skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Using coiled tubing in HP/HT corrosive gas wells

Journal Article · · JPT, Journal of Petroleum Technology
OSTI ID:504921

High-yield-strength (100,000 psi) coiled tubing (CT) material has allowed for CT intervention in Mobile Bay Norphlet completions. These wells are approximately 22,000-ft-vertical-depth, high-pressure, hydrogen sulfide (H{sub 2}S) gas wells. Operations performed on the Norphlet wells include a scale cleanout to approximately 22,000 ft, a hydrochloric acid (HCl) job at 415 F, and buildup removal from a safety valve. The scale cleanout was performed first with a spiral wash tool. The well was killed with 10-lbm/gal sodium bromide (NaBr) brine; the same brine was used for cleanout fluid. Cost savings of 60% were realized. A HCl matrix acid job at 415 F was performed next, followed by a scale cleanout across the downhole safety valve. The safety valve was cleared of debris in 1 operational day. Estimated cost of the CT operation was 5 to 10% less than that of a rig workover. The 100,000-psi-yield Ct material used for the Mobile Bay operations does not comply with the (NACE) Standard MR-0175. But on the basis of extensive laboratory testing by the CT manufacturer, the decision was made that the material would pass a modified test performed with decreased H{sub 2}S levels. A maximum level of 400 ppm H{sub 2}S was determined as the safe working limit. Because the maximum H{sub 2}S content in the wells described later was 120 ppm, the risk of sulfide-stress cracking (SSC) was considered acceptably low. Elevated bottomhole temperatures (BHT`s) increase the corrosion rate of metals exposed to corrosives. Extensive laboratory testing of corrosion inhibitors allowed for design of a matrix-acidizing treatment to remove near-wellbore damage caused by lost zinc bromide (ZnBr) completion brine.

OSTI ID:
504921
Journal Information:
JPT, Journal of Petroleum Technology, Vol. 49, Issue 6; Other Information: PBD: Jun 1997
Country of Publication:
United States
Language:
English

Similar Records

Completion practices in deep sour Tuscaloosa wells
Journal Article · Sun Jan 01 00:00:00 EST 1984 · J. Pet. Technol.; (United States) · OSTI ID:504921

Successful removal of zinc sulfide scale restriction from a hot, deep, sour gas well
Journal Article · Tue Jul 01 00:00:00 EDT 1997 · Petroleum Engineer International · OSTI ID:504921

Coiled tubing; Operations and services
Journal Article · Wed Jul 01 00:00:00 EDT 1992 · World Oil; (United States) · OSTI ID:504921