|
Feasibility Study-II examined a high-performance Neutrino Factory providing 1 x 10{sup 20} neutrinos per year aimed at a long-baseline detector. The Study was sponsored jointly by BNL and the Neutrino Factory and Muon Collider Collaboration ration (MC) and is based on a 1 MW proton driver operating at 24 GeV, i.e., an upgraded version of the AGS accelerator. Compared with the earlier FNAL-sponsored study (Feasibility Study-I), there is a sixfold improvement in performance. Here we describe details of the implementation of Study-II concepts and discuss their efficacy. Alternative approaches that will be pursued in follow-on R and D activities are also described briefly.
|
| Authors: |
Zisman, Michael S.
|
| Publication Date: | 2001 Aug 15 |
| OSTI Identifier: | 787167 |
| Report Number(s): | LBNL--48814 |
| DOE Contract Number: | AC03-76SF00098 |
| Resource Type: | Conference/Event |
| Resource Relation: | The 3rd International Workshop on Neutrino Factories based on Muon Storage Rings, NuFACT'01, Tsukuba (JP), 05/24/2001--05/30/2001; Other Information: PBD: 15 Aug 2001 |
| Research Org: | Lawrence Berkeley National Lab., CA (US) |
| Sponsoring Org: | USDOE Director, Office of Science. Office of High Energy and Nuclear Physics. Division of High Energy Physics (US) |
| Country of Publication: | United States |
| Language: | English |
| Format: | Size: vp. |
| Other Number(s): | R&D Project: Z3MCMA; TRN: US0110438 |
| Subject: | 43 PARTICLE ACCELERATORS; DESIGN; IMPLEMENTATION; MUONS; NEUTRINOS; PERFORMANCE; PROTONS; STORAGE RINGS; FEASIBILITY STUDIES |
| Related Subject: | NEUTRINO FACTORY MUON STORAGE RING |
| Availability: | INIS; OSTI as DE00787167 |
| Update Date: | 2008 Feb 05 |
Top |