skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Proposal for the completion of outstanding work on the installation scheduling and alignment of the SDC central calorimeter

Technical Report ·
DOI:https://doi.org/10.2172/10110258· OSTI ID:10110258

The High Energy Physic Division at Argonne National Laboratory was given the task of developing the procedures, fixtures, and schedules for the final assembly of the barrel and endcap calorimeters for the SDC. The work completed led to some major decision about how and where this assembly work would be done. The primary assembly decision was the feasibility of assembling the major detector components (barrel and endcap sub-assemblies) above ground and lowering them into position in the experimental hall, as opposed to assembling the calorimeter directly in the experimental hall. Due to cost of above ground assembly and schedule changes, the in-hall option was adopted. Although no actual hardware was constructed, many conceptual ideas were formalized and brought to workable solutions as a result of the effort put forth at ANL.

Research Organization:
Argonne National Lab. (ANL), Argonne, IL (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
W-31109-ENG-38
OSTI ID:
10110258
Report Number(s):
ANL-HEP-TR-93-101; ON: DE94004579; TRN: 94:001514
Resource Relation:
Other Information: PBD: 18 Nov 1993
Country of Publication:
United States
Language:
English