| Bibliographic Citation | |
| Full Text | |
|---|---|
| DOI | 10.2172/674963 |
| Title |
Integrating wind turbines into the Orcas Island distribution system loading...
loading...
|
| Creator/Author | Zaininger, H.W. [Zaininger Engineering Co., Roseville, CA (United States)] |
| Publication Date | 1998 Sep 01 |
| OSTI Identifier | OSTI ID: 674963; Legacy ID: DE99000583 |
| Report Number(s) | NREL/SR--500-24792 |
| DOE Contract Number | AC36-83CH10093 |
| DOI | 10.2172/674963 |
| Other Number(s) | Other: ON: DE99000583; TRN: TRN: AHC29820%%428 |
| Resource Type | Technical Report |
| Resource Relation | Other Information: PBD: Sep 1998 |
| Research Org | National Renewable Energy Lab., Golden, CO (United States);Zaininger Engineering Co., Roseville, CA (United States) |
| Sponsoring Org | USDOE Assistant Secretary for Energy Efficiency and Renewable Energy, Washington, DC (United States) |
| Subject | 17 WIND ENERGY; WIND TURBINE ARRAYS; FEASIBILITY STUDIES; PUGET SOUND; ISLANDS; POWER DISTRIBUTION SYSTEMS; CAPACITY; AUGMENTATION |
| Description/Abstract | This research effort consists of two years of wind data collection and analysis to investigate the possibility of strategically locating a megawatt (MW) scale wind farm near the end of an Orcas Power and light Company (OPALCO) 25-kilovolt (kV) distribution circuit to defer the need to upgrade the line to 69 kV. The results of this study support the results of previous work in which another year of wind data and collection was performed. Both this study and the previous study show that adding a MW-scale wind farm at the Mt. Constitution site is a feasible alternative to upgrading the OPALCO 25-kV distribution circuit to 69 kV. |
| Country of Publication | United States |
| Language | English |
| Format | Medium: ED; Size: 71 p. |
| Availability | OSTI as DE99000583 To purchase this media from NTIS, click here |
| System Entry Date | 2009 Dec 11 |
| Document Discussions | |
Top | |

