skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: NOx control subsystem test plan: LEBS Phase II

Technical Report ·
DOI:https://doi.org/10.2172/70746· OSTI ID:70746

It is planned that NO{sub x} control subsystem testing in support of Phase II of the Low-Emissions Boiler Systems (LEBS) Project occur in ABB Power Plant Laboratories` (PPL) pilot scale Boiler Simulation Facility (BSF). This work will be performed to provide necessary design and operational information for inclusion of an optimized NO, control subsystem in the Proof-of-Concept Test Facility (POCTF) and Commercial Generating Unit (CGU) designs. The BSF is a 50 to 90x10{sup 6} BTU/hr (15 to 26 MWt) coal, oil or natural gas fired tangential furnace designed to replicate the residence time/temperature history of a utility scale tangentially fired boiler. All major aspects of a typical utility boiler are duplicated in the BSF including the lower furnace, the ash hopper, multiple burner elevations, the arch section, superheater/reheater panels, and the convective heat transfer surfaces. The furnace walls and heat transfer surfaces are cooled by a surrounding water jacket. Steam generated is vented off at atmospheric pressure so that a constant sink temperature of 100{degrees}C (212{degrees}C) is maintained. The lower furnace water walls are selectively refractory lined to maintain an appropriate furnace gas temperature history. Refractory is required because the sink temperature (100{degrees}C) is cooler than that of a typical, utility boiler, and the surface-to-volume ratio of the BSF is greater than that of a utility boiler due to scale effects. For the subject testing, the BSF will be configured as a coal fired boiler. Design and planning activities associated with the construction of the NO{sub x} control subsystem test unit will continue through June, 1995. Additionally, the schedule for specification of certain low NO{sub x} firing system components was set to allow for precursor, internal and LEBS development activities to occur and subsequently provide necessary design parameters.

Research Organization:
Combustion Engineering, Inc., Windsor, CT (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC22-92PC92159
OSTI ID:
70746
Report Number(s):
DOE/PC/92159-T11; ON: DE95012419; TRN: 95:004801
Resource Relation:
Other Information: PBD: 16 Mar 1995
Country of Publication:
United States
Language:
English