skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Limited energy study of high temperature and chilled water distribution systems at Fort Stewart and Hunter Army Airfield, Georgia. Volume ES, executive summary. Final report

Technical Report ·
OSTI ID:564830

The primary purpose of this contract is to conduct a detailed study that will determine the location and quantity of losses from the High Temperature Water (HTW) distribution system at Fort Stewart. A copy of the Scope of Work for this project is contained in the Appendix. This study includes a comprehensive field investigation of the energy plants, distribution system piping and end-use systems, identification of Energy Conservation Opportunities (ECOs), energy savings calculations and economic analysis of the ECOs. This project also includes interviews with operation and maintenance personnel, review of records and recommendations on whether further study is required on the chilled water distribution system at Fort Stewart and the high temperature water and chilled water distribution systems at Hunter Army Airfield. The results of the analysis and the recommendations are contained in the Records Analysis and Site Survey Plan which was submitted on August 28, 1995.

Research Organization:
Reynolds, Smith and Hills, Jacksonville, FL (United States)
OSTI ID:
564830
Report Number(s):
AD-A-330733/7/XAB; CNN: Contract DACA01-94-D-0038; TRN: 73560395
Resource Relation:
Other Information: PBD: 6 Sep 1996
Country of Publication:
United States
Language:
English