap and therefore meet the spectral and efficiency requirements for high-efficacy LED lighting. LED lamps with a warm-white color temperature (3088 K), high CRI (90), and an efficacy of {approx}82 lm/W are demonstrated using these phosphors. This efficacy is {approx}85% of comparable cool-white lamps using typical Y{sub 3}Al{sub 5}O{sub 12}:Ce{sup 3+}-based phosphors, significantly reducing the efficacy gap between warm-white and cool-white LED lamps that use phosphor downconversion.

  10. High dynamic range measurement of spectral responsivity and linearity of a radiation thermometer using a super-continuum laser and LEDs

    SciTech Connect (OSTI)

    Yoo, Y. S.; Lee, D. H.; Park, C. W.; Park, S. N. [Korea Research Institute of Standards and Science 209 Gajeong-Ro, Yuseong-Gu, Daejon 305-340 (Korea, Republic of)] [Korea Research Institute of Standards and Science 209 Gajeong-Ro, Yuseong-Gu, Daejon 305-340 (Korea, Republic of)

    2013-09-11

    To realize the temperature scale above the freezing point of silver according to the definition of ITS-90, the dynamic range of the spectral responsivity is one of the most important factors which limit its uncertainty. When the residual spectral response at both side bands of a spectral band is not negligible, a significant uncertainty can be caused by a low dynamic range of the spectral responsivity measurement. In general, incandescent lamps are used to measure the spectral responsivity and the linearity. The dynamic range of the spectral responsivity measurement is often limited by a trade-off with the desired spectral resolution, which is less than 6 decades. Nonlinearity is another limiting fact of uncertainties of the temperature scale. Tungsten lamps have disadvantage in the nonlinearity measurements in terms of adjustability of radiance level and spectral selectivity. We report spectral responsivity measurements of which the measurable dynamic range is enhanced 50 times after replacing a QTH lamp with a super continuum laser. We also present a spectrally selected linearity measurement over a wide dynamic range using high-brightness light emitting diode arrays to observe a slight saturation of linearity.

  11. Fourteen Points for Energy Conservation in Lighting 

    E-Print Network [OSTI]

    Zekowski, G.

    1979-01-01

    are the approximate lumen output of various lamp types: Incandescent - 17 lumens per watt; mer cury-vapor - 55 lumens per watt; fluorescent - 65 lumens per watt; metal hal ide - 95 lumens per watt; and hi pressure sodium - 120 lumens per watt. As an example, using... a low 4?/Kw, ten hours per day, you can save: $10 per year using 1-32 watt fluorescent rather than 2-60 watt incandescents. Or $33 per year by using 1-40 watt fluorescent rather than 4-60 watt incandescents. Or $33 per year using 1-175 watt mercury...

  12. An Archaeological Survey of the City of Lufkin AC Waterline Replacement in Central Angelina County, Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-06-11

    of the Texas Historical Commission, Archeology Division, was the reviewer for this project. John E. Ippolito, Forest Service Archeologist, Lufkin Office, shared his knowledge of the potential for archaeological sites in the projec t area; I am grateful.... Elevation ranges from about 100 feet in the so uth near the Nueces River to about 460 feet in the northern part of the county. Angelina County is in the East Texas Timberlands Land Resource Area and forest products are a major part of the local economy...

  13. [Minor revisionposted 11/28/12 (replaces 12/17/07 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    human blood. b. "Bloodborne pathogens" means pathogenic microorganisms that are present in human blood and Procedure OP 60.24: Bloodborne Pathogen Protection Program DATE: November 28, 2012 PURPOSE: The purpose of this Operating Policy/Procedure (OP) is to protect workers from anticipated exposure to bloodborne pathogens

  14. [Moderate revisionposted 3/18/13 (replaces 12/4/08 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    when using toxic or hazardous chemicals, pathogenic microorganisms, or radioisotopes in certain forms. Functions of Exhaust Systems Operations involving hazardous chemicals, pathogenic microorganisms pathogenic microorganisms will be fitted with HEPA filters to entrap these particles and prevent

  15. Effects of Ge replacement in GeTe by [Ag+Sb] on thermoelectric...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in GeTe by Ag+Sb on thermoelectric properties and NMR spectra Requirements for student: general physics and chemistry courses, and desire to work in experimental laboratory. This...

  16. [Minor revisionposted 11/20/12 (replaces 10/6/05 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    or containing residual or stored energy. h. Energy Source - Any source of electrical, mechanical, hydraulic energization or start-up of machines and equipment or release of stored energy where repairs and/or maintenance of Federal Regulations, 1910.147, "The Control of Hazardous Energy (Lockout/Tagout)," and the Accident

  17. [Minor revisionposted 4/29/15 (replaces 9/10/12 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    the provision of the goods or services. At fiscal year end, all final transactions for the fiscal year must be completed no later than month end close for August, as all activity must be billed in the same fiscal year information: (a) The service center or support activity FOP that will receive revenue; (b) Names and e

  18. [Major revisionposted 12/19/13 (replaces 3/24/10 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    divisions of Texas Tech University by graduation from an accredited high school, by transfer from have little chance of successfully completing degrees at Texas Tech University, class rank in high-supported institution, Texas Tech University recognizes its responsibility to provide excellent educational

  19. [Minor revisionposted 1/30/15 (replaces 8/24/10 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    of a position, as determined by Human Resources, are not eligible for an educational incentive pay increase. #12 OP 70.18: Educational Incentive Pay DATE: January 30, 2015 PURPOSE: The purpose of this Operating Policy/Procedure (OP) is to establish university policy related to educational incentive pay awarded

  20. [Major revisionposted 2/21/14 (replaces 11/14/05 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    directly to the employee by someone other than the university. c. Travel advances are allowed for prepaid of the travel application and proof of payment of the prepaid expense. d. Advances for non-prepaid expenses may for non-prepaid expenses are restricted as follows: #12;February 21, 2014 Page 2 OP 79.07 (1) Airfare cost

  1. Reuse Distance Based Circuit Replacement in Silicon Photonic Interconnection Networks for HPC

    E-Print Network [OSTI]

    Bergman, Keren

    -scale distance, can help to further scale data-movement capabilities in high performance computing (HPC demands within high performance computing (HPC) systems. Silicon photonic (SiP) interconnects [1-3], which

  2. Water/Wastewater Engineering Report (High Efficiency Pump/Motor Replacement - M2 Model) 

    E-Print Network [OSTI]

    Liu, Z.; Brumbelow, K.; Haberl, J. S.

    2006-10-30

    primarily addresses electric motor-driven pumps, and does not include the pumps driven with gasoline or diesel engines....

  3. Emerging Trends in Heart Valve Engineering: Part II. Novel and Standard Technologies for Aortic Valve Replacement

    E-Print Network [OSTI]

    2015-01-01

    et mechanical heart valves during the leakage phase. Ann.leakage ?ow in the hinge of a st. Jude medical((r)) regent mechanical heart valve.

  4. Emerging Trends in Heart Valve Engineering: Part III. Novel Technologies for Mitral Valve Repair and Replacement

    E-Print Network [OSTI]

    2015-01-01

    et mechanical heart valves during the leakage phase. Ann.leakage ?ow in the hinge of a St. Jude medical((r)) regent mechanical heart valve.leakage ?ow of regurgitation jets, 22,28 ori?ces, 23 and at the hinges 36 of mechanical valves.

  5. Management of Replacement Heifers for a High Reproductive and Calving Rate. 

    E-Print Network [OSTI]

    Beverly, John R.; Spitzer, John C.

    1980-01-01

    The scientific design and management of a modern irrigation system requires that the designer or manager have knowledge of site and plant criteria such as infiltration, drainage, soil fertility, plant water needs, and plant ...

  6. Can laser selffocusing in air replace interferometer siderostats and delay lines?

    E-Print Network [OSTI]

    Ribak, Erez

    experiments in high-power lasers show that they modulate of the density of air at long ranges, up, depending on the laser power. Two such laser-heated volumes can scatter stellar light into a central station, where they are made to interfere in speckled fringes. Usually the density modulations deflect the light

  7. > REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) industrial automation

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    -- Fieldbus technology in industrial automation is not only relatively complex because of the number in the industrial automation systems. Once their products were developed, they pushed to have them standardized on the applications. This article traces this technology from its beginnings, which go back to the first industrial

  8. Stainless steel replaces platinum to produce hydrogen Friday, March 13, 2009

    E-Print Network [OSTI]

    voltage of 0.6 volts, the researchers produced about 5.5 amps per cubic foot using the stainless steel brush manufacturing machine. At an inch in length and an inch in diameter, the brushes had 48 square materials, a small amount of electrical energy is needed. While the electrolysis cells will produce more

  9. LETTER doi:10.1038/nature09964 Improved molecular replacement by density-and

    E-Print Network [OSTI]

    Baker, David

    structure optimization Frank DiMaio1 , Thomas C. Terwilliger2 , Randy J. Read3 , Alexander Wlodawer4

  10. Conifer regeneration in stand-replacement portions of a large mixed-severity wildfire in the

    E-Print Network [OSTI]

    Turner, Monica G.

    ` texture grossie`re supportaient des densite´s moins e´leve´es (133 semisÁha­1) que les sols a` texture

  11. [Minor revisionposted 10/8/13 (replaces 11/21/08)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    to an employee's personal residence or other like property to accomplish university work on business "at home://www.depts.ttu.edu/procurement/inventory/documents/Temporary%20Use%20Form.xls. 5. Telephones Directory Assistance, TEX-AN, WATS, and Direct Dial 1+ and 0+ personal calls are not authorized over university telephone system. Any person placing emergency directory

  12. How well can the combination of hlSST and SLR replace GRACE?

    E-Print Network [OSTI]

    Stuttgart, Universität

    30.09.2014 8 #12;Post-processing: old approach · Kalman filtering ­ allows to handle small numbers CSR Gaussian filtering with 750km #12;30.09.2014 19 Amazon Annual signal #12;HYDROLOGY AND HYDRO;30.09.2014 23 GRACE hlSST & SLR Hydro-meteorological validation: ·Q - R 180 W 135 W 90 W 45 W 0 45 E 90 E 135 E

  13. [Minor revisionposted 1/21/15 (replaces 2/25/11 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    termination. Violations may be reported to the appropriate local, state, and/or federal authorities. 1

  14. Is it Cost-Effective to Replace Old Eddy-Current Drives?

    SciTech Connect (OSTI)

    Not Available

    2008-07-01

    This is one in a series of tip sheets to help manufacturers optimize their industrial motor and motor-driven systems.

  15. Vitamin B12 Replacement Therapy and Its Rehabilitative Effects on Psychiatric and Neurologic Symptoms

    E-Print Network [OSTI]

    Amador, Nelly

    1998-01-01

    Lou,W. Prevalence of Vitamin B12 Deficiency Among GeriatricS. , Takashi, K. Yamada, M. Vitamin B12 levels in serum andDementia Caused by Vitamin B12 Deficiency. Journal of

  16. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    SciTech Connect (OSTI)

    Stephens, Jessica D.

    2013-05-29

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

  17. Replacing standard dairy produce by low saturated fat equivalents is one of the usual

    E-Print Network [OSTI]

    Boyer, Edmond

    in the dairy protein intake. To test the influence of dairy pro- tein on cholesterol metabolism, we submit- ted by density gradient ultracentrifuga- tion. Body weight and food intake remained constant throughout the study

  18. [Minor revisionposted 4/1/14 (replaces 6/20/12 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    Revenue Code (IRC)]. c. In addition to payment for tuition and fees, the scholarship or fellowship grant amount received in the nature of a family allowance [§ 1.117-3 (d), IRC]. d. Candidate for a degree or universities [§ 1.117-3 (e), IRC]. e. Award ­ Payment for recognition of a special achievement, skill

  19. Microscale wear behavior and crosslinking of PEG-like coatings for total hip replacements

    E-Print Network [OSTI]

    Kane, Sheryl R.; Ashby, Paul D.; Pruitt, Lisa A.

    2010-01-01

    In contrast, the 40°C coatings were much more wear-and tribology of PEG-like coatings on UHMWPE for total hiphydrated polymer-on-polymer coatings. J Biomed Mater Res B.

  20. [Minor revisionposted 10/29/12 (replaces 12/10/08 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    to shut down any work area in which there is an unsafe and/or unauthorized usage condition present. 4 Safety Officer Office phone: 742-3876 c. Texas Department of State Health Services 24-hour emergency

  1. An assessment of alternatives and technologies for replacing ozone- depleting substances at DOE facilities

    SciTech Connect (OSTI)

    Purcell, C.W.; Miller, K.B.; Friedman, J.R.; Rapoport, R.D.; Conover, D.R.; Hendrickson, P.L.; Koss, T.C.

    1992-10-01

    Title VI of the Clean Air Act, as amended, mandates a production phase-out for ozone-depleting substances (ODSs). These requirements will have a significant impact on US Department of Energy (DOE) facilities. Currently, DOE uses ODSs in three major activities: fire suppression (halon), refrigeration and cooling (chlorofluorocarbons [CFCs]), and cleaning that requires solvents (CFCs, methyl chloroform, and carbon tetrachloride). This report provides basic information on methods and strategies to phase out use of ODSs at DOE facilities.

  2. Are Live Ultrasound Models Replaceable? Traditional versus Simulated Education Module for FAST Exam

    E-Print Network [OSTI]

    Bentley, Suzanne; Mudan, Gurpreet; Strother, Christopher; Wong, Nelson

    2015-01-01

    of Emergency Physicians. ACEP emergency introduction of anof Emergency Physician (ACEP) ultrasound questions andof questions from the ACEP ultrasound question bank, a

  3. Innovative Approach to Chiller Replacement at Lafayette General Medical Center Located in Lafayette, Louisiana 

    E-Print Network [OSTI]

    Poche', J. M.; Broussard, J. P.

    1998-01-01

    central plant or HVAC systems. In 1983, utilizing a combination of financing methods including U.S. Department of Energy ("DOE") grants, the Hospital initiated a comprehensive Facility Energy, Operations and Utilization Analysis Program. In that time...

  4. Global warming implications of non-fluorocarbon technologies as CFC replacements

    SciTech Connect (OSTI)

    Fischer, S.K.; Tomlinson, J.J.

    1993-12-31

    Many technologies could be developed for use in place of conventional compression systems for refrigeration and air conditioning. Comparisons of the global warming impacts using TEWI (Total Equivalent Warming Impact) can be used to identify alternatives that have the potential for lower environmental impacts than electric-driven vapor compression systems using HCFCs and HFCs. Some options, such as secondary heat transfer loops in commercial refrigeration systems to reduce refrigerant charge and emission rates, could be useful in reducing the losses of refrigerants to the atmosphere. Use of ammonia instead of a fluorocarbon in a system with a secondary loop offers only a small potential for decreasing TEWI, and this may not warrant the increased complexity and risks of using ammonia in a retail sales environment. A few technologies, such as adsorption heat pumps, have efficiency levels that show reduced TEWI levels compared to conventional and state of the art compression systems, and further development could lead to an even more favorable comparison. Health and safety risks of the alternative technologies and the materials they employ must also be considered.

  5. Electrophoretic detection and separation of mutant DNA using replaceable polymer matrices

    DOE Patents [OSTI]

    Karger, Barry L. (Newton, MA); Thilly, William G. (Winchester, MA); Foret, Frantisek (Malden, MA); Khrapko, Konstaintin (Brookline, MA); Koehavong, Phouthone (Pittsburgh, PA); Cohen, Aharon S. (Newton, MA); Giese, Roger W. (Quincy, MA)

    1997-01-01

    The disclosure relates to a method for resolving double-stranded DNA species differing by at least one base pair. Each of the species is characterized by an iso-melting domain with a unique melting temperature contiguous with a melting domain of higher thermal stability.

  6. Energy Policy 29 (2001) 11331143 Ethanol as a lead replacement: phasing out leaded gasoline in Africa

    E-Print Network [OSTI]

    Thomas, Valerie

    2001-01-01

    lead with ethanol using primarily their by-product molasses production include Zimbabwe, Kenya, Egypt proponents have typically focused on the benefits of ethanol in terms of greenhouse gas emissions, local

  7. [Minor revisionposted 5/5/14 (replaces 6/25/10 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    /chief financial officer. POLICY/PROCEDURE 1. Locations around campus shall be identified as "hazardous" in areas people/vehicles from parking in designated hazardous areas. 7. The Transportation & Parking Services) is to identify hazards associated with icing of university towers and guy-wires/cables, and to standardize

  8. [Minor revisionposted 11/20/12 (replaces11/28/07 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    equipment and hazardous noise areas and recommend appropriate posting; (2) Recommend engineering controls to hazardous noise; and to perform medical surveillance to ensure that occupationally induced hearing loss to their area, are followed; (2) Provide funds to purchase hearing protectors and to accomplish medical

  9. Why Insertion Turbine Meters are Replacing Orifice Plates for Steam Flow Measurement 

    E-Print Network [OSTI]

    Rusnak, J. J.

    1983-01-01

    when it was the best choice available. No area typifies this situation more than the problem of measuring steam flows. While the orifice has a number of draw back for steam flow measurement, it is superior to the only alternative available (until...

  10. Gender Equity and Fertility in European Below-Replacement Fertility Countries: Poland and Estonia 

    E-Print Network [OSTI]

    Iwinska-Nowak, Anna Malgorzata

    2012-02-14

    Poland and Estonia. Additionally, it tests the relative importance of gender equity at the societal level and the level of the family, contrasts the results of using different operationalizations of gender equity in the family, and compares the effects...

  11. Professional Human Capital Flows: Temporal Structure of Loss, Replacement and Contingent Bundling Effects on Firm Performance 

    E-Print Network [OSTI]

    Brymer, Rhett

    2012-10-19

    While resource based theory (RBT) addresses the importance of both possessing and orchestrating resources that have the potential of creating competitive advantage, it suggests little about the effects of unintentionally losing such resources...

  12. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings - Phase 1: Boiler Control Replacement and Monitoring

    SciTech Connect (OSTI)

    Dentz, J.; Henderson, H.

    2012-04-01

    The ARIES Collaborative, a Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, MA to implement and study improvements to the heating system in one of the non-profit's housing developments. The heating control systems in the 42-unit Columbia CAST housing development were upgraded in an effort projected to reduce heating costs by 15 to 25 percent.

  13. [Major revisionposted 10/18/13 (replaces 12/14/95 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    , charges are estimated, usually based on square footage. Rates for manufactured utilities such as steam of the actual or estimated charges for each type of utility used in a billing, or it may be an overall charge ­ In almost all buildings, electric consumption is metered by the building. All are charged the vendor rate

  14. Ways Electricity Can Be Used To Replace Fossil Fuels in The French Chemical Industry 

    E-Print Network [OSTI]

    Mongon, A.

    1982-01-01

    France energy policy for the year 1990 foresees the following breakdown between various energy sources : renewable sources (including hydraulic) : 11%, coal + natural gas : 30.5%, nuclear : 26.5%, oil : 32%. The electricity will be produced mainly...

  15. AEP (Central and SWEPCO)- Coolsaver A/C Tune Up or Replacement

    Broader source: Energy.gov [DOE]

    Participating customers are eligible to receive a $75 coupon for use toward A/C and heat pump efficiency services performed as a result of the program’s tune-up analysis, contractors are eligible...

  16. Replacing the Whole BarrelTo Reduce U.S. Dependence on Oil

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    gasoline. All feedstock wood comes from milling processes at UPM-Kymmene, a pulp and paper company. The pilot project is being conducted at the Gas Technology Institute's...

  17. Effects of caloric restriction during the growing period on the performance of egg type replacement stock 

    E-Print Network [OSTI]

    Deaton, James Washington

    1959-01-01

    respectively. At twelve, sixteen, and twenty oue weeks of age, fifty birds from each 100 bird replicate were weighed individually. Table 6 shows the average body weight for each treatment replicate for the 12, 16, end 21 week periods end the comMned mens... consistently consumed more feed and gained more weight. Tlxe total feed conxxumd for tom'. fall hatched birds vas 18. 27 pounds average pez bird compared to 15. N pounds fcr the spring hatched birds with the faU. hatched pglaca aaaragisg 6. 185$ gaaag...

  18. Black Bear Prep plant replaces high-frequency screens with fine wire sieves

    SciTech Connect (OSTI)

    Barbee, C.J.; Nottingham, J.

    2007-12-15

    At the Black Bear prep plant (near Wharncliffe, WV, USA) the clean coal from the spirals traditionally reported to high-frequency screens, which removed high-ash clay fines. Screens have inherent inefficiencies that allow clean coal to report to the screen underflow. The goal of this project was to capture the maximum amount of spiral clean coal while still removing the high-ash clay material found in the spiral product. The reduction of the circulating load and plant downtime for unscheduled maintenance were projected as additional benefits. After the plant upgrade, the maintenance related to the high frequency screens was eliminated and an additional 2.27 tons per hour (tph) of fine coal was recovered, which resulted in a payback period of less than one year. The article was adapted from a paper presented at Coal Prep 2007 in April 2007, Lexington, KY, USA. 1 ref., 1 fig., 1 tab.

  19. `A Literal Necessity to be Re-Placed': A Rejoinder to the Gentrification Debate

    E-Print Network [OSTI]

    Orleans City Council voted in favour of the US Department of Housing and Urban Development's (HUD) HOPE VI

  20. [Major revisionposted 9/5/13 (replaces 4/26/12 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    by the vice chancellor for institutional advancement (VCIA). Changes will be made with the concurrence by a potential donor who is either a foreign source or a representative of a foreign source must immediately contact the VCIA with the following information about the potential gift: a. Name of the donor; b. Value

  1. Novel Synthetic Medea Selfish Genetic Elements Drive Population Replacement in Drosophila; a Theoretical Exploration of Medea-

    E-Print Network [OSTI]

    Hay, Bruce A.

    biology, maternal effect, gene drive, mosquito, dengue, malaria Insects act as vectors for a number); dengue, yellow fever, lymphatic filariasis, chikungunya, and Chagas disease (humans); Rift valley fever

  2. [Major revisionposted 11/22/13 (replaces 2/18/11 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    by the managing director of Sponsored Programs Accounting and Reporting (SPAR) and the senior associate vice, terms and conditions of the award, and TTU provisions. 5. Risk Assessment ORS and SPAR review A-133

  3. [Major revisionposted 2/21/13 (replaces 7/24/08 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    period. d. Award and budget information is provided to Sponsored Projects Accounting and Reporting (SPAR for approval. e. Quarterly, SPAR will provide ORS a report of expenditures on advance FOPs. ORS will follow up

  4. [Minor revisionposted 10/2/13 (replaces 2/28/12 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    Accounting and Reporting (SPAR) and the senior associate vice president for research with substantive the revenue payments received by the sponsor at the time the award is closed. 3. Account Closeout SPAR will monitor project end dates for fixed price agreements on a monthly basis. As projects end, SPAR

  5. [Moderate revisionposted 2/4/15 (replaces 3/26/12 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    of Cabling in Buildings and Tunnels. 3. Per Texas statutes, TTU information resources1 are strategic assets. 6. All eCommerce solutions are required to use institutional payment gateways and are subject

  6. To what extent can the term ‘causes’ usefully be replaced by the term ‘is’? 

    E-Print Network [OSTI]

    Donnelly, Stephen Philip

    2011-11-23

    Considers whether the relationship that holds between cause and effect is that of identity over time....

  7. [Minor revision12/15/14 (replaces 3/26/13 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    with disabilities the opportunity to participate fully in all institutional programs and activities. Texas Tech or exceed the new construction and alterations requirements of Title III of the Americans with Disabilities Act. Texas Tech University is compliant with these regulations. b. Texas Tech University provides

  8. [Minor revisionposted 12/4/13 (replaces 4/2/13 edition) Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    training every two years. New benefits-eligible staff employees are required to complete the Texas Tech and development, and to provide information on employees enrolling for courses and attending classes at Texas Tech. General Policy Texas Tech is an institution of higher education dedicated to the pursuit of educational

  9. Registrar Diploma Request for a $50 Replacement Diploma Refm102dp20140918

    E-Print Network [OSTI]

    Lightsey, Glenn

    Information. The Texas Public Information Act, with a few exceptions, gives you the right to be informed about the information that the University of Texas at Austin collects about you. It also gives you the right to request'l priority Fed EX Express Saver/Int'l Economy We will use above Credit card information for billing

  10. Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011

    Office of Energy Efficiency and Renewable Energy (EERE)

    This paper discusses the so-called “coal train wreck” which may afford an opportunity to modernize our electric utility regulations to reflect a new century of different economic and energy markets...

  11. Emerging Trends in Heart Valve Engineering: Part III. Novel Technologies for Mitral Valve Repair and Replacement

    E-Print Network [OSTI]

    2015-01-01

    Van Nooten, G. J. , F. Caes, K. Francois, Y. Van Belleg-Belleghem, K. Franc¸ois, F. Caes, G. Vandenplas, M. De Pauw,

  12. Emerging Trends in Heart Valve Engineering: Part II. Novel and Standard Technologies for Aortic Valve Replacement

    E-Print Network [OSTI]

    2015-01-01

    Van Nooten, G. J. , F. Caes, K. Francois, Y. Van Belleg-Belleghem, K. Franc¸ois, F. Caes, G. Vandenplas, M. De Pauw,

  13. Mineral replacement rate of olivine by chrysotile and brucite under high1 alkaline conditions2

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    that could possibly contribute to reduce51 carbon dioxide emissions. Geological sequestration and ex including chrysotile [15­18]. Serpentine minerals are49 also crucial for sequestration of CO2 due to its availability and sequestration capacity [19­21].50 Indeed a lot of studies are looking for technologies

  14. How to Test Hypotheses When Exact Values are Replaced by Intervals to Protect Privacy: Case of

    E-Print Network [OSTI]

    Kreinovich, Vladik

    .g., [6]. All versions of the t-test are based on sample means X = 1 nx · nx i=1 xi and Y = 1 ny · ny i=1 yi and sample variances s2 X = 1 nx - 1 · nx i=1 (xi - X)2 and s2 Y = 1 ny - 1 · ny i=1 (yi - Y )2 : · For testing that the actual mean µ is µ0, we use t = X - µ0 sX/ nx . · For testing that the means are equal

  15. Refined coconut oil as a source of dietary fat in a milk replacer for dairy calves 

    E-Print Network [OSTI]

    Barsales, Petronilo Bringuel

    1964-01-01

    SR OLINF OalFOO Fattoallo O, Oataalaa ayFtooat aa to ac@la aad aesaaa tFs Chairoas of Ooeaalttao / i ~( Member Member : K I&i' &. . why P. " ~ w '~m . ~JHLF lt 'I s ~, I 'I I . jI :4:& ~+ 1 The eriCer ?iohoo te estese hio oisooeo... ~ SL OQgt Nl OWLO40lg ~ stet ~ 0 ~ Otteaosoo Sl QNN400 OLCOTT ~ ~ ~ ~ 1 ~ Iet otto ~ ~ ~ 0 ~ 0 ~ Ita ~ $4 y Ayd A Iy-h I I) 'IAA ' 4 44IAI. P' , t. , M-'i~'h Ig". i; 'j + $g ?':8 + W ?gled? - '?", 'P 'A4 '* A A I" ~ I I Ih 7 . ( t I A A A...

  16. Effects of dietary restriction during the growing period on the performance of egg type replacement stock 

    E-Print Network [OSTI]

    Ferebee, Douglas Clive

    1959-01-01

    Approved as to style and content by: hairman of Committee ead of Department August 1959 ACHNO'WMDG~~IHNTS Ths writer wishes to express his sincere appreciation to Dr. J. H. Quisenberry, Head oi' the Department of Poultry Science of the "exes... effect on sexual maturity and body weight. Singsen also reported that the season of hatoh had a significant effect on these characteristics. Although considerable research has been published on the use of restrictive i'eading throughout the United...

  17. > REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) networks

    E-Print Network [OSTI]

    Varvarigo, Emmanouel "Manos"

    . Index Terms-- Flexible Optical Networking, Optical OFDM, Energy Efficiency, Cost Analysis I are essential to achieve cost and energy efficiency. Additionally, the break-even cost of the flexible E the vision of spectrum-and-rate flexible networking. In [5] an excellent overview of the drivers

  18. Emerging Trends in Heart Valve Engineering: Part II. Novel and Standard Technologies for Aortic Valve Replacement

    E-Print Network [OSTI]

    2015-01-01

    et mechanical valves. J. Heart Valve Dis. 11:275–282, 2002.series of st. Jude medical heart valve: in vivo hemodynamicwith narrowed aortic annulus. J. Heart Valve Dis. 6:535–541,

  19. Percutaneous aortic valve replacement in a re-animated postmortem heart

    E-Print Network [OSTI]

    White, Jennifer; Sun, Amy; Killien, Lauren; Evangelista, Dennis

    2006-01-01

    transcatheter implantation of heart valve prosthesis for thein apex of post-mortem heart (lower view). B C A Figure 5A.descending aorta in lambs. Eur Heart J. 2002;23:1045-49. 5.

  20. DOI-BLM-OR-V040-2013-007-EA - Jonesboro Diversion Dam Replacement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Grant Right-of-Way 16 3.3.2 Impacts of Alternative 2: No Action Alternative 16 3.4 SOILS AND WATERSHED RESOURCES 17 3.4.1 Soils 17 3.4.2 Watershed Resources 17 3.4.3 Impacts...