Title: Data Quality Objectives for WTP Feed Acceptance Criteria - 12043

Conference ·
OSTI ID:22293380
; ; ; ; ; ;  [1]; ; ; ;  [2]
  1. Hanford Tank Waste Treatment and Immobilization Plant (United States)
  2. Hanford Tank Operations Contractor - Washington River Protection Solutions, Richland, WA 99354 (United States)

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is under construction for the U.S. Department of Energy by Bechtel National, Inc. and subcontractor URS Corporation (contract no. DE-AC27-01RV14136). The plant when completed will be the world's largest nuclear waste treatment facility. Bechtel and URS are tasked with designing, constructing, commissioning, and transitioning the plant to the long term operating contractor to process the legacy wastes that are stored in underground tanks (from nuclear weapons production between the 1940's and the 1980's). Approximately 56 million gallons of radioactive waste is currently stored in these tanks at the Hanford Site in southeastern Washington. There are three major WTP facilities being constructed for processing the tank waste feed. The Pretreatment (PT) facility receives feed where it is separated into a low activity waste (LAW) fraction and a high level waste (HLW) fraction. These fractions are transferred to the appropriate (HLW or LAW) facility, combined with glass former material, and sent to high temperature melters for formation of the glass product. In addition to PT, HLW and LAW, other facilities in WTP include the Laboratory (LAB) for analytical services and the Balance of Facilities (BOF) for plant maintenance, support and utility services. The transfer of staged feed from the waste storage tanks and acceptance in WTP receipt vessels require data for waste acceptance criteria (WAC) parameters from analysis of feed samples. The Data Quality Objectives (DQO) development was a joint team effort between WTP and Tank Operations Contractor (TOC) representatives. The focus of this DQO effort was to review WAC parameters and develop data quality requirements, the results of which will determine whether or not the staged feed can be transferred from the TOC to WTP receipt vessels. The approach involved systematic planning for data collection consistent with EPA guidance for the seven-step DQO process. Data quality requirements for sample collection and analysis of all WAC parameters were specified during the DQO process. There were eighteen key parameters identified with action limits to ensure the feed transfer and receipt would not exceed plant design, safety, permitting, and processing requirements. The remaining WAC parameters were grouped in the category for obtaining data according to WTP contract specifications, regulatory reporting requirements, and for developing the feed campaign processing sequence. (authors)

Research Organization:
WM Symposia, 1628 E. Southern Avenue, Suite 9-332, Tempe, AZ 85282 (United States)
OSTI ID:
22293380
Report Number(s):
INIS-US-14-WM-12043; TRN: US14V1033114904
Resource Relation:
Conference: WM2012: Waste Management 2012 conference on improving the future in waste management, Phoenix, AZ (United States), 26 Feb - 1 Mar 2012; Other Information: Country of input: France; 7 refs.