Title: Summary of inspection findings of licensee inservice testing programs at United States commercial nuclear power plants

Conference ·
OSTI ID:402001

Periodic inspections of pump and valve inservice testing (IST) programs in United States commercial nuclear power plants are performed by Nuclear Regulatory Commission (NRC) Regional Inspectors to verify licensee regulatory compliance and licensee commitments. IST inspections are conducted using NRC Inspection Procedure 73756, {open_quotes}Inservice Testing of Pumps and Valves{close_quotes} (IP 73756), which was updated on July 27, 1995. A large number of IST inspections have also been conducted using Temporary Instruction 2515/114, {open_quotes}Inspection Requirements for Generic Letter 89-04, Acceptable Inservice Testing Programs{close_quotes} (TI-2515/114), which was issued January 15, 1992. A majority of U.S. commercial nuclear power plants have had an IST inspection to either IP 73756 or TI 2515/114. This paper is intended to summarize the significant and recurring findings from a number of these inspections since January of 1990.

Research Organization:
American Society of Mechanical Engineers (ASME), New York, NY (United States)
OSTI ID:
402001
Report Number(s):
NUREG/CP-0152; CONF-9607103-; ON: TI96013645; TRN: 96:005268-0035
Resource Relation:
Conference: 4. NRC/ASME symposium on valve and pump testing in nuclear power plants, Washington, DC (United States), 15-18 Jul 1996; Other Information: PBD: [1996]; Related Information: Is Part Of Proceedings of the 4th NRC/ASME symposium on valve and pump testing; PB: 719 p.
Country of Publication:
United States