Interim safety equipment list for 241-C-106 waste retrieval, project W-320
The purpose of this supporting document is to provide safety classifications for systems, structures, and components of the Tank 241-C-106 Waste Retrieval Sluicing System (WRSS) and to document the methodology used to develop these safety classifications. The WRSS requires two transfer lines, one to carry sluiced waste slurry to tank 241-AY-102 and the other to return supernatant to tank 241-C-106; pumps in each tank; sluicers to direct the supernatant stream inside tank 241-C-106; a slurry distributor in tank 241-AY-102; heating, ventilation, and air conditioning for tank 241-C-106; and instrumentation and control devices.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 469648
- Report Number(s):
- WHC-SD-WM-SEL-033-Rev.2; ON: DE97052331; TRN: 97:010363
- Resource Relation:
- Other Information: PBD: 25 Jan 1996
- Country of Publication:
- United States
- Language:
- English
Similar Records
Safety equipment list for 241-C-106 waste retrieval, Project W-320: Revision 1
Nonradioactive air emissions notice of construction, Project W-320, 241-C-106 tank sluicing
Calculation note: project W-320 primary ventilation air flowrequirements for mitigation of steady state flammable gasconcentrations in the headspaces of tanks 241-C-106 and 241-AY-102
Technical Report
·
Tue Nov 15 00:00:00 EST 1994
·
OSTI ID:469648
Nonradioactive air emissions notice of construction, Project W-320, 241-C-106 tank sluicing
Technical Report
·
Wed Jan 28 00:00:00 EST 1998
·
OSTI ID:469648
Calculation note: project W-320 primary ventilation air flowrequirements for mitigation of steady state flammable gasconcentrations in the headspaces of tanks 241-C-106 and 241-AY-102
Technical Report
·
Wed Jun 04 00:00:00 EDT 1997
·
OSTI ID:469648