Structural analysis of the Heel Jet secondary catch mechanism
Technical Report
·
OSTI ID:71576
Studies of the Heel Jet Pump lifting bail weld indicate that the weld process and/or weld material used may be incompatible with the base metal. For this reason, a backup design for hoist of the Heel Jet Pump is necessary. By using a 0.0508 m (2 in.) and 0.0762 m (3 in.) jumper connector in conjunction with the existing lifting bail the Heel Jet Pump can be safely hoisted.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 71576
- Report Number(s):
- WHC-SD-W320-DA-007; ON: DE95010573; TRN: 95:015206
- Resource Relation:
- Other Information: PBD: 17 Apr 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Project W-320 Heel Jet Secondary Catch Mechanism lateral load test
Project W320 heel jet secondary catch mechanism lateral load test - test report
Robotics development for the accelerator production of tritium
Technical Report
·
Thu Sep 01 00:00:00 EDT 1994
·
OSTI ID:71576
Project W320 heel jet secondary catch mechanism lateral load test - test report
Technical Report
·
Thu Dec 01 00:00:00 EST 1994
·
OSTI ID:71576
Robotics development for the accelerator production of tritium
Conference
·
Tue Jan 18 00:00:00 EST 2000
·
OSTI ID:71576