Energy Citations Database
Bookmark and Share

Bibliographic Citation

 
Document This document is available for digitization by request/sponsorship.
For copies of Journal Articles, please contact the Publisher or your local public or university library and refer to the information in the Resource Relation field.
For copies of other documents, please see the Availability, Publisher, Research Organization, Resource Relation and/or Author (affiliation information) fields and/or Document Availability.
Title Brief reconnaissance study for the addition of hydropower for Berry Shoals Pond Dam, Reidville, South Carolina
Creator/Author Gebhard, T.G. Jr.
Publication Date1980 Dec 05
OSTI IdentifierOSTI ID: 5290211; Legacy ID: DE82014708
Report Number(s)DOE/R4/20006-T22
DOE Contract NumberAC44-80R420006
Other Number(s)Other: ON: DE82014708
Resource TypeTechnical Report
Resource RelationOther Information: Portions of document are illegible
Research OrgGebhard (Thomas G.), Austin, TX (USA)
Subject13 HYDRO ENERGY; DAMS; POWER POTENTIAL; RETROFITTING; LOW-HEAD HYDROELECTRIC POWER PLANTS; ECONOMICS; FEASIBILITY STUDIES; SOUTH CAROLINA; ENVIRONMENTAL IMPACTS; INSTITUTIONAL FACTORS; SAFETY; FEDERAL REGION IV; HYDROELECTRIC POWER PLANTS; NORTH AMERICA; POWER PLANTS; USA
Description/AbstractThe feasibility of retrofitting the Berry Shoals Pond Dam near Reidville, SC for power generation was examined. This dam has a developable head of 70 ft., was built in 1900 for generating electric power for a mill, and has not been in service since 1964. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site is possible and would be economical if the old facilities can be rehabilitated. A more in-depth feasibility study is recommended. (LCL)
Country of PublicationUnited States
LanguageEnglish
FormatMedium: X; Size: Pages: 20
AvailabilityNTIS, PC A02/MF A01.
System Entry Date2008 Feb 06

Top