Title: Status Report and Future Plans for the PEP-II B Factory

Technical Report ·
DOI:https://doi.org/10.2172/784907· OSTI ID:784907

The PEP-II B Factory at SLAC has been in operation with the BABAR detector since the summer of 1999. The peak currents and luminosity steadily increased through the end of the 2000 run on October 31. By that time, 0.75 A of electrons (the design current) routinely collided with 1.4 A of positrons in 657 bunches, to give a peak luminosity of 2.6 x 10{sup 33} cm{sup -2} s{sup -1}. We delivered an integrated luminosity of up to 184 pb{sup -1} per day and 1033 per week; BABAR logged a total of 25 fb{sup -1}. Three days of machine development at the end of the run raised the peak luminosity to 3.29 x 10{sup 33}, exceeding the design goal of 3.0. BABAR then logged data for an hour, starting with a peak of 3.20. Next, we achieved the design value for positron current, 2.14 A, operating without collisions. The major limitation has been growth in the size of the positron beam in the low-energy ring (LER) due to electron clouds and multipacting. Since the arcs benefit from antechambers and a TiN coating with low secondary emission, our efforts have concentrated on the straights, where we added solenoid windings. Each straight wound allowed higher LER current without blow-up, and a consequent increase in luminosity. Measurements of the bunch-by-bunch luminosity showed that the effect becomes significant by about the tenth bunch in a train, but clears after a short gap. Careful control of the fill pattern has thus been essential in raising luminosity. For the 2001 run, which began in February, we added a third LER RF station, to collide with more LER current and more bunches, and also tried reducing {beta}*{sub x} from 50 to 35 cm, with the goal of reaching a luminosity of 5 x 10{sup 33} by year's end. In 2003, we plan to add a fourth LER and sixth HER RF station to reach 1 x 10{sup 34}.

Research Organization:
SLAC National Accelerator Lab., Menlo Park, CA (United States)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC03-76SF00515
OSTI ID:
784907
Report Number(s):
SLAC-PUB-8815; TRN: US0108680
Resource Relation:
Other Information: PBD: 12 Apr 2001
Country of Publication:
United States
Language:
English

Similar Records

Observation of Beam Size Flip-Flop in PEP-II
Technical Report · Tue Jun 11 00:00:00 EDT 2002 · OSTI ID:784907

Increasing the Number of Bunches in PEP-II
Technical Report · Mon Jun 24 00:00:00 EDT 2002 · OSTI ID:784907

PEP-II Operations Report
Conference · Wed Nov 01 00:00:00 EST 2000 · OSTI ID:784907