Title: LIMB Demonstration Project Extension: Quarterly report No. 2 for the period August, September, October 1987

Technical Report ·
OSTI ID:5089270

Phase 1 activities emphasized Coolside sorbent evaluation, detailed engineering of the flue gas humidification chamber and bypass flues, and Coolside waste characterization. Consol completed evaluation of twelve different commercially available sorbents through a chemical and physical characterization effort and a pilot process testing effort. The Coolside demonstration sorbent will be chosen from the superior desulfurization performers based on quoted delivery prices. For Phase IIA---Site Preparation and Long-Lead Time Item Procurement, asbestos removal and demolition of the retired precipitator is complete. Under Phase IIB---Coolside and LIMB Construction, Start-Up and Shakedown, the Edgewater extended maintenance outage began on September 26, 1987. It will continue until mid-January 1988. (PSB)

Research Organization:
Babcock and Wilcox Co., Barberton, OH (USA). Contract Research Div.
DOE Contract Number:
FC22-87PC79798
OSTI ID:
5089270
Report Number(s):
DOE/PC/79798-T3; ON: DE88008332
Country of Publication:
United States
Language:
English