National Library of Energy BETA

Sample records for 1905-0165 expiration date

  1. COST BREAKDOWN AWARD NO: START DATE: EXPIRATION DATE: FISCAL...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    COST BREAKDOWN AWARD NO: START DATE: EXPIRATION DATE: FISCAL YEAR BREAKDOWN OF FUNDS ELEMENTS FY FY FY FY FY TOTAL Direct Labor Overhead Materials Supplies Travel Other Direct...

  2. Microsoft Word - EIA-914 Instructions_Expiration Date 09202012...

    U.S. Energy Information Administration (EIA) Indexed Site

    ENERGY INFORMATION ADMINISTRATION OMB No. 1905-0205 Washington, DC 20585 Expiration Date: 09202012 INSTRUCTIONS for FORM EIA-914 MONTHLY NATURAL GAS PRODUCTION REPORT PURPOSE...

  3. Extending the antitrust exemption in the Energy Policy and Conservation Act. Hearing before the Committee on Energy and Natural Resources, United States Senate, Ninety-Seventh Congress, First Session on S. 573, a bill to extend the expiration date of section 252 of the Energy Policy and Conservation Act, March 2, 1981. [Publication No. 97-7

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    A proposed amendmnt (S. 573) to section 252 of the Energy Policy and Conservation Act extending the antitrust exemption expiration date from March 15 to December 31, 1981 is intended to protect US oil companies that are participating in an International Energy Agency program to reduce dependence on imported oil. If the exemption expires, the oil companies could withdraw from the oil-sharing network. The text of S. 573 is followed by statements of four witnesses, including one from the Justice Department to the effect that no adverse impacts on competition or small businesses were discerned. (DCK)

  4. Expired_Contracts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Expired Contracts U.S. Department of Energy Carlsbad Field Office Carlsbad Technical Assistance Contractor for the Waste Isolation Pilot Plant Contract Number DE-AT30-05EW03000 U.S. Department of Energy Carlsbad Field Office Management & Operating Contractor for the Waste Isolation Pilot Plant Contract Number DE-AC29-01AL66444 Fee Payment Information (Washington TRU Solutions, LLC) U.S. Department of Energy Carlsbad Field Office Transportation Contractors for the Waste Isolation Pilot Plant

  5. DATE:

    Broader source: Energy.gov (indexed) [DOE]

    DATE: February 1, 2012 TO: Procurement Directors FROM: Director, Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition...

  6. DATE:

    Broader source: Energy.gov (indexed) [DOE]

    38 DATE: May 03, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management...

  7. DATE:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    POLICY FLASH 2013-45 DATE: April 16, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and ...

  8. DATE:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    61 DATE: June 19, 2013 TO: Procurement Directors FROM: Director Policy Division Office of Procurement and Assistance Policy Office of Acquisition and Project Management SUBJECT: ...

  9. DATE:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 DATE: April 10, 2014 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management ...

  10. DATE:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 DATE: March 10, 2014 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management ...

  11. DATE:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-12 DATE: December 7, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management ...

  12. DATE:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4-35 DATE: July 09, 2014 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management ...

  13. DATE:

    Broader source: Energy.gov (indexed) [DOE]

    36 DATE: April 23, 2012 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management...

  14. DATE:

    Office of Legacy Management (LM)

    -RL5- DATE: September 13, 1990 TO: Alexander Williams (w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The...

  15. DATE:

    Office of Legacy Management (LM)

    a? ,itbd States Government memorandum Department of Energy DATE: APR 15 893 REPLY TO EM-421 (W. Williams, 903-8149) ATTN OF: Authorization for Remedial Action at the Former Associate Aircraft Site in SUBJECT: Fairfield, Ohio TO: W. Seay, DOE Oak Ridge Field Office The former Associate Aircraft Tool and Manufacturing, Inc., site at 3660 Dixie Highway, Fairfield, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Force Control Industries is

  16. Dated:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    cause appearing, IT IS HEREBY ORDERED: 1. The Schedule Scheduling Order is stayed pending execution of a settlement agreement and stipulated final order. Dated: ~ /,/ .,2015 Christopher T. Saucedo Hearing Officer 3 Complainant, v. UNITED STATES DEPARTMENT OF ENERGY, and NUCLEAR WASTE PARTNERSHIP, LLC, Respondents. No. HWB 14-21 (CO) CERTIFICATE OF SERVICE I hereby certify that a copy of the STIPULATED JOINT MOTION TO STAY THE SCHEDULING ORDER has been sent electronically to the following on May

  17. DATE:

    Office of Legacy Management (LM)

    DATE: AUG 12 1991 REPLY TO ATTN OF: EM-421 (J. Wagoner, 3-8147) SUBIECT: Elimination of the Duriron Company Site TO: The File I have reviewed the attached site summary and elimination recommendation for the Duriron Company Site in Dayton, Ohio. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the Ouriron Company Site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W.

  18. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2011 Buildings Energy Data Book March 2012 Prepared for the Buildings Technologies Program Energy Efficiency and Renewable Energy U.S. Department of Energy by D&R International, Ltd. under contract to Pacific Northwest National Laboratory This version is dated: March 2012 This document was designed for the internal use of the United States Department of Energy. This document will be occasionally updated and, therefore, this copy may not reflect the most current version. This document was

  19. Date

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Template Revised: 6/12/2014 Template Reviewed: 6/12/2014 Operated for the U.S. Department of Energy by Sandia Corporation P.O. Box 5800 MS-1461 Albuquerque, New Mexico 87185-1461 Date Contractor Name Address Attention: Based on our earlier discussions, the Contract Audit Department at Sandia Corporation, which operates Sandia National Laboratories (Sandia) will audit costs incurred through your fiscal year ending XXXXXX on the following contracts placed with your company: Contract(s) Type of

  20. DATE:

    Office of Legacy Management (LM)

    -RL5- DATE: September 13, 1990 TO: Alexander Williams (w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The purpose of this note is to provide the following with respect to the former American Machine and Foundry Company (AMF) in New York City, New York--FUSRAP Considered Site Recommendation (g/13/90). 1 he recommendation is to eliminate the AMF New York City sites. If you agree, then please return an "approved"

  1. DATE:

    Office of Legacy Management (LM)

    OOE F 1325.3 m e m o randum DATE: SEP 23 1988 Department of Energy IL_. 9 REPLY TO AlTN OF, NE-23 SUElJECT. Owner Searches for Potential Sites in Chicago IL, (7 TO: W . Cottrell, ORNL 0. Kozlouski, OTS W h ile in Chicago, Illinois, on September 13, 14, and 15, 1988, I drove to the suspected addresses of several potential FUSRAP sites. No owners were contacted during this activity because most of the work was done after normal working hours or while on the way to the airport when tim e would not

  2. Date:

    Office of Legacy Management (LM)

    Tetra Tech 3801 Automation Way, Suite 100, Fort Collins, CO 80525 Tel 970.223.9600 Fax 970.223.7171 www. tetratech.com Technical Memorandum To: Rick DiSalvo, Stephen Pitton, Mel Madril From: Jackie Blumberg, PE Company: U.S. Department of Energy Date: December 19, 2013 CC: Tom Chapel, PE; Amber Kauffman, PE Project No.: 114-181750 Re: OLF Berm Height Evaluation Using Site-Specific Data INTRODUCTION Tetra Tech performed statistical analyses on rainfall data collected at the Rocky Flats site over

  3. (Expired) Nationwide Limited Public Interest Waiver for LED Lighting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Expired) Nationwide Limited Public Interest Waiver for LED Lighting and HVAC Units: February 11, 2010 (Expired) Nationwide Limited Public Interest Waiver for LED Lighting and HVAC ...

  4. POLICY GUIDANCE MEMORANDUM #01 Documenting Hires Funded by ARRA (Expired)

    Broader source: Energy.gov [DOE]

    THIS GUIDANCE HAS EXPIRED Guidance on Documenting Hires funded by American Recovery and Reinvestment Act of 2009

  5. Posting Date: 28 May, 2015 Posting Close Date: TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    300M Estimated Period of Performance: 5 Years Estimated RFP/RFQ Release Date: 2 nd QTR 2018 Estimated Award Date: TBD Competition Type: TBD Buyer Contact Email: pia@lanl.gov Title: Staff Augmentation Services Description of Product or Service Required Staff Augmentation Services (Current subcontract expires 2019) * Current forecasted bid opportunities are subject to change or cancellation due to scope, mission, or funding requirements. * Some procurements are reserved for small businesses. Note

  6. Posting Date: 28 May, 2015 Posting Close Date: TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    700K Estimated Period of Performance: TBD Estimated RFP/RFQ Release Date: FY 2018 Estimated Award Date: TBD Competition Type: TBD Buyer Contact Email: m_armijo@lanl.gov Title: Poly Com Phones Description of Product or Service Required Poly Com Phones (Current subcontracts expires 2019) * Current forecasted bid opportunities are subject to change or cancellation due to scope, mission, or funding requirements. * Some procurements are reserved for small businesses. Note the competition type on the

  7. Posting Date: 28 May, 2015 Posting Close Date: TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Estimated Award Date: TBD Competition Type: TBD Buyer Contact Email: Itmartinez@lanl.gov Title: QA Support Description of Product or Service Required QA Support (Current subcontracts expires 2018) * Current forecasted bid opportunities are subject to change or cancellation due to scope, mission, or funding requirements. * Some procurements are reserved for small businesses. Note the competition type on the forecast matrix to determine if a procurement has been set aside or is open to fair and

  8. §1603 Treasury Grant Expiration. Industry Insight on Financing and Market Implications

    SciTech Connect (OSTI)

    Mendelsohn, Michael; Harper, John

    2012-06-01

    This study explores the likely project financing and market impacts from the expiration of the §1603 Program.

  9. POLICY GUIDANCE MEMORANDUM #02 Using Schedule A Hiring Authority for ARRA Positions (Expired)

    Broader source: Energy.gov [DOE]

    THIS GUIDANCE HAS EXPIRED Guidance on Using Schedule A Hiring Authority for American Recovery and Reinvestment Act of 2009

  10. OMB No. XXXX-XXXX Expiration Date: XX/XX/XXXX

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    same, only complete the physical address. For the PC Electronic Data Reporting Option (PEDRO) software, call (202) 586-9659. (See Form instructions, pg 1.) Comments: Identify any...

  11. OMB No. XXXX-XXXX Expiration Date: XX/XX/XXXX

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PART 1. RESPONDENT IDENTIFICATION DATA For the PC Electronic Data Reporting Option (PEDRO) software, call (202) 586-9659. (See Form instructions, pg 1.) OOG.SURVEYS@eia.doe.gov...

  12. OMB No. XXXX-XXX Expiration Date: XX/XX/XXXX

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BARGE, AND RAIL MOVEMENTS ACTIVITY SUMMARY For the PC Electronic Data Reporting Option (PEDRO) software, call (202) 586-9659. (See Form instructions, pg 1) Mailing Address of...

  13. OMB No. XXXX-XXXX Expiration Date: XX/XX/XXXX

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OF THE MONTH (Barrels per Calendar Day) For the PC Electronic Data Reporting Option (PEDRO) software, call (202) 586-9659. (See Form instructions, pg 1.) Mailing Address of...

  14. OMB No. XXXX-XXXX Expiration Date: XX/XX/XXXX

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    same, only complete the physical address. For the PC Electronic Data Reporting Option (PEDRO) software, call (202) 586-9659. (See Form instructions, pg 1) Month A completed form...

  15. OMB No. XXXX-XXXX Expiration Date: XX/XX/XXXX

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    using one of the following methods: For the PC Electronic Data Reporting Option (PEDRO) software, call (202) 586-9659. (See Form instructions, pg 1) Enter barrels to the...

  16. OMB No. XXXX-XXXX Expiration Date: XX/XX/XXXX

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    day following the end of the report month. For the PC Electronic Data Reporting Option (PEDRO) software, call (202) 586-9659. (See Form instructions, pg 1.) Month Forms may be...

  17. OMB No. XXXX-XXXX Expiration Date: XX/XX/XXXX

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    comment from another, press ALT+ENTER.) For the PC Electronic Data Reporting Option (PEDRO) software, call (202) 586-9659. (See Form instructions, pg 1.) Forms may be submitted...

  18. OMB No. XXXX-XXXX Expiration Date: XX/XX/XXXX

    Gasoline and Diesel Fuel Update (EIA)

    Product Code Input Production Stocks End of Week Oxygenates, Renewable Fuels, and Hydrocarbon Gas Liquids*: 003 Hydrocarbon Gas Liquids* 242 Consumer and Export Grade Propane...

  19. OMB No. XXXX-XXXX Expiration Date: XX/XX/XXXX

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    per Stream Day Quantity Used As Fuel or Feedstock Trucks Atmospheric Crude Oil Distillation Capacity PART 5. ATMOSPHERIC CRUDE OIL DISTILLATION CAPACITY AS OF JANUARY 1 1...

  20. OMB No. XXXX-XXXX Expiration Date: XX/XX/XXXX

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    888 Total 999 Pipeline stocks must be greater than or equal to stocks in tanks and underground storage in Part 7. Finished Motor Gasoline Pipeline Stocks + Gulf Coast (PADD 3)...

  1. Date | Open Energy Information

    Open Energy Info (EERE)

    Date Jump to: navigation, search Properties of type "Date" Showing 48 properties using this type. A Property:ASHRAE 169 End Date Property:ASHRAE 169 Start Date B Property:Building...

  2. DATE: | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DATE: DATE: PDF icon DATE: More Documents & Publications Policy Flash 2013-2 Policy Flash 2013-51 311 Notice Aquisition Letter 2013-05 Financial Assistance Letter 2013-03 ...

  3. Section 1603 Treasury Grant Expiration: Industry Insight on Financing and Market Implications

    SciTech Connect (OSTI)

    Mendelsohn, M.; Harper, J.

    2012-06-01

    In the wake of the 2008-2009 financial crises, tax equity investors largely withdrew from the market, resulting in stagnation of project development. In response, Congress established the Treasury grant program pursuant to Section 1603 of the American Recovery and Reinvestment Act (..Section..1603 Program) to offer a cash payment in lieu of a production and investment tax credit. This study addresses the likely project financing and market impacts from the expiration of the ..Section..1603 Program. The authors assembled an array of insights offered by financial executives active in the renewable energy (RE) market during conference panel discussions and in presentations, direct interviews, and email correspondences. This analysis found that the ..Section..1603 Program alleviated the need to monetize the tax credit incentives through specialized investors, helped lower the transaction and financing costs associated with renewable electricity projects, and generally supported an extensive build-out of renewable power generation capacity. With the expiration of the ..Section..1603 Program, smaller or less-established renewable power developers will have more difficulty attracting needed financial capital and completing their projects, development of projects relying on newer or 'innovative' technologies will likely slow as traditional tax equity investors are known to be highly averse to technology risk in the projects they fund, and, finally, projects relying on tax equity may be more expensive to develop due to higher transaction costs and potentially higher yields required to attract tax equity.

  4. Section 1603 Treasury Grant Expiration. Industry Insight on Financing and Market Implications

    SciTech Connect (OSTI)

    Mendelsohn, Michael; Harper, John

    2012-06-01

    In the wake of the 2008-2009 financial crises, tax equity investors largely withdrew from the market, resulting in stagnation of project development. In response, Congress established the Treasury grant program pursuant to Section 1603 of the American Recovery and Reinvestment Act (Section 1603 Program) to offer a cash payment in lieu of a production and investment tax credit. This study addresses the likely project financing and market impacts from the expiration of the Section 1603 Program. The authors assembled an array of insights offered by financial executives active in the renewable energy (RE) market during conference panel discussions and in presentations, direct interviews, and email correspondences. This analysis found that the Section 1603 Program alleviated the need to monetize the tax credit incentives through specialized investors, helped lower the transaction and financing costs associated with renewable electricity projects, and generally supported an extensive build-out of renewable power generation capacity. With the expiration of the Section 1603 Program, smaller or less-established renewable power developers will have more difficulty attracting needed financial capital and completing their projects, development of projects relying on newer or 'innovative' technologies will likely slow as traditional tax equity investors are known to be highly averse to technology risk in the projects they fund, and, finally, projects relying on tax equity may be more expensive to develop due to higher transaction costs and potentially higher yields required to attract tax equity.

  5. DATE: TO: FROM:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    POLICY FLASH 2015-30 DATE: TO: FROM: June 18, 2015 Procurement DirectorsContracting Officers -- Chief Contract and Financial Assistance Policy Division Office of Policy Office ...

  6. Nuclear Speed-Dating

    Broader source: Energy.gov [DOE]

    The future of nuclear energy needs smart, creative thinkers. That's why more than 120 experts met up last week to "speed-date" each other's ideas.

  7. Dating the Vinland Map

    ScienceCinema (OSTI)

    None

    2013-07-17

    Scientists from Brookhaven National Laboratory, the University of Arizona, and the Smithsonian Institution used carbon-dating technology to determine the age of a controversial parchment that might be the first-ever map of North America.

  8. DATE SUBMITTED: GRADE LEVEL:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    two total hours per visit. For more students than that, please plan a visit on another date. To make a request, please complete the form below and submit it to...

  9. SPECIAL DATE AND TIME

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SPECIAL DATE AND TIME Evolving views of the outer solar system: new insights from NASA's New Horizons mission's historic first Pluto fly-by Dr. Kimberly Ennico Smith NASA Ames ...

  10. History of Radiocarbon Dating

    DOE R&D Accomplishments [OSTI]

    Libby, W. F.

    1967-08-15

    The development is traced of radiocarbon dating from its birth in curiosity regarding the effects of cosmic radiation on Earth. Discussed in historical perspective are: the significance of the initial measurements in determining the course of developments; the advent of the low-level counting technique; attempts to avoid low-level counting by the use of isotopic enrichment; the gradual appearance of the environmental effect due to the combustion of fossil fuel (Suess effect); recognition of the atmosphere ocean barrier for carbon dioxide exchange; detailed understanding of the mixing mechanism from the study of fallout radiocarbon; determination of the new half-life; indexing and the assimilation problem for the massive accumulation of dates; and the proliferation of measurement techniques and the impact of archaeological insight on the validity of radiocarbon dates. (author)

  11. MEMORANDUfl J: FILE DATE

    Office of Legacy Management (LM)

    J: FILE DATE r so ---w------m FROM: 9. 34oyc -w---v----- SUBJECT: D3 Bo;s CL&;C J mL-;+J; - Rcc cap 049 'A :j: &336;s L-.fh w-f L-1 ALE"nirTE ---...

  12. DATE: TO: FROM:

    Office of Environmental Management (EM)

    8,, United ,tates Government Department of Energ memorandum DATE: October 3, 2003 Audit Report Number: OAS-L-04-01 REPLY TO ATTN OF: IG-35 (A03DC010) SUBJECT: Audit of "Audit of Resolution of Safety Deficiencies" TO: Assistant Secretary for Environmental Management Assistant Secretary for Environment, Safety and Health Director, Policy and Internal Controls Management Director, Office of Nuclear Energy, Science and Technology Director, Office of Science INTRODUCTION AND OBJECTIVE The

  13. DATE: REPLY TO

    Office of Legacy Management (LM)

    DOE F 1325.8 (NW ed States Governhent ilmemorandum DATE: REPLY TO ' bPfl29 1993 Al-fN OF: EM-421 (W. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at the Former Associate Aircraft Site, Fairfield, Ohio TO: Manager, DOE Oak Ridge Field Office This is to notify you that the Former Associated Aircraft Site in Fairfield, Ohio, is designated,for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). This notification does not constitute a FUSRAP baseline

  14. Issuance Date:: February

    Office of Legacy Management (LM)

    Issuance Date:: February 11, 1966 POST-SHOT HYDROLOGI C SAFETY 68296 VUF-1014 FINAL REPORT FALLON, NEVADA OCTOBER 26, 1963 Hazleton-Nuclear Science Corporation October 30, 1965 SPONSORED BY THE ADVANCED RESEARCH PROJECTS AGENCY OF THE DEPARTMENT OF DEFENSE AND THE U. S.ATOMIC ENERGY COMMISSION VELA UNIFORM PROJECT LEG A L NOTICE This report was prepared as an account of Government sponsored work. Neither the United States, nor the Commission, nor any person acting on behalf of the Commission: A.

  15. Posting Date: 3/15/2016 Posting Close Date: 4

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3/15/2016 Posting Close Date: 4 th QTR 2016 North American Industry Classification System (NAICS) code for the request: 236210 Estimated Subcontract/PO Value: TBD Estimated Period of Performance: TBD Estimated RFP/RFQ Release Date: 4 th QTR 2016 Estimated Award Date: TBD Competition Type: TBD Buyer Contact Email: shanej@lanl.gov Title: Transuranic (TRU) Liquid Waste (TLW) Project Description of Product or Service Required The Transuranic (TRU) Liquid Waste (TLW) Project is a congressionally

  16. Posting Date: July 16, 2015 Posting Close Date: TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 16, 2015 Posting Close Date: TBD North American Industry Classification System (NAICS) code for the request: 812332 Estimated Subcontract/PO Value TBD Estimated Period of Performance 8-03-15 Estimated RFP/RFQ Release Date: TBD Estimated Award Date: FY 2018 Competition Type: Open Buyer Contact Email: pbeauparlant@lanl.gov Title: Radioactive Laundry and Respirator Services Description of Product or Service Required Radioactive Laundry and Respirator Services * Current forecasted bid

  17. Posting Date: July 16, 2015 Posting Close Date: TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 16, 2015 Posting Close Date: TBD North American Industry Classification System (NAICS) code for the request: 812332 Estimated SubcontractPO Value TBD Estimated Period of...

  18. Dates Fact Sheet.cdr

    Energy Savers [EERE]

    DATES is a detection and security information/event management (SIEM) solution enabling asset owners to protect their energy control systems at the network, host, and device level from cyber attacks. DATES complements traditional, signature-based detection with multiple detection algorithms, including model- based and flow anomaly detection and cross-site attack correlation. The DATES detection and SIEM solution gives operators succinct and intuitive attack visualization, with attacks

  19. Dates Fact Sheet.cdr

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DATES complements traditional, signature-based detection ... the unique traffic characteristics of energy control ... zones, and alert incident class, enabling correlation and ...

  20. Property:Deployment Date | Open Energy Information

    Open Energy Info (EERE)

    Deployment Date Jump to: navigation, search Property Name Deployment Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:DeploymentDate&oldid...

  1. Property:Achievement Date | Open Energy Information

    Open Energy Info (EERE)

    Achievement Date Jump to: navigation, search Property Name Achievement Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:AchievementDate&ol...

  2. Posting Date: 28 May, 2015 Posting Close Date: TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    238210 Estimated Subcontract/PO Value: TBD Estimated Period of Performance: TBD Estimated RFP/RFQ Release Date: FY 2016 Estimated Award Date: TBD Competition Type: TBD Buyer Contact Email: brianhornung@lanl.gov Title: Fire Alarm Project Support Description of Product or Service Required Fire Alarm Project Support * Current forecasted bid opportunities are subject to change or cancellation due to scope, mission, or funding requirements. * Some procurements are reserved for small businesses. Note

  3. Hazard Communication Training - Upcoming Implementation Date...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hazard Communication Training - Upcoming Implementation Date for New Hazard Communication Standard Hazard Communication Training - Upcoming Implementation Date for New Hazard ...

  4. DATE:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Washington Public Power Supply System) (two wells ... notices, permits, easements, deed notifications, ... Figure C-6. 300 Area NW Fence Line Looking East into Queue. ...

  5. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CAES-061 292012 Rev. 04 CAES Microscopy & Characterization Suite (MaCS) Service Request Form Page 1 of 2 Contact Information: Requestor Name: *Researcher Name: Requestor Email:...

  6. DATE:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... document management system IHLW immobilized high-level waste ILAW immobilized low-activity waste ... and acceptance criteria IWFD integrated ... acceptance checklist process and is ...

  7. DATE:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    has been revised. The subject form has been posted on the DOE Financial Assistance web page on the Recipients Page under the Financial Assistance Forms and Information for...

  8. Date

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    that Sandia contracts are settled for a reasonable amount and that no instances of fraud related to these contracts is apparent. We will not report on the adequacy of your...

  9. DATE:

    Broader source: Energy.gov (indexed) [DOE]

    For questions concerning this policy flash, contact Kevin M. Smith at (202) 287-1614 or at Kevin.M.Smith@hq.doe.gov. Contracting Officers should contact their field counsel, the ...

  10. DATE:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... 2-15 2.8.7 Waste Temperature Control ......4-5 4.2.1 Waste Treatment and Immobilization Plant Low-Activity Waste Feed Receipt ...

  11. DATE:

    Office of Environmental Management (EM)

    Portaledge, March 2010 | Department of Energy Cyber Security Audit and Attack Detection Toolkit: Bandolier and Portaledge, March 2010 Cyber Security Audit and Attack Detection Toolkit: Bandolier and Portaledge, March 2010 This project of the cyber security audit and attack detection toolkit will employ Bandolier Audit Files for optimizing security configurations and the Portaledge event detection capability for energy control systems. By building configuration audit and attack detection

  12. DATE:

    Broader source: Energy.gov (indexed) [DOE]

    Briefing for Media and Retailers - Lighting eere.energy.gov 1 Consumer Light Bulb Changes: Briefing and Resources for Media and Retailers Briefing for Media and Retailers - Lighting eere.energy.gov 2 * Briefing: - To schedule interviews, please contact DOE Public Affairs at 202-586-4940 * Terms: - Lumens: Commonly a measure of brightness (technically "luminous flux") - CFL: Compact Fluorescent Lamp: The curly fluorescent bulbs - LED: Light Emitting Diode: more recently emerging

  13. DATE:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division F, Title I, Title II, and Title III ...

  14. DATE:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division D, Titles III and V, and Division E, ...

  15. Dated:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CERTIFICATE OF SERVICE I hereby certify that a copy of the STIPULATED JOINT MOTION TO STAY THE SCHEDULING ORDER has been sent electronically to the following on May 12, 2015:...

  16. DATE:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LLC Richland, WA 99352 U.S. Department of Energy Contract DE-AC27-08RV14800 EDTECN: UC: ... The IWFDP is integrated with the Baseline Case operating scenario documented in ORP-11242 ...

  17. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    environments. SECTION C. Environmental Aspects Potential Sources of Impact The action consists of purchasing equipment to be used in research and teaching. The action would...

  18. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12 SECTION A. Project Title: Reactor Power Up Rate, Compressor Replacement, Neutron Radiography Restore, Liquid Scintillation Counter - Texas A&M University SECTION B. Project Description Texas A&M will replace an existing 54-year old compressor to improve reliability of the reactor operation and purchase a liquid scintillator counter to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW

  19. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    42 SECTION A. Project Title: Innovative Manufacturing Process for Improving the Erosion/Corrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B. Project Description The objective of this project is to conduct the necessary design, processing, manufacturing, and validation studies to assess powder metallurgy/hot isostatic processing (PM/HIP) as a method to produce very large near-net shaped (NNS)

  20. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4-006 SECTION A. Project Title: Design of SC Walls and Slabs for Impulsive Loading - Purdue University SECTION B. Project Description Purdue University proposes to analytically investigation the behavior and strength of modular steel-plate composite (SC) slabs and floor systems, analytically investigate the behavior and performance of SC structures subjected to impulsive loading including blast effects, experimentally verify the findings of analytical investigations, and develop design

  1. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    09 SECTION A. Project Title: High Temperature Melt Solution Calorimeter: The Thermodynamic Characterization of Oxides n Nuclear Energy - Clemson University SECTION B. Project Description Clemson University proposes to purchase a High Temperature Melt Calorimeter that will support ongoing work to advance the fundamental understanding of high-temperature ceramic materials used in nuclear energy applications through the use of melt solution calorimetry resulting in uniquely determined experimental

  2. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Project Title: Enhance Nuclear Education and Training at Aiken Technical College SECTION B. Project Description Aiken Technical College proposes to purchase and install a flow loop trainer to educate and train students for careers in the nuclear industry. SECTION C. Environmental Aspects / Potential Sources of Impact Chemical Use/Storage / Chemical Waste Disposal - No waste is generated during the manufacturing process, however each machine is equipped with a closed loop system

  3. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Nuclear Engineering and Science Equipment for Strategic Fuels Analysis Research in the Nuclear and Radiological Engineering Program at the Georgia Institute of Technology SECTION B. Project Description Georgia Tech proposes to purchase and install an imaging system to go with the existing x-ray source in a fully equipped irradiation laboratory, addition of spectroscopic instruments to perform energy resolution measurements in supplement of imaging, and tissue

  4. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Development of a Research and Education Facility for Evaluation of Environmental Degradation of Advanced Nuclear Materials in Simulated LWR Conditions - University of Idaho SECTION B. Project Description The University of Idaho proposes to a) upgrade the existing static autoclave system in order to simulate the light water reactor conditions without contaminating the high temperature waster with corrosion products; b) install a rotating a cylinder system in the

  5. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Automated Chromatography System for Purification of New Reagents for An/Ln Extraction and Separation - Washington State University SECTION B. Project Description Washington State University proposes to purchase and install a Teledyne Isco CombiFlash Rf+ Luman with UV-Vis and Evaporative Light Scattering Detector to improve the current purification abilities for newly designed and synthesized organic ligands. SECTION C. Environmental Aspects / Potential Sources of

  6. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: In situ Raman Spectroscopy to Enhance Nuclear Materials Research and Education - University of Nevada Reno SECTION B. Project Description The University of Nevada Reno proposes to purchase and install a Raman Spectrometer on the existing water loop for in situ analysis of materials to be used to characterize the surface chemistry of various alloys, understand the effect of mechanical stress on corrosion behavior of alloys, and improve nuclear education at UNR. SECTION

  7. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Nuclear Materials Science and Instrumentation Research Infrastructure Upgrade at Pennsylvania State University SECTION B. Project Description Pennsylvania State University proposes to purchase and install an inductively coupled plasma - atomic emission spectrometer (ICP- AES), glass melting furnace and crucible, and data acquisition system for use in research and education. SECTION C. Environmental Aspects / Potential Sources of Impact Chemical Use/Storage / Chemical

  8. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Equipment for Education, Training, and Research in Advanced Instrumentation for Fluoride Salt Cooled High-Temperature Reactors (FHRs) at The Ohio State University SECTION B. Project Description Ohio State University proposes to purchase and install the equipment necessary to develop and benchmark a non-invasive velocity measurement technique for salt based on short-lived activation products decay, a Fourier Transform Infrared spectrometer to measure the optical

  9. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Impact Test Machine for Nuclear Containment Research - University of Houston SECTION B. Project Description The University of Houston proposes to upgrade the university's Universal Element Tester with an Impact Test Machine to advance the study on impact and shear behavior of the nuclear containment structure. SECTION C. Environmental Aspects / Potential Sources of Impact The action consists of purchasing equipment to be used in research and teaching. The action would

  10. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Title: Integrated Approach to Fluoride High Temperature Reactor (FHR) Technology and Licensing Challenges - Georgia Tech SECTION B. Project Description Georgia Tech, in collaboration with Ohio State University, Texas A&M, Texas A&M - Kingsville, Oak Ridge National Laboratory and several industry and international partners, proposes to follow an integrated approach to address several key technology gaps associated with fluoride high temperature reactors, thereby

  11. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Design/Prototype Fabricate Rail Car for High Rad Mat Transport - Kasgro Rail Corp. SECTION B. Project Description The purpose of this proposal is to obtain a certification from the American Association of Railroads (AAR) on a fully constructed and tested railcar system for transporting spent nuclear fuel (SNF). The transport system will allow transporting SNF by rail to occur at normal rail speeds thus eliminating delays on rail lines and all more rapid transport of

  12. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Electrically-Assisted Tubing Processes for Enhancing Manufacturability of Oxide Dispersion Strengthened Structural Materials for Nuclear Reactor Applications - Northwestern University SECTION B. Project Description Northwestern University, in collaboration with Los Alamos National Laboratory, proposes to enhance the formability of nanostructured ferritic alloys (NFAs) such that high-strength thin-walled claddings can be successfully and economically manufactured for

  13. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5-085 SECTION A. Project Title: Deep Borehole Field Test (DBFT) Characterization Borehole Drilling and Testing, Pierce County, N.D. - Battelle Memorial Institute SECTION B. Project Description The primary goal of the DBFT program is to drill a 5,000-meter-deep characterization borehole with a 3,000-meter open-hole section across crystalline bedrock, and to conduct scientific testing to characterize the hydrogeologic, geochemical, and geomechanical properties of the near-borehole host rock. The

  14. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Environmental Surveillance, Education, and Research Program - Wastren Advantage, Inc. SECTION B. Project Description Wastren Advantage, Inc. (WAI) proposes to continue the Environmental Surveillance, Education, and Research (ESER) program. Specific activities to be carried out may include, but are not limited to actions in the nature of sampling, collection, and characterization of air, water, soil, flora and fauna as well as measurement of ambient radiation levels.

  15. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6-002 SECTION A. Project Title: Experimental Verification of Post-Accident iPWR Aerosol Behavior - Electric Power Research Institute, Inc. SECTION B. Project Description EPRI proposes to perform a series of experiments to quantify the most influential decontamination factors and their effect on a class of integrated Pressurized Water Reactor (iPWR) containment designs. The experimental design and method includes development of a thermal hydraulic test loop with an integral reactor and

  16. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Solving Critical Challenges to Enable the Xe-100 Pebble Bed Advanced Reactor Concept - X Energy, LLC SECTION B. Project Description X Energy, in collaboration with BWXT Nuclear Energy, Inc. (BWXT), Oak Ridge National Laboratory (ORNL), Idaho National Laboratory (INL), and Oregon State University (OSU), proposes to leverage prior and current DOE programs and previous Xe-100 design investments to further key pebble-bed high temperature gas-cooled reactor (HTGR)

  17. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: DOE-EM Traineeship in Robotics - Carnegie Mellon University SECTION B. Project Description Carnegie Mellon University (CMU) proposes to develop an Environmental Management (EM) Traineeship in robotics. The traineeship will build on the existing core robotics curricula while introducing specialized topics that ensure a thorough understanding of EM-relevant concerns. The proposed program will also incorporate supervised research opportunities with CMU faculty advisors

  18. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Integrated Effects Testing & Molten Chloride Fast Reactor Development - Southern Company Services, Inc. SECTION B. Project Description Southern Company Services, in collaboration with TerraPower, LLC and Oak Ridge National Laboratory (ORNL), proposes to advance the technology readiness of the Molten Chloride Fast Reactor (MCFR) technology under development by TerraPower in support of commercial offering by 2035. To support the licensing, detail design, and

  19. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    09-001 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the

  20. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    02 SECTION A. Project Title: INL - Off-Road ATV Use In Support of Engineering Surveys SECTION B. Project Description The proposed action will allow for off-road ATV use near T-24 and T-25 at the Idaho National Laboratory Site. The ATV(s) will be used to survey in support of engineering design for a proposed upgraded haul road within the INL Site. Currently, an Environmental Assessment is being prepared to address upgrading either T-24 or T-25 to establish a site transportation route for the

  1. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: INL - Site Wide Well Abandonment Activities SECTION B. Project Description The proposed action will abandon inactive wells and injection wells at the Idaho National Laboratory (INL) Site. Wells and injection wells will be abandoned as per MCP-1442, MCP-3480 and the Idaho Department of Water Resources (IDWR) requirements, as applicable. The wells to be abandoned are located both within the INL facility boundaries and outside of the INL facility boundaries. The proposed

  2. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis

  3. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render CPP-684 Remote Analytical Laboratory (RAL) as a limited access area by removing existing operational functions that are currently performed in the facility. In general, the activities will involve (1) removing the need for building heat and overall reduction of power consumption; (2) converting the existing fire protection

  4. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2-005 SECTION A. Project Title: INTEC - U-233 Waste Stream Disposition SECTION B. Project Description The proposed action will transfer 171 drums of U-233 waste from the Advanced Mixed Waste Treatment Project (AMWTP) to INTEC for verification, treatment, and repackaging for final disposition at the Nevada National Security Site (NNSS). The U233 drums are a portion of waste historically managed as transuranic as part of the 1995 Idaho Settlement Agreement.The waste management actions will be

  5. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4-001 SECTION A. Project Title: INL - Idaho Completion Project Environmental and Regulatory Services Activities SECTION B. Project Description The proposed action addresses the site-wide sampling and monitoring and waste characterization sampling programs that support the Idaho Completion Project (ICP) operations. Actions include:  groundwater monitoring,  day-to-day monitoring activities (i.e., measurement of liquid or gaseous effluents for purposes of characterizing and quantifying

  6. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Spent Resin Removal and Addition of New Resin to Ion Exchange (IX) Columns Located at CPP- 666 SECTION B. Project Description The proposed action will transfer spent resins from hold tanks located inside CPP-666 to on-site vendor-owned and operated resin dewatering equipment (EnergySolutions), with off-site disposal of the dewatered resins at the Nevada National Security Site. This process is required to maintain water cleanliness and remove radionuclides and

  7. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Spent Resin Removal and Addition of New Resin to Ion Exchange (IX) Columns Located at CPP- 666 SECTION B. Project Description The proposed action will transfer spent resins from hold tanks located inside CPP-666 to on-site vendor-owned and operated resin dewatering equipment (EnergySolutions), with off-site disposal of the dewatered resins at the Nevada National Security Site. This process is required to maintain water cleanliness and remove radionuclides and

  8. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: TAN - Monitoring Well Drilling Actions SECTION B. Project Description Two new monitoring wells will be drilled in the spring of 2015 within the Test Area North facility. Both wells will be drilled to a total depth of approximately 280 ft. and will be completed with two vapor ports, two pumps, and an inflatable isolation packer. Depending on location, the annular space will be filled with bentonite, silica sand, and bentonite associated with the vapor port filter pack

  9. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: INTEC - CPP-603 Large Cask Adaptability SECTION B. Project Description DOE is responsible for the safe storage of Spent Nuclear Fuel (SNF) in its possession as well as obtaining data to verify the condition of SNF currently being stored in large storage casks at the INL Site. To meet this responsibility, DOE needs to open and examine the low-burnup SNF currently in long-term dry storage to verify the condition of the fuel and look for any degradation. DOE examined

  10. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6-001 SECTION A. Project Title: INTEC - Macroencapsulation/Overpack Operations in CPP-659 and CPP-1617 SECTION B. Project Description The proposed action will treat mixed low-level waste (MLLW) at the Idaho Nuclear Technology and Engineering Center (INTEC). The treatment process, macroencapsulation, will result in the waste stream meeting the treatment standards for debris and radioactive lead solids (RLS) for disposition at the Nevada National Security Site (NNSS). The macroencapsulation

  11. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance

  12. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    09-003 SECTION A. Project Title: Removal of Central Facilities Area (CFA)-661 Interior Walls and Mezzanine. SECTION B. Project Description The initial action to be covered under this Environmental Checklist will be removal of the mezzanines from CFA-661 to provide for material storage and work space for the National and Homeland Security (N&HS) Wireless Test Bed project. More specifically, this involves storage of electronic equipment, antennas and antenna masts, personnel supplies, and a

  13. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: MFC Dial Room Replacement Project SECTION B. Project Description: The proposed project is to construct and operate a new dial room at the Materials and Fuels Complex (MFC) to continue operation of the telecommunications system at the Idaho National Laboratory (INL). As part of the INL Private Branch Exchange (PBX) consolidation effort, the need to replace Central Facilities Area (CFA), Radioactive Waste Management Complex (RWMC), and Power Burst Facility (PBF) PBX

  14. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Characterization of Fluidized Beds via Pressure Fluctuation Analysis SECTION B. Project Description: The purpose of this work is to conduct research using pressure as a measure of performance for fluidized beds (spouted, bubbling, or slugging) at the Center for Advanced Energy Studies (CAES). The approach to this research activity consists of two main tasks: 1. Sieving the bed media with a motorized sieve shaker - sintered aluminosilicate spheres (used in the

  15. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated

  16. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more

  17. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent

  18. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the

  19. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical

  20. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background / Purpose & Need The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The Naval Reactor (NR) Casks, however, are approaching the end of their design life. In 1997, Bettis initiated a contract for construction of

  1. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EC Document No.: DOE-ID-INL-10-011 DIRECTIONS: Responsible Managers, Project Environmental Lead, and Environmental Support personnel complete this form by following the instructions found at the beginning of each section and submit to Environmental Support & Services (environmental.checklist@inl.gov). SECTION A. Project Title: CFA and ATR-Complex Analytical and R&D Laboratory Operation (Overarching) SECTION B. Project Description: This EC replaces overarching EC INL-05-017 due to changes

  2. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4

  3. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Materials and Fuels Complex (MFC) Infrastructure Upgrades - Technical Support Building SECTION B. Project Description: Materials and Fuels Complex (MFC) Infrastructure Upgrades - General The number of researchers and operators at the Materials and Fuels Complex has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require infrastructure upgrades (office space,

  4. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to

  5. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and operate a Gamma Radiation Detection System (GaRDS) capable of providing X-Ray images of incoming vehicles and delivery trucks. The scanner will be equipped with a 1 Ci Cobalt-60 gamma source and will be installed in building MFC-736. This security building is located on Taylor Blvd approximately one mile south of the

  6. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4-017 SECTION A. Project Title: Test Reactor Area (TRA)-653 Conference Room Modifications SECTION B. Project Description: The Advanced Test Reactor (ATR) Maintenance Shop, building Test Reactor Area (TRA)-653, located at the ATR Complex, has an upstairs conference room capable of being used as one large conference room or can be split into two conference rooms by a sliding curtain divider. The current configuration causes meeting interruptions due to the one available door limiting personnel

  7. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 of 2 CX Posting No.: DOE-ID-INL-14-018 SECTION A. Project Title: Materials and Fuel Complex (MFC)-782 Fire Sprinkler Installation SECTION B. Project Description: MFC-782 (Machine Shop) does not currently have a fire sprinkler system. In order to be in compliance with National Fire Protection Association (NFPA) requirements, an automated sprinkler system needs to be installed. The proposed project would consist of removing existing fire water line, drain line, potable water line, fire alarm

  8. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho National Laboratory Page 1 of 2 CX Posting No.: DOE-ID-INL-14-019 SECTION A. Project Title: Advanced Test Reactor (ATR) Electronic Message Board Installation SECTION B. Project Description: The scope of work for this project involves the installation of a new electronic information sign at the south end of the sidewalk by the guardhouse (Test Reactor Area [TRA]-658). The sign would be mounted on metal posts just south of the first sidewalk light pole. The new sign would be powered from the

  9. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Checklist Page 1 of 1 CX Posting No.: DOE-ID-INL-14-021 SECTION A. Project Description: Remote Closure Switch for Test Reactor Area (TRA)-786 Output Breaker SECTION B. Project Description: . The TRA-786 diesel generator output breaker has a high arc flash calculation that requires the operator to use heavy, cumbersome personal protective equipment (PPE) when closing the breaker. This breaker is located in the doorway of a trailer that is approximately 5 feet off the ground. There

  10. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE-ID-ICP-16-001 R1 SECTION A. Project Title: INTEC - Macroencapsulation/Overpack Operations in CPP-659 and CPP-1617, Rev. 1 SECTION B. Project Description The proposed action will treat mixed low-level waste (MLLW) at the Idaho Nuclear Technology and Engineering Center (INTEC). The treatment process, macroencapsulation, will result in the waste stream meeting the treatment standards for debris and radioactive lead solids (RLS) for disposition at the Nevada National Security Site (NNSS). The

  11. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6/23/2014 Rev. 20 Idaho National Laboratory Environmental Checklist Page 1 of 13 EC Document No.: INL-14-044 R1 DIRECTIONS: Responsible Managers, Principle Investigator/Researcher, Program Environmental Lead (PEL), and Environmental Support personnel complete this form by following the instructions found at the beginning of each section (A-G and the Approval' and Signature' blocks) and submit to Environmental Support & Services (see Environmental Points of Contact, NEPA/Environmental

  12. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at Raft River by the United States Geological Survey (USGS) in non-INL related work ... INL will collect samples of the tracers prior to injection to verify concentration, ...

  13. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    also need another wash sink in the East Bay. The current method of connecting to the internet using Local Area Network (LAN) cables is cumbersome and inefficient. There is not...

  14. DATE:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corporations Section 743 Any Payment for the Election for a Federal Office or to a Political Committee Section 3003 Reporting on Conference Spending 2 The FAL addresses the ...

  15. DATE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Team. The subcontractor will be required to have spill control equipment on site. A propane tank that will be relocated from CFA-666 to CFA-661 will have it's location...

  16. DATE:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Area Network at https:twins.labworks.orgtwinsdataFormsAbout.aspx Weast, et al, 1988, CRC Handbook of Chemistry and Physics, 68 th edition, CRC Press, Boca Raton, Florida. ...

  17. Request Log Closedl Date Yes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 FOIA - Request Log Closedl Date Yes 01 127106 Yes 02/23/06 Yes 04/05/06 Yes 04/03/06 Yes 04/03/06 Yes 05/22/06 Yes 35/30/06 - No. - 00 1 - 002 - 003 - 004 005 006 - 307 - Dated 01 125106 0211 6106 03/29/06 03/31 106 14/03/06 1511 8/06 )5/22/06 Date Rec'd 0 I I2 5/06 02/23/06 03130/06 0313 1 106 04/03/06 05/22/06 05/22/06 HQ or Dir. Direct Transfer from HQ Direct Trans from HQ Direct Direct Transfer 'rom HQ Subject Requesting a list of all your Procurement card holders Requesting copies of any

  18. Next Release Date: August 2013

    Gasoline and Diesel Fuel Update (EIA)

    in Renewable Energy Consumption and Electricity 2010 Release Date: December 11, 2012 Next Release Date: August 2013 Table 10. Renewable electric power sector net generation by energy source and State, 2009 (thousand kilowatthours) Landfill Gas/MSW Biogenic 1 Other Biomass 2 Alabama 12,535,373 - 2,050 245,980 - - - 248,030 12,783,403 Alaska 1,323,744 - - - - - 7,027 7,027 1,330,771 Arizona 6,427,345 18,299 - 136,641 - 14,145 29545 198,630 6,625,975 Arkansas 4,192,706 34,371 17,645 - - - - 52,016

  19. Posting Date: 28 May, 2015 Posting Close Date: TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Estimated Award Date: TBD Competition Type: TBD Buyer Contact Email: m_armijo@lanl.gov Title: Crowdsourcing Description of Product or Service Required Crowdsourcing * Current forecasted bid opportunities are subject to change or cancellation due to scope, mission, or funding requirements. * Some procurements are reserved for small businesses. Note the competition type on the forecast matrix to determine if a procurement has been set aside or is open to fair and reasonable competition. * LANL

  20. Property:StartDate | Open Energy Information

    Open Energy Info (EERE)

    StartDate Jump to: navigation, search This is a property of type Date. Pages using the property "StartDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County...

  1. Property:EndDate | Open Energy Information

    Open Energy Info (EERE)

    EndDate Jump to: navigation, search This is a property of type Date. Pages using the property "EndDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County...

  2. Next Release Date: August 2013

    Gasoline and Diesel Fuel Update (EIA)

    2012 Next Release Date: August 2013 Table 20. Total renewable net summer capacity by energy source and State, 2010 (megawatts) Landfill Gas/MSW 1 Other Biomass 2 Alabama 3,272 - - 583 - - - 583 3,855 Alaska 414 - - - - - 7 7 422 Arizona 2,720 4 - 29 - 20 128 181 2,901 Arkansas 1,341 9 6 312 - - - 326 1,667 California 10,141 292 97 639 2,004 475 2,812 6,319 16,460 Colorado 662 3 10 - - 41 1,294 1,348 2,010 Connecticut 122 159 - - - - - 159 281 Delaware - 8 - - - - 2 10 10 District of Columbia -

  3. P.R. No. * Date*

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Low Risk (Rev 5, 2/25/2014) P.R. No. * Date* Subcontract No. or PO No. * 1 EXHIBIT G LOW RISK SECURITY REQUIREMENTS G1.0 Definitions and Acronyms (Mar 2013) Definitions and acronyms may be accessed electronically at http://www.lanl.gov/resources/_assets/docs/Exhibit-G/exhibit-g-definitions-acronyms-green.pdf G2.0 Statements Applicable to Scope of Work (May 2013) CONTRACTOR represents that all of the statements listed below are factually correct and applicable to the scope of work (SOW) for this

  4. Property:NEPA ApplicationDate | Open Energy Information

    Open Energy Info (EERE)

    ApplicationDate Jump to: navigation, search Property Name NEPA ApplicationDate Property Type Date This is a property of type Date. Pages using the property "NEPA ApplicationDate"...

  5. Categorical Exclusion (CX) Determinations By Date | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CX(s) Applied: DOEEA-1914 National Renewable Energy Laboratory (NREL) Date: 072815 Location(s): CO Office(s): Golden Field Office July 21, 2015 CX-100313...

  6. Property:GEAReportDate | Open Energy Information

    Open Energy Info (EERE)

    the project. Pages using the property "GEAReportDate" Showing 1 page using this property. L Los Humeros III Geothermal Power Plant + 19 December 2013 + Retrieved from "http:...

  7. Property:OpenEI/PublicationDate | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Property Name OpenEIPublicationDate Property Type Date Description The date the resource was first published. Retrieved from "http:...

  8. Property:Geothermal/ProjectEndDate | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Property Name GeothermalProjectEndDate Property Type Date Description Project End Date Retrieved from "http:en.openei.orgw...

  9. Property:Geothermal/ProjectStartDate | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Property Name GeothermalProjectStartDate Property Type Date Description Project Start Date Retrieved from "http:en.openei.orgw...

  10. Property:Estimated End Date | Open Energy Information

    Open Energy Info (EERE)

    Estimated End Date Jump to: navigation, search Property Name Estimated End Date Property Type String Pages using the property "Estimated End Date" Showing 4 pages using this...

  11. Pretreated Slurries; Issue Date: August 2010; Revision Date: July 2011 (Version 07-08-2011)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Summative Mass Closure Laboratory Analytical Procedure (LAP) Review and Integration: Pretreated Slurries Issue Date: August 2010 Revision Date: July 2011 (Version 07-08-2011) J. Sluiter and A. Sluiter Technical Report NREL/TP-510-48825 Revised July 2011 Technical Report Summative Mass Closure NREL/TP-510-48825 Revised July 2011 Laboratory Analytical Procedure (LAP) Review and Integration: Pretreated Slurries Issue Date: August 2010 Revision Date: July 2011 (Version 07-08-2011) J. Sluiter and A.

  12. Property:File/CreationDate | Open Energy Information

    Open Energy Info (EERE)

    CreationDate Jump to: navigation, search Property Name FileCreationDate Property Type Date Description Original creation date for the file. Note that this is usually not the same...

  13. Property:NEPA RevisedApplicationDate | Open Energy Information

    Open Energy Info (EERE)

    RevisedApplicationDate Jump to: navigation, search Property Name NEPA RevisedApplicationDate Property Type Date This is a property of type Date. Pages using the property "NEPA...

  14. Property:NEPA ScopingInitiatedDate | Open Energy Information

    Open Energy Info (EERE)

    ScopingInitiatedDate Jump to: navigation, search Property Name NEPA ScopingInitiatedDate Property Type Date This is a property of type Date. Pages using the property "NEPA...

  15. Property:NEPA DecisionDocumentDate | Open Energy Information

    Open Energy Info (EERE)

    DecisionDocumentDate Jump to: navigation, search Property Name NEPA DecisionDocumentDate Property Type Date This is a property of type Date. Subproperties This property has the...

  16. Date Time Event Description/Participants Location

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated: 06112015 Date Time Event DescriptionParticipants Location Point of Contact 11 thru 12 All Day Meeting Todd Allen, deputy director of Science and Technology at INL, has...

  17. Categorical Exclusion (CX) Determinations By Date | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Air Conditioners RIN: 1904-AC82 CX(s) Applied: B5.1 EERE- Buildings Technology Program Date: 06172015 Location(s): Nationwide Office(s): Golden Field Office June 16, 2015...

  18. Date centerdTimes New Roman

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2010 DOE F 1325.8 (493) United States Government Department of Energy memorandum DATE: April 27, 2010 Audit Report Number: OAS-RA-L-10-04 REPLY TO ATTN TO: IG-32 (A10RA025)...

  19. Date centerdTimes New Roman

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: April 23, 2010 Audit Report Number: OAS-RA-L-10-03 REPLY TO ATTN OF: IG-34 (A09ID019)...

  20. Categorical Exclusion (CX) Determinations By Date | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Number: DE-EE0007137 CX(s) Applied: A9, B3.6, B3.11 Solar Energy Technologies Office Date: 09102015 Location(s): AL Office(s): Golden Field Office September 8, 2015 CX-100362...

  1. Categorical Exclusion (CX) Determinations By Date | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Products Award Number: DE-EE0006875 CX(s) Applied: B3.6 Bioenergy Technologies Office Date: 05152015 Location(s): CA Office(s): Golden Field Office May 15, 2015 CX-100243...

  2. Company Company Code Fiscal Year Submission Date

    U.S. Energy Information Administration (EIA) Indexed Site

    NAME: TITLE: SIGNATURE: DATE: Mail to: U.S. Department of Energy Financial Reporting System, EI-24 Attention: Robert Schmitt Forrestal Building, Room 2G-089 1000 Independence Ave., ...

  3. Willard Libby, Radiocarbon, and Carbon Dating

    Office of Scientific and Technical Information (OSTI)

    Willard Libby, Radiocarbon, and Carbon Dating Resources with Additional Information * Radiocarbon Dating Willard Libby Courtesy UCLA Photography 'Scientific discoveries of various magnitudes are constantly occurring in myriad fields of study. It is a rarity, however, to make a breakthrough that not only has an impact on an individual field but also revolutionizes scientific thought across multiple disciplines. Willard Frank Libby accomplished this feat. Libby first proposed his idea of carbon

  4. MEMORANDUM TO: FILE I' DATE---- SITE

    Office of Legacy Management (LM)

    I' DATE---- SITE -7Jwl-h-G' ALTERNATE NAME: ~------~~~~~~~~----~___________________N~~~: --------------------- CITY: ti -------------------------- STATE: YM/% ------ OWNER (S.) -----___ p==t: -zLL%ddk ----------- Curr="t: _-ti--A-i- ________ Owner contacted 0 yes &no; if yee, date contacted ----------_-- TYPE OF OPERATION ~~~------~~~~---- q Research & Development 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process 0 Thearetical Studies 0 Sample 84 Analysis 0 Facility

  5. Posting Date: 12/18/15 Posting Close Date: 1/4/16

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    815 Posting Close Date: 1416 North American Industry Classification System (NAICS) code for the request: 336211 Estimated SubcontractPO Value: TBD Estimated Period of...

  6. Posting Date: 12/17/15 Posting Close Date: 12/24/15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    715 Posting Close Date: 122415 North American Industry Classification System (NAICS) code for the request: 236220 Estimated SubcontractPO Value: TBD Estimated Period of...

  7. Computational Age Dating of Special Nuclear Materials

    SciTech Connect (OSTI)

    2012-06-30

    This slide-show presented an overview of the Constrained Progressive Reversal (CPR) method for computing decays, age dating, and spoof detecting. The CPR method is: Capable of temporal profiling a SNM sample; Precise (compared with known decay code, such a ORIGEN); Easy (for computer implementation and analysis).  We have illustrated with real SNM data using CPR for age dating and spoof detection. If SNM is pure, may use CPR to derive its age. If SNM is mixed, CPR will indicate that it is mixed or spoofed.

  8. Adv. Fossil Solicitation Part I Due Date | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fossil Solicitation Part I Due Date Adv. Fossil Solicitation Part I Due Date January 13, 2016 12:01AM to 11:59PM EST ADVANCED FOSSIL ENERGY PROJECTS SOLICITATION PART I DUE DATE ...

  9. Adv. Nuclear Solicitation Part I Due Date | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Solicitation Part I Due Date Adv. Nuclear Solicitation Part I Due Date March 16, 2016 12:01AM to 11:59PM EDT ADVANCED NUCLEAR ENERGY PROJECTS SOLICITATION PART I DUE DATE ...

  10. REEE Solicitation Part I Due Date | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    I Due Date REEE Solicitation Part I Due Date March 16, 2016 12:01AM to 11:59PM EDT RENEWABLE ENERGY AND EFFICENT ENERGY PROJECTS SOLICITATION PART I DUE DATE...

  11. Adv. Fossil Solicitation Part I Due Date | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fossil Solicitation Part I Due Date Adv. Fossil Solicitation Part I Due Date March 16, 2016 12:01PM to 11:59PM EDT ADVANCED FOSSIL ENERGY PROJECTS SOLICITATION PART I DUE DATE...

  12. Property:ASHRAE 169 Start Date | Open Energy Information

    Open Energy Info (EERE)

    Start Date Jump to: navigation, search This is a property of type Date. Pages using the property "ASHRAE 169 Start Date" Showing 25 pages using this property. (previous 25) (next...

  13. Property:ASHRAE 169 End Date | Open Energy Information

    Open Energy Info (EERE)

    End Date Jump to: navigation, search This is a property of type Date. Retrieved from "http:en.openei.orgwindex.php?titleProperty:ASHRAE169EndDate&oldid21585...

  14. POLICY GUIDANCE MEMORANDUM #04 Setting Effective Date for New...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    04 Setting Effective Date for New Hires POLICY GUIDANCE MEMORANDUM 04 Setting Effective Date for New Hires The purpose of this memorandum is to establish the Department of...

  15. NEMA Lighting, CCE Overview and Update presentation, dated 05...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lighting, CCE Overview and Update presentation, dated 05252011. NEMA Lighting, CCE Overview and Update presentation, dated 05252011. This document is the U.S. Department of ...

  16. Property:FERC License Issuance Date | Open Energy Information

    Open Energy Info (EERE)

    Issuance Date Jump to: navigation, search Property Name FERC License Issuance Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense...

  17. Franklin retirement date is set: 04/30/2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Announcements Franklin retirement date is set: 04302012 Franklin retirement date is set: 04302012 March 6, 2012 by Helen He The Franklin (and its external login node...

  18. Property:FERC License Application Date | Open Energy Information

    Open Energy Info (EERE)

    FERC License Application Date Jump to: navigation, search Property Name FERC License Application Date Property Type String Retrieved from "http:en.openei.orgw...

  19. FAQ's for: ENERGY STAR Verification Testing Pilot Program dated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December 2010 FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December 2010 This document is the ...

  20. Jupiter Laser Facility Target Fab Request Requester: Date...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sketches: Jupiter Laser Facility Target Fab Request Requester: Date Requested: Phone or E-Mail: Date Required: Target Name: Reference : Laser System: Project: Task:

  1. Key Dates | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Key Dates Albert Einstein Distinguished Educator Fellowship (AEF) Program Einstein Fellowship Home Eligibility Benefits Obligations How to Apply Key Dates Frequently Asked...

  2. Posting Date: 5/3/16 Posting Close Date: 5/10/2016

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5/3/16 Posting Close Date: 5/10/2016 North American Industry Classification System (NAICS) code for the request: 236220 Estimated Subcontract/PO Value: TBD Estimated Period of Performance 8-10 Months Estimated RFP/RFQ Release Date: 5/16/2016 Estimated Award Date: 7/8/2016 Competition Type: Not Set-Aside Buyer Contact Email: Amyp@lanl.gov Title: Multi-purpose Conference, Tele-conference Building Description of Product or Service Required The objective of the construction contract is to create

  3. Supplier Information Form Date: New Revision

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Supplier Information Form Date: New Revision Interested suppliers may complete and submit a Supplier Information Form to be included into LANS' vendor database. Suppliers are advised that there is no guarantee any solicitations or awards will be sent to Supplier by submitting a Supplier Information Form; however, in the event a solicitation is sent to the Supplier from an LANS Procurement Official, then a more formal quotation/offer may be required. Legal Business Name: D/B/A: (if applicable)

  4. Low energy cyclotron for radiocarbon dating

    SciTech Connect (OSTI)

    Welch, J.J.

    1984-12-01

    The measurement of naturally occurring radioisotopes whose half lives are less than a few hundred million years but more than a few years provides information about the temporal behavior of geologic and climatic processes, the temporal history of meteoritic bodies as well as the production mechanisms of these radioisotopes. A new extremely sensitive technique for measuring these radioisotopes at tandem Van de Graaff and cyclotron facilities has been very successful though the high cost and limited availability have been discouraging. We have built and tested a low energy cyclotron for radiocarbon dating similar in size to a conventional mass spectrometer. These tests clearly show that with the addition of a conventional ion source, the low energy cyclotron can perform the extremely high sensitivity /sup 14/C measurements that are now done at accelerator facilities. We found that no significant background is present when the cyclotron is tuned to accelerate /sup 14/C negative ions and the transmission efficiency is adequate to perform radiocarbon dating on milligram samples of carbon. The internal ion source used did not produce sufficient current to detect /sup 14/C directly at modern concentrations. We show how a conventional carbon negative ion source, located outside the cyclotron magnet, would produce sufficient beam and provide for quick sampling to make radiocarbon dating milligram samples with a modest laboratory instrument feasible.

  5. Publication Dates | MIT-Harvard Center for Excitonics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Publication Dates 9.25.2014 2016 2015 2014 2013 2012 2011 2010 2009

  6. 2014 NEJC Save the Date (Spanish) | Department of Energy

    Energy Savers [EERE]

    Spanish) 2014 NEJC Save the Date (Spanish) 2014 National Environmental Justice Conference and Training Program Save the Date, March 26 to 28, 2014 PDF icon Save the Date (Spanish) More Documents & Publications 2013 National Environmental Justice Conference and Training Program 2014 NEJC Save the Date (English) STEP Brochure (Spanish)

  7. TT Coordinator Ltr dated May 13 2010 | Department of Energy

    Energy Savers [EERE]

    TT Coordinator Ltr dated May 13 2010 TT Coordinator Ltr dated May 13 2010 TT Coordinator Ltr dated May 13 2010 PDF icon TT_Coordinator_Ltr_dated_May_13_2010.pdf More Documents & Publications Technology Partnership Ombudsman - Roles, Responsibilities, Authorities and Accountabilities Technology Partnership Ombudsman - Roles, Responsibilities, Authorities and Accountabilities Microsoft Word - ADR Revised Policy82508Reformatted.doc

  8. United States Government Department of Energy DATE:

    Office of Legacy Management (LM)

    kE FJ325.8 d& * 9 -1 . (8-89) ZFG fO7440 1 United States Government Department of Energy DATE: DEC 2 3 :gg3 REPLY TO ATTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program TO: The File I have reviewed the attached site summaries and elimination recommendations for the following sites: e l Mitts & Merrel Co., Saginaw, Michigan l North Carolina State University, Raleigh, North Carolina l National Smelt &

  9. 2017 EJ Save the Date | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 EJ Save the Date 2017 EJ Save the Date Save the Date! March 8 through 10, 2017 2017 National Environmental Justice Conference and Training Program PDF icon SAVE THE DATE for the 2017 National Environmental Justice Conference and Training Program More Documents & Publications 2014 NEJC Save the Date (English) EIS-0333: Draft Environmental Impact Statement Conference Information: 2017 National Environmental Justice Conference and Training Program

  10. Version No.: 2002.001

    U.S. Energy Information Administration (EIA) Indexed Site

    ,,,,,,"OMB No. 1905-0175" ,,,..."Expiration Date: 12312017" ,,,..."Version No.: 2015.01" "MONTHLY REPORT OF ...

  11. REEE Solicitation Part II Due Date | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REEE Solicitation Part II Due Date REEE Solicitation Part II Due Date April 13, 2016 12:01AM to 11:59PM EDT RENEWABLE ENERGY AND EFFICENT ENERGY PROJECTS SOLICITATION PART II DUE...

  12. Adv. Nuclear Solicitation Part II Due Date | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Adv. Nuclear Solicitation Part II Due Date Adv. Nuclear Solicitation Part II Due Date April 13, 2016 12:01AM to 11:59PM EDT ADVANCED NUCLEAR ENERGY PROJECTS SOLICITATION PART II ...

  13. Save Energy, Save Date Night | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy, Save Date Night Save Energy, Save Date Night February 11, 2013 - 1:42pm Addthis Saving energy allows you to spend that money elsewhere. Saving energy allows you to spend ...

  14. NTSF Spring 2015 Save the Date | Department of Energy

    Office of Environmental Management (EM)

    Save the Date NTSF Spring 2015 Save the Date Please mark your calendar to attend the next meeting of the U.S. Department of Energy (DOE) National Transportation Stakeholders Forum (NTSF) scheduled for May 12-14, 2015. This annual event will be held at the Embassy Suites, located in downtown Albuquerque, NM. PDF icon Save the Date - NTSF 2015 More Documents & Publications NTSF Spring 2015 Registration Announcement NTSF Spring 2015 Save the Date Spring 2015 National Transportation Stakeholders

  15. Key Dates | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Key Dates DOE Office of Science Graduate Student Research (SCGSR) Program SCGSR Home Eligibility Benefits Participant Obligations How to Apply Information for Laboratory Scientists and Thesis Advisors Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A FeedbackShare Page The SCGSR Program Key Dates are noted below. At the submission deadline (shown in red), the online application system will close after which no additional materials will be accepted. The

  16. Adv. Nuclear Solicitation Part II Due Date | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Adv. Nuclear Solicitation Part II Due Date Adv. Nuclear Solicitation Part II Due Date November 23, 2016 12:01AM to 11:59PM EST ADVANCED NUCLEAR ENERGY PROJECTS SOLICITATION PART II DUE DATE Learn more about the Advanced Nuclear Energy Projects Solicitation

  17. Adv. Nuclear Solicitation Part II Due Date | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Solicitation Part II Due Date Adv. Nuclear Solicitation Part II Due Date October 19, 2016 12:01AM to 11:59PM EDT ADVANCED NUCLEAR ENERGY PROJECTS SOLICITATION PART II DUE DATE Learn more about the Advanced Nuclear

  18. REEE Solicitation Part II Due Date | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REEE Solicitation Part II Due Date REEE Solicitation Part II Due Date June 15, 2016 12:01AM to 11:59PM EDT RENEWABLE ENERGY AND EFFICENT ENERGY PROJECTS SOLICITATION PART II DUE DATE Learn more about the Renewable Energy and Efficent Energy Projects Solicitation

  19. Adv. Fossil Solicitation Part II Due Date | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Adv. Fossil Solicitation Part II Due Date Adv. Fossil Solicitation Part II Due Date June 15, 2016 12:01AM to 11:59PM EDT ADVANCED FOSSIL ENERGY PROJECTS SOLICITATION PART II DUE DATE Learn more about the Advanced Fossil Energy Projects Solicitation

  20. Categorical Exclusion (CX) Determinations By Date | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Date Categorical Exclusion (CX) Determinations By Date May 10, 2016 CX-100608 Categorical Exclusion Determination Supplemental Notice of Proposed Rulemaking (SNOPR) for Energy Conservation Standards for Residential Conventional Cooking Products RIN 1904-AD15 CX(s) Applied: B5.1 EERE-Buildings Technology Program Date: 05/10/2016 Location(s): Nationwide Office(s): Golden Field Office May 9, 2016 CX-100607 Categorical Exclusion Determination Notice of Proposed Rulemaking for New Energy Conservation

  1. 2016 EJ Save the Date | Department of Energy

    Energy Savers [EERE]

    Department of Energy 6 DOE Project Management Workshop - "Enhancing Project Management" 2016 DOE Project Management Workshop - "Enhancing Project Management" 20160407-doe-project-management-workshop-ADJUST-slide.png 2016 DOE Project Management Workshop

    EJ Save the Date 2016 EJ Save the Date Save the Date! March 9 to 12, 2016. 2016 National Environmental Justice Conference and Training Program and The Ninth Annual National Conference on Health Disparities PDF icon 2016

  2. FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2010 | Department of Energy FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December 2010 FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December 2010 This document is the FAQ's for the ENERGY STAR Verification Testing Pilot Program dated December 2010 PDF icon faq_final_december-2010.pdf More Documents & Publications Comment submitted by the Alliance for Water Efficiency (AWE) regarding the Energy Star Verification Testing Program DOE Verification

  3. Upcoming Implementation Date for New Hazard Communication Standard |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Upcoming Implementation Date for New Hazard Communication Standard Upcoming Implementation Date for New Hazard Communication Standard May 1, 2015 - 10:30am Addthis The upcoming implementation date for the new Hazard Communication Standard requires all Federal and Contractor employees with hazardous chemicals in their workplace must be in compliance with all modified revisions of this final rule, except: The distributors shall not ship containers labeled by the chemical

  4. NEMA Distribution Transformers, CCE Overview and Update presentation, dated

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    05/24/2011 | Department of Energy Distribution Transformers, CCE Overview and Update presentation, dated 05/24/2011 NEMA Distribution Transformers, CCE Overview and Update presentation, dated 05/24/2011 This document is the U.S. Department of Energys presentation titled NEMA Distribution Transformers, CCE Overview and UpdateŽ, date - May 24, 2011 PDF icon nema_distributiontransformers_presentation.pdf More Documents & Publications Energy Conservation Program for Consumer Products

  5. Key Dates | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Key Dates Visiting Faculty Program (VFP) VFP Home Eligibility Benefits Participant Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A FeedbackShare Page At the submission deadline (shown in red) the application system will close, and no materials will be accepted after the submission deadline has passed. The Application System closes at 5:00 PM Eastern Time. VFP Term: Summer 2015 On-line Application Opens October 15, 2015 Applications

  6. Dating of major normal fault systems using thermochronology-...

    Open Energy Info (EERE)

    Dating of major normal fault systems using thermochronology- An example from the Raft River detachment, Basin and Range, western United States Jump to: navigation, search OpenEI...

  7. "Title","Speaker","Publication Date","OSTI Identifier","Report...

    Office of Scientific and Technical Information (OSTI)

    Org.","Sponsoring Org.","Subject","Related Subject","DescriptionAbstract","Publisher","Country of Publication","Language","Format","Availability","Rights","System Entry Date"

  8. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    Date: 31-DEC-64","Maryland. Univ., College Park, MD (United States)","US Atomic Energy Commission (AEC)","PHYSICS; ANGULAR DISTRIBUTION; DEUTERON BEAMS; ELASTIC SCATTERING;...

  9. Property:Incentive/StartDateString | Open Energy Information

    Open Energy Info (EERE)

    Pages using the property "IncentiveStartDateString" Showing 25 pages using this property. (previous 25) (next 25) 3 30% Business Tax Credit for Solar (Vermont) +...

  10. Date Set for Closure of Russian Nuclear Weapons Plant - NNSA...

    National Nuclear Security Administration (NNSA)

    Date Set for Closure of Russian Nuclear Weapons Plant - NNSA Is Helping Make It Happen | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission ...

  11. Memorandum from Paul Bosco dated May, 20, 2012, Utlization of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paul Bosco dated May, 20, 2012, Utlization of the General Services Administration's Federal Strategic Sourcing Initiative Blanket Purchase Agreements Memorandum from Paul Bosco ...

  12. Memorandum from Daniel B. Poneman dated August 27, 2010, Strategic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Memorandum from Daniel B. Poneman dated August 27, 2010, Strategic Business Initiatives PDF icon Dep Sec Memo 082710.pdf More Documents & Publications Policy Flash 2015-10 - ...

  13. POLICY GUIDANCE MEMORANDUM #04 Setting Effective Date for New...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy's (DOE) policy for setting effective dates for newly hired employees and to ensure uniform application among DOE Headquarters, Elements and Field Human Resources Offices. ...

  14. DOE Guidance-Setting Effective Date for New Hires

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MEMORANDUM FOR HUMAN RESOURCES DIRECTORS FROM: SARA I. BONIL HUMAN CAPITAL OFFICER GUIDANCE MEMORANDUM4: SETTING EFFECTIVE DATE FOR NEW HIRES The purpose of this memorandum is to ...

  15. Oak Ridge Finishes Site's Largest Demolition Project to Date...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Constructed in 1954, the K-33 facility enriched uranium until 1985. The superstructure's demolition is the latest effort to convert ETTP into a private industrial park. To date, ...

  16. Detection and Analysis of Threatsto the Energy Sector (DATES...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DATES will provide control system operators with enhanced incident detection and alerting tools through rigorous monitoring of threats at the network, host, and device levels. ...

  17. Franklin retirement date is set: 04/30/2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Announcements » Franklin retirement date is set: 04/30/2012 Franklin retirement date is set: 04/30/2012 March 6, 2012 by Helen He The Franklin (and its external login node Freedom) retirement date has been set to April 30, 2012. Below are the related schedules: Effective immediately: Software frozen except for critical updates Mon Apr 2: No new accounts will be created Thurs Apr 26, 23:59: Batch system is drained, batch queues are stopped (no jobs will be running at this point) Mon Apr 30: Last

  18. From: MCKEOWN D To: Congestion Study Comments Date:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MCKEOWN D To: Congestion Study Comments Date: Friday, September 19, 2014 2:18:11 AM I am ... Energy Transmission Corridors. Thank you, Mary McKeown 3502 Highway M Moberly, MO 65270

  19. REEE Solicitation Part II Due Date | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    12:01AM to 11:59PM EST RENEWABLE ENERGY AND EFFICENT ENERGY PROJECTS SOLICITATION PART II DUE DATE Learn more about the Renewable Energy and Efficent Energy Projects Solicitation...

  20. Adv. Fossil Solicitation Part II Due Date | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    January 29, 2016 12:01AM to 11:59PM EST ADVANCED FOSSIL ENERGY PROJECTS SOLICITATION PART II DUE DATE Learn more about the Advanced Fossil Energy Projects Solicitation...

  1. REEE Solicitation Part II Due Date | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    12:01AM to 11:59PM EDT RENEWABLE ENERGY AND EFFICENT ENERGY PROJECTS SOLICITATION PART II DUE DATE Learn more about the Renewable Energy and Efficent Energy Projects...

  2. PLEASE NOTE THURSDAY DATE - COLLOQUIUM: Professor Ralph Roskies...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 23, 2013, 4:15pm to 5:30pm Colloquia MBG Auditorium PLEASE NOTE THURSDAY DATE - COLLOQUIUM: Professor Ralph Roskies - "Big Data at the Pittsburgh Supercomputing Center" ...

  3. United States Government Department of Energy Memorandum DATE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Memorandum DATE: AliNOF: SUBJECT: DEC 2 o 2010 NE-32 Delegation of Acquisition Executive (AE) Authority for the Material Security and Consolidation Project (08-D-702) ro: Richard...

  4. Property:Project Start Date | Open Energy Information

    Open Energy Info (EERE)

    Date" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects40MW Lewis project + 112012 + MHK ProjectsADM 3 + 112010 + MHK ProjectsADM 4 + 112010 +...

  5. Extension of the expiration date of Section 252 of the Energy Policy and Conservation Act. Hearing before the Committee on Energy and Natural Resources, United States Senate, Ninety-Seventh Congress, First Session on S. 1475, July 20, 1981. [International system

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    The text of S. 1475 to extend Section 252 of the Energy Policy and Conservation Act from September 30, 1981 to June 30, 1985 is followed by the statements of four administration witnesses and answers to questions posed to DOE by the committee. Testimony focused on the need for an extension and its duration. Section 252 authorizes the participation of US oil companies in an international oil-allocation system in the event of a supply disruption and limits antitrust actions against participating companies. The administration spokesmen supported the extension. (DCK)

  6. NTSF Spring 2013 Save The Date | Department of Energy

    Office of Environmental Management (EM)

    Services » Waste Management » Packaging and Transportation » National Transportation Stakeholders Forum » National Transportation Stakeholders Forum (NTSF) Charter » NTSF Spring 2013 Save The Date NTSF Spring 2013 Save The Date Please mark your calendar to attend the next meeting of the U.S. Department of Energy (DOE) National Transportation Stakeholders Forum (NTSF) scheduled for May 14-16, 2013. This annual event will be held at the Hyatt Regency Hotel, located near the downtown business

  7. TPA Change Package Dates in order with explanation.xlsx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    015-00 Milestone Series: Investigation Work on the Central Plateau Milestone TPA Milestone Language Explanation TPA Old Date TPA New Date Delay M-015-92A Submit a RCRA Facility Investigation/Corrective Measures Study and Remedial Investigation/Feasibility Study work plan for the 200-EA-1 operable unit (200 East Inner Area) to Ecology. 6/30/2015 9/30/2017 2 Years M-015-21A Submit a 200-BP-5 and 200-PO-1 OU Feasibility Study Report and Proposed Plan(s) to Ecology. 6/30/2015 6/30/2018 2 Years

  8. RADIOCARBON DATING, MEMORIES AND HOPES W.F, Libby

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RADIOCARBON DATING, MEMORIES AND HOPES W.F, Libby Department of Chemistry* and Institute of Geophysics and Planetary Physics, Uni^sjersity of California Los Angeles --(tm)- HISTORY The cosmic ray production of radiocarbon in matter is the basis of radiocarbon dating. It is made from the most abundant atom in air^nitrogen of mass fourteen. Radiocarbon-- carbon-l4 or C-- lasts 83OO years on the average (see note on radioactive decay for explanation on "half life" and "average

  9. Microsoft Word - Port of Call Dates.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - 3 1 Sep 1 2---14 Sep 2 6 - 2 8 Oct 1 0---12 ( Last P ort C all) Tentative Honolulu in port dates: May 1 5---16 May 2 9 --- 30 Jun 1 2---13 Jun 2 6 - 2 7 Jul 1 0 ---11 Jul 2...

  10. Save the Date: Office of Indian Energy Program Review

    Broader source: Energy.gov [DOE]

    Save the date for the Office of Indian Energy Program Review! The annual Program Review provides tribes with an opportunity to meet and learn from other tribes that are pursuing energy sufficiency and reduced carbon pollution through energy efficiency and/or renewable energy development, and to share in each other's successes.

  11. Property:OpenEI/UtilityRate/EndDate | Open Energy Information

    Open Energy Info (EERE)

    EndDate Jump to: navigation, search This is a property of type Date. Name: End Date Retrieved from "http:en.openei.orgwindex.php?titleProperty:OpenEIUtilityRate...

  12. Property:OpenEI/UtilityRate/StartDate | Open Energy Information

    Open Energy Info (EERE)

    StartDate Jump to: navigation, search This is a property of type Date. Name: Start Date Retrieved from "http:en.openei.orgwindex.php?titleProperty:OpenEIUtilityRate...

  13. NVN-018423 | Open Energy Information

    Open Energy Info (EERE)

    MGMT Lessee 1 WESTERN STATES GEOTHERMAL Lessee 2 none provided Effective Date 12131977 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action BID...

  14. Survey Date Agent CAS Limit Type TWA/STEL/Excur % OEL OEL Air...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Survey Date Agent CAS Limit Type TWASTELExcur % OEL OEL Air Conc Farm Specific Location ... Survey Date Agent CAS Limit Type TWASTELExcur % OEL OEL Air Conc Farm Specific Location ...

  15. Property:NEPA TMP/EISFederalRegisterDate | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search This is a property of type Date. Retrieved from "http:en.openei.orgwindex.php?titleProperty:NEPATMPEISFederalRegisterDate&oldid637471...

  16. Property:NEPA TMP/PreApplicationMeetingDate | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search This is a property of type Date. Retrieved from "http:en.openei.orgwindex.php?titleProperty:NEPATMPPreApplicationMeetingDate&oldid637468...

  17. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... MANAGEMENT DOE O 130.1 09291995 BUDGET FORMULATION PROCESS Expiration date ... Expiration date extended to 12312001 by DOE N 251.40. DOE O 205.1A 12042006 ...

  18. Template:BLM Geothermal Case | Open Energy Information

    Open Energy Info (EERE)

    - Date the lease expires (date) HBP - If the lease is producing, the lease is said to be "held by production" and there is no lease expiration so long as it continues to...

  19. Template:BLM Lease | Open Energy Information

    Open Energy Info (EERE)

    - Date the lease expires (date) HBP - If the lease is producing, the lease is said to be "held by production" and there is no lease expiration so long as it continues to...

  20. Age Dating of Mixed SNM--Preliminary Investigations

    SciTech Connect (OSTI)

    Yuan, D., Guss, P. P., Yfantis, E., Klingensmith, A., Emer, D.

    2011-12-01

    Recently we investigated the nuclear forensics problem of age determination for mixed special nuclear material (SNM). Through limited computational mixing experiments and interactive age analysis, it was observed that age dating results are generally affected by the mixing of samples with different assays or even by small radioactive material contamination. The mixing and contamination can be detected through interactive age analysis, a function provided by the Decay Interaction, Visualization and Analysis (DIVA) software developed by NSTec. It is observed that for mixed SNM with two components, the age estimators typically fall into two distinct clusters on the time axis. This suggests that averaging or other simple statistical methods may not always be suitable for age dating SNM mixtures. Instead, an interactive age analysis would be more suitable for age determination of material components of such SNM mixtures. This work was supported by the National Center for Nuclear Security (NCNS).

  1. Building Number/Name: Date prepared: Responsible Contractor:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2-AW Feb 10,2012 WRPS C M Smith; E A Hill PAST OPERATIONS Beryllium brought in facility: YES Form of beryllium: SOLID Period of beryllium operations (dates): Start: Early 1980s End: Present Location(s) in facility that contained beryllium materials: Tool Crib and adjacent Supply Room, and Mechanical Maintenance Area. Description of beryllium activities: Beryllium tools (beryllium-copper alloy containing about 2% beryllium) are stored in the Tool Crib and given to employees for use in Tank Farms,

  2. Building Number/Name: Date prepared: Responsible Contractor:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WA February 7, 2012 WRPS C M Smith; E A Hill PAST OPERATIONS Beryllium brought in facility: YES Form of beryllium: SOLID Period of beryllium operations (dates): Start: Early 1980s End: Present Location(s) in facility that contained beryllium materials: Tool Crib inside Maintenance Shop Supply Room Description of beryllium activities: Beryllium tools (beryllium-copper alloy containing about 2% beryllium) are stored in the tool crib and given to employees for use in Tank Farms. These tools are

  3. The Advancing Date of Spring Snowmelt in the Alaskan Artic

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Advancing Date of Spring Snowmelt in the Alaskan Arctic R. S. Stone and D. Longenecker Cooperative Institute for Research in Environmental Sciences University of Colorado Boulder, Colorado E. G. Dutton, J. M. Harris, and D. Longenecker National Oceanic and Atmospheric Administration Climate Monitoring and Diagnostics Laboratory Boulder, Colorado Abstract Since the mid-1960s the spring snowmelt has advanced by about 8 days in northern Alaska because of decreasing snowfall in winter and warmer

  4. 2014 NEJC Save the Date (English) | Department of Energy

    Energy Savers [EERE]

    4 NCSAM Campaign 2014 NCSAM Campaign banner-957163_960_720.jpg The theme for Cybersecurity Awareness Month 2014 was Securing the Internet of Things, sponsored by the Office of the Chief Information Officer (OCIO). Event highlights included presentations from industry leaders, information tables, and a vendor expo. More Documents & Publications FRONT BURNER - ISSUE 19 Cybersecurity Awareness Marketing/Promotional Material 2013 NCSAM Campaign

    English) 2014 NEJC Save the Date (English) 2014

  5. Home Energy Score: Analysis & Improvements to Date

    Energy Savers [EERE]

    Webinar Home Energy Score Webinar File webinar_homeenergyscore_20101117.wmv More Documents & Publications Home Energy Score Launch Commercial Building Energy Asset Score 2013 Pilot Home Energy Score Update Webinar Slides

    Home Energy Score: � Analysis & Improvements to Date � Joan Glickman Senior Advisor/Program Manager U.S. Department of Energy July 24, 2012 1 eere.energy.gov Presentation Overview 1) Background 2) Program Improvements 3) Analysis: Efficacy of Tool & Program -

  6. WEATHERIZATION PROGRAM NOTICE 16-XX EFFECTIVE DATE: SUBJECT: MULTIFAMILY WEATHERIZATION

    Energy Savers [EERE]

    6-XX EFFECTIVE DATE: SUBJECT: MULTIFAMILY WEATHERIZATION PURPOSE: To provide Grantees with consolidated guidance on previously issued Weatherization Program Notices (WPNs) on weatherizing multifamily buildings in the Weatherization Assistance Program (WAP). This supersedes WPN 10-7 and WPN 11-9 SCOPE: The provisions of this guidance apply to Grantees applying for financial assistance under the Department of Energy (DOE) WAP. LEGAL AUTHORITY: Title IV, Energy Conservation and Production Act, as

  7. ENERGY STAR Appliance Verification Testing- Pilot Program Summary Report dated February 3, 2012

    Broader source: Energy.gov [DOE]

    This document is ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012

  8. Organization Name Date Submitted File Name ACEEE Steve Nadel

    Energy Savers [EERE]

    Organization Name Date Submitted File Name ACEEE Steve Nadel 4/15/2011 ACEEE 4.15.2011 Alameda-Contra Coasta Transit District Chris Peeples 4/15/2011 Alameda-Contra Coasta Transit District 4.15.2011 American Academy of Arts and Sciences Robert W. Fri and Leslie C. Berlowitz 4/15/2011 American Academy of Arts and Science 4.15.2011 American Electric Power Michael L. Weinstein 4/15/2011 AEP 4.15.2011 American Gas Association, American Gas Foundation, American Public Gas Association, American Public

  9. Report No. U.S. Department of Eney Release Date:

    Energy Savers [EERE]

    No. U.S. Department of Eney Release Date: WR-B-95-06 Office of Inspector General May 5, 1995 Report on Audit of Construction of Protective Force Training Faciliti at the Pantex Plant This report can be obtained from the U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, Tennessee 37831 S tPrined wth soy ink n recycled pper U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL AUDIT OF CONSTRUCTION OF PROTECTIVE FORCE TRAINING FACILITIES AT THE PANTEX

  10. From: Madra Fischer To: Congestion Study Comments Date:

    Energy Savers [EERE]

    Madra Fischer To: Congestion Study Comments Date: Friday, October 03, 2014 2:38:30 PM I am writing to state my objection to the Rock Island Clean Line project. They want to cross my farm field at a diagonal angle to the mainline railroad and across TWO (2) gas pipelines which causes even more hazard and danger to me and my operators. This line has no funding in place, no wind farm to supply it and no customers on the East coast who want it. The cost to me as a landowner in Illinois is the

  11. Building Number/Name: Date prepared: Responsible Contractor:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3-E Jan 28, 2012 WRPS C M Smith; E A Hill PAST OPERATIONS Beryllium brought in facility: YES Form of beryllium: SOLID Period of beryllium operations (dates): Start: Early 1980s End: Present Location(s) in facility that contained beryllium materials: Tool Crib Description of beryllium activities: Beryllium tools (beryllium-copper alloy containing about 2% beryllium) are stored in a drawer in the tool crib and given to employees for use in Tank Farms. These tools are then returned to the tool

  12. Building Number/Name: Date prepared: Responsible Contractor:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    07-SX Jan 29, 2012 WRPS C M Smith; E A Hill PAST OPERATIONS Beryllium brought in facility: YES Form of beryllium: SOLID Period of beryllium operations (dates): Start: Early 1980s End: Mid 1990s Location(s) in facility that contained beryllium materials: Shop Description of beryllium activities: In July 2003, employees reported Beryllium tools (beryllium-copper alloy containing about 2% beryllium) may have been stored in the shop in the past. In the early 1990s, the building was used as a shop to

  13. Building Number/Name: Date prepared: Responsible Contractor:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    S Feb 10, 2012 WRPS C M Smith; E A Hill PAST OPERATIONS Beryllium brought in facility: YES Form of beryllium: SOLID Period of beryllium operations (dates): Start: Early 1980s End: Mid 1990s Location(s) in facility that contained beryllium materials: Shop Description of beryllium activities: In July 2003, employees reported Beryllium tools (beryllium-copper alloy containing about 2% beryllium) may have been stored in the shop in the past. Prior to the 1980s, the building was used as a Tank Farm

  14. COLLOQUIUM: NOTE SPECIAL DATE - THURSDAY: Unique Vulnerability of the New

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    York/New Jersey Metro Region to Hurricane Destruction - A New Perspective Based on Recent Research on Irene 2011 and Sandy 2012 | Princeton Plasma Physics Lab February 28, 2013, 4:15pm to 5:30pm Colloquia MBG Auditorium COLLOQUIUM: NOTE SPECIAL DATE - THURSDAY: Unique Vulnerability of the New York/New Jersey Metro Region to Hurricane Destruction - A New Perspective Based on Recent Research on Irene 2011 and Sandy 2012 Professor Nicholas K. Coch Queens College CUNY In the last two years. the

  15. DATE: REPLY TO Al-l' N OF: SUBJECT: TO:

    Office of Legacy Management (LM)

    oy&$= IL4 2%?5- EFG (07.90) ' Uni,ted bates Government memorandum Department of Energy /Em 7:3/ (5 2L-e DATE: REPLY TO Al-l' N OF: SUBJECT: TO: - MAR 1 1 1991 EM-421 Authority Determination-- Granite City Steel Site, Granite City, Illinois The File The attached review documents the basis for determining whether DOE has authority for taking remedial action at the Granite City Steel Site in Granite City, Illinois, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Betatron

  16. LED Watch: Is Your Design Already Out of Date?

    Energy Savers [EERE]

    lED WATCH James Brodrick IS YOUR DESIGN AlREADY OUt Of DAtE? Some ideas for guarding against lED obsolescence L ast year, the Burden Museum in Troy, NY, switched over to all-LED light- ing with the help of the U.S. Department of Energy's (DOE) Gateway demonstration program. By the time the conversion was implemented, 14 months had elapsed since specification, so a number of changes had to be made. One of the specified products had been withdrawn from the market because it had been having field

  17. Building Number/Name: Date prepared: Responsible Contractor:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    22-S February 2, 2012 WRPS C M Smith; E A Hill PAST OPERATIONS Beryllium brought in facility: YES Form of beryllium: LIQUID matrix Period of beryllium operations (dates): (1) Start: 1960 End: 1960; and (2) in early 1970s but not later than 1975. Location(s) in facility that contained beryllium materials: (1) Laboratories 4A and 4B; and (2) Laboratory 1K. Description of beryllium activities: (1) A September 1960 report noted a laboratory study to determine what materials will pass into solution

  18. United States Government Department of Energy Memorandum DATE:

    Energy Savers [EERE]

    *- - ~Lull-- " --- .lUI -4 ru a rlyA IgjUU Z JEf 1325.8 (6-89) EFG (07.90) United States Government Department of Energy Memorandum DATE: SEP 2 2 2003 REPLY TO: IG-34 (A03TG049) Audit Report No.: OAS-L-03-21 sueJEcT: Evaluation of "The Federal Energy Regulatory Commission's Cyber Security Program-2003" TO: Chairman, Federal Energy Regulatory Commission The purpose of this report is to inform you of the results of our evaluation of the Federal Energy Regulatory Commission's

  19. ANALYSIS OF OUT OF DATE MCU MODIFIER LOCATED IN SRNL

    SciTech Connect (OSTI)

    Crawford, C.

    2014-10-22

    SRNL recently completed density measurements and chemical analyses on modifier samples stored in drums within SRNL. The modifier samples date back to 2008 and are in various quantities up to 40 gallons. Vendor information on the original samples indicates a shelf life of 5 years. There is interest in determining if samples that have been stored for more than the 5 year shelf life are still acceptable for use. The Modular Caustic Side Solvent Extraction Unit (MCU) Solvent component Cs-7SB [(2,2,3,3- tetraflouropropoxy)-3-(4-sec-butylphenoxy)-2-propanol, CAS #308362-88-1] is used as a diluent modifier to increase extractant solubility and provide physical characteristics necessary for diluent trimming.

  20. Summative Mass Closure: Laboratory Analytical Procedure (LAP) Review and Integration: Feedstocks; Issue Date: April 2010; Revision Date: July 2011 (Version 07-08-2011)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Summative Mass Closure Laboratory Analytical Procedure (LAP) Review and Integration Issue Date: April 2010 Revision Date: July 2011 (Version 07-08-2011) J. Sluiter and A. Sluiter Technical Report NREL/TP-510-48087 Revised July 2011 Technical Report Summative Mass Closure NREL/TP-510-48087 Revised July 2011 Laboratory Analytical Procedure (LAP) Review and Integration Issue Date: April 2010 Revision Date: July 2011 (Version 07-08-2011) J. Sluiter and A. Sluiter Prepared under Task No. BB072230

  1. Public Law 109-364, dated OCT 17, 2006 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Public Law 109-364, dated OCT 17, 2006, Subtitle D-United States Defense Industrial Base Provisions Public Law 109-364, dated OCT 17, 2006 More Documents & Publications Special...

  2. Developing 226Ra and 227Ac age-dating techniques for nuclear...

    Office of Scientific and Technical Information (OSTI)

    Accepted Manuscript: Developing 226Ra and 227Ac age-dating techniques for nuclear ... Title: Developing 226Ra and 227Ac age-dating techniques for nuclear forensics to gain ...

  3. K-Ar Dates Of Hydrothermal Clays From Core Hole Vc-2B, Valles...

    Open Energy Info (EERE)

    (765 m) gives an age of 6.74 Ma. Two dates on illite from sandstones in Permian red beds (1008 and 1187 m) are 4.33 and 4.07 Ma, respectively. Surprisingly, three dates on...

  4. Property:Geothermal/DoeFundingLevelToDate | Open Energy Information

    Open Energy Info (EERE)

    Property Edit with form History Property:GeothermalDoeFundingLevelToDate Jump to: navigation, search Property Name GeothermalDoeFundingLevelToDate Property Type Number...

  5. Home Energy Score: Analysis & Improvements to Date | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Score: Analysis & Improvements to Date Home Energy Score: Analysis & Improvements to Date Home Energy Score: Analysis & Improvements to Date, a presentation from the U.S. Department of Energy, by Joan Glickman Senior Advisor/Program Manager, Home Energy Score, July 24, 2012. PDF icon pilot_analysis_webinar7-24-12.pdf More Documents & Publications Home Energy Score: Analysis & Improvements to Date Home Energy Score Program HES Program Update and Scoring Tool v2014 Release

  6. DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding the compliance date for the dehumidifier test procedure.

  7. Hazard Communication Training- Upcoming Implementation Date for New Hazard Communication Standard

    Broader source: Energy.gov [DOE]

    Hazard Communication Training - Upcoming Implementation Date for New Hazard Communication Standard - OSHA's 29 CFR 1910.1200, Hazard Communication Standard.

  8. U.S. Department of Energy TP/TI Date PROPERTY

    Energy Savers [EERE]

    01-95) U.S. Department of Energy TP/TI Date PROPERTY TRANSFER or TURN-IN From LOCATION Property Tag No. Stock No. Description of Articles Serial No. Qty. Unit Price Age and Condition ORIGINAL; COPY 1 - TRANSFEREE; COPY 2 - PROPERTY ACCOUNTABLE OFFICER; COPY 3 - TRANSFEROR Date recorded: Signature (Transferor) ACCOUNTABLE PROPERTY REPRESENTATIVE (PROPERTY SECTION) Date shipped Date received Signature (Transferee) ACCOUNTABLE PROPERTY REPRESENTATIVE TRANSFER APPROVED: PROPERTY ACCOUNTABLE OFFICER

  9. Detection and Analysis of Threats to the Energy Sector: DATES

    SciTech Connect (OSTI)

    Alfonso Valdes

    2010-03-31

    This report summarizes Detection and Analysis of Threats to the Energy Sector (DATES), a project sponsored by the United States Department of Energy and performed by a team led by SRI International, with collaboration from Sandia National Laboratories, ArcSight, Inc., and Invensys Process Systems. DATES sought to advance the state of the practice in intrusion detection and situational awareness with respect to cyber attacks in energy systems. This was achieved through adaptation of detection algorithms for process systems as well as development of novel anomaly detection techniques suited for such systems into a detection suite. These detection components, together with third-party commercial security systems, were interfaced with the commercial Security Information Event Management (SIEM) solution from ArcSight. The efficacy of the integrated solution was demonstrated on two testbeds, one based on a Distributed Control System (DCS) from Invensys, and the other based on the Virtual Control System Environment (VCSE) from Sandia. These achievements advance the DOE Cybersecurity Roadmap [DOE2006] goals in the area of security monitoring. The project ran from October 2007 until March 2010, with the final six months focused on experimentation. In the validation phase, team members from SRI and Sandia coupled the two test environments and carried out a number of distributed and cross-site attacks against various points in one or both testbeds. Alert messages from the distributed, heterogeneous detection components were correlated using the ArcSight SIEM platform, providing within-site and cross-site views of the attacks. In particular, the team demonstrated detection and visualization of network zone traversal and denial-of-service attacks. These capabilities were presented to the DistribuTech Conference and Exhibition in March 2010. The project was hampered by interruption of funding due to continuing resolution issues and agreement on cost share for four months in 2008. This resulted in delays in finalizing agreements with commercial partners, and in particular the Invensys testbed was not installed until December 2008 (as opposed to the March 2008 plan). The project resulted in a number of conference presentations and publications, and was well received when presented at industry forums. In spite of some interest on the part of the utility sector, we were unfortunately not able to engage a utility for a full-scale pilot deployment.

  10. Home Energy Score: Analysis & Improvements to Date | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Score: Analysis & Improvements to Date Home Energy Score: Analysis & Improvements to Date PDF icon pilot_analysis_webinar7-24-12.pdf More Documents & Publications Home Energy Score: Analysis & Improvements to Date Home Energy Score Program HES Program Update and Scoring Tool v2014 Release

  11. NVN-083933 | Open Energy Information

    Open Energy Info (EERE)

    Managing Field Office BLM Stillwater Field Office Surface Manager BLM Lessee 1 Dusty Miller LLC Lessee 2 none provided Effective Date 20070901 Expire Date 20170831 Held By...

  12. BPA-2012-01172-FOIA Correspondence

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    awardee, award value, award date, expiration date, contract number, contract type, status data. In a phone conversation today you defined readily available as information...

  13. BPA-2012-01172-FOIA Response

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    awardee, award value, award date, expiration date, contract number, contract type, status data. In a phone conversation today you defined readily available as information...

  14. Texas Nuclear Profile - Comanche Peak

    U.S. Energy Information Administration (EIA) Indexed Site

    Comanche Peak" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" ...

  15. Texas Nuclear Profile - South Texas Project

    U.S. Energy Information Administration (EIA) Indexed Site

    South Texas Project" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" ...

  16. Tennessee Nuclear Profile - Sequoyah

    U.S. Energy Information Administration (EIA) Indexed Site

    Sequoyah" "Unit","Summer Capacity (MW)","Net Generation (Thousand MWh)","Summer Capacity Factor (Percent)","Type","Commercial Operation Date","License Expiration Date" ...

  17. THIRD SUPPLEMENT TO LOAN GUARANTEE SOLICITATION ANNOUNCEMENT

    Broader source: Energy.gov (indexed) [DOE]

    ADVANCED FOSSIL ENERGY PROJECTS Solicitation Number: DE-SOL-0006303 OMB Control Number: 1910-5134; OMB Expiration Date 11302016 Announcement Type: Supplemental Supplement Date:...

  18. NVN-010922 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 BRADY POWER PARTNERS Lessee 2 none provided Effective Date 12181974 Expire Date Held By...

  19. NVN-040353 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 BRADY POWER PARTNERS Lessee 2 none provided Effective Date 411986 Expire Date Held By...

  20. NVN-040355 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 BRADY POWER PARTNERS Lessee 2 none provided Effective Date 711986 Expire Date Held By...

  1. NVN-065561 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 BRADY POWER PARTNERS Lessee 2 none provided Effective Date 7312013 Expire Date Held By...

  2. NVN-065558 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 BRADY POWER PARTNERS Lessee 2 none provided Effective Date 911998 Expire Date Held By...

  3. UTU-086781 | Open Energy Information

    Open Energy Info (EERE)

    Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 STANDARD STEAM TRUST LLC Lessee 2 none provided Effective Date 1312019 Expire Date Held By Production...

  4. UTU-086778 | Open Energy Information

    Open Energy Info (EERE)

    Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 STANDARD STEAM TRUST LLC Lessee 2 none provided Effective Date 1312019 Expire Date Held By Production...

  5. NVN-077481 | Open Energy Information

    Open Energy Info (EERE)

    Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 WILMINGTON TRUST CO TRUSTEE Lessee 2 none provided Effective Date 812005 Expire Date Held By...

  6. NVN-083967 | Open Energy Information

    Open Energy Info (EERE)

    Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 WILMINGTON TRUST CO TRUSTEE Lessee 2 none provided Effective Date 8142007 Expire Date Held By...

  7. UTU-086779 | Open Energy Information

    Open Energy Info (EERE)

    Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 STANDARD STEAM TRUST LLC Lessee 2 none provided Effective Date 12192008 Expire Date Held By Production...

  8. UTU-086780 | Open Energy Information

    Open Energy Info (EERE)

    Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 STANDARD STEAM TRUST LLC Lessee 2 none provided Effective Date 192009 Expire Date Held By Production...

  9. NVN-076014 | Open Energy Information

    Open Energy Info (EERE)

    Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 MACKIE STUART J Lessee 2 none provided Effective Date 912006 Expire Date Held By Production (HBP)...

  10. Application for Federal Assistance SF-424

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Number: 4040-0004 Expiration Date: 8312016 * 1. Type of Submission: * 2. Type of Application: * 3. Date Received: 4. Applicant Identifier: 5a. Federal Entity Identifier: 5b. ...

  11. UTU-029557 | Open Energy Information

    Open Energy Info (EERE)

    Date 511975 Expire Date Held By Production (HBP) HELD BY PROD-Actual HBP Date 5151984 RoyaltyRate Most Recent Action EFFECTIVE DATE Most Recent Action Date 511975 Location...

  12. CEA … External Power Supplies, CCE Overview and Update presentation, dated

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    June 28, 2011. | Department of Energy CEA … External Power Supplies, CCE Overview and Update presentation, dated June 28, 2011. CEA … External Power Supplies, CCE Overview and Update presentation, dated June 28, 2011. This document is the U.S. Department of Energys presentation titled CEA … External Power Supplies, CCE Overview and UpdateŽ, presentation date 6/28/2011. PDF icon cea_eps_presentation.pdf More Documents & Publications AHAM - CCE Overview and Update, dated 06/07/2011

  13. Appliance Standards Program Schedule- CCE Overview and Update, dated October 26, 2011

    Broader source: Energy.gov [DOE]

    This document is Appliance Standards Program Schedule & CCE Overview and Update presentation, dated 10/26/2011, presented to Energy-Efficiency Advocacy Groups

  14. Review Dates (updated May 2016) | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Review Dates (updated May 2016) Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated May 2016) Project Construction Photos Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us SC Projects Review Dates (updated May 2016) Print Text Size: A A A FeedbackShare Page

  15. Docket_N._EO-05-01signedby_Secretary_Bodman-_dated_92806.PDF | Department

    Energy Savers [EERE]

    of Energy Docket_N._EO-05-01signedby_Secretary_Bodman-_dated_92806.PDF Docket_N._EO-05-01signedby_Secretary_Bodman-_dated_92806.PDF PDF icon Docket_N._EO-05-01signedby_Secretary_Bodman-_dated_92806.PDF More Documents & Publications Department of Energy Order No. 202-07-1 Senator Dingell Letter to Secretary Bodman Support for City of Alexandria's Comments on the District of Columbia Public Service Commission, Docket No. EO-05-01

  16. NEMA Lighting, CCE Overview and Update presentation, dated 05/25/2011. |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Lighting, CCE Overview and Update presentation, dated 05/25/2011. NEMA Lighting, CCE Overview and Update presentation, dated 05/25/2011. This document is the U.S. Department of Energys presentation titled NEMA Lighting, CCE Overview and UpdateŽ, date - May 25, 2011. PDF icon nema_lighting_presentaion.pdf More Documents & Publications Energy Conservation Program for Consumer Products and Commercial and Industrial Equipment-- AHRI Annual Meeting CCE Overview and

  17. Property:Incentive/ExpireDt | Open Energy Information

    Open Energy Info (EERE)

    Massachusetts Municipal Commercial Industrial Incentive Program (Massachusetts) Methane Gas Conversion Property Tax Exemption (Iowa) Michigan - Residential Energy-Efficient...

  18. Property:Incentive/ExpireDtString | Open Energy Information

    Open Energy Info (EERE)

    Appliance Rebate Program (Alabama) + 2010-05-09 + Alameda Municipal Power - Solar Photovoltaics Rebate Program (California) + 2017-12-31 + Alcohol Fuels Exemption (Hawaii)...

  19. STATEMENT AND ACKNOWLEDGMENT Expires:e r/o2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    collection of information is estimated to average 30 minutes per response, Including the time for reviewing Instructions, searching existing data sources, gathering and...

  20. Form Reclearance Approval Expires: XX/XX/XXXX

    U.S. Energy Information Administration (EIA) Indexed Site

    collection of information unless the form displays a valid OMB number. U.S. Department of Energy U.S. Energy Information Administration Washington, DC 20585 Form EIA-858 Uranium...

  1. Geothermal Resources of New Mexico - A Survey of Work to Date...

    Open Energy Info (EERE)

    library Report: Geothermal Resources of New Mexico - A Survey of Work to Date Authors W.J. Stone and N.H. Mizell Published New Mexico Bureau of Mines & Mineral Resources, 1977...

  2. Save the Date! Earth Day’s 45th anniversary is on April 22, 2015

    Broader source: Energy.gov [DOE]

    Save the Date! Earth Day’s 45th anniversary is on April 22, 2015. The celebration will showcase interactive, eco-friendly exhibits and activities to raise awareness of environmental issues and encourage sustainability.

  3. Alaska - 3 AAC 48.280 Notice and Effective Date | Open Energy...

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Alaska - 3 AAC 48.280 Notice and Effective DateLegal Abstract This section outlines the notice...

  4. Microsoft Word - 2016 PV Systems Symposium - Save the Date v6.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sandia/EPRI PV Symposium - Save the Date! Save the Date and Call for Abstracts Sandia-EPRI 2016 PV Systems Symposium May 9-11 th at the Biltmore Hotel in Santa Clara, CA Sandia National Laboratories (SNL) and the Electric Power Research Institute (EPRI) are delighted to host this symposium on the technical challenges and opportunities related to solar photovoltaic (PV) systems and technologies. Core areas of focus will include PV performance modeling, distribution hosting capacity and screening

  5. I HEHORANDIJH I TO{ FILE DATE SUti.lECTa I O&R(S)

    Office of Legacy Management (LM)

    HEHORANDIJH I TO{ FILE DATE SUti.lECTa I O&R(S) -------- lyaa * ------------------------ currwlt * ~e.Gd. ------------------------ Owner contacted Ja Yes 0 no; if ym, date contact=d--~~~?~~-2--- :TY+E OF OPERATION --------- - ---- Research & Development 0 Facility Type Production scale testing Pi lot Scale Bench Scale Process Theoretical Studies *i Sample & &balysis a Hanuf ??cturing a University 0 Research Organization 0 Sov~rnment Sponsored Facjlity a Other

  6. Interim Transmittal Letter dated July 27 2005 | U.S. DOE Office of Science

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (SC) Interim Transmittal Letter dated July 27 2005 High Energy Physics Advisory Panel (HEPAP) HEPAP Home Meetings 2016 HEPAP Membership Charges/Reports Charter .pdf file (44KB) HEP Committees of Visitors Federal Advisory Committees HEP Home Charges/Reports Interim Transmittal Letter dated July 27 2005 Print Text Size: A A A FeedbackShare Page July 27, 2005 Harold T. Shapiro, Chair Sally Dawson, Vice Chair Elementary Particle Physics 2010 Committee The National Academies 500 Fifth Street, NW

  7. Memorandum from Daniel B. Poneman dated August 27, 2010, Strategic Business

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Initiatives | Department of Energy Daniel B. Poneman dated August 27, 2010, Strategic Business Initiatives Memorandum from Daniel B. Poneman dated August 27, 2010, Strategic Business Initiatives PDF icon Dep Sec Memo 082710.pdf More Documents & Publications Policy Flash 2015-10 Improving Capital Assets Project Documentation Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012)

  8. Memorandum from Paul Bosco dated May, 20, 2012, Utlization of the General

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Administration's Federal Strategic Sourcing Initiative Blanket Purchase Agreements | Department of Energy Paul Bosco dated May, 20, 2012, Utlization of the General Services Administration's Federal Strategic Sourcing Initiative Blanket Purchase Agreements Memorandum from Paul Bosco dated May, 20, 2012, Utlization of the General Services Administration's Federal Strategic Sourcing Initiative Blanket Purchase Agreements PDF icon Bosco Memo May 29 2012.pdf More Documents &

  9. DATE: TO:

    Broader source: Energy.gov (indexed) [DOE]

    and Assistance Management SUBJECT: Federal Procurement Data System Coding (FPDS) for Hurricane Gustav SUMMARY: An emergency declaration was made in preparation for Hurricane...

  10. DATE: PAGE:

    Broader source: Energy.gov (indexed) [DOE]

    PAGE: of NEPA COMPLIANCE OFFICER: 2015 Annual NEPA Planning Summary TYPE: STATUS: COST: NOIEAD: DRAFT: FINAL: DOCUMENT NUMBER & TITLE DESCRIPTION COMMENT TYPE: STATUS: COST:...

  11. Date: March

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 9, 2012 To: U. S. Department of Energy Richland Operations Office Office of Freedom of Information Act Post Office Box 550 Richland,Washington, 99352 From: Robert G....

  12. DATE: TO:

    Energy Savers [EERE]

    flashes.htrn . ( Questions relating to the AL may be directed to Kevin M, Smith a t (202) 287-1 6 14, or kevin.m.smith@h.doe.ov. uNg Michael P. Fischetti, Director...

  13. MEMORANDUM DATE

    Office of Legacy Management (LM)

    E FINCIL PRODUCT W4STE & RESIDUE . AEC,' MED INVOLVEMENT CIT 5 I TE ---...---... Control w Health Physics Protection 0 CIECMED managed operations (-J Little or None ...

  14. MEMORANDUfl DATE

    Office of Legacy Management (LM)

    AT SITE ---I-,- ---... ; Control 0 AEWMED mirnagcd OperdtiOns Hmalth Physics Protection 0 AECt-fED responsible for 0 Little or None accountability s@ECMED ...

  15. DATE: PAGE:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PAGE: of NEPA COMPLIANCE OFFICER: 2016 Annual NEPA Planning Summary TYPE: STATUS: COST: NOIEAD: DRAFT: FINAL: DOCUMENT NUMBER & TITLE DESCRIPTION COMMENT TYPE: STATUS: COST: ...

  16. Effective Date:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    99-2194 Waste Isolation Pilot Plant Environmental Monitoring Plan United States Department of Energy Waste Isolation Pilot Plant Revision 9 September 2015 This document supersedes DOE/WIPP-99-2194, Rev. 8 ISSUED Waste Isolation Pilot Plant Environmental Monitoring Plan DOE/WIPP-99-2194, Rev. 9 This document has been submitted as required to: U.S. Department of Energy Office of Scientific and Technical Information PO Box 62 Oak Ridge, TN 37831 (865) 576-8401 Additional information about this

  17. Jefferson Lab Announces April 30 Date for Open House | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Announces April 30 Date for Open House These are photos from the May 2014 Jefferson Lab Open House. Visitors were able to see many of the unique research facilities and learn about the leading-edge projects underway at the lab, as well as participate in a variety of science education activities and catch the ever-popular Liquid Nitrogen Demonstration. Plans are underway for the next Open House, on April 30, 2016. Jefferson Lab Announces April 30 Date for Open House NEWPORT NEWS, Va., Feb. 17,

  18. Determination of Protein Content in Biomass: Laboratory Analytical Procedure (LAP); Issue Date 05/23/2008

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protein Content in Biomass Laboratory Analytical Procedure (LAP) Issue Date: 05/23/2008 B. Hames, C. Scarlata, and A. Sluiter Technical Report NREL/TP-510-42625 Revised May 2008 NREL is operated by Midwest Research Institute ● Battelle Contract No. DE-AC36-99-GO10337 Determination of Protein Content in Biomass Laboratory Analytical Procedure (LAP) Issue Date: 05/23/2008 B. Hames, C. Scarlata, and A. Sluiter Technical Report NREL/TP-510-42625 Revised May 2008 National Renewable Energy

  19. Preparation of Samples for Compositional Analysis: Laboratory Analytical Procedure (LAP); Issue Date 08/08/2008

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Preparation of Samples for Compositional Analysis Laboratory Analytical Procedure (LAP) Issue Date: 8/06/2008 B. Hames, R. Ruiz, C. Scarlata, A. Sluiter, J. Sluiter, and D. Templeton Technical Report NREL/TP-510-42620 Revised August 2008 NREL is operated by Midwest Research Institute ● Battelle Contract No. DE-AC36-99-GO10337 Preparation of Samples for Compositional Analysis Laboratory Analytical Procedure (LAP) Issue Date: 8/06/2008 B. Hames, R. Ruiz, C. Scarlata, A. Sluiter, J. Sluiter, and

  20. DOE's AMO Releases Workshop "Save the Date" and New RFI on Composite

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manufacturing | Department of Energy DOE's AMO Releases Workshop "Save the Date" and New RFI on Composite Manufacturing DOE's AMO Releases Workshop "Save the Date" and New RFI on Composite Manufacturing December 11, 2013 - 12:00am Addthis The U.S. Department of Energy's (DOE) Advanced Manufacturing Office (AMO) plans to host a workshop on January 13, 2014 in the Washington, D.C. area on Fiber Reinforced Polymer (FRP) Composite Manufacturing. Low cost, lightweight, high

  1. Save the Date: 2014 SunShot Grand Challenge Summit, May 19-22, Anaheim, CA

    Office of Environmental Management (EM)

    | Department of Energy Save the Date: 2014 SunShot Grand Challenge Summit, May 19-22, Anaheim, CA Save the Date: 2014 SunShot Grand Challenge Summit, May 19-22, Anaheim, CA January 9, 2014 - 10:02am Addthis The SunShot Initiative at the U.S. Department of Energy (DOE) will host the second 2014 SunShot Grand Challenge Summit and Peer Review from May 19-22 in Anaheim, California. Building on the success of the first Grand Challenge Summit in 2012, this conference will bring together more than

  2. MidAmerican Energy (Gas and Electric) - Residential EnergyAdvantage...

    Broader source: Energy.gov (indexed) [DOE]

    Utility Administrator MidAmerican Energy Website http:www.midamericanenergy.comeeiaresfinancing.aspx Expiration Date 12312012 State Iowa Program Type Loan Program...

  3. SUPPLEMENT III REGARDING APPLICATION SUBMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LOAN GUARANTEES FOR ADVANCED NUCLEAR ENERGY PROJECTS Solicitation Number: DE-SOL- DE-SOL-0007791 OMB Control Number: 1910-5134; OMB Expiration Date 11302016 Announcement ...

  4. Chicopee Electric Light Department - Residential Energy Efficiency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Name Utility Administrator EFI Municipal Rebates Website http:www.celd.comindex.php?pageenergy-star-appliance-rebates Expiration Date 12312015 State Massachusetts...

  5. Tennessee Nuclear Profile - Watts Bar Nuclear Plant

    U.S. Energy Information Administration (EIA) Indexed Site

    Watts Bar Nuclear Plant" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration ...

  6. SUPPLEMENT TO LOAN GUARANTEE SOLICITATION ANNOUNCEMENT FEDERAL...

    Broader source: Energy.gov (indexed) [DOE]

    ENERGY PROJECTS AND EFFICIENT ENERGY PROJECTS Solicitation Number: DE-SOL-0007154 OMB Control Number: 1910-5134; OMB Expiration Date 11302016 Announcement Type: Supplemental...

  7. SUPPLEMENT TO LOAN GUARANTEE SOLICITATION ANNOUNCEMENT FEDERAL...

    Energy Savers [EERE]

    FEDERAL LOAN GUARANTEES FOR ADVANCED NUCLEAR ENERGY PROJECTS Solicitation Number: DE-SOL- DE-SOL-0007791 OMB Control Number: 1910-5134; OMB Expiration Date 11302016...

  8. Zero-Emission Facilities Production Tax Credit | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Electric Solar Photovoltaics Wind (All) Hydroelectric Wind (Small) Program Info Sector Name State Administrator Oklahoma Tax Commission Expiration Date 12312020 State Oklahoma...

  9. Detroit Public Lighting Department - Commercial and Industrial...

    Broader source: Energy.gov (indexed) [DOE]

    PublicLightingEnergyWis... Expiration Date 11302012 State Michigan Program Type Rebate Program Rebate Amount Light Fixtures: 2-130 Lighting Controls: 0.10-65...

  10. AEP SWEPCO - Commercial and Industrial Renewable Energy and Energy...

    Broader source: Energy.gov (indexed) [DOE]

    Southwestern Electric Power Website http:www.swepcogridsmart.comarkansasbusinessLP.html Expiration Date 01012016 State Arkansas Program Type Rebate Program Rebate Amount Air...

  11. Microsoft Word - EmergencyExchangeTemplatenedrevision10-clean...

    Broader source: Energy.gov (indexed) [DOE]

    Officer an acceptable "Irrevocable Standby Letter of Credit" established in favor of the United States Department of Energy in the amount of with an expiration date...

  12. FIFTH SUPPLEMENT TO LOAN GUARANTEE SOLICITATION ANNOUNCEMENT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEDERAL LOAN GUARANTEES FOR ADVANCED FOSSIL ENERGY PROJECTS Solicitation Number: DE-SOL-0006303 OMB Control Number: 1910-5134; OMB Expiration Date 11302016 Announcement...

  13. FOURTH SUPPLEMENT TO LOAN GUARANTEE SOLICITATION ANNOUNCEMENT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RENEWABLE ENERGY PROJECTS AND EFFICIENT ENERGY PROJECTS Solicitation Number: DE-SOL-0007154 OMB Control Number: 1910-5134; OMB Expiration Date 11302016 Announcement Type:...

  14. Texas-New Mexico Power Company - SCORE/CitySmart, Commercial...

    Broader source: Energy.gov (indexed) [DOE]

    20% of program budget Program Info Sector Name Utility Administrator Texas-New Mexico Power Company Website http:www.tnmpefficiency.com Expiration Date 12312015 State...

  15. DOE F 540.4.cdr

    Energy Savers [EERE]

    of Energy WEATHERIZATION ASSISTANCE PROGRAM ANNUAL TRAINING, TECHNICAL ASSISTANCE, MONITORING , AND LEVERAGING REPORT OMB Expiration Date: State Program Year Grant Number ...

  16. Xcel Energy - Residential Energy Efficiency Rebate Program |...

    Broader source: Energy.gov (indexed) [DOE]

    ResidentialSolutionsRebates... Expiration Date 12312014 State New Mexico Program Type Rebate Program Rebate Amount Draft Check Kits and Power Check Meters:...

  17. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Philadelphia Gas Works- Commercial and Industrial Equipment Rebate Program NOTE: Promotional dates for the incentives expired on 08032014. Please check with PGW to see if the...

  18. 22648

    Energy Savers [EERE]

    SUBGRANTEE INFORMATION Grant #: ________________ Amendment: ________________ State: ________________ Program Year: ________________ Name: ______________________________________________ Address: ____________________________________________ ____________________________________________ ____________________________________________ DOE F 540.5 (08/05) OMB Control No. __________ Expiration Date: ___________ *Contact: _____________________________________________ *Phone:

  19. Documents for Foreign Nationals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    present the following documents when they register at the ALS User Services Office: Passport: Passport must show issue and expiration date, passport number, and photo. I-94...

  20. Table Definitions, Sources, and Explanatory Notes

    Gasoline and Diesel Fuel Update (EIA)

    contract specifying the earliest delivery date. Natural gas contracts expire three business days prior to the first calendar day of the delivery month. Thus, the delivery month...

  1. Small Business - Xcel Energy Customers | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Program Info Sector Name Utility Website http:www.xcelenergy.comEnergySolutionsBusinessSolutionsRebates&... Expiration Date 12312015 State Wisconsin Program Type...

  2. AZA-009178 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT NELSON B Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP Date...

  3. AZA-009177 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT NELSON B Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP Date...

  4. AZA-009185 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT NELSON B Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP Date...

  5. AZA-009184 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT NELSON B Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP Date...

  6. AZA-009183 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT NELSON B Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP Date...

  7. AZA-009179 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT NELSON B Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP Date...

  8. AZA-009180 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT NELSON B Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP Date...

  9. AZA-009181 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT NELSON B Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP Date...

  10. AZA-009182 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT NELSON B Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP Date...

  11. NVN-017283A | Open Energy Information

    Open Energy Info (EERE)

    OF LAND MGMT Lessee 1 TGP COYOTE CANYON LLC Lessee 2 none provided Effective Date 1111977 Expire Date Held By Production (HBP) HELD BY LOCATION IN A PRODUCING UNIT HBP Date 6...

  12. NVN-017282 | Open Energy Information

    Open Energy Info (EERE)

    OF LAND MGMT Lessee 1 TGP COYOTE CANYON LLC Lessee 2 none provided Effective Date 1111977 Expire Date Held By Production (HBP) HELD BY LOCATION IN A PRODUCING UNIT HBP Date 6...

  13. NVN-075228 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 GERLACH GEOTHERMAL LLC Lessee 2 none provided Effective Date 1112001 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  14. NVN-085712 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 ENEL GEOTHERMAL LLC Lessee 2 none provided Effective Date 852008 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  15. CACA-011667 | Open Energy Information

    Open Energy Info (EERE)

    Surface Manager INYO NF Lessee 1 MAMMOTH-PACIFIC LP Lessee 2 none provided Effective Date 311982 Expire Date Held By Production (HBP) HELD BY PROD-Actual HBP Date 12221990...

  16. NVN-060686 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORNI 32 LLC Lessee 2 none provided Effective Date 6302016 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  17. NVN-085716 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORMAT NEVADA INC Lessee 2 none provided Effective Date 912008 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  18. NVN-076823 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORMAT NEVADA INC Lessee 2 none provided Effective Date 912006 Expire Date Held By Production (HBP) HBP Date RoyaltyRate 10% - 5% - 5% Most...

  19. NVN-076676 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 REESE RIVER GEO POWER LLC Lessee 2 none provided Effective Date 1112003 Expire Date Held By Production (HBP) HBP Date RoyaltyRate 1.75% - 3.5% Most...

  20. NVN-076299 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 TGP NEW YORK CANYON LLC Lessee 2 none provided Effective Date 1112002 Expire Date Held By Production (HBP) HBP Date RoyaltyRate 1.75% - 3.5% Most...

  1. NVN-077482 | Open Energy Information

    Open Energy Info (EERE)

    OF LAND MGMT Lessee 1 WILMINGTON TRUST CO TRUSTEE Lessee 2 none provided Effective Date 812005 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  2. UTU-086773 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORNI 48 LLC Lessee 2 none provided Effective Date 1122009 Expire Date Held By Production (HBP) HBP Date RoyaltyRate 1.75% - 3.5% Most...

  3. NVN-079291 | Open Energy Information

    Open Energy Info (EERE)

    Manager TOIYABE NF Lessee 1 GRADIENT RESOURCES INC Lessee 2 none provided Effective Date 612006 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  4. NVN-085715 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORNI 43 LLC Lessee 2 none provided Effective Date 912008 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  5. NVN-074865 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORMAT NEVADA INC Lessee 2 none provided Effective Date 1012002 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  6. NVN-079666 | Open Energy Information

    Open Energy Info (EERE)

    Manager TOIYABE NF Lessee 1 GRADIENT RESOURCES INC Lessee 2 none provided Effective Date 712005 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  7. NVN-042707 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 USG NEVADA LLC Lessee 2 none provided Effective Date 111986 Expire Date Held By Production (HBP) HELD BY PROD-ALLOCATED HBP Date 711993...

  8. NVN-088428 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORNI 43 LLC Lessee 2 none provided Effective Date 5312020 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  9. NVN-060688 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 TGP COYOTE CANYON LLC Lessee 2 none provided Effective Date 711996 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  10. NVN-086893 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 TGP NEW YORK CANYON LLC Lessee 2 none provided Effective Date 912009 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  11. NVN-077483 | Open Energy Information

    Open Energy Info (EERE)

    Surface Manager BUREAU OF LAND MGMT Lessee 1 ORNI 15 Lessee 2 none provided Effective Date 812005 Expire Date Held By Production (HBP) HELD BY PROD-ALLOCATED HBP Date 882010...

  12. NVN-085819X | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF RECLAMATIO Lessee 1 ORNI 16 LLC Lessee 2 none provided Effective Date 5312014 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  13. NVN-083966 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORNI 39 LLC Lessee 2 none provided Effective Date 1012007 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  14. NVN-048022 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 SODA LAKE RESRC PRTNRSHP Lessee 2 none provided Effective Date 511988 Expire Date Held By Production (HBP) HELD BY PROD-ALLOCATED HBP Date 1227...

  15. NVN-083937 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORMAT NEVADA INC Lessee 2 none provided Effective Date 1012007 Expire Date Held By Production (HBP) HBP Date RoyaltyRate 1.75% - 3.5% Most...

  16. OROR-065720 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORNI 41 LLC Lessee 2 none provided Effective Date 12192008 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  17. NVN-088435 | Open Energy Information

    Open Energy Info (EERE)

    OF LAND MGMT Lessee 1 NEVADA GEOTHERMAL POWER CO Lessee 2 none provided Effective Date 612010 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  18. NVN-078688 | Open Energy Information

    Open Energy Info (EERE)

    Manager TOIYABE NF Lessee 1 REESE RIVER GEO POWER LLC Lessee 2 none provided Effective Date 1012004 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  19. NVN-083941 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORMAT NEVADA INC Lessee 2 none provided Effective Date 1012007 Expire Date Held By Production (HBP) HBP Date RoyaltyRate 1.75% - 3.5% Most...

  20. NVN-086905 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 MAGMA ENERGY US CORP Lessee 2 none provided Effective Date 912009 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  1. NVN-086892 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 TGP COYOTE CANYON LLC Lessee 2 none provided Effective Date 912009 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  2. NVN-089603 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORMAT NEVADA INC Lessee 2 none provided Effective Date 512011 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  3. NVN-083931 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORNI 47 LLC Lessee 2 none provided Effective Date 9302017 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  4. NVN-074868 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORMAT NEVADA INC Lessee 2 none provided Effective Date 1012002 Expire Date Held By Production (HBP) HBP Date RoyaltyRate 10% - 5% - 5% Most...

  5. NVN-011737 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 SODA LAKE RESRC PRTNRSHP Lessee 2 none provided Effective Date 1011975 Expire Date Held By Production (HBP) HELD BY PROD-ALLOCATED HBP Date 826...

  6. NVN-079665 | Open Energy Information

    Open Energy Info (EERE)

    Manager TOIYABE NF Lessee 1 GRADIENT RESOURCES INC Lessee 2 none provided Effective Date 712005 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  7. NVN-088430 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 VENTURE PROSPECTS LLC Lessee 2 none provided Effective Date 712010 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  8. NVN-053371 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 SODA LAKE RESRC PRTNRSHP Lessee 2 none provided Effective Date 1011975 Expire Date Held By Production (HBP) HELD BY PROD-ALLOCATED HBP Date 811990...

  9. NVN-083929 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORNI 47 LLC Lessee 2 none provided Effective Date 1012007 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  10. NVN-075233 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 USG NEVADA NORTH LLC Lessee 2 none provided Effective Date 10312016 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  11. OROR-065723 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORNI 40 LLC Lessee 2 none provided Effective Date 212009 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  12. UTU-086760 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORNI 48 LLC Lessee 2 none provided Effective Date 212009 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  13. NVN-076827 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORMAT NEVADA INC Lessee 2 none provided Effective Date 912006 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  14. OROR-065722 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORNI 41 LLC Lessee 2 none provided Effective Date 12192008 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  15. NVN-079307 | Open Energy Information

    Open Energy Info (EERE)

    Manager TOIYABE NF Lessee 1 GRADIENT RESOURCES INC Lessee 2 none provided Effective Date 712006 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  16. NVN-079106 | Open Energy Information

    Open Energy Info (EERE)

    Surface Manager TOIYABE NF Lessee 1 ORNI 16 LLC Lessee 2 none provided Effective Date 912006 Expire Date Held By Production (HBP) HBP Date RoyaltyRate 10% - 5% - 5% Most...

  17. NVN-076301 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 TGP NEW YORK CANYON LLC Lessee 2 none provided Effective Date 10312012 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  18. NVN-077647 | Open Energy Information

    Open Energy Info (EERE)

    Manager TOIYABE NF Lessee 1 GRADIENT RESOURCES INC Lessee 2 none provided Effective Date 612006 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  19. NVN-086897 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORNI 43 LLC Lessee 2 none provided Effective Date 912009 Expire Date Held By Production (HBP) HBP Date RoyaltyRate 1.75% - 3.5% Most...

  20. NVN-079662 | Open Energy Information

    Open Energy Info (EERE)

    Manager TOIYABE NF Lessee 1 GRADIENT RESOURCES INC Lessee 2 none provided Effective Date 6302015 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  1. NVN-083934 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORMAT NEVADA INC Lessee 2 none provided Effective Date 1012007 Expire Date Held By Production (HBP) HBP Date RoyaltyRate 1.75% - 3.5% Most...

  2. NVN-074881 | Open Energy Information

    Open Energy Info (EERE)

    Surface Manager BUREAU OF LAND MGMT Lessee 1 ORNI 15 Lessee 2 none provided Effective Date 1012002 Expire Date Held By Production (HBP) HELD BY PROD-Actual HBP Date 112009...

  3. NVN-085723 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 MAGMA ENERGY US CORP Lessee 2 none provided Effective Date 912008 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  4. NVN-053372 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 SODA LAKE RESRC PRTNRSHP Lessee 2 none provided Effective Date 1011975 Expire Date Held By Production (HBP) HELD BY PROD-ALLOCATED HBP Date 811991...

  5. NVN-074249 | Open Energy Information

    Open Energy Info (EERE)

    Manager TOIYABE NF Lessee 1 GRADIENT RESOURCES INC Lessee 2 none provided Effective Date 912007 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  6. NVN-089605 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 TGP COYOTE CANYON LLC Lessee 2 none provided Effective Date 512011 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  7. NVN-083936 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORMAT NEVADA INC Lessee 2 none provided Effective Date 1012007 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  8. NVN-079663 | Open Energy Information

    Open Energy Info (EERE)

    Manager TOIYABE NF Lessee 1 GRADIENT RESOURCES INC Lessee 2 none provided Effective Date 712005 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  9. NVN-074883 | Open Energy Information

    Open Energy Info (EERE)

    Surface Manager BUREAU OF LAND MGMT Lessee 1 ORNI 15 Lessee 2 none provided Effective Date 1012002 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  10. NVN-090069 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF RECLAMATIO Lessee 1 GRADIENT RESOURCES INC Lessee 2 none provided Effective Date 1112008 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  11. NVN-083939 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORMAT NEVADA INC Lessee 2 none provided Effective Date 1012007 Expire Date Held By Production (HBP) HBP Date RoyaltyRate 1.75% - 3.5% Most...

  12. CACA-011672 | Open Energy Information

    Open Energy Info (EERE)

    provided Surface Manager INYO NF Lessee 1 ORNI 10 LLC Lessee 2 none provided Effective Date 111982 Expire Date Held By Production (HBP) HELD BY PROD-Actual HBP Date 12311998...

  13. OROR-065728 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORNI 41 LLC Lessee 2 none provided Effective Date 1312019 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  14. NVN-078687 | Open Energy Information

    Open Energy Info (EERE)

    Manager TOIYABE NF Lessee 1 REESE RIVER GEO POWER LLC Lessee 2 none provided Effective Date 1012004 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  15. NVN-085725 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 MAGMA ENERGY US CORP Lessee 2 none provided Effective Date 912008 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  16. NVN-085724 | Open Energy Information

    Open Energy Info (EERE)

    BUREAU OF LAND MGMT Lessee 1 MAGMA ENERGY US CORP Lessee 2 none provided Effective Date 912008 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  17. NVN-079668 | Open Energy Information

    Open Energy Info (EERE)

    Manager TOIYABE NF Lessee 1 GRADIENT RESOURCES INC Lessee 2 none provided Effective Date 712005 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  18. NVN-083935 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORMAT NEVADA INC Lessee 2 none provided Effective Date 1012007 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  19. UTU-086777 | Open Energy Information

    Open Energy Info (EERE)

    Manager BUREAU OF LAND MGMT Lessee 1 ORNI 48 LLC Lessee 2 none provided Effective Date 212009 Expire Date Held By Production (HBP) HBP Date RoyaltyRate Most Recent Action...

  20. CACA-014408 | Open Energy Information

    Open Energy Info (EERE)

    Surface Manager INYO NF Lessee 1 MAMMOTH-PACIFIC LP Lessee 2 none provided Effective Date 7191983 Expire Date Held By Production (HBP) HELD BY PROD-Actual HBP Date 782006...

  1. Fact Sheet: Detection and Analysis of Threats to the Energy Sector (DATES)

    Energy Savers [EERE]

    Detection and Analysis of Threats to the Energy Sector (DATES) A groundbreaking integrated capability in intrusion detection, security event management, and sector-wide threat analysis Detecting cyber attacks against digital control systems quickly and accurately is essential to energy sector security. Current intrusion detection systems (IDS) continuously scan control system communication paths and alert operators of suspicious network traffc. But existing IDS, often not tailored to the control

  2. COLLOQUIUM - PLEASE NOTE SPECIAL DATE/TIME: The Magnetospheric MultiScale

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Investigation of Magnetic Reconnection | Princeton Plasma Physics Lab February 21, 2013, 10:30am to 12:00pm Colloquia MBG Auditorium COLLOQUIUM - PLEASE NOTE SPECIAL DATE/TIME: The Magnetospheric MultiScale Mission Investigation of Magnetic Reconnection Professor Roy Torbert University of New Hampshire Presentation: File TC21FEB2013_RBTorbert_COMPRESSED.pptx In late fall 2014, NASA will launch the Magnetospheric Multiscale (MMS) mission to study the kinetic physics of magnetic

  3. Microsoft Word - 2014 BUDGET WORKSHOP - SAVE THE DATE Final.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SAVE THE DATE Thursday, March 15, 2012 2014 Hanford Budget and Cleanup Priorities Public Meeting The U.S. Department of Energy (DOE) Richland Operations Office, DOE Office of River Protection, U.S. Environmental Protection Agency (EPA) and the Washington State Department of Ecology (Ecology) would like to invite you to participate in a public meeting on Hanford cleanup priorities. When: Thursday, March 15, 2012 Where: Richland Public Library - Gallery Room 955 Northgate Drive Richland, WA 99352

  4. Microsoft Word - Incoming FOI from Grando dated July 23 2015.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Request Detail Page 1 of 2 Freedom Of Information Act Electronic FOIA Request Detail Request Number: 20150723101304808 Name: Carl Grando Organization: Mr. Address: Country: United States Phone Number: Fax Number: n/a E-mail: Reasonably Describe Records: Description: A copy of the original Award #DE-FG06-94RL12917, to TRIDEC and the modifications to date excluding mod #39 which I already have a copy of. Optional Information: Describe Yourself: An individual seeking information for personal use

  5. Memorandum DATE: April 19, 2004 Audit Report Number: OAS-L-04-14

    Energy Savers [EERE]

    SDOW F 1325 8 TF, 07-,O C) SUnited States Government -Department of Jaw y Memorandum DATE: April 19, 2004 Audit Report Number: OAS-L-04-14 REPLY TO ATTN OF: IG-30 SUBJECT: Review of Selected Issues Pertaining to Vapor Inhalation Allegations at the Hanford Site TO: Assistant Secretary for Environmental Management INTRODUCTION AND OBJECTIVE In May 2003, the Office of Inspector General (OIG) initiated a Department-wide audit addressing whether the Department's Computerized Accident/Incident

  6. Memorandum DATE: September 28, 2007 Audit Report No.: OAS-L-07-26

    Energy Savers [EERE]

    Department of Energy Memorandum DATE: September 28, 2007 Audit Report No.: OAS-L-07-26 REPLY TO ATTN OF: IG-34 (A07TG029) SUBJECT: Report on "Department's Implementation of the Strategic Integrated Procurement Enterprise System - Transition Planning, Interfaces, and Testing" TO: Chief Financial Officer, CF-1 INTRODUCTION AND OBJECTIVE The Strategic Integrated Procurement Enterprise System (STRIPES) initiative is an important component of the Department of Energy's (Department or DOE)

  7. PRESSURE RELIEF DEVICE DATA SHEET FORM PS-5 Pressure System Number: Date:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RELIEF DEVICE DATA SHEET FORM PS-5 Pressure System Number: Date: Pressure System Name: Pressure Vessel Number (if Applicable): Device installed directly on vessel?: __Yes __No Code: System Fluid: Code Year: Fluid State: Fluid Category: RELIEF DEVICE DATA Device Type ___Safety Relief Valve ____Rupture Disk ___Other (specify) Certification Type: ___ASME ___CE/PED ___Other (specify) Manufacturer Rated Flow Capacity: Part Number Converted Flow Capacity: Serial Number Set Pressure Inspection/Test

  8. Extension of DOE Directives on Security

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-12-31

    This Notice extends 15 Office of Security and Emergency Operation directives that have expired or will expire until December 31, 2001. This Notice will remain in effect until its expiration date or until new/revised directives are published. The following statement will be added to the summary of the extended directives-DOE N 251.40, dated 5/3/01, extends this directive until 12/31/01.

  9. Analog morphocorrelation: new technique with implications for high-resolution absolute age dating

    SciTech Connect (OSTI)

    Arnold, A.J.; Parker, W.C.; Berggren, W.A.

    1986-05-01

    The conventional approach to increased biostratigraphic resolution involves identifying additional datum planes defined by discrete events. Multivariate techniques used to refine a conventional taxonomic zonal scheme offer no improvement in precision; however, since the characters on which the zonal boundaries are based often show continuous stratigraphic variation, they offer an opportunity for continuous stratigraphic correlation based on the stage of evolution. Morphometric analysis was conducted on two lineages: (1) the Globorotalia cibaoensis-G. crassaformis linage, using a reference section from the early Pliocene of the Rio Grande rise, spanning approximately 2.6 m.y.; and (2) the G. conoidea-G.inflata lineage, using a reference section from the late Miocene to the Holocene from the southwest Pacific, spanning approximately 8 m.y. Stepwise multiple regression of morphologic variates generated an equation with an age-prediction precision (95% confidence) of +/- 122 k.y. in the G. crassaformis lineage and +/- 463 k.y. in the G conoidea lineage (accuracy depends on calibration of absolute dates in the reference section and our knowledge of sedimentation rates over the measured interval). Using single-equation analog morphocorrelation, any sample overlapped by the reference lineage can be correlated, which reduce the need for repeated sampling in a search for discrete events. The authors demonstrate that analysis of continuous morphologic variation can increase stratigraphic precision with a few carefully chosen variables, and that analog morpho-correlation can yield absolute dates, rather than relative dates with quantified error. Any disadvantages inherent in analog morphocorrelation are also found in conventional biostratigraphic techniques, but are usually unquantified and unrecognized.

  10. II United States Government DATE: REPLY TO Al-TN OF: SUBJECT:

    Office of Legacy Management (LM)

    r.@& * EFG (07-W,' . II United States Government DATE: REPLY TO Al-TN OF: SUBJECT: TO: EM-421 (W. A. W illiams, 903-8149) Authorization for Remedial Action at the Former Baker Brothers Inc. Site, Toledo, Ohio Manager, DOE Oak Ridge Field Office This is to notify you that the Former Baker Brothers, Inc. site in Toledo, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). This notification does not constitute a FUSRAP baseline change

  11. . UrZed States Government DePartment of Enerq DATE: REPLY TO

    Office of Legacy Management (LM)

    YVE r 1Lcla (8.8gJ EFG (07.90) (3f1 , q q - z . UrZed States Government DePartment of Enerq DATE: REPLY TO A?TN OF: SUBJECT: TO: =.--. AUG12 1991 EM-421 (J. Wagoner, 3-8147) Elimination of the Processes Research, Inc. Site The File I have reviewed the attached site summary and elimination recommendation for the Processes Research, Inc. Site in Cincinnati, Ohio. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the Processes Research,

  12. Exploration Of Activity Measurements And Equilibrium Checks For Sediment Dating Using Thick-Window Germanium Detectors

    SciTech Connect (OSTI)

    Warner, Jacob A.; Gladkis, Laura G.; Timmers, Heiko; Fitzsimmons, Kathryn E.; Reynolds, Eva M.

    2011-06-01

    Activity measurements on sediment samples for trapped-charge geological dating using gamma-ray spectroscopy are an important verification of the field-site dose rate determination. Furthermore gamma-ray spectroscopy can check if the natural decay series are in secular equilibrium which is a crucial assumption in such dating. Typically the activities of leading members of the Thorium and Uranium decay series are measured, which requires Germanium detectors with thin windows and good energy resolution in order to effectively detect the associated low energy gamma-rays. Such equipment is not always readily available. The potential of conventional Germanium detectors with thick entrance window has been explored towards routine gamma-ray spectroscopy of sediment samples using higher energy gamma-rays. Alternative isotopes, such as Ac-228 and Pb-212 for the Thorium series, and Pa-234m, Ra-226 and Bi-214 for the Uranium series, have been measured in order to determine the mass-specific activity for the respective series and possibly provide a check of secular equilibrium. In addition to measurements of the K-40 activity, with the alternative approach, the activities of both decay series can be accurately determined. The secular equilibrium condition may be tested for the Thorium series. Measurement accuracy for Pa-234m is, however, not sufficient to permit also a reliable check of equilibrium for the Uranium series.

  13. Concordant plutonium-241-americium-241 dating of environmental samples: results from forest fire ash

    SciTech Connect (OSTI)

    Goldstein, Steven J; Oldham, Warren J; Murrell, Michael T; Katzman, Danny

    2010-12-07

    We have measured the Pu, {sup 237}Np, {sup 241}Am, and {sup 151}Sm isotopic systematics for a set of forest fire ash samples from various locations in the western U.S. including Montana, Wyoming, Idaho, and New Mexico. The goal of this study is to develop a concordant {sup 241}Pu (t{sub 1/2} = 14.4 y)-{sup 241}Am dating method for environmental collections. Environmental samples often contain mixtures of components including global fallout. There are a number of approaches for subtracting the global fallout component for such samples. One approach is to use {sup 242}/{sup 239}Pu as a normalizing isotope ratio in a three-isotope plot, where this ratio for the nonglobal fallout component can be estimated or assumed to be small. This study investigates a new, complementary method of normalization using the long-lived fission product, {sup 151}Sm (t{sub 1/2} = 90 y). We find that forest fire ash concentrates actinides and fission products with {approx}1E10 atoms {sup 239}Pu/g and {approx}1E8 atoms {sup 151}Sm/g, allowing us to measure these nuclides by mass spectrometric (MIC-TIMS) and radiometric (liquid scintillation counting) methods. The forest fire ash samples are characterized by a western U.S. regional isotopic signature representing varying mixtures of global fallout with a local component from atmospheric testing of nuclear weapons at the Nevada Test Site (NTS). Our results also show that {sup 151}Sm is well correlated with the Pu nuclides in the forest fire ash, suggesting that these nuclides have similar geochemical behavior in the environment. Results of this correlation indicate that the {sup 151}Sm/{sup 239}Pu atom ratio for global fallout is {approx}0.164, in agreement with an independent estimate of 0.165 based on {sup 137}Cs fission yields for atmospheric weapons tests at the NTS. {sup 241}Pu-{sup 241}Am dating of the non-global fallout component in the forest fire ash samples yield ages in the late 1950's-early 1960's, consistent with a peak in NTS weapons testing at that time. The age results for this component are in agreement using both {sup 242}Pu and {sup 151}Sm normalizations, although the errors for the {sup 151}Sm correction are currently larger due to the greater uncertainty of their measurements. Additional efforts to develop a concordant {sup 241}Pu-{sup 241}Am dating method for environmental collections are underway with emphasis on soil cores.

  14. STATES GOVERI TO :H. J. He&man, Chief, Tonaw&da Sub-Of&e DATE...

    Office of Legacy Management (LM)

    STATES GOVERI TO :H. J. He&man, Chief, Tonaw&da Sub-Of&e DATE: ,i; .; .c. sgmbo1: PPS:W:mjf .. ,i. -'. i:.. :: (PPS447-53) I ..-:;..c. ' ..I-,-.. . i .,,. " :, ,, .T. ....

  15. WFR Totals by Fiscal Year of Employee Termination Date FY SRS Headcount

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WFR Totals by Fiscal Year of Employee Termination Date FY SRS Headcount 2014 11,068 0 2013 10,292 767 2012 12,757 273 2011 12,169 1,027 2010 13,325 26 2009 10,046 247 2008 9,903 0 2007 9,907 312 2006 10,404 638 2005 11,200 1,178 2004 12,552 110 2003 13,397 106 2002 13,492 486 2001 13,830 14 2000 13,665 208 1999 13,854 0 1998 14,193 0 1997 14,380 550 1996 15,922 323 1995 17,149 2,631 1994 21,039 56 1993 23,284 1,124 1992 24,591 1 1991 24,553 0 The work force at Savannah River Site has fluctuated

  16. IDI-035812 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 AGUA CALIENTE LLC C-O AMG N Lessee 2 none provided Effective Date 812007 Expire Date Held...

  17. IDI-036679 | Open Energy Information

    Open Energy Info (EERE)

    PriceAcre Managing Field Office none provided Surface Manager PRIVATE LANDS Lessee 1 AGUA CALIENTE LLC C-O AMG N Lessee 2 none provided Effective Date 312010 Expire Date Held...

  18. NVN-080159 | Open Energy Information

    Open Energy Info (EERE)

    PriceAcre Managing Field Office none provided Surface Manager TOIYABE NF Lessee 1 NGP BLUE MOUNTAIN I LLC Lessee 2 none provided Effective Date 7312016 Expire Date Held By...

  19. AZA-009176 | Open Energy Information

    Open Energy Info (EERE)

    Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 HUNT NELSON B Lessee 2 none provided Effective Date 811982 Expire Date Held By Production (HBP)...

  20. AZA-009192 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT OIL USA INC Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP...

  1. AZA-009191 | Open Energy Information

    Open Energy Info (EERE)

    PriceAcre Managing Field Office none provided Surface Manager COCONINO NF Lessee 1 HUNT OIL USA INC Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP...

  2. AZA-009187 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT OIL USA INC Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP...

  3. AZA-009189 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT OIL USA INC Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP...

  4. AZA-009188 | Open Energy Information

    Open Energy Info (EERE)

    Acre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT OIL USA INC Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP...

  5. AZA-009190 | Open Energy Information

    Open Energy Info (EERE)

    PriceAcre Managing Field Office none provided Surface Manager COCONINO NF Lessee 1 HUNT OIL USA INC Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP...

  6. AZA-009186 | Open Energy Information

    Open Energy Info (EERE)

    PriceAcre Managing Field Office none provided Surface Manager COCONINO NF Lessee 1 HUNT OIL USA INC Lessee 2 none provided Effective Date Expire Date Held By Production (HBP) HBP...

  7. NVN-008394 | Open Energy Information

    Open Energy Info (EERE)

    Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1 TERRA-GEN DIXIE VALLEY LLC Lessee 2 none provided Effective Date 911975 Expire Date Held By...

  8. 230Th-234U Age-Dating Uranium by Mass Spectrometry

    SciTech Connect (OSTI)

    Williams, R W; Gaffney, A M

    2012-04-18

    This is the standard operating procedure used by the Isotope Ratio Mass Spectrometry Group of the Chemical Sciences Division at LLNL for the preparation of a sample of uranium oxide or uranium metal for {sup 230}Th-{sup 234}U age-dating. The method described here includes the dissolution of a sample of uranium oxide or uranium metal, preparation of a secondary dilution, spiking of separate aliquots for uranium and thorium isotope dilution measurements, and purification of uranium and thorium aliquots for mass spectrometry. This SOP may be applied to uranium samples of unknown purity as in a nuclear forensic investigation, and also to well-characterized samples such as, for example, U{sub 3}O{sub 8} and U-metal certified reference materials. The sample of uranium is transferred to a quartz or PFA vial, concentrated nitric acid is added and the sample is heated on a hotplate at approximately 100 C for several hours until it dissolves. The sample solution is diluted with water to make the solution approximately 4 M HNO{sub 3} and hydrofluoric acid is added to make it 0.05 M HF. A secondary dilution of the primary uranium solution is prepared. Separate aliquots for uranium and thorium isotope dilution measurements are taken and spiked with {sup 233}U and {sup 229}Th, respectively. The spiked aliquot for uranium isotope dilution analysis is purified using EiChrom UTEVA resin. The spiked aliquot for thorium isotope dilution analysis is purified by, first, a 1.8 mL AG1x8 resin bed in 9 M HCl on which U adsorbs and Th passes through; second, adsorbing Th on a 1 mL AG1x8 resin bed in 8 M HNO{sub 3} and then eluting it with 9 M HCl followed by 0.1 M HCl + 0.005 M HF; and third, by passing the Th through a final 1.0 mL AG1x8 resin bed in 9 M HCl. The mass spectrometry is performed using the procedure 'Th and U Mass Spectrometry for {sup 230}Th-{sup 234}U Age Dating'.

  9. The Costs and Benefits of Compliance with Renewable Portfolio Standards: Reviewing Experience to Date

    SciTech Connect (OSTI)

    Heeter, Jenny; Barbose, Galen; Bird, Lori; Weaver, Samantha; Flores, Francisco; Kuskova-Burns, Ksenia; Wiser, Ryan

    2014-03-12

    More than half of U.S. states have renewable portfolio standards (RPS) in place and have collectively deployed approximately 46,000 MW of new renewable energy capacity through year-end 2012. Most of these policies have five or more years of implementation experience, enabling an assessment of their costs and benefits. Understanding RPS benefits and costs is essential for policymakers evaluating existing RPS policies, assessing the need for modifications, and considering new policies. A key aspect of this study is the comprehensive review of existing RPS cost and benefit estimates, in addition to an examination of the variety of methods used to calculate such estimates. Based on available data and estimates reported by utilities and regulators, this study summarizes RPS costs to date. The study considers how those costs may evolve going forward, given scheduled increases in RPS targets and cost containment mechanisms incorporated into existing policies. The report also summarizes RPS benefits estimates, based on published studies for individual states, and discusses key methodological considerations.

  10. ISDAC - NRC Convair-580 Flight Hours Date Flight From To Start

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - NRC Convair-580 Flight Hours Date Flight From To Start End hrs 03/21/08 F01-Test-01 Ottawa Ottawa 16:15Z 18:15Z 2.2 03/22/08 F02-Test-02 Ottawa Ottawa 12:45Z 15:50Z 3.3 03/28/08 F03-Transit-01 Ottawa, ON Kenora, ON 12:23Z 15:44Z 3.6 03/28/08 F04-Transit-02 Kenora, ON Calgary, AB 16:30Z 19:36Z 3.3 03/28/08 F05-Transit-03 Calgary, AB Comox, BC 20:24Z 22:17Z 2.1 03/29/08 F06-Transit-04 Comox, BC Whitehorse, YK 17:43Z 20:50Z 3.3 03/29/08 F07-Transit-05 Whitehorse, YK Fairbanks 21:51Z 23:42Z 2.1

  11. Energy Conservation Program for Consumer Products and Commercial and Industrial Equipment-- AHRI Annual Meeting CCE Overview and Update Presenation, dated April 13, 2011

    Broader source: Energy.gov [DOE]

    This document is the Energy Conservation Program for Consumer Products and Commercial and Industrial Equipment-- AHRI Annual Meeting CCE Overview and Update Presenation, dated April 13, 2011

  12. United States Government Department of Energy Memorandum DATE: November 20, 2003 Audit Report Number: OAS-L-04-05

    Energy Savers [EERE]

    DOb F 1325.8 (8-89) EFG (07-90) United States Government Department of Energy Memorandum DATE: November 20, 2003 Audit Report Number: OAS-L-04-05 REPLY TO: IG-30 (A03AL036) SUBJECT: Audit of Controls Over Expenditures Within the Office of Secure Transportation TO: Michael Kane, Associate Administrator for Management and Administration INTRODUCTION AND OBJECTIVE The National Nuclear Security Administration's (NNSA) Office of Secure Transportation (OST) supports the Department of Energy's

  13. United States Government. Department of Energy Memorandum DATE: September 28, 2007 Audit Report No.: OAS-L-07-25

    Energy Savers [EERE]

    Government. Department of Energy Memorandum DATE: September 28, 2007 Audit Report No.: OAS-L-07-25 REPLY TO ATTN OF: IG-34 (A07TG028) SUBJECT: Report on Audit of "Remote Access to the Department's Unclassified Information Systems" TO: Administrator, National Nuclear Security Administration, NA-1 Under Secretary for Science, SC-1 Acting Under Secretary of Energy, NE-1 Chief Information Officer, IM-1 INTRODUCTION AND OBJECTIVE To help accomplish its strategic goals and mission

  14. United States Goverment Department of Energy Memorandum DATE: December 11, 2007 Audit Report Number: OAS-L-08-03

    Energy Savers [EERE]

    (08-93) United States Goverment Department of Energy Memorandum DATE: December 11, 2007 Audit Report Number: OAS-L-08-03 REPLY TO ATTN OF: IG-34 (A07GT010) SUBJECT: Report on "The Department of Energy's Implementation of Revised OMB Circular No. A-123" TO: Chief Financial Officer, CF-1 INTRODUCTION AND OBJECTIVE The Office of Management and Budget's (OMB) revised Circular No. A-123 (A-123) requires Federal agencies to assess, document and test their internal controls over financial

  15. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... S. Department of Energy P.O. Box 2001 ?o. Box 2001 Oak Ridge TN 37831 Oak ... 01252007 CONFERENCE MANAGEMENT DOE O 130.1 09291995 BUDGET FORMULATION PROCESS Expiration date ...

  16. RAPID/Roadmap/19-NM-b | Open Energy Information

    Open Energy Info (EERE)

    a new permit and fee will be required for any drilling beyond the permit expiration date. Process Flowchart 19-NM-b - Permit to Drill a Well with No Consumptive Use of Water.pdf...

  17. Form EIA-457E (2001) -- Household Bottled Gas Usage

    U.S. Energy Information Administration (EIA) Indexed Site

    You are not required to respond to this form unless it displays a currently valid OMB control number. You will find the OMB approval number and expiration date at the top left-hand ...

  18. RESPONDENT INFORMATION

    U.S. Energy Information Administration (EIA) Indexed Site

    Version No: 2015.001 OMB No. 1905-0057 Expiration Date: 7312016 ANNUAL REPORT OF THE ORIGIN OF NATURAL GAS LIQUIDS PRODUCTION FORM EIA-64A REPORT YEAR 2015 2015 Use Area of ...

  19. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the expiration date of Land Use Agreement No 960067 until December 31, 2020. All other terms and conditions of Land Use Agreement No. 960067 and Amendments I. 2. 3. 4. 5. and 6...

  20. Renewable Electricity Production Tax Credit (PTC)

    Broader source: Energy.gov [DOE]

    Note: In December 2015, the Consolidated Appropriations Act, 2016 extended the expiration date for this tax credit to December 31, 2019, for wind facilities commencing construction, with a phase...

  1. Mr. Todd Sellmer Washington TRU Solutions LLC

    National Nuclear Security Administration (NNSA)

    ... Rev 3. Section 5.2.3. "Hydrogen Gas Generation Rate and Decay Heat Limits for ... certificate may be used until August 31. 2010 EXpiration date, August 31, 2014. ...

  2. South Carolina Nuclear Profile - Oconee

    U.S. Energy Information Administration (EIA) Indexed Site

    expiration date" 1,846,"7,434",100.3,"PWR","applicationvnd.ms-excel","applicationvnd.ms-excel" 2,846,"6,731",90.8,"PWR","applicationvnd.ms-excel","application...

  3. North Carolina Nuclear Profile - Brunswick

    U.S. Energy Information Administration (EIA) Indexed Site

    expiration date" 1,938,"6,808",82.9,"BWR","applicationvnd.ms-excel","applicationvnd.ms-excel" 2,920,"8,000",99.3,"BWR","applicationvnd.ms-excel","application...

  4. Research and Innovation in U.S. Wind Won't Die with Expiration of Federal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Research and Development Roadmap: Windows and Building Envelope Research and Development Roadmap: Windows and Building Envelope Cover of windows and envelope report, depicting a house, storefront, and multiple office windows. This Building Technologies Office (BTO) Research and Development (R&D) Roadmap identifies priority windows and building envelope R&D areas of interest. Cost and performance targets are identified for each key R&D area. The roadmap

  5. Research and Innovation in U.S. Wind Won't Die with Expiration...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... of materials and manufacturing, and how materials get put into wind turbine blades. ... the feasibility of putting very large, floating, vertical- axis wind turbines in the ...

  6. Get Your Federal Tax Credits for Energy Efficiency Before They Expire |

    Energy Savers [EERE]

    Filing Information Filing Information The Office of Hearings and Appeals (OHA) encourages electronic filing of submissions, by e-mail or by telefax. OHA's e-mail address for filing submissions is OHA.filings@hq.doe.gov; the OHA telefax number is (202) 287-1415. Note, however, that because of signature issues, we may ask you to file a signed original of a document. We will send an acknowledgment (by letter or e-mail) upon our receipt of all principal pleadings. If you choose to file by regular

  7. Encouraging PV Adoption in New Market-Rate ResidentialConstruction: A Critical Review of Program Experiences to Date

    SciTech Connect (OSTI)

    Barbose, Galen; Wiser, Ryan; Bolinger, Mark

    2006-04-24

    In this paper, we review experiences with programs to support the deployment of photovoltaics (PV) in new, market-rate homes, drawing upon interviews with program managers around the country, project data, and publicly-available documentation on program design, impacts, and experiences. We focus on state clean energy funds, which have been established in 14 U.S. states to build markets for clean energy resources, as well as a select number of other state or local organizations whose activities are particularly noteworthy. We describe the types of programs implemented and their impacts to date, and discuss key issues and lessons learned for initiatives aimed at growing the new home market for PV.

  8. MEMORANDUM TO: FILE DATE

    Office of Legacy Management (LM)

    ... of Ex-AX Owned cc wends: Comnissioner Larson Commissioner Doub Commissioner Kriegsman ... N.N. *Picatinny Arsenal Dover, N.J. i Action Taken Unit III decontaminated and ...

  9. Procurement Directors DATE: TO:

    Broader source: Energy.gov (indexed) [DOE]

    Sequence 211 cause of commercial purchase orders. Government procurement. DoD, GSA, and NASA published a RIN 9000-AK46 proposed rule in the Federal Register at March l5, 2007 71 FR...

  10. MEMORANDUM TO: FILE DATE-

    Office of Legacy Management (LM)

    n Refined Source Material q Residue a Natural Radioactive Materi+ from Non-Nuclear Act 0 Man-Made 12 Other--- Comment-l------- ---...

  11. General Nuclear Date

    Energy Science and Technology Software Center (OSTI)

    2010-10-27

    Provides python rountines to convert ENDF-6 formatted nuclear data (4) into the new GND structure. Includes sample published ENDF-6 formatted data as well as published ENSL (5) and HDF5 file.

  12. Media contact: Release date

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2010 media@wch-rcc.com Local veteran-owned small business gets ARRA funds to upgrade ERDF RICHLAND, Wash.-Washington Closure Hanford has awarded a subcontract worth nearly $7 million to ERLFowler, a local small business, to design and build an operations center and three maintenance facilities at Hanford's Environmental Restoration Disposal Facility. The new facilities are part of a $100 million expansion and upgrade of ERDF funded by the American Recovery and Reinvestment Act. The expansion

  13. Media contact: Release date

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12, 2010 media@wch-rcc.com River Corridor cleanup drivers reach 15 million miles RICHLAND, Wash.-The truck drivers working on the River Corridor Closure Project recently logged 15 million miles transporting waste for disposal at Hanford's Environmental Restoration Disposal Facility. That is the equivalent of more than 600 trips around the Earth. ERDF is the onsite disposal facility for cleanup wastes at the 586-square-mile Hanford Site in south-central Washington state. Most of the 9.3 million

  14. Media contact: Release date

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 24, 2010 media@wch-rcc.com Local business receives $3.8 million ARRA cleanup subcontract RICHLAND, Wash.-Washington Closure Hanford has awarded a subcontract worth $3.8 million to Ojeda Business Ventures of Richland. The subcontract is to cleanup 13 waste sites, with an option for cleanup of additional waste sites as needed, in Hanford's F Area. Funding for the work comes from the American Recovery and Reinvestment Act. The sites being cleaned up include a coal pit, underground piping and

  15. Media contact: Release date

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 7, 2010 media@wch-rcc.com Local company receives $3.7 million in Recovery Act funds to provide Hanford utilities RICHLAND, Wash.-Washington Closure Hanford has awarded a subcontract worth nearly $3.7 million to White Shield/Apollo, a small, disadvantaged joint venture between White Shield Inc. of Pasco and Apollo Inc. of Kennewick. The subcontract is to install water, electricity, roads, office trailers and waste container transfer areas at the 618-10 Burial Ground at Hanford. Funding for

  16. Media contact: Release date

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 10, 2010 media@wch-rcc.com Local business receives $30 million ARRA subcontract to expand landfill RICHLAND, Wash.-Washington Closure Hanford has awarded a subcontract worth up to $30 million to TradeWind Services, a service-disabled, veteran-owned small business based in Richland. The project, which will expand Hanford's Environmental Restoration Disposal Facility by 50 percent, is funded by the American Recovery and Reinvestment Act. ERDF is an engineered, low-level radioactive and

  17. DATE: TO: FROM:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    is included in this AL?" section under its "Approval" subsection. The revised language appears in italics. The revision grants authority to a Head of Contracting Activity...

  18. DATE: TO: FROM:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Guide Chapter 71.1 and the understanding of the Business Clearance process. ... procedures for expedited reviews of pre- negotiation memorandums for post award actions. ...

  19. DATE: TO: FROM:

    Energy Savers [EERE]

    TO: FROM: POLICY FLASH 2015-32 July 06, 2015 Procurement Directors/Contracting Officers ~~ Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Federal Acquisition Circular (F AC) 2005-83 SUMMARY: Attached for your information is a brief summary of Federal Acquisition Regulation (FAR) amendments, published in the July 2, 2015 Federal Register at 80 FR 38292. FAC 2005-83 issued 6 final rules and technical amendments. One of the final

  20. DATE: TO: FROM:

    Office of Environmental Management (EM)

    52 May 17,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Acquisition Letters Remaining In Effect SUMMARY: Acquisition Letter (AL) 2010-07 has been issued. It lists ALs currently in effect and the discontinued ALs along with the reason why the AL is no longer in effect. This flash may be viewed at http://mana~ement.energ;y.~ov/policy p;uidance/policy flashes.htm. Questions concerning this policy flash

  1. HEMORANDUH TO: FILE DATE

    Office of Legacy Management (LM)

    --- 0 Production 0 DisposalStorage TYPE OF CONTRACT ---w--w----- 0 Prime 0 Subcontractrk 0 Purchase Order 0 Other information (i.e., cost + fixed fee, unit...

  2. United States Government DATE:

    Office of Legacy Management (LM)

    ... and subcontracts with the University of Chicago (Metallurgical Laboratory) and DuPont. ... by the University of Chicago and DuPont and approved by a Government contracting officer. ...

  3. MEMORANDUM TO: FILE DATE

    Office of Legacy Management (LM)

    LANDS u cl BUILDINGS 0 EQUIPMENT ORE OR RAW MATL 0 : : cl Cl FINAL PRODUCT 3 WASTE & RESIDUE q "E ontrol a Health Physics Protection 0 AECMED managed operations n Little or None ...

  4. MEtlORANDUM DATE

    Office of Legacy Management (LM)

    FIATERIALS HANDLEDt ---....4------ WHealth Physics Protection Little or None mECMED responsibility *Contractor responsibility ' Typo (on basis of records reviewed) . :. ...

  5. MEMORANDUM TO: FILE DATE

    Office of Legacy Management (LM)

    ' .I",. ,,' , ..I> .; .Whd I' NVO&tllT PIT SITE Control q Health Physics Protection 0 AECMED managed operations ,gLittle or None 0 AECMED responsible for c ...

  6. TO: FILE DATE------

    Office of Legacy Management (LM)

    ---... -- Cantrol k tiiait6 Physics Protection . q AECHED managed operation; ... 17. 1944 Deer Colonel Ruhoff: The Physics Group nttachoj 10 our project is very ...

  7. MEMORANDUM TO: FILE DATE

    Office of Legacy Management (LM)

    -...---...---... CIECtlED INVOLVEME'JT AT SITE ,,---...,-,-,-',,,,,---... Control q Health Physics Protection . ...

  8. MEMORANDUM TO: FILE DATE

    Office of Legacy Management (LM)

    AECMED INVOLVEMEVT AT SITE ---... ----- ---. ----- ----- Control v Health Physics Protection - Cl AEWMED managed operations 0 AECMED responsible for dLittle or None ...

  9. TO: FILE DATE

    Office of Legacy Management (LM)

    c AECRED overviewed operations &+--Contractor had total control a unknown q Health Physics Protection ; c Little or None : c AECMED responsibility qContractoi'responsibility ...

  10. DATE: TO: FROM:

    Office of Environmental Management (EM)

    been manufactured in the United States using the "substantial transformation" standard derived from Federal court cases, Customs Department administrative rulings and interpretive...

  11. DATE: TO: FROM:

    Office of Environmental Management (EM)

    and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Class Deviation by General Services Administration (GSA) to Federal Acquisition Regulation...

  12. DATE: TO: FROM:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...procurement-and-acquisitionpolicy-flashes Questions concerning this policy flash should be directed to Mike Larson at 202-287-1426 or email at Michael.Larson@hq.doe.gov.

  13. DATE: TO: FROM:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Each variation cross references its related Section I clause. This Flash and its attachments will be available online within a day, at the following website: http:...

  14. Date Times Group Speakers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Group Research Meeting Toms Arias Mon, 3-10 2:30-3:30pm Faculty Meeting Richard Robinson Fri, 3-14 12:30-1:30pm Student & Postdoc Mtg Michael Zachman (Kourkoutis) & Deniz...

  15. ISSUANCE 2015-04-29: Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters Notice of petition to extend test procedure compliance date and request for comment

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters; Notice of petition to extend test procedure compliance date and request for comment.

  16. Round-robin 230Th–234U age dating of bulk uranium for nuclear forensics

    SciTech Connect (OSTI)

    Gaffney, Amy M.; Hubert, Amélie; Kinman, William S.; Magara, Masaaki; Okubo, Ayako; Pointurier, Fabien; Schorzman, Kerri C.; Steiner, Robert E.; Williams, Ross W.

    2015-07-30

    In an inter-laboratory measurement comparison study, four laboratories determined 230Th–234U model ages of uranium certified reference material NBL U050 using isotope dilution mass spectrometry. The model dates determined by the participating laboratories range from 9 March 1956 to 19 October 1957, and are indistinguishable given the associated measurement uncertainties. As a result, these model ages are concordant with to slightly older than the known production age of NBL U050.

  17. Extension of DOE O 135.1, Budget Execution-Funds Distribution And Control

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-11-29

    This Notice extends DOE O 135.1, Budget Execution-Funds Distribution and Control, dated 9-30-95 until 9-30-00. This Notice will remain in effect until its expiration date or until such time as the revised Order is published.

  18. Extension of DOE O 534.1, Accounting

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-09-09

    This Notice extends DOE O 534.1, ACCOUNTING, dated 9-29-95, from 9-29-99 to 9-29-00. A draft of the Order is currently in the comment resolution process. This Notice will remain in effect until its expiration date or until such time as the revised Order is published.

  19. sup 40 Ar/ sup 39 laser-probe dating by step heating and spot fusion of phengites from the Dora Maira nappe of the western Alps, Italy

    SciTech Connect (OSTI)

    Scaillet, S.; Feraud, G. ); Lagabrielle, Y. ); Ballevre, M.; Ruffet, G. )

    1990-08-01

    {sup 40}Ar/{sup 39}Ar laser-probe dating of phengitic micas has been carried out by step-heating and spot-fusion procedures. These micas represent successive deformation stages in the structural evolution of the internal Dora Maira nappe, western Alps. Single phengites from a gneiss affected by a single ductile strain under retrogressive conditions (sample 99.1) display complete isotopic resetting with nearly homogeneous intracrystalline Ar distribution and yield plateau ages of about 40 Ma. Small clusters of phengites from an earlier foliation were selected from a polydeformed mica schist (sample PTX3). They show a partial isotopic resetting in response to overprinting during the retrogressive deformation stage with a concentric age zoning from 68 Ma on the rim to 87 Ma in the core one cleavage plane. This zonation is fully consistent with the laser-derived discordant age spectrum, which ranges from 40 to 90 Ma from low to high temperatures. According to the deformation history of both samples, these preliminary data suggest a deformation control on Ar migration during recrystallization processes, and they are consistent with the timing of the collisional evolution previously reported for southern Dora Maira units. This study shows that the {sup 40}Ar/{sup 39}Ar continuous laser-probe dating technique produces data accurate enough to discriminate several tectonometamorphic episodes recorded in single hand samples.

  20. ALPHA SPECTROMETRIC EVALUATION OF SRM-995 AS A POTENTIAL URANIUM/THORIUM DOUBLE TRACER SYSTEM FOR AGE-DATING URANIUM MATERIALS

    SciTech Connect (OSTI)

    Beals, D.

    2011-12-06

    Uranium-233 (t{sub 1/2} {approx} 1.59E5 years) is an artificial, fissile isotope of uranium that has significant importance in nuclear forensics. The isotope provides a unique signature in determining the origin and provenance of uranium-bearing materials and is valuable as a mass spectrometric tracer. Alpha spectrometry was employed in the critical evaluation of a {sup 233}U standard reference material (SRM-995) as a dual tracer system based on the in-growth of {sup 229}Th (t{sub 1/2} {approx} 7.34E3 years) for {approx}35 years following radiochemical purification. Preliminary investigations focused on the isotopic analysis of standards and unmodified fractions of SRM-995; all samples were separated and purified using a multi-column anion-exchange scheme. The {sup 229}Th/{sup 233}U atom ratio for SRM-995 was found to be 1.598E-4 ({+-} 4.50%) using recovery-corrected radiochemical methods. Using the Bateman equations and relevant half-lives, this ratio reflects a material that was purified {approx} 36.8 years prior to this analysis. The calculated age is discussed in contrast with both the date of certification and the recorded date of last purification.