|
| Full Text: |
L E G A C Y
 9 Mb
View Full Text
Access Individual Pages
- Search, view and/or download individual pages
|
| Title: |
Final design, installation and baseline testing of 500 kW direct contact pilot plant at East Mesa |
| Creator/Author: |
Hlinak, A.
;
Lobach, J.
;
Nichols, K.
;
Olander, R.
;
Werner, D.
|
| Publication Date: | None |
| OSTI Identifier: | OSTI 6990612 |
| Report Number(s): | LBL-11153 |
| DOE Contract Number: | W-7405-ENG-48 |
| Document Type: | Technical Report |
| Specific Type: | |
| Coverage: | |
| Resource Relation: | |
| Other Number(s): | |
| Research Org: | Barber-Nichols Engineering Co., Arvada, CO (USA) |
| Sponsoring Org: | Not Available |
| Subject: | 15 GEOTHERMAL ENERGY; GEOTHERMAL POWER PLANTS; DESIGN; DIRECT CONTACT HEAT EXCHANGERS; PILOT PLANTS; TESTING; 2-METHYLPROPANE; EAST MESA GEOTHERMAL FIELD; FIELD TESTS; POWER RANGE 100-1000 KW; TEST FACILITIES; ALKANES; FUNCTIONAL MODELS; GEOTHERMAL FIELDS; HEAT EXCHANGERS; HYDROCARBONS; ORGANIC COMPOUNDS; POWER PLANTS; THERMAL POWER PLANTS |
| Keywords: | Geothermal Legacy |
| Description/Abstract: | The pilot plant was configured to accomplish two objectives - first to evaluate the overall performance potential of direct contact powerplants and second to develop design criteria and parameters for full-scale direct contact plants. The pilot plant includes all of the process functions that would be incorporated in a full-scale plant. Incoming brine is treated to remove undissolved gases, pumped through the direct contact heat exchanger (DCHX), and then sent to a recovery system for removal of the dissolved working fluid. The chosen working fluid is isobutane (IC/sub 4/). The working fluid loop includes a radial inflow turbine with generator, condensers, hot-well reservoir, and a feed pump. A downwell pump was installed in the geothermal well to supply the plant with unflashed brine. (MHR) |
| Publisher: | |
| Country of Publication: | US |
| Language: | English |
| Size/Format: | Medium: ED; Size: Pages: 78 |
| Rights: | |
| Availability: | NTIS, PC A05/MF A01. |
| System Entry Date: | 2009 Sep 24 |
|
|
View Non-Empty Fields Only
|
Top |