National Library of Energy BETA

Sample records for 242-a evaporator hanford

  1. 242-A Evaporator - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    began operating in 1977 to reduce the volume of waste stored in Hanford's underground tanks. The 242-A Evaporator is the only operating nuclear processing facility at Hanford. It...

  2. Technical support for authorization of 242-A evaporator campaign 97-2, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Daling, P.M.; Lavender, J.C.

    1997-07-01

    An analysis was performed to determine the acceptability of processing 242-A Evaporator/Crystallizer Campaign 97-2 feed. Inhalation unit liter doses (ULDs) were calculated using the methods and data described in the Tank Waste Remediation System Basis for Interim Operation (TWRS BIO) and 242-A Evaporator/Crystallizer Safety Analysis Report. The ULD calculated for the Campaign 97-2 slurry was found to be less than the TWRS BIO evaporator slurry ULD and so would be within the analyzed safety envelope defined in the TWRS BIO. The Evaporator slurry ULD established in the TWRS BIO and supporting documents was calculated using the bounding source strength defined in the 242-A Evaporator SAR. Consequently, the risks and consequences associated with the Campaign 97-2 slurry would be lower than those already accepted by DOE and documented in the TWRS BIO and 242-A Evaporator SAR. The direct radiation exposures from formation of a liquid pool of Campaign 97-2 slurry were demonstrated to be less than the exposures from a pool formed by bounding source strength evaporator slurry as defined in the 242-A Evaporator SAR. This was demonstrated via a comparison of the Campaign 97-2 slurry composition and the 242-A Evaporator SAR bounding source strength. It was concluded that the direct radiation exposures from Campaign 97-2 slurry would be within the analyzed safety envelope in the 242-A Evaporator SAR.

  3. 242-A evaporator safety analysis report

    SciTech Connect (OSTI)

    CAMPBELL, T.A.

    1999-05-17

    This report provides a revised safety analysis for the upgraded 242-A Evaporator (the Evaporator). This safety analysis report (SAR) supports the operation of the Evaporator following life extension upgrades and other facility and operations upgrades (e.g., Project B-534) that were undertaken to enhance the capabilities of the Evaporator. The Evaporator has been classified as a moderate-hazard facility (Johnson 1990). The information contained in this SAR is based on information provided by 242-A Evaporator Operations, Westinghouse Hanford Company, site maintenance and operations contractor from June 1987 to October 1996, and the existing operating contractor, Waste Management Hanford (WMH) policies. Where appropriate, a discussion address the US Department of Energy (DOE) Orders applicable to a topic is provided. Operation of the facility will be compared to the operating contractor procedures using appropriate audits and appraisals. The following subsections provide introductory and background information, including a general description of the Evaporator facility and process, a description of the scope of this SAR revision,a nd a description of the basic changes made to the original SAR.

  4. 242-A Evaporator - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    300 Area 324 Building 325 Building 400 AreaFast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim ...

  5. 242-A Evaporator quality assurance plan. Revision 2

    SciTech Connect (OSTI)

    Basra, T.S.

    1995-05-04

    The purpose of this quality assurance project plan (Plan) is to provide requirements for activities pertaining to sampling, shipping, and analyses associated with candidate feed tank samples for the 242-A Evaporator project. The purpose of the 242-A Evaporator project is to reduce the volume of aqueous waste in the Double Shell Tank (DST) System and will result in considerable savings to the disposal of mixed waste. The 242-A Evaporator feed stream originates from DSTs identified as candidate feed tanks. The 242-A Evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending the condensate (called process condensate) to the Liquid Effluent Retention Facility (LEPF) storage basin where it is stored prior to treatment in the Effluent Treatment Facility (ETF). The objective of this quality assurance project plan is to provide the planning, implementation, and assessment of sample collection and analysis, data issuance, and validation activities for the candidate feed tanks.

  6. Engineering work plan for implementing the Process Condensate Recycle Project at the 242-A evaporator

    SciTech Connect (OSTI)

    Haring, D.S.

    1995-02-02

    The 242-A Evaporator facility is used to reduce the volume of waste stored in the Hanford double shell tanks. This facility uses filtered raw water for cooling, de-entrainment pad sprays, pump seal water, and chemical tank make-up. Some of these uses result in the introduction of filtered raw water into the process, thus increasing the volume of waste requiring evaporation and subsequent treatment by the 200 East Effluent Treatment Facility. The pump seal water and the de-entrainment pad spray systems were identified as candidates for a waste minimization upgrade. This work plan describes the activities associated with the design, installation, testing and initial operation of the process condensate recycle system. Implementation of the process condensate recycle system will permit the use of process condensate in place of raw water for the de-entrainment pad sprays and pump seals. This will reduce the amount of low-level liquid waste and generated during facility operation through source reduction and recycling.

  7. High-level waste storage tank farms/242-A evaporator standards/requirements identification document (S/RID), Vol. 4

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    Radiation protection of personnel and the public is accomplished by establishing a well defined Radiation Protection Organization to ensure that appropriate controls on radioactive materials and radiation sources are implemented and documented. This Requirements Identification Document (RID) applies to the activities, personnel, structures, systems, components, and programs involved in executing the mission of the Tank Farms. The physical boundaries within which the requirements of this RID apply are the Single Shell Tank Farms, Double Shell Tank Farms, 242-A Evaporator-Crystallizer, 242-S, T Evaporators, Liquid Effluent Retention Facility (LERF), Purgewater Storage Facility (PWSF), and all interconnecting piping, valves, instrumentation, and controls. Also included is all piping, valves, instrumentation, and controls up to and including the most remote valve under Tank Farms control at any other Hanford Facility having an interconnection with Tank Farms. The boundary of the structures, systems, components, and programs to which this RID applies, is defined by those that are dedicated to and/or under the control of the Tank Farms Operations Department and are specifically implemented at the Tank Farms.

  8. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 5

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 5) outlines the standards and requirements for the Fire Protection and Packaging and Transportation sections.

  9. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 4

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 4) presents the standards and requirements for the following sections: Radiation Protection and Operations.

  10. High level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 6

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 6) outlines the standards and requirements for the sections on: Environmental Restoration and Waste Management, Research and Development and Experimental Activities, and Nuclear Safety.

  11. Facility effluent monitoring plan for 242-A Evaporator facility. Revision 1

    SciTech Connect (OSTI)

    Crummel, G.M.; Gustavson, R.D.

    1993-03-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1* for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation showed the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility effluent Monitoring Plans, WHC-EP-0438-1**. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements.

  12. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 7. Revision 1

    SciTech Connect (OSTI)

    Burt, D.L.

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 7) presents the standards and requirements for the following sections: Occupational Safety and Health, and Environmental Protection.

  13. APPLICATION OF A THIN FILM EVAPORATOR SYSTEM FOR MANAGEMENT OF LIQUID HIGH-LEVEL WASTES AT HANFORD

    SciTech Connect (OSTI)

    TEDESCHI AR; WILSON RA

    2010-01-14

    A modular, transportable evaporator system, using thin film evaporative technology, is planned for deployment at the Hanford radioactive waste storage tank complex. This technology, herein referred to as a wiped film evaporator (WFE), will be located at grade level above an underground storage tank to receive pumped liquids, concentrate the liquid stream from 1.1 specific gravity to approximately 1.4 and then return the concentrated solution back into the tank. Water is removed by evaporation at an internal heated drum surface exposed to high vacuum. The condensed water stream will be shipped to the site effluent treatment facility for final disposal. This operation provides significant risk mitigation to failure of the aging 242-A Evaporator facility; the only operating evaporative system at Hanford maximizing waste storage. This technology is being implemented through a development and deployment project by the tank farm operating contractor, Washington River Protection Solutions (WRPS), for the Office of River Protection/Department of Energy (ORP/DOE), through Columbia Energy & Environmental Services, Inc. (Columbia Energy). The project will finalize technology maturity and install a system at one of the double-shell tank farms. This paper discusses results of pre-project pilot-scale testing by Columbia Energy and ongoing technology maturation development scope through fiscal year 2012, including planned additional pilot-scale and full-scale simulant testing and operation with actual radioactive tank waste.

  14. 242-A Evaporator/plutonium uranium extraction (PUREX) effluent treatment facility (ETF) nonradioactive air emission test report

    SciTech Connect (OSTI)

    Hill, J.S., Westinghouse Hanford

    1996-05-10

    This report shows the methods used to test the stack gas outlet concentration and emission rate of Volatile Organic Compounds as Total Non-Methane Hydrocarbons in parts per million by volume,grams per dry standard cubic meter, and grams per minute from the PUREX ETF stream number G6 on the Hanford Site. Test results are shown in Appendix B.1.

  15. Laboratory Evaporation Testing Of Hanford Waste Treatment Plant Low Activity Waste Off-Gas Condensate Simulant

    SciTech Connect (OSTI)

    Adamson, Duane J.; Nash, Charles A.; McCabe, Daniel J.; Crawford, Charles L.; Wilmarth, William R.

    2014-01-27

    The Hanford Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) vitrification facility will generate an aqueous condensate recycle stream, LAW Off-Gas Condensate, from the off-gas system. The baseline plan for disposition of this stream is to send it to the WTP Pretreatment Facility, where it will be blended with LAW, concentrated by evaporation and recycled to the LAW vitrification facility again. Alternate disposition of this stream would eliminate recycling of problematic components, and would enable de-coupled operation of the LAW melter and the Pretreatment Facilities. Eliminating this stream from recycling within WTP would also decrease the LAW vitrification mission duration and quantity of canistered glass waste forms. This LAW Off-Gas Condensate stream contains components that are volatile at melter temperatures and are problematic for the glass waste form. Because this stream recycles within WTP, these components accumulate in the Condensate stream, exacerbating their impact on the number of LAW glass containers that must be produced. Approximately 32% of the sodium in Supplemental LAW comes from glass formers used to make the extra glass to dilute the halides to be within acceptable concentration ranges in the LAW glass. Diverting the stream reduces the halides in the recycled Condensate and is a key outcome of this work. Additionally, under possible scenarios where the LAW vitrification facility commences operation prior to the WTP Pretreatment facility, identifying a disposition path becomes vitally important. This task examines the impact of potential future disposition of this stream in the Hanford tank farms, and investigates auxiliary evaporation to enable another disposition path. Unless an auxiliary evaporator is used, returning the stream to the tank farms would require evaporation in the 242-A evaporator. This stream is expected to be unusual because it will be very high in corrosive species that are volatile in the melter

  16. PILOT-SCALE TEST RESULTS OF A THIN FILM EVAPORATOR SYSTEM FOR MANAGEMENT OF LIQUID HIGH-LEVEL WASTES AT THE HANFORD SITE WASHINGTON USA -11364

    SciTech Connect (OSTI)

    CORBETT JE; TEDESCH AR; WILSON RA; BECK TH; LARKIN J

    2011-02-14

    A modular, transportable evaporator system, using thin film evaporative technology, is planned for deployment at the Hanford radioactive waste storage tank complex. This technology, herein referred to as a wiped film evaporator (WFE), will be located at grade level above an underground storage tank to receive pumped liquids, concentrate the liquid stream from 1.1 specific gravity to approximately 1.4 and then return the concentrated solution back into the tank. Water is removed by evaporation at an internal heated drum surface exposed to high vacuum. The condensed water stream will be shipped to the site effluent treatment facility for final disposal. This operation provides significant risk mitigation to failure of the aging 242-A Evaporator facility; the only operating evaporative system at Hanford maximizing waste storage. This technology is being implemented through a development and deployment project by the tank farm operating contractor, Washington River Protection Solutions (WRPS), for the Office of River Protection/Department of Energy (ORPIDOE), through Columbia Energy and Environmental Services, Inc. (Columbia Energy). The project will finalize technology maturity and install a system at one of the double-shell tank farms. This paper summarizes results of a pilot-scale test program conducted during calendar year 2010 as part of the ongoing technology maturation development scope for the WFE.

  17. Environmental Restoration Disposal Facility - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Restoration Disposal Facility About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration

  18. U Plant - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Us Projects & Facilities U Plant About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration

  19. B Plant - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plant About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration Disposal Facility F Reactor H Reactor

  20. B Reactor - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reactor About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration Disposal Facility F Reactor H

  1. 100 Area - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    00 Area About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration Disposal Facility F Reactor H

  2. Cold Test Facility - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects & Facilities Cold Test Facility About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental

  3. Volpentest HAMMER Federal Training Center - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects & Facilities Volpentest HAMMER Federal Training Center About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility

  4. Waste Treatment & Immobilization Plant - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Treatment & Immobilization Plant Office of River Protection About ORP ORP Projects & Facilities Tank Farms Waste Treatment & Immobilization Plant 242-A Evaporator 222-S Laboratory Newsroom Contracts & Procurements Contact ORP Waste Treatment & Immobilization Plant Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Waste Treatment Plant Overview Waste Treatment and Immobilization Plant Background Information The Hanford Site, located in

  5. Waste Treatment & Immobilization Plant Project - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Treatment Plant About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration Disposal Facility F Reactor

  6. Canister Storage Building and Interim Storage Area - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Canister Storage Building and Interim Storage Area About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental

  7. Bench-Scale Evaporation of a Large Hanford Envelope C Sample (Tank 241-AN-102)

    SciTech Connect (OSTI)

    Crowder, M.L.

    2001-07-13

    This report contains the results of the Bench Scale evaporation of a large sample of pretreated Envelope C (AN102).

  8. FULL SCALE TESTING TECHNOLOGY MATURATION OF A THIN FILM EVAPORATOR FOR HIGH-LEVEL LIQUID WASTE MANAGEMENT AT HANFORD - 12125

    SciTech Connect (OSTI)

    TEDESCHI AR; CORBETT JE; WILSON RA; LARKIN J

    2012-01-26

    Simulant testing of a full-scale thin-film evaporator system was conducted in 2011 for technology development at the Hanford tank farms. Test results met objectives of water removal rate, effluent quality, and operational evaluation. Dilute tank waste simulant, representing a typical double-shell tank supernatant liquid layer, was concentrated from a 1.1 specific gravity to approximately 1.5 using a 4.6 m{sup 2} (50 ft{sup 2}) heated transfer area Rototherm{reg_sign} evaporator from Artisan Industries. The condensed evaporator vapor stream was collected and sampled validating efficient separation of the water. An overall decontamination factor of 1.2E+06 was achieved demonstrating excellent retention of key radioactive species within the concentrated liquid stream. The evaporator system was supported by a modular steam supply, chiller, and control computer systems which would be typically implemented at the tank farms. Operation of these support systems demonstrated successful integration while identifying areas for efficiency improvement. Overall testing effort increased the maturation of this technology to support final deployment design and continued project implementation.

  9. 242-A Control System device logic software documentation. Revision 2

    SciTech Connect (OSTI)

    Berger, J.F.

    1995-05-19

    A Distributive Process Control system was purchased by Project B-534. This computer-based control system, called the Monitor and Control System (MCS), was installed in the 242-A Evaporator located in the 200 East Area. The purpose of the MCS is to monitor and control the Evaporator and Monitor a number of alarms and other signals from various Tank Farm facilities. Applications software for the MCS was developed by the Waste Treatment System Engineering Group of Westinghouse. This document describes the Device Logic for this system.

  10. ORP Projects & Facilities - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facilities Office of River Protection About ORP ORP Projects & Facilities Tank Farms Waste Treatment & Immobilization Plant 222-S Laboratory 242-A Evaporator Newsroom Contracts &...

  11. Radiological dose assessment for the decontaminated concrete removed from 183-H solar evaporation basins at the Hanford site, Richland, Washington

    SciTech Connect (OSTI)

    Kamboj, S.; Faillace, E.; Yu, C.

    1997-01-01

    Potential maximum radiation dose rates over a 1,000-year time horizon were calculated for exposure to the decontaminated concrete removed from the 183-H Solar Evaporation Basins at the Hanford Site, Richland, Washington. The RESRAD computer code, Version 5.62, which implements the methodology described in the US Department of Energy`s manual for developing residual radioactive material guidelines, was used in this evaluation. Currently, the concrete is not being used. Four potential exposure scenarios were developed for the land area where the decontaminated concrete will be stored. In Scenario A industrial use of the land is assumed; in Scenario B recreational use of the land is assumed; in Scenario C residential use of the land is assumed; and in Scenario D (a plausible but unlikely land-use scenario), the presence of a subsistence farmer in the immediate vicinity of the land is assumed. For Scenarios A and B, water used for drinking is assumed to be surface water from the Columbia River; for Scenarios C and D, groundwater drawn from a well located at the downgradient edge of the storage area is the only source of water for drinking, irrigation, and raising livestock. Conservative parameters values were used to estimate the radiation doses. The results of the evaluation indicate that the US Department of Energy`s dose limit of 100 mrem/yr would not be exceeded for any of the scenarios analyzed. The potential maximum dose rates for Scenarios A, B, C, and D are 0.75, 0.022, 29, 29 mrem/yr, respectively. An uncertainty analysis was performed to determine which parameters have the greatest impact on the estimated doses. The doses in Scenarios C and D were found to be very sensitive to the magnitude of the irrigation rate.

  12. Sequence and batch language programs and alarm related C Programs for the 242-A MCS

    SciTech Connect (OSTI)

    Berger, J.F.

    1996-04-15

    A Distributive Process Control system was purchased by Project B-534, 242-A Evaporator/Crystallizer Upgrades. This control system, called the Monitor and Control system (MCS), was installed in the 242-A evaporator located in the 200 East Area. The purpose of the MCS is to monitor and control the Evaporator and monitor a number of alarms and other signals from various Tank Farm facilities. Applications software for the MCS was developed by the Waste Treatment Systems Engineering (WTSE) group of Westinghouse. The standard displays and alarm scheme provide for control and monitoring, but do not directly indicate the signal location or depict the overall process. To do this, WTSE developed a second alarm scheme.

  13. 241-A evaporator flowsheet users manual

    SciTech Connect (OSTI)

    Larrick, A.P.

    1994-12-22

    This supporting document presents a description of the 242-A Evaporator flowsheet. Material balances are calculated for feed, slurry, and effluent streams based on input data for the feed stream.

  14. Hanford Video - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Traffic Safety Video Title: Hanford Traffic Safety Video Keywords: Hanford, Traffic, Safety, Video Date: 01 February 2011 Description: Hanford Traffic Safety Video <-- Related Videos: -->

  15. Hanford Speakers Bureau - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bureau Hanford Speakers Bureau Hanford Speakers Bureau Hanford Speakers Bureau Request Form Hanford Speakers Bureau Frequently Asked Questions Why Hanford? Video Hanford Speakers...

  16. Hanford Cultural Resources - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Us Hanford Site Wide Programs Hanford's Tribal Program Hanford Cultural Resources About Us Hanford's Tribal Program Home Hanford Cultural Resources DOE American Indian Tribal...

  17. Hanford Lifecycle Reports - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Lifecycle Reports Hanford Lifecycle Reports Hanford Lifecycle Reports Hanford Lifecycle Reports Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size 2016 Hanford Lifecycle Report 2015 Hanford Lifecycle Report 2014 Hanford Lifecycle Report 2013 Hanford Lifecycle Report 2012 Hanford Lifecycle Report 2011 Hanford Lifecycle Report Share on Last Updated 02/22/2016 2:54

  18. Sequence and batch language programs and alarm-related ``C`` programs for the 242-A MCS. Revision 2

    SciTech Connect (OSTI)

    Berger, J.F.

    1995-03-01

    A Distributive Process Control system was purchased by Project B-534, ``242-A Evaporator/Crystallizer Upgrades``. This control system, called the Monitor and Control System (MCS), was installed in the 242-A Evaporator located in the 200 East Area. The purpose of the MCS is to monitor and control the Evaporator and monitor a number of alarms and other signals from various Tank Farm facilities. Applications software for the MCS was developed by the Waste Treatment Systems Engineering (WTSE) group of Westinghouse. The standard displays and alarm scheme provide for control and monitoring, but do not directly indicate the signal location or depict the overall process. To do this, WTSE developed a second alarm scheme which uses special programs, annunciator keys, and process graphics. The special programs are written in two languages; Sequence and Batch Language (SABL), and ``C`` language. The WTSE-developed alarm scheme works as described below: SABL relates signals and alarms to the annunciator keys, called SKID keys. When an alarm occurs, a SABL program causes a SKID key to flash, and if the alarm is of yellow or white priority then a ``C`` program turns on an audible horn (the D/3 system uses a different audible horn for the red priority alarms). The horn and flashing key draws the attention of the operator.

  19. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to Hanford. March 20, 2013 Firefighters at the Hanford Site Participate in Annual Leukemia & Lymphoma Society Event Firefighters from the Hanford Site recently raised...

  20. Photo Gallery - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility

  1. Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Children 03080006-052df Baseball Team, Hanford, 1913 03080006-052df Baseball Team, Hanford, 1913 092263-4 Hanford Grade School Students and Teacher, 1934 092263-4 Hanford Grade...

  2. High level waste storage tanks 242-A evaporator standards/requirement identification document

    SciTech Connect (OSTI)

    Biebesheimer, E.

    1996-01-01

    This document, the Standards/Requirements Identification Document (S/RIDS) for the subject facility, represents the necessary and sufficient requirements to provide an adequate level of protection of the worker, public health and safety, and the environment. It lists those source documents from which requirements were extracted, and those requirements documents considered, but from which no requirements where taken. Documents considered as source documents included State and Federal Regulations, DOE Orders, and DOE Standards

  3. High level waste storage tanks 242-A evaporator S/RID phase II assessment report

    SciTech Connect (OSTI)

    Biebesheimer, E.

    1996-09-27

    This document, the Standards/Requirements Identification Document (S/RID) Phase 2 Assessment Report for the subject facility, represents the results of a Performance Assessment to determine whether procedures containing S/RID requirements are fully implemented by field personnel in the field. It contains a summary report and three attachments; an assessment schedule, performance objectives, and assessments for selected functional areas.

  4. Hanford Staff Directory - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Illness Compensation Hanford Workers Compensation Projects & Facilities HERO PHOENIX Hanford Meteorological Station Definitions Abbreviations and Acronyms Visitor Control...

  5. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 2007 August 16, 2007 2006 Marked By Substantial Hanford Cleanup Progress 2006 Marked By Substantial Hanford Cleanup Progress

  6. Hanford CBDPP Committee - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford CBDPP Committee Beryllium FAQs Beryllium Related Links Hanford Beryllium Awareness Group (BAG) Program Performance Assessments Beryllium Program Feedback Beryllium...

  7. Hanford Dangerous Waste Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    * Removes water and volatile organics from tank waste. * Decreases the volume of water to create room in double-shell tanks, allowing them to accept waste from noncompliant single- shell tanks. * Treats up to 1 million gallons to free up about 500,000 gallons in the double-shell tanks in each campaign. * Near PUREX and most of the double-shell tanks in the 200 East Area. * Began operating in 1977. Where does the waste come from? Waste comes to the 242-A Evaporator from the double-shell tanks.

  8. Introduction to Tc/I in Hanford Flowsheet

    Office of Environmental Management (EM)

    Introduction to TcI in Hanford Flowsheet Gary Smith Office of Waste Processing (EM-31) November 18, 2010 2 Rough Flowsheet Diagram Tank Farm Evaporator Pretreatment Evaporator IDF ...

  9. Washington Closure Hanford: Cleanup Progress Along Hanford's...

    Broader source: Energy.gov (indexed) [DOE]

    Sax, President, Washington Closure Hanford. Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor More Documents & Publications 2014 Congressional Nuclear...

  10. Contact Hanford Fire Department - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department Contact Hanford Fire Department Hanford Fire Department Hanford Fire Department Home About Hanford Fire Department Fire and Life Safety Information Hot Links to Cool...

  11. Hanford Site Wide Programs - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Page | Print Print Page |Text Increase Font Size Decrease Font Size Hanford Site-Wide Programs Hanford Safety and Health Hanford Site Wide Programs Hanford Fire Department...

  12. Hanford Meteorological Station - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Meteorological Station Hanford Meteorological Station Real Time Met Data from Around the ... The HMS provides a range of Hanford Site weather forecast products, real-time ...

  13. Washington Closure Hanford - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Contracting ORP Contracts and Procurements RL Contracts and Procurements CH2M HILL Plateau Remediation Company Mission Support Alliance Washington Closure Hanford HPM...

  14. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 2011 June 07, 2011 PRESS RELEASE: Hanford Projects Receive Sustainability Awards Hanford's Department of Energy offices and their contractors received special recognition for...

  15. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 2013 April 22, 2013 Green Initiatives Keep Hanford Site Environmentally Responsible Hanford has made great strides in making sure cleanup work is performed as environmentally...

  16. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 2015 July 13, 2015 Hanford Cleanup Progress Fact Sheet DOE fact sheet includes latest statistics on Hanford Site cleanup progress through May 2015

  17. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 17, 2013 PHOTO GALLERY: Tokyo Electric Power Company Visits Hanford Officials learn about Hanford cleanup technologies for use at Fukushima January 16, 2013 STATEMENT: ...

  18. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    preparations December 13, 2011 PRESS RELEASE: Hanford Waste Treatment Plant completes concrete design for largest facility The Hanford Waste Treatment Plant Project recently issued...

  19. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 2014 January 28, 2014 FACT SHEET: Hanford Site Cleanup Progress This fact sheet has been updated with statistics on Hanford Site cleanup progress through the end of December 2013. January 22, 2014 Massive Hanford Test Reactor Removed Plutonium Recycle Test Reactor removed from Hanford's 300 Area

  20. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 2016 April 25, 2016 Hanford Cleanup Progress Fact Sheet April 2016 The updated Hanford Site progress fact sheet April 05, 2016 Additional Hanford Cleanup Tours Announced Due to popular demand, the U.S. Department of Energy (DOE) has announced 10 additional Hanford cleanup tours for the 2016 season. The announcement comes after the initially scheduled 15 tours filled up quickly

  1. Hanford Speakers Bureau - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Speakers Bureau Hanford Speakers Bureau Hanford Speakers Bureau Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size To request a Hanford Speakers Bureau presentation for your meeting or event, simply complete and submit this form. The Hanford Speakers Bureau can also perform remote presentations by use of SKYPE or GoToMeeting. Skype allows users to communicate with peers via video conferencing over the Internet. Video conference calls to other users within

  2. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 2016 March 31, 2016 Manhattan Project National Historical Park at Hanford Expands 2016 Tour Season RICHLAND, Wash. - In partnership with the National Park Service (NPS), the U.S. Department of Energy (DOE) will open registration for the Manhattan Project National Historical Park's 2016 public tour season at the Hanford, Wash., sites on Monday, Apr March 28, 2016 Hanford Cleanup Progress Fact Sheet March 2016 The updated Hanford Site progress fact sheet March 21, 2016 Hanford Cleanup Tour

  3. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 2016 June 30, 2016 Hanford Cleanup Progress Fact Sheet June 2016 The updated Hanford Site progress fact sheet through June 30, 2016. June 29, 2016 Washington Closure Hanford reaches a new safety milestone - 7 million safe work hours Washington Closure Hanford (WCH) and its subcontractor employees have achieved a significant safety milestone by working 7 million hours without a lost workday injury. June 01, 2016 Registration for Additional Hanford Site Cleanup Tours Begin on June 1 Due to

  4. Press Releases - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Newsroom Press Releases Newsroom Press Releases Media Contacts Photo Gallery The Hanford Story Hanford Blog Hanford YouTube Channel

  5. Hanford Video - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tags Search Search Popular Keywords: B Reactor CHPRC Chu Cleanup Cold War Cold War Patriots Day DOE office of river protection ERDF Fire Hanford ORP Press Conference Recovery Richland Safety Steven Chu Video WCH demolition department of energy environmental explosive management nuclear projects stack tank farms technology training waste

  6. Outreach - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tribal Program Hanford Advisory Board Hanford Site Tours Hanford Speakers Bureau FOIA Reading Room Hanford For Students Administrative Record (AR) Outreach Email Email Page |...

  7. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Newsroom Hanford Blog Newsroom Press Releases Media Contacts Photo Gallery The Hanford Story Hanford Blog Hanford YouTube Channel Hanford Blog Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size July 2016 July 20, 2016 DOE Marks 20 Years of Cleanup Success at ERDF This month marks 20 successful years of environmental cleanup at one of the U.S. Department of Energy (DOE)'s largest disposal facilities. June 2016 June 30, 2016 Hanford Cleanup Progress Fact Sheet June

  8. Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Cleanup Tours Hanford Site Cleanup Tours Tour Registration Required Forms of ID Tour Information Tour Route Find Confirmation Seat Notification Frequently Asked Questions Media Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size This website will not function with Javascript disabled Tour Information Hanford Site Cleanup Tours Hanford Site Cleanup Tours for the public are planned on the following dates: May 3, 11, 17, 24 and 25 June 1, 7, 15, 21, 28, and

  9. Hanford Fun Facts - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... There used to be places on the mountains surrounding Hanford where missiles and anti-aircraft guns were manned by soldiers, in case anyone ever tried to attack Hanford Because ...

  10. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 2013 October 31, 2013 FACT SHEET: Hanford Site Cleanup Progress This fact sheet has been updated with statistics on Hanford Site cleanup progress through the end of September 2013.

  11. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 2015 July 13, 2015 Hanford Cleanup Progress Fact Sheet - May 2015 This is a DOE fact sheet with the latest statistics on Hanford Site cleanup progress through the end of May 2015

  12. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 2016 April 05, 2016 Additional Hanford Cleanup Tours Announced Due to popular demand, the U.S. Department of Energy (DOE) has announced 10 additional Hanford cleanup tours for the 2016 season

  13. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 2016 June 29, 2016 Washington Closure Hanford reaches a new safety milestone Washington Closure Hanford (WCH) and its subcontractor employees have achieved a significant safety milestone by working 7 million hours without a lost workday injury

  14. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 26, 2011 PRESS RELEASE: Recovery Act Funds Expand Groundwater Treatment at Hanford Site Workers at the Hanford Site have surpassed goals for drilling wells to detect and remove ...

  15. Recap and Conclusions to Tc/I in Hanford Flowsheet Presentations

    Office of Environmental Management (EM)

    Recap & Conclusions to TcI in Hanford Flowsheet Presentations Gary Smith Office of Waste Processing (EM-31) November 18, 2010 2 Rough Flowsheet Diagram Tank Farm Evaporator ...

  16. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 2009 October 30, 2009 Backgrounder on Reporting Hanford Job Creation Recovery Act job creation figures for the Hanford Site that are posted on recovery.gov and www.hanford.gov/recovery are different. They are counting different things. This backgrounder explains the different ways jobs creation is being tracked and reported. October 29, 2009 Vit Plant's Pretreatment Facility Expands Interior Installations The Pretreatment (PT) Facility at the Hanford Waste Treatment and Immobilization

  17. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 2009 September 30, 2009 Hanford Workers Resume Cleanup of 200 North Area of the Hanford Site Hanford Workers Resume Cleanup of 200 North Area of the Hanford Site September 30, 2009 Photos of 200 North area building demolition Photos of 200 North area building demolition September 28, 2009 Cleanup of Soil Under K East Basin Begins Contractor CH2M HILL Plateau Remediation Company has begun cleaning up soil underneath the former location of the K East Basin, near the Columbia River.

  18. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 2010 January 27, 2010 Radioactive Liquid Waste Retrieved from Hanford's 12th Single-Shell Tank Washington River Protection Solutions has started retrieving waste from another of Hanford's aging single-shell tanks, making it the 12th such tank to undergo waste retrieval. Click to view the full press release. January 15, 2010 Recovery Act Jobs Count Changes at Hanford The Hanford Site has implemented new guidance from the Department of Energy's Office of Environmental Management (EM) on

  19. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 2010 July 30, 2010 Hanford Vitrification Plant Project begins complicated cooling panel installations Earlier this month, crews at the Hanford Vitrification Plant began a series of complicated cooling panel installations in the Low-Activity Waste Vitrification (LAW) Facility. July 27, 2010 Update on Recovery Act Spending and Work at Hanford A fact sheet showing Recovery Act funding spent to date and a list of major Hanford projects that have been funded and completed has been updated. July

  20. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 2012 April 25, 2012 PRESS RELEASE: DOE Announces Intent to Extend Hanford Site Contract Five-Year Extension Planned for Cleanup Contractor CH2M Hill Plateau Remediation Company April 18, 2012 PRESS RELEASE: Sixth Chapter of Hanford Story Released to Public Chapter Covers History and Cleanup of Most Hazardous Facility at Hanford April 17, 2012 FACT SHEET: Plutonium Finishing Plant Vault Complex Demolition Complete One of Hanford's highest security facilities April 12, 2012 FACT SHEET:

  1. Hanford Meteorological Station - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office (69.08 KB) More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA, Idaho National

  2. Hanford Site Tours - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tours Hanford Site Tours Hanford Tour Restrictions Hanford Site Tours Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The Hanford Site is a very unique place offering a number of tours for members of the public, elected officials and their staffs, tribal officials, stakeholders, and others. A list of the kinds of Hanford tours we provide is shown below, along with links to register for the tour or a contact person to call for more information on how to sign up.

  3. The Hanford Story - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Hanford Story The Hanford Story The Hanford Story The Hanford Story Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size "A lot of the people come here with a lot of questions, and a lot of people come here with some concerns." Rich Buel, Department of Energy This quote by Rich Buel, a Department of Energy employee, summarizes a common public view of the Hanford site in southeastern Washington State. Many in the Pacific Northwest region are aware the

  4. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 2014 July 31, 2014 FACT SHEET: Hanford Cleanup Progress Fact Sheet Check the latest stats on Hanford cleanup progress and employment at the site. July 31, 2014 Washington Closure Hanford reaches 4 million safe hours For the second time since beginning work on the River Corridor Closure Project in 2005 July 02, 2014 NEWS RELEASE: Workers Prepare to Enter One of Hanford's Most Hazardous Rooms When workers enter the hazardous and historic McCluskey Room at the Hanford Site this summer, they

  5. Hanford.gov Site Maintenance - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Email Email Page | Print Print Page | Text Increase Font Size ...

  6. Hanford Speakers Bureau Presentations FY2014 - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Hanford Speakers Bureau Hanford Speakers Bureau Request Form Hanford Speakers Bureau Frequently Asked Questions Why Hanford? Video Hanford Speakers Bureau Presentations FY2015...

  7. The Hanford Story | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Hanford Story The Hanford Story Addthis Description Washington Closure Hanford depicting The Hanford Story

  8. Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Board River and Plateau (RAP) Meeting Public Involvement Meetings Hanford Advisory Board Health, Safety, and Environmental Protection (HSEP) Committee Meeting Public Involvement...

  9. EA-1682: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Upgrades and Life Extension of the 242-A Evaporator, Hanford Site, Richland, Washington, Conducted under the American Recovery and Reinvestment Act of 2009

  10. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 2009 May 12, 2009 DOE Issues Notice to Proceed to Mission Support Contractor Today, the Department of Energy Richland Operations Office issued a Notice to Proceed to Mission Support Alliance, LLC, and the contractor is now authorized to begin mission support work at the Hanford Site. May 08, 2009 First 400 Hired with Recovery Act Funding at Hanford Four hundred employees hired using American Recovery and Reinvestment Act funding are reporting to work at the Hanford Site and receiving

  11. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 2010 October 29, 2010 PHOTO GALLERY: See photos of Hanford workers demolishing more than six football fields worth of concrete at K West 380,000 square feet of concrete structures demolished October 29, 2010 PRESS RELEASE: TPA Agencies Sign On For Major Changes Governing Hanford's Central Plateau Agencies Agree To Integration of Soil, Facility, and Groundwater Cleanup Milestones at Hanford October 28, 2010 Contractor Recovery Act Update This newsletter is published by CH2M HILL Plateau

  12. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 2013 December 16, 2013 DOE Exercises Option for Mission Support Contract The Department of Energy is extending Mission Support Alliance's contract for infrastructure and site services at the Hanford Site in southeastern Washington state by three years. December 13, 2013 DOE Announces Record of Decision on Hanford Tank Closure and Waste Management December 05, 2013 Washington Closure Hanford Reaches $1 billion in Small Business Subcontracting $783 million goes to businesses in Washington

  13. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 2014 April 22, 2014 FACT SHEET: Cleanup Progress at Hanford Check the metrics on Hanford Site cleanup since 1989 in this fact sheet that is updated periodically (this version: March 2014). April 22, 2014 VIDEO: Managing Safety Equipment at Hanford Through teamwork and sharing of information, Plutonium Finishing Plant industrial hygiene employees increase safety for all plant employees. April 18, 2014 Department of Energy Responds to Washington State's Proposal to Amend the Consent Decree

  14. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 2015 September 28, 2015 Workers Treat Record Amount of Hanford Groundwater Workers at the U.S. Department of Energy's (DOE) Hanford Site treated a record amount of groundwater to remove contamination in the last year, operating facilities that treated 2.1 billion gallons of groundwater. August 2015 August 25, 2015 Workers Remove Iconic Glove Boxes from Hanford&apos;s Historic McCluskey Room Workers recently finished removing three pieces of history from one of the most hazardous

  15. Hanford Workers Compensation - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at the Hanford Site, the Department of Energy (DOE) wants to hear from you. Our mission is to improve communication among DOE, DOE's third party administrator, Penser...

  16. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    has posted on its website a report on its independent inspection of the Hanford Site Chronic Beryllium Disease Prevention Program (Released June 2, 2010) June 02, 2010 Inspection...

  17. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 2010 May 27, 2010 Recovery Act Progress at Hanford Read the full report on ARRA progress (through 3/31) at the Hanford Site. May 25, 2010 Cleaning Up After The Cold War: Hanford's Tank Waste In a recent article for the Daily Kos, former Hanford radiochemist Page van der Linden explains the complexity and importance of tank waste retrieval and processing. May 24, 2010 Department of Energy Strengthens Management of the Waste Treatment Plant in Washington State U.S. Energy Secretary Steven Chu

  18. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 2010 September 28, 2010 PHOTO GALLERY: See progress to construct the 200 West pump and treat system at Hanford. Steel is on the rise at the construction site of the 200 West Groundwater Treatment System. Check out these photos of a 100-ton crane hoisting the first structural steel for what will become Hanford's largest pump-and-treat system to date. September 27, 2010 Hanford Firefighters Bring 2010 Fire Season To A Close This year, Hanford firefighters fought 31 fires that burned a

  19. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 2011 February 28, 2011 PRESS RELEASE: TPA Agencies To Hold "State of the Site" Meetings Richland, Seattle, and Portland Dates Set To Discuss Hanford Cleanup February 24, 2011 PRESS RELEASE: Online Registration Dates Set for 2011 Hanford Tours Numerous Tours of both the Hanford Site and the B Reactor Continue in 2011 February 23, 2011 PRESS RELEASE: Major Recovery Act Project Completed at Hanford -- Super Cells 9 and 10 Two New Super Cells Go Into Service To Accept Contaminated

  20. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 2014 May 29, 2014 FACT SHEET: Workers' Compensation Overview of the program for compensating Hanford Site workers for injuries on the job. May 23, 2014 FACT SHEET: Hanford Cleanup Progress Fact Sheet Check the stats on Hanford cleanup and read about where we are in the decades-long effort to remediate the Hanford Site. May 15, 2014 VIDEO: Boosting Treatment Capacity at Pump and Treat Facility Upgrades at 200 West Pump and Treat Facility will allow DOE and CH2M HILL to treat more contaminated

  1. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 2011 July 29, 2011 VIDEO: Hanford Tank Farms Core Drilling Demonstration Tank Farms workers demonstrate core drilling capabilities for single-shell tanks July 29, 2011 VIDEO: ...

  2. Hanford Fire Department - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The other services provided to Hanford Site contractors include functional testing and preventive and corrective maintenance of installed, automatic life safety fire detection and ...

  3. Hanford For Students and Kids - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford For Students and Kids Hanford For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Hanford For Students and Kids Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The Hanford Nuclear Reservation is a pretty amazing place. Located in the present-day southeast corner of Washington State, the area where Hanford sits has a history that actually began thousands of years ago when wild animals roamed free and Indians were the only

  4. Hanford Natural Resource Trustee Council - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Council About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Hanford Cultural Resources Hanford Natural Resource Trustee Council HNRTC Members HNRTC History & Accomplishments Contact Us Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The Hanford Natural Resource Trustee Council is a collaborative working group chartered to address natural resources impacted by Hanford Site releases of hazardous substances. The objectives of the NRTC are:

  5. Hanford Workers Compensation Flow - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Wide Programs Hanford Workers Compensation Hanford Workers Compensation Flow About Us Hanford Cultural Resources Hanford Workers Compensation PENSER Representatives Hanford Workers Compensation Flow Compensation Claim Process Presentations Related Information Vocational Rehabilitation Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Hanford Worker's Compensation Flow - Printable Version (PDF) WC_Flowchart Share on Last Updated 02/14/2016 4:51

  6. High-level waste storage tank farms/242-A evaporator standards/requirements identification document (S/RID), Vol. 2

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    The Quality Assurance Functional Area Requirements Identification Document (RID), addresses the programmatic requirements that ensure risks and environmental impacts are minimized, ensure safety, reliability, and performance are maximized through the application of effective management systems commensurate with the risks posed by the Tank Farm Facility and its operation. This RID incorporates guidance intended to provide Tank Farms management with the necessary requirements information to develop, upgrade, or assess the effectiveness of a Quality Assurance Program in the performance of organizational and functional activities. Quality Assurance is defined as all those planned and systematic actions necessary to provide adequate confidence that a facility, structure, system, or component will perform satisfactorily and safely in service. This document will provide the specific requirements to meet DNFSB recommendations and the guidance provided in DOE Order 5700.6C, utilizing industry codes, standards, regulatory guidelines, and industry good practices that have proven to be essential elements for an effective and efficient Quality Assurance Program as the nuclear industry has matured over the last thirty years.

  7. High-level waste storage tank farms/242-A evaporator standards/requirements identification document (S/RID), Vol. 7

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    This Requirements Identification Document (RID) describes an Occupational Health and Safety Program as defined through the Relevant DOE Orders, regulations, industry codes/standards, industry guidance documents and, as appropriate, good industry practice. The definition of an Occupational Health and Safety Program as specified by this document is intended to address Defense Nuclear Facilities Safety Board Recommendations 90-2 and 91-1, which call for the strengthening of DOE complex activities through the identification and application of relevant standards which supplement or exceed requirements mandated by DOE Orders. This RID applies to the activities, personnel, structures, systems, components, and programs involved in maintaining the facility and executing the mission of the High-Level Waste Storage Tank Farms.

  8. High level waste storage tank farms/242-A evaporator standards/requirements identification document phase 1 assessment report

    SciTech Connect (OSTI)

    Biebesheimer, E., Westinghouse Hanford Co.

    1996-09-30

    This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Report for the subject facility, represents the results of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. It contains; compliance status, remedial actions, and an implementing manuals report linking S/RID elements to requirement source to implementing manual and section.

  9. High-level waste storage tank farms/242-A evaporator standards/requirements identification document (S/RID), Vol. 1

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    The purpose of this Requirements Identification Document (RID) section is to identify, in one location, all of the facility specific requirements and good industry practices which are necessary or important to establish an effective Issues Management Program for the Tank Farm Facility. The Management Systems Functional Area includes the site management commitment to environmental safety and health (ES&H) policies and controls, to compliance management, to development and management of policy and procedures, to occurrence reporting and corrective actions, resource and issue management, and to the self-assessment process.

  10. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 2012 February 16, 2012 PRESS RELEASE: Fourth Chapter of Hanford Story Released to Public The "Tank Waste Cleanup" focuses on the work conducted by the Office of River Protection to retrieve, treat and ultimately dispose of the 56 million gallons of Hanford's tank waste

  11. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 2015 December 29, 2015 The Department of Energy's Office of Environmental Management Update Newsletter Spotlights River Corridor Cleanup at Hanford Site EM marks the many accomplishments the Richland Operations Office and its contractors have achieved in cleanup along the Columbia River corridor at the Hanford Site

  12. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 2016 February 25, 2016 Workers Remove Most Contaminated Processing Equipment from Hanford Plutonium Finishing Plant Workers have finished cutting up and removing the two most highly contaminated pieces of processing equipment, called glove boxes, from the Plutonium Finishing Plant at the Hanford Site in Washington state

  13. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 2015 May 07, 2015 Washington State University to Manage Hanford's Manhattan Project and Cold War-era Artifacts and Archives The U.S. Department of Energy's Richland Operations Office (RL), through site contractor Mission Support Alliance (MSA), has begun a new partnership with Washington State University Tri-Cities that will provide expert care of Hanford Site artifacts

  14. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 2015 August 25, 2015 Workers Remove Iconic Glove Boxes from Hanford&apos;s Historic McCluskey Room Workers recently finished removing three pieces of history from one of the most hazardous rooms at the Hanford Site in Washington State

  15. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 2016 February 25, 2016 Workers Remove Most Contaminated Processing Equipment from Hanford Plutonium Finishing Plant Workers have finished cutting up and removing the two most highly contaminated pieces of processing equipment, called glove boxes, from the Plutonium Finishing Plant at the Hanford Site in Washington state

  16. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 2016 May 30, 2016 Registration for Additional Hanford Site Cleanup Tours Begin on June 1 Due to popularity of the Hanford Site cleanup tour, registration for 10 additional tours will begin at 9 a.m. on Tuesday, June 1

  17. Hanford Beryllium Awareness Group (BAG) - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Wide Programs Beryllium Program Hanford Beryllium Awareness Group (BAG) About Us Hanford Cultural Resources Beryllium Program Beryllium Program Points of Contact Beryllium Facilities & Areas Beryllium Program Information Hanford CBDPP Committee Beryllium FAQs Beryllium Related Links Hanford Beryllium Awareness Group (BAG) Program Performance Assessments Beryllium Program Feedback Beryllium Health Advocates Primary Contractors/Employers Medical Testing and Surveillance Facilities

  18. Hanford Site Voluntary Protection Program - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Voluntary Protection Program Hanford Site Voluntary Protection Program Hanford Site Voluntary Protection Program VPP Home VPP Hanford Site Champions Committee Getting Started Maintaining STAR VPP Communications VPP Conferences Hanford Site Voluntary Protection Program Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size 2013 VPPPA Outreach Award Winners VPP Committee Business Case (PDF)

  19. Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of 06934566 .l\ ~ ~ ~~9 u.s. Department of Energy Hanford Site OEC 2 8 2004 04-0RP-O78 Mr. Todd Martin, Chair Hanford Advisory Board 1933 Jadwin Avenue, Suite 135 Rich1and, Washington 99352 Dear Mr. Martin: HANFORD ADVISORY BOARD (HAB) CONSENSUS ADVICE #167 -STOP WORK AUTHORITY Reference: HAB letter from T. Martin to P. Golan and J. Shaw, DOE-HQ; K. Klein, RL; R. Schepens, ORP; L. Hoffman, Ecology; and R. Kreizeneeck, EPA, "Stop Work Authority," dated November 5, 2004. This letter

  20. HAB Hanford Advisory Board

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HAB Hanford Advisory Board Annual Report 2014 On the cover: Demolition at Hanford's 300 Area. Hanford Advisory Board 2014 The Hanford Advisory Board would like to acknowledge the following resources used for the content of the Board's Annual Report: * Washington State Department of Ecology website (www.ecy.wa.gov/programs/nwp/index.html) * U.S. Department of Energy Hanford Site website (www.hanford.gov) * Hanford Facebook page (www.facebook.com/HanfordSite) * Tri-Party Agreement agency

  1. Department of Energy's Tribal Program - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford's Tribal Program About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Hanford's Tribal Program Home Hanford Cultural Resources DOE American Indian...

  2. Hanford News

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    been moved away from several areas near the Columbia River at the Hanford Site. Thu, 19 Nov 2015 09:00:36 GMT Agencies welcome Manhattan Project National Historical Park http:...

  3. Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Did You Know Did You Know Calendar Hanford Blog Archive Search Site Feeds Site Index Weather What's New Did You Know Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Close Did you know.... Close

  4. Hanford ARRA News - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Recovery Act of 2009 Hanford ARRA News Recovery Act of 2009 Hanford ARRA News Hanford ARRA News Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size 2010 July 26, 2010 K East Reactor Stack Taken Down (PDF) DOE and contractor CH2M HILL Plateau Remediation Company used Recovery Act funding to take down the stack of the K East Reactor using explosives on July 23, 2010. July 21, 2010 Helicopter Removes Aging Truck From Steep Rattlesnake Ravine (PDF) A Sikorsky S-64

  5. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 2013 July 19, 2013 ORP Update on Status of Double Shell Tank AY-102 July 16, 2013 VIDEO: 300 Area Proposed Plan Overview The 300 Area, just north of Richland, Washington, was where fuel for Hanford's nine plutonium production reactors was manufactured. July 15, 2013 NEWS RELEASE: Hanford Site Treating Record Amount of Groundwater Contractor CH2M HILL met annual goal for treating 1.4 billion gallons 3 months early and removed 36 tons of contaminants. July 09, 2013 Hanford Landfill Reaches 15

  6. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 2014 February 27, 2014 Registration Starts Soon for Hanford's Two Annual Public Tour Programs The U.S. Department of Energy (DOE) will open online registration for both of its public tour programs in early March. The Hanford Site public tours focus on environmental cleanup while the B Reactor tours focus on Hanford's role in the top secret Manhattan Project during World War II. February 14, 2014 1,153-ton Waste Vault Removed from 300 Area Vault held waste tanks with contamination from

  7. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 2016 March 31, 2016 Manhattan Project National Historical Park at Hanford Expands 2016 Tour Season In partnership with the National Park Service (NPS), the U.S. Department of Energy (DOE) will open registration for the Manhattan Project National Historical Park's 2016 public tour season at the Hanford, Wash., sites on Monday, April 4, at 8:00 a.m. March 21, 2016 Hanford Cleanup Tour Registration Begins in April The U.S. Department of Energy (DOE) will open online registration for the 2016

  8. Hanford Site Safety Standards - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Safety Standards Documents Documents Hanford Site Cleanup Completion Framework Tri-Party Agreement Freedom of Information and Privacy Act Hanford Site Budget Hanford Site Safety Standards Hanford Hoisting and Rigging Manual DOE - ORP Contracts/Procurements DOE - RL Contracts/Procurements Integrated Waste Feed Delivery Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RI/FS 100-D/H Operable Units RI/FS Sitewide Probabilistic Seismic Hazard Analysis Environmental Hanford Site

  9. Hanford Sitewide Probabilistic Seismic Hazard Analysis - Hanford...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sitewide Probabilistic Seismic Hazard Analysis Documents Documents Hanford Site Cleanup Completion Framework Tri-Party Agreement Freedom of Information and Privacy Act Hanford Site...

  10. Hanford Employee Recreation Organization - HERO - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Employee Recreation Organization - HERO Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Travel The Hanford Employee Recreation Organization ...

  11. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 2009 February 18, 2009 Briefing on Cleanup to Washington State Legislature Representatives of the two DOE field offices briefed Washington State legislators in Olympia on cleanup progress at the Hanford Site

  12. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    dedicated at Hanford March 17, 2011 GRAPHIC: Turnover of WTP facilities to operations, color-coded by year. March 04, 2011 VIDEO: Explosive demolition takes down two 250-foot tall...

  13. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 28, 2011 PHOTO GALLERY: Demolition of a Coal-Fired Power House (284W) Contractor ... September 09, 2011 PRESS RELEASE: Hanford Waste Treatment Plant receives and sets key ...

  14. Hanford Advisory Board - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Board Hanford Advisory Board Convening Report SSAB Guidance Memorandum of Understanding Membership Nomination and Appointment Process Operating Ground Rules Calendars Advice and Responses Full Board Meeting Information Committee Meeting Information Outgoing Board Correspondence Key Board Products and Special Reports HAB Annual Report HAB and Committee Lists Points of Contact Related Links Hanford Advisory Board Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size

  15. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 2015 December 29, 2015 The Department of Energy's Office of Environmental Management Update Newsletter Spotlights River Corridor Cleanup at Hanford Site EM marks the many accomplishments the Richland Operations Office and its contractors have achieved in cleanup along the Columbia River corridor at the Hanford Site. November 2015 November 19, 2015 Department of Energy completes chromium cleanup along Columbia River More than two million tons of chromium-contaminated soil have been moved

  16. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 2007 February 05, 2007 U.S. Secretary of Energy Samuel W. Bodman announced President Bush's $24.3 billion budget request for the DOE for FY08. U.S. Secretary of Energy Samuel W. Bodman announced President Bush's $24.3 billion budget request for the DOE for FY08. February 05, 2007 Hanford Cleanup Progress Video - "A Few Good Things" - Available Hanford Cleanup Progress Video - "A Few Good Things" - Available

  17. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 2009 November 24, 2009 MSNBC Story on Impact of Recovery Act Funding MSNBC recently posted an article on its website comparing how communities in Benton County, Wash., and Elkhart, Ind., are faring with Recovery Act funding going to projects in those communities, including environmental cleanup work at the Hanford Site. November 23, 2009 Vit Plant's 50-percent complete mark celebration video In October, 2009, the Hanford Waste Treatment and Immobilization Plant (WTP) Project celebrated

  18. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 2009 December 31, 2009 Highlights of 2009 Accomplishments: Richland Operations Office The DOE Richland Operations Office and its contractors at the Hanford Site made tremendous progress in several key cleanup categories in 2009. December 28, 2009 Photos of visit to Plutonium Finishing Plant Officials, Hanford Site employees, the media, and visitors celebrated a major accomplishment at the Plutonium Finishing Plant. Recently, workers finished moving all plutonium and reactor fuel

  19. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 2009 March 26, 2009 DOE Solicits Proposals for Workers' Compensation Administration Contract The DOE Richland Operations Office is soliciting contract proposals from companies interested in being the "third party administrator" of Hanford employee workers' compensation claims. March 18, 2009 Potential Work Scope for Recovery Funding Managers of DOE's Office of River Protection and Richland Operations Office briefed tribes and the Hanford Advisory board on potential projects that

  20. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 2009 August 25, 2009 Mission Support Alliance begins operations at Hanford The Department of Energy's mission support contractor began operations Monday, August 24 to provide essential services to the DOE and Hanford contractors to support environmental cleanup efforts. August 25, 2009 Photos of Transition to New Mission Support Contractor The Mission Support Alliance (MSA) assumed responsibility on August 24, 2009 for providing site-wide services to the Department of Energy and its

  1. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 2010 November 26, 2010 PHOTO GALLERY: Josiah Pinkham, a cultural resource specialist with the Nez Perce tells Hanford managers about his culture. The training was part of the Richland Operations office efforts to improve cultural resource and tribal training for federal employees at Hanford. November 26, 2010 PHOTO GALLERY: American Indian Heritage Month speaker Virginia Beavert talks about teaching her native Sahaptin language. Beavert visited the Richland Operations Office to inform

  2. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 2010 December 22, 2010 Hanford Waste Treatment Plant receives last pieces of equipment for quality control system The Waste Treatment Plant (WTP) recently received the last and most significant pieces of its autosampling system for the Low-Activity Waste (LAW) Facility. The system will ensure the glass produced by the Vit Plant meets all regulatory standards and requirements. December 21, 2010 Workers cut hole in Hanford's tank C-107 to improve waste retrieval Over the weekend

  3. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 2010 April 28, 2010 Contractor Recovery Act Update: April 23, 2010 DOE Contractor CH2M HILL Plateau Remediation Company produces a weekly newsletter with information on environmental cleanup projects funded by the Recovery Act. April 26, 2010 Completion of 300 Area Waste Sites Meets TPA Milestone DOE met a Tri-Party Agreement milestone by completing cleanup work on 11 different waste sites at Hanford's 300 Area just north of Richland, Wash. April 23, 2010 Hanford Site to Activate Emergency

  4. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 2011 October 31, 2011 VIDEO: Reusing Piping Saves Taxpayers $50,000 The Department of Energy and its contractors are on a constant hunt for innovations and practices to improve the way work is done to clean up the Hanford Site. This month, CH2M HILL Plateau Remediation Company's soil and groundwater team answered the call. October 27, 2011 PRESS RELEASE: Hanford Waste Treatment Plant receives decontamination vessels for High-Level Waste Facility The Waste Treatment Plant received two

  5. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 2011 November 23, 2011 PRESS RELEASE: Hanford Waste Treatment Plant receives and sets key air-filtration equipment for Low-Activity Waste Facility Last week, the Hanford Waste Treatment Plant received and placed a key piece of air-filtration equipment in the Low- Activity Waste Facility. The nearly 100-ton carbon bed adsorber is part of a complex air-filtration system that will ensure the facility's air emissions meet strict environmental regulations and requirements. November 18, 2011

  6. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 2011 June 30, 2011 UPDATE: Hanford Tank Waste Recovery Report Washington River Protection Solutions Tank Waste Recovery Act Report (June 2011) June 30, 2011 PRESS RELEASE: Construction continues to advance at Pretreatment Facility Hanford Waste Treatment Plant crews lifted and placed a nearly nine-ton rebar curtain above the 77-foot elevation at the Pretreatment Facility. The curtain measures 36 feet long, 22 feet high and is the last curtain to compose the facility's fifth concrete

  7. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 2012 January 30, 2012 PRESS RELEASE: Chief Joseph Middle School to Host Speaker from Hanford January 31 Cameron Salony, DOE, to speak to more than 200 students about the history and cleanup of the Hanford Site and demonstrate protective equipment. January 30, 2012 PHOTO GALLERY: DOE Gives Mission Support Alliance Top Safety Award Ceremony held on January 27, 2012 January 27, 2012 DOE Gives Mission Support Alliance Top Safety Award Contractor's mission support services receive top marks

  8. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 2012 June 20, 2012 NEWS RELEASE: New Chapter of Hanford Story Released "River Corridor" provides viewers with a look at the cleanup of hundreds of contaminated buildings and more than one thousand areas where soil was contaminated along the 50-mile stretch of the Columbia River that flows through the Hanford Site. June 19, 2012 Mobile Arm Retrieval System (MARS) named DOE EM's Project of the Month June 19, 2012 FACT SHEET: Shuffling Highly Radioactive Capsules Workers recently

  9. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 2012 September 19, 2012 PHOTO GALLERY: F Reactor Media Event Pictures of the F Reactor Area and the Media Availability held on September 19, 2012. September 19, 2012 F Reactor Area Cleanup Complete First at Hanford to Finish Buildings, Waste Sites, and Cocooning September 17, 2012 VIDEO: C-104 Retrieval Completion September 17, 2012 Retrieval of the Tenth Single-Shell Tank Complete at Hanford Washington River Protection Solutions (WRPS) has advised the U.S. Department of Energy (DOE)

  10. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 2014 October 30, 2014 Hanford Tank Vapor Assessment Report The Department of Energy remains committed to protecting workers, members of the public and the environment. October 28, 2014 DOE, Washington Closure complete recycling project at Hanford About $400,000 saved by recycling electrical substation components in 300 Area October 22, 2014 Workers Enter Cocooned F Reactor for Scheduled Inspection Inspection by DOE ensures reactors are safe, secure

  11. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 2014 August 12, 2014 NEWS RELEASE: Contractor Removes More Than 650 Pounds of Contamination from Groundwater For a second year in a row, and four months ahead of schedule, CH2M HILL Plateau Remediation Company exceeded the Department of Energy's annual goal. August 11, 2014 NEWS RELEASE: Workers Creating Demolition Zone at Hanford's Plutonium Finishing Plant Over the last few weeks, the look of Hanford's main plutonium plant has changed as crews have removed or demolished eight buildings

  12. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 2015 March 31, 2015 Operation of Effluent Treatment Facility transitioning to Washington River Protection Solutions Click to view the full news release. March 19, 2015 DOE-NNSA, Washington to take part in regional exercise in Benton and Franklin Counties Training designed to enable responders to work together effectively during radiological emergencies March 16, 2015 Hanford Landfill Reaches 17 Million Tons Disposed Waste disposal measures tremendous cleanup progress along Hanford's River

  13. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 2015 May 21, 2015 Briefing to Homebuilders' Association of Tri-Cities Richland Operations Office Manager Stacy Charboneau provided an overview of the Hanford Site to the Homebuilders' Association of the Tri-Cities in May 2015. May 07, 2015 Washington State University to manage Hanford's Manhattan Project and Cold War-era artifacts and archives The U.S. Department of Energy's Richland Operations Office (RL), through site contractor Mission Support Alliance (MSA), has begun a new partnership

  14. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 2015 September 29, 2015 DOE-Richland contractors, programs earn safety honors All three major contractors of the Department of Energy's Richland Operations Office (DOE-RL) and one individual employee were recently recognized with DOE and national safety awards by the Voluntary Protection Program Participants September 29, 2015 Workers treat record amount of Hanford groundwater Workers at the U.S. Department of Energy's (DOE) Hanford Site treated a record amount of groundwater to remove

  15. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 2015 September 29, 2015 DOE-Richland Contractors, Programs Earn Safety Honors All three major contractors of the Department of Energy's Richland Operations Office (DOE-RL) and one individual employee were recently recognized with DOE and national safety awards. September 28, 2015 Workers Treat Record Amount of Hanford Groundwater Workers at the U.S. Department of Energy's (DOE) Hanford Site treated a record amount of groundwater to remove contamination in the last year, operating

  16. Retrieval Activities - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Farms Retrieval Activities Office of River Protection Tank Farms Retrieval Activities PHOENIX - Tank Monitoring Waste Treatment & Immobilization Plant 222-S Laboratory 242-A...

  17. Tank Farms - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    River Protection About ORP ORP Projects & Facilities Tank Farms Retrieval Activities PHOENIX - Tank Monitoring Waste Treatment & Immobilization Plant 222-S Laboratory 242-A...

  18. Land Management - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Land Management About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Hanford Cultural Resources Contact Us Land Management Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Hanford Site - Hanford Reach The U.S. Department of Energy (DOE) Richland Operations Office (RL) is responsible for the management of Hanford Site property. RL has issued the Mission Support Contract (MSC) to provide direct support to RL, DOE Office River Protection (ORP)

  19. Visitor Hanford Computer Access Request - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Visitor Hanford Computer Access Request Visitor Hanford Computer Access Request Visitor Hanford Computer Access Request Visitor Hanford Computer Access Request Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The U.S. Department of Energy (DOE), Richland Operations Office (RL), in compliance with the 'Tri-Party Agreement Databases, Access Mechanism and Procedures' document, DOE/RL-93-69, Revision 5; set forth the requirements for access to the Hanford Site

  20. VPP Hanford Site Champions Committee - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Champions Committee Hanford Site Voluntary Protection Program VPP Home VPP Hanford Site Champions Committee Who We Are Annual Reports Assessments Getting Started Maintaining STAR VPP Communications VPP Conferences VPP Hanford Site Champions Committee Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size VPP Hanford Site Champions Committee VPP Committee VPP Champions Committee Charter (PDF) Business Case (PDF) VPP Champions Committee Roster (PDF) Share on

  1. Hanford Story: Groundwater - Questions - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Hanford Story Hanford Story: Groundwater - Questions The Hanford Story Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size How did contamination get into the groundwater beneath the Hanford Site? What has caused the level of contamination to decrease over the years? What is the 2015 vision for Hanford? What is the goal of the water treatment systems and facilities? What is being done to treat groundwater to remove contamination? Is contaminated groundwater

  2. Hanford Advisory Board Hanford Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New Occupational Medicine Contract Presented to the HAB-HSEP by Darius Slade, Health Systems Specialist DOE-RL-AMMS-ISI D010813-2 Hanford's New Occupational Medicine Contract Agenda  Who is the new Medical Contractor?  What services are offered?  Are there any changes in the new contract that may be different from the previous contract?  Questions? D010813-3 Hanford's New Occupational Medicine Contract Who is the New Contractor?  HPM Corporation (HPMC)  The sub-contractor

  3. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 2009 June 23, 2009 Excavating Hanford's K East Basin New photos of excavation of K East Basin Contractor CH2M HILL Plateau Remediation Company is excavating the K East Basin and is down to the floor of the basin itself (about 20 feet below the surface). June 18, 2009 AP story on Hanford's Waste Treatment Plant This Associated Press story ran on a number of national media outlets today, highlighting the work effort at the Office of River Protection and the Waste Treatment Plant. The article

  4. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 2011 August 31, 2011 VIDEO: Transfer line work nears completion at Hanford's SY Tank Farm Work is finishing up on eight waste transfer lines in Hanford's SY Tank Farm. Roughly 765 linear feet of pipe have been replaced which carry waste from underground storage tanks in 200 West to the new Waste Treatment Plant (WTP). August 29, 2011 News Coverage: B Reactor legislation being written Rep. Doc Hastings said at an event at the B Reactor that he is planning to introduce legislation to create

  5. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 2012 December 20, 2012 DOE Awards Hanford Site Law Enforcement Contract to Benton County The U.S. Department of Energy (DOE) today awarded a contract to the Benton County Sheriff's Office in Kennewick, Wash., to provide law enforcement services at the DOE Hanford Site. The contract has a five-year period of performance, consisting of a one-year base period, with four one-year option periods and an approximate total value of $5 million. December 18, 2012 Office of River Protection

  6. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 2012 July 25, 2012 Vit Plant employees work 12 million hours without a day-away-from-work injury Employees working on the Hanford Waste Treatment Plant have worked more than 12 million hours without a day away from work due to an injury. July 16 marked two years since the last injury involving a day away from work. July 13, 2012 PRESS RELEASE: First of Hanford's Highly Radioactive Sludge Moved Away from River Workers have started moving highly radioactive material, called sludge, away from

  7. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 2013 May 30, 2013 PHOTOS: U.S. Senator Patty Murray Visits Hanford Facility Senator Patty Murray visited the Hanford Site on May 30, 2013. One of the stops on her tour was the 200 West Pump and Treat System. May 13, 2013 Press Release: Workers Exceed Goal for Removing Groundwater Contamination Contractor CH2M HILL Platea Remediation Company has removed more than 500 pounds of hexavalent chromium from groundwater along the Columbia River six months ahead of schedule. May 09, 2013 PHOTOS:

  8. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 2014 September 29, 2014 Settlement on AY-102 ORP and WRPS are pleased that negotiations with Washington State have resulted in a safe and mutually agreed-upon path forward for the removal of waste from Hanford double-shell tank AY-102. September 29, 2014 Message from the Acting Manager on the B Reactor anniversary Tomorrow marks the 70th anniversary of perhaps the most important event in the history of the Hanford Site. September 11, 2014 Study on the Waste Treatment and Immobilization

  9. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 2015 April 22, 2015 New public tour to focus on Hanford historic sites The history of Hanford Site lands prior to the Manhattan Project will be the focus of a new public tour program offered by the U.S. Department of Energy's Richland Operations Office. The program will run from May to October of 2015 and will include April 20, 2015 Last of pencil tank assemblies removed from Plutonium Finishing Plant More than 50 pencil tank assemblies - some two stories tall - contaminated with chemical

  10. Hanford Speakers Bureau Presentations FY2015 - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bureau Hanford Speakers Bureau Presentations FY2015 Hanford Speakers Bureau Hanford Speakers Bureau Request Form Hanford Speakers Bureau Frequently Asked Questions Why Hanford? Video Hanford Speakers Bureau Presentations FY2015 Hanford Speakers Bureau Presentations FY2014 Hanford Speakers Bureau Presentations FY2013 Hanford Site Tours Hanford Speakers Bureau Presentations FY2015 Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size FY 2015 Presentations Milton

  11. T Plant - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    T Plant About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact ... and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage ...

  12. C Reactor - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C Reactor About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs ... 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and ...

  13. N Reactor - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects & Facilities N Reactor About Us About Hanford Cleanup Hanford History Hanford ... 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and ...

  14. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 2012 October 25, 2012 One of the Largest Pieces of Processing Equipment removed from Plutonium Finishing Plant The successful removal of one of the largest, most complex pieces of equipment from the Plutonium Finishing Plant (PFP) October 22, 2012 Hanford Determines Double-Shell Tank Leaked Waste From Inner Tank Testing found no indication of leaks outside the outer tank

  15. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 2014 March 31, 2014 Department of Energy Releases Proposal to Amend the Hanford Consent Decree March 07, 2014 AY-102 Pumping Plan March 07, 2014 Update on Double-Shell Tank AY-102 Information Provided to the Office of River Protection

  16. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 2016 July 20, 2016 DOE Marks 20 Years of Cleanup Success at ERDF This month marks 20 successful years of environmental cleanup at one of the U.S. Department of Energy (DOE)'s largest disposal facilities--the Environmental Restoration Disposal Facility (ERDF) on the Hanford Site in southeastern Washington state

  17. Helpful Links - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Helpful Links Helpful Links Helpful Links Hanford Staff Directory Hanford Site Wide Programs Energy Employees Occupational Illness Compensation Hanford Workers Compensation Projects & Facilities HERO PHOENIX Hanford Meteorological Station Definitions Abbreviations and Acronyms Visitor Control and Site Access Visitor Hanford Computer Access Request Helpful Links Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Contact Us Do you have a question? Contact Hanford

  18. Newsroom - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Newsroom Newsroom Newsroom Press Releases Media Contacts Photo Gallery The Hanford Story Hanford Blog Hanford YouTube Channel Newsroom Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Hanford Newsroom The environmental cleanup work taking place at the Hanford Nuclear Reservation represents one of America's most challenging, technologically advanced projects. Accurate reporting of the cleanup work at Hanford is critical to ensuring that citizens, stakeholders,

  19. Site Index - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Index Site Index Calendar Hanford Blog Archive Search Site Feeds Site Index Weather What's New Site Index Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size About Us About Hanford Cleanup Regulators, Boards, Councils Hanford Advisory Board Hanford Natural Resource Trustee Council Environmental Protection Agency Washington State Department of Ecology Defense Nuclear Facilities Safety Board Hanford History Hanford Site Wide Programs DOE Human Resources Management

  20. Hanford Story: Future - Questions - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Hanford Story Hanford Story: Future - Questions The Hanford Story Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size What possibilities do you see for future uses of the Hanford Site? What potential uses do the community surrounding Hanford envision for areas of land on the site? Why is land on the Hanford Site important to the local tribes? How much of the site is potentially available for future uses? What were some of the potential uses mentioned in the

  1. Hanford Story: Overview - Questions - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Overview - Questions The Hanford Story Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size What word did you use to describe Hanford before you watched the movie? After? Why is Hanford cleanup important to the local tribes? What role did Hanford play in the Manhattan Project? Why was Hanford selected for this? Why is Hanford considered a "city within its own right?" Why is B Reactor an important part of world history? Why did plutonium production continue

  2. Hanford Site Hazards Guide

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Hazards Guide 2016 Approved for Public Release; Further Dissemination Unlimited Hanford Site Hazards Guide Contents ASBESTOS .............................................................................................................................................. 2 BERYLLIUM ........................................................................................................................................... 4 CHEMICAL SAFETY

  3. Glenn Seaborg - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Albert Einstein Enrico Fermi Leslie Groves Franklin Matthias Gilbert Church Crawford...

  4. Hanford | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford Tank Waste Treatment and Immobilization Plant | December 2009 Aerial View The Hanford Site mission focuses on environmental restoration, waste management, related ...

  5. Fluor Hanford Project Focused Progress at Hanford

    SciTech Connect (OSTI)

    HANSON, R.D.

    2000-02-01

    Fluor Hanford is making significant progress in accelerating cleanup at the Hanford site. This progress consistently aligns with a new strategic vision established by the U.S. Department of Energy's Richland Operations Office (RL).

  6. Hanford Natural Resource Trustees - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Members About Us Hanford Cultural Resources Hanford Natural Resource Trustee Council HNRTC Members HNRTC History & Accomplishments Hanford Natural Resource Trustees Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size US Department of Energy - www.hanford.gov Primary Representative: Tom Post - (509) 376-3232 Alternate Representative: Janis Ward - (509) 376-2495 Fish and Wildlife Service - www.fws.gov Primary Representative: Tammy Ash - 509.893.8033 Alternate

  7. Hanford Safety Traffic Improvements - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Us Hanford Site Wide Programs Hanford Safety Traffic Improvements About Us Traffic Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The Department of Energy's Richland Operations Office and Office of River Protection are taking steps to improve traffic safety on the Hanford Site. These measures are meant to improve the safety of the workforce and visitors to the Hanford Site. There will also be benefits in improving the flow of traffic and reducing traffic

  8. Becoming a new Hanford Customer - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Process Becoming a new Hanford Customer About Us Hanford Site Solid Waste Acceptance Program What's New Acceptance Criteria Acceptance Process Becoming a new Hanford Customer Annual Waste Forecast and Funding Arrangements Waste Stream Approval Waste Shipment Approval Waste Receipt Quality Assurance Program Waste Specification Records Tools Points of Contact Becoming a new Hanford Customer Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The DOE Headquarters, and

  9. Hanford Traffic Safety FAQs - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Traffic Safety Frequently Asked Questions Hanford Site Traffic Safety Improvements Hanford Traffic Safety Frequently Asked Questions Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Hanford Traffic Safety Frequently Asked Questions (FAQs) Hanford Site Traffic Safety Committee (HSTSC) Transportation Solutions Inc. (TSI) What are the Safety Pull Outs and what are they used for? The shoulder of Route 4 South is too narrow for drivers to safely pull over. The safety

  10. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 2009 July 23, 2009 DOE, Ecology, EPA Announce New Groundwater Treatment System Dr. Inés Triay, DOE Assistant Secretary for Environmental Management, along with representatives of Washington State, U.S. EPA and the AFL-CIO Metal Trades announced today that construction of the largest treatment system for contaminated groundwater July 16, 2009 Great story on Hanford's vit plant progress in Wednesday's Tri-City Herald Crews recently installed a major component needed for operations at the

  11. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 2011 January 20, 2011 New Groundwater Facility Begins Operations The Department of Energy is boosting its capacity for treating groundwater to remove chromium near the Columbia River by 40 percent with the recent completion of a new treatment facility. January 13, 2011 Hanford Waste Treatment Plant sets massive protective shield door in Pretreatment Facility Earlier this week, a 102-ton protective shield door was set in the Pretreatment Facility at the Waste Treatment Plant. The door was

  12. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 2011 April 28, 2011 PRESS RELEASE: Construction completed on water treatment building for Hanford Waste Treatment Plant Crews finished construction on an essential building that will house equipment to filter and treat water once the plant is operational. April 26, 2011 PHOTO GALLERY: See photos of N Reactor being sealed up as part of the cocooning process. Workers put a roof on the N Reactor's main building and perform waste site remediation close to the Columbia River. April 08, 2011

  13. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 2012 March 29, 2012 DOE Contractor Completes Massive Excavation Washington Closure disposes 650,000 tons of contaminated soil from the C-7 waste site March 09, 2012 DOE Lowers Age Limit for B Reactor Tours Families, schools invited to visit National Historic Landmark March 09, 2012 FACT SHEET: Removing Pencil Tanks Contractor CH2M HILL Plateau Remediation Company is removing plutonium processing equipment from the highest-hazard facility at Hanford. March 08, 2012 PRESS RELEASE: Fifth

  14. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 2012 May 22, 2012 PRESS RELEASE: Hanford Waste Treatment Plant Receives and Sets Six-Ton Exhausters for Air-Filtration System The six-ton exhausters are key components in a complex air-filtration system that will ensure the facility's air emissions meet strict environmental regulations and requirements. May 17, 2012 PRESS RELEASE: CH2M HILL Awards $10.8 Million Subcontract to Local, Small Business Contract awarded to Federal Engineers & Constructors to modify facility that will support

  15. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 2013 February 27, 2013 PHOTO GALLERY: 300 Area North Cleaned Up 98 Facilities Demolished, 58 Waste Sites Remediated February 27, 2013 300 Area North Section Cleaned Up 98 Facilities Demolished; 58 Waste Sites Remediated February 26, 2013 B Reactor Tour Registration Opens March 2 Families with children above the age of 12, along with middle schools and high schools, are invited to sign up for the coveted tour slots. February 25, 2013 Registration Starts Soon for 2013 Hanford Site Public

  16. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 2014 June 25, 2014 Updated web resources: Overview of the program for compensating Hanford Site workers for injuries on the job. June 24, 2014 Independent Oversight Follow-up Assessment of Safety Culture at the Waste Treatment & Immobilization Plant - June 2014 June 23, 2014 ORP Statement to Savannah River National Laboratory names Panel Members for Chemical Vapor, Worker Protection Study June 10, 2014 FACT SHEET: ERDF Reaches 16 Million Tons of Contaminated Material Safely Disposed

  17. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 2015 November 19, 2015 Department of Energy completes chromium cleanup along Columbia River More than two million tons of chromium-contaminated soil have been moved away from several areas near the Columbia River at the Hanford Site. November 12, 2015 Agencies welcome Manhattan Project National Historical Park Following the Nov. 10 establishment of the Manhattan Project National Historical Park, the Department of Energy's (DOE) Richland Operations Office has eliminated the age

  18. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 2015 November 19, 2015 Department of Energy completes Chromium Cleanup Along Columbia River More than two million tons of chromium-contaminated soil have been moved away from several areas near the Columbia River at the Hanford Site. November 12, 2015 Agencies welcome Manhattan Project National Historical Park Following the Nov. 10 establishment of the Manhattan Project National Historical Park, the Department of Energy's (DOE) Richland Operations Office has eliminated the age

  19. Weather Photos - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Meteorological Station Weather Photos Hanford Meteorological Station Photo Gallery Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Hanford Meteorological Service Search Search Search Filter: Hanford Meteorological Service All Galleries 284 East Explosive Demolition Settlers B Reactor 100DX Groundwater Treatment Facility 100HX Groundwater Treatment Facility 200 West Groundwater Treatment Facility Construction 200 West Groundwater Treatment LEED Facility

  20. Hanford Story: Recovery Act - Questions - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Hanford Story Hanford Story: Recovery Act - Questions The Hanford Story Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size What did the Department of Energy and its contractors do with nearly $2 billion in stimulus funding? Why was the Department able to put the funding to use quickly? How many jobs were created by stimulus funding received at the Hanford Site? How much of the cleanup footprint of Hanford is left after projects funded by the Recovery Act were

  1. HANFORD SITE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Advisory Board Larry Goldstein November 1, 2012 1 2 Who We Are State of Oregon State of Washington U.S. Department of Energy U.S. Department of Commerce (NOAA) U.S. Department of Interior (Fish and Wildlife Service) Nez Perce Tribe Confederated Tribes and Bands of the Yakama Nation Confederated Tribes of the Umatilla Indian Reservation 3 Trustees are governments, defined by CERCLA, who act to: Protect the public interest and to "make the public whole" for injuries to natural

  2. Hanford Speakers Bureau Presentations FY2013 - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Hanford Speakers Bureau Hanford Speakers Bureau Request Form Hanford Speakers Bureau Frequently Asked Questions Why Hanford? Video Hanford Speakers Bureau Presentations FY2015 Hanford Speakers Bureau Presentations FY2014 Hanford Speakers Bureau Presentations FY2013 Hanford Site Tours Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size 2013 Presentations Group Location Japan Environmental Safety Corporation Richland, WA CREST Museum Richland, WA Richland Kiwanis

  3. Regulators, Boards, Councils - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regulators, Boards, Councils Hanford Advisory Board Hanford Natural Resource Trustee Council Environmental Protection Agency Washington State Department of Ecology Defense...

  4. Beryllium Program Feedback - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford CBDPP Committee Beryllium FAQs Beryllium Related Links Hanford Beryllium Awareness Group (BAG) Program Performance Assessments Beryllium Program Feedback Beryllium...

  5. Hanford Site Cleanup Completion Framework - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RIFS Sitewide Probabilistic Seismic Hazard Analysis Environmental Hanford Site Cleanup Completion Framework Email Email...

  6. The Hanford Story: Groundwater

    Broader source: Energy.gov [DOE]

    This second chapter of The Hanford Story explains how more than 100 square miles of groundwater under the Hanford Site became contaminated and what workers are doing to restore groundwater to its highest beneficial use.

  7. Senator Murray Visits Hanford

    Broader source: Energy.gov [DOE]

    U.S. Sen. Patty Murray (D-Wash.) visited the Hanford site in Washington state recently, where she received an update on activities at C Farm, which is one of the groups of underground waste tanks at Hanford.

  8. H Reactor - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Us Projects & Facilities H Reactor About Us About Hanford Cleanup Hanford History ... 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and ...

  9. F Reactor - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Us Projects & Facilities F Reactor About Us About Hanford Cleanup Hanford History ... 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and ...

  10. Hanford Tank Waste Residuals

    Office of Environmental Management (EM)

    Hanford Tank Waste Residuals DOE HLW Corporate Board November 6, 2008 Chris Kemp, DOE ORP Bill Hewitt, YAHSGS LLC Hanford Tanks & Tank Waste * Single-Shell Tanks (SSTs) - 27 million ...

  11. Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor Presentation from the 2015 DOE National Cleanup Workshop by Scott Sax, President, Washington Closure Hanford. Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor (10.41 MB) More Documents & Publications 2014 Congressional Nuclear Cleanup Caucus Briefings 2013 Congressional Nuclear Cleanup

  12. What's New - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    What's New About Us Hanford Cultural Resources Hanford Site Solid Waste Acceptance Program What's New Acceptance Criteria Acceptance Process Tools Points of Contact What's New Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size February 2011 - Revision 16 of the Hanford Site Solid Waste Acceptance Criteria A Revision of the Hanford Site Solid Waste Acceptance Criteria has been released. The document can be found on the Acceptance Criteria page. Waste packages (55

  13. Franklin Matthias - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Franklin Matthias Hanford For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Albert Einstein Enrico Fermi Leslie Groves Franklin Matthias Gilbert Church Crawford Greenewalt Franklin Delano Roosevelt Harry S. Truman Major Charles W. Sweeney J. Robert Oppenheimer Glenn Seaborg Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The first person who wanted Hanford to be built here was an Army Colonel named Franklin Matthias. Colonel

  14. About Us - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Us About Us About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us About Us Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Cleanup of the Hanford Site is overseen by two Department of Energy Offices, the Richland Operations Office (RL) and the Office of River Protection (ORP). Each office has a staff of about 250 federal employees. The work largely involves contract oversight and safety and compliance-related work. The U.S.

  15. Crawford Greenewalt - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Crawford Greenewalt Hanford For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Albert Einstein Enrico Fermi Leslie Groves Franklin Matthias Gilbert Church Crawford Greenewalt Franklin Delano Roosevelt Harry S. Truman Major Charles W. Sweeney J. Robert Oppenheimer Glenn Seaborg Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Before the big Hanford nuclear reactors could be built, the process for building them had to be tested to

  16. The Hanford Story: Future

    Broader source: Energy.gov [DOE]

    The Future Chapter of the Hanford Story illustrates the potential and possibilities offered by a post-cleanup Hanford. From land use plans and preservation at Hanford to economic development and tourism opportunities, the Future chapter touches on a variety of local economic, cultural and environmental perspectives.

  17. 1997 annual report on waste generation and waste minimization progress as required by DOE Order 5400.1, Hanford Site

    SciTech Connect (OSTI)

    Segall, P.

    1998-04-13

    Hanford`s missions are to safely clean up and manage the site`s legacy wastes, and to develop and deploy science and technology. Through these missions Hanford will contribute to economic diversification of the region. Hanford`s environmental management or cleanup mission is to protect the health and safety of the public, workers, and the environment; control hazardous materials; and utilize the assets (people, infra structure, site) for other missions. Hanford`s science and technology mission is to develop and deploy science and technology in the service of the nation including stewardship of the Hanford Site. Pollution Prevention is a key to the success of these missions by reducing the amount of waste to be managed and identifying/implementing cost effective waste reduction projects. Hanford`s original mission, the production of nuclear materials for the nation`s defense programs, lasted more than 40 years, and like most manufacturing operations, Hanford`s operations generated large quantities of waste and pollution. However, the by-products from Hanford operations pose unique problems like radiation hazards, vast volumes of contaminated water and soil, and many contaminated structures including reactors, chemical plants and evaporation ponds. The cleanup activity is an immense and challenging undertaking, which includes characterization and decommissioning of 149 single shell storage tanks, treating 28 double shell tanks, safely disposing of over 2,100 metric tons of spent nuclear fuel stored on site, removing numerous structures, and dealing with significant solid waste, ground water, and land restoration issues.

  18. Hanford Story: PFP - Questions - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PFP - Questions The Hanford Story Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Why did Hanford produce so much plutonium? How hazardous is the Plutonium Finishing Plant in comparison to other facilities on the Hanford Site? What was the other name for the Plutonium Finishing Plant? Why was security and secrecy required for the plant and its product - plutonium? When did the last of the last shipment of plutonium leave the plant? What is the main focus of work

  19. Hanford Speakers Bureau

    Frequently Asked Questions - Hanford...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the topics covered by the Hanford Speakers Bureau? The presentation covers various strategies for cleaning up the 586 square miles Hanford Site. Speakers can provide an...

  20. Measure Guideline: Evaporative Condensers

    SciTech Connect (OSTI)

    German, A; Dakin, B.; Hoeschele, M.

    2012-03-01

    This measure guideline on evaporative condensers provides information on properly designing, installing, and maintaining evaporative condenser systems as well as understanding the benefits, costs, and tradeoffs. This is a prescriptive approach that outlines selection criteria, design and installation procedures, and operation and maintenance best practices.

  1. High level waste storage tank farms/242-A evaporator standards/requirements identification document phase 1 assessment corrective actions/compliance schedule approval report

    SciTech Connect (OSTI)

    Biebesheimer, E.

    1996-09-30

    This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Corrective Actions/Compliance Schedule Approval Report for the subject facility, contains the corrective actions required to bring the facility into compliance as a result of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. These actions are delineated in the Compliance Schedule Approvals which also contain; noncompliances, risks, compensatory measures, schedules for corrective actions, justifications for approval, and resource impacts.

  2. Washington Closure Hanford, LLC., Hanford, June 2012

    Office of Environmental Management (EM)

    Washington Closure Hanford, LLC Report from the Department of Energy Voluntary Protection Program Onsite Review June 11-14, 2012 U.S. Department of Energy Office of Health, Safety and Security Office of Health and Safety Office of Worker Safety and Health Assistance Washington, DC 20585 Washington Closure Hanford DOE-VPP Onsite Review June 2012 i Foreword The Department of Energy (DOE) recognizes that true excellence can be encouraged and guided, but not standardized. For this reason, on January

  3. Waste Specification Records - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Specification Records About Us Hanford Site Solid Waste Acceptance Program What's New Acceptance Criteria Acceptance Process Becoming a new Hanford Customer Annual Waste Forecast...

  4. Franklin Delano Roosevelt - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Albert Einstein Enrico Fermi Leslie Groves Franklin Matthias Gilbert Church Crawford...

  5. Hanford Advisory Board Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    M-37, M-085, and M-94. Hanford Advisory Board Business The Board approved two letters. ... River Corridor cleanup, PFP decommissioning and demolition, the Hanford Site's ...

  6. Environmental - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Documents Environmental Documents Documents Hanford Site Cleanup Completion Framework Tri-Party Agreement Freedom of Information and Privacy Act Hanford Site Budget Hanford Site Safety Standards DOE - ORP Contracts/Procurements DOE - RL Contracts/Procurements Integrated Waste Feed Delivery Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RI/FS 100-D/H Operable Units RI/FS Sitewide Probabilistic Seismic Hazard Analysis Environmental CERCLA Five-Year Review NEPA - Categorical Exclusions

  7. Getting Started - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Voluntary Protection Program Getting Started Hanford Site Voluntary Protection Program VPP Home VPP Hanford Site Champions Committee Getting Started Maintaining STAR VPP Communications VPP Conferences Getting Started Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size History of VPP (PDF) VPP How To Guide (PDF) VPP Getting Started Tools Employee Pocket Guide (PDF) What is a Personal Safety Action Plan (PDF) Picture This (PDF) VPP Tenets Tenet 1 (PDF)

  8. LTS Execution - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Execution About Us Hanford Cultural Resources LTS Home Page LTS Project Management LTS Transition and Timeline LTS Execution LTS Background LTS Information Management LTS Fact Sheets / Briefings LTS In The News LTS Related Links LTS Contact Us LTS Execution Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The Hanford LTS Program is described in the Hanford LTS Program Plan and includes two distinct elements: Transition process is a disciplined process that is used

  9. Media Contacts - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Media Contacts Newsroom Press Releases Media Contacts Photo Gallery The Hanford Story Hanford Blog Hanford YouTube Channel Media Contacts Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Richland Operations Office Office of River Protection River Corridor cleanup Reactor/facility cleanout and demolition Solid waste burial ground cleanup Groundwater remediation Central Plateau cleanup Waste Treatment (Vitrification) Plant construction Underground tank waste storage

  10. Leslie Groves - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Leslie Groves Hanford For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Albert Einstein Enrico Fermi Leslie Groves Franklin Matthias Gilbert Church Crawford Greenewalt Franklin Delano Roosevelt Harry S. Truman Major Charles W. Sweeney J. Robert Oppenheimer Glenn Seaborg Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Kids in Richland can ride their bikes, play basketball, soccer, or tennis, or walk along the Columbia River in

  11. Photo Gallery - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    People 03080006-052df Baseball Team, Hanford, 1913 03080006-052df Baseball Team, Hanford, 1913 88091335-9 White Bluffs Band, 1932 88091335-9 White Bluffs Band, 1932 86746-15 Two Unidentified Men in Front of a House, 1940 86746-15 Two Unidentified Men in Front of a House, 1940 092263-4 Hanford Grade School Students and Teacher, 1934 092263-4 Hanford Grade School Students and Teacher, 1934 03080006-15df White Bluffs High School Students and Teacher, 1935 03080006-15df White Bluffs High School

  12. Photo Gallery - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    School 2012 Fall Poster - School Zones 2012 Fall Poster - School Zones 86746-21 White Bluffs High School Fire, 1942 86746-21 White Bluffs High School Fire, 1942 092263-4 Hanford Grade School Students and Teacher, 1934 092263-4 Hanford Grade School Students and Teacher, 1934 03080006-15df White Bluffs High School Students and Teacher, 1935 03080006-15df White Bluffs High School Students and Teacher, 1935 74155-15 Hanford High School Students and Teachers, 1933 74155-15 Hanford High School

  13. Documents - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    regarding Hanford's previous mission of plutonium production. Posting every document dating back to 1943 on this website would be unrealistic. However, certain documents are...

  14. Weather - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weather Weather Calendar Hanford Blog Archive Search Site Feeds Site Index Weather What's New Weather Email Email Page | Print Print Page |Text Increase Font Size Decrease Font...

  15. Contracting - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WRPS carries out the work associated with monitoring and managing the 177 underground storage tanks at Hanford. These tanks contain liquid and semi-solid wastes that will...

  16. WRPS Contract - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Services and Interface Requirements Matrix 382 PDF J.4 Performance Evaluation and Measurement Plan (PEMP) 350 PDF J.5 Performance Guarantee Agreement PDF J.6 Small ...

  17. Hanford Advisory Board

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and recommendations to DOE, EPA and Ecology that consider public values in cleanup ... and the Washington State Department of Ecology to complete the Hanford cleanup mission ...

  18. Contact Us - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Wide Programs Health & Safety Exposition Contact Us About Us Booth Awards Special Events Exhibitor Information What is EXPO Electronic Registration Form Contact Us...

  19. Beryllium FAQs - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Hanford Site employee meetings were held May 17, 2010 to discuss beryllium and the Chronic Beryllium Disease Prevention Program (CBDPP). Questions & Answers about Beryllium are...

  20. Search - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Search Search Calendar Hanford Blog Archive Search Site Feeds Site Index Weather What's New Search Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size

  1. Hanford Advisory Board HAB

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Advisory Board HAB Annual Report 2010 Hanford Advisory Board Mission-oriented Policy-focused Diverse Dedicated Robust Inviting Collaborative Hardworking Respectful Creative I n d e p e n d e n t Non-partisan Balanced Involved Communicative Well-informed Pa s s i o n a t e On the cover: Aerial view of the Waste Treatment and Immobilization Plant (WTP) construction site. Hanford Advisory Board 2010 Hanford Advisory Board at a Glance Chair's Message Follow Hanford Cleanup! 2010 Accomplishments In

  2. Hanford Tank Waste Retrieval,

    Office of Environmental Management (EM)

    Tank Waste Retrieval, Treatment, and Disposition Framework September 24, 2013 U.S. Department of Energy Washington, D.C. 20585 Hanford Tank Waste Retrieval, Treatment, and ...

  3. FOIA EDocuments - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Contractors and Subcontractors since 1947 ContractorSubcontractor listing dated December 18, 2008 Prime Contractor of Subcontractors with Employment Records Available ...

  4. Contact Us - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact Us About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us Contact Us Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Contact Us Do you have a question? Contact Hanford DOE Logo Street Address: Federal Bldg: 825 Jadwin Ave., Suite 1 Richland, WA 99352 Map Mailing Address: DOE RL PO Box 550 Richland, WA 99352 Street Address: DOE ORP 2440 Stevens Center Place, H660 Richland, WA, 99354 Mailing Address: DOE ORP PO Box 450

  5. Event Calendar - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Advisory Board Calendars Hanford Events Calendar Hanford Advisory Board Hanford Events Calendar Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size << Previous Year << Previous Month 2016 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec List View | Calendar View| Daily View 2016 Sep 1 60-Day Comment Period: PUREX North Closure Plan July 18 - September 16, 2016 More Info... Proposed Closure Plan for the 324 Building July 5 - September 9 More Info...

  6. Waste Treatment Technology Process Development Plan For Hanford Waste Treatment Plant Low Activity Waste Recycle

    SciTech Connect (OSTI)

    McCabe, Daniel J.; Wilmarth, William R.; Nash, Charles A.

    2013-08-29

    components are mostly sodium and ammonium salts of nitrate, chloride, and fluoride. This stream has not been generated yet, and will not be available until the WTP begins operation, causing uncertainty in its composition, particularly the radionuclide content. This plan will provide an estimate of the likely composition and the basis for it, assess likely treatment technologies, identify potential disposition paths, establish target treatment limits, and recommend the testing needed to show feasibility. Two primary disposition options are proposed for investigation, one is concentration for storage in the tank farms, and the other is treatment prior to disposition in the Effluent Treatment Facility. One of the radionuclides that is volatile and expected to be in high concentration in this LAW Recycle stream is Technetium-99 ({sup 99}Tc), a long-lived radionuclide with a half-life of 210,000 years. Technetium will not be removed from the aqueous waste in the Hanford Waste Treatment and Immobilization Plant (WTP), and will primarily end up immobilized in the LAW glass, which will be disposed in the Integrated Disposal Facility (IDF). Because {sup 99}Tc has a very long half-life and is highly mobile, it is the largest dose contributor to the Performance Assessment (PA) of the IDF. Other radionuclides that are also expected to be in appreciable concentration in the LAW Recycle are {sup 129}I, {sup 90}Sr, {sup 137}Cs, and {sup 241}Am. The concentrations of these radionuclides in this stream will be much lower than in the LAW, but they will still be higher than limits for some of the other disposition pathways currently available. Although the baseline process will recycle this stream to the Pretreatment Facility, if the LAW facility begins operation first, this stream will not have a disposition path internal to WTP. One potential solution is to return the stream to the tank farms where it can be evaporated in the 242-A evaporator, or perhaps deploy an auxiliary evaporator to

  7. Email Template

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE MEETING October 7, 2009 Richland, WA Topics in this Meeting Summary Welcome and Introductions ................................................................................................ 1 242-A Evaporator................................................................................................................ 2 Waste Management Area - C Performance Assessment (PA) ............................................ 6

  8. The Hanford Story: Overview

    Broader source: Energy.gov [DOE]

    This is the Emmy Award-winning first chapter of The Hanford Story, a multimedia presentation that provides an overview of the Hanford Site—its history, today's cleanup activities, and a glimpse into the possibilities of future uses of the 586-square-mile government site in southeast Washington State.

  9. VPP Conferences - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Conferences Hanford Site Voluntary Protection Program VPP Home VPP Hanford Site Champions Committee Getting Started Maintaining STAR VPP Communications VPP Conferences National Presentations Regional Presentations VPP Conferences Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size 2014 Regional and National Conferences Regional Conference Event National Conference Event

  10. Visitor Control / Site Access - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Us Hanford Site Wide Programs Visitor Control / Site Access About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Hanford Cultural Resources Contact Us Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Planning to come to the Hanford Site? Map of Hanford Map of Hanford If you are planning on coming to Hanford as part of a job assignment, tour, or event, you need to be familiar with the requirements and restrictions associated with being on