Title: Substation automation feasibility study. Final report. Export trade information

Technical Report ·
OSTI ID:236955

This study, conducted by Macro Corporation, was funded by the U.S. Trade and Development Agency, on behalf of the Polish Power Grid Company. The report shows the results of a feasibility study for the implementation of substation automation on the company`s high-voltage transmission network. The report is aimed at providing a technical-economic assessment of modernizing the monitoring, protection, and control systems in the major transmission substations. The report is divided into the following sections: (1) Introduction; (2) Existing Situation And Assessment Of Operational Needs; (3) Functional Requirements; (4) Implementation Options and Costs; (5) Guidelines for Staged Implementation; (6) Conclusions and Recommendations.

Research Organization:
Macro Corp., Fort Washington, PA (United States)
OSTI ID:
236955
Report Number(s):
PB-96-166012/XAB; TRN: 61211644
Resource Relation:
Other Information: DN: This document was provided to NTIS by the U.S. Trade and Development Agency, Rosslyn, VA; PBD: 1 Jul 1995
Country of Publication:
United States
Language:
English