skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Injection Options for 12 GeV CEBAF Upgrade

Conference ·
OSTI ID:840296

Jefferson Lab is planning a major upgrade of CEBAF accelerator from 6 to 12 GeV. The injection energy needs to be increased accordingly from 67 MeV to 123 MeV. While the present 100 keV electron gun and beam formation up to 5 MeV would remain unchanged, the accelerating SRF modules in the current injector cannot provide the desired energy increase. Two options for attaining the energy increase have been considered: (1) replacing the present injector SRF modules with new, higher gradient modules, or (2) re-circulating the electron beam through the existing cryomodules to achieve the necessary energy gain in two passes. In this paper we present computer simulation studies for these two options of the injector upgrade and list their advantages and disadvantages.

Research Organization:
Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC05-84ER40150
OSTI ID:
840296
Report Number(s):
JLAB-ACO-05-363; DOE/ER/40150-3408; TRN: US0501959
Resource Relation:
Conference: PAC 05, Knoxville, TN (US), 05/16/2005--05/20/2005; Other Information: PBD: 1 May 2005
Country of Publication:
United States
Language:
English

Similar Records

UPGRADING THE CEBAF INJECTOR WITH A NEW BOOSTER, HIGHER VOLTAGE GUN, AND HIGHER FINAL ENERGY
Conference · Sun Jul 01 00:00:00 EDT 2012 · OSTI ID:840296

Status of CEBAF Upgrades
Conference · Wed Mar 01 00:00:00 EST 2023 · OSTI ID:840296

4 K SRF Operation of the 10 MeV CEBAF Photo-Injector
Conference · Thu Sep 01 00:00:00 EDT 2016 · OSTI ID:840296