Engineering tasl plan for the development, fabrication and installation of rotary mode core sample truck bellows
The Rotary Mode Core Sampling Trucks (RMSCTs) currently use a multi-sectioned bellows between the grapple box and the quill rod to compensate for drill head motion and to provide a path for purge gas. The current bellows, which is detailed on drawing H-2-690059, is expensive to procure, has a lengthy procurement cycle, and is prone to failure. Therefore, a task has been identified to design, fabricate, and install a replacement bellows. This Engineering Task Plan (ETP) is the management plan document for accomplishing the identified tasks. Any changes in scope of the ETP shall require formal direction by the Characterization Engineering manager. This document shall also be considered the work planning document for developmental control per Development Control Requirements (HNF 1999a). This Engineering Task Plan (ETP) is the management plan document for accomplishing the design, fabrication, and installation of a replacement bellows assembly for the Rotary Mode Core Sampling Trucks 3 and 4 (RMCST).
- Research Organization:
- Hanford Site (HNF), Richland, WA (United States)
- Sponsoring Organization:
- US DOE Office of Environmental Management (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 782391
- Report Number(s):
- HNF-3567-REV0; TRN: US0204675
- Resource Relation:
- Other Information: PBD: 24 Jun 1999
- Country of Publication:
- United States
- Language:
- English
Similar Records
Engineering task plan for the development, fabrication and installation of rotary mode core sample truck grapple hoist box level wind system
Engineering Task Plan for the Development of Footclamp