324 Facility B-Cell quality process plan
B-Cell is currently being cleaned out (i.e., removal of equipment, fixtures and residual radioactive materials) and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/99. The following sections describe the major activities that remain for completion of the TPA milestone. This includes: (1) Size Reduce Tank 119 and Miscellaneous Equipment. This activity is the restart of hotwork in B-Cell to size reduce the remainder of Tank 119 and other miscellaneous pieces of equipment into sizes that can be loaded into a grout container. This activity also includes the process of preparing the containers for shipment from the cell. The specific activities and procedures used are detailed in a table. (2) Load and Ship Low-Level Waste. This activity covers the process of taking a grouted LLW container from B-Cell and loading it into the cask in the REC airlock and Cask Handling Area (CHA) for shipment to the LLBG. The detailed activities and procedures for this part of cell cleanout are included in second table.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 353311
- Report Number(s):
- HNF-2286-Rev.2; ON: DE99050714; BR: EX7050000; TRN: AHC29923%%143
- Resource Relation:
- Other Information: PBD: 10 Jun 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
324 Facility B-Cell quality process plan
324 Building life cycle dose estimates for planned work