skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Development of a telerobotic system for handling contaminated process equipment

Conference ·
OSTI ID:6969471

E. I. du Pont de Nemours and Company is evaluating a unique eight-degree-of-freedom Telerobot manipulator to perform size-reduction and material handling operations on contaminated process equipment at the Savannah River Plant (SRP). The Telerobot will be installed in the proposed Transuranic (TRU) Waste Processing Facility, which is scheduled to be operational by 1990. A full-scale prototype Telerobot, manufactured by GCA Corporation, St. Paul, MN is being tested with other process equipment in the Components Test Facility at the Savannah River Laboratory (SRL). All telerobotic operations required in the TRU Waste Facility such as crate unpacking, equipment dismantling, material size-reduction, and selected maintenance operations are being tested. This paper discusses the major mechanical and control features of the Telerobot system. Several system enhancements were added by SRL, including a new quick-hand-change coupling and expanded software control functions. The new software enables a system operator to perform both teleoperated and automatic tasks through several operating modes. These enhancements, as well as future mechanical, control system, and software features, are reviewed.

Research Organization:
Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Lab.
DOE Contract Number:
AC09-76SR00001
OSTI ID:
6969471
Report Number(s):
DP-MS-86-185; CONF-870301-13; ON: DE87004186
Resource Relation:
Conference: International topical meeting on remote systems and robotics in hostile environments, Pasco, WA, USA, 29 Mar 1987; Other Information: Portions of this document are illegible in microfiche products
Country of Publication:
United States
Language:
English