Cormorant; Development of a complex field
- Esso E and P U.K. (GB)
The development plan of Cormorant oil field exemplifies changes required as the nature of a large, complex field becomes better known. The number and locations of wells and the completion method have changed as the structural, stratigraphic, and diagnetic natures of the field became better known. A better understanding of a key development constraint-and drilling reach-has allowed changes to the development plan at significant cost savings. Close surveillance of geological results and field performance has been necessary to allow almost continuous updating. This paper discusses studies and evaluations undertaking by Eso E and P U.K. to evaluate such changes for each of the field's four fault blocks. These studies complemented work done by the operator, Shell U.K. E and P.
- OSTI ID:
- 5519518
- Journal Information:
- SPE Formation Evaluation (Society of Petroleum Engineers); (United States), Vol. 6:4; ISSN 0885-923X
- Country of Publication:
- United States
- Language:
- English
Similar Records
The use of detailed reservoir description and simulation studies in investigating completion strategies, cormorant, UK North Sea
Investigating completion strategies; Cormorant Field, U. K. North Sea
Related Subjects
29 ENERGY PLANNING
POLICY AND ECONOMY
GEOLOGIC SURVEYS
DATA ANALYSIS
PLANNING
OIL FIELDS
PERFORMANCE TESTING
STRATIGRAPHY
OIL WELLS
GEOLOGIC FAULTS
PETROLEUM GEOLOGY
WELL COMPLETION
WELL DRILLING
DRILLING
GEOLOGIC DEPOSITS
GEOLOGIC FRACTURES
GEOLOGIC STRUCTURES
GEOLOGY
MINERAL RESOURCES
PETROLEUM DEPOSITS
RESOURCES
SURVEYS
TESTING
WELLS
020200* - Petroleum- Reserves
Geology
& Exploration
294002 - Energy Planning & Policy- Petroleum