Preconstruction of the Honey Lake Hybrid Power Plant
The work undertaken under this Contract is the prosecution of the preconstruction activities, including preliminary engineering design, well field development, completion of environmental review and prosecution of permits, and the economic and financial analysis of the facility. The proposed power plant is located in northeastern California in Lassen County, approximately 25 miles east of the town of Susanville. The power plant will use a combination of wood residue and geothermal fluids for power generation. The plant, when fully constructed, will generate a combined net output of approximately 33 megawatts which will be sold to Pacific Gas and Electric Company (PG E) under existing long-term power sales contracts. Transfer of electricity to the PG E grid will require construction of a 22-mile transmission line from the power plant to Susanville. 11 refs., 12 figs., 7 tabs.
- Research Organization:
- Geoproducts Corp., Oakland, CA (USA)
- Sponsoring Organization:
- USDOE; USDOE, Washington, DC (USA)
- DOE Contract Number:
- AC07-84ID12477
- OSTI ID:
- 5783024
- Report Number(s):
- DOE/ID/12477-T1; ON: DE91014522
- Country of Publication:
- United States
- Language:
- English
Similar Records
Honey Lake Power Facility under construction
Honey Lake Hybrid Power Plant Project. Volume 1. Executive summary
Related Subjects
GEOTHERMAL POWER PLANTS
CONSTRUCTION
CALIFORNIA
ECONOMIC ANALYSIS
ELECTRIC POWER
ENVIRONMENTAL IMPACTS
FINANCING
PERMITS
POWER GENERATION
POWER TRANSMISSION LINES
PROGRESS REPORT
WOOD FUELS
ADMINISTRATIVE PROCEDURES
DEVELOPED COUNTRIES
DOCUMENT TYPES
ECONOMICS
ENERGY SOURCES
FEDERAL REGION IX
FUELS
NORTH AMERICA
POWER
POWER PLANTS
THERMAL POWER PLANTS
USA
Geothermal Legacy
150800* - Geothermal Power Plants
150500 - Geothermal Energy- Economics
Industrial
& Business Aspects
150400 - Geothermal Energy- Legislation & Regulations
150600 - Geothermal Energy- Environmental Aspects