skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Results from the NRC AP600 testing program at the Oregon State University APEX facility

Technical Report ·
DOI:https://doi.org/10.2172/269713· OSTI ID:269713
 [1];  [2];  [3]
  1. Oregon State Univ., Corvallis, OR (United States)
  2. Nuclear regulatory Systems, Washington, DC (United States)
  3. Univ. of Maryland, College Park, MD (United States)

The Department of Nuclear Engineering at Oregon State University (OSU) is performing a series of confirmatory tests for the U.S. Nuclear Regulatory Commission. These tests are being conducted in the Advanced Plant Experiment (APEX) facility which is a 1/4 length scale and 1/192 volume scale integral system simulation of the Westinghouse Advanced Passive 600 MWe (AP600) plant. The purpose of the testing program is to examine AP600 passive safety system performance, particularly during long term cooling. Thus far, OSU has successfully performed ten integral system tests for the NRC. This paper presents a description of the APEX facility and summarizes the important results of the NRC test program at OSU.

Research Organization:
US Nuclear Regulatory Commission (NRC), Washington, DC (United States). Office of Nuclear Regulatory Research; Brookhaven National Lab. (BNL), Upton, NY (United States)
OSTI ID:
269713
Report Number(s):
NUREG/CP-0149-Vol.1; CONF-9510156-Vol.1; ON: TI96009154; TRN: 96:016819
Resource Relation:
Conference: 23. water reactor safety information meeting, Bethesda, MD (United States), 23-25 Oct 1995; Other Information: PBD: Mar 1996; Related Information: Is Part Of Twenty-third water reactor safety information meeting: Volume 1, plenary session, high burnup fuel behavior, thermal hydraulic research. Proceedings; Monteleone, S. [comp.] [Brookhaven National Lab., Upton, NY (United States)]; PB: 265 p.
Country of Publication:
United States
Language:
English