skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Feasibility study of a 1-MW pulsed spallation source

Conference ·
OSTI ID:93947

A feasibility study of a I-MW pulsed spallation source based on a rapidly cycling proton synchrotron (RCS) has been completed. The facility consists of a 400-MeV H{sup {minus}} linac, a 30-Hz RCS that accelerates the 400-MeV beam to 2 GeV, and two neutron-generating target stations. The design time-averaged current of the accelerator system is 0.5 mA, and is equivalent to 1.04 {times} 10{sup 14} protons per pulse. The linac system consists of an H{sup {minus}} ion source, a 2-MeV RFQ, a 70-MeV DTL and a 330-MeV CCL. Transverse phase space painting to achieve a Kapchinskij-Vladimirskij (K-V) distribution of the injected particles is accomplished by the charge exchange injection and programming of the closed orbit during the injection. The synchrotron lattice uses FODO cells of 9{degrees} phase advance. Dispersion-free straight sections are obtained by using a missing magnet scheme. Synchrotron magnets are powered by a dual-frequency resonance circuit that excites the magnets at a 20-Hz rate and de-excites them at a 60-Hz rate, resulting an effective rate of 30 Hz, and reducing the required rf power by 1/3. Details of the study are presented.

Research Organization:
Argonne National Lab. (ANL), Argonne, IL (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
W-31-109-ENG-38
OSTI ID:
93947
Report Number(s):
ANL/OTD-APS/CP-85086; CONF-950512-140; ON: DE95011824; TRN: 95:018428
Resource Relation:
Conference: 16. Institute of Electrical and Electronic Engineers (IEEE) particle accelerator conference, Dallas, TX (United States), 1-5 May 1995; Other Information: PBD: [1995]
Country of Publication:
United States
Language:
English