Project W-320, 241-C-106 sluicing: Civil/structural calculations. Volume 3
This supporting document has been prepared to make the FDNW civil/structural calculations for Project W-320 readily retrievable. The Equipment Removal System (ERS) has been identified by WHC as not having any safety class 1 items present in the tank pits during equipment removal activities, Documentation of this finding is provided in Letter of Instruction 3/1 Analysis Requirements for Project W-320 Equipment Removal System (REF: LOI KGS-94-013). Based on this specific direction from WHC, 3/1 analysis for any component of the Project W-320 ERS is required. No further documentation of non-safety impacting safety items is required per DOE-RL Audit finding No.90-02, and filing of this memorandum in the W-320 project files satisfies the intent of the referenced DOE observation.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 345001
- Report Number(s):
- HNF-2463; ON: DE99050857; BR: EW3130010; TRN: 99:004879
- Resource Relation:
- Other Information: PBD: 24 Jul 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Project W-320, 241-C-106 sluicing: Civil/structural calculations. Volume 1
Project W-320, 241-C-106 sluicing: Civil/structural calculations. Volume 8