Powered by Deep Web Technologies
Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

0 20 40 60 80 100 120 020406080100120  

E-Print Network [OSTI]

Engineering (n=127) PSU Acoustics #12;0 5 10 15 20 25 30 051015202530 S ranking Rranking PENN STATE Aerospace Engineering Aerospace Engineering (n=31) PSU Aerospace Engineering #12;0 5 10 15 20 25 0510152025 S ranking 50 60 0102030405060 S ranking Rranking PENN STATE Art History History of Art, Architecture

Omiecinski, Curtis

2

two tanks 1/7/2008 1 0 20 40 60 80 100  

E-Print Network [OSTI]

two tanks 1/7/2008 1 0 100 200 300 400 0 20 40 60 80 100 x t 0 100 200 300 400 0 20 40 60 80 100 tanks Two identical cylindrical tanks X and Y with identical holes in the centre of the bottom are placed one above the other. Tank X starts with 400 ml of water and tank Y starts empty. At t=0 (minutes

Taylor, Peter

3

C1u1 C2u2 20E 60E 100E 140E 180 140W 60W100W 20W  

E-Print Network [OSTI]

x z y x z y C1·u1 C2·u2 #12;80°N 60°N 40°N 20°N 20°S Eq 80°S 40°S 60°S 20°E 60°E 100°E 140°E 180

Fischlin, Andreas

4

Data:65d47992-ad60-4857-80cf-939ce8589831 | Open Energy Information  

Open Energy Info (EERE)

2-ad60-4857-80cf-939ce8589831 2-ad60-4857-80cf-939ce8589831 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bailey County Elec Coop Assn Effective date: 2004/03/01 End date if known: Rate name: Farm & Home service 1O Sector: Residential Description: There will be a $1.00 per KVA over 10 KVA charge applicable to this rate. Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

5

State and National Wind Resource Potential at Various Capacity Factor Ranges for 80 and 100 Meters  

Wind Powering America (EERE)

February 4, 2010 (updated April 13, 2011 to add Alaska and Hawaii) February 4, 2010 (updated April 13, 2011 to add Alaska and Hawaii) State Total (km 2 ) Excluded 2 (km 2 ) Available (km 2 ) Available % of State % of Total Windy Land Excluded Installed Capacity 3 (MW) Annual Generation (GWh) Alabama 15.9 13.3 2.6 0.00% 83.4% 13.2 42 Alaska 267,897.7 209,673.4 58,224.3 3.87% 78.3% 291,121.3 1,051,210 Arizona 611.7 417.3 194.4 0.07% 68.2% 972.1 3,100 Arkansas 1,130.0 687.5 442.5 0.32% 60.8% 2,212.5 7,215 C lif i 11 456 4 8 650 1 2 806 3 0 69% 75 5% 14 031 7 49 073 Estimates of Windy 1 Land Area and Wind Energy Potential, by State, for areas >= 35% Capacity Factor at 80m These estimates show, for each of the 50 states and the total U.S., the windy land area with a gross capacity factor (without losses) of 35% and greater at 80-m height above ground and the wind energy potential that could be possible from development of the "available" windy land area

6

0 20 40 60 80 100 Starting percent of Be12Ti in  

E-Print Network [OSTI]

element. The low threshold (n,2n) reaction makes 9Be the preferred choice material for solid-type breeder the beryllium usage whilst maintaining a high TBR. The energy amplification of the blanket and peak nuclear and photonic energy deposited in any one region should be kept low to minimise the chance of hot spots forming

7

Data:1651e3c1-7a60-41ae-80e1-091a7b92534f | Open Energy Information  

Open Energy Info (EERE)

c1-7a60-41ae-80e1-091a7b92534f c1-7a60-41ae-80e1-091a7b92534f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeastern Indiana R E M C Effective date: 2010/05/01 End date if known: Rate name: Ornamental Lighting Service(100 W HPS) Sector: Lighting Description: Source or reference: http://www.seiremc.com/2006/rate_sch/2010/SLSecurityLightingService-5-1-10.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

8

Data:Ffc4d3a6-0d64-4f98-8247-016b66f80f14 | Open Energy Information  

Open Energy Info (EERE)

Ffc4d3a6-0d64-4f98-8247-016b66f80f14 Ffc4d3a6-0d64-4f98-8247-016b66f80f14 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oregon Trail El Cons Coop, Inc Effective date: 2011/10/01 End date if known: Rate name: Sodium Vapor 200W (78kWh) Area Light, Schedule AL Sector: Lighting Description: Available in OTEC service territory for outdoor area lighting installed on existing OTEC-owned facilities, subject to policies as established by the Board of Directors. Source or reference: http://www.otecc.com/rates.aspx Source Parent: Comments Rate is for photoelectric-operated fixtures operating approximately 4,100 hours per year.

9

Evaporative Concentration of 100x J13 Ground Water at 60% Relative Humidity and 90C  

SciTech Connect (OSTI)

In these experiments we studied the behavior of a synthetic concentrated J13 solution as it comes in contact with a Ni-Cr-Mo-alloy selected for waste canisters in the designated high-level nuclear-waste repository at Yucca Mountain, Nevada. Concentrated synthetic J13 solution was allowed to drip slowly onto heated test specimens (90 C, 60% relative humidity) where the water moved down the surface of the specimens, evaporated and minerals precipitated. Mineral separation or zoning along the evaporation path was not observed. We infer from solid analyses and geochemical modeling, that the most corrosive components (Ca, Mg, and F) are limited by mineral precipitation. Minerals identified by x-ray diffraction include thermonatrite, natrite, and trona, all sodium carbonate minerals, as well as kogarkoite (Na{sub 3}SO{sub 4}F), halite (NaCl), and niter (KNO{sub 3}). Calcite and a magnesium silicate precipitation are based on chemical analyses of the solids and geochemical modeling. The most significant finding of this study is that sulfate and fluoride concentrations are controlled by the solubility of kogarkoite. Kogarkoite thermodynamic data are needed in the Yucca Mountain Project database to predict the corrosiveness of carbonate brines and to establish the extent to which fluoride is removed from the brines as a solid.

Staggs, K; Maureen Alai,; Hailey, P; Carroll, S A; Sutton, M; Nguyen, Q A

2003-12-04T23:59:59.000Z

10

Data:Eda86a80-0ed0-40a2-9f60-0167286c1311 | Open Energy Information  

Open Energy Info (EERE)

Eda86a80-0ed0-40a2-9f60-0167286c1311 Eda86a80-0ed0-40a2-9f60-0167286c1311 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Security Lighting MH 400 W Flood Sector: Lighting Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. Source or reference: http://www.singingriver.com/Files/R-18.pdf Source Parent: Comments Energy Adjustment is Power Cost Adjustment plus Environmental Clause plus Regulatory Adjustment Applicability Demand (kW) Minimum (kW):

11

Data:F2576d67-60eb-484f-80ae-ac4fa903e488 | Open Energy Information  

Open Energy Info (EERE)

76d67-60eb-484f-80ae-ac4fa903e488 76d67-60eb-484f-80ae-ac4fa903e488 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Modesto Irrigation District Effective date: 2013/04/01 End date if known: Rate name: Schedule SL - Nonlisted Light - 25 Watts Sector: Lighting Description: This section of this Schedule is applicable to all night lighting on the public streets, alleys, highways and parks for cities, lighting districts or other public bodies. Public outdoor area lighting for other than all night lighting is supplied under Rate Schedule GS. Source or reference: www.mid.org/tariffs/rates/SL_STREET_LIGHTING.pdf

12

Data:1c39108b-7a60-4a80-8196-1514d05cae3d | Open Energy Information  

Open Energy Info (EERE)

8b-7a60-4a80-8196-1514d05cae3d 8b-7a60-4a80-8196-1514d05cae3d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwest Rural Elec Assn Inc Effective date: 2010/11/01 End date if known: Rate name: 400 Watt HPS or MH, No Energy Sector: Lighting Description: * Subject to Power Cost Adjustment. All bills are adjusted by applicable taxes. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

13

Data:20842e60-5a52-4e43-af71-081dd80c1e6d | Open Energy Information  

Open Energy Info (EERE)

e60-5a52-4e43-af71-081dd80c1e6d e60-5a52-4e43-af71-081dd80c1e6d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Fairfield Electric Coop, Inc Effective date: 2008/12/01 End date if known: Rate name: Construction Service Sector: Commercial Description: * Applicable to temporary service for builders for lighting and power for a construction site using a single point of delivery. Subject to power cost adjustment and tax adjustment. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

14

Data:1a79e18a-cd6c-473c-9851-80eefe8e60e5 | Open Energy Information  

Open Energy Info (EERE)

e18a-cd6c-473c-9851-80eefe8e60e5 e18a-cd6c-473c-9851-80eefe8e60e5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coweta-Fayette El Member Corp Effective date: 2007/04/01 End date if known: Rate name: Electric Heat Rates Sector: Residential Description: Additional Info: Net Metering: Service to an electric consumer under which electric energy generated by the electric consumer from an eligible on-site generation facility and delivered to the local distribution facilities may be used to offset electric energy provide by the electric utility to the electric consumer during the applicable billing period. For additional information contact the EMC's engineering department.

15

Data:1dc60b80-0b05-4522-8336-1015fe610695 | Open Energy Information  

Open Energy Info (EERE)

0b80-0b05-4522-8336-1015fe610695 0b80-0b05-4522-8336-1015fe610695 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Union County Electric Coop Inc Effective date: End date if known: Rate name: commercial multi-phase service Sector: Commercial Description: This charge applies to peak demand. Source or reference: http://www.unioncounty.coop/Account_Services/Rates/index.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

16

Data:3f8e3d60-7a1c-4696-8772-669172c80a78 | Open Energy Information  

Open Energy Info (EERE)

e3d60-7a1c-4696-8772-669172c80a78 e3d60-7a1c-4696-8772-669172c80a78 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hendricks County Rural E M C Effective date: 2012/04/01 End date if known: Rate name: TOU 3- Single-Phase General Service of Time of Use for residential, farm, commercial and public buildings II. Sector: Commercial Description: Availability Available to any member of the organization located on its lines for rural, residential, farm, commercial and public buildings. This rate schedule will serve single-phase member/consumers. Type of service Alternating current, 60-cycle, single phase, 120/240 volts or other industry standard voltages mutually agreeable to the member consumer and the corporation.

17

Data:3f42cb1b-2170-4409-8e80-60a218d1b3d7 | Open Energy Information  

Open Energy Info (EERE)

b-2170-4409-8e80-60a218d1b3d7 b-2170-4409-8e80-60a218d1b3d7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lodi, Wisconsin (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand 8am-8pm Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0811 per kilowatt-hour.

18

Data:E50dcdce-c60a-422a-ae80-0c2b2574107e | Open Energy Information  

Open Energy Info (EERE)

dcdce-c60a-422a-ae80-0c2b2574107e dcdce-c60a-422a-ae80-0c2b2574107e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Mt Horeb, Wisconsin (Utility Company) Effective date: 2009/04/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

19

Data:51e37496-dd10-4a44-9d80-f25ce892b60c | Open Energy Information  

Open Energy Info (EERE)

496-dd10-4a44-9d80-f25ce892b60c 496-dd10-4a44-9d80-f25ce892b60c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 1995/12/15 End date if known: Rate name: General Service, Time-of-Use at Primary Voltage Price Schedule GTN Sector: Industrial Description: APPLICABLE: At the option of the customer, to all electric service required on premises by customer where permanent time-of-use metering is installed, subject to applicable terms and conditions of the Company's Electric Policies and Electric Rate Application. Customer must agree to pay $75 of metering related costs at the time service is elected under this price schedule where such facilities are not already in place, or where such amount is refunded to a

20

Data:84782c60-4ea0-432a-a280-1aa9a80cbdbf | Open Energy Information  

Open Energy Info (EERE)

0-4ea0-432a-a280-1aa9a80cbdbf 0-4ea0-432a-a280-1aa9a80cbdbf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jacksonville Electric Authority Effective date: 2012/01/01 End date if known: Rate name: SL71 Standard MH 400 watts Sector: Lighting Description: To any Public Agency (State, County, or Municipal governments) and to Owner's Associations for automatically controlled lighting of public thoroughfares and to JEA's private residential customers who are owners of the property in question for automatically controlled area lighting. Source or reference: https://www.jea.com/About_Us/Tariffs_and_Reports/Tariffs_and_Reports.aspx

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Data:80b587a7-7d3a-4daf-ad60-c421cb1329bb | Open Energy Information  

Open Energy Info (EERE)

87a7-7d3a-4daf-ad60-c421cb1329bb 87a7-7d3a-4daf-ad60-c421cb1329bb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Indiana Gas & Elec Co Effective date: 2011/05/03 End date if known: Rate name: SL-1 - A - 2500 Lumen Sector: Lighting Description: AVAILABILITY This Rate Schedule shall be available throughout Company's Service Area, subject to the availability of adequate facilities and power supplies, which determinations shall be within Company's reasonable discretion. APPLICABILITY This Rate Schedule shall be applicable for standard street and highway lighting service to any Customer which is a Municipal Corporation.

22

Data:C7f20f80-3645-47d4-9231-979f60db9acd | Open Energy Information  

Open Energy Info (EERE)

-3645-47d4-9231-979f60db9acd -3645-47d4-9231-979f60db9acd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Power, Inc Effective date: 2011/10/01 End date if known: Rate name: 400 W MVL,Street Lighting Metered Sector: Lighting Description: * Applicable to service furnished from the dusk to dawn for area lighting,lighting of public streets,highways,alleys and parks. Streetlights supported on distribution type wood poles from Cooperative-owned overhead or underground system. Rate when light is Metered through customer's service. Source or reference: Rate binder # 4(Illinios State University)

23

Data:47c60ef8-d0c4-4567-bcd2-80baaed9f55a | Open Energy Information  

Open Energy Info (EERE)

ef8-d0c4-4567-bcd2-80baaed9f55a ef8-d0c4-4567-bcd2-80baaed9f55a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Indiana Gas & Elec Co Effective date: 2013/05/01 End date if known: Rate name: MLA - Municipal Levee Authority Service Sector: Industrial Description: AVAILABILITY This Rate Schedule shall be available throughout Company's Service Area, subject to the availability of adequate facilities and power supplies, which determinations shall be within Company's reasonable discretion. Demand Charge: The monthly charge for the first 10 kW of Billing Demand is included in the Energy Charge below. $5.500 per kW per Month for all kW of Billing Demand in excess of 10 kW

24

Data:60f889a9-40cc-4a80-b1ca-29bab8929e70 | Open Energy Information  

Open Energy Info (EERE)

a9-40cc-4a80-b1ca-29bab8929e70 a9-40cc-4a80-b1ca-29bab8929e70 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Flint Electric Membership Corp Effective date: 2007/04/01 End date if known: Rate name: Outdoor Lighting NGOS Directional Flood MH 1000 W Sector: Lighting Description: If on a leased pole, add a $3.10 monthly charge. POLE CHARGES Type, Charge 30' Wood $205.00 35' Wood $220.00 16' Aluminum (Brushed) $250.00 16' Fiberglass (Black) $300.00 16' Fiberglass (Acorn, Black) $800.00 30' Steel & Sub Base $1325.00 30' Fiberglass with 6' Arm $625.00 30' Fiberglass with 2 - 6' Arm $725.00 Source or reference: http://www.flintenergies.com/myHome/residentialRates/covenantStreetLighting.aspx

25

Data:7489ad60-5b9e-4b8f-80c6-04b434f7dfd3 | Open Energy Information  

Open Energy Info (EERE)

0-5b9e-4b8f-80c6-04b434f7dfd3 0-5b9e-4b8f-80c6-04b434f7dfd3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Little Ocmulgee El Member Corp Effective date: 2009/01/01 End date if known: Rate name: Schedule "IM-7" Sector: Residential Description: Applicable to irrigation consumers requiring three-phase, both interruptible and non-interruptible service to irrigation pumps and pivot motors. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

26

Data:742db4f6-7a80-4c3a-b46e-ec7ad60a69f7 | Open Energy Information  

Open Energy Info (EERE)

db4f6-7a80-4c3a-b46e-ec7ad60a69f7 db4f6-7a80-4c3a-b46e-ec7ad60a69f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Security Lighting HPS 150 W Flood Sector: Lighting Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. Source or reference: http://www.singingriver.com/Files/R-18.pdf Source Parent: Comments Energy Adjustment is Power Cost Adjustment plus Environmental Clause plus Regulatory Adjustment Applicability Demand (kW) Minimum (kW):

27

Steam turbines of the T-50/60-8.8, K-63-8.8, and Tp-100/110-8.8 types destined for modernization of thermal power plants with K-50-90 and K-100-90 turbines  

Science Journals Connector (OSTI)

This paper describes the design, schemes of regulation, and control and protection of steam turbines of the T-50/60-8.8, ... of K-50-90 and K-100-90 turbines that have very low efficiency and exhausted...

A. Ye. Valamin; A. Yu. Kultyshev; Yu. A. Sakhnin; M. V. Shekhter

2012-12-01T23:59:59.000Z

28

Data:7a100dd6-0f7c-4f02-ad3d-f3b1ab128602 | Open Energy Information  

Open Energy Info (EERE)

0dd6-0f7c-4f02-ad3d-f3b1ab128602 0dd6-0f7c-4f02-ad3d-f3b1ab128602 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Yellowstone R E A, Inc Effective date: 2010/09/14 End date if known: Rate name: Schedule YL - 400 Watt Mercury Vapor light Sector: Lighting Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

29

Scanned W80  

Broader source: Energy.gov (indexed) [DOE]

Refurbishment of the W80 - Weapon Refurbishment of the W80 - Weapon Type DOE/IG-0590 March 2003 W80 Refurbishment Project Details of Finding ........................................................................1 Recommendations and Comments .............................................5 Appendices 1. Related Reports .....................................................................7 2. Scope and Methodology ........................................................9 3. Management Comments ......................................................10 REFURBISHMENT OF THE W80 -- WEAPON TYPE TABLE OF CONTENTS Page 1 Background Starting in September 1998, Los Alamos National Laboratory (Los Alamos) initiated a project to refurbish the W80. In January 2001, to balance the workload between Lawrence Livermore National

30

File:18 AAC 80.pdf | Open Energy Information  

Open Energy Info (EERE)

AAC 80.pdf AAC 80.pdf Jump to: navigation, search File File history File usage File:18 AAC 80.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 397 KB, MIME type:

31

New Water Booster Pump System Reduces Energy Consumption by 80 Percent and Increases Reliability  

Broader source: Energy.gov [DOE]

This case study outlines how General Motors (GM) developed a highly efficient pumping system for their Pontiac Operations Complex in Pontiac, Michigan. In short, GM was able to replace five original 60- to 100-hp pumps with three 15-hp pumps whose speed could be adjusted to meet plant requirements. As a result, the company reduced pumping system energy consumption by 80 percent (225,100 kWh per year), saving an annual $11,255 in pumping costs. With a capital investment of $44,966 in the energy efficiency portion of their new system, GM projected a simple payback of 4 years.

32

b100.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0 0 Σ (1770) 1/2 + I (J P ) = 1( 1 2 + ) Status: ∗ OMITTED FROM SUMMARY TABLE Evidence for this state now rests solely on solution 1 of BAILLON 75, NODE=B100 (see the footnotes) but the Λ π partial-wave amplitudes of this solu- tion are in disagreement with amplitudes from most other Λ π anal- yses. Σ (1770) MASS Σ (1770) MASS Σ (1770) MASS Σ (1770) MASS NODE=B100M NODE=B100M VALUE (MeV) DOCUMENT ID TECN COMMENT ≈ 1770 OUR ESTIMATE ≈ 1770 OUR ESTIMATE ≈ 1770 OUR ESTIMATE ≈ 1770 OUR ESTIMATE → UNCHECKED ← 1738 ± 10 1 GOPAL 77 DPWA K N multichannel 1770 ± 20 2 BAILLON 75 IPWA K N → Λ π 1772 3 KANE 72 DPWA K - p → Σ π Σ (1770) WIDTH Σ (1770) WIDTH Σ (1770) WIDTH Σ (1770) WIDTH NODE=B100W NODE=B100W VALUE (MeV) DOCUMENT ID TECN COMMENT 72 ± 10 1 GOPAL 77 DPWA K N multichannel 80 ± 30 2 BAILLON 75 IPWA K N → Λ π 80 3 KANE 72 DPWA K - p → Σ π Σ (1770) DECAY MODES Σ (1770) DECAY MODES Σ (1770)

33

Phenomenology from 100 large lattices  

E-Print Network [OSTI]

We present a status report on simulations being done on $32^3 \\times 64$ lattices at $\\beta = 6.0$ using quenched Wilson fermions. Phenomenologically relevant results for the spectrum, decay constants, the kaon B-parameter $B_K$, $B_7$, $B_8$, semi-leptonic and $B\\to K^* \\gamma$ form factors are given based on a statistical sample of 100 configurations.

Tanmoy Bhattacharya; Rajan Gupta

1995-01-15T23:59:59.000Z

34

J. R. Novak Industtial Hygiene 80 Safety  

Office of Legacy Management (LM)

TELfIP"ONE LEYOYT 100 TELfIP"ONE LEYOYT 100 IlllO .____.________ _______ ___.__------. .__ _ _ __ _ _ _ - ----FsC-C-TwXTCm ILL. ,,,o August 12, 1958 _____--_-- __-_____ _- __-__ _ ____ t -. ____________.__ __ _______-- -T-e-- >: J. R. Novak Industtial Hygiene 80 Safety ' FOUL: G. T. Lmergsn, C. S. McKee Industrial Hygiene & Safety lbject: Ext~~lon of Billets, Precision Extrusion Coqsny, May 24, 1958 ~ S. McKee and G. T. Ionergan, both of DIS, monitored the extrusion of the .nd portion of fuel plates for the Argonaut Reactor which is to be ezkhibited I Geneva, Swltserland. The extrusion was accomplished at the Precision busion Compsny in Bensenvi.Ue, Illinois on May 24, 1958. The folkwing .sted AKL personnel were present in addition to those already listed: .L. C.: mes and.J. H. Sane&i, both of MztsJlurgy end T. M. Kennedy, Special

35

PRELIMINARY REPORT 60 Depth(mbsf)  

E-Print Network [OSTI]

#12;LEG197 PRELIMINARYREPORT65 FigureF18 Horizontal intensity (nT) 40,000 80,00020,000 60,000 Basalt Figure F18 #12;LEG 197 PRELIMINARY REPORT 66 Figure F19 197-1203A-24R-1, 30-32 cm 197-1203A-38R-2, 77

36

1995 Buildings in 80's  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Energy Consumption Home Page. If you need assistance in viewing this page, please call (202) 586-8800 Energy Information Administration Home Page Residential Energy Consumption Home Page. If you need assistance in viewing this page, please call (202) 586-8800 Energy Information Administration Home Page Home > Energy Users > Residential Home > 1995 Buildings in 80's 1995 Building in 80's Sources: Energy Information Administration, Office of Energy Markets and End Use, EIA-457 of the 1980 Residential Energy Consumption Survey and Form EIA-871 of the 1989 Commercial Buildings Energy Consumption Survey. Adobe Acrabat Reader NOTE: To View and/or Print PDF's (requires Adobe Acrobat Reader) - Download Acrobat Reader for viewing PDF files If you experience any difficulties, visit our Technical Frequently Asked Questions. You have the option of downloading the entire report or selected sections of the report.

37

Notices 80. Mainestream Finance, Bangor,  

Broader source: Energy.gov (indexed) [DOE]

51 Federal Register 51 Federal Register / Vol. 75, No. 142 / Monday, July 26, 2010 / Notices 80. Mainestream Finance, Bangor, ME, 08-8064-MR. 81. Marine Funding, Inc., South Richmond Hill, NY, 09-9324-MR. 82. Massachusetts Housing Investment Corp, Boston, MA, 09-9073- MR. 83. Member Options LLC, Charlottesville, VA, 10-1754-MRT. 84. Mid Oregon Lending, Inc., Bend, OR, 10-1756-MRT. 85. Midwest Custom Mortgage, Inc., Elgin, IL, 09-9270-MR. 86. Money Connection, Inc., Fairlawn, OH, 09-9273-MR. 87. Money Mortgage Corp., Newark, NJ, 10-1758-MRT. 88. Mortgage Approval Center LLC, Chapel Hill, NC, 10-1759-MRT. 89. Mortgage Direct, Inc., Elmhurst, IL, 10-1761-MRT. 90. Mortgage Options of America, Winchester, MA, 09-9102-MR. 91. Mortgage Security, Inc., East Falmouth, MA, 09-9289-MR.

38

ARM - Datastreams - fslruc60  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Datastreamsfslruc60 Datastreamsfslruc60 Documentation XDC documentation Data Quality Plots ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Datastream : FSLRUC60 Rapid Update Cycle (RUC) model: FSL output, 60 km resolution Active Dates 1994.10.24 - 1994.11.16 Measurement Categories Atmospheric State, Radiometric, Surface Properties Originating Instrument Rapid Update Cycle Model Data (RUC) Measurements The measurements below provided by this product are those considered scientifically relevant. Measurement Variable Precipitation ConvP Latent heat flux LHF Precipitation LgSP Atmospheric pressure MMSP Net broadband total irradiance NR Precipitation PR Precipitation PW Sensible heat flux SHF Soil surface temperature ST Atmospheric pressure

39

Goma 6.0  

SciTech Connect (OSTI)

Goma 6.0, open-sourced in 2013, is finite element software that excels in the analyses of multiphysics processes, particularly those involving the major branches of mechanics.

Schunk, Randy; Rao, Rekha; Johannes, Justine

2014-05-28T23:59:59.000Z

40

Goma 6.0  

ScienceCinema (OSTI)

Goma 6.0, open-sourced in 2013, is finite element software that excels in the analyses of multiphysics processes, particularly those involving the major branches of mechanics.

Schunk, Randy; Rao, Rekha; Johannes, Justine

2014-06-23T23:59:59.000Z

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

100% petroleum house  

E-Print Network [OSTI]

I am designing a Case Study House to be sponsored by Royal Dutch Shell which utilizes the by-product of oil extraction, petroleum gas, to produce a zero waste, 100% petroleum based house. The motivation of the Case Study ...

Costanza, David (David Nicholas)

2013-01-01T23:59:59.000Z

42

Normal-incidence Sb/B{sub 4}C multilayer mirrors for the 80 A < {lambda} < 120 A wavelength range  

SciTech Connect (OSTI)

Periodic and aperiodic Sb/B4C multilayer structures have been theoretically calculated and synthesised for the first time for the application in soft X-ray optics in the 80 A < {lambda} < 120 A range. The reflection spectra of the periodic multilayer mirrors are measured using synchrotron radiation and laser plasma-generated radiation. The experimental spectra are theoretically interpreted with the inclusion of transition layers and substrate roughness. The density of antimony layers is supposedly {rho}{sub (Sb)} = 6.0 g cm{sup -3}, and the thickness of transition layers (if any) in the Sb/B4C multilayer structures does not exceed 10 A. A peak reflectivity of 19 % is attained at a wavelength of 85 A. An aperiodic mirror optimised for maximum uniform reflectivity in the 100 - 120 A range is tested employing the laser plasma radiation source. (x-ray optics)

Vishnyakov, E A; Voronov, D L; Gullikson, E M; Kondratenko, V V; Kopylets, I A; Luginin, M S; Pirozhkov, A S; Ragozin, Evgenii N; Shatokhin, A N

2013-07-31T23:59:59.000Z

43

ARM - Datastreams - noaaaosccn100  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Datastreamsnoaaaosccn100 Datastreamsnoaaaosccn100 Documentation Data Quality Plots ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Datastream : NOAAAOSCCN100 Aerosol Observing System (AOS): cloud condensation nuclei data Active Dates 2009.04.16 - 2013.05.04 Measurement Categories Aerosols, Cloud Properties Originating Instrument Cloud Condensation Nuclei Particle Counter (CCN) Measurements Only measurements considered scientifically relevant are shown below by default. Show all measurements Measurement Units Variable AOS CCN sample pressure hPa CCN_P_sample ( time ) AOS CCN volumetric flowrate of sample air cm^3/minute CCN_Q_sample ( time ) AOS CCN volumetric flowrate of sheath air cm^3/minute CCN_Q_sheath ( time )

44

Data:4158f638-5823-497f-80b8-ce98e01cc236 | Open Energy Information  

Open Energy Info (EERE)

f638-5823-497f-80b8-ce98e01cc236 f638-5823-497f-80b8-ce98e01cc236 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indianapolis Power & Light Co Effective date: 2011/03/15 End date if known: Rate name: MU-1 - a1c - 100 watt HPS - Washington Post Std. Sector: Lighting Description: Lamps in enclosed post top type fixtures, mounted on metal or fiberglass ornamental columns and supplied from underground circuits. APPLICABILITY: For Street and Traffic Lighting of public streets, parkways, improved alleys, boulevards, drives, bridges, parking areas, or other public places by Cities or Towns or by individuals, groups of individuals, associations and other than incorporated municipalities; and lighting of public parks, drives, bridges, parking areas or other public places by only Cities or Towns where there is a prospect that the capital expenditure is warranted. The capital expenditure will be warranted if the amount of revenue received in sixty (60) months exceeds the estimated cost of installation for the lights as calculated by the Company. If the 60-month revenue does not exceed the cost of installation, the Customer must pay two and one-half (2½) times the difference of the cost of installation and the 60-month revenue prior to installation of the lighting. The terms, prices and provisions of this rate schedule shall be applicable to a consolidated city of the first class only to the extent not inconsistent with the specifications, terms, prices and provisions in contracts which may be entered into by such city pursuant to I.C. § 36-9-9-1, et. seq.

45

E-Print Network 3.0 - aged 60-80 years Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Review Collection: Environmental Sciences and Ecology 5 Use of the ZELIG Forest Simulation Model in the Coastal Landscape Analysis and Modeling Study (CLAMS) Summary: ) Stand age...

46

Compact, maintainable 80-KeV neutral beam module  

DOE Patents [OSTI]

A compact, maintainable 80-keV arc chamber, extractor module for a neutral beam system immersed in a vacuum of <10.sup.-2 Torr, incorporating a nested 60-keV gradient shield located midway between the high voltage ion source and surrounding grounded frame. The shield reduces breakdown or arcing path length without increasing the voltage gradient, tends to keep electric fields normal to conducting surfaces rather than skewed and reduces the peak electric field around irregularities on the 80-keV electrodes. The arc chamber or ion source is mounted separately from the extractor or ion accelerator to reduce misalignment of the accelerator and to permit separate maintenance to be performed on these systems. The separate mounting of the ion source provides for maintaining same without removing the ion accelerator.

Fink, Joel H. (Livermore, CA); Molvik, Arthur W. (Livermore, CA)

1980-01-01T23:59:59.000Z

47

Riverwood 100 Building  

High Performance Buildings Database

Atlanta, GA Riverwood 100 is located in the heart of Atlanta's Northwest/Cumberland submarket and is minutes from Buckhead and Midtown. The Class-A high rise is conveniently located adjacent to numerous retailers, restaurants, and hotel amenities, including the newly renovated Cumberland Mall/Galleria and the Cobb Performing Arts Center. Its 23 stories provide views of Central Perimeter, Midtown, and Downtown Atlanta. An attached four-story parking garage provides ample parking for both tenants and guests.

48

60Optimization Satellites are  

E-Print Network [OSTI]

panels to generate electricity using solar cells. Instead, the solar cells have to be mounted the surface area and hence the available power that can be generated by the solar cells? Problem 2 - If only 1/2 of the solar cells receive light at any one time, and the power they can deliver is 100 watts per square meter

49

Atividade DE DE ExP Est proj mon ic ext PET eJrPartEvtapEvtorgEvtcurProfrepAcadofDidporgInstvoluntCultArtCert Carga Mx. Validvel 60 30 60 60 60 60 60 60 60 60 30 10 12 60 10 12 12 12 12 60  

E-Print Network [OSTI]

Stella Santos 60 60 6 126 processo Ok em 07/08/2013 8 Ayr Rodrigo Freitas 60 30 32 122 processo Ok em 07 Murilo Diego Oliveira 60 60 6 126 processo Ok em 07/08/2013 19 Alan Duarte dos Santos 30 60 30 18 0 8 146

Paraná, Universidade Federal do

50

Cinnamon Muffin 100% Apple Juice  

E-Print Network [OSTI]

31 ½ Apple Cinnamon Muffin 100% Apple Juice 5oz Milk Chef Michele Pastorello Milk Choices: Whole White 4oz Juice Choices: 100% Apple 100% Orange NO SCHOOL May 17th SCHOOL CLOSED May 28th Updated 4 100% Orange Juice 5oz Milk Cream of Wheat Sliced Pears 5oz Milk Turkey Sausage Biscuit 100% Apple

Delgado, Mauricio

51

California's Carbon Challenge: Scenarios for Achieving 80%  

E-Print Network [OSTI]

;" iii" EXECUTIVE SUMMARY Meeting"the"State"of"California's"2050"target"of"80%"lower"greenhouse"gas"emissions"that"span"both"energy"demand"and"energy"supply.!!This"study"focuses"on"energy" emissions"with"the"target"of"reducing"energy"emissions"by"80%"relative"to"1990"energy"emissions."" Meeting"the"2050"target

Kammen, Daniel M.

52

100 Area Hanford soil washing treatability tests  

SciTech Connect (OSTI)

Soil washing laboratory tests performed at Hanford in support of 100 Area Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) feasibility studies included characterization of soils, physical separation, chemical extraction, and water treatment. Results to date show that < 20 % of the soil is finer than 0.25 mm ({minus}40 mesh). The highest concentration of {sup 60}Co, {sup 152}Eu, and {sup 137}Cs contaminants is generally associated with fine soil particles. However, measurable concentrations of contaminants were found in all sizes of soil particles. In initial testing, attrition scrubbing was generally sufficient to treat soils to meet selected performance levels for {sup 60}Co and {sup 152}Eu. However, more intense attrition scrubbing, autogenous grinding, or chemical extraction was required to enhance removal of {sup 137}Cs. Additional tests and assessment of the feasibility of using soil washing techniques are in progress.

Field, J.G.; Belden, R.D. [Westinghouse Hanford Co., Richland, WA (United States); Serne, R.J.; Mattigod, S.V.; Freeman, H.D. [Pacific Northwest Lab., Richland, WA (United States); Scheck, R.W. [Mactec/Dames and Moore (United States); Goller, E.D. [USDOE Richland Operations Office, WA (United States)

1993-09-01T23:59:59.000Z

53

ACC100 Crash Energy Management  

Broader source: Energy.gov (indexed) [DOE]

Design Multi-scale Design System developed at Rensselaer Comparison of the multiscale simulation and experimental results for circular tube made of 60 o braid architecture in...

54

100 Areas CERCLA ecological investigations  

SciTech Connect (OSTI)

This document reports the results of the field terrestrial ecological investigations conducted by Westinghouse Hanford Company during fiscal years 1991 and 1992 at operable units 100-FR-3, 100-HR-3, 100-NR-2, 100-KR-4, and 100-BC-5. The tasks reported here are part of the Remedial Investigations conducted in support of the Comprehensive Environmental Response, compensation, and Liability Act of 1980 studies for the 100 Areas. These ecological investigations provide (1) a description of the flora and fauna associated with the 100 Areas operable units, emphasizing potential pathways for contaminants and species that have been given special status under existing state and/or federal laws, and (2) an evaluation of existing concentrations of heavy metals and radionuclides in biota associated with the 100 Areas operable units.

Landeen, D.S.; Sackschewsky, M.R.; Weiss, S.

1993-09-01T23:59:59.000Z

55

ARM - Datastreams - gndrad60s  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Datastreamsgndrad60s Datastreamsgndrad60s Documentation Data Quality Plots Citation DOI: 10.5439/1025192 [ What is this? ] Generate Citation ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Example gndrad60s Archive Data Plot Example gndrad60s Archive Data Plot Datastream : GNDRAD60S Ground radiation sensor: 60-second upwelling Active Dates 1996.10.09 - 2014.01.06 Measurement Categories Radiometric, Surface Properties Originating Instrument Ground Radiometers on Stand for Upwelling Radiation (GNDRAD) Measurements Only measurements considered scientifically relevant are shown below by default. Show all measurements Measurement Units Variable Altitude above mean sea level m alt Base time in Epoch seconds since 1970-1-1 0:00:00 0:00 base_time

56

PROJECT REPORT COOLERADO H80 FIELD REPORT  

E-Print Network [OSTI]

the UC Davis Energy Efficiency Center in 2007 through a grant from the California Clean Energy FundPROJECT REPORT COOLERADO H80 FIELD REPORT University House at UC Davis & Embry-Riddle Aeronautical.0 About the Technology 5 3.0 Demonstration at University House, UC Davis 6 3.1 Results 6 4.0 Demonstration

California at Davis, University of

57

History of 100-B Area  

SciTech Connect (OSTI)

The initial three production reactors and their support facilities were designated as the 100-B, 100-D, and 100-F areas. In subsequent years, six additional plutonium-producing reactors were constructed and operated at the Hanford Site. Among them was one dual-purpose reactor (100-N) designed to supply steam for the production of electricity as a by-product. Figure 1 pinpoints the location of each of the nine Hanford Site reactors along the Columbia River. This report documents a brief description of the 105-B reactor, support facilities, and significant events that are considered to be of historical interest. 21 figs.

Wahlen, R.K.

1989-10-01T23:59:59.000Z

58

IAEA-CN-80/66 ISOTOPE TRACERS IN GLOBAL WATER AND CLIMATE STUDIES  

E-Print Network [OSTI]

comprehensive source of data for evaluating the modern global isotope field generated by atmospheric generalIAEA-CN-80/66 ISOTOPE TRACERS IN GLOBAL WATER AND CLIMATE STUDIES OF THE PAST AND PRESENT T Agency, Wagramer Strasse 5, P.O. Box 100, A-1400 Vienna, AUSTRIA Abstract ISOTOPE TRACERS IN GLOBAL WATER

Edwards, Thomas W.D.

59

ARM - Datastreams - 1twr60m  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1twr60m Archive Data Plot Example 1twr60m Archive Data Plot Datastream : 1TWR60M Sixty Meter Tower: 1-min average temp, humidity & vapor press. at 60-m height Active Dates...

60

New Water Booster Pump System Reduces Energy Consumption by 80...  

Broader source: Energy.gov (indexed) [DOE]

Water Booster Pump System Reduces Energy Consumption by 80 Percent and Increases Reliability New Water Booster Pump System Reduces Energy Consumption by 80 Percent and Increases...

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Printed on Reincarnation Matte Cover, 60% post-consumer waste and 100% recycled Offices/Departments  

E-Print Network [OSTI]

Center for Social Innovation McClelland Dean's Office Faculty West Development Patterson Executive, Center for Entrepreneurial Studies, Center for Social Innovation, MBA Program, Student Life 3rd Floor

Straight, Aaron

62

ARM - Datastreams - brs60s  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Datastreamsbrs60s Datastreamsbrs60s Documentation Data Quality Plots Citation DOI: 10.5439/1025162 [ What is this? ] Generate Citation ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Datastream : BRS60S Broadband Radiometer Station (BRS): 60-second broadband shortwave and longwave radiation Active Dates 2001.03.05 - 2003.04.17 Measurement Categories Radiometric Originating Instrument Broadband Radiometer Station (BRS) Measurements The measurements below provided by this product are those considered scientifically relevant. Measurement Variable Longwave broadband downwelling irradiance down_long_hemisp_shaded Longwave broadband downwelling irradiance down_long_hemisp_shaded_max Longwave broadband downwelling irradiance

63

Data:C6593b63-392f-42c4-a23c-7ab80c7c48cc | Open Energy Information  

Open Energy Info (EERE)

93b63-392f-42c4-a23c-7ab80c7c48cc 93b63-392f-42c4-a23c-7ab80c7c48cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kerrville Public Utility Board Effective date: 2000/01/01 End date if known: Rate name: Security Lights-High Press Sodium Vapor-100 watts Sector: Lighting Description: Applicable throughout the service area to year-round unmetered outdoor security lighting of areas not covered by any other rate schedule. Not applicable to street lighting, standby, shared, or resale service. Service under this rate schedule shall be alternating current, 60 Hertz, single phase. Lamps will be operated from dusk to dawn, or approximately 4,300 hours per year per lamp, and controlled by photoelectric control.

64

Data:0fbb8931-22f4-40ea-80c7-e63468c93379 | Open Energy Information  

Open Energy Info (EERE)

fbb8931-22f4-40ea-80c7-e63468c93379 fbb8931-22f4-40ea-80c7-e63468c93379 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Firelands Electric Coop, Inc Effective date: 2012/05/23 End date if known: Rate name: General Service Single Phase Sector: Residential Description: This schedule is available throughout the Cooperative's entire service area subject to the established Rules and Regulations of the Cooperative. This schedule is applicable to single phase consumers requiring up to and including 100 kVA of installed transformer capacity. Larger service capacities are available under the Large Single Phase, Small and Large Three Phase General Service schedule or under a special contract schedule. CHARACTER AND TYPE OF SERVICE: Single phase, 60 hertz, at available secondary 120/240 nominal voltage.

65

Energy Department Invests $60 Million to Train Next Generation Nuclear  

Broader source: Energy.gov (indexed) [DOE]

60 Million to Train Next Generation 60 Million to Train Next Generation Nuclear Energy Leaders, Pioneer Advanced Nuclear Technology Energy Department Invests $60 Million to Train Next Generation Nuclear Energy Leaders, Pioneer Advanced Nuclear Technology September 20, 2013 - 1:00pm Addthis News Media Contact (202) 586-4940 WASHINGTON - Building on President Obama's Climate Action Plan to continue America's leadership in clean energy innovation, the Energy Department announced today more than $60 million in nuclear energy research awards and improvements to university research reactors and infrastructure. The 91 awards announced today will help train and educate the next generation of leaders in America's nuclear industry as well as support new and advanced nuclear technologies from reactor materials to innovative

66

Energy Department Invests $60 Million to Train Next Generation Nuclear  

Broader source: Energy.gov (indexed) [DOE]

Energy Department Invests $60 Million to Train Next Generation Energy Department Invests $60 Million to Train Next Generation Nuclear Energy Leaders, Pioneer Advanced Nuclear Technology Energy Department Invests $60 Million to Train Next Generation Nuclear Energy Leaders, Pioneer Advanced Nuclear Technology September 20, 2013 - 1:00pm Addthis News Media Contact (202) 586-4940 WASHINGTON - Building on President Obama's Climate Action Plan to continue America's leadership in clean energy innovation, the Energy Department announced today more than $60 million in nuclear energy research awards and improvements to university research reactors and infrastructure. The 91 awards announced today will help train and educate the next generation of leaders in America's nuclear industry as well as support new and advanced nuclear technologies from reactor materials to innovative

67

Kiyoko Yokota 100 Ecology Building  

E-Print Network [OSTI]

1 Kiyoko Yokota 100 Ecology Building Department of Ecology, Evolution and Behavior University: Michael Mullan, Fiona Crawford, and Daniel Paris, 1999-2001 #12;2 Oral presentations Yokota, K. and R. W and Oceanography Aquatic Sciences Meeting. Santa Fe, New Mexico. Yokota, K. and R. W. Sterner. 2006. Long

Sterner, Robert W.

68

ARM - Datastreams - 30twr60m  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Archive Data Plot Example 30twr60m Archive Data Plot Datastream : 30TWR60M Sixty Meter Tower: temperature, humidity, & vapor pressure at 60-m, 30-min avg Active Dates...

69

CX-100 and TX-100 blade field tests.  

SciTech Connect (OSTI)

In support of the DOE Low Wind Speed Turbine (LWST) program two of the three Micon 65/13M wind turbines at the USDA Agricultural Research Service (ARS) center in Bushland, Texas will be used to test two sets of experimental blades, the CX-100 and TX-100. The blade aerodynamic and structural characterization, meteorological inflow and wind turbine structural response will be monitored with an array of 75 instruments: 33 to characterize the blades, 15 to characterize the inflow, and 27 to characterize the time-varying state of the turbine. For both tests, data will be sampled at a rate of 30 Hz using the ATLAS II (Accurate GPS Time-Linked Data Acquisition System) data acquisition system. The system features a time-synchronized continuous data stream and telemetered data from the turbine rotor. This paper documents the instruments and infrastructure that have been developed to monitor these blades, turbines and inflow.

Holman, Adam (USDA-Agriculture Research Service, Bushland, TX); Jones, Perry L.; Zayas, Jose R.

2005-12-01T23:59:59.000Z

70

03-60-214: Computer Languages, Grammars and Translators (2013 Winter)  

E-Print Network [OSTI]

253 3000 ext 3786 · GAs ­ Yunming Mai, maiy at uwin ­ Hao Wang, wang115o at uwin 2 Class time is very important to be successful in this course - students who do not attend lectures and labs generally on the following conversion rule: 2 #12;03-60-214 2013 0% 35% 50% 53% 57% 60% 63% 67% 70% 73% 77% 80% 86% 93% F- F

Lu, Jianguo

71

LS-80 MCT/MVl124  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0 0 MCT/MVl124 January 29, 19R7 F.VALUATION OF EFFECTS OF CABLE LENGTH ON ACCELEROMETER RESPONSF. hy J. A. Jendrzeiczyk anrl R. K. Smith Materials and Components Technolo~y Division 1.0 BACKGROUND The Mvancerl Photon Source CAPS) machtnf' features a stora~e rin~ w1.th a rar/ills of 5')3.5 ft. Gronnd motion at the APS site will he studied hy simultaneously mea!'lurin~ respons~ at seven (7) locations. As illustrateil in Fig. 1, the selecterl locations correspond to the center of the stora~e ring and 60° compass points. Wi th the hattery-powered instrumentation amnlifiers and 7-channel tape recorder located at the site center accelerometer cahle lengths of 62R feet (the outer radius of the experimental hall) are required. To allow for changes in the terrain and

72

DOE Collects $80,000 Civil Penalty From Showerhead Manufacturer...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Collects 80,000 Civil Penalty From Showerhead Manufacturer DOE Collects 80,000 Civil Penalty From Showerhead Manufacturer August 10, 2011 - 4:54pm Addthis The DOE Office of...

73

Torleif Ericson 60th Birthday  

ScienceCinema (OSTI)

Plusieurs discours l'occasion du 60me anniversaire de Torleif Ericson, physicien n Lund (Sude), et remerciements pour son travail et son effort de relier la physique des particules la physique nuclaire. A la fin de la crmonie un document scientifique de 400 pages "die Festschrift" lui est remis comme cadeau d'anniversaire avec un grand nombre de contributions d'amis etc...

None

2011-04-25T23:59:59.000Z

74

IOP PUBLISHING PHYSICA SCRIPTA Phys. Scr. 80 (2009) 048102 (7pp) doi:10.1088/0031-8949/80/04/048102  

E-Print Network [OSTI]

IOP PUBLISHING PHYSICA SCRIPTA Phys. Scr. 80 (2009) 048102 (7pp) doi:10 July 2009 Published 1 October 2009 Online at stacks.iop.org/PhysScr/80/048102 Abstract We have examined. Scr. 80 (2009) 048102 R M Young et al Figure 1. (a) Photoelectron spectra of Hg- n measured with 7.9 e

Neumark, Daniel M.

75

IOP PUBLISHING PHYSICA SCRIPTA Phys. Scr. 80 (2009) 048107 (6pp) doi:10.1088/0031-8949/80/04/048107  

E-Print Network [OSTI]

IOP PUBLISHING PHYSICA SCRIPTA Phys. Scr. 80 (2009) 048107 (6pp) doi:10 2009 Online at stacks.iop.org/PhysScr/80/048107 Abstract The paper reviews recent advantages Printed in the UK #12;Phys. Scr. 80 (2009) 048107 V V Kuznetsov et al diss is much shorter than

76

Reconstruction on Si(100) surfaces  

Science Journals Connector (OSTI)

We have observed several reconstructions on a Si(100) surface with different annealing procedures. The observed reconstructed phases are the coexistence of the (22) phase and the (28) phase after high-temperature (?950 K) annealing followed by quenching, and the half-order streak with the presence of the (21) phase after low-temperature (?950 K) annealing. The phase transition from the metastable (22) and (28) phases to the stable half-order streak is reversible upon annealing temperature and cooling rate. The distribution of kinks and missing dimer defects is expected to be the main cause of these reconstructions.

Young Joo Lee; Sehun Kim; Chi-Sun Hwang; C. Lee; Chanyong Hwang

1994-10-15T23:59:59.000Z

77

59 Gaylord Family-Oklahoma Memorial Stadium 60 Barry Switzer Center  

E-Print Network [OSTI]

CAMPUS MAP 59 Gaylord Family-Oklahoma Memorial Stadium 60 Barry Switzer Center 61 Jones House 62 Bud Wilkinson House 63 Jefferson House 64 Wagner Dining Facility 65 Collums Building 66 Everest Restaurants 77 Couch Tower 78 OCCE Sooner Suites 79 Jim Thorpe Multi-Cultural Center 80 OCCE McCarter Hall

Oklahoma, University of

78

100 MHz NMR Thorium (Solids) | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

100 MHz NMR Thorium (Solids) 100 MHz NMR Thorium (Solids) Research applications Samples containing paramagnetics Soils (SOM and NOM) Metal oxide materials for catalysis...

79

ESH100.3.1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 1 Procedure Title Prepare for and Manage Emergencies Procedure Manager MCPEEK, EUGENE E. Status Active Subject Matter Expert Carol V. Bonney Jaime Marie Mcleod (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce and visitors at Sandia-controlled premises. Members of the Workforce working or visiting at sites other than at Sandia-controlled premises must be aware of and follow the emergency procedures for the host site. Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or

80

La supraconductivit a 100 ans !  

ScienceCinema (OSTI)

Il y a 100 ans, le 8 avril 1911, une dcouverte majeure tait ralise : celle de la supraconductivit. La supraconductivit est la caractristique qu?ont certains mtaux et alliages de perdre toute rsistance lectrique en dessous d?une temprature donne. Cette renversante dcouverte, ralise de manire presque fortuite par Kammerlingh Onnes de l?Universit de Leyde (Pays-Bas) et son tudiant Gilles Holst, a ouvert un nouveau champ de recherche en physique et de fabuleuses perspectives d?applications technologiques. Du point de vue scientifique, la supraconductivit est en effet l?une des rares manifestations de la physique quantique l?chelle macroscopique. Du point de vue des retombes techniques, elle est porteuse d?applications majeures dans le domaine de la sant, des communications et de l?nergie. 100 ans aprs, les physiciens n?ont toujours pas fini d?explorer ce phnomne et ses applications. Le CERN abrite des applications de la supraconductivit des chelles indites. L?acclrateur de particules LHC, avec ses milliers d?aimants supraconducteurs rpartis sur 27 kilomtres de circonfrence, est en effet la plus grande application mondiale de la supraconductivit. Il ne pourrait exister sans elle. Le CERN fte donc la dcouverte de la supraconductivit avec une confrence exceptionnelle donne par Philippe Lebrun. Au cours de cette confrence, l?exprience historique de Kammerlingh Onnes sera reproduite. Philippe Lebrun racontera l?histoire de cette tonnante dcouverte, en la replaant dans le contexte scientifique de l?poque. Il racontera les dveloppements scientifiques et les applications du premier sicle de la supraconductivit. Confrence en franais Merci de bien vouloir vous inscrire au : +41 22 767 76 76 ou cern.reception@cern.ch

None

2011-10-06T23:59:59.000Z

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

MHK Projects/Pulse Stream 100 Demonstration Project | Open Energy  

Open Energy Info (EERE)

Pulse Stream 100 Demonstration Project Pulse Stream 100 Demonstration Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.6405,"lon":-0.16257,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

82

A New Generation (60 seconds) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

60 seconds) A New Generation (60 seconds) anewgeneration60apprv2.mp3 More Documents & Publications A New Generation (30 seconds) Flowers (60 seconds) Flowers (3...

83

ARM - Datastreams - 1440twr60m  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Send us a note below or call us at 1-888-ARM-DATA. Send Datastream : 1440TWR60M Sixty Meter Tower: daily minimummaximum met data, with times, at 60-m height Active Dates...

84

Data:D9832318-0f80-41b1-8029-08bf074d8181 | Open Energy Information  

Open Energy Info (EERE)

18-0f80-41b1-8029-08bf074d8181 18-0f80-41b1-8029-08bf074d8181 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nashville Electric Service Effective date: 2012/06/01 End date if known: Rate name: 60-Minute Response Sector: Commercial Description: 60 MR is an interruptible overlay. The overlay amends the standard contract and applicable rate schedule by adding 60 MR pricing and interruption arrangements. Source or reference: http://www.nespower.com/60mr.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

85

Data:A3c99f85-5e0a-4a80-bbe1-a849f9a14cb6 | Open Energy Information  

Open Energy Info (EERE)

c99f85-5e0a-4a80-bbe1-a849f9a14cb6 c99f85-5e0a-4a80-bbe1-a849f9a14cb6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Fulton County Rural E M C Effective date: End date if known: Rate name: RESIDENTIAL AND FARM SERVICE Sector: Residential Description: Applicable only for single-phase supplies through one meter to each residential or farm service. Maximum transformer size supplied under this rate is 100 kVA. Alternating current, 60 cycle, single-phase at a voltage approximately 120/240 volts three-wire, or other voltages as might be mutually agreeable. The fuel cost adjustment in dollars per kWh shall be the same as that recently billed to the Fulton County REMC by its purchase power supplier, less $.000000 per kWh, such difference to be divided by one (1) minus the total energy losses of the utility for the preceding calendar year expressed as a decimal fraction of the total energy purchased for the same year.

86

100 LPW 800 Lm Warm White LED  

SciTech Connect (OSTI)

An illumination grade warm white (WW) LED, having correlated color temperature (CCT) between 2800 K and 3500K and capable of producing 800 lm output at 100 lm/W, has been developed in this program. The high power WW LED is an ideal source for use as replacement for incandescent, and Halogen reflector and general purpose lamps of similar lumen value. Over the two year period, we have made following accomplishments: developed a high power warm white LED product and made over 50% improvements in light output and efficacy. The new high power WW LED product is a die on ceramic surface mountable LED package. It has four 1x1 mm{sup 2} InGaN pump dice flip chip attached to a ceramic submount in 2x2 array, covered by warm white phosphor ceramic platelets called Lumiramic? and an overmolded silicone lens encapsulating the LED array. The performance goal was achieved through breakthroughs in following key areas: (1) High efficiency pump LED development through pump LED active region design and epi growth quality improvement (funded by internal programs). (2) Increase in injection efficiency (IE) represented by reduction in forward voltage (V{sub f}) through the improvement of the silver-based p-contact and a reduction in spreading resistance. The injection efficiency was increased from 80% at the start of the program to 96% at the end of the program at 700 mA/mm{sup 2}. (3) Improvement in thermal design as represented by reduction in thermal resistance from junction to case, through improvement of the die to submount connection in the thin film flip chip (TFFC) LED and choosing the submount material of high thermal conductivity. A thermal resistance of 1.72 K/W was demonstrated for the high power LED package. (4) Improvement in extraction efficiency from the LED package through improvement of InGaN die level and package level optical extraction efficiency improvement. (5) Improvement in phosphor system efficiency by improving the lumen equivalent (LE) and phosphor package efficiency (PPE) through improvement in phosphor-package interactions. Another achievement in the development of the phosphor integration technology is the demonstration of tight color control. The high power WW LED product developed has been proven to have good reliability. The manufacturing of the product will be done in Philips Lumileds?? LUXEON Rebel production line which has produced billions of high power LEDs. The first high power WW LED product will be released to the market in 2011.

Decai Sun

2010-10-31T23:59:59.000Z

87

Martian laser surpasses 100,000 zaps  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Martian laser surpasses 100,000 zaps Martian laser surpasses 100,000 zaps ChemCam zaps rocks with a high-powered laser to determine their composition and carries a camera that can...

88

JLab Cluster Tops 100 Teraflops | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

JLab Cluster Tops 100 Teraflops NEWPORT NEWS, VA, Oct. 14 - The fastest computer system in Hampton Roads has booted up with more than 100 Teraflops of processing power. Located at...

89

0 50 100 150m International  

E-Print Network [OSTI]

0 50 100 150m Lake Burley Griffin Sullivan's Creek International Sculpture Park From Fenner Hall ToFenner

90

100ALUMNI OF INFLUENCE University of Saskatchewan  

E-Print Network [OSTI]

100ALUMNI OF INFLUENCE #12;University of Saskatchewan 100 Alumni of Influence As our office prepared for the University of Saskatchewan's 100th anniversary celebrations in 2007, we felt Turner; Past President Joy Crawford, University of Saskatchewan Alumni Association; Ms. Joanne Paulson

Saskatchewan, University of

91

Thermal Stability of Deuterated C60 Films  

Science Journals Connector (OSTI)

C60 thin films on HOPG surfaces were generated by the low-energy deposition of mass-selected C60+ ion beams (ion soft-landing). ... The corresponding TRMS map of the deuterated film comprises a comet-like emission feature, with a maximum centered at 720 amu and a 40-amu-long stripe oriented nearly horizontally in (T,M)-space reflecting weak emission of C60Dx species. ...

Daniel Lffler; Patrick Weis; Artur Bttcher; Manfred Kappes

2007-08-29T23:59:59.000Z

92

Secretary Chu Announces Nearly $80 Million Investment for Advanced Biofuels  

Broader source: Energy.gov (indexed) [DOE]

80 Million Investment for Advanced 80 Million Investment for Advanced Biofuels Research and Fueling Infrastructure Secretary Chu Announces Nearly $80 Million Investment for Advanced Biofuels Research and Fueling Infrastructure January 13, 2010 - 12:00am Addthis Washington, DC - U.S. Department of Energy Secretary Steven Chu today announced the investment of nearly $80 million under the American Recovery and Reinvestment Act for advanced biofuels research and fueling infrastructure that will help support the development of a clean sustainable transportation sector. The selections announced today - two biofuels consortia for up to $78 million to research algae-based and other advanced biofuels - are part of the Department's continued effort to spur the creation of the domestic bio-industry while creating jobs.

93

VP 100: Producing Electric Truck Vehicles with a Little Something Extra |  

Broader source: Energy.gov (indexed) [DOE]

VP 100: Producing Electric Truck Vehicles with a Little Something VP 100: Producing Electric Truck Vehicles with a Little Something Extra VP 100: Producing Electric Truck Vehicles with a Little Something Extra August 6, 2010 - 10:31am Addthis VP 100: Producing Electric Truck Vehicles with a Little Something Extra Kevin Craft What does this mean for me? Smith Electric Vehicles included in Vice President's report on 100 Recovery Act Projects That Are Changing America. Smith plans to hire at least 50 employees by the end of the year. Through a Recovery Act grant, that company - Smith Electric Vehicles (SEV) - is taking a different tact that could lay the foundation for the industry's future. Not only is the company manufacturing all-electric, zero-emission commercial trucks, it's collecting data on how these commercial EVs are used. In Kansas City, Mo., an 80-year old company is on

94

Electronic properties and morphology of Cu-phthalocyanineC{sub 60} composite mixtures  

SciTech Connect (OSTI)

Phthalocyanines in combination with C{sub 60} are benchmark materials for organic solar cells. Here, we have studied the morphology and electronic properties of co-deposited mixtures (blends) of these materials forming a bulk heterojunction as a function of the concentration of the two constituents. For a concentration of 1:1 of Cu-Phthalocyanine (CuPc):C{sub 60}, a phase separation into about 100?nm size domains is observed, which results in electronic properties similar to layered systems. For low C{sub 60} concentrations (10:1 CuPc:C{sub 60}), the morphology, as indicated by Low-Energy Electron Microscopy images, suggests a growth mode characterized by (amorphous) domains of CuPC, whereby the domain boundaries are decorated with C{sub 60}. Despite of these markedly different growth modes, the electronic properties of the heterojunction films are essentially unchanged.

Roth, Friedrich [Center for Free-Electron Laser Science/DESY, Notkestrae 85, D-22607 Hamburg (Germany); Lupulescu, Cosmin [Institute of Optics and Atomic Physics, TU Berlin, Strae des 17. Juni 135, D-10623 Berlin (Germany); Arion, Tiberiu [Center for Free-Electron Laser Science/DESY, Notkestrae 85, D-22607 Hamburg (Germany); Institut fr Experimentalphysik, Universitt Hamburg, Luruper Chaussee 149, D-22761 Hamburg (Germany); Darlatt, Erik; Gottwald, Alexander [Physikalisch-Technische Bundesanstalt (PTB), Abbestrae 2-12, D-10587 Berlin (Germany); Eberhardt, Wolfgang [Center for Free-Electron Laser Science/DESY, Notkestrae 85, D-22607 Hamburg (Germany); Institute of Optics and Atomic Physics, TU Berlin, Strae des 17. Juni 135, D-10623 Berlin (Germany)

2014-01-21T23:59:59.000Z

95

Preliminary Thermal Modeling of HI-STORM 100 Storage Modules at Diablo Canyon Power Plant ISFSI  

SciTech Connect (OSTI)

Thermal analysis is being undertaken at Pacific Northwest National Laboratory (PNNL) in support of inspections of selected storage modules at various locations around the United States, as part of the Used Fuel Disposition Campaign of the U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) Fuel Cycle Research and Development. This report documents pre-inspection predictions of temperatures for two modules at the Diablo Canyon Power Plant ISFSI identified as candidates for inspection. These are HI-STORM 100 modules of a site-specific design for storing PWR 17x17 fuel in MPC-32 canisters. The temperature predictions reported in this document were obtained with detailed COBRA-SFS models of these storage systems, with the following boundary conditions and assumptions. storage module overpack configuration based on FSAR documentation of HI-STORM100S-218, Version B; due to unavailability of site-specific design data for Diablo Canyon ISFSI modules Individual assembly and total decay heat loadings for each canister, based on at-loading values provided by PG&E, aged to time of inspection using ORIGEN modeling o Special Note: there is an inherent conservatism of unquantified magnitude informally estimated as up to approximately 20% -- in the utility-supplied values for at-loading assembly decay heat values Axial decay heat distributions based on a bounding generic profile for PWR fuel. Axial location of beginning of fuel assumed same as WE 17x17 OFA fuel, due to unavailability of specific data for WE17x17 STD and WE 17x17 Vantage 5 fuel designs Ambient conditions of still air at 50F (10C) assumed for base-case evaluations o Wind conditions at the Diablo Canyon site are unquantified, due to unavailability of site meteorological data o additional still-air evaluations performed at 70F (21C), 60F (16C), and 40F (4C), to cover a range of possible conditions at the time of the inspection. (Calculations were also performed at 80F (27C), for comparison with design basis assumptions.) All calculations are for steady-state conditions, on the assumption that the surfaces of the module that are accessible for temperature measurements during the inspection will tend to follow ambient temperature changes relatively closely. Comparisons to the results of the inspections, and post-inspection evaluations of temperature measurements obtained in the specific modules, will be documented in a separate follow-on report, to be issued in a timely manner after the inspection has been performed.

Cuta, Judith M.; Adkins, Harold E.

2014-04-17T23:59:59.000Z

96

ESH100.2.ENV.26  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 Procedure Title Manage Other Waste at SNL/NM Procedure Manager PUISSANT, PAMELA M. Status Active Subject Matter Expert Ralph J. Wrons Janet S. Harris-CA Contact Mark E. Brynildson-CA Contact Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce on Sandia-controlled premises and to all Members of the Workforce involved in activities on Sandia-controlled premises within the State of New Mexico that generate, manage, accumulate, or request disposal of the following waste types: ESH100.2.ENV.26 (i.e., regular trash). ESH100.2.ENV.26 . ESH100.2.ENV.26 . ESH100.2.ENV.26 . ESH100.2.ENV.26 . ESH100.2.ENV.26 . Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click

97

Heating a Plasma to 100 Million Kelvin.  

E-Print Network [OSTI]

?? In this work techniques for heating the fusion reactor ITER to thermonuclear temperatures, over 100 million kelvin, is investigated. The temperature is numerically computed (more)

Frberg, Gunnar

2014-01-01T23:59:59.000Z

98

Density changes in amorphous Pd{sub 80}Si{sub 20} during low temperature ion irradiation  

SciTech Connect (OSTI)

Density changes in amorphous Pd{sub 80}Si{sub 20} during ion irradiation below 100K were detected by in situ HVEM measurements of the changes in specimen length as a function of ion fluence. A decrease in mass density as a function of the ion fluence was observed. The saturation value of the change in mass density was determined to be approximately -1.2%.

Schumacher, G.; Birtcher, R.C.; Rehn, L.E.

1994-11-01T23:59:59.000Z

99

California's Carbon Challenge: Scenarios for Achieving 80% Emissions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Challenge: Scenarios for Achieving 80% Emissions Carbon Challenge: Scenarios for Achieving 80% Emissions Reduction in 2050 Title California's Carbon Challenge: Scenarios for Achieving 80% Emissions Reduction in 2050 Publication Type Report LBNL Report Number LBNL-5448E Year of Publication 2012 Authors Wei, Max, James H. Nelson, Michael K. Ting, Christopher Yang, J. Greenblatt, James E. McMahon, Daniel M. Kammen, Christopher M. Jones, Ana Mileva, Josiah Johnston, and Ranjit Bharvirkar Date Published 10/2012 Abstract Meeting the State of California's 2050 target of 80% lower greenhouse gas emissions (GHG) from a 1990 baseline is a challenging goal that cannot be met without a portfolio of measures and strategies that span both energy demand and energy supply. This study focuses on energy emissions with the target of reducing energy emissions by 80% relative to 1990 energy emissions. Meeting the 2050 target requires both a sustained commitment to aggressively develop existing technologies as well as an aggressive and sustained policy commitment to reshape and ultimately transform the state's energy system. The 2050 GHG target for California appears achievable, but requires significant changes in the way we produce energy, deliver energy services, and utilize energy.

100

100 years of history Queen's University Belfast  

E-Print Network [OSTI]

100 years of history Queen's University Belfast School of Mechanical & Aerospace Engineering Centenary 1912 - 2012 This site celebrates 100 years of electrical and mechanical engineering degrees in engineering and in engineering education. Prior to 1912 When the Queen's College Belfast was established

Martin, Ralph R.

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Patch Bounding Circles Nearest Neighbor >100ha  

E-Print Network [OSTI]

Patch Bounding Circles Nearest Neighbor >100ha 0 meters / >100ha Edge Dumbarton Marsh New Chicago Marsh Guadalupe Slough Bair Island 0 5 Miles 0 5 Kilometers µ Patch patterns of tidal marsh. We used the marsh patch boundaries as potential barriers to movement for tidal

102

TX-100 manufacturing final project report.  

SciTech Connect (OSTI)

This report details the work completed under the TX-100 blade manufacturing portion of the Carbon-Hybrid Blade Developments: Standard and Twist-Coupled Prototype project. The TX-100 blade is a 9 meter prototype blade designed with bend-twist coupling to augment the mitigation of peak loads during normal turbine operation. This structural coupling was achieved by locating off axis carbon fiber in the outboard portion of the blade skins. The report will present the tooling selection, blade production, blade instrumentation, blade shipping and adapter plate design and fabrication. The baseline blade used for this project was the ERS-100 (Revision D) wind turbine blade. The molds used for the production of the TX-100 were originally built for the production of the CX-100 blade. The same high pressure and low pressure skin molds were used to manufacture the TX-100 skins. In order to compensate for the difference in skin thickness between the CX-100 and the TX-100, however, a new TX-100 shear web plug and mold were required. Both the blade assembly fixture and the root stud insertion fixture used for the CX-100 blades could be utilized for the TX-100 blades. A production run of seven TX-100 prototype blades was undertaken at TPI Composites during the month of October, 2004. Of those seven blades, four were instrumented with strain gauges before final assembly. After production at the TPI Composites facility in Rhode Island, the blades were shipped to various test sites: two blades to the National Wind Technology Center at the National Renewable Energy Laboratory in Boulder, Colorado, two blades to Sandia National Laboratory in Albuquerque, New Mexico and three blades to the United States Department of Agriculture turbine field test facility in Bushland, Texas. An adapter plate was designed to allow the TX-100 blades to be installed on existing Micon 65/13M turbines at the USDA site. The conclusion of this program is the kick-off of the TX-100 blade testing at the three testing facilities.

Ashwill, Thomas D.; Berry, Derek S. (TPI Composites, Inc., Warren, RI)

2007-11-01T23:59:59.000Z

103

Project Management Plan Examples 1 - 80 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Examples 1 - 80 Examples 1 - 80 Project Management Plan Examples 1 - 80 The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The descriptions below should be used to navigate to the subject of interest. Policy & Operational Decisions, Assumptions and Strategies - Examples 1 & 2 - Includes organizational responsibilities and structure, disposition path, future use of facility, S&S Reqs and plan, hazard elimination or mitigation, NEPA, RCRA, CERCLA, HVAC/lighting service reqs, structural integrity reqs, etc. Facility End State Decisions - Examples 3, 4 & 5 - Includes expected conditions at completion of the deactivation, DOE mission use, extended S&M, decommissioned and/or dismantled, etc.

104

Project Management Plan Examples 1 - 80 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Project Management Plan Examples 1 - 80 Project Management Plan Examples 1 - 80 Project Management Plan Examples 1 - 80 The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The descriptions below should be used to navigate to the subject of interest. Policy & Operational Decisions, Assumptions and Strategies - Examples 1 & 2 - Includes organizational responsibilities and structure, disposition path, future use of facility, S&S Reqs and plan, hazard elimination or mitigation, NEPA, RCRA, CERCLA, HVAC/lighting service reqs, structural integrity reqs, etc. Facility End State Decisions - Examples 3, 4 & 5 - Includes expected conditions at completion of the deactivation, DOE mission use, extended S&M, decommissioned and/or dismantled, etc.

105

100 years of living science THE SCHISTOSOMIASIS  

E-Print Network [OSTI]

· Transfer of technology and building sustainability #12;43 million treatments in 5 ears During 2007 of using existingpp y g g Ministry of Health staff and school teachers and capital costs such as buildings over $80 per year #12;Sustainable prevention and control strategiesSustainable prevention and control

106

Carbon Dioxide Capture and Gas Separation on B80 Fullerene  

Science Journals Connector (OSTI)

Carbon Dioxide Capture and Gas Separation on B80 Fullerene ... All other clusters show the optimized chemisorbed configurations of CO2 captured on B80. ... Although air capture will cost more than capture at power generating facilities when both are operated under the same economic conditions, air capture allows one to apply industrial economies of scale to small and mobile emission sources and enables a partial decoupling of C capture from the energy infrastructure; advantages which may compensate for the intrinsic difficulty of capturing C from air. ...

Qiao Sun; Meng Wang; Zhen Li; Aijun Du; Debra J. Searles

2014-01-09T23:59:59.000Z

107

Printed on Reincarnation Matte Cover, 60% post-consumer waste and 100% recycled content Offices/Departments  

E-Print Network [OSTI]

Operations, Center for Entrepreneurial Studies, Center for Social Innovation, MBA Program, Student Life 3rd and Learning Experiences (CIRCLE) McClelland Center for Entrepreneurial Studies McClelland Center for Social Innovation McClelland Dean's Office Faculty West Development Patterson Executive Education MBA Class of '68

Straight, Aaron

108

Comparison of coupling of humans to electric and magnetic fields with frequencies between 100 Hz and 100 kHz  

SciTech Connect (OSTI)

Recent laboratory and epidemiological results have stimulated interest in the hypothesis that human beings may exhibit biological responses to magnetic and/or electric field transients with frequencies in the range between 100 Hz and 100 kHz. Much can be learned about the response of a system to a transient stimulation by understanding its response to sinusoidal disturbances over the entire frequency range of interest. Thus, the main effort of this paper was to compare the strengths of the electric fields induced in homogeneous ellipsoidal models by uniform 100 Hz through 100 kHz electric and magnetic fields. Over this frequency range, external electric fields of about 25--2,000 V/m (depending primarily on the orientation of the body relative to the field) are required to induce electric fields inside models of adults and children that are similar in strength to those induced by an external 1 {mu}T magnetic field. Additional analysis indicates that electric fields induced by uniform external electric and magnetic fields and by the nonuniform electric and magnetic fields produced by idealized point sources will not differ by more than a factor of two until the sources are brought close to the body. Published data on electric and magnetic field transients in residential environments indicate that, for most field orientations, the magnetic component will induce stronger electric fields inside adults and children than the electric component. This conclusion is also true for the currents induced in humans by typical levels of 60 Hz electric and magnetic fields in US residences.

Kaune, W.T. [EM Factors, Richland, WA (United States)] [EM Factors, Richland, WA (United States); Guttman, J.L. [Enertech Consultants, Campbell, CA (United States)] [Enertech Consultants, Campbell, CA (United States); Kavet, R. [Electric Power Research Inst., Palo Alto, CA (United States)] [Electric Power Research Inst., Palo Alto, CA (United States)

1997-03-01T23:59:59.000Z

109

Construction Documents (100%) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Construction Documents (100%) Construction Documents (100%) Construction Documents (100%) October 16, 2013 - 4:38pm Addthis Construction documents (100%) represent the final set of drawings that will be issued for contractors to bid on. At this point, all architectural and engineering systems have been reviewed and designed to ensure that project goals are being met. A final review with all members participating in previous reviews should be planned to ensure all information from previous design reviews have been incorporated into the construction documents and all other renewable energy integration issues have been resolved before being issued for bid. At this point, it is expected there will be few, if any, changes to the overall building design. The planned renewable energy technologies will

110

BOSTON UNIVERSITY Policy BU-100-001  

E-Print Network [OSTI]

to extreme heat or cold or other potentially harmful environmental conditions. Protect the equipment from theft. 2.5.3. For policies regarding remote access to Boston University's information resources, see Remote Access Policy [BU 100-001A]. #12;

Guenther, Frank

111

Data:80c80eb4-749a-46e1-8fb6-80c58e025f49 | Open Energy Information  

Open Energy Info (EERE)

eb4-749a-46e1-8fb6-80c58e025f49 eb4-749a-46e1-8fb6-80c58e025f49 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Seneca, South Carolina (Utility Company) Effective date: End date if known: Rate name: Comm Non-Demand Sector: Commercial Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/628/Seneca%20Light%20and%20Water.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

112

Alkali-metal stoichiometry and structure of K4C60 and Rb4C60  

Science Journals Connector (OSTI)

Alkali-metal fulleride samples KxC60 and RbxC60 with stoichiometries close to x=4 were examined with x-ray powder-diffraction measurements at room temperature. We have shown through Rietveld refinements that A4C60 is a line phase with charge per lattice site that is closer to integer than in any other fulleride. The C60 molecules are disordered between two possible orientations within the body-centered-tetragonal lattice with the three orthogonal twofold rotation axes aligned with the unit-cell translation vectors in space group I4/mmm. The x-ray diffraction results exclude any quadrupole distortion of the fullerene molecule beyond about 0.04 ?. These results suggest that K4C60 and Rb4C60 may be Mott insulators.

Christine A. Kuntscher; Gtz M. Bendele; Peter W. Stephens

1997-02-01T23:59:59.000Z

113

http://edocsrpts.doe.gov:80/edocsreports/SingleItem.rpt | Department...  

Broader source: Energy.gov (indexed) [DOE]

http:edocsrpts.doe.gov:80edocsreportsSingleItem.rpt http:edocsrpts.doe.gov:80edocsreportsSingleItem.rpt http:edocsrpts.doe.gov:80edocsreportsSingleItem.rpt More...

114

Federal Acquisition Circular 2005-60  

Broader source: Energy.gov (indexed) [DOE]

Circular 2005-60 Circular 2005-60 SUMMARY: This document summarizes the Federal Acquisition Regulation (FAR) rules agreed to by the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) in this Federal Acquisition Circular (FAC) 2005-60. Item Subject FAR Case I Reporting Executive Compensation and First-Tier Subcontract Awards 2008-039 II Payments Under Time-and- Materials and Labor-Hour Contracts 2011-003 III Extension of Sunset Date for Protests of Task and Delivery Orders 2012-007 IV DARPA-New Mexico Tax Agreement 2012-019 V Clarification of Standards for Computer Generation of Forms 2011-022 VI Technical Amendments Item I Reporting Executive Compensation and First-Tier Subcontract Awards (FAR Case

115

Extended depth secondary recovery: more coal for the 80's  

SciTech Connect (OSTI)

There are a variety of surface mining techniques presently in use which are physically or economically unable to recover all of the coal available. A new technique known as extended depth secondary recovery is presently available in the form of the Thin Seam Miner, which is able to recover 80-85% of this otherwise lost coal, to depths of 220 feet. Extended depth secondary recovery began with the auger, which has enjoyed moderate success, despite major drawbacks. Punch mining, longwall and shortwall technologies and the push-button miner all attempted to economically remine areas, with very little success. The Thin Seam Miner, on the other hand, not only recovers 80-85% of the coal in place to depths of 220 feet, but is environmentally sound, economically feasible, safe, and adapted to mine under all the seam conditions and grades of coal found in Appalachia.

Shearer, L.K.

1982-12-01T23:59:59.000Z

116

60-DAY Federal Register Notice - Proposed  

Broader source: Energy.gov (indexed) [DOE]

60-DAY Federal Register Notice - Proposed 60-DAY Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the

117

DOE Awards Sixteen Contracts for up to $80 Billion in Energy...  

Energy Savers [EERE]

Sixteen Contracts for up to 80 Billion in Energy Efficiency, Renewable Energy, and Water Conservation Projects at Federal Facilities DOE Awards Sixteen Contracts for up to 80...

118

A 100-Gigbit Highway for Science  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

A 100-Gigabit Highway for A 100-Gigabit Highway for Science News & Publications ESnet in the News ESnet News Media & Press Publications and Presentations Galleries ESnet Awards and Honors Contact Us Technical Assistance: 1 800-33-ESnet (Inside the US) 1 800-333-7638 (Inside the US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net A 100-Gigabit Highway for Science Researchers Take a "Test Drive" on ANI Testbed April 30, 2012 | Tags: Advanced Network Initiative (ANI) Linda Vu, lvu@lbl.gov, +1 510 495 2402 A warming climate will likely change the statistics of tropical cyclones and hurricanes. This image represents one frame from a simulation called "Hurricane Season" that was created to study how well NCAR's Community

119

Magnetism of Mn layers on Fe(100)  

Science Journals Connector (OSTI)

The magnetic state of epitaxial overlayers of Mn grown on Fe(100) is studied using spin-polarized electron energy loss spectroscopy. Nonzero exchange asymmetries are found, demonstrating that the surface layer of the Mn overlayers has a net magnetic moment. The exchange asymmetry oscillates with a period of about two atomic layers as the Mn overlayer thickness is varied, proving that the Mn forms ferromagnetic (100) sheets and that the sheets align antiferromagnetically. The average Mn exchange splitting is found to be 2.9 eV, indicating a magnetic moment of the order 3?B.

T. G. Walker and H. Hopster

1993-08-01T23:59:59.000Z

120

Side Orders Potato Wedges 1.60  

E-Print Network [OSTI]

Side Orders Potato Wedges £1.60 Choose your dip from: Soured Cream, Spicy Salsa or Barbecue Potato Wedges topped with Cheese £2.00 Choose your dip from: Soured Cream, Spicy Salsa or Barbecue Potato Wedges leaf salad, potato wedges and a soured cream dip. Refried Bean Burrito £5.25 Refried beans, onions

Dixon, Peter

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Policy Flash 2011-60 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

60 Policy Flash 2011-60 PolicyFlash2011-60.pdf More Documents & Publications Policy Flash 2011-84 Policy Flash 2011-86 Policy Flash 2011-90...

122

Babcock and Wilcox BR-100 100-ton rail/barge spent fuel shipping cask  

SciTech Connect (OSTI)

This Preliminary Design Report (PDR) provides a detailed description of the design, analyses, and testing programs for the BR-100 cask. The BR-100 is a Type B(U) cask designed for transport by rail or barge. This report presents the preliminary analyses and tests which have been performed for the BR-100 and outlines the confirmatory analyses and tests which will be performed.

none,

1990-02-01T23:59:59.000Z

123

Data:7a3e260b-d80d-4b3d-932a-4d69d206565d | Open Energy Information  

Open Energy Info (EERE)

60b-d80d-4b3d-932a-4d69d206565d 60b-d80d-4b3d-932a-4d69d206565d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salmon River Electric Coop Inc Effective date: 2009/12/16 End date if known: Rate name: Dusk to Dawn Lighting (Street Light) Service (200-400W) Sector: Lighting Description: Service under this schedule is applicable to electric service provided for the outdoor dusk to dawn lighting of commercial, industrial, and residential member grounds, yards, driveways, and premises by means of a Cooperative-owned luminary, mounted on an existing Cooperative pole with a support bracket, automatically controlled by a photoelectric relay.

124

Martian laser surpasses 100,000 zaps  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Martian laser surpasses 100,000 zaps Martian laser surpasses 100,000 zaps Martian laser surpasses 100,000 zaps ChemCam zaps rocks with a high-powered laser to determine their composition and carries a camera that can survey the Martian landscape. December 5, 2013 This figure is a ChemCam Remote Micro Imager (RMI) image of the target "Ithaca". The image is a mosaic of three separate images taken on Sol 439, with the scale as shown. The image shows the scars from the ten LIBS points labeled from point 1 to point 10. One of the 30 shots at point no. 1 was the 100,000th firing of the ChemCam laser! The distance to the target from the ChemCam telescope at the top of the mast was 4.04 m. The vertical line of ten points taken by ChemCam on Ithaca, starts in a pitted lower coarser grained unit and crosses into a finer grained, smoother, upper unit. The chemical composition appears to be very similar between units. (Image credit: NASA/JPL-Caltech/LANL/CNES/IRAP)

125

100 area excavation treatability test plan  

SciTech Connect (OSTI)

This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Development and screening of remedial alternatives for the 100 Area, using existing data, have been completed and are documented in the 100 Area Feasibility Study, Phases 1 and 2 (DOE-RL 1992a). Based on the results of the FS, the Treatability Study Program Plan (DOE-RL 1992b) identifies and prioritizes treatability studies for the 100 Area. The data from the treatability study program support future focused FS, interim remedial measures (IRM) selection, operable unit final remedy selection, remedial design, and remedial actions. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992b). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications.

Not Available

1993-05-01T23:59:59.000Z

126

Bond Strength of Grade 100 Reinforcing Steel  

E-Print Network [OSTI]

The bond strength of Grade 100 ASTM A 1035 reinforcing steel manufactured by MMFX Technologies Corp. is evaluated with respect to bond strength equations found in ACI 318-05 and ACI 408R-03. Test specimens are fullscale beam-splice specimens tested...

Miller, Shelby

2007-12-14T23:59:59.000Z

127

EGGN 100 -INTRODUCTION TO ENGINEERING COURSE DESCRIPTION  

E-Print Network [OSTI]

: Design and implementation of low-power adjustable audio amplifier circuit** Week 8 Electrical Engineering Engineering project: Design and implementation of a low-power adjustable audio amplifier circuit StudentsEGGN 100 - INTRODUCTION TO ENGINEERING COURSE DESCRIPTION Introduction to engineering disciplines

de Lijser, Peter

128

Introduction The AdenoPACK 100 adenovirus  

E-Print Network [OSTI]

an excellent performance in small scale virus purification. However, they are also scalable and confirm to cIntroduction The AdenoPACK 100 adenovirus purification and concentration kit is intended-vitro transfections. The kit includes all reagents and devices necessary for clarification, purification

Lebendiker, Mario

129

C60 Secondary Ion Fourier Transform Ion Cyclotron Resonance Mass...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

C60 Secondary Ion Fourier Transform Ion Cyclotron Resonance Mass Spectrometry. C60 Secondary Ion Fourier Transform Ion Cyclotron Resonance Mass Spectrometry. Abstract: Secondary...

130

Department Of Energy Offers $60 Million to Spur Industry Engagement...  

Office of Environmental Management (EM)

Of Energy Offers 60 Million to Spur Industry Engagement in Global Nuclear Energy Partnership Department Of Energy Offers 60 Million to Spur Industry Engagement in Global Nuclear...

131

Energy Department Invests $60 Million to Train Next Generation...  

Office of Environmental Management (EM)

60 Million to Train Next Generation Nuclear Energy Leaders, Pioneer Advanced Nuclear Technology Energy Department Invests 60 Million to Train Next Generation Nuclear Energy...

132

Reliable Muddle: Transportation Scenarios for the 80% Greenhouse Gas Reduction Goal for 2050 (Presentation)  

SciTech Connect (OSTI)

Presentation describing transportation scenarios for meeting the 2050 DOE goal of reducing greenhouse gases by 80%.

Melaina, M.; Webster, K.

2009-10-28T23:59:59.000Z

133

Determination of the Content of C80 Tetraacids in Petroleum  

Science Journals Connector (OSTI)

In order to formulate mitigation strategies before the onset of oil pipeline and topside deposition problems caused by so-called calcium naphthenates or chelates of ARN acids, it is necessary to develop an analytical technique suitable for the quantification of the constituent C80 tetraacids in small samples (?1 g) of crude oils at low parts per million (ppm) concentrations. ... Deposit formation in oil pipelines and topside equipment during petroleum production is a problematic flow assurance issue for the oil industry and can lead to costly production downtime and the need for expensive remediation strategies during loss of production. ... Boduszynski, M. M. Compn. of heavy petroleums. ...

Paul A. Sutton; Steven J. Rowland

2014-08-28T23:59:59.000Z

134

CERN 60 years of science for peace  

E-Print Network [OSTI]

What is the Universe made of? Where did it come from, where is it going and why does it behave the way it does? These are some of the questions that CERN set out to address 60 years ago when a small number of pioneering scientists created Europes first scientific international organization. Founded in the aftermath of the second world war, CERN is not only a first-class centre for fundamental research but also a pioneering adventure in international collaboration.

Fabienne, Marcastel

2014-01-01T23:59:59.000Z

135

ESH100.2.IH.19  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 9 Procedure Title Evaluate and Control Asphyxiant Hazards Procedure Manager HOOPER, LISA Z. Status Active Subject Matter Expert Ryann E. Washburn (Ryann Fisher) Daniel Kuey (Dan) (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce who participate in activities on Sandia-controlled premises involving the use or storage of simple asphyxiants, unless exempted below. Specific activities that are exempted include ventilated spaces that are not confined spaces, where all pressure systems comply with Corporate Procedure ESH100.2.PS.1, Control Pressure Safety Hazards and meet one of the conditions listed below. Additional requirements for confined space hazards are contained in ESH100.2.IH.9, Enter Confined Spaces Safely.

136

Interaction of oxygen with sodium at 80 and 20 K  

Science Journals Connector (OSTI)

We have studied the interaction of oxygen with evaporated Na films at 80 and 20 K, by means of core-level and valence photoemission spectroscopy and photoexcited Auger spectroscopy, as well as plasmon loss structures associated with core-level emission. The initial oxidation at 80 and 20 K is characterized by an oxygen 2p resonance at about -3.4 eV with respect to the Fermi level, increasing intensity in the Na-O interatomic Auger transition, increasing width and intensity of the Na 2p core level, and changes in the surface-plasmon loss region which might be interpreted as a decreasing free-electron density. Further oxidation leads to oxygen valence emission at -7.4 and -8.4 eV, which may be due to O-O interaction. Larger O2 exposures yield a valence band with structure at -3.2, -5.3, -7.2, and -9.5 eV.

M. L. Shek; Xiaohe Pan; Myron Strongin; M. W. Ruckman

1986-09-15T23:59:59.000Z

137

Design of applicative 100 W Stirling engine  

SciTech Connect (OSTI)

A small 100 W displacer type Stirling engine is being developed under a project of a JSME committee, RC127. The project consists of sixteen Japanese academic researchers of universities and governmental laboratories and eleven enterprise members related to the Stirling field. The engine has very unique features. Its expansion cylinder is heated by combustion gas or solar energy directly, and a simple cooling system rejects heat from the working fluid. A regenerator is built in the displacer piston with heating and cooling tubes in which the working fluid flows from/to outer tubes. The outer tubes for heating were located at the top of the expansion cylinder and the tubes for cooling are in the middle of the cylinder. The target performance is a 100 W output with 20% thermal efficiency at the operating conditions of 923 K expansion space temperature, 343 K compression space temperature, and 1,000 rpm. The 100 W displacer engine was designed based on a design manual established by a related JSME committee, RC110. It contains several guides to design for cycle, heat exchanger system, and mechanism of most Stirling cycle machines. The engine was designed by using the fundamental method, the second and third-order analyses accomplished with the newly arranged knowledge about each component. This paper presents the engine specifications and the theoretical analysis results. The design method is also introduced briefly.

Kagawa, Noboru [National Defense Academy, Yokosuka (Japan). Dept. of Applied Physics; Hirata, Koichi; Takeuchi, Makoto [and others

1995-12-31T23:59:59.000Z

138

Annual Summary Report Calendar Year 2000 for the 100-HR-3, 100-KR-4, and 100-NR-2 Operable Units and Pump-and-Treat Operations  

SciTech Connect (OSTI)

This annual progress and performance evaluation report discusses the groundwater remedial actions in the 100 Area, including the interim actions at the 100-HR-3 and 100-KR-4 Operable Units, and also discusses the expedited response action in the 100-NR-2 operable unit.

G. B. Mitchem

2001-08-22T23:59:59.000Z

139

Photochemical Bissilylation of C60 with Disilane1  

Science Journals Connector (OSTI)

Photochemical Bissilylation of C60 with Disilane1 ... The photochemical reaction of C60 with disilane 1 affords the adduct 2 as a bissilylated product. ... 3 In this context, we report here the strikingly low oxidation potential of the bissilylated C60 obtained in the photochemical reaction of C60 with a disilane. ...

Takeshi Akasaka; Toshiyasu Suzuki; Yutaka Maeda; Mikiko Ara; Takatsugu Wakahara; Kaoru Kobayashi; Shigeru Nagase; Masahiro Kako; Yasuhiro Nakadaira; Mamoru Fujitsuka; Osamu Ito

1998-12-30T23:59:59.000Z

140

Welding of HSLA-100 steel using ultra low carbon bainitic weld metal to eliminate preheating  

SciTech Connect (OSTI)

Advanced high strength steels such as the Navy`s HSLA-100 and HSLA-80 contain sufficiently low carbon levels to be weldable without preheating. Unfortunately, commercial filler metals specifically designed to weld these steels without costly preheating have not yet been developed. The objective of this paper is to show that the Navy`s advanced steels can be welded by gas metal-arc (GMAW) and gas tungsten-arc welding (GTAW) without preheating by using filler metal compositions that produce weld metal with an ultra-low carbon bainitic (ULCB) microstructure. Filler metals were fabricated from vacuum induction melted (VIM) ingots containing ultra-low levels of C, O and N. HSLA-100 plate and plate from the VIM ingots were welded by both GMAW and GTAW with Ar-5% CO{sub 2} shielding gas using welding conditions to achieve cooling times from 800 to 500 C (t{sub 8-5}) from 35 to 14 sec. Weld metal tensile, hardness and CVN impact toughness testing as well as microstructural studies using transmission electron microscopy were conducted. The ULCB weld metal was relatively insensitive to cooling rate, resulting in good strength and toughness values over a wide range of t{sub 8-5} cooling times. Filler metal compositions which met the mechanical property requirements for HSLA-100, HSLA-80 and HSLA-65 weld metal were developed.

Devletian, J.H.; Singh, D.; Wood, W.E. [Oregon Graduate Inst. of Science and Technology, Portland, OR (United States)

1996-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Buildings and Energy in the 80's -- Publication and Tables  

U.S. Energy Information Administration (EIA) Indexed Site

Publication and Tables Publication and Tables Publication and Tables Total Residential and Commercial Primary Consumption by Type of Building Figure on total residential and commercial primary consumption by type of building Sources: Energy Information Administration, Office of Energy Markets and End Use, EIA-457 of the 1980 Residential Energy Consumption Survey and Form EIA-871 of the 1989 Commercial Buildings Energy Consumption Survey. Divider Bar To View and/or Print Reports (requires Adobe Acrobat Reader) - Download Adobe Acrobat Reader If you experience any difficulties, visit our Technical Frequently Asked Questions. Divider Bar You have the option of downloading the entire report or selected sections of the report. Full Report (without tables) - Buildings and Energy in the 80's (file size .93 MB) pages: 104

142

Formation of the radio jet in M87 at 100 Schwarzschild radii from the central black hole  

Science Journals Connector (OSTI)

... 60 near the centre, with strong collimation of the jet occurring at ?30100 Schwarzschild radii (rS) from the black hole: collimation continues out to ?1,000?rS ... constant, M is the black-hole mass, and c the speed of light; the Schwarzschild radius is the radius of the event horizon, the boundary of a black ...

William Junor; John A. Biretta; Mario Livio

1999-10-28T23:59:59.000Z

143

The SNL100-01 blade : carbon design studies for the Sandia 100-meter blade.  

SciTech Connect (OSTI)

A series of design studies to investigate the effect of carbon on blade weight and performance for large blades was performed using the Sandia 100-meter All-glass Baseline Blade design as a starting point. This document provides a description of the final carbon blade design, which is termed as SNL100-01. This report includes a summary of the design modifications applied to the baseline all-glass 100-meter design and a description of the NuMAD model files that are made publicly available. This document is intended primarily to be a companion document to the distribution of the NuMAD blade model files for SNL100-01.

Griffith, Daniel Todd

2013-02-01T23:59:59.000Z

144

ESH100.2.IH.16  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 Procedure Title Evaluate and Control Unbound Engineered Nanoscale Particles Procedure Manager HOOPER, LISA Z. Status Active Subject Matter Expert Christopher Ryan Mckean (Chris) Daniel Kuey (Dan) (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce and visitors who participate in activities involving unbound engineered nanoscale particles (UNP) on Sandia-controlled premises. The SNL Chemical Hygiene Plan (see ESH100.2.IH.4, Evaluate and Control Chemical Hazards) contains requirements for general chemical use in laboratories, including hazards and controls for all chemicals associated with UNP activities. The requirements set forth in this procedure do not apply to: Bound engineered nanoscale particles.

145

SP-100 design, safety, and testing  

SciTech Connect (OSTI)

The SP-100 Program is developing a nuclear reactor power system that can enhance and/or enable future civilian and military space missions. The program is directed to develop space reactor technology to provide electrical power in the range of tens to hundreds of kilowatts. The major nuclear assembly test is to be conducted at the Hanford Site near Richland, Washington, and is designed to validate the performance of the 2.4-MWt nuclear and heat transport assembly. 10 refs., 5 figs.

Smith, G.L.; Cox, C.M.; Mahaffey, M.K.

1990-07-01T23:59:59.000Z

146

Measured and predicted response for 100 piles  

E-Print Network [OSTI]

)CH N BACKI Le. BUTT DIAOI6 7 ER WEIGHT I SIZE NO OF F BLOttS 0 21 22 23 24 NO. I' F BI DIOS NO OF BLOWS 61 62 63 ltO. OF BLOIYS C cl Ibf b. LJ J G W Cb Cb Cb t IAATERIAL LLASTIC PHU FRTIE) CONDITION AT ENO OF ORIVINC...Donald (Head of Department) December 1985 ABSTRACT Measured and Predicted Response for 100 Piles. (Dec. 1985) Joseph Stephen Andeson, B. S. , Texas AAM University Chairman of Advisory Committee: Dr. Jean-Louis Briaud This report deals with the prediction...

Anderson, Joseph Stephen

2012-06-07T23:59:59.000Z

147

Data:52f5d1ca-5860-4b94-b196-80ee625c9e62 | Open Energy Information  

Open Energy Info (EERE)

ca-5860-4b94-b196-80ee625c9e62 ca-5860-4b94-b196-80ee625c9e62 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Broad River Electric Coop, Inc Effective date: 2012/07/01 End date if known: Rate name: Schedule L2, Acorn, 1 Light Per 4 Sector: Lighting Description: * Applicable to any consumers of the Cooperative receiving service under rate schedules 10,20,and 80. Subdivision street lighting must be any BREC decorative special (B) 100-Watt HPS or 175-watt MV fixture. Subject to sales tax. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW)

148

Obama Administration Announces Additional $52,295,100 for Local...  

Energy Savers [EERE]

52,295,100 for Local Energy Efficiency Improvements in Maryland Obama Administration Announces Additional 52,295,100 for Local Energy Efficiency Improvements in Maryland March 26,...

149

Combined Heat and Power System Enables 100% Reliability at Leading...  

Broader source: Energy.gov (indexed) [DOE]

Enables 100% Reliability at Leading Medical Campus - Case Study, 2013 Combined Heat and Power System Enables 100% Reliability at Leading Medical Campus - Case Study, 2013 Thermal...

150

Four of Popular Science's 100 best innovations from Los Alamos...  

National Nuclear Security Administration (NNSA)

of Popular Science's 100 best innovations from Los Alamos, Sandia, Livermore Popular Science lists three of 100 best innovations from Los Alamos, Sandia Four of Popular Science's...

151

Measurement of Neutron and Muon Fluxes 100~m Underground with the SciBath Detector  

SciTech Connect (OSTI)

The SciBath detector is an 80 liter liquid scintillator detector read out by a three dimensional grid of 768 wavelength-shifting fibers. Initially conceived as a fine-grained charged particle detector for neutrino studies that could image charged particle tracks in all directions, it is also sensitive to fast neutrons (15-200 MeV). In fall of 2011 the apparatus performed a three month run to measure cosmic-induced muons and neutrons 100~meters underground in the FNAL MINOS near-detector area. Data from this run has been analyzed and resulted in measurements of the cosmic muon flux as \

Garrison, Lance

2014-01-01T23:59:59.000Z

152

Data:A936680f-384b-4b16-80d7-df79d35a4cfb | Open Energy Information  

Open Energy Info (EERE)

f-384b-4b16-80d7-df79d35a4cfb f-384b-4b16-80d7-df79d35a4cfb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mid-Kansas Electric Company, LLC (MKEC) Effective date: 2010/01/14 End date if known: Rate name: Private Area Light-100W(On New Pole-100% Cooperative Investment Option) Sector: Lighting Description: Unmetered Facilities. The average consumption per month is 40kWh Source or reference: Rate Binder #6, Illinois State University. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

153

ESH100.2.IH.13  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 Procedure Title Work with Injurious Corrosive Materials and Manage Safety Shower and Eyewash Use Procedure Manager HOOPER, LISA Z. Status Active Subject Matter Expert Ryann E. Washburn (Ryann Fisher) Maureen Mccullough Ainslie (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce who may be exposed to injurious corrosive materials and/or use safety showers and eyewashes at all Sandia-controlled premises. Exceptions to, or deviations from, this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure.

154

ESH100.2.IS.4  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 4 Procedure Title Implement Fall Prevention and Protection Procedure Manager FONG, DARRELL G. Status Active Subject Matter Expert Danny Donald Herman O. Armijo, Jr.-CA Contact Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce (on Sandia-controlled premises) whose activities include an exposure to fall hazards greater than 4 feet. Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

155

ESH100.2.IS.21  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 1 Procedure Title Manage Hazards for Overhead and Mobile Cranes and Hoists Procedure Manager FONG, DARRELL G. Status Active Subject Matter Expert Danny Donald-Subject Matter Expert Herman Armijo-CA Contact Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce who operate or supervise those who operate cranes or hoists. Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

156

ESH100.2.IH.8  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 8 Procedure Title Evaluate and Control Noise Hazards Procedure Manager HOOPER, LISA Z. Status Active Subject Matter Expert Brad Lackey Daniel Kuey (Dan) (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce who are exposed on Sandia-controlled premises to sources of noise hazards. Exceptions to, or deviations from, this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

157

ESH100.2.IS.12  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 Procedure Title Manage Earth Moving Equipment Procedure Manager FONG, DARRELL G. Status Active Subject Matter Expert Frederick Charles Shelly (Fred) Herman O. Armijo, Jr. (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all who operate, or oversee employees who operate earth moving equipment. Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

158

ESH100.2.IH.18  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 8 Procedure Title Synthesize, Import, Export, and Work with New Chemicals Procedure Manager HOOPER, LISA Z. Status Active Subject Matter Expert Eric Glassford Daniel Kuey (Dan)-CA Contact Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce whose activities involve synthesizing or working with new chemicals, or importing and exporting chemical substances on Sandia-controlled premises. This procedure does not apply to polychlorinated biphenyls (PCBs). Refer to ESH100.2.ENV.3, Manage PCBs, PCB Containers, and PCB Sources Safely. Exceptions to, or deviations from, this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policies, Processes, and Procedures.

159

ESH100.2.IS.10  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0 0 Procedure Title Manage Industrial Machine and Portable Power Tool Safety Procedure Manager FONG, DARRELL G. Status Active Subject Matter Expert David G. Sepulveda Herman O. Armijo, Jr.-CA Contact Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce who operate machinery that is classified as industrial machines, portable power tools, or industrial robot systems. Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure.

160

ESH100.2.ENV.16  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 Procedure Title Manage Radioactive Waste at SNL/CA Procedure Manager SHAMBER, GARY W. Status Active Subject Matter Expert Terry W. Cooper Janet S. Harris (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce at Sandia National Laboratories/CA (SNL/CA). Exceptions to, or deviations from, this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or procedure without authority, regardless of position or title, may be cause

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

ESH100.2.IS.17  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 Procedure Title Work Safely with Ladders, Scaffolds, and Elevating Work Platforms Procedure Manager FONG, DARRELL G. Status Active Subject Matter Expert Randolph Fellhoelter Herman O. Armijo, Jr. (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce whose work activities involve the use of ladders, scaffolds, and elevating work platforms. Exceptions to, or deviations from, this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure.

162

ESH100.2.ENV.23  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 Procedure Title Manage Radioactive Waste at SNL Procedure Manager JARRY, JEFFREY F. Status Active Subject Matter Expert Phillip W. Zelle (Phil) Janet S. Harris (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to Members of the Workforce primary waste generators who are responsible for generation and management of radioactive waste. Exceptions to, or deviations from, this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

163

ESH100.2.ENV.15  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 Procedure Title Manage Hazardous Waste at SNL/CA Procedure Manager SHAMBER, GARY W. Status Active Subject Matter Expert Janet S. Harris Terry W. Cooper Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce who perform waste handling, storage, transportation, processing, treatment, recovery, recycling, transfer, and disposal activities on Sandia-controlled premises within the State of California. Exceptions to, or deviations from, this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure.

164

ESH100.4.FI.1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 1 Procedure Title Perform ES&H Line Self-Assessment Activities Procedure Manager BENDURE, ALBERT O. Status Active Subject Matter Expert Robert S. Goetsch (Bob) Dennis J Beyer (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce who perform ES&H line self-assessment (SA) activities. Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

165

ESH100.2.IS.1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Procedure Title Work Safely in High Injury Potential/Remote Operations Procedure Manager FONG, DARRELL G. Status Active Subject Matter Expert Randolph Fellhoelter Herman O. Armijo, Jr.-CA Contact Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce who perform high-injury-potential-operations alone, in a normally unoccupied remote facility, or in a remote location. Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure.

166

ESH100.4.RPT.5  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 Procedure Title Report Vehicle Accidents and Property Damage Procedure Manager FONG, DARRELL G. Status Active Subject Matter Expert David G. Sepulveda Herman O. Armijo, Jr.-CA Contact Applicability, Exceptions, and Consequences This corporate procedure applies to all Sandia National Laboratories (SNL) organizations, all management elements, all SNL sites, and all Members of the Workforce. Exceptions to, or deviations from, this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

167

ESH100.2.IS.7  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 Procedure Title Implement Traffic Safety Procedure Manager FONG, DARRELL G. Status Active Subject Matter Expert David G. Sepulveda Herman O. Armijo, Jr.-CA Contact Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce and visitors: Whose activities on Sandia-controlled premises involve vehicles, motorized equipment, powered carts, bicycles, and pedestrians. Who operate government vehicles while on official Sandia business. Exceptions to, or deviations from, this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or

168

ESH100.2.ENV.24  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 4 Procedure Title Manage Mixed Waste at SNL Procedure Manager JARRY, JEFFREY F. Status Active Subject Matter Expert Phillip W. Zelle (Phil) Laura Tidwell (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce who are primary waste generators responsible for generation and management of mixed waste. Exceptions to, or deviations from, this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

169

ESH100.2.ELC.1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ELC.1 ELC.1 Procedure Title Manage Electrical Hazards Procedure Manager FONG, DARRELL G. Status Active Subject Matter Expert Marc Ellsworth Williams (Marc E) David R. Paoletta (Dave) (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce whose activities may result in a potential electrical hazard or exposure. Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

170

ESH100.2.IH.12  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 Procedure Title Control Food and Beverage Consumption in Hazardous Areas Procedure Manager HOOPER, LISA Z. Status Active Subject Matter Expert Michael Roth Maureen Mccullough Ainslie Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce who consume food and beverages in locations at Sandia-controlled premises. Exceptions to, or deviations from, this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policies, Processes, and Procedures. See CG100.1.7, Request Exceptions to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

171

ESH100.2.ENV.13  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 Procedure Title Control Ozone Depleting Substances Procedure Manager COOPER, TERRY W. Status Active Subject Matter Expert Joanna Lynn Eckstein Leslee P. Gardizi (Lee) (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce who use ozone-depleting substances (ODSs). Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or procedure without authority, regardless of position or title, may be cause

172

ESH100.2.FP.1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 1 Procedure Title Manage Fire Protection Requirements Procedure Manager D'ANTONIO, PERRY E. Status Active Subject Matter Expert Laura D. Draelos Aden C. Jackson (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Sandia National Laboratories (SNL) organizations, all management elements, all SNL sites, and all Members of the Workforce. Exceptions to, or deviations from, this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegatedview Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

173

ESH100.2.IS.22  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 Procedure Title Manage Hazards for Forklifts Procedure Manager FONG, DARRELL G. Status Active Subject Matter Expert Danny P. Donald Jeff H. Kokos Herman O. Armijo, Jr. (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce who operate or supervise those who operate forklifts. Exceptions to, or deviations from, this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

174

ESH100.4.RPT.7  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 Procedure Title Report on Safety and Security Regulatory Compliance Procedure Manager KING, GABRIEL G. Status Active Subject Matter Expert Gabriel G. King Applicability, Exceptions, and Consequences This corporate procedure applies to all Sandia National Laboratories (SNL) organizations, all management elements, all SNL sites, and all Members of the Workforce. Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

175

ESH100.2.IH.23  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 Procedure Title Evaluate and Control Thermal Stress Hazards Procedure Manager HOOPER, LISA Z. Status Active Subject Matter Expert Jared Mowrer Daniel Kuey (Dan)-CA Contact Applicability, Exceptions, and Consequences This corporate procedure applies to all Members of the Workforce whose work activities on Sandia-controlled premises may include exposure to thermal stressors that can lead to adverse health effects. Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure.

176

ESH100.1.EP.2  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 Procedure Title Implement NEPA, Cultural Resources, and Historic Properties Requirements Procedure Manager COOPER, TERRY W. Status Active Subject Matter Expert Joseph M. Bonaguidi (Joe) Barbara L. Larsen-SNL/CA Applicability, Exceptions, and Consequences This corporate procedure applies to all SNL organizations, all management elements, all SNL sites, all Members of the Workforce, and all SNL activities on private and government properties, as well as international settings. Exceptions to, or deviations from this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegated. Click here to view Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or

177

Vol. 39, No. 2APPLIED AND ENVIRONMENTAL MICROBIOLOGY, Feb. 1980, p. 302-306 0099-2240/80/02-0302/05$02.00/0  

E-Print Network [OSTI]

-2240/80/02-0302/05$02.00/0 Planktonic Marine Luminous Bacteria: Species Distribution in the Water Column E. G. RUBY,' t E. P. GREENBERG in abundance were detected: one in the upper 100 m of the water column, which consisted primarily of Beneckea in the spring and were not detected in the winter. Water samples from depths of 4,000 to 7,000 m contained less

McFall-Ngai, Margaret

178

Photo of the Week: Smashing Atoms with 80-ton Magnets | Department...  

Office of Environmental Management (EM)

Smashing Atoms with 80-ton Magnets Photo of the Week: Smashing Atoms with 80-ton Magnets April 11, 2014 - 1:32pm Addthis The cyclotron, invented by Ernest Lawrence in the 1930s, is...

179

E-Print Network 3.0 - api 5l x80 Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

x80 Search Powered by Explorit Topic List Advanced Search Sample search results for: api 5l x80 Page: << < 1 2 3 4 5 > >> 1 A Framework for Diversifying Windows Native APIs to...

180

WINDExchange: Utility-Scale Land-Based 80-Meter Wind Maps  

Wind Powering America (EERE)

Programs & Data Utility-Scale Land-Based 80-Meter Wind Maps The U.S. Department of Energy provides an 80-meter (m) height, high-resolution wind resource map for the United...

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

The Ohmic heating of a spheromak to 100 eV  

Science Journals Connector (OSTI)

The first spheromaks with Thomson?scattering?measured electron temperatures of over 100 eV are described. The spheromak is generated by a magnetized coaxial plasma source in a background gas of 30 mTorr of H2 and it is stably confined in an oblate 80 cm diam copper mesh flux conserver. The open mesh design allows rapid impurity transport out of the spheromak. The peak temperature measured using multipoint Thomson scattering is observed to rise from approximately 25 eV to over 100 eV in about 0.2 msec due to Ohmic heating from the decaying magnetic fields. Density (?5101 3 cm? 3) and magnetic fields (approximately 2 kG) are measured using interferometry and magnetic probes.

T. R. Jarboe; Cris W. Barnes; I. Henins; H. W. Hoida; S. O. Knox; R. K. Linford; A. R. Sherwood

1984-01-01T23:59:59.000Z

182

Two neutrino double ? decay of 100Mo to the 2+ excited state of 100Ru  

Science Journals Connector (OSTI)

The two neutrino double ? decay of 100Mo for 0+?2+ transition is studied in the projected Hartree-Fock-Bogoliubov framework. In our earlier work, the reliability of the intrinsic wave functions has been established for 100Mo and 100Ru by obtaining an overall agreement between the available experimental data and theoretically calculated results for yrast spectra, reduced transition probabilities B(E2:0+?2+), quadrupole moments Q(2+), gyromagnetic factors g(2+), and double Gamow-Teller matrix element for 0+?0+ transition. In the present work, the half-life for 0+?2+ transition T1/22?(0+?2+) has been calculated using the same set of intrinsic wave functions.

K. Chaturvedi, B. M. Dixit, P. K. Rath, and P. K. Raina

2003-06-27T23:59:59.000Z

183

Solar Energy, 2006, 80, 3, 361-367 SIMULATING METEOSAT-7 BROADBAND RADIANCES USING TWO  

E-Print Network [OSTI]

Solar Energy, 2006, 80, 3, 361-367 SIMULATING METEOSAT-7 BROADBAND RADIANCES USING TWO VISIBLE-00361360,version1-13Feb2009 Author manuscript, published in "Solar Energy 80, 3 (2006) 361-367" DOI : 10.1016/j.solener.2005.01.012 #12;Solar Energy, 2006, 80, 3, 361-367 · Imet-7 the maximum irradiance

Paris-Sud XI, Université de

184

Role of Delamination and Crystallography on Anisotropy of Charpy toughness in API-X80 steel  

E-Print Network [OSTI]

Role of Delamination and Crystallography on Anisotropy of Charpy toughness in API-X80 steel M. S dependence of Charpy toughness has been investigated in API-X80 linepipe steel. The occurrence the origin of anisotropy in Charpy energy in API-X80 linepipe steel, as a function of test temperature

Cambridge, University of

185

Nevada: Kingston Creek Hydro Project Powers 100 Households  

Broader source: Energy.gov [DOE]

Hydropower project produces enough electricity to annually power nearly 100 typical American households.

186

Using an 80% CF4+20% CO2 gas mixture to recover aged anode wires in proportional chambers  

Science Journals Connector (OSTI)

A technique to recover a gas proportional counter with an aged anode wire using a glow discharge in an 80%CF4+20%CO2 gas mixture, has been developed and tested. Studies of aging effects were carried out under sustained irradiation by an intense 90Sr ?-source of straw proportional counters operated with a 60%Ar+30%CO2+10%CF4 gas mixture. Special attention was paid to the aging mechanism of the anode wires. Our experience showed that using a given gas mixture the swelling of the anode wires is a typical mode of aging that leads to degradation of the gas gain. The proposed method restores the gas gain and the signal amplitude in the damaged zone of the wire. SEM/XEM analysis confirmed that the tungsten oxide deposits have been removed.

G.E. Gavrilov; D.A. Aksenov; R. Conti; A.A. Fetisov; A.G. Krivchitch; D.A. Maysuzenko; N.Yu. Shvecova; V.M. Vakhtel

2012-01-01T23:59:59.000Z

187

PP-60 Northern Electric Cooperative Association (NEC) | Department...  

Broader source: Energy.gov (indexed) [DOE]

0 Northern Electric Cooperative Association (NEC) PP-60 Northern Electric Cooperative Association (NEC) Presidential Permit authorizing Northern Electric Cooperative Association...

188

JT-60 Modification Plan for Long Pulse Advanced Tokamak Research  

E-Print Network [OSTI]

JT-60 Modification Plan for Long Pulse Advanced Tokamak Research Colloquium of Max Planck Institute as one step to DEMO · Advanced tokamak researches · Scientific achievements of JT-60 and its phase Tokamak Commercializa tion pease JT-60 Decision system of prototype reactor Electricity Generation

189

Laser Induced Breakdown Spectroscopy and Applications Toward Thin Film Analysis  

E-Print Network [OSTI]

1.5 Laserb) 60 shots, (c) 80 shots, and (d) 100 shots with 60mJ laserAutofocusing . . . . . . . . . . 2.4 Laser and Spectrometer

Owens, Travis Nathan

2011-01-01T23:59:59.000Z

190

Figura_10_color.eps  

E-Print Network [OSTI]

20. 40. 60. 80. 100. 120. 140. 30. 60. 90. 0. 1000/Q (X). 1000/Q (Z). Patchy saturated medium. with fractures10% saturation. Patchy saturated medium.

191

Functionalization of [60]fullerene by photoinduced electron transfer (PET): Syntheses of 1-substituted 1,2-dihydro[60]fullerenes  

Science Journals Connector (OSTI)

[60]Fullerene is irradiated in the presence of the electron transfer sensitizer 9,10-dicyanoanthracene (DCA) under cosensitization with biphenyl. The generated radical cation C60+ reacts with H-donors such as tert-butylmethyl ether, propionaldehyde and alcohols to give 1:1-adducts, the 1-substituted 1,2-dihydro[60]fullerenes.

Christina Siedschlag; Heinrich Luftmann; Christian Wolff; Jochen Mattay

1997-01-01T23:59:59.000Z

192

Data:Ab43dcc9-7038-4e96-b8ff-1f5fff80ef49 | Open Energy Information  

Open Energy Info (EERE)

Ab43dcc9-7038-4e96-b8ff-1f5fff80ef49 Ab43dcc9-7038-4e96-b8ff-1f5fff80ef49 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Perennial Public Power Dist Effective date: 2013/01/01 End date if known: Rate name: URBAN RESIDENTIAL (Rate Code 23) Sector: Residential Description: AVAILABILITY: To residential customers within the corporate limits of the municipalities served by the District. The entire residential service, including any electric space heating and/or water heating service, must be taken through a single meter. TYPE OF SERVICE: A.C., 60 cycles, single-phase or three-phase at any of the District's standard voltages.

193

Ground state proton capture reactions from 20 to 100 MeV  

Science Journals Connector (OSTI)

Proton capture reactions on targets of B11, C12, N15, O16, and Al27 were measured from Ep=20 to 100 MeV. The energy dependence of the ??=60 differential cross sections are presented for captures populating the ground states of C12, N13, O16, F17, and Si28. Differential-cross-section and analyzing-power angular distributions are presented at bombarding energies of Ep=20.8, 28.35, 49.2, and 49.69 MeV. Calculations from two capture-reaction models are compared to the data.

H. J. Hausman; S. L. Blatt; T. R. Donoghue; J. Kalen; W. Kim; D. G. Marchlenski; T. W. Rackers; P. Schmalbrock; M. A. Kovash; A. D. Bacher

1988-02-01T23:59:59.000Z

194

Magnetization of uncovered and V-covered ultrathin Fe(100) films on V(100)  

SciTech Connect (OSTI)

We used polarized neutron reflectometry (PNR) to determine the absolute magnetic moment of uncovered and V-covered Fe films in the thickness range from 0.3 to 5.5 nm. The films were prepared by molecular beam epitaxy on a V(100) buffer layer grown on a MgO(100) crystal. The magnetic moment shows a linear dependence on the Fe film thickness with a reduction (compared to the Fe bulk value) of the magnetic moment equivalent to 0.1 nm bulk Fe for the V-covered films and a reduction equivalent to 0.03 nm bulk Fe for the uncovered Fe films. For the case of the V/Fe/V samples we observe a much smaller reduction of the magnetic moment than reported for experiments on Fe/V multilayers. As theoretical calculations show a strong decrease of the magnetic moment for an interface alloy we conclude that the larger reduction of the magnetization in Fe/V multilayers is due to an increase in interface roughness with increasing film thickness. For the uncovered Fe(100) films we find a much smaller reduction of the magnetic moment than in earlier in situ PNR experiments on V(110)/Fe(110) where we observed a reduction equivalent to 0.4 nm bulk Fe.

Fritzsche, H.; Liu, Y.T.; Hauschild, J.; Maletta, H. [National Research Council Canada, SIMS, NPMR, Chalk River Labs, Bldg. 459, Chalk River, ON, K0J 1J0 (Canada); Hahn-Meitner-Institut, Glienicker Strasse 100, 14109 Berlin (Germany)

2004-12-01T23:59:59.000Z

195

Experience with the EM-60 electromagnetic system for geothermal exploration in Nevada  

SciTech Connect (OSTI)

Lawrence Berkeley Laboratory (LBL) conducted controlled-source electromagnetic (EM) surveys at three geothermal prospects in northern Nevada. Over 40 soundings were made in Panther Canyon (Grass Valley), near Winnemucca; Soda Lakes, near Fallon; and McCoy, west of Austin, to test and demonstrate the applicability of LBL's EM-60 system to geothermal exploration. The EM-60 is a frequency-domain system using three-component magnetic detection. Typically, +-65 A is applied to an 100-m-diameter four-turn horizontal loop, generating a dipole moment >10/sup 6/ MKS over the frequency range 10/sup -3/ to 10/sup -3/ Hz. With such a source loop, soundings were made, at transmitter-receiver separations of up to 4 km, providing a maximum depth of penetration of 4 km.

Wilt, M.; Goldstein, N.E.; Stark, M.; Haught, J.R.; Morrison, H.F.

1981-09-01T23:59:59.000Z

196

Physics design of a 100 keV acceleration grid system for the diagnostic neutral beam for international tokamak experimental reactor  

SciTech Connect (OSTI)

This paper describes the physics design of a 100 keV, 60 A H{sup -} accelerator for the diagnostic neutral beam (DNB) for international tokamak experimental reactor (ITER). The accelerator is a three grid system comprising of 1280 apertures, grouped in 16 groups with 80 apertures per beam group. Several computer codes have been used to optimize the design which follows the same philosophy as the ITER Design Description Document (DDD) 5.3 and the 1 MeV heating and current drive beam line [R. Hemsworth, H. Decamps, J. Graceffa, B. Schunke, M. Tanaka, M. Dremel, A. Tanga, H. P. L. De Esch, F. Geli, J. Milnes, T. Inoue, D. Marcuzzi, P. Sonato, and P. Zaccaria, Nucl. Fusion 49, 045006 (2009)]. The aperture shapes, intergrid distances, and the extractor voltage have been optimized to minimize the beamlet divergence. To suppress the acceleration of coextracted electrons, permanent magnets have been incorporated in the extraction grid, downstream of the cooling water channels. The electron power loads on the extractor and the grounded grids have been calculated assuming 1 coextracted electron per ion. The beamlet divergence is calculated to be 4 mrad. At present the design for the filter field of the RF based ion sources for ITER is not fixed, therefore a few configurations of the same have been considered. Their effect on the transmission of the electrons and beams through the accelerator has been studied. The OPERA-3D code has been used to estimate the aperture offset steering constant of the grounded grid and the extraction grid, the space charge interaction between the beamlets and the kerb design required to compensate for this interaction. All beamlets in the DNB must be focused to a single point in the duct, 20.665 m from the grounded grid, and the required geometrical aimings and aperture offsets have been calculated.

Singh, M. J. [ITER-India, Institute for Plasma Research, Bhat, Gandhinagar, Gujarat 382428 (India); De Esch, H. P. L. [CEA-Cadarache, IRFM, F-13108 Saint-Paul-lez-Durance (France)

2010-01-15T23:59:59.000Z

197

Data:5acb3b2c-0e55-48f9-80ed-3c80c195f680 | Open Energy Information  

Open Energy Info (EERE)

b2c-0e55-48f9-80ed-3c80c195f680 b2c-0e55-48f9-80ed-3c80c195f680 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lebanon, Indiana (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: OL - Outdoor Lighting 150 watt sodium vapor Sector: Lighting Description: Availability Available only for continuous year-round service for outdoor lighting to any residential, farm, commercial or industrial customer located adjacent to an electric distribution line of Utility. Character of Service Outdoor Lighting Service using lamps available under this schedule. Source or reference: http://www.lebanon-utilities.com/e_rates.html

198

Policy Flash 2011-100 | Department of Energy  

Office of Environmental Management (EM)

00 Policy Flash 2011-100 The Department issued Contractor Requirements Documents (CRDs) for the subject Directives on August 30, 2011. PolicyFlash2011-100.pdf More Documents &...

199

Microsoft Word - N01673_B100 AA final draft  

Office of Legacy Management (LM)

Draft Building 100 Area Draft Building 100 Area Plume Management Alternatives Analysis March 2012 LMS/PIN/N01673 This page intentionally left blank LMS/PIN/N01673 Pinellas County, Florida, Site Environmental Restoration Project Draft Building 100 Area Plume Management Alternatives Analysis March 2012 This page intentionally left blank U.S. Department of Energy Draft Building 100 Area Plume Management Alternatives Analysis March 2012 Doc. No. N01673 Page i Contents Abbreviations ................................................................................................................................. iv Executive Summary .........................................................................................................................v

200

Microsoft Word - N01747_Bldg 100 SAR.doc  

Office of Legacy Management (LM)

Building 100 Area Site Assessment Report August 2012 LMS/PIN/N01747 This page intentionally left blank LMS/PIN/N01747 Pinellas County, Florida, Site Building 100 Area Site Assessment Report August 2012 This page intentionally left blank U.S. Department of Energy Building 100 Area Site Assessment Report August 2012 Doc. No. N01747 Page i Contents Abbreviations ................................................................................................................................. iii

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Startup, Commissioning and Operation of Fenyi 100MW CFB Boiler  

Science Journals Connector (OSTI)

The first 100MW CFB boiler, designed by the Thermal Power Research ... burn out are used in the 100 MW CFB boiler. The results of the 100MW CFB boiler shows that the CFB boiler can run in 30% MCR and ... got afte...

Zhiwei Wang; Wugao Yu; Shi Bo

2010-01-01T23:59:59.000Z

202

MATH 100 Introduction to the Profession Introduction to MATLAB  

E-Print Network [OSTI]

MATH 100 ­ Introduction to the Profession Introduction to MATLAB Greg Fasshauer Department;MATLAB Introductory Material MATLAB Guides Quite a bit of introductory material is posted online at http://math.iit.edu/fass/100.html. fasshauer@iit.edu MATH 100 ­ ITP 2 #12;MATLAB Introductory Material MATLAB Guides Quite

Fasshauer, Greg

203

Number Percent Official Lawrence HC 26,934 100%  

E-Print Network [OSTI]

Lawrence Free State 134 Blue Valley Northwest 117 Blue Valley North 109 Lawrence 94 Saint Thomas Aquinas 90 Olathe East 80 Shawnee Mission Northwest 78 Shawnee Mission South 75 Shawnee Mission West 71 Total 990

204

Data:961a24cd-0ddb-4b12-afb7-80b14500aebd | Open Energy Information  

Open Energy Info (EERE)

a24cd-0ddb-4b12-afb7-80b14500aebd a24cd-0ddb-4b12-afb7-80b14500aebd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2006/08/01 End date if known: Rate name: Street/Lighting Rate Schedules HPSV NW-1 Sector: Lighting Description: Applicable to electric service for the operation of overhead automatically controlled all night outdoor lighting service for lighting private streets, alleys, or any area of the premises. The lighting fixture shall be a luminaire with outer globe open bottom with a high pressure sodium vapor lamp rated at approximately 100 watts, with control device, mounted on a bracket or mastarm approximately 30 inches , as available, erected on Company owned or controlled poles where the fixtures and equipment are owned, maintained, and serviced by the Company

205

E-Print Network 3.0 - alloy nimonic 80a Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

scattering limited transport of two-dimensional carriers in strained Si, -,Ge, quantum wells Summary: spacer widths ( > 80 A), electron mobilities in pure Si channels grown in our...

206

Climatic Change (2007) 80:369377 DOI 10.1007/s10584-006-9135-1  

E-Print Network [OSTI]

-mail: qbzhang@ibcas.ac.cn Springer #12;370 Climatic Change (2007) 80:369­377 global climate change (Sun

Zhang, Qi-Bin

207

R&D100 Winners * Impacts on Global Technology  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

R&D100 Winners * Impacts on Global Technology R&D100 Winners * Impacts on Global Technology OUTSIDE FRONT COVER 2 SANDIA NATIONAL LABOR ATORIES 3 R&D100 Winners * Impacts on Global Technology For further information, contact: Henry R. Westrich LDRD Program Manager hrwestr@sandia.gov 505-844-9092 ABOUT THE COVER: Representative images from the R&D100- winning technologies in this brochure, all with their roots in Sandia Laboratory Directed Research and Development (LDRD). 4 SANDIA NATIONAL LABOR ATORIES 5 R&D100 Winners * Impacts on Global Technology Contents More-sophisticated Silicon Br ains

208

USS Nautilus 60th Anniversary | National Nuclear Security Administrati...  

National Nuclear Security Administration (NNSA)

USS Nautilus 60th Anniversary | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering...

209

Non-IPR C{sub 60} solids  

SciTech Connect (OSTI)

Films comprising predominantly novel isomers of C{sub 60} [=C{sub 60}(nIPR)] have been generated by low energy ion beam deposition of vibronically excited C{sub 60}{sup +} onto graphite followed by selective sublimation of C{sub 60}(I{sub h}) from the deposited isomer mixture. The incident ions were generated by electron impact ionization/fragmentation of sublimed C{sub 70}. Images of the C{sub 60}(nIPR) films obtained by applying atomic force microscopy show aggregates, which we attribute to covalently interlinked C{sub 60}(nIPR) units. The covalent bonds are inferred from the significantly higher thermal stability of the C{sub 60}(nIPR) films compared to the C{sub 60}(I{sub h}) van der Waals solid-as measured by thermal desorption with mass spectrometric detection of the C{sub 60} mass channel (the only desorbable species). In contrast to the characteristic doublet structure of the occupied valence band in the ultraviolet photoelectron spectrum of pure C{sub 60}(I{sub h}), the valence band of C{sub 60}(nIPR) films exhibits a triplet feature with the additional peak occurring at a binding energy of {approx}2.6 eV. This is an indicator of the electronic modifications induced by intermolecular bonding. C{sub 60}(nIPR) films exhibit a narrower band gap than found for C{sub 60}(I{sub h}). They also have significantly different chemical reactivity toward incorporation of thermal energy deuterium atoms. In order to model the experimental photoelectron spectra, various covalently linked oligomers of {sup 1809}C{sub 60}(C{sub 2v}), the second most stable conventional 60-atom fullerene cage, were calculated by means of the density functional theory. These spectral predictions together with analogous previous observations on related fullerene solids such as C{sub 58} lead us to infer that C{sub 60}(nIPR) films consist of fullerene cage isomers containing one or more adjacent pentagon pairs, which mediate covalent cage-cage interconnection.

Loeffler, Daniel; Cudaj, Marcus; Weis, Patrick; Boettcher, Artur [Lehrstuhl Physikalische Chemie Mikroskopischer Systeme, Institut fuer Physikalische Chemie, Universitaet Karlsruhe, 76131 Karlsruhe (Germany); Bajales, Noelia [Universidad Nacional del Litoral-CONICET, Gueemes 3450 C. P. 3000 Santa Fe (Argentina); Lebedkin, Sergei [Institut fuer Nanotechnologie, Forschungszentrum Karlsruhe, D-76021 Karlsruhe (Germany); Bihlmeier, Angela; Tew, David P.; Klopper, Wim [Lehrstuhl Theoretische Chemie, Institut fuer Physikalische Chemie, Universitaet Karlsruhe, 76131 Karlsruhe (Germany); Kappes, Manfred M. [Lehrstuhl Physikalische Chemie Mikroskopischer Systeme, Institut fuer Physikalische Chemie, Universitaet Karlsruhe, 76131 Karlsruhe (Germany); Institut fuer Nanotechnologie, Forschungszentrum Karlsruhe, D-76021 Karlsruhe (Germany)

2009-04-28T23:59:59.000Z

210

High reliability low jitter 80kV pulse generator  

Science Journals Connector (OSTI)

Switching can be considered to be the essence of pulsed power. Time accurate switch/trigger systems with low inductance are useful in many applications. This article describes a unique switch geometry coupled with a low-inductance capacitive energy store. The system provides a fast-rising high voltage pulse into a low impedance load. It can be challenging to generate high voltage (more than 50kilovolts) into impedances less than 10???, from a low voltage control signal with a fast rise time and high temporal accuracy. The required power amplification is large, and is usually accomplished with multiple stages. The multiple stages can adversely affect the temporal accuracy and the reliability of the system. In the present application, a highly reliable and low jitter trigger generator was required for the Z pulsed-power facility [M.?E. Savage, L.?F. Bennett, D.?E. Bliss, W.?T. Clark, R.?S. Coats,J.?M. Elizondo, K.?R. LeChien, H.?C. Harjes, J.?M. Lehr, J.?E. Maenchen, D.?H. McDaniel, M.?F. Pasik, T.?D. Pointon, A.?C. Owen, D.?B. Seidel, D.?L. Smith, B.?S. Stoltzfus, K.?W. Struve, W.?A. Stygar, L.?K. Warne, and J.?R. Woodworth, 2007 IEEE Pulsed Power Conference, Albuquerque, NM (IEEE, Piscataway, NJ, 2007), p.979]. The large investment in each Z experiment demands low prefire probability and low jitter simultaneously. The system described here is based on a 100kV DC-charged high-pressure spark gap, triggered with an ultraviolet laser. The system uses a single optical path for simultaneously triggering two parallel switches, allowing lower inductance and electrode erosion with a simple optical system. Performance of the system includes 6ns output rise time into 5.6???, 550ps one-sigma jitter measured from the 5V trigger to the high voltage output, and misfire probability less than 10-4. The design of the system and some key measurements will be shown in the paper. We will discuss the design goals related to high reliability and low jitter. While reliability is usually important, and is coupled with jitter, reliability is seldom given more than a qualitative analysis (if any at all). We will show how reliability of the system was calculated, and results of a jitter-reliability tradeoff study. We will describe the behavior of sulfur hexafluoride as the insulating gas in the mildly nonuniform field geometry at pressures of 300 to 500kPa. We will show the resistance of the arc channels, and show the performance comparisons with normal two-channel operation, and single channel operation.

M. E. Savage and B. S. Stoltzfus

2009-08-27T23:59:59.000Z

211

Groundwater impact assessment report for the 100-D Ponds  

SciTech Connect (OSTI)

The 183-D Water Treatment Facility (WTF) discharges effluent to the 120-0-1 Ponds (100-D Ponds) located north of the 100-D Area perimeter fence. This report satisfies one of the requirements of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-17-00B as agreed by the US Department of Energy, Washington State Department of Ecology, and the US Environmental Protection Agency. Tri-Party Agreement Milestone M-17-00B includes a requirement to assess impacts to groundwater from disposal of the 183-D WTF effluent to the 100-D Ponds. In addition, the 100-D Ponds are a Resource Conservation and Recovery Act of 1976 treatment, storage, and disposal facility covered by the 100-D Ponds Closure Plan (DOE-RL 1993a). There is evidence of groundwater contamination, primarily nitrate, tritium, and chromium, in the unconfined aquifer beneath the 100-D Area and 100 Areas in general. The contaminant plumes are area wide and are a result of past-practice reactor and disposal operations in the 100-D Area currently being investigated as part of the 100-DR-1 and 100-HR-3 Operable Units (DOE-RL 1992b, 1992a). Based on current effluent conditions, continued operation of the 100-D Ponds will not adversely affect the groundwater quality in the 100-D Area. Monitoring wells near the pond have slightly higher alkaline pH values than wells in the rest of the area. Concentrations of known contaminants in these wells are lower than ambient 100-D Area groundwater conditions and exhibit a localized dilution effect associated with discharges to the pond. Hydraulic impact to the local groundwater system from these discharges is minor. The groundwater monitoring well network for the 100-D Ponds is adequate.

Alexander, D.J.

1993-07-01T23:59:59.000Z

212

Data:D848af5b-4475-4a42-80fd-7835dc1b5e35 | Open Energy Information  

Open Energy Info (EERE)

8af5b-4475-4a42-80fd-7835dc1b5e35 8af5b-4475-4a42-80fd-7835dc1b5e35 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2010/11/01 End date if known: Rate name: AREA LIGHTING SPECIAL RATE FOR LIGHTS - Area Lights 200w Sector: Lighting Description: "SPECIAL RATE FOR LIGHTS CONNECTED BEHIND CUSTOMER'S METER" Available to all customers for dusk to dawn outdoor area lighting not served under street lighting contract. Service under this schedule is also available for television amplifiers for cable systems, and other flat rate services. Special Poles $ 1.00 per month

213

Data:9e34e8b1-ad63-4a80-aaab-a6c228c0781b | Open Energy Information  

Open Energy Info (EERE)

e8b1-ad63-4a80-aaab-a6c228c0781b e8b1-ad63-4a80-aaab-a6c228c0781b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clay Electric Cooperative, Inc Effective date: 2011/01/01 End date if known: Rate name: Rate Schedule - LGSDT/LM Sector: Industrial Description: At the option of the consumer, to electric service which would otherwise be provided under the Cooperative's Schedule LGSD. Renewable generating systems are not to be rated higher than 100 kW AC for the purpose of net metering. Source or reference: https://www.clayelectric.com/rates.aspx Source Parent: Comments Plus current month's Power Cost Adjustment and applicable taxes.

214

Data:533b8c71-76e3-4d95-ae80-9bf54a8b619c | Open Energy Information  

Open Energy Info (EERE)

-76e3-4d95-ae80-9bf54a8b619c -76e3-4d95-ae80-9bf54a8b619c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Trico Electric Cooperative Inc Effective date: 2009/08/01 End date if known: Rate name: General Service TOU Three-Phase Primary Discount Sector: Commercial Description: *This rate is limited to the first 100 qualified customers. Subject to tax and power cost adjustment. Source or reference: http://www.trico.coop/images/TRICO_GSTOU.pdf Source Parent: Comments Delivery of power at primary voltage will be billed with a three percent (3%) discount given on all demand and energy charges.

215

Data:C21af719-0dfa-402d-a80c-77d90d969418 | Open Energy Information  

Open Energy Info (EERE)

19-0dfa-402d-a80c-77d90d969418 19-0dfa-402d-a80c-77d90d969418 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co Effective date: 2011/10/01 End date if known: Rate name: OUTDOOR LIGHTING MH-8 100 W Sector: Lighting Description: RULES AND REGULATIONS: Terms and conditions of this electric rate schedule and the General Rules and Regulations govern use of this service. APPLICATION OF SCHEDULE: This schedule is applicable to any Customer for automatically operated dusk to dawn outdoor lighting supplied and operated by the Company. Source or reference: https://www.otpco.com/RatesPricing/Documents/PDF/MN/MN_11.04.pdf

216

Data:25e995d7-e626-45e7-9021-691f0fb80c34 | Open Energy Information  

Open Energy Info (EERE)

d7-e626-45e7-9021-691f0fb80c34 d7-e626-45e7-9021-691f0fb80c34 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shelby Energy Co-op, Inc Effective date: 2011/06/01 End date if known: Rate name: 100 Watt Decorative Colonial Light Sector: Lighting Description: Source or reference: http://www.shelbyenergy.com/yourelectricrate.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

217

Data:1b2efb80-964b-4853-add3-c2cf5221b66f | Open Energy Information  

Open Energy Info (EERE)

efb80-964b-4853-add3-c2cf5221b66f efb80-964b-4853-add3-c2cf5221b66f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Residential Service Single-Phase Sector: Residential Description: This rate will be applied to residential single-phase customers for ordinary household purposes. Single-phase motors may not exceed 5 horsepower individual-rated capacity without utility permission. Rg-1 Residential Service $1.00 per customer per month Source or reference: http://www.algomautilities.com/media/Electric_Rate_Tariff_Sheets.pdf

218

Data:43ee29ba-da4b-493f-bd80-2c9916a514d1 | Open Energy Information  

Open Energy Info (EERE)

9ba-da4b-493f-bd80-2c9916a514d1 9ba-da4b-493f-bd80-2c9916a514d1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers Electric Company, Ltd Effective date: 2012/06/01 End date if known: Rate name: Street Lights- 100W High Pressure Sodium- Fiberglass Pole Sector: Lighting Description: Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

219

Data:48e9de8b-8a00-4582-8069-ec9dcd80b1e3 | Open Energy Information  

Open Energy Info (EERE)

8a00-4582-8069-ec9dcd80b1e3 8a00-4582-8069-ec9dcd80b1e3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wake Electric Membership Corp Effective date: 2013/01/01 End date if known: Rate name: Outdoor Lighting Service - Sodium Vapor Units 100 Watt - Enclosed Sector: Lighting Description: Available in all territory served by the Cooperative subject to the established Service Rules and Regulations of the Cooperative. Source or reference: www.wemc.com/documents/RATESCHEDULE2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

220

Data:Bcfa5683-5fb1-4b80-8b40-fab9d663dad3 | Open Energy Information  

Open Energy Info (EERE)

Bcfa5683-5fb1-4b80-8b40-fab9d663dad3 Bcfa5683-5fb1-4b80-8b40-fab9d663dad3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Hemingford, Nebraska (Utility Company) Effective date: 2012/10/01 End date if known: 2013/09/30 Rate name: General Service Demand Sector: Commercial Description: To business accounts having a demand in excess of 100 kW for three (3) consecutive months. To energy used by electric motors in excess of one hundred (100) horsepower or other power equipment in excess of one (100) kW to be metered separate from other service having a highly fluctuating or large instantaneous demand.

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Data:9f46e5c5-458c-4864-80f3-026768cb761f | Open Energy Information  

Open Energy Info (EERE)

6e5c5-458c-4864-80f3-026768cb761f 6e5c5-458c-4864-80f3-026768cb761f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Holyoke, Massachusetts (Utility Company) Effective date: 2009/08/12 End date if known: Rate name: GENERAL SERVICE ELECTRIC SCHEDULE (INDUSTRIAL) Sector: Industrial Description: Additional Info: Following rate(s) apply: First 200 Hrs. Times Demand First 3,000 kWh at .1181 per kWh Next 12,000 kWh at .1096 per kWh Next 85,000 kWh at .1033 per kWh All over 100,000 kWh at .0949 per kWh Next 200 Hrs. Times Demand (100 KW Minimum) at .0878 per kWh All over 400 Hrs. Times Demand (100 KW Minimum) at .0728 per kWh

222

Solid-State Lighting: IESNA LM-80-08 - An Overview of the Test Procedure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IESNA LM-80-08 - An Overview IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® to someone by E-mail Share Solid-State Lighting: IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® on Facebook Tweet about Solid-State Lighting: IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® on Twitter Bookmark Solid-State Lighting: IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® on Google Bookmark Solid-State Lighting: IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® on Delicious Rank Solid-State Lighting: IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® on Digg Find More places to share Solid-State Lighting: IESNA LM-80-08 -

223

ORNL/TM-2000/80 Geothermal Heat Pumps in K12  

E-Print Network [OSTI]

ORNL/TM-2000/80 Geothermal Heat Pumps in K­12 Schools A Case Study of the Lincoln, Nebraska Government or any agency thereof. #12;ORNL/TM-2000/80 Geothermal Heat Pumps in K­12 Schools A Case Study DE-AC05-00OR22725 #12;Geothermal Heat Pumps in K­12 Schools iii CONTENTS List of Figures

Oak Ridge National Laboratory

224

Sun Ultra 80 SPEC CFP95 Sun Forte Inter-Array Padding for Data Localization  

E-Print Network [OSTI]

Sun Ultra 80 SPEC CFP95 Sun Forte 5.5 Inter-Array Padding for Data Localization with Static for data localization to minimize cache conflict misses. In the evaluation on Sun Ultra 80 using SPEC CFP95, the OSCAR multigrain compiler gave us up to 5.5 times speedup against Sun Forte automatic paralleling

Kasahara, Hironori

225

Data:3b4f7580-5d6f-447d-a98d-0cb60d3474de | Open Energy Information  

Open Energy Info (EERE)

80-5d6f-447d-a98d-0cb60d3474de 80-5d6f-447d-a98d-0cb60d3474de No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bristol, Tennessee (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Lighting Service- LS (Standard Light)(175 W Mercury Vapor) Sector: Lighting Description: Source or reference: http://www.btes.net/index.php/electric/general-electric-rates-old/lighting-service-rate-schedule/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

226

58 59 60 61 62 63 57 58 59 60 61 62 63  

E-Print Network [OSTI]

Trachy- basalt Tephrite Basanite Phono- Tephrite Tephri- phonolite Phonolite Foidite MI-REMS-CLPX MI-REMS-SAN MI-REBA-CLPX MI-REBA-SAN MI-REBA-PLG MI-REMS-ILM .1 1 10 100 1000 Sr K Rb Ba Th Ta Nb Ce P Zr Hf Sm Ti Y Yb Rock/MORB Pearce 1983 MI-REMS-CLPX MI-REMS-SAN MI-REBA-CLPX MI-REBA-SAN MI-REBA-PLG MI-REMS-ILM 15000 20000 25000

Bodnar, Robert J.

227

Berkeley Lab: 80 Years of Excellence in Science | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Berkeley Lab: 80 Years of Excellence in Science Berkeley Lab: 80 Years of Excellence in Science Berkeley Lab: 80 Years of Excellence in Science September 2, 2011 - 11:45am Addthis Berkeley Lab: 80 Years of Excellence in Science Kate Bannan Communications and Outreach Specialist Congratulations to Lawrence Berkeley National Laboratory, which celebrated its 80th anniversary on August 26. Berkeley Lab was founded in 1931 by Ernest Orlando Lawrence, a University of California Berkeley physicist who won the 1939 Nobel Prize in physics for his invention of the cyclotron, a circular particle accelerator that opened the door to high-energy physics. It was Lawrence's belief that scientific research is best done through teams of individuals with different fields of expertise working together. His teamwork concept is a Berkeley Lab legacy that continues today.

228

National Methods Comparison for Mongolia  

E-Print Network [OSTI]

RIAH Hydro-Met JER %Basalcover #12;JER Basal cover 0 20 40 60 80 100 Meteorologycover 0 20 40 60 80 100 (Small diameter pin) (Largediameterrods) #12;JER Basal cover 0 5 10 15 20 25 30 RIBBasalcoverofplantssummed 0 5 10 15 20 25 30 (Small diameter pin) (Smalldiameterpin) #12;RIB Basal cover 0 20 40 60 80

229

Data:E8126f5f-f2f8-415c-923f-80a85ff81e67 | Open Energy Information  

Open Energy Info (EERE)

26f5f-f2f8-415c-923f-80a85ff81e67 26f5f-f2f8-415c-923f-80a85ff81e67 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Orange & Rockland Utils Inc Effective date: 2013/07/01 End date if known: Rate name: SC1 Residential (Multiple Bills, Retail Service) Sector: Description: Residential Customers: Continuous, 60 cycles, A.C., from any one of the following systems as designated by the Company: (a) Single phase at approximately 120, 120/208 or 120/240 Volts. (b) Three phase four wire at approximately 120/208 Volts in limited areas. Other Customers Eligible for Residential Service as Defined in General Information Section No. 8: Continuous, 60 cycles, A.C., single or three phase secondary, or three phase primary as defined in General Information Section No. 4.

230

Microsoft Word - N01535_B100 Plume Delin Rpt  

Office of Legacy Management (LM)

Building 100 Building 100 Off-Site Plume Delineation South of Bryan Dairy Road Data Report for Rally Stores Property November 2010 LMS/PIN/N01535 This page intentionally left blank LMS/PIN/N01535 Pinellas Environmental Restoration Project Building 100 Area Off-Site Plume Delineation South of Bryan Dairy Road Data Report for Rally Stores Property November 2010 This page intentionally left blank U.S. Department of Energy Building 100 Area Off-Site Plume Delineation South of Bryan Dairy Road November 2010 Doc. No. N01535 Page i Contents Executive Summary ....................................................................................................................... iii 1.0 Introduction ......................................................................................................................... 5

231

100 supercomputers later, Los Alamos high-performance computing...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Issue:January 2015 All Issues submit 100 supercomputers later, Los Alamos high-performance computing still supports national security mission Los Alamos National Laboratory has...

232

100 supercomputers later, Los Alamos high-performance computing...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

High-performance computing supports national security 100 supercomputers later, Los Alamos high-performance computing still supports national security mission Los Alamos National...

233

EIS-0265-SA-100: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Supplement Analysis EIS-0265-SA-100: Supplement Analysis Oregon Fish Screening Project, Screen Replacements Supplement Analysis for the Watershed Management Program...

234

Microsoft Word - HABAdv #236_100-N_RIFS.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

effort. Some examples of 100-N Work Plan data gaps include: * The source of the strontium plume is not well characterized. The strontium concentrations in the plume exceed...

235

Development of a 100-Watt High Temperature Thermoelectric Generator...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Generator Development of a 100-Watt High Temperature Thermoelectric Generator Test results for low and high temperature thermoelectric generators (TEG) those for a...

236

EIS-0285-SA-100: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Supplement Analysis EIS-0285-SA-100: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Libby-Conkelly, 12 to 264...

237

Combined Heat and Power System Enables 100% Reliability at Leading...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

buildings on nearly 1,000 acres. Photo courtesy of Thermal Energy Corporation Combined Heat and Power System Enables 100% Reliability at Leading Medical Campus Recovery Act...

238

100-D/H Remedial Investigation/ Feasibility Study /Proposed...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Remedial Investigation Feasibility Study Proposed Plan Nina Menard Washington State Department of Ecology 100-DH RIFSPP * Received Draft RIFSPP on December 14, 2012 *...

239

DOE to Award $100 Million for Energy Frontier Research Centers...  

Office of Science (SC) Website

to Award 100 Million for Energy Frontier Research Centers Energy Frontier Research Centers (EFRCs) EFRCs Home Centers Research Science Highlights News & Events EFRC News EFRC...

240

COLLOQUIUM: Spitzer's 100th: Founding PPPL & Pioneering Work...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5:30pm Colloquia MBG Auditorium COLLOQUIUM: Spitzer's 100th: Founding PPPL & Pioneering Work in Fusion Energy Dr. Greg Hammett Princeton University Professor Russell Kulsrud...

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Information Resources: IESNA LM-80-08 - An Overview of the Test Procedure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® This October 30, 2008 webcast provided an overview of LM-80-08, Approved Method for Measuring Lumen Maintenance of LED Light Sources, and how DOE's ENERGY STAR program for Solid-State Lighting (SSL) Luminaires will use LM-80 to estimate lifetime for qualified SSL Luminaires. Richard Karney, U.S. Department of Energy, began the webcast with the announcement that LM-80-08 is now available through IESNA. The test procedure can be purchased online through the IES store at https://www.ies.org/store/. Kevin Dowling, Chairman, Testing Procedures SSL Committee, presented on the specifics of the LM-80 test procedure and the changes reflected in the final version. Jeff McCullough, Pacific Northwest National Laboratory, went through an overview of how the results of LM-80 are used for the DOE ENERGY STAR SSL program.

242

Data:80ccb80f-86de-43f9-bd48-6d03f77aafab | Open Energy Information  

Open Energy Info (EERE)

80ccb80f-86de-43f9-bd48-6d03f77aafab 80ccb80f-86de-43f9-bd48-6d03f77aafab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Cooperative Inc Effective date: 2013/02/01 End date if known: Rate name: Rate Schedule A-3 Sector: Residential Description: Residential consumer-members of the Cooperative using the Cooperative's standard single-phase service when the total demand or Alternate Energy Generation does not exceed 50 KW. This rate shall be limited to those members installing dual fuel comfort system consisting of an air source heat pump, integrated with a fuel oil, natural gas, or propane gas furnace or an electric thermal storage heating system or a geothermal heat pump. Service is subject to the established rules, regulations, and bylaws of the Cooperative.

243

100-F Target Analyte List Development for Soil  

SciTech Connect (OSTI)

This report documents the process used to identify source area target analytes in support of the 100-F Area remedial investigation/feasibility study (RI/FS) addendum to the Integrated 100 Area Remedial Investigation/Feasibility Study Work Plan (DOE/RL-2008-46, Rev. 0).

Ovink, R.

2012-09-18T23:59:59.000Z

244

100-B/C Target Analyte List Development for Soil  

SciTech Connect (OSTI)

This report documents the process used to identify source area target analytes in support of the 100-B/C remedial investigation/feasibility study addendum to DOE/RL-2008-46. This report also establishes the analyte exclusion criteria applicable for 100-B/C use and the analytical methods needed to analyze the target analytes.

R.W. Ovink

2010-03-18T23:59:59.000Z

245

MATH 100 Introduction to the Profession Introduction to MATLAB  

E-Print Network [OSTI]

MATH 100 ­ Introduction to the Profession Introduction to MATLAB Greg Fasshauer Department;MATLAB Introductory Material MATLAB Guides Quite a bit of introductory material is posted online at http://math.iit.edu/fass/100.html. This includes Getting Started in MATLAB (Some very basic info to get you off the ground

Fasshauer, Greg

246

100-K Target Analyte List Development for Soil  

SciTech Connect (OSTI)

This report documents the process used to identify source area target analytes in support of the 100-K Area remedial investigation/feasibility study (RI/FS) addendum to the Integrated 100 Area Remedial Investigation/Feasibility Study Work Plan (DOE/RL-2008-46, Rev. 0).

Ovink, R.

2012-09-18T23:59:59.000Z

247

Future perspectives at SIS-100 with HADES-at-FAIR  

E-Print Network [OSTI]

Currently, the HADES spectrometer undergoes un upgrade program to be prepared for measurements at the upcoming SIS-100 synchrotron at FAIR. We describe the current status of the HADES di-electron measurements at the SIS-18 and our future plans for SIS-100.

Frhlich, I

2009-01-01T23:59:59.000Z

248

Future perspectives at SIS-100 with HADES-at-FAIR  

E-Print Network [OSTI]

Currently, the HADES spectrometer undergoes un upgrade program to be prepared for measurements at the upcoming SIS-100 synchrotron at FAIR. We describe the current status of the HADES di-electron measurements at the SIS-18 and our future plans for SIS-100.

The HADES Collaboration; I. Froehlich; G. Agakishiev; A. Balanda; G. Bellia; D. Belver; A. Belyaev; A. Blanco; M. Boehmer; J. L. Boyard; P. Braun-Munzinger; P. Cabanelas; E. Castro; S. Chernenko; T. Christ; M. Destefanis; J. Diaz; F. Dohrmann; A. Dybczak; L. Fabbietti; O. Fateev; P. Finocchiaro; P. Fonte; J. Friese; T. Galatyuk; J. A. Garzon; R. Gernhaeuser; A. Gil; C. Gilardi; M. Golubeva; D. Gonzalez-Diaz; E. Grosse; F. Guber; M. Heilmann; T. Hennino; R. Holzmann; A. Ierusalimov; I. Iori; A. Ivashkin; M. Jurkovic; B. Kaempfer; K. Kanaki; T. Karavicheva; D. Kirschner; I. Koenig; W. Koenig; B. W. Kolb; R. Kotte; A. Kozuch; A. Krasa; F. Krizek; R. Kruecken; W. Kuehn; A. Kugler; A. Kurepin; J. Lamas-Valverde; S. Lang; J. S. Lange; K. Lapidus; T. Liu; L. Lopes; M. Lorenz; L. Maier; A. Mangiarotti; J. Marin; J. Markert; V. Metag; B. Michalska; J. Michel; D. Mishra; E. Moriniere; J. Mousa; C. Muentz; L. Naumann; R. Novotny; J. Otwinowski; Y. C. Pachmayer; M. Palka; Y. Parpottas; V. Pechenov; O. Pechenova; T. Perez Cavalcanti; J. Pietraszko; W. Przygoda; B. Ramstein; A. Reshetin; A. Rustamov; A. Sadovsky; P. Salabura; A. Schmah; R. Simon; Yu. G. Sobolev; S. Spataro; B. Spruck; H. Stroebele; J. Stroth; C. Sturm; M. Sudol; A. Tarantola; K. Teilab; P. Tlusty; M. Traxler; R. Trebacz; H. Tsertos; I. Veretenkin; V. Wagner; M. Weber; M. Wisniowski; J. Wuestenfeld; S. Yurevich; Y. Zanevsky; P. Zhou; P. Zumbruch

2009-06-15T23:59:59.000Z

249

MHK Technologies/Pulse Stream 100 | Open Energy Information  

Open Energy Info (EERE)

Pulse Stream 100 Pulse Stream 100 < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Pulse Stream 100.jpg Technology Profile Primary Organization Pulse Tidal Ltd Project(s) where this technology is utilized *MHK Projects/Pulse Stream 100 Demonstration Project Technology Resource Click here Wave Technology Type Click here Oscillating Wave Surge Converter Technology Readiness Level Click here TRL 5/6: System Integration and Technology Laboratory Demonstration Technology Description The 100kW Humber prototype system uses tidal streams to oscillate horizontal blades rather than extracting energy in the same way as a wind turbine through rotary blades. This mode of operation is the key to the device's unique access to shallow water and has so far shown that it can harness enough energy to power 70 homes. The device is connected to the national grid through nearby industrial process plant Millennium Inorganic Chemicals and Ethernet connected through neighbouring resin manufacturing company Cray Valley.

250

Q value of the 100Mo Double-Beta Decay  

E-Print Network [OSTI]

Penning trap measurements using mixed beams of 100Mo - 100Ru and 76Ge - 76Se have been utilized to determine the double-beta decay Q-values of 100Mo and 76Ge with uncertainties less than 200 eV. The value for 76Ge, 2039.04(16) keV is in agreement with the published SMILETRAP value. The new value for 100Mo, 3034.40(17) keV is 30 times more precise than the previous literature value, sufficient for the ongoing neutrinoless double-beta decay searches in 100Mo. Moreover, the precise Q-value is used to calculate the phase-space integrals and the experimental nuclear matrix element of double-beta decay.

S. Rahaman; V. -V. Elomaa; T. Eronen; J. Hakala; A. Jokinen; J. Julin; A. Kankainen; A. Saastamoinen; J. Suhonen; C. Weber; J. yst

2007-12-20T23:59:59.000Z

251

ST1, EAST1, ITER-100 -all exceeding ignition criterion  

E-Print Network [OSTI]

approaches to fusion plasma 3 2 Lithium Wall Fusion (LiWF) 6 3 3 Missions - 3 machines 19 4 Summary 28 Leonid, March 16-20, 2009PRINCETON PLASMA PHYSICS LABORATORY PPPL 2 #12;1 Two approaches to fusion plasma Approach 1: 1. mix the energetic (80 keV), the most capable particles with the cold stuff from walls, 2

Zakharov, Leonid E.

252

Subject Course Course Title 13-14 Lab Fee AGR 4911 Sr Honors Res Lab $100  

E-Print Network [OSTI]

Lab $100 AGED 4821 Adv Ed App Micro Lab $100 AGED 6011 Instr Methods Lab $100 AGED 6251 Teach Ag Mech Lab $150 AGED 6801 Digital Classrm Lab $100 AGED 6821 Adv Ed App Micro Lab $100 AGED 7361 Internshp Drain Irrig Lab $100 AGM 4051 Env Control Lab $100 AGM 4061 Mech & Hydro Sys Lab $100 AGM 4101 Precision

Duchowski, Andrew T.

253

Materials Degradation in Light Water Reactors: Life After 60 | Department  

Broader source: Energy.gov (indexed) [DOE]

Materials Degradation in Light Water Reactors: Life After 60 Materials Degradation in Light Water Reactors: Life After 60 Materials Degradation in Light Water Reactors: Life After 60 Nuclear reactors present a very harsh environment for components service. Components within a reactor core must tolerate high temperature water, stress, vibration, and an intense neutron field. Degradation of materials in this environment can lead to reduced performance, and in some cases, sudden failure. A recent EPRI-led study interviewed 47 US nuclear utility executives to gauge perspectives on long-term operation of nuclear reactors. Nearly 90% indicated that extensions of reactor lifetimes to beyond 60 years were likely. When polled on the most challenging issues facing further life extension, two-thirds cited plant reliability as the

254

Obama Administration Delivers More than $60 Million for Weatherization  

Broader source: Energy.gov (indexed) [DOE]

Obama Administration Delivers More than $60 Million for Obama Administration Delivers More than $60 Million for Weatherization Programs in Six States and Territories Obama Administration Delivers More than $60 Million for Weatherization Programs in Six States and Territories September 14, 2009 - 12:00am Addthis WASHINGTON, DC - U.S. Department of Energy Secretary Steven Chu today announced that the Department of Energy is providing more than $60 million in funding from the American Recovery and Reinvestment Act to expand weatherization assistance programs in American Samoa, Northern Arapaho Tribe, Northern Mariana Islands, Puerto Rico, Tennessee, and the U.S. Virgin Islands. The funding, along with additional funds to be disbursed after the grantees meet certain Recovery Act milestones, will help to weatherize nearly 17,000 homes, lowering energy costs for low-income

255

Department of Energy to Invest $60 Million to Develop Innovative  

Broader source: Energy.gov (indexed) [DOE]

60 Million to Develop Innovative 60 Million to Develop Innovative Concentrating Solar Power Technologies Department of Energy to Invest $60 Million to Develop Innovative Concentrating Solar Power Technologies October 25, 2011 - 2:27pm Addthis Washington, D.C. - As part of the U.S. Department of Energy's SunShot Initiative, Energy Secretary Steven Chu today announced a $60 million investment over 3 years for applied scientific research to advance cutting-edge Concentrating Solar Power (CSP) technologies. CSP technologies use mirrors to reflect and concentrate sunlight to produce heat, which can then be used to produce electricity. Funded through DOE's Office of Energy Efficiency and Renewable Energy, this research supports DOE's SunShot Initiative, a collaborative national effort to reduce the cost of

256

$60 Million to Fund Projects Advancing Concentrating Solar Power |  

Broader source: Energy.gov (indexed) [DOE]

$60 Million to Fund Projects Advancing Concentrating Solar Power $60 Million to Fund Projects Advancing Concentrating Solar Power $60 Million to Fund Projects Advancing Concentrating Solar Power November 8, 2011 - 10:34am Addthis A 101 video on concentrating solar panel systems. | Courtesy of the Energy Department Jesse Gary Solar Energy Technologies Program On Tuesday, October 25, the Energy Department's SunShot initiative announced a $60 million funding opportunity (FOA) to advance concentrating solar power in the United States. The SunShot program seeks to support research into technologies with potential to dramatically increase efficiency, lower costs, and deliver more reliable performance than existing commercial and near-commercial concentrating solar power (CSP) systems. The Department expects to fund 20 to 22 projects, and we encourage

257

Energy Department Announces $60 Million to Drive Affordable, Efficient  

Broader source: Energy.gov (indexed) [DOE]

60 Million to Drive Affordable, 60 Million to Drive Affordable, Efficient Solar Power Energy Department Announces $60 Million to Drive Affordable, Efficient Solar Power October 22, 2013 - 11:45am Addthis News Media Contact (202) 586-4940 WASHINGTON - Building on President Obama's broad-based plan to cut carbon pollution and support clean energy innovation across the country, Energy Secretary Moniz announced today about $60 million to support innovative solar energy research and development. As part of the Department's SunShot Initiative, these awards will help lower the cost of solar electricity, advance seamless grid integration and support a growing U.S. solar workforce. "The tremendous growth in the U.S. solar industry over the past few years is helping to pave the way to a cleaner, more sustainable energy future

258

Materials Degradation in Light Water Reactors: Life After 60 | Department  

Broader source: Energy.gov (indexed) [DOE]

Materials Degradation in Light Water Reactors: Life After 60 Materials Degradation in Light Water Reactors: Life After 60 Materials Degradation in Light Water Reactors: Life After 60 Nuclear reactors present a very harsh environment for components service. Components within a reactor core must tolerate high temperature water, stress, vibration, and an intense neutron field. Degradation of materials in this environment can lead to reduced performance, and in some cases, sudden failure. A recent EPRI-led study interviewed 47 US nuclear utility executives to gauge perspectives on long-term operation of nuclear reactors. Nearly 90% indicated that extensions of reactor lifetimes to beyond 60 years were likely. When polled on the most challenging issues facing further life extension, two-thirds cited plant reliability as the

259

$60 Million to Fund Projects Advancing Concentrating Solar Power |  

Broader source: Energy.gov (indexed) [DOE]

$60 Million to Fund Projects Advancing Concentrating Solar Power $60 Million to Fund Projects Advancing Concentrating Solar Power $60 Million to Fund Projects Advancing Concentrating Solar Power November 8, 2011 - 10:34am Addthis A 101 video on concentrating solar panel systems. | Courtesy of the Energy Department Jesse Gary Solar Energy Technologies Program On Tuesday, October 25, the Energy Department's SunShot initiative announced a $60 million funding opportunity (FOA) to advance concentrating solar power in the United States. The SunShot program seeks to support research into technologies with potential to dramatically increase efficiency, lower costs, and deliver more reliable performance than existing commercial and near-commercial concentrating solar power (CSP) systems. The Department expects to fund 20 to 22 projects, and we encourage

260

Obama Administration Delivers More than $60 Million for Weatherization  

Broader source: Energy.gov (indexed) [DOE]

Obama Administration Delivers More than $60 Million for Obama Administration Delivers More than $60 Million for Weatherization Programs in Six States and Territories Obama Administration Delivers More than $60 Million for Weatherization Programs in Six States and Territories September 14, 2009 - 12:00am Addthis WASHINGTON, DC - U.S. Department of Energy Secretary Steven Chu today announced that the Department of Energy is providing more than $60 million in funding from the American Recovery and Reinvestment Act to expand weatherization assistance programs in American Samoa, Northern Arapaho Tribe, Northern Mariana Islands, Puerto Rico, Tennessee, and the U.S. Virgin Islands. The funding, along with additional funds to be disbursed after the grantees meet certain Recovery Act milestones, will help to weatherize nearly 17,000 homes, lowering energy costs for low-income

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Inactivation of ebola virus with Co(60) irradiation  

SciTech Connect (OSTI)

Ebola virus was inactivated in a log-linear relationship to Co(60) gamma-irradiation dosage with 1.0 log10 pfu/ml reduction in viral titer after 8 min exposure 23,000.

Lupton, H.W.

1980-09-08T23:59:59.000Z

262

Policy Flash 2012-60 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Policy Flash 2012-60 Acquisition Guide Chapter 13.1, Purchase Card Policy and Operating Procedures Questions concerning this policy flash should be directed to Denise T. Clarke...

263

DOE Announces $60 Million in Projects to Accelerate Scientific...  

Energy Savers [EERE]

- 8:53am Addthis WASHINGTON, D.C. - The U.S. Department of Energy's (DOE) Office of Science today announced approximately 60 million in new awards annually for 30 computational...

264

Title 18 Alaska Administrative Code Chapter 60 Solid Waste Management...  

Open Energy Info (EERE)

Solid Waste Management Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 Alaska Administrative Code Chapter 60 Solid...

265

POlicy Flash 2013-60 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Flash 2013-60 Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division, at Kevin.M.Smith@hq.doe.gov...

266

ARM - Datastreams - 30co2flx60m  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

flx60m flx60m Documentation Data Quality Plots Citation DOI: 10.5439/1025038 [ What is this? ] Generate Citation ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Datastream : 30CO2FLX60M Eddy Correlation CO2 Flux Data: 60 m samples, 30-min avg Active Dates 2001.01.01 - 2013.01.27 Measurement Categories Atmospheric Carbon, Atmospheric State, Surface Properties Originating Instrument Carbon Dioxide Flux Measurement Systems (CO2FLX) Measurements The measurements below provided by this product are those considered scientifically relevant. Measurement Variable Atmospheric turbulence Lmoni CO2 flux fc_corr CO2 flux fc_wpl_h CO2 flux fc_wpl_le Sensible heat flux h Latent heat flux le CO2 concentration mean_c Atmospheric moisture

267

File:NREL-ar-80m.pdf | Open Energy Information  

Open Energy Info (EERE)

ar-80m.pdf ar-80m.pdf Jump to: navigation, search File File history File usage Arkansas Annual Average Wind Speed at 80 Meters Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 1.2 MB, MIME type: application/pdf) Description Arkansas Annual Average Wind Speed at 80 Meters Sources National Renewable Energy Laboratory Related Technologies Wind Creation Date 2010-01-15 Extent State Countries United States UN Region Northern America States Arkansas File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 17:37, 21 December 2010 Thumbnail for version as of 17:37, 21 December 2010 1,275 × 1,650 (1.2 MB) MapBot (Talk | contribs) Automated upload from NREL's "mapsearch" data

268

DOE Awards Sixteen Contracts for up to $80 Billion in Energy Efficiency,  

Broader source: Energy.gov (indexed) [DOE]

Sixteen Contracts for up to $80 Billion in Energy Sixteen Contracts for up to $80 Billion in Energy Efficiency, Renewable Energy, and Water Conservation Projects at Federal Facilities DOE Awards Sixteen Contracts for up to $80 Billion in Energy Efficiency, Renewable Energy, and Water Conservation Projects at Federal Facilities December 18, 2008 - 8:51am Addthis WASHINGTON - Today the Department of Energy (DOE) announced the award of 16 new Indefinite Delivery Indefinite Quantity (IDIQ) Energy Savings Performance Contracts (ESPCs) that could result in up to $80 billion in energy efficiency, renewable energy, and water conservation projects at federally-owned buildings and facilities. ESPCs help to meet the federal government's energy efficiency, water conservation, and renewable energy goals. The federal government is the largest single user of energy in the

269

DOE Announces Solicitation for $8.0 Billion in Loan Guarantees | Department  

Broader source: Energy.gov (indexed) [DOE]

Solicitation for $8.0 Billion in Loan Guarantees Solicitation for $8.0 Billion in Loan Guarantees DOE Announces Solicitation for $8.0 Billion in Loan Guarantees September 22, 2008 - 3:43pm Addthis Third Round of Solicitations Targets Innovative Clean Coal Technologies WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced a solicitation for up to $8.0 billion in federal loan guarantees for projects that employ advanced technologies that avoid, reduce or sequester emissions of air pollutants or greenhouse gases in the area of coal-based power generation, industrial gasification, and advanced coal gasification facilities. This marks the third round of solicitations for DOE's Loan Guarantee Program, which encourages the commercial use of new or significantly improved energy technologies and is an important step in

270

File:NREL-az-80m.pdf | Open Energy Information  

Open Energy Info (EERE)

az-80m.pdf az-80m.pdf Jump to: navigation, search File File history File usage Arizona Annual Average Wind Speed at 80 Meters Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 1.24 MB, MIME type: application/pdf) Description Arizona Annual Average Wind Speed at 80 Meters Sources National Renewable Energy Laboratory Related Technologies Wind Creation Date 2010-01-15 Extent State Countries United States UN Region Northern America States Arizona File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:00, 21 December 2010 Thumbnail for version as of 15:00, 21 December 2010 1,275 × 1,650 (1.24 MB) MapBot (Talk | contribs) Automated upload from NREL's "mapsearch" data

271

E-Print Network 3.0 - aged 80 and over Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Search Sample search results for: aged 80 and over Page: << < 1 2 3 4 5 > >> 1 Fra Mauro Formation,Apollo 14: 11. r - rAges of Apollo 14 Rocks F. J. stadennannl, E....

272

Half-Life Measurement for the rp-Process Waiting Point Nuclide Z80r  

Science Journals Connector (OSTI)

X-ray bursts have been suggested as a possible site for the astrophysical rp-process. The time scale for the process is governed by ?-decay half-lives of several even-even N=Z waiting point nuclei, in particular, N=Z=40 80Zr. A 4.1({+0.8}{-0.6})-s ?+/EC half-life for 80Zr was determined by observing delayed 84-keV ? rays depopulating a T1/2=4-?s isomer at 312 keV in the daughter 80Y. As this half-life is lower than many previously predicted values, the calculated excessive production of A=80 nuclides in astrophysical x-ray burst scenarios is reduced, and less extreme conditions are necessary for the production of heavier nuclides.

J. J. Ressler; A. Piechaczek; W. B. Walters; A. Aprahamian; M. Wiescher; J. C. Batchelder; C. R. Bingham; D. S. Brenner; T. N. Ginter; C. J. Gross; R. Grzywacz; D. Kulp; B. MacDonald; W. Reviol; J. Rikovska; K. Rykaczewski; J. A. Winger; E. F. Zganjar

2000-03-06T23:59:59.000Z

273

C.R.S. 24-80 - State History, Archives, and Emblems | Open Energy...  

Open Energy Info (EERE)

State History, Archives, and Emblems Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: C.R.S. 24-80 - State History, Archives, and...

274

Text-Alternative Version: Understanding and Evaluating In Situ TMP and LM-80 Reports  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of Day 2 of the three-part TINSSL Webinar Series "Understanding and Evaluating LM-79 & LM-80 Reports for SSL Technology," held August 11, 2010.

275

Text-Alternative Version: Walking Through Examples of Real LM-79 & LM-80 Reports  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of Day 3 of the three-part TINSSL Webinar Series "Understanding and Evaluating LM-79 & LM-80 Reports for SSL Technology," held August 12, 2010.

276

E-Print Network 3.0 - api x80 soldadas Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Search Powered by Explorit Topic List Advanced Search Sample search results for: api x80 soldadas Page: << < 1 2 3 4 5 > >> 1 A Framework for Diversifying Windows Native...

277

E-Print Network 3.0 - api x80 steel Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Kolkata, India, (2008) pages 3-11. Summary: . Y. Shan, F. R. Xiao, K.Yang and Y. H. Li, "Pipeline steel X65 X70 X80 acicular bainite ultrafine... Thermomechanical Simulation and...

278

Electric Resistance Welded Steels for Normalized N-80 Oil and Gas Well Tubulars  

Science Journals Connector (OSTI)

This paper reports the development and successful commercialization of a manganese-molybdenum steel for use in the production of normalized electric resistance welded N-80 casing and tubing. The...

David L. Sponseller; Thomas B. Cox; Evan J. Vineberg

1984-06-01T23:59:59.000Z

279

System 80+{trademark} standard design: CESSAR design certification. Volume 5: Amendment I  

SciTech Connect (OSTI)

This report has been prepared in support of the industry effort to standardize nuclear plant designs. The documents in this series describe the Combustion Engineering, Inc. System 80+{sup TM} Standard Design.

Not Available

1990-12-21T23:59:59.000Z

280

Photosynthesis Research 80: 1557, 2004. 2004 Kluwer Academic Publishers. Printed in the Netherlands.  

E-Print Network [OSTI]

Photosynthesis Research 80: 15­57, 2004. © 2004 Kluwer Academic Publishers. Printed in the Netherlands. 15 Review Discoveries in oxygenic photosynthesis (1727­2003): a perspective Dedicated, molecular biology, oxygen evolution, phosphorylation, photosynthesis, plants, reaction centers `Science

Govindjee "Gov"

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Section 80  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 1 Figure 1. Surface-based short- and long-wave radiation measurements at Colville Village during the period 17 to 25 June 1995. Fifteen- minute averaging periods, plotted at the ending time, in local time. Between Deadhorse and Lonely - First Results from an Arctic Meteorology Field Experiment C.D. Whiteman and C.E. Miller Pacific Northwest National Laboratory Richland, Washington B.D. Zak Sandia National Laboratories Albuquerque, New Mexico Introduction A preliminary ARM meteorological field experiment was conducted on the edge of the Arctic Ocean at Colville Village, Alaska, during the period from 16-26 June 1995. Colville Village (70.42EN, 150.38EW, 2 m MSL) is located on an island in the Colville River delta between Deadhorse and Lonely, Alaska. C The goals of the experiment were

282

Section 80  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

' 1 cos 2 0 J i Session Papers 351 (1) (2) Prediction and Measurement of Direct-Normal Solar Irradiance: A Closure Experiment R. N. Halthore and S. E. Schwartz Brookhaven...

283

Friction anisotropy at Ni,,100...,,100... interfaces: Molecular dynamics studies Yue Qi and Yang-Tse Cheng  

E-Print Network [OSTI]

Friction anisotropy at Ni,,100...?,,100... interfaces: Molecular dynamics studies Yue Qi and Yang of Technology, Pasadena, California, 91125 Received 8 March 2002; published 30 August 2002 The friction theories predict that most perfect clean incommensurate interfaces would produce no static friction

Goddard III, William A.

284

HIP4080, 80V High Frequency H-Bridge Driver Introduction  

E-Print Network [OSTI]

4-1 HIP4080, 80V High Frequency H-Bridge Driver Introduction The HIP4080 is a member of the HIP408X family of High Fre- quency H-Bridge Driver ICs. A simplified application diagram is shown in Figure 1. The HIP4080 H-Bridge driver IC provides the ability to operate from 8VDC to 80VDC busses for driving N

Paderborn, Universität

285

Star Formation Signatures in the Condensation Downstream of HH 80N  

E-Print Network [OSTI]

HH80N is one of the Herbig-Haro objects that have associated quiescent dense clumps. We report CO and CS BIMA observations that reveal star formation within the HH80N dense clump. The CO emission reveals clearly a bipolar molecular outflow centered on the dense clump. The CS emission traces a ring-like structure of radius ~0.24 pc. The CS kinematics shows that the ring is collapsing with an infall speed of ~0.6 km/s. The required mass to produce the collapse is in agreement with previous ammonia observations of the 20 solar mass core, which is embedded within the CS structure. However, we cannot discard that the ring structure is expanding driven by protostellar winds, if the CS abundance if unusually high and the CO momentum rate is much higher than that measured, due to inclination and optical depth effects. The properties of the molecular outflow and of the dense core suggest that it harbors a Class 0 object. There are also signatures of interaction of the HH 80/81/80N outflow with the dense gas. In particular it is possible that the HH 80/81/80N outflow has triggered or at least speed up the star formation in this region.

J. M. Girart; R. Estalella; S. Viti; D. A. Williams; P. T. P Ho

2001-10-02T23:59:59.000Z

286

Nuclear spin isomers of guest molecules in H2@C60, H2O@C60 and other endofullerenes  

Science Journals Connector (OSTI)

...D2@C60 molecules, which might produce a plasma of ionized carbon and deuterons, would provide...fuel reactors. Report no. PPPL-2446. Princeton, NJ: Plasma Physics Laboratory, Princeton University. ( doi:10.2172/6169161...

2013-01-01T23:59:59.000Z

287

Microsoft Word - RD100UpdatedList.docx  

Broader source: Energy.gov (indexed) [DOE]

Research Projects Win 36 R&D 100 Awards Research Projects Win 36 R&D 100 Awards U.S. Department of Energy researchers have won 36 of the 100 awards given out this year by R&D Magazine for the most outstanding technology developments of 2012. The awards are presented annually in recognition of exceptional new products, processes, materials, or software that were developed throughout the world and introduced into the market the previous year. Researchers at ten of DOE's national laboratories and the Y-12 National Security Complex won awards this year. The R&D 100 awards highlight some of the successes achieved by the Department's national laboratories in technology transfer of basic research results into commercial products. Since 1962, when R&D Magazine's annual competition began, DOE national laboratories have

288

Energy Department to Award $100 Million for Energy Frontier Research  

Broader source: Energy.gov (indexed) [DOE]

to Award $100 Million for Energy Frontier to Award $100 Million for Energy Frontier Research Centers Energy Department to Award $100 Million for Energy Frontier Research Centers September 30, 2013 - 4:39pm Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON - U.S. Energy Secretary Ernest Moniz today announced a proposed $100 million in FY2014 funding for Energy Frontier Research Centers to accelerate the scientific breakthroughs needed to build a new 21st-century energy economy. Research supported by this initiative will enable fundamental advances in energy production and use. "Transforming how we generate, transmit, store and use energy is one of the greatest scientific challenges we face in the changing energy landscape," said Secretary Moniz. "This funding will help fuel innovative solutions as we move toward next generation energy systems."

289

Department of Energy Announces $100 Million Available for Innovative  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Announces $100 Million Available for Department of Energy Announces $100 Million Available for Innovative Research Projects Department of Energy Announces $100 Million Available for Innovative Research Projects March 2, 2010 - 12:00am Addthis WASHINGTON, D.C. - At the inaugural ARPA-E Energy Innovation Summit today, U.S. Energy Secretary Steven Chu announced $100 million in Recovery Act funding will be made available to accelerate innovation in green technology, increase America's competitiveness and create new jobs. Today's announcement comes as some of the nation's top energy leaders and members of the scientific research community have gathered to ensure U.S. leadership in clean energy technologies. "This is about unleashing the American innovation machine to solve the energy and climate challenge, while creating new jobs, new industries and

290

Department of Energy Announces $100 Million Available for Innovative  

Broader source: Energy.gov (indexed) [DOE]

100 Million Available for 100 Million Available for Innovative Research Projects Department of Energy Announces $100 Million Available for Innovative Research Projects March 2, 2010 - 12:00am Addthis WASHINGTON, D.C. - At the inaugural ARPA-E Energy Innovation Summit today, U.S. Energy Secretary Steven Chu announced $100 million in Recovery Act funding will be made available to accelerate innovation in green technology, increase America's competitiveness and create new jobs. Today's announcement comes as some of the nation's top energy leaders and members of the scientific research community have gathered to ensure U.S. leadership in clean energy technologies. "This is about unleashing the American innovation machine to solve the energy and climate challenge, while creating new jobs, new industries and

291

Argonne Transportation - 1998 R&D 100 Award  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1998 R&D 100 AWARD WINNER 1998 R&D 100 AWARD WINNER Near-Frictionless Carbon Coating Is Really Slick! Argonne researchers Ali Erdemir and George Fenske has received a 1998 R&D 100 Award for their near-frictionless carbon (NFC) film coating. Each year, R&D Magazine honors 100 new products that have great technological significance. The new material is many times slicker than Teflon - its coefficient of friction is less than 0.001 when measured in a dry nitrogen atmosphere - 20 times lower than the previous record holder, molybdenum disulfide. (Under the same conditions, Teflon's coefficient of friction is around 0.04.) Thin (1-micrometer) NFC films can be deposited on virtually any substrate by ion-beam deposition, sputtering, or chemical vapor deposition at low temperatures (room temperature to 200°C) without risking damage to heat-sensitive materials.

292

Fueling Innovation -- 100 MPGe at a Time | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Fueling Innovation -- 100 MPGe at a Time Fueling Innovation -- 100 MPGe at a Time Fueling Innovation -- 100 MPGe at a Time August 4, 2010 - 2:48pm Addthis X Prize contenders take part in on-track testing at Michigan International Speedway | Courtesy of Progressive Automotive X Prize X Prize contenders take part in on-track testing at Michigan International Speedway | Courtesy of Progressive Automotive X Prize John Schueler John Schueler Former New Media Specialist, Office of Public Affairs What does this project do? Develops the next generation of automotive engineers Showcases innovative approaches for breaking the 100 MPGe barrier With hybrids becoming more commonplace in auto showrooms and electric cars beginning to break into the mainstream market, on streets across the country you can see that the automotive industry is moving toward energy

293

Operational and maintenance manual, 100 ton hydraulic trailer  

SciTech Connect (OSTI)

The 100 ton hydraulic trailer is used to remove the mitigation pump from Tank 241SY101. This manual explains how to inspect, operate, and maintain the trailer in a state of readiness.

Koons, B.M.

1995-03-03T23:59:59.000Z

294

R&D 100: Lab Researchers Contribute to Public Safety  

Broader source: Energy.gov [DOE]

Scientists at two Energy Department Labs and the Y-12 National Security Complex received R&D 100 awards -- also known as the "Oscars of innovation" -- for technologies that advance national security and public safety.

295

Laboratory snags five R&D 100 awards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

snags five R&D 100 awards Winning Laboratory projects are MagViz, the SIMTECHE CO2 Capture Process, Lasonix, TeraOps Software Radio, and the Artificial Retina Project. July 21,...

296

Hanford Site - 100-HR-3-H | Department of Energy  

Office of Environmental Management (EM)

Requirement Cr (total) 126 Yes 100 (DWS); 48 (MTCA) Cr-6 133 Yes 48 (MTCA); 10 (AWQC) Isotope Name Concentration (pCil) Regulatory Driver Cleanup Requirement Gross Beta 73 No...

297

Hanford Site - 100-KR-4 | Department of Energy  

Office of Environmental Management (EM)

Cr (total) 622 Yes 100 (DWS); 48 (MTCA) Cr-6 3280 Yes 48 (MTCA); 10 (AWQC) Isotope Name Concentration (pCil) Regulatory Driver Cleanup Requirement C-14 9520 Yes 2000...

298

Hanford Site - 100-BC-5 | Department of Energy  

Office of Environmental Management (EM)

Requirement Cr (total) 71 Yes 100 (DWS); 48 (MTCA) Cr-6 62.5 Yes 48 (MTCA); 10 (AWQC) Isotope Name Isotope Activity (pCil) Regulatory Driver Cleanup Requirement Sr-90 53 Yes 8...

299

Hanford Site - 100-NR-2 | Department of Energy  

Office of Environmental Management (EM)

177 Yes 100 (DWS); 48 (MTCA) Cr-6 159 Yes 48 (MTCA); 10 (AWQC) As 50.1 Yes 10 (DWS) Isotope Name Concentration (pCil) Regulatory Driver Cleanup Requirement Gross Beta 24000 No...

300

Hanford Site - 100-FR-3 | Department of Energy  

Office of Environmental Management (EM)

Cr (total) 35.4 Yes 100 (DWS); 48 (MTCA) Cr-6 25.5 Yes 48 (MTCA); 10 (AWQC) Isotope Name Concentration (pCil) Regulatory Driver Cleanup Requirement Sr-90 180 Yes 8...

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Hanford Site - 100-HR-3-D | Department of Energy  

Office of Environmental Management (EM)

Cr (total) 4980 Yes 100 (DWS); 48 (MTCA) Cr-6 4640 Yes 48 (MTCA); 10 (AWQC) Isotope Name Concentration (pCil) Regulatory Driver Cleanup Requirement Sr-90 31 Yes 8 (DWS)...

302

Power plant system assessment. Final report. SP-100 Program  

SciTech Connect (OSTI)

The purpose of this assessment was to provide system-level insights into 100-kWe-class space reactor electric systems. Using these insights, Rockwell was to select and perform conceptual design studies on a ''most attractive'' system that met the preliminary design goals and requirements of the SP-100 Program. About 4 of the 6 months were used in the selection process. The remaining 2 months were used for the system conceptual design studies. Rockwell completed these studies at the end of FY 1983. This report summarizes the results of the power plant system assessment and describes our choice for the most attractive system - the Rockwell SR-100G System (Space Reactor, 100 kWe, Growth) - a lithium-cooled UN-fueled fast reactor/Brayton turboelectric converter system.

Anderson, R.V.; Atkins, D.F.; Bost, D.S.; Berman, B.; Clinger, D.A.; Determan, W.R.; Drucker, G.S.; Glasgow, L.E.; Hartung, J.A.; Harty, R.B.

1983-10-31T23:59:59.000Z

303

Development of a 100-Watt High Temperature Thermoelectric Generator  

Broader source: Energy.gov [DOE]

Test results for low and high temperature thermoelectric generators (TEG) those for a 530-watt BiTe TEG; design and construction of a 100-watt high temperature TEG currently in fabrication.

304

Transcending Portland Cement with 100 percent fly ash concrete  

SciTech Connect (OSTI)

The use of concrete, made with 100% fly ash and no Portland cement, in buildings at the Transportation Institute in Bozeman, MT, USA, is described. 3 refs., 7 figs.

Cross, D.; Akin, M.; Stephens, J.; Cuelh, E. [Montana State University, MT (United States)

2009-07-01T23:59:59.000Z

305

Results of the 2007 B100 Quality Survey  

SciTech Connect (OSTI)

In a 2007 analysis of samples from 52% of U.S. biodiesel (B100) producers, 90% met ASTM and other specifications for critical engine performance properties and for elements that harm emission controls.

Alleman, T. L.; McCormick, R. L.

2008-03-01T23:59:59.000Z

306

Ge-Au eutectic bonding of Ge {100} single crystals  

Science Journals Connector (OSTI)

We present preliminary results on the eutectic bonding between two {100} Ge single crystal surfaces using thin films of ... Au sample show epitaxial growth of Ge. In sections of the bond, lattice continuity...

W. B. Knowlton; K. M. Itoh; J. W. Beeman; J. H. Emes

1993-11-01T23:59:59.000Z

307

Obama Administration Announces Nearly $100 Million for Smart Grid Workforce  

Broader source: Energy.gov (indexed) [DOE]

Obama Administration Announces Nearly $100 Million for Smart Grid Obama Administration Announces Nearly $100 Million for Smart Grid Workforce Training and Development Obama Administration Announces Nearly $100 Million for Smart Grid Workforce Training and Development April 8, 2010 - 12:00am Addthis ROCKVILLE, MD -U.S. Secretary of Energy Steven Chu announced today that the Department of Energy is announcing award selections for nearly $100 million for 54 smart grid workforce training programs that will help prepare the next generation of workers in the utility and electrical manufacturing industries. These projects will leverage more than $95 million in funding from community colleges, universities, utilities and manufacturers to develop and implement training programs. The selectees estimate that the programs will train approximately 30,000 Americans. These workers will

308

Biomedical Engineering Courses BME 100 Introduction to Biomedical Engineering (required)  

E-Print Network [OSTI]

Biomedical Engineering Courses BME 100 Introduction to Biomedical Engineering (required) A rigorous introduction to biomedical engineering that provides the historical and social context of BME though Minor or Departmental Consent 3 credits, Fall only BME 212 Biomedical Engineering Research Fundamentals

Ge, Qiaode Jeff

309

The generation of shared cryptographic keys through channel impulse response estimation at 60 GHz.  

SciTech Connect (OSTI)

Methods to generate private keys based on wireless channel characteristics have been proposed as an alternative to standard key-management schemes. In this work, we discuss past work in the field and offer a generalized scheme for the generation of private keys using uncorrelated channels in multiple domains. Proposed cognitive enhancements measure channel characteristics, to dynamically change transmission and reception parameters as well as estimate private key randomness and expiration times. Finally, results are presented on the implementation of a system for the generation of private keys for cryptographic communications using channel impulse-response estimation at 60 GHz. The testbed is composed of commercial millimeter-wave VubIQ transceivers, laboratory equipment, and software implemented in MATLAB. Novel cognitive enhancements are demonstrated, using channel estimation to dynamically change system parameters and estimate cryptographic key strength. We show for a complex channel that secret key generation can be accomplished on the order of 100 kb/s.

Young, Derek P.; Forman, Michael A.; Dowdle, Donald Ryan

2010-09-01T23:59:59.000Z

310

Data:19353b70-5153-4557-8be7-db6dc100b549 | Open Energy Information  

Open Energy Info (EERE)

b70-5153-4557-8be7-db6dc100b549 b70-5153-4557-8be7-db6dc100b549 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Russell, Massachusetts (Utility Company) Effective date: 2009/01/01 End date if known: Rate name: LARGE GENERAL SERVICE SCHEDULE LG Sector: Industrial Description: Additional Info: Availability: To any non-residential customer having a three phase service. With a consistent demand less than (a) 80kw of demand/per 30 minutes and/or (b) 30,000 kWhr's per month. Minimum Bill: $40.00 / Month. Plus $4.00 per kVA for transformer capacity installed if customer exceeds 80kw and/or 30,000kWhr's per month.

311

File:NREL-al-80m.pdf | Open Energy Information  

Open Energy Info (EERE)

al-80m.pdf al-80m.pdf Jump to: navigation, search File File history File usage Alabama Annual Average Wind Speed at 80 Meters (PDF) Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 1.33 MB, MIME type: application/pdf) Title Alabama Annual Average Wind Speed at 80 Meters (PDF) Description Alabama Annual Average Wind Speed at 80 Meters (PDF) Sources National Renewable Energy Laboratory Related Technologies Wind Creation Date 2010/01/15 Extent State Countries United States UN Region Northern America States Alabama File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 14:21, 21 December 2010 Thumbnail for version as of 14:21, 21 December 2010 1,275 × 1,650 (1.33 MB) MapBot (Talk | contribs) Automated upload from NREL's "mapsearch" data

312

The SNL100-03 Blade: Design Studies with Flatback Airfoils for the Sandia 100-meter Blade.  

SciTech Connect (OSTI)

A series of design studies were performed to inv estigate the effects of flatback airfoils on blade performance and weight for large blades using the Sandi a 100-meter blade designs as a starting point. As part of the study, the effects of varying the blade slenderness on blade structural performance was investigated. The advantages and disadvantages of blad e slenderness with respect to tip deflection, flap- wise & edge-wise fatigue resistance, panel buckling capacity, flutter speed, manufacturing labor content, blade total weight, and aerodynamic design load magn itude are quantified. Following these design studies, a final blade design (SNL100-03) was prod uced, which was based on a highly slender design using flatback airfoils. The SNL100-03 design with flatback airfoils has weight of 49 tons, which is about 16% decrease from its SNL100-02 predecessor that used conventional sharp trailing edge airfoils. Although not systematically optimized, the SNL100 -03 design study provides an assessment of and insight into the benefits of flatback airfoils for la rge blades as well as insights into the limits or negative consequences of high blade slenderness resulting from a highly slender SNL100-03 planform as was chosen in the final design definition. This docum ent also provides a description of the final SNL100-03 design definition and is intended to be a companion document to the distribution of the NuMAD blade model files for SNL100-03, which are made publicly available. A summary of the major findings of the Sandia 100-meter blade development program, from the initial SNL100-00 baseline blade through the fourth SNL100-03 blade study, is provided. This summary includes the major findings and outcomes of blade d esign studies, pathways to mitigate the identified large blade design drivers, and tool development that were produced over the course of this five-year research program. A summary of large blade tec hnology needs and research opportunities is also presented.

Griffith, Daniel; Richards, Phillip William

2014-09-01T23:59:59.000Z

313

State Waste Discharge Permit application, 100-N Sewage Lagoon  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond.

Not Available

1994-06-01T23:59:59.000Z

314

80 Fed Reg 15618:CEQ NEPA regulations (1986): Incomplete or Unavailable  

Broader source: Energy.gov (indexed) [DOE]

80 Fed Reg 15618:CEQ NEPA regulations (1986): Incomplete or 80 Fed Reg 15618:CEQ NEPA regulations (1986): Incomplete or Unavailable Information, Final Rule 80 Fed Reg 15618:CEQ NEPA regulations (1986): Incomplete or Unavailable Information, Final Rule The final amendment requires all federal agencies to disclose the fact of incomplete or unavailable information when evaluating reasonably foreseeable significant adverse impacts on the human environment in an EIS, and to obtain that information if the overall costs of doing so are not exorbitant. If the agency is unable to obtain the information because overall costs are exorbitant or because the means to obtain it are not known, the agency must (1) affirmatively discIose the fact that such information is unavailable; (2) explain the relevance of the unavailable information; (3) summarize the existing credible scientific evidence which

315

Data:4d697111-7801-4a60-a928-d6464b079b29 | Open Energy Information  

Open Energy Info (EERE)

7801-4a60-a928-d6464b079b29 7801-4a60-a928-d6464b079b29 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Prairie Land Electric Coop Inc Effective date: 2010/01/14 End date if known: Rate name: Monthly Unmetered Investment Facility(LANTERN 35W HPS-Option A) Sector: Lighting Description: Customer-0% Cooperative-100% Source or reference: http://www.prairielandelectric.com/Rates_PDF/MKEC%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

316

Data:67f496ff-60de-4c74-a30c-d54736038363 | Open Energy Information  

Open Energy Info (EERE)

ff-60de-4c74-a30c-d54736038363 ff-60de-4c74-a30c-d54736038363 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tell City, Indiana (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Street Lighting: HPS Vapor, 100 Watts Sector: Lighting Description: The Fixed monthly charge entered here is the sum of the "Facilities" charge ($6.46) and the "Usage" charge ($1.07). When applicable: add $3.24 to the "Facilities" charge for Wood Pole, add $6.74 to the "Facilities" charge for Metal Round Pole Aluminum, add $11.33 to the "Facilities" charge for Metal Round Steel Decorative

317

Data:4971c513-0a65-4f60-8242-39043debc361 | Open Energy Information  

Open Energy Info (EERE)

3-0a65-4f60-8242-39043debc361 3-0a65-4f60-8242-39043debc361 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: OL "HPS" 100 Watt (Enclosed) (Existing) 49 kW Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

318

Data:Abb64835-dbab-4f60-9977-ec9fe654c0df | Open Energy Information  

Open Energy Info (EERE)

Abb64835-dbab-4f60-9977-ec9fe654c0df Abb64835-dbab-4f60-9977-ec9fe654c0df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: Area Lighting - HPS-L 100W Sector: Lighting Description: Public Purposes Rider = base rate x %2.85. Source or reference: http://www.avistautilities.com/services/energypricing/wa/elect/Pages/default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

319

Data:Df264355-9895-4743-81a6-0cdc84ade9ba | Open Energy Information  

Open Energy Info (EERE)

64355-9895-4743-81a6-0cdc84ade9ba 64355-9895-4743-81a6-0cdc84ade9ba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bay City, Michigan (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: Large Commercial & Industrial High Load Factor Time-of-Use (Transmission Service) Sector: Commercial Description: Subject to any restrictions, this rate is available to any customer desiring primary or secondary voltage service for general use where the billing demand is 100 kW or more. This rate is not available for street lighting service or for resale purposes. Source or reference: www.baycitymi.org/images/Department/electric/Proposed_2013_Electric_Service_Rate_Schedule.pdf

320

Data:3728846a-60d5-493b-851a-70e7578e010d | Open Energy Information  

Open Energy Info (EERE)

6a-60d5-493b-851a-70e7578e010d 6a-60d5-493b-851a-70e7578e010d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mohave Electric Cooperative, Inc Effective date: 2012/09/01 End date if known: Rate name: Rate LTOU Substation Service Sector: Industrial Description: Available to customers with demands exceeding 100 kW. A 5% discount is applied to all demand and energy charges for those customers defined as substations; service taken directly from the low side bus of the distribution substation or where the customer has requested multiple points of delivery. Source or reference: http://mohaveelectric.coopwebbuilder.com/content/rates

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

The leak resistance of 2-inch N-80 API treaded tubular connection  

E-Print Network [OSTI]

THE LEAK RESISTANCE OF 2-INCH N-80 API THREAD TOBULAR CONNECTION A Thesis Peter D. Weiner Submitted to the Graduate School of the Agricultural and Mechanical College of Texas in Partial fulfillment of the requirements for the degree of MASTER... OF SCIENCE January 1961 Ma)or Subject: Mechanical Engineering THE LEAK RESISTANCE OF 2-INCH N-80 API THREADED TUBULAR COHHECTIOH A Thesis By Peter D. Weiner Approved as to style and content by: Chairman of ittee Head of Department January 1961...

Weiner, Peter Douglas

2012-06-07T23:59:59.000Z

322

NREL: Awards and Honors - R&D 100 Awards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

R&D 100 Awards R&D 100 Awards Since its inception as the Solar Energy Research Institute (SERI) in 1977, NREL/SERI has won 52 R&D 100 awards. 2013 Image Processing Occupancy Sensor (IPOS) Isothermal Battery Calorimeters (IBCs) Mono-crystalline Solar Cells 2012 Desiccant-enhanced Evaporative (DEVAP) Air-Conditioning Cycle SJ3 Solar Cells 2011 Innovalight Silicon Ink Process Flash Quantum Efficiency (Flash QE) System for Solar Cells Optical Cavity Furnace 2010 "Black Silicon" Nanocatalytic Wet-Chemical Etch Amonix 7700 Solar Power Generator 2009 Ultra-Accelerated Weathering System (UAWS) SkyTrough(tm) Parabolic Trough Solar Concentrating Collector PowerPlane UX Microbattery 2008 Inverted Metamorphic Multijunction (IMM) Solar Cell Hybrid CIGS (Copper Indium Gallium Diselenide)

323

A National Vision for Electricity's Second 100 Years | Department of  

Broader source: Energy.gov (indexed) [DOE]

A National Vision for Electricity's Second 100 Years A National Vision for Electricity's Second 100 Years A National Vision for Electricity's Second 100 Years The purpose of this document is to describe the common vision articulated at the National Electric System Vision meeting. The U.S. Department of Energy will use this vision to help implement President Bush's call for "...modernizing America's electric delivery system" and the 51 recommendations contained in the National Transmission Grid Study. Various stakeholders, including industry practitioners, policy makers, and researchers, will use the vision as the coordinating foundation for actions leading to the construction of a 21st century electric system. The vision will guide the development of the National Electric Delivery Technologies

324

Event:Second International 100% Renewable Energy Conference and Exhibition  

Open Energy Info (EERE)

% Renewable Energy Conference and Exhibition % Renewable Energy Conference and Exhibition Jump to: navigation, search Calendar.png Second International 100% Renewable Energy Conference and Exhibition: on 2012/06/28 "IRENEC 2012 is organized by EUROSOLAR Turkey, the Turkish section of the European Association for Renewable Energies, and will serve as an international platform to discuss technical, economic and political aspects of a transition to 100% renewable energy. General topics of the conference include: renewable energy supply technologies; smart grid technologies; energy end use efficiency; energy policies; local self sufficiency; investment and financial models for renewable energy; capacity building; climate change mitigation and adaptation; and community power." Event Details Name Second International 100% Renewable Energy Conference and Exhibition

325

VP 100: Retooling Michigan -- Yachts and Watts | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

VP 100: Retooling Michigan -- Yachts and Watts VP 100: Retooling Michigan -- Yachts and Watts VP 100: Retooling Michigan -- Yachts and Watts June 18, 2010 - 4:13pm Addthis Energetx Composites was able to purchase equipment such as this mold for utility-scale wind turbine blades thanks to a Recovery Act grant that matched the company’s $3.5 million investment. | Photo Courtesy of Energetx | Energetx Composites was able to purchase equipment such as this mold for utility-scale wind turbine blades thanks to a Recovery Act grant that matched the company's $3.5 million investment. | Photo Courtesy of Energetx | Joshua DeLung Near the eastern shore of Lake Michigan, there's a shift taking place. Tiara Yachts makes fiber composite structures for boats. Now the Holland, Mich.-based company is transforming part of its factory and using its 30

326

Development and Test of a Prototype 100MVA Superconducting Generator  

SciTech Connect (OSTI)

In 2002, General Electric and the US Department of Energy (DOE) entered into a cooperative agreement for the development of a commercialized 100 MVA generator using high temperature superconductors (HTS) in the field winding. The intent of the program was to: Identify and develop technologies that would be needed for such a generator. Develop conceptual designs for generators with ratings of 100 MVA and higher using HTS technology. Perform proof of concept tests at the 1.5 MW level for GEs proprietary warm iron rotor HTS generator concept. Design, build, and test a prototype of a commercially viable 100 MVA generator that could be placed on the power grid. This report summarizes work performed during the program and is provided as one of the final program deliverables.

Fogarty, James M.; Bray, James W.

2007-05-25T23:59:59.000Z

327

NA-ASC-100R-04-Vol.1-Rev.0  

National Nuclear Security Administration (NNSA)

100R-04-Vol.1-Rev.0 100R-04-Vol.1-Rev.0 August 2004 SAND 2004-3740P Issued by Sandia National Laboratories for NNSA's Office of Advanced Simulation & Computing, NA-114. For more information, contact Dr. Dimitri Kusnezov at dimitri.kusnezov@nnsa.doe.gov ON THE COVER: These experimental images show the evolution of three gaseous cylinders (seeded with a tracer gas) that have been accelerated by a planar shock wave. The flow fields are dominated by vortices created by the shock acceleration, so the swirling red flows are the SF6 gas being entrained by the vortices. The yellow is air. Each photo consists of two snapshots of the flow at two times (with time interval about 200 microseconds). These images are produced by a laser-induced fluorescence technique. In each image the structures are traveling from left to right at speeds of 100 m/s.

328

Algae to Bio-Crude in Less Than 60 Minutes  

ScienceCinema (OSTI)

Engineers have created a chemical process that produces useful crude oil just minutes after engineers pour in harvested algae -- a verdant green paste with the consistency of pea soup. The PNNL team combined several chemical steps into one continuous process that starts with an algae slurry that contains as much as 80 to 90 percent water. Most current processes require the algae to be dried -- an expensive process that takes a lot of energy. The research has been licensed by Genifuel Corp.

Elliott, Doug

2014-06-02T23:59:59.000Z

329

CORROSION ENGINEERING SECTION CORROSION--Vol. 60, No. 5 501  

E-Print Network [OSTI]

CORROSION ENGINEERING SECTION CORROSION--Vol. 60, No. 5 501 0010. Corrosion Behavior of Fe-Al-Cr Alloys in Sulfur- and Oxygen-Rich Environments in the Presence of Pyrite J considered as weld overlay coatings for corrosion protection. These alloys previously have been shown

DuPont, John N.

330

What is the QUAA? "A 60 Second Story"  

E-Print Network [OSTI]

What is the QUAA? "A 60 Second Story" What is the QUAA and what does it do? The QUAA is the alumni. What we share in common is a great Queen's experience, and we want to say thank you by getting involved with grants and awards. 2. To engage our alumni in what is going on at the University, the QUAA: · Works hand

Linder, Tamás

331

60 Years Since Nuclear Turned on the Lights  

Broader source: Energy.gov [DOE]

On the 60th anniversary of the worlds first nuclear power plant to produce electricity, Assistant Secretary for Nuclear Energy Peter Lyons discusses the Energy Department's and the Administration's commitment to promoting a nuclear renaissance in the United States.

332

Microsoft SQL Server 6.0{reg_sign} Workbook  

SciTech Connect (OSTI)

This workbook was prepared for introductory training in the use of Microsoft SQL Server Version 6.0. The examples are all taken from the PUBS database that Microsoft distributes for training purposes or from the Microsoft Online Documentation. The merits of the relational database are presented.

Augustenborg, E.C.

1996-09-01T23:59:59.000Z

333

Molecular surgical synthesis of H2@C60: recollections  

Science Journals Connector (OSTI)

...surgery|molecular hydrogen|endohedral fullerene...containing molecular hydrogen, H2@C60, made by...methodology for the production of endohedral fullerene...hard-to-control physical methods such as arc discharge...even for a pressurized hydrogen molecule to go through...

2013-01-01T23:59:59.000Z

334

GDI and VB 6.0 Drawing Example  

Science Journals Connector (OSTI)

Before I get into the inner workings of GDI+, I want to spend some time in the existing world of GDI. This chapter will give you an appreciation of the complexities of the GDI and VB 6.0 drawing to...

Nick Symmonds

2002-01-01T23:59:59.000Z

335

Microsoft Word - Bldg 100 Pilot Test.doc  

Office of Legacy Management (LM)

DOE-LM/GJ791-2005 DOE-LM/GJ791-2005 Pinellas Environmental Restoration Project Young - Rainey STAR Center Building 100 Area Enhanced Bioremediation Pilot Test Final Report January 2005 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado U.S. Department of Energy Building 100 Area Enhanced Bioremediation Pilot Test Final Report January 2005 Page ii Contents 1.0 Introduction......................................................................................................................... 1 2.0 Results from the May 2004 (P8) Sampling Event .............................................................. 1 3.0 Microorganism Data

336

Structure of the Si(100)-(22)In surface  

Science Journals Connector (OSTI)

The question of whether the Si(100)-(22)In reconstruction consists of orthogonal or parallel In ad-dimers was answered by performing studies, using scanning tunneling microscopy and impact-collision ion-scattering spectrometry (ICISS), on low coverages of In adsorbed on a vicinal Si(100) surface. The formation of a predominantly single domain of the (22) phase on the vicinal surface allowed us to use the ICISS experiments to distinguish between the orthogonal and parallel ad-dimer geometries. Our results strongly support the model involving the parallel ad-dimer, in agreement with previous theoretical predictions.

B. E. Steele; Lian Li; J. L. Stevens; I. S. T. Tsong

1993-04-15T23:59:59.000Z

337

U10.0 Undulator conceptual design report  

SciTech Connect (OSTI)

The U10.0 Undulator described here is a 43 period, 10 cm period, 4.5 meter long insertion device. Designed for the Advanced Light Source (ALS) storage ring at the Lawrence Berkeley Laboratory. This insertion device will provide high brightness, quasi-monochromatic radiation in the 5-950 eV energy range. This conceptual design report includes sections on: parameter development, spectral performance, and accelerator requirements, physics specifications and the detailed conceptual design of the magnetic structure, the support/drive systems, the insertion device control system, the vacuum system, and installation for the U10.0 Undulator.

Hoyer, E.

1994-06-01T23:59:59.000Z

338

A 100-kc modulation system for an EPR microwave spectrometer  

E-Print Network [OSTI]

A 100-kc FIELD MODULATION SYSTEM FOR AN EPR MICROWAVE SPECTROMETER A Thesis By Frank Edwin Stewart Approved as to style and content by: /I i r Chairman of Committee C ead of Dep rtment Member ember August 1964 ACM ONLEDGi PENT... LIST OF FIGURES FIGURE PAGE II-1 Molecular Structure of DPPH 22 II-2 11-3 III-1 IV-1 Hyperfine Splitting in the DPPH EPR Spectrum . 25 Hyperfine Splitting in the Mn EpR Spectrum , . 27 100-kc Field Modulation and Detection System . 4I Typical...

Stewart, Frank Edwin

2012-06-07T23:59:59.000Z

339

Data:D3047f3d-80d9-413e-aa32-cb915d7718b4 | Open Energy Information  

Open Energy Info (EERE)

f3d-80d9-413e-aa32-cb915d7718b4 f3d-80d9-413e-aa32-cb915d7718b4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Chelan County Effective date: 2012/01/01 End date if known: Rate name: Stehekin Small Industrial Small General Service Sector: Industrial Description: AVAILABILITY: This schedule is available in the Stehekin area, and is available to commercial, small industrial, farm power and applicable multiple-residential light, heat and power customers. CHARACTER OF SERVICE: 1. Service to be furnished under this schedule may be either single phase, three phase or four wire three phase, 60 cycle, alternating current at available phase and voltage. 2. Temporary service for commercial construction shall be supplied under this schedule. METERING: Where any customer requires service through two or more meters whether service is of similar or dissimilar class, each meter shall be billed independently.

340

Data:59cccc8b-d91b-43b9-94b8-0aabbf408192 | Open Energy Information  

Open Energy Info (EERE)

cccc8b-d91b-43b9-94b8-0aabbf408192 cccc8b-d91b-43b9-94b8-0aabbf408192 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Poudre Valley R E A, Inc Effective date: 2013/01/01 End date if known: Rate name: 5000PM - Commercial, Large - 5000kW & Above Primary Meter Sector: Commercial Description: Available to all primary metered consumers for commercial and industrial three-phase service, for all uses including lighting, power and heating for loads in excess of 5000 kW metered demand, subject to the established rules and regulations, tariffs, bylaws and Articles of Incorporation of the Association. Service: Three-phase, 60 hertz, at the Association's standard distribution voltages. The minimum monthly charge shall be the highest of the following:

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Data:1a77b249-dfe1-4eb0-8d80-605d5d610d32 | Open Energy Information  

Open Energy Info (EERE)

7b249-dfe1-4eb0-8d80-605d5d610d32 7b249-dfe1-4eb0-8d80-605d5d610d32 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Firelands Electric Coop, Inc Effective date: End date if known: Rate name: THREE-PHASE SCHOOLS Sector: Description: This schedule is available, by contract, throughout the Cooperative's entire service area subject to the established Rules and Regulations of the Cooperative. This service is applicable to all-electric school buildings which utilize electricity as the sole source of energy, and with the understanding that the building's electric demand load will be interrupted during periods of system peak demand as determined by the Cooperative. In the event that an extension, expansion, or enlargement of the Cooperative's system facilities is required, the Cooperative, in order to justify the investment and operational costs involved, at its option, may require a contribution in aid of construction or a larger monthly service charge depending upon the conditions involved. CHARACTER AND TYPE OF SERVICE: Three-phase, 60 Hertz, at 120/208 volts or 277/480 volts four-wire; or 240 volts or 480 volts three-wire; or other voltages as may be mutually agreeable.

342

Data:3c466e7c-b80a-48a0-971f-225830fe0c0a | Open Energy Information  

Open Energy Info (EERE)

6e7c-b80a-48a0-971f-225830fe0c0a 6e7c-b80a-48a0-971f-225830fe0c0a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Municipal Service Sector: Commercial Description: *Load management credit of $1.40/hp per month (minimum of $5.60 per month) during summer months (June-September) for customers with master metering and city controlled load management. Subject to production cost adjustment and power factor adjustment. Source or reference: http://www.ci.gothenburg.ne.us/Ordinances/2010_Current/868%20Utility%20Rates.pdf

343

Data:09ee9647-a302-439b-b8f1-d49d426e6d80 | Open Energy Information  

Open Energy Info (EERE)

ee9647-a302-439b-b8f1-d49d426e6d80 ee9647-a302-439b-b8f1-d49d426e6d80 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: 2012/05/20 End date if known: Rate name: General Service Rates -Rural Residential-Single Phase Sector: Residential Description: Additional Meters (Off-Peak Included) $ 3.60/Meter/Month Renewable Energy Market Adjustment $0.003/KWH Annual credit for a load leveler installation after 200 KWH/KW/12 Mo. $0.024/KWH (The homeowner determines his maximum KW demand level that the machine will allow during peak period.) (Closed) Source or reference: http://www.nodakelectric.com/wp-content/uploads/2011/04/General-Service-Rates-Farm-Rural-Residential-and-Small-Commercial.pdf

344

Data:67e8de14-e552-45d2-80bb-169bdbe13d93 | Open Energy Information  

Open Energy Info (EERE)

e8de14-e552-45d2-80bb-169bdbe13d93 e8de14-e552-45d2-80bb-169bdbe13d93 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Licking Rural Electric Inc Effective date: 2011/04/01 End date if known: Rate name: SMALL GENERAL SERVICE - SEASONAL RATE Sector: Commercial Description: Available in all territory served by the Cooperative, in accordance with the Cooperative's Service Rules and Regulations. APPLICABILITY Applicable to Small Commercial and General Service consumers requiring 50 kVA or less transformer capacity. The capacity of individual motors served under this schedule shall not exceed ten (10) horsepower, without the consent of the Cooperative. TYPE OF SERVICE Single-phase, 60 hertz, at available secondary voltages.

345

Data:51ccfeb6-20a4-4b10-80a3-ffbb22c06a0c | Open Energy Information  

Open Energy Info (EERE)

ccfeb6-20a4-4b10-80a3-ffbb22c06a0c ccfeb6-20a4-4b10-80a3-ffbb22c06a0c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co Effective date: 2011/10/01 End date if known: Rate name: GENERAL SERVICE - TIME OF USE Intermediate Sector: Commercial Description: Facilities Charge per Month Per annual maximum kW (minimum 20kW per Month): $0.60 /kW RULES AND REGULATIONS: Terms and conditions of this electric rate schedule and the General Rules and Regulations govern use of this service. APPLICATION OF SCHEDULE: This schedule is applicable to nonresidential Customers with one Meter providing electrical service.

346

Mechanism of methanol synthesis on Cu(100) and Zn/Cu(100) surfaces: Comparative dipped adcluster model study  

SciTech Connect (OSTI)

The mechanism of methanol synthesis from CO{sub 2} and H{sub 2} on Cu(100) and Zn/Cu(100) surfaces was studied using the dipped adcluster model (DAM) combined with ab initio Hartree-Fock (HF) and second-order Moeller-Plesset (MP2) calculations. On clean Cu(100) surface, calculations show that five successive hydrogenations are involved in the hydrogenation of adsorbed CO{sub 2} to methanol, and the intermediates are formate, dioxomethylene, formaldehyde, and methoxy. The rate-limiting step is the hydrogenation of formate to formaldehyde, and the Cu-Cu site is responsible for the reaction on Cu(100). The roles of Zn on Zn/Cu(100) catalyst are to modify the rate-limiting step of the reaction: to lower the activation energies of this step and to stabilize the dioxomethylene intermediate at the Cu-Zn site. The present comparative results indicate that the Cu-Zn site is the active site, which cooperates with the Cu-Cu site to catalyze methanol synthesis on a Cu-based catalyst. Electron transfer from surface to adsorbates is the most important factor in affecting the reactivity of these surface catalysts.

Nakatsuji, Hiroshi; Hu, Zhenming

2000-03-05T23:59:59.000Z

347

Neutron-Deuteron and Neutron-Neutron Total Cross Sections in the Range 25-60 MeV  

Science Journals Connector (OSTI)

Measurements of the n-d total cross section to a precision of 1% are reported for the energy range 25-60 MeV. Nearly monoenergetic neutron beams were used whose energy was determined to about 100 keV. The experimental values of ?nd for energies ?36 MeV are several percent larger than previous measurements in this range. Assuming charge symmetry, ?nn can be calculated from the T=1 phase shifts. The differences between experimental values of (?nd-?np) and ?nn calculations are small and fairly well accounted for by correction terms based on the method of Glauber.

F. P. Brady; W. J. Knox; R. L. Walraven; J. L. Romero

1972-10-01T23:59:59.000Z

348

Magnetotransport properties of lithographically defined lateral CoNi80Fe20 wires  

E-Print Network [OSTI]

magnetic tunneling junction. We observed four distinct peaks in the magnetoresis- tance MR curves) and an asymmetric shift in the MR peak positions of the Ni80Fe20 wires below a critical point of 20 K. This asymmet substrate using the optical lithography and a combination of soft and hard lift-off techniques. Arrays of Si

Adeyeye, Adekunle

349

260 Volume 80THE QUARTERLY REVIEW OF BIOLOGY Climate Change and Human Health: Risks and  

E-Print Network [OSTI]

negative impacts of global warming on human health by decreasing our use of fossil fuels. Specifically to the air by the burning of fossil fuels, and that such harm will only intensify in the future. How260 Volume 80THE QUARTERLY REVIEW OF BIOLOGY Climate Change and Human Health: Risks and Responses

Gotelli, Nicholas J.

350

System 80+{trademark} Standard Design: CESSAR design certification. Volume 11: Amendment I  

SciTech Connect (OSTI)

This report, entitled Combustion Engineering Standard Safety Analysis Report -- Design Certification (CESSAR-DC), has been prepared in support of the industry effort to standardize nuclear plant designs. These volumes describe the Combustion Engineering, Inc. System 80{sup +}{trademark} Standard Design. This volume 11 discusses Radiation Protection, Conduct of Operations, and the Initial Test Program.

Not Available

1990-12-21T23:59:59.000Z

351

J. Am. Cerum. SOC., 72 [5] 775-80 (1989) Processingof Boron Carbide-Aluminum Composites  

E-Print Network [OSTI]

J. Am. Cerum. SOC., 72 [5] 775-80 (1989) journal Processingof Boron Carbide-Aluminum Composites, Universityof California, Livermore, California 94550 The processing problems associated with boron carbide carbide, aluminum, processing, cermets.] I. Introduction ORON CARBIDE (B4C)+is a very hard (9.5+ in Mohs

Aksay, Ilhan A.

352

Fusion Engineering and Design 23 (1993) 69-80 69 North-Holland  

E-Print Network [OSTI]

Fusion Engineering and Design 23 (1993) 69-80 69 North-Holland Introduction and synopsis of the TITAN reversed-field-pinch fusion-reactor study Farrokh Najmabadi a, Robert W. Conn a, Robert A and Fusion Research, Unit'ersity of California, Los Angeles, CA 90024-1597, USA b Los Alamos National

Ghoniem, Nasr M.

353

System 80+{trademark} Standard Design: CESSAR design certification. Volume 3: Amendment I  

SciTech Connect (OSTI)

This report, entitled Combustion Engineering Standard Safety Analysis Report - Design Certification (CESSAR-DC), has been prepared in support of the industry effort to standardize nuclear plant designs. These documents describe the Combustion Engineering, Inc. System 80+{sup TM} Standard Design. This report, Volume 3, in conjunction with Volume 2, provides the design of structures, components, equipment and systems.

Not Available

1990-12-21T23:59:59.000Z

354

System 80+{trademark} Standard Design: CESSAR design certification. Volume 17: Amendment I  

SciTech Connect (OSTI)

This report, entitled Combustion Engineering Standard Safety Analysis Report -- Design Certification (CESSAR-DC), has been prepared in support of the industry effort to standardize nuclear plant designs. These volumes describes the Combustion Engineering, Inc. System 80+{trademark} Standard Design. This Volume 17 provides Appendix A of this report, closure of unresolved and Genetic Safety Issues.

Not Available

1990-12-21T23:59:59.000Z

355

Abstract B80: NK therapy for pediatric brain tumors of the posterior fossa  

Science Journals Connector (OSTI)

...Abstract B80: NK therapy for pediatric brain tumors of the posterior fossa William Benjamin...Anderson Cancer Center, Houston, Texas. Brain tumors are the second most common childhood...account for approximately 20% of pediatric brain tumors. They develop in the cerebellum...

William Benjamin Brugmann; Alvaro Laureano; Cecele Denman; Harjeet Singh; Helen Huls; Zaky Wafik; David Sandberg; Soumen Khatua; Dean Lee; Laurence Cooper; Vidya Gopalakrishnan

2014-10-15T23:59:59.000Z

356

~ Do you help the homeless or indigent? ~ Robert Mancini (`80) Scholarship for Community Service  

E-Print Network [OSTI]

~ Do you help the homeless or indigent? ~ 2012-2013 Robert Mancini (`80) Scholarship for Community. The scholarship is awarded to students who have demonstrated a commitment to helping the underprivileged. Carry a cumulative GPA of 3.0 or higher. 3. Demonstrate commitment to helping the underprivileged

Suzuki, Masatsugu

357

Gas Flowmeter Calibrations with the Working Gas Flow Standard NIST Special Publication 250-80  

E-Print Network [OSTI]

Gas Flowmeter Calibrations with the Working Gas Flow Standard NIST Special Publication 250-80 John of Standards and Technology U. S. Department of Commerce #12;ii Table of Contents Gas Flowmeter Calibrations with the Working Gas Flow Standard .......................... i Abstract

358

Star Formation Signatures in the Condensation Downstream of HH 80N  

E-Print Network [OSTI]

HH80N is one of the Herbig-Haro objects that have associated quiescent dense clumps. We report CO and CS BIMA observations that reveal star formation within the HH80N dense clump. The CO emission reveals clearly a bipolar molecular outflow centered on the dense clump. The CS emission traces a ring-like structure of radius ~0.24 pc. The CS kinematics shows that the ring is collapsing with an infall speed of ~0.6 km/s. The required mass to produce the collapse is in agreement with previous ammonia observations of the 20 solar mass core, which is embedded within the CS structure. However, we cannot discard that the ring structure is expanding driven by protostellar winds, if the CS abundance if unusually high and the CO momentum rate is much higher than that measured, due to inclination and optical depth effects. The properties of the molecular outflow and of the dense core suggest that it harbors a Class 0 object. There are also signatures of interaction of the HH 80/81/80N outflow with the dense gas. In partic...

Girart, J M; Viti, S; Williams, D A; Ho, P T P

2001-01-01T23:59:59.000Z

359

System 80+{trademark} Standard Design: CESSAR design certification. Volume 2: Amendment I  

SciTech Connect (OSTI)

This report, entitled Combustion Engineering Standard Safety Analysis Report - Design Certification (CESSAR-DC), has been prepared in support of the industry effort to standardize nuclear plant designs. These documents describe the Combustion Engineering, Inc. System 80+{sup TM} Standard Design. This report, Volume 2, in conjunction with Volume 3, provides the design of structures, components, equipment and systems.

Not Available

1990-12-21T23:59:59.000Z

360

System 80+{trademark} Standard Design: CESSAR design certification. Volume 1: Amendment I  

SciTech Connect (OSTI)

This report, entitled Combustion Engineering Standard Safety Analysis Report - Design Certification (CESSAR-DC), has been prepared in support of the industry effort to standardize nuclear plant designs. These Volumes, describe the Combustion Engineering, Inc. System 80+{sup TM} Standard Design. This document, Volume 1, provides an introduction and general description of plant and site envelope characteristics.

Not Available

1990-12-21T23:59:59.000Z

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

System 80+{trademark} Standard Design: CESSAR design certification. Volume 8: Amendment I  

SciTech Connect (OSTI)

This report, entitled Combustion Engineering Standard Safety Analysis Report -- Design Certification (CESSAR-DC), has been prepared in support of the industry effort to standardize nuclear plant designs. These volumes describe the Combustion Engineering, Inc. System 80{sup +}{trademark} Standard Design. This volume 8 provides a description of instrumentation and controls.

Not Available

1990-12-21T23:59:59.000Z

362

Fusion Engineering and Design 80 (2006) 99110 Nuclear performance assessment of ARIES-AT  

E-Print Network [OSTI]

Fusion Engineering and Design 80 (2006) 99­110 Nuclear performance assessment of ARIES-AT L.A. El-Guebaly, The ARIES Team Fusion Technology Institute, University of Wisconsin-Madison, 1500 Engineering Drive, Madison ARIES design always involves a significant change in the engineering system with emphasis on high

California at San Diego, University of

363

Photosynthesis Research 80: 447460, 2004. 2004 Kluwer Academic Publishers. Printed in the Netherlands.  

E-Print Network [OSTI]

Photosynthesis Research 80: 447­460, 2004. © 2004 Kluwer Academic Publishers. Printed in the Netherlands. 447 General appendix A list of photosynthesis conferences and of edited books in photosynthesis: edited books in photosynthesis, Helmut Metzner, photosynthesis conferences, symposia volumes, Jan Barth

Govindjee "Gov"

364

Photosynthesis Research 80: 113, 2004. 2004 Kluwer Academic Publishers. Printed in the Netherlands.  

E-Print Network [OSTI]

Photosynthesis Research 80: 1­13, 2004. © 2004 Kluwer Academic Publishers. Printed in the Netherlands. 1 Editorial Celebrating the millennium: historical highlights of photosynthesis research, Part 3 laureates in photosynthesis- related areas, Roger Stanier Abstract This paper introduces the third and final

Allen, John F.

365

Thermal stability of the endohedral fullerenes NaC60, NaC70, and PaC60  

Science Journals Connector (OSTI)

Nitrogen and phosphorus atoms enclosed in fullerenes keep their atomic ground-state configuration, and no charge transfer or covalent bonding to the cage occurs. These systems can be dissolved in organic solvents and reacted with addends without losing the atomic character of the guest atom. In this paper, we present a detailed study of the annealing behavior of NaC60, NaC70, PaC60, and of some NaC60 adducts. The disintegration of these systems, as recorded by electron paramagnetic resonance measurements, occurs in the temperature range between 400 K and 600 K. The results are in qualitative agreement with potential energy calculations and confirm the proposed escape mechanism that proceeds via bond formation of the trapped atom with the cage. It is found that other combinations of group-V elements with fullerenes, e.g., NaC84, PaC70, and AsaC60 are not stable at room temperature. The escape mechanism and the possibility of disabling this path are discussed.

M. Waiblinger; K. Lips; W. Harneit; A. Weidinger; E. Dietel; A. Hirsch

2001-01-09T23:59:59.000Z

366

Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer  

SciTech Connect (OSTI)

This Factory Acceptance Test Procedure (FAT) is for the Westinghouse 100 Ton Hydraulic Trailer. The trailer will be used for the removal of the 101-SY pump. This procedure includes: safety check and safety procedures; pre-operation check out; startup; leveling trailer; functional/proofload test; proofload testing; and rolling load test.

Aftanas, B.L. [Westinghouse Hanford Co., Richland, WA (United States)

1994-11-16T23:59:59.000Z

367

2006 B100 Quality Survey Results: Milestone Report  

SciTech Connect (OSTI)

In 2006, the National Renewable Energy Laboratory conducted a nationwide quality survey of pure biodiesel (B100) intended to be used as a blendstock. The study collected random samples throughout the United States and analyzed them for quality against the current and proposed ASTM D6751 fuel quality specifications.

Alleman, T. L.; McCormick, R. L.; Deutch, S.

2007-05-01T23:59:59.000Z

368

The interactions of water and perfluorodiethyl ether on Ru(100)  

SciTech Connect (OSTI)

We have studied the interactions of water and perfluorodiethyl ether on Ru(100) in order to model the effects of surface structure and humidity on the bonding and decomposition of perfluoroalkyl ether lubricants with metal surfaces. In order to understand the interactions on Ru(100), we have first investigated the interactions of each of these adsorbates alone on the clean surface. The interactions of water with Ru(100) have been studied using both thermal desorption spectroscopy (TDS) and electron energy loss spectroscopy (EELS). From these studies we conclude that a small amount of water dissociates on this surface (5--10% of a monolayer), but water is adsorbed in a predominantly molecular form on this surface with an increasing degree of hydrogen-bonding with increasing coverage. The effects of hydrogen and oxygen coadsorption on the interactions of water with this surface have also been studied using TDS. Finally, the interactions of coadsorbed water and perfluorodiethyl ether on Ru(100) have been investigated using TDS.

Leavitt, P.

1990-09-21T23:59:59.000Z

369

Radiation Protection Dosimetry Vol. 100, Nos 14, pp. 207209 (2002)  

E-Print Network [OSTI]

207 Radiation Protection Dosimetry Vol. 100, Nos 1­4, pp. 207­209 (2002) Nuclear Technology, Ship Research Institute, Tokyo, Japan §Institute of General and Inorganic Chemistry, Moscow, Russia. The dependence of the TL efficiency on the radiation dose was found to be linear up to 6 kGy for the 3 at.% Pr3

Chen, Reuven

370

Radiation Protection Dosimetry Vol. 100, Nos 14, pp. 7174 (2002)  

E-Print Network [OSTI]

71 Radiation Protection Dosimetry Vol. 100, Nos 1­4, pp. 71­74 (2002) Nuclear Technology Publishing (OSL) has become a very important method for radiation dosimetry. In many laboratories, it is replacing of this method for dosimetry and dating is basically dependent on this premise. There are, however, some reports

Chen, Reuven

371

FANUC Wire EDM Machine 100% Built in Japan  

E-Print Network [OSTI]

FANUC Wire EDM Machine Alpha 0iE 100% Built in Japan #12;Features of the Alpha iE Series Ai Pulse productive than ever. Any EDM can handle cutting flat work pieces; Fanuc's new "R" power supply allows-up of the following advanced functions: AWF skip function Retry skip function AWF result screen RE-machining

Gray, Jeffrey J.

372

100% Pet coke or pet coke blends combustion  

SciTech Connect (OSTI)

Information is outlined on the combustion of 100 percent petroleum coke or petroleum coke blends. Data are presented on NISCO overviews; fuel (coke) characteristics; delayed coke analysis (1995-96); limestone characteristics/effects; limestone preparation; ash characteristics; vortex finders; agglomerization; and NISCO performance results.

Swindle, D.L.

1996-12-31T23:59:59.000Z

373

100 Area electrical distribution fault and coordination report  

SciTech Connect (OSTI)

This report documents three-phase and line-to-ground fault values and time overcurrent coordination curves for the electrical utility distribution system located in the 100 Areas. Activities that may improve the coordination of the distribution system have also been identified. An evaluation of system coordination was performed. The results of this evaluation are listed in Appendix B. There are protective devices within the 100 Area distribution system that do not coordinate with one another throughout the Areas. There is also a mis-application of reclosing relays at the 100B Area. The impact of the mis-coordination and incorrect application of reclosing relays is that system selectivity is reduced. Equipment will still be protected against damaging currents, however more equipment will be de-energized than necessary during fault conditions. It is the opinion of the author of this report that the cases of mis-coordination listed above, and in Appendix B, do not significantly degrade the system protection system nor the reliability of the 100 Area distribution system. Therefore, immediate response to correct these problems is not recommended. However, a planned methodology, outlined in an Activity Plan, to correct these problems should be developed and implemented in the near future.

Webber, J.J. [ICF Kaiser Hanford Co., Richland, WA (United States)

1994-09-23T23:59:59.000Z

374

Chemistry 100 Fall 2011 Page 1 of 5  

E-Print Network [OSTI]

Chemistry 100 ­ Fall 2011 Page 1 of 5 The World of Chemistry ­ Course Syllabus Instructor Kirkwood Hall 212 Texts: Required: Chemistry in Context (CC) Course information is online through OnCourse. Course Objective(s): The primary goal of this course is to teach you about the chemistry that surrounds

Indiana University

375

Cantilever Epitaxy Process Wins R&D 100 Award  

Broader source: Energy.gov [DOE]

Sandia National Laboratories received an R&D 100 Award from R&D Magazine for development of a new process for growing gallium nitride on an etched sapphire substrate. The process, called cantilever epitaxy, promises to make brighter and more efficient green, blue, and white LEDs.

376

Commemoration of the 60th Annniversary of The Atomic Bomb Casualty...  

Broader source: Energy.gov (indexed) [DOE]

60th Annniversary of The Atomic Bomb Casualty CommissionRadiation Effects Research Foundation Commemoration of the 60th Annniversary of The Atomic Bomb Casualty Commission...

377

DOE Announces $60 Million in Projects to Accelerate Scientific Discovery  

Broader source: Energy.gov (indexed) [DOE]

0 Million in Projects to Accelerate Scientific 0 Million in Projects to Accelerate Scientific Discovery through Advanced Computing DOE Announces $60 Million in Projects to Accelerate Scientific Discovery through Advanced Computing September 7, 2006 - 8:53am Addthis WASHINGTON, D.C. - The U.S. Department of Energy's (DOE) Office of Science today announced approximately $60 million in new awards annually for 30 computational science projects over the next three to five years. The projects are aimed at accelerating research in designing new materials, developing future energy sources, studying global climate change, improving environmental cleanup methods and understanding physics from the tiniest particles to the massive explosions of supernovae. "Advanced computing is a critical element of President Bush's American

378

Variability in Measured Space Temperatures in 60 Homes  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Variability in Measured Space Variability in Measured Space Temperatures in 60 Homes David Roberts National Renewable Energy Laboratory Kerylyn Lay EnerNOC (formerly of the National Renewable Energy Laboratory) Technical Report NREL/TP-5500-58059 March 2013 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Variability in Measured Space Temperatures in 60 Homes David Roberts National Renewable Energy Laboratory Kerylyn Lay EnerNOC (formerly of the National Renewable Energy Laboratory)

379

Transport properties of individual C{sub 60}-molecules  

SciTech Connect (OSTI)

Electrical and thermal transport properties of C{sub 60} molecules are investigated with density-functional-theory based calculations. These calculations suggest that the optimum contact geometry for an electrode terminated with a single-Au atom is through binding to one or two C-atoms of C{sub 60} with a tendency to promote the ?sp{sup 2}-hybridization into an ?sp{sup 3}-type one. Transport in these junctions is primarily through an unoccupied molecular orbital that is partly hybridized with the Au, which results in splitting the degeneracy of the lowest unoccupied molecular orbital triplet. The transmission through these junctions, however, cannot be modeled by a single Lorentzian resonance, as our results show evidence of quantum interference between an occupied and an unoccupied orbital. The interference results in a suppression of conductance around the Fermi energy. Our numerical findings are readily analyzed analytically within a simple two-level model.

Granton, G. [Institute of Nanotechnology, Karlsruhe Institute of Technology, Campus North, D-76128 Karlsruhe (Germany)] [Institute of Nanotechnology, Karlsruhe Institute of Technology, Campus North, D-76128 Karlsruhe (Germany); Seiler, C.; Evers, F. [Institute of Nanotechnology, Karlsruhe Institute of Technology, Campus North, D-76128 Karlsruhe (Germany) [Institute of Nanotechnology, Karlsruhe Institute of Technology, Campus North, D-76128 Karlsruhe (Germany); Center for Functional Nanostructures, Karlsruhe Institute of Technology, Campus South, D-76131 Karlsruhe (Germany); Institut fr Theorie der Kondensierten Materie, Karlsruhe Institute of Technology, Campus South, D-76128 Karlsruhe (Germany); Bagrets, A. [Institute of Nanotechnology, Karlsruhe Institute of Technology, Campus North, D-76128 Karlsruhe (Germany) [Institute of Nanotechnology, Karlsruhe Institute of Technology, Campus North, D-76128 Karlsruhe (Germany); Steinbuch Center for Supercomputing, Karlsruhe Institute of Technology, D-76128 Karlsruhe (Germany); Venkataraman, L. [Department of Applied Physics and Applied Mathematics, Columbia University, New York, New York 10027 (United States)] [Department of Applied Physics and Applied Mathematics, Columbia University, New York, New York 10027 (United States)

2013-12-21T23:59:59.000Z

380

L Prize Competition Winner 60W Incandesent Replacement Lamp Update  

Broader source: Energy.gov (indexed) [DOE]

Technology Deployment Technology Deployment Working Group L Prize ® Competition Winner 60W Incandescent Replacement Lamp Update James E. Rannels, Senior Advisor L Prize Competition D&R International May 23, 2012 Philips Wins First L Prize 2 * August 3, 2011: Philips announced as winner of 60W replacement bulb category * Product distributed thru commercial and retail channels Image courtesy of Philips -...[O]nce an award is made the authorizing Act directs General Services Administration to develop federal purchasing schedules for solid-state lamps that meet or exceed the specifications laid out in the prize category-so long as it is cost effective. I hope the GSA begins this process soon.‖

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Summary report for 1990 inservice inspection (ISI) of SRS 100-L reactor tank  

SciTech Connect (OSTI)

The integrity of the SRS reactor tanks is a key factor affecting their suitability for continued service since, unlike the external piping system and components, the tanks are virtually irreplaceable. Cracking in various areas of the process water piping systems has occurred beginning in about 1960 as a result of several degradation mechanisms, chiefly intergranular stress corrosion cracking (IGSCC) and chloride-induced transgranular cracking. The primary objective of this inspection was to determine if the accessible welds and selected portions of base metal in the L Reactor tank wall contain any indications of IGSCC. This inspection included areas in and beyond the weld HAZ, extending out as far as two to three inches from the centerline of the welds, plus selected areas of base metal at the intersection of the main tank vertical and mid-girth welds. No evidence of such degradation was found in any of the areas examined. Further, additional inspections were conducted of areas that had been damaged and repaired during original fabrication, and on a sample of areas containing linear indications observed during the 1986 visual inspection of the tank. No evidence of IGSCC or other service induced degradation was detected in these areas, either. The inspection was initially planned to cover a minimum of 60% of the accessible welds, plus repair areas and a sample of the indications from the 1986 visual inspection. Direction was received from DOE while the inspection was in progress to expand the scope to cover 100% of the accessible weld areas, and the plan was adjusted accordingly. Initial setup of the tank, which prior to inspection contained Mark 60B target assemblies and nearly a full charge of Mark 22 fuel assemblies, began on October 15, 1990. The inspection was completed on April 12, 1991.

Morrison, J.M.; Loibl, M.W.

1991-07-12T23:59:59.000Z

382

Data:10b53552-1672-4179-8a7c-60cc77e9b430 | Open Energy Information  

Open Energy Info (EERE)

52-1672-4179-8a7c-60cc77e9b430 52-1672-4179-8a7c-60cc77e9b430 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Membership Corporation Effective date: 2009/07/01 End date if known: Rate name: OUTDOOR LIGHTING SERVICE Sodium Vapor, Enclosed 100 W Sector: Lighting Description: 9,500 Lumens, 100 W Availability - Available to individual consumers, in all territory served by the Cooperative, for purposes of lighting private outdoor areas or residential subdivision streets from dusk to dawn. This rate is subject to Wholesale Power Adjustments and North Carolina Sales Tax. Service under this schedule is subject to the Cooperative's established Service Rules and Regulations.

383

World Record White OLED Performance Exceeds 100 lm/W  

Broader source: Energy.gov [DOE]

Universal Display Corporation (UDC) has successfully demonstrated a record-breaking white organic light-emitting diode (WOLED) with a power efficacy of 102 lm/W at 1000 cd/m2 using its proprietary, high-efficiency phosphorescent OLED technology. This achievement represents a significant milestone for OLED technology, demonstrating performance that surpasses the power efficacy of incandescent bulbs with less than 15 lm/W and fluorescent lamps at 60-90 lm/W. Funded in part by DOE, UDC's achievement is a major step toward DOE's roadmap goal of a 150 lm/W commercial OLED light source by 2015.

384

S M Stoller Star Center-B100  

Office of Legacy Management (LM)

B100 B100 7030-226/Monthly Accutest Job Number: F27169 Sampling Date: 10/05/04 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D. Laboratory Director

385

S M Stoller Star Center-B100  

Office of Legacy Management (LM)

B100 B100 110406202 Accutest Job Number: F33040 Sampling Date: 07/06/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D. Laboratory Director

386

S M Stoller Star Center-B100  

Office of Legacy Management (LM)

B100 B100 Monthly Sampling, 110406202 Accutest Job Number: F25245 Sampling Date: 07/06/04 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D.

387

Structure of a Si(100)22-Ga surface  

Science Journals Connector (OSTI)

The 22 structure formed on a Ga-adsorbed Si(100) surface is determined using tensor low-energy electron diffraction. I-V curves of the parallel dimer model are in excellent agreement with those of the experiment, indicating that the actual surface has parallel dimer structure. Specific displacements of the topmost two surface layers (the protrusion of the Ga dimer toward the vacuum, the increase of the bond length of the Ga dimer, the stretching of the Si dimer, and the movement of the Si dimer toward the Ga dimer) with the elongation of the Si dimer back bond are observed in the optimized geometry. The Ga-Si bond angle measured from the Si(100) surface plane is recovered with these displacements from that of the ideal geometry where each bond length is assumed to be the sum of Pauling covalent radii. Subsurface layers are also deformed to keep the bond lengths near their bulk values.

H. Sakama; K. Murakami; K. Nishikata; A. Kawazu

1994-11-15T23:59:59.000Z

388

Silicon (100)/SiO2 by XPS  

SciTech Connect (OSTI)

Silicon (100) wafers are ubiquitous in microfabrication and, accordingly, their surface characteristics are important. Herein, we report the analysis of Si (100) via X-ray photoelectron spectroscopy (XPS) using monochromatic Al K radiation. Survey scans show that the material is primarily silicon and oxygen, and the Si 2p region shows two peaks that correspond to elemental silicon and silicon dioxide. Using these peaks the thickness of the native oxide (SiO2) was estimated using the equation of Strohmeier.1 The oxygen peak is symmetric. The material shows small amounts of carbon, fluorine, and nitrogen contamination. These silicon wafers are used as the base material for subsequent growth of templated carbon nanotubes.

Jensen, David S.; Kanyal, Supriya S.; Madaan, Nitesh; Vail, Michael A.; Dadson, Andrew; Engelhard, Mark H.; Linford, Matthew R.

2013-09-25T23:59:59.000Z

389

E-Print Network 3.0 - az80 magnesium alloy Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the original area of the plate was 100 in.2 Summary: submersion. Assuming a corrosion penetration rate of 250 mpy for this alloy in seawater, estimate the time... 1000 inchyr...

390

Octupole collectivity in {sup 98,100,102}Mo  

SciTech Connect (OSTI)

Excited states in {sup 98,100,102}Mo have been studied via the {sup 30}Si+{sup 168}Er-induced fission reaction at a beam energy of 142 MeV. Prompt {gamma} rays were detected with the EUROBALL III multidetector array. The level schemes are extended with more than 20 new transitions and interpreted in the framework of a soft-octupole vibration model.

Lalkovski, S.; Ilieva, S.; Minkova, A.; Minkov, N.; Kutsarova, T.; Lopez-Martens, A.; Korichi, A.; Huebel, H.; Goergen, A.; Jansen, A.; Schoenwasser, G.; Herskind, B.; Bergstroem, M.; Podolyak, Zs. [Department of Physics, University of Sofia, 1164 Sofia (Bulgaria); Institute for Nuclear Research and Nuclear Energy, BAS, 1784 Sofia (Bulgaria); Centre de Spectrometrie Nucleaire et de Spectrometrie de Masse, F-91405 Orsay Campus (France); Helmholtz-Institut fuer Strahlen-und Kernphysik, Universitaet Bonn, Nussallee 14-16, D-53115 Bonn (Germany); The Niels Bohr Institut, Blegdamsvej 17, DK-2100 Copenhagen (Denmark); INFN, Laboratori Nationali di Legnaro (Italy)

2007-01-15T23:59:59.000Z

391

Assessing Present-Day Forest Landscapes in the Context of Historical Disturbance Regimes  

E-Print Network [OSTI]

Spatial Scales 0 20 40 60 80 100 0 500 1000 1500 2000 2500 3000 0 20 40 60 80 100 0 500 1000 1500 2000 2500 3000 0 20 40 60 80 100 0 500 1000 1500 2000 2500 3000 %OldGrowth Years Before Present a) Province · Area of young patches has increased · Area of mature and old-growth patches has decreased

392

Looking Outside for Insights  

E-Print Network [OSTI]

% 0% 20% 40% 60% 80% 100% LM Sep '06 LM Sep '07 Improving Worsening Remaining the same 18% 14% 45% 58% 37% 28% 0% 20% 40% 60% 80% 100% LM Sep '06 LM Sep '07 Improving Worsening Remaining the same Getting the past year or two?" 7% 4% 44% 32% 49% 64% 0% 20% 40% 60% 80% 100% LM Sep '06 LM Sep '07 A lot A little

393

NETL Innovations Recognized with R&D 100 Awards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 NETL Innovations Recognized with R&D 100 Awards Washington, DC - Two technologies advanced by the Office of Fossil Energy's National Energy Technology Laboratory (NETL) in collaboration with strategic partners have been recognized by R&D Magazine as among the 100 most technologically significant products introduced into the commercial marketplace within the past year. This year's awards recognize NETL's partner, MDS Coating Technologies Corporation (MCT), for their work in developing an erosion-resistant nanocoating, and the efforts of NETL and partner Allegheny Technologies, Inc., in developing a method to monitor melting and refining of specialty metals. BlackGold® Nanocoating During aircraft operation, gas turbine engines are continuously exposed to erosive media that damage engine components. Nanostructured coatings applied to compressor airfoil surfaces can significantly reduce material loss, leading to improved engine performance and fuel efficiency. Researchers at MCT have designed an erosion-resistant nanocoating material and application process, which significantly reduces erosion of compressor airfoils. MCT teamed with scientists and engineers at NETL and Delta Air Lines to perform critical tests required for FAA certification needed to deploy the protective coating on commercial aircraft. The FAA-approved nanocoating has the potential to save the U.S. commercial aviation industry up to 100 million gallons of fuel annually and realize cost savings greater than $300 million per year at today's jet fuel prices.

394

Hanford 100-D Area Biostimulation Treatability Test Results  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory conducted a treatability test designed to demonstrate that in situ biostimulation can be applied to help meet cleanup goals in the Hanford Site 100-D Area. In situ biostimulation has been extensively researched and applied for aquifer remediation over the last 20 years for various contaminants. In situ biostimulation, in the context of this project, is the process of amending an aquifer with a substrate that induces growth and/or activity of indigenous bacteria for the purpose of inducing a desired reaction. For application at the 100-D Area, the purpose of biostimulation is to induce reduction of chromate, nitrate, and oxygen to remove these compounds from the groundwater. The in situ biostimulation technology is intended to provide supplemental treatment upgradient of the In Situ Redox Manipulation (ISRM) barrier previously installed in the Hanford 100-D Area and thereby increase the longevity of the ISRM barrier. Substrates for the treatability test were selected to provide information about two general approaches for establishing and maintaining an in situ permeable reactive barrier based on biological reactions, i.e., a biobarrier. These approaches included 1) use of a soluble (miscible) substrate that is relatively easy to distribute over a large areal extent, is inexpensive, and is expected to have moderate longevity; and 2) use of an immiscible substrate that can be distributed over a reasonable areal extent at a moderate cost and is expected to have increased longevity.

Truex, Michael J.; Vermeul, Vincent R.; Fritz, Brad G.; Mackley, Rob D.; Mendoza, Donaldo P.; Elmore, Rebecca P.; Mitroshkov, Alexandre V.; Sklarew, Deborah S.; Johnson, Christian D.; Oostrom, Martinus; Newcomer, Darrell R.; Brockman, Fred J.; Bilskis, Christina L.; Hubbard, Susan S.; Peterson, John E.; Williams, Kenneth H.; Gasperikova, E.; Ajo-Franklin, J.

2009-09-30T23:59:59.000Z

395

Preliminary characterization of the 100 area at Argonne National Laboratory  

SciTech Connect (OSTI)

This characterization report is based on the results of sampling and an initial environmental assessment of the 100 Area of Argonne National Laboratory. It addresses the current status, projected data requirements, and recommended actions for five study areas within the 100 Area: the Lime Sludge Pond, the Building 108 Liquid Retention Pond, the Coal Yard, the East Area Burn Pit, and the Eastern Perimeter Area. Two of these areas are solid waste management units under the Resource Conservation and Recovery Act (the Lime Sludge Pond and the Building 108 Liquid Retention Pond); however, the Illinois Environmental Protection Agency has determined that no further action is necessary for the Lime Sludge Pond. Operational records for some of the activities were not available, and one study area (the East Area Burn Pit) could not be precisely located. Recommendations for further investigation include sample collection to obtain the following information: (1) mineralogy of major minerals and clays within the soils and underlying aquifer, (2) pH of the soils, (3) total clay fraction of the soils, (4) cation exchange capacity of the soils and aquifer materials, and (5) exchangeable cations of the soils and aquifer material. Various other actions are recommended for the 100 Area, including an electromagnetic survey, sampling of several study areas to determine the extent of contamination and potential migration pathways, and sampling to determine the presence of any radionuclides. For some of the study areas, additional actions are contingent on the results of the initial recommendations.

Biang, C.; Biang, R.; Patel, P.

1994-06-01T23:59:59.000Z

396

Chemical Properties of Elements 99 and 100 [Einsteinium and Fermium  

DOE R&D Accomplishments [OSTI]

A description of some of the chemical properties and of the methods used in the separations of elements 99 [Einsteinium] and 100 [Fermium] are given. The new elements exhibit the properties expected for the tenth and eleventh actinide elements. Attempts to produce an oxidation state greater than III of element 99 have been unsuccessful. In normal aqueous media only the III state of element 100 appears to exist. The relative spacings of the elution peaks of the new elements in some separations with ion exchange resin columns are the same as the relative spacings of the homologous lanthanide elements. The results of experiments involving cation exchange resins with very concentrated hydrochloric acid eluant show that the new elements, like the earlier actinides, are more strongly complexed than the lanthanides. The new elements also exist partially as anions in concentrated hydrochloric acid, as do earlier actinide elements, and they may be partially separated from each other by means of ion exchange resins. With some eluants interesting reversals of elution positions are observed in the region Bk-Cf-99-100, indicating complex ion formation involving unusual factors.

Seaborg, G. T.; Thompson, S. G.; Harvey, B. G.; Choppin, G. R.

1954-07-23T23:59:59.000Z

397

Data:Bb610caf-fef5-46b8-80df-bf3ec1ddba26 | Open Energy Information  

Open Energy Info (EERE)

Bb610caf-fef5-46b8-80df-bf3ec1ddba26 Bb610caf-fef5-46b8-80df-bf3ec1ddba26 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elroy, Wisconsin (Utility Company) Effective date: 2009/01/22 End date if known: Rate name: Cp-2 Large Power Service between 100kW and 500kW Demand Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0510 per kilowatt-hour.

398

Data:64900cbf-7f80-4ced-9f0b-7761ae9fb51a | Open Energy Information  

Open Energy Info (EERE)

cbf-7f80-4ced-9f0b-7761ae9fb51a cbf-7f80-4ced-9f0b-7761ae9fb51a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shawano Municipal Utilities Effective date: 2007/08/20 End date if known: Rate name: Small Power TOD Sector: Commercial Description: monthly demand charge for 100 to 200 kw($6)+ distribution demand charge($1.5)=Fixed seasonal maximum demand charge($7.5) Discounts available to this rate include: PMD and TOD Source or reference: http://www.shawano.tv/id75.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

399

Data:Bbf127a0-b232-4c12-80b4-7413b78dc610 | Open Energy Information  

Open Energy Info (EERE)

Bbf127a0-b232-4c12-80b4-7413b78dc610 Bbf127a0-b232-4c12-80b4-7413b78dc610 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Ms-1 Street Lighting Service 100 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0509 per kilowatt-hour.

400

Data:A279fb2a-5499-4e80-942d-5b8e11c70363 | Open Energy Information  

Open Energy Info (EERE)

fb2a-5499-4e80-942d-5b8e11c70363 fb2a-5499-4e80-942d-5b8e11c70363 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2011/09/01 End date if known: Rate name: Small Commercial Single Phase Service Sector: Commercial Description: *The minimum monthly charge shall be the base charge plus $1.00 per kVA of installed transformer capacity in excess of 25 kVA. Source or reference: http://www.sawnee.com/documents/rates/SC.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Data:7d1a8f6a-6275-4828-9c80-27738fb6fd65 | Open Energy Information  

Open Energy Info (EERE)

a-6275-4828-9c80-27738fb6fd65 a-6275-4828-9c80-27738fb6fd65 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Orange & Rockland Utils Inc Effective date: 2012/04/01 End date if known: Rate name: SC16 Power Bracket Mercury Vapor Overhead and Underground 100w (Customer owned, full service, single bill) Sector: Description: APPLICABLE TO USE OF SERVICE FOR: Sales and delivery of electric power supply provided by the Company or delivery of electric power supply provided by an Energy Service Company under the Company's Retail Access Program for outdoor lighting of areas, beyond the limits of public streets, highways or roadways, for use of individuals and private or public organizations where existing distribution facilities are suitable for the service requested.

402

Data:Afa2468a-fec5-4d51-8982-bd7b965e80cf | Open Energy Information  

Open Energy Info (EERE)

Afa2468a-fec5-4d51-8982-bd7b965e80cf Afa2468a-fec5-4d51-8982-bd7b965e80cf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: Company Owned Street Lighting - DHPS 100 W Wood Pole Sector: Lighting Description: Public Purposes Rider = base rate x %2.85. Source or reference: http://www.avistautilities.com/services/energypricing/wa/elect/Pages/default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

403

Data:6719e7d8-c345-4442-9157-9afdec2b80d4 | Open Energy Information  

Open Energy Info (EERE)

d8-c345-4442-9157-9afdec2b80d4 d8-c345-4442-9157-9afdec2b80d4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bartholomew County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Public Street Lighting Service, Mercury Vapor Lamps, 3,500 Lumens, 100W (New Wood Pole) Sector: Lighting Description: The above rates for Standard Public Street Lighting Service are based on the costs of standard overhead service and standard wood poles. The Customer will be required to pay a one-time contribution-in-aide-of construction (CIAC) to cover the additional costs of any non-standard lighting service requested by the Customer. Non-standard public street lighting service consists of installations requiring more than one wood pole and special poles, transformers, line extensions, non-standard fixtures and lamps, or underground service. The CIAC shall be based on the difference between the cost to provide standard service and the actual cost of the non-standard service as per current standard cost .

404

Data:163e2f87-c95f-425b-adb4-d0c22a1f9c80 | Open Energy Information  

Open Energy Info (EERE)

3e2f87-c95f-425b-adb4-d0c22a1f9c80 3e2f87-c95f-425b-adb4-d0c22a1f9c80 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Medium Industrial Sector: Industrial Description: Medium Industrial: 9,000 to 100,000 KWH monthly Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

405

Data:Cfa49dc6-6d1f-4c92-bc8e-1d7c80c7364a | Open Energy Information  

Open Energy Info (EERE)

Cfa49dc6-6d1f-4c92-bc8e-1d7c80c7364a Cfa49dc6-6d1f-4c92-bc8e-1d7c80c7364a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Ohio Inc Effective date: 2013/05/06 End date if known: Rate name: Rate NSP - Private Outdoor Lighting for Non-Standard Units - 9,500 Lumen Sodium Vapor - 100 SV Watt Sector: Lighting Description: Applicable to service for outdoor lighting on private property with Company owned overhead lighting fixtures in the Company's entire territory where secondary distribution lines are adjacent to the premise to be served. Not applicable to service for lighting of dedicated or undedicated public thoroughfares.

406

Data:4f3cbeef-7f80-4e47-bb95-c0429e7458b5 | Open Energy Information  

Open Energy Info (EERE)

cbeef-7f80-4e47-bb95-c0429e7458b5 cbeef-7f80-4e47-bb95-c0429e7458b5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of New Glarus, Wisconsin (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Ms-1 Street Lighting Service Overhead 100 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0721 per kilowatt-hour.

407

Data:0cca9bb6-9ac5-4e80-8757-6d0e62f572dd | Open Energy Information  

Open Energy Info (EERE)

cca9bb6-9ac5-4e80-8757-6d0e62f572dd cca9bb6-9ac5-4e80-8757-6d0e62f572dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kit Carson Electric Coop, Inc Effective date: 2011/09/22 End date if known: Rate name: Lighting Service - Metered Wooden Pole - 175W M.V or 100 W HPS Sector: Lighting Description: Available to all consumers and within the Utility's service area, unless otherwise noted. Source or reference: www.kitcarson.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

408

Soil, Water and Forage Testing Laboratory Potassium recommendations applicable for  

E-Print Network [OSTI]

on 3-30-2012: soiltesting.tamu.edu CANOLA (1000 LBS/A) 120 110 100 90 80 75 70 65 60 50 40 CANOLA (1250 LBS/A) 120 110 100 90 80 75 70 65 60 50 40 CANOLA (1500 LBS/A) 120 110 100 90 80 75 70 65 60 50 40 CANOLA (1750 LBS/A) 140 125 115 105 95 85 80 75 70 60 50 CANOLA (2000 LBS/A) 140 125 115 105 95 85 80 75

409

Data:Ab21aecd-e7e8-447a-9108-80ef1ea46a4b | Open Energy Information  

Open Energy Info (EERE)

1aecd-e7e8-447a-9108-80ef1ea46a4b 1aecd-e7e8-447a-9108-80ef1ea46a4b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Small Power Service - Optional Time-of-Day More than 100kW Sector: Industrial Description: Application: This rate is optional to the Cp-1, Small Power Service customers if their monthly Maximum Measured Demand is in excess of 100 kilowatts (kW) per month for three or more months in a consecutive 12-month period, unless the customer exceeds the application conditions of the large power time-of-day schedule. Commitment to Community Program Rider Under provisions of 1999 Wisconsin Act 9 and 2005 Wisconsin Act 141, a municipal electric utility shall charge each customer a low-income assistance and energy efficiency fee. Fifty percent of the fees charged by the municipal utility shall be used for low-income assistance programs and the remainder will be used for energy efficiency programs. Low-income programs may include assistance to low-income households for weatherization and other energy conservation services, payment of energy bills or early identification or prevention of energy crises. Energy efficiency programs may include those programs designed to reduce the demand for natural gas or electricity or improving the efficiency of its use during any period. Cp-1 Small Power Service $7.50 per customer per month

410

I-80 16th St Off Ramp Snowmelt Low Temperature Geothermal Facility | Open  

Open Energy Info (EERE)

16th St Off Ramp Snowmelt Low Temperature Geothermal Facility 16th St Off Ramp Snowmelt Low Temperature Geothermal Facility Jump to: navigation, search Name I-80 16th St Off Ramp Snowmelt Low Temperature Geothermal Facility Facility I-80 16th St Off Ramp Sector Geothermal energy Type Snowmelt Location Cheyenne, Wyoming Coordinates 41.1399814°, -104.8202462° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

411

File:NREL-ca-80m.pdf | Open Energy Information  

Open Energy Info (EERE)

m.pdf m.pdf Jump to: navigation, search File File history File usage California Annual Average Wind Speed at 80 Meters Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 4.43 MB, MIME type: application/pdf) Description California Annual Average Wind Speed at 80 Meters Sources National Renewable Energy Laboratory Related Technologies Wind Creation Date 2010-01-15 Extent State Countries United States UN Region Northern America States California File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:04, 21 December 2010 Thumbnail for version as of 15:04, 21 December 2010 1,275 × 1,650 (4.43 MB) MapBot (Talk | contribs) Automated upload from NREL's "mapsearch" data

412

Comparison of 60-Hz electric fields and incandescent light as aversive stimuli controlling the behavior of rats  

SciTech Connect (OSTI)

Rats were exposed to two procedures which enabled them to press a lever to turn off a 90 or 100 kV/m 60-Hz electric field or, later in the study, illumination from an incandescent lamp. Under one procedure, a response turned off the stimulus for a fixed duration, after which the stimulus was turned on again. A response during the off-period restarted the fixed duration. None of the rats turned the field off reliably. Next, under an alternative procedure, pressing one lever turned the field off; pressing the other lever turned it back on; responding under those conditions differed little from that seen at 0 kV/m. Under both procedures, when illumination from an incandescent lamp served as the stimulus, each rat did turn the stimulus off, and performances varied with stimulus intensity. The results show that a 100 kV/m 60-Hz electric field is not sufficient to function as an aversive stimulus under two procedures where illumination from a lamp does function as an aversive stimulus.

Stern, S.; Laties, V.G.

1989-01-01T23:59:59.000Z

413

Preise in CHF inkl. 8.0 % MwSt. Zrichsee AOC  

E-Print Network [OSTI]

Weissweine Preise in CHF inkl. 8.0 % MwSt. Schweiz Zürich Zürichsee AOC Riesling-Sylvaner Staatskellerei, Werner Kuster, Rheinau 2010 75 cl 46.00 Staatsschreiber Cuvée blanc Préstige AOC Pinot noir.00 Schiterberger AOC Sauvignon blanc Landolt Weine, Zürich 2010 75 cl 49.00 Teufener AOC Pinot Gris Landolt Weine

Zürich, Universität

414

Study of hydrogen mixing within the combustion engineering system 80+ containment  

SciTech Connect (OSTI)

A scoping study is performed to determine how hydrogen distributes throughout an evolutionary, advanced pressurized water reactor (PWR) spherical containment given a variety of hydrogen inflows and delivery locations. The study uses MAAP and a preliminary containment design for the Combustion Engineering (C-E) System 80+{trademark} standard design as the bases for the detailed thermal-hydraulic analyses. Results are compared to applicable design criteria from the Advanced Light Water Reactor (ALWR) Requirements Document. The C-E System 80+ containment design is based on the Cherokee-Perkins System 80{sup R} spherical containment design, revised to accommodate ALWR Requirements Document design criteria. A feature of this design is the 500,000-gal in-containment refueling water storage tank (IRWST) located in the lower region of the containment building. This tank is the source for the safety injection and containment spray pumps, and the discharge location for the primary system safety and bleed valves. The containment design directs water accumulation on lower floors to the IRWST to preclude its depletion.

Hawley, J.T.; Hammersley, R.J.; Plys, M.G. (Fauske Associates, Inc., Burr Ridge, IL (USA))

1989-11-01T23:59:59.000Z

415

DOE - Office of Legacy Management -- Radium Chemical Co Inc - NY 60  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Radium Chemical Co Inc - NY 60 Radium Chemical Co Inc - NY 60 FUSRAP Considered Sites Site: RADIUM CHEMICAL CO., INC (NY.60 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: New York , New York NY.60-1 Evaluation Year: 1987 NY.60-1 Site Operations: Commercial Producer of Radium. NY.60-1 Site Disposition: Eliminated - Commercial site - EPA cleanup project NY.60-1 Radioactive Materials Handled: Yes NY.60-1 Primary Radioactive Materials Handled: Radium NY.60-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP Also see Documents Related to RADIUM CHEMICAL CO., INC NY.60-1 - Memorandum; A. Wallo to the File; Subject: FUSRAP review and elimination of the Radium Chemical Co. site in New York, NY; November

416

Comparative study of the alloying effect on the initial oxidation of Cu-Au(100) and Cu-Pt(100)  

SciTech Connect (OSTI)

Using in situ transmission electron microscopy, we show that the oxidation of the Cu-Au(100) results in the formation of Cu{sub 2}O islands that deeply embed into the Cu-Au substrate while the oxidation of the Cu-Pt(100) leads to the formation of Cu{sub 2}O islands that highly protrude above the Cu-Pt substrate. Their difference is attributed to the different mobilities of Pt and Au in the Cu base alloys for which the sluggish mobility of Pt in Cu results in trapped Pt atoms at the oxide/alloy interface while the faster mobility of Au in Cu leads to enhanced rehomogenization of the alloy composition.

Luo, Langli; Zhou, Guangwen, E-mail: gzhou@binghamton.edu [Department of Mechanical Engineering and Multidisciplinary Program in Materials Science and Engineering, State University of New York, Binghamton, New York 13902 (United States); Kang, Yihong [Department of Mechanical Engineering and Materials Science, University of Pittsburgh, Pittsburgh, Pennsylvania 15261 (United States); Yang, Judith C. [Department of Chemical and Petroleum Engineering, University of Pittsburgh, Pittsburgh, Pennsylvania 15261 (United States); Su, Dong; Stach, Eric A. [Center for Functional Nanomaterials, Brookhaven National Laboratory, Upton, New York 11973 (United States)

2014-03-24T23:59:59.000Z

417

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network [OSTI]

100 0 10 20 60 80 100 Co(II)EDTA2- Co(III)EDTA- Co sorb Dissociation Hanford (ERDF fines of contaminant migration. Identical experiments utilizing 20 different sediments from the Hanford region were at Hanford. Ln [Mn (g kg-1 ) of sediments] -4 -3 -2 -1 0 1 Co(III)EDTA-production(%) 0 20 40 60 80 100 y = 20

418

E-Print Network 3.0 - al ruido industrial Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ruido aleatorio. Fuentes de ... Source: Canarias, Instituto de Astrofisica de (IAC) Collection: Physics 20 Procesos estocasticos 0 10 20 30 40 50 60 70 80 90 100 Summary:...

419

E-Print Network 3.0 - acero fundido refractario Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collection: Mathematics 15 20 40 60 80 100 120 140 160 MATERIAL de ANODO Summary: (SOFC) 600-700 CCarbonato Li, KCarbonatos fundidos (MCFC) 200-220 Ccido...

420

E-Print Network 3.0 - agregados estables al Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

global da populao escolar ingressada no IST em 200809 Summary: % 40% 60% 80% 100% AL TP C ampus Casa permanente do agregado familiar Casa de familiares Casa arrendada... %...

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

A Practical Primer to LED Technology  

Energy Savers [EERE]

- A Measurement Issue 2011 LED Transformations, LLC 17 What's Different Highest Energy Efficiency 0 20 40 60 80 100 120 140 160 White Sodium High Pressure Sodium Compact...

422

XUV postionization of fragments of photodissociated C{sub 60}  

SciTech Connect (OSTI)

We report experimental evidence for the loss of neutral C, C{sub 2}, C{sub 3}, and C{sub 4} from photoexcited C{sub 60} and C{sub 70}. These species are detected by postionization with XUV radiation formed by four-wave mixing in Kr vapor. The fragments have been detected in the nascent distribution (i.e., before total disintegration of the fullerene-size molecular entities). A resonant autoionization transition in C atom has yielded an upper limit to the translational energy release for dissociation into C atoms. The detection of these products gives new insight into the fragmentation mechanism of fullerenes.

Lykke, K.R.

1995-06-01T23:59:59.000Z

423

SP-100 high-temperautre advanced radiator development. [Nb; C  

SciTech Connect (OSTI)

Under contract to NASA-Lewis Research Center, an advanced radiator concept design has been developed meeting SP-100 thermoelectric requirements. Carbon-carbon heat pipes are utilized to produce this lightweight, high performance radiator. Two fundamental feasibility issues had to be solved to enable the design: first, to produce a carbon-carbon heat pipe tube with integral fins, meeting both thermal and mechanical requirements; and second, to develop a coating that protects the carbon-carbon substrate from 875 K potassium working fluid.

Rovang, R.D.; Hunt, M.E. (Rocketdyne Div./Rockwell Int., 6633 Canoga Ave., Canoga Park, CA (USA)); Dirling, R.B. Jr. (Science Applications International Corp., 1720 E. Wilshire, Santa Ana, CA (USA)); Holzl, R.A. (Delta G Corporation, 9960-A Glenoaks Blvd., Sun Valley, CA (USA))

1991-01-05T23:59:59.000Z

424

Atmospheric-pressure gas breakdown from 2 to 100 MHz  

SciTech Connect (OSTI)

We report a detailed study of breakdown voltage of atmospheric-pressure helium gas between two parallel-plate electrodes from 2 to 100 MHz. Experimental data show that the breakdown voltage reduces initially with increasing frequency due to a diminishing contribution of drift-dominated electron wall loss and then begins to increase with increasing frequency. The latter is contrary to the current understanding that relies largely on the electron wall loss mechanism. Particle-in-cell simulation suggests that rapid oscillation of the applied voltage prevents electrons from reaching their maximum achievable kinetic energy, thus compromising the ionization efficiency and increasing the breakdown voltage.

Walsh, J. L.; Zhang, Y. T.; Iza, F.; Kong, M. G. [Department of Electronic and Electrical Engineering, Loughborough University, Loughborough, Leicestershire LE11 3TU (United Kingdom)

2008-12-01T23:59:59.000Z

425

0 50 100 150m DenisWinstonWalk  

E-Print Network [OSTI]

0 50 100 150m Sullivans Creek DenisWinstonWalk 16 16T 136 137 135 122 141 3J 3I3H 3G 82 52 51 50 44 118 117 43 56 124 125 142 54E 55A 55B 131 143 131A 131B 54 5 6 6A7 45A 2 46 88 88T1 A B D 45 46E 46H South Gardeners Soil Depot Canberry Bridge McPherson Bridge Oval Fellows RD SULLIVANS GARRAN COLLEGELANE

426

100 Area soil washing bench-scale test procedures  

SciTech Connect (OSTI)

This document describes methodologies and procedures for conducting soil washing treatability tests in accordance with the 100 Area Soil Washing Treatability Test Plan (DOE-RL 1992, Draft A). The objective of this treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. These data will be primarily used for determining feasibility of the individual unit operations and defining the requirements for a system, or systems, for pilot-scale testing.

Freeman, H.D.; Gerber, M.A.; Mattigod, S.V.; Serne, R.J.

1993-03-01T23:59:59.000Z

427

120-D-1 (100-D) ponds training plan  

SciTech Connect (OSTI)

This is the Environmental Restoration Contractor Team training plan for the 100-D Ponds treatment, storage, and disposal unit. This plan is intended to meet the requirements of WAC 173-303-330 and the Hanford Dangerous Waste Permit. The WAC 173-303-330(1)(d)(ii, v, vi) requires that personnel be familiar, where applicable, with waste feed cut-off systems, proper responses to groundwater contamination incidents, shutdown of operations, response to fire or explosion, and other process operation activities.

G. B. Mitchem

1997-12-31T23:59:59.000Z

428

Cyrogenic testing of 100 m superconducting power transmission test facility  

SciTech Connect (OSTI)

This follow-up study to the 1980 tests of a three-expander configuration are the final tests of the cryogenic system designed to cool the facility for testing 100 m superconducting power transmission cables. The system was modified to incorporate a fourth turbo expander remote from the refrigerator at the far end of the load. The system is described with a flow schematic. The tests performed and their results are presented with turbine operating conditions presented in a table. Summary and conclusions are followed by a discussion concerning the thermometry used on the cable and the + or - 10 mK accuracy quoted.

Gibbs, R.J.; Jensen, J.E.; Thomas, R.A.

1982-01-01T23:59:59.000Z

429

Certification of the Cessna 152 on 100% ethanol  

SciTech Connect (OSTI)

In June 1996, the Renewable Aviation Fuels Development Center (RAFDC) at Baylor University in Waco, Texas, received a Supplemental Type Certificate (STC) for the use of 100% ethanol as a fuel for the Cessna 152, the most popular training aircraft in the world. This is the first certification granted by the Federal Aviation Administration (FAA) for a non-petroleum fuel. Certification of an aircraft on a new fuel requires a certification of the engine followed by a certification of the airframe/engine combination. This paper will describe the FAA airframe certification procedure, the tests required and their outcome using ethanol as an aviation fuel in a Cessna 152.

Shauck, M.E.; Zanin, M.G.

1997-12-31T23:59:59.000Z

430

Vitrification testing of soil fines from contaminated Hanford 100 Area and 300 Area soils  

SciTech Connect (OSTI)

The suitability of Hanford soil for vitrification is well known and has been demonstrated extensively in other work. The tests reported here were carried out to confirm the applicability of vitrification to the soil fines (a subset of the Hanford soil potentially different in composition from the bulk soil) and to provide data on the performance of actual, vitrified soil fines. It was determined that the soil fines were generally similar in composition to the bulk Hanford soil, although the fraction <0.25 mm in the 100 Area soil sample appears to differ somewhat from the bulk soil composition. The soil fines are readily melted into a homogeneous glass with the simple additions of CaO and/or Na{sub 2}O. The vitrified waste (plus additives) occupies only 60% of the volume of the initial untreated waste. Leach testing has shown the glasses made from the soil fines to be very durable relative to natural and man-made glasses and has demonstrated the ability of the vitrified waste to greatly reduce the release of radionuclides to the environment. Viscosity and electrical conductivity measurements indicate that the soil fines will be readily processable, although with levels of additives slightly greater than used in the radioactive melts. These tests demonstrate the applicability of vitrification to the contaminated soil fines and the exceptional performance of the waste form resulting from the vitrification of contaminated Hanford soils.

Ludowise, J.D.

1994-05-01T23:59:59.000Z

431

NETL Technologies Garner R&D 100 Awards | Department of Energy  

Energy Savers [EERE]

NETL Technologies Garner R&D 100 Awards NETL Technologies Garner R&D 100 Awards July 8, 2010 - 1:00pm Addthis osgBullet enables engineers, designers, managers, or customers to try...

432

Microsoft Word - 2011_1205_Engstrom_RAP_100-K-comments.docx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

December 7, 2011 Page 1 of 4 By Dale Engstrom, HAB Issue Manager and RAP Vice-chair The Remedial InvestigationFeasibility Study for the 100-KR-1, 100-KR-2 and 100-KR-4 Operable...

433

SP-100 operational life model. Fiscal Year 1990 annual report  

SciTech Connect (OSTI)

This report covers the initial year`s effort in the development of an Operational Life Model (OLM) for the SP-100 Space Reactor Power System. The initial step undertaken in developing the OLM was to review all available documentation from GE on their plans for the OLM and on the degradation and failure mechanisms envisioned for the SP-100. In addition, the DEGRA code developed at JPL, which modelled the degradation of the General Purpose Heat Source based Radioisotope Thermoelectric Generator (GPHS-RTG), was reviewed. Based on the review of the degradation and failure mechanisms, a list of the most pertinent degradation effects along with their key degradation mechanisms was compiled. This was done as a way of separating the mechanisms from the effects and allowing all of the effects to be incorporated into the OLM. The emphasis was on parameters which will tend to change performance as a function of time and not on those that are simply failures without any prior degradation.

Ewell, R.; Awaya, H.

1990-12-14T23:59:59.000Z

434

1/f resistance noise complements anelasticity measurements of hydrogen motion in amorphous Pd80Si20  

Science Journals Connector (OSTI)

The time-dependent resistance fluctuations due to motion of H in amorphous PdSi metal films exhibit 1/f noise with two thermally activated peaks, one at 80 K and one shifting with H concentration between 160 and 130 K. The higher peak closely matches an internal-friction peak, showing that the same H hops can relax elastic strain and modulate resistance, while the lower peak reflects hops that do not relax strain. Thus resistance fluctuations and mechanical dissipation provide complementary probes of defect motion.

Neil M. Zimmerman and Watt W. Webb

1990-08-20T23:59:59.000Z

435

Preliminary design report: Babcock and Wilcox BR-100 100-ton rail/barge spent fuel shipping cask  

SciTech Connect (OSTI)

The purpose of this document is to provide information on burnup credit as applied to the preliminary design of the BR-100 shipping cask. There is a brief description of the preliminary basket design and the features used to maintain a critically safe system. Following the basket description is a discussion of various criticality analyses used to evaluate burnup credit. The results from these analyses are then reviewed in the perspective of fuel burnups expected to be shipped to either the final repository or a Monitored Retrievable Storage (MRS) facility. The hurdles to employing burnup credit in the certification of any cask are then outlines and reviewed. the last section gives conclusions reached as to burnup credit for the BR-100 cask, based on our analyses and experience. All information in this study refers to the cask configured to transport PWR fuel. Boiling Water Reactor (BWR) fuel satisfies the criticality requirements so that burnup credit is not needed. All calculations generated in the preparation of this report were based upon the preliminary design which will be optimized during the final design. 8 refs., 19 figs., 16 tabs.

none,

1990-02-01T23:59:59.000Z

436

U-100: Google Chrome Multiple Vulnerabilities | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Google Chrome Multiple Vulnerabilities 0: Google Chrome Multiple Vulnerabilities U-100: Google Chrome Multiple Vulnerabilities February 10, 2012 - 7:00am Addthis PROBLEM: Multiple vulnerabilities have been reported in Google Chrome, where some have an unknown impact and others can be exploited by malicious people to bypass certain security restrictions, manipulate certain data, and compromise a user's system. PLATFORM: Google Chrome 16.x ABSTRACT: A remote user can create a specially crafted content that, when loaded by the target user, will execute arbitrary code on the target system. The code will run with the privileges of the target user. Reference LINKS: Google Announcements and Release Channel Secunia Advisory SA47938 Security Tracker ID 1026654 IMPACT ASSESSMENT: High Discussion: Multiple vulnerabilities have been reported in Google Chrome, where some

437

S M Stoller Star Center-B100  

Office of Legacy Management (LM)

/19/06 /19/06 Technical Report for S M Stoller Star Center-B100 110406202 7031-877 Accutest Job Number: F41217 Sampling Date: 06/02/06 Report to: US Dept of Energy, Grand Jct Office 2597 B3/4 Road Grand Junction, CO 81503 ATTN: Contracts Department, PO# 24231 x Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference

438

PNM Resources 2401 Aztec NE, MS-Z100  

Broader source: Energy.gov (indexed) [DOE]

PNM Resources PNM Resources 2401 Aztec NE, MS-Z100 Albuquerque, NM 87107 505-241-2025 Fax 505 241-2384 PNMResources.com October 29, 2013 Mr. Christopher Lawrence Office of Electricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Submitted electronically via email to: Christopher.Lawrence@hq.doe.gov Dear Mr. Lawrence: Subject: Department of Energy (DOE)- Improving Performance of Federal Permitting and Review of Infrastructure Projects, Request for Information, 78 Fed. Reg. 53436 (Aug. 29, 2013) PNM Resources (PNMR) is an energy holding company with 2012 consolidated operating revenues of $1.3 billion. Through its regulated utilities, PNM and TNMP, PNMR serves electricity to more than 739,000 homes and businesses in New

439

LANL awards Recovery Act contract worth up to $100 million  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LANL Awards Recovery Act contract LANL Awards Recovery Act contract LANL awards Recovery Act contract worth up to $100 million TerranearPMC, LLC will haul demolition debris and soils from LANL's Recovery Act cleanup projects for disposal in licensed facilities. March 10, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

440

Acceptance test report for the Westinghouse 100 ton hydraulic trailer  

SciTech Connect (OSTI)

The SY-101 Equipment Removal System 100 Ton Hydraulic Trailer was designed and built by KAMP Systems, Inc. Performance of the Acceptance Test Procedure at KAMP`s facility in Ontario, California (termed Phase 1 in this report) was interrupted by discrepancies noted with the main hydraulic cylinder. The main cylinder was removed and sent to REMCO for repair while the trailer was sent to Lampson`s facility in Pasco, Washington. The Acceptance Test Procedure was modified and performance resumed at Lampson (termed Phase 2 in this report) after receipt of the repaired cylinder. At the successful conclusion of Phase 2 testing the trailer was accepted as meeting all the performance criteria specified.

Barrett, R.A.

1995-03-06T23:59:59.000Z

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Test results of applicative 100 W Stirling engine  

SciTech Connect (OSTI)

A small 100 W displacer-type Stirling engine, Ecoboy-SCM81, has been developed by a committee of the Japan Society of Mechanical Engineers (JSME). The engine contains unique features, including an expansion cylinder which is heated by either combustion gas or direct solar energy. Also, a simple cooling system rejects heat from the working fluid. A displacer piston has both heating and cooling inner tubes for the working fluid which flows to and from outer tubes. The outer tubes for heating were located at the top of the expansion cylinder and the outer tubes for cooling were located in the middle of the cylinder. A regenerator is located in the displacer piston. The components of the engine adopted some new technologies. For instance, a porous type matrix consisting of pressed zigzag stainless steel wires were adopted for the regenerator. The matrix is practical for Stirling engines because it can be made at low cost and the assembling process is simplified.

Hirata, Koichi [Saitama Univ., Urawa, Saitama (Japan). Dept. of Mechanical Engineering; Kagawa, Noboru [National Defense Academy, Yokosuka, Kanagawa (Japan). Dept. of Applied Physics; Takeuchi, Makoto [Suction Gas Engine Manufacturing Co., Ltd., Tokyo (Japan); Yamashita, Iwao [Tokyo Denki Univ., Tokyo (Japan). Dept. of Mechanical Engineering; Isshiki, Naotsugu [Nihon Univ., Tokyo (Japan); Hamaguchi, Kazuhiro [Hokkaido Polytechnic Coll., Otaru, Hokkaido (Japan)

1996-12-31T23:59:59.000Z

442

100 Area excavation treatability test plan. Revision 1  

SciTech Connect (OSTI)

This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992f). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications. The most recent applications are excavation of the 618-9 burial ground and partial remediation of the 316-5 process trenches (DOE-RL 1992a, 1992b). Both projects included excavation of soil and dust control (using water sprays). Excavation is a well-developed technology and equipment is readily available; however, certain aspects of the excavation process require testing before use in full-scale operations. These include the following: Measurement and control of excavation-generated dust and airborne contamination; verification of field analytical system capabilities; demonstration of soil removal techniques specific to the 100 Area waste site types and configurations. The execution of this treatability test may produce up to 500 yd{sub 3} of contaminated soil, which will be used for future treatability tests. These tests may include soil washing with vitrification of the soil washing residuals. Other tests will be conducted if soil washing is not a viable alternative.

Not Available

1993-08-01T23:59:59.000Z

443

Carbon nanotunnels form from single-walled carbon nanotubes interacting with a diamond (100)-(2 X 1) surface.  

SciTech Connect (OSTI)

A quantum chemical study of the interaction of (5,5), (7,7), (9,9) and (8,0) single-walled carbon nanotubes with a clean (100)-(2 x 1) diamond surface is reported. Stable structures with covalent bonds at the interface were found for carbon nanotubes oriented parallel or perpendicular to the dimer rows on the reconstructed (100) surface. The binding energy of the most stable (5,5) nanotube-diamond structure is 1.7 eV/{angstrom}, and is attributed to strong covalent bonds formed between the carbon nanotube and the diamond surface. The structure of the nanotube is distorted by adsorption on the surface such that it adopts a tunnel-like geometry. Two other nanotunnel geometries were found for the (5,5) nanotube, with binding energies of 1.39 and 1.09 eV/{angstrom}. In the most stable (5,5) nanotube-diamond structure the interaction between the nanotube and the diamond surface produces a 0.6 eV band gap near the Fermi level, but the metallic character of the nanotube is maintained in the two other, less strongly bound nanotunnel structures. No charge transfer occurs between the diamond surface and the nanotunnels in any of the three orientations. Binding energies decrease with increases in tube diameter, to the extent that one of the three nanotunnel structures is not formed by (9,9) carbon nanotubes.

Horner, D. A.; Sternberg, M.; Zapol, P.; Curtiss, L. A. (Center for Nanoscale Materials); ( MSD); (North Central Coll.)

2011-08-01T23:59:59.000Z

444

We present 7 mm continuum observations of the massive bipolar outflow source G192.163.82 with a resolution of 80 x 60 AU. A model of the  

E-Print Network [OSTI]

., Bally, J., Reipurth, B., Shepherd, D., & Watson, A. M. 1999, AJ, 117, 2919 Eisloffel, J., Mundt, R., Ray outflow (flow mass ~ 95 M , 2 kpc distance). The early B star is surrounded by an accretion disk 130 AU., Falle, S. A. E. G., & Raga, A. C. 1996, ApJL, 468, L103 Richer, J., Shepherd, D., Cabrit, S., Bachiller

Shepherd, Debra

445

EVIDENCE OF NON-THERMAL X-RAY EMISSION FROM HH 80  

SciTech Connect (OSTI)

Protostellar jets appear at all stages of star formation when the accretion process is still at work. Jets travel at velocities of hundreds of km s{sup 1}, creating strong shocks when interacting with the interstellar medium. Several cases of jets have been detected in X-rays, typically showing soft emission. For the first time, we report evidence of hard X-ray emission possibly related to non-thermal processes not explained by previous models of the post-shock emission predicted in the jet/ambient interaction scenario. HH 80 is located at the south head of the jet associated with the massive protostar IRAS 18162-2048. It shows soft and hard X-ray emission in regions that are spatially separated, with the soft X-ray emission region situated behind the region of hard X-ray emission. We propose a scenario for HH 80 where soft X-ray emission is associated with thermal processes from the interaction of the jet with denser ambient matter and hard X-ray emission is produced by synchrotron radiation at the front shock.

Lpez-Santiago, J. [Instituto de Matemtica Interdisciplinar, S. D. Astronoma y Geodesia, Facultad de Ciencias Matemticas, Universidad Complutense de Madrid, E-28040 Madrid (Spain)] [Instituto de Matemtica Interdisciplinar, S. D. Astronoma y Geodesia, Facultad de Ciencias Matemticas, Universidad Complutense de Madrid, E-28040 Madrid (Spain); Peri, C. S.; Benaglia, P. [Instituto Argentino de Radioastronoma (IAR), CCT La Plata (CONICET), C.C.5, 1894 Villa Elisa, Buenos Aires (Argentina)] [Instituto Argentino de Radioastronoma (IAR), CCT La Plata (CONICET), C.C.5, 1894 Villa Elisa, Buenos Aires (Argentina); Bonito, R. [Dipartimento di Fisica e Chimica, Universit di Palermo, Piazza del Parlamento 1, I-90134 Palermo (Italy)] [Dipartimento di Fisica e Chimica, Universit di Palermo, Piazza del Parlamento 1, I-90134 Palermo (Italy); Miceli, M. [INAF-Osservatorio Astronomico di Palermo, Piazza del Parlamento 1, I-90134 Palermo (Italy)] [INAF-Osservatorio Astronomico di Palermo, Piazza del Parlamento 1, I-90134 Palermo (Italy); Albacete-Colombo, J. F. [Universidad Nacional del COMAHUE, Monseor Esandi y Ayacucho, 8500 Viedma, Ro Negro (Argentina)] [Universidad Nacional del COMAHUE, Monseor Esandi y Ayacucho, 8500 Viedma, Ro Negro (Argentina); De Castro, E. [Dpto. de Astrofsica y CC. de la Atmsfera, Universidad Complutense de Madrid, E-28040 Madrid (Spain)] [Dpto. de Astrofsica y CC. de la Atmsfera, Universidad Complutense de Madrid, E-28040 Madrid (Spain)

2013-10-20T23:59:59.000Z

446

General Indicators: Change from  

E-Print Network [OSTI]

business day 80% -2% 100% - 100% 50% 83% Quality Inspections Completed 100% +7% 95% 100% 100% 100% 100% -2% 70% Key: See Definitions Document for descriptions of performance measures and specific color% 60% - All Districts Combined 0 Electric 0 District Breakdown Steam/Chilled Water Improvement

Webb, Peter

447

Thermal Reactions of Fullerene C60 with Iron(III) Acetylacetonate  

Science Journals Connector (OSTI)

Thermal reaction of solid mixtures of fullerene C60 with iron(III) acetylacetonate proceeds in the combustion mode; the composition...60...ratio in the initial mixture. The magnetization of iron-fullerene complex...

V. G. Isakova; E. A. Petrakovskaya; A. D. Balaev

2003-04-01T23:59:59.000Z

448

U.S. Utility-Scale Solar 60 Percent Towards Cost-Competition...  

Energy Savers [EERE]

U.S. Utility-Scale Solar 60 Percent Towards Cost-Competition Goal U.S. Utility-Scale Solar 60 Percent Towards Cost-Competition Goal February 12, 2014 - 11:05am Addthis News Media...

449

Hanford Site 100-N Area In Situ Bioremediation of UPR-100-N-17, Deep Petroleum Unplanned Release - 13245  

SciTech Connect (OSTI)

In 1965 and 1966, approximately 303 m{sup 3} of Number 2 diesel fuel leaked from a pipeline used to support reactor operations at the Hanford Site's N Reactor. N Reactor was Hanford's longest operating reactor and served as the world's first dual purpose reactor for military and power production needs. The Interim Action Record of Decision for the 100-N Area identified in situ bioremediation as the preferred alternative to remediate the deep vadose zone contaminated by this release. A pilot project supplied oxygen into the vadose zone to stimulate microbial activity in the soil. The project monitored respiration rates as an indicator of active biodegradation. Based on pilot study results, a full-scale system is being constructed and installed to remediate the vadose zone contamination. (authors)

Saueressig, Daniel G. [Washington Closure Hanford, 2620 Fermi, Richland, Washington, 99354 (United States)] [Washington Closure Hanford, 2620 Fermi, Richland, Washington, 99354 (United States)

2013-07-01T23:59:59.000Z

450

Dissociation of Water at the MgO(100)-Water Interface: Comparison of Theory with Experiment  

E-Print Network [OSTI]

Dissociation of Water at the MgO(100)-Water Interface: Comparison of Theory with Experiment MichaelVed: September 16, 1998 Dissociative chemisorption of H2O at the MgO(100)-water interface has been investigated) was used to image the density of occupied states on the MgO(100)/Mo(100) surface for various degrees

Goodman, Wayne

451

C60 nanoparticle quenching used as a biological label , Sally Mack2  

E-Print Network [OSTI]

molecules make the C60 clusters water-soluble. In a water soluble form, C60 can be used as an efficient by molecules of water 8-10 . The twenty inner water molecules and an outer shell of 60 hydrogen-bound water or transferred to a "lower energy" dye (acceptor). The efficiency of the non-radiative energy transfer is highly

Hammock, Bruce D.

452

Division of Information Information Systems Documentation Enterprise Systems Management Framework Version 6.0  

E-Print Network [OSTI]

Division of Information Information Systems Documentation Enterprise Systems Management Framework Version 6.0 Enterprise Systems Management Framework Version: 6.0 Date: 2 Jan 2008 Status: Endorsed Systems Management Framework Version 6.0 DOCUMENT DETAILS Document Number CIS 0002/200504466 Document

Botea, Adi

453

State and National Wind Resource Potential 30 Percent Capacity Factor at 80 Meters  

Wind Powering America (EERE)

Note - 50% exclusions are not cumulative. If an area is non-ridgecrest forest on FS land, it is just excluded at the 50% level one time. Note - 50% exclusions are not cumulative. If an area is non-ridgecrest forest on FS land, it is just excluded at the 50% level one time. 1) Exclude areas of slope > 20% Derived from 90 m national elevation dataset. 6) 100% exclude 3 km surrounding criteria 2-5 (except water) Merged datasets and buffer 3 km 5) 100% exclusion of airfields, urban, wetland and water areas. USGS North America Land Use Land Cover (LULC), version 2.0, 1993; ESRI airports and airfields (2006); U.S. Census Urbanized Areas (2000 and 2003) 10) 50% exclusion of non-ridgecrest forest Ridge-crest areas defined using a terrain definition script, overlaid with USGS LULC data screened for the forest categories. Other Criteria 8) 50% exclusion of remaining Dept. of Defense lands except

454

Beta-delayed proton emission in the 100Sn region  

E-Print Network [OSTI]

Beta-delayed proton emission from nuclides in the neighborhood of 100Sn was studied at the National Superconducting Cyclotron Laboratory. The nuclei were produced by fragmentation of a 120 MeV/nucleon 112Sn primary beam on a Be target. Beam purification was provided by the A1900 Fragment Separator and the Radio Frequency Fragment Separator. The fragments of interest were identified and their decay was studied with the NSCL Beta Counting System (BCS) in conjunction with the Segmented Germanium Array (SeGA). The nuclei 96Cd, 98Ing, 98Inm and 99In were identified as beta-delayed proton emitters, with branching ratios bp = 5.5(40)%, 5.5+3 -2%, 19(2)% and 0.9(4)%, respectively. The bp for 89Ru, 91,92Rh, 93Pd and 95Ag were deduced for the first time with bp = 3+1.9 -1.7%, 1.3(5)%, 1.9(1)%, 7.5(5)% and 2.5(3)%, respectively. The bp = 22(1)% for 101Sn was deduced with higher precision than previously reported. The impact of the newly measured bp values on the composition of the type-I X-ray burst ashes was studied.

Lorusso, G; Amthor, A; Baumann, T; Bazin, D; Berryman, J S; Brown, B A; Cyburt, R H; Crawford, H L; Estrade, A; Gade, A; Ginter, T; Guess, C J; Hausmann, M; Hitt, G W; Mantica, P F; Matos, M; Meharchand, R; Minamisono, K; Montes, F; Perdikakis, G; Pereira, J; Portillo, M; Schatz, H; Smith, K; Stoker, J; Stolz, A; Zegers, R G T

2012-01-01T23:59:59.000Z

455

Surface nano-patterning through styrene adsorption on Si(100)  

E-Print Network [OSTI]

We present an ab initio study of the structural and electronic properties of styrene molecules adsorbed on the dimerized Si(100) surface at different coverages, ranging from the single-molecule to the full monolayer. The adsorption mechanism primarily involves the vinyl group via a [2+2] cycloaddition process that leads to the formation of covalent Si-C bonds and a local surface derelaxation, while it leaves the phenyl group almost unperturbed. The investigation of the functionalized surface as a function of the coverage (e.g. 0.5 -- 1 ML) and of the substrate reconstruction reveals two major effects. The first results from Si dimer-vinyl interaction and concerns the controlled variation of the energy bandgap of the interface. The second is associated to phenyl-phenyl interactions, which gives rise to a regular pattern of electronic wires at surface, stemming from the pi-pi coupling. These findings suggest a rationale for tailoring the surface nano-patterning of the surface, in a controlled way.

A. Calzolari; A. Ruini; M. J. Caldas; E. Molinari

2005-07-27T23:59:59.000Z

456

Three-Part TINSSL Webinar Series: Understanding and Evaluating LM-79 & LM-80 Reports for SSL Technology  

Broader source: Energy.gov [DOE]

This three-day webinar series focused on the fundamentals of LM-79 and LM-80 luminaire testing requirements and the use of a checklist procedure for analyzing test reports.Participants also had...

457

Photonics Spectra, September 2007, pp. 80 83 (Preprint) Germanium Quantum Wells for High-Performance Modulators in  

E-Print Network [OSTI]

are very weak compared to those we use routinely in optoelectronic devices made from the III, September 2007, pp. 80 ­ 83 (Preprint) 2 optoelectronic devices, modulators have several further system

Miller, David A. B.

458

A Four-Valve Pulse Tube Cryocooler with a Cooling Power over 30 W at 80 K  

Science Journals Connector (OSTI)

A single stage four-valve pulse tube cryocooler with a large cooling power at 80 K has been built and ... investigating the influence of pulse tube size on cooling performance. Initial test demonstrated that the ...

R. Li; K. Kanao; N. Watanabe; Y. Kanazawa

1998-01-01T23:59:59.000Z

459

IESNA LM-80-08 An Overview of the Test Procedure and How it is Used for ENERGY STAR  

Broader source: Energy.gov [DOE]

This October 30, 2008 webcast provided an overview of LM-80-08, Approved Method for Measuring Lumen Maintenance of LED Light Sources, and how DOE's ENERGY STAR program for Solid-State Lighting (SSL...

460

Data:C1b84362-b883-44a4-80be-6114f8b80858 | Open Energy Information  

Open Energy Info (EERE)

4362-b883-44a4-80be-6114f8b80858 4362-b883-44a4-80be-6114f8b80858 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp Effective date: 2012/01/01 End date if known: Rate name: Church Demand - Three Phase* Sector: Commercial Description: *Applicable for all churches of the Cooperative who do not qualify for or who do not elect to receive service under other church rate schedules offered by the Cooperative. Determination of Billing Demand: The Billing Demand for any delivery point shall be based upon the highest 30-minute kW measurements during the current billing month and the preceding eleven (11) months. For the billing dates June 1 through September 30 and December 1 through February 28, the Billing Demand shall be the greater of: 1. 100% of the metered demand for the current month, or 2. 75% of the highest metered demand occurring in any previous applicable summer billing dates (June 1 - September 30). For all the billing dates of October 1 through November 30 and March 1 through May 31, the Billing Demand shall be the greater of: 1. 85% of the metered demand for the current month, or 2. 75% of the highest metered demand occurring in any previous applicable summer billing dates (June 1 - September 30). In no case shall the Billing Demand be less than the greater of (1) the minimum Billing Demand specified in the contract for service between the Cooperative and the member, or (2) 15 kW.

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

THE 0.5-2.22 {mu}m SCATTERED LIGHT SPECTRUM OF THE DISK AROUND TW Hya: DETECTION OF A PARTIALLY FILLED DISK GAP AT 80 AU  

SciTech Connect (OSTI)

We present a 0.5-2.2 {mu}m scattered light spectrum of the circumstellar disk around TW Hya from a combination of spatially resolved Hubble Space Telescope STIS spectroscopy and NICMOS coronagraphic images of the disk. We investigate the morphology of the disk at distances >40 AU over this wide range of wavelengths, and identify the presence of a depression in surface brightness at {approx}80 AU that could be caused by a gap in the disk. Additionally, we quantify the surface brightness, azimuthal symmetry, and spectral character of the disk as a function of radius. Our analysis shows that the scattering efficiency of the dust is largely neutral to blue over the observed wavelengths. We model the disk as a steady {alpha}-disk with an ad hoc gap structure. The thermal properties of the disk are self-consistently calculated using a three-dimensional radiative transfer code that uses ray tracing to model the heating of the disk interior and scattered light images. We find a good fit to the data over a wide range of distances from the star if we use a model disk with a partially filled gap of 30% depth at 80 AU and with a self-similar truncation knee at 100 AU. The origin of the gap is unclear, but it could arise from a transition in the nature of the disk's dust composition or the presence of a planetary companion. Based on scalings to previous hydrodynamic simulations of gap-opening criteria for embedded proto-planets, we estimate that a planetary companion forming the gap could have a mass between 6 and 28 M{sub Circled-Plus }.

Debes, John H. [Space Telescope Science Institute, Baltimore, MD 21218 (United States); Jang-Condell, Hannah [University of Wyoming, Laramie, WY 82071 (United States); Weinberger, Alycia J. [Department of Terrestrial Magnetism, Carnegie Institution of Washington, Washington, DC 20015 (United States); Roberge, Aki [Goddard Space Flight Center, Greenbelt, MD 20771 (United States); Schneider, Glenn [Steward Observatory, University of Arizona, Tuscon, AZ 85721 (United States)

2013-07-01T23:59:59.000Z

462

Electrospray and laser desorption ionization studies of C{sub 60}O and isomers of C{sub 60}O{sub 2}  

SciTech Connect (OSTI)

The reaction of C{sub 60} with ozone in toluene results in the formation of C{sub 60} oxides. C{sub 60}O and two isomers of C{sub 60} O{sub 2} were isolated; they both have the 423 nm absorption peak characteristic of an epoxide structure between adjacent 6,6-rings in C{sub 60}. Intact molecular ions are generated by electrospray ionization (ESI) without fragmentation. The enhanced ESI sensitivity of the higher oxides reflects the increase in electron affinity upon oxidation. In contrast to ESI, odd-numbered fragments are observed in laser desorption ionization (LDI) of C{sub 60}O. The two isomers of C{sub 60}O{sub 2} show different intensity distributions of the same fragment ions in LDI, suggesting different distances between the two oxygen atoms in them. Mechanisms are proposed for the formation of the two isomeric forms of C{sub 60}O{sub 2} and for mass spectrometric fragmentation processes. 14 refs., 5 figs.

Deng, J.P.; Mou, C.Y. [National Taiwan Univ., Taipei (Taiwan, Province of China); Han, C.C. [Inst. of Atomic and Molecular Sciences, Taipei (Taiwan, Province of China)

1995-10-12T23:59:59.000Z

463

Data:0e80b50c-faab-40da-9338-d6078a1bb0d4 | Open Energy Information  

Open Energy Info (EERE)

0c-faab-40da-9338-d6078a1bb0d4 0c-faab-40da-9338-d6078a1bb0d4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coweta-Fayette El Member Corp Effective date: End date if known: Rate name: Large Commercial Sector: Commercial Description: Rate Structure: Service charge: $45 First 10,000 kWh/mo. 12.80¢/kWh Over 10,000 kWh/mo. 10.60¢/kWh All consumption in excess of 200kWh per kW of demand, which is also in excess of 1,000 kWh 4.20¢/kWh All consumption in excess of 400 kWh per kW of demand, which is also in excess of 1,000 kWh 3.70¢/kWh Additional Info: Net Metering: Service to an electric consumer under which electric energy generated by the electric consumer from an eligible on-site generation facility and delivered to the local distribution facilities may be used to offset electric energy provide by the electric utility to the electric consumer during the applicable billing period. For additional information contact the EMC's engineering department.

464

What the NA60 dilepton data can tell  

E-Print Network [OSTI]

The NA60 experiment has studied low-mass muon pair production in In-In collisions at 158 AGeV with unprecedented precision. Thus, there is hope that the in-medium modifications of the vector meson spectral function can be constrained more thoroughly than from previous experiments. Towards this goal, we present a study comparing different models for the in-medium modification of vector mesons. In particular, we investigate what can be learned about collisional broadening by a medium at finite temperature and baryon density and what model independent constraints can be obtained from the data. Of special relevance is a comparison to $p_T$-cuts of the dilepton spectra. Those not only provide independent tests of the evolution model and $p_T$-dependence of the spectral function but also unambiguously decide if the observed yield in the higher mass spectrum $M > 1 {\\rm GeV}$ is mainly due to the hot phase of the evolution or four pion annihilation processes.

Thorsten Renk; Jorg Ruppert

2006-05-11T23:59:59.000Z

465

Trends in cobalt-60 research in nuclear science and technology  

Science Journals Connector (OSTI)

This paper quantitatively analyses the growth and development of cobalt-60 research in nuclear science and technology in terms of publications. As per the International Nuclear Information System (INIS) database during 2000-2007, a total of 5874 publications were published. The highest number of papers in a year (896) was in 2002. The average number of publications per year was 734.25. China topped the list with 960 (14.96%) publications followed by Japan with 600 (9.35%), India with 463 (7.21%), Brazil with 339 (5.28%), and the Russian Federation with 266 (4.14%). The authorship and collaboration trend is towards multiauthored papers. Researchers in China, Japan, the Russian Federation and the USA were inclined to work in larger groups. The highly productive institutions were Bhabha Atomic Research Centre, India, with 260 publications; Instituto de Pesquisas Energeticas e Nucleares (IPEN), Brazil with 151 publications; and Japan Atomic Energy Research Institute (JAERI), Japan with 94 publications. The journals most preferred by scientists for the publication of papers were Acta Agriculturae Nucleatae Sinica with 183 publications, followed by Chinese Journal of Radiological Medicine and Protection with 182 publications and Radiation Physics and Chemistry with 175 publications.

Anil Sagar; B.S. Kademani; R.G. Garg; Vijai Kumar

2010-01-01T23:59:59.000Z

466

Potential Internet Applications in Forest Products Exporting and  

E-Print Network [OSTI]

of Respondents #12;Adoption of Internet Technologies 0.0% 39.8% 57.0% 3.2% 0% 20% 40% 60% 80% 100 to Other Industries (n=93) #12;Adoption of Internet Technologies 2.2% 51.1% 22.8%23.9% 0% 20% 40% 60% 80 (n=54) 0% 20% 40% 60% 80% 100% Intranet Internet EDI Extranet VPN Do not use Use within next two

467

Data:Bc40832d-02e2-4e83-80c6-0355f283dce0 | Open Energy Information  

Open Energy Info (EERE)

Bc40832d-02e2-4e83-80c6-0355f283dce0 Bc40832d-02e2-4e83-80c6-0355f283dce0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Cadott, Wisconsin (Utility Company) Effective date: 2000/10/19 End date if known: Rate name: Pgs-2 Customer-Owned Generation Systems(20kW or less) Sector: Description: Availability Available for single-phase and three-phase customers where a part or all of the electrical requirements of the customer are supplied by the customer's generating facilities, where such facilities have a total generating capability of greater than 20 kW and less than or equal to 100 kW, where such facilities are connected in parallel with the utility. Customers not desiring to sell energy under this rate have the right to negotiate a buy-back rate. The energy rate indicated below is the minimum for electrical energy. Customers with generating facilities greater than 100 kW can negotiate a buy-back rate. Should the utility be unwilling to pay the minimum rate for electrical energy, the utility shall agree to transport such electrical energy to another utility that will pay such minimum rate. The utility shall recover actual costs of such transportation from the generating customer. Rate Customers shall receive monthly payments for all electricity delivered to the utility and shall be billed by the utility for metering and associated billing expenses specified in the latest rates of the wholesale supplier unless the latest rates of the wholesale supplier do not properly reflect avoided costs. In such event, the Commission, upon request, may determine appropriate rates. The utility shall have on file a copy of the latest customer-owned generation system rates for its wholesale supplier.

468

Data:Bff76528-6206-4d60-906c-850b24be8169 | Open Energy Information  

Open Energy Info (EERE)

Bff76528-6206-4d60-906c-850b24be8169 Bff76528-6206-4d60-906c-850b24be8169 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elroy, Wisconsin (Utility Company) Effective date: 2009/01/22 End date if known: Rate name: Cp-2 Large Power Service between 100kW and 500kW Demand Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0510 per kilowatt-hour.

469

Data:42f39f3d-bc80-422a-b5a6-8e9efa27fdb7 | Open Energy Information  

Open Energy Info (EERE)

f3d-bc80-422a-b5a6-8e9efa27fdb7 f3d-bc80-422a-b5a6-8e9efa27fdb7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Barron, Wisconsin (Utility Company) Effective date: 2009/07/15 End date if known: Rate name: Ms-1 Street and Security Lighting Service: 100 W HPS(Fiberglass) Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting and private security lighting. The utility will furnish, install, and maintain all lighting units. Metering: In lieu of metering each lamp unit, the utility will meter one or more of each size and type of lamp unit that operates for a similar time period each month. Each unit of the same size, type and on-time period shall be billed the average amount of energy as used by the metered unit(s) of the same size, type and on-time period. Pole Charges: Wood - Distribution $1.00 per lamp per month Wood- Stand Alone $3.25 per lamp per month Fiberglass $6.25 per lamp per month Steel $8.00 per lamp per month

470

American Economic Review 100 (June 2010): 763801 http://www.aeaweb.org/articles.php?doi=10.1257/aer.100.3.763  

E-Print Network [OSTI]

.1257/aer.100.3.763 Tax changes have been a major public policy issue in recent years. The tax cuts of 2001

Sadoulet, Elisabeth

471

Data:C81348a1-8888-4c16-afef-60d64a26be94 | Open Energy Information  

Open Energy Info (EERE)

8a1-8888-4c16-afef-60d64a26be94 8a1-8888-4c16-afef-60d64a26be94 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Utility District No 2 Effective date: 2011/10/01 End date if known: Rate name: Street Lighting 100 Watt HPS (cities) Sector: Lighting Description: Service under this schedule shall be available to municipalities, incorporated cities, towns or lighting districts for the illumination of streets, roadways, thoroughfares, and alleys. Lighting Structure: 35-foot wood pole $ 10.00 Source or reference: http://www.pacificpud.org/rate_street.html Source Parent: Comments Applicability

472

Data:9ba9fedf-a60f-434b-8636-544e349027b4 | Open Energy Information  

Open Energy Info (EERE)

fedf-a60f-434b-8636-544e349027b4 fedf-a60f-434b-8636-544e349027b4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Bern, North Carolina (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Area Lighting Schedule - Sodium Vapor 9500 Lumen 100w Sector: Lighting Description: Source or reference: www.newbern-nc.org/Elec/ElectricRates.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

473

Data:9ee5c44e-706c-43e6-8850-5527bb308e60 | Open Energy Information  

Open Energy Info (EERE)

e-706c-43e6-8850-5527bb308e60 e-706c-43e6-8850-5527bb308e60 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indiana Michigan Power Co (Michigan) Effective date: 2013/01/01 End date if known: Rate name: ECLS - 100 Watt MV Sector: Lighting Description: Energy Conversation Lighting Service Available for streetlighting service to municipalities, counties, and other governmental subdivisions. This rate is applicable for service that is supplied through new or rebuilt streetlight systems, including extension of streetlighting systems to additional locations where service is requested by customer.

474

Data:24ff6b2b-60cb-48b2-8721-eca6f973e10e | Open Energy Information  

Open Energy Info (EERE)

b-60cb-48b2-8721-eca6f973e10e b-60cb-48b2-8721-eca6f973e10e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Prairie Land Electric Coop Inc Effective date: 2010/01/14 End date if known: Rate name: Monthly Unmetered Investment Facility(MULT GLOBE 150W HPS-Option E) Sector: Lighting Description: Customer-100% Cooperative-0% Source or reference: http://www.prairielandelectric.com/Rates_PDF/MKEC%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

475

Data:3cfa9a60-9648-4189-ab29-c401a52c9af4 | Open Energy Information  

Open Energy Info (EERE)

a60-9648-4189-ab29-c401a52c9af4 a60-9648-4189-ab29-c401a52c9af4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Belmont, Wisconsin (Utility Company) Effective date: 2005/01/21 End date if known: Rate name: Rg-1 Residential Service Three Phase Sector: Residential Description: This rate will be applied to residential single phase customers for ordinary household purposes. Single-Phase motors may not exceed 5 horsepower individual-rated capacity without utility permission. Fixed Monthly Charge includes Commitment to Community Rider: $1.00 per customer per month Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=440

476

Data:6a1b1db7-dcce-449f-bb60-c29857b3ce79 | Open Energy Information  

Open Energy Info (EERE)

db7-dcce-449f-bb60-c29857b3ce79 db7-dcce-449f-bb60-c29857b3ce79 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Ohio Inc Effective date: 2013/05/06 End date if known: Rate name: Rate OL - Outdoor Lighting Service - SV 100 Watts - Holophane Decorative Sector: Lighting Description: Applicable for outdoor lighting services on private property with Company owned fixtures in the Company's entire service area where secondary distribution lines are adjacent to the premises to be served. Not applicable for lighting public roadways which are dedicated, or anticipated to be dedicated, except to meet the occasional singular need of a customer who has obtained written approval from the proper governmental authority.

477

Data:C1c41b60-03af-41f7-9164-be1815f94199 | Open Energy Information  

Open Energy Info (EERE)

b60-03af-41f7-9164-be1815f94199 b60-03af-41f7-9164-be1815f94199 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maui Electric Co Ltd Effective date: 2012/05/04 End date if known: Rate name: Maui-SCHEDULE F PUBLIC STREET LIGHTING-100/150/250 Watt High Pressure Sodium Sector: Lighting Description: Availability: Applicable to public street and highway lighting service supplied on the Island of Maui where the Company owns, maintains and operates the street lighting facilities. Minimum Charge: Fixture charge+$25.00 Source or reference: http://www.mauielectric.com/vcmcontent/FileScan/PDF/EnergyServices/Tarrifs/MECO/MauiRatesSchF.pdf

478

Data:89bf7bc1-889f-4043-91f7-cff52ceff60e | Open Energy Information  

Open Energy Info (EERE)

bc1-889f-4043-91f7-cff52ceff60e bc1-889f-4043-91f7-cff52ceff60e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stanton County Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Municipal Street Lighting District Owned Non Metered 100W HPS Sector: Commercial Description: Source or reference: ISU Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

479

Data:Eda7c419-60dd-45b9-92ff-7d8432c39c27 | Open Energy Information  

Open Energy Info (EERE)

Eda7c419-60dd-45b9-92ff-7d8432c39c27 Eda7c419-60dd-45b9-92ff-7d8432c39c27 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2012/08/01 End date if known: Rate name: 70 OL-8 100/150 HPS, Big Bay Sector: Lighting Description: Available to all Consumer's subject to Association's established rules and regulations. Association's standard outdoor lighting facilities. Service includes Association furnishing, operating, and maintaining lighting fixture, control equipment and lamp. When Association is required to alter its normal facilities to furnish a special outdoor lighting service, there will be an additional monthly charge.

480

The response of a fast phosphor screen scintillator (ZnO:Ga) to low energy ions (0-60 keV)  

SciTech Connect (OSTI)

ZnO:Ga is a promising, high time resolution candidate for use as a fast-ion-loss detector in TJ-II. We compare its ionoluminescence with that of the standard fast-ion-loss detector material, SrGa{sub 2}S{sub 4}:Eu (also known as TG-Green), when irradiated by H{sup +} ions with a range of energies E{<=}60 keV using a dedicated laboratory setup. It is found that ZnO:Ga is a reasonably good candidate for detecting low energy (E<60 keV) ions as it has excellent time resolution; however, its sensitivity is about 100 times lower than TG-Green, potentially limiting it to applications with high energy ion loss signals.

Jimenez-Rey, D. [Centro de Micro-Analisis de Materiales, Universidad Autonoma de Madrid, C/ Faraday 3, Campus de Cantoblanco, E-28049 Madrid (Spain); Zurro, B.; Baciero, A.; Navarro, M. [Laboratorio Nacional de Fusion, Asociacion Euratom-CIEMAT, Av. Complutense 22, E-28040 Madrid (Spain); Rodriguez-Barquero, L. [Laboratorio de Metrologia de Radiaciones lonizantes, CIEMAT, Av. Complutense 22, E-28040 Madrid (Spain)

2010-10-15T23:59:59.000Z

Note: This page contains sample records for the topic "100 80 60" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Interrelationship of endogenous and exogenous prostaglandins with uterine involution and postpartum interval in beef cows and heifers  

E-Print Network [OSTI]

versus C. 100 90 80 +I 70 60 e 50 +J 40 m 30 20 10 / / / / / 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 * Do not differ (p&, 05) Days postpartum Figure 6. Treatment effects on cumu1ative frequency of return to estrus... frequency of return to estrus in Hrangus cows. APP versus UP. 100 90 4J 70 60 o 50 40 E 30 20 10 / / / r , /~ I I / I / I / I / / I 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 * Differ at p&, 05 Days postpartum Treatment...

Tolleson, Douglas Ray

2012-06-07T23:59:59.000Z

482

Advanced Light Water Reactor Plants System 80+{trademark} Design Certification Program. Annual progress report, October 1, 1992--September 30, 1993  

SciTech Connect (OSTI)

The purpose of this report is to provide a status of the progress that was made towards Design Certification of System 80+{trademark} during the US government`s 1993 fiscal year. The System 80+ Advanced Light Water Reactor (ALWR) is a 3931 MW{sub t} (1350 MWe) Pressurized Water Reactor (PWR). The design consists of an essentially complete plant. It is based on evolutionary improvements to the Standardized System 80 nuclear steam supply system in operation at Palo Verde Units 1, 2, and 3, and the Duke Power Company P-81 balance-of-plant (BOP) that was designed and partially constructed at the Cherokee plant site. The System 80/P-81 original design has been substantially enhanced to increase conformance with the EPRI ALWR Utility Requirements Document (URD). Some design enhancements incorporated in the System 80+ design are included in the four units currently under construction in the Republic of Korea. These units form the basis of the Korean standardization program. The full System 80+ standard design has been offered to the Republic of China, in response to their recent bid specification. The ABB-CE Standard Safety Analysis Report (CESSAR-DC) was submitted to the NRC and a Draft Safety Evaluation Report was issued by the NRC in October 1992. CESSAR-DC contains the technical basis for compliance with the EPRI URD for simplified emergency planning. The Nuclear Steam Supply System (NSSS) is the standard ABB-Combustion Engineering two-loop arrangement with two steam generators, two hot legs and four cold legs each with a reactor coolant pump. The System 80+ standard plant includes a sperical steel containment vessel which is enclosed in a concrete shield building, thus providing the safety advantages of a dual containment.

Not Available

1993-12-31T23:59:59.000Z

483

Quantitative studies of transfer in vivo of low density, Sf 12-60, and Sf 60-400 lipoproteins between plasma and arterial intima in humans  

SciTech Connect (OSTI)

To assess the potential of various plasma lipoprotein classes to contribute to the lipid content of the arterial intima, influx and efflux of these plasma lipoprotein fractions into and from the intima of human carotid arteries were measured in vivo. While low density lipoprotein (LDL) is known to transfer from plasma into the arterial wall, there is less information on the atherogenic potential of lipoproteins of intermediate density (Sf 12-60) or of very low density (Sf 60-400). Aliquots of the same lipoprotein (LDL, Sf 12-60 lipoprotein particles, or Sf 60-400 lipoprotein particles) iodinated with iodine-125 and iodine-131 were injected intravenously 18-29 hours and 3-6 hours, respectively, before elective surgical removal of atheromatous arterial tissue, and the intimal clearance of lipoproteins, lipoprotein influx, and fractional loss of newly entered lipoproteins were calculated. Intimal clearance of Sf 60-400 particles was not detectable (less than 0.3 microliter x hr-1 x cm-2), whereas the average value for both LDL and Sf 12-60 lipoprotein particles was 0.9 microliter x hr-1 x cm-2. Since the fractional loss of newly entered LDL and Sf 12-60 lipoprotein particles was also similar, the results suggest similar modes of entry and exit for these two particles. However, due to lower plasma concentrations of Sf 12-60 lipoproteins as compared with LDL, the mass influx of cholesterol in the Sf 12-60 particles was on the order of one 10th of that in LDL, and that of apolipoprotein B was about one 20th.

Shaikh, M.; Wootton, R.; Nordestgaard, B.G.; Baskerville, P.; Lumley, J.S.; La Ville, A.E.; Quiney, J.; Lewis, B. (Guys Hospital, London, (United Kingdom))

1991-05-01T23:59:59.000Z

484

NEWBORN FOAL NOW WHAT? L. Chris Sanchez, DVM, PhD, DACVIM and Steeve Gigure, DVM, PhD, DACVIM*  

E-Print Network [OSTI]

dependent upon age: around 60 bpm (range 40-80) immediately after birth; increasing significantly over the first several hours of life ( 120 bpm); stabilizing between 80 and 100 bpm during week 1. Arrhythmias thereafter. Respiratory rate can normally rise to as high as 80 bpm for the first 60 minutes of life

Watson, Craig A.

485

Stakeholder Engagement and Outreach: Utility-Scale Land-Based 80-Meter Wind  

Wind Powering America (EERE)

Maps & Data Maps & Data Printable Version Bookmark and Share Utility-Scale Land-Based Maps Wind Resource Potential Offshore Maps Community-Scale Maps Residential-Scale Maps Anemometer Loan Programs & Data Utility-Scale Land-Based 80-Meter Wind Maps The U.S. Department of Energy provides an 80-meter (m) height, high-resolution wind resource map for the United States with links to state wind maps. States, utilities, and wind energy developers use utility-scale wind resource maps to locate and quantify the wind resource, identifying potentially windy sites within a fairly large region and determining a potential site's economic and technical viability. A wind resource map of the United States. Washington wind map and resources. Oregon wind map and resources. California wind map and resources. Idaho wind map and resources. Nevada wind map and resources. Arizona wind map and resources. Utah wind map and resources. Montana wind map and resources. Wyoming wind map and resources. North Dakota wind map and resources. South Dakota wind map and resources. Nebraska wind map and resources. Colorado wind map and resources. New Mexico wind map and resources. Kansas wind map and resources. Oklahoma wind map and resources. Texas wind map and resources. Minnesota wind map and resources. Iowa wind map and resources. Missouri wind map and resources. Arkansas wind map and resources. Lousiana wind map and resources. Wisconsin wind map and resources. Michigan wind map and resources. Michigan wind map and resources. Illinois wind map and resources. Indiana wind map and resources. Ohio wind map and resources. Kentucky wind map and resources. Tennessee wind map and resources. Mississippi wind map and resources. Alabama wind map and resources. Georgia wind map and resources. Florida wind map and resources. South Carolina wind map and resources. North Carolina wind map and resources. West Virginia wind map and resources. Virginia wind map and resources. Maryland wind map and resources. Pennsylvania wind map and resources. Delaware wind map and resources. New Jersey wind map and resources. New York wind map and resources. Maine wind map and resources. Vermont wind map and resources. New Hampshire wind map and resources. Massachusetts wind map and resources. Rhode Island wind map and resources. Connecticut wind map and resources. Alaska wind map and resources. Hawaii wind map and resources.

486

The 6th ASME-JSME Thermal Engineering Joint Conference March 16-20, 2003  

E-Print Network [OSTI]

40 60 80 100 120 140 20 40 60 80 100 120 140 Number of Carbon Atoms Intensity(arbitrary) (b) Ni-AJ03-221 A STUDY OF PRECURSOR CLUSTERS OF SINGLE-WALLED CARBON NANOTUBES (SWNTS) BY FT-ICR MASS-ICR, Cluster, Carbon Nanotube, Fullerene, Mass Spectroscopy ABSTRACT Single-walled carbon nanotubes (SWNTs) [1

Maruyama, Shigeo

487

Short- and medium-range order in Zr[subscript 80]Pt[subscript 20] liquids  

SciTech Connect (OSTI)

The atomic structures in equilibrium and supercooled liquids of Zr{sub 80}Pt{sub 20} were determined as a function of temperature by in situ high-energy synchrotron diffraction studies of the levitated liquids (containerless processing) using the beamline electrostatic levitation (BESL) technique. The presence of a pronounced pre-peak at q - 1.7 {angstrom}{sup -1} in the static structure factor indicates medium-range order (MRO) in the liquid. The position and intensity of the pre-peak remain constant with cooling, indicating that the MRO is already present in the liquid above its melting temperature. An analysis of the liquid atomic structures obtained using the Reverse Monte Carlo method utilizing both the structure factor S(q) from x-ray diffraction experiments and the partial pair-correlation functions from ab initio molecular dynamics simulations show that the pre-peak arises from a Pt-Pt correlation that can be identified with icosahedral short-range order around the Pt atoms. The local atomic ordering is dominated by icosahedral-like structures, raising the nucleation barrier between the liquid and these phases, thus assisting glass formation.

Mauro, N.A.; Wessels, V.; Bendert, J.C.; Klein, S.; Gangopadhyay, A.K.; Kramer, M.J.; Hao, S.G.; Rustan, G.E.; Kreyssig, A.; Goldman, A.I.; Kelton, K.F. (WU); (ETH Zurich); (Iowa State); (IMW-Germany)

2011-12-09T23:59:59.000Z

488

Discovery of Critical Oxygen Content for Glass Formation in Zr80Pt20 Melt Spun Ribbons  

SciTech Connect (OSTI)

Zr{sub 80}Pt{sub 20} alloys may form meta-stable quasicrystals either during devitrification of an amorphous phase or directly upon cooling from a liquid depending on processing conditions. To date, little attention has been given to the role of oxygen on the glass formation or devitrification behavior of Zr-Pt and similar alloys. This study reveals that oxygen content during melt spinning indeed strongly influences the formation of the as-quenched structure. A critical amount of oxygen was found to be required to form amorphous ribbons at a fixed quench rate. At lower oxygen levels (i.e., <500 ppm mass), a fully crystallized is formed; the structure is composed mainly of meta-stable {beta}-Zr with a small fraction of a quasicrystalline phase. At higher oxygen levels, the as-quenched structure transitions to a fully amorphous structure ({approx}1000 ppm mass), and with further oxygen addition forms a mixture of amorphous and quasicrystalline ({approx}1500 ppm mass) or crystalline phases (>2500 ppm mass). Details regarding the structure of the meta-stable {beta}-Zr phase in the low-oxygen ribbons are provided along with a discussion of the structural similarity between this phase and the quasicrystal structure that formed in this alloy.

D.J. Sordelet; E.A. Rozhkova; X. Yang; M.J. Kramer

2004-09-30T23:59:59.000Z

489

Integrated Ecogenomics Study for Bioremediation of Cr(VI) at Hanford 100H Area  

E-Print Network [OSTI]

reducer isolated from the Hanford 100H site capable of Iron(study for bioremediation of Cr(VI) at Hanford 100H area RomyVI)contamination at Hanford ?? Cr(VI) highly soluble, toxic

Chakraborty, Romy

2008-01-01T23:59:59.000Z

490

Tennessee: Da Vinci Fuel-in-Oil Reduces Emissions, Wins R&D 100...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Da Vinci Fuel-in-Oil Reduces Emissions, Wins R&D 100 Award Tennessee: Da Vinci Fuel-in-Oil Reduces Emissions, Wins R&D 100 Award August 19, 2013 - 5:07pm Addthis Developed jointly...

491

100 Meter Time of Flight System for Transmission Experiments Michael Rapp, Yaron Danon, Robert Block  

E-Print Network [OSTI]

100 Meter Time of Flight System for Transmission Experiments Michael Rapp, Yaron Danon, Robert of the detectors was chosen to take advantage of the neutron beam geometry at the detector location, 100 meters

Danon, Yaron

492

Alpha Emission Near 100Sn and the Termination of the rp Process  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Alpha Emission Near 100 Sn and the Termination of the rp Process The astrophysical rp-process is thought to reach a termination point in the region of 100 Sn, via the...

493

DOE Publishes Final Rule for the Request for Exclusion of 100...  

Broader source: Energy.gov (indexed) [DOE]

the Request for Exclusion of 100 Watt R20 Short Incandescent Reflector Lamps from Energy Conservation Standards DOE Publishes Final Rule for the Request for Exclusion of 100 Watt...

494

CAMPUS TUTORING RESOURCE GUIDE ACCESS Williston Hall Room 100 PH: (815) 753-0203  

E-Print Network [OSTI]

CAMPUS TUTORING RESOURCE GUIDE ACCESS ­ Williston Hall ­ Room 100 PH: (815) 753-0203 http ACCY 206, 207, 288 ACCESS/PAL Tutoring Various Locations and times 753-0203 For Info Williston 100 Mon

Karonis, Nicholas T.

495

Structural and electronic properties of Bi-adsorbate-stabilized reconstructions on the InP(100) and GaAsxN1?x(100) surfaces  

Science Journals Connector (OSTI)

Bismuth (Bi) adsorbate-stabilized reconstructions on the InP(100) and GaAsxN1?x(100) surfaces have been studied by scanning tunneling microscopy (STM) and spectroscopy (STS), x-ray photoelectron spectroscopy, and low-energy electron diffraction. With decreasing coverage, Bi is found to stabilize the (21), (28), and (24) reconstructions on the InP(100) surface and the (21) and (24) reconstructions on the GaAsxN1?x(100). STM results show that both the Bi?InP(100)(24) and Bi?GaAsxN1?x(100)(24) reconstructions can be described with the ?2-like structural model. The current-voltage curves measured by STS show the Bi?InP(100)(21) and Bi?GaAsxN1?x(100)(21) structures, which do not obey the electron counting model, to be semiconducting and metallic, respectively. Combining our experimental findings, we propose atomic models for the (21) reconstructions. An issue why Bi stabilizes unusual (21) structures is discussed.

P. Laukkanen; J. Pakarinen; M. Ahola-Tuomi; M. Kuzmin; R. E. Perl; I. J. Vyrynen; A. Tukiainen; J. Konttinen; P. Tuomisto; M. Pessa

2006-10-04T23:59:59.000Z

496

Influence of sulfate reducing bacterial biofilm on corrosion behavior of low-alloy, high-strength steel (API-5L X80)  

E-Print Network [OSTI]

-strength steel (API-5L X80) Faisal M. AlAbbas a,*, Charles Williamson b , Shaily M. Bhola a , John R. Spear b in revised form 25 October 2012 Accepted 25 October 2012 Available online Keywords: Carbon steel API 5L X80. This work investigates microbiologically influenced corrosion (MIC) of API 5L X80 linepipe steel by sulfate

497

United States- Land Based and Offshore Annual Average Wind Speed at 100 Meters  

Broader source: Energy.gov [DOE]

Full-size, high resolution version of the 100-meter land-based and offshore wind speed resource map.

498

Deep Co penetration and spin-polarization of C{sub 60} molecules at hybridized Co-C{sub 60} interfaces  

SciTech Connect (OSTI)

We used near-edge x-ray absorption fine structure spectroscopy to identify the interplays at organic semiconductor-ferromagnet interfaces. When monitoring the L-edge intensity of 0.36?nm Co depositing on C{sub 60} films of various thicknesses, we detected weaker Co signal from structures with larger C{sub 60} thicknesses. Having determined that the electron mean escape depth in C{sub 60} is 4.9?nm, further model analysis indicates that the decline of spectral intensity is due to deep penetration of Co clusters. Finally, C K-edge spectra reveal clear evidences of orbital hybridization between Co and C{sub 60} as well as a visible dichroic effect at 125?K.

Cheng, Pei-Yu; Chan, Yuet-Loy; Hsu, Yao-Jane [National Synchrotron Radiation Research Center, 30076 Hsinchu, Taiwan (China); Chiang, Meng-Ruei [National Synchrotron Radiation Research Center, 30076 Hsinchu, Taiwan (China); Graduate Program for Science and Technology of Synchrotron Light Source, National Tsing Hua University, 30013 Hsinchu, Taiwan (China); Department of Engineering and System Science, National Tsing Hua University, 30013 Hsinchu, Taiwan (China); Wang, Pen-Cheng [Graduate Program for Science and Technology of Synchrotron Light Source, National Tsing Hua University, 30013 Hsinchu, Taiwan (China); Department of Engineering and System Science, National Tsing Hua University, 30013 Hsinchu, Taiwan (China); Wei, D. H., E-mail: dhw@nsrrc.org.tw [National Synchrotron Radiation Research Center, 30076 Hsinchu, Taiwan (China); Graduate Program for Science and Technology of Synchrotron Light Source, National Tsing Hua University, 30013 Hsinchu, Taiwan (China); Department of Physics, National Sun Yat-Sen University, 80424 Kaohsiung, Taiwan (China)

2014-01-27T23:59:59.000Z

499

Determination of the absolute K through O conversion coefficients of the 80-keV M4 transition in Irm193  

Science Journals Connector (OSTI)

We produced carrier-free, nearly isotopically pure Irm193 from thermal-neutron irradiation of Os192. From studies of the conversion-electron spectrum, the photon spectrum, and the absolute counting rates, we determined the absolute K, L1, L2, L3, M1, M3, M5, N, and O+P conversion coefficients for the first time. With possibly one exception, these values agree closely with theoretical calculations. The value for the energy of the unconverted gamma ray was found to be 80.220.02 keV. The half-life for Irm193 determined by absolute electron counting in a proportional counter of 100% counting efficiency (4??) was found to be 10.530.04 d. We have determined the L1 subshell fluorescence yield, ?1, to be 0.1200.003 for iridium. Based upon our measurements of initial and final L subshell vacancies together with a best-fit literature value for ?2, we have found a plausible value for the Coster-Kronig coefficient f12 to be 0.0910.011.

M. Lindner; R. Gunnink; R. J. Nagle

1987-09-01T23:59:59.000Z

500

Study of the [(Co45Fe45Zr10)x(Al2O3)100?x/a-Si:H]m multilayer nanostructure by polarized neutron reflectometry  

Science Journals Connector (OSTI)

Polarized neutron reflectometry was used to investigate the amorphous multilayer nanostructures [(Co45Fe45Zr10)x(Al2O3)100?x/a-Si:H]m, whose magnetic properties are dependent on the concentration of the magnetic constituent (x=34, 47 and 60at%) as well as on the thicknesses of the metal-dielectric (Co45Fe45Zr10)x(Al2O3)100?x and semiconductor a-Si:H layers. The average magnetization of the individual magnetic layer is found to be inhomogeneous with the magnetically active central part and two magnetically dead parts at the interfaces.

E.A. Dyadkina; S.V. Grigoriev; D. Lott; A.V. Sitnikov; Y.E. Kalinin

2011-01-01T23:59:59.000Z