  1. PP-10-1 Bonneville Power Administrator | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -1 Bonneville Power Administrator PP-10-1 Bonneville Power Administrator Presidential ... at the U.S-Canada border. PDF icon PP-10-1 Bonneville Power Administrator More ...

  2. PP-10 Bonneville Power Administrator | Department of Energy

    Energy Savers [EERE]

    Bonneville Power Administrator PP-10 Bonneville Power Administrator Presidential permit authorizing Bonneville Power Administrator to construct, operate, and maintain electric ...

  3. EERE Success Story-SunShot-funded Advanced Inverter Testing Enables 2,500

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar Energy Systems to Connect to Hawaii's Electric Grid | Department of Energy SunShot-funded Advanced Inverter Testing Enables 2,500 Solar Energy Systems to Connect to Hawaii's Electric Grid EERE Success Story-SunShot-funded Advanced Inverter Testing Enables 2,500 Solar Energy Systems to Connect to Hawaii's Electric Grid January 22, 2015 - 3:45pm Addthis Thanks to a SunShot collaboration at the Energy Department's National Renewable Energy Laboratory (NREL) more than 2,500 Hawaiian

  4. Results from ORNL characterization of ZrO2-500-AK2 - surrogate TRISO material

    SciTech Connect (OSTI)

    Kercher, Andrew K; Hunn, John D

    2005-06-01

    This document is a compilation of the characterization data for the TRISO-coated surrogate particles designated ZrO2-500-AK2 that was produced at Oak Ridge National Laboratory (ORNL) as part of the Advanced Gas Reactor Fuel Development and Qualification (AGR) program. The ZrO2-500-AK2 material contains nominally 500 {micro}m kernels of yttria-stabilized zirconia (YSZ) coated with all TRISO layers (buffer, inner pyrocarbon, silicon carbide, and outer pyrocarbon). The ZrO2-500-AK2 material was created for: (1) irradiation testing in the High Flux Isotope Reactor (HFIR) and (2) limited dissemination to laboratories as deemed appropriate to the AGR program. This material was created midway into a TRISO fuel development program to accommodate a sudden opportunity to perform irradiation testing on surrogate material. While the layer deposition processes were chosen based on the best technical understanding at the time, technical progress at ORNL has led to an evolution in the perceived optimal deposition conditions since the creation of ZrO2-500-AK2. Thus, ZrO2-500-AK2 contains a reasonable TRISO microstructure, but does differ significantly from currently produced TRISO surrogates and fuel at ORNL. In this document, characterization data of the ZrO2-500-AK2 surrogate includes: size, shape, coating thickness, and density.

  5. Type B Accident Investigation Board Report on the July 25, 1997, Contract Brush Cutter Injury on the Ashe-Marion #2 500 kV Line

    Broader source: Energy.gov [DOE]

    On July 25, 1997, at 1205 hours, a contract hand brush cutter was seriously injured when he felled a tree close to a Bonneville Power Administration energized transmission power line, located within a BPA transmission-line corridor.

  6. Geek-Up[3.4.2011]: 3,000+ MW and 2,500 Year-Old Greek Pottery

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration celebrates big windy milestone and researchers SLAC National Accelerator Laboratory study the surfaces of 2,500 year old Greek pottery -- all in this week's Geek-Up.

  7. 500 kV Spare Transformer Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procurement capital project is for the acquisition of five, 500 kV spare transformers, which are to be strategically located throughout the system, and for the...

  8. PP-10_BPA.pdf

    Office of Environmental Management (EM)

  9. B&W Y-12 donates $2,500 to MMC Hospitality House | Y-12 National Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complex MMC Hospitality House Posted: January 27, 2014 - 1:35pm B&W Y-12 donated $2,500 to Oak Ridge Methodist Medical Center's Hospitality House. B&W Y-12 Director of Public Affairs Bill Reis, right, hands a $2,500 donation to Mike Belbeck, Methodist Medical Center's President and Chief Administrative Officer. The funds will go toward MMC's Hospitality Houses, which provide temporary lodging for patients and families who travel to Oak Ridge for extended medical treatment

  10. B&W Y-12 donates $2,500 to local Girl Scouts summer camp program | Y-12

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Security Complex local Girl Scouts summer camp program Posted: June 27, 2013 - 3:39pm OAK RIDGE, Tenn. - Booth Kammann, (center, left in photo) CEO of the Girl Scout Council of the Southern Appalachians, accepts a donation of $2,500 from Nancy Johnson, B&W Y-12's vice president of Business Services and Performance Assurance, which will help fund the summer program at Camp Tanasi, located near Andersonville on Norris Lake. Joining Kammann and Johnson are (from left in photo)

  11. SunShot-funded Advanced Inverter Testing Enables 2,500 Solar Energy Systems to Connect to Hawaiis Electric Grid

    Broader source: Energy.gov [DOE]

    Thanks to a SunShot collaboration at the Energy Departments National Renewable Energy Laboratory (NREL) more than 2,500 Hawaiian Electric customers will connect solar power to the electrical grid...

  12. PP-10-1_BPA.pdf

    Office of Environmental Management (EM)

  13. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of McNary Group 2 - Big Eddy to Knight The Big Eddy - Knight 500 kV line and new substation (WOMR Group 2) project is one of five projects recommended out of the 2008 Cluster...

  14. INTEGRATED 15KV SIC VSD AND HIGH-SPEED MW MOTOR FOR GAS COMPRESSION...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    15KV SIC VSD AND HIGH-SPEED MW MOTOR FOR GAS COMPRESSION SYSTEMS INTEGRATED 15KV SIC VSD AND HIGH-SPEED MW MOTOR FOR GAS COMPRESSION SYSTEMS Eaton Corporation - Arden, NC A 15 ...

  15. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line ...

  16. 0.4 kV remote control (Smart Grid Project) | Open Energy Information

    Open Energy Info (EERE)

    .4 kV remote control (Smart Grid Project) Jump to: navigation, search Project Name 0.4 kV remote control Country Denmark Coordinates 56.26392, 9.501785 Loading map......

  17. 220 kV SSSC device for power flow control (Smart Grid Project...

    Open Energy Info (EERE)

    20 kV SSSC device for power flow control (Smart Grid Project) Jump to: navigation, search Project Name 220 kV SSSC device for power flow control Country Spain Headquarters Location...

  18. ETM (Distribution Network Automation on 10 kV cable line stations...

    Open Energy Info (EERE)

    ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable...

  19. EIS-0344: Grand Coulee-Bell 500 kV Transmission Line

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

  20. Further Notice of 230kV Circuit Planned Outages | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages

  1. Wild Horse 69-kV transmission line environmental assessment

    SciTech Connect (OSTI)

    1996-12-01

    Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.

  2. Notification of Planned 230kV Outage at Potomac River Generating...

    Energy Savers [EERE]

    Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To ... The next planned outage on 23106 high voltage circuit between xxxxxxx xx xxxx and ...

  3. Notification of Planned 230kV Outage at Potomac River Generating...

    Office of Environmental Management (EM)

    Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits ...

  4. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line...

    Energy Savers [EERE]

    BPA's proposed action is to interconnect the proposed transmission line to an existing BPA substation. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project Public ...

  5. Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation

    SciTech Connect (OSTI)

    Ohler, C.K.

    1991-05-21

    The 69 KV Substation Project is based on the recognized need to provide a continuous, reliable source of power and to improve the firm capacity of the electrical service to all production facilities at Mound. The project consists of the following major element: 69 KV Substation: (1) Install a 69 KV Substation and associated equipment with two parallel 18 MVA transformers. (2) Install duct bank as required and provide 15 KV feeder cable from new substation to existing Substation 95 for connection to Mound`s existing primary distribution system. (3) Install duct bank for underground routing of the 15 KV feeder cable from Manhole 5C to the existing power house cable pit. (4) Reconfigure existing Dayton Power and Light Co. 15 KV switchgear in P Building. The purpose of this Quality Assurance Plan (QA Plan) is to assure that the objectives of the United States Department of Energy (D.O.E.) and EG&G Mound Applied Technologies, Miamisburg, Ohio (Mound) are met for this non-weapons project relative to health and safety, protection of the environment, reliability and continuity of operations, and documentation of quality efforts. This QA Plan identifies the activities and responsibilities which are necessary in the design, procurement, fabrication, installation, and start up of this project in order to meet these objectives.

  6. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  7. Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison

    SciTech Connect (OSTI)

    Kelley, Nathan; Corsaro, Pietro

    2004-12-01

    Customer acceptance of high temperature superconducting (HTS) cable technology requires a substantial field demonstration illustrating both the system's technical capabilities and its suitability for installation and operation within the utility environment. In this project, the world's first underground installation of an HTS cable using existing ductwork, a 120 meter demonstration cable circuit was designed and installed between the 24 kV bus distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. The system incorporated cables, accessories, a refrigeration system, and control instrumentation. Although the system was never put in operation because of problems with leaks in the cryostat, the project significantly advanced the state-of-the-art in the design and implementation of Warm Dielectric cable systems in substation applications. Lessons learned in this project are already being incorporated in several ongoing demonstration projects.

  8. Notification of Planned 230kV Outage at Potomac River Generating Station |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy The next planned outage on xxxxx high voltage circuit between Palmers Corner Substation and the Potomac River Generating Station is scheduled for Sunday, June 3, 2007 and will begin at 4:00 AM with a scheduled return date of Saturday, June 9, 2007 at 2:00 PM. Notification of Planned 230kV Outage at Potomac River Generating Station (34.76 KB) More Documents & Publications Notification of Planned 230kV Outage at Potomac River Generating Station Notification of Planned

  9. Use of Static Compensators for Voltage Control at 330- and 500-kV Substations

    SciTech Connect (OSTI)

    Dement'ev, Yu. A.; Kochkin, V. I.; Idiatullov, R. M.; Papafanasopulo, S. G.; Smirnov, A. A.; Smirnov, S. G.

    2003-05-15

    A scheme for compensating the reactive power and controlling the voltage of high-voltage, intermediate-voltage, and low-voltage buses of 330 - 500-kV substations, which consist of static thyristor compensators (STC) on low-voltage autotransformers and controlled shunting reactors on high-voltage lines, is presented. It is shown that the STC can be created step-by-step beginning with the reactive part on substations with low-loaded lines. Results of installation of reactor groups of STC stepwise-controlled by vacuum switches at 330- and 500-kV substations are presented. Tests of the reactor groups have proved their high efficiency.

  10. EIS-0107: Mead-Phoenix +500-kV Direct Current Transmission Line

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration (WAPA) prepared this statement to analyze the potential environmental and socioeconomic impacts arising from WAPA and regional project sponsors’ proposal to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC), connecting the Westwing Substation, located north of Phoenix, Arizona, with a new McCullough II Substation, located approximately 14 miles west of Boulder City, Nevada. This statement modifies a previously prepared federal statement from which the participants' election to proceed had not occurred at the time this statement was prepared.

  11. Compact 180-kV Marx generator triggered in atmospheric air by femtosecond laser filaments

    SciTech Connect (OSTI)

    Arantchouk, L. Larour, J.; Point, G.; Brelet, Y.; Carbonnel, J.; Andr, Y.-B.; Mysyrowicz, A.; Houard, A.

    2014-03-10

    We developed a compact Marx generator triggered in atmospheric air by a single femtosecond laser beam undergoing filamentation. Voltage pulses of 180?kV could be generated with a subnanosecond jitter. The same laser beam was also used to initiate simultaneously guided discharges up to 21?cm long at the output of the generator.

  12. EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona

    Broader source: Energy.gov [DOE]

    Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

  13. Design and performance of a 30 KV electron gun with ten independent cathodes & a magnetic lens.

    SciTech Connect (OSTI)

    Rudys, Joseph Matthew; Reed, Kim Warren

    2006-08-01

    Measurements on a 30 kV electron gun with ten independent cathodes, operating in a 6.5 Tesla (T) magnetic field are presented. An earlier paper covered the design of this electron gun [1]. Experimental results are compared to model predictions. Beam current is compared to theoretical space charge limited flow.

  14. Craig-Bonanza 345-kV Transmission Line Project: Environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The Department of Energy (DOE), and the Western Area Power Administration (Western) proposes to construct and maintain a 345- kilovolt (kV) transmission line between Craig, Colorado, and Bonanza in eastern Utah. The project began in 1986 and construction is scheduled to be completed in 1989. The project, known as the Craig-Bonanza 345-kV Transmission Line Project (Project), will be located in Moffat and Rio Blanco counties in Colorado and Uintah County in Utah. Western has the lead role for project development and management, including environmental studies and construction. Cooperating federal agencies include the Bureau of Land Management (BLM), Rural Electrification Administration, US Fish and Wildlife Service, and Bureau of Indian Affairs. This environmental assessment was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ), the DOE and the BLM. 360 refs., 33 figs., 21 tabs.

  15. Design and Overview of 100 kV Bushing for the DNB Injector of ITER

    SciTech Connect (OSTI)

    Shah, Sejal; Bandyopadhyay, M.; Rotti, C.; Singh, M. J.; Roopesh, G.; Chakraborty, A. K. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Rajesh, S. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Microelectronics and Materials Physics Labs, P.O.Box 4500, FIN-90014 University of Oulu (Finland); Nishad, S.; Srusti, B. [DesignTech Systems Ltd, Banjara Hills, Hyderabad, Andhra Pradesh-500034 (India); Schunke, B.; Hemsworth, R.; Chareyre, J.; Svensson, L. [ITER Organisation, Route de Vinon, CS 90 046, 13067 St. Paul lez Durance Cedex (France)

    2011-09-26

    The 100 kV bushing is one of the most important and technologically challenging Safety Important Class (SIC) components of the Diagnostic Neutral Beam (DNB) injector of ITER. It forms interface between gas insulated electrical transmission line and torus primary vacuum and acts as a vacuum feedthrough of ITER. Design optimization has been carried out to meet the electric and structural requirements based on its classification. Unlike HNB bushing, single stage bushing is designed to provide 100 kV isolation. Finite Element Analysis (FEA) based optimization has been carried out for electrostatic and structural analysis. Manufacturing assembly sequence is studied and presented in this paper. However validation of the same is foreseen from manufacturer.

  16. Results of measuring input capacitance in 35-750 kV transformers and reactors

    SciTech Connect (OSTI)

    Vol'pov, K.D.; Sozinov, A.V.; Khalilov, F.Kh.

    1982-09-01

    The effect of the neutral grounding mode on input capacitance of 110-120 kV transformers was studied, inasmuch as in the system the neutral for a portion of the transformers was not grounded, with the objective of limiting nonsymmetrical short-circuit currents. Measurements showed that the input capacitance with a grounded neutral, as a rule, is greater than with an insulated neutral.

  17. EIS-0365: Imperial-Mexicali 230-kV Transmission Lines

    Broader source: Energy.gov [DOE]

    On February 27, 2001, Baja California Power, Inc. (hereafter referred to as Intergen), InterGen Aztec Energy, V.B.V., filed an application with DOE, Office of Fossil Energy, for a Presidential permit that would allow construction and connection of a double-circuit, 230-kV transmission line extending from the Imperial Valley Substation in California for a distance of about 6 mi (10 km) to a point west of Calexico at the U.S.-Mexico border.

  18. Environmental studies for a 1100-kV power line in Oregon. A special report

    SciTech Connect (OSTI)

    Rogers, L.; Hinds, R.

    1983-01-01

    In the first research project to monitor the effects of 1100-kV transmission on a natural ecosystem, researchers at Battelle, Pacific Northwest Laboratories have studied responses of wildlife, native plants, honeybees, and agricultural crops and cattle. No adverse effects were detected on wildlife, crops or cattle. Effects were observed on trees growing within the defined right of way and on honeybee colonies placed beneath the line.

  19. INTEGRATED 15KV SIC VSD AND HIGH-SPEED MW MOTOR FOR GAS COMPRESSION SYSTEMS

    Broader source: Energy.gov [DOE]

    Eaton Corporation – Arden, NC A 15 kilovolt (kV) SiC variable-speed drive will be integrated with a high-speed megawatt motor for gas compression applications. This new drive technology will be developed and tested to operate at greater than 99% efficiency and achieve 10 times the power density of competing drives, providing an integrated, highly-efficient motor and drive system for natural gas applications. Fact sheet coming soon.

  20. A 6 kV arbitrary waveform generator for the Tevatron Electron Lens

    SciTech Connect (OSTI)

    Pfeffer, H.; Saewert, G.

    2011-11-09

    This paper reports on a 6 kV modulator built and installed at Fermilab to drive the electron gun anode for the Tevatron Electron Lens (TEL). The TEL was built with the intention of shifting the individual (anti)proton bunch tunes to even out the tune spread among all 36 bunches with the desire of improving Tevatron integrated luminosity. This modulator is essentially a 6 kV arbitrary waveform generator that enables the TEL to define the electron beam intensity on a bunch-by-bunch basis. A voltage waveform is constructed having a 7 μs duration that corresponds to the tune shift requirements of a 12-bunch (anti)proton beam pulse train. This waveform is played out for any one or all three bunch trains in the Tevatron. The programmed waveform voltages transition to different levels at time intervals corresponding to the 395 ns bunch spacing. In addition, complex voltage waveforms can be played out at a sustained rate of 143 kHz over the full 6 kV output range. This paper describes the novel design of the inductive adder topology employing five transformers. It describes the design aspects that minimize switching losses for this multi-kilovolt, high repetition rate and high duty factor application.

  1. A 120kV IGBT modulator for driving a pierce electron gun

    SciTech Connect (OSTI)

    Earley, L. M.; Brown, R. W.; Carlson, R. L.; Ferguson, P.; Haynes, W. B.; Kirbie, H. C.; Russell, S. J.; Sigler, F. E.; Smirnova, E. I.; Wheat, R. M.

    2004-01-01

    An IGBT modulator has been developed to drive a 120 kV, 23 A Pierce electron gun. The modulator is capable of producing pulses up to 10 {mu}s in width at repetition rates up to 10Hz with no active reset. The pulse rise time on the electron gun will be approximately 2 {mu}s and the remaining 8 {mu}s of flattop is tuned to have a ripple of less than 1 percent rms. The modulator technology was developed from a previous 50 kV prototype. The modulator consists of six boards, each with one EUPEC IGBT that drives a single common step-up transformer wound on METGLAS 2605SC cores. The six transformer cores share a common bi-filar output secondary winding. The modulator uses a fiber optic trigger system and has a high voltage cable output with an epoxy receptacle on the oil end and a ceramic receptacle on the vacuum end. The 120 kV electron gun was manufactured by MDS Co. and will be used to generate sheet electron beams from the standard pencil beam produced by the Pierce electron gun.

  2. A 6 kV arbitrary waveform generator for the Tevatron Electron Lens

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Pfeffer, H.; Saewert, G.

    2011-11-09

    This paper reports on a 6 kV modulator built and installed at Fermilab to drive the electron gun anode for the Tevatron Electron Lens (TEL). The TEL was built with the intention of shifting the individual (anti)proton bunch tunes to even out the tune spread among all 36 bunches with the desire of improving Tevatron integrated luminosity. This modulator is essentially a 6 kV arbitrary waveform generator that enables the TEL to define the electron beam intensity on a bunch-by-bunch basis. A voltage waveform is constructed having a 7 μs duration that corresponds to the tune shift requirements of amore » 12-bunch (anti)proton beam pulse train. This waveform is played out for any one or all three bunch trains in the Tevatron. The programmed waveform voltages transition to different levels at time intervals corresponding to the 395 ns bunch spacing. In addition, complex voltage waveforms can be played out at a sustained rate of 143 kHz over the full 6 kV output range. This paper describes the novel design of the inductive adder topology employing five transformers. It describes the design aspects that minimize switching losses for this multi-kilovolt, high repetition rate and high duty factor application.« less

  3. A Study of Electromagnetic Radiation of Corona Discharge Near 500-Kv Electric Installations

    SciTech Connect (OSTI)

    Korzhov, A. V.; Okrainskaya, I. S.; Sidorov, A. I.; Kufel'd, V. D.

    2004-01-15

    Data on the spectral composition and intensity of electromagnetic radiation of corona discharge are obtained in an experimental study performed on the outdoor switchgear of the Shagol 500-kV substation of the Chelyabinsk Enterprise of Trunk Transmission Grids and under a 500-kV Shagol - Kozyrevo overhead transmission line. The electromagnetic environment on the territory of the 500-kV outdoor switchgear is shown to be determined by narrow-band radiations (harmonics of the frequency of electric supply) and wide-band radiations due to corona discharges of high-voltage sources. This means that the personnel experience the action of a commercial-frequency electric field and electromagnetic radiation of a quite wide range, which is not allowed for by the existing guidelines. It is recommended to continue the study in cooperation with medical institutions in order to create guidelines that would allow for the joint action of commercial-frequency electric field and electromagnetic radiation and for the voltage in the line, the current load, the meteorological situation, and other factors.

  4. Poster Thur Eve 10: Partial kV CBCT, complete kV CBCT and EPID in breast treatment: a dose comparison study for skin, breasts, heart and lungs

    SciTech Connect (OSTI)

    Roussin, E; Archambault, L K; Wierzbicki, W

    2014-08-15

    The advantages of kilovoltage cone beam CT (kV CBCT) imaging over electronic portal imaging device (EPID) such as accurate 3D anatomy, soft tissue visualization, fast rigid registration and enhanced precision on patient positioning has lead to its increasing use in clinics. The benefits of this imaging technique are at the cost of increasing the dose to healthy surrounding organs. Our center has moved toward the use of daily partial rotation kV CBCT to restrict the dose to healthy tissues. This study aims to better quantify radiation doses from different image-guidance techniques such as tangential EPID, complete and partial kV CBCT for breast treatments. Cross-calibrated ionization chambers and kV calibrated Gafchromic films were used to measure the dose to the heart, lungs, breasts and skin. It was found that performing partial kV CBCT decreases the heart dose by about 36%, the lungs dose by 31%, the contralateral breast dose by 41% and the ipsilateral breast dose by 43% when compared to a full rotation CBCT. The skin dose measured for a full rotation CBCT was about 0.8 cGy for the contralateral breast and about 0.3 cGy for the ipsilateral breast. The study is still ongoing and results on skin doses for partial rotation kV CBCT as well as for tangential EPID images are upcoming.

  5. Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-09

    BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability

  6. Environmental assessment: Warren Air Force Base 115-kV transmission line, Cheyenne, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1986-03-01

    The Western Area Power Administration (Western), is propsoing to construct a new electrical tranmission line and substation in southeastern Wyoming. This proposed line, called the Warren Air Force Base Tranmission Line, will supply power for Western's system to Francis E.Warren Air Force Base (F.E. Warren AFB) near Cheyenne. It would allow for increased tranmission capacity to the air base. F.E. Warren AFB currently is served electrically be Western via a 13.8-kv line. It is a wood-pole, double-circuit line without an overhead ground wire, which extends from Western's Cheyenne Substation, through an urban area, and onto the air base. The Cheyenne Substation is located on the south side of the city of Cheyenne. The electrical load on the base is increasing from 4 megawatts (MW) to 11 or 12 MW, an approximate three-fold increase. Voltage problems occasionally occur at the base due to the present electrial loads and to the age and inadequacy of the 13.8-kv line, which was placed in service in 1941. The existing line has served beyond its designed service life and requires replacement. Replacement would be necessary even without an increasing load. F.E. Warren AFB has several new and expanding programs, including additional housing, shopping centers, and the Peacekeeper Missile Program. Part of this expansion already has occured; the remainder is expected by early 1988. This expansion has created the need for additional electrical service. The present 13.8-kV line is not capable of supporting the additional load. 28 refs., 4 figs., 2 tabs.

  7. Collimated electron beam accelerated at 12 kV from a Penning discharge

    SciTech Connect (OSTI)

    Toader, D.; Oane, M.; Ticoş, C. M.

    2015-01-15

    A pulsed electron beam accelerated at 12 kV with a duration of 40 μs per pulse is obtained from a Penning discharge with a hollow anode and two cathodes. The electrons are extracted through a hole in one of the cathodes and focused by a pair of coils. The electron beam has a diameter of a few mm in the cross section, while the beam current reaches peak values of 400 mA, depending on the magnetic field inside the focussing coils. This relatively inexpensive and compact device is suitable for the irradiation of small material samples placed in high vacuum.

  8. Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska

    SciTech Connect (OSTI)

    Not Available

    1991-06-01

    This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

  9. Metal artifact correction for x-ray computed tomography using kV and selective MV imaging

    SciTech Connect (OSTI)

    Wu, Meng; Keil, Andreas; Constantin, Dragos; Star-Lack, Josh; Zhu, Lei; Fahrig, Rebecca

    2014-12-15

    Purpose: The overall goal of this work is to improve the computed tomography (CT) image quality for patients with metal implants or fillings by completing the missing kilovoltage (kV) projection data with selectively acquired megavoltage (MV) data that do not suffer from photon starvation. When both of these imaging systems, which are available on current radiotherapy devices, are used, metal streak artifacts are avoided, and the soft-tissue contrast is restored, even for regions in which the kV data cannot contribute any information. Methods: Three image-reconstruction methods, including two filtered back-projection (FBP)-based analytic methods and one iterative method, for combining kV and MV projection data from the two on-board imaging systems of a radiotherapy device are presented in this work. The analytic reconstruction methods modify the MV data based on the information in the projection or image domains and then patch the data onto the kV projections for a FBP reconstruction. In the iterative reconstruction, the authors used dual-energy (DE) penalized weighted least-squares (PWLS) methods to simultaneously combine the kV/MV data and perform the reconstruction. Results: The authors compared kV/MV reconstructions to kV-only reconstructions using a dental phantom with fillings and a hip-implant numerical phantom. Simulation results indicated that dual-energy sinogram patch FBP and the modified dual-energy PWLS method can successfully suppress metal streak artifacts and restore information lost due to photon starvation in the kV projections. The root-mean-square errors of soft-tissue patterns obtained using combined kV/MV data are 10–15 Hounsfield units smaller than those of the kV-only images, and the structural similarity index measure also indicates a 5%–10% improvement in the image quality. The added dose from the MV scan is much less than the dose from the kV scan if a high efficiency MV detector is assumed. Conclusions: The authors have shown that it

  10. Long-term stability and mechanical characteristics of kV digital imaging system for proton radiotherapy

    SciTech Connect (OSTI)

    Zhu, Mingyao Botticello, Thomas; Lu, Hsiao-Ming; Winey, Brian

    2014-04-15

    Purpose: To quantitatively evaluate the long-term image panel positioning stability and gantry angle dependence for gantry-mounted kV imaging systems. Methods: For patient setup digital imaging systems in isocentric rotating proton beam delivery facilities, physical crosshairs are commonly inserted into the snout to define the kV x-ray beam isocenter. Utilizing an automatic detection algorithm, the authors analyzed the crosshair center positions in 2744 patient setup kV images acquired with the four imagers in two treatment rooms from January 2012 to January 2013. The crosshair position was used as a surrogate for imaging panel position, and its long-term stability at the four cardinal angles and the panel flex dependency on gantry angle was investigated. Results: The standard deviation of the panel position distributions was within 0.32 mm (with the range of variation less than ± 1.4 mm) in both the X-Z plane and Y direction. The mean panel inplane rotations were not more than 0.51° for the four panels at the cardinal angles, with standard deviations ≤0.26°. The panel position variations with gantry rotation due to gravity (flex) were within ±4 mm, and were panel-specific. Conclusions: The authors demonstrated that the kV image panel positions in our proton treatment system were highly reproducible at the cardinal angles over 13 months and also that the panel positions can be correlated to gantry angles. This result indicates that the kV image panel positions are stable over time; the amount of panel sag is predictable during gantry rotation and the physical crosshair for kV imaging may eventually be removed, with the imaging beam isocenter position routinely verified by adequate quality assurance procedures and measurements.

  11. New 500-kV Ion Source Test Strand for HIF

    SciTech Connect (OSTI)

    Sangster, T.C.; Ahle, L.E.; Halaxa, E.F.; Karpenko, V.P.; Oldaker, M.E.; Mitchell, J.W.; Beck, D.N.; Bieniosek, F.M.; Henestroza, E.; Kwan, J.W.

    2000-03-09

    One of the most challenging aspects of ion beam driven inertial fusion energy is the reliable and efficient generation of low emittance, high current ion beams. The primary ion source requirements include a rise time of order 1-{micro}sec, a pulse width of at least 20-{micro}sec, a flattop ripple of less than 0.1% and a repetition rate of at least 5-HZ. Naturally, at such a repetition rate, the duty cycle of the source must be greater than 10{sup 8} pulses. Although these specifications do not appear to exceed the state-of-the-art for pulsed power, considerable effort remains to develop a suitable high current ion source. Therefore, we are constructing a 500-kV test stand specifically for studying various ion source concepts including surface, plasma and metal vapor arc. This paper will describe the test stand design specifications as well as the details of the various subsystems and components.

  12. A New 500-kV Ion Source Test Stand for HIF

    SciTech Connect (OSTI)

    Sangster, T.C.; Ahle, L.E.; Halaxa, E.F.; Karpenko, V.P.; Oldaker, M. E.; Mitchell, J.W.; Beck, D.N.; Bieniosek, F.M.; Henestroza, E.; Kwan, J.W.

    2000-10-05

    One of the most challenging aspects of ion beam driven inertial fusion energy is the reliable and efficient generation of low emittance, high current ion beams. The primary ion source requirements include a rise time of order 1-msec, a pulse width of at least 20-msec, a flattop ripple of less than 0.1% and a repetition rate of at least 5-Hz. Naturally, at such a repetition rate, the duty cycle of the source must be greater than 108 pulses. Although these specifications do not appear to exceed the state-of-the-art for pulsed power, considerable effort remains to develop a suitable high current ion source. Therefore, we are constructing a 500-kV test stand specifically for studying various ion source concepts including surface, plasma and metal vapor arc. This paper will describe the test stand design specifications as well as the details of the various subsystems and components.

  13. Final environmental assessment: Los Reales 115 kV transmission line alternative routes

    SciTech Connect (OSTI)

    Not Available

    1989-10-01

    The Central Arizona Project (CAP) was authorized as a part of the Colorado River Basin Project Act (Public Law 90-537) on September 30, 1968. The primary purpose of the CAP is to furnish water for agricultural, municipal, and industrial uses in central and southern Arizona, and western New Mexico. Due to its magnitude, the CAP is divided into several major features serving separate but interrelated functions. The Tucson Aqueduct Phase B pumping plants were designed and constructed to operate on a looped power system. The entire looped power system, including two switching stations and connecting 115-kv transmission lines, was identified in the FEIS and approved for construction in the Secretary of Interior's Record of Decision dated September 24, 1985. The loop begins in the vicinity of the Twin Peaks Pumping Plant -- the northernmost Phase B pumping station, at the Rattlesnake Switching Station. All of the looped power system has been constructed with the exception of the switching station and portion of transmission line proposed to be constructed in this project. Without construction of this final portion of the looped power system, the Phase B pumping plants will not be able to operate normally without negatively affecting nearby power sources. The CAP will also not be able to provide the reliability necessary for municipal water systems dependent upon CAP water. The purpose of this EA is to describe impacts that would result from relocating the Los Reales 115-kV transmission line, and possibly the switching station, originally identified in the FEIS. It should be mentioned the Department of Energy will complete a separate NEPA review.

  14. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 230-kV transmission line in Washington State. BPA’s proposed action is to interconnect the proposed transmission line to an existing BPA substation.

  15. Theoretical investigation of the design and performance of a dual energy (kV and MV) radiotherapy imager

    SciTech Connect (OSTI)

    Liu, Langechuan; Antonuk, Larry E. El-Mohri, Youcef; Zhao, Qihua; Jiang, Hao

    2015-04-15

    Purpose: In modern radiotherapy treatment rooms, megavoltage (MV) portal imaging and kilovoltage (kV) cone-beam CT (CBCT) imaging are performed using various active matrix flat-panel imager (AMFPI) designs. To expand the clinical utility of MV and kV imaging, MV AMFPIs incorporating thick, segmented scintillators and, separately, kV imaging using a beams eye view geometry have been investigated by a number of groups. Motivated by these previous studies, it is of interest to explore to what extent it is possible to preserve the benefits of kV and MV imaging using a single AMFPI design, given the considerably different x ray energy spectra used for kV and MV imaging. In this paper, considerations for the design of such a dual energy imager are explored through examination of the performance of a variety of hypothetical AMFPIs based on x ray converters employing segmented scintillators. Methods: Contrast, noise, and contrast-to-noise ratio performances were characterized through simulation modeling of CBCT imaging, while modulation transfer function, Swank factor, and signal performance were characterized through simulation modeling of planar imaging. The simulations were based on a previously reported hybrid modeling technique (accounting for both radiation and optical effects), augmented through modeling of electronic additive noise. All designs employed BGO scintillator material with thicknesses ranging from 0.25 to 4 cm and element-to-element pitches ranging from 0.508 to 1.016 mm. A series of studies were performed under both kV and MV imaging conditions to determine the most advantageous imager configuration (involving front or rear x ray illumination and use of a mirror or black reflector), converter design (pitch and thickness), and operating mode (pitch-binning combination). Results: Under the assumptions of the present study, the most advantageous imager design was found to employ rear illumination of the converter in combination with a black reflector

  16. The 345 kV underground/underwater Long Island Sound cable project

    SciTech Connect (OSTI)

    Grzan, J.; Hahn, E.I. ); Casalaina, R.V.; Kansog, J.O.C. )

    1993-07-01

    A high voltage underground/underwater cable system was installed to increase the transmission capacity from the mainland of New York to Long Island. In terms of weight and diameter, the self-contained, fluid-filled (SCFF) cable used for the underwater portion of the project is the largest underwater cable in the world. The use of high-pressure, fluid-filled (HPFF) pipe-type cable on the land portion represents the largest application of paper-polypropylene-paper (PPP) insulated cable in the United States. State-of-the-art technologies were implemented in the use of fiber optic cables for relay protection and SCADA/RTU, temperature monitoring and leak detection systems, SF[sub 6] gas-insulated substations, and underwater cable laying and embedment techniques. This paper discusses the design and installation of a 750 MVA, 43 km (26.6 mi), 345 kV underground/underwater electric transmission system installed by the New York Power Authority (NYPA).

  17. 1.9 kV AlGaN/GaN Lateral Schottky Barrier Diodes on Silicon

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Zhu, Mingda; Song, Bo; Qi, Meng; Hu, Zongyang; Nomoto, Kazuki; Yan, Xiaodong; Cao, Yu; Johnson, Wayne; Kohn, Erhard; Jena, Debdeep; et al

    2015-02-16

    In this letter, we present AlGaN/GaN lateral Schottky barrier diodes on silicon with recessed anodes and dual field plates. A low specific on-resistance RON,SP (5.12 mΩ · cm2), a low turn-on voltage (<0.7 V) and a high reverse breakdown voltage BV (>1.9 kV), were simultaneously achieved in devices with a 25 μm anode/cathode separation, resulting in a power figure-of-merit (FOM) BV2/RON,SP of 727 MW·cm2. The record high breakdown voltage of 1.9 kV is attributed to the dual field plate structure.

  18. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  19. EIS-0025: Miles City-New Underwood 230-kV Electrical Transmission Line, Montana, North Dakota, and South Dakota

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the environmental and socioeconomic implications of its proposed action to construct a 3.28-mile, 230-kV transmission line between Miles City and Baker, Montana, Hettinger, North Dakota, and New Underwood, South Dakota, in Custer and Fallon Counties in Montana, Adams, Bowman, and Slope Counties in North Dakota and Meade, Pennington, and Perkins Counties in South Dakota.

  20. Heavy duty insulator assemblies for 500-kV bulk power transmission line with large diameter octagonalbundled conductor

    SciTech Connect (OSTI)

    Tsujimoto, K.; Hayase, I.; Hirai, J.; Inove, M.; Naito, K.; Yukino, T.

    1982-11-01

    This paper describes the design procedure and the results of field tests on mechanical performances of insulator assemblies newly developed to support octagonal-bundled conductors for 500-kV bulk power transmission. Taking account of conductor-motion-induced peak tensile load, fatigue, torsional torque and others, a successful design has been achieved in two prototype assemblies for such heavy mechanical duties as encountered during conductor galloping or swing. This has been proved throughout three years of the field tests.

  1. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    SciTech Connect (OSTI)

    1995-05-01

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  2. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  3. EIS-0005-FS: Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental

    Broader source: Energy.gov [DOE]

    This Bonneville Power Administration document assesses the environmental impacts of constructing transmission facilities, which will coordinate with the Midpoint-Malin 500-kV line to be constructed by the Pacific Power and Light (PP&L) Company. The proposed action includes the construction of the 1.56-mile Buckley-Summer Lake 500-kV transmission line; the proposed Buckley Substation near Maupin, Oregon; and the proposed Summer Lake Substation near Silver Lake, Oregon.

  4. Solid-State Fault Current Limiter Development : Design and Testing Update of a 15kV SSCL Power Stack

    SciTech Connect (OSTI)

    Dr. Ram Adapa; Mr. Dante Piccone

    2012-04-30

    ABSTRACT The Solid-State Fault Current Limiter (SSCL) is a promising technology that can be applied to utility power delivery systems to address the problem of increasing fault currents associated with load growth. As demand continues to grow, more power is added to utility system either by increasing generator capacity or by adding distributed generators, resulting in higher available fault currents, often beyond the capabilities of the present infrastructure. The SSCL is power-electronics based equipment designed to work with the present utility system to address this problem. The SSCL monitors the line current and dynamically inserts additional impedance into the line in the event of a fault being detected. The SSCL is based on a modular design and can be configured for 5kV through 69kV systems at nominal current ratings of 1000A to 4000A. Results and Findings This report provides the final test results on the development of 15kV class SSCL single phase power stack. The scope of work included the design of the modular standard building block sub-assemblies, the design and manufacture of the power stack and the testing of the power stack for the key functional tests of continuous current capability and fault current limiting action. Challenges and Objectives Solid-State Current Limiter technology impacts a wide spectrum of utility engineering and operating personnel. It addresses the problems associated with load growth both at Transmission and Distribution class networks. The design concept is pioneering in terms of developing the most efficient and compact power electronics equipment for utility use. The initial test results of the standard building blocks are promising. The independent laboratory tests of the power stack are promising. However the complete 3 phase system needs rigorous testing for performance and reliability. Applications, Values, and Use The SSCL is an intelligent power-electronics device which is modular in design and can provide current

  5. The results of systems tests of the 500 kV busbar controllable shunting reactor in the Tavricheskaya substation

    SciTech Connect (OSTI)

    Gusev, S. I.; Karpov, V. N.; Kiselev, A. N.; Kochkin, V. I.

    2009-09-15

    The results of systems tests of the 500 kV busbar magnetization-controllable shunting reactor (CSR), set up in the Tavricheskaya substation, including measurements of the quality of the electric power, the harmonic composition of the network currents of the reactor for different values of the reactive power consumed, the determination of the regulating characteristics of the reactor, the speed of response of the shunting reactor in the current and voltage stabilization modes, and also the operation of the reactor under dynamic conditions for different perturbations, are presented. The results obtained are analyzed.

  6. OPERATIONAL RESULTS OF THE SPALLATION NEUTRON SOURCE (SNS) POLYPHASE CONVERTER-MODULATOR FOR THE 140 KV KLYSTRON RF SYSTEMS

    SciTech Connect (OSTI)

    W.A. REASS; J.D. DOSS; ET AL

    2001-06-01

    This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltage-switching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three ''H-Bridge'' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

  7. Improvements in the computation of balances and localization of commercial losses of electric energy in 0.38-kV networks

    SciTech Connect (OSTI)

    Vorotnitskii, V. Z.; Zaslonov, S. V.; Lysyuk, S. S.

    2006-11-15

    An example of four 0.38-kV overhead distribution lines fed from a 10/0.4-kV transformer substation of the Grodno Electrical Networks (Belarus') and supplying electricity to a cottage area is used for analyzing energy balances and commercial losses in the networks. It is shown that the reliability of such analysis can be ensured by the use of modern software and electronic energy meters recording a retrospective of half-hourly intervals of active and reactive electric energy.

  8. SU-D-207-03: Development of 4D-CBCT Imaging System with Dual Source KV X-Ray Tubes

    SciTech Connect (OSTI)

    Nakamura, M; Ishihara, Y; Matsuo, Y; Ueki, N; Iizuka, Y; Mizowaki, T; Hiraoka, M

    2015-06-15

    Purpose: The purposes of this work are to develop 4D-CBCT imaging system with orthogonal dual source kV X-ray tubes, and to determine the imaging doses from 4D-CBCT scans. Methods: Dual source kV X-ray tubes were used for the 4D-CBCT imaging. The maximum CBCT field of view was 200 mm in diameter and 150 mm in length, and the imaging parameters were 110 kV, 160 mA and 5 ms. The rotational angle was 105°, the rotational speed of the gantry was 1.5°/s, the gantry rotation time was 70 s, and the image acquisition interval was 0.3°. The observed amplitude of infrared marker motion during respiration was used to sort each image into eight respiratory phase bins. The EGSnrc/BEAMnrc and EGSnrc/DOSXYZnrc packages were used to simulate kV X-ray dose distributions of 4D-CBCT imaging. The kV X-ray dose distributions were calculated for 9 lung cancer patients based on the planning CT images with dose calculation grid size of 2.5 x 2.5 x 2.5 mm. The dose covering a 2-cc volume of skin (D2cc), defined as the inner 5 mm of the skin surface with the exception of bone structure, was assessed. Results: A moving object was well identified on 4D-CBCT images in a phantom study. Given a gantry rotational angle of 105° and the configuration of kV X-ray imaging subsystems, both kV X-ray fields overlapped at a part of skin surface. The D2cc for the 4D-CBCT scans was in the range 73.8–105.4 mGy. Linear correlation coefficient between the 1000 minus averaged SSD during CBCT scanning and D2cc was −0.65 (with a slope of −0.17) for the 4D-CBCT scans. Conclusion: We have developed 4D-CBCT imaging system with dual source kV X-ray tubes. The total imaging dose with 4D-CBCT scans was up to 105.4 mGy.

  9. Experimental investigations of overvoltages in 6kV station service cable networks of thermal power plants

    SciTech Connect (OSTI)

    Vukelja, P.I.; Naumov, R.M.; Drobnjak, G.V.; Mrvic, J.D.

    1996-12-31

    The paper presents the results of experimental investigations of overvoltages on 6kV isolated neutral station service cable networks of thermal power plants. The overvoltages were recorded with capacitive voltage measurement systems made at the Nikola Tesla Institute. Wideband capacitive voltage measurement systems recorded a flat response from below power frequencies to 10MHz. Investigations of overvoltages were performed for appearance and interruption of metal earth faults, intermittent earth faults, switching operation of HV motors switchgear, switching operation of transformers switchgear, and transfer of the network supply from one transformer to another. On the basis of these investigations, certain measures are proposed for limiting overvoltages and for the reliability of station service of thermal power plants.

  10. Type A Accident Investigation Board Report of the April 25, 1997, Contractor Fatality on the Olympia-White River #1 230 kV Line

    Broader source: Energy.gov [DOE]

    On April 25, 1997, at approximately 1510 hours, a lineman for Great Southwestern Construction Inc. was fatally electrocuted when he came in direct contact with a deenergized 230-kilovolt (kV) transmission power line conductor which contained an induced voltage.

  11. Increasing the reliability of the shutdown of 500 - 750-kV overhead lines equipped with shunt reactors in an unsuccessful three-phase automatic repeated closure cycle

    SciTech Connect (OSTI)

    Kuz'micheva, K. I.; Merzlyakov, A. S.; Fokin, G. G.

    2013-05-15

    The reasons for circuit-breaker failures during repeated disconnection of 500 - 750 kV overhead lines with shunt reactors in a cycle of unsuccessful three-phase automatic reconnection (TARC) are analyzed. Recommendations are made for increasing the operating reliability of power transmission lines with shunt reactors when there is unsuccessful reconnection.

  12. Type A Accident Investigation Report on the June 25, 1997, Contractor Inspector Fatality on the Satsop-Aberdeen #2 & #3 230 kV Line

    Broader source: Energy.gov [DOE]

    On June 27, 1997, I established a Type-A Accident Investigation Board to investigate the June 25, 1997 fatal contractor accident which occurred on BPA’s Satsop-Aberdeen #2 and #3 230-kV transmission lines right-of-way.

  13. Seasonal Patterns of Melatonin, Cortisol, and Progesterone Secretion in Female Lambs Raised Beneath a 500-kV Transmission Line.

    SciTech Connect (OSTI)

    Lee, Jack M.

    1992-06-01

    Although several kinds of biological effects of electric and magnetic fields have been reported from laboratory studies, few have been independently replicated. When this study was being planned, the suppression of nighttime melatonin in rodents was thought to represent one of the strongest known effects of these fields. The effect had been replicated by a single laboratory for 60-Hz electric fields, and by multiple laboratories for d-c magnetic fields. The primary objective of this study was to determine whether the effect of electric and magnetic fields on melatonin would also occur in sheep exposed to a high voltage transmission line. The specific hypothesis tested by this experiment was as follows: The electrical environment produced by a 60-Hz, 500-kV transmission line causes a depression in nocturnal melatonin in chronically exposed female lambs. This may mimic effects of pinealectomy or constant long-day photoperiods, thus delaying the onset of reproductive cycles. Results of the study do not provide evidence to support the hypothesis. Melatonin concentrations in the sheep exposed to the transmission line showed the normal pattern of low daytime and high nighttime serum levels. As compared to the control group, there were no statistically significant group differences in the mean amplitude, phase, or duration of the nighttime melatonin elevation.

  14. Development and experience of large conductor cable 35-kV joints at the Los Angeles Department of Water and Power

    SciTech Connect (OSTI)

    Calderon, F.; Findon, E.J. )

    1990-01-01

    The Los Angeles Department of Water and Power (LADWP) places a high priority on developing its distribution system in the most reliable and cost-effective manner. At higher distribution voltages, such as 34.5-kV, jointing systems which are easily, consistently, and quickly installed by both utility and contracted personnel offer significant economic advantages. With increasing loads and higher load densities at LADWP, the use of 34.5-kV, cross-linked polyethylene (CLP) aluminum, 1000-kcmil cable is becoming more common to meet customer load requirements. Two methods of jointing this large conductor cable were historically used, although each method had limitations. This paper provides an overview of LADWP's distribution system, past jointing techniques, the investigation and evaluation of alternate approaches, and the field experience with the joint selected for use.

  15. Level 1 Accident Investigation Report of August 17, 2004, Fatal Aircraft Accident on the Grand Coulee-Bell No.6, 500 kV Line

    Broader source: Energy.gov [DOE]

    On August 17, 2004, at approximately 0940, a Bonneville Power Administration (BPA) pilot was killed in the crash of a Bell 206BIII helicopter while stringing "sock line" to enable the subsequent stringing of new conductors and static wire on the Grand Coulee-Bell #6 500-kV line between tower 84/2 and BPA’s Bell Substation in Mead, Washington. (See Appendix 7, Site Map.)

  16. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  17. Development of 230-kV high-pressure, gas-filled, pipe-type cable system: Model test program phase

    SciTech Connect (OSTI)

    Silver, D.A. )

    1990-09-01

    The objective of this project was the development of a 230 kV high-pressure gas-filled (HPGF) pipe-type cable employing paper or laminate of paper-polypropylene-paper (PPP) insulation pressurized with N{sub 2} gas or a blend of 15% SF{sub 6}/85% N{sub 2} gas. Heretofore, HPGF pipe-type cables have been restricted to 138 kV ratings due to technical difficulties in achieving higher voltage ratings. In view of the high cost of manufacturing and testing a large number of full size cables, cable models with 2 mm (80 mils) and 2.5 mm (100 mils) wall thicknesses of insulation enclosed in a test fixture capable of withstanding a test pressure of 2070 kPa (300 psig) and high electrical stresses were employed for dissipation factor versus voltage measurements and for ac and impulse breakdown tests at rated and emergency operating temperatures. In addition, a 36 cm (14 in) full wall cable model enclosed in a pressure vessel was utilized for transient pressure response tests. The results of this investigation attest tot he technical feasibility of the design and manufacture of a 230 kV HPGF pipe-type cable employing paper or PPP insulation pressurized with 100% N{sub 2} gas or a blend of 15% SF{sub 6}/85% N{sub 2} gas for operation under normal and 100 hour emergency conditions at conductor temperatures of 85{degree} and 105{degree}C, respectively. The manufacture of a full size PPP insulated cable pressurized with a blend of 15% SF{sub 6}/85% N{sub 2} gas employing pre-impregnated PPP insulating tapes and an annular conductor based on the design stresses defined in this report is recommended for laboratory evaluation and extended life tests. 11 refs., 45 figs., 11 tabs.

  18. Case Study of the Failure of two 13.8kV Control & Metering Transformers that caused significant Equipment Damage

    SciTech Connect (OSTI)

    Dreifuerst, G R; Chew, D B; Mangonon, H L; Swyers, P W

    2011-08-25

    The degradation and failure of cast-coil epoxy windings within 13.8kV control power transformers and metering potential transformers has been shown to be dangerous to both equipment and personnel, even though best industrial design practices were followed. Accident scenes will be examined for two events at a U.S. Department of Energy laboratory. Failure modes will be explained and current design practices discussed with changes suggested to prevent a recurrence and to minimize future risk. New maintenance philosophies utilizing partial discharge testing of the transformers as a prediction of end-of-life will be examined.

  19. Development of NS-TACSR with extremely suppressed aeolian noise and its application to 500 kV overhead transmission lines

    SciTech Connect (OSTI)

    Tsujimoto, K.; Furukawa, S. (Kansai Electric Power Co., Inc., Osaka (Japan)); Shimojima, K.; Yamamoto, K. (Hitachi Cable, Ltd., Hitachi (JP))

    1991-10-01

    Recently in Japan, with the unprecedented advance of residential area development in the suburbs of large cities, it has become quite difficult to secure the routes of EHV transmission lines from nuclear power plants in remote places to the suburbs of large cities, urging resolution of environmental problems related to transmission lines. In Japan, aerodynamic sound produced by conductors and insulators frequently caused noise problems. Having an opportunity of constructing a 500 kV transmission line through a residential are, we made a research to resolve this noise problem. This paper describes the characteristics of aeolian noise and preventive measures against it.

  20. EIS-0285-SA-84: Supplement Analysis | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    No. 2 500kV and the Arlington-Bellingham 230kV transmission line corridors which run parallel to the subject transmission line. Corridor width varies from 140 to 825 feet....

  1. EIS-0285-SA-129: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission System Vegetation Management Program Vegetation Management for the Ashe-Marion 2 500 kV transmission line from structure 1502 through structure 1577. Bonneville...

  2. TH-C-18A-10: The Influence of Tube Current On X-Ray Focal Spot Size for 70 KV CT Imaging

    SciTech Connect (OSTI)

    Duan, X; Grimes, J; Yu, L; Leng, S; McCollough, C

    2014-06-15

    Purpose: Focal spot blooming is an increase in the focal spot size at increased tube current and/or decreased tube potential. In this work, we evaluated the influence of tube current on the focal spot size at low kV for two CT systems, one of which used a tube designed to reduce blooming effects. Methods: A slit camera (10 micron slit) was used to measure focal spot size on two CT scanners from the same manufacturer (Siemens Somatom Force and Definition Flash) at 70 kV and low, medium and maximum tube currents, according to the capabilities of each system (Force: 100, 800 and 1300 mA; Flash: 100, 200 and 500 mA). Exposures were made with a stationary tube in service mode using a raised stand without table movement or flying focal spot technique. Focal spot size, nominally 0.8 and 1.2 mm, respectively, was measured parallel and perpendicular to the cathode-anode axis by calculating the full-width-at-half-maximum of the slit profile recording using computed radiographic plates. Results: Focal spot sizes perpendicular to the anode-cathode axis increased at the maximum mA by 5.7% on the Force and 39.1% on the Flash relative to that at the minimal mA, even though the mA was increased 13-fold on the Force and only 5- fold on the Flash. Focal spot size increased parallel to the anode-cathode axis by 70.4% on Force and 40.9% on Flash. Conclusion: For CT protocols using low kV, high mA is typically required. These protocols are relevant in children and smaller adults, and for dual-energy scanning. Technical measures to limit focal spot blooming are important in these settings to avoid reduced spatial resolution. The x-ray tube on a recently-introduced scanner appears to greatly reduce blooming effects, even at very high mA values. CHM has research support from Siemens Healthcare.

  3. Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. [Forbes Substation

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company's (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP's original amendment request remain valid.

  4. Environmental Assessment and Finding of No Significant Impact: Curecanti-Lost Canyon 230-kV Transmission Line Reroute Project, Montrose County, Colorado

    SciTech Connect (OSTI)

    N /A

    2000-03-20

    The Department of Energy (DOE), Western Area Power Administration (Western) is proposing to reroute a section of the Curecanti-Lost Canyon 230-kilovolt (kV) transmission line, in Montrose County, Colorado. A portion of the transmission line, situated 11 miles southeast of Montrose, Colorado, crosses Waterdog Peak, an area of significant geologic surface activity, which is causing the transmission line's lattice steel towers to shift. This increases stress to structure hardware and conductors, and poses a threat to the integrity of the transmission system. Western proposes to relocate the lattice steel towers and line to a more geologically stable area. The existing section of transmission line and the proposed relocation route cross Bureau of Land Management and private land holdings.

  5. Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

  6. Proposed amendment for Presidential Permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada Northern States Power Company. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Northern States Power Company, (NSP), a Minnesota investor owned utility has applied to the Office of Fossil Energy, United States Department of Energy, to amend Presidential Permit PP-63 to allow for alterations to the 500 kV transmission line and as sedated facilities currently regulated by this permit. The alterations proposed for the 500 kV line owned by NSP are part of a long term effort sponsored by NSP to upgrade the existing NSP transmission system to allow for increased exchange of electricity with the Manitoba Hydro-Electric Board. Presidential Permit PP-63 authorized NSP to construct, connect, operate and maintain a 500 kV line at the United States/Canadian border approximately seven-and-a-half miles west of Warroad in Roseau County, Minnesota. This line connects with a 500 kV line owned and operated by the Manitoba Hydro-Electric Board (MHEB), which extends from Dorsey, Manitoba, Canada to the United States/Canadian border. NSP proposes to increase the electricity transfer capability of this transmission facility by constructing a new 80-acre substation on the existing 500 kV line in Roseau County, Minnesota, and upgrading the existing substation at Forbes, Minnesota. The proposed Roseau substation would contain two 41.5 ohm series capacitor banks. In addition, static VAR compensators are to be installed at the existing Forbes Substation. Approximately 5 acres would be added to the 30-acre Forbes site to house the additional equipment. No new lines would enter or exit the facility. NSP proposes to place the new Roseau Substation in service in May 1993 and to complete the upgrading of the Forbes Substation in March 1994. The primary, initial purpose of these modifications is to enable NSP to import 400 megawatts of electric power from MHEB during the summer months to meet peak electrical demand in the Minneapolis-St. Paul area. It is expected that this power transfer would begin in 1993.

  7. SU-E-T-548: Modeling of Breast IORT Using the Xoft 50 KV Brachytherapy Source and 316L Steel Rigid Shield

    SciTech Connect (OSTI)

    Burnside, W

    2015-06-15

    Purpose: Xoft provides a set of 316L Stainless Steel Rigid Shields to be used with their 50 kV X-ray source for Breast IORT treatments. Modeling the different shield sizes in MCNP provides information to help make clinical decisions for selecting the appropriate shield size. Methods: The Xoft Axxent 50 kV Electronic Brachytherapy System has several applications in radiation therapy, one of which is treating cancer of the breast intraoperatively by placing the miniaturized X-ray tube inside an applicator balloon that is expanded to fill the lumpectomy bed immediately following tumor removal. The ribs, lung, and muscular chest wall are all regions at risk to receive undesired dose during the treatment. A Xoft 316L Stainless Steel Rigid Shield can be placed between the intracostal muscles of the chest wall and the remaining breast tissue near the balloon to attenuate the beam and protect these organs. These shields are provided in 5 different sizes, and the effects on dose to the surrounding tissues vary with shield size. MCNP was used to model this environment and tally dose rate to certain regions of interest. Results: The average rib dose rate calculated using 0cm (i.e., no shield), 3cm, and 5cm diameter shields were 26.89, 15.43, and 8.91 Gy/hr respectively. The maximum dose rates within the rib reached 94.74 Gy/hr, 53.56 Gy/hr, and 31.44 Gy/hr for the 0cm, 3cm, and 5cm cases respectively. The shadowing effect caused by the steel shields was seen in the 3-D meshes and line profiles. Conclusion: This model predicts a higher dose rate to the underlying rib region with the 3cm shield compared to the 5cm shield; it may be useful to select the largest possible diameter when choosing a shield size for a particular IORT patient. The ability to attenuate the beam to reduce rib dose was also confirmed. Research sponsored by Xoft Inc, a subsidiary of iCAD.

  8. SU-E-J-214: Comparative Assessment On IGRT On Partial Bladder Cancer Treatment Between CT-On-Rails (CTOR) and KV Cone Beam CT (CBCT)

    SciTech Connect (OSTI)

    Lin, T; Ma, C

    2014-06-01

    Purpose: Image-Guided radiation therapy(IGRT) depends on reliable online patient-specific anatomy information to address random and progressive anatomy changes. Large margins have been suggested to bladder cancer treatment due to large daily bladder anatomy variation. KV Cone beam CT(CBCT) has been used in IGRT localization prevalently; however, its lack of soft tissue contrast makes clinicians hesitate to perform daily soft tissue alignment with CBCT for partial bladder cancer treatment. This study compares the localization uncertainties of bladder cancer IGRT using CTon- Rails(CTOR) and CBCT. Methods: Three T2N0M0 bladder cancer patients (total of 66 Gy to partial bladder alone) were localized daily with either CTOR or CBCT for their entire treatment course. A total of 71 sets of CTOR and 22 sets of CBCT images were acquired and registered with original planning CT scans by radiation therapists and approved by radiation oncologists for the daily treatment. CTOR scanning entailed 2mm slice thickness, 0.98mm axial voxel size, 120kVp and 240mAs. CBCT used a half fan pelvis protocol from Varian OBI system with 2mm slice thickness, 0.98axial voxel size, 125kVp, and 680mAs. Daily localization distribution was compared. Accuracy of CTOR and CBCT on partial bladder alignment was also evaluated by comparing bladder PTV coverage. Results: 1cm all around PTV margins were used in every patient except target superior limit margin to 0mm due to bowel constraint. Daily shifts on CTOR averaged to 0.48, 0.24, 0.19 mms(SI,Lat,AP directions); CBCT averaged to 0.43, 0.09, 0.19 mms(SI,Lat,AP directions). The CTOR daily localization showed superior results of V100% of PTV(102% CTOR vs. 89% CBCT) and bowel(Dmax 69.5Gy vs. 78Gy CBCT). CTOR images showed much higher contrast on bladder PTV alignment. Conclusion: CTOR daily localization for IGRT is more dosimetrically beneficial for partial bladder cancer treatment than kV CBCT localization and provided better soft tissue PTV

  9. Operation of Lanzhou all permanent electron cyclotron resonance ion source No. 2 on 320 kV platform with highly charged ions

    SciTech Connect (OSTI)

    Lu, W.; Li, J. Y.; Kang, L.; Liu, H. P.; Li, H.; Li, J. D.; Sun, L. T.; Ma, X. W.

    2014-02-15

    The 320 kV platform for multi-discipline research with highly charged ions is a heavy ion beam acceleration instrument developed by Institute of Modern Physics, which is dedicated to basic scientific researches such as plasma, atom, material physics, and astrophysics, etc. The platform has delivered ion beams of 400 species for 36?000 h. The average operation time is around 5000 h/year. With the beams provided by the platform, lots of outstanding progresses were made in various research fields. The ion source of the platform is an all-permanent magnet electron cyclotron resonance ion source, LAPECR2 (Lanzhou All Permanent ECR ion source No. 2). The maximum axial magnetic fields are 1.28 T at injection and 1.07 T at extraction, and the radial magnetic field is up to 1.21 T at the inner wall of the plasma chamber. The ion source is capable to produce low, medium, and high charge state gaseous and metallic ion beams, such as H{sup +}, {sup 40}Ar{sup 8+}, {sup 129}Xe{sup 30+}, {sup 209}Bi{sup 33+}, etc. This paper will present the latest result of LAPECR2 and the routine operation status for the high voltage platform.

  10. Impact Mitigation and Monitoring of the BPA 500-kV Garrison-Taft Transmission Line : Effects on Elk Security and Hunter Opportunity, Final Report.

    SciTech Connect (OSTI)

    Canfield, Jodie E.

    1988-11-01

    This study was conducted by the Montana Department of Fish, Wildlife and Parks from 1984--1988 to assess the impacts of the Garrison-Taft segment of a 500-kV powerline on elk summer-fall habitat. Construction of the powerline began in 1983, and the powerline was energized in 1985. The Garrison-Taft powerline corridor crossed 251 km of mountainous terrain in western Montana; about 465 km of new roads were constructed to provide permanent access to the powerline towers. The objectives of the study were: (1) to monitor the effectiveness of mitigation measures, including timing restrictions on construction activities and road closures on newly-built access roads, and (2) to determine if opening previously-unroaded elk security habitats to hunters by powerline access roads affected elk habitat use, distribution, use of security areas, or elk harvest. In addition, both the potential for accelerated timber harvest in areas crossed by the powerline that would not have otherwise been logged because of marginal economics and lack of haul roads and the potential effect of powerline flashovers on future prescribed burning of elk winter-ranges were evaluated. 83 refs., 88 figs., 15 tabs.

  11. Atomic and electronic structures of SrTiO3/GaAs heterointerfaces: An 80-kV atomic-resolution electron energy-loss spectroscopy study

    SciTech Connect (OSTI)

    Qiao, Q.; Klie, Robert F; Ogut, Serdar; Idrobo Tapia, Juan C

    2012-01-01

    We have examined the atomic and electronic structures of epitaxially grown, ultrathin SrTiO{sub 3} (100) films on GaAs (001) using 80-kV aberration-corrected atomic-resolution Z-contrast imaging and electron energy-loss spectroscopy (EELS) to develop a fundamental understanding of the interfacial structure-property relationships. We find that the interface is atomically abrupt and no surface reconstruction of the GaAs (001) surface is observed. Using atomic-column resolved EELS, we examine the oxygen vacancy and Ti concentrations in the SrTiO{sub 3} film and across the heterointerface. We show that Ti diffuses into the first few monolayers of GaAs. Using a combination of EELS and first-principles calculations, we present evidence for the formation of As oxides at the interface depending on the thin-film growth conditions. These findings are used to explain the differences in the transport behavior of the films.

  12. B&W Y-12 donates $2,500 to local Girl Scouts summer camp program...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    which will help fund the summer program at Camp Tanasi, located near Andersonville on Norris Lake. Joining Kammann and Johnson are (from left in photo) Rebekka Range, Anna ...

  13. 2.3-MW Medium-Voltage, Three-Level Wind Energy Inverter Applying a Unique Bus Structure and 4.5-kV Si/SiC Hybrid Isolated Power Modules: Preprint

    SciTech Connect (OSTI)

    Erdman, W.; Keller, J.; Grider, D.; VanBrunt, E.

    2014-11-01

    A high-efficiency, 2.3-MW, medium-voltage, three-level inverter utilizing 4.5-kV Si/SiC (silicon carbide) hybrid modules for wind energy applications is discussed. The inverter addresses recent trends in siting the inverter within the base of multimegawatt turbine towers. A simplified split, three-layer laminated bus structure that maintains low parasitic inductances is introduced along with a low-voltage, high-current test method for determining these inductances. Feed-thru bushings, edge fill methods, and other design features of the laminated bus structure provide voltage isolation that is consistent with the 10.4-kV module isolation levels. Inverter efficiency improvement is a result of the (essential) elimination of the reverse recovery charge present in 4.5-kV Si PIN diodes, which can produce a significant reduction in diode turn-off losses as well as insulated-gate bipolar transistor (IGBT) turn-on losses. The hybrid modules are supplied in industry-standard 140 mm x 130 mm and 190 mm x 130 mm packages to demonstrate direct module substitution into existing inverter designs. A focus on laminated bus/capacitor-bank/module subassembly level switching performance is presented.

  14. SU-E-I-07: Response Characteristics and Signal Conversion Modeling of KV Flat-Panel Detector in Cone Beam CT System

    SciTech Connect (OSTI)

    Wang, Yu; Cao, Ruifen; Pei, Xi; Wang, Hui; Hu, Liqin

    2015-06-15

    Purpose: The flat-panel detector response characteristics are investigated to optimize the scanning parameter considering the image quality and less radiation dose. The signal conversion model is also established to predict the tumor shape and physical thickness changes. Methods: With the ELEKTA XVI system, the planar images of 10cm water phantom were obtained under different image acquisition conditions, including tube voltage, electric current, exposure time and frames. The averaged responses of square area in center were analyzed using Origin8.0. The response characteristics for each scanning parameter were depicted by different fitting types. The transmission measured for 10cm water was compared to Monte Carlo simulation. Using the quadratic calibration method, a series of variable-thickness water phantoms images were acquired to derive the signal conversion model. A 20cm wedge water phantom with 2cm step thickness was used to verify the model. At last, the stability and reproducibility of the model were explored during a four week period. Results: The gray values of image center all decreased with the increase of different image acquisition parameter presets. The fitting types adopted were linear fitting, quadratic polynomial fitting, Gauss fitting and logarithmic fitting with the fitting R-Square 0.992, 0.995, 0.997 and 0.996 respectively. For 10cm water phantom, the transmission measured showed better uniformity than Monte Carlo simulation. The wedge phantom experiment show that the radiological thickness changes prediction error was in the range of (-4mm, 5mm). The signal conversion model remained consistent over a period of four weeks. Conclusion: The flat-panel response decrease with the increase of different scanning parameters. The preferred scanning parameter combination was 100kV, 10mA, 10ms, 15frames. It is suggested that the signal conversion model could effectively be used for tumor shape change and radiological thickness prediction. Supported by

  15. SU-E-J-89: Comparative Analysis of MIM and Velocity’s Image Deformation Algorithm Using Simulated KV-CBCT Images for Quality Assurance

    SciTech Connect (OSTI)

    Cline, K; Narayanasamy, G; Obediat, M; Stanley, D; Stathakis, S; Kirby, N; Kim, H

    2015-06-15

    Purpose: Deformable image registration (DIR) is used routinely in the clinic without a formalized quality assurance (QA) process. Using simulated deformations to digitally deform images in a known way and comparing to DIR algorithm predictions is a powerful technique for DIR QA. This technique must also simulate realistic image noise and artifacts, especially between modalities. This study developed an algorithm to create simulated daily kV cone-beam computed-tomography (CBCT) images from CT images for DIR QA between these modalities. Methods: A Catphan and physical head-and-neck phantom, with known deformations, were used. CT and kV-CBCT images of the Catphan were utilized to characterize the changes in Hounsfield units, noise, and image cupping that occur between these imaging modalities. The algorithm then imprinted these changes onto a CT image of the deformed head-and-neck phantom, thereby creating a simulated-CBCT image. CT and kV-CBCT images of the undeformed and deformed head-and-neck phantom were also acquired. The Velocity and MIM DIR algorithms were applied between the undeformed CT image and each of the deformed CT, CBCT, and simulated-CBCT images to obtain predicted deformations. The error between the known and predicted deformations was used as a metric to evaluate the quality of the simulated-CBCT image. Ideally, the simulated-CBCT image registration would produce the same accuracy as the deformed CBCT image registration. Results: For Velocity, the mean error was 1.4 mm for the CT-CT registration, 1.7 mm for the CT-CBCT registration, and 1.4 mm for the CT-simulated-CBCT registration. These same numbers were 1.5, 4.5, and 5.9 mm, respectively, for MIM. Conclusion: All cases produced similar accuracy for Velocity. MIM produced similar values of accuracy for CT-CT registration, but was not as accurate for CT-CBCT registrations. The MIM simulated-CBCT registration followed this same trend, but overestimated MIM DIR errors relative to the CT

  16. Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500-kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada, Northern States Power Company. Addendum to the final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

  17. Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. Addendum to the final environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

  18. 09-032 FOIA Response

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    facilities for the State of Montana, as of December 31, 2008, is as reported below. Garrison-Taft No. 1 & 2, 500 kV transmission lines 179,859,325 Broadview-Garrison No. 1 & 2...

  19. SU-E-J-13: Six Degree of Freedom Image Fusion Accuracy for Cranial Target Localization On the Varian Edge Stereotactic Radiosurgery System: Comparison Between 2D/3D and KV CBCT Image Registration

    SciTech Connect (OSTI)

    Xu, H; Song, K; Chetty, I; Kim, J; Wen, N

    2015-06-15

    Purpose: To determine the 6 degree of freedom systematic deviations between 2D/3D and CBCT image registration with various imaging setups and fusion algorithms on the Varian Edge Linac. Methods: An anthropomorphic head phantom with radio opaque targets embedded was scanned with CT slice thicknesses of 0.8, 1, 2, and 3mm. The 6 DOF systematic errors were assessed by comparing 2D/3D (kV/MV with CT) with 3D/3D (CBCT with CT) image registrations with different offset positions, similarity measures, image filters, and CBCT slice thicknesses (1 and 2 mm). The 2D/3D registration accuracy of 51 fractions for 26 cranial SRS patients was also evaluated by analyzing 2D/3D pre-treatment verification taken after 3D/3D image registrations. Results: The systematic deviations of 2D/3D image registration using kV- kV, MV-kV and MV-MV image pairs were within ±0.3mm and ±0.3° for translations and rotations with 95% confidence interval (CI) for a reference CT with 0.8 mm slice thickness. No significant difference (P>0.05) on target localization was observed between 0.8mm, 1mm, and 2mm CT slice thicknesses with CBCT slice thicknesses of 1mm and 2mm. With 3mm CT slice thickness, both 2D/3D and 3D/3D registrations performed less accurately in longitudinal direction than thinner CT slice thickness (0.60±0.12mm and 0.63±0.07mm off, respectively). Using content filter and using similarity measure of pattern intensity instead of mutual information, improved the 2D/3D registration accuracy significantly (P=0.02 and P=0.01, respectively). For the patient study, means and standard deviations of residual errors were 0.09±0.32mm, −0.22±0.51mm and −0.07±0.32mm in VRT, LNG and LAT directions, respectively, and 0.12°±0.46°, −0.12°±0.39° and 0.06°±0.28° in RTN, PITCH, and ROLL directions, respectively. 95% CI of translational and rotational deviations were comparable to those in phantom study. Conclusion: 2D/3D image registration provided on the Varian Edge radiosurgery, 6 DOF

  20. Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick

    SciTech Connect (OSTI)

    1993-10-01

    This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

  1. VISAR2KV1.0Beta

    Energy Science and Technology Software Center (OSTI)

    2001-01-01

    The software provides a rapid and robust method for reducing fringe records obtained using eithe a line-imaging optically recording velocity interferometry system (ORVIS) or stop-motion imaging of the moving fringe field. The reduced records result in spatially resolved velocity profiles of rapidly accelerating objects. Complex, time-dependent fringe motion (corresponding to local velocity variations) can be evaluated and interpreted using this program.

  2. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    generator stator windings are over 50 years old, three of the twelve in the family have failed in service, and the typical life of a winding is approximately 35 years. Of the 10...

  3. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ring. When complete, all substations and VHF sites in Oregon will be connected to the digital communications backbone, except as noted below. Analog circuits that terminate or...

  4. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    JC Microwave Upgrade This project will complete the digital conversion for the upper part of the JC communications ring. This will involve the installation of seven radio hops...

  5. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Replacement This project will upgrade the 14 governors in the McNary powerhouse with digital controls along with replacement of associated components. Governor upgrades are a...

  6. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Runner Replacements This project will refurbish the turbines and replace the turbine runners on units 1 - 16 at Chief Joseph. The drivers for this project are reliability and...

  7. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tri Cities Maintenance Headquarters This project will construct a new Tri-Cities maintenance headquarters. BPA field operations in Tri-Cities District currently occupy space in a...

  8. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Palisades Turbine Rehabilitation and Runner Replacement This project will rehabilitate the turbines and replace the turbine runners on the four units at the Palisades powerhouse....

  9. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    includes four separate capital investments at the Grand Coulee Third Power Plant (TPP): * Stator core and winding replacement on units G19 and G20 * Refurbishment of six...

  10. North Steens 230kV Transmission | Open Energy Information

    Open Energy Info (EERE)

    cut with a chainsaw. Herbaceous plants and low-growing shrubs will be left in place. All ESC measures will be in place and functioning before any construction activities occur....

  11. Hot Electron Diagnostic in a Solid Laser Target by Buried K-Shell Fluorer Technique from Ultra-Intense (3x1020W/cm2,< 500 J) Laser-Plasma Interactions on the Petawatt Laser at LLNL

    SciTech Connect (OSTI)

    Yasuike, K.; Key, M.H.; Hatchett, S.P.; Snavely, R.A.

    2000-06-29

    Characterization of hot electron production (a conversion efficiency from laser energy into electrons) in ultra intense laser-solid target interaction, using 1.06 {micro}m laser light with an intensity of up to 3 x 10{sup 20}W cm{sup -2} and an on target laser energy of {le}500 J, has been done by observing K{sub {beta}} as well as K{sub {alpha}} emissions from a buried Mo layer in the targets, which are same structure as in the previous 100 TW experiments but done under less laser intensity and energy conditions ({le} 4 x 10{sup 19} Wcm{sup -2} and {le} 30 J). The conversion efficiency from the laser energy into the energy, carried by hot electrons, has been estimated to be {approx}50%, which are little bit higher than the previous less laser energy ({approx} 20 J) experiments, yet the x-ray emission spectra from the target has change drastically, i.e., gamma flash.

  12. Materials Data on K(V5S8)2 (SG:13) by Materials Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Kristin Persson

    2015-01-21

    Computed materials data using density functional theory calculations. These calculations determine the electronic structure of bulk materials by solving approximations to the Schrodinger equation. For more information, see https://materialsproject.org/docs/calculations

  13. EA-2002: Right-of-Way Application for the Tucson-Apache 115-kV...

    Broader source: Energy.gov (indexed) [DOE]

    the potential environmental impacts of a proposal for BIA to grant Western a 150-foot right-of-way across tribal land along the existing Tucson-Apache Transmission Line to...

  14. EIS-0301: NRG Energy Services, Inc., Arizona-Baja California 500 kV Transmission Line

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to approve NRG Energy, Inc. (NRG) for a Presidential permit to construct a 500,000-volt transmission line originating at the switchyard of the Palo Verde Nuclear Generating Station near Phoenix, Arizona, and extending approximately 177 miles to the southwest, where it would cross the United States (U.S.) border with Mexico in the vicinity of Calexico, California.

  15. EIS-0091: Garrison-Spokane 500-kV Transmission Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Bonneville Power Administration (BPA) developed this statement to evaluate the environmental impacts of constructing between 254 and 271 miles of 500-kilovolt transmission line across western Montana and northern Idaho to the Spokane area in order to reinforce a section of the BPA electric power grid and to permit reliable integration of 1,240 megawatts of power produced by Colstrip Units 3 and 4, for use in Montana and throughout the Northwest.

  16. EIS-0129: New England/Hydro-Quebec 450 kV Transmission Line Interconnection- Phase II

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration issued this EIS to explore the impacts of amending Presidential Permit PP-76 to allow the Vermont Electrical Company to operate at power levels above those stipulated in the permit and to build additional transmission facilities to distribute the increased power. Phase I of this project is detailed in EIS-0103.

  17. EIS-0399: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line

    Broader source: Energy.gov [DOE]

    DOE, jointly with the Montana Department of Environmental Quality (MDEQ), prepared an EIS that evaluated the potential environmental impacts of a proposed international transmission line that would cross the U.S.-Canada border in northwest Montana.

  18. EA-1551: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line

    Broader source: Energy.gov [DOE]

    DOE started to prepare, jointly with the Montana Department of Environmental Quality (MDEQ), an EA that would also serve as a state EIS. The document would evaluate the potential environmental impacts of a proposed international transmission line that would cross the U.S.-Canada border in northwest Montana. Based on comments received on the DOE Draft EA/MDEQ Draft EIS, DOE cancelled preparation of the EA and announced preparation of DOE/EIS-0399 (of the same title).

  19. International 345 kV transmission line to Highgate, Vermont: environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1985-02-01

    The action under consideration is the issuance of a Presidential permit to the Vermont Electric Power Company, Inc. (VELCO) for the construction, operation, maintenance and connection of a facility that will cross the United States-Canada border for international transmission of electric energy. The proposed transmission facilities will consist of a 7.5 mile, alternating current (ac) transmission line and a 200 MW back-to-back direct current (dc) converter terminal station. None of the facilities will involve any polluting emissions. The construction and maintenance of the proposed converter terminal station and transmission facilities will have little or no impact on the geologic features of the region. The transmission line will have little or no effect on agricultural land. Impacts on commercial forestry in the area will be minimal. The proposed route will require clearing about 36 acres of forest. The proposed transmission line and converter terminal site will have no effect on recreational activities, mining activites, residential, commercial, or industrial land use. The proposed corridor will have a minimal impact on area terrestrial wildlife and plant communities. The proposed project will have little or no impact on future population distribution, the operation of local services, employment and economic benefit, or housing in either Franklin or Highgate. 16 references, 3 figures. (ACR)

  20. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Order No. 202-05-03, issued December 20, 2005 directing Mirant Potomac River to generate electricity at Potomac River Generating Station, PEPCO hereby files this ...

  1. EIS-0118: Proposed Eugene-Medford 500-kV Transmission Line

    Broader source: Energy.gov [DOE]

    The U.S. Department of Interior developed this statement to assess the environmental impact of a proposed 500-kilovolt transmission line linking Eugene and Medford, Oregon, that would cross through public lands. The Bonneville Power Administration (BPA) would provide service to the proposed line and is a cooperating agency in the statement. BPA adopted the EIS on 7/10/1985.

  2. EIS-0078: Jonesboro-Hergett 161-kV Transmission Line

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Southwestern Power Administration developed this statement to assess the environmental and socioeconomic impacts of a 161-kilovolt transmission line in Craighead County, Arkansas, including its proposed and alternate routes.

  3. EIS-0100: Liberty-Coolidge 230-kV Transmission Line, Arizona

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with an upgrade of electrical transmission capability between the Liberty and Coolidge Substations.

  4. Big Eddy-Knight 500 kV line nears completion with Columbia River...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    mile of line. In the crossing, there are just three towers for 1.2 miles of line with the actual river crossing spanning nine-tenths of a mile. The Oregon suspension tower stands...

  5. Cameron to Milford-138kV Transmission Line | Open Energy Information

    Open Energy Info (EERE)

    Not Indicated) for this property. proposed General Provisions: No firearms, air guns, or archery equipment would be allowed on the project sites to prevent shooting of any...

  6. Materials Data on KV4O8 (SG:87) by Materials Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Kristin Persson

    2014-11-02

    Computed materials data using density functional theory calculations. These calculations determine the electronic structure of bulk materials by solving approximations to the Schrodinger equation. For more information, see https://materialsproject.org/docs/calculations

  7. Prototype Development Progress Toward a 500 kV Solid State Marx Modulator

    SciTech Connect (OSTI)

    Leyh, G.

    2004-07-27

    Recent advances in IGBT and SiC technology have made possible a range of solid-state modulator concepts that were unthinkable a decade ago. Power densities and speeds of pulsed-power circuits have increased dramatically due to the commercial introduction of fast, multi-kilovolt IGBT silicon and SiC diodes featured in PCB-style packages. A solid-state modulator concept that stands to benefit considerably from recent IGBT and SiC breakthroughs is the Marx configuration--where an array of stacked modules generates high-voltage output pulses directly from a low voltage DC supply. The Marx scheme avoids the large, inefficient and costly magnetic cores inherent in standard modulator designs, resulting in a considerably simpler, cheaper and more compact mechanical solution. The main disadvantage to this approach is that the individual cells in a Marx bank must float at high voltages during the pulse, complicating the distribution of power and timing signals. This paper examines in closer detail the practical advantages and pitfalls of a solid-state Marx configuration, and explores a design approach with emphasis on performance, wall-plug efficiency, cost of manufacture, availability and ease of service. The paper presents electrical diagrams, mechanical CAD layout and preliminary prototype test data.

  8. Notification of Planned 230kV Outage at Potomac River Generating Station

    Office of Energy Efficiency and Renewable Energy (EERE)

    Docket No. EO-05-01. The next planned outage on xxxxx high voltage circuit between xxxxx and xxxxx is tentatively scheduled for Saturday May 19, 2007 and will begin at 4:00 AM with a scheduled...

  9. Notification of Planned 230kV Outage at Potomac River Generating...

    Energy Savers [EERE]

    Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. ...

  10. Characterization of the CEBAF 100 kV DC GaAs Photoelectron Gun Vacuum System

    SciTech Connect (OSTI)

    M.L. Stutzman; P. Adderley; J. Brittian; J. Clark; J. Grames; J. Hansknecht; G.R. Myneni; M. Poelker

    2007-05-01

    A vacuum system with pressure in the low ultra-high vacuum (UHV) range is essential for long photocathode lifetimes in DC high voltage GaAs photoguns. A discrepancy between predicted and measured base pressure in the CEBAF photoguns motivated this study of outgassing rates of three 304 stainless steel chambers with different pretreatments and pump speed measurements of non-evaporable getter (NEG) pumps. Outgassing rates were measured using two independent techniques. Lower outgassing rates were achieved by electropolishing and vacuum firing the chamber. The second part of the paper describes NEG pump speed measurements as a function of pressure through the lower part of the UHV range. Measured NEG pump speed is high at pressures above 510^?11 Torr, but may decrease at lower pressures depending on the interpretation of the data. The final section investigates the pump speed of a locally produced NEG coating applied to the vacuum chamber walls. These studies represent the first detailed vacuum measurements of CEBAF photogun vacuum chambers.

  11. EIS-0112: Rifle to San Juan 345-kV Transmission Line and Associated Facilities

    Broader source: Energy.gov [DOE]

    The U.S. Department of Agriculture - Rural Electrification Administration developed this statement to evaluate the environmental impacts of the Colorado-Ute Electric Association Inc. and the U.s. Department of Energy's Western Area Power Administration (WAPA) constructing and operating a 345-kilovolt transmission line from Rifle, Colorado, to the San Juan Generating Station near Farmington, New Mexico. WAPA served as a cooperating agency in the preparation of this statement and adopted it on 10/30/1984. WAPA assumed the lead role for project implementation after issuance of the final statement.

  12. EIS-0103: New England/Hydro-Quebec 450-kV Direct Current Transmission Line Interconnection

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Economic Regulatory Administration prepared this statement to evaluate the environmental impacts of the construction, maintenance, and operation of a 57-mile transmission line from Monroe, New Hampshire, to the U.S./Canadian border for the purpose of economic exchange of power and increased reliability. Phase 2 of this project is detailed in EIS-0129.

  13. KvH Projekt GmbH Co KG | Open Energy Information

    Open Energy Info (EERE)

    Zip: D-20259 Sector: Biomass, Solar, Wind energy Product: Project developer in wind, solar, biomass and smart architecture. Coordinates: 53.553345, 9.992455 Show Map Loading...

  14. EIS-0011: New Melones 230-kV Electrical Transmission Line, Central Valley Project, California

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy's Western Area Power Administration prepared this statement to evaluate the environmental impacts of proposed development of an electrical transmission system for the New Melones Power Plant.

  15. PP-28 The Northern Electric Cooperative | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Canada border. PDF icon PP-28 The Northern Electric Cooperative More Documents & Publications PP-10 Bonneville Power Administrator PP-10-1 Bonneville Power Administrator PP-29-1 ...

  16. New Switches for Utility-Scale Inverters: First In-Class Demonstration of a Completely New Type of SiC Bipolar Switch (15kV-20kV) for Utility-Scale Inverters

    SciTech Connect (OSTI)

    2011-12-31

    Solar ADEPT Project: The SiCLAB is developing a new power switch for utility-scale PV inverters that would improve the performance and significantly reduce the size, weight, and energy loss of PV systems. A power switch controls the electrical energy flowing through an inverter, which takes the electrical current from a PV solar panel and converts it into the type and amount of electricity that is compatible with the electric grid. SiCLAB is using silicon carbide (SiC) semiconductors in its new power switches, which are more efficient than the silicon semiconductors used to conduct electricity in most conventional power switches today. Switches with SiC semiconductors can operate at much higher temperatures, as well as higher voltage and power levels than silicon switches. SiC-based power switches are also smaller than those made with silicon alone, so they result in much smaller and lighter electrical devices. In addition to their use in utility-scale PV inverters, SiCLABs new power switches can also be used in wind turbines, railways, and other smart grid applications.

  17. EIS-0079: 300-kV International Submarine Transmission Line- Erie, Pennsylvania to Nanticoke, Ontario, Canada General Public Utilities Corporation

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy Office of Energy Emergency Operations developed this statement to assess the potential environmental and socioeconomic impacts of the construction and operation of 44 miles of cable between the Erie West Substation and the Canadian border.

  18. EA-1899: Rerouting and Renovating of Estes-Flatiron Three Transmission Lines to Double Circuit 115-kV, Larimer County, Colorado

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration started to prepare an EA to evaluate the environmental impacts of a proposal to reroute and renovate the Estes-Flatiron Three Transmission Lines in Larimer County, Colorado. Based on comments received during the scoping period, Western ended preparation of DOE/EA-1899 and announced its intent to prepare and environmental impact statement, DOE/EIS-0483.

  19. Volume II solicitation package for solicitation no. 522887-5422 {open_quotes}site electrical replacements & substation{close_quotes} subproject: 69 KV substation

    SciTech Connect (OSTI)

    1991-05-03

    This solicitation is for the U.S. Department of Energy under Prime Contract No. DE-AC04-88-DP43495 with EG&G Mound Applied Technologies. Ohio Sales or Use taxes are not to be included in the proposal price. Applicable taxes due or owing to the State of Ohio will be paid by the buyer under Direct Payment Permit No. 98-002230. Refer to Form ML-2487, General Provisions, Article 24, {open_quotes}Federal, State & Local Taxes{close_quotes}. Sellers are advised that purchases of building and construction materials for incorporation into a structure or improvement to a real property which is accepted for ownership by the United States or one of its agencies are exempt from Ohio Sales and Use taxes. Unnecessarily elaborate brochures or other presentations beyond those sufficient to present a complete and effective response to this solicitation are not desired and may be construed as an indication of the seller`s lack of cost consciousness. Elaborate art work, expensive paper and binding, and expensive visual and other presentation aids are neither necessary nor wanted.

  20. EIS-0032: 500 kV International Transmission Line NSP-TR-1, Forbes, Minnesota to Manitoba, Canada, Northern States Power Company

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration developed this EIS to evaluate the environmental impacts of a 500-kilovolt transmission line proposed by the Northern States Power Company to provide a transmission facility for the exchange of electrical energy between Canada and the United States.

  1. EA-0587: Proposed Amendment to Presidential Permit PP-63 and Associated Modification to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of Northern States Power Company's  proposal to expand the Forbes Substation in Minnesota.

  2. EIS-0339: Presidential Permit Application, GenPower 500 kV Submarine Electric Transmission Cable from Nova Scotia to New York

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) announced its intent to prepare an Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act of 1969 (NEPA) for GenPower New York, L.L.C.’s (GenPower) request for a Presidential permit for a proposed international electric transmission line.

  3. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  4. EA-2002: Right-of-Way Application for the Tucson-Apache 115-kV Transmission Line, Pima County, Arizona

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) and the Bureau of Indian Affairs (BIA), as joint lead agencies, prepared an EA that evaluates the potential environmental impacts of a proposal for BIA to grant Western a 150-foot right-of-way across tribal land along the existing Tucson-Apache Transmission Line to replace the previous 100-foot right-of-way, which has expired.

  5. EIS-0067: 230-kV International Transmission Line San Diego County, California to Tijuana, Mexico, San Diego Gas and Electric Company

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration and the California Public Utilities Commission jointly prepared this EIS to evaluate the environmental impacts of the construction, maintenance and operation of a 10-mile, 230-kilovolt transmission line across the U.S./Mexico border for the purpose of economic exchange of power and increased reliability.

  6. EIS-0365: Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines, EIS-0365 (May 2004)

    Broader source: Energy.gov [DOE]

    A U.S. Department of Energy (DOE) Presidential permit is required to construct an electric transmission line across the U.S. international border. On February 27, 2001, Baja California Power, Inc. ...

  7. Accident Investigation of the July 30, 2013, Electrical Fatality on the Bandon-Rogue No. 1 115kV Line at the Bonneville Power Administration

    Broader source: Energy.gov [DOE]

    This report is an independent product of the Level I Accident Investigation Board appointed by Brad Bea, Chief Safety Officer, Bonneville Power Administration. The Board was appointed to perform a Level I Accident Investigation and to prepare an investigation report in accordance with Bonneville Power Administration Manual, Chapter 181, Accident Investigation and Reporting.

  8. Slide 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Krendale 138kV to Seneca 138kV Congestion slightly increases each study year. Will monitor in future analysis. WESTERN Congestion increases each study year. COOPER 230kV to Peach ...

  9. EIS-0436: I-5 Corridor Reinforcement Project; Multnomah County...

    Office of Environmental Management (EM)

    proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation...

  10. EIS-0436: Notice of Intent to Prepare an Environmental Impact...

    Energy Savers [EERE]

    proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation...

  11. Property:ProjectName | Open Energy Information

    Open Energy Info (EERE)

    Showing 25 pages using this property. (previous 25) (next 25) 0 0.4 kV remote control (Smart Grid Project) + 0.4 kV remote control + 2 220 kV SSSC device for power flow...

  12. EIS-0285-SA-112: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Vegetation Management Program Vegetation Management for portions of the Ross-Alcoa transmission lines 230kV & 115kV and Bonneville-Alcoa 115kV PDF icon Supplement...

  13. EIS-0323-S1: Draft Supplement Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (kV) transmission line between Western's O'Banion Substation and the area just south of SMUD's Elverta Substation and the reconstruciton of SMUD's existing 230-kV115kV ...

  14. EIS-0436: I-5 Corridor Reinforcement Project; Multnomah County...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near Troutdale, Oregon. ...

  15. EIS-0436: Notice of Intent to Prepare an Environmental Impact...

    Energy Savers [EERE]

    500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near Troutdale, Oregon. ...

  16. EIS-0436: EPA Notice of Availability of Final Environmental Impact...

    Energy Savers [EERE]

    500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near Troutdale, Oregon. ...

  17. EIS-0436: Draft Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near Troutdale, Oregon. ...

  18. News Item

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FIB Specifications Ion column Electron column Accel. voltage 10-30 kV 0.2 - 30 kV Resolution 7 nm 3 nm

  19. EIS-0285-SA-118: Supplement Analysis

    Broader source: Energy.gov [DOE]

    Transmission System Vegetation Management Program, Holcomb-Naselle 115kV, Pacific County, Washington

  20. Utility-Scale Solar Power Converter: Agile Direct Grid Connect Medium Voltage 4.7-13.8 kV Power Converter for PV Applications Utilizing Wide Band Gap Devices

    SciTech Connect (OSTI)

    2012-01-25

    Solar ADEPT Project: Satcon is developing a compact, lightweight power conversion device that is capable of taking utility-scale solar power and outputting it directly into the electric utility grid at distribution voltage levels—eliminating the need for large transformers. Transformers “step up” the voltage of the power that is generated by a solar power system so it can be efficiently transported through transmission lines and eventually “stepped down” to usable voltages before it enters homes and businesses. Power companies step up the voltage because less electricity is lost along transmission lines when the voltage is high and current is low. Satcon’s new power conversion devices will eliminate these heavy transformers and connect a utility-scale solar power system directly to the grid. Satcon’s modular devices are designed to ensure reliability—if one device fails it can be bypassed and the system can continue to run.

  1. Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

    Office of Energy Efficiency and Renewable Energy (EERE)

    Docket No. EO-05-01. Order No. 202-07-02: Pursuant to the Department of Energy's Order No. 202-05-3 issued December 20, 2005 ("DOE Potomac River Order"), Pepco has filed notice of the planned...

  2. Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

    Broader source: Energy.gov [DOE]

    Docket EO-05-01: Pursuant to the United States Department of Energy ("DOE") Order No. 202-05-3, issued December 20, 2005 ("DOE Potomac River Order") Pepco hereby files this revised notice of the...

  3. President�s Energy Budget Invests in Innovation, Clean Energy, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Presidential Permits Presidential Permits Below is a listing of all the presidential permits grouped by Canada and Mexico. View the Presidential Permits - Canada View the Presidental Permits - Mexico PRESIDENTIAL PERMITS - CANADA BACK TO TOP Docket No. Company Date Issued PP-6 Puget Sound Energy 04/28/81 PP-10 BPA 10/27/45 PP-10-1 BPA 11/30/65 PP-11-2 Fraser Papers 02/29/99 PP-11 Fraser Papers (Rescinded in PP-366) 11/18/10 PP-12 Maine 12/05/63 PP-13 NiMo Hogansburg 01/31/48 PP-18 Glacier

  4. Presidential Permits | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presidential Permits Presidential Permits Below is a listing of all the presidential permits grouped by Canada and Mexico. View the Presidential Permits - Canada View the Presidental Permits - Mexico PRESIDENTIAL PERMITS - CANADA BACK TO TOP Docket No. Company Date Issued PP-6 Puget Sound Energy 04/28/81 PP-10 BPA 10/27/45 PP-10-1 BPA 11/30/65 PP-11-2 Fraser Papers 02/29/99 PP-11 Fraser Papers (Rescinded in PP-366) 11/18/10 PP-12 Maine 12/05/63 PP-13 NiMo Hogansburg 01/31/48 PP-18 Glacier

  5. Department of Energy Offers Severstal Dearborn, LLC a $730 Million Conditional Loan Commitment for Michigan Project

    Broader source: Energy.gov [DOE]

    Project Expected to Generate Over 2,500 Jobs and Manufacture Advanced Steel to Improve Fuel Efficiency

  6. Workplace Charging Challenge Partner: Snohomish County

    Broader source: Energy.gov [DOE]

    Joined the Challenge: March 2016Headquarters: Everett, WACharging Locations:Everett, WA; Snohomish, WA; Monroe, WADomestic Employees: 2,500

  7. Untitled Document

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    voltage, WD 3mm). Accelerating voltage can vary continuously from 0.5 kV for resist imaging to 30 kV for EDS detection and metallic surface imaging. Stage motion ranges: X: 0...

  8. EIS-0183: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Goodnoe Hills and White Creek Wind Energy Projects The Bonneville Power Administration ... (kV) substation along BPA's Wautoma - John Day No.1 500-kV transmission line. ...

  9. Microsoft Word - MITSUBISHI ELECTRIC Comments DOE RFI National...

    Energy Savers [EERE]

    ... reserve program are critical Extra-High Voltage (EHV) transformer applications with a high voltage rating of 230 kV and above, up to and including 765 kV class applications. ...

  10. Property:AwardeeHeadquarters | Open Energy Information

    Open Energy Info (EERE)

    Showing 25 pages using this property. (previous 25) (next 25) 0 0.4 kV remote control (Smart Grid Project) + Denmark + 2 220 kV SSSC device for power flow control (Smart...

  11. Property:TimePeriod | Open Energy Information

    Open Energy Info (EERE)

    Showing 25 pages using this property. (previous 25) (next 25) 0 0.4 kV remote control (Smart Grid Project) + Not available + 2 220 kV SSSC device for power flow control...

  12. Microsoft Word - Cover Page - Exhibit 5

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    115 120 125 130 135 140 145 150 155 Structure Quantity Structure Height EXHIBIT 5 Project Structure Height Breakdown - HVDC & 345-kV HVDC Structures 345-kV Structures 27-JUN-2013

  13. Baoding Tianwei Baobian Electric Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    activities are the manufacture and sale of 500, 330, 220, 110kV or under 100kV transformers, also has subsidiaries in integrated PV manufacture and wind turbine manufacture....

  14. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Alvey Substation 500kV Shunt Reactor Addition This project will install a 500kV shunt reactor at the Alvey switching station. The addition of the shunt reactor is intended to lower...

  15. US Contribution

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The steady state electrical network is an AC power substation and distribution system that ... Power feeds: 4 * 2 feeds: 400 kV substation transformer, 22 kV distribution to load ...

  16. EIS-0451: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (kV) transmission line and a 138115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's ...

  17. NWTC Controllable Grid Interface (Fact Sheet), National Wind...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Controllable Grid Interface (CGI) for grid and fault simulation (7 MVA - under development) Xcel substation 13.8 kV 115 kV CGI bus NWTC wind turbines Alstom 3 MW Siemens 2.3 MW GE ...

  18. EIS-0399: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line Montana Alberta Tie Ltd. 230-kV transmission line...

  19. EIS-0505: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

  20. EIS-0032: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    500 kV International Transmission Line NSP-TR-1, Forbes, Minnesota to Manitoba, Canada, Northern States Power Company

  1. EA-1679: Mitigation Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

  2. EA-1679: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

  3. EA-1679: Revision Sheet for Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Grand Coulee’s Third Power plant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

  4. EA-1863: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Vegetation Management Plan for Glen Canyon to Pinnacle Peak 345-kV transmission line, Coconino National Forest, Arizona

  5. EA-1357: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Presidential Permit PP-26, Brownsville Public Utilities Board, Brownsville to Mexico 138 kV Transmission Line Project, Brownsville, Texas

  6. EA-1595: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Davis-Mead 230-kV Transmission Line Reconductor Project, Mohave County, Arizona and Clark County, Nevada

  7. EIS-0505: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

  8. EIS-0505: Notice of Intent to Prepare Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington

  9. EIS-0505: Supplemental Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

  10. EA-1863: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Vegetation Management Plan for Glen Canyon to Pinnacle Peak 345-kV transmission line, Coconino National Forest, Arizona

  11. EA-1679: Preliminary Environmental Assessment

    Broader source: Energy.gov [DOE]

    Grand Coulee’s Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

  12. EIS-0067: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    230-kV International Transmission Line San Diego County, California to Tijuana, Mexico, San Diego Gas and Electric Company

  13. EIS-0025: Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Miles City-New Underwood 230-kV Electrical Transmission Line, Montana, North Dakota, and South Dakota

  14. EIS-0436: I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington

    Broader source: Energy.gov [DOE]

    DOE’s Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a BPA proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near Troutdale, Oregon.

  15. Itaipu network spans all EHV voltages

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    The large Itaipu hydroelectric project on the Brazil-Paraguay border called for the construction of an interrelated network of 345-kV, 500-kV, 750-kV, and HVDC lines and substations on an unprecedented scale. The civil engineering and the electrical design are discussed.

  16. CX-008714: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV), Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

  17. Paper Title (use style: paper title)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... secondary system, often using standard transformer impedances by kVA size and 100 feet of ... to 25kV 25kV to 35kV Fig. 12. CDF of feeder hosting capacity separated by voltage class. ...

  18. EIS-0323-S1: Sacramento Area Voltage Support Project Supplemental Environmental Impact Statement and Environmental Impact Report, Placer, Sacramento, and Sutter Counties, California

    Office of Energy Efficiency and Renewable Energy (EERE)

    Construction and operation has been proposed of approximately 31 to 38 miles of new, double-circuit, 230-kilovolt (kV) transmission line between Western's O'Banion Substation and the area just south of SMUD's Elverta Substation and the reconstruciton of SMUD's existing 230-kV/115kV transmission line between SMUD's Elverta and Natomas substations.

  19. Liquid Argon Dielectric Strength Measurements Sarah Lockwitz

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Argon Dielectric Strength Measurements Sarah Lockwitz Fermilab LArTPC R&D Workshop July, 9 2014 Fermilab LAr Dielectric Strength July 9, 2014 S. Lockwitz et al. Recent Interest in LAr High Voltage (HV) 2 Experiment Voltage ICARUS 75 kV Darkside 50 60 kV MicroBooNE 128 kV CAPTAIN 50 kV LBNE 170 kV GLACIER 1-2 MV LAr Dielectric Strength July 9, 2014 S. Lockwitz et al. Recent Interest in LAr High Voltage (HV) * Noble liquids are becoming a popular detector medium 2 Experiment Voltage ICARUS 75

  20. CD-3, Approve Start of Construction/Execution | Department of Energy

    Office of Environmental Management (EM)

    CCPG Update U.S. Department Of Energy 2012 National Electric Transmission Congestion Study Workshop - Portland, OR December 13, 2011 Susan Henderson, P.E. Xcel Energy Path/TOT Ratings  TOT 1A - none  TOT 2A - none  TOT 3 ◦ Archer-Wayne Child Interconnection (150MW, 345kV) ◦ High Plains Express (500kV, 1600-8000MW) ◦ Zephyr (500kV DC, 3000MW) ◦ TransWest Express (600kV DC, 3000MW) ◦ Colorado-Wyoming Intertie (345kV, 800MW)  Reference: WECC Path Reports & Rating Catalog

  1. CCPG Update U.S. Department Of Energy 2012 National Electric Transmission Congestion

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CCPG Update U.S. Department Of Energy 2012 National Electric Transmission Congestion Study Workshop - Portland, OR December 13, 2011 Susan Henderson, P.E. Xcel Energy Path/TOT Ratings  TOT 1A - none  TOT 2A - none  TOT 3 ◦ Archer-Wayne Child Interconnection (150MW, 345kV) ◦ High Plains Express (500kV, 1600-8000MW) ◦ Zephyr (500kV DC, 3000MW) ◦ TransWest Express (600kV DC, 3000MW) ◦ Colorado-Wyoming Intertie (345kV, 800MW)  Reference: WECC Path Reports & Rating Catalog

  2. Final joint environmental assessment for the construction and routine operation of a 12-kilovolt (KV) overhead powerline right-of-way, and formal authorization for a 10-inch and 8-inch fresh water pipeline right-of-way, Naval Petroleum Reserve No. 1, Kern County, California

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    The purpose and need of the proposed action, which is the installation of an overhead powerline extension from an Naval Petroleum Reserve No. 1 (NPR-1) power source to the WKWD Station A, is to significantly reduce NPR-1`s overall utility costs. While the proposed action is independently justified on its own merits and is not tied to the proposed NPR-1 Cogeneration Facility, the proposed action would enable DOE to tie the NPR-1 fresh water pumps at Station A into the existing NPR-1 electrical distribution system. With the completion of the cogeneration facility in late 1994 or early 1995, the proposed action would save additional utility costs. This report deals with the environmental impacts of the construction of the powerline and the water pipeline. In addition, information is given about property rights and attaining permission to cross the property of proposed affected owners.

  3. Type A Accident Investigation Report – Western Area Power Administration Investigation of the June 7, 2004, Construction Contractor Electrical Accident at Double-Circuit Structure 38/1, Watertown-Granite Falls 230-kV Transmission Line East of Watertown, S

    Broader source: Energy.gov [DOE]

    This report is an independent product of the Type A Accident Investigation board appointed by Timothy J. Meeks, Chief Operating Officer, Western Area Power Administration.

  4. EIS 0026: Revision of the Record of Decision | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to 2,500 cubic meters of transuranic (TRU) waste containing polychlorinated biphenyls (PCBs) in concentrations of 50 parts per million (ppm) or greater at the Waste Isolation...

  5. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Idle Reduction Technology Rebates The North Carolina Department of Environment and Natural Resources (NCDENR) offers rebates of up to 2,500 for approved idle reduction...

  6. Italsilicon Srl | Open Energy Information

    Open Energy Info (EERE)

    search Name: Italsilicon Srl Place: Brugherio, Italy Zip: 20047 Sector: Solar Product: Italian joint venture to manufacture 2,500t worth of solar-grade silicon. Coordinates:...

  7. Alternative Fuels Data Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electric Vehicle Supply Equipment (EVSE) Rebate - Indiana Michigan Power Indiana Michigan Power provides rebates of up to 2,500 to residential customers who purchase or lease a...

  8. Building America Technology Solutions for New and Existing Homes...

    Broader source: Energy.gov (indexed) [DOE]

    Research Facility (CRRF) in northern Minnesota, which features more than 2,500 ft2 of ... Retrofits for Cold Climates, Cloquet, Minnesota Building America Technology Solutions ...

  9. Project Award Spreadsheets 2010 12 21 1232.xlsx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Western Governors' Association 12,000,000 Electric Reliability Council of Texas (ERCOT) 2,500,000 Electric Reliability Council of Texas (ERCOT) for work with Texas government ...

  10. Optimizing the CEBAF Injector for Beam Operation with a Higher Voltage Electron Gun

    SciTech Connect (OSTI)

    F.E. Hannon, A.S. Hofler, R. Kazimi

    2011-03-01

    Recent developments in the DC gun technology used at CEBAF have allowed an increase in operational voltage from 100kV to 130kV. In the near future this will be extended further to 200kV with the purchase of a new power supply. The injector components and layout at this time have been designed specifically for 100kV operation. It is anticipated that with an increase in gun voltage and optimization of the layout and components for 200kV operation, that the electron bunch length and beam brightness can be improved upon. This paper explores some upgrade possibilities for a 200kV gun CEBAF injector through beam dynamic simulations.

  11. PREPARED STATEMENT OF INᅢノS R. TRIAY

    Office of Environmental Management (EM)

    03 Federal Power Commission PP-03 Federal Power Commission Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission facilities at te U.S-Mexico border. PP-03 Federal Power Commission (572.1 KB) More Documents & Publications PP-35 Trico Electric Cooperative Inc PP-285 Sharyland Utilities LP PP-107-1 Arizona Public Service Company

    Bonneville Power Administrator PP-10 Bonneville Power Administrator Presidential permit authorizing

  12. PP-6 Puget Sound Power & Light Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Puget Sound Power & Light Company PP-6 Puget Sound Power & Light Company Presidential permit authorizing Puget Sound Power & Light Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. - Signed 4/28/1981 PP-6 Puget Sound Power & Light Company (1.07 MB) More Documents & Publications PP-29-1 Maine Public Service Company PP-12 Maine Public Service Company PP-10 Bonneville Power Administrator

  13. EIS-0436: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Impact Statement EIS-0436: Final Environmental Impact Statement I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington DOE's Bonneville Power Administration (BPA) issued a Final EIS that evaluates the potential environmental impacts of a BPA proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near

  14. Isolated trigger pulse generator

    DOE Patents [OSTI]

    Aaland, K.

    1980-02-19

    A trigger pulse generation system capable of delivering a multiplicity of isolated 100 kV trigger pulses with picosecond simultaneity. 2 figs.

  15. EIS-0486: Plains & Eastern Clean Line Transmission Project |...

    Broader source: Energy.gov (indexed) [DOE]

    Project. The proposed project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the...

  16. EIS-0285-SA-149: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission System Vegetation Management Program Vegetation Management for the Captain Jack-Malin 1 500 kV transmission line from structure 24 to Malin Substation (reference...

  17. TransWest | Open Energy Information

    Open Energy Info (EERE)

    General NEPA Document Info Environmental Analysis Type EIS Applicant Western Power Administration Transmission Type 600kV Project Area Wyoming Time Frame (days) Participating...

  18. EA-1611: Mitigation Action Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    LLC applied to Western Area Power Administration to interconnect a 90-megawatt wind power facility with Western's existing Sterling-Frenchman Creek 115-kV transmission line....

  19. EIS-0344: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington and implement the proposed action...

  20. EIS-0005-FS: Draft Supplemental Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental

  1. EA-0587: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Proposed Amendment to Presidential Permit PP-63 and Associated Modification to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada

  2. ANUEADflM-31 Electric Power High-Voltage Transmission Lines:

    Office of Scientific and Technical Information (OSTI)

    ......... 42 26 Underground Configuration for 230-kV ac ... Empire State Electric Energy Research .Gorp. Energetics, Inc. Florida Electric Power ...

  3. EIS-0005-FS: Final Supplemental Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental

  4. NETL F 451.1/1-1, Categorical Exclusion Designation Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sacramento, CA None OEOEPMEDTD Ryan Watson SMUD Resilient Grid Initiative Install SCADA switches on 69 kV circuits for automatic sectionalizing and fault location and install...

  5. EIS-0505: EPA Notice of Availability of Supplemental Draft Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0505: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, ...

  6. EIS-0285-SA-132: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Vegetation Management Program Vegetation Management for portion of the Big Eddy - Ostrander 1 500 kV transmission line located from tower structure 312 to 393...

  7. EIS-0325: Schultz-Hanford Area Transmission Line Project, WA

    Broader source: Energy.gov [DOE]

    BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

  8. Karren L. More, Ph.D. Leader, Microscopy Group Oak Ridge National...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    with single atom sensitivity Instrument Specifications: * Cold field emission gun * 3 rd generation C 3 C 5 aberration corrector * 60-100kV operation * <1 spatial ...

  9. _Dear Reader_Cover Sheet_Master Table of Contents

    Energy Savers [EERE]

    ... electrical grid). The potential environmental impacts resulting from connected actions (wind energy generation and ... 600kV Lattice Crossing Structure Figure 2.1-26: AC ...

  10. RAPID/Geothermal/Transmission Siting & Interconnection/Utah ...

    Open Energy Info (EERE)

    of 230 kV. The line must be located on state land for this to apply. Public Utility Definition for Transmission Facility: "Public utilities" include "electric corporations,"...

  11. RAPID/Geothermal/Transmission Siting & Interconnection/Idaho...

    Open Energy Info (EERE)

    Commission (PUC). 12 Transmission Siting Threshold: NIETC - 115kV Public Utility Definition for Transmission Facility: The term "public utility" includes every common...

  12. EA-1595: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EA-1595: Mitigation Action Plan Davis-Mead 230-kV Transmission Line Reconductor Project Western Area Power Administration proposes to reconductor ...

  13. Bureau of Land Management’s Environmental Assessment

    Broader source: Energy.gov [DOE]

    T G Power LLC Hot Sulphur Springs Transmission Line, 120 kV Electric Power Line, Northern Independence Valley, Elko County, Nevada

  14. EA-0587: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Proposed Amendment to Presidential Permit PP-63 and Associated Modification to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada

  15. Vietnam-World Bank Climate Projects | Open Energy Information

    Open Energy Info (EERE)

    electricity access will be improved by upgrading, and strengthening the 110 KV sub-transmission line, and substations, restoring five existing hydropower plants, and, by...

  16. Searchlight Wind Energy Project FEIS Appendix A

    Office of Environmental Management (EM)

    Area Power Administration Substation) Prepared for: U.S. Department of Interior Bureau of Land Management Las ... GIS geographic information system kV kilovolt MW megawatt ...

  17. Design requirements document for the phase 1 privatization electrical power system

    SciTech Connect (OSTI)

    Singh, G.

    1997-10-31

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract.

  18. EIS-0486: DOE Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The proposed project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to ...

  19. Price hub","Trade date","Delivery start date","Delivery

    U.S. Energy Information Administration (EIA) Indexed Site

    373,42373,23.75,23.75,23.75,2.52,800,1,2 "ERCOT North 345KV Peak","application/vnd.ms-excel",42374,42374,22.75,22.5,22.63,-1.12,1600,2,2 "ERCOT North 345KV Peak","application/vnd.ms-excel",42375,42375,20,19.75,19.81,-2.82,14400,15,10 "ERCOT North 345KV Peak","application/vnd.ms-excel",42376,42376,19,18.5,18.61,-1.2,16000,20,9 "ERCOT North 345KV

  20. Comments from the Virginia Department of Environmental Quality...

    Broader source: Energy.gov (indexed) [DOE]

    Quality (DEQ) strongly opposes the Potomac Electric Power Company's (PEPCO) intention to commence planned maintenance outages of the 230kV transmission lines that serve the ...

  1. Comments from the Virginia Department of Environmental Quality...

    Energy Savers [EERE]

    transmission outages of the 230kV transmission lines that serve the Potomac River Substation on January 9, 2006. Comments from the Virginia Department of Environmental Quality ...

  2. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partnership September 1, 2008 EIS-0399: Final Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line August 29, 2008 EIS-0370: Draft...

  3. EIS-0399: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0399: Draft Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line MATL proposes to construct and operate a...

  4. ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION

    Office of Environmental Management (EM)

    ... (e) Plumbing, electrical utility, lighting, and ... calibration of facility components, subsystems, or pmtable ... No. 3) 345-kV Transmission Line and Curecanti-Lost Canyon ...

  5. ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION

    Office of Environmental Management (EM)

    ... (e) Plumbing, electrical utility, lighting, and ... 230-kV Transmission Line Cross Bar Ranch Project (j) ... calibration of facility components, subsystems, or portable ...

  6. Isolated trigger pulse generator

    DOE Patents [OSTI]

    Aaland, Kristian (Livermore, CA) [Livermore, CA

    1980-02-19

    A trigger pulse generation system capable of delivering a multiplicity of isolated 100 kV trigger pulses with picosecond simultaneity.

  7. EA-1863: Draft Environmental Assessment

    Broader source: Energy.gov [DOE]

    Glen Canyon to Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project within the Coconino National Forest, Flagstaff, Arizona

  8. Bonneville upgrades lines

    SciTech Connect (OSTI)

    Not Available

    1993-08-30

    A stretch of Bonneville Power Administration transmission line between Spokane and the Grand Coulee Dam is an 82-mile bottleneck as it is the last 115-kv section of [open quotes]road[close quotes] along a 500-kv transmission [open quotes]highway[close quotes]. Soon the administration will change all that. A number of independent and utility powerplants have been proposed in Idaho, Montana and the Spokane, Wash., area during the 1990s. As the operators will need to move their power, Bonneville is planning to build a $144-million, 500-kv line to upgrade the 115-kv section. The agency is planning to use its existing right-of-way.

  9. EIS-0451: Hooper Springs Transmission Project, Caribou County...

    Broader source: Energy.gov (indexed) [DOE]

    DOE's Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line from BPA's...

  10. EIS-0344: Draft Envrionmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Coulee - Bell 500-kV Transmission Line Project This Environmental Impact Statement (EIS) discloses the potential impacts associated with construction and operation of the proposed...

  11. Bordertown to California Transmission | Open Energy Information

    Open Energy Info (EERE)

    Transmission EIS Bordertown to California 120kV Transmission Line Project Environmental Impact Statement General NEPA Document Info Energy Sector Transmission Environmental...

  12. EIS-0294: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    (kV) transmission line, approximately 3.5 miles in length, known as the Sutter Power Plant (SPP). DOEEIS-0294, Department of Energy, Western Area Power Administration,...

  13. FIGS-3&4.CHP:Corel VENTURA

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    S3. Crude Oil Supply and Disposition, Figure S4. Crude Oil Ending Stocks, 1 0 2,500 5,000 7,500 10,000 12,500 15,000 17,500 0 2,500 5,000 7,500 10,000 12,500 15,000 17,500 Jul Aug...

  14. CX-007736: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Rutgers University - First in Class Demonstration of Completely New type of SiC Bipolar Switch (15 kilovolt (kV)-20kV) for Utility Scale Inverters CX(s) Applied: A9, B3.6 Date: 12/08/2011 Location(s): New Jersey Offices(s): Advanced Research Projects Agency-Energy

  15. Price hub","Trade date","Delivery start date","Delivery

    U.S. Energy Information Administration (EIA) Indexed Site

    42009,42009,40,39,39.5,10.58,1600,2,3 "ERCOT North 345KV Peak","applicationvnd.ms-excel",42010,42010,29.5,28.5,29.07,-10.43,12000,15,12 "ERCOT North 345KV Peak","application...

  16. CX-010107: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Curecanti-Morrow Point 230 Kilovolt (kV) and 12.47-kV Transmission Lines Access Road Maintenance CX(s) Applied: B1.3 Date: 04/12/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  17. OFFICE OF RIVER PROTECTION P.O. Box 450, MSIN H6-60

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (Reference 4). * De-scope 13.8kV and A8 Substation (Reference 5). * De-scope C-101 3 rd ... May 16, 2014) * De-scope 13.8kV and A8 Substation (WRPS-1204058 R3, dated June 6, 2013) * ...

  18. Letter from the Department of Energy to the District of Columbia Public Service Commission RE Docket No. EO-05-01

    Broader source: Energy.gov [DOE]

    Docket No. EO-05-01. PEPCO has informed DOE that the first new 230 kV line is expected to be completed by June 2, 2007. The outage for the second new 230 kV line is expected to begin immediately...

  19. Improved quality of intrafraction kilovoltage images by triggered readout of unexposed frames

    SciTech Connect (OSTI)

    Poulsen, Per Rugaard; Jonassen, Johnny; Jensen, Carsten; Schmidt, Mai Lykkegaard

    2015-11-15

    Purpose: The gantry-mounted kilovoltage (kV) imager of modern linear accelerators can be used for real-time tumor localization during radiation treatment delivery. However, the kV image quality often suffers from cross-scatter from the megavoltage (MV) treatment beam. This study investigates readout of unexposed kV frames as a means to improve the kV image quality in a series of experiments and a theoretical model of the observed image quality improvements. Methods: A series of fluoroscopic images were acquired of a solid water phantom with an embedded gold marker and an air cavity with and without simultaneous radiation of the phantom with a 6 MV beam delivered perpendicular to the kV beam with 300 and 600 monitor units per minute (MU/min). An in-house built device triggered readout of zero, one, or multiple unexposed frames between the kV exposures. The unexposed frames contained part of the MV scatter, consequently reducing the amount of MV scatter accumulated in the exposed frames. The image quality with and without unexposed frame readout was quantified as the contrast-to-noise ratio (CNR) of the gold marker and air cavity for a range of imaging frequencies from 1 to 15 Hz. To gain more insight into the observed CNR changes, the image lag of the kV imager was measured and used as input in a simple model that describes the CNR with unexposed frame readout in terms of the contrast, kV noise, and MV noise measured without readout of unexposed frames. Results: Without readout of unexposed kV frames, the quality of intratreatment kV images decreased dramatically with reduced kV frequencies due to MV scatter. The gold marker was only visible for imaging frequencies ≥3 Hz at 300 MU/min and ≥5 Hz for 600 MU/min. Visibility of the air cavity required even higher imaging frequencies. Readout of multiple unexposed frames ensured visibility of both structures at all imaging frequencies and a CNR that was independent of the kV frame rate. The image lag was 12.2%, 2

  20. Microsoft Word - fact sheet alternatives and key findings 090214.docx

    National Nuclear Security Administration (NNSA)

    Alternatives and Key Findings of the Draft SEIS ALTERNATIVES The Draft SEIS evaluates a range of reactor site and tritium production capacity alternatives. Seven alternatives are analyzed in the Draft SEIS:  Alternative 1 Watts Bar site only (2,500 TPBARs maximum). This is the preferred alternative.  Alternative 2 Sequoyah site only (2,500 TPBARs maximum).  Alternative 3 Both Watts Bar and Sequoyah sites (2,500 TPBARs maximum).  Alternative 4 Watts Bar site only (5,000 TPBARs

  1. CARBON DIOXIDE FLUXES IN A CENTRAL HARDWOODS OAK-HICKORY FOREST...

    Office of Scientific and Technical Information (OSTI)

    CO2 (500 ppm) near the surface in still air at night, venting of this buildup in the morning hours under radiation-induced turbulent air flow, and small vertical gradients of CO2 ...

  2. Residential Air-Source Heat Pump Program

    Broader source: Energy.gov [DOE]

    Massachusetts offers rebates of up to $2,500 for the installation of high-efficiency, cold-climate air-source heat pumps (ASHPs) in residential buildings of one to four units. 

  3. Made in Minnesota Solar Thermal Rebate

    Broader source: Energy.gov [DOE]

    Beginning in 2014, the Department of Commerce is offering a Made in Minnesota Solar Thermal Rebate program, pursuant to H.F. 729 enacted in 2013. Rebates are 25% of installed costs, with a $2,500...

  4. Rural Business Energy Efficiency Improvement Loan Program

    Broader source: Energy.gov [DOE]

    Unsecured loans from $2,500 to $30,000 are available at a fixed interest rate of 4% under this program. Loans will be fully amortized over a term of two to seven years, not to exceed the...

  5. CX-003787: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    John Day-Big Eddy Number 2 500-Kilovolt Transmission Line ReconductorCX(s) Applied: B4.6Date: 09/07/2010Location(s): Sherman County, OregonOffice(s): Bonneville Power Administration

  6. EECBG Success Story: Shining Energy-Saving LEDs on Utah Starry...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About 2,500 streetlights will be replaced and could save the town 20% to 50% on electricity bills. Learn more. Addthis Related Articles A worker installs energy-saving streetlights ...

  7. EIS-0226: Revision to the Record of Decision | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    of Decision for the Department of Energy's Waste Isolation Pilot Plant Disposal Phase (WIPP ROD), 63 FR 3624 (Jan. 23, 1998). DOE has decided to dispose of up to 2,500 cubic...

  8. Small Business Non-Profit Energy Audit Program

    Broader source: Energy.gov [DOE]

    This matching grant provides 75% for a level 2 energy audit up to a maximum of $2,500. A Level 2 Energy audit will include quantifications of energy users and losses through a detailed review and...

  9. Microsoft Word - TYSP Update Report_Y-12_2014

    National Nuclear Security Administration (NNSA)

    2,500 3,000 1,000 Recapitalization West End Treatment Facility Tank F-8 Refurbishment 1,200 0 0 Recapitalization Direct Electrolytic Reduction (DER) Deployment &...

  10. EERE Success Story-SunShot-funded Advanced Inverter Testing Enables...

    Office of Environmental Management (EM)

    SunShot-funded Advanced Inverter Testing Enables 2,500 Solar Energy Systems to Connect to Hawaii's Electric Grid EERE Success Story-SunShot-funded Advanced Inverter Testing Enables ...

  11. DuraLamp USA: Order (2010-CE-0912)

    Broader source: Energy.gov [DOE]

    DOE ordered DuraLamp USA, Inc. to pay a $2,500 civil penalty after finding DuraLamp USA had failed to certify that model PAR 30, an incandescent reflector lamp, complies with the applicable energy conservation standards.

  12. Chicopee Electric Light- Residential Solar Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Chicopee Electric Light offers rebates to residential customers who install solar photovoltaic (PV) systems on their homes. Customer rebates are $0.50 per watt for a maximum of $2,500 per...

  13. Microsoft PowerPoint - Johnson_EECBG

    Energy Savers [EERE]

    Million FY08 to 5 Billion for ARRA - Income eligibility raised from 150% to 200% of poverty level - Statewide Average Assistance per dwelling from 2,500 per unit to 6,500 WAP ...

  14. Presentation at the Weatherization Program Deep Dive Briefing...

    Energy Savers [EERE]

    Million FY08 to 5 Billion for ARRA - Income eligibility raised from 150% to 200% of poverty level - Statewide Average Assistance per dwelling from 2,500 per unit to 6,500 WAP ...

  15. Kun Renewables | Open Energy Information

    Open Energy Info (EERE)

    Kun Renewables Jump to: navigation, search Name: Kun Renewables Place: Kazakhstan Product: Plans to build a 2,500 tonne polysilicon plant in Kazakhstan, with the backing of the...

  16. Kids Clean Up ‘Polluted’ Groundwater at Festival

    Broader source: Energy.gov [DOE]

    GRAND JUNCTION, Colo. – Every spring, about 2,500 fifth graders in western Colorado participate in the Children’s Water Festival — two fun-filled days of discoveries about water.

  17. Tax Credits, Rebates & Savings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    audit up to a maximum of 2,500. A Level 2 Energy audit will include quantifications of energy users and losses through a detailed review and... Eligibility: Commercial, Local...

  18. Tribal Clean Energy Projects Awarded $6.5 Million from U.S. Energy...

    Energy Savers [EERE]

    ... installed, the projects will generate 5 megawatts of energy per hour using municipal solid waste and using cordwood for heating to save between 2,500 and 3,200 gallons of propane. ...

  19. UNIVERSITY PARK SCHOOLS SMALL TOWNS ON UPGRADES

    Broader source: Energy.gov [DOE]

    University Park, Maryland, a town of only 2,500 residents, sought to address the energy efficiency needs of its homeowners. To create a model for other resource-constrained small communities...

  20. PowerPoint Presentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    41 51 61 INCANDESCENT HALOGEN CFL LED 0 500 1,000 1,500 2,000 2,500 COUNCIL BASELINE MARKET AVERAGE TYPE: CURRENT PRACTICE BASELINE EFFICACY Linear Fluorescent Lamps, 4ft...

  1. Federal Employees' Group Life Insurance (FEGLI) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Option C coverage insures your spouse for up to 5 multiples of 5,000 andor eligible children for up to 5 multiples of 2,500. Cost of Insurance The cost of Basic Life Insurance ...

  2. Board Title

    Office of Environmental Management (EM)

    Northern New Mexico Citizens' Advisory Board 2017 Project Prioritization Meeting ... 1,500 2,000 2,500 3,000 3,500 4,000 Forecast Actual On-site Actual Off-site Volume ...

  3. RAPID/Roadmap/5-CO-a | Open Energy Information

    Open Energy Info (EERE)

    five hundred (2,500) feet or that expects to encounter geothermal fluids having a temperature greater than two hundred and twelve (212) degrees Fahrenheit. (Rule 4.2.28.1)....

  4. Central Moloney: Order (2013-SE-4702)

    Broader source: Energy.gov [DOE]

    DOE ordered Central Moloney, Inc. to pay a $2,500 civil penalty after finding Central Moloney had manufactured and distributed noncompliant liquid-immersed distribution transformers in commerce in the U.S.

  5. New Jersey Natural Gas- SAVEGREEN Residential On-Bill Financing Program

    Broader source: Energy.gov [DOE]

    Through the SAVEGREEN Project, New Jersey Natural Gas (NJNG) provides an On-Bill Repayment Program (OBRP) for $2,500 up to $10,000 at 0% APR with no fees, points, or closing cost for energy...

  6. Microsoft Word - Summary.doc

    National Nuclear Security Administration (NNSA)

    ... City, Nevada, to establish a "Green Energy Futures Park" demonstration program to be located within a limited portion of the 2,500-acre Eldorado Valley Energy Zone in Boulder City. ...

  7. Nevada Test Site DOE/EIS-0243-SA-01

    National Nuclear Security Administration (NNSA)

    ... Nevada in establishing a "Green Energy Futures Park" demonstration program to be located within a limited portion of the 2,500-acre Eldorado Valley Energy Zone in Boulder City. ...

  8. National Synchrotron Light Source

    ScienceCinema (OSTI)

    None

    2010-01-08

    A tour of Brookhaven's National Synchrotron Light Source (NSLS). The NSLS is one of the world's most widely used scientific research facilities, hosting more than 2,500 guest researchers each year. The NSLS provides intense beams of infrared, ultraviole

  9. Flag rates for deletion? | OpenEI Community

    Open Energy Info (EERE)

    some "rates" that don't belong; they are one-time connection fees instead of rates (e.g. with a 2,500 connection fee as a "fixed monthly charge"). Is there some way to flag...

  10. River Falls Municipal Utilities- Business Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Custom offerings include the Shared Savings Program, which provides incentives between $2,500 and $50,000 to cover the sometimes daunting upfront cost of energy efficiency improvements. Repayment...

  11. Residential Small Renewable Energy Rebate Program

    Broader source: Energy.gov [DOE]

    The rebate is equal to $0.50 per watt of nominal generation capacity per residential owner of an eligible facility, up to $2,500 or 30% of system costs, whichever is less. 

  12. County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    electrical equipment replacementat Gila Substation in Yuma County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace a 34.5-kV circuit breaker within the fenced area of Gila Substation. This will consist of removing the existing 34.5-kV circuit breaker and foundation, trenching to add control cables and conduit to the control building, laying a new foundation and adding a new 34.5-kV circuit breaker. Western will be using existing access roads

  13. Revenue metering error caused by induced voltage from adjacent transmission lines

    SciTech Connect (OSTI)

    Hughes, M.B. )

    1992-04-01

    A large zero sequence voltage was found to have been induced onto a 138 kV line from adjacent 500 kV lines where these share the same transmission right-of-way. This zero sequence voltage distorted the 2-1/2-element revenue metering schemes used for two large industrial customer supplied directly from the affected 138 kV line. As a result, these two customers were overcharged, on average, approximately 3.5% for 15 years. This paper describes the work done to trace the origins of the zero sequence voltage, quantify the metering error, and calculate customer refunds which, in the end, totalled $4 million.

  14. Re: Potomac River Generating Station Department of Energy, Case No.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits | Department of Energy evised plan for transmission outages for the 230 kV circuits Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Docket No. EO-05-01. Order No. 202-07-02: Potomac Electric Power Company ("Pepco") is providing you with the

  15. An Image-Guided Study of Setup Reproducibility of Postmastectomy Breast Cancer Patients Treated With Inverse-Planned Intensity Modulated Radiation Therapy

    SciTech Connect (OSTI)

    Feng, Christine H.; Gerry, Emily; Chmura, Steven J.; Hasan, Yasmin; Al-Hallaq, Hania A.

    2015-01-01

    Purpose: To calculate planning target volume (PTV) margins for chest wall and regional nodal targets using daily orthogonal kilovolt (kV) imaging and to study residual setup error after kV alignment using volumetric cone-beam computed tomography (CBCT). Methods and Materials: Twenty-one postmastectomy patients were treated with intensity modulated radiation therapy with 7-mm PTV margins. Population-based PTV margins were calculated from translational shifts after daily kV positioning and/or weekly CBCT data for each of 8 patients, whose surgical clips were used as surrogates for target volumes. Errors from kV and CBCT data were mathematically combined to generate PTV margins for 3 simulated alignment workflows: (1) skin marks alone; (2) weekly kV imaging; and (3) daily kV imaging. Results: The kV data from 613 treatment fractions indicated that a 7-mm uniform margin would account for 95% of daily shifts if patients were positioned using only skin marks. Total setup errors incorporating both kV and CBCT data were larger than those from kV alone, yielding PTV expansions of 7 mm anterior–posterior, 9 mm left–right, and 9 mm superior–inferior. Required PTV margins after weekly kV imaging were similar in magnitude as alignment to skin marks, but rotational adjustments of patients were required in 32% ± 17% of treatments. These rotations would have remained uncorrected without the use of daily kV imaging. Despite the use of daily kV imaging, CBCT data taken at the treatment position indicate that an anisotropic PTV margin of 6 mm anterior–posterior, 4 mm left–right, and 8 mm superior–inferior must be retained to account for residual errors. Conclusions: Cone-beam CT provides additional information on 3-dimensional reproducibility of treatment setup for chest wall targets. Three-dimensional data indicate that a uniform 7-mm PTV margin is insufficient in the absence of daily IGRT. Interfraction movement is greater than suggested by 2-dimensional

  16. Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a double circuit upgrade and structure replacement along the existing Casa Grande-Empire 11~-kV transmission line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace structures and upgrade to a double circuit 230-kV transmission line on its Casa Grande-Empire115-kV transmission line, from Thornton Road to its Empire Substation, within Western's existing right-of-way. This will include the rebuild of 13.2 miles of transmission line,

  17. Coupled Thermal-Hydrological-Mechanical Processes in Salt, Hot Granular

    Office of Environmental Management (EM)

    electrical equipment replacementat Gila Substation in Yuma County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace a 34.5-kV circuit breaker within the fenced area of Gila Substation. This will consist of removing the existing 34.5-kV circuit breaker and foundation, trenching to add control cables and conduit to the control building, laying a new foundation and adding a new 34.5-kV circuit breaker. Western will be using existing access roads

  18. Results from ORNL Characterization of Zr02-500-AK2 - Surrogate TRISO Material

    SciTech Connect (OSTI)

    Hunn, John D; Kercher, Andrew K

    2005-06-01

    This document is a compilation of the characterization data for the TRISO-coated surrogate particle batch designated ZrO2-500-AK2 that was produced at Oak Ridge National Laboratory (ORNL) as part of the Advanced Gas Reactor Fuel Development and Qualification (AGR) program. The ZrO2-500-AK2 material contains nominally 500 {micro}m kernels of yttria-stabilized zirconia (YSZ) coated with all TRISO layers (buffer, inner pyrocarbon, silicon carbide, and outer pyrocarbon). The ZrO2-500-AK2 material was created for: (1) irradiation testing in the High Flux Isotope Reactor (HFIR) and (2) limited dissemination to laboratories as deemed appropriate to the AGR program. This material was created midway into a TRISO fuel development program to accommodate a sudden opportunity to perform irradiation testing on surrogate material. While the layer deposition processes were chosen based on the best technical understanding at the time, technical progress at ORNL has led to an evolution in the perceived optimal deposition conditions since the createion of ZrO2-500-AK2. Thus, ZrO2-500-AK2 contains a reasonable TRISO microstructure, but does differ significanly from currently produced TRISO surrogates and fuel at ORNL. In this document, characterization data of the ZrO2-500-AK2 surrogate includes: size, shape, coating thickness, and density.

  19. RadiaBeam PPT template

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    area Magnetic measurements lab Optics lab Hot test cell (up to 9 MeV) ... 1. Thermionic gun (60 kV) 2. Magnetic optics 3. Hoppers 4. Mechanical rake 5. Built ...

  20. EA-1595: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Davis-Mead 230-kV Transmission Line from Western's Davis substation near Bullhead City, Mohave County, Arizona to its Mead substation near Boulder City, Clark County, Nevada. ...

  1. CX-010428: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Alvey Substation 115-kilovolt and 230-kV Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/14/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  2. EA-1891: Mitigation Action Plan | Department of Energy

    Office of Environmental Management (EM)

    The project would rebuild the aging 97.5-mile-long 230- kilovolt (kV) Alvey-Fairview transmission line in Lane, Douglas, and Coos counties, Oregon. This MAP is for the Proposed ...

  3. EA-1912: Draft Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    of the 115-kV wood-pole Benton-Othello No. 1 transmission line. The lines are aging and require replacing wood-pole structures and other components of the transmission line. ...

  4. Judith Kimling1, Theo Gerhardt1, ...

    Office of Scientific and Technical Information (OSTI)

    ... < > C for 30 min, and exposed with a scanning electron microscope at 10kV. After development, ... imaged by transmission soft x-ray microscopy at the XM-1 full field microscope at ...

  5. EIS-0285-SA-148: Supplement Analysis | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    project with US Forest Service for vegetation control for the McNary- Santiam 2 230 kV transmission line that enhances wildlife habitat under powerlines Supplement Analysis for...

  6. Property:HeadquartersCity | Open Energy Information

    Open Energy Info (EERE)

    25 pages using this property. (previous 25) (next 25) 2 220 kV SSSC device for power flow control (Smart Grid Project) + Catalonia + 4 44 Tech Inc. Smart Grid Demonstration Project...

  7. EIS-0422: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40–Mile-Long 500-kilovolt (kV) Transmission Line

  8. EIS-0129: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0129: Draft Environmental Impact Statement New EnglandHydro-Quebec 450 kV Transmission Line Interconnection - Phase II PDF icon EIS-0129-DEIS.pdf More Documents & Publications ...

  9. EIS-0285-SA-95: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chehalis-Centralia No. 2, 230kV transmission line. The project area is located within Lewis and Thurston Counties, Washington PDF icon Supplement Analysis for the Transmission...

  10. Microsoft Word - Mirant February 07 order draft DRH mark 4.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... to operate to achieve full power in Line Outage situations, and the need for the Order after the new 230 kV lines are operational. * Further consideration of mitigation measures. ...

  11. Property:NEPA Completion Notes | Open Energy Information

    Open Energy Info (EERE)

    eset-345kv-transmission-line-project-north B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 82: Data reviewed for completion Barren Ridge Renewable Transmission + LADWP Project Website:...

  12. Property:CompletionNotes | Open Energy Information

    Open Energy Info (EERE)

    eset-345kv-transmission-line-project-north B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 82: Data reviewed for completion Barren Ridge Renewable Transmission + LADWP Project Website:...

  13. ANUEADflM-31 Electric Power High-Voltage Transmission Lines:

    Office of Scientific and Technical Information (OSTI)

    ... design options to reduce human exposure to EMFs from high-voltage transmission lines. ... assumed for the 345-kV designs: 150-R rights-of-way for overhead lines, 50-ft ...

  14. EIS-0365: Record of Decision and Floodplain Statement of Findings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Record of Decision and Floodplain Statement of Findings EIS-0365: Record of Decision and Floodplain Statement of Findings Imperial-Mexicali 230-kV Transmission Lines DOE announces...

  15. Slide 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1-XXXXP Leveraging In-Memory KeyValue Stores in HPC Kelpie Craig Ulmer Overview: Leveraging KV Stores NoSQL: Dramatic impact on Out-of-Core processing Frameworks handle...

  16. DNA origami: A quantum leap for self assembly of complex structures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DNA origami: A quantum leap for self assembly of complex structures Authors: Trring, T., Voigt, N.V., Nangreave, J., Yan, H., and Gothelf, K.V. Title: DNA origami: A quantum leap...

  17. CX-009705: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Lane Substation 500/230-kV Transformer Phase Separation Project CX(s) Applied: B4.6 Date: 12/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  18. BPA-2011-00507-FOIA Correspondence

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    management on my land. Please note location: Satsop Aberdeen 2 230kV Transmission Line right-of-way corridor, parcel 180933 130000, Steve W. Narolski, Program Manager 3. We have...

  19. 09-032 FOIA Correspondence.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    your request. You have requested copies of the following: 1. Total investment in the Garrison to Taft 500 kv transmission line facilities in Montana for the year ending 1231...

  20. Pacific DC Intertie Upgrade Project Status Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    T I O N Pre-Decisional. For Discussion Purposes Only. PDCI Upgrade Project Replace aging Celilo 4 converter terminal with a new 2 converter terminal rated 560kV and 3410A...

  1. EIS-0231: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV)...

  2. EA-1383: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Amendment of Presidential Permit (PP-68) for San Diego Gas and Electric Company for Interconnection of Otay Mesa Generating Project to Miguel-Tijuana 230-kV Transmission Line, San Diego, California

  3. EIS-0296: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    proposes to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division...

  4. EA-1739: Finding of No Significant Impact | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    (Figure 1-1). This 46-mile, 115-kilovolt1 (kV) transmission line, located between the BPA Bandon Substation and the BPA Rogue Substation in Coos and Curry counties, is old,...

  5. Y-12's 1958 nuclear criticality accident and increased safety...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    accident and increased safety - 1958 brought accidents, more safety The first X-ray machine was brought to Y-12 in February, 1949. It was a 1,000 KV system installed in Building...

  6. News Item

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    200 kV Spherical Aberration Cs: 1.2mm Chromatic Aberration Cc: 1.2mm Detectors Oxford INCA energy dispersive X-ray detector with energy resolution of 136eV for Mn k-alpha...

  7. Development of high-voltage pulse-slicer unit with variable pulse duration for pulse radiolysis system

    SciTech Connect (OSTI)

    Upadhyay, J.; Sharma, M. L.; Navathe, C. P.; Toley, M. A.; Shinde, S. J.; Nadkarni, S. A.; Sarkar, S. K.

    2012-02-15

    A high-voltage pulse-slicer unit with variable pulse duration has been developed and integrated with a 7 MeV linear electron accelerator (LINAC) for pulse radiolysis investigation. The pulse-slicer unit provides switching voltage from 1 kV to 10 kV with rise time better than 5 ns. Two MOSFET based 10 kV switches were configured in differential mode to get variable duration pulses. The high-voltage pulse has been applied to the deflecting plates of the LINAC for slicing of electron beam of 2 {mu}s duration. The duration of the electron beam has been varied from 30 ns to 2 {mu}s with the optimized pulse amplitude of 7 kV to get corresponding radiation doses from 6 Gy to 167 Gy.

  8. EIS-0451: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    transmission line and a 138115-kV substation (collectively referred to as the Hooper Springs Project). The new BPA substation would be called Hooper Springs Substation and would...

  9. EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

  10. Property:NEPA Resource Analysis | Open Energy Information

    Open Energy Info (EERE)

    NV-063-EA06-098 NV-EA-030-07-05 North Steens 230kV Transmission O One Nevada S Sigurd Red Butte No2 Sun Valley to Morgan Transmission Line Sunzia Southwest T Tehachapi Renewable...

  11. Sigurd Red Butte No2 | Open Energy Information

    Open Energy Info (EERE)

    Sigurd Red Butte No2 Jump to: navigation, search NEPA Document Collection for: Sigurd Red Butte No2 EIS for NA Sigurd to Red Butte No. 2 345kV Transmission Project General NEPA...

  12. RAPID/BulkTransmission/Utah | Open Energy Information

    Open Energy Info (EERE)

    Administration Current Projects Transwest Express Zephyr Populus to Ben Lomand Sigurd to Red Butte No. 2 345kV Transmission Project Print PDF RAPID-State-Summary Retrieved from...

  13. EIS-0443: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    235 miles of 500- kilovolt (kV) transmission line. SWIP-South would extend from Harry Allen substation near Las Vegas, Nevada northward to the proposed Thirtymile Substation near...

  14. DOE/EIS-0485 Final Environmental Impact Statement Grande Prairie...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grande Prairie Wind has applied to Western to interconnect the proposed Project to Western's 345-kilovolt (kV) Fort Thompson to Grand Island transmission line at a new switchyard. ...

  15. EIS-0507: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    re initiated scoping for an EIS to evaluate the potential environmental impacts of a proposal to construct a new 500-kV transmission line from northeast Oregon to southwest Idaho. ...

  16. BUREAU OF LAND MANAGEMENT Farmington District Office 6251 College...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Tri-State), the applicant, to construct, operate and maintain a new 230 kV overhead electric transmission line. The BLM Farmington Field Office is the lead for this Project. ...

  17. EIS-0507: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    their intent to prepare an EIS to evaluate the potential environmental impacts of a proposal to construct a new 500-kV transmission line from northeast Oregon to southwest Idaho. ...

  18. EA-2002: Finding of No Significant Impact | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-2002: Finding of No Significant Impact Right-of-Way Application for the Tucson-Apache 115-kV Transmission Line, Pima County, Arizona Western Area Power Administration issued a ...

  19. EIS-0414: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    construct, operate, maintain, and connect a double-circuit, 230,000-volt (230-kV) electric transmission line across the U.S.-Mexico border in eastern San Diego County, California. ...

  20. EA-1912: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Midway-Benton No. 1 transmission line and approximately 11 miles of the 115-kV Benton-Othello No. 1 transmission line between the existing Midway and Benton Substations, located...

  1. State Grid Corp | Open Energy Information

    Open Energy Info (EERE)

    State Grid Corp Jump to: navigation, search 2011-2015 Plans for 1000kV transmission lines (UHV) 1 http:www.chinadaily.com.cnbusiness2010-0813content11148692.htm...

  2. Type B Accident Investigation Report of the Arc Flash at Brookhaven...

    Energy Savers [EERE]

    ... CAS electronic technician 1 began cleaning up the tools used. CAS electronic technician 2 began positioning the screw-drive motor for re-racking the13.8-kV circuit breaker for the ...

  3. Sandia National Laboratories: Other Facilities and Capabilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Other Facilities and Capabilities High Voltage Breakdown Testing We can perform high voltage standoff testing with DC and pulsed voltages. DC testing can be conducted up to 200 kV....

  4. SAS Output

    U.S. Energy Information Administration (EIA) Indexed Site

    B. U.S. Transformer Sustained Automatic Outage Counts and Hours by High-Voltage Size and NERC Region, 2013 Sustained Automatic Outage Counts High-Side Voltage (kV) Eastern...

  5. EIS-0421: Big Eddy-Knight Transmission Line

    Broader source: Energy.gov [DOE]

    BPA is proposing to build a new 500 kilovolt (kV) transmission line in Wasco County, Oregon and Klickitat County, Washington and a new substation in Klickitat County. The new BPA transmission line...

  6. Wind Development on the Rosebud

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RFP was issued in Fall of 2007 Rosebud Sioux Tribe and Citizens Wind entered into an MOA ... WAPA 115 kv, and Cherry Todd Substation RST Met tower installed Fall of 2003 Citizens Wind ...

  7. Microsoft Word - titlepage.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MS-1152 Albuquerque, New Mexico 87185 USA Abstract 1 Measurements on a 30 kV electron gun with ten independent cathodes, operating in a 6.5 Tesla (T) magnetic field are presented. ...

  8. Microsoft PowerPoint - Haught Innovative Materials Grid Components...

    Office of Environmental Management (EM)

    ... World's first HTS cable energized 1990 10 meter length of 1G wire produced 1993 2.5 tesla HTS coil demonstrated 1991 First 2G tape demonstrated 1996 2.4 kV HTS current ...

  9. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... Improved DC Gun and Insulator Assembly Neubauer, Michael ; Johnson, Rolland P Many user ... A novel gun design with gradients around 5 MVm and operating at 350 kV, a major ...

  10. EA-1665: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Assessment and Finding of No Significant Impact EA-1665: Final Environmental Assessment and Finding of No Significant Impact Davis-Kingman Tap 69-kV...

  11. Integrating wind turbines into the Orcas Island distribution system

    SciTech Connect (OSTI)

    Zaininger, H.W.

    1998-09-01

    This research effort consists of two years of wind data collection and analysis to investigate the possibility of strategically locating a megawatt (MW) scale wind farm near the end of an Orcas Power and light Company (OPALCO) 25-kilovolt (kV) distribution circuit to defer the need to upgrade the line to 69 kV. The results of this study support the results of previous work in which another year of wind data and collection was performed. Both this study and the previous study show that adding a MW-scale wind farm at the Mt. Constitution site is a feasible alternative to upgrading the OPALCO 25-kV distribution circuit to 69 kV.

  12. EA-1685: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Planet Tap 69-kV Transmission Line Rebuild, Upgrade and Right-Of-Way Action The potential impacts to the environment are discussed in detail within this document. This EA provides...

  13. Price hub","Trade date","Delivery start date","Delivery

    U.S. Energy Information Administration (EIA) Indexed Site

    009,42009,40,39,39.5,10.58,1600,2,3 "ERCOT North 345KV Peak","application/vnd.ms-excel",42010,42010,29.5,28.5,29.07,-10.43,12000,15,12 "ERCOT North 345KV Peak","application/vnd.ms-excel",42012,42012,43,41.5,42.25,13.18,6400,8,9 "ERCOT North 345KV Peak","application/vnd.ms-excel",42013,42013,31,29.5,29.86,-12.39,17600,20,11 "ERCOT North 345KV Peak","application/vnd.ms-excel",42016,42016,28.75,27.25,27.7,-2.16,4000,5,7

  14. EIS-0231: Navajo Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned...

  15. Re: Potomac River Generating Station Department of Energy, Case...

    Broader source: Energy.gov (indexed) [DOE]

    Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages.

  16. Joint Maintenance Status Report of Potomac Electric Power Company...

    Office of Environmental Management (EM)

    LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, ... and findings made during the maintenance outages for Pepco's two 230 kV circuits from the ...

  17. Re: Potomac River Generating Station Department of Energy, Case...

    Office of Environmental Management (EM)

    Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits ...

  18. Operating Plan of Mirant Potomac River, LLC in Compliance with...

    Broader source: Energy.gov (indexed) [DOE]

    Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

  19. Microsoft Word - DOE-ID-INL-16-069 (1).docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Thus, if faults occur causing power outages in the test power circuits, separate power on the 13.8kV OHL to the user locations for instrumentation or control related power needs ...

  20. Potomac River Project Outage Schedule Clarification | Department...

    Office of Environmental Management (EM)

    Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits ...

  1. Department of Energy Order No. 202-07-1 | Department of Energy

    Office of Environmental Management (EM)

    Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Notice of Unplanned Outage at the Mirant ...

  2. Microsoft Word - DOE-ID-INL-15-046.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Thus, if faults occur causing power outages in the test power circuits, separate power on the 13.8kV OHL to the user locations for instrumentation or control related power needs ...

  3. CX-008775: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Archer KV1A Replacement Laramie County, Wyoming CX(s) Applied: B4.6 Date: 05/24/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  4. J319.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MISO Project Number J319 Point of Interconnection Entergy AR ANO-Pleasant Hill 500 kV line ... Page 1 of 3 February 10, 2014 MISO Project Number J319 Point of Interconnection Holland ...

  5. FERC Pleading Template

    Broader source: Energy.gov (indexed) [DOE]

    ... CapX energized the first segment (Monticello to St. Cloud) of the Fargo-St. Cloud 345 kV ... whether they be pooled systems as in Georgia, Indiana, and Minnesota or an LSE transco ...

  6. Major Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    93016 500 kV Spare Transformer Project Acquire 5 spares and relocate 2 existing transformers to be used as spares. The spares will be placed strategically across the system....

  7. BPA-2012-00860-FOIA Correspondence

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    following: Contract issued to HICO America on September 15, 2009, for Lot 1, 525kV transformers, to include unit pricing for each transformer rating available for purchase under...

  8. BPA-2012-00862-FOIA Correspondence

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract issued to Hyundai Heavy Industries on November 13, 2009, for Lot 2, 230kV transformers, to include unit pricing for each transformer rating available for purchase under...

  9. BPA-2013-01283-FOIA Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    contracts contain these products and decide how to proceed from there. 1. Power Transformers 69kV and above (step up & step down) Key Attributes: High side Rated kV-Low Rated...

  10. Major Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    thru FY14 500 kV Spare Transformer Project Acquire 5 spares and relocate 2 existing transformers to be used as spares. The spares will be placed strategically across the system....

  11. BPA-2012-00860-FOIA Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Request: Contract issued to HICO America on September 15, 2009, for Lot 1, 525kV transformers, resulting from BPA Solicitation SSTR09, Large Power Transformers. Hsaio-Lan McGee...

  12. Major Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    122818 500 kV Spare Transformer Project Acquire 5 spares and relocate 2 existing transformers to be used as spares. The spares will be placed strategically across the system....

  13. BPA-2012-00862-FOIA Response

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract issued to Hyundai Heavy Industries on November 13, 2009, for Lot 2, 230kV transformers, to include unit pricing for each transformer rating available for purchase under...

  14. Microsoft Word - BPA-2013-01283-FResponse.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A data pull from a purchasing database for the following information: 1. Power Transformers 69kV and above (step up & step down) Key Attributes: High side Rated kV-Low Rated...

  15. Major Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    121917 500 kV Spare Transformer Project Acquire 5 spares and relocate 2 existing transformers to be used as spares. The spares will be placed strategically across the system....

  16. BPA-2012-00862-FOIA Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract issued to Hyundai Heavy Industries on November 13, 2009, for Lot 2, 230kV transformers, resulting from BPA Solicitation SSTR09, Large Power Transformers. This information...

  17. BPA-2011-00505-FOIA Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 i f ( s c7' e F Dear Ms. Brennon: As in the past, we wish to obtain the cost or investment in the 500 kv transmission line systems in Montana. Pursuant to the Freedom of...

  18. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Substation - Additional 500kV Transformer This project will install a new transformer comprised of three single phase 476 MVA transformers at McNary Substation. The project also...

  19. BPA-2011-00505-FOIA Correspondence

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agency about your request. You have requested the following: A copy of the cost or investment in the 500 kv transmission line systems in Montana: 1. Total investment in the...

  20. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SVC renovations and the Big Eddy-Knight 500 kV line project). The objectives of this investment are to: * Reduce the frequency of line switching during light load hours to minimize...

  1. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sustain Steel Program Defective Damper Replacements The bulk of the 500 kV main grid (4,870 miles) is composed of conductor bundles in each phase or pole position. Spacer dampers...

  2. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hungry Horse Station Service Replacement This project will replace the station service 2300V power distribution board and 13.8kV cables installed as original equipment (circa 1950)...

  3. EIS-0129: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0129: Final Environmental Impact Statement New EnglandHydro-Quebec 450 kV Transmission Line Interconnection - Phase II PDF icon EIS-0129-FEIS.pdf PDF icon ...

  4. Comments from the City of Alexandria in Support of the Comments...

    Broader source: Energy.gov (indexed) [DOE]

    transmission outages of the 230kV transmission lines that serve the Potomac River Substation on January 9, 2006. Comments from the City of Alexandria in Support of the Comments ...

  5. Level 1 Accident Investigation Report of August 17, 2004, Fatal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    wire on the Grand Coulee-Bell 6 500-kV line between tower 842 and BPA's Bell Substation in Mead, Washington. (See Appendix 7, Site Map.) Level 1 Accident Investigation ...

  6. Department of Energy Offers Conditional Commitment for a Loan...

    Office of Environmental Management (EM)

    ON Line consists of a new 500 kilovolt (kV) AC transmission line that will run 235 miles from Ely, Nevada to just north of Las Vegas, with a new substation located at the northern ...

  7. EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmissio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Both 115-kV lines originate at the BPA Midway Substation in Benton County and terminate in Yakima County. Additional information is available at https:www.bpa.govefwAnalysis...

  8. EA-1880: Big Bend to Witten Transmission Line Project, South...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to construct, own, and operate an approximately 70-mile long 230-kV single-circuit transmission line that would connect a new switchyard with the existing Witten Substation. ...

  9. A I K E N

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Together not only did we build the Duke Energy eGRID and the wind turbine FOR IMMEDIATE RELEASE Duke Energy 230KV High Voltage Substation. Photograph Courtesy of Duke Energy Media ...

  10. Bonneville Power Administration

    Broader source: Energy.gov (indexed) [DOE]

    138115-kilovolt (kV) Hooper Springs Substation that will be located near the city of ... north then east from the Hooper Springs Substation to a new BPA connection facility that ...

  11. EA-1383: Final Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Amendment of Presidential Permit (PP-68) San Diego Gas & Electric Company for Interconnection of Otay Mesa Generating Project to Miguel-Tijuana 230 kV Transmission Line San Diego, California

  12. EIS-0365: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    230,000-volt (230-kV) electric transmission lines across the U.S. border with Mexico. In addition, right-of-way grants were issued to each company by the Department of...

  13. EIS-0332: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    kV transmission line between Bonneville Power Administration's existing McNary and John Day substations. PDF icon DOEEIS-0332: Mitigation Action Plan for the McNary-John Day...

  14. Supplement Analyses (SA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site, Richland, Washington August 15, 2011 EIS-0399-SA-01: Supplement Analysis Montana-Alberta Tie Ltd. 230-kV Transmission Line Project August 4, 2011 EIS-0348-SA-03: Supplement...

  15. EIS-0399: Record of Decision (OE) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OE) EIS-0399: Record of Decision (OE) Montana Alberta Tie Ltd. 230-kV Transmission Line Project Department of Energy announces its decision to issue a Presidential permit to...

  16. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2005 EA-1551: Notice of Intent to Prepare an Environmental Assessment EA-1551: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line March 4, 2005 EIS-0342: DOE Notice of...

  17. Record of Decision (ROD) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revised by State September 25, 2009 EIS-0399: Record of Decision (WAPA) Montana Alberta Tie Ltd. 230-kV Transmission Line Project September 15, 2009 EIS-0312: Record of...

  18. EIS-0399-SA-01: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -SA-01: Supplement Analysis EIS-0399-SA-01: Supplement Analysis Montana-Alberta Tie Ltd. 230-kV Transmission Line Project Proposed Action: Modification to relocate four segments of...

  19. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line January 11, 2008 EIS-0236-S4: DOE Notice of...

  20. EIS-0399: Record of Decision (WAPA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WAPA) EIS-0399: Record of Decision (WAPA) Montana Alberta Tie Ltd. 230-kV Transmission Line Project The Western Area Power Administration has decided to finance a portion of the...

  1. EIS-0422: EPA Notice of Availability of the Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40–Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington

  2. Microsoft Word - DOE-ID-INL-13-006 R1-(INL-13-019 R1-redline...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Two circuits of three-phase distribution lines will be ... to approximately pole 40E on the 138kV transmission line. ... non-road engines (small electrical generators), but are ...

  3. CX-003611: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer ReplacementCX(s) Applied: B1.3Date: 08/25/2010Location(s): King County, WashingtonOffice(s): Bonneville Power Administration

  4. CX-010686: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Cheyenne Substation KV2A 115-kilovolt Tie Line Installation CX(s) Applied: B4.6 Date: 07/02/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  5. Microsoft Word - HV-BPL Final Report to NETL.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... channels that control their electrical grid. ... Line (BPL) connection operating on the in-service, 0.77 mile, 69 kV transmission line ... on MV distribution lines, making ...

  6. EA-1853: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Perrin Ranch Wind submitted an interconnection request to Western in 2010 to interconnect the proposed project to the existing Moenkopi-Yavapai 500-kV transmission line. Western is...

  7. Energy Storage Systems 2012 Peer Review Presentations - Day 2...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review - 15 kV Phase Leg Power Modules with SiC Devices - Ranbir Singh, GeneSiC Semiconductor (1.52 MB) ESS 2012 Peer Review - Experimental Investigation of Silicon Carbide ...

  8. EA-1909: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    40 turbines, to Western's existing Archer-Sidney 115-kV Transmission Line in Kimball County, Nebraska. PDF icon EA-1909-FEA-2012.pdf More Documents & Publications EA-1909: Draft...

  9. APPLICATION OF A CATEGORICAL EXCLUSION

    Office of Environmental Management (EM)

    Electric Power (AEP) for the installation and maintenance of an overhead 7.2kv electrical power line from an existing AEP power pole located on U S Department of Energy...

  10. Annual Report to Congress on Federal Government Energy Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Structure CO F 161 kV Sw itch House COF Dry Fly Ash Eqpt Bldg BRF Pumping Station ... Bldg BFN Unit 1 & 2 Dsl.Gen. Bldg PAF Scrubber Control Bldg BFN Unit 3 Diesel Generator ...

  11. EA-1941: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BPA issued a Final EA to assess the potential environmental impacts of proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission ...

  12. EA-1941: Finding of No Significant Impact (FONSI) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BPA issued a Finding of No Significant Impact for proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission Line. PDF icon ...

  13. Sandia National Laboratories: Other Facilities and Capabilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Other Facilities and Capabilities High Voltage Breakdown Testing We can perform high voltage standoff testing with DC and pulsed voltages. DC testing can be conducted up to 200 kV. Pulsed voltage from 140 - 400 kV can be attained, with a typical lightning waveform - unipolar, 1.2 microsecond risetime and 50 microsecond pulse width. Testing is conducted in humidity-controlled chambers. Breakdown voltage and current can be measured. Small TEM Cell We have a small transverse electromagnetic (TEM)

  14. EA-1843: Imperial Solar Energy Center West, California

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Environmental Impact Report / Environmental Assessment (EIR/EA), prepared by Bureau of Land Management, evaluates the potential environmental impacts from the CSOLAR Development, LLC, right-of-way (ROW) application to construct, operate, and maintain a 230-kV transmission line. The electric generating facility would connect to the Imperial Valley Substation via a 230-kV transmission line. DOE is a cooperating agency and plans to adopt the EA.

  15. U.S. Energy Information Administration (EIA) - Map

    Gasoline and Diesel Fuel Update (EIA)

    Isaac Overview Data Petroleum and Other Liquids Natural Gas Refinery Capacity Natural Gas Processing Plants Map Uncheck or check an item to hide or show it in the map. Electric Power Plants (>=100 MW) Coal Hydroelectric Natural Gas Nuclear Petroleum Wood Wind Other Electricity Transmission Lines (>=345kV) Electricity Transmission Lines (<345kV) LNG terminals Natural Gas Market Centers (Hubs) Natural Gas Processing Plants Natural Gas Interstate, Intrastate, and Gathering Pipelines Oil

  16. U.S. Energy Information Administration (EIA) - Map

    Gasoline and Diesel Fuel Update (EIA)

    Uncheck or check an item to hide or show it in the map. Electric Power Plants (>=100 MW) Coal Hydroelectric Natural Gas Nuclear Petroleum Wood Wind Other Electricity Transmission Lines (>=345kV) Electricity Transmission Lines (<345kV) LNG terminals Natural Gas Market Centers (Hubs) Natural Gas Processing Plants Natural Gas Interstate, Intrastate, and Gathering Pipelines Oil Import Site & Oil Seaports Petroleum Refineries Heating Oil Reserve Site Show All Hide All Map Sources:

  17. Tribal TG Telecon 7_11_07

    Office of Environmental Management (EM)

    Y TRIBAL OWNERSHIP & CAPTURING THE GOVERNMENT TAX BASE - 3 PROJECTS CAMPO BAND OF KUMEYAAY Southeast San Diego County 24 square miles Population: 365 GENERAL PARAMETERS * 66kV line on Reservation with substation * 500 kV line with substation 15 miles from Reservation * Interstate highway through Reservation * Railway line through Reservation * 3 MM in-County customer base * Average 30% capacity factor on ridge tops THREE APPROACHES * Kumeyaay Wind * 50 MW passive lease * 25 year lease *

  18. Tribal Ownership & Capturing the Government Tax Base - 3 Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Y TRIBAL OWNERSHIP & CAPTURING THE GOVERNMENT TAX BASE - 3 PROJECTS CAMPO BAND OF KUMEYAAY Southeast San Diego County 24 square miles Population: 365 GENERAL PARAMETERS * 66kV line on Reservation with substation * 500 kV line with substation 15 miles from Reservation * Interstate highway through Reservation * Railway line through Reservation * 3 MM in-County customer base * Average 30% capacity factor on ridge tops THREE APPROACHES * Kumeyaay Wind * 50 MW passive lease * 25 year lease *

  19. CX-007147: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Categorical Exclusion Determination CX-007147: Categorical Exclusion Determination Flagstaff Substation Breaker Replacement & Control Cable Addition CX(s) Applied: B2.5 Date: 02/18/2011 Location(s): Coconino County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes on removing four existing 345-kilovolt (kV) circuit breakers and installing four new 362-kV circuit breakers as well as adding new power and control cables in existing cable trenches

  20. EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration prepared this EA and a finding of no significant impact for a proposal to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kV transmission lines, located in Big Horn County, Wyoming, and Big Horn and Carbon Counties in Montana, and the Basin-Lovell 115-kV transmission line in Big Horn County, Wyoming.

  1. Dependence of the Electron Beam Energy and Types of Surface to Determine EBSD Indexing Reliability in Yttria-Stabilized Zirconia

    SciTech Connect (OSTI)

    Saraf, Laxmikant V.

    2012-04-01

    Electron backscatter diffraction (EBSD) is a powerful technique for the surface microstructure analysis. EBSD analysis of cubic yttria-stabilized zirconia (YSZ) in two and three dimensions (2-D, 3-D) is demonstrated using sequential slicing from a focused ion beam (FIB) followed by EBSD mapping to represent 3-D reconstructed high density grain structure with random orientation. The statistics related to accuracy of EBSD band detection shows that probability of accurate grain orientation detection increased significantly when the electron beam energy is increased from 10 kV to 30 kV. As a result of better sampling with increased interaction volume, a disparity between local and average grain orientation angle also exhibited the dependence of the electron beam energy to determine the accuracy of grain orientation. To study the accuracy and quality of EBSD band detection as a function of surface roughness and over layer formation, rapid EBSD measurement tests are performed on (a) YSZ surfaces ion-polished at ion beam energies of 65 nA at 30 kV and 1 nA at 30 kV and (b) carbon coated versus uncoated YSZ surfaces. The EBSD results at both 10 kV and 30 kV electron beam energies indicate that EBSD band detection accuracy is negatively affected by surface roughness and amorphous over layer formation.

  2. In-patient to isocenter KERMA ratios in CT

    SciTech Connect (OSTI)

    Huda, Walter; Ogden, Kent M.; Lavallee, Robert L.; Roskopf, Marsha L.; Scalzetti, Ernest M.

    2011-10-15

    Purpose: To estimate in-patient KERMA for specific organs in computed tomography (CT) scanning using ratios to isocenter free-in-air KERMA obtained using a Rando phantom.Method: A CT scan of an anthropomorphic phantom results in an air KERMA K at a selected phantom location and air kerma K{sub CT} at the CT scanner isocenter when the scan is repeated in the absence of the phantom. The authors define the KERMA ratio (R{sub K}) as K/ K{sub CT}, which were experimentally determined in a Male Rando Phantom using lithium fluoride chips (TLD-100). R{sub K} values were obtained for a total of 400 individual point locations, as well as for 25 individual organs of interest in CT dosimetry. CT examinations of Rando were performed on a GE LightSpeed Ultra scanner operated at 80 kV, 120 kV, and 140 kV, as well as a Siemens Sensation 16 operated at 120 kV. Results: At 120 kV, median R{sub K} values for the GE and Siemens scanners were 0.60 and 0.64, respectively. The 10th percentile R{sub K} values ranged from 0.34 at 80 kV to 0.54 at 140 kV, and the 90th percentile R{sub K} values ranged from 0.64 at 80 kV to 0.78 at 140 kV. The average R{sub K} for the 25 Rando organs at 120 kV was 0.61 {+-} 0.08. Average R{sub K} values in the head, chest, and abdomen showed little variation. Relative to R{sub K} values in the head, chest, and abdomen obtained at 120 kV, R{sub K} values were about 12% lower in the pelvis and about 58% higher in the cervical spine region. Average R{sub K} values were about 6% higher on the Siemens Sensation 16 scanner than the GE LightSpeed Ultra. Reducing the x-ray tube voltage from 120 kV to 80 kV resulted in an average reduction in R{sub K} value of 34%, whereas increasing the x-ray tube voltage to 140 kV increased the average R{sub K} value by 9%. Conclusions: In-patient to isocenter relative KERMA values in Rando phantom can be used to estimate organ doses in similar sized adults undergoing CT examinations from easily measured air KERMA values at the

  3. Substation grounding programs. Volume 5, Applications manual

    SciTech Connect (OSTI)

    Meliopoulos, A.P.S.

    1992-05-01

    This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 5, is an applications guide of the three computer programs. SOMIP, SMECC, and SGSYS, for the purpose of designing a safe substation grounding system. The applications guide utilizes four example substation grounding systems for the purpose of illustrating the application of the programs, SOMIP, SMECC, and SGSYS. The examples are based on data provided by four contributing utilities, namely, Houston Lighting and Power Company, Southern Company Services, Puget Sound Power and Light Company, and Arizona Public Service Company. For the purpose of illustrating specific capabilities of the computer programs, the data have been modified. As a result, the final designs of the four systems do not necessarily represent actual grounding system designs by these utilities. The example system 1 is a 138 kV/35 kV distribution substation. The example system 2 is a medium size 230 kV/115 kV transmission substation. The third example system is a generation substation while the last is a large 525 kV/345 kV/230 kV transmission substation. The four examples cover most of the practical problems that a user may encounter in the design of substation grounding systems.

  4. Substation grounding programs

    SciTech Connect (OSTI)

    Meliopoulos, A.P.S. . Electric Power Lab.)

    1992-05-01

    This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 5, is an applications guide of the three computer programs. SOMIP, SMECC, and SGSYS, for the purpose of designing a safe substation grounding system. The applications guide utilizes four example substation grounding systems for the purpose of illustrating the application of the programs, SOMIP, SMECC, and SGSYS. The examples are based on data provided by four contributing utilities, namely, Houston Lighting and Power Company, Southern Company Services, Puget Sound Power and Light Company, and Arizona Public Service Company. For the purpose of illustrating specific capabilities of the computer programs, the data have been modified. As a result, the final designs of the four systems do not necessarily represent actual grounding system designs by these utilities. The example system 1 is a 138 kV/35 kV distribution substation. The example system 2 is a medium size 230 kV/115 kV transmission substation. The third example system is a generation substation while the last is a large 525 kV/345 kV/230 kV transmission substation. The four examples cover most of the practical problems that a user may encounter in the design of substation grounding systems.

  5. Sundance Energy Project Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2001-06-29

    Sundance Energy LLC (Sundance) has applied to the Western Area Power Administration (Western) to interconnect a planned generator facility to Western's transmission system in the vicinity of Coolidge, Arizona. Western's proposed action is to enter into an interconnection and construction agreement with Sundance for the requested interconnection. The proposed interconnection would integrate the power generated by the Sundance Energy Project (Project) into the regional transmission grid and would allow Sundance to supply its power to the competitive electric wholesale market. The proposed Project would be built on private lands southwest of Coolidge. The proposed Project would be a ''peaking power plant project'' which means it would provide energy when it is needed during peak demand periods in the region. The proposed Project would also be a ''merchant plant'' which means it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the energy generated by the power plant. Western, as a major transmission system owner, must generally provide access to its transmission system when requested by an eligible organization per existing policies, regulations and laws. The proposed Project would consist of the construction and operation of a generating facility; construction of a 14-mile pipeline to supply natural gas to the proposed Facility; a new 230-kV bay at an existing substation; a new double-circuit 230-kV transmission line; a new single-circuit 230-kV transmission line; an upgrade of a 115-kV line to 230-kV specifications; and an upgrade of an existing substation. Three alternatives would consist of different locations of the 230-kV transmission lines and would not involve upgrading the 115-kV line or the existing substation. The environmentally preferred alternative is Alternative 3, the power line routing that is furthest west.

  6. Development of extruded and molded straight joint for ultra high-voltage XLPE cable

    SciTech Connect (OSTI)

    Shimomura, T.; Ando, K.; Asahi, K.; Sugiyama, K.

    1986-01-01

    In Japan, 154-kV crosslinked polyethylene-insulated cables (XLPE) are already in use for long-distance tranmission lines, but 275-kV XLPE cables are used only for short-distance lines (without joints) on the premises of power-generation plants and substations. 275-kV XLPE cable is expected to be used for long-distance transmission lines in the near future because of its overall cost advantage. To respond to this need, a straight-through joint with the same reliability as the cable should be developed. Reliable joints should be formed and molded with the same curable PE compounds as the cable insulation. At present, 154-kV XLPE cables for long-distance transmission lines are usually constructed with the joint comprising XLPE insulation wrapped with curable PE tape and molded by heating. However, this taped molded joint has the disadvantages of troublesome tape handling. On the other hand, extruded molded joints are constructed by injecting curable melted PE into a mold with an extruder, eliminating contamination. The report describes the characteristics of the extruded and molded joint developed for 154, 275 and 500 kV class XLPE cables.

  7. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Plug-In Electric Vehicle (PEV) Rebates The Driving Rhode Island to Vehicle Electrification (DRIVE) rebate program offers rebates of up to $2,500 for the purchase or lease of qualified PEVs. Rebates are offered on a sliding scale based on battery capacity, providing $2,500 for any vehicle with a battery capacity of 18 kilowatt-hours (kWh) or greater, $1,500 for any vehicle with a battery capacity between 7 and 18 kWh, and $500 for any vehicle with a battery capacity less than 7 kWh. Applicants

  8. Cost Reductions with Multi-Megawatt Centralized Inverter Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INTEGRATION Cost Reductions with Multi-Megawatt Centralized Inverter Systems Alencon Systems, LLC *99.1% Efficient Inverter System *Power Factor Control +/- 0.9 *2,500VDC *Low/Zero Voltage Ride Through *Compact Design *Liquid Cooling *Hot-Swap Capability *Lower Total Cost of Ownership *Large BOS System Savings Designed to be "Made in the USA" * Up to 25kW * String-wise MPPT * 300 to 1,000V DC Input Voltage * 2,500V DC Bi-polar Output Voltage * "Plug and Play" Topology *

  9. Buildings Energy Data Book: 7.4 Efficiency Standards for Commercial HVAC

    Buildings Energy Data Book [EERE]

    2 Efficiency Standards for Commercial Packaged Boilers Effective for products manufactured between January 1, 1994 and March 1, 2012 Combustion Efficiency (1) Gas-fired, with capacity ≥ 300,000 Btu/hr Not less than 80% Oil-fired, with capacity ≥ 300,000 Btu/hr Not less than 83% Effective for products manufactured on or after March 2, 2012 Size (Btu/hr) Efficiency Level (1) Gas-fired, hot water ≥300,000 and ≤2,500,000 80% thermal efficiency Gas-fired, hot water >2,500,000 82%

  10. Measurements of the asymmetric, dynamic sheath around a pulse biased sphere immersed in flowing metal plasma

    SciTech Connect (OSTI)

    Anders, Andre; Wu, Hongchen; Anders, Andre

    2008-06-13

    A long-probe technique was utilized to record the expansion and retreat of the dynamic sheath around a spherical substrate immersed in pulsed cathode arc metal plasma. Positively biased, long cylindrical probes were placed on the side and downstream of a negatively pulsed biased stainless steel sphere of 1" (25.4 mm) diameter. The amplitude and width of the negative high voltage pulses (HVP) were 2 kV, 5 kV, 10 kV, and 2 mu s, 4 mu s, 10 mu s, respectively. The variation of the probe (electron) current during the HVP is a direct measure for the sheath expansion and retreat. Maximum sheath sizes were determined for the different parameters of the HVP. The expected rarefaction zone behind the biased sphere (wake) due to the fast plasma flow was clearly established and quantified.

  11. Klondike III/Biglow Canyon Wind Integration Project; Record of Decision, October 25, 2006.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration

    2006-10-25

    The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE)1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects, BPA will build and operate a 12-mile long, 230-kilovolt (kV) double-circuit transmission line between the wind projects and BPA's new 230-kV John Day Substation in Sherman County, Oregon. BPA will also expand its existing 500-kV John Day Substation.

  12. Study of a Station Blackout Event in the PWR Plant

    SciTech Connect (OSTI)

    Ching-Hui Wu; Tsu-Jen Lin; Tsu-Mu Kao [Institute of Nuclear Energy Research P.O. Box 3-3, Longtan, 32500, Taiwan (China)

    2002-07-01

    On March 18, 2001, a PWR nuclear power plant located in the Southern Taiwan occurred a Station Blackout (SBO) event. Monsoon seawater mist caused the instability of offsite power grids. High salt-contained mist caused offsite power supply to the nuclear power plant very unstable, and forced the plant to be shutdown. Around 24 hours later, when both units in the plant were shutdown, several inadequate high cycles of bus transfer between 345 kV and 161 kV startup transformers degraded the emergency 4.16 kV switchgears. Then, in the Train-A switchgear room of Unit 1 occurred a fire explosion, when the degraded switchgear was hot shorted at the in-coming 345 kV breaker. Inadequate configuration arrangement of the offsite power supply to the emergency 4.16 kV switchgears led to loss of offsite power (LOOP) events to both units in the plant. Both emergency diesel generators (EDG) of Unit 1 could not be in service in time, but those of Unit 2 were running well. The SBO event of Unit 1 lasted for about two hours till the fifth EDG (DG-5) was lined-up to the Train-B switchgear. This study investigated the scenario of the SBO event and evaluated a risk profile for the SBO period. Guidelines in the SBO event, suggested by probabilistic risk assessment (PRA) procedures were also reviewed. Many related topics such as the re-configuration of offsite power supply, the addition of isolation breakers of the emergency 4.16 kV switchgears, the betterment of DG-5 lineup design, and enhancement of the reliability of offsite power supply to the PWR plant, etc., will be in further studies. (authors)

  13. Next Update: October 2010

    U.S. Energy Information Administration (EIA) Indexed Site

    (Various) Country - with Total (T) for sub- regions NERC Region NERC Sub-region Type Operating (kV) Design (kV) Month Year From Terminal To Terminal Length (Miles) Type Pole Type Pole Material Size (MCM) Material Bundling Arrangement Present Ultimate Company Code Company Name Organizational Type US ERCOT - AC 121-150 138 245 5 2015 Allen Switch West Plano 3.5 OH 0 0 0 0 0 0 0 44372 ONCOR I US ERCOT - AC 121-150 138 320 6 2012 Barney Davis Laguna 4.2 OH 0 0 0 0 0 0 0 3278 AEP/TCC I US ERCOT - AC

  14. EA-1844: Imperial Solar Energy Center South, California

    Broader source: Energy.gov [DOE]

    This Environmental Impact Report / Environmental Assessment (EIR/EA), prepared by Bureau of Land Management, evaluates the potential environmental impacts from two CSOLAR Development, LLC, right-of-way (ROW) applications to construct, operate, and maintain a 230-kV transmission line and a road ROW across Federal lands along the Westside Main Canal. The electric generating facility would connect to the Imperial Valley Substation via a 230-kV transmission line and access to the facility would be along the Westside Main Canal. DOE is a cooperating agency. NOTE: DOE's plans to adopt the EA are cancelled because the applicant withdrew from the program.

  15. Great Northern Transmission Line Project Draft Environmental Impact Statement_Volume II

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    O Agricultural Impact Mitigation Plan (AIMP) Example ITCM Minnesota - Iowa 345 kV Transmission Line Project: Final Environmental Impact Statement Appendix O Agricultural Impact Mitigation Plan O-1 ITC Midwest LLC Agricultural Impact Mitigation Plan Minnesota - Iowa 345 kV Transmission Project and Associated Facilities in Jackson, Martin, and Faribault Counties Docket Nos. ET6675/CN-12-1053 & ET6675/TL-12-1337 April 29, 2014 ITC Midwest's DEIS Comment Letter E X A M P L E ITCM Minnesota -

  16. February 16, 2007

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    [mailto:swalexander@pepco.com] Sent: Thursday, February 15, 2007 11:45 AM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. To Whom It May Concern: On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage

  17. Microsoft PowerPoint - Subregion 3 Presentation 5-12-09.ppt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Southwest Power Pool Sub-Regional Planning Meeting Sub-Regional Area 3 David Sargent May 12, 2009 Southwestern Power Administration Slide 2 Southwestern Power Administration Slide 3 Five Year Construction Plan 2009 Bull Shoals Dam Bus Upgrade - from 600 to 1200/2000 amps The bus is a limiting element for the line going from Bull Shoals toward Harrison. New Madrid 161/69 kV Autotransformer Replacement New Madrid-Malden-Piggott-Kennett 69 kV Line Rebuild - 55 miles of line collapsed during an ice

  18. Silicon Carbide JFET Switch

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5kV Enhancement-Model Silicon Carbide JFET Switch The novel 6.5kV SiC device and power module represent the world's highest-voltage module based on reliable, normally-off SiC JFETs. It reduces switching losses over that of Si-IGBTs by a factor of 20 and exhibits the fastest turn- on and turn-off of any 6.5kV-rated power module. Another major aspect of what makes this product unique is USCi's development and manufacturing approach. JFETs are simple transistor switches, yet for SiC materials, a

  19. Nuclear Navy United States Atomic Energy Commission Historical Advisory

    Energy Savers [EERE]

    Department of Energy In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station (13.36 KB) More Documents

  20. Price hub","Trade date","Delivery start date","Delivery

    U.S. Energy Information Administration (EIA) Indexed Site

    "application/vnd.ms-excel","application/vnd.ms-excel",55,53,54.29166667,12.54,24000,29,15 "ERCOT North 345KV Peak","application/vnd.ms-excel","application/vnd.ms-excel","application/vnd.ms-excel",41.5,40.5,41.0483871,-13.24,24800,29,15 "ERCOT North 345KV Peak","application/vnd.ms-excel","application/vnd.ms-excel","application/vnd.ms-excel",41.5,40.75,41.16666667,0.12,7200,9,11 "ERCOT North

  1. Electric Power Annual 2011

    U.S. Energy Information Administration (EIA) Indexed Site

    Capacity Conductor Characteristics Data Year Country NERC Region NERC Sub- region Type Operating (kV) Design (kV) Rating (MVa) Month Year From Terminal To Terminal Length (Miles) Type Pole Type Pole Material Size (MCM) Material Bundling Arrange- ment Present Ultimate Company Code Company Name Organizational Type Ownership (Percent) Project Name Level of Certainty Primary Driver 1 Primary Driver 2 2011 US TRE ERCOT AC 300-399 5 2018 DeCordova Benbrook 27 OH 44372 Delivery 100 00TPIT0004

  2. Microsoft Word - Cover Page - Exhibit 5

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Northern Pass Project Chart of Proposed Structure Heights 1 3 3 6 21 29 40 22 20 12 18 10 14 14 29 26 26 14 7 4 0 1 0 0 0 3 29 66 148 244 291 190 121 57 45 24 17 7 6 1 0 0 0 0 0 50 100 150 200 250 300 350 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 Structure Quantity Structure Height EXHIBIT 5 Project Structure Height Breakdown - HVDC & 345-kV HVDC Structures 345-kV Structures 27-JUN-2013

  3. Microsoft Word - Document1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    kksullivan@pepco.com <kksullivan@pepco.com> To: #DOE_Notification@pepco.com<#DOE_Notification@pepco.com Sent: Thu May 31 16:08:31 2007 Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: One of the two new 230kV transmission lines - xxxxx into Potomac River substation is scheduled to be energized on Thursday May 31, 2007. This circuit will not carry load for the first (2) days after being energized for test purposes. On Saturday June

  4. Microsoft Word - Document1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sent: Friday, June 22, 2007 1:07 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station In accordance with DOE Order No. 202-07-02, Pepco is required to provide notification of any and all 230kV planned and unplanned outages at Potomac River Generating Station. To Whom It May Concern: On Sunday June 24, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23107 high voltage circuit between Palmers Corner

  5. Superconducting accelerator cavity with a heat affected zone having a higher RRR

    DOE Patents [OSTI]

    Brawley, John; Phillips, H. Lawrence

    2000-01-01

    An improved method for welding accelerator cavities without the need for time consuming and expensive faying surface treatments comprising electron beam welding such cavities in a vacuum welding chamber within a vacuum envelope and using the following welding parameters: a beam voltage of between about 45 KV and 55 KV; a beam current between about 38 ma and 47 ma; a weld speed of about 15 cm/min; and a sharp focus and a rhombic raster of between about 9 KHz and 10 Khz. A welded cavity made according to the method of the present invention is also described.

  6. CX-007143: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Categorical Exclusion Determination CX-007143: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230-kilovolt (kV) transmission line on its Empire-Electrical District #5 115-kV transmission line, within Western's existing right-of-way. This will

  7. Next Update: November 2016 Geographic Area Capacity In-Service

    U.S. Energy Information Administration (EIA) Indexed Site

    Geographic Area Capacity In-Service Data Year NERC Region Type Operating (kV) Design (kV) Rating (MVa) Month/Year From Terminal To Terminal Length (Miles) Type Company Code Company Name Organizational Type Ownership (Percent) Project Name Level of Certainty Primary Driver 1 Primary Driver 2 2014 FRCC AC 200-299 115 460 1/2016 SUB 4 230.00 SUB 7 230.00 3.8 OH 18445 of Tallahassee M 100% 0.00 - SUB 7 230.00 Under Constructio Reliability 2014 FRCC AC 100-120 115 232 12/2016 Sub 14 115 Sub 7 115 6.0

  8. Breaking New Ground in Membrane Protein Research | Argonne Leadership

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Computing Facility Atomic model for the simulation of the KvAP channel in a lipid membrane. Atomic model for the simulation of the KvAP channel in a lipid membrane. The model represents the channel in an open activated state as determined by EPR experiments from the laboratory of Eduardo Perozo (The University of Chicago). The atomic model comprises 964 amino acids, 302 lipid molecules, 12,046 water molecules, and 53 K+ and Cl- ion pairs. In total, there are 112,798 atoms in the system. The

  9. CX-007131: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    31: Categorical Exclusion Determination CX-007131: Categorical Exclusion Determination Casa Grande-Empire Double Circuit Upgrade and Structure Replacement CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230- kilovolt (kV) transmission line on its Casa Grande-Empire 115-kV transmission line, from Thornton Road to its Empire Substation,

  10. CX-007148: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    48: Categorical Exclusion Determination CX-007148: Categorical Exclusion Determination Gila Substation Electrical Equipment Replacement CX(s) Applied: B4.6 Date: 05/03/2011 Location(s): Yuma County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace a 34.5-kilovolt (kV) circuit breaker within the fenced area of Gila Substation. This will consist of removing the existing 34.5-kV circuit breaker and foundation, trenching to add control cables

  11. Soda Lake Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    of Reservoir: 1219 m1.219 km 0.757 mi 3,999.344 ft 1,333.111 yd 1 Average Depth to Reservoir: 762 m0.762 km 0.473 mi 2,500 ft 833.331 yd Use the "Edit with Form" button at...

  12. Alcator C-Mod Program C Mod Alcator

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Alcator Project Total 120 96 110 96 99 LANL Collaborations 560 427 540 427 425 U. Tx. FRC Collaborations 2,600 2,072 2,500 2,072 2,442 PPPL Collaborations 1,995 1,480 1,485...

  13. CX-001180: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement ProjectCX(s) Applied: B1.3Date: 03/15/2010Location(s): Snohomish County, WashingtonOffice(s): Bonneville Power Administration

  14. 1st Quarter 2016 Domestic Uranium Production Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Figure 1. Uranium concentrate production in the United States, 1996 - 1st quarter 2016 pounds U 3 O 8 0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 ...

  15. EECBG Success Story: Shining Energy-Saving LEDs on Utah Starry Nights

    Broader source: Energy.gov [DOE]

    Thanks to an Energy Efficiency and Conservation Block Grant (EECBG), Utah is replacing streetlights with efficient LEDs across 14 rural communities. About 2,500 streetlights will be replaced and could save the town 20% to 50% on electricity bills. Learn more.

  16. FMC Presentation December

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PLANNING 5,755 6,744 7,489 999 45 Sub-Total 13,677 16,785 16,297 2,500 Power Services Marketing and Business Support 46 POWER R&D 4,934 5,622 5,631 179 47 SALES & SUPPORT...

  17. Buildings Energy Data Book: 2.2 Residential Sector Characteristics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to 1,499 24% 1,500 to 1,999 16% 2,000 to 2,499 9% 2,500 to 2,999 7% 3,000 or more 11% Total 100% Source(s): EIA, 2005 Residential Energy Consumption Survey, Oct. 2008, Table HC1-3.

  18. US WNC MO Site Consumption

    Gasoline and Diesel Fuel Update (EIA)

    WNC MO Site Consumption million Btu 0 500 1,000 1,500 2,000 2,500 US WNC MO ... 9,000 12,000 15,000 US WNC MO Site Consumption kilowatthours 0 300 600 900 1,200 ...

  19. US SoAtl FL Site Consumption

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FL Site Consumption million Btu 0 500 1,000 1,500 2,000 2,500 US SoAtl FL ... 8,000 12,000 16,000 US SoAtl FL Site Consumption kilowatthours 0 500 1,000 1,500 ...

  20. US WSC TX Site Consumption

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    WSC TX Site Consumption million Btu 0 500 1,000 1,500 2,000 2,500 US WSC TX ... 8,000 12,000 16,000 US WSC TX Site Consumption kilowatthours 0 500 1,000 1,500 ...

  1. US MidAtl NY Site Consumption

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MidAtl NY Site Consumption million Btu 0 500 1,000 1,500 2,000 2,500 3,000 US ... 8,000 10,000 12,000 US MidAtl NY Site Consumption kilowatthours 0 250 500 750 1,000 ...

  2. US NE MA Site Consumption

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NE MA Site Consumption million Btu 0 500 1,000 1,500 2,000 2,500 3,000 US NE MA ... 8,000 10,000 12,000 US NE MA Site Consumption kilowatthours 0 250 500 750 1,000 ...

  3. CX-011831: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Wood Pole Replacements Along the Targhee Tap and Targhee-Drummond 115-kilovolt (kV) Transmission Line Rights-Of-Way CX(s) Applied: B1.3 Date: 01/29/2014 Location(s): Idaho Offices(s): Bonneville Power Administration

  4. EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line Project; Benton and Yakima Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuilding of the existing 34-mile Midway-Moxee transmission line and the proposed rebuilding and upgrading of the existing 26-mile Midway-Grandview transmission line. Both 115-kV lines originate at the BPA Midway Substation in Benton County and terminate in Yakima County.

  5. HIGH VOLTAGE ION SOURCE

    DOE Patents [OSTI]

    Luce, J.S.

    1960-04-19

    A device is described for providing a source of molecular ions having a large output current and with an accelerated energy of the order of 600 kv. Ions are produced in an ion source which is provided with a water-cooled source grid of metal to effect maximum recombination of atomic ions to molecular ions. A very high accelerating voltage is applied to withdraw and accelerate the molecular ions from the source, and means are provided for dumping the excess electrons at the lowest possible potentials. An accelerating grid is placed adjacent to the source grid and a slotted, grounded accelerating electrode is placed adjacent to the accelerating grid. A potential of about 35 kv is maintained between the source grid and accelerating grid, and a potential of about 600 kv is maintained between the accelerating grid and accelerating electrode. In order to keep at a minimum the large number of oscillating electrons which are created when such high voltages are employed in the vicinity of a strong magnetic field, a plurality of high voltage cascaded shields are employed with a conventional electron dumping system being employed between each shield so as to dump the electrons at the lowest possible potential rather than at 600 kv.

  6. EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada.

  7. CX-005383: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Elliot Substation Construction and Transmission Line 43.8kV Transmission LineCX(s) Applied: B4.11Date: 03/02/2011Location(s): Elliot, North DakotaOffice(s): Western Area Power Administration-Upper Great Plains Region

  8. EA-1863: Vegetation Management on the Glen Canyon-Pinnacle Peak Transmission Lines Spanning the Coconino National Forest, Coconino County, Arizona

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of updating the vegetation management and right-of-way maintenance program for Western’s Glen Canyon to Pinnacle Peak 345-kV transmission lines, which cross the Coconino National Forest, Coconino County, Arizona.

  9. EA-1961: Kalispell-Kerr Transmission Line Rebuild Project; Kalispell and Polson, Montana

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. The proposed action is to replace wood-pole structures and other line components and improve access roads.

  10. EIS-0124: Conrad-Shelby Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

  11. EIS-0090: Fort Peck-Havre Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of its proposed action to construct and operate a 230kV transmission line from Fort Peck to Havre, Montana, with three intermediate interconnecting substations.

  12. EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

  13. November 2012 Electrical Safety Occurrences

    Broader source: Energy.gov (indexed) [DOE]

    plug. X 4 10(2) 10 2 EM--PPPO-FBP- PORTSDD-2012- 0029 A trackhoe hit an overhead fiber optics line breaking two 13.8kV power poles near their bases. X R 10(3) 0 3 EM-ORO--UCOR-...

  14. Etching of Copper Coated Mylar Tubes With CF-4 Gas

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ecklund, Karl M.; Hartman, Keith W.; Hebert, Michael J.; Wojcicki, Stanley G.

    1996-04-01

    Using 5 mm diameter copper coated mylar straw tubes at a potential of 2.30 KV relative to a concentric 20 (mu)m diameter gold-plated tungsten anode, it has been observed that with very low flow rates of CF4-based gases the conductive copper cathode material may be removed entirely from the mylar surface.

  15. EIS-0296: South Oregon Coast Reinforcement Project, Coos Bay/North Bend, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration proposes to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division of Nucor Corporation, may build a new steel mill in the Coos Bay/North Bend, Oregon, area.

  16. CX-100575 Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Integrated 10kV SiC VSD and High-Speed MW Motor for Gas Compression Systems Award Number: DE-EE0007253 CX(s) Applied: A9, B3.6 Advanced Manufacturing Office Date: 03/18/2016 Location(s): NC Office(s): Golden Field Office

  17. CX-010683: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Glen Canyon Substation Stage 09- 50MVA 230/69KV Transformer addition CX(s) Applied: B4.11 Date: 07/02/2013 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  18. EIS-0294: Sutter Power Project, Sutter County, California

    Broader source: Energy.gov [DOE]

    This EIS analyzes Western Area Power Administration's (Western) decision to support Calpine Corporation (Calpine) to construct an electric generating facility and associated 230-kilovolt (kV) transmission line, approximately 3.5 miles in length, known as the Sutter Power Plant (SPP).

  19. Sk---

    Office of Legacy Management (LM)

    +' -'a-- 'ZS cw..tn;i. .-- Zo cezU2?siataa kjcs AA3 ks*sti lffti S *Ab *T*,& tmld kv ;ia-eGd aa t;v ryrs d t:* -ticIs;: e c3 eaizw2-L &4?ia, x,qZ-' y s +.-w * & & A& b L*z&-...

  20. RussiaSNL2-web.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... P(TW) E(kJ) t(ns) Load (MA) Vout (kV) P (TW) E (kJ) Modified for the Web This project studies transport problem computations in multiple-layer systems of various optical thickness ...

  1. CX-008716: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration

  2. CX-011835: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    St. Clair Loop in to Olympia-South Tacoma No.1 230-kilovolt (kV) Transmission Line CX(s) Applied: B4.11 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  3. EIS-0443: Project Financing for Southwest Intertie Project- South, Clark, Lincoln, Nye, and White Pine Counties, Nevada

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy (DOE), Western Area Power Administration, is considering whether to provide partial financing of the southern portion of the Southwest lntertie Project (SWIP-South) which consists of approximately 235 miles of 500- kilovolt (kV) transmission line.

  4. EIS-0267: BPA/Lower Valley Transmission System Reinforcement Project, Wyoming

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA and LVPL proposal to construct a new 115-kV line from BPA’s Swan Valley Substation near Swan Valley in Bonneville County, Idaho about 58 km (36 miles) east to BPA’s Teton Substation near Jackson in Teton County, Wyoming.

  5. CX-008697: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Sale of Line Mile 1 of the 115 Kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line CX(s) Applied: B1.24 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration

  6. EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line; Benton and Yakima Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuilding of the existing 34-mile Midway-Moxee transmission line and the proposed rebuilding and upgrading of the existing 26-mile Midway-Grandview transmission line. Both 115-kV lines originate at the BPA Midway Substation in Benton County and terminate in Yakima County.

  7. CX-007140: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Vegetation Removal and Access Road Maintenance along the existing Electrical District 2-Saguaro #2 115-kV transmission lineCX(s) Applied: B1.3Date: 03/21/2011Location(s): Pinal County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region

  8. Main Injector power distribution system

    SciTech Connect (OSTI)

    Cezary Jach and Daniel Wolff

    2002-06-03

    The paper describes a new power distribution system for Fermilab's Main Injector. The system provides 13.8 kV power to Main Injector accelerator (accelerator and conventional loads) and is capable of providing power to the rest of the laboratory (backfeed system). Design criteria, and features including simulation results are given.

  9. EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared this EA to evaluate potential environmental impacts of rebuilding approximately 28 miles of the Grand Coulee-Creston No. 1 115-kilovolt (kV) transmission line between Coulee Dam in Grant County and Creston in Lincoln County, Washington.

  10. EIS-0296: South Oregon Coast Reinforcement Project, Coos Bay/North Bend, Oregon

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's proposed action to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division of Nucor Corporation, may build a new steel mill in the Coos Bay/North Bend, Oregon, area.

  11. High-capacity single-pressure SF/sub 6/ interrupters. Final report

    SciTech Connect (OSTI)

    Rostron, J R; Berkebile, L E; Spindle, H E

    1983-05-01

    The object of this project was to design and develop a high-voltage, single-pressure, SF/sub 6/ interrupter with an interrupting capability of 120 kA at 145 kV with a continuous current rating of 5000 A and an interrupting time of 1.5 cycles or less. A second objective of 100 kA at 242 kV was added during the project. Mathematical models were used to extrapolate design requirements from existing data for 63 and 80 kA. Two model puffers, one liquid and the other gas, were designed and tested to obtain data at 100 kA. An interrupter, optimized on the basis of total prospective breaker cost, was designed using the mathematical models. A study was made of the construction materials to operate under the high-stress conditions in this interrupter. Existing high-speed movies of high-current arcs under double-flow conditions were analyzed to obtain more information for modeling the interrupter. The optimized interrupter design was built and tested. The interrupting capability confirmed calculations of predicted performance near current zero; however, the dielectric strength after interrupting these high-current arcs was not adequate for the 145-kV or the 242-kV ratings. The dielectric strength was reduced by hot gases flowing out of the interrupter. Valuable data have been obtained for modeling the SF/sub 6/ puffer interrupter for high currents.

  12. EA-1909: South Table Wind Farm Project, Kimball County, Nebraska

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed South Table Wind Project, which would generate approximately 60 megawatts from about 40 turbines, to Western’s existing Archer-Sidney 115-kV Transmission Line in Kimball County, Nebraska.

  13. CX-009197: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project CX(s) Applied: B1.3 Date: 09/24/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration

  14. Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-06-20

    BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

  15. EA-1937: Pacific Direct Intertie Upgrade Project; Lake, Jefferson, Crook, Deschutes, and Wasco Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared an EA that assesses the potential environmental impacts of a proposal to replace equipment at BPA’s Celilo converter station and upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from The Dalles, Oregon, to the Nevada-Oregon border.

  16. Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Klickitat County

    1995-09-01

    CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundations for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.

  17. Influence of process parameters on rolling-contact-fatigue life of ion plated nickel-copper-silver lubrication

    SciTech Connect (OSTI)

    Danyluk, Mike; Dhingra, Anoop

    2012-05-15

    In this paper, we present a connection between argon ion flux, element-mixing, and rolling contact fatigue (RCF) life of a thin film nickel-copper-silver lubricant on ball bearings. The film is deposited on the balls using an ion plating process and tested for RCF in high vacuum. The ion flux is measured using a Langmuir probe and the plane stress within the film during deposition is calculated using a thin film model. Experiments reveal that there is an inverse relationship between ion flux and RCF life for most deposition voltage and pressure combinations tested, specifically, 15.5-18.5 mTorr and 1.5-3.5 kV. For voltages up to 2.5 kV, RCF life decreases as ion flux increases due to increased compressive stress within the film, reaching as high as 2.6 GPa. For voltages between 2.5 and 3.5 kV, interlayer mixing of nickel and copper with the silver layer reduces RCF life due to contamination, even as ion flux and corresponding film compressive stress are reduced. A Monte Carlo-based simulation tool, SRIM is used to track collision cascades of the argon ions and metal atoms within the coating layers. At process voltages above 2.5 kV we observe elemental mixing of copper and nickel with the silver layer using Auger electron spectroscopy of coated steel and Si{sub 3}N{sub 4} balls. The authors conclude that an ion flux greater than 5.0 x 10{sup 14} cm{sup -2} s{sup -1} leads to reduced RCF life due to high film stress. In addition, process voltages greater than 2.5 kV also reduce RCF life due to contamination and interlayer mixing of nickel and copper within the silver layer.

  18. Enhanced INL Power Grid Test Bed Infrastructure – Phase I

    SciTech Connect (OSTI)

    Reid, Carol Ann; West, Grayson Shawn; McBride, Scott Alan

    2014-06-01

    Idaho National Laboratory (INL), a Department of Energy (DOE) laboratory, owns, operates, and maintains transmission and distribution power grid infrastructure to support the INL multi program mission. Sections of this power infrastructure, known as the INL Power Grid Test Bed, have been and are being used by government and industry to develop, demonstrate, and validate technologies for the modern grid, including smart grid, on a full scale utility test bed. INL’s power grid includes 61 miles of 140 MW, 138 kV rated electrical power transmission supplying seven main substations, each feeding a separate facility complex (or ‘city’) within the INL’s 890 square mile Site. This power grid is fed by three commercial utilities into the INL’s main control substation, but is operated independently from the commercial utility through its primary substation and command and control center. Within the INL complex, one of the seven complexes, the Critical Infrastructure Test Range Complex (CITRC), has been designated as the INL complex for supporting critical infrastructure research and testing. This complex includes its own substation and 13.8kV distribution network, all configurable and controlled by the INL research and development programs. Through investment partnership with the DOE Office of Electricity Delivery and Energy Reliability (DOE OE), INL is enhancing its existing distribution infrastructure to expand the types of testing that can be conducted and increase flexibility for testing configurations. The enhancement of the INL Power Grid Test Bed will enable development and full scale testing of smart-grid-related technologies and smart devices including testing interoperability, operational performance, reliability, and resiliency contribution at multiple distribution voltage classes, specifically 15kV, 25kV, and 35kV. The expected time frame for completion of the Phase I portion of the enhancement would be 4th quarter fiscal year (FY) 2015.

  19. Development of Site-Specific Soil Design Basis Earthquake (DBE) Parameters for the Integrated Waste Treatment Unit (IWTU)

    SciTech Connect (OSTI)

    Payne, Suzette

    2008-08-01

    Horizontal and vertical PC 3 (2,500 yr) Soil Design Basis Earthquake (DBE) 5% damped spectra, corresponding time histories, and strain-compatible soil properties were developed for the Integrated Waste Treatment Unit (IWTU). The IWTU is located at the Idaho Nuclear Technology and Engineering Center (INTEC) at the Idaho National Laboratory (INL). Mean and 84th percentile horizontal DBE spectra derived from site-specific site response analyses were evaluated for the IWTU. The horizontal and vertical PC 3 (2,500 yr) Soil DBE 5% damped spectra at the 84th percentile were selected for Soil Structure Interaction (SSI) analyses at IWTU. The site response analyses were performed consistent with applicable Department of Energy (DOE) Standards, recommended guidance of the Nuclear Regulatory Commission (NRC), American Society of Civil Engineers (ASCE) Standards, and recommendations of the Blue Ribbon Panel (BRP) and Defense Nuclear Facilities Safety Board (DNFSB).

  20. SU-E-T-297: Small Field Dosimetry for Superficial Lesions

    SciTech Connect (OSTI)

    Ying, J; Casto, B; Wang, S; Talyor, T; Wichman, A; Ku, L; Taylor, M

    2014-06-01

    Purpose: Kilo-voltage (kV) photons and low megavoltage (MeV) electrons are the most common options for treating small superficial lesions, but they present complex dosimetry. Using a tertiary lead shield may protect the surrounding critical structures. Our goal was to quantitatively evaluate the dosimetric impact resulting from applying tertiary shields on superficial lesions. Method: We directly compared the beam characteristics of 80 kV (0.8 mm Al) photon setup abutting the water phantom surface and 6 MeV electron setup at 100 cm SSD. Profiles and depth doses were acquired using a 3D scanning water tank and an ion chamber (active volume 0.01 cm{sup 3}). Beam profiles were scanned at Dmax. Three lead sheets (2 mm thickness) with 2.7, 2.2, and 1.6, cm diameter circular cutouts were fabricated and placed at the water surface for both photon and electron fields. Results: The penumbra (80% 20%) of the open 44 cm{sup 2} electron insert was 10.7 mm, compared to an average of 7.2 mm with the tertiary cutouts. The penumbra of the open kV photon beam was 2.8 mm compared to an average of 1.8 mm with the tertiary cutouts. For field widths 2.7, 2.2, and 1.6 cm, the flatness of the electron beams was 16%, 17.3%, and 21%, respectively, and for the kV photon beams was 1.4%, 2.3%, 3.3%, respectively. The electron depth dose (PDD) shifted shallower and the photon PDD shifted deeper as the field size became smaller. Conclusion: The penumbra of small electron fields can be improved by adding tertiary lead shields. Both modalities are clinically feasible; however, kV photons still offer sharper penumbra and better flatness than that of 6 MeV electrons with tertiary shielding. Thus, kV photons may still be a superior option for small superficial lesions.