Validation of digital simulation of DC links - Part II
This paper establishes the validity of digital simulation of transients in HVDC-ac power systems. For the digital simulation BPA's EMTP was used. Manitoba Hydro's Nelson River HVDC system comprising two HVDC bipoles, Bipole 1: 1668 MW and Bipole 2: 1000 MW was used for digital simulation test cases. The simulation results were compared with the field tests conducted by Manitoba Hydro. The paper presents a new technique of initialization for digital computer simulation. Direct comparison of the computed results with field tests establishes clearly the validity of simulation. Comparison of the results of this paper with those of Reference (1), shows that both EMTP and EMTDC programs can be used for accurate digital simulation. EMTDC is a new program and it is found to be very efficient and economical for digital simulation.
- Research Organization:
- Manitoba HVDC Research Center, Winnipeg, Manitoba
- OSTI ID:
- 5125345
- Journal Information:
- IEEE Trans. Power Appar. Syst.; (United States), Vol. PAS-104:9
- Country of Publication:
- United States
- Language:
- English
Similar Records
Development and validation of detailed controls models of the Nelson River Bipole 1 HVDC system
A reliability cost-benefit analysis for HVDC transmission expansion planning
Related Subjects
COMPUTERIZED SIMULATION
INFORMATION VALIDATION
HVDC SYSTEMS
COMPUTER CODES
E CODES
FIELD TESTS
MANITOBA
MATHEMATICAL MODELS
POWER RANGE 100-1000 MW
TRANSIENTS
CANADA
DC SYSTEMS
ENERGY SYSTEMS
NORTH AMERICA
POWER SYSTEMS
SIMULATION
TESTING
VALIDATION
200302* - Power Transmission & Distribution- DC Systems- (1989-)