Energy Citations Database
Bookmark and Share (Link will open in a new window)

Recommissioning and first operation of the CWDD injector at Argonne National Laboratory

Description/Abstract

The CWDD injector has been shipped to Argonne National Laboratory, installed, and recommissioned. Commissioning progress, operational status, and future plans are reported. Operational experience at ANL is compared with that obtained at Culham.

Authors: Carwardine, J.A.; Godden, D.J.; Nightingale, M.P.S.; Pile, G.D. [AEA Technology, Abingdon (United Kingdom). Culham Lab.]; Den Hartog, P. [Grumman Aerospace, Bethpage, NY (United States)]; Spence, D. [Argonne National Lab., IL (United States)]
Publication Date:1992 Dec 31
OSTI Identifier:OSTI ID: 10194775; Legacy ID: DE94001342
Report Number(s):ANL/EP/CP--80799; CONF-9204170--4
DOE Contract Number:W-31109-ENG-38
Resource Type:Conference/Event
Resource Relation: Neutral particle beam technical symposium and scientific exchange,Argonne, IL (United States),28 Apr - 1 May 1992; Other Information: PBD: [1992]
Research Org:Argonne National Lab., IL (United States); Grumman Aerospace Corp., Bethpage, NY (United States)
Sponsoring Org:Department of Defense, Washington, DC (United States)
Country of Publication:United States
Language:English
Format: Size: 7 p.
Other Number(s):Other: ON: DE94001342; CNN: Contract DASG60-88-C-0060; TRN: TRN: 93:003855
Specific Type:Technical Report
Subject:43 PARTICLE ACCELERATORS; ION SOURCES; OPERATION; INSTALLATION; LINEAR ACCELERATORS; ION BEAM INJECTION; DEUTERIUM IONS; STEADY-STATE CONDITIONS; ELECTROSTATIC ACCELERATORS
Availability:OSTI as DE94001342; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov
Update Date:2008 Feb 12

Top