SOLENOID MAGNETS FOR THE FRONT END OF A NEUTRINO FACTORY.
This report describes the solenoid magnets in the front end (the section between the pion capture solenoid and the linear acceleration section) of the Level 2 study of a neutrino factory. The magnets described in the report start with the decay channel magnets that starts 18 meter downstream from the start of the pion production target. The magnet string ends with the transition solenoids that match the muon beam from the last cooling cell to the superconducting linear accelerator section. All of the magnets described in this report are solenoids. The field on axis in the solenoidal channel ranges from 1.25 T to just over 5.5 T. This report shows that the magnets in the front end of the neutrino factory are feasible.
- Research Organization:
- Brookhaven National Lab. (BNL), Upton, NY (United States)
- Sponsoring Organization:
- USDOE Office of Energy Research (ER) (US)
- DOE Contract Number:
- AC02-98CH10886
- OSTI ID:
- 806862
- Report Number(s):
- BNL-69557; R&D Project: PO23; KA1501020; TRN: US0301437
- Resource Relation:
- Conference: SNOWMASS 2002 THE FUTURE OF HIGH ENERGY PHYSICS, SNOWMASS, CO (US), 07/01/2002--07/20/2002; Other Information: PBD: 1 Jul 2002
- Country of Publication:
- United States
- Language:
- English
Similar Records
Numerical study of a magnetically insulated front-end channel for a neutrino factory
Magnet Misalignment Studies for the Front-end of the Neutrino Factory