Powered by Deep Web Technologies
Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

EIA Energy Efficiency-Table 4c. Capacity Adjusted Value of Production a by  

Gasoline and Diesel Fuel Update (EIA)

c c Page Last Modified: May 2010 Table 4c. Capacity Adjusted Value of Production 1 by Selected Industries, 1998, 2002, and 2006 (Billion 2000 Dollars 2) MECS Survey Years NAICS Subsector and Industry 1998 2002 2006 311 Food Manufacturing 432 459 487 312 Beverage and Tobacco Product Manufacturing 116 110 115 313 Textile Mills 55 52 42 314 Textile Product Mills 32 34 32 315 Apparel Manufacturing 67 53 31 316 Leather and Allied Product Manufacturing 11 8 6 321 Wood Product Manufacturing 88 95 98 322 Paper Manufacturing 172 163 160 323 Printing and Related Support Activities 107 106 99 324 Petroleum and Coal Products Manufacturing 221 241 254 325 Chemical Manufacturing 437 468 510 326 Plastics and Rubber Products Manufacturing 162 181 175

2

Optimal capacity adjustment for supply chain control  

E-Print Network (OSTI)

This research attempts to answer the questions involving the time and size of capacity adjustments for better supply chain management. The objective of this research is to analytically determine simple structures to adjust ...

Budiman, Benny S., 1969-

2004-01-01T23:59:59.000Z

3

Optimal Capacity Adjustments for Supply Chain Control  

E-Print Network (OSTI)

Decisions on capacity are often treated separately from those of production and inventory. In most situations, capacity issues are longer-term, so capacity-related decisions are considered strategic and thus not part of ...

Budiman, Benny

4

EIA Energy Efficiency-Table 3c. Capacity Adjusted Value of Production a by  

Gasoline and Diesel Fuel Update (EIA)

c c Page Last Modified: May 2010 Table 3c. Capacity Adjusted Value of Production 1 by Selected Industries, 1998, 2002, and 2006 (Current Billion Dollars) MECS Survey Years NAICS Subsector and Industry 1998 2002 2006 311 Food Manufacturing 430 468 552 312 Beverage and Tobacco Product Manufacturing 98 120 131 313 Textile Mills 57 50 44 314 Textile Product Mills 31 34 36 315 Apparel Manufacturing 66 53 31 316 Leather and Allied Product Manufacturing 11 8 7 321 Wood Product Manufacturing 87 94 110 322 Paper Manufacturing 159 160 177 323 Printing and Related Support Activities 104 109 107 324 Petroleum and Coal Products Manufacturing 134 215 523 325 Chemical Manufacturing 415 470 657 326 Plastics and Rubber Products Manufacturing 158 183 212 327 Nonmetallic Mineral Product Manufacturing 85 97 134

5

The optimal approach for parameter settings based on adjustable contracting capacity for the hospital supply chain logistics system  

Science Conference Proceedings (OSTI)

This paper establishes a simulation model for the supply chain of the hospital logistic system (SCHLS) based on the dynamic Taguchi method. The model derives optimal factor level combinations in the SCHLS setting when establishing adjustable contracting ... Keywords: Genetic algorithm (GA), Neural network (NN), Supply chain (SC), Taguchi method

Hung-Chang Liao; Hsu-Hwa Chang

2011-05-01T23:59:59.000Z

6

TID-4500, UC-4 C  

Office of Legacy Management (LM)

TID-4500, UC-4 C h e m i s t r y UCRL-51153 GAS ANALYSIS RESULTS FOR PROJECT RUL ISON PRODUCTION TESTING SAMPLES C. F. Smith, Jr. MS. date: N o v e m b e r 29, 1971 Contents...

7

Data:39095c6f-545f-4c68-a013-6934aed79f5d | Open Energy Information  

Open Energy Info (EERE)

f-545f-4c68-a013-6934aed79f5d f-545f-4c68-a013-6934aed79f5d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cotton Electric Coop, Inc Effective date: 2010/02/01 End date if known: Rate name: Commercial Service-Three Phase Sector: Commercial Description: * Available for commercial customers up to 50 kVA of transformer capacity. Further capacity available at the discretion of the Cooperative, up to 150 kVA. Subject to power cost adjustment and tax adjustment Source or reference: ISU Documentation Rate Binder Kelly # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

8

4C Offshore Limited | Open Energy Information  

Open Energy Info (EERE)

4C Offshore Limited 4C Offshore Limited Jump to: navigation, search Name 4C Offshore Limited Place Suffolk, United Kingdom Country United Kingdom Product Project planning, consulting for offshore industries (wind, oil, gas) Year founded 2009 Company Type For Profit Company Ownership Private Small Business No Affiliated Companies 4C Offshore Limited Technology Offshore Wind Phone number +44 (0)1502 509260 Website http://www.4coffshore.com/ References 4C Offshore website[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. 4C Offshore Limited is a company based in Suffolk, United Kingdom. 4C Offshore is an independent marine consulting firm, that provides advice and consulting services in offshore development, particularly renewables and

9

Data:82d535e4-c2ee-45f2-a514-e1e2dafa8c68 | Open Energy Information  

Open Energy Info (EERE)

5e4-c2ee-45f2-a514-e1e2dafa8c68 5e4-c2ee-45f2-a514-e1e2dafa8c68 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oregon Trail El Cons Coop, Inc Effective date: 2011/10/01 End date if known: Rate name: Small Commercial, Schedule G1 Sector: Commercial Description: Available in OTEC service territory for non-residential service requiring 50 kVA or less of transformer capacity, subject to policies as established by the Board of Directors. Power cost adjustment: The power cost adjustment will follow Bonneville Power Administration's (BPA) temporary charges to OTEC as they adjust their wholesale rates up or down through BPA's Cost Recovery Adjustment Clauses (CRAC). The power cost adjustment will also include future price increases in the cogeneration power purchase contracts.

10

Behavior of Irradiated B4C  

Science Conference Proceedings (OSTI)

A project sponsored by the Nuclear Fuel Industry Research (NFIR) Group was conducted to evaluate the behavior of irradiated B4C absorber material from LWR control components that had been discharged after having reached a relatively high exposure. Vibratory compacted B4C powder from a Vermont Yankee BWR control blade was examined after reaching a maximum local B-10 depletion of 70%. Hot pressed B4C pellets from a Maine Yankee PWR control rod were examined after ...

1986-06-01T23:59:59.000Z

11

AOCS Official Method S 4c-64  

Science Conference Proceedings (OSTI)

Methods for Testing Fatty Quaternary Ammonium Chlorides AOCS Official Method S 4c-64 Methods Downloads Methods Downloads DEFINITION SCOPE Fatty quaternary ammonium chlorides a

12

Climate Zone 4C | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Climate Zone 4C Jump to: navigation, search A type of climate defined in the ASHRAE 169-2006 standard consisting of Climate Zone Number 4 and Climate Zone Subtype C. Climate Zone 4C is defined as Mixed - Marine with IP Units 3600 < HDD65ºF ≤ 5400 and SI Units 2000 < HDD18ºC ≤ 3000 . The following places are categorized as class 4C climate zones: Benton County, Oregon Clackamas County, Oregon Clallam County, Washington Clark County, Washington Clatsop County, Oregon Columbia County, Oregon Coos County, Oregon Cowlitz County, Washington Curry County, Oregon Douglas County, Oregon

13

Estuarine Adjustment  

Science Conference Proceedings (OSTI)

Subtidal adjustment of estuarine salinity and circulation to changing river flow or tidal mixing is explored using a simplified numerical model. The model employs tidally averaged, width-averaged physics, following Hansen and Rattray, extended to ...

Parker MacCready

2007-08-01T23:59:59.000Z

14

Data:Da62642a-729c-4c5c-9850-669cb6c3c4c5 | Open Energy Information  

Open Energy Info (EERE)

Da62642a-729c-4c5c-9850-669cb6c3c4c5 Da62642a-729c-4c5c-9850-669cb6c3c4c5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbus Southern Power Co Effective date: 2012/03/09 End date if known: Rate name: Interruptible Power - Discretionary(primary voltage)-supplemental interruptions Sector: Industrial Description: Service pursuant to this schedule is available to customers that have provided reasonable evidence to the Company that their electric service can be interrupted within a 10-minute notice period. Customers shall contract for electrical capacity sufficient to meet normal maximum requirements but not

15

Data:719868b8-39c1-4777-a2e0-df4c57e4c490 | Open Energy Information  

Open Energy Info (EERE)

8b8-39c1-4777-a2e0-df4c57e4c490 8b8-39c1-4777-a2e0-df4c57e4c490 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconto Falls Water & Light Comm Effective date: 2007/10/13 End date if known: Rate name: Ms-1 Street and Yard Lighting Service Overhead 120 W IND Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0847 per kilowatt-hour.

16

Data:0a0c2b69-b10c-4c4c-aed2-059dd0baf5fb | Open Energy Information  

Open Energy Info (EERE)

b69-b10c-4c4c-aed2-059dd0baf5fb b69-b10c-4c4c-aed2-059dd0baf5fb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service between over 1,000kW Demand Transformer Ownership Discount-Net Energy Billing(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0509 per kilowatt-hour.

17

Data:11398f25-15eb-4c96-b0b0-c047f26167d9 | Open Energy Information  

Open Energy Info (EERE)

f25-15eb-4c96-b0b0-c047f26167d9 f25-15eb-4c96-b0b0-c047f26167d9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Edgecombe-Martin County E M C Effective date: 2006/08/01 End date if known: Rate name: GENERAL SERVICE Three Phase( with Small Renewable Generation Rider) Sector: Commercial Description: AVAILABILITY: Electric service is available under this Schedule in the territory served by the Cooperative for nonresidential use with less than 100 kVA of transformer capacity. Resale and standby services are not permitted. Rates are subject to wholesale power cost adjustments, power factor adjustments,a North Carolina Sales Tax and Rider EE (Energy Efficiency Rider).

18

Data:3f34395b-d679-4baa-814c-e4c1ae445c8c | Open Energy Information  

Open Energy Info (EERE)

b-d679-4baa-814c-e4c1ae445c8c b-d679-4baa-814c-e4c1ae445c8c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Large Power Wholesale Plus-LP4,Primary Service Delivery Sector: Commercial Description: - Available to customers with installed capacity of 5000kW or greater of demand per month with service under term contract . - Subject to Power Factor adjustment. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

19

Data:46162d74-c1d2-4c45-9628-837a8408afd1 | Open Energy Information  

Open Energy Info (EERE)

d74-c1d2-4c45-9628-837a8408afd1 d74-c1d2-4c45-9628-837a8408afd1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2001/11/01 End date if known: Rate name: LARGE POWER SERVICE - Schedule LP-3 - Secondary Sector: Industrial Description: This schedule applies to all large power customers where actual demand has exceeded one thousand kilowatts three times or more within the preceding twelve months or where installed capacity serving a customer at a single, contiguous site is 2500 kilovolt-amperes (KVA) or greater. Heavy Load Period Demand Charges: The maximum billing occurring during the hours of 7 a.m. through 12 noon, Monday through Saturday, after adjustment for power factor.

20

Data:4c573e38-e875-4c9f-acf8-8d6589d2e6fd | Open Energy Information  

Open Energy Info (EERE)

e38-e875-4c9f-acf8-8d6589d2e6fd e38-e875-4c9f-acf8-8d6589d2e6fd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Plymouth, Wisconsin (Utility Company) Effective date: 2011/12/22 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Secondary Voltage Service Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0774 per kilowatt-hour.

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Data:1cf4c295-a7b7-4047-8270-b4c2c8585ea1 | Open Energy Information  

Open Energy Info (EERE)

5-a7b7-4047-8270-b4c2c8585ea1 5-a7b7-4047-8270-b4c2c8585ea1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lake Mills Light & Water Effective date: 2009/06/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand 7am-9pm Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0767 per kilowatt-hour.

22

Archive Reference Buildings by Climate Zone: 4C Seattle, Washington |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

C Seattle, Washington C Seattle, Washington Archive Reference Buildings by Climate Zone: 4C Seattle, Washington Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is available for reference. Current versions are also available. You can download ZIP files that contain the following: An EnergyPlus software input file (.idf) An html file showing the results from the EnergyPlus simulation (.html) A spreadsheet that summarizes the inputs and results for each location (.xls) The EnergyPlus TMY2 weather file (.epw). benchmark-v1.0_3.0-4c_wa_seattle.zip benchmark-v1.1_3.1-4c_usa_wa_seattle.zip benchmark-new-v1.2_4.0-4c_usa_wa_seattle.zip More Documents & Publications

23

Data:62875665-3260-4c9d-9782-4c2e85360d49 | Open Energy Information  

Open Energy Info (EERE)

75665-3260-4c9d-9782-4c2e85360d49 75665-3260-4c9d-9782-4c2e85360d49 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Prescott, Arkansas (Utility Company) Effective date: End date if known: Rate name: Rental Lights-Flood Light (250 HP sodium) Sector: Lighting Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

24

Data:A3aa4a87-9c83-4c65-891a-ac54954ecd0d | Open Energy Information  

Open Energy Info (EERE)

aa4a87-9c83-4c65-891a-ac54954ecd0d aa4a87-9c83-4c65-891a-ac54954ecd0d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Security Lighting HPS 100 W w/ Pole Sector: Lighting Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. Source or reference: http://www.singingriver.com/Files/R-18.pdf Source Parent: Comments Energy Adjustment is Power Cost Adjustment plus Environmental Clause plus Regulatory Adjustment Applicability Demand (kW) Minimum (kW):

25

Data:6f2d6b9d-1cca-4f4c-b2fc-8e4c7e9593b0 | Open Energy Information  

Open Energy Info (EERE)

cca-4f4c-b2fc-8e4c7e9593b0 cca-4f4c-b2fc-8e4c7e9593b0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Gs-1 General Service Single Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

26

Data:225685a4-efe7-4587-8619-9bcba4c6bdec | Open Energy Information  

Open Energy Info (EERE)

efe7-4587-8619-9bcba4c6bdec efe7-4587-8619-9bcba4c6bdec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconomowoc Utilities Effective date: 2007/09/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0598 per kilowatt-hour.

27

Data:66367784-4e4c-4dee-929b-903791b259cf | Open Energy Information  

Open Energy Info (EERE)

784-4e4c-4dee-929b-903791b259cf 784-4e4c-4dee-929b-903791b259cf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1996/05/02 End date if known: Rate name: Small Power Time Of Use, Schedule TOU-SP Sector: Commercial Description: Available for commercial and industrial service located at or near the Cooperative's three-phase distribution lines for loads from 20 kW to 100 kW. No standby or auxiliary service provided. Source or reference: Rate Binder B #4 Source Parent: Comments Subject to PCA, Tax Adjustment, and Power Factor Adjustment. Applicability

28

Data:E9364320-fd65-4c0a-862f-18347160d98b | Open Energy Information  

Open Energy Info (EERE)

364320-fd65-4c0a-862f-18347160d98b 364320-fd65-4c0a-862f-18347160d98b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Smithfield, North Carolina (Utility Company) Effective date: 2012/09/01 End date if known: Rate name: Large general service rate Sector: Industrial Description: This schedule is available for non-residential electric service when the Contract Demand is 750 kW or greater, or registered demand equals or exceeds 750 kW in two or more of the preceding twelve months. Purchase Power Adjustment Charge: The monthly bill may include a purchased power adjustment charge, if any is applicable for the Town to recover wholesale purchased power costs fully.

29

Data:112ec36e-487e-4c47-aeed-15543b91baa3 | Open Energy Information  

Open Energy Info (EERE)

ec36e-487e-4c47-aeed-15543b91baa3 ec36e-487e-4c47-aeed-15543b91baa3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Princeton, Wisconsin (Utility Company) Effective date: 2006/09/14 End date if known: Rate name: Gs-1 General Service Three Phase Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0524 per kilowatt-hour.

30

Data:43692800-abde-4c04-a769-4be81a5582b5 | Open Energy Information  

Open Energy Info (EERE)

92800-abde-4c04-a769-4be81a5582b5 92800-abde-4c04-a769-4be81a5582b5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Guntersville Electric Board Effective date: 2012/10/01 End date if known: Rate name: SDE SMSC Sector: Industrial Description: Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments *Subject to revenue adjustment,environmental adjustment and FCA Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

31

Data:C1a0d334-d74f-4b6d-92e2-966d42a4c4c9 | Open Energy Information  

Open Energy Info (EERE)

d334-d74f-4b6d-92e2-966d42a4c4c9 d334-d74f-4b6d-92e2-966d42a4c4c9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of St Marys, Ohio (Utility Company) Effective date: 2001/06/10 End date if known: Rate name: Industrial General Credit Interruptible Rate Sector: Industrial Description: *Available to any customer which has or will have generating capacity of at least 25 KW but not more than 100 KW and receives or would receive firm service under the General Service 127 rate schedule.The customer must sign an application for Generation Credit which will specify the maximum amount of firm capacity to be provided during interruptions.

32

GENERATING CAPACITY  

E-Print Network (OSTI)

Evidence from the U.S. and some other countries indicates that organized wholesale markets for electrical energy and operating reserves do not provide adequate incentives to stimulate the proper quantity or mix of generating capacity consistent with mandatory reliability criteria. A large part of the problem can be associated with the failure of wholesale spot market prices for energy and operating reserves to rise to high enough levels during periods when generating capacity is fully utilized. Reforms to wholesale energy markets, the introduction of well-design forward capacity markets, and symmetrical treatment of demand response and generating capacity resources to respond to market and institutional imperfections are discussed. This policy reform program is compatible with improving the efficiency of spot wholesale electricity markets, the continued evolution of competitive retail markets, and restores incentives for efficient investment in generating capacity consistent with operating reliability criteria applied by system operators. It also responds to investment disincentives that have been associated with volatility in wholesale energy prices, limited hedging opportunities and to concerns about regulatory opportunism. 1

Paul L. Joskow; Paul L. Joskow; Paul L. Joskow

2006-01-01T23:59:59.000Z

33

Nonlinear Midlatitude Ocean Adjustment  

Science Conference Proceedings (OSTI)

Ocean adjustment on annual to interdecadal scales to variable forcing is considered for a more nonlinear general circulation than has previously been studied. The nature of the response is a strong function of forcing frequency and importantly ...

William K. Dewar

2003-05-01T23:59:59.000Z

34

Hydrostatic Adjustment: Lamb's Problem  

Science Conference Proceedings (OSTI)

The prototype problem of hydrostatic adjustment for large-scale atmospheric motions is Presented. When a horizontally infinite layer of compressible fluid, initially at rest, is instantaneously heated, the fluid is no longer in hydrostatic ...

Peter R. Bannon

1995-05-01T23:59:59.000Z

35

Dynamic Capacity Investment with Two Competing Technologies  

Science Conference Proceedings (OSTI)

With the recent focus on sustainability, firms making adjustments to their production or distribution capacity levels often have the option of investing in newer technologies with lower carbon footprints and/or energy consumption. These more sustainable ... Keywords: dynamic capacity investment, sustainable operations, technology choice

Wenbin Wang, Mark E. Ferguson, Shanshan Hu, Gilvan C. Souza

2013-10-01T23:59:59.000Z

36

Data:975d56fc-c153-4c87-84ca-5180277733cb | Open Energy Information  

Open Energy Info (EERE)

d56fc-c153-4c87-84ca-5180277733cb d56fc-c153-4c87-84ca-5180277733cb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Miami-Cass County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Security Lights 150 watt high pressure sodium(Non-metered) Sector: Lighting Description: The Miami-Cass County Rural Electric Membership Corporation (REMC) shall charge and collect for security lighting service on the following bases of availability, character of service, monthly rate, and tax adjustment. AVAILABILITY: Available to any member of the REMC for continuous year round service for outdoor lighting where 120 volt service exists ahead of the meter loop.

37

An assessment of the MCNP4C weight window  

Science Conference Proceedings (OSTI)

A new, enhanced weight window generator suite has been developed for MCNP version 4C. The new generator correctly estimates importances in either a user-specified, geometry-independent, orthogonal grid or in MCNP geometric cells. The geometry-independent option alleviates the need to subdivide the MCNP cell geometry for variance reduction purposes. In addition, the new suite corrects several pathologies in the existing MCNP weight window generator. The new generator is applied in a set of five variance reduction problems. The improved generator is compared with the weight window generator applied in MCNP4B. The benefits of the new methodology are highlighted, along with a description of its limitations. The authors also provide recommendations for utilization of the weight window generator.

Christopher N. Culbertson; John S. Hendricks

1999-12-01T23:59:59.000Z

38

Nonlinear Baroclinic Adjustment  

Science Conference Proceedings (OSTI)

The concept of baroclinic adjustment is reexamined in the context of a fully nonlinear two-layer model on a ?-plane. Based on our results we propose a single, conceptually very simple mechanism of the nonlinear equilibration of waves and the mean ...

Priscilla Cehelsky; Ka Kit Tung

1991-09-01T23:59:59.000Z

39

Adjusted Growth Rates* Jan.  

U.S. Energy Information Administration (EIA) Indexed Site

Adjusted Adjusted Growth Rates* Jan. '99 to Feb. '99: -1.7% Feb. '98 to Feb. '99: +19.8% YTD '98 to YTD '99: +15.0% U.S. Distillate Fuel Sales 3,000 3,500 4,000 4,500 5,000 5,500 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1998 1999 2000 Adjusted Growth Rates* Dec '99 to Jan '00: -7.4% Jan '99 to Jan '00: -0.1% YTD '99 to YTD '00: -0.1% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1998 1999 2000 Adjusted Growth Rates* Dec '99 to Jan '00: -16.8% Jan '99 to Jan '00: -3.2% YTD '99 to YTD '00: -3.2% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1998 1999 2000 Adjusted Growth Rates* Dec '99 to Jan '00: -9.3% Jan '99 to Jan '00: +3.5% YTD '99 to YTD '00: +3.5% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul

40

Data:2122b3dc-0674-4595-a4c9-46bac849199e | Open Energy Information  

Open Energy Info (EERE)

dc-0674-4595-a4c9-46bac849199e dc-0674-4595-a4c9-46bac849199e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Prince George Electric Coop Effective date: 2009/10/01 End date if known: Rate name: SCHEDULE GS-4 GENERAL SERVICE Single Phase 50kVA or greater V2 Sector: Industrial Description: Applicability: Applicable for single-phase or multi-phase service not subject to Schedule A-7 or Schedule SGS-4 where the customer's load requires 50kVA or less of transformer capacity. This schedule is not applicable for service to any equipment with an initial inrush current in excess of 260 amperes unless approved by the Cooperative.

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Data:3e76dab7-4c55-4b2f-ad4e-c0f042c52c40 | Open Energy Information  

Open Energy Info (EERE)

dab7-4c55-4b2f-ad4e-c0f042c52c40 dab7-4c55-4b2f-ad4e-c0f042c52c40 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Haywood Electric Member Corp Effective date: 2012/06/01 End date if known: Rate name: RGS General Renewable Generation Service 54G (>25<50 kW w/o trans) - 5 year fixed Sector: Description: AVAILABILITY Available only to members located in the Cooperative's service territory who have Renewable Generation interconnected directly with the Cooperative's system with a capacity of 75 kW or less and contract with the Cooperative to sell all generated capacity and energy to the Cooperative. Renewable Generation, or Renewable Energy Resource, shall be as defined as adopted by NC G.S. 62-133.8(a)(8). Service necessary for the delivery of the member's power into the Cooperative's system under this schedule shall be furnished solely to the individual contracting member in a single enterprise, located entirely on a single, contiguous premise. Service hereunder shall be restricted to the capacity of the member's generating facilities which may be operated in parallel with the Cooperative's system. Service necessary to supply the member's Auxiliary Load when the member's generating facilities are not operating, shall be billed under the Energy Charges in this schedule, increased or decreased in accordance with the Wholesale Power Cost Adjustment Rider. Power delivered to the Cooperative under this schedule shall not offset or be substituted for power contracted for or which may be contracted for under any other schedule of the Cooperative. The obligations of the Cooperative in regard to service under this Rider are dependent upon its securing and retaining all necessary rights-of-way, privileges, franchises, and permits for such service. The Cooperative shall not be liable to any member or applicant for power in the event it is delayed in, or is prevented from purchasing power by its failure to secure and retain such rights-of-way, rights, privileges, franchises, and permits. The Cooperative also reserves the right to review and determine on a case by case basis whether it has the need and system capacity to absorb the amount of proposed generation on the Cooperatives distribution system due to size and/or location.

42

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Jan. '99 to Feb. '99: -1.7% Feb. '98 to Feb. '99: +19.8% YTD '98 to YTD '99: +15.0% 4,100 4,400 4,700 5,000 5,300 5,600 5,900 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons U.S. Distillate Fuel Sales 2011 2012 2013 Adjusted Growth Rates* Jul '13 to Aug '13: 2.5% Aug '12 to Aug '13: -1.3% YTD '12 to YTD '13: 1.5% 300 400 500 600 700 800 900 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons U.S. Residual Fuel Sales 2011 2012 2013 Adjusted Growth Rates* Jul '13 to Aug '13: -0.8%

43

Automatic temperature adjustment apparatus  

DOE Patents (OSTI)

An apparatus for increasing the efficiency of a conventional central space heating system is disclosed. The temperature of a fluid heating medium is adjusted based on a measurement of the external temperature, and a system parameter. The system parameter is periodically modified based on a closed loop process that monitors the operation of the heating system. This closed loop process provides a heating medium temperature value that is very near the optimum for energy efficiency.

Chaplin, James E. (66 Overlook Rd., Bloomingdale, NJ 07403)

1985-01-01T23:59:59.000Z

44

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

July '99 to Aug. '99: +4.7% July '99 to Aug. '99: +4.7% Aug. '98 to Aug. '99: +1.3% YTD '98 to YTD '99: +4.7% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* July '99 to Aug. '99: -1.9% Aug. '98 to Aug. '99: -0.4% YTD '98 to YTD '99: +0.9% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* July '99 to Aug. '99: -0.1% Aug. '98 to Aug. '99: -1.4% YTD '98 to YTD '99: -0.7% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* July '99 to Aug. '99: +22.3% Aug. '98 to Aug. '99: +21.1%

45

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Aug '99 to Sep '99: +4.9% Aug '99 to Sep '99: +4.9% Sep '98 to Sep '99: +4.7% YTD '98 to YTD '99: +4.7% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Aug '99 to Sep '99: -2.4% Sep '98 to Sep '99: +0.4% YTD '98 to YTD '99: +1.3% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Aug '99 to Sep '99: -2.1% Sep '98 to Sep '99: +4.6% YTD '98 to YTD '99: 0.0% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Aug '99 to Sep '99: +7.3% Sep '98 to Sep '99: +8.4% YTD '98 to YTD '99: +8.3%

46

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

June '99 to July '99: -5.4% June '99 to July '99: -5.4% July '98 to July '99: +3.3% YTD '98 to YTD '99: +6.3% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* June '99 to July '99: -0.5% July '98 to July '99: -0.4% YTD '98 to YTD '99: +1.1% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* June '99 to July '99: +0.5% July '98 to July '99: +1.0% YTD '98 to YTD '99: -0.3% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* June '99 to July '99: +1.5% July '98 to July '99: +10.2% YTD '98 to YTD '99: +7.2%

47

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Nov '99 to Dec '99: +5.3% Nov '99 to Dec '99: +5.3% Dec '98 to Dec '99: +8.7% YTD '98 to YTD '99: +5.0% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Nov '99 to Dec '99: +6.0% Dec '98 to Dec '99: +4.5% YTD '98 to YTD '99: +1.3% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Nov '99 to Dec '99: +2.4% Dec '98 to Dec '99: +3.0% YTD '98 to YTD '99: +0.9% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Nov '99 to Dec '99: +32.3% Dec '98 to Dec '99: +2.0% YTD '98 to YTD '99: +5.5%

48

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Oct '99 to Nov '99: +0.1% Oct '99 to Nov '99: +0.1% Nov '98 to Nov '99: +5.5% YTD '98 to YTD '99: +4.5% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Oct '99 to Nov '99: -0.7% Nov '98 to Nov '99: +1.7% YTD '98 to YTD '99: +1.1% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Oct '99 to Nov '99: +2.5% Nov '98 to Nov '99: +6.0% YTD '98 to YTD '99: +0.8% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Oct '99 to Nov '99: +9.7% Nov '98 to Nov '99: +2.2% YTD '98 to YTD '99: +6.2%

49

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Sep '99 to Oct '99: +3.9% Sep '99 to Oct '99: +3.9% Oct '98 to Oct '99: +2.3% YTD '98 to YTD '99: +4.4% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Sep '99 to Oct '99: -0.2% Oct '98 to Oct '99: -0.9% YTD '98 to YTD '99: +1.0% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Sep '99 to Oct '99: -1.9% Oct '98 to Oct '99: -0.7% YTD '98 to YTD '99: +0.4% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Sep '99 to Oct '99: -2.1% Oct '98 to Oct '99: -6.4% YTD '98 to YTD '99: +6.6%

50

Data:0472b256-1c9c-4724-b481-a4c65502392a | Open Energy Information  

Open Energy Info (EERE)

1c9c-4724-b481-a4c65502392a 1c9c-4724-b481-a4c65502392a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Marshfield, Wisconsin (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service between 200kW and 500kW Demand Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0515 per kilowatt-hour.

51

Data:4fde6590-186e-4c12-bdfa-2bb41d181830 | Open Energy Information  

Open Energy Info (EERE)

fde6590-186e-4c12-bdfa-2bb41d181830 fde6590-186e-4c12-bdfa-2bb41d181830 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Plymouth, Wisconsin (Utility Company) Effective date: 2011/12/22 End date if known: Rate name: Gs-2 Urban General Service Single Phase Optional Time-of-Day 8am-8pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0774 per kilowatt-hour.

52

Data:Ea2aca60-f239-4661-bf4c-5851afbff29c | Open Energy Information  

Open Energy Info (EERE)

aca60-f239-4661-bf4c-5851afbff29c aca60-f239-4661-bf4c-5851afbff29c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Ms-1 Street Lighting Service Overhead on Dedicated Poles 250 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

53

Data:A5617a82-ecde-4c78-ac12-6411816cfed0 | Open Energy Information  

Open Energy Info (EERE)

17a82-ecde-4c78-ac12-6411816cfed0 17a82-ecde-4c78-ac12-6411816cfed0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

54

Data:8bcbd59f-60cd-4c40-87dc-408f771892ed | Open Energy Information  

Open Energy Info (EERE)

bcbd59f-60cd-4c40-87dc-408f771892ed bcbd59f-60cd-4c40-87dc-408f771892ed No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Prairie Du Sac, Wisconsin (Utility Company) Effective date: 2006/06/15 End date if known: Rate name: Cp-1 Small Power Service with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0583 per kilowatt-hour.

55

Data:B6c61368-3940-4489-8c69-4c807992898a | Open Energy Information  

Open Energy Info (EERE)

368-3940-4489-8c69-4c807992898a 368-3940-4489-8c69-4c807992898a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of River Falls, Wisconsin (Utility Company) Effective date: 2008/04/11 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0662 per kilowatt-hour.

56

Capacity Markets for Electricity  

E-Print Network (OSTI)

ternative Approaches for Power Capacity Markets, Papers andand Steven Stoft, Installed Capacity and Price Caps: Oil onElectricity Markets Have a Capacity requirement? If So, How

Creti, Anna; Fabra, Natalia

2004-01-01T23:59:59.000Z

57

2. Gas Productive Capacity  

U.S. Energy Information Administration (EIA)

2. Gas Productive Capacity Gas Capacity to Meet Lower 48 States Requirements The United States has sufficient dry gas productive capacity at the wellhead to meet ...

58

Data:9e0e8088-2c21-4c35-b818-8ff4720c7526 | Open Energy Information  

Open Energy Info (EERE)

8-2c21-4c35-b818-8ff4720c7526 8-2c21-4c35-b818-8ff4720c7526 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Austin Energy Effective date: End date if known: Rate name: Church Service Sector: Commercial Description: This rate is applicable to any church, synagogue or other public place which is used for the purpose of conducting group religious worship services and whose demand for power does not qualify the facility for the general service - demand (E06) rate. Flat rate Adjustments = Transmission Service Rider http://www.austinenergy.com/About%20Us/Rates/Commercial/transmissionServiceAdjustmentRider.htm

59

Data:43fe7fae-7b0e-49d8-a65b-33e4c0bf25ed | Open Energy Information  

Open Energy Info (EERE)

fae-7b0e-49d8-a65b-33e4c0bf25ed fae-7b0e-49d8-a65b-33e4c0bf25ed No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Brodhead Water & Lighting Comm Effective date: 2010/02/15 End date if known: Rate name: General Service - GS-1 - Single Phase Sector: Commercial Description: *POWER COST ADJUSTMENT CLAUSE (PCAC): All metered rates are subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt - hour of sales) is greater or lesser than the base cost of power purchased and produced (per kilowatt - hour of sales).

60

Data:3c5e5e45-0988-4c91-9cab-f4a7d1dcfdf9 | Open Energy Information  

Open Energy Info (EERE)

0988-4c91-9cab-f4a7d1dcfdf9 0988-4c91-9cab-f4a7d1dcfdf9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Irrigation Non- Control-Rate 8 Sector: Commercial Description: -Available to irrigation consumers,public authorities,trusts and municipalities or single phase lines for pumping and incidental lighting service - Subject to Power cost adjustment, Tax adjustment,Load Control Rider and Rate revisions. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Data:30708464-8436-4c5b-8d14-e757e64c5eef | Open Energy Information  

Open Energy Info (EERE)

464-8436-4c5b-8d14-e757e64c5eef 464-8436-4c5b-8d14-e757e64c5eef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: End date if known: Rate name: Four or More Lights 1000-Watt Sector: Lighting Description: - Available to all consumers located on or adjacent to cooperative's single-phase or three-phase lines. - Subject to power cost adjustment,tax adjustment and rate revisions. - Monthly rate depend on light within 150ft. proximity. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

62

Data:B0ec4251-4c41-4b53-9283-65ba6e46fc87 | Open Energy Information  

Open Energy Info (EERE)

ec4251-4c41-4b53-9283-65ba6e46fc87 ec4251-4c41-4b53-9283-65ba6e46fc87 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Covington, Indiana (Utility Company) Effective date: End date if known: Rate name: Commercial Sector: Commercial Description: Note: A Fuel Cost Adjustment will apply. The Adjustment is calculated on a quarterly basis. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

63

Data:3b97fbcc-e840-4c5d-9834-abbfc846af20 | Open Energy Information  

Open Energy Info (EERE)

fbcc-e840-4c5d-9834-abbfc846af20 fbcc-e840-4c5d-9834-abbfc846af20 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Reedsburg Utility Comm Effective date: 2011/06/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

64

Data:149d83cc-a06d-4331-b4c7-bbe968dd1140 | Open Energy Information  

Open Energy Info (EERE)

d83cc-a06d-4331-b4c7-bbe968dd1140 d83cc-a06d-4331-b4c7-bbe968dd1140 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Georgetown, Texas (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Municipal Service Sector: Commercial Description: *The Power Cost Adjustment is shown in the Flat rate adjustment field. Source or reference: http://billing.georgetown.org/rates/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

65

Data:9a5b478a-dce4-4c72-88d1-d8372c6aa060 | Open Energy Information  

Open Energy Info (EERE)

8a-dce4-4c72-88d1-d8372c6aa060 8a-dce4-4c72-88d1-d8372c6aa060 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Large Power 2 W/5% Discount -Rate 13 Sector: Industrial Description: - Available to industrial power customers using service under term contract for lighting,motive and heating purposes. - Subject to Power cost adjustment, Tax adjustment and Rate revisions. Source or reference: Rate binder #4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

66

Data:E43c47e3-ff4c-4587-a991-ed215d4e0aba | Open Energy Information  

Open Energy Info (EERE)

e3-ff4c-4587-a991-ed215d4e0aba e3-ff4c-4587-a991-ed215d4e0aba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 250 W HPS Utility purchased Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

67

Data:A92617cf-4642-4c4f-8543-9170c0f2e4ee | Open Energy Information  

Open Energy Info (EERE)

4642-4c4f-8543-9170c0f2e4ee 4642-4c4f-8543-9170c0f2e4ee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Park Lights 175-Watt MVL Sector: Lighting Description: - Available to all consumers located on or adjacent to cooperative's single-phase or three-phase lines. - Subject to power cost adjustment,tax adjustment and rate revisions. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

68

Data:38b36936-96aa-4c88-b7d9-174fcdc2f183 | Open Energy Information  

Open Energy Info (EERE)

936-96aa-4c88-b7d9-174fcdc2f183 936-96aa-4c88-b7d9-174fcdc2f183 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tell City, Indiana (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Tariff F: 0 to 75 KVA Three Phase Residential and Commercial Sector: Commercial Description: The charges derived in the Tariff F rate are subject to adjustment for: Purchased Power Adjustment Tracking Factor. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

69

Data:Cce17d4f-997c-4c75-945f-7b671a130bbb | Open Energy Information  

Open Energy Info (EERE)

Cce17d4f-997c-4c75-945f-7b671a130bbb Cce17d4f-997c-4c75-945f-7b671a130bbb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1995/12/01 End date if known: Rate name: Commercial Service-Single Phase, Schedule C-1 Sector: Commercial Description: Business, industrial and non-residential service such as schools, rural water districts, churches and public buildings, for all uses subject to the established rules and regulations of the Cooperative. Not available for irrigation uses. Subject to Power Cost Adjustment and Tax Adjustment Source or reference: Rates Binder B #4

70

Data:4aabcf17-3199-49b2-8eb4-aa4c584fd23f | Open Energy Information  

Open Energy Info (EERE)

aabcf17-3199-49b2-8eb4-aa4c584fd23f aabcf17-3199-49b2-8eb4-aa4c584fd23f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Municipal Service Primary Metering/Ownership Sector: Commercial Description: *Load management credit of $1.40/hp per month (minimum of $5.60 per month) during summer months (June-September) for customers with master metering and city controlled load management. Subject to production cost adjustment and power factor adjustment. 3.5% reduction in bill for primary metering and ownership/maintenance of transformation equipment.

71

Metric adjusted skew information  

E-Print Network (OSTI)

We extend the concept of Wigner-Yanase-Dyson skew information to something we call ``metric adjusted skew information'' (of a state with respect to a conserved observable). This ``skew information'' is intended to be a non-negative quantity bounded by the variance (of an observable in a state) that vanishes for observables commuting with the state. We show that the skew information is a convex function on the manifold of states. It also satisfies other requirements, proposed by Wigner and Yanase, for an effective measure-of-information content of a state relative to a conserved observable. We establish a connection between the geometrical formulation of quantum statistics as proposed by Chentsov and Morozova and measures of quantum information as introduced by Wigner and Yanase and extended in this article. We show that the set of normalized Morozova-Chentsov functions describing the possible quantum statistics is a Bauer simplex and determine its extreme points. We determine a particularly simple skew information, the ``lambda-skew information,'' parametrized by a lambda in (0,1], and show that the convex cone this family generates coincides with the set of all metric adjusted skew informations. Key words: Skew information, convexity, monotone metric, Morozova-Chentsov function, lambda-skew information.

Frank Hansen

2006-07-23T23:59:59.000Z

72

Vortex Generation Through Balanced Adjustment  

Science Conference Proceedings (OSTI)

The problem of geostrophic adjustment, originally considered by C.G. Rossby, is solved in an axisymmetric geometry for a continuously stratified fluid, where the adjusted final state is in hydrostatic, gradient-wind balance. This problem is ...

James C. McWilliams

1988-08-01T23:59:59.000Z

73

Data:447c862a-a9b4-4c4c-b6b1-833c63e4c70e | Open Energy Information  

Open Energy Info (EERE)

2a-a9b4-4c4c-b6b1-833c63e4c70e 2a-a9b4-4c4c-b6b1-833c63e4c70e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bandon, Oregon (Utility Company) Effective date: End date if known: Rate name: Residential- Inside City Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

74

Reference Buildings by Climate Zone and Representative City: 4C Seattle,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reference Buildings by Climate Zone and Representative City: 4C Reference Buildings by Climate Zone and Representative City: 4C Seattle, Washington Reference Buildings by Climate Zone and Representative City: 4C Seattle, Washington In addition to the ZIP file for each building type, you can directly view the "scorecard" spreadsheet that summarizes the inputs and results for each location. This Microsoft Excel spreadsheet is also included in the ZIP file. For version 1.4, only the IDF file is included. refbldg_4c_usa_wa_seattle_new2004_v1.3_5.0.zip refbldg_4c_usa_wa_seattle_new2004_v1-4_7-2.zip More Documents & Publications Reference Buildings by Climate Zone and Representative City: 4C Seattle, Washington Reference Buildings by Climate Zone and Representative City: 4C Seattle, Washington Reference Buildings by Climate Zone and Representative City: 2B Phoenix,

75

Data:81ba3d93-577d-4c94-bf96-867fbaa39596 | Open Energy Information  

Open Energy Info (EERE)

ba3d93-577d-4c94-bf96-867fbaa39596 ba3d93-577d-4c94-bf96-867fbaa39596 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota Effective date: 2012/05/01 End date if known: Rate name: SMALL GENERAL TIME OF DAY SERVICE kWh Metered (A16) Sector: Commercial Description: AVAILABILITY Available to any non-residential customer for single or three phase electric service supplied through one meter. DETERMINATION OF CUSTOMER BILLS Customer bills shall reflect energy charges (if applicable) based on customer's kWh usage, plus a customer charge (if applicable), plus demand charges (if applicable) based on customer's kW billing demand as defined. INTERIM RATE ADJUSTMENT A 4.49% Interim Rate Surcharge will be applied to rate components specified in the "Interim Rate Surcharge Rider." In addition, customer bills under this rate are subject to the following adjustments and/or charges. FUEL CLAUSE Bills are subject to the adjustments provided for in the Fuel Clause Rider. RESOURCE ADJUSTMENT Bills are subject to the adjustments provided for in the Conservation Improvement Program Adjustment Rider, the State Energy Policy Rate Rider, the Renewable Development Fund Rider, the Transmission Cost Recovery Rider, the Renewable Energy Standard Rider and the Mercury Cost Recovery Rider. ENVIRONMENTAL IMPROVEMENT RIDER Bills are subject to the adjustments provided for in the Environmental Improvement Rider.

76

FAQs about Storage Capacity  

Gasoline and Diesel Fuel Update (EIA)

about Storage Capacity about Storage Capacity How do I determine if my tanks are in operation or idle or non-reportable? Refer to the following flowchart. Should idle capacity be included with working capacity? No, only report working capacity of tanks and caverns in operation, but not for idle tanks and caverns. Should working capacity match net available shell in operation/total net available shell capacity? Working capacity should be less than net available shell capacity because working capacity excludes contingency space and tank bottoms. What is the difference between net available shell capacity in operation and total net available shell capacity? Net available shell capacity in operation excludes capacity of idle tanks and caverns. What do you mean by transshipment tanks?

77

Data:515de3b2-c165-4c4c-9d32-349a503492a7 | Open Energy Information  

Open Energy Info (EERE)

b2-c165-4c4c-9d32-349a503492a7 b2-c165-4c4c-9d32-349a503492a7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Colquitt Electric Membership Corp Effective date: 1993/06/01 End date if known: Rate name: 1000W Existing MH-Flood, OVERHEAD WIRING, Wood Pole Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Source or reference: ISU Documentation Source Parent: Comments Additional $1.50 will be charged for mounted on 30 foot wood pole Applicability

78

Data:9859aa63-0c3f-4c01-8e4c-e2eb958b89df | Open Energy Information  

Open Energy Info (EERE)

0c3f-4c01-8e4c-e2eb958b89df 0c3f-4c01-8e4c-e2eb958b89df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ocmulgee Electric Member Corp Effective date: 1999/05/01 End date if known: Rate name: 250W Type -'HPS-Flood', kWh-Metered Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Corporation's specifications. Service will be rendered only at locations that, solely in the opinion of the Corporation, are readily accessible for installation and maintenance. Source or reference: ISU Documentation

79

Data:E5787da3-ca96-4c3c-92ac-4c3fcd7736ec | Open Energy Information  

Open Energy Info (EERE)

87da3-ca96-4c3c-92ac-4c3fcd7736ec 87da3-ca96-4c3c-92ac-4c3fcd7736ec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2010/01/01 End date if known: Rate name: RATE NO. 10 GATES & TURNOUTS Sector: Industrial Description: Applicability: To all irrigation motors operated for the exclusive use of opening or closing gates or turnouts for the purposes of irrigating farm fields or to fill canals which are ultimately used to irrigate fields. Source or reference: http://www.ed3online.org/view/70 Source Parent: Comments Applicability Demand (kW) Minimum (kW):

80

Data:D1aaa365-5f7d-4c4c-8475-887600ff6285 | Open Energy Information  

Open Energy Info (EERE)

65-5f7d-4c4c-8475-887600ff6285 65-5f7d-4c4c-8475-887600ff6285 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power (Maryland) Effective date: 2012/06/01 End date if known: Rate name: OUTDOOR RECREATIONAL LIGHTING SERVICE - SECONDARY "ORL" Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DPLMdMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Data:E3f81776-ab00-4c28-a9a1-4c81c2932922 | Open Energy Information  

Open Energy Info (EERE)

776-ab00-4c28-a9a1-4c81c2932922 776-ab00-4c28-a9a1-4c81c2932922 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Story City, Iowa (Utility Company) Effective date: 2004/01/01 End date if known: Rate name: Mercury Vapor - 100 Watt Sector: Lighting Description: Source or reference: Ted binder 1 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

82

Data:497ee8ee-9481-4c78-b1be-f5a4c554cd4a | Open Energy Information  

Open Energy Info (EERE)

ee8ee-9481-4c78-b1be-f5a4c554cd4a ee8ee-9481-4c78-b1be-f5a4c554cd4a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bandon, Oregon (Utility Company) Effective date: End date if known: Rate name: City Use Small Commercial Single Phase- Outside City Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

83

Data:272dfabe-7e5a-4c6f-865c-e9e0c100ed2e | Open Energy Information  

Open Energy Info (EERE)

dfabe-7e5a-4c6f-865c-e9e0c100ed2e dfabe-7e5a-4c6f-865c-e9e0c100ed2e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawaiian Electric Co Inc Effective date: 2011/03/01 End date if known: Rate name: INTEGRATED RESOURCE PLANNING COST RECOVERY PROVISION Sector: Commercial Description: Supplement to Schedule R, G, J, DS, P, F, U, TOU-R, TOU-G, TOU-J, SS, TOU EV, EV-R and EV-C. INTEGRATED RESOURCE PLANNING COST RECOVERY ADJUSTMENT: All Rate Schedules .........................0.000 percent Residential Demand-Side Management (DSM) Adjustment: Schedule R, TOU-R, TOU EV, EV-R - per kWh........0.0812 ¢/kWh Commercial and Industrial Demand-Side Management (DSM) Adjustment: Schedules G, J, DS, P, U, TOU-G, TOU-J, SS, EV-C - per kWh .........0.1081 ¢/kWh SolarSaver Adjustment: Schedules R, TOU-R, TOU EV, EV-R - per kWh ....... -0.1037 ¢/kWh For more information, see the source of rate.

84

Data:2833f3b3-9bb4-4574-a97e-2f4c557f1f44 | Open Energy Information  

Open Energy Info (EERE)

f3b3-9bb4-4574-a97e-2f4c557f1f44 f3b3-9bb4-4574-a97e-2f4c557f1f44 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1996/05/02 End date if known: Rate name: Commercial Time of Use (Three-Phase), Schedule TOU-C Sector: Commercial Description: Business, industrial and non-residential service. Minimum Charge shall be the highest of: (a) Customer Charge of 15.00; or (b) As prescribed by the line extension policy of the rules and regulations of the Cooperative Subject to Power Cost Adjustment and Tax Adjustment Subject to Power Cost Adjustment and Tax Adjustment

85

Data:33db466d-20e7-4d4c-8fe8-57fe6694f5fd | Open Energy Information  

Open Energy Info (EERE)

db466d-20e7-4d4c-8fe8-57fe6694f5fd db466d-20e7-4d4c-8fe8-57fe6694f5fd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kenergy Corp Effective date: 2011/09/01 End date if known: Rate name: Fuel Adjustment Rider Sector: Description: APPLICABLE In all territory served. FUEL ADJUSTMENT RATE SECTION 1 BILLINGS TO CUSTOMERS SERVED FROM NON-DEDICATED DELIVERY POINTS Billings computed pursuant to rate schedules to which this section is applicable shall be adjusted based on the following formula where all references to costs and revenues will exclude amounts associated with customers served from Dedicated Delivery Points. The fuel adjustment rate applicable to KWH sold in the current month under each rate to which this section applies shall be based upon the fallowing formula: F= ((WFAC-O+U)/(P(m) x L)) - F(b)

86

Table 8.4c Consumption for Electricity Generation by Energy ...  

U.S. Energy Information Administration (EIA)

Table 8.4c Consumption for Electricity Generation by Energy Source: Commercial and Industrial Sectors, 1989-2011 (Subset of Table 8.4a; Trillion ...

87

Data:Ae67fc36-3373-483a-9558-3b43cfc3f4c7 | Open Energy Information  

Open Energy Info (EERE)

7fc36-3373-483a-9558-3b43cfc3f4c7 7fc36-3373-483a-9558-3b43cfc3f4c7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota Effective date: 2012/05/01 End date if known: Rate name: LIMITED OFF PEAK SERVICE Secondary Single Phase (Commercial & Industrial) Sector: Commercial Description: AVAILABILITY Available to any customers for controlled loads that will be energized only for the time period between 10:00 p.m. to 6:30 a.m. daily. DETERMINATION OF CUSTOMER BILLS Customer bills shall reflect energy charges (if applicable) based on customer's kWh usage, plus a customer charge (if applicable), plus demand charges (if applicable) based on customer's kW billing demand as defined. INTERIM RATE ADJUSTMENT A 4.49% Interim Rate Surcharge will be applied to rate components specified in the "Interim Rate Surcharge Rider." In addition, customer bills under this rate are subject to the following adjustments and/or charges. FUEL CLAUSE Bills are subject to the adjustments provided for in the Fuel Clause Rider. RESOURCE ADJUSTMENT Bills are subject to the adjustments provided for in the Conservation Improvement Program Adjustment Rider, the State Energy Policy Rate Rider, the Renewable Development Fund Rider, the Transmission Cost Recovery Rider, the Renewable Energy Standard Rider and the Mercury Cost Recovery Rider.

88

Data:26bd7d19-fef5-4c11-ba59-8f70438999d9 | Open Energy Information  

Open Energy Info (EERE)

bd7d19-fef5-4c11-ba59-8f70438999d9 bd7d19-fef5-4c11-ba59-8f70438999d9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota Effective date: 2012/05/01 End date if known: Rate name: Residential TOD Overhead ESH (A02 ISU) Sector: Residential Description: Available to any residential customer for domestic purposes only in a single private residence and qualifying farm customers. DETERMINATION OF CUSTOMER BILLS Customer bills shall reflect energy charges (if applicable) based on customer's kWh usage, plus a customer charge (if applicable), plus demand charges (if applicable) based on customer's kW billing demand as defined. A 4.49% Interim Rate Surcharge will be applied to rate components specified in the "Interim Rate Surcharge Rider." In addition, customer bills under this rate are subject to the following adjustments and/or charges. FUEL CLAUSE Bills are subject to the adjustments provided for in the Fuel Clause Rider. RESOURCE ADJUSTMENT Bills are subject to the adjustments provided for in the Conservation Improvement Program Adjustment Rider, the State Energy Policy Rate Rider, the Renewable Development Fund Rider, the Transmission Cost Recovery Rider, the Renewable Energy Standard Rider and the Mercury Cost Recovery Rider. ENVIRONMENTAL IMPROVEMENT RIDER Bills are subject to the adjustments provided for in the Environmental Improvement Rider.

89

Data:12578fcf-89f2-4c61-8989-4a4632704a33 | Open Energy Information  

Open Energy Info (EERE)

fcf-89f2-4c61-8989-4a4632704a33 fcf-89f2-4c61-8989-4a4632704a33 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2011/09/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 5 Outdoor Lighting Service - NSS Area Light HPS Power Bracket 70W Sector: Lighting Description: APPLICABLE TO THE USE OF SERVICE FOR: Outdoor lighting for residential and general service customers where applicable electric service is available. Flat rate Adjustments = Transition Charge+MFC. Bill Issuance Charge (per bill): $0.73, as described in General Information Section 16.J. and applicable to those customers where charges for this service classification are the only charges that appear on the customer's bill.

90

Data:5f057b20-4645-4c96-99d4-760516132708 | Open Energy Information  

Open Energy Info (EERE)

7b20-4645-4c96-99d4-760516132708 7b20-4645-4c96-99d4-760516132708 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Whitehall Electric Utility Effective date: 2010/02/15 End date if known: Rate name: General Service- Time-of-Day- Single-Phase- Peak: 7am-7pm Sector: Commercial Description: This rate schedule is optional to all Gs-1, General Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

91

Data:90bd4c27-fcd0-4680-b555-f11780ef16be | Open Energy Information  

Open Energy Info (EERE)

bd4c27-fcd0-4680-b555-f11780ef16be bd4c27-fcd0-4680-b555-f11780ef16be No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Stratford, Wisconsin (Utility Company) Effective date: 2008/11/18 End date if known: Rate name: General Service- Three-Phase- Time-of-Day- Peak: 7am-7pm Sector: Commercial Description: This rate schedule is optional to all Gs-1, General Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

92

Comparison of Productive Capacity  

U.S. Energy Information Administration (EIA)

Appendix B Comparison of Productive Capacity Comparisons of base case productive capacities for this and all previous studies were made (Figure B1).

93

Tables - Refinery Capacity Report  

U.S. Energy Information Administration (EIA)

Tables: 1: Number and Capacity of Operable Petroleum Refineries by PAD District and State as of January 1, 2009: PDF: 2: Production Capacity of Operable ...

94

Data:E103db42-1b10-4c14-9853-5d348fce3ee9 | Open Energy Information  

Open Energy Info (EERE)

db42-1b10-4c14-9853-5d348fce3ee9 db42-1b10-4c14-9853-5d348fce3ee9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Detroit Edison Co Effective date: 2011/12/21 End date if known: Rate name: ALTERNATIVE PRIMARY SUPPLY SERVICE D6.1 SUBTRANSMISSION-24 TO 41.6 kV (Retail Access) Sector: Description: Demand charge per kW of Max Demand. Available to customers desiring service at primary, subtransmission, or transmission voltage who contract for a specified capacity of not less than 10,000 kilowatts at a single location. HOURS OF SERVICE: 24 hours, subject to interruption by agreement, or by advance notice. CURRENT, PHASE AND VOLTAGE: Alternating current, three-phase, nominally at 4,800, 13,200, 24,000, 41,570 or 120,000 volts at the option of the Company. CONTRACT CAPACITY: Customers shall contract for a specified capacity in kilowatts sufficient to meet normal maximum requirements but not less than 10,000 kilowatts. The Company undertakes to provide the necessary facilities for a supply of electric power from its primary distribution system at the contract capacity. Any single reading of the demand meter in any month that exceeds the contract capacity then in effect shall become the new contract capacity. The contract capacity for customers served at more than one voltage level shall be the sum of the contract capacities established for each voltage level.

95

Data:Abc741bf-375d-4c2d-85e6-d13134962efc | Open Energy Information  

Open Energy Info (EERE)

Abc741bf-375d-4c2d-85e6-d13134962efc Abc741bf-375d-4c2d-85e6-d13134962efc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ocmulgee Electric Member Corp Effective date: 1999/05/01 End date if known: Rate name: SCHEDULE LP-13 LARGE POWER SERVICE Sector: Commercial Description: To all electric service of one standard secondary voltage required on consumer's premises, and whose transformer capacity exceeds 50 kVA, delivered at one point and metered at or compensated to that voltage. No service rendered hereunder may be resold nor transmitted to other premises, either directly or indirectly, without the express consent of the Corporation, and then only upon the condition that the energy resold is not sub-metered.

96

Data:86569193-360e-4643-9a4c-99f318741e1e | Open Energy Information  

Open Energy Info (EERE)

9193-360e-4643-9a4c-99f318741e1e 9193-360e-4643-9a4c-99f318741e1e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2001/07/01 End date if known: Rate name: 34 XLP-HLF-1 Sector: Description: Available to consumers requiring a transformer capacity of 1000 KVA or more, but less than 5000 KVA, subject to eh Association's established rules and regulations. This rate applies to electric service measured by one meter used exclusively by one Consumer in a single establishment on one premise utilizing a single delivery point, and not resold or shared with others. Three phase, 60 cycles, at Association's standard or an approved voltage.

97

Data:Fc620c5a-4c53-43e5-a3d9-a00122654f5c | Open Energy Information  

Open Energy Info (EERE)

c5a-4c53-43e5-a3d9-a00122654f5c c5a-4c53-43e5-a3d9-a00122654f5c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wheat Belt Public Power Dist Effective date: 2013/01/01 End date if known: Rate name: Street lights Public or Private 400w Sector: Lighting Description: Qualifying Service Municipalities: For lighting service to public, town and/or city facilities, pursuant to the terms set forth in the Franchise Agreement. Customers: For lighting service to customer facilities where such services can be provided directly from the 12.5/7.2 or 24.9/14.4 kV distribution system. Production Cost Adjustments In the event that adjustments are made to the District's wholesale cost of power, charges or credits shall be made to this rate accordingly. Such charges or credits shall be billed separately as "Production Cost Adjustments." If changes are made to the wholesale supplier's power rate for the District, the District reserves the right to change this rate to reflect the wholesale supplier changes.

98

Data:Ba0f3eda-174c-4c9a-b225-2e529b0669d7 | Open Energy Information  

Open Energy Info (EERE)

f3eda-174c-4c9a-b225-2e529b0669d7 f3eda-174c-4c9a-b225-2e529b0669d7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Wisconsin Effective date: 2012/01/01 End date if known: Rate name: Cg-1 (Time Of Day Three Phase) Sector: Commercial Description: Availability: Available to non-residential customers for single- or three- phase electric service. Not available for customers with a maximum demand of 25 kW or greater. Availability is at discretion of Company and is subject to the ability of Company to obtain and install required metering equipment. Company agrees to keep this schedule or a similar schedule available to customers for a minimum of five years. If customer moves, both original and new customers have the option to retain time-of-day billing or to transfer to Small General Service Rate Schedule Cg-2. Energy Cost Adjustment: Bills subject to the adjustment provided for in Energy Cost Adjustment. See schedule X-1, Sheet No. E 63.

99

Data:Da7e5181-864b-4c5b-b5cc-6e04fe12034b | Open Energy Information  

Open Energy Info (EERE)

e5181-864b-4c5b-b5cc-6e04fe12034b e5181-864b-4c5b-b5cc-6e04fe12034b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Black Earth, Wisconsin (Utility Company) Effective date: 1999/08/01 End date if known: Rate name: Ms-1 Outdoor Lighting Service: 175W MV(Overhead) Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting units. Fixed Monthly Charge includes Commitment to Community Rider: $1.33 per customer per month. Power Cost Adjustment Clause: Charge per all kWh varies monthly.

100

Data:576e0c83-d44e-4c16-adb3-6b023b08663e | Open Energy Information  

Open Energy Info (EERE)

c83-d44e-4c16-adb3-6b023b08663e c83-d44e-4c16-adb3-6b023b08663e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL - HPS 200w Sector: Lighting Description: Applicable to the Colorado Department of Transportation and municipalities for Customer-Owned Lighting Service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Data:0d7255b1-f647-41c9-959b-4783fca4c9be | Open Energy Information  

Open Energy Info (EERE)

f647-41c9-959b-4783fca4c9be f647-41c9-959b-4783fca4c9be No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Two Rivers Water & Light Effective date: 2011/01/01 End date if known: Rate name: Small Power Sector: Commercial Description: This rate will be applied to customers for all types of service if their monthly Maximum Measured Demand is in excess of 100 kilowatts (kW) per month for three or more months in a consecutive 12-month period, but not greater than 200 kW per month for three or more months in a consecutive 12-month period. The following Riders, Adjustments, and Billing Options are applicable to this rate:

102

Data:2161e654-24cf-4c0c-8c6f-3628dc9123b9 | Open Energy Information  

Open Energy Info (EERE)

4-24cf-4c0c-8c6f-3628dc9123b9 4-24cf-4c0c-8c6f-3628dc9123b9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pioneer Electric Coop, Inc Effective date: 2012/03/27 End date if known: Rate name: SCHEDULE A-2-12 ALL ELECTRIC SERVICE Single Phase-Rural Sector: Residential Description: This tariff is available for all electrical usage by residential customers who use electricity exclusively and where the majority of usage is residential in nature. Service is subject to the established rules and regulations of the Cooperative. Energy sales under this schedule are subject to the Energy Cost Adjustment.

103

Data:8d1135ae-4c06-4edc-a54c-0998a935e74d | Open Energy Information  

Open Energy Info (EERE)

ae-4c06-4edc-a54c-0998a935e74d ae-4c06-4edc-a54c-0998a935e74d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Two Rivers Water & Light Effective date: 2011/01/01 End date if known: Rate name: Street Lighting- 100W HPS- Overhead Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting units. The lighting pole charge applies if the lamp is on a dedicated pole that is not used to support the utility distribution system. Pole Charge: $3.00 per pole, per month. The Power Cost Adjustment Clause applies to this rate.

104

Data:50c16450-21c4-4ea2-9476-4c96774559c1 | Open Energy Information  

Open Energy Info (EERE)

-21c4-4ea2-9476-4c96774559c1 -21c4-4ea2-9476-4c96774559c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: COMMERCIAL SERVICE - SCHEDULE C Sector: Commercial Description: Applicable to customers whose demands are less than 25 kW for electric power service supplied at secondary distribution voltage. Not applicable to standby or resale service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

105

Data:615cd71b-3165-4c1f-920a-e98f026b1b66 | Open Energy Information  

Open Energy Info (EERE)

b-3165-4c1f-920a-e98f026b1b66 b-3165-4c1f-920a-e98f026b1b66 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pioneer Electric Coop, Inc Effective date: 2012/03/27 End date if known: Rate name: SCHEDULE A-2-12 ALL ELECTRIC SERVICE Three Phase-City Sector: Commercial Description: This tariff is available for all electrical usage by residential customers who use electricity exclusively and where the majority of usage is residential in nature. Service is subject to the established rules and regulations of the Cooperative. Energy sales under this schedule are subject to the Energy Cost Adjustment

106

Data:Cc5f1d5a-fb37-4737-bc86-b4a4c87c1203 | Open Energy Information  

Open Energy Info (EERE)

a-fb37-4737-bc86-b4a4c87c1203 a-fb37-4737-bc86-b4a4c87c1203 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Trico Electric Cooperative Inc Effective date: 2009/08/01 End date if known: Rate name: Lighting Service 400 Watt HPS Sector: Lighting Description: *Subject to tax and wholesale power cost adjustment. Source or reference: http://www.trico.coop/images/TRICO_OL1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

107

Data:8ac54c54-708d-4174-ba51-8a3ae4c66ae3 | Open Energy Information  

Open Energy Info (EERE)

-708d-4174-ba51-8a3ae4c66ae3 -708d-4174-ba51-8a3ae4c66ae3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Trico Electric Cooperative Inc Effective date: 2009/08/01 End date if known: Rate name: General Service TOU Single-Phase Primary Discount Sector: Commercial Description: *This rate is limited to the first 100 qualified customers. Subject to tax and power cost adjustment. Source or reference: http://www.trico.coop/images/TRICO_GSTOU.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

108

Data:0ad066b4-df3a-4c24-b70d-b3671d22b56e | Open Energy Information  

Open Energy Info (EERE)

6b4-df3a-4c24-b70d-b3671d22b56e 6b4-df3a-4c24-b70d-b3671d22b56e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Dover, Delaware (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Rate R: Residential Sector: Residential Description: This rate is subject to the Purchase Power Clause. This rate is subject to the "GEF" Rider. Note: The Flat rate Adjustments entered here is the "Delaware Green Energy Fund Charge" located within the Green Energy Fund (GEF) Rider. Source or reference: Rates Binder B Source Parent: Comments Applicability Demand (kW)

109

Data:C1fdf6f9-737f-442a-b875-740f4c9fcba1 | Open Energy Information  

Open Energy Info (EERE)

fdf6f9-737f-442a-b875-740f4c9fcba1 fdf6f9-737f-442a-b875-740f4c9fcba1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mitchell Electric Member Corp Effective date: 2009/01/01 End date if known: Rate name: SCHEDULE A-14 RESIDENTIAL SERVICE Sector: Residential Description: AVAILABILITY Available in all territory served by the Cooperative, in accordance with the Cooperative's Service Rules and Regulations. APPLICABILITY Applicable to all residential service. Source or reference: http://facts.psc.state.ga.us/Public/GetDocument.aspx?ID=128409 Source Parent: Comments Variable power cost adjustment applies.

110

Data:679ba462-320c-4c63-84c8-a6219fb55208 | Open Energy Information  

Open Energy Info (EERE)

ba462-320c-4c63-84c8-a6219fb55208 ba462-320c-4c63-84c8-a6219fb55208 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Courtland, Alabama (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: MSD Sector: Industrial Description: Source or reference: ISU Binder Source Parent: Comments flat rate & fuel cost adjustment change monthly Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3

111

Data:A8e5606b-8374-4c78-9c17-c0418aa1d557 | Open Energy Information  

Open Energy Info (EERE)

06b-8374-4c78-9c17-c0418aa1d557 06b-8374-4c78-9c17-c0418aa1d557 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL - HPS 150w 2 Sector: Lighting Description: Applicable to the Colorado Department of Transportation and municipalities for Customer-Owned Lighting Service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

112

Data:D5c32ffa-34cd-4c52-ab6a-462ba0159723 | Open Energy Information  

Open Energy Info (EERE)

ffa-34cd-4c52-ab6a-462ba0159723 ffa-34cd-4c52-ab6a-462ba0159723 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Adel, Georgia (Utility Company) Effective date: End date if known: Rate name: Residential Service Sector: Residential Description: For all domestic uses of a residential customer in a separately metered single family or multifamily dwelling unit. Subject to Revenue Adjustment and Environmental Compliance cost recovery. Source or reference: Rate Binder # 2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

113

Data:71ed6bbb-bcbc-4c99-97b4-33d24ddc5f27 | Open Energy Information  

Open Energy Info (EERE)

bbb-bcbc-4c99-97b4-33d24ddc5f27 bbb-bcbc-4c99-97b4-33d24ddc5f27 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Two Rivers Water & Light Effective date: 2011/01/01 End date if known: Rate name: Security Lighting- 175W MH Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting units. The lighting pole charge applies if the lamp is on a dedicated pole that is not used to support the utility distribution system. Pole Charge: $3.00 per pole, per month. The Power Cost Adjustment Clause applies to this rate.

114

Data:3e46d77e-2205-4395-bd30-8b4c2ab273a1 | Open Energy Information  

Open Energy Info (EERE)

e-2205-4395-bd30-8b4c2ab273a1 e-2205-4395-bd30-8b4c2ab273a1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alaska Village Elec Coop, Inc Effective date: 2012/07/01 End date if known: Rate name: Residential Rate: Selawik Village Sector: Residential Description: For 1-500 kWh consumed: Rate = ( .30 + Cost of Fuel) - (PCE Adjustment) For 501-700 kWh consumed: Rate = (.30 + Cost of Fuel) Over 700 kWh consumed: Rate = (.20 + Cost of Fuel) Source or reference: http://www.avec.org/customer-service.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

115

Data:9a69b524-1e13-4c50-a2f9-2dcfbad300ff | Open Energy Information  

Open Energy Info (EERE)

9b524-1e13-4c50-a2f9-2dcfbad300ff 9b524-1e13-4c50-a2f9-2dcfbad300ff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Trico Electric Cooperative Inc Effective date: 2009/08/01 End date if known: Rate name: Interruptible Service-Three Phase Sector: Industrial Description: *Applicable for general service customers for commercial ,business,professional and industrial loads in excess of 10KW. Subject to tax and wholesale power cost adjustments. Source or reference: http://www.trico.coop/images/TRICO_IS1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

116

Data:8d87b4b8-b5b5-4c46-9ed6-cebef387c342 | Open Energy Information  

Open Energy Info (EERE)

b4b8-b5b5-4c46-9ed6-cebef387c342 b4b8-b5b5-4c46-9ed6-cebef387c342 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Harmon Electric Assn Inc Effective date: 2010/04/25 End date if known: Rate name: Controllable Irrigation, 11 to 25 HP Sector: Commercial Description: * Available to members of the Cooperative for pump irrigation service located adjacent to its three-phase lines. Total load during peak period for up to four(4) hours per day and not to exceed 30 days per year. Subject to Power Factor Adjustment. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW)

117

Data:1c10a400-dd28-4c82-a012-f68705bc6e89 | Open Energy Information  

Open Energy Info (EERE)

a400-dd28-4c82-a012-f68705bc6e89 a400-dd28-4c82-a012-f68705bc6e89 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Choctaw Electric Coop Inc Effective date: 2008/10/21 End date if known: Rate name: Poultry and Swine Service,Single-Phase Sector: Commercial Description: * Available to all single-phase consumers for service associated with contract poultry or swine operations.Residential and other commercial uses are not eligible Subject to tax adjustments. Source or reference: Rate binder #4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

118

Data:21f82fa4-c8be-4402-9389-a2fe25288e22 | Open Energy Information  

Open Energy Info (EERE)

fa4-c8be-4402-9389-a2fe25288e22 fa4-c8be-4402-9389-a2fe25288e22 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Miami-Cass County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Security Lights Metered 150 watt high pressure sodium Sector: Lighting Description: The Miami-Cass County Rural Electric Membership Corporation (REMC) shall charge and collect for security lighting service on the following bases of availability, character of service, monthly rate, and tax adjustment. AVAILABILITY: Available to any member of the REMC for continuous year round service for outdoor lighting where 120 volt service exists ahead of the meter loop.

119

Data:Bcf2a026-b4c8-4c46-9667-aa7b55501739 | Open Energy Information  

Open Energy Info (EERE)

a026-b4c8-4c46-9667-aa7b55501739 a026-b4c8-4c46-9667-aa7b55501739 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rappahannock Electric Coop Effective date: 2009/11/01 End date if known: Rate name: INTERRUPTIBLE SERVICE RIDER IS-2 Sector: Industrial Description: Applicable upon request to Customers taking service under Schedule LP-1 provided that: 1) the Customer normally uses electric power during hours of the day in which the ODEC billing peak typically occurs; 2) the Customer contracts for a load of 500 kW or more; and 3) it is specified by contract that the Customer has at least 300 kW of load which can be interrupted at the request of the Cooperative. All provisions of LP-1 are still applicable. Schedule IS-2 is not applicable as a rider to Schedule LP-1-RA. The Customer shall pay to the Cooperative charges in accordance with Schedule EF based on the cost of furnishing and installing all additional equipment required to receive the benefits of Schedule IS-2.

120

Data:Dd2c15c8-1b4c-4c7d-9cb8-ce59bc951432 | Open Energy Information  

Open Energy Info (EERE)

c15c8-1b4c-4c7d-9cb8-ce59bc951432 c15c8-1b4c-4c7d-9cb8-ce59bc951432 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Corn Belt Energy Corporation Effective date: End date if known: Rate name: RATE 5 GENERAL SERVICE OVER 50 KW DEMAND Sector: Commercial Description: Applicable to commercial and industrial consumers for all uses including lighting, heating and power, subject to the established rules and regulations of the Cooperative. Approval of the Cooperative must be obtained prior to installation of any motor requiring starting current in excess of 260 amperes. Source or reference: http://www.cornbeltenergy.com/images/pdfs/700-05%20central%20rate%205%20effective%2004-07.pdf

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Data:22f43cbe-4c35-4f15-8ae4-c6e31da1144a | Open Energy Information  

Open Energy Info (EERE)

cbe-4c35-4f15-8ae4-c6e31da1144a cbe-4c35-4f15-8ae4-c6e31da1144a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No2 Pinal Cnty Effective date: 2009/01/01 End date if known: Rate name: Commercial Rate Schedule No. 4s Sector: Industrial Description: This Rate is applicable to District customers served under Rate Schedule No. 4 who install a photovoltaic (PV) solar system having a nameplate rating limited to no more than 100,000 watts or the customer's peak demand over the previous 12 months, whichever is less. To be eligible the customer must sign a Solar Electrical Application and Agreement and comply with the installation and equipment specifications contained therein. This rate is experimental in order to assist the District in determining appropriate procedures for rates for commercial solar customers. It is subject to rescission by the ED2 Board of Directors at anytime. Energy Delivered to District over what customer uses is purchased at $0.04/kwh

122

Data:436faf45-0d93-4c87-967f-0ca5d4c9ad5b | Open Energy Information  

Open Energy Info (EERE)

faf45-0d93-4c87-967f-0ca5d4c9ad5b faf45-0d93-4c87-967f-0ca5d4c9ad5b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/07/01 End date if known: Rate name: CATV power supply-Outside Corporate Limits Sector: Commercial Description: For the purpose of paying the expenses of conducting and managing the Electric Division, Utilities Department, of the City, the City Manager is hereby authorized and directed to charge the following rates, for all utility bills issued on and after the dates indicated below. These rates are applicable to service calls, unmetered services, standby power and miscellaneous installations which do not fall under the normal rate schedules, which rates are hereby adopted for all utility bills issued on and after July 1, 1990

123

Data:1e279b62-c136-4c41-9183-6250e2f2d4c3 | Open Energy Information  

Open Energy Info (EERE)

9b62-c136-4c41-9183-6250e2f2d4c3 9b62-c136-4c41-9183-6250e2f2d4c3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: San Luis Valley R E C, Inc Effective date: 2013/01/01 End date if known: Rate name: Irrigation Demand Sector: Commercial Description: $2 monthly demand charge plus energy charges as follows. Blocks of 200 kWh/HP/Mo: 1st block = $0.124/kWh. 2nd block = $0.107/kWh. 3rd block = $0.054/kWh. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

124

Data:4ef61a7d-382d-4c55-bc58-4c697136dd24 | Open Energy Information  

Open Energy Info (EERE)

ef61a7d-382d-4c55-bc58-4c697136dd24 ef61a7d-382d-4c55-bc58-4c697136dd24 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bartholomew County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Outdoor Security Lighting Service, Mercury Vapor Flood Light, 1000W (Existing Wood Pole) Sector: Lighting Description: Availability Available to any consumer of the Corporation where 120-volt service exists ahead of the meter loop for the use of Security Lighting, subject to the Corporation's Service Rules and Regulations. Customers receiving OSL service using a wood pole owned by the customer prior to May 1, 2000 or owned by the Corporation but required for a use other than OSL service shall receive service under the existing wood pole rate. All other customers shall receive service under the new wood pole rate.

125

Data:8623e0f4-c613-4c38-9d41-969ce0dbefae | Open Energy Information  

Open Energy Info (EERE)

3e0f4-c613-4c38-9d41-969ce0dbefae 3e0f4-c613-4c38-9d41-969ce0dbefae No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oncor Electric Delivery Company LLC Effective date: 2012/01/01 End date if known: Rate name: Outdoor Lighting Service (CLOSED), Flood Lights - SV - 400W Sector: Lighting Description: Applicable to Competitive Retailers for unmetered lighting service supplied exclusively to one or more existing outdoor lamps as specified below operating automatically from dusk to dawn. Not applicable to street lighting. Source or reference: http://www.oncor.com/EN/Documents/About%20Oncor/Billing%20Rate%20Schedules/Tariff%20for%20Retail%20Delivery%20Service_05-30-13.pdf

126

Data:20b2a59f-4c34-4ba5-ad82-4c47a4797ba9 | Open Energy Information  

Open Energy Info (EERE)

f-4c34-4ba5-ad82-4c47a4797ba9 f-4c34-4ba5-ad82-4c47a4797ba9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp Effective date: 2008/10/01 End date if known: Rate name: Outdoor Lighting MV Open Bottom 400 W Sector: Lighting Description: Assuming Existing Pole Source or reference: http://www.tri-countyemc.com/skins/userfiles/file/Outdoor_lighting_1_2_3.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

127

Hydrostatic Adjustment in Nonisothermal Atmospheres  

Science Conference Proceedings (OSTI)

The author examines hydrostatic adjustment due to heating in two nonisothermal atmospheres. In the first case both the temperature and lapse rate decrease with height; in the second case the atmosphere consists of a troposphere with constant ...

Dean G. Duffy

2003-01-01T23:59:59.000Z

128

Automatic Adjustment of AVHRR Navigation  

Science Conference Proceedings (OSTI)

An automatic adjustment method of the Advanced Very High-Resolution Radiometer (AVHRR) images navigation has been developed for operational use at the Centre de Mtorologic Spatiale (CMS) in Lannion, France. Selected coastal landmarks are ...

Philippe Bordes; Pascal Brunel; Anne Marsouin

1992-02-01T23:59:59.000Z

129

Geostrophic Adjustment on Hexagonal Grids  

Science Conference Proceedings (OSTI)

A simple two-dimensional linearized model of the atmosphere is used to investigate behavior of the geostrophic adjustment process on five selected horizontal hexagonal grids. This study shows that hexagonal lattices have some advantages over ...

Slobodan Ni?kovi?; Milivoj B. Gavrilov; Ivana A. Toi?

2002-03-01T23:59:59.000Z

130

Network Routing Capacity  

E-Print Network (OSTI)

We define the routing capacity of a network to be the supremum of all possible fractional message throughputs achievable by routing. We prove that the routing capacity of every network is achievable and rational, we present an algorithm for its computation, and we prove that every non-negative rational number is the routing capacity of some network. We also determine the routing capacity for various example networks. Finally, we discuss the extension of routing capacity to fractional coding solutions and show that the coding capacity of a network is independent of the alphabet used.

Jillian Cannons; Randall Dougherty; Christopher Freiling; Kenneth Zeger

2005-01-01T23:59:59.000Z

131

Table CE1-4c. Total Energy Consumption in U.S. Households by Type ...  

U.S. Energy Information Administration (EIA)

Table CE1-4c. Total Energy Consumption in U.S. Households by Type of Housing Unit, 1997 ... where the end use is electric air-conditioning, ...

132

Table CE3-4c. Electric Air-Conditioning Energy Consumption in U.S ...  

U.S. Energy Information Administration (EIA)

Table CE3-4c. Electric Air-Conditioning Energy Consumption in U.S. Households by Type of Housing Unit, 2001 RSE Column Factor: Total Type of Housing Unit

133

Temperature dependence of thermoelectric properties of SiC/B{sub 4}C  

SciTech Connect

We report on the temperature dependence of thermoelectric properties of {ital p}-type SiC/B{sub 4}C system for thermoelectric devices. Measurements of electrical resistivity, thermoelectric power and thermal conductivity were made on SiC as a function of both B{sub 4}C doping concentration over the range 0.2%{similar_to}60 wt. % and temperature over the range from room temperature up to 600 {degree}C. The figure of merit increases from 2 to 5 decades with temperature increase from room temperature to 600 {degree}C. We conclude that the SiC/B{sub 4}C system with around 10% of B{sub 4}C is a promising candidate for thermoelectric applications in the temperature range 400{similar_to}600 {degree}C. {copyright} {ital 1995} {ital American} {ital Institute} {ital of} {ital Physics}.

Okamoto, Y.; Aruga, A.; Kasai, H.; Morimoto, J.; Miyakawa, T.; Fujimoto, S. [Natl. Def. Acad., Dept. MSE (Japan)

1994-08-10T23:59:59.000Z

134

Data:85ed0bec-9f0b-4c0c-b7df-7552714728ba | Open Energy Information  

Open Energy Info (EERE)

bec-9f0b-4c0c-b7df-7552714728ba bec-9f0b-4c0c-b7df-7552714728ba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kiwash Electric Coop, Inc Effective date: 2010/01/01 End date if known: Rate name: Commercial and Industrial 37.5 kVa of Transformer Capacity or larger Sector: Commercial Description: Available for commercial, industrial, and three phase farm service for all uses, including lighting, heating, and power, subject to the established rules and regulations of the Cooperative. Source or reference: ISU Sharepoint Documentation Source Parent: Comments Energy Charge= Operations Charge + Wholesale Power Charge ($0.05250 per kWh)

135

Data:E391b94b-6359-4c9d-b634-ec7f1aa26501 | Open Energy Information  

Open Energy Info (EERE)

1b94b-6359-4c9d-b634-ec7f1aa26501 1b94b-6359-4c9d-b634-ec7f1aa26501 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Harmon Electric Assn Inc Effective date: 2010/04/25 End date if known: Rate name: Residential and Farm Sector: Residential Description: * Available to consumers for all rural and urban residential, farm and public uses subject to the established rules and regulation of the Association. This capacity of individual motors served under this rate shall not exceed ten horsepower. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

136

Data:72d437a2-b2f6-4008-bbcd-00ca4c69fd92 | Open Energy Information  

Open Energy Info (EERE)

a2-b2f6-4008-bbcd-00ca4c69fd92 a2-b2f6-4008-bbcd-00ca4c69fd92 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1995/12/01 End date if known: Rate name: RV Recreational Vehicle Rate Sector: Residential Description: Available to Consumers at locations where service is provided for use by recreational vehicles. Minimum monthly charge shall be the highest of the following: (a) Customer Charge (b) A charge of $1.50 per kVA of dedicated (sole-use) transformation capacity; or (c) As prescribed by the line extension policy of hte rules and regulations of the Cooperative

137

Data:77e1348b-4666-4c7f-b94f-dbfc164c79f5 | Open Energy Information  

Open Energy Info (EERE)

348b-4666-4c7f-b94f-dbfc164c79f5 348b-4666-4c7f-b94f-dbfc164c79f5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Fulton County Rural E M C Effective date: End date if known: Rate name: RESIDENTIAL AND FARM SERVICE (WH) Sector: Residential Description: Applicable only for single-phase supplies through one meter to each residential or farm service. Service under this schedule is limited to members who have installed and operate on a regular year-round basis, an electric water heater of not less than thirty (30) gallons capacity. Maximum transformer size supplied under this rate is 100 kVA.

138

Data:F264ff6a-6f58-45a8-90dd-4c45cd64c556 | Open Energy Information  

Open Energy Info (EERE)

4ff6a-6f58-45a8-90dd-4c45cd64c556 4ff6a-6f58-45a8-90dd-4c45cd64c556 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeast Colorado Power Assn Effective date: 2012/01/01 End date if known: Rate name: Small Service Sector: Commercial Description: SCHEDULE SS Available to Single Phase and Three Phase services not qualifying for the FH tariff and requiring 25 KVA or below transformer capacity. (Not available to Irrigation or demand metered accounts. Source or reference: http://secpa.com/sites/rate-schedules.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

139

Data:408684f1-cc3e-4c8b-a3c2-e331c0e78277 | Open Energy Information  

Open Energy Info (EERE)

f1-cc3e-4c8b-a3c2-e331c0e78277 f1-cc3e-4c8b-a3c2-e331c0e78277 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Little Ocmulgee El Member Corp Effective date: 2009/01/01 End date if known: Rate name: Schedule "R-7" Sector: Commercial Description: Applicable to permanent full-time consumers and use incidental thereto, and at one standard voltage. The capacity of individual motors served under the Schedule shall not exceed 10 horsepower. No service rendered hereunder may be resold or transmitted to other premises, either directly or indirectly, without expressed consent of the Cooperative.

140

Data:6618eb9a-44ef-4c1e-9dae-d6f2ccf3dde3 | Open Energy Information  

Open Energy Info (EERE)

eb9a-44ef-4c1e-9dae-d6f2ccf3dde3 eb9a-44ef-4c1e-9dae-d6f2ccf3dde3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Highline Electric Assn Effective date: 2013/01/01 End date if known: 2013/12/31 Rate name: Small Commercial Rates (Three Phase) Sector: Commercial Description: Applicable commercial consumers, small industrial consumers and three-phase farm consumers for all usage, subject to the conditions of service and the established rules and regulations of the Association. Service under this schedule is limited to consumers whose load requirement is less than 50 kva of transformer capacity.

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Data:B41b5a9a-0806-4f4c-abae-d7019a4ad886 | Open Energy Information  

Open Energy Info (EERE)

a9a-0806-4f4c-abae-d7019a4ad886 a9a-0806-4f4c-abae-d7019a4ad886 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kootenai Electric Cooperative Effective date: 2012/04/01 End date if known: Rate name: Smart Pay General Service Sector: Commercial Description: AVAILABILITY: Available to members for uses subject to the established rules and regulations of the Cooperative. The capacity of individual motors served under this schedule shall not exceed 10 H.P. Additional Information: Service Availability Charge: $0.55/ per day and SMART Pay Equipment Charge: $0.45/per day are used to create the Monthly Fixed Charge

142

Data:B72045de-7152-4c2d-9225-7fe56d9e98e2 | Open Energy Information  

Open Energy Info (EERE)

de-7152-4c2d-9225-7fe56d9e98e2 de-7152-4c2d-9225-7fe56d9e98e2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kit Carson Electric Coop, Inc Effective date: 2011/09/22 End date if known: Rate name: Power Service - Primary Sector: Commercial Description: Available to all consumers within the Utility's service requiring 50 kVa or more of transformer capacity for all types of usage, subject to the execution of a service contract. For service to consumers who requirements are 3,000 kW or higher, the rate shall be as specified in a special contract. Source or reference: www.kitcarson.com Source Parent:

143

Data:A25af663-a82a-4c3f-8ac7-37afa5d56907 | Open Energy Information  

Open Energy Info (EERE)

af663-a82a-4c3f-8ac7-37afa5d56907 af663-a82a-4c3f-8ac7-37afa5d56907 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Commercial Load Control Single Phase-Rate 71 Sector: Commercial Description: 1. Available for oil well pumping, commercial and industrial uses,where a portion of the consumer's peak demand may be reduced or eliminated through the use of installed load control equipment by the cooperative. 2. Service under this schedule is limited to consumers whose load requirements do not exceed 50kVA of transformer capacity.

144

Data:8f66d4c8-4781-4648-bcf0-58e4c67979bd | Open Energy Information  

Open Energy Info (EERE)

c8-4781-4648-bcf0-58e4c67979bd c8-4781-4648-bcf0-58e4c67979bd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Frankfort, Kentucky (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Rate 10 Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

145

Data:C0357ad4-c4ce-4c4d-b37c-516ea60e5772 | Open Energy Information  

Open Energy Info (EERE)

-c4ce-4c4d-b37c-516ea60e5772 -c4ce-4c4d-b37c-516ea60e5772 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sparta, Tennessee (Utility Company) Effective date: 2012/12/01 End date if known: Rate name: SDE SGSB Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

146

Data:5aad73b9-a25e-4c86-8322-006a2c4c7784 | Open Energy Information  

Open Energy Info (EERE)

aad73b9-a25e-4c86-8322-006a2c4c7784 aad73b9-a25e-4c86-8322-006a2c4c7784 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland, Washington (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Schedule 70: Security Lighting Area Lighting - Metered 1,000 Watt Mercury Vapor Sector: Lighting Description: A. Availability: In all territory served by the City's electric utility. B. Applicability: To all property owners or long-term leasees of property. C. Contract Provisions: The rates in this schedule apply to facilities consisting of overhead construction with mast arms and luminaries mounted on wood poles with lumen output as shown. Lighting facilities supplied under this schedule shall remain the property of the City, and shall be supplied only pursuant to a contract with the customer, the term of which shall be a period of not less than three (3) years. Pole Rental: When an individual wood pole is required on a new installation, the following monthly charges apply: 40 feet or less $ 1.00 Over 40 feet $ 1.00 plus $0.05 per foot Additional charge will be made for lamps installed seventy-five (75) feet or more above the ground.

147

Price adjustment at multiproduct retailers  

E-Print Network (OSTI)

We empirically study the price adjustment process at multiproduct retail stores. We use a unique store level data set for five large supermarket and one drugstore chains in the U.S., to document the exact process required to change prices. Our data set allows us to study this process in great detail, describing the exact procedure, stages, and steps undertaken during the price change process. We also discuss various aspects of the microeconomic environment in which the price adjustment decisions are made, factors affecting the price adjustment decisions, and firm-level implications of price adjustment decisions. Specifically, we examine the effects of the complexity of the price change process on the stores pricing strategy. We also study how the steps involved in the price change process, combined with the laws governing the retail price setting and adjustment, along with the competitive market structure of the retail grocery industry, influence the frequency of price changes. We also examine how the mistakes that occur in the price change process influence the actions taken by these multiproduct retailers. In particular, we study how these mistakes can make the stores vulnerable to civil law suits and penalties, and also damage their reputation. We also show how the mistakes can lead to stockouts or unwanted inventory accumulations. Finally, we discuss how retail stores try to minimize these

Daniel Levy; Mark Bergen; Robert Venable; Robert W. Baird

1998-01-01T23:59:59.000Z

148

ORISE: Capacity Building  

NLE Websites -- All DOE Office Websites (Extended Search)

Capacity Building Capacity Building Because public health agencies must maintain the resources to respond to public health challenges, critical situations and emergencies, the Oak Ridge Institute for Science and Education (ORISE) helps government agencies and organizations develop a solid infrastructure through capacity building. Capacity building refers to activities that improve an organization's ability to achieve its mission or a person's ability do his or her job more effectively. For organizations, capacity building may relate to almost any aspect of its work-from leadership and administration to program development and implementation. Strengthening an organizational infrastructure can help agencies and community-based organizations more quickly identify targeted audiences for

149

Modeling Capacity Reservation Contract  

E-Print Network (OSTI)

In this paper we model a scenario where a chip designer (buyer) buys capacity from chip manufacturers (suppliers) in the presence of demand uncertainty faced by the buyer. We assume that the buyer knows the probability distribution of his demand. The supplier offers the buyer to reserve capacity in advance at a price that is lower than the historical average of the spot price. The suppliers price (if the buyer reserves capacity in advance) is function of her capacity, demand for her capacity, unit production cost, the average spot market price and the amount of capacity reserved by the buyer. Based on these parameters we derive the price the suppliers will charge. We formulate the problem from the buyers perspective. The buyers decisions are how much capacity to reserve and from how many suppliers. The optimal solution is obtained numerically. Our model addresses the following issues that are not covered in the current literature on capacity reservation models. In the existing literature the suppliers price is an exogenous parameter. We model the suppliers price from relevant parameters mentioned above. This makes our model richer. For example, if the expected capacity utilization for the supplier is likely to be low then the supplier will charge a lower price for capacity reservation. In reality, the buyer sources from multiple suppliers. Most mathematical models on capacity reservation, we are aware of, assumes a single buyer and a single supplier. We generalize this to a single buyer and multiple suppliers.

Jishnu Hazra; B. Mahadevan; Sudhi Seshadri

2002-01-01T23:59:59.000Z

150

Rate Adjustments and Public Involvement  

NLE Websites -- All DOE Office Websites (Extended Search)

Rate Adjustments and Public Involvement Documents Rate Adjustments and Public Involvement Documents CRSP Transmission 9/16/2013 WAPA-161 FRN, CRSP transmission and ancillary services rates extension Letter announcing two-year extension to CRSP transmission and ancillary services rates Letter announcing revised CRSP transmission rates for FY 2014 Accompanying calculation table for FY 2014 CRSP transmission rate letter Letter announcing revised CRSP transmission rates for FY 2013 Letter announcing revised CRSP transmission rates for FY 2012 Letter announcing revised CRSP transmission rates for FY 2011 Letter announcing revised CRSP transmission rates for FY 2010 SLCA/IP 9/16/2013 WAPA-161 FRN, SLCA/IP firm power rate extension Letter announcing two-year extension to SLCA/IP firm power rate SLCA/IP Tentative Rate Adjustment Schedule

151

Data:2b2bedda-c599-4c11-bcab-5b965b56e0ae | Open Energy Information  

Open Energy Info (EERE)

bedda-c599-4c11-bcab-5b965b56e0ae bedda-c599-4c11-bcab-5b965b56e0ae No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Indiana REMC Effective date: 2010/11/01 End date if known: Rate name: Residential Demand Reduction Rate - RS - DR Sector: Residential Description: Availability Available as an optional rate to any residential or farm consumer of the Corporation for singlephase electric service at a single delivery point who has installed an automatic standby generator. The generator must be at least 15 KW capacity. A representative of the Corporation must certify the standby generator has adequate capacity to supply the home during Corporation initiated control periods. A Demand Response Unit (DRU) must be installed that allows for remote control of the standby generator during peak periods as determined by the Corporation. The rated capacity of any motor served under this schedule in excess of ten (10) horsepower shall be subject to the approval of the Corporation. A consumer choosing this optional rate must remain on the rate for a minimum of six months. Consumers opting to change to a different rate schedule after the six month minimum period must wait a minimum of six months before returning to this optional rate.

152

Data:2712f437-587f-4c4b-822a-c5a2637ced21 | Open Energy Information  

Open Energy Info (EERE)

587f-4c4b-822a-c5a2637ced21 587f-4c4b-822a-c5a2637ced21 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: United Electric Coop, Inc Effective date: 2013/07/01 End date if known: Rate name: Non-Residential Sector: Commercial Description: *Available to all non-residential single phase service, subject to the established rules and regulations of the Cooperative. The minimum monthly charge under this rate shall be $1.06 per day where twenty-five (25) kVA or less of transformer capacity is required. For consumers requiring more than twenty-five (25) kVA of installed transformer capacity, the monthly minimum charge shall be increased at the rate of one dollar ($1.00) for each additional kVA of installed capacity required.

153

Data:Abb22900-14f1-4c75-8bf8-368dc0b56aca | Open Energy Information  

Open Energy Info (EERE)

Abb22900-14f1-4c75-8bf8-368dc0b56aca Abb22900-14f1-4c75-8bf8-368dc0b56aca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kiel, Wisconsin (Utility Company) Effective date: 2011/05/06 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 40kW and 200kW Demand Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0754 per kilowatt-hour.

154

Data:A26d7ad5-cad2-4010-98e4-c8b296b356e5 | Open Energy Information  

Open Energy Info (EERE)

ad5-cad2-4010-98e4-c8b296b356e5 ad5-cad2-4010-98e4-c8b296b356e5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Marshfield, Wisconsin (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 500kW Demand Secondary Voltage Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0515 per kilowatt-hour.

155

Data:Af8e377a-e827-4c1c-8d40-15ebbad90015 | Open Energy Information  

Open Energy Info (EERE)

e377a-e827-4c1c-8d40-15ebbad90015 e377a-e827-4c1c-8d40-15ebbad90015 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Prairie Du Sac, Wisconsin (Utility Company) Effective date: 2009/07/06 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 8am-8pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0583 per kilowatt-hour.

156

Data:Fed7685c-9038-4c1d-b7e3-6c157ad193f6 | Open Energy Information  

Open Energy Info (EERE)

Fed7685c-9038-4c1d-b7e3-6c157ad193f6 Fed7685c-9038-4c1d-b7e3-6c157ad193f6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Medford, Wisconsin (Utility Company) Effective date: 1997/06/27 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 1,000kW Demand 9am-9pm Primary Metering Discount Sector: Industrial Description: This rate will be applied to customers for all types of service if their monthly maximum demand is in excess of 1,000kW for 3 months in a consecutive 12-month period. Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0351 per kilowatt-hour.

157

Data:9e3fbc0a-49cc-47f0-b4c1-bf8fdef01206 | Open Energy Information  

Open Energy Info (EERE)

fbc0a-49cc-47f0-b4c1-bf8fdef01206 fbc0a-49cc-47f0-b4c1-bf8fdef01206 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconomowoc Utilities Effective date: 2007/09/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0598 per kilowatt-hour.

158

Data:0ed5752a-2910-4c7d-91ae-1e7bc4dcebfa | Open Energy Information  

Open Energy Info (EERE)

752a-2910-4c7d-91ae-1e7bc4dcebfa 752a-2910-4c7d-91ae-1e7bc4dcebfa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lodi, Wisconsin (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0811 per kilowatt-hour.

159

Data:F82e4c6b-834a-4896-b1a8-34228d8a4401 | Open Energy Information  

Open Energy Info (EERE)

e4c6b-834a-4896-b1a8-34228d8a4401 e4c6b-834a-4896-b1a8-34228d8a4401 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-1 Residential Service Three Phase with Parallel Generation(20kW or less)-Net Energy Billing Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

160

Data:16cc1788-21d0-4a0b-8df1-4c91f66fb14a | Open Energy Information  

Open Energy Info (EERE)

-21d0-4a0b-8df1-4c91f66fb14a -21d0-4a0b-8df1-4c91f66fb14a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hustisford Utilities Effective date: 2009/09/30 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 9am-9pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0720 per kilowatt-hour.

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Data:31412b9c-1c9a-4c34-bc05-31b73305106e | Open Energy Information  

Open Energy Info (EERE)

b9c-1c9a-4c34-bc05-31b73305106e b9c-1c9a-4c34-bc05-31b73305106e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cornell, Wisconsin (Utility Company) Effective date: 2008/05/12 End date if known: Rate name: Rg-1 Residential Service Single Phase Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0644 per kilowatt-hour.

162

Data:0e37b0f8-4c46-4aaa-84f1-4d238f470280 | Open Energy Information  

Open Energy Info (EERE)

f8-4c46-4aaa-84f1-4d238f470280 f8-4c46-4aaa-84f1-4d238f470280 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kiel, Wisconsin (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Gs-1 General Service Single Phase less than 40kW Demand Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0754 per kilowatt-hour.

163

Data:03a5b7ac-8077-4c7b-8447-227681ba848a | Open Energy Information  

Open Energy Info (EERE)

b7ac-8077-4c7b-8447-227681ba848a b7ac-8077-4c7b-8447-227681ba848a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Wisconsin (Utility Company) Effective date: 2006/02/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0549 per kWh. See schedule PCAC.

164

Data:8c5cf672-0105-4c19-811f-6e3a5e162578 | Open Energy Information  

Open Energy Info (EERE)

72-0105-4c19-811f-6e3a5e162578 72-0105-4c19-811f-6e3a5e162578 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lake Mills Light & Water Effective date: 2009/06/01 End date if known: Rate name: Gs-2 General Service Optional Time-of-Day Single Phase 8am-8pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0767 per kilowatt-hour.

165

Data:A4465437-054d-4c85-b31f-ad85156b42cf | Open Energy Information  

Open Energy Info (EERE)

054d-4c85-b31f-ad85156b42cf 054d-4c85-b31f-ad85156b42cf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Sauk City, Wisconsin (Utility Company) Effective date: 2008/08/18 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0756 per kilowatt-hour.

166

Data:31f20483-4592-4c4f-9d21-3c49d1c21640 | Open Energy Information  

Open Energy Info (EERE)

-4592-4c4f-9d21-3c49d1c21640 -4592-4c4f-9d21-3c49d1c21640 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Gresham, Wisconsin (Utility Company) Effective date: 2010/07/01 End date if known: Rate name: Cp-1 Small Power Service between 40kW and 200kW Demand Transformer Ownership discount with Parallel Generation(20 kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0627 per kilowatt-hour.

167

Data:468deba2-6acf-48b1-badb-2799fd4c7a68 | Open Energy Information  

Open Energy Info (EERE)

deba2-6acf-48b1-badb-2799fd4c7a68 deba2-6acf-48b1-badb-2799fd4c7a68 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Plymouth, Wisconsin (Utility Company) Effective date: 2011/12/22 End date if known: Rate name: Gs-2 Urban General Service Single Phase Optional Time-of-Day 8am-8pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0774 per kilowatt-hour.

168

Data:E821110f-ab66-4c9b-a53f-c179114707d7 | Open Energy Information  

Open Energy Info (EERE)

10f-ab66-4c9b-a53f-c179114707d7 10f-ab66-4c9b-a53f-c179114707d7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Reedsburg Utility Comm Effective date: 2011/06/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

169

Data:Baeabf17-b0ee-4c45-8109-a6c4d083beb9 | Open Energy Information  

Open Energy Info (EERE)

Baeabf17-b0ee-4c45-8109-a6c4d083beb9 Baeabf17-b0ee-4c45-8109-a6c4d083beb9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Cp-1 Small Power Service between 75kW and 200kW Demand Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less)-Net Energy Billing Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

170

Data:48aa9ee4-4833-4c24-ba80-2e9e65480468 | Open Energy Information  

Open Energy Info (EERE)

ee4-4833-4c24-ba80-2e9e65480468 ee4-4833-4c24-ba80-2e9e65480468 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Medford, Wisconsin (Utility Company) Effective date: 1997/06/27 End date if known: Rate name: Ms-1 Street Lighting Service 150 W HPS Sector: Lighting Description: The schedule will be applied to municipal street lighting. The utility will furnish, install and maintain street lighting units. Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0351 per kilowatt-hour.

171

Data:20d4a17b-005f-4c61-910a-421af41b222b | Open Energy Information  

Open Energy Info (EERE)

b-005f-4c61-910a-421af41b222b b-005f-4c61-910a-421af41b222b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Halifax Electric Member Corp Effective date: 2012/10/01 End date if known: Rate name: SECURITY LIGHTING 140-watt LED Light Sector: Commercial Description: AVAILABILITY: This Schedule is available in all territory served by the Cooperative, subject to its established Service Rules and Regulations. APPLICABILITY: This Schedule is applicable to any consumer served by the Cooperative ADJUSTMENT RIDERS AND TAXES: The Cooperative's approved Wholesale Power and TIER Adjustment, as well as the current North Carolina State Sales Tax, shall be applicable to all service supplied under this Schedule. Each lamp, since its power supply is un-metered, shall have a monthly estimated usage assigned for billing purposes as follows: 400-watt metal halide lamp - 150 kWh per month

172

Data:5703423e-a000-4c6a-8741-e3b39b95e868 | Open Energy Information  

Open Energy Info (EERE)

23e-a000-4c6a-8741-e3b39b95e868 23e-a000-4c6a-8741-e3b39b95e868 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Marshfield, Wisconsin (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0515 per kilowatt-hour.

173

Data:710af318-a679-441f-b02e-8ee78bc4c9b7 | Open Energy Information  

Open Energy Info (EERE)

18-a679-441f-b02e-8ee78bc4c9b7 18-a679-441f-b02e-8ee78bc4c9b7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Pardeeville, Wisconsin (Utility Company) Effective date: 2007/10/10 End date if known: Rate name: Ms-1 Street Lighting Service Overhead 100 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0680 per kilowatt-hour.

174

Data:61f81e8d-bb92-40d6-acba-ded2eee0c4c0 | Open Energy Information  

Open Energy Info (EERE)

f81e8d-bb92-40d6-acba-ded2eee0c4c0 f81e8d-bb92-40d6-acba-ded2eee0c4c0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service between 200kW and 5,000kW Demand 8am-8pm Transformer Ownership Discount (above 15,000 volts) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

175

Data:91802fe5-b4c3-47f8-a9c6-a746bbe6255e | Open Energy Information  

Open Energy Info (EERE)

2fe5-b4c3-47f8-a9c6-a746bbe6255e 2fe5-b4c3-47f8-a9c6-a746bbe6255e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lake Mills Light & Water Effective date: 2009/06/01 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0767 per kilowatt-hour.

176

Data:437b2a61-3520-43d3-a4c3-8ec29f2403a5 | Open Energy Information  

Open Energy Info (EERE)

3520-43d3-a4c3-8ec29f2403a5 3520-43d3-a4c3-8ec29f2403a5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Commercial General Service Demand T.O.U. Sector: Commercial Description: *Applicable to any customer who has demand exceeding 100 kW for three consecutive months and has the ability to shed a minimum of 50 kW during seasonal peak demand. Subject to production cost adjustment and power factor adjustment. Source or reference: http://www.ci.gothenburg.ne.us/Ordinances/2010_Current/868%20Utility%20Rates.pdf

177

Data:046d816e-e176-4c02-9602-047dbbe85eb4 | Open Energy Information  

Open Energy Info (EERE)

6e-e176-4c02-9602-047dbbe85eb4 6e-e176-4c02-9602-047dbbe85eb4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Plymouth, Wisconsin (Utility Company) Effective date: 2011/12/22 End date if known: Rate name: Gs-2 Urban General Service Single Phase Optional Time-of-Day 7am-7pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0774 per kilowatt-hour.

178

Data:A77ce17b-2988-4e75-9c91-ea4c6cc44ae0 | Open Energy Information  

Open Energy Info (EERE)

7b-2988-4e75-9c91-ea4c6cc44ae0 7b-2988-4e75-9c91-ea4c6cc44ae0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of New Glarus, Wisconsin (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Cp-1 Small Power Service Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0721 per kilowatt-hour.

179

Data:44fa34b9-ff22-4b3c-a986-a71daaf4c4cf | Open Energy Information  

Open Energy Info (EERE)

b9-ff22-4b3c-a986-a71daaf4c4cf b9-ff22-4b3c-a986-a71daaf4c4cf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Reedsburg Utility Comm Effective date: 2011/06/01 End date if known: Rate name: Gs-1 General Service Single Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

180

Data:20ce9f60-660b-4c65-bb8c-1a57b213627d | Open Energy Information  

Open Energy Info (EERE)

660b-4c65-bb8c-1a57b213627d 660b-4c65-bb8c-1a57b213627d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Plymouth, Wisconsin (Utility Company) Effective date: 2011/12/22 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 9am-9pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0774 per kilowatt-hour.

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Data:9944f743-0abb-4c16-9fb2-4fe2571bab84 | Open Energy Information  

Open Energy Info (EERE)

f743-0abb-4c16-9fb2-4fe2571bab84 f743-0abb-4c16-9fb2-4fe2571bab84 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Industrial Service (750 kW - 2499 kW) Primary Voltage Sector: Industrial Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. All kvar in excess of 40% (93% power factor) of billing demand will be billed at the rate of $0.90 per kvar. Primary voltage discount of $0.35 per kilowatt off of the demand charge. Source or reference: http://www.singingriver.com/Files/I-4.pdf

182

Data:8479fcc9-e059-4c39-a251-80242ae5c9e5 | Open Energy Information  

Open Energy Info (EERE)

fcc9-e059-4c39-a251-80242ae5c9e5 fcc9-e059-4c39-a251-80242ae5c9e5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kiel, Wisconsin (Utility Company) Effective date: 2011/05/06 End date if known: Rate name: Ms-1 Street Lighting Service Overhead 70 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0754 per kilowatt-hour.

183

Data:C63db0a0-d74f-4c70-bfc2-e4fdc63a9265 | Open Energy Information  

Open Energy Info (EERE)

a0-d74f-4c70-bfc2-e4fdc63a9265 a0-d74f-4c70-bfc2-e4fdc63a9265 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Clintonville, Wisconsin (Utility Company) Effective date: 2006/05/05 End date if known: Rate name: Gs-3 Large General Service Three Phase Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0680 per kWh. See schedule PCAC.

184

Data:Bbf127a0-b232-4c12-80b4-7413b78dc610 | Open Energy Information  

Open Energy Info (EERE)

Bbf127a0-b232-4c12-80b4-7413b78dc610 Bbf127a0-b232-4c12-80b4-7413b78dc610 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Ms-1 Street Lighting Service 100 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0509 per kilowatt-hour.

185

Data:0ad55bc8-09cd-4c0a-8c50-c86e23acce41 | Open Energy Information  

Open Energy Info (EERE)

bc8-09cd-4c0a-8c50-c86e23acce41 bc8-09cd-4c0a-8c50-c86e23acce41 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Muscoda, Wisconsin (Utility Company) Effective date: 2010/10/26 End date if known: Rate name: Cp-2 Large Power Service with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0844 per kilowatt-hour.

186

Data:713711eb-a68b-4c52-89cd-8c9ee87f41d8 | Open Energy Information  

Open Energy Info (EERE)

eb-a68b-4c52-89cd-8c9ee87f41d8 eb-a68b-4c52-89cd-8c9ee87f41d8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2010/02/01 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

187

Data:Bb90458c-02d6-4c38-9a6c-0cf1b09d330f | Open Energy Information  

Open Energy Info (EERE)

02d6-4c38-9a6c-0cf1b09d330f 02d6-4c38-9a6c-0cf1b09d330f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lake Mills Light & Water Effective date: 2009/06/01 End date if known: Rate name: Gs-2 General Service Optional Time-of-Day Single Phase 9am-9pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0767 per kilowatt-hour.

188

Data:630784b4-5341-4c70-9eae-99e43c19780e | Open Energy Information  

Open Energy Info (EERE)

b4-5341-4c70-9eae-99e43c19780e b4-5341-4c70-9eae-99e43c19780e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hustisford Utilities Effective date: 2008/09/30 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand Time-of-Day Service Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0720 per kilowatt-hour.

189

Data:86dbf507-bf42-46aa-8a5c-a4c5b838ce50 | Open Energy Information  

Open Energy Info (EERE)

7-bf42-46aa-8a5c-a4c5b838ce50 7-bf42-46aa-8a5c-a4c5b838ce50 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Cp-4 Large Industrial Power Time-of-Day Service 7am-9pm Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

190

Data:B8f25ab2-155d-4c16-b48e-905b2fa0455c | Open Energy Information  

Open Energy Info (EERE)

f25ab2-155d-4c16-b48e-905b2fa0455c f25ab2-155d-4c16-b48e-905b2fa0455c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Plymouth, Wisconsin (Utility Company) Effective date: 2011/12/22 End date if known: Rate name: Cp-1 Small Power Service Secondary Voltage Metering Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0774 per kilowatt-hour.

191

Data:Eb21d5cc-bf6e-4c19-8eeb-71dfc32772d6 | Open Energy Information  

Open Energy Info (EERE)

Eb21d5cc-bf6e-4c19-8eeb-71dfc32772d6 Eb21d5cc-bf6e-4c19-8eeb-71dfc32772d6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Manitowoc Public Utilities Effective date: 2009/06/01 End date if known: Rate name: Gs-1 General Service Single Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0361 per kilowatt-hour.

192

Data:0f952a4d-1370-4c7d-963b-67f3598f249b | Open Energy Information  

Open Energy Info (EERE)

2a4d-1370-4c7d-963b-67f3598f249b 2a4d-1370-4c7d-963b-67f3598f249b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Muscoda, Wisconsin (Utility Company) Effective date: 2010/10/26 End date if known: Rate name: Ms-1 Street and Area Lighting Service Overhead 104 W LED Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0844 per kilowatt-hour.

193

Data:Ba79a221-64ee-4c90-a183-8e036694c8a5 | Open Energy Information  

Open Energy Info (EERE)

1-64ee-4c90-a183-8e036694c8a5 1-64ee-4c90-a183-8e036694c8a5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Lisbon, Wisconsin (Utility Company) Effective date: 2008/05/12 End date if known: Rate name: Cp-1 Small Power Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0523 per kilowatt-hour.

194

Data:B59adc90-8b9e-4910-bf72-b0d1eb4c4b77 | Open Energy Information  

Open Energy Info (EERE)

adc90-8b9e-4910-bf72-b0d1eb4c4b77 adc90-8b9e-4910-bf72-b0d1eb4c4b77 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Manitowoc Public Utilities Effective date: 2009/06/01 End date if known: Rate name: Cp-1 Small Power Service between Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0361 per kilowatt-hour.

195

Data:2d8b4b0b-a473-4dd8-9bf4-c218fdd36554 | Open Energy Information  

Open Energy Info (EERE)

b4b0b-a473-4dd8-9bf4-c218fdd36554 b4b0b-a473-4dd8-9bf4-c218fdd36554 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: General Service-Optional Time-of-Day Three Phase with Parallel Generation(20 kW or less)-Net Energy Billing Sector: Commercial Description: All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The current cost per kilowatt-hour of energy billed is equal to the cost of power purchased for the most recent month, divided by the kilowatt-hours of energy sold. The monthly adjustment (rounded to the nearest one one-hundredth of a cent) is equal to the current cost less the base cost. The base cost of power (U) is $0.0785 per kilowatt-hour.

196

Data:001e54c2-b58d-4c84-a4a1-4421fbfa06ca | Open Energy Information  

Open Energy Info (EERE)

c2-b58d-4c84-a4a1-4421fbfa06ca c2-b58d-4c84-a4a1-4421fbfa06ca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hustisford Utilities Effective date: 2009/09/30 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 8am-8pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0720 per kilowatt-hour.

197

Data:935b462e-f867-4c24-a3cf-a7ac6ba98a3b | Open Energy Information  

Open Energy Info (EERE)

2e-f867-4c24-a3cf-a7ac6ba98a3b 2e-f867-4c24-a3cf-a7ac6ba98a3b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Brodhead Water & Lighting Comm Effective date: 2010/02/15 End date if known: Rate name: General Service - GS-1 Three Phase Sector: Commercial Description: *POWER COST ADJUSTMENT CLAUSE (PCAC): All metered rates are subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt - hour of sales) is greater or lesser than the base cost of power purchased and produced (per kilowatt - hour of sales). Source or reference: http://www.brodheadlibrary.org/WaterandLightRatesandFees.cfm?Ratetype=Elec

198

Data:E9473217-04c6-4c86-97e2-a67831261362 | Open Energy Information  

Open Energy Info (EERE)

7-04c6-4c86-97e2-a67831261362 7-04c6-4c86-97e2-a67831261362 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cumberland, Wisconsin (Utility Company) Effective date: 2006/03/15 End date if known: Rate name: Ms-1 Street Lighting Service Overhead 175 W MV w/out pole Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0294per kilowatt-hour.

199

Data:5d0b965d-a4cb-440c-b8dc-7fea4c4dc573 | Open Energy Information  

Open Energy Info (EERE)

d-a4cb-440c-b8dc-7fea4c4dc573 d-a4cb-440c-b8dc-7fea4c4dc573 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Escanaba, Michigan (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Suburban Water Heating Energy Rate Commercial Sector: Commercial Description: To any customer for separately metered controlled water heating, subject to such wiring rules and regulations as are established by the utility. For as long as the City has costs associated with the ownership of the power plant, these costs shall be recovered through the following power plant cost adjustment factor:$0.01000 for all kWh, all service classes. State of Michigan P.A. 295, of Public Acts 2008, commonly referred to as the Clean, Renewable and Efficient Energy Act mandates the electric utility collect the following charges from each electric utility customer: Commercial $0.00200/kWh. The sum of these charges is reflected in adjustments to the energy charge.

200

Data:3140a227-362a-4c6c-b67d-c01173479546 | Open Energy Information  

Open Energy Info (EERE)

7-362a-4c6c-b67d-c01173479546 7-362a-4c6c-b67d-c01173479546 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Reedsburg Utility Comm Effective date: 2011/06/01 End date if known: Rate name: Cp-1 Small Power Service with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Data:4ee3cd08-a1ca-4c12-aad0-f84efa3f97d4 | Open Energy Information  

Open Energy Info (EERE)

cd08-a1ca-4c12-aad0-f84efa3f97d4 cd08-a1ca-4c12-aad0-f84efa3f97d4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconto Falls Water & Light Comm Effective date: 2010/10/13 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day Single Phase 9am-9pm with Parallel Generation(20kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0847 per kilowatt-hour.

202

Data:9c8f301b-3d74-4528-bfd6-1b4c1ca52cfe | Open Energy Information  

Open Energy Info (EERE)

f301b-3d74-4528-bfd6-1b4c1ca52cfe f301b-3d74-4528-bfd6-1b4c1ca52cfe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconto Falls Water & Light Comm Effective date: 2007/10/13 End date if known: Rate name: Ms-1 Street and Yard Lighting Service - Yard Lighting 150 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0847 per kilowatt-hour.

203

Data:25858c39-c553-4c8d-ae43-8eb19be30a6d | Open Energy Information  

Open Energy Info (EERE)

c39-c553-4c8d-ae43-8eb19be30a6d c39-c553-4c8d-ae43-8eb19be30a6d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Clintonville, Wisconsin (Utility Company) Effective date: 2006/05/05 End date if known: Rate name: Cp-4 Large Power Time-of-Day with Coincident Demand Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0680 per kWh. See schedule PCAC.

204

Data:773d0b31-adcd-4c0c-8238-906fec1d324e | Open Energy Information  

Open Energy Info (EERE)

b31-adcd-4c0c-8238-906fec1d324e b31-adcd-4c0c-8238-906fec1d324e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cumberland, Wisconsin (Utility Company) Effective date: 2006/03/15 End date if known: Rate name: Ms-1 Street Lighting Service Overhead 400 W HPS w/out pole Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0294per kilowatt-hour.

205

Data:D89a3102-fa51-4d96-90d4-c3827d6512dd | Open Energy Information  

Open Energy Info (EERE)

102-fa51-4d96-90d4-c3827d6512dd 102-fa51-4d96-90d4-c3827d6512dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Wisconsin (Utility Company) Effective date: 2006/02/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0549 per kWh. See schedule PCAC.

206

Data:E5fb37a3-1e26-4c71-9fa0-de9130075f37 | Open Energy Information  

Open Energy Info (EERE)

fb37a3-1e26-4c71-9fa0-de9130075f37 fb37a3-1e26-4c71-9fa0-de9130075f37 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2011/08/12 End date if known: Rate name: Ms-1 Street and Yard Lighting Service Ornamental 70 W MH(Double Fixture Faciltities) Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

207

Data:6b0a2698-e617-4833-a4ee-ecfb4c3bb474 | Open Energy Information  

Open Energy Info (EERE)

698-e617-4833-a4ee-ecfb4c3bb474 698-e617-4833-a4ee-ecfb4c3bb474 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Ms-1 Street Lighting Service 250 W MV Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0765 per kilowatt-hour.

208

Data:9da0e021-6d23-4c8c-8535-1d0541c6805f | Open Energy Information  

Open Energy Info (EERE)

e021-6d23-4c8c-8535-1d0541c6805f e021-6d23-4c8c-8535-1d0541c6805f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Reedsburg Utility Comm Effective date: 2011/06/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

209

Data:B1588094-73c6-4c27-967b-32806fc72fda | Open Energy Information  

Open Energy Info (EERE)

4-73c6-4c27-967b-32806fc72fda 4-73c6-4c27-967b-32806fc72fda No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of New Glarus, Wisconsin (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Cp-1 Small Power Service Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0721 per kilowatt-hour.

210

Data:Bdb07486-2157-4f28-b823-53995e4c5c06 | Open Energy Information  

Open Energy Info (EERE)

6-2157-4f28-b823-53995e4c5c06 6-2157-4f28-b823-53995e4c5c06 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New London Electric&Water Util Effective date: 2009/07/01 End date if known: Rate name: Gs-1 General Service Three Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0699 per kilowatt-hour.

211

Data:7986757c-77d2-4e7c-b0e8-ff4c855db800 | Open Energy Information  

Open Energy Info (EERE)

77d2-4e7c-b0e8-ff4c855db800 77d2-4e7c-b0e8-ff4c855db800 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Marshfield, Wisconsin (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0515 per kilowatt-hour.

212

Data:9227d6b8-9cf3-4c39-821b-5b1752c23277 | Open Energy Information  

Open Energy Info (EERE)

d6b8-9cf3-4c39-821b-5b1752c23277 d6b8-9cf3-4c39-821b-5b1752c23277 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northcentral Mississippi E P A Effective date: 2011/10/01 End date if known: Rate name: Outdoor Lighting HPS 100 W Sector: Lighting Description: *The energy charge in Part A and Part B of this rate schedule shall be increased or decreased in accordance with the current Adjustment Addendum published by TVA. In addition, the energy charge in Part A and Part B of this rate schedule shall be increased or decreased to correspond to increases or decreases determined by TVA under Adjustment 4 of the wholesale power rate schedule applicable under contractual arrangements between TVA and Distributor.

213

Data:Ccce67fa-d36a-4c7e-92f5-f1d92cb362f5 | Open Energy Information  

Open Energy Info (EERE)

Ccce67fa-d36a-4c7e-92f5-f1d92cb362f5 Ccce67fa-d36a-4c7e-92f5-f1d92cb362f5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Parke County Rural E M C Effective date: 2012/04/01 End date if known: Rate name: Rate Rider P (Rate 66) Prepaid Service Sector: Commercial Description: The Parke County REMC shall provide prepaid service to a single family residential dwelling. The charges for general residential electric service based on availability, application, character of service, monthly rate, minimum charge, purchased power cost adjustment clause, and tax adjustment. AVAILABILITY: This schedule is available to any residential member of Parke County REMC located within the territory served by Parke County REMC that would like to use the prepaid service to pay for service.

214

Data:48aa0bb5-0a9b-4c2a-886e-0bca674e3048 | Open Energy Information  

Open Energy Info (EERE)

bb5-0a9b-4c2a-886e-0bca674e3048 bb5-0a9b-4c2a-886e-0bca674e3048 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service between 1,000kW and 5,000 kW Demand 7am-9pm with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

215

Data:F6f392ea-b4c4-4353-9556-15642d65cb9b | Open Energy Information  

Open Energy Info (EERE)

b4c4-4353-9556-15642d65cb9b b4c4-4353-9556-15642d65cb9b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Mt Horeb, Wisconsin (Utility Company) Effective date: 2009/04/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 9am-9pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

216

Data:F791acc4-73ce-4c7d-b408-0c8eee8ad23c | Open Energy Information  

Open Energy Info (EERE)

acc4-73ce-4c7d-b408-0c8eee8ad23c acc4-73ce-4c7d-b408-0c8eee8ad23c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Clintonville, Wisconsin (Utility Company) Effective date: 2006/05/05 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0680 per kWh. See schedule PCAC.

217

Data:30587f8e-cec1-43d5-8ee8-2712e4c93a05 | Open Energy Information  

Open Energy Info (EERE)

cec1-43d5-8ee8-2712e4c93a05 cec1-43d5-8ee8-2712e4c93a05 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Sauk City, Wisconsin (Utility Company) Effective date: 2008/08/18 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0756 per kilowatt-hour.

218

Data:8743f8ef-7b15-4c89-a8bc-9d8f5775343e | Open Energy Information  

Open Energy Info (EERE)

ef-7b15-4c89-a8bc-9d8f5775343e ef-7b15-4c89-a8bc-9d8f5775343e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New London Electric&Water Util Effective date: 2009/07/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0699 per kilowatt-hour.

219

Data:Abd86183-b9f0-4c51-829a-9c0311354510 | Open Energy Information  

Open Energy Info (EERE)

3-b9f0-4c51-829a-9c0311354510 3-b9f0-4c51-829a-9c0311354510 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2010/02/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

220

Data:864467c5-6f90-4c7c-8e81-a768aa1d02bf | Open Energy Information  

Open Energy Info (EERE)

67c5-6f90-4c7c-8e81-a768aa1d02bf 67c5-6f90-4c7c-8e81-a768aa1d02bf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lodi, Wisconsin (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0811 per kilowatt-hour.

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Data:1cf55c9d-a1fd-4815-8f9a-c4c4aeafae90 | Open Energy Information  

Open Energy Info (EERE)

5c9d-a1fd-4815-8f9a-c4c4aeafae90 5c9d-a1fd-4815-8f9a-c4c4aeafae90 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Guntersville Electric Board Effective date: 2012/10/01 End date if known: Rate name: SDE SGSC Sector: Industrial Description: Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments *Subject to Revenue adjustment,environmental adjustment and FCA Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

222

Data:E90960ff-768f-4bfd-9b0e-b7bca1f4c5b4 | Open Energy Information  

Open Energy Info (EERE)

768f-4bfd-9b0e-b7bca1f4c5b4 768f-4bfd-9b0e-b7bca1f4c5b4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Sauk City, Wisconsin (Utility Company) Effective date: 2008/08/18 End date if known: Rate name: Cp-1 Small Power Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0756 per kilowatt-hour.

223

Data:96e43bdb-3727-4c81-9cd2-19caa82167cd | Open Energy Information  

Open Energy Info (EERE)

3bdb-3727-4c81-9cd2-19caa82167cd 3bdb-3727-4c81-9cd2-19caa82167cd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Wisconsin (Utility Company) Effective date: 2006/02/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0549 per kWh. See schedule PCAC.

224

Data:545cd2ce-58ec-4270-a1f2-e4c583e54004 | Open Energy Information  

Open Energy Info (EERE)

cd2ce-58ec-4270-a1f2-e4c583e54004 cd2ce-58ec-4270-a1f2-e4c583e54004 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2011/08/12 End date if known: Rate name: Ms-1 Street and Yard Lighting Service Ornamental 250 W MH (Single Head Facilitity) Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

225

Data:14faae23-3377-4b11-a70a-aec5c6f00a4c | Open Energy Information  

Open Energy Info (EERE)

faae23-3377-4b11-a70a-aec5c6f00a4c faae23-3377-4b11-a70a-aec5c6f00a4c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tell City, Indiana (Utility Company) Effective date: 2009/09/01 End date if known: Rate name: Tariff FP: 75 to 1000 KVA Three Phase Floodwall Pumping Sector: Lighting Description: The charges derived in the Tariff FP rate are subject to adjustment for: Purchased Power Adjustment Tracking Factor. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

226

Data:57f0444f-bdee-4c42-b015-acf6c2034ff5 | Open Energy Information  

Open Energy Info (EERE)

44f-bdee-4c42-b015-acf6c2034ff5 44f-bdee-4c42-b015-acf6c2034ff5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Miami-Cass County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Residential with Envirowatts Sector: Residential Description: The Miami-Cass County Rural Electric Membership Corporation (REMC) shall charge and collect for residential electric service on the following bases of availability, application, character of service, monthly rate, minimum charge, purchased power cost adjustment clause, and tax adjustment. AVAILABILITY: This schedule is available to any member of the REMC located within the territory served by Miami-Cass County Rural Electric Membership Corporation. The REMC has a limited amount of Enviro-Watts power available and it will be available on a first come first serve basis.

227

Data:825a37d3-b411-4c7d-8f61-d9c0f127e120 | Open Energy Information  

Open Energy Info (EERE)

7d3-b411-4c7d-8f61-d9c0f127e120 7d3-b411-4c7d-8f61-d9c0f127e120 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland Center, Wisconsin (Utility Company) Effective date: 2007/07/09 End date if known: Rate name: Gs-1 General Service Single Phase Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0582 per kilowatt-hour.

228

Data:7a1daa31-80a4-4c91-ba11-30b5e2bb4fbd | Open Energy Information  

Open Energy Info (EERE)

daa31-80a4-4c91-ba11-30b5e2bb4fbd daa31-80a4-4c91-ba11-30b5e2bb4fbd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lake Mills Light & Water Effective date: 2009/06/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand 7am-9pm Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0767 per kilowatt-hour.

229

Data:C01b5717-123d-4c96-b4a4-3eee5f91b328 | Open Energy Information  

Open Energy Info (EERE)

b5717-123d-4c96-b4a4-3eee5f91b328 b5717-123d-4c96-b4a4-3eee5f91b328 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbia River Peoples Ut Dist Effective date: 2011/10/01 End date if known: Rate name: General Service - Greater Than 400 Amp Service Sector: Commercial Description: To commercial and general service Customers not subject to other specific rate schedules whose service entrance requirements are either, single-phase service and exceed 400 amps, or three-phase service and exceed 200 amps, and with a peak monthly load of less than 1,875 kW. BPA Power Cost Adjustment All applicable BPA Power Cost Adjustment charges per Rate Schedule 94 shall apply to all kWh's billed to Customers under this Rate Schedule.. Average Power Factor Charge

230

Data:1783d78a-6e8c-4cd0-8793-86daa4c341c3 | Open Energy Information  

Open Energy Info (EERE)

8a-6e8c-4cd0-8793-86daa4c341c3 8a-6e8c-4cd0-8793-86daa4c341c3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Prairie Du Sac, Wisconsin (Utility Company) Effective date: 2009/07/06 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day with Parallel Generation(20kW or less) 7am-7pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0583 per kilowatt-hour.

231

Data:Fa6921ea-7133-4c9f-a065-726e866b7521 | Open Energy Information  

Open Energy Info (EERE)

921ea-7133-4c9f-a065-726e866b7521 921ea-7133-4c9f-a065-726e866b7521 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of New Glarus, Wisconsin (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 400 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0721 per kilowatt-hour.

232

Data:Ac26c2cb-b687-4c43-bdea-b74325cb024a | Open Energy Information  

Open Energy Info (EERE)

Ac26c2cb-b687-4c43-bdea-b74325cb024a Ac26c2cb-b687-4c43-bdea-b74325cb024a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 5,000kW Demand 8am-8pm Primary Metering Discount (above 15,000 volts)with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

233

Data:0c72a148-276f-4ef5-8536-4d4c3d7e0ab7 | Open Energy Information  

Open Energy Info (EERE)

a148-276f-4ef5-8536-4d4c3d7e0ab7 a148-276f-4ef5-8536-4d4c3d7e0ab7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Princeton, Wisconsin (Utility Company) Effective date: 2006/09/14 End date if known: Rate name: Ms-1 Street Lighting Service Overhead 250 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0524 per kilowatt-hour.

234

Data:Faa585a9-8a29-4c76-89a1-ad691a73fc07 | Open Energy Information  

Open Energy Info (EERE)

Faa585a9-8a29-4c76-89a1-ad691a73fc07 Faa585a9-8a29-4c76-89a1-ad691a73fc07 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Sauk City, Wisconsin (Utility Company) Effective date: 2008/08/18 End date if known: Rate name: Rg-1 Residential Service Three Phase with Parallel Generation(20kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0756 per kilowatt-hour.

235

Data:85b3150d-a0f4-4ce0-bd4c-bdd147190983 | Open Energy Information  

Open Energy Info (EERE)

0d-a0f4-4ce0-bd4c-bdd147190983 0d-a0f4-4ce0-bd4c-bdd147190983 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2011/08/12 End date if known: Rate name: Ms-1 Street and Yard Lighting Service Overhead 50 W LED (100% contribution) Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

236

Data:057bd1f0-cec2-48f5-93db-7dd4c7cfeba1 | Open Energy Information  

Open Energy Info (EERE)

bd1f0-cec2-48f5-93db-7dd4c7cfeba1 bd1f0-cec2-48f5-93db-7dd4c7cfeba1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 9am-9pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

237

Data:B4570915-26a5-40bd-b478-4c8467dcecba | Open Energy Information  

Open Energy Info (EERE)

0915-26a5-40bd-b478-4c8467dcecba 0915-26a5-40bd-b478-4c8467dcecba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cumberland, Wisconsin (Utility Company) Effective date: 2006/03/15 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand Primary Metering and Transformer Ownership Discount with Parallel Generation(20 kW or less)- Net Energy Billing Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0294per kilowatt-hour.

238

Data:115a2d4e-3bb1-4c3a-8056-9a92ca16173f | Open Energy Information  

Open Energy Info (EERE)

15a2d4e-3bb1-4c3a-8056-9a92ca16173f 15a2d4e-3bb1-4c3a-8056-9a92ca16173f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 9am-9pm with Parallel Generation(20kW or less)-Net Energy Billing Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

239

Data:Ad7b4c41-2166-40b3-bb9b-6216d1b55b02 | Open Energy Information  

Open Energy Info (EERE)

b4c41-2166-40b3-bb9b-6216d1b55b02 b4c41-2166-40b3-bb9b-6216d1b55b02 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Irrigation Controlled Sector: Commercial Description: *Applicable to any irrigation usage served by the City of Gothenburg. Irrigation season is from April-September. Non-summer months of the irrigation season (April/May) will be billed at the commercial general service rate. Subject to production cost adjustment and power factor adjustment. Source or reference: http://www.ci.gothenburg.ne.us/Ordinances/2010_Current/868%20Utility%20Rates.pdf

240

Data:Afa0d3f6-fc4c-42cb-ad0a-a557b4035606 | Open Energy Information  

Open Energy Info (EERE)

Afa0d3f6-fc4c-42cb-ad0a-a557b4035606 Afa0d3f6-fc4c-42cb-ad0a-a557b4035606 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Sauk City, Wisconsin (Utility Company) Effective date: 2008/08/18 End date if known: Rate name: Ms-2 Athletic Field Lighting Service Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0756 per kilowatt-hour.

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Data:8087cae8-4989-4c98-920b-266ba0f090cf | Open Energy Information  

Open Energy Info (EERE)

cae8-4989-4c98-920b-266ba0f090cf cae8-4989-4c98-920b-266ba0f090cf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service between 200kW and 1,000kW Demand Transformer Ownership Discount-Net Metering(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0509 per kilowatt-hour.

242

Data:644882b0-a4c6-4f90-abc7-a502c92d87a1 | Open Energy Information  

Open Energy Info (EERE)

82b0-a4c6-4f90-abc7-a502c92d87a1 82b0-a4c6-4f90-abc7-a502c92d87a1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Marshfield, Wisconsin (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 500kW Demand Secondary Voltage Metering and Secondary Voltage Service with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0515 per kilowatt-hour.

243

Interfacial microstructure in a B{sub 4}C/Al composite fabricated by pressureless infiltration.  

SciTech Connect

In this work, B{sub 4}C particulate-reinforced Al composite was fabricated by a pressureless infiltration technique, and its interfacial microstructure was studied in detail by X-ray diffraction as well as by scanning and transmission electron microscopy. The B{sub 4}C phase was unstable in Al melt during the infiltration process, forming AlB{sub 10}-type AlB{sub 24}C{sub 4} or Al{sub 2.1}B{sub 51}C{sub 8} as a major reactant phase. The Al matrix was large grains (over 10 {micro}m), which had no definite orientation relationships (ORs) with the randomly orientated B{sub 4}C or its reactant particles, except for possible nucleation sites with {l_brace}011{r_brace}{sub B{sub 4}C} almost parallel to {l_brace}111{r_brace}{sub Al} at a deviation angle of 1.5 deg. Both B{sub 4}C-Al and reactant-Al interfaces are semicoherent and free of other phases. A comparison was made with the SiC/Al composite fabricated similarly by the pressureless infiltration. It was suggested that the lack of ORs between the Al matrix and reinforced particles, except for possible nucleation sites, is the common feature of the composites prepared by the infiltration method.

Luo, Z.; Song, Y.; Zhang, S.; Miller, D. J. (Materials Science Division); (Teaxas A& M Univ.); (Beijing Inst. Aeronautical Mater.)

2012-01-01T23:59:59.000Z

244

Natural Gas Underground Storage Capacity (Summary)  

Gasoline and Diesel Fuel Update (EIA)

Salt Caverns Storage Capacity Aquifers Storage Capacity Depleted Fields Storage Capacity Total Working Gas Capacity Working Gas Capacity of Salt Caverns Working Gas Capacity of...

245

Increasing State Capacity Through Clans  

E-Print Network (OSTI)

their role in increasing state capacity With the decline ofhere focus on state capacity and the associated discussionselements of state capacity during the transition from one

Doyle, Jr, Thomas Martin

2009-01-01T23:59:59.000Z

246

Capacity Markets for Electricity  

E-Print Network (OSTI)

Designing Markets for Electricity. Wiley IEEE Press. [25]in the England and Wales Electricity Market, Power WorkingFelder (1996), Should Electricity Markets Have a Capacity

Creti, Anna; Fabra, Natalia

2004-01-01T23:59:59.000Z

247

ORISE: Capacity Building  

NLE Websites -- All DOE Office Websites (Extended Search)

Capacity Building Because public health agencies must maintain the resources to respond to public health challenges, critical situations and emergencies, the Oak Ridge Institute...

248

Data:742db4f6-7a80-4c3a-b46e-ec7ad60a69f7 | Open Energy Information  

Open Energy Info (EERE)

db4f6-7a80-4c3a-b46e-ec7ad60a69f7 db4f6-7a80-4c3a-b46e-ec7ad60a69f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Security Lighting HPS 150 W Flood Sector: Lighting Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. Source or reference: http://www.singingriver.com/Files/R-18.pdf Source Parent: Comments Energy Adjustment is Power Cost Adjustment plus Environmental Clause plus Regulatory Adjustment Applicability Demand (kW) Minimum (kW):

249

Data:7c4c7321-debd-4c8c-9782-6b3eea3fdd0f | Open Energy Information  

Open Energy Info (EERE)

21-debd-4c8c-9782-6b3eea3fdd0f 21-debd-4c8c-9782-6b3eea3fdd0f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hart Electric Member Corp Effective date: 2006/10/01 End date if known: Rate name: Schedule L-10 Lighting Service 250 Watt High Pressure Sodium Flood Sector: Lighting Description: AVAILABILITY Available in all territory served by the Corporation in accordance with the Corporation's Service Rules and Regulations. APPLICABILITY Applicable for electric service supplied to provide dusk to dawn lighting of consumer's property by means of photo-electric controlled, ballast operated mercury or sodium vapor or metal halide luminaries, and poles conforming to the Corporation's specifications, and where secondary service is available, subject to the established Service Rules and Regulations of the Corporation.

250

Capacity on Finsler Spaces  

E-Print Network (OSTI)

Here, the concept of electric capacity on Finsler spaces is introduced and the fundamental conformal invariant property is proved, i.e. the capacity of a compact set on a connected non-compact Finsler manifold is conformal invariant. This work enables mathematicians and theoretical physicists to become more familiar with the global Finsler geometry and one of its new applications.

Bidabad, B

2009-01-01T23:59:59.000Z

251

Liquid heat capacity lasers  

DOE Patents (OSTI)

The heat capacity laser concept is extended to systems in which the heat capacity lasing media is a liquid. The laser active liquid is circulated from a reservoir (where the bulk of the media and hence waste heat resides) through a channel so configured for both optical pumping of the media for gain and for light amplification from the resulting gain.

Comaskey, Brian J. (Walnut Creek, CA); Scheibner, Karl F. (Tracy, CA); Ault, Earl R. (Livermore, CA)

2007-05-01T23:59:59.000Z

252

capacity | OpenEI  

Open Energy Info (EERE)

capacity capacity Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 9, and contains only the reference case. The dataset uses gigawatts. The data is broken down into power only, combined heat and power, cumulative planned additions, cumulative unplanned conditions, and cumulative retirements and total electric power sector capacity . Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO capacity consumption EIA Electricity generating Data application/vnd.ms-excel icon AEO2011: Electricity Generating Capacity- Reference Case (xls, 130.1 KiB) Quality Metrics Level of Review Peer Reviewed Comment

253

Battery capacity indicator  

SciTech Connect

This patent describes a battery capacity indicator for providing a continuous indication of battery capacity for a battery powered device. It comprises means for periodically effecting a first and a second positive discharge rate of the battery; voltage measurement means, for measuring the battery terminal voltage at the first and second positive discharge rates during the operation of the device, and for generating a differential battery voltage value in response thereto; memory means for storing a set of predetermined differential battery voltage values and a set of predetermined battery capacity values, each of the set of predetermined differential battery voltage values defining one of the set of predetermined battery capacity values; comparison means, coupled to the memory means and to the voltage measurement means, for comparing the measured differential battery voltage values with the set of predetermined differential battery voltage values, and for selecting the predetermined battery capacity value corresponding thereto.

Kunznicki, W.J.

1991-07-16T23:59:59.000Z

254

Data:E987fb15-0aec-4c4d-a28d-c3b085c5932d | Open Energy Information  

Open Energy Info (EERE)

fb15-0aec-4c4d-a28d-c3b085c5932d fb15-0aec-4c4d-a28d-c3b085c5932d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kankakee Valley Rural E M C Effective date: 2012/05/01 End date if known: Rate name: Rate Schedule SPTOU: Seasonal Power Time-of-Use Service Sector: Commercial Description: The Kankakee Valley Membership Corporation (REMC) shall charge and collect for seasonal time-of-use service on the bases of availability, application, character of service, monthly rate, definitions, determination of supplemental and standby service, specified capacity, and special provisions. AVAILABILITY: This schedule is available to any member requiring seasonal service of not less than twenty-five (25) KVA of installed transformer capacity. CHARACTER OF SERVICE: Service under this schedule shall be single phase or three phase, 60 Hertz, alternating current at standard available voltages. Resale service is not permitted under this rate schedule. LIMITATION OF SERVICE: Service under this schedule is permitted only for customers whose generating equipment is used only for emergency purposes.

255

Data:8007ba25-d227-4c06-b4f2-2149b4cc9684 | Open Energy Information  

Open Energy Info (EERE)

ba25-d227-4c06-b4f2-2149b4cc9684 ba25-d227-4c06-b4f2-2149b4cc9684 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sun River Electric Coop, Inc Effective date: 2012/01/01 End date if known: Rate name: Residential Sector: Residential Description: * Single phase, 60 cycles, at available secondary voltage. To all members whose accounts include a residence requiring single phase service for a period of more than six (6) months each year and at less than 50 KVA capacity and with an annual usage of at least 4000 kwh, subject to other rules and regulations of the cooperative. The total capacity of any single phase motor under this schedule shall not exceed 10 HP without written permission of the Cooperative.

256

Data:873baff3-174f-491f-a4c4-7c1d016cc484 | Open Energy Information  

Open Energy Info (EERE)

baff3-174f-491f-a4c4-7c1d016cc484 baff3-174f-491f-a4c4-7c1d016cc484 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Eastern Illinois Elec Coop Effective date: 2010/09/01 End date if known: Rate name: SINGLE-PHASE - PREPAID ADVANTAGE RATE SCHEDULE NO. 7 Sector: Commercial Description: This rate is made available in accordance with Regulation No. 29 - PREPAID ADVANTAGE and is available to member/owners for all uses, subject to established regulations of Eastern Illini Electric Cooperative, Inc. (Cooperative). Service under this schedule is available to installations requiring fifty (50) kVA or less of transformer capacity and service capacity of 200 amperes or less. This rate provides member/owners with the opportunity to have better control over their electric energy budgets and cash flow by allowing them to purchase electric energy in the amounts they need and when they want to make the purchase.

257

Data:5b922226-bd87-4c62-8131-92dab00de11d | Open Energy Information  

Open Energy Info (EERE)

6-bd87-4c62-8131-92dab00de11d 6-bd87-4c62-8131-92dab00de11d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp Effective date: 2012/01/01 End date if known: Rate name: Church Demand - Single Phase Sector: Commercial Description: Minimum Monthy Charge:The minimum monthly charge will be the greater of: 1. $30.00 for single-phase service, plus $2.62 per kW of Billing Demand in excess of 15 kW, plus any additional charge for excess capacity, or 2. $0.78 per kVA of installed transformer capacity. Monthly Rate: First 20 kWh or less $30.00 per mo. Next 1,980 kWh 15.0¢ per kWh

258

Data:A384e673-627e-4c3b-bf30-287829ad2cc7 | Open Energy Information  

Open Energy Info (EERE)

4e673-627e-4c3b-bf30-287829ad2cc7 4e673-627e-4c3b-bf30-287829ad2cc7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Park Electric Coop Inc Effective date: End date if known: Rate name: Residential - Small Sector: Residential Description: * Service on this schedule is limited to single phase consumers requiring not more than 50 KVA of installed transformer capacity. Park Electric will provide as standard service, up to 200 Amp capacity for the base rate. Over 200 Amp service will be $.50 per KVA in excess of 15 KVA plus the base rate. Line extension minimums under contract will supersede these minimums, if the line extension minimum is higher.

259

Data:5ff919b6-1637-4c4d-a21a-9251bc58e65d | Open Energy Information  

Open Energy Info (EERE)

ff919b6-1637-4c4d-a21a-9251bc58e65d ff919b6-1637-4c4d-a21a-9251bc58e65d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconee Electric Member Corp Effective date: 2009/05/01 End date if known: Rate name: Large Power Service Sector: Commercial Description: Applicable to electric service of one standard secondary voltage required on customer's premises, delivered at one point and metered at or compensated to that voltage. Applicable to customers with over 50 kVA of required transformer capacity. Also applicable to any customer with 50 kVA or less of required transformer capacity, provided that such customer has elected to receive service hereunder according to the requirements set forth in the APPLICABILITY provision of Schedule "GS".

260

Data:002f8a66-bbeb-4c94-a163-2f8a380904c5 | Open Energy Information  

Open Energy Info (EERE)

02f8a66-bbeb-4c94-a163-2f8a380904c5 02f8a66-bbeb-4c94-a163-2f8a380904c5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indianapolis Power & Light Co Effective date: 2010/03/30 End date if known: Rate name: SL - Secondary Service (LARGE) Sector: Industrial Description: AVAILABILITY: Available to any alternating current Customer for lighting and/or power service who will contract for not less than fifty (50) kilowatts of demand. CHARACTER OF SERVICE: Sixty cycle alternating current energy, ordinarily delivered and measured at 120/240 volts single phase three wire, 120/240 volts three phase four wire, 120/208 volts three phase four wire or 277/480 volts three phase four wire, which voltage will be designated by the Company, and through a single metering installation. If the Company, at its option, measures all the energy at the primary side of the transformers (4160 volts or 13,200 volts), the following deductions will be made in the meter readings: Two and one-half percent (2½%) will be deducted from the KW of demand established by the Customer during the month and two and one-half percent (2½%) will be deducted from the KWH consumed. No discount will be allowed where any part of energy is utilized at primary voltage. TRANSFORMER OWNERSHIP: All transformers and supplementary equipment will be owned, installed, operated and maintained by the Company. No discount will be allowed for Customer ownership of transformation facilities. RATE: The Customer Charge; plus the sum of the Demand Charge and the Energy Charge adjusted according to the "Power Factor" clause shown hereafter; plus the Demand Side Management Adjustment, the Fuel Cost Adjustment, the Environmental Compliance Cost Recovery Adjustment and the Core and Core Plus Demand- Side Management Adjustment calculated in accordance with Rider No. 3, Rider No. 6, Rider No. 20 and Rider No. 22, respectively.

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Adjustable extender for instrument module  

DOE Patents (OSTI)

A blank extender module used to mount an instrument module in front of its console for repair or test purposes has been equipped with a rotatable mount and means for locking the mount at various angles of rotation for easy accessibility. The rotatable mount includes a horizontal conduit supported by bearings within the blank module. The conduit is spring-biased in a retracted position within the blank module and in this position a small gear mounted on the conduit periphery is locked by a fixed pawl. The conduit and instrument mount can be pulled into an extended position with the gear clearing the pawl to permit rotation and adjustment of the instrument.

Sevec, J.B.; Stein, A.D.

1975-11-01T23:59:59.000Z

262

Adjustable Speed Drive Industrial Applications  

E-Print Network (OSTI)

Electric motors are significant users of electricity in the United States. Approximately 66 percent of the total electricity in the U.S. is used by electric motors. Electronic adjustable speed drives (ASDs) can save energy, lower maintenance cost and improve product quality. By providing a variable frequency output to ac motors the speed of the motors can be controlled and matched to the process requirements. The benefits that may be derived from using ASDs are described and the type of ASDs, applications and specific case studies of ASD installations are also discussed.

Poole, J. N.

1989-09-01T23:59:59.000Z

263

Lateral Capacity Exchange and Its Impact on Capacity Investment Decisions  

E-Print Network (OSTI)

We study the problem of capacity exchange between two rms in anticipation of the mismatch between demand and capacity and its impact on rms capacity investment decisions. For given capacity investment levels of the two rms, we demonstrate how capacity price may be determined and how much capacity should be exchanged when either manufacturer acts as a Stackelberg leader in the capacity exchange game. By benchmarking against the centralized system, we show that a side payment may be used to coordinate the capacity exchange decisions. We then study the rmscapacity investment decisions using a biform game framework in which capacity investment decisions are made individually and exchange decisions are made as in a centralized system. We demonstrate the existence and uniqueness of the Nash equilibrium capacity investment levels and study the impact of rmsshare of the capacity exchange surplus on their capacity investment levels.

Amiya K. Chakravartyz; Jun Zhangy

2005-01-01T23:59:59.000Z

264

Capacity Markets for Electricity  

E-Print Network (OSTI)

Global Agenda, August 15. [6] FERC, Docket No. EL01-63-003,at http://www.pjm.com. [7] FERC, Docket No. ER01-1440-capacity of the others (FERC, 2001). Therefore, if an LSE

Creti, Anna; Fabra, Natalia

2004-01-01T23:59:59.000Z

265

Refinery Capacity Report 2007  

Reports and Publications (EIA)

Data series include fuel, electricity, and steam purchased for consumption at the refinery; refinery receipts of crude oil by method of transportation; current and projected capacities for atmospheric crude oil distillation, downstream charge, production, and storage capacities. Respondents are operators of all operating and idle petroleum refineries (including new refineries under construction) and refineries shut down during the previous year, located in the 50 States, the District of Columbia, Puerto Rico, the Virgin Islands, Guam, and other U.S. possessions.

Information Center

2007-06-29T23:59:59.000Z

266

Refinery Capacity Report 2009  

Reports and Publications (EIA)

Data series include fuel, electricity, and steam purchased for consumption at the refinery; refinery receipts of crude oil by method of transportation; current and projected capacities for atmospheric crude oil distillation, downstream charge, production, and storage capacities. Respondents are operators of all operating and idle petroleum refineries (including new refineries under construction) and refineries shut down during the previous year, located in the 50 States, the District of Columbia, Puerto Rico, the Virgin Islands, Guam, and other U.S. possessions.

Information Center

2009-06-25T23:59:59.000Z

267

Refinery Capacity Report 2008  

Reports and Publications (EIA)

Data series include fuel, electricity, and steam purchased for consumption at the refinery; refinery receipts of crude oil by method of transportation; current and projected capacities for atmospheric crude oil distillation, downstream charge, production, and storage capacities. Respondents are operators of all operating and idle petroleum refineries (including new refineries under construction) and refineries shut down during the previous year, located in the 50 States, the District of Columbia, Puerto Rico, the Virgin Islands, Guam, and other U.S. possessions.

Information Center

2008-06-20T23:59:59.000Z

268

Forward capacity market CONEfusion  

Science Conference Proceedings (OSTI)

In ISO New England and PJM it was assumed that sponsors of new capacity projects would offer them into the newly established forward centralized capacity markets at prices based on their levelized net cost of new entry, or ''Net CONE.'' But the FCCMs have not operated in the way their proponents had expected. To clear up the CONEfusion, FCCM designs should be reconsidered to adapt them to the changing circumstances and to be grounded in realistic expectations of market conduct. (author)

Wilson, James F.

2010-11-15T23:59:59.000Z

269

Interaction of ultrashort X-ray pulses with B4C, SiC and Si  

E-Print Network (OSTI)

The interaction of 32.5 and 6 nm ultrashort X-ray pulses with the solid materials B4C, SiC and Si is simulated with a non-local thermodynamic equilibrium (NLTE) radiation transfer code. We study the ionization dynamics as function of depth in the material, modifications of the opacity during irradiation and estimate crater depth. Furthermore, we compare the estimated crater depth with experimental data, for fluences up to 2.2 J/cm2. Our results show that at 32.5 nm irradiation, the opacity changes with less than a factor of 2 for B4C and Si and a factor of 3 for SiC, for fluences up to 200 J/cm2. At a laser wavelength of 6 nm, the model predicts a dramatic decrease in opacity due to the weak inverse bremsstrahlung, increasing the crater depth for high fluences.

Bergh, M; Hau-Riege, S P; Scott, H A

2007-01-01T23:59:59.000Z

270

Data:Ae14f0d7-546c-421c-a4c9-02db9ff3a4de | Open Energy Information  

Open Energy Info (EERE)

Ae14f0d7-546c-421c-a4c9-02db9ff3a4de Ae14f0d7-546c-421c-a4c9-02db9ff3a4de No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota Effective date: 2012/05/01 End date if known: Rate name: SMALL GENERAL SERVICE Unmetered (A09) Sector: Commercial Description: Standard service (i.e., alternating current) is available to any non-residential customer for single or three phase electric service. Direct Current service is only available in Minneapolis and St. Paul to the extent now used. Demand Charge (Direct Current Only) per Month per kW of Connected Load $3.03 DETERMINATION OF CUSTOMER BILLS Customer bills shall reflect energy charges (if applicable) based on customer's kWh usage, plus a customer charge (if applicable), plus demand charges (if applicable) based on customer's kW billing demand as defined. INTERIM RATE ADJUSTMENT A 4.49% Interim Rate Surcharge will be applied to rate components specified in the "Interim Rate Surcharge Rider." In addition, customer bills under this rate are subject to the following adjustments and/or charges. FUEL CLAUSE Bills are subject to the adjustments provided for in the Fuel Clause Rider. RESOURCE ADJUSTMENT Bills are subject to the adjustments provided for in the Conservation Improvement Program Adjustment Rider, the State Energy Policy Rate Rider, the Renewable Development Fund Rider, the Transmission Cost Recovery Rider, the Renewable Energy Standard Rider and the Mercury Cost Recovery Rider.

271

Data:31eb57d8-6775-4c29-9e3b-3e97299c2911 | Open Energy Information  

Open Energy Info (EERE)

7d8-6775-4c29-9e3b-3e97299c2911 7d8-6775-4c29-9e3b-3e97299c2911 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2011/09/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 5 Outdoor Lighting Service - ESS Shoebox Metal Halide 1000W Sector: Lighting Description: APPLICABLE TO THE USE OF SERVICE FOR: Outdoor lighting for residential and general service customers where applicable electric service is available. Flat rate Adjustments = Transition Charge. Source or reference: http://www.nyseg.com/MediaLibrary/2/5/Content%20Management/NYSEG/SuppliersPartners/PDFs%20and%20Docs/PSC120ServiceClassification_5.pdf

272

Data:04aaea2c-5806-4c1f-bdc0-643d7a506b63 | Open Energy Information  

Open Energy Info (EERE)

aaea2c-5806-4c1f-bdc0-643d7a506b63 aaea2c-5806-4c1f-bdc0-643d7a506b63 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL- Metal Halide 250w Sector: Lighting Description: Applicable to the Colorado Department of Transportation and municipalities for Customer-Owned Lighting Service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

273

Data:2f53ca0a-bfa9-4c88-bfc3-82f7258afeef | Open Energy Information  

Open Energy Info (EERE)

a-bfa9-4c88-bfc3-82f7258afeef a-bfa9-4c88-bfc3-82f7258afeef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2011/09/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 5 Outdoor Lighting Service - NSS Area Light Mercury 100W Sector: Lighting Description: APPLICABLE TO THE USE OF SERVICE FOR: Outdoor lighting for residential and general service customers where applicable electric service is available. Flat rate Adjustments = Transition Charge+MFC. Bill Issuance Charge (per bill): $0.73, as described in General Information Section 16.J. and applicable to those customers where charges for this service classification are the only charges that appear on the customer's bill.

274

Data:65b78f14-9fbe-4964-92e7-15a4c14f2da0 | Open Energy Information  

Open Energy Info (EERE)

f14-9fbe-4964-92e7-15a4c14f2da0 f14-9fbe-4964-92e7-15a4c14f2da0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2011/09/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 5 Outdoor Lighting Service - ESS Flood Lights Metal Halide 1000W Sector: Lighting Description: APPLICABLE TO THE USE OF SERVICE FOR: Outdoor lighting for residential and general service customers where applicable electric service is available. Flat rate Adjustments = Transition Charge. Source or reference: http://www.nyseg.com/MediaLibrary/2/5/Content%20Management/NYSEG/SuppliersPartners/PDFs%20and%20Docs/PSC120ServiceClassification_5.pdf

275

Data:1a4d8382-4c85-4ead-99f6-924c97e42f7e | Open Energy Information  

Open Energy Info (EERE)

382-4c85-4ead-99f6-924c97e42f7e 382-4c85-4ead-99f6-924c97e42f7e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Stratford, Wisconsin (Utility Company) Effective date: 2008/11/18 End date if known: Rate name: Residential- Single- Phase- Time-of-Day- Peak: 9am-9pm Sector: Residential Description: This rate schedule is optional to all Rg-1, Residential Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

276

Data:0896dce6-d4cf-4c36-8d2b-7bf78a7d3832 | Open Energy Information  

Open Energy Info (EERE)

dce6-d4cf-4c36-8d2b-7bf78a7d3832 dce6-d4cf-4c36-8d2b-7bf78a7d3832 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kaw Valley Electric Coop Inc Effective date: 2012/02/01 End date if known: Rate name: Irrigation Service (40) Sector: Commercial Description: There is a Horse Power Charge of $2 The Flat rate Adjustments fluctuates with the Cooperative's Wholesale Power Cost. Source or reference: http://www.kve.coop/elecRates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

277

Data:B400dafc-8277-4c64-b21b-887fe880a1fe | Open Energy Information  

Open Energy Info (EERE)

dafc-8277-4c64-b21b-887fe880a1fe dafc-8277-4c64-b21b-887fe880a1fe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Cp-1TOD; Small Power Optional Time-of-Day Service-Transformer Ownership Discount and Primary Metering Discount-20kW or less-Net Energy Billing) Sector: Commercial Description: This rate schedule is optional to all Cp-1 customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

278

Data:73716e11-880e-4c7d-8e2b-c6d5cac5a76b | Open Energy Information  

Open Energy Info (EERE)

-880e-4c7d-8e2b-c6d5cac5a76b -880e-4c7d-8e2b-c6d5cac5a76b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sauk Centre, Minnesota (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Residential annexed service - Dual Meter/Heat pump Sector: Residential Description: Energy adjustment base average = $0.054/kwh (E.A. base would vary each month based on projected power costs.) Source or reference: http://www.saukcentre.govoffice2.com/vertical/sites/%7BD28FAE32-EDE3-421C-BD2D-FA8E76EA5F8C%7D/uploads/Operational_Policy_Rate_Schedule_2012_final.pdf Source Parent:

279

Data:91c19fae-c219-4c87-b9e8-a22c238fd1b0 | Open Energy Information  

Open Energy Info (EERE)

fae-c219-4c87-b9e8-a22c238fd1b0 fae-c219-4c87-b9e8-a22c238fd1b0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: A & N Electric Coop Effective date: 2008/01/02 End date if known: Rate name: Former Delmarva Power Territory: Private Area Lighting-Enclosed Bottom-High Pressure Sodium-70 W Sector: Lighting Description: Estimated Average Monthly Usage: 36kWh Rates are subject to wholesale power cost adjustments. Terms and conditions apply. Source or reference: http://www.anec.com/yourbill/rate_pdfs/AST_PL.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

280

Data:Ff96b170-68b8-4c17-91fb-374a14958bb7 | Open Energy Information  

Open Energy Info (EERE)

b170-68b8-4c17-91fb-374a14958bb7 b170-68b8-4c17-91fb-374a14958bb7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: 2012/05/20 End date if known: Rate name: GS High Density Three Phase LT Sector: Industrial Description: Available for service to locations in a High Density area. A High Density area is defined as:  An enlargement (generally 160 acres) with 20 or more active locations, or  A cluster of 20 or more active locations, or  A cluster with 10 or more active locations that adjoins an enlargement with 20 or more active locations, or  An area adjacent to an incorporated town with 20 or more active locations. Additional Meters (Off-Peak Included) $ 3.60/Meter/Month Renewable Energy Market Adjustment $0.003/KWH (Added to All Above Energy Rates) Controlled Water Heater Credit $.00736/KWH Applies to the first 1,000 KWHs each month (October-March)

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Data:1b171703-7b28-4c7b-8bdc-90b5d8f0d08e | Open Energy Information  

Open Energy Info (EERE)

3-7b28-4c7b-8bdc-90b5d8f0d08e 3-7b28-4c7b-8bdc-90b5d8f0d08e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kootenai Electric Cooperative Effective date: 2012/04/01 End date if known: Rate name: General Service Sector: Commercial Description: Prices reflect the Wholesale Power Cost Adjustment of $0.00414/kWh. Source or reference: http://www.kec.com/documents/rate_schedule_800_general_service_april_12.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

282

Data:82836af6-2452-4c85-8f9a-b54ee0e18325 | Open Energy Information  

Open Energy Info (EERE)

af6-2452-4c85-8f9a-b54ee0e18325 af6-2452-4c85-8f9a-b54ee0e18325 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Maryland Elec Coop Inc Effective date: 2011/01/05 End date if known: Rate name: General Service Demand Industrial Sector: Industrial Description: Available to commercial and industrial Customers and all schools, churches and community halls throughout the area served by the Cooperative for all uses where the peak demand exceeds 25 kW, subject to the established rules and regulations of the Cooperative Customers receiving Standard Offer Service as defined in the General Terms and Conditions will pay A) the Standard Offer Service Charge, B) the Distribution Charge, and C) the Facilities Charge. These Customers will also pay the monthly purchased power cost adjustment.

283

Data:F429800d-92b4-4c48-bfe8-ceb33c296c45 | Open Energy Information  

Open Energy Info (EERE)

d-92b4-4c48-bfe8-ceb33c296c45 d-92b4-4c48-bfe8-ceb33c296c45 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bangor, Wisconsin (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Cp-2 Large Power Service Primary Metering Discount Sector: Industrial Description: Application: This rate will be applied to customers for all types of service, if their monthly Maximum Measured Demand is in excess of 200 kilowatts (kW) per month for three or more months in a consecutive 12-month period. Customers billed on this rate shall continue to be billed on this rate until their monthly Maximum Measured Demand is less than 200 kW per month for 12 consecutive months. The utility shall offer customers billed on this rate a one-time option to continue to be billed on this rate for another 12 months if their monthly Maximum Measured Demand is less than 200 kW per month. However, this option shall be offered with the provision that the customer waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

284

Data:00ff56f6-c865-4450-8c4c-b585e7cd1c70 | Open Energy Information  

Open Energy Info (EERE)

6f6-c865-4450-8c4c-b585e7cd1c70 6f6-c865-4450-8c4c-b585e7cd1c70 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bloomer Electric & Water Co Effective date: 1999/09/15 End date if known: Rate name: Ms-1 Siren and Lighting Service: Yard Lighting 250 W HPS Sector: Lighting Description: This schedule will be applied to municipal street lighting, siren units, field lighting, and yard lighting Fixed Monthly Charge includes Commitment to Community Rider: $1.33 per customer per month. Power Cost Adjustment varies monthly. Wooden Pole Charge: $1.50 per pole per month Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=580

285

Data:4cef4c8c-61a0-4b70-9022-c4e56362a6c3 | Open Energy Information  

Open Energy Info (EERE)

cef4c8c-61a0-4b70-9022-c4e56362a6c3 cef4c8c-61a0-4b70-9022-c4e56362a6c3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwest Rural Elec Assn Inc Effective date: 2010/11/01 End date if known: Rate name: Large Power, Commercial Primary Service Sector: Commercial Description: * Available to Commercial or industrial service over 25kw. Minimum:Higher of 25kw or 90% of previous June-September demand. Delivery of power at primary voltage will be billed with 3% discount given on demand and energy charges. All bills are adjusted by applicable taxes. Summer rates cover May- October and Winter cover November- April.

286

Data:1a066b1a-1cd3-4c7a-b515-2384ff781663 | Open Energy Information  

Open Energy Info (EERE)

6b1a-1cd3-4c7a-b515-2384ff781663 6b1a-1cd3-4c7a-b515-2384ff781663 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stillwater Utilities Authority Effective date: 2012/01/01 End date if known: Rate name: ELECTRIC RATE LARGE POWER AND LIGHT RATE SECONDARY Sector: Industrial Description: This rate is applicable to Service Level 5 Service Level 5 shall mean service at any nominal standard voltage of SEU less than 2,000 volts with metering at less than 2,000 volts. Production Cost Adjustment (PCA): a factor determined by SEU and applied to the cost of energy used by the consumer to account for variations in the cost of generating or purchasing power will apply to this rate.

287

Data:10add6f3-94ef-463e-8151-e36f7f6ee4c0 | Open Energy Information  

Open Energy Info (EERE)

f3-94ef-463e-8151-e36f7f6ee4c0 f3-94ef-463e-8151-e36f7f6ee4c0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Miami-Cass County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Security Lights 400 watt high pressure sodium Direct/120v(Non-metered) Sector: Lighting Description: The Miami-Cass County Rural Electric Membership Corporation (REMC) shall charge and collect for security lighting service on the following bases of availability, character of service, monthly rate, and tax adjustment. AVAILABILITY: Available to any member of the REMC for continuous year round service for outdoor lighting where 120 volt service exists ahead of the meter loop.

288

Data:A2e9356d-7aff-4368-a4c9-2699e7754362 | Open Energy Information  

Open Energy Info (EERE)

e9356d-7aff-4368-a4c9-2699e7754362 e9356d-7aff-4368-a4c9-2699e7754362 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stillwater Utilities Authority Effective date: 2012/01/01 End date if known: Rate name: ELECTRIC RATE POWER AND LIGHT SECONDARY TOD Sector: Commercial Description: Demand Charge Period 2= Summer Season Demand Charge + On-Peak Billing Demand= $2.19/kW+ $8.01/kW= $10.20 An Additional Assessment of $14.89 per bill for the Summer Season billing months (May 1st ending September 30th) will be charged under the Time Of Day Meter Charge Production Cost Adjustment (PCA): A factor determined by SEU and applied to the cost of energy used by the consumer to account for variations in the cost of generating or purchasing power will be applied.

289

Data:4c30d6a2-2532-4926-8f48-c418510b06cd | Open Energy Information  

Open Energy Info (EERE)

4c30d6a2-2532-4926-8f48-c418510b06cd 4c30d6a2-2532-4926-8f48-c418510b06cd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2013/11/01 End date if known: Rate name: GS-2 (Small General Service ESS) Sector: Industrial Description: APPLICABLE TO THE USE OF SERVICE FOR: General Services - with Demand Billing. (For estimated metered demands of more than 5 kilowatts but less than 500 kilowatts.) Flat rate Adjustments = Transition Charge. Reactive Charge: 0.00078/kWh Source or reference: http://www.nyseg.com/MediaLibrary/2/5/Content%20Management/NYSEG/SuppliersPartners/PDFs%20and%20Docs/PSC120ServiceClassification_2.pdf

290

Data:Ff017aa6-e7c3-4c15-8fbf-e58b62222ef3 | Open Energy Information  

Open Energy Info (EERE)

Ff017aa6-e7c3-4c15-8fbf-e58b62222ef3 Ff017aa6-e7c3-4c15-8fbf-e58b62222ef3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: 2012/05/20 End date if known: Rate name: GS Rural Residential-Single Phase LT Sector: Residential Description: Additional Meters (Off-Peak Included) $ 3.60/Meter/Month Renewable Energy Market Adjustment $0.003/KWH (Added to All Above Energy Rates) Controlled Water Heater Credit $.00736/KWH Applies to the first 1,000 KWHs each month (October-March) Annual credit for a load leveler installation after 200 KWH/KW/12 Mo. $0.024/KWH (The homeowner determines his maximum KW demand level that the machine will allow during peak period.) (Closed)

291

Data:98fc5e17-a1e1-4c5d-adcc-9dfc5d056a3d | Open Energy Information  

Open Energy Info (EERE)

fc5e17-a1e1-4c5d-adcc-9dfc5d056a3d fc5e17-a1e1-4c5d-adcc-9dfc5d056a3d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mid-Kansas Electric Company, LLC (MKEC) Effective date: 2010/01/14 End date if known: Rate name: Interruptible Industrial Service-Primary Service Discount Sector: Industrial Description: In all rate areas, with the cooperative reserving the right to remove this rate schedule or modify it in any manner. The rate provision of the net monthly bill excluding the energy cost adjustment clause will be discounted 2% if all service is delivered and metered at a primary distribution voltage of 4160 volts or higher and customer owns and maintains all necessary transformation equipment and substation

292

Data:1b10a960-14e0-4c1d-9c2e-74500bc82f14 | Open Energy Information  

Open Energy Info (EERE)

a960-14e0-4c1d-9c2e-74500bc82f14 a960-14e0-4c1d-9c2e-74500bc82f14 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Two Rivers Water & Light Effective date: 2011/01/01 End date if known: Rate name: Street Lighting- 200W HPS- Ornamental- Aluminum Pole Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting units. The lighting pole charge applies if the lamp is on a dedicated pole that is not used to support the utility distribution system. Pole Charge: $3.00 per pole, per month. The Power Cost Adjustment Clause applies to this rate.

293

Data:Ca419ec1-3507-4c5e-bca1-408d35e587f7 | Open Energy Information  

Open Energy Info (EERE)

ec1-3507-4c5e-bca1-408d35e587f7 ec1-3507-4c5e-bca1-408d35e587f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Trico Electric Cooperative Inc Effective date: 2009/08/01 End date if known: Rate name: Lighting Service 150 Watt HPS Sector: Lighting Description: *It is cooperative owned, operated and maintained. Subject to tax and wholesale power cost adjustment. Source or reference: http://www.trico.coop/images/TRICO_OL1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

294

Data:3384e1fc-7d78-4c94-9bd0-7f20df100307 | Open Energy Information  

Open Energy Info (EERE)

fc-7d78-4c94-9bd0-7f20df100307 fc-7d78-4c94-9bd0-7f20df100307 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wisconsin Rapids W W & L Comm Effective date: 2009/01/01 End date if known: Rate name: Residential TOU Three Phase (9am-9pm) Sector: Residential Description: This rate schedule is optional to all Rg-1, Residential Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

295

Data:9589a040-2996-4c66-87e9-3f9c3ebbd6aa | Open Energy Information  

Open Energy Info (EERE)

40-2996-4c66-87e9-3f9c3ebbd6aa 40-2996-4c66-87e9-3f9c3ebbd6aa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wisconsin Rapids W W & L Comm Effective date: 2009/01/01 End date if known: Rate name: Security Lighting Metal Halide 250 W Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting. The Purchase Cost Adjustment Clause, a charge per all kWh that varies monthly, applies to this rate. Pole Charge: $2.50 per pole per month when pole is needed for installation of light. Source or reference: http://www.wrwwlc.com/StreetYard.aspx

296

Data:E784e8bb-e382-4c80-8ace-6ad75bd22818 | Open Energy Information  

Open Energy Info (EERE)

e8bb-e382-4c80-8ace-6ad75bd22818 e8bb-e382-4c80-8ace-6ad75bd22818 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bloomer Electric & Water Co Effective date: 1999/09/15 End date if known: Rate name: Ms-1 Siren and Lighting Service: Street Lighting 64 W Inc. Blinkers Sector: Lighting Description: This schedule will be applied to municipal street lighting, siren units, field lighting, and yard lighting Fixed Monthly Charge includes Commitment to Community Rider: $1.33 per customer per month. Power Cost Adjustment varies monthly. Wooden Pole Charge: $1.50 per pole per month Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=580

297

Data:7cc2fded-3af7-45d7-8f04-4c618711ab01 | Open Energy Information  

Open Energy Info (EERE)

fded-3af7-45d7-8f04-4c618711ab01 fded-3af7-45d7-8f04-4c618711ab01 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Flora, Illinois (Utility Company) Effective date: 2007/08/01 End date if known: Rate name: Time of Use Sector: Commercial Description: Demand Charge is the larger of Period 1, Period 2, or Period 3. For no reason shall the demand charge be billed as the sum of the three periods. This rate is subject to power cost adjustments. Source or reference: Rates Binder 1 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

298

Data:2b904167-797d-4c3a-a816-2804a2c2bda1 | Open Energy Information  

Open Energy Info (EERE)

-797d-4c3a-a816-2804a2c2bda1 -797d-4c3a-a816-2804a2c2bda1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Benton, Wisconsin (Utility Company) Effective date: 2007/08/17 End date if known: Rate name: Ms-1 General Lighting Service: Overhead 175 W MV Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting units. Fixed Monthly Charge includes Commitment to Community Rider: $1.33 per customer per month. Power Cost Adjustment Clause: Charge per all kWh varies monthly Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=460

299

Refinery Capacity Report  

U.S. Energy Information Administration (EIA) Indexed Site

Refinery Capacity Report Refinery Capacity Report June 2013 With Data as of January 1, 2013 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies. Table 1. Number and Capacity of Operable Petroleum Refineries by PAD District and State as of January 1, 2013

300

Dual capacity reciprocating compressor  

DOE Patents (OSTI)

A multi-cylinder compressor particularly useful in connection with northern climate heat pumps and in which different capacities are available in accordance with reversing motor rotation is provided with an eccentric cam on a crank pin under a fraction of the connecting rods, and arranged for rotation upon the crank pin between opposite positions 180[degree] apart so that with cam rotation on the crank pin such that the crank throw is at its normal maximum value all pistons pump at full capacity, and with rotation of the crank shaft in the opposite direction the cam moves to a circumferential position on the crank pin such that the overall crank throw is zero. Pistons whose connecting rods ride on a crank pin without a cam pump their normal rate with either crank rotational direction. Thus a small clearance volume is provided for any piston that moves when in either capacity mode of operation. 6 figs.

Wolfe, R.W.

1984-10-30T23:59:59.000Z

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Dual capacity reciprocating compressor  

DOE Patents (OSTI)

A multi-cylinder compressor 10 particularly useful in connection with northern climate heat pumps and in which different capacities are available in accordance with reversing motor 16 rotation is provided with an eccentric cam 38 on a crank pin 34 under a fraction of the connecting rods, and arranged for rotation upon the crank pin between opposite positions 180.degree. apart so that with cam rotation on the crank pin such that the crank throw is at its normal maximum value all pistons pump at full capacity, and with rotation of the crank shaft in the opposite direction the cam moves to a circumferential position on the crank pin such that the overall crank throw is zero. Pistons 24 whose connecting rods 30 ride on a crank pin 36 without a cam pump their normal rate with either crank rotational direction. Thus a small clearance volume is provided for any piston that moves when in either capacity mode of operation.

Wolfe, Robert W. (Wilkinsburg, PA)

1984-01-01T23:59:59.000Z

302

Refinery Capacity Report  

U.S. Energy Information Administration (EIA) Indexed Site

Refinery Capacity Report Refinery Capacity Report With Data as of January 1, 2013 | Release Date: June 21, 2013 | Next Release Date: June 20, 2014 Previous Issues Year: 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1997 1995 1994 Go Data series include fuel, electricity, and steam purchased for consumption at the refinery; refinery receipts of crude oil by method of transportation; and current and projected atmospheric crude oil distillation, downstream charge, and production capacities. Respondents are operators of all operating and idle petroleum refineries (including new refineries under construction) and refineries shut down during the previous year, located in the 50 States, the District of Columbia, Puerto Rico, the Virgin Islands, Guam, and other U.S. possessions.

303

Doping Supervalent Rare Earth Ion in LiFePO4/C through ...  

Science Conference Proceedings (OSTI)

... performance is evaluated via galvanostatic charge-discharge, EIS and CV. ... A18: Heat Capacity and Thermal Expansion Measurements of Solar Salts ... Advanced Nanomaterials Structures for Enhanced Solar Energy Conversion.

304

Quantum Zero-error Capacity  

E-Print Network (OSTI)

We define here a new kind of quantum channel capacity by extending the concept of zero-error capacity for a noisy quantum channel. The necessary requirement for which a quantum channel has zero-error capacity greater than zero is given. Finally, we point out some directions on how to calculate the zero-error capacity of such channels.

Rex A. C. Medeiros; Francisco M. De Assis

2006-11-08T23:59:59.000Z

305

Data:5142785a-242f-4c97-8075-e57308924595 | Open Energy Information  

Open Energy Info (EERE)

a-242f-4c97-8075-e57308924595 a-242f-4c97-8075-e57308924595 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Emerald People's Utility Dist Effective date: 2012/04/01 End date if known: Rate name: GENERAL SERVICE Under 50 kW Poly Phase Service 2 Sector: Commercial Description: To nonresidential customers whose entire electric service requirements are supplied and whose loads have never registered 1,000 kW or more, more than once in any consecutive 36-month period. Deliveries at more than one point, or more than one voltage and phase classification, will be separately metered and billed. Service for intermittent, partial requirements, or highly fluctuating loads, or where service is seasonally disconnected during any one-year period, will be provided only by special contract for such service.

306

Data:37cb0e9c-9bea-4c15-a61f-a75290ac3f46 | Open Energy Information  

Open Energy Info (EERE)

e9c-9bea-4c15-a61f-a75290ac3f46 e9c-9bea-4c15-a61f-a75290ac3f46 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indiana Michigan Power Co (Indiana) Effective date: 2012/04/30 End date if known: Rate name: Cogeneration and/or Small Power Production - TOD Sector: Industrial Description: Availability of Service. This schedule is available to customers with cogeneration and/or small power production (COGEN/SPP) facilities which qualify under Section 210 of the Public Utilities Regulatory Policies Act of 1978 and have a total design capacity of 100 kW or less. Such facilities shall be designed to operate properly in parallel with the Company's system without adversely affecting the operation of equipment and services of the Company and its customers and without presenting safety hazards to the Company and customer personnel.

307

Data:13a469f4-d70f-4c8f-9fa3-c6f1c98a45ad | Open Energy Information  

Open Energy Info (EERE)

a469f4-d70f-4c8f-9fa3-c6f1c98a45ad a469f4-d70f-4c8f-9fa3-c6f1c98a45ad No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Rivers Energy Effective date: 2009/06/01 End date if known: Rate name: Farm and Home Sector: Residential Description: To farm and home Consumers for all farm and home uses, and to schools, churches, and community halls. The capacity of individual motors served under this Schedule shall not exceed seven and one-half horsepower without the consent of the Cooperative. Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

308

Data:3fdb68c2-4238-40c6-9138-dc4c86f670a5 | Open Energy Information  

Open Energy Info (EERE)

fdb68c2-4238-40c6-9138-dc4c86f670a5 fdb68c2-4238-40c6-9138-dc4c86f670a5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jackson County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Purchase Offer "R" Sector: Residential Description: Available to any customer on a first-come, first-served basis with on-site distributed generation capacity of 15 kW or less that is powered by renewable resources (e.g. solar, wind, or low-head hydro) and interconnected with Jackson County REMC (REMC) per specifications. Total participation under this tariff is limited to one-tenth of one percent (0.1%) of REMC's peak load during the preceding twelve-month period.

309

Data:9c61013f-0a4c-4d1b-94a5-d4252d866996 | Open Energy Information  

Open Energy Info (EERE)

f-0a4c-4d1b-94a5-d4252d866996 f-0a4c-4d1b-94a5-d4252d866996 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2002/12/03 End date if known: Rate name: Customer-Owned Generation Systems(Greater than 20kW) Sector: Description: Available for single phase and three phase customers where a part or all of the electrical requirement of the customer are supplied by the customer's generating facilities, where such facilities have a total generating capacity of greater than 20kW and less than or equal to 100kW, where such facilities are connected in parallel with the utility. Customers not desiring to sell energy under this rate have the right to negotiate a buy-back rate. Customers with generating facilities greater than 100 kW can negotiate a buy-back rate. Should the utility be unwilling to pay the minimum rate for electrical energy, the utility shall agree to transport such electrical energy to another utility that will pay such minimum rate.

310

Data:8b9a95e2-424c-4c6e-81af-7d151eba9999 | Open Energy Information  

Open Energy Info (EERE)

e2-424c-4c6e-81af-7d151eba9999 e2-424c-4c6e-81af-7d151eba9999 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Johnson County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Single Phase Commercial Service Sector: Residential Description: Availability Available in all territory served by the Corporation, in accordance with the Corporation Service Rules and Regulations. Members having their principal place of business on the same premises as their home may include service for both on the same meter, in which case all service will be billed under the schedule using the rate set out below. If the member prefers, provisions may be made for two meters, in which case usage for residential purposes will be billed under the appropriate residential schedule, and usage for business purposes will be billed under this Schedule SPC. Applicability Applicable to commercial consumers up to and including 100 kVA. In general, motors having a rated capacity in excess of ten horsepower (10 h.p.) should be a three-phase service. The Corporation's Engineering department must approve any variances.

311

Data:1e477395-0ccb-4c96-88fd-26b4864a265f | Open Energy Information  

Open Energy Info (EERE)

-0ccb-4c96-88fd-26b4864a265f -0ccb-4c96-88fd-26b4864a265f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Jackson Center, Ohio (Utility Company) Effective date: 2001/04/30 End date if known: Rate name: Large Power Service- Secondary Metering Sector: Industrial Description: This schedule is available to all Customers located along electric distribution lines of Utility who use Utility's standard primary or secondary service and who guarantee the monthly billing capacity specified by service application of contract, but not less than 50 kW. The kW billing demand shall be the highest measured 15-minute integrated or equivalent thermal kW demand, determined to the nearest kW.

312

Data:Fce0e4c5-b1fe-4397-94b8-d9d95d17c39f | Open Energy Information  

Open Energy Info (EERE)

Fce0e4c5-b1fe-4397-94b8-d9d95d17c39f Fce0e4c5-b1fe-4397-94b8-d9d95d17c39f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Indiana Inc Effective date: 2009/09/14 End date if known: Rate name: High Load Factor - Primary Direct Sector: Industrial Description: Availability Available to any customer contracting for a specified capacity of not less than 25 kW. Applicant must be located adjacent to an electric transmission or distribution line of Company that is adequate and suitable for supplying the service requested. Character of Service Alternating current having a frequency of sixty Hertz and furnished in accordance with the provisions set forth hereunder.

313

Data:24632e9c-526f-4b56-aa17-3fdc4c7d46de | Open Energy Information  

Open Energy Info (EERE)

e9c-526f-4b56-aa17-3fdc4c7d46de e9c-526f-4b56-aa17-3fdc4c7d46de No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Electric Member Corp Effective date: 2010/11/01 End date if known: Rate name: SCHEDULE I-8 - greater than 30 kVA (Three Phase - Interruptible Energy Charge) Sector: Commercial Description: Applicable for electric service supplied to irrigation loads. The capacity of individual motors served under this schedule shall not exceed ten (10) horsepower without consent from the Cooperative. Source or reference: ISU Documentation Source Parent: Comments When electric service to the consumer's irrigation load is subject to interruption by the Cooperative's load management equipment during Load Control Periods, the Interruptible Energy Charge shall apply:

314

Data:Cd4372b7-e847-4c82-abee-7dc7a3168f43 | Open Energy Information  

Open Energy Info (EERE)

72b7-e847-4c82-abee-7dc7a3168f43 72b7-e847-4c82-abee-7dc7a3168f43 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Domestic-All Electric Load Control-Rate 4,Single Phase Sector: Residential Description: 1. Available to homes,schools,churches and community halls for all uses including mobile homes,who also agree to allow control of air-conditioning systems and water heaters by means of automated load Control Relays and subject to the established rules and regulations of the cooperative. 2. The capacity of individual motors served under this schedule shall not exceed 10 horsepower.

315

Data:8611c349-4c02-46e7-ae2b-6010794a9c3b | Open Energy Information  

Open Energy Info (EERE)

c349-4c02-46e7-ae2b-6010794a9c3b c349-4c02-46e7-ae2b-6010794a9c3b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/07/01 End date if known: Rate name: Industrial (demand charge)- within corporate limits Sector: Industrial Description: tiered demand charge Standby power installation per kilovolt-ampere per month of installed capacity. This charge shall replace any minimum charge in a designated rate schedule Within Corporate Limits is 0.30 ,outside corporate limits is 0.035 Source or reference: http://www.amlegal.com/nxt/gateway.dll/Ohio/painesville_oh/codifiedordinancesofthecityofpainesville?f=templates$fn=default.htm$3.0$vid=amlegal:painesville_oh

316

Data:F2849f96-715b-4c42-8a08-0ac7093204b2 | Open Energy Information  

Open Energy Info (EERE)

f96-715b-4c42-8a08-0ac7093204b2 f96-715b-4c42-8a08-0ac7093204b2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hart Electric Member Corp Effective date: 2006/10/01 End date if known: Rate name: Schedule B-10 Small Commercial Service Multi-Phase Sector: Commercial Description: AVAILABILITY SINGLE PHASE: Available in all territory served by the Corporation in accordance with the Corporation's Service Rules and Regulations. MULTI-PHASE: Available to consumers located on or near the Corporation's multi-phase lines of adequate capacity, subject to the Corporation's Service Rules and Regulations. This schedule may be made available in additional territory, at the option of the Corporation, by making a line extension under the conditions outlined in the appropriate paragraph below.

317

Data:9378ebc1-b1a8-4c79-8d97-fbb28142c454 | Open Energy Information  

Open Energy Info (EERE)

ebc1-b1a8-4c79-8d97-fbb28142c454 ebc1-b1a8-4c79-8d97-fbb28142c454 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Decatur County Rural E M C Effective date: 2010/12/01 End date if known: Rate name: SCHEDULE SP-TOU Sector: Commercial Description: Available as an optional rate to any member of the Corporation for farm, residential, church, school and public building uses, located on its lines for all types of single-phase electric service including power for motors not to exceed ten horsepower (10 H.P.) of individual capacity or a total motor load not in excess of one hundred horsepower (100 H.P.) in use at any time. A member choosing this optional rate must remain on the rate for a minimum of six months. Members opting to change to a different rate schedule after the six month minimum period must wait a minimum of six months before returning to this optional rate.

318

Data:43a7cf4c-3fc7-4984-9091-f14d5cc094dd | Open Energy Information  

Open Energy Info (EERE)

cf4c-3fc7-4984-9091-f14d5cc094dd cf4c-3fc7-4984-9091-f14d5cc094dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconto Falls Water & Light Comm Effective date: 2002/05/16 End date if known: Rate name: Pgs-2 Customer-Owned Generation Systems (Greater than 20kW) Sector: Description: Available for single-phase and three-phase where part or all of the electrical requirements of the customer are supplied by the customer's generating facilities, where such requirements of the customer are supplied by the customer's generating facilities have a total generating capacity of greater than 20kW and less than or equal to 100kW, where such facilities are connected in parallel with the utility. Customers not desiring to sell energy under this rate have the right to negotiate a buy-back rate.

319

Data:A24903cb-4c9f-4fcd-ade2-d674b37aa229 | Open Energy Information  

Open Energy Info (EERE)

903cb-4c9f-4fcd-ade2-d674b37aa229 903cb-4c9f-4fcd-ade2-d674b37aa229 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Carroll Electric Member Corp Effective date: 2012/01/01 End date if known: Rate name: Irrigation Off-Peak Seasonal Service Sector: Commercial Description: Applicable to loads not exceeding 300 kW connected load for the following consumer loads: 1) Loads controlled by radio signal, electrical or mechanical methods to prohibit "on-peak" usage, or 2) Loads requiring energy and capacity only during "off-peak" periods. "On-Peak" hours shall be from 2:00 p.m. to 8:00 p.m. for the billing months of June through September, inclusive.

320

Data:E8d36275-7231-4c76-b3a5-d056f47f0d99 | Open Energy Information  

Open Energy Info (EERE)

d36275-7231-4c76-b3a5-d056f47f0d99 d36275-7231-4c76-b3a5-d056f47f0d99 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mitchell Electric Member Corp Effective date: 2009/01/01 End date if known: Rate name: SCHEDULE I-OPS-14 IRRIGATION OFF-PEAK SEASONAL SERVICE Multi-Phase Sector: Commercial Description: AVAILABILITY Available to consumers for single-phase service in all territory served by the Cooperative. Multi-phase service is available only to consumers located on or near the Cooperative's multi-phase lines of adequate capacity. All service is made available in accordance with the Cooperative's Service Rules and Regulations. Service under this schedule shall be available through December 31, 2010, at which time this schedule shall expire.

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Data:583756e1-ad7a-4b58-9ad7-04ea4c7f01e9 | Open Energy Information  

Open Energy Info (EERE)

6e1-ad7a-4b58-9ad7-04ea4c7f01e9 6e1-ad7a-4b58-9ad7-04ea4c7f01e9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Swisher Electric Coop, Inc Effective date: 2012/01/01 End date if known: Rate name: Commercial Service Single Phase Sector: Commercial Description: Available to commercial establishments and uses up to 50 kVA of transformer capacity. Limited to individual motors up to 10 h.p. for single phase service, excludes service to irrigation pumps. Minimum Charge per month: $17.84 +$1.50/ KVA over 150 KVA transformer Source or reference: Rate Binder 5, Illinois State University Source Parent:

322

Data:Dedecaa4-c232-4404-b9b9-9826cbce87c3 | Open Energy Information  

Open Energy Info (EERE)

Dedecaa4-c232-4404-b9b9-9826cbce87c3 Dedecaa4-c232-4404-b9b9-9826cbce87c3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Dakota Valley Elec Coop Inc Effective date: 2013/01/01 End date if known: Rate name: THREE-PHASE INTERRUPTIBLE LARGE COMMERCIAL SERVICE Sector: Commercial Description: This rate is applicable for three-phase loads with peak kW demand between 151-kW and 2000-kW, which are subject to control each month of the year originating from a signal from the Cooperative, and which meet all other Cooperative requirements and policies. Transformer Capacity Charge $1.00 charge for each additional kVA over 30 less demand and energy usage for the month.

323

Data:D8674966-497a-4f4c-bea1-8d992a35c049 | Open Energy Information  

Open Energy Info (EERE)

D8674966-497a-4f4c-bea1-8d992a35c049 D8674966-497a-4f4c-bea1-8d992a35c049 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwestern Public Service Co Effective date: 2011/12/28 End date if known: Rate name: GS (General Service Secondary) Sector: Commercial Description: To all commercial and industrial electric service supplied at secondary voltage and at one point of delivery, and measured through one meter with a demand greater than 10 kW and served where facilities of adequate capacity and suitable voltage are adjacent to the premises to be served. Source or reference: http://www.nmprc.state.nm.us/consumer-relations/company-directory/electric/xcel-energy/rates/rate40.pdf

324

Data:B4dc4b35-09b5-4c04-be51-0908b9a1a851 | Open Energy Information  

Open Energy Info (EERE)

dc4b35-09b5-4c04-be51-0908b9a1a851 dc4b35-09b5-4c04-be51-0908b9a1a851 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Wisconsin Effective date: 2012/01/01 End date if known: Rate name: AUTOMATIC PROTECTIVE LIGHTING SERVICE 70 W SV Sector: Lighting Description: Availability Available to all classes of customers for area lighting service. Energy Cost Adjustment: Bills subject to the adjustment provided for in Energy Cost Adjustment. See Schedule X-1 Sheet No. E 63. Service Included in Rate Company will install, own, operate and provide routine maintenance to the lighting unit including the fixture, lamp, ballast, photo-electric control, mounting brackets and all necessary wiring. Company shall furnish all electric energy required for operation of the unit.

325

Capacity Value of Solar Power  

Science Conference Proceedings (OSTI)

Evaluating the capacity value of renewable energy sources can pose significant challenges due to their variable and uncertain nature. In this paper the capacity value of solar power is investigated. Solar capacity value metrics and their associated calculation methodologies are reviewed and several solar capacity studies are summarized. The differences between wind and solar power are examined, the economic importance of solar capacity value is discussed and other assessments and recommendations are presented.

Duignan, Roisin; Dent, Chris; Mills, Andrew; Samaan, Nader A.; Milligan, Michael; Keane, Andrew; O'Malley, Mark

2012-11-10T23:59:59.000Z

326

Load Capacity of Bodies  

E-Print Network (OSTI)

For the stress analysis in a plastic body $\\Omega$, we prove that there exists a maximal positive number $C$, the \\emph{load capacity ratio,} such that the body will not collapse under any external traction field $t$ bounded by $Y_{0}C$, where $Y_0$ is the elastic limit. The load capacity ratio depends only on the geometry of the body and is given by $$ \\frac{1}{C}=\\sup_{w\\in LD(\\Omega)_D} \\frac{\\int_{\\partial\\Omega}|w|dA} {\\int_{\\Omega}|\\epsilon(w)|dV}=\\left\\|\\gamma_D\\right\\|. $$ Here, $LD(\\Omega)_D$ is the space of isochoric vector fields $w$ for which the corresponding stretchings $\\epsilon(w)$ are assumed to be integrable and $\\gamma_D$ is the trace mapping assigning the boundary value $\\gamma_D(w)$ to any $w\\in LD(\\Omega)_D$.

Reuven Segev

2005-11-01T23:59:59.000Z

327

Refinery Capacity Report  

U.S. Energy Information Administration (EIA) Indexed Site

1 1 Idle Operating Total Stream Day Barrels per Idle Operating Total Calendar Day Barrels per Atmospheric Crude Oil Distillation Capacity Idle Operating Total Operable Refineries Number of State and PAD District a b b 14 10 4 1,617,500 1,205,000 412,500 1,708,500 1,273,500 435,000 ............................................................................................................................................... PAD District I 1 0 1 182,200 0 182,200 190,200 0 190,200 ................................................................................................................................................................................................................................................................................................ Delaware......................................

328

Data:D8bd11b2-4e1b-421a-b4c0-1b6e22a7fbb2 | Open Energy Information  

Open Energy Info (EERE)

b2-4e1b-421a-b4c0-1b6e22a7fbb2 b2-4e1b-421a-b4c0-1b6e22a7fbb2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Choctaw Electric Coop Inc Effective date: 2008/10/21 End date if known: Rate name: Customer Furnished Investment 400 Watt HPS Sector: Lighting Description: * Available under written contract with municipalities or government authorities for the purpose of lighting highways, streets, and other areas Service is available subject to the Cooperative's Terms and conditions on file with the Oklahoma Corporation Commission. Subject to tax adjustment. Source or reference: Rate binder # 4

329

Data:72a25f4b-0c82-4c5c-a72c-c59cef3f5990 | Open Energy Information  

Open Energy Info (EERE)

b-0c82-4c5c-a72c-c59cef3f5990 b-0c82-4c5c-a72c-c59cef3f5990 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Two Rivers Water & Light Effective date: 2011/01/01 End date if known: Rate name: General Service- Three-Phase Sector: Commercial Description: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 100 kilowatts for three or more months in a consecutive 12-month period. The following Riders, Adjustments, and Billing Options are applicable to this rate:

330

Total Natural Gas Underground Storage Capacity  

U.S. Energy Information Administration (EIA) Indexed Site

Capacity Working Gas Capacity of Salt Caverns Working Gas Capacity of Aquifers Working Gas Capacity of Depleted Fields Total Number of Existing Fields Number of Existing Salt...

331

Capacities associated with scalar signed Riesz kernels, and analytic capacity  

E-Print Network (OSTI)

The real and imaginari parts of the Cauchy kernel in the plane are scalar Riesz kernels of homogeneity -1. One can associate with each of them a natural notion of capacity related to bounded potentials. The main result of the paper asserts that these capacities are comparable to classical analytic capacity, thus stressing the real variables nature of analytic capacity. Higher dimensional versions of this result are also considered.

Mateu, Joan; Verdera, Joan

2010-01-01T23:59:59.000Z

332

x???N*A**? ZDK(mP?IH z *?CT"Hh?x*4* *??C*? ...  

Science Conference Proceedings (OSTI)

x???N*A**? ZDK(mP?IH?z?*?CT"Hh?x*4*?*??C*???;G@ PBJ}???????IUu????`o?1\\?*N????x

2011-03-02T23:59:59.000Z

333

Multipath Channels of Unbounded Capacity  

E-Print Network (OSTI)

The capacity of discrete-time, noncoherent, multipath fading channels is considered. It is shown that if the variances of the path gains decay faster than exponentially, then capacity is unbounded in the transmit power.

Koch, Tobias

2008-01-01T23:59:59.000Z

334

Data:4a576d56-82d4-4c73-a1f7-b8a8c971d781 | Open Energy Information  

Open Energy Info (EERE)

6-82d4-4c73-a1f7-b8a8c971d781 6-82d4-4c73-a1f7-b8a8c971d781 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Gulf States Louisiana LLC Effective date: 2011/10/28 End date if known: Rate name: 2 Area Lighting - Flood light MV - 1000W - and 35 foot wood pole Sector: Lighting Description: This rate is applicable under the regular terms and conditions of the company in areas designated by company where facilities of adequate capacity and suitable voltage are available. Source or reference: http://www.entergy-louisiana.com/content/price/tariffs/egsi/egsila_als.pdf Source Parent: Comments

335

Heat capacities of elastic solids  

E-Print Network (OSTI)

The work function is embedded in the equation describing the relationship between the constant volume and constant pressure heat capacities. The modification of the work function results that the relationship between these quantities must be changed accordingly. Using the newly derived work functions of elastic solids the description of the heat capacities and the relationship between the heat capacities are given for solid phase.

Garai, J

2005-01-01T23:59:59.000Z

336

Symmetrical Symplectic Capacity with Applications  

E-Print Network (OSTI)

In this paper, we first introduce the concept of symmetrical symplectic capacity for symmetrical symplectic manifolds, and by using this symmetrical symplectic capacity theory we prove that there exists at least one symmetric closed characteristic (brake orbit and $S$-invariant brake orbit are two examples) on prescribed symmetric energy surface which has a compact neighborhood with finite symmetrical symplectic capacity.

Liu, Chungen

2010-01-01T23:59:59.000Z

337

Magnetically Coupled Adjustable Speed Drive Systems  

DOE Green Energy (OSTI)

Adjustable speed drive (ASD) technologies have the ability to precisely control motor sytems output and produce a numbr of benefits including energy and demand savings. This report examines the performance and cost effectiveness of a specific class of ASDs called magnetically-coupled adjustable speed drives (MC-ASD) which use the strength of a magnetic field to control the amount of torque transferred between motor and drive shaft. The MagnaDrive Adjustable Speed Coupling System uses fixed rare-earth magnets and varies the distance between rotating plates in the assembly. the PAYBACK Variable Speed Drive uses an electromagnet to control the speed of the drive

Chvala, William D.; Winiarski, David W.

2002-08-18T23:59:59.000Z

338

An Assessment of Railway Capacity  

E-Print Network (OSTI)

In this paper, we review the main concepts and methods to perform capacity analyses, and we present an automated tool that is able to perform several capacity analyses. Capacity is extremely dependent on infrastructure, traffic, and operating parameters. Therefore, an in-depth study of the main factors that influence railway capacity is performed on several Spanish railway infrastructures. The results show how the capacity varies according to factors such as train speed, commercial stops, train heterogeneity, distance between railway signals, and timetable robustness.

M. Abril; F. Barber; A L. Ingolotti; A M. A. Salido; P. Tormos; B A. Lova

2007-01-01T23:59:59.000Z

339

Bulk Compton motion in the luminous quasar 4C04.42?  

E-Print Network (OSTI)

We present the broadband analysis of the powerful quasar 4C04.42 (z=0.965) observed by XMM and INTEGRAL. The 0.2--200 keV spectrum is well reproduced with a hard power-law component ($\\Gamma\\sim$1.2), augmented by a soft component below 2 keV (observer frame), which is described by a thermal blackbody with temperature kT$\\backsimeq$ 0.15 keV. Alternatively, a broken power-law with E$_{break}$=2 keV and $\\Delta\\Gamma$=0.4 can equally well describe the data. Using archival data we compile the not-simultaneous Spectral Energy Distribution of the source from radio to gamma-ray frequencies. The SED shows two main components: the low frequency one produced by Synchrotron radiation from the electrons moving in the jet and the high energy one produced through external Compton scattering of the electrons with the photon field of the Broad Line Region. Within this scenario the excess emission in the soft-X ray band can be interpreted as due to Bulk Compton radiation of cold electrons. However, some other processes, briefly discussed in the text, can also reproduce the observed bump.

A. De Rosa; L. Bassani; P. Ubertini; A. Malizia; A. J. Dean

2008-05-13T23:59:59.000Z

340

Bulk Compton motion in the luminous quasar 4C04.42?  

E-Print Network (OSTI)

We present the broadband analysis of the powerful quasar 4C04.42 (z=0.965) observed by XMM and INTEGRAL. The 0.2--200 keV spectrum is well reproduced with a hard power-law component ($\\Gamma\\sim$1.2), augmented by a soft component below 2 keV (observer frame), which is described by a thermal blackbody with temperature kT$\\backsimeq$ 0.15 keV. Alternatively, a broken power-law with E$_{break}$=2 keV and $\\Delta\\Gamma$=0.4 can equally well describe the data. Using archival data we compile the not-simultaneous Spectral Energy Distribution of the source from radio to gamma-ray frequencies. The SED shows two main components: the low frequency one produced by Synchrotron radiation from the electrons moving in the jet and the high energy one produced through external Compton scattering of the electrons with the photon field of the Broad Line Region. Within this scenario the excess emission in the soft-X ray band can be interpreted as due to Bulk Compton radiation of cold electrons. However, some other processes, bri...

De Rosa, A; Ubertini, P; Malizia, A; Dean, A J

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Entangling capacity with local ancilla  

E-Print Network (OSTI)

We investigate the entangling capacity of a dynamical operation with access to local ancilla. A comparison is made between the entangling capacity with and without the assistance of prior entanglement. An analytic solution is found for the log-negativity entangling capacity of two-qubit gates, which equals the entanglement of the Choi matrix isomorphic to the unitary operator. Surprisingly, the availability of prior entanglement does not affect this result; a property we call resource independence of the entangling capacity. We prove several useful upper-bounds on the entangling capacity that hold for general qudit dynamical operations, and for a whole family of entanglement measures including log-negativity and log-robustness. The log-robustness entangling capacity is shown to be resource independent for general dynamics. We provide numerical results supporting a conjecture that the log-negativity entangling capacity is resource independence for all two-qudit unitaries.

Campbell, Earl T

2010-01-01T23:59:59.000Z

342

Measurement of Battery Capacity in Mobile Robot Systems  

E-Print Network (OSTI)

With battery driven robot systems performing very sophisticated tasks, increasing demands on the power supply play a critical role. Operation breakdowns are unpredictable unless the state of the battery is known, and the overall performance should be adjusted according to reliable remaining capacity estimations. This paper addresses many of the issues related to the management and monitoring of battery packs for mobile robots, whereas an implementation for a particular system is presented.

Nestor Lucas; Cosmin Codrea; Thomas Hirth; Javier Gutierrez; Falko Dressler

2005-01-01T23:59:59.000Z

343

ARM - Evaluation Product - Sonde-Adjust  

NLE Websites -- All DOE Office Websites (Extended Search)

ProductsSonde-Adjust ProductsSonde-Adjust Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Evaluation Product : Sonde-Adjust Site(s) FKB GRW HFE NIM NSA PYE SGP TWP General Description The sonde-adjust VAP produces data that corrects documented biases in radiosonde humidity measurements. Unique fields contained within this datastream include smoothed original relative humidity, dry bias corrected relative humidity, and final corrected relative humidity. The smoothed RH field refines the relative humidity from integers - the resolution of the instrument - to fractions of a percent. This profile is then used to calculate the dry bias corrected field. The final correction fixes a time-lag problem and uses the dry-bias field as input into the algorithm.

344

Transilient Turbulence Theory. Part II: Turbulent Adjustment  

Science Conference Proceedings (OSTI)

Turbulent adjustment is a scheme where dynamic instabilities in the flow are eliminated by turbulence. It is a form of first-order turbulence closure that is applicable to numerical forecast models of the atmosphere. The responsive form of ...

Roland B. Stull; Takehiko Hasegawa

1984-12-01T23:59:59.000Z

345

Nonlinear Atmospheric Adjustment to Thermal Forcing  

Science Conference Proceedings (OSTI)

A nonlinear, numerical model of a compressible atmosphere is used to simulate the hydrostatic and geostrophic adjustment to a localized prescribed heating applied over five minutes with a size characteristic of an isolated, deep, cumulus cloud. ...

Paul F. Fanelli; Peter R. Bannon

2005-12-01T23:59:59.000Z

346

Hydrostatic Adjustment in Nonhydrostatic, Compressible Mesoscale Models  

Science Conference Proceedings (OSTI)

The ability of various numerical techniques used in compressible, nonhydrostatic models to handlehydrostatic adjustment is intercompared. The exact solution of a linearized model of an isothermal, compressible, nonrotating atmosphere is compared ...

Dean G. Duffy

1997-12-01T23:59:59.000Z

347

Geostrophic Adjustment: Frontogenesis and Energy Conversion  

Science Conference Proceedings (OSTI)

Nonlinear geostrophic adjustment is examined with a Boussinesq model. The motion is restricted to a two-dimensional channel in the horizontal and vertical (x, z) plane; the fluid is in uniform rotation, is stably stratified, inviscid, and ...

William Blumen; Rongsheng Wu

1995-03-01T23:59:59.000Z

348

Time-Dependent Fully Nonlinear Geostrophic Adjustment  

Science Conference Proceedings (OSTI)

Shock-capturing numerical methods are employed to integrate the fully nonlinear, rotating 1D shallow-water equations starting from steplike nongeostrophic initial conditions (a Rossby adjustment problem). Such numerical methods allow one to ...

Allen C. Kuo; Lorenzo M. Polvani

1997-08-01T23:59:59.000Z

349

Microeconomic Inventory Adjustment and Aggregate Dynamics  

E-Print Network (OSTI)

We examine microeconomic and aggregate inventory dynamics in the business sector of the U.S. economy. We employ high-frequency ...rm-level data and use an empirically tractable model, in which the aggregate dynamics are derived explicitly from the underlying microeconomic data. Our results show that the microeconomic adjustment function in both the manufacturing and trade sectors is nonlinear and asymmetric, results consistent with ...rms using (S; s)-type inventory policies. There are dierences in the estimated adjustment functions between the two sectors as well as the durable and nondurable goods ...rms within each sector. The estimated adjustment function is remarkably stable across subperiods, indicating little change in the inventory adjustment process over time. As predicted by our model, higher moments of the cross-sectional distribution of inventory deviations aect aggregate inventory dynamics. Both authors are aliated with the Research Department, Federal Reserve...

Jonathan Mccarthy; Egon Zakrajsek; We Thank Palle Andersen; Andy Caplin; Mark Gertler; John Haltiwanger; Jim Harrigan; Brad Humphreys; Spence Krane; Trish Mosser; Simon Potter; Tom Sargent

1998-01-01T23:59:59.000Z

350

Data:A9178ef0-ea61-4c4f-b105-50e36f676813 | Open Energy Information  

Open Energy Info (EERE)

78ef0-ea61-4c4f-b105-50e36f676813 78ef0-ea61-4c4f-b105-50e36f676813 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Firelands Electric Coop, Inc Effective date: 2011/02/23 End date if known: Rate name: LARGE THREE PHASE GENERAL SERVICE (>50 kW) Sector: Commercial Description: This schedule is available throughout the Cooperative's entire service area subject to the availability limitation and other stipulations that follow, or by contract at the Cooperative's option. This schedule is applicable to single phase consumers requiring greater than 100 kVA of installed transformer capacity and to all three phase consumers. Other service options are available under a special contract schedule. In the event that an extension, expansion, or enlargement of the Cooperative's system facilities is required, the Cooperative, in order to justify the investment and operational costs involved, at its option may require a contribution in aid of construction or a larger monthly service charge depending upon the conditions involved. CHARACTER AND TYPE OF SERVICE: Service rendered under this schedule shall be single phase, 60 hertz, at available secondary 120/240 nominal voltage; or three phase, 60 Hertz, at 120/208 volts or 277/480 volts; or 240 volts or 480 volts or other voltages as may be mutually agreeable.

351

Data:A5e4a233-9ef0-4c35-a849-1ed1d934fa0d | Open Energy Information  

Open Energy Info (EERE)

-9ef0-4c35-a849-1ed1d934fa0d -9ef0-4c35-a849-1ed1d934fa0d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Escanaba, Michigan (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Suburban Commercial Energy Rate Three Phase Sector: Commercial Description: To commercial customers for all purposes except those otherwise specially rated. For as long as the City has costs associated with the ownership of the power plant, these costs shall be recovered through the following power plant cost adjustment factor:$0.01000 for all kWh, all service classes. State of Michigan P.A. 295, of Public Acts 2008, commonly referred to as the Clean, Renewable and Efficient Energy Act mandates the electric utility collect the following charges from each electric utility customer: Commercial $0.00200/kWh. The sum of these charges is reflected in adjustments to the energy charge.

352

Data:014d14d7-3be2-4c7e-accd-d14e9b12f8e0 | Open Energy Information  

Open Energy Info (EERE)

4d7-3be2-4c7e-accd-d14e9b12f8e0 4d7-3be2-4c7e-accd-d14e9b12f8e0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Mazomanie, Wisconsin (Utility Company) Effective date: 2006/06/15 End date if known: Rate name: Rg-1 Residential Service Three Phase Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0574 per kilowatt-hour.

353

Data:16cf2ac9-9a46-4bd6-a43f-cb4c6db43f12 | Open Energy Information  

Open Energy Info (EERE)

ac9-9a46-4bd6-a43f-cb4c6db43f12 ac9-9a46-4bd6-a43f-cb4c6db43f12 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Four or More Lights 175-Watt MVL Sector: Lighting Description: - Available to all consumers located on or adjacent to cooperative's single-phase or three-phase lines. - Subject to power cost adjustment,tax adjustment and rate revisions. - Monthly rate depend on light within 150ft. proximity. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

354

Data:Dc21e9b7-f6f5-4c74-9f8d-d480ba4227be | Open Energy Information  

Open Energy Info (EERE)

1e9b7-f6f5-4c74-9f8d-d480ba4227be 1e9b7-f6f5-4c74-9f8d-d480ba4227be No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Medford, Wisconsin (Utility Company) Effective date: 1997/06/27 End date if known: Rate name: Cp-1 Small Power Service between 40kW and 200kW Demand Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: This rate will be applied to customers for all types of service if their monthly maximum demand is in excess of 40kW for three or more months in a consecutive 12-month period. Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0351 per kilowatt-hour.

355

Data:B821b33d-41e5-4c2c-b4dd-bc9b7cd76033 | Open Energy Information  

Open Energy Info (EERE)

b33d-41e5-4c2c-b4dd-bc9b7cd76033 b33d-41e5-4c2c-b4dd-bc9b7cd76033 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Manitowoc Public Utilities Effective date: 2009/06/01 End date if known: Rate name: Cp-3 Large Power Time-of-Day Service(>6000 volts)Primary and Transformer Ownership Discount (20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0361 per kilowatt-hour.

356

Data:6d1c795f-6e37-464f-b983-4a72f5c4c727 | Open Energy Information  

Open Energy Info (EERE)

c795f-6e37-464f-b983-4a72f5c4c727 c795f-6e37-464f-b983-4a72f5c4c727 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Plymouth, Wisconsin (Utility Company) Effective date: 2011/12/22 End date if known: Rate name: Gs-2 Rural General Service Single Phase Optional Time-of-Day 7am-7pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0774 per kilowatt-hour.

357

Data:Fa0d162a-6f75-4f07-92c5-5bcd4c314b81 | Open Energy Information  

Open Energy Info (EERE)

d162a-6f75-4f07-92c5-5bcd4c314b81 d162a-6f75-4f07-92c5-5bcd4c314b81 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-1 Residential Service Single Phase with Parallel Generation(20kW or less)-Net Energy Billing Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

358

Data:B72fad4c-11c5-4a4d-85c0-5b9b3796f660 | Open Energy Information  

Open Energy Info (EERE)

fad4c-11c5-4a4d-85c0-5b9b3796f660 fad4c-11c5-4a4d-85c0-5b9b3796f660 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Muscoda, Wisconsin (Utility Company) Effective date: 2010/10/26 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0844 per kilowatt-hour.

359

Data:Cc5a450d-739f-4ba5-9d2a-e08dfc4c22b9 | Open Energy Information  

Open Energy Info (EERE)

a450d-739f-4ba5-9d2a-e08dfc4c22b9 a450d-739f-4ba5-9d2a-e08dfc4c22b9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Primary Metering and Transformer Ownership Discount (above 15,000 volts) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

360

Data:66d59b9d-7b2c-4a84-bfdf-a2e1a3c4c628 | Open Energy Information  

Open Energy Info (EERE)

7b2c-4a84-bfdf-a2e1a3c4c628 7b2c-4a84-bfdf-a2e1a3c4c628 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2010/02/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Data:57d7c0a5-4c44-40a1-9c6a-22d5eca85df5 | Open Energy Information  

Open Energy Info (EERE)

c0a5-4c44-40a1-9c6a-22d5eca85df5 c0a5-4c44-40a1-9c6a-22d5eca85df5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Sauk City, Wisconsin (Utility Company) Effective date: 2008/08/18 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day Single Phase with Parallel Generation(20kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0756 per kilowatt-hour.

362

Data:Fb6b6dbc-e7c2-4d4c-8c18-e0cf9d99c8ca | Open Energy Information  

Open Energy Info (EERE)

b6dbc-e7c2-4d4c-8c18-e0cf9d99c8ca b6dbc-e7c2-4d4c-8c18-e0cf9d99c8ca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Princeton, Wisconsin (Utility Company) Effective date: 2006/09/14 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 8am-8pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0524 per kilowatt-hour.

363

Data:9a0c0e75-375b-4c39-8d7d-ea9e6e4bf9b8 | Open Energy Information  

Open Energy Info (EERE)

5-375b-4c39-8d7d-ea9e6e4bf9b8 5-375b-4c39-8d7d-ea9e6e4bf9b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 9am-9pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

364

Data:D12e81a4-0c87-4c86-a8a8-49b5d633be10 | Open Energy Information  

Open Energy Info (EERE)

e81a4-0c87-4c86-a8a8-49b5d633be10 e81a4-0c87-4c86-a8a8-49b5d633be10 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of River Falls, Wisconsin (Utility Company) Effective date: 2008/04/11 End date if known: Rate name: Ms-2 Area Lighting Service 150 Watt High Pressure Sodium Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0662 per kilowatt-hour.

365

Data:B9f58f3a-74d9-4c30-83b9-5d67a006093e | Open Energy Information  

Open Energy Info (EERE)

8f3a-74d9-4c30-83b9-5d67a006093e 8f3a-74d9-4c30-83b9-5d67a006093e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Gin Service- Rate 14,Three Phase Sector: Industrial Description: - Available to cotton gin and peanut drying consumers located on or near the cooperative's three-phase lines. - Subject to Power cost adjustment, Tax adjustment and Rate revisions. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

366

Decentralized capacity management and internal pricing  

E-Print Network (OSTI)

Press. Goex, R. (2002). Capacity planning and pricing undermanufacturing on innovation, capacity and pro?tability.Mieghem, V. J. (2003). Capacity management, investment and

Dutta, Sunil; Reichelstein, Stefan

2010-01-01T23:59:59.000Z

367

Capacity consideration of wireless ad hoc networks  

E-Print Network (OSTI)

Capacity ProblemCurrent Research on Capacity of Wireless Ad HocChapter 3 Upper Bound on the Capacity of Wireless Ad Hoc

Tan, Yusong

2008-01-01T23:59:59.000Z

368

Are there capacity limitations in symmetry perception?  

E-Print Network (OSTI)

1980). The demonstration of capacity limitation. Cognitive1972). Visual processing capacity and attentional control.J. (1996). Goodness of CAPACITY LIMIT OF SYMMETRY PERCEPTION

Huang, L Q; Pashler, Harold; Junge, J A

2004-01-01T23:59:59.000Z

369

The Ergodic Capacity of Interference Networks  

E-Print Network (OSTI)

A. Jafar, The ergodic capacity of interference networks,Gupta and P. R. Kumar, The capacity of wireless networks,cooperation achieves optimal capacity scaling in ad hoc

Jafar, Syed A

2010-01-01T23:59:59.000Z

370

Mapping Individual Variations in Learning Capacity  

E-Print Network (OSTI)

in working memory capacity. Integrative Physiological andVariations in Learning Capacity Eduardo Mercado IIIdifferences in learning capacity are evident in humans and

Mercado III, Eduardo

2011-01-01T23:59:59.000Z

371

Definition: Capacity Emergency | Open Energy Information  

Open Energy Info (EERE)

Emergency Jump to: navigation, search Dictionary.png Capacity Emergency A capacity emergency exists when a Balancing Authority Area's operating capacity, plus firm purchases from...

372

Electric Capacity | OpenEI  

Open Energy Info (EERE)

Capacity Capacity Dataset Summary Description The New Zealand Ministry of Economic Development publishes an annual Energy Outlook, which presents projections of New Zealand's future energy supply, demand, prices and greenhouse gas emissions. The principle aim of these projections is to inform the national energy debate. Included here are the model results for electricity and generation capacity. The spreadsheet provides an interactive tool for selecting which model results to view, and which scenarios to evaluate; full model results for each scenario are also included. Source New Zealand Ministry of Economic Development Date Released Unknown Date Updated December 15th, 2010 (3 years ago) Keywords Electric Capacity Electricity Generation New Zealand projections

373

Adaptive capacity and its assessment  

SciTech Connect

This paper reviews the concept of adaptive capacity and various approaches to assessing it, particularly with respect to climate variability and change. I find that adaptive capacity is a relatively under-researched topic within the sustainability science and global change communities, particularly since it is uniquely positioned to improve linkages between vulnerability and resilience research. I identify opportunities for advancing the measurement and characterization of adaptive capacity by combining insights from both vulnerability and resilience frameworks, and I suggest several assessment approaches for possible future development that draw from both frameworks and focus on analyzing the governance, institutions, and management that have helped foster adaptive capacity in light of recent climatic events.

Engle, Nathan L.

2011-04-20T23:59:59.000Z

374

FERMI LARGE AREA TELESCOPE DETECTION OF BRIGHT {gamma}-RAY OUTBURSTS FROM THE PECULIAR QUASAR 4C +21.35  

SciTech Connect

In this paper, we report on the two-year-long Fermi-Large Area Telescope observation of the peculiar blazar 4C +21.35 (PKS 1222+216). This source was in a quiescent state from the start of the science operations of the Fermi Gamma-ray Space Telescope in 2008 August until 2009 September, and then became more active, with gradually increasing flux and some moderately bright flares. In 2010 April and June, 4C +21.35 underwent a very strong GeV outburst composed of several major flares characterized by rise and decay timescales of the order of a day. During the outburst, the GeV spectra of 4C +21.35 displayed a broken power-law form with spectral breaks observed near 1-3 GeV photon energies. We demonstrate that, at least during the major flares, the jet in 4C +21.35 carried a total kinetic luminosity comparable to the total accretion power available to feed the outflow. We also discuss the origin of the break observed in the flaring spectra of 4C +21.35. We show that, in principle, a model involving annihilation of the GeV photons on the He II Lyman recombination continuum and line emission of 'broad-line region' clouds may account for such. However, we also discuss the additional constraint provided by the detection of 4C +21.35 at 0.07-0.4 TeV energies by the MAGIC telescope, which coincided with one of the GeV flares of the source. We argue that there are reasons to believe that the {approx}< TeV emission of 4C +21.35 (as well as the GeV emission of the source, if co-spatial) is not likely to be produced inside the broad-line region zone of highest ionization ({approx}10{sup 17} cm from the nucleus), but instead originates further away from the active center, namely, around the characteristic scale of the hot dusty torus surrounding the 4C +21.35 nucleus ({approx}10{sup 19} cm).

Tanaka, Y. T.; Stawarz, L.; Saito, S.; Ohno, M.; Takahashi, T. [Institute of Space and Astronautical Science, JAXA, 3-1-1 Yoshinodai, Chuo-ku, Sagamihara, Kanagawa 252-5210 (Japan); Thompson, D. J. [NASA Goddard Space Flight Center, Greenbelt, MD 20771 (United States); D'Ammando, F. [IASF Palermo, 90146 Palermo (Italy); Fegan, S. J. [Laboratoire Leprince-Ringuet, Ecole Polytechnique, CNRS/IN2P3, Palaiseau (France); Lott, B.; Escande, L. [Universite Bordeaux 1, CNRS/IN2p3, Centre d'Etudes Nucleaires de Bordeaux Gradignan, 33175 Gradignan (France); Wood, D. L.; Finke, J. [Space Science Division, Naval Research Laboratory, Washington, DC 20375 (United States); Cheung, C. C. [National Research Council Research Associate, National Academy of Sciences, Washington, DC 20001 (United States); Buson, S. [Istituto Nazionale di Fisica Nucleare, Sezione di Padova, I-35131 Padova (Italy); Donato, D. [Center for Research and Exploration in Space Science and Technology (CRESST) and NASA Goddard Space Flight Center, Greenbelt, MD 20771 (United States); Chiang, J. [W. W. Hansen Experimental Physics Laboratory, Kavli Institute for Particle Astrophysics and Cosmology, Department of Physics and SLAC National Accelerator Laboratory, Stanford University, Stanford, CA 94305 (United States); Giroletti, M. [INAF Istituto di Radioastronomia, 40129 Bologna (Italy); Schinzel, F. K. [Max-Planck-Institut fuer Radioastronomie, Auf dem Huegel 69, 53121 Bonn (Germany); Iafrate, G.; Longo, F., E-mail: tanaka@astro.isas.jaxa.jp [Istituto Nazionale di Fisica Nucleare, Sezione di Trieste, I-34127 Trieste (Italy)

2011-05-20T23:59:59.000Z

375

Data:D2bf19eb-ce3a-4a0c-ab4c-eadf4c9e7767 | Open Energy Information  

Open Energy Info (EERE)

9eb-ce3a-4a0c-ab4c-eadf4c9e7767 9eb-ce3a-4a0c-ab4c-eadf4c9e7767 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Fulton, Kentucky (Utility Company) Effective date: 2012/06/12 End date if known: Rate name: General Power Service 1 Sector: Commercial Description: Available for (0-50kW) demand. Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/203/Fulton_0065.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

376

Data:E27f8bc5-4c14-4c75-b9df-b5d6ebd77803 | Open Energy Information  

Open Energy Info (EERE)

bc5-4c14-4c75-b9df-b5d6ebd77803 bc5-4c14-4c75-b9df-b5d6ebd77803 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bowling Green, Kentucky (Utility Company) Effective date: 2012/05/01 End date if known: Rate name: Residential Sector: Residential Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/202/Bowling%20Green_0061.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

377

Data:Cb2062d7-90f1-4aa2-b0f8-4c56a4c76289 | Open Energy Information  

Open Energy Info (EERE)

d7-90f1-4aa2-b0f8-4c56a4c76289 d7-90f1-4aa2-b0f8-4c56a4c76289 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Intermountain Rural Elec Assn Effective date: 2013/02/01 End date if known: Rate name: Commercial Time of Use Three Phase (E3-TOU) Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

378

Data:3b5b4dd1-a53b-4c73-bee8-7908b5d4c5b0 | Open Energy Information  

Open Energy Info (EERE)

b4dd1-a53b-4c73-bee8-7908b5d4c5b0 b4dd1-a53b-4c73-bee8-7908b5d4c5b0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Effective date: End date if known: Rate name: Outdoor Lighting Nonmetered Memb Owns/Repairs HPS 70 W Sector: Lighting Description: Source or reference: http://www.consumersenergy.coop/programs.php?pn=Security%20Lights&pl=securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

379

Adjusted Estimates of Texas Natural Gas Production  

U.S. Energy Information Administration (EIA) Indexed Site

1 Energy Information Administration 1 Energy Information Administration Adjusted Estimates of Texas Natural Gas Production Background The Energy Information Administration (EIA) is adjusting its estimates of natural gas production in Texas for 2004 and 2005 to correctly account for carbon dioxide (CO 2 ) production. Normally, EIA would wait until publication of the Natural Gas Annual (NGA) before revising the 2004 data, but the adjustments for CO 2 are large enough to warrant making the changes at this time. Prior to 2005, EIA relied exclusively on the voluntary sharing of production data by state and federal government entities to develop its natural gas production estimates. In 2005, EIA began collecting production data directly from operators on the new EIA-914 production

380

metabolic adjustment | OpenEI Community  

Open Energy Info (EERE)

metabolic adjustment metabolic adjustment Home Dc's picture Submitted by Dc(15) Member 15 November, 2013 - 13:26 Living Walls ancient building system architect biomimicry building technology cooling cu daylight design problem energy use engineer fred andreas geothermal green building heat transfer heating living walls metabolic adjustment net zero pre-electricity Renewable Energy Solar university of colorado utility grid Wind Much of the discussion surrounding green buildings centers around reducing energy use. The term net zero is the platinum standard for green buildings, meaning the building in question does not take any more energy from the utility grid than it produces using renewable energy resources, such as solar, wind, or geothermal installations (and sometimes these renewable energy resources actually feed energy back to the utility grid).

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Schrdinger Equation with the Potential $V(r)=a r^2+b r^{-4}+c r^{-6}$  

E-Print Network (OSTI)

By making use of an ${\\it ansatz}$ for the eigenfunction, we obtain the exact solutions to the Schr\\"{o}dinger equation with the anharmonic potential, $V(r)=a r^2+b r^{-4}+c r^{-6}$, both in three dimensions and in two dimensions, where the parameters $a$, $b$, and $c$ in the potential satisfy some constraints.

Shi-Hai Dong; Xi-wen Hou; Zhong-Qi Ma

1998-08-21T23:59:59.000Z

382

Battery Capacity Measurement And Analysis  

E-Print Network (OSTI)

In this paper, we look at different battery capacity models that have been introduced in the literatures. These models describe the battery capacity utilization based on how the battery is discharged by the circuits that consume power. In an attempt to validate these models, we characterize a commercially available lithium coin cell battery through careful measurements of the current and the voltage output of the battery under different load profile applied by a micro sensor node. In the result, we show how the capacity of the battery is affected by the different load profile and provide analysis on whether the conventional battery models are applicable in the real world. One of the most significant finding of our work will show that DC/DC converter plays a significant role in determining the battery capacity, and that the true capacity of the battery may only be found by careful measurements.

Using Lithium Coin; Sung Park; Andreas Savvides; Mani B. Srivastava

2001-01-01T23:59:59.000Z

383

Measuring wind plant capacity value  

DOE Green Energy (OSTI)

Electric utility planners and wind energy researchers pose a common question: What is the capacity value of a wind plant? Tentative answers, which can be phrased in a variety of ways, are based on widely varying definitions and methods of calculation. From the utility`s point of view, a resource that has no capacity value also has a reduced economic value. Utility planners must be able to quantify the capacity value of a wind plant so that investment in conventional generating capacity can be potentially offset by the capacity value of the wind plant. Utility operations personnel must schedule its conventional resources to ensure adequate generation to meet load. Given a choice between two resources, one that can be counted on and the other that can`t, the utility will avoid the risky resource. This choice will be reflected in the price that the utility will pay for the capacity: higher capacity credits result in higher payments. This issue is therefore also important to the other side of the power purchase transaction -- the wind plant developer. Both the utility and the developer must accurately assess the capacity value of wind. This article summarizes and evaluates some common methods of evaluating capacity credit. During the new era of utility deregulation in the United States, it is clear that many changes will occur in both utility planning and operations. However, it is my judgement that the evaluation of capacity credit for wind plants will continue to play an important part in renewable energy development in the future.

Milligan, M.R.

1996-01-01T23:59:59.000Z

384

Data:6ea7e2b2-78d5-446e-bd15-4c5ca9330ef5 | Open Energy Information  

Open Energy Info (EERE)

e2b2-78d5-446e-bd15-4c5ca9330ef5 e2b2-78d5-446e-bd15-4c5ca9330ef5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lubbock, Texas (Utility Company) Effective date: 2010/10/29 End date if known: Rate name: SMALL MUNICIPAL & SCHOOL SERVICE Sector: Commercial Description: * To municipal facilities and public and private schools for electric service supplied at secondary voltage for municipal and school purposes when all service is supplied at one point of delivery and measured through one meter, where facilities of adequate capacity and suitable voltage are adjacent to the premises to be served, and whose load does not exceed 10 kW of demand in any month. Single-phase motors not to exceed 10 horsepower, individual capacity, may be served under this rate. Meters in which the load exceeds 10 kW of demand in any month will be assigned to either Rate 15 (Large School Service) or Rate 17 (Large Municipal Service) as applicable and will not be eligible to be reassigned to Rate 21 until there have been 12 consecutive months where loads have not exceeded 10 kW of demand.

385

Data:B867feb4-c3b5-449e-a0e1-75483a91e1f0 | Open Energy Information  

Open Energy Info (EERE)

7feb4-c3b5-449e-a0e1-75483a91e1f0 7feb4-c3b5-449e-a0e1-75483a91e1f0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coahoma Electric Power Assn Effective date: 2009/01/31 End date if known: Rate name: 13 - Large Commercial Service Sector: Commercial Description: Available to commercial and industrial service requiring between 50 kVA and 499 kVA of transformer capacity. Single phase and three phase at available secondary voltages. Motors having a rate capacity of 10 HP must three phase. Source or reference: Rate Binder Kelly 11 ISU Documentation Source Parent: Comments Applicability Demand (kW)

386

Thermohaline Adjustment and Advection in an OGCM  

Science Conference Proceedings (OSTI)

The response of an ocean general circulation model to the onset of deep-water formation in the North Atlantic Ocean is explored. The processes of baroclinic adjustment to the new deep water mass and the advection of the new deep water mass are ...

Paul J. Goodman

2001-06-01T23:59:59.000Z

387

Geostrophic Adjustment: A Mechanism for Frontogenesis  

Science Conference Proceedings (OSTI)

A simple two-dimensional model is used to determine the geostrophically adjusted state of an initially motionless fluid with lateral density gradient. It is an extension of the much studied two-layer models to the case when the initial ...

Hsien Wang Ou

1984-06-01T23:59:59.000Z

388

On the Energy Conversion during Geostrophic Adjustment  

Science Conference Proceedings (OSTI)

It is found that for a continuously stratified fluid which remains so during the geostrophic adjustment, the energy conversion ratio ? (??KE/?PE) is , in contrast to the value of ? for a two-layer fluid. Since the two-layer fluid is an ...

Hsien Wang Ou

1986-12-01T23:59:59.000Z

389

WEATHER-ADJUSTED PERFORMANCE GUARANTEES Matt Hollingsworth  

E-Print Network (OSTI)

WEATHER-ADJUSTED PERFORMANCE GUARANTEES Matt Hollingsworth Clean Power Research Napa, CA 94559 for solar resource when creating guarantees in order to protect them against the risk created by solar production estimates coupled with a location-specific monthly solar resource index to enable installers

Perez, Richard R.

390

Underground Natural Gas Storage Capacity  

Gasoline and Diesel Fuel Update (EIA)

. . Underground Natural Gas Storage Capacity by State, December 31, 1996 (Capacity in Billion Cubic Feet) Table State Interstate Companies Intrastate Companies Independent Companies Total Number of Active Fields Capacity Number of Active Fields Capacity Number of Active Fields Capacity Number of Active Fields Capacity Percent of U.S. Capacity Alabama................. 0 0 1 3 0 0 1 3 0.04 Arkansas ................ 0 0 3 32 0 0 3 32 0.40 California................ 0 0 10 470 0 0 10 470 5.89 Colorado ................ 4 66 5 34 0 0 9 100 1.25 Illinois ..................... 6 259 24 639 0 0 30 898 11.26 Indiana ................... 6 16 22 97 0 0 28 113 1.42 Iowa ....................... 4 270 0 0 0 0 4 270 3.39 Kansas ................... 16 279 2 6 0 0 18 285 3.57 Kentucky ................ 6 167 18 49 0 0 24 216 2.71 Louisiana................ 8 530 4 25 0 0 12 555 6.95 Maryland ................ 1 62

391

Data:B08ac973-4c3e-4733-896d-9b08f0a82366 | Open Energy Information  

Open Energy Info (EERE)

ac973-4c3e-4733-896d-9b08f0a82366 ac973-4c3e-4733-896d-9b08f0a82366 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Maine Power Co Effective date: 2012/07/01 End date if known: Rate name: A-TOU Residential Time of Use Short Term Sector: Residential Description: AVAILABILITY This rate is available for Residential Service taken on a continuous year-round basis at one point of delivery, except that service may be taken for a shorter period subject to the provisions of the short-term service charge. CHARACTER OF SERVICE End use service will be single phase, alternating current, 60 hertz, furnished at one standard secondary distribution voltage as described in the Company's Handbook of Requirements for Electric Service and Meter Installations. SHORT-TERM SERVICE CHARGE Customers who take short-term service will be billed for the first three months, or fraction thereof, $21.69 per month in addition to the regular monthly electric service rate (including the monthly minimum charge). A credit equal to one-ninth of the amount of short-term service charges billed during the first three months of short-term service will be applied to a short-term customer's bill for each month, or fraction thereof, that the short-term customer's term of service exceeds three months. In no case will the total amount of such credits exceed the total amount of short-term service charges billed. When seasonal service customers take service for less than twelve consecutive months, they will be considered to be short-term customers and their final bills will be adjusted to include any unbilled short-term service charges and credits.

392

Data:3fa75bbc-5746-4c1f-857a-4504265dade9 | Open Energy Information  

Open Energy Info (EERE)

Rate name: Residential Rate: Elim Village Sector: Residential Description: For 1-500 kWh consumed: Rate ( .30 + Cost of Fuel) - (PCE Adjustment) For 501-700 kWh consumed:...

393

COMMUNITY CAPACITY BUILDING THROUGH TECHNOLOGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMMUNITY CAPACITY BUILDING THROUGH TECHNOLOGY COMMUNITY CAPACITY BUILDING THROUGH TECHNOLOGY Empowering Communities in the Age of E-Government Prepared by Melinda Downing, Environmental Justice Program Manager, U.S. Department of Energy MAR 06 MARCH 2006 Since 1999, the Department of Energy has worked with the National Urban Internet and others to create community capacity through technology.  Empowering Communities in the Age of E-Government Table of Contents Message from the Environmental Justice Program Manager . . . . . . . . 3 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Partnerships. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Process Chart: From Agency to Community. . . . . . . . . . . . . . . . . . . 7 Case Studies. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

394

Data:E6b5e40e-f879-4c4b-8654-d72166a4c1a4 | Open Energy Information  

Open Energy Info (EERE)

e40e-f879-4c4b-8654-d72166a4c1a4 e40e-f879-4c4b-8654-d72166a4c1a4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: El Paso Electric Co Effective date: 2010/07/01 End date if known: Rate name: Interruptible power service for cogeneration and small power production facilities (secondary delivery) Sector: Commercial Description: This rate is available to qualifying facilities and to Customers taking service from a third party qualifying facility which qualifies as a small power production and cogeneration faci lity as defined in 18 CFR, Part 292, Subpart S, of the final rules issued by the Federal Energy Regulatory Commission to implement Sections 201 and 210 of the Public Utility Regulatory Policies Act of 1978. Customer will furnish to the Company such data as required by the Company to determine that customer meets the requirements for qualification. The facility may be connected for (1) parallel operation with the Company's service, or (2) isolated operation with Interruptible Power Service provided by the Company by means of a double-throw switch. INTERRUPTIBLE POWER SERVICE RATE - The Interruptible Power Service Rate shall be the Noticed Interruptible Power Service rates currently in effect and applicable to the Customer absent its qualifying facility generation.

395

Data:34d63de4-4c96-4c39-b5f1-545ab2f4d2cb | Open Energy Information  

Open Energy Info (EERE)

de4-4c96-4c39-b5f1-545ab2f4d2cb de4-4c96-4c39-b5f1-545ab2f4d2cb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Seattle, Washington (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Schedule LGD - Large Network General Service Transformer Investment Discount Sector: Commercial Description: SCHEDULE LGD is for network general service provided to customers whose maximum monthly demand is equal to or greater than 1,000 kW. ENERGY CHARGES: Peak: Energy used between six (6:00) a.m. and ten (10:00) p.m., Monday through Saturday, excluding major holidays,* at 7.43¢ per kWh Off-peak: Energy used at all times other than the peak period at 5.01¢ per kWh DEMAND CHARGES: Peak: All kW of maximum demand between six (6:00) a.m. and ten (10:00) p.m., Monday through Saturday, excluding major holidays,* at $2.06 per kW Off-peak: All kW of maximum demand in excess of peak maximum demand, at all times other than the peak period, at $0.26 per kW Minimum Charge: $34.21 per meter per day * 30 days = 1026.30 Discounts: Transformer losses - 1756 + .53285 x kW + .00002 x kW2+ .00527 x kWh Transformer investment - $0.26 per kW of monthly maximum demand

396

Data:86cd4b8a-7929-4c9c-aae4-ff1fc64c7229 | Open Energy Information  

Open Energy Info (EERE)

End date if known: Rate name: Power phase I Sector: Industrial Description: "Subject to energy cost adjustment tracking factor. " This adjustment will change on a quarterly...

397

High Capacity Immobilized Amine Sorbents  

NLE Websites -- All DOE Office Websites (Extended Search)

Capacity Immobilized Amine Sorbents Capacity Immobilized Amine Sorbents Opportunity The Department of Energy's National Energy Technology Laboratory is seeking licensing partners interested in implementing United States Patent Number 7,288,136 entitled "High Capacity Immobilized Amine Sorbents." Disclosed in this patent is the invention of a method that facilitates the production of low-cost carbon dioxide (CO 2 ) sorbents for use in large-scale gas-solid processes. This method treats an amine to increase the number of secondary amine groups and impregnates the amine in a porous solid support. As a result of this improvement, the method increases CO 2 capture capacity and decreases the cost of using an amine-enriched solid sorbent in CO 2 capture systems. Overview The U.S. Department of Energy has placed a high priority on the separation

398

generation capacity | OpenEI  

Open Energy Info (EERE)

generation capacity generation capacity Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords AEO Electricity electricity market module region generation capacity Data application/vnd.ms-excel icon AEO2011: Electricity Generation Capacity by Electricity Market Module Region and Source- Reference Case (xls, 10.6 KiB) Quality Metrics Level of Review Peer Reviewed Comment Temporal and Spatial Coverage Frequency Annually Time Period 2008-2035 License License Open Data Commons Public Domain Dedication and Licence (PDDL) Comment Rate this dataset Usefulness of the metadata Average vote Your vote

399

Building Regulatory Capacity for Change  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Capacity for Change PRESENTED BY Sarah Spencer-Workman, LEED AP July 27, 2011 "How to identify and review laws relevant to buildings and find places and opportunities...

400

Capacity Markets and Market Stability  

Science Conference Proceedings (OSTI)

The good news is that market stability can be achieved through a combination of longer-term contracts, auctions for far enough in the future to permit new entry, a capacity management system, and a demand curve. The bad news is that if and when stable capacity markets are designed, the markets may seem to be relatively close to where we started - with integrated resource planning. Market ideologues will find this anathema. (author)

Stauffer, Hoff

2006-04-15T23:59:59.000Z

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Capacity Value of Wind Power  

Science Conference Proceedings (OSTI)

Power systems are planned such that they have adequate generation capacity to meet the load, according to a defined reliability target. The increase in the penetration of wind generation in recent years has led to a number of challenges for the planning and operation of power systems. A key metric for system adequacy is the capacity value of generation. The capacity value of a generator is the contribution that a given generator makes to overall system adequacy. The variable and stochastic nature of wind sets it apart from conventional energy sources. As a result, the modeling of wind generation in the same manner as conventional generation for capacity value calculations is inappropriate. In this paper a preferred method for calculation of the capacity value of wind is described and a discussion of the pertinent issues surrounding it is given. Approximate methods for the calculation are also described with their limitations highlighted. The outcome of recent wind capacity value analyses in Europe and North America are highlighted with a description of open research questions also given.

Keane, Andrew; Milligan, Michael; Dent, Chris; Hasche, Bernhard; DAnnunzio, Claudine; Dragoon, Ken; Holttinen, Hannele; Samaan, Nader A.; Soder, Lennart; O'Malley, Mark J.

2011-05-04T23:59:59.000Z

402

Data:5d736c01-ed4c-42f1-a944-cff0738312cb | Open Energy Information  

Open Energy Info (EERE)

ed4c-42f1-a944-cff0738312cb ed4c-42f1-a944-cff0738312cb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Lewis County Effective date: End date if known: Rate name: PRIMARY POWER SERVICE Schedule 31-II Sector: Industrial Description: Source or reference: http://www.lcpud.org/schedule31.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2

403

Data:9073b02f-0864-4c46-80b5-b041556591ed | Open Energy Information  

Open Energy Info (EERE)

864-4c46-80b5-b041556591ed 864-4c46-80b5-b041556591ed No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Danville, Virginia (Utility Company) Effective date: 2012/08/28 End date if known: Rate name: Outdoor Rental Lighting Service- Standard Security Lights- (250W HPS) Sector: Lighting Description: Available for outdoor lighting of yards, walkways and other areas. Lights to be served hereunder shall be at locations that are easily and economically accessible to Utility equipment and personnel for construction and maintenance. Source or reference: http://www.danville-va.gov/DocumentCenter/View/8181

404

Data:78292642-8207-4384-a274-6a4c3d288ccc | Open Energy Information  

Open Energy Info (EERE)

2-8207-4384-a274-6a4c3d288ccc 2-8207-4384-a274-6a4c3d288ccc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Heartland Rural Elec Coop, Inc Effective date: 2007/10/29 End date if known: Rate name: MAGELLAN PIPELINE SERVICE Sector: Industrial Description: This schedule is AVAILABLE only for MAGELLAN PIPELINE Company L.P. (Consumer) AT the specific facilities described as follows: Humboldt Pump LOCATED AT J7-9-2 Source or reference: http://www.heartland-rec.com/documents/HRECTarriffsAug09web.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

405

Data:9bdc287b-627a-4c42-b298-536005270bfc | Open Energy Information  

Open Energy Info (EERE)

87b-627a-4c42-b298-536005270bfc 87b-627a-4c42-b298-536005270bfc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Bern, North Carolina (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Street Lighting Service - Overhead 7000 Lumen Mercury Vapor (1 light per 10 customers) Sector: Lighting Description: Source or reference: www.newbern-nc.org/Elec/documents/SLS32B2009.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

406

Data:52a9454f-ab6c-4393-8748-5911d4c91696 | Open Energy Information  

Open Energy Info (EERE)

54f-ab6c-4393-8748-5911d4c91696 54f-ab6c-4393-8748-5911d4c91696 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Auburn Board of Public Works Effective date: 2012/01/01 End date if known: Rate name: Rural Electric Space Heating(Single Phase-Winter) Sector: Commercial Description: To customers outside the corporate limits of the city of Auburn, NE as a rider to the General Service or Demand Service where only electric heating, cooling, and electric water heating, and associated equipment are connected as a separate service. Source or reference: http://auburnbpw.com/wp-content/files/2012_Electric_Rates.pdf

407

Data:873f3c80-4c64-4330-813c-54044054ab55 | Open Energy Information  

Open Energy Info (EERE)

c80-4c64-4330-813c-54044054ab55 c80-4c64-4330-813c-54044054ab55 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alabama Power Co Effective date: End date if known: Rate name: 175 MERCURY VAPOR OPEN STANDARD LUMINIARIES Sector: Lighting Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

408

Data:0ace92dc-225c-4c10-8914-3efed13590bc | Open Energy Information  

Open Energy Info (EERE)

ace92dc-225c-4c10-8914-3efed13590bc ace92dc-225c-4c10-8914-3efed13590bc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Edmond, Oklahoma (Utility Company) Effective date: 2009/09/30 End date if known: Rate name: OSL-1 Outdoor Security Lighting (existing wood pole)-25 ft Sector: Lighting Description: Source or reference: http://edmondok.com/DocumentCenter/Home/View/442 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

409

Data:55689117-e54b-4c37-bba6-3795541345d9 | Open Energy Information  

Open Energy Info (EERE)

e54b-4c37-bba6-3795541345d9 e54b-4c37-bba6-3795541345d9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Monroe, Georgia (Utility Company) Effective date: 2012/03/01 End date if known: Rate name: City Electric Service Sector: Commercial Description: Applicable to all aspects of the government of the City of Monroe, including, but not limited to, general government buildings and warehouses, recreation facilities, and all other City utility enterprise activities, including natural gas, water, sanitary sewer and CATV/Internet Source or reference: ISU Documentation Source Parent:

410

Data:6903575f-5dbf-4c6e-9cc2-b406b4168871 | Open Energy Information  

Open Energy Info (EERE)

575f-5dbf-4c6e-9cc2-b406b4168871 575f-5dbf-4c6e-9cc2-b406b4168871 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbus Southern Power Co Effective date: 2012/03/09 End date if known: Rate name: Residential Energy Storage Sector: Residential Description: Available for residential customers who use energy storage devices with time-differentiated load characteristics approved by the Company, such as electric thermal storage space heating and/or cooling equipment and water heaters which consume electrical energy only during off-peak hours specified by the Company and store energy for use during on-peak hours.

411

Data:59faa62e-76ce-4c71-ba7b-470051aae296 | Open Energy Information  

Open Energy Info (EERE)

faa62e-76ce-4c71-ba7b-470051aae296 faa62e-76ce-4c71-ba7b-470051aae296 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc (New Mexico) Effective date: 2010/05/01 End date if known: Rate name: Large Power Facility Charge Sector: Commercial Description: Source or reference: Rate Binder#8 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

412

Data:329aaa14-a4b0-4c30-8523-736731686a34 | Open Energy Information  

Open Energy Info (EERE)

aaa14-a4b0-4c30-8523-736731686a34 aaa14-a4b0-4c30-8523-736731686a34 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Belmont, Wisconsin (Utility Company) Effective date: 2007/03/12 End date if known: Rate name: Ms-1 Street and Security Lighting Service: 250W HPS(Overhead) Sector: Lighting Description: This schedule will be applied to municipal street light lighting. The Utility will furnish, install, and maintain street lighting units. Commitment to Community Program Rider: 2.0% of the total electric bill. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=440

413

Data:Adff1039-9055-4c24-9ccd-ba7357436cdb | Open Energy Information  

Open Energy Info (EERE)

Adff1039-9055-4c24-9ccd-ba7357436cdb Adff1039-9055-4c24-9ccd-ba7357436cdb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Benton County Effective date: 2012/01/01 End date if known: Rate name: Large Industrial General Service Non Time-of-Use Sector: Commercial Description: Source or reference: http://www.bentonpud.org/images/site/flipbooks/BentonPUDPolicyRates%20%282%29/#/12/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

414

Data:67f496ff-60de-4c74-a30c-d54736038363 | Open Energy Information  

Open Energy Info (EERE)

ff-60de-4c74-a30c-d54736038363 ff-60de-4c74-a30c-d54736038363 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tell City, Indiana (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Street Lighting: HPS Vapor, 100 Watts Sector: Lighting Description: The Fixed monthly charge entered here is the sum of the "Facilities" charge ($6.46) and the "Usage" charge ($1.07). When applicable: add $3.24 to the "Facilities" charge for Wood Pole, add $6.74 to the "Facilities" charge for Metal Round Pole Aluminum, add $11.33 to the "Facilities" charge for Metal Round Steel Decorative

415

Data:Ced86dcc-524e-4c97-b136-9567226db968 | Open Energy Information  

Open Energy Info (EERE)

Ced86dcc-524e-4c97-b136-9567226db968 Ced86dcc-524e-4c97-b136-9567226db968 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Mansfield, Massachusetts (Utility Company) Effective date: 2008/01/01 End date if known: Rate name: GENERAL SERVICE POWER RATE Sector: Commercial Description: Source or reference: https://www.mansfieldelectric.com/rateGeneralPower.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

416

Data:7720700d-783d-4c93-b509-fb3110ecea58 | Open Energy Information  

Open Energy Info (EERE)

d-783d-4c93-b509-fb3110ecea58 d-783d-4c93-b509-fb3110ecea58 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Itta Bena, Mississippi (Utility Company) Effective date: End date if known: Rate name: Residential Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

417

Data:87e49727-0344-4703-8e14-adc21f29ac4c | Open Energy Information  

Open Energy Info (EERE)

e49727-0344-4703-8e14-adc21f29ac4c e49727-0344-4703-8e14-adc21f29ac4c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bloomer Electric & Water Co Effective date: 1999/09/15 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Primary Metering Discount Sector: Industrial Description: This rate will be applied to customers for all types of service, if their monthly Maximum Measured Demand is in excess of 200 kilowatts per month for three or more months in a consecutive 12-month period. Fixed Monthly Charge includes Commitment to Community Rider: $1.33 per customer per month.

418

Data:402afbd9-153d-4c91-bc03-e665f1268539 | Open Energy Information  

Open Energy Info (EERE)

afbd9-153d-4c91-bc03-e665f1268539 afbd9-153d-4c91-bc03-e665f1268539 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: NSTAR Electric Company Effective date: 2012/03/01 End date if known: Rate name: ACTON Basic rate T1 Sector: Commercial Description: Default Generation Service ("Default Service") shall be available to any Customer who, for any reason, is not receiving Generation Service from a Competitive Supplier. Service under this rate to any Customer is subject to both the Company's printed requirements and the Company's Terms and Conditions - Distribution Service, each as in effect from time to time.

419

Data:08648ff9-d4c8-4187-ac74-9367450ddd88 | Open Energy Information  

Open Energy Info (EERE)

ff9-d4c8-4187-ac74-9367450ddd88 ff9-d4c8-4187-ac74-9367450ddd88 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of St Marys, Ohio (Utility Company) Effective date: 2001/06/10 End date if known: Rate name: Industrial General Service Transmission Rate-Metering Discount Sector: Industrial Description: *This rate is available for lighting and power for those customers establishing a minimum of 3,000 KW demand. character of service:Standard transmission service voltages as provided in rules and regulations, Alternating Current 60 Hertz (cycles per second). minimum monthly charge:The minimum monthly charge will be based upon a billing demand of no less than 3,000 KW demand.

420

Data:21179d42-d0da-4c68-a43d-196baeec705d | Open Energy Information  

Open Energy Info (EERE)

-d0da-4c68-a43d-196baeec705d -d0da-4c68-a43d-196baeec705d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Shelby, Ohio (Utility Company) Effective date: End date if known: Rate name: Schedule D Sector: Description: Available for electrical energy used for city-owned and operated facilities. Source or reference: http://www.amlegal.com/nxt/gateway.dll/Ohio/shelby_oh/parttenstreetsutilitiesandpublicservices/titlefour-utilities/chapter1050electricity?f=templates$fn=default.htm$3.0$vid=amlegal:shelby_oh$anc=JD_1050.02 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Data:732931fc-2792-4c74-a9bc-46268f9acabd | Open Energy Information  

Open Energy Info (EERE)

31fc-2792-4c74-a9bc-46268f9acabd 31fc-2792-4c74-a9bc-46268f9acabd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Auburn Board of Public Works Effective date: 2012/01/01 End date if known: Rate name: Rural Electric Space Heating(Single Phase-Summer) Sector: Commercial Description: To customers outside the corporate limits of the city of Auburn, NE as a rider to the General Service or Demand Service where only electric heating, cooling, and electric water heating, and associated equipment are connected as a separate service. Source or reference: http://auburnbpw.com/wp-content/files/2012_Electric_Rates.pdf

422

Data:46bba496-cf9c-4c24-b977-f8317882406f | Open Energy Information  

Open Energy Info (EERE)

bba496-cf9c-4c24-b977-f8317882406f bba496-cf9c-4c24-b977-f8317882406f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Platte-Clay Electric Coop, Inc Effective date: 2013/01/01 End date if known: Rate name: SL - 150 watt HPS Blvd Light Sector: Lighting Description: Available for lighting streets, walkways, or outdoor lighting of public or private areas when such facilities are operated and maintained as an extension of the Cooperative's distribution system. Electric usage will be unmetered. Source or reference: Rate Binder Kelly 11 ISU Documentation Source Parent: Comments Applicability Demand (kW)

423

Data:43741c92-9389-4d33-b4c9-93b870961606 | Open Energy Information  

Open Energy Info (EERE)

1c92-9389-4d33-b4c9-93b870961606 1c92-9389-4d33-b4c9-93b870961606 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Greenville Utilities Comm Effective date: 2009/10/01 End date if known: Rate name: County, Municipal, or Housing Authority Outdoor Lighting- 150W Sodium Vapor Sector: Lighting Description: This schedule is applicable to any county or municipality, or to any Housing Authority project created under Chapter 157 of the General Statutes of North Carolina; or any board, agency, or authority thereof for outdoor lighting service, except where installations are prevented by any public authority having jurisdiction or are otherwise unlawful.

424

Data:263dc863-67bd-4202-a98c-5bbac4c653fd | Open Energy Information  

Open Energy Info (EERE)

dc863-67bd-4202-a98c-5bbac4c653fd dc863-67bd-4202-a98c-5bbac4c653fd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Seattle, Washington (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Schedule MDB- Medium Standard General Service:Burien(First Avenue South 1 Undergrounding Charge-Transformer Investment Discount) Sector: Commercial Description: SCHEDULE MDB is for standard general service provided to City of Burien customers whose maximum demand is equal to or greater than 50 kW but less than 1,000 kW. Minimum Charge: 73.00¢ per meter per day (to be implemented when billing system can include it)

425

Data:7bbca250-ddef-4336-ad36-2011cefe4c6c | Open Energy Information  

Open Energy Info (EERE)

bbca250-ddef-4336-ad36-2011cefe4c6c bbca250-ddef-4336-ad36-2011cefe4c6c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Memphis Light, Gas & Water Effective date: 2011/09/30 End date if known: Rate name: OUTDOOR LIGHTING RATE Part B Sector: Lighting Description: Available for service to street and park lighting systems, traffic signal systems, athletic field lighting installations, and outdoor lighting for individual customers. Source or reference: http://www.mlgw.com/images/content/files/pdf_rates/LSOct11.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

426

Data:22dfb476-09ef-4c77-b731-2151bae15623 | Open Energy Information  

Open Energy Info (EERE)

22dfb476-09ef-4c77-b731-2151bae15623 22dfb476-09ef-4c77-b731-2151bae15623 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wellton-Mohawk Irr & Drain Dist Effective date: 2012/01/01 End date if known: Rate name: General Service Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

427

Data:07172f1e-81fa-4c94-9065-caafc7f0cadc | Open Energy Information  

Open Energy Info (EERE)

e-81fa-4c94-9065-caafc7f0cadc e-81fa-4c94-9065-caafc7f0cadc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tipton Municipal Electric Util Effective date: 2004/08/13 End date if known: Rate name: Rate E- Outdoor Lighting Service: 175 Watt Mercury Vapor Sector: Lighting Description: Add $1.15 per month, if pole installation is required. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

428

Data:224375d4-625d-4c80-86bc-04592da86106 | Open Energy Information  

Open Energy Info (EERE)

d4-625d-4c80-86bc-04592da86106 d4-625d-4c80-86bc-04592da86106 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Orange City, Iowa (Utility Company) Effective date: 2009/10/18 End date if known: Rate name: Industrial Rate Sector: Industrial Description: Source or reference: Rate Binder#1B(Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

429

Data:29b3ecf8-f074-4253-8cae-4c7578054669 | Open Energy Information  

Open Energy Info (EERE)

ecf8-f074-4253-8cae-4c7578054669 ecf8-f074-4253-8cae-4c7578054669 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Inter County Energy Coop Corp Effective date: 2011/06/01 End date if known: Rate name: 27500 Lumen - Directional Flood Light Sector: Lighting Description: Source or reference: http://www.intercountyenergy.net/content/energy-rates-net-metering Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

430

Data:42680856-2f2f-4c0c-9ce2-beba80161987 | Open Energy Information  

Open Energy Info (EERE)

856-2f2f-4c0c-9ce2-beba80161987 856-2f2f-4c0c-9ce2-beba80161987 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Tennessee (Utility Company) Effective date: 2011/04/01 End date if known: Rate name: Seasonal Demand, General Power rate-- Schedule SGSC Sector: Industrial Description: This rate shall apply to the firm electric power requirements where a customer's currently effective contract demand is greater than 15,000 kW but not more than 25,000 kW. Source or reference: http://www.clevelandutilities.com/PDF/2011JulyElectricRates.pdf Source Parent: Comments Applicability

431

P-D Project Rate Adjustment  

NLE Websites -- All DOE Office Websites (Extended Search)

Parker-Davis Project Rate Adjustment Data Parker-Davis Project Rate Adjustment Data FY2014 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design Preliminary PRS Final Documents Notification of Rates Final CAS Final Rate Design Final PRS FY2013 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design Preliminary PRS Supplemental Information Final Documents Notification of Rates Final CAS Final Rate Design Final PRS FY2012 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design Preliminary PRS Customer Requested Scenario Final Documents Notification of Rates Final CAS Final Rate Design Final PRS FY2011 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design

432

Article mounting and position adjustment stage  

DOE Patents (OSTI)

An improved adjustment and mounting stage of the type used for the detection of laser beams is disclosed. A ring sensor holder has locating pins on a first side thereof which are positioned within a linear keyway in a surrounding housing for permitting reciprocal movement of the ring along the keyway. A rotatable ring gear is positioned within the housing on the other side of the ring from the linear keyway and includes an oval keyway which drives the ring along the linear keyway upon rotation of the gear. Motor-driven single-stage and dual (x, y) stage adjustment systems are disclosed which are of compact construction and include a large laser transmission hole. 6 figs.

Cutburth, R.W.; Silva, L.L.

1988-05-10T23:59:59.000Z

433

The Higgs Boson Width is Adjustable  

E-Print Network (OSTI)

We show that it is possible to construct models in which the width of the Higgs boson is arbitrary- either smaller or larger than a standard model Higgs boson of the same mass. There are no new fields into which the Higgs boson decays. Instead, the coupling of the Higgs boson to the gauge bosons is adjusted. We construct and analyze weaklycoupled models with arbitrarywidth Higgs bosons to investigate the phenomenology one might find in a strongly interacting model. In any such model new physics must enter at a mass scale which decreases as the Higgs boson width is adjusted away from its standard model value. In particular, if the Higgs boson is wider than the standard model Higgs boson, then interesting new physics must appear in the isospintwo channel.

R. Sekhar Chivukulaa; Michael J. Dugana

1994-01-01T23:59:59.000Z

434

The Higgs Boson Width is Adjustable  

E-Print Network (OSTI)

We show that it is possible to construct models in which the width of the Higgs boson is arbitrary - either smaller or larger than a standard model Higgs boson of the same mass. There are no new fields into which the Higgs boson decays. Instead, the coupling of the Higgs boson to the gauge bosons is adjusted. We construct and analyze weakly--coupled models with arbitrary--width Higgs bosons to investigate the phenomenology one might find in a strongly interacting model. In any such model new physics must enter at a mass scale which decreases as the Higgs boson width is adjusted away from its standard model value. In particular, if the Higgs boson is wider than the standard model Higgs boson, then interesting new physics must appear in the isospin--two channel.

R. Sekhar Chivukula; Michael J. Dugan; Mitchell Golden

1994-06-10T23:59:59.000Z

435

Atmospheric Crude Oil Distillation Operable Capacity  

Gasoline and Diesel Fuel Update (EIA)

(Barrels per Calendar Day) (Barrels per Calendar Day) Data Series: Total Number of Operable Refineries Number of Operating Refineries Number of Idle Refineries Atmospheric Crude Oil Distillation Operable Capacity (B/CD) Atmospheric Crude Oil Distillation Operating Capacity (B/CD) Atmospheric Crude Oil Distillation Idle Capacity (B/CD) Atmospheric Crude Oil Distillation Operable Capacity (B/SD) Atmospheric Crude Oil Distillation Operating Capacity (B/SD) Atmospheric Crude Oil Distillation Idle Capacity (B/SD) Vacuum Distillation Downstream Charge Capacity (B/SD) Thermal Cracking Downstream Charge Capacity (B/SD) Thermal Cracking Total Coking Downstream Charge Capacity (B/SD) Thermal Cracking Delayed Coking Downstream Charge Capacity (B/SD Thermal Cracking Fluid Coking Downstream Charge Capacity (B/SD) Thermal Cracking Visbreaking Downstream Charge Capacity (B/SD) Thermal Cracking Other/Gas Oil Charge Capacity (B/SD) Catalytic Cracking Fresh Feed Charge Capacity (B/SD) Catalytic Cracking Recycle Charge Capacity (B/SD) Catalytic Hydro-Cracking Charge Capacity (B/SD) Catalytic Hydro-Cracking Distillate Charge Capacity (B/SD) Catalytic Hydro-Cracking Gas Oil Charge Capacity (B/SD) Catalytic Hydro-Cracking Residual Charge Capacity (B/SD) Catalytic Reforming Charge Capacity (B/SD) Catalytic Reforming Low Pressure Charge Capacity (B/SD) Catalytic Reforming High Pressure Charge Capacity (B/SD) Catalytic Hydrotreating/Desulfurization Charge Capacity (B/SD) Catalytic Hydrotreating Naphtha/Reformer Feed Charge Cap (B/SD) Catalytic Hydrotreating Gasoline Charge Capacity (B/SD) Catalytic Hydrotreating Heavy Gas Oil Charge Capacity (B/SD) Catalytic Hydrotreating Distillate Charge Capacity (B/SD) Catalytic Hydrotreating Kerosene/Jet Fuel Charge Capacity (B/SD) Catalytic Hydrotreating Diesel Fuel Charge Capacity (B/SD) Catalytic Hydrotreating Other Distillate Charge Capacity (B/SD) Catalytic Hydrotreating Residual/Other Charge Capacity (B/SD) Catalytic Hydrotreating Residual Charge Capacity (B/SD) Catalytic Hydrotreating Other Oils Charge Capacity (B/SD) Fuels Solvent Deasphalting Charge Capacity (B/SD) Catalytic Reforming Downstream Charge Capacity (B/CD) Total Coking Downstream Charge Capacity (B/CD) Catalytic Cracking Fresh Feed Downstream Charge Capacity (B/CD) Catalytic Hydro-Cracking Downstream Charge Capacity (B/CD) Period:

436

Remote control for anode-cathode adjustment  

DOE Patents (OSTI)

An apparatus for remotely adjusting the anode-cathode gap in a pulse power machine has an electric motor located within a hollow cathode inside the vacuum chamber of the pulse power machine. Input information for controlling the motor for adjusting the anode-cathode gap is fed into the apparatus using optical waveguides. The motor, controlled by the input information, drives a worm gear that moves a cathode tip. When the motor drives in one rotational direction, the cathode is moved toward the anode and the size of the anode-cathode gap is diminished. When the motor drives in the other direction, the cathode is moved away from the anode and the size of the anode-cathode gap is increased. The motor is powered by batteries housed in the hollow cathode. The batteries may be rechargeable, and they may be recharged by a photovoltaic cell in combination with an optical waveguide that receives recharging energy from outside the hollow cathode. Alternatively, the anode-cathode gap can be remotely adjusted by a manually-turned handle connected to mechanical linkage which is connected to a jack assembly. The jack assembly converts rotational motion of the handle and mechanical linkage to linear motion of the cathode moving toward or away from the anode.

Roose, Lars D. (Albuquerque, NM)

1991-01-01T23:59:59.000Z

437

Remote control for anode-cathode adjustment  

DOE Patents (OSTI)

An apparatus for remotely adjusting the anode-cathode gap in a pulse power machine has an electric motor located within a hollow cathode inside the vacuum chamber of the pulse power machine. Input information for controlling the motor for adjusting the anode-cathode gap is fed into the apparatus using optical waveguides. The motor, controlled by the input information, drives a worm gear that moves a cathode tip. When the motor drives in one rotational direction, the cathode is moved toward the anode and the size of the anode-cathode gap is diminished. When the motor drives in the other direction, the cathode is moved away from the anode and the size of the anode-cathode gap is increased. The motor is powered by batteries housed in the hollow cathode. The batteries may be rechargeable, and they may be recharged by a photovoltaic cell in combination with an optical waveguide that receives recharging energy from outside the hollow cathode. Alternatively, the anode-cathode gap can be remotely adjusted by a manually-turned handle connected to mechanical linkage which is connected to a jack assembly. The jack assembly converts rotational motion of the handle and mechanical linkage to linear motion of the cathode moving toward or away from the anode. 3 figs.

Roose, L.D.

1989-10-04T23:59:59.000Z

438

Michalis Nikiforos On the Desired Rate of Capacity Utilization  

E-Print Network (OSTI)

This paper examines the endogeneity (or lack thereof) of the rate of capacity utilization in the long run within the context of the controversy surrounding the Kaleckian model of growth and distribution. We argue that the proposed long-run dynamic adjustment, proposed by Kaleckian scholars, lacks a coherent economic rationale. We provide economic justification for the adjustment of the desired rate of utilization towards the actual rate on behalf of a cost-minimizing firm, after examining the factors that determine the utilization of resources. The cost minimizing firm has an incentive to increase the utilization of its capital if the rate of the returns to scale decreases as its production increases. We show that there are evidence in the theory and the empirical research that justify this behavior of returns to scale. In that way the desired rate of utilization becomes endogenous.

Michalis Nikiforos; Laura Barbosa De Carvalho; Christian Schoder; Jonathan Cogliano For Useful

2011-01-01T23:59:59.000Z

439

Data:9f42c34e-a4c7-4468-bc24-9cc9c8d2d26d | Open Energy Information  

Open Energy Info (EERE)

e-a4c7-4468-bc24-9cc9c8d2d26d e-a4c7-4468-bc24-9cc9c8d2d26d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sacramento Municipal Utility District Effective date: 2013/01/01 End date if known: 2013/12/31 Rate name: RSCH - Three Phase Sector: Residential Description: Electric space rate Source or reference: https://www.smud.org/en/residential/customer-service/rate-information/rates-rules-regulations.htm Source Parent: Comments The Adjustment here is the solar energy Surcharge Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

440

Data:F84c3768-5d38-4c2a-855e-e03f50e2d3e1 | Open Energy Information  

Open Energy Info (EERE)

c3768-5d38-4c2a-855e-e03f50e2d3e1 c3768-5d38-4c2a-855e-e03f50e2d3e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawaiian Electric Co Inc Effective date: 2011/03/01 End date if known: Rate name: ENERGY COST ADJUSTMENT CLAUSE Sector: Commercial Description: Applicable to Schedule R, G, J, DS, P, F, U, TOU-R, TOU-G, TOU-J, SS, TOU EV, EV-R and EV-C. For more information, see the source of rate. Source or reference: http://www.mauielectric.com/vcmcontent/FileScan/PDF/EnergyServices/Tarrifs/HECO/HECORatesECAC.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

Note: This page contains sample records for the topic "4c capacity adjusted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Data:32e97d8e-4c1f-4fc5-9ec7-5f6b4eaddc0d | Open Energy Information  

Open Energy Info (EERE)

e-4c1f-4fc5-9ec7-5f6b4eaddc0d e-4c1f-4fc5-9ec7-5f6b4eaddc0d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cairo, Georgia (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: General Service Electric Rates GS-1 (Multi Phase) Sector: Commercial Description: This rate is applicable to all non residential customers whose highest annual peak demand does not exceed 50 KW. Subject to Power Cost Adjustment. Source or reference: Rate Binder # 2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

442

Data:2c54c2ef-c05e-4d4c-b8f0-4b45512d3ad8 | Open Energy Information  

Open Energy Info (EERE)

c2ef-c05e-4d4c-b8f0-4b45512d3ad8 c2ef-c05e-4d4c-b8f0-4b45512d3ad8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Maryland Elec Coop Inc Effective date: 2011/01/05 End date if known: Rate name: General Service Demand 3 Phase Commercial Sector: Commercial Description: Available to commercial and industrial Customers and all schools, churches and community halls throughout the area served by the Cooperative for all uses where the peak demand exceeds 25 kW, subject to the established rules and regulations of the Cooperative Customers receiving Standard Offer Service as defined in the General Terms and Conditions will pay A) the Standard Offer Service Charge, B) the Distribution Charge, and C) the Facilities Charge. These Customers will also pay the monthly purchased power cost adjustment.

443

Data:93f489c0-a47a-4c37-920e-b1dd35f0a5b4 | Open Energy Information  

Open Energy Info (EERE)

f489c0-a47a-4c37-920e-b1dd35f0a5b4 f489c0-a47a-4c37-920e-b1dd35f0a5b4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Whitehall Electric Utility Effective date: 2010/02/15 End date if known: Rate name: General Service- Time-of-Day- Single-Phase- Peak: 8am-8pm Sector: Commercial Description: This rate schedule is optional to all Gs-1, General Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

444

Data:D0b4b8ae-a98a-4c8b-8b5b-27be8eb20c72 | Open Energy Information  

Open Energy Info (EERE)

ae-a98a-4c8b-8b5b-27be8eb20c72 ae-a98a-4c8b-8b5b-27be8eb20c72 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL - 24h HPS 150w Sector: Lighting Description: Applicable to the Colorado Department of Transportation and municipalities for Customer-Owned Lighting Service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

445

Data:0a6670af-b5e1-4c9b-ada1-5c6e425ac375 | Open Energy Information  

Open Energy Info (EERE)

0af-b5e1-4c9b-ada1-5c6e425ac375 0af-b5e1-4c9b-ada1-5c6e425ac375 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Lodi, Ohio (Utility Company) Effective date: 2007/03/15 End date if known: Rate name: Commercial Large Power Rate-In Village Discount Sector: Commercial Description: *Applicable for three phase industrial load management service for customers with 50 kVA or greater demands and/or served at primary distribution voltage through one meter. 5% discount for being inside village limits. Subject to Power Cost Adjustment and Ohio kWh Tax. State of Ohio Kilowatt-Hour Tax Tax rates are applied to all kWH usage:

446

Data:Cf1b762a-e6c1-4c6b-b3f6-2de0515947a5 | Open Energy Information  

Open Energy Info (EERE)

Cf1b762a-e6c1-4c6b-b3f6-2de0515947a5 Cf1b762a-e6c1-4c6b-b3f6-2de0515947a5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wisconsin Rapids W W & L Comm Effective date: 2009/01/01 End date if known: Rate name: Street Lighting Metal Halide 250 W Overhead Sector: Lighting Description: The Purchase Cost Adjustment Clause, a charge per all kWh that varies monthly, applies to this rate. Source or reference: http://www.wrwwlc.com/StreetYard.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

447

Data:75e85d3b-282e-4e80-b3b1-28c4c21fd2a4 | Open Energy Information  

Open Energy Info (EERE)

d3b-282e-4e80-b3b1-28c4c21fd2a4 d3b-282e-4e80-b3b1-28c4c21fd2a4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Gs-2 General Service-Optional Time-of-Day Single Phase Sector: Commercial Description: This rate schedule is optional to all Gs-1, General Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

448

production capacity | OpenEI  

Open Energy Info (EERE)

production capacity production capacity Dataset Summary Description No description given. Source Oak Ridge National Laboratory Date Released November 30th, 2009 (4 years ago) Date Updated Unknown Keywords biodiesel ethanol location production capacity transportation Data application/zip icon Biorefineries.zip (zip, 7 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Other or unspecified, see optional comment below Comment Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset Average vote Your vote Ease of access Average vote Your vote Overall rating Average vote Your vote Comments Login or register to post comments If you rate this dataset, your published comment will include your rating.

449

installed capacity | OpenEI  

Open Energy Info (EERE)

installed capacity installed capacity Dataset Summary Description Estimates for each of the 50 states and the entire United States show Source Wind Powering America Date Released February 04th, 2010 (4 years ago) Date Updated April 13th, 2011 (3 years ago) Keywords annual generation installed capacity usa wind Data application/vnd.ms-excel icon Wind potential data (xls, 102.4 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Other or unspecified, see optional comment below Comment Work of the U.S. Federal Government. Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset Average vote Your vote Ease of access Average vote Your vote Overall rating Average vote Your vote Comments

450