skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Commissioning the FELI linac and UV-FEL facility

Conference ·
OSTI ID:238869
; ;  [1]
  1. Free Electron Laser Research Institute, Osaka (Japan); and others

The FELI 165-MeV linac and UV-FEL facility are in the commissioning, stage. A thermionic triode gun of the 6-MeV injector emits 500-ps pulses of 2.3A at 22.3125MHz. These pulses are compressed to 60AX 7ps by a 714-MHz prebuncher and a 2856-MHz buncher and seven ETL type accelerating waveguides with a length of 2.93m. The length of the linac including bending sections of two S-type BT systems for two undulators used for IR-FEL oscillations is 46m. The buncher and these accelerating waveguides are powered by two klystrons (E3729, 2856MHz, total 48MW, 24-{mu}s flat top long pulses). The flatness of our klystron modulator pulses is 0.067% at 24-{mu}s duration. An rf-ageing for new four accelerating waveguides will be started in May. An S-type BT line for 165-MeV beam from the linac will be installed in the end of April. A 2.68-m undulator ({lambda}u=4.0cm, N=67, Kmax gap length {ge}16mm) and an optical cavity (Lc=6.72m) will be installed early in July. The beam conditionings for UV-FEL experiments will be started in July.

Research Organization:
Brookhaven National Lab. (BNL), Upton, NY (United States)
OSTI ID:
238869
Report Number(s):
BNL-61982-Absts.; CONF-9508156-Absts.; ON: DE96002729; TRN: 96:013359
Resource Relation:
Conference: 17. international free electron laser conference, New York, NY (United States), 21-25 Aug 1995; Other Information: PBD: [1995]; Related Information: Is Part Of 17th international free electron laser conference and 2nd international FEL users` workshop. Program and abstracts; PB: 300 p.
Country of Publication:
United States
Language:
English