Title: Fiscal Year 1998 Well Installation, Plugging and Abandonment, and Redevelopment summary report Y-12 Plant, Oak Ridge, Tennessee

Technical Report ·
DOI:https://doi.org/10.2172/6891· OSTI ID:6891

This report summarizes the well installation, plugging and abandonment, and redevelopment activities conducted during the federal fiscal year (FY) 1998 at the Y-12 Plant, Oak Ridge, Tennessee. Five new groundwater monitoring wells were installed at the Y-12 Plant under the FY 1998 drilling program. Two of the wells are located in west Bear Creek Valley, one is in the eastern Y-12 Plant area near Lake Reality, and two are located near the Oil Landfarm Waste Management Area, which were installed by Bechtel Jacobs Company LLC (Bechtel Jacobs) as part of a site characterization activity for the Oak Ridge Reservation (ORR) Disposal Cell. Also, two existing wells were upgraded and nine temporary piezometers were installed to characterize hydrogeologic conditions at the Disposal Cell site. In addition, 40 temporary piezometers were installed in the Boneyard/Bumyard area of Bear Creek Valley by Bechtel Jacobs as part of the accelerated remedial actions conducted by the Environmental Restoration Program. Ten monitoring wells at the Y-12 Plant were decommissioned in FY 1998. Two existing monitoring wells were redeveloped during FY 1998 (of these, GW-732 was redeveloped tsvice). All well installation and development (including redevelopment) was conducted following industry-standard methods and approved procedures from the Environmental Surveillance Procedures Quality Control Program (Energy Systems 1988); the Resource Conservation and Recovery Act (RCRA) Groundwater Monitoring Technical Enforcement Guidance Document (EPA 1992); and the Monitoring Well Installation Plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee (Energy Systems 1997a). Well installation and development of the non-Y-12 Plant GWPP oversight installation projects were conducted using procedures/guidance defined in the following documents: Work Plan for Support to Upper East Fork Poplar Creek East End Volatile Organic Compound Plumes Well Installation Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (SAIC 1998a); Sampling and Analysis Plan for the Oil Landfarm Soils Containment Pad (SAIC 1998b); and Work Plan for Phase III Predesign Site Characterization, Environmental Waste Management Facility, Oak Ridge, Tennessee (Jacobs 1998a). Plugging and abandonment of all wells for which such action was taken were done in accordance with the Monitoring Well Plugging and Abandonment Plan, Y-12 Plant, Oak Ridge, Tennessee (Revised) (Energy Systems 1997b). Health and safety monitoring and field screening of drilling returns and development waters were conducted in accordance with the Health and Safety Plan for Well Installation and Plugging and Abandonment Activities, Y-12 Plant, Oak Ridge, Tennessee (SAIC 1992), Sampling and Anaiysis Plan for the Oil Landfarm Soils Containment Pad (SAIC 1998b), Work Plan for Phase III Predesign Site Characterization, Environmental Waste Management Facility, Oak Ridge, Tennessee (Jacobs 1998a), and other applicable MK Ferguson health and safety documents (Project Hazard Analysis, Site-specific Activity Hazard Analysis).

Research Organization:
Oak Ridge Y-12 Plant (Y-12), Oak Ridge, TN
Sponsoring Organization:
USDOE Office of Defense Programs (DP)
DOE Contract Number:
AC05-84OR21400
OSTI ID:
6891
Report Number(s):
Y/SUB/98-EBF49 V1; ON: DE00006891
Country of Publication:
United States
Language:
English