Sample records for 12th five-year plan

  1. Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan

    SciTech Connect (OSTI)

    Ohshita, Stephanie; Price, Lynn

    2011-03-21T23:59:59.000Z

    Experience with China's 20% energy intensity improvement target during the 11th Five-Year Plan (FYP) (2006-2010) has shown the challenges of rapidly setting targets and implementing measures to meet them. For the 12th FYP (2011-2015), there is an urgent need for a more scientific methodology to allocate targets among the provinces and to track physical and economic indicators of energy and carbon saving progress. This report provides a sectoral methodology for allocating a national energy intensity target - expressed as percent change in energy per unit gross domestic product (GDP) - among China's provinces in the 12th FYP. Drawing on international experience - especially the European Union (EU) Triptych approach for allocating Kyoto carbon targets among EU member states - the methodology here makes important modifications to the EU approach to address an energy intensity rather than a CO{sub 2} emissions target, and for the wider variation in provincial energy and economic structure in China. The methodology combines top-down national target projections and bottom-up provincial and sectoral projections of energy and GDP to determine target allocation of energy intensity targets. Total primary energy consumption is separated into three end-use sectors - industrial, residential, and other energy. Sectoral indicators are used to differentiate the potential for energy saving among the provinces. This sectoral methodology is utilized to allocate provincial-level targets for a national target of 20% energy intensity improvement during the 12th FYP; the official target is determined by the National Development and Reform Commission. Energy and GDP projections used in the allocations were compared with other models, and several allocation scenarios were run to test sensitivity. The resulting allocations for the 12th FYP offer insight on past performance and offer somewhat different distributions of provincial targets compared to the 11th FYP. Recommendations for reporting and monitoring progress on the targets, and methodology improvements, are included.

  2. Research Councils UK The Government of India's 12th five-year plan (2012-2017) focuses

    E-Print Network [OSTI]

    Berzins, M.

    in India to align existing priorities and to scope areas of mutual research and policy interest. In doingResearch Councils UK engaging with India #12;The Government of India's 12th five-year plan (2012 in the global R&D rankings, India is clearly a partner of choice for the UK and the UK Research Councils. We

  3. EM Five-Year Plan (FY2008 - FY2012)

    Broader source: Energy.gov (indexed) [DOE]

    ...150 Lawrence Berkeley National Laboratory (LBNL) is not included in DOE-EM Five Year Plan FY 2008 - FY 2012. LBNL site is expected to...

  4. Department of Energy Five Year Plans, FY2007-2011 and FY2008-FY2012

    Broader source: Energy.gov [DOE]

    The purpose of the EM Five Year Plans was to describe EM's planned strategies, funding and accomplishments over a five year span.

  5. The UC Berkeley Strategic Academic Plan: Five-Year Review

    E-Print Network [OSTI]

    Jacobs, Lucia

    ://www.berkeley.edu/news/media/releases/2003/05/sap/plan.pdf. A one-year review was done in 2003. This five-year review provides. Current projections indicate that the campus will enroll approximately 34,500 FTE by 2010-11, or 1 for the system over the next decade, and it is critical that Berkeley continues to play its leading role

  6. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric...

    Energy Savers [EERE]

    Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric...

  7. Twenty-Five Year Site Plan FY2013 - FY2037

    SciTech Connect (OSTI)

    Jones, William H. [Los Alamos National Laboratory

    2012-07-12T23:59:59.000Z

    Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual basis. At the same time, major modernization projects will require new line-item funding. This document is, in essence, a roadmap that defines a path forward for the Laboratory to modernize, streamline, consolidate, and sustain its infrastructure to meet its national security mission.

  8. Five-Year Master Plan University of Michigan-Ann Arbor

    E-Print Network [OSTI]

    Kamat, Vineet R.

    Five-Year Master Plan University of Michigan-Ann Arbor Prepared by: University of Michigan-Ann Arbor Facilities and Operations October 31, 2014 #12;FIVE-YEAR MASTER PLAN UNIVERSITY OF MICHIGAN of Contents 1 #12;Section I Mission Statement #12;MISSION STATEMENT The mission of the University of Michigan

  9. FY 2013 Major Capital Outlay Project Request and Five-Year Comprehensive Master Plan

    E-Print Network [OSTI]

    in the following specific areas: Transmission & Distribution (smart grids technology, cyber-security) GenerationFY 2013 Major Capital Outlay Project Request and Five-Year Comprehensive Master Plan September 2011 ____ No _X__ Is There a Five-Year Capital Outlay Plan Available? Yes _X__ No ____ Are Professionally

  10. Being Relevant in Tough Times: TRIUMF's Five-Year Plan

    ScienceCinema (OSTI)

    Tim Meyer

    2010-01-08T23:59:59.000Z

    Perhaps better known to the international community than its own neighbors, TRIUMF is Canada's national laboratory for particle and nuclear physics. Working with the Canadian scientific community, TRIUMF has formulated a new vision to transform the laboratory and deliver a whole new level of performance and impact. The plan capitalizes on platform technologies (superconducting RF cavities for accelerator physics and radiotracers in nuclear medicine) and exploits Canada's role in ATLAS and the LHC. I will describe the key elements of the plan and discuss the science-policy landscape in which TRIUMF must make its case.

  11. Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan

    E-Print Network [OSTI]

    Ohshita, Stephanie

    2011-01-01T23:59:59.000Z

    to construction and heavy industry, contrary to the 20%intensive construction and heavy industry sectors, theand production in heavy industry and shift toward lower-

  12. Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan

    E-Print Network [OSTI]

    Ohshita, Stephanie

    2011-01-01T23:59:59.000Z

    See discussion of this report in ETSU, AEA Technology, 2001.environment/ccl/pdf/etsu-analysis.pdf European Environmentpossible technologies (ETSU, 1999). Then, for the ten

  13. Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan

    E-Print Network [OSTI]

    Ohshita, Stephanie

    2011-01-01T23:59:59.000Z

    energy in the total energy mix was determined in theOther energy in the total energy mix was much smaller thanwell as the different mix of energy and economic structure

  14. Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan

    E-Print Network [OSTI]

    Ohshita, Stephanie

    2011-01-01T23:59:59.000Z

    variation in energy consumption trends among the provinces,applies similar energy consumption trends for the five yearsvariation in energy consumption trends among the provinces,

  15. Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan

    E-Print Network [OSTI]

    Ohshita, Stephanie

    2011-01-01T23:59:59.000Z

    Hebei Shanxi Inner Mongolia Liaoning Jilin HeilongjiangHebei Shanxi Inner Mongolia Liaoning Jilin HeilongjiangHebei Shanxi Inner Mongolia Liaoning Jilin Heilongjiang

  16. Five-Year MD Enrichment Program Application/Plan University of Connecticut School of Medicine

    E-Print Network [OSTI]

    Oliver, Douglas L.

    Five-Year MD Enrichment Program Application/Plan University of Connecticut School of Medicine Full_________________________________ Proposed graduation date_________________________ Outline of enrichment plan: (specify date)____________ Please detail on a month-to- month basis your enrichment program (Be specific): Academic Year

  17. Information Systems and Decision Sciences Five-Year Strategic Plan for National Prominence

    E-Print Network [OSTI]

    1 Information Systems and Decision Sciences Five-Year Strategic Plan for National Prominence 2010 to the advancement of knowledge in information systems and decision sciences; Delivering high quality degree programs that produce graduates who will excel in in information systems and decision sciences; Providing

  18. Five-Year Master Plan University of Michigan-Ann Arbor

    E-Print Network [OSTI]

    Kamat, Vineet R.

    Five-Year Master Plan University of Michigan-Ann Arbor Prepared by: University of Michigan UNIVERSITY OF MICHIGAN-ANN ARBOR FY2015 TABLE OF CONTENTS I. Mission Statement II. Instructional Programming The mission of the University of Michigan is to serve the people of Michigan and the world through preeminence

  19. Five-Year Master Plan University of Michigan-Ann Arbor

    E-Print Network [OSTI]

    Kamat, Vineet R.

    Five-Year Master Plan University of Michigan-Ann Arbor Prepared by: University of Michigan UNIVERSITY OF MICHIGAN-ANN ARBOR TABLE OF CONTENTS I. Mission Statement II. Instructional Programming III The mission of the University of Michigan is to serve the people of Michigan and the world through preeminence

  20. Chief Financial Officer FY 1997 status report and five-year plan

    SciTech Connect (OSTI)

    NONE

    1997-10-01T23:59:59.000Z

    The Chief Financial Officers Act of 1990 (CFO Act) establishes the legal framework for improved Federal financial management. The Act requires the agency CFO to prepare, and annually revise, a plan to implement the Office of Management and Budget (OMB) Federal Financial Management Status Report and Five-Year Plan. This is the sixth Status Report and Five-Year Plan submission to OMB by the Department of Energy (DOE). Financial management at the Department operates in an environment of Government-wide efforts to improve financial management and implements legislation and administrative provisions which stress the need for change. This report sets forth the Department`s plans for financial management improvements in the coming years. It also highlights several new initiatives completed or currently underway that will significantly improve the overall effectiveness of financial management at the Department of Energy.

  1. U.S. Department of Energy clean cities five-year strategic plan.

    SciTech Connect (OSTI)

    Cambridge Concord Associates

    2011-02-15T23:59:59.000Z

    Clean Cities is a government-industry partnership sponsored by the U.S. Department of Energy's (DOE) Vehicle Technologies Program, which is part of the Office of Energy Efficiency and Renewable Energy. Working with its network of about 100 local coalitions and more than 6,500 stakeholders across the country, Clean Cities delivers on its mission to reduce petroleum consumption in on-road transportation. In its work to reduce petroleum use, Clean Cities focuses on a portfolio of technologies that includes electric drive, propane, natural gas, renewable natural gas/biomethane, ethanol/E85, biodiesel/B20 and higher-level blends, fuel economy, and idle reduction. Over the past 17 years, Clean Cities coalitions have displaced more than 2.4 billion gallons of petroleum; they are on track to displace 2.5 billion gallons of gasoline per year by 2020. This Clean Cities Strategic Plan lays out an aggressive five-year agenda to help DOE Clean Cities and its network of coalitions and stakeholders accelerate the deployment of alternative fuel and advanced technology vehicles, while also expanding the supporting infrastructure to reduce petroleum use. Today, Clean Cities has a far larger opportunity to make an impact than at any time in its history because of its unprecedented $300 million allocation for community-based deployment projects from the American Recovery and Reinvestment Act (ARRA) (see box below). Moreover, the Clean Cities annual budget has risen to $25 million for FY2010 and $35 million has been requested for FY2011. Designed as a living document, this strategic plan is grounded in the understanding that priorities will change annually as evolving technical, political, economic, business, and social considerations are woven into project decisions and funding allocations. The plan does not intend to lock Clean Cities into pathways that cannot change. Instead, with technology deployment at its core, the plan serves as a guide for decision-making at both the national and local levels of Clean Cities over the next five years. The plan recognizes the need for flexibility and sets out a strategic direction that will build on the progress of current technologies and new opportunities presented in emerging fuels and technologies, such as hydrogen and fuel cells, as well as new niche markets such as off-road applications that build additional throughput at existing alternative fuel stations.

  2. Energy Management: A Corporate Objective in the Five-Year Business Plan

    E-Print Network [OSTI]

    Mulhern, T. A.

    1982-01-01T23:59:59.000Z

    This paper presents the Energy Management Program developed by the Western Electric Company. The program includes managerial accountabilities; administrative and technical activities; and a most recently implemented comprehensive five-year energy...

  3. Energy Management: A Corporate Objective in the Five-Year Business Plan

    E-Print Network [OSTI]

    Mulhern, T. A.

    1982-01-01T23:59:59.000Z

    This paper presents the Energy Management Program developed by the Western Electric Company. The program includes managerial accountabilities; administrative and technical activities; and a most recently implemented comprehensive five-year energy...

  4. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Departmentof OhioFirst Annual PostSmart Grid Progress |

  5. Five year research plan, 1988--1992: Energy from the earth: Geothermal energy program

    SciTech Connect (OSTI)

    Not Available

    1988-10-01T23:59:59.000Z

    Consistent with national energy policy guidance, the plan concentrates on research and development (R and D) and limits system experiments to only those necessary to stimulate industrial confidence in the validity of research findings. A key strategy element is the continuation of the government/industry partnership which is critical to successful development of geothermal technology. The primary near-term research emphasis is the extension of hydrothermal technology options for reservoir identification, reservoir analysis, hard rock penetration, and flash and binary electric plants. The advanced geothermal resources--geopressured, hot dry rock, and magma--are longer-term and higher-risk focal points, and research in these areas centers on establishing a technology base that will allow industry to make prudent and timely investment decisions with respect to the use of these resources. 13 figs.

  6. Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?

    SciTech Connect (OSTI)

    Zhou, Nan; Lin, Jiang; Zhou, Nan; Levine, Mark; Fridley, David

    2007-07-01T23:59:59.000Z

    China's 11th Five-Year Plan (FYP) sets an ambitious target for energy-efficiency improvement: energy intensity of the country's gross domestic product (GDP) should be reduced by 20% from 2005 to 2010 (NDRC, 2006). This is the first time that a quantitative and binding target has been set for energy efficiency, and signals a major shift in China's strategic thinking about its long-term economic and energy development. The 20% energy intensity target also translates into an annual reduction of over 1.5 billion tons of CO2 by 2010, making the Chinese effort one of most significant carbon mitigation effort in the world today. While it is still too early to tell whether China will achieve this target, this paper attempts to understand the trend in energy intensity in China and to explore a variety of options toward meeting the 20% target using a detailed end-use energy model.

  7. Five Year Plan

    Office of Environmental Management (EM)

    remediation waste, including equipment, as low- level waste. The Solid Waste Management Unit release site will be remediated by bioremediation followed by soil excavation, ex-situ...

  8. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    SciTech Connect (OSTI)

    Zhou, Nan; Mcneil, Michael; Levine, Mark

    2011-03-01T23:59:59.000Z

    China's 11th Five-Year Plan (FYP) sets an ambitious target to reduce the energy intensity per unit of gross domestic product (GDP) by 20% from 2005 to 2010 (NDRC, 2006). In the building sector, the primary energy-saving target allocated during the 11 FYP period is 100 Mtce. Savings are expected to be achieved through the strengthening of enforcement of building energy efficiency codes, existing building retrofits and heat supply system reform, followed by energy management of government office buildings and large scale public buildings, adoption of renewable energy sources. To date, China has reported that it achieved the half of the 20% intensity reduction target by the end of 2008, however, little has been made clear on the status and the impact of the building programs. There has also been lack of description on methodology for calculating the savings and baseline definition, and no total savings that have been officially reported to date. This paper intends to provide both quantitative and qualitative assessment of the key policies and programs in building sector that China has instituted in its quest to fulfill the national goal. Overall, this paper concludes that the largest improvement for building energy efficiency were achieved in new buildings; the program to improve the energy management in government and large scale public buildings are in line with the target; however the progress in the area of existing building retrofits, particularly heating supply system reform lags behind the stated goal by a large amount.

  9. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    SciTech Connect (OSTI)

    Zhou, Nan; McNeil, Michael; Levine, Mark

    2010-06-07T23:59:59.000Z

    China's 11th Five-Year Plan (FYP) sets an ambitious target to reduce the energy intensity per unit of gross domestic product (GDP) by 20% from 2005 to 2010 (NDRC, 2006). In the building sector, the primary energy-saving target allocated during the 11 FYP period is 100 Mtce. Savings are expected to be achieved through the strengthening of enforcement of building energy efficiency codes, existing building retrofits and heat supply system reform, followed by energy management of government office buildings and large scale public buildings, adoption of renewable energy sources. To date, China has reported that it achieved the half of the 20% intensity reduction target by the end of 2008, however, little has been made clear on the status and the impact of the building programs. There has also been lack of description on methodology for calculating the savings and baseline definition, and no total savings that have been officially reported to date. This paper intend to provide both quantitative and qualitative assessment of the key policies and programs in building sector that China has instituted in its quest to fulfill the national goal. Overall, this paper concludes that the largest improvement for building energy efficiency were achieved in new buildings; the program to improve the energy management in government and large scale public buildings are in line with the target; however the progress in the area of existing building retrofit particularly heat supply system reform lags the stated goal by a large amount.

  10. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    SciTech Connect (OSTI)

    Levine, Mark D.; Price, Lynn; Zhou, Nan; Fridley, David; Aden, Nathaniel; Lu, Hongyou; McNeil, Michael; Zheng, Nina; Yining, Qin; Yowargana, Ping

    2010-04-28T23:59:59.000Z

    During the period 1980 to 2002, China experienced a 5% average annual reduction in energy consumption per unit of gross domestic product (GDP). The period 2002-2005 saw a dramatic reversal of the historic relationship between energy use and GDP growth: energy use per unit of GDP increased an average of 3.8% per year during this period (NBS, various years). China's 11th Five Year Plan (FYP), which covers the period 2006-2010, required all government divisions at different levels to reduce energy intensity by 20% in five years in order to regain the relationship between energy and GDP growth experienced during the 1980s and 1990s. This report provides an assessment of selected policies and programs that China has instituted in its quest to fulfill the national goal of a 20% reduction in energy intensity by 2010. The report finds that China has made substantial progress toward its goal of achieving 20% energy intensity reduction from 2006 to 2010 and that many of the energy-efficiency programs implemented during the 11th FYP in support of China's 20% energy/GDP reduction goal appear to be on track to meet - or in some cases even exceed - their energy-saving targets. It appears that most of the Ten Key Projects, the Top-1000 Program, and the Small Plant Closure Program are on track to meet or surpass the 11th FYP savings goals. China's appliance standards and labeling program, which was established prior to the 11th FYP, has become very robust during the 11th FYP period. China has greatly enhanced its enforcement of new building energy standards but energy-efficiency programs for buildings retrofits, as well as the goal of adjusting China's economic structure to reduce the share of energy consumed by industry, do not appear to be on track to meet the stated goals. With the implementation of the 11th FYP now bearing fruit, it is important to maintain and strengthen the existing energy-saving policies and programs that are successful while revising programs or adding new policy mechanisms to improve the programs that are not on track to achieve the stated goals.

  11. Ohio University Strategic Planning Path, 2004-2016 Prompted by an interest in narrowing the scope of the Five Year Vision Ohio Implementation Plan (FYVOIP) and by new planning realities

    E-Print Network [OSTI]

    Botte, Gerardine G.

    2014 2015 2016 Presidential Task Force Vision OHIO Five Year Vision Ohio Implementation Plan Recession that fiscal and capital resources are stable and permit ongoing strategic investment. While work proceeded

  12. Five-Year Implementation Plan For Advanced Separations and Waste Forms Capabilities at the Idaho National Laboratory (FY 2011 to FY 2015)

    SciTech Connect (OSTI)

    Not Listed

    2011-03-01T23:59:59.000Z

    DOE-NE separations research is focused today on developing a science-based understanding that builds on historical research and focuses on combining a fundamental understanding of separations and waste forms processes with small-scale experimentation coupled with modeling and simulation. The result of this approach is the development of a predictive capability that supports evaluation of separations and waste forms technologies. The specific suite of technologies explored will depend on and must be integrated with the fuel development effort, as well as an understanding of potential waste form requirements. This five-year implementation plan lays out the specific near-term tactical investments in people, equipment and facilities, and customer capture efforts that will be required over the next five years to quickly and safely bring on line the capabilities needed to support the science-based goals and objectives of INLs Advanced Separations and Waste Forms RD&D Capabilities Strategic Plan.

  13. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    SciTech Connect (OSTI)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2001-09-01T23:59:59.000Z

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as vegetation height, shrub cover, or other parameters, which are known to provide life history requisites for mitigation species. Habitat Suitability Indices range from 0 to 1, with an HSI of 1 providing optimum habitat conditions for the selected species. One acre of optimum habitat provides one Habitat Unit. The objective of continued management of the Wanaket Wildlife Mitigation Area, including protection and enhancement of upland and wetland/wetland associated cover types, is to provide and maintain 2,334 HU's of protection credit and generate 2,495 HU's of enhancement credit by the year 2004.

  14. Industrial sector energy conservation programs in the People`s Republic of China during the seventh five-year plan (1986--1990)

    SciTech Connect (OSTI)

    Liu Zhiping [State Planning Commission, Beijing (China). Energy Research Inst.; Sinton, J.E.; Yang Fuqiang; Levine, M.D.; Ting, M.K. [Lawrence Berkeley Lab., CA (United States)

    1994-09-01T23:59:59.000Z

    The impetus at the national level to invest in energy conservation is quite strong and has long been reflected not only in official pronouncements, but also in the investments and organizational activities of the Chinese government. In the early 1980s the central government began a program of direct investments in industrial energy conservation that continues to the present. In addition, concurrently established governmental and quasi-governmental agencies have pursued conservation through administrative and educational measures. In Section 2 of this paper the authors outline the policies and institutions that supported China`s program of energy conservation investments in the Sixth and Seventh Five-Year Plans (FYPs) (1981--1985 and 1986--1990). In Section 3 they describe examples of the types of conservation projects pursued in four industrial subsectors: ferrous metals manufacturing; non-ferrous metals mining and manufacturing; chemicals manufacturing; and building materials manufacturing. Section 4 presents a simple methodology for comparing the costs of energy conservation to those of energy supply. Further discussion points out the applicability and limitations of this methodology to State Planning Commission published statistical material on the overall results of energy conservation investments. Though problematic, such analysis indicates that energy conservation investments were probably substantially cheaper than investments in equivalent energy supply would have been. They end with a discussion of some of the difficulties encountered in carrying out the conservation investment programs.

  15. Iskuulpa Watershed Management Plan : A Five-Year Plan for Protecting and Enhancing Fish and Wildlife Habitats in the Iskuulpa Watershed.

    SciTech Connect (OSTI)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2003-01-01T23:59:59.000Z

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receive credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.

  16. 1992 five year battery forecast

    SciTech Connect (OSTI)

    Amistadi, D.

    1992-12-01T23:59:59.000Z

    Five-year trends for automotive and industrial batteries are projected. Topic covered include: SLI shipments; lead consumption; automotive batteries (5-year annual growth rates); industrial batteries (standby power and motive power); estimated average battery life by area/country for 1989; US motor vehicle registrations; replacement battery shipments; potential lead consumption in electric vehicles; BCI recycling rates for lead-acid batteries; US average car/light truck battery life; channels of distribution; replacement battery inventory end July; 2nd US battery shipment forecast.

  17. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    Plans Organization and Implementation of Energy ConservationIndustrial Energy Conservation Investment Funding 3.Case Studies of Energy Conservation Investments by Industry

  18. 1995 shipment review & five year forecast

    SciTech Connect (OSTI)

    Fetherolf, D.J. Jr. [East Penn Manufacturing Co., Inc., Lyon Station, PA (United States)

    1996-01-01T23:59:59.000Z

    This report describes the 1995 battery shipment review and five year forecast for the battery market. Historical data is discussed.

  19. G. Vlad 10th ITPA MHD Topical Group Meeting at IPP-Garching 10th -12th October 2007 1 Progress and plans for the

    E-Print Network [OSTI]

    Vlad, Gregorio

    G. Vlad 10th ITPA MHD Topical Group Meeting at IPP-Garching 10th -12th October 2007 1 Progress at IPP-Garching 10th -12th October 2007 2 The HMGC code Hybrid MHD-Gyrokinetic Code (HMGC): thermal (but particle nonlinearities fully retained) #12;G. Vlad 10th ITPA MHD Topical Group Meeting at IPP-Garching

  20. Five year rollover hedges for agricultural lenders

    E-Print Network [OSTI]

    Floyd, John Christopher

    1988-01-01T23:59:59.000Z

    FIVE YEAR ROLLOVER HEDGES FOR AGRICULTURAL LEADERS A Professional Paper by John Christopher Floyd. Jr. Submitted to the College of Agriculture of Texas ARM University In Partial Fulfillment of the Requirements for the Degree of Master... of Agriculture May, 19BB Advisor Or. David J. Leatham Major Subject: Agricultural Economics FIVE YEAR ROLLOVER HEDGE FOR AGRICULTURAL LEMDERS A Professional Paper by John Christopher Floyd, Jr. Approved as to style and content by: an. Advis ry C...

  1. 12th Annual Minnesota Pavement

    E-Print Network [OSTI]

    Minnesota, University of

    12th Annual Minnesota Pavement Conference: Session Summaries Conference Sponsors: Minnesota Research Alliance (TERRA) Pavement Research Institute (PRI) Hosted by: Center for Transportation Studies provides information to practitioners and others in pavement design, construction, and maintenance

  2. Five-Year Technology Development Strategic Plan Targets EM's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    their applications to current Office of D&D and Facility Engineering needs, and the EM Robot Challenge, an initiative to give robotic companies an opportunity to demonstrate...

  3. Komsomol participation in the Soviet First Five-Year Plan

    E-Print Network [OSTI]

    Todd, Ann

    1985-01-01T23:59:59.000Z

    will similarly expose processes unique to that system at that time. The most important youth group in Soviet Russia during the years 1928-1933 wa. s the Komsomol, an acronym for Communist Youth League (Kommunisticheskii Soiuz Molodezhi). Before examining... Russia. It featured seemingly endless columns on the goals of the Party and the opportunities for youth to participate. Entries on Marxism-Leninism were given new meaning in the context of sacrifice and struggle. Especially emphasized were...

  4. The University of Northern British Columbia Five Year Capital Plan

    E-Print Network [OSTI]

    Northern British Columbia, University of

    and for the regional campuses; To estimate the cost of the recommended capital projects and to identify preferred its scope to recommending new capital projects with an estimated cost exceeding $1M. Other yet-to- be-completed capital projects with a cost below $1M previously reported to government are listed in Appendix 2

  5. Page 1 of 20 A Five Year Diversity Plan Draft

    E-Print Network [OSTI]

    Kleshchev, Alexander

    Daughterty Carla Gary Susan Hardwick Robin Holmes Tomas Hulick Baiza Peter Keyes Khanh Le Linda Liu Chicora Laura Blake-Jones Doug Blandy Heather Bottorff Chris Browning James Chang Diane Del Guercio Kassia

  6. Environmental Justice Five-Year Implementation Plan - First Annual

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721 FederalTexas Energyof 2005Site-Level ExerciseMarch 14,

  7. India's 11th Five-year Plan | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, search OpenEIHesperia,IDGWP WindSatelliteInSAR Jump to:Efficiencypub

  8. Environmental Justice Five-Year Implementation Plan - Second Annual

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:RevisedAdvisoryStandardGeneration |10 DOE Vehicle TechnologiesProgress Report |

  9. Environmental Justice Five-Year Implementation Plan - Third and Fourth

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:RevisedAdvisoryStandardGeneration |10 DOE Vehicle TechnologiesProgress Report

  10. Environmental Justice Five-Year Implementation Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:RevisedAdvisoryStandardGeneration |10 DOE Vehicle TechnologiesProgress

  11. Argonne and Arizona State University sign five-year agreement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Argonne and Arizona State University sign five-year agreement By Greg Cunningham * May 28, 2015 Tweet EmailPrint MOU clears way for expanded research opportunities The Department...

  12. 1994 battery shipment review and five-year forecast report

    SciTech Connect (OSTI)

    Fetherolf, D. [East Penn Manufacturing Co., Lyon Station, PA (United States)

    1995-12-31T23:59:59.000Z

    This paper presents a 1994 battery shipment review and five year forecast report. Data is presented on replacement battery shipments, battery shipments, car and truck production, truck sales, original equipment, shipments for passenger cars and light commercial vehicles, and ten year battery service life trend.

  13. Computer Science at NCSU: The First Twenty-Five Years

    E-Print Network [OSTI]

    Young, R. Michael

    Computer Science at NCSU: The First Twenty-Five Years Clay Griffith Paul D. Peterson, Jr. March 17 for the study of computer science. As early as 1960, J.A. Rigney of the Department of Statistics had written to Chancellor John T. Caldwell advocating a "Department of Computing Science." Nothing concrete came

  14. FIVE-YEAR WILKINSON MICROWAVE ANISOTROPY PROBE OBSERVATIONS: SOURCE CATALOG

    SciTech Connect (OSTI)

    Wright, E. L.; Chen, X. [UCLA Physics and Astronomy, P.O. Box 951547, Los Angeles, CA 90095-1547 (United States); Odegard, N.; Hill, R. S.; Weiland, J. L. [Adnet Systems, Inc., 7515 Mission Dr., Suite A100, Lanham, MD 20706 (United States); Bennett, C. L.; Gold, B.; Larson, D. [Department of Physics and Astronomy, Johns Hopkins University, 3400 N. Charles St., Baltimore, MD 21218-2686 (United States); Hinshaw, G.; Wollack, E.; Kogut, A. [Code 665, NASA/Goddard Space Flight Center, Greenbelt, MD 20771 (United States); Jarosik, N.; Page, L.; Dunkley, J. [Department of Physics, Jadwin Hall, Princeton University, Princeton, NJ 08544-0708 (United States); Komatsu, E. [Department of Astronomy, University of Texas, Austin, 2511 Speedway, RLM 15.306, Austin, TX 78712 (United States); Nolta, M. R. [Canadian Institute for Theoretical Astrophysics, University of Toronto, 60 St. George St., Toronto, ON M5S 3H8 (Canada); Spergel, D. N. [Department of Astrophysical Sciences, Peyton Hall, Princeton University, Princeton, NJ 08544-1001 (United States); Halpern, M. [Department of Physics and Astronomy, University of British Columbia, Vancouver, BC V6T 1Z1 (Canada); Limon, M. [Columbia Astrophysics Laboratory, 550 W. 120th St., Mail Code 5247, New York, NY 10027-6902 (United States); Meyer, S. S. [Departments of Astrophysics and Physics, KICP and EFI, University of Chicago, Chicago, IL 60637 (United States)], E-mail: wright@astro.ucla.edu (and others)

    2009-02-15T23:59:59.000Z

    We present the list of point sources found in the Wilkinson Microwave Anisotropy Probe (WMAP) five-year maps. The technique used in the first-year and three-year analyses now finds 390 point sources, and the five-year source catalog is complete for regions of the sky away from the Galactic plane to a 2 Jy limit, with SNR >4.7 in all bands in the least covered parts of the sky. The noise at high frequencies is still mainly radiometer noise, but at low frequencies the cosmic microwave background (CMB) anisotropy is the largest uncertainty. A separate search of CMB-free V-W maps finds 99 sources of which all but one can be identified with known radio sources. The sources seen by WMAP are not strongly polarized. Many of the WMAP sources show significant variability from year to year, with more than a 2:1 range between the minimum and maximum fluxes.

  15. Laboratory hosts 12th annual HAZMAT Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes |Is Your Home asLCLSLaboratory DirectorsRecovery ActLaboratory12th

  16. The Five Year Fermi/GBM Magnetar Burst Catalog

    E-Print Network [OSTI]

    Collazzi, A C; van der Horst, A J; Younes, G A; Kaneko, Y; Gogus, E; Lin, L; Granot, J; Finger, M H; Chaplin, V L; Huppenkothen, D; Watts, A L; von Kienlin, A; Baring, M G; Gruber, D; Bhat, P N; Gibby, M H; Gehrels, N; McEnery, J; van der Klis, M; Wijers, R A M J

    2015-01-01T23:59:59.000Z

    Since launch in 2008, the Fermi Gamma-ray Burst Monitor (GBM) has detected many hundreds of bursts from magnetar sources. While the vast majority of these bursts have been attributed to several known magnetars, there is also a small sample of magnetar-like bursts of unknown origin. Here we present the Fermi/GBM magnetar catalog, giving the results of the temporal and spectral analyses of 440 magnetar bursts with high temporal and spectral resolution. This catalog covers the first five years of GBM magnetar observations, from July 2008 to June 2013. We provide durations, spectral parameters for various models, fluences and peak fluxes for all the bursts, as well as a detailed temporal analysis for SGR J1550-5418 bursts. Finally, we suggest that some of the bursts of unknown origin are associated with the newly discovered magnetar 3XMM J185246.6+0033.7.

  17. 12TH DIESEL ENGINE-EFFICIENCY AND EMISSIONS RESEARCH CONFERENCE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2TH DIESEL ENGINE-EFFICIENCY AND EMISSIONS RESEARCH CONFERENCE (DEER 2006) PRESENTATIONS 12TH DIESEL ENGINE-EFFICIENCY AND EMISSIONS RESEARCH CONFERENCE (DEER 2006) PRESENTATIONS...

  18. Completion of the Five-Year Reviews for the Monticello, Utah...

    Energy Savers [EERE]

    Contaminated Properties Site (Monticello Vicinity Properties) and the Monticello Mill Tailings Site Completion of the Five-Year Reviews for the Monticello, Utah, Radioactively...

  19. Endovascular Treatment of Femoropopliteal Aneurysms: A Five-Year Experience

    SciTech Connect (OSTI)

    Lagana, Domenico, E-mail: donlaga@gmail.com; Carrafiello, Gianpaolo; Mangini, Monica [University of Insubria, Department of Radiology (Italy); Caronno, Roberto [University of Insubria, Department of Vascular Surgery (Italy); Giorgianni, Andrea; Lumia, Domenico [University of Insubria, Department of Radiology (Italy); Castelli, Patrizio [University of Insubria, Department of Vascular Surgery (Italy); Fugazzola, Carlo [University of Insubria, Department of Radiology (Italy)

    2006-10-15T23:59:59.000Z

    Purpose. To assess the effectiveness of endovascular treatment of femoropopliteal aneurysms (FPAs). Methods. In the last 5 years, we have treated 17 FPAs (diameter 21-75 cm, mean 38.4 cm; length 27-100 cm, mean 72.5 cm) in 15 patients (age 57-80 years, mean 70.9 years). The diagnosis was obtained by color Doppler ultrasound (CDU) and the procedure was planned by CT angiography (CTA) and preprocedural angiography. Eight FPAs were excluded with only one stent-graft; in 8 patients, two stent-grafts were positioned; and in 1 patient, three stent-grafts were used. In 14 cases we used a Wallgraft endoprosthesis, in 2 cases a Hemobahn, and in 1 case an Excluder contralateral leg. The patients were followed up with CDU and occasionally with CTA. Results. Immediate technical success was obtained in 17 of 17 cases (100%). One patient died during the first year. During a mean follow-up of 26.9 months (range 3-60 months) we observed 6 of 16 (38%) stent-graft occlusions (3 of which were recanalized with locoregional thrombolysis and 3 with mechanical thrombectomy). Two stent-grafts were patent at 12 and 24 months. Four patients experienced subsequent occlusions and recanalizations until corrected by surgical bypass (1 at 14 months, 2 at 18 months, and 1 at 36 months). Therefore the primary patency was 63% and assisted patency was 73%. Conclusion. The endovascular approach is a minimally invasive treatment option for FPAs. Moreover endovascular stent-grafting does not necessarily preclude conventional surgical repair, but it can delay it. Longer follow-up will be needed to determine the long-term patency rate.

  20. Innostock 2012 The 12th International Conference on Energy Storage

    E-Print Network [OSTI]

    exchanger (GHE) that may be used with ground source heat pump (GSHP) or underground thermal energy storage Innostock 2012 The 12th International Conference on Energy Storage 1 INNO-U-39 A quasi-two-dimensional standing column well model for ground source heat pump systems Annamalai Ramesh1 , Jeffrey Spitler2 1

  1. 12th Annual Turkmenistan International Oil and Gas Exhibition | Department

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you sureReportsofDepartmentSeriesDepartmentSmallRulemakings -of Energy 12th

  2. Final Conference Papers/Proceedings for the 12th International Congress on Radiation Research, Brisbane, Australia

    SciTech Connect (OSTI)

    None

    2003-08-22T23:59:59.000Z

    Proceedings of the 12th International Congress of Radiation Research, Brisbane, Australia, August 17-22, 20003

  3. Five-Year Technology Development Strategic Plan Targets EMs Decommissioning Challenges

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. Leaders from EM headquarters and field offices and the UKs Sellafield nuclear site gathered recently to discuss developing technologies needed to address decommissioning challenges across the Cold War cleanup program.

  4. Total quality management applications for Hanford`s five-year plan and public outreach

    SciTech Connect (OSTI)

    Peterson, J.M. [USDOE Richland Operations Office, WA (United States)

    1993-12-31T23:59:59.000Z

    The US Department of Energy has encountered problems and experienced successes and failures in the cleanup of the Hanford Site in Washington State. This paper focuses on (1) internal problems involved in managing this large and complex cleanup; (2) attempts at overcoming these problems; (3) problems and attempts at solutions in describing cleanup activities to the public and other government entities. It describes the Total Quality Management (TQM) approaches used in trying to solve these problems.

  5. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport inEnergy June 6-7, 2013 MeetingEA #FebruaryFisker, Tesla,

  6. Second Five-Year Plan to Address Uranium Contamination in the Navajo Nation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative JC3 RSS September 9,AwardGrads &Alternative Fuel| Department of Energy Second

  7. United States hurricane landfalls and damages: Can one-to five-year predictions beat climatology?

    E-Print Network [OSTI]

    Colorado at Boulder, University of

    United States hurricane landfalls and damages: Can one-to five-year predictions beat climatology-year predictions of United States hurricane landfalls and damages improve upon a baseline expectation derived from these improvements were due to chance or actual skill. A review of efforts to predict hurricane landfalls and damage

  8. LESSONS FROM FIVE YEARS OF EXPERIENCE IN ENERGY CONTRACT AUCTIONS IN SOUTH AMERICA

    E-Print Network [OSTI]

    Rudnick, Hugh

    1 LESSONS FROM FIVE YEARS OF EXPERIENCE IN ENERGY CONTRACT AUCTIONS IN SOUTH AMERICA Rodrigo) [5], Chile (2005) [6], Peru (2006) [7] and Colombia (2008) [8] have implemented energy forward for project financing purposes of new generation assets. This mechanism for competitive energy procurement

  9. Five-Year NRHP Re-Evaluation of Historic Buildings Assessment

    SciTech Connect (OSTI)

    Ullrich, R A; Heidecker, K R

    2011-09-12T23:59:59.000Z

    The Lawrence Livermore National Laboratory (LLNL) 'Draft Programmatic Agreement among the Department of Energy and the California State Historic Preservation Officer Regarding Operation of Lawrence Livermore National Laboratory' requires a review and re-evaluation of the eligibility of laboratory properties for the National Register of Historic Places (NRHP) every five years. The original evaluation was published in 2005; this report serves as the first five-year re-evaluation. This re-evaluation includes consideration of changes within LLNL to management, to mission, and to the built environment. it also determines the status of those buildings, objects, and districts that were recommended as NRHP-eligible in the 2005 report. Buildings that were omitted from the earlier building list, those that have reached 50 years of age since the original assessment, and new buildings are also addressed in the re-evaluation.

  10. THE 12th METU CONFERENCE ON INTERNATIONAL RELATIONS -CALL FOR PAPERS Turkey in the World

    E-Print Network [OSTI]

    Hasýrcý, Vasýf

    THE 12th METU CONFERENCE ON INTERNATIONAL RELATIONS - CALL FOR PAPERS Turkey in the World - CALL in Turkey on international relations, is going to be held between 12-14 June 2013, marking its 12th year in approximately 50 panels and roundtables. The topic of this year's conference is Turkey in the World. In recent

  11. Advanced Test Reactor Critical Facility safety analysis report five year currency review

    SciTech Connect (OSTI)

    Napper, P.R.; Carpenter, W.R.; Garner, R.W.

    1991-05-01T23:59:59.000Z

    By DOE-ID Order 5481.1A, a five year currency review is required of the Safety Analysis Reports of all ID or ID contractor operations having hazards of a type and magnitude not routinely encountered and/or accepted by the public. In keeping with this order, a currency review has been performed of the Advanced Test Reactor Critical Facility (ADTRC) Safety Analysis Report (SAR), Issue 003, 1990. The objectives of this currency review were to: evaluate the content, completeness, clarity of presentation and compliance with NRC Regulatory Guides and DOE Orders, etc., and evaluate the technical content of the SAR, particularly the Technical Specifications, and to evaluate the safety of continued operation of the ATRC. The reviewers concluded that although improvements may be needed in the overall content, clarity, and demonstration of compliance with current orders and regulations, the safety of the ATRC is in no way compromised and no unreviewed safety questions were identified. 6 figs., 3 tabs.

  12. Five-Year Review of CERCLA Response Actions at the Idaho National Laboratory

    SciTech Connect (OSTI)

    W. L. Jolley

    2007-02-01T23:59:59.000Z

    This report summarizes the documentation submitted in support of the five-year review or remedial actions implemented under the Comprehensive Environmental Response, Compensation, and Liability Act Sitewide at the Idaho National Laboratory. The report also summarizes documentation and inspections conducted at the no-further-action sites. This review covered actions conducted at 9 of the 10 waste area groups at the Idaho National Laboratory, i.e. Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 9, and 10. Waste Area Group 8 was not subject to this review, because it does not fall under the jurisdiction of the U.S. Department of Energy Idaho Operations Office. The review included past site inspections and monitoring data collected in support of the remedial actions. The remedial actions have been completed at Waste Area Groups 2, 4, 5, 6, and 9. Remedial action reports have been completed for Waste Area Groups 2 and 4, and remedial action reports are expected to be completed during 2005 for Waste Area Groups 1, 5, and 9. Remediation is ongoing at Waste Area Groups 3, 7, and 10. Remedial investigations are yet to be completed for Operable Units 3-14, 7-13/14, and 10-08. The review showed that the remedies have been constructed in accordance with the requirements of the Records of Decision and are functioning as designed. Immediate threats have been addressed, and the remedies continue to be protective. Potential short-term threats are being addressed though institutional controls. Soil cover and cap remedies are being maintained properly and inspected in accordance with the appropriate requirements. Soil removal actions and equipment or system removals have successfully achieved remedial action objectives identified in the Records of Decision. The next Sitewide five-year review is scheduled for completion by 2011.

  13. Pacific Northwest and Alaska Regional Bioenergy Program : Five Year Report, 1985-1990.

    SciTech Connect (OSTI)

    Pacific Northwest and Alaska Bioenergy Program (U.S.)

    1991-02-01T23:59:59.000Z

    This five-year report describes activities of the Pacific Northwest and Alaska Regional Bioenergy Program between 1985 and 1990. Begun in 1979, this Regional Bioenergy Program became the model for the nation's four other regional bioenergy programs in 1983. Within the time span of this report, the Pacific Northwest and Alaska Regional Bioenergy Program has undertaken a number of applied research and technology projects, and supported and guided the work of its five participating state energy programs. During this period, the Regional Bioenergy Program has brought together public- and private-sector organizations to promote the use of local biomass and municipal-waste energy resources and technologies. This report claims information on the mission, goals and accomplishments of the Regional Bioenergy Program. It describes the biomass projects conducted by the individual states of the region, and summarizes the results of the programs technical studies. Publications from both the state and regional projects are listed. The report goes on to consider future efforts of the Regional Bioenergy Program under its challenging assignment. Research activities include: forest residue estimates; Landsat biomass mapping; woody biomass plantations; industrial wood-fuel market; residential space heating with wood; materials recovery of residues; co-firing wood chips with coal; biomass fuel characterization; wood-boosted geothermal power plants; wood gasification; municipal solid wastes to energy; woodstove study; slash burning; forest depletion; and technology transfer. 9 figs., 6 tabs.

  14. Museum Associates Program For nearly twenty five years, the Williams College Museum of Art's volunteer Museum Associates

    E-Print Network [OSTI]

    Aalberts, Daniel P.

    Museum Associates Program For nearly twenty five years, the Williams College Museum of Art's volunteer Museum Associates program has provided opportunities for Williams College students to broaden their knowledge of art and art history, learn about museum education, and develop valuable public speaking

  15. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    by continuing growth of heavy industry relative to otherstructural shifts to heavy industry would increase energybut that the growth of heavy industry would be moderated

  16. Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?

    E-Print Network [OSTI]

    Lin, Jiang

    2008-01-01T23:59:59.000Z

    Agg. Ind.App &T&D Efficinecy Energy Demand Elasticity of GDPAgg. Ind.App &T&D Efficinecy Figure 14 Energy Intensity 4.1energy consumption by sector in three scenarios Historical LBNL BPS Agg. Ind.App Efficinecy

  17. FIVE-YEAR STRATEGIC PLAN 2003-2007 USDA FOREST SERVICE NORTHEAST CENTER FOR URBAN & COMMUNITY FORESTRY

    E-Print Network [OSTI]

    Schweik, Charles M.

    FORESTRY United States Department of Agriculture Forest Service Northeastern Area #12;Page 2 D R AFT BACKGROUND AND MISSION The Northeast Center for Urban and Community Forestry was estab- lished in October. The Northeast Center for Urban and Community Forestry responds to urban and community forestry information needs

  18. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2011-01-01T23:59:59.000Z

    China. Energy& Buildings 40 (12): 2121-2127. Zhou N. ,Scenarios of Commercial Building Energy Consumption inbuilding energy retrofits, and building energy control

  19. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2010-01-01T23:59:59.000Z

    China. Energy& Buildings 40 (12): 2121-2127. Zhou N. ,Scenarios of Commercial Building Energy Consumption inbuilding energy retrofits, and building energy control

  20. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    out an energy audit of 768 buildings and 59 universities,Energy audits were conducted by local energy conservation centers, ESCOs, and universities (

  1. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    coal-burning industrial boiler efficiency will increase 52 ) Heating Coal-fired boiler efficiency Cooling (water- COPfired industrial boilers: increase efficiency by 5%, save 25

  2. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2011-01-01T23:59:59.000Z

    Hao Bin. 2009. Building Energy Efficiency Evaluation andWhy is the building energy efficiency retrofit difficult?University Building Energy Efficiency Research Centre (

  3. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2010-01-01T23:59:59.000Z

    University Building Energy Efficiency Research Centre (Report on China Building Energy Efficiency. Beijing: Chinaand Practice on Building Energy Efficiency in China.

  4. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    May 6, 2009. China Building Energy Efficiency Net, 2008. AHao Bin, 2009. Building Energy Efficiency Evaluation andWhy is the building energy efficiency retrofit difficult? ,

  5. Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?

    E-Print Network [OSTI]

    Lin, Jiang

    2008-01-01T23:59:59.000Z

    Inland coastal Coal, oil and oil product, crude oil, otherCoal, oil and oil product, crude oil, other Steam, diesel,Internation al Crude oil, oil products, NG, other Gas Fuel

  6. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2010-01-01T23:59:59.000Z

    Code The building energy consumption data has been adjustedand analyzing energy consumption data; to establish threeand monitoring. Building energy consumption data and data

  7. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    are The building energy consumption data has been adjustedand analyzing energy consumption data; to establish threeStates, the actual energy consumption data could be utilized

  8. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2011-01-01T23:59:59.000Z

    2 of The building energy consumption data has been adjustedand analyzing energy consumption data; to establish threeand monitoring. Building energy consumption data and data

  9. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2010-01-01T23:59:59.000Z

    retrofit in northern area district heating Special fund forbuildings that have district heating system (Wu, 2009). Thein heating load is assumed for buildings using district

  10. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2011-01-01T23:59:59.000Z

    retrofit in northern area district heating Special fund forbuildings that have district heating system (Wu, 2009). Thein heating load is assumed for buildings using district

  11. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    documents/011Danishvoluntaryagreements.PDF ETSU, 1999.See discussion of this report in ETSU, AEA Technology, 2001.environment/ccl/pdf/etsu-analysis.pdf European Union (EU).

  12. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    the electric power, petrochemical, metallurgical, buildingferrous metal and petrochemical industries, high efficiencymade in metallurgy, petrochemical and chemical industries.

  13. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    consumption fuel shares were 36.1% coal, 21.3% crude oil,Crude oil processing kgoe/t Ethylene kgce/t Coal Comprehensive electricity consumptionconsumption) Synthetic ammonia Sodium hydroxide (ionic membrane) Sodium hydroxide (diaphragm) Soda Calcium carbide Crude oil

  14. Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?

    E-Print Network [OSTI]

    Lin, Jiang

    2008-01-01T23:59:59.000Z

    Naphtha Feed Stock Coal Heavy oil NG biomass Electricityheat Ammonia NG Fuel Oil Heavy oil Electric ity heat CoalCoke Electricit y NG Heavy oil Coal Coke Electricity Diesel

  15. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    Swedish National Energy Administration ton coal equivalenttCO 2 ) Energy Electricity * bituminous coal Costs areare needed, such as energy price reform (coal, electricity,

  16. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    calcium carbide, coking, cement, coal, plate glass, pulp andcarbide 2 Mt Coking 80 Mt Cement 250 Mt Coal mining (

  17. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2011-01-01T23:59:59.000Z

    of the inspection or energy audit are borne by the centralstatistics, performing energy audits, and certifying theMOHURD also carried out an energy audit of 768 buildings and

  18. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    2000. The Guidebook for Energy Audits, Programme Schemes andAUDIT II - Guidebook for Energy Audit Programme Developers.of the inspection or energy audit are borne by the central

  19. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2010-01-01T23:59:59.000Z

    of the inspection or energy audit are borne by the centralstatistics, performing energy audits, and certifying theMOHURD also carried out an energy audit of 768 buildings and

  20. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    coefficient LPD = lighting power density COP = coefficientGB50034-2004 LPD = lighting power density W/m 2 = watts/

  1. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    U. and Avasoo, D. , 2001. EKO-Energi Successful VoluntarySTEM), as a part of the EKO Energi Agreements, provides a

  2. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2010-01-01T23:59:59.000Z

    This Building Energy Conservation Regulation Ordinance Billhave issued energy conservation regulations or relevantN?A? Regulations Regulations on energy efficiency in civil

  3. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2011-01-01T23:59:59.000Z

    This Building Energy Conservation Regulation Ordinance Billhave issued energy conservation regulations or relevantN?A? Regulations Regulations on energy efficiency in civil

  4. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    11th FYP saving 100 Mtce during 11th FYP save 29 TWh duringMtCO 2 ) saving 100 Mtce during 11th FYP save 29 TWh duringin 2010 saving 100 Mtce during 11th FYP save 29 TWh during

  5. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2010-01-01T23:59:59.000Z

    incentives to include energy-efficient design and materials,ensure that efficient designs lead to real energy savings in

  6. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2011-01-01T23:59:59.000Z

    incentives to include energy-efficient design and materials,ensure that efficient designs lead to real energy savings in

  7. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    of coal-fired boilers, waste heat and pressure utilization,will amount to 35 Mtce. Waste Heat and Pressure Utilizationto support 136 sub-projects in waste heat and waste pressure

  8. Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?

    E-Print Network [OSTI]

    Lin, Jiang

    2008-01-01T23:59:59.000Z

    2. Recent Trends in Energy Consumption in China Between 1980trends and policy options for reducing energy consumption orenergy consumption comprises a much larger share which is also expected to be the trend

  9. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2011-01-01T23:59:59.000Z

    Other areas such as Inner Mongolia, Shandong, Henan, andof Bao Steel in Inner Mongolia, where the central and local

  10. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2011-01-01T23:59:59.000Z

    building retrofits and heat supply system reform, followedof carrying out the heat supply system reform task. Buildingbuilding retrofits and heat supply system reform, followed

  11. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    control systems, and heat supply together Expand thecan increase 30%. Heat supply efficiency of district heatingrebuild the current heat supply through scattered small

  12. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2010-01-01T23:59:59.000Z

    building retrofits and heat supply system reform, followedretrofit particularly heat supply system reform lags theof carrying out the heat supply system reform task. Building

  13. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2011-01-01T23:59:59.000Z

    retrofit in northern area district heating Special fund forbuildings that have district heating system (Wu, 2009). The

  14. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    supply efficiency of district heating is 50% more than thatloads, priority develop district heating, and then developboilers into the district heating. In 2010, popularization

  15. Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?

    E-Print Network [OSTI]

    Lin, Jiang

    2008-01-01T23:59:59.000Z

    boiler boiler stove district heating heat pump conditionerSmall cogen Stove District heating Heat pump Centralized AC

  16. Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

    E-Print Network [OSTI]

    Zhou, Nan

    2010-01-01T23:59:59.000Z

    retrofit in northern area district heating Special fund forbuildings that have district heating system (Wu, 2009). The

  17. Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan

    E-Print Network [OSTI]

    Levine, Mark D.

    2010-01-01T23:59:59.000Z

    the level defined for a passive house in Germany (see FigureMinerge Germany Standard Passive House Definition Figure 15.low energy buildings or passive houses. Passive housing is

  18. Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?

    E-Print Network [OSTI]

    Lin, Jiang

    2008-01-01T23:59:59.000Z

    E. I.. 1996. China's Energy A forecast to 2015, U.S. DOEChinas energy/GDP elasticity remains at 1 and economic growth unfolds as forecast,

  19. Taking out one billion tones of carbon: the magic of China's 11th Five-Year Plan

    E-Print Network [OSTI]

    Lin, Jiang; Zhou, Nan; Levine, Mark D.; Fridley, David

    2007-01-01T23:59:59.000Z

    E. I.. 1996. China's Energy A forecast to 2015, U.S. DOEChinas energy/GDP elasticity remains at 1 and economic growth unfolds as forecast,

  20. Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?

    E-Print Network [OSTI]

    Lin, Jiang

    2008-01-01T23:59:59.000Z

    Heat Pump Centralized AC by NG Electric water heater Gasheater gas boiler boiler stove district heating heat pump conditioner Air conditioning Lighting Cooking and waterWater heating Technologies Electric heater Gas boiler Boiler Small cogen Stove District heating Heat pump

  1. In the Proc. of the 12th ICLP, pages 167181, 1995 On Coherence Approach to Logic

    E-Print Network [OSTI]

    Yuan, Li-Yan

    prior to the revision [5]. For essentially the same purpose, Witteveen and Brewka formulate the notionIn the Proc. of the 12th ICLP, pages 167­181, 1995 On Coherence Approach to Logic Program Revision Laboratories Numazu, Shizuoka, Japan, 401­03 Abstract We present a new approach to revising extended programs

  2. Contribution to the 12th ICPP, NICE, 25-29 October 2004

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    -polarization. We here focus on the resulting anomalous magnetic field diffusion into the plasma cloud, two orders1 Contribution to the 12th ICPP, NICE, 25-29 October 2004 The penetration of plasma clouds across Experiments are reported where a collisionfree plasma cloud penetrates a magnetic barrier by self

  3. Actes INRETS n92 233 12th International Symposium "Transport and Air Pollution" / 12e

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Actes INRETS n°92 233 12th International Symposium "Transport and Air Pollution" / 12e Colloque international "Transports et pollution de l'air", Avignon, 16 -18 June / juin 2003 proceedings / actes, n°92, tome / Vol. 1, Inrets ed., Arcueil, France, 2003, p. 233-240 Les enjeux de la pollution de l'air des

  4. FEDERAL COMMUNICATIONS COMMISSION 445 12th Street, S.W., TW-A325

    E-Print Network [OSTI]

    Peha, Jon M.

    1 Before the FEDERAL COMMUNICATIONS COMMISSION 445 12th Street, S.W., TW-A325 Washington, DC 20554. Technology has changed dramatically, and policy must keep pace. I commend the Federal Communications Docket 02-135 In the Matter of Issues related to the Commission's Spectrum Policies More Market

  5. Paper submitted to 12th SolarPACES International Symposium, October 6-8, 2004, Oaxaca, Mexico

    E-Print Network [OSTI]

    Paper submitted to 12th SolarPACES International Symposium, October 6-8, 2004, Oaxaca, Mexico Solar-8, 2004, Oaxaca, Mexico have designe

  6. Five Year Outcome of 145 Patients With Ductal Carcinoma In Situ (DCIS) After Accelerated Breast Radiotherapy

    SciTech Connect (OSTI)

    Ciervide, Raquel [Department of Radiation Oncology, New York University School of Medicine, NYU Langone Medical Center, New York, New York (United States); Dhage, Shubhada; Guth, Amber; Shapiro, Richard L.; Axelrod, Deborah M.; Roses, Daniel F. [Department of Surgery, New York University School of Medicine, NYU Langone Medical Center, New York, New York (United States); Formenti, Silvia C., E-mail: silvia.formenti@nyumc.org [Department of Radiation Oncology, New York University School of Medicine, NYU Langone Medical Center, New York, New York (United States)

    2012-06-01T23:59:59.000Z

    Background: Accelerated whole-breast radiotherapy (RT) with tumor bed boost in the treatment of early invasive breast cancer has demonstrated equivalent local control and cosmesis when compared with standard RT. Its efficacy in the treatment of ductal carcinoma in situ (DCIS) remains unknown. Methods and Materials: Patients treated for DCIS with lumpectomy and negative margins were eligible for 2 consecutive hypofractionated whole-breast RT clinical trials. The first trial (New York University [NYU] 01-51) prescribed to the whole breast 42 Gy (2.8 Gy in 15 fractions) and the second trial (NYU 05-181) 40.5 Gy (2.7 Gy in 15 fractions) with an additional daily boost of 0.5 Gy to the surgical cavity. Results: Between 2002 and 2009, 145 DCIS patients accrued, 59 to the first protocol and 86 to the second trial. Median age was 56 years and 65% were postmenopausal at the time of treatment. Based on optimal sparing of normal tissue, 79% of the patients were planned and treated prone and 21% supine. At 5 years' median follow-up (60 months; range 2.6-105.5 months), 6 patients (4.1%) experienced an ipsilateral breast recurrence in all cases of DCIS histology. In 3/6 patients, recurrence occurred at the original site of DCIS and in the remaining 3 cases outside the original tumor bed. New contralateral breast cancers arose in 3 cases (1 DCIS and 2 invasive carcinomas). Cosmetic self-assessment at least 2 years after treatment is available in 125 patients: 91% reported good-to-excellent and 9% reported fair-to-poor outcomes. Conclusions: With a median follow-up of 5 years, the ipsilateral local recurrence rate is 4.1%, comparable to that reported from the NSABP (National Surgical Adjuvant Breast and Bowel Project) trials that employed 50 Gy in 25 fractions of radiotherapy for DCIS. There were no invasive recurrences. These results provide preliminary evidence that accelerated hypofractionated external beam radiotherapy is a viable option for DCIS.

  7. C.1. RESULTS FROM PREVIOUS NSF SUPPORT. The PIs of the proposed research have each received NSF support within the last five years. One PI on

    E-Print Network [OSTI]

    Hibbett, David S.

    and bootstrapping in assessing phylogenetic confidence. Molecular Biology and Evolution (in review). C.1.3 David Mc NSF support within the last five years. One PI on this project (JW Spatafora) is also a Co five years has resulted in 110 unique peer-reviewed publications and numerous presentations, and has

  8. European Working Groupe on Internal Erorion in embankment dams April 12th to 14th 2010, Granada, Spain

    E-Print Network [OSTI]

    Paris-Sud XI, Universit de

    European Working Groupe on Internal Erorion in embankment dams April 12th to 14th 2010, Granada Working Groupe on Internal Erosion in embankment dams, Granada : Spain (2010)" #12;

  9. Prone Accelerated Partial Breast Irradiation After Breast-Conserving Surgery: Five-year Results of 100 Patients

    SciTech Connect (OSTI)

    Formenti, Silvia C., E-mail: silvia.formenti@nyumc.org [Department of Radiation Oncology, New York University School of Medicine and Langone Medical Center, New York, New York (United States); Hsu, Howard; Fenton-Kerimian, Maria [Department of Radiation Oncology, New York University School of Medicine and Langone Medical Center, New York, New York (United States)] [Department of Radiation Oncology, New York University School of Medicine and Langone Medical Center, New York, New York (United States); Roses, Daniel; Guth, Amber [Department of Surgery, New York University School of Medicine and Langone Medical Center, New York, New York (United States)] [Department of Surgery, New York University School of Medicine and Langone Medical Center, New York, New York (United States); Jozsef, Gabor [Department of Radiation Oncology, New York University School of Medicine and Langone Medical Center, New York, New York (United States)] [Department of Radiation Oncology, New York University School of Medicine and Langone Medical Center, New York, New York (United States); Goldberg, Judith D. [Division of Biostastistics, Department of Environmental Medicine, New York University School of Medicine and Langone Medical Center, New York, New York (United States)] [Division of Biostastistics, Department of Environmental Medicine, New York University School of Medicine and Langone Medical Center, New York, New York (United States); DeWyngaert, J. Keith [Department of Radiation Oncology, New York University School of Medicine and Langone Medical Center, New York, New York (United States)] [Department of Radiation Oncology, New York University School of Medicine and Langone Medical Center, New York, New York (United States)

    2012-11-01T23:59:59.000Z

    Purpose: To report the 5-year results of a prospective trial of three-dimensional conformal external beam radiotherapy (3D-CRT) to deliver accelerated partial breast irradiation in the prone position. Methods and Materials: Postmenopausal patients with Stage I breast cancer with nonpalpable tumors <2 cm, negative margins and negative nodes, positive hormone receptors, and no extensive intraductal component were eligible. The trial was offered only after eligible patients had refused to undergo standard whole-breast radiotherapy. Patients were simulated and treated on a dedicated table for prone setup. 3D-CRT was delivered at a dose of 30 Gy in five 6-Gy/day fractions over 10 days with port film verification at each treatment. Rates of ipsilateral breast failure, ipsilateral nodal failure, contralateral breast failure, and distant failure were estimated using the cumulative incidence method. Rates of disease-free, overall, and cancer-specific survival were recorded. Results: One hundred patients were enrolled in this institutional review board-approved prospective trial, one with bilateral breast cancer. One patient withdrew consent after simulation, and another patient elected to interrupt radiotherapy after receiving two treatments. Ninety-eight patients were evaluable for toxicity, and, in 1 case, both breasts were treated with partial breast irradiation. Median patient age was 68 years (range, 53-88 years); in 55% of patients the tumor size was <1 cm. All patients had hormone receptor-positive cancers: 87% of patients underwent adjuvant antihormone therapy. At a median follow-up of 64 months (range, 2-125 months), there was one local recurrence (1% ipsilateral breast failure) and one contralateral breast cancer (1% contralateral breast failure). There were no deaths due to breast cancer by 5 years. Grade 3 late toxicities occurred in 2 patients (one breast edema, one transient breast pain). Cosmesis was rated good/excellent in 89% of patients with at least 36 months follow-up. Conclusions: Five-year efficacy and toxicity of 3D-CRT delivered in prone partial breast irradiation are comparable to other experiences with similar follow-up.

  10. Polycrystalline silicon This special issue of the Revue de Physique Applique forms a report on five years of research aided and'

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    a report on five years of research aided and' coordinated by the photovoltaic programme of the CNRS and acceptors, Al and oxygen). The introduction of hydrogen causes multiple effects : it increases particulary dominant compared to those of grain boundaries. Finally, it appears that the efficiency of a photovoltaic

  11. Slumping Economy Reduces Sawlog Prices In Europe And North America to Lowest Levels in Five Years, Reports The Wood Resource Quarterly

    E-Print Network [OSTI]

    Slumping Economy Reduces Sawlog Prices In Europe And North America to Lowest Levels in Five Years Europe. Finnish sawmills currently have some of the highest wood raw-material costs of all countries regular updates of the latest developments in international timber, pulp, lumber and biomass markets

  12. facebook.com/MTasmsu montana.edu/asmsu April 10th -12th 6:30 PM

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    facebook.com/MTasmsu montana.edu/asmsu April 10th - 12th 6:30 PM April 13th 12:30 PM April 10th. For more info, visit the Campus Entertainment facebook page at: facebook.com/asmsuce 04/09 - 04/15 #12;

  13. FISH & WILDLIFE COSTS < 12th ANNUAL REPORt tO thE NORthwEst GOvERNORs < PAGE 1 2012 Columbia River Basin

    E-Print Network [OSTI]

    FISH & WILDLIFE COSTS Basin Fish and Wildlife Program Costs Report 12TH AnnuAL REPORT TO THE nORTHWEST GOvERnORS #12;PAGE 2 > 12th ANNUAL REPORt tO thE NORthwEst GOvERNORs > FISH & WILDLIFE COSTS 851 S.W. SIxTH AvEnuE, Su

  14. Microsoft Word - 20130823-PR-32-13-Draft-plan-from-Federal-agencies...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    plan from Federal agencies details specific actions over next five years to benefit fish Portland, Ore. - Federal agencies and their partners outlined today specific actions...

  15. Hanford Site Development Plan

    SciTech Connect (OSTI)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01T23:59:59.000Z

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  16. Twenty-Five Years of Ecological Recovery of East Fork Poplar Creek: Review of Environmental Problems and Remedial Actions

    SciTech Connect (OSTI)

    Smith, John G [ORNL; Loar, James M [ORNL; Stewart, Arthur J [ORNL

    2011-01-01T23:59:59.000Z

    In May 1985, a National Pollutant Discharge Elimination System permit was issued for the Department of Energy s Y-12 National Security Complex (Y-12 Complex) in Oak Ridge, Tennessee, USA, allowing discharge of effluents to East Fork Poplar Creek (EFPC). The effluents ranged from large volumes of chlorinated oncethrough cooling water and cooling tower blow-down to smaller discharges of treated and untreated process wastewaters, which contained a mixture of heavy metals, organics, and nutrients, especially nitrates. As a condition of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed to meet two major objectives: demonstrate that the established effluent limitations were protecting the classified uses of EFPC, and document the ecological effects resulting from implementing a Water Pollution Control Program at the Y-12 Complex. The second objective is the primary focus of the other papers in this special series. This paper provides a history of pollution and the remedial actions that were implemented; describes the geographic setting of the study area; and characterizes the physicochemical attributes of the sampling sites, including changes in stream flow and temperature that occurred during implementation of the BMAP. Most of the actions taken under the Water Pollution Control Program were completed between 1986 and 1998, with as many as four years elapsing between some of the most significant actions. The Water Pollution Control Program included constructing nine new wastewater treatment facilities and implementation of several other pollution-reducing measures, such as a best management practices plan; area-source pollution control management; and various spill-prevention projects. Many of the major actions had readily discernable effects on the chemical and physical conditions of EFPC. As controls on effluents entering the stream were implemented, pollutant concentrations generally declined and, at least initially, the volume of water discharged from the Y-12 Complex declined. This reduction in discharge was of ecological concern and led to implementation of a flow management program for EFPC. Implementing flow management, in turn, led to substantial changes in chemical and physical conditions of the stream: stream discharge nearly doubled and stream temperatures decreased, becoming more similar to those in reference streams. While water quality clearly improved, meeting water quality standards alone does not guarantee protection of a waterbody s biological integrity. Results from studies on the ecological changes stemming from pollution-reduction actions, such as those presented in this series, also are needed to understand how best to restore or protect biological integrity and enhance ecological recovery in stream ecosystems. With a better knowledge of the ecological consequences of their decisions, environmental managers can better evaluate alternative actions and more accurately predict their effects.

  17. 12th IAEA Technical Meeting on Energetic Particles in Magnetic Confinement Systems

    SciTech Connect (OSTI)

    Berk, Herbert L.; Breizman, Boris N.

    2014-02-21T23:59:59.000Z

    The 12th IAEA Technical Meeting on Energetic Particles in Magnetic Confinement Systems took place in Austin, Texas (711 September 2011). This meeting was organized jointly with the 5th IAEA Technical Meeting on Theory of Plasma Instabilities (57 September 2011). The two meetings shared one day (7 September 2011) with presentations relevant to both groups. Some of the work reported at these meetings was then published in a special issue of Nuclear Fusion [Nucl. Fusion 52 (2012)]. Summaries of the Energetic Particle Conference presentations were given by Kazuo Toi and Boris Breizman. They respectively discussed the experimental and theoretical progress presented at the meeting. Highlights of this meeting include the tremendous progress that has been achieved in the development of diagnostics that enables the viewing of internal fluctuations and allows comparison with theoretical predictions, as demonstrated, for example, in the talks of P. Lauber and M. Osakabe. The need and development of hardened diagnostics in the severe radiation environment, such as those that will exist in ITER, was discussed in the talks of V. Kiptily and V.A. Kazakhov. In theoretical studies, much of the effort is focused on nonlinear phenomena. For example, detailed comparison of theory and experiment on D-III-D on the n = 0 geodesic mode was reported in separate papers by R. Nazikian and G. Fu. A large number of theoretical papers were presented on wave chirping including a paper by B.N. Breizman, which notes that wave chirping from a single frequency may emanate continuously once marginal stability conditions have been established. Another area of wide interest was the detailed study of alpha orbits in a burning plasma, where losses can come from symmetry breaking due to finite coil number or magnetic field imperfections introduced by diagnostic or test modules. An important area of development, covered by M.A. Hole and D.A. Spong, is concerned with the self-consistent treatment of the induced fields that accounts for toroidally asymmetric MHD response. In addition, a significant number of studies focused on understanding nonlinear behavior by means of computer simulation of energetic particle driven instability. An under-represented area of investigation was the study of electron runaway formation during major tokamak disruptions. It was noted in an overview by S. Putvinski that electron energies in the 1020 MeV range is to be expected during projected major disruptions in ITER and that reliable methods for mitigation of the runaway process needs to be developed. Significant recent work in the field of the disruption induced electron runaway, which was reported by J. Riemann, had been submitted to Physics of Plasmas [3]. Overall it is clear that reliable mitigation of electron runaway is an extremely important topic that is in need of better understanding and solutions.

  18. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    to investments in coal gas generation and distribution1991). (4) Power generation with coal gas recovered fromin the Sixth FYP, 20 coal gas power generation projects were

  19. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    plants imported advanced technologies such as high-efficiency kilns in addition to renovating existing

  20. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    and 0.4 for boiler conversion efficiency (Xu Derui,needs), efficiency standards, increasing boiler capacities,boilers and furnaces, and production of high-efficiency end-

  1. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    of crude oil and oil products; (iii) retrofitting existingof petroleum products, limit proliferation of oil usingand product mix in energy-intensive industries; converting oil-

  2. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    crude oil and oil products; (iii) retrofitting existing inefficient equipment; (iv) removing grossly inefficient equipment from service; (v) issuing energy-consumption

  3. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    relies heavily on coal as its energy source. Small-scaledominance of coal, providing 52% of energy inputs (includingrelying on coal for 52% of energy inputs (including

  4. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    energy demand. The energy consumption mix i n China'sstructure and product mix in energy-intensive industries;Table 4). The sector's mix of energy sources that year was

  5. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    in coking, sterling, ironmaking, and open hearth processes,injections for coke in ironmaking is a common practiceinjection methods i n ironmaking. Data from the Anshan Iron

  6. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    i n cement plants Installing electricity generation capacityelectricity generation was assumed to be a 6 MW power plant,electricity generation, then is considered to be the difference between actual energy consumption at the cogeneration plant

  7. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    by the Ministry of Metallurgy. (6) Coal gas recovery fromby the Ministry of Metallurgy. China's most energy-efficientNo. 1,1991. Ministry of Metallurgy (MOM), Zhongguo Gangti

  8. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    of 165 conventional vertical cement kilns were mechanized,Small cement plants use vertical kilns and generally haveof cement kilns The mechanization of conventional vertical

  9. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    projects to convert waste heat and pressure i n usefulkilns, installation of waste heat cogeneration capacity, andbricks, recovery of waste heat for drying and improvements,

  10. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    equipment, limit oil consumption (e.g. , by increasingreduced the average oil consumption by 7 kg per ton of steeloil and oil products; (iii) retrofitting existing inefficient equipment; (iv) removing grossly inefficient equipment from service; (v) issuing energy-consumption

  11. A Review of the Department of Energys Implementation of Executive Order 12898 and Recommendations for a Second Five-Year Strategic Plan

    Broader source: Energy.gov [DOE]

    At the request of the U.S Department of Energys Office of Legacy Management, the Medical University of South Carolina (MUSC) performed a historical review of the Offices implementation of...

  12. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    under which existing heat supply boilers should be convertedUtilization Boiler and Heat Supply Retrofits Processplant conventional heat supply 1600 yuan/kW 150,000 yuan/ (

  13. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    emissions recovery, and district heating projects. The mostSEC Strengthen management work in urban district heating.Expanding district heating management systems, open up new

  14. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    GOV) and energy consumption grew at annual rates of 12% and 5.6% respectively, and the average energy intensity of China's

  15. Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)

    E-Print Network [OSTI]

    Zhiping, L.

    2010-01-01T23:59:59.000Z

    capacity came from cogeneration, fuel gas emissionsof waste heat cogeneration capacity, and improvements to theof energy (e.g. , cogeneration); (ix) improving energy

  16. Microsoft Word - 20130823-PR-32-13-Draft-plan-from-Federal-agencies-details-specific-actions-over-next-five-years-to-benefit-fi

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighandSWPA / SPRA / USACE SWPAURTeC: 215362227/15/13 1 of 34PR 32-13 FOR

  17. Five-year summary and evaluation of operations and performance of the Utica aquifer and North Lake Basin Wetlands restoration project in 2004-2009.

    SciTech Connect (OSTI)

    LaFreniere, L. M. (Environmental Science Division) [Environmental Science Division

    2011-09-13T23:59:59.000Z

    This document reviews the performance of the groundwater (and wetlands) restoration program implemented by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the first five years (2004-2009) of this initiative. The report summarizes treatment system operational data and regulatory compliance monitoring results for the site during this period, together with the results of the targeted groundwater sampling and analysis for volatile organic compounds (VOCs) conducted in early 2010 (following completion of the fifth year of systems operation), to assess the initial five years of progress of the Utica remediation effort. On the basis of the 2003 groundwater sampling results, a remedial system employing 4 extraction wells (GWEX1-GWEX4), with groundwater treatment by spray irrigation and conventional air stripping, was implemented with the concurrence of the CCC/USDA and the agencies (Table 1.1). The principal components of the system are shown in Figure 1.3 and are briefly described in Section 1.2. Operation of well GWEX4 and the associated air stripper began on October 29, 2004, and routine operation of wells GWEX1-GWEX3 and the spray irrigation treatment units began on November 22, 2004.

  18. In only four or five years, the World Wide Web has changed from a static collection of HTML web pages to a dynamic engine that powers e-commerce, collaborative work, and distribution

    E-Print Network [OSTI]

    Offutt, Jeff

    Abstract In only four or five years, the World Wide Web has changed from a static collection process 1 Introduction Only a few short years ago, the World Wide Web (Web) was used to make information. Although the term "heterogeneous" is often used to describe web applications, this word is traditionally

  19. Duplicity (2009) The film opens five years before the present day, showing the Fourth of July celebration at the American consulate in

    E-Print Network [OSTI]

    Schenato, Luca

    is underfoot, and Tully makes a speech that paints them as innovators defending themselves from duplicity their plans by planting evidence of them cheating the casino. In return, Tully at Burkett & Randle thanks, Partiz was used as the bait, Bauer staged stealing the formula, and the formula never existed at all

  20. US Geothermal Energy Program Multiyear Plan, 1988-1992

    SciTech Connect (OSTI)

    None

    1988-10-01T23:59:59.000Z

    This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. This is a final report. It contains significant data on cost of power from geothermal power systems, and is of historical (history) interest in that regard. (DJE 2005)

  1. Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000

    SciTech Connect (OSTI)

    Not Available

    1994-11-01T23:59:59.000Z

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.

  2. Energy Planning - R. J. Reynolds Style

    E-Print Network [OSTI]

    Cooper, R. H., Jr.

    1983-01-01T23:59:59.000Z

    Technology Conference Volume II, Houston, TX, April 17-20, 1983 ? Development of general worldwide energy outlook planning information ? Development of an annual, five-year Energy Strategic Plan ? Technical training of plant-level energy engineers... on the corporate level which, in turn, cascade down to the lower operating company levels. The availability of uniform energy outlook information is important to providing a basis for consistent energy planning efforts throughout the corpo ration...

  3. Five-year Local Control in a Phase II Study of Hypofractionated Intensity Modulated Radiation Therapy With an Incorporated Boost for Early Stage Breast Cancer

    SciTech Connect (OSTI)

    Freedman, Gary M., E-mail: Gary.Freedman@uphs.upenn.edu [Radiation Oncology, University of Pennsylvania, Philadelphia, Pennsylvania (United States); Anderson, Penny R. [Department of Radiation Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)] [Department of Radiation Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States); Bleicher, Richard J. [Department of Surgical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)] [Department of Surgical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States); Litwin, Samuel; Li Tianyu [Department of Biostatistics, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)] [Department of Biostatistics, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States); Swaby, Ramona F. [Department of Medical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)] [Department of Medical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States); Ma, Chang-Ming Charlie; Li Jinsheng [Department of Radiation Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)] [Department of Radiation Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States); Sigurdson, Elin R. [Department of Surgical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)] [Department of Surgical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States); Watkins-Bruner, Deborah [School of Nursing, Emory University, Atlanta, Georgia (United States)] [School of Nursing, Emory University, Atlanta, Georgia (United States); Morrow, Monica [Department of Surgical Oncology, Memorial Sloan-Kettering Cancer Center, New York, New York (United States)] [Department of Surgical Oncology, Memorial Sloan-Kettering Cancer Center, New York, New York (United States); Goldstein, Lori J. [Department of Medical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)] [Department of Medical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)

    2012-11-15T23:59:59.000Z

    Purpose: Conventional radiation fractionation of 1.8-2 Gy per day for early stage breast cancer requires daily treatment for 6-7 weeks. We report the 5-year results of a phase II study of intensity modulated radiation therapy (IMRT), hypofractionation, and incorporated boost that shortened treatment time to 4 weeks. Methods and Materials: The study design was phase II with a planned accrual of 75 patients. Eligibility included patients aged {>=}18 years, Tis-T2, stage 0-II, and breast conservation. Photon IMRT and an incorporated boost was used, and the whole breast received 2.25 Gy per fraction for a total of 45 Gy, and the tumor bed received 2.8 Gy per fraction for a total of 56 Gy in 20 treatments over 4 weeks. Patients were followed every 6 months for 5 years. Results: Seventy-five patients were treated from December 2003 to November 2005. The median follow-up was 69 months. Median age was 52 years (range, 31-81). Median tumor size was 1.4 cm (range, 0.1-3.5). Eighty percent of tumors were node negative; 93% of patients had negative margins, and 7% of patients had close (>0 and <2 mm) margins; 76% of cancers were invasive ductal type: 15% were ductal carcinoma in situ, 5% were lobular, and 4% were other histology types. Twenty-nine percent of patients 29% had grade 3 carcinoma, and 20% of patients had extensive in situ carcinoma; 11% of patients received chemotherapy, 36% received endocrine therapy, 33% received both, and 20% received neither. There were 3 instances of local recurrence for a 5-year actuarial rate of 2.7%. Conclusions: This 4-week course of hypofractionated radiation with incorporated boost was associated with excellent local control, comparable to historical results of 6-7 weeks of conventional whole-breast fractionation with sequential boost.

  4. Geothermal Energy Multi-Year Program Plan, FY 1993-1997

    SciTech Connect (OSTI)

    None

    1992-03-01T23:59:59.000Z

    This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form. (DJE 2005)

  5. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15T23:59:59.000Z

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  6. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15T23:59:59.000Z

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  7. CIOSS Five Year Review CIOSS Executive Summary

    E-Print Network [OSTI]

    Kurapov, Alexander

    ; and oceanographic in situ data collection. CIOSS research also addresses the design and evaluation of future sensors projects and workshops are evaluating the capabilities of present and future wind sensors for both research and operational uses. CIOSS Fellows are also participating in the evaluation of new, high-resolution SSH sensors

  8. Seventy Five Years of Particle Accelerators

    ScienceCinema (OSTI)

    Andy Sessler

    2013-06-11T23:59:59.000Z

    Andy Sessler, Berkeley Lab director from 1973 to 1980, sheds light on the Lab's nearly eight-decade history of inventing and refining particle accelerators, which continue to illuminate the nature of the universe. His talk was presented July 26, 2006.

  9. Five Year Curriculum Vitae Kevin M. Folta

    E-Print Network [OSTI]

    Watson, Craig A.

    ,005,585. Selecting a sunn hemp cover crop genotype for weed suppression and seed production. USDA/SARE. (2008

  10. CERCLA Five-Year Review - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting the TWPSuccess Stories Siteandscience, and8 FY0LinkA Look atCEN

  11. NERSC Strategic Implementation Plan 2002-2006

    SciTech Connect (OSTI)

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01T23:59:59.000Z

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  12. Final Report for the Soboba Strategic Tribal Energy Planning Project

    SciTech Connect (OSTI)

    Miller, Kim [EPA Specialist] [EPA Specialist

    2013-09-17T23:59:59.000Z

    In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation. The Soboba Strategic Tribal Energy Plan's goal is to create a Five Year Energy Plan for the Soboba Band of Luiseno Indians in San Jacinto, California. This plan will guide the decision making process towards consistent progress leading to the Tribal goal of a 25% reduction in energy consumption in the next five years. It will additionally outline energy usage/patterns and will edentify areas the Tribe can decrease energy use and increase efficiency. The report documents activities undertaken under the grant, as well as incldues the Tribe's strategif energy plan.

  13. Oak Ridge National Laboratory institutional plan, FY 1996--FY 2001

    SciTech Connect (OSTI)

    NONE

    1995-12-01T23:59:59.000Z

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years. Included in the report are: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory strategic plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; resource projections; appendix which contains data for site and facilities, user facility, science and mathematic education and human resources; and laboratory organization chart.

  14. washingtonpost.com A Practical Plan to End Poverty

    E-Print Network [OSTI]

    washingtonpost.com A Practical Plan to End Poverty By Jeffrey D. Sachs Monday, January 17, 2005 the past five years to fight extreme poverty and disease -- and rely on the best science and technology people from the trap of extreme poverty. The cost is a mere 50 cents out of every $100 of rich

  15. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    SciTech Connect (OSTI)

    Not Available

    1991-09-01T23:59:59.000Z

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  16. Five Years: Retrospective and Prospective Hughes: Five years ago when we started this report,

    E-Print Network [OSTI]

    be entitled "Apocalypse Now." The stock markets posted their third straight year of declines, and SITAR depends on the willingness of businesses and investors to take risks. While heroic consumers have kept

  17. Strategic plan for infrastructure optimization

    SciTech Connect (OSTI)

    Donley, C.D.

    1998-05-27T23:59:59.000Z

    This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructure and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.

  18. S. Wasterlain, D. Candusso, F. Harel, X. Franois, D. Hissel. Development of test instruments and protocols for the diagnostic of fuel cell stacks. Accept dans Journal of Power Sources suite 12th

    E-Print Network [OSTI]

    Boyer, Edmond

    and protocols for the diagnostic of fuel cell stacks. Accept dans Journal of Power Sources suite 12th Ulm for the diagnostic of fuel cell stacks Sbastien Wasterlain 1,2 , Denis Candusso 1,3,* , Fabien Harel 1,3 , Daniel.jpowsour.2010.08.029 #12;2 Abstract In the area of fuel cell research, most of the experimental techniques

  19. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  20. Savannah River Site's Site Specific Plan

    SciTech Connect (OSTI)

    Not Available

    1991-08-01T23:59:59.000Z

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  1. Environmental Restoration Site-Specific Plan for the Paducah Gaseous Diffusion Plant, FY 93

    SciTech Connect (OSTI)

    Not Available

    1993-01-15T23:59:59.000Z

    This report provides an overview of the major Environmental Restoration (ER) concerns at Paducah Gaseous Diffusion Plant (PGDP). The identified solid waste management units at PGDP are listed. In the Department of Energy (DOE) Five Year Plan development process, one or more waste management units are addressed in a series of activity data sheets (ADSs) which identify planned scope, schedule, and cost objectives that are representative of the current state of planned technical development for individual or multiple sites.

  2. Alternative fuel vehicles for the state fleets: Results of the 5-year planning process

    SciTech Connect (OSTI)

    Not Available

    1993-05-01T23:59:59.000Z

    This report documents the first attempt by the Department of Energy (DOE) to work with states to prepare five-year Alternative Fuel Vehicle (AFV) acquisition plans to identify alternative fuels and vehicles that they are planning on or would like to acquire. The DOE Regional Support Offices (RSOs) met with representatives from the states in their regions and assisted in the preparation of the plans. These plans will be used in conjunction with previously gathered Federal five-year plans to encourage Original Equipment Manufacturers (OEMs) to expand the variety of AFVs produced, reduce the incremental cost of AFVs, and to encourage fuel suppliers to expand the alternative fuel infrastructure and alternative fuel availability. By identifying the needs and requirements of state fleets, DOE can begin to describe the specific nature of the future state fleets, and establish a defined market for OEMs and fuel suppliers. DOE initiated the development and collection of the state five-year plans before the signing of the Energy Policy Act, to raise the awareness of states that they will be required by law to acquire AFVs. As a result, several states that had no AFV acquisition plan when queried have developed or are in the process of developing plans. The DOE and its RSOs are still working with the states to develop and refine acquisition plans, and this report should be treated as documentation of work in progress.

  3. Management Plan Management Plan

    E-Print Network [OSTI]

    Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have communities" J. Lichatowich et al. 1998. A Conceptual Foundation for the Management of Native Salmonids

  4. Sandia National Laboratories Institutional Plan FY1994--1999

    SciTech Connect (OSTI)

    Not Available

    1993-10-01T23:59:59.000Z

    This report presents a five year plan for the laboratory. This plan takes advantage of the technical strengths of the lab and its staff to address issues of concern to the nation on a scope much broader than Sandia`s original mission, while maintaining the general integrity of the laboratory. The plan proposes initiatives in a number of technologies which overlap the needs of its customers and the strengths of its staff. They include: advanced manufacturing technology; electronics; information and computational technology; transportation energy technology and infrastructure; environmental technology; energy research and technology development; biomedical systems engineering; and post-cold war defense imperatives.

  5. Striking a Balance Between Energy and the Environment in the Columbia River Basin Regional Power Plan Touts Efficiency to Meet

    E-Print Network [OSTI]

    Striking a Balance Between Energy and the Environment in the Columbia River Basin Regional Power equivalent of the power use of a city the size of Seattle. Over time, the energy- efficiency target, to meet future demand. The plan's target for the first five years, 1,200 average megawatts, is the energy

  6. Environmental Sciences Division long-range plan (FY 1987-FY 1992)

    SciTech Connect (OSTI)

    Not Available

    1987-04-01T23:59:59.000Z

    This third long-range plan of the Environmental Sciences Division (ESD) addresses the five-year period 1987 to 1992. It is a statement of the characteristics of the Division - the scope of its disciplinary research and development (R and D) activities, its unique staff resources, and its exceptional research facilities and support services. This strategic plan addresses the long-term scientific development and programmatic foci of the Division's goals. The near-term implementation of these goals through meeting specific tactical objectives is articulated in a separate, succinct action plan, updated biennially to reflect changing programmatic priorities and key new initiatives planned. 11 refs., 5 figs., 4 tabs.

  7. Northwest public utilities, BPA top five-year energy savings...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    less than the cost of power from a new gas-fired plant. So without energy efficiency, the region would need to generate enough additional electricity to power 3.6 million Northwest...

  8. Seventy Five Years of Particle Accelerators (LBNL Summer Lecture Series)

    ScienceCinema (OSTI)

    Sessler, Andy

    2011-04-28T23:59:59.000Z

    Summer Lecture Series 2006: Andy Sessler, Berkeley Lab director from 1973 to 1980, sheds light on the Lab's nearly eight-decade history of inventing and refining particle accelerators, which continue to illuminate the nature of the universe.

  9. Outpatient radiographic exposure in the first five years of life

    SciTech Connect (OSTI)

    Fosarelli, P.D.; DeAngelis, C.

    1987-06-01T23:59:59.000Z

    Young children receive a variety of diagnostic radiographs over time. In some cases the exposure to radiation may be unwarranted because the films may yield confusing results, or may also need to be repeated because of poor technical quality. Even when the results are clearly negative, the subsequent treatment may proceed as if the film had been positive because of the child's clinical condition. The cumulative effect of such low-dose radiation on infants and children over time is unknown. The number and types of outpatient radiographs received by a cohort of poor children from a hospital-based continuity clinic during their first 5 years of life were reviewed. Also noted were the reason for obtaining the film, whether it was positive for that reason or another, whether the child had a chronic condition that prompted the use of radiograph, and the child's sex, race, and age when the film was obtained. Of the 218 children, 132 (60.6%) received 349 sets of films in their first 5 years. There was no difference in the number of films by race or sex. Chest and posttrauma bone or joint films accounted for 315 sets of films or 90.3% of the total. Overall, 25.8% of the 267 chest films were positive; this varied by age. Only 15% of the chest films were positive in the first year compared with 29 to 49% in the second through fifth years (p less than 0.001). Cough was the respiratory symptom most reliably associated with a positive chest film, both for the cohort (p less than 0.0001) and for children in the first year of life (p less than 0.01).

  10. November 20, 2009 The Orange Revolution: Five Years Since

    E-Print Network [OSTI]

    Qian, Ning

    ) and Kyrgyzstan (2005). "It is tempting to lump them all together, but these revolutions have some important in Kyrgyzstan there was some low-level violence and looting. All three revolutions took place during-building, and ended up with neither after the conflict in 2008." Kyrgyzstan also failed to democratize--the leadership

  11. Shock Therapy in Poland: Perspectives of Five Years

    E-Print Network [OSTI]

    , 1992; Mongolia, since 1991; Kyrgyzstan, 1993. In addition I have led several cross-country studies

  12. Energy Smart Industrial: five years of enormous savings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in Washougal, Wash. Through energy efficiency measures and upgrades to chillers, air compressors and lighting, Fitesa Washougal Inc. cut its energy use by about 19 percent, or 2.5...

  13. Diurnal variation of tropical precipitation using five years TRMM data

    E-Print Network [OSTI]

    Wu, Qiaoyan

    2004-11-15T23:59:59.000Z

    and advice. Thanks to Dr. Ha for the suggestions on the statistic problem encountered . Other CSRP members: Neil Smith, J. Craig Collier and Stephanie Tice also have been an incredible help to me. And last I want to thank my parents for their love and support...

  14. FIVE YEAR COMBINED BS-ENGINEERING / MS-MATERIALS PROGRAM

    E-Print Network [OSTI]

    Fabrikant, Sara Irina

    , energy, transportation, environmental control, food processing, etc. As such, knowledge of materials has@engineering.ucsb.edu Constance Callinicos Materials Dept. Graduate Office 1355A Engr II 893-4601 callinic@engineering.ucsb.edu Prof. Arthur Gossard Advisor for ECE students 1231A Engr II 893-2686 gossard@engineering.ucsb.edu Prof

  15. Life Satisfaction Over the First Five Years Following Burn Injury

    E-Print Network [OSTI]

    Hoskins, Jessica Lynne

    2012-10-19T23:59:59.000Z

    Page 1 Frequency Distribution of Demographic Characteristics ........................... 33 2 Number of Observations for Measures ...................................................... 34 3 Means, SDs, and Model Abbreviations for Self... 1 (minor) to 6 (unsurvivable). In the current sample, the majority of participants (43%) had injury ratings of moderate (n = 112, injury rating of 2), followed by injury ratings of serious (25%; n = 65; injury rating of 3). The remaining...

  16. Energy Department Announces Five Year Renewal of Funding for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the modeling and simulation tools built during its first phase to include additional nuclear reactor designs, including small modular reactors. "As President Obama made clear...

  17. Thirty-five years at Pajarito Canyon Site

    SciTech Connect (OSTI)

    Paxton, H.C.

    1981-05-01T23:59:59.000Z

    A history of the research activities performed at the Pajarito Canyon Site from 1946 to 1981 is presented. Critical assemblies described include: the Topsy assembly; Lady Godiva; Godiva 2; Jezebel; Flattop; the Honeycomb assembly for Rover studies; Kiwi-TNT; PARKA reactor; Big Ten; and Plasma Cavity Assembly.

  18. Five Years of Neutrino Physics with Super-Kamiokande

    E-Print Network [OSTI]

    M. B. Smy

    2002-06-07T23:59:59.000Z

    Using data from both solar and atmospheric neutrinos, Super-Kamiokande has provided fundamental information on neutrino flavor mixing and neutrino mass square differences.

  19. Energy Department Announces Five-Year Renewal of Funding for...

    Energy Savers [EERE]

    research breakthroughs toward the development of advanced, next-generation biofuels. "Developing the next generation of American biofuels will enhance our national...

  20. 12th Annual Wave & Tidal 2015

    Broader source: Energy.gov [DOE]

    The UK is currently the undisputed global leader in marine energy, with more wave and tidal stream devices installed than the rest of the world combined. This leading position is built on an...

  1. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    SciTech Connect (OSTI)

    none,

    2014-02-27T23:59:59.000Z

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  2. Impact of Tight Energy Markets on Industrial Energy Planning

    E-Print Network [OSTI]

    Elliott, R. N.

    2006-01-01T23:59:59.000Z

    not come as a surprise. We initially became aware of impending energy problems in the winter of 2000-2001, when limited supplies of hydro-electric power and tight natural gas combined with a cold winter to force natural gas prices to record high...IMPACT OF TIGHT ENERGY MARKETS ON INDUSTRIAL ENERGY PLANNING R. NEAL ELLIOTT, PH.D., P.E., INDUSTRIAL PROGRAM DIRECTOR, AMERICAN COUNCIL FOR AN ENERGY-EFFICIENT ECONOMY, WASHINGTON, D.C. ABSTRACT The past five years have seen growing...

  3. Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992

    SciTech Connect (OSTI)

    Not Available

    1991-08-01T23:59:59.000Z

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  4. FY 1999 annual work plan for infrastructure program WBS 6

    SciTech Connect (OSTI)

    Donley, C.D.

    1998-08-27T23:59:59.000Z

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  5. hurricane plan UNO HURRICANE PLAN

    E-Print Network [OSTI]

    Li, X. Rong

    hurricane plan #12;UNO HURRICANE PLAN TABLE OF CONTENTS INTRODUCTION....................................................................................................................................................... 1 I. HURRICANE EMERGENCY TEAMS Hurricane Emergency Implementation Team (HEIT)......................................... 2 PPoosstt

  6. Hanford Tanks Initiative quality assurance implementation plan

    SciTech Connect (OSTI)

    Huston, J.J.

    1998-06-23T23:59:59.000Z

    Hanford Tanks Initiative (HTI) Quality Assurance Implementation Plan for Nuclear Facilities defines the controls for the products and activities developed by HTI. Project Hanford Management Contract (PHMC) Quality Assurance Program Description (QAPD)(HNF-PRO599) is the document that defines the quality requirements for Nuclear Facilities. The QAPD provides direction for compliance to 10 CFR 830.120 Nuclear Safety Management, Quality Assurance Requirements. Hanford Tanks Initiative (HTI) is a five-year activity resulting from the technical and financial partnership of the US Department of Energy`s Office of Waste Management (EM-30), and Office of Science and Technology Development (EM-50). HTI will develop and demonstrate technologies and processes for characterization and retrieval of single shell tank waste. Activities and products associated with HTI consist of engineering, construction, procurement, closure, retrieval, characterization, and safety and licensing.

  7. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation. FY 1993

    SciTech Connect (OSTI)

    Not Available

    1993-01-15T23:59:59.000Z

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94.

  8. A Sandia nuclear weapon knowledge management program plan for FY 1998--2003. Volume 1: Synopsis

    SciTech Connect (OSTI)

    NONE

    1998-02-01T23:59:59.000Z

    This volume contains a synopsis and briefing charts for a five-year plan which describes a Knowledge Management Program needed to meet Sandia`s responsibility for maintaining safety, security, reliability, and operational effectiveness of the nuclear weapon stockpile. Although the knowledge and expertise required to maintain and upgrade the stockpile continues to be critical to the country`s defense, Sandia`s historical process for developing and advancing future knowledge and expertise needs to be addressed. This plan recommends implementing an aggressive Knowledge Management Program to assure retention and furtherance of Sandia`s expertise, beginning in fiscal year 1998, as an integrated approach to solving the expertise dilemma.

  9. National conference on integrated resource planning: Proceedings

    SciTech Connect (OSTI)

    Not Available

    1991-01-01T23:59:59.000Z

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  10. National conference on integrated resource planning: Proceedings

    SciTech Connect (OSTI)

    Not Available

    1991-12-31T23:59:59.000Z

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers` short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners` (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  11. Heavy Vehicle Propulsion Materials: Recent Progress and Future Plans

    SciTech Connect (OSTI)

    D. Ray Johnson; Sidney Diamond

    2001-05-14T23:59:59.000Z

    The Heavy Vehicle Propulsion Materials Program provides enabling materials technology for the U.S. DOE Office of Heavy Vehicle Technologies (OHVT). The technical agenda for the program is based on an industry assessment and the technology roadmap for the OHVT. A five-year program plan was published in 2000. Major efforts in the program are materials for diesel engine fuel systems, exhaust aftertreatment, and air handling. Additional efforts include diesel engine valve-train materials, structural components, and thermal management. Advanced materials, including high-temperature metal alloys, intermetallics, cermets, ceramics, amorphous materials, metal- and ceramic-matrix composites, and coatings, are investigated for critical engine applications. Selected technical issues and planned and ongoing projects as well as brief summaries of several technical highlights are given.

  12. BROOKHAVEN NATIONAL LABORATORY INSTITUTIONAL PLAN FY2003-2007.

    SciTech Connect (OSTI)

    NONE

    2003-06-10T23:59:59.000Z

    This document presents the vision for Brookhaven National Laboratory (BNL) for the next five years, and a roadmap for implementing that vision. Brookhaven is a multidisciplinary science-based laboratory operated for the U.S. Department of Energy (DOE), supported primarily by programs sponsored by the DOE's Office of Science. As the third-largest funding agency for science in the U.S., one of the DOE's goals is ''to advance basic research and the instruments of science that are the foundations for DOE's applied missions, a base for U.S. technology innovation, and a source of remarkable insights into our physical and biological world, and the nature of matter and energy'' (DOE Office of Science Strategic Plan, 2000 http://www.osti.gov/portfolio/science.htm). BNL shapes its vision according to this plan.

  13. Proactive Planning

    E-Print Network [OSTI]

    Wythe, Kathy

    2008-01-01T23:59:59.000Z

    tx H2O | pg. 20 Landowners and agricultural producers in the Cedar Creek watershed are working with agency representatives and gov- ernment leaders on a proactive plan to help reduce pollution flowing into Cedar Creek Reservoir. The 34...-county watershed have an opportunity to voice their opinions and help draft the watershed protection plan for the reservoir. The plan, which will outline ways to reduce pollution and improve water quality, is an outgrowth of years of water quality monitoring...

  14. Strategic Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a single BPA data repository * Data quality improvements * Improve model alignment with WECC planning data * Improve WECC base case coordination * Align the BPA data model with...

  15. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    7.1 (May 2010) 1 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition...

  16. 1997 U.S. Department of Energy Strategic Plan

    SciTech Connect (OSTI)

    None,

    1997-09-01T23:59:59.000Z

    With the end of the Cold War and the election of President Clinton, the Department of Energy (DOE) set a new course which began with the publication of its first departmental strategic plan in April 1994. Entitled ``Fueling a Competitive Economy, it provided the framework and shared vision for meeting responsibilities in energy, national security, environmental quality, and science and technology. The strategic plan was the guidepost for the formulation of the Department`s FY 1996, FY 1997, and FY 1998 budgets and was critical to the development of the Department`s Strategic Alignment Initiative, designed to save $1.7 billion over five years. This current plan, which has been significantly improved through a very close consultation process with Congress and customers stakeholders, takes DOE to the next important performance level by being more directly linked to actions and results. It defines a strategic goal for each of the Department`s four business lines and, in the spirit of the Government Performance and Results Act and the National Performance Review, identifies a fifth goal addressing corporate management. Reengineering the business practices, managing for results, being open with neighbors and stakeholders, and ensuring the safety and health of DOE workers and the public are, and will continue to be, among the highest of priorities. Over the coming years, DOE plans to achieve their strategic goals through specific identifiable strategies. Each business line has clear objectives and straightforward ways of defining whether DOE has succeeded in meeting those objectives.

  17. Energy planning and management plan

    SciTech Connect (OSTI)

    NONE

    1996-01-01T23:59:59.000Z

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

  18. Plan Your School Visit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Your School Visit For Teachers Teachers Visit the Museum We Visit You Teacher Resources Home Schoolers Plan Your School Visit invisible utility element Plan Your School Visit...

  19. Natural Resource Management Plan for Brookhaven National Laboratory

    SciTech Connect (OSTI)

    green, T.

    2011-08-15T23:59:59.000Z

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).

  20. Hanford tanks initiative plan

    SciTech Connect (OSTI)

    McKinney, K.E.

    1997-07-01T23:59:59.000Z

    Abstract: The Hanford Tanks Initiative (HTI) is a five-year project resulting from the technical and financial partnership of the U.S. Department of Energy`s Office of Waste Management (EM-30) and Office of Science and Technology Development (EM-50). The HTI project accelerates activities to gain key technical, cost performance, and regulatory information on two high-level waste tanks. The HTI will provide a basis for design and regulatory decisions affecting the remainder of the Tank Waste Remediation System`s tank waste retrieval Program.

  1. Mon Valley work plan

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTuba City, Arizona, DisposalFourth Five-Year38Report Second18295-1GWSHP 1.8

  2. QGCSC Program Friday 12th & Saturday 13th March, 2011

    E-Print Network [OSTI]

    Graham, Nick

    Tomography AM VanBerlo, AR Campbell, RE Ellis SimITK: Rapid ITK Prototyping Using the Simulink Visual Programming Environment A. W. L. Dickinson, P. Mousavi, D. G. Gobbi, and P. Abolmaesumi Managing DataIntensive Workloads in a Cloud Rizwan Mian, Patrick Martin, Wendy Powley, Andrew Brown, Mingyi Zhang Ultrasound

  3. Innostock 2012 The 12th International Conference on Energy Storage

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    market is 9% between 1996 and 2000 and only 18% of sold air conditioner are replacements for existing air) T Temperature (°C) t Time (s) v Air velocity (m.s-1 ) x Axial coordinates (m) Y Internal tube width (m) Z conductivity (W.m-1 .K-1 ) Density (kg.m-3 ) Molten fraction (-) Subscripts a Air ext Experimental room fd

  4. Tuesday 12th This bulletin is kindly sponsored by-

    E-Print Network [OSTI]

    is an opportunity to get an update on the scale of the problem in North East Scotland and its implications of Ordiequish entrance. 10:05-11:45; Tour with FCS staff examining infected SP restock and harvesting

  5. VOTER GUIDE VOTING DAYS: MARCH 12TH-16TH

    E-Print Network [OSTI]

    ELECTIONS 2012 #12;President Adenike Hamilton Jason Zavaleta Representative at Large Abel Gomez Christa Sini Representative Business Representative Sara Lord Jonathon Bloch Raeann Yurman Health & Human Services Representative Sara Padash Junior Representative Brittani Morgan Cody May Science & Engineering Representative

  6. Digital Human Symposium 2009 March 12th, 2009

    E-Print Network [OSTI]

    Terzopoulos, Demetri

    , resulting in autonomous pedestrian models, and (2) a comprehen- sive biomechanical model of the human body of the human body, its detailed biomechanical modeling has not received ad- equate attention. I will describe to synthesize autonomous movements for the behavioral animation of the human head and face. 2. Autonomous

  7. Greek Leadership Council Sexual Misconduct Policy Approved February 12th

    E-Print Network [OSTI]

    Greek Leadership Council Sexual Misconduct Policy Approved February and Dartmouth Bystander Initiative (DBI) training. The Greek Leadership Council (GLC) must approve other trainings not listed above. #12; 2.0 Leadership Training The President and a designee from each

  8. 12th international coal testing conference. Volume XII

    SciTech Connect (OSTI)

    NONE

    1996-12-31T23:59:59.000Z

    The Proceedings of the Twelfth International Coal Testing Conference are presented. The Conference was held September 8-11, 1996 in Cincinnati, Ohio. Fifteen papers were presented at the Conference. A separate abstract was prepared for each paper for inclusion in the Energy Science and Technology Database.

  9. Energy education resources: Kindergarten through 12th grade

    SciTech Connect (OSTI)

    Altman, P. [comp.

    1992-12-01T23:59:59.000Z

    This publication is the result of a study undertaken by the National Energy Information Center (NEIC), a service of the Energy Information Administration (EIA), to provide its customers with a list of generally available free or low-cost energy-related education materials for primary and secondary students and educators. The list is updated once a year.

  10. July 12th, 2011 -Assessment of current water conditions

    E-Print Network [OSTI]

    Reference ET - SLV #12;Avondale Reference ET AR Basin #12;Idalia Reference ET Eastern CO #12;Lucerne

  11. Energy education resources. Kindergarten through 12th grade

    SciTech Connect (OSTI)

    NONE

    1995-02-17T23:59:59.000Z

    This publication is the result of a study undertaken by the National Energy Information Center (NEIC), a service of the Energy Information Administration (EIA), to provide its customers with a list of generally available free or low-cost energy-related educational materials for students and educators. The list is updated once a year.

  12. California's 12th congressional district: Energy Resources | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomassSustainableCSL Gas Recovery Biomass16Association

  13. 12th Annual Bridging Partnerships Small Business Symposium | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube platform is always evolving, so are our1pmChemicalConference Call DaysEnergy

  14. Ohio's 12th congressional district: Energy Resources | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcerns JumpsourceOffshore Lubricants MarketInformation Ohio.

  15. Illinois' 12th congressional district: Energy Resources | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty, Texas:ITCSolidIdaho‎ |Idylwood,IkeInformation

  16. 12th Annual Bridging Partnerships Small Business Symposium | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of BadTHE U.S. DEPARTMENT OF ENERGY'EliseConferencePRESENTATIONS

  17. 12th Annual Turkmenistan International Oil and Gas Exhibition | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of BadTHE U.S. DEPARTMENT OF ENERGY'EliseConferencePRESENTATIONSof

  18. Pennsylvania's 12th congressional district: Energy Resources | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri:EnergyOssian,Parle

  19. New York's 12th congressional district: Energy Resources | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcerns Jump to:Neppel WindNew GridHyTepInformation New York's

  20. North Carolina's 12th congressional district: Energy Resources | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcerns Jump to:NeppelsourceNormal, Illinois:Power

  1. Michigan's 12th congressional district: Energy Resources | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant JumpMarysville, Ohio:Menomonee| Open EnergyEnergyInformation th congressional

  2. Texas's 12th congressional district: Energy Resources | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f <Maintained ByManagementInformationInformation ENTECH Energy

  3. New Jersey's 12th congressional district: Energy Resources | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: EnergyEnergyPPCR)Nevis EngineCity,NewJumpInformation Jersey.

  4. Florida's 12th congressional district: Energy Resources | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdf Jump to:ar-80m.pdfFillmore County,andJump to:Incubation

  5. Georgia's 12th congressional district: Energy Resources | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdf Jump1946865°,Park,2005) | OpenInformation Georgia's

  6. Plans, Updates, Regulatory Documents

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stewardship Environmental Protection Obeying Environmental Laws Individual Permit Documents Individual Permit: Plans, Updates, Regulatory Documents1335769200000Plans...

  7. Annual Training Plan Template

    Broader source: Energy.gov [DOE]

    The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

  8. Disability Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavidDieselDirectionsDirectorateDisability Plans

  9. Vision Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del SolStrengthening aTurbulenceUtilize AvailableMedia1.1 The History of theVision Plan

  10. Plans, Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeeding accessPeptoidLabPhysics Physics Oursources |VisitPlans,

  11. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItemResearch > TheNuclearHomelandMultivariateSiteSeparationsRelevantStrategic Plan

  12. Medical Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes |IsLove Your Home andDispositionMechanical R&DMakingMedical Plans

  13. Venus Technology Plan Venus Technology Plan

    E-Print Network [OSTI]

    Rathbun, Julie A.

    Venus Technology Plan May 2014 #12; ii Venus Technology Plan At the Venus Exploration Survey priorities, and (3) develop a Technology Plan for future Venus missions (after a Technology Forum at VEXAG Meeting 11 in November 2013). Here, we present the 2014 Venus Technology Plan

  14. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    SciTech Connect (OSTI)

    Childs, Allen

    2002-03-01T23:59:59.000Z

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  15. Survey of state regulatory activities on least cost planning for gas utilities

    SciTech Connect (OSTI)

    Goldman, C.A. (Lawrence Berkeley Lab., CA (United States) National Association of Regulatory Utility Commissioners, Washington, DC (United States)); Hopkins, M.E. (Fleming Group, Washington, DC (United States))

    1991-04-01T23:59:59.000Z

    Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. Incorporating the concept of meeting customer energy service needs entails a recognition that customers' costs must be considered along with the utility's costs in the economic analysis of energy options. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. All state commissions were surveyed to assess the current status of gas planning and demand-side management and to identify significant regulatory issues faced by commissions during the next several years. The survey was to determine the extent to which they have undertaken least-cost planning for gas utilities. The survey included the following topics: (1) status of state PUC least-cost planning regulations and practices for gas utilities; (2) type and scope ofnatural gas DSM programs in effect, includeing fuel substitution; (3) economic tests and analysis methods used to evaluate DSM programs; (4) relationship between prudence reviews of gas utility purchasing practices and integrated resource planning; and (5) key regulatory issues facing gas utilities during the next five years. 34 refs., 6 figs., 10 tabs.

  16. Department of Energy Environment, Safety and Health Management Plan. Fiscal year 1996

    SciTech Connect (OSTI)

    NONE

    1996-01-01T23:59:59.000Z

    This report describes efforts by the Department of Energy (DOE) to effectively plan for environment, safety and health activities that protect the environment, workers and the public from harm. This document, which covers fiscal year 1996, reflects planning by operating contractors and Program Offices in early 1994, updated to be consistent with the President`s FY 1996 budget submittal to Congress, and subsequent Department of Energy Program refinements. Prior to 1992, only a small number of facilities had a structured process for identifying environment, safety and health (ES and H) needs, reporting the costs (in both direct and indirect budgets) of ES and H requirements, prioritizing and allocating available resources, and efficiently communicating this information to DOE. Planned costs for ES and H activities were usually developed as an afterthought to program budgets. There was no visible, consistently applied mechanism for determining the appropriate amount of resources that should be allocated to ES and H, or for assuring that significant ES and H vulnerabilities were planned to be funded. To address this issue, the Secretary (in November 1991) directed DOE to develop a Safety and Health Five-Year Plan to serve as a line management tool to delineate DOE-wide programs to reduce and manage safety and health risks, and to establish a consistent framework for risk-based resource planning and allocation.

  17. 2030 OCARTS Plan Report

    E-Print Network [OSTI]

    Association of Central Oklahoma Governments

    ......................................Director of Planning & Program Development Pearlie Tiggs................................................................... Community Planner 2030 OCARTS Plan Report Table of Contents PART 1 INTRODUCTION........................................................................ 1 Federal Legislation.......................................................................... 1 Purpose of the Plan Report and Relationship to other Plan Documents............. 3 Organization of the Transportation Planning Process...

  18. Recommendations on Implementing the Energy Conservation Building Code in Rajasthan, India

    SciTech Connect (OSTI)

    Yu, Sha; Makela, Eric J.; Evans, Meredydd; Mathur, Jyotirmay

    2012-02-01T23:59:59.000Z

    India launched the Energy Conservation Building Code (ECBC) in 2007 and Indian Bureau of Energy Efficiency (BEE) recently indicated that it would move to mandatory implementation in the 12th Five-Year Plan. The State of Rajasthan adopted ECBC with minor modifications; the new regulation is known as the Energy Conservation Building Directives Rajasthan 2011 (ECBD-R). It became mandatory in Rajasthan on September 28, 2011. This report provides recommendations on an ECBD-R enforcement roadmap for the State of Rajasthan.

  19. Planning considerations for the intermountain HVDC transmission system

    SciTech Connect (OSTI)

    Lee, R.L.; Beshir, M.J.; Gee, J.H.

    1986-01-01T23:59:59.000Z

    Planning of an HVDC transmission system embedded into an existing ac network may require unique control and converter equipment capability in order to satisfy stability requirements of the network. The planning and design of the Intermountain Power Project HVDC transmission system are based on unique control performance features for power transfers during terminal ac faults, rapid power recovery following fault clearing and utilization of exceptionally high transient overload capability of 2 per unit during the post-fault period to maintain system stability. The Department, in its efforts to meet the Western Systems Coordinating Council's (WSCC) reliability criteria, developed and incorporated into its HVDC specifications very rigorous reliability and availability requirements. One objective of this project was to attain the unusually low bipolar converter system outage frequency goal of one outage in five years to achieve a bipole performance rating equivalent to two ac circuits of similar capability. The reliability goals of this project have provided one of the impetus for revisions to the WSCC Reliability Criteria for System Design. The reliability goals and other features adopted for the Intermountain HVDC transmission system are discussed in this paper and study results are included to demonstrate the effectiveness of various controls implemented as stability enhancement techniques.

  20. PLAN100%DIGITAL PLAN100%DIGITAL

    E-Print Network [OSTI]

    en un conjunto d e servicios digitales. RAZONES DEL PLAN: Existe un n mero importante de institu tos

  1. Review: Weldon Spring Site Remedial Action Project Second Five Year Review. Revision 0. DOE/OR/21548-891 review dated August 2001. The results of the five year review indicate that the remedies are functioning as intended in the four operable units. The operable units are Quarry Bulk Waste, Chemical Plant, Quarry Residuals, and Groundwater. Review contents include remedial actions in quarry bulk wastes, chemical plant (vicinity properties, southeast drainage, frog pond drainage, busch lakes, and site remediation), quarry residuals, environmental monitoring (radon gas monitoring, gamma radiation monitoring, radioactive air particulate monitoring, airborne asbestos monitoring, surfact water protection, and groundwater monitoring), applicable or relevant and appriopriate requirements (ARAR) for chemical plant, quarry residuals, and interim groundwater operable units. Figures include location maps, plan layouts, and charts. Tables include contaminant cleanup standards, summary data for uranium, nitroaromatic compound, and analytical, summary results for asbestos air monitoring, annual averages for monitoring locations, averages for uranium concentrations, and summary of detection monitoring data.

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTableSelling7 AugustAFRICAN3u ;;;:: A' 3 ct' RIDGEGeneral

  2. Undergraduate Mission, Vision, and Plan: Supplements 1 Mission, Vision and Plan: The Undergraduate Program

    E-Print Network [OSTI]

    in the ecological sciences, we have experienced. Faculty attrition over the last five years contributes opportunities for in-house internships and undergraduate research. Finally, our current academic environment

  3. Management Plan Supplement Yakima Subbasin Plan

    E-Print Network [OSTI]

    #12;Management Plan Supplement Yakima Subbasin Plan November 26, 2004 Prepared for the Presented's subbasin planning process is iterative and designed within an adaptive management framework. Management is comprised of elected officials from local governments throughout the subbasin, and meets regularly to work

  4. CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN

    E-Print Network [OSTI]

    Oliver, Douglas L.

    CHEMICAL HYGIENE PLAN AND HAZARD COMMUNICATION PLAN Occupational Exposures to Hazardous Chemicals Safety 2723 Environmental Health/Safety Chemical Hygiene Officer Radiation Safety Officer Biological (Accident Reports) 2204 Bioengineering 2965 #12;TABLE OF CONTENTS CHEMICAL HYGIENE PLAN (CHP) (4/2007) 1

  5. CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN

    E-Print Network [OSTI]

    Kim, Duck O.

    CHEMICAL HYGIENE PLAN AND HAZARD COMMUNICATION PLAN Occupational Exposures to Hazardous Chemicals and Safety Numbers Research Safety 2723 Environmental Health/Safety Chemical Hygiene Officer Radiation Safety Human Resources (Accident Reports) 4589 Bioengineering 2965 #12;TABLE OF CONTENTS CHEMICAL HYGIENE PLAN

  6. The Five-Year Effectiveness of the Texas First Dental Home Program

    E-Print Network [OSTI]

    McFarland, Taylor BH

    2014-08-06T23:59:59.000Z

    to pay for a preventable disease. A significant percentage of children experiencing ECC and S-ECC require dental restorative treatment under general anesthesia in the operating room (OR) due to extent of treatment needs and young age. Treatment... in the OR is financially costly with facility fees and anesthesiologist fees costing more than dentistry related fees. Recently anesthesia researchers have uncovered possible prolonged deleterious effects of multiple general anesthesia exposures. These early, frequent...

  7. Open Data, Open Source and Open Standards in chemistry: The Blue Obelisk five years on

    E-Print Network [OSTI]

    O'Boyle, Noel M; Guha, Rajarshi; Willighagen, Egon L; Adams, Samuel E; Alvarsson, Jonathan; Bradley, Jean-Claude; Filippov, Igor V; Hanson, Robert M; Hanwell, Marcus D; Hutchison, Geoffrey R; James, Craig A; Jeliazkova, Nina; Lang, Andrew SID; Langner, Karol M; Lonie, David C; Lowe, Daniel M; Pansanel, Jerome; Pavlov, Dmitry; Spjuth, Ola; Steinbeck, Christoph; Tenderholt, Adam L; Theisen, Kevin J; Murray-Rust, Peter

    2011-10-14T23:59:59.000Z

    be considered finished. After that point, the next logical step would be to start work on a standard for the SMARTS language, the extension to SMILES that specifies patterns that match chemical substructures. Open Data A considerable stumbling block... does it follow the industry consortium model. Rather it is a grassroots organisation, catalysed by an initial core of interested scientists, but with membership open to all who share one or more of the goals of the group: Open Data in Chemistry. One...

  8. Five years of tritium handling experience at the Tritium Systems Test Assembly

    SciTech Connect (OSTI)

    Carlson, R.V.

    1989-01-01T23:59:59.000Z

    The Tritium Systems Test Assembly (TSTA) at Los Alamos National Laboratory is a facility designed to develop and demonstrate, in full scale, technologies necessary for safe and efficient operation of tritium systems required for tokamak fusion reactors. TSTA currently consists of systems for evacuating reactor exhaust gas with compound cryopumps; for removing impurities from plasma exhaust gas and recovering the chemically-combined tritium; for separating the isotopes of hydrogen; for transfer pumping; or storage of hydrogen isotopes; for gas analysis; and for assuring safety by the necessary control, monitoring, and tritium removal from effluent streams. TSTA also has several small scale experiments to develop and test new equipment and processes necessary for fusion reactors. In this paper, data on component reliability, failure types and rates, and waste quantities are presented. TSTA has developed a Quality Assurance program for preparing and controlling the documentation of the procedures required for the design, purchase, and operation of the tritium systems. Operational experience under normal, abnormal, and emergency conditions is presented. One unique aspect of operations at TSTA is that the design personnel for the TSTA systems are also part of the operating personnel. This has allowed for the relatively smooth transition from design to operations. TSTA has been operated initially as a research facility. As the system is better defined, operations are proceeding toward production modes. The DOE requirements for the operation of a tritium facility like TSTA include personnel training, emergency preparedness, radiation protection, safety analysis, and preoperational appraisals. The integration of these requirements into TSTA operations is discussed. 4 refs., 3 figs., 3 tabs.

  9. Black liquor combustion validated recovery boiler modeling, five-year report

    SciTech Connect (OSTI)

    Grace, T.M.; Frederick, W.J.; Salcudean, M.; Wessel, R.A.

    1996-08-01T23:59:59.000Z

    The objective of this project was to develop a new computer model of a recovery boiler furnace using a computational fluid dynamics (CFD) code specifically tailored to the requirements for solving recovery boiler flows, and using improved submodels for black liquor combustion based on continued laboratory fundamental studies. The project originated in October 1990 and was scheduled to run for four years. At that time, there was considerable emphasis on developing accurate predictions of the physical carryover of macroscopic particles of partially burnt black liquor and smelt droplets out of the furnace, since this was seen as the main cause of boiler plugging. This placed a major emphasis on gas flow patterns within the furnace and on the mass loss rates and swelling and shrinking rates of burning black liquor drops. As work proceeded on developing the recovery boiler furnace model, it became apparent that some recovery boilers encounter serious plugging problems even when physical carryover was minimal. After the original four-year period was completed, the project was extended to address this issue. The objective of the extended project was to improve the utility of the models by including the black liquor chemistry relevant to air emissions predictions and aerosol formation, and by developing the knowledge base and computational tools to relate furnace model outputs to fouling and plugging of the convective sections of the boilers. The work done to date includes CFD model development and validation, acquisition of information on black liquor combustion fundamentals and development of improved burning models, char bed model development, and model application and simplification.

  10. An Economic Evaluation of the Hass Avocado Promotion Orders First Five Years

    E-Print Network [OSTI]

    Carman, Hoy; Li, Lan; Sexton, Richard J.

    2009-01-01T23:59:59.000Z

    An Economic Evaluation of the Hass Avocado Promotion Orders19 ii An Economic Evaluation of the Hass Avocado Promotionand R.K. Craft. An Economic Evaluation of California Avocado

  11. Inspection of Nickel Alloy Welds: Results from Five Year International Program

    SciTech Connect (OSTI)

    Prokofiev, Iouri; Cumblidge, Stephen E.; Doctor, Steven R.

    2011-06-23T23:59:59.000Z

    The U.S. Nuclear Regulatory Commission established and coordinated the international Program for the Inspection of Nickel alloy Components (PINC). The goal of PINC was to evaluate the capabilities of various nondestructive examination (NDE) techniques to detect and characterize primary water stress corrosion cracking (PWSCC) in dissimilar metal welds. Round-robin results showed that a combination of conventional and phased-array ultrasound provide the highest performance for flaw detection and depth sizing in dissimilar metal piping welds. The effective detection of flaws in bottom-mounted instrumentation penetrations by eddy current and ultrasound shows that it may be possible to reliably inspect these components in the field.

  12. An Economic Evaluation of the Hass Avocado Promotion Orders First Five Years

    E-Print Network [OSTI]

    Carman, Hoy; Li, Lan; Sexton, Richard J.

    2009-01-01T23:59:59.000Z

    Inc. , 2005. California Avocado Commission. Annualannual- reports. California Avocado Commission. BusinessPromotion Programs: The Hass Avocado Promotion and Research

  13. anisotropy probe five-year: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Summary: The Wilkinson Microwave Anisotropy Probe (WMAP) mapped the distribution of temperature and polarization over the entire sky in five microwave frequency bands. These...

  14. see page 442 Five-year Follow-up of Trial of Replication-

    E-Print Network [OSTI]

    Cai, Long

    , prostate cancer is still the second leading cause of cancer death in men in the United States in a high rate of cure (X85%) in patients with low-risk disease (Stage pT2a and Gleason score p6 and PSAp10 (AST). Although AST is effective at slowing the rate of prostate cancer growth, it is not curative

  15. California's Electricity Supply and Demand Balance Over the Next Five Years

    E-Print Network [OSTI]

    and Northwest over the past two years by about 8,000 megawatts. Natural gas prices have declined from the high the resources of the system. The Commission's 2003 Baseline Demand forecast assumes the following assumptions September October 1 CEC 2003 Baseline Demand Forecast (1-in-2 Weather)1, 2 3

  16. NATURE | Q&A Five-year delay would spell end of ITER

    E-Print Network [OSTI]

    States has high scientific and technological capability in fusion energy and has been one of the leading on Earth has long been a dream for physicists. In 2006, a team from the European Union, China, India, Japan of weight-loss Elizabeth Gibney Print #12;Related stories ITER keeps eye on prize Japan quake rocks fusion

  17. Chemoembolization With Doxorubicin-Eluting Beads for Unresectable Hepatocellular Carcinoma: Five-Year Survival Analysis

    SciTech Connect (OSTI)

    Malagari, Katerina, E-mail: kmalag@otonet.gr [University of Athens, Second Department of Radiology (Greece); Pomoni, Mary [University of Athens, Imaging and Research Unit (Greece); Moschouris, Hippocrates, E-mail: hipmosch@gmail.com [Tzanion Hospital, Department of Radiology (Greece); Bouma, Evanthia [University of Athens, Imaging and Research Unit (Greece); Koskinas, John [Ippokration Hospital, University of Athens, Department of Internal Medicine and Hepatology (Greece); Stefaniotou, Aspasia [University of Athens, Imaging and Research Unit (Greece); Marinis, Athanasios [Tzanion Hospital, Department of Surgery (Greece); Kelekis, Alexios; Alexopoulou, Efthymia [University of Athens, Second Department of Radiology (Greece); Chatziioannou, Achilles [University of Athens, First Department of Radiology (Greece); Chatzimichael, Katerina [University of Athens, Second Department of Radiology (Greece); Dourakis, Spyridon [Ippokration Hospital, University of Athens, Department of Internal Medicine and Hepatology (Greece); Kelekis, Nikolaos [University of Athens, Second Department of Radiology (Greece); Rizos, Spyros [Tzanion Hospital, Department of Surgery (Greece); Kelekis, Dimitrios [University of Athens, Imaging and Research Unit (Greece)

    2012-10-15T23:59:59.000Z

    Purpose: The purpose of this study was to report on the 5-year survival of hepatocellular carcinoma (HCC) patients treated with DC Bead loaded with doxorubicin (DEB-DOX) in a scheduled scheme in up to three treatments and thereafter on demand. Materials and Methods: 173 HCC patients not suitable for curable treatments were prospectively enrolled (mean age 70.4 {+-} 7.4 years). Child-Pugh (Child) class was A/B (102/71 [59/41 %]), Okuda stage was 0/1/2 (91/61/19 [53.2/35.7/11.1 %]), and mean lesion diameter was 7.6 {+-} 2.1 cm. Lesion morphology was one dominant {<=}5 cm (22 %), one dominant >5 cm (41.6 %), multifocal {<=}5 (26 %), and multifocal >5 (10.4 %). Results: Overall survival at 1, 2, 3, 4, and 5 years was 93.6, 83.8, 62, 41.04, and 22.5 %, with higher rates achieved in Child class A compared with Child class B patients (95, 88.2, 61.7, 45, and 29.4 % vs. 91.5, 75, 50.7, 35.2, and 12.8 %). Mean overall survival was 43.8 months (range 1.2-64.8). Cumulative survival was better for Child class A compared with Child class B patients (p = 0.029). For patients with dominant lesions {<=}5 cm 1-, 2-, 3-, 4-, and 5-year survival rates were 100, 95.2, 71.4, 66.6, and 47.6 % for Child class A and 94.1, 88.2, 58.8, 41.2, 29.4, and 23.5 % for Child class B patients. Regarding DEB-DOX treatment, multivariate analysis identified number of lesions (p = 0.033), lesion vascularity (p < 0.0001), initially achieved complete response (p < 0.0001), and objective response (p = 0.046) as significant and independent determinants of 5-year survival. Conclusion: DEB-DOX results, with high rates of 5-year survival for patients, not amenable to curative treatments. Number of lesions, lesion vascularity, and local response were significant independent determinants of 5-year survival.

  18. Five-year ALARA review of dosimetry results : 1 January 2008 through 31 December 2012.

    SciTech Connect (OSTI)

    Paulus, Luke R.

    2013-08-01T23:59:59.000Z

    A review of personnel dosimetry (external and internal) and environmental monitoring results from 1 January 2008 through 31 December 2012 performed at Sandia National Laboratories, New Mexico was conducted to demonstrate that radiation protection methods used are compliant with regulatory limits and conform with the ALARA philosophy. ALARA is the philosophical approach to radiation protection by managing and controlling radiation exposures (individual and collective) to the work force and to the general public to levels that are As Low As is Reasonably Achievable taking social, technical, economic, practical, and public policy considerations into account. ALARA is not a dose limit but a process which has the objective of attaining doses as far below applicable dose limits As Low As is Reasonably Achievable.

  19. Twenty-five years of artificial photosynthesis research at Ernest Orlando Lawrence Berkeley National Laboratory

    SciTech Connect (OSTI)

    Otvos, J.W.; Calvin, M.

    1996-02-01T23:59:59.000Z

    This report summarizes the research done on artificial photosynthesis by the Calvin Group between 1970 and 1995 when the program was terminated. It contains a compilation of the personnel involved as well as a bibliography of publications supported by the project.

  20. Program Overview Our objective is to equip 25 students over a five year period

    E-Print Network [OSTI]

    McCarthy, Maeve L.

    in Population Studies K. Renee Fister*, Christopher J. Mecklin*, Maeve L. McCarthy*, David Roach*, Terry L disturbances. · Sarah Thomason, Michael Whitby, Nicole Gerlanc, and David Roach This project involves, and David Roach) BioMath Seminar In order to further develop our collaborations, we have run

  1. A Five-Year Assessment of Corn Stover Harvest in Central Iowa, USA

    SciTech Connect (OSTI)

    Douglas L. Karlen; Stuart J. Birell; J. Richard Hess

    2011-11-01T23:59:59.000Z

    Sustainable feedstock harvest strategies are needed to ensure bioenergy production does not irreversibly degrade soil resources. The objective for this study was to document corn (Zea mays L.) grain and stover fraction yields, plant nutrient removal and replacement costs, feedstock quality, soil-test changes, and soil quality indicator response to four stover harvest strategies for continuous corn and a corn-soybean [Glycine max. (L.) Merr.] rotation. The treatments included collecting (1) all standing plant material above a stubble height of 10 cm (whole plant), (2) the upper-half by height (ear shank upward), (3) the lower-half by height (from the 10 cm stubble height to just below the earshank), or (4) no removal. Collectable biomass from Treatment 2 averaged 3.9 ({+-}0.8) Mg ha{sup -1} for continuous corn (2005 through 2009), and 4.8 ({+-}0.4) Mg ha{sup -1} for the rotated corn (2005, 2007, and 2009). Compared to harvesting only the grain, collecting stover increased the average N-P-K removal by 29, 3 and 34 kg ha{sup -1} for continuous corn and 42, 3, and 34 kg ha{sup -1} for rotated corn, respectively. Harvesting the lower-half of the corn plant (Treatment 3) required two passes, resulted in frequent plugging of the combine, and provided a feedstock with low quality for conversion to biofuel. Therefore, Treatment 3 was replaced by a 'cobs-only' harvest starting in 2009. Structural sugars glucan and xylan accounted for up to 60% of the chemical composition, while galactan, arabinan, and mannose constituted less than 5% of the harvest fractions collected from 2005 through 2008. Soil-test data from samples collected after the first harvest (2005) revealed low to very low plant-available P and K levels which reduced soybean yield in 2006 after harvesting the whole-plant in 2005. Average continuous corn yields were 21% lower than rotated yields with no significant differences due to stover harvest. Rotated corn yields in 2009 showed some significant differences, presumably because soil-test P was again in the low range. A soil quality analysis using the Soil Management Assessment Framework (SMAF) with six indicators showed that soils at the continuous corn and rotated sites were functioning at an average of 93 and 83% of their inherent potential, respectively. With good crop management practices, including routine soil-testing, adequate fertilization, maintenance of soil organic matter, sustained soil structure, and prevention of wind, water or tillage erosion, a portion of the corn stover being produced in central Iowa, USA can be harvested in a sustainable manner.

  2. Open Data, Open Source and Open Standards in chemistry: The Blue Obelisk five years on

    E-Print Network [OSTI]

    O'Boyle, Noel M; Guha, Rajarshi; Willighagen, Egon L; Adams, Samuel E; Alvarsson, Jonathan; Apodaca, Richard L; Bradley, Jean-Claude; Filippov, Igor V; Hanson, Robert M; Hanwell, Marcus D; Hutchison, Geoffrey R; James, Craig A; Jeliazkova, Nina; Lang, Andrew S I D; Langner, Karol M; Lonie, David C; Lowe, Daniel M; Pansanel, Jerome; Pavlov, Dmitry; Spjuth, Ola; Steinbeck, Christoph; Tenderholt, Adam L; Theisen, Kevin J; Murray-Rust, Peter

    2011-06-04T23:59:59.000Z

    Ideaconsult Ltd., 4.A.Kanchev str., Sofia 1000, Bulgaria 14Department of Engineering, Computer Science, Physics, and Mathematics, Oral Roberts University, 7777 S. Lewis Ave. Tulsa, OK 74171, USA 15Leiden Institute of Chemistry, Leiden University, Einsteinweg... the fundamental tenants of the scientific method for data sharing and reproducibility. The Blue Obelisk was first described in the CDK News [2] and later as a formal paper by Guha et al. [3] in 2006. Its home on the web is at http...

  3. uch has been made in the past five years of the poten-

    E-Print Network [OSTI]

    Giger, Christine

    and common output amplifiers with transistor geometries that can be easily adapted for minimal noise on the camera's printed circuit board. If the application's demands change, a designer can change to place on a CMOS image sen- sor. Their complementary transis- tors allow low-power high-gain am- plifiers

  4. Emerging photovoltaic module technologies at PVUSA: A five-year assessment

    SciTech Connect (OSTI)

    Townsend, T.

    1995-04-01T23:59:59.000Z

    The Photovoltaics for Utility Scale Applications (PVUSA) project tests two types of photovoltaic systems: new modules fielded as 20-kW Emerging Module Technology (EMT) arrays, and more mature technologies fielded as 20- to 500-kW turnkey Utility Scale (US) systems. This report summarizes experiences of the PVUSA project in operating the first six 20-kW EMT photovoltaic systems. Five systems are installed at Davis, California, and one at Kihei, Hawaii. Products selected for testing and demonstration were judged to have potential for significant technical advancement or reduction in manufacturing cost. Features leading to selection of each system and findings over the average 5 years of operation are compared in the report. Factory product qualification test experiences along with field acceptance test results are documented. Evaluation includes a broad range of performance parameters, including long-term efficiency, seasonal generation patterns, and maintenance. While some of the arrays have operated as well as any commercial system, others have fared poorly. Throughout the procurement and operation of these precommercial PV modules, PVUSA has provided feedback to vendors, critical for product improvement. The data and evaluations in this report will be of further benefit to manufacturers and provide general comparative information on a variety of technologies to researchers in utilities, government, and industry alike.

  5. Twenty-five Years of Sea Turtle Protection in Brazil: Evaluating Local Effects

    E-Print Network [OSTI]

    Pegas, Fernanda V.

    2010-01-16T23:59:59.000Z

    and Angsana Ihuru Resorts provide residents of the communities where the Resorts are located with environmental education opportunities about local sea turtle populations and marine conservation (SWOT, 2006). This process is associated with positive results... for sea turtle conservation, like the reduction of sea turtle harvesting (SWOT, 2006). Environmental education is also implemented as a conservation tool to address sea turtle mortality in fishing gear. It can enhance understanding about the threats...

  6. Right to Development and Global Governance: Old and New Challenges Twenty-Five Years On

    E-Print Network [OSTI]

    Rajagopal, Balakrishnan

    "Right to Development" (RTD) called for a fundamental transformation of global governance at its origin. This transformation would enable RTD's full realization by overcoming international barriers to greater influence for ...

  7. The Chandra High Energy Transmission Grating: Design, Fabrication, Ground Calibration and Five Years in Flight

    E-Print Network [OSTI]

    Canizares, Claude R.

    Details of the design, fabrication, and ground and flight calibration of the High Energy Transmission Grating (HETG) on the Chandra X?Ray Observatory are presented after 5 years of flight experience. Specifics include the ...

  8. Massivizing Social Games: Yesterday, Today, and the Next Five Years A. Iosup Alexandru Iosup

    E-Print Network [OSTI]

    Iosup, Alexandru

    arises in and as play, and never leaves it. Huizinga, Homo Ludens, 1938, p.178 · Science and scholarship that it is "different" from "ordinary life" Huizinga, Homo Ludens, 1938, p.28 Chess players, Lucas van Leyden, c.1508

  9. Review of Conservation Costs and Benefits: Five Years of Experience under the Northwest Power Act

    E-Print Network [OSTI]

    Sheets, E.

    as a resource and that all resources be evaluated against uniform criteria to determine the lowest cost mix of resources to meet the Northwests energy needs. Since the passage of the Act, the total regional expenditure on conservation by the federal...

  10. Lessons from five years of vegetation monitoring on the Nevada Test Site

    SciTech Connect (OSTI)

    Hunter, R.B.

    1992-10-01T23:59:59.000Z

    In 1987 the US Department of Energy funded a formal, extensive monitoring program for the flora and fauna on the Nevada Test Site. The goal was to understand and record changes with time In the distribution and abundance of the plants and animals. The need to detect changes, rather than do a one-time characterization, required careful selection of parameters and the use of permanent plots to distinguish spatial from temporal variability. Repeated measurements of the same plots revealed errors and imprecision which required changes in training and data collection techniques. Interpretation of trends after several years suggested it will be important to monitor not only changes, but causes of change, such as soil moisture and herbivory. Finally, the requirement for records to be available over long periods of time poses problems of archiving and publication. This report consists of viewgraphs presenting the findings of the study.

  11. TEXTS OF EMPOWERMENT: A FUNCTIONAL RHETORICAL ANALYSIS OF MS. MAGAZINE IN THE FIRST FIVE YEARS

    E-Print Network [OSTI]

    Partlow Lefevre, Sarah Taylor

    2009-07-21T23:59:59.000Z

    Ms. was the first mass mediated feminist magazine in the United States and has often been identified as an icon of the feminist movement. This study examines three rhetorical sites in the magazine during the first five ...

  12. Energy Department Announces Five Year Renewal of Funding for First Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 Russian NuclearandJunetrackEllen O'Kane Tauscher -TheEconomy,

  13. Energy Department Announces Five-Year Renewal of Funding for Bioenergy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 Russian NuclearandJunetrackEllen O'Kane Tauscher -TheEconomy,Research Centers |

  14. ARPA-E Celebrates Five Years of Changing What's Possible | Department...

    Energy Savers [EERE]

    to solve complex problems. Program Directors serve limited terms to ensure a constant infusion of fresh ideas and an urgency to get things done. ARPA-E also focuses on moving...

  15. A little over five years ago, I started my assignment here at Det 280

    E-Print Network [OSTI]

    you all the very best and much success in the future. I look forward to serving beside you! -- TSgt 2009 Issue 2 Inside This Issue: Words from Cadre 1 Drill Team 2 AFJROTC 3 Veteran's Day 4 Veteran's Day balancing our practices with their busy schedules. Not eve- ryone needs as little sleep as appar- ently I

  16. Five-Year ALARA Review of Dosimetry Results 1 January 2009 through 31 December 2013.

    SciTech Connect (OSTI)

    Paulus, Luke R

    2014-08-01T23:59:59.000Z

    A review of dosimetry results from 1 January 2009 through 31 December 2013 was conducted to demonstrate that radiation protection methods used are compliant with regulatory limits and conform to the ALARA philosophy. This included a review and evaluation of personnel dosimetry (external and internal) results at Sandia National Laboratories, New Mexico as well as at Sandia National Laboratories, California. Additionally, results of environmental monitoring efforts at Sandia National Laboratories, New Mexico were reviewed. ALARA is a philosophical approach to radiation protection by managing and controlling radiation exposures (individual and collective) to the work force and to the general public to levels that are As Low As is Reasonably Achievable taking social, technical, economic, practical, and public policy considerations into account. ALARA is not a dose limit but a process which has the objective of attaining doses as far below applicable dose limits As Low As is Reasonably Achievable.

  17. FIVE YEAR REVIEW - MONTICELLO RADIOACTIVELY CONTAMINATED PROPERTIES - 06/11/2007

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTableSelling7111AWell:F E ," POST RmDIAL8FISK

  18. Completion of the Five-Year Reviews for the Monticello, Utah, Radioactively

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613PortsmouthBartlesville EnergyDepartment.Attachment FY2011-40 Chapter

  19. Five Years of Building the Next Generation of Reactors | Department of

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you sure you want toworldPowerHome| Department of EnergyEnergy Years of

  20. Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO Overview OCHCO OverviewRepository | DepartmentSEA-04:DepartmentSaraCompleted; Report Now

  1. Portsmouth Site Plant Surpasses Five Years Without Lost-Time Accident |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR - T enAmount forDecontamination andBoard -

  2. Notice of LEHR CERCLA Five-Year Review | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for Renewable Energy:Nanowire Solar541,9337,2AprilBigtoDepartmentManagementNotice of LEHR

  3. ARPA-E Celebrates Five Years of Changing What's Possible | Department of

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 Russian NuclearandJune 17, 2015Energy 283-ILeadership at09 inEnergy APEI

  4. Completion of the Five-Year Reviews for the Monticello, Utah, Radioactively

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S. DepartmentEnergy This partAs theFebruary 24,of theIssueAY-12

  5. The First Five Years FY 2004-2008 | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssuesEnergy Solar Decathlon2001 PowerofUse ofManagement82TheThe First

  6. Builds in U.S. natural gas storage running above five-year average

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells, Wisconsin:Deployment ActivitiesAge Refining Air1,D O EBuilds in U.S.

  7. Five Years of Building the Next Generation of Reactors | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721EnergyEngineer Edith Clarke Five Fast Facts About

  8. Energy Department Announces Five Year Renewal of Funding for First Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:RevisedAdvisoryStandard | DepartmentDepartment ofDepartment ofFuel

  9. Energy Department Announces Five-Year Renewal of Funding for Bioenergy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:RevisedAdvisoryStandard | DepartmentDepartment ofDepartment ofFuelResearch Centers

  10. DOE - Office of Legacy Management -- Notice_LEHR_CERCLA_FiveYearReview

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTableSelling CorpNew MexicoUtah MexicanNiagara Falls>

  11. Agencies announce second site-wide five-year review of cleanup at DOE�s

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProducts (VAP) VAP7-0973 1BP-14Scripting forForcingProtect YourselfIdaho site

  12. Agencies announce third site-wide five-year review of cleanup at DOE's

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProducts (VAP) VAP7-0973 1BP-14Scripting forForcingProtect YourselfIdaho

  13. Second site-wide five-year review of cleanup at DOE�s Idaho site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's PossibleRadiationImplementingnpitcheResearchPhysicsDepartment of EnergyConfidentialcompleted;

  14. Accidental Death & Dismemberment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Death & Dismemberment Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact...

  15. Plans, Implementation, and Results

    Broader source: Energy.gov [DOE]

    About the Weatherization and Intergovernmental Programs Office (WIPO) including information on plans, implementations, and results.

  16. Climate change action plan

    E-Print Network [OSTI]

    Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

  17. Martin Marietta Energy Systems Environmental Management Plan, FY 1985-1989

    SciTech Connect (OSTI)

    Furth, W.F.; Cowser, K.E.; Jones, C.G.; Mitchell, M.E.; Perry, T.P.A.; Stair, C.L.; Stinton, L.H.

    1985-05-01T23:59:59.000Z

    This plan contains the most recent revisions (as of April 1, 1985) identifying and resolving environmental problems during the next five years at the four installations managed for DOE by Martin Marietta Energy Systems, Inc. (Energy Systems). These installations are Oak Ridge National Laboratory (ORNL), Oak Ridge Gaseous Diffusion Plant (ORGDP), Oak Ridge Y-12 Plant (Y-12), and Paducah Gaseous Diffusion Plant (PGDP). The report is not an exhaustive catalogue of environmental programs for which funds will be or have been requested. The thrust is to categorize the environmental challenges by the nature of the challenge. The challenges are identified by categories: (1) radioactive waste, (2) hazardous waste, (3) co-contaminated waste (hazardous and radioactive contaminated), (4) conventional waste, (5) monitoring, and (6) remedial actions and decommissioning.

  18. Renewing U.S. mathematics: A plan for the 1990s

    SciTech Connect (OSTI)

    NONE

    1990-12-31T23:59:59.000Z

    In 1981 a committee of the National Research Council was formed to investigate the health of the mathematical sciences in the US. Its 1984 report, Renewing US Mathematics: Critical Resource for the future found that although the field was thriving intellectually, government support had deteriorated to a dangerously low level. Moreover, the number of young people entering the mathematical sciences had decreased to a level inadequate to replenish the field. The 1984 Report recommended a plan for renewal, the National Plan for Graduate and Postdoctoral Education in the Mathematical Sciences. That plan`s essential feature was a call for funding to bring support for the mathematical sciences into balance with support for the physical sciences and engineering. The interdisciplinary committee that wrote the 1984 Report quickly realized that the low level of research support for US mathematical sciences was so severe that it threatened the vitality of the entire scientific enterprise. As requested by the National Science Foundation (NSF) and the Interagency Committee for Extramural Mathematics Programs (ICEMAP), this report updates the 1984 Report. Specifically, the charge directed the committee to (1) update that report, describing the infrastructure and support for US mathematical sciences research; (2) assess trends and progress over the intervening five years against the recommendations of the 1984 Report; (3) briefly assess the field scientifically and identify significant opportunities for research, including cross-disciplinary collaboration; and (4) make appropriate recommendations designed to ensure that US mathematical sciences research will meet national needs in coming years.

  19. Civilian radioactive waste management program plan. Revision 2

    SciTech Connect (OSTI)

    NONE

    1998-07-01T23:59:59.000Z

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  20. 65 Contingency Planning Issues CONTINGENCY PLANNING ISSUES

    E-Print Network [OSTI]

    . The plan relies on a mixed strategy response to an energy shortage. The plan uses a free market approach to local jurisdic- tions, economic considerations, revisions to the California Energy Shortage Contingency multiple jurisdictions or agencies. LOCAL GOVERNMENT ASSISTANCE PROGRAM The purpose of the Energy

  1. CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN

    E-Print Network [OSTI]

    Kim, Duck O.

    CHEMICAL HYGIENE PLAN AND HAZARD COMMUNICATION PLAN Occupational Exposures to Hazardous Chemicals and Safety Numbers Research Safety 2723 Environmental Health/Safety Chemical Hygiene Officer Radiation Safety Human Resources (Accident Reports) 4589 Clinical Engineering 2964 #12;TABLE OF CONTENTS CHEMICAL HYGIENE

  2. Climate Change Adaptation Planning

    Office of Energy Efficiency and Renewable Energy (EERE)

    This course provides an introduction to planning for climate change impacts, with examples of tribes that have been going through the adaptation planning process. The course is intended for tribal...

  3. Virginia Energy Plan (Virginia)

    Broader source: Energy.gov [DOE]

    The 2010 Virginia Energy Plan affirms the state's support for the development of renewable energy. The Plan assesses the states energy picture through an examination of the states primary energy...

  4. Sustainabiliity Sustainability Plan

    E-Print Network [OSTI]

    Heller, Barbara

    Sustainabiliity IIT Campus Sustainability Plan 20102020 Published Fall Semester 2010 www.iit.edu/campus_sustainability #12;IIT Campus Sustainability Plan 2010-2020 Fall Semester 2010 1 Section I: Background Sustainability ...................................................................................................................................................................8 IIT Academic Entities on Sustainability

  5. Hoisting & Rigging Lift Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Stanford Synchrotron Radiation Laboratory May 16, 2005 SSRL-HRLP-000-R0 Page 3 of 3 Guidelines for Generating a Rigging Sketch The lift plan required a rigging sketch or...

  6. Strategic Plan Environmental Assessment

    E-Print Network [OSTI]

    Strategic Plan Environmental Assessment 2009 Clinical Center National Institutes of Health U Institutes of Health Strategic Plan Environmental Assessment 2009 Contents Executive Summary environmental assessment to determine Clinical Center strengths, weaknesses, opportunities, and threats

  7. Alternative D and D Planning Tool - 12466

    SciTech Connect (OSTI)

    Starling, D.A.; Schubert, A.L.; Bergener, T.W. [URS - CH2M Oak Ridge LLC, P.O. Box 4699, Oak Ridge, Tennessee 37831-7293 (United States)

    2012-07-01T23:59:59.000Z

    On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began cleanup of the East Tennessee Technology Park (ETTP). UCOR's $2.2 billion contract has an initial five-year term and a four-year option period for completing the cleanup of ETTP and performing surveillance and maintenance and waste management operations at both the Oak Ridge National Laboratory and the Y-12 National Security Complex. ETTP D and D work includes disposition of large, complex, contaminated, Manhattan Project-era facilities such as the K-25 and K-27 uranium enrichment facilities. At ETTP, UCOR views the D and D process as a 'Waste Factory' with waste production lines from the point-of-generation to the point-of-disposal. Safely transforming vertically-standing buildings into horizontally-lying waste in a disposal facility is the primary cleanup objective. Whereas a factory produces widgets, D and D produces waste-lots of waste. In support of the Waste Factory view, UCOR is developing a systems planning tool to help better plan how to effect cleanup by improving waste planning, uniting waste generator with waste dis-positioner, and represent the 'waste factory' in a computer model that allows the D and D and waste management teams to better understand available disposal paths, waste uncertainties and potential consequences, driving variables, and sensitivity to changes. Any model of reality represents a compromise. Part of the Waste Factory Model's value may be in providing standardization and relative direction for assisting decision making as opposed to absolute cost or schedule answers. From that relative direction, management can commission detailed planning and estimating. Also, the model's output credibility is tied directly to its input quality. That is why, as discussed above, the Waste Factory Model's key informational component will be the standardized waste streams (e.g., Structure/Debris disposed at EMWMF) and associated standardized unit costs. The model development process generally, and the development team's collaboration, specifically, is most important. Building-in this integrity up-front, transparently, will help ensure that the model outputs are known, understood, and credible (no mysterious 'black-box' components). The Waste Factory Model is envisioned to help improve understanding of a given project's waste implications; help reveal and suggest the important few variables out of the trivial many; reveal likely process bottlenecks, and help focus risk mitigation and assumption management efforts to better manage the projected total cost. In the long term, the UCOR team's goal is to incorporate an information feedback loop to help improve the accuracy of key model attributes, such as the standardized cost information. This way, by design, the model output should improve over time and thus help the model mature into both a credible scenario tool and a standardized project planning resource. The initial model capabilities may be narrow, but with time and effort it may prove to be a timely and cost-effective tool. (authors)

  8. Science-Driven Computing: NERSC's Plan for 2006-2010

    SciTech Connect (OSTI)

    Simon, Horst D.; Kramer, William T.C.; Bailey, David H.; Banda,Michael J.; Bethel, E. Wes; Craw, James M.; Fortney, William J.; Hules,John A.; Meyer, Nancy L.; Meza, Juan C.; Ng, Esmond G.; Rippe, Lynn E.; Saphir, William C.; Verdier, Francesca; Walter, Howard A.; Yelick,Katherine A.

    2005-05-16T23:59:59.000Z

    NERSC has developed a five-year strategic plan focusing on three components: Science-Driven Systems, Science-Driven Services, and Science-Driven Analytics. (1) Science-Driven Systems: Balanced introduction of the best new technologies for complete computational systems--computing, storage, networking, visualization and analysis--coupled with the activities necessary to engage vendors in addressing the DOE computational science requirements in their future roadmaps. (2) Science-Driven Services: The entire range of support activities, from high-quality operations and user services to direct scientific support, that enable a broad range of scientists to effectively use NERSC systems in their research. NERSC will concentrate on resources needed to realize the promise of the new highly scalable architectures for scientific discovery in multidisciplinary computational science projects. (3) Science-Driven Analytics: The architectural and systems enhancements and services required to integrate NERSC's powerful computational and storage resources to provide scientists with new tools to effectively manipulate, visualize, and analyze the huge data sets derived from simulations and experiments.

  9. Greensburg Sustainable Comprehensive Plan

    High Performance Buildings Database

    Greensburg, KS In October 2007, the architectural and planning firm, BNIM, was selected formally by the City of Greensburg, with support from the USDA, to prepare the first phase of a comprehensive master plan to rebuild the city, which provides a framework for the rebuilding of Greensburg based around the principles of economic, social and environmental sustainability. The BNIM Planning team presented the final draft of Greensburg's Comprehensive Plan to the City Council and to a public hearing on January 16, 2008.

  10. Environmental Management System Plan

    E-Print Network [OSTI]

    Fox, Robert

    2009-01-01T23:59:59.000Z

    and locations chemicals are used as well as information about emergency plans and procedures. The current Hazardous

  11. Business Planning Resources

    Broader source: Energy.gov [DOE]

    Business Planning Resources, a presentation of the U.S. Department of Energy's Better Buildings Neighborhood Program.

  12. Waste Management Quality Assurance Plan

    E-Print Network [OSTI]

    Waste Management Group

    2006-01-01T23:59:59.000Z

    Revision 6 Waste Management Quality Assurance Plan Waste6 WM QA Plan Waste Management Quality Assurance Plan LBNL/4 Management Quality Assurance

  13. Corporate and Business Plan

    E-Print Network [OSTI]

    Corporate and Business Plan 2010-2011 #12;Main addresses Forest Research Alice Holt Lodge Farnham Research's Business Plan 2010-2011 ..........................12 Table Contents Table 1 - Income This Corporate and Business Plan sets out FR's aims and strategic objectives. It describes the Key Performance

  14. Multiperiod Refinery Planning Optimization

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    Multiperiod Refinery Planning Optimization with Nonlinear CDU Models Abdulrahman Alattas, Advisor #12;Refinery Planning Model Development 2 Extension to Multiperiod Planning #12;3 Multiperiod Refinery: refinery configuration Determine · What crude oil to process and in which time period? · The quantities

  15. University of Operations Plan

    E-Print Network [OSTI]

    Firestone, Jeremy

    Management Plan Office of Campus and Public Safety University of Delaware Critical Incident Management Plan Management Plan Office of Campus and Public Safety - 4 - University of Delaware Critical Incident Management and Public Safety - 5 - County of New Castle CD-30 911 Center/Communications CD-31 Department of Police CD-32

  16. University Libraries Technology Plan

    E-Print Network [OSTI]

    Moore, Paul A.

    Libraries Bowling Green State University #12;Table of Contents Introduction ..................................................................19 Page 2 of 19 Technology Plan, 2003-2005 University Libraries Bowling Green State University #12University Libraries Technology Plan 2003-2005 Page 1 of 19 Technology Plan, 2003-2005 University

  17. Lafayette Metropolitan Planning Organization 2030 Transportation Plan

    E-Print Network [OSTI]

    Lafayette Metropolitan Planning Organization

    2010-10-31T23:59:59.000Z

    of Carencro Byron Breaux City-Parish Council Designee John Broussard City-Parish President Designee Vernal Comeaux City-Parish Council Designee Bill Fontenot La Dept of Transportation and Development Lucien Gastineau City-Parish Planning Commission...

  18. Retirement Planning TimeLine MPSERS Retirement Plan Participant

    E-Print Network [OSTI]

    early in your career! Your MPSERS retirement pension is based on your best 3 years (MIP plan) or 5 years- it is never too early to plan for your retirement! Know what plan you are in - MIP or Basic. Review your1 Retirement Planning TimeLine MPSERS Retirement Plan Participant Retirement planning is essential

  19. Business Plans for Agricultural Producers

    E-Print Network [OSTI]

    McCorkle, Dean; Bevers, Stan

    2008-10-17T23:59:59.000Z

    Natural resources Z Strengths, weaknesses, opportunities ? and threats (SWOT) Mission statement ? Objectives and goals ? Production plan ? Financial plan ? Market plan ? Legal and liability issues ? Insurance ? Succession and estate planning...

  20. Multi-Year SSL Market Development Support Plan

    SciTech Connect (OSTI)

    Ledbetter, Marc R.

    2012-05-01T23:59:59.000Z

    This plan sets out a strategic, five year framework for guiding DOE's market development support activities for high-performance solid-state lighting (SSL) products for the U.S. general illumination market. The market development support activities described in this plan, which span federal fiscal years 2012 to 2016, are intended to affect the types of SSL general illumination products adopted by the market, to accelerate commercial adoption of those products, and to support appropriate application of those products to maximize energy savings. DOE has established aggressive FY16 goals for these activities, including goals for the types of products brought to market, the market adoption of those products, and the energy savings achieved through use of SSL products. These goals are for the combined effect of DOE's SSL market development support and R and D investment, as well as the leveraged activities of its partners. Goals include: (1) inducing the market introduction of SSL products achieving 140 lumens per Watt (lm/W) for warm white products, and 155 lm/W for cool white products, and (2) inducing sales of high-performance SSL products that achieve annual site electricity savings of 21 terawatt hours (0.25 quadrillion Btus primary energy) by FY16. To overcome identified market barriers and to achieve the above five year goals, DOE proposes to carry out the following strategy. DOE will implement a multi-year program to accelerate adoption of good quality, high performance SSL products that achieve significant energy savings and maintain or improve lighting quality. Relying on lessons learned from past emerging technology introductions, such as compact fluorescent lamps, and using newly developed market research, DOE will design its efforts to minimize the likelihood that the SSL market will repeat mistakes that greatly delayed market adoption of earlier emerging technology market introductions. To achieve the maximum effect per dollar invested, DOE will work closely with lighting industry organizations 'such as the Next Generation Lighting Industry Alliance, North American Illuminating Engineering Society, and the International Association of Lighting Designers' and with other government programs seeking to improve lighting energy efficiency. While DOE will work closely with these organizations and others from lighting and electric utility industry, the program will focus primarily on assisting buyers of SSL products and others acting on their behalf because satisfied buyers are essential to the success of SSL market adoption. The work product of DOE's efforts will primarily be information, of the right type, at the right time, and provided efficiently to those who can best use it. A secondary work product of DOE's program will be market opportunities, in which DOE will seek to reduce the risks and costs for manufacturers of SSL products to sell good quality, high performance products to motivated buyers. In short, DOE plans to implement a multi-year program that produces highly useful and widely available information for buyers and their agents, while producing important market opportunities for producers, avoids the mistakes of the past, and is closely coordinated with industry and government. The market needs and the overall strategy were used for deciding which types of programs and projects DOE should create, and what general form they should take. Progress toward achieving plan goals with the above program elements will be monitored and periodically reported.

  1. Supporting Intelligent and Trustworthy Maritime Path Planning Decisions

    E-Print Network [OSTI]

    Cummings, M.L.

    2010-01-01T23:59:59.000Z

    The risk of maritime collisions and groundings has dramatically increased in the past five years despite technological advancements such as GPS-based navigation tools and electronic charts which may add to, instead of ...

  2. Bioenergy Technologies Office Multi-Year Program Plan: March...

    Energy Savers [EERE]

    over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as...

  3. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    SciTech Connect (OSTI)

    Childs, Allen B.

    2002-03-01T23:59:59.000Z

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.

  4. IDC Integrated Master Plan.

    SciTech Connect (OSTI)

    Clifford, David J.; Harris, James M.

    2014-12-01T23:59:59.000Z

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  5. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Permittees and the public are documented during the Hazardous Waste Facility Permit Community Relations Plan development. Contact Environmental Communication & Public...

  6. MITG Test Plan

    SciTech Connect (OSTI)

    Eck, Marshall B.

    1981-08-01T23:59:59.000Z

    The plan presented is for the testing of a prototypical slice of the Modular Isotopic Thermoelectric Generator (MITG). Cross Reference T48-1.

  7. Planning and Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rates Planning Ten-Year Capital Program Projects Lovell-Yellowtail Transmission Line Rebuild project Studies WACM Wind production summary overview (Oct. 2006)...

  8. Climate Action Plan (Virginia)

    Broader source: Energy.gov [DOE]

    Governor Timothy M. Kaine established the Governor's Commission on Climate Change in December 2007. The commission prepared a plan for Virginia that identified ways to reduce greenhouse gas...

  9. State Energy Strategic Planning

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

  10. Navajo Marketing Plan Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    River Basin Project Act General Power Contract Provisions (GCPC) - 090107 Hoover Power Plant Act of 1984 Navajo Marketing Plan Area Map Navajo Sales Enabling Agreement FINAL -...

  11. Environmental Protection Implementation Plan

    SciTech Connect (OSTI)

    Brekke, D.D.

    1995-11-01T23:59:59.000Z

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

  12. Strategic Health Workforce Planning

    E-Print Network [OSTI]

    2013-05-11T23:59:59.000Z

    May 11, 2013 ... linked to long-term workforce management plans of doctors, nurses and .... survey [53] particularly highlight the need to research long-term...

  13. Individual Development Plan

    Broader source: Energy.gov [DOE]

    To be effective, training decisions made at the organizational and departmental levels must be informed by the needs of the individual. An individual development plan (IDP) is cooperatively...

  14. Implementing Motor Decision Plans

    E-Print Network [OSTI]

    Elliott, R. N.

    The first step to reducing energy costs and increasing reliability in motors is to establish a motor plan. A motor plan allows decisions to be made in advance of motor failure, and increases the options available. By contrast, most motor decisions...

  15. Environmental protection Implementation Plan

    SciTech Connect (OSTI)

    R. C. Holland

    1999-12-01T23:59:59.000Z

    This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

  16. Supporting Document Strategic Plan

    E-Print Network [OSTI]

    Auckland, University of

    1 Supporting Document Strategic Plan 20132020 #12;2 Supporting Document Strategic Plan 2013 more critical to the University's future than was the case in 2005. The purpose of this document are summarised via a SWOT analysis in Appendix 1. This document should therefore be read in conjunction

  17. Transportation Institutional Plan

    SciTech Connect (OSTI)

    Not Available

    1986-08-01T23:59:59.000Z

    This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.

  18. The Sellafield Plan - 12458

    SciTech Connect (OSTI)

    Irving, Iain [Stakeholder Relations Director, Sellafield Ltd, Cumbria (United Kingdom)

    2012-07-01T23:59:59.000Z

    The Sellafield Performance Plan represents the start of a new era for the Sellafield site. It is a key driver in the Nuclear Management Partners mission to make Sellafield safer, cleaner, more productive, more cost effective and a better neighbour. When published in summer 2011, the Sellafield Performance Plan set out exactly what work would be completed at Sellafield between 2010/11 and 2025/26, how all of the facilities on the site interact, and what new facilities would be needed in order to deliver the risk and hazard reduction mission. The plan is the first credible and underpinned lifetime plan for the Sellafield site - the most complex part of the UK's civil nuclear estate. Under the Sellafield Performance Plan there are projected to be more jobs longer creating opportunities for the site, its workforce and the economic stability of West Cumbria. The Sellafield Ltd performance plan sets out how NMP will apply their global experience to improve operations, generate efficiencies and deliver detailed programmes of work with the aim of accelerating decommissioning and providing value for money. Successful delivery of the plan will also ensure the site continues to effectively operate critical national infrastructure that supports the UK's energy programme, and maintains the safe and secure management and storage of nuclear materials. The NDA and UK Government have demonstrated their confidence in NMP and Sellafield Ltd's capability to deliver this plan by providing the highest-ever Annual Site Funding Limit for the site in 2011/12. The Sellafield Performance Plan also creates both the foundation and the environment for a vibrant West Cumbrian economy through significant opportunities for the local supply chain and real prospects for further inward investment. By working flexibly and accelerating the decommissioning programme, the plan provides the opportunity for significant retraining to adapt to future challenges on the site and for other potential new nuclear missions in West Cumbria. (authors)

  19. Wyss Institute Chemical Hygiene Plan CHEMICAL HYGIENE PLAN

    E-Print Network [OSTI]

    Napp, Nils

    Wyss Institute Chemical Hygiene Plan CHEMICAL HYGIENE PLAN The Wyss Institute for Biologically Inspired Engineering June 2014 #12;Wyss Institute Chemical Hygiene Plan TABLE OF CONTENTS 1.0 POLICY.......................................................................................... 2 2.1 CHEMICAL HYGIENE OFFICER

  20. DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan

    E-Print Network [OSTI]

    DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan DRAFT May 25 2004 Group 5. FIFTEENMILE SUBBASIN MANAGEMENT PLAN............................................... 38 5.5.2. Consistency with the Clean Water Act, Total Maximum Daily Loads and Existing Water Quality

  1. BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN

    E-Print Network [OSTI]

    Florida, University of

    BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A R RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDIN T PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEM

  2. Public affairs plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies.

  3. Texas Tech University Hygiene Plan

    E-Print Network [OSTI]

    Rock, Chris

    Texas Tech University Chemical Hygiene Plan (Laboratory Safety Manual) January 2013 #12;TABLE C Chemical Hygiene Checklist #12;TEXAS TECH UNIVERSITY CHEMICAL HYGIENE PLAN January 2013 1 PURPOSE OF THIS PLAN It is the desire

  4. PREVIOUS GEOSCIENCES INTERNSHIP EXPERIENCES CITY PLANNING

    E-Print Network [OSTI]

    Kurapov, Alexander

    PREVIOUS GEOSCIENCES INTERNSHIP EXPERIENCES CITY PLANNING TRANSPORTATION PLANNING LAND USE (HIGHER EDUCATION) LAND USE PLANNING INTERNSHIPS CH2M-HILL PLANNING AND ENGINEERING CITY OF ANAHEIM

  5. Community Energy Stategic Planning Resources

    Broader source: Energy.gov (indexed) [DOE]

    Community Energy Strategic Planning Resources Technical Assistance Program January 24 th , 2013 2 Agenda 1. Welcome & overview 2. What is a community energy strategic plan and why...

  6. Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

    1993-07-01T23:59:59.000Z

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  7. Constraints and AI Planning

    E-Print Network [OSTI]

    Nareyek, A; Freuder, E C; Fourer, R; Giunchiglia, R P; Kautz, H; Rintanen, J; Tate, Austin

    2005-01-01T23:59:59.000Z

    Tackling real-world problems often requires to take various types of constraints into account. Such constraint types range from simple numerical comparators to complex resources. This article describes how planning techniques ...

  8. Conservation Plan Issues

    E-Print Network [OSTI]

    : Capacity Base Plan - Least Cost January Sustained Peak Reserve 0% 10% 20% 30% 40% 50% 60% 2010 2011 2012 Sustained Peak Reserve 0% 10% 20% 30% 40% 50% 60% 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

  9. Planning a Prescribed Burn

    E-Print Network [OSTI]

    Hanselka, C. Wayne

    2009-04-01T23:59:59.000Z

    This leaflet explains how to plan for adequate fuel for a prescribed burn, control the fire, notify the proper authority, manage the burn itself, and conduct follow-up management. A ranch checklist for prescribed burning is included....

  10. Technical Planning Basis

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-07-11T23:59:59.000Z

    The Guide assists DOE/NNSA field elements and operating contractors in identifying and analyzing hazards at facilities and sites to provide the technical planning basis for emergency management programs. Cancels DOE G 151.1-1, Volume 2.

  11. Developing a Marketing Plan

    E-Print Network [OSTI]

    Bevers, Stan; Waller, Mark L.; Amosson, Stephen H.; McCorkle, Dean

    2009-03-02T23:59:59.000Z

    Developing a good marketing plan will help you identify and quantify costs, set price goals, determine potential price outlook, examine production and price risk, and develop a strategy for marketing your crop. This publication describes...

  12. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Holland, R. C.

    1998-06-01T23:59:59.000Z

    This Quality Assurance Project Plan documents the quality assurance activities for the Wastewater/Stormwater/Groundwater and Environmental Surveillance Programs. This QAPP was prepared in accordance with DOE guidance on compliance with 10CFR830.120.

  13. Hygiene Plan ENVIRONMENTAL

    E-Print Network [OSTI]

    Firestone, Jeremy

    Chemical Hygiene Plan ENVIRONMENTAL HEALTH & SAFETY #12;University Of Delaware Chemical Hygiene/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10106 National Research Council Recommendations Concerning Chemical Hygiene in Laboratories (Non

  14. Developing a Marketing Plan

    E-Print Network [OSTI]

    Bevers, Stan; Waller, Mark L.; Amosson, Stephen H.; McCorkle, Dean

    2009-03-02T23:59:59.000Z

    Developing a good marketing plan will help you identify and quantify costs, set price goals, determine potential price outlook, examine production and price risk, and develop a strategy for marketing your crop. This publication describes...

  15. AWARD FEE PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AWARD FEE PLAN FOR LAT A Environmental Services of Kentucky, LLC Paducah Remediation Contract DE-AC30-10CC40020 CONCUR: Rob Seifert, Paducah Re e iation Engineer and Deputy...

  16. Metropolitan Transportation Plan 2035

    E-Print Network [OSTI]

    Tyler Area Metropolitan Planning Organization

    2009-12-04T23:59:59.000Z

    Adopted by the Tyler Area MPO Policy Committee December 4, 2009 METROPOLITAN TRANSPORTATION PLAN 2035 Revised April 22, 2010 Adopted by the Tyler Area MPO Policy Committee December 4, 2009 Amended/Revised April 22, 2010 Prepared by: Bucher..., Willis, and Ratliff Corporation 1828 East Southeast Loop 323, Suite 202 Tyler, Texas 75701 903.581.7844 This Document Serves as an Update to the Tyler Area Metropolitan Transportation Plan 2030. Portions of that Document were Unchanged and Appear...

  17. LCLS Undulator Fiducialization Plan

    SciTech Connect (OSTI)

    Wolf, Zachary

    2010-11-24T23:59:59.000Z

    This note presents the LCLS undulator fiducialization plan. The undulators will be fiducialized in the Magnetic Measurement Facility at SLAC. The note begins by summarizing the requirements for the fiducialization. A brief discussion of the measurement equipment is presented, followed by the methods used to perform the fiducialization and check the results. This is followed by the detailed fiducialization plan in which each step is enumerated. Finally, the measurement results and data storage format are presented.

  18. Environmental implementation plan

    SciTech Connect (OSTI)

    Peterson, G.L.

    1994-10-04T23:59:59.000Z

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  19. Public affairs plan

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the fiscal year (FY) 1996 UMTRA Project public affairs program and to identify specific activities to be conducted during the year. It describes the roles of various agencies involved in the public affairs program and defines the functions of the UMTRA Project Technical Assistance Contractor (TAC) Public Affairs Department. It replaces the FY 1995 Public Affairs Plan (DOE/AL/62350-154). The plan also describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about UMTRA Project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in UMTRA Project decision-making processes. The plan applies to the UMTRA Project Team; the DOE Grand Junction Projects Office (GJPO); the DOE Albuquerque Operations Office, Office of Public Affairs (OPA); the TAC; the UMTRA Project Remedial Action Contractor (RAC); and other cooperating agencies.

  20. Part I: Overall Plan 2008 Cornell Master Plan

    E-Print Network [OSTI]

    Chen, Tsuhan

    Plan 79 Primary Open Space Network Plan 83 Movement Plan 149 Development Opportunity Sites and Areas master plan 176 5 ImplementationLand Use 4.11 Concentrate academic buildings in Core Campus 59 4.12 Create a second academic hub in the core 62 4.13 Protect outdoor teaching and research facilities 64 4

  1. Rulison Monitoring Plan

    SciTech Connect (OSTI)

    None

    2010-07-01T23:59:59.000Z

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile radionuclides created by the test are unlikely to migrate appreciable distances (hundreds of feet) from the detonation zone (Cooper et al. 2007, 2009). The Monitoring Plan was developed to provide a cautious and comprehensive approach for detecting any potential contaminant migration from the Rulison test site. It also provides an independent confirmation of results from the industry sampling and analysis plan while effectively increasing the sampling frequency of wells near the site.

  2. Forestry Commission England Corporate Plan

    E-Print Network [OSTI]

    Forestry Commission England Corporate Plan 2011-15 This is the Corporate Plan for the Forestry Commission in England. It is one of a suite of plans including those for Forestry Commission (GB) and Forest Research. Page 1Forestry Commission England Corporate Plan 2011-15 #12;Page 2Forestry Commission England

  3. Integrated Planning: Consolidating Annual Facility Planning - More Time for Execution

    SciTech Connect (OSTI)

    Nelson, J. G.; R., L. Morton; Ramirez, C.; Morris, P. S.; McSwain, J. T.

    2011-02-02T23:59:59.000Z

    Previously, annual planning for Readiness in Technical Base and Facilities (RTBF) at the Nevada National Security Site (NNSS) was fragmented, disconnected, circular, and occurred constantly throughout the fiscal year (FY) comprising 9 of the 12 months, reducing the focus on implementation and execution. This required constant looking back instead of looking forward. In FY 2009, annual planning was consolidated into one comprehensive integrated plan (IP) for each facility/project, which comprised annual task planning/outyear budgeting, AMPs, and investment planning (i.e., TYIP). In FY 2010, the Risk Management Plans were added to the IPs. The integrated planning process achieved the following: 1) Eliminated fragmented, circular, planning and moved the plan to be more forward-looking; 2) Achieved a 90% reduction in schedule planning timeframe from 40 weeks (9 months) to 6 weeks; 3) Achieved an 80% reduction in cost from just under $1.0M to just over $200K, for a cost savings of nearly $800K (reduced combined effort from over 200 person-weeks to less than 40); 4) Reduced the number of plans generated from 21 plans (1 per facility per plan) per year to 8 plans per year (1 per facility plus 1 program-level IP); 5) Eliminated redundancy in common content between plans and improved consistency and overall quality; 6) Reduced the preparation time and cost of the FY 2010 SEP by 50% due to information provided in the IP; 7) Met the requirements for annual task planning, annual maintenance planning, ten-year investment planning, and risk management plans.

  4. Optimal Model-Based Production Planning

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    1 Optimal Model-Based Production Planning for Refinery Operation Abdulrahman Alattas Advisor;2 Outline Introduction Problem Statement Refinery Planning Model Development LP Planning Models NLP Planning Models Conclusion #12;3 Introduction Refinery production planning models Optimizing refinery

  5. Energy Organizational Planning

    SciTech Connect (OSTI)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17T23:59:59.000Z

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

  6. Guam Strategic Energy Plan

    SciTech Connect (OSTI)

    Conrad, M. D.

    2013-07-01T23:59:59.000Z

    Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

  7. Performance expectation plan

    SciTech Connect (OSTI)

    Ray, P.E.

    1998-09-04T23:59:59.000Z

    This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.

  8. Strategic Planning for Landowners

    E-Print Network [OSTI]

    Johnson, Jason; Polk, Wade

    2008-09-16T23:59:59.000Z

    Strategic Planning for Landowners Risk Management E-146 RM3-12.0 09-08 *Assistant Professor and Extension Economist?Management, and Extension Specialist?Risk Management, The Texas A&M System Strategic planning is a process that provides direction... the bottom up. Managers are also responsible for Jason L. Johnson and Wade Polk* 2 carrying out those required daily tasks. Land- owners are often both manager and employee, which demands a combination of vision and technical aptitude. Steps for Setting...

  9. Environmental protection implementation plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1998-03-01T23:59:59.000Z

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

  10. Enhanced radiological work planning

    SciTech Connect (OSTI)

    DECKER, W.A.

    1999-05-21T23:59:59.000Z

    The purpose of this standard is to provide Project Hanford Management Contractors (PHMC) with guidance for ensuring radiological considerations are adequately addressed throughout the work planning process. Incorporating radiological controls in the planning process is a requirement of the Hanford Site Radiological Control Manual (HSRCM-I), Chapter 3, Part 1. This standard is applicable to all PHMC contractors and subcontractors. The essential elements of this standard will be incorporated into the appropriate site level work control standard upon implementation of the anticipated revision of the PHMC Administration and Procedure System.

  11. Plutonium Vulnerability Management Plan

    SciTech Connect (OSTI)

    NONE

    1995-03-01T23:59:59.000Z

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  12. Human Capital Management Plan Fiscal Years 2003- 2010

    SciTech Connect (OSTI)

    none,

    2000-03-09T23:59:59.000Z

    Western, like many other Federal agencies, will face significant and challenging human capital issues in the next decade. The Federal workforce is aging; baby boomers, with their valuable skills and experience, are drawing nearer to retirement and new employees joining the Federal workforce today have different career expectations from the generation that preceded them. The average age of Westerns workforce is approaching 48. Almost a third of the workforce is between 50 and 54 years and most will be eligible to retire in five years. Western has almost twice as many employees who are 55 and older as it has who are 35 and younger. As the workforce ages, the proportion of younger workers is shrinking. The U.S. Census Bureau says you can expect these developments for the next 20 years. The 45 to 65 year-old work group will grow by 54 percent but the 18 to 44 population will rise by only 4 percent. According to the Bureau of Labor Statistics workers age 25 to 44 will decline by 3 million, dropping from 51 percent of the labor force in 1998 to 44 percent in 2008. Western employees who will retire include highly skilled workers in fields such as information technology, engineering, and craft occupations. Deregulation of the electric utility industry and the establishment of regional transmission organizations and independent system operators are also demanding new and different skill mixes than those currently available in Western. Changes in workforce demographic, in the education and skills that will be required in the future, and an increasingly competitive job market, will require flexible and responsive human capital tools to attract and retain talented employees. These trends were the reason for a comprehensive review of Westerns human capital programs to determine its readiness for the future. In July 2001, a team of managers conducted a comprehensive assessment of Westerns human capital needs. The team used the assessment to draft a framework that addresses the most critical human capital challenges in Western. Comments on the draft plan were then solicited from Westerns EEO committees and managers and supervisors. The framework outlines seven initiatives for implementation: 1) Develop a human capital plan linked to Westerns strategic goals. 2) Develop and implement a Westernwide workforce planning program. 3) Establish a succession planning program. 4) Create and foster a workplace environment that will attract and retain talented employees. 5) Establish a Western-wide recruitment program. 6) Develop a training program on human capital management for managers and supervisors. 7) Develop pay options for improving the link between pay and performance. Our goal in developing this plan is to help Western achieve its mission to be a premier power marketing and transmission organization. This plan serves as a first step in addressing Westerns human capital issues in the next decade.

  13. Role of Family Satisfaction in Predicting Life Satisfaction Trajectories Over the First Five Years Following Acquired Disability

    E-Print Network [OSTI]

    Herna?ndez, Caitlin Louise

    2012-10-19T23:59:59.000Z

    INTRODUCTION: THE IMPORTANCE OF RESEARCH Incidence of Traumatic Injuries Traumatic injury impacts thousands of people each year, altering the course of their lives and the lives of their families physically, emotionally, socially, and economically.... The National Spinal Cord Injury Statistical Center (2008) estimates that approximately 12,000 people sustain a Spinal Cord Injury (SCI) each year in the United States, with over 200,000 people currently living with an SCI. The number of traumatic injuries...

  14. Disastrous Response to Natural and Man-Made Disasters: An Environmental Justice Analysis Twenty-Five Years after Warren County

    E-Print Network [OSTI]

    Bullard, Robert D.; Wright, Beverly

    2008-01-01T23:59:59.000Z

    commercial hazardous waste facility locations. Residents ofracial disparities in the location of hazardous waste sites.disparities in the location of hazardous waste fa- cilities

  15. Disastrous Response to Natural and Man-Made Disasters: An Environmental Justice Analysis Twenty-Five Years after Warren County

    E-Print Network [OSTI]

    Bullard, Robert D.; Wright, Beverly

    2008-01-01T23:59:59.000Z

    of 149) metropolitan areas with hazardous waste sites (70%)concentrated in areas with com- mercial hazardous sites thanhazardous waste facilities, nearly doubling the percentage in areas

  16. Disastrous Response to Natural and Man-Made Disasters: An Environmental Justice Analysis Twenty-Five Years after Warren County

    E-Print Network [OSTI]

    Bullard, Robert D.; Wright, Beverly

    2008-01-01T23:59:59.000Z

    Officials Homes to the Dickson County Landfill Distance toDistrict Home Landfill (Miles) Number Address 1006 West 1stof the Dickson County Landfill to Elected Officials'

  17. Wood decomposition after five years in anaerobic nitrate rich groundwaters: Implications for lifetime of NitrexTM Permeable Reactive Barriers

    E-Print Network [OSTI]

    Vallino, Joseph J.

    decomposition at the WB barrier. Sulfate reduction: SO4 2- + 2CH2O + 2H+ 2CO2 + H2S + 2H2O 1.2. Questions 2 Abstract Permeable reactive barriers can benefit aquatic ecosystems by using wood chips to remove carbon was more important in the wood from the barriers. Keywords Nitrate removal, Permeable Reactive

  18. Five-year resurvey for endangered species on Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California

    SciTech Connect (OSTI)

    O'Farrell, T.P.; Mathews, N.E.

    1987-09-01T23:59:59.000Z

    A transect survey of Naval Petroleum Reserve No. 1 (NPR-1), Kern County, California, was conducted in 1984 to determine the distribution and relative abundance of endangered species and other wildlife. A total of 589.8 miles of transects were walked through approximately 47,235 acres in all or parts of 81 sections. A total of 16,401 observations of 58 species of wildlife were made which demonstrated the richness and abundance of wildlife on NPR-1 in spite of the intensity of recent petroleum developments. Although most construction activities associated with increased petroleum production took place between the first transect survey in 1979 and this resurvey, no adverse changes in relative densities of kit fox dens, prey base, or other wildlife were observed. NPR-1 should be resurveyed again in 1989. 33 refs., 5 figs., 13 tabs.

  19. Five-year resurvey for endangered species on Naval Petroleum Reserve No. 1, (Elk Hills), Kern County, California

    SciTech Connect (OSTI)

    Otten, M.R.M.; O`Farrell, T.P.; Briden, L.E.

    1992-06-01T23:59:59.000Z

    A transect survey of Naval Petroleum Reserve No. 1 (NPR-1), Kern County, California, was conducted between July 3 and August 5, 1989 to determine the distribution and relative density of endangered species and other wildlife. Results were compared with other reported results, particularly the 1979 and 1984 surveys of NPR-1. A total of 589.8 miles of transects were walked through approximately 47,235 acres in all or parts of 81 sections. Of the 516 San Joaquin kit fox dens observed, 496 were typical subterranean dens and 20 were atypical dens in man-made structures. Estimated den density was 36.7 {plus_minus} 4.1 per square mile; and relative den density was 10.5/1,000 acres for all of NPR-1. Characteristics of typical kit fox dens were comparable to characteristics reported for other studies, except mean number of entrances per den, which was lower. Observers counted a total of 300 dens previously marked with an identification sign, 191 of which contained at least one complete entrance and would have been observed without a sign. Relative densities of preferred kit fox prey, black-toiled jackrabbits (40.1/1,000 acres) and desert cottontails (14.1/1,000 acres), were lower than previously recorded. Five blunt-nosed leopard lizards were observed along the southwest and northeast perimeter of the Reserve. Most of the 59 giant kangaroo rat burrow systems were observed in the flat terrain along the northeast and south perimeters of the Reserve. San Joaquin antelope squirrels were observed in the central and western parts of NPR- 1. A total of 73 antelope squirrels were observed, and the relative density was 1.511,000 acres. A total.of 30 possible environmental hazards were observed during transect surveys. Most of these were oil and water leaks of small size and appeared to pose little risk to endangered species. Results of this survey indicate that NPR-1 is supporting less wildlife than it did during either the 1979 or 1984 surveys.

  20. Five-year resurvey for endangered species on Naval Petroleum Reserve No. 1, (Elk Hills), Kern County, California

    SciTech Connect (OSTI)

    Otten, M.R.M.; O'Farrell, T.P.; Briden, L.E.

    1992-06-01T23:59:59.000Z

    A transect survey of Naval Petroleum Reserve No. 1 (NPR-1), Kern County, California, was conducted between July 3 and August 5, 1989 to determine the distribution and relative density of endangered species and other wildlife. Results were compared with other reported results, particularly the 1979 and 1984 surveys of NPR-1. A total of 589.8 miles of transects were walked through approximately 47,235 acres in all or parts of 81 sections. Of the 516 San Joaquin kit fox dens observed, 496 were typical subterranean dens and 20 were atypical dens in man-made structures. Estimated den density was 36.7 [plus minus] 4.1 per square mile; and relative den density was 10.5/1,000 acres for all of NPR-1. Characteristics of typical kit fox dens were comparable to characteristics reported for other studies, except mean number of entrances per den, which was lower. Observers counted a total of 300 dens previously marked with an identification sign, 191 of which contained at least one complete entrance and would have been observed without a sign. Relative densities of preferred kit fox prey, black-toiled jackrabbits (40.1/1,000 acres) and desert cottontails (14.1/1,000 acres), were lower than previously recorded. Five blunt-nosed leopard lizards were observed along the southwest and northeast perimeter of the Reserve. Most of the 59 giant kangaroo rat burrow systems were observed in the flat terrain along the northeast and south perimeters of the Reserve. San Joaquin antelope squirrels were observed in the central and western parts of NPR- 1. A total of 73 antelope squirrels were observed, and the relative density was 1.511,000 acres. A total.of 30 possible environmental hazards were observed during transect surveys. Most of these were oil and water leaks of small size and appeared to pose little risk to endangered species. Results of this survey indicate that NPR-1 is supporting less wildlife than it did during either the 1979 or 1984 surveys.

  1. Review: United States DOE Five-Year Review (Type 1a), DOE/OR/21548-632

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTableSelling7 AugustAFRICAN3u ;;;:: A' 3 ct' RIDGEGeneral

  2. PNNL Campus Master Plan

    SciTech Connect (OSTI)

    Mosey, Whitney LC

    2012-09-07T23:59:59.000Z

    The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

  3. Business Services Strategic Plan

    E-Print Network [OSTI]

    Holland, Jeffrey

    Business Services Strategic Plan Updated September 2008 New Synergies: Launching Tomorrow's Leaders Discovery with Delivery Meeting Global Challenges Excellence in Business and Support Services #12;Introduction The mission of Business Services at Purdue University is to enable, serve, and support others

  4. Environmental Education Strategic Plan

    SciTech Connect (OSTI)

    none,

    1991-12-01T23:59:59.000Z

    This document is designed to guide the Environmental Education and Development Branch (EM-522) of the EM Office of Technology (OTD) Development, Technology Integration and Environmental Education Division (EM-52) in planning and executing its program through EM staff, Operations Offices, National Laboratories, contractors, and others.

  5. Aerocapacitor commercialization plan

    SciTech Connect (OSTI)

    NONE

    1995-09-12T23:59:59.000Z

    The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

  6. PENSION PLAN INFORMATION SESSION

    E-Print Network [OSTI]

    Kambhampati, Patanjali

    %)* QPP (20%) Personal Savings RRSP, TFSA Company Pension Plan (49%)** Government Benefits Personal.lastname@mcgill.ca). If you forget your McGill Username or McGill Password, try logging into Minerva with your 9-digit McGill ID number and PIN. Once you have logged in successfully, go to the Personal Menu > Password for Mc

  7. Gonzales Comprehensive Plan

    E-Print Network [OSTI]

    Bright, Elise; Cutaia, Louis; Barrios, Nair; Brinkman, Travis; Caraballo, Stephany; Chen, Long; Coleman, Alex; Crosby, Kevin; Dai, Boya; Espinoza, Carlos; Han, Dondjin; Hansen, Todd; Hyde, Allison; Lazaro, Cristopher; Lin, Rosie; Lopez, Michael; Martin, Michael; Masterson, Jaimie Hicks; Medina, Izel; Peackock, Walter M; Sengupta, Koly; Shelnutt, Andrew; Su, Jin; Tan, Shuman; Tang, Taoi; Tran, Tho

    2013-01-01T23:59:59.000Z

    Programs (NFIP) Community Rat- ing System (CRS) which reduces the premiums for policy holders within the municipality. In terms of improving the human environment, the plan addresses the impacts of the oil and gas industry as well as improving trails............242 Environment.....245 Future Environment..........283 Policy Table.........288 Appendix....292 Urban Design...

  8. LCLS Undulator Test Plan

    SciTech Connect (OSTI)

    Wolf, Zachary

    2010-11-24T23:59:59.000Z

    This note presents the test plan for the LCLS undulators. The undulators will be measured and tuned in the Magnetic Measurement Facility at SLAC. The requirements for tuning are well established and are summarized. A brief discussion of the measurement equipment is presented. This is followed by the detailed test plan in which each step is enumerated. Finally, the measurement results and storage format are presented. The LCLS consists of 33 undulator segments, hereafter referred to as undulators, plus 6 spares and one reference undulator. The undulators must be tuned to meet strict requirements. They must also be fiducialized to allow alignment with other components. This note details the plan for tuning and fiducializing the LCLS undulators. The note begins with the list of tuning and fiducialization requirements. The laboratory in which the work will be performed and the relevant equipment is then briefly described. This is followed by a detailed test plan in which all the steps of tuning and fiducialization are enumerated.

  9. Motion Planning ! Jana Kosecka!

    E-Print Network [OSTI]

    Kosecka, Jana

    transform continuous space to discrete! Roadmap methods! Visibility graph! Cell decomposition;6! Roadmap Methods! roadmap! Capture the connectivity of Cfree with a roadmap (graph or network) of one-dimensional curves! difficult! part! Roadmap Methods! Path Planning with a Roadmap! Input: configurations qinit

  10. Student Health Benefit Plan

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    and programs tailored to the needs of students. The SHBP coordinates care with University Health Services (UHS), UMass Amherst's fully accredited health center. UHS provides comprehensive primary care, walk-in care2 2013-2014 Student Health Benefit Plan (SHBP) Designed for the Students of Policy Period: August 1

  11. Search Criteria Health Plan

    E-Print Network [OSTI]

    Gleeson, Joseph G.

    Search Criteria Location: Distance: Health Plan: Provider Type: San Diego, CA 92103 Within 10 miles another provider, you are seeking care from that provider, not from Anthem Blue Cross. The provider benefit decisions only and are not the provision of medical care. Anthem Blue Cross is not responsible for

  12. Plans, Implementation, and Results

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

  13. Impacted material placement plans

    SciTech Connect (OSTI)

    Hickey, M.J.

    1997-01-29T23:59:59.000Z

    Impacted material placement plans (IMPP) are documents identifying the essential elements in placing remediation wastes into disposal facilities. Remediation wastes or impacted material(s) are those components used in the construction of the disposal facility exclusive of the liners and caps. The components might include soils, concrete, rubble, debris, and other regulatory approved materials. The IMPP provides the details necessary for interested parties to understand the management and construction practices at the disposal facility. The IMPP should identify the regulatory requirements from applicable DOE Orders, the ROD(s) (where a part of a CERCLA remedy), closure plans, or any other relevant agreements or regulations. Also, how the impacted material will be tracked should be described. Finally, detailed descriptions of what will be placed and how it will be placed should be included. The placement of impacted material into approved on-site disposal facilities (OSDF) is an integral part of gaining regulatory approval. To obtain this approval, a detailed plan (Impacted Material Placement Plan [IMPP]) was developed for the Fernald OSDF. The IMPP provides detailed information for the DOE, site generators, the stakeholders, regulatory community, and the construction subcontractor placing various types of impacted material within the disposal facility.

  14. Introduction to Transportation Planning

    E-Print Network [OSTI]

    Tipple, Brett

    Introduction to Transportation Planning CMP 4710/6710 Fall 2012 3 Credit Hours Room: ARCH 229 on a Saturday night, transportation is not an objective in and of itself, but a means to carry out the functions of daily living (i.e., it's a "derived good"). As a consequence, the transportation systems we build

  15. Climate Change Scoping Plan

    E-Print Network [OSTI]

    Climate Change Scoping Plan a amework for change Prepared by the California Air Resources BoardBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

  16. Climate Change Scoping Plan

    E-Print Network [OSTI]

    Climate Change Scoping Plan a amework for change as approved Prepared by the California AirBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

  17. Gonzales Comprehensive Plan

    E-Print Network [OSTI]

    Bright, Elise; Cutaia, Louis; Barrios, Nair; Brinkman, Travis; Caraballo, Stephany; Chen, Long; Coleman, Alex; Crosby, Kevin; Dai, Boya; Espinoza, Carlos; Han, Dondjin; Hansen, Todd; Hyde, Allison; Lazaro, Cristopher; Lin, Rosie; Lopez, Michael; Martin, Michael; Masterson, Jaimie Hicks; Medina, Izel; Peackock, Walter M; Sengupta, Koly; Shelnutt, Andrew; Su, Jin; Tan, Shuman; Tang, Taoi; Tran, Tho

    2013-01-01T23:59:59.000Z

    Programs (NFIP) Community Rat- ing System (CRS) which reduces the premiums for policy holders within the municipality. In terms of improving the human environment, the plan addresses the impacts of the oil and gas industry as well as improving trails............242 Environment.....245 Future Environment..........283 Policy Table.........288 Appendix....292 Urban Design...

  18. Action Plan Materials Science

    E-Print Network [OSTI]

    Fitze, Patrick

    sense, including all strata) has available to it a wide range of con- venient products which improve, improving companies' pros- pects and generating wealth without harming the environment. And allAction Plan 2010-2013 Materials Science Area EXECUTIVE SUMMARY #12;N.B.: If you require any further

  19. Planning support systems for spatial planning through social learning

    E-Print Network [OSTI]

    Goodspeed, Robert (Robert Charles)

    2013-01-01T23:59:59.000Z

    This dissertation examines new professional practices in urban planning that utilize new types of spatial planning support systems (PSS) based on geographic information systems (GIS) software. Through a mixed-methods ...

  20. Plan generation strategies for a knowledge based process planning system

    E-Print Network [OSTI]

    Hari, Umesh

    1993-01-01T23:59:59.000Z

    August 1993 Major Subject: Industrial Engineering PLAN GENERATION STRATEGIES FOR A KNOWLEDGE BASED PROCESS PLANNING SYSTEM A Thesis by UMESH HARI Approved as to style and content by: Ri ar . Maye (Chair of Committee) / i en ember) Newton C... valuable comments on the thesis work. I am indebted to Dr. C. J. Su for arousing my interest in process planning. I have learned a lot about process planning and solid modeling from him. I also thank him for directing me to relevant literature...

  1. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    SciTech Connect (OSTI)

    Kirby, Brendan J [ORNL

    2006-07-01T23:59:59.000Z

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second, market and reliability rules have, understandably, been written around the capabilities and limitations of generators, the historic reliability resources. Responsive load limitations and capabilities are often not accommodated in markets or reliability criteria. Third, because of the institutional structure, demand response alternatives are treated as temporary solutions that can delay but not replace transmission enhancement. Financing has to be based on a three to five year project life as opposed to the twenty to fifty year life of transmission facilities. More can be done to integrate demand response options into transmission expansion planning. Given the societal benefits it may be appropriate for independent transmission planning organizations to take a more proactive role in drawing demand response alternatives into the resource mix. Existing demand response programs provide a technical basis to build from. Regulatory and market obstacles will have to be overcome if demand response alternatives are to be routinely considered in transmission expansion planning.

  2. Massachusetts Ocean Management Plan (Massachusetts)

    Broader source: Energy.gov [DOE]

    The Massachusetts Ocean Act of 2008 required the states Secretary of Energy and Environmental Affairs to develop a comprehensive ocean management plan for the state by the end of 2009. That plan...

  3. Climate Action Plan (Ontario, Canada)

    Broader source: Energy.gov [DOE]

    Climate Ready, Ontario's Adaptation Strategy and Action Plan, outlines the problems, goals, and key strategies for the province's approach to climate change and the problems it poses. The Plan...

  4. Accessibility-based transit planning

    E-Print Network [OSTI]

    Busby, Jeffrey R

    2004-01-01T23:59:59.000Z

    A method for evaluating transit planning proposals using accessibility metrics is advanced in this research. A transit-accessibility model is developed intended for use by in-house transit agency planning staff as a ...

  5. LOCAL GOVERNMENT EMERGENCY PLANNING HANDBOOK

    E-Print Network [OSTI]

    management system and communications plan consistent with existing state and federal energy emergencyCALIFORNIA ENERGY COMMISSION LOCAL GOVERNMENT EMERGENCY PLANNING HANDBOOK April 2004 PUBLICATION and authorities, and to integrate their management and communications systems with both the California Energy

  6. Conceptual Site Treatment Plan Laboratory for Energy-Related Health Research Environmental Restoration Project

    SciTech Connect (OSTI)

    Chapman, T.E.

    1993-10-01T23:59:59.000Z

    The Federal Facilities Compliance Act (the Act) of 1992 waives sovereign immunity for federal facilities for fines and penalties under the provisions of the Resource Recovery and Conservation Act, state, interstate, and local hazardous and solid waste management requirements. However, for three years the Act delays the waiver for violations involving US Department of Energy (DOE) facilities. The Act, however, requires that the DOE prepare a Conceptual Site Treatment Plan (CSTP) for each of its sites that generate or store mixed wastes (MWs). The purpose of the CSTP is to present DOE`s preliminary evaluations of the development of treatment capacities and technologies for treating a site`s MW. This CSTP presents the preliminary capacity and technology evaluation for the Laboratory for Energy-Related Health Research (LEHR). The five identified MW streams at LEHR are evaluated to the extent possible given available information. Only one MW stream is sufficiently well defined to permit a technology evaluation to be performed. Two other MW streams are in the process of being characterized so that an evaluation can be performed. The other two MW streams will be generated by the decommissioning of inactive facilities onsite within the next five years.

  7. Climate Action Plan (Manitoba, Canada)

    Broader source: Energy.gov [DOE]

    Manitoba's Climate Action Plan centers around energy efficiency, although it includes mandates and initiatives for renewable sources of energy.

  8. Planning for Years to Come

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Enlarge Create a Sustainable Future: Planning LANL's Governing Policy on the Environment Environmental Sustainability Goals Environmental Management System Regulatory...

  9. Strategic Energy Planning | Department of Energy

    Office of Environmental Management (EM)

    Resources Energy Resource Library Strategic Energy Planning Strategic Energy Planning Below are resources for Tribes on strategic energy planning. Alaska Strategic Energy...

  10. Space Conditioning Standing Technical Committee Strategic Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Committee Strategic Plan Space Conditioning Standing Technical Committee Strategic Plan This strategic plan document outlines the gaps, barriers, and opportunities identified by...

  11. Best Management Practice #1: Water Management Planning

    Broader source: Energy.gov [DOE]

    A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

  12. Planning, Budget, and Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning, Budget, and Analysis Planning, Budget, and Analysis Presentation on Planning, Budget, and Analysis to the DOE Systems Analysis Workshop held in Washington, D.C. July...

  13. Guam Energy Action Plan

    SciTech Connect (OSTI)

    Conrad, M. D.; Ness, J. E.

    2013-07-01T23:59:59.000Z

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  14. SAVEnergy Action Plans

    SciTech Connect (OSTI)

    Mayo, K.; Westby, R. [National Renewable Energy Lab., Golden, CO (United States)] [National Renewable Energy Lab., Golden, CO (United States); deMonsabert, S. [George Mason Univ., Fairfax, VA (United States)] [George Mason Univ., Fairfax, VA (United States); Ginsberg, M. [USDOE, Washington, DC (United States)] [USDOE, Washington, DC (United States)

    1994-04-01T23:59:59.000Z

    The Department of Energy`s Federal Energy Management Program (FEMP) is charged with carrying out key sections of EPACT and Executive Order 12903, to make the Federal government operate more efficiently. A congressionally mandated energy and water conservation audit program is one component of this growing DOE program. This paper traces the SAVEnergy Action Plan program throughout its development from (1) identifying projects and Agency champions, (2) establishing a protocol and fitting auditors into the program, (3) developing a data base to track the audits and measure their success, and (4) evaluating the process, learning from mistakes, and charting and transferring successes. A major tenet of the SAVEnergy program is to proactively prescreen all audit activities to ensure that -- where audits are done and Action Plans completed -- projects will be done.

  15. CIPS Validation Data Plan

    SciTech Connect (OSTI)

    Nam Dinh

    2012-03-01T23:59:59.000Z

    This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

  16. STRATEGIC PLAN PROGRESS REPORT 2014

    E-Print Network [OSTI]

    Shahriar, Selim

    STRATEGIC PLAN PROGRESS REPORT 2014 NORTHWESTERN WILL #12;#12;Dear members of the Northwestern by the progress already made and the impact that the plan continues to have on Northwestern. The plan provides Professor of Molecular Biol- ogy and Biochemistry at the Feinberg School of Medicine. Ground broken

  17. Planning and Search Exam format

    E-Print Network [OSTI]

    Alechina, Natasha

    is the frame problem. Revision 5 #12;Exam topics: planning Classical planning. How the problem definitionPlanning and Search Revision Revision 1 #12;Outline Exam format Exam topics How to revise Revision 2 #12;Exam format 4 questions out of 6 same format as 2010-2011 and 2011-2012 exams (on G52PAS

  18. BUSINESS PLAN SCHOLARSHIP COMPETITION ANNOUNCEMENT

    E-Print Network [OSTI]

    California at Davis, University of

    BUSINESS PLAN SCHOLARSHIP COMPETITION ANNOUNCEMENT Established in late 2001, My Sister's House Sister's House is offering a business plan competition to local college and graduate students to identify. The business plan which should be conducted under the approval of a business or business related professor

  19. McKinney Sustainability Plan

    E-Print Network [OSTI]

    Smith, J.

    2011-01-01T23:59:59.000Z

    CATEE Conference: Planning for Sustainability McKinney?s Draft Community Sustainability Plan: Shaping Our Sustainable Future Julie Smith Office of Environmental Stewardship November 8, 2011 Sustainability Planning ? Why bother? ? Who has... aspect of sustainability ? Created the Green Advisory Committee (GAC) ? November 2008: Green Sustainability Initiative Report ? Recommended forming a comprehensive, sustainability program to coordinate the sustainability agenda for the city...

  20. Energy Management and Conservation Plan

    E-Print Network [OSTI]

    Energy Management and Conservation Plan December 2005 #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan Page 2 of 24 Table of Contents Section One: Executive: Reporting Progress #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan

  1. Lubbock Metropolitan Transportation Plan

    E-Print Network [OSTI]

    Lubbock Metropolitan Planning Organization

    2007-09-18T23:59:59.000Z

    for Users (SAFETEA-LU) and its predecessors, the Transportation Equity Act for the 21st Century (TEA-21) and the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991, specified the transportation systems on which certain federal funds can... in Chapter 5 ? Streets and Highways; Chapter 6 ? Public Transportation; Chapter 7 ? Bicycle and Pedestrian Plan; Chapter 8 ? Lubbock International Airport and Chapter 9 ? Railroads and Trucking. Federally funded transit projects were developed...

  2. Plans, Updates, Regulatory Documents

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for RenewableSpeedingBiomassPPPOPetroleum ReservesThrustBonnevillePlans are nothingand

  3. Mobile systems capability plan

    SciTech Connect (OSTI)

    NONE

    1996-09-01T23:59:59.000Z

    This plan was prepared to initiate contracting for and deployment of these mobile system services. 102,000 cubic meters of retrievable, contact-handled TRU waste are stored at many sites around the country. Also, an estimated 38,000 cubic meters of TRU waste will be generated in the course of waste inventory workoff and continuing DOE operations. All the defense TRU waste is destined for disposal in WIPP near Carlsbad NM. To ship TRU waste there, sites must first certify that the waste meets WIPP waste acceptance criteria. The waste must be characterized, and if not acceptable, subjected to additional processing, including repackaging. Most sites plan to use existing fixed facilities or open new ones between FY1997-2006 to perform these functions; small-quantity sites lack this capability. An alternative to fixed facilities is the use of mobile systems mounted in trailers or skids, and transported to sites. Mobile systems will be used for all characterization and certification at small sites; large sites can also use them. The Carlsbad Area Office plans to pursue a strategy of privatization of mobile system services, since this offers a number of advantages. To indicate the possible magnitude of the costs of deploying mobile systems, preliminary estimates of equipment, maintenance, and operating costs over a 10-year period were prepared and options for purchase, lease, and privatization through fixed-price contracts considered.

  4. Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1988-01-01T23:59:59.000Z

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  5. A study of IMRT planning parameters on planning efficiency, delivery efficiency, and plan quality

    SciTech Connect (OSTI)

    Mittauer, Kathryn [Department of Radiation Oncology, College of Medicine, University of Florida, Gainesville, Florida 32603 and J. Crayton Pruitt Family Department of Biomedical Engineering, University of Florida, Gainesville, Florida 32611 (United States); Lu Bo; Yan Guanghua; Kahler, Darren; Amdur, Robert; Liu Chihray [Department of Radiation Oncology, College of Medicine, University of Florida, Gainesville, Florida 32603 (United States); Gopal, Arun [Department of Radiation Oncology, New York-Presbyterian Hospital, Columbia University, New York, New York 10032 (United States)

    2013-06-15T23:59:59.000Z

    Purpose: To improve planning and delivery efficiency of head and neck IMRT without compromising planning quality through the evaluation of inverse planning parameters.Methods: Eleven head and neck patients with pre-existing IMRT treatment plans were selected for this retrospective study. The Pinnacle treatment planning system (TPS) was used to compute new treatment plans for each patient by varying the individual or the combined parameters of dose/fluence grid resolution, minimum MU per segment, and minimum segment area. Forty-five plans per patient were generated with the following variations: 4 dose/fluence grid resolution plans, 12 minimum segment area plans, 9 minimum MU plans, and 20 combined minimum segment area/minimum MU plans. Each plan was evaluated and compared to others based on dose volume histograms (DVHs) (i.e., plan quality), planning time, and delivery time. To evaluate delivery efficiency, a model was developed that estimated the delivery time of a treatment plan, and validated through measurements on an Elekta Synergy linear accelerator. Results: The uncertainty (i.e., variation) of the dose-volume index due to dose calculation grid variation was as high as 8.2% (5.5 Gy in absolute dose) for planning target volumes (PTVs) and 13.3% (2.1 Gy in absolute dose) for planning at risk volumes (PRVs). Comparison results of dose distributions indicated that smaller volumes were more susceptible to uncertainties. The grid resolution of a 4 mm dose grid with a 2 mm fluence grid was recommended, since it can reduce the final dose calculation time by 63% compared to the accepted standard (2 mm dose grid with a 2 mm fluence grid resolution) while maintaining a similar level of dose-volume index variation. Threshold values that maintained adequate plan quality (DVH results of the PTVs and PRVs remained satisfied for their dose objectives) were 5 cm{sup 2} for minimum segment area and 5 MU for minimum MU. As the minimum MU parameter was increased, the number of segments and delivery time were decreased. Increasing the minimum segment area parameter decreased the plan MU, but had less of an effect on the number of segments and delivery time. Our delivery time model predicted delivery time to within 1.8%. Conclusions: Increasing the dose grid while maintaining a small fluence grid allows for improved planning efficiency without compromising plan quality. Delivery efficiency can be improved by increasing the minimum MU, but not the minimum segment area. However, increasing the respective minimum MU and/or the minimum segment area to any value greater than 5 MU and 5 cm{sup 2} is not recommended because it degrades plan quality.

  6. Unvented Drum Handling Plan

    SciTech Connect (OSTI)

    MCDONALD, K.M.

    2000-08-01T23:59:59.000Z

    This drum-handling plan proposes a method to deal with unvented transuranic drums encountered during retrieval of drums. Finding unvented drums during retrieval activities was expected, as identified in the Transuranic (TRU) Phase I Retrieval Plan (HNF-4781). However, significant numbers of unvented drums were not expected until excavation of buried drums began. This plan represents accelerated planning for management of unvented drums. A plan is proposed that manages unvented drums differently based on three categories. The first category of drums is any that visually appear to be pressurized. These will be vented immediately, using either the Hanford Fire Department Hazardous Materials (Haz. Mat.) team, if such are encountered before the facilities' capabilities are established, or using internal capabilities, once established. To date, no drums have been retrieved that showed signs of pressurization. The second category consists of drums that contain a minimal amount of Pu isotopes. This minimal amount is typically less than 1 gram of Pu, but may be waste-stream dependent. Drums in this category are assayed to determine if they are low-level waste (LLW). LLW drums are typically disposed of without venting. Any unvented drums that assay as TRU will be staged for a future venting campaign, using appropriate safety precautions in their handling. The third category of drums is those for which records show larger amounts of Pu isotopes (typically greater than or equal to 1 gram of Pu). These are assumed to be TRU and are not assayed at this point, but are staged for a future venting campaign. Any of these drums that do not have a visible venting device will be staged awaiting venting, and will be managed under appropriate controls, including covering the drums to protect from direct solar exposure, minimizing of container movement, and placement of a barrier to restrict vehicle access. There are a number of equipment options available to perform the venting. The preferred option is to use equipment provided by a commercial vendor during the first few years of retrieval and venting. This is based on a number of reasons. First, retrieval funding is uncertain. Using a commercial vendor will allow DOE-RL to avoid the investment and maintenance costs if retrieval is not funded. Second, when funding can be identified, retrieval will likely be performed with minimal initial throughput and intermittent operations. Again, costs can be saved by using contracted vendor services only as needed, rather than supporting Hanford equipment full time. When full-scale retrieval begins and the number of drums requiring venting increases significantly, then use of the Hanford container venting system (CVS) should be considered.

  7. NIF Title III engineering plan

    SciTech Connect (OSTI)

    Deis, G

    1998-06-01T23:59:59.000Z

    The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

  8. FY 1994 Annual Work Plan

    SciTech Connect (OSTI)

    Not Available

    1993-09-30T23:59:59.000Z

    In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

  9. Project Management Plan Solution Stabilization

    SciTech Connect (OSTI)

    SATO, P.K.

    1999-08-31T23:59:59.000Z

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  10. Mound Site Community Involvement Plan 2012

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTuba City, Arizona, DisposalFourth Five-Year38Report3 Through

  11. NATIONAL INSTITUTES OF Chemical Hygiene Plan

    E-Print Network [OSTI]

    Bandettini, Peter A.

    NATIONAL INSTITUTES OF HEALTH Chemical Hygiene Plan Division of Occupational Health Chemical Hygiene Plan Evaluation and Record Keeping

  12. Environmental Management System Plan

    SciTech Connect (OSTI)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24T23:59:59.000Z

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environm

  13. ESnet Program Plan 1994

    SciTech Connect (OSTI)

    Merola, S.

    1994-11-01T23:59:59.000Z

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  14. Navy Geothermal Plan

    SciTech Connect (OSTI)

    Not Available

    1984-12-01T23:59:59.000Z

    Domestic geothermal resources with the potential for decreasing fossil fuel use and energy cost exist at a significant number of Navy facilities. The Geothermal Plan is part of the Navy Energy R and D Program that will evaluate Navy sites and provide a technical, economic, and environmental base for subsequent resource use. One purpose of the program will be to provide for the transition of R and D funded exploratory efforts into the resource development phase. Individual Navy geothermal site projects are described as well as the organizational structure and Navy decision network. 2 figs.

  15. ARM - Lesson Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadap Documentation TDMADAP : XDC documentationBarrow, Alaska Outreach Home RoomPlans Outreach Home

  16. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn12electron 9 5 - -/e),,s - 1 2 3 4 5 6 7 8 9 104 Program Plan

  17. Plan Your Visit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeeding accessPeptoidLabPhysics Physics Oursources |Visit Plan your

  18. Guidance for Planning Exercises

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently Asked Questions for DOE FYAffairs, and InternationalPlanning, Conducting and Evaluating

  19. Draft Closure Plan

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Department ofNotices | Department of Energy 29DepartmentNatural

  20. Draft Closure Plan

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Department ofNotices | Department of Energy 29DepartmentNatural8

  1. Draft Closure Plan

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Department ofNotices | Department of Energy 29DepartmentNatural89

  2. Draft Closure Plan

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Department ofNotices | Department of Energy 29DepartmentNatural890

  3. Draft Closure Plan

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Department ofNotices | Department of Energy 29DepartmentNatural8902

  4. Draft Closure Plan

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Department ofNotices | Department of Energy 29DepartmentNatural89026

  5. Draft Closure Plan

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Department ofNotices | Department of Energy 29DepartmentNatural890261

  6. Draft Closure Plan

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Department ofNotices | Department of Energy 29DepartmentNatural890261

  7. TransBorder 2035 Metropolitan Transportation Plan

    E-Print Network [OSTI]

    El Paso Metropolitan Planning Organization

    2007-11-16T23:59:59.000Z

    i TransBorder 2035 Metropolitan Transportation Plan November 16, 2007 El Paso Metropolitan Planning Organization www.elpasompo.org ii TransBorder 2035 Metropolitan Transportation Plan November 16, 2007... El Paso Metropolitan Planning Organization www.elpasompo.org iii TransBorder 2035 Metropolitan Transportation Plan November 16, 2007 El Paso Metropolitan Planning Organization www.elpasompo.org iv Trans...

  8. My PhD Plan Completed Work

    E-Print Network [OSTI]

    Ruina, Andy L.

    Background My PhD Plan Completed Work Planned Work Hierarchical Biped Control A Exam Matthew Kelly August 4, 2014 Matthew Kelly Hierarchical Biped Control 1 / 34 #12;Background My PhD Plan Completed Work Planned Work Table of Contents 1 Background 2 My PhD Plan 3 Completed Work 4 Planned Work Push Hold Free

  9. Institutional Plan FY 2003 - 2007

    SciTech Connect (OSTI)

    Chartock, Michael; Hansen, Todd

    2003-01-27T23:59:59.000Z

    The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the Laboratory Scientific Vision and operations goals. The Initiatives section describes some of the specific new research programs representing major long-term opportunities for the Department of Energy and Berkeley Lab. The Operations Strategic Planning section describes our strategic thinking in the areas of human resources; site and cyber security; workforce diversity; communications and trust; integrated safety management; and technology transfer activities. The Infrastructure Strategic Planning section describes Berkeley Lab's facilities planning process and our site and facility needs. The Summary of Major Issues section provides context for discussions at the Institutional Planning On-Site Review. The Resource Projections are estimates of required budgetary authority for Berkeley Lab's research programs.

  10. Hot Springs Metropolitan Planning Organization 2030 Long Range Transportation Plan

    E-Print Network [OSTI]

    Hot Springs Metropolitan Planning Organization

    2005-11-03T23:59:59.000Z

    Federal Highway Administration Federal Transit Administration 2030 Long Range Transportation Plan for the Hot Springs Area Metropolitan Planning Organization This LRTP has been funded with federal Metropolitan Planning (PL) funds through... the Federal Highway Administration, Section 5303 funds through the Federal Transit Administration, the State of Arkansas, and participating agency local match funds. HSA-MPO 100 Broadway Terrace Hot Springs, AR 71901 501-321-4804 HSA...

  11. South Texas Planning Region Public Transportation Coordination Plan

    E-Print Network [OSTI]

    South Texas Development Council Economic Development Program

    2006-12-15T23:59:59.000Z

    KFH GROUP, INC. SOUTH TEXAS PLANNING REGION PUBLIC TRANSPORTATION COORDINATION PLAN Developed for the: SOUTH TEXAS DEVELOPMENT COUNCIL ECONOMIC DEVELOPMENT PROGRAM By: KFH Group, Incorporated December... that will permit increased levels of service; and 3. To further the state?s efforts to reduce air pollution? (HB3588, Article 13, Chapter 461, Section 461.001). In 2005, the TxDOT Draft Strategic Plan called for the development of regional public transportation...

  12. Waste classification sampling plan

    SciTech Connect (OSTI)

    Landsman, S.D.

    1998-05-27T23:59:59.000Z

    The purpose of this sampling is to explain the method used to collect and analyze data necessary to verify and/or determine the radionuclide content of the B-Cell decontamination and decommissioning waste stream so that the correct waste classification for the waste stream can be made, and to collect samples for studies of decontamination methods that could be used to remove fixed contamination present on the waste. The scope of this plan is to establish the technical basis for collecting samples and compiling quantitative data on the radioactive constituents present in waste generated during deactivation activities in B-Cell. Sampling and radioisotopic analysis will be performed on the fixed layers of contamination present on structural material and internal surfaces of process piping and tanks. In addition, dose rate measurements on existing waste material will be performed to determine the fraction of dose rate attributable to both removable and fixed contamination. Samples will also be collected to support studies of decontamination methods that are effective in removing the fixed contamination present on the waste. Sampling performed under this plan will meet criteria established in BNF-2596, Data Quality Objectives for the B-Cell Waste Stream Classification Sampling, J. M. Barnett, May 1998.

  13. Hanford 200 Areas Development Plan

    SciTech Connect (OSTI)

    Rinne, C.A.; Daly, K.S.

    1993-08-01T23:59:59.000Z

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

  14. Groundwater Protection Plan (West Virginia)

    Broader source: Energy.gov [DOE]

    Groundwater Protection Plans (GPPs) are required for all facilities having the potential to impact groundwater. They are preventive maintenance documents that cover all processes and materials at...

  15. PHYSICS DIVISION CHEMICAL HYGIENE PLAN

    E-Print Network [OSTI]

    Kemner, Ken

    PHYSICS DIVISION CHEMICAL HYGIENE PLAN 2008 Prepared by _________________________________________________ T. Mullen Physics Division Chemical Hygiene Officer Reviewed by ___________________________________________________ J. Woodring Site Chemical Hygiene Officer Approved

  16. National Grid Energy Efficiency Plans

    Broader source: Energy.gov [DOE]

    Presentation covers the National Grid Energy Efficiency plans and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

  17. Chemical Hygiene and Safety Plan

    E-Print Network [OSTI]

    Ricks Editor, R.

    2009-01-01T23:59:59.000Z

    Preventive Maintenance .and Safet_l Plan 6. Preventive Maintenance Hazard ControlE-12, E-13, D-3 preventive maintenance, B-7, F-16 to F-18,

  18. Community Energy Strategic Planning Resources

    Broader source: Energy.gov [DOE]

    Presentation for the Community Energy Stategic Planning Resources webinar, presented on January 24, 2013 as part of the U.S. Department of Energy's Technical Assistance Program (TAP).

  19. Planning Water Use in California

    E-Print Network [OSTI]

    Eisenstein, William; Kondolf, G. Mathias

    2008-01-01T23:59:59.000Z

    the University of Maryland Water Policy Collaborative, 2006.FURTH ER READ ING California Department of Water Resources.California Water Plan Update 2005: A Framework for Action.

  20. Emergency Readiness Assurance Plans (ERAPs)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21T23:59:59.000Z

    This volume describes the assessments and documentation that would ensure that stated response capabilities are sufficient to implement emergency plans. Canceled by DOE G 151.1-3.

  1. Computer aided architectural space planning

    E-Print Network [OSTI]

    Schramek, Charles Wayne

    1971-01-01T23:59:59.000Z

    f' or introducing me to the space planning aspect of ar chitecture. TARLL ilF CUNTCIUTS Ci(RVTI R I CHAI'TCR II INTRODUCTION. ARCHITECTURAL SPACE PLANNING. . CHAPTCR III TIRE SPACL PLANNING PROCESS. . 12 C I I A I ' I C I/ I U CHAI'TF. R U... L I-I A PT F' R U I THE IrlTERREI ATIONS ANALYSIS MODEL. . . THE SPACE ALLOCATION PROGRAM. . . . . . . . FLITLIRE PLANNING AND DEVELOPMENT. . . . . S(1 40 CI-IRPTER UI I THE SUMIMIARY LITERATURE CITEU. Al'Pi: NDICES SAI'IPLE DATA SHEETS II...

  2. Thermal Stabilization Blend Plan

    SciTech Connect (OSTI)

    RISENMAY, H.R.

    2000-05-02T23:59:59.000Z

    This Blend Plan documents the feed material items that are stored in 2736-2 vaults, the 2736-ZB 638 cage, the 192C vault, and the 225 vault that will be processed through the thermal stabilization furnaces. The purpose of thermal stabilization is to heat the material to 1000 degrees Celsius to drive off all water and leave the plutonium and/or uranium as oxides. The stabilized material will be sampled to determine the Loss On Ignition (LOI) or percent water. The stabilized material must meet water content or LOI of less than 0.5% to be acceptable for storage under DOE-STD-3013-99 specifications. Out of specification material will be recycled through the furnaces until the water or LOI limits are met.

  3. GEND planning report

    SciTech Connect (OSTI)

    None

    1980-10-01T23:59:59.000Z

    The Three Mile Island (TMI) Unit 2 accident on March 28, 1979 was and is of great concern to the nuclear industry; electric power generating companies and their customers, regulatory and other government agencies, the entire nuclear community, and to the country as a whole. While the accident resulted in only limited external plant radiation exposure, the plant itself suffered extensive damage with high radiation contamination within the reactor and auxiliary system facilities. The GEND Planning Report for cleanup activities at TMI-2 covers the areas of: instrumentation and electrical equipment survivability; fission product transport; decontamination/radiation dose reduction technology; data bank organization and sample archive facility; characterization of primary system pressure boundary and mechanical components; core damage assessment; and fuel handling, removal, examination and disposal.

  4. A reservoir management plan

    SciTech Connect (OSTI)

    Allis, R.G.

    1989-06-16T23:59:59.000Z

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  5. Mitigation Action Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  6. 12th Semi-Annual Report to Congress on Appliance Energy Efficiency...

    Broader source: Energy.gov (indexed) [DOE]

    2th Semi-annual Implementation Report on Energy Conservation Standards Activities of the U.S. Department of Energy, signed by the Assistant Secretary on August 2012....

  7. The 12th Annual International Sustainable Development Research Conference 2006 Conference Proceedings

    E-Print Network [OSTI]

    Yamamoto, Hitoshi

    to prevent global warming and suggests six concrete actions: how to set thermostats, how to choose eco caused by global warming and can learn what #12;they can do to help prevent global warming. 2. Social electricity or water) are practiced by less than 50% of the population. These results indicate the need

  8. The 12th International Symposium on Transport Phenomena and Dynamics of Rotating Machinery

    E-Print Network [OSTI]

    Boyer, Edmond

    accurate heat transfer measurements. A large review of the fundamental investigations relevant to heat in understanding the physics of turbulent flows and heat transfers in an interdisk cavity. The averaged results the convective heat transfer coefficient (W/m/K) Nu the local Nusselt number P the pressure (bars) Pr

  9. DOE/NNSA Participates in the 12th IAEA Symposium on International...

    National Nuclear Security Administration (NNSA)

    safeguards system to be a central pillar of the nuclear nonproliferation regime's strategy for preventing the spread of nuclear weapons," Mendelsohn talked in detail about...

  10. 12th IFIP/IEEE 1M 2011: Poster Session Online Monitoring for Sustainable Communities of

    E-Print Network [OSTI]

    Bentahar, Jamal

    , United Arab Emirates abdelghani.benharref@adu.ac.ae Abstract-Web Services are considered an attracting of Information Technology, United Arab Emirates University, Al Ain, United Arab Emirates {salahb

  11. Proceedings of the 12th Conference of the European Ceramic Society ECerS XII

    E-Print Network [OSTI]

    Boyer, Edmond

    solicitations: high temperature gradient, aggressive chemical environment and mechanical constraint and with a metallic water wall -temperature approximately 250°C - on the cold face. The temperature in the combustion) to facilitate the heat transfer. The refractories are in contact with smoke and ashes on the hot face

  12. 12th North America Bangla Literature and Culture Convention 2010 (NABLCC10) EFFECT OF SOLAR RADIATION

    E-Print Network [OSTI]

    Nahar, Sultana Nurun

    scatters and burns part of the incoming particles. However, the visible and near-infrared solar radiation penetrate through the earth's atmosphere. Solar Radiation in the Atmosphere and Grrenhouse Effect The solar radiation entering its atmosphere through an energy cycle called the Greenhouse effect. Of the total solar

  13. 12th Conference on IOAS-AOLS New Orleans, LA, Jan, 2008

    E-Print Network [OSTI]

    Xue, Ming

    continuity equation and other constraints by incorporating them into a cost function yielding the 3-D wind-time low-level wind analysis, in addition to WSR-88D radars. Section 2 provides a brief descrip- tion high resolu- tion wind analysis and forecast to be implemented in real-time during spring 2008, we

  14. Threat to UK participation in International Linear Collider 12th December 2007

    E-Print Network [OSTI]

    Crowther, Paul

    line due to concerns about the cost of petrol. The UK, through its central role in the ILC accelerator

  15. The European Consortium for Political Research 2009 General Conference in Potsdam (September 9-12th

    E-Print Network [OSTI]

    Boyer, Edmond

    hermeneutics' organises a de facto comparison between different conceptions of `good practice'. In our view

  16. Presentation to 12th ATF User's Meeting and ATF Program Advisory...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    "Laser-driven cyclotron autoresonance accelerator," in Proc. of the 1999 Particle Accelerator Conf., A. Luccio and W. MacKay, eds., p. 3630 (1999). J. L. Hirshfield and...

  17. Interlaboratory reaction rate program. 12th progress report, November 1976-October 1979

    SciTech Connect (OSTI)

    Lippincott, E.P.; McElroy, W.N.; Preston, C.C. (comps.)

    1980-09-01T23:59:59.000Z

    The Interlaboratory Reaction Rate UILRR) program is establishing the capability to accurately measure neutron-induced reactions and reaction rates for reactor fuels and materials development programs. The goal for the principal fission reactions, /sup 235/U, /sup 238/U and /sup 239/Pu, is an accuracy to within +- 5% at the 95% confidence level. Accurate measurement of other fission and nonfission reactions is also required, but to a lesser accuracy, between +- 5% and 10% at the 95% confidence level. A secondary program objective is improvement in knowledge of the nuclear parameters involved in the standarization of fuels and materials dosimetry measurements of neutron flux, spectra, fluence and burnup.

  18. ISSN0249-6399ISRNINRIA/RR--7929--FR+ENG April 12th, 2012

    E-Print Network [OSTI]

    Paris-Sud XI, Universit de

    are possible depending on the microalgae's strain parameters and the maximal admissible value of the dilution strategy. Key-words: Optimal control, periodic control, photbioreactor, productivity, biofuel BIOCORE

  19. Lugano, 12th November 2012 A supercomputer to understand the failing heart

    E-Print Network [OSTI]

    the failing heart Biventricular pacemakers fail to improve the faulty contraction of the diseased heart in thirty per cent of patients with heart failure. Together conduction system in the heart, which keeps the blood circulation going

  20. N d'ordre : 2011-12-TH TH`ESE DE DOCTORAT

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    areas connected by a multi-terminal HVDC grid) Soutenue le 3 octobre 2011 devant les membres du jury